0000353020-16-000091.txt : 20160505 0000353020-16-000091.hdr.sgml : 20160505 20160505164055 ACCESSION NUMBER: 0000353020-16-000091 CONFORMED SUBMISSION TYPE: 8-K PUBLIC DOCUMENT COUNT: 4 CONFORMED PERIOD OF REPORT: 20160502 ITEM INFORMATION: Results of Operations and Financial Condition ITEM INFORMATION: Financial Statements and Exhibits FILED AS OF DATE: 20160505 DATE AS OF CHANGE: 20160505 FILER: COMPANY DATA: COMPANY CONFORMED NAME: Aegion Corp CENTRAL INDEX KEY: 0000353020 STANDARD INDUSTRIAL CLASSIFICATION: WATER, SEWER, PIPELINE, COMM AND POWER LINE CONSTRUCTION [1623] IRS NUMBER: 133032158 STATE OF INCORPORATION: DE FISCAL YEAR END: 1231 FILING VALUES: FORM TYPE: 8-K SEC ACT: 1934 Act SEC FILE NUMBER: 001-35328 FILM NUMBER: 161624497 BUSINESS ADDRESS: STREET 1: 17988 EDISON AVENUE CITY: CHESTERFIELD STATE: MO ZIP: 63005 BUSINESS PHONE: 6365308000 MAIL ADDRESS: STREET 1: 17988 EDISON AVENUE CITY: CHESTERFIELD STATE: MO ZIP: 63005 FORMER COMPANY: FORMER CONFORMED NAME: INSITUFORM TECHNOLOGIES INC DATE OF NAME CHANGE: 19930617 FORMER COMPANY: FORMER CONFORMED NAME: INSITUFORM OF NORTH AMERICA INC/TN/ DATE OF NAME CHANGE: 19930617 FORMER COMPANY: FORMER CONFORMED NAME: INSITUFORM OF NORTH AMERICA INC DATE OF NAME CHANGE: 19921217 8-K 1 a8k-2016q1earningsrelease.htm 8-K (2016 Q1 EARNINGS RELEASE AND TRANSCRIPT) 8-K


UNITED STATES
SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549
________________

FORM 8-K

CURRENT REPORT

Pursuant to Section 13 or 15(d) of the
Securities Exchange Act of 1934


Date of Report
(Date of earliest event reported):  May 2, 2016


AEGION CORPORATION
(Exact name of registrant as specified in its charter)


Delaware
 
001-35328
 
45-3117900
(State or other jurisdiction of incorporation)
 
(Commission File Number)
 
(IRS Employer Identification No.)


17988 Edison Avenue, Chesterfield, Missouri
 
 
63005
(Address of principal executive offices)
 
 
(Zip Code)


Registrant’s telephone number, including area code: (636) 530-8000


Check the appropriate box below if the Form 8-K filing is intended to simultaneously satisfy the filing obligation of the registrant under any of the following provisions:

[ ]
Written communications pursuant to Rule 425 under the Securities Act (17 CFR 230.425)
[ ]
Soliciting material pursuant to Rule 14a-12 under the Exchange Act (17 CFR 240.14a-12)
[ ]
Pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act (17 CFR 240.14d-2(b))
[ ]
Pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act (17 CFR 240.13e-4(c))







Item 2.02.
Results of Operations and Financial Condition.

Aegion Corporation (the “Company”) issued an earnings release (the “Earnings Release”) on May 2, 2016 to announce its financial results for the quarter ended March 31, 2016. A copy of the Earnings Release is furnished herewith as Exhibit 99.1. On May 3, 2016, the Company held a conference call in connection with the Earnings Release. A transcript of the conference call is furnished herewith as Exhibit 99.2.

The information in this Current Report on Form 8-K, including Exhibits 99.1 and 99.2, is being furnished and shall not be deemed “filed” for purposes of Section 18 of the Securities Exchange Act of 1934, as amended, nor shall it be deemed incorporated by reference in any filing under the Securities Act of 1933, as amended.

Item 9.01.
Financial Statements and Exhibits.
 
(d)
The following exhibits are filed as part of this report:

 
Exhibit Number
Description
 
99.1
Earnings Release of Aegion Corporation dated May 2, 2016, filed herewith.
 
 
 
 
99.2
Transcript of Aegion Corporation’s May 3, 2016 conference call, filed herewith.

*     *     *






SIGNATURES

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned hereunto duly authorized.


 
AEGION CORPORATION
 
 
 
 
 
 
 
 
 
 
By:
/s/ David F. Morris
 
 
 
David F. Morris
 
 
 
Executive Vice President, General Counsel and Chief Administrative Officer
 


Date: May 5, 2016







INDEX TO EXHIBITS

These exhibits are numbered in accordance with the Exhibit Table of Item 601 of Regulation S-K.

Exhibit
Description
99.1
Earnings Release of Aegion Corporation dated May 2, 2016.
 
 
99.2
Transcript of Aegion Corporation’s May 3, 2016 conference call.




EX-99.1 2 exhibit991-2016q1earningsr.htm EXHIBIT 99.1 (1Q16 EARNINGS RELEASE) Exhibit


Exhibit 99.1

AEGION CORPORATION REPORTS
2016 FIRST QUARTER FINANCIAL RESULTS

Adjusted (non-GAAP) 2016 first quarter earnings were $0.12 per diluted share compared to adjusted earnings of $0.13 per diluted share in the first quarter of 2015. On a GAAP basis, 2016 first quarter loss was $0.11 per diluted share compared to net income of $0.04 per diluted share in the prior year.

Consolidated cash and cash equivalents at March 31, 2016 were $127.9 million, an $8.1 million decline from March 31, 2015. The decline in cash and cash equivalents was due substantially to funding for the acquisition of Underground Solutions, Inc. in February 2016.

Consolidated contract backlog at March 31, 2016 was $756.7 million, an increase of approximately 1.0 percent from March 31, 2015.

St. Louis, MO - May 2, 2016 - Aegion Corporation (Nasdaq Global Select Market: AEGN) today reported financial results for the first quarter of 2016. On a GAAP reporting basis, there was a net loss of $3.8 million, or $0.11 per diluted share, compared to net income of $1.4 million, or $0.04 per diluted share. Excluding acquisition-related expenses in both time periods and charges associated with the restructuring plan announced on January 6, 2016 (the “2016 Restructuring”) and Aegion’s strategic realignment and restructuring plan announced in October 2014 (the “2014 Restructuring”), adjusted net income for the first quarters of 2016 and 2015 were $4.3 million, or $0.12 per diluted share, and $4.8 million, or $0.13 per diluted share, respectively.

Aegion’s President and Chief Executive Officer, Charles R. Gordon commented, “Our first quarter operating results were in line with our expectations and represent a good start to the year. We plan to take advantage of stable conditions across many of the Company’s end markets, realize our cost reduction targets and improve execution to deliver full year 2016 adjusted earnings per share in line with 2015 results. The acquisition of Underground Solutions and the divestiture of our Canadian pipe coating business earlier this year are examples of how we are aligning our portfolio around two strategic markets, urban infrastructure and midstream pipelines. These core markets provide the Company with the opportunity for long-term stable organic growth.”



1



CONTRACT BACKLOG
(Unaudited, in millions)
The following table sets forth consolidated backlog by segment (in millions):
 
March 31, 2016
 
December 31, 2015
 
March 31,
2015
Infrastructure Solutions (1)
$
327.6

 
$
311.2

 
$
354.2

Corrosion Protection
259.9

 
272.5

 
159.3

Energy Services (2) (3)
169.2

 
192.8

 
238.2

Total backlog
$
756.7

 
$
776.5

 
$
751.7

_________________________________
(1) 
March 31, 2016, December 31, 2015 and March 31, 2015 included backlog from restructured entities of zero, $0.5 million and $7.7 million, respectively.
(2) 
March 31, 2016, December 31, 2015 and March 31, 2015 included upstream-related backlog of $34.4 million, $41.1 million and $83.0 million, respectively.
(3) 
Represents expected unrecognized revenues to be realized under long-term Master Service Agreements and other signed contracts. If the remaining term of these arrangements exceeds 12 months, the unrecognized revenues attributable to such arrangements included in backlog are limited to only the next 12 months of expected revenues.
March 31, 2016 compared to March 31, 2015
Consolidated contract backlog increased approximately 1.0 percent to $756.7 million. The backlog comparison includes the impact from the Company’s decision to downsize in certain high-cost upstream markets in early 2016, remaining backlog in the restructured international CIPP contracting markets in 2015 and a large pipe coating and insulation contract added to backlog at December 31, 2015.
Infrastructure Solutions’ backlog declined $26.6 million, or 7.5 percent, to $327.6 million. In the North American water and wastewater market, backlog was the second highest for a first quarter period compared to record first quarter backlog at March 31, 2015. Current backlog is representative of a continued robust market in North America. Underground Solutions contributed $11.5 million to backlog at March 31, 2016. There was an $8 million negative variance due to remaining backlog in 2015 associated with the exit of contracting activities in several international wastewater pipeline rehabilitation markets. In addition, a large pressure pipe rehabilitation project for the nuclear industry, valued at approximately $13 million, was included in contract backlog at March 31, 2015 and was completed during 2015.
Corrosion Protection backlog increased $100.6 million, or 63.1 percent, to $259.9 million because of the Company’s deepwater pipe coating and insulation contract, valued at over $130 million, signed during the fourth quarter of 2015. Partially offsetting the increase in backlog were the Company’s February 2016 sale of its 51 percent stake in its Canadian pipe coating joint venture and the negative impact from further reductions in capital and maintenance expenditures by upstream customers, particularly in the Canadian market. Backlog for the midstream market is at adequate levels consistent with the expectations for 2016.
Energy Services backlog declined $69.0 million, or 29.0 percent, to $169.2 million as a result of a significant decline in upstream backlog associated with the non-renewal in late 2015 of two long-term upstream maintenance contracts in Central California and the decision to downsize the upstream operations in January 2016. Downstream backlog declined modestly due to an expected reduction in turnaround activity in 2016.


2



Aegion Realignment and Restructuring

2016 Restructuring

On January 4, 2016, the Company’s board of directors approved the 2016 Restructuring to downsize its exposure in the upstream oil markets and to reduce consolidated costs. As part of management’s ongoing assessment of its energy-related businesses, the Company determined the persistent low price of oil is expected to create market challenges for the foreseeable future, including reduced customer spending in 2016. During the first quarter of 2016, the Company made significant progress toward completing the objectives of the 2016 Restructuring, including downsizing Energy Services’ upstream operations in Central California, reducing Corrosion Protection’s upstream exposure by divesting its interest in a Canadian pipe coating joint venture, right-sizing Corrosion Protection to compete more effectively and reducing corporate and other operating costs.

The 2016 Restructuring is expected to reduce costs by $15.0 to $16.0 million, more than originally planned, with most of the cost reductions expected to be realized in 2016 primarily through headcount reductions and office closures. The Company expects to reduce headcount by approximately 900 employees, or 14.5% of the total workforce. Headcount reductions totaled 705 as of March 31, 2016. The Company expects to substantially complete the restructuring in the second quarter of 2016 and record total estimated pre-tax charges between $11.0 to $13.0 million, most of which will be cash charges. This is an increase from the original estimate of $7.0 to $9.0 million. The actual and anticipated charges consist primarily of employee severance, extension of benefits, employment assistance programs, early lease termination and other restructuring costs. Total pre-tax restructuring charges during the first quarter of 2016 were $9.7 million ($6.6 million after tax), all of which were cash charges. The higher cost was due to additional headcount reductions and associated costs to complete existing projects in the Central California operations, which have taken longer than originally anticipated.


Consolidated Highlights

First Quarter 2016 versus First Quarter 2015
The Company reports its results on a GAAP and adjusted (non-GAAP) basis. Adjusted measures exclude certain pre-tax charges and are reconciled to the most directly comparable GAAP measures beginning on page 8.

Consolidated revenues declined $15.3 million, or 4.9 percent, to $293.9 million. Favorable contributors included revenue growth in the North American water and wastewater pipeline rehabilitation market compared to record performance in the prior year, a $4.7 million contribution from the acquisition of Underground Solutions, which closed on February 18, 2016, and completion of several refinery turnaround projects in the Energy Services platform. Two primary factors offset the revenue contribution in the quarter. First, customer-driven reduction of two large upstream contracts and the strategic decision to downsize the upstream exposure in the high-cost oil extraction markets in Canada and Central California negatively impacted the Corrosion Protection and Energy Services platforms, respectively. Second, the broader Canadian energy market is under more pressure this year than in 2015, which negatively affected revenues for Corrosion Protection compared to much higher revenues in the prior year. As a result, Infrastructure Solutions increased revenues by $3.3 million, or 2.7 percent, to $125.8 million. Revenues for Corrosion Protection declined $9.3 million, or 9.1 percent, to $92.4 million. Revenues for Energy Services declined $9.3 million, or 10.9 percent, to $75.7 million. Foreign currency translation adversely impacted consolidated revenues by $5.6 million, mostly in Corrosion Protection, but also within Infrastructure Solutions.

3




Consolidated adjusted gross profit decreased $3.5 million, or 6.0 percent, to $55.7 million. Adjusted gross margins declined 20 basis points to 18.9 percent. The decline in consolidated adjusted gross profit and margins was primarily the result of the factors impacting revenue performance noted above. Corrosion Protection’s performance was particularly affected by the impact of the market factors in Canada, where historical margins are the highest in the segment. In Energy Services, gross profit was negatively impacted by additional upstream costs in Central California to complete the remaining maintenance contracts, cost overruns on certain lump-sum construction projects and higher start up costs for certain turnaround projects in the downstream operations. Infrastructure Solutions gross profit and margins increased during the first quarter of 2016 because of continued improvements in the North American operations and a $2.6 million contribution from Underground Solutions. In terms of segment performance, adjusted gross profit for Infrastructure Solutions increased $2.4 million, or 8.2 percent, to $31.0 million and adjusted gross margins increased 120 basis points to 24.6 percent. Gross profit for Corrosion Protection declined $3.6 million, or 17.4 percent, to $17.2 million and gross margins declined 190 basis points to 18.6 percent. Energy Services’ gross profit declined $2.3 million, or 23.3 percent, to $7.5 million and margins declined 160 basis points to 9.9 percent. Foreign currency translation adversely impacted consolidated gross profit by approximately $1.0 million, mostly in Corrosion Protection, but also within Infrastructure Solutions.

Consolidated adjusted operating expenses decreased $0.9 million, or 1.9 percent, to $48.0 million. As a percent of consolidated revenues, the adjusted operating expense ratio increased 50 basis points to 16.3 percent. The Company realized approximately $3.5 million in operating expense reductions from the 2016 Restructuring, in line with expectations. Adjusted operating expenses for Infrastructure Solutions increased 2.5 percent to $21.0 million. Operating expenses included $1.4 million from the February 2016 acquisition of Underground Solutions, which offset additional cost savings from the integration of the operations within Infrastructure Solutions, which began in the fourth quarter of 2014, and continued cost containment efforts in the European operations. Adjusted operating expenses for Corrosion Protection declined 1.0 percent to $20.1 million and declined 15.2 percent to $6.9 million for Energy Services, both as a result of the actions taken with respect to the 2016 Restructuring. Foreign currency translation favorably impacted consolidated operating expenses by approximately $1.0 million, primarily in Corrosion Protection, but also within Infrastructure Solutions.

Consolidated adjusted operating income declined $2.6 million, or 25.5 percent, to $7.7 million. Adjusted operating margins declined 70 basis points to 2.6 percent. Infrastructure Solutions’ adjusted operating income increased $1.9 million, or 22.7 percent, to $10.0 million due to strong performance in North America in the water and wastewater pipeline rehabilitation market and a $1.3 million contribution from Underground Solutions. Adjusted operating margins increased 130 basis points to 8.0 percent. Corrosion Protection’s adjusted operating loss was $2.9 million and Energy Services recognized adjusted operating income of $0.6 million. Both of these segments were impacted by the higher-cost oil extraction markets, which resulted in the decision to reduce the Company’s upstream exposure. Corrosion Protection’s performance was negatively affected by more difficult market conditions in Canada associated with the upstream and midstream markets compared to strong activity in the prior year. Foreign currency translation was not material to the platform or consolidated results for operating income.

During the first quarter of 2016, the Company recognized $1.1 million in currency losses in Other Income/(Expense) related to the revaluation of dollar denominated deposits in certain international locations.

The effective tax rate on a GAAP basis was a benefit of 54.6 percent on a pre-tax loss. The Company recorded a $1.9 million benefit to consolidated taxes and net income related to the corporate tax valuation

4



allowance as a result of changes in the realization of future tax benefits. Excluding the tax effects from the restructuring charges and acquisition-related expenses in the first quarter of 2016, the adjusted effective tax rate was a negative 33.9 percent. The Company anticipates the adjusted effective tax rate in the remaining quarters and full year 2016 will be approximately 30 percent because of the expectation for a greater proportion of earnings in higher tax jurisdictions, primarily the United States.

Cash Flow
First quarter 2016 compared to first quarter 2015

Net cash flow used by continuing operations was $2.0 million compared to $12.2 million used in the prior year. This follows the typical pattern of cash flow from operating activities being at the seasonally lowest during the first quarter of the year. Net changes in working capital was a $11.6 million use of cash compared to a $25.8 million use of cash in the same period last year. Days sales outstanding on receivables decreased approximately 10 days, excluding several large deposits related to a pipe coating and insulation coating project received during the first quarter of 2016. The improvement in cash collections was largely offset by an increase in payments for accounts payable and accrued expenses.

Net cash flow used by investing activities was $91.8 million compared to $11.5 million used in the prior year. The Company used $85.2 million, net of cash acquired, to acquire Underground Solutions on February 18, 2016. Approximately $60 million of the purchase price was funded from existing cash balances with the remainder drawn from the Company’s line of credit. Capital expenditures were $10.1 million compared to $4.2 million in the prior year. The increase in capital expenditures primarily reflects plant upgrades related to an upcoming large pipe coating and insulation contract at the Company’s Louisiana pipe coating facility. In the first quarter 2016, the Company received proceeds of $7.6 million for the sale of the Company’s 51 percent interest in Bayou Perma-Pipe, Ltd., following the decision to reduce the Company’s exposure in the Western Canadian oil market.

Net cash flows from financing activities provided $13.3 million compared to $11.7 million used in the prior year. The Company used $16.3 million to repurchase 910,656 shares of Company common stock through open market purchases and in connection with the Company’s equity compensation programs. The Company borrowed $34.0 million from its line of credit during the first quarter of 2016, primarily to fund the acquisition of Underground Solutions, and made payments of $4.4 million related to long-term debt. During the first quarter of 2015, the Company used net cash of $6.2 million to repurchase stock and $6.5 million to pay down the principal balance on its long-term debt.

Net cash flow for the first quarter of 2016 was an outflow of $83.8 million, which included a $3.4 million negative impact from currency exchange rate changes. This compares to a cash outflow of $39.0 million in the first quarter of 2015.

About Aegion

Aegion Corporation is a global leader in infrastructure protection and maintenance, providing proprietary technologies and services: (i) to protect against the corrosion of industrial pipelines; (ii) to rehabilitate and strengthen water, wastewater, energy and mining piping systems and buildings, bridges, tunnels and waterfront structures; and (iii) to utilize integrated professional services in engineering, procurement, construction, maintenance and turnaround services for a broad range of energy related industries. Aegion’s business activities include manufacturing, distribution, maintenance, construction, installation, coating and insulation, cathodic protection, research and development and licensing. More information about Aegion can be found on our internet site at www.aegion.com.

5




Forward-Looking Statements

The Private Securities Litigation Reform Act of 1995 provides a “safe harbor” for forward-looking statements. Aegion’s forward-looking statements in this news release represent its beliefs or expectations about future events or financial performance. These forward-looking statements are based on information currently available to Aegion and on management’s beliefs, assumptions, estimates or projections and are not guarantees of future events or results. When used in this document, the words “anticipate,” “estimate,” “believe,” “plan,” “intend, “may,” “will” and similar expressions are intended to identify forward-looking statements, but are not the exclusive means of identifying such statements. Such statements are subject to known and unknown risks, uncertainties and assumptions, including those referred to in the “Risk Factors” section of Aegion’s Annual Report on Form 10-K for the year ended December 31, 2015, as filed with the Securities and Exchange Commission on February 29, 2016, and in subsequently filed documents. In light of these risks, uncertainties and assumptions, the forward-looking events may not occur. In addition, Aegion’s actual results may vary materially from those anticipated, estimated, suggested or projected. Except as required by law, Aegion does not assume a duty to update forward-looking statements, whether as a result of new information, future events or otherwise. Investors should, however, review additional disclosures made by Aegion from time to time in Aegion’s filings with the Securities and Exchange Commission. Please use caution and do not place reliance on forward-looking statements. All forward-looking statements made by Aegion in this news release are qualified by these cautionary statements.

About Non-GAAP Financial Measures

Aegion has presented certain information in this release excluding certain items that impacted income, expense and earnings per share from continuing operations. The adjusted earnings per share in the quarters ended March 31, 2016 and 2015 exclude certain charges related to the Company’s restructuring efforts and acquisition-related expenses.

Aegion management uses such non-GAAP information internally to evaluate financial performance for Aegion’s operations because Aegion’s management believes such non-GAAP information allows management to more accurately compare Aegion’s ongoing performance across periods. As such, Aegion’s management believes that providing non-GAAP financial information to Aegion’s investors is useful because it allows investors to evaluate Aegion’s performance using the same methodology and information used by Aegion management.

Aegion®, the Aegion® logo, Fyfe®, Schultz Mechanical™ and Underground Solutions® are registered trademarks of Aegion Corporation and its affiliates. (AEGN-ER)
CONTACT:
Aegion Corporation
 
David A. Martin, Executive Vice President and Chief Financial Officer
 
(636) 530-8000


6



AEGION CORPORATION AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF OPERATIONS
(Unaudited)
(in thousands, except share and per share information)

 
For the Quarters Ended
March 31,
 
2016
2015
Revenues
$
293,908

$
309,166

Cost of revenues
239,494

249,976

Gross profit
54,414

59,190

Operating expenses
50,725

49,084

Acquisition-related expenses
1,031

323

Restructuring charges
6,797

658

Operating income (loss)
(4,139
)
9,125

Other income (expense):
 
 
Interest expense
(3,615
)
(3,232
)
Interest income
32

126

Other
(973
)
(2,779
)
Total other expense
(4,556
)
(5,885
)
Income (loss) before taxes on income
(8,695
)
3,240

Taxes (benefit) on income (loss)
(4,746
)
1,868

Net income (loss)
(3,949
)
1,372

Non-controlling interests
157

(13
)
Net income (loss) attributable to Aegion Corporation
$
(3,792
)
$
1,359

 
 
 
Earnings (loss) per share attributable to Aegion Corporation:
 
 
Basic
$
(0.11
)
$
0.04

Diluted
$
(0.11
)
$
0.04

 
 
 
 
 
 
Weighted average shares outstanding - Basic
35,488,580

37,309,829

Weighted average shares outstanding - Diluted
35,488,580

37,541,549




7



AEGION CORPORATION AND SUBSIDIARIES
STATEMENT OF OPERATIONS RECONCILIATION
(Unaudited) (Non-GAAP)
(in thousands, except share and per share information)


For the Quarter Ended March 31, 2016
 
As Reported
(GAAP)
 
Restructuring
Charges
 
Acquisition-
Related
Expenses
 
As Adjusted
(Non-GAAP)
 
 
(1)
 
(2)
 
Affected Line Items:
 
 
 
 
 
 
 
Cost of revenues
$
239,494

 
$
(35
)
 
$
(1,209
)
 
$
238,250

Gross profit
54,414

 
35

 
1,209

 
55,658

Operating expenses
50,725

 
(2,730
)
 

 
47,995

Acquisition-related expenses
1,031

 

 
(1,031
)
 

Restructuring charges
6,797

 
(6,797
)
 

 

Operating income (loss)
(4,139
)
 
9,562

 
2,240

 
7,663

Income (loss) before taxes on income
(8,695
)
 
9,562

 
2,240

 
3,107

Taxes (benefit) on income (loss)
(4,746
)
 
3,084

 
609

 
(1,053
)
 
 
 
 
 
 
 
 
Net income (loss) attributable to Aegion Corporation (3)
(3,792
)
 
6,478

 
1,631

 
4,317

 
 
 
 
 
 
 
 
Diluted earnings (loss) per share:
 
 
 
 
 
 
 
Net income (loss) attributable to Aegion Corporation (3)
$
(0.11
)
 
$
0.18

 
$
0.05

 
$
0.12

_________________________________
(1) 
Includes the following non-GAAP adjustments: (i) pre-tax restructuring charges for cost of revenues of $35 related to the write-off of certain other assets; (ii) pre-tax restructuring charges for operating expenses of $2,730 related to wind-down and other restructuring-related charges; and (iii) pre-tax restructuring charges of $6,797 related to employee severance, extension of benefits, employment assistance programs and early lease termination costs in accordance with ASC 420, Exit or Disposal Cost Obligations, and recorded as “Restructuring charges” in the Consolidated Statements of Operations. The vast majority of restructuring charges relate to the 2016 Restructuring.
(2) 
Includes the following non-GAAP adjustments: (i) inventory step up expense of $1,209 for cost of revenues recognized as part of the accounting for business combinations in connection with the Company’s acquisition of Underground Solutions; and (ii) expenses of $1,031 incurred in connection with the Company’s acquisition of Underground Solutions and other potential acquisition activity pursued by the Company during the period.
(3) 
Includes non-controlling interests.

8



AEGION CORPORATION AND SUBSIDIARIES
STATEMENT OF OPERATIONS RECONCILIATION
(Unaudited) (Non-GAAP)
(in thousands, except share and per share information)


For the Quarter Ended March 31, 2015
 
As Reported
(GAAP)
 
Restructuring
Charges
 
Acquisition-Related Expenses
 
As Adjusted
(Non-GAAP)
 
 
(1)
 
(2)
 
Affected Line Items:
 
 
 
 
 
 
 
Cost of revenues
$
249,976

 
$
(14
)
 
$

 
$
249,962

Gross profit
59,190

 
14

 

 
59,204

Operating expenses
49,084

 
(163
)
 

 
48,921

Acquisition-related expenses
323

 

 
(323
)
 

Restructuring charges
658

 
(658
)
 

 

Operating income
9,125

 
835

 
323

 
10,283

Other income (expense):
 
 
 
 
 
 
 
Interest expense
(3,232
)
 
42

 

 
(3,190
)
Other
(2,779
)
 
2,661

 

 
(118
)
Income before taxes on income
3,240

 
3,538

 
323

 
7,101

Taxes on income
1,868

 
265

 
128

 
2,261

 
 
 
 
 
 
 
 
Net income attributable to Aegion Corporation (3)
1,359

 
3,273

 
195

 
4,827

 
 
 
 
 
 
 
 
Diluted earnings per share:
 
 
 
 
 
 
 
Net income attributable to Aegion Corporation (3)
$
0.04

 
$
0.09

 
$

 
$
0.13

_________________________________
(1) 
Includes the following non-GAAP adjustments: (i) pre-tax restructuring charges for cost of revenues of $14 related to the write-off of certain other assets; (ii) pre-tax restructuring charges for operating expenses of $163 related to allowance for bad debts and other restructuring-related charges; (iii) pre-tax restructuring charges of $658 related to employee severance, extension of benefits, employment assistance programs and early lease termination costs in accordance with ASC 420, Exit or Disposal Cost Obligations, and recorded as “Restructuring charges” in the Consolidated Statements of Operations; and (iv) pre-tax restructuring charges of $2,703 related primarily to the write-off of certain other assets, including the loss on the sale of the CIPP contracting operation in France.
(2) 
Includes non-GAAP adjustments related to expenses incurred in connection with the Company’s acquisition of Schultz Mechanical Contractors and other potential acquisition activity pursued by the Company during the period.
(3) 
Includes non-controlling interests.


9



Segment Reporting
Infrastructure Solutions
(in thousands)
Quarter Ended March 31, 2016
 
Quarter Ended March 31, 2015
 
As
Reported
(GAAP)
 
Adjustments
(1)
 
As
Adjusted
(Non-GAAP)
 
As
Reported
(GAAP)
 
Adjustments
(2)
 
As
Adjusted
(Non-GAAP)
 
 
 
 
 
Revenues
$
125,762

 
$

 
$
125,762

 
$
122,473

 
$

 
$
122,473

Cost of revenues
96,018

 
(1,244
)
 
94,774

 
93,858

 
(14
)
 
93,844

Gross profit
29,744

 
1,244

 
30,988

 
28,615

 
14

 
28,629

Gross profit margin
23.7
%
 
 
 
24.6
%
 
23.4
%
 
 
 
23.4
%
Operating expenses
20,926

 
41

 
20,967

 
20,625

 
(163
)
 
20,462

Acquisition-related expenses
1,031

 
(1,031
)
 

 

 

 

Restructuring charges
1,979

 
(1,979
)
 

 
658

 
(658
)
 

Operating income
5,808

 
4,213

 
10,021

 
7,332

 
835

 
8,167

Operating margin
4.6
%
 
 
 
8.0
%
 
6.0
%
 
 
 
6.7
%
_________________________________
(1) 
Includes non-GAAP adjustments related to: (i) pre-tax restructuring charges associated with the write-off of certain other assets, severance and benefit related costs, and other restructuring charges; (ii) inventory step up expense recognized in connection with the Company’s acquisition of Underground Solutions; and (iii) acquisition expenses incurred primarily in connection with the Company’s acquisition of Underground Solutions.
(2) 
Includes non-GAAP adjustments related to pre-tax restructuring charges associated with reserves for potentially uncollectible receivables, early lease termination costs, severance and benefit related costs, and other restructuring charges.
Corrosion Protection
(in thousands)
Quarter Ended March 31, 2016
 
Quarter Ended March 31, 2015
 
As
Reported
(GAAP)
 
Adjustments
(1)
 
As
Adjusted
(Non-GAAP)
 
As
Reported
(GAAP)
 
Adjustments
 
As
Adjusted
(Non-GAAP)
 
 
 
 
 
Revenues
$
92,446

 
$

 
$
92,446

 
$
101,743

 
$

 
$
101,743

Cost of revenues
75,247

 

 
75,247

 
80,914

 

 
80,914

Gross profit
17,199

 

 
17,199

 
20,829

 

 
20,829

Gross profit margin
18.6
 %
 
 
 
18.6
 %
 
20.5
%
 
 
 
20.5
%
Operating expenses
20,449

 
(317
)
 
20,132

 
20,329

 

 
20,329

Restructuring charges
2,420

 
(2,420
)
 

 

 

 

Operating income (loss)
(5,670
)
 
2,737

 
(2,933
)
 
500

 

 
500

Operating margin
(6.1
)%
 
 
 
(3.2
)%
 
0.5
%
 
 
 
0.5
%
_________________________________
(1) 
Includes non-GAAP adjustments related to pre-tax restructuring charges associated with the write-off of certain other assets, severance and benefit related costs, and other restructuring charges.
Energy Services
(in thousands)
Quarter Ended March 31, 2016
 
Quarter Ended March 31, 2015
 
As
Reported
(GAAP)
 
Adjustments
(1)
 
As
Adjusted
(Non-GAAP)
 
As
Reported
(GAAP)
 
Adjustments
(2)
 
As
Adjusted
(Non-GAAP)
 
 
 
 
 
Revenues
$
75,700

 
$

 
$
75,700

 
$
84,950

 
$

 
$
84,950

Cost of revenues
68,229

 

 
68,229

 
75,204

 

 
75,204

Gross profit
7,471

 

 
7,471

 
9,746

 

 
9,746

Gross profit margin
9.9
 %
 
 
 
9.9
%
 
11.5
%
 
 
 
11.5
%
Operating expenses
9,350

 
(2,454
)
 
6,896

 
8,130

 

 
8,130

Acquisition-related expenses

 

 

 
323

 
(323
)
 

Restructuring charges
2,398

 
(2,398
)
 

 

 

 

Operating income (loss)
(4,277
)
 
4,852

 
575

 
1,293

 
323

 
1,616

Operating margin
(5.6
)%
 
 
 
0.8
%
 
1.5
%
 
 
 
1.9
%
_________________________________
(1) 
Includes non-GAAP adjustments related to pre-tax restructuring charges associated with the write-off of certain other assets, early lease termination costs, severance and benefit related costs, and other restructuring charges.
(2) 
Includes non-GAAP adjustments related to expenses incurred in conjunction with the Company’s acquisition of Schultz Mechanical Contractors.

10



AEGION CORPORATION AND SUBSIDIARIES
CONSOLIDATED BALANCE SHEETS
(Unaudited)
(in thousands, except share amounts)

 
March 31, 
 2016
 
December 31, 
 2015
Assets
 
 
 
Current assets
 
 
 
Cash and cash equivalents
$
127,859

 
$
209,253

Restricted cash
6,615

 
5,796

Receivables, net of allowances of $7,544 and $14,524, respectively
171,747

 
200,883

Retainage
36,708

 
37,285

Costs and estimated earnings in excess of billings
99,911

 
89,141

Inventories
63,432

 
47,779

Prepaid expenses and other current assets
62,811

 
66,999

Assets held for sale

 
21,060

Total current assets
569,083

 
678,196

Property, plant & equipment, less accumulated depreciation
151,086

 
144,833

Other assets
 
 
 
Goodwill
294,479

 
249,120

Identified intangible assets, less accumulated amortization
205,498

 
174,118

Deferred income tax assets
3,116

 
2,130

Other assets
5,120

 
5,616

Total other assets
508,213

 
430,984

Total Assets
$
1,228,382

 
$
1,254,013

 
 
 
 
Liabilities and Equity
 
 
 
Current liabilities
 
 
 
Accounts payable
$
66,655

 
$
72,732

Accrued expenses
99,619

 
112,951

Billings in excess of costs and estimated earnings
86,962

 
87,475

Current maturities of long-term debt and line of credit
17,649

 
17,648

Liabilities held for sale

 
6,961

Total current liabilities
270,885

 
297,767

Long-term debt, less current maturities
363,381

 
333,480

Deferred income tax liabilities
17,872

 
19,386

Other non-current liabilities
11,091

 
8,824

Total liabilities
663,229

 
659,457

 
 
 
 
Equity
 
 
 
Preferred stock, undesignated, $.10 par – shares authorized 2,000,000; none outstanding

 

Common stock, $.01 par – shares authorized 125,000,000; shares issued and outstanding 35,156,241 and 36,053,499, respectively
352

 
361

Additional paid-in capital
186,036

 
199,951

Retained earnings
421,782

 
425,574

Accumulated other comprehensive loss
(52,355
)
 
(47,861
)
Total stockholders’ equity
555,815

 
578,025

Non-controlling interests
9,338

 
16,531

Total equity
565,153

 
594,556

Total Liabilities and Equity
$
1,228,382

 
$
1,254,013


11



AEGION CORPORATION AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF CASH FLOWS
(Unaudited)
(in thousands)
 
For the Quarters Ended
March 31,
 
2016
 
2015
Cash flows from operating activities:
 
 
 
Net income (loss)
$
(3,949
)
 
$
1,372

 
 
 
 
Adjustments to reconcile to net cash used in operating activities:
 
 
 
Depreciation and amortization
11,376

 
10,486

Gain on sale of fixed assets
(499
)
 
(200
)
Equity-based compensation expense
2,363

 
1,663

Deferred income taxes
(1,187
)
 
(969
)
Non-cash restructuring charges
(212
)
 
(1,359
)
Loss on sale of businesses

 
2,864

Loss on foreign currency transactions
1,131

 
216

Other
(485
)
 
(394
)
Changes in operating assets and liabilities (net of acquisitions):
 
 
 
Restricted cash related to operating activities
462

 
(1,093
)
Receivables net, retainage and costs and estimated earnings in excess of billings
29,618

 
(17,442
)
Inventories
(1,806
)
 
(3,455
)
Prepaid expenses and other assets
3,382

 
2,379

Accounts payable and accrued expenses
(39,086
)
 
(24,146
)
Billings in excess of costs and estimated earnings
(3,672
)
 
16,896

Other operating
582

 
981

Net cash used in operating activities
(1,982
)
 
(12,201
)
 
 
 
 
Cash flows from investing activities:
 
 
 
Capital expenditures
(10,060
)
 
(4,234
)
Proceeds from sale of fixed assets
956

 
297

Patent expenditures
(541
)
 
(7
)
Restricted cash related to investing activities
(1,086
)
 

Purchase of Underground Solutions, Inc., net of cash acquired
(85,167
)
 

Purchase of Schultz Mechanical Contractors, Inc.
(500
)
 
(6,479
)
Sale of interest in Bayou Perma-Pipe Canada, Ltd., net of cash disposed
4,599

 

Payment to Fyfe Asia sellers for final net working capital

 
(1,098
)
Net cash used in investing activities
(91,799
)
 
(11,521
)
 
 
 
 
Cash flows from financing activities:
 
 
 
Proceeds from issuance of common stock upon stock option exercises, including tax effects
38

 
1,399

Repurchase of common stock
(16,325
)
 
(7,622
)
Proceeds from notes payable

 
1,505

Proceeds from line of credit
34,000

 
26,000

Principal payments on long-term debt
(4,375
)
 
(33,031
)
Net cash provided by (used in) financing activities
13,338

 
(11,749
)
Effect of exchange rate changes on cash
(3,394
)
 
(3,569
)
Net decrease in cash and cash equivalents for the period
(83,837
)
 
(39,040
)
Cash and cash equivalents, beginning of year
211,696

 
174,965

Cash and cash equivalents, end of period
$
127,859

 
$
135,925


12
EX-99.2 3 exhibit992-2016q1conferenc.htm EXHIBIT 99.2 (1Q16 EARNINGS CALL TRANSCRIPT) Exhibit



Exhibit 99.2

AEGION CORPORATION
May 3, 2016
9:30 a.m. ET

Operator:    This is conference 85491365.

Good morning, and welcome to the Aegion Corporation 2016 first-quarter earnings call. At this time, all participants are in a listen-only mode. Later, there will be a question-and-answer session, and instructions will follow at that time. (Operator Instructions). As a reminder, this event is being recorded.

It is my pleasure to turn the call over to your host, Ruben Mella, Vice President of Investor Relations. Ruben, you may proceed.

Ruben Mella:    Good morning, and thank you for joining us today. On the line with me are Chuck Gordon, President and Chief Executive Officer; and David Martin, Executive Vice President and Chief Financial Officer. We have posted a presentation that will be referenced during their prepared remarks on our website at Aegion.com/investors. You will find our Safe Harbor statement in the presentation and press release.

During this call, and in the presentation materials, the Company will make forward-looking statements, which are inherently subject to risks and uncertainty. The Company does not assume the duty to update forward-looking statements.

I will now turn the call over to Chuck Gordon. Chuck.

Charles Gordon:    Thank you, Ruben, and good morning to all of you joining us on the call and webcast. If you turn to slide 2, there are three themes I want you to remember from the call this morning.

First, we delivered solid Q1 results that were generally in line with expectations for our operating results, as Infrastructure Solutions helped to reduce the impact from a more challenging upstream energy market, especially in Canada.

Second, we are gaining confidence that our projected adjusted earnings in 2016 will be largely in line with the results in 2015, based on the order pattern and backlog for Infrastructure Solutions and Corrosion Protection's midstream market, as well as progress on our cost reduction initiative and the schedule to start the Appomattox project.

Third, we will continue to align Aegion with our strategic focus to take advantage of the opportunities we see for long-term, sustainable, organic growth, primarily in the urban infrastructure and midstream pipeline markets. David will provide insights into the quarterly results in a few minutes. I will focus my remarks on the current environment and outlook for 2016.

Turning to slide 3. Coming off a record financial performance in 2015, the outlook for Infrastructure Solutions' Insituform cured-in-place pipe, or CIPP, technologies in the important North America water and wastewater pipeline market remains on track for another good year. I'm pleased with the results in Q1 as we outperformed last year through increased project activity and improved execution.

Backlog at the end of March was the second highest ever for a Q1 time period, although behind our record backlog for this time of year in 2015. We are very pleased with our position heading into the summer construction season in a healthy North American CIPP market.


1



Global backlog was down 8% to $327 million. There were two unique events which impacted backlog. First, we successfully completed a large nuclear project in Q2 and Q3 of last year valued at approximately $13 million. Second, we completed in 2015 about $8 million of CIPP contracting activities in a couple of remaining markets in Asia that were part of restructuring. A third effect was the record North American water and wastewater backlog at the end of Q1 2015.

A key aspect of our urban Infrastructure Strategy is to grow the North America pressure pipe market in both the municipal water and industrial sectors. The North America pressure pipe market is an attractive one for us, as it is slightly larger than the wastewater market and growing at a faster rate, as you can see on slide 4.

While the first quarter is traditionally the smallest quarter of the year for most of Aegion, some encouraging signs emerged from the first quarter results.

First, Underground Solutions made a positive contribution to the first-quarter results and also added approximately $12 million in Q1 backlog. Underground Solutions is a very well-run business and the integration is proceeding ahead of expectations. Their good performance in Q1 supports our view that Underground Solutions' contributions for the full year will be accretive to EPS.

Second, we successfully executed several emergency large-diameter municipal pressure pipe rehabilitation projects during the quarter using our Tyfo Fibrwrap system. As I mentioned earlier, we completed a pressure pipe rehabilitation project in the nuclear industry during 2015 with this technology solution.

We don't have another project of that size in our sales funnel at the moment, so this will be a headwind for us throughout the year. However, we should benefit from more typical smaller project activity to nearly make up for the contribution from this large project last year.

Third, we recently announced a $6.8 million municipal contract in the city of West Palm Beach, Florida, to use the Insituform Insitumain product to rehabilitate approximately 6,000 feet of 48-inch diameter forced main sewer pipeline. This is a good win for us to use an improved CIPP product in the pressure pipe market.

Finally, we are in the process of executing a large project in Pennsylvania using our Tite Liner HDBE lining solution to rehabilitate about 4 miles of 30-inch diameter municipal forced main pipeline.

These are a few examples of how the diverse portfolio we have assembled can allow us to offer customers the best solution to rehabilitate their pressure pipe assets. We're encouraged with the start to 2016 and the health of our end markets, primarily in North America, which gives us confidence we are well-positioned to expect Infrastructure Solutions to organically grow full-year revenues and operating income by low-single digits over 2015, excluding the contribution from Underground Solutions.

Let's turn to Corrosion Protection on page -- on slide 5. The challenges we discussed in Q4 -- on the Q4 call came in as expected in the first quarter. What a difference a year makes, as the upstream markets in North America are under much more pressure this year than in 2015, especially in Canada. Last year, we enjoyed the last remnants of the strong backlog from the days of higher oil prices during the Canadian winter construction season. The market has fundamentally changed as a result of persistent low oil prices, which we believe will continue for some time.

As we anticipated, there will be limited opportunities in 2016, which will create more volatility for Corrosion Protection as existing projects are completed until the start of the Appomattox contract. Four months into the year, and we've already confirmed the actions we announced in January to rightsize our upstream operations were the right ones for Aegion. We are finished

2



the cost reduction effort not only in Corrosion Protection, but across the Company to be -- more effectively compete in the current market environment.

We completed the sale of our 51% stake in the Canadian JV, and we are reducing our exposure in the Central California Bakersfield market. As with all cycles, the energy market will eventually recover, although the duration this time has been surprising to us. As recovery happens, we believe our differentiated technologies and agile business model within Corrosion Production can serve us well in North America, the Middle East, and other markets to protect and monitor oil and gas pipelines from the effects of corrosion.

We continue our preparations for the Shell Appomattox contract. Construction of the new insulation coating facility is on schedule, and we are working with our material vendor, Materia, to be ready for full-scale pipe coating and application of the differentiated insulation technology in the fourth quarter of this year.

The activity we've seen so far in the midstream market seems to confirm our belief there will be modest growth in capital maintenance spending in the US. We can't ignore the risk for project delays and possible cancellation of new construction, although we have not seen any cancellations to date. Our backlog for the midstream market grew about 10% on a year-over-year basis at the end of Q1 2015, which is an encouraging sign for this important market segment.

I'm pleased with the progress we are making with our initiative to develop an asset integrity management program, shown on slide 6. As I mentioned in the Q4 call, we perform an important service for our customers by collecting pipeline readings from cathodic protection systems we install. Our engineers, in turn, analyze the information to help customers identify areas where there may be issues with corrosion.

We are in the development phase to commercialize our asset integrity program, including actively working with select customers this year to refine the program. At a minimum, we expect this effort will expand our business with existing customers by further strengthening those relationships and opportunities to serve them.

Backlog for Corrosion Protection at March 31, 2016, including the Appomattox contract, was up 63% to $260 million compared to the prior year. We do expect improved performance for us in the midstream market with some top-line growth, but more importantly, an operating income improvement as a result of our actions to reduce costs.

We continue to expect full-year revenue for Corrosion Protection to be in line with what we achieved in 2015, assuming the Appomattox project begins, as we continue to expect it to in the fourth quarter. Under this scenario, and with the expected benefits of our cost reduction efforts, we estimate operating income for Corrosion Protection in 2016 to also be in line with what we achieved in 2015.

Let's turn to Energy Services on slide 7. David will provide more details, but Energy Services' performance was below what we expected in Q1, mainly because of higher costs to close out several lump sum projects, primarily in the upstream market, which allows us to go on, on a go-forward basis, to focus on the core business of downstream maintenance services.

Backlog for Energy Services declined $69 million to $169 million from the prior year. The majority of the decline came from the downsizing of our upstream operations caused by the significant reduction in two large contracts worth about $70 million in annual revenues.

I will note the backlog comparison for the remainder of the year will also be impacted by the upstream downsizing. A portion of the backlog decline in Q1 was also in the West Coast downstream market, as we completed four large turnaround events during the quarter, with no meaningful turnarounds expected this fall compared to an unusually good fall season in 2015.


3



One last headwind to note was the significant increase in billable hours in 2015 related to the USW strike, and the cleanup and repair efforts after the incident at the Torrance, California refinery. Nevertheless, downstream market conditions remain favorable, based on the robust maintenance schedule we have with our customers.

These factors will mean an expected reduction in full revenues to approximately $250 million, due to the downsize in the upstream market, the one-time benefits last year from additional billable hours in the West Coast downstream market, and a lack of turnaround activity this fall. The cost reductions associated with the restructuring will help Energy Service to maintain operating margin in line with our 2015 results. However, that will occur in the remainder of 2016, as it will be difficult to make up the higher costs in Q1.

Let me conclude with the key themes from the beginning of my remarks. Our first-quarter results further demonstrate the resilience of our Company since the start of the energy market down-cycle. We expect that resiliency to continue, and the remainder of 2016 to deliver adjusted EPS in 2016, in line with our results in 2015.

The decision to downsize our presence in the upstream market was not easy. We expect a 14% reduction in our workforce as a result of restructuring. As CEO, I recognize the transformation our Company has gone through over the last 18 months. However, it was necessary to refocus the Company and adapt to the market realities in the energy sector while pursuing opportunities to improve our growth prospects.

There is a path to organic revenue growth across the entire Company. To that end, we are investing to further improve our sales organization and find ways to promote more of our technologies and services to customers. We believe investment is needed in the midstream market, especially North America, to efficiently and safely bring oil and gas to market.

Our internal investments to build a robust Asset Integrity Management program will help us use our scale to more effectively provide corrosion engineering and cathodic protection products and services to our customers. There is no substitute for superior execution. We are committed to creating a continuous improvement culture company-wide, driven at the employee level in a supportive team environment.

We've begun to examine key processes to eliminate wasted time and reduce accidents, errors, and defects. This cultural change goes beyond our manufacturing facilities, which have been using continuous improvement principles for years, but are now in areas such as cost estimating, project management, crew utilization, cash collections, and effectively delivering shared services. We can't be successful long-term without continuously improving all we do internally as an organization, and more importantly, externally with our customers.

With the addition of Underground Solutions, we have a stronger and more diverse portfolio of solutions to take advantage of a growing pressure pipe market in North America. There are other inorganic opportunities to explore, which add new technologies and services to enhance growth.

We will be disciplined in our M&A efforts and focus on expanding the capabilities of our current platforms. Today, we see the best opportunities in urban infrastructure and midstream oil and gas pipelines. We believe this sharper focus on serving the needs of customers and continuous improvement can lead to stable organic growth and create long-term value for our shareholders.

Let me turn the call over to David for his perspective on our first-quarter performance.
    
David Martin:    Thank you, Chuck, and good morning. The release yesterday provided details about the results for the quarter, so I intend to hit some high points and drivers of our performance, as usual.


4



So let's start with the P&L on slide 8. As Chuck said, overall, we got off to the start that we anticipated from an operating perspective, while it was certainly more challenging on the energy side of the business from one year ago. Adjusted earnings per share was $0.12 compared to the prior-year adjusted earnings per share of $0.13.

From a revenue perspective, as you can see on slide 9, our results came in as expected, given the favorable market conditions for Infrastructure Solutions. This resulted from the high-single digit revenue growth in the North American CIPP market, which accounted for approximately 75% of the $126 million in revenues, a 2.7% increase over the prior-year.

Underground Solutions contributed nearly $5 million in revenues over a six-week period since we closed the acquisition in mid-February. The revenue result for the segment would have been better if not for a slower start in the international CIPP markets, and some unfavorable comparisons relating to the -- completing the remaining backlog in the restructured operations in the international markets in 2015, and a modest $2 million negative currency translation impact in the quarter.

Revenues in the West Coast downstream market for Energy Services grew mid-teens, primarily reflecting a step-up in turnaround activities in early 2016. The mix between downstream and upstream activity is about 85% to 15% from the 60/40 split in the past. Unfortunately, the downsizing of our Central California operations more than offset the downstream revenue growth. The result was 11% decline in revenues to $76 million.

Revenues declined nearly 10% for Corrosion Protection to $92 million, which primarily reflects the current state of the energy markets in Canada, compared to a much stronger market in the first quarter of 2015. The results also reflect the sale of Bayou Canada, which generated about $9 million in revenues in Q1 of 2015.

Our revenues in the remaining Canadian operations were down over $10 million year-over-year. Our revenues in the US increased in the midstream market, and that is an encouraging sign for the business. In addition, pipe coating volume at our new Louisiana facility came in better than expected, reflecting the acceleration of one project that was originally slated for the second quarter.

Consolidated adjusted non-GAAP gross profit declined 6% to $56 million, while gross margins contracted 20 basis points to 18.9%. The modest margin compression was primarily a result of the upstream market factors, most notably our Canadian results.

Now let me add some color on the gross margin performance for each segment, which is summarized on slide 10. Adjusted gross margins for Infrastructure Solutions expanded 120 basis points to 24.6%. Revenue growth across nearly all regions in the North American CIPP market and our project execution also improved, leading to a 20% increase in gross profit and a 300 basis point increase in gross margins in that business.

People always ask about our weather as a factor, and we really didn't see a marked change in the number of production days affected by weather as compared to the first quarter last year. Underground Solutions contributed $2.6 million of adjusted gross profit, and gross margins were in excess of 40%, as expected.

As with the revenue performance, these two factors primarily drove the improved gross profit and margin performance in the quarter, while our results were lower compared to last year in the international CIPP market. We also had a nice contribution from the Tyfo Fibrwrap product in the first quarter of 2015 related to material sales related to the large industrial pressure pipe job that we executed during the year.

Now, turning to Corrosion Protection. Gross margins for this segment declined 190 basis points to 18.6%. The decline in margins was principally the result of the pullback in the Canadian market, as we discussed earlier. To put this in better context, gross profit dropped $3.6 million in the first quarter as compared to last year.

5




The Canadian coating venture we sold in February 2016 contributed $2.2 million more in gross profit in the first quarter of 2015. More importantly, gross profit in the remaining Canadian operations declined $3.9 million year-over-year on lower revenue. We saw improved profitability in the rest of Corrosion Protection.

We also saw improved margins in the US, traditionally our largest and highly profitable market for upstream and midstream activity. Our focus will continue to be on improving execution as we move into the prime season for activities within Corrosion Protection. And we are moving in the right direction.

Finally, Energy Services' gross margins declined 160 basis points to 9.9% for two reasons. First, upstream gross margins were down significantly as we absorbed additional costs to close out maintenance and lump sum project activity in Central California. Second, we had higher than anticipated costs to staff up a couple of downstream turnaround projects in the quarter, which were not recoverable from customers.

Now, there were two other nearly offsetting items which impacted our financial results in the first quarter. First, we recorded a non-cash expense of $1.1 million in other expense for realized currency losses related to the reevaluation of the dollar-denominated deposits in certain international locations.

Second, we were able to release $1.9 million in tax valuation allowances as a result of judgmental changes in the realization of future tax benefits from our US operations. Because the tax valuation allowance reduction occurred in our seasonally low quarter for pre-tax income, the adjusted effective tax rate was negative 34%. Based on our current projections, I expect our tax rate to return to our normalized rate of around 30% in the remaining quarters of 2016 and for the full year.

Now let me provide an update to the restructuring initiative underway, as you can see on slide 11. We completed the vast majority of the 2016 restructuring actions in the first quarter, primarily with the downsizing in Central California through our office closures and headcount reductions. We recorded a $9.7 million pre-tax charge in the first quarter, which was above our initial range of $7 million to $9 million.

We now expect total pre-tax charges to be in the range of $11 million to $13 million, most of which will be cash charges for employee severance and other employee benefits. The reason for the larger charge is the longer time required to wind down our operations in Central California, along with the identification of additional headcount reductions within Corrosion Protection in various locations.

We realized an estimated $3.5 million in cost reductions in the first quarter, which is in line with our expectations to reduce costs by $15 million to $16 million overall, slightly ahead of our original expectation of $15 million in cost reductions. Keep in mind that a sizable portion of our reductions are reflected in cost of sales, as these reductions relate to billable personnel. For the first quarter, we reduced adjusted consolidated operating expenses by approximately $2 million out of a total of $46.6 million, excluding $1.4 million in operating expenses from Underground Solutions.

Now let's review our cash flow performance on slide 12. In the first quarter of 2016, cash flow from operating activities used $2 million of cash, as compared to a use of $12 million in the prior-year quarter. This result includes heavy amounts we spent on restructuring activities in the first quarter of 2016. Outside of that, the use of cash in the first quarter is typical, given the seasonality of the business.

While I'm happy that we are able to see continued improvements in working capital management related to receivables in the first quarter, we continue to focus on improving our cash conversion efficiency, as DSOs have declined 10 days from last year at this time to

6



84 days. In this calculation, I have excluded certain prepayments on the large coating and insulation contract in Louisiana, which would reduce DSOs down by another 15 days.

Our cash balance was a healthy $128 million compared to $136 million at the end of Q1 2015. We used the $212 million record cash position at the end of 2015 to fund about $60 million of the Underground Solutions acquisition, with the remainder coming from our revolving line of credit. We also used over $16 million to buy back approximately 911,000 shares of common stock through our open market repurchase programs and for our management equity programs.

We completed the recent $20 million stock repurchase authorization in April, and we are now executing the new $20 million program approved by the Board in March of this year. Additional uses of cash in the quarter included capital expenditures of $10 million, which is higher than normal for this time of year. We spent over $5 million in the first quarter of 2016 on the buildout of our new coating plant in Louisiana in preparation for the Appomattox project.

I still expect CapEx for 2016 to be approximately $35 million for the full year, reflective of the capital needed to complete the plant in Louisiana and other growth capital needed in Infrastructure Solutions. We made $4.4 million in debt repayments in the quarter per the terms of our current credit agreement. We have scheduled debt repayments of nearly $18 million for 2016, which remains unchanged from previous expectations.

Now let me conclude. We had a decent start to the year in both terms of our financial results as well as our visibility as to how the rest of the year will shape up for us. As we did in 2015, we will take advantage of those areas of strength to largely offset the challenges we face in the energy markets. We expect to substantially complete the restructuring in the second quarter, and realize the cost reductions that will allow us to lower our risk profile and compete more effectively in the energy markets.

As we look into the future, we are excited about -- to add Underground Solutions to our portfolio for the pressure pipe market. We believe the mainstream market can continue to grow, which is why we are investing to improve our capabilities in that segment. I fully expect to maintain and improve our strong balance sheet, and generate solid cash flows in 2016 to allow us to continue to invest and to return cash to stockholders.

That concludes our prepared remarks. I will now turn the call over to the operator to begin the Q&A session.

Operator:    Thank you. Ladies and gentlemen, if you have a question at this time, please press the star then the number one key on your touch tone telephone. If your question has been answered or you wish to remove yourself from the queue, please press the pound key.

Thank you. And our question comes from the line of Eric Stine with Craig-Hallum. Your line is open. Please go ahead.

Eric Stine:    I wondered if we can just start with Underground Solutions? It looks like -- and I know it was just six weeks in the quarter, but gross margins well over 50% and operating margins in the high 20s. Maybe talk about -- I know your commentary is talking about 40%-plus gross margins, but maybe some clarity into what happened here in the quarter and whether this type of strength is sustainable going forward?

David Martin:    Certainly, they'll have a -- good morning, Eric, by the way. Yes, certainly, they had a solid quarter in the first six weeks. They had some nice closeouts to some jobs that helped boost their profitability a little bit in the quarter itself. But I continue to expect that they can see the margins in excess of 40%. You can have some ups and downs in there, but the market is pretty competitive and they will see similar results in the future.


7



Charles Gordon:    Yes, I think, Eric, the expectation should be, for the business going forward, that gross margins in operating income would be closer to the 40% and 10% range, respectively. That's the expectation.

Eric Stine:    Okay. Okay, that helps. Maybe then just turning to -- and I know you are reiterating the guidance, but it sounds like you've got more confidence in that guidance. But maybe just some commentary on the type of split that you expect? Or maybe on what second-quarter might look like versus last year, just to give us a good idea, get us in a decent spot?

Charles Gordon:    Well, again, we guide for the -- what we've done is provided an expectation for what we think the full year will be. Certainly, the second and third quarters are typically good quarters for Infrastructure Solutions on the construction side of the business. We have -- we are challenged sort of across-the-board in the energy market in Canada. We were very pleased with the performance of our midstream business in Q1. We actually -- bookings were up about 10%.

But we are going to be more weighted towards the second-half of the year. There's no question that the Appomattox project, coming in at the end of Q3 and beginning of Q4, is going to have a big impact on the year. And it's going to create a set -- more of a back-end loaded earnings in 2016 than we experienced in 2015.

Eric Stine:    Okay. And just sticking with Appomattox, that start date and just to clarify, I believe is that that really is not dependent on you. You've got -- I mean, you are pretty much positioned for that. You've got a few things you're doing right now, but that's really more dependent on the project schedule than your time line?

Charles Gordon:    No. So just to review, I think maybe some of the things that we talked about in Q1. We have -- we can produce pipe at our own rate. We have it. There is an endpoint when all the pipe has to be coated and insulated in 2018, but we can produce on our own schedule as long as we meet that time-frame.

Eric Stine:    Okay.

Charles Gordon:    The risks in the project are typically what all of these have when you start up a new plant and a new technology, and those are really where the risks are. The project's schedule is -- isn't really -- the overall Appomattox project schedule really isn't going to impact us, based on what we -- based on the current schedule.

The challenge is always starting up a new plant and starting up a new technology. We feel really good about where we're at. We're excited about it. I've got to tell you, the team down there has done a fantastic job so far. But it's a new plant, it's a new technology, and there's always risk in that.

Eric Stine:    Okay, got it. That's it for me. Thanks a lot.

Charles Gordon:    Thanks, Eric.

Operator:    Thank you. And our next question comes from the line of Craig Bibb with CJS Securities. Your line is open. Please go ahead.

Craig Bibb:    It seems like since Flint, the interest in water systems and politicians' sensitivity to doing something about them has increased. Do you guys have all the pieces you need to capitalize on that? Or is there more Underground Solutions coming?

Charles Gordon:    We would like to continue to build our portfolio. I want to be clear -- there was a lot of press, particularly around the incident in Flint, and rightly so. That incident, I think what that does for the market is increases overall awareness of the problem.


8



I don't think it's going to create a sudden big increase in the overall market demand. What we see is a steady increase in that market over a long period of time, which is why we're investing in it. We think there are some other technologies we'd like to have. We continue to look for them, we continue to develop internally, and so it will be an ongoing process. There are some things we would like to add to our portfolio.

Craig Bibb:    Okay. And it seems like your midstream pipeline business is solid, but there have been a couple of projects that were deferred or canceled. How -- new midstream pipeline business -- can you give us a sense of how the percentage of revenue or how levered you are to that?

Charles Gordon:    Sure. In our midstream business in Corrpro in particular, about 75% of the business is maintenance and monitoring-related, and the other 25% is related to new construction. In Q1, we were fortunate we weren't impacted by the Laser cancellations. And like I said, in the midstream business, really pleased with the result in Q1. The early signs are good.

Our global business was up about 10% year-over-year in terms of orders. The challenge is, is that Canada is going to be challenging. And we have a real nice business up there, a real good team. They are having a solid year, but they had a phenomenal year last year. And it will just be difficult for us to replicate that. So, I'm real pleased to say that the overall business is up nicely year-over-year.

Craig Bibb:    Okay. And then with the Asset Integrity Management business that you are rolling out, what costs are associated with that?

Charles Gordon:    We've got operating costs associated with that, that -- and investment costs that we're making. We're going to -- we'll be investing in seven figures for that program this year. And it's something that we took a hard look around the marketplace and really decided that we were best positioned, I think, to do a lot of internal development, as opposed to acquiring something. But we will have an investment that will be in the seven figures in 2016.

Craig Bibb:    Okay. And then last --

David Martin:    Just to clarify, Craig, there's a portion of that, a sizable portion of that is capital.

Craig Bibb:     Right.

Charles Gordon:    Right.

Craig Bibb:    Okay. And then last question, and you might have answered this on the first question, but could you bracket the revenues for the Shell project in Q4?

Charles Gordon:    We have not given out that information. I think we'll -- we talked a little bit about what the overall size of the project was obviously in Q4. Early in the quarter, we will be in the startup mode, but we have not given out that revenue number.

Craig Bibb:     All right. Thanks a lot.

Charles Gordon:    You're welcome. Thank you.

Operator:    Thank you. And our next question comes from the line of John Rogers with D.A. Davidson. Your line is open. Please go ahead.
    
John Rogers:    Maybe just to follow up for a second on Craig's question. In terms of the large project opportunities associated with some of the midstream work in North America, when will those be offered? Or will there be opportunities for Aegion over this year and the first part of next year? It seems like a lot of these projects are being -- are starting to move forward.


9



Charles Gordon:    Yes, certainly. We see opportunities. Certainly that's an opportunity for -- those are opportunities for Corrpro. There are also opportunities for our coating services business, and we look forward to seeing those projects move forward and come to fruition. So they are good opportunities for us.

John Rogers:    Are they significant? I mean, I assume they are nowhere near Appomattox, but I mean, are -- I'm just trying to get a sense of what you are thinking about.

Charles Gordon:    They are significant to our coating services business, but remember that coating services business is a small business in our portfolio. So, relative to the overall Aegion, certainly they have a positive impact and we're excited about it, but they are not terribly significant.

John Rogers:    Okay. So with the Appomattox in, then it would suggest that backlog starts to come down as that production ramps up later this year?

Charles Gordon:    Yes, certainly as we ramp up Appomattox backlog, you'll see backlog in Corrosion Protection be impacted. It's such a large project.

John Rogers:    Okay. And then just on the Underground Solutions for a second, I just want to make sure -- the market is good but the decline in backlog, is that significant? I mean, you guys have always been much more conservative about sort of the growth potential with that market versus, I think, some others. And --

Charles Gordon:    That's a good question. Remember last year in Q1, we had a tremendous orders quarter. We had a great quarter. And then the business -- I don't want to say it tailed off, but certainly it slowed down for the rest of the year. The last three quarters we didn't have nearly the -- especially the second half of the year, we didn't have nearly the kind of quarter that we had in Q1. What we are seeing this year, we believe, is a bid table that will be more -- a little bit flatter during the course of the year.

Our results for Q1 were down; not significantly, but they were down a little bit for North America rehab. We are having a really nice -- we had a nice April. We're having a really good start over the last week or so to May, and feel really good about the -- we feel really good about that market.

I don't think we have any issue at all to say that that -- our revenue will grow and we will be in a good backlog position at the end of the year. We feel really good about the market. It's just so we did not -- we had such a strong Q1 last year, and it was a bit of an anomaly, but we'll see the rest of this year, I think, more than make up for the fact that Q1 was down slightly versus that record quarter last year.

John Rogers:    Okay. Thanks, Chuck, David. Appreciate the color you gave us.
    
Operator:    Thank you. And our next question comes from the line of Noelle Dilts with Stifel.
    Your line is open. Please go ahead.

Noelle Dilts:    I was hoping you could just give us a little bit more detail on what you are seeing at Corrpro in the quarter and also UPS. And then just speak a little bit to how you are thinking about those businesses playing out through the remainder of the year.
 
Charles Gordon:    Sure. So we were real pleased with Corrpro for the year. Again, we talked about the orders in our midstream market were up about 10% year-over-year. Real pleased with that result. And it is a challenging environment in Canada. What I would say for UPS and for our coatings business, let's take out -- just excluding Appomattox for a minute. Remember that in Q1 of last year, we had backlog that was still left over from the low oil prices. And we had a pretty nice Q1, and then we ran out of backlog.

And I think what you are going to see this year is that the market is still tough for UPS and coating services, but the big year-over-year decline will be in Q1 as we go forward and the

10



rest of the year, it's a tough year, but it was a tough year last year during the final three quarters of the year. And what we've done with UPS in particular is that team has worked hard to diversify outside of oil and gas. And like I mentioned with the municipal project they are doing, we are starting to see some results from that effort.

But the oil and gas market for UPS and for coating services is challenging. Continues to be challenging. But remember, last year we did have that nice first quarter and that was really the remnants of the backlog from the lower oil and gas prices that we were able to execute. The last three quarters of the year, we had much lower results for those businesses. So on a year-over-year basis, I think you'll see the rest of the year be pretty stable versus what we saw last year.

Noelle Dilts:    Okay. And then when you guys first announced Underground Solutions, you talked a little bit about some of the R&D efforts that you are working on in terms of working on some small and medium diameter pressure pipes. I guess I'm just curious, are you -- when do you think you'll have some visibility into how that -- those R&D efforts are progressing? And is this something that could help in 2017? Or are we looking further down the road?

Charles Gordon:    I think that we're actually doing -- it's a great question. We're doing field tests this month and next month with a couple of different products here in Chesterfield. We think we'll have some sales of one of the products in 2017. They won't be significant to the overall sales of Insituform, though, or of Aegion. But certainly, I think those -- both the products that we are working on will have a significant impact in the future, and we're excited about it.

Remember the sales process. Once we get something commercialized, we have to take it to the engineering community. We have to sell the engineers on it, and then we have to find the right product with the right projects that the products apply to. And that all takes time. It's a process that where the market introduction takes time, the municipal market is a pretty conservative market. But we certainly would expect some sales in 2017, but are really excited about -- or 2016, I'm sorry -- but are really excited about the prospects going into 2017 and 2018 for those products.

Noelle Dilts:    All right. Great. Thanks.

Charles Gordon:    You're welcome.

Operator:    Thank you. And our next question comes from the line of David Rose with Wedbush Securities. Your line is open. Please go ahead.

Charles Gordon:    Morning, David. David, we can't hear you.

Operator:    And I'm showing no further questions at this time. I would like to turn the conference back over to Mr. Chuck Gordon for any closing remarks.

Charles Gordon:    Thank you for joining us this morning. The first quarter came in as we expected, but more importantly, our assessment for the full year has not changed. Infrastructure Solutions contributed, contributions from Underground Solutions, downstream portion of Energy Services, and our cost reduction initiative, give us the chance to largely offset the downsizing we have made in the upstream market and a tougher upstream market overall in 2016.

The first half of the year will be difficult for us, but I expect to see improved second-half performances across the business, and with the contribution from the Appomattox project. With a focus on strong execution, adding value to our customers, as well as investing for future growth, we will be successful in 2016 and beyond.

Again, thank you for joining us this morning.

11



Operator:    Ladies and gentlemen, thank you for participating in today's conference. This does conclude today's program. You may all disconnect. Everyone have a great day.
    
        
END



12
GRAPHIC 4 aegionlogoa17.jpg begin 644 aegionlogoa17.jpg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