XML 30 R40.htm IDEA: XBRL DOCUMENT v2.4.0.6
Commitments and Contingencies (Details 2) (USD $)
In Millions, unless otherwise specified
1 Months Ended 3 Months Ended 3 Months Ended 12 Months Ended 3 Months Ended 1 Months Ended 3 Months Ended 1 Months Ended 3 Months Ended
Jun. 30, 2006
Gas
site
Mar. 31, 2013
Gas
Mar. 31, 2013
Permits
Electric
Mar. 31, 2013
SO2 Emissions
Electric
T
Mar. 31, 2013
Clean Air Interstate Rule
Electric
MW
state
Mar. 31, 2013
NAAQS
Electric
ppb
Jan. 06, 2010
NAAQS
Electric
Minimum
ppb
Jan. 06, 2010
NAAQS
Electric
Maximum
ppb
Mar. 31, 2013
Power Plant Mercury And Air Toxics Rule
Electric
phase
Mar. 31, 2013
Power Plant Mercury And Air Toxics Rule
Electric
Minimum
Mar. 31, 2013
Power Plant Mercury And Air Toxics Rule
Electric
Maximum
Mar. 31, 2013
Surface Impoundments
Electric
option
Dec. 31, 2012
Surface Impoundments
Iatan
Electric
Dec. 31, 2012
Surface Impoundments
Plum point
Electric
Mar. 31, 2013
Green House Gases
Mar. 31, 2013
Green House Gases
Minimum
Sep. 22, 2009
Green House Gases
Electric
t
Nov. 30, 2010
Renewable Energy
Electric
Mar. 31, 2013
Renewable Energy
Electric
certificate
MWh
customer
Mar. 31, 2011
National Emission Standards for Hazardous Air Pollutants
Electric
Mar. 31, 2013
Compliance Plan
Electric
Environmental Laws And Regulations                                          
Number of years site operating permits are valid     5 years                                    
Expected cost of adding Carbon injection system                   $ 112.0 $ 130.0                    
Initial construction costs                                         18.7
Generating facility costs incurred through the period excluding AFUDC                                         48.9
Amount of SO2 emission permitted under each SO2 allowance per affected unit (in tons)       1                                  
Minimum capacity of power plant called to reduce emission levels of SO2 and NOx (in megawatts)         25                                
Number of states in which fossil-fueled power plants are required to reduce emission levels of SO2 and NOx as per CAIR         28                                
Ratio of S02 allowances that must be utilized         2                                
Percentage of SO2 reduction from 2005 levels by 2014, required by the proposed CATR         73.00%                                
Percentage of NOx reduction from 2005 levels by 2014, required by the proposed CSAPR         54.00%                                
Proposed primary standard             60 70                          
Normal reconsideration period for ozone standards           5 years                              
2008 standard at which states will continue to identify and designate all non-attainment areas           75                              
Phase-in period for proposed standards                                       3 years  
Number of phases expected to reduce nationwide mercury emissions                 2                        
Minimum emission threshold of CO2e from power generating and certain other facilities requires to report Greenhouse Gases (in metric tons)                                 25,000        
Limit of CO2 emissions                             1,000            
Minimum threshold percentage of emission for coal-fired power plant                               50.00%          
Average period required for emission of CO2                             30 years            
Percentage of ownership in a coal ash impoundment at a generating facility                         12.00% 7.52%              
Number of options in the EPA proposal                       2                  
Potential cost for construction of new landfill and conversion of existing ash handling from wet to dry system(s)                       15                  
Minimum percentage of energy purchased through long-term Purchased Power Agreements                                     15.00%    
Amount of renewable energy certificates generated each year                                     900,000    
Represents the megawatt-hour of renewable energy per renewable energy certificate (REC)                                     1    
Minimum percentage of Missouri retail sales required to generate or purchase electricity by 2012                                     2.00%    
Minimum percentage of Missouri retail sales required to generate or purchase electricity by 2021                                     15.00%    
Number of customers who have challenged exemption from solar requirement                                     2    
Percentage of Missouri retail sales required to generate or purchase solar energy                                     2.00%    
Percentage of Kansas retail customer peak capacity required to be sourced from renewable energy by 2012                                   10.00%      
Percentage of Kansas retail customer peak capacity required to be sourced from renewable energy by 2016                                   15.00%      
Percentage of Kansas retail customer peak capacity required to be sourced from renewable energy by 2020                                   20.00%      
Number of former manufactured plant sites with potential future remediation 2                                        
Remediation costs   $ 0.2                                      
Period for compliance                                       4 years