XML 44 R61.htm IDEA: XBRL DOCUMENT v2.4.1.9
Commitments and Contingencies (Environmental Matters) (Details) (Environmental Litigation [Member])
12 Months Ended
Dec. 26, 2014
counterparty
mi
Environmental Litigation [Member]
 
Loss Contingencies [Line Items]  
Number of miles pertaining to Passaic River tidal reach required to be studied by EPA 17csx_NumberofmilespertainingtoPassaicRivertidalreachrequiredtobestudiedbyEPA
/ us-gaap_LitigationCaseAxis
= csx_EnvironmentalLitigationMember
Number Of Potentially Responsible Parties In Connection With Environmental Liabilities For Operations Conducted Near Passaic River 60csx_NumberOfPotentiallyResponsiblePartiesInConnectionWithEnvironmentalLiabilitiesForOperationsConductedNearPassaicRiver
/ us-gaap_LitigationCaseAxis
= csx_EnvironmentalLitigationMember