-----BEGIN PRIVACY-ENHANCED MESSAGE----- Proc-Type: 2001,MIC-CLEAR Originator-Name: webmaster@www.sec.gov Originator-Key-Asymmetric: MFgwCgYEVQgBAQICAf8DSgAwRwJAW2sNKK9AVtBzYZmr6aGjlWyK3XmZv3dTINen TWSM7vrzLADbmYQaionwg5sDW3P6oaM5D3tdezXMm7z1T+B+twIDAQAB MIC-Info: RSA-MD5,RSA, HvVXQQmQ1GQu7vRoS286mWeJxf1v9B9opjBLfQ8pNdENs07ALPs7oGADVuM2OjI/ aStkYimgpsMHbd6xr8L12A== 0001031296-08-000181.txt : 20080731 0001031296-08-000181.hdr.sgml : 20080731 20080731172612 ACCESSION NUMBER: 0001031296-08-000181 CONFORMED SUBMISSION TYPE: 8-K PUBLIC DOCUMENT COUNT: 4 CONFORMED PERIOD OF REPORT: 20080731 ITEM INFORMATION: Regulation FD Disclosure ITEM INFORMATION: Financial Statements and Exhibits FILED AS OF DATE: 20080731 DATE AS OF CHANGE: 20080731 FILER: COMPANY DATA: COMPANY CONFORMED NAME: TOLEDO EDISON CO CENTRAL INDEX KEY: 0000352049 STANDARD INDUSTRIAL CLASSIFICATION: ELECTRIC SERVICES [4911] IRS NUMBER: 344375005 STATE OF INCORPORATION: OH FISCAL YEAR END: 1231 FILING VALUES: FORM TYPE: 8-K SEC ACT: 1934 Act SEC FILE NUMBER: 001-03583 FILM NUMBER: 08982745 BUSINESS ADDRESS: STREET 1: 76 SOUTH MAIN STREET STREET 2: C/O FIRSTENERGY CORP. CITY: AKRON STATE: OH ZIP: 44308-1890 BUSINESS PHONE: 330-761-7837 MAIL ADDRESS: STREET 1: 76 SOUTH MAIN STREET STREET 2: C/O FIRSTENERGY CORP. CITY: AKRON STATE: OH ZIP: 44308-1890 FILER: COMPANY DATA: COMPANY CONFORMED NAME: OHIO EDISON CO CENTRAL INDEX KEY: 0000073960 STANDARD INDUSTRIAL CLASSIFICATION: ELECTRIC SERVICES [4911] IRS NUMBER: 340437786 STATE OF INCORPORATION: OH FISCAL YEAR END: 1231 FILING VALUES: FORM TYPE: 8-K SEC ACT: 1934 Act SEC FILE NUMBER: 001-02578 FILM NUMBER: 08982747 BUSINESS ADDRESS: STREET 1: 76 SOUTH MAIN STREET STREET 2: C/O FIRSTENERGY CORP. CITY: AKRON STATE: OH ZIP: 44308-1890 BUSINESS PHONE: 330-761-7837 MAIL ADDRESS: STREET 1: 76 SOUTH MAIN STREET STREET 2: C/O FIRSTENERGY CORP. CITY: AKRON STATE: OH ZIP: 44308-1890 FILER: COMPANY DATA: COMPANY CONFORMED NAME: CLEVELAND ELECTRIC ILLUMINATING CO CENTRAL INDEX KEY: 0000020947 STANDARD INDUSTRIAL CLASSIFICATION: ELECTRIC SERVICES [4911] IRS NUMBER: 340150020 STATE OF INCORPORATION: OH FISCAL YEAR END: 1231 FILING VALUES: FORM TYPE: 8-K SEC ACT: 1934 Act SEC FILE NUMBER: 001-02323 FILM NUMBER: 08982746 BUSINESS ADDRESS: STREET 1: 76 SOUTH MAIN STREET STREET 2: C/O FIRSTENERGY CORP. CITY: AKRON STATE: OH ZIP: 44308-1890 BUSINESS PHONE: 330-761-7837 MAIL ADDRESS: STREET 1: 76 SOUTH MAIN STREET STREET 2: C/O FIRSTENERGY CORP. CITY: AKRON STATE: OH ZIP: 44308-1890 FILER: COMPANY DATA: COMPANY CONFORMED NAME: FIRSTENERGY CORP CENTRAL INDEX KEY: 0001031296 STANDARD INDUSTRIAL CLASSIFICATION: ELECTRIC SERVICES [4911] IRS NUMBER: 341843785 STATE OF INCORPORATION: OH FISCAL YEAR END: 1231 FILING VALUES: FORM TYPE: 8-K SEC ACT: 1934 Act SEC FILE NUMBER: 333-21011 FILM NUMBER: 08982743 BUSINESS ADDRESS: STREET 1: 76 SOUTH MAIN ST CITY: AKRON STATE: OH ZIP: 44308-1890 BUSINESS PHONE: 330-761-7837 MAIL ADDRESS: STREET 1: 76 SOUTH MAIN ST CITY: AKRON STATE: OH ZIP: 44308-1890 8-K 1 main8_k.htm FORM 8-K DATED JULY 31, 2008 Unassociated Document
 


 

UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D. C. 20549

FORM 8-K

CURRENT REPORT

PURSUANT TO SECTION 13 OR 15(d) OF THE
SECURITIES EXCHANGE ACT OF 1934

Date of Report (Date of earliest event reported) July 31, 2008


Commission
 
Registrant; State of Incorporation;
 
I.R.S. Employer
File Number
 
Address; and Telephone Number
 
Identification No.
         
333-21011
 
FIRSTENERGY CORP.
 
34-1843785
   
(An Ohio Corporation)
   
   
76 South Main Street
   
   
Akron, OH  44308
   
   
Telephone (800)736-3402
   
         
1-2578
 
OHIO EDISON COMPANY
 
34-0437786
   
(An Ohio Corporation)
   
   
c/o FirstEnergy Corp.
   
   
76 South Main Street
   
   
Akron, OH  44308
   
   
Telephone (800)736-3402
   
         
1-2323
 
THE CLEVELAND ELECTRIC ILLUMINATING COMPANY
 
34-0150020
   
(An Ohio Corporation)
   
   
c/o FirstEnergy Corp.
   
   
76 South Main Street
   
   
Akron, OH  44308
   
   
Telephone (800)736-3402
   
         
1-3583
 
THE TOLEDO EDISON COMPANY
 
34-4375005
   
(An Ohio Corporation)
   
   
c/o FirstEnergy Corp.
   
   
76 South Main Street
   
   
Akron, OH  44308
   
   
Telephone (800)736-3402
   
         

















Check the appropriate box below if the Form 8-K filing is intended to simultaneously satisfy the filing obligation of the registrant under any of the following provisions (see General Instruction A.2.):

[ ] Written communications pursuant to Rule 425 under the Securities Act (17 CFR 230.425)
[ ] Soliciting material pursuant to Rule 14a-12 under the Exchange Act (17 CFR 240.14a-12)
[ ] Pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act (17 CFR 240.14d-2(b))
[ ] Pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act (17 CFR 240.13e-4(c))

 
 

 


Item 7.01 Regulation FD Disclosure.


 Item 9.01 Financial Statements and Exhibits.

(d) Exhibits.

Exhibit No.
Description
   
99.1
Press Release issued by FirstEnergy Corp., dated July 31, 2008
 
99.2
Letter to the Investment Community, dated July 31, 2008
 






Forward-Looking Statements: This Form 8-K includes forward-looking statements based on information currently available to management. Such statements are subject to certain risks and uncertainties. These statements include declarations regarding management’s intents, beliefs and current expectations. These statements typically contain, but are not limited to, the terms “anticipate,” “potential,” “expect,” “believe,” “estimate” and similar words. Forward-looking statements involve estimates, assumptions, known and unknown risks, uncertainties and other factors that may cause actual results, performance or achievements to be materially different from any future results, performance or achievement expressed or implied by such forward-looking statements. Actual results may differ materially due to the speed and nature of increased competition in the electric utility industry and legislative and regulatory changes affecting how generation rates will be determined following the expiration of existing rate plans in Ohio and Pennsylvania, the impact of the PUCO’s rulemaking process on the Ohio Companies’ ESP and MRO filings, economic or weather conditions affecting future sales and margins, changes in markets for energy services, changing energy and commodity market prices and availability, replacement power costs being higher than anticipated or inadequately hedged, the continued ability of FirstEnergy’s regulated utilities to collect transition and other charges or to recover increased transmission costs, maintenance costs being higher than anticipated, other legislative and regulatory changes, revised environmental requirements, including possible GHG emission regulations, the impact of the U.S. Court of Appeals’ July 11, 2008 decision to vacate the CAIR rules and the scope of any laws, rules or regulations that may ultimately take their place, the uncertainty of the timing and amounts of the capital expenditures needed to, among other things, implement the Air Quality Compliance Plan (including that such amounts could be higher than anticipated) or levels of emission reductions related to the Consent Decree resolving the New Source Review litigation or other potential regulatory initiatives, adverse regulatory or legal decisions and outcomes (including, but not limited to, the revocation of necessary licenses or operating permits and oversight) by the NRC (including, but not limited to, the Demand for Information issued to FENOC on May 14, 2007), the timing and outcome of various proceedings before the PUCO (including, but not limited to, the distribution rate cases and the generation supply plan filing for the Ohio Companies and the successful resolution of the issues remanded to the PUCO by the Ohio Supreme Court regarding the RSP and RCP, including the deferral of fuel costs) and Met-Ed’s and Penelec’s transmission service charge filings with the PPUC as well as the resolution of the Petitions for Review filed with the Commonwealth Court of Pennsylvania with respect to the transition rate plan for Met-Ed and Penelec, the continuing availability of generating units and their ability to operate at, or near full capacity, the changing market conditions that could affect the value of assets held in the registrants’ nuclear decommissioning trusts, pension trusts and other trust funds, the ability to comply with applicable state and federal reliability standards, the ability to accomplish or realize anticipated benefits from strategic goals (including employee workforce initiatives), the ability to improve electric commodity margins and to experience growth in the distribution business, the ability to access the public securities and other capital markets and the cost of such capital, the risks and other factors discussed from time to time in the registrants’ SEC filings, and other similar factors. The foregoing review of factors should not be construed as exhaustive. New factors emerge from time to time, and it is not possible to predict all such factors, nor assess the impact of any such factor on the registrants’ business or the extent to which any factor, or combination of factors, may cause results to differ materially from those contained in any forward-looking statements. Also, a security rating is not a recommendation to buy, sell or hold securities, and it may be subject to revision or withdrawal at any time and each such rating should be evaluated independently of any other rating. The registrants expressly disclaim any current intention to update any forward-looking statements contained herein as a result of new information, future events, or otherwise.


 
2

 


SIGNATURE

Pursuant to the requirements of the Securities Exchange Act of 1934, each Registrant has duly caused this report to be signed on its behalf by the undersigned thereunto duly authorized.



July 31, 2008


 
 FIRSTENERGY CORP.
 
 Registrant
   
 
OHIO EDISON COMPANY
 
 Registrant
   
 
THE CLEVELAND ELECTRIC
 
ILLUMINATING COMPANY
 
 Registrant
   
 
THE TOLEDO EDISON COMPANY
 
 Registrant
     
     
  
  
  
 
By:  
 
Harvey L. Wagner
Vice President, Controller and
Chief Accounting Officer
 
 

 
3

 

EX-99.1 2 ex99_1.htm EXHIBIT 99.1 - PRESS RELEASE ISSUED BY FIRSTENERGY CORP., DATED JULY 31, 2008 ex99_1.htm
 
EXHIBIT 99.1

 
FirstEnergy Corp.
 
For Release:  Upon Receipt
76 South Main Street
   
Akron, Ohio 44308
   
www.firstenergycorp.com
   
     
News Media Contact:
 
Investor Relations Contact:
Ellen Raines
 
Ron Seeholzer
(330) 384-5808
 
(330) 384-5415
     

FIRSTENERGY’S OHIO UTILITIES FILE A
COMPREHENSIVE ELECTRIC SECURITY PLAN
Supports Economic Development and Energy Efficiency; Limits
Customer Price Increases to About 5 Percent Annually

AKRON, Ohio – Ohio Edison Company (Ohio Edison), The Cleveland Electric Illuminating Company (CEI) and The Toledo Edison Company (Toledo Edison), electric utility companies of FirstEnergy Corp. (NYSE: FE), today filed a comprehensive Electric Security Plan (ESP) with the Public Utilities Commission of Ohio (PUCO).  The filing, which is required under Amended Substitute Senate Bill 221 (Am. Sub. SB 221), would phase in generation rates over a three-year period and incorporate the companies’ distribution rate case that was filed with the PUCO in June 2007.

Under the plan, total customer rates – including generation, transmission and distribution – would increase an average of 5.3 percent in 2009, 4 percent in 2010 and 6 percent in 2011.  Of the 2009 increase, approximately 3.2 percent is related to the companies’ pending distribution rate case.  If approved, the ESP would represent the first increase in base rates since 1990 for Ohio Edison and 1996 for CEI and Toledo Edison.

Although the percentage change in rates will vary depending on usage, the impact on a typical residential monthly bill from Ohio Edison based on 750 kilowatt-hours would be a decrease of $1.28 in 2009, followed by an increase of $3.06 in 2010 and an increase of $3.67 in 2011.  For CEI, the decrease would be $0.10 in 2009, then an increase of $3.45 in 2010 and $1.29 in 2011.  For Toledo Edison, the decrease would be $0.16 in 2009, then an increase of $3.06 in 2010 and $3.30 in 2011.

 
 

 


“We are pleased to offer a plan that protects customers from the kind of rate shock experienced in other states while providing for appropriate investments in system reliability,” said Anthony J. Alexander, president and chief executive officer of FirstEnergy.  “At the same time, our company will provide up to $50 million to support energy efficiency, demand reduction and economic development and job retention programs under the plan.”

Proposed rates reflect the end of transition cost recovery for all three companies, including CEI, which was scheduled to continue collecting regulatory transition costs through 2010.

“Considering our costs to produce and deliver electricity have increased dramatically since our last base rate cases were decided more than a dozen years ago, we’ve designed a plan that provides for modest increases in electricity prices over the next three years,” said Mr. Alexander.

Other components of the comprehensive ESP include:
Generation
·  
A three-year standard service generation offer for customers who choose to receive generation service from their local electric company.  The increase in base generation rates will be reduced by at least 10 percent – an amount that will be recovered over a period of up to 10 years to reduce the impact on customers.

Customer Generation Rates
Cents per kilowatt-hour (kWh)
 
 
 Base                                 
 Generation  Rate
 
Generation Deferral
  Customer
  Generation Rate
  Cents
  per kWh
  Percentage
  Decrease
 2008
 6.8
  N/A
  N/A
  6.8
 2009
 7.5
  (0.75)
  (10%)
  6.75
 2010
 8.0
  (0.85)
  (10.6%)
  7.15
 2011
 8.5
  (0.95)
  (11.2%)
  7.55
 
 
 
2


 
·  
Individual customers – or a legislative authority that formed, or is forming, a government aggregation group on behalf of all of its customers – will have the option to waive standby charges if they choose an alternative supplier.
o  
In exchange, these customers would pay market prices for generation if they return to the utility for generation service during the ESP period.

Distribution
·  
Resolution of the pending distribution case – with a commitment to keep base rates in place through 2013.
·  
A commitment to invest at least $1 billion in capital improvements in the companies’ energy delivery systems through 2013.

Transmission
·  
Continued recovery of transmission charges from the Midwest Independent Transmission System Operator (MISO) through a rider that would be adjusted annually to reflect actual costs incurred by the utility companies to serve customers.

Support for Energy Efficiency, Jobs and Technology
·  
Financial support for new programs to enhance efficiency and economic development – funding that would be provided by the company but not recovered through customer rates.  This includes:
o  
Up to $25 million for energy-efficiency programs through 2013.
o  
Up to $25 million for economic development and job retention programs through 2013.
·  
An Advanced Metering Infrastructure pilot program to support deployment of technologies that allow for time-of-day pricing and other demand-response and energy-efficiency programs.
·  
A commitment to undertake a comprehensive study of the energy delivery system, including smart grid technologies and other enhancements.

 
3

 


Other Key Features
·  
An option for the PUCO to approve a favorably priced short-term ESP that would allow more time to consider the longer-term ESP or to conduct a competitive bid, if needed.
·  
An option for the PUCO to move to market-based generation pricing in 2011, if the market would provide a more favorable generation price than the ESP.

While the companies believe the ESP would be more favorable for customers overall, they also filed a Market Rate Offer (MRO) that outlines a competitive bidding process for providing retail generation service to customers if the ESP is not implemented.   The bidding would use a “slice-of-system” approach, combining all three companies’ load and dividing total customer usage into portions, called tranches, each representing approximately 100 megawatts.  An independent manager would conduct the bidding process to ensure that it is open, fair and transparent.

Additional information about the ESP and MRO is available in a Letter to the Investment Community, posted on FirstEnergy’s Web site, www.firstenergycorp.com/ir.

FirstEnergy is a diversified energy company headquartered in Akron, Ohio.  Its subsidiaries and affiliates are involved in the generation, transmission and distribution of electricity, as well as energy management and other energy-related services.  Its seven electric utility operating companies comprise the nation’s fifth largest investor-owned electric system, based on 4.5 million customers served, within a 36,100-square-mile area of Ohio, Pennsylvania and New Jersey.

 
4

 


Forward-Looking Statements:  This news release includes forward-looking statements based on information currently available to management. Such statements are subject to certain risks and uncertainties. These statements include declarations regarding our, or our management’s, intents, beliefs and current expectations.  These statements typically contain, but are not limited to, the terms “anticipate,” “potential,” “expect,” “believe,” “estimate” and similar words.   Forward-looking statements involve estimates, assumptions, known and unknown risks, uncertainties and other factors that may cause our actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements.  Actual results may differ materially due to the speed and nature of increased competition in the electric utility industry and legislative and regulatory changes affecting how generation rates will be determined following the expiration of existing rate plans in Ohio and Pennsylvania, the impact of the PUCO’s rulemaking process on our Ohio utility subsidiaries’ Electric Security Plan and Market Rate Offer filings, economic or weather conditions affecting future sales and margins, changes in markets for energy services, changing energy and commodity market prices and availability, replacement power costs being higher than anticipated or inadequately hedged, the continued ability of FirstEnergy’s regulated utilities to collect transition and other charges or to recover increased transmission costs, maintenance costs being higher than anticipated, other legislative and regulatory changes including revised environmental requirements and possible greenhouse gas emissions regulation, the impact of the U.S. Court of Appeals’ July 11, 2008 decision to vacate the CAIR rules and the scope of any laws, rules or regulations that may ultimately take their place, the uncertainty of the timing and amounts of the capital expenditures needed to, among other things, implement the Air Quality Compliance Plan (including that such amounts could be higher than anticipated) or levels of emission reductions related to the Consent Decree resolving the New Source Review litigation or other potential regulatory initiatives, adverse regulatory or legal decisions and outcomes (including, but not limited to, the revocation of necessary licenses or operating permits and oversight by the Nuclear Regulatory Commission including, but not limited to, the Demand for Information issued to FENOC on May 14, 2007) as disclosed in our SEC filings, the timing and outcome of various proceedings before the PUCO (including, but not limited to, the Distribution Rate Cases and the generation supply plan filing for the Ohio Companies and the successful resolution of the issues remanded to the PUCO by the Supreme Court of Ohio regarding the Rate Stabilization Plan and the Rate Certainty Plan, including the deferral of fuel costs) and Met-Ed and Penelec’s transmission service charge filings with the PPUC (as well as the resolution of the Petitions for Review filed with the Commonwealth Court of Pennsylvania with respect to the transition rate plan for Met-Ed and Penelec), the continuing availability of generating units and their ability to continue to operate at or near full capacity, the ability to comply with applicable state and federal reliability standards, the ability to accomplish or realize anticipated benefits from strategic goals (including employee workforce initiatives), the ability to improve electric commodity margins and to experience growth in the distribution business, changing market conditions that could affect the value of assets held in our nuclear decommissioning trust fund, pension fund and other trust funds, the ability to access the public securities and other capital markets and the cost of such capital, the risks and other factors discussed from time to time in our SEC filings, and other similar factors.  The foregoing review of factors should not be construed as exhaustive.  New factors emerge from time to time, and it is not possible for us to predict all such factors, nor can we assess the impact of any such factor on our business or the extent to which any factor, or combination of factors, may cause results to differ materially from those contained in any forward-looking statements.  We expressly disclaim any current intention to update any forward-looking statements contained herein as a result of new information, future events, or otherwise.

(073108)

 
5

 

EX-99.2 3 ex99_2.htm EXHIBIT 99.2 - LETTER TO THE INVESTMENT COMMUNITY, DATED JULY 31, 2008 ex99_2.htm
 

 
EXHIBIT 99.2
 
   
   
 
  Ronald E. Seeholzer
 
Vice President
 
Investor Relations
   
 
FirstEnergy Corp.
 
76 S. Main Street
 
Akron, Ohio 44308
 
Tel 330-384-5415
   
   
 
July 31, 2008

TO THE INVESTMENT COMMUNITY:1

As announced in today’s attached news release, FirstEnergy Corp.’s Ohio electric utility operating companies Ohio Edison Company (OE), The Cleveland Electric Illuminating Company (CEI) and The Toledo Edison Company (TE), (collectively, the Delivery Companies), filed a comprehensive Electric Security Plan (ESP or Plan) and supporting testimony with the Public Utilities Commission of Ohio (PUCO or Commission).   A PUCO decision is required within 150 days, with new rates to be effective for the Companies’ customers January 1, 2009.  The Companies also filed a Market Rate Offer (MRO), which outlines a competitive bidding process (CBP) that would be implemented if the ESP is not approved by the PUCO.  This letter provides additional details about both the ESP and MRO.


Background

On May 1, 2008, Ohio Governor Ted Strickland signed into law Amended Substitute Senate Bill 221 (SB221).  The bill requires all Ohio utilities to file an updated rate stabilization plan, now called an ESP, to address customer rates beginning January 1, 2009.  A utility also may file an MRO in which it would have to demonstrate the following objective market criteria:

·  
the utility or its transmission service affiliate belongs to a Federal Energy Regulatory Commission (FERC) approved regional transmission organization (RTO), or there is comparable and nondiscriminatory access to the electric transmission grid;
·  
the RTO has a market-monitor function and the ability to mitigate market power or the utility’s market conduct, or a similar market monitoring function exists with the ability to identify and monitor market conditions and conduct; and
·  
a published source of information is available publicly or through subscription that identifies pricing information for traded electricity products, both on- and off-peak, that are contracts scheduled for delivery at least two years into the future.
 
______________________________
1 Please see the forward-looking statements at the end of this letter. 
 
 

 
 
Overview of the ESP

The ESP provides a flexible approach to phase in new generation pricing for customers beginning in 2009 for a three-year period, with the third year being at the option of the PUCO.  The Plan is designed to limit average overall total bill percentage increases across all three companies to single digits each year while achieving FirstEnergy’s financial, reliability and performance objectives.

The comprehensive Plan also addresses the Delivery Companies’ distribution rate case (Case No. 07-551-EL-AIR) and the Application on Remand (Case No. 08-124-EL-ATA) regarding the recovery mechanism to collect deferred fuel costs and associated carrying costs previously established in the Rate Certainty Plan (RCP), both of which are pending before the PUCO.

To support the ESP, the Delivery Companies will enter into a contract with FirstEnergy Solutions Corp. (FES) to provide wholesale generation service for their Ohio customers over the Plan’s term – 2009, 2010 and potentially 2011.  The Plan is conditioned upon FERC approval.


Major Generation-Related Provisions of the ESP

·  
The Plan proposes base generation charges for up to a three-year period, with customers receiving a phase-in credit which will reduce rates, with related costs deferred.  The average overall per kWh base generation charge before phase-in credit will be $0.075 in 2009, $0.080 in 2010 and $0.085 in 2011, and includes a minimum default service charge for generation and administrative service in the amount of $0.010 per kWh.

·  
These base customer generation charges will be reduced by the following per kWh phase-in credits:  $0.0075 in 2009, $0.0085 in 2010 and $0.0095 in 2011.  The related costs will be deferred for future collection by the Delivery Companies.  Both base generation charges and phase-in credits will be adjusted for voltage and seasonality.

·  
The resulting expected difference of $429 million in 2009, $488 million in 2010, and $553 million in 2011, plus carrying costs, will be deferred for collection under one of two proposed methods:

1.  
Recovered over a period not to exceed 10 years effective January 1, 2011 for amounts deferred in 2009 and 2010 and effective January 1, 2013 for amounts deferred in 2011, if the third year of the Plan is not terminated by the PUCO; or
2.  
Relying on authority provided in a PUCO Order, securitized and recovered over the period from the issuance to maturity of the applicable bonds not to exceed 10 years.


 
2

 


·  
The proposed base generation charges include energy, capacity (not including planning reserve margin requirements discussed below), losses and any required renewable energy requirements contained in SB221 for the Plan period.

·  
The Plan allows for recovery of costs incurred annually between May 1 and September 30 for capacity purchases to meet planning reserve margin requirements to meet FERC, North American Electric Reliability Corporation (NERC), Midwest Independent Transmission System Operator (MISO) or other applicable standards, if owned generation is insufficient.   These purchases, if required and applicable, will be recovered through a rider as a Capacity Cost Adjustment charge.

·  
The generation charges will be adjusted via a reconcilable rider to recover fuel transportation cost surcharges in excess of $30 million in 2009, $20 million in 2010 and $10 million in 2011.  In addition, the generation charges will be adjusted to recover any increase in fuel costs in 2011 over fuel costs incurred in 2010 for FES generation assets used to support the ESP.  The following items will not be considered part of fuel costs for this purpose:  emission allowances, fuel handling, disposal, lime, urea and ammonia.

·  
The base generation charges as proposed are not subject to adjustments for increased O&M, emission allowance costs, and other costs. However, such generation charges may be adjusted to recover the costs associated with new renewable requirements (other than required by SB221), new taxes and new environmental laws or new interpretations of existing environmental laws that take effect after January 1, 2008, if these costs exceed $50 million during the plan period and are related to the generation assets of FES used to support this Plan.

·  
A deferred fuel cost rider will be effective January 1, 2009, for a period not to exceed 25 years, to recover the 2006-2007 accumulated deferred balance of $235 million, including projected accumulated interest, as of December 31, 2008.

·  
Customers and government aggregation communities may switch to an alternative supplier during the ESP period, and choose to either pay or waive standby charges of $0.015 per kWh in 2009, $0.020 per kWh in 2010 and $0.025 per kWh in 2011.   Non-governmental aggregation customers waiving the standby charge would pay the higher of market prices or ESP rates for generation if they return to the utility for generation service anytime during the ESP period; those electing to pay the charge would return to standard base generation pricing provided by the ESP.  Governmental aggregation customers waiving the standby charges would return at market prices.


 
3

 


Major Energy Delivery-Related Provisions of the ESP

·  
As part of the filing, the Delivery Companies are requesting approval of outstanding issues pending in the distribution rate case before the PUCO, including an annual distribution rate increase of $75 million for OE, $34.5 million for CEI and $40.5 million for TE.  The new distribution rates would be effective January 1, 2009 for OE and TE and May 1, 2009 for CEI.  CEI would be authorized to defer $25 million of distribution-related costs during the January through April 2009 period.  The Delivery Companies will not seek additional distribution base rate increases to be effective prior to January 1, 2014, except in an emergency or for new or increased taxes.  The plan would also establish the allowed rate of return on equity for each of the Delivery Companies at 10.5%.

·  
A Delivery Service Improvement Rider will be established for each Delivery Company, effective January 1, 2009, through December 31, 2011, initially at an average $0.0020 per kWh, to ensure that the interests of the Delivery Companies and customers are aligned regarding reliability. This amount may be adjusted up or down by up to 15 percent annually, based on meeting certain goals related to distribution reliability.

·  
RTC charges for CEI customers will be waived as of January 1, 2009.  As a result, CEI would write off approximately $485 million of estimated unrecoverable transition costs and customer shopping incentives.  This write-off would reduce FirstEnergy’s 2008 earnings on a GAAP basis by $1.01 per share, but would not affect normalized non-GAAP2 earnings per share.


Other Key Provisions

·  
Transmission costs, including MISO, ancillary, and congestion charges, will continue to be recovered pursuant to a reconcilable rider.

·  
A Deferred Transmission Costs Recovery Rider will be established beginning January 1, 2009, to recover transmission costs deferred by the Delivery Companies in 2005 and accumulated interest through December 31, 2008, with recovery over a two-year period.  The estimated balance including interest as of December 31, 2008 is $43.9 million.

 
______________________________
2 A non-GAAP financial measure is a numerical measure of a company's historical or future financial performance, financial position, or cash flows that either excludes or includes amounts that are not normally excluded or included in the most directly comparable measure calculated and presented in accordance with accounting principles generally accepted in the United States (GAAP).   Non-GAAP financial measures are intended to complement, and not considered as an alternative, to the most directly comparable GAAP financial measure.  Also, non-GAAP financial measures may not be comparable to similarly titled measures used by other entities.

 
4



·  
A Deferred Distribution Cost Recovery Rider will be effective January 1, 2011 to recover the balances of deferred distribution costs previously approved by the PUCO under the RCP, as well as the deferred transition taxes and line extension costs pending in the distribution rate case.  CEI’s $25 million 2009 distribution-related cost deferrals would also be included in this rider.  These balances are estimated at $355.2 million, not including carrying charges for 2009 and 2010, as of December 31, 2008 for OE and TE and April 30, 2009 for CEI.  The CEI amount includes the additional $25 million of deferred distribution-related costs mentioned earlier.

·  
During the five-year period covering January 1, 2009, through December 31, 2013, the Delivery Companies will defer annual storm damage expenses in excess of $13.9 million, certain line extension costs, as well as depreciation, property tax obligations and post in-service carrying charges on gross plant distribution capital investments placed in service after December 31, 2008, and made to improve reliability and/or enhance the efficiency of the energy delivery system.  A Storm Damage and Distribution Enhancement rider will be established to recover the accumulated deferred balance over a 10-year period, including accumulated interest, with an effective date of January 1, 2014.  Excluding storm damage expenses, these balances are estimated at $165 million, not inclusive of carrying charges, for the 2009 through 2011 period.

·  
Separate Economic Development, Reasonable Arrangements, Demand Side Management and Energy Efficiency, and Delta Revenue Recovery riders will be established:
o  
The Economic Development Rider will mitigate overall bill impacts for certain customers through a series of charges and credits, which reflect gradualism and differences in rate schedule prices from voltage-based costs.
o  
The Reasonable Arrangements Rider provides the mechanism to administer tariff discounts allowed under SB221.
o  
The Demand Side Management and Energy Efficiency Rider will recover the cost of energy efficiency and peak load reduction programs, including resulting lost distribution revenues, as well as unrecovered DSM program costs from the RCP.
o  
A Delta Revenue Recovery Rider will be established to recover the difference in revenue between tariff pricing and the result of any reasonable arrangement, governmental special contract or unique arrangement approved by the PUCO.

·  
Effective January 1, 2009, a Non-Distribution Service Uncollectible Rider will be established and reconciled annually to reflect actual uncollectible costs.

·  
The PUCO, by Order prior to December 31, 2009, may terminate the generation service portion of the Plan, consisting of pricing and certain other provisions, effective January 1, 2011.

·  
The Plan also provides for PUCO discretion to increase the generation phase-in credit amounts to customers to the extent any charges for planning reserves exceed 1.5 percent of the overall customer rate.

 
 
5

 


·  
Upon Plan termination, generation prices for the Delivery Companies’ customers will be determined based on a competitive bid, unless agreed to otherwise by the Companies.


Delivery Company Commitments:

·  
During the five-year period from January 1, 2009, through December 31, 2013, the Delivery Companies commit to make capital investments in their energy delivery systems in the aggregate of at least $1 billion.

·  
From January 1, 2009, through December 31, 2013, the Delivery Companies will fund up to $5 million each year for customer energy efficiency and demand reduction improvements made after January 1, 2009, and up to $5 million each year for economic development and job retention activities.

·  
The Delivery Companies will conduct an Advanced Metering Infrastructure (AMI) pilot, as well as an evaluation of the pilot, and will share the results with the PUCO staff and other interested parties.  The Delivery Companies will fund the first $1 million for this study.

·  
The Delivery Companies commit to undertake a comprehensive study of the energy delivery system, including smart grid technologies and other enhancements.


Generation and Environmental Commitments:

·  
Commitment to adding 1,000 megawatts (MW) of capacity from January 1, 2007, to December 31, 2011, through:

o  
New or existing generation upgrades, including renewable generation through contracts or otherwise;
o  
Maintaining existing generation in service that otherwise would be shutdown; and/or
o  
Additional generation sources.

·  
FES will also support and/or undertake environmental remediation and reclamation of existing retired generating plants and/or manufactured gas sites owned by the Delivery Companies and for which they bear a remediation obligation.  FES will be required and obligated to cover up to a maximum of $15 million per year for three years, and the Delivery Companies will endeavor to cause such remediation to occur during this period.

The Plan is presented on behalf of all three Delivery Companies collectively, and must be accepted with respect to all of them. PUCO approval of the ESP is requested by December 10, 2008.

 
6

 

In summary, the ESP is consistent with the objectives of mitigating potential customer rate increases over the Plan’s term while preserving FirstEnergy’s financial integrity through implementation of specified regulatory accounting practices, and the ability for the Delivery Companies to recover certain increased costs and meet performance and reliability objectives.


Overview of the MRO

Concurrent with today’s ESP filing, the Delivery Companies filed an application for an MRO, which proposes a competitive bidding process to procure generation supply if the ESP is not approved and implemented.  The MRO satisfies specific requirements in SB221 related to RTO membership, an independent market monitor function and availability of market pricing information.


Major MRO Provisions

·  
The CBP will use a slice-of-system approach, where wholesale suppliers bid on slices, called tranches, of the Delivery Companies’ total load. One tranche is designed to approximate 100 MW.

·  
The initial procurement will use a staggered supply period approach and subsequently a multi-phased approach to smooth potential volatility of wholesale market fluctuations.  The initial competitive solicitation, to procure supply for delivery on January 1, 2009, will have three components:

o  
One-third of the total load of all three Companies will be bid for supply through May 31, 2010;
o  
One-third of the total load will be bid for supply through May 31, 2011; and
o  
One-third of the total load will be bid for supply through May 31, 2012.

·  
At the conclusion of the solicitation, each of the delivery periods will align with the MISO planning year, which begins on June 1st of each year and ends on May 31st of the succeeding year.

·  
After the initial procurement, commencing in 2009 and during each calendar year thereafter, the Delivery Companies will conduct two competitive solicitations to acquire one-third of the total load of all three Companies for a three-year period.

·  
A reconciliation mechanism will be used to ensure no over- or under-recovery by the Delivery Companies related to the provision of generation service.

·  
The application contains detailed methodologies by which the rates for generation service will be converted from the wholesale bid price to retail tariffs.

·  
PUCO approval of the MRO application is required by late October.

 
7

 


Severable Short Term ESP Plan

Lastly, the Delivery Companies have included in the ESP a short-term pricing proposal, called a Severable Short Term ESP Standard Service Offer, if additional time is necessary for final PUCO approval of either the ESP or to conduct the MRO in a more measured approach.  The base generation rate will be $0.0775 per kWh, reduced to $0.0675 per kWh to reflect the customer phase in/deferral.

The proposal calls for PUCO approval of the Short Term ESP on or before November 14, 2008, after which time the Delivery Companies would withdraw the option if not approved.

If approved, the Short Term ESP provides the PUCO until March 5, 2009 to act on the full ESP.  If no action is taken by that date, or if the Commission rejects the full ESP, the Delivery Companies will proceed with implementation of the MRO, with a procurement auction in early to mid April.  Power supply under the MRO under the Short Term ESP scenario would commence May 1, 2009.


Upcoming FirstEnergy Investor Events

Lehman Brothers Energy/Power Conference
September 3, 2008
New York City

Merrill Lynch Global Power & Gas Leaders Conference
September 24, 2008
New York City

Edison Electric Institute (EEI) Financial Conference
November 9-12, 2008
Phoenix, AZ


If you have any questions concerning information in this update, please contact Irene Prezelj, manager of Investor Relations, at (330) 384-3859, or Rey Jimenez, manager of Investor Relations, at (330) 761-4239, or me at (330) 384-5415.

Sincerely,



Ronald E. Seeholzer
Vice President, Investor Relations



 
8

 


Forward-looking Statements

This Letter to the Investment Community includes forward-looking statements based on information currently available to management. Such statements are subject to certain risks and uncertainties. These statements include declarations regarding our, or our management’s, intents, beliefs and current expectations.  These statements typically contain, but are not limited to, the terms “anticipate,” “potential,” “expect,” “believe,” “estimate” and similar words.   Forward-looking statements involve estimates, assumptions, known and unknown risks, uncertainties and other factors that may cause our actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements.  Actual results may differ materially due to the speed and nature of increased competition in the electric utility industry and legislative and regulatory changes affecting how generation rates will be determined following the expiration of existing rate plans in Ohio and Pennsylvania, the impact of the PUCO’s rulemaking process on our Ohio utility subsidiaries’ Electric Security Plan and Market Rate Offer filings, economic or weather conditions affecting future sales and margins, changes in markets for energy services, changing energy and commodity market prices and availability, replacement power costs being higher than anticipated or inadequately hedged, the continued ability of FirstEnergy’s regulated utilities to collect transition and other charges or to recover increased transmission costs, maintenance costs being higher than anticipated, other legislative and regulatory changes including revised environmental requirements and possible greenhouse gas emissions regulation, the impact of the U.S. Court of Appeals’ July 11, 2008 decision to vacate the CAIR rules and the scope of any laws, rules or regulations that may ultimately take their place, the uncertainty of the timing and amounts of the capital expenditures needed to, among other things, implement the Air Quality Compliance Plan (including that such amounts could be higher than anticipated) or levels of emission reductions related to the Consent Decree resolving the New Source Review litigation or other potential regulatory initiatives, adverse regulatory or legal decisions and outcomes (including, but not limited to, the revocation of necessary licenses or operating permits and oversight by the Nuclear Regulatory Commission including, but not limited to, the Demand for Information issued to FENOC on May 14, 2007) as disclosed in our SEC filings, the timing and outcome of various proceedings before the PUCO (including, but not limited to, the Distribution Rate Cases and the generation supply plan filing for the Ohio Companies and the successful resolution of the issues remanded to the PUCO by the Supreme Court of Ohio regarding the Rate Stabilization Plan and the Rate Certainty Plan, including the deferral of fuel costs) and Met-Ed and Penelec’s transmission service charge filings with the PPUC (as well as the resolution of the Petitions for Review filed with the Commonwealth Court of Pennsylvania with respect to the transition rate plan for Met-Ed and Penelec), the continuing availability of generating units and their ability to continue to operate at or near full capacity, the ability to comply with applicable state and federal reliability standards, the ability to accomplish or realize anticipated benefits from strategic goals (including employee workforce initiatives), the ability to improve electric commodity margins and to experience growth in the distribution business, changing market conditions that could affect the value of assets held in our nuclear decommissioning trust fund, pension fund and other trust funds, the ability to access the public securities and other capital markets and the cost of such capital, the risks and other factors discussed from time to time in our SEC filings, and other similar factors.  The foregoing review of factors should not be construed as exhaustive.  New factors emerge from time to time, and it is not possible for us to predict all such factors, nor can we assess the impact of any such factor on our business or the extent to which any factor, or combination of factors, may cause results to differ materially from those contained in any forward-looking statements.  We expressly disclaim any current intention to update any forward-looking statements contained herein as a result of new information, future events, or otherwise.


 
9

 

GRAPHIC 4 fe_logo2.jpg FIRSTENERGY CORP. LOGO begin 644 fe_logo2.jpg M_]C_X``02D9)1@`!`0$!+`$L``#_VP!#``@&!@<&!0@'!P<)"0@*#!0-#`L+ M#!D2$P\4'1H?'AT:'!P@)"XG("(L(QP<*#7J#A(6&AXB)BI*3E)66EYB9FJ*CI*6FIZBIJK*SM+6VM[BYNL+#Q,7& MQ\C)RM+3U-76U]C9VN'BX^3EYN?HZ>KQ\O/T]?;W^/GZ_\0`'P$``P$!`0$! M`0$!`0````````$"`P0%!@<("0H+_\0`M1$``@$"!`0#!`<%!`0``0)W``$" M`Q$$!2$Q!A)!40=A<1,B,H$(%$*1H;'!"2,S4O`58G+1"A8D-.$E\1<8&1HF M)R@I*C4V-S@Y.D-$149'2$E*4U155E=865IC9&5F9VAI:G-T=79W>'EZ@H.$ MA8:'B(F*DI.4E9:7F)F:HJ.DI::GJ*FJLK.TM;:WN+FZPL/$Q<;'R,G*TM/4 MU=;7V-G:XN/DY>;GZ.GJ\O/T]?;W^/GZ_]H`#`,!``(1`Q$`/P#W^OG+XX7D MEW\1+>SA9LPV4404$_?=W/\`(K7T;7RWX\N[R_\`B]J,MC`;FZAO(T@A5"^Y MHE7`VCKRIX^M`T=#_P`*&\3_`/0:TW\Y?\*T?#_P9UK1?$>FZGJ&L:>UI:W" MRR*K2`L!T`R,=<55_P"$\^+V?^1>;_P4R?\`Q54O$_BCQCJG@#5(O%5C]B5[ MJUBM@;1H"Y)=WZDYP$'YTP/H/[7;",.;B+:3@-O&":26^M(!&9KJ&,2$!-\@ M&XGICUKY5\08M?A_X1M,_P"N6ZO6'^])M7]%KH+KP!XBLO"8\::KJ6RZL(8Y M;6T,?F-&HP%SDX7`P<`'WI!8^@K_`%S2=+.+_4K2U/I-,J']33['5=/U1"^G MWUM=*.I@E#X_*OF+PC:^#M;NKNX\;:S?17;R9C;<=LF>2S/ACG/;BN_\*_#K M1K;Q8FN^&O%GFZ3:()72"96F+#.8W(&-A'J,]O>@+"Z;X^UV^^,L^CMJ<<>B MQ7]5$M[H<%O/NB6"6?=$_!R0HY'^Z:YKP!X4LOB! MXNU5-3:X6V"O<$P.%;'M-666#3K.*WA1OF=BS%N M<#DDM3&;=G\$O%-Y9072ZS8QK-&L@1Y)=RY&<'CK5NU^!OB:.\@DFUK3VA25 M&D"R2Y*@@D#BA/'?Q:BC6-/#;!4`4#^R)>@'^]77?#_Q3XZUC7+J/Q/I?V.P MAM&E#FQ>'=)N``!9CVW'%`7/2DN(&D\I)HRP_A#C(Q[5#'JVG2W'V>._M7FS MCRUF4MGZ9KY>\*Z%J?C;QG?1:=>-9^>TTMS<@GY(F;D<'G/`Q5CXA_#T>`)K M"6WU)KE;G<5?RQ')&RX/8^_6D*Q]2DX&3TK(F\4^'[>X\B;6]/2;.-C7*`Y_ M.O!O&GCS6-6M-'\-1Z@+9/LD'V^X+[/-E902';J%4$$XZDGTIP\"?#D:0RGQ MY$=3V9$FY!!N_P!S;NV_\"S0%CZ+66-XA*DB-&1D.&!!'KFFK=6[(SK/$53E MF#C`^M?-'@?Q->V'A+Q?I$DY>T737FA&[(C?<(SM]FW@_P#`?>JG@7P9K7BZ MRO;>VOQ8:+&ZM=S/G:S`<#`^]@$GDX&:`L?3ZW]F]M]I6Z@:WSCS1(-OY]*; M;ZE87:NUM>V\RH,L8Y58+]<'BOESPOH^J>/M3MO#5IJ#KI-DCR*S)A(XMWWR M@/+L2.I_'`KH_&WPK?P-H#ZOI>L3S0G$%U&RA"4?CC;U!/4&@+'T']NM/^?J M#_OX*GR#T-?'=WH9A\%6&N+NW7-[-:GDX^505_\`9ORKWSQ!XR_LWX-6NKQ2 M`7=[910P$'GS'7!(^@R?PH"QZ''&%TWPY+KLR'S M]0.V+/40J>/S.3^`HH`]9)"J6/``R:^;?ARIUGXTM>GD":YN<_F!_P"A5]'S M!&B='.%8%3SC@UQ^@^#O!O@_4GU#3C';W+1F,M->EN"03PS>U-)O85TMSLZ\ M4_:%O=EKH-GGJ\]PP_W551_Z&:]8?Q'HD?WM7L?PG4_R-'PO,%AIUHZ_[3D,W M_H5>^^-/&.C>#M)$VK*\OVC='#;)'N,YQRO/`&#SGBN=N+#X?S>)T\1O'=R: MG'(DBR(EP5#(H5?EQC@`=JV-3\3>&M5LWL[_`$^\O;9_O1/ILKJ?S6J]C4_E M8G6I_P`R//9[#X,ZY9F^2_32G9=S0I*T3H>X\L@\^RC%>=>'E>W\5WMWH$EQ M):64-Q*T[IM8VX0CYQVSD<'OBO49?"WPT>;S5\.:Z!G.R.&Z"_EFNBT[6O"F MB:;+I^G>%M2@M905E1=-?]X",?,3R>/6FJ%7^47MZ?<\Z^"OB/0?#LVJ-J^H M):SW`AC@#*QWCG(&`>7/ACQ"T]Q*TL MK$RC1;@_0,Q M_FM4?CU`O"=E-9Z1;WUO#-+YT@?,A+8" M]2Q/11Q4.KZO\-/$>N0ZSJ4=\][$$",3(J@(ZTSS$D,/_`#UA*@97D9P>V>HKL[W4_@G;:>;B#3H[N;;E M;:&*<.3Z'=@+^)KK=9\2?#KQ7;K!K)BN$0Y0RPNK)]&`R/P-9&G^&/A!'.LB M/:RL#D+=7+M+M=,GEM)K.VD$D,-K=",*V"!PA'8G\ZORZ7-H'@R73_"\,:3VEJRV, M?A]XH?X:>*+R'6;&:I:_JL_Q*O+#1O!WATVNGVS%D"1A5WM MP7D*_*H`]\\F@HZ:ZT#SOV:[:0*?-@(U$?\`?P[O_'&:N&L);[QR/"?@Z+>D M-F)$=P>S.69_^`QX`]\UZ#XT^(%EX+TJ3P%%IZW3PZ:EL9Y)@J?,F"2O7WQ[ MU:^!_@V?3K2?Q#J-N\4URHBM$E7#"+J7(/(W'`'L/>@#UNUM8;*S@M+:,1P0 M1K%&@Z*JC`'Y`45SCZOK:ZA<(EN'53A8O*)P,GGCGTY/7/'2BD2=(UI;,BM%B*JVD_O,WAZ+W MBON/,;KX,Z9)DVVIW,9["1%"]J?N_P#`#_C7K%8FM>$M#U^-EO["-I",":,;)%]PP_K5+$T9_P`6FO5: M$/#5H:TJGR>I>LVL=2MX-2@B1UF19(Y6BPQ!&0>1D5=J&UMH[.TAMH@1'#&L M:9]`,#^535Q.U]#M5[:A1112&%%%%`!1110`4444`%%%%`!1110`4444`%%% 8%`!1110`4444`%%%%`!1110`4444`?_9 ` end