MANAGEMENT’S DISCUSSION AND ANALYSIS

 

For the Three and Six Months Ended June 30, 2025 and 2024

 

Dated: July 31, 2025

 

 

 

 

ISOENERGY LTD.

For the three and six months ended June 30, 2025 and 2024

 

GENERAL INFORMATION

 

This Management’s Discussion and Analysis (“MD&A”) is management’s interpretation of the results and financial condition of IsoEnergy Ltd. and its subsidiaries (“IsoEnergy” or the “Company”) for the three and six months ended June 30, 2025 and includes events up to the date of this MD&A. This discussion should be read in conjunction with the unaudited condensed consolidated interim financial statements for the three and six months ended June 30, 2025 and 2024 and the notes thereto (the “Interim Financial Statements”) and other corporate filings, including the Company’s audited consolidated financial statements for the years ended December 31, 2024 and 2023 and the notes thereto (the “Annual Financial Statements”) and Annual Information Form for the year ended December 31, 2024 (the “AIF”), which are available under the Company’s profile on SEDAR+ at www.sedarplus.ca and in the Company’s initial registration Form 40-F available on EDGAR at www.sec.gov. All dollar figures stated herein are expressed in Canadian dollars and referenced as “$”, unless otherwise specified. Monetary amounts expressed in US dollars and Australian dollars are referenced as “US$” and “AUD$”, respectively. This MD&A contains forward-looking information. Please see “Note Regarding Forward-Looking Information” for a discussion of certain of the risks, uncertainties and assumptions used to develop the Company’s forward-looking information.

 

Technical Disclosure

 

All scientific and technical information in this MD&A has been reviewed and approved by Dr. Dan Brisbin, P.Geo., Ph.D.IsoEnergy’s Vice-President, Exploration. Dr. Brisbin is a “Qualified Person” for the purposes of National Instrument 43-101 - Standards of Disclosure for Mineral Projects (“NI 43-101”). Dr. Brisbin has verified the data disclosed, including sampling, analytical and test data.

 

All chemical analyses disclosed in this MD&A were completed for the Company by SRC Geoanalytical Laboratories in Saskatoon, Saskatchewan, which is independent of the Company.

 

All references in this MD&A to “Mineral Resource”, “Inferred Mineral Resource”, “Indicated Mineral Resource”, and “Mineral Reserve” have the meanings ascribed to those terms by the Canadian Institute of Mining, Metallurgy and Petroleum, as the CIM Definition Standards on Mineral Resources and Mineral Reserves adopted by CIM Council, as amended.

 

For additional information regarding the Company’s 100% owned Larocque East, Tony M, and Radio Projects and its 50% owned Thorburn Lake Project, including its Quality Assurance and Quality Control (“QA/QC”) and data verification procedures, please see the AIF and corresponding technical reports entitled “Technical Report on the Larocque East Project, Northern Saskatchewan, Canada” prepared by SLR Consulting (Canada) Ltd. and dated effective July 8, 2022 (the “Larocque East Technical Report”), “Technical Report on the Tony M Mine, Utah, USA, Report for NI 43-101” prepared by SLR International Corporation and dated effective September 9, 2022 (the “Tony M Technical Report”), “Technical Report for the Radio Project, Northern Saskatchewan” prepared by Tim Maunula, P. Geo. and dated effective August 19, 2016 and “Technical Report for the Thorburn Lake Project, Northern Saskatchewan” prepared by Tim Maunula, P. Geo. and dated effective September 26, 2016, all of which are available under the Company’s profile on SEDAR+ at www.sedarplus.ca.

 

Each of the Mineral Resource estimates with respect to the properties of IsoEnergy contained in this MD&A, except for the Larocque East Project and the Tony M Mine, are considered to be “historical estimates” as defined under NI 43-101 and are not considered to be current by IsoEnergy. See “Historical Estimates” for additional details.

 

 1 

 

 

ISOENERGY LTD.

For the three and six months ended June 30, 2025 and 2024

 

Differences in United States and Canadian Reporting Practices

 

This MD&A has been prepared in accordance with the requirements of the securities laws in effect in Canada, which differ in certain material respects from the disclosure requirements promulgated by the Securities and Exchange Commission (the “SEC”). For example, the terms “mineral reserve”, “proven mineral reserve”, “probable mineral reserve”, “mineral resource”, “measured mineral resource”, “indicated mineral resource” and “inferred mineral resource” are Canadian mining terms as defined in accordance with NI 43-101 and the Canadian Institute of Mining, Metallurgy and Petroleum (the “CIM”) - CIM Definition Standards on Mineral Resources and Mineral Reserves, adopted by the CIM Council, as amended. These definitions differ from the definitions in the disclosure requirements promulgated by the SEC. Accordingly, information contained in this MD&A may not be comparable to similar information made public by U.S. companies reporting pursuant to SEC disclosure requirements. The Company prepares its financial statements, which are referred to in this MD&A, in accordance with International Financial Reporting Standards (“IFRS”) as issued by the International Accounting Standards Board (“IASB”), and the audit of its annual financial statements is subject to Canadian auditing and auditor independence standards.

 

Industry and Economic Factors that May Affect the Business

 

The business of mining for minerals involves a high degree of risk. IsoEnergy is an exploration and development company and is subject to risks and challenges similar to companies in a comparable stage and industry. These risks include, but are not limited to, the challenges of securing adequate capital; exploration, development and operational risks inherent in the mining industry; changes in government policies and regulations; the ability to obtain the necessary permitting; as well as global economic and uranium price volatility; all of which are uncertain.

 

As with other companies involved with mineral exploration and development, the Company is subject to cost inflation on exploration drilling and development activities and the Company may experience difficulty and / or delays in securing goods (including spare parts) and services from time-to-time.

 

The underlying value of the Company’s exploration and development assets is dependent upon the existence and economic recovery of Mineral Reserves and is subject to, among others, the risks and challenges identified above. Changes in future conditions could require material write-downs of the carrying value of the Company’s exploration and development assets. The Company does not have any current Mineral Reserves.

 

In particular, the Company does not generate revenue. As a result, IsoEnergy continues to be dependent on third party financing to continue exploration and development activities on the Company’s properties. Accordingly, the Company’s future performance will be most affected by its access to financing, whether debt, equity or other means. Access to such financing, in turn, is affected by general economic conditions, the price of uranium, exploration risks and the other factors some of which are described in the section entitled “Risk Factors” included below.

 

ABOUT ISOENERGY

 

IsoEnergy was incorporated on February 2, 2016 under the Business Corporations Act (British Columbia) to acquire certain exploration assets of NexGen Energy Ltd. (“NexGen”). On October 19, 2016, IsoEnergy was listed on the TSX Venture Exchange (“TSXV”). On June 20, 2024, the Company completed its continuance from the province of British Columbia to the province of Ontario under the same name. The Company’s common shares were delisted from the TSXV and began trading on the Toronto Stock Exchange (the “TSX”) on July 8, 2024 under the trading symbol “ISO”. On March 20, 2025, the Company completed the consolidation of its issued and outstanding common shares on the basis of one post-consolidation common share for every four pre-consolidation common shares (the “Share Consolidation”). Throughout this MD&A, references to common shares, stock options, restricted share units and per share amounts are restated to post-consolidation amounts where applicable. The Share Consolidation was implemented in connection with the Company’s application to list its common shares on the NYSE American LLC (the “NYSE American”). On May 5, 2025, the Company’s common shares began trading on the NYSE American under the trading symbol “ISOU”. As of the date hereof, NexGen holds approximately 30.9% of IsoEnergy’s outstanding common shares.

 

 2 

 

 

ISOENERGY LTD.

For the three and six months ended June 30, 2025 and 2024

 

The principal business activity of IsoEnergy is the acquisition, exploration and development of uranium mineral properties in Canada, the United Sates, and Australia.

 

 

* Equity holdings include investments in NexGen, Premier American Uranium Inc., Atha Energy Corp., Purepoint Uranium Inc., and Future Fuels Inc., based on market close of July 30, 2025, and Jaguar Uranium Inc. and Royal Uranium Inc. at cost translated to Canadian dollars using the Bank of Canada USD:CAD exchange rate on the same date.

 

The Company is currently advancing it’s Larocque East Project in the Athabasca Basin, Saskatchewan, Canada, which is home to the Hurricane deposit (“Hurricane” or “Hurricane Deposit”), which has the world's highest grade published Indicated uranium Mineral Resource – 48.6 million pounds of U3O8 at an average grade of 34.5% contained in 63,800 tonnes. The Company also holds a portfolio of permitted, past-producing conventional uranium mines in Utah with toll milling agreements in place with Energy Fuels Inc. (“Energy Fuels”). These mines are currently on stand-by, ready for a potential restart as market conditions permit, positioning IsoEnergy as a near-term uranium producer. The Company also has a 50% interest in a joint venture formed on December 18, 2024 with Purepoint Uranium Group Inc. (“Purepoint Uranium”), with respect to a portfolio of exploration projects in the Athabasca Basin (the “Purepoint Joint Venture”). The Company’s projects are at varying stages of exploration and development, providing near, medium, and long-term leverage to rising uranium prices. None of the Company’s projects are currently in production and no decisions have been made to bring any of the Company’s projects to the production stage.

 

IsoEnergy’s uranium mineral properties are reflected below.

 

 

1.For additional information please refer to the Tony M Technical Report.
2.This estimate is a “historical estimate” as defined under NI 43-101. A Qualified Person has not done sufficient work to classify the historical estimate as current mineral resources and the Company is not treating the historical estimate as current mineral resources. See “Historical Estimates” below for additional details.
3.For additional information please refer to the Larocque East Technical Report.
4.Jurisdiction rankings are based on the Investment Attractiveness Index from the Fraser Institute Annual Survey of Mining Companies 2024.

 

As an exploration stage company, IsoEnergy does not have revenues and is expected to generate operating losses. As of June 30, 2025, the Company had cash and cash equivalents of $84,666,913, an accumulated deficit of $99,326,901 and adjusted working capital of $124,922,827 (as defined in “Non-IFRS Financial Measures” below).

 

 3 

 

 

ISOENERGY LTD.

For the three and six months ended June 30, 2025 and 2024

 

YEAR-TO-DATE 2025 HIGHLIGHTS

 

·Exploration update in the Athabasca Basin

 

A total of 6,396 metres of drilling in 17 diamond drill holes were successfully completed early in 2025 along the Larocque East Project focused on the Larocque regional geological-geophysical corridor (“Larocque Trend”), which hosts the Hurricane Deposit (Figure 4). Drilling intersected strongly elevated radioactivity along the eastern extensions of the Hurricane Deposit’s Main and South trends (Figure 2), as well as at Area D, 2.8 kilometres east (Figure 4), highlighting the potential for additional uranium zones near the deposit and along the Larocque Trend. The summer 2025 drill program at Larocque East has commenced and is expected to encompass a total of 20 diamond drill holes for 7,600 metres of drilling following up on encouraging results from the winter 2025 program. This will be followed by 3,400 metres of drilling in four holes on the Hawk project. The inaugural drill program at the Dorado project, operated through the Purepoint Joint Venture, focused on the Q48 target and intersected uranium mineralization in four holes and led to the recent discovery of the Nova zone.

 

Additional work has been completed or is planned to be completed in summer 2025 to advance a pipeline of exploration targets across the Athabasca Basin, including helicopter-borne MobileMT surveys at the East Rim project, ground electromagnetic (“EM”) and Ambient Noise Tomography (“ANT”) surveys on the Hawk project, and prospecting work at the Bulyea River, East Rim, and Evergreen projects.

 

·Commencement of key work programs at Tony M

 

The Company has initiated several work programs at the Tony M Mine that are intended to optimize operational readiness and reduce future production costs. Technical studies are underway, including ore sorting and High-Pressure Slurry Ablation (“HPSA”) testing programs, as well as an enhanced evaporation study. Multiple mining methods are being evaluated to optimize future production scenarios. The Tony M Mine remains fully permitted and these efforts will inform a potential production decision targeted for later in 2025.

 

·Exercise of put option on Joint Venture Agreement with Purepoint Uranium

 

On January 14, 2025, the Company exercised a put option to sell to Purepoint Uranium 10% of the Company’s initial participation interest in the Purepoint Joint Venture in exchange for 4,000,000 common shares of Purepoint Uranium. After the exercise of the put option, each of the Company and Purepoint Uranium holds a 50% interest in the Purepoint Joint Venture.

 

·Terminated transaction with Anfield Energy

 

On January 14, 2025, Anfield Energy Inc. (“Anfield Energy”) provided IsoEnergy with notice of termination of the previously announced arrangement agreement pursuant to which, among other things, IsoEnergy agreed to acquire all the issued and outstanding common shares of Anfield Energy by way of a court-approved plan of arrangement (the “AEC Arrangement”). IsoEnergy had provided a bridge loan (“Bridge Loan”) to Anfield Energy in the form of a promissory note of approximately $6.0 million and an indemnity for up to US$3.0 million in principal (the “Indemnity”) with respect to certain of Anfield Energy’s property obligations. On January 21, 2025, the Bridge Loan was fully repaid, including accrued interest at 15% per annum. On March 3, 2025, the Indemnity was released in full.

 

·Sale of Mountain Lake property

 

On February 14, 2025, the Company completed the sale of its Mountain Lake property located in Nunavut pursuant to an asset purchase agreement with Future Fuels Inc. (“Future Fuels”). As consideration for this sale, the Company received 12,500,000 common shares of Future Fuels on closing, a 2% NSR payable on all future uranium production from Mountain Lake, of which half can be repurchased by Future Fuels for $1.0 million, and a 1% NSR payable on all future uranium production on all other Future Fuels properties. The Company is entitled to receive an additional 2,500,000 common shares of Future Fuels on the earliest date practicable such that it will not result in the Company owning or controlling more than 19.99% of all outstanding common shares of Future Fuels.

 

 4 

 

 

ISOENERGY LTD.

For the three and six months ended June 30, 2025 and 2024

 

·Flow Through Financing and Concurrent Private Placement

 

On February 28, 2025, the Company closed a financing with a syndicate of underwriters (the “Underwriters”) under a bought deal financing arrangement (the “February 2025 Flow-Through Financing”) whereby the Company issued 1,333,825 “flow-through” common shares at a price of $15.00 per share, for gross proceeds of approximately $20.0 million. The Underwriters were paid a cash commission of 6.0% of the gross proceeds of the February 2025 Flow-Through Financing.

 

The proceeds from the February 2025 Flow-Through Financing are required to be spent on eligible “Canadian exploration expenses” that will qualify as “flow-through critical mineral mining expenditures” (in each case as defined in the Income Tax Act (Canada) (the “Tax Act”)) by December 31, 2026 and the Company is required to renounce the full amount of the gross proceeds of the financing to the subscribers of the flow-through shares no later than December 31, 2025.

 

Concurrent with the February 2025 Flow-Through Financing, the Company completed a non-brokered private placement with NexGen to issue 625,000 common shares at a price of $10.00 per share for total gross proceeds of approximately $6.3 million (the “Concurrent Private Placement”). The Concurrent Private Placement enabled NexGen to maintain its pro-rata ownership interest in the Company at approximately 31.8%.

 

·Share Consolidation

 

On March 20, 2025, the Company completed the consolidation of the Company’s issued and outstanding common shares on the basis of one post-consolidation common share for every four pre-consolidation common shares and any fractional shares were rounded down to the nearest whole common share. The Share Consolidation was effected following approval from the Company’s Board of Directors and regulatory approval from the TSX. The Share Consolidation was implemented in connection with the Company’s application to list its common shares on the NYSE American.

 

·Listing on the NYSE American

 

On May 5, 2025, the Company’s common shares commenced trading on the NYSE American under the trading symbol “ISOU”.

 

·Sale of royalty assets

 

On May 15, 2025, the Company completed the sale of all the current royalty interests held by IsoEnergy and its subsidiary with respect to properties in Nunavut and Argentina, to Royal Uranium Inc. (“Royal Uranium”) for 8,000,000 Royal Uranium shares at a price of $0.35 per share, for total proceeds of $2,800,000.

 

·Launch of At-The-Market equity program

 

On June 2, 2025, the Company entered into an equity distribution agreement (the “Distribution Agreement”) with a group of agents (the “Agents”). The Distribution Agreements allows to Company to distribute up to $75.0 million of its common shares, through the Agents, through the NYSE American or TSX (the “ATM Program”).

 

·Bought Deal Financing

 

On June 24, 2025, the Company issued 5,121,500 common shares at a price of $10.00 per share for gross proceeds of $51.2 million (the “Bought Deal Financing”). A cash commission of up to 5% of the gross proceeds of the financing was paid to the brokers involved in the Bought Deal Financing. NexGen participated in the Bought Deal Financing and purchased 1,200,000 common shares.

 

 5 

 

 

ISOENERGY LTD.

For the three and six months ended June 30, 2025 and 2024

 

·Sustainability Report

 

On July 15, 2025, the Company released its inaugural sustainability report for the year ended December 31, 2024 (the “Sustainability Report”). The Sustainability Report highlights the Company’s progress in advancing its global uranium portfolio with a focus on environmental stewardship, Indigenous partnerships, and responsible governance, and marks a milestone in the Company’s evolution. The full Sustainability Report is available on the Company’s website at www.isoenergy.ca.

 

·Common share issuances and stock options (1)

 

In the six months ended June 30, 2025, the Company issued 180,000 common shares on the exercise of stock options for proceeds of $277,200 and granted 516,375 stock options at an exercise price of $11.72. The Company issued 1,221,818 common shares to Queens Road Capital Investment Ltd. (“QRC”) as a result of QRC’s election to convert US$3,000,000 of the US$6,000,000 principal of the unsecured convertible debentures issued on August 18, 2020 (the “2020 Debentures”). The Company also elected to issue 16,666 common shares to Critical Path Minerals Corp. to satisfy the 1st anniversary payment due related to the Company’s purchase of the Bulyea River project (Figure 1).

 

(1) Common share issuances and stock options granted in the six months ended June 30, 2025 above are presented on a post-consolidation basis. Refer to the discussion on the Share Consolidation, as described above in “About IsoEnergy”.

 

DISCUSSION OF OPERATIONS

 

Six months ended June 30, 2025

 

During the six months ended June 30, 2025, the Company incurred $9,406,468 of exploration and evaluation spending on its exploration properties globally, as set out below. Most of the spending was at the Company’s Larocque East Project in the Athabasca Basin as further discussed below. See “Outlook” below for future exploration plans.

 

Exploration and evaluation spending

 

   Canada   United States   Australia   Total 
Drilling  $3,258,690   $-   $-   $3,258,690 
Geological and geophysical   1,532,983    88,566    -    1,621,549 
Labour and wages   716,879    541,867    104,684    1,363,430 
Camp costs   859,805    54,964    23,990    938,759 
Engineering and underground access   41,085    370,364    -    411,449 
Community relations   255,996    -    -    255,996 
Travel   136,026    40,421    27,152    203,599 
Health and safety and environmental   141,300    2,482    38,377    182,159 
Geochemistry and assays   142,541    -    -    142,541 
Claim holding costs and advance royalties   17,518    71,092    31,725    120,335 
Extension of claim refunds   (10,713)   -    -    (10,713)
Other   168,918    111,916    26,096    306,930 
Cash expenditures  $7,261,028   $1,281,672   $252,024   $8,794,724 
Share-based compensation   618,242    253,778    14,427    886,447 
Foreign exchange movements   -    (278,522)   3,819    (274,703)
Total expenditures  $7,879,270   $1,256,928   $270,270   $9,406,468 

 

 6 

 

 

ISOENERGY LTD.

For the three and six months ended June 30, 2025 and 2024

 

Canada

 

Expenditures on the Company’s properties in the Athabasca Basin (Figure 1) and Quebec were primarily focused on the following projects during the six months ended June 30, 2025:

 

   Larocque
East
   Hawk   Purepoint JV   East Rim   Other   Total 
Drilling  $2,657,684   $69,574   $531,432   $-   $-   $3,258,690 
Geological and geophysical   26,493    623,139    3,500    672,576    207,275    1,532,983 
Camp costs   711,466    39,841    92,732    -    15,766    859,805 
Labour and wages   441,381    68,311    85,931    43,451    77,805    716,879 
Community Relations   152,811    49,903    26,117    19,841    7,324    255,996 
Geochemistry and assays   142,263    -    -    -    278    142,541 
Travel   96,197    1,403    17,044    -    21,382    136,026 
Health and safety and environmental   129,188    1,750    1,657    1,540    7,165    141,300 
Engineering   -    -    -    -    41,085    41,085 
Claim holding costs   1,519    -    350    525    15,124    17,518 
Net extension of claim refunds   -    -    -    -    (10,713)   (10,713)
Other   13,397    4,933    75,693    1,143    73,752    168,918 
Cash expenditures  $4,372,399   $858,854   $834,456   $739,076   $456,243    7,261,028 
Share-based compensation   382,868    77,732    73,601    68,399    15,642    618,242 
Total expenditures  $4,755,267   $936,586   $908,057   $807,475   $471,885   $7,879,270 

 

Figure 1 – Athabasca Basin Property Location Map

 

 

 7 

 

 

ISOENERGY LTD.

For the three and six months ended June 30, 2025 and 2024

 

Larocque East Project

 

Winter 2025 – Diamond Drilling and Geophysical Work

 

The winter 2025 drilling program focused on testing resource expansion targets near the Hurricane Deposit and at the Target Area D 2.8 kilometres east-northeast of Hurricane along the prospective Larocque Trend where ANT surveys in 2023 and 2024 outlined prospective velocity anomalies. The winter 2025 drilling program was designed to drill at these identified targets and 17 diamond drill holes totalling 6,396 metres were completed. The drilling intersected strongly elevated radioactivity in five holes along the eastern extensions of the Hurricane Deposit main and south trends, as well as at Area D, 2.8 kilometres east of Hurricane, highlighting the potential for additional zones of uranium mineralization both immediately on strike of Hurricane and regionally along the 9 kilometres of the Larocque Trend on the Project (Figures 2 and 4).

 

A total of 13 holes were completed to test three interpreted structural trends at Hurricane (Figure 2). Four holes (LE25-194, 195, 198, 203) were drilled to test the projected eastern extension of the faults that control the main high-grade portion of Hurricane (the “Main Trend”). Seven holes (LE25-197, 199, 200, 201, 207, 208, 210) were drilled to test the projected extension of faults that control the Hurricane southern high-grade lens (the “South Trend”). Two holes (LE25-196, 205A) were drilled to test a structure intersected in historic drill holes in the middle sandstone north of Hurricane at the unconformity.

 

In the Main Trend, hole LE25-194 tested down-dip of structure and anomalous geochemistry intersected in LE21-89 and LE21-95A (Figure 3). Hole LE25-194 intersected widespread moderate to strongly bleached core through most of the sandstone. Strong pervasive bleaching, clay alteration and desilicification were intersected below 295 metres. Moderate hematite and grey alteration, typical of Hurricane were intersected immediately above the unconformity associated with strongly elevated radioactivity over 3.5 metres from 316.0 to 319.5 metres which included a 0.5 metre-long interval with an average RS-125 spectrometer value of 3,100 counts per second (“cps”) and a corresponding gamma ray (“2PGA”) probe value of 30,829 cps. Mineralization styles include worm-rock replacement, fault-controlled and disseminated. Hole LE25-198 drilled 100 metres east of hole LE25-194, intersected widespread bleaching throughout the sandstone. Clay and limonite alteration, centered on a fault, were intersected from 259 to 263 metres. A broad structural zone with continuous strong bleaching, desilicification, and clay alteration is present below 287 metres. Fault-controlled hydrothermal hematite and weak grey alteration were intersected approximately 10 metres above the unconformity, indicating the hole overshot the ideal target. Strong pervasive limonite and clay alteration continued to the unconformity at 316.5 metres. The basement rock immediately below the unconformity is moderately argillitized and chloritized, with above-background radioactivity as measured on core and by downhole gamma probing extending from 314.0 metres in sandstone down to 321.1 metres in basement. Peak values recorded on drill core with the RS-125 spectrometer and with the 2PGA downhole probe are 625 cps average over a 0.5 metre interval and 26,503 cps respectively. Hole LE25-198 is interpreted to have overshot the target, and potential for mineralization remains high to the north. Hole LE25-203 tested north of hole LE25-194 and intersected strong bleaching, moderate clay and desilicification centred on structural zones below 283 metres. Fault-controlled hematite alteration was intersected at 320.3 metres. A peak of 4,809 cps was recorded on the 2PGA probe at 325.0 metres, one metre below the unconformity.

 

In the South Trend, hole LE25-207 was drilled between holes LE21-101 and LE22-115A to test for continuity of mineralization. Hole LE25-207 intersected moderate bleaching beginning at 245 metres. Elevated radioactivity was intersected within hematitic breccia at 293 metres. Strong structurally controlled bleaching and moderate clay alteration were observed from 301 metres to the unconformity at 323.8 metres, with significant core loss recorded from 308 to 323 metres. Strongly elevated radioactivity was recorded over 6.0 metres from 323.0 metres in the sandstone to 329.0 metres in the basement (Figure 5). The interval included RS-125 spectrometer and 2PGA probe values of 8,800 cps averaged over a 0.5 metre interval and 30,096 cps, respectively. Hole LE25-210 tested down-dip of the sandstone structure intersected in hole LE22-118A. Strong bleaching, clay alteration, and desilicification were observed below 251 metres. Weak to moderate fault-controlled hematite alteration was intersected at 319.5 metres and 323.6 metres. Continuous radioactivity exceeding 350 cps was intersected in sandstone at 319 metres and extended into the basement to 324 metres. The highest radioactivity measured on core of 3,700 cps averaged over a 0.5 metre interval and a corresponding 2PGA downhole probe peak of 20,280 cps were recorded within a basement-hosted fault, highlighting the potential for a basement extension of Hurricane.

 

 8 

 

 

ISOENERGY LTD.

For the three and six months ended June 30, 2025 and 2024

 

Drilling in Area D along the Larocque Trend had the best radioactivity intercept to date outside of the Hurricane deposit area and confirms regional potential. Four holes (LE25-202, 204, 206 and 209) were completed this winter (Figure 4). Three holes on one section in the northwest end of Target Area D in which strongly anomalous radioactivity was intersected are summarized below.

 

Hole LE25-202, the first drill hole on section (Figure 5), intersected weak to moderate bleaching in the upper sandstone. In the lower sandstone, below 206 metres, alteration is moderate to strong with a broad bleached, clay and desilicified zone centred on faults. Moderate to strong limonite in present over a 10 metre interval below 254 metres. The hole intersected unconformity at 270.3 metres and hematitic breccia immediately below unconformity. A second hematitic fault was intersected at 282 metres before the drill hole intersected a moderately hematitic radioactive zone from 286.5 to 291.0 metres. Blebs and fracture-hosted uranium mineralization are associated with the highest RS-125 spectrometer value reading of 6,200 cps over 0.5 metres. Hole LE25-204, drilled to the south and designed to test down dip of the LE25-202 intersection, intersected broad bleaching throughout the sandstone. Moderate clay alteration and desilicification with significant core loss were intersected below 245 metres to unconformity at 262.9 metres.

 

A new geophysical model generated from joint inversion of ground loop domain EM and direct current resistivity data collected during historic EM and resistivity surveys, has highlighted a previously underexplored conductive structure 800 metres north of the main Hurricane conductor (Figure 6). This 2,500-metre trend has been inadequately tested by two historic drill holes, which is referred to as Area K and exhibits two geophysical features like those at Hurricane (Figure 4).

 

Summer 2025 – Diamond Drilling and Resource Expansion

 

The summer 2025 drilling program has commenced, with a total of 20 diamond drill holes totalling 7,600 metres planned testing Areas D, E, F, and K along a six-kilometre prospective segment of the Larocque Trend (Figure 4).

 

See the Company’s press releases dated April 23, 2025 entitled “IsoEnergy Intersects Strongly Elevated Radioactivity in Multiple Holes Immediately Along Strike of Hurricane and In Step-Out Target Area D, 2.8km East” and dated June 12, 2025 entitled “IsoEnergy Commences Athabasca Basin Summer 2025 Exploration Program” for additional information regarding the results of the 2025 winter exploration program and plans for the summer 2025 exploration program, respectively.

 

 9 

 

 

ISOENERGY LTD.

For the three and six months ended June 30, 2025 and 2024

 

Figure 2 – Location of winter 2025 drill holes with respect to the Hurricane Deposit resource footprint (blue) and the ANT seismic low velocity zone in which the deposit occurs, and projected Hurricane mineralization-controlling fault zones. RS-125 spectrometer values are highest averages over 0.5 metre intervals.

 

 

Figure 3 – Main Trend: Cross section through LE25-194 and LE25-203 on the Main Trend looking east.

 

 

 10 

 

 

ISOENERGY LTD.

For the three and six months ended June 30, 2025 and 2024

 

Figure 4 – Compilation map of Larocque East project showing the Hurricane deposit, winter 2025 and summer 2024 drill hole locations and ANT seismic velocity anomalies (A though J) on a plan view of the 2025 conductivity model 50 metres below the unconformity. 20 drill holes planned for the summer will test targets at Hurricane, in target areas D, E and F, and at the untested northern conductive trend (Target K)

 

 

Figure 5 – Cross section through LE25-202, 204 and 206 on the west end of Target Area ‘D’ looking east.

 

 

 

 11 

 

 

ISOENERGY LTD.

For the three and six months ended June 30, 2025 and 2024

 

Figure 6 – Joint resistivity – electromagnetic inversion model of the Larocque East project that highlights an untested 2,500m northern conductivity trend

 

 

Purepoint Joint Venture – Dorado Project

 

2025 – Drilling and Geophysical Work

 

Initial drilling at the Q48 target at the Dorado project, which was completed by Purepoint Uranium as the operator of the exploration program, intersected uranium mineralization in four holes and led to the “Nova Discovery” intercepts at the Q48 target area. The recent Nova Discovery further defines the mineralized trend at the Q48 target as a steeply dipping, uranium-bearing structure hosted within the basement rocks, underscoring the potential scale and strength of the system emerging at the Dorado project.

 

Drill hole PG25-04 targeted the Q48 conductor, approximately 800 metres northwest of the Company’s previous drilling in 2022 (Figure 7). This drill hole was collared with a dip of -60 degrees and encountered Athabasca sandstone to a depth of 321 metres. Clay altered granitic gneiss and pegmatites were drilled to 393 meteres then garnet-rich pelitic gneiss, with local pyrite and graphite, was drilled to the completion depth of 489 metres. The altered radioactive gouge seams were hosted by a chloritized pegmatite and returned an average of 64,220 cps over 0.4 metres.

 

 12 

 

 

ISOENERGY LTD.

For the three and six months ended June 30, 2025 and 2024

 

Drill hole PG25-05 was collared using the same azimuth as PG25-04 and intercepted radioactive structure approximately 40 metres up-dip of the latter hole (Figure 7). This drill hole encountered unconformity at 309 metres, clay altered granitic gneiss and pegmatites to 371 metres, then garnet-rich pelitic gneiss, with local pyrite and graphite, was drilled to the completion depth of 498 metres.

 

Drill hole PG25-06 targeted the brittle fault associated with mineralization at the unconformity (Figure 7). The drill hole was collared with a dip of -64 degrees and encountered Athabasca sandstone to a depth of 316 metres. Granitic gneiss displaying paleo-weathering alteration was drilled to 341 metres then generally unaltered granite, pegmatites and pelitic gneiss was drilled to the completion depth of 482 metres. Projection of the Nova Discovery zone mineralization suggests the radioactive sandstone interval of 1,040 cps over 2.3 metres in the Mount Sopris 2PGA-1000 downhole gamma probe is related to the primary mineral structure.

 

Drill hole PG25-07A resulted in a large 70 metre step out to the northeast of the PG25-05 mineralized intercept. The unconformity was intersected at a depth of 322 metres and the drill hole intercepted the radioactive structure approximately 40 metres up-dip of PG25-05.

 

The Q48 target zone lies within the southern portion of the Dorado project and is characterized by a steeply dipping, north-south trending conductive package identified through geophysical surveys. Drilling by the Company in 2022 confirmed that the conductive trend at the Q48 target hosts structure, shearing, and alteration, characteristics of uranium-bearing hydrothermal systems in the Athabasca Basin. The recently discovered Nova zone shows mineralization within granitic gneiss at 382.3 metres and extends into pelitic gneiss to a depth of 396.3 metres returning an average of 11,100 cps over 14.0 metres. A primary mineralized structure of the Nova zone is hosted in sheared, reddish-brown altered granitic gneiss with pitchblende that returned an average of 82,300 cps over 0.6 metres with a peak of 110,800 cps. A second strongly mineralized interval occurs within lost pelitic gneiss core and returned an average of 46,000 cps over 0.4 metres. All assays from the current 2025 drill program at the Dorado project are pending.

 

See the Company’s press releases dated July 8, 2025 entitled “IsoEnergy and Purepoint Confirm Uranium Discovery In Initial Drilling at the Dorado Joint Venture Project” and dated July 23, 2025 entitled “IsoEnergy and Purepoint Extend High-Grade Mineralization at the Dorado JV with a 70 Metre Step-Out Peaking at 110,800 CPS” for additional information regarding the results of the 2025 exploration program at the Dorado project.

 

Figure 7 – Location map of 2025 drill program at Q48 target area and the new Nova Discovery

 

 

 

 13 

 

 

ISOENERGY LTD.

For the three and six months ended June 30, 2025 and 2024

 

Hawk

 

Exploration work for summer 2025 at the Hawk project include a stepwise moving loop EM survey to more accurately locate conductors for drill hole targeting. ANT surveys over the northern portion of the project are in progress with the aim to test for the extension of the existing ANT velocity anomaly along the conductivity corridor in an area where there is 35 metres of unconformity elevation change between 2023 drill holes HK23-01 and HK23-02. Four diamond drill holes totalling 3,400 metres will be planned to be drilled to target coincident EM conductors and ANT velocity anomalies along a sparsely drill-tested 12-kilometre-long prospective corridor once interpretations of 2025 geophysical survey results are received and integrated with existing geoscience information. Previous drilling at the Hawk project intersected structural disruption, alteration, and elevated uranium geochemistry and radiometric responses, which are consistent with a setting conductive to unconformity-style uranium mineralization (Figure 8).

 

Figure 8 – Hawk project map showing the locations of the planned summer 2025 geophysical surveys. The locations of four drill holes planned for late in the summer will be finalized after interpretation of the geophysical survey results. Locations of past drill holes, interpreted ground EM conductors, and drill intersected faults are shown on a colour ZTEM conductivity map.

 

 

East Rim

 

A helicopter-borne MobileMT conductivity and magnetic survey was completed over the East Rim project. Data processing and interpretation are in progress and information obtained for the survey will inform targets for future exploration programs on the East Rim project.

 

Other Canadian projects

 

The majority of exploration and evaluation costs incurred for other projects in Canada during the six months ended June 30, 2025, relate to assessment report writing and community engagement payments accrued for properties in the Athabasca Basin, as well as beginning an updated technical report for the Dieter Lake property in Quebec, and community engagement work and site visits to the Matoush and Dieter Lake properties in Quebec. See “Outlook” below for further details on the 2025 exploration program plans for the Company’s properties in Canada.

 

 14 

 

 

ISOENERGY LTD.

For the three and six months ended June 30, 2025 and 2024

 

United States

 

Expenditure on the Company’s properties in the United States was as follows during the six months ended June 30, 2025:

 

   Tony M   Other   Total 
Labour and wages  $182,958   $358,909   $541,867 
Engineering and underground access   164,437    205,927    370,364 
Geological and geophysical   -    88,566    88,566 
Claim holding costs and advance royalties   30,444    40,648    71,092 
Camp costs   27,369    27,595    54,964 
Travel   27,868    12,553    40,421 
Health, safety and environmental   1,732    750    2,482 
Other   35,939    75,977    111,916 
Cash expenditures  $470,747   $810,925   $1,281,672 
Share-based compensation   169,273    84,505    253,778 
Foreign exchange movements   (278,522)   -    (278,522)
Total expenditures  $361,498   $895,430   $1,256,928 

 

Tony M Mine

 

The Company has commenced ore sorting and high-pressure slurry ablation testing programs to evaluate material processing and reduce haulage and operating costs, as well as an evaporation study with the aim to reduce capital costs and increase evaporation rates at the existing evaporation pond infrastructure at the Tony M Mine. For the ore sorting study, the Company has engaged Steinert Group to test sensor-based ore sorting on mineralized material from the Tony M Mine. This study utilizes technology that uses a combination of 3D, color, induction, and x-ray sensors to identify and separate target material, with the potential to: reduce haulage costs by concentrating mineralization and lowering transport volumes to the White Mesa Mill, where toll-milling will take place; improve mining productivity by reducing waste and enhancing ore advance rates; and minimize dilution through more precise material handling. The Company is also testing mineralized material from Tony M at Disa Technologies using their patented HPSA process. This process uses high-pressure slurry streams to separate uranium coatings from sand grains, with the intended benefit of improving process efficiency and reducing costs. Lastly, the Company is working with RWI Enhanced Evaporation to evaluate the use of landshark evaporators on the Tony M Mine evaporation pond. Preliminary results suggest that enhanced evaporation could eliminate the need for constructing additional pond capacity, reducing future dewatering timelines and associated costs for the later stages of mining.

 

The Company continues to secure and install new equipment on site, and intends to use the results of the above studies as inputs for an updated technical and economic study to be commenced later in 2025. See “Outlook” below for further details on the Company’s planned 2025 work program at the Tony M Mine.

 

Utah Exploration

 

In 2025 to date, the Company has continued to carry out geological fieldwork to advance understanding of the local sedimentary architecture and uranium mineralization controls at the Tony M Mine and surrounding claims, Daneros Mine, Rim Mine, and Sage Plain project. This new geological information is being integrated with the interpretation of the results of seismic, EM, and induced polarization surveys conducted in 2024 and compiled historic data to identify the most prospective areas for future work.

 

 15 

 

 

ISOENERGY LTD.

For the three and six months ended June 30, 2025 and 2024

 

Claim Staking and Claim Maintenance

 

The Company staked additional ground adjacent to the Tony M Mine during the six months ended June 30, 2025 at a cost of $2,630 and incurred $71,092 in expenditure on annual state lease fees, advance royalties, other short-term lease payments, and land management fees related to the Company’s properties in Utah.

 

The Company has renegotiated the royalty on the Utah Trust Lands (SITLA) lease at the Tony M Mine. The royalty on uranium production was previously 8% gross and has been reduced to 3%. In addition, the advanced minimum royalty has been meaningfully reduced.

 

Year ended December 31, 2024

 

During the year ended December 31, 2024, the Company incurred $23,495,786 of exploration and evaluation spending primarily on its exploration properties in Canada and in Utah, as set out below. Total exploration and evaluation spending in the year ended December 31, 2024 excludes $378,879 spent on properties in Argentina, which the Company disposed of during the year ended December 31, 2024.

 

Exploration and evaluation spending from continuing operations

 

   Canada   United States   Australia   Total 
Drilling  $6,000,455   $154,306   $-   $6,154,761 
Geological & geophysical   4,968,309    522,167    5,895    5,496,371 
Labour & wages   1,537,927    1,290,233    247,070    3,075,230 
Camp costs   1,936,029    83,738    -    2,019,767 
Claim holding costs and advance royalties   50,449    1,236,488    226,100    1,513,037 
Engineering and underground access   70,687    1,150,702    -    1,221,389 
Travel   364,385    247,757    33,430    645,572 
Community relations   575,462    -    -    575,462 
Health and safety and environmental   444,369    43,566    73,635    561,570 
Geochemistry & Assays   312,268    48,391    2,119    362,778 
Extension of claim refunds   (67,713)   -    -    (67,713)
Other   254,853    153,439    75,601    483,893 
Cash expenditures  $16,447,480   $4,930,787   $663,850   $22,042,117 
Share-based compensation   1,095,546    343,121    11,041    1,449,708 
Foreign exchange movements   -    4,528    (567)   3,961 
Total expenditures  $17,543,026   $5,278,436   $674,324   $23,495,786 

 

 16 

 

 

ISOENERGY LTD.

For the three and six months ended June 30, 2025 and 2024

 

Expenditure on the Company’s properties in Canada during the year ended December 31, 2024 was primarily on Larocque East, Hawk, Matoush, and East Rim, as set out below. Spending at Matoush also included travel and labour and wages related to community engagement work.

 

   Larocque East   Hawk   Matoush   East Rim   Other   Total 
Drilling  $4,757,266   $1,243,189   $-   $-   $-   $6,000,455 
Geological & geophysical   1,816,725    151,953    811,982    538,928    1,648,721    4,968,309 
Camp costs   1,282,932    483,469    134,789    -    34,839    1,936,029 
Labour & wages   867,305    205,730    178,760    72,371    213,761    1,537,927 
Community relations   321,550    73,500    1,299    14,600    164,513    575,462 
Health and safety and environmental   402,329    18,048    533    4,099    19,360    444,369 
Travel   252,175    24,894    87,294    -    22    364,385 
Geochemistry & Assays   219,942    51,924    40,000    402    -    312,268 
Engineering   70,687    -    -    -    -    70,687 
Claim holding costs   -    -    50,449    -    -    50,449 
Extension of claim refunds   -    -    -    (21,529)   (46,184)   (67,713)
Other   76,896    56,168    48,355    20,983    52,451    254,853 
Cash expenditures   10,067,807    2,308,875    1,353,461    629,854    2,087,483    16,447,480 
Share-based compensation   725,609    166,516    6,162    44,899    152,360    1,095,546 
Total expenditures  $10,793,416   $2,475,391   $1,359,623   $674,753   $2,239,843   $17,543,026 

 

Expenditure on the Company’s properties in the United States during the year ended December 31, 2024, was primarily focused on reopening access to the Tony M Mine and exploration activities on Henry Mountains, Daneros, and Sage Plain in Utah, as set out below:

 

   Tony M   Other   Total 
Labour and wages  $1,254,659   $35,574   $1,290,233 
Claim holding costs and advance royalties   1,191,257    45,231    1,236,488 
Engineering and underground access   1,150,702    -    1,150,702 
Geological & geophysical   496,671    25,496    522,167 
Camp costs   81,921    1,817    83,738 
Travel   245,060    2,697    247,757 
Drilling   154,306    -    154,306 
Geochemistry and assays   48,391    -    48,391 
Health and safety and environmental   43,566    -    43,566 
Other   153,172    267    153,439 
Cash expenditures   4,819,705    111,082    4,930,787 
Share-based compensation   343,121    -    343,121 
Foreign exchange movements   4,528    -    4,528 
Total expenditures  $5,167,354   $111,082   $5,278,436 

 

 17 

 

 

ISOENERGY LTD.

For the three and six months ended June 30, 2025 and 2024

 

OUTLOOK

 

The Company intends to actively explore all of its exploration projects as and when resources permit. The nature and extent of further exploration on any of the Company’s properties, however, will depend on the results of completed and ongoing exploration activities, an assessment of the Company’s recently acquired properties and the Company’s financial resources.

 

Activities in Canada for 2025 include completing the summer exploration programs at Larocque East, Hawk, and East Rim, with the continued focus of testing resource expansion potential near the Hurricane Deposit and evaluating greenfield targets along the Larocque Trend, as further outlined in “Discussion of Operations” above. Activities in Canada for 2025 also include completing the 2025 drilling program at the Dorado Project, where Purepoint Uranium is the operator. Planned activities on other IsoEnergy projects include prospecting, sampling, and mapping at the Bulyea River, East Rim, and Evergreen projects in the Athabasca Basin, completing an updated technical report for the Dieter Lake project, continuing geochemical sampling and geophysical work at Matoush based on 2024 exploration results, and proposing future exploration work.

 

The Company’s planned work program at the Tony M Mine in 2025 includes completing the ore sorting study, evaporation trade-off study, and evaluation of multiple mining methods. The ore sorting study is being undertaken in an effort to reduce haulage costs to the Energy Fuels White Mesa Mill. The evaporation trade-off study has shown some early potential for minimising the cost, work and timeline for full dewatering of the underground when the mine is put back into production. Results of these studies, when completed, could provide important inputs for a technical and economic study, which could begin later this year and would include a mine plan, production rates, expected operational costs and capital requirements. In any such plan, the price of uranium will be a key factor.

 

The Company intends to undertake internal technical studies on several non-material properties in 2025.

 

SELECTED FINANCIAL INFORMATION

 

Management is responsible for the Interim Financial Statements referred to in this MD&A. The Audit Committee of the Board of Directors (the “Board”) has been delegated the responsibility to review the Interim Financial Statements and MD&A and make recommendations to the Board. The Board is responsible for final approval of the Interim Financial Statements and MD&A.

 

The Interim Financial Statements have been prepared in accordance with IAS 34, Interim Financial Reporting as issued by the IFRS and interpretations of the International Financial Reporting Interpretations Committee (“IFRIC”). The Company’s presentation currency and the functional currency of its Canadian operations is Canadian dollars; the functional currency of its Australian operations is the Australian dollar; and the functional currency of its United States operations and the Argentinian discontinued operations is the US dollar.

 

The Company’s Interim Financial Statements have been prepared using IFRS applicable to a going concern, which assumes that the Company will be able to realize its assets and discharge its liabilities in the normal course of business for the foreseeable future. The ability of the Company to continue as a going concern is dependent on its ability to obtain financing and achieve future profitable operations.

 

 18 

 

 

ISOENERGY LTD.

For the three and six months ended June 30, 2025 and 2024

 

Financial Position

 

The following financial data is derived from and should be read in conjunction with the Interim Financial Statements and the Annual Financial Statements. As an exploration stage company, IsoEnergy does not have revenues.

 

   June 30, 2025   December 31, 2024  

December 31, 2023

Restated

 
Exploration and evaluation assets  $263,830,842   $262,291,098   $274,756,338 
Total assets   410,630,810    340,835,023    347,198,222 
Total current liabilities   27,578,269    35,103,977    41,065,120 
Total non-current liabilities   2,815,142    2,567,887    3,112,545 
Adjusted working capital (1)   124,922,827    56,116,942    51,644,330 
Cash dividends declared per share               Nil                 Nil     Nil 

 

(1)Adjusted working capital is a non-IFRS financial measure, as discussed below, and is defined as current assets less current liabilities, excluding flow-though share premium liabilities and convertible debenture liabilities.

 

In the six months ended June 30, 2025, the Company capitalized $9,406,468 of exploration and evaluation costs, as further described in “Discussion of Operations” above. Exploration and evaluation assets of $1,060,000 relating to 10% of the Company’s interest in the Purepoint Joint Venture and $151,010 relating to the Mountain Lake property were disposed of, as further described in “Year-to-date 2025 Highlights” above. Total assets increased primarily due to $51,215,000 raised in the Bought Deal Financing and $26,257,375 raised in the February 2025 Flow-Through Financing and Concurrent Private Placement, with associated share issuance costs of $4,463,707. Total assets also increased due to the fair value of marketable securities increasing by $9,482,825, primarily from $8,625,000 of Future Fuels common shares received on the disposal of the Mountain Lake property, $2,800,000 of Royal Uranium common shares on the disposal of certain of the Company’s royalty assets, and $1,060,000 of Purepoint Uranium common shares received from the exercise of the put option in the Purepoint Joint Venture, offset by a fair value loss related to marketable securities of $3,252,175 during the six months ended June 30, 2025.

 

Current liabilities on June 30, 2025, include a flow through share premium liability of $7,648,249 and $380,331 related to the February 2025 Flow-Through Financing and the February 2024 Private Placement (as defined below), respectively. Accounts payable and accrued liabilities increased by $67,637 during the six months ended June 30, 2025 mostly as a result of additional professional fees and public company costs related to the Company’s listing on the NYSE American and Bought Deal Financing, as well as timing variances related to the start of the 2025 winter exploration program at Larocque East and the 2025 summer exploration programs in the Athabasca Basin. The fair value of the Company’s 2020 Debentures and the US$4 million in principle of unsecured convertible debentures issued on December 6, 2022 (the “2022 Debentures” and collectively with the 2020 Debentures, the “Debentures”) decreased by $14,298,515 during the six months ended June 30, 2025 mostly due to the partial conversion of US$3 million principal of the 2020 Debentures, further described in “Year-to-date 2025 Highlights” above and discussed in “Results of Operations” below.

 

Adjusted working capital increased during the six months ended June 30, 2025 mainly due to the Bought Deal Financing, February 2025 Flow-Through Financing, and Concurrent Private Placement, as well as an increase in the fair value of marketable securities during the period, partly offset by exploration and evaluation spending discussed above.

 

 19 

 

 

ISOENERGY LTD.

For the three and six months ended June 30, 2025 and 2024

 

Results of Operations

 

The following financial data is derived from and should be read in conjunction with the Interim Financial Statements.

 

   For the three months ended June 30   For the six months ended June 30 
   2025   2024   2025   2024 
General and administrative costs                    
Share-based compensation  $1,101,397   $1,054,796   $3,047,236   $2,231,325 
Administrative salaries, contractor and directors’ fees   788,798    802,078    1,584,112    1,873,115 
Investor relations   302,131    244,021    523,087    450,660 
Office and administrative   293,457    184,524    537,457    405,985 
Professional and consultant fees   889,659    701,840    1,950,470    1,360,712 
Travel   90,292    117,686    266,317    263,750 
Public company costs   480,127    94,788    625,853    260,954 
Total general and administrative costs  $(3,945,861)   (3,199,733)  $(8,534,532)   (6,846,501)
Interest income   364,387    563,560    674,684    1,050,077 
Interest expense   (34,179)   (20,413)   (76,058)   (40,303)
Interest on convertible debentures   (226,594)   (311,288)   (489,144)   (618,095)
Fair value gain (loss) on convertible debentures   627,079    (2,856,776)   338,497    (4,755,860)
Gain on disposal of assets   820,394    -    11,189,425    - 
Foreign exchange (loss) gain   (75,864)   (38,579)   (68,945)   12,534 
Other income   92,020    27,322    523,941    46,702 
(Loss) income from operations  $(2,378,618)   (5,835,907)  $3,557,868    (11,151,446)
Deferred income tax recovery (expense)   491,348    (168,253)   (339,523)   488,674 
(Loss) income from continuing operations  $(1,887,270)   (6,004,160)  $3,218,345    (10,662,772)
Loss from discontinued operations (1)   -    (55,133)   -    (126,499)
(Loss) income for period  $(1,887,270)  $(6,059,293)  $3,218,345   $(10,789,271)
(Loss) income per share – basic (2)  $(0.04)  $(0.13)  $0.07   $(0.24)
(Loss) income per share – diluted (2)  $(0.03)  $(0.13)  $0.07   $(0.24)
Loss per share relating to discontinued operations – basic and diluted (1)(2)   Nil   $(0.00)   Nil   $(0.00)

 

(1)Loss from discontinued operations, net of tax, relates to the Argentina reporting segment, which was disposed of during the year ended December 31, 2024.
(2)(Loss) income per share amounts in the comparative period were retroactively restated on a post-consolidation basis. Refer to the discussion on the Share Consolidation, as described above in “About IsoEnergy”.

 

Three months ended June 30, 2025

 

During the three months ended June 30, 2025, the Company recorded a net loss of $1,887,270, compared to a net loss of $6,059,293 in the three months ended June 30, 2024. Included in the net loss for the three months ended June 30, 2024, is a $55,133 loss from discontinued operations relating to the Argentina reporting segment that was sold in 2024. The main driver of the difference between the two periods was a gain on the sale of certain royalty assets of $820,394, a fair value gain on the Debentures of $627,079, and a deferred income tax recovery of $491,348, partially offset by an increase in general and administrative costs of $746,128. Other factors causing the difference between the two periods is further described below.

 

 20 

 

 

ISOENERGY LTD.

For the three and six months ended June 30, 2025 and 2024

 

General and administrative costs

 

Share-based compensation was $1,101,397 in the three months ended June 30, 2025, compared to $1,054,796 in the three months ended June 30, 2024. The share-based compensation expense is a non-cash charge based on the Black-Scholes value of stock options, calculated using the graded vesting method. Stock options granted to directors, consultants and employees typically vest in three tranches – 1/3 immediately, 1/3 on the first anniversary of the grant date, and the remaining 1/3 on the second anniversary of the grant date, with the corresponding share-based compensation expense being recognized over this period. The similar expense in both periods is consistent with the fact that there were no material grants of stock options in either period.

 

Administrative salaries, contractor and directors’ fees of $788,798 for the three months ended June 30, 2025, decreased slightly from $802,078 during the prior period primarily due to a smaller management team as compared to the prior period.

 

Investor relations expenses relate primarily to costs incurred in communicating with existing and potential shareholders, conferences and marketing. The increase in the current period is primarily from additional marketing services in Europe engaged.

 

Office and administrative expenses primarily consist of office operating costs and other general administrative costs. The increase in office and administrative expenses from the prior period is primarily from the Company being responsible for all costs for its new office in Saskatoon, Saskatchewan, whereas previously it shared its office and office-related services in that city with NexGen.

 

Professional and consultant fees were $889,659 for the three months ended June 30, 2025, compared to $701,840 for the three months ended June 30, 2024. Professional fees were higher mainly due to legal fees incurred for the Company’s listing on the NYSE American, increased business development activities, and legal fees related to the now terminated AEC Arrangement, including costs incurred for completing customary termination procedures such as repayment of the Bridge Loan and release of the Indemnity.

 

Travel expenses primarily relate to travel and accommodation costs for conferences, business development activities, public relations activities, and general corporate purposes. Travel costs decreased slightly from the prior period mainly due to the timing of site visits undertaken compared to the prior period.

 

Public company costs consist primarily of costs associated with the Company’s continuous disclosure obligations, listing fees, directors and officers insurance, transfer agent costs, press releases and other shareholder communications. The increase in public company costs from $94,788 to $480,127 is primarily due to the additional costs of uplisting to the NYSE American, including the initial listing and sustaining fees, additional insurance requirements, and filing costs.

 

Other items

 

The Company recorded interest income of $364,387 in the three months ended June 30, 2025, compared to $563,560 in the three months ended June 30, 2024, which represents interest earned on cash balances. The amounts were lower in the three months ended June 30, 2025 mainly due to a lower average cash balance and a decrease in interest rates earned on cash.

 

Interest expense on the Debentures was $226,594 in the three months ended June 30, 2025, which was lower than the $311,288 in the three months ended June 30, 2024. The 2020 Debentures and 2022 Debentures bear interest of 8.5% and 10%, respectively, per annum and are payable, with a combination of cash and common shares of the Company, on June 30 and December 31. The principal amount of the 2020 Debentures decreased in the period following the conversion of US$3 million of the US$6 million principal of the 2020 Debentures.

 

 21 

 

 

ISOENERGY LTD.

For the three and six months ended June 30, 2025 and 2024

 

The fair value of the Debentures on June 30, 2025 was $15,980,791 compared to $16,607,205 on March 31, 2025. The decrease in the fair value of the Debentures is primarily due to the strengthening of the Canadian dollar against the US dollar during the three months. The decrease in fair value include a decrease in the fair value of the Debentures of $627,079 included in the statement of income, partially offset by a fair value gain attributable to the change in credit risk of $665 included in other comprehensive income (loss). The Company’s Debentures are classified as measured at fair value through profit and loss. In accordance with IFRS 9 – Financial Instruments, the part of a fair value change due to an entity’s own credit risk is presented in other comprehensive income (loss). As of June 30, 2025, the discount on the 2020 Debentures is assumed to be 0%, as it is assumed that the 2020 Debentures can be converted immediately and the shares received can be sold at the fair market value of the conversion shares, with no additional discount. As of June 30, 2025, the time to maturity of the 2020 Debentures and 2022 Debentures was 0.1 and 2.4 years, respectively.

 

Foreign exchange loss was $75,864 in the three months ended June 30, 2025, compared to a loss of $38,579 in the three months ended June 30, 2024, and mainly relates to exchange movements on working capital in United States dollars held by the Company. The Company has larger US dollar denominated cash balances compared to the prior period, which combined with the weakening of the US dollar compared to the Canadian dollar, led to an increased foreign exchange loss.

 

Other income was $92,021 in the three months ended June 30, 2025, compared to $27,322 in the three months ended June 30, 2024. This primarily relates to higher timber sales and an increase in rental income earned from the Company’s operations in the US.

 

The Company records a deferred tax recovery or expense which is comprised of a recovery on losses or expense on gains recognized in the period and, when applicable, the release of flow-through share premium liability which is offset by the renunciation of flow-through share expenditures to shareholders. In the three months ended June 30, 2025, this resulted in a recovery of $491,348, compared to an expense of $168,253 in the three months ended June 30, 2024. The increase in expense is due to a larger proportion of flow-through share spending renounced during the three months ended June 30, 2025.

 

Six months ended June 30, 2025

 

During the six months ended June 30, 2025, the Company recorded net income of $3,218,345, compared to net loss of $10,789,271 in the six months ended June 30, 2024. Included in the net loss for the six months ended June 30, 2024, is a $126,499 loss from discontinued operations relating to the Argentina reporting segment that was sold in 2024. The main driver of the difference between the two periods was a gain on the sale of the Mountain Lake property and certain royalty assets of $11,189,425 and a fair value gain on the Debentures of $338,497 in the 6 months ended June 30, 2025, partially offset by an increase in general and administrative costs of $1,688,031. Other factors causing the difference between the two periods is further described below.

 

General and administrative costs

 

Share-based compensation was $3,047,236 in the six months ended June 30, 2025, compared to $2,231,325 in the six months ended June 30, 2024. The share-based compensation expense is a non-cash charge based on the Black-Scholes value of stock options, calculated using the graded vesting method. Stock options granted to directors, consultants and employees typically vest in three tranches – 1/3 immediately, 1/3 on the first anniversary of the grant date, and the remaining 1/3 on the second anniversary of the grant date, with the corresponding share-based compensation expense being recognized over this period. The increase in the current period was primarily due to stock options granted during the six months ended June 30, 2025 while no material amounts were granted in the prior period.

 

Administrative salaries, contractor and directors’ fees of $1,584,112 for the six months ended June 30, 2025, decreased from $1,873,115 during the prior period primarily due to a smaller management team as compared to the prior period.

 

 22 

 

 

ISOENERGY LTD.

For the three and six months ended June 30, 2025 and 2024

 

Investor relations expenses relate primarily to costs incurred in communicating with existing and potential shareholders, conferences and marketing. The variance between the two periods is for similar reasons discussed above for the three months ended June 30, 2025.

 

Office and administrative expenses primarily consist of office operating costs and other general administrative costs. The variance between the two periods is for similar reasons discussed above for the three months ended June 30, 2025.

 

Professional and consultant fees were $1,950,470 for the six months ended June 30, 2025, compared to $1,360,712 for the six months ended June 30, 2024. Professional fees were higher mainly due to similar reasons discussed above for the three months ended June 30, 2025.

 

Travel expenses primarily relate to travel and accommodation costs for conferences, business development activities, public relations activities, and general corporate purposes. Travel costs between the two periods remained mostly similar as the timing of business development and corporate activities mostly offset the timing of site visits between the two periods.

 

Public company costs consist primarily of costs associated with the Company’s continuous disclosure obligations, listing fees, directors and officers insurance, transfer agent costs, press releases and other shareholder communications. The increase in public company costs from the prior period is for similar reasons discussed above for the three months ended June 30, 2025.

 

Other items

 

The Company recorded interest income of $674,684 in the six months ended June 30, 2025, compared to $1,050,077 in the three months ended June 30, 2024, which represents interest earned on cash balances and the Bridge Loan advanced to Anfield Energy. The amounts were lower in the six months ended June 30, 2025 mainly due to a lower average cash balance and a decrease in interest rates earned on cash, partially offset by interest earned on the Bridge Loan to Anfield Energy, which was fully repaid in January 2025.

 

Interest expense on the Debentures was $489,144 in the six months ended June 30, 2025, which was lower than the $618,095 in the six months ended June 30, 2024. The reasons for the decrease in the interest expense on the Debentures between the two periods are for similar reasons discussed above for the three months ended June 30, 2025.

 

The fair value of the Debentures on June 30, 2025 was $15,980,791 compared to $30,279,306 on December 31, 2024. The decrease in the fair value of the Debentures is primarily due to the partial conversion of the 2020 Debentures which resulted in debentures with a fair value of $13,928,728 being derecognized. The fair value was further decreased by a fair value gain on the Debentures of $338,497 included in the statement of income and a fair value gain attributable to the change in credit risk of $31,290 included in other comprehensive income (loss).

 

Foreign exchange loss was $68,945 in the six months ended June 30, 2025, compared to a gain of $12,534 in the six months ended June 30, 2024, and mainly relates to the same fluctuations discussed above for the three months ended June 30, 2025.

 

Other income was $523,942 in the six months ended June 30, 2025, compared to $46,702 in the six months ended June 30, 2024. This primarily relates to higher timber sales and an increase in rental income earned from the Company’s operations in the US.

 

The Company records a deferred tax recovery or expense which is comprised of a recovery on losses or expense on gains recognized in the period and, when applicable, the release of flow-through share premium liability which is offset by the renunciation of flow-through share expenditures to shareholders. In the six months ended June 30, 2025, this resulted in an expense of $339,523, compared to a recovery of $488,674 in the six months ended June 30, 2024. The increase in expense is mainly due to a gain in the period as compared to a loss in the prior period and a smaller proportion of flow-through share spending renounced during the six months ended June 30, 2025.

 

 23 

 

 

ISOENERGY LTD.

For the three and six months ended June 30, 2025 and 2024

 

SUMMARY OF QUARTERLY RESULTS

 

The following information is derived from the Company’s Interim and Annual Financial Statements prepared in accordance with IFRS. The information below should be read in conjunction with the Company’s interim and annual financial statements for each of the past seven quarters.

 

   Jun. 30, 2025   Mar. 31, 2025   Dec. 31, 2024   Sep. 30, 2024 
Revenue                 Nil                   Nil                   Nil                   Nil  
Net (loss) income  $(1,887,270)  $5,105,615   $(35,505,105)  $4,159,285 
Net (loss) income per share: (1)                    
Basic  $(0.04)  $0.11   $(0.80)  $0.08 
Diluted  $(0.03)  $0.10   $(0.88)  $(0.00)
Loss from discontinued operations (2)   Nil    Nil    Nil   $(1,859)
Loss from discontinued operations per share – basic and diluted (1)(2)   Nil    Nil    Nil   $(0.00)

 

   Jun. 30, 2024   Mar. 31, 2024   Dec. 31, 2023   Sep. 30, 2023 
Revenue   Nil     Nil     Nil                     Nil  
Net (loss) income  $(6,059,293)  $(4,729,978)  $4,630,838   $(21,988,054)
Net (loss) income per share: (1)                    
Basic  $(0.13)  $0.16   $0.16   $(0.80)
Diluted  $(0.13)  $(0.08)  $(0.08)  $(0.80)
Loss from discontinued operations (2)  $(55,133)  $(71,366)  $(17,856)   Nil 
Loss from discontinued operations per share – basic and diluted (1)(2)  $(0.00)  $(0.00)  $(0.00)   Nil 

 

(1)(Loss) income per share amounts in the past seven quarters presented are retroactively restated on a post-consolidation basis. Refer to the discussion on the Share Consolidation, as described above in “About IsoEnergy”.
(2)Loss from discontinued operations relates to the Argentina reporting segment, as described above.

 

IsoEnergy does not derive any revenue from its operations. Its primary focus is the acquisition, exploration and development of mineral properties. As a result, the income (loss) per period has fluctuated depending on the Company’s activity level and periodic variances in certain items. Quarterly periods are therefore not comparable. As part of the Company’s strategy to evaluate additional Merger and Acquisition (“M&A”) opportunities throughout the life cycle of mineral properties, the Company may incur gains or losses related to such transactions or incur expenses for M&A opportunities that do not materialize. In the three months ended June 30, 2025, a gain of $820,394 was recorded on the sale of certain of the Company’s royalty assets; in three months ended March 31, 2025, a $10,369,031 gain was recorded on the sale of the Mountain Lake property; in the three months ended December 31, 2024, a loss of $25,616,241 was recorded from the contribution of exploration and evaluation assets to the Purepoint Joint Venture; and in the three months ended June 30, 2024, a $5,300,611 gain was recorded on the disposal of its Argentina assets.

 

The Company also assesses for indicators of impairment on its property and equipment and exploration and evaluation assets quarterly, as required by the relevant IFRS. If such indicators are identified, an analysis to determine its recoverable value is performed and if such amount is lower than the carrying value, a loss is recognized for the difference. In the three months ended December 31, 2024, the Company identified indicators of impairment on certain exploration and evaluation assets located in the Athabasca Basin primarily as a result of the loss on the formation of the Purepoint Joint Venture and recorded a write-down of $14,342,736.

 

 24 

 

 

ISOENERGY LTD.

For the three and six months ended June 30, 2025 and 2024

 

In the third quarter of 2020, the Company issued the 2020 Debentures and in the fourth quarter of 2022 issued the 2022 Debentures, both of which are accounted for as measured at fair value through profit and loss, which has resulted in a gain on the revaluation of the Debentures in the three months ended June 30, 2023, three months ended December 31, 2023, three months ended September 30, 2024, three months ended December 31, 2024, three months ended June 30, 2025, and losses in every other period.

 

LIQUIDITY AND CAPITAL RESOURCES

 

IsoEnergy has no revenue-producing operations, earns only minimal interest income on cash, and is expected to have recurring operating losses. As of June 30, 2025, the Company had an accumulated deficit of $99,326,901.

 

During the six months ended June 30, 2025, the Company utilized cash on hand to invest $8,826,282 (net of changes in accounts payable) in exploration and evaluation assets, $6,313,318 for expenditure on its corporate and business development activities, including movements in working capital, and was repaid $6,168,995 including interest on the Bridge Loan previously advanced to Anfield Energy.

 

During the six months ended June 30, 2025, the Company received $73,008,668 in net proceeds from the Bought Deal Financing, February 2025 Flow-Through Financing, and the Concurrent Private Placement with NexGen.

 

As of the date of this MD&A, the Company has approximately $81.7 million in cash, $43.3 million in marketable securities and $125.3 million in adjusted working capital.

 

The Company has fully funded its global exploration and pre-development activities, as well as any corporate initiatives and general working capital, up to the end of December 31, 2025 and beyond.

 

The ability of the Company to continue as a going concern is dependent on its ability to obtain financing and achieve future profitable operations.

 

Should the Company require additional financing under its $200 million base shelf prospectus filed on September 5, 2024 or otherwise, Management will determine whether to accept any offer to finance, weighing such factors as the financing terms, the results of exploration programs and technical studies, the Company’s share price at the time and current market conditions, among others. Circumstances that could impair the Company’s ability to raise additional funds include general economic conditions, the price of uranium and certain other factors set forth under “Risk Factors” below and above under “Industry and Economic Factors that May Affect the Business”. A failure to obtain financing as and when required, could require the Company to reduce its exploration and corporate activity levels.

 

Use of Proceeds

 

On December 6, 2023, the Company received the proceeds from a $36.6 million financing initially closed in escrow on October 19, 2023. The net proceeds of the financing were to be used to advance exploration and development of the Company’s uranium assets, as well as for working capital and general corporate purposes. On February 9, 2024, the Company completed a brokered “bought-deal” private placement for gross proceeds of $23 million (the “February 2024 Private Placement”). The proceeds from the February 2024 Private Placement are required to be spent on eligible “Canadian exploration expenses” that will qualify as “flow-through critical mineral mining expenditures” (in each case as defined in the Tax Act) by December 31, 2025.

 

 25 

 

 

ISOENERGY LTD.

For the three and six months ended June 30, 2025 and 2024

 

On February 28, 2025, the Company received gross proceeds of $20.0 million from the February 2025 Flow-Through Financing and $6.3 million from the Concurrent Private Placement. The proceeds from the February 2025 Flow-Through Financing are required to be spent on eligible “Canadian exploration expenses” that will qualify as “flow-through critical mineral mining expenditures” (in each case as defined in the Tax Act) by December 31, 2026. The proceeds of Concurrent Private Placement of the financing were to be used for other non-qualifying exploration of the Company’s Canadian properties, costs associated with the listing on the NYSE American, and for working capital and general corporate purposes.

 

On June 24, 2025, the Company received gross proceeds of $51.2 million from the Bought Deal Financing. The proceeds of the Bought Deal Offering are expected to be used to fund continued development and further exploration of the Company’s mineral properties, and for general corporate purposes.

 

The gross proceeds received from these financings have been used as follows:

 

Proceeds  Anticipated use
of proceeds
   Use of proceeds
to June 30, 2025
   Remaining at
June 30, 2025
 
December 6, 2023 financing:               
Exploration and development, working capital, and general corporate purposes  $36,605,250   $26,232,372   $10,372,878 
February 2024 Private Placement:               
Canadian exploration expenses   23,000,000    20,622,929    2,377,071 
February 2025 Flow-Through Financing:
Canadian exploration expenses in 2025   9,420,000    886,754    8,533,246 
Canadian exploration expenses in 2026   10,587,375    -    10,587,375 
Concurrent Private Placement:               
Other exploration expenses   750,000    -    750,000 
NYSE American listing costs   2,000,000    768,657    1,231,343 
Costs associated with the February 2024 Flow-Through Financing   1,600,000    1,600,000    - 
General corporate purposes   1,900,000    -    1,900,000 
Bought Deal Financing:               
Development and exploration   39,515,000    -    39,515,000 
Equity investments and acquisition- related expenditures   5,000,000    -    5,000,000 
General corporate purposes   4,400,000    -    4,400,000 
Costs associated with the Bought Deal Financing   2,300,000    2,300,000    - 
   $137,077,625   $52,410,712   $84,666,913 

 

The balance of the proceeds remaining in treasury are intended to be applied towards the intended uses described above. The Company’s properties are in good standing with the applicable governmental authority. Other than the contractually agreed upon exploration budget in 2025 for the Purepoint Joint Venture, the Company does not have any contractually imposed expenditure requirements.

 

The Company has not paid any dividends and management does not expect that this will change in the near future. Working capital is mainly held in cash, cash deposits available on short-term demand, and marketable securities, all of which are highly liquid.

 

 26 

 

 

ISOENERGY LTD.

For the three and six months ended June 30, 2025 and 2024

 

COMMITMENTS AND CONTINGENCIES

 

The Company’s significant undiscounted commitments at June 30, 2025 are as follows. The Debentures are classified as a current liability, however the counterparty conversion option allows the principal to be converted to common shares.

 

   Less than 1 year   1 to 3 years   4 to 5 years   Total 
Accounts payable and accrued liabilities  $3,415,933   $-   $-   $3,415,933 
Debentures   15,980,791    -    -    15,980,791 
Flow-through share premium liabilities   8,028,580    -    -    8,028,580 
Purepoint Joint Venture advances   1,334,000    -    -    1,334,000 
Lease liabilities   197,976    324,559    77,733    600,268 
   $28,957,280   $324,559   $77,733   $29,359,572 

 

Flow-through funding commitments

 

The premium received for a flow-through share, which is the price received for the share in excess of the market price of the share, is recorded as a flow-through share premium liability. This liability is subsequently reduced when the required exploration expenditures are made, on a pro rata basis, and accordingly, a recovery of flow-through premium is then recorded as a reduction in the deferred tax expense to the extent that deferred income tax assets are available.

 

As of June 30, 2025, the Company is obligated to spend $2,377,071 on eligible exploration expenditures by December 31, 2025 related to the February 2024 Private Placement and $19,120,621 on eligible exploration expenditures by December 31, 2026 related to the February 2025 Flow-Through Financing.

 

Contingent payment obligations

 

The Company has an obligation to make a contingent payment of $500,000 related to the acquisition of the West Newcastle Range, Teddy Mountain and Ardmore East Projects, if either of the following milestones are met within eight years:

 

·a NI 43-101 compliant Mineral Resource estimate for the West Newcastle Range and Teddy Mountain Projects is prepared where the Mineral Resource estimate is greater than or equal to 6.0 million pounds of U₃O₈; or

 

·with respect to the Ardmore East Project, the Mineral Resources estimate is greater than or equal to 6.0 million pounds of U₃O₈ equivalent.

 

Royalties and Environmental Obligations

 

In addition to applicable federal, provincial/state and municipal severance taxes, duties and advance royalties, the Company’s exploration and evaluation properties are subject to certain royalties, which may or may not be payable in future, depending on whether revenue is derived from the claims or leases to which these royalties are applicable.

 

The Company’s mining and exploration activities are subject to various laws and regulations governing the protection of the environment. These laws and regulations are continually changing and generally becoming more restrictive. The Company believes its operations are materially in compliance with all applicable laws and regulations. The Company has made, and expects to make in the future, expenditures to comply with such laws and regulations.

 

 27 

 

 

ISOENERGY LTD.

For the three and six months ended June 30, 2025 and 2024

 

OUTSTANDING SHARE DATA(1)

 

The authorized capital of IsoEnergy consists of an unlimited number of common shares. As of the date of this MD&A, there were 53,377,771 common shares, 4,053,832 stock options, and 87,500 RSUs outstanding, each stock option entitling the holder to purchase one common share of IsoEnergy.

 

In August 2020, the Company issued the 2020 Debentures with an 8.5% coupon and a five-year term, which are convertible at $3.52 per share; and in December 2022, the Company issued the 2022 Debentures with a 10% coupon and a five-year term, which are convertible at $17.32 per share. The Company has US$3 million and US$4 million principal remaining outstanding from the 2020 Debentures and 2022 Debentures, respectively.

 

Stock options outstanding as of the date of this MD&A, and the range of exercise prices thereof are set forth below:

 

Range of
exercise prices
  Number of
options
   Weighted
average
exercise price
   Number of
options
exercisable
   Weighted
average
exercise price
   Weighted average
remaining
contractual life
(years)
 
$4.20 - $10.44   334,862   $9.70    334,862   $9.70    2.6 
$10.45 - $12.44   1,017,276    11.73    673,026    11.73    3.1 
$12.45 - $15.24   1,323,327    13.25    858,577    13.51    3.1 
$15.25 - $16.48   490,000    15.96    490,000    15.96    1.4 
$16.49 - $18.16   590,483    16.56    423,816    16.57    3.0 
$18.17 - $20.40   297,884    19.92    297,884    19.92    1.4 
    4,053,832   $13.88    3,078,165   $14.14    2.7 

 

OFF-BALANCE SHEET ARRANGEMENTS

 

The Company had no off-balance sheet arrangements as of June 30, 2025 or as of the date hereof.

 

NON-IFRS FINANCIAL MEASURES

 

Working capital and adjusted working capital are non-IFRS financial measures included in this MD&A, as discussed below. We believe that working capital and adjusted working capital, in addition to conventional measures prepared in accordance with IFRS, provide investors with an improved ability to evaluate the underlying financial position of the Company. These non-IFRS financial measures are intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. This financial measure does not have any standardized meaning prescribed under IFRS and therefore may not be comparable to those of other issuers.

 

Non-IFRS financial measures are defined in National Instrument 52-112 – Non-GAAP and Other Financial Measures Disclosure as a financial measure disclosed that (a) depicts the historical or expected future financial performance, financial position or cash flow of an entity, (b) with respect to its composition, excludes an amount that is included in, or includes an amount that is excluded from, the composition of the most directly comparable financial measure disclosed in the primary financial statements of the entity, (c) is not disclosed in the financial statements of the entity, and (d) is not a ratio, fraction, percentage or similar representation.

 

(1)Amounts are retroactively restated on a post-consolidation basis. Refer to the discussion on the Share Consolidation, as described above in “About IsoEnergy”.

 

 28 

 

 

ISOENERGY LTD.

For the three and six months ended June 30, 2025 and 2024

 

The adjusted working capital amount disclosed in this MD&A would be considered a non-IFRS financial measure and is defined as current assets less current liabilities, excluding flow-though share premium liabilities and debenture liabilities, as calculated below:

 

Current assets  $128,491,725 
Current liabilities   (27,578,269)
Working capital   100,913,456 
Flow-through share premium liability   8,028,580 
Debentures   15,980,791 
Adjusted working capital  $124,922,827 

 

TRANSACTIONS WITH RELATED PARTIES

 

NexGen is a related party of the Company due to its ownership in the Company and the overlapping members of the Board between NexGen and the Company. The Company’s key management personnel and directors are related parties. The following companies are related parties due to their relationship to the Company: Atha Energy Corp. (“Atha Energy”), Premier American Uranium Inc. (“Premier American Uranium”), Green Shift Commodities Ltd. (“Green Shift”), and Purepoint Uranium.

 

Key management personnel include those persons having authority and responsibility for planning, directing and controlling the activities of the Company as a whole. The Company has determined that key management personnel consist of members of the Board and the Company’s senior officers.

 

Remuneration attributed to key management personnel is summarized as follows. The amounts below in the prior period include short-term compensation and share-based compensation paid to the former President and Executive Vice-President, Exploration & Development, who resigned on August 31, 2024 and October 31, 2024, respectively.

 

Three months ended June 30, 2025  Short term compensation   Share-based compensation   Total 
Expensed to the statement of income (loss) and comprehensive income  $432,501   $952,474   $1,384,975 
Capitalized to exploration and evaluation assets   63,921    71,477    135,398 
   $496,422   $1,023,951   $1,520,373 

 

Six months ended June 30, 2025  Short term compensation   Share-based compensation   Total 
Expensed to the statement of income (loss) and comprehensive income  $867,464   $2,612,468   $3,479,932 
Capitalized to exploration and evaluation assets   128,244    201,739    329,983 
   $995,708   $2,814,207   $3,809,915 

 

 29 

 

 

ISOENERGY LTD.

For the three and six months ended June 30, 2025 and 2024

 

Three months ended June 30, 2024  Short term compensation   Share-based compensation   Total 
Expensed to the statement of income (loss) and comprehensive income  $499,355   $856,382   $1,355,737 
Capitalized to exploration and evaluation assets   28,582    90,518    119,100 
   $527,937   $946,900   $1,474,837 

 

Six months ended June 30, 2024  Short term compensation   Share-based compensation   Total 
Expensed to the statement of income (loss) and comprehensive income  $898,180   $1,673,388   $2,571,568 
Capitalized to exploration and evaluation assets   153,192    144,892    298,084 
   $1,051,372   $1,818,280   $2,869,652 

 

As of June 30, 2025:

 

·$39,878 (December 31, 2024: $1,120,402) was included in accounts payable and accrued liabilities owed to related parties and directors and officers; and
·$130,956 (December 31, 2024: $99,449) due from related companies was included in accounts receivable.

 

During the six months ended June 30, 2025, the Company:

 

·reimbursed NexGen $5,540 (2024: $16,016) for use of NexGen’s office space; and
·received $20,539 (2024: $8,502) from Premier American Uranium primarily as reimbursement for salaries (2024: Latitude Uranium Inc. (acquired by Atha Energy in 2024) and Green Shift for equipment rentals and as reimbursement for office expenses and salaries).

 

On February 9, 2024, NexGen’s shareholding in the Company was diluted from 33.8% to 33.1% as a result of the issuance of 920,000 flow through common shares(1) of the Company pursuant to the February 2024 Private Placement, in which NexGen did not participate. On January 19, 2025, NexGen’s shareholding was reduced to 31.8% as a result of the issuance of common shares on the conversion of US$3,000,000 of principal of 2020 Debentures. Concurrent with the February 2025 Flow-Through Financing, NexGen’s shareholding in the Company was maintained at 31.8% as a result of subscribing to 625,000 common shares(1) of the Company as part of the Concurrent Private Placement. NexGen’s shareholding in the Company was diluted from 31.8% to 30.9% as a result of the Bought Deal Financing, of which NexGen purchased 1,200,000 common shares.

 

(1)  Common shares issued are retroactively restated on a post-consolidation basis. Refer to the discussion on the Share Consolidation, as described above in “About IsoEnergy”.

 

 30 

 

 

ISOENERGY LTD.

For the three and six months ended June 30, 2025 and 2024

 

CRITICAL ACCOUNTING JUDGMENTS, ESTIMATES AND ASSUMPTIONS

 

The preparation of the Interim Financial Statements requires management to make judgments, estimates and assumptions that affect the reported amounts of assets, liabilities, and contingent liabilities at the date of the Interim Financial Statements and the reported amounts of revenues and expenses during the reporting period. Estimates and assumptions are continuously evaluated and are based on management’s experience and other factors, including expectations of future events that are believed to be reasonable in the circumstances. Uncertainty about these judgments, estimates and assumptions could result in outcomes that require a material adjustment to the carrying amount of the asset or liability affected in future periods. Information about significant areas of judgement, estimation uncertainty and assumptions considered by management in preparing the Interim Financial Statements are the same as described in the Annual Financial Statements.

 

CHANGES IN ACCOUNTING POLICIES INCLUDING INITIAL ADOPTION

 

The Interim Financial Statements were prepared in accordance with IAS 34 and its interpretations adopted by the IASB and follow the same accounting policies and methods as described in the Annual Financial Statements, including the adoption of the following accounting policy amendment as required.

 

Amendment to IAS 21 – Lack of exchangeability

 

The IASB has issued an amendment to IAS 21 – The Effects of Changes in Foreign Exchange Rates when one foreign currency cannot be exchanged into another. This may occur because of government-imposed controls on capital imports or exports, or a limitation on the volume of foreign currency transactions that can be undertaken at an official exchange rate. The amendment clarifies when a currency is considered exchangeable into another currency and how an entity estimates a spot rate for currencies that lack exchangeability. The amendment is effective for annual reporting periods beginning on or after January 1, 2025, with early adoption permitted.

 

The Company adopted this amendment on January 1, 2025 as required. There were no changes to the Interim Financial Statements from adopting this amendment.

 

CAPITAL MANAGEMENT AND RESOURCES

 

The Company manages its capital structure, defined as total equity plus debt, and adjusts it, based on the funds available to the Company, in order to support the acquisition, exploration and evaluation of assets. The Board does not impose quantitative return on capital criteria for management, but rather relies on the expertise of the Company’s management to sustain the future development of the business.

 

In the management of capital, the Company considers all types of funding alternatives, including equity, debt and other means and is dependent on third party financing. Although the Company has been successful in raising funds to date, there is no assurance that the Company will be successful in obtaining required financing in the future or that such financing will be available on terms acceptable to the Company.

 

The properties in which the Company currently has an interest are in the exploration and development stage. As such the Company, has historically relied on the equity markets to fund its activities. The Company will continue to assess new properties and seek to acquire an interest in additional properties if it determines that there is sufficient geologic or economic potential and if it has adequate financial resources to do so.

 

Management reviews its capital management approach on an on-going basis and believes that this approach, given the relative size of the Company, is reasonable. The Company is not subject to externally imposed capital requirements. There were no changes in the Company’s approach to capital management during the period.

 

 31 

 

 

ISOENERGY LTD.

For the three and six months ended June 30, 2025 and 2024

 

FINANCIAL INSTRUMENTS

 

The Company’s financial instruments consist of cash and cash equivalents, accounts receivable, marketable securities, accounts payable and accrued liabilities, and convertible debentures.

 

Fair Value Measurement

 

The Company classifies the fair value of financial instruments according to the following hierarchy based on the amount of observable inputs used to value the instrument:

 

·Level 1 – quoted prices in active markets for identical assets or liabilities.

 

·Level 2 – inputs other than quoted prices included in Level 1 that are observable for the asset or liability, either directly (i.e. as prices) or indirectly (i.e. derived from prices).

 

·Level 3 – inputs for the asset or liability that are not based on observable market data.

 

The fair values of the Company’s cash and cash equivalents, accounts receivable, and accounts payable and accrued liabilities approximate their carrying value, due to their short-term maturities or liquidity.

 

The Debentures are re-measured at fair value at each reporting date with any change in fair value recognized in profit or loss, except for the change in fair value that is attributable to change in credit risk, which is presented in other comprehensive income (loss). The Debentures are classified as Level 2.

 

The marketable securities are re-measured at fair value at each reporting date with any change in fair value recognized in other comprehensive income (loss). The common shares included in marketable securities are Level 1, except for the common shares of Jaguar Uranium and Royal Uranium, which are Level 3 and their fair value is primarily based on the price of their most recent share issuances. The warrants included in marketable securities are Level 2.

 

Financial instrument risk exposure

 

As of June 30, 2025, the Company’s financial instrument risk exposure and the impact thereof on the Company’s financial instruments are summarized below:

 

(a)Credit Risk

 

Credit risk is the risk that one party to a financial instrument will fail to discharge an obligation and cause the other party to incur a financial loss. As at June 30, 2025, the Company has cash on deposit and cash equivalents with large banks in Canada, the United States, and Australia. Credit risk is concentrated as a significant amount of the Company’s cash and cash equivalents is held at one financial institution. Management believes the risk of loss to be remote.

 

The Company’s accounts receivable mostly consists of input tax credits receivable from the Governments of Canada and Australia and amounts receivable from related parties. Accordingly, the Company does not believe it is subject to significant credit risk. The Company’s loan receivable from Anfield Energy includes interest receivable and was repaid in its entirety during the six months ended June 30, 2025.

 

(b) Liquidity Risk

 

Liquidity risk is the risk that an entity will encounter difficulty in raising funds to meet its obligations under financial instruments. The Company manages liquidity risk by maintaining sufficient cash balances that are accessible on deposit or on short-term notice. Liquidity requirements are managed based on expected cash flows to ensure that there is sufficient capital to meet short-term obligations. As at June 30, 2025, the Company had an adjusted working capital balance of $124,922,827, including cash and cash equivalents of $84,666,913.

 

 32 

 

 

ISOENERGY LTD.

For the three and six months ended June 30, 2025 and 2024

 

(c) Market Risk

 

Market risk is the risk of loss that may arise from changes in market factors such as interest rates, foreign exchange rates and commodity and equity prices.

 

(i)Interest Rate Risk

 

Interest rate risk is the risk that the future cash flows from a financial instrument will fluctuate due to changes in market interest rates. The Company holds its cash and cash equivalents in bank accounts that earn variable interest rates. Due to the short-term nature of these financial instruments, fluctuations in market rates do not have a significant impact on the estimated fair value of the Company’s cash and cash equivalent balances as of June 30, 2025. The interest on the Debentures is fixed and not subject to market fluctuations.

 

(ii)Foreign Currency Risk

 

The functional currency of the Company is the Canadian dollar. Certain of the Company’s subsidiaries use the US dollar and Australian dollar as functional currencies. The Company is affected by currency transaction risk and currency translation risk. Consequently, fluctuations of the Canadian dollar in relation to other currencies impact the fair value of financial assets, liabilities and operating results. Financial assets and liabilities subject to currency translation risk primarily include US dollar and Australian dollar denominated cash, US dollar and Australian dollar accounts receivable, US dollar and Australian dollar marketable securities, US dollar and Australian dollar accounts payable and accrued liabilities, and the Debentures. The Company maintains Canadian, US and Australian dollar bank accounts.

 

The Company is exposed to foreign exchange risk on its US dollar denominated cash, accounts payable and accrued liabilities, accounts receivable, marketable securities and Debentures. At its respective maturity dates, the principal amounts of the Debentures are due in full, and prior to then at a premium upon the occurrence of certain events, including a change of control. The Company holds sufficient US dollars to make all cash interest payments due under the Debentures until maturity but not to pay the principal amount. Accordingly, the Company is subject to risks associated with fluctuations in the Canadian/US dollar exchange rate that may make the Debentures more costly to repay.

 

A 5% change in the US dollar exchange rate can result in a net increase or decrease in the Company’s US dollar-based cash, accounts receivable, marketable securities, accounts payable and accrued liabilities, and Debentures of $28,817 that would flow through the consolidated statement of income (loss) and comprehensive income.

 

The Company is also exposed to foreign exchange risk on its Australian dollar denominated cash, accounts receivable, marketable securities, and accounts payable and accrued liabilities. Accordingly, the Company is subject to risks associated with fluctuations in the Canadian/Australian dollar exchange rate that may impact on its operating results.

 

A 5% change in the Australian dollar can increase or decrease the value of the Company’s Australian dollar-based cash, accounts receivable, marketable securities, and accounts payable and accrued liabilities and accounts receivable by $58,867 that would flow through consolidated statement of income (loss) and comprehensive income.

 

 33 

 

 

ISOENERGY LTD.

For the three and six months ended June 30, 2025 and 2024

 

(iii)Price Risk

 

The Company is exposed to price risk with respect to commodity and equity prices. Equity price risk is defined as the potential adverse impact of movements in individual equity prices or general movements in the level of the stock market on the Company’s financial performance. Commodity price risk is defined as the potential adverse impact of commodity price movements and volatilities on financial performance and economic value. Future declines in commodity prices may impact the valuation of long-lived assets. The Company closely monitors the commodity prices of uranium, individual equity movements, and the stock market. The Company holds marketable securities which are subject to equity price risk.

 

RISK FACTORS

 

The operations of the Company are speculative due to the high-risk nature of its business which is the exploration and development of mineral properties.

 

Regulatory Factors and International Trade Restrictions

 

The international uranium industry, including the supply of uranium concentrates, is relatively small, highly competitive and heavily regulated. Worldwide demand for uranium is directly tied to the demand for electricity produced by the nuclear power industry, which is also subject to extensive government regulation and policies. The development of mines and related facilities is contingent upon governmental approvals that are complex and time consuming to obtain and which, depending upon the location of the project, involve multiple governmental agencies. The duration and success of such approvals are subject to many variables outside of the Company’s control. Any significant delays in obtaining or renewing such permits or licences in the future could have a material adverse effect on the Company.

 

In addition, the international marketing and trade of uranium is subject to potential changes in governmental policies, regulatory requirements and international trade restrictions (including trade agreements, customs, duties and taxes), which are beyond the control of the Company. Changes in regulatory requirements, customs, duties or taxes may affect the supply of uranium to the United States and Europe, which are currently the largest consumption markets for uranium in the world, as well as the future of supply to developing  markets, such as China and India.

 

In particular, pursuant to an executive order, the United States has recently enacted significant new import tariffs on trade and transactions with Canada and other trading partners.  Canada has announced proposed retaliatory import tariffs on trade and transactions from the United States. There is significant uncertainty surrounding further changes in governmental policy, particularly with respect to such trade policies, treaties and tariffs.  These developments, and any similar further changes in governmental policy, may have a material adverse effect on global economic conditions and financial markets. The full economic impact of any such changes in governmental policy on the Company remains uncertain and is dependent on the severity and duration of the tariffs and any other measures imposed which, if prolonged, could increase costs and decrease demand for any minerals that may be extracted by the Company.

 

For a comprehensive list of the risks and uncertainties facing the Company, please see “Risk Factors” in the Company’s AIF and the “Industry and Economic Factors that May Affect the Business” included above in the Overall Performance section of this MD&A. These are not the only risks and uncertainties that the Company faces. Additional risks and uncertainties not presently known to the Company or that the Company currently considers immaterial may also impair its business operations. These risk factors could materially affect the Company's future operating results and could cause actual events to differ materially from those described in forward-looking statements relating to the Company. Further risk factors are discussed in more detail in the Company’s AIF.

 

 34 

 

 

ISOENERGY LTD.

For the three and six months ended June 30, 2025 and 2024

 

SEGMENT INFORMATION

 

The Company has one operating segment, being the acquisition, exploration and development of uranium properties. The Company’s non-current assets are in three countries: Canada, the United States and Australia, with the corporate office in Canada. The geographic segmented disclosure of the Company’s financial information is as follows. Certain comparative amounts for the prior period have been reclassified to conform to the current period’s presentation.

 

As at June 30, 2025  Canada   United States   Australia   Total 
Current assets  $127,520,008   $826,365   $145,352   $128,491,725 
Property and equipment   836,419    14,865,478    -    15,701,897 
Exploration and evaluation assets   102,467,860    135,302,057    26,060,925    263,830,842 
Other non-current assets   -    2,193,604    412,742    2,606,346 
Total assets  $230,824,287   $153,187,504   $26,619,019   $410,630,810 
Total liabilities  $27,959,856   $1,751,842   $681,713   $30,393,411 

 

As at December 31, 2024  Canada   United States   Australia   Total 
Current assets  $59,282,638   $193,709   $110,056   $59,586,403 
Property and equipment   689,410    15,542,892    -    16,232,302 
Exploration and evaluation assets   95,738,413    141,027,791    25,524,894    262,291,098 
Other non-current assets   -    2,314,201    411,019    2,725,220 
Total assets  $155,710,461   $159,078,593   $26,045,969   $340,835,023 
Total liabilities  $35,220,994   $1,837,525   $613,345   $37,671,864 

 

Three months ended June 30, 2025  Canada   United States   Australia   Total 
Share-based compensation  $1,084,648   $-   $16,749   $1,101,397 
Administrative salaries, contractor and director fees   745,685    26,533    16,580    788,798 
Investor relations   302,131    -    -    302,131 
Office and administrative   252,355    34,193    6,909    293,457 
Professional and consultant fees   774,975    114,684    -    889,659 
Travel   97,594    3,814    (11,116)   90,292 
Public company costs   480,127    -    -    480,127 
Total general and administrative expenditure  $3,737,515   $179,224   $29,122   $3,945,861 

 

Six months ended June 30, 2025  Canada   United States   Australia   Total 
Share-based compensation  $3,001,688   $-   $45,548   $3,047,236 
Administrative salaries, contractor and director fees   1,483,117    67,607    33,388    1,584,112 
Investor relations   523,087    -    -    523,087 
Office and administrative   466,432    55,835    15,190    537,457 
Professional and consultant fees   1,770,457    180,013    -    1,950,470 
Travel   262,503    3,814    -    266,317 
Public company costs   625,853    -    -    625,853 
Total general and administrative expenditure  $8,133,137   $307,269   $94,126   $8,534,532 

 

 35 

 

 

ISOENERGY LTD.

For the three and six months ended June 30, 2025 and 2024

 

Three months ended June 30, 2024  Canada   United States   Australia   Total 
Share-based compensation  $1,033,202   $-   $21,594   $1,054,796 
Administrative salaries, contractor and director fees   755,559    17,469    29,050    802,078 
Investor relations   244,021    -    -    244,021 
Office and administrative   152,732    24,088    7,704    184,524 
Professional and consultant fees   611,276    90,564    -    701,840 
Travel   116,108    -    1,578    117,686 
Public company costs   94,788    -    -    94,788 
Total general and administrative expenditure  $3,007,686   $132,121   $59,926   $3,199,733 

 

Six months ended June 30, 2024  Canada   United States   Australia   Total 
Share-based compensation  $2,188,137   $-   $43,188   $2,231,325 
Administrative salaries, contractor and director fees   1,794,697    37,222    41,196    1,873,115 
Investor relations   450,660    -    -    450,660 
Office and administrative   319,671    69,335    16,979    405,985 
Professional and consultant fees   1,101,572    259,140    -    1,360,712 
Travel   259,900    -    3,850    263,750 
Public company costs   260,954    -    -    260,954 
Total general and administrative expenditure  $6,375,591   $365,697   $105,213   $6,846,501 

 

The Company disposed of all net assets in the Argentina reporting segment in the year ended December 31, 2024. All income and expenses associated with the Argentina reporting segment are classified as discontinued operations. Results for the comparative period include:

 

   Three months ended
June 30, 2024
  

Six months ended

June 30, 2024

 
Office and administrative expenses  $55,133   $89,443 
Professional and consultant fees   -    37,056 
Loss from discontinued operations  $(55,133)  $(126,499)

 

DISCLOSURE CONTROLS AND INTERNAL CONTROL OVER FINANCIAL REPORTING

 

Disclosure Controls and Procedures

 

Disclosure controls and procedures are designed to provide reasonable assurance that material information is gathered and reported to management, including the Chief Executive Officer (“CEO”) and Chief Financial Officer (“CFO”), as appropriate to allow for timely decisions about public disclosures. The Company’s management, with the participation of its CEO and CFO, has evaluated the effectiveness of the design and operation of the Company’s disclosure controls and procedures, as defined in the rules of the US Securities and Exchange Commission and Canadian Securities Administrators. Based on the results of that evaluation, the Company’s CEO and CFO have concluded that, as of June 30, 2025, the Company’s disclosure controls and procedures framework provides reasonable assurance that the information required to be disclosed by the Company in reports it files is recorded, processed, summarized and reported, within the appropriate time periods and is accumulated and communicated to management, including the CEO and CFO, as appropriate to allow timely decisions regarding required information to be disclosed. Internal control over financial reporting are part of disclosure controls and procedures as they related to the production of financial statements in accordance with IFRS.

 

 36 

 

 

ISOENERGY LTD.

For the three and six months ended June 30, 2025 and 2024

 

Changes in Internal Control over Financial Reporting

 

Management, including the CEO and CFO, has evaluated the Company’s internal controls over financial reporting to determine whether any changes occurred during the period that have materially affected, or are reasonably likely to materially affect, the Company’s internal controls over financial reporting. During the six months ended June 30, 2025 there have been no significant changes in internal control over financial reporting that have materially affected, or are reasonably likely to materially affect, the Company’s internal control over financial reporting. Under the supervision and with the participation of management, including the CEO and CFO, management will continue to monitor and evaluate the design and effectiveness of its internal controls over financial reporting and disclosure controls and procedures, and may make modifications from time to time as considered necessary.

 

Limitations of Controls and Procedures

 

The Company’s management, including the CEO and CFO, believe that any control system, no matter how well conceived and operated, can provide only reasonable, not absolute, assurance that the objectives of the control system are met. Further, the design of a control system must reflect the fact that there are resource constraints, and the benefits of controls must be considered relative to their costs. Because of the inherent limitations in all control systems, they cannot provide absolute assurance that all control issues and instances of fraud, if any, within the Company have been prevented or detected. These inherent limitations include the realities that judgments in decision-making can be faulty, and that breakdowns can occur because of simple error or mistake. Additionally, controls can be circumvented by the individual acts of some persons, by collusion of two or more people, or by unauthorized override of the control. The design of any systems of controls also is based in part upon certain assumptions about the likelihood of future events, and there can be no assurance that any design will succeed in achieving its stated goals under all potential future conditions. Accordingly, because of the inherent limitations in a cost-effective control system, misstatements due to error or fraud may occur and not be detected.

 

 37 

 

 

ISOENERGY LTD.

For the three and six months ended June 30, 2025 and 2024

 

NOTE REGARDING FORWARD-LOOKING INFORMATION

 

This MD&A contains “forward-looking statements” (also referred to as “forward-looking information”) within the meaning of applicable Canadian securities legislation and US securities laws. “Forward-looking information” includes, but is not limited to, statements with respect to the activities, events or developments that the Company expects or anticipates will or may occur in the future, including, without limitation, the potential issuance of additional securities under the Company’s base shelf prospectus or otherwise, certain statements relating to “flow-through shares” as defined in the Tax Act, and the tax considerations relating thereto, the Company’s planned exploration and development activities and the anticipated results of ongoing and future exploration and development activities; capital expenditures and proposed work programs at the Company’s properties, the potential for, success of and anticipated timing of commencement of future commercial production at IsoEnergy’s properties, including expectations with respect to any permitting, development or other work that may be required to bring any of the projects into development or production. Generally, but not always, forward-looking information and statements can be identified by the use of words such as “plans”, “expects”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes” or the negative connotation thereof or variations of such words and phrases or state that certain actions, events or results “may”, “could”, “would”, “might” or “will be taken”, “occur” or “be achieved” or the negative connotation thereof. Statements relating to “mineral resources” may also be deemed forward-looking information as they involve estimates of the mineralization that will be encountered if a mineral deposit is developed and mined.

 

Such forward-looking information and statements are based on numerous assumptions, including material assumptions and estimates related to the below factors that, while the Company considers them reasonable as of the date of this MD&A, they are inherently subject to significant business, economic and competitive uncertainties and contingencies. Such assumptions include among others, that the results of planned exploration activities are completed as anticipated, that the results of the planned exploration activities are as anticipated, that the anticipated cost of planned exploration activities are as anticipated, that the Company will be able to execute its strategy as expected, that new mining techniques will have beneficial applications as expected and be available for use by the Company, continued engagement and collaboration with the communities and stakeholders, that general business and economic conditions will not change in a material adverse manner, including the price of uranium, that financing will be available if and when needed and on reasonable terms, and that third party contractors, equipment and supplies and governmental and other approvals required to conduct the Company’s planned exploration activities will be available on reasonable terms and in a timely manner. Although the assumptions made by the Company in providing forward-looking information or making forward-looking statements are considered reasonable by management at the time, there can be no assurance that such assumptions will prove to be accurate.

 

Forward-looking information and statements also involve known and unknown risks and uncertainties and other factors, which may cause actual events or results in future periods to differ materially from any projections of future events or results expressed or implied by such forward-looking information or statements, including, among others: negative operating cash flow and dependence on third party financing, uncertainty of additional financing, risks associated with the uncertainty of exploration results and estimates and that the mineral resource potential will be achieved on exploration projects, the Company having no known mineral reserves, resources may not be converted to reserves, the limited operating history of the Company, the influence of a large shareholder, alternative sources of energy and uranium prices, aboriginal title and consultation issues, reliance on key management and other personnel, actual results of exploration activities being different than anticipated, changes in exploration programs based upon results, availability of third party contractors, availability of equipment and supplies, failure of equipment to operate as anticipated; accidents, effects of weather and other natural phenomena and other risks associated with the mineral exploration industry, environmental risks, changes in laws and regulations, community relations and delays in obtaining governmental or other approvals and the risk factors with respect to the Company set out in the AIF and the Company’s other filings with the Canadian and US securities regulators and available under IsoEnergy’s profile on SEDAR+ at www.sedarplus.ca and EDGAR at www.sec.gov.

 

 38 

 

 

ISOENERGY LTD.

For the three and six months ended June 30, 2025 and 2024

 

Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information or implied by forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking information and statements will prove to be accurate, as actual results and future events could differ materially from those anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information.  The Company undertakes no obligation to update or reissue forward-looking information as a result of new information or events except as required by applicable securities laws.

 

HISTORICAL ESTIMATES

 

Each of the mineral resource estimates contained in this MD&A, except for the Larocque East Project and Tony M Mine, are considered to be “historical estimates” as defined under NI 43-101, and have been sourced as follows:

 

·Daneros Mine: Reported by Energy Fuels in a technical report entitled “Updated Report on the Daneros Mine Project, San Juan County, Utah, U.S.A.”, prepared by Douglas C. Peters, C. P. G., of Peters Geosciences, dated March 2, 2018;
·Sage Plain Project: Reported by Energy Fuels in a technical report entitled “Updated Technical Report on Sage Plain Project (Including the Calliham Mine)”, prepared by Douglas C. Peters, CPG of Peters Geosciences, dated March 18, 2015;
·Coles Hill: Reported by Virginia Uranium Holdings Inc. in a technical report entitled “NI43-101 preliminary economic assessment update (revised)”, prepared by John I Kyle of Lyntek Incorporated dated Agust 19, 2013;
·Dieter Lake: Dated 2006 and reported by Fission Energy Corp. in a company report entitled “Technical Report on the Dieter Lake Property, Quebec, Canada” dated October 7, 2011;
·Matoush: Dated December 7, 2012 and reported by Strateco Resources Inc. in a press release dated December 7, 2012;
·Ben Lomond: Dated as of 1982, and reported by Mega Uranium Ltd. in a company report entitled “Technical Report on the Mining Leases Covering the Ben Lomond Uranium-Molybdenum Deposit Queensland, Australia” dated July 16, 2005; and
·Milo Project: Reported by Gmb Resources Ltd. in a scoping study entitled “Milo Project Scoping Study” prepared by Peter Owens and Basile Dean of Mining One Consultants, dated March 6, 2013.

 

In each instance, the historical estimate is reported using the categories of mineral resources and mineral reserves as defined by the Canadian Institute CIM Definition Standards for Mineral Reserves, and mineral reserves at that time, and these “historical estimates” are not considered by IsoEnergy to be current. In each instance, the reliability of the historical estimate is considered reasonable, but a Qualified Person has not done sufficient work to classify the historical estimate as a current mineral resource, and IsoEnergy is not treating the historical estimate as a current mineral resource. The historical information provides an indication of the exploration potential of the properties but may not be representative of expected results.

 

For the Daneros Mine, as disclosed in the above noted technical report, the historical estimate was prepared by Energy Fuels using a wireframe model of the mineralized zone based on an outside bound of a 0.05% eU3O8 grade cutoff at a minimum thickness of 1 foot. Surface drilling would need to be conducted to confirm resources and connectivity of resources in order to verify the Daneros historical estimate as a current mineral resource.

 

 39 

 

 

ISOENERGY LTD.

For the three and six months ended June 30, 2025 and 2024

 

For the Sage Plain Project, as disclosed in the above noted technical report, the historical estimate was prepared by Peters Geosciences using a modified polygonal method. An exploration program would need to be conducted, including twinning of historical drill holes, in order to verify the Sage Plain historical estimate as a current mineral resource.

 

For the Coles Hill Project, as disclosed in the above noted revised preliminary economic assessment, the historical estimated was prepared by John I Kyle of Lyntek Incorporated. Twinning of a selection of certain holes would need to be completed along with updating of mining, processing and certain cost estimates in order to verify the Coles Hill Project historical resource estimate as a current mineral resource estimate.

 

For Dieter Lake, as disclosed in the above noted technical report, the historical estimate was prepared by Davis & Guo using the Thiessen (Voronoi) polygon method. Data constraints used were 200 ppm, 500 ppm, and 1000ppm U3O8 over a minimum of 1 metre thickness. Polygons created had radii of 200 metres. A rock density of 2.67g/cm3 was used. An exploration program would need to be completed, including twinning of historical drill holes, in order to verify the Dieter Lake historical estimate as a current mineral resource.

 

For Matoush, as disclosed in the above noted press release, the historical estimate was prepared by RPA using block U3O8 grades within a wireframe model that were estimated by ordinary kriging. The historical estimate was estimated at a cut-off grade of 0.1% U3O8 and using an average long-term uranium price of US$75 per pound. Six zones make up the historical estimate at Matoush: am-15, mt-34, mt-22, mt-02, mt-06, and mt-36. Each zone is made up of one or more lenses, most of which strike north (009°) and dip steeply (87°) to the east. Outlines of the mineralized lenses were interpreted on ten-metre spaced vertical sections. Minimum criteria of 0.10% U3O8 over 1.5 metre true thickness was used as a guide. An exploration program would need to be conducted, including twinning of historical drill holes, in order to verify the Matoush historical estimate as a current mineral resource.

 

For Ben Lomond, as disclosed in the above noted technical report, the historical estimate was prepared by the Australian Atomic Energy Commission (AAEC) using a sectional method. The parameters used in the selection of the ore intervals were a minimum true thickness of 0.5 metres and maximum included waste (true thickness) of 5 metres. Resource zones were outlined on 25 metre sections using groups of intersections, isolated intersections were not included. The grades from the composites were area weighted to give the average grade above a threshold of 500 ppm uranium. The area was measured on each 25 metre section to give the tonnage at a bulk density of 2.603. An exploration program would need to be conducted, including twinning of historical drill holes, in order to verify the Ben Lomond historical estimate as a current mineral resource.

 

For the Milo Project, as disclosed in the above noted scoping study, the historical estimate was prepared by Peter Owens and Basile Dean of Mining One Consultants. An exploration program would need to be conducted, including twinning of a selection of certain holes, along with updating of mining processing and certain cost estimates in order to verify the Milo Project historical resource estimate as a current mineral resource estimate.

 

APPROVAL

 

The Audit Committee and the Board of IsoEnergy have approved the disclosure contained in this MD&A. A copy of this MD&A will be provided to anyone who requests it and can be located, along with additional information, on the Company’s profile on SEDAR+ at www.sedarplus.ca, on EDGAR at www.sec.gov, or by contacting one of the corporate offices, located at Suite 900 – 410 22nd Street E, Saskatoon, Saskatchewan, S7K 5T6 and 217 Queen St. West, Suite 303, Toronto, Ontario, M5V 0P5.

 