XML 41 R29.htm IDEA: XBRL DOCUMENT v3.25.1
Other Assets (Tables)
3 Months Ended
Mar. 31, 2025
Deferred Costs, Capitalized, Prepaid, and Other Assets Disclosure [Abstract]  
Schedule of Other Assets

 

March 31,
2025

 

 

December 31,
2024

 

Operating lease right-of-use assets

 

$

3,206

 

 

$

3,458

 

Prepaid construction costs

 

 

3,915

 

 

 

-

 

Prepaid insurance, Thacker Pass

 

 

11,713

 

 

 

-

 

Deposits on long-lead equipment

 

 

60,553

 

 

 

24,394

 

Total

 

$

79,387

 

 

$

27,852