TECHNICAL REPORT SUMMARY

 

 

CSA COPPER MINE – NEW SOUTH WALES – AUSTRALIA

 

 

 

 

S-K 1300 REPORT PREPARED FOR

METALS ACQUISITION LIMITED

 

 

 

 

BEHRE DOLBEAR AUSTRALIA PTY LIMITED

 

 

22 April 2024

 

 

 

 

Denver New York Toronto London Sydney

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 2

 

 

DATE AND SIGNATURE PAGE

 

This Technical Report Summary was prepared by Behre Dolbear Australia Pty Limited for Metals Acquisition Limited (“MAC”). Mr. Mike Job of Cube Consulting Pty Limited, West Perth, acted as Qualified Person (“QP”) for the Mineral Resource estimate and Mr. Jan Coetzee of MAC acted as Qualified Person for the Mineral Reserve estimate.

 

The contributes of each group to this Technical Report Summary is shown in the table below.

 

Consulting Group Author Sections Signature
Behre Dolbear Australia Mark Faul 1, 2, 3, 4, 5, 13, 16, 18, 19, 20, 21, 22, 23, 24, 25 Signed
Malcolm Hancock 6 Signed
Joe Pease 10, 14 Signed
Richard Frew 15 Signed
Adrian Brett 17 Signed
Cube Consulting Mike Job 7, 8, 9 and 11 Signed
Metals Acquisition Corp. Jan Coetzee 12 Signed

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 3

 

 

TABLE OF CONTENTS

 

Glossary of Terms and Abbreviations 10
       
1 Executive Summary 11
1.1 Summary 11
1.2 Property Description, Ownership and Mineral Rights 11
1.3 Accessibility, Climate, Local Resources,Infrastructure and Physiography 11
1.4 History 14
1.5 Geological Setting, Mineralization and Deposit 14
1.6 Exploration 14
1.7 Sample Preparation, Analysis and Security 14
1.8 Data Verification 14
1.9 Mineral Processing and Metallurgical Testing 16
1.10 Mineral Resource Estimates 16
1.11 Mineral Reserve Estimate 16
1.12 Mining Methods 17
1.13 Processing and Recovery Methods 18
1.14 Infrastructure 18
1.15 Market Studies 19
1.16 Environmental Studies, Permitting and Plans, Negotiations or Agreements 19
1.17 Capital and Operating Costs 20
1.18 Economic Analysis 20
1.19 Qualified Persons’ Opinion on Conclusions and Recommendations 21
2 Introduction 22
2.1 Registrant 22
2.2 Lead Author – Behre Dolbear Australia (BDA) 22
2.3 Terms of Reference 22
2.4 Qualified Persons 22
2.5 Site Visits and Scope of Personal Inspection 25
2.6 Information Sources 25
2.7 Previous Reports on the Project 25
3 Property Description 26
3.1 Property Location 26
3.2 Property and Title in Australia 26
3.3 Mineral Title in New South Wales 26
3.4 Mineral Titles, Claims, Rights, Leases and Options 27
3.5 Significant Factors and Risks That May Affect Access, Title or Right to Perform Work 30

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 4

 

 

       
4 Accessibility, climate, local resources, infrastructure, physiography 31
4.1 Topography, Elevation and Vegetation 31
4.2 Accessibility 31
4.3 Climate 31
4.4 Infrastructure 31
5 History 34
5.1 Previous Operations 34
5.2 Recent Production History 34
5.3 Historical Exploration 34
6 Geological Setting, Mineralization and Deposit 36
6.1 Regional Geology and Mineral Deposits 36
6.2 Stratigraphy 36
6.3 Local and Property Geology 38
6.4 Mineralization and Alteration 39
7 Exploration 41
7.1 Historical and Current Drilling 41
7.2 Exploration – Non-Drilling 41
7.3 Exploration – Drilling 45
7.4 Underground Drilling 49
7.5 Geotechnical Data 52
7.6 Hydrological Data 52
7.7 Qualified Person’s Opinion on Exploration Interpretations 52
8 Sample preparation, analySes and security 53
8.1 Assay Sample Preparation and Analysis 53
8.2 Bulk Density Determinations 53
8.3 Quality Assurance and Quality Control 53
8.4 Security and Storage 54
8.5 Qualified Person’s Opinion on Sample Preparation, Security and Analytical Procedures 54
9 Data Verification 55
9.1 Internal Data Verification 55
9.2 Review of CMPL’s QA/QC 55
9.3 Geological and Operation Reconciliation 55
9.4 Qualified Person’s Opinion on Data Adequacy 55
10 Mineral Processing and Metallurgical Testing 56
10.1 Overview of Metallurgical Testing Practices 56
10.2 Data Analysis and Regression Modelling 56
10.3 Planning and Forecasting 57
10.4 Deleterious Elements 57
10.5 Test Laboratories 57
10.6 Mine Metallurgical Test Work on Future Orebodies Study – JKTech 2020 58

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 5

 

 

10.7 Comminution 58
10.8 Recovery and Concentrate Estimates 59
10.9 Qualified Person’s Opinion on Mineral Processing and Metallurgical Testing 59
11 Mineral Resource Estimate 60
       
11.1 Introduction 60
11.2 Available Data 60
11.3 Geological Models 61
11.4 Mineralized Domain Coding 61
11.5 Composites 62
11.6 Exploration Data Analysis and Grade Capping/Outlier Restrictions 62
11.7 Variography 62
11.8 Block Model Definition 62
11.9 Estimation/Interpolation Methods 62
11.10 Density Assignment 63
11.11 Validation 65
11.12 Confidence Classification of the Mineral Resource Estimate 65
11.13 Reasonable Prospects of Economic Extraction 65
11.14 Mineral Resource Estimate 67
11.15 Factors that May Affect the Mineral Resource Estimate 68
11.16 Qualified Person’s Opinion on the Mineral Resource Estimate Process 68
12 Mineral Reserve Estimate 69
12.1 Introduction 69
12.2 Development of the Mining Case 69
12.3 Design Guidelines 70
12.4 Modifying Factors 70
12.5 Cut-off Grade and Input Assumptions 70
12.6 Mineral Reserve Estimate 72
12.7 Factors that may affect the Mineral Reserve Estimate 72
12.8 Qualified Person’s Opinion on the Mineral Reserve Estimation Process 73
13 Mining Methods 74
13.1 Introduction 74
13.2 Blasting 77
13.3 Geotechnical Parameters 77
13.4 Backfill 79
13.5 Hydrogeological Parameters 80
13.6 Other Mine Design and Plan Parameters 80
13.7 Mine Schedule 80
13.8 Mining Fleet Requirements 81
13.9 Mine Personnel Requirements 82
13.10 Mine Map 82
13.11 Qualified Person’s Opinion on the Mining Method 82

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 6

 

 

       
14 Processing and Recovery Methods 84
14.1 Introduction 84
14.2 Comminution 84
14.3 Concentrate Product 86
14.4 Tailings 86
14.5 Other Processing Inputs 87
14.6 Qualified Person’s Opinion on Processing and Recovery Methods 87
15 Infrastructure 88
15.1 Access and Ports 88
15.2 Ventilation Infrastructure 88
15.3 Power Supply 89
15.4 Water Supply and Water Pipelines 89
15.5 Tailings Storage Facility 90
15.6 Workforce Accommodation 90
15.7 Site Buildings and Services 90
15.8 Qualified Person’s Opinion on Infrastructure 90
16 Market Studies 91
16.1 Copper Demand 91
16.2 Copper Supply 92
16.3 Copper Supply Outlook 95
16.4 Copper Price Outlook 96
16.5 Silver Demand 96
16.6 Silver Supply 96
16.7 Silver Price Outlook 97
16.8 Commercial Contracts 97
16.9 Product Specifications Requirements 98
17 Environmental Studies, Permitting and Plans 99
17.1 Introduction 99
17.2 Baseline and Supporting Studies - Environmental Management and Reporting System 99
17.3 Permitting 99
17.4 Rehabilitation Management Plan (RMP) 100
17.5 Mine Waste Management 100
17.6 Tailings Disposal 100
17.7 Water Management 100
17.8 Social Considerations, Plans, Negotiations and Agreements 102
17.9 Cultural Heritage 102
17.10 Mine Rehabilitation and Closure Costs 103
17.11 Qualified Person’s Opinion on the Permits, Approvals, Tenements and ESG Aspects 105

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 7

 

 

       
18 Capital and Operating Costs 106
18.1 Capital Costs 106
18.2 Operating Costs 108
18.3 Qualified Person’s Opinion on the Adequacy of Capital and Operating Costs 110
19 Economic Analysis 110
19.1 Forward-looking Information Caution 110
19.2 Principal Assumptions 110
19.3 Results of Economic Analysis 111
19.4 Sensitivity Analysis 112
19.5 Qualified Person’s Opinion on the Economic Analysis 113
20 Adjacent Properties 114
21 Other Relevant Data and Information 114
22 Interpretation and Conclusions 114
22.1 Conclusions 114
22.2 Risks 116
22.3 Risk Mitigation Factors 119
22.4 Opportunities 120
23 Recommendations 121
24 References 122
25 Reliance on Information Provided by the Registrant 123

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 8

 

 

GLOSSARY OF TERMS AND ABBREVIATIONS

 

Term/Abbreviation Description
   
A$ Australian Dollar
AEM Airborne Electromagnetics (survey)
AEMR Annual Environmental Management Report
Ag Silver
ALS Australian Laboratory Services
AMC AMC Consultants Pty Ltd
AMR Airborne Magnetics and Radiometrics (survey)
ANCOLD Australian National Committee on Large Dams
ANFO Ammonium Nitrate/Fuel Oil (explosive)
ARD Acid Rock Drainage
Au Gold
AuriCula AuriCula Mines Pty Limited
Ausenco Ausenco Pty Limited
BBE BBE Consulting (Australasia)
BDA Behre Dolbear Australia Pty Limited
Behre Dolbear Behre Dolbear & Company Inc.
CAGR Compound Annual Growth Rate
CDA Canadian Dam Association
CDI CHESS Depository Interests
CHF Cemented Hydraulic Fill
CIK Categorical Indicator Kriging
CLM Act Crown Land Management Act 2016 (in NSW)
CML Consolidated Mining Lease
CMPL Cobar Management Pty Limited
CPF Cemented Paste Fill
CRA Conzinc RioTinto Australia
CRF Cemented Rock Fill
CSA CSA Copper Mine
CSC Cobar Shire Council
CTD Central Tailings Discharge
Cu Copper
Cube Cube Consulting Pty Limited
DCF Discounted Cash Flow
DHEM Drill Hole Electromagnetic (Survey)
DIDO Drive-in Drive-out
2DIP Two-Dimensional Induced Polarisation
DPIE Department of Planning Infrastructure and Environment (in NSW)
EL Exploration Licence
EM Electromagnetics (survey)
EMP Environmental Management Plan
EMS Environmental Management System
EPA Environmental Protection Agency (in NSW)
EP&A Act Environmental Planning and Assessment Act (in NSW)
EPL Exploration (Prospecting) Licence
EPLs Environmental Protection Licences
FAR Fresh Air Raise
FEL Front End Loader
FIFO Fly-In Fly-Out
FLEM Fixed Loop Electromagnetics (survey)
FOS Factor of Safety
FW Footwall
G&A General and Administration
GAP Gap Geophysics Australia Pty Ltd
Glencore Glencore Public Limited Company
g/t Gram Per Tonne
GRB Glencore Geotechnical Review Board
GRS Geophysical Resources and Services Pty Ltd
GSM Golden Shamrock Mines Pty Limited

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 9

 

 

GLOSSARY – ABBREVIATIONS - CONTINUED

 

Term/Abbreviation Description
   
HW Hangingwall
ha Hectare (10,000m2)
Helix Helix Resources Limited
HPIFR High Potential Injury Frequency Rate
ICP-AES Inductively Coupled Plasma Atomic Emission Spectrometry
IP Induced Polarisation (survey)
ITASCA ITASCA Australia Pty Limited
JK or JK Tech JKTech Pty Ltd
JORC Code Joint Mineral Reserve Committee (Australasian Resource/Reserve Code)
JV Joint Venture
km Kilometer
km2 Square Kilometer
KNA Kriging Neighbourhood Analysis
koz Thousand Troy Ounces
kt Thousand Tonnes
ktpa Thousand Tonnes per Annum
kV Kilovolts
lb Pound
LFB Lachlan Fold Belt
LHD Load-Haul-Dump (Mining Units)
LHOS Long Hole Open Stope
LOA Life of Asset (Resource Estimate or Financial Model)
LOM Life of Mine
LRF Loose Rock Fill
LTIFR Lost Time Injury Frequency Rate
m Meter
m3/s Cubic Meters Per Second
mm Micron
M Million
MAC Metals Acquisition Corporation
mbs Meters Below Surface
MIMDAS M.I.M Distributed Acquisition System
ML Mining Lease
ML/day Megalitres per Day
MLpa Megalitres per annum
MII Measured, Indicated and Inferred (Mineral Resources)
mm Millimeter
MNE May Not Exist (Material in Mining Inventory)
MPa Mega Pascal
MPL Mining Purpose Lease
MRE Mineral Resource Estimate
Mt Million Tonnes
MT Magnetotelluric (survey)
Moz Million Troy Ounces
Mtpa Million Tonnes Per Annum
MVA Megavolt Ampere
MW Megawatt
MWBAC Megawatt Bulk Air Cooling
MWE Megawatt Equivalent
NAF Non-Acid Forming
NC Non-Classified (Material in Mining Inventory)
NIR Not In Reserve (Material in Mining Inventory)
NNE North-Northeast
NNW North-Northwest
NRAR Natural Resource Access Regulator (in NSW)
NSR Net Smelter Return
NSW New South Wales
NTSF Northern Tailings Storage Facility

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 10

 

 

GLOSSARY – ABBREVIATIONS - CONTINUED

 

Term/Abbreviation Description
   
OK Ordinary Kriging
OR Mineral Reserves
OSA On-Stream Analyz
Oxley Oxley Exploration Pty Limited
oz Troy Ounce
P80 80% Passing
PAF Potential Acid Forming
POEO Act Protection of the Environment Operations Act (in NSW)
Q Quarter (year)
QA/QC Quality Assurance/Quality Control
QP Qualified Person
QPE Quattro Project Engineering
QTSC QTS Central (Deposit)
QTSN QTS North (Deposit)
QTSS QTS South (Deposit)
RAB Rotary Air Blast (drilling)
RAR Return Air Raise
RC Reverse Circulation (drilling)
RC Smelter Refining Charges
Report or Technical Report SEC Regulation S-K Technical Report Summary
RL Relative Level
RMP Rehabilitation Management Plan
RQD Rock Quality Designation
SAG Semi-Autogenous Grinding (Mill)
SAP SAP Business Management System
SEC United States Securities and Exchange Commission
S-K Report SEC Regulation S-K Technical Report Summary
SQUID 3-component Supracon High-temperature Super-Conducting Quantum Interference Device (sensor)
STSF Southern Tailings Storage Facility
t Tonne (1,000 Kilograms)
t/m3 Tonnes per Cubic Meter
TC Smelter Treatment Charges
TRS SEC Regulation S-K Technical Report Summary
TRIFR Total Recordable Injury Frequency Rate
TSF Tailings Storage Facility
US$ US Dollar
VDR Virtual Dataroom
WB Wet Bulb (Temperature)
wmt Wet Metric Tonne
XRF X-Ray Fluorescence

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 11

 

 

1Executive Summary

 

1.1Summary

 

Behre Dolbear Australia Pty Limited (“BDA”) was engaged by Metals Acquisition Limited (MAC or the “Company”) to prepare an independent Technical Report Summary (“Technical Report” or the “Report”) on the CSA Copper Mine (“CSA” or the “Project”), located in western New South Wales, 11 kilometers (“km”) northwest of the town of Cobar, Australia (Figure 1).

 

The purpose of this Technical Report is to report the Mineral Reserve Estimate and Mineral Resource Estimate for CSA, both of which have an effective date of August 31st, 2023. This report has an effective date of April 22nd, 2024.

 

This Technical Report Summary conforms to United States Securities and Exchange Commission’s (SEC) Modernized Property Disclosure Requirements for Mining Registrants as described in Subpart 229.1300 of Regulation S-K, Disclosure by Registrants Engaged in Mining Operations and Item 601 (b)(96) Technical Report Summary (collectively “S-K 1300”).

 

1.2Property Description, Ownership and Mineral Rights

 

The CSA Copper Mine is located in western New South Wales, Australia, (latitude 31° 24’ 32.42°S, longitude 145° 48’ 0.20°E), 11km northwest of the town of Cobar and 600km west-northwest of Sydney (Figure 1).

 

Cobar Management Pty Ltd (“CMPL”) is an Australian legal entity and operator of CSA mine. CMPL is the registered owner of all key assets of the mine including property, mineral, fixed and mobile assets used in the operation. CMPL was previously owned by Glencore International AG (“Glencore” or “GIAG”) who, on March 17th, 2022, entered into a binding sale and purchase agreement to sell CMPL to MAC. The acquisition was completed on June 16th, 2023.

 

CMPL holds a Mining Lease (CML5) over the CSA deposit, surrounded by three Exploration Licences (EL5693, EL5983 and EL9587) (Figure 2). CMPL also has joint venture exploration interests in exploration areas to the south of Cobar. CML5 covers an area of approximately 24.7 square kilometers (“km2”), while the surrounding EL5693, EL5983 and EL9587 cover approximately 504km2. Ore is produced principally from two steeply dipping underground mineralised systems, QTS North (“QTSN”) and QTS Central (“QTSC”) from depths generally between 1,500-1,800 meters (“m”) below surface. The current depth of the decline is around 1,900m. CMPL mining operations have historically produced, on average, around 1.1 million tonnes per annum (“Mtpa”) of ore. The underground mine is serviced by two hoisting shafts and a decline. The ore is crushed underground, hoisted to surface, and milled and processed through the CSA concentrator.

 

1.3Accessibility, Climate, Local Resources, Infrastructure and Physiography

 

All-weather access to the CSA mine is provided via sealed highways and public roads, and the mine is linked by rail to the ports of Newcastle and Port Kembla (a suburb of Wollongong) from where the copper concentrate product is exported. Cobar is serviced by a sealed airstrip with commercial flights to and from Sydney.

 

The climate of Cobar is semi-arid with evaporation typically exceeding rainfall by a ratio of 6:1. The mean annual rainfall for Cobar is approximately 400 millimeters (“mm”). During summer months, maximum temperatures typically range between 28-39ºC and during the winter months, maximum temperatures typically range between 13-20ºC. Minimum temperatures in the winter months typically range between 5-9ºC.

 

The project is well served by existing infrastructure which includes power supply, water supply, site buildings, and service facilities. Power is supplied to the site from the state energy network via a 132 kilovolt (“kV”) transmission line.

 

The bulk of the water supply for the operation is provided by the Cobar Water Board from a weir on the Bogan River at Nyngan (Figure 1) through a network of pumps and pipelines. Additional water is available from tailings water recycling, surface water capture, and an installed borefield.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 12

 

 

 

Figure 1LOCATION PLAN
BDA - 0230-04-April 2024Behre Dolbear Australia Pty Ltd

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 13

 

 

 

 

Figure 2CSA MINE TENEMENTS AND JOINT VENTURE TENEMENTS
BDA - 0230-04-April 2024Behre Dolbear Australia Pty Ltd

 

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 14

 

 

1.4History

 

The CSA mine has a long operating history, with copper mineralization first discovered in 1871. Early development commenced in the early 1900s, focussing on near surface mineralization. In 1965, Broken Hill South Limited developed a new mechanized underground mining and processing operation, with new shafts, winders, concentrator, and infrastructure; subsequently, the mine was operated under several different owners, until the property was acquired by GIAG in 1999. The direct owner and operator of the mine is Cobar Management Pty Ltd (CMPL), previously owned by Glencore and acquired by MAC on June 16th, 2023.

 

1.5Geological Setting, Mineralization and Deposit

 

The CSA deposit is located within the Cobar mineral field in the Cobar Basin, a north-south mineralized belt containing copper, gold, and lead-zinc mineralization, with five currently operating mines within 80km of Cobar (Figure 2). Mineralization at the CSA mine is hosted within the Silurian-age CSA Siltstone, a steeply dipping sequence of interbedded siltstones and sandstones. Mineralization is associated with north-south faulting and northwest cross-cutting structures; studies indicate that reactivation of the faults played a significant role in providing fluid pathways for mineralising fluids and dilational zones for the formation of the mineral deposits.

 

The CSA mineralization occurs in five known systems: Eastern, Western, QTS North (QTSN), QTS Central (QTSC) and QTS South (“QTSS”) (Figure 3). Within these systems multiple lenses occur; lenses are typically 5-30m wide, with relatively short strike lengths (<300m) but significant down plunge extent of up to 1000m. Not all the systems extend to surface; QTSN which accounts for the bulk of the current production tonnes is developed from 600m depth while QTSC is developed from a depth of around 1,200m.

 

The dominant copper sulphide is chalcopyrite (CuFeS2); silver is also present as acanthite (Ag2S).

 

1.6Exploration

 

The CSA deposit was discovered in 1871 with a further discovery of copper-rich ore in 1905, however, a slump in metal prices and an underground fire led to the closure of the mine in 1920. Zinc Corp Ltd (through its subsidiary Enterprise Exploration) explored the area from 1947 to 1957 and commenced re-development work in 1952. Cobar Mines Pty Ltd was created in 1956, mining recommenced in 1962 and production commenced in 1965 from the Eastern (Cu-Zn) and Western (Pb-Zn-Ag) System lenses.

 

The QTS System was discovered in the mid-1970s with the QTS North lenses then becoming the main source of the copper ore. CMPL came under the ownership of Conzinc RioTinto of Australia (“CRA”) in 1980, Golden Shamrock Mines (“GSM”) in 1993 and Glencore in 1999. During this time, there were ongoing periods of geochemical and geophysical data acquisition, shallow RC drilling and deeper diamond drilling.

 

The CSA deposit has been drilled using fully cored diamond drill holes drilled either from surface or underground, primarily using NQ size core (47.6mm diameter). The deposits have been defined by over 6,800 holes totalling approximately 1,000km of core. Data from many of the historical drill holes is not used for current resource estimation, being located in the upper mined out levels of the deposit; current resource estimates are based on approximately 2,900 drill holes and more than 71,000 samples. Underground diamond drilling over the last five years has averaged 23,000m per year; over the last two years the average has been 27,700m per year.

 

1.7Sample Preparation, Analysis and Security

 

Sample preparation and assaying is carried out by independent laboratory, Australian Laboratory Services (“ALS”) in Orange, NSW, using an aqua regia digest and the Inductively Coupled Plasma Atomic Emission Spectrometry (“ICP-AES”) analytical method, with analysis for a standard suite of elements including copper, zinc, lead, and silver. Quality Assurance/Quality Control (“QA/QC”) protocols have been comprehensive since 2004 and include insertion of standards (supplied by Ore Research and Exploration Pty Limited), blanks and duplicate samples at a frequency of approximately 1 in 30 samples. CSA monitors QA/QC data; the sampling and assaying data for the main elements are considered reliable and without material bias and sample security arrangements are appropriate and satisfactory.

 

1.8Data Verification

 

Basic database validation checks are carried out by CMPL personnel. These include sample from and to depths, geology, record duplication checks, as well as collar survey and down hole survey checks. Assay certificates are verified against the acQuire database dispatch and laboratory job numbers. Extensive random checks of the digital database are made against hardcopy/pdf format assay certificates and geology logs. Core recovery is generally greater than 95%.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 15

 

 

 

Figure 3PLAN AND LONG SECTION - MINERALISED SYSTEMS
BDA - 0230-04-April 2024Behre Dolbear Australia Pty Ltd

 

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 16

 

 

1.9Mineral Processing and Metallurgical Testing

 

With 56-years of operating history (23-years under Glencore ownership), the CSA orebody mineralogy and the operating performance of the processing plant is well understood, with the processing plant consistently achieving metallurgical recoveries in the order of 97-98% to produce a high-quality 26-27% Cu concentrate. Other than routine day-to-day process performance monitoring and improvement on the internal metallurgical models, no metallurgical testwork is generally undertaken or warranted unless new styles of mineralization are encountered.

 

1.10Mineral Resource Estimates

 

The Mineral Resource estimate for the CSA Mine is reported here in accordance with the SEC S-K 1300 regulations. The Mineral Resources presented in this section are not Mineral Reserves and do not reflect demonstrated economic viability. The reported Inferred Mineral Resources are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as Mineral Reserves. There is no certainty that all or any part of this Mineral Resource will be converted into Mineral Reserve. All figures are rounded to reflect the relative accuracy of the estimates and totals may not add correctly. Mineral Resource estimates exclusive of Mineral Reserves are summarized in Table 1.1 on a 100% ownership basis. The effective date of the Mineral Resource estimate is August 31st, 2023.

 

Table 1.1

 

Copper and Silver Mineral Resources Exclusive of Mineral Reserves as at 31 August 2023

 

(Based on a Copper Price of US$8,279/t at 1.5% Cu Cut-Off Grade)

 

System  Resource
Category
  Tonnes
Mt
   Cu
%
   Cu Metal
kt
   Ag
g/t
   Ag Metal
Moz
 
All Systems  Measured   3.3    5.6    182    19    2.0 
   Indicated   1.4    3.4    47    6    0.3 
   Meas + Ind   4.7    4.9    229    15    2.3 
   Inferred   3.3    5.5    184    21    2.2 
   Total   8.0    5.2    413    18    4.5 

 

Notes:

 

·Mt = million tonnes, kt = thousand tonnes, g/t = grams per tonne, Moz = million ounces

·Mineral Resources are reported as at 31 August 2023 and are reported using the definitions in Item 1300 of Regulation S-K (17 CFR Part 229) (SK1300)

·Mineral Resources are reported excluding Mineral Reserves

·The Qualified Person for the estimate is Mike Job, of Cube Consulting Pty Ltd

·Price assumptions used in the estimation include US$8,279/t of copper and US$22.60/troy ounce (“oz”) of silver; in line with long term Broker Consensus forecast copper pricing as at August 8, 2023

·Geological mineralization boundaries defined at a nominal 2.5% Cu cut off for high grade lenses, and 1.5% Cu for the lower-grade halo; Mineral Resources reported above a 1.5% Cu cut-off grade

·Costs assumptions underlying cut-off grade calculation include US$78/t ore mined, US$20/t ore milled and US$21/t G&A

·Metallurgical recovery assumptions used in the estimation were 97.5% copper recovery and 80% silver recovery

·Mineral Resources reported as dry, raw, undiluted, in-situ tonnes

·Figures are subject to rounding.

 

Approximately 73% of the current Mineral Resource tonnage and 78% of the contained copper lies within the QTSN and QTSC systems.

 

1.11Mineral Reserve Estimate

 

CSA produces an annual Mineral Reserve estimate, based on actual stope designs incorporating mining losses and mining dilution. The Mineral Reserve, in accordance with the Subpart 229.1300 of Regulation S-K, is based on Measured and Indicated resources only. CSA’s August 2023 Mineral Reserve estimate is shown in Table 1.2.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 17

 

 

Table 1.2

 

Copper and Silver Mineral Reserves as at 31 August 2023 - Based on a Copper Price of US$8,279/t

 

System  Reserve
Category
  Tonnes
Mt
   Cu
%
   Cu Metal
kt
   Ag
g/t
   Ag Metal
Moz
 
All Systems  Proven   8.3    3.5    293    14.4    3.9 
   Probable   6.6    3.1    201    11.2    2.4 
   Total   14.9    3.3    494    13.0    6.2 

 

Notes:

 

·Mineral Reserves are reported as at 31 August 2023 and are reported using the definitions in Item 1300 of Regulation S-K (17 CFR Part 229)(SK1300)

·The Qualified Person for the estimate is Jan Coetzee, an officer of the Registrant’s Australian subsidiary

·Price assumptions used in the estimation include US$8,279/t of copper and US$22.60/troy ounce of silver; in line with long term Broker Consensus forecast copper pricing as at August 8, 2023

·Mineral Reserves reported as dry, diluted, in-situ tonnes using a Stope breakeven cut-off grade of 2.2% Cu for 2024 to 2026, a cut-off grade of 1.65% for the remaining periods and a Development breakeven cut-off grade of 1.0% Cu

·Cost assumptions underlying the cut-off grade calculation include A$78/t ore mined, A$20/t ore milled and A$21/t G&A

·Metallurgical recovery assumptions used in the estimation were 97.5% copper recovery and 80% silver recovery

·Figures are subject to rounding.

 

BDA notes that Mineral Reserve estimate underpins an estimated 11-year mine life.

 

1.12Mining Methods

 

The CSA mine uses mechanized long-hole open stoping (“LHOS”) with cemented paste fill (“CPF”) as the preferred mining method. Both transverse and longitudinal retreat sequences are applied, adopting the LHOS method to the QTSN, QTSC and Eastern orebodies. A modified Avoca stoping method using waste rock fill and temporary rib pillars has been used successfully in the narrower lenses, principally in the Western orebody. The future dominance of the QTSN orebody, representing approximately 68% of the copper metal currently estimated in the Mineral Reserve, creates some concentration risk. Estimated Mineral Resources in the other orebodies and remnant areas of the mine create contingent ore sources. One of the critical aspects to achieving production objectives is prioritising and increasing the mine development advance as well as access to drilling and extraction horizons.

 

Copper production at the CSA mine is currently mining rate constrained. Considerable effort in recent years, and the current capital expenditure programmes underway, are all aimed at maximising ore production as the mine gets deeper. MAC is targeting future ore production of approximately 1.4Mtpa; increasing depth introduces additional mining challenges, and with annual increasing mining costs and lowering of delivered grades in some areas, the long-term focus needs to be on continual improvement in operating efficiencies.

 

With the mine progressively becoming deeper, rock stresses are increasing, and more ventilation and cooling is required. A significant capital works program was completed in 2022 to increase both fresh air delivery and cooling to accommodate the current LOM plan. Additional work is required to provide suitable underground ventilation connections to manage the current return air restrictions and limitations. In addition, the current resource estimate demonstrates that the mineralization tonnes per vertical meter is diminishing with depth, although this is partially impacted by limited drilling at depth. Importantly, with increasing depth, travel times for employees and equipment increase and issues around ore and waste movement from the lower levels of the mine to the hoisting shaft or distant stope voids (in the case of waste rock) require more closely coordinated planning and management.

 

Despite the combination of geotechnical stress increasing with depth and the cleaved and bedded siltstones, ground conditions at the current base of the mine appear fair. A recent rockfall towards the bottom of the decline, convergence and buckling in some development drives, and issues with a recent vent raise, are the result of the increasing geotechnical stress but such issues are not unexpected and in BDA’s opinion are being appropriately managed. Changes to stope design and sequencing as well as positioning of access drives, declines and ventilation infrastructure and ground support practices are all being re-assessed in light of the geotechnical conditions, and improvements can and are being made.

 

The mining operation needs to be geotechnically driven; a move to mining quality over quantity is required to match the geotechnical conditions and logistical challenges that come from mining at depth.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 18

 

 

1.13Processing and Recovery Methods

 

The CSA processing plant is a conventional underground crushing, surface grinding and flotation circuit. Replacement of the two Semi Autogenous Grinding (“SAG”) mills, which were around 50 years old, was completed in 2023 and has returned the grinding circuit overall utilization to 91-97%, further supporting a processing capacity in excess of 1.4Mtpa. The four coarse ore bins (which date from the 1960s) have experienced downtime for ongoing maintenance and can only be partially filled in their current state. A staged remediation program is planned to be implemented as a priority. Any increase in the mill throughput is still likely to be constrained by the ability of the mining operation to deliver increased ore tonnage.

 

Availability of the plant has been good, however, utilization of availability has been poor. Ore delivery from underground has been inconsistent and the low plant utilization is predominantly related to delays in underground ore delivery.

 

A programme of ongoing refurbishment of the flotation cells is underway, including froth control automation. Reagent supply is steady, air delivery is good, and the process control system is performing satisfactorily. Normal continuous improvement practices are being encouraged.

 

BDA considers the metallurgical performance at CSA to be good, with consistently high copper recoveries and reasonable copper concentrate grades and payable silver grades. Based on the consistency of ore feed and metallurgy over the years there is every reason to believe this performance will be maintained.

 

1.14Infrastructure

 

Road access to the mine site from Sydney is via National Highway No. A32, the Barrier Highway, a high-quality rural highway to Cobar and from there to the mine site on sealed urban roads.

 

Cobar is serviced by a sealed airstrip with commercial flights five times per week to and from Sydney.

 

The site is serviced by a rail line which allows transport of concentrate product to the Port of Newcastle for export. Concentrate is loaded into rail wagons at the site and railed to Newcastle along the NSW rail network. Railing to Port Kembla, south of Wollongong, is also an option.

 

Power supply to the site is via a 132kV transmission line from Essential Energy’s western NSW network. The Essential Energy network is supplied by a mix of conventional and renewable power generation. A 22kV line is also connected to the site from Cobar and is available for limited supply in emergencies.

 

The majority of water supply for the operation is provided by the Cobar Water Board from a weir on the Bogan River at Nyngan through a network of pumps and pipelines. Additional water is available from tailings water recycling, surface water capture and a borefield installed in 2019. Water demand is around 3 megalitres per day (“ML/day”) in summer, with most water supplied by the Cobar Water Board system. The Cobar Water Board system is adequate to supply the operation up to around 1.4Mtpa; the borefield is only required during periods of drought or should a plant feed rate in excess of 1.4Mtpa be considered for extended periods.

 

The majority of the workforce is accommodated in Cobar with some senior staff employed on a fly in/fly out (“FIFO”) or drive in/drive out (“DIDO”) arrangement. No workforce accommodation is provided at the mine site itself, however, the Company owns and leases various properties in Cobar.

 

Site buildings comprise site offices, warehouses, and services buildings. Site services include power and water reticulation facilities, communications systems and fuel storage and dispensing facilities.

 

South Tailings Storage Facility (“STSF”)

 

The STSF average deposition rate is 55kt per month. At the current rate, based on the latest Stage 9 embankment raise, the STSF has capacity to store tailings up to February 2025. Further embankment raises, Stage 10 and Stage 11 are planned. Stage 10 is designed and permitted with construction to begin in Q3 of 2024.

 

The STSF appears to be well operated with no significant issues in relation to the facility’s integrity. In 2023, CSA completed a study on the installation of buttressing in specific areas on the STSF wall. The buttresses are designed to improve the Factor of Safety (“FOS”) to the Post Seismic (Liquified Strength), in line with ANCOLD guidelines. Buttress construction works are on track to be completed by the end of April 2024.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 19

 

 

Waste Rock

 

Waste rock from underground development is backfilled into mined out stopes where possible, but any excess is hoisted or trucked to surface for storage on waste dumps. Most waste rock is classified as Non-Acid Forming (“NAF”) but around 30% of the waste material is classified as Potential Acid Forming (“PAF”) rock. All waste rock materials are geochemically tested for issues related to acid rock drainage (“ARD”) and potential for metal leaching. Only suitable, low risk waste rock material is hoisted and stockpiled on the surface.

 

1.15Market Studies

 

This section contains forward-looking information related to commodity demand and prices for the Project. Copper Outlook Reports dated Q3 2023 published by global research and consultancy group Wood Mackenzie and general market intelligence were used as the source of copper market information for this report.

 

Demand for copper has been growing rapidly as it is relied upon by many industries for its high conductivity, malleability, corrosion resistance, and antimicrobial nature. Global refined and total copper consumption is forecast to grow at a compound annual growth rate (“CAGR”) of 2.1% and 2.6% respectively between 2023 and 2033, with refined copper demand having already grown from 19.6Mt in 2012 to 25.2Mt in 2022.

 

Copper production rates have grown in response to increasing consumer demand. Refined copper supply has grown from 14.8Mt in 2000 to 25.4Mt in 2022 at an average annual growth rate of ~2.5%. Based on the production capabilities of existing and probable copper mines (assuming 70% brownfields probable projects plus 20% mine-life extensions), Wood Mackenzie forecasts that supply will be able to meet demand requirements for the next ~3 years, until the end of 2026. By 2027, a theoretical supply gap will emerge, growing to ~5.0Mt by 2033 after factoring in the contribution of copper scrap.

 

Broker consensus prices as at 8 August 2023, comprising over 25 contributing analysts, indicates forecast copper prices to rise from US$8,584/t in August 2023 to a peak of US$9,372/t in 2026, as the market moves into a period of high demand. From 2026 onward, consensus forecasts assume a long-term average of US$8,279/t (US$3.76/lb).

 

Silver contributes around 3% of project revenue. The spot silver settlement price averaged US$22.65/oz in 2022 and has averaged US$23.33/oz in 2023. Due to silver’s large and increasing industrial uses, the silver price also benefits when industrial metals rally, with the strength in the price in 2023 being driven by positive industrial fundamentals, and supply shortages which are likely to be sustained going forward.

 

Broker consensus prices as at 8 August 2023, indicates forecast silver prices holding relatively steady around US$23.60/oz in August 2023 through 2025. From 2025 onward, consensus forecasts assume a reduction to a long-term average of US$22.60/oz. The concentrate produced at CSA is a high-quality product, with no deleterious elements above penalty levels and is highly sought after for blending with other concentrates.

 

Smelter terms are typically settled on an annual ‘Benchmark’ basis between major miners and smelters and published as a reference Benchmark. In addition, smelters often purchase concentrate on the spot market which is more reflective of the short-term supply and demand balance.

 

As part of MAC’s binding sale and purchase agreement with GIAG, MAC has entered into an agreement to sell all concentrate product from the CSA mine to GIAG (the “Offtake Agreement”). The Offtake Agreement for the CSA mine commits 100% of the produced concentrate for the life of mine to GIAG, as the sole customer. The offtake terms are referenced to the annual Benchmark terms set by the industry and published annually and are therefore considered market competitive.

 

1.16Environmental Studies, Permitting and Plans, Negotiations or Agreements

 

CSA operates under a documented Environmental Management System (“EMS”) which forms the basis of environmental management at CSA mine and includes appropriate procedures, standards, and Environmental Management Plans (“EMP”) to ensure all regulatory requirements are met.

 

The planned future STSF containment raise Stage 10 has been approved, and Stage 11 has commenced early phase planning to provide additional storage capacity. Regulatory standards that currently apply to the STSF are Dam Safety NSW and Australian National Committee on Large Dams (“ANCOLD”).

 

There is strong community support for the CSA operation and CSA has a positive working relationship with Cobar Shire Council (“CSC”). This is not unexpected given that the CSA mine is the largest employer in the Cobar region, with approximately 500 employees.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 20

 

 

1.17Capital and Operating Costs

 

Capital and operating costs were developed based on historical cost performance and first principal calculations using current commodity costs, labour rates and equipment costs. The costs are provided for each major cost centre including mining, processing, G&A, off site costs, major capital works and fleet replacement and closure costs.

 

Capital works for which capital costs have been estimated generally comprise:

 

·underground mining capital works, including upgrading of the underground ventilation network, maintenance of fixed and mobile plant, exploration and resource drilling, and replacement of major equipment

·on-going sustaining capital for the concentrator and supporting infrastructure

·capitalised underground development

·ongoing replacement of mobile equipment at the end of their respective lifecycle

·rehabilitation of project facilities at the end of the mine life.

 

The MAC forecast of costs for capital works over the life of the mine are summarized in Section 18. For the majority of the significant capital works in the early years, the estimates are based on feasibility study standard engineering and unit costs from quotations from prospective suppliers and contractors or historical cost records. The estimates for the later years will have a higher level of confidence as the projects move forward in the LOM. Capital expenditure (including mine development) for 2023 was US$46M, with the forecast for 2024 increasing to US$69M. It is understood that the estimates for the major capital works include contingency allowances of around 10%.

 

Due to the recent upgrade of the mining fleet (including the increased payload) and acceleration of shallower mining fronts such as QTSC (mining up and down the orebody), Eastern orebody and lenses at shaft level in QTSN, the ore cycle time and associated haulage requirements are expected to remain relatively consistent over the next 5-6 years. As a result of the more recent steady production profile, fleet and labour requirements are forecast to remain relatively steady and operating costs at CSA are expected to remain substantially consistent throughout the Reserve LOM.

 

The MAC forecast operating costs are estimated using CMPL actual costs as the underlying basis. The split between capitalized development and underground mining cost is calculated during the mine planning process and based on the function of the underground development being established, with its respective allocation to mining operations or capital infrastructure.

 

The CSA mine has a relatively high proportion of fixed costs; any performance improvement will lead to reduced unit operating costs. Mining is responsible for around 66% of site cash costs and 55% of total cash costs. Of the site mining costs, 37% relates to labour and contractor costs.

 

The MAC ore mining rate is forecast to average US$77/t, processing costs to be around US$20/t milled and G&A costs averaging approximately US$20/t milled, over the Reserve LOM. Overall, the unit costs appear achievable provided the planned efficiencies are implemented and the mine and mill production forecasts can be achieved.

 

Further detail on Capital and Operating costs are outlined in Section 18.

 

1.18Economic Analysis

 

This section contains forward-looking information related to the economic analysis for the Project. The material factors that could cause actual results to differ materially from the conclusions, estimates, designs, forecasts or projections in the forward-looking information include any significant differences from one or more of the material factors or assumptions that are set forth in this sub-section including estimated capital and operating costs, project schedule and approvals timing, availability of funding, projected commodities markets and prices.

 

All costs, prices, and monetary values are in Q1 2024 United States Dollars (US$).

 

The economic analysis of CSA was conducted based on a mine design and schedule of the mined and processed copper ore outlined in the Mineral Reserves (“Reserve Case”). A Discounted Cashflow (“DCF”) model was developed for this Reserve Case using price assumptions in line with long-term, real, Broker Consensus forecast copper and silver product prices, being US$8,279/t and US$22.6/oz, respectively. Price assumptions are further outlined in Section 16.4.

 

The Qualified Persons are of the opinion that these prices reasonably reflect a conservative view of current market prices and are reasonable to use as a forecast of future prices for the purpose of the economic analysis for this report.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 21

 

 

The discounted cashflow establishes that the Mineral Reserve estimates provided in this report are economically viable. The base case after-tax NPV (8%) is estimated to be US$708M. The Net Present Value determined from a discounted cashflow analysis is most sensitive to copper price.

 

Given the extent of historical operations and operating knowledge at CSA, the Mineral Reserve QP considers the accuracy and contingency of cost estimates used to be well within a feasibility study standard and sufficient for the economic analysis supporting the Mineral Reserve estimate.

 

1.19Qualified Persons’ Opinion on Conclusions and Recommendations

 

The CSA mine is well established and has a long operating history with well understood and predictable mineralized lodes leading to reliable Mineral Resource and Mineral Reserve estimation. Production reconciliation continues to support these estimates. Similarly, operating costs have been consistent over recent years providing confidence in the forecast operating costs.

 

MAC is forecasting a modest increase in annual ore mined to better utilize the capacity of the process plant; while this may lead to some reduction in unit costs, forecast operating costs have taken into account the general increases in input costs experienced across the entire mining industry.

 

BDA notes that a large proportion of the Mineral Resource lies in the deeper portions of the CSA mine. However, the Mineral Reserve is largely accessible from the existing mine development, and as such, should experience mining conditions no worse than experienced today. The CSA mine has an estimated mine life of approximately 11 years based on the current Mineral Reserves (August 2023) and is considered relatively low risk.

 

Overall, BDA considers that the current Mineral Resource estimate prepared by Mr Mike Job of Cube Consulting and the Mineral Reserve estimate prepared by Mr Jan Coetzee of MAC provide a reasonable, but probably conservative, guide to the in situ and recoverable mineralization respectively. Significant exploration potential remains within the mine area, most notably the down dip extensions of lodes which remain open at depth. Drilling at depth is relatively sparse, such that these projections cannot currently be incorporated into Mineral Reserves. Nevertheless, there is reasonable expectation that the mine life will extend well beyond the current Mineral Reserve limits, and the mine has a long history of ongoing reserve replacement.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 22

 

 

2Introduction

 

2.1Registrant

 

Behre Dolbear Australia Pty Limited (BDA) was engaged by Metals Acquisition Limited (MAC or the “Registrant” or the “Company”) to prepare an independent Technical Report Summary (Technical Report or the Report) on the CSA Copper Mine (CSA or the Project), located in western New South Wales, 11km northwest of the town of Cobar, Australia.

 

2.2Lead Author – Behre Dolbear Australia (BDA)

 

BDA is a mineral industry consulting group, specialising in Independent Technical Expert due diligence reviews, valuations and technical audits of Mineral Resources and Mineral Reserves, mining and processing operations, project feasibility studies, and Independent Engineer work on project development, construction, and certification. BDA specialises in review and due diligence work for companies and financial institutions. BDA is typically engaged to undertake independent expert reviews, to provide advisory services and to monitor a company’s or financial institution’s interests through the design, construction, commissioning, and ramp-up phases of a project.

 

The parent company, Behre Dolbear and Company Inc. has operated continuously as a mineral industry consultancy since 1911, and has offices or agencies in Denver, New York, Toronto and London, as well as Sydney. Behre Dolbear has over 60 Associates and Consultants covering a wide range of technical expertise and with experience in most parts of the world. BDA is the Australian affiliate and was founded in 1994. BDA operates independently, using primarily Australian-based consultants, but using overseas specialists where appropriate. BDA has acted on behalf of numerous international banks, financial institutions and mining clients and is well regarded as an independent expert engineering consultant in the minerals industry.

 

BDA is independent of MAC, CMPL and Glencore and has no interests in the companies or assets described in this report. BDA will receive its normal consulting fees and expenses for undertaking this review.

 

2.3Terms of Reference

 

Report Purpose

 

The purpose of this report is to support the Mineral Resource Estimate and Mineral Reserve Estimate for the CSA mine, both of which have an effective date of August 31st, 2023.

 

This report has an effective date of April 22nd, 2024.

 

Terms of Reference

 

This Technical Report Summary conforms to United States Securities and Exchange Commission’s (SEC) Modernized Property Disclosure Requirements for Mining Registrants as described in Subpart 229.1300 of Regulation S-K, Disclosure by Registrants Engaged in Mining Operations (S-K 1300) and Item 601 (b)(96) Technical Report Summary.

 

Unless otherwise indicated, all financial values are reported in United States (US) currency (US$) including all operating costs, capital costs, cash flows, taxes, revenues, expenses, and overhead distributions.

 

Unless otherwise indicated, the metric system is used in this Technical Report.

 

2.4Qualified Persons

 

Qualified Persons of Behre Dolbear Australia

 

The qualifications and relevant experience for each Behre Dolbear Australia, Qualified Persons are shown below.

 

Mr Malcolm Hancock (BA, MA, FGS, FAusIMM, MIMM, MMICA, CP (Geol), MAIMVA) is a Principal and Executive Director of BDA. He is a geologist with more than 45 years of experience in the areas of resource/reserve estimation, reconciliation, exploration, project feasibility and development, mine geology and mining operations. Before joining BDA, he held executive positions responsible for geological and mining aspects of project acquisitions, feasibility studies, mine development and operations. He has been involved in the feasibility, construction, and commissioning of several mining operations. He has worked on both open pit and underground operations, on gold, copper, base metal, uranium, light metal and industrial mineral projects, and has undertaken the management and direction of many of BDA’s independent engineer operations in recent years. Mr Hancock has provided project direction, report management and editing.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 23

 

 

Mr John McIntyre (BE (Min) Hon., FAusIMM, MMICA, CP (Min), MAIMVA) is a Principal and Managing Director of BDA. He is a mining engineer who has been involved in the Australian and international mining industry for more than 45 years, with operational and management experience in copper, lead, zinc, nickel, gold, uranium and coal in open pit and underground operations, including 5 years as a junior mining engineer in the CSA mine. He has been involved in numerous mining projects and operations, feasibility studies and technical and operational reviews in Australia, West Africa, New Zealand, North and South America, PNG and Southeast Asia. He has been a consultant for more than 30 years and has been Managing Director of BDA since 1994, involved in the development of the independent engineering and technical audit role. Mr McIntyre has provided project direction and was involved in the underground mining, geotechnical, hydrological and cost review.

 

Mr Mark Faul (BE. Min (Hons), MBA, MAppFin, FAusIMM, GAICD, MAIMVA) is General Manager of BDA is a mining engineer with extensive mining finance and investment experience with more than 35 years in the mining, resources investment banking and private equity investing in Australia, SE Asia, PNG, Africa, Europe and the Americas. His experience includes operations management, project feasibility and development, strategic planning, due diligence, cost assessment, financial modelling, project and corporate finance. He is experienced in a range of commodities, including gold, copper, nickel, base metals, platinum group metals, minor metals, diamonds and gemstones, rare earths, uranium, in both surface and underground mining, as well as coal seam gas and conventional oil & gas. He has extensive experience in mine management, economic analysis, project evaluation, valuation, risk management, project finance from a financier and investor prospective, and as a company director. Mr Faul was the Project Manager for this assignment, reviewing mining aspects, mine production plans, operating costs and compiling the report, and managing the review.

 

Mr George Brech (BSc. Geology, M.Sc. Engineering Geology, FAusIMM) is a Senior Associate of BDA with more than 45 years of experience in exploration and mining as an exploration and mine geologist. He is experienced in management, exploration, project evaluation, mine development, Mineral Reserve estimation, feasibility studies, open pit mine production, exploration and mine data evaluation, and open pit slope engineering. He has worked in various capacities on a large number of projects providing geological expertise in Australia (14 years), in southern Africa (7 years) and Southeast Asia (20 years). He is familiar with a wide range of commodities including gold, nickel, copper, wolfram, magnesite, iron ore and coal. He has extensive experience in the areas of resource/reserve estimation, reconciliation, independent expert and due diligence reports. Mr Brech has reviewed the geological data and drilling, sampling and assaying review, earlier resource/reserve assessment and grade control practices.

 

Mr Joe Pease (BE. (Hons) Metall., B Econ, FAusIMM, MCIMM) is a Senior Associate of BDA with more than 35 years of experience in the Australian mining industry. He is a metallurgist and has held senior management positions with MIM, Cominco and Xstrata. He has been involved in plant design and optimisation, process design testwork, feasibility studies and plant commissioning and project valuation. He is experienced in a range of process technologies and has worked with a range of commodities including copper, gold, lead, zinc, coal, magnetite and potash. He has worked as CEO of the Cooperative Research Centre, and is a Principal Consultant for Mineralis Pty Ltd. Mr Pease has reviewed the metallurgical testwork, process plant design, flow sheet, recovery forecasts, plant throughput and capital and operating cost forecasts.

 

Mr Richard Frew (BE Civil, MIE Aust) is a Senior Associate of BDA with more than 40 years’ experience as a planning, estimation and contracts engineer. He is experienced in contract management, feasibility study review, financial modelling, capital cost estimation, infrastructure, project controls, critical path analysis, project implementation and contract assessment. He has worked on a large number of projects providing management and project services to the owners or financiers, including major projects in Australia, the Philippines, Argentina, Mauritania, New Zealand and Romania. Mr Frew has reviewed the infrastructure, capital cost and project management aspects.

 

Mr Adrian Brett (BSc (Hon) Geol., MSc, MEnvir. Law, FAusIMM) is a Senior Associate of BDA with more than 40 years’ experience in environmental and geo-science, including the fields of environmental planning and impact assessment, site contamination assessments, environmental audit, environmental law and policy analysis and the development of environmental guidelines and training manuals. He has worked in an advisory capacity with several United Nations, Australian and overseas government agencies. He has completed assignments in Australia, Indonesia, PNG, Thailand, Laos, the Philippines, the Middle East, Africa and South America. Mr Brett is widely experienced in environmental and social/community audits, reviews of environmental and social management plans and policies, closure plans and gap analysis. Mr Brett has reviewed all relevant environmental aspects and social considerations, consistent with environmental standards and compliance, as well as closure plans.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 24

 

 

Company Address:

 

Behre Dolbear Australia Pty Limited

Level 9, 80 Mount Street

North Sydney, New South Wales, Australia

 

Qualified Persons of Cube Consulting

 

Mike Job of Cube Consulting Pty Limited, West Perth, acted as Qualified Person (“QP”) for the Mineral Resource estimate.

 

The qualifications and relevant experience for this Qualified Person are shown below.

 

Mr Mike Job (BSc Geol., MSc Geostatistics, FAusIMM) is a Principal Geologist and Director of Cube Consulting and has over 35 years mining industry experience in roles that have varied from mine operations to regional exploration and mineral resource estimation. He has worked on projects throughout Australia, Africa and North America and has experience with many commodities across varied geological environments. He has worked on projects for nickel (sulphide and laterite), many types of gold systems, copper, iron ore (hematite and magnetite), uranium, tin, polymetallic VMS deposits, and numerous specialty metals. His specialties include geological data gathering and interpretation, and Mineral Resource estimates that are practical, robust and auditable. He has sound technical expertise in resource estimation and grade control systems for both open cut and underground mines and has significant management experience at operating mines. He is an expert user of Datamine and Isatis software and has a solid base of geostatistical knowledge gained via his MSc in Geostatistics from the Centre for Computational Geostatistics at the University of Alberta in Canada.

 

Company Address:

 

Cube Consulting Pty Limited

Level 4, 1111 Hay Street

West Perth, Western Australia

 

Qualified Persons of Metals Acquisition Corp.

 

Mr Jan Coetzee of Metals Acquisition Corp. acted as QP for the Mineral Reserve estimate.

 

The qualifications and relevant experience for this Qualified Person are shown below.

 

Mr Jan Coetzee (GDMin, MAusIMM, CP (Min), RPEQ, QP) is an Officer of Metals Acquisition Corp Australia Pty Ltd. and has over 30 years of experience as a mining engineer. Mr Coetzee has worked primarily across Africa and Australia in various roles covering mine design and engineering, technical services, projects, studies and management. He is experienced in multiple minerals including platinum group elements, gold, copper, lead, zinc, silver and coal and has direct engineering experience across various mining methods, including open-cut, underground hard-rock and long-wall coal. Mr Coetzee has significant experience in senior management, operations, business improvement, strategic project studies and mine planning in long term design and planning of mining operations and, as a result, has acted previously as both Qualified Person under United States Securities and Exchange Commission regulation and Competent Person under Australia’s Joint Ore Reserves Committee (JORC) and the South African Code for the Reporting of Mineral Resources and Mineral Reserves (SAMREC). In addition to his diverse mining experience, Mr Coetzee has particular expertise in the CSA mine, having worked there as Senior Long Term Planning Engineer for over two years.

 

Company Address:

 

Century House, Ground Floor Cricket Square,

P.O. Box 2238

Grand Cayman KY1-1107, Cayman Islands

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 25

 

 

2.5Site Visits and Scope of Personal Inspection

 

Mr Joe Pease, Senior Metallurgical Associate of BDA visited the CSA site in January 2022. Mr Mark Faul, General Manager of BDA (a Qualified Person) visited the CSA site in March 2022. Mr Faul and Mr Malcolm Hancock, Executive Director of BDA, also visited the CSA site in September 2023 and held meetings with key mine operating management and received presentations on the mine’s recent performance and forecast production plans. A surface tour of the mine facilities and tailings storage facility and an underground tour of the mine infrastructure and lower mining levels was also undertaken.

 

Mr Jan Coetzee, officer of Metals Acquisition Corp Pty Ltd. and QP for the Mineral Reserve estimate, has been employed at CSA mine for approximately four years (2020 - 2024) and has a thorough understanding of the mine and surrounding region.

 

2.6Information Sources

 

In addition to the site visits, BDA has reviewed technical data, management presentations and reports made available by the CSA mine in its virtual dataroom (“VDR”) and provided by MAC, Mr Mike Job of Cube Consulting (QP for the Mineral Resource) and Mr Jan Coetzee of MAC (QP for the Mineral Reserve).

 

The reports and documents listed in Section 24 of this Report were used to support the Report preparation.

 

All plans for mining operations, future plans, potential, forecasts, projections, and estimates of Mineral Resources, Mineral Reserves and LOM Mine Plans and Production Schedules are forward looking statements. BDA considers this report and its conclusions provide a fair and reasonable assessment of the CSA mine operations, future plans, and potential. BDA has used appropriately experienced consultants in the due diligence review. MAC has confirmed that the information supplied is complete and not misleading. However, any forecasts and projections cannot be assured and factors both within and beyond the control of MAC could cause the actual results to be materially different from BDA’s assessments and the projections contained in this report.

 

2.7Previous Reports on the Project

 

Metals Acquisition Limited has previously filed Technical Report Summaries for the Project with the United States Securities and Exchange Commission. The last Technical Report Summary (“TRS”) filed was on April 18th 2023 as Exhibit 96.1 to the Company’s Form F4/A filing at the time. The TRS filed on April 18th 2023 reported the Company’s Mineral Resource and Mineral Reserve Estimates as at December 31st, 2022.

 

Additional previous Mineral Resource and Mineral Reserve estimates are known to have been reported to other Non-US regulatory bodies by Glencore Plc. (LON: GLEN) and Metals Acquisition Limited CHESS Depository Interests (“CDI”) (ASX: MAC) under JORC Code 2012, however such works should not be considered in conformance with United States Securities and Exchange Commission’s (SEC) Modernized Property Disclosure Requirements for Mining Registrants as described in Subpart 229.1300 of Regulation S-K (“SK1300”), Disclosure by Registrants Engaged in Mining Operations and Item 601 (b)(96) Technical Report Summary.

 

All CSA Mineral Resource or Mineral Reserve statements developed or referred to in this report which are dated prior to the December 31st, 2022 Mineral Resource Estimate and Mineral Reserve Estimate, should not be considered as compliant with Subpart 229.1300 of Regulation S-K. For clarity, the 31 August 2023 Mineral Resource Estimate provided by Mr Mike Job (QP) and 31 August 2023 Mineral Reserve Estimate provided by Mr Jan Coetzee (QP) presented in this Report by BDA, are compliant with Subpart 229.1300 of Regulation S-K.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 26

 

 

 

3Property Description

 

3.1Property Location

 

The CSA Copper Mine (latitude 31° 24’ 32.42°S, longitude 145° 48’ 0.20°E) is located 11km northwest of the town of Cobar, in western New South Wales, Australia (Figure 1), approximately 600km west-northwest of Sydney.

 

Cobar Management Pty Ltd (CMPL) is an Australian legal entity and operator of CSA mine. CMPL is the registered owner of all key assets of the mine including property, mineral, fixed and mobile assets used in the operation. CMPL is ultimately owned by Metals Acquisition Limited (MAC) who completed the purchase transaction from Glencore International AG on 16 June 2023.

 

3.2Property and Title in Australia

 

The forms of Australian land title relevant to the CSA mine are listed below.

 

Crown Lands

 

Crown land is land that is owned and managed by the NSW Government. It accounts for approximately 42% of all land in New South Wales and carries special provisions. Crown land includes a range of land types, such as:

 

Crown lands held under lease, licence or permit

 

Community managed reserves

 

Lands retained in public ownership for environmental purposes

 

Lands within the Crown public roads network

 

Other unallocated lands.

 

Many non-tidal waterways across the state also comprise Crown land as do most tidal waterway land.

 

Western Lands Lease

 

Nearly all the land in the Western Division of NSW is held under Western Lands Leases granted under the Western Lands Act 1901. From 1 July 2018, this legislation was replaced by the Crown Land Management Act 2016 (“CLM Act”). The 6,600 Western Lands Leases include: 4,300 for grazing; 573 for agriculture; 1,593 for residence; 134 for mining and other specific purposes. Most leases are perpetual (ongoing) and can only be used for a designated purpose. The State charges an annual rent for leases in accordance with the CLM Act; grazing and agriculture lease rents are based on the total area of the property and on the environmental impact of the land use, including a credit for managed conservation. Rents for residential and business leases are 3% and 6% of the unimproved land value, respectively.

 

3.3Mineral Title in New South Wales

 

The types of NSW mineral titles relevant to the CSA mine are listed below.

 

Exploration in NSW is regulated under the Mining Act 1992. The aim is to encourage and help in the discovery and development of NSW’s mineral and coal resources and encourage ecologically sustainable development. Before exploring for minerals in NSW, an explorer must obtain an exploration licence.

 

Exploration Licence (“EL”)

 

This licence grants the title holder the exclusive rights to explore for a specific mineral or mineral group(s) within a designated area. ELs are typically granted and renewed for periods of 2–6 years. An EL does not permit mining, nor does it guarantee that a mining lease will be granted.

 

Exploration (Prospecting) Licence (“EPL”)

 

These licences were granted under the Mining Act 1973 to allow a title holder to explore for minerals (excluding coal) within a designated area. While EPLs are no longer granted, some remain active. Under the Mining Act 1992, EPLs are deemed to be exploration licences, however they do not permit mining, nor guarantee that a mining lease will be granted.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 27

 

 

Mining Lease (“ML”)

 

A mining (minerals) lease application is made when mining or production is economically, technically and environmentally feasible. At this stage companies must specify exactly what mineral(s) they intend to extract. Mining leases give the title holder the exclusive right to extract a specific resource over a selected area.

 

To be granted a mining lease companies must prove that there is an economically mineable mineral resource within the area of the proposed mining lease, and that they have the financial and technical resources to carry out any mining in a responsible way. A development consent must be granted by the relevant consent authority, and an Environmental Protection Licence (EPL) must have been issued by the NSW Environmental Protection Agency under the Protection of the Environment Operations Act 1997.

 

Title holders must comply with all conditions of title and all relevant requirements of the Mining Act 1992 and associated regulations for the life of the lease.

 

Mining Purposes Lease (“MPL”)

 

These are leases granted for areas in mineral mining operations for purposes such as infrastructure where resource extraction does not take place. Hence, they will appear as “nil mineral”. MPLs were granted under the 1906 and 1973 Mining Acts. MPLs are no longer granted and leases for mining purposes are now categorised as MLs under the Mining Act 1992.

 

Consolidated Mining Lease (“CML”)

 

This is a mining lease which covers adjoining titles held by one title holder. On a CML, there is often a common border between where mining takes place or additional areas shown as “'nil mineral” areas, which is where production facilities and other infrastructure may be located.

 

3.4Mineral Titles, Claims, Rights, Leases and Options

 

Mineral Titles

 

CMPL has an extensive mineral tenement holding located in the prospective Cobar Basin comprising one Mining Lease (CML5), two Mining Purposes Leases (MPL1093/1094), five wholly owned Exploration Licences (EL5693, EL5983, EL9587, EL9595, EL9596)), two joint venture (“JV”) Exploration Licences (EL6223/6907) and three ELs in which CMPL’s interest has recently been converted to a royalty interest (EL6140/6501/6739) (Table 3.1) (Figures 2 and 4). CML5 and MPL1093/1094 will reach expiry within the Reserve life of mine period, across 2028 and 2029. CMPL has begun preparations for the renewal application, well in advance of the expiry, and expects the renewals to be granted in due course.

 

CML5 covers an area of approximately 24.7km2 (2,474 hectares (“ha”)), the MPLs total approximately 30ha, while the surrounding exploration tenements (EL5693, 5983 and 9587) cover approximately 504km2. EL5693, EL5983, EL9587, EL9595 and EL9596 are held by CMPL. CMPL has recently acquired the remaining joint venture interest from AuriCula Mines Pty Limited (“AuriCula”) covering the Shuttleton and Mt Hope Exploration Licence tenements south of Cobar (CMPL now 100% interest). CMPL previously held joint venture interests with Oxley Exploration Pty Limited (“Oxley”) in the Restdown, Restdown South, and Horseshoe tenements southeast of Cobar, but these interests have recently been reduced to a royalty-only interest, being a 1% net smelter return interest on any mineral or metallic product.

 

Land Tenure

 

CML5 occupies portions of five Western Land Leases (Nos. 9565, 731, 13844, 3667, 13844) and Crown Land including parts of the Cobar Regeneration Belt. MPL1093 and MPL1094 occupy Crown Land.

 

Native Title

 

The CSA mine lies within the traditional lands of the Ngemba/Ngiyampaa People. A Native Title claim by Ngemba, Ngiyampaa, Wangaaypuwan, and Wayilwan claimants was accepted for registration by the National Native Title Tribunal in April 2012 (NSD38/2019 and NC2012/001).  This claim is relevant to the CSA mine operation in that it intersects exploration and mining tenements held by CMPL or its subsidiaries.

 

The claim has not yet been fully determined, but as of September 2021, it has been agreed by parties to the Federal Court proceedings that Native Title has been extinguished over some 89% of land parcels within the Native Title claim area, which includes Western Lands Lease areas.  Native Title has been definitively extinguished over all land allotments lying within the boundary of CML5, but not the other ELs, and once the Native Title claim has been determined, it is likely that that the several parties holding interests in the land (including the State of New South Wales and CMPL or its subsidiaries will enter into an Indigenous Land Use Agreement to guide the future use and management of land and water within the Native Title claim area that covers the ELs.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 28

 

Table 3.1

 

CMPL Tenement Holding (February 2024).

 

Tenement Area Granted Expiry Status Details Holder
             
CML5 2,474ha 01/12/1993 24/06/2028 Current CSA Mine CMPL
MPL1093 16ha 05/02/1947 05/02/2029 Current MPL for water harvesting CMPL
MPL1094 14ha 05/02/1947 05/02/2029 Current MPL for water harvesting CMPL
EL5693 111 units 08/02/2000 07/02/2027 Current EL (CSA Regional) CMPL
EL5983 11 units 30/08/2002 30/06/2027 Current EL wholly within EL5693 CMPL
EL6223 13 units 05/04/2004 05/04/2029 Current EL(Shuttleton) CMPL
EL6907 11 units 11/10/2007 11/10/2027 Current EL (Mt Hope) CMPL
EL6140 24 units 22/10/2003 22/10/2026 Current EL (Restdown) - royalty interest Oxley Exploration Pty Ltd
EL6501 15 units 05/01/2006 01/01/2027 Current EL (Restdown South) - royalty interest Oxley Exploration Pty Ltd
EL6739 15 units 27/03/2007 27/03/2024 Pending* EL (Horseshoe 2) - royalty interest Oxley Exploration Pty Ltd
EL9587 46 units 20/07/2023 20/07/2029 Current EL (Tinderra) CMPL
EL9595 25 units 18/08/2023 18/08/2029 Current EL (Sugarloaf) CMPL
EL9596 35 units 18/08/2023 18/08/2029 Current EL (Ural) CMPL

 

Notes: CML = Consolidated Mining Lease; MPL = Mining Purpose Lease; EL = Exploration Licence; ELA = Exploration Licence Application; ha = hectare; in NSW one EL map unit is one minute of latitude by one minute of longitude or approximately 3km2. * Oxley has submitted a renewal application for a further three-year term for EL6739 to the Department of Regional NSW – Mining, Exploration & Geoscience; this renewal application is currently being assessed.

 

Joint Venture Interests

 

Joint Venture interests held by CSA are outlined for completeness, however, are not considered material for the purposes of this Report.

 

The ground within the Cobar Basin is tightly held with a number of active explorers. Operating and previously operating mines in the vicinity of CSA’s copper mine include the Endeavor lead-zinc mine (CBH Resources), Peak and Hera gold-copper mines (Aurelia Metals), and the Tritton copper mine (Aeris Resources) (Figure 2).

 

As well as the tenements held directly by CMPL (EL5693, EL5983, EL9587, EL9595 and EL9596), CMPL has tenements recently acquired from AuriCula Mines Pty Limited (AuriCula). Until recently CMPL also had a joint venture interest in tenements held by Oxley Exploration Pty Limited (Oxley) (Figure 2), but these interests have now been converted to a royalty-only interest.

 

AuriCula Acquired Tenements

 

Shuttleton (EL6223)

 

Shuttleton was a Joint Venture between CMPL (90%) and AuriCula (10%), a wholly owned subsidiary of International Base Metals Limited, and covers EL6223 which is located approximately 75km south of Cobar and 30km west of Aurelia’s Hera Mine (Figure 2). CMPL has recently acquired the remaining 10% interest from AuriCula. The EL includes the historic workings of Crowl Creek and South Shuttleton which produced around 3,000t of copper in the 1900s at average grades of around 5% Cu. Recent exploration has included acquisition of airborne magnetic and radiometric data and completion of soil and auger geochemical sampling and reverse circulation (“RC”) and diamond drilling. Structural interpretations have identified NW trending structures intersecting N-S structures beneath shallow residual cover, with the intersections considered favorable for mineralization. The geochemical surveys have also identified two anomalous zones coincident with favorable NW trending structures.

 

The Wirlong copper deposit lies just east of the Shuttleton tenement and is associated with the northwest oriented John Owen fault which also crosses the Shuttleton ground. The Mallee Bull copper-gold prospect lies 30km to the south. A systematic exploration program to test the potential for base metal mineralization is proposed for 2024.

 

Mt Hope (EL6907)

 

The Mt Hope tenements (Mt Hope North and Mt Hope South) lie approximately 130km south of Cobar (Figure 2) and include the historic Mt Hope and Great Central-Comet mines which produced around 10,600t of copper. Gold and silver mineralization has been identified at Anomaly 3 south of the Great Central prospect. Limited drilling (4 RC holes and 9 diamond holes) has been undertaken. Electromagnetic and magnetic surveys and soil sampling have defined several anomalies warranting further follow up and an auger drilling campaign and further geochemical and geophysical surveys are proposed for 2024.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 29

 

 

Oxley Tenements (Former Joint Venture)

 

Restdown, Restdown South and Horseshoe Joint Venture (EL6140, EL6739 and EL6501)

 

The Restdown, Restdown South, and Horseshoe Oxley tenements comprise EL6140, EL6739 and EL6501 (Figure 2). Exploration activities are managed by Oxley, a wholly owned subsidiary of Helix Resources Limited (“Helix”) and Glencore has not been contributing to the exploration expenditure apart from annual rents and levies. The tenements contain a number of prospects with potential for low grade gold associated with the Restdown Anticline. Recent drill results indicate limited potential for economically mineable resources. CMPL converted its former joint venture interest into a 1% net smelter return (“NSR”) royalty-only interest on 8 February 2022.

 

Water Rights

 

At present, CMPL holds an entitlement of 1,356 megalitres per annum (“MLpa”) of high security water under the Water Sharing Plan for the Macquarie and Cudgegong Regulated Rivers Water Source. These water licences are issued under the NSW Water Management Act 2000. However, during periods of serious drought, CMPL may not be able to access its full share of water under the water-sharing plan.

 

CMPL also holds groundwater entitlements. However, river water is preferred due to the levels of sulphates and the hardness of the ground water.

 

Two water storages that receive surface runoff from the catchments are located to the northwest of the mine, named Old Mine Dam North and South and held under Mining Purpose Leases MPL1093 and MPL1094 respectively.

 

A summary of CSA’s mine water licences is provided in Table 3.2.

 

Table 3.2

 

CSA Mine Water Licences

 

License Number Source Category Allocation
       
WAL36335 Macquarie and Cudgegong Regulated Rivers Water Source Regulated River – High Security 542.4 units  
WAL36336 Macquarie and Cudgegong Regulated Rivers Water Source Regulated River – High Security 813.6 units  
WAL28539 Lachlan Fold Belt Groundwater Source Aquifer 300 units  
WAL28887 Lachlan Fold Belt Groundwater Source Aquifer 210 units  

 

Royalties

 

State Royalty

 

In NSW, most minerals are owned by the state. Under the Mining Act 1992, royalties are payable on extracted minerals and royalty payments jointly managed by Mining, Exploration and Geoscience within the Department of Regional NSW, and Revenue NSW. For copper and silver mined at the CSA mine, an ad valorem royalty is calculated at 4 per cent of the value of production less allowable deductions.

 

Glencore 1.5% Cu NSR

 

As part of the sale consideration, MAC entered into a copper Net Smelter Royalty (“NSR”) in favour of Glencore. This is at rate of 1.5% for copper only based on the NSR received by CMPL for the life of the mine.

 

Oxley Tenements (Former Joint Venture)

 

CMPL converted its former Restdown, Restdown South and Horseshoe Joint Venture (EL6140, EL6739 and EL6501) interest into a 1% NSR royalty-only interest as of 8th February 2022.

 

Encumbrances

 

The QPs are not aware of any material encumbrances that would impact the current resource or reserve disclosures as presented herein.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 30

 

 

Permitting and Development Consents

 

CSA operates under several authorisations including:

 

Development Consents authorised by the Cobar Shire Council (CSC), under referral from other government departments

 

Landowner’s Consent authorised by NSW Department of Planning Infrastructure and Environment (“DPIE”)

 

Mine Tenements authorised by the NSW DPIE

 

Rehabilitation Management Plan (“RMP”) authorised by the NSW Resources Regulator

 

Environmental Protection Licence (EPL1864) authorised by the NSW Environmental Protection Agency (“EPA”)

 

Water Licences issued under the NSW Water Management Act 2000; responsibilities for authorising and managing water licences are shared between the Natural Resources Access Regulator (“NRAR”) and Water NSW; NRAR is responsible for compliance and enforcement of NSW Water Law including water access licence requirements

 

NSW Western Lands Lease and Property Vegetation Plans authorised by the Western Catchment Authority under the NSW Crown Land Management Act 2016.

 

Mining projects in NSW (including expansions or modifications of existing projects) require development consent under the NSW Environmental Planning and Assessment Act 1979 (“EP&A Act”).

 

The earliest statutory development consent held by CMPL for the CSA mine is Local Development Consent No. 31/95 and Amendment 97/98:33 approved by CSC in 1995 and 1998 which permits use of the CSA mine site by CMPL. Subsequent expansions and amendments of mining development at CSA mine have all been assessed and administered by the CSC.

 

Rehabilitation Management Plan (RMP)

 

Environmental aspects of mineral exploration and mining (including mine rehabilitation and closure) in New South Wales are administered under the NSW Mining Act 1992.

 

The recent introduction of the Mining Amendment (Standard Conditions of Mining Leases – Rehabilitation) Regulation 2021, requires large mines to have a Rehabilitation Management Plan (RMP). CSA Mine has completed an RMP and has had its Rehabilitation Objectives Statement approved by the NSW Resources Regulator. CSA, as the lease holder, will provide annual reporting and scheduling of rehabilitation via an Annual Report and Forward Programme (three-year period). This has replaced the previous requirement for an Annual Environmental Management Report (“AEMR”).

 

Environmental Protection Licence

 

The Protection of the Environment Operations Act (“POEO Act”) is the statutory instrument through which certain specified activities are regulated by the NSW Environment Protection Authority (EPA). Activities are administered by means of Environment Protection Licences (“EPLs”) issued to operators of the premises on which the activities occur. CSA currently holds EPL1864 authorising mining of minerals to a maximum annual production capacity of 2Mtpa. The EPL1864 has a current Environmental Risk Level of 1, with Level 1 being the lowest risk score.

 

The most recent EPL review was completed on 21 April 2021, with the next review due in five years on the 21 April 2026. There are no additional required activities by CSA and given the historical operations of the mine and long-standing, regular interactions with the regulator, no material changes are expected to occur as a result of these reviews.

 

Violations and Fines

 

The QPs are not aware of any current material violations or fines imposed under the Regulations of the Mining Act 1992 that apply to the CSA mine.

 

3.5Significant Factors and Risks That May Affect Access, Title or Right to Perform Work

 

With relation to mining titles, the QPs are not aware of any significant risks that may affect access, title, or the right or ability to perform work in relation to the CSA mine.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 31

 

 

4Accessibility, climate, local resources, infrastructure, physiography

 

4.1Topography, Elevation and Vegetation

 

The CSA mine is approximately 260m above sea level and is located in an area of low undulating north-northwest trending rises and is associated with a broad, prominent hill, Elouera Hill, which rises approximately 30m above the surrounding landscape. The mine lies close to the local drainage divide between the catchments of Sandy Creek in the southwest and Yanda Creek to the northeast.

 

The Cobar area has been impacted by mining and agricultural activities since the 1880s. The existing landscape surrounding the CSA mine is characterised by mining infrastructure, tailings storage facilities, shafts, disturbed grasslands and soil and rock stockpiles. The native vegetation of the area has been impacted by these activities with the historic removal of much of the native vegetation by clearing and over-grazing, resulting in erosion and extensive colonisation of the native vegetation. This has created a dense regrowth, referred to as ‘woody weeds’ or Invasive Native Species. The landscape has become highly modified and vulnerable to wind and water erosion, particularly those areas devoid of vegetation ground cover protection. The region surrounding the CSA mine is dominated by rangeland agriculture.

 

4.2Accessibility

 

The CSA mine is located 11km northwest of the town of Cobar, in western NSW, Australia (Figure 1), approximately 600km west-northwest of Sydney. The mine is accessed via sealed highways from Sydney to Cobar and sealed urban roads from Cobar to the mine site.

 

Roads

 

Road access to the mine site from Sydney is via National Highway No. A32, the Barrier Highway, a high-quality rural highway to Cobar and from there to the mine site on sealed urban roads.

 

Airstrip

 

Cobar is serviced by a sealed airstrip with commercial flights five times per week to and from Sydney.

 

Rail

 

The site is serviced by a rail line (Figure 1) which allows transport of concentrate product to the Port of Newcastle for export. Concentrate is loaded into rail wagons at the site and railed to Newcastle along the NSW rail network. Railing to Port Kembla, south of Wollongong, is also an option.

 

4.3Climate

 

The climate of Cobar is semi-arid with evaporation typically exceeding rainfall by a ratio of 6:1. The mean annual rainfall for Cobar is approximately 400mm. During summer months, maximum temperatures typically range between 28-39ºC and during the winter months, maximum temperatures typically range between 13-20ºC. Minimum temperatures in the winter months typically range between 5-9ºC. Rainfall and temperature records have been recorded from May 1962 and evaporation from November 1967.

 

4.4Infrastructure

 

Power Supply

 

Power supply to the site is via a 132kV transmission line from Essential Energy’s western NSW network. The Essential Energy network is supplied by a mix of conventional and renewable power generation, including the 102 megawatt (“MW”) and 132MW solar farms in the nearby towns of Nyngan and Nevertire. A 22kV line is also connected to the site from Cobar and is available for limited supply in emergencies.

 

Water Supply and Water Pipelines

 

The majority of water supply for the operation is provided by the Cobar Water Board from a weir on the Bogan River at Nyngan (Figure 1) through a network of pumps and pipelines. Additional water is available from tailings water recycling, surface water capture and a borefield installed in 2019. Water demand is around 3 megalitres per day (ML/day) in summer, with most water supplied by the Cobar Water Board system. The borefield has capacity for up to 1.3ML/day. The Cobar Water Board system is adequate to supply the operation up to around 1.4Mtpa; the borefield is only required during periods of drought or should a plant feed rate in excess of 1.4Mtpa be considered for extended periods.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 32

 

 

Additional water can be secured by replacing the pipeline from the Cobar Water Board system to the mine site that currently has approximately 20% transmission losses.

 

Workforce Accommodation

 

The majority of the workforce is accommodated in Cobar with some senior staff employed on a fly in/fly out (FIFO) or drive in/drive out (DIDO) arrangement. No workforce accommodation is provided at the mine site itself, however, the Company owns and leases various properties in Cobar.

 

Site Buildings and Services

 

Site buildings comprise site offices, warehouses, and services buildings. Site services include power and water reticulation facilities, communications systems and fuel storage and dispensing facilities.

 

Tailings Storage Facility

 

CSA mine currently operates one tailings storage facility, the South Tailings Storage Facility (STSF) (Figure 4), comprising the main STSF (approximately 63ha) and the STSF Extension (19ha). In 2010, the STSF was upgraded to alter the deposition method to a central depositional system. This method provides substantial water savings and will result in a final landform more amenable to rehabilitation. There will also be a reduction in the requirement for suitable material for tailings dam wall lifts and final capping; final topsoil requirements for rehabilitation will be lower than with the old multi-spigot perimeter depositional method and there will be an increase in tailings dam integrity as the resultant solids will contain less moisture.

 

After several lifts of the perimeter embankment, the current wall lift (Stage 9) is expected to have deposition capacity through to February 2025. Two further perimeter embankment raises (Stage 10 and 11) are scheduled on the STSF, before establishing a new facility. Stage 10 (Development approval received) and 11 (pre-planning underway) will provide storage capacity until approximately 2032 (at a nominal 1.4 Mtpa production rate). Studies completed by CSA’s engineer of record have identified long term tailings storage options (including the potential use of the NTSF) to cater for an extended mine life well beyond the current Reserve mine life. Works are underway to refine preliminary designs, estimates and determine the preferred option.

 

Tailings from the process plant flotation circuit are thickened in a high-rate thickener, and the underflow is sent to the paste fill plant or to the STSF. Supernatant water is collected in a dedicated decant dam for recycling to the process plant circuit.

 

The STSF is being operated proficiently, exhibiting no substantial concerns regarding the facility's structural integrity. Concurrently, CSA is approaching the finalisation of buttressing at designated positions along the STSF perimeter embankment. This is aimed at improving Factor of Safety (FOS) criteria under Post-Seismic (Liquefied Strength) conditions. The North Tailings Storage Facility (NTSF) (132.9ha) which lies adjacent to the northern boundary of the STSF, has been decommissioned and has been excised from the CSA Mine Lease (CML5); NTSF is owned by, and is the responsibility of, the New South Wales government. Initial discussions between the Company and the applicable government agencies have indicated that the government would support reclamation of the NTSF, should the Company decide that the NTSF was the preferred long-term tailings storage solution.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 33

 

 

 

Figure 4MINE SITE LAYOUT PLAN
BDA - 0230-04-April 2024Behre Dolbear Australia Pty Ltd

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 34

 

 

5History

 

5.1Previous Operations

 

The CSA deposit was discovered in 1871 and named after the nationalities of its initial owners (a Cornishman, a Scotsman and an Australian). Development began in the early 1900s, but it was not until 1961 that a significant resource was proven up by Broken Hill South Pty Ltd. The site transitioned to an underground operation in 1965 with first underground production in 1967.

 

The mine was acquired by Conzinc RioTinto Australia Pty Ltd in 1980 and sold to Golden Shamrock Mines Pty Ltd (GSM) in 1993. GSM was subsequently acquired by Ashanti Gold Fields in the same year and the mine continued to operate until 1997, when the operation ran into financial difficulties and was placed in receivership.

 

The CSA mine was acquired by Glencore in 1999. Cobar Management Pty Limited (CMPL), a wholly owned Australian subsidiary of Glencore Operations Australia Pty Ltd, itself a wholly owned subsidiary of Glencore, was the direct owner and operator of the mine (and is the entity acquired by MAC). As part of its acquisition in 1999, Glencore received a number of concessions from the NSW government, whereby several components of the previous mining operations were excised from the mining lease such that no liability arising from these components transferred to CMPL. The excised components included the Northern Tailings Storage Facility (NTSF), a mine subsidence area and adjacent waste rock dumps.

 

Underground operations were resumed, and the mine was operated under Glencore management for over 20 years until being acquired by the Company on 16 June 2023.

 

5.2Recent Production History

 

CSA is one of Australia’s deepest underground mines, extending to 1.9km in depth and Australia’s highest grade copper operation. Mine production in 2023 totalled approximately 36kt of copper and 429koz of silver (“Ag”) in copper concentrates. Table 5.1 shows the historical production over the last six years.

 

Table 5.1

 

CSA Mine – Production History 2018-2023

 

Description  Unit   2018   2019   2020   2021   2022   2023 
Ore Mined   kt    1,004    1,103    1,224    1,066    1,033    1,049 
Ore Grade   % Cu    4.57    4.01    3.78    3.70    3.68    3.38 
Waste Mined   kt    255    346    317    160    235    276 
Total Material Moved   kt    1,260    1,450    1,541    1,225    1,268    1,325 
Ore Milled   kt    1,002    1,105    1,224    1,062    1,033    1,062 
Milled Grade   % Cu    4.57    4.01    3.84    3.90    3.68    3.48 
Contained Copper   kt    49.5    44.2    46.9    41.4    38.0    36.2 
Copper Concentrate Tonnes   kt    171.6    162.9    172.2    157.3    144.4    155.5 
Copper Concentrate Grade   % Cu    26.1    26.7    26.8    25.8    25.8    25.4 
Copper Recovery to Conc.   % Cu    97.6    98.4    98.2    97.9    97.9    97.8 
Cu Production   kt    44.8    43.5    46.2    40.5    37.3    36.1 
Ag Production   koz    459    462    516    459    446    429 

 

5.3Historical Exploration

 

After the initial discovery in 1871 a further discovery of copper-rich ore occurred in 1905, however, a slump in metal prices and an underground fire led to the closure of the mine in 1920. Zinc Corp Ltd (through its subsidiary Enterprise Exploration) explored the area from 1947 to 1957 and commenced re-development work in 1952. Cobar Mines Pty Ltd was created in 1956, mining recommenced in 1962 and production commenced in 1965 from the Eastern (Cu-Zn) and Western (Pb-Zn-Ag) System lenses.

 

The QTS System was discovered in the mid-1970s with the QTS North lenses becoming the main source of the copper ore. The previous owners of the CSA Mine, Conzinc RioTinto of Australia (CRA) in 1980, Golden Shamrock Mines (GSM) in 1993 and Glencore in 1999, all undertook various exploration activities including geochemical and geophysical data acquisition, shallow RC drilling and deeper diamond drilling.

 

Extensive geochemical soil sampling was undertaken across CML5 in the mid-1970s, 1993 to 1995, and from 2006 to 2008. Pulps from these campaigns have been re-assayed for multi-elements with current laboratory methods in 2021.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 35

 

 

Geophysical surveys across CML5 include early two-dimensional induced polarization (“2DIP,”), ground magnetics and gravity, airborne electromagnetics (“EM”), and more recent induced polarization (“IP”) and resistivity; magnetotelluric (“MT”) data was acquired by Geophysical Resources and Services Pty Ltd (“GRS”) using the M.I.M Distributed Acquisition System (MIMDAS). Ongoing surveys include downhole electromagnetics (“DHEM”) of diamond drill holes and fixed loop EM (“FLEM”) surveys in 2021 and 2022.

 

Refer to Section 7.2 for additional information on non-drilling related exploration.

 

The CSA deposit has been drilled using fully cored diamond drill holes drilled either from surface or underground, primarily using NQ size core (47.6mm diameter). The deposits have been defined by over 6,800 holes totalling approximately 1,000km of core, although data from many of the historical drill holes is not used for current resource estimation, being located in the upper mined-out levels of the deposit. Drilling ranges from as far back as 1950 to the present; however, the bulk of the drilling contributing to resource estimation has been completed since 2000. The diamond holes for estimation prior to 2000 are located predominantly in the upper levels and represent around 51% of drill meterage; diamond drilling post 2000 is focussed principally on the lower levels and represents approximately 49% of drill meters. The average drillhole depth is approximately 160m (surface and underground) with the maximum over 1,100m.

 

Relatively shallow RC drilling along strike of the mine to the north and south has delineated geochemically anomalous zones from prospects such as Spotted Leopard and Pink Panther south of the mine to prospects GSM and Kendi north of the mine, and Western Gossan and Block 19 immediately west of the mine.

 

Diamond drilling around the mine (such as at Western Gossan and QTS North), and at prospects such as Tailings Dam and Stoney Tank on the eastern side of CML5, has continued to intersect base metal mineralization.

 

Table 5.2 summarizes the various types of surface and underground drilling conducted at CSA over the last ten years.

 

Table 5.2

 

Surface and Underground Drilling History

 

Drilling Type  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  Total 
Diamond Drilling
(Surface Exploration)
   396   -   1,972   9,540   13,158   27,114   15,001   7,285   -   5,268   9,922   89,656 
RC Drilling
(Surface Exploration)
   -   -   -   -   19,533   13,343   2,188   1,935   -   -   1,140   38,139 
Infill/Extension/Upgrading (Underground)   18,439   15,020   9,991   12,864   17,592   23,706   13,023   23,832   22,151   26,645   28,029   211,292 
Exploration (Pure) (Underground)   -   578   -   -   -   692   -   300   -   -   700   2,270 
Geotechnical (Underground)   -   1,654   3,470   617   2,867   625   1,475   1,723   253   -   450   13,134 
Infrastructure (Underground)   1,085   265   597   -   1,130   -   -   37   889   761   397   5,161 
Total (Surface + Underground)   19,920   17,517   16,030   23,021   54,280   65,480   31,687   35,111   23,294   32,674   40,638   359,652 

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 36

 

 

6Geological Setting, Mineralization and Deposit

 

6.1Regional Geology and Mineral Deposits

 

The CSA mine has a long history of exploration and operations and the geology is well documented and generally well understood. The CSA deposit is located within the Cobar mineral field, in the Cobar Basin (Figure 5). Mineralization is hosted in the Silurian-age CSA Siltstone, a member of the Amphitheatre Group of the Cobar Supergroup sequence of rocks and is associated with zones of deformation and shearing. The CSA Siltstone consists of a sequence of rhythmic bedded siltstones and sandstones. The rock sequence was structurally deformed during the development of the Cobar Basin in the early Devonian period.

 

The Cobar mineral field is a mineralized belt 80km north-south and up to 40km wide, containing copper, gold, and lead-zinc mineralization along the eastern margin of the Cobar Basin, one of many north-south grabens that developed in the Lachlan Fold Belt (“LFB”) during the Siluro-Devonian period. The LFB is a complex orogenic belt which developed at the margins of an evolving tectonic plate. Regional crustal extension of the LFB in the late Silurian created a series of north-south trending deep water basins and troughs that, in the Cobar region, included the Cobar Basin and further south the Raast and Mt Hope Troughs. The Cobar Basin is fault bounded on all sides and studies indicate that reactivation of the faults played a significant role in providing fluid pathways for mineralizing fluids and dilational zones for the formation of the mineral deposits.

 

Rocks of volcanic derivation are rare, and igneous intrusions are limited to a few small porphyritic bodies at the southern extremity of the field. Rocks in the Cobar Basin have undergone low grade regional metamorphism to lower greenschist facies.

 

The Cobar Basin is a well-endowed metalliferous province with a diverse range of, predominantly sediment-hosted, mineral deposits. Most of the known deposits are located adjacent to the eastern, fault-controlled, basin margin. Significant deposits from north to south include the Endeavor silver-lead-zinc deposit, the CSA copper deposit, The Peak, Perseverance, New Occidental and New Cobar gold-copper deposits, the Nymagee copper-lead-zinc deposit, the Hera gold-copper-lead-zinc deposit, and the Mineral Hill gold-copper deposit.

 

The known mineral deposits are all structurally controlled and typically occur as narrow, short strike length pipes, lenses and veins (i.e. a small surface area) but are notable for their considerable vertical extent. The location of the deposits along or adjacent to the basin margin Rookery Fault and sub-parallel faults suggests migration of fluids from basement sources up the basin margin fault.

 

6.2Stratigraphy

 

The principal operating mines in the area are CSA (Cu with minor Pb/Zn), Endeavor (Pb/Zn/Ag), The Peak (Au/Cu), Hera (Au/Cu), and Tritton (Cu) (Figure 1 and Figure 2). The deposits of the Cobar field occur exclusively within the Nurri and Amphitheatre Groups of the Cobar Supergroup (see Table 6.1). The Nurri Group unconformably overlies, and is in faulted contact with, basement rocks of the Cambro-Ordovician Girilambone Group, along the eastern margin of the Cobar Basin. The Nurri Group comprises the basal Chesney Formation, consisting of a thick turbidite sequence with a coarse basal conglomerate, and the Great Cobar Slate, consisting predominantly of mudstones, siltstones, and fine-grained sandstones. South of Cobar, the contact between the Chesney Formation and the Great Cobar Slate is locally faulted, and this contact hosts a number of gold deposits in a series of en-echelon sub-vertical shears.

 

The Amphitheatre Group, a deeper water facies to the west, partially interfingers with, and partially overlies, the Nurri Group. At the base of the Amphitheatre Group is the CSA Siltstone, which consists of a thinly bedded turbiditic sequence of carbonaceous siltstones and mudstones with fine-grained sandstones. The CSA Siltstone is the only unit of known economic significance within the Amphitheatre Group and hosts the CSA and Endeavor mineralization.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 37

 

 

 

Figure 5COBAR REGIONAL GEOLOGY
BDA - 0230-04-April 2024Behre Dolbear Australia Pty Ltd

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 38

 

 

Table 6.1

 

Cobar Stratigraphic Column

 

Group Formation Age Description
       
Cobar Supergroup   Siluro-Devonian  
Winduck Group     Shallow marine shelf deposits.
Amphitheatre Group

Upper Amphitheatre Group

Biddibirra Formation

CSA Siltstone

  Turbidites, shales, siltstones, sandstones; CSA Siltstone is host to base metal mineralization at CSA mine and Endeavour mine.
Nurri Group

Great Cobar Slate

Chesney Formation

  Turbidites, conglomerates, mudstone, siltstone, sandstone; host to gold mineralization at The Peak, New Occidental and New Cobar.
Kopyje Group     Shallow marine shelf deposits and minor volcanics, predominantly along the eastern margin of the Cobar trough.
Girilambone Group   Cambro-Ordovician Turbidite sequence with minor volcanics, deformed and metamorphosed; Silurian granitoid intrusions.

 

Note: marked unconformity between Cambro-Ordovician and Silurian sediments

 

6.3Local and Property Geology

 

The CSA mineralization occurs in five known systems: Eastern, Western, QTS North (QTSN), QTS Central (QTSC) and QTS South (QTSS) (Figures 3 and 6). The mineralization is structurally controlled, associated with fault/shear zones and arranged in an en-echelon pattern. The Cobar Fault and the Chesney Fault are the major controlling faults at the CSA mine. The mineralized systems occur at the intersections of two sets of steeply dipping (~85°) structures, a dominant north-northeast (“NNE”) trending set (S1) and a NNW trending set (S2). These two structural trends formed due to east-west compression leading to a complex fault/shear system with dilation zones (S3) at intersections. The NNE shears can be up to 100m wide and contain parallel quartz veining of variable intensity.

 

Within the five mineralized systems, multiple lenses of mineralization occur; lenses typically are 5-30m wide, have short (<300m) strike lengths but long vertical continuity down plunge (>1,000m). The lenses are interpreted by CMPL as discrete parallel to sub-parallel stacked lenses (Figure 6).

 

The host rock for the mineralization, the CSA Siltstone, contains thinly bedded siltstones and mudstones with fine to medium grained sandstones. Bedding strikes north-northwest and dips steeply west. Cleavage trends north and dips steeply east.

 

QTSN is developed from 600m below surface and is the main mineralized system at CSA, currently containing around 63% of the total copper metal in the estimated Mineral Resource and accounting for approximately 80% of current production tonnes. QTSN consists of around 30 separate lenses which trend north-south and extend down plunge from 600m to >2,000m. To date, the deepest mineralized intercept at QTSN is at around 8,050m Relative Level (“RL”), 2,200m below surface with surface at 10,250mRL. The main lenses consist of semi-massive to massive chalcopyrite bounded to the north and south by zones of chalcopyrite and quartz veining.

 

QTSC was discovered in 2014; it is located 300m south of QTSN and is developed from a depth of around 1,200m below surface (Figure 6). The system consists of two principal lenses with strike lengths of 150m and widths of 10m.

 

QTSS is located approximately 200m south of QTSC at a depth of around 700m below surface. QTSS is essentially mined out except for the QR1 lens which was discovered in 2005. This lens lies below and to the south of the mined-out area and has a down plunge extent in excess of 400m, a strike length of 90m and a maximum width of 15m. The mineralization consists of a zone of quartz-chalcopyrite-chlorite veining.

 

The Eastern system is located 100m west of QTSN, starting at 250m below surface and consisting of two principal lenses with strike lengths of 50-80m and widths of 10m. Copper mineralization occurs as quartz-sulphide veining in chlorite-altered siltstone, with occasional pods of massive sulphide.

 

The Western system outcrops at surface and approximately the upper 100m of the sulphide mineralization has been oxidised. The system is hosted in pervasively silicified and chloritized siltstone. Mineralization occurs as zones of quartz-sulphide veining with a number of small high-grade pods of copper or lead-zinc. The lead-zinc mineralization is concentrated in the upper portion of the system with copper dominant at depth. There are four narrow, copper-rich lenses which have a strike length of around 45m, an average width of 7m and extend down plunge up to 200m.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 39

 

 

6.4Mineralization and Alteration

 

Chalcopyrite (CuFeS2) is the dominant copper sulphide phase in all five systems. Copper mineralization occurs in three distinct forms: as massive sulphide with dominant chalcopyrite and minor pyrrhotite (iron sulphide) and cubanite (CuFe2S3), as semi-massive sulphide with either quartz or chlorite alteration and associated with quartz-sulphide veining of variable intensity. Massive sulphide contacts can be sharp, but the majority of mineralized lenses have gradational contacts with a mineralization envelope occurring around the more massive mineralization.

 

Cubanite is present as a minor copper species, mainly in QTSC. Sphalerite (zinc sulphide) and galena (lead sulphide) are also present but principally only in the upper part of the Western system which is the only system of the five that is exposed at surface. There are no lead-zinc lenses included in the CSA Mineral Resources or the Cube re-stated Mineral Resource. Silver (Ag), grading 10-50 grams per tonne (“g/t”) is present as acanthite (Ag2S) and shows a weak to moderate correlation with copper. Good metallurgical recoveries are achieved, and a high-quality copper concentrate produced grading around 26-27% Cu with silver credits.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 40

 

 

 

Figure 6GEOLOGY SECTION PROJECTION - LOOKING NORTH
BDA - 0230-04-April 2024Behre Dolbear Australia Pty Ltd

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 41

 

 

7Exploration

 

7.1Historical and Current Drilling

 

The CSA deposit was discovered in 1871 with a further discovery of copper-rich mineralization in 1905, however, a slump in metal prices and an underground fire led to the closure of the mine in 1920. Zinc Corp Ltd (through its subsidiary Enterprise Exploration) explored the area from 1947 to 1957 and commenced re-development work in 1952. Cobar Mines Pty Ltd was created in 1956, mining recommenced in 1962 and production commenced in 1965 from the Eastern (Cu-Zn) and Western (Pb-Zn-Ag) System lenses.

 

The QTS System was discovered in the mid-1970s with the QTS North lenses being main source of the copper ore at the time. CMPL came under the ownership of Conzinc RioTinto of Australia (CRA) in 1980, Golden Shamrock Mines (GSM) in 1993 and Glencore in 1999. During this time, there have been ongoing periods of geochemical and geophysical data acquisition, shallow RC drilling and deeper diamond drilling.

 

Extensive geochemical soil sampling was undertaken across CML5 in the mid-1970s, 1993 to 1995, and from 2006 to 2008. Pulps from these campaigns were re-assayed for multi-elements with current laboratory methods in 2021.

 

Geophysical surveys across CML5 include early 2DIP, ground magnetics and gravity, airborne EM, more recent IP/MT (MIMDAS), ongoing DHEM of diamond drill holes and fixed loop EM (FLEM) in 2021 and 2022.

 

Relatively shallow RC drilling along strike of the mine to the north and south has further delineated geochemically anomalous zones from prospects such as Spotted Leopard and Pink Panther south of the mine to prospects GSM and Kendi north of the mine, and Western Gossan and Block 19 immediately west of the mine. (Figure 7). Diamond drilling around the mine (such as at Western Gossan and QTS North), and at prospects such as Tailings Dam and Stoney Tank on the eastern side of CML5, has continued to intersect base metal mineralization.

 

The CSA deposit has been drilled using fully cored diamond drill holes drilled either from surface or underground, primarily using NQ size (47.6mm diameter core). The deposits have been defined by over 6,800 holes totalling approximately 1,000km of core. Data from many of the historical drill holes is not used for current resource estimation, being located in the upper mined out levels of the deposit; current resource estimates are based on approximately 2,932 drill holes and more than 71,000 samples. Underground diamond drilling over the last five years has averaged 23,000m per year, with an average rate of 27,700 m per year achieved over the last two years.

 

7.2Exploration – Non-Drilling

 

Geophysical Surveys

 

Airborne Electromagnetic Surveys

 

In 2001, the entire extent of CML5 was included within a much more extensive ‘HOISTEM’ survey, which covered ~70% of surrounding tenement EL5693, for a total of 1,874line-km; the survey was carried out under the direction of consultant geophysicist Steve Collins whose report on the results forms the basis of the comments below. The Normandy HOISTEM helicopter-borne electromagnetic (EM) system comprised a single wire 20m diameter transmitter loop with a centrally mounted receiver slung beneath a helicopter, as such the system is symmetric with respect to flight direction. Survey parameters comprised 100m spaced east-west lines flown with a nominal detector terrain clearance of 30m. The receiver recorded 112 channels of off-time decay signal each of which is 112.7 microseconds in duration. The measured decay signals were binned into 10 groups.

 

At the time of this survey, the HOISTEM system was still in development. A change was made to the electronics of the system half-way through this survey, resulting in significantly lower noise levels which are apparent in images of the data for the later time groups. The contractor carried out standard processing to remove bird swing and system self-response, but grouped results were found to still contain some system noise which manifested itself as a corrugation in the presentation images. The data were passed through a decorrugation micro levelling process to produce shaded enhanced images for interpretation.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 42

 

 

 

Figure 7NEAR MINE EXPLORATION TARGETS
BDA - 0230-04-April 2024Behre Dolbear Australia Pty Ltd

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 43

 

 

In 2019, the Government of NSW and Geoscience Australia flew an Xcite Airborne Electromagnetic (“AEM”) survey at a height of 60m, with the sensor suspended 30m below, along 116 east–west lines. The lines were typically about 55km long and between 2.5km and 5km apart. A total of 9-lines of the 2019 Xcite AEM survey covered the area of the 2001 HOISTEM; comparison showed the 2001 HOISTEM and high quality 2019 AEM data agree well in the early EM channels (0.4-1.2ms). This upgraded the reliability and usefulness of the 2001 HOISTEM AEM data and has been reliably used to identify and interpret geophysical signatures that might be associated with prospective structures and enhanced weathering due to sulphides at depth or lithological variations.

 

2005 Mopone IP-Resistivity Survey

 

The eastern section of CML5 covers part of an extensive offset pole-dipole IP-resistivity survey undertaken by Search Exploration Services Pty Ltd in March 2005 under the direction of consultant geophysicist Steve Collins. The offset pole-dipole array comprises a central line of 100m transmitter electrodes (each in turn connected to a single remote electrode) with a parallel line of receiver dipoles on either side. Line spacing for this survey was 200m; transmitter electrode spacing and receiver dipole size was 100m. The data was processed to 3D inversions on completion of the survey, but degraded by the effects of receiver cabling problems, not all of which could be resolved. The data were further processed to 2D IP and resistivity offset inversion sections in-house in 2020; some, but not all of the data problems were resolved. These inversions were converted to a format suitable for importation into a 3D LeapFrog geological model.

 

The Mopone magnetic anomaly coincides with a resistive zone at depth; no significant IP anomalism was noted. The configuration of the offset pole-dipole array means that the shallowest sections of the area could not be resolved in any detail.

 

2006 – 2007 MIMDAS Survey

 

Following a successful trial of 3D MIMDAS in early 2006, 2D MIMDAS surveys were conducted to the north and south of the CSA Mine; principally targeting the Cobar Fault. IP, resistivity and MT data were acquired by Geophysical Resources and Services Pty Ltd between the 4th of December 2006 and 14 November 2007 using the M.I.M Distributed Acquisition System (“MIMDAS”). Approximately 22line-km of these surveys were within CML5. A “standard” 2D MIMDAS pole-dipole/ dipole-pole IP configuration was used with dipole spacing 100m and line spacing 400m. Initial inversion modelling of data from the North Block has been completed with good indication of structure, although often poorly resolved.

 

MIMDAS IP and MT Data from the CSA Mine was inverted to return possible causative models. It is believed that the MIMDAS survey has detected the ore package with the DC Resistivity and MT methods. The technique as implemented at CSA would seem to be able to locate any similar deposit in a similar geological regime to approximately 500m depth. If the survey area was centred over the known system proper, it is anticipated that resolution of individual conductors might have been gleaned from the inversion results. The data, particularly the chargeability data, although of very good quality in a repeatability sense, has proven difficult to interpret due to contamination from EM effects. The mineralization packages to the south of the survey area are most likely responsible for this contamination. However, with the EM signature being so unique, it may be able to be used in a comparative exploration sense. Less conductive deposits would lend themselves to detection by the induced polarisation method as EM effects would not dominate the secondary voltage decays as has been the case at CSA. A resistivity anomaly occurring on the south-eastern limits of the survey area has been detected and noted.

 

2012 – 2019 Ground Gravity

 

CMPL commissioned Precision Exploration Services between 2012 – 2019 to collect ground gravity data across CML5 and over the Cobar and Chesney Faults on EL5693. Gravity data was collected using a Lacoste & Romberg Model “G” gravity meter, on 100m x 100m grids, with 50m x 50m grid infills to the north and south of the CSA Mine and over the Mopone prospect on the eastern margin of CML5. The gravity data has proved useful for mapping structures, particularly NNE and NNW crosscutting structures, which have a controlling factor on mineralization at the CSA Mine.

 

Between the 1970 – 1990 Cobar Mines and CRAE collected ground gravity data using a Lacoste and Romberg (L & R) Model G Land Gravity Meter with data collected every 30m-50m along east-west lines 300m-400m apart, plus infill stations across CML5 and surrounding tenement EL5983. MIM Geophysicist, Terry Harvey, reprocessed the 1970 – 1990 and recent CMPL gravity data to produce composite products,

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 44

 

 

2020 Airborne Magnetics and Radiometrics

 

Thomson Aviation Pty Ltd were engaged to undertake an Airborne Magnetics and Radiometrics (“AMR”) survey covering EL5693, which encompasses CML5. The survey was completed on 50m spaced east-west orientated lines, with 500m spaced north-south tie lines, at a nominal survey height (terrain clearance) of 35m. Survey equipment specifications are summarized below:

 

The survey provided agreement with previously mapped regional structures, will deliver increased structural understanding of the region surrounding CML5 and will form a basis for future planning of exploration programs.

 

2021 – 2022 FLEM

 

Gap Geophysics Australia Pty Ltd (“GAP”) were commissioned to conduct a Fixed-Loop Electromagnetic Survey (FLEM) encompassing the CSA mine between May 2021 and February 2022. The survey employed one of GAP’s high-power EM systems which consisted of a GeoPak HPTX-70 or HPTX-80 transmitter and two setups of an EMIT SMARTem24 receiver coupled with a 3-component Supracon High-temperature Super-conducting Quantum Interference Device (“SQUID”) sensor. The survey consisted of 24 loops (~1200m x 900m), 50m east-west spaced stations on 100m north-south spaced lines, for approximately 11-lines per loop, in total the survey covered approximately 26km2 of highly prospective ground encompassing the CSA mine and along strike.

 

The survey was a technical success in its ability to detect previously known mineralization at Pink Panther, located 1km to the south of CSA. Subtle FLEM anomalies have been detected north along strike of CSA that coincide with geochemical anomalism suggestive of QTS-style sulphide mineralization at depth; these anomalies will be targeted in the 2024 Diamond Drilling Campaign.

 

Down Hole Surveys

 

Down-hole electromagnetic surveys (DHEM) are proven to be an effective method for detecting Cobar-style mineralization, since 2016 DHEM surveys are conducted on completion of diamond drilling campaigns. DHEM surveys post 2000 have been undertaken by Outer Rim Exploration Services Pty Ltd, GEM Geophysical Surveys Pty Ltd and Gap Geophysics Australia Pty Ltd, all data is available and of moderate to very good quality. Summary of recent DHEM surveys follow.

 

2018 CSA Mine DHEM Survey

 

Down-hole electromagnetic (DHEM) surveys were completed in August 2018 by Gap Geophysics Australia Pty Limited (GAP), a total of 10,490m was logged on fourteen drillholes over five near-mine prospects (Kendi, Pink Panther, Spotted Leopard, QTS North and QTS South. The survey utilized a Digi Atlantis DHEM sensor, Smartem receiver and Gap Geopak HPTX-802 transmitter. The EM responses along three mutually orthogonal vectors (A, U, V) were measured by the down-hole probe.

 

The DHEM surveys have produced fair to good quality data. A total of fourteen holes were surveyed with DHEM with six holes containing anomalies, three of which being off-hole anomalies at the QTS North prospect that warranted drill testing. The conductors modelled at the QTS North prospect were diamond drill tested in early 2023.

 

2020 QTS South DHEM Survey

 

Down-hole electromagnetic (DHEM) surveying of nineteen holes at the QTS South (upper) deposit and one historic hole (DDHSL7) at the Pink Panther prospect were carried out by Gem Geophysics in September 2020. The survey utilized a Digi Atlantis DHEM sensor, Smartem receiver and Geonics TT100 transmitter. The EM responses along three mutually orthogonal vectors (A, U, V) were measured by the down-hole probe. A total of 9,935m was surveyed at a station interval ranging from 2.5m-15m. The surveys were designed to test for off-hole conductive mineralization and for extensions to the known chalcopyrite mineralization.

 

The DHEM surveys have produced fair to good quality data. The DHEM data collected from within and close to the known mineralization is consistent with the results from the 2018 DHEM surveys. A total of twenty holes were surveyed with DHEM and seven of these holes contained anomalies that warranted modelling. Data returned from seven holes contained anomalous electromagnetic (EM) responses that warranted modelling. Six of these EM responses were modelled at QTS South Upper deposit and provided small southern extensions to the mineralization or occur in zones indicating greatest grade or thickest intervals, however current drilling closes these zones, no further drilling is currently warranted. Modelled conductors from drillhole QSDD040 returned a relatively high modelled conductance and could represent grade mineralization immediately south and east of the QTS South orebody, these conductors were drill tested in 2023.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 45

 

 

Geochemistry

 

Throughout the early 1970s, Rotary Air Blast (“RAB”) geochemical campaigns were conducted over CML5 and the surrounding tenement EL5693. The programs were typically conducted on 30m spaced east-west by 300m spaced north-south grids, with infill lines at 150m north-south spacing. The 1970 campaigns proved successful in identifying geochemically anomalous areas within CML5 such as the GSM, Stoney Tank, Falcon, Block 19 and QTS South to Spotted Leopard trend. Other than the QTS South to Spotted Leopard trend, the remaining prospects have received minimal attention and exploration since being identified.

 

Between 2003 – 2007, CMPL undertook power auger geochemical surveys on 50m x 50m sample grids in the near-mine area and 100m x 100m grids on regional prospects within CML5. In total 2,032 power auger samples were collected by CMPL and analysed by ME-MS43i (Three Acid Digest) for 21 elements, with eastern CML5 pulps having been re-assayed in 2021 -2022 by ME-MS61 (Four Acid Digest) for 48 elements plus Au by fire assay. The anomalies identified in the 1970s geochemical campaigns correlate well with early 2000 geochemical surveys; the multi-element data has proved useful in delineating new mineralization on CML5. Base metal mineralization within the Cobar region typically has geochemical haloes that extend less than 100m in residual soils. Soil sampling conducted around the CSA Mine shows a weak and sporadic Cu anomaly 100ppm – 550ppm and a more consistent Pb anomaly 100ppm – 2960ppm, which extends to a maximum of 200-250m from mineralization, most notably around the Western Gossan. The 2023 diamond drilling campaign represented the first phase of testing high priority geochemical anomalies adjacent to regional scale structures and in zones of structural complexity highlighted from the 2020 AMR survey. Geochemical surveys have proved highly successful in the Cobar Basin at detecting blind orebodies.

 

7.3Exploration – Drilling

 

The CSA deposit has been drilled using fully cored diamond drill holes drilled either from surface or underground, primarily using NQ size (47.6mm diameter core). The deposits have been defined by over 6,800 holes totalling approximately 1,000km of core. Data from many of the historical drill holes is not used for current resource estimation, being located in the upper mined out levels of the deposit; current resource estimates are based on approximately 2,932 drill holes and more than 71,000 samples. Underground diamond drilling over the last five years has averaged 24,200m per year, with an average rate of 26,600 m per year achieved over the last two years (Figure 8).

 

Resource definition drilling in active mining areas at QTSN is carried out with a drill hole spacing of around 20m north-south by 37.5m vertical. At QTSC, QTSS, Western and Eastern mineralized systems, drill hole spacing is nominally 20m north-south by 20m vertical due to the narrower mineralized lenses. Wider drill hole spacing is used in exploration areas.

 

The mineralized host rocks are generally very competent below the weathered zone and core recovery averages above 95%. All CSA drill holes are systematically surveyed (drill collars and down hole) and geologically and geotechnically logged and photographed. Drill hole logging includes recording lithology, structures, weathering, alteration, and rock quality designation (“RQD”). Drill core is nominally sampled at one meter intervals, while honouring lithological contacts. Half-core samples are sent for sample preparation and assaying.

 

Surface Drilling

 

The current database of surface drilling lists some 412 RC drill holes totalling 52,818m with an average depth of around 128m (Figure 9). RC holes have generally been drilled to 120m to 150m depth, being just past the weathered zone and into fresh rock, although some RC holes have been drilled to as deep as 250m.

 

Historically, some 18 shallow RC holes were drilled in 1984 (under CRA ownership) into Block 19 which is a NNW base metal (Pb-dominant) trend from the CSA mine. A further 43 RC holes were drilled into Spotted Leopard (a southern prospect in CML5 along strike of mine) in 1990-91.

 

There are also records for some 255 surface exploration diamond drill holes within CML5 totalling around 150,960m for an average hole depth of 592m. These include historical (pre-Glencore) holes up to the current diamond drill program that is ongoing as of 2024.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 46

 

 

 

Figure 8HISTORICAL EXPLORATION DRILLING - LONG SECTION
BDA - 0230-04-April 2024Behre Dolbear Australia Pty Ltd

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 47

 

 

 

Figure 9SURFACE EXPLORATION DRILL COLLAR LOCATIONS
BDA - 0230-04-April 2024Behre Dolbear Australia Pty Ltd

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 48

 

 

Diamond drill holes have been drilled on a range of prospects including Western Gossan and Block 19 (west of mine), GSM/Kendi (north of mine), Pink Panther and Spotted Leopard (south of mine) as well as targeting extensions to the QTS North, South and Central mine systems. In 2023 diamond drilling tested the CSA-trend at Kendi (3 km north of mine; 1 hole) and Midnight (6 km south of mine; 2 holes) prospects. In 2023 and continuing into 2024 diamond drilling tested the Stoney Tank prospect (4 km ESE of mine; 2 holes), and prospects along the Tailings Dam Shear (3 km east of mine) including Ringneck and Falcon prospects (2023; 5 holes) and Cherry and Tailings Dam prospects (ongoing in 2024; 5 holes).

 

As the Mineral Resources and Mineral Reserves presented in this report lie within CML5, exploration activities on the remaining exploration tenements are largely excluded from this Report.

 

Historical Drilling Campaigns 2000 – 2016

 

Surface diamond holes drilled within CML5 from 2000-2016 include:

 

2003 – 2 holes at Tailings Dam

 

2004 – 2 holes into the QTS System

 

2005 – 1 hole near mine northeast, 7 holes at Tailings Dam

 

2006 – 3 holes testing the QTS System, 3 holes at Tailings Dam

 

2007 – 1 hole near mine northeast, 1 hole at Pink Panther and 1hole at Tailings Dam

 

2008 – 1 hole testing 1993 holes at GSM anomaly, 1 hole near mine south

 

2009 – no holes identified as being drilled this year

 

2010 – 2 holes in Western Gossan

 

2011 – 2 holes testing mineralization in CM30 at Western Gossan, 1 hole near mine south, 1 hole at Pink Panther

 

2012 – 1 hole near mine south

 

2015 – 3 holes at Pink Panther

 

2016 – some 7,500m at Pink Panther.

 

Surface exploration diamond drilling during this period was relatively minimal until copper intersections and DHEM anomalies at Pink Panther resulted in increased drilling in 2016.

 

2017 – 2020 Near-Mine Reverse Circulation Drilling

 

A substantial amount of the total near-mine RC drilling occurred in the 2017 to 2018 period, with some additional holes in 2019 and 2020.

 

A small subset of RC drilling, including 17 holes in 2010, 6 holes in 2018 and 1 hole in 2020, have been drilled for the purpose of establishing water bores. A further nine holes were drilled in 2023 to the south and east of the tailings dam. The water bore holes are also sampled and assayed.

 

Over the course of 2017 to 2018 a significant number of holes were drilled including:

 

65 at Kendi (along strike of QTS North)

 

62 at Spotted Leopard

 

58 at Pink Panther (south of QTS South)

 

32 at QTS North

 

18 at QTS South

 

12 at Western Gossan.

 

In 2019, a further 17 holes were drilled at QTS South and 8 holes were drilled at QTS Central in 2020.

 

In general, the multi-element geochemistry from the RC drilling confirmed the strength of the geochemical anomaly along the eastern side of the mine corresponding to QTS-style (chalcopyrite) mineralization. These results provide additional support for the plan to progress further exploration diamond drilling on the eastern side of the known QTS North lenses.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 49

 

 

2017 – 2020 Diamond Drilling Campaigns

 

Interest in Pink Panther and QTS South continued with some 11,091m of diamond drilling in 2017.

 

In 2018, a total of 24,107m of diamond drilling tested mineralization at QTS South, QTS North, Kendi, Spotted Leopard and Western Gossan.

 

In 2019 some diamond drilling was undertaken at QTS North, however the major emphasis of the 2019 programme was the delineation of Inferred resources at QTS South (discussed below).

 

2022 – 2023 Diamond Drilling Campaign

 

The 2022 campaign, consisting of 11 holes, was based on modelling from the 2015 DHEM surveys of previous drill holes and targeted the QTS North, QTS South and Western Gossan areas. Five holes at Western Gossan drilled between August and November 2022, successfully intersected modelled DHEM conductor plates and two zones of pyrite-sphalerite-galena mineralization. Four holes at the QN prospect (potential lens east of QTS North) intersected the modelled DHEM conductor plates and assays confirmed mineralization in all holes with a best intercept of 4.3 m at 3.30% Cu and 12.10 g/t Ag from 596.6 m in QNDD009.

 

Western Gossan lies immediately west of the historical Western System. DHEM data from holes CM50 (drilled in 1993 under Golden Shamrock Mines ownership) and SRDD11002 (drilled in 2011) produced two strong conductors that aligned with significant mineralization in some historical drill holes (circa 1958).

 

As above, five holes drilled in 2022 (3,771m) at Western Gossan intersected two zones of massive sulphide mineralization with significant sphalerite and lesser galena and chalcopyrite. The zones matched the modelled conductors; DHEM and assay results are confirmed significant Zn-Pb-Ag mineralization.

 

The QTS North and South drill targets were based on DHEM data from holes drilled in 2018-19. Two modelled conductors aligned with mineralization in nearby holes. As of 24th February 2023, four holes had been completed and intersected chalcopyrite mineralization within Fe-chlorite alteration within the modelled conductors.

 

At QTS South modelling from DHEM surveying in 2020 on some 19 DDHs indicated three potential conductors. One hole was drilled from February to April 2023 but failed to intersect the modelled conductor plate and did not intersect significant mineralization.

 

The 2023 campaign, consisting of 9 holes, was targeted the strongest auger-soil Cu anomalies at the Stoney Tank (2 holes), Falcon (3 holes), Ringneck (2 holes) and Midnight (2 holes) prospects. All holes intersected alteration and minor mineralization with STDD23001 producing the best intercept of 0.75 m at 7.8 % Cu and 35.9 g/t Ag from a down hole depth of 476.7 m.

 

A tenth hole was drilled into a late channel FLEM anomaly on the western margin of the Kendi prospect but did not intersect alteration or mineralization.

 

In 2024 five diamond drill holes are progressing at the Tailings Dam prospect (historical off hole conductor and along strike of a historical Cu intercept) and Cherry prospect (geochemical target). Additional holes are planned to test late channel FLEM anomalies south of the mine at the Outer Reef prospect and at the QTS South and QTS Central systems at the CSA Mine.

 

7.4Underground Drilling

 

Underground drilling is directed at extending and defining mineralization below the current working levels in order to define reserves ahead of mining (Figure 10). During the year some holes may be drilled for purely exploration purposes and some of the resource definition holes may be extended to test a nearby exploration mineralization. The aim of these drilling programs is to replace, as a minimum, the Reserve material extracted each year.

 

As shown in Figure 11, in conjunction with continuous copper production over the past 10 years, CSA has successfully maintained replenishment of Mineral Resources each year. Under MAC ownership, in addition to the resource replenishment through exploration, CSA has seen a significant increase in Mineral Resources between 2022 and 2023. This increase has primarily been driven by improved consistency in resource categorization, inclusion of lower grade mineralization (above 1.5% Cu) by a modernised approach to orebody and ongoing incorporation of face and back mapping data. Additional detail on the Mineral Resource Estimate is outlined in Section 11.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 50

 

 

 

Figure 10LONG SECTION - CSA MINERALISATION
BDA - 0230-04-April 2024Behre Dolbear Australia Pty Ltd

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 51

 

 

 

 

Figure 11HISTORICAL RESOURCES vs PRODUCTION
BDA - 0230-04-April 2024Behre Dolbear Australia Pty Ltd

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 52

 

 

In addition to resource and exploration drilling as described above, drilling is also completed for geotechnical purposes ahead of mine infrastructure programs (e.g. vent rises) and for other mine infrastructure such as paste fill, electrical and water supply. All holes are geologically logged and sampled as required. Selected holes are geotechnically logged as coverage requires.

 

At the end of 2023 there were approximately 2,932 diamond holes and 71,000 samples contributing to the CSA Mineral Resource with hole information dating as far back as 1950.

 

7.5Geotechnical Data

 

Geotechnical core logging of RQD and Q Prime parameters is undertaken for all drilling and has been collected for over 20 years; this together with the detailed geology mapping completed on all development levels forms an excellent basis for assessing the ground conditions at the mine.

 

All CSA diamond drill core is comprehensively logged including the recording of:

 

·geology, mineralization and alteration

 

·core recovery

 

·RQD.

 

In addition, drill core logged specifically for geotechnical assessment is logged for:

 

·rock strength

 

·number of joint sets or fractures including:

 

-type of structure

 

-roughness

 

-shape

 

-infill minerals

 

-alpha and beta angles (if core has been oriented)

 

·orientation quality (if core has been oriented).

 

This geotechnical information is stored in the drillhole database. All core is photographed before being cut for sampling.

 

Underground development mapping (face and backs) is undertaken to delineate lithology, mineralization, alteration, significant structures and geotechnical features of significance. The underground mapping allows for the preparation of detailed geological/geotechnical level plans, that are available for geotechnical analysis and stope planning.

 

The quantity and quality of the geological and geotechnical information collected is sufficient to describe the physical characteristics of the rock mass and major structures, and to classify the rock mass using industry standards for sublevel open stoping mines.

 

7.6Hydrological Data

 

The CSA mine is a dry mine with little water inflow other than that introduced by mine fill and service water. No hydrological drilling or ground water monitoring is required other than recording the pumped volumes from the mine dewatering system.

 

7.7Qualified Person’s Opinion on Exploration Interpretations

 

The QPs consider the drilling and exploration programmes completed at CSA to be appropriate for near-mine exploration and resource replacement. In-fill drilling is undertaken at an appropriate rate to allow the steady conversion of resources to reserves as required and to provide the necessary information for detailed mine planning.

 

Geotechnical parameters are collected in conjunction with underground diamond drilling and geotechnical data is captured within the drill database for consideration during the estimation of Mineral Reserves and Mineral Resources and in the detailed design of underground stopes and development. CSA maintains an extensive database of geotechnical data, has a solid understanding of the geotechnical characteristics of the mine and undertakes continuous improvement activities on a regular basis.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 53

 

 

8Sample preparation, analySes and security

 

8.1Assay Sample Preparation and Analysis

 

Core processing follows the standard sequence of meter mark-up, quantification of recovery, RQD determination, geological logging, sample mark-up, core photography, bulk density determination and sampling.

 

The sampling procedure includes interval checks, cutting intervals, sampling intervals, inserting standards, sampling duplicates, weighing samples and dispatching samples. All parts of the core processing cycle are tracked and recorded electronically.

 

Core yard technicians review the core and check the sample intervals as identified on the sampling sheet, including checking to ensure that the sample intervals satisfy length requirements (0.4 – 1.1m for NQ core). The geologist corrects any errors or discrepancies.

 

Core is cut according to the core cutting procedure with a CoreWise diamond core saw.

 

Once the entire hole is cut, trays are laid out in order on the racks or on pallets. Sample intervals are marked onto the tray before sampling, allowing the correct sample intervals to be written onto the remaining half core. The core is cut in half with one half submitted to the laboratory for analysis and the other half returned to the tray. The half core to be analysed is sampled into pre-numbered calico bags with sample numbers from the bags written on the sample sheet before sampling. Sticks of half core longer than approximately 8cm are broken in order to reduce the risk of sample bags tearing during transport.

 

Sample preparation and assaying is carried out by independent laboratory, Australian Laboratory Services (ALS) in Orange, NSW, using an aqua regia digest and the Inductively Coupled Plasma Atomic Emission Spectrometry (ICP-AES) analytical method, with analysis for a standard suite of elements including copper, zinc, lead, and silver. Comprehensive Quality Assurance/Quality Control (QA/QC) protocols have been in place since 2004 and include insertion of standards (supplied by Ore Research and Exploration Pty Limited), blanks and duplicate samples at a frequency of approximately 1 in 30 samples. CSA monitors the QA/QC data reports; the sampling and assaying data for the main elements are considered reliable and without material bias and sample security arrangements are appropriate and satisfactory. CSA’s relational drillhole database is an AcQuire database which is a site-managed system.

 

By the beginning of 2023, due primarily to Covid-19 impacts on CSA geological and core sampling staff during 2020-2022, a backlog of over 13,000 m of un-logged and/or un-assayed drill core was developed. Over the course of 2023, CSA increased resourcing in this area in an effort to reduce the backlog which is now sitting below 2000m as of February 2024. Due to scheduling requirements, lockdown of the drill database for resource estimation occurred in August and therefore most of the results from this backlog reduction will be captured in subsequent Mineral Resource estimates.

 

8.2Bulk Density Determinations

 

CSA has compiled a database of around 16,000 bulk density values by testing one sample from each core tray (approximately one sample per 6.5m of core) and determining density using the water immersion method. A regression formula based on the copper assay of the samples tested has been derived from this data. Since 2017, CSA has used ALS to carry out density measurements; CSA advises that the ALS data aligns well with the site-developed regression formula.

 

8.3Quality Assurance and Quality Control

 

Regular analysis of CSA mine standards, inserted with each batch sent to the laboratory, commenced in 2007. These are in addition to normal laboratory standards inserted in the process by ALS. All QA/QC data are stored in the CSA acQuire database.

 

Sample weights are measured both before the samples leave CSA Mine site, and before the samples are prepared for analysis at the ALS laboratory.

 

Standards and Blanks

 

External standards and blanks are inserted into the sampling sequence for each drill hole assay submission. One blank and eleven standards derived from CSA mineralization were prepared, supplied and certified by Ore Research and Exploration Pty Ltd for use at CSA.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 54

 

 

Standards to be inserted are specified by the logging geologist on the sampling sheet. The procedure requires a minimum of one standard for every 30 samples, with the selected standard representing a copper grade similar to the estimated copper grade in the surrounding samples. The core yard technician removes the label from the standard so that it cannot be identified by the laboratory. It is placed in the appropriately numbered sample bag and secured. Blanks are inserted periodically, principally following high grade samples to check for contamination in the laboratory processing stream.

 

Field Duplicates

 

Duplicate intervals are specified by the geologist on the sampling sheet and are collected approximately every 30 samples. Duplicate samples are also inserted at the end of the hole. The core yard technician removes the remaining half of the core from the selected interval and places it in the appropriately numbered sample bag. For those intervals with duplicate samples, no core remains in the tray.

 

A separate dispatch is completed for each drill hole.

 

Comparison of original and duplicate (second half of drill core) assay results for the period 2002 to 2021 indicate good performance for copper, with a correlation coefficient of 0.98. Silver field duplicates are more variable than copper with a correlation coefficient of 0.79.

 

Laboratory QA/QC

 

ALS inserts standards into the sample stream as part of its internal QA/QC procedure. Assay results for these standards are supplied with results for the samples submitted for analysis. Assay results for laboratory standards are also stored in the acQuire database. Again, laboratory standards are checked on receipt and incorporated in the QA/QC reports generated within the acQuire database and any issues are reported immediately to the laboratory for resolution.

 

8.4Security and Storage

 

Geological records and assay data are stored in an acQuire database. Drill hole information is stored as collar, down hole survey, assay, geology, specific gravity and geotechnical data.

 

Drill hole location data are entered manually, survey and assay data are uploaded from the survey tool and laboratory downloads respectively. Geology data is entered manually from paper logs or logged directly into acQuire via a laptop computer. A significant proportion of drill data in the database is derived from historic hardcopy drill logs.

 

All data entered is tracked via various registers, including Diamond Drill Hole Register, Diamond Drilling Spreadsheet, Core Processing Checklist and UG Sampling Register.

 

There are four levels of access to the database. ‘Read only’ access is permitted for “public” users, ‘restricted data entry’ access for “data entry” users and ‘write access’ to data tables for “acQuire user” users. This hierarchical security structure allows only the database manager full access to the data.

 

8.5Qualified Person’s Opinion on Sample Preparation, Security and Analytical Procedures

 

Cube has undertaken a review of historic (2020 and 2021) and recent (2022 and 2023) CMPL reports detailing the sample preparation, analysis and security. Cube is satisfied that the current practices undertaken by CMPL are to industry standard and provide assay data which are sufficient to support the estimation of a Mineral Resource.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 55

 

 

9Data Verification

 

9.1Internal Data Verification

 

Basic database validation checks are carried out by CMPL personnel. These include sample from and to depths, geology depths, record duplication and missing collar duplication checks, as well as collar survey and down hole survey checks. Assay certificates are verified against acQuire dispatch and laboratory job numbers. Extensive random checks of the digital database are made against hardcopy/pdf format assay certificates and geology logs.

 

Core recovery data has only been collected consistently at CSA since 2004. Data from 2004 shows an average core recovery greater than 95%. Poor core recoveries are not considered to have a significant impact on the CSA resource.

 

9.2Review of CMPL’s QA/QC

 

Cube has undertaken a desktop review of historic (2020 and 2021) and recent (2022 and 2023) CMPL Mineral Resource reports containing control charts detailing the results of the CSA mine QA/QC. The process of systematic QA/QC monitoring has been in place since 2007. Cube’s review of standards and laboratory and field duplicate results has identified no material issues, indicating the assay data used by CMPL is without material bias due to laboratory processes and that results are repeatable with an appropriate level of precision and accuracy. Cube is satisfied that the current practices undertaken by CMPL are to industry standard and provide assay data which are sufficient to support the estimation of a Mineral Resource.

 

9.3Geological and Operation Reconciliation

 

Confidence in the geological interpretation and estimation at CSA is supported by a history of reconciliation of mined tonnage and grade compared with the stope tonnes and grade depleted, the latter being based on the resource and reserve estimates. CSA tracks the stope grades for the Undiluted Stope Design (resource grade), the Diluted Stope Design (the reserve grade) and the actual mined grades as reconciled to the mill. CSA uses a Cavity Monitoring System to obtain the final volume (tonnes) of each mined stope. The ore mined tonnes and grade are reconciled against the reported ore milled tonnes and grade, allowing for opening and closing stockpile figures.

 

Historically, CSA’s stope reconciliation reports show reasonably good agreement between the Reconciled Ore Mined figures and the Diluted Stope Design (reserve) figures. Over a ten-year period to December 2023, the annual stope production reconciliations showed tonnage reconciliations averaging 101%, copper grade reconciliation averaging 102% and copper metal reconciliation averaging 103%. Reconciliation data for the last five years covering the period 2019-2023 is shown in Table 9.1 and indicates a reconciliation of 98% for tonnes, 98% for grade and 95% for contained copper metal.

 

The high-grade nature of the deposit means that any ore losses or excess dilution can have a meaningful impact on ore tonnes and grade. The higher dilution seen in recent years, where level spacing was temporarily increased, appears to have had a negative impact on reconciliation.

 

Table 9.1

 

CSA Stope Reconciliation - Ore Mined vs Reserve – 2019 to 2023

 

     Tonnage   Grade   Contained Copper 
Year  Category   Mt   % Cu   kt 
2019   Reserve Depleted     0.844    4.34    36.8 
    Ore Mined (Mill Reconciled)    0.911    4.18    38.1 
    Mined vs Reserve    108%   96%   104%
2020   Reserve Depleted     1.108    4.06    45.0 
    Ore Mined (Mill Reconciled)    1.067    3.86    41.1 
    Mined vs Reserve    96%   95%   91%
2021   Reserve Depleted     0.816    3.94    32.2 
    Ore Mined (Mill Reconciled)    0.695    3.97    27.6 
    Mined vs Reserve    85%   101%   86%
2022   Reserve Depleted    0.576    3.69    21.2 
    Ore Mined (Mill Reconciled)    0.538    3.44    18.5 
    Mined vs Reserve    93%   93%   87%
2023   Reserve Depleted    0.351    3.2%   11.2 
    Ore Mined (Mill Reconciled)    0.293    3.4%   10.0 
    Mined vs Reserve    84%   107%   89%
Overall        98%   98%   95%

 

9.4Qualified Person’s Opinion on Data Adequacy

 

The QP is satisfied that the data on which the Mineral Resource has been based are of sufficient quality to support the estimation of a Mineral Resource.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 56

 

 

10Mineral Processing and Metallurgical Testing

 

With 56-years of operating history (23-years under Glencore ownership), the CSA orebody mineralogy is well understood with the operating performance of the processing plant consistently achieving metallurgical recoveries in the order of 97-98% to produce a high-quality 26-27% Cu concentrate.

 

An overview of the standard metallurgical management activities performed during CSA operations along with a selection of historical metallurgical studies are summarized in the following sections. Some of these studies were investigative in nature and may not have resulted in significant modifications or adjustments to the processing facility.

 

10.1Overview of Metallurgical Testing Practices

 

Being an operating mine, particularly one with such extensive operating history, CSA has established standard operating procedures for metallurgical management of the processing facility.

 

The operation employs dedicated metallurgical staff and conducts regular operational test practices using a combination of onsite and offsite laboratory testing.

 

The most comprehensive test regime employed by the metallurgical team on a regular basis is the Flotation Plant Survey which takes multiple samples from across all key process streams throughout the plant to establish a detailed mass balance and provide input into ongoing data analysis. The following outlines the key procedures employed in the survey:

 

·Sample collection follows the internally developed Safe Work Instruction - Flotation Survey Procedure, updated in November 2022, which is based on sample techniques reported in Wills’ Mineral Processing Technology book from JKMRC Australia 7th Edition

 

·Metallurgical samples from across 22 locations within the processing streams are taken in various set intervals and conducted in accordance with sample capture procedures

 

·Standard onsite sampling and testing includes flotation, settling tests, On-stream Analyzer (“OSA”) calibration samples, PSI flotation feed, Specific Gravity (SG) testing and moisture analysis

 

·X-ray fluorescence (“XRF”) analysis is conducted in the onsite laboratory to establish initial results used for short-term operational decisions and internal reporting

 

·A selection of samples is then sent offsite to independent ALS Ltd. laboratory Service for assay using Inductively Coupled Plasma Atomic Emission Spectroscopy (ICP-AES), an analytical method used to detect and measure elements to analyze chemical samples

 

·Samples requiring comminution analysis are typically sent to JKTech Pty Ltd. (“JKTech” or “JK”) laboratories at the University of Queensland

 

·Results received from onsite and offsite laboratories are then incorporate into a detailed data analysis and regression modelling process outlined in Section 10.2.

 

·Site samples for analysis are kept and stored in the onsite laboratory

 

·Offsite laboratory results are compared with onsite laboratory results to allow the metallurgical team to calibrate internal metallurgical models, onsite laboratory equipment and plant equipment

 

·Results are regularly validated through repeat sampling, and statistical analysis; activities commonly requiring validated results include those required for adjustments of SG gauges of the flotation feed and concentrate thickener; in such cases, four samples are taken from each sample point to establish the average and standard deviation of the results.

 

10.2Data Analysis and Regression Modelling

 

Testing procedures and results are supported by statistical analysis such as regression models, reproducibility tests, and variability mapping. During individual operational trials, test work is usually supported by statistical experimental design (t-tests) using the statistic computer package Minitab.

 

An End of Month Metal Reconciliation is based on a Matrix-mass balance approach, which involves data from several sources including:

 

·offsite ALS Laboratory assay results

 

·onsite laboratory XRF

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 57

 

 

·site and port stockpile information from Alfred H Knight (independent laboratory service), Qube Logistics (port operator), and Aurizon (rail operator)

 

·internal mining data.

 

The mass balance is established to identify actual from reconciled residuals through the adjustment of standard deviations and Monte Carlo simulations. If the mass balance identifies discrepancies, data and instrumentation are reviewed in detail for readjustments.

 

Key analysis within the mass balance process includes assays of feed, concentrate and tailings streams. Composite samples are sent to ALS and for XRF in-house analysis.

 

10.3Planning and Forecasting

 

The Weekly, Monthly and Quarterly plans used in CSA’s operations employ in-house calculated regression models to establish appropriate assumptions and forecasts. The regression model incorporates geometallurgical results, elemental to mineral conversion calculations, back-calculations, and mining figures (haulage and stope grades).

 

Two main components of the processing forecasts and their associated drivers are:

 

·Grinding Forecast

 

-Mill Power Assessment - based on the Mine Future Ores Program conducted in 2020 by JKTech and based on comminution models reported by Napier Munn 1999, Mineral Comminution Circuits

 

-Modified Throughput Model - employs power parameters based on regression models and SAG and ball mill powers and parameters.

 

·Flotation Forecast

 

-Recovery and Concentrate Grade - regression models developed from geometallurgy, mineralogy and flotation testwork database

 

-Tailings Grade Prediction - back-calculated from the calculated feed grade, milled tonnes, and copper metal tonnes

 

-Anticipated Feed Grade - calculated from the mining figures, haulage tonnage and stope copper grades.

 

As shown in Table 5.1, CSA has maintained excellent consistency in copper and silver recovery, due largely to the continual improvement on internal geometallurgical models. As CSA continues to develop existing orebodies at depth, extend existing orebodies laterally, discover new orebodies and, potentially, treat third-party ore sources, the metallurgical team will continue to undertake testwork and improve the accuracy of these models.

 

10.4Deleterious Elements

 

The influence of deleterious elements on CSA’s operations is low, however regular testing and analysis is performed to ensure any elevated levels are managed effectively. Close attention is given to stopes containing relatively high amounts of iron, zinc and lead (which may vary from 0.01 to 0.6%). Any elevated levels are immediately communicated to mine geologists. Laboratory batch flotation selectivity, and mineral liberation test work on future mineralization are conducted to prepare planning inputs and minimise any influence on product grades.

 

10.5Test Laboratories

 

CSA maintains an onsite laboratory which is capable of conducting flotation tests, settling tests, On-stream Analyzer (OSA) calibration samples, flotation feed slurry testing, SG testing and moisture tests.

 

Offsite laboratories are used for independent validation and test work. ALS Laboratory Services in Orange, NSW and JK Tech at the University of Queensland are the offsite laboratories commonly used.

 

ALS Ltd. is a global company headquartered in Brisbane, Australia, which provides testing, inspection, certification, and verification services out of over 370 sites across 65 countries. With 18,000 staff, ALS operates throughout Australia, Asia, the Pacific, North America and South America, Europe, and Africa. ALS is ISO17025 and ISO9001 certified.

 

JKTech offers consultancy and laboratory services, specialist software and equipment, and professional development courses to mining companies, particularly centred around comminution, flotation and hydrocyclone and metallurgical assessment. JKTech is a subsidiary of the University of Queensland.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 58

 

 

10.6Mine Metallurgical Test Work on Future Orebodies Study – JKTech 2020

 

JKTech was engaged to conduct metallurgical testing and a geometallurgical study program as part of continuous improvement practices at CSA. The objective of the study was to improve the forecasting of throughput, copper concentrate grade and concentrate recovery for QTSN and QTSC orebodies. The test program included 44 samples in total, consisting of 39 geometallurgical and 5 characterisation samples taken from a carefully selected array of drill hole samples.

 

Table 10.1 outlines the tests performed and the intended purpose of each test.

 

Table 10.1

 

2020 Future Orebody Metallurgical Testing Programme (JK Tech)

 

Test Purpose
   
Equotip Equotip hardness measurements can be used as a comparative hardness ranking tool to identify domains of similar hardness in large rock volume.  Determines if comminution hardness can be predicted using Lieb hardness measurements
JK Rotary Breakage Test Allows rapid testing of particle breakage under energy single point contact and low energy repetitive impact conditions.  Provides indicative Axb for SAG mill assessment
SMC Used to predict comminution circuit throughput as well as rock mass characteristics and blasting properties.  Provides a cost-effective means of profiling an orebody.  Provide scale-up of the JK Rock Breakage Test Lite
Bond Ball Mill Work Index A standard test for determining the ‘Bond Ball Mill Work Index’ (grinding power requirement) of a sample of ore by measuring the resistance of the material to crushing and grinding.  Provides input to ball mill design and optimization
Point Load Index Test (PLT) Used to simultaneously characterize rock for blastability and comminution processes.  Determines if comminution hardness can be predicted using PLT measurements
Mineralogy and Assay Undertaken by a Mineral Liberation Analyzer (MLA) particle mineral analysis.   Used to identify mineral composition, deleterious elements, grain size, extent of liberation, particle size distributions and maximum flotation recoveries.  QEMSCAN measurements taken, supported by Chemical assay (ME-OG62 four acid digest method).  Determines modal mineralogy which can affect hardness – proxy input

 

On completion of the study, key internal geometallurgical, mass balance, grinding and processing regression models were updated to improve the statistical accuracy of predictions.

 

10.7Comminution

 

Design and range values for CSA’s primary comminution properties are outlined in Table 10.2. These values have been established through various testing campaigns conducted by CSA over the past 56 years of operation.

 

Table 10.2

 

Comminution Properties

 

Comminution Properties  Unit  Value
Abrasion Index Range     0.03 – 0.24
Abrasion Index Design     0.09
Bond Impact Crushing Work Index – Design  kWh/t  19.0
SMC Drop Weight Index – Range  kWh/m3  2.35 – 7.28
SMC Drop Weight Index – Design  kWh/m³  4.77
Bond Rod Mill Work Index – Range  kWh/t  11.0 – 22.1
Bond Rod Mill Work Index – Design  kWh/t  16.7
Bond Ball Mill Work Index – Range  kWh/t  7.8 – 17.0
Bond Ball Mill Work Index – Design  kWh/t  15.3
Axb Range     27 – 97
Axb Design     40.3

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 59

 

 

10.8Recovery and Concentrate Estimates

 

Design and range values for CSA’s primary recovery properties are outlined in Table 10.3.

 

Table 10.3

 

Copper Flotation Results

 

Cu Flotation Concentrate  Units   Result 
Cu Concentrate Grade (range)   %    24.0 – 29.0 
Cu Concentrate Grade (design)   %    26.5 
Cu Recovery (design)   %    98.0 
Cu Recovery (for resource and reserve estimation)   %    97.5 

 

10.9Qualified Person’s Opinion on Mineral Processing and Metallurgical Testing

 

Over the long operating history of the CSA mine, the QP is satisfied that the many metallurgical testwork programmes undertaken have been comprehensive and extensive. Section 10 provides a snapshot of some of this work. The mineralogical and metallurgical understanding developed from this testwork has resulted in the superior metallurgical recoveries and concentrate quality being consistently achieved from the process plant.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 60

 

 

11Mineral Resource Estimate

 

This section contains forward-looking information related to tonnage and grade for the project. The material factors that could cause actual results to differ materially from the conclusions, estimates, designs, forecasts or projections in the forward-looking information include any significant differences from one or more of the material factors or assumptions that are set forth in this sub-section including actual in-situ characteristics that are different from the samples collected and tested to date, and equipment and operational performance that yield different results from current test work results.

 

11.1Introduction

 

As CSA is located in Australia and was previously owned and operated by GIAG, the Mineral Resource estimate (“MRE”) was historically reported in accordance with JORC 2012 guidelines. The Company reported CSA’s initial SK1300-compliant Mineral Resource and Mineral Reserve estimates as at 31 December 2022, in its 2023 Technical Report Summary filing. The CSA Mineral Resource estimate is updated annually and consists of Measured, Indicated and Inferred (“MII”) resources and was historically reported as at December of each year. In late 2023, the Company elected to change the reporting date of all future MREs to August 31st. The August 2023 CMPL Mineral Resource estimate was undertaken using all available drilling, geological and assay data as at 31 August 2023 and depleted with strings and wireframes (Void Model) as at 31 August 2023.

 

Resource estimation at CSA is based on long-standing procedures, mostly dating from the mid-2000s, which have been incrementally improved over the years. A Void Model is developed using the actual stope voids mined plus an estimate of the stopes to be mined to the relevant cut-off date. The voids are deducted from the resource model to obtain an estimate of the remaining in-situ resource. The new MRE is used by the mining and technical services departments for mine planning for the following year and is used by the company for the MRE statement.

 

CMPL defines resource wireframes for each mineralized lens in the five systems – QTSN, QTSC, QTSS, Eastern and Western. Interpretation of the wireframes is based on geological mapping in the mine, drill core logging, and the structural model that has been developed over time. The wireframe contacts are interpolated between developed levels and then extrapolated beyond mine development at 5m section increments using drill hole data, core photography and assay data. CMPL uses a threshold value of 2.5% Cu from the assay database to guide the interpretation of the high-grade lenses. For August 2023, new lower grade domains were introduced as a result of the reduced offsite costs – these domains use a 1.5% Cu cut off and form a lower grade halo around the high-grade lenses. An outer mineralization envelope is defined for each model using the regional S1 shear interpretations as boundaries.

 

Separate block models are established for each of the five systems. The parent block size of 5mE x 5mN x 10mRL is used for all models. Assay data is composited to 1m; no grade cuts are applied to the copper data and only a few composite values are capped for silver. Variography is carried out for each mineralized lens if there is sufficient data available. Grade estimation for copper and silver is carried out using Ordinary Kriging (“OK”) in three passes with the first pass search ellipse based on the variogram range; the search ellipse dimensions are doubled for the second pass and quadrupled for the third pass. Interpreted wireframe boundaries are treated as hard boundaries for grade estimation. The density regression formula is applied using the estimated block copper grade to determine the block bulk density value.

 

Resource categorisation of Measured, Indicated and Inferred is initially assigned to the blocks informed in Pass 1, 2 and 3 respectively. This initial categorisation is manually modified based primarily on the drilling density. In general, areas with average drill hole spacing of 20 x 37.5m or less in QTSN and 20m x 20m for QTSC, QTSS, Eastern and Western, are categorised as Measured resources, with 40 x 70m or less as Indicated resources in QTSN and 40m x 40m in the other four systems. Inferred resources are categorised in areas with a spacing exceeding that of the upper limits on Indicated resources. CMPL separates Pass 3 blocks into Inferred resources and a fourth category ‘Unclassified’ for areas of low confidence with sparse drilling; the Unclassified material is not included in the reported MRE.

 

11.2Available Data

 

In all, more than 71,000 samples from more than 2,900 diamond holes contribute to the CSA Mineral Resource. This drilling ranges from as far back as 1950 to the present; however, the bulk of the drilling contributing to the estimation has been completed since 2000. The diamond holes for estimation prior to 2000 are located predominantly in the upper levels and represent 51% of the drill data; diamond drilling post 2000 has been focussed primarily on the lower levels and represent approximately 49% of the drill data. The average drillhole length (surface and underground) is approximately 160m with the maximum over 1,100m. In general, drill spacing increases with distance from development with nominal 20m north-south by 20m vertical spacing for 2 to 4 levels ahead of the mining front, expanding to 40m by 40m and greater below this. For QTS North, the bulk of drilling prior to 2017 was at the above described spacing, but during 2017, following an external analysis of the drill spacing, this was increased to 20m north-south by 37.5m vertical.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 61

 

 

Diamond holes are planned using a standard procedure. Core sizes vary, however the bulk of drilling used for the current resource comprises NQ2 and NQ3 core sizes, with lesser contributions from HQ, NQ, BQ, LTK48 and LTK60. Hole collars are marked up by the mine surveyors and checked again by the mine surveyors on completion of drilling.

 

The database currently includes some underground drill collars without verifiable collar survey pickups. Of these and since 2000, 392 are relevant to the current CSA Mineral Resource, with 235 relating to QTS North, 77 to Western, 44 to Eastern, 35 to QTS South and one to QTS Central. These drill collar locations are based on planned coordinates.

 

A review of lens shape and the resource model revealed no obvious distortion that could be attributed to incorrect location of drill intersections. Based on this, it is considered unlikely that actual drill collar locations vary significantly from the planned locations.

 

The remaining unsurveyed holes in QTS North, QTS South, QTS Central, Eastern and Western have sufficient support from surveyed collars from the same drill pads, and a high enough density of adjacent drill holes with surveyed collars to be confident in their use in the resource models.

 

As a minimum standard, down hole directional surveys are carried out at 15m, 30m and every 30m following. Extra downhole surveys are conducted as deemed necessary. The azimuth of the 15m survey is at times affected by the proximity of the drill rig or ferrous ground support and therefore is monitored closely. Surveys that show significant deviation are checked and, if considered erroneous, are removed from the database. Since late 2016, multishot surveys, with surveys taken every 3m, are taken on completion of each hole.

 

11.3Geological Models

 

Mineralization at CSA is largely controlled by major shears, and consists principally of massive, semi- massive, and vein sulphides, with the dominant sulphide being chalcopyrite. Mineralization away from the lenses is narrow and discontinuous, occurring mainly in minor shears within barren altered sediments. Mapping and core logging are the main sources of information, and greatly assist in interpretation of mineralization.

 

Interpretation of lenses at CSA is based on geological mapping and diamond drilling data. Mineralized boundaries are digitised from geological maps and the resulting strings are allocated to the appropriate RLs. These boundaries are then interpolated between developed levels and extrapolated beyond development at 5m intervals and adjusted using diamond drill hole records, core photography and assay data. Boundary strings are aligned to drill hole lithology/grade boundaries to ensure location accuracy. When the complete set of bounding strings for an individual lens has been generated and checked, the strings are linked to produce a solid lens wireframe.

 

High-grade lens interpretations are completed using a threshold value of 2.5% Cu, maximum internal downhole waste of 3m and a minimum lens width of 3m. For August 2023, a lower grade halo domain has been constructed around the high-grade lenses. The lower grade halo is defined by Categorical Indicator Kriging (“CIK”) at a threshold of 1.5% Cu, using an indicator probability value of 0.4.

 

No external dilution is added as lens block model margins are constrained by the geological interpretation while overall models are constrained by regional shears.

 

11.4Mineralized Domain Coding

 

CMPL applies a systematic domain code to each lens wireframed within the five shear systems. The CSA shear systems are Western, Eastern, QTS South, QTS Central and QTS North. The domain codes (ROCKZONE) consist of three-digit codes for mineralized domains and two-digit codes for low grade/waste domains as presented in Table 11.1.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 62

 

 

Table 11.1

 

ROCKZONE CODES

 

Mine Area ROCKZONE
Western – Low grade/waste 80 / 10
Western – Mineralized 100, 101,110,120,121,130, 140, 150, 160, 170, 180, 190,200
Eastern – Low grade/waste 80 / 30
Eastern – Mineralized 700, 710, 720.to.810
QTS South – Low grade/waste 80 / 70
QTS South – Mineralized 600, 610, 620, 650, 670, 680
QTS Central – Low grade/waste 80 / 40, 50, 60
QTS Central – Mineralized 850, 860, 870, 880, 890, 900, 910, 920
QTS North – Low grade/waste 80 / 20
QTS North – Mineralized 300, 310, 320.to.570
QTS South Upper A – Waste 85, 90
QTS South Upper A – Mineralized 950, 960

 

11.5Composites

 

Within the ROCKZONE wireframe domains the majority of sample intervals are 1m in length. CMPL has determined that there is no correlation between sample length and copper grade. Sample intervals within individual ROCKZONE wireframe domains are composited to 1m lengths for use in estimation.

 

11.6Exploration Data Analysis and Grade Capping/Outlier Restrictions

 

CMPL undertakes a statistical review of each ROCKZONE domain within the five shear systems to confirm domain characteristics and identify outlier copper and silver grades. The copper statistics presented generally confirm that the domain distributions are appropriate for a linear interpolation method such as Ordinary Kriging. Silver distributions within ROCKZONE domains are shown to be more variable than copper indicating a need for controlling the influence of outliers when using a linear interpolation method.

 

Within the copper grade populations, high grades are a feature, indicating the presence of massive copper sulphide. Their occurrence is considered by CMPL to be acceptable in terms of geological continuity and location within sulphide lodes, hence no grade capping is applied to the copper grades. While extreme outliers are noted for silver, most are considered to be acceptable within the domain population. A small number of silver grade caps have been used at QTS South and QTS Central. Grade capping replaces the original grade with a selected maximum for interpolation.

 

11.7Variography

 

Three-dimensional continuity analyses were conducted using Snowden Supervisor software. Traditional variogram models were generated by ROCKZONE for copper and silver using the 1m composite data files. The variograms models were updated for QTS North, QTS Central, Eastern and Western systems, where copper and silver variables were transformed to normal distribution (normal scores) before variogram calculation and back-transformed for estimation purposes.

 

The downhole variogram was viewed for each ROCKZONE domain to determine the nugget effect as this direction is the most informed to understand inherent variance. The nugget effect for copper and silver was generally 10% to 35% of the total variability.

 

The copper and silver variogram models are often different. This is expected given the moderate correlation between the data sets. Magnitudes and directions of the continuity ellipses match the steep plunge and sub-vertical dip of the interpreted domains. The maximum copper ranges are generally longer than the silver equivalents indicating the lower variance of the copper data.

 

11.8Block Model Definition

 

CMPL defines a three-dimensional block model for each of the five shear systems using Datamine Studio RM software. Block sub-division is not used.

 

11.9Estimation/Interpolation Methods

 

Ordinary kriged grade estimation was performed using Datamine Studio RM software. The Datamine Dynamic Anisotropy option was used for the first time in 2014 (Hosken, 2014), resulting in improved search paths proximal to lens boundaries where a curved search is more appropriate.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 63

 

 

Hard boundaries are applied using the ROCKZONE field and grade-capped composited data.

 

Copper and silver grades are estimated using a three-pass search process. The first pass search is based on an optimal search derived from Kriging Neighbourhood Analysis (“KNA”) studies completed for QTS North, QTS South, Eastern, Western and QTS Central. The first pass uses a search distance equal to, or greater than variogram maximum ranges. The second pass typically uses double the primary search range. A third pass is used to ensure each domain is fully populated with an estimated grade using a search radius that is usually four times the range of the primary search, but up to 10 times for sparsely populated domains. The same minimum and maximum number of samples is applied to the three stages, with a maximum of four samples per borehole.

 

The KNA studies determined optimal block size, sample search radii, number of samples and discretisation. Block size and discretisation parameters have been maintained for models produced since the KNA studies were completed. Search sizes are updated each year based on updated variography.

 

Block Size

 

A 5mE by 5mN by 10mRL block size is used for all mineralization systems.

 

The 2005 KNA study (Eastern System) resolved that a block configuration of 5mE by 10mN by 10mRL was appropriate but did not consider 5mE by 5mN by 10mRL block size as an option. Inspection of the block size vs kriging efficiency and regression slope plot used in 2005 reveals that there is very little change in either kriging efficiency or slope for smaller block sizes, up to the chosen configuration while both efficiency and slope begin to deteriorate immediately past the chosen configuration. Given the proximity of this deterioration to the chosen configuration, and the stability of smaller block sizes, it is considered that a configuration of 5mE by 5mN by 10mRL would be a more suitable configuration for Eastern than that chosen in 2005.

 

Discretisation

 

The 2006 KNA study determined an optimal discretisation for QTS North and QTS South of 4 by 4 by 4. Similarly, the 2005 KNA study determined an optimal discretisation grid for Eastern of 2 by 4 by 4. These values are considered still appropriate and were retained for the current estimation.

 

The Western estimation uses a 4 by 4 by 4 discretisation grid and QTS Central 3 by 3 by 3.

 

Number of Samples

 

The minimum and maximum numbers of informing samples used for the current estimation vary according to lens, with an overall minimum of 5 to 10 and overall maximum of 20 to 30. These numbers are based on the KNA studies.

 

11.10Density Assignment

 

In situ bulk density data consists of 16,000 records, collected at a frequency of one determination per core tray (~6.5m for NQ).

 

A regression equation is applied for block model density determinations. Block model in-situ density is calculated using the estimated copper grade and the regression formula presented below, for all systems except the Western System:

 

·In situ bulk density = 2.816 + 0.0406 x estimated copper grade (Cu %)

 

For the Western system, in situ bulk density is determined by:

 

·In situ bulk density = 2.780 + 0.0400 x estimated copper grade (Cu%)

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 64

 

 

 

Figure 12WIRE FRAME MODELLING MATCHING GEOLOGICAL MAPPING
BDA - 0230-04-April 2024Behre Dolbear Australia Pty Ltd

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 65

 

 

11.11Validation

 

Visual Validation

 

Block models are validated visually by comparing the input data with the block estimates. Copper grade, kriging efficiency and search pass are viewed in detail with drillhole data density to assess estimation quality. In each case, there is a good correlation between data density and estimation quality (kriging efficiency).

 

Grade versus Elevation Plots

 

Grade versus elevation plots for each lens are reviewed. Each plot shows a good correlation between block and sample grades where the number of drillhole samples is high. In all cases, the plots show that the block grades represent a smoothed version of the sample grades, indicating the Ordinary Kriging ‘smoothing’ process has performed as expected. Modelled lenses are also reviewed against detailed underground face mapping (Figure 12).

 

Model versus Composite Statistics

 

Model and 1m composite grades for each system are compared against wireframes and block model volumes. The sample and block grades are mostly within 10% of each other. In some cases, the sample grades are higher than the model grades, which often indicate the drilling is clustered on high grade zones. Ordinary kriging, by principal, is a least variance estimator and de-clusters the grades during the estimation process.

 

The wireframe and block model volumes compare well in all cases, with the difference in most cases <1%.

 

11.12Confidence Classification of the Mineral Resource Estimate

 

Table 11.2 summarises the CSA Mineral Resource classification criteria with respect to kriging efficiency and drill data density.

 

Table 11.2

 

CSA Mineral Resource Classification Criteria

 

Resource Category General Description Geostatistical Parameters
Measured

The majority of mineralization developed and mapped.

Sufficient diamond drill data to define contacts, continuity, grade and density with a high level of confidence.

Diamond drill spacing of approximately ≤ 20m north-south by 37.5m vertical for QTS North and 20m north-south by 20m vertical for other systems.

Majority search pass 1. Copper kriging efficiency > 40 RESCON=1
Indicated

Drill intersections are too widely spaced to ensure continuity, but adequate to assume continuity.

Features as for Measured can be estimated with a reasonable level of confidence.

Diamond drill spacing of approximately ≤ 40m north-south by 70m vertical (QTS North) and 40m north-south by 40m vertical (all other systems).

Majority search pass 1 and 2

Copper kriging efficiency > 20 < 40 where 1st pass is used.

RESCON=2

Inferred

Not enough data to reliably predict contacts and grade continuity.

Features as for Indicated can be estimated with a low level of confidence.

Diamond drill spacing of approximately ≥ 40m north-south by 70m vertical (QTS North) and 40m north-south by 40m vertical (all other systems). Drill density is sufficient to give confidence that the lens persists down plunge/ dip

Majority search pass 2 and 3

Copper kriging efficiency < 20 where 1st pass is used.

RESCON=3

 

11.13Reasonable Prospects of Economic Extraction

 

The calculation of the stope break-even cut-off grade used in the assessment of economic viability of Mineral Resources uses a mining cost of A$78/t moved, a processing cost of A$20/t milled, G&A costs of A$21/t milled. Further discussion is presented below in Section 12.5.

 

Commodity Price

 

The calculation of the stope break even cut-off grade is based on a copper price of US$8,279/tonne. This price aligns with the price used at CMPL for mine planning and is in line with long-term, real, Broker Consensus forecast copper pricing.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 66

 

 

 

Figure 13CUBE AUGUST 2023 RESOURCE LONG SECTION
BDA - 0230-04-April 2024Behre Dolbear Australia Pty Ltd

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 67

 

 

Depletion

 

The reported Mineral Resources have been depleted using surveyed wireframe volumes to flag blocks within each lode system (Figure 13). The QTS North, QTS Central, Eastern and Western block models were depleted with both 3D shapes related to development and depletion strings (“As-builts”). QTS South block model was depleted with strings only. The 3D shapes and depletion strings are supplied by on-site mining engineers. The resultant Mineral Resource is then assessed lens by lens, level by level, in conjunction with the mining engineers. Non-mineable components are excluded in spreadsheet format and the final resource tabulated.

 

Mineral Resource Reporting Cut Off

 

Interpretation of the high-grade mineralized lodes is consistent with that used historically at CSA (based on an approximate 2.5% cut off), which has proven to reconcile well with production. A new lower-grade halo around the high-grade zones has been introduced in 2023. This halo is based on an approximate 1.5% Cu cut off and represents mineralization which is including during mine planning.

 

The Mineral Resource estimate is based on lode definition using geologically defined structures and application of copper grade constraints in combination with an underground stope mining method requirement of reasonable prospects of economic extraction.

 

11.14Mineral Resource Estimate

 

The Mineral Resource estimate for the CSA Mine is reported here in accordance with the SEC’s SK1300 regulations. and the Mineral Resources are considered to have reasonable prospects of economic extraction. The Mineral Resources presented in this section are not Mineral Reserves and do not reflect demonstrated economic viability. The reported Inferred Mineral Resources are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as Mineral Reserves. There is no certainty that all or any part of this Mineral Resource will be converted into Mineral Reserve. All figures are rounded to reflect the relative accuracy of the estimates and totals may not add correctly. Mineral Resource estimates exclusive of Mineral Reserves are summarized in Table 11.3. on a 100% ownership basis.

 

The effective date of the Mineral Resource estimate is August 31st, 2023.

 

Table 11.3

 

Copper and Silver Mineral Resources Exclusive of Mineral Reserves as at 31 August 2023

 

(Based on a Copper Price of US$8,279/t at 1.5% Cu Cut-Off Grade)

 

System 

 

Resource

Category

 

Tonnes
Mt

  

Cu
%

  

Cu Metal
Kt

  

Ag
g/t

  

Ag Metal
Moz

 
All Systems  Measured   3.3    5.6    182    19    2.0 
   Indicated   1.4    3.4    47    6    0.3 
   Meas + Ind   4.7    4.9    229    15    2.3 
   Inferred   3.3    5.5    184    21    2.2 
   Total   8.0    5.2    413    18    4.5 

 

Notes:

 

·Mineral Resources are reported as at 31 August 2023 and are reported using the definitions in Item 1300 of Regulation S-K (17 CFR Part 229)(SK1300)
·Mineral resources are reported excluding Mineral Reserves
·The Qualified Person for the estimate is Mike Job, of Cube Consulting Pty Ltd
·Price assumptions used in the estimation include US$8,279/tonne of copper and US$22.60/troy ounce of silver; in line with long term Broker Consensus forecast copper pricing as at August 8, 2023
·Geological mineralization boundaries defined at a nominal 2.5% Cu cut off for high grade lenses, and 1.5% Cu for the lower-grade halo. Resources reported above a 1.5% Cu cut-off grade
·Costs assumptions underlying cut-off grade calculation include US$78/t ore mined, US$20/t ore milled and US$21/t G&A
·Metallurgical recovery assumptions used in the estimation were 97.5% copper recovery and 80% silver recovery
·Mineral Resources reported as dry, raw, undiluted, in-situ tonnes
·Figures are subject to rounding.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 68

 

 

11.15Factors that May Affect the Mineral Resource Estimate

 

Areas of uncertainty that may materially impact the Mineral Resource estimates include:

 

·movement in long-term metal price and exchange rate assumptions based on market dynamics outside the control of the Company

 

·changes in the local interpretations of mineralization geometry may occur as CSA continues to conduct exploration drilling, based on the results of such drilling; changes could include the presence of mineralization extensions, off-shoots, faults, dikes and other structures as well as changes to the continuity of shear geology, the continuity of mineralized zones and grade continuity assumptions

 

·changes to metallurgical recovery assumptions which may be driven by changes in mineralogy or processing plant operation

 

·changes to the grade threshold values applied to the lode definitions

 

·changes to environmental, permitting and approvals for the ongoing operation of CSA.

 

11.16Qualified Person’s Opinion on the Mineral Resource Estimate Process

 

The QP is of the opinion that the Mineral Resource estimate is well-constrained by three-dimensional wireframes representing geologically realistic volumes of mineralization. Exploratory data analysis conducted on assays and composites shows that the wireframes represent suitable domains for Mineral Resource estimation. Grade estimation has been performed using an interpolation plan designed to minimise bias in the estimated grade models.

 

Mineral Resources are constrained and reported using economic and technical criteria (geologically and grade defined thresholds and close proximity to mine infrastructure) such that the Mineral Resource has a reasonable prospect of economic extraction.

 

Mike Job of Cube Consulting Pty Ltd. is the Qualified Person responsible for the estimation of the Mineral Resources as at 31 August 2023. The QP believes that this Mineral Resource estimate for CSA mine is an accurate estimation of the in-situ resource based on the data available, has been prepared using industry standard accepted practice and conforms to the requirements of Subpart 229.1300 of Regulation S-K. The QP also believes that the available data and the resource model are sufficient and appropriate for mine design and planning.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 69

 

 

12Mineral Reserve Estimate

 

This section contains forward-looking information related to tonnage and grade for the project. The material factors that could cause actual results to differ materially from the conclusions, estimates, designs, forecasts or projections in the forward-looking information include any significant differences from one or more of the material factors or assumptions that are set forth in this sub-section including actual in-situ characteristics that are different from the samples collected and tested to date, equipment and operational performance that yield different results from current test work results.

 

12.1Introduction

 

CMPL estimates Mineral Reserves annually using the most current Mineral Resource estimate and Void Model to allow for mining depletion.

 

The mining method used at CSA is a combination of sublevel long-hole open stoping and Avoca stoping (for narrow mineralized lenses) with either paste or rock fill (discussed in more detail in Section 13). CSA uses Deswik® software (stope design and scheduling) for mine planning. The Mineral Reserve is the economically mineable part of the Measured and/or Indicated Mineral Resource post application of the relevant Modifying Factors.

 

The reference point for the Mineral Reserve estimate is the point of delivery to the processing plant.

 

The principal parameters used in the Mineral Reserve estimate for stope design and economic evaluation of the are as follows:

 

·cut-off grades were estimated and applied as outlined in Section 12.5

 

·dilution and recovery factors include allowance for overbreak dilution, fill dilution, and ore losses; the factors applied are based on historical stope performance and industry norms; waste dilution is assumed to have zero copper and silver grade

 

·the Mineral Reserve category is assigned based on the ratio of the contained Measured and Indicated Resource with Measured Mineral Resource converted to Proven Mineral Reserve, and Indicated Mineral Resource converted to Probable Mineral Reserve; any Inferred material included in the stopes is considered waste

 

·development, which must be mined to access the stopes, is treated as ore if ≥1% Cu.

 

BDA considers that the CSA reserve estimation procedures are generally appropriate. Estimating mine dilution at zero grade is a conservative assumption given that much of the diluting material will carry some copper mineralization.

 

12.2Development of the Mining Case

 

Mineral Reserves are reported within mineable stope shapes designed using Deswik® Stope Optimizer software (“DSO”). DSO uses an algorithm to generate minable shapes based on inputs specific to the geology and mining methods utilized at a specified cut-off grade. Characteristics of material inside the design wireframes, including tonnes and grades, are considered discretely.

 

Dilution factors are applied in addition to waste included within the design wireframes. The cut-off grade is applied following the inclusion of waste dilution factors.

 

Conversion of Mineral Resource to Mineral Reserve includes the following steps:

 

·import resource block model

 

·generate DSO shapes at 1.5% Cu cut off

 

·remove areas isolated from main operating areas, too close to existing excavations, areas near critical infrastructure, and stopes with limited strike length

 

·add pillars as required in areas adjacent to existing excavations to suit backfill type

 

·design mine development to suit the remaining stopes

 

·generate altered block models with zero grades for any material other than Measured or Indicated Resources

 

·re-evaluate stope and development wireframes using the altered block model

 

·apply Reserve stoping cut-off grade of 1.65% Cu after the application of dilution factors in Deswik scheduling software, and development cutoff grade of 1.00% Cu

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 70

 

 

·cut-off grade of 2.20% Cu is applied to stopes planned to be mined prior to December 31st, 2026, to manage metal production during a period of increasing mining rates

 

·remove areas of the design which are not required for the extraction of Reserve material

 

·validate scheduled tonnes by comparing to manual batch interrogations against the block models

 

·validate the Mineral Reserve reported in Deswik.Schedule by using MS Excel to duplicate the application of modifying factors, cut off, and classification calculations

 

·generate a mining schedule

 

·confirm economics using a discounted cash flow model.

 

12.3Design Guidelines

 

The CSA mine uses several variations of long-hole open stoping. The majority of production utilizes underhand long-hole open stoping, augmented by overhand long-hole open stoping and modified Avoca stoping. Ore is hauled via truck to one of two hoisting shafts, referred to as No. 1 or No. 2 shafts.

 

There are several production areas as shown in Figure 3, each with its own block model. A block model cell size of 5m x 5m x 10m is used for Mineral Reserve estimation. This block size is considered appropriate for the selectivity and mining methods used.

 

12.4Modifying Factors

 

Modifying factors have been based on the historical stoping performance as captured in the CSA reconciliation database and considering industry norms. A production reconciliation process is maintained at CSA, the results of which have been used to analyse stoping performance and to determine usable modifying factors for the 2023 Mineral Reserve.

 

During the reserve mine design process, all material within the design wireframes not classified as Measured or Indicated Mineral Resource is considered to be internal waste or planned dilution. External or unplanned dilution is applied as a mining dilution factor in addition to the designed or planned dilution. The factor varies based on mining method, historical performance, and comparable industry values. The external or unplanned dilution is generally derived from overbreak in the hangingwall/footwall or failed backfill material.

 

Mining/Reserve recovery is a percentage factor applied to the diluted tonnage and represents ore which cannot be recovered during mucking. The recovery factor is based on historical performance. Table 12.1 shows the dilution and recovery factors applied to the Mineral Reserve Estimate as well as historical values from the previous three years. It should be noted that historical dilution factors for longitudinal and modified Avoca stope types are high by industry standards. The tonnes extracted using these stope types over the previous three years was relatively small, and therefore may not be representative. The QP considers that these dilution factors could be reduced using typical drill and blast controls, and that the factors applied to the Mineral Reserve Estimate are reasonable.

 

Table 12.1

 

Dilution and Recovery Factors

 

Stope Type  Historical Dilution   Reserve Dilution   Historical Recovery   Reserve Recovery 
Transverse   13%   13%   99%   99%
Longitudinal   25%   20%   91%   92%
Modified Avoca   35%   26%   97%   92%

 

12.5Cut-off Grade and Input Assumptions

 

The cut-off grades were determined based on the economic evaluation of historical cost and performance data, estimated future operating and capital costs assumptions and global macroeconomics, including revenue factors and price assumptions. The cut-off grade is the grade above which the mineable shapes can be mined profitably and therefore converted to Mineral Reserves.

 

The cut-off grades were calculated considering the value of both copper and silver. It is noted however that copper represents 97% of the contained value. There are no other minerals of economic value. Cut-off grades were based on an analysis of 2022 and 2023 historical operating costs, and modelled costs for 2024 to 2026. The cut-off determination considers a revenue factor of 90% of copper in concentrate at the mine gate, averaged over the Mineral Reserve life, to account for logistics and realization costs. For the purposes of cut-off grade calculation, the revenue factor for silver is 100%, however as silver is subject to a streaming agreement it is considered cashflow neutral within mine economic assessments.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 71

 

 

Three cut-off grades were calculated:

 

·Development incremental cut off

 

·Stoping incremental cut off

 

·AISC (All in Sustaining Capital) cut off

 

The development incremental cut-off is the calculated grade for development material which is broken during required development and therefore need only cover the incremental cost of hoisting, processing, and smelting. Although this worked out to be less than 1.0% Cu, for practical reasons the cut off was kept at 1.0% Cu as this was considered to be the minimum grade that could practically be segregated.

 

The stoping incremental cut-off considers all operating costs except general and administrative and capital development. A stoping cut-off grade of 2.20% Cu was estimated until the end of 2026, after which point a stoping cut off of 1.65% Cu is used. The higher cut-off is applied to manage metal production during a period of increasing mining rate. The AISC cut off considers all operating and capital costs.

 

The increment cut offs shown in Table 12.2 were applied to the Mineral Reserve estimate and are based on the values seen during steady-state operation.

 

Metal Price Assumptions

 

Price assumptions used in the Mineral Reserve estimate are applied as at 31 August 2023 and are summarized as follows:

 

·Copper Price - US$8,279/t (US$3.76/lb) - the Company elected to adopt the long-term, real, Broker Consensus forecast copper prices outlined in Section 16.4

 

·Silver Price - US$22.60/oz - the Company elected to adopt the long-term, real, Broker Consensus forecast silver prices outlined in Section 16.7

 

·A$/US$ Exchange Rate - 0.71 - the Company elected to adopt the long-term, real, Broker Consensus exchange rate.

 

Input Parameters

 

The cost inputs for the August 2023 Mineral Reserve estimate are based on the CSA’s internal budgeting process. With its long operating history, CSA has a thorough understanding of the mining, processing, G&A, and other costs associated with the operation.

 

Key input parameters used in the calculation of cut-off grades used for the estimation of Mineral Reserves are summarized in Table 12.2.

 

Table 12.2

 

Summary of Mineral Reserve Input Parameters

 

Parameter  Unit  Value 
Copper Price  US$/t Cu   8,279 
Copper Revenue Factor  %   90 
Copper Recovery  %   97.5 
Silver Price  US$/oz   22.60 
Silver Revenue Factor  %   100%
Silver Recovery  %   80 
Mining Cost (excl. Capex)  US$/t mined   78 
Processing Cost  US$/t milled   20 
G&A Costs  US$/t milled   21 
Incremental Development Cut Off  % Cu   1.00 
Incremental Stoping Cut Off  % Cu   1.65 
AISC Cut Off  % Cu   2.23 

 

*Revenue factor accounts for all costs from mine gate (incl. freight, realization charges and offtake costs)

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 72

 

 

Metallurgical Recoveries

 

Ore has been processed at an onsite conventional flotation concentrator since circa 1965. This produces a concentrate which is sent off-site for smelting and refining to produce copper cathode.

 

The metallurgical performance of the CSA plant is well understood and has generally remained stable over the past 6 years (Table 5.1). Copper recovery to concentrates from 2017 to 2023 averaged 98%. Recovery of silver, the only by-product, averages about 80%. Concentrate Cu grades averaged 26.1% Cu and contains approximately 80g/t Ag.

 

Copper processing recoveries at the CSA concentrator are expected to average 97.5% over the life of the Mineral Reserve. Silver recoveries are forecast at 80% over the same period.

 

12.6Mineral Reserve Estimate

 

The Mineral Reserve estimate for the CSA Mine is reported here in accordance with the SEC SK1300 regulations and is considered to be the economically mineable component of CSA’s Measure and Indicated Resources. The reported Inferred Mineral Resources are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as Mineral Reserves. All figures are rounded to reflect the relative accuracy of the estimates and totals may not add due to this rounding. CSA Mineral Reserves are summarized in 12.3, on a 100% ownership basis, and have an effective date of August 31st, 2023.

 

Table 12.3

 

Copper and Silver Mineral Reserves as at 31 August 2023 - Based on a Copper Price of US$8,279/t

 

System 

 

Reserve
Category

 

Tonnes
Mt

  

Cu
%

  

Cu Metal
Kt

  

Ag
g/t

  

Ag Metal
Moz

 
All Systems  Proven   8.3    3.5    293    14.4    3.9 
   Probable   6.6    3.1    201    11.2    2.4 
   Total   14.9    3.3    494    13.0    6.2 

 

Notes:

 

·Mineral Reserves are reported as at 31 August 2023 and are reported using the definitions in Item 1300 of Regulation S-K (17 CFR Part 229)(SK1300)
·The Qualified Person for the estimate is Jan Coetzee, an officer of the Registrant’s Australian subsidiary
·Price assumptions used in the estimation include US$8,279/tonne of copper and US$22.60/troy ounce of silver; in line with Long Term Broker Consensus forecast copper pricing as at August 8, 2023
·Mineral Reserves reported as dry, diluted, in-situ tonnes using a Stope cut-off grade of 2.2% Cu for 2024 to 2026, a stope cut-off grade of 1.65% for the remaining periods and a Development breakeven cut-off grade of 1.0% Cu
·Costs assumptions underlying cut-off grade calculation include US$78/t ore mined, US$20/t ore milled and US$21/t G&A
·Metallurgical recovery assumptions used in the estimation were 98.5% copper recovery and 80% silver recovery
·Figures are subject to rounding to reflect the accuracy of the estimate.

 

12.7Factors that may affect the Mineral Reserve Estimate

 

With over 56 years of operating history and a detailed understanding of these factors, the QP considers that essential controls are in place for CSA to effectively manage these factors, minimising the risk of significant impact on the Mineral Reserve estimate.

 

In the QP’s opinion, the following factors may affect the Mineral Reserve estimates, including:

 

Metal Prices: the Mineral Reserve estimates are most sensitive to copper prices (less so to silver prices).

 

Metallurgical Recovery: changes in metallurgical recovery for copper (less so for silver) could have an impact on the Mineral Reserve estimates.

 

Changes in Operating Costs: operating costs that are higher or lower than those assumed in the estimation process could affect the Mineral Reserve estimates. Inflationary pressures within Australia could increase operating costs over the life of mine leading to a reduced Mineral Reserve estimate (assuming other assumptions such as copper price remained unchanged). Conversely, any reduction in operating costs could lead to improved economic conditions and an increase in the mineral reserve estimate.

 

Increased Dilution and Ore Loss: dilution and ore loss form key components of the modifying factors used in the determination of Mineral Reserves. Any unforeseen geotechnical issues could lead to additional dilution, difficulty accessing portions of the orebody, or sterilization of ore. CSA conducts continuous geotechnical drilling and has extensive knowledge of the geotechnical conditions of the mine, both of which are taken into consideration during mine design in order to effectively mitigate geotechnical risks. Preliminary designed underground stopes have been evaluated for stability in several geotechnical studies and are regularly evaluated by the engineering group at the mine.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 73

 

 

There are opportunities to improve on the reconciliation database to ensure the process is consistent and repeatable, leading to improved modifying factors. Changes to the mine design and stoping front for QTSC, coupled with the current implementation of paste fill, could see reductions in both dilution and ore loss factors. Dilution factors could also improve in the Western area when implementing localised rib and island pillars.

 

Permitting and Approvals: any inability to maintain, renew, or obtain environmental and other regulatory permits, to retain mineral rights, extend tailings storage capacity or continue safe mining operations could have a negative influence on Mineral Reserve estimates.

 

In-Mine Exploration Potential: as per requirements under Subpart 229.1300 of Regulation S-K, the CSA estimated Mineral Reserve is limited to Measured and Indicated resource material only, that also satisfies the Mineral Reserve economic criteria and modifying factors. However, due to the steeply dipping nature of the mineralized lenses, detailed drilling (sufficient to classify the material as a Measured or Indicated resource) is limited in depth extent to 100-200m below the nearest suitable underground development horizon. Deeper drilling is relatively sparse, but nevertheless indicates continuity of the mineralized lenses in depth. As the drill density at depth is only sufficient to classify this material as Inferred, at best, it cannot be included in the Mineral Reserves.

 

In the QP’s opinion, the estimated Mineral Reserve thus represents a comparatively conservative guide to the future mining potential. To provide a more realistic guide to the overall Life of Mine (LOM) potential, CSA annually completes a life of mine planning process which includes Inferred resources and projections of lenses down dip where, as mentioned, the drilling is relatively sparse, but nevertheless indicates continuity of the mineralized lenses in depth and provides geological evidence that the mineralized lenses continue; and further drilling will test options and guide the placement of required mining infrastructure.

 

12.8Qualified Person’s Opinion on the Mineral Reserve Estimation Process

 

The Qualified Person considers that the Mineral Reserve estimate for CSA mine and presented in this report is an appropriate estimation of the diluted, in-situ, and economically viable Mineral Reserve based on the latest Measured and Indicated Resource data available, and has been prepared using logical and industry standard accepted practices conforming to the requirements of Regulation S-K. The QP is of the opinion that the Resource block models used to determine the appropriate Reserve mine design provide a reasonable guide to the in-situ mineralization, and that the historically based modifying factors are consistent with actual mining and processing experience at CSA. The LOM forecasts based on the Mineral Reserves are considered to provide a conservative estimate of the likely life of mine, given the historical experience of regular reserve replacement and the known down-dip extensions of the mineralized lodes.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 74

 

 

13Mining Methods

 

13.1Introduction

 

The CSA mine is an established underground mine which has been operating for the past 56 years using similar mining and processing methods as those which are used in the operation today. CSA extracts approximately 1.1-1.4Mtpa of copper ore each year from five en-echelon steeply dipping orebodies, with current mining focused on the QTSN, QTSC and Western systems, with QTSN and QTSC supplying the bulk of the ore and representing 84% of the contained copper in the current Mineral Reserves. Silver mineralization accompanies the copper and contributes approximately 3% to revenue.

 

The mine uses mechanized long-hole open stoping (LHOS) with cemented paste fill (CPF) as the preferred mining method. A modified Avoca stoping method has historically been used successfully in the narrower lenses (principally QTSC, Eastern and Western). In the past 12 months, QTSC and Eastern orebodies have transitioned to LHOS with CPF (driven by the introduction of paste reticulation to these areas), whilst a new temporary rib pillar mining method (utilising wireless blasting) will be utilized in the Western orebody. The future dominance of the QTSN orebody, representing approximately 68% of the currently estimated Mineral Reserve, creates some concentration risk. Mineral Resources in the other orebodies and remnant areas of the mine create contingent ore sources. One of the critical aspects to achieving production objectives is prioritising and increasing the mine development, ventilation capacity in the lower mine levels and access to additional drilling and extraction horizons.

 

Figure 14 shows a schematic diagram of a typical long-hole open stope that has been partially extracted before filling, together with a general arrangement of long-hole open stopes on three levels that are in the process of being extracted (brown coloured stopes) and then backfilled (white coloured stopes) with cemented paste fill supplied from a surface borehole. Long-hole open stoping has been used extensively over the life of the CSA mine, and is mechanized, cost-effective, and well suited to the geometry and operating conditions in the QTSN, QTSC and Eastern systems.

 

In QTSN, sub-level intervals are 30m apart above 8580mRL, approximately 1,620m below surface (“mbs”). Below 8580mRL, the sub-level interval was increased to 40m, leading to some negative impacts with increased ground failures and higher levels of overbreak and stope dilution; sub-level intervals have more recently been reduced to 35m. Stope dimensions are typically 20m long by 25m wide. Mining is non-entry and ground support is employed to control dilution and overbreak prior to the placement of backfill and to support extraction development.

 

Figure 15 shows a schematic cross section through a modified Avoca stoping sequence. This method is used in narrower orebodies such as the Western lodes and relies on backfilling with waste rock to provide support as the ore is progressively blasted and removed from the stope. While the Avoca method has proven an effective mining method at CSA, benefiting from having a degree of passive wall support from the waste rock (long-hole open stopes have to be completely extracted before filling can commence), the Avoca stopes can suffer from higher ore losses, increased waste dilution, and backfilled waste rehandling.

 

The level interval in QTSC is a combination of 25m and 30m intervals, whilst the Western and Eastern systems both use 30m intervals. Orebody widths for the three systems are between 6-10m. In the modified Avoca method, mining begins in the central area of the ore zone and progresses towards both ends of the ore drives. The stopes are drilled with either upholes or downholes. A slot is established to create the initial void for subsequent stope firing. The rings are then fired in slices to a stope length as allowed by the stability assessment and then bogged clean. The empty stope is then filled with waste rock from the upper sub-level. The filled stope is then mucked out to a natural angle of repose and subsequent rings are blasted to a free face.

 

The QTSC orebody is split into two zones, QTSC Lower and QTSC Upper. QTSC Lower extraction is based on 25m level intervals utilising blind uphole stoping with cemented pastefill. QTSC Upper extraction utilizes 30m level intervals, utilizing a mix of uphole and downhole stoping, with a mix of pastefill and rockfill.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 75

 

 

 

 

 

 

Figure 14 SCHEMATIC - LONG HOLE OPEN STOPING MINING METHOD
BDA - 0230-04-April 2024 Behre Dolbear Australia Pty Ltd

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 76

 

 

 

 

Figure 15 SCHEMATIC - AVOCA MINING METHOD
BDA - 0230-04-April 2024 Behre Dolbear Australia Pty Ltd

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 77

 

 

Diesel load-haul-dump (“LHD”) units load broken ore from the stopes into diesel-operated trucks. The ore is hauled from the stopes for up to 7-8km to the underground crushers located at the base of the two hoisting shafts. Truck haulage distances to the underground crushers will increase as stoping gets deeper, adding to truck cycle times, requiring more trucks, and adding to the ventilation requirements, all of which is considered during the mine planning processes. In 2023, the mobile fleet was replaced with new 17t LHD units and 63t payload trucks. Improving average payloads across the operation, along with improved utilization and cycle-time could assist in partially offsetting the increased haul distances at depth.

 

From the underground crusher, ore is hoisted to surface in the two hoisting shafts:

 

·No. 1 shaft hoists from 10 level (895m underground) to surface, has a capacity of 700kt per annum (“ktpa”) and is used for ore and waste hoisting only; No. 1 shaft has previously been upgraded with a new headframe and double-drum winder

·No. 2 shaft hoists from 9 level (810m underground) to surface, has a capacity of 1.6Mtpa and is used for both men and material hoisting and ore hoisting; No. 2 shaft has previously been upgraded with a new Koepe winder and control system.

 

The Reserve LOM extends a further 4 levels (4 x 35m) from the current deepest levels of stoping. The recent upgrades in ventilation and cooling along with the new fleet and further planned ventilation upgrades will be sufficient to mine the mine plan presented in this report.

 

13.2Blasting

 

All stope blasting is conducted with emulsion or Ammonia Nitrate/Fuel Oil (“ANFO”) explosives, in 102mm blast holes. For the main ore lenses, a raise bore slot is developed to create an opening from a crosscut drive at the top of a stope, down to a strike drive on the extraction (bottom) level. The slot is opened in two shots. The remainder of the stope is then drilled and fired as a number of rings that are fired into the void created by the slot. Smaller lenses would generally be extracted in a similar manner, except that a longhole rise pattern of drill holes may be used to create the slot rather than a raise bore.

 

13.3Geotechnical Parameters

 

Overview

 

Rock mass conditions are generally good in the upper areas of the mine, however mining at depth has been accompanied by a notable increase in stress response. Conditions associated with active production areas have historically been highly variable. The variable response of the rock mass to mining is a function of lithology and rock mass conditions, increasing depth and associated in-situ stress, and local extraction sequencing. The host rock mass at CSA comprises dominantly steeply dipping, thinly bedded siltstone. The bedding strikes north-northwest and dips west at 80°. The host rock mass also has a northerly trending axial planar cleavage that dips steeply east (80°). Within the siltstone unit, bedding and cleavage are the dominant structures with the intensity varying throughout the mine. In addition to the foliation, certain rock types have been altered to talc which has very low strength, cohesion and friction properties, and is therefore susceptible to deformation when exposed.

 

Stress-driven shear and buckling damage leading to closure of underground excavations is common at depth, to the extent that single-pass intensive support and reinforcement is not always adequate to maintain serviceability over modest service-life periods. Progressive yielding of the highly bedded, strongly anisotropic rock mass has proven problematic in some instances, exacerbated by locally poor conditions associated with weak alteration zones, poor development positioning or geometries, and local extraction sequences.

 

The mineralization is typically associated with a shear zone which can also impact on the footwall drive. High deformation and buckling ground conditions are experienced in the footwall shear zone, and in high stress locations in the ore zone where drives are aligned with foliation and are impacted by the stoping stress abutment.

 

To mitigate these issues where possible, the development is preferably mined perpendicular to the foliation planes. Unmanageable conditions can be generated by high stress concentrations created by retreating to central accesses, whether these are crown pillars or central rib pillars and, therefore, such conditions are avoided during the mine design and planning process.

 

Rock Strength and In-Situ Stress

 

Geotechnical core logging of RQD and Q Prime parameters is undertaken for all drilling and has been collected for over 20 years; this together with the detailed geology mapping completed on all development levels forms an excellent basis for assessing the ground conditions at the mine. Laboratory testing of rock strength indicates average uniaxial compressive strength of the unmineralized siltstone of 122 mega pascals (“MPa”) with an average density of 2.8t per cubic meter (“t/m3”) and for the mineralized siltstone, 156MPa with an average density of 3.48t/m3.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 78

 

 

Stress measurements have been undertaken at the mine using several different methods. The results are reasonably consistent. The three principal horizontal stress orientations are - Sigma 1: 278° (approximately east-west), Sigma 2: 185° (approximately north-south) and Sigma 3: (approximately southwest-northeast).

 

Currently the deepest mining level is the 8465mRL (1,805mbs), the decline advance is currently at 8395mRL (1,875mbs) and the current mine design will complete mining at the 8290mRL (1,980mbs). Due to the number and consistency of the stress measurements, there is reasonable confidence in the results, which indicate that at the current deepest mining level at 1,805mbs, the in-situ maximum principal stress is 61MPa. A nominal increase is expected at the final Reserve mining depth of 1,980mbs. Once the mine reaches 8205mRL (2,200mbs), the principal stresses experienced are expected to reach approximately 72MPa. Additional stress measurements are required to confirm the stress magnitudes and orientation at and beyond this depth, though this is beyond the current Reserve LOM.

 

RQD block model plots of the ground conditions for the current 8465 mining level down to 8290mRL (1,980mbs) in QTSN demonstrate that there is no significant change to the ground conditions expected as the mine progresses with depth.

 

Mining Implications

 

QTSN and QTSC contain approximately 84% of the current Mineral Reserve copper production, with lesser contributions from other areas, QTSS, Eastern and Western. QTSN, QTSC and the Eastern deposits are mined using long-hole open stoping, mined top down (and bottom-up in QTSC) and backfilled with cemented paste fill (CPF). The Western lodes were historically mined using the modified Avoca mining method with loose rock fill (“LRF”) used to backfill the stopes, however, in late 2023 CSA transitioned to the temporary rib pillar method, a more efficient and safer method for CSA where wireless blasting and LRF are used.

 

In plan, QTSN consists of several thicker central lenses which taper to a single economic ore zone at the northern and southern extremities. The central section is amenable to transverse mining, allowing crosscut development perpendicular to the foliation. The extremities are mined using longitudinal stoping requiring strike development; narrower lenses are mined using an Avoca method with LRF used as backfill and have traditionally been mined early in the sequence before the transverse central area mining is complete. This layout minimizes development, but results in high stress closure pillars being formed. CMPL is now changing this sequencing to mine the central stopes first and progress outwards (Figure 3).

 

Below 8580mRL the sublevel spacing was increased from 30m to 40m in QTSN with the intent of reducing the number of sublevels required and moving the sublevels out of the immediate high stress abutment below previously mined areas. However significant overbreak occurred in these stopes and future sublevel spacings have been reduced to 35m to prevent a repeat of these failures.

 

As mining gets deeper, and more of the orebody is extracted there will be an increase in the in-situ stress and the abutment stresses will increase. The underhand stoping method utilized in QTSN is considered appropriate to manage these conditions, but the stoping sequence may need to be modified.

 

With the establishment of paste reticulation to QTSC, the modified Avoca mining method previously used has been replaced with long-hole open stoping. Access to the QTSC is currently from the central zone of the orebody, with mining fronts advancing both upwards and downwards from the main accessway. The addition of paste fill assists in further reducing dilution associated with rock fill and overbreak.

 

Production Sequencing

 

A 2017 geotechnical report from Itasca Australia Pty Ltd (“Itasca”) suggested that the CSA ground conditions can best be managed by top-down mining under CPF, adopting a center out retreat with a V-shaped chevron retreat between levels and the creation of a de-stress slot along the hangingwall to protect the footwall development and stopes. Reduction in stope dimensions (height) would likely improve operating conditions but would also add to the development requirements. This was recommended instead of retreating to a central pillar and advancing upwards to a crown pillar, as was the practice at that time. For transverse stoping, the change to centre-out sequencing would be facilitated by the multiple cross-cut accesses. However, centre-out benching requires additional footwall and crosscut development to provide access to the northern and southern ends of the orebodies, adding to development cost and time.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 79

 

 

In July 2022, the Glencore Geotechnical Review Board (“GRB”), a panel of internal and external geotechnical experts including recognised independent specialists, Dr Iain Thin (Director of Applied Geomechanics Consulting) and Dr Charles Lilley (Director of KSCA Geomechanics), conducted a detailed review of CSA geotechnical conditions and practices. Following their review, the decision was made to accelerate transition of QTSC to end-access (instead of centre-out) and paste fill operations, for improved stability and reduced dilution.

 

Figure 3 shows that a top-down centre-out sequence has been adopted for QTSN, and for QTSC the stoping is adopting an end access, retreat process, mining both upwards and downwards as per recommendations from the GRB.

 

BDA considers the geotechnical risk to be medium though with risk-based mine design and sequencing, the risk should be manageable. With the adoption of recommendations from Itasca and the GRB, further improved sequencing at QTSC, transition to paste fill in QTSC and Eastern, along with the acceleration of development into Eastern, BDA believes the Reserve LOM to be achievable and well within the CSA’s standard operating practices.

 

Ground Support

 

The ore drives are accessed from a footwall drive that is angled to cut across the strike of the ore body to minimize the effects of squeezing, however, extensive ground support and reinforcement is still required. Both the decline and the footwall drives are supported with mesh and fibre-reinforced shotcrete, together with rock bolts and 6-8m-long twin-strand cable bolts. Crosscut drives mined perpendicular to the foliation are supported with weld mesh and 2.4m rock bolts.

 

Whilst the crosscuts are generally stable, several sections of decline and the footwall drive show poor ground conditions despite the ground support installed. Drives that are aligned with the foliation in areas of high fracture frequency are more likely to deform and are susceptible to failure. Geotechnical modelling will be important to identify areas where unfavorable conditions are likely to occur, to allow appropriate mitigation methods (drive orientation and appropriate ground support) to be adopted.

 

The CSA principal geotechnical engineer is undertaking a review of current ground support practices and previous technical studies, as part of an ongoing intent to rationalize and optimize the ground support installations at the mine.

 

Seismicity

 

The mine has a seismic monitoring system installed for measuring the location and magnitude of seismic events. Despite the mining depths and high stresses, damaging seismicity has not been reported. This is most likely due to the absence of stiff rock units or stiff structures which can store the strain energy necessary for damaging seismic events, with the strain being taken up by movement on foliation planes.

 

13.4Backfill

 

The principal mining method used of long-hole open stoping requires cemented backfill to fill the stopes post mining and prior to extracting adjacent stopes. Strength requirements are generally achieved by addition of up to 3% Portland cement by weight, giving a fill strength of 0.4Mpa; selected areas such as crown pillar extractions may require stronger cemented fill of around 1MPa, achieved with cement addition rates of about 6%. Isolated stopes are filled with un-cemented bulk fill only, using development waste.

 

In certain locations cemented rock fill (“CRF”) is used; CRF is a blend of development waste rock, Portland cement, and water, which is mixed in a dedicated mixing bay mined on each level where required. The CRF is placed into the stope before filling with uncemented rock fill.

 

With the introduction of paste fill, the original cemented hydraulic fill (“CHF”) plant is no longer utilized and would require significant maintenance before it could be brought back into production.

 

Paste Fill

 

The paste fill plant was built in 2018 by Quattro Project Engineering (“QPE”) and was initially operated on a hire basis before the plant was purchased by CMPL in 2020, although the operation and maintenance of the plant transitioned to CMPL operations in late 2022. Paste fill is obtained by removal of water from the full tailings stream through vacuum filters at the paste fill plant to produce filter cake and adding cement as required. The paste fill plant runs as required when fill is required to fill stopes; at other times process tailings are dewatered and stockpiled adjacent to the plant for future use. On average, 45% of the process tailings are used as paste fill, with the remaining 55% pumped directly to the STSF. An ongoing improvement process is underway that may result in reduction of cement usage, or use of alternative slag and lime blends to reduce cement usage.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 80

 

 

Paste Fill Reticulation

 

The paste fill is delivered from surface to 9430RL underground via a single 835m long borehole with an outer 250mm casing and inner replaceable casing of 110mm diameter.

 

The underground reticulation system comprises steel pipe rated to 10MPa. These lines connect with inter-level boreholes, three of which are cased with steel pipe; the remainder are unlined drill holes. The reticulation system is currently around 1,850m in total length. An expansion of the reticulation network has been completed to the southern section of QTSN at depth, into QTSC and Eastern.

 

The elevation difference from the surface plant to the underground delivery points poses a risk of over-pressurization of the reticulation system, with potential for bursts, blockages, and hazards to personnel. Consequently, a key facet of the system is automated control including pressure sensors. The single delivery borehole poses some reliability risk and may warrant consideration of establishing a second hole. CMPL considers blockages and pipe damage to be the main risks for the paste fill system and has increased borehole monitoring and maintenance and is considering the potential duplication of the delivery line to provide some redundancy to its operation.

 

Filling Status

 

Discussions with mine management during the site visit suggest that available stope voids in the active mining areas have been filled. There is some uncertainty regarding the extent of stope voids remaining in the old mining areas in the upper levels of the mine, a major consideration for any plans to mine the remnant resources in the upper levels.

 

13.5Hydrogeological Parameters

 

There is minimal ground water inflow into the mine and this condition is not expected to change with depth. Groundwater has little impact on the geotechnical conditions in the mine and there is minimal need for mine dewatering.

 

13.6Other Mine Design and Plan Parameters

 

For additional parameters used in CSA’s mine design and planning process such as orebody-specific design guidelines, mining dilution and ore loss, reference should be made to Section 12 Mineral Reserve Estimate, including Section 12.3 Design Guidelines and Section 12.4 Modifying Factors.

 

13.7Mine Schedule

 

As part of the Mineral Reserve estimation process, CSA establishes a detailed schedule of mining physicals in which Mineral Reserves are mined, transported, hoisted, processed and sold as final concentrate product. Scheduling of mining stopes is developed using Deswik Scheduler software which combines both automated and manual scheduling processes to ensure that a practical, productive and profitable mining sequence occurs. Iterative schedule smoothing is often required in order to deliver consistent ore tonnes and grade to the processing plant whilst managing mobile fleet availability and maintenance outages across fixed and mobile assets.

 

CSA underground mining production is the primary driver to annual concentrate sales, due to the excess capacity available in downstream infrastructure. With approximately 2.3Mtpa material hoisting capacity in the shafts and 1.4Mtpa concentrate processing capacity in the processing plant, CSA scheduling is mining-centred and is currently planned at 1.2-1.4Mt of ore per annum (1.2-1.4Mtpa) for the Reserve estimation process.

 

Recovery assumptions used in the mine scheduling process are 97.5% for copper and 80% for silver.

 

Table 13.1 summarizes key physicals for the CSA Reserve schedule, including ore/waste tonnes, grade, recoveries and concentrate production.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 81

 

 

Table 13.1

 

CSA Mine – Mineral Reserve Production Schedule 2024-2034

 

Description  Unit  Total/Avg  2024  2025  2026  2027  2028  2029  2030  2031  2032  2033  2034 
Ore  kt  14,569  1,068  1,286  1,400  1,400  1,400  1,398  1,395  1,396  1,400  1,391  1,035 
Waste  kt  2,479  580  652  558  236  186  54  74  92  38  6  2 
Total Material Moved  kt  17,048  1,649  1,939  1,958  1,636  1,586  1,451  1,468  1,488  1,438  1,397  1,037 
Development - Capital  m  39,300  8,174  8,241  7,949  4,928  4,654  1,260  1,312  1,307  1,018  433  23 
Development - Operating  m  14,753  4,421  4,671  3,285  1,191  599  91  236  206  14  20  19 
Development - Total  m  24,547  3,753  3,571  4,665  3,738  4,054  1,169  1,075  1,101  1,004  413  4 
Ore Milled  kt  14,569  1,068  1,286  1,400  1,400  1,400  1,398  1,395  1,396  1,400  1,391  1,035 
Cu Feed Grade  %  3.29% 3.64% 3.34% 3.58% 3.52% 3.46% 3.43% 3.09% 3.04% 3.06% 2.85% 3.20%
Ag Feed Grade  g/t  12.86  15.65  12.07  14.22  13.07  12.57  12.77  11.65  12.08  12.63  11.29  14.46 
Cu Contained in Feed  kt  478.8  38.9  43.0  50.1  49.3  48.4  47.9  43.1  42.5  42.8  39.7  33.1 
Ag Contained in Feed  koz  6,023.1  537.5  499.0  640.0  588.2  565.6  573.9  522.3  542.3  568.4  505.0  481.1 
Cu Concentrate Produced  dmkt  1,795.4  145.8  161.3  187.8  185.0  181.4  179.7  161.7  159.4  160.6  148.7  124.0 
Concentrate Cu Grade  %  26.0% 26.0% 26.0% 26.0% 26.0% 26.0% 26.0% 26.0% 26.0% 26.0% 26.0% 26.0%
Concentrate Ag Grade  g/t  83.5  91.8  77.0  84.8  79.1  77.6  79.5  80.4  84.7  88.1  84.5  96.6 
Cu Recovery  %  97.5  97.5  97.5  97.5  97.5  97.5  97.5  97.5  97.5  97.5  97.5  97.5 
Ag Recovery  %  80.0  80.0  80.0  80.0  80.0  80.0  80.0  80.0  80.0  80.0  80.0  80.0 

 

13.8Mining Fleet Requirements

 

The existing underground mining fleet is industry standard, as summarized in the Table 13.2 below. One battery electric LHD is being trialled at CSA and is reported to demonstrate good productivity over a 6-7-hour period, requiring 2-3 hours to recharge.

 

Table 13.2

 

Primary CSA Underground Mining Equipment as at February 2024

 

Make  Model  Quantity 
Sandvik Cable bolter  DS421-C   2 
Epiroc Simba Production Drill   E7C   3 
Jumbo Development Drill  DD421-60C   3 
Sandvik Truck  TH663i   7 
Epiroc Truck  MT6020   1 
Epiroc Truck  MT5020   2 
Sandvik LHD  LH517i   8 
Epiroc LHD  ST14 BEV   1 

 

Equipment Productivity and Usage

 

Equipment performance differs between the fixed and mobile plant with availability and utilization being reported as shown in Table 13.3 for the 2023 calendar year. Maintenance of fixed and mobile equipment appears adequate and effective given the age of some of the equipment.

 

Table 13.3

 

Plant and Equipment Availability and Utilization – 2023

 

Equipment  Development Drills  Production Drills  Loaders  Trucks  Hoist
(Both Winders)
  Mill/Plant
Availability  80%  81%  73%  82%  75%  82%
UoA  42%  32%  47%  48%  53%  80%
Productivity  13m/day  133m/shift  36t/ophr  31t/ophr  217t/ophr  126t/ophr

 

Note: UoA = Utilization of Availability, ophr = Operating hour

 

CMPL reports that the current principal bottleneck in production relates to the bogging and trucking of ore. In 2023, CMPL completed a process of purchasing new equipment to replace the high-hour trucks and LHDs. Ten trucks and eight underground LHDs were replaced with a new Sandvik diesel fleet. The replacement LHDs are Sandvik 17.2t capacity LH517i. The replacement trucks are 63t Sandvik TH663i.

 

BDA considers that upgrading the ageing mobile equipment fleet is necessary and should improve availability. Standardization of truck and LHD models is sensible. However, the greater issue with all underground fixed and mobile equipment has been poor utilization. BDA notes that this is an area of review for CMPL. Issues that have been identified include operator shortages, work site availability, downtime due to shift changes, refuelling and tramming time to the work site and less than optimal planning. CMPL has advised that it is working on improvements in these areas.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 82

 

 

13.9Mine Personnel Requirements

 

Mining department manning as at end 2023 comprised 295 full-time employees, for a total CSA workforce of 479 against a budget of 573 for 2023. The organizational structure is reasonably typical, split into Production, Development, Services, Mobile Maintenance, and Technical Services. Each department is the responsibility of a Superintendent who reports to the Mining Manager. In general, the underground workforce is skilled and experienced.

 

CMPL reports that staff shortages have been a contributing factor to under-performance in the mine over the last two years. Several senior staff are employed on a fly-in fly-out (FIFO) basis.

 

CMPL’s forecast manning for 2024 for the entire operation is approximately 500, with similar levels to be maintained for the remainder of the Reserve life of mine.

 

13.10Mine Map

 

Figure 16 shows a long section of the underground working illustrating the Final Mining Outline.

 

Figure 4 shows a plan view illustrating the Final Mining Outline and key surface infrastructure.

 

13.11Qualified Person’s Opinion on the Mining Method

 

The QP considers that the application of both longhole open stoping and Avoca stoping to the various lodes at CSA to be appropriate. Longhole open stoping with cemented paste fill is preferred in the deeper areas of the mine where geotechnical conditions can be more challenging. Lessons have been learned with stope orientation and ground control practices in recent years that are providing a beneficial input for the mine design, especially for the lower mine levels.

 

The QP notes that most of the Mineral Reserve is located in and around the existing mine environment, which should reduce both risk and cost, and take some pressure off mining exclusively in the lower levels of the mine.

 

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 83

 

 

 

 

Figure 16 END OF MINE LIFE - LONG SECTION
BDA - 0230-04-April 2024 Behre Dolbear Australia Pty Ltd

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 84

 

 

14 PROCESSING AND RECOVERY METHODS

 

14.1Introduction

 

The current CSA processing plant has been operating since 1967. It has operated well over the years and metallurgical performance has been very good with copper recovery to flotation concentrate recovery of around 97%-98%, producing concentrates averaging 26-27% Cu (Figure 17).

 

Design concentrator throughput is 1.4Mtpa, with design copper production of around 45-50ktpa plus approximately 450-520koz of contained silver in concentrate per year as a payable by-product (approximately 2-4% of revenue). Concentrator throughput is limited by ore availability linked to production capacity from underground. In recent years this has averaged around 1.1Mtpa to 1.3Mtpa. With improvements in mining area availability and location, the Reserve plan estimates production at 1.2-1.4Mtpa over the course of the Reserve life of mine. Mill production history 2018-2023 is shown in Table 14.1

 

Table 14.1

 

CSA Mill Production History 2018-2023

 

Description  Unit   2018   2019   2020   2021   2022   2023 
Ore Milled   kt    1,002    1,105    1,224    1,062    1,033    1,062 
Milled Grade   % Cu    4.57    4.01    3.84    3.90    3.68    3.48 
Contained Copper   kt    49.5    44.2    46.9    41.4    38.0    37.0 
Copper Concentrate Tonnes   kt    171.6    162.9    172.2    157.3    144.4    155.5 
Copper Concentrate Grade   % Cu    26.1    26.7    26.8    25.8    25.9    25.4 
Copper Recovery to Conc.   % Cu    97.6    98.4    98.2    97.9    98.0    97.8 
Cu Production   kt    44.8    43.5    46.2    40.5    37.3    36.1 
Ag Production   koz    459    462    516    459    446    429 

 

14.2Comminution

 

Primary Crushing

 

Underground ore is primary crushed underground to a nominal size passing 250mm using two 1,500mm (60 inch) by 1,200mm (48 inch) jaw crushers, located at the base of Shafts 1 and 2 (Levels 9 and 10). The crushed ore is hoisted to surface and conveyed to one of four 7,000t crushed ore bins on surface (Figure 17). Ore from these bins is conveyed via apron feeders to the SAG mills at the concentrator.

 

Concentrator Operations

 

The concentrator flowsheet (Figure 17) comprises:

 

·Two Metso 6.6m by 2.1m semi-autogenous grinding (SAG) mills with 1.6MW motors installed in 2022 and 2023, replacing two 900kW Hardinge Cascade SAG mills which had been operating for over 50-years. The Metso mills are used for primary grinding. The secondary ball mill is a Hardinge Cascade grinding mill, 6.6m by 2.1m, with a 1.1MW motor which was installed in the 1980s. The two SAG mills operate in either closed circuit or open circuit with the secondary ball mill operating in closed circuit. There is flexibility to arrange the three mills in different circuit configurations.

·The ground product from the SAG mills passes via a series of hydrocyclones to the ball mill, with the oversize returning to the SAG mills. The ground product from the ball mills also passes through a bank of hydrocyclones to provide a particle size distribution of 80% passing 106 micron (“P80=106µm”) which is sent to the copper flotation circuit; oversize material is returned to the ball mill.

·The flotation circuit has a number of circuit options, but effectively the circuit comprises rougher copper flotation followed by a scavenger recovery circuit. Scavenger concentrates are recycled to the rougher feed while rougher concentrates are fed to a cleaner circuit. The cleaner circuit is made up of cleaners followed by recleaners (Jameson cells). Cleaner tailings are returned to the scavenger circuit; scavenger tailings are discarded as final tailings. The recleaner concentrates are sent as final concentrates.

·Recleaner concentrates are first thickened and then filtered in two plate and frame filters. Final filter cake moisture is about 9.5%. The concentrates are stored two 12kt capacity concentrate storage sheds awaiting loading into containers and rail transport to the Port of Newcastle for export.

·Tailings underflow from the tailings thickener, is either pumped to the paste fill plant and sent underground to fill mining voids or pumped to the tailings storage facility (TSF).

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 85

 

 

 

 

Figure 17 PROCESS PLANT FLOWSHEET
BDA - 0230-04-April 2024 Behre Dolbear Australia Pty Ltd

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 86

 

 

The metallurgical performance of the CSA plant is very good. Copper recovery to concentrates from 2018 to 2023 averaged 98%. Recovery of silver, the only by-product, averages about 80%. Concentrate Cu grades average about 26.1% Cu and about 80g/t Ag.

 

Plant operating time during 2023 was quite variable and utilization was comparatively low; primarily related to ore feed supply from underground. Data for calendar year 2023 is summarized in Table 14.2.

 

Table 14.2

 

CSA Concentrator Performance January to December 2023

 

Item Units   Jan  Feb  Mar  Apr  May  Jun  Jul  Aug  Sep  Oct  Nov  Dec  Total 
Mill throughput t   90,673  62,635  87,389  80,316  78,339   95,727  117,600  101,302  81,426  79,844  91,032  95,229  1,061,513 
Availability %   96.5% 82.7% 95.7% 71.9% 50.5%  94.0% 95.8% 90.8% 96.6% 89.4% 97.8% 98.1% 89.2%
Utilization %   63.6% 59.4% 66.6% 61.0% 48.3%  89.0% 86.6% 75.3% 57.1% 53.4% 60.3% 56.4% 66.0%
Runtime hrs   1,573  1,270  1,687  1,520  1,391   1,711  2,011  1,817  1,440  1,415  1,466  1,517  18,818 
Plant throughput t/h   173  148  155  158  169   168  175  167  170  169  186  188  169 
Overall Utilization %   61% 49% 64% 44% 24%  84% 83% 68% 55% 48% 59% 55% 59%

 

 

CSA has completed the replacement of two Semi Autogenous Grinding (SAG) mills, which were around 50 years old, which has returned the grinding circuit overall utilization to 91-97% and further supports a processing capacity of 1.4Mtpa. At 8,000 plant operating hours (91.3%), the annual throughput capacity should be about 1.45Mtpa, though actual mill throughput is likely to remain constrained by underground mine production levels until new ore sources are developed.

 

In a report assessing CSA’s expansion potential, it was noted that there are possibilities for third party “toll treating” options for about 0.4Mtpa.

 

CSA has also reviewed water supply options to the mine. The current installed infrastructure is capable of supplying sufficient water to allow treatment of approximately 1.4Mtpa. The major source of water for the CSA operation is the Cobar Water Board supply, piped from Nyngan. This is supplemented by on-site catchments and bore water. The government has recently announced an upgrade of the Nyngan to Cobar pipeline and pump stations to increase capacity and reduce water losses.

 

The CSA operation experiences recruitment difficulties typical of remote sites. The site currently has critical maintenance positions open which it has been unable to fill for an extended period. A number of vacancies are being filled by technical service providers on contract.

 

14.3Concentrate Product

 

The copper concentrate produced by the CSA mine is high-quality and acceptable to off-take smelters. The concentrate grade averages about 26% Cu with payable silver at about 80g/t Ag. The concentrate contains no deleterious elements that would incur a penalty. The shipped concentrate has moisture levels of around 9.5%, which comply with the Transportable Moisture Limits for ocean freight. The particle size distribution for the shipped concentrates average 80% passing 62 micron (P80=62µm).

 

Concentrates from the processing plant are stored on-site in two large storage sheds located next to the rail siding and a loading station. Concentrate is loaded into special containers with removable covers and the containers loaded by front end loader (“FEL”) onto the train. Each train typically comprises 54 wagons carrying 108 containers containing approximately 2,900 wet metric tonnes (“wmt”) of concentrate. At Newcastle Port the containers are offloaded using a forklift and placed into a tippler and emptied into a bulk storage shed. Ships are loaded using a FEL, belt feeders and conveyors; each shipment is typically 10-12,000wmt.

 

14.4Tailings

 

Flotation tailings are either sent to the Paste Fill plant or the final tailings thickener depending on mining backfill requirements. The Paste Fill Plant takes the full stream tailings and partially separates the water through vacuum filters to produce filter cake. The filter cake is mixed with cement and sent underground as paste fill. Waste rock is included in the cemented fill when available.

 

Tailings product is thickened using a high-rate thickener before being pumped to the storage facility for deposition.

 

The CSA Mine deposits thickened tailings within the South Tailings Storage Facility which is a licenced discharge point for the CSA Mine.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 87

 

 

Although variable based on production sequencing, approximately 45% of the tailings is sent to the paste fill plant and ends up as backfill with the remaining 55% of the tailings deposited in the Southern Tailings Storage Facility.

 

For additional information on CSA’s Tailings Storage Facility, reference should be made to Section 15.5 and Section 17.6.

 

14.5Other Processing Inputs

 

Consumables

 

Due to the high-grade ore at CSA, the processing facility is not required to process a large volume of ore to extract the copper, compared with many other copper mines in the industry. As a result of its comparatively small size and efficient ore recovery performance, the plant requirement for consumables such as grinding media, wear components or reagents is relatively modest.

 

The main consumables used in the processing operations are grinding media and mill liners which, combined, represent a cost of approximately US$3-4M per annum. These consumables represent approximately 18% of total processing costs and 3% of total mine site costs each year.

 

Personnel

 

Approximately 100 employees work across the fixed plant areas of CSA including the concentrator, concentrate handling and paste fill plant. The consistency of processing operations has led to greater stability in the workforce, relative to the mining operations, and workforce numbers are expected to remain at similar levels for the Reserve life. Labour costs represent approximately 40% of annual Processing costs, with Contractors contributing a further 22%.

 

Energy and Utilities

 

The third major processing cost component is power and utilities. As with process plant consumables, the high-grade ore at CSA enables copper concentrate to be processed using a relatively low total grinding mill power per tonne of copper produced. Power costs for the process plant average approximately US$3-4M per year, which represents 16% of total milling costs.

 

Due to the high availability and near-continuous operation of the grinding mills during operation, annual power demand is generally extremely consistent and not expected to vary throughout the Reserve life of mine. Variances in power consumption may occur on a short-term basis during maintenance outages or when ore supply from underground is not available.

 

Processing facilities require large volumes of water throughout most stages of the processing pathway; however much of the process water is recovered and reused, significantly reducing the amount of fresh water required.

 

Water loss in the process plant is predominantly through entrained water/moisture leaving the plant within concentrate product (~9.5% moisture content per tonne of concentrate) or tailings (~70% water content per tonne of tailings). Water from the tailings is recovered through a decant system at the tailings storage facility or through the filtration process within the paste fill plant.

 

Water consumption within the process plant is well understood, stable and not expected to vary over the Reserve life of mine. Power and water costs combined represent approximately 18% of annual processing costs.

 

14.6Qualified Person’s Opinion on Processing and Recovery Methods

 

The QP is satisfied that the processing facilities at the CSA mine are in good order and fit for purpose. Operating performance has been good and consistent and the QP expects this to continue.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 88

 

 

15Infrastructure

 

15.1Access and Ports

 

Roads

 

Road access to the mine site from Sydney is via National Highway No. A32, the Barrier Highway, a high-quality rural highway to Cobar and from there to the mine site on sealed urban roads (Figure 1).

 

Airstrip

 

Cobar is serviced by a sealed airstrip with commercial flights five times per week to and from Sydney.

 

Rail

 

The site is serviced by a rail line (Figure 1) which allows transport of concentrate product to the Port of Newcastle for export. Concentrate is loaded into rail wagons at the site and railed to Newcastle along the NSW rail network. Railing to Port Kembla, south of Wollongong, is also an option.

 

Port Facilities

 

Concentrate product is unloaded from rail wagons and stored at the Port of Newcastle before being loaded onto ships for export. The port facilities are owned and operated by a private company, Port of Newcastle Operations Ltd, with the unloading, storage and ship-loading services being provided to the project in accordance with a services contract.

 

15.2Ventilation Infrastructure

 

The ventilation system is based on four primary exhaust fans. The surface fans can extract a volumetric flow rate of 1,000m3 per second (“m3/s”) of air out of the mine via a dedicated series of ventilation raises from the bottom of the mine to surface.

 

No. 1 Shaft, No. 2 Shaft, Fresh Air Raise 1 (“FAR1”), Fresh Air Rise 2 (“FAR2”) and the main decline from the surface are the primary fresh air intakes. The No. 2 Shaft accounts for about 20% of the total mine fresh air, FAR1 33%, FAR2 28%, No. 1 Shaft 17% and the decline 2%.

 

Underground auxiliary fans force-ventilate working areas with fresh air from a series of dedicated fresh air raises connected directly to the cooling plants atop FAR1 and FAR2.

 

The mine’s geothermal gradient is 2ºC per 100m; the air is chilled by surface refrigeration plants at No. 2 shaft, No. 1 Shaft, FAR1 and FAR2 (3.5MW, 2MW, 10MW and 12MW respectively), down to 4-8ºC wet bulb (“WB”) to target a 24ºC WB fresh air temperature at 8430RL. With the current ventilation system, WB temperatures in the working areas of 8430RL are up to 27°C WB, which is considered to be within industry safe working limits.

 

As mining gets deeper, sustained production will depend on developing sufficient mining fronts, and the associated level ventilation, to support the production output. QTSN remains the primary production area though as development in 2020 and 2021 was behind target, delays in establishing new mining levels occurred and catch-up has been the focus over 2023 and 2024. Decline advance rates at depth and ventilation improvements are an ongoing focus for the operations team. Production is supplemented from QTSC and Western stopes. The ventilation and cooling demands are driven by the increase in mining depth, number of mining areas and the increasing mining fleet required to support the targeted production.

 

Ventilation Upgrade Projects

 

CMPL initiated an assessment of the primary ventilation and cooling systems in late 2017, with a feasibility study launched in 2018 to establish LOM ventilation and refrigeration requirements. CMPL completed this study in October 2018. The Ventilation and Refrigeration Upgrade Project aims to enable CSA to achieve and sustain a 1.2-1.4Mtpa production rate, with inclusion of mining areas in QTSC, to a potential depth of 2,200mbs (exceeding the maximum mining depth of 1,980mbs planned in the current Mineral Reserve life of mine). The upgrade project comprised two stages: Stage 1 primary vent fan installation and refrigeration upgrades were completed in 2023.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 89

 

 

Stage 1 is summarized below:

 

·increased primary airflow from 700m3/s to 1,000m3/s

 

·replaced the existing four primary surface exhaust fans located over two RARs from 4 x 1.35 megawatt equivalent (“MWE”) to 4 x 2.7MWE.

 

·constructed a new intake raise system (FAR2)

 

·expanded the refrigeration plant capacity to double fixed-plant cooling capacity from 8 megawatt bulk air cooling (“MWBAC”) to 16MWBAC, new plant uses R134a coolant which is a more efficient coolant that previous version

 

·relocated two bulk air coolers from No.2 Shaft to No.1 Shaft

 

·continue existing surface and underground rented cooling infrastructure of 10MWBAC

 

·achieve total 26.5MWBAC cooling capacity.

 

With Stage 1 now complete, the next ventilation upgrade project, Stage 2, is centred around reducing the resistance of the return air system in the lower areas of the mine, improving airflow across the production levels.

 

Stage 2 proposes the development of staged, twin 3.5m return air raises from approximately 9100RL (~1,200mbs) to 8290RL (~2,0000mbs). These raises will reduce airflow resistance experienced by the inter-level return air system, which is established as part of mine level development. Stage 2 of the ventilation upgrade will be constructed from 2024 through to 2027 and will achieve the ventilation requirements to deliver the Reserve life of the mine plan.

 

The proposed return air system will employ a considerable standoff distance from the QTSN orebody, to ensure the raises are placed in areas of suitable rock quality. The design rationale for the proposed return air strategy is considered to be an improved approach when compared to previous raise designs at CSA.

 

Stage 3 of the ventilation upgrade project is considered optional at this stage as it is primarily focused on the reduction of operational expenditure, through the replacement of the current hire cooling infrastructure on fresh air raise 1 (FAR1) with a permanent 12MWbac cooling system. This stage would also consider the installation of intake fans on FAR 1 and FAR 2, to force the chilled airflow down these raises and further lower operating temperatures should it be required.

 

As underground ventilation requirements are predominantly driven by the number of diesel-powered mobile equipment units operating, an increased incorporation of battery/electric vehicles into the operation should have a positive impact on ventilation requirements in the future.

 

15.3Power Supply

 

Power supply to the site is via a 132kV transmission line from Essential Energy’s western NSW network. The Essential Energy network is supplied by a mix of conventional and renewable power generation, including the 102MW and 132MW solar farms in the nearby towns of Nyngan and Nevertire. The current available capacity of the supply facilities is around 26 mega volt amperes (“MVA”). The average power demand is around 36MVA following the completion of the ventilation upgrade project. A new 40MVA transformer has been installed to handle the demand. A 22kV line is also connected to the site from Cobar and is available for limited supply in emergencies.

 

15.4Water Supply and Water Pipelines

 

The majority of water supply for the operation is provided by the Cobar Water Board from a weir on the Bogan River at Nyngan (Figure 1) through a network of pumps and pipelines. Additional water is available from tailings water recycling, surface water capture and a borefield installed in 2019. Water demand is around 3 megalitres per day (ML/day) in summer, with most water supplied by the Cobar Water Board system. The borefield has capacity for up to 1.3ML/day, although CMPL advises that the water quality is poor and requires treatment, incurring additional cost, before use in the process plant. The Cobar Water Board system is adequate to supply the operation up to around 1.4Mtpa; the borefield is only required during periods of drought or should a plant feed rate in excess of 1.4Mtpa be consider for extended periods.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 90

 

 

15.5Tailings Storage Facility

 

CSA mine currently operates one tailings storage facility, the South Tailings Storage Facility (STSF) (Figure 4), comprising the main STSF (approximately 63ha) and the STSF Extension (19ha). The main STSF operated until January 2007, at which time the facility had been filled to its freeboard-related capacity. In January 2007, the newly constructed STSF Extension was commissioned and received thickened tailings from the ore processing plant until September 2010. A 3m embankment raise was constructed on the surface of the STSF in 2010, with deposition then reverting back to this facility. The STSF was upgraded to alter the deposition method to a central depositional system. This method provides substantial water savings and will result in a final landform more amenable to rehabilitation. There will also be a reduction in the requirement for suitable material for tailings dam wall lifts and final capping; final topsoil requirements for rehabilitation will be lower than with the old multi-spigot perimeter depositional method and there will be an increase in tailings dam integrity as the resultant solids will contain less moisture.

 

The 2010 wall lift reached its capacity in September 2019. CSA constructed a perimeter embankment through a further wall lift (Stage 9) which increased deposition capacity through to February 2025. Two further perimeter embankment raises are scheduled and are expected to provide enough capacity through until 2032, after which a new facility will be developed. Tailings from the process plant flotation circuit are either sent to the paste fill plant or thickened in a high-rate thickener and sent to the STSF. Supernatant water is collected in a dedicated decant dam for recycling to the process plant circuit.

 

The STSF is well operated with no significant issues in relation to the facility’s integrity. A tailings storage facility stability assessment conducted by Golder Associates Pty Ltd has indicated some sections of the dam where the Factors of Safety (FOS) were below the target for Post Seismic (Liquified Strength). However, the Static FOS (Undrained Strength) remains within target for these areas. CSA is approaching the finalization of buttressing enhancements at designated positions along the STSF perimeter embankment. This initiative is aimed at achieving compliance with the Factor of Safety (FOS) criteria under Post-Seismic (Liquefied Strength) conditions.

 

The North Tailings Storage Facility (NTSF) (132.9ha) which lies adjacent to the northern boundary of the STSF, has been decommissioned and has been excised from the CSA Mine Lease (CML5); NTSF is owned by, and is the responsibility of, the New South Wales government. Initial discussions between the Company and the applicable government agencies have indicated that the government would support reclamation of the NTSF, should the Company decide that the NTSF was the preferred long-term tailings storage solution.

 

At present, there are no additional tailings storage area options with planning approval, other than STSF Stages 10 and 11. BDA understands that CMPL has commenced preliminary work on potential additional TSF storage areas, including consideration of the currently excised NSTF which may offer an opportunity for further tailings storage.

 

Tailings Storage Facility Design Standards

 

Regulatory standards that currently apply to the STSF are Dam Safety NSW, Australian National Committee on Large Dams (ANCOLD) and the Glencore Protocol 14. Protocol 14 covers both dam safety and environmental aspects of the STSF with a consequence category assessment method based on the Canadian Dam Association (“CDA”) standards.

 

Based on Dam Safety NSW, ANCOLD and Glencore Protocol 14, the consequence category assigned to the STSF is ‘Significant’. In 2019, Dam Safety NSW updated its Dam Safety Regulation and methodologies, which require all ‘declared dams’ in New South Wales to adhere to the new regulations by 1 November 2021. The STSF is a ‘declared dam’ (Dam ID 497) and regulated by Dam Safety NSW.

 

In summary, the tailings management strategy adopted by CMPL is appropriate, and the design standards used incorporate a risk-based approach as required by local standards.

 

15.6Workforce Accommodation

 

The majority of the workforce is accommodated in Cobar with some senior staff employed on a fly in/fly out (FIFO) or drive in/drive out (DIDO) arrangement. No workforce accommodation is provided at the mine site itself, however, the Company owns and leases various properties in Cobar.

 

15.7Site Buildings and Services

 

Site buildings comprise site offices, warehouses, and services buildings. Site services include power and water reticulation facilities, communications systems and fuel storage and dispensing facilities.

 

15.8Qualified Person’s Opinion on Infrastructure

 

The CSA mine is well established with all infrastructure and services in place to sustain the current level of operation for the remainder of the Reserve mine life. Further lifts of the STSF are required and planning for these are well in train.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 91

 

 

16Market Studies

 

This section contains forward-looking information related to commodity demand and prices for the Project. The material factors that could cause actual results to differ materially from the conclusions, estimates, designs, forecasts or projections in the forward-looking information include any significant differences from one or more of the material factors or assumptions that are set forth in this section including prevailing economic conditions, commodity demand and prices as forecast over the reserve mine life period.

 

Copper Outlook Reports dated Q3 2023 published by global research and consultancy group Wood Mackenzie and general market intelligence are the source of the copper market information provided in this section.

 

16.1Copper Demand

 

Demand for copper has been growing rapidly in the 21st century, as copper is relied upon by many industries for its high conductivity, malleability, corrosion resistance, and antimicrobial nature. Global refined and total copper consumption is forecast to grow at a compound annual growth rate (CAGR) of 2.1% and 2.6% respectively between 2023 and 2033, with refined copper demand having already grown from 19.6Mt in 2012 to 25.2Mt in 2022. Current end market uses for copper in 2022 included:

 

·building/construction - 27%

 

·electrical network infrastructure - 28%

 

·industrial machinery and equipment - 11%

 

·transportation equipment -12%

 

·consumer and general products - 22%.

 

Total historical and forecast copper consumption by industry sector are depicted in Figure 18.

 

Figure 18

 

Total Copper Consumption by Industry Sector (2000-2050)

 

 

 

Source: Wood Mackenzie, Global Copper Investment Horizon Outlook, Q3 2023.

 

Three trends are expected to underpin the long-term growth trajectory and demand for copper: decarbonisation, industrialisation and regional migration, and an increase in the use of scrap relative to cathode.

 

As decarbonisation trends remain strong and the energy transition accelerates, copper’s key electrical conductivity properties, which are difficult to substitute, make it key to a low carbon world. It is evident that increased demand for electric vehicles and low carbon energy sources have already started fuelling a rise in the demand for copper. Electric vehicles and renewables (solar, offshore, and onshore wind), require motors, transformers and cabling that have higher copper intensities than were previously required in standard motor vehicles and non-renewable energy sources. Battery electric vehicles are estimated to require ~3.6 times the amount of copper used in internal combustion engine cars, with a 3MW wind turbine requiring up to ~4.7t of copper.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 92

 

 

Adoption of electric vehicles (both commercial and passenger) is growing rapidly and is projected to increase by 239% from 2022 to 2030. Demand is being underpinned by government carbon target policies, such as the European Parliament’s recently approved law (14th of February 2023) to phase out the purchase of combustion vehicles from 2035. Similarly global carbon target policies are fuelling the development and uptake of renewables, with network infrastructure upgrades required to incorporate these copper intensive power sources into the grid.

 

Industrialization and urbanization in developing countries will be another driving force behind future copper consumption (Figure 19). Since 2000, China’s rapid development and large investment in infrastructure and other forms of construction, together with its emergence as the pre-eminent manufacturing hub, have made it the most significant contributor to industrial and construction-based copper demand (9.2% CAGR over the 2000 – 2022 period). From 2022 to 2050, Asia (excluding China) is expected to outpace Chinese demand and underpin copper demand growth as Chinese industrialisation and urbanisation trends ease. Total copper demand in Asia (excluding China) is predicted to experience a CAGR of 4.7% between 2022 to 2050, stemming from industrial migration and domestic industrial policies that promote end-use manufacturing. Copper can be re-used indefinitely on its own or in alloys, without any loss in quality. Because of this a significant percentage of copper demand relates to recycled copper, otherwise known as scrap copper. Scrap as a share of total copper demand was ~32% (10.2Mt) of total copper in 2022. Scrap will be a key raw material to meet future demand and is expected to rise to just over ~39% (16.3Mt) of total copper market demand by 2033 mainly due to the commissioning of electrodeposited copper foil plants.

 

Figure 19

 

Regional Refined Copper Consumption 2000-2050

 

 

 

Source: Wood Mackenzie, Global Copper Investment Horizon Outlook, Q3 2023.

 

16.2Copper Supply

 

Most large-scale copper operations are concentrated in four copper belts around the world: the Andean, Central African, East Australian and Southwestern (North American) copper belts (Figure 20). Global production is diversified across a large number of mines, however the world’s top eight copper (copper in concentrate and leach) producing countries contributed ~78% of the world’s supply in 2022. Copper production by mine and company is more dispersed, however still concentrated, with the top ten mines and companies accounting for ~24% and ~42% respectively, of copper production in 2022.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 93

 

 

Figure 20

 

Mined Copper Production by Country 2022 (kt Cu)

 

 

 

Source: Wood Mackenzie, Global Copper Investment Horizon Outlook, Q3 2023.

 

The lifespan of global copper reserves, which includes replaced reserves, has remained steady over the last two decades and is equivalent to a remaining production lifespan of 35 years. Chile, Peru, Mexico and the United States hold approximately half of the world’s copper reserves, with Australia accounting for 6% (Figure 21). Based on Wood Mackenzie predictions, current reserves are sufficient to fulfil required mine production for the next 20 years without reserve replacement. Meeting primary demand beyond this will require the discovery of new reserves and/or conversion from identified resources.

 

Figure 21

 

Global Distribution of Currently Identified Reserves and Resources

 

 

 

Source: Wood Mackenzie Data, October 2023.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 94

 

 

Chile is the largest copper producer globally and is responsible for ~60% of copper production in the Latin America and Caribbean region. Chile produced 5.4Mt of copper in 2022 and is expected to produce 6.1Mt in 2025 (expected output before unforecastable site specific losses/gains or site specific market-related adjustments). More than 36 active mining operations are present in Chile, with most mines located along the Andean Copper Belt.

 

Copper Supply in Australia

 

As depicted in Figure 20, Australia was the world’s 8th largest producer of copper, producing 0.83Mt (in contained copper metal terms) in 2022. By 2033, Wood Mackenzie’s base case predicts that Australian copper production will fall to 0.53Mt, as only four Australian mines are expected to be producing beyond 2040 and only a few major uncommitted projects are anticipated to be in the pipeline. Copper accounted for 2.1% of Australia’s export revenue in 2022.

 

Almost all copper production in Australia is in four regions – South Australia, Queensland, New South Wales and Western Australia (Figure 22). Production from BHP’s Prominent Hill and Olympic Dam (Prominent Hill previously owned by Oz Minerals) contributed to South Australia producing ~38% of all copper in Australia in 2022. Production from Newcrest’s Cadia Hill and MAC’s CSA Copper Mine contributed to New South Wales production which accounted for ~23% of total Australian production. Queensland accounted for ~22% of Australian copper output, with Glencore-owned Mount Isa accounting for a significant percentage of Queensland’s copper production. Sandfire-owned DeGrussa and Newcrest-owned Telfer (now owned by Newmont) contributed to remaining production in Western Australia, with Tasmania also producing minimal amounts of copper. Other than Olympic Dam and Mount Isa, Australian copper mines produced copper concentrate mostly exported for smelting in China, Japan, and India.

 

Figure 22

 

Copper Mining in Australia

 

 

 

Source: Wood Mackenzie, Global Copper Investment Horizon Outlook, Q3 2023.

 

Out of a total of 62 regions, New South Wales ranked #23 on the Fraser Surveys most attractive regions for mining investment in 2022. Australia’s stable political regime, access to high-quality infrastructure and experienced mining workforce make it an attractive jurisdiction for copper mining.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 95

 

 

MAC competes with a range of global mining firms in the marketing and sale of its mineral concentrate products (including copper and high precious metals concentrates). As part of MAC’s binding sale and purchase agreement with Glencore, MAC has entered into an agreement to sell all concentrate product from the CSA mine to Glencore International AG (GIAG). This Offtake Agreement commits 100% of the produced concentrate for the life of mine to GIAG, as the sole customer. The offtake terms are referenced to the annual Benchmark terms set by the industry and published annually.

 

16.3Copper Supply Outlook

 

Overview

 

Since the 20th century, copper production rates have grown in response to increasing consumer demand. Refined copper supply has grown from 14.8Mt in 2000 to 25.4Mt in 2022 at an average annual growth rate of ~2.5%.

 

Based on the production capabilities of existing and probable copper mines (assuming 70% brownfields probable projects plus 20% mine-life extensions), Wood Mackenzie forecasts that supply will be able to meet demand requirements for the next ~3 years, until the end of 2026 (Figure 23). By 2027, a theoretical supply gap will emerge, growing to ~5.0Mt by 2033 after factoring in the contribution of copper scrap. To meet this supply gap, it is forecast that new projects must be brought online at a rate of ~700ktpa; however, this is below the 2018 to 2021 average. The capital investment needed to deliver the new projects required to bridge the supply gap would need to match the peak level of investment seen historically, being approximately US$120 billion (A$183 billion) over the next ten years.

 

The adoption of new emergent technologies, including coarse particle recovery, sulphide leaching, and process optimization with machine learning have been deemed to have the potential to close a significant portion of the supply gap, reducing the need for such high levels of capital investment in new mines. The obstacles to commercialization and widespread adoption of these new technologies are not trivial, and technological levers would need to be recognised alongside new mine development as part of the solution.

 

Figure 23

 

Emerging Supply Gap from Global Copper Production and Primary Demand

 

 

 

Source: Wood Mackenzie, Global Copper Investment Horizon Outlook, Q3 2023.

 

Copper Supply Challenges and Outlook

 

An array of factors makes the development of new copper mines increasingly challenging, including, but not limited to, declining head grades, slow project ramp up, political and fiscal instability, resource nationalism, community and social conflict, environmental opposition and permitting delays, as well as technical and financial risks. Head grades, slow project ramp up and technical issues account for a significant portion of mine disruptions. However, it is expected that the other issues listed above will present the greatest challenges for future development.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 96

 

 

16.4Copper Price Outlook

 

The price of copper is largely influenced by the health of the global economy and the expected future balance of worldwide copper supply and demand. Copper is traded internationally with its price determined by the major commodity exchanges which include the LME, COMEX and SHFE.

 

Copper prices reached an all-time high in March 2022 trading above US$10,730/t (~132% increase from 2020 lows), due to COVID-19 lockdowns restricting the availability of copper, the Ukraine/Russian war fuelling further supply deficit fears and an increased focus on future facing metals.

 

Broker consensus prices as at 8 August 2023, comprising over 25 contributing analysts, indicates forecast copper prices to rise from US$8,584/t in August 2023 to a peak of US$9,372/t in 2026, as the market moves into a period of high demand. From 2026 onward, consensus forecasts assume a long-term average of US$8,279/t (US$3.76/lb).

 

16.5Silver Demand

 

Historically silver has been used in jewellery, fine art, and tableware, with the metal’s industrial uses expanding in modern times to include batteries, LED chips, and semi-conductors. Silver demand increased by ~18% from 2021 to 2022 to 1.24Boz despite declines in photographic and brazing alloys demand (Figure 24). Increases were driven largely by industrial demand, which was supported by electrification within the automotive segment and other power generation and distribution investments. Alongside increases in industrial uses that support the global energy transition, rises in vehicle output, 5G network investments, and growth in the construction industry also supported increased industrial demand.

 

Figure 24

 

Silver Demand

 

 

 

Source: The Silver Institute, Silver Supply & Demand, 2023

 

16.6Silver Supply

 

In 2022, ~82% of silver supply came from mine production with the remaining ~18% coming from recycled scrap metals (Figure 25). In 2022, 72% of mined silver production was produced from projects where silver was a by-product of the mining of other metals, due to there being few mines around the world in which silver is the main or only commodity produced. As outlined by the Silver Institute, a large silver supply deficit is emerging, with the global silver market undersupplied by ~238Moz in 2022. The Silver Institute expects that supply deficits will be ongoing.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 97

 

 

Figure 25

 

Silver Supply

 

 

 

Source: The Silver Institute, Silver Supply & Demand, 2023

 

16.7Silver Price Outlook

 

As silver is an internationally traded commodity, its price is determined by major commodity exchanges, including COMEX and SHFE. The spot silver settlement price averaged US$22.65/oz in 2022 and has averaged US$23.33/oz in 2023. The gold-silver ratio has historically been tracked when following the silver price, given gold and silver prices rarely deviate from one another due to their well-established correlation. Due to silver’s large and increasing industrial uses, the silver price also benefits when industrial metals rally, with the strength in the price in 2023 being driven by positive industrial fundamentals, and supply shortages which are likely to be sustained going forward.

 

Broker consensus prices as at 8 August 2023, indicates forecast silver prices holding relatively steady around US$23.60/oz in August 2023 through 2025. From 2025 onward, consensus forecasts assume a reduction to a long-term average of US$22.60/oz.

 

16.8Commercial Contracts

 

As part of MAC’s binding sale and purchase agreement with GIAG, MAC has entered into an agreement to sell all concentrate product from the CSA mine to GIAG (the “Offtake Agreement”). The Offtake Agreement for the CSA mine commits 100% of the produced concentrate for the life of mine to GIAG, as the sole customer. The offtake terms are referenced to the annual Benchmark terms set by the industry and published annually and are therefore considered market competitive. The offtake contains market standard clauses for payables, deductions and penalties for deleterious elements.

 

The Offtake Agreement contains market standard clauses for payables, deductions and penalties for deleterious elements as well as customary terms and conditions, including in relation to (i) quantity, (ii) quality, (iii) shipment and delivery terms, (iv) pricing, (v) payments, (vi) weighting and sampling, (vii) assaying, (viii) Incoterms and insurance, (ix) loss, and (x) force majeure.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 98

 

 

16.9Product Specifications Requirements

 

The principal product specification requirements copper concentrates are that the concentrate should be free from radioactivity and deleterious impurities harmful to smelting and/or refining processes. The CSA Mine concentrates are considered to be high-quality containing low levels of deleterious elements and are sought-after for blending purposes.

 

The typical rejection levels for copper concentrate into China are as follows:

 

·Pb >6%

 

·As > 0.5%

 

·Fl > 0.1%

 

·Cd >0.05%

 

·Hg >0.01%

 

The CSA Mine concentrates are well below these levels.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 99

 

 

17Environmental Studies, Permitting and Plans

 

17.1Introduction

 

The Cobar area has been impacted by mining and agricultural activities since the 1880s. The existing landscape surrounding the CSA mine is characterized by mining infrastructure, tailings storage facilities, shafts, disturbed grasslands and soil and rock stockpiles. The native vegetation of the area has been impacted by clearing and overgrazing with the historic removal of much of the native vegetation resulting in erosion and extensive colonization by invasive species. This has created a dense regrowth, referred to as ‘woody weeds’ or Invasive Native Species. The landscape has become highly modified and vulnerable to wind and water erosion, particularly those areas devoid of vegetation ground cover protection. The region surrounding the CSA mine is dominated by rangeland agriculture.

 

Conditions for reopening the mine in 1999 included concessions obtained from the New South Wales government, including the excision of three areas from the Mining Lease: the North Tailings Storage Facility (NTSF), an area of subsidence and adjacent waste rock dumps.

 

The CSA mine is located in an area of low undulating NNW trending rises and is associated with a broad, prominent hill, Elouera Hill, which rises approximately 30m above the surrounding landscape. The mine lies close to the local drainage divide between the catchments of Sandy Creek in the southwest and Yanda Creek to the northeast.

 

The climate of Cobar is semi-arid with evaporation typically exceeding rainfall by a ratio of 6:1. The mean annual rainfall for Cobar is approximately 400mm. During summer months, maximum temperatures typically range between 28-39ºC and during the winter months, maximum temperatures typically range between 13-20ºC. Rainfall and temperature records have been recorded from May 1962 and evaporation from November 1967.

 

The CSA mine is located in a non-environmentally sensitive Area of State Significance; as such, mining activities are subject to Part 4 of the Environmental Planning and Assessment Act 1979. However, because CMPL’s Development Consent was granted in 1995 before the State Environmental Planning Policy (State and Regional Development) 2011 came into force, its activities are classified as Non-State Significant Development based on the prior existing consent. The Cobar Shire Council is the approval authority for the site development approvals.

 

17.2Baseline and Supporting Studies - Environmental Management and Reporting System

 

CSA mine operates under a documented Environmental Management System (EMS) that forms the basis of environmental management at CSA and includes procedures, standards and environmental management plans (EMPs) to ensure all regulatory requirements are met.

 

Statutory condition (R1.1) of CMPL’s environmental licence (EPL1864) requires it to submit annual statements of compliance for its Environmental Management System and practices. CMPL submits an Annual Return comprising a Statement of Compliance and a Monitoring and Complaints Summary to the NSW EPA in August each year. An Annual Report is compiled for the mine to fulfil the reporting requirements of the NSW Mining Act 1992.

 

For completeness, as CSA has been an operating mine for the past 56 years, no ongoing baseline studies are required for normal mining operations under CML5. CSA does however conduct scheduled environmental monitoring and undertakes heritage surveys when seeking approval for works outside the already approved operating areas. The CSA environmental team, along with independent consultants, have extensive experience in conducting appropriate studies and ensuring compliance with state and federal regulations.

 

17.3Permitting

 

The CSA Mine operates under a number of different approvals, including:

 

·Development Consents issued by Cobar Shire Council (CSC)
·Landowner’s Consent issued by NSW Department of Planning, Industry and Environment-Lands
·Mining tenements issued by the NSW Department of Planning, Industry and Environment – under Housing and Property
·Rehabilitation Management Plan (RMP) authorized by the NSW Resources Regulator
·EPL1864 issued by the Environmental Protection Authority (EPA)
·Water licenses issued by the NSW Office of Water (NoW)
·Dangerous Goods licenses issued by WorkCover NSW.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 100

 

 

17.4Rehabilitation Management Plan (RMP)

 

Environmental aspects of mineral exploration and mining (including mine rehabilitation and closure) in New South Wales are administered under the NSW Mining Act 1992.

 

The recent introduction of the Mining Amendment (Standard Conditions of Mining Leases – Rehabilitation) Regulation 2021, requires large mines to have a Rehabilitation Management Plan (RMP). CSA Mine has completed an RMP and has had its Rehabilitation Objectives Statement approved by the NSW Resources Regulator. CSA, as the lease holder, will provide annual reporting and scheduling of rehabilitation via an Annual Report and Forward Program (three-year period). This has replaced the previous requirement for an Annual Environmental Management Report (AEMR).

 

17.5Mine Waste Management

 

Waste rock from underground development is backfilled into mined out stopes where possible, but any excess is hoisted or trucked to surface for storage on temporary waste stockpiles for use in tailings facility construction projects or for end of mine life rehabilitation. Most waste rock is classified as Non-Acid Forming (NAF) but around 30% of the waste material is classified as Potential Acid Forming (PAF) rock.

 

All waste rock materials are geochemically tested for issues related to acid rock drainage (ARD) and potential for metal leaching. Only suitable, low risk waste rock material is hoisted and stockpiled on the surface. Any geochemically unsuitable materials are integrated into the underground mining activities. The selection of appropriate ARD controls depends on several factors including the type and severity of expected environmental impacts and the opportunities available. Waste rock material is included in cemented rock fill (CRF) when available or backfilled into stopes to be filled with cemented paste fill (CPF).

 

Figure 16 show the final mining outline as a long section of the underground mine infrastructure and ore depletion at the end of the current Mineral Reserve life in 11 years’ time.

 

17.6Tailings Disposal

 

The CSA Mine deposits thickened tailings within the South Tailings Storage Facility which is a licenced discharge point for the CSA Mine as approved in EPL1684.

 

The tailings deposited are monitored monthly and the dam is surveyed quarterly. Annual surveillance audits are conducted by qualified external dam engineers (Engineer of Record). Approximately 45% of the treated ore ends up as backfill and 55% of the treated ore ends up as final tailings deposited in the STSF.

 

Flotation tailings are either sent to the Paste Fill plant or the final tailings thickener depending on mining backfill requirements. The Paste Fill Plant takes the full stream tailings and partially separates the water through vacuum filters to produce filter cake. The filter cake is mixed with cement and sent underground as paste fill. Waste rock is included in the cemented fill when available.

 

To monitor operational freeboard within the STSF and ensure there is always sufficient capacity, quarterly surveys are conducted to track the available freeboard remaining within the dam. The results of these surveys are communicated back to the tailings engineers to allow for performance to be tracked and to initiate approvals and construction activities, should the surveys identify the STSF is reaching the end of its projected life sooner than scheduled.

 

Global engineering firm Golders Associates/WSP is engaged by CSA as the Engineer of Record for tailings monitoring, engineering and design activities.

 

17.7Water Management

 

CMPL operates CSA Mine in accordance with the conditions stipulated in Environmental Protection License (EPL) 1864. No detailed requirements are made of CMPL regarding water management. Specifically, EPL1814 states that no water pollution may occur, and licensed activities including the processing, handling, movement and storage of materials and substances used to carry out the activity; and the treatment, storage, processing, reprocessing, transport and disposal of waste generated by the activity, must be carried out in a competent manner. Further, all plant and equipment installed at the premises or used in connection with the licensed activity must be maintained in a proper and efficient condition and operated in a proper and efficient manner.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 101

 

 

In lieu of site-specific water management conditions, CMPL has adopted the following principles stipulated in Australia’s Department of Industry, Innovation and Science Water Stewardship handbook:

 

·prevent discharges of dirty water

 

·reduce the importation of water from external water sources

 

·minimize the occurrence of water losses through evaporation and seepage and maximize water use efficiency

 

·maximize water recycling and reuse on site, separate water streams where practicable and minimize disturbance to existing drainage pathways.

 

Water Balance

 

CMPL maintains a water balance model to be used in reporting and as a forecasting tool. The water balance model is informed by the collection of regular water transfer meter readings. By correlating data obtained from these readings with outputs from specific plant, a relationship between water usage and mining and ore processing parameters can be established and future water requirements more accurately estimated. Currently, reticulation volumes are measured with mechanical flow meters located at inflows and outflows of interest. The water balance model is continuously reviewed to ensure that it captures any modifications to water distribution. Water consumption and basic reticulation data are reported internally in monthly operational reports.

 

Recycling and Water Saving Measures

 

An extensive water recycling program is employed at CSA Mine to supplement process water requirements. Concentrate and tailings filtration, underground dewatering, and TSF decant have historically returned in excess of 250ML of water annually. All recycled water is transferred to the settling ponds for basic suspension treatment to reduce suspended solids before being pumped to Pork Pie dam. Recirculation of process water has been demonstrated by CSA metallurgists to be of no determinable detriment to ore processing performance indicators and may therefore be recycled indefinitely. The volume of water recycled through the ore processing and backfill circuit is expected to increase as paste continues to replace CHF as the primary means of underground void backfilling. Short term monitoring of water reticulation at the Paste Fill Plant has indicated that approximately 300kL may be returned daily.

 

All CSA employees and contractors are informed of the scarcity and importance of water as a resource in the site induction. All personnel on site are responsible for partaking in water conservation practices and reporting incidents of excess water usage through the internal hazard reporting system.

 

Surface Water Monitoring

 

CSA undertakes routine surface water monitoring to demonstrate compliance with the conditions of EPL1864 and to provide data to assess the efficacy of site water management practices. Surface water bodies in CML5 do not extend into adjacent land parcels and do not supply a purpose outside of the mining and milling activities at CSA. As CSA does not discharge contaminated water offsite, a number of surface water bodies serve as contaminated water receptacles. The nearest neighbouring water bodies are Yanda Creek 15km east of the TSF, and Buckwaroon Creek 40km south-west of CML5. Both of these water bodies are ephemeral in nature.

 

Surface water sampling is conducted as per the principles enunciated in the Standards Association of Australia AS/NZS 5667:1:1998. In lieu of baseline data or a reference water body, monitoring analytes are compared against the short-term trigger values for general water use stipulated in the Australian and New Zealand Environment and Conservation Council (ANZECC) Guidelines for Fresh and Marine Water Quality.

 

Ground Water Monitoring

 

CSA maintains and monitors 26 active standpipe piezometers, 9 vibrating wire piezometers, 20 monitoring bores and 5 production bores at the STSF and an additional 12 standpipe piezometers at the NTSF (excised from CML5 lease). Routine data collection from these sites is used to assess the integrity of the STSF wall, and to determine whether any underground seepage of contaminated water into natural areas and/or aquifers has occurred. Water levels are recorded monthly and water quality samples are taken by the Environment Department when required and/or available.

 

Groundwater sampling is conducted as per the principles enunciated in the Standards Association of Australia AS/NZS 5667:1:1998. Baseline groundwater quality data has not been recorded and is difficult to determine given the long history of tailings deposition and uncertainty regarding groundwater flow direction. CSA has commissioned GHD and Golder to conduct independent hydrogeological investigations of the CML5 property. Both studies reported the occurrence of aquifers within adjacent geological features from 12m to 75m below the surface. Groundwater resources were described as being generally acidic to neutral, brackish to saline and characterised by high iron and sulphate concentrations unsuitable for use (without intensive processing) outside of industrial and some agricultural purposes.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 102

 

 

Underlying fault sequences occurring in the proximity of the STSF pose a potential pathway for fluid migration over time. Contemporary seepage has been minimal and confined to the southeast corner of the STSF. Geochemical work indicates that historic tailings deposited in the STSF were potentially acid-forming (PAF) with elevated concentrations of leachable metals (Cu, Pb, Zn, Cd) and sulphate which may be a source of contamination. Contemporary tailings deposition is generally found to be non-acid forming (NAF) with lower potential to leach metals.

 

17.8Social Considerations, Plans, Negotiations and Agreements

 

Native Title

 

The CSA mine lies within the traditional lands of the Ngemba/Ngiyampaa People. A Native Title claim by Ngemba, Ngiyampaa, Wangaaypuwan, and Wayilwan claimants was accepted for registration by the National Native Title Tribunal in April 2012 (NSD38/2019 and NC2012/001). This claim is relevant to the CSA mine operation in that it intersects exploration and mining tenements held by CMPL or its subsidiaries.

 

The claim has not yet been fully determined, but as of September 2021, it has been agreed by parties to the Federal Court proceedings that Native Title has been extinguished over some 89% of land parcels within the Native Title claim area, which includes Western Lands Lease areas. Native Title has been definitively extinguished over all land allotments lying within the boundary of CML5, but not the associated ELs, and once the Native Title claim has been determined, it is likely that that the several parties holding interests in the land (including the State of New South Wales and CMPL or its subsidiaries) will enter into an Indigenous Land Use Agreement to guide the future use and management of land and water within the Native Title claim area that covers the ELs.

 

Community

 

There is strong community support for the CSA operation and CMPL has a positive working relationship with CSC. This is not unexpected given that the CSA mine is the largest employer in the Cobar region, with over 500 employees and contractors.

 

CMPL is involved with a number of community projects including:

 

·assistance with the establishment of regular air services between Sydney and Cobar

 

·regular donations to local community initiatives

 

·scholarships to students entering their final year of university.

 

Overall, there is strong local and state government support for the continuation of mining within the Cobar region.

 

17.9Cultural Heritage

 

Aboriginal Heritage

 

Aboriginal people lived within the Cobar region over a long period of time and this would have resulted in the deposition of a variety of evidence of past occupation. In general terms, the region was suitable for Aboriginal occupation at a low density.

 

Aboriginal cultural heritage is managed through CMPL’s Environmental Management Standard EMS 08 Heritage and Cultural Awareness, which includes protection measures specified in the following plans:

 

·Exploration Environmental Management Plan (PLN-016)

 

·Cultural Heritage and Archaeological Assessment of CML5 – Consultant Report (PLN-032).

 

A Cultural Heritage Survey conducted by external consultants in 2007 (CEC 2007) did not identify any significant Aboriginal heritage at the CSA Mine.

 

Notwithstanding, CMPL is committed to maintaining good relationships with the traditional owners of the land (the Ngiyampaa people). Staff undertaking surface exploration activities are provided with information to allow them to recognise Aboriginal heritage sites or artefacts. All locations where surface disturbance or exploration activities are planned e.g., proposed drill sites, roads and tracks, are checked prior to any disturbance activity for potential Aboriginal heritage sites. In accordance with CMPL’s Site Disturbance Permit-Pre-disturbance Baseline Study and Permit requirements, all disturbance permits include the condition that if any items of cultural heritage significance are found, all work must stop immediately and DECCW consulted to determine if an investigation is required.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 103

 

 

CMPL employees and contractors are instructed to notify the presence of sites of potential importance so that they may be further examined, and appropriate actions taken as a result of any findings. Sites are then documented and identified, with the appropriate department notified for confirmation of status and management advice.

 

Any Aboriginal archaeological finds, artefacts or information concerning Aboriginal sites that are passed on to CMPL are appropriately handled and reported to the NSW OEH within reasonable time of being aware of the location or discovery. No Aboriginal place, object or relic is to be disturbed or damaged without consent or authorization.

 

The Due Diligence Code of Practice for the Protection of the Aboriginal Objects (DECCW 2010) is utilized by the CSA Mine in the assessment of new projects and in all exploration activities undertaken on the mining and exploration leases. The code outlines a ‘Due Diligence’ process to ensure there is no unintended harm to Aboriginal artefacts.

 

No items of aboriginal cultural heritage occur within the CSA mining disturbance zone.

 

European Heritage

 

European mining history dates back to the 1870s when copper was discovered in Cobar. By 1872 a shaft had been sunk at the CSA mine and copper was being extracted.

 

Heritage items within CML5 are managed according to the relevant legislation and guidelines, namely the National Parks and Wildlife Act 1974, the Heritage Act 1977 and the Environmental Planning and Assessment Act 1979. Any heritage assessment required is also conducted in accordance with the Cobar Local Environmental Plan 2012 (LEP) (CSC 2012).

 

The identified European heritage sites of interest on CML 5 include:

 

·Mining Quarters – the site of a miners’ quarters erected in the 1960’s; the site once contained five houses and one swimming pool; these were removed after mine closure in 1998

 

·“Eloura” – located 1.5km from the CSA Mine site; this area shows remnants of old rock gardens and buildings

 

·CSA Power House – contains five HSF8 Mirrlees diesel engines, manufactured in 1951 by Mirrlees, Bickerton and Day in Stockport, England.

 

17.10Mine Rehabilitation and Closure Costs

 

It is a statutory requirement in New South Wales for operating mines to implement rehabilitation management plans. Both the plans, the Rehabilitation Objectives and the Forward Program are legally binding on the approved holder. The rehabilitation plan and the closure objectives and post-closure land uses outlined in the plan are linked to a rehabilitation cost estimate. The rehabilitation cost estimate is used as the basis for the financial assurance which holders are required to lodge with the government.

 

A rehabilitation cost estimate for CSA mine was updated by MAC in 2023 and formally approved by the NSW Resources Regulator on 9 October 2023, at an estimate of A$44M. In BDA’s opinion, given recent changes in government policy and requirements, this estimate is likely a minimum figure for the closure and rehabilitation costs. However, BDA notes that in practice, progressive rehabilitation is typically undertaken over the life of the mine, significantly reducing the final closure cost.

 

Rehabilitation activities at CSA Mine are conducted in accordance with the following documents:

 

·Rehabilitation Management Plan

 

·CSA Mine South Tailings Storage Facility – Closure Plan update (2022)

 

The rehabilitation objectives for the primary domains of CSA are summarized and presented in Table 17.1.

 

A plan-view of the final outline of the mine, associated surface facilities and rehabilitation areas is shown in Figure 4.

 

A long section of the final mine outline and associated underground workings is shown in Figure 16.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 104

 

 

Table 17.1

 

Primary Domains Rehabilitation Objectives

 

Domain Rehabilitation Objective
   
Infrastructure Area

Mining infrastructure within the mining lease area will be removed if no longer required as part of the approved final land use, and the affected lands rehabilitated.

 

Some infrastructure may be retained on site as tourist attractions and for heritage uses, such as the headframe and decline, following further community consultation and any required development approvals.

Water Management Area

The drainage pattern of the final landform will be designed to integrate with the surrounding catchments and will be revegetated to achieve long term stability and erosion control and to harmonize with more general rehabilitation and revegetation strategies.

 

All Water Management Areas are planned to be retained on site until at least 3 – 5 years post mine closure to collect any sediment that may run off the disturbed areas of the mine prior to achieving a successful revegetation cover. Once the closure criteria for runoff water quality have been met, these facilities may be removed if required.

Tailings Storage Facility

Rehabilitated TSFs will be integrated into the final landscape and revegetated to meet the following objectives:

-       tidy and safe with public safety risks reduced to acceptable levels

-       stable and resistant to erosion

-       meets agreed criteria for land or water contamination

-       suitable for the agreed post-mining land use.

Rock Emplacement Areas of rock emplacement at STSF will be rehabilitated and integrated into the final landscape and revegetation strategy.
Topsoil Stockpile Areas of topsoil stockpiles will be rehabilitated and integrated into the final landscape and revegetation strategy.
Exploration Site

All exploration sites will be rehabilitated to a stable and permanent form so that:

-       there is no adverse environmental effect outside the disturbed area and that the land is properly drained and protected from soil erosion

-       the state of the land is compatible with the surrounding land and land use requirements

-       that if landforms, soils, hydrology and native vegetation have been removed or damaged, the original species must be re-established with close reference to the analogue sites; if the original vegetation was not native, any re- established vegetation must be appropriate to the area and at an acceptable density

-       the land does not pose a threat to public safety.

 

STSF Closure

 

The operation of the STSF is undertaken in accordance with the STSF Operating Manual (2015), and its rehabilitation will be as per the STSF Closure Plan update (2022). Documentation is updated as required and governed by operational strategy.

 

Periodic analysis of the tailings is undertaken to confirm the geochemical characteristics of this material. Rehabilitation trials for capping design will be implemented during the MOP and throughout the life of the mine.

 

The primary objectives of the closure strategy for the TSF are to control rainfall runoff and limit seepage from the facility, with the following outcomes:

 

·a progressive reduction in the phreatic surface within the TSF

 

·construction of a drainage system enabling incident rainfall to shed from the landform with limited consequential erosion

 

·establishment of a functional ecosystem with the potential to support a self -sustaining vegetative cover on the outer slopes.

 

Rehabilitation Monitoring

 

Successful rehabilitation of a mine site is conceptually described in terms of logical steps or phases which can be made applicable to each of the similar land management units or domains within the mine site.

 

Since its inception, the CSA monitoring program has adopted this process of comparing rehabilitation areas against reference analogue sites and has adapted the methodology with the various revisions of the NSW Department of Trade & Investment regulatory guidelines.

 

The CSA Mine aims to create stable rehabilitated landforms in areas disturbed by mining. The final landforms would be constructed to be stable in the long-term and integrate with the surrounding landscape. The new landforms will be revegetated with selected species of native and/or endemic vegetation that are both suitable to the physiographic and hydrological features of each landform.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 105

 

 

As the current proposed long-term land use is a Native Ecosystem with light intensity rangeland grazing, local grazing areas situated on the lower slopes which contain a sparse to moderate cover of endemic trees and shrubs are used as part of the analogue monitoring site as a reference point for rehabilitation targets of the current rehabilitation areas.

 

17.11Qualified Person’s Opinion on the Permits, Approvals, Tenements and ESG Aspects

 

The QP considers that CMPL has comprehensive permits, approvals, tenements and environmental management plans and systems in place. CMPL advises that all permits and approvals are in place and that its tenements are in good standing to maintain current operations.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 106

 

 

18Capital and Operating Costs

 

This section contains forward-looking information related to capital and operating cost estimates for the Project.

 

The material factors that could cause actual results to differ materially from the conclusions, estimates, designs, forecasts or projections in the forward-looking information include any significant differences from one or more of the material factors or assumptions that are set forth in this section including prevailing economic conditions projected labour and equipment productivity levels and that contingency is sufficient to account for changes in material factors or assumptions.

 

All capital and operating costs have been estimated in Australian dollars (A$) as this is the currency most costs are incurred in. Costs are subsequently and converted and expressed here in United Stated dollars (US$) at a flat exchange rate of A$1= US$0.71.

 

18.1Capital Costs

 

Capital cost estimates were assembled based primarily on information provided by MAC. All capital costs are expressed in Q1 2024 U.S. dollars.

 

The principal capital works for the CSA mine for which capital costs have been estimated generally comprise:

 

·underground mining capital works including upgrading of the substation, maintenance of fixed and mobile plant, exploration and resource drilling and replacement of major equipment

 

·general sustaining capital for the concentrator

 

·capitalized underground development

 

·rehabilitation of project facilities at the end of the mine life.

 

The forecast costs for capital works over the LOM has informed the capital cost estimate summarized in Table 18.1.

 

Table 18.1

 

CSA Capital Cost Summary

 

Capital Category     Total   2024   2025   2026   2027   2028   2029   2030   2031   2032   2033   2034 
Mining Capital                                                               
Ventilation & Cooling  US$M   33.7    4.7    14.1    11.3    3.0    0.2    0.1    0.2    0.1    -    -    - 
Maintenance - Mobile Plant  US$M   6.7    0.7    0.9    0.8    0.7    0.8    0.7    0.8    0.8    0.5    -    - 
Maintenance - Fixed Plant/ Electrical  US$M   15.7    2.1    4.6    4.3    1.4    2.2    1.2    -    -    -    -    - 
Geological Drilling  US$M   2.7    0.5    0.7    0.7    0.7    -    -    -    -    -    -    - 
Other Costs, Miscellaneous  US$M   9.8    2.0    2.0    1.0    0.6    0.7    0.9    0.4    0.7    0.7    0.7    - 
Capitalized Development  US$M   174.1    52.2    55.1    38.8    14.0    7.1    1.1    2.8    2.4    0.2    0.2    0.2 
Sub-Total Mining  US$M   242.7    62.2    77.4    56.9    20.4    11    4    4.2    4    1.4    0.9    0.2 
Processing Capital  US$M   16.1    5.9    2.9    3.1    2.0    1.1    0.4    0.6    -    -    -    - 
Tailing Storage Facility  US$M   22.1    0.9    10.6    -    -    10.6    -    -    -    -    -    - 
Rehabilitation Costs  US$M   27.5    -    -    -    -    -    -    -    -    -    -    27.5 
Total Capex  US$M   308.3    69.1    90.9    60.0    22.5    22.6    4.4    4.8    4.0    1.4    0.9    27.7 

 

The capital costs were estimated by CMPL as part of studies into the necessity for, and the feasibility of, the upgrade works and as part of the CMPL LOM planning. LOM planning is used for decision making in order to direct study efforts only.

 

Capitalized Maintenance Costs for mobile and fixed plant have been estimated from historical maintenance costs.

 

The estimates of Geological Drilling costs have been determined from the meters of drilling planned for each year, applied to historical costs per meter.

 

Other Costs, which are included in the cost model as part of the Mining Capital total include costs for underground and above ground services to support the mining operation. The major components of Other Costs comprise the costs for:

 

·mining projects including underground paste fill reticulation, a diamond drilling workshop, subsidence area fencing, and refuge chambers

 

·pumps and pipework for underground water supply and removal

 

·electrical equipment required for underground infrastructure.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 107

 

 

The estimates of these Other Costs were determined by MAC on the basis of quotations from prospective suppliers and contractors and the experience and expertise of MAC management. BDA considers the estimates to be appropriate for the MAC plan.

 

The Major Equipment capital costs are the costs for replacing equipment which has reached the end of its useful operating life. The numbers of each type of equipment have been taken from the mining equipment schedules described in Section 13 – Mining Methods. Unit costs for equipment items have been determined from historical costs and current budget prices from equipment suppliers.

 

Capitalized Development costs have been estimated by MAC based on historical costs and performance.

 

The MAC Rehabilitation Costs include the costs of rehabilitating the TSFs and, as noted in Section 0 of this report, are based on the estimate of costs determined in a rehabilitation closure review conducted in 2023 which was based on the costs and capping requirements as per the NSW Resource Regulator – Rehabilitation Cost Estimate Spreadsheet.

 

Maintenance of Fixed and Mobile plant

 

The Fixed and Mobile Plant Maintenance capital programme is being carried out in accordance with the maintenance plans for the mining and processing facilities. The status of the maintenance is reported to be satisfactory as described in Section 13 and Section 14.

 

Geological Drilling

 

Geological Drilling for resource definition is being carried out by CMPL in accordance with the CSA geological work plan and budget.

 

Replacement of Major Equipment

 

Major Equipment Replacement is being carried out as equipment items reach the end of their useful life. As discussed in Section 13, in 2023 CSA completed a full replacement of the underground truck and loader fleet, which are operating under a leasing arrangement with Sandvik, the equipment manufacturer.

 

At the current rate of operating hours across the load and haul fleet, CSA expects to begin end of life replacement in approximately 2-3 years. Costs associated with the future replacement of the LHD and haul truck fleet are allocated to operating costs (not capital) due to the continuation of the Sandvik leasing arrangement.

 

Process Sustaining Capital

 

The concentrator grinding circuit upgrade commenced in 2020 and was complete in 2023.

 

Process sustaining capital includes incremental replacement of processing equipment and supporting infrastructure commensurate with ongoing maintenance of the plant. Process plant capital also includes replacement and upgrade works for equipment such as flotation circuit modifications, concentrate train container replacement, process plant general structural repairs, rail line maintenance, surface services upgrades and general site maintenance and upgrades.

 

Tailings Storage Facility

 

The Southern Tailings Storage Facility (STSF) has an average deposition rate of 55kt per month. At the current rate, based on the latest Stage 9 embankment raise, the STSF has capacity to store tailings up to February 2025. The next embankment raise for which the capital is allocated, Stage 10, will have sufficient storage capacity until approximately 2028 with Stage 11 raise seeing the operation through until approximately 2032. For the remaining two years of the Reserve mine life and anticipated future mine life extensions beyond the current Mineral Reserves, CSA has identified preferred location options for the next tailings storage facility (including the potential use of the NTSF). As refinement of preliminary designs and estimates for Stage 11 and alternative facilities are currently underway, capital costs for Stage 11 have been increased to cater for the remaining two years of storage required under the Reserve life of mine.

 

Capitalized Underground Development

 

The capitalized underground development is proceeding as part of overall underground development in accordance with the mine plan as described in Section 13 – Mining Methods.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 108

 

 

Rehabilitation of Project Facilities

 

No action has been taken in relation to the rehabilitation of project facilities apart from on-going rehabilitation of waste dumps and TSF facilities which form part of normal operations. Rehabilitation of mining, processing and infrastructure facilities will be undertaken at the end of the mine life.

 

Accuracy and Contingency

 

Item 1302 of Regulation S-K sets out the requirements for capital cost estimates in initial assessments, preliminary feasibility studies and feasibility studies. In this case, where the project has been in operation for many years and the capital expenditure is for upgrading existing facilities and for sustaining capital, BDA considers that the appropriate requirements are those for feasibility studies. These requirements are that a feasibility study must, at a minimum, have an accuracy level of approximately ±15% and a contingency range not exceeding 10%.

 

18.2Operating Costs

 

Table 18.2 provides a site operating cost summary showing forecast operating cost estimates proposed by MAC for the following seven years. Further breakdowns of CSA Mining, Processing and G&A operating costs are shown in Site Operating Cost Summary

 

Description  Unit  2024   2025   2026   2027   2028   2029   2030   2031   2032   2033   2034 
Costs                                                          
Mining  US$M   86.5    102.0    119.1    114.4    117.3    106.4    105.4    107.1    105.2    100.9    74.2 
Processing  US$M   23.5    26.1    27.4    27.4    27.4    27.4    27.4    27.4    27.4    27.3    18.0 
General & Admin  US$M   24.6    27.3    28.7    28.7    28.7    28.6    28.6    28.6    28.7    28.6    18.8 
Total Site Opex  US$M   134.7    155.4    175.2    170.5    173.4    162.4    161.3    163.1    161.3    156.8    111.0 
Total – Unit Costs  US$/t ore   126.0    120.8    125.2    121.8    123.9    116.2    115.7    116.8    115.2    112.7    107.3 

 

Note: “Opex” = Operating Expenditure; “F” = forecast operating cost developed by MAC. AU$:US$ = 0.71

 

Table 18.3, Breakdown of Mining Operating Costs

 

Description  Unit  Total   2024   2025   2026   2027   2028   2029   2030   2031   2032   2033   2034 
Salaries (Employees)  US$/t Ore   13.9    21.0    17.9    17.5    15.4    15.3    10.9    10.5    10.5    10.1    9.2    8.6 
Salaries & Related Costs (Contractors)  US$/t Ore   14.9    14.9    14.9    14.9    14.9    14.9    14.9    14.9    14.9    14.9    14.9    14.9 
Power & Water  US$/t Ore   8.3    8.3    8.3    8.3    8.3    8.3    8.3    8.3    8.3    8.3    8.3    8.3 
Production Purchase Costs  US$/t Ore   22.4    22.4    22.4    22.4    22.4    22.4    22.4    22.4    22.4    22.4    22.4    22.4 
Administrative/Office Expenses  US$/t Ore   17.5    17.5    17.5    17.5    17.5    17.5    17.5    17.5    17.5    17.5    17.5    17.5 
Less Capitalized Development  US$/t Ore   (10.2)   (31.6)   (28.4)   (19.8)   (8.6)   (4.5)   (0.7)   (1.9)   (1.6)   (0.1)   (0.2)   (0.2)
Total - Mining Opex  US$/t Ore   78.2    81.0    79.3    85.1    81.7    83.8    76.1    75.6    76.7    75.1    72.5    71.7 

 

Note: “A” = actual operating costs from the CSA operation. “F” = forecast operating cost developed by MAC. AU$:US$ = 0.71

 

Table 18.4 and Breakdown of Processing Operating Costs

 

Description  Unit  Total   2024   2025   2026   2027   2028   2029   2030   2031   2032   2033   2034 
Salaries (Employees)  US$/t Milled   7.9    10.2    8.5    7.8    7.8    7.8    7.8    7.8    7.8    7.8    7.8    5.6 
Salaries & Related Costs (Contractors)  US$/t Milled   4.4    4.4    4.4    4.4    4.4    4.4    4.4    4.4    4.4    4.4    4.4    4.4 
Power & Water  US$/t Milled   3.6    3.6    3.6    3.6    3.6    3.6    3.6    3.6    3.6    3.6    3.6    3.6 
Production Purchase Costs  US$/t Milled   3.5    3.5    3.5    3.5    3.5    3.5    3.5    3.5    3.5    3.5    3.5    3.5 
Administrative/Office Expenses  US$/t Milled   0.3    0.3    0.3    0.3    0.3    0.3    0.3    0.3    0.3    0.3    0.3    0.3 
Total - Processing Opex  US$/t Milled   19.7    22.0    20.3    19.6    19.6    19.6    19.6    19.6    19.6    19.6    19.6    17.4 

 

Note: “A” = actual operating costs from the CSA operation. “F” = forecast operating cost developed by MAC. AU$:US$ = 0.71

 

Table 18.5, respectively.

 

Table 18.2

 

Site Operating Cost Summary

 

Description  Unit  2024   2025   2026   2027   2028   2029   2030   2031   2032   2033   2034 
Costs                                                          
Mining  US$M   86.5    102.0    119.1    114.4    117.3    106.4    105.4    107.1    105.2    100.9    74.2 
Processing  US$M   23.5    26.1    27.4    27.4    27.4    27.4    27.4    27.4    27.4    27.3    18.0 
General & Admin  US$M   24.6    27.3    28.7    28.7    28.7    28.6    28.6    28.6    28.7    28.6    18.8 
Total Site Opex  US$M   134.7    155.4    175.2    170.5    173.4    162.4    161.3    163.1    161.3    156.8    111.0 
Total – Unit Costs  US$/t ore   126.0    120.8    125.2    121.8    123.9    116.2    115.7    116.8    115.2    112.7    107.3 

 

Note: “Opex” = Operating Expenditure; “F” = forecast operating cost developed by MAC. AU$:US$ = 0.71

 

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 109

 

 

Table 18.3

 

Breakdown of Mining Operating Costs

 

Description  Unit  Total   2024   2025   2026   2027   2028   2029   2030   2031   2032   2033   2034 
Salaries (Employees)  US$/t Ore   13.9    21.0    17.9    17.5    15.4    15.3    10.9    10.5    10.5    10.1    9.2    8.6 
Salaries & Related Costs (Contractors)  US$/t Ore   14.9    14.9    14.9    14.9    14.9    14.9    14.9    14.9    14.9    14.9    14.9    14.9 
Power & Water  US$/t Ore   8.3    8.3    8.3    8.3    8.3    8.3    8.3    8.3    8.3    8.3    8.3    8.3 
Production Purchase Costs  US$/t Ore   22.4    22.4    22.4    22.4    22.4    22.4    22.4    22.4    22.4    22.4    22.4    22.4 
Administrative/Office Expenses  US$/t Ore   17.5    17.5    17.5    17.5    17.5    17.5    17.5    17.5    17.5    17.5    17.5    17.5 
Less Capitalized Development  US$/t Ore   (10.2)   (31.6)   (28.4)   (19.8)   (8.6)   (4.5)   (0.7)   (1.9)   (1.6)   (0.1)   (0.2)   (0.2)
Total - Mining Opex  US$/t Ore   78.2    81.0    79.3    85.1    81.7    83.8    76.1    75.6    76.7    75.1    72.5    71.7 

 

Note: “A” = actual operating costs from the CSA operation. “F” = forecast operating cost developed by MAC. AU$:US$ = 0.71

 

Table 18.4

 

Breakdown of Processing Operating Costs

 

Description  Unit  Total   2024   2025   2026   2027   2028   2029   2030   2031   2032   2033   2034 
Salaries (Employees)  US$/t Milled   7.9    10.2    8.5    7.8    7.8    7.8    7.8    7.8    7.8    7.8    7.8    5.6 
Salaries & Related Costs (Contractors)  US$/t Milled   4.4    4.4    4.4    4.4    4.4    4.4    4.4    4.4    4.4    4.4    4.4    4.4 
Power & Water  US$/t Milled   3.6    3.6    3.6    3.6    3.6    3.6    3.6    3.6    3.6    3.6    3.6    3.6 
Production Purchase Costs  US$/t Milled   3.5    3.5    3.5    3.5    3.5    3.5    3.5    3.5    3.5    3.5    3.5    3.5 
Administrative/Office Expenses  US$/t Milled   0.3    0.3    0.3    0.3    0.3    0.3    0.3    0.3    0.3    0.3    0.3    0.3 
Total - Processing Opex  US$/t Milled   19.7    22.0    20.3    19.6    19.6    19.6    19.6    19.6    19.6    19.6    19.6    17.4 

 

Note: “A” = actual operating costs from the CSA operation. “F” = forecast operating cost developed by MAC. AU$:US$ = 0.71

 

Table 18.5

 

Breakdown of G&A Operating Costs

 

Description  Unit  Total   2024   2025   2026   2027   2028   2029   2030   2031   2032   2033   2034 
Salaries (Employees)  US$/t Milled   8.4    10.9    9.1    8.3    8.3    8.3    8.4    8.4    8.4    8.3    8.4    6.0 
Salaries & Related Costs (Contractors)  US$/t Milled   3.4    3.4    3.4    3.4    3.4    3.4    3.4    3.4    3.4    3.4    3.4    3.4 
Power & water  US$/t Milled   1.0    1.0    1.0    1.0    1.0    1.0    1.0    1.0    1.0    1.0    1.0    1.0 
Production Purchase Costs  US$/t Milled   5.9    5.9    5.9    5.9    5.9    5.9    5.9    5.9    5.9    5.9    5.9    5.9 
Administrative/Office Expenses  US$/t Milled   1.9    1.9    1.9    1.9    1.9    1.9    1.9    1.9    1.9    1.9    1.9    1.9 
Total - G&A Opex  US$/t Milled   20.6    23.1    21.2    20.5    20.5    20.5    20.5    20.5    20.5    20.5    20.5    18.2 

 

Note: “A” = actual operating costs from the CSA operation. “F” = forecast operating cost developed by MAC. AU$:US$ = 0.71

 

The MAC forecast operating costs are estimated using CMPL actual costs as the underlying basis. The split between capitalized development and underground mining cost is calculated during the mine planning process and based on the function of the underground development being established, with its respective allocation to mining operations or capital infrastructure. MAC typically forecasts total site costs for mining, processing, G&A and capitalized development combined (reported in A$) to determine the appropriate cost estimates.

 

BDA notes that CMPL identified productivity improvement some 2-3 years ago but appears to have had only modest success in achieving performance improvement or cost savings. Nevertheless, BDA recognises that there is opportunity for productivity improvements underground.

 

The CSA mine has a relatively high proportion of fixed costs; any performance improvement will lead to reduced unit operating costs. Mining is responsible for around 66% of site cash costs and 55% of total cash costs. Of the site mining costs, 37% relates to labour and contractor costs.

 

Mine operating costs in Australia have seen substantial increases over the last few years due to labour shortages and material and logistic cost increases. Skilled labour shortages remain acute at all mine sites, pushing up costs and impacting productivity.

 

The MAC ore mining rate is forecast to increase from 2024 onwards to around 1.4Mtpa, with the unit ore mining cost decreasing from around US$84/t ore to around US$71/t ore, averaging US$77/t over the LOM. The slight reduction in unit rates in 2024 is a function of more costs being allocated to capitalized development, with a total of US$32/t of ore allocated to this in 2024 compared to a LOM average of US$10/t.

 

The process operating costs are reasonably well documented in the CSA monthly reports. MAC is forecasting unit processing costs to be around US$20/t milled, which appears achievable if the mill throughput rates can be achieved.

 

The MAC estimate assumes similar G&A costs compared with 2023, averaging approximately US$20/t milled. Overall, the unit costs appear achievable provided the planned efficiencies are implemented and the mine and mill production forecasts can be achieved.

 

Realization Costs and Offsite Costs

 

Realization and offsite costs comprise rail freight to Newcastle Port, concentrate storage at Newcastle, ship loading costs, sea freight, Treatment Charges and Refining Charges (“TCs and RCs”).

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 110

 

 

MAC has assumed US$38/wmt for sea freight handling for the LOM based on Feb 2023 quotes plus an additional US$31/wmt for other freight and handling costs.

 

Treatment and Refining Charges

 

BDA’s review of CSA historical data suggests payment terms reasonably consistent with other copper concentrate offtake agreements including penalty terms, insurance and force majeure. Benchmark TCs and RCs typically vary year on year with the state of the copper concentrate market, for example, in 2021 the Benchmark TC was US$65/t and the RC was US$0.065/per payable pound of Cu. TCs and RCs have been lower than this in the recent past and have trended higher over 2023 as the concentrate market returned to a more normal state but have now once again started trending lower with the oversupply of smelter capacity with the potential for benchmark terms to return to around the 2021 Benchmark going forward.

 

For the reserve estimation and financial model, a LOM TC/RC of US$60/6.0c has been assumed based on management’s assessment of possible forward benchmark terms.

 

Basis of Estimate

 

Capital and operating costs were developed based on historical cost performance and first principal calculations based on current commodity costs, labour rates and equipment costs. The costs are provided for each major cost centre including mining, processing, G&A, off site costs, major capital works and fleet replacement and closure costs.

 

18.3Qualified Person’s Opinion on the Adequacy of Capital and Operating Costs

 

The QP considers the capital and operating cost forecasts to be at a Definitive Feasibility Study level of confidence and accuracy, or better. Capital contingency costs in the order of 10% have been included. The stated estimate accuracy of ±15% appears conservative, with cost history in recent years conforming close to budget. Operating cost forecasts have relied heavier on actual operating cost knowledge. The QP considers that the stated accuracy and contingency ranges meet Definitive Feasibility Study standards as required under SK 1300.

 

19Economic Analysis

 

19.1Forward-looking Information Caution

 

This section contains forward-looking information related to economic analysis for the Project. The material factors that could cause actual results to differ materially from the conclusions, estimates, designs, forecasts or projections in the forward-looking information include any significant differences from one or more of the material factors or assumptions that are set forth in this sub-section including estimated capital and operating costs, project schedule and approvals timing, availability of funding, projected commodities markets and prices.

 

All costs, prices, and monetary values are in Q1 2024 United States Dollars (US$).

 

19.2Principal Assumptions

 

Production:

 

The schedule for the CSA Mine with an 11-year mine life entails approximately:

 

·14.6Mt of ore

 

·2.5Mt of waste

 

·17.1Mt of total material mined.

 

Commodity Pricing

 

The commodities prices considered are as shown below:

 

·Copper Price - US$8,279/t (US$3.76/lb) - the Company elected to adopt this price assumption in line with the long-term, real, Broker Consensus forecast copper price outlined in Section 16.4.

 

·Silver Price – US$22.60/oz - the Company elected to adopt this price assumption in line with the long-term, real, Broker Consensus forecast silver price outlined in Section 16.7.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 111

 

 

Discount Rate

 

A discount rate of 8% was used in this economic analysis. This is considered reasonable, though somewhat conservative for CSA, considering it is an operating mine with a long history, cashflow producing and thorough understanding of the costs and risks associated with the operation.

 

Exchange Rate

 

Costs are predominately incurred in A$ and have been converted to US$ at a flat rate of 0.71. The discounted cashflow basis is on a US$ basis.

 

19.3Results of Economic Analysis

 

As shown in Table 19.1, the following parameters were estimated:

 

·Total Revenue: the total sales revenue of US$3.8 billion (B) includes copper and silver sales
·Total Operating Cost: total operating cost is estimated to be US$2.3B including all off site, realization and corporate costs
·Rehabilitation Cost: a total of US$27.5M is allocated in the year following completion of mining in line with the current government closure bond
·EBITDA: the EBITDA is estimated to be US$1.5B
·Taxes: tax rate of 30% on taxable income plus a 4% State government royalty and a 1.5% copper net smelter royalty payable to GIAG; first income tax becomes payable in 2028
·Capital Expenditures: the total capital expenditure, including capitalized development, is US$308M
·Net Present Value: the after tax NPV is US$708M at a discount rate of 8%.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 112

 

 

Table 19.1

 

Economic Analysis of CSA Reserve LOM

 

Description   Unit  Total/Avg   2024   2025   2026   2027   2028   2029   2030   2031   2032   2033   2034 
Mine Physicals                                                               
Ore Mined  kt   14,569    1,068    1,286    1,400    1,400    1,400    1,398    1,395    1,396    1,400    1,391    1,035 
Waste Mined  kt   2,479    580    652    558    236    186    54    74    92    38    6    2 
Total Material Mined  kt   17,048    1,649    1,939    1,958    1,636    1,586    1,451    1,468    1,488    1,438    1,397    1,037 
Cu Grade  %   3.29    3.64    3.34    3.58    3.52    3.46    3.43    3.09    3.04    3.06    2.85    3.20 
Ag Grade  g/t   12.9    15.6    12.1    14.2    13.1    12.6    12.8    11.6    12.1    12.6    11.3    14.5 
Processing                                                               
Cu Recovery  %   97.5    97.5    97.5    97.5    97.5    97.5    97.5    97.5    97.5    97.5    97.5    97.5 
Ag Recovery  %   80.0    80.0    80.0    80.0    80.0    80.0    80.0    80.0    80.0    80.0    80.0    80.0 
Recovered Cu  kt   466.8    37.9    42.0    48.8    48.1    47.2    46.7    42.0    41.4    41.8    38.7    32.2 
Recovered Ag  koz   4818.5    430.0    399.2    512.0    470.5    452.5    459.2    417.8    433.8    454.7    404.0    384.9 
Cash Flow Analysis                                                               
Cu Price  US$/t   8,279.3    8,279.3    8,279.3    8,279.3    8,279.3    8,279.3    8,279.3    8,279.3    8,279.3    8,279.3    8,279.3    8,279.3 
Ag Price  US$/oz   22.6    22.6    22.6    22.6    22.6    22.6    22.6    22.6    22.6    22.6    22.6    22.6 
Cu Gross Revenue  US$M   3,716.2    301.7    334.0    388.7    383.0    375.5    372.0    334.6    329.8    332.4    307.9    256.6 
Ag Gross Revenue  US$M   98.0    8.7    8.1    10.4    9.6    9.2    9.3    8.5    8.8    9.2    8.2    7.8 
Gross Revenue (Total)  US$M   3,814.2    310.4    342.1    399.1    392.6    384.7    381.3    343.1    338.7    341.7    316.1    264.4 
(-) Mining Costs  US$M   (1,138.5)   (86.5)   (102.0)   (119.1)   (114.4)   (117.3)   (106.4)   (105.4)   (107.1)   (105.2)   (100.9)   (74.2)
(-) Processing Costs  US$M   (286.7)   (23.5)   (26.1)   (27.4)   (27.4)   (27.4)   (27.4)   (27.4)   (27.4)   (27.4)   (27.3)   (18.0)
(-) Minesite G&A  US$M   (299.8)   (24.6)   (27.3)   (28.7)   (28.7)   (28.7)   (28.6)   (28.6)   (28.6)   (28.7)   (28.6)   (18.8)
(-) Freight  US$M   (74.4)   (6.0)   (6.7)   (7.8)   (7.7)   (7.5)   (7.4)   (6.7)   (6.6)   (6.7)   (6.2)   (5.1)
(-) Realization Charge  US$M   (84.4)   (6.9)   (7.6)   (8.8)   (8.7)   (8.5)   (8.4)   (7.6)   (7.5)   (7.6)   (7.0)   (5.9)
(-) TC/RCs  US$M   (171.6)   (18.3)   (10.2)   (17.0)   (17.9)   (17.6)   (17.4)   (15.7)   (15.5)   (15.6)   (14.4)   (12.1)
(-) Royalties  US$M   (141.7)   (11.4)   (13.2)   (15.7)   (15.2)   (14.7)   (14.5)   (12.5)   (12.2)   (12.4)   (11.0)   (8.8)
(-) Corporate Costs  US$M   (97.5)   (9.7)   (9.7)   (9.7)   (9.7)   (9.7)   (9.7)   (9.7)   (9.7)   (9.7)   (6.8)   (3.4)
EBITDA  US$M   1,519.6    123.5    139.3    165.0    162.9    153.3    161.4    129.6    124.0    128.6    113.9    118.1 
(-) Total Cash Financing Cost  US$M   (330.3)   (46.9)   (45.7)   (41.3)   (52.8)   (24.1)   (23.0)   (22.0)   (22.4)   (22.1)   (19.3)   (10.5)
(-) Taxes (Cash)  US$M   (107.1)   0.00    0.00    0.00    0.00    (7.5)   (16.7)   (16.5)   (16.4)   (16.4)   (16.9)   (16.7)
(-) CAPEX (Sustaining)  US$M   (106.8)   (17.0)   (35.8)   (21.2)   (8.4)   (15.5)   (3.4)   (2.0)   (1.6)   (1.2)   (0.7)   0.00 
(-) Capitalized Development  US$M   (174.1)   (52.2)   (55.1)   (38.8)   (14.0)   (7.1)   (1.1)   (2.8)   (2.4)   (0.2)   (0.2)   (0.2)
(-) Rehabilitation Costs  US$M   (27.5)   0.00    0.00    0.00    0.00    0.00    0.00    0.00    0.00    0.00    0.00    (27.5)
(-) NWC Change  US$M   (0.5)   1.96    2.09    1.77    (0.5)   0.54    (1.4)   0.54    0.33    (0.3)   (0.2)   (5.3)
Unlevered Free Cash Flow  US$M   1,103.7    56.3    50.5    106.8    139.9    123.8    138.8    108.9    103.9    110.5    95.9    68.4 
Levered Free Cash Flow  US$M   773.4    9.4    4.8    65.5    87.1    99.7    115.8    86.9    81.4    88.4    76.6    57.9 
Discounted Cash Flow 8%  US$M   707.6    56.3    43.3    84.8    102.8    84.2    87.5    63.5    56.1    55.3    44.4    29.3 

 

19.4Sensitivity Analysis

 

The sensitivity analysis was carried out by independently varying the copper price, operating cost, and capital cost. The results of the sensitivity analysis are shown in Figure 26.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 113

 

 

Figure 26

 

Sensitivity Analysis of Mineral Reserve Economic Analysis

 

 

As seen in the above figure, the project NPV is most sensitive to copper price and least sensitive to capital. This is to be expected for a mature, well-established project with much of its infrastructure already in place and no significantly large projects currently planned during the mine life discussed in this report.

 

19.5Qualified Person’s Opinion on the Economic Analysis

 

Given the long operating history of the CSA Mine, the QP considers the accuracy and contingency of cost estimates to be well within a Definitive Feasibility Study (DFS) standard and sufficient for the economic analysis supporting the Mineral Reserve estimate for the CSA Mine.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 114

 

 

20Adjacent Properties

 

The CSA mine is wholly contained within CML5, which is surrounded by a network of Exploration Licences also wholly owned by CMPL. For all practical purposes, the CSA mine has no adjacent properties that are likely to have any influence on its operations. In the broader region, other resource companies hold exploration tenements; most are considered to be at an early stage of evaluation.

 

21Other Relevant Data and Information

 

The QP considers that all relevant data and information is contained within the body of this Technical Report Summary.

 

22Interpretation and Conclusions

 

22.1Conclusions

 

The purpose of this Technical Report is to report the Mineral Reserve Estimate and Mineral Resource Estimate for CSA, both of which have an effective date of August 31st, 2023 and, in the opinion of the QPs, are reported here in accordance with the SEC S-K 1300 regulations.

 

The CSA mine is located in western New South Wales near the town of Cobar. The mine has a well-established production history. The mining tenements provide appropriate coverage for the current operations and include potential extensions of mineralization and mine life. The statutory development approvals and licences are well established and have been relied upon for many years and are unlikely to present any significant challenges for the life of the Reserve.

 

BDA has not identified any material issues in respect of environmental approvals, compliance or the reporting requirements for the CSA mine. In BDA’s opinion, CMPL has identified potential environmental impacts likely to be associated with the CSA mine operations and has in-place appropriate mitigative design and operations.

 

CSA is an established operation with a relatively long mining history. The mine has had a number of owners and operators over the years, with Glencore having operated the mine for the 23 years prior to its acquisition by the Company in June 2023. In this time additional lodes have been discovered, mostly at depth. Significant resources remain with the major lodes still open at depth.

 

After many years of mining, drilling, and surface and underground mapping, the geology and mineralization of the CSA mine and of the surrounding Cobar Basin are well understood. The CSA lodes are all steeply dipping with relatively short strike lengths and widths, but with a significant down dip extent. Both of the two principal current systems (QTSN and QTSC) are blind orebodies occurring from depths of 600m and 1,200m respectively. Both remain open at depth with the deepest intersections at around 2,200m below surface.

 

BDA considers there is significant potential to extend the estimated resources within the CSA mineralized lodes, principally at depth, but also with some shallower mineralization. In recent years resource and reserve additions have more than kept pace with depletion through mining.

 

The CSA mine is a complex operation due to the various mining methods, the number of active stopes, the number of work areas, the depth, geotechnical challenges, backfill challenges and ventilation/cooling challenges. As the CSA team understand, it is important to have contingency plans, so that should an adverse event occur, alternate access and working areas are available and any loss in production can be countered. The dominance of the QTS North orebody creates some concentration risk, and ideally resources in the other mineralized systems should be worked up to provide contingent ore sources. One of the critical aspects to achieving these objectives is to prioritize and increase development.

 

CSA underground mining production is the primary determining factor relating to annual concentrate sales, due to the excess capacity available in downstream infrastructure. With approximately 2.3Mtpa of combined hoisting capacity in the two shafts and 1.4Mtpa concentrate processing capacity in the processing plant, considerable effort in recent years and recent capital expenditure programs have been aimed at maximizing ore production as the mine gets deeper.

 

BDA considers the metallurgical performance at CSA to be good with high copper recoveries, reasonable copper concentrate grades and payable silver grades. Based on the consistency of ore feed quality and metallurgy over the years there is no reason to consider this performance will not be maintained. There is no suggestion that future ore variability will necessitate any blending.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 115

 

 

The CSA mine is well established with all the supporting infrastructure required to support current operations.

 

The Southern Tailings Storage Facility (STSF) has an average deposition rate of 55kt per month. At the current rate, based on the latest Stage 9 embankment raise, the STSF has capacity to store tailings up to February 2025. The next embankment raise, Stage 10, will have sufficient storage capacity until approximately 2028 with Stage 11 raise seeing the operation through until approximately 2032. For the remaining two years of the Reserve mine life, as well as anticipated future mine life extensions beyond the current Mineral Reserves, CSA has identified preferred location options for the next tailings storage facility (including the potential use of the NTSF). Refinement of preliminary designs and estimates are currently underway.

 

CSA mine operations are mining constrained with current production planned at 1.2-1.4Mt of ore per annum (1.2-1.4Mtpa) for the Mineral Reserve estimation process, which the QP considers to be readily achievable with the mobile equipment, fixed infrastructure and human resources currently maintained by CSA operational team.

 

The copper market in which CMPL operates is a deep, liquid market where copper is traded globally in both cathode and concentrate forms. CMPL operates within the global copper industry and faces competition from other copper producers for its main product.

 

The concentrate produced at CSA is a high-quality product, with no deleterious elements above penalty levels and is highly sought after for blending with other concentrates.

 

Under MAC’s ownership, the Offtake Agreement for the CSA mine commits 100% of the produced concentrate for the life of mine to GIAG, as the sole customer. The offtake terms are referenced to the annual Benchmark terms set by the industry and published annually and are therefore considered market competitive.

 

CMPL’s 2023 estimate of closure costs, to rehabilitate the existing disturbance area at CSA mine, totals approximately A$44M.

 

The Mineral Resource QP considers that the Mineral Resource estimation for the CSA mine has been carried out professionally and is consistent with industry standards. The drilling, assaying, and density data is considered to provide an acceptable basis for resource estimation, and the geological modelling provides an appropriate framework. Annual reconciliations confirm that the resource estimates provide a reasonable guide to the in-situ tonnes and grade.

 

Similarly, the Mineral Reserve QP considers that the Mineral Reserve estimate for CSA mine provides an appropriate estimation of the economically viable Mineral Reserve and has been prepared using industry accepted practices. The LOM forecasts based on the Mineral Reserves are considered to provide a conservative estimate of the likely life of mine, given the historical experience of regular reserve replacement and the known down-dip extensions of the mineralized lodes.

 

As part of the estimation of the Mineral Reserve, a mining schedule was developed using industry accepted methodologies and an economic analysis was performed to verify the economic viability of the Mineral Reserve and the associated Life of Mine.

 

The economic analysis on the CSA Mine was conducted based on a mine design and schedule of the Reserve. A Discounted Cashflow (DCF) model was developed for this Reserve Case using copper and silver product prices of US$8,279/t and US$22.60/oz, respectively, in line with the long-term, real, Consensus forecast prices outlined in Section 16.

 

The discounted cashflow establishes that the Mineral Reserves as referenced in this report are economically viable. The base case after-tax NPV (8%) is estimated to be US$708M. The Net Present Value for this study is most sensitive to copper price.

 

BDA considers that operating and capital costs, the methodology and data used for the preparation of the estimates would be expected to result in estimates with an accuracy of around +15% and the estimates for the major capital works include contingency allowances of around 10%.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 116

 

 

22.2Risks

 

When compared with many industrial and commercial operations, mining is a relatively high-risk business. Each orebody is unique. The nature of the orebody, the occurrence, quality, grade and mineralogy of the ore, and its behaviour during mining and processing can never be wholly predicted. Estimations of the tonnes and grade of a deposit are not precise calculations but are based on interpretation and on samples from drilling which, even at close drill hole spacing, remain very small samples of the whole orebody.

 

Mining is subject to geotechnical risks, and in the case of deep underground mines, temperature and ventilation issues. Process throughput and recoveries are subject to consistency of ore types and mineralogy. Estimations of project capital and operating costs are rarely more accurate than ±10-15%. Mining project revenues are subject to variations in commodity prices and exchange rates.

 

In reviewing the CSA mine operation, BDA has considered areas where there is perceived technical risk to the operation, particularly where the risk component could materially impact the projected cashflows. However, BDA notes that in an established operation such as CSA, many of the uncertainties and risks are moderated by the long and relatively consistent history of operations and production.

 

Risk has been classified from low through to high. In Section 22.3, BDA has considered factors which may ameliorate some of the project risks.

 

Table 22.1

 

Risk Summary

 

Risk Component Comments
   

Resources/Reserves
Low Risk

The current Mineral Resources are generally well defined based on diamond drilling and underground mapping and sampling. The geology, geological controls and the lodes and mineralized systems are well understood. There is a long history of mining at CSA and systematic reconciliations undertaken monthly, quarterly and annually show that the resource models provide a reliable guide to the mineralization and that the mine designs, recovery and dilution factors are realistic and achievable.

 

Logging, sampling, assaying and QA/QC systems are appropriate and consistent with industry standards.

 

The Mineral Reserve estimate is based on the CMPL estimated Measured and Indicated resources. This is considered a conservative estimate as a review of the CMPL Inferred blocks suggests that certain of these could well be categorized as Indicated and hence available for conversion to reserves. This opinion has been confirmed by Cube acting as QP.

 

BDA notes that increasing depths bring geotechnical and temperature issues that require careful management, and that these factors could impact on the mineability of some blocks in the future. However, to date this aspect has been well managed and BDA does not consider that there is a significant risk to the current Mineral Reserves.

 

Overall, BDA considers that the current resource and reserve estimates provide a reasonable, but probably conservative, guide to the in situ and recoverable mineralization respectively.

 

There remains significant mineralization within the mine area, most notably the down dip extensions of lodes which remain open at depth. Drilling at depth is relatively sparse, such that these projections cannot be incorporated into current reserves. Nevertheless, there is reasonable expectation that the mine life will extend well beyond the current reserve limits, and the mine has a long history of ongoing reserve replacement.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 117

 

 

Table 22.2 (Continued)

 

Risk Summary

 

Risk Component Comments
   

Underground Mining

Medium Risk

CSA is a complex mine due to the various mining methods, the number of stopes, the number of work areas, the depth, geotechnical challenges, backfill challenges and ventilation/cooling challenges. It is unlikely that adverse events can be totally eliminated. It is therefore important to have contingency plans, so that should an adverse event occur, alternate access and working areas are available and any loss in production can be made up as quickly as possible. The future dominance of the QTS North orebodies creates some concentration risk. Resources in the other orebodies and exploration strategy should be worked up to provide contingent ore sources. One of the critical aspects to achieving these objectives is to prioritize and increase development.

 

With the mine progressively becoming deeper, rock stresses are increasing, and additional ventilation and cooling will be required. In addition, the current resource estimate indicates that tonnes per vertical meter are diminishing with depth. It remains to be seen if this situation will improve with further exploration. Importantly, with increasing depth, travel times for men and equipment increase significantly and issues around ore and waste movement from the lower levels of the mine to the hoisting shaft or distant stope voids (in the case of waste rock) require coordinated planning and management.

 

Paste fill is delivered underground via a single borehole from surface. A second borehole would reduce the risk of interruptions to the delivery of fill and is being considered by CMPL.

 

Over recent years, there has been a trend towards falling head grade delivered to surface. Undiluted grade reconciliation appears reasonable, but overbreak/underbreak performance and the resulting dilution and ore losses appear to be worsening. Mobile equipment utilization has been poor and CSA management has recognised that mine planning, sequencing and scheduling of stoping operations need improvement. BDA considers that all these factors can be better managed and provide opportunity for MAC.

   

Processing

Low Risk

Processing risk is low; the plant has a long operating history, and the ore has proved to have relatively consistent metallurgical characteristics.  Recoveries are good and concentrate grades are as expected for a largely chalcopyrite deposit.  There are no material deleterious elements.  Short term, there could be some delays experienced during the grinding mill upgrades, which may temporarily restrict throughput and delay expected unit cost improvements.  Processing costs could be affected by higher energy costs related to expected higher fuel costs worldwide.  Labour problems have been experienced necessitating hiring of contract personnel and this is likely to continue.   
   

Infrastructure and Logistics

Low Risk

Access to the mine is by sealed roads and a rail line which connect to national road and rail networks.  Power and water supply facilities utilize standard technology and present no significant technical challenges.  Administration and communications facilities are relatively straightforward as are the arrangements for the export of concentrate product through the Port of Newcastle.
   

Tenement and Title

Low Risk

The political environment in New South Wales remains generally positive to new mining developments and tenement and title approvals to date have been forthcoming as required.  Given that the key project mining tenure is in place and environmental development approval has previously been granted, BDA considers that the risk due to tenement or title issues is low.
   

Project Approvals

Low Risk

Mining projects in NSW (including expansions or modifications of existing projects) require development consent under the NSW EP&A Act.

 

The earliest statutory development consent held by CMPL for the CSA mine is Local Development Consent No. 31/95 and Amendment 97/98:33 approved by CSC in 1995 and 1998 which permits use of the CSA mine site by CMPL. Subsequent expansions and amendments of mining development at CSA mine have all been assessed and administered by the Cobar Shire Council.

 

Given that the key project approvals are in place and environmental development approval has been granted, BDA considers that the risk due to permitting or government approval issues is low.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 118

 

 

Table 22.3 (Continued)

 

Risk Summary

 

Risk Component Comments
   

Tailings and Waste Management

Low Risk

Tailings Storage

 

Regulatory standards that currently apply to the CSA mine’s STSF are Dam Safety NSW, ANCOLD and the CMPL Protocol 14. Protocol 14 covers both dam safety and environmental aspects of the STSF with a consequence category assessment method based on CDA standards.

 

Based on Dam Safety NSW, ANCOLD and CMPL Protocol 14, the consequence category assigned to the STSF is ‘Significant’. In 2019, Dam Safety NSW updated its Dam Safety Regulation and methodologies, which require all ‘declared dams’ in New South Wales to adhere to the new regulations by 1 November 2021. The STSF is a ‘declared dam’ (Dam ID 497) and regulated by Dam Safety NSW.

 

In summary, the tailings management strategy adopted by CMPL is considered appropriate, and the current design standards used incorporate a risk-based approach as required by local standards. BDA considers that the risk to dam safety is low.

 

Waste Rock

 

Waste rock from underground development is backfilled into mined-out stopes where possible, but any excess is hoisted to surface for storage on waste dumps. Most waste rock is classified as NAF but around 30% of the waste material is classified as PAF rock.

 

All waste rock materials are geochemically tested for issues related to ARD and potential for metal leaching. Only suitable, low risk waste rock material is permitted to be hoisted and stockpiled on the surface. Any geochemically unsuitable materials are integrated into the underground mining activities. BDA considers that the risk of waste rock leaching metals in surface storage facilities is low.

   

Production Schedule

Medium Risk

The expectation of a lower mined head grade through a combination of the general trend to lower copper grades over time and/or through a lowering of the cut-off grade, will need to be offset with higher ore production rates to maintain copper metal delivered to the process plant.

 

Future production from the deeper levels within the CSA mine is expected to be impacted by lower tonnes per vertical meter necessitating high levels of development meters to maintain the same level of production, continued ventilation constraints without further ventilation and cooling upgrades, and increased ore and waste haulage from increasingly lower levels to the underground crusher station and shaft hoisting. This production risk may be in part offset by supplementing ore production from the lower levels with production from new satellite orebodies and upper-level remnant ore.

   

Capital Costs

Medium Risk

The estimating methodology and data used to prepare the capital cost estimates are generally in line with industry standards for feasibility study estimates.

 

The capital cost estimates for the major items of proposed capital works include project contingency allowances of around 10% of the estimates, which is consistent with the industry standard for contingency for a final feasibility study of 10-15%. However, resource project capital cost estimates are commonly subject to a significant risk of overruns even where, as in this case, the estimating data and methodology are reasonable and appropriate.

   

Operating Costs

Medium Risk

Recent direct site operating costs at CSA have been of the order of US$120M per annum for an operation delivering around 1.1-1.2Mtpa to the process plant. BDA recognises that there are reasonable opportunities to improve underground mining productivity, in spite of the longer-term expectation that unit costs will increase due to depth, a slight decline in copper grades and increasing development and ventilation requirements.

 

The MAC financial model assumes operating costs will remain relatively stable over the LOM. BDA considers there is likely to be a progressive increase overall in unit operating costs over the LOM.

 

Concentrate freight and realisation costs are constant in the model, but BDA considers that the freight charges may be underestimated. TC/RC charges will vary annually according to supply/demand and copper price factors.

 

G&A costs are forecast to remain steady with some reductions in unit costs assumed in the financial model based on an increased mine and mill throughput.

 

Forecast concentrate freight charges may be underestimated.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 119

 

 

Table 22.4 (Continued)

 

Risk Summary

 

Risk Component Comments
   

Country and Political Risk

Low Risk

The political environment in New South Wales remains generally positive towards metalliferous mining developments and tenement and title approvals for the CSA mine are all well established.  Given that the CSA mine is well established in a historic mining area of the state and supported within the local community, BDA considers that the risk due to political or government administrative issues is low.

 

22.3Risk Mitigation Factors

 

BDA considers that there are a number of factors which combine to reduce some of the identified risks; the principal amongst these are listed below:

 

·The CSA mine has a long operating history and the Mineral Resource, Mineral Reserve and mine production projections going forward are consistent with past performance.

 

·Annual reconciliation of ore tonnes and grade mined against resource model forecasts provides confidence in the reasonableness of the resource and reserve projections.

 

·The geological, mapping, sampling, assaying and QA/QC procedures are well established and consistent with industry standards. The geological data forms an acceptable basis for Mineral Resource and Mineral Reserve estimation.

 

·The significant backlog of drill hole assaying largely caused by Covid-19 staff shortages has been reduced from over13,000m down to 2,000m as of February 2024, the results of which will be captured in subsequent resource updates.

 

·There is significant exploration upside relating to both the known mineralization systems within the Mining Lease and within the adjacent Exploration Licences covering the extensions of the major CSA mineralized structures.

 

·Preparing mine plans and underground access to remnant ore zones will provide alternate stoping areas in the event of any stoping and congestion issues in the lower levels. There is extensive historical experience with the current and proposed mining methods and the potential risks are well documented. Increased in-mine exploration will assist in reducing future production dependence on QTS North.

 

·The copper ore is generally high grade with no deleterious elements of any consequence. Metallurgical performance is good with consistent recoveries of 97-98% to a high-quality 26-27% Cu concentrate with payable silver.

 

·With the two SAG mills now replaced, operating efficiencies in the plant will improve against historical performance and lead to better plant utilization, presenting opportunities to increase throughput and hence reduce unit operating costs. Increased throughput however will rely on the ability of the mine to deliver increased ore tonnages as well as adequate supplies of process water and power to support expanded operations.

 

·The CSA mine has a long operating history with an experienced and skilled workforce, mostly resident in Cobar. There is strong local community support for the CSA mine operation and CMPL has a positive working relationship with Cobar Shire Council. This is not unexpected, given that the CSA mine is the largest employer in the Cobar region, with approximately 500 employees.

 

·The New South Wales social and political environment appears generally favourable towards metal mining in the Cobar region which is increasingly becoming a metals mining hub in the more remote central-western part of the state.

 

·CMPL has extensive experience in estimating the costs for, and carrying out, capital works at the mine site which mitigates against the risk of significant cost overruns in delivering capital works projects.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 120

 

 

22.4Opportunities

 

BDA considers that there are a number of opportunities to increase Mineral Resources and Mineral Reserves, to increase throughput, to reduce costs and to extend the mine life. In BDA’s opinion, the principal opportunities are:

 

·Extension of the known ore zones down plunge and in-mine exploration for new ore zones within reach of existing mine infrastructure, bringing currently identified adjacent lenses into the mine plan.

 

·Systematic exploration of the surrounding exploration licences with several known mineralized structures providing potential for new discoveries and extensions to mine life.

 

·Undertaking mine planning work to identify and bring more remnant ore into the Mineral Reserve and mine schedule. This will not only provide addition plant feed, but contingent ore sources in the event of any production issues in the deeper areas on the mine.

 

·An extensive capital upgrade program was completed over the course of 2022 and 2023. This provides long-lasting opportunities to benefit from the upgrades to underground ventilation and cooling, an essentially new mobile equipment fleet and SAG mill replacements.

 

·Underground equipment availability is high but utilization is low. Making full use of the equipment available is an obvious area for improved production.

 

·Underground crushing, ore hoisting and process plant capacity are currently under-utilized; an increase in plant treatment rate will be possible with the new grinding mills, providing that the mine is able to deliver the ore and that adequate water and energy is available.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 121

 

 

23Recommendations

 

The CSA mine is an operating mine with a long performance and cost history. In 2023, the operation completed an extensive capital projects program to upgrade the mine ventilation and refrigeration systems, underground mobile equipment and a SAG mill replacement program, which strengthens the asset base and underpins the extended Reserve life of mine. With Stage 10 expansion of the STSF beginning construction in 2024 and completing in 2025, the operation is well placed to maintain focus on ongoing productivity and cost improvements over the coming years.

 

Mine planning, along with capital and operating budgets, have been estimated using actual costs as the underlying basis and include reasonable allowances for on-going mine development, ventilation improvements as well as sustaining asset maintenance and replacement.

 

CSA is the largest employer in the region and maintains strong engagement with the Cobar Shire, the township and the surrounding community. The long Reserve mine life provides CSA with the foundations to continue being a material contributor to the region.

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 122

 

 

24References

  

The principal reports and documents reviewed are listed below.

 

CSA Copper Project Reports

 

·South Spur Rail Services Agreement. South Spur Rail Services Pty Ltd and CMPL. December 2009
·AMC CSA Numerical Modelling - AMC Consultants, May 2012
·CSA Site Water Management Plan - GHD, March 2013
·CSA Mine Southern TSF Mid-2015 Surveillance Report - Golder, October 2015
·CSA Mine Southern TSF Stage 9 Concept Design Summary - Golder, November 2015
·CSA Mine Southern TSF Stage 9 Raise Design Report - Golder, 2017
·Newcastle Shiploader Services Agreement - CMPL and Conports Pty Ltd, January 2017
·ITASCA Mining at Depth Study 2017 - Itasca, December 2017
·CSA Mine Ventilation and Refrigeration Feasibility Study (J18001-R004_Rev01) - BBE Consulting, October 2018
·CSA Environmental Management Plan 2020 - CMPL, 2020
·Offtake Agreement_v5 - Glencore 2020
·District Exploration Overview - CMPL, January 2020
·CSA-MP-05 Ground Control Management Plan - CMPL, July 2020
·CSA Mine Mineral Resource Estimate - CMPL, December 2020
·CSA Mine Mineral Reserve Estimate Report Draft 4 - CMPL, December 2020
·CSA Mine New Tailings Storage Facility Options - Golder, December 2020.
·CSA Regional Exploration - CMPL, January 2021
·CSA Mine Mining Operations Plan (MOP) 2021-2022 v1 - Cobar Management Pty Ltd, March 2021
·CSA Mine Mining Operations Plan 2021-2022_v1 - CMPL, March 2021
·CSA Mine Updated STSF Capacity Assessment - Golder, June 2021
·CSA Mine Southern TSF Tailings Storage Capacity Assessment - Golder, June 2021
·CSA Tenement Audit EOFY2021 Cobar Management Pty Ltd (CMPL) - Hetherington, 2021
·CSA_TSM_004_Review of the In-Situ Principal Stress Magnitude and Directions - CMPL, September 2021
·Information Memorandum, “Project Chariot – Confidential Information Memorandum.pdf” - CMPL, October 2021
·CSA Mine Confidential Information Memorandum - CMPL, October 2021
·2021 Mineral Resource and Mineral Reserve Snapshot CSA Mine - CMPL Copper, November 2021
·CSA Mine LOA Organic Growth through Sustained Exploration - CMPL 2022
·CSA Mine Monthly Reports - CMPL, January 2019 to February 2022
·Independent Technical Review CSA Mine - SRK Consulting Pty Ltd, February 2022
·Metals Acquisition Corp. CSA Mine Investor Presentation - MAC, March 2022
·CSA Mine Yearly Stope Production Reconciliations_2021_Dec spreadsheet - CMPL, March 2022
·CSA Mineral Resource Estimate March 2022 - Cube Consulting Pty Ltd, April 2022
·Exploration Drill Update spreadsheet, CMPL,24Feb29dh2_5pct_For report
·CSA Internal Resource – Reserve Report – CMPL, August 2023
·Reserve Options vs. LOM+Budget spreadsheet – CMPL, April 2024
·20240403_Table 1_JORC_CSA 2023_Review.V4 Draft – CMPL, April 2024

 

General Data

 

·Australasian Code for Reporting of Exploration Results, Mineral Resources and Mineral Reserves – Report of the Australasian Joint Mineral Reserve Committee - Australasian Institute of Mining and Metallurgy, Australian Institute of Geoscientists and Minerals Council of Australia, December 2012 (the JORC Code)
·Regulation S-K Part 229.1300 Disclosure by Registrants Engaged in Mining Operations, Item 1302 Qualified Person, Technical Report Summary and Technical Studies

 

BEHRE DOLBEAR

SEC S-K 1300 Technical Report Summary - CSA Copper Mine, Australia - MAC  April 2024
Behre Dolbear Australia Pty LtdPage 123

 

 

25Reliance on Information Provided by the Registrant

 

This assessment has been based on data, reports and other information made available to BDA by MAC and CMPL and referred to in this report. BDA has been advised that the information is complete as to material details and is not misleading. BDA has relied upon the data provided by MAC, CMPL and their advisors and consultants; BDA is unable to warrant the accuracy and completeness of the data provided by third parties but has found no reason to question the validity, completeness or accuracy of the data provided.

 

BDA has reviewed the data, reports and information provided and has used consultants with appropriate experience and expertise relevant to the various technical requirements. The opinions stated herein are given in good faith. BDA believes that the basic assumptions are factual and correct and the interpretations reasonable.

 

BDA does not accept any liability to any individual, organisation or company and takes no responsibility for any loss or damage arising from the use of this report, or information, data, or assumptions contained therein. With respect to the BDA report and use thereof by MAC, MAC agrees to indemnify and hold harmless BDA and its shareholders, directors, officers, and associates against any and all losses, claims, damages, liabilities or actions to which they or any of them may become subject under any securities act, statute or common law and will reimburse them on a current basis for any legal or other expenses incurred by them in connection with investigating any claims or defending any actions.

 

The report is provided to the Directors, advisors and shareholders of MAC for the purpose of assisting them in assessing the technical issues and associated risks of the project acquisition and should not be used or relied upon for any other purpose. Neither the whole nor any part of this report nor any reference thereto may be included in, or with, or attached to any document or used for any purpose without BDA’s written consent to the form and context in which it appears.

 

BEHRE DOLBEAR