EX-99.1 2 tm2222619d1_ex99-1.htm EXHIBIT 99.1

Exhibit 99.1

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

GROTA DO CIRILO LITHIUM PROJECT

 

Araçuaí and Itinga Regions, Minas Gerais, Brazil

 

Phase 3 Mineral Resource Estimate

 

Prepared for: Sigma Lithium Corporation

 

Prepared by:

 

Homero Delboni Jr., MAusIMM, Promon Engenharia

 

Marc-Antoine Laporte, P.Geo, SGS Canada Inc

 

Jarrett Quinn, P.Eng., Primero Group Americas

 

Porfirio Cabaleiro Rodriguez, (MEng), FAIG, GE21 Consultoria Mineral

 

Brian Talbot, FAusIMM, Rtek Pty Ltd.

 

Effective Date: 30th May 2022

 

Issue Date: 4th August 2022

 

 

21501-REP-PM-001
Page | 1

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

IMPORTANT NOTICE

 

This report was prepared as National Instrument 43-101 Technical Report for Sigma Lithium Corporation (Sigma) by Primero Group Americas Inc. (a subsidiary of Primero Group Ltd), SGS Geological Services, GE21 Consultoria Mineral and Promon Engenharia Ltda. (collectively the Report Authors).  The quality of information, conclusions, and estimates contained herein is consistent with the level of effort involved in the Report Authors' services, based on i) information available at the time of preparation, ii) data supplied by outside sources, and iii) the assumptions, conditions, and qualifications set forth in this report.  This report is intended for use by Sigma subject to terms and conditions of its individual contracts with the Report Authors.  Except for the purpose legislated under Canadian provincial and territorial securities law, any other use of this report by any third party is at that party’s sole risk.

 

21501-REP-PM-001
Page | 2

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table of Contents

 

1 SUMMARY 24
  1.1 Introduction 24
  1.2 Property Description and Location 24
  1.3 Accessibility, Climate, Local Resources,Infrastructure and Physiography 25
  1.4 History 25
  1.5 Geological Setting and Mineralization 25
  1.6 Exploration 26
  1.7 Drilling 27
  1.8 Sample Preparation, Analyses and Security 27
  1.9 Data Verification 29
  1.10 Mineral Processing and Metallurgical Testing 30
  1.11 Mineral Resource Estimates 31
  1.12 Mineral Reserve Estimates 35
  1.13 Mining Methods 38
  1.14 Recovery Methods 39
  1.15 Project Infrastructure 39
  1.16 Market Studies and Contracts 41
  1.17 Environmental Studies, Permitting and Social or Community Impact 42
  1.18 Capital and Operating Costs 45
  1.19 Economic Analysis 47
  1.20 Interpretation and Conclusions 51
  1.21 Recommendations 52
2 INTRODUCTION 53
  2.1 Terms of Reference 53
  2.2 Effective Dates 53
  2.3 Qualified Persons 54
  2.4 Site Visits 54
  2.5 Information Source 54
3 RELIANCE ON OTHER EXPERTS 55
  3.1 Marketing 55
  3.2 Units and Currency 55
  3.3 Environmental, Permitting and Social Licence 55
  3.4 Taxation 56
  3.5 Mineral Tenure 56
4 PROPERTY DESCRIPTION AND LOCATION 57
  4.1 Property Description and Location 57
  4.2 Mineral Tenure 58
  4.3 Surface Rights 62
  4.4 Agreements 62
  4.5 Royalties and Encumbrances 62
  4.6 QP Comment 62
5 ACCESSIBILITY, CLIMATE, LOCAL RESOURCES,INFRASTRUCTURE AND PHYSIOGRAPHY 63
  5.1 Accessibility 63
  5.2 Climate 63
  5.3 Local Resources and Infrastructure 63
  5.4 Physiography 66

 

21501-REP-PM-001
Page | 3

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

6 HISTORY 67
  6.1 Project History 67
  6.2 Production 67
7 GEOLOGICAL SETTING AND MINERALIZATION 68
  7.1 Regional Geology 68
  7.2 Local Geology 68
  7.3 Property Geology 71
8 DEPOSIT TYPES 81
9 EXPLORATION 83
  9.1 Introduction 83
  9.2 Grids and Surveys 83
  9.3 Geological Mapping 83
  9.4 Channel Mapping 83
  9.5 Trench Sampling 85
  9.6 Exploration Potential 86
10 DRILLING 90
  10.1 Introduction 90
  10.2 Drill Type 90
  10.3 Sigma Drilling Campaigns 90
  10.4 Drill Hole Logging 100
  10.5 Recovery 101
  10.6 Drill Surveys 101
  10.7 QP Comment 101
11 SAMPLE PREPARATION, ANALYSES AND SECURITY 102
  11.1 Introduction 102
  11.2 Sampling 102
  11.3 Density Determinations 103
  11.4 Analytical and Test Laboratories 104
  11.5 Sample Preparation and Analysis 104
  11.6 Quality Assurance and Quality Control 105
  11.7 Sample Security 124
  11.8 Sample Storage 124
  11.9 QP Comments 124
12 DATA VERIFICATION 126
  12.1 Drilling Database 126
  12.2 Witness Sampling 126
  12.3 QP Comments 130
13 MINERAL PROCESSING AND METALLURGICAL TESTING 131
  13.1 Xuxa Metallurgical Test work (2018-19) 131
  13.2 Xuxa Metallurgical Test Work (2020-2021) 140
  13.3 Barreiro Metallurgical Test Work (2020-21) 158
14 MINERAL RESOURCE ESTIMATES 174
  14.1 Nezinho do Chicao Deposit 174
  14.2 Xuxa Deposit 184
  14.3 Barreiro Deposit 194
  14.4 Murial Deposit 206
  14.5 Lavra Do Meio Deposit 214

 

21501-REP-PM-001
Page | 4

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

15 MINERAL RESERVE ESTIMATES 225
  15.1 Xuxa Mineral Reserves 225
  15.2 Xuxa Pit Optimization Parameters 226
  15.3 Xuxa Modifying Factors 229
  15.4 Xuxa Pit Optimization Study 234
  15.5 Xuxa Mineral Reserves Statement 240
  15.6 Barreiro Mineral Reserves 241
  15.7 Barreiro Pit Optimization Parameters 242
  15.8 Barreiro Modifying Factors 245
  15.9 Barreiro Pit Optimization Study 249
  15.10 Barreiro Mineral Reserves Statement 254
16 MINING METHODS 255
  16.1 Xuxa Open Pit Mining 255
  16.2 Xuxa Mine Sequencing 266
  16.3 Xuxa Mine Fleet 273
  16.4 Barreiro Open Pit Mining 293
  16.5 Barreiro Mine Sequencing 310
  16.6 Barreiro Mine Fleet 316
17 RECOVERY METHODS 335
  17.1 Processing Overview 335
  17.2 Xuxa Front-End Engineering Design (FEED) Update 335
  17.3 Xuxa Process Plant 336
  17.4 Barreiro Process Plant 345
18 Project Infrastructure 351
  18.2 Roads 354
  18.3 Earthworks and Buried Services 355
  18.4 Water Balance (Storm Water, Water Treatment) xuxa 356
  18.5 Sewage 359
  18.6 Built Infrastructure 359
  18.7 Stockpiles 366
  18.8 Waste Disposal 367
  18.9 Fuel 376
  18.10 Power Supply 376
  18.11 Water Supply 378
  18.12 Compressed Air 378
  18.13 Control Systems 378
  18.14 Communication Systems 379
  18.15 Camps and Accommodation 379
  18.16 Port Facilities 379
19 MARKET STUDIES AND CONTRACTS 381
  19.1 Lithium Demand Forecast 381
  19.2 Lithium Supply Forecast 382
  19.3 Lithium Price Forecast 385
  19.4 Contracts and Off-Take Agreements 386
20 ENVIRONMENTAL STUDIES, PERMITTING AND SOCIAL OR COMMUNITY IMPACT 389
  20.1 Environmental Considerations 389
  20.2 Permitting Considerations 394
  20.3 Social Considerations 397
  20.4 Evaluation of Environmental Impacts and Mitigation Actions 399
  20.5 Waste and Water Management 401
  20.6 Relations with Stakeholders 402
  20.7 Rehabilitation and Closure Planning 403
  20.8 Phase 2 Barreiro Pegmatite Environmental Work 404

 

21501-REP-PM-001
Page | 5

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

21 Capital and Operating Costs – Xuxa (Phase 1) and Barreiro (Phase 2) 415
  21.1 Basis of Estimate 415
  21.2 Work Breakdown Structure 415
  21.3 Estimate Plan 415
  21.4 Capital Cost 417
  21.5 Operating Costs 431
22 ECONOMIC ANALYSIS 439
  22.1 Economic Assumptions 439
  22.2 Phase 1 DFS Economic Analysis 441
  22.3 Phase 2 PFS Economic Analysis 451
  22.4 Phase 1 + Phase 2 PFS Economic Analysis 461
23 ADJACENT PROPERTIES 472
24 OTHER RELEVANT DATA AND INFORMATION 473
  24.1 Schedule for Xuxa Phase 1 473
  24.2 Schedule for Barreiro Phase 2 474
  24.3 Schedule for NDC Phase 3 474
  24.4 Project Execution Plan 474
25 INTERPRETATION AND CONCLUSIONS 478
  25.1 Conclusions 478
  25.2 Risk Evaluation 482
  25.3 Opportunities 483
26 RECOMMENDATIONS 484
  26.1 Geology and Resources 484
  26.2 Xuxa 484
  26.3 Barreiro Project Recommendations 485
  26.4 Nezinho do Chicao Project Recommendations 485
27 REFERENCES 486

 

21501-REP-PM-001
Page | 6

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

List of Tables

 

Table 1-1: NDC Deposit Mineral Resource Estimate 33
Table 1-2 – Xuxa Deposit Mineral Resource Estimate 33
Table 1-3 – Barreiro Deposit Mineral Resource Estimate 34
Table 1-4 – Murial Deposit Mineral Resource Estimate 34
Table 1-5 – Lavra do Meio Deposit Mineral Resource Estimate 35
Table 1-6 – Parameters Used in Xuxa Pit Optimization 36
Table 1-7 – Xuxa Mineral Reserves 36
Table 1-8: Parameters Used in Barreiro Pit Optimization 37
Table 1-9: Barreiro Mineral Reserves 38
Table 1-10 – Xuxa Waste Pile Storage 40
Table 1-11: Barreiro Waste Pile Storage 40
Table 1-12 – Capital Cost Estimate Summary Xuxa 45
Table 1-13: Capital Cost Estimate Summary Barreiro 46
Table 1-14: Xuxa Operating Cost Estimate Summary 46
Table 1-15: Barreiro Operating Cost Estimate Summary 47
Table 1-16 – Base Case After-Tax NPVs 47
Table 1-17: Phase 1 Base Case Scenario Results 48
Table 1-18: Key Phase 1 Technical Assumptions 48
Table 1-19: Phase 2 Base Case Scenario Results 49
Table 1-20: Key Phase 2 Technical Assumptions 50
Table 1-21: Phase 1+2 Base Case Scenario Results 50
Table 1-22: Key Phase 1+2 Technical Assumptions 51
Table 4-1 – Mineral Rights Description 59
Table 4-2 – Property Tenure Summary 61
Table 6-1 – Project History 67
Table 9-1 – Channel Sampling Summary 84
Table 9-2 – Grota do Cirilo Trench Sampling Summary 85
Table 9-3 – Grota do Cirilo Property Prospects 86
Table 9-4 – Genipapo Property Prospects 88
Table 9-5 – Santa Clara Property Prospects 89
Table 10-1 – Total Sigma Drill Holes to April  30, 2022 90
Table 10-2 – Total Xuxa Drilling 90
Table 10-3 – Xuxa Example Drill Intercept Table 91
Table 10-4 – Total Barreiro Drilling 92
Table 10-5 – Barreiro Example Drill Intercept Table 93
Table 10-6 – Total Lavra do Meio Drilling 94
Table 10-7 – Lavra do Meio Example Drill Intercept Table 95
Table 10-8 – Total Murial Drilling 96
Table 10-9 – Murial Example Drill Intercept Table 97
Table 10-10 – Nezinho do Chicao Drilling to December 1, 2021 98
Table 10-11 – Nezinho do Chicao Example Drill Intercept Table 99
Table 10-12 – Total Maxixe Drilling 100
Table 11-1 – Specific Gravity of Lithium-Bearing Pegmatites 103
Table 11-2 – Standard Average Li Values with Analytical Error 105
Table 11-3: Check Assay Original vs Control Samples 111
Table 11-4: Check Assay Original and Control Descriptive Statistics 111
Table 11-5: Standard Average Li Values with Analytical Error 112
Table 11-6: Standard Average Li Values with Analytical Error 119
Table 12-1 – Witness Sample Mineralized Interval Comparison between SGS Geosol and SGS Lakefield 127

 

21501-REP-PM-001
Page | 7

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 12-2 – Witness Sample Original vs Control Differences 128
Table 12-3 – Witness Sample Original and Control Descriptive Statistics 128
Table 13-1 – Chemical Analysis and WRA Results 133
Table 13-2 – Bond Abrasion and Ball Mill Work Index Test Work Summary 133
Table 13-3 – Average UCS and CWi 134
Table 13-4 – Summary of Ore Sorter Test work Results 134
Table 13-5 – Summary of HLS Test Results on Variability Samples 135
Table 13-6 – Coarse Fraction DMS results 136
Table 13-7: DMS Tailings Grades 136
Table 13-8 – Fines Fraction DMS 2nd Pass SG Cut-Points 138
Table 13-9 – Ultra-fine Fraction DMS Results 138
Table 13-10: Variability sample assays 143
Table 13-11: Semi-quantitative XRD analysis of the variability samples 143
Table 13-12: HLS Interpolated stage and global lithium recoveries (6% Li2O concentrate) for each variability sample 144
Table 13-13: Variability Sample 2 Global HLS Results 145
Table 13-14: Variability Sample 3 Global HLS Results 145
Table 13-15: Variability Sample 6 Global HLS Results 146
Table 13-16: Variability Sample 6 Global HLS Results with magnetic separation 146
Table 13-17: DMS and magnetic separation results by size fraction 147
Table 13-18: Var 2 Combined DMS stage results 148
Table 13-19: Var 3 Combined DMS stage results 148
Table 13-20: Var 6 Combined DMS stage results 149
Table 13-21: Var 2 Combined Global DMS results 151
Table 13-22: Var 3 Combined Global DMS results 151
Table 13-23: Var 6 Combined Global DMS results 152
Table 13-24: Summary of 2019 and 2021 DMS and magnetic separation concentrate grade and global recovery (including hypofines fraction) 153
Table 13-25: Estimates of DMS Circuit Recovery 154
Table 13-26: Summary of Global Recovery and Yield at 5.5% Li2O for 9.5 mm Top Size 158
Table 13-27 – Description of Barreiro Variability Samples 160
Table 13-28 – Variability Sample and Composite Sample Assays 160
Table 13-29 – Semi-quantitative XRD analysis of the four variability samples and the composite sample 161
Table 13-30 – Estimates of Lithium Deportment to Spodumene 161
Table 13-31 – HLS Interpolated stage and global lithium recoveries (6% Li2O concentrate) for each crush size 163
Table 13-32 – Semi-Quantitative XRD Analysis for Selected Samples (-10 mm crush size) 165
Table 13-33 – HLS Interpolated Stage and Global Combined Lithium Recoveries (6% Li2O concentrate) for each Variability Sample 165
Table 13-34 – Variability Sample 1 Global HLS Results 166
Table 13-35 – Variability Sample 2 Global HLS Results 166
Table 13-36 – Variability Sample 3 Global HLS Results 167
Table 13-37 – Variability Sample 4 Global HLS Results 167
Table 13-38 – Coarse fraction DMS stage results 169
Table 13-39 – Fines fraction DMS stage results 169
Table 13-40 – Ultrafines fraction DMS stage results 169
Table 13-41 – Global DMS results by size fraction 171
Table 13-42 – Global combined DMS results 171
Table 13-43 – Global combined DMS results with middlings re-crush 171
Table 13-44 – Summary of DMS concentrate grade and recovery 172
Table 13-45 – DMS concentrate semi-quantitative XRD analysis 172

 

21501-REP-PM-001
Page | 8

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 13-46: Barreiro Global Recovery and Yield between 6% and 5.5% Li2O Product Grade 173
Table 14-1: NDC Assay Statistics Inside Mineralized Solids 175
Table 14-2: NDC 1 m Composite Statistics 176
Table 14-3: NDC Resource Block Model Parameters 177
Table 14-4: NDC Pit Optimization Parameters 183
Table 14-5: NDC Deposit Mineral Resource Estimate 184
Table 14-6 – Xuxa Assay Statistics Inside Mineralized Solids 185
Table 14-7 – Xuxa 1 m Composite Statistics 186
Table 14-8 – Xuxa Resource Block Model Parameters 188
Table 14-9 – Xuxa Parameters for Reasonable Prospects for Eventual Economic Extraction 193
Table 14-10 – Xuxa Deposit Mineral Resource Estimate 193
Table 14-11 – Barreiro Assay Statistics Inside Mineralized Solids 196
Table 14-12 – Barreiro 1 m Composite Statistics 196
Table 14-13 – Barreiro Resource Block Model Parameters 198
Table 14-14 – Barreiro Pit Optimization Parameters 204
Table 14-15 – Barreiro Deposit Mineral Resource Estimate 205
Table 14-16 – Murial Assay Statistics Inside Mineralized Solids 206
Table 14-17 – Murial 1 m Composite Statistics 207
Table 14-18 – Murial Resource Block Model Parameters 209
Table 14-19 – Murial Parameters for Reasonable Prospect for Eventual Economic Extraction 213
Table 14-20 – Murial Deposit Mineral Resource Estimate 213
Table 14-21 – Lavra do Meio Assay Statistics Inside Mineralized Solids 216
Table 14-22 – Lavra do Meio 1 m Composite Statistics 216
Table 14-23 – Lavra do Meio Resource Block Model Parameters 218
Table 14-24 – Lavro do Meio Parameters for Reasonable Prospect for Eventual Economic Extraction 223
Table 14-25 – Lavra do Meio Deposit Mineral Resource Estimate 223
Table 15-1: Technical and Economic Parameters Used in the Final Xuxa Pit Optimization 227
Table 15-2: Xuxa Geotechnical Pit Slope Design Criteria 228
Table 15-3: Mining Recovery Versus Partial Percentage on Block Height 231
Table 15-4: Xuxa Pit Optimization Results 235
Table 15-5: Xuxa Open Pit Operational Design Parameters 237
Table 15-6: Xuxa Pit Final Optimization Ore and Waste 238
Table 15-7: Xuxa Mineral Reserves 240
Table 15-8: Technical and Economic Parameters Used in the Final Barreiro Pit Optimization 242
Table 15-9: Barreiro Geotechnical Pit Slope Design Criteria 244
Table 15-10: Barreiro Dilution Analysis 248
Table 15-11: Barreiro Nested Pit Optimization Results 250
Table 15-12: Barreiro Open Pit Operational Design Parameters 251
Table 15-13: Barreiro Pit Final Optimization Ore and Waste 253
Table 15-14: Barreiro Mineral Reserves 254
Table 16-1: Xuxa Geotechnical Slope Results Designed Pit 257
Table 16-2: Xuxa Piezometer Locations and Results 261
Table 16-3: Variation of Hydraulic Conductivity and Storage According to Depth 263
Table 16-4: Comparison between Calculated and Adopted Values of K 263
Table 16-5: Calibration Parameters for Calculated vs Observed Head Values 264
Table 16-6: Xuxa Water Levels Reached in the Drawdown Numerical Model Simulation 265
Table 16-7: Simulated Dewatering Streamflow (Annual Average) 265
Table 16-8: Xuxa Designed Mine Sequencing 267
Table 16-9: Xuxa Non-Designed Mine Sequencing 268
Table 16-10: List of Main Equipment to be used in the Operation of the Xuxa Pits 275
Table 16-11: Drilling Equipment for Xuxa Pits 276

 

21501-REP-PM-001
Page | 9

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 16-12: Xuxa Staffing Requirement Summary 279
Table 16-13: Xuxa Preliminary Drill and Blast Plan - Ore 284
Table 16-14: Xuxa Preliminary Drill and Blast Plan – Waste, Soil and Saprolite - Weathered 285
Table 16-15: Xuxa Preliminary Drill and Blast Plan – Waste - Fresh 286
Table 16-16: Xuxa Recommended Drill and Blast Rigs 287
Table 16-17: Xuxa Preliminary Calculations for Drilling Requirements 288
Table 16-18: Xuxa Estimated Annual Consumption of Explosives - Ore 290
Table 16-19: Xuxa Estimated Annual Consumption of Explosives - Waste 291
Table 16-20: Xuxa Estimated Annual Consumption of Explosives – Combined Ore and Waste 292
Table 16-21: Uniaxial Compression Test (UCS) Results Barreiro Pit 295
Table 16-22: Direct Shear Test Results Barreiro Pit 296
Table 16-23: Barreiro Slope Stability Analysis 300
Table 16-24: Barreiro Recommended Pit Slope Geometry 304
Table 16-25: Survey results of groundwater levels in Barreiro exploration drillholes 307
Table 16-26: Depth values of saprolite-fresh rock boundary Barreiro drill holes 308
Table 16-27: Average climatic data for Araçuaí (1981-2010) 310
Table 16-28: Barreiro Designed Mine Sequence 311
Table 16-29: Barreiro Schedule of Primary Mining Equipment 317
Table 16-30: Ore and Waste Production and percentage of material to be blasted Barreiro Pit 318
Table 16-31: Drilling Equipment for Barreiro Pit 319
Table 16-32: Barreiro Staffing Schedule 322
Table 16-33: Barreiro Preliminary Drill and Blast Plan - Ore 328
Table 16-34: Barreiro Preliminary Drill and Blast Plan – Waste 329
Table 16-35: Barreiro Recommended Drill Rig 330
Table 16-36: Barreiro Preliminary Calculations for Drilling Requirements 331
Table 16-37: Barreiro Estimated Annual Consumption of Explosives - Ore 333
Table 16-38: Barreiro Estimated Annual Consumption of Explosives - Waste 333
Table 17-1 – Xuxa Operating Parameters 342
Table 17-2: Xuxa Design Basis and Mass Balance Summary 343
Table 17-3: Xuxa Operating Hours for Main Facilities 344
Table 17-4: Barreiro Operating Parameters 349
Table 17-5: Barreiro Design Basis and Mass Balance Summary 349
Table 18-1 – Infrastructure Summary Table 360
Table 18-2 – Infrastructure Summary Table 362
Table 18-3: Xuxa Waste Pile Parameters for Stability Analysis 371
Table 18-4: Safety Factor from Xuxa Waste Pile Stability Analysis 371
Table 18-5: Xuxa Waste Pile Design Parameters 372
Table 18-6: Xuxa Waste Pile Capacities and Surfaces Areas 373
Table 18-7: Barreiro Waste Pile Design Parameters 374
Table 18-8: Barreiro Waste Pile Capacity and Surface Area 374
Table 18-9 – Total Process Plant Power Demand 377
Table 19-1: Delivery Schedule Under the LGES Offtake 386
Table 20-1 – Granted Licences and Leases 390
Table 20-2 – Baseline Studies 391
Table 20-3 – Applicable Environmental Compensation 395
Table 20-4 – Environmental Impact Minimization Measures 399
Table 20-5 – Environmental Impact Minimization Measures 404
Table 21-1 – Quoted Currency Exchange Rates 417
Table 21-2 – Xuxa Concentrator Capital Cost Estimate Summary 418
Table 21-3 Barreiro Concentrator Capital Cost Estimate Summary 421
Table 21-4: Process Plant Material Quantity Summary 424

 

21501-REP-PM-001
Page | 10

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 21-5: Capital Cost Estimate Basis – Process Plant 425
Table 21-6 – Contingency Requirements 427
Table 21-7 – Summary of Tax applied to the CAPEX 429
Table 21-8 – Xuxa Estimated Capital Mining Cost 430
Table 21-9: Barreiro Estimated Capital Mining Cost 431
Table 21-10: Xuxa Concentrator OPEX Processing Cost Summary 431
Table 21-11: Barreiro Concentrator OPEX Processing Cost Summary 431
Table 21-12: Xuxa Processing Plant OPEX Cost Summary Breakdown 432
Table 21-13: Barreiro Processing Plant OPEX Cost Summary Breakdown 433
Table 21-14: Labour Summary 434
Table 21-15: Xuxa Mining OPEX Costs 438
Table 21-16: Barreiro Mining OPEX Costs 438
Table 22-1 – Base Case After-Tax NPVs 439
Table 22-2: Phase 1 Base Case Scenario Results 441
Table 22-3: Key Phase 1 Technical Assumptions 441
Table 22-4: Phase 1 Estimated Revenue and Operating Costs 443
Table 22-5: Phase 2 Base Case Scenario Results 451
Table 22-6: Key Phase 2 Technical Assumptions 452
Table 22-7: Phase 2 Estimated Revenue and Operating Costs 453
Table 22-8: Phase 1+2 Base Case Scenario Results 461
Table 22-9: Key Phase 1+2 Technical Assumptions 462
Table 22-10: Phase 1+2 Estimated Revenue and Operating Costs 463
Table 24-1 – Major Contracts List 475
Table 25-1 – CAPEX Summary Xuxa 481
Table 25-2: CAPEX Summary Barreiro 481
Table 25-3 – Xuxa Operating Cost Estimate Summary 482
Table 25-4: Barreiro Operating Cost Estimate Summary 482

 

21501-REP-PM-001
Page | 11

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

List of Figures

 

Figure 2-1 – Project Location 53
Figure 4-1 – Project Properties - Genipapo, Grota do Cirilo, Santa Clara and São José 57
Figure 4-2 – Project Mineral Rights, North and South Complexes 60
Figure 5-1 – Aerial View, Current Project Infrastructure 64
Figure 5-2 – Field Office (location 6 in Figure 5-2) 64
Figure 5-3 – SMSA Pilot Plant 65
Figure 5-4 – Lithium Metallurgical Test Phase Production Plant 65
Figure 5-5 – Photo Showing Typical Vegetation Within Project Area 66
Figure 7-1 – Regional Geologic Map (after Pedrosa-Soares et al., 2001) 69
Figure 7-2 – Local Geology Map, Northern Complex 70
Figure 7-3 – Historic Workings and Pegmatite Dike Swarms within Grota Do Cirilo Property 71
Figure 7-4 – Xuxa Cross Section (looking northeast) 72
Figure 7-5 – Barreiro Cross Section (looking northeast) 73
Figure 7-6 – Lavra do Meio Cross Section (looking north) 74
Figure 7-7 – Nezinho Do Chicao Cross Section (looking northeast) 75
Figure 7-8 – Murial Cross Section (looking north) 76
Figure 7-9 – Historical Workings within São José Property 77
Figure 7-10 – Macro Crystals at Lavra Ramon 78
Figure 7-11 – Samambaia Plan Map 79
Figure 7-12 – Ananias Plan Map 80
Figure 8-1 – Generalized Schematic Representation LCT Pegmatite 82
Figure 9-1 – Grota do Cirilo Satellite Image 84
Figure 9-2 – Channel Samples at Murial Mine 85
Figure 10-1 – Plan View of the Drilling at Xuxa (2017 blue collars and 2018 black collars) 91
Figure 10-2 – Longitudinal View of the Drilling at Xuxa 92
Figure 10-3 – Plan View of the Drilling at Barreiro 93
Figure 10-4 – Longitudinal View of the Drilling at Barreiro 94
Figure 10-5 – Plan View of the Drilling at Lavra do Meio 95
Figure 10-6 – Longitudinal View of the Drilling at Lavra do Meio 96
Figure 10-7 – Plan View of the Drilling at Murial 97
Figure 10-8 – Longitudinal View of the Drilling at Murial 98
Figure 10-9 – Plan View of the Drilling at Nezinho do Chicao 99
Figure 10-10: Longitudinal View of the Drilling at Nezinho do Chicao 99
Figure 10-11 – Maxixe Drill Hole Location Plan 100
Figure 11-1 – Standard Sample Analysis Results for the 2017–2018 Batch with Standard AMIS0338 106
Figure 11-2 – Standard Sample Analyses Results for the 2017–2018 Batch with Standard AMIS0339 106
Figure 11-3 – Standard Sample Analyses Results for the 2017–2018 Batch with Standard AMIS0341 107
Figure 11-4 – Standard Sample Analyses Results for the 2017–2018 Batch with Standard AMIS0342 107
Figure 11-5 – Standard Sample Analyses Results for the 2017–2018 Batch with Standard AMIS0343 108
Figure 11-6 – Standard Sample Analyses Results for the 2017–2018 Batch with Standard AMIS0408 108
Figure 11-7 – Blank Sample Analyses from the 2017–2018 Campaign 109
Figure 11-8 – Scatterplot of Core Duplicates 110
Figure 11-9 – Correlation Between Original Samples and Pulp Duplicates 110
Figure 11-10: Check Assay Correlation Between Original Samples and Pulp Duplicates 111
Figure 11-11: Check Assay Distribution of the Difference Between Original Results and Pulp Duplicates 112
Figure 11-12: Standard Sample Analysis Results for the 2021 Batch with Standard AMIS0341 113
Figure 11-13: Standard Sample Analysis Results for the 2021 Batch with Standard AMIS0342 113
Figure 11-14: Standard Sample Analysis Results for the 2021 Batch with Standard AMIS0343 114
Figure 11-15: Standard Sample Analysis Results for the 2021 Batch with Standard AMIS0408 114

 

21501-REP-PM-001
Page | 12

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Figure 11-16: Blank Sample Analyses from the 2021 Campaign 115
Figure 11-17: Correlation Between 2021 Original Samples and Coarse Duplicates 116
Figure 11-18: Correlation Between 2021 Original Samples and Pulp Duplicates 117
Figure 11-19: 2021 Check Assay Correlation Between SGS Originals and ALS Duplicates 118
Figure 11-20: Check Assay Distribution of the Difference Between SGS Originals and ALS Duplicates 118
Figure 11-21: Standard Sample Analysis Results for the 2021-2022 NDC Batch with Standard AMIS0341 120
Figure 11-22: Standard Sample Analysis Results for the 2021-2022 NDC Batch with Standard AMIS0342 120
Figure 11-23: Standard Sample Analysis Results for the 2021-2022 NDC Batch with Standard AMIS0343 121
Figure 11-24: Standard Sample Analysis Results for the 2021-2022 NDC Batch with Standard AMIS0343 121
Figure 11-25: Blank Sample Analyses from the 2021-2022 NDC Campaign 122
Figure 11-26: Correlation Between 2021-2022 NDC Original Samples and Coarse Duplicates 123
Figure 11-27: Correlation Between 2021-2022 NDC Original Samples and Pulp Duplicates 123
Figure 11-28: 2021-2022 NDC Check Assay Correlation Between SGS Originals and ALS Duplicates 124
Figure 12-1 – Witness Sample Original vs Control Sample Differences 128
Figure 12-2 – Witness Sample Original vs Control Sample Differences Frequency Distribution 129
Figure 12-3 – Witness Sample Original vs Control Sample Differences Correlation Analysis 129
Figure 13-1 – Overview of Typical Stage 1 Test work Flowsheet 131
Figure 13-2 – Sample Preparation Diagram for Stage 1 Variability Samples 132
Figure 13-3 – Effect of Combining Coarse DMS and -3.3 mm Middlings HLS Concentrates 137
Figure 13-4: Xuxa Main Pegmatite and Second Pegmatite Sampled in 2018 141
Figure 13-5: Petalite Distribution (%) in Xuxa Block Model (Plan View Looking North) 142
Figure 13-6: Spodumene Distribution (%) in Xuxa Block Model (Plan View Looking North) 142
Figure 13-7: Comparative Results for 5.5% and 6.0% Li2O Global Recovery for 9.5 mm Top Size 155
Figure 13-8: Relative Increase in Global Li2O Recovery for 9.5 mm Top Size 156
Figure 13-9: Comparative Results for 5.5% and 6.0% Li2O Global Yield for 9.5 mm Top Size 157
Figure 13-10: Relative Increase in Global Li2O Yield for 9.5 mm Top Size 158
Figure 13-11 – Lithium (Li2O) Grade and Localization of the Drill Holes used to produce the Barreiro Variability Samples 159
Figure 13-12 – BWi of the Composite Sample compared to the SGS Database 162
Figure 13-13 – Ai of Var 3 compared to the SGS Database 162
Figure 13-14 – Cumulative Lithium Grade - Stage Recovery Curves for HLS Tests 164
Figure 13-15 – Cumulative Lithium Grade – Global Recovery Curves for HLS Tests 164
Figure 14-1: NDC Drill Hole Collar Locations 175
Figure 14-2: NDC Pegmatite Solid (looking west-northwest) 177
Figure 14-3: NDC Combined Correlogram 178
Figure 14-4: Isometric View of NDC Search Ellipsoids 179
Figure 14-5: Isometric View of the NDC Interpolated Block Model 179
Figure 14-6: Statistical Comparison of NDC Assay, Composite and Block Data 180
Figure 14-7: Comparison NDC Block Values Versus Composites Inside Blocks 181
Figure 14-8: NDC Block Model Classification 182
Figure 14-9: NDC Deposit Mineral Resource Block Grades and Revenue Factor 1 Pit 183
Figure 14-10 – Xuxa Drill Hole Collar Locations 185
Figure 14-11 – Xuxa 1 m Composite Histogram 186
Figure 14-12 – Xuxa Pegmatite Solid (looking southeast) 187
Figure 14-13 – Xuxa Combined Correlogram 188
Figure 14-14 – Isometric View of Xuxa Search Ellipsoids 190
Figure 14-15 – Isometric View of the Xuxa Interpolated Block Model 190
Figure 14-16 – Statistical Comparison of Xuxa Assay, Composite and Block Data 191
Figure 14-17 – Comparison Xuxa Block Values Versus Composites Inside Blocks 191
Figure 14-18 – Xuxa Block Model Classification 192
Figure 14-19 – Barreiro Drillhole Collar Locations 195

 

21501-REP-PM-001
Page | 13

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Figure 14-20 – Barreiro 1 m Composite Histogram 197
Figure 14-21 – Sectional Interpretations of the Barreiro Pegmatite Unit (looking north and west) 198
Figure 14-22 – Barreiro Combined Correlogram 199
Figure 14-23 – Isometric View of Barreiro Search Ellipses 200
Figure 14-24 – Isometric View of the Barreiro Interpolated Block Model 200
Figure 14-25 – Statistical Comparison of Barreiro Assay, Composite and Block Data 201
Figure 14-26 – Barreiro Block Values Versus Composites Inside Those Blocks 201
Figure 14-27 – Barreiro Block Model Classification 203
Figure 14-28: Isometric View Looking Northeast: Barreiro Deposit Mineral Resource Block Grades and Revenue Factor 1 Pit 204
Figure 14-29 – Murial Drill Hole Collar Locations 206
Figure 14-30 – Murial 1 m Composite Histogram 207
Figure 14-31 – Murial Pegmatite Solid (looking west) 208
Figure 14-32 – Isometric View of Murial Search Ellipsoids 210
Figure 14-33 – Isometric View of Murial Interpolated Block Model 210
Figure 14-34 – Statistical Comparison of Murial Assay, Composite and Block Data 211
Figure 14-35 – Murial Block Values Versus Composites Inside Those Blocks 211
Figure 14-36 – Murial Block Model Classification 212
Figure 14-37 – Lavra Do Meio Drill Hole Collar Locations 215
Figure 14-38 – Lavra do Meio 1 m Composite Histogram 217
Figure 14-39 – Lavra do Meio Pegmatite Solid (looking west) 218
Figure 14-40 – Lavra do Meio Combined Correlogram 219
Figure 14-41 – Isometric View of Lavra do Meio Search Ellipses 220
Figure 14-42 – Isometric View of Lavra Do Meio Interpolated Block Model 220
Figure 14-43 – Statistical Comparison of Lavro Do Meio Assay, Composite and Block Data 221
Figure 14-44 – Lavra Do Meio Block Values Versus Composites Inside Those Blocks 221
Figure 14-45 – Lavra Do Meio Block Model Classification 222
Figure 15-1: Final Xuxa Mine Configuration 226
Figure 15-2: Xuxa North and South Pit Geotechnical Sectors 228
Figure 15-3: Grade x Tonnage Curve with Selectivity Results Based on Local Uniform Conditioning Estimate 230
Figure 15-4: Cross-Section Showing the Original Pegmatite (white line) and the One Reduced At 1 M from the Edge (brown line). Blocks are Coloured Blue to Red in Relation to their Partial Percentage within the Reduced Solid (Blue = 0%, Red = 100%) 232
Figure 15-5: Schematic Representation of the Dilution Analysis 232
Figure 15-6: Xuxa Tonnage vs Partial Percentage – Dilution – 5 m 233
Figure 15-7: Tonnage vs Partial Percentage – Dilution – 1 m 233
Figure 15-8: Tonnage vs Partial Percentage – Solid Internal Dilution – 5 m 234
Figure 15-9: Pit by Pit Graph of Optimization Results 236
Figure 15-10: Xuxa Pit Wall Configuration 237
Figure 15-11: Xuxa Pit Ramp Design 238
Figure 15-12: Xuxa Final Optimized Pit Design 239
Figure 15-13: Final Barreiro Mine Configuration 242
Figure 15-14: Barreiro Pit Geotechnical Sectors 244
Figure 15-15: Barreiro Grade x Tonnage Curve with Selectivity Results Based on Local Uniform Conditioning Estimate 246
Figure 15-16: Cross-Section Showing the Original Pegmatite (brown line) and the One Reduced At 1 M from the Edge (white line). Blocks are Coloured Blue to Red in Relation to their Partial Percentage within the Reduced Solid (Blue = 0%, Red = 100%) 247
Figure 15-17: Schematic Representation of the Dilution Analysis 248
Figure 15-18: Barreiro Tonnage vs Partial Percentage Curves 249

 

21501-REP-PM-001
Page | 14

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Figure 15-19: Barreiro Nested Pit Tonnage and NPV 250
Figure 15-20: Barreiro Pit Wall Configuration 252
Figure 15-21: Barreiro Pit Ramp Design 252
Figure 15-22: Barreiro Final Operational Pit Design 253
Figure 16-1: Kinematic Analysis of Sector A, Xuxa North Pit 255
Figure 16-2: Xuxa North Pit, Sector A Stability Analysis, FS=1.47 256
Figure 16-3: Xuxa North Pit, Sector C Stability Analysis, FS=1.56 256
Figure 16-4: Xuxa North and South Pits with Geotechnical Sectors 257
Figure 16-5: Regional Hydrogeological Conceptual Model 258
Figure 16-6: Xuxa North and South Pits Separated by Piaui River 259
Figure 16-7: Potentiometric Map of the Xuxa Pit Region 260
Figure 16-8: Relationship between RQD and Depth Evaluated in the Block Model for the Proposed Pits 262
Figure 16-9: Steady-State Calibration Graph of Calculated vs Observed Head Values 264
Figure 16-10: Equipotential Surface of Groundwater Level in Year-9 Simulation Plan 266
Figure 16-11: Xuxa North and South Pits Year 1 269
Figure 16-12: Xuxa North and South Pits Year 2 270
Figure 16-13: Xuxa North and South Pits Year 3 270
Figure 16-14: Xuxa North and South Pits Year 4 271
Figure 16-15: Xuxa North and South Pits Year 5 271
Figure 16-16: Xuxa North and South Pits Year 6 272
Figure 16-17: Xuxa North and South Pits Year 7 272
Figure 16-18: Xuxa North and South Pits Year 8 273
Figure 16-19: Explosives Magazines in Container 277
Figure 16-20: Example of Ammonium Nitrate Emulsion Storage Structure 278
Figure 16-21: Schematic of Wash Ramp Oil-Water Separator 281
Figure 16-22: Schematic of Solid Waste Temporary Storage Facility 282
Figure 16-23: Image Analysis and Calculation of Granulometric Distribution 293
Figure 16-24: OPTV-derived stereogram showing two main joint structures at Barreiro 295
Figure 16-25: Barreiro Pit Sectorization 296
Figure 16-26: Barreiro kinematic analysis for sector 1 with 5% planar rupture occurring 297
Figure 16-27: Barreiro kinematic analysis for sector 1 with 4% planar rupture occurring 298
Figure 16-28: Barreiro kinematic analysis for sector 3 with 4% planar rupture occurring 298
Figure 16-29: Barreiro kinematic analysis for sector 4 with 4% planar rupture occurring 299
Figure 16-30: Barreiro kinematic analysis for sector 5 with 5% planar rupture occurring 299
Figure 16-31: Barreiro Kinematic analysis for sector 5 with 30% planar rupture occurring 300
Figure 16-32: Analysis of section 01 with FS = 1.92 301
Figure 16-33: Analysis of section 02 with FS = 1.43 301
Figure 16-34: Analysis of section 03 with FS = 1.80 302
Figure 16-35: Analysis of section 04 with FS = 1.99 302
Figure 16-36: Analysis of section 05 with FS = 2.18 303
Figure 16-37: Jequitinhonha River Basin in Minas Gerais state, Brazil 305
Figure 16-38: Route map and drainage points inspected in the Barreiro area 306
Figure 16-39: Drill hole locations and potentiometric map of the Barreiro area 307
Figure 16-40: Barreiro geotechnical drill hole locations 309
Figure 16-41: Barreiro Pit Year 1 312
Figure 16-42: Barreiro Pit Year 2 312
Figure 16-43: Barreiro Pit Year 3 313
Figure 16-44: Barreiro Pit Year 4 313
Figure 16-45: Barreiro Pit Year 5 314
Figure 16-46: Barreiro Pit Year 6 314
Figure 16-47: Barreiro Pit Year 10 315

 

21501-REP-PM-001
Page | 15

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Figure 16-48: Barreiro Pit Year 12 315
Figure 16-49: Explosives Magazines in Container 320
Figure 16-50: Example of Ammonium Nitrate Emulsion Storage Structure 321
Figure 16-51: Schematic of Wash Ramp Oil-Water Separator 325
Figure 16-52: Schematic of Solid Waste Temporary Storage Facility 326
Figure 16-53: Image Analysis and Calculation of Granulometric Distribution 334
Figure 17-1: Xuxa Process Plant 337
Figure 17-2: Block Flow Diagram for Xuxa Crushing Circuit and DMS Plant 338
Figure 17-3: Sigma Crushing and DMS Plant Overview 339
Figure 17-4: Sigma Primary Crushing Facility and Crushed Ore Bin 340
Figure 17-5: Sigma Xuxa DMS Plant and Product Stockpiles 341
Figure 17-6: Xuxa and Barreiro Process Plant Layout (2021 Design) 345
Figure 17-7: Block Flow Diagram for the Barreiro Crushing Circuit and DMS Plant 347
Figure 18-1– Sigma Lithium Project General Layout Plan for Xuxa 352
Figure 18-2– Overall Site Plan 353
Figure 18-3: Schematic of the proposed municipal road upgrades 354
Figure 18-4: Proposed municipal access road and community bypass road 354
Figure 18-5 – Proposed Bridge Location Xuxa Mine 355
Figure 18-6 – Xuxa Mine Water Balance 357
Figure 18-7 – Intake Water / Water Treatment 359
Figure 18-8: Conceptual Representation of Workshop Areas 366
Figure 18-9: Xuxa Waste Piles Location Map 368
Figure 18-10: Xuxa Waste Piles Geotechnical Sampling Locations 369
Figure 18-11: Constructive Sequencing of the 340 M Level of the Waste Pile Berm 370
Figure 18-12: Stability Analysis Section AA for Xuxa Waste Pile 03 372
Figure 18-13: Proposed Location of Barreiro Waste Dump 373
Figure 18-14: Final Mine Configuration Showing Xuxa and Barreiro Pits and Sigma Processing Plant 375
Figure 18-15 – Product Transport Routing from Xuxa to Ilhéus 380
Figure 19-1: Lithium Supply-Demand Forecast 381
Figure 19-2: Lithium Demand Breakdown by End-Use 2022 382
Figure 19-3: Electric Vehicle Sales as a Share of Total Cars 382
Figure 19-4: Lithium Feedstock Supply Forecast 383
Figure 19-5 Lithium Chemical Supply Breakdown 383
Figure 19-6: Long-Term Supply C1 Lithium Carbonate Cost Curve 384
Figure 19-7: Battery-Grade Lithium Chemical Price Forecast 385
Figure 19-8: Spodumene Price Forecast 385
Figure 20-1 – Location of Areas of Interest and Properties 396
Figure 20-2: Sigma Wildlife Rehabilitation Centre and Seedling Nursery 401
Figure 20-3: Avifauna: A) Nest of Red Ovenbird; individual of B) Red-Cowled Cardinal, C) Grassland Sparrow; D) Smooth-billed Ani; E) Rufous-collared Sparrow; F) Tropical Kingbird; G) Burrowing Owl and H) Yellow-chevroned Parakeet. 407
Figure 20-4: Herpetofauna: A) Neotropical Ameiva, B) Tropidurus oreadicus, C) Leptodactilus fuscus; D) Tegu; E) Rhinella granulosa and F) Rhinellaschneideri. 407
Figure 20-5: Terrestrial mammalian fauna: A) wild dog; B) skunk; C) big-eared opossums; and D) footprint of Procyon cancrivorus. 408
Figure 20-6 – Project Status Plan with Mining Applications 409
Figure 22-1: Spodumene Concentrate Price Forecast 440
Figure 22-2: Phase 1 After-Tax Cash Flow and Cumulative Cash Flow Profile @ 6.0% SC 444
Figure 22-3: Phase 1 After-Tax Cash Flow and Cumulative Cash Flow Profile @ 5.5% SC 444
Figure 22-4: Phase 1 After-Tax Cash Flow and Cumulative Cash Flow Profile @ 5.2% SC 444
Figure 22-5 : Phase 1 Financial Model Summary @ 6.0% SC 445

 

21501-REP-PM-001
Page | 16

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Figure 22-6: Phase 1 Financial Model Summary @ 5.5% SC 446
Figure 22-7: Phase 1 Financial Model Summary @ 5.2% SC 447
Figure 22-8: Phase 1 6.0% SC After-Tax NPV Sensitivity Analysis (US$ B) 448
Figure 22-9: Phase 1 5.5% SC After-Tax NPV Sensitivity Analysis (US$ B) 449
Figure 22-10: Phase 1 5.2% SC After-Tax NPV Sensitivity Analysis (US$ B) 449
Figure 22-11: Phase 1 6.0% SC After-Tax IRR Sensitivity Analysis (US$ B) 450
Figure 22-12: Phase 1 5.5% SC After-Tax IRR Sensitivity Analysis (US$ B) 450
Figure 22-13: Phase 1 5.2% SC After-Tax IRR Sensitivity Analysis (US$ B) 451
Figure 22-14: Phase 2 After-Tax Cash Flow and Cumulative Cash Flow Profile @ 6.0% SC 454
Figure 22-15: Phase 2 After-Tax Cash Flow and Cumulative Cash Flow Profile @ 5.5% SC 454
Figure 22-16: Phase 2 After-Tax Cash Flow and Cumulative Cash Flow Profile @ 5.2% SC 454
Figure 22-17: Phase 2 Financial Model Summary @ 6.0% SC 455
Figure 22-18: Phase 2 Financial Model Summary @ 5.5% SC 456
Figure 22-19: Phase 2 Financial Model Summary @ 5.2% SC 457
Figure 22-20: Phase 2 6.0% SC After-Tax NPV Sensitivity Analysis (US$ B) 458
Figure 22-21: Phase 2 5.5% SC After-Tax NPV Sensitivity Analysis (US$ B) 459
Figure 22-22: Phase 2 5.2% SC After-Tax NPV Sensitivity Analysis (US$ B) 459
Figure 22-23: Phase 2 6.0% SC After-Tax IRR Sensitivity Analysis (US$ B) 460
Figure 22-24: Phase 2 5.5% SC After-Tax IRR Sensitivity Analysis (US$ B) 460
Figure 22-25: Phase 2 5.2% SC After-Tax IRR Sensitivity Analysis (US$ B) 461
Figure 22-26: Phase 1+2 After-Tax Cash Flow and Cumulative Cash Flow Profile @ 6.0% SC 464
Figure 22-27: Phase 1+2 After-Tax Cash Flow and Cumulative Cash Flow Profile @ 5.5% SC 464
Figure 22-28: Phase 1+2 After-Tax Cash Flow and Cumulative Cash Flow Profile @ 5.2% SC 464
Figure 22-29: Phase 1+2 Financial Model Summary @ 6.0% SC 465
Figure 22-30: Phase 1+2 Financial Model Summary @ 5.5% SC 466
Figure 22-31: Phase 1+2 Financial Model Summary @ 5.2% SC 467
Figure 22-32: Phase 1+2 6.0% SC After-Tax NPV Sensitivity Analysis (US$ B) 468
Figure 22-33: Phase 1+2 5.5% SC After-Tax NPV Sensitivity Analysis (US$ B) 469
Figure 22-34: Phase 1+2 5.2% SC After-Tax NPV Sensitivity Analysis (US$ B) 469
Figure 22-35: Phase 1+2 6.0% SC After-Tax IRR Sensitivity Analysis (US$ B) 470
Figure 22-36: Phase 1+2 5.5% SC After-Tax IRR Sensitivity Analysis (US$ B) 470
Figure 22-37: Phase 1+2 5.2% SC After-Tax IRR Sensitivity Analysis (US$ B) 471
Figure 24-1: Xuxa Schedule 473

 

21501-REP-PM-001
Page | 17

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

CERTIFICATE OF AUTHOR

HOMERO DELBONI JR

 

I, Homero Delboni Jr, B.E., M.Eng.Sc., Ph.D., of São Paulo, Brazil, do hereby certify:

 

1.I am a Senior Consultant of HDA Serviços S/S Ltda., Alameda Casa Branca, 755 cj. 161 Sao Paulo, SP 01408-001 Brazil

2.This certificate applies to the Technical Report entitled “Grota do Cirilo Lithium Project, Aracuai and Itinga Regions, Minas Gerais, Brazil – Phase 3 Mineral Resource Estimate” with an effective date of 30th May 2022.

3.I graduated with a Bachelor of Engineering Degree in Mining and Minerals Processing from The University of Sao Paulo (Brazil) in 1983, concluded a Masters in Engineering in Minerals Processing in The University of Sao Paulo (Brazil) in 1989 and obtained a Ph.D. in Minerals Processing Engineering at The University of Queensland – Julius Kruttschnitt Mineral Research Centre, Brisbane (Australia) in 1999.

4.I am a Member (#112813) and Chartered Professional in Metallurgy of the Australian Institute of Mining and Metallurgy – MAusIMM – CP (Metallurgy). I have worked as a Minerals Processing engineer for a total of 39 years since my graduation from university.

5.I have read the definition of Qualified Person set out in the National Instrument 43-101 (Instrument) and certify that by reason of my education, affiliation with a professional association and past relevant work experiences, I fulfil the requirement to be an independent qualified person for the purposes of NI 43-101.

6.I have read NI 43-101 and I have participated in the preparation of this Technical Report, and I am responsible for Section 18, excluding sub-sections 18.4.2, 18.4.4.2, 18.8 and 18.8.8.1.2, which have been prepared in compliance with NI 43-101.

7.I am independent of Sigma Lithium Resources Corporation as defined by Section 1.5 of the Instrument. I do not have prior involvement with the properties that are the subject of the technical report.

8.As of the effective date of the Technical Report, to the best of my knowledge, information and belief, the sections of the technical report for which I am responsible contain all scientific and technical information that is required to be disclosed to make the technical report not misleading.

 

Signed and dated this 4th August 2022 at São Paulo, SP - Brazil.

 

“Signed and sealed” Homero Delboni Jr, Ph.D., MAusIMM

 

  
Homero Delboni Jr, B.E., M.Eng.Sc., Ph.D., MAusIMM – CP (Metallurgy) 
Senior Consultant, Promon Engenharia, MAusIMM #112813 

 

21501-REP-PM-001
Page | 18

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

CERTIFICATE OF AUTHOR
MARC-ANTOINE LAPORTE

 

I, Marc-Antoine Laporte, P.Geo., M.Sc., of Québec, Québec, do hereby certify:

 

1.I am a senior geologist with SGS Canada Inc (Geological Services) with a business address at 125 rue Fortin, Suite 100, Quebec City, Quebec, G1M 3M2.

2.This certificate applies to the Technical Report entitled “Grota do Cirilo Lithium Project, Aracuai and Itinga Regions, Minas Gerais, Brazil – Phase 3 Mineral Resource Estimate” with an effective date of 30th May 2022.

3.I am a graduate of Université Laval (2004 and 2008) in Earth Sciences. I am a member in good standing of Ordre des Géologues du Québec (#1347). I have worked as a geologist continuously since my graduation.

4.I have read the definition of Qualified Person set out in the National Instrument 43-101 (NI 43-101) and certify that by reason of my education, affiliation with a professional association and past relevant work experiences, I fulfil the requirement to be an independent qualified person for the purposes of NI 43-101.

5.My most recent personal inspection of the Project was on May 30 to June 1st, 2022.

6.I have read NI 43-101 and I have participated in the preparation of this Technical Report and am responsible for Sections 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 14, 23 and the applicable parts of sections 1, 2, 25, 26 and 27, each of which has been prepared in accordance with NI 43-101.

7.I am independent of Sigma Lithium Corporation as defined by Section 1.5 of the Instrument. I don’t have any prior involvement with the property that is the subject of the technical report.

8.As of the effective date of the Technical Report, to the best of my knowledge, information and belief, the sections of the technical report for which I am responsible contain all scientific and technical information that is required to be disclosed to make the technical report not misleading.

 

Signed and dated this 4th August 2022 at Quebec City, Quebec.

 

“Signed and sealed” Marc-Antoine Laporte, P.Geo., M.Sc

 

  
Marc-Antoine Laporte, P.Geo., Senior Geologist 
SGS Canada Inc 

 

21501-REP-PM-001
Page | 19

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

CERTIFICATE OF AUTHOR

JARRETT QUINN

 

I, Jarrett Quinn, P.Eng., Ph.D., of Montréal, Québec, do hereby certify:

 

1.I am a Consulting Process Engineer for Primero Group Americas Inc. with a business address at 1450 - 1801 McGill College, Montréal, Québec, H3A 2N4.

2.This certificate applies to the Technical Report entitled “Grota do Cirilo Lithium Project, Aracuai and Itinga Regions, Minas Gerais, Brazil – Phase 3 Mineral Resource Estimate” with an effective date of 30th May 2022.

3.I am a graduate of McGill University (B.Eng. 2004, M.Eng. 2006, and Ph.D 2014) in Metallurgical Engineering. I am a member in good standing of the Ordre des Ingénieurs du Québec (#5018119). I have worked as a metallurgist since 2006.

4.I have read the definition of Qualified Person set out in the National Instrument 43-101 (Instrument) and certify that by reason of my education, affiliation with a professional association and past relevant work experiences, I fulfil the requirement to be an independent qualified person for the purposes of NI 43-101.

5.I have read NI 43-101 and have participated in the preparation of this Technical Report. I am responsible for Section 13 (Mineral Processing and Metallurgical Testing) excluding sections 13.2.7 and 13.3.7 and am responsible for Chapter 17 (Recovery Methods), which have been prepared in accordance with NI 43-101.

6.I am independent of Sigma Lithium Resources Corporation as defined by Section 1.5 of the Instrument. I do not have prior involvement with the properties that are the subject of the technical report.

7.As of the effective date of the Technical Report, to the best of my knowledge, information and belief, the sections of the technical report for which I am responsible contain all scientific and technical information that is required to be disclosed to make the technical report not misleading.

 

Signed and dated this 4th August 2022 at Montréal, Quebec.

 

“Signed and sealed” Jarrett Quinn

 

  
Jarrett Quinn, P.Eng. (OIQ #5018119), Ph.D., Consulting Process Engineer, 
Primero Group Americas Inc. 

 

21501-REP-PM-001
Page | 20

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

CERTIFICATE OF AUTHOR
PORFÍRIO CABALEIRO RODRIGUEZ

 

I, Porfirio Cabaleiro Rodriguez, P.Eng., Ph.D., do hereby certify:

 

1.I am a Mining Engineer and Director for GE21 Consultoria Mineral, located at Avenida Afonso Pena, 3130 − 12º andar, Belo Horizonte, MG, Brazil, CEP 30.130-910.

2.This certificate applies to the Technical Report entitled “Grota do Cirilo Lithium Project, Aracuai and Itinga Regions, Minas Gerais, Brazil – Phase 3 Mineral Resource Estimate” with an effective date of 30th May 2022 (Technical Report).

3.I am a graduate in Mining Engineering from the Federal University of Minas Gerais, in Belo Horizonte, Brazil. I have worked as a Mining Engineer for more than 42 years.

4.I am a Fellow of the Australian Institute of Geoscientists (FAIG #3708).

5.I have read the definition of Qualified Person set out in the National Instrument 43-101 (Instrument) and certify that by reason of my education, affiliation with a professional association and past relevant work experiences, I fulfil the requirement to be an independent qualified person for the purposes of NI 43-101.

6.I visited the site between April 17-18, 2019.

7.I have read NI 43-101 and have participated in the preparation of this Technical Report and am responsible for Sections 15, 16, 18.4.2, 18.4.4.2, 18.8, 18.8.1.2, 19, 20, 21.1, 21.2, 21.3 and 24, and the applicable parts of 1, 25 and 26, each of which has been prepared in accordance with NI 43-101.

8.I am independent of Sigma Lithium Corporation as defined by Section 1.5 of the Instrument. I do not have prior involvement with the properties that are the subject of the technical report.

9.As of the effective date of the Technical Report, to the best of my knowledge, information and belief, the sections of the technical report for which I am responsible contain all scientific and technical information that is required to be disclosed to make the technical report not misleading.

 

Signed and dated this 4th August 2022, at Belo Horizonte, Minas Gerais State.

 

“Signed and sealed” Porfirio Cabaleiro Rodriguez, BSc. (MEng), FAIG

 

   
Porfirio Cabaleiro Rodriguez, BSc. (MEng)
Senior Director GE21, FAIG #3708
 

 

21501-REP-PM-001
Page | 21

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

CERTIFICATE OF AUTHOR
BRIAN TALBOT

 

I, Brian Talbot, FAusIMM, do hereby certify:

 

1.I am a Consulting Process Engineer for Rtek Pty LTD. with a business address at 33 Richardson St West Perth.

2.This certificate applies to the Technical Report entitled “Grota do Cirilo Lithium Project, Aracuai and Itinga Regions, Minas Gerais, Brazil – Phase 3 Mineral Resource Estimate” with an effective date of 30th May 2022 (Technical Report).

3.I am a graduate of the University of the Witwatersrand (BSc Engineer Chemical) and I am a member in good standing of AusIMM (#3001296). I have worked as a chemical engineer since 1994.

4.I have read the definition of Qualified Person set out in the National Instrument 43-101 (Instrument) and certify that by reason of my education, affiliation with a professional association and past relevant work experiences, I fulfil the requirement to be an independent qualified person for the purposes of NI 43-101.

5.I have read NI 43-101 and have participated in the preparation of this Technical Report and am responsible for Sections 13.2.7, 13.3.7, 21 and 22, each of which has been prepared in accordance with NI 43-101.

6.I am independent of Sigma Lithium Corporation as defined by Section 1.5 of the Instrument. I do not have prior involvement with the properties that are the subject of the technical report.

7.As of the effective date of the Technical Report, to the best of my knowledge, information and belief, the sections of the technical report for which I am responsible contain all scientific and technical information that is required to be disclosed to make the technical report not misleading.

 

Signed and dated this 4th August 2022, at Perth, Western Australia.

 

“Signed and sealed” Brian Talbot, FAusIMM

 

   
Brian Talbot, FAusIMM  

 

21501-REP-PM-001
Page | 22

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Abbreviations

 

AMIS African Mineral Standards
CAPEX Capital Expenditures
CIM Canadian Institute of Mining, Metallurgy and Petroleum
DMS Dense Medium Separation
EPCM Engineering Procurement Construction Management
FOB Free on Board
FS Feasibility Study
GE21 GE21 Mineral Consultants
HDPE High Density Polyethylene
HLS Heavy Liquid Separation
HMI Human Machine Interface
LOM Life of Mine
MEL Mechanical Equipment List
MTO Material Take-off
NPI Non-Process Infrastructure
NPV Net Present Value
OPEX Operating Expenditures
PEP Project Execution Plan
Primero Primero Group Americas Inc
Project Grota do Cirilo Lithium Project
Promon Promon Engenharia Ltda
Property Sigma Property
RFQ Request for Quotation
ROM Run of Mine
SC Spodumene Concentrate
Sigma Sigma Lithium Corporation
SGS SGS Geological Services (SGS Canada)
UCS Unconfined Compressive Strength
UPS Uninterruptible Power Supply
WBS Work Breakdown Structure

 

21501-REP-PM-001
Page | 23

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

1SUMMARY

 

1.1Introduction

 

Sigma Lithium Corporation (Sigma) requested SGS Geological Services (SGS) to prepare a NI 43-101 Technical Report (the Report) on Sigma’s Grota do Cirilo project located in Minas Gerais State, Brazil.

 

This report contains the Phase 3 Mineral Resource Estimate (MRE) for the Nezinho do Chicao pegmatite.

 

Sigma Mineração S.A. (SMSA) is the Brazilian subsidiary of Sigma and is the owner of the mining rights and the holder of mining concessions ordinance which includes the Xuxa, Barrerio, Murial, Lavra do Meio and Nezinho do Chicao deposits.

 

The Report supports the disclosure by Sigma in the news release dated 22nd June 2022.

 

Mineral Resources and Mineral Reserves (MRMR) are reported using the 2014 Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Definition Standards (2014 CIM Definition Standards) and adhere to the 2019 CIM Estimation of Mineral Resources & Mineral Reserves Best Practice Guidelines (2019 CIM MRMR Guidelines).

 

1.2Property Description and Location

 

The Project is located in Northeastern Minas Gerais State, in the municipalities of Araçuaí and Itinga, approximately 25 km east of the town of Araçuaí and 450 km northeast of Belo Horizonte.

 

The Project is comprised of four properties owned by SMSA and is divided into the Northern Complex (the Grota do Cirilo, Genipapo and Santa Clara properties) and the Southern Complex (the São José property).

 

The Project consists of 27 mineral rights, which include mining concessions, applications for mining concessions and exploration permits, spread over 191 km2, and includes nine past producing lithium mines and 11 first-priority exploration targets. Granted mining concessions are in good standing with the Brazilian authorities.

 

The surface rights in the Grota do Cirilo area, the current primary focus of activity, are held by two companies, Arqueana Minérios e Metais (Arqueana) and Miazga Participações S.A. (Miazga). SMSA has entered into two right-of-way agreements with these companies to support Sigma’s exploration and development activities within the Grota do Cirilo property, as well as third-party surface owners.

 

Sigma has been issued both the Environment Provisional License and the Environment Installation License (LP&LI) and construction on Phase 1 of the project has commenced. Sigma has also been granted a Water License to pump of 150 m3/h of water from the Jequitinhonha River for all months of the year for a period of 10 years after which the license can be renewed.

 

The Brazilian Government levies a Compensação Financeira pela Exploração de Recursos Minerais (CFEM) royalty on mineral production. Lithium production is subject to a 2.0% CFEM royalty, payable on the gross income from sales. The Project is subject to two third-party net smelter return (NSR) royalties of 1% each however, Sigma intends to exercise its option to repurchase one of the 1.0% NSRs for US$3.8 million in its first year of commercial production at the Project.

 

To the extent known to the QPs, there are no other significant factors and risks that may affect access, title, or the right or ability to perform work on the Project that have not been discussed in this Report.

 

21501-REP-PM-001
Page | 24

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

1.3Accessibility, Climate, Local Resources, Infrastructure and Physiography

 

The Project is easily accessible from regional paved road BR-367, which runs through the northern part of the Project. Within the Project area, accessibility is provided by a network of maintained arterial and back country service roads. A municipal airport services the town of Araçuaí. The closest major domestic airport is located at Montes Claros, 327 km west of Araçuaí.

 

The Eastern Brazil region is characterized by a dry, semi-arid and hot climate. It is expected that future mining operations could be conducted year-round. Exploration activities are year-round but can be interrupted by short-term rainfall events.

 

Mining operations have been previously conducted in the Project area. Existing infrastructure includes power supply and substation, an extensive office block equipped with internet and telephones, accommodation for 40 persons on site, dining hall and kitchen, workshop, on-site laboratory and sample storage building, warehouse and a large store, a fuel storage facility with pumping equipment, and a water pumping facility from the Jequitinhonha River with its reservoir. The main 138 kV transmission line from the Irape hydro power station runs through the northern part of the Project area. The town of Araçuaí can supply basic services. Other services must be sourced from Belo Horizonte or São Paulo.

 

The topography consists of gently rolling hills with less than 100 m difference in elevation. The Project area typically hosts thorn scrub and savannah. Much of the area has been cleared for agriculture. The primary source of water for this project is the Jequitinhonha River.

 

1.4History

 

Exploration and mining activities prior to Sigma’s project interest were conducted by Companhia Estanìfera do Brazil (CEBRAS), Arqueana Minérios e Metais (Arqueana), Tanex Resources plc (Tanex; a subsidiary of Sons of Gwalia Ltd (Sons of Gwalia)), and RI-X Mineração S.A. (RI-X). CEBRAS produced a tin/tantalite concentrate from open pit mines from 1957 to the 1980s. Arqueana operated small open pit mines from the 1980s to the 2000s, exploiting pegmatite and alluvial gravel material for tin and tantalite. Tanex Resources obtained a project interest from Arqueana, and undertook channel sampling, air-track, and reverse circulation (RC) drilling. The Project was subsequently returned to Arqueana. In 2012, RI-X obtained a controlling interest in Arqueana, and formed a new subsidiary company to Arqueana called Araçuaí Mineração whose name was later changed to SMSA. SMSA completed mapping, data compilation, a ground magnetic survey, channel sampling, and HQ core drilling. A heavy mineral separation (HMS) pilot plant was built during 2014–2015. Lithium-specific mining activities were conducted over at least five deposits in the Northern Complex, and four deposits in the Southern Complex.

 

In 2017 Sigma purchased a dense media separation (DMS) unit to produce a 6% Li2O spodumene concentrate. Sigma has completed ground reconnaissance, satellite image interpretation, geological mapping, channel and chip sampling, trenching, core drilling, Mineral Resource and Mineral Reserve estimation, and a feasibility study. Sigma initially focused on a geological assessment of available field data to prioritize the 200 known pegmatites that occur on the various properties for future evaluation. A ranking table that highlighted pegmatite volume, mineralogy and Li2O and Ta2O5 grade was established. Within the more prospective areas, Sigma concentrated its activities on detailed geological and mineralogical mapping of historically mined pegmatites, in particular, on the larger pegmatites.

 

1.5Geological Setting and Mineralization

 

The pegmatites in the Project area are classified as lithium–cesium–tantalum or LCT types. The Project area lies in the Eastern Brazilian Pegmatite Province (EBP) that encompasses a very large region of about 150,000 km2, stretching from the state of Bahia to Rio de Janeiro state.

 

21501-REP-PM-001
Page | 25

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

The pegmatite swarm is associated with the Neoproterozoic Araçuaí orogeny and has been divided into two main types: anatectic (directly formed from the partial melting of the country rock) or residual pegmatite (fluid rich silicate melts resulting from the fractional crystallization of a parent magma). The pegmatites in the Project area are interpreted to be residual pegmatites and are further classified as LCT types.

 

Pegmatite bodies are typically hosted in a grey biotite–quartz schist and form bodies that are generally concordant with the schist foliation but can also cross-cut foliation. The dikes are sub-horizontal to shallow-dipping sheeted tabular bodies, typically ranging in thickness from a few metres up to 40 m or more, and display a discontinuous, thin, fine-grained chilled margin. Typical pegmatite mineralogy consists of microcline, quartz, spodumene, albite and muscovite. Spodumene typically comprises about 28–30% of the dike, microcline and albite around 30–35%, and white micas about 5–7%. Locally, feldspar and spodumenes crystals can reach as much as 10–20 cm in length. Tantalite, columbite and cassiterite can occur in association with albite and quartz. The primary lithium-bearing minerals are spodumene and petalite. Spodumene can theoretically contain as much as 3.73% Li, equivalent to 8.03% Li2O, whereas petalite, can contain as much as 2.09% lithium, equivalent to 4.50% Li2O.

 

Features of the pegmatites where mineral resources have been estimated include:

 

Xuxa:

 

foliation concordant, strikes northwest–southeast, dips to the southeast at 40º to 45º, and is not zoned. The strike length is 1,700 m, averages 12–13 m in thickness and has been drill tested to 259 m in depth. Xuxa remains open to the west, east, and at depth.

 

Barreiro:

 

foliation discordant, strikes northeast–southwest, dips to the southeast at 30º to 35º, and is slightly zoned with a distinct spodumene zone as well as an albite zone. The pegmatite is about 600 m long (strike), 30–35 m wide, and 800 m along the dip direction. Barreiro remains open to the northeast and at depth.

 

Murial:

 

foliation discordant, strikes north–south, and has a variable westerly dip, ranging from 25º to 75º. The strike length is about 750 m, with a thickness of 15–20 m, and the down-dip dimension is 200 m. The pegmatite is zoned with a spodumene-rich intermediate zone and a central zone that contains both spodumene and petalite. The southern section of the pegmatite has lower lithium tenors than the norther portion of the dike. Murial remains open to the north, south, and at depth.

 

Lavra do Meio:

 

foliation concordant, strikes north–south, dips 75º–80º to the east. The strike length is 300 m with an average thickness of 12–15 m and a down-dip distance of 250 m. The pegmatite is zoned and contains both spodumene and petalite and remains open at depth.

 

Nezinho do Chicao:

 

The pegmatite body strikes nearly north-south (020º) and dips at 40-75º to the southeast. The dike is about 1,600 m long, 200 m down-dip and 20-30 m thick. It remains open to the north, south and at depth. The NDC pegmatite is a high-grade mix of spodumene and petalite with a variable ratio depending on the thickness of the zone.

 

1.6Exploration

 

Sigma began working on the Project in June 2012, focusing on a geological assessment of available field data to prioritize the 200 known pegmatites that occur on the various properties for future evaluation. A ranking table that highlighted pegmatite volume, mineralogy and Li2O and Ta2O5 grade was established.

 

21501-REP-PM-001
Page | 26

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Within the more prospective areas, Sigma concentrated its activities on detailed geological and mineralogical mapping of historically mined pegmatites, in particular, on the larger pegmatites, Xuxa and Barreiro. These dikes were channel sampled and subsequently assessed for their lithium, tantalum and cassiterite potential. This work was followed by bulk sampling, drilling and metallurgical test work. In the southern complex area, Sigma geologists have visited sites of historical workings, and undertaken reconnaissance mapping and sampling activities. The Lavra Grande, Samambaia, Ananias, Lavra do Ramom and Lavra Antiga pegmatites were mined for spodumene and heavy minerals, and in some cases gem-quality crystals were targeted. These pegmatites are considered to warrant additional work.

 

1.7Drilling

 

Drilling completed by Sigma across the Project area consists of 409 core holes totalling 71,538 m. To date, this drilling has concentrated on the Grota do Cirilo pegmatites. Drilling was completed using HQ core size (63.5 mm core diameter) in order to recover enough material for metallurgical testing. Drill spacing is variable by pegmatite, but typically was at 50 m with wider spacing at the edges of the drill pattern. Drill orientations were tailored as practicable to the strike and dip of the individual pegmatites. The drill hole intercepts range in thickness from approximately 85–95% of true width to near true width of the mineralization.

 

All core was photographed. Drill hole collars were picked up in the field using a Real Time Kinematic (RTK) global positioning system (GPS) instrument with an average accuracy of 0.01 cm. All drill holes were down-hole surveyed by Sigma personnel using the Reflex EZ-Track and Reflex Gyro instruments. Calibrations of tools were completed every year since 2017.

 

Sampling intervals were determined by the geologist, marked and tagged based on lithology and mineralization observations. The typical sampling length was 1 m but varied according to lithological contacts between the mineralized pegmatite and the host rock. In general, 1-2 m host rock samples were collected from each side that contacts the pegmatite.

 

Sigma conducted HQ drilling programs in 2014, 2017, 2018, 2020, 2021 and 2022 on selected pegmatite targets. The drill programs have used industry-standard protocols that include core logging, core photography, core recovery measurements, and collar and downhole survey measurements. There are no drilling, sampling or recovery factors that could materially impact the accuracy and reliability of the results in any of the drill campaigns. Drill results from Grota do Cirilo property support the Mineral Resource and Mineral Reserve (MRMR) estimates the Xuxa DFS and the Barreiro PFS.

 

1.8Sample Preparation, Analyses and Security

 

Sampling intervals were determined by the geologist, marked and tagged based on lithology and mineralization observations. The typical sampling length was 1 m but varied according to lithological contacts between the mineralized pegmatite and the host rock. In general, 1 m host rock samples were collected from each side that contacts the pegmatite.

 

All samples collected by SMSA during the course of the 2012–2022 exploration programs were sent to the SGS Geosol laboratory (SGS Geosol) located in the city of Belo Horizonte, Brazil. A portion of the 2017–2018 and 2020-2022 sample pulps were prepared by ALS Brazil Ltda. in Vespasiano, Brazil (ALS Vespasiano) and shipped to ALS Canada Inc. Chemex Laboratory (ALS Chemex) in North Vancouver, BC, Canada for cross check validation. A portion of the 2014 samples were resampled by the QP and sent for validation to the SGS Lakefield Laboratory (SGS Lakefield) in Lakefield Canada. All laboratories, including ALS Chemex, ALS Vespasiano, SGS Lakefield and SGS Geosol are ISO/IEC 17025 accredited. The SGS Geosol laboratory is ISO 14001 and 17025 accredited by the Standards Council. All laboratories used for the technical report are independent from SMSA and Sigma and provide services to SMSA pursuant to arm’s length service contracts.

 

21501-REP-PM-001
Page | 27

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Sample preparation conducted at SGS Geosol consisted of drying, crushing to 75% passing 3 mm using jaw crushers, and pulverizing to 95% passing 150 mesh (106 µm) using a ring and puck mill or a single component ring mill. In 2017, SGS Geosol performed 55-element analysis using sodium peroxide fusion followed by both inductively coupled plasma optical emission spectrometry (ICP-OES) and inductively coupled plasma mass spectrometry (ICP-MS) finish (SGS code ICM90A). This method uses 10 g of the pulp material and returns different detection limits for each element and includes a 10 ppm lower limit detection for Li and a 10,000 ppm upper limit detection for Li. In 2018, SGS Geosol used a 31-element analytical package using sodium peroxide fusion followed by both Inductively Coupled Plasma Atomic Emission Spectrometry (ICP-AES) and ICP-MS finish (SGS code ICP90A). The 2020-2022 samples were assayed by SGS Geosol with a 31-element analytical package using sodium peroxide fusion followed by both Inductively Coupled Plasma Optical Emission Spectrometry (ICP-OES) and ICP-MS finish (SGS code ICP90A) For Li, the lower limit of detection is 10 ppm, and the upper limit of detection is 15,000 ppm (1.5% Li).

 

Sample preparation at ALS Vespasiano comprised drying, crushing to 70% passing 2 mm using jaw crushers, and pulverizing to 85% passing 200 mesh (75 µm) using a ring and puck mill or a single component ring mill. Lithium and boron were determined by sodium peroxide fusion followed by ICP-AES analysis (ALS Chemex method ME-ICP82b).

 

The 2017 witness samples collected on the 2014 drill core were analyzed at SGS Lakefield using sodium peroxide fusion followed by both ICP-OES and ICP-MS finish (SGS code ICM90A).

 

In addition to the laboratory quality assurance quality control (QA/QC) routinely implemented by SGS Geosol and ALS Chemex using pulp duplicate analysis, SMSA developed an internal QA/QC protocol for the Xuxa drilling, which consisted of the insertion of analytical standard reference materials (standards), blanks and core duplicates on a systematic basis with the samples shipped to the analytical laboratories. In 2017 and 2021, Sigma also sent pulps from selected mineralized intersections to ALS Chemex for reanalysis. No pulp reanalysis was performed by Sigma in 2013 and 2014. A total of 729 pulp samples from the 2017, 2018, 2020 and 2021 Xuxa, Barreiro, Murial and Lavra do Meio drilling programs were sent to ALS Vespasiano for third-party verification.

 

SMSA inserted standards in sample batches during the 2014,2017–2018 and 2020-2022 sampling programs. The 2017–2018 campaign used seven certified standards from African Mineral Standards (AMIS), an international supplier of certified reference materials while the 2020-2022 campaign used four certified AMIS standards. A total of 88 standards were inserted during the 2017 campaign and 315 were inserted during the 2018 campaign, with a further 73 standards submitted in the 2021 campaign and 191 samples submitted in 2021-2022. Results were considered acceptable, and no material accuracy issues were noted.

 

During the 2017–2018 and 2020-2022 campaigns SMSA included insertion of analytical blanks in the sample series as part of their internal QA/QC protocol. The blank samples, which are made of fine silica powder provided by AMIS, are inserted an average of one for every 20 samples by the SMSA geologist and subsequently sent to SGS Geosol. The same procedure was used by SMSA for the 2014 drilling campaign. A total of 919 analytical blanks were analysed during the 2014, 2017–2018 and 2020-2022 exploration programs. Results were considered acceptable, and no material contamination issues were noted.

 

SMSA inserted coarse duplicates every 20th sample in the sample series as part of their internal QA/QC protocol. The sample duplicates correspond to a quarter HQ core from the sample left behind for reference, or a representative channel sample from the secondary channel cut parallel to the main channel. Assay results were considered acceptable between the two sample sets.

 

Bulk densities of the lithologies were measured by SGS Geosol by pycnometer measurement. Measurements were by lithology with special attention to the lithium bearing pegmatite. Separate measurements were made for the Xuxa, Barreiro, Murial, Lavra do Meio and NDC deposits.

 

21501-REP-PM-001
Page | 28

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

A total of 219 measurements were made on Xuxa core from 2017–2021. Of the 219 measurements, 26 were made on albite-altered pegmatite, 69 on schist, and 121 on lithium-bearing pegmatite. For Barreiro, a total of 471 measurements were made on core from the 2018 and 2021 drill programs. Of the 471 measurements, 94 were made on albite-altered pegmatite, 206 on schist, and 164 on lithium-bearing pegmatite. For Murial, a total of 134 measurements were made by the same method on core from the 2018 drill program. Of the 134 measurements, 32 were made on the albite-altered pegmatite, 58 on the schist and 44 on the lithium bearing pegmatite. For Lavra do Meio, a total of 51 measurement were made by the same method on core from the 2018 drill program. Of the 51 measurements, nine were made on the albite altered pegmatite, 22 on the schist and 20 on the lithium bearing pegmatite. For NDC, a total of 292 lithium-bearing samples had density measurements calculated, comprising 196 spodumene samples and 96 petalite samples.

 

In 2017, SGS validated the exploration processes and core sampling procedures used by SMSA as part of an independent verification program. The QP concluded that the drill core handling, logging and sampling protocols are at conventional industry standard and conform to generally accept best practices. The chain of custody was followed by SMSA employees, and the sample security procedure showed no flaws. The QP considers that the sample quality is good and that the samples are generally representative.

 

As additional QAQC, SMSA sent 664 samples from the 2017-2018 Grota do Cirillo drilling campaign to ALS Chemex for analysis using the protocol ME-ICP82b with sodium peroxide fusion. Preparation was done by ALS Vespasiano and the samples were subsequently shipped to Vancouver. The average Li concentration for the original was 6,411.4 ppm Li while the duplicate average was 6,475.9 ppm Li. This indicates a slight bias of the ALS Chemex duplicates which is well within the accepted margin of error.

 

Sigma sent 65 samples from the 2021 Barreiro drilling campaign to ALS Chemex for check sample analysis using the ALS Chemex protocol ME-ICP82b with sodium peroxide fusion.

 

The average lithium concentration for the original samples was 6,518.0 ppm Li and the duplicates averaged 6,559.7 ppm Li, with an average difference of 41.7 ppm or 0.6%. The correlation coefficient R2 of 0.9854 suggests a strong correlation and a high similarity between the two sets of samples.

 

A total of 198 coarse duplicates and 198 pulp duplicates from NDC were submitted for analysis from the 2021 and 2022 drill programs. For the coarse duplicates, the average of the original samples was 1.48% Li2O, while the duplicates averaged 1.46% Li2O a difference of 1.35%, while the original pulp samples averaged 1.48% Li2O, with the pulp duplicates averaging 1.46% Li2O, a difference of 0.68%.

 

Overall, the QP is confident that the system is appropriate for the collection of data suitable for a Mineral Resource estimate and can support Mineral Reserve estimates and mine planning.

 

1.9Data Verification

 

Visits to the Project site were conducted by Marc-Antoine Laporte, P.Geo., M.Sc. from September 11 to September 15, 2017, from July 11 to July 17, 2018, from September 18 to 23, 2018, from October 18 to 21, 2021 and from May 30 to June 1 2022. These visits enabled the QP to become familiar with the exploration methods used by SMSA, the field conditions, the position of the drill hole collars, the core storage and logging facilities and the different exploration targets.

 

The database for the Project was transmitted to SGS by Sigma as comma separated values (csv) files and regularly updated by Sigma geologists. The database contains data for: collar locations; downhole surveys; lithologies and lithium assays. Upon importation of the data into the SGS proprietary modelling and mineral resources estimation software (Genesis©), SGS conducted a second phase of data validation where any discrepancies were identified and removed from the database, after consultation and verification with Sigma geologists. Finally, SGS conducted random checks on approximately 5% of the assay certificates, to validate the assay values entered in the database.

 

21501-REP-PM-001
Page | 29

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Witness sampling was undertaken in 2017 on previously sampled mineralized intervals, with the remaining half core cut to quarter core, and the samples submitted to the SGS Lakefield lab for analysis. A total of nine mineralized intervals were sampled to compare the average grade for the two different laboratories. The average for the original samples is 1.61 % Li2O while the average for the control samples is 1.59 % Li2O. The average grade difference is 0.02% which makes a relative difference of 1.28% between the original and the control samples.

 

Following the data verification process and QA/QC review, the QP is of the opinion that the sample preparation, analysis and QA/QC protocol used by SMSA for the Project follow generally accepted industry standards and that the Project data is of a sufficient quality.

 

1.10Mineral Processing and Metallurgical Testing

 

Drill core samples from the Xuxa pegmatite deposit were processed at the SGS Lakefield facility in 2018 and 2022, while samples from Barreiro were tested between November 2020 and May 2021. Work conducted on the Xuxa samples included comminution, heavy liquid separation (HLS), REFLUX classifier, dense media separation (DMS) and magnetic separation. The Barreiro test work program included sample characterization, grindability testing, HLS and DMS metallurgical test work.

 

1.10.1Xuxa

 

Drill core samples were selected and combined into six variability (Var) samples for a test work program comprising of mineralogical analyses, grindability, HLS, REFLUX™ classifier, DMS, and magnetic separation testing. Flowsheets for lithium beneficiation were developed in conjunction with the test work. The goal was to produce spodumene concentrate grading a minimum 6% Li2O and maximum 1% Fe2O3 while maximizing lithium recovery.

 

Four HLS tests, at four crush sizes (15.9 mm, 12.5 mm, 9.5 mm, and 6.3 mm) were carried out on each of the six variability samples to evaluate the recovery. The 9.5 mm crush size was selected as the optimum crush size for DMS test work, as it resulted in the highest lithium recovery with minimal fines generation.

 

The DMS variability samples were each crushed to -9.5 mm and screened into four size fractions: coarse (-9.5 mm/+6.3 mm), fines (-6.3 mm/+1.7 mm), ultrafines (-1.7 mm/+0.5 mm) and hypofines (-0.5 mm). The coarse, fines and ultrafines fractions of each variability sample were processed separately for lithium beneficiation. The REFLUX™ classifier (RC) test work was carried out with a RC-100 unit for mica rejection from the fines and ultrafines fractions only. This test work was conducted at FLSmidth’s Minerals Testing and Research Center in Utah, USA.

 

The coarse, fines and ultrafines RC underflow streams of each variability sample were processed separately through DMS. The DMS concentrate from each fraction underwent dry magnetic separation at 10,000 gauss.

 

The DMS test work flowsheet for the coarse and fines fractions included two passes through the DMS; the first at a lower specific gravity (SG) cut-point (~2.65) to reject silicate gangue and the second pass at a higher SG cut-point (ca. ~2.90) to generate spodumene concentrate. The coarse DMS middlings were re-crushed to -3.3 mm and a two stage HLS test was conducted. The ultrafines DMS test work flowsheet included both a single pass and a double pass DMS circuit at a high SG cut-point (~2.90) to generate spodumene concentrate.

 

The DMS test results demonstrated the ability to produce spodumene concentrate with >6% Li2O in most of the tests. Based on the test work results, a lithium recovery of 60.4% was selected for plant design.

 

21501-REP-PM-001
Page | 30

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

1.10.2Barreiro

 

Four variability and one composite sample were tested for Barreiro, with the goals of the program to provide preliminary process information on the metallurgical performance of mineralized material from the Barreiro deposit. The test work program was developed based on the flowsheet developed for the Xuxa deposit. The aim of the test work program was to produce chemical grade spodumene concentrate (>6% Li2O) with low iron content (<1% Fe2O3), while maximizing lithium recovery.

 

Two sets of HLS tests were undertaken. The first set was conducted using the Composite to test optimal crush size (i.e., top size of 15.9 mm, 12.5 mm, 10.0 mm, and 6.3 mm). HLS tests were then performed on each variability sample at the optimum crush size. The fine fraction (i.e., -0.5 mm) was screened out from each sub-sample and the oversize fraction was submitted for HLS testing. A crush size of -10 mm was determined to be optimal and variability HLS testing was undertaken at this crush size. Interpolated stage recoveries (6% Li2O concentrate) for the four variability samples ranged from 56.0% to 77.3%.

 

In all four variability samples, HLS tests produced >6% Li2O spodumene concentrate with low iron content (<1.0% Fe2O3).

 

Pilot-scale DMS test work was operated on the composite sample. Dry magnetic separation was undertaken on the DMS feed. DMS test work results showed combined spodumene concentrate grade of 6.11% Li2O and stage recovery of 59.5% for a global recovery of 50.9%.

 

1.11Mineral Resource Estimates

 

Mineral Resources for the Grota do Cirilo pegmatite were estimated using a computerised resource block model. Three-dimensional wireframe solids of the mineralisation were defined using drill hole Li2O analytical data.

 

Data were composited to 1 m composite lengths, based on the north–south width of the block size defined for the resource block model. Compositing starts at the schist-pegmatite contact. No capping was applied on the analytical composite data. The Xuxa, Murial, Lavra do Meio and NDC models used a 5 m x 3 m x 5 m block size and the Barreiro model used a 5 m x 5 m x 5 m block. Average densities were applied to blocks, which varied by pegmatite, from 2.65 t/m3 at Lavra do Meio to 2.71 t/m3 at Barreiro.

 

Variography was undertaken for Xuxa, Barreiro, Lavra do Meio and NDC, and the projection and Z-axis rescaling were done according to the mineralization orientation.

 

The grade interpolation for the Xuxa, Barreiro, Lavra do Meio and NDC resource block models were completed using ordinary kriging (OK). The Murial model was estimated using an inverse distance weighting to the second power (ID2) methodology. The interpolation process was conducted using three successive passes with more inclusive search conditions from the first pass to the next until most blocks were interpolated, as follows:

 

Pass 1:

Xuxa: search ellipsoid distance of 75 m (long axis) by 75 m (intermediate axis) and 25 m (short axis) with an orientation of 130° azimuth and -50° dip to the southeast; minimum of seven composites, a maximum of 15 composites and a minimum of three drill holes.

Barreiro: search ellipsoid distance of 55 m (long axis) by 55 m (intermediate axis) and 25 m (short axis) with an orientation of 155° azimuth and -35° dip to the southeast; a minimum of seven composites, a maximum of 15 composites and a minimum of three drill holes.

Murial: 75 m (long axis) by 75 m (intermediate axis) and 35 m (short axis) with an orientation of 95° azimuth and -80° dip to the west; minimum of seven composites, a maximum of 15 composites and a minimum of three drill holes.

Lavra do Meio: 50 m (long axis) by 50 m (intermediate axis) and 25 m (short axis) with an orientation of 280° azimuth and -75° dip to the east; minimum of five composites, a maximum of 15 composites and a minimum of three drill holes.

NDC: search ellipsoid distance of 75 m (long axis) by 75 m (intermediate axis) and 25 m (short axis) with an orientation of 18° azimuth and -50° dip to the east; minimum of seven composites, a maximum of 15 composites and a minimum of three drill holes.

 

21501-REP-PM-001
Page | 31

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Pass 2:

Xuxa: twice the search distance of the first pass; minimum of seven composites, a maximum of 15 composites and a minimum of three drill holes.

Barreiro: twice the search distance of the first pass; a minimum of seven composites, a maximum of 15 composites and a minimum of three drill holes.

Murial: twice the search distance of the first pass; minimum of seven composites, a maximum of 15 composites and a minimum of three drill holes.

Lavra do Meio: twice the search distance of the first pass; minimum of five composites, a maximum of 15 composites and a minimum of three drill holes.

NDC: twice the search distance of the first pass; minimum of seven composites, a maximum of 15 composites and a minimum of three drill holes.

 

Pass 3:

Xuxa: 300 m (long axis) by 300 m (intermediate axis) by 100 m (short axis) with a minimum of seven composites, a maximum of 25 composites and a minimum of three drill holes.

Barreiro: 250 m (long axis) by 250 m (intermediate axis) by 100 m (short axis) with a minimum of seven composites, a maximum of 25 composites and no minimum number of drill holes.

Murial: 200 m (long axis) by 200 m (intermediate axis) by 100 m (short axis) with a minimum of seven composites, a maximum of 20 composites and no minimum number of drill holes.

Lavra do Meio: 125 m (long axis) by 125 m (intermediate axis) by 75 m (short axis) with a minimum of five composites, a maximum of 15 composites and no minimum composites required per drill hole.

NDC: 300 m (long axis) by 300 m (intermediate axis) by 100 m (short axis) with a minimum of seven composites, a maximum of 25 composites and a minimum of three drill holes.

 

The estimates and models were validated by statistically comparing block model grades to the assay and composite grades, and by comparing block values to the composite values located inside the interpolated blocks. The estimates were considered reasonable.

 

Mineral Resources are classified into Measured, Indicated and Inferred categories. The Mineral Resource classification is based on the density of analytical information, the grade variability and spatial continuity of mineralization. The Mineral Resources were classified in two successive stages: automated classification, followed by manual editing of final classification results. Classifications were based on the following:

 

Measured Mineral Resources

 

Xuxa: the search ellipsoid used was 50 m (strike) by 50 m (dip) by 25 m with a minimum of seven composites in at least three different drill holes.

Barreiro, Murial, and Lavra do Meio: the search ellipsoid was 55 m (strike) by 55 m (dip) by 35 m with a minimum of five composites in at least three different drill holes

NDC: the search ellipsoid used was 75 m (strike) by 75 m (dip) by 25 m with a minimum of seven composites in at least three different drill holes.

 

Indicated Mineral Resources.

 

In all deposits, the search ellipsoid was twice the size of the Measured category ellipsoid using the same composites selection criteria.

 

Inferred Mineral Resources

 

In all deposits, all remaining blocks.

 

Conceptual economic parameters were used to assess the reasonable prospects of eventual economic extraction. A series of economic parameters were estimated to represent the production cost and economic prospectivity of an open pit mining operation in Brazil and came either from SGS Canada or SMSA. These parameters are believed to be sufficient to include all block models in future open pit mine planning, due mostly to the relatively low mining costs in Brazil.

 

21501-REP-PM-001
Page | 32

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

The Mineral Resource estimates for Grota do Cirilo are reported in Table 1-1 to Table 1-5 using a 0.5% Li2O cut-off. The Mineral Resource estimates are constrained by the topography and are based on the conceptual economic parameters. The Xuxa, Murial and Lavra do Meio estimates have an effective date of January 10, 2019, the Barreiro estimate has an effective date of February 10, 2022 and the NDC estimate has an effective date of May 30, 2022. The QP for the estimates is Mr. Marc-Antoine Laporte, P.Geo., an SGS employee.

 

Table 1-1: NDC Deposit Mineral Resource Estimate

 

Cut-off Grade
Li2O (%)
Category Tonnes
(Mt)
Average
Grade Li2O
(%)
LCE (Kt)
0.5 Measured 2,400,000 1.55 92
0.5 Indicated 20,900,000 1.48 765
0.5 Measured + Indicated 23,300,000 1.49 857
0.5 Inferred 3,500,000 1.48 129

 

Notes to accompany Table 1-1 NDC Mineral Resource Estimate:

 

1.Mineral Resources have an effective date of May 30, 2022 and have been classified using the 2014 CIM Definition Standards. The Qualified Person for the estimate is Mr Marc-Antoine Laporte, P.Geo., an SGS employee.

2.All Resources are presented undiluted and in situ, constrained by continuous 3D wireframe models, and are considered to have reasonable prospects for eventual economic extraction.

3.Mineral Resources are reported assuming open pit mining methods, and the following assumptions: lithium concentrate (6% Li2O) price of US$1,500/t, mining costs of US$2.2/t for mineralization and waste, crushing and processing costs of US$10/t, general and administrative (G&A) costs of US$4/t, concentrate recovery of 60%, 2% royalty payment, pit slope angles of 52-55º, and an overall cut-off grade of 0.5% Li2O.

4.Tonnages and grades have been rounded in accordance with reporting guidelines. Totals may not sum due to rounding.

5.Mineral resources which are not mineral reserves do not have demonstrated economic viability. An Inferred Mineral Resource has a lower level of confidence than that applying to a Measured and Indicated Mineral Resource and must not be converted to a Mineral Reserve. It is reasonably expected that the majority of Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration.

6.The results from the pit optimization are used solely for the purpose of testing the “reasonable prospects for economic extraction” by an open pit and do not represent an attempt to estimate mineral reserves. There are no mineral reserves on the Property. The results are used as a guide to assist in the preparation of a Mineral Resource statement and to select an appropriate resource reporting cut-off grade.

7.The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues.

 

Table 1-2 – Xuxa Deposit Mineral Resource Estimate

 

Cut-off Grade
Li2O (%)
Category Tonnage
(t)
Average Grade
Li2O (%)
LCE (Kt)
0.5 Measured 10,193,000 1.59 400.8
0.5 Indicated 7,221,000 1.49 266.1
0.5 Measured + Indicated 17,414,000 1.55 666.9
0.5 Inferred 3,802,000 1.58 148.6

 

Notes to accompany Table 1.2 Xuxa Deposit Mineral Resource Estimate:

 

1.Mineral Resources have an effective date of January 10, 2019 and have been classified using the 2014 CIM Definition Standards. The Qualified Person for the estimate is Mr. Marc-Antoine Laporte, P.Geo., an SGS employee.

2.Mineral Resources are reported assuming open pit mining methods, and the following assumptions: lithium concentrate (6% Li2O) price of US$1,000/t, mining costs of US$2/t for mineralization and waste, US$1.2/t for overburden, crushing and processing costs of US$12/t, general and administrative (G&A) costs of US$4/t, concentrate recovery of 85%, 2% royalty payment, pit slope angles of 55º, and an overall cut-off grade of 0.5% Li2O.

3.Tonnages and grades have been rounded in accordance with reporting guidelines. Totals may not sum due to rounding.

4.Mineral Resources are reported inclusive of those Mineral Resources converted to Mineral Reserves. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

 

21501-REP-PM-001
Page | 33

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 1-3 – Barreiro Deposit Mineral Resource Estimate

 

Cut-off Grade
Li2O (%)
Category Tonnage
(t)
Average
Grade Li2O
(%)
LCE (Kt)
0.5 Measured 18,741,000 1.41 653.5
0.5 Indicated 6,341,000 1.30 203.9
0.5 Measured + Indicated 25,081,000 1.38 857.4
0.5 Inferred 3,825,000 1.39 131.5

 

Notes to accompany Table 1-3 Barreiro Deposit Mineral Resource table:

 

1.Mineral Resources have an effective date of February 11, 2022 and have been classified using the 2014 CIM Definition Standards. The Qualified Person for the estimate is Mr. Marc-Antoine Laporte, P.Geo., an SGS employee.

2.All Resources are presented undiluted and in situ, constrained by continuous 3D wireframe models, and are considered to have reasonable prospects for eventual economic extraction.

3.Mineral Resources are reported assuming open pit mining methods, and the following assumptions: lithium concentrate (6% Li2O) price of US$1,500/t, mining costs of US$2.2/t for mineralization and waste, crushing and processing costs of US$10/t, general and administrative (G&A) costs of US$4/t, concentrate recovery of 60.7%, 2% royalty payment, pit slope angles of 52-55º, and an overall cut-off grade of 0.5% Li2O.

4.Tonnages and grades have been rounded in accordance with reporting guidelines. Totals may not sum due to rounding.

5.Mineral resources which are not mineral reserves do not have demonstrated economic viability. An Inferred Mineral Resource has a lower level of confidence than that applying to a Measured and Indicated Mineral Resource and must not be converted to a Mineral Reserve. It is reasonably expected that the majority of Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration.

6.The results from the pit optimization are used solely for the purpose of testing the “reasonable prospects for economic extraction” by an open pit and do not represent an attempt to estimate mineral reserves. There are no mineral reserves on the Property. The results are used as a guide to assist in the preparation of a Mineral Resource statement and to select an appropriate resource reporting cut-off grade.

7.The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues.

 

Table 1-4 – Murial Deposit Mineral Resource Estimate

 

Cut-off Grade
Li2O (%)
Category Tonnage
(t)
Average
Grade Li2O
(%)
LCE (Kt)
0.5 Measured 4,175,000 1.17 120.8
0.5 Indicated 1,389,000 1.04 35.7
0.5 Measured + Indicated 5,564,000 1.14 156.5
0.5 Inferred 669,000 1.06 17.5

 

Notes to accompany Table 1.4 Murial Deposit Mineral Resource Estimate

 

1.Mineral Resources have an effective date of January 10, 2019 and have been classified using the 2014 CIM Definition Standards. The Qualified Person for the estimate is Mr. Marc-Antoine Laporte, P.Geo., an SGS employee.

2.Mineral Resources are reported assuming open pit mining methods, and the following assumptions: lithium concentrate (6% Li2O) price of US$1,000/t, mining costs of US$2/t for mineralization and waste, US$1.2/t for overburden, crushing and processing costs of US$12/t, general and administrative (G&A) costs of US$4/t, concentrate recovery of 85%, 2% royalty payment, pit slope angles of 55º, and an overall cut-off grade of 0.5% Li2O.

3.Tonnages and grades have been rounded in accordance with reporting guidelines. Totals may not sum due to rounding.

4.Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability

 

21501-REP-PM-001
Page | 34

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 1-5Lavra do Meio Deposit Mineral Resource Estimate

 

Cut-off

Grade Li2O

(%)

Category Tonnage
(t)
Average
Grade Li2O
(%)
LCE (Kt)
0.5 Measured 1,626,000 1.16 44.6
0.5 Indicated 649,000 0.93 14.9
0.5 Measured + Indicated 2,275,000 1.09 59.5
0.5 Inferred 261,000 0.87 5.6

 

Notes to accompany Table 1.5 Lavra do Meio Deposit Mineral Resource Estimate

 

1.Mineral Resources have an effective date of January 10, 2019 and have been classified using the 2014 CIM Definition Standards. The Qualified Person for the estimate is Mr. Marc-Antoine Laporte, P.Geo., an SGS employee.

2.Mineral Resources are reported assuming open pit mining methods, and the following assumptions: lithium concentrate (6% Li2O) price of US$1,000/t, mining costs of US$2/t for mineralization and waste, US$1.2/t for overburden, crushing and processing costs of US$12/t, general and administrative (G&A) costs of US$4/t, concentrate recovery of 85%, 2% royalty payment, pit slope angles of 55º, and an overall cut-off grade of 0.5% Li2O.

3.Tonnages and grades have been rounded in accordance with reporting guidelines. Totals may not sum due to rounding.

4.Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

 

Factors that can affect Grota do Cirilo Mineral Resource estimates include but are not limited to:

 

Changes to the modelling method or approach.

Changes to geotechnical assumptions, in particular, the pit slope angles.

Metallurgical recovery assumption that are based on preliminary test results.

Changes to any of the social, political, economic, permitting, and environmental assumptions considered when evaluating reasonable prospects for eventual economic extraction.

Mineral Resource estimates can also be affected by the market value of lithium and lithium compounds.

 

1.12Mineral Reserve Estimates

 

Xuxa Mineral Reserve estimates have an effective date of 26 June 2021 and have been converted from Measured and Indicated Mineral Resources. The key parameters upon which the 26 June 2021 Mineral Reserve estimates were defined are summarized in Table 1-6.

 

21501-REP-PM-001
Page | 35

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 1-6 – Parameters Used in Xuxa Pit Optimization

 

Item Unit Value
Revenue Sales Price US$/t conc.* $1500.00
Ore Density g/cm³ fixed in model
Grade % Li2O fixed in model
Mining Mine Recovering % fixed in model
Dilution fixed in model
Block Model Dimensions Block Dimensions Unit value
X x Y x Z m 5 x 3 x 5
General Angle Soil º 34
Saprolite 37.5
Fresh Rock

Sector 1 – 72º

Sector 2 – 50º

Processing Metallurgical Recovery** % 60.7
Mass Recovery*** % Calculated in block
Concentrated Grade % Li2O 6.0
Cut-off % Li2O 0.5
Costs Mining US$/t mined $2.20
Processing US$/t ore $10.70
G&A (Adjusted for OPEX) $4.00
Sale (2% cost of sale) US$/t product $14.66
  Royalties (CFEM 2%) $14.66

 

Note: * conc. = concentrate, ** based on DMS Tests, *** Including 15% fines losses - FOB Mine

 

The total Proven and Probable Mineral Reserves are as presented in Table 1-7.

 

Table 1-7 – Xuxa Mineral Reserves

 

Sigma FS Xuxa

5 x 3 x 5 (m) Block Dimensions

97% Mine Recovery, 3.75% Dilution

(Effective date: 6/26/2021)

Classification Tonnage (Mt) Li2O(%) LCE(Kt)
Proven 8.34 1.55 319.7
Probable 3.46 1.54 131.8
Total 11.80 1.55 451.5

 

Notes to accompany Mineral Reserves table:

 

1.Mineral Reserves were estimated using Geovia Whittle 4.3 software and following the economic parameters listed below:

2.Sale price for Lithium concentrate at 6% Li2O = US$1,500/t concentrate FOB Mine

3.Exchange rate US$1.00 = R$5.00.

4.Mining costs: US$2.20/t mined.

5.Processing costs: US$10.7/t ore milled.

6.G&A: US$4.00/t ROM (run of mine).

7.Mineral Reserves are the economic portion of the Measured and Indicated Mineral Resources.

8.97% Mining Recovery and 3.75% Mining Dilution

9.Final slope angle: 34° to 72° based on Geotechnical Document presented in Section 16.

10.Inferred Mineral Resources with the Final Operational Pit is 0.68 Mt grading at 1.52% Li2O. The Inferred Mineral Resources are not included in the Mineral Reserves.

11.Strip Ratio = 16.6 t/t (waste+Inferred mineral resources)/mineral reserves.

12.The Qualified Person for the estimate is Porfírio Cabaleiro Rodriguez, BSc. (MEng), FAIG, an employee of GE21.

 

Barreiro Mineral Reserve estimates have an effective date of February 24, 2022 and have been converted from Measured and Indicated Mineral Resources. The key parameters upon which the February 24, 2022 Mineral Reserve estimates were defined are summarized in Table 1-8.

 

21501-REP-PM-001
Page | 36

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 1-8: Parameters Used in Barreiro Pit Optimization

 

Item Unit Value
Revenue Sales Price US$/t conc.* $1,500
Ore Density g/cm³ Block model
Grade % Li2O Block model
Mining Mine Recovering % Block model
Dilution Block model
Block Model Dimensions Block Dimensions Unit value
X x Y x Z m 5 x 5 x 5
General Angle Overburden º

Sector 1 – 35º

Sector 2 – 37º

Fresh Rock

Sector 1 – 55º

Sector 2 – 52º

Processing Metallurgical Recovery** % 60.0
Mass Recovery*** % Calculated in block
Concentrated Grade % Li2O 6.0
Cut-off % Li2O 0.5
Costs Mining US$/t mined $2.19 (Ore)/$1.88 (Waste)
Processing US$/t ore $10.70
G&A (Adjusted for OPEX) $4.00
Sale (2% cost of sale) US$/t product $14.66
  Royalties (CFEM 2%) $14.66

 

Note: * conc. = concentrate, ** based on DMS Tests, *** Including 15% fines losses - FOB Mine

 

The total Proven and Probable Mineral Reserves are as presented in Table 1-9.

 

21501-REP-PM-001
Page | 37

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 1-9: Barreiro Mineral Reserves

 

Sigma PFS Barreiro

5 x 5 x 5 (m) Block Dimensions

97% Mine Recovery, 3.00% Dilution

(Effective date: 2/24/2022)

Classification Tonnage (Mt) Li2O(%) LCE(Kt)
Proven 16.93 1.38 576.8
Probable 4.83 1.29 153.1
Total 21.76 1.36 729.9

 

Notes to accompany Mineral Reserves table:

 

1.Mineral Reserves were estimated using Geovia Whittle 4.3 software and following the economic parameters listed below:

2.Sale price for Lithium concentrate at 6% Li2O = US$1,500/t concentrate FOB Mine.

3.Exchange rate US$1.00 = R$5.00.

4.Mining costs: US$2.19/t mined.

5.Processing costs: US$10.7/t ore milled.

6.G&A: US$4.00/t ROM (run of mine).

7.Mineral Reserves are the economic portion of the Measured and Indicated Mineral Resources.

8.97% Mine Recovery and 3% Mine Dilution

9.Final slope angle: 35° to 55° based on Geotechnical Document presented in Section 16.

10.Inferred Mineral Resources with the Final Operational Pit is 0.59 Mt grading at 1.32% Li2O. The Inferred Mineral Resources are not included in the Mineral Reserves.

11.Strip Ratio = 12.5 t/t (waste+Inferred mineral resource)/mineral reserve.

12.The Qualified Person for the estimate is Porfírio Cabaleiro Rodriguez, BSc. (MEng), FAIG, an employee of GE21.

 

1.13Mining Methods

 

Sigma has undertaken a program of resource drilling for the Xuxa and Barreiro deposits. Most of these drill holes have been geotechnically logged for structural data. The geotechnical data logged from these holes has been analyzed to provide estimates of slope stability, using industry standard empirical techniques.

 

1.13.1Xuxa

 

The mine layout and operation are based on the following criteria:

 

Two independent open pits areas: Pit 1 in the north and Pit 2 in the south

Single access from both pits to the mine infrastructure pad and the processing plant

Pre-splitting of the ore zone to reduce mine dilution

Elevated inter-ramp angles for the waste to reduce strip ratio.

 

The basis for the scheduling includes:

 

Six months of pre-stripping to liberate the ore

Pit 1 and Pit 2 mined in conjunction from Year 1 to Year 8 to reduce the drop-down rate and to facilitate the 1.5 Mtpa production rate

The planned open pit mine life is eight years

The mining fleet is based on road trucks and this fleet will be operated by a mining contractor.

 

21501-REP-PM-001
Page | 38

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

1.13.2Barreiro

 

The mine layout and operation are based on the following criteria:

 

A single open pit on the Barreiro pegmatite

Low height mineralized material benches to reduce mine dilution and maximize mine recovery

Pre-splitting of the mineralized material to reduce mine dilution

Elevated inter-ramp angles for the waste to reduce strip ratio

 

The basis for the scheduling includes:

 

Pre-stripping the pit to liberate mineralized material

Pit cut-backs in years 4 to 6 to expand and deepen pit

Mining at a rate of 1.80 Mtpa

The planned open pit mine life is 12 years

The mining fleet is based on road trucks and this fleet will be operated by a mining contractor.

 

1.14Recovery Methods

 

The Xuxa concentrator plant is designed to produce a target 6.0% Li2O spodumene concentrate from an ore grade of 1.46% Li2O (diluted) using dense media separation (DMS).

 

A second DMS concentrator plant would be constructed to process Barreiro ore. This plant would produce a minimum 6.0% Li2O spodumene concentrate from an ore grade of 1.39% Li2O (diluted).

 

1.14.1Processing Plant Description

 

The Xuxa plant throughput capacity is based on 1.5 Mtpa (dry) of ore fed to the crushing circuit, while the Barreiro plant is based on a nominal 1.85 Mt throughput capacity.

 

Both concentrator plants are designed based on a proven DMS circuit and include conventional three-stage crushing and screen circuit, up-flow classification for mica removal, two-stage coarse DMS circuit, two-stage fines DMS circuit, two-stage ultrafines circuit, as well as magnetic separation on the fines and ultrafines DMS concentrate final product streams.

 

Font-End Engineering Design (FEED) is currently underway for the Xuxa concentrator. Xuxa design data is based on feasibility-level metallurgical test work conducted at SGS Canada Inc. in Lakefield, Ontario. The mass balance, process design criteria and process flow diagrams were developed based on these test work data.

 

Design of the Barreiro concentrator is based on pre-feasibility-level test work conducted at SGS Canada Inc. in Lakefield, Ontario.

 

1.14.2Design Criteria and Utilities Requirements

 

The utilities consumption requirements for each plant are approximately 6.7 MW for the process plant and 1.5 MW for non-process infrastructure at the process plant.

 

The raw water consumption for process water is nominal a 35 m3/hr (make-up raw water requirement).

 

The process water will be recycled within the plant using a thickener, where all fines slurry streams will be directed and recovered. This water will be pumped to the process water tank and recycled to the circuits.

 

Consumables will include reagents and operational consumables for the crushing circuit and the DMS plant.

 

1.15Project Infrastructure

 

The Xuxa project infrastructure will be constructed on earthworks pads for the mineral processing plant, the mine operation support units, the open pits of the mines and the areas of waste rock and tailings disposal.

 

If developed, the Barreiro project will utilise the infrastructure developed for the Xuxa project.

 

21501-REP-PM-001
Page | 39

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

1.15.1Buildings, Roads, Fuel Storage, Power Supply and Water Supply

 

Access to the processing plant will be by municipal roads linking BR367 within the communities of Poço D’antas and Taquaril Seco. The current road will be suitable for truck traffic; however, construction of a new section of the road will be necessary to bypass the plant.

 

The plant and mine services areas will have administrative buildings such as offices, changeroom, cafeteria, concierge, clinic, fire emergency services and operation support facilities such as workshops and warehouses.

 

Fuel will be stored and dispensed from a fuel facility located at the mine services area.

 

Power will be supplied from the existing power grid line. Two main sub-stations (CEMIG and plant) will be installed to supply power to the plant, the mine services area and associated infrastructure.

 

Raw water will be supplied from the Jequitinhonha River, treated as necessary and reticulated within the plant for process, potable and firewater needs.

 

1.15.2Waste Rock and Tailings Disposal and Stockpiles

 

At Xuxa, waste rock will be stored in three waste piles in the vicinity of the Xuxa pits. Geotechnical studies determined an optimal bench height of 20 m, with a face angle of 38°. The access ramps will be 12 m wide, with a maximum gradient of 10%.

 

Table 1-10 shows the capacities of the Xuxa waste piles.

 

Table 1-10 – Xuxa Waste Pile Storage

 

Designed Pile

Volume

(Mm³)

Area

(ha)

Pile 1 14.9 34.0
Pile 2 43.3 74.3
Pile 3 35.9 55.8
TOTAL 94.1 164.1

 

The Barreiro waste will be stored in a single waste pile close to the Barreiro pit. The waste pile parameters are the same as the Xuxa parameters – 20 m bench height, 38° face angle, 12 m access ramp and a maximum gradient of 10%.

 

Table 1-11 show the capacity of the Barreiro waste pile.

 

Table 1-11: Barreiro Waste Pile Storage

 

Waste Pile Value
Volume (Mm3) 110.9
Area (ha) 122.7
Maximum height (m) 220

 

The tailings stockpile will be fed by a radial stacker from the process plant. The tailings will then be loaded into mine trucks by front end loaders and transported to a waste pile for disposal.

 

21501-REP-PM-001
Page | 40

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

1.15.3Control Systems and Communication

 

A process control system (PCS) including a main plant supervisory control and data acquisition (SCADA) system will be installed for monitoring and control purposes.

 

The telecommunications network will consist of the telecommunications network, access control system and radio frequency identification (RFID).

 

1.16Market Studies and Contracts

 

The key information contained in the market study regarding lithium demand, supply and price forecasts are summarized from Benchmark Mineral Intelligence.

 

1.16.1Demand and Consumption

 

Lithium’s demand growth profile increased dramatically in 2021, driven by structural changes in the automotive industry with manufactures increasingly transitioning towards electric vehicles (EVs). Benchmark Mineral Intelligence estimates global EV penetration reached 7.9% in 2021, up from 4.0% in 2020, as global EV sales continue to accelerate, particularly from Europe and China.

 

Benchmark Mineral Intelligence estimates that 2021 lithium supply-demand ended in a deficit position and expects that it will tighten further going forward, with 2022 forecasted to have a base case demand from battery end-use of 541 kt LCE, a 32% increase from 2021. This deficit position is expected to continue to increase, reaching a net deficit position of 156 kt LCE by 2030 and 2.1 Mt LCE by 2040.

 

Benchmark Mineral Intelligence's robust demand outlook is partially driven by continued EV adoption, with global EV penetration expected to climb to 21% of total sales by 2025 and reach 73% by 2040.

 

1.16.2Supply

 

Benchmark Mineral Intelligence expects lithium supply to increase over the 604 kt LCE of total supply estimated in 2022, given the robust commodity price outlook for lithium.

 

In the longer term, Benchmark Mineral Intelligence forecasts that the total lithium supply will reach 2.2 Mt LCE by 2030 and 3.7 Mt LCE by 2040. Benchmark Mineral Intelligence’s supply forecast includes expansions from existing mines as well as new entrants developing pre-production projects.

 

1.16.3Contracts

 

On April 5, 2019, Sigma entered into a binding head of agreement (the Agreement) for a strategic offtake and funding partnership with Mitsui & Co., Ltd. of Japan (Mitsui) for a portion of the funding required for the capital expenditures and project construction.

 

Pursuant to the Agreement, Mitsui and Sigma had agreed terms on:

 

Production pre-payment to Sigma of US$30,000,000 for battery-grade lithium concentrate supply of up to 55,000 t annually over six years, extendable for five years plus an off-take agreement supplementary 25,000 t of product annually

Advancement of deposit for long-lead items for the project

Strategic collaboration to leverage Mitsui’s considerable global logistics and battery materials marketing expertise as well as an agreement to continue discussions regarding additional funding for further exploration and development of Sigma’s mineral properties

Mitsui’s right to participate in Sigma’s future capital for production expansion with other deposits conditional to concluding a feasibility study and Mineral Reserves estimates

Sales prices are set quarterly based on the published price of nominal arms-length chemical-spodumene concentrate above 6% Li2O (SC6).

 

21501-REP-PM-001
Page | 41

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

An initial deposit payment of US$3.0 million was received by Sigma on April 4, 2019, but any further rights of the parties to the Agreement were subject to certain conditions not met, including the negotiation and execution of related definitive offtake agreements with Mitsui. It remains to be determined whether a mutually acceptable role for Mitsui can be agreed upon.

 

On October 6, 2021, Sigma announced the signing of a binding term sheet for an offtake agreement on a “take or pay” basis (LGES Offtake) for the sale of up to 100,000 tonnes per year of battery grade lithium concentrate to LG Energy Solution, Ltd (LGES), one of the world’s largest manufacturers of advanced lithium-ion batteries for EVs.

 

The six-year LGES Offtake starts with 60,000 tonnes per year in 2023 and is expected to increase to 100,000 tonnes per year from 2024 to 2027 (Guaranteed Take-or-Pay Quantity), subject to Sigma and LGES executing mutually acceptable definitive documentation to implement the LGES Offtake. Sigma and LGES are also to negotiate each year, starting in 2022, an additional optional supply of battery grade lithium concentrate (Optional Offtake Quantity), not otherwise committed by Sigma in other offtake arrangements.

 

Pursuant to the LGES Offtake, Sigma will receive a price for the delivered battery grade lithium concentrate linked to the market prices for high purity lithium hydroxide.

 

Sigma has no contracts in place in support of operations. but is in negotiations with respect to a number of contracts pertaining to mining contracting, road transport, port handling and power. Any future contracts are likely to be negotiated and renewed on an annual or biannual basis. Contract terms are expected to be typical of similar contracts in Minas Gerais State.

 

1.16.4Price Forecast

 

Tight market supply combined with rapidly improving demand for lithium chemicals is expected to put continued strong upward pressure on prices. Benchmark Mineral Intelligence’s base case forecast expects prices to continue to rise through 2023 as demand outstrips supply with real lithium hydroxide and spodumene 6% prices hitting US$33,900/t and US$2,900/t in 2023, respectively. Benchmark Mineral Intelligence then expects prices to stabilize at higher levels in 2024 and begin to decline to more stable levels in a balanced supply-demand market starting in 2025. Benchmark Mineral Intelligence estimates longer term real lithium hydroxide and spodumene 6% prices of US$16,300/t and US$850/t in 2030, respectively.

 

1.17Environmental Studies, Permitting and Social or Community Impact

 

Conselho Estadual de Politica Ambiental (COPAM) granted an Operation License in support of certain SMSA mining concessions on the Grota do Cirilo property on August 25, 1994. The licence was renewed on August 14, 2008 but has subsequently been allowed to lapse as it was not suitable for the new level of mining contemplated by Sigma. Sigma applied and was issued the first phase of the Preliminary License (Licença Previa or LP) and an Installation License (Licença de Instalação or LI) to commence construction at the Xuxa deposit. Mining licenses are for life of mine and environmental licences are timely renewed when due.

 

Sigma holds approved economic mining plans (Plano de Aproveitamento Econômico or PAE) over the Xuxa, Barreiro, Lavra do Meio, Murial, Maxixe and Nezinho do Chicâo deposits within the Grota do Cirilo property. The PAE for Xuxa was updated and approved in August 2018.

 

Reclamation plans (referred to as degraded area plans or PRADs) have been developed and implemented for certain past-producing areas within the Grota do Cirilo property. The successful recovery of these areas is managed by SMSA personnel and external consultants in conjunction with the governing regulatory agencies.

 

21501-REP-PM-001
Page | 42

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Sigma has held regular meetings and consultation sessions with local stakeholders regularly over the last five years. The further development of SMSA mining activities in the Jequitinhonha Valley is viewed by both communities as an important regional economic driver.

 

1.17.1Applicable Legal Requirements for Project Environmental Permitting

 

CONAMA Resolution N° 237 (1997) defines environmental licensing as an administrative procedure by which the competent environmental agency permits the locating, installation, expansion and operation of enterprises and activities that use environmental resources in a manner considered to be effectively or potentially polluting.

 

The licensing process in Minas Gerais has been developed in accordance with COPAM Regulatory Deliberation N° 217, dated December 6, 2017, and establishes classification criteria based on scale and polluting potential, as well as the locational criteria used to define the modalities of environmental licensing of ventures and activities that use environmental resources in the state of Minas Gerais.

 

In compliance with CONAMA Resolution 09/90, the environmental licensing of mining projects is always subject to an Environmental Impact Assessment (EIS), followed by an Environmental Impact Report (EIR), which supports the technical and environmental feasibility stage of the project and the granting of a LP and/or a concurrent LP + LI.

 

1.17.2Current Project Environmental Permitting Status

 

A Concurrent Environmental Licensing Type CEL 2 (LP + LI) will be required in support of operations.

 

The water license for the uptake of 150 m³/h of water from the Jequitinhonha River was approved by the Agencia Nacional das Águas (ANA) in February 2019.

 

The CEL 2 (LP + LI) for the initial project phase, consisting of the north pit (Pit #1), waste piles 1 and 2 and the plant area was submitted on December 20, 2018 and was followed by the complete presentation of the EIS, the EIR and the Environmental Control Plan (ECP) as well the other documents listed in Basic Guidance Form (BGF). The EIS (Estudo e Relatorio de Impacto Ambiental – EIA-RIMA dated 30 October 2018) and Plano de Controle Ambiental – PCA dated December 2018 were prepared and issued for submittal to the authorities by NEO Soluções Ambientais and ATTO GEO Geologia e Engenharia. Approval was obtained on June 3, 2019.

 

A second EIS covering Pit #2 and waste piles #3 and #4 was formally submitted for approval in March 2020 in line with the prescribed permitting timing requirements for the process plant coming online with Pit #1.

 

1.17.3Authorization

 

SMSA is the owner of the mining rights registered under DNPM Nº 824.692/1971, and the holder of Mining Concession Ordinance Nº 1.366, published on October 19, 1984. In 2018 a new Economic Development Plan (EDP) was registered with the National Mining Agency (ANM), which was approved on November 16, 2018.

 

The approval of the EDP and environmental study involves the technical and legal analysis and formal approval of the proposed project. With the granted LP + LI, the company must now install the project within 5 years, comply with the environmental conditions established in the LP + LI certificate and finally, apply for the Operation License after installation in order to begin operational activities.

 

The formalization of the environmental licensing process also included requesting and granting of the EIA. This allows Sigma environmental intervention in an approximately 64 ha area.

 

21501-REP-PM-001
Page | 43

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

1.17.4Land Access

 

Sigma has a lease agreement with Miazga Participações S.A., owner of the Poço Danta-Paiuí, Poço Danta and Poço Dantas Farms, to carry out mining activities on its properties. These farms include Legal Reserves (LR) which are preserved and registered in the National Rural Environmental Registration System (NRERS), in accordance with Law Nº 12.651, dated May 25, 2012.

 

Sigma is also leasing the following individual farms: Lucinéia Fátima de Souza, Demostenes Vieira Filho, Jose Antonio Teixeira dos Santos, Ildete Faria, Vanusia Santos, Nixon Borges, Sandro Araújo, Claudenice Silva, Ustane Ribeiro, Nizoeiro Souza, Lourivaldo Araujo and Joaquim Ferreira Santos.

 

1.17.5Social License Considerations

 

Sigma understands and accepts the importance of proactive community relations as an overriding principle in its day-to-day operations as well as future development planning. The company therefore structures its community relations activities to consider the concerns of the local people and endeavors to communicate and demonstrate its commitment in terms that can be best appreciated and understood to maintain the social license to operate.

 

The Jequitinhonha valley is the poorest region in Minas Gerais which is plighted by poverty and is in the lowest quartile the Human Development Index (HDI). Sigma is the largest investment and operation in the area by a factor of ten and the project will be transformational to the local communities. The largest direct economic benefit is that Sigma is subject to a 2% royalty on revenue which is divided between the Federal Government, State Government and Local Government. Secondly a portion of the taxes on local procurement of goods and services is shared with the Local Government. These incomes from the royalty and tax are a most important source of funding for local Government and Sigma is the largest direct contributor in the region. Sigma will be by far the largest employer in the region with an estimated 500 direct jobs being created with 3 to 4 times this number being indirect.

 

Farming in the area is small-scale subsistence type as the area is semi-arid. There is minimal impact on the neighbouring farms of Grota do Cirilo properties. Sigma and contractor workforce will live in the cities of Araçuaí and Itinga and strict environmental management plans are in place to minimize the environmental footprint of the project. An example is 90% of the process water is re-circulated and there is zero run-off water from the site except during the wet season, when excess water from the pond will be discharged in an overflow channel. The process uses dry stacking technology, and no slimes dam will be built. Regular environmental monitoring will be conducted, and results will be shared with the local communities.

 

Sigma has targeted and continues with consultations/engagements with numerous stakeholders in support of project development of the Project and has hosted visits from representatives of government departments and local academic institutions.

 

1.17.6Rehabilitation, Closure Planning and Post-Closure Monitoring

 

The closure plan for the Grota do Cirilo property encompasses the following: dismantling of building and infrastructure, removal of heavy mobile and surface equipment, restoration by reconstituting vegetal cover of the soil and the establishment of the native vegetation, grading and capping with vegetation suppression layer and revegetation of the waste rock and overburden stockpiles, removal of suppressed vegetation along with slope cover and surface drainage for water management, fencing of site, environmental liability assessment studies where there may have been spillages and soil and water contamination and safe disposal, revegetation of the open pit berm areas and fencing around the open pits.

 

In the post-closure phase, a socioenvironmental and geotechnical monitoring program will be carried out, to support ecosystem restoration or preparation for the proposed future use.

 

21501-REP-PM-001
Page | 44

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

The monitoring program will collect soil and diversity of species on an annual basis, continuing for a five-year period after mine closure.

 

1.17.7Barreiro Environmental Work to Date

 

The Environmental Impact Study - EIA and its respective Environmental Impact Report - RIMA will be submitted to the regulatory agency, Bureau of Priority Projects - SUPPRI, as a supporting document to obtain a Preliminary License - LP and an Installation License - LI for Grota do Cirilo Project - Barreiro Pegmatite.

 

Considering the parameters defined by the current laws and regulations, CONAMA Resolution 09/90, the environmental licensing of mining projects is conditioned to EIA/RIMA submission, and these studies are the main technical resources to assess project feasibility.

 

The environmental licensing process started in October 2020 and will be formalized with the submission of the technical studies requested through the Environmental Licensing System - SLA, request No.: 2020.10.01.003.0003780 for the production of: 1,500,000 t/year for open pit mining and 251.89 ha for waste heaps.

 

1.18Capital and Operating Costs

 

1.18.1Capital Cost Estimate

 

As a basis for the CAPEX build-up, engineering and design were advanced to a FEED level for the Xuxa plant and a pre-feasibility level for the Barreiro plant with approval of key deliverables obtained from Sigma. These included the design basis, process design criteria, block flow diagram, process flow diagram, a high-level mass balance basis of design along with a similar project execution plan, schedule and site conditions as Xuxa Phase 1 FEED.

 

The total CAPEX for Xuxa including the Estimated Vat Tax Incentive is US$131.6 M. The total CAPEX already disbursed during construction is US$20,700,000 with US$110,900,545 of CAPEX remining.

 

The total CAPEX for Barreiro including the Estimated Vat Tax Incentive is US$75.7 M.

 

The CAPEX estimate has an accuracy of ±25% and is summarized in Table 1-12 (Xuxa) and Table 1-13 (Barreiro).

 

Table 1-12 – Capital Cost Estimate Summary Xuxa

 

AREA TOTALS
   

 

 

DIRECTS + INDIRECTS

(USD)

CONTINGENCY

(USD)

TOTAL

(USD)

001 Mine  7,856,938    604,984    8,461,922  
002 Plant  64,841,255    4,992,777    69,834,032  
003 Environmental  15,387,006    1,184,799    16,571,805  
004 EPCM & Engineering Services  17,867,543    1,375,801    19,243,344  
005 Substation and Utility Power Supply  6,888,863    530,442    7,419,305  
Total Construction Capital Cost  112,841,604    8,688,804    121,530,408  
006 Owner’s Project Costs  8,901,677    890,168    9,791,844  
007 Working Capital and Spares  6,137,293    –    6,137,293  
Total Construction Capital Cost (ex VAT Tax Incentive)  127,880,574    9,578,971    137,459,545  
009 Estimated VAT Tax Incentive (5,859,000)  –   (5,859,000)
Total Construction Capital Cost  122,021,574    9,578,971    131,600,545  
       
008 Sustaining and Deferred Capital 3,200,000 246,400  3,446,400  

 

21501-REP-PM-001
Page | 45

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 1-13: Capital Cost Estimate Summary Barreiro

 

AREA

TOTALS

(USD)

 

DIRECTS + INDIRECTS

(USD)

CONTINGENCY

(USD)

TOTAL

(USD)

001 Mine  2,096,208    161,408    2,257,616  
002 Plant  50,056,062    3,854,317    53,910,379  
003 Environmental  6,747,201    519,534    7,266,735  
004 EPCM & Engineering Services  10,726,444    825,936    11,552,380  
005 Substation and Utility Power Supply  –    –    –  
006 Owner’s Project Costs  3,000,000    231,000    3,231,000  
007 Working Capital and Spares  937,293    72,172    1,009,465  
Total Construction Capital Cost (VAT Tax Incentive)  73,563,208    5,664,367    79,227,575  
008 Estimated VAT Tax Incentive (3,500,000)  –   (3,500,000)
Total Construction Capital Cost (VAT Tax Incentive)  70,063,208    5,664,367    75,727,575  
       
008 Sustaining and Deferred Capital  7,070,000    544,390    7,614,390  

 

Note: The Barreiro substation costs are included in the Xuxa CAPEX estimate

 

1.18.2Operating Cost Estimate

 

The processing plant operating cost estimate includes the operation of a three-stage crushing and screening circuit and DMS circuits (two stages for coarse, fine and ultra fines material classes).

 

The processing OPEX includes operating and maintenance labour, power, fuel and indirect charges associated with the processing plant. Based on these cost assumptions, inclusions and exclusions, it is estimated that the OPEX for the Xuxa concentrator will be US$10.2/t of ore feed (or US$55.73/t of spodumene concentrate produced). The estimated OPEX for the Barreiro concentrator is US$8.4/t of ore feed (or US$66.3/t of spodumene concentrate produced).

 

Is it worth noting that General and Administration (G&A) costs to manage the site (including the two concentrators) has been accounted for into the Xuxa concentrator OPEX exercise, which explains the majority of the cost difference between to two processing plants.

 

Operating cost estimates are summarized in Table 1-14 (Xuxa) and Table 1-15 (Barreiro)

 

Table 1-14: Xuxa Operating Cost Estimate Summary

 

DESCRIPTION OPEX (US$)
Mining (US$/t material mined) $2.06
Process (US$/t ore feed) $10.2
G&A (US$/t ore feed) $3.3
Shipping (US$/t SC) $119

 

21501-REP-PM-001
Page | 46

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 1-15: Barreiro Operating Cost Estimate Summary

 

DESCRIPTION OPEX (US$)
Mining (US$/t material mined) $2.68
Process (US$/t ore feed) $8.4
G&A (US$/t ore feed) $4.3
Shipping (US$/t SC) $110

 

1.19Economic Analysis

 

1.19.1Economic Assumptions

 

Three levels of economic analyses were undertaken for the Project, contemplating the mining of the Mineral Reserves of:

 

the Xuxa deposit (Phase 1);

the Barreiro deposit (Phase 2); and

both Phase 1 and Phase 2 (Phase 1+2).

 

Additionally, the economic analyses contemplate the production of spodumene concentrate (SC) at grades of 6.0%, 5.5% and 5.2% Li2O, in order to consider the current lithium market conditions.

 

The base case scenario after-tax net present value (NPV) results are detailed in Table 1-16 below. The discount rate assumed for the after-tax NPVs is 8%.

 

A sensitivity analysis reveals that the Project’s viability will not be significantly vulnerable to variations in capital expenditures, within the margins of error associated with the DFS and PFS estimates for Phase 1 and Phase 2, respectively. In contrast, the Project’s economic returns remain most sensitive to changes in spodumene prices, feedstock grades and recovery rates.

 

Table 1-16 – Base Case After-Tax NPVs

 

Modelled Case Unit @ 6.0% SC @ 5.5% SC @ 5.2% SC
Phase 1 US$ M $2,187 $2,643 $2,820
Phase 2 US$ M $1,853 $2,438 $2,611
Phase 1+2 US$ M $4,043 $5,083 $5,435

 

Phase 1, Phase 2 and Phase 1+2 were evaluated on a pre- and after-tax basis. It must be noted that there are many potential complex factors that affect the taxation of a mining project. The taxes, depletion, and depreciation calculations in the economic analyses are simplified and only intended to give a general indication of the potential tax implications at the project level.

 

Sudene is a government agency tasked with stimulating economic development in specific geographies of Brazil. The project is to be installed in a Sudene-covered geographic area, where a tax incentive granted to the project indicates a 75% reduction of income tax for 10 years, after achieving at least 20% of its production capacity. The considered Brazilian income tax rate is assumed to be 15.25%, which represents the Sudene tax benefit applied to the Brazilian maximum corporate tax of 34% on taxable income (25% income tax plus 9% social contribution). For Phase 2 and Phase 1+2, the Sudene tax incentive is expected to be renewed after the 10th anniversary of achieving at least 20% of their production capacities.

 

21501-REP-PM-001
Page | 47

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

The Project is expected to be exempt from all importation taxes for products which there is no similar item produced in Brazil (Ex-Tarifário). Assembled equipment where some but not all individual components are produced in Brazil can be considered exempt from import taxes under these terms.

 

The Project royalties will include:

 

A 2.0% CFEM royalty on gross spodumene revenue, paid to the Brazilian Government. The CFEM royalty amount is split between the Federal Government of Brazil (12%), State Government of Minas Gerais (23%), and Municipal Government of Araçuaí (65%).

A 1.0% NSR royalty with permissible deductions from gross spodumene revenue including the CFEM royalty, any commercial discounts, transportation costs and taxes paid.

A 1.0% NSR royalty with permissible deductions including all of the costs associated with production; however, this royalty has a buyback provision for US$3.8 million which is assumed to be exercised upon achieving commercial production in the Phase 1, Phase 2 and Phase 1+2 analyses.

 

1.19.2Phase 1 DFS Economic Analysis

 

The Phase 1 economic analysis is based on an eight-year operation sourcing feedstock ore from the Xuxa deposit’s Mineral Reserve of 11.8 Mt grading at 1.55% Li2O. Phase 1 is expected to generate run-rate production of up to 286 ktpa of lithium concentrate, delivering US$485 million of annual free cash flow, at a 5.2% SC grade.

 

The base case scenario results are detailed in Table 1-17 below.

 

Table 1-17: Phase 1 Base Case Scenario Results

 

Item Unit @ 6.0% SC @ 5.5% SC @ 5.2% SC
After-Tax NPV @ 8% US$ M $2,187 $2,643 $2,820
After-Tax IRR % 482% 571% 606%
After-Tax Payback Period years 0.3 0.2 0.2

 

The key technical assumptions used in the base case are highlighted below in Table 1-18.

 

Table 1-18: Key Phase 1 Technical Assumptions

 

Item Unit @ 6.0% SC @ 5.5% SC @ 5.2% SC
Total Ore Processed (ROM) Mt 11.8 11.8 11.8
Annual ROM Ore Processed Mt 1.5 1.5 1.5
Run-Rate SC Production ktpa 230 270 286
Run-Rate LCE Production (Note 1) ktpa 34 37 37
Strip Ratio ratio 16.4: 1 16.4: 1 16.4: 1
Average Li2O Grade % 1.55% 1.55% 1.55%
Spodumene Recovery Rate % 60.4% 65.0% 65.0%
Spodumene Concentrate Grade % Li2O 6.0% 5.5% 5.2%
Operating Life years 8 8 8
Total Cash Cost (FOB) US$/t SC $386 $339 $324
Transportation Costs (CIF China) US$/t SC $119 $119 $119
Total Cash Cost (CIF China) US$/t SC $505 $458 $443
AISC (CIF China) US$/t SC $506 $459 $444
Mining Costs US$/t Material Mined $2.06 $2.06 $2.06
Processing Costs US$/t ROM $10.20 $10.20 $10.20
G&A Costs US$/t ROM $3.26 $3.26 $3.26

 

Note 1: tonnage based on direct conversion to LCE excluding conversion rate

 

21501-REP-PM-001
Page | 48

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

The total gross revenue derived from the sale of spodumene concentrate for Phase 1 is estimated up to US$5.7 billion, an average revenue of US$2,499/t 5.2% SC with total operating costs (including royalty payments and commercial discounts) of US$1.0 billion at an average cost of US$443/t 5.2% SC. The resulting after-tax earnings margin (gross revenue less realization, operating costs and taxes) was estimated at US$3.9 billion.

 

A sensitivity analysis for Phase 1 was carried out with the base case as the midpoint. An interval of ±20% versus base case values was considered with increments of 10%.

 

Phase 1 after-tax NPV is not significantly vulnerable to changes in BRL to US$ exchange rate, CAPEX, OPEX, or discount rate considered. In contrast, Phase 1 after-tax NPV is more sensitive to variation in spodumene price, lithium grade, and spodumene recovery rates.

 

Phase 1 after-tax IRR is not significantly vulnerable to changes in Opex. In contrast, Phase 1 after-tax IRR is more sensitive to variation in spodumene price, lithium grade, spodumene recovery rates, BRL to US$ exchange rate and Capex. Note that the Phase 1 after-tax IRR is independent of the discount rate considered.

 

1.19.3Phase 2 PFS Economic Analysis

 

The Phase 2 economic analysis is based on a twelve-year operation sourcing feedstock ore from the Barreiro deposit’s Mineral Reserve of 21.8 Mt grading at 1.37% Li2O. Phase 2 is expected to generate run-rate production of up to 276 ktpa of lithium concentrate, delivering US$366 million of annual free cash flow, at a 5.2% SC grade.

 

The base case scenario results are detailed in Table 1-19 below.

 

Table 1-19: Phase 2 Base Case Scenario Results

 

Item Unit @ 6.0% SC @ 5.5% SC @ 5.2% SC
After-Tax NPV @ 8% US$ M $1,853 $2,438 $2,611
After-Tax IRR % 601% 764% 813%
After-Tax Payback Period years 0.2 0.2 0.1

 

21501-REP-PM-001
Page | 49

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

The key technical assumptions used in the base case are highlighted below in Table 1-20.

 

Table 1-20: Key Phase 2 Technical Assumptions

 

Item Unit @ 6.0% SC @ 5.5% SC @ 5.2% SC
Total Ore Processed (ROM) Mt 21.8 21.8 21.8
Annual ROM Ore Processed Mt 1.8 1.8 1.8
Run-Rate SC Production ktpa 210 261 276
Run-Rate LCE Production (Note 1) ktpa 31 36 36
Strip Ratio ratio 12.5: 1 12.5: 1 12.5: 1
Average Li2O Grade % 1.37% 1.37% 1.37%
Spodumene Recovery Rate % 50.9% 57.9% 57.9%
Spodumene Concentrate Grade % Li2O 6.0% 5.5% 5.2%
Operating Life years 12 12 12
Total Cash Cost (FOB) US$/t SC $408 $340 $325
Transportation Costs (CIF China) US$/t SC $110 $110 $110
Total Cash Cost (CIF China) US$/t SC $519 $451 $435
AISC (CIF China) US$/t SC $521 $453 $437
Mining Costs US$/t Material Mined $2.68 $2.68 $2.68
Processing Costs US$/t ROM $8.40 $8.40 $8.40
G&A Costs US$/t ROM $4.30 $4.30 $4.30

 

Note 1: tonnage based on direct conversion to LCE excluding conversion rate

 

The total gross revenue derived from the sale of spodumene concentrate for Phase 2 is estimated up to US$6.9 billion, an average revenue of US$2,074/t 5.2% SC with total operating costs (including royalty payments and commercial discounts) of US$1.4 billion at an average cost of US$435/t 5.2% SC. The resulting after-tax earnings margin (gross revenue less realization, operating costs and taxes) was estimated at US$4.4 billion.

 

A sensitivity analysis for Phase 2 was carried out with the base case as described above as the midpoint. An interval of ±20% versus base case values was considered with increments of 10%.

 

Phase 2 after-tax NPV is not significantly vulnerable to changes in BRL to US$ exchange rate, Capex, Opex, or discount rate considered. In contrast, Phase 2 after-tax NPV is more sensitive to variation in spodumene price, lithium grade, and spodumene recovery rates.

 

Phase 1 after-tax IRR is not significantly vulnerable to changes in Opex. In contrast, Phase 1 after-tax IRR is more sensitive to variation in spodumene price, lithium grade, spodumene recovery rates, BRL to US$ exchange rate and Capex. Note that the Phase 1 after-tax IRR is independent of the discount rate considered.

 

1.19.4 Phase 1 + Phase 2 PFS Economic Analysis

 

The Phase 1+2 economic analysis is based on a thirteen-year operation sourcing feedstock ore from the Xuxa and Barreiro’s combined Mineral Reserves of 33.6 Mt. Phase 1+2 is expected to generate run-rate production of up to 562 ktpa of lithium concentrate, delivering US$637 million of annual free cash flow, at a 5.2% SC grade.

 

The base case scenario results are detailed in Table 1-21 below.

 

Table 1-21: Phase 1+2 Base Case Scenario Results

 

Item Unit @ 6.0% SC @ 5.5% SC @ 5.2% SC
After-Tax NPV @ 8% US$ M $4,043 $5,083 $5,435
After-Tax IRR % 495% 589% 624%
After-Tax Payback Period years 0.3 0.3 0.2

 

21501-REP-PM-001
Page | 50

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

The key technical assumptions used in the base case are highlighted below in Table 1-22.

 

Table 1-22: Key Phase 1+2 Technical Assumptions

 

Item Unit @ 6.0% SC @ 5.5% SC @ 5.2% SC
Total Ore Processed (ROM) Mt 33.6 33.6 33.6
Annual ROM Ore Processed Mt 2.6 2.6 2.6
Run-Rate SC Production ktpa 440 531 562
Run-Rate LCE Production (Note 1) ktpa 65 72 72
Strip Ratio ratio 13.8: 1 13.8: 1 13.8: 1
Average Li2O Grade % 1.43% 1.43% 1.43%
Spodumene Recovery Rate % 54.4% 60.5% 60.5%
Spodumene Concentrate Grade % Li2O 6.0% 5.5% 5.2%
Operating Life years 13 13 13
Total Cash Cost (FOB) US$/t SC $399 $340 $325
Transportation Costs (CIF China) US$/t SC $114 $114 $114
Total Cash Cost (CIF China) US$/t SC $513 $454 $438
AISC (CIF China) US$/t SC $515 $455 $440
Mining Costs US$/t Material Mined $2.39 $2.39 $2.39
Processing Costs US$/t ROM $9.04 $9.04 $9.04
G&A Costs US$/t ROM $3.93 $3.93 $3.93

 

Note 1: tonnage based on direct conversion to LCE excluding conversion rate

 

The total gross revenue derived from the sale of spodumene concentrate from Phase 1+2 is estimated up to US$12.6 billion, an average revenue of US$2,247/t 5.2% SC with total operating costs (including royalty payments and commercial discounts) of US$2.5 billion at an average cost of US$438/t 5.2% SC. The resulting after-tax earnings margin (gross revenue less realization, operating costs and taxes) was estimated at US$8.3 billion.

 

A sensitivity analysis for Phase 1+2 was carried out with the base case as described above as the midpoint. An interval of ±20% versus base case values was considered with increments of 10%.

 

Phase 1+2 after-tax NPV is not significantly vulnerable to changes in BRL to US$ exchange rate, Capex, Opex, or discount rate considered. In contrast, Phase 1+2 after-tax NPV is more sensitive to variation in spodumene price, lithium grade, and spodumene recovery rates.

 

Phase 1+2 after-tax IRR is not significantly vulnerable to changes in Opex. In contrast, Phase 1+2 after-tax IRR is more sensitive to variation in spodumene price, lithium grade, spodumene recovery rates, BRL to US$ exchange rate and Capex. Note that the Phase 1+2 after-tax IRR is independent of the discount rate considered.

 

1.20Interpretation and Conclusions

 

Mineral Resources are reported for five pegmatite bodies, Xuxa, Barreiro, Murial, Lavra do Meio and Nezinho do Chicao. Mineral Reserves are reported for the Xuxa and Barreiro deposits.

 

This report contains the Phase 3 Mineral Resource Estimate (MRE) for the Nezinho do Chicao (NDC) pegmatite.

 

21501-REP-PM-001
Page | 51

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

1.20.1Risk Assessment

 

Risk assessment sessions were conducted individually and collectively by all parties.

 

Most aspects of the project are well defined. The risks are grouped by licensing, cost (CAPEX and OPEX), schedule, operations, markets and social/environmental categories. One of the most significant risks identified for the Project is related to lithium markets.

 

The following risks are highlighted for the project:

 

Lithium market sale price and demand (commercial trends)

Delay in receiving the Environmental Operation License

Delay in obtaining the power permit and CEMIG substation energization: impact on plant start-up date

Delay in obtaining the license for Barreiro Pit

Fluctuations in the exchange rate and inflation

Labour strikes at the Port and at site (construction and operation)

Tax exemptions and import not confirmed

Increased demands from the local community once in operation

More fines generated from mining and crushing: potential negative impact on recovery

The production rate and size of the pit may impose challenges for operations

Waste generation: the continuous geotechnical monitoring system to be implemented during mining operation can indicate local changes to geotechnical parameters, and potential increase of waste

 

1.20.2Opportunities

 

The following opportunities are identified for the Grota do Cirilo Project:

 

Recovery of Li2O from hypofines with a flotation circuit

Recovery of Li2O from petalite

Sale of plant rejects to the ceramics industry

Potential upgrading of some or all of the Inferred Mineral Resources to higher-confidence categories and eventually conversion to Mineral Reserves

Potential for future underground mining at both Phase 1 and Phase 2 projects.

Exchange rate may work in the Project’s favour.

 

1.21Recommendations

 

The following summarizes the recommendations from the NDC MRE.

 

1.21.1Geology and Resources

 

The QPs recommend that additional exploration drilling be conducted across the NDC deposit to update existing resources and potentially increase resources. The overall cost for the drill program is estimated to be $800 000.

 

1.21.2NDC Recommendations

 

The recommendations for NDC are to complete a Preliminary Economic Assessment (PEA) of the deposit, which will include:

 

a.Metallurgical test work

b.Geotechnical analysis

c.Hydrogeology study

d.Mine plan

e.Plant design

f.Capex and Opex

g.Financial model

 

21501-REP-PM-001
Page | 52

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

2INTRODUCTION

 

Sigma Lithium Corporation (Sigma) requested Primero Group Americas Inc. (Primero), a division of Primero Group Ltd, together with SGS Geological Services (SGS), GE21 Consultoria Mineral (GE21) and Promon Engenharia Ltda (Promon) to prepare a NI 43-101 Technical Report (the Report) for the Sigma’s Grota do Cirilo Project located in Minas Gerais State, Brazil. (Figure 2 1). This includes a Definitive Feasibility Study (DFS) for the phase 1 Xuxa deposit and a Pre-feasibility Study (PFS) for the phase 2 Barreiro deposit.

 

 

 

Figure 2-1 – Project Location

 

2.1Terms of Reference

 

Mineral Resources are reported for four pegmatite bodies, Xuxa, Barreiro, Murial and Lavra do Meio. Mineral Reserves are reported for the Xuxa and Barreiro deposits. A feasibility study has been conducted on the Xuxa deposit and a pre-feasibility level study has been conducted on the Barreiro deposit (project phase 2).

 

Mineral Resources and Mineral Reserves are reported using the 2014 Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Definition Standards (2014 CIM Definition Standards).

 

This Report is based, in part, on internal reports and information as listed in Section 27 of this Report. Where sections from reports authored by other consultants have been directly quoted in this Report, they are indicated as such in the Report sections.

 

2.2Effective Dates

 

The effective date of the Xuxa Mineral Resource estimate is January 10, 2019.

 

21501-REP-PM-001
Page | 53

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

The effective date of the Xuxa Mineral Reserve estimate is June 21, 2021

 

The effective date of the Barreiro Mineral Resource estimate is February 24, 2022.

 

The effective date of the Barreiro Mineral Reserve estimate is February 24, 2022.

 

The effective date of the financial analysis supporting the Mineral Reserves is February 24, 2022.

 

The overall effective date of the Report is the date of the financial analysis supporting the Mineral Reserves and is February 24, 2022.

 

2.3Qualified Persons

 

This Technical Report was prepared for Sigma by or under the supervision of the following Qualified Persons (QPs):

 

Mr. Homero Delboni Jr, MAusIMM, Senior Consultant, Promon Engenharia

Mr. Marc-Antoine Laporte, P.Geo., Senior Geologist, SGS

Mr. Jarrett Quinn, P.Eng., Lead Process Engineer, Primero Group Americas

Mr. Porfirio Cabaleiro Rodriguez, FAIG, Senior Director GE21

Mr. Brian Talbot, FAusIMM,

 

2.4Site Visits

 

The following Qualified Persons visited the Project site.

 

Mr. Marc-Antoine Laporte visited the Project site on September 11–15, 2017, from July 11–17, 2018, from September 18-23, 2018, and October 18-21, 2021. During the 2017 site visit, Mr. Laporte conducted a general review of the logging and QA/QC procedures in place for the 2017 drill program. Drill hole collars were visited, and selected collar positions checked with a hand-held global positioning system (GPS) instrument. An inspection of the drilling equipment and deviation survey methodology and tools was completed. Mr. Laporte took 26 witness (control) samples from the remaining 2014 Xuxa campaign drill core to submit for independent confirmation of the presence of lithium-bearing mineralization. During the July 2018 site visit a general review of the logging and QA/QC procedure was conducted with Sigma geologists to confirm compliance with industry best practices. Drill hole collars at Xuxa, Barreiro and Lavra Do Meio were inspected, and selected collar positions checked with a hand-held GPS instrument. An extensive review of the mineralized core from the four main pegmatite was conducted during the first two days of the visit including discussion of the sampling method with technical staff. Inspection of the drilling equipment and deviation survey methodology and tools between the two drilling companies was also completed to check consistency between the drill teams. One day was spent on the Sao Jose property to inspect the different historical mine workings and make recommendations for future drilling. Mr. Laporte visited the site again in September 2018, where he discussed the geological model and information needed to complete the resource estimates on the Xuxa, Barreiro, Murial and Lavra do Meio pegmatites. On his site visit in 2021, Mr. Laporte reviewed logging, QAQC and the drilling program underway at the Barreiro deposit. He also discussed the geological model and the information needed to update the MRE for Barreiro.

 

Mr. Porfirio Cabaleiro Rodriguez visited the site from April 17-18, 2019. During this visit, he familiarized himself with general aspects of the proposed mine area, and locations for future waste pile areas and the planned plant site area. Mr. Rodriguez observed the possible influence of the Piauí River on the planned pits, and the general aspects of rock behavior based on the observation of excavations.

 

2.5Information Source

 

Sigma provided the financial model for the economic study. Primero has reviewed the model and input files for alignment with the Project input data.

 

21501-REP-PM-001
Page | 54

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

3RELIANCE ON OTHER EXPERTS

 

3.1Marketing

 

The QP has fully relied upon, and disclaims responsibility for, marketing information derived from a third-party expert retained by Sigma through the following document:

 

Benchmark Mineral Intelligence, Q1-2022: Lithium Forecast, Q1-2022.

 

This information is used in Section 19, the Mineral Reserve estimate in Section 15, and the financial analysis in Section 22.

 

The QP considers it reasonable to rely on Benchmark Mineral Intelligence because the company is independent, privately owned, and is an industry leader in battery metals reporting. Benchmark Mineral Intelligence, founded in 2014, is a London-based IOSCO-regulated Price Reporting Agency and specialist information provider for the lithium-ion battery to EV supply chain. Benchmark Mineral Intelligence specialises in providing in depth market reports that give a comprehensive analysis of an individual metal or mineral market. These reports cover world supply and demand, the operations of the major producers, end-use market applications, price trends, international trade patterns and forecasts. Benchmark Mineral Intelligence also publishes regularly updated cost curves and databases for a number of metals and minerals.

 

The QP has fully relied upon, and disclaims responsibility for contract and off-take information derived from Sigma through the following documents:

 

Sigma’s announcement on April 10, 2019, of the Sigma and Mitsui Binding Heads of Agreement. (Heads of Agreement - Lithium concentrate offtake dated March 25, 2019)

Sigma’s announcement on October 5, 2021, of the Sigma and LG Energy Solution, Ltd. Binding Offtake Agreement Term Sheet (Term Sheet - Lithium concentrate offtake dated October 5, 2021)

 

This information is used in Section 19, and in support of the Mineral Resource estimate in Section 14, the Mineral Reserve estimate in Section 15, and the financial analysis in Section 22.

 

3.2Units and Currency

 

Système International d'unités (SI) metric units are used, including metric tonnes (tonnes, t) for weight.

 

All currency amounts are stated in US dollars (US$) unless otherwise stated.

 

3.3Environmental, Permitting and Social Licence

 

The QP has fully relied upon, and disclaims responsibility for, environmental, permitting, and social licence information derived from third-party experts retained by Sigma through the following document:

 

Environmental Regularization Summary – Xuxa Project - DNPM 824 692 71: report prepared by Harpia Consultoria Ambiental for Sigma, 2019.

Vetor Ambiental updated the report for the Phase 1 Project in 2020 and for Phase 2 in 2021.

 

This information is used in Section 20, and in support of the Mineral Resource estimate in Section 14, the Mineral Reserve estimate in Section 15, and the financial analysis in Section 22.

 

This Environmental Regularization Summary for Phase 1 Xuxa by Harpia Consultoria Ambiental is a translation from and is based on an Environmental Impact Assessment (EIA) prepared by NEO Soluções Ambientais, ATTO GEO Geologia e Engenheria and Vetor Ambiental and submitted by Sigma to applicable regulatory authorities.

 

21501-REP-PM-001
Page | 55

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Similarly, the Environmental Regularization Summary for Phase 2 Barreiro is based on an Environmental Impact Assessment (EIA) prepared by Vetor Ambiental and submitted by Sigma to applicable regulatory authorities.

 

The EIS was comprised of:

 

Estudo e Relatorio de Impacto Ambiental Phase 1 North Pit – EIA-RIMA dated 30 October 2018

Plano de Controle Ambiental Phase 1 North Pit– PCA dated December 2018

Estudo e Relatorio de Impacto Ambiental Phase 1 south pit – EIA-RIMA dated 28 August 2020, and

Plano de Controle Ambiental Phase 1 south pit – PCA dated 28 August 2020

Estudo e Relatorio de Impacto Ambiental Phase 2 Barreiro t – EIA-RIMA dated 20 February 2022, and

Plano de Controle Ambiental Phase 2 Barreiro – PCA dated 15 March, 2022

 

The Phase 2 Barreiro Environmental Regularization Summary is based on an EIA-RIMA and PCA which was prepared by Vetor Ambiental.

 

This information is used in Section 20, and in support of the Mineral Resource estimate in Section 14, the Mineral Reserve estimate in Section 15, and the financial analysis in Section 22.

 

The EIA and the Environmental Regularization Summary for Phase 1 cover the licensing process for Xuxa North & South pits and waste piles 1 ,2 ,3 and 4. The EIS and the Environmental Regularization Summary for Phase 2 cover the licensing process for Barreiro pit and waste pile 1.

 

3.4Taxation

 

The QP has fully relied upon, and disclaims responsibility for taxation (including amortization, interest rates, depreciation, discounts), levy, royalty, and buy-back options information derived from third-party experts retained by Sigma including the following document:

 

Sigma Legal Opinion – SUDENE and RECAP tax incentives: legal opinion prepared by Lefosse Advogados 25 March 2019.

Import and Local taxes opinion was prepared by TSX Engineering December 2021

 

This information is used in Section 22, and in support of the Mineral Reserve estimate in Section 15.

 

3.5Mineral Tenure

 

The QPs have not reviewed the mineral tenure, nor independently verified the legal status, ownership of the Project area, underlying property agreements or permits.  The QPs have fully relied upon, and disclaims responsibility for, information derived from third-party experts retained by Sigma through the following document:

 

Friere, W., Costa, B., Soarres, D.R., and Azevedo, M., 2018:  Legal Opinion 29/2018:  report prepared by William Freire and Partners for Sigma, 10 April 2018, 68 p.

 

This information is used in Section 4 of the report, and in support of the Mineral Resource estimate in Section 14, the Mineral Reserve estimate in Section 15, and the financial analysis in Section 22.

 

21501-REP-PM-001
Page | 56

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

4PROPERTY DESCRIPTION AND LOCATION

 

4.1Property Description and Location

 

The Project area is located within Zone SE24 of the Americas topographic map reference, and is divided into four properties:

 

Grota do Cirilo property: UTM 190,615 m east and UTM 8146,788 m north; WGS 84, Zone 24S

Genipapo property: UTM 191,226 m east and UTM 8,155,496 m north, WGS 84, Zone 24 K

Santa Clara: UTM 197,682 m east and UTM 8,134,756 m north, WGS 84, Zone 24 K

São José property: UTM 190,612 m east and UTM 8,119,190 m north, 84, Zone 24 K.

 

The property locations are shown in Figure 4-1.

 

 

 

Figure 4-1 – Project Properties - Genipapo, Grota do Cirilo, Santa Clara and São José

 

21501-REP-PM-001
Page | 57

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

4.2Mineral Tenure

 

The legal framework for the development and use of mineral resources in Brazil was established by the Brazilian Federal Constitution, which was enacted on October 5, 1988 (the Brazilian Constitution) and the Brazilian mining code, which was enacted on January 29, 1940 (Decree-law 1985/40, later modified by Decree-law 227, of February 29, 1967, the Brazilian Mining Code).

 

According to the Brazilian Constitution, all mineral resources in Brazil are the property of the Federal Government. The Brazilian Constitution also guarantees mining companies the full property of the mineral products that are mined under their respective concessions. Mineral rights come under the jurisdiction of the Federal Government and mining legislation is enacted at the Federal level only. To apply for and acquire mineral rights, a company must be incorporated under Brazilian law, have its management domiciled within Brazil, and its head office and administration in Brazil.

 

In general, there are no restrictions on foreign investment in the Brazilian mining industry, except for mining companies that operate, or hold mineral rights within a 150 km-wide strip of land parallel to the Brazilian terrestrial borders. In this instance the equity interests of such companies have to be majority Brazilian-owned. Exploration and mining activities in the border zone are regulated by the Brazilian Mining Code and supporting legislation.

 

The Project consists of 25 mineral rights, mining concessions, applications for mining concessions and exploration permits covering an area of 18.424,21 ha in four property areas (refer to Figure 4-1). The tenure holdings are summarized in Table 4-1 and tenure outlines are shown in Figure 4-2. The identification numbers used in Figure 4-2 correspond to the identification numbers in the first column of Table 4-1. A summary of the types of concession within each property area is provided in Table 4-2.

 

21501-REP-PM-001
Page | 58

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 4-1 – Mineral Rights Description

 

ID Number Year Type Expiry Date Area Associated
Property
(ha)
1 802.401 1972 Mining concession (*) Life of mine 1,796.5 Genipapo
2 802.400 1972 Mining concession (*) Life of mine 969.13 Genipapo
3 4.134 1953 Mining concession (*) Life of mine 494.69 Grota do Cirilo
4 831.891 2017 Exploration Permit 17/07/2023 (**) 10.57 Genipapo
5 830.039 1981 Mining Application Life of mine 715.24 Grota do Cirilo
6 824.692 1971 Mining concession Life of mine 756.21 Grota do Cirilo
7 810.345 1968 Mining concession (*) Life of mine 125.54 Grota do Cirilo
8 9.135 1967 Mining concession (*) Life of mine 312 Grota do Cirilo
9 5.804 1953 Mining concession (*) Life of mine 9.33 Grota do Cirilo
10 804.541 1971 Mining Application Life of mine 44.89 Grota do Cirilo
11 824.695 1971 Mining concession (*) Life of mine 1,069.2 Grota do Cirilo
12 805.799 1970 Mining concession (*) Life of mine 8.29 Grota do Cirilo
13 801.312 1972 Mining concession (*) Life of mine 2,505.22 Grota do Cirilo
14 831.975 2017 Exploration Permit 19/03/2023 (**) 4.03 Grota do Cirilo
15 2.998 1953 Mining concession (*) Life of mine 327.84 Santa Clara
16 801.870 1978 Mining concession Life of mine 544.9 Santa Clara
17 801.316 1972 Mining concession (*) Life of mine 3,727.9 Santa Clara
18 801.315 1972 Mining concession (*) Life of mine 991.71 Santa Clara
19 813.413 1973 Mining concession (*) Life of mine 379.31 Santa Clara
20 832.889 2013 Extension Exploration Permit 02/12/2022 (**) 810.23 São José
21 806.856 1972 Mining concession (*) Life of mine 1,920.4 São José
22 808.869 1971 Mining concession (*) Life of mine 29 São José
23 804.088 1975 Mining concession Life of mine 29.22 São José
24 801.875 1978 Mining concession Life of mine 281.51 São José
25 830.580 1979 Exploration Permit N/A*** 686.89 São José

 

 

* Mining rights covered by the Mining Group 931.021/83.

   
  **Deadline for submission to the ANM of the final research report
   
  *** The Final Research Report was submitted in due time and is pending analysis. There is no provision for an administrative decision.

 

21501-REP-PM-001
Page | 59

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

 

Figure 4-2 – Project Mineral Rights, North and South Complexes

 

21501-REP-PM-001
Page | 60

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 4-2 – Property Tenure Summary

 

Property

Area
(
ha)

Concessions Historical
Workings
Grota do Cirilo 5,919 8 mining concessions, 2 Application for mining concession, 1 exploration permit Xuxa, Barreiro, Lavra do Meio, Murial and Maxixe
São José 3,757 4 mining concessions and 2 exploration permits Samambaia, Lavra Grande, Ananias, Ramom and Lavra Antiga
Genipapo 2,776 2 mining concessions and 1 exploration permit Morundu and Lavra Velha
Santa Clara 5,971 5 mining concessions Lavra do Honorato

 

All concessions have been surveyed on the ground and have been monumented (physical boundary markers are in place). Sigma retains third-party consultants to monitor its concession obligations. The consultants report on both a monthly and a quarterly basis.

 

The following payments and fees are required to keep concessions current:

 

ANM Proceeding 802.401/1972, 802.400/1972, 4.134/1953, 824.692/1971, 810.345/1968, 9.135/1967, 5.804/1953, 824.695/1971, 805.799/1970, 801.312/1972, 2.998/1953, 801.870/1978, 801.316/1972, 801.315/1972, 813.413/1973, 806.856/1972, 808.869/1971, 804.088/1975, 801.875/1978 (mining concessions): Financial Compensation for the Exploration of Mineral Resources (CFEM) will only be due when there is mineral production in the areas. For the sale of lithium, the value of CFEM is equivalent to 2% of gross sales revenue, less taxes levied on its sale

ANM Proceeding 830.039/1981, 804.541/1971 (Mining Application): there is no periodic payment due

ANM Proceeding 850.580/1979 (Exploration permit with Final report delivered): there is no periodic payment due

ANM Proceeding 832.889/2013, (Extension Exploration Permit): The annual payments due at the annual fees per hectare (TAH) were made, totaling the amount of R$4,318.54 (about $US827)

ANM Process 831.891 / 2017, 831.975 / 2017, (Original Exploration Permit): The annual payments due at the annual fees per hectare (TAH) were made, totaling the amount of R$ 51.83 (about $US9.80)

The TAH is due in January, for permits granted from July to December of the previous year, and in July, for permits granted from January to June of the present year. Currently the TAH is R$3.55/hectare for original exploration permits and R$5.33/hectare for renewed exploration permits Sigma has seven mining concessions that have had Economic Exploitation Plan (Plano de Aproveitamento Econômico - PAE) approved, covering the Xuxa, Barreiro, Lavra do Meio, Murial, Maxixe and Nezinho do Chicâo deposits within the Grota do Cirilo property.

 

21501-REP-PM-001
Page | 61

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

4.3Surface Rights

 

Under Brazilian laws, foreign entities may not own a controlling interest in surface rights. The surface rights in the Grota do Cirilo area, the current primary focus of activity, are held by two companies, Arqueana Minérios e Metais (Arqueana) and Miazga Participações S.A. (Miazga) and certain areas are held under private ownership. The controlling interest in Sigma, the A10 Investment Fund, is also the controlling interest in Arqueana and Miazga. Through these affiliations with Sigma, landowner agreements have been negotiated with these entities to support Sigma’s exploration and development activities within the Grota do Cirilo property. As required for reconnaissance exploration purposes, Sigma has negotiated exploration access in the remaining property areas.

 

4.4Agreements

 

SMSA has entered into two rights-of-way agreements with Arqueana and Miazga. There are no conditions attached to the agreements.

 

4.5Royalties and Encumbrances

 

4.5.1CFEM Royalty

 

The Brazilian Government is entitled to a Compensação Financeira pela Exploração de Recursos Minerais (CFEM) royalty. The holder of a mining concession for lithium mineral must pay the Brazilian government 2.0% of the gross income from the sale thereof. The only deductions allowed are taxes levied on commercial sales.

 

4.5.2Royalty Agreements

 

There are two net smelter return (NSR) royalties.

 

The first provides for a net smelter return, calculated at the rate of 1% over the gross revenues of SMSA, less all taxes and costs incurred in the process of extraction, production, processing, treatment, transportation and commercialization of the products sold. SMSA has a purchase option, exercisable anytime, for the price of US$3,800.000. The royalty has a sales option, for the same price, exercisable as follows:

 

When SMSA enters into commercial production and has reached a threshold of 40,000 t of mineral products concentrates per year; or

 

The original controlling group ceases to have more than 30% of SMSA. The “original controlling group” reference is to the A10 Investment Fund that currently controls Sigma.

 

The second royalty provides for an NSR royalty calculated at the rate of 1%, over the gross revenues of SMSA, less all taxes and royalties payable to government authorities, any discounts or sales commissions paid, and any insurance or freight cost borne by SMSA. There is no buyout provision for this royalty.

 

Sigma intends to exercise its buyback option on the first NSR royalty in its first year of commercial production at the Project.

 

4.6QP Comment

 

To the extent known, there are no other significant factors and risks that may affect access, title, or the right or ability to perform work on the Project that have not been discussed in this Report.

 

21501-REP-PM-001
Page | 62

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

5ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND PHYSIOGRAPHY

 

5.1Accessibility

 

The Project is located in northeastern Minas Gerais State, in the Municipalities of Itinga and Araçuaí, approximately 25 km east of the town of Araçuaí and 450 km northeast of Belo Horizonte.

 

The Project is well served by a public and private road network, as a result of its proximity to National Road 367. The Project is accessible year-round by a network of arterial and back country service roads.

 

National route BR 251 accesses the Port of Vitoria in the State of Espirito Santo, some 700 km from the Project site. This port could represent a potential port of export for any spodumene production from the Project. The national road BR116 and BR415 accesses to Ilhéus Port which is 540km from the project and is also an option for Sigma.

 

5.2Climate

 

The region is characterized by a dry, semi-arid and hot climate. It has a temperature mean of 24.5ºC and a low annual average rainfall of 750 mm. There is a pronounced dry season with the driest month being June. The wettest month is November. There is no cold season.

 

Exploration activities are currently conducted year-round. It is expected that any future mining activities will also be year-round.

 

5.3Local Resources and Infrastructure

 

When Sigma purchased Arqueana Minérios e Metais Arqueana (Arqueana; see discussion in Section 6), had been in operation since the 1970s. In common with many brownfield projects, the Grota do Cirilo property has substantial infrastructure constructed to support mining activities. This includes provision of power supply and a site power substation, an extensive office block equipped with internet and telephones, accommodation for 40 persons on site, dining hall and kitchen, workshop, on-site laboratory and sample storage building, warehouse, core storage, a fuel storage facility with pumping equipment, and a water pumping facility from the Jequitinhonha River with its own reservoir. The main 138kV transmission line from the Irape hydro power station runs through the northern part of the Project area. Figure 5-1 is an aerial photograph showing the infrastructure in the pilot plant/office site area. The Project main office is shown in Figure 5-2. Figure 5-3 is a photograph showing the layout of the original 2014 Sigma pilot plant. Figure 5-4 shows the current pilot plant layout.

 

Additional information on the infrastructure envisaged is provided in Section 18.

 

The nearest larger communities are Itinga and Araçuaí with populations of 14,000 and 40,000 respectively. Araçuaí is serviced by the local municipal airport and by mobile phone network from the principal Brazilian service providers. The closest major domestic airport is located at Montes Claros, 327 km west of Araçuaí.

 

21501-REP-PM-001
Page | 63

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

 

Figure 5-1 – Aerial View, Current Project Infrastructure

 

Note: Drone view, flight dated September 2018, image looks northeast, photographic still image by Sigma. The core storage facility (labelled 2 on the image) provides a scale indicator and is about 30 m wide and 45 m long. Due to the elevated perspective view, no other reliable scale indicator can be provided. The infrastructure is located in the tenure numbered “3” in Figure 4-2 and Table 4-2.

 

 

 

Figure 5-2 – Field Office (location 6 in Figure 5-2)

 

Note: Drone view, flight dated September 2018, image looks east, photographic still image by Sigma. Vehicles provide scale indicator. Due to the elevated perspective view, no other reliable scale indicator can be provided.

 

21501-REP-PM-001
Page | 64

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

 

Figure 5-3 – SMSA Pilot Plant

 

Note: Photograph taken by Sigma, 2014. Images shows the heavy mineral pilot plant in operation. At the time, the plant was processing material to recover tantalite and cassiterite. It consisted of a 10 tonne per hour water pulse jig (the green structure), two crushers, a jaw crusher and roll crusher.

 

 

 

Figure 5-4 – Lithium Metallurgical Test Phase Production Plant

 

Note: Drone view, flight dated September 2018, image looking east–southeast, photographic still image by Sigma. The core storage facility (silver roof at top right of image) provides a scale indicator and is about 30 m wide and 45 m long. Due to the elevated perspective view, no other reliable scale indicator can be provided.

 

21501-REP-PM-001
Page | 65

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

5.4Physiography

 

The Project topography consists of gently rolling hills with less than 100 m difference in elevation. The hilltops are covered with a veneer of alluvium, up to 5 m thick, which is not present on the hill slopes where bedrock is frequently exposed.

 

The Jequitinhonha River and the Araçuaí River join west of the Project and the Jequitinhonha River passes through the Grota do Cirilo property in close proximity to the Sigma offices, as shown in Figure 5-1.

 

The Project area is characterized by thick thorn scrub and trees of medium height - except where it has been cleared for agriculture. The natural vegetation on the hilltops is typical of savannah grassland (Figure 5-5).

 

 

 

Figure 5-5 – Photo Showing Typical Vegetation Within Project Area

 

Note: The photograph looks north. The image is taken in the licence labelled as “6” in Table 4-2 and
Figure 4-2. Due to the photographic perspective view, no reliable scale indicator can be provided.

 

21501-REP-PM-001
Page | 66

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

6HISTORY

 

6.1Project History

 

The exploration history for the Project is summarized in Table 6-1.

 

Table 6-1 – Project History

 

Operator Year Comment
Companhia Estanìfera do Brazil (CEBRAS) 1957 – 1980s Tin production consisting of a, cassiterite/tantalite concentrate with by-products of feldspar and lithium minerals.  Mining focused on near surface, weathered zones, excavations ranged from 100–700 m in length.  CEBRAS operated a gravity separation plant, consisting of a jaw crusher, a trommel and cone crusher, with sizing screens and jigs to recover tantalite/cassiterite concentrate.  Feldspar and the lithium minerals, spodumene, lepidolite, amblygonite and petalite, were handpicked before the jaw crusher.
Arqueana Minérios e Metais (Arqueana) 1980s – 2000s Produced a 6–6.5%% Li2O spodumene concentrate and a 3.5-4% Li2O petalite concentrate.  No systematic exploration was conducted.  Historic mining occurred primarily where the bedrock had been exposed by erosion, on hill flanks.  Following the death of the owner of Arqueana, artisan-level operations continued.  The focus was on feldspar, petalite, ornamental-grade tourmaline and quartz. This was further reduced, after some years, to the underground mining of minor amounts of tantalite and gemstone.
Tanex Resources plc (Tanex; a subsidiary of Sons of Gwalia Ltd (Sons of Gwalia) 2000 – 2003 Channel sampling, air-track drilling, 13 reverse circulation (RC) drill holes.  Based on a report that has no location maps, it appears that Tanex and Sons of Gwalia drilled two drill holes at Lavra do Meio in 2000.  No other mentions of drill hole locations have been found.  In addition, Sigma has not been able to locate or any of the collar locations for the Tanex and Sons of Gwalia drilling on the ground.
Arqueana 2003 – 2012 Local workers continue production, but at a reduced rate.
RI-X 2012 Acquires a controlling interest in Arqueana, incorporates SMSA.  
Sigma 2012 to date Completes mapping, data compilation, ground magnetic survey, channel sampling.  Drill program in 2014 of 984m to initially investigate the Xuxa and Barreiro prospects.  Heavy mineral separation (HMS) pilot plant constructed in 2014–2015, consisting of a jaw crusher, roll crusher, sizing screen and pulse jig.  Acquired a dense media pilot plant in 2017 to produce lithium concentrate.  Completed drill program of 255 holes (approx. 42,310 m) in the Grota do Cirilo property area, on the Xuxa, Barreiro, Lavra do Meio, Maxixe and Murial prospects.  An internal Mineral Resource estimate was completed at Xuxa, Barreiro, Murial and Lavra do Meio.  The first public disclosure of a Mineral Resource estimate for Grota de Cirilo was in 2017 which was only for the Xuxa deposit. Updated resources for Xuxa and first-time estimate of Mineral Resources for Barreiro, Lavra do Meio and Murial were released in January 2019. A feasibility study for Xuxa was issued on the 18th of October 2019 with the Phase 1 mineral reserve statement. An updated feasibility study  for Xuxa and a preliminary economic assessment for Barreiro was issued on the 2nd of December 2021.

 

6.2Production

 

There are no verifiable production records for the Project area: based on the known size of the CEBRAS processing plant, about 500 t/d could have been extracted during CEBRAS operations.

 

The Arqueana operations are estimated to have produced about 29,700 t of tin–tantalum concentrate by 1995. Other production included potassium feldspar (113,402 t), albite (9,649 t), petalite (31,467 t), amblygonite (2,353 t), spodumene (1,317 t), tourmaline (1,429 t), beryl (91,971 t), epidote (5,603 t), and quartz (29,125 t).

 

Production from artisan and small-miner activity is unknown. Sigma has had no commercial production from the Project.

 

21501-REP-PM-001
Page | 67

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

7GEOLOGICAL SETTING AND MINERALIZATION

 

7.1Regional Geology

 

The Project area lies in the Eastern Brazilian Pegmatite Province (EBP) that encompasses a very large region (about 150,000 km2) of the States of Bahia, Minas Gerais, and Rio de Janeiro. Approximately 90% of the EBP is located in the eastern part of Minas Gerais state.

 

The pegmatite swarm is associated with the Neoproterozoic Araçuaí orogeny. Granitic rocks that formed during the Araçuaí orogeny have been separated into five different supersuites, coded as G1, G2, G3, G4 and G5. The granite intrusive events are interpreted to have formed during a collisional episode related to the Gondwana Supercontinent (Trans-Amazonian event). The granite supersuites range in age from pre-collisional (G1 at 630–585 Ma) to post collisional (G4 and G5 at 535–490 Ma). The pegmatite swarm is interpreted to be related to the G4 supersuite, in particular, the Piaui batholith (Soares et al, 2009). Figure 7-1 is a regional-scale schematic geological plan.

 

7.2Local Geology

 

Figure 7-2 is an overview plan of the geology of the northern project area.

 

7.2.1Biotite–Cordierite Schist

 

The host rock to the pegmatitic intrusions is a medium-grey coloured biotite–quartz schist, which is interpreted to be a metamorphosed flysch of the Eocambrian Salinas Formation (Quéméneur and Lagache, 1999). The schist typically has millimetre to centimetre-size cordierite porphyroblasts and finely disseminated, stretched, iron-sulphide crystals with a preferred orientation that is sub-parallel to the foliation. Minor intercalations of calcsilicate rocks can occur within the schist.

 

Where weathered, the schist may display sericite-rich zones and micro-crystalline quartz–calcite intercalations that include dark green, disseminated, sub- to millimetre-sized amphibole and pink garnet crystals.

 

7.2.2Pegmatites

 

Pegmatites are generally divided into two main types:

 

Anatectic (directly formed from the partial melting of the country rock)

Residual pegmatite (fluid rich silicate melts resulting from the fractional crystallization of a parent magma).

 

The pegmatites in the Project area are interpreted to be residual pegmatites and are further classified as representative of lithium–cesium–tantalum or LCT types.

 

21501-REP-PM-001
Page | 68

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

 

 

Figure 7-1 – Regional Geologic Map (after Pedrosa-Soares et al., 2001)

 

 

21501-REP-PM-001
Page | 69

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

 

 

Figure 7-2 – Local Geology Map, Northern Complex

 

Pegmatites in the Araçuaí and Itinga district tend to be tabular in shape, with widths, thicknesses and lengths that vary widely. The dikes typically have sharp contacts with the schist host rock and have a discontinuous, thin, fine-grained (chilled margin) border zone. They do not display classic concentric zoning around a quartz core (e.g. Simmons et al, 2003), instead, the Araçuaí and Itinga district dikes display a characteristic layered anisotropic internal fabric (London, 1992).

 

In the general Project district, pegmatites are typically hosted by a medium-grey, biotite–quartz schist. The pegmatites are generally concordant with the schist foliation, which is coincident with the overall strike of the schists. The pegmatite–schist contacts display recrystallization features such as biotite eyes within cordierite masses, and development of millimetre-sized, black tourmaline needles that are almost always perpendicular to the shale foliation.

 

21501-REP-PM-001
Page | 70

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Spodumene can form 28–30% of the pegmatite mass, microcline and albite contents range from 30–35%, with microcline content dominant over albite, muscovite comprises about 5–7% and the remainder of the rock mass consists of quartz. The pale green-coloured spodumene crystals are elongate or tabular, ranging from millimetre to centimetres in scale, and have been observed at metre-scale in outcrop. Spodumene cuts the microcline matrix, and intergrowths of spodumene and quartz, sometimes in association with muscovite, are common. Accessory minerals, such as columbite and tantalite form in association with albite and quartz. Late-stage mineralization includes sphalerite and pyrite.

 

7.3Property Geology

 

7.3.1Grota do Cirilo Property

 

Figure 7-3 is a pegmatite location map for the Grota do Cirilo property, showing the mapped dike swarms and the locations of the Xuxa pegmatite and the five major known historical workings.

 

 

 

 Figure 7-3 – Historic Workings and Pegmatite Dike Swarms within Grota Do Cirilo Property

 

Note: Historical workings as yellow dots, and the strike of the Xuxa. Figure also shows location of Sigma’s office and camp complex.

 

7.3.1.1Xuxa

 

The host rock for the Xuxa pegmatite body is a biotite–quartz schist with a well-developed crenulation cleavage. Pegmatite xenoliths have been observed within the schist, with sizes ranging from a few centimetres to a metre. The pegmatite/schist contact is frequently hornfelsed.

 

The pegmatite is concordant with the regional foliation, striking northwest–southeast and dipping at 45–55º to the southeast. Drill data indicate the pegmatite has a strike length of 1,700 m, averages 12–13 m in thickness, and can reach as much as 20 m thick. It has been drill tested to 259 m vertical depth. It remains open to the west, east, and at depth.

 

21501-REP-PM-001
Page | 71

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Pegmatite mineralogy consists of the following minerals, with their approximate vein content: spodumene (20%), microcline and albite (40–45%), quartz (30%) and muscovite (5%). Spodumene occurs as pale green to colourless, elongated, tabular, crystals that can range in size from millimetre to as much as 80 cm in length and be as wide as 10 cm. The spodumene laths are set in a medium- to very coarse-grained groundmass of colourless albite, translucent quartz and pale grey perthitic microcline. Pale yellow–green medium- to coarse-grained muscovite micas may be present. Poikilitic textures of spodumene and quartz are common. Tantalite–columbite and cassiterite can occur in association with albite.

 

The Xuxa pegmatite dike is found on both sides of the Piaui River but does not crop out in the river valley. Two drill holes were angled to pass below the Piaui River, with one hole drilled from each bank. The drill holes intercepted pegmatite at depth. Core logging showed the spodumene to be weathered and contain replacement textures. The current interpretation is that the Piaui River occupy a fault trace, and that the interpreted fault has thinned the pegmatite body in that location.

 

Figure 7-4 shows a typical cross section through the Xuxa deposit.

 

 

 

Figure 7-4 – Xuxa Cross Section (looking northeast)

 

7.3.1.2Barreiro

 

The Barreiro pegmatite body is emplaced into biotite–quartz schist. Pale greenish–grey coloured, multi-centimetre-sized microcrystalline quartz–feldspar intercalations have been noted in the schist, with disseminated green, sub- to one-millimetre-sized amphibole and pink garnet crystals. Pegmatite xenoliths can be found within 3 m of the dike edge within the schist and can range from a centimetre to as much as a metre in size.

 

The pegmatite strikes northeast–southwest and dips to the southeast at 30–35º. Based on drill data, the dike is about 600 m long, 800 m wide, and has an average thickness of 30–35 m. It remains open to the northeast and at depth. The deepest drill hole reached 374 m. The pegmatite is apparently intruded discordant to the host crenulated biotite schist in surface exposures, but at depth, can be concordant, and emplacement may be related to local fracturing.

 

21501-REP-PM-001
Page | 72

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

The dike is slightly zoned into distinct spodumene-rich and albite-rich areas and is divided into an edge (or border), and a central zone. Overall, spodumene is about 20–24% of the dike mass, albite–microcline is approximately 32–40%, and around 10–18% is mica (muscovite).

 

The border zone is about 45 cm in thickness, and consists of fine-grained albite, quartz and muscovite. Heavy minerals such as cassiterite and tantalite may occur associated with albite units. The central zone is spodumene-rich and consists of albite and spodumene crystals that are typically 10–25 cm in length but can more rarely can attain as much as a metre in length. Spodumene crystals are also present as short, prismatic, elongated laths. The spodumene laths are colourless or pale green, sometimes displaying a poikilitic texture of fine- to medium-grained quartz and/or pale green sericite. Petalite occurs sporadically, as both colourless, translucent to transparent, coarse to very coarse-grained crystalline aggregates. It can also be present as cryptocrystalline, translucent masses.

 

Figure 7-5 shows a typical cross section through the Barreiro deposit.

 

 

 

Figure 7-5 – Barreiro Cross Section (looking northeast)

 

7.3.1.3Lavra do Meio

 

The host country rock to the pegmatite dike is a biotite–quartz schist and has similar features to the schist that hosts the Barreiro pegmatite. Garnet and tourmaline have developed near the pegmatite–schist contact.

 

21501-REP-PM-001
Page | 73

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

The dike is concordant with the schist foliation, strikes north–south and dips at 75–80º to the east. Based on drill data, the dike is about 300 m long, 250 m wide, and has an average thickness of 12–15 m. It remains open at depth, with the deepest drill hole reaching 270 m.

 

The pegmatite mineralization is moderately to highly homogeneous mostly in the centre and deeper part. The upper and lower contact zones are characterized by albite, quartz and mica. In the albite-rich border zone, tantalite and cassiterite can occur interstitial to fan-shaped albite lamellae. In the pegmatite core, medium, to very coarse-grained laths of typically pale green spodumene and coarse to very coarse-grained, colourless, translucent to transparent, petalite crystal aggregates and cryptocrystalline masses occur and compose around 20% of the lithium-bearing minerals. Both spodumene and petalite are set within a micro-fractured, medium to coarse-grained matrix composed of quartz, mica, albite and microcline. The micro-fractures are infilled with pyrolusite.

 

Figure 7-6 is a cross-section through the Lavra do Meio pegmatite.

 

 

 

Figure 7-6 – Lavra do Meio Cross Section (looking north)

 

7.3.1.4Nezinho do Chicao

 

The Nezinho do Chicão (NDC) pegmatite was discovered in the 1980s by Arqueana. It has been tested by a small pit, a number of exploration trenches and drilling (Figure 7-7).

 

21501-REP-PM-001
Page | 74

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

 

Figure 7-7 – Nezinho Do Chicao Cross Section (looking northeast)

 

The pegmatite is hosted in a biotite–quartz schist, which is similar to the schist described as hosting the Barreiro pegmatite.

 

The pegmatite body strikes nearly north-south (020º) and dips at 40-75º to the southeast. The dike is about 1,600 m long, 200 m wide and 20-30 m thick. It remains open to the north, south and at depth, with the deepest drill hole reaching 350 m.

 

The pegmatite shows a classic border, intermediate and central zones. The border zone tends to be more albite rich and the highest spodumene content is generally in the central zone. The NDC pegmatite is a high-grade mix of spodumene and petalite with a variable ratio depending on the thickness of the zone, but petalite can be found throughout the deposit.

 

7.3.1.5Murial

 

A similar biotite–quartz schist to that hosting the Barreiro pegmatite is host to the Murial pegmatite.

 

The pegmatite is a north–south striking body that has fluctuating westerly dips, ranging from 70–85º in the south of the dike, to a much shallower 25–35º in the north. It is about 750 m long, 200 m wide, and has an average thickness of 15–20 m. It remains open to the north, south, and at depth.

 

The southern part of the dike generally has lower lithium contents, and the pegmatite has a sub-vertical to nearly vertical orientation. To the north, the lithium concentrations increase, and the dike orientation changes to horizontal to sub-horizontal and becomes more planar in shape.

 

The pegmatite shows a border, intermediary and central zone. The border zone is enriched in albite, the intermediate zone is typically spodumene-rich, and the central zone contains both spodumene and petalite. The fine-grained border matrix can include tantalite and cassiterite mineralization.

 

A cross-section through the Murial pegmatite is provided in Figure 7-8.

 

21501-REP-PM-001
Page | 75

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

 

Figure 7-8 – Murial Cross Section (looking north)

 

7.3.2Sao Jose Property

 

The São José property hosts five historical workings: Ramon, Lavra Antiga, Lavra Grande, Samambaia and Ananias (Figure 7-9). The São José area is locally known for gem-quality spodumene crystals that are used in jewellery.

 

21501-REP-PM-001
Page | 76

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

 

Figure 7-9 – Historical Workings within São José Property

 

7.3.2.1Lavra Grande

 

The Lavra Grande pegmatite was mined from underground in two stopes targeting the alteration zone, with petalite as the primary mineralization target. The dike strikes east-west, is about 300 m long, and 20–25 m in width. It is near vertical, dipping at 75–80º to the north. Pegmatite mineralogy consists of spodumene, petalite, feldspar and quartz. Petalite crystals exhibit perfect crystalline habit and are rose in colour.

 

The country rock is a medium grey biotite-quartz-schist, occasionally exhibiting crenulation cleavage that may encompass, mm to cm sized coliform cordierite porphyroblasts and finely disseminated stretched iron sulphide crystals with a preferred orientation that is sub-parallel to the foliation. The weathered zone of the schist often includes enriched sericite zones and micro-crystalline quartz-calcite intercalations that include disseminated dark green sub to millimetre sized amphibole and pink garnet crystals, all within a gneissose fabric.

 

7.3.2.2Lavra Ramon

 

This area was historically mined using artisanal methods for spodumene and feldspar. The dike consists of a contact (border) zone and a central zone. The contact zone consists of a thin, leukocytic and competent edge, whereas the central zone is predominantly coarse-grained with very large crystals. The Ramon dike has crystals that can be as much as 1–2 m in length, and spodumene can be as much as 50% of the pegmatite mass
(Figure 7-10).

 

21501-REP-PM-001
Page | 77

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

 

Figure 7-10 – Macro Crystals at Lavra Ramon

 

Preliminary field work suggests the pegmatite is approximately 200 m long, 200 m wide, and 20 m thick and strikes N40ºW and dips 75º to the southeast. Country rock includes shale and gneiss. The strike of the country rock is N45ºW and the dip varies depending on distance to the granitic intrusions.

 

7.3.2.3Lavra Antiga

 

This area was historically mined using artisanal methods for spodumene and feldspar. The dike consists of a contact (border) zone and a central zone. The main minerals are spodumene, feldspar, and quartz. The structure is essentially divided into a contact zone and central zone. The contact zone is characterized by a thin, leukocytic and competent edge and the central zone is predominantly coarse grained with very large crystals.

 

Preliminary field work suggests the pegmatite is approximately 200 m long, 200 m wide, and 15 m thick and strikes N40ºW and dips 75º to the southeast. The strike of the country rock is N45ºW and the dip varies depending on distance to the granitic intrusions.

 

7.3.2.4Samambaia

 

The Samambaia pegmatite consists of a number of parallel intrusions (stacked pegmatites) with outcrop widths varying from 3–5 m in thickness. Three, parallel, stacked pegmatites can be identified over a 50 m interval in historical workings, with spodumene crystals clearly visible in the side-walls of the excavations. The pegmatite zone is estimated at 250 m long, striking northeast–southwest, and dipping at 45º to the southeast (Figure 7-11).

 

21501-REP-PM-001
Page | 78

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

 

Figure 7-11 – Samambaia Plan Map

 

The dike consists of a contact zone and a central zone. The contact zone consists of fine-grained, whitish, quartz–albite, whereas the central zone comprises spodumene, feldspar and quartz minerals. The central zone rock mass consists of about 25–28% spodumene, 40–45% feldspar, and 8–10% quartz. Country rock includes shale and gneiss. The strike of the country rock is N45ºW and the dip varies depending on distance to the granitic intrusions.

 

7.3.2.5Ananias

 

The historical workings consist of a small pit and a single underground stope. Lithium minerals are visible in the excavation walls. The pegmatite is about 200 m long, 20 m thick, strikes east-west, and dips at 60º to the south (Figure 7-12).

 

21501-REP-PM-001
Page | 79

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

 

Figure 7-12 – Ananias Plan Map

 

It consists of a central zone and a contact zone. The central zone primarily consists of 25–28% spodumene, 40–45% feldspar, 8–10% quartz and 10% mica. The contact zone comprises whitish, fine-grained quartz and albite. The dimensions of the pegmatite have not been estimated. The strike of the country rock is N45ºW and the dip varies depending on distance to the granitic intrusions.

 

7.3.3Genipapo

 

Only initial reconnaissance work has been performed on the Genipapo property, which has identified the Ilha Allegre, Jenipapo, Mario Gusmao and Sebastiano Dutra dikes, and small deposits identified by Arqueana as hosting tantalum–niobium–tin mineralization. Additional information is provided in Section 9-6. This area is not a current exploration focus.

 

7.3.4Santa Clara

 

Initial reconnaissance activities have identified the Marculino, Maroto, Jose Gonsales and Bolasha pegmatites as well as areas that Arqueana reported as hosting tantalum–niobium–tin mineralization. Additional information is provided in Section 9-6. This area is not a current exploration focus.

 

21501-REP-PM-001
Page | 80

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

8DEPOSIT TYPES

 

The deposits within the Project area are considered to be examples of LCT-type pegmatites.

 

The following deposit type descriptor for such pegmatites is summarized and abstracted from Bradley and McCauley (2013).

 

All known LCT pegmatites are associated with convergent-margin or collisional orogens. LCT pegmatite maxima at ca. 2650, 1800, 525, 350, and 100 Ma correspond to times of collisional orogeny and, except for a comparatively minor peak at 100 Ma, to times of supercontinent assembly. The largest known deposits are Archean in age (Viana and al, 2003).

 

LCT pegmatites represent the most highly differentiated and last to crystallize components of certain granitic melts. Parental granites are typically peraluminous, S-type granites, although some Archean examples are metaluminous, I-type granites. LCT pegmatites are enriched in the incompatible elements lithium, cesium, tin, rubidium, and tantalum, and are distinguished from other rare-element pegmatites by this diagnostic suite of elements. The dikes typically occur in groups, which consist of tens to hundreds of individual pegmatites and cover areas up to a few tens of square kilometres. LCT pegmatites are known to form as far as 10 km from the parental granite and the more distal the pegmatite, frequently the more fractionated. The most highly fractionated rare-element-enriched pegmatites only constitute 1–2% of regional pegmatite populations.

 

The dikes are commonly late syntectonic to early post-tectonic with respect to enclosing rocks. Most LCT pegmatites intruded metasedimentary rocks, which are often metamorphosed to low-pressure amphibolite to upper greenschist facies.

 

Individual pegmatites have various forms including tabular dikes, tabular sills, lenticular bodies, and irregular masses. They are significantly smaller than typical granitic plutons, and typically are of the order of tens to hundreds of metres long, and metres to tens of metres wide.

 

Most LCT pegmatite bodies show some sort of structural control. At shallower crustal depths, pegmatites tend to be intruded along anisotropies such as faults, fractures, foliation, and bedding planes. For example, in more competent rocks such as granites, pegmatites commonly follow fractures whereas pegmatites intruded into schists tend to conform to foliation. In higher-grade metamorphic host rocks, pegmatites are typically concordant with the regional foliation, and form lenticular, ellipsoidal, or tapered cylindrical bodies.

 

Lithium is mostly found in the silicates spodumene (LiAlSi2O6), petalite (LiAlSi4O10), and lepidolite (Li-mica, KLi2Al(Al,Si)3O10(F,OH)2). Lithium phosphate minerals, mainly montebrasite, amblygonite, lithiophilite, and triphylite, can be present in some LCT pegmatites. Tantalum mineralization predominantly occurs as columbite–tantalite ([Mn,Fe][Nb,Ta]2O6). Tin is found as cassiterite (SnO2). Cesium is mined exclusively from pollucite (CsAlSi2O6).

 

Most individual LCT pegmatite bodies are concentrically, though irregularly, zoned. However, there are unzoned examples known.

 

Within an idealized pegmatite, four main zones can be defined (Figure 8-1).

 

21501-REP-PM-001
Page | 81

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

 

Figure 8-1 – Generalized Schematic Representation LCT Pegmatite

 

These comprise:

 

Border: chilled margin just inside the sharp intrusive contact between pegmatite and country rock. Typically, a few centimetres thick, fine-grained, and composed of quartz, muscovite, and albite;

Wall: <3 m thick. Largest crystals <30 cm. Main minerals are albite, perthite, quartz, and muscovite. Graphic intergrowths of perthite and quartz are common. Can form economic muscovite concentrations that can be mined. Tourmaline and beryl may be present;

Intermediate: Term used to refer to everything between the wall and the core. These may be discontinuous rather than complete shells, there may be more than one, or there may be none at all. Major minerals include plagioclase and potassium feldspars, micas, and quartz. Can host beryl, spodumene, elbaite (tourmaline), columbite–tantalite, pollucite (zeolite), and lithium phosphates. Typically, coarser-grained than the wall or border zones;

Core: Often mono-mineralic quartz in composition. Perthite, albite, spodumene or other lithium aluminosilicates, and (or) montebrasite (lithium phosphate) may occur with the quartz.

 

LCT pegmatites crystallize from the outside inward. In an idealized zoned pegmatite, first the border zone crystallizes, then the wall zone, then the intermediate zone(s), and lastly, the core and core margin.

 

The QP considers that exploration programs that use the deposit model set out above would be applicable to the Project area.

 

21501-REP-PM-001
Page | 82

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

9EXPLORATION

 

9.1Introduction

 

Sigma began working on the Project in June 2012, focusing on a geological assessment of available field data to prioritize the 200 known pegmatites that occur on the various properties for future evaluation. A ranking table that highlighted pegmatite volume, mineralogy and Li2O and Ta2O5 grade was established.

 

Within the more prospective areas, Sigma concentrated its activities on detailed geological and mineralogical mapping of historically mined pegmatites, in particular, on the larger pegmatites, Xuxa and Barreiro. These dikes were channel sampled and subsequently assessed for their lithium, tantalum and cassiterite potential. This work was followed by bulk sampling and drilling. A comprehensive description of the work program was provided in Laporte (2018), from which the following information has been summarized and abstracted.

 

9.2Grids and Surveys

 

Landinfo, a Denver, Colorado-based company that specialises in satellite imagery, was contracted by SMSA to acquire a high-definition satellite image and prepare a digital elevation model (DEM) for the Grota do Cirilo property area. In 2017, a DEM was constructed specifically for the Xuxa pegmatite area, and in 2018, the DEM was extended to include all targets on the Grota do Cirilo property (Figure 9-1).

 

A 3D topographic survey and mapping of the various historically mined pegmatites was conducted using differential global positioning system (DGPS) instruments and total station equipment.

 

9.3Geological Mapping

 

Sigma concentrated its activities on detailed geological and mineralogical mapping of historically mined pegmatites.

 

9.4Channel Mapping

 

Sigma conducted a significant amount of channel sampling at the known historical mines and pegmatite outcrops on the Project from 2012 to 2014. A total of 544 channel samples were collected from 14 pegmatite bodies within the Grota do Cirilo property. Table 9-1 summarizes the channel sampling conducted during this time.

 

21501-REP-PM-001
Page | 83

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

 

Figure 9-1 – Grota do Cirilo Satellite Image

 

Table 9-1 – Channel Sampling Summary

 

Property Prospect Number of Samples
Grota do Cirilo Xuxa 5
Barreiro 151
Lavra do Meio 72
Murial 50
Sao Jose Lavra Grande 40
Total 318

 

The channel samples were collected along and/or across strike, to the stratigraphy, schistosity, mineralization or other visible continuous structure. Individual channel samples were 10 to 15 cm in width, and approximately 5 cm in depth and one metre in length. Sample weights were between 15 to 30 kg. Channels were taken at outcrops, historic trenches, and historic mine workings. Samples were taken from both the pegmatite and the schist host rock. The samples, were bagged, tagged and sent to the SGS Belo Horizonte laboratory for analysis. Check samples were sent to SGS Johannesburg for control purposes.

 

21501-REP-PM-001
Page | 84

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

An example of the channel sampling methodology is provided in Figure 9-2, and is photographed at the Murial workings.

 

 

 

Figure 9-2 – Channel Samples at Murial Mine

 

9.5Trench Sampling

 

Sigma generally followed up positive channel sampling results with trenching and collection of large bulk (500 to 1,000 kg) samples for evaluation of heavy mineral potential. Table 9-2 summarizes the trenching conducted during this time.

 

Table 9-2 – Grota do Cirilo Trench Sampling Summary

 

Area Number of Trenches
Barreiro 6
Lavra do Meio 3
Nzinho do Chicao 2
Mutamba 5
Gringo 6
Matinha 4
Costelao 5
Arueira 3
Acari 5
Total 39

 

21501-REP-PM-001
Page | 85

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

9.6Exploration Potential

 

The Grota do Cirilo property hosts a large swarm of pegmatites, with differing orientations and varying mineralogical compositions. The pegmatites can be separated into two classes:

 

Structurally concordant (having dips and strikes comparable to that of the regional foliation of the host schist host (azimuth 300–340° and dip 40–60°). Nearly all of the pegmatites (Costelão, Matinha, Mutamba, Joao Vaqueiro, Arueira, etc.) belong to the concordant class. They form intrusive bodies (dikes), typically being several hundred metres in length and from 3–20 m thick

Structurally discordant; having dips and strikes that cross-cut schist foliation. The Gringo (azimuth 140–170° dip -15–55°), Barbieri (azimuth 340° dip 90°) and Urubu are examples of discordant pegmatites.

 

The pegmatites which may support additional exploration activities in the Grota do Cirilo property are outlined in Table 9-3.

 

Table 9-3 – Grota do Cirilo Property Prospects

 

Prospect Description
Mutamba Concordant to wall rock foliation, mainly containing feldspar and heavy minerals, and the outcrop is 240 m in length with a width of 4-7 m, dipping azimuth 320–340° dip -45–55°.  Arqueana mined the pegmatite to approximately 5 m depth.
Maxixe One of the larger of the Arqueana excavations, commencing as an open pit, then being mined from underground.  The former open pit is about 150 m long, and 20 m wide.  The pegmatite dike strikes at 125–80º, and dips at 30–35º.  It is hosted in a medium-grey-coloured, fine-grained, cordierite prorphyroblast-bearing biotite–quartz schist
Gringo Discordant to the regional foliation, with high lithium content (spodumene/petalite).  The Gringo outcrop is more than 130 m in length, 2–7 m in width and the observed contact attitudes suggest that it may widen in depth.  Arqueana mined the pegmatite to approximately 5 m depth
Matinha Concordant (or close to concordant) with foliation and is composed mainly of feldspar.  The outcrop is 265 m in length, with a maximum width of 23 m, azimuth of 320° and dip -55° and steepens in the northeast to -90°).  Arqueana mined the pegmatite to approximately 10–12 m depth.
Costelão and Velho Costelão The Costelão and Velho Costelão pegmatites are closely located and are parallel in strike.  Both are concordant bodies but have different mineralogical composition.  Costelão is a Li (ambligonite) type pegmatite, with an outcrop length of 220 m and width of 11 m, az 330° dip -60°.  Velho Costelão is smaller in size: the outcrop is 7 m wide, an interpreted length of 100–150 m, az 340°, dip -75°.  The north-eastern part of the Costelão body was mined columbite–tantalite, cassiterite, quartz and feldspar.  The southwestern portion was exposed in several prospecting trenches and pits.  Velho Costelão was mined from two small underground stopes.

 

21501-REP-PM-001
Page | 86

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Prospect Description
Joao Vaqueiro Concordant to the regional host rocks.  It is spodumene/petalite-type pegmatite body.   The outcrop has been shown to be more than 15 m thick, azimuth 320° and dip -50°.
Arueira Concordant to the host rock.  This is a lepidolite-type pegmatite that is 250 m in length, 2–5 m in width, striking 320°, and dipping at -50°.  The pegmatite was open-pit mined by Arqueana and produced columbite–tantalite, cassiterite, lepidolite, quartz and feldspar.
Soldado Soldado (Grota Soldado) is famous in the area for its extremely high grades of heavy minerals (columbite–tantalite and cassiterite).  It is a slope deposit containing debris and blocks of pegmatite. In 2013, SMSA cleaned two old pits where garimpeiros had worked historically.  Large blocks of pegmatite and a number of smaller boulders were found in the basal layer of a Quaternary deposit, but the in-situ pegmatite was not located.
Tamburil The Tamburil pegmatite outcrop is around 7 m in width and 90 m length dipping at -60° to the east.  It is spodumene/petalite-type pegmatite body.  It has been open pit mined to a depth of 10 m.
Acari Located along strike from Tamburil.  It is an outcrop 9 m in width and 150 m in length and dips 60° to the east.  A well-developed lithium-bearing zone is visible on the south part of the outcrop that consists of a 4 m wide pocket of petalite.
Bee Mine The Bee Mine is situated close to the Tamburil deposits and 500 m north northeast of Nezinho do Chicão. The pegmatite is exposed in old trench and in a 7 m-deep shaft and shows spodumene crystals. The pegmatite hanging wall and footwall are not exposed in the trench.
Peneira The pegmatite is about 7–9 m thick and may be as much as 15 m thick.  It is about 200–250 m long.  It has been mined for columbite–tantalite, cassiterite, quartz and feldspar.  Spodumene and petalite form in the intermediate zone, and spodumene comprises about 20% of the pegmatite body.  The crystals are about 20–30 cm in length.  Petalite is formed associated to the grains and fractures of spodumene in small interstitial portions throughout the body and is a small percentage of the body.

  

Additional prospects and dikes that may warrant follow-up are provided in Table 9-4 for the Genipapo property and Table 9-5 for the Santa Clara property.

 

21501-REP-PM-001
Page | 87

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 9-4 – Genipapo Property Prospects

 

Prospect Description
IIha Alegre Located near the main road from Araçuaí-Itaobim, in the proximity of the Taquaral village. The body strikes southwest–northeast.  This pegmatite has a composition including feldspar, quartz, mica and black tourmaline, very similar to the Santa Clara pegmatites.
Jenipapo A dike approximately 10 m thick, concordant to wall rock (strike 325º, dip <75º).  The composition is predominantly feldspar with quartz and mica.  The body has been investigated by means of a single open pit to a depth of 5 m.
Lavra do Morundu A vertical pegmatite dyke approximately 30 m thick by 250 m long. It is discordant to the fabric of the country rock.  Heavy minerals including cassiterite and tantalite are recognizable in this pegmatite.
Mario Gusmão A narrow (<5 m thick) dike, concordant to wall rock (strike 330º, dip <65º), composed of feldspar with quartz, mica and abundant black tourmaline. This pegmatite has been mined by means of an open pit to a depth of approximately 10 m.  
Sebastiano Dutra A 10–20 m thick, >150 m long dike, concordant to wall rock (strike 330º, dip <65º).  The pegmatite exhibits well defined zoning: (i) feldspar with quartz and coarse mica wall zone; and (ii) feldspar (albite)–mica–quartz with columbite intermediate zone; and (iii) quartz core zone.  This pegmatite has been mined for gemstone via several open pits of up to 10 m depth.
Aprigio and Aprigio 2 These two pegmatites are located in proximity to each other and are concordant with the host rock fabric (320-45°).  The main minerals are feldspar–quartz–mica (muscovite and lepidolite), and secondary minerals include black tourmaline (afrisite). No heavy minerals were observed.
Apriginho The Apriginho pegmatite body is approximately 15–20 m wide and 60 m long.  The main minerals are 60–70% feldspar, 15% quartz, 10% mica and 5% petalite, with accessory tourmaline.  The body has small garimpeiro pits probably prospecting for tourmaline. The body is concordant with the host rock (340-75º).
Tedi This pegmatitic body is 150 m long, striking north-south.  The width of the pegmatite is unknown as the contact zones have not been exposed.  The main minerals are feldspar, quartz, mica (muscovite and lepidolite) and the secondary minerals include black tourmaline. Garimpeiro activity was noted during the prospecting visit.
Vicente Strikes east–west, with an 80º dip concordant to the host rock.  In the area there are some small open pits and underground workings.  The mineralogical composition of the bodies includes feldspar, quartz, mica and black tourmaline.
Bie Strikes 320º and dips 90º, concordant with the host rock.  The body was mined by means of an open pit 20 m wide and 70 m long.  The main minerals are feldspar, quartz, and mica (muscovite and lepidolite) and the secondary minerals include black tourmaline and cassiterite.

 

21501-REP-PM-001
Page | 88

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 9-5 – Santa Clara Property Prospects

 

Santa Clara Prospect Description
Honorato and Marculino The Honorato pegmatite is a 7–10 m wide dike, dipping discordantly to the host rock (strike 125º, dip <50º).  An old open pit on the dike is about 150 m long, and 5 m deep.  The Marculino pegmatite is located close to the Honorato body, probably dipping in different directions and with a combined length of around 600 m.  The Marculino pegmatite has been prospected by means of a number of small pits, most of them now collapsed.  The contact of the pegmatite with the host rocks is not visible, but according to pegmatite cleavage direction (az. 325º<40º), it seems to be concordant with the host rocks.  The mineral composition of the Marculino and Honorato pegmatites is typical for the Santa Clara area, with 60–70% feldspar, with quartz, mica and black tourmaline.  One sample from Honorato pit included small cassiterite crystals.
Maroto and Jose Gonsales The Maroto pegmatite body strikes north–south and is 300 m in length.  The Jose Gonsales pegmatite strikes east–west and is 200 m in length (according to historical map data).  The two pegmatites are adjacent to the Marculino dike, on the upper part of the same hill.  A large number of old pits and trenches with pegmatite debris were noted.
Bolacha and Antonio Preto The Bolacha and Antonio Preto pegmatite bodies both strike north–south and are approximately 200 m in length.  Prospecting was done by means of a series of pits. The pegmatite contains feldspar, quartz, mica and black tourmaline

 

In the southern complex area, Sigma geologists have visited sites of historical workings, and undertaken reconnaissance mapping and sampling activities. The Lavra Grande, Samambaia, Ananias, Lavra do Ramom and Lavra Antiga pegmatites were mined for spodumene, petalite, feldspar and heavy minerals, and in some cases gem-quality crystals were targeted. These pegmatites are considered to warrant additional work.

 

21501-REP-PM-001
Page | 89

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

10DRILLING

 

10.1Introduction

 

Sigma has conducted a number of drilling campaigns on the project since acquiring the property in 2012. To date, this drilling has concentrated on the Grota do Cirilo pegmatites. Table 10-1 is a drill summary table showing the drilling completed by Sigma until April 30th, 2022. A total of 409 core holes (71,538 m) were completed.

 

Table 10-1 – Total Sigma Drill Holes to April  30, 2022

 

Pegmatite/Area Number of
Drill Holes
Metres
Drilled
Xuxa 100 15,531
Barreiro 136 26,976
Murial 43 8,142
Lavra do Meio 17 2,189
Nezinho do Chicao 111 18,483
Maxixe 2 217
Total 409 71,538

 

10.2Drill Type

 

All drilling was core drilling at HQ core size (63.5 mm core diameter) to provide quality logging material, and in order to recover sufficient material for future metallurgical testing.

 

10.3Sigma Drilling Campaigns

 

10.3.1Xuxa

 

As of April 30th 2022, Sigma had completed a total of 100 diamond drill holes on Xuxa for 15,531 m (Table 10-2). All of the drilling to the end of 2018 was used in support of Mineral Resource estimation. The seven holes drilled in 2021 were confirmation drill holes and are not included in the current resource statement.

 

Table 10-2 – Total Xuxa Drilling

 

Year Number of
Drill Holes
Metres
Drilled
2014 9 649
2017 57 7,149
2018 27 6,178
2021 7 1,555
Total 100 15,531

 

21501-REP-PM-001
Page | 90

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

The 2014 drill program was undertaken by the Brazilian-based company Geosol, core was stored in locally made wooden boxes and transported to the company’s core sheds for logging and sampling. The average pegmatite intersection was 13.55 m and an average true thickness of 9.6 m was calculated. The true thickness, based on 2017-2018 drilling, increased to 13.6 metres

 

Ten percent of the holes at Xuxa have been drilled vertically and the remaining 90% are inclined at between 050º to 090º (average of 75º). The core holes are generally oriented at azimuth 145°, perpendicular to the general orientation of the pegmatite intrusions, and deviate slightly toward the west. Drill spacing is typically 50 m with wider spacing at the edges of the drill pattern. The drill hole intercepts range in thickness from approximately 85% of true width to near true width of the mineralization.

 

Illustrative intercepts through the deposit, showing examples of drill holes with low-grade intercepts, with high-grade intercepts and with higher-grade intercepts within lower-grade widths, are provided in Table 10-3. Figure 10-1 shows the locations of the drill collars. Figure 10-2 is a longitudinal section showing the general drill orientations.

 

Table 10-3 – Xuxa Example Drill Intercept Table

 

 

 

 

 

Figure 10-1 – Plan View of the Drilling at Xuxa (2017 blue collars and 2018 black collars)

 

21501-REP-PM-001
Page | 91

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

 

Figure 10-2 – Longitudinal View of the Drilling at Xuxa

 

10.3.2Barreiro

 

Drilling from 2014–2021 consisted of 136 HQ drill holes (26,976 m). The drilling is summarized by year in Table 10-4. All of the drill holes are used in Mineral Resource estimation.

 

Table 10-4 – Total Barreiro Drilling

 

Year Number of
Drill Holes
Metres
Drilled
2014 4 181
2017 2 234
2018 103 19,243
2021 27 7,318
Total 136 26,976

 

The drill holes were generally spaced between 50–100 m apart with 65% of the drilling being vertical and the remaining drill holes were drilled on a N310º azimuth. The drill-hole inclination ranged from 50º to 90º, and the deepest hole reached 350 m below surface. The average pegmatite intersection was about 42 m, resulting in a typical true thickness of 35-40 m.

 

Illustrative intercepts through the deposit, showing examples of drill holes with low-grade intercepts, with high-grade intercepts and with higher-grade intercepts within lower-grade widths, are provided in Table 10-5. A drill hole location plan for the drilling is provided in Figure 10-3, and a longitudinal view of the drill traces in Figure 10-4.

 

21501-REP-PM-001
Page | 92

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 10-5 – Barreiro Example Drill Intercept Table

 

 

 

Figure 10-3 – Plan View of the Drilling at Barreiro

 

21501-REP-PM-001
Page | 93

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 10-4 – Longitudinal View of the Drilling at Barreiro

 

10.3.3Lavra do Meio

 

During 2017–2018, Sigma completed 17 HQ core holes for 2,119 m. A drill hole summary table is provided in Table 10-6. All drilling is used in Mineral Resource estimation.

 

Table 10-6 – Total Lavra do Meio Drilling

 

Year Number of
Drill Holes
Metres
Drilled
2017 2 158
2018 15 1,961
Total 17 2,119

 

The core holes drilled at Lavra do Meio are generally vertical, perpendicular to the general orientation of the pegmatite intrusions, and have a variable deviation toward the south. Their spacing is typically 50 m with wider spacing at 75 m at the east and west edges of the drill pattern. The drill holes dips range from -60° to -70° with an average of -60° and the drill hole intercepts range in thickness from approximately 95% of true width to near true width of the mineralization.

 

Illustrative intercepts through the deposit, showing examples of drill holes with low-grade intercepts, with high-grade intercepts and with higher-grade intercepts within lower-grade widths, are provided in Table 10-7. Drill collar locations are included in Figure 10-5 in plan view, and a longitudinal section showing the drilling is included as Figure 10-6.

 

21501-REP-PM-001
Page | 94

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 10-7 – Lavra do Meio Example Drill Intercept Table

 

 

 

Figure 10-5 – Plan View of the Drilling at Lavra do Meio

 

21501-REP-PM-001
Page | 95

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 10-6 – Longitudinal View of the Drilling at Lavra do Meio

 

10.3.4Murial

 

Drilling in 2017–2022 totals 8,133 m in 43 HQ core holes. A drill hole summary table is provided in Table 10-8. Only the drill holes from 1 to 34 were used in the Mineral Resource estimation, holes 35-36-37 were completed after the database closeout date in 2018. the 2022 results will be use in the 2022 MRE update later this year.

 

Table 10-8 – Total Murial Drilling

 

Year Number of
Drill Holes
Metres
Drilled
2017 1 119
2018 36 6,485
2022 6 1,538
Total 43 8,142

 

The core holes drilled at Murial are generally vertical, perpendicular to the general orientation of the pegmatite intrusions, and deviate toward the south. The spacing is typically 50 m with wider spacing at 100 m at the eastern edge of the drill pattern. The drill holes dips range from 57° to 61° with an average of 60° and the drill hole intercepts range in thickness from approximately 95% of true width to near true width of the mineralization.

 

21501-REP-PM-001
Page | 96

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Illustrative intercepts through the deposit, showing examples of drill holes with low-grade intercepts, with high-grade intercepts and with higher-grade intercepts within lower-grade widths, are provided in Table 10-9. Drill hole collar locations are provided in Figure 10-7 and Figure 10-8.

 

Table 10-9 – Murial Example Drill Intercept Table

 

 

 

Figure 10-7 – Plan View of the Drilling at Murial

 

21501-REP-PM-001
Page | 97

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 10-8 – Longitudinal View of the Drilling at Murial

 

10.3.5Nezinho do Chicao

 

One hundred and eleven drill holes totalling 18,483 m have been completed at Nezinho do Chicao to April 30th 2022 (Table 10-10). Drilling has continued through the first five months of 2022. Table 10-11 provides illustrative intercepts through the deposit, showing examples of drill holes with low-grade and high-grade intercepts. The average grade over the five holes is 1.49% Li2O. Due the cut-off date, only the assay results of holes 1 to 103 were used for the 2022 MRE calculation.

 

Two of the holes at NDC have been drilled vertically and the remaining are inclined at between 060º to 090º (average of 65º). The core holes are generally oriented at azimuth 295°, perpendicular to the general orientation of the pegmatite intrusions. Drill spacing is typically 100 m with wider spacing at the edges of the drill pattern. The drill hole intercepts range in thickness from approximately 90% of true width to near true width of the mineralization.

 

Figure 10-9 shows the collar locations and Figure 10-10 is a longitudinal view of the drilling.

 

Table 10-10 – Nezinho do Chicao Drilling to December 1, 2021

 

Year Number of
Drill Holes
Metres
Drilled
2018 5 394
2021-2022 106 18,089
Total 111 18,483

 

21501-REP-PM-001
Page | 98

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 10-11 – Nezinho do Chicao Example Drill Intercept Table

 

 

 

Figure 10-9 – Plan View of the Drilling at Nezinho do Chicao

 

 

Figure 10-10: Longitudinal View of the Drilling at Nezinho do Chicao

 

21501-REP-PM-001
Page | 99

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

10.3.6Maxixe

 

Two drill holes totalling 217 m have been completed at Maxixe (Table 10-12). Figure 10-11 shows the collar locations.

 

Table 10-12 – Total Maxixe Drilling

 

Year Number of
Drill Holes
Metres
Drilled
2017 2 217
Total 2 217

 

 

Figure 10-11 – Maxixe Drill Hole Location Plan

 

10.4Drill Hole Logging

 

In each program core logging consisted of recording the following key information into Excel spreadsheets:

 

Lithology: description, colour, grain size, unit, code;

 

Alteration: code, intensity, type;

 

21501-REP-PM-001
Page | 100

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Mineralization: estimated spodumene %, major minerals (quartz, albite, microcline, amphibolite, muscovite, tantalite/columbite, cassiterite, biotite, tourmaline, cordierite), major mineral percentage;

 

Structures: veins, faults, shear zones, breccias, mineral lineation, lithological contacts;

 

Rock quality designation (RQD);

 

Recovery;

 

Magnetic susceptibility.

 

All core was photographed dry and wet.

 

10.5Recovery

 

Due to the hardness of the pegmatite units, the recovery of the drill core was generally excellent, and was typically cloes to 100%.

 

10.6Drill Surveys

 

Drill hole collars were picked up in the field using a Real Time Kinematic (RTK) GPS with an average accuracy of 0.01 cm.

 

All drill holes were down-hole surveyed by Sigma personnel using the Reflex EZ-Trac and Reflex Gyro instruments. Calibrations of tools were completed in every year on a regular basis.

 

10.7QP Comment

 

Sigma conducted HQ drilling programs in 2014, 2017, 2018, 2021 and 2022 on selected pegmatite targets. The drill programs have used industry-standard protocols that include core logging, core photography, core recovery measurements, and collar and downhole survey measurements. There are no drilling, sampling or recovery factors that could materially impact the accuracy and reliability of the results in any of the drill campaigns.

 

Information collected during the campaigns can be used to support Mineral Resource estimation at Xuxa, Barreiro, Lavra do Meio, Murial and Nezinho do Chicao.

 

21501-REP-PM-001
Page | 101

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

11SAMPLE PREPARATION, ANALYSES AND SECURITY

 

11.1Introduction

 

The descriptions in this section are based on information supplied by Sigma and observations made during the independent verification programs conducted at the Project site by SGS during September 11–15, 2017, July 11–17, 2018, September 18-23, 2018, October 18-21, 2021, and May 30 to June 01, 2022

 

The evaluation of the geological setting and mineralization on the Project is based on observations and sampling from surface (through geological mapping, grab and channel samples) and diamond drilling.

 

11.2Sampling

 

11.2.1Geochemical Sampling

 

Geochemical samples consisted of rock chip and grab samples taken from areas of outcrop. These were generally about 1 kg in weight.

 

11.2.2Channel Sampling

 

Channel samples were collected by cutting channels with a diamond-disc cutting machine. Typically, the cut channel measured 4 cm in width and 10 cm in depth. Each channel sample was generally 1 m long and cut directly from the outcrop, identified, numbered and then placed in a new plastic bag. Due to the hardness of the pegmatite units, the recovery of the channel material was generally very good, averaging more than 95%.

 

11.2.3Trench Sampling

 

Sigma generally followed up positive channel sampling results with trenching. This work was conducted from 2012 to 2014.

 

Trenches were typically 1 m wide, 0.5 m deep, and were dug at 2.5 m intervals across the entire pegmatite width from footwall to hanging wall. Full-width pegmatite samples were taken from each trench and aggregated to form 800–1,000 kg trench bulk samples for metallurgical test work.

 

11.2.4Core Sampling

 

Drill core of HQ size was placed in wooden core boxes and delivered daily by the drill contractors to the project core logging facilities at SMSA camp. The drill core was first aligned and measured by the technician and geologist for core recovery. The core recovery measurements were followed by the RQD measurements. After a summary review of the core, it was logged, and sampling intervals were defined by a geologist. Before sampling, the core was photographed using a digital camera and the core boxes were identified with box number, hole ID, and aluminium tags were used to mark the sample intervals.

 

Sampling intervals were determined by the geologist, marked and tagged based on lithology and mineralization observations. The typical sampling length was 1 m but varied according to lithological contacts between the mineralized pegmatite and the host rock. In general, 1 m host rock samples were collected from each side that contacts the pegmatite. The HQ drill core samples were split into two halves with one half placed in a new plastic bag along with the sample tag; the other half was replaced in the core box with the second sample tag for reference. The third sample tag was archived on site.

 

Copies of the Excel spreadsheets are stored on external hard drive and backed-up every day for security.

 

21501-REP-PM-001
Page | 102

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

11.2.5Metallurgical Sampling

 

HQ size drill core was collected from a portion of the 2017-2018 and 2020-2021 Xuxa drill programs for metallurgical purposes. The first half of the HQ drill core was selected for metallurgical testing. The second half was split in two quarters, one quarter placed in a new plastic bag along with the sample tag and the remaining quarter was replaced in the core box with the second sample tag for reference. The samples were then catalogued and placed in rice bags or pails, for shipping. The sample shipment forms were prepared on site with one copy inserted with the shipment, one copy sent by email to SGS Geosol, and one copy kept for reference. The samples were transported on a regular basis by SMSA driver by pick-up truck directly to the SGS Geosol facilities in Belo Horizonte. At SGS Geosol, the sample shipment was verified, and a confirmation of shipment reception and content was emailed to the Sigma CEO and project geologist.

 

For the 2020-2021 Barreiro metallurgical test work, SGS Lakefield utilized the 713 samples from Barreiro that they had on hand to produce four variability samples and one composite sample. After reviewing drill collar, survey, assay, and lithological data associated with the samples, they determined their sample selection criteria. Of the 713 samples on hand, 15 were discounted as they fell outside the known mineralization. The remaining 698 samples were divided into four variability samples based on lithium grade and petalite content. Sub-samples from each variability sample would then be blended to create a master composite.

 

11.3Density Determinations

 

Densities were measured by SGS Geosol using pycnometer measurement. Measurements were made by lithology with special attention to the lithium-bearing pegmatite. Separate measurements were made for the Xuxa, Barreiro, Lavra do Meio and Murial deposits.

 

A total of 220 measurements were made on Xuxa core from 2017-2021. Of the 220 measurements, 26 were made on albite-altered pegmatite, 69 on schist, and 121 on lithium-bearing pegmatite.

 

For Barreiro, a total of 470 measurements were made on core from the 2018 and 2021 drill program. Of the 470 measurements, 94 were made on albite-altered pegmatite, 206 on schist, and 164 on lithium-bearing pegmatite.

 

For Murial, a total of 134 measurement were on core from the 2018 drill program. Of the 134 measurements, 32 were made on the albite altered pegmatite, 58 on the schist and 44 on the lithium bearing pegmatite.

 

For Lavra do Meio, a total of 51 measurement were made on core from the 2018 drill program. Of the 51 measurements, 9 were made on the albite altered pegmatite, 22 on the schist and 20 on the lithium bearing pegmatite.

 

For NDC, a total of 292 lithium-bearing samples had density measurements calculated, comprising 196 spodumene samples and 96 petalite samples.

 

Table 11-1 shows the average specific gravity results for the lithium-bearing pegmatite for each of the deposits.

 

Table 11-1 – Specific Gravity of Lithium-Bearing Pegmatites

 

Deposit

Specific Gravity

g/cm3

Xuxa 2.70
Barreiro 2.71
Murial 2.69
Lavra do Meio 2.65
Nezinho do Chicao 2.68

 

21501-REP-PM-001
Page | 103

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

11.4Analytical and Test Laboratories

 

All samples collected by SMSA during the course of the 2012–2022 exploration programs relating to the Grota do Cirilo property were sent to SGS Geosol in Belo Horizonte, Brazil.

 

A portion of the 2017–2022 sample pulps were prepped by ALS Brazil Ltda. in Vespasiano, Brazil (ALS Vespasiano) and shipped to ALS Canada Inc. Chemex Laboratory (ALS Chemex) in North Vancouver, BC, Canada for cross check validation.

 

A portion of the 2014 samples were resampled by the QP and sent for validation to the SGS Lakefield laboratory (SGS Lakefield) in Lakefield, Canada.

 

All laboratories, including ALS Chemex, ALS Vespasiano, SGS Lakefield and SGS Geosol are ISO/IEC 17025 accredited. The SGS Geosol laboratory is ISO 14001 and 17025 accredited by the Standards Council. All laboratories used for the technical report are independent of Sigma and SMSA and provide services to Sigma pursuant to arm’s length service contracts.

 

11.5Sample Preparation and Analysis

 

All channel sample and drill core handling were done on site with logging and sampling conducted by employees and contractors of SMSA. Trench samples collected from 2012–2014 were crushed in Sigma’s on-site pilot plant, using a jaw crusher and then roll crushed to reduce the material to below 2 mm size. The heavy minerals were then concentrated on site using a pulse jig (refer to photograph of the pulse jig in Figure 5-3). The Universities of Rio de Janeiro and São Paulo, as well as SGS Lakefield, completed various metallurgical test work on these samples (refer to Section 13).

 

Channel and drill core samples collected during the 2013, 2014, 2017, 2018, 2020 and 2021 exploration programs from the Grota do Cirilo property were transported directly by Sigma representatives to SGS Geosol for sample preparation. The submitted samples were pulverized at SGS Geosol to respect the specifications of the analytical protocol and then analysed in the same laboratory. In 2013 and 2014, samples were pulverized at the same facilities, following the same specification as used in 2017.

 

All samples received at SGS Geosol were inventoried and weighted prior to being processed. Drying was done to samples having excess humidity. Sample material was crushed to 75% passing 3 mm using jaw crushers. One kilogram of material is put on separate bag and reserved for future analysis. Ground material was then split in two using a Jones split riffle to obtain one 2 kg sample reserved for duplicate analysis and one 1 kg samples for primary analysis. One-kilogram sub-samples were then pulverized using a ring and puck mill or a single component ring mill to 95% passing 150 mesh (106 µm) and split into four 250 g samples using a rotative splitter. The balance of the crushed sample (reject) was placed into the original plastic bag. The pulverized samples were finally analysed by SGS Geosol.

 

SGS Geosol has used two analytical methods for the pulverized samples from the Project. The analytical method used by SGS Geosol for the 2017 program is the 55-element analysis using sodium peroxide fusion followed by both inductively coupled plasma optical emission spectrometry (ICP-OES) and inductively coupled plasma mass spectrometry (ICP-MS) finish (SGS code ICM90A). This method uses 10 g of the pulp material and returns different detection limits for each element and includes a 10 ppm lower limit detection for Li and a 10,000-ppm upper limit detection for Li. For the 2018-2022 program, SGS Geosol used a 31-element analytical package using sodium peroxide fusion followed by both Inductively Coupled Plasma Atomic Emission Spectrometry (ICP-AES) and ICP-MS finish (SGS code ICP90A). Analytical results were sent electronically to Sigma and results were compiled in an MS Excel spreadsheet by the project geologists.

 

21501-REP-PM-001
Page | 104

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

All samples received at ALS Vespasiano were inventoried, weighed and dried prior to being processed. Sample material was crushed to 70% passing 2 mm using jaw crushers. Crushed material was split to 250 g sub-samples and then pulverized using a ring and puck mill or a single component ring mill to 85% passing 200 mesh (75 µm). The pulverized samples were sent to ALS Chemex using SGS-secured delivery services. Lithium and boron were determined by sodium peroxide fusion followed by ICP-AES analysis (ALS Chemex method ME-ICP82b). The method is a high-precision analytical method for Li to support resource determination in known deposits.

 

The 2017 witness samples collected on the 2014 drill core were analysed at SGS Lakefield using sodium peroxide fusion followed by both ICP-OES and ICP-MS finish (SGS code ICM90A).

 

11.6Quality Assurance and Quality Control

 

In addition to the laboratory quality assurance quality control (QA/QC) routinely implemented by SGS Geosol and ALS Chemex using pulp duplicate analysis, Sigma developed an internal QA/QC protocol for the Grota do Cirilo drilling, which consisted of the insertion of analytical standard reference materials (standards), blanks and core duplicates on a systematic basis with the samples shipped to the analytical laboratories. No pulp reanalysis was performed by Sigma in 2013 and 2014.

 

11.6.12014 Sampling Program

 

11.6.1.1Analytical Standards

 

Sigma inserted standards in sample batches during the 2013-2014 sampling program. During the 2014 campaign, the standard used was made of locally sourced and prepared pegmatite and was not certified. Sigma inserted an uncertified standard into the sample stream for every 25 samples for a total of five uncertified standards inserted.

 

11.6.1.2Analytical Blanks

 

During the 2013-2014 campaign Sigma included insertion of analytical blanks in the sample series as part of their internal QA/QC protocol. The blanks were sourced from a local silicate stone.

 

11.6.22017-2018 Sampling Campaign

 

11.6.2.1Analytical Standards

 

The 2017–2018 campaign used seven certified standards from African Mineral Standards (AMIS), an international supplier of certified reference materials (Table 11-5). The recommended lithium values for the AMIS standards range between 0.16 and 2.27% Li2O. A total of 88 standards were inserted during the 2017 campaign and 345 were inserted during the 2018 campaign. Figure 11-1 to Figure 11-6 show the standard results for AMIS standards submitted as part of the 2017–2018 campaigns.

 

Table 11-2 – Standard Average Li Values with Analytical Error

 

Analytical Standards Li (ppm) Analytical Error (2σ)
AMIS0341 4,733 799
AMIS0338 1,682 428
AMIS0339 22,700 2,506
AMIS0340 14,060 1462
AMIS0342 1,612 198
AMIS0343 7,150 1525
AMIS0408 15,300 2,360

 

21501-REP-PM-001
Page | 105

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 11-1 – Standard Sample Analysis Results for the 2017–2018 Batch with Standard AMIS0338

 

 

Figure 11-2 – Standard Sample Analyses Results for the 2017–2018 Batch with Standard AMIS0339

 

21501-REP-PM-001
Page | 106

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 11-3 – Standard Sample Analyses Results for the 2017–2018 Batch with Standard AMIS0341

 

 

Figure 11-4 – Standard Sample Analyses Results for the 2017–2018 Batch with Standard AMIS0342

 

21501-REP-PM-001
Page | 107

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 11-5 – Standard Sample Analyses Results for the 2017–2018 Batch with Standard AMIS0343

 

 

Figure 11-6 – Standard Sample Analyses Results for the 2017–2018 Batch with Standard AMIS0408

 

The results for the 2017–2018 batch are mostly within twice the standard deviation of the expected results. Only one result out of the 433 standards fell outside the acceptable limits recommended by AMIS.

 

21501-REP-PM-001
Page | 108

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

11.6.2.2Analytical Blanks

 

During the 2017–2018 campaign Sigma included the insertion of analytical blanks in the sample series as part of their internal QA/QC protocol. The blank samples, which are made of fine silica powder provided by AMIS, were inserted an average of one for every 20 samples by the Sigma geologist and subsequently sent to SGS Geosol.

 

A total of 647 analytical blanks were analysed during the 2017–2018 exploration programs. From the 647 blanks analysed, the first 39 yielded results between 50 and 94 ppm. In the last 554 samples only one sample returned with a value over three times the laboratory detection limit of 10 ppm. This discrepancy between the first 39 blanks and the rest is likely due to contamination of the initial blank batch of uncertified material. Because the level of contamination is very low, it is the QP’s opinion that these slightly higher values are inconsequential. Figure 11-7 shows blank sample results from the 2017–2018 exploration program.

 

 

Figure 11-7 – Blank Sample Analyses from the 2017–2018 Campaign

 

11.6.2.3Core Duplicates

 

Sigma inserted core duplicates as every 20th sample in the sample series as part of their internal QA/QC protocol. The sample duplicates correspond to a quarter HQ core from the sample left behind for reference, or a representative channel sample from the secondary channel cut parallel to the main channel. A total of 333 duplicate pairs were analyzed and only one sample fell outside the 20% difference line. Figure 11-8 is a scatterplot comparing original and duplicate core pairs. The average value for the original values is 4,431.5 ppm Li and the average value for the duplicate values is 4,433.2 ppm Li. The difference between original and duplicate averages is 1.63 ppm. The correlation coefficient R2 of 0.9912 suggests a high similarity between the two sets of analyses.

 

Pulp duplicates analyses were also conducted on 387 sample intervals. The average Li concentration for the original values is 4,547.6 ppm Li and the average value of the duplicates is 4,551.9 ppm Li. The difference between the averages is 4.3 and standard two-tailed paired t-test analysis returned no statistically significant bias. The correlation coefficient R2 of 0.9896 suggests a high similarity between the two sets of analyses (Figure 11-9).

 

21501-REP-PM-001
Page | 109

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 11-8 – Scatterplot of Core Duplicates

 

 

Figure 11-9 – Correlation Between Original Samples and Pulp Duplicates

 

11.6.2.4Check Assays

 

As additional QAQC, Sigma sent 664 samples from the 2017-2018 Grota do Cirilo drilling campaign to ALS Chemex for check sample analysis using the ALS Chemex protocol ME-ICP82b with sodium peroxide fusion.

 

21501-REP-PM-001
Page | 110

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Preparation was done by ALS Vespasiano and the samples were subsequently shipped to Vancouver for analysis.

 

The average lithium concentration for the original samples was 6,411.4 ppm Li and the duplicates averaged 6,475.9 ppm Li. The average difference was 64.5 (1.0%) and standard two-tailed paired t-test analysis returned a p-value of 0.0006 (α = 0.05) (Table 11-6 and Table 11-7). This indicates a slight bias with the ALS Chemex duplicates which is well within the accepted margin of error. Since the correlation coefficient R2 of 0.9792 suggest a high similarity between the two sets of analyses (Figure 11-10 and Figure 11-11), this bias does not warrant any corrective action. Five outliers were identified, but they were not linked to any statistical drift, and thus, it is inconsequential. The control sample results are therefore deemed acceptable, and the original data can be used in Mineral Resource estimation.

 

Table 11-3: Check Assay Original vs Control Samples

 

Element Count Original > Control Original ≤ Control
Count % Count %
Li2O (%) 664 375 56 287 44

 

Table 11-4: Check Assay Original and Control Descriptive Statistics

 

Data Set Mean Minimum Maximum Standard
Deviation
SGS_Geosol 6,411.40 50 43,175 5,948.2
ALS 6,475.9 40 44,956 5,989

 

 

Figure 11-10: Check Assay Correlation Between Original Samples and Pulp Duplicates

 

21501-REP-PM-001
Page | 111

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 11-11: Check Assay Distribution of the Difference Between Original Results and Pulp Duplicates

 

11.6.32021 Barreiro Sampling Campaign

 

For the 2021 drilling and sampling campaign, Sigma’s QAQC protocol utilized the inclusion of coarse duplicates, pulp duplicates, standards, blanks and check samples.

 

For every batch of 24 core samples from an individual hole, there was one coarse duplicate, one pulp duplicate, one standard, one blank and two check samples inserted.

 

For every batch of 50 core samples from an individual hole, there was one coarse duplicate, one pulp duplicate, two standards, two blanks and three check samples inserted.

 

11.6.3.1Analytical Standards

 

The 2021 campaign used four certified standards from African Mineral Standards (AMIS), an international supplier of certified reference materials (Table 11-8). The recommended lithium values for the AMIS standards used range between 0.16% and 1.50% Li. A total of 73 standards were inserted during the 2021 campaign. Figure 11-12 to Figure 11-15 show the standard results for AMIS standards submitted as part of the 2021 campaign.

 

Table 11-5: Standard Average Li Values with Analytical Error

 

Analytical Standard Li (ppm) Analytical Error (2σ)
AMIS0341 5,041 222
AMIS0342 1,603 199
AMIS0343 7,150 1,525
AMIS0408 16,000 2,400

 

21501-REP-PM-001
Page | 112

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Note: All concentrations and standard deviations are reported for fusion dissolution of the samples, as this was the assay technique used for the Sigma core samples.

 

 

Figure 11-12: Standard Sample Analysis Results for the 2021 Batch with Standard AMIS0341

 

 

Figure 11-13: Standard Sample Analysis Results for the 2021 Batch with Standard AMIS0342

 

21501-REP-PM-001
Page | 113

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 11-14: Standard Sample Analysis Results for the 2021 Batch with Standard AMIS0343

 

 

Figure 11-15: Standard Sample Analysis Results for the 2021 Batch with Standard AMIS0408

 

21501-REP-PM-001
Page | 114

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

The results for AMIS0342, AMIS0343 and AMIS0408 all fall within two standard deviations of the mean, although the distribution of AMIS0408 tends to show a slight negative bias compared to the other two standards. This is probably due to a change at the lab in upper limits of detection for the assay techniques used by Sigma, where the upper limit of detection was lowered from 10% Li to 1.5% Li2O, resulting in the majority of the samples showing as “over limit” and being re-assayed using a four-acid acid digestion and AAS finish.

 

The results for AMIS0341 are consistently below the two standard deviations for fusion dissolution but are within the limits for a four-acid digestion dissolution.

 

Overall, the results of the standards analysis are within industry-acceptable standards.

 

11.6.3.2Analytical Blanks

 

A total of 74 analytical blanks were analysed during the 2021 exploration program. Of the 74 blanks, three were above the lower limit of detection of 10 ppm Li and only one was over two standard deviations. Figure 11-16 shows blank sample results from the 2021 exploration program.

 

 

Figure 11-16: Blank Sample Analyses from the 2021 Campaign

 

11.6.3.3Coarse Duplicates

 

The coarse duplicates consist of coarse samples collected immediately after the primary or secondary crushing of the sample, but prior to pulverization. They are designed to evaluate the precision of the physical preparation of the samples, focussing on the splitting of the material.

 

A total of 56 duplicate pairs were analyzed and only one sample fell outside the 20% difference line. Figure 11-17 is a scatterplot comparing original and duplicate core pairs. The average value for the original values is 6,420.9 ppm Li and the average value for the duplicate values is 6,278.3 ppm Li. The difference between original and duplicate averages is 142.6 ppm. The correlation coefficient R2 of 0.978 suggests a strong correlation and a high similarity between the two sets of samples.

 

21501-REP-PM-001
Page | 115

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

11.6.3.4Pulp Duplicates

 

The pulp duplicates are duplicate samples collected immediately after the sample is pulverized. The purpose of the pulp duplicate is to evaluate the level of homogenization in the sample preparation.

 

A total of 56 pulp duplicates were submitted for analysis for the 2021 program. Figure 11-18 is a scatterplot comparing original and duplicate core pairs. The average Li concentration for the original values is 6,420.9 ppm Li and the average value of the duplicates is 6,422.1 ppm Li. The difference between the averages is 1.2 ppm and standard two-tailed paired t-test analysis returned no statistically significant bias. The correlation coefficient R2 of 0.9961 suggests a strong correlation and a high similarity between the two sets of samples.

 

 

Figure 11-17: Correlation Between 2021 Original Samples and Coarse Duplicates

 

21501-REP-PM-001
Page | 116

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 11-18: Correlation Between 2021 Original Samples and Pulp Duplicates

 

11.6.3.5Check Assays

 

As additional QAQC, Sigma sent 65 samples from the 2021 Barreiro drilling campaign to ALS Chemex for check sample analysis using the ALS Chemex protocol ME-ICP82b with sodium peroxide fusion.

 

The average lithium concentration for the original samples was 6,518.0 ppm Li and the duplicates averaged 6,559.7 ppm Li, with an average difference of 41.7 ppm or 0.6%. The correlation coefficient R2 of 0.9854 suggests a strong correlation and a high similarity between the two sets of samples. Consequently, the control sample results are deemed acceptable, and the original data can be used in Mineral Resource estimation.

 

Figure 11-19 shows the correlation between the original SGS assays, and the ALS check assays, while Figure 11-20 shows the frequency distribution between the original and duplicate assays.

 

21501-REP-PM-001
Page | 117

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 11-19: 2021 Check Assay Correlation Between SGS Originals and ALS Duplicates

 

 

Figure 11-20: Check Assay Distribution of the Difference Between SGS Originals and ALS Duplicates

 

21501-REP-PM-001
Page | 118

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

11.6.42021-2022 NDC Sampling Campaign

 

For the 2021-2022 NDC drilling and sampling campaign, Sigma’s QAQC protocol utilized the inclusion of coarse duplicates, pulp duplicates, standards, blanks and check samples.

 

For every batch of 24 core samples from an individual hole, there was one coarse duplicate, one pulp duplicate, one standard, one blank and two check samples inserted.

 

For every batch of 50 core samples from an individual hole, there was one coarse duplicate, one pulp duplicate, two standards, two blanks and three check samples inserted.

 

11.6.4.1Analytical Standards

 

The 2021-2022 NDC campaign used four certified standards from African Mineral Standards (AMIS), an international supplier of certified reference materials (Table 11-6). The recommended lithium values for the AMIS standards used range between 0.16% and 1.60% Li. A total of 191 standards were inserted during the 2021-2022 NDC campaign. Figure 11-21 to Figure 11-24 show the standard results for AMIS standards submitted as part of the 2021-2022 NDC campaign.

 

Table 11-6: Standard Average Li Values with Analytical Error

 

Analytical Standard Li (ppm) Analytical Error (2σ)
AMIS0341 5,041 222
AMIS0342 1,603 199
AMIS0343 7,150 1,525
AMIS0408 16,000 2,400

 

 

21501-REP-PM-001
Page | 119

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 11-21: Standard Sample Analysis Results for the 2021-2022 NDC Batch with Standard AMIS0341

 

 

Figure 11-22: Standard Sample Analysis Results for the 2021-2022 NDC Batch with Standard AMIS0342

 

21501-REP-PM-001
Page | 120

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 11-23: Standard Sample Analysis Results for the 2021-2022 NDC Batch with Standard AMIS0343

 

 

Figure 11-24: Standard Sample Analysis Results for the 2021-2022 NDC Batch with Standard AMIS0343

 

21501-REP-PM-001
Page | 121

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

11.6.4.2Analytical Blanks

 

A total of 198 analytical blanks were analysed during the 2021-2022 NDC exploration program. Of the 198 blanks, 29 were above the lower limit of detection of 0.002% Li2O and 19 were over two times the detection limit. Figure 11-25 shows blank sample results from the 2021-2022 exploration program.

 

 

Figure 11-25: Blank Sample Analyses from the 2021-2022 NDC Campaign

 

11.6.4.3Coarse Duplicates

 

A total of 198 duplicate pairs were analyzed and no samples fell outside the 20% difference line. Figure 11-26 is a scatterplot comparing original and duplicate core pairs. The average value for the original values is 1.48% Li2O and the average value for the duplicate values is 1.46% Li2O. The difference between original and duplicate averages is 0.02% Li2O. The correlation coefficient R2 of 0.99 suggests a strong correlation and a high similarity between the two sets of samples.

 

11.6.4.4Pulp Duplicates

 

A total of 198 pulp duplicates were submitted for analysis for the 2021-2022 NDC program. Figure 11-27 is a scatterplot comparing original and duplicate core pairs. The average value for the original values is 1.47% Li2O and the average value for the duplicate values is 1.46% Li2O. The difference between original and duplicate averages is 0.01% Li2O. The correlation coefficient R2 of 0.977 suggests a strong correlation and a high similarity between the two sets of samples.

 

21501-REP-PM-001
Page | 122

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 11-26: Correlation Between 2021-2022 NDC Original Samples and Coarse Duplicates

 

 

Figure 11-27: Correlation Between 2021-2022 NDC Original Samples and Pulp Duplicates

 

11.6.4.5Check Assays

 

As additional QAQC, Sigma sent 205 samples from the 2021-2022 NDC drilling campaign to ALS Chemex for check sample analysis using the ALS Chemex protocol ME-ICP82b with sodium peroxide fusion.

 

The average lithium grade for the original samples was 1.46% Li2O and the duplicates averaged 1.47% Li2O. The correlation coefficient R2 of 0.976 suggests a strong correlation and a high similarity between the two sets of samples. Consequently, the control sample results are deemed acceptable, and the original data can be used in Mineral Resource estimation.

 

Figure 11-28 shows the correlation between the original SGS assays, and the ALS check assays.

 

21501-REP-PM-001
Page | 123

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 11-28: 2021-2022 NDC Check Assay Correlation Between SGS Originals and ALS Duplicates

 

11.7Sample Security

 

Core was not stored in a secured area; however, access to the area is limited to authorized employees. Samples are placed into bags and numbered with the sample tag inserted in the bag. Sample collection and transportation have always been undertaken by company personnel using company vehicles. Tracking of sample shipments used industry-standard procedures. Chain-of-custody procedures consisted of filling out sample submittal forms that were sent to the laboratory with sample shipments to make certain that all samples were received by the laboratory. Laboratories are inspected regularly by Sigma geologists.

 

11.8Sample Storage

 

The remaining drill core is stored at the Project site in metal racks in secure sheds.

 

11.9QP Comments

 

SGS validated the exploration processes and core sampling procedures used by SMSA in 2017, 2018 and 2021-2022 as part of an independent verification program.

 

The QP concluded that the drill core handling, logging and sampling protocols are at conventional industry standard and conform to generally acceptable best practices. The chain of custody was followed by SMSA employees, and the sample security procedure showed no flaws.

 

The QP considers that the sample quality is good and that the samples are generally representative.

 

Finally, the QP is confident that the system is appropriate for the collection of data suitable for a Mineral Resource estimate.

 

21501-REP-PM-001
Page | 124

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

The descriptions in this section are based on information supplied by Sigma and observations made during the independent verification programs conducted at the Project site by SGS during September 11–15, 2017, July 11–17, 2018, September 18-23, 2018, October 18-21, 2021 and May 30 to June 01, 2022.

 

The evaluation of the geological setting and mineralization on the Project is based on observations and sampling from surface (through geological mapping, grab and channel samples) and diamond drilling.

 

21501-REP-PM-001
Page | 125

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

12DATA VERIFICATION

 

A visit to the Project was conducted by Marc-Antoine Laporte, P.Geo., M.Sc. from September 11–15, 2017, again from July 11–17, 2018, from the 18-23 September 2018 and October 18-21, 2021. The visits enabled the QP to become familiar with the exploration methods used by SMSA, the field conditions, the position of the drill hole collars, the core storage and logging facilities and the different exploration targets. During the 2017 site visit, the QP collected a total of 26 control samples from witness core stored on site from the 2014 Xuxa deposit drill program.

 

The data validation was conducted from three fronts:

 

Validation of the drilling database;

Validation of the QA/QC data (see section 11.6);

Control sampling program.

 

12.1Drilling Database

 

The database for the Project was first transmitted to SGS by Sigma on September 15, 2017, and regularly updated by Sigma geologists. The database contains data for: collar locations; downhole surveys; lithologies and lithium assays.

 

Upon importation of the data into the modelling and mineral resources estimation software (Genesis©), SGS conducted a second phase of data validation. At this point all the major discrepancies were removed from the database.

 

Lastly, SGS conducted random checks on approximately 5% of the assay certificates, to validate the assay values entered in the database.

 

12.2Witness Sampling

 

During the 2017 site visit, the QP conducted a check sampling program, re-sampling a total of 26 core samples from the 2014 drill program to verify the presence of lithium mineralization on the Xuxa deposit. The samples were taken from previously sampled intervals and the half cores were cut to quarter cores. The samples were analysed at SGS Lakefield for lithium.

 

A total of nine mineralized intervals were sampled to compare the average grade for the two different laboratories (Table 12-1). The average for the original samples is 1.61 % Li2O while the average for the control samples is 1.59 % Li2O (Table 12-2). The average grade difference is 0.02% which makes a relative difference of 1.28% between the original and the control samples.

 

Table 12-3, and Figure 12-1 to Figure 12-3 present the results of the control sample statistical analysis. The correlation plot yields a correlation coefficient R2 of 0.6527 and standard two-tailed paired t-test analysis returned no statistically significant bias (p-value = 0.8473 / α = 0.05). This gives no reasons to doubt the validity of the SGS Geosol assays results.

 

21501-REP-PM-001
Page | 126

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 12-1 – Witness Sample Mineralized Interval Comparison between SGS Geosol and SGS Lakefield

 

Drill Hole Sample Number

From

(m)

To

(m)

Length

(m)

SGS Geosol

Li2O%

SGS Lakefield

Li2O%

Relative
Difference

(%)

DH-XU-01 AT-2005 23.50 25.00 0 2.0903 1.8834 0.0990
DH-XU-01 AT-2010 30.90 32.00 1.5 1.9138 2.1155 -0.1054
DH-XU-01 AT-2017 39.70 41.00 1.1 0.8754 1.3435 -0.5347
DH-XU-02 AT-2024 81.00 82.40 1.3 2.4264 2.3500 0.0315
DH-XU-02 AT-2030 88.90 90.20 1.4 1.6600 1.6236 0.0219
DH-XU-02 AT-2035 95.60 96.60 1.3 3.0110 2.6661 0.1146
DH-XU-04 AT-2041 86.70 87.70 1 1.9414 1.3021 0.3293
DH-XU-04 AT-2045 91.00 91.90 1 2.3614 2.6376 -0.1170
DH-XU-04 AT-2049 94.40 95.50 0.9 0.7796 1.4412 -0.8487
DH-XU-05 AT-2057 37.60 38.60 1.1 2.0744 1.3400 0.3540
DH-XU-05 AT-2061 42.20 43.40 1 1.1932 1.7088 -0.4322
DH-XU-05 AT-2066 48.80 50.00 1.2 1.8583 1.5099 0.1875
DH-XU-06 AT-2074 54.80 56.00 1.2 0.6470 0.5346 0.1737
DH-XU-06 AT-2082 64.40 65.60 1.2 2.3767 1.1783 0.5042
DH-XU-06 AT-2087 70.70 71.90 1.2 1.0337 1.2453 -0.2047
DH-XU-07 AT-2099 24.40 25.60 1.2 1.3756 1.4929 -0.0853
DH-XU-07 AT-2101 26.70 27.70 1.2 0.2917 0.3189 -0.0930
DH-XU-08 AT-2109 68.30 69.30 1 2.0692 3.2551 -0.5731
DH-XU-08 AT-2113 72.00 73.00 1 3.7001 2.5190 0.3192
DH-XU-08 AT-2120 78.90 79.70 1 2.2454 2.1119 0.0594
DH-XU-09 AT-2131 23.80 24.80 0.8 1.1430 1.1463 -0.0028
DH-XU-09 AT-2137 29.50 30.20 1 2.6732 3.0125 -0.1269
DH-XU-09 AT-2140 31.80 32.60 0.7 0.3346 0.7576 -1.2645
DH-XU-10 AT-2149 35.40 36.10 0.8 0.1102 0.6433 -4.8359
DH-XU-10 AT-2150 36.10 36.90 0.7 1.3525 0.9833 0.2730
DH-XU-10 AT-2152 37.90 38.90 0.8 0.3912 0.2717 0.3054

 

21501-REP-PM-001
Page | 127

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 12-2 – Witness Sample Original vs Control Differences

 
Element Count Original > Control Original ≤ Control
Count % Count %
Li2O (%) 26 13 50 13 50

 

Table 12-3 – Witness Sample Original and Control Descriptive Statistics

 

Data Set Mean Minimum Maximum Standard
Deviation
SGS_Geosol 1.613 0.110 3.700 0.910
SGS_Lakefield 1.592 0.272 3.255 0.807

 

 

Figure 12-1 – Witness Sample Original vs Control Sample Differences

 

21501-REP-PM-001
Page | 128

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 12-2 – Witness Sample Original vs Control Sample Differences Frequency Distribution

 

 

Figure 12-3 – Witness Sample Original vs Control Sample Differences Correlation Analysis

 

21501-REP-PM-001
Page | 129

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

12.3QP Comments

 

Sigma implemented an internal QA/QC protocol by regularly inserting reference materials (standards and blank) and core duplicates in the samples stream.

 

SGS completed a review of the sample preparation and analysis (including the QA/QC analytical protocol implemented by SMSA for the Grota do Cirilo property). The QP visited the Project in 2017, twice in 2018, once in 2021 and in 2022, to review the sample preparation procedures and local infrastructure.

 

Following the data verification process and QA/QC review, the QP is of the opinion that the sample preparation, analysis and QA/QC protocol used by Sigma for the Project follow generally accepted industry standards and that the Project data is of a sufficient quality.

 

21501-REP-PM-001
Page | 130

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

13MINERAL PROCESSING AND METALLURGICAL TESTING

 

Preliminary metallurgical test work for the Xuxa deposit was undertaken in November 2017 by SGS Canada Inc. in Lakefield, Ontario, Canada on a high-grade sample. Mineral processing testing for the Xuxa feasibility study commenced in October 2018.

 

Preliminary metallurgical test work for the Phase 2 Barreiro deposit was first carried out in November 2020 by SGS Canada Inc. in Lakefield, Ontario, Canada on 4 variability samples and a master composite.

 

13.1Xuxa Metallurgical Test work (2018-19)

 

13.1.1Stage 1 Testing

 

Figure 13-1 and Figure 13-2 give an overview of the Xuxa Stage 1 test work flowsheet and sample preparation, respectively. Stage 1 test work was conducted on variability samples, and included feed characterisation, grindability, ore sorting, heavy liquid separation, bulk test work including reflux, further dense media separation and environmental testing.

 

 

Figure 13-1 – Overview of Typical Stage 1 Test work Flowsheet

 

21501-REP-PM-001
Page | 131

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 13-2 – Sample Preparation Diagram for Stage 1 Variability Samples

 

Sample selection was undertaken by Primero, with Sigma reviewing the proposed material choices. The initial variability sample selection criteria were as follows:

 

1.High grade Li2O

2.Low grade Li2O

3.Later years – high grade

4.Early years – average grade

5.High Fe

6.High schist.

 

The six variability samples criteria aligned closely with the sample selection criteria outlined in the CIM Best Practice Guidelines (Sub-Committee on Best Practice Guidelines for Mineral Processing, 2011).

 

Selected drill core samples were sorted into:

 

Six ore sorting samples

Six variability samples (for Stage 1 test work)

One waste rock sample for environmental test work.

 

The remaining drill core samples were combined to create the composite sample for Stage 2 test work.

 

Fourteen samples from a separate shipment were combined to produce six samples of relatively equal weights (~40 kg) for the unconfined compressive strength (UCS) and Bond low-energy impact test work.

 

Twenty-five drums (5,196 kg) of trench samples were also delivered for pilot plant testing in Stage 3. The fine fraction from the trench samples was used for solid-liquid separation test work.

 

21501-REP-PM-001
Page | 132

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

13.1.1.1Characterization

 

Table 13-1 presents the head assays of each of the six variability (Var) samples.

 

Table 13-1 – Chemical Analysis and WRA Results

 

 

The lithium grade of the six variability samples were relatively close to expected grade. The average iron content was relatively low at ~0.50% Fe2O3 in Var 1 to 4. The iron content was higher in Var 5 and 6 as iron and schist were added to the samples. The average specific gravity was 2.72.

 

13.1.1.2Grindability Test Work

 

The following comminution tests were carried out on the variability samples:

 

Bond abrasion test: used to determine the abrasiveness of a test sample. The index is used by crusher and mill engineers to determine wear rates of liners. Results are provided in Table 13-2.

Bond ball mill grindability tests: semi-continuous (locked cycle) tests. The Bond ball mill work index is used to determine the power draw or energy consumption to ball mill a test sample. Results are provided in Table 13-2. The sample was characterized as medium hardness relative to the SGS database, with an average BWi of 13.8 kWh/t.

Uniaxial Compression Test (UCS) : used to determine the relative strength of material in a crushing environment. Results are provided in Table 13-3. Variability was observed in the average UCS of each the six samples, with values ranging from 50.1–74.4 MPa. The overall average UCS was 64.2 MPa.

Bond low-energy impact tests: a particle test in which rocks are subjected to increasingly higher energy levels until they fracture. Results are provided in Table 13-3. Variability was observed in the average crusher work indices (CWi) of each the 6 samples, with values ranging from 9.8 kWh/t to 14.6 kWh/t. The sample characterizations ranged from medium to hard, with an overall average CWi of 11.8 kWh/t.

 

Table 13-2 – Bond Abrasion and Ball Mill Work Index Test Work Summary

 

Sample Abrasion Index Bond Ball Mill
Work Index
(kWh/t)
Var 1 0.440 14.4
Var 2 0.350 14.1
Var 3 0.458 14.9
Var 4 0.381 13.6
Var 5 0.379 12.2
Var 6 0.380 13.6
Average 0.398 13.8
Min 0.350  
Max 0.458  

 

21501-REP-PM-001
Page | 133

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Sample Abrasion Index Bond Ball Mill
Work Index
(kWh/t)
Var 4 0.381 13.6
Var 5 0.379 12.2
Var 6 0.380 13.6
Average 0.398 13.8
Min 0.350  
Max 0.458  

 

Table 13-3 – Average UCS and CWi

 

Sample Average UCS
(MPa)
Average CWi
(kWh/t)
Var 1 65.2 10.3
Var 2 57.8 10.8
Var 3 50.1 9.8
Var 4 74.4 14.6
Var 5 69.3 12.9
Var 6 68.6 12.6
Average 64.2 11.8

 

13.1.1.3Ore Sorting Test Work

 

Ore sorting test work on the six samples was carried out by Steinert US at their facility in Kentucky, USA. The objective of this preliminary test work was to evaluate the viability of ore-sorting as a technique for waste rejection from the Xuxa ore, and to investigate the performance of different sensors.

 

Five samples were pegmatite samples consisting of little or no waste rock, while the sixth sample consisted of waste rock only. The ore sorter machine used for the test work was a Steinert KSS 100 520 FLI XT with four types of sensors: XRT (with 3-D laser), induction, laser (brightness), and colour. The products from the test work were returned to SGS Lakefield for Li and whole rock analysis (WRA).

 

The ore sorter calibration indicated that all four sensors could be applied to remove waste from the samples. Therefore, different sensors (and combinations of sensors) were tested on the five samples. A summary of the ore sorter test work results is presented in Table 13-4.

 

Table 13-4 – Summary of Ore Sorter Test work Results

 

Sample Product Sensor Weight Assays (%) Distribution (%)
% Li2O Fe2O3 Li2O Fe2O3
1 Product XRT 92.4 1.43 0.63 88.0 70.6
Waste + Fines 7.6 2.36 3.17 12.0 29.4
Feed Head (Calc.) 100 1.50 0.82 100 100
2 Product Laser 95.5 1.50 0.60 98.9 68.0
Waste + Fines 4.5 0.34 5.94 1.1 32.0
Feed Head (Calc.) 100 1.45 0.84 100 100
3 Product XRT / laser / induction 93.9 1.62 0.66 98.9 57.0
Waste + Fines 6.1 0.27 7.61 1.1 43.0
Feed Head (Calc.) 100 1.53 1.09 100 100
4
(1 pass)
Product Induction 94.4 1.51 0.67 96.8 74.1
Waste + Fines 5.6 0.84 3.95 3.2 25.9
Feed Head (Calc.) 100 1.47 0.85 100 100
4
(2 pass)
Product Induction 97.5 1.50 0.70 99.2 80.2
Waste + Fines 2.5 0.45 6.79 0.8 19.8
Feed Head (Calc.) 100 1.47 0.85 100 100
5 Product XRT / laser / induction 96.2 1.39 0.70 99.2 74.2
Waste + Fines 3.8 0.28 6.26 0.8 25.8
Feed Head (Calc.) 100 1.35 0.91 100 100

 

21501-REP-PM-001
Page | 134

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

The relatively low mass and lithium distributions to the waste and fines resulted in only marginal lithium upgrading. However, due to the high iron distributions to the waste and fines, significant iron rejection was typically observed. The greatest change was in the test on sample 3 (from 1.09% Fe2O3 in the feed to 0.66% Fe2O3 in the product), using combination of XRT / laser / induction sensors.

 

13.1.2Heavy Liquid Separation

 

Heavy liquid separation tests were conducted to assess the amenability of the sample to dense media separation (DMS) for spodumene beneficiation, and to determine the optimum crush size for DMS.

 

Four size fractions were evaluated: 6.3 mm, 9.5 mm, 12.5 mm, and 15.9 mm. A summary of the key data from the HLS test results is presented in Table 13-5.

 

The Stage 1 HLS tests delivered promising results, with >6% Li2O concentrate generated in each of the 24 tests. Lithium recoveries in the interpolated 6.0% Li2O concentrate typically ranged from 40% to 70%, with the significant variation observed between variability samples and at different crush sizes.

 

Table 13-5 – Summary of HLS Test Results on Variability Samples

 

  Mass Distribution (%) Media SG Li2O Grade (%) HLS Li Distribution (%)
  6% Li2O Conc
(interpolated)
Required for 6% Li2O
Conc (interpolated)
Head (Calc.) 6% Li2O Conc
(interpolated)
SG 2.50 Floats
 
Crush Size (mm) 15.9 12.5 9.5 6.3 15.9 12.5 9.5 6.3 15.9 12.5 9.5 6.3 15.9 12.5 9.5 6.3 15.9 12.5 9.5 6.3
Var 1 15.1 18.1 19.3 20.5 2.88 2.87 2.86 2.80 1.66 1.77 1.72 1.71 54.0 60.5 66.6 71.9 5.6 7.7 5.0 5.3
Var 2 6.8 8.7 5.5 8.2 2.88 2.86 2.98 2.83 1.01 1.03 0.92 1.02 39.9 49.0 35.4 48.2 15.4 15.2 15.0 17.0
Var 3 12.9 14.7 14.5 16.1 2.87 2.85 2.88 2.80 1.53 1.59 1.54 1.60 49.9 54.9 56.2 60.2 11.1 11.3 10.4 12.1
Var 4 12.1 11.6 15.9 17.9 2.90 2.91 2.90 2.80 1.51 1.45 1.55 1.50 48.1 48.0 61.4 71.5 5.4 5.2 4.6 4.8
Var 5 6.1 9.3 12.2 11.1 2.99 2.93 2.92 2.92 1.10 1.28 1.28 1.16 33.1 43.7 56.9 57.1 4.6 5.3 4.3 5.7
Var 6 6.0 8.0 7.5 9.7 2.96 2.92 2.95 2.88 1.13 1.06 1.03 1.07 31.6 45.6 44.0 53.2 13.4 13.8 14.4 14.8

 

Though the recovery of lithium in 6.0% Li2O spodumene concentrate was maximized at a crush size of 6.3 mm, 9.5 mm was selected as the optimum crush size to minimize fines generation.

 

21501-REP-PM-001
Page | 135

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

13.1.3Bulk Test Work

 

The Stage 1 bulk beneficiation test work program was designed to simulate, as closely as possible, the expected plant flowsheet at laboratory scale. The beneficiation test work consisted primarily of REFLUX Classifier, DMS, and dry magnetic separation test work. Each of the coarse, fines and ultrafines fractions of a variability sample were separately processed to generate spodumene concentrate.

 

13.1.3.1REFLUX™ Classifier Test Work Results

 

In the absence of mineralogical data on each of the products, potassium (K2O) was considered to be an indicator for the main mica minerals (muscovite and biotite) expected to be present in the samples. The results of the test work appeared to be promising with K2O upgrading and Li2O downgrading observed in the overflow products generated from each of the RC feed samples. This indicates that mica was preferentially rejected to the overflow product.

 

On average, 8.8% of the K2O and 2.3% of the lithium reported to the fines overflow while 5.3% of the K2O and 1.4% of the lithium reported to the ultrafines overflow.

 

13.1.3.2Coarse Dense Media Separation Test Work

 

An SG of 2.65 was selected as the cut-point for the bulk DMS first pass tests to maximize silicate gangue rejection to the DMS tailings, while minimizing lithium losses. DMS second-pass SG cut-points were recalculated to target a concentrate grade of 6.20% Li2O. These revised DMS second-pass cut-points for Var 1 –Var 4 are presented in Table 13-6.

 

Table 13-6 – Coarse Fraction DMS results

 

Sample

Target Coarse
DMS second pass

SG Cut-Point

Lithium recovery to
second pass sinks

(%)

Lithium grade in
second pass sinks

(%)

Lithium recovery
to non-mags

(%)

Lithium grade
in non-mags

(%)

Var 1 2.88 65.7 6.11    
Var 2 2.90 43.4 6.26    
Var 3 2.90 52.2 6.52    
Var 4 2.92 52.2 5.88    
Var 5 2.85 60.9 4.54 57.6 5.64
Var 6 2.90 46.6 5.53 46.0 6.01

 

The lithium grades in the DMS tailings were relatively high, averaging 0.48% Li2O across the six variability samples (Table 13-7). This was largely due to presence of significant amounts of petalite in the variability samples.

 

Table 13-7: DMS Tailings Grades

 

Sample DMS
Tailings
grade, %
Li2O
Var 1 0.47
Var 2 0.46
Var 3 0.65
Var 4 0.40
Var 5 0.52
Var 6 0.63

 

21501-REP-PM-001
Page | 136

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Sample DMS
Tailings
grade, %
Li2O
Var 5 0.52
Var 6 0.63

 

 

13.1.3.3Coarse DMS Recrushing, Screening, and HLS Test work

 

The DMS middlings of each variability sample were stage-crushed to -3.3 mm and screened at 0.5 mm to produce -3.3 mm / +0.5 mm HLS feed samples. Due to lack of sample size HLS was used instead of DMS. These samples were submitted for two pass HLS tests, with passes at the same media SGs as those used in the coarse DMS tests on each variability sample. As on-spec concentrate was not generated from the coarse DMS of Var 4 and Var 5, an additional HLS pass was added at a slightly higher SG for these two samples.

 

Spodumene concentrate grading >6% Li2O was generated from the HLS tests on the coarse re-crushed middlings of each of the variability samples apart from Var 6 (which graded 5.64% Li2O). For Var 5, the SG 2.90 HLS sinks product graded >6% Li2O, an increase over the SG cut-point of 2.85 used in the Var 5 coarse DMS test. Averaged over the six variability samples, the additional lithium recovery to the -3.3 mm middlings HLS concentrate was 13.6%.

 

Figure 13-3 illustrates the effect of combining the -3.3 mm middlings HLS concentrate with the coarse DMS concentrate on the overall combined concentrate Li2O grade for each variability sample. In general, due to the lower mass yield to the HLS concentrates compared to the corresponding DMS concentrates, the combined DMS and HLS concentrate Li2O grades are very similar to those of the coarse DMS concentrates.

 

 

Figure 13-3 – Effect of Combining Coarse DMS and -3.3 mm Middlings HLS Concentrates

 

13.1.3.4Fines Fraction DMS Test Work

 

DMS first pass SG cut-point (SG 2.65) was used for the fines fractions of each variability sample.

 

The DMS second pass cut-points selected for the fines fraction DMS test work are presented in Table 13-8.

 

21501-REP-PM-001
Page | 137

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 13-8 – Fines Fraction DMS 2nd Pass SG Cut-Points

 

Sample

Target Coarse DMS
second pass

SG Cut-Point

Lithium recovery to
second pass sinks
(%)
Lithium grade in
second pass sinks
(%)

Lithium recovery to
non-mags

(%)

Lithium grade in
non-mags

(%)

Var 1 2.86 72.8 5.94    
Var 2 2.88 53.5 6.09    
Var 3 2.88 65.6 6.01    
Var 4 2.90 75.1 5.98    
Var 5 2.88 72.4 4.08 69.3 6.01
Var 6 2.88 62.8 4.87 60.4 6.11

 

13.1.3.5Ultrafines Fraction DMS Test Work

 

SG cut-points used for the coarse fraction DMS second pass were also used for the single-pass ultrafines DMS test work on the corresponding variability samples. Results are presented in Table 13-8.

 

Table 13-9 – Ultra-fine Fraction DMS Results

 

Sample

Target Ultrafines
DMS first pass

SG Cut-Point

Lithium recovery
to first pass sinks

(%)

Lithium grade
in first pass
sinks

(%)

Lithium recovery
to non-mags

(%)

Lithium grade
in non-mags

(%)

Var 1 2.88 69.4 6.74 67.3 6.52
Var 2 2.90 42.1 5.81 39.0 5.98
Var 3 2.90 51.7 6.65 48.4 6.48
Var 4 2.92 60.3 6.80 58.2 6.65
Var 5 2.90 59.1 6.24 52.8 6.61
Var 6 2.90 53.5 6.18 50.0 6.07

 

13.1.4Overall Flowsheet Test Work

 

The trend in lithium grades in the different size fractions was identical for all six variability samples. Lithium was upgraded in the coarse fraction, with the lithium grade declining in each finer size fraction. The lithium grade in the fines fraction was observed to be close to variability sample head grade, and lithium downgrading was observed in the ultrafines and fines fractions.

 

As a result of the mass distributions and the lithium head grades of each fraction, the greatest proportion of lithium reported to the coarse fraction, followed closely by the fines fraction, and then the ultrafines and hypofines fractions.

 

On-spec or near-spec combined spodumene concentrate was successfully generated from the bulk processing of each of the variability samples. Apart from Var 3 and Var 5, the combined concentrate from each variability sample graded between 6.00% and 6.16% Li2O, indicating that lithium recovery to the concentrate was optimized based on the flowsheet tested.

 

The iron contents of the Var 1–Var 4 combined spodumene concentrates were each below the 1% Fe2O3 target. Only in Var 4 was this target achieved without any dry magnetic separation of the DMS concentrates. For Var 1 and Var 3, dry magnetic separation was required for the ultrafines DMS concentrate, while dry magnetic separation of the fines and ultrafines DMS concentrates was required for Var 2.

 

21501-REP-PM-001
Page | 138

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Dry magnetic separation of the coarse, fines, and ultrafines DMS concentrates was required for the two high-waste variability samples (Var 5 and Var 6). The combined concentrates generated grades slightly in excess of 1% Fe2O3, at 1.10% Fe2O3 for Var 5 and 1.06% Fe2O3 for Var 6. It is expected that the required slight decrease in iron content of these samples may be achieved by the further optimization of the parameters used in the dry magnetic separation test work.

 

The combined middlings grades were relatively high for Var 1–Var 4, ranging from 0.91% Li2O to 1.23% Li2O. The combined middlings grades for Var 5 and Var 6 were ~0.55% Li2O. The average lithium distribution to the combined middlings, across the six variability samples, was 5.7%.

 

The mass yields and lithium losses to the mica overflow (combined REFLUX™ classifier overflow) and magnetic concentrate products were relatively low for each variability sample. The mass yield to the mica overflow averaged 1.6%, with an average lithium distribution of 0.8%. The median mass to the combined magnetic concentrate was 0.5%, with a median lithium distribution of 1.1%. The main outlier was the Var 5 (high Fe) magnetic concentrate, which accounted for 4.1% of the feed mass and 3% of the feed lithium.

 

The mass yield to the hypofines fractions ranged from 14.0% for Var 1 to 23.3% for Var 5, with an average of 17.3%. Lithium distribution to the hypofines fraction ranged from 11.4% for Var 1 to 16.0% for Var 5, with an average of 13.9%. The lithium grades of the hypofines fractions were slightly lower than the head grades of the corresponding variability sample.

 

13.1.5Geochemical (Environmental) Testing

 

In addition to the geochemical test work conducted at SGS Geosol on 20 samples as detailed in Section 20.1.4, the metallurgical test work program at SGS Lakefield included geochemical testing on a sample which was a blend of waste rock and DMS tailings, in a ratio of 10:1. Environmental tests were conducted on three samples: waste rock; DMS tailing identified as “ENV Test Tailings”; and a waste rock/DMS tailing composite identified as “Untested/DMS Tls Blend”. The purpose of the environmental program was to assess the acid rock drainage (ARD), contaminant release, and geotechnical characteristics associated with the samples tested.

 

Geochemical test results for the DMS tailing and humidity cell testing of the waste rock/tailing composite are available.

 

Semi-quantitative XRD analyses determined that the waste rock was predominantly composed of silicates with minor to trace amounts of iron-sulphide and iron-oxide minerals. Moderate to minor contributions of aluminium, iron, calcium, magnesium, potassium, and sodium were also identified by elemental analysis.

 

Ontario Schedule 4 limits were used in analysing the results of the waste rock toxicity characteristic leaching procedure (TCLP) leachate. All of the typically controlled parameters were well within the limits specified for this test procedure. Since the TCLP is a highly aggressive extraction procedure, the limits applicable to this test procedure are much higher than those used for synthetic precipitation leaching procedure (SPLP) or shake flask extraction (SFE) leachates. Results of the waste rock SPLP and SFE leachate analyses reported all parameters at concentrations well within the World Bank guidelines.

 

For the sample tested at SGS Lakefield, modified acid–base accounting (ABA) of the waste rock and the waste rock/tailings composite suggested that these samples are unlikely to generate acidity due to sulphide oxidation. However, as stated in Section 20.1.4, the results of the ABA tests on the other waste rock samples are reported as either non-acid-generating or in the uncertain range.

 

Analysis of the waste rock/tailings composite humidity cell leachates reported all World Bank (WB) controlled parameters well within the specified guidelines. Testing was stopped after 20 weeks of leaching. The depletion rates calculated for this test cell indicated that, if the current depletion rates continue, the waste rock/tailings composite may be expected to retain fast reacting carbonate neutralization potential available upon exhaustion of the samples sulphide content. The test results for that sample indicated no expected acid generation.

 

21501-REP-PM-001
Page | 139

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Results of the particle size distribution analysis indicated that the DMS tailing sample was comprised entirely of coarse-grained particles (gravel and sand size). While the waste rock was also comprised predominantly of coarse particle sizes, this sample also reported a significant silt size fraction.

 

13.1.6Stage 2 (Composite Sample)

 

The remaining drill core sample after variability sample tests was grouped to form a “composite sample”. This sample contained a significant proportion of material classified as “later year” samples. The composite sample was subjected to feed characterisation, abrasion and beneficiation test work.

 

The fines and ultrafines fractions were passed through the Reflux classifier prior to DMS. Dry magnetic separation was undertaken on the fines and ultrafines DMS concentrates. The combined spodumene concentrate graded 6.16% Li2O and 0.85% Fe2O3 with 46.2% lithium recovery. The combined results do not consider the processing of re-crushed DMS middlings.

 

13.1.7Stage 3 (Pilot Plant Sample)

 

The samples for Stage 3 pilot plant, with calculated head grade of 1.64% Li2O, were trench samples from the north pit. These samples had an average head grade of 1.42% Li2O. The samples were subjected to feed characterisation, beneficiation, solid-liquid separation, optical sorting and iron removal test work.

 

The DMS test results indicate the production of a concentrate (at SG 2.80) grading 6.32% Li2O and 0.71% Fe2O3 with 71.9% lithium recovery in 19.9% of the feed mass.

 

The bulk pilot plant samples results indicated that a concentrates grade of 6.41% Li2O with 73.1% lithium recovery, iron content was 0.69% Fe2O3 could be achieved without the need for any dry magnetic separation.

 

The combined tailings grade was relatively low at 0.25% Li2O, and 7.5% of the total lithium reported to this product. Some of this lithium may be in the form of petalite.

 

13.2Xuxa Metallurgical Test Work (2020-2021)

 

13.2.1Sample Selection and Test Work Objectives

 

During the 2018 sample selection for the metallurgical test work, samples of pegmatite from outside the Xuxa resource model were incorporated in variability samples Var 2, Var 3, and Var 6. This created a bias by adding a higher concentration of petalite into the samples compared to the average abundance in the main Xuxa pegmatite (Figure 13-4). In order to be more representative of the deposit, a new sample selection based on mineralogy, average Li2O grade and spatial distribution was completed by SGS in 2021, followed by a new metallurgical drilling program to select representative samples. Sigma completed nine (9) metallurgical drill holes, recovering 500 kg of material for the new test work. SGS Lakefield used the same parameters as they had for the 2018 metallurgical test work.

 

21501-REP-PM-001
Page | 140

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

 

Figure 13-4: Xuxa Main Pegmatite and Second Pegmatite Sampled in 2018

 

Along with the sample selection, a statistical analysis of the petalite and spodumene distribution was completed throughout the deposit. Results were used to control the sample selection variable tolerance level of the main lithium barring minerals. The analysis was based on detailed mineralogical logging by Sigma’s mineralogist along with XRD analysis from the metallurgical samples.

 

Results show an average petalite distribution of 1.6% throughout the deposit (with 4.5% standard deviation) and 15.8% distribution for spodumene (with 7.8% standard deviation). SGS applied the same interpolation parameters used for the resource estimation and the block model distribution for petalite is shown in Figure 13-5 and spodumene in Figure 13-6. The overall exercise confirmed the geological observation and interpretation and is consistent with the test results.

 

21501-REP-PM-001
Page | 141

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

 

Figure 13-5: Petalite Distribution (%) in Xuxa Block Model (Plan View Looking North)

 

 

 

Figure 13-6: Spodumene Distribution (%) in Xuxa Block Model (Plan View Looking North)

 

21501-REP-PM-001
Page | 142

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

13.2.2Sample Preparation and Characterization

 

Chemical analyses of the three variability samples are shown in Table 13-10 (calculated head grades based on pegmatite and schist components). The head grades of the variability samples ranged from 1.27% Li2O for Variability sample 6 (Var 6) to 1.74% Li2O in the Var 3 sample. Var 2 and Var 3 contained 3% dilution (schist) while Var 6 contained 10% dilution. Var 6 had elevated concentrations of iron (0.94% Fe2O3) and potassium (3.40% K2O) relative to Var 2 and Var 3.

 

Table 13-10: Variability sample assays

 

ELEMENT
/ OXIDE
SAMPLE
Var 2 Var 3 Var 6
Composition, %

Li

Li2O

Si2O

Al2O3

Fe2O3

MgO

CaO

Na2O

K2O

P2O5

0.77

1.66

73.5

16.4

0.57

0.13

0.20

3.39

2.69

0.35

0.81

1.74

73.0

16.4

0.56

0.13

0.32

3.62

2.44

0.47

0.59

1.27

72.5

15.9

0.94

0.30

0.39

3.44

3.40

0.40

 

Table 13-11 shows the semi-quantitative mineralogy based on X-Ray Diffraction (XRD) results for the variability samples. Spodumene content ranged from 13.4% to 17.7%. Muscovite content ranged from 6.0% to 6.5%. Lithium bearing minerals included spodumene, cookeite, and petalite.

 

Table 13-11: Semi-quantitative XRD analysis of the variability samples

 

Mineral Sample
Var 2 Var 3 Var 6
Composition, %

Albite

Quartz

Spodumene

Microcline

Muscovite

Cookeite

Petalite

Biotite

28.0

29.9

17.7

12.2

6.5

3.5

0.5

0.4

28.2

28.2

16.1

9.8

6.1

2.0

6.4

0.3

28.5

29.1

13.4

15.5

6.0

1.9

0.7

1.4

 

13.2.3Heavy Liquid Separation

 

HLS tests were performed on each variability sample at a crush size of -9.5 mm. Interpolated lithium recoveries at 6% Li2O concentrate grade are presented in Table 13-12. Interpolated lithium stage recoveries ranged from 63.3% to 79.8%. Global recoveries include lithium losses to the hypofines (-0.5 mm) fraction and ranged from 49.9% to 66.1%.

 

21501-REP-PM-001
Page | 143

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 13-12: HLS Interpolated stage and global lithium recoveries (6% Li2O concentrate) for each variability sample

 

Recovery Interpolated Lithium Recovery, %
Var 2 Var 3 Var 6
Stage 79.8 63.3 75.2
Global 66.1 49.9 64.6

 

Size-by-size analysis was undertaken for each variability HLS test. The size fractions were: coarse (-9.5 mm / +6.4 mm), fines (-6.4 mm / +1.7 mm), and ultrafines (-1.7 mm / +0.5 mm). Detailed size-by-size HLS mass balances are shown in Table 13-13 to Table 13-15.

 

Lithium recovery was generally seen to increase in the finer size fractions, which is likely due to a higher degree of spodumene liberation. HLS tests produced >6% Li2O spodumene concentrate. Combined spodumene concentrate iron content ranged from 1.21% to 1.63% Fe2O3 (interpolated values for 6% Li2O concentrate). Magnetic separation was only performed on the Var 6 HLS products. Magnetic separation decreased iron content of the concentrate from 1.63% to 0.83% Fe2O3 (interpolated values for 6% Li2O concentrate) (Table 13-16).

 

21501-REP-PM-001
Page | 144

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 13-13: Variability Sample 2 Global HLS Results

 

Combined HLS Products HL SG Weight Assays (%) Distribution (%)
g/cm3 g % Li Li2O SiO2 Al2O3 Fe2O3 MgO CaO Na2O K2O P2O5 Li SiO2 Al2O3 Fe2O3 MgO CaO Na2O K2O P2O5
Spodumene Conc. 2.85 1349 13.5 3.07 6.60 64.0 25.0 1.24 0.12 0.19 0.43 0.32 0.73 63.6 11.7 21.5 24.9 12.3 11.5 1.7 1.6 23.5
Spodumene Conc. (int.*) 2.81 1546 15.5 2.79 6.00 63.6 24.8 1.34 0.18 0.22 0.56 0.82 0.70 66.1 13.4 24.5 30.8 21.5 15.5 2.5 4.7 25.7
Spodumene Conc. 2.80 1569 15.7 2.75 5.93 63.6 24.8 1.35 0.18 0.22 0.58 0.88 0.70 66.4 13.6 24.9 31.5 22.5 16.0 2.6 5.1 26.0
Middlings -2.85 +2.65 1547 15.5 0.39 0.85 70.2 17.9 1.42 0.37 0.42 2.25 3.26 0.41 9.3 14.7 17.7 32.8 45.6 29.6 10.0 18.7 15.0
Middlings (int.) -2.84 +2.65 1350 13.5 0.33 0.71 71.5 17.1 1.34 0.34 0.41 2.36 3.11 0.40 6.8 13.1 14.8 26.9 36.5 25.5 9.2 15.5 12.8
Tailings 1 -2.65+2.50 4835 48.5 0.07 0.14 78.0 12.5 0.26 0.03 0.13 4.62 3.27 0.28 5.0 51.2 38.6 18.6 10.3 29.6 64.5 58.5 32.1
Tailings 2 -2.50 254 2.6 1.29 2.77 72.9 17.1 0.34 0.11 0.10 1.64 2.90 0.18 5.0 2.5 2.8 1.3 2.1 1.2 1.2 2.7 1.1
Hypofines (-0.5 mm)   1984 19.9 0.56 1.21 73.5 15.3 0.76 0.19 0.31 3.94 2.53 0.60 17.1 19.8 19.4 22.4 29.7 28.2 22.6 18.6 28.3
Head  (calc.)   9969 100.0 0.64 1.37 73.9 15.7 0.68 0.13 0.22 3.52 2.71 0.43 100 100 100 100 100 100 100 100 100

 

*int = Interpolated based on production of 6% Li2O concentrate

 

Table 13-14: Variability Sample 3 Global HLS Results

 

Combined HLS Products HL SG
Weight Assays (%) Distribution (%)
g/cm3 g % Li Li2O SiO2 Al2O3 Fe2O3 MgO CaO Na2O K2O P2O5 Li SiO2 Al2O3 Fe2O3 MgO CaO Na2O K2O P2O5
Spodumene Conc. 2.85 1286 12.9 2.84 6.12 65.3 23.7 1.20 0.11 0.46 0.52 0.39 0.87 48.9 11.6 18.6 22.3 11.5 18.3 1.8 2.0 20.9
Spodumene Conc. (int.*) 2.84 1343 13.5 2.79 6.00 65.5 23.5 1.21 0.12 0.48 0.56 0.43 0.85 49.9 12.2 19.2 23.6 13.3 19.9 2.1 2.4 21.3
Spodumene Conc. 2.80 1533 15.3 2.60 5.6 66.3 22.8 1.2 0.2 0.5 0.7 0.6 0.8 53.4 14.0 21.4 27.6 19.4 25.1 2.9 3.4 22.7
Middlings -2.85 +2.65 1536 15.4 0.56 1.20 71.1 17.2 1.36 0.33 0.68 2.34 2.72 0.50 11.5 15.1 16.2 30.3 41.7 32.0 9.9 16.9 14.3
Middlings (int.) -2.84 +2.65 1478 14.8 0.53 1.14 71.1 17.2 1.36 0.32 0.67 2.37 2.78 0.50 10.4 14.5 15.5 29.0 39.8 30.4 9.6 16.6 13.9
Tailings 1 -2.65+2.50 4238 42.4 0.13 0.27 75.2 14.0 0.29 0.02 0.15 5.24 3.20 0.37 7.2 44.0 36.2 17.6 6.4 19.5 60.9 54.7 29.5
Tailings 2 -2.50 565 5.7 1.49 3.22 74.5 16.9 0.42 0.07 0.11 0.89 1.75 0.18 11.3 5.8 5.8 3.5 3.2 1.9 1.4 4.0 1.9
Hypofines (-0.5 mm)   2360 23.6 0.67 1.44 72.3 16.1 0.77 0.19 0.39 4.02 2.35 0.76 21.2 23.5 23.2 26.3 37.2 28.3 26.0 22.4 33.4
Feed (Calc.)   9985 100 0.75 1.61 72.6 16.4 0.69 0.12 0.33 3.65 2.48 0.54 100 100 100 100 100 100 100 100 100

 

*int = Interpolated based on production of 6% Li2O concentrate

 

21501-REP-PM-001
Page | 145

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 13-15: Variability Sample 6 Global HLS Results

 

Combined HLS Products HL SG
Weight Assays (%) Distribution (%)
g/cm3 g % Li Li2O SiO2 Al2O3 Fe2O3 MgO CaO Na2O K2O P2O5 Li SiO2 Al2O3 Fe2O3 MgO CaO Na2O K2O P2O5
Spodumene Conc. 2.90 1209 12.1 2.95 6.35 64.2 24.9 1.49 0.29 0.36 0.44 0.27 0.37 61.5 10.7 18.9 17.7 12.8 11.7 1.6 0.9 11.1
Spodumene Conc. (int.*) 2.86 1345 13.5 2.79 6.00 64.4 24.3 1.63 0.36 0.45 0.54 0.42 0.39 64.6 11.9 20.6 21.6 17.9 16.3 2.1 1.7 13.0
Spodumene Conc. 2.85 1369 13.7 2.76 5.94 64.4 24.2 1.66 0.37 0.47 0.55 0.45 0.39 65.1 12.2 20.9 22.3 18.7 17.1 2.2 1.8 13.4
Middlings -2.90 +2.65 1901 19.1 0.45 0.98 70.6 16.4 2.40 0.74 0.91 2.33 2.84 0.42 14.8 18.5 19.6 44.9 51.8 46.0 12.9 15.9 19.8
Middlings (int.) -2.86+2.65 1764 17.7 0.39 0.83 71.0 16.2 2.36 0.72 0.88 2.41 2.92 0.41 11.7 17.3 17.9 40.9 46.7 41.4 12.4 15.2 17.9
Tailings 1 -2.65+2.50 4995 50.1 0.09 0.20 76.0 13.6 0.23 0.03 0.15 4.52 4.29 0.35 7.9 52.4 42.9 11.4 4.8 20.0 65.6 63.2 43.4
Tailings 2 -2.50 128 1.3 0.75 1.62 68.8 17.6 0.43 0.11 0.13 1.70 7.12 0.40 1.7 1.2 1.4 0.5 0.5 0.5 0.6 2.7 1.3
Hypofines (-0.5 mm) - 1745 17.5 0.47 1.01 71.5 15.7 1.49 0.47 0.47 3.81 3.34 0.56 14.1 17.2 17.2 25.6 30.1 21.8 19.3 17.2 24.4
Feed (Calc.)   9977 100 0.58 1.25 72.7 15.9 1.02 0.27 0.38 3.45 3.40 0.40 100 100 100 100 100 100 100 100 100

 

*int = Interpolated based on production of 6% Li2O concentrate

 

Table 13-16: Variability Sample 6 Global HLS Results with magnetic separation

 

Combined HLS Products HL SG
Weight Assays (%) Distribution (%)
g/cm3 g % Li Li2O SiO2 Al2O3 Fe2O3 MgO CaO Na2O K2O P2O5 Li SiO2 Al2O3 Fe2O3 MgO CaO Na2O K2O P2O5
Spodumene Conc. 2.80 1323 13.3 2.88 6.20 66.6 24.4 0.74 0.03 0.10 0.02 0.46 0.16 65.6 12.2 20.3 9.6 1.3 3.4 0.1 1.8 5.1
Spodumene Conc. (int.*) 2.79 1403 14.1 2.79 6.00 66.7 24.1 0.83 0.06 0.14 0.09 0.58 0.16 66.2 12.9 21.2 12.1 4.3 5.9 0.5 2.7 5.9
Spodumene Conc. 2.70 2164 21.7 1.92 4.13 67.0 21.7 1.67 0.42 0.51 0.75 1.67 0.24 71.5 20.0 29.5 35.6 33.3 29.7 4.8 10.6 12.9
HLS Middling -2.80+2.65 1469 14.7 0.32 0.69 72.8 15.2 2.15 0.65 0.78 2.61 2.71 0.39 8.2 14.7 14.0 31.0 34.7 30.6 11.3 11.7 14.2
Middlings (int.*) -2.79+2.65 1389 13.9 0.32 0.68 73.1 15.0 2.09 0.62 0.76 2.65 2.66 0.39 7.6 14.0 13.1 28.5 31.7 28.1 10.9 10.9 13.4
Mag Sep Conc. -2.95+2.80 318 3.2 0.46 0.98 52.8 21.1 7.01 2.47 2.75 1.54 3.55 1.46 2.5 2.3 4.2 21.9 28.7 23.4 1.5 3.3 11.6
Tailings 1 -2.65+2.50 4995 50.0 0.09 0.20 76.0 13.6 0.23 0.03 0.15 4.52 4.29 0.35 7.9 52.3 42.8 11.3 4.8 20.1 66.8 63.2 43.4
Tailings 2 -2.50 128 1.3 0.75 1.62 68.8 17.6 0.43 0.11 0.13 1.70 7.12 0.40 1.7 1.2 1.4 0.5 0.5 0.5 0.6 2.7 1.3
Hypofines (-0.5 mm) - 1748 17.5 0.47 1.01 71.5 15.7 1.49 0.47 0.47 3.81 3.34 0.56 14.2 17.2 17.2 25.6 30.0 22.0 19.7 17.2 24.5
Head (Calc.)   9980 100 0.58 1.25 72.7 15.9 1.02 0.27 0.37 3.39 3.40 0.40 100 100 100 100 100 100 100 100 100

 

*int = Interpolated based on production of 6% Li2O concentrate

 

21501-REP-PM-001
Page | 146

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

13.2.4Dense Media Separation

 

DMS testing was performed on the variability samples on the coarse (-9.5 mm / +6.4 mm), fines (-6.4 mm / +1.7 mm) and ultrafines (-1.7 mm / +0.5 mm) size fractions separately. Dry magnetic separation was performed on each of the concentrate streams.

 

DMS feed was pre-screened at 0.5 mm to remove fine particles. The density of the circulating media was controlled to produce the desired SG cut-points and tracer tests were conducted prior to testing to ensure that the media SG was at the desired target.

 

Each size fraction underwent two DMS passes. The first pass was operated at a lower density to reject silicate gangue minerals (SG of 2.65). The first pass sink product was repassed through the DMS at a higher density cut-point to produce spodumene concentrate. The SG cut-points for the second pass were chosen based on interpolated HLS data for the production of 6% Li2O spodumene concentrate. Cut-points for Var 6 were based on HLS and magnetic separation results. Target SG cut-points ranged from 2.78 to 2.89.

 

13.2.4.1DMS Results

 

Table 13-17 summarizes the DMS and magnetic separation results for each sample by size fraction. The results show that 6% Li2O concentrate was generally produced (other than the fines fraction for Var 6 which produced 5.92% Li2O concentrate). In all cases, magnetic separation was able to effectively lower the iron content of the concentrate to <1% Fe2O3. Lithium stage recoveries by size fraction ranged from 45.7% to 79.7%.

 

Table 13-17: DMS and magnetic separation results by size fraction

 

SAMPLE COARSE FINES ULTRAFINES
% Li2O % Fe2O3

Li Rec.*,

%

% Li2O % Fe2O3

Li Rec.*,

%

% Li2O % Fe2O3

Li Rec.*,

%

Var 2 6.09 0.69 67.0 6.24 0.66 66.9 6.91 0.70 67.1
Var 3 6.41 0.60 49.3 6.28 0.60 58.0 7.10 0.60 45.7
Var 6 6.03 0.74 70.9 5.92 0.72 79.7 6.78 0.70 69.3

 

*Stage lithium recovery

 

Combined DMS and magnetic separation stage results for the three variability samples are shown in Table 13-18, Table 13-19, and Table 13-20. Lithium stage recoveries for Var 2, Var 3, and Var 6 were 66.9%, 53.2% and 74.7%, respectively. Each combined concentrate graded >6% Li2O with low iron content (<1% Fe2O3) after magnetic separation.

 

Lithium deportment to the middlings stream was relatively high for sample Var 3 at 17.6%, compared to 9.9% and 12.7% in Var 2 and Var 6 respectively.

 

Mass rejection to the tailings stream (SG -2.65) ranged from 46.2% to 58.1% with lithium losses ranging from 9.8% to 24.8%.

 

The Var 6 feed sample contained 10% dilution (schist) compared to 3% in the other two samples. Iron content in the Var 6 DMS concentrate was relatively high at 1.92% Fe2O3. Magnetic separation was able to reduce iron content to 0.71% Fe2O3 with a 2.6% lithium loss to the magnetic concentrate.

 

21501-REP-PM-001
Page | 147

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 13-18: Var 2 Combined DMS stage results

 

Product Weight Assays (%) Distribution (%)
kg % Li Li2O SiO2 Al2O3 Fe2O3 MgO CaO Na2O K2O P2O5 Li SiO2 Al2O3 Fe2O3 MgO CaO Na2O K2O P2O5
DMS Conc. Non-Mag 73.7 16.3 2.92 6.29 66.6 24.7 0.68 0.04 0.06 0.50 0.32 0.13 66.9 14.8 24.5 16.6 4.65 4.20 2.22 1.98 6.0
DMS Conc. Mag 7.83 1.73 1.18 2.54 52.0 24.6 5.96 1.05 1.35 1.07 4.20 2.67 2.9 1.2 2.6 15.6 12.93 10.5 0.5 2.7 13.4
DMS Middling 120 26.5 0.26 0.57 77.1 13.4 1.06 0.30 0.36 3.55 1.87 0.36 9.9 27.9 21.7 42.3 57.08 42.4 25.5 18.7 27.5
DMS Tailings 251 55.4 0.26 0.56 73.9 15.2 0.30 0.06 0.17 4.78 3.66 0.33 20.3 56.0 51.3 25.4 25.3 42.9 71.8 76.5 53.1
Head (calc.) 452 100 0.71 1.53 73.2 16.5 0.66 0.14 0.22 3.69 2.65 0.35 100 100 100 100 100 100 100 100 100
DMS Conc. 81.5 18.0 2.75 5.93 65.2 24.7 1.18 0.14 0.18 0.56 0.69 0.37 69.8 16.1 27.1 32.2 17.6 14.7 2.7 4.7 19.4

 

Table 13-19: Var 3 Combined DMS stage results

 

Product Weight Assays (%) Distribution (%)
kg % Li Li2O SiO2 Al2O3 Fe2O3 MgO CaO Na2O K2O P2O5 Li SiO2 Al2O3 Fe2O3 MgO CaO Na2O K2O P2O5
DMS Conc. Non-Mag 34.9 13.8 2.99 6.43 67.7 23.7 0.58 0.01 0.06 0.56 0.30 0.23 53.2 12.8 19.9 12.3 1.46 2.49 2.10 1.65 7.24
DMS Conc. Mag 4.90 1.94 1.79 3.85 54.6 22.5 4.42 0.84 3.72 0.83 2.24 3.37 4.47 1.45 2.65 13.1 13.3 22.0 0.44 1.73 14.6
DMS Middling 66.1 26.1 0.52 1.12 74.8 14.9 1.13 0.30 0.57 3.17 1.92 0.48 17.6 26.7 23.6 45.1 62.8 45.7 22.5 19.9 28.3
DMS Tailing 147 58.1 0.33 0.71 74.2 15.3 0.33 0.05 0.17 4.74 3.33 0.38 24.8 59.0 53.9 29.6 22.5 29.8 74.9 76.8 49.9
Head (calc.) 253 100 0.78 1.67 73.0 16.5 0.65 0.12 0.33 3.67 2.52 0.45 100 100 100 100 100 100 100 100 100
DMS Conc. 39.8 15.8 2.84 6.11 66.1 23.5 1.05 0.12 0.51 0.59 0.54 0.62 57.7 14.2 22.5 25.4 14.7 24.5 2.5 3.4 21.9

 

21501-REP-PM-001
Page | 148

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 13-20: Var 6 Combined DMS stage results

 

Product Weight Assays (%) Distribution (%)
kg % Li Li2O SiO2 Al2O3 Fe2O3 MgO CaO Na2O K2O P2O5 Li SiO2 Al2O3 Fe2O3 MgO CaO Na2O K2O P2O5
DMS Conc. Non-Mag 53.3 17.4 2.82 6.06 67.1 23.8 0.72 0.05 0.16 0.63 0.44 0.21 74.7 16.1 25.6 12.1 2.80 6.51 3.17 2.66 9.7
DMS Conc. Mag 12.4 4.04 0.45 0.94 53.6 20.1 7.10 2.58 3.34 1.61 3.09 1.35 2.77 2.98 5.03 27.7 36.3 30.8 1.90 4.34 14.6
DMS Middling 99 32.4 0.26 0.55 77.1 12.9 1.38 0.43 0.54 3.55 1.85 0.36 12.7 34.4 26.0 43.1 48.4 40.1 33.5 20.9 31.3
DMS Tailing 142 46.2 0.14 0.30 73.2 15.2 0.38 0.08 0.21 4.58 4.49 0.36 9.8 46.5 43.4 17.1 12.5 22.6 61.5 72.1 44.4
Head (calc.) 306 100 0.66 1.41 72.6 16.1 1.04 0.29 0.44 3.44 2.87 0.37 100 100 100 100 100 100 100 100 100
DMS Conc. 65.7 21.4 2.37 5.10 64.5 23.1 1.92 0.52 0.76 0.81 0.94 0.42 77.5 19.1 30.6 39.9 39.1 37.4 5.1 7.0 24.3

 

21501-REP-PM-001
Page | 149

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 13-21, Table 13-22, and Table 13-23 show the combined global DMS mass balances for Var 2, Var 3, and Var 6, respectively.

 

After dry magnetic separation, combined concentrate grades ranged from 6.06% to 6.43% Li2O with lithium recoveries ranging from 46.1% to 64.2%. Mass reporting to the hypofines (-0.5 mm) fraction ranged from 14.0% to 18.4% with lithium losses ranging from 11.0 to 14.1%.

 

For magnetic separation on the DMS concentrate samples, combined results showed 9.6% mass rejection and decrease in overall lithium recovery of 2.9% for variability sample 2, 12.3% mass rejection and decrease in overall lithium recovery of 4.5% for variability sample 3, and 18.9% mass rejection and decrease in overall lithium recovery of 2.6% for variability sample 6.

 

21501-REP-PM-001
Page | 150

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 13-21: Var 2 Combined Global DMS results

 

Product Weight Assays (%) Distribution (%)
kg % Li Li2O SiO2 Al2O3 Fe2O3 MgO CaO Na2O K2O P2O5 Li SiO2 Al2O3 Fe2O3 MgO CaO Na2O K2O P2O5
DMS Conc. Non-Mag 73.7 14.0 2.92 6.29 66.6 24.7 0.68 0.04 0.06 0.50 0.32 0.13 59.6 12.8 21.1 13.4 3.82 3.39 1.89 1.70 4.69
DMS Conc. Mag 7.83 1.49 1.18 2.54 52.0 24.6 5.96 1.05 1.35 1.07 4.20 2.67 2.6 1.1 2.2 12.6 10.62 8.5 0.4 2.4 10.5
DMS Middling 120 22.8 0.26 0.57 77.1 13.4 1.06 0.30 0.36 3.55 1.87 0.36 8.8 24.0 18.7 34.2 46.9 34.2 21.7 16.1 21.6
DMS Tailings 251 47.7 0.26 0.56 73.9 15.2 0.30 0.06 0.17 4.78 3.66 0.33 18.1 48.19 44.21 20.6 20.82 34.62 61.10 65.80 41.66
Hypofines (-0.5 mm) 73.4 14.0 0.54 1.16 73.1 16.18 0.97 0.19 0.33 3.97 2.67 0.59 11.0 14.0 13.8 19.2 17.8 19.3 14.9 14.0 21.6
Head (calc.) 525 100 0.69 1.48 73.2 16.4 0.71 0.15 0.24 3.73 2.65 0.38 100 100 100 100 100 100 100 100 100
DMS Conc. 81.5 15.5 2.75 5.93 65.2 24.7 1.18 0.14 0.18 0.56 0.69 0.37 62.2 13.8 23.3 26.0 14.4 11.9 2.3 4.1 15.2

 

Table 13-22: Var 3 Combined Global DMS results

 

Product Weight Assays (%) Distribution (%)
kg % Li Li2O SiO2 Al2O3 Fe2O3 MgO CaO Na2O K2O P2O5 Li SiO2 Al2O3 Fe2O3 MgO CaO Na2O K2O P2O5
DMS Conc. Non-Mag 34.9 11.5 2.99 6.43 67.7 23.7 0.58 0.01 0.06 0.56 0.30 0.23 46.1 10.6 16.5 9.49 1.13 1.95 1.72 1.38 5.45
DMS Conc. Mag 4.90 1.61 1.79 3.85 54.6 22.5 4.42 0.84 3.72 0.83 2.24 3.37 3.88 1.20 2.21 10.1 10.29 17.2 0.36 1.44 11.0
DMS Middling 66.1 21.7 0.52 1.12 74.8 14.9 1.13 0.30 0.57 3.17 1.92 0.48 15.2 22.2 19.6 34.8 48.7 35.8 18.5 16.6 21.3
DMS Tailings 147 48.3 0.33 0.71 74.2 15.3 0.33 0.05 0.17 4.74 3.33 0.38 21.5 49.1 44.9 22.9 17.4 23.3 61.6 64.3 37.5
Hypofines (-0.5 mm) 51.3 16.9 0.59 1.26 72.6 16.2 0.95 0.18 0.45 3.93 2.42 0.72 13.3 16.8 16.7 22.7 22.4 21.8 17.9 16.3 24.8
Head (calc.) 304 100 0.74 1.60 73.0 16.4 0.70 0.13 0.35 3.72 2.50 0.49 100 100 100 100 100 100 100 100 100
DMS Conc. 39.8 13.1 2.84 6.11 66.1 23.5 1.05 0.12 0.51 0.59 0.54 0.62 50.0 11.9 18.8 19.6 11.4 19.2 2.1 2.8 16.4

 

21501-REP-PM-001
Page | 151

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 13-23: Var 6 Combined Global DMS results

 

Product Weight Assays (%) Distribution (%)
kg % Li Li2O SiO2 Al2O3 Fe2O3 MgO CaO Na2O K2O P2O5 Li SiO2 Al2O3 Fe2O3 MgO CaO Na2O K2O P2O5
DMS Conc. Non-Mag 53.3 14.2 2.82 6.06 67.1 23.8 0.72 0.05 0.16 0.63 0.44 0.21 64.2 13.1 21.0 9.6 2.25 5.35 2.54 2.14 7.21
DMS Conc. Mag 12.4 3.3 0.45 0.97 53.6 20.1 7.10 2.58 3.34 1.61 3.09 1.35 2.38 2.43 4.12 21.9 29.1 25.4 1.50 3.50 10.9
DMS Middling 99 26.4 0.26 0.55 77.1 12.9 1.40 0.43 0.54 3.55 1.85 0.36 10.9 28.0 21.3 34.0 38.8 33.0 26.8 16.7 23.4
DMS Tailings 142 37.7 0.14 0.30 73.2 15.2 0.38 0.08 0.21 4.58 4.49 0.36 8.42 37.9 35.5 13.5 10.0 18.6 49.2 57.9 33.1
Hypofines (-0.5 mm) 69.2 18.4 0.48 1.02 72.9 15.9 1.23 0.31 0.42 3.82 3.13 0.56 14.1 18.5 18.1 21.1 19.7 17.8 20.0 19.7 25.4
Head (calc.) 376 100 0.62 1.34 72.7 16.1 1.07 0.29 0.43 3.51 2.92 0.41 100 100 100 100 100 100 100 100 100
DMS Conc. 65.7 17.5 2.37 5.10 64.5 23.1 1.92 0.52 0.76 0.81 0.94 0.42 66.6 15.5 25.1 31.5 31.4 30.7 4.1 5.6 18.1

 

21501-REP-PM-001
Page | 152

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

13.2.5Comparison of the 2019 and 2021 Results

 

Table 13-24 compares the results obtained in the 2019 and 2021 variability test work program. Combined concentrate grade for variability sample 2 increased from 6.16% Li2O to 6.29% Li2O while global lithium recovery increased from 46.1% to 59.6%. Combined concentrate grade for variability sample 3 increased from 6.33% Li2O to 6.43% Li2O while global lithium recovery decreased from 56.1% to 46.1%. Combined concentrate grade for variability sample 6 decreased from 6.12% Li2O to 6.06% Li2O while global lithium recovery increased from 50.5% to 64.2%.

 

Table 13-24: Summary of 2019 and 2021 DMS and magnetic separation concentrate grade and global recovery (including hypofines fraction)

 

SAMPLE STREAM 2019 2021
% LI2O GLOBAL
LITHIUM
RECOVERY,
%
% LI2O GLOBAL
LITHIUM
RECOVERY,
%
Var 2

Coarse Fraction

Fines Fraction

Ultrafines Fraction

6.26

6.09

5.98

22.9

17.8

5.4

6.09

6.24

6.91

20.5

29.2

9.9

Combined 6.16 46.1 6.29 59.6
Var 3

Coarse Fraction

Fines Fraction

Ultrafines Fraction

6.57

6.01

6.48

27.8

22.3

6.1

6.41

6.28

7.10

13.8

25.8

6.50

Combined 6.33 56.1 6.43 46.1
Var 6

Coarse Fraction

Fines Fraction

Ultrafines Fraction

6.14

6.11

6.07

21.3

20.3

8.9

6.03

5.92

6.78

23.3

32.0

8.98

Combined 6.12 50.5 6.06 64.2

 

13.2.6Xuxa Recovery and Basis of Assumptions

 

During the 2019 test work program, Var 3 and Var 4 samples were determined to best represent the deposit. The global recovery was based on the average of the recoveries of these samples and estimated at 60.4% for the DMS circuit, which includes coarse, fines and ultrafines material as summarized in Table 13-25. The global recovery of 60.4% Li2O was reconfirmed in the 2021 results.

 

21501-REP-PM-001
Page | 153

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 13-25: Estimates of DMS Circuit Recovery

 

DMS
CIRCUIT
DETAILED
ESTIMATE
Coarse (-9.5+6.3 mm) 24.7%
Fines (-6.3+1.7 mm) 26.1%
Ultrafines (-1.7+0.5 mm) 9.6%
Global DMS Recovery 60.4%

 

13.2.7Impact of Lower Recovery Grade on Recovery

 

The changing market conditions have necessitated the evaluation of a lower product grade and its impact on recovery. An independent DMS expert has evaluated the Xuxa test work date to determine the affect of reducing the product grade on recovery.

 

The following HLS and compost test work was used as the basis of the estimation

 

6 HLS variability samples

3 Pilot composite samples

 

This set of data was then used in the calculations to determine the impact of decreasing the product grade from 6% to 5.5% on Li2O recovery and yield. Both Li2O recovery and product yield calculations are on a global basis i.e., relative to the fresh feed inclusive of the fines. It has been assumed that the fines do not contribute to the product and have been assigned a zero yield.

 

13.2.7.1Increase in Li2O Recovery

 

The comparative results for a 9.5 mm top size are shown in Figure 13-7. The results for the variability and composite samples are shown separately.

 

For a 6% product grade, the median results from the variability and composite samples were similar. When reducing the product grade to 5.5%, the variability samples resulted in a higher recovery compared to the composite samples.

 

The relative increase in Li2O recovery is shown in Figure 13-8.

 

The median values for the composite and variability samples are 4.6 and 9.8% respectively.

 

21501-REP-PM-001
Page | 154

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 13-7: Comparative Results for 5.5% and 6.0% Li2O Global Recovery for 9.5 mm Top Size

 

21501-REP-PM-001
Page | 155

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

 

Figure 13-8: Relative Increase in Global Li2O Recovery for 9.5 mm Top Size

 

13.2.7.2Increase in Li2O Yield

 

The comparative results for a 9.5 mm top size are shown in Figure 13-9. The results for the variability and composite samples are shown separately.

 

For both 6% and 5.5%, the variability samples gave a higher yield compared to the composite samples.

 

The relative increase in yield is shown in Figure 13-10.

 

The median values for the composite and variability samples are 14.1 and 19.8% respectively.

 

21501-REP-PM-001
Page | 156

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 13-9: Comparative Results for 5.5% and 6.0% Li2O Global Yield for 9.5 mm Top Size

 

21501-REP-PM-001
Page | 157

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

 

Figure 13-10: Relative Increase in Global Li2O Yield for 9.5 mm Top Size

 

13.2.7.3Recommendation

 

The relative increases are summarized in Table 13-26.

 

Table 13-26: Summary of Global Recovery and Yield at 5.5% Li2O for 9.5 mm Top Size

 

  Variability Composite Overall
Global Li2O Recovery (%) 9.8 4.6 7.9
Global Yield (%) 19.8 14.1 17.7

 

Note: the overall percentage assumes an equal weighting between the variability and composite results.

 

It is estimated that recovery will increase by between 4.6% and 9.8% when product grade is dropped to 5.5%, so it is a fair and conservative assumption to assume the lower end of range.

 

It is recommended that for a product grade of 5.5% a global recovery of 65% can be assumed.

 

13.3Barreiro Metallurgical Test Work (2020-21)

 

13.3.1Overview

 

A scoping-level metallurgical test work program was undertaken on samples from the Barreiro deposit from November 2020 to May 2021 at SGS Canada Inc. (Lakefield, Ontario). Four variability and one composite sample were tested. The test work program included:

 

Sample preparation and characterization

Grindability testing

Heavy liquid separation (HLS)

 

21501-REP-PM-001
Page | 158

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

The goals of the program were to provide preliminary process information on the metallurgical performance of ore samples from the Barreiro deposit. The test work program was developed based on previous test work and flowsheet developed for the Xuxa deposit. The aim of the test work program was to produce chemical-grade spodumene concentrate (>6% Li2O) with low iron content (<1% Fe2O3), while maximizing lithium recovery.

 

13.3.2Sample Selection

 

The aim of the Barreiro sample selection process for the metallurgical test work program was to select four variability samples of at least 100 kg. Sub-samples from each variability sample would then be blended to create a master composite. Seven hundred and thirteen (713) individual samples were available at SGS Canada Inc. (Lakefield, ON) for production of the variability samples. Figure 13-11 depicts the lithium (Li2O) grades and the localization within the Barreiro deposit of the drill hole intervals used for producing the variability samples.

 

 

 

Figure 13-11 – Lithium (Li2O) Grade and Localization of the Drill Holes used to produce the Barreiro Variability Samples

 

Inadequate attention to sample selection can compromise the adequacy of the metallurgical test work results. This in turn could ultimately limit the ability of the full-scale metallurgical plant design to handle changes in ore composition over the life of the mine. When the samples selected for testing are fully representative of the orebody and of the mine plan, it is easier to predict and reconcile the expected plant performance.

 

The database received by SGS contained information related to collars, surveys, assays and lithology. In addition, a very detailed table of lithium mineralogy including the petalite content of the rock was included in the database. We also added the geology (rock type) as number variables to handle contents of each. To begin, SGS enhanced the database by including variables to facilitate the sample selection process including the ‘TotPet_per’ variable that represents the percentage of lithium contained in petalite. In terms of metallurgical performance, this is critical information as petalite is a lithium-bearing mineral which is non-recoverable by Dense Media Separation (DMS). Based on discussions with SGS metallurgy and the resource QP, it was decided to select samples with varying lithium and petalite grades as shown in Table 13-26.

 

21501-REP-PM-001
Page | 159

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

The target lithium grades and petalite content were based on statistical analysis of the full database using declustering and standard tools (e.g., histograms, averages, medians). To begin, fifteen (15) of the seven hundred and thirteen (713) available samples were rejected because they came from outside the mineralized bodies. The ‘TotPet_per’ ranges from 0% (no lithium in petalite) to 100% (all the lithium is in petalite). The ‘TotPet_per’ average was 12% for the deposit. The remaining 698 samples were separated into the four variability samples that are representative of the deposit and meet the sample selection objectives (Table 13-27).

 

The masses of the selected samples are shown in Table 13-27. The master composite was recommended to contain 28.5% of variability sample 1, 24.5% of sample 2, 23.5% of sample 3 and 23.5% of sample 4.

 

Table 13-27 – Description of Barreiro Variability Samples

 

Variability
Sample
Description 1 m
Intervals
Mass, kg
1 Average lithium grade and high petalite 142 233.8
2 High lithium grade and normal petalite 172 297.1
3 Average lithium grade and normal petalite 212 366.3
4 Low grade and normal petalite 172 268.6
  Total: 698 1165.8

 

In conclusion, we have succeeded in producing four variability samples with the material available that reached the objectives related to material type and the required quantity to carry out metallurgical test work.

 

13.3.3Test Work Results

 

13.3.3.1Sample Preparation and Characterization

 

Chemical analysis of the four variability samples and the composite sample are shown in Table 13-28. The head grades of the variability samples ranged from 0.88% Li2O in the Variability sample 4 (Var 4) to 2.09% Li2O in the Var 2 sample. The Var 3 and Composite samples have the lithium content closest to the average lithium grade of the deposit (approximately 1.4% Li2O).

 

Table 13-28 – Variability Sample and Composite Sample Assays

 

Element
/ Oxide
Sample
Var 1 Var 2 Var 3 Var 4 Composite
Composition, %
Li 0.51 0.97 0.63 0.41 0.69
Li2O 1.10 2.09 1.35 0.88 1.48
Si2O 73.1 73.8 74.3 73.3 73.7
Al2O3 16.3 16.6 15.9 16.2 16.3
Fe2O3 0.30 0.23 0.22 0.31 0.26
CaO 0.11 0.08 0.09 0.10 0.08
Na2O 3.73 3.49 3.88 4.17 3.75

 

21501-REP-PM-001
Page | 160

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Element
/ Oxide
Sample
Var 1 Var 2 Var 3 Var 4 Composite
Composition, %
K2O 2.58 2.15 2.58 2.93 2.64
P2O5 0.50 0.49 0.54 0.54 0.48
MnO 0.10 0.10 0.08 0.10 0.08
Ta2O5 0.01 <0.01 0.01 <0.01 0.01
SnO2 0.02 0.01 0.02 0.03 0.02

 

Table 13-29 shows the semi-quantitative X-ray Diffraction (XRD) results for the four variability samples and the composite sample. Spodumene content ranged from 7.8% to 20.9%.

 

Table 13-29 – Semi-quantitative XRD analysis of the four variability samples and the composite sample

 

Mineral Sample
Var 1 Var 2 Var 3 Var 4 Composite
Composition, %
Albite 32.6 28.8 32.4 33.0 31.4
Quartz 31.0 29.9 30.8 31.4 29.7
Spodumene 10.3 20.9 13.2 7.8 14.4
K-feldspar 12.3 10.4 12.2 12.5 10.5
Mica 6.1 4.9 6.1 9.8 7.8
Cookeite 4.2 2.5 2.5 2.3 2.8
Petalite 2.0 1.6 1.9 2.0 2.2
Ferrisicklerite 0.9 1.0 0.9 1.2 1.1
Beryl 0.6 - - - -

 

Based on the semi-quantitative XRD analysis, the amount of lithium contained in spodumene was estimated for each sample (Table 13-30). Lithium present in spodumene ranged from 69.4% to 87.3%. The non-spodumene lithium-bearing minerals present were cookeite, petalite, and ferrisicklerite. Cookeite and petalite are low SG minerals (<2.7) which are unlikely to be recovered to the DMS concentrate. Ferrisicklerite has a relatively high SG (3.2 – 3.4) and is likely to report to the concentrate.

 

Table 13-30 – Estimates of Lithium Deportment to Spodumene

 

Mineral Lithium Deportment, %
Var 1 Var 2 Var 3 Var 4 Composite
Spodumene 73.2 87.3 81.0 69.4 79.9

 

21501-REP-PM-001
Page | 161

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

13.3.3.2Grindability Tests

 

Bond ball mill work index (BWi) and Abrasion index (Ai) tests were undertaken on subsamples of the Composite sample and Variability sample 3, respectively.

 

The Composite sample was classified as moderately hard with a BWi of 15.3 kWh/t. Figure 13-12 shows the BWi of the composite sample as compared to the SGS database. The sample falls into the 62nd percentile of hardness.

 

 

 

Figure 13-12 – BWi of the Composite Sample compared to the SGS Database

 

Variability sample 3 was classified as moderately abrasive with an Ai of 0.450 g. Figure 13-13 shows the Ai of the Var 3 sample as compared to the SGS database. The sample falls into the 71st percentile of abrasivity.

 

 

 

Figure 13-13 – Ai of Var 3 compared to the SGS Database

 

21501-REP-PM-001
Page | 162

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

13.3.4Heavy Liquid Separation

 

Two sets of HLS tests were undertaken. The first set was conducted on a sub-sample of the Composite to test optimal crush size (i.e., top size of 15.9 mm, 12.5 mm, 10.0 mm, and 6.3 mm). HLS tests were then performed on each variability sample at the optimum crush size. The fine fraction (i.e., -0.5 mm) was screened out from each sub-sample and the oversize fraction was submitted for HLS testing with a heavy liquid comprised of methylene iodide diluted with acetone. Each HLS test included specific gravity (SG) cut points of 2.95, 2.90, 2.85, 2.80, 2.70, 2.65, 2.60, 2.50, and 2.45.

 

13.3.4.1HLS: Composite Sample Optimal Crush Size

 

Grade - recovery curves (stage and global) for the HLS tests to determine optimal crush size are presented in Figure 13-14 and Figure 13-15, respectively.

 

Lithium stage and global recoveries were estimated (interpolated) for 6.0% Li2O concentrate and generally increased with decreasing particle size most likely due to increased spodumene liberation (Table 13-31). Estimated lithium stage recovery for the production of 6.0% Li2O concentrate ranged from 55.4% for the -15.9 mm crush size to 70.2% for the -6.3 mm crush size.

 

Table 13-31 – HLS Interpolated stage and global lithium recoveries (6% Li2O concentrate) for each crush size

 

Recovery Estimated Lithium Recovery, %
-15.9 mm -12.5 mm -10.0 mm -6.3 mm
Stage 55.4 62.4 66.1 70.2
Global 49.6 55.1 56.1 56.1

 

Global lithium recoveries while producing a 6% Li2O spodumene concentrate were maximized at both 6.3 mm and 10.0 mm crush size. The 10 mm crush size was selected for the variability HLS tests to maximize recovery and to correspond with previous test work and process design for the Xuxa lithium DMS operation.

 

21501-REP-PM-001
Page | 163

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 13-14 – Cumulative Lithium Grade - Stage Recovery Curves for HLS Tests

 

 

Figure 13-15 – Cumulative Lithium Grade – Global Recovery Curves for HLS Tests

 

Tests results showed that a significant amount of lithium (16% to 27.8%) reported to the HLS tailings (-2.65 SG). To further investigate the lithium losses, XRD analysis was undertaken on certain samples from the HLS test with -10.0 mm crush size (SG 2.60 sink, SG 2.50 sink, SG 2.45 sink, and SG 2.45 float samples). XRD results are shown in Table 13-32. The samples contain low concentrations of spodumene (<2%) and elevated concentrations of petalite (concentrating to 67% in the 2.45 floats stream). Other lithium-bearing minerals present were cookeite, triphylite, and tiptopite.

 

21501-REP-PM-001
Page | 164

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 13-32 – Semi-Quantitative XRD Analysis for Selected Samples (-10 mm crush size)

 

Mineral Sink
2.60
Sink
2.50
Sink
2.45
Float
2.45
Composition, %
Albite 40.9 43.0 11.0 2.5
Quartz 48.6 11.1 7.9 5.9
K-feldspar 3.9 36.4 43.2 10.9
Petalite 0.7 3.9 23.9 67.0
Muscovite 1.6 2.2 6.3 3.8
Cookeite 1.5 1.2 4.2 3.5
Spodumene 1.4 0.8 1.9 2.0
Kaolinite 0.8 0.5 0.7 1.4
Analcime - - - 1.9
Triphylite 0.5 0.9 0.2 -
Tiptopite - - 0.7 -
Zabuyelite - - - 1.1
TOTAL 100 100 100 100

 

13.3.4.2HLS: Variability Samples

 

HLS tests were performed on each variability sample at the chosen crush size of -10 mm. Interpolated lithium recoveries at 6% Li2O concentrate grade are presented in Table 13-33. Interpolated lithium stage recoveries ranged from 56.0% to 77.3%. The highest lithium stage recovery was obtained with the Var 2 sample, estimated to be 77.3%. Global recoveries include lithium losses to the hypofine (-0.5 mm) fraction and ranged from 50.0% to 67.2%.

 

Table 13-33 – HLS Interpolated Stage and Global Combined Lithium Recoveries (6% Li2O concentrate) for each Variability Sample

 

Recovery Interpolated Lithium Recovery, %
Var 1 Var 2 Var 3 Var 4
Stage 56.0 77.3 63.9 61.9
Global 50.0 67.2 53.9 55.0

 

Size-by-size analysis was undertaken for each variability HLS test. Size fractions were chosen to generate fairly equal mass distributions (and to mimic the Xuxa test work and process design). The size fractions chosen were: coarse (-10.0 mm / +6.4 mm), fines (-6.4 mm / +1.7 mm), and ultrafines (-1.7 mm / +0.5 mm). Detailed size-by-size HLS mass balances are shown in Table 13-34 to Table 13-37.

 

In all four variability samples, the SG cut points were fairly similar for the different size fractions. Lithium recovery was generally seen in the fines fraction (-6.4 mm / +1.7 mm) increased with finer size fraction, which is likely due to a higher degree of spodumene liberation in the finer size fractions. HLS tests produced >6% Li2O spodumene concentrate with low iron content (<1.0% Fe2O3) from each variability sample.

 

21501-REP-PM-001
Page | 165

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 13-34 – Variability Sample 1 Global HLS Results  

 

 

Table 13-35 – Variability Sample 2 Global HLS Results

 

 

21501-REP-PM-001
Page | 166

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 13-36 – Variability Sample 3 Global HLS Results

 

 

Table 13-37 – Variability Sample 4 Global HLS Results

 

 

21501-REP-PM-001
Page | 167

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

13.3.5Dense Media Separation

 

The DMS test work was performed on the Composite sample on the coarse (-10 mm / +6.4 mm), fine (-6.4 mm / +1.7 mm) and ultrafine (-1.7 mm / +0.5 mm) size fractions separately. Dry magnetic separation at 10,000 gauss was performed on the feed prior to DMS test work.

 

DMS feed was pre-screened at 500 μm to remove fine particles. The density of the circulating media was controlled to produce the desired SG cut-points and tracer tests were conducted prior to testing to ensure that the SG was at the desired target.

 

Each size fraction underwent two DMS passes. The first pass was operated at a lower density to reject silicate gangue minerals (SG of 2.65). The first pass sink product was repassed through the DMS at a higher density cut-point to produce spodumene concentrate. The cut-points for the second pass were based on interpolated HLS data for the production of 6% Li2O spodumene concentrate. The coarse, fine, and ultrafine density target cut-points were 2.84, 2.82, and 2.82, respectively. SG cut-points for each DMS pass were selected based on the variability sample HLS results.

 

13.3.5.1DMS Results

 

DMS and magnetic separation stage results for the coarse, fines and ultrafines fractions are shown in Table 13-38, Table 13-39, and Table 13-40, respectively.

 

Coarse DMS concentrate grade was slightly below target at 5.72% Li2O with lithium stage-recovery of 58.1%. Mass pull to the concentrate was 14.8% and iron content of the concentrate was 0.34% Fe2O3. A significant proportion of the lithium in the coarse fraction (22.0%) reported to the middlings stream which graded 0.95% Li2O. The tailings contained 0.54% Li2O which accounted for 50% of the mass of the coarse fraction and contained 18.6% of the lithium.

 

The fines fraction DMS produced concentrate grading 6.20% Li2O with a stage recovery of 60.5% in 13.2% of the mass. Sixteen percent (16.0%) of the lithium reported to the middlings, which had a grade of 1.12% Li2O and a mass yield of 19.4%. The fines DMS tailings graded 0.45% with 21.9% lithium stage-losses in 65.9% of the mass. Dry magnetic separation did show some success in rejecting iron, with the magnetic concentrate upgraded to 3.55 % Fe2O3 with lithium losses of only 1.65%.

 

For the ultrafines fraction, relatively high-grade spodumene concentrate was produced (6.48% Li2O) with 58.6% lithium stage-recovery and a relatively low mass yield of 11.5%. The middlings graded 1.03% Li2O and accounted for 13.2% of the lithium. The ultrafines DMS tailings had a mass yield of 68.5% and accounted for 23.3% of the lithium.

 

21501-REP-PM-001
Page | 168

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 13-38 – Coarse fraction DMS stage results

 

Product Weight Assays (%) Distribution (%)
kg % Li Li2O SiO2 Al2O3 Fe2O3 MgO CaO Na2O K2O P2O5 MnO Li SiO2 Al2O3 Fe2O3 MgO CaO Na2O K2O P2O5 MnO
Concentrate 22.0 14.8 2.66 5.72 67.3 24.1 0.34 0.01 0.04 0.73 0.38 0.28 0.09 58.1 13.7 21.4 16.7 3.32 6.66 2.74 2.10 8.46 17.0
Middling 50.5 33.8 0.44 0.95 77.1 14.3 0.44 0.02 0.10 4.04 1.43 0.55 0.11 22.0 35.9 29.2 49.7 15.2 38.2 34.8 18.1 38.1 47.6
Tailings 75.0 50.3 0.25 0.54 71.5 15.8 0.11 0.05 0.09 4.84 4.12 0.45 0.03 18.6 49.6 47.9 18.5 56.6 51.1 62.0 77.5 46.4 19.3
Mag Conc. 1.7 1.11 0.80 1.72 53.6 23.3 4.11 1.00 0.33 1.42 5.59 3.10 1.14 1.31 0.82 1.55 15.2 24.9 4.12 0.40 2.31 7.03 16.1
Coarse (calc.) 149 100 0.68 1.45 72.6 16.6 0.30 0.04 0.09 3.93 2.67 0.49 0.08 100 100 100 100 100 100 100 100 100 100

 

Table 13-39 – Fines fraction DMS stage results

 

Product Weight Assays (%) Distribution (%)
kg % Li Li2O SiO2 Al2O3 Fe2O3 MgO CaO Na2O K2O P2O5 MnO Li SiO2 Al2O3 Fe2O3 MgO CaO Na2O K2O P2O5 MnO
Concentrate 38.1 13.2 2.88 6.20 66.5 25.0 0.34 0.01 0.06 0.49 0.35 0.28 0.10 60.5 12.0 20.7 19.9 1.9 6.48 1.72 1.72 19.6 4.62
Middling 55.8 19.4 0.52 1.12 77.7 14.5 0.38 0.02 0.06 2.91 1.64 0.49 0.08 16.0 20.5 17.6 32.6 5.5 9.48 14.98 11.8 50.3 5.41
Tailings 190 65.9 0.21 0.45 74.1 14.4 0.09 0.08 0.15 4.72 3.42 0.02 0.37 21.9 66.5 59.6 25.0 78.9 79.7 82.6 83.5 8.35 84.3
Mag Conc. 4.1 1.4 0.73 1.57 54.0 24.1 3.55 0.68 0.37 1.96 5.68 2.87 1.14 1.65 1.05 2.15 22.4 13.7 4.30 0.74 3.00 21.7 5.66
Fines (calc.) 288 100 0.63 1.36 73.5 16.0 0.23 0.07 0.12 3.77 2.70 0.19 0.29 100 100 100 100 100 100 100 100 100 100

 

Table 13-40 – Ultrafines fraction DMS stage results

 

Product Weight Assays (%) Distribution (%)
kg % Li Li2O SiO2 Al2O3 Fe2O3 MgO CaO Na2O K2O P2O5 MnO Li SiO2 Al2O3 Fe2O3 MgO CaO Na2O K2O P2O5 MnO
Concentrate 14.1 11.5 3.01 6.48 64.6 26.6 0.40 0.01 0.03 0.30 0.61 0.43 0.07 58.6 10.2 19.9 20.6 3.32 4.47 0.99 2.91 14.4 12.1
Middling 19.8 16.2 0.48 1.03 80.1 13.2 0.41 0.01 0.07 2.20 1.81 0.36 0.04 13.2 17.8 13.9 29.8 4.68 14.70 10.2 12.2 17.0 9.73
Tailings 84.1 68.5 0.20 0.43 76.5 13.6 0.06 0.04 0.09 4.52 2.97 0.32 0.02 23.3 72.0 60.9 18.5 79.3 80.1 88.8 84.7 64.1 20.6
Mag Conc. 4.8 3.9 0.73 1.58 1.02 20.78 1.77 0.11 0.01 0.03 0.15 0.39 0.98 4.86 0.05 5.30 31.1 12.7 0.71 0.04 0.24 4.48 57.6
Ultrafines (calc.) 123 100 0.59 1.26 72.8 15.3 0.22 0.03 0.08 3.49 2.40 0.34 0.07 100 100 100 100 100 100 100 100 100 100

 

21501-REP-PM-001
Page | 169

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 13-41 and Table 13-42 show the overall and combined DMS mass balances for the composite sample. The combined concentrate graded 6.11% Li2O and 0.35% Fe2O3, with a global lithium recovery of 50.8%. Dry magnetic separation prior to the DMS test work was mainly used to reject mica. A slightly higher lithium distribution was observed in the fines fraction (26.5%) as compared to 14.1% for the coarse and 10.2% for the ultrafines fraction, which was largely associated with the higher mass of the fines fraction.

 

Roughly 15% of the lithium reported to the middling (2nd Pass DMS floats) which graded 1.4% Li2O. In order to maximize the overall lithium recovery, the coarse and fines middlings were combined, re-crushed and processed by HLS. The material was screened at 3.3 mm. The coarse fraction was stage-crushed to -3.3 mm. All the material was then screened at 0.5 mm. A sub-sample of the -3.3 mm / +0.5 mm fraction was submitted for a single pass HLS test at SG 2.90. The -0.5 mm material was subsampled and assayed. The results of the re-crushed HLS test were incorporated into the DMS mass balance (Table 13-43).

 

At an SG cut-point of 2.90, the HLS test produced a spodumene concentrate grading 5.61% Li2O recovering an additional 3.4% lithium. The combined DMS and re-crushed concentrate graded 6.08% Li2O and the global combined lithium recovery increased from 51.1% to 54.4% with re-crushing (stage recovery of 63.8%).

 

21501-REP-PM-001
Page | 170

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 13-41 – Global DMS results by size fraction

 

  Product Weight Assays (%) Distribution (%)
  kg % Li Li2O SiO2 Al2O3 Fe2O3 MgO CaO Na2O K2O P2O5 MnO Li SiO2 Al2O3 Fe2O3 MgO CaO Na2O K2O P2O5 MnO
Coarse DMS Conc. 22.0 3.30 2.66 5.72 67.3 24.1 0.34 0.01 0.04 0.73 0.38 0.28 0.09 14.1 3.04 4.95 4.03 0.57 1.19 0.63 0.48 2.67 1.73
DMS Middling 50.5 7.56 0.44 0.95 77.1 14.3 0.44 0.02 0.10 4.04 1.43 0.55 0.11 5.35 8.00 6.74 12.0 2.62 6.85 7.96 4.18 12.0 4.85
DMS Tailings 75.0 11.2 0.25 0.54 71.5 15.8 0.11 0.05 0.09 4.84 4.12 0.45 0.03 4.52 11.0 11.1 4.44 9.74 9.16 14.2 17.9 14.6 1.97
Mag Con 1.65 0.25 0.52 1.12 77.7 14.5 0.38 0.02 0.06 2.91 1.64 0.49 0.08 0.21 0.26 0.22 0.34 0.09 0.13 0.19 0.16 0.35 0.12
Fines DMS Conc. 38.1 5.71 2.88 6.20 66.5 25.0 0.34 0.01 0.06 0.49 0.35 0.28 0.10 26.5 5.21 8.89 6.97 0.99 3.10 0.73 0.77 4.63 3.33
DMS Middling 55.8 8.4 0.52 1.12 77.7 14.5 0.38 0.02 0.06 2.91 1.64 0.49 0.08 7.00 8.91 7.56 11.4 2.90 4.54 6.34 5.31 11.9 3.90
DMS Tailings 190 28.4 0.21 0.45 74.1 14.4 0.09 0.08 0.15 4.72 3.42 0.02 0.37 9.59 28.9 25.6 8.74 41.6 38.2 35.0 37.6 1.97 60.9
Mag Con 4.10 0.61 0.73 1.57 54.0 24.1 3.55 0.68 0.37 1.96 5.68 2.87 1.14 0.72 0.46 0.92 7.84 7.24 2.06 0.31 1.35 5.11 4.09
Ultrafines DMS Conc. 14.1 2.11 3.01 6.48 64.6 26.6 0.40 0.01 0.03 0.30 0.61 0.43 0.07 10.2 1.87 3.49 3.03 0.37 0.57 0.16 0.50 2.62 0.86
DMS Middling 19.8 2.97 0.48 1.03 80.1 13.2 0.41 0.01 0.07 2.20 1.81 0.36 0.04 2.30 3.27 2.45 4.38 0.52 1.88 1.71 2.08 3.10 0.69
DMS Tailings 84.1 12.6 0.20 0.43 76.5 13.6 0.06 0.04 0.09 4.52 2.97 0.32 0.02 4.06 13.2 10.7 2.72 8.74 10.27 14.9 14.5 11.7 1.47
Mag Con 4.79 0.72 0.73 1.58 1.0 20.8 1.8 0.11 0.01 0.03 0.15 0.4 0.98 0.85 0.01 0.93 4.56 1.39 0.09 0.01 0.04 0.82 4.11
  Hypofines 108 16.2 0.56 1.21 71.3 16.4 0.51 0.08 0.15 4.26 2.42 0.61 0.13 14.6 15.8 16.5 29.6 23.2 21.9 18.0 15.1 28.5 12.0
  Head (calc.) 668 100 0.62 1.34 72.9 16.0 0.28 0.06 0.11 3.83 2.58 0.35 0.17 100 100 100 100 100 100 100 100 100 100
  Head (direct)     0.69 1.48 73.7 16.3 0.26 0.03 0.08 3.75 2.64 0.48 0.08                    

 

Table 13-42 – Global combined DMS results

 

Product Weight Assays (%) Distribution (%)
kg % Li Li2O SiO2 Al2O3 Fe2O3 MgO CaO Na2O K2O P2O5 MnO Li SiO2 Al2O3 Fe2O3 MgO CaO Na2O K2O P2O5 MnO
DMS Conc. 74.2 11.1 2.84 6.11 66.4 25.0 0.35 0.01 0.05 0.53 0.41 0.31 0.09 50.8 10.1 17.3 14.0 1.93 4.87 1.52 1.76 9.93 5.92
DMS Middlings 126 18.9 0.48 1.04 77.8 14.2 0.41 0.02 0.08 3.25 1.58 0.49 0.09 14.6 20.2 16.7 27.7 6.04 13.3 16.0 11.6 27.0 9.45
DMS Tailings 349 52.3 0.22 0.46 74.1 14.5 0.08 0.07 0.12 4.70 3.46 0.19 0.21 18.2 53.2 47.3 15.9 60.1 57.6 64.0 70.0 28.3 64.3
Mag Con 10.5 1.58 0.70 1.50 33.6 21.1 2.24 0.32 0.16 1.23 2.53 1.37 0.90 1.77 0.73 2.08 12.7 8.72 2.28 0.51 1.55 6.27 8.31
Hypofines 108 16.2 0.56 1.21 71.3 16.4 0.51 0.08 0.15 4.26 2.42 0.61 0.13 14.6 15.8 16.5 29.6 23.2 21.9 18.0 15.1 28.5 12.0
Head (calc.) 668 100 0.62 1.34 72.9 16.0 0.28 0.06 0.11 3.83 2.58 0.35 0.17 100 100 100 100 100 100 100 100 100 100
Head(direct)     0.69 1.48 73.7 16.3 0.26 0.03 0.08 3.75 2.64 0.48 0.08                    

 

Table 13-43 – Global combined DMS results with middlings re-crush

 

Product Weight Assays (%) Distribution (%)
kg % Li Li2O SiO2 Al2O3 Fe2O3 MgO CaO Na2O K2O P2O5 MnO Li SiO2 Al2O3 Fe2O3 MgO CaO Na2O

K2O

 

P2O5 MnO
DMS Concentrate 74.2 11.1 2.84 6.11 66.4 25.04 0.35 0.01 0.05 0.53 0.41 0.31 0.09 51.0 10.2 17.3 13.8 1.85 4.30 1.53 1.75 10.1 6.07
Expected DMS Re-crush Conc. 5.42 0.81 2.61 5.61 63.7 25.2 0.85 0.04 0.15 0.59 0.33 1.12 0.19 3.42 0.71 1.28 2.44 0.54 0.97 0.13 0.10 2.68 0.92
Expected DMS Re-crush Tail 84.0 12.6 0.33 0.72 77.5 14.1 0.43 0.03 0.07 3.34 1.74 0.43 0.05 6.80 13.4 11.0 19.2 6.40 7.10 11.04 8.44 15.8 3.99
DMS Midllings 19.8 2.97 0.48 1.03 80.1 13.2 0.41 0.01 0.07 2.20 1.81 0.36 0.04 2.30 3.29 2.45 4.30 0.49 1.66 1.72 2.07 3.16 0.71
DMS Tailings 349 52.3 0.22 0.46 74.1 14.5 0.08 0.07 0.12 4.70 3.46 0.19 0.21 18.2 53.5 47.3 15.6 57.7 50.9 64.5 69.7 28.8 65.9
Mag Con 10.5 1.58 0.70 1.50 33.6 21.1 2.24 0.32 0.16 1.23 2.53 1.37 0.90 1.78 0.73 2.08 12.5 8.37 2.02 0.51 1.54 6.39 8.51
Re-crush Undersize 13.7 2.05 0.46 0.99 75.8 15.2 0.42 0.05 0.15 4.13 1.55 0.65 0.13 1.52 2.14 1.94 3.03 1.70 2.46 2.22 1.22 3.93 1.59
Re-crush Undersize 3.04 0.46 0.41 0.88 15.7 0.8 0.03 0.09 3.08 2.26 0.46 0.07 0.02 0.30 0.10 0.02 0.05 0.68 11.2 0.27 0.08 0.09 0.05
Hypofines 108 16.2 0.56 1.21 71.3 16.4 0.51 0.08 0.15 4.26 2.42 0.61 0.13 14.7 15.9 16.5 29.0 22.3 19.4 18.1 15.0 29.0 12.3
Head (calc.) 667 100 0.62 1.33 72.5 16.0 0.28 0.06 0.13 3.81 2.59 0.34 0.17 100 100 100 100 100 100 100 100 100 100
Head (direct)     0.62 1.34 72.9 16.0 0.28 0.06 0.11 3.83 2.58 0.35 0.17                    
DMS and Re-crush Conc. 79.6 11.9 2.82 6.08 66.2 25.0 0.39 0.01 0.06 0.53 0.40 0.36 0.10 54.4 10.9 18.6 16.2 2.39 5.27 1.66 1.85 12.8 6.99

 

21501-REP-PM-001
Page | 171

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 13-44 gives a summary of the final concentrate grades and recoveries for the DMS test work.

 

Table 13-44 – Summary of DMS concentrate grade and recovery

 

Stream Grade,
% Li2O
Stage
Recovery,
%

Coarse Fraction

Fines Fraction

Ultrafines Fraction

5.72

6.20

6.48

58.1

60.5

58.6

Combined Without Re-crush

Combined With Re-crush

6.11

6.08

59.5

63.8

 

The DMS concentrate was analyzed using XRD to determine semi-quantitative mineralogy. The results are presented in Table 13-45. The primary lithium-bearing mineral in the DMS concentrate was spodumene with minor amounts of cookeite and ferrisicklerite.

 

Table 13-45 – DMS concentrate semi-quantitative XRD analysis

 

Mineral Composition,
%

Spodumene

Quartz

Albite

Muscovite

Cookeite

Ferrisicklerite

Magnetite

74.8

14.4

4.5

3.6

2.2

0.3

0.2

 

13.3.6Barreiro recovery and basis of assumptions

 

The Barreiro plant mass balance was produced based on stage recoveries achieved during pilot-scale DMS operation on the composite sample:

 

oCoarse fraction stage lithium recovery of 58.1%
oFines fraction stage lithium recovery of 60.5%
oUltrafines fraction stage lithium recovery of 58.6%

 

Mass reporting to the hypofines fraction was 16% with associated lithium loss of 13.8%.

 

Barreiro plant design is based on producing a target 6.0% Li2O spodumene concentrate with global lithium recovery of 50.9%.

 

21501-REP-PM-001
Page | 172

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

13.3.7Impact of Lower Recovery Grade on Recovery

  

The project has 5 samples on which HLS test work was done:

 

4 variability samples
1 composite samples

 

This set of data was then used in the calculations to determine the impact of decreasing the product grade from 6% to 5.5% on Li2O recovery and yield. Both Li2O recovery and product yield calculations are on a global basis i.e., relative to the fresh feed inclusive of the fines. It has been assumed that the fines do not contribute to the product and have been assigned a zero yield.

 

Table 13- shows the summary of global recovery and yield between 6% and 5.5% Li2O product grade.

 

Table 13-46: Barreiro Global Recovery and Yield between 6% and 5.5% Li2O Product Grade

 

    6.0% Li2O 5.5 % Li2O Relative (5.5% vs 6.0%)
Size ID Yield Li2O
Recovery
Yield Li2O
Recovery
Yield Li2O Recovery
9.5 Var 1 11.22 49.18 12.7 51.02 1.04 1.13
9.5 Var 2 22.86 68.96 26 71.89 1.04 1.14
9.5 Var 3 12.35 56.92 14.05 59.33 1.04 1.14
9.5 Var 4 8.56 54.19 9.76 56.66 1.05 1.14
9.5 Comp 13.5 57.29 15.67 60.98 1.06 1.16
Overall Median Value           1.04 1.14
Overall Relative Increase (%)           4.26 13.74

 

Given the narrow relative recovery range between the 6 samples the median of the data set was used. The global recovery at 6% is assumed to be 50.9%, using this relative increase the recovery at 5.5% is assumed to be 57.9%.

 

21501-REP-PM-001
Page | 173

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

14MINERAL RESOURCE ESTIMATES

 

The Mineral Resource estimates are reported using the 2014 CIM Definition Standards and the 2019 CIM Guidelines. The mineral resource estimation work for the Project was conducted by Mr. Marc-Antoine Laporte, M.Sc., P.Geo. The 3D modelling, geostatistics, and grade interpolation of the block model was conducted using the Genesis© software developed by SGS. The Mineral Resource estimation process was reviewed internally by Maxime Dupere, P.Geo, from SGS. Due to the distances between the Xuxa, Barreiro, Lavra do Meio, Murial and Nezinho do Chicao pegmatites, they are treated as separate estimates and separate block models were constructed for each zone. The Xuxa, Murial and Lavra do Meio resources and sections have not been updated since the 2019 technical report, while the Barreiro deposit was updated in 2022.

 

The Mineral Resource estimates are based on the drill hole database (lithology logs and assays) using HQ drill core and are limited by the topographic surface. Due to the lack of control on the channel sampling from the previous exploration campaigns, the channel assay results were not used for purposes of resource estimation and mapping was used only to control the pegmatite wireframe.

 

14.1Nezinho do Chicao Deposit

 

14.1.1Exploratory Data Analysis

 

The final database used for the Nezinho do Chicao (NDC) pegmatite Mineral Resource estimation was transmitted to SGS by SMSA on the 21st April 2022 in Microsoft® Excel format and this date was used as a cut-off for the resource estimate. The database validation steps are discussed in Section 12. The database comprised 110 drill holes, although assay data was only available for 103 of those holes. The remaining hole where only used for for the wireframe model. The database entries comprise:

 

Drill hole collars (n=110)

 

Down hole surveys (n = 5,998)

 

Assays (n = 3,747)

 

Lithologies (n = 2,085).

 

The database was validated upon importation in Genesis©, which enabled the correction of minor discrepancies between the table entries, surveys, and lithologies.

 

Vertical sections were generated oriented at an azimuth of 25° following the drilling pattern and perpendicular to the general trend of the pegmatite unit. In general, the sections are spaced at 100 m intervals, with drill holes spaced at approximately 50 m intervals on each section. Figure 14-1 shows the drill collar layout plan.

 

The topographic surface that was used by SGS was a 1 m precision DEM (refer to Section 9.2).

 

21501-REP-PM-001
Page | 174

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

  

 

 

Figure 14-1: NDC Drill Hole Collar Locations

 

14.1.2Analytical Data

 

There is a total of 3,747 assay intervals in the database that were used for Mineral Resource estimation; 1,920 assays are contained inside the interpreted mineralized solids. Most of the drill holes defining the mineralized solids have been sampled continuously. Table 14-1 shows the range of Li2O values from the analytical data within the interpreted mineralized shapes.

 

Table 14-1: NDC Assay Statistics Inside Mineralized Solids

 

  Li2O
(%)
Count 2,279
Mean 1.48
Std. Dev. 0.85
Min 0.02
Median 1.44
Max 5.79

 

14.1.3Composite Data

 

Block model grade interpolation was conducted on composited analytical data. A 1 m composite length was selected based on the 5 m by 3 m by 5 m block size defined for the resource block model. Compositing began at the bedrock-overburden contact. No capping was applied on the analytical composite data.

 

Composite lengths ranged from 0.67 m to 1.14 m, with an average length of 0.997 m. The grade ranged from 0.0% Li2O to 4.72% Li2O, with an average grade of 1.44% Li2O.

 

21501-REP-PM-001
Page | 175

 

  

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 14-2 shows the grade statistics of the analytical composites used for the interpolation of the resource block model.

 

Table 14-2: NDC 1 m Composite Statistics

 

  Li2O
(%)
Count 1,920
Mean 1.44
Std. Dev. 0.74
Min 0.00
Median 1.45
Max 4.72

 

14.1.4Density

 

Density determinations are outlined in Section 11.3. An average density value of 2.7 t/m3 was determined for the mineralized pegmatite. This value was used for the calculation of the tonnages from the volumetric estimates of the resource block model.

 

14.1.5Geological Interpretation

 

SGS conducted the interpretation of the 3D wireframe solids of the mineralization based on the drill hole data and surface mapping done by SMSA geologists. For the purpose of modelling, sections (looking northeast) were generated every 50 m, with intermediate sections where necessary to tie in the solids. The modelling was first completed on sections to define mineralized shapes using the lithology and lithium analytical data. A minimum grade of 0.3% Li2O over a minimum drill hole interval length of 1.5 m was generally used as guideline to define the width of mineralized shapes (refer to Figure 7-4). The final 3D wireframe model (solid) was constructed by linking the defined mineralized shapes based on the geological interpretation.

 

The linked interpretation shows two pegmatite bodies, with a strike orientation of 018º azimuth and a dip averaging -50º to the northeast. The pegmatite body was modelled as two envelopes separated by an 80 m wide zone with no significant lithium mineralization indicated in drilling.

 

The mineralized solids were clipped directly on the DEM surface. Figure 14-3 shows the final 3D wireframe solids in isometric view with the drill holes pierce points.

 

21501-REP-PM-001
Page | 176

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

  

 

Figure 14-2: NDC Pegmatite Solid (looking west-northwest)

 

14.1.6Resource Block Modeling

 

A block size of 5 m by 3 m by 5 m (vertical) was selected for the NDC resource block model based on the drill hole spacing and the width and general geometry of mineralization. No rotation was applied to the block model. The 5 m vertical dimension corresponds to the bench height of a potential small open pit mining operation. The 5 m northeast–southwest dimension corresponds to about 5% of the minimum drill spacing and accounts for the variable geometry of the mineralization in that direction.

 

The 3 m northwest–southeast block dimension accounts for the minimum width of the mineralization modelled at NDC. The resource block model contains 182,973 blocks located inside (> 1%) the mineralized solids, for a total volume of 10,004,364 m3. Table 14-3 summarizes the block model limit parameters.

 

Table 14-3: NDC Resource Block Model Parameters

 

Direction Block Size
(m)
Number of
Blocks
Coordinates
(Local Grid) Min
(m)
Coordinates
(Local Grid) Max
(m)
East–west (x) 5 151 191,350 192,100
North–south (y) 3 535 8,139,300 8,140,902
Elevation (z) 5 96 -100 375

 

14.1.7Variography

 

In order to determine the continuity and distribution of the Li2O grades, the 1 m composites were submitted to a variographic study. The variographic analysis helped determine the search ellipses criteria and define the kriging parameters for the block interpolation process.

 

The data was plotted as a correlogram, which normalises the data to a sill value of 1.0.

 

21501-REP-PM-001
Page | 177

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

The resulting correlogram is shown as Figure 14-3.

 

 

Figure 14-3: NDC Combined Correlogram

 

14.1.8Block Model Interpolation

 

The grade interpolation for the NDC resource block model was completed using ordinary kriging (OK). The interpolation process was conducted using three successive passes with more inclusive search conditions from the first pass to the next until most blocks were interpolated.

 

Variable search ellipse orientations were used to interpolate the blocks. The general dip of the mineralized pegmatite was modelled on each section and then interpolated in each block. During the interpolation process, the search ellipse was orientated based on the interpolation direction of each block, hence better representing the local dip and orientation of the mineralization.

 

The first pass was interpolated using a search ellipsoid distance of 75 m (long axis) by 75 m (intermediate axis) and 25 m (short axis) with an orientation of 018º azimuth and -50º dip which represents the general geometry of the pegmatite in the NDC deposit. For the second pass, the search distance was twice the search distance of the first pass and composites selection criteria were kept the same as for the first pass. Finally, the search distance of the third pass was increased to 300 m (long axis) by 300 m (intermediate axis) by 100 m (short axis). The purpose of the last interpolation pass was to interpolate the remaining un-estimated blocks mostly located at the edges of the block mode.

 

Figure 14-5 illustrates the three search ellipsoids used for the different interpolation passes.

 

Figure 14-6 shows the results of the block model interpolation in longitudinal view.

 

21501-REP-PM-001
Page | 178

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 14-4: Isometric View of NDC Search Ellipsoids

 

 

Figure 14-5: Isometric View of the NDC Interpolated Block Model

 

14.1.9Model Validation

 

To validate the interpolation process, the block model grades were compared statistically to the assay and composite grades. The distribution of the assays, composites and blocks are normal (gaussian) and show similar average values with decreasing levels of variance (Figure 14-6). The assays and composites have average values of 0.98 and 1.44% Li2O with variances of 0.87 and 0.55% Li2O respectively. The interpolated blocks have an average value of 1.46% Li2O with a variance of 0.09% Li2O.

 

21501-REP-PM-001
Page | 179

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Chart, histogram

Description automatically generated

 

Figure 14-6: Statistical Comparison of NDC Assay, Composite and Block Data

 

Furthermore, the block values were compared to the composite values located inside the interpolated blocks. This enables a test for possible over- or under-estimation of the grade by the search parameters by testing the correlation between the two values. A correlation of determination of 0.38 (R2) was established between the blocks and the composites (Figure 14-7). This confirms what can be seen in Figure 14-7, namely that the block model is smoothed in relation to the composites. It is the opinion of the QP that this level of smoothing is acceptable for this type of deposit.

 

21501-REP-PM-001
Page | 180

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

  

 

Figure 14-7: Comparison NDC Block Values Versus Composites Inside Blocks

 

14.1.10Mineral Resource Classification

 

Mineral Resources are classified into Measured, Indicated and Inferred categories. The Mineral Resource classification is based on the density of analytical information, the grade variability and spatial continuity of mineralization. The Mineral Resources were classified in two successive stages: automated classification, followed by manual editing of final classification results.

 

The first classification stage was conducted by applying an automated classification process which selects around each block a minimum number of composites from a minimum number of holes located within a search ellipsoid of a given size and orientation:

 

Measured Mineral Resources: the search ellipsoid used was 50 m (strike) by 50 m (dip) by 25 m with a minimum of seven composites in at least three different drill holes
Indicated Mineral Resources: the search ellipsoid was twice the size of the Measured category ellipsoid using the same composites selection criteria
Inferred Mineral Resources: all remaining blocks.

 

Figure 14-8 is a plan view showing the final classifications.

21501-REP-PM-001
Page | 181

 

  

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Chart, surface chart

Description automatically generated

 

Figure 14-8: NDC Block Model Classification

 

14.1.11Reasonable Prospects of Eventual Economic Extraction

 

The general requirement that all mineral resources have “reasonable prospects for eventual economic extraction” implies that the quantity and grade estimates meet certain economic thresholds and that the mineral resources are reported at an appropriate cut-off grade taking into account extraction scenarios and processing recoveries. In order to meet this requirement, the lithium mineralization of the NDC deposit is considered amenable to open pit extraction.

 

To determine the quantity of material representing “reasonable prospects for eventual economic extraction” by an open pit mining method, Whittle™ pit optimization software was used with reasonable mining and economic assumptions. The pit optimization for the NDC deposit was completed by SGS for the current MRE. The pit optimization parameters used are summarized in Table 14-4. A conservative and balanced approach was applied when optimizing the open pit scenario. A Whittle pit shell at a revenue factor of 1.0 ($1,500/t concentrate price) was selected as the ultimate pit shell for the purposes of the MRE for the NDC deposit.

 

The reader is cautioned that the results from the pit optimization are used solely for the purpose of testing the “reasonable prospects for economic extraction” by an open pit and do not represent an attempt to estimate mineral reserves. The results are used as a guide to assist in the preparation of a mineral resource statement and to select an appropriate resource reporting cut-off grade.

 

21501-REP-PM-001
Page | 182

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 14-4: NDC Pit Optimization Parameters

 

Parameter Unit Value
Concentrate Price (6% Li2O) US$ per tonne $1,500
Pit Slope Degrees 60
Mining Cost US$ per tonne mined $2.20
Processing Cost (incl. crushing) US$ per tonne milled $10.7
General and Administrative US$ tonne of feed $4
Mining Recovery Percent (%) 95
Concentration Recovery (DMS) Percent (%) 60
Pit Slopes Fresh Rock Degrees 52-55
Royalties Percent (%) 2
Mining loss / Dilution Percent (%) / Percent (%) 5 / 5
Cut-off Grade Percent (%) Li2O 0.5

 

Figure 14-9 shows a view of the optimized NDC pit together with the NDC block model.

 

 

Figure 14-9: NDC Deposit Mineral Resource Block Grades and Revenue Factor 1 Pit

 

14.1.12Mineral Resource Statement

 

The Mineral Resource estimate is reported in Table 14-5 using a 0.5% Li2O cut-off. The Mineral Resources are constrained by the topography and based on the conceptual economic parameters detailed in Table 14-5. The estimate has an effective date of May 30, 2022. The QP for the estimate is Mr. Marc-Antoine Laporte, P.Geo., an SGS employee.

 

21501-REP-PM-001
Page | 183

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 14-5: NDC Deposit Mineral Resource Estimate

 

Cut-off Grade
Li2O (%)
Category Tonnes
(Mt)
Average
Grade Li2O
(%)
Contained
LCE (Kt)
0.5 Measured 2.4 1.55 92
0.5 Indicated 20.9 1.48 765
0.5 Measured + Indicated 23.3 1.49 857
0.5 Inferred 3.5 1.48 129

 

Notes to accompany Mineral Resource table:

 

8.Mineral Resources have an effective date of May 30, 2022 and have been classified using the 2014 CIM Definition Standards. The Qualified Person for the estimate is Mr Marc-Antoine Laporte, P.Geo., an SGS employee.
9.All Resources are presented undiluted and in situ, constrained by continuous 3D wireframe models, and are considered to have reasonable prospects for eventual economic extraction.
10.Mineral Resources are reported assuming open pit mining methods, and the following assumptions: lithium concentrate (6% Li2O) price of US$1,500/t, mining costs of US$2.2/t for mineralization and waste, crushing and processing costs of US$10/t, general and administrative (G&A) costs of US$4/t, concentrate recovery of 60%, 2% royalty payment, pit slope angles of 52-55º, and an overall cut-off grade of 0.5% Li2O.
11.Tonnages and grades have been rounded in accordance with reporting guidelines. Totals may not sum due to rounding.
12.Mineral resources which are not mineral reserves do not have demonstrated economic viability. An Inferred Mineral Resource has a lower level of confidence than that applying to a Measured and Indicated Mineral Resource and must not be converted to a Mineral Reserve. It is reasonably expected that the majority of Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration.
13.The results from the pit optimization are used solely for the purpose of testing the “reasonable prospects for economic extraction” by an open pit and do not represent an attempt to estimate mineral reserves. There are no mineral reserves on the Property. The results are used as a guide to assist in the preparation of a Mineral Resource statement and to select an appropriate resource reporting cut-off grade.
14.The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues.

 

Factors that can affect Mineral Resource estimates include but are not limited to:

 

Changes to the modelling method or approach
Changes to geotechnical assumptions, in particular, the pit slope angles
Metallurgical recovery assumption that are based on preliminary test results
Changes to any of the social, political, economic, permitting, and environmental assumptions considered when evaluating reasonable prospects for eventual economic extraction
Mineral Resource estimates can also be affected by the market value of lithium and lithium compounds.

 

14.2Xuxa Deposit

 

14.2.1Exploratory Data Analysis

 

The final database used for the Xuxa pegmatite Mineral Resource estimation was transmitted to SGS by SMSA on December 13, 2018 in Microsoft® Excel format and Datamine format and this date was used as a cut-off for the resource estimate. The database validation steps are discussed in Section 12. The database comprises 93 drill holes with entries for:

 

Down hole surveys (n = 4,680)
Assays (n = 2,386)
Lithologies (n = 1,180).

 

The database was validated upon importation in Genesis©, which enabled the correction of minor discrepancies between the table entries, surveys, and lithologies.

 

21501-REP-PM-001
Page | 184

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Vertical sections were generated oriented N55°W (305º azimuth) following the drilling pattern and perpendicular to the general trend of the pegmatite unit. In general, the sections are spaced at 50 m intervals. Figure 14-10 is a drill collar layout plan.

 

The topographic surface that was used by SGS was a 1 m precision DEM (refer to Section 9.2).

 

 

Figure 14-10 – Xuxa Drill Hole Collar Locations

 

(2017 collars shown in blue and 2018 collars shown in black)

 

Note: North is to top of figure.

 

14.2.2Analytical Data

 

There is a total of 2,386 assay intervals in the database that were used for Mineral Resource estimation; 1,247 assays are contained inside the interpreted mineralized solids. Most of the drill holes defining the mineralized solids have been sampled continuously. Table 14-6 shows the range of Li2O values from the analytical data within the interpreted mineralized shapes.

 

Table 14-6 – Xuxa Assay Statistics Inside Mineralized Solids

 

  Li2O
(%)
Count 1,247
Mean 1.48
Std. Dev. 0.84
Min 0.03
Median 1.51
Max 4.63

 

21501-REP-PM-001
Page | 185

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

14.2.3Composite Data

 

Block model grade interpolation was conducted on composited analytical data. A 1 m composite length was selected based on the north–south width of the 5 m by 3 m by 5 m block size defined for the resource block model. Compositing began at the bedrock-overburden contact. No capping was applied on the analytical composite data.

 

Table 14-7 shows the grade statistics of the analytical composites used for the interpolation of the resource block model and Figure 14-11 is an example histogram.

 

Table 14-7 – Xuxa 1 m Composite Statistics

 

  Li2O
(%)
Count 1,096
Mean 1.56
Std. Dev. 0.70
Min 0.13
Median 1.58
Max 3.94

 

 

Figure 14-11 – Xuxa 1 m Composite Histogram

 

14.2.4Density

 

Density determinations are outlined in Section 11.3. An average density value of 2.7 t/m3 was determined for the mineralized pegmatite. This value was used for the calculation of the tonnages from the volumetric estimates of the resource block model.

 

21501-REP-PM-001
Page | 186

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

14.2.5Geological Interpretation

 

SGS conducted the interpretation of the 3D wireframe solids of the mineralization based on the drill hole data and surface mapping done by SMSA geologists. For the purpose of modelling, sections (looking northeast) were generated every 50 m, with intermediate sections where necessary to tie in the solids. The modelling was first completed on sections to define mineralized shapes using the lithology and lithium analytical data. A minimum grade of 0.3% Li2O over a minimum drill hole interval length of 1.5 m was generally used as guideline to define the width of mineralized shapes (refer to Figure 7-4). The final 3D wireframe model (solid) was constructed by linking the defined mineralized shapes based on the geological interpretation.

 

The linked interpretation shows one pegmatite body, with a strike orientation of 075º azimuth and a dip averaging -50º to the northwest. The pegmatite body was modelled as one envelope with two principal zones on the east and west side of the Piaui Corrego creek that are linked by a thinner zone extrapolated below the river level. A fault following the Piaui river possibly partially split the pegmatite and induced a slight sinistral displacement between the east and west zones. Additional drilling should be conducted to quantify the fault location and impact on the pegmatite location.

 

The mineralized solids were clipped directly on the DEM surface and the average depth of soil overburden is 2.9 m. Between the soil and the rock there is a semi consolidated saprolite that is quite variable in thickness from 1 to 17 m. Figure 14-12 shows the final 3D wireframe solids in isometric view with the drill holes pierce points.

 

 

Figure 14-12 – Xuxa Pegmatite Solid (looking southeast)

 

14.2.6Resource Block Modeling

 

A block size of 5 m by 3 m by 5 m (vertical) was selected for the Xuxa resource block model based on the drill hole spacing and the width and general geometry of mineralization. No rotation was applied to the block model. The 5 m vertical dimension corresponds to the bench height of a potential small open pit mining operation. The 5 m northeast–southwest dimension corresponds to about a tenth of the minimum drill spacing and accounts for the variable geometry of the mineralization in that direction.

 

21501-REP-PM-001
Page | 187

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

The 3 m northwest–southeast block dimension accounts for the minimum width of the mineralization modelled at Xuxa. The resource block model contains 156,706 blocks located inside (> 1%) the mineralized solids, for a total volume of 7,872,275 m3. Table 14-8 summarizes the block model limit parameters.

 

Table 14-8 – Xuxa Resource Block Model Parameters

 

Direction Block
Size
(
m)
Number of
Blocks
Coordinates
(Local Grid) Min
(
m)
Coordinates
(Local Grid) Max
(
m)
East–west (x) 5 249 189,710 190,950
North–south (y) 3 420 8,145,922 8,147,176
Elevation (z) 5 71 50 350

 

14.2.7Variography

 

In order to determine the continuity and distribution of the Li2O grades, the 1 m composites were submitted to a variographic study. The variographic analysis helped determine the search ellipses criteria and define the kriging parameters for the block interpolation process.

 

The composites show a normal distribution with a relatively high standard deviation of 0.70 Li2O%. This prevented the use of a single correlogram model. Instead, two were generated, one for short distances and one for long distances. The short-distance correlogram was computed on untransformed composites. The long-distance correlogram was computed on transformed composites. The transformations involved projection of the composites and rescaling of the Z axis. This was to ensure a constant planar area of composite that could be used to identify long distance thin structures in the mineralized zone. Multiple iterations of variographic analyses were conducted on the transformed composites, each involved different Z axis slicing. The resulting correlogram is shown in Figure 14-13.

 

 

Figure 14-13Xuxa Combined Correlogram

 

The transformation process is omnidirectional by nature, so no preferred orientation and dip were identified during the modelling process. However, projection and Z-axis rescaling were done according to the mineralization orientation of 315º azimuth and -50º dip. The long-distance model is therefore optimal in this preferred orientation.

 

21501-REP-PM-001
Page | 188

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

14.2.8Block Model Interpolation

 

The grade interpolation for the Xuxa resource block model was completed using ordinary kriging (OK). The interpolation process was conducted using three successive passes with more inclusive search conditions from the first pass to the next until most blocks were interpolated.

 

Variable search ellipse orientations were used to interpolate the blocks. The general dip of the mineralized pegmatite was modelled on each section and then interpolated in each block. During the interpolation process, the search ellipse was orientated based on the interpolation direction of each block, hence better representing the local dip and orientation of the mineralization.

 

The first pass was interpolated using a search ellipsoid distance of 75 m (long axis) by 75 m (intermediate axis) and 25 m (short axis) with an orientation of 075º azimuth and -50º dip which represents the general geometry of the pegmatite in the Xuxa deposit. Using search conditions defined by a minimum of seven composites, a maximum of 15 composites and a minimum of three drill holes, 35% of the blocks were estimated. For the second pass, the search distance was twice the search distance of the first pass and composites selection criteria were kept the same as for the first pass. A total of 88% of the blocks were interpolated following the second pass. Finally, the search distance of the third pass was increased to 300 m (long axis) by 300 m (intermediate axis) by 100 m (short axis) with a minimum of seven composites, a maximum of 25 composites and a minimum of three drill holes. The purpose of the last interpolation pass was to interpolate the remaining unestimated blocks mostly located at the edges of the block model, representing 12% of the blocks.

 

Internal dilution included in the interpolation process is estimated by the QP to be at 1% of the overall volume (78,900 m3). Internal dilution of 0.5% or 35,000 m3 can be calculated from the drill log information but their lateral extension can be variable due to the 50 m drill spacing therefore 1% is considered reasonable by the QP.

 

21501-REP-PM-001
Page | 189

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Figure 14-14 illustrates the three search ellipsoids used for the different interpolation passes.

 

Figure 14-15 shows the results of the block model interpolation in longitudinal view.

 

 

Figure 14-14 – Isometric View of Xuxa Search Ellipsoids

 

 

Figure 14-15 – Isometric View of the Xuxa Interpolated Block Model

 

14.2.9Model Validation

 

To validate the interpolation process, the block model grades were compared statistically to the assay and composite grades. The distribution of the assays, composites and blocks are normal (gaussian) and show similar average values with decreasing levels of variance (Figure 14-16). The assays and composites have average values of 1.48 and 1.56% Li2O with variances of 0.70 and 0.49% Li2O respectively. The interpolated blocks have an average value of 1.53% Li2O with a variance of 0.07% Li2O.

 

21501-REP-PM-001
Page | 190

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 14-16 – Statistical Comparison of Xuxa Assay, Composite and Block Data

 

Furthermore, the block values were compared to the composite values located inside the interpolated blocks. This enables a test for possible over- or under-estimation of the grade by the search parameters by testing the correlation between the two values. A correlation of determination of 0.55 (R2) was established between the blocks and the composites (Figure 14-17), which is lower than expected and represents a higher level of smoothing than expected, but it is still considered by the QP to be acceptable for this type of deposit.

 

 

Figure 14-17 – Comparison Xuxa Block Values Versus Composites Inside Blocks

 

14.2.10Mineral Resources Classification

 

Mineral Resources are classified into Measured, Indicated and Inferred categories. The Mineral Resource classification is based on the density of analytical information, the grade variability and spatial continuity of mineralization. The Mineral Resources were classified in two successive stages: automated classification, followed by manual editing of final classification results.

 

21501-REP-PM-001
Page | 191

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

The first classification stage was conducted by applying an automated classification process which selects around each block a minimum number of composites from a minimum number of holes located within a search ellipsoid of a given size and orientation:

 

Measured Mineral Resources: the search ellipsoid used was 50 m (strike) by 50 m (dip) by 25 m with a minimum of seven composites in at least three different drill holes

Indicated Mineral Resources: the search ellipsoid was twice the size of the Measured category ellipsoid using the same composites selection criteria

Inferred Mineral Resources: all remaining blocks.

 

Figure 14-18 is a plan view showing the final classifications. Because the upper section of the deposit is tested by only one drill hole, it was classified as Inferred, as was the lower section of the deposit.

 

 

Figure 14-18 – Xuxa Block Model Classification

 

14.2.11Reasonable Prospects of Eventual Economic Extraction

 

The conceptual economic parameters were used to assess reasonable prospects of eventual economic extraction. A series of economic parameters were estimated to represent the production cost and economic prospectivity of an open pit mining operation in Brazil. They are detailed in Table 14-9 and came either from SGS Canada or SMSA. These parameters are believed to be sufficient to include all block models in future open pit mine planning mostly due to the relatively low mining costs in Brazil.

 

21501-REP-PM-001
Page | 192

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 14-9 – Xuxa Parameters for Reasonable Prospects for Eventual Economic Extraction

 

Parameters Value Unit References
Sales Revenues      
Concentrate Price (6% Li2O) 1000.00 US$/t Sigma
Operating Costs      
Mining Mineralized Material 2.0 US$/t Sigma
Mining Overburden 1.2 US$/t Sigma
Mining Waste 2.0 US$/t Sigma
Crushing and Processing 12.0 US$/t Sigma
General and Administration 4.0 US$/t Sigma
Metallurgy and Royalties      
Concentration Recovery 85 % SGS Canada Inc
Royalties 2 % Sigma
Geotechnical Parameters      
Pit Slopes 55 Degrees SGS Canada Inc
Mineralized Material Density 2.70 t/m3 SGS Canada Inc
Waste Material Density 2.76 t/m3 SGS Canada Inc
Overburden 1.61 t/m3 SGS Canada Inc
Cut-Off Grade 0.5 %Li2O SGS Canada Inc

 

Note: Concentration recovery (flotation test) are based on preliminary results from SGS Lakefield laboratory and may change at the completion of the test. Overburden density was taken from the average value of saprolitic soil as defined by Tan (2003)

 

14.2.12Mineral Resource Statement

 

The Mineral Resource estimate is reported in Table 14-10 using a 0.5% Li2O cut-off. The Mineral Resources are constrained by the topography and based on the conceptual economic parameters detailed in Table 14-4. The estimate has an effective date of January 10, 2019. The QP for the estimate is Mr. Marc-Antoine Laporte, P.Geo., an SGS employee.

 

Table 14-10 – Xuxa Deposit Mineral Resource Estimate

 

Cut-off Grade
Li2O (%)
Category Tonnage
(t)
Average Grade
Li2O (%)
LCE (Kt)
0.5 Measured 10,193,000 1.59 400.8
0.5 Indicated 7,221,000 1.49 266.1
0.5 Measured + Indicated 17,414,000 1.55 666.9
0.5 Inferred 3,802,000 1.58 148.6

 

Notes to accompany Mineral Resource table:

 

1.Mineral Resources have an effective date of January 10, 2019, and have been classified using the 2014 CIM Definition Standards. The Qualified Person for the estimate is Mr. Marc-Antoine Laporte, P.Geo., an SGS employee.

2.Mineral Resources are reported assuming open pit mining methods, and the following assumptions: lithium concentrate (6% Li2O) price of US$1,000/t, mining costs of US$2/t for mineralization and waste, US$1.2/t for overburden, crushing and processing costs of US$12/t, general and administrative (G&A) costs of US$4/t, concentrate recovery of 85%, 2% royalty payment, pit slope angles of 55º, and an overall cut-off grade of 0.5% Li2O.

3.Tonnages and grades have been rounded in accordance with reporting guidelines. Totals may not sum due to rounding.

4.Mineral Resources are reported inclusive of those Mineral Resources converted to Mineral Reserves. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

 

21501-REP-PM-001
Page | 193

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Factors that can affect Mineral Resource estimates include but are not limited to:

 

Changes to the modelling method or approach

Changes to geotechnical assumptions, in particular, the pit slope angles

Metallurgical recovery assumptions that are based on DFS test results

Changes to any of the social, political, economic, permitting, and environmental assumptions considered when evaluating reasonable prospects for eventual economic extraction

Internal schist dilution is estimated to 1% (78,900 m3) but can be variable depending of the lateral extension of the schist zone between the 50m drill spacing

Mineral Resource estimates can be affected by the market value of lithium and lithium compounds or the modification of the Brazilian taxation regime or environmental policies.

 

14.3Barreiro Deposit

 

14.3.1Exploratory Data Analysis

 

The final database used for the Barreiro pegmatite mineral resource estimation was transmitted to SGS by SMSA on January 22, 2022, in Microsoft® Excel format and Datamine format. The database validation steps are discussed in Section 12. The database comprises 128 drill holes with entries for:

 

Down hole surveys (n = 8,455)

Assays (n = 6,672)

Lithologies (n = 2,174)

 

The database was validated upon importation in Genesis©, which enabled the correction of minor discrepancies between the table entries, surveys, and lithologies.

 

Vertical sections were generated oriented northwest following the drilling pattern and the general trend of the pegmatite unit. In general, the sections are spaced at 50 m intervals. Figure 14-19 is a drill collar layout plan.

 

21501-REP-PM-001
Page | 194

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 14-19 – Barreiro Drillhole Collar Locations

 

Note: North is to top of figure.

 

21501-REP-PM-001
Page | 195

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

The topographic surface that was used by SGS was a 1 m precision DEM (refer to Section 9.2).

 

14.3.2Analytical Data

 

There is a total of 6,672 assay intervals in the database that were used for the Barreiro Mineral Resource estimate; 4,493 assays are contained inside the interpreted mineralized solids. Most of the drill holes defining the mineralized solids have been sampled continuously. Table 14-11 shows the range of Li2O values from the analytical data inside the mineralized solids.

 

Table 14-11 – Barreiro Assay Statistics Inside Mineralized Solids

 

  Li20
(%)
Count 4,493
Mean 1.40
Std. Dev. 1.04
Min 0.02
Median 1.27
Max 7.62

 

14.3.3Composite Data

 

Block model grade interpolation was conducted on composited analytical data. A 1 m composite length was selected based on the north–south width of the 5 m by 5 m by 5 m block size defined for the resource block model. Compositing starts at the bedrock-overburden contact. No capping was applied on the analytical composite data.

 

Table 14-12 shows the statistics of the analytical composites used for the interpolation of the resource block model. Figure 14-20 shows an example histogram.

 

Table 14-12 – Barreiro 1 m Composite Statistics

 

  Li20
(%)
Count 3,604
Mean 1.38
Std. Dev. 0.90
Min 0.03
Median 1.31
Max 6.07

 

21501-REP-PM-001
Page | 196

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 14-20 – Barreiro 1 m Composite Histogram

 

14.3.4Density

 

Density determinations are outlined in Section 11.3. An average density value of 2.72 t/m3 was determined for the mineralized pegmatite. This value was used for the calculation of the tonnages from the volumetric estimates of the resource block model.

 

14.3.5Geological Interpretation

 

SGS conducted the interpretation of the 3D wireframe solids of the mineralization based on the drill hole data and surface mapping done by SMSA geologists. For the purpose of modelling, sections (looking northeast) were generated every 50 m, with intermediate sections where necessary to tie in the solids. The modelling was first completed on sections to define mineralized shapes using the lithology and lithium analytical data. A minimum grade of 0.3% Li2O over a minimum drill hole interval length of 1.5 m was generally used as guideline to define the width of mineralized shapes. The final 3D wireframe model (solid) was constructed by linking the defined mineralized shapes based on the geological interpretation using a planar envelope model that uses an implicit modeling methodology.

 

The linked interpretation shows six pegmatite bodies, with a general orientation of azimuth 155° and a dip averaging -35° to the southeast. The pegmatite body was modelled with two main envelopes surrounded by four smaller pegmatite bodies above and below the main zone. The goal of the 2021 drilling program was to add more detail to the gap zone modeled in 2018 and to understand the fault system in Barreiro, if any. The results proved that the 2 main sections are linked and slightly folded on the center. No evidence of major faults was found in the drill core.

 

The mineralized solids were clipped directly on the DEM surface and the average depth of soil overburden is 3.15 m. Between the soil and the rock there is a semi-consolidated saprolite intersected in a few holes that is quite variable in thickness from 1 m to 3 m. Figure 14-21 shows the 3D wireframe solids of the Barreiro pegmatite in isometric view with the drill hole pierce points.

 

21501-REP-PM-001
Page | 197

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 14-21 – Sectional Interpretations of the Barreiro Pegmatite Unit (looking north and west)

 

14.3.6Resource Block Modelling

 

A block size of 5 m (northeast–southwest) by 5 m (northwest–southeast) by 5 m (vertical) was selected for the Barreiro resource block model based on drill hole spacing and width and general geometry of mineralization. No rotation is applied to the block model. The 5 m vertical dimension corresponds to the bench height of a potential small open pit mining operation. The 5 m northeast–southwest dimension corresponds to about a tenth of the minimum drill spacing and accounts for the variable geometry of the mineralization in that direction. The 5 m northwest–southeast block dimension accounts for the minimum width of the mineralization modelled at Barreiro. The resource block model contains 117,371 blocks located inside the mineralized solids, for a total volume of 10,100,000 m3. Table 14-13 summarizes the block model limit parameters.

 

Table 14-13 – Barreiro Resource Block Model Parameters

 

Direction Block
Size
(m)
Number of
Blocks
Coordinates
(Local Grid) Min
(m)
Coordinates
(Local Grid) Max
(m)
East–west (x) 5 219 190,356 191,446
North–south (y) 5 182 8,140,153 8,141,058
Elevation (z) 5 108 -143 392

 

14.3.7Variography

 

In order to determine the continuity and distribution of the Li2O grades, the 1 m composites were submitted to a variographic study. The variographic analysis helped determine the search ellipses criteria and define the kriging parameters for the block interpolation process.

 

The composites show a normal distribution with a relatively high standard deviation of 0.90 Li2O%. This prevented the use of a single correlogram model. Instead, two were generated, one for short distances and one for long distances. The short-distance correlogram was computed on untransformed composites. The long-distance correlogram was computed on transformed composites. The transformations involved projection of the composites and rescaling of the Z axis. This was to ensure a constant planar area of composite that could be used to identified long distance thin structure in the mineralized zone. Multiple iterations of variographic analyses were conducted on the transformed composites, each involved different Z axis slicing. The resulting correlogram is shown as Figure 14-22.

 

21501-REP-PM-001
Page | 198

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 14-22 – Barreiro Combined Correlogram

 

The transformation process is omnidirectional by nature, so no preferred orientation and dip were identified during the modelling process. However, projection and Z-axis rescaling were done according to the mineralization orientation of 317º of azimuth and -29º dip. The long-distance model is therefore optimal in this preferred orientation.

 

14.3.8Block Model Interpolation

 

The grade interpolation for the Barreiro resource block model was completed using OK. The interpolation process was conducted using three successive passes with more inclusive search conditions from the first pass to the next until most blocks were interpolated.

 

Variable search ellipse orientations were used to interpolate the blocks. The general dip of the mineralized pegmatite was modelled on each section and then interpolated in each block. During the interpolation process, the search ellipse was orientated following the interpolation direction of each block, hence better representing the dip and orientation of the mineralization.

 

The first pass was interpolated using a search ellipsoid distance of 50 m (long axis) by 50 m (intermediate axis) and 25 m (short axis) with an orientation of 317° azimuth, and -29° dip to the southeast which represents the general geometry of the pegmatites in the deposit. Using search conditions defined by a minimum of 11 composites, a maximum of 25 composites and a minimum of five holes, 62% of the blocks were estimated. For the second pass, the search distance was twice the search distance of the first pass and composites selection criteria were kept the same as for the first pass. A total of 95% of the blocks were interpolated following the second pass. Finally, the search distance of the third pass was increased to 250 m (long axis) by 250 m (intermediate axis) by 100 m (short axis) with a minimum of seven composites, a maximum of 25 composites and no minimum number of drill holes. The purpose of the last interpolation pass was to interpolate the remaining unestimated blocks mostly located at the edges of the block model, representing 5% of the blocks.

 

21501-REP-PM-001
Page | 199

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Figure 14-23 illustrates the three search ellipsoids used for the different interpolation passes.

 

Figure 14-24 show the results of the block model interpolation in longitudinal view.

 

 

Figure 14-23 – Isometric View of Barreiro Search Ellipses

 

 

Figure 14-24 – Isometric View of the Barreiro Interpolated Block Model

 

Note: Legend shows Li2O grades as greater than the first number, and less than the second in each colour range.

 

14.3.9Model Validation

 

In order to validate the interpolation process, the block model grades were compared statistically to the assay and composite grades. The distribution of the assays, composites and blocks are normal (gaussian) and show similar average values with decreasing levels of variance (Figure 14-25).

 

21501-REP-PM-001
Page | 200

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 14-25 – Statistical Comparison of Barreiro Assay, Composite and Block Data

 

The assays and composites have average values of 1.38% and 1.40% Li2O respectively with variances of 0.8 and 1.0% Li2O. The interpolated blocks have an average value of 1.31% Li2O with a variance of 0.20% Li2O.

 

Furthermore, the block values were compared to the composite values located inside the interpolated blocks. This enables to test for possible over- or under-estimation of the grade by the search parameters by testing the local correlation between the two values. A correlation of determination of 0.70 (R2) was established between the blocks and the composites (Figure 14-26) which is typical and considered acceptable for this type of deposit.

 

 

Figure 14-26 – Barreiro Block Values Versus Composites Inside Those Blocks

 

21501-REP-PM-001
Page | 201

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

14.3.10Mineral Resources Classification

 

The MRE for the Barreiro deposit is prepared and disclosed in compliance with all current disclosure requirements for mineral resources set out in the NI 43-101 Standards of Disclosure for Mineral Projects. The classification of the current MRE into Measured, Indicated and Inferred resources is consistent with current 2014 CIM Definition Standards - For Mineral Resources and Mineral Reserves, including the critical requirement that all mineral resources “have reasonable prospects for eventual economic extraction”.

 

Mineral Resources are sub-divided, in order of increasing geological confidence, into Inferred, Indicated and Measured categories. An Inferred Mineral Resource has a lower level of confidence than that applied to an Indicated Mineral Resource. An Indicated Mineral Resource has a higher level of confidence than an Inferred Mineral Resource but has a lower level of confidence than a Measured Mineral Resource.

 

A Mineral Resource is a concentration or occurrence of solid material of economic interest in or on the Earth’s crust in such form, grade or quality and quantity that there are reasonable prospects for eventual economic extraction.

 

The Mineral Resource classification is based on the density of analytical information and the grade variability and spatial continuity of mineralization. The Mineral Resources were classified in two successive stages: automated classification, followed by manual editing of final classification results.

 

The first classification stage was conducted by applying an automated classification process which selects around each block a minimum number of composites from a minimum number of holes located within a search ellipsoid of a given size and orientation:

 

Measured Mineral Resources: the search ellipsoid was 50 m (strike) by 50 m (dip) by 35 m with a minimum of five composites in at least three different drill holes;

Indicated Mineral Resources: the search ellipsoid was twice the size of the Measured category ellipsoid using the same composites selection criteria;

Inferred Mineral Resources: all remaining blocks.

 

21501-REP-PM-001
Page | 202

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Figure 14-27 is a plan view showing the final classifications.

 

 

Figure 14-27 – Barreiro Block Model Classification

 

14.3.11Reasonable Prospects of Eventual Economic Extraction

 

The general requirement that all mineral resources have “reasonable prospects for eventual economic extraction” implies that the quantity and grade estimates meet certain economic thresholds and that the mineral resources are reported at an appropriate cut-off grade taking into account extraction scenarios and processing recoveries. In order to meet this requirement, the lithium mineralization of the Barreiro deposit is considered amenable to open pit extraction.

 

To determine the quantity of material representing “reasonable prospects for eventual economic extraction” by an open pit mining method, Whittle™ pit optimization software was used with reasonable mining and economic assumptions. The pit optimization for the Barreiro deposit was completed by SGS for the current MRE. The pit optimization parameters used are summarized in Table 14-14. A conservative and balanced approach was applied when optimizing the open pit scenario. A Whittle pit shell at a revenue factor of 1.0 ($1,500/t concentrate price) was selected as the ultimate pit shell for the purposes of the MRE for the Barreiro deposit.

 

The reader is cautioned that the results from the pit optimization are used solely for the purpose of testing the “reasonable prospects for economic extraction” by an open pit and do not represent an attempt to estimate mineral reserves. The results are used as a guide to assist in the preparation of a mineral resource statement and to select an appropriate resource reporting cut-off grade.

 

The parameters detailed in Table 14-14 came from either SGS Canada, SMSA or contractors. These parameters are believed to be sufficient to include all block models for future open pit mine planning.

 

21501-REP-PM-001
Page | 203

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 14-14 – Barreiro Pit Optimization Parameters

 

Parameter Unit Value
Concentrate Price (6% Li2O) US$ per tonne $1,500
Pit Slope Degrees 60
Mining Cost US$ per tonne mined $2.20
Processing Cost (incl. crushing) US$ per tonne milled $10.7
General and Administrative US$ tonne of feed $4
Mining Recovery Percent (%) 95
Concentration Recovery (DMS) Percent (%) 60.7
Pit Slopes Fresh Rock Degrees 52-55
Royalties Percent (%) 2
Mining loss / Dilution Percent (%) / Percent (%) 5 / 5
Cut-off Grade Percent (%) Li2O 0.5

 

Figure 14-28 shows a view of the optimized Barreiro pit together with the Barreiro block model.

 

 

Figure 14-28: Isometric View Looking Northeast: Barreiro Deposit Mineral Resource Block Grades and Revenue Factor 1 Pit

 

21501-REP-PM-001
Page | 204

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

14.3.12Mineral Resource Statement

 

The Mineral Resource estimate is reported in Table 14-15 using a 0.5% Li2O cut-off. The Mineral Resources are constrained by the topography and based on the conceptual economic parameters detailed in Table 14-10. The estimate has an effective date of February 11, 2022. The QP for the estimate is Mr. Marc-Antoine Laporte, P.Geo., an SGS employee.

 

Table 14-15 – Barreiro Deposit Mineral Resource Estimate

 

Cut-off Grade
Li2O (%)
Category Tonnage
(t)
Average
Grade Li2O
(%)
LCE (Kt)
0.5 Measured 18,741,000 1.41 653.5
0.5 Indicated 6,341,000 1.30 203.9
0.5 Measured + Indicated 25,081,000 1.38 857.4
0.5 Inferred 3,825,000 1.39 131.5

 

Notes to accompany Mineral Resource table:

 

1.Mineral Resources have an effective date of February 24, 2022 and have been classified using the 2014 CIM Definition Standards. The Qualified Person for the estimate is Mr Marc-Antoine Laporte, P.Geo., an SGS employee.

2.All Resources are presented undiluted and in situ, constrained by continuous 3D wireframe models, and are considered to have reasonable prospects for eventual economic extraction.

3.Mineral Resources are reported assuming open pit mining methods, and the following assumptions: lithium concentrate (6% Li2O) price of US$1,500/t, mining costs of US$2.2/t for mineralization and waste, crushing and processing costs of US$10/t, general and administrative (G&A) costs of US$4/t, concentrate recovery of 60.7%, 2% royalty payment, pit slope angles of 52-55º, and an overall cut-off grade of 0.5% Li2O.

4.Tonnages and grades have been rounded in accordance with reporting guidelines. Totals may not sum due to rounding.

5.Mineral resources which are not mineral reserves do not have demonstrated economic viability. An Inferred Mineral Resource has a lower level of confidence than that applying to a Measured and Indicated Mineral Resource and must not be converted to a Mineral Reserve. It is reasonably expected that the majority of Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration.

6.The results from the pit optimization are used solely for the purpose of testing the “reasonable prospects for economic extraction” by an open pit and do not represent an attempt to estimate mineral reserves. There are no mineral reserves on the Property. The results are used as a guide to assist in the preparation of a Mineral Resource statement and to select an appropriate resource reporting cut-off grade.

7.The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues.

 

Factors that can affect Mineral Resource estimates include but are not limited to:

 

Changes to the modelling method or approach

Changes to geotechnical assumptions, in particular, the pit slope angles

Metallurgical recovery assumption that are based on preliminary test results

Changes to any of the social, political, economic, permitting, and environmental assumptions considered when evaluating reasonable prospects for eventual economic extraction

Mineral Resource estimates can also be affected by the market value of lithium and lithium compounds.

 

21501-REP-PM-001
Page | 205

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

14.4Murial Deposit

 

14.4.1Exploratory Data Analysis

 

The final database used for the Murial pegmatite Mineral Resource estimation was transmitted to SGS by SMSA on December 13, 2018, in Microsoft® Excel format and Datamine format. The database validation steps are discussed in Section 12. The database comprised 34 drill holes with entries for:

 

Down hole surveys (n = 2,002)

Assays (n = 1,750)

Lithologies (n = 327).

 

The database was validated upon importation in Genesis©, which enabled the correction of minor discrepancies between the table entries, surveys, and lithologies.

 

Vertical sections were generated oriented east-west following the drilling pattern and the general trend of the pegmatite unit. In general, the sections are spaced at 50 m intervals. Figure 14-29 is a drill collar location plan.

 

 

Figure 14-29 – Murial Drill Hole Collar Locations

 

Note: North is to top of figure.

 

The topographic surface that was used by SGS was a 1 m precision DEM (refer to Section 9.2).

 

14.4.2Analytical Data

 

There is a total of 1,750 assay intervals in the database used for mineral resource estimation; 728 assays are contained inside the mineralized solids. Most of the drill hole intervals defining the mineralized solids have been sampled continuously. Table 14-16 shows the range of Li2O values from the analytical data.

 

Table 14-16 – Murial Assay Statistics Inside Mineralized Solids

 

  Li20
(%)
Count 728
Mean 1.17
Std. Dev. 0.82
Min 0.02
Median 1.16
Max 4.28

 

21501-REP-PM-001
Page | 206

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

14.4.3Composite Data

 

Block model grade interpolation was conducted on composited analytical data. A 1 m composite length was selected based on the north–south width of the 5 m by 3 m by 5 m block size defined for the resource block model. Compositing starts at the bedrock-overburden contact. No capping was applied on the analytical composite data.

 

Table 14-17 shows the statistics of the analytical composites used for the interpolation of the resource block model. Figure 14-30 shows an example histogram.

 

Table 14-17 – Murial 1 m Composite Statistics

 

  Li20
(%)
Count 641
Mean 1.19
Std. Dev. 0.71
Min 0.02
Median 1.24
Max 3.10

 

 

Figure 14-30 – Murial 1 m Composite Histogram

 

14.4.4Density

 

Density determinations are outlined in Section 11.3. An average density value of 2.69 t/m3 was determined for the mineralized pegmatite. This value was used for the calculation of the tonnages from the volumetric estimates of the resource block model.

 

14.4.5Geological Interpretation

 

SGS conducted the interpretation of the 3D wireframe solids of the mineralization based on the drill hole data and surface mapping done by SMSA geologists. For the purpose of modelling, sections (looking north) were generated every 50 m, with intermediate section where necessary to tie in the solids. The modelling was first completed on sections to define mineralized shapes using the lithology and lithium analytical data. A minimum grade of 0.3% Li2O over a minimum drill hole interval length of 1.5 m was generally used as guideline to define the width of mineralized shapes. The final 3D wireframe model (solid) was constructed by linking the defined mineralized shapes based on the geological interpretation (refer to Figure 7-8).

 

21501-REP-PM-001
Page | 207

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

The linked interpretation shows one pegmatite body, with an orientation of 95º and a dip averaging -80º to the west. The pegmatite body was modelled with one envelope that starts sub-vertical on the west side and flattens to around 35º dip on the eastern side, probably due to local folding. Additional drilling will be required to support the model interpretation.

 

The mineralized solids were clipped directly on the DEM surface and the average depth of soil overburden thickness is about 4 m. No saprolite zone was logged by Sigma geologists. Figure 14-31 shows the final 3D wireframe solids in isometric view with the drill hole pierce points.

 

 

Figure 14-31 – Murial Pegmatite Solid (looking west)

 

14.4.6Resource Block Modeling

 

A block size of 5 m by 3 m by 5 m (vertical) was selected for the Murial resource block model based on drill hole spacing and the width and general geometry of mineralization. No rotation was applied to the block model. The 5 m vertical dimension corresponds to the bench height of a potential small open pit mining operation. The 5 m northeast–southwest dimension corresponds to about a tenth of the minimum drill spacing and accounts for the variable geometry of the mineralization in that direction. The 3 m northwest–southeast block dimension accounts for the average minimum width of the mineralization modelled at Murial. The resource block model contains 47,117 blocks located inside the mineralized solids, for a total volume of 2,633,891 m3. Table 14-18 summarizes the block model limit parameters.

 

21501-REP-PM-001
Page | 208

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 14-18 – Murial Resource Block Model Parameters

 

Direction Block
Size
(m)
Number of
Blocks
Coordinates
(Local Grid) Min
(m)
Coordinates
(Local Grid) Max
(m)
East–west (x) 5 63 192,518 192,828
North–south (y) 3 282 8,141,157 8,142,000
Elevation (z) 5 61 61 431

 

14.4.7Block Model Interpolation

 

The grade interpolation for the Murial resource block model was completed using an inverse distance weighting to the second power (ID2) methodology. The inverse squared distance weighting method assigns a grade to each block in the block model, without the necessity of a sample being within the block volume. With the ID2 method, the grade, thickness or any other value for the sample is adjusted by the inverse of the distance to the sample, squared. All adjusted sample weights are summed, then divided by the sum of the inverse distances. Closer samples are given greater weight than samples farther away.

 

The interpolation process was conducted using three successive passes with more inclusive search conditions from the first pass to the next until most blocks were interpolated.

 

Variable search ellipse orientations were used to interpolate the blocks. The general dip of the mineralized pegmatite was modelled on each section and then interpolated in each block. During the interpolation process, the search ellipse was orientated based on the interpolation direction of each block, hence better representing the local dip and orientation of the mineralization.

 

The first pass was interpolated using a search ellipsoid distance of 75 m (long axis) by 75 m (intermediate axis) and 35 m (short axis) with an orientation of 95° azimuth and -80° dip to the east which represents the general geometry of the pegmatites in the deposit. Using search conditions defined by a minimum of seven composites, a maximum of 15 composites and a minimum of three drill holes, 53% of the blocks were estimated. For the second pass, the search distance was twice the search distance of the first pass and composites selection criteria were kept the same as for the first pass. A total of 82% of the blocks were interpolated following the second pass.

 

Finally, the search distance of the third pass was increased to 200 m (long axis) by 200 m (intermediate axis) by 100 m (short axis) with a minimum of seven composites, a maximum of 20 composites and no minimum number of drill holes. The purpose of the last interpolation pass was to interpolate the remaining unestimated blocks mostly located at the edges of the block model, representing 18% of the blocks.

 

21501-REP-PM-001
Page | 209

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Figure 14-32 illustrates the three search ellipsoids used for the different interpolation passes.

 

Figure 14-33 show the results of the block model interpolation in longitudinal view.

 

 

Figure 14-32 – Isometric View of Murial Search Ellipsoids

 

 

Figure 14-33 – Isometric View of Murial Interpolated Block Model

 

14.4.8Model Validation

 

In order to validate the interpolation process, the block model grades were compared statistically to the assay and composite grades. The distribution of the assays, composites and blocks are normal (gaussian) and show similar average values with decreasing levels of variance (Figure 14-34).

 

21501-REP-PM-001
Page | 210

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 14-34 – Statistical Comparison of Murial Assay, Composite and Block Data

 

The assays and composites have average values of 1.17 and 1.19% Li2O with variances of 0.68 and 0.50% Li2O. The interpolated blocks have an average value of 0.99% Li2O with a variance of 0.18% Li2O.

 

Furthermore, the block values were compared to the composite values located inside the interpolated blocks. This enables a test for possible over- or under-estimation of the grade by the search parameters by testing the correlation between the two values. A correlation of determination of 0.10 (R2) was established between the blocks and the composites (Figure 14-35). This relatively low but can be explained by the high level of internal variance in the deposit and is considered acceptable.

 

 

Figure 14-35 – Murial Block Values Versus Composites Inside Those Blocks

 

21501-REP-PM-001
Page | 211

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

14.4.9Mineral Resources Classification

 

The Mineral Resources are classified into Measured, Indicated and Inferred categories. The Mineral Resource classification is based on the density of analytical information, the grade variability and spatial continuity of mineralization. The Mineral Resources were classified in two successive stages: automated classification, followed by manual editing of final classification results.

 

The first classification stage is conducted by applying an automated classification process which selects around each block a minimum number of composites from a minimum number of drill holes located within a search ellipsoid of a given size and orientation.

 

Measured Mineral Resources: the search ellipsoid was 55 m (strike) by 55 m (dip) by 35 m with a minimum of five composites in at least three different drill holes.

Indicated Mineral Resources: the search ellipsoid was twice the size of the Measured category ellipsoid using the same composites selection criteria.

Inferred Mineral Resources: all remaining blocks were considered to be in the Inferred category

 

Figure 14-36 is a plan view showing the final classifications.

 

 

 

Figure 14-36 – Murial Block Model Classification

 

The lower east side of the deposit only has one observation point and so is classified as Inferred Mineral Resources.

 

14.4.10Reasonable Prospects for Eventual Economic Extraction

 

The conceptual economic parameters were used to assess reasonable prospects of eventual economic extraction. A series of economic parameters were estimated to represent the production cost and economic prospectivity of an open pit mining operation in Brazil. They are detailed in Table 14-19 and came either from SGS Canada or SMSA. These parameters are believed to be sufficient to include all block models in future open pit mine planning mostly due to the relatively low mining costs in Brazil but need to be confirmed.

 

21501-REP-PM-001
Page | 212

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 14-19 – Murial Parameters for Reasonable Prospect for Eventual Economic Extraction

 

Parameters Value Unit References
Sales Revenues      
Concentrate Price (6% Li2O) 1000.00 US$/t Sigma
Operating Costs      
Mining Mineralized Material 2.0 US$/t Sigma
Mining Overburden 1.2 US$/t Sigma
Mining Waste 2.0 US$/t Sigma
Crushing and Processing 12.0 US$/t Sigma
General and Administration 4.0 US$/t Sigma
Metallurgy and Royalties      
Concentration Recovery 85 % SGS Canada Inc
Royalties 2 % Sigma
Geotechnical Parameters      
Pit Slopes 55 Degrees SGS Canada Inc
Mineralized Material Density 2.69 t/m3 SGS Canada Inc
Waste Material Density 2.79 t/m3 SGS Canada Inc
Overburden 1.61 t/m3 SGS Canada Inc
Cut-Off Grade 0.5 %Li2O SGS Canada Inc

 

Note: Concentration recovery (flotation test) are based on preliminary results from SGS Lakefield laboratory and may change at the completion of the test. Overburden density was taken from the average value of saprolitic soil as defined by Tan (2003).

 

14.4.11Mineral Resource Statement

 

The Mineral Resource estimate is reported using a 0.5% Li2O cut-off. The Mineral Resources are constrained by the topography and are based on the conceptual economic parameters detailed in
Table 14-20. The estimate has an effective date of January 10, 2019. The QP for the estimate is Mr. Marc-Antoine Laporte, P.Geo., an SGS employee.

 

Table 14-20 – Murial Deposit Mineral Resource Estimate

 

Cut-off Grade
Li2O (%)
Category Tonnage
(t)
Average
Grade Li2O
(%)
LCE (Kt)
0.5 Measured 4,175,000 1.17 120.8
0.5 Indicated 1,389,000 1.04 35.7
0.5 Measured + Indicated 5,564,000 1.14 156.5
0.5 Inferred 669,000 1.06 17.5

 

Notes to accompany Mineral Resource table:

 

1.Mineral Resources have an effective date of January 10, 2019, and have been classified using the 2014 CIM Definition Standards. The Qualified Person for the estimate is Mr. Marc-Antoine Laporte, P.Geo., an SGS employee.

2.Mineral Resources are reported assuming open pit mining methods, and the following assumptions: lithium concentrate (6% Li2O) price of US$1,000/t, mining costs of US$2/t for mineralization and waste, US$1.2/t for overburden, crushing and processing costs of US$12/t, general and administrative (G&A) costs of US$4/t, concentrate recovery of 85%, 2% royalty payment, pit slope angles of 55º, and an overall cut-off grade of 0.5% Li2O.

3.Tonnages and grades have been rounded in accordance with reporting guidelines. Totals may not sum due to rounding.

4.Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

 

21501-REP-PM-001
Page | 213

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Factors that can affect Mineral Resource estimates include but are not limited to:

 

Changes to the modelling method or approach

Changes to geotechnical assumptions, in particular, the pit slope angles

Metallurgical recovery assumptions that are based on preliminary test results

Changes to any of the social, political, economic, permitting, and environmental assumptions considered when evaluating reasonable prospects for eventual economic extraction

Mineral Resource estimates can also be affected by the market value of lithium and lithium compounds.

 

14.5Lavra Do Meio Deposit

 

14.5.1Exploratory Data Analysis

 

The final database used for the Lavra do Meio pegmatite mineral resource estimation was transmitted to SGS by SMSA on December 13, 2018 in Microsoft® Excel format and Datamine format. The database validation steps are discussed in Section 12. The database comprised 17 drill holes with entries for:

 

Down hole surveys (n = 717)

Assays (n = 656)

Lithologies (n = 119)

 

The database was validated upon importation in Genesis©, which enabled the correction of minor discrepancies between the table entries, surveys, and lithologies.

 

Vertical sections were generated oriented east-west following the drilling pattern and the general trend of the pegmatite unit. In general, the sections are spaced at 50 m intervals. Figure 14-37 is a drill collar location plan.

 

21501-REP-PM-001
Page | 214

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

  

Figure 14-37 – Lavra Do Meio Drill Hole Collar Locations

 

Note: North is to top of figure.

 

21501-REP-PM-001
Page | 215

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

The topographic surface that was used by SGS was a 1 m precision DEM (refer to Section 9.2).

 

14.5.2Analytical Data

 

There is a total of 656 assay intervals in the database used for the Mineral Resource estimate; 405 assays are contained inside the interpreted mineralized solids. Most of the drill holes defining the mineralized solids have been sampled continuously.

 

Table 14-21 shows the range of Li2O values from the analytical data.

 

Table 14-21Lavra do Meio Assay Statistics Inside Mineralized Solids

 

  Li20
(%)
Count 405
Mean 1.13
Std. Dev. 1.01
Min 0.02
Median 0.94
Max 6.15

 

14.5.3Composite Data

 

Block model grade interpolation was conducted on composited analytical data. A 1 m composite length was selected based on the north–south width of the 5 m by 3 m by 5 m block size defined for the resource block model. Compositing starts at the bedrock-overburden contact. No capping was applied on the analytical composite data.

 

Table 14-22 shows the grade statistics of the analytical composites used for the interpolation of the resource block model and Figure 14-38 shows the related histogram for Li2O.

 

Table 14-22Lavra do Meio 1 m Composite Statistics

 

  Li20
(%)
Count 359
Mean 1.14
Std. Dev. 0.86
Min 0.02
Median 1.04
Max 5.90

 

21501-REP-PM-001
Page | 216

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

 

Figure 14-38 – Lavra do Meio 1 m Composite Histogram

 

14.5.4Density

 

Density determinations are outlined in Section 11.3. An average density value of 2.65 t/m3 was determined for the mineralized pegmatite. This value was used for the calculation of the tonnages from the volumetric estimates of the resource block model.

 

14.5.5Geological Interpretation

 

SGS conducted the interpretation of the 3D wireframe solids of the mineralization based on the drill hole data and surface mapping done by SMSA geologists. For the purpose of modelling, sections (looking north) were generated every 50 m, with intermediate sections where necessary to tie in the solids. The modelling was first completed on sections to define mineralized shapes using the lithology and lithium analytical data. A minimum grade of 0.3% Li2O over a minimum drill hole interval length of 1.5 m was generally used as a guideline to define the width of the mineralized shapes. The final 3D wireframe model (solid) was constructed by linking the defined mineralized shapes based on the geological interpretation (refer to Figure 7-6).

 

The linked interpretation shows one pegmatite body, with a strike orientation of azimuth 280° and a dip averaging -75° to the east. The pegmatite body was modelled as two envelopes split by a major fault that can be traced on surface. Some drill holes show a possible north–south deformation zone that also affects the deposit and possibly connects the two zones (either totally or partially). This interpretation will require additional drill testing.

 

The mineralized solids were clipped directly on the DEM surface and the average depth of soil overburden is 5.7 m. No saprolite zone was logged by the Sigma geologists.

 

 

21501-REP-PM-001
Page | 217

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Figure 14-39 shows the final 3D wireframe solids in isometric view with the drill hole pierce points.

 

 

 

Figure 14-39 – Lavra do Meio Pegmatite Solid (looking west)

 

14.5.6Resource Block Modeling

 

A block size of 5 m (northeast–southwest) by 3 m (northwest–southeast) by 5 m (vertical) was selected for the Lavro do Meio resource block model based on drill hole spacing, width and general geometry of mineralization. No rotation was applied to the block model. The 5 m vertical dimension corresponds to the bench height of a potential small open pit mining operation. The 5 m northeast–southwest dimension corresponds to about a tenth of the minimum drill spacing and accounts for the variable geometry of the mineralization in that direction. The 5 m northwest–southeast block dimension accounts for the minimum width of the mineralization modelled at Lavro do Meio. The resource block model contains 19,088 blocks located inside the mineralized solids, for a total volume of 1,048,241 m3. Table 14-23 summarizes the block model limit parameters.

 

Table 14-23Lavra do Meio Resource Block Model Parameters

 

Direction Block
Size
(m)
Number of
Blocks
Coordinates
(Local Grid) Min
(m)
Coordinates
(Local Grid) Max
(m)
East–west (x) 5 76 192,225 192,600
North–south (y) 3 226 8,140,250 8,140,925
Elevation (z) 5 57 110 390

 

14.5.7Variography

 

In order to determine the continuity and distribution of the Li2O grades, the 1 m composites were submitted to a variographic study. The variographic analysis helped determine the search ellipses criteria and define the kriging parameters for the block interpolation process.

 

The composites show a normal distribution with a relatively high standard deviation of 0.86 Li2O%. This prevented the use of a single correlogram model. Instead, two were generated, one for short distances and one for long distances.

 

21501-REP-PM-001
Page | 218

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

The short-distance correlogram was computed on untransformed composites. The long-distance correlogram was computed on transformed composites. The transformations involve projection of the composites and rescaling of the Z axis. This was to ensure a constant planar area of composite that could be used to identified long distance thin structure in the mineralized zone. Multiple iterations of variographic analyses were conducted on the transformed composites, each involved different Z slicing. The resulting correlogram is shown in Figure 14-40.

 

 

 

Figure 14-40 – Lavra do Meio Combined Correlogram

 

The transformation process is omnidirectional by nature, so no preferred orientation and dip were identified during the modelling process. However, projection and Z-axis rescaling were done according to the mineralization orientation of 100º of azimuth and -75º dip. The long-distance model is therefore optimal in this preferred orientation.

 

14.5.8Block Model Interpolation

 

The grade interpolation for the resource block model was completed using OK. The interpolation process was conducted using three successive passes with more inclusive search conditions from the first pass to the next until most blocks were interpolated.

 

Variable search ellipse orientations were used to interpolate the blocks. The general dip of the mineralized pegmatite was modelled on each section and then interpolated in each block. During the interpolation process, the search ellipse was orientated based on the interpolation direction of each block, hence better representing the dip and orientation of the mineralization.

 

The first pass was interpolated using a search ellipsoid distance of 50 m (long axis) by 50 m (intermediate axis) and 25 m (short axis) with an orientation of 280º azimuth and -75º dip to the east which represents the general geometry of the pegmatites in the Lavra do Meio deposit. Using search conditions defined by a minimum of five composites, a maximum of 15 composites and a minimum of three drill holes, 54% of the blocks were estimated. For the second pass, the search distance was twice the search distance of the first pass and composites selection criteria were kept the same as for the first pass. A total of 91% of the blocks were interpolated following the second pass. Finally, the search distance of the third pass was increased to 125 m (long axis) by 125 m (intermediate axis) by 75 m (short axis) with a minimum of five composites, a maximum of 15 composites and no minimum composites required per drill hole. The purpose of the last interpolation pass was to interpolate the remaining unestimated blocks mostly located at the edges of the block model, representing 9% of the blocks.

 

21501-REP-PM-001
Page | 219

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Figure 14-41 illustrates the three search ellipsoids used for the different interpolation passes. Figure 14-42 shows the results of the block model interpolation in longitudinal view.

 

 

 

Figure 14-41 – Isometric View of Lavra do Meio Search Ellipses

 

 

 

Figure 14-42 – Isometric View of Lavra Do Meio Interpolated Block Model

 

14.5.9Model Validation

 

To validate the interpolation process, the block model grades were compared statistically to the assay and composite grades. The distribution of the assays, composites and blocks are normal (gaussian) and show similar average values with decreasing levels of variance (Figure 14-43).

 

21501-REP-PM-001
Page | 220

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

 

Figure 14-43 – Statistical Comparison of Lavro Do Meio Assay, Composite and Block Data

 

The assays and composites have respective averages of 1.13% Li2O and 1.14% Li2O with variances of 1.01 and 0.74. The interpolated blocks have and average value of 1% Li2O with a variance of 0.17.

 

Furthermore, the block values were compared to the composite values located inside the interpolated blocks. This enables a test for possible over- or under-estimation of the grade by the search parameters by testing the correlation between the two values. A correlation of determination of 0.63 (R2) was established between the blocks and the composites (Figure 14-44) which is typical and considered acceptable for this type of deposit by the QP.

 

 

 

Figure 14-44 – Lavra Do Meio Block Values Versus Composites Inside Those Blocks

 

14.5.10Mineral Resources Classification

 

The Mineral Resources are classified into Measured, Indicated and Inferred categories. The Mineral Resource classification is based on the density of analytical information, the grade variability and spatial continuity of mineralization. The Mineral Resources were classified in two successive stages: automated classification, followed by manual editing of final classification results.

 

21501-REP-PM-001
Page | 221

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

The first classification stage was conducted by applying an automated classification process which selects around each block a minimum number of composites from a minimum number of holes located within a search ellipsoid of a given size and orientation.

 

Classification parameters were:

 

Measured Mineral Resources: the search ellipsoid was 55 m (strike) by 55 m (dip) by 35 m with a minimum of five composites in at least three different drill holes

Indicated Mineral Resources: the search ellipsoid was twice the size of the Measured category ellipsoid using the same composites selection criteria

Inferred Mineral Resources: all remaining blocks.

 

Figure 14-45 illustrates the block model classification.

 

 

 

Figure 14-45 – Lavra Do Meio Block Model Classification

 

14.5.11Reasonable Prospects of Eventual Economic Extraction

 

The conceptual economic parameters were used to assess reasonable prospects of eventual economic extraction. A series of economic parameters were estimated to represent the production cost and economic prospectivity of an open pit mining operation in Brazil. They are detailed in Table 14-24 and came either from SGS Canada or SMSA. These parameters are believed to be sufficient to include all block models in future open pit mine planning mostly due to the relatively low mining costs in Brazil but need to be confirmed.

 

21501-REP-PM-001
Page | 222

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Table 14-24Lavro do Meio Parameters for Reasonable Prospect for Eventual Economic Extraction

 

Parameters Value Unit References
Sales Revenues      
Concentrate Price (6% Li2O) 1000.00 US$/t Sigma
Operating Costs      
Mining Mineralized Material 2.0 US$/t Sigma
Mining Overburden 1.2 US$/t Sigma
Mining Waste 2.0 US$/t Sigma
Crushing and Processing 12.0 US$/t Sigma
General and Administration 4.0 US$/t Sigma
Metallurgy and Royalties      
Concentration Recovery 85 % SGS Canada Inc
Royalties 2 % Sigma
Geotechnical Parameters      
Pit Slopes 55 Degrees SGS Canada Inc
Mineralized Material Density 2.65 t/m3 SGS Canada Inc
Waste Material Density 2.78 t/m3 SGS Canada Inc
Overburden 1.61 t/m3 SGS Canada Inc
Cut-Off Grade 0.5 %Li2O SGS Canada Inc

 

Note: Concentration recovery (flotation test) are based on preliminary results from SGS Lakefield laboratory and may change at the completion of the test. Overburden density was taken from the average value of saprolitic soil as defined by Tan (2003)

 

14.5.12Mineral Resource Estimation

 

The Mineral Resource estimate is reported in Table 14-25 using a 0.5% Li2O cut-off. The Mineral Resources are constrained by the topography and based on the conceptual economic parameters detailed in Table 14-24. The estimate has an effective date of January 10, 2019. The QP for the estimate is Mr Marc-Antoine Laporte, P.Geo., an SGS employee.

 

Table 14-25Lavra do Meio Deposit Mineral Resource Estimate

 

Cut-off

Grade Li2O

(%)

Category Tonnage
(t)
Average
Grade Li2O
(%)
LCE (Kt)
0.5 Measured 1,626,000 1.16 44.6
0.5 Indicated 649,000 0.93 14.9
0.5 Measured + Indicated 2,275,000 1.09 59.5
0.5 Inferred 261,000 0.87 5.6

 

Notes to accompany mineral resource table:

 

1.Mineral Resources have an effective date of January 10, 2019, and have been classified using the 2014 CIM Definition Standards. The Qualified Person for the estimate is Mr Marc-Antoine Laporte, P.Geo., an SGS employee.

2.Mineral Resources are reported assuming open pit mining methods, and the following assumptions: lithium concentrate (6% Li2O) price of US$1,000/t, mining costs of US$2/t for mineralization and waste, US$1.2/t for overburden, crushing and processing costs of US$12/t, general and administrative (G&A) costs of US$4/t, concentrate recovery of 85%, 2% royalty payment, pit slope angles of 55º, and an overall cut-off grade of 0.5% Li2O.

3.Tonnages and grades have been rounded in accordance with reporting guidelines. Totals may not sum due to rounding.

4.Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

5.Long-term lithium concentrate price of $1,000/tonne assumes processing cost of US$12/t and metallurgical recovery of 85%.

 

21501-REP-PM-001
Page | 223

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Factors that can affect the Mineral Resource estimates include but are not limited to:

 

Changes to the modelling method or approach

Changes to geotechnical assumptions, in particular, the pit slope angles

Metallurgical recovery assumption that are based on preliminary test results

Changes to any of the social, political, economic, permitting, and environmental assumptions considered when evaluating reasonable prospects for eventual economic extraction.

Mineral Resource estimates can also be affected by the market value of lithium and lithium compounds.

 

The QP is not aware of any environmental, legal, title, taxation, socioeconomic, marketing, political or other relevant factors that would materially affect the estimation of Mineral Resources that are not discussed in this Report.

 

21501-REP-PM-001
Page | 224

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

15MINERAL RESERVE ESTIMATES

 

15.1Xuxa Mineral Reserves

 

The Xuxa Deposit will be mined by conventional open pit mining methods for an eight-year mine life, at a plant feed rate of 1.5 Mtpy, with Mineral Reserves totalling 11.8 Mt grading 1.57% Li2O (lithium oxide), based on a long-term lithium spodumene selling price of US$1,500/t concentrate FOB Mine

 

The effective date for the Mineral Reserve Estimate is June 29, 2021. A CIM-compliant Mineral Resource Estimate, from which this reserve was calculated, was completed by SGS in 2019 as documented in section 14 of this report.

 

Development of the life of mine (LOM) plan includes pit optimization, pit design, mine scheduling and the application of modifying factors, economic and metallurgical, of the Measured and Indicated Mineral Resources. The basis of which Mineral Reserves are defined is the point where mined ore is delivered to the primary crusher. The tonnages and grades reported are inclusive of geological losses, mining recovery and mining dilution.

 

The Mineral Reserves for the open pit aspects of the Xuxa Deposit were prepared by Porfirio Cabaleiro Rodriguez, FAIG., Senior Mining Engineer with GE21, a Qualified Person (QP) as defined under National Instrument 43-101 regulations.

 

The Mineral Reserve for the Xuxa Deposit was estimated based on a topographic surface dated June 29, 2021, and on a diluted and recoverable block model built over the Mineral Resource block model. This block model applies to two surface pits for mining the North and South pits, as defined in relation to the Piaui River. Geometric limits were determined using an environmental barrier as a protective buffer from the Piaui River separating the pits. Extensive geotechnical and hydrogeological studies also contributed to determining the mining limits. A pit design was developed based upon operational and reliable parameters, resulting in a mine life of eight years.

 

The Mineral Reserve Estimate has been developed using best practices in accordance with the 2019 CIM guidelines and National Instrument 43-101 reporting.

 

The QP is of the opinion that no known risks including legal, political or environmental, would materially affect potential development of the Mineral Reserve, except for those risks discussed in this Report.

 

Table 15-7 presents the Mineral Reserves that have been estimated for the Xuxa project, namely 8.34 Mt of Proven Mineral Reserves at an average grade of 1.55% Li2O and 3.46 Mt of Probable Mineral Reserves at an average grade of 1.54% Li2O for a total of 11.80 Mt of Proven and Probable Mineral Reserves at an average grade of 1.55% Li2O. To access these Mineral Reserves, 195.4 Mt of waste rock must be mined, resulting in a strip ratio of 16.6:1 t/t.

 

Mineral Reserves are an estimate of the ore grade and tonnage that can be economically mined and processed. For the Project, Mineral Reserve estimation used open-pit mining methods as this was determined to be the most economic mining method for the Xuxa deposit.

 

The final pit and the mine planning were based on a pit optimization using Whittle software. The mining plan developed in this report is based on Measured and Indicated Mineral Resources only. There is a low geological confidence associated with Inferred Mineral Resources, and there is no certainty that further exploration work will result in the Inferred Mineral Resources becoming Indicated Mineral Resources.

 

21501-REP-PM-001
Page | 225

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Figure 15-1 shows the final Xuxa mine configuration.

 

 

 

Figure 15-1: Final Xuxa Mine Configuration

 

15.2Xuxa Pit Optimization Parameters

 

The technical and economic parameters listed in Table 15-1 were used to generate the optimal pit, which consists of a pit that maximizes the project economic value, as obtained by applying the Lerchs-Grossman algorithm implemented by the Geovia Whittle software program.

 

The methodology for the selection of the optimal pit consists of generating a set of nested pits from the application of revenue factors. The factor is applied to the sale price of the commercial product, resulting in a mathematical pit for each factor applied. The resulting generated pits are analyzed to define the final optimal pit for the deposit.

 

21501-REP-PM-001
Page | 226

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Table 15-1: Technical and Economic Parameters Used in the Final Xuxa Pit Optimization

 

Item Unit Value
Revenue Sales Price US$/t conc.* $1500.00
Ore Density g/cm³ fixed in model
Grade % Li2O fixed in model
Mining Mine Recovering % fixed in model
Dilution fixed in model
Block Model Dimensions Block Dimensions Unit value
X x Y x Z m 5 x 3 x 5
General Angle Soil º 34
Saprolite 37.5
Fresh Rock

Sector 1 – 72º

Sector 2 – 50º

Processing Metallurgical Recovery** % 60.7
Mass Recovery*** % Calculated in block
Concentrated Grade % Li2O 6.0
Cut-off % Li2O 0.5
Costs Mining US$/t mined $2.20
Processing US$/t ore $10.70
G&A (Adjusted for OPEX) $4.00
Sale (2% cost of sale) US$/t product $14.66
  Royalties (CFEM 2%) $14.66

 

Note: * conc. = concentrate, ** based on DMS Tests, *** Including 15% fines losses - FOB Mine

 

15.2.1Physical Parameters

 

The information relative to the physical aspects and restrictions that were used for the open pit designs and Mineral Reserve Estimate included the topographic surface, the geological block model, and the rock type properties for ore, waste and overburden.

 

The mine planning work carried out for the DFS was performed using Geovia MineSched 2020 software.

 

15.2.1.1Topographic Surface

 

The mine design was based on a topographic surface based on 1 m contour intervals. The contours were supplied by Sigma and derived from a drone topographic survey that took place June 29, 2021.

 

15.2.1.2Geotechnical Parameters

 

Figure 15-2 shows the geotechnical sectors for the North, and South pits presented in this feasibility study. The red lines represent the limits for the sectors in each pit. The pit slope angles used are listed in Table 15-2.

 

The geotechnical and hydrogeological parameters used in the open-pit design are defined in Section 16.1 – Geotechnical and Hydrogeological Analysis.

 

21501-REP-PM-001
Page | 227

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

 

Figure 15-2: Xuxa North and South Pit Geotechnical Sectors

 

Table 15-2: Xuxa Geotechnical Pit Slope Design Criteria

 

Sectors

Face Angle

(°)

Berm Width

(m)

Bench Height

(m)

Angle between Ramps /
Overall

(°)

A 60 6 20 48 / 46
B 82 6 20 66 / 61
C 82 6 20 67 / 62
D 82 6 20 66 / 61
E 82 6 20 66 / 61
F 60 6 20 48 / 48
G 82 6 20 66 / 59
H 82 6 20 66 / 61
I 82 6 20 66 / 59

 

15.2.1.3Natural Limits

 

A buffer of 30 m from the pit crests to the Piaui River was used as the surface limit of mining, as defined by the environmental license permits.

 

21501-REP-PM-001
Page | 228

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

15.2.1.4Rock Type Properties

 

The rock type properties are outlined below. Rock properties are important in estimating the Mineral Reserves, the equipment fleet requirements, as well as the dump and stockpile design capacities.

 

15.2.1.4.1Density

 

The in-situ dry density of the mineralized material was estimated to be 2.70 t/m³. A density of 2.73 t/m³ has been used for waste schist rock, a density of 2.20 t/m³ for weathered schist overburden, and a density of 2.30 t/m³ for soil overburden.

 

15.2.1.4.2Swell Factor

 

An average swell factor of 15% was estimated for the in-situ material transported to the waste dump. This factor was used to define waste dump volumes but does not affect the Mineral Reserves estimate.

 

15.2.1.4.3Moisture Content

 

A general moisture content factor of 6% was estimated for in-situ rock material. The final fleet sizing was provided by a contractor who will carry out mining activities during the life of the mining operation. This factor was used to define fleet sizing and does not influence the Mineral Reserve estimate.

 

15.2.1.5Mineral Resource Block Model

 

The Mineral Resource block model provided by SGS (described in section 14) was the base used by GE21 to build the modified Mineral Reserve block model.

 

15.3Xuxa Modifying Factors

 

The modifying factors listed below were applied to convert the Mineral Resources into Mineral Reserves for the pit optimization analysis and the open pit design.

 

15.3.1Economic and Metallurgical Factors

 

The economic and metallurgical factors used for the open pit and Mineral Reserve Estimates include the assumed long-term Li2O concentrate sale price, economic cut-off grade, metallurgical recovery, concentrate grade, mining costs, processing costs, G&A costs, sales cost, and royalties.

 

15.3.1.1Long-Term Concentrate Price

 

A long-term sale price of US$1,500/t concentrate FOB Mine for spodumene (6% Li2O) was used, based on market studies provided by Sigma.

 

15.3.1.2Cut-Off Grade

 

A cut-off grade of 0.5% Li2O as defined for the Mineral Resource Estimate.

 

15.3.1.3Metallurgical Factors

 

An overall metallurgic recovery of 60.7% for the dense media separation (DMS) operation was used for metallurgical recovery, with a concentrate grade of 6% Li2O, resulting in a calculated mass recovery, after allowing for fines losses of 15%, block by block of mined ore by the formula:

 

 

 

15.3.1.4Mining and Processing Costs Factors

 

Optimization economics used a mining cost of US$2.20/t and a processing cost of US$10.7/t ore, based on the 2019 Feasibility Study developed for the Xuxa Project.

 

21501-REP-PM-001
Page | 229

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

15.3.1.5Other Costs

 

The cost assumptions were compiled using a value of US$4.00/t ore for G&A cost, and royalties at 2% of the concentrate price (US$14.66/t concentrate).

 

15.3.2Selective Mining Unit (SMU) Selection

 

The conventional definition of the selective mining unit (SMU) is the smallest volume of material on which ore/waste classification is determined.

 

In order to determine the optimal SMU for Xuxa, GE21 analyzed a number of block dimension alternatives, ranging in size from 20 m x 12 m x 5 m (x, y, z) to 5 m x 3 m x 2.5 m (x, y, z). Isastis software was used to perform a uniform conditioning simulation on the various SMU alternatives using Li2O% as the estimated variable.

 

Figure 15-3 shows the results of the uniform conditioning estimate.

 

Based on the analysis, GE21 determined that an SMU of 5 m x 3 m x 5 m was suitable.

 

 

 

Figure 15-3: Grade x Tonnage Curve with Selectivity Results Based on Local Uniform Conditioning Estimate

 

15.3.3Dilution and Loss Estimate

 

Once the SMU was defined and a grade control procedure established, GE21 prepared a diluted block model to be used in mine planning. The main assumptions adopted by GE21 were:

 

Considering that the grade control drill hole can only be checked every metre, a pegmatite bounding envelope was created based on the one-metre-wide edge, as shown in Figure 15-4.

 

The block model was sub-blocked at 5 m x 3 m x 1 m.

 

The blocks within the enclosed envelope, the pegmatite bounding envelope, were classified as waste. The schematic diagram in Figure 15-5 represents the partial effect of this assumption on the blocks near the end face of the bench.

 

21501-REP-PM-001
Page | 230

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

For the blocks still within the remaining pegmatite solid, a minimum 97% ore recovery was assumed, allowing an average 3.75% schist dilution in ROM, as shown in the dilution parameterization curve in Figure 15-6.

 

GE21 has considered accepting blocks at the edge of the fixed pegmatitic wireframe structure with a minimum 64% to 76% recovery rate.

 

An overall 3.75% mean dilution was assumed for the diluted pegmatite, with results varying for blocks with different heights (5 m and 1 m), as shown in the Table 15-3, resulting in a mining recovery equivalent to 83% when considering the relationship between the undiluted model for the resource model, or 82.5% while maintaining a 3.75% average dilution rate relative to a partial model in the original resource model. A simulation with a more conservative method was performed maintaining the 3.75% dilution rate, using a partial model in the wire structure fixed over the diluted zone and the schist zone, and using both 5-metre- and 1-metre-high blocks (Figure 15-6, Figure 15-7 and Figure 15 8).

 

GE21 adopted option (1), representing effective ore recovery of 82.5%, and maintaining a 3.75% dilution rate, to be used in the pit optimization phase.

 

Table 15-3: Mining Recovery Versus Partial Percentage on Block Height

 

Source Partial
Percentage
Cut

Total Mass
After Cut

(Mt)

Minimum
Mining
Recovery
Average Partial
Percentage

Total
Resource on
Source

(Mt)

Mining
Recovery
Resource Model - - 100% - 21.2 100%
Undiluted Solid (1) 0.72 17.5 82.5% 0.97 17.7 99%
Undiluted Solid (2) 0.76 13.6 64% 0.97 17.7 83%
Undiluted Solid (3) 0.64 15.6 74% 0.97 17.7 83%

 

(1)5-metre block model in general pegmatite resource Z model

(2)5-metre block model in Z, enclosed pegmatite

(3)1-metre block model in Z, enclosed pegmatite

 

21501-REP-PM-001
Page | 231

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

 

Figure 15-4: Cross-Section Showing the Original Pegmatite (white line) and the One Reduced At 1 M from the Edge (brown line). Blocks are Coloured Blue to Red in Relation to their Partial Percentage within the Reduced Solid (Blue = 0%, Red = 100%)

 

 

 

Figure 15-5: Schematic Representation of the Dilution Analysis

21501-REP-PM-001
Page | 232

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

 

Figure 15-6: Xuxa Tonnage vs Partial Percentage – Dilution – 5 m

 

 

 

Figure 15-7: Tonnage vs Partial Percentage – Dilution – 1 m

 

21501-REP-PM-001
Page | 233

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

 

Figure 15-8: Tonnage vs Partial Percentage – Solid Internal Dilution – 5 m

 

15.4Xuxa Pit Optimization Study

 

The determination of the pit optimization was based on:

 

Definition of economic and geometric parameters, cut-off grade, and physical restrictions.

 

Modified Mineral Resource Block Model to include the modified factors.

 

Definition of an optimal pit using Geovia Whittle 4.3 software.

 

The selection of the optimum pit, based on a strip ratio limit, and allowance for a mine life long enough to support a positive cash flow.

 

The technical and economic parameters listed in Table 15-1 were used to generate the optimal pit, which consists of a pit that maximizes the project economic value, as obtained by applying the Lerchs-Grossman algorithm implemented by the Geovia Whittle software program.

 

The optimal pit sequence was obtained by varying the revenue factor in a range from 30% to 200% of the base product selling price. In order to determine the evolution of the pits over time, an annual production rate of 1.5 Mtpa of ore feed was established at an annual discount rate of 10%. Table 15-4, and Figure 15-9 present the pit optimization parameters and shows the evolution of the resulting optimization pushbacks with the chosen optimal pit highlighted.

 

The selected pit was the Pit 6 related to a revenue factor of 0.7 which represents a sales price of around US$ 1,050/t conc. Li2O. The selection was based on the selling price below the reference price (US$ 1,500/t conc. Li2O) that stabilizes the parameters of the optimization results, such as:

 

Relative NPV

 

21501-REP-PM-001
Page | 234

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Ore tonnage

 

Strip ratio

 

Grade

 

It is observed that there is no meaningful economic benefit when the sales price of the concentrate for pit optimization is greater than US$ 1050/t conc. Li2O, since the pits are physically constrained by the Piauí River and a product price increase does little to increase ore tonnage.

 

Table 15-4: Xuxa Pit Optimization Results

 

Pit Revenue Factor Total
Movement
Ore Waste Waste-Ore Ratio Li2O
(Mt) (Mt) (Mt)   %
1 0.2 40.0 4.60 35.4 7.69 1.70
2 0.3 123.5 10.44 113.1 10.83 1.63
3 0.4 149.0 11.59 137.4 11.85 1.61
4 0.5 163.6 12.07 151.5 12.55 1.60
5 0.6 172.5 12.28 160.2 13.04 1.60
6 0.7 176.8 12.36 164.5 13.3 1.60
7 0.8 178.8 12.40 166.4 13.42 1.60
8 0.9 180.6 12.43 168.2 13.54 1.60
9 1 183.7 12.47 171.2 13.73 1.60
10 1.1 186.1 12.49 173.6 13.9 1.60
11 1.2 186.4 12.50 173.9 13.92 1.60
12 1.3 187.0 12.50 174.5 13.96 1.60
13 1.4 187.2 12.50 174.6 13.97 1.60
14 1.5 187.7 12.51 175.2 14.01 1.60
15 1.6 188.6 12.51 176.1 14.07 1.60
16 1.7 188.8 12.51 176.3 14.09 1.60
17 1.8 189.3 12.52 176.8 14.12 1.60
18 1.9 189.6 12.52 177.1 14.15 1.60

 

21501-REP-PM-001
Page | 235

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

 

Figure 15-9: Pit by Pit Graph of Optimization Results

 

15.4.1Mine Design

 

Mine design comprises the design of an operational pit, including the main elements, ramps, berms, and access over the selected optimal pit, for the mining of the Mineral Reserves in an operationally feasible design.

 

The methodology consists of tracing the benches, toe and crest outline, safety berms, construction sites, and access ramps, while respecting the geometric and geotechnical parameters defined by geotechnical and hydrogeological studies. The assumptions adopted for the operationalization of the final pit were:

 

§Minimize ore mass loss.

 

§Define access routes for shorter average transport distances.

 

Table 15-5 presents the geometric parameters adopted to develop the mine design and Figure 15-11 presents the pit wall configuration based on those parameters.

 

21501-REP-PM-001
Page | 236

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 15-5: Xuxa Open Pit Operational Design Parameters

 

Final Pit Operational Parameters
Parameters Value Unit
Bench Height 20.0 metres
Overburden General Angle - Soil 40.0 º
Berm Width - Soil 6.0 metres
General Angle - Saprolite 42.0 º
Berm Width - Saprolite 6.0 metres
Fresh Rock General Angle - Sector 1 82.0 º
Berm Width - Sector 1 6.0 metres
General Angle - Sector 1 60.0 º
Berm Width - Sector 1 6.0 metres
Access Ramps Width 12.0 metres
Access Ramps Inclination 10.0 %

 

 

 

Figure 15-10: Xuxa Pit Wall Configuration

 

A fleet of conventional road trucks is planned to transport ore and waste. The width of the access road to the final pit was designed at 12 m. Within the pit, the road has a running surface of 10 m for trucks and a total width of 12 m (Figure 15-11). For mining the lower benches, which mainly consist of mineralized material, the width of the road was reduced to 6 m.

 

Figure 15-12 shows the final design of the operational pit and Table 15-6 shows the total ore and waste expected to be mined.

 

The final commissioned pit would contain 11.8 Mt of ore and 195.4 Mt of waste with a 16.6:1 strip-ratio, resulting in a mine life of approximately eight years.

 

21501-REP-PM-001
Page | 237

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

 

Figure 15-11: Xuxa Pit Ramp Design

 

Table 15-6: Xuxa Pit Final Optimization Ore and Waste

 

Xuxa Pit Ore, Waste and Stripping Ratio
Classification Tonnage (Mt) Li2O (%)
Ore 11.8 1.55
Waste 195.4  
Stripping Ratio 16.6:1  

 

21501-REP-PM-001
Page | 238

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

 

Figure 15-12: Xuxa Final Optimized Pit Design

 

21501-REP-PM-001
Page | 239

 

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

15.5Xuxa Mineral Reserves Statement

 

The Mineral Reserves are shown in Table 15-8 and were estimated by GE21’s Porfirio Cabaleiro Rodriguez, a Qualified Person under NI 43-101 and a Fellow of the Australian Institute of Geoscientists.

 

Table 15-7: Xuxa Mineral Reserves

 

Sigma FS Xuxa

 

5 x 3 x 5 (m) Block Dimensions

 

97% Mine Recovery, 3.75% Dilution

 

(Effective date: 6/26/2021)

Classification Tonnage (Mt) Li2O(%) LCE(Kt)
Proven 8.34 1.55 319.7
Probable 3.46 1.54 131.8
Total 11.80 1.55 451.5

 

Notes to accompany Mineral Resource table

 

1.Mineral Reserves were estimated using Geovia Whittle 4.3 software and following the economic parameters listed below:

 

2.Sale price for Lithium concentrate at 6% Li2O = US$1,500/t concentrate FOB mine gate.

 

3.Exchange rate US$1.00 = R$5.00.

 

4.Mining costs: US$2.20/t mined.

 

5.Processing costs: US$10.70/t ore milled.

 

6.G&A: US$4.00/t ROM (run of mine).

 

7.Mineral Reserves are the economic portion of the Measured and Indicated Mineral Resources.

 

8.82.5% Mine Recovery and 3.75% Mine Dilution

 

9.Final slope angle: 34° to 72° based on geotechnical considerations presented in Section 16.

 

10.Inferred Mineral Resources within the Final Operational Pit totals 0.68 Mt grading 1.52% Li2O. The Inferred Mineral Resources are not included in the Mineral Reserves.

 

11.Strip Ratio = 16.6 t/t (waste+Inferred mineral resource)/mineral reserve.

 

12.The Qualified Person for the estimate is Porfírio Cabaleiro Rodriguez, BSc. (MEng), FAIG, an employee of GE21.

21501-REP-PM-001
Page | 240

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

15.6Barreiro Mineral Reserves

 

The Barreiro Deposit will be mined by conventional open pit mining methods for a twelve-year mine life, at a plant feed rate of 1.80 Mtpy, with Mineral Reserves totalling 21.8 Mt grading 1.36% Li2O (lithium oxide), based on a long-term lithium spodumene selling price of US$1,500/t concentrate FOB Mine

 

The effective date for the Mineral Reserve Estimate is February 11, 2022. A CIM-compliant Mineral Resource Estimate, from which this reserve was calculated, was completed by SGS Canada in 2022 as documented in section 14 of this report.

 

Development of the LOM (life of mine) plan includes pit optimization, pit design, mine scheduling and the application of modifying factors, economic and metallurgical, of the Measured and Indicated Mineral Resources. The basis on which Mineral Reserves are defined is the point where mined ore is delivered to the primary crusher. The tonnages and grades reported are inclusive of geological losses, mining recovery and mining dilution.

 

The Mineral Reserves for the open pit aspects of the Barreiro Deposit were prepared by Porfirio Cabaleiro Rodriguez, FAIG., Senior Mining Engineer with GE21, a Qualified Person (QP) as defined under National Instrument 43-101 regulations.

 

The Mineral Reserve for the Barreiro Deposit was based on a diluted and recoverable block model built over the Mineral Resource block model. A pit design was developed based upon operational and reliable parameters, resulting in a mine life of twelve years.

 

The Mineral Reserve Estimate has been developed using best practices in accordance with the 2019 CIM guidelines and National Instrument 43-101 reporting.

 

The QP is of the opinion that no known risks including legal, political or environmental, would materially affect potential development of the Mineral Reserve, except for those risks discussed in this Report.

 

Table 15-14 presents the Mineral Reserves that have been estimated for the Barreiro Project, which include 16.93 Mt of Proven Mineral Reserves at an average grade of 1.38% Li2O and 4.83 Mt of Probable Mineral Reserves at an average grade of 1.29% Li2O for a total of 21.76 Mt of Proven and Probable Mineral Reserves at an average grade of 1.36% Li2O. In order to access these Mineral Reserves, 271.37 Mt of waste rock must be mined, resulting in a strip ratio of 12.5:1 t/t.

 

The final pit and the mine planning were based on a pit optimization using Whittle software. The mining plan developed in this report is based on Measured and Indicated Mineral Resources only. There is a low geological confidence associated with Inferred Mineral Resources, and there is no certainty that further exploration work will result in the Inferred Mineral Resources becoming Indicated Mineral Resources.

 

Mineral Reserves are an estimate of the grade and tonnage of measured and indicated mineral resources that can be economically mined and processed. For the Project, Mineral Reserve estimation used open-pit mining methods as this was assumed to be the most economic mining method for the Barreiro Deposit.

21501-REP-PM-001
Page | 241

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

Figure 15-13 presents a general layout of the Barreiro mine site.

 

 

Figure 15-13: Final Barreiro Mine Configuration

 

15.7Barreiro Pit Optimization Parameters

 

The technical and economic parameters listed in Table 15-8 were used to generate the optimal pit, which consists of a pit that maximizes the project economic value, as obtained by applying the Lerchs-Grossman algorithm implemented by the Geovia Whittle software program.

 

The classic methodology for the selection of the optimal pit consists of generating a set of nested pits from the application of revenue factors. The factor is applied to the sale price of the commercial product, resulting in a mathematical pit for each factor applied. The resulting generated pits are analyzed to define the final optimal pit for the deposit.

 

Table 15-8: Technical and Economic Parameters Used in the Final Barreiro Pit Optimization

 

Item Unit Value
Revenue Sales Price US$/t conc.* $1500
Ore Density g/cm³ Block model
Grade % Li2O Block model
Mining Mine Recovering % Block model
Dilution Block model
Block Model Dimensions Block Dimensions Unit value
X x Y x Z m 5 x 5 x 5
General Angle Overburden º

Sectors 1, 2, 4 & 5 – 35º

Sector 3 – 37º

Fresh Rock

Sectors 1, 2, 4 & 5 – 55º

Sector 3 – 52º

Processing Metallurgical Recovery** % 60.0
Mass Recovery*** % Calculated in block
Concentrated Grade % Li2O 6.0
Cut-off % Li2O 0.5
Costs Mining US$/t mined $2.20 (Ore)/$1.88 (Waste)
Processing US$/t ore $10.70
G&A (Adjusted for OPEX) $4.00
Sale (2% cost of sale) US$/t product $14.66
  Royalties (CFEM 2%) $14.66

Note: * conc. = concentrate, ** based on DMS Tests, *** Including 15% fines losses

21501-REP-PM-001
Page | 242

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

15.7.1Physical Parameters

 

The information relative to the physical aspects and restrictions that were used for the open pit designs and Mineral Reserve Estimate included the topographic surface, the geological block model, and the rock type properties for ore, waste and overburden.

 

The mine planning work carried out for the Feasibility Study Update was performed using Geovia MineSched 2020 software.

 

15.7.1.1Topographic Surface

 

The mine design was based on a topographic surface based on 1 m contour intervals. The contours were supplied by Sigma and derived from a drone topographic survey that took place on June 29, 2021.

21501-REP-PM-001
Page | 243

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

15.7.1.2Geotechnical Parameters

 

Figure 15-14 shows the five geotechnical sectors for the optimized Barreiro pit presented in this preliminary feasibility study. The red lines represent the limits for the sectors within the pit shell. The pit slope angles used are listed in Table 15-9.

 

 

Figure 15-14: Barreiro Pit Geotechnical Sectors

 

Table 15-9: Barreiro Geotechnical Pit Slope Design Criteria

 

Sectors Face
Angle (º)
Berm Width
(m)
Bench
Height (m)
Inter-Ramp
Slopes Angle (º)
01 - Overburden 55 6 10 37.6
01 - Fresh Rock 84 6 10 55
02 - Overburden 55 6 10 37.6
02 - Fresh Rock 84 6 10 55
03 - Overburden 47 6 10 33.7
03 - Fresh Rock 75 5 10 52
04 - Overburden 55 6 10 37.6
04 - Fresh Rock 84 6 10 55
05 - Overburden 55 6 10 37.6
05 - Fresh Rock 84 6 10 55

21501-REP-PM-001
Page | 244

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

The geotechnical and hydrogeological parameters used in the open-pit design are defined in Section 16.1 – Geotechnical and Hydrogeological Analysis.

 

15.7.1.3Rock Type Properties

 

The rock type properties are outlined below. Rock properties are important in estimating the Mineral Reserves, the equipment fleet requirements, as well as the waste dump and stockpile design capacities.

 

15.7.1.3.1Density

 

The in-situ dry density of the mineralized material is estimated to be 2.72 t/m³. A density of 2.76 t/m³ has been used for schist waste rock and a density of 1.61 t/m³ for overburden.

 

15.7.1.3.2Swell Factor

 

An average swell factor of 30% and a compaction factor of 15% were estimated for the in-situ material transported to the waste dump. These factors were used to define waste dump volumes.

 

15.7.1.3.3Moisture Content

 

A general moisture content factor of 5% was estimated for in-situ rock material. The final fleet sizing was provided by a mining contractor who will carry out mining activities during the life of the mining operation. This factor was used to define fleet sizing.

 

15.7.1.4Mineral Resource Block Model

 

The Mineral Resource block model provided by SGS Canada (described in section 14) was the base used by GE21 to build the Mineral Reserve block model.

 

15.8Barreiro Modifying Factors

 

The modifying factors listed in the Sections below were applied to convert the Mineral Resources into Mineral Reserves for the pit optimization analysis and the open pit design.

 

15.8.1Economic and Metallurgical Factors

 

15.8.1.1Long-Term Concentrate Price

 

A long-term sale price of US$1,500/t concentrate FOB Mine for spodumene (6% Li2O) was used, based on market studies provided by Sigma.

 

15.8.1.2Cut-Off Grade

 

A cut-off grade of 0.5% Li2O as defined for the Mineral Resource Estimate.

 

15.8.1.3Metallurgical Factors

 

An overall metallurgic recovery of 60.0% for a dense media separation (DMS) operation was used for metallurgical recovery, with a concentrate grade of 6% Li2O, resulting in a calculated mass recovery, after allowing for fines losses of 15%, block by block of mined ore by the formula:

  

                

21501-REP-PM-001
Page | 245

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

15.8.1.4Mining and Processing Cost Factors

  

Optimization economics used a mining cost of US$2.20/t mined and a processing cost of US$10.7/t ore, based on a proposal from a Brazilian mining contractor.

 

15.8.1.5Other Costs

 

The cost assumptions also included US$4.00/t ore for G&A expenses, and royalties at 2% of the concentrate price (US$14.66/t concentrate).

 

15.8.2Selective Mining Unit (SMU) Selection

 

The conventional definition of the selective mining unit (SMU) is the smallest volume of material on which ore/waste classification is determined.

 

In order to determine the optimal SMU for Xuxa, GE21 analyzed a number of block dimension alternatives, ranging in size from 20 m x 20 m x 5 m (x, y, z) to 5 m x 5 m x 2.5 m (x, y, z). Isastis software was used to perform a uniform conditioning simulation on the various SMU alternatives using Li2O% as the estimated variable.

 

Figure 15-15 shows the results of the uniform conditioning estimate.

 

Based on the analysis, GE21 determined that an SMU of 5 m x 5 m x 5 m was suitable.

 

 

Figure 15-15: Barreiro Grade x Tonnage Curve with Selectivity Results Based on Local Uniform Conditioning Estimate

 

15.8.3Dilution and Loss Estimate

 

Once the SMU was defined and a grade control procedure established, GE21 prepared a diluted block model to be used in mine planning. The main assumptions adopted by GE21 were:

 

·Considering the fact that the grade control drill hole can only be checked every metre, a pegmatite bounding envelope was created based on the one-metre-wide edge, as shown in Figure 15-16.

21501-REP-PM-001
Page | 246

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

·The blocks within the enclosed envelope, the pegmatite bounding envelope, were classified as waste. The schematic diagram in Figure 15-17 represents the partial effect of this assumption on the blocks near the end face of the bench.

 

·For the blocks still within the remaining pegmatite solid, a maximum 3% of operational dilution was allowed, as shown in the dilution parameterization curve in Figure 15-18 below.

 

·GE21 has considered accepting blocks at the edge of the fixed pegmatitic wireframe structure with a minimum 61% of ore on the block.

 

An overall 3% mean dilution was assumed for the diluted pegmatite, as shown in the Table 15-10 below, resulting in a mining recovery equivalent to 95% relative to a partial model in the original resource model.

 

 

Figure 15-16: Cross-Section Showing the Original Pegmatite (brown line) and the One Reduced At 1 M from the Edge (white line).
Blocks are Coloured Blue to Red in Relation to their Partial Percentage within the Reduced Solid (Blue = 0%, Red = 100%)

21501-REP-PM-001
Page | 247

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 15-10: Barreiro Dilution Analysis

 

Source Partial
Percent
Cut
Total
Mass
After
Cut (Mt)
Average
Partial
Percentage
Total
Resource
on Source
(Mt)
Mining
Recovery
Resource Model - - - 29.6 100%
Undiluted Model (1) 0.61 27.9 (2) 0.97 29.4 95%

(1)Resource restricted within pegmatite model.

(2)whole blocks including dilution model

 

 

Figure 15-17: Schematic Representation of the Dilution Analysis

21501-REP-PM-001
Page | 248

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 15-18: Barreiro Tonnage vs Partial Percentage Curves

 

GE21 intends to use the 61% cut-off on the partial percentage of pegmatite, representing an effective 95% mining recovery, keeping a 3% dilution rate, on the pit optimisation phase.

 

15.9Barreiro Pit Optimization Study

 

The pit optimization was based on:

 

·Definition of economic and geometric parameters, cut-off grade, and physical restrictions.

 

·Modified Mineral Resource Block Model to include the modified factors.

 

·Definition of an optimal pit using Geovia Whittle 4.3 software.

 

·The selection of the optimum pit, based on a strip ratio limit, and allowance for a mine life long enough to support a positive cash flow.

 

The technical and economic parameters listed in Table 15-8 were used to generate the optimal pit, which consists of a pit that maximizes the project economic value, as obtained by applying the Lerchs-Grossman algorithm implemented by the Geovia Whittle software program.

 

The optimal pit sequence was obtained by varying the revenue factor in a range from 30% to 200% of the base product selling price. In order to determine the evolution of the pits over time, an annual production rate of 1.8 Mtpa of ore feed was established at an annual discount rate of 10%. Table 15-11, and Figure 15-9 present the pit optimization parameters and shows the evolution of the resulting optimization pushbacks with the chosen optimal pit highlighted.

21501-REP-PM-001
Page | 249

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 15-11: Barreiro Nested Pit Optimization Results

 

Pit Revenue Factor Ore Waste Total
Movement
Waste-Ore
Ratio
Li2O
(Mt) (Mt) (Mt) t/t %
1 30% 20.60 179.64 200.23 8.72 1.41
2 40% 22.15 210.62 232.78 9.51 1.41
3 50% 22.76 227.01 249.77 9.97 1.40
4 60% 23.19 241.49 264.68 10.41 1.40
5 70% 23.42 250.10 273.52 10.68 1.39
6 80% 23.52 254.24 277.76 10.81 1.39
7 90% 23.56 256.73 280.29 10.90 1.39
8 100% 23.59 258.75 282.34 10.97 1.39
9 110% 23.63 260.63 284.25 11.03 1.39
10 120% 23.64 261.87 285.51 11.08 1.39
11 130% 23.65 263.49 287.14 11.14 1.39
12 140% 23.66 264.18 287.85 11.16 1.39
13 150% 23.67 264.60 288.27 11.18 1.39
14 160% 23.68 265.58 289.26 11.22 1.39
15 170% 23.68 266.37 290.05 11.25 1.39
16 180% 23.69 267.26 290.95 11.28 1.39
17 190% 23.69 267.87 291.57 11.30 1.39
18 200% 23.70 268.14 291.83 11.32 1.39

 

 

Figure 15-19: Barreiro Nested Pit Tonnage and NPV

 

GE21 performed a series of pit optimization scenarios considering sales prices of lithium concentrate @6% ranging from US$450 (Pit 1) to US$1,500 (Base Case – Pit 8). It was observed that the sales price above US$1,050/t conc (Pit 5), relative at a Revenue Factor of 70%, does not demonstrate any significant gain in the optimization results (ore tonnage). For this reason and representing lower risk, Pit 5 was selected to serve as the basis for the pit design.

21501-REP-PM-001
Page | 250

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

15.9.1Mine Design

 

Mine design comprises the design of an operational pit, including ramps, berms, and access over the life of the selected optimal pit shell, and recovery of the Mineral Reserves in an operationally feasible design.

 

The methodology consists of tracing the benches, toe and crest outline, safety berms, construction sites, and access ramps, while respecting the geometric and geotechnical parameters defined by geotechnical and hydrogeological studies. The assumptions adopted for the operationalization of the final pit were:

 

·Minimize ore mass loss.

·Define access routes for shorter average transport distances.

 

Table 15-12 presents the geometric parameters adopted to develop the mine design and Figure 15-20 presents the pit wall configuration based on those parameters.

 

Table 15-12: Barreiro Open Pit Operational Design Parameters

 

Final Pit Operational Parameters
Parameters Value Unit
Bench Height 10 metres
Overburden Face Angle – Sector 01 55 º
Berm Width - Sector 01 6 metres
Face Angle - Sector 02  55 º
Berm Width – Sector 02 6 metres
Face Angle – Sector 03 47 º
Berm Width - Sector 03 6 metres
Face Angle – Sector 04 55 º
Berm Width - Sector 04 6 metres
Face Angle – Sector 05 55 º
Berm Width - Sector 05 6 metres
Fresh Rock Face Angle – Sector 01 84 º
Berm Width - Sector 01 6 metres
Face Angle - Sector 02  84 º
Berm Width – Sector 02 6 metres
Face Angle – Sector 03 75 º
Berm Width - Sector 03 6 metres
Face Angle – Sector 04 84 º
Berm Width - Sector 04 6 metres
Face Angle – Sector 05 84 º
Berm Width - Sector 05 6 metres
Access Ramps Width 12.0 metres
Access Ramps Inclination 10.0 %

21501-REP-PM-001
Page | 251

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 15-20: Barreiro Pit Wall Configuration

 

A fleet of conventional road trucks is planned to transport ore and waste rock. The width of the access road to the final pit was designed at 12 m. Within the pit, the road has a running surface of 10 m for trucks and a total width of 12 m (Figure 15-21). For mining the lower benches, which mainly consist of mineralized material, the width of the road was reduced to 6 m.

 

Figure 15-22 shows the final design of the operational pit and Table 15-13 shows the total ore and waste expected to be mined.

 

The final commissioned pit would contain 21.8 Mt of ore and 271.4 Mt of waste, including Inferred Mineral Resources, with a 12.5:1 strip-ratio, and a mine life of approximately 12 years.

 

 

Figure 15-21: Barreiro Pit Ramp Design

21501-REP-PM-001
Page | 252

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 15-13: Barreiro Pit Final Optimization Ore and Waste

 


Barreiro Pit Ore, Waste and Stripping Ratio

 

Classification Tonnage (Mt) Li2O (%)
Ore 21.8 1.36
Waste 271.4  
Stripping Ratio 12.5:1  

  

 

 

Figure 15-22: Barreiro Final Operational Pit Design

21501-REP-PM-001
Page | 253

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

15.10Barreiro Mineral Reserves Statement

 

The Mineral Reserves shown in Table 15-14 were estimated by GE21’s Porfirio Cabaleiro Rodriguez, a Qualified Person under NI 43-101 and a Fellow of the Australian Institute of Geoscientists.

 

Table 15-14: Barreiro Mineral Reserves

 

Sigma PFS Barreiro

 

5 x 5 x 5 (m) Block Dimensions

 

97% Mine Recovery, 3.00% Dilution

 

(Effective date: 2/24/2022)

Classification Tonnage (Mt) Li2O(%) LCE(Kt)
Proven 16.93 1.38 576.8
Probable 4.83 1.29 153.1
Total 21.76 1.36 729.9

 

Notes to accompany Mineral Resource table

 

1.Mineral Reserves were estimated using Geovia Whittle 4.3 software and following the economic parameters listed below:

 

2.Sale price for Lithium concentrate at 6% Li2O = US$1,500/t concentrate FOB Mine.

 

3.Exchange rate US$1.00 = R$5.00.

 

4.Mining costs: US$2.19/t mined.

 

5.Processing costs: US$10.7/t ore milled.

 

6.G&A: US$4.00/t ROM (run of mine).

 

7.Mineral Reserves are the economic portion of the Measured and Indicated Mineral Resources.

 

8.95% Mine Recovery and 3% Mine Dilution

 

9.Final slope angle: 35° to 55° based on Geotechnical Document presented in Section 16.

 

10.Inferred Mineral Resources with the Final Operational Pit is 0.59 Mt grading at 1.32% Li2O. The Inferred Mineral Resources are not included in the Mineral Reserves.

 

11.Strip Ratio = 12.5 t/t (waste+Inferred mineral resource)/mineral reserve.

 

12.The Competent Person for the estimate is Porfírio Cabaleiro Rodriguez, BSc. (MEng), FAIG, an employee of GE21.

21501-REP-PM-001
Page | 254

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

16MINING METHODS

 

16.1Xuxa Open Pit Mining

 

The Xuxa Deposit will be mined by open pit mining methods, using a contracted mining fleet consisting of hydraulic excavators, front loaders, and 40 t transport trucks for waste and ore, coupled with appropriate auxiliary support equipment.

 

16.1.1Geotechnical and Hydrogeological Analysis

 

16.1.1.1Geotechnical

 

A geotechnical field study, analysis and design was performed to provide key pit design parameters for the Xuxa North and South pits.

 

Data analysis is supported by a comprehensive investigation and geotechnical assessment of the drill hole samples, and laboratory tests consisting of uniaxial compressive testing (UCS), triaxial testing, indirect tensile strength testing (Brazilian test), and direct shear strength testing. The stability analyses led to the recommendation of inclination angles for the pit walls which are considered to be prudent and within appropriate safety factors. The stability analyses considered information on the strength parameters of various rock and soil materials, in association with the understanding of the expected rupture mechanisms that could occur on the pit slopes.

 

The kinematic analysis in the most critical portion of the pit indicates a 9% probability of planar rupture due to schistosity, as shown in Figure 16-1, which is in accordance with good mining practices that allow up to a 30% probability.

 

 

Figure 16-1: Kinematic Analysis of Sector A, Xuxa North Pit

 

The stability analysis of sectors A and C indicate that the pit slopes are stable, even using conservative parameters. Figure 16-2 and Figure 16-3 show the analyses with safety factors above the minimum permitted for open-pit mines, which is a factor of safety FS = 1.30.

21501-REP-PM-001
Page | 255

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

 

Figure 16-2: Xuxa North Pit, Sector A Stability Analysis, FS=1.47

 

 

Figure 16-3: Xuxa North Pit, Sector C Stability Analysis, FS=1.56

 

Based on the stability analyses, the sectorization corresponding to the face angle, berm width, and inter-ramp angle was performed, as illustrated in Figure 16-4 and summarized in Table 16-1.

 

The criteria applied to the final operational pit design was discussed extensively among Sigma and GE21 engineers to determine the best approach for Mineral Reserve risk assessment. The confidence level related to a feasibility study and rules from Brazilian Mining Agency (ANM) were also considered in the discussions.

21501-REP-PM-001
Page | 256

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 16-4: Xuxa North and South Pits with Geotechnical Sectors

 

Table 16-1: Xuxa Geotechnical Slope Results Designed Pit

 

Sectors

Face Angle
(°)

Berm Width
(m)

Bench Height
(m)

Angle between Ramps /
Overall
(°)

A 60 6 20 48 / 46
B 82 6 20 66 / 61
C 82 6 20 67 / 62
D 82 6 20 66 / 61
E 82 6 20 66 / 61
F 60 6 20 48 / 48
G 82 6 20 66 / 59
H 82 6 20 66 / 61
I 82 6 20 66 / 59

 

16.1.1.2Hydrogeology

 

A hydrogeological study, consisting of fieldwork, mathematical modeling, studies of regional water characteristics, and the potential impacts on Xuxa open pit mining, was performed.

21501-REP-PM-001
Page | 257

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

A complementary campaign of geotechnical oriented drill holes and pressurized water loss tests (Packer Test) was carried out to measure the hydraulic conductivity of the rock mass, the hydrogeological characterization of the operation site, and to assess the likelihood of groundwater inflow from Piaui River into the North and South Xuxa pits.

 

Figure 16-5 presents a conceptual model of regional groundwater circulation. In this area, the primary permeability is very low, therefore, aquifers in a fractured environment predominate. The recharge takes place through the fracture system, which also controls surface drainage. Discharge from these fractured aquifers occurs predominantly at the bottom of valleys.

 

 

Figure 16-5: Regional Hydrogeological Conceptual Model

 

The Project area is located in a semi-arid region with average annual rainfall between 620 and 720 mm. The annual water deficit is 800 mm which implies a low ratio of aquifer recharge throughout the year.

 

The Project is located in the geomorphological portion of the Salinas Formation schist rocks, with an undulating topography. The hydrogeological characteristics of the Salinas Formation are exclusive fractured aquifers with a small contribution from the granular medium in its altered portion, if it is of reasonable thickness.

 

The Project is located in the Piaui River sub-basin, which acts as intermittent drainage, being a right bank tributary to the Jequitinhonha River (Figure 16-6).

21501-REP-PM-001
Page | 258

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 16-6: Xuxa North and South Pits Separated by Piaui River

 

The water test sampling in the area covered by the project area was carried out between 11 January 2021 and 13 January 2021. All drainages with connections to the Piaui River were visited, and no surface water was identified. All drainage systems were found to be dry. The conclusion is that these trenches are purely drainage for rainwater with no springs existing in the area from an underground aquifer.

 

Data on physical-chemical water parameters (pH, EH, conductivity, temperature) were collected from several points along the Piaui River. The average measurement shows a 7.8 pH in the Piaui River within the project area, an important parameter that clearly indicates rainwater without any acidic water characteristics. The average electrical conductivity measured at Piaui River is 54.3 µS. This extremely low value demonstrates that the water, although muddy in appearance, has very little suspended solids. The water grade of dissolved solids is extremely low, with an average of 27.4 ppm, which gives the water a low electrical conductivity, an important parameter to analyze the origin of water when related to pH. The average obtained from the measurements was 217.9 mv, and this positive value indicates fast circulating water and an oxidizing environment typical of rainwater. The average water temperature of the Piaui River in the project area was 28.9 °C.

21501-REP-PM-001
Page | 259

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Figure 16-7 presents the potentiometric map of the pit region. There is an extensive area in which the water surface appears as if it were tabular and regulated by the water of Piaui River.

 

 

Figure 16-7: Potentiometric Map of the Xuxa Pit Region

 

Some unobstructed drill-holes were selected for the installation of dual-chamber piezometers (Casagrande type), the first being located in altered and compact schist, and the second above the contact of the altered schist with the unaltered schist. A total of 12 piezometers were installed on the Property. Table 16-2 shows the piezometer locations, the measured and observed water levels, the expected and calculated water levels, and the difference between them, observed minus calculated values.

21501-REP-PM-001
Page | 260

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 16-2: Xuxa Piezometer Locations and Results

 

Instrument UTM Coordinates Water Level (m)
E-W N-S Obs. Calc. Obs-Calc.
PZ01/A 190837 8147133 254.8 254.9 0.1
PZ02/A 190515 8147060 263.0 255.6 -7.4
PZ03/A 190273 8146894 257.1 255.8 -1.3
PZ04/A 190660 8147179 254.0 255.1 1.1
PZ05/A 190531 8146895 256.6 256.4 -0.2
PZ06/A 190537 8146788 260.5 256.6 -3.9
PZ08/A 189962 8146524 257.5 256.6 -0.9
PZ09/A 190250 8146643 257.7 255.8 -1.9
PZ10/A 189710 8145931 258.2 258.5 0.3
PZ11/A 189782 8146230 259.0 258.1 -0.9
PZ12/A 190174 8146496 255.3 256.4 1.1
PZ13/A 190061 8146389 246.1 257.1 11.0

 

Data on water levels and water samples were collected for hydrogeochemical characterization, emphasizing that the water found in the holes initially had muddy characteristics.

 

In addition to the water levels being measured monthly in the drill holes, two monthly streamflow measurements were carried out downstream and upstream of the Project area in the Piaui River, starting in February 2021, during the rainy seasons. Considering the piezometer results, which include both rainy and dry seasons, with the results which were unaffected by the losses and gains of the streamflow, it can be concluded that these are independent systems. Piezometry does not reflect the variations detected in the river, leading us to conclude that the Piaui River exerts a great influence on the maintenance of water levels in the shallow granular aquifer that flows along the Piaui River drainage, located between elevation 255 m asl and 250 m asl.

 

Tests were performed in the installed piezometers to determine the hydraulic conductivity (slug test). The results of the slug test tests were consistent with the expectations for an aquifer with low fracture and mean rock quality designation of RQD >91. The variations presented are directly linked to depth and are discussed in section 16.1.3. Test results measured the average conductivity for the rock mass which is around 10-4 m/day.

 

In addition to the tests carried out in the piezometers to determine the conductivity, water loss tests (packer test) were also carried out in 6 holes contained within the area of the proposed Xuxa pits. Overall, test results showed that rock fractures have very low to low specific losses, giving them a virtually tight rock classification.

 

16.1.1.3Mathematical Model

 

The mathematical model, in its third version, was developed and calibrated based on the conceptual hydrogeological model, which considered three independent systems:

 

A fractured system composed of schists and pegmatites with low conductivity and decreasing depth of regional water flow

 

A granular system composed of soil and schist saprolite superimposed on the fractured system, with high conductivity, variable thickness, and seasonal flow depending on rainfall input, and

21501-REP-PM-001
Page | 261

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

An isolated granular system located in the Piaui River channel, with high conductivity, variable thickness and width, and seasonal flow depending on rainfall input.

 

For the numerical modelling of the groundwater flow, the MODFLOW program was adopted, which works with the finite difference method of modelling. The software used was “Visual Modflow”, version 4.6.0.166. The matrix solver WHS (Preconditioned-Conjugate Gradient Stabilized) was used. The model was calibrated in a steady state with the existing data. The groundwater level drawdown was then simulated in a transient state according to the annual mining plan.

 

Based on the permeability tests carried out in the region (slug test), decreased hydraulic conductivity (K) was verified according to the depth. Thus, a different K-value was adopted for each layer of the numerical model. In general, a conservative position was taken, using values slightly higher than those obtained in the tests.

 

Figure 16-8 shows the RQD inversely proportional to the hydraulic conductivity (K).

 

The lowest RQD values are found to be closer to the surface. At depths below the pit depth, the RQD approaches 100%, indicating a virtually null hydraulic conductivity.

 

 

Figure 16-8: Relationship between RQD and Depth Evaluated in the Block Model for the Proposed Pits

21501-REP-PM-001
Page | 262

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 16-3 presents the numerical values of the K variation, according to the numerical model layer for the position of the piezometer PZ03.

 

Table 16-3: Variation of Hydraulic Conductivity and Storage According to Depth

 

 

A comparison between the calculated values of K from permeability tests with the values adopted in the numerical model is presented in Table 16-4. The table shows actual K test data, calculated data and adopted data. The numerical model adopted a general trend of K values, seeking a conservative position.

 

Table 16-4: Comparison between Calculated and Adopted Values of K

 

Instrument Prof.
Chamber
Numerical Model
Layer
Calculated K
(m/day)
Adopted K
(m) GE21 (m/day)
PZ01 78 to 90 5 - 1.50E-03
PZ02 102 to 120 6 - 5.00E-04
PZ03 46 to 52 4 7.49E-03 5.00E-03
PZ04 76 to 94 5 - 1.50E-03
PZ05 61 to 79 5 3.80E-04 1.50E-03
PZ06 114 to 135 7 1.87E-05 1.50E-04
PZ07 30 to 36 3 0.00629 1.50E-02
PZ08 48 to 60 5 1.04E-01 5.00E-02
PZ09 53 to 65 5 6.89E-03 1.50E-03
PZ10 33 to 45 4 5.21E-05 5.00E-03
PZ11 107 to 119 6 2.80E-02 5.00E-04
PZ12 47 to 53 4 1.02E-01 5.00E-02
PZ13 65 to 75 5 4.32E-05 1.50E-03

 

The boundary conditions used in this numerical model were: zero-flow, recharge, river, and deep aquifer continuity (General Head Boundaries - GHB). An active flow was only considered in the Piaui River basin, with a zero-flow being adopted throughout this basin. The hydraulic load (level) was defined according to land topography, with a water depth of 1 metre and a conductance of 1,000 m/day. Drainage is between levels 255 m and 250 m asl elevation.

21501-REP-PM-001
Page | 263

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

The recharge values were obtained through back analysis of the numerical model during the steady-state calibration step. Thus, 1x10-6 m/day was defined as the value for the entire modeled area. This is a very-low value, which is compatible with the existing hydric deficit in the region where evaporation exceeds rainfall.

 

Figure 16-9 shows the steady-state calibration graph of calculated versus observed values. In this graph, the instrument results are plotted with the observed values on the x-axis and the calculated values on the y-axis. The closer the results plot to the central line, the better the model’s calibration. Table 16-5 shows the statistical values from the graph. The results provide confidence in the mathematical model developed.

 

 

Figure 16-9: Steady-State Calibration Graph of Calculated vs Observed Head Values

 

Table 16-5: Calibration Parameters for Calculated vs Observed Head Values

 

Calibration Parameters
Number of points 9
Residual error -0.296 m
Absolute residual error 0.846 m
Estimate standard error 0.34 m
Mean square root of error 1.007 m
Normalized error (RMS) 20.14%
Correlation coefficient 0.793

 

16.1.1.4Results

 

The main result obtained from the simulation refers to the pits dewatering streamflow. This streamflow is obtained through the numerical model by verifying the calculated streamflow for the drainage model used in the water level drawdown

21501-REP-PM-001
Page | 264

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 16-6 presents the levels reached by the drawdown in the simulated period in the North and South pits. Table 16-7 presents the individual pit results and the yearly streamflow.

 

Table 16-6: Xuxa Water Levels Reached in the Drawdown Numerical Model Simulation

 

 

Table 16-7: Simulated Dewatering Streamflow (Annual Average)

 

  Flow in m3/h
Year North Pit South Pit Total
Year 01 0 0 0
Year 02 11.5 0 11.5
Year 03 14.6 0 14.6
Year 04 11.6 3.3 14.9
Year 05 10.5 15.5 26.0
Year 06 10.4 12.1 22.5
Year 07 10.0 9.2 19.2
Year 08 8.0 10.6 18.6
Year 09 6.4 9.2 15.5
Average 9.2 6.6 15.9

 

As shown by the data, the average dewatering streamflow is around 16 m3/h, with a maximum of 26 m3/h.

 

Figure 16-10 presents the equipotential of the layer-5 water level from the numerical model to the simulated final status. A direction of water flow is observed around and moving towards the pits, converging at them.

 

It is concluded that there is limited local water availability as an alternative source for water collection. The values obtained in the modelling are conservative and maximized to ensure operational safety and slope stability.

 

According to the result obtained in the drawdown simulation of the final pit, the pit dewatering streamflow is low, totalling about 16 m3/h on average. This value will be easily managed by the mine operation in the dry season, through small drainage channels located before entering the pit and through sump-type structures at the pit entrance.

 

According to the simulation, quantitative interference in local water availability is not expected. Even by adding rain volume to the simulation, the operational situation for dewatering is manageable and was not found to be a concern for the development of the pits, as well as the for the stability of the pit slopes.

21501-REP-PM-001
Page | 265

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Effects such as the inversion of water flow from the Piaui River to the interior of the pit are not expected according to the conceptual model. No increase in streamflow rate due to blasting is anticipated.

 

 

Figure 16-10: Equipotential Surface of Groundwater Level in Year-9 Simulation Plan

 

16.2Xuxa Mine Sequencing

 

In order to define the annual production plan, the following criteria were applied:

 

Feed rate 1.50 Mtpa.

 

Li2O feed grade: 1.56%.

 

3.75% dilution rate.

 

Mining recovery: 97%.

 

Fines losses: 15%.

 

DMS metallurgical recovery: 60.4%.

21501-REP-PM-001
Page | 266

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Concentrate grade (Li2O): 6%.

 

Product mass recovery

 

This study consisted of sequencing production, the definition of waste and ore, and the mining sequence of the waste rock blocks, in addition to the evolution of pit(s) geometries throughout the mine life.

 

One pre-stripping phase was considered for the mine as mining development.

 

For the production development, the areas to be mined annually were established, generating operational plans for years 1 to 8.

 

Operational sequencing results can be found in Figure 16-11 to Figure 16-18 and Table 16-8 below. Table 16-9 presents sequencing details not operationalized for the period.

 

Table 16-8: Xuxa Designed Mine Sequencing

 

Year Classification ROM ROM
(Mt)
Li2O
Partial
Waste Waste Pre-
Stripping
Total
Waste
Stripping
Ratio
Total
Stripping
Ratio
(%) (t) (Mt) (Mt)
1 Proven 906,593 0.91 1.58            
Probable 593,326 0.59 1.53            
Subtotal 1,499,919 1.50 1.56 13,417,268 11.1 2.34 13.4 7.39 8.95
2 Proven 1,338,323 1.34 1.52            
Probable 167,873 0.17 1.36            
Subtotal 1,506,196 1.51 1.50 22,556,241 22.6   22.6 14.98 15.0
3 Proven 1,395,631 1.40 1.61            
Probable 68,648 0.07 1.66            
Subtotal 1,464,279 1.46 1.61 27,730,862 27.7   27.7 18.94 18.9
4 Proven 1,461,038 1.46 1.63            
Probable 24,706 0.02 1.58            
Subtotal 1,485,744 1.49 1.63 22,553,266 22.6   22.6 15.18 15.2
5 Proven 1,015,538 1.02 1.59            
Probable 491,063 0.49 1.69            
Subtotal 1,506,601 1.51 1.63 27,428,536 27.4   27.4 18.21 18.2
6 Proven 949,725 0.95 1.46            
Probable 503,415 0.50 1.67            
Subtotal 1,453,140 1.45 1.54 28,989,385 29.0   29.0 19.95 19.9
7 Proven 1,114,358 1.11 1.47            
Probable 365,918 0.37 1.60            
Subtotal 1,480,276 1.48 1.50 38,241,206 14.6 23.6 38.2 9.89 25.8
8 Proven 153,293 0.15 1.38       0.0    
Probable 1,248,413 1.25 1.42            
Subtotal 1,401,706 1.40 1.42 14,522,953 14.5   14.5 10.36 10.4
Grand Total 11,797,861 11.80 1.55       195.4   16.6

21501-REP-PM-001
Page | 267

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 16-9: Xuxa Non-Designed Mine Sequencing

 

  Schedule - XUXA -Year 1-8
             
  Period Total
ROM
Mt
Pre-
Stripping
Mt
Waste
Mt
Total Moved
Mt
%Li2O
Diluted
Y0 Period 006 - 012   2.34   2.34 -
Y1 Period 001 0.13   0.89 1.03 1.41
Period 002 0.13   0.90 1.03 1.52
Period 003 0.12   0.89 1.02 1.57
Period 004 0.13   0.90 1.03 1.46
Period 005 0.12   0.82 0.94 1.43
Period 006 0.12   0.84 0.96 1.54
Period 007 0.13   0.89 1.02 1.61
Period 008 0.13   0.87 0.99 1.66
Period 009 0.14   0.90 1.04 1.66
Period 010 0.13   0.89 1.02 1.70
Period 011 0.12   0.96 1.08 1.57
Period 012 0.10   0.99 1.09 1.64
Total 1.50   10.74 12.24 1.56
Y2 Period 001 0.12   1.94 2.05 1.45
Period 002 0.13   2.00 2.13 1.43
Period 003 0.13   1.80 1.92 1.56
Period 004 0.13   1.99 2.12 1.43
Period 005 0.12   1.85 1.97 1.57
Period 006 0.14   2.07 2.21 1.49
Period 007 0.11   1.83 1.94 1.57
Period 008 0.13   1.83 1.96 1.60
Period 009 0.12   1.74 1.86 1.31
Period 010 0.13   1.75 1.88 1.57
Period 011 0.12   1.81 1.93 1.49
Period 012 0.13   1.60 1.73 1.53
Total 1.51   22.21 23.72 1.50
Y3 Period 001 0.31   7.78 8.09 1.66
Period 002 0.35   6.68 7.03 1.65
Period 003 0.41   6.76 7.17 1.56
Period 004 0.40   6.28 6.68 1.59
Total 1.46   27.50 28.96 1.61
Y4 Period 001 0.34   7.88 8.22 1.65
Period 002 0.41   5.81 6.22 1.64
Period 003 0.36   5.81 6.16 1.67
Period 004 0.37   2.91 3.28 1.57
Total 1.49   22.40 23.89 1.63
Y5 Period 001 0.36   10.88 11.24 1.59
Period 002 0.37   6.94 7.31 1.65
Period 003 0.40   4.81 5.21 1.63
Period 004 0.37   4.68 5.05 1.66
Total 1.51   27.31 28.81 1.63
Y6 Yearly 1.45   28.90 30.35 1.54
Total 1.45   28.90 30.35 1.54
Y7 Yearly 1.43 23.60 15.25 40.28 1.50
Total 1.43 23.60 15.25 40.28 1.50
Y8 Yearly 1.40   15.10 16.50 1.55
Total 1.40   15.10 16.50 1.55

21501-REP-PM-001
Page | 268

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 16-11: Xuxa North and South Pits Year 1

21501-REP-PM-001
Page | 269

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 16-12: Xuxa North and South Pits Year 2

 

 

Figure 16-13: Xuxa North and South Pits Year 3

21501-REP-PM-001
Page | 270

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 16-14: Xuxa North and South Pits Year 4

  

 

Figure 16-15: Xuxa North and South Pits Year 5

21501-REP-PM-001
Page | 271

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 16-16: Xuxa North and South Pits Year 6

 

 

Figure 16-17: Xuxa North and South Pits Year 7

21501-REP-PM-001
Page | 272

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 16-18: Xuxa North and South Pits Year 8

 

16.3Xuxa Mine Fleet

 

At the Xuxa Mine, the mining operations will be carried out by a third-party contractor, with proven experience with similar sized operations in Brazil. In order to select the mining operations contractor, operational work technical specifications were compiled and forwarded to the companies for technical and commercial proposals. After selecting the company and signing a contract, the work of mobilization and construction of the construction site will begin immediately.

 

The run of mine (ROM) ore will be drilled, blasted, loaded and transported by trucks to the ROM pad, near to the primary crusher. The ore will be loaded by a wheel loader and fed into the primary crusher. The oversize material, >1000 mm, will be fragmented by a rockbreaker installed in the crusher protection grate. A minimum ore stockpile of around 30,000 t will be kept in the ROM yard, with the aim of stabilizing the supply of feed to the plant when the mine production rate decreases or stops. This also helps to maintain the mine’s ore production rate should the primary crusher have unscheduled production stops.

 

Ore below the cut-off grade will be blasted, loaded and transported to specifically delimited discharge points within the waste disposal piles.

 

The percentage of material drilled and blasted is expected to be:

 

Ore: 100%

 

Soil: 5%

 

Weathered rock (Saprolite): 30%

 

Fresh Rock: 100%.

21501-REP-PM-001
Page | 273

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

The main mining activities will be:

 

Digging or rock blasting of ore and waste

 

Excavation, loading and transport of ore and waste

 

Disposal of ore in the ROM yard and waste in the waste dump

 

Construction and maintenance of all internal accesses to the pit(s) and the waste dumps

 

Maintenance of the floor, drainage, coating and signaling of all access roads used in the operation

 

Implementation and maintenance of the mine’s surface drainage systems at access points to the mining operation, waste deposit, ore yard and other areas linked to mining operations

 

Execution of mine infrastructure services, such as: construction and maintenance of accesses to the mining areas, crusher, waste dump, workshops and offices, mine drainage services, access signaling, mine dewatering, etc.

 

Feeding the primary crusher at an average rate of 320 t/hour, per wheel loader

 

Build and maintain the operation support facilities (offices, workshops, cafeteria, living quarters, warehouses, changing rooms, bathrooms, septic tanks, environmental, health and safety emergency (HSE), explosive magazine, electrical and hydraulic installations and others, in strict accordance with the Brazilian environmental standards and labour laws.

 

16.3.1Equipment

 

For the execution of mining activities, the equipment used must be in full working order, always observing the technical standards necessary for the services to be carried out safely. The equipment must comply with the respective Maintenance and Inspection Plans, as well as carrying out scheduled shutdowns for preventive and predictive maintenance. The proposed equipment to be used in the Mine will have high operational reliability and provide comfort and safety to operators (Table 16-10).

21501-REP-PM-001
Page | 274

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 16-10: List of Main Equipment to be used in the Operation of the Xuxa Pits

 

Equipment Brand Model Capacity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity
Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8
Hydraulic drill Sandvik or Similar DP 1500 or Similar 4“ to 5.5” 4 10 12 10 12 13 15 7
Hydraulic drill Sandvik or Similar DX 800 or Similar 4“ to 5.5” 1 1 1 2 2 2 2 1
Excavator Liebherr or Similar R966 SME or Similar 70 t 0 3 4 3 3 4 6 3
Excavator Liebherr or Similar R944 CSME or Similar 45 t 2 5 5 5 6 4 5 2
Excavator Caterpillar or Similar 336D or Similar 35 t 2 2 2 2 2 2 2 2
Excavator Caterpillar or Similar 320D with Rock Drill Hammer or Similar 20 t 1 1 2 2 2 2 2 1
Wheel Loader Caterpillar or Similar 966H or Similar 18 t 2 2 2 2 2 2 2 2
Bulldozer Caterpillar or Similar D7T or Similar 38 t 2 2 2 2 2 2 2 2
Bulldozer Caterpillar or Similar D6T or Similar 18 t 3 3 3 3 3 3 3 3
Motor Grader Caterpillar or Similar 140K or Similar 16 t 2 2 2 2 2 2 2 2
Truck Mercedes Benz or Similar Actros 8X4 or Similar 40 t 21 58 71 63 70 70 70 32
Water truck Mercedes Benz or Similar 3340K or Similar 22,000 l 4 4 5 5 5 5 6 4
Operation Support Truck Mercedes Benz or Similar 1726 or Similar 6,000 l 1 2 2 2 2 2 2 2
Crane Truck Mercedes Benz or Similar 2426K or Similar 11 t 1 1 1 1 1 1 1 1
Lightning Tower Light Source NA-T4 - 7 13 14 13 13 13 16 10
Light Vehicle Toyota or Similar Hilux or Similar 5 people 4 5 6 6 6 6 7 5

21501-REP-PM-001
Page | 275

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

16.3.2Operations

 

Mining will commence after the removal and storage of topsoil and waste overburden material. Small excavators will be used initially for drainage work, digging trenches, minor material removal and material disposal. The 70 t and 45 t excavators will be assigned based upon the volume of material for large and medium volume handling. For transport, road trucks (8X4) with a capacity of 40 t are planned.

 

16.3.2.1Loading, Transporting and Unloading of Ore

 

The ore and waste will be blasted, loaded by excavators, transported by trucks with a capacity of 40 t and unloaded on the ROM pad and waste dump respectively. If necessary, a hydraulic rockbreaker will be used to break rock larger than the opening of the crusher’s fixed protection grid.

 

The process plant will be fed at an average rate of 320 t/hr, 24 hours per day, 7 days per week.

 

It is estimated that 100% of the ore, 5% of the soil, 30% of the saprolite and 100% of the fresh rock must be blasted using explosives.

 

As an initial premise, a drilling diameter of 4.0 inches was adopted for ore with 5-metre-high benches and 4.0 inches for waste in 10-metre-high benches.

 

A careful analysis of the characteristics of the Xuxa Mine was performed to determine the most appropriate drilling equipment, as shown in Table 16-11.

 

Table 16-11: Drilling Equipment for Xuxa Pits

 

Size Brand Series Model Hammer Diameter Type
mm inch
23 t Sandvik Pantera DP1500 Top hammer

102 to 140

4.0 to 5.5 Production
16 t Sandvik Ranger DX800 Top hammer

89 to 114

3.5 to 4.5 Pre-split, secondary blasts, small-diameter holes

 

The drilling operation will be supported by a bulldozer and/or hydraulic excavator to carry out cleaning activities in the drilling areas, construction of access points to the drilling area, as well as the use of a hydraulic hammer coupled to the hydraulic excavator for rock handling in the operational area.

 

The rock blasting work comprises primary and secondary blasting and a hydraulic hammer will be used as required.

 

16.3.3Explosives Supply

 

The provision of explosives and the execution of blasting services will be carried out by a subcontractor specializing in blasting, under the guidance of Sigma.

 

For the Xuxa Mine, where appropriate, pumped explosives, stemming and non-electrical accessories will be used.

 

During the mine operation, the daily blasting plans will be prepared by Sigma´s technical team and the results will be evaluated, and any necessary adjustments made to improve blasting effectiveness.

21501-REP-PM-001
Page | 276

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

16.3.4Explosives Magazine and Accessories

 

The explosive magazines will be supplied and built by the company contracted to perform the mining activities. This company will supply and maintain a remote security system, following the guidelines of ORDINANCE No. 147 - COLOG, of November 21, 2019, which provides the administrative procedures for the use and storage of explosives and accessories, as well as ORDINANCE No. 56 - COLOG, of June 5, 2017, which provides the administrative procedures related to registration with the army for the use and storage of army-controlled products (PCE).

 

Area security will be established through compliance with the minimum distances from the storage location to inhabited areas, railways, or highways, according to distances established in the regulation for the Inspection of Controlled Products (R-105). To this end, the plan for transporting, handling and storage of explosives and explosive accessories will be reviewed by Sigma management together with GE21 so that all conditions are fully complied.

 

The security of products controlled by the army (PCE) will be guaranteed through the adoption of measures against deviations, loss, theft, and theft against obtaining knowledge about activities with PCE, in order to avoid their use in the practice of illicit acts. These measures will be included in the Security Plan.

 

Access control will be carried out electronically, 24 hours a day, covering storage and access areas. For this, cameras connected to a remote base will be used and monitored online.

 

The facilities will undergo regular internal inspection to ensure the integrity of the active and passive protection systems. In the case of accidents of any nature, the Security Plan will determine the procedures related to the simultaneous activation of the competent public security bodies, including military and civil police, army and fire department.

 

Contingency measures will be adopted in the event of accidents or detection of illegal practices with explosives, including information to the inspection of army-controlled products (PCE). In these situations, quick and safe activation of the monitoring center and competent authorities listed in the Security Plan will be adopted.

 

For the storage of explosive and blasting accessories, a Rustic Mobile Storage container, installed in accordance with Technical-Administrative Instruction No. 18/99-DFPC, is planned as shown in Figure 16-19. This structure consists of a box truck or adapted container located in a fenced and monitored area, under the same security and monitoring conditions applied to the explosive magazine as shown in, Figure 16-20.

 

 

Figure 16-19: Explosives Magazines in Container

21501-REP-PM-001
Page | 277

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 16-20: Example of Ammonium Nitrate Emulsion Storage Structure

 

16.3.5Fleet Monitoring System

 

The fleet monitoring system (dispatch) to the Xuxa Mine will be carried out through an electronic system that allows the monitoring and management of the mine’s operation in real time. Sigma will work with solutions that allow for the monitoring, management, and optimization of the truck fleet. Using the most advanced hardware, the software monitors and manages each piece of equipment at all stages of the mining production cycle. The software uses algorithms that provide solutions to maximizing productivity and reduce operating costs.

 

A monitoring device is installed in each piece of equipment (excavator and truck) that is responsible for sending various information to control centre, including: location, status of equipment, etc. A communication network will be established between the monitoring equipment, antennas, and the control centre, this enables the monitoring of the entire mine fleet, operations and production with a high level of detail.

 

16.3.6Work Shifts

 

The teams will work in different shifts. The administrative group will work 9 hours a day from Monday to Friday, with 1 hour off for a meal, and 4 hours on Saturday mornings. The operational team will work 7 days a week, 24 hours a day, in a 6x2 shift scheme, where the employees work 6 days consecutively, for 9 hours per shift, and then have 2 days off. This method of shift work provides uninterrupted work and is in accordance with Brazilian labour legislation. The explosives supplier will work 5 days per week, taking Saturdays and Sundays off.

 

16.3.7Labour Mining

 

Sigma is committed to prioritizing the hiring of local labour.

21501-REP-PM-001
Page | 278

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 16 12 lists the expected annual labour requirements for the eight years of mine life; these expectations will be adjusted as required during the mining operation.

 

Table 16-12: Xuxa Staffing Requirement Summary

 

Office Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8
Manager 1 1 1 1 1 1 1 1
Coordinator 1 1 2 2 2 2 1 1
Production Coordinator 6 6 6 6 8 8 8 6
Operational Instructor 2 2 2 2 2 2 2 2
Machine Operators 46 66 73 69 97 92 106 65
Truck Drivers 89 215 261 234 343 343 348 215
Production Assistants 10 11 11 12 14 14 14 11
 Drilling and Rock Blasting Supervisor 7 7 7 7 9 9 9 7
Machine Operator 20 44 52 48 56 60 68 44
Drilling Assistant 23 47 55 51 59 63 71 47
Maintenance Officer 4 4 4 4 5 5 5 4
Mechanic 5 14 17 15 16 16 16 14
Welder 8 10 12 16 20 20 20 10
Tire Fitter/Electrician/Tinsmith 3 3 4 5 5 5 5 3
Greaser 8 8 13 12 15 15 15 8
Maintenance Assistants 8 12 14 14 20 20 20 12
Geologist 1 1 1 1 1 1 1 1
Security Engineer 1 1 1 1 1 1 1 1
Occupational Physician 1 1 1 1 1 1 1 1
Safety Technician 6 6 7 7 9 9 9 6
Surveyor 1 1 1 1 1 1 1 1
Surveying Assistants 2 2 2 2 2 2 2 2
Administrative 3 3 4 4 5 5 5 3
Administrative - Control Room Technician 3 3 4 4 5 5 5 3
Warehouser 3 3 4 4 5 5 5 3
Total 262 472 559 523 702 705 730 471

21501-REP-PM-001
Page | 279

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

16.3.8Labour and Equipment

 

For the mobilization of technical and operational personnel, priority will be given to a local people and those living close to Araçuaí & Itinga Municipalities, using the following schedule:

 

·Recruitment

·Selection

·Conducting admission exams

·Sigma integration

·Introductory equipment/vehicle training

·Initiation into assisted operation

·Final aptitude test

 

16.3.9Site Construction

 

The site construction shall consist of:

 

·Mine Office

·Meeting room

·Control room

·Auditorium

·Cafeteria

·Changing rooms

·First aid post

·Warehouse

·Workshop

·Washing ramp

·Oil and grease storage area

·Fuel storage area

·Recreation area

·Explosive magazine

 

The total area of infrastructure will be approximately 1,390 m², and the total area that the buildings will occupy is approximately 1.5 hectares.

 

All built-up areas will have waterproof flooring, so that there is no risk of soil contamination from the operations, especially in the workshop and washing ramp. The runoff from the roofs will be drained into the gutters to supply the cistern, which will be used at the washing ramp. After using the water in the washing ramp, the water will be sent to the effluent treatment station, which starts in the decanter, followed by the oil and grease separator box with capacity of 20m³/day.

 

The water and oil separator system must operate at a flow rate of 20m³/day, which complies with the ABNT NBR 14605 standard and the ASTM D 6104/03 international standard. The analysis standards to verify the efficiency and quality of the water must follow the CONAMA Resolution No. 357/2005 for the parameters of oils and greases. After treatment the water will be pumped back to the process water tank.

 

16.3.10Wastewater Treatment

 

Step 1: The effluent from the drains (channels) from the workshop, washing ramp and oil deposit, oil and grease separator stage, will be drained to the decanter where it will undergo the first sedimentation process. The process consists of separating solid particles from water by the action of gravity. The flow velocity of the liquid is reduced, favoring the sedimentation of these particles. The water enters the next step, which further separates the suspended solids. The solids from the first process are deposited at the bottom of the decanter, where they will be periodically removed.

21501-REP-PM-001
Page | 280

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Step 2: In the module for separation of solids (MSS) the solids coming from the water used to wash the equipment are separated by the process of gravity and sedimentation of the particles. This process removes the remaining particulate matter suspended in the fluid, allowing oil and water to flow to the next stage, avoiding the silting of the remaining procedure. Solids will be removed and stored in an appropriate place.

 

Step 3: The water and oil separator box (WOSB) receive all the effluent from the MSS process. This system has, among others, two basic constituents: water and oil. The process of separating water and oil occurs by density difference. The clean water will be released into the rainwater drainage network. Periodically (biannually) samples will be collected at the final outlet, the third box of the water and oil separation system, so that the efficiency of the system and the quality of the effluent is known.

 

Step 4: The supernatant oil goes to the oil collection reservoir (OCR) to be removed and sent for recycling. Used oils will be sent to a certified and approved company, with the relevant documentation and authorization, in accordance with the applicable legal requirements. Likewise, tailings will be monitored, in relation to quantity and classification, and recorded in the waste inventory worksheet of the Sigma integrated management system.

 

Step 5: Contaminated oil and grease residues (Class I) must be packed in properly identified drums and sent to an appropriate collection company. This waste output will be registered by Sigma by filling out the waste transport manifest (MTR), according to the waste management procedure.

 

Figure 16-21 shows a schematic of the model to be built for the water treatment of effluent from the washing ramp and the modules of the water and oil separator box.

 

 

Figure 16-21: Schematic of Wash Ramp Oil-Water Separator

 

16.3.11Solid Waste Management

 

To meet the demand for internal solid waste generation, Sigma will have a waste deposit located next to the oil storage structure, physically separated in accordance with safety standards, such as physical divisions, roof, waterproofed floor, channels, and drains. Next to this will be located waste disposal bays for items such as plastic, paper/cardboard, metals, glass, and contaminated waste (towels, filters, PPE, etc.). Tires must be stored inside the warehouse until they are sent to their final destination off site. Organic waste must be delivered to locations properly prepared to receive this type of material. Figure 16-22 shows the solid waste temporary storage layout.

21501-REP-PM-001
Page | 281

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

According to ABNT NBR 10.004 - Waste Classification, waste must be collected, segregated/packaged, and sent to the final destination, to companies licensed by the appropriate environmental agency. Periodically, Sigma will be monitoring their waste generation, and checking the internal waste inventory worksheet, a tool that it uses within the integrated management system.

 

 

Figure 16-22: Schematic of Solid Waste Temporary Storage Facility

 

16.3.12Site Access

 

The construction of site access necessary to start ore mining operations, waste removal, access to the waste dump and marginal ore, auxiliary accesses and others that may be required will be carried out according to the specific project’s requirements.

 

If necessary, land clearing, including the removal of trees, undergrowth and debris will be performed using a D6T crawler tractor with ripper. The material removed will be loaded with a 35t excavator and transported with trucks with a capacity of 20m³.

 

The leveling of accesses, considering slope and slope for land drainage will be carried out through cutting and filling using a D6T crawler tractor, 35 t and 55 t excavator, 20m³ trucks, grader and water trucks. Low strength soils will be replaced. Surface drainage and construction of berms will be carried out with a 20 t excavator.

 

16.3.13Road Construction and Maintenance

 

The construction and maintenance of site roads will require the following:

 

·Initial construction of the roads

·Water and storm drainage

21501-REP-PM-001
Page | 282

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

·Construction of safety berms

·Reflective signage

·Dust suppression.

 

16.3.14Excavation, Loading, Transport and Soil Treatment

 

The excavation stage will start after the removal and storage of the topsoil.

 

As the excavation progresses, drainage systems will be installed to avoid the accumulation of rainfall.

 

It is planned to mobilize a 20 t excavator for drainage services, trench excavation, material disposal and small handling. 70 t and 45 t excavators will be used according to the volume requirements for large and medium volumes. For transport, 8x4 trucks, with a capacity of 40 t, will be used, allowing for productivity and safety.

 

16.3.15Drilling and Blasting

 

The geology and rock types at the Xuxa Mine are crucial for defining drilling and blasting parameters, which relates to mining recovery. The mineralized bodies are made up of tabular dykes with sub-horizontal foliation and shallow dip (40° to 45°), which can range in thickness from a few metres to more than 40 metres, averaging 12 to 13 metres.

 

It is important to know the limits of the ore body to minimize dilution and losses. Sigma will have a geologist as part of its technical staff who will work directly with the drilling, blasting and loading teams. Employees who are directly involved in activities related to optimizing the mining recovery, such as drill operators, drilling assistants, rock blasting team, and excavator operators, will be trained to recognize minerals to avoid deviation from planned mineral boundaries.

 

As this is a greenfield project, it is foreseeable that Sigma’s technical teams will go through a learning period based on the empirical results acquired with operation commencement. Naturally, changes to rock blast parameters and operating methods will be required. Consideration should be given not only to the complexity of the geological formation and the operational challenges resulting from this condition, but also to the context of the environment in which the mine will be located.

 

Previous studies (pre-blast survey) before the first blasting should be developed to establish the minimum distances between pre-existing structures that will be kept and the blasted benches. As a result, restrictions or opportunities relating to the maximum load per drill hole may be revealed, which may indicate the maximum blasthole diameter, as well as the type of accessories used. These factors, among others, may imply technical and commercial adjustments throughout the life of the mine operation, Table 16-13, Table 16-14 and Table 16-15 detail the drilling and blasting for ore, weathered waste and fresh waste respectively.

21501-REP-PM-001
Page | 283

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 16-13: Xuxa Preliminary Drill and Blast Plan - Ore

 

Drilling and Blasting Rock Parameters Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8
Ore m³ in situ 555,937 558,264 542,727 550,683 558,414 538,599 548,657 519,535
Ore t 1,578,861 1,585,469 1,541,345 1,563,940 1,585,895 1,529,621 1,558,185 1,475,480
Average Density t/m³ 2.84 2.84 2.84 2.84 2.84 2.84 2.84 2.84
Hole Diameter inch 4 4 4 4 4 4 4 4
Burden m 2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3
Spacing m 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8
Blast Pattern 6.44 6.44 6.44 6.44 6.44 6.44 6.44 6.44
Spacing/Burden - 1.22 1.22 1.22 1.22 1.22 1.22 1.22 1.22
Subdrilling m 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7
Bench height m 5 5 5 5 5 5 5 5
Stiffness Ratio (Height/Burden) - 2.17 2.17 2.17 2.17 2.17 2.17 2.17 2.17
Drill Angle degrees ° 8 8 8 8 8 8 8 8
Hole Length m 5.76 5.76 5.76 5.76 5.76 5.76 5.76 5.76
Volume per Hole 32.2 32.2 32.2 32.2 32.2 32.2 32.2 32.2
Mass per Hole t 91.45 91.45 91.45 91.45 91.45 91.45 91.45 91.45
m³ Blasted/m Drilled m³/m 5.59 5.59 5.59 5.59 5.59 5.59 5.59 5.59
Specific Drilling m/m³ 0.179 0.179 0.179 0.179 0.179 0.179 0.179 0.179
Specific Drilling m/t 0.063 0.063 0.063 0.063 0.063 0.063 0.063 0.063
Drilled Metres m 99,378 99,794 97,017 98,439 99,821 96,279 98,077 92,871
Necessary Holes hole 17,265 17,337 16,855 17,102 17,342 16,727 17,039 16,135
Explosive Density g/cm³ 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15
Linear Load Ratio kg/m 9.32 9.32 9.32 9.32 9.32 9.32 9.32 9.32
Top Stemming m 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8
Explosive Column m 3.96 3.96 3.96 3.96 3.96 3.96 3.96 3.96
Load per Hole kg 36.87 36.87 36.87 36.87 36.87 36.87 36.87 36.87
Load Ratio g/m³ 1,145 1,145 1,145 1,145 1,145 1,145 1,145 1,145
Load Ratio g/t 403 403 403 403 403 403 403 403

21501-REP-PM-001
Page | 284

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 16-14: Xuxa Preliminary Drill and Blast Plan – Waste, Soil and Saprolite - Weathered

 

Drilling and Blasting Rock Parameters Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7
Waste Soil and Weathered m³ in situ 144,470 430,446 234,875 170,535 147,165 200,151 205,179
Waste Soil and Weathered t 390,315 1,149,734 626,176 444,244 397,295 536,241 553,914
Weighted Average Density t/m³ 2.7 2.67 2.67 2.61 2.7 2.68 2.7
Hole Diameter inch 4 4 4 4 4 4 4
Burden m 2.6 2.6 2.6 2.6 2.6 2.6 2.6
Spacing m 3.4 3.4 3.4 3.4 3.4 3.4 3.4
Blast Pattern 8.84 8.84 8.84 8.84 8.84 8.84 8.84
Spacing/Burden - 1.31 1.31 1.31 1.31 1.31 1.31 1.31
Subdrilling m 0.7 0.7 0.7 0.7 0.7 0.7 0.7
Bench height m 10 10 10 10 10 10 10
Stiffness Ratio (Height/Burden) - 3.85 3.85 3.85 3.85 3.85 3.85 3.85
Drill Angle degrees ° 8 8 8 8 8 8 8
Hole Length m 10.81 10.81 10.81 10.81 10.81 10.81 10.81
Volume per Hole 88.4 88.4 88.4 88.4 88.4 88.4 88.4
Mass per Hole t 238.83 236.12 235.67 230.28 238.65 236.84 238.65
m³ Blasted/m Drilled m³/m 8.18 8.18 8.18 8.18 8.18 8.18 8.18
Specific Drilling m/m³ 0.122 0.122 0.122 0.122 0.122 0.122 0.122
Specific Drilling m/t 0.045 0.046 0.046 0.047 0.045 0.046 0.045
Drilled Metres m 17,659 52,613 28,709 20,845 17,988 24,464 25,079
Necessary Holes holes 1,634 4,869 2,657 1,929 1,665 2,264 2,321
Explosive Density g/cm³ 1.15 1.15 1.15 1.15 1.15 1.15 1.15
Linear Load Ratio kg/m 9.32 9.32 9.32 9.32 9.32 9.32 9.32
Top Stemming m 2.2 2.2 2.2 2.2 2.2 2.2 2.2
Explosive Column m 8.61 8.61 8.61 8.61 8.61 8.61 8.61
Load per Hole kg 80.2 80.2 80.2 80.2 80.2 80.2 80.2
Load Ratio g/m³ 907 907 907 907 907 907 907
Load Ratio g/t 336 340 340 348 336 339 336

21501-REP-PM-001
Page | 285

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 16-15: Xuxa Preliminary Drill and Blast Plan – Waste - Fresh

 

Drilling and Blasting Rock Parameters Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8
Waste Fresh Rock m³ in situ 1,456,444 6,035,115 8,873,041 7,247,742 9,235,880 9,520,679 12,876,779 5,261,939
Waste Fresh Rock t 4,238,252 17,562,184 25,820,548 21,090,928 26,876,412 27,705,175 37,471,428 15,312,243
Weighted Average Density t/m³ 2.91 2.91 2.91 2.91 2.91 2.91 2.91 2.91
Hole Diameter inch 4 4 4 4 4 4 4 4
Burden m 2.6 2.6 2.6 2.6 2.6 2.6 2.6 2.6
Spacing m 3.15 3.15 3.15 3.15 3.15 3.15 3.15 3.15
Blast Pattern 8.19 8.19 8.19 8.19 8.19 8.19 8.19 8.19
Spacing/Burden - 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21
Subdrilling m 0.7 0.7 0.7 0.7 0.7 0.7 0.7 0.7
Bench height m 10 10 10 10 10 10 10 10
Stiffness Ratio (Height/Burden) - 3.85 3.85 3.85 3.85 3.85 3.85 3.85 3.85
Drill Angle degrees ° 8 8 8 8 8 8 8 8
Hole Length m 10.81 10.81 10.81 10.81 10.81 10.81 10.81 10.81
Volume per Hole 81.9 81.9 81.9 81.9 81.9 81.9 81.9 81.9
Mass per Hole t 238.33 238.33 238.33 238.33 238.33 238.33 238.33 238.33
m³ Blasted/m Drilled m³/m 7.58 7.58 7.58 7.58 7.58 7.58 7.58 7.58
Specific Drilling m/m³ 0.132 0.132 0.132 0.132 0.132 0.132 0.132 0.132
Specific Drilling m/t 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045
Drilled Metres m 192,150 796,219 1,170,630 956,202 1,218,500 1,256,073 1,698,847 694,213
Necessary Holes holes 17,783 73,689 108,340 88,495 112,770 116,248 157,226 64,248
Explosive Density g/cm³ 1.15 1.15 1.15 1.15 1.15 1.15 1.15 1.15
Linear Load Ratio kg/m 9.32 9.32 9.32 9.32 9.32 9.32 9.32 9.32
Top Stemming m 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2
Explosive Column m 8.61 8.61 8.61 8.61 8.61 8.61 8.61 8.61
Load per Hole kg 80.2 80.2 80.2 80.2 80.2 80.2 80.2 80.2
Load Ratio g/m³ 979 979 979 979 979 979 979 979
Load Ratio g/t 337 337 337 337 337 337 337 337

21501-REP-PM-001
Page | 286

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Based upon the rock characteristics and operating parameters, the top hammer drilling method has been chosen as the optimal method. Due to experience with and availability of the equipment, tools, original replacement parts, and technical services, the authors recommend the Sandvik equipment listed in Table 16-16.

 

Table 16-16: Xuxa Recommended Drill and Blast Rigs

 

Size Brand Series Model Hammer Diameter Type
mm inch
23 t Sandvik Pantera DP1500 Top 102 to 140 4.0“ a 5.5” Production, pre-split, occasional services
16 t Sandvik Ranger DX800 Top 76 to 114 3.0“ a 4.5” Production, pre-split, secondary blasts

 

Using the parameters established for blasting, it was possible to calculate the drill requirements needed to meet the planned production schedule for the Xuxa Mine as shown in Table 16-17.

 

A drop in physical availability over time due to the natural wear and tear and increased use of the equipment once the mine is operational is expected. An efficiency factor was also included for the learning period needed by the operational team and for optimization of operations over time.

 

If the fleet has operational variations throughout the mine life, it is understood that operations planning will be adjusted, making it possible to optimize the available resources.

 

If it is necessary to implement different grids than was originally planned or to add slope preservation methods, such as damping lines, pre-cut or post-cut, the amount of drilling will tend to increase. Should an increase in the amount of drilling be required, the fleet and staff will be adequate to meet this demand.

 

The proposed top hammer drills have an operating cabin with ROPS/FOPS certification, air conditioning, acoustic insulation system, dust collector, hole cleaning air monitoring system, rod greasing system, angle and depth gauge, and water injection for dust control.

 

The drilling operation will be supported by a bulldozer and/or hydraulic excavator to carry out the cleaning and preparation of the drilling benches, access construction to the drilling benches, as well as a hydraulic rock breaker coupled to the hydraulic excavator to remove blocks in the operational area.

21501-REP-PM-001
Page | 287

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 16-17: Xuxa Preliminary Calculations for Drilling Requirements

 

Drilling Sizing Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8
Drilled Metres quantity 309,187 948 627 1 296 356 1 075 486 1 336 309 1 376 817 1 822 003 787 085
Days / Year quantity 365 365 366 365 365 365 365 365
Shifts / Day quantity 3 3 3 3 3 3 3 3
Hours / Shift quantity 8 8 8 8 8 8 8 8
Calendar Hours hours 8.76 8.76 8.784 8.76 8.76 8.76 8.76 8.76
FA - Physical Availability % 85% 84% 82% 80.50% 80% 80% 80% 80%
Hours Available hours 7 446 7 315 7 203 7 052 7 008 7 008 7 008 7 008
Unproductive Hours hours 2 949 2 402 2 408 2 402 2 402 2 219 2 219 2402
GU - Global Usage % 55% 59% 62% 62% 62% 62% 62% 62%
OI Operating Income % 47% 49% 51% 50% 50% 50% 50% 50%
Efficiency Factor % 90% 92% 94% 96% 98% 100% 100% 100%
Productivity Ore m/h 22 22 22 22 22 22 22 22
Soil And Saprolite Productivity m/h 35 35 35 35 35 35 35 35
Waste Productivity m/h 30 30 30 30 30 30 30 30
Weighted Average Productivity m/h 27.7 29.4 29.5 29.4 29.5 29.5 29.6 29.1
Global Specific Drilling m/m³ 0.14 0.14 0.13 0.13 0.13 0.13 0.13 0.14
Drilling Productivity m³/h 193.3 217.9 219.7 217.6 219.2 220 221.7 213.4
Effective Hours Worked hours 3 686 3 970 4 198 4 197 4 258 4 345 4 345 4 345
Metres Per Drill m/year 102 148 116 871 123 887 123 250 125 484 128 304 128 777 126 247
Metres Per Drill m/month 8 512 9 739 10 324 10 271 10 457 10 692 10 731 10 521
Equipment Numbers Required quantity 4 9 11 9 11 11 15 7

21501-REP-PM-001
Page | 288

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

16.3.16Explosives Consumption

 

The consumption of explosives and accessories was calculated based on the parameters of the blasting plans presented above in Table 16-13 to Table 16-15. The tables below, Table 16-18 to Table 16-20 show the estimated annual consumption of pumped explosives, non-electrical accessories, and remote activation through electronic fuse for ore, waste and the combined totals respectively. In addition, small allowances for explosives and accessories were included, for secondary blasting of oversize rock.

21501-REP-PM-001
Page | 289

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 16-18: Xuxa Estimated Annual Consumption of Explosives - Ore

 

Rock Blasting / Pumped Emulsion Blaster + Non-Electric / Bulk Emulsion + Non-Electric
Ore
Item / Quantities Unit Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Total
Bulk Emulsion kg 636,566 639,231 621,441 630,551 639,402 616,714 628,230 594,885 5,007,02
Ammonium Nitrate kg                  
Packaged Explosive kg 9,548 9,588 9,322 9,458 9,591 9,251 9,423 8,923 75,105
250 g Booster unit 17,610 17,684 17,192 17,444 17,689 17,061 17,380 16,457 138,518
450 g Booster unit                  
NP05 Detonating cord unit                  
NP10 Detonating cord unit                  
6 m NW in hole delay unit 17,610 17,684 17,192 17,444 17,689 17,061 17,380 16,457 138,518
12 m NW in hole delay unit 3,453 3,467 3,371 3,420 3,468 3,345 3,408 3,227 27,160
15 m NW in hole delay unit                  
18 m NW in hole delay unit                  
4.8 m NW Surface delay unit                  
6 m NW Surface delay unit 1,151 1,156 1,124 1,140 1,156 1,115 1,136 1,076 9.053
300 m NW Initiator unit                  
500 m NW Initiator unit                  
Electronic unit 115 116 112 114 116 112 114 108 905
Blasting fuse unit                  
Eletronic cable m 2,302 2,312 2,247 2,280 2,312 2,230 2,272 2,151 18,107

21501-REP-PM-001
Page | 290

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 16-19: Xuxa Estimated Annual Consumption of Explosives - Waste

 

Rock Blasting / Pumped Emulsion Blaster + Non-Electric / Bulk Emulsion + Non-Electric
Waste
Item / Quantities Unit Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Total
Bulk Emulsion kg 1,557,282 6,300,365 8,901,955 7,252,020 9,177,690 9,504,648 12,795,650 5,152,720 60,642,330
Ammonium Nitrate kg                  
Packaged Explosive kg 23,359 94,505 133,529 108,780 137,665 142,570 191,935 77,291 909,635
250 g Booster unit 19,806 80,129 113,217 92,233 116,724 120,882 162,738 65,533 771,261
450 g Booster unit                  
NP05 Detonating cord unit                  
NP10 Detonating cord unit                  
6 m NW in hole delay unit 19,417 78,558 110,997 90,424 114,435 118,512 159,547 64,248 756,138
12 m NW in hole delay unit 23,689 95,841 135,416 110,317 139,611 144,584 194,647 78,383 922,489
15 m NW in hole delay unit                  
18 m NW in hole delay unit                  
4.8 m NW Surface delay unit                  
6 m NW Surface delay unit 19,806 112,076 158,356 129,005 163,261 169,077 227,620 91,661 1,070,861
300 m NW Initiator unit                  
500 m NW Initiator unit                  
Electronic unit 129 524 740 603 763 790 1.064 428 5.041
Blasting fuse unit                  
Eletronic cable m 2,589 10,474 14,800 12,057 15,258 15,802 21,273 8,566 100,818

21501-REP-PM-001
Page | 291

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 16-20: Xuxa Estimated Annual Consumption of Explosives – Combined Ore and Waste

 

Rock Blasting / Pumped Emulsion Blaster + Non-Electric / Bulk Emulsion + Non-Electric
Total Production
Item / Quantities Unit Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Total
Bulk Emulsion kg 2,193,849 6,939,595 9,523,496 7,882,571 9,817,093 10,121,362 13,423,880 5,747,605 65,649,351
Ammonium Nitrate kg                  
Packaged Explosive kg 32,908 104,094 142,851 118,239 147,256 151,820 201,358 86,214 984,740
250 g Booster unit 37,416 97,813 130,409 109,677 134,413 137,943 180,117 81,991 909,779
450 g Booster unit                  
NP05 Detonating cord unit                  
NP10 Detonating cord unit                  
6 m NW in hole delay unit 37,028 96,242 128,189 107,868 132,124 135,573 176,926 80,706 894,656
12 m NW in hole delay unit 27,142 99,308 138,787 113,738 143,079 147,930 198,055 81,610 949,649
15 m NW in hole delay unit                  
18 m NW in hole delay unit                  
4.8 m NW Surface delay unit                  
6 m NW Surface delay unit 20,957 113,232 159,479 130,145 164,417 170,192 228,756 92,737 1,079,914
300 m NW Initiator unit                  
500 m NW Initiator unit                  
Electronic unit 245 639 852 717 879 902 1,177 536 5,946
Blasting fuse unit                  
Eletronic cable m 4,891 12,786 17,047 14,337 17,570 18,032 23,545 10,718 118,925

21501-REP-PM-001
Page | 292

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

16.3.17Blasting Plan

 

During the operation, the daily blast plans will be prepared by the explosive supplier’s technical staff. These plans will be analysed and validated by the Sigma rock blasting team.

 

After each blast, the blast plan will be updated according with the equipment quantities actually used. Physical and digital copies of all generated documentation will be kept, which will be available for audits or inspection by regulatory bodies.

 

16.3.18Execution of Blasting

 

Rock blasts will be carried out on scheduled dates, the frequency of which will meet the demand for blasted ore and waste.

 

For all rock blasting, the authorities will also be previously communicated through the Rock Blasting Notice, as per Annex of ORDINANCE No. 147 - COLOG, of November 21, 2019.

 

16.3.19Fragmentation Control

 

The fragmentation control will be carried out through specialized software, generating granulometric distribution curves from photographic records. This monitoring allows for blast pattern adjustments, sequencing and other parameters according to the results history. Monitoring will be carried out on a monthly basis for rock blasting and/or whenever the contractor’s technical team deems is necessary to optimize the operation.

 

Figure 16-23 shows an example of image analysis and particle size distribution calculation using granulometric distribution curves.

 

The blasts will be filmed with high-definition cameras that allow a detailed visual assessment of factors such as detonation sequencing, mass displacement, top stemming efficiency and ultra-launch.

 

 

Figure 16-23: Image Analysis and Calculation of Granulometric Distribution

 

16.4Barreiro Open Pit Mining

 

The Barreiro Deposit will be mined by open pit mining methods, using a contracted mining fleet consisting of hydraulic excavators, front-end loaders, and 40t trucks for both waste and ore, coupled with appropriate auxiliary support equipment.

21501-REP-PM-001
Page | 293

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

  

16.4.1Risk Evaluation

 

GE21 evaluated the potential risks of mining and geotechnical activities for the Barreiro Project. Six risks were identified and considered as follows:

 

1.Mineral Resources block model, backing the LOM, may not be robust.

 

2.Deficient geological information (deeper horizons) may compromise the LOM model precision.

 

3.The Mineral Resource block model is deficient (lacking diverse parameters such as recovery, work index (WI), contaminants, or mineralogy for example), compromising the preparation of a proper plant feed blending plan.

 

4.Atmospheric contamination caused by mine dust.

 

5.Production problems and interruption, due to environmental licensing delays.

 

6.Model cannot predict dilution with proper precision due to deficiencies in the mine geological mapping and blasting mixing.

 

GE21 recommend a continuous monitoring of the identified risks, with regular reports submitted to Sigma management for consideration.

 

16.4.2Geotechnical and Hydrogeological Analysis

 

16.4.2.1Geotechnical

 

A geotechnical field study, analysis and design was performed to provide key design parameters for the Barreiro pit.

 

Data analysis is supported by a comprehensive investigation and geotechnical assessment of the drill hole samples, and laboratory tests consisting of uniaxial compressive testing (UCS), triaxial testing, indirect tensile strength testing (Brazilian test), and direct shear strength testing. The stability analyses led to the recommendation of inclination angles for the pit walls which are considered to be prudent and within appropriate safety factors expected of a PFS. The stability analyses considered information on the strength parameters of various rock and soil materials, in association with the understanding of the expected rupture mechanisms that could occur on the pit slopes.

 

The walls of the Barreiro pit will be entirely within a biotite schist unit, consisting of a low to medium intensity of schistosity. Figure 16-24 is a stereogram of two joint main structures identified at Barreiro using optical televiewing (OPTV).

 

The soil and overburden are up to 5 m deep, with a transition zone of saprolite with moderately altered rock up to 30 m in depth. The basement (fresh rock) is a compact biotite schist, showing little to no change in the original colour of the minerals and moderate to high mechanical strength (weathering zone ranging from W2 on the top to W1).

 

The rock mass has good to excellent RQD (75 – 100%), low fracturing degree (F2), and RMR class II/I, corresponding from good to very good rock mass strength.

21501-REP-PM-001
Page | 294

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

  

 

Figure 16-24: OPTV-derived stereogram showing two main joint structures at Barreiro

 

16.4.2.2Geomechanical Characterization

 

Three oriented geotechnical holes were drilled to help determine the geomechanical characteristics of the biotite schist in the Barreiro pit walls. The holes were logged, and images and geological structures were obtained by OPTV. Uniaxial compression tests (UCS) and direct shear tests were completed on the core and the results are presented in Table 16-21 and 16-22 respectively.

 

Half of the mean values for the friction angle and cohesion were adopted in the stability analyses, based on a conservative approach.

 

Table 16-21: Uniaxial Compression Test (UCS) Results Barreiro Pit

 

Lithology Code Height
(mm)
Diameter
(mm)
UCS
(MPa)
Young
Modulus
(Gpa)
Poisson’s
Ratio
Biotite schist GT-0077_CP_01 170.83 62.98 52.30 38.48 0.305
GT-0082_CP_02 170.26 61.48 45.13 29.84 0.281
GT-0083_CP_03 165.56 62.73 55.02 24.89 0.263
GT-0084_CP_04 162.10 62.71 66.42 23.34 0.221
GT-0085_CP_05 169.53 62.93 54.20 21.68 0.288
             
      S.Dev. 6.86 6.06 0.03
      Mean 54.61 27.65 0.27
      C.V. 0.13 0.22 0.11

21501-REP-PM-001
Page | 295

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 16-22: Direct Shear Test Results Barreiro Pit

 

RESIDUAL RESISTANCE
Lithological Code Friction Angle (°) Cohesion (MPa)
SCHMI 67 1.7
66 1.2
60 1.1
     
S.Dev. 3.0 0.32
Mean 64 1.33
C.V. 5% 24%

 

16.4.2.3Pit Sectorization

 

The pit was divided into 5 sectors according to the orientation of the pit wall slopes and geological structures, as shown in Figure 16-25.

 

 

Figure 16-25: Barreiro Pit Sectorization

21501-REP-PM-001
Page | 296

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

  

16.4.2.4Kinematic Analyses

 

Kinematic analyses were performed for the different sectors to assess planar and toppling ruptures.

 

The friction angle adopted was obtained from the direct shear tests result values and was calculated using the mean minus two standard deviations.

 

Figure 16-26 to Figure 16-31 show the analyses for the sectors and the respective percentages of occurrences.

 

Based on the analysis results, the greatest risk is within sector 5, with the possibility of 30% failure due to wall collapse. However, this risk is within the acceptable limits set out under international best practices for pit projects. This risk can be mitigated and controlled by screening the pit walls in this area.

 

 

Figure 16-26: Barreiro kinematic analysis for sector 1 with 5% planar rupture occurring

21501-REP-PM-001
Page | 297

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

  

 

Figure 16-27: Barreiro kinematic analysis for sector 1 with 4% planar rupture occurring

 

 

Figure 16-28: Barreiro kinematic analysis for sector 3 with 4% planar rupture occurring

21501-REP-PM-001
Page | 298

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

  

 

Figure 16-29: Barreiro kinematic analysis for sector 4 with 4% planar rupture occurring

 

 

 

Figure 16-30: Barreiro kinematic analysis for sector 5 with 5% planar rupture occurring

21501-REP-PM-001
Page | 299

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

 

Figure 16-31: Barreiro Kinematic analysis for sector 5 with 30% planar rupture occurring

 

16.4.2.5Limit Equilibrium Slope Stability Analysis

 

The following conditions were assumed for the stability analysis:

 

·The rock mass was considered an anisotropic material

 

·For the condition perpendicular to foliation, the residual strength of direct shear tests was considered

 

·Foliation was considered half the mean of the friction angle and cohesion for the parallel condition

 

·Slope partially saturated

 

The results of the analyzes are shown in Table 16-23 and in Figure 16-32 to Figure 16-36.

 

Table 16-23: Barreiro Slope Stability Analysis

 

Section Sector Minimum
SF
SEC 01 01 1.92
SEC 02 02 1.43
SEC 03 03 1.80
SEC 04 03 1.99
SEC 05 04 2.18

21501-REP-PM-001
Page | 300

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

  

 

Figure 16-32: Analysis of section 01 with FS = 1.92

 

 

Figure 16-33: Analysis of section 02 with FS = 1.43

21501-REP-PM-001
Page | 301

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

  

 

Figure 16-34: Analysis of section 03 with FS = 1.80

 

 

Figure 16-35: Analysis of section 04 with FS = 1.99

21501-REP-PM-001
Page | 302

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

  

 

Figure 16-36: Analysis of section 05 with FS = 2.18

 

16.4.2.6Recommended Geometry for Pit Slopes

 

Based on the results of the kinematic analyses and the limit equilibrium analyses, adjustments must be made to the pit wall slopes projected in the upper pit portions, from surface to a depth of 35m.

21501-REP-PM-001
Page | 303

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

In the current phase of the studies, the following geometry, shown in Table 16-24, is recommended.

 

Table 16-24: Barreiro Recommended Pit Slope Geometry

 

Sectors Face Angle
(º)
Berm Width (m) Bench Height (m) Inter-ramps
Slopes Angle (º)
01 - Overburden 55 6 10 37.6
01 - Fresh Rock 84 6 10 55
02 - Overburden 55 6 10 37.6
02 - Fresh Rock 84 6 10 55
03 - Overburden 47 6 10 33,7
03 - Fresh Rock 75 5 10 52
04 - Overburden 55 6 10 37,6
04 - Fresh Rock 84 6 10 55
05 - Overburden 55 6 10 37,6
05 - Fresh Rock 84 6 10 55

 

16.4.2.7Hydrogeology

 

Sigma’s Grota do Cirilo Project is situated within the Jequitinhonha River Hydrographic Basin (Figure 16-37) which is located in the mesoregions of the Jequitinhonha Valley and Northern Minas Gerais, with a drainage area of 19,803 km². The climate in the basin is considered semi-arid, with a dry period varying from four to five months per year, and hydraulic availability between 2 and 10 litres per second per square kilometre.

 

The Barreiro deposit is situated immediately east of the Piauí River, a shallow, intermittent river that is a tributary of the Jequitinhonha River (Figure 16-38). GE21 conducted a field inspection of the site on the 5th and 6th April 2021. All the secondary drainage channels from the Barreiro site to the Piauí River were inspected. All the drainage channels were dry, and it was concluded that the secondary drainage channels only flow after a rainfall event. Figure 16-38 shows the area of the field trip and the drainage points inspected.

21501-REP-PM-001
Page | 304

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

  

 

Figure 16-37: Jequitinhonha River Basin in Minas Gerais state, Brazil

21501-REP-PM-001
Page | 305

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

  

 

Figure 16-38: Route map and drainage points inspected in the Barreiro area

 

Water samples to determine the physical and chemical parameters of the water (pH, EH, conductivity and temperature) were collected at 2 points in the Piaui River. The average measurement shows a 7.8 pH in the Piaui River within the project area, an important parameter that clearly indicates rainwater without any acidic water characteristics. The average electrical conductivity measured at Piaui River is 54.3 µS. This extremely low value demonstrates that the water, although muddy in appearance, has very little suspended solids. The water grade of dissolved solids is extremely low, with an average of 27.4 ppm, which gives the water a low electrical conductivity, an important parameter to analyze the origin of water when related to pH. The average obtained from the measurements was 217.9 mv, and this positive value indicates fast circulating water and an oxidizing environment typical of rainwater. The average water temperature of the Piaui River in the project area was 28.9 °C.

 

16.4.2.7.1Hydrogeological Characterization

 

Regarding the hydrogeological characterization of the Barreiro pit area, the following considerations can be stated:

 

·In general terms, the Piaui River has characteristics of both an influent and an effluent river, with the influent component being more prominent

·Effluent rivers receive water from the ground through their streambeds, while influent rivers lose water through evaporation and seepage into the ground

·The main groundwater flow occurs in the contact region between the altered saprolite/fresh rock, as observed in the drill cores of geotechnical drillholes campaign

21501-REP-PM-001
Page | 306

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

  

Nine drill holes from the Barreiro drilling campaigns were assessed for groundwater levels. Table 16-25 shows the results of that assessment and Figure 16-39 shows the location of the drill holes and the estimated potentiometric map of the Barreiro area.

 

Table 16-25: Survey results of groundwater levels in Barreiro exploration drillholes

 

Hole Id Coordinates (UTM - SIRGAS 2000) Hole Depth (m) Water Level (m)
X Y
DH-BAR-15 190687 8140463 291.79 279.76
DH-BAR-40 191010 8140521 305.77 289.13
DH-BAR-60 190780 8140711 320.04 279.42
DH-BAR-62 190882 8140763 331.25 317.94
DH-BAR-81 191075 8140675 322.24 288.14
DH-BAR-86 191145 8140616 313.36 289.46
DH-BAR-93 191102 8140711 326.85 287.53
DH-BAR-96 190545 8140524 293.79 278.46
DH-BAR-98 191135 8140440 313.93 287.04

 

 

Figure 16-39: Drill hole locations and potentiometric map of the Barreiro area

21501-REP-PM-001
Page | 307

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

The interpretation of the water level survey data in the drillholes is preliminary and shows an underground watershed divided in the central area of the rock massif, with SW flows to the Piaui River basin and NE flow to the opposite side.

 

16.4.2.7.2Water Circulation Potential

 

Three geotechnical drill holes were drilled into the proposed Barreiro pit area (Figure 16-40). The data from these holes, together with geotechnical data logged in other exploration holes were assessed to determine the water circulation potential for the Barreiro pit.

 

The holes were assessed on two criteria:

 

·Zones with RQD below 70 and below the contact zone between the saprolite and fresh rock were selected

·Areas with RQD below 70 and above the depth of 180 metres (bottom of the pit) were selected

 

The contact between the saprolite and fresh rock was selected as the area with highest potential for water circulation. Table 16-26 shows the drill holes assessed with the contact depths.

 

Table 16-26: Depth values of saprolite-fresh rock boundary Barreiro drill holes

 

Hole Id Contact
Depth (m)
Litho-Code
GTB-DH-001 10.00 SAP
GTB-DH-002 20.95 SAP
GTB-DH-003 22.50 SAP
DH-BAR-09 7.15 SAP
DH-BAR-13 21.06 SAP
DH-BAR-18 5.75 SAP
DH-BAR-26 21.05 SAP
DH-BAR-30 9.75 SAP
DH-BAR-31 16.27 SAP
DH-BAR-33 7.91 SAP
DH-BAR-37 5.36 SAP
DH-BAR-40 1.98 SUN
DH-BAR-41 21.24 SAP
DH-BAR-43 16.41 SAP
DH-BAR-45 11.78 SAP
DH-BAR-47 8.07 SAP
DH-BAR-50 5.69 SAP
DH-BAR-52 21.45 SAP
DH-BAR-54 27.66 SAP
DH-BAR-75 14.92 SAP
DH-BAR-76 5.85 SAP
DH-BAR-84 7.95 SAP
DH-BAR-99 15.20 SAP

21501-REP-PM-001
Page | 308

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

  

 

Figure 16-40: Barreiro geotechnical drill hole locations

 

16.4.2.7.3Climatological and Hydrological Assessment

 

Broadly speaking, the area of Brazil where the Grota do Cirilo project is located is within the tropical savannah climate (Aw – drier winter) under the Köppen Climatic Classification system. Locally, however, the climate in Intinga and Aracuai is characterized as hot semi-arid (BSh) under the same classification system.

 

The region has an average annual rainfall of 755.8 mm, distributed irregularly throughout the year. The rains are concentrated in the period from October to March, with the November-January quarter accounting for more than 50% of the average annual total rainfall. In the Araçuaí weather station, the annual average temperature is 25.0°C, with an average annual spread of around 12.2°C. The lowest temperatures occur in June and July (lows 15.9°C) and the highest in January and February (highs of 34.4°C). Table 16-27 shows the average climatic data for Aracuai between 1981 and 2010.

21501-REP-PM-001
Page | 309

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 
 

 

Table 16-27: Average climatic data for Araçuaí (1981-2010)

 

 

The estimates of monthly average precipitation will be used in future works to develop the studies of water balance of the Barreiro pit and estimation of the expected water volumes from the surface runoff for pumping system design.

 

The analysis of the mining plan and results of the mathematical modeling in permanent groundwater regime and the hydrological analysis above will allow the design of the drainage system of the Barreiro pit.

 

16.4.2.7.4Hydrogeology Conclusions

 

·Further hydrogeological studies will take place in 2022

·The model of the circulation and interaction of water is not expected to be different from what was obtained in the studies of the Xuxa Project

·The major difference between the Xuxa rock mass and the Barreiro rock mass is that the pegmatite at Xuxa is parallel to the schist foliation while the pegmatite at Barreiro crosscuts foliation. This cross-cutting feature can affect the level of fracturing, the depth of the alteration or even a separation of aquifers

·Operational problems caused by groundwater interference are not expected

·During the field study, no water springs related to any lithology were found. All secondary drainages were dry.

 

16.5Barreiro Mine Sequencing

 

In order to define the annual production plan, the following criteria were applied:

 

·Feed rate 1.80 Mtpa.

 

·Li2O feed grade: 1.40%.

 

·3.0% dilution rate.

21501-REP-PM-001
Page | 310

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 
 

 

·Mining recovery: 95%.

 

·Fines losses: 15%.

 

·DMS metallurgical recovery: 60.0%.

 

·Concentrate grade (Li2O): 6%.

 

·Product mass recovery

 

This study consisted of sequencing production, the definition of waste and ore, and the mining sequence of the waste rock blocks, in addition to the evolution of pit geometries throughout the mine life.

 

For the production development, the areas to be mined annually were established, generating operational plans for years 1 to 12.

 

Operational sequencing results can be found in Figure 16-41 to Figure 16-48 and Table 16-28.

 

Table 16-28: Barreiro Designed Mine Sequence

 

YEAR Classification Tonnes
(Mt)
Grade
LI2O
Diluted
3%
WASTE
(Mt)
Intermediate
Stripping
(Mt)
Total
Waste
(Mt)
Strip
Ratio*
Strip
Ratio
Total
Total
Mov.
(Mt)
1 Proven 1.68 1.33 18.00 - 18.00 9.93 9.93 19.82
Probable 0.14 0.84
Total 1.81 1.30
2 Proven 1.50 1.36 18.02 - 18.02 9.83 9.83 19.86
Probable 0.33 1.10
Total 1.83 1.31
3 Proven 1.70 1.43 18.59 - 18.59 10.08 10.08 20.43
Probable 0.14 1.46
Total 1.84 1.43
4 Proven 1.70 1.41 17.91 23.81 41.72 9.88 23.02 43.53
Probable 0.11 0.89
Total 1.81 1.38
5 Proven 1.78 1.39 16.47 21.02 37.48 9.10 20.72 39.29
Probable 0.03 0.98
Total 1.81 1.39
6 Proven 1.67 1.41 17.85 21.81 39.66 9.89 21.96 41.46
Probable 0.14 1.20
Total 1.81 1.39
7 - 10 Proven 5.73 1.36 84.67 - 84.67 11.57 11.57 91.99
Probable 1.58 1.26
Total 7.32 1.34
11 - 12 Proven 1.16 1.38 13.22 - 13.22 3.75 3.75 16.75
Probable 2.37 1.38
Total 3.53 1.38
Total Proven 16.93 1.38 204.73 66.63 271.37 9.41 12.47 293.13
Probable 4.83 1.29
Total 21.76 1.36

21501-REP-PM-001
Page | 311

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 
 

 

 

Figure 16-41: Barreiro Pit Year 1

 

 

Figure 16-42: Barreiro Pit Year 2

21501-REP-PM-001
Page | 312

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 16-43: Barreiro Pit Year 3

 

 

Figure 16-44: Barreiro Pit Year 4

21501-REP-PM-001
Page | 313

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 16-45: Barreiro Pit Year 5

 

 

Figure 16-46: Barreiro Pit Year 6

21501-REP-PM-001
Page | 314

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 16-47: Barreiro Pit Year 10

 

 

Figure 16-48: Barreiro Pit Year 12

21501-REP-PM-001
Page | 315

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

16.6Barreiro Mine Fleet

 

At the Barreiro Mine, the mining operations will be carried out by a third-party contractor, with proven experience with similar sized operations in Brazil. In order to select the mining operations contractor, operational work technical specifications were compiled and forwarded to the companies for technical and commercial proposals. After selecting the company and signing a contract, the work of mobilization and construction of the construction site will begin immediately.

 

The run of mine (ROM) ore will be drilled, blasted, loaded and transported by trucks to the ROM pad. The ore will be loaded by a wheel loader and fed into the primary crusher. The oversize material, >1000 mm, will be fragmented by a rockbreaker installed in the crusher protection grate. A minimum ore stockpile of around 30,000 t will be kept in the ROM yard, with the aim of stabilizing the supply of feed to the plant when the mine production rate decreases or stops. This also helps to maintain the mine’s ore production rate should the primary crusher have unscheduled production stops.

 

Ore below the cut-off grade will be blasted, loaded and transported to specifically delimited discharge points within the waste disposal pile.

 

The main mining activities will be:

 

Digging or rock blasting of ore and waste

 

Excavation, loading and transport of ore and waste

 

Disposal of ore in the ROM yard and waste in the waste dump

 

Construction and maintenance of all internal accesses to the pit(s) and the waste dumps

 

Maintenance of the floor, drainage, coating and signaling of all access roads used in the operation

 

Implementation and maintenance of the mine’s surface drainage systems at access points to the mining operation, waste deposit, ore yard and other areas linked to mining operations

 

Execution of mine infrastructure services, such as: construction and maintenance of accesses to the mining areas, crusher, waste dump, workshops and offices, mine drainage services, access signaling, mine dewatering, etc.

 

Feeding the primary crusher at an average rate of 320 t/hour, per wheel loader

 

Build and maintain the operation support facilities (offices, workshops, cafeteria, living quarters, warehouses, changing rooms, bathrooms, septic tanks, environmental, health and safety emergency (HSE), explosive magazine, electrical and hydraulic installations and others, in strict accordance with the Brazilian environmental standards and labour laws.

 

16.6.1Equipment

 

For the execution of mining activities, the equipment used must be in full working order, always observing the technical standards necessary for the services to be carried out safely. The equipment must comply with the respective Maintenance and Inspection Plans, as well as carrying out scheduled shutdowns for preventive and predictive maintenance. The proposed equipment to be used in the Mine will have high operational reliability and provide comfort and safety to operators.

21501-REP-PM-001
Page | 316

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 16-29 shows the main list of equipment to be used at Barreiro, while Table 16-30 shows the designed production of ore and waste and the percentage of material to be blasted.

 

Table 16-29: Barreiro Schedule of Primary Mining Equipment

 

Mining Fleet Year
1 2 3 4 5 6 7 8 9 10 11 12
Hydraulic Excavator 7 7 7 7 6 7 8 8 8 8 3 3
Haul Truck 40 40 43 45 43 52 58 58 58 58 26 25
Drilling Machine 9 9 9 9 8 9 10 10 10 10 4 4
Wheel Loader 1 1 1 1 1 1 1 1 1 1 1 1
Bulldozer CAT D8 T - Caterpillar 4 4 4 4 3 4 4 4 4 4 2 2
Bulldozer CAT D6 T - Caterpillar 4 4 4 4 3 4 4 4 4 4 2 2
Grader - Komatsu 2 2 2 2 2 2 3 3 3 3 1 1
Operation Support Truck - Scania 2 2 2 2 2 2 3 3 3 3 1 1
Water Truck (20.000 l) - Mercedes 4 4 4 4 3 4 4 4 4 4 2 2
Backhoe Excavator - JVC 2 2 2 2 2 2 2 2 2 2 2 2
Hydraulic Hammer - Komatsu 2 2 2 2 2 2 3 3 3 3 1 1
Forklift - Hyster 2 2 2 2 2 2 3 3 3 3 1 1
Blasting Support Truck - Scania 2 2 2 2 2 2 3 3 3 3 1 1
Fuel and Lube Truck - Mercedes 2 2 2 2 2 2 3 3 3 3 1 1
Maintenance Support Truck - Crane Mercedes 2 2 2 2 2 2 3 3 3 3 1 1
Crane (30 t of capacity) - SANYI 1 1 1 1 1 1 1 1 1 1 1 1
Portable Lightning Tower - Pramac 7 7 7 7 6 7 8 8 8 8 3 3
Light Vehicle - Mitsubish 7 7 7 7 6 7 8 8 8 8 3 3
Total 100 100 103 105 96 112 129 129 129 129 56 55

21501-REP-PM-001
Page | 317

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 16-30: Ore and Waste Production and percentage of material to be blasted Barreiro Pit

 

Production / Year 1 2 3 4 5 6 7 8 9 10 11 12 Total
Total ROM x 1.000 t - Wet Basis 1 909 1 931 1 941 1 908 1 904 1 901 1 925 1 925 1 925 1 925 1 895 1 819 22 908
ROM to Stock 1 909 1 931 1 941 1 908 1 904 1 901 1 925 1 925 1 925 1 925 1 895 1 819 22 908
ROM - Stock to Plant 1 909 1 931 1 941 1 908 1 904 1 901 1 925 1 925 1 925 1 925 1 895 1 819 22 908
 
Total Waste x 1.000 t - Wet Basis 18 953 18 973 19 564 43 913 39 458 41 744 22 282 22 282 22 282 22 282 6 958 6 958 285 649
Waste 18 953 18 973 19 564 18 851 17 332 18 791 22 282 22 282 22 282 22 282 6 958 6 958 215 509
Waste - Pushback       25 061 22 126 22 953             70 140
 
Hard Ore o be blasted x 1.000 t 1 909 1 931 1 941 1 908 1 904 1 901 1 925 1 925 1 925 1 925 1 895 1 819 22 908
Hard Waste to be blasted x 1.000 t 14 290 14 973 16 473 37 361 33 918 35 516 19 154 19 742 19 742 19 742 6 165 6 165 243 241
Total to be blasted 16 200 16 904 18 414 39 269 35 822 37 417 21 079 21 667 21 667 21 667 8 060 7 984 266 149
 
% Hard ROM 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
% Hard Waste 75% 79% 84% 85% 86% 85% 86% 89% 89% 89% 89% 89% 85%
Stripping Ratio (t/t) 9.93 9.83 10.08 9.88 9.10 9.89 11.57 11.57 11.57 11.57 3.67 3.83 9.41
Stripping Ratio Pushback Waste (t/t)       13.14 11.62 12.08             3.06
Stripping Ratio General (t/t) 9.93 9.83 10.08 23.02 20.72 21.96 11.57 11.57 11.57 11.57 3.67 3.83 12.47
 
Total Earthmoving x 1,000 t 20 862 20 904 21 505 45 820 41 362 43 645 24 207 24 207 24 207 24 207 8 853 8 777 308 557

21501-REP-PM-001
Page | 318

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

16.6.2Operations

 

Mining will commence after the removal and storage of topsoil and waste overburden material. Small excavators will be used initially for drainage work, digging trenches, minor material removal and material disposal. An excavator with a bucket capacity of 4.4 m3 has been selected for digging and loading. For transport, road trucks (8X4) with a capacity of 40 t are planned.

 

16.6.2.1Loading, Transporting and Unloading

 

The ore and waste will be blasted, loaded by excavators, transported by trucks with a capacity of 40 t and unloaded on the ROM pad and waste dump respectively. If necessary, a hydraulic rockbreaker will be used to break rock larger than the opening of the crusher’s fixed protection grid.

 

The process plant will be fed at an average rate of 320 t/hr, 24 hours per day, 7 days per week.

 

It is estimated that 100% of the ore, 85% of the waste must be blasted using explosives.

 

As an initial premise, a drilling diameter of 4.5 inches was adopted for ore with 5-metre-high benches and 4.5 inches for waste in 10-metre-high benches.

 

A careful analysis of the characteristics of the Barreiro Mine was performed to determine the most appropriate drilling equipment, as shown in Table 16-31.

 

Table 16-31: Drilling Equipment for Barreiro Pit

 

Brand Model Diameter Type
mm inch
Atlas Copco F9/T45 102 to 140 4.5 Production

 

The drilling operation will be supported by a bulldozer and/or hydraulic excavator to carry out cleaning activities in the drilling areas, construction of access points to the drilling area, as well as the use of a hydraulic hammer coupled to the hydraulic excavator for rock handling in the operational area.

 

The rock blasting work comprises primary and secondary blasting and a hydraulic hammer will be used as required.

 

16.6.3Explosives Supply

 

The provision of explosives and the execution of blasting services will be carried out by a subcontractor specializing in blasting, under the guidance of Sigma.

 

For the Barreiro Mine, where appropriate, pumped explosives, stemming and non-electrical accessories will be used.

 

During the mine operation, the daily blasting plans will be prepared by Sigma´s technical team and the results will be evaluated, and any necessary adjustments made to improve blasting effectiveness.

 

16.6.4Explosives Magazine and Accessories

 

The explosive magazines will be supplied and built by the company contracted to perform the mining activities. This company will supply and maintain a remote security system, following the guidelines of ORDINANCE No. 147 - COLOG, of November 21, 2019, which provides the administrative procedures for the use and storage of explosives and accessories, as well as ORDINANCE No. 56 - COLOG, of June 5, 2017, which provides the administrative procedures related to registration with the army for the use and storage of army-controlled products (PCE).

21501-REP-PM-001
Page | 319

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Area security will be established through compliance with the minimum distances from the storage location to inhabited areas, railways, or highways, according to distances established in the regulation for the Inspection of Controlled Products (R-105). To this end, the plan for transporting, handling and storage of explosives and explosive accessories will be reviewed by Sigma management together with GE21 so that all conditions are fully complied.

 

The security of products controlled by the army (PCE) will be guaranteed through the adoption of measures against deviations, loss, theft, and theft against obtaining knowledge about activities with PCE, in order to avoid their use in the practice of illicit acts. These measures will be included in the Security Plan.

 

Access control will be carried out electronically, 24 hours a day, covering storage and access areas. For this, cameras connected to a remote base will be used and monitored online.

 

The facilities will undergo regular internal inspection to ensure the integrity of the active and passive protection systems. In the case of accidents of any nature, the Security Plan will determine the procedures related to the simultaneous activation of the competent public security bodies, including military and civil police, army and fire department.

 

Contingency measures will be adopted in the event of accidents or detection of illegal practices with explosives, including information to the inspection of army-controlled products (PCE). In these situations, quick and safe activation of the monitoring center and competent authorities listed in the Security Plan will be adopted.

 

For the storage of explosive and blasting accessories, a Rustic Mobile Storage container, installed in accordance with Technical-Administrative Instruction No. 18/99-DFPC, is planned as shown in Figure 16-49. This structure consists of a box truck or adapted container located in a fenced and monitored area, under the same security and monitoring conditions applied to the explosive magazine as shown in, Figure 16-50.

 

 

Figure 16-49: Explosives Magazines in Container

21501-REP-PM-001
Page | 320

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 16-50: Example of Ammonium Nitrate Emulsion Storage Structure

 

16.6.5Fleet Monitoring System

 

The fleet monitoring system (dispatch) to the Barreiro Mine will be carried out through an electronic system that allows the monitoring and management of the mine’s operation in real time. Sigma will work with solutions that allow for the monitoring, management, and optimization of the truck fleet. Using the most advanced hardware, the software monitors and manages each piece of equipment at all stages of the mining production cycle. The software uses algorithms that provide solutions to maximizing productivity and reduce operating costs.

 

A monitoring device is installed in each piece of equipment (excavator and truck) that is responsible for sending various information to control centre, including: location, status of equipment, etc. A communication network will be established between the monitoring equipment, antennas, and the control centre, this enables the monitoring of the entire mine fleet, operations and production with a high level of detail.

 

16.6.6Work Shifts

 

The mine workforce teams will work in various shift schedules. The administrative group will work 9 hours a day from Monday to Friday, with 1 hour off for a meal, and 4 hours on Saturday mornings. The operational team will work 7 days a week, 24 hours a day, in a 6x2 shift scheme, where the employees work 6 days consecutively, for 9 hours per shift, and then have 2 days off. This method of shift work provides uninterrupted work and is in accordance with Brazilian labour legislation. The explosives supplier will work 5 days per week, taking Saturdays and Sundays off.

 

16.6.7Labour Mining

 

Sigma is committed to prioritizing the hiring of local labour.

21501-REP-PM-001
Page | 321

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 16-32 lists the expected annual labour requirements for the 12 years of mine life; these expectations will be adjusted as required during the mining operation.

 

Table 16-32: Barreiro Staffing Schedule

 

Position Shift
Teams
Year
Operation Team     1 2 3 4 5 6 7 8 9 10 11 12
General Manager 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Mine Operation Manager 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Maintenance Manager 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Environmental & Safety Manager 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Production Coordinator 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Infrastructure Coordinator 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Maintenance Coordinator 1 1 3 3 3 3 3 3 3 3 3 3 3 3
Mining Planning Coordinator 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Production Supervisor 3 4 4 4 4 4 4 4 4 4 4 4 4 4
Infrastructure Supervisor 3 4 4 4 4 4 4 4 4 4 4 4 4 4
Maintenance Supervisor 1 1 3 3 3 3 3 3 3 3 3 3 3 3
Dispatcher 3 4 4 4 4 4 4 4 4 4 4 4 4 4
Training & Development Technician 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Environment & Safety Coordinator 1 1 2 2 2 2 2 2 2 2 2 2 2 2
Hydrology & Geotechnical Coordinator 1 1 2 2 2 2 2 2 2 2 2 2 2 2
Junior Geotech Engineer 1 1 2 2 2 2 2 2 2 2 2 2 2 2
Senior Mine Engineer 1 1 2 2 2 2 2 2 2 2 2 2 2 2
Mine Planner 1 1 2 2 2 2 2 2 2 2 2 2 2 2
Mine Field Engineer 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Drill & Blast Engineer 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Surveyor 1 1 2 2 2 2 2 2 2 2 2 2 2 2
Assistant Surveyor 1 1 4 4 4 4 4 4 4 4 4 4 4 4
Senior Geologist 1 1 2 2 2 2 2 2 2 2 2 2 2 2
Geologist 1 1 2 2 2 2 2 2 2 2 2 2 2 2
Shift Coordinator Quality 3 4 4 4 4 4 4 4 4 4 4 4 4 4
Ore Sampler 3 4 8 8 8 8 8 8 8 8 8 8 8 8
Senior Maintenance Engineer 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Junior Maintenance Engineer 1 1 3 3 3 3 3 3 3 3 3 3 3 3
Maintenance Senior Technician 1 1 4 4 4 4 4 4 4 4 4 4 4 4
Field Inspector 1 1 2 2 2 2 2 2 2 2 2 2 2 2
Part Coordinator 1 1 2 2 2 2 2 2 2 2 2 2 2 2
Contract Coordinator 1 1 2 2 2 2 2 2 2 2 2 2 2 2
Sub Total     74 74 74 74 74 74 74 74 74 74 74 74
                             

21501-REP-PM-001
Page | 322

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Operators Team                            
Hydraulic Excavator 3 4 28 28 28 28 24 28 32 32 32 32 12 12
Haul Truck 3 4 131 131 141 148 141 171 190 190 190 190 85 82
Drilling Machine 3 4 36 36 36 36 32 36 40 40 40 40 16 16
Wheel Loader 3 4 4 4 4 4 4 4 4 4 4 4 4 4
Bulldozer CAT D8 T - Caterpillar 3 4 16 16 16 16 12 16 16 16 16 16 8 8
Bulldozer CAT D6 T - Caterpillar 3 4 16 16 16 16 12 16 16 16 16 16 8 8
Grader -  Komatsu 3 4 8 8 8 8 8 8 12 12 12 12 4 4
Operation Support Truck - Scania 2 2 4 4 4 4 4 4 6 6 6 6 2 2
Water Truck (20.000 l) - Mercedes 3 4 16 16 16 16 12 16 16 16 16 16 8 8
Backhoe Excavator - JVC 1 1 2 2 2 2 2 2 2 2 2 2 2 2
Hydraulic Hammer - Komatsu 1 1 2 2 2 2 2 2 3 3 3 3 1 1
Fork Lift - Hyster 1 1 2 2 2 2 2 2 3 3 3 3 1 1
Blasting Support Truck - Scania 1 1 2 2 2 2 2 2 3 3 3 3 1 1
Fuel and Lube Truck - Mercedes 2 2 4 4 4 4 4 4 6 6 6 6 2 2
Maintenance Support Truck Crane Mercedes 2 2 4 4 4 4 4 4 6 6 6 6 2 2
Crane (30 t of capacity) - SANYI 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Detonation operator 1 2 12 12 12 12 12 12 12 12 12 12 12 12
Team in Holidays 1 1 26 26 27 28 25 30 33 33 33 33 15 15
Sub Total Operation     314 314 325 332 303 357 402 402 402 402 185 181
Maintenance team                            
Mechanical Technician 3 4 29 29 30 30 28 33 38 38 38 38 17 16
Electrical Technician 3 4 6 6 6 6 6 7 8 8 8 8 3 3
Welding Technician 2 2 6 6 6 6 6 7 8 8 8 8 3 3
Fueling / Lube 3 4 14 14 14 15 13 16 18 18 18 18 8 8
Tyre Repair 2 2 4 4 4 5 4 5 6 6 6 6 3 2
Maintenance Assistant 1 1 4 4 4 5 4 5 6 6 6 6 3 2
Management and Maintenance Control 1 1 4 4 4 5 4 5 6 6 6 6 3 2
Team in Holidays     6 6 6 6 6 7 8 8 8 8 4 3
Sub total Maintenance     73 73 75 77 71 83 96 96 96 96 42 42
Total General     461 461 475 483 448 514 571 571 571 571 301 297

21501-REP-PM-001
Page | 323

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

16.6.8Labour and Equipment

 

For the mobilization of technical and operational personnel, priority will be given to local people and those living near to Araçuaí & Itinga Municipalities, and the following criteria:

 

·Recruitment

·Selection

·Conducting admission exams

·Sigma integration

·Introductory equipment/vehicle training

·Initiation into assisted operation

·Final aptitude test

 

16.6.9Site Construction

 

The site construction shall consist of:

 

·Mine Office

·Meeting room

·Control room

·Auditorium

·Cafeteria

·Changing rooms

·First aid post

·Warehouse

·Workshop

·Washing ramp

·Oil and grease storage area

·Fuel storage area

·Recreation area

·Explosive magazine

 

The total area of infrastructure will be approximately 1,390 m², and the total area that the buildings will occupy is approximately 1.5 hectares.

 

All built-up areas will have waterproof flooring, so that there is no risk of soil contamination from the operations, especially in the workshop and washing ramp. The runoff from the roofs will be drained into the gutters to supply the cistern, which will be used at the washing ramp. After using the water in the washing ramp, the water will be sent to the effluent treatment station, which starts in the decanter, followed by the oil and grease separator box with capacity of 20 m³/day.

 

The water and oil separator system must operate at a flow rate of 20 m³/day, which complies with the ABNT NBR 14605 standard and the ASTM D 6104/03 international standard. The analysis standards to verify the efficiency and quality of the water must follow the CONAMA Resolution No. 357/2005 for the parameters of oils and greases. After treatment the water will be pumped back to the process water tank.

 

16.6.10Wastewater Treatment

 

Step 1: The effluent from the drains (channels) from the workshop, washing ramp and oil deposit, oil and grease separator stage, will be drained to the decanter where it will undergo the first sedimentation process. The process consists of separating solid particles from water by the action of gravity. The flow velocity of the liquid is reduced, favoring the sedimentation of these particles. The water enters the next step, which further separates the suspended solids. The solids from the first process are deposited at the bottom of the decanter, where they will be periodically removed.

21501-REP-PM-001
Page | 324

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Step 2: In the module for separation of solids (MSS) the solids coming from the water used to wash the equipment are separated by the process of gravity and sedimentation of the particles. This process removes the remaining particulate matter suspended in the fluid, allowing oil and water to flow to the next stage, avoiding the silting of the remaining procedure. Solids will be removed and stored in an appropriate place.

 

Step 3: The water and oil separator box (WOSB) receive all the effluent from the MSS process. This system has, among others, two basic constituents: water and oil. The process of separating water and oil occurs by density difference. The clean water will be released into the rainwater drainage network. Periodically (biannually) samples will be collected at the final outlet, the third box of the water and oil separation system, so that the efficiency of the system and the quality of the effluent is known.

 

Step 4: The supernatant oil goes to the oil collection reservoir (OCR) to be removed and sent for recycling. Used oils will be sent to a certified and approved company, with the relevant documentation and authorization, in accordance with the applicable legal requirements. Likewise, tailings will be monitored, in relation to quantity and classification, and recorded in the waste inventory worksheet of the Sigma integrated management system.

 

Step 5: Contaminated oil and grease residues (Class I) must be packed in properly identified drums and sent to an appropriate collection company. This waste output will be registered by Sigma by filling out the waste transport manifest (MTR), according to the waste management procedure.

 

Figure 16-51 shows a schematic of the model to be built for the water treatment of effluent from the washing ramp and the modules of the water and oil separator box.

 

 

Figure 16-51: Schematic of Wash Ramp Oil-Water Separator

 

16.6.11Solid Waste Management

 

To meet the demand for internal solid waste generation, Sigma will have a waste deposit located next to the oil storage structure, physically separated in accordance with safety standards, such as physical divisions, roof, waterproofed floor, channels, and drains. Next to this will be located waste disposal bays for items such as plastic, paper/cardboard, metals, glass, and contaminated waste (towels, filters, PPE, etc.). Tires must be stored inside the warehouse until they are sent to their final destination off site. Organic waste must be delivered to locations properly prepared to receive this type of material. Figure 16-52 shows the solid waste temporary storage layout.

21501-REP-PM-001
Page | 325

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

According to ABNT NBR 10.004 - Waste Classification, waste must be collected, segregated/packaged, and sent to the final destination, to companies licensed by the appropriate environmental agency. Periodically, Sigma will be monitoring their waste generation, and checking the internal waste inventory worksheet, a tool that it uses within the integrated management system.

 

 

Figure 16-52: Schematic of Solid Waste Temporary Storage Facility

 

16.6.12Site Access

 

The construction of site access necessary to start ore mining operations, waste removal, access to the waste dump and marginal ore, auxiliary accesses and others that may be required will be carried out according to the specific project’s requirements.

 

If necessary, land clearing, including the removal of trees, undergrowth and debris will be performed using a D6T crawler tractor with ripper. The material removed will be loaded with a 35 t excavator and transported with trucks with a capacity of 20 m³.

 

The leveling of accesses, considering slope and slope for land drainage will be carried out through cutting and filling using a D6T crawler tractor, 35 t and 55 t excavator, 20 m³ trucks, grader and water trucks. Low strength soils will be replaced. Surface drainage and construction of berms will be carried out with a 20 t excavator.

 

16.6.13Road Construction and Maintenance

  

The construction and maintenance of site roads will require the following:

 

·Initial construction of the roads

·Water and storm drainage

21501-REP-PM-001
Page | 326

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

·Construction of safety berms

·Reflective signage

·Dust suppression

 

16.6.14Excavation, Loading, Transport and Soil Treatment

 

The excavation stage will start after the removal and storage of the topsoil.

 

As the excavation progresses, drainage systems will be installed to avoid the accumulation of rainfall.

 

It is planned to mobilize a backhoe excavator for drainage services, trench excavation, material disposal and small handling. 70 t excavators will be used according to the volume requirements for large and medium volumes. For transport, 8x4 trucks, with a capacity of 40t, will be used, allowing for productivity and safety.

 

16.6.15Drilling and Blasting

 

The geology and rock types at the Barreiro Mine are crucial for defining drilling and blasting parameters, which relates to mining recovery.

 

It is important to know the limits of the ore body to minimize dilution and losses. Sigma will have a geologist as part of its technical staff who will work directly with the drilling, blasting and loading teams. Employees who are directly involved in activities related to optimizing the mining recovery, such as drill operators, drilling assistants, rock blasting team, and excavator operators, will be trained to recognize minerals to avoid deviation from planned mineral boundaries.

 

As this is a greenfield project, it is foreseeable that Sigma’s technical teams will go through a learning period based on the empirical results acquired with operation commencement. Naturally, changes to rock blast parameters and operating methods will be required. Consideration should be given not only to the complexity of the geological formation and the operational challenges resulting from this condition, but also to the context of the environment in which the mine will be located.

 

Previous studies (pre-blast survey) before the first blasting should be developed to establish the minimum distances between pre-existing structures that will be kept and the blasted benches. As a result, restrictions or opportunities relating to the maximum load per drill hole may be revealed, which may indicate the maximum blasthole diameter, as well as the type of accessories used. These factors, among others, may imply technical and commercial adjustments throughout the life of the mine operation. Table 16-33 and Table 16-34 detail the drilling and blasting for ore and waste respectively.

21501-REP-PM-001
Page | 327

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 16-33: Barreiro Preliminary Drill and Blast Plan - Ore

  

Drilling and Blasting Rock Parameters Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11 Year 12
Ore m³ in situ 664 713 672 269 675 768 664 215 662 877 661 666 670 242 670 242 670 242 670 242 659 649 633 277
Ore kt 1 909 1 931 1 941 1 908 1 904 1 901 1 925 1 925 1 925 1 925 1 895 1 819
Average Density t/m³ 2.87 2.87 2.87 2.87 2.87 2.87 2.87 2.87 2.87 2.87 2.87 2.87
Hole Diameter inch 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5
Burden m 2.6 2.6 2.6 2.6 2.6 2.6 2.6 2.6 2.6 2.6 2.6 2.6
Spacing m 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
Blast Pattern 9.10 9.10 9.10 9.10 9.10 9.10 9.10 9.10 9.10 9.10 9.10 9.10
Spacing/Burden - 1.35 1.35 1.35 1.35 1.35 1.35 1.35 1.35 1.35 1.35 1.35 1.35
Subdrilling m 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4
Bench height m 5 5 5 5 5 5 5 5 5 5 5 5
Total Hole Length m 5.40 5.40 5.40 5.40 5.40 5.40 5.40 5.40 5.40 5.40 5.40 5.40
Volume per Hole 49.14 49.14 49.14 49.14 49.14 49.14 49.14 49.14 49.14 49.14 49.14 49.14
Mass per Hole t 141.15 141.15 141.15 141.15 141.15 141.15 141.15 141.15 141.15 141.15 141.15 141.15
m³ Blasted/m Drilled m³/m 9.10 9.10 9.10 9.10 9.10 9.10 9.10 9.10 9.10 9.10 9.10 9.10
Specific Drilling m/m³ 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11
Specific Drilling m/t 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038 0.038
Drilled Metres m 73 045 73 876 74 260 72 991 72 844 72 711 73 653 73 653 73 653 73 653 72 489 69 591
Necessary Holes hole 13 527 13 681 13 752 13 517 13 490 13 465 13 639 13 639 13 639 13 639 13 424 12 887
Explosive Density g/cm³ 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21
Linear Load Ratio kg/m 10.79 10,79 10.79 10,79 10.79 10,79 10.79 10,79 10.79 10,79 10.79 10,79
Top Stemming m 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70
Explosive Column m 4.70 4.70 4.70 4.70 4.70 4.70 4.70 4.70 4.70 4.70 4.70 4.70
Load per Hole kg 58.28 58.28 58.28 58.28 58.28 58.28 58.28 58.28 58.28 58.28 58.28 58.28
Load Ratio kg/m³ 1.19 1.19 1.19 1.19 1.19 1.19 1.19 1.19 1.19 1.19 1.19 1.19
Load Ratio kg/t 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41

21501-REP-PM-001
Page | 328

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 16-34: Barreiro Preliminary Drill and Blast Plan – Waste

 

Drilling and Blasting Rock Parameters Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11 Year 12
Waste m³ in situ 6 105 838 6 397 699 7 038 521 15 963 267 14 492 163 15 175 085 8 183 867 8 435 209 8 435 209 8 435 209 2 634 076 2 634 076
Waste kt 14 290 14 973 16 473 37 361 33 918 35 516 19 154 19 742 19 742 19 742 6 165 6 165
Average Density t/m³ 2.34 2.34 2.34 2.34 2.34 2.34 2.34 2.34 2.34 2.34 2.34 2.34
Hole Diameter inch 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5
Burden m 3.20 3.20 3.20 3.20 3.20 3.20 3.20 3.20 3.20 3.20 3.20 3.20
Spacing m 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Blast Pattern 12.80 12.80 12.80 12.80 12.80 12.80 12.80 12.80 12.80 12.80 12.80 12.80
Spacing/Burden - 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25
Subdrilling m 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Bench height m 10 10 10 10 10 10 10 10 10 10 10 10
Hole Length m 10.80 10.80 10.80 10.80 10.80 10.80 10.80 10.80 10.80 10.80 10.80 10.80
Volume per Hole 138.24 138.24 138.24 138.24 138.24 138.24 138.24 138.24 138.24 138.24 138.24 138.24
Mass per Hole t 323.54 323.54 323.54 323.54 323.54 323.54 323.54 323.54 323.54 323.54 323.54 323.54
m³ Blasted/m Drilled m³/m 12.80 12.80 12.80 12.80 12.80 12.80 12.80 12.80 12.80 12.80 12.80 12.80
Specific Drilling m/m³ 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08
Specific Drilling m/t 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033
Drilled Metres m 477 019 499 820 549 884 1 247 130 1 132 200 1 185 554 639 365 659 001 659 001 659 001 205 787 205 787
Necessary Holes hole 44 168 46 280 50 915 115 475 104 833 109 773 59 200 61 019 61 019 61 019 19 054 19 054
Explosive Density g/cm³ 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21
Linear Load Ratio kg/m 10.79 10,79 10.79 10,79 10.79 10,79 10.79 10,79 10.79 10,79 10.79 10,79
Top Stemming m 1.40 1.40 1.40 1.40 1.40 1.40 1.40 1.40 1.40 1.40 1.40 1.40
Explosive Column m 9.40 9.40 9.40 9.40 9.40 9.40 9.40 9.40 9.40 9.40 9.40 9.40
Load per Hole kg 116.55 116.55 116.55 116.55 116.55 116.55 116.55 116.55 116.55 116.55 116.55 116.55
Load Ratio kg/m³ 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84
Load Ratio kg/t 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.36

21501-REP-PM-001
Page | 329

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Based upon the rock characteristics and operating parameters, the top hammer drilling method has been chosen as the optimal method. Due to experience with and availability of the equipment, tools, original replacement parts, and technical services, the authors recommend the Atlas Copco equipment listed in Table 16-35.

 

Table 16-35: Barreiro Recommended Drill Rig

 

Brand Model Diameter Type
mm inch
Atlas Copco F9/T45 102 to 140 4.5 to 5.5 Production

 

Using the parameters established for blasting, it was possible to calculate the number of drills needed to meet the planned production schedule for the Barreiro Mine as shown in Table 16-36.

 

If it is necessary to implement different grids than was originally planned or to add slope preservation methods, such as damping lines, pre-cut or post-cut, the amount of drilling will tend to increase. Should an increase in the amount of drilling be required, the fleet and staff will be adequate to meet this demand.

 

The proposed top hammer drills have an operating cabin with ROPS/FOPS certification, air conditioning, acoustic insulation system, dust collector, hole cleaning air monitoring system, rod greasing system, angle and depth gauge, and water injection for dust control.

 

The drilling operation will be supported by a bulldozer and/or hydraulic excavator to carry out the cleaning and preparation of the drilling benches, access construction to the drilling benches, as well as a hydraulic rock breaker coupled to the hydraulic excavator to remove blocks in the operational area.

21501-REP-PM-001
Page | 330

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 16-36: Barreiro Preliminary Calculations for Drilling Requirements

 

Drilling Sizing Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11 Year 12
Blasted Material kt 20 862 20 904 21 505 20 759 19 236 20 692 24 207 24 207 24 207 24 207 8 853 8 777
Days / Year quantity 365 365 366 365 365 365 365 365 365 365 365 365
Shifts / Day quantity 3 3 3 3 3 3 3 3 3 3 3 3
Hours / Shift quantity 8 8 8 8 8 8 8 8 8 8 8 8
FA - Physical Availability % 82% 82% 82% 82% 82% 82% 82% 82% 82% 82% 82% 82%
Hours Available hours 7 183 7 183 7 183 7 183 7 183 7 183 7 183 7 183 7 183 7 183 7 183 7 183
Unproductive Hours hours 4 791 4 791 4 791 4 791 4 791 4 791 4 791 4 791 4 791 4 791 4 791 4 791
Utilization % 85% 85% 85% 85% 85% 85% 85% 85% 85% 85% 85% 85%
Efficiency Factor % 65% 65% 65% 65% 65% 65% 65% 65% 65% 65% 65% 65%
Drillholes per hour - Ore Drill/h 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7
Drillholes per hour - Waste Drill//h 1.9 1.9 1.9 1.9 1.9 1.9 1.9 1.9 1.9 1.9 1.9 1.9
Meters drilled per hour m/h 20 20 20 20 20 20 20 20 20 20 20 20
Drilling Productivity - Ore Mtpy 2.07 2.07 2.07 2.07 2.07 2.07 2.07 2.07 2.07 2.07 2.07 2.07
Drilling Productivity - Waste Mtpy 2.38 2.38 2.38 2.38 2.38 2.38 2.38 2.38 2.38 2.38 2.38 2.38
Effective Hours Worked hours 3 969 3 969 3 969 3 969 3 969 3 969 3 969 3 969 3 969 3 969 3 969 3 969
Tonnage per drillhole - Ore t/Drill 141 141 141 141 141 141 141 141 141 141 141 141
Tonnage per drillhole - Waste t/Drill 324 324 324 324 324 324 324 324 324 324 324 324
Equipment Numbers Required quantity 9 9 9 9 8 9 10 10 10 10 4 4

21501-REP-PM-001
Page | 331

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

16.6.16Explosives Consumption

 

The consumption of explosives and accessories was calculated based on the parameters of the blasting plans presented above in Table 16-33 and Table 16-34. The tables below, Table 16-37 and Table 16-38 show the estimated annual consumption of pumped explosives, non-electrical accessories, and remote activation through electronic fuse for ore, waste and the combined totals respectively. In addition, small allowances for explosives and accessories were included, for secondary blasting of oversize rock.

21501-REP-PM-001
Page | 332

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 16-37: Barreiro Estimated Annual Consumption of Explosives - Ore

 

Rock Blasting / Pumped Emulsion Blaster + Non-Electric / Bulk Emulsion + Non-Electric  
 
Ore  
Item / Quantities Unit Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11 Year 12 Total  

60% Emulsion/40%

ANFO - 1.21 g/cm3

Kg x 1,000 788 797 801 788 786 785 795 795 795 795 782 751 9 458  
Booster 250 g unit 12 174 12 313 12 377 12 165 12 141 12 118 12 275 12 275 12 275 12 275 12 081 11 598 146 070  
Detonating cord m 47 344 47 882 48 132 47 309 47 213 47 127 47 738 47 738 47 738 47 738 46 984 45 105 568 049  
Non-Electric detonator unit 332 336 338 332 331 331 335 335 335 335 330 317 3 988  
Burning fuse unit 260 260 260 260 260 260 260 260 260 260 260 260 3 120  
Powder Factor Kg/t 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41  

 

Table 16-38: Barreiro Estimated Annual Consumption of Explosives - Waste

 

Rock Blasting / Pumped Emulsion Blaster + Non-Electric / Bulk Emulsion + Non-Electric  
 
Waste  
Item / Quantities Unit Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11 Year 12 Total  

60% Emulsion/40%

ANFO - 1.21 g/cm3

Kg x 1,000 5 148 5 394 5 934 13 459 12 218 12 794 6 900 7 112 7 112 7 112 2 221 2 221 87 624  
Booster 250 g unit 39 752 41 652 45 824 103 928 94 350 98 796 53 280 54 917 54 917 54 917 17 149 17 149 676 629  
Detonating cord m 176 674 185 119 203 661 461 900 419 333 439 094 236 802 244 074 244 074 244 074 76 217 76 217 3 007 240  
Non-Electric detonator unit 3 053 3 199 3 519 7 982 7 246 7 588 4 092 4 218 4 218 4 218 1 317 1 317 51 965  
Burning fuse unit 260 260 260 260 260 260 260 260 260 260 260 260 3 120  
Powder Factor Kg/t 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.36  

21501-REP-PM-001
Page | 333

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

16.6.17Blasting Plan

 

During the operation, the daily blast plans will be prepared by the explosive supplier’s technical staff. These plans will be analysed and validated by the Sigma rock blasting team.

 

After each blast, the blast plan will be updated according with the equipment quantities actually used. Physical and digital copies of all generated documentation will be kept, which will be available for audits or inspection by regulatory bodies.

 

16.6.18Execution of Blasting

 

Rock blasts will be carried out on scheduled dates, the frequency of which will meet the demand for blasted ore and waste.

 

For all rock blasting, the authorities will also be previously communicated through the Rock Blasting Notice, as per Annex of ORDINANCE No. 147 - COLOG, of November 21, 2019.

 

16.6.19Fragmentation Control

 

The fragmentation control will be carried out through specialized software, generating granulometric distribution curves from photographic records. This monitoring allows for blast pattern adjustments, sequencing and other parameters according to the results history. Monitoring will be carried out on a monthly basis for rock blasting and/or whenever the contractor’s technical team deems is necessary to optimize the operation.

 

Figure 16-53 shows an example of image analysis and particle size distribution calculation using granulometric distribution curves.

 

The blasts will be filmed with high-definition cameras that allow a detailed visual assessment of factors such as detonation sequencing, mass displacement, top stemming efficiency and ultra-launch.

 

 

Figure 16-53: Image Analysis and Calculation of Granulometric Distribution

21501-REP-PM-001
Page | 334

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

17RECOVERY METHODS

 

17.1Processing Overview

 

The Xuxa concentrator will be located approximately 1.5 km northeast of the Xuxa open pits. The spodumene concentrate will be produced by DMS. The DMS plant is designed based on Xuxa design parameters and will produce a spodumene concentrate with a target grade of 6.0% Li2O. The Xuxa plant throughput capacity is based on 1.5 Mtpa (dry) of ore fed to the crushing circuit.

 

A second DMS concentrator would be constructed to process the Barreiro ore (Phase 2). This plant would produce a spodumene concentrate with a target grade of 6.0% Li2O from an ore grade of 1.39% Li2O (diluted). The Barreiro plant throughput capacity is based on 1.85 Mtpa (dry) of ore fed to the crushing circuit.

 

17.2Xuxa Front-End Engineering Design (FEED) Update

 

As part of the Xuxa Front-End Engineering Design (FEED) Phase 1, a number of studies were completed to define and plan the scope of work for Phase 2 and to validate the DFS design. Additionally, the studies assisted in developing a project execution strategy to both complete FEED activities and delivery of the Project.

 

Studies undertaken

 

·Build Own Operate (BOO) Crushing Facility Review

·Crusher ore storage & reclaim review

·DMS ultrafines circuit review

·Cost comparison of 220 ktpa vs 440 ktpa DMS

·Infrastructure review

·Emergency power review

·Iron removal review

·Dry stacking review

·Plant and buildings review

 

These studies have been summarised into the recommendations which have been adopted for Xuxa Phase 1 and further project expansions.

 

17.2.1Crushing and Materials Handling

 

The Xuxa primary crushing circuit design was upgraded to accommodate 1.7 Mtpa (dry) throughput over the DFS nominal value of 1.5 Mtpa (dry) to allow for variations in ore head grade, feed particle size distribution (PSD) and mineralogy. Additionally, the future expansion case will require an additional crushing facility.

 

A commercial decision to change from semi-mobile outsourced crushing plant to the purchase and installation of a permanent crushing and screening plant operated and maintained by Sigma Lithium. The revised crushing circuit also eliminates the need for medium voltage (4.16 kV) distribution.

 

In order to minimise fines generation, the primary crusher top size of 600 mm was increased to accommodate a larger feed top size of 1000 mm, enabling a lower blasting powder factor to be utilised by mining.

 

The layout of the crushing circuit was revised to minimise potential re-crushing of -9.5 mm material.

 

The 2019 DFS design was for crushed ore to be stockpile and then reclaimed with the aid of a front-end loader. The design was revised to include a crushed ore bin with underflow stockpile and reclaim hopper and feeder to substantially reduce the need for permanent (24/7) front-end loader operation to feed the DMS circuit and reduce fines generation.

21501-REP-PM-001
Page | 335

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

17.2.2DMS Plant and Infrastructure

 

The study evaluated the cost and operating implications of installing an initial 220 ktpa DMS plant (Phase 1) with an additional duplicate 220 ktpa DMS plant (Phase 2) to be installed for the future expansion case compared to a single 440 ktpa DMS plant. While there were CAPEX and OPEX benefits to going to a single 440 ktpa plant, these differences fell within the overall accuracy of the estimates. The decision was taken to build two separate DMS plants to maintain the operational flexibility required to process Xuxa and Barreiro orebodies which have slight differences in ore characteristics. A single initial 220 ktpa product operating unit also provided the lowest initial CAPEX requirements.

 

Run of mine (ROM) ore and DMS feed particle size distributions were benchmarked against existing spodumene operations and a decision was made to adjust the coarse size fraction from -9.5 mm / + 6.3 mm to -9.5 mm / + 4.0 mm and the fine size fraction from -6.3 mm / +1.7 mm to -4.0 mm / +1.7 mm to allow for more even splits to the respective DMS circuits.

 

The DMS circuit was upgraded to accommodate 1.7 Mtpa (dry) throughput over the Phase 1 DFS value of 1.5 Mtpa (dry) with overall minimum spodumene concentrate production of 220,000 ktpa. This change resulted in flow through changes to the process water and fresh water requirements and the size of the HV transformer.

 

The ultrafines DMS circuit was upgraded from a single-stage circuit to incorporate primary and secondary ultrafines stages. The adoption of a two-stage ultrafines circuit, is in line with the second phase of testwork and provides a more robust flowsheet able to handle higher variability / lower grade material, and therefore mitigates against the risk of poor separation of the ultrafines fraction and the inability to produce a high-grade ultrafines product from variable ore quality.

 

Filtration test work was reviewed and repeated and a larger 25 m2 belt filter selected over the 7 m2 DFS unit for Xuxa only. An additional filter will be required for the Barreiro plant as a single larger unit for Xuxa-only poses operational issues.

 

Process technical documentation (e.g., process design criteria, mass balance and flowsheets) were updated to reflect the changes incorporated during the FEED phase.

 

17.3Xuxa Process Plant

 

17.3.1Description

 

The Xuxa spodumene concentrator process plant is designed based on a proven DMS circuit and includes the following:

 

·A three-stage conventional crushing and screening circuit

·DMS screening and mica removal via up-flow classification

·Two-stage DMS circuit for the coarse fraction

·Two-stage DMS circuit for the fines fraction with a magnetic separation step

·Two-stage DMS circuit for the ultrafines fraction with a magnetic separation step

·Thickening, filtration (belt filter) and dry stacking of hypofines fraction with the waste

·Tailings from the DMS plant trucked for co-disposal with the waste rock.

21501-REP-PM-001
Page | 336

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Figure 17 1 shows the planned layout for the crushing circuit and DMS plant.

 

 

Figure 17-1: Xuxa Process Plant

 

Ore trucked from the mine will be stacked on ROM piles. A Front-End Loader (FEL) will feed material into the crusher feed bin, and an apron feeder will draw the material into the primary crusher. A magnet will remove any tramp metal as the material passes to the scalping screen. The scalping screen undersize material (<9.5 mm) is taken to the DMS feed bin. The oversize material passes to the secondary cone crusher for size reduction. The secondary cone crusher product is joined by the tertiary cone crusher product and directed to a classification screen. The undersize material (-9.5 mm) joins the scalping screen undersize on the DMS feed bin conveyor. The oversize material is conveyed to the tertiary cone crusher feed bin, which splits the material between the two tertiary cone crushers, for size reduction, before it returns to the classification screen.

 

The crushed ore bin provides an 8-hour live capacity buffer between the crusher and the wet plant for stable operation. An emergency feeder allows for wet plant feed in the case where the bin is not able to supply feed

 

The wet plant will consist principally of a two-stage DMS circuit for coarse fractions, two-stage DMS circuit for fines fraction and a two-stage DMS circuit for the ultrafines fraction.

 

The sinks from the secondary stage coarse DMS and the secondary stage fines DMS (which includes a wet magnetic separation step) will report to the DMS product stockpile for truck loading and transport.

 

The floats from the primary stage coarse DMS cyclone, primary stage fines cyclones and secondary fines cyclone as well as those from the ultrafines cyclone will report to a tailings stockpile.

 

The sinks from the secondary ultrafines DMS will report to the ultrafines product stockpile for blending with coarse/fine spodumene product for sale.

 

A DMS tails thickener and filtration system will be used prior to stockpiling of -0.5 mm hypofines with the waste pile.

 

During FEED, the process mass balance and all technical documentation were updated to reflect the changes in design.

21501-REP-PM-001
Page | 337

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Figure 17-2 is a block flow diagram for the crushing circuit and the DMS plant.

 

 

 

Figure 17-2: Block Flow Diagram for Xuxa Crushing Circuit and DMS Plant

21501-REP-PM-001
Page | 338

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

17.3.2Crushing Facilities

 

The Xuxa crushing circuit is a fixed plant operation and is designed to process a nominal throughput of 1.7 Mtpa. The crushing circuit will include a jaw crusher, scalping screen, secondary cone crusher, classification screen and two tertiary cone crushers. Crushed ore will be stored in a bin with reclaim feeder upstream of the wet-plant feed. The bin is sized for nominal eight hours storage with additional capacity via underflow stockpile and front-end loader reclaim to a hopper and feeder.

 

The primary crusher is designed to be fed via front end loader and can accommodate a nominal feed size up to 960 mm. Primary crushed ore feeds a double deck scalping screen where -9.5 mm material is removed to final crushed ore and +9.5 mm material is conveyed to a secondary crusher. Secondary crushed ore feeds a double deck classification screen where -9.5 mm material is combined with scalping screen undersize and conveyed to the crushed ore feed bin and +9.5 mm material feeds two tertiary crushers. Tertiary crushed material combines with secondary crushed material feeding the classification screen. When the crushing plant is not operating, the DMS plant may be fed via front end loader from stockpiles from an emergency feed bin and feeder.

 

Figure 17-3 and Figure 17-4 show the crushing circuit and DMS plant layouts.

 

 

Figure 17-3: Sigma Crushing and DMS Plant Overview

21501-REP-PM-001
Page | 339

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Figure 17-4: Sigma Primary Crushing Facility and Crushed Ore Bin

 

17.3.3DMS Plant

 

Crushed ore from the crushed ore feed bin will be conveyed to a sizing screen to remove the -1.7 mm material which will be sent to the ultrafines DMS circuit. The -9.5 mm / +1.7 mm material will report to the DMS coarse sizing screen where it will be screened at 4.0 mm to produce:

 

·-9.5 mm / +4.0 mm coarse product which reports to the primary coarse DMS

·-4.0 mm / +1.7 mm fines product which reports to the primary fines DMS via a REFLUX™ classifier

 

The coarse and fine DMS circuits will consist of primary and secondary DMS cyclones to efficiently separate spodumene from the gangue material in order to produce a target 6.0% Li2O or higher concentrate grade. Mica will be removed from the fines stream by a REFLUX™ classifier, prior to feeding the DMS fines preparation screen.

 

Prior to feeding the primary DMS cyclones, each ore stream (coarse and fine) will be mixed with ferrosilicon slurry and pumped to the respective coarse and fine primary DMS cyclones. The ferrosilicon slurry density will be carefully controlled to enable the gravity separation of spodumene from minerals with a lower SG. Spodumene has a higher SG than most other gangue minerals and consequently the spodumene will report to the DMS cyclone underflow (sinks), with the gangue material reporting to DMS cyclone overflow (floats).

21501-REP-PM-001
Page | 340

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

Figure 17-5 shows the plant layout in relation to the planned stockpile areas.

 

 

 

Figure 17-5: Sigma Xuxa DMS Plant and Product Stockpiles

 

17.3.3.1Primary DMS Circuit (Coarse and Fines)

 

The primary DMS circuit will have two sets of DMS cyclones (coarse and fines). They both will share the same target SG cutpoint (2.65) ferrosilicon medium.

 

The floats from the primary coarse DMS cyclones will be sent to tailings, while the underflow streams (sinks) will report to the secondary coarse DMS cyclones.

 

The primary fines DMS circuit feed will be processed through a REFLUX™ classifier, which aims to remove a portion of the mica. This mica stream will be dewatered and report to tailings, while the REFLUX™ classifier underflow will report to the primary fines DMS cyclones. The floats from the primary fines DMS cyclones will be sent to tailings, while the underflow streams (sinks) will report to the secondary fines DMS cyclones.

 

17.3.3.2Secondary DMS Circuit (Coarse and Fines)

 

The secondary DMS circuit will have two sets of DMS cyclones (coarse and fines DMS cyclones). They will both share the same target SG cutpoint (2.90) ferrosilicon medium.

 

The floats from the secondary coarse DMS stage will be re-crushed through a rolls crusher and transferred back to the sizing screen. The floats stream from the secondary fines DMS cyclone will report to a waste pile.

 

The sinks from the secondary coarse DMS cyclones and those from the secondary fines DMS cyclones will be sent to the DMS product stockpile via a magnetic separator for iron removal to meet the product iron content criteria, and via an ore sorter for removal of high SG gangue such as schist which cannot be separated from the spodumene in the DMS circuit. This will be the final spodumene concentrate product at a target grade of 6% Li2O.

21501-REP-PM-001
Page | 341

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

17.3.3.3Ultrafines DMS Circuit

 

The undersize (-1.7mm) material from the DMS sizing screen will be screened further by a subsequent ultrafines DMS preparation screen. The +0.5 mm material will report to the ultrafines DMS circuit and the -0.5 mm material will be pumped to the tails thickener.

 

The ultrafines DMS circuit will consist of primary and secondary DMS cyclones to efficiently separate spodumene from the gangue material. The primary ultrafines cyclones will have a target SG cutpoint (2.60) ferrosilicon medium. The secondary ultrafines cyclones will have a target SG cutpoint (2.85) ferrosilicon medium.

 

The ultrafines DMS circuit feed will be processed through a REFLUX™ classifier, which aims to remove a portion of the mica. This mica stream overflows to the screw classifier, while the REFLUX™ classifier underflow will report to the primary fines DMS cyclones. The floats from the primary ultrafines DMS cyclones will be sent to tailings, while the underflow stream (sinks) will report to the secondary ultrafines DMS cyclone.

 

The sinks from the secondary ultrafines DMS cyclones will be sent to the ultrafines DMS product stockpile via a magnetic separator for iron removal to meet the product iron content criteria. This will be the final spodumene concentrate product at a target grade of 6% Li2O.

 

17.3.4Thickening, Filtration and Hypofines Stacking

 

The ultrafines preparation screen undersize (-0.5 mm), screw classifier overflow and ultrafines tails will report to the tails thickener for dewatering. The underflow will be discharged to a belt filter and the filter cake will report to a stockpile of -0.5 mm hypo fines stockpile.

 

17.3.5Tailings Disposal System

 

The floats from the primary coarse and fines DMS cyclones, the secondary fines cyclone as well as the underflow from the screw classifier (mica and floats) will be stockpiled to be co-disposed with mine waste.

 

17.3.6Basis of Design and Mass Balance

 

Data for the 2019 Feasibility Study was based on the 2019 metallurgical test work data. Recovery data are based on the data from Var 3 and Var 4. Further testing was undertaken in 2021 which increased the confidence levels of the average global recovery of 60.4%. The engineering and design were developed to a feasibility-level based on the mass balance, process design criteria and process flow diagrams which incorporate the results of the laboratory test work. The design was further refined during the FEED phase in 2021 and detailed design in 2022.

 

The operating parameters used as a basis for design are summarized in Table 17-1.

 

Table 17-1 – Xuxa Operating Parameters

 

Parameter Value
Operating days/annum 365
Operating hours/day 24
Calendar hours 8,760
Shifts/day (crushing & sorting) 2
Shifts/day (wet Plant) 3
Hours/shift 8

21501-REP-PM-001
Page | 342

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

The design basis and mass balance based on the test work results are summarized in Table 17-2.

 

Table 17-2: Xuxa Design Basis and Mass Balance Summary

 

Parameter Units Value Source Comment
Nominal ore processing rate dry tonnes per year 1,500,000 1 Client
wet tonnes per year 1,530,612 4 Calculation
Spodumene ore grade (incl. dilution) % Li2O 1.46 1 2019 DFS
Ore moisture % w/w 2 1 Client
Crushing Plant        
Dilute ore stockpile days 2 1 Client
Ore fed to crusher dry tonnes per year 1,500,000 1 Client
wet tonnes per year 1,530,612 4 Calculation
Design ore fed to crusher dry tonnes per year 1,700,000 1 Client
Crusher overall availability % 68.0 1 Client
Crusher operating hours hours per year 5,957 1 Client
Design ore crushing rate dry tonnes per day 6,849 4 Calculation
Design ore crushing rate dry tonnes per hour 285 4 Calculation
wet tonnes per hour 291 4 Calculation
Wet Plant        
DMS plant feed bin hours 8 1 Client
Feed rate to wet plant dry tonnes per year 1,500,000 1 Client
wet tonnes per year 1,530,612 4 Calculation
Design feed rate to wet plant Dry tonnes per year 1,700,000 1 Client
Wet plant overall availability % 85 6 Industry Standard
Wet plant operating hours hour per year 7,446 6 Industry Standard
Wet plant feed rate dry tonnes per day 5,479 4 Calculation
Wet plant feed rate dry tonnes per hour 228 4 Calculation
wet tonnes per hour 233 4 Calculation
Reflux Classifier mica rejection rate %w/w 2.5 3 SGS 2019 Test work

DMS coarse prep screen oversize

(-9.5 mm / +4.0 mm)

%w/w Mass 38.4 3 Benchmarking
DMS coarse prep screen undersize (-4.0 mm / +1.7 mm) %w/w Mass 27.9 3 Benchmarking
Ultrafines DMS sizing screen oversize (-1.7 mm / +0.5 mm) %w/w Mass 19.1 3 Benchmarking
Ultrafines DMS sizing screen undersize (-0.5 mm) (hypofines) %w/w Mass 14.6 3 Benchmarking
Wet plant spodumene concentrate grade %w/w Li2O 6.0 7 Industry Standard

21501-REP-PM-001
Page | 343

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

Parameter Units Value Source Comment
Li2O Recovery        
Li2O recovery (DMS - global) % 60.4 4 Calculated from 6.0% Li2O grade at mass balance throughput
Stockpiles        
Coarse & Fines spodumene dry tonnes per year 190,853 4 Calculation
wet tonnes per year 216,878 4 Calculation
Ultrafines spodumene dry tonnes per year 31,479 4 Calculation
wet tonnes per year 35,771 4 Calculation
Total spodumene concentrate production dry tonnes per year 222,332 4 Calculation
wet tonnes per year 252,650 4 Calculation
Hypofines stockpile dry tonnes per year 309,783 4 Calculation
wet tonnes per year 352,036 4 Calculation
Process tails – tonnage dry tonnes per year 1,330,649 4 Calculation
wet tonnes per year 1,170,058 4 Calculation

 

Operating hours assumptions for the main facilities are provided in Table 17-3.

 

Table 17-3: Xuxa Operating Hours for Main Facilities

 

Facilities Calendar Hours
(h/a)
Operating
Hours (h/a)
Overall utilization
(%)
Crushing and conveying 8,760 5,957 68
Dense medium separation circuit 8,760 7,446 85
Tails filter plant and conveyor 8,760 7,446 85

 

17.3.7Utilities Requirements

 

The power consumption requirements are approximately 6.3 MW for the processing plant.

 

The raw water consumption is a nominal 35 m3/h (with an additional make-up raw water requirement to process water when necessary).

 

The process water will be recycled within the plant with a thickener, where all fines slurry streams will be directed and recovered. This water will be pumped to the process water tank and recycled to the circuits as needed.

 

Consumables will include reagents and operational consumables for the crushing circuit and the DMS plant.

 

Reagents will include ferrosilicon a consumption rate of 530 g/t DMS feed and 960 g/t ultrafines DMS feed. and flocculant (Magnafloc 10 or equivalent) at a consumption rate of 10-40 g/t.

 

In the crushing circuit, consumables will include liners for all the crushers and the screen panels. In the DMS plant, maintenance items will be necessary for cyclones, pumps, screens and belt filters.

21501-REP-PM-001
Page | 344

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

17.4Barreiro Process Plant

 

17.4.1Overview

 

The Barreiro concentrator will be located approximately 7 km from the Barreiro open pit and in proximity to the Xuxa plant. Spodumene concentrate will be produced using dense media separation (DMS). The plant is designed to produce a minimum 6.0% Li2O spodumene concentrate. The run-of-mine ore has a feed grade of 1.39% Li2O (mine plan is based on 3% dilution).

 

The Barreiro plant throughput capacity is 1.85 Mtpa (dry) of ore fed to a dedicated crushing circuit. The Barreiro plant is designed to produce 220,000 tpa of 6% Li2O spodumene concentrate.

 

Figure 17-6 shows the planned layout for the Xuxa and Barreiro crushing and process plants.

 

 

Figure 17-6: Xuxa and Barreiro Process Plant Layout (2021 Design)

 

17.4.2Description

 

The spodumene concentrator process plants are designed based on a proven DMS circuit and includes the following:

 

·Three-stage conventional crushing and screening

·DMS screening and mica removal via up-flow classification

·Two-stage DMS circuit for the coarse fraction, with recrush of middlings stream

·Two-stage DMS circuit for the fines fraction

·Two-stage DMS circuit for the ultrafines fraction

·Thickening, belt filtration and dry stacking of the hypofines fraction with waste rock

·Magnetic separation of the concentrate streams

·DMS plant tailings will be trucked for co-disposal

·DMS product will be stockpiled ready for dispatch.

21501-REP-PM-001
Page | 345

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

Ore trucked from the mine will be stacked on ROM piles. A Front-End Loader (FEL) will feed material into the crusher feed bin, and an apron feeder will draw the material into the primary crusher. A magnet will remove any tramp metal as the material passes to the scalping screen. The scalping screen undersize material (<9.5 mm) is taken to the DMS feed bin. The oversize material passes to the secondary cone crusher for size reduction. The secondary cone crusher product is joined by the tertiary cone crusher product and directed to a classification screen. The undersize material (-9.5 mm) joins the scalping screen undersize on the DMS feed bin conveyor. The oversize material is conveyed to the tertiary cone crusher feed bin, which splits the material between the two tertiary cone crushers, for size reduction, before it returns to the classification screen.

 

The crushed ore bin provides an 8-hour live capacity buffer between the crusher and the wet plant for stable operation. An emergency feeder allows for wet plant feed in the case where the bin is not able to supply feed.

 

The wet plant will consist of a two-stage DMS circuit for coarse fraction (-9.5 mm / +4.0 mm), a two-stage DMS circuit for the fines fraction (-4.0 mm / +1.7 mm) and a two-stage DMS circuit for the ultrafines fraction (-1.7 mm / +0.5 mm). The sinks from the secondary stage coarse and fines DMS circuits (which includes wet magnetic separation) will report to the DMS product stockpile. The sinks from the ultrafines DMS will report to the ultrafines product stockpile, after magnetic separation, for blending with coarse/fine spodumene product for sale.

 

The floats from the secondary stage coarse DMS cyclone will be crushed to improve liberation and returned to the feed preparation screen. The floats from the primary stage coarse DMS cyclone, primary and secondary stage fines cyclones and those from the ultrafines cyclones will report to a tailings pile. The DMS tailings (-0.5 mm hypofines fraction) will be thickened and filtered prior to stockpiling with the waste pile.

21501-REP-PM-001
Page | 346

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

Figure 17-7 is a block flow diagram for the crushing circuit and DMS plant.

 

 

 

Figure 17-7: Block Flow Diagram for the Barreiro Crushing Circuit and DMS Plant

21501-REP-PM-001
Page | 347

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

17.4.3DMS Plant

 

Crushed ore from the feed bin will be transported to the DMS feed inlet where it will be conveyed to a sizing screen to remove the -1.7 mm material which will be sent to the ultrafines DMS circuit. The -9.5 mm / +1.7 mm material will report to the DMS coarse sizing screen where it will be screened at 6.3 mm to produce:

 

·A coarse fraction (-9.5 mm / +4.0 mm) which reports to the primary coarse DMS

·A fines fraction (-4.0 mm / +1.7 mm) which reports to the primary fines DMS via a REFLUX™ classifier

 

The coarse and fine DMS circuits will consist of primary and secondary DMS cyclones to efficiently separate spodumene from the gangue material in order to produce a 6.0% Li2O or higher concentrate grade. Mica will be removed from the fines stream by a REFLUX™ classifier, prior to feeding the DMS fines preparation screen.

 

Prior to feeding the primary DMS cyclones, each ore stream (coarse and fine) will be mixed with ferrosilicon slurry and pumped to the respective coarse and fine primary DMS cyclones. The ferrosilicon slurry density will be carefully controlled to enable the gravity separation of spodumene from minerals with a lower sg. Spodumene has a higher sg than most gangue minerals and consequently the spodumene will report to the DMS cyclone underflow (sinks), with the gangue material reporting to the cyclone overflow (floats).

 

17.4.3.1Primary DMS Circuit (Coarse and Fines)

 

The primary DMS circuit will have two sets of DMS cyclones (coarse and fines). They will both share the same sg (2.65) ferrosilicon medium.

 

The floats from the primary coarse DMS cyclones will be sent to tailings, while the underflow streams (sinks) will report to the secondary coarse DMS cyclones.

 

The primary fines DMS circuit feed will be processed through a REFLUX™ classifier, which aims to remove a portion of the mica. This mica stream will be dewatered and report to tailings, while the REFLUX™ classifier underflow will report to the primary fines DMS cyclones. The floats from the primary fines DMS cyclones will be sent to tailings, while the underflow streams (sinks) will report to the secondary fines DMS cyclones.

 

17.4.3.2Secondary DMS Circuit (Coarse and Fines)

 

The secondary DMS circuit will have two sets of DMS cyclones (coarse and fines DMS cyclones). They will both share the same SG (2.90) ferrosilicon medium.

 

The floats from the secondary coarse DMS stage will be re-crushed through a rolls crusher and transferred back to the sizing screen. The floats stream from the secondary fines DMS cyclone will report to a waste pile.

 

The sinks from the secondary coarse DMS cyclones and those from the secondary fines DMS cyclones will be sent to the DMS product stockpile via a magnetic separator for iron removal to meet the product iron content criteria. This will be the final spodumene concentrate product at 6% Li2O.

 

17.4.3.3Ultrafines DMS Circuit

 

The ultrafines (-1.7 mm / +0.5 mm) from the sizing screen will be dewatered using a hydrocyclone and screened. The -1.7 mm / +0.5 mm material will report to the ultrafines two stage DMS circuit. The floats will report to a waste pile.

 

17.4.4Thickening, Filtration and Hypofines Stacking

 

The ultrafines dewatering cyclone overflow, the ultrafines screens undersize (-0.5 mm), the screw classifier overflow and other screen underflows will report to the DMS tailings thickener for dewatering. The underflow will be discharged to a belt filter and the filter cake will report to the hypofines stockpile which will then report to a waste pile.

21501-REP-PM-001
Page | 348

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

17.4.5Tailings Disposal System

 

The floats from the primary coarse and fines DMS cyclones, the secondary fines DMS cyclone, and the ultrafines DMS cyclone, as well as the underflow from the screw classifier (mica and floats) will be screened to 12% moisture and co-disposed with mine waste in a waste pile.

 

17.4.6Basis of Design and Mass Balance

 

For the current pre-feasibility study, Barreiro design is based on the metallurgical test-work data on four variability samples and a composite sample. Engineering and design were developed to a pre-feasibility level based on the mass balance, process design criteria and process flow diagrams which incorporate the results of the laboratory test work.

 

The operating parameters used as a basis for design are summarized in Table 17-4.

 

Table 17-4: Barreiro Operating Parameters

 

Parameter Value
Operating days/annum 365
Operating hours/day 24
Shifts/day (Crushing & Wet Plant) 3 x 8 h
Overall Availability (Crushing) 68%
Overall Availability (Wet Plant) 85%

 

The design basis and mass balance based on the test work results are summarized in Table 17-5.

 

Table 17-5: Barreiro Design Basis and Mass Balance Summary

 

Parameter Units Barreiro Value
Total ore processing rate dry tonnes per year 1,850,000
wet tonnes per year 1,888,000
Spodumene ore grade (incl. dilution) % Li2O 1.39
Ore moisture % w/w 2
Dilution factor % w/w 3
Crushing Plant    
Crusher overall availability (nominal/design) % 68/54
Crusher operating hours (nominal/design) hours per year 5,962/4,744
Ore crushing rate (design) dry tonnes per hour 390
Nominal ore crushing rate dry tonnes per hour 3292
wet tonnes per hour 298
Wet Plant    
DMS plant feed bin hours 8
Feed rate to wet plant dry tonnes per year 1,850,000
wet tonnes per year 1,888,000

21501-REP-PM-001
Page | 349

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

Parameter Units Barreiro Value
Wet plant overall availability % 85
Wet plant operating hours hour per year 7,446
Nominal wet plant feed rate

dry tonnes per day

(24 h/d)

5069
Nominal wet plant feed rate dry tonnes per hour 248
wet tonnes per hour 254
Reflux Classifier mica rejection rate %w/w Reflux feed 5

DMS coarse prep screen oversize

(-9.5 mm / +4.0 mm)

%w/w 31.5
DMS coarse prep screen undersize (-4.0 mm / +1.7 mm) %w/w 31.5

DMS sizing screen undersize

(-1.7 mm / +0.5 mm)

%w/w 21.0
Ultrafines dewatering cyclone undersize (-0.5 mm hypofines) %w/w 16.0
Wet plant spodumene concentrate grade %w/w Li2O 6.0
Li2O DMS Stage Recovery   59.1
Li2O global recovery (Combined) % 50.9
Li2O global recovery – Coarse DMS % 18.8
Li2O global recovery – Fines DMS % 19.6
Li2O global recovery – Ultrafines DMS % 12.6
Stockpiles    
Coarse & Fines spodumene dry tonnes per year 165,600
wet tonnes per year 170,000
Ultrafines spodumene dry tonnes per year 54,400
wet tonnes per year 57,100
Total spodumene concentrate production dry tonnes per year 220,000
wet tonnes per year 226,900
Hypofines Production dry tonnes per year 296,000
wet tonnes per year 340,400
Process Tailings Production dry tonnes per year 1,630,000
wet tonnes per year 1,880,040

 

17.4.7Utilities Requirements

 

The power consumption requirements for the Barreiro plant is approximately 6.3 MW.

 

The raw water consumption for process water is a nominal 35 m3/h (make-up raw water requirement). The process water will be recycled within the plant using a thickener, where all fines slurry streams will be directed and recovered. This water will be pumped to the process water tank and recycled to the circuits as needed.

21501-REP-PM-001
Page | 350

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

Consumables will include reagents and operational consumables for the crushing circuit and the DMS plant. Reagents will include ferrosilicon and flocculant.

 

·Ferrosilicon: a consumption rate of 530 g/t or 312 tpa

·Flocculant: has a maximum consumption rate of 60 g/t or 23 tpa

 

In the crushing circuit, consumables will include liners for all the crushers and the screen panels. The primary jaw crusher liner change outs are estimated to be an average of 9.2 sets per year and 18.5 sets per year for the secondary and tertiary cone crushers liners. The change out frequency of the crushing circuit and DMS screen panels is based on 3 sets per year per screen. Other consumable items for the DMS plant include wear parts for cyclones, pumps, and belt filters.

21501-REP-PM-001
Page | 351

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

18Project Infrastructure

 

The mine and the concentrator infrastructure will be located at Sigma’s Xuxa property. Much of the mining non-process infrastructure at the mine services area will be included in the contract mining scope. The main infrastructure will include:

 

·Two open pit mines and four waste stockpiles

·Raw water supply (underground pipeline) from Jequitinhonha River to the site (utility plant)

·Electrical supply infrastructure to provide power to the site and related substations

·Federal access road BR367

·Deviation from BR367, by a municipal road, to the process plant

·Bridge over the Piauí River spanning Pit 1 and Pit 2

·Road transport (including haul roads) for waste rock and ore to and from the mine

·Workshops and fueling services

·Plant and mine facilities

 

18.1Xuxa General Site Plan

 

The overall site plan shows the mine pits, process plant, waste rock disposal areas, mining services as well the main access road and the rerouted municipal roads (Figure 18-1). There is an existing operation base west of highway BR367. The Phase 1 plant site, which is approximately 4 km from the main highway, is accessible via an existing municipal road from highway BR367. This road will be widened to a width of 8 m. The existing municipal road located between the process plant and the Xuxa mine workings, will be closed to public traffic. A new road will be built by the municipal authorities to bypass the plant and allow access to local communities. It will be built within the boundaries of the property and be suitable for light vehicle traffic.

 

 

Figure 18-1– Sigma Lithium Project General Layout Plan for Xuxa

21501-REP-PM-001
Page | 352

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

The planned locations for the processing plant and related infrastructure including the ROM pad are shown on Figure 18-2.

 

 

Figure 18-2– Overall Site Plan

 

Note: Grid squares are 500 m x 500 m.

21501-REP-PM-001
Page | 353

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

18.2Roads

 

The existing municipal road needs to be upgraded to be suitable for the trucks traveling to the port for product export. The road will be 11 m in width, with an active road surface of 8 m (Figure 18-3).

 

A 2.6 km long municipal road will be built to bypass the plant and allow access to local communities. It will be built within the boundaries of the property and be suitable for light vehicle traffic. The road will be 8.0 m in width, with an active road surface of 7.0 m.

 

Figure 18-4 shows the layout of the municipal road from the highway exit to the site entrance (Access 1) and the new bypass for community access (Access 2).

 

 

 

Figure 18-3: Schematic of the proposed municipal road upgrades

 

 

 

Figure 18-4: Proposed municipal access road and community bypass road

21501-REP-PM-001
Page | 354

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

18.2.1Haul Roads and Bridge

 

Haul roads and associated drainage for pits and waste piles and to the ROM pad will be built. Gravel roads will be constructed in support of mining operations. Haul roads are planned to be 25 m wide inside the pits and 29 m wide outside the pit.

 

A bridge is planned to cross over the Piaui River for access between the North Pit and the South Pit. The concrete bridge will have a span of 30.0 m and 8.0 m of free lane being designed for Scania G440 trucks or similar.

 

The planned bridge location is shown in Figure 18-5.

 

 

 

Figure 18-5 – Proposed Bridge Location Xuxa Mine

 

For the road drainage system, concrete ditches are provided on the sides of the right-of way and rip-rap rock structures for energy dissipation and discharge.

 

18.3Earthworks and Buried Services

 

Xuxa’s Lithium Process Plant construction includes earthworks on different elevations, necessitating both cut and fill operations. The Project is divided into three major areas: Process Plant; Mine Support Area and Access to the Process Plant.

 

In addition to the studies of geometry and elevation of the levels, geotechnical analyzes were carried out to verify the angles of slope stability. As a result, slopes equal to 1:1 (H:V) for cuts and 1.5:1 (H:V) for embankments were determined. The total earth movement is around 600,000 m³, of which 400,000 m³ consists of cutting and 200,000 m³ of landfill.

 

Appropriate water drainage was designed into the system to minimize slope erosion and the slopes will be hydroseeded to provide additional erosion control.

21501-REP-PM-001
Page | 355

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

18.4WATER BALANCE (STORM WATER, WATER TREATMENT) XUXA

 

18.4.1Hydrology and Hydrogeology

 

18.4.1.1Hydrology

 

For the process plant and mine areas, hydrological studies were completed with the objective of establishing the flow rates for surface drainage control structure and waste pile designs. Hydrological studies assumed 100- and 500-year return periods, with a 50% probability of occurrence. A minimum permissible velocity of 0.5 m/s was assumed, to avoid deposition of solids in the channels. Soil type and characteristics of land use were identified via satellite imagery and a technical site visit. Topographic information was provided by Sigma.

 

At the mine area, after each precipitation event, monitoring of river sections downstream of the ponds for erosive processes should be carried out.

 

18.4.1.2Piauí River Flood Study

 

The flood line indicates that the flood areas along the Piauí River, in the planned bridge area, are basically contained in the greater waterway channel. Flood modelling in the area of the planned bridge was conducted using a 100-year return period.

 

18.4.1.3Hydrogeology

 

A detailed hydrogeological investigation was conducted over a 12-month period. The investigation determined the baseline study of the pre-mining conditions, including the following:

 

·Review of historical data, which included the 3D geologic model from mineral exploration drilling, strike and dip direction of open fracture sets in cores and cross sections at the study site and water quality data for surface water/ groundwater/ springs

·Identification of potential contaminant sources

·Determination of physical and geochemical parameters to be monitored as part of baseline and regular monitoring program

·Installation of six baseline monitoring wells plus an additional well for a pumping test

·Conduct pumping tests to estimate key hydrogeological parameters of the subsurface in the mine pit area and to evaluate dewatering options: a pumping well (larger diameter than monitoring wells) will be drilled as well as two monitoring wells for drawdown monitoring (these two are included in the total of six baseline monitoring wells)

·Estimation of hydraulic conductivities for monitoring wells using slug tests

·Determine local and regional groundwater flow directions and local gradients

·Collected groundwater samples for select parameters to set up baseline groundwater chemistry from monitoring wells

·Developed a hydrogeological model for the site.

 

The metasedimentary schist host rock has low primary permeability/porosity.

 

A hydrogeological monitoring program will be employed during the mining operation and will likely include:

 

·Installation of a monitoring well network based on baseline study results, geologic setting and potential sources of contaminants (inorganic and organic)

·Regular groundwater sampling for select parameters and record of water levels; and measure field parameters (electrical conductivity, pH and temperature) for each monitoring well

·Sample analysis and comparison of the results with Brazilian environmental guidelines

·Environmental report preparation.

21501-REP-PM-001
Page | 356

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

18.4.2Overview

 

To avoid damage to the access and interior roads, a surface drainage system will be implemented. Contact water from the process plant, non-process plant and mine services, tailings and waste piles, the open pit area and the access road will be sent to the sedimentation ponds. All drainage from plant, mine services area and waste rock / tailings disposal piles will be collected in settling pond #1. Drainage of the waste rock pile in the Gilson area will be collected in settling pond #2. For waste piles 2 and 3, the graded surface will be sloped to allow for rainwater to be discharged by gravity out of the waste piles, where it will be picked up by gutters and/or other drainage devices to settling ponds 3 or 4.

 

Process plant water will be taken from the Jequitinhonha River at a maximum rate of 150 m3/h (refer to discussion in Section 18.11), and the plant will also use water recycled from the sedimentation ponds. Recycling will be maximized to reduce intake water consumption and to allow for water collection at various stages of the process for reuse. Water recovery will also lower intake water consumption by recycling drainage water collected in the sedimentation ponds. Figure 18-6 is a balance projection for operations. Some of the recycled water will also be used for dust suppression.

 

 

 

Figure 18-6 – Xuxa Mine Water Balance

 

18.4.3Open Pit Dewatering

 

In the open pits, the drainage will be directed to the benches at the deepest levels that will be developed to receive all the pit drainage. Deeper benches will serve as sumps and solids containment basins. Each pit will have its own sedimentation pond. Water from these ponds will be used to fill water trucks in the dry season and may also be pumped to the sediment ponds in the waste pile area.

 

When necessary, a diesel portable dewatering pump mounted on skids will be used to pump the water in the waste pile sediment ponds.

21501-REP-PM-001
Page | 357

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

18.4.4Tailings and Waste Piles

 

18.4.4.1Tailings Pile and Waste Piles 1

 

Runoff will be directed from higher ground around the tailings and waste piles.

 

For the waste piles where tailings and waste will be co-disposed, precipitation falling directly on the waste piles will be managed in order to maintain a dry working area to place the tailings, to mitigate erosion of the tailings, and manage turbidity in runoff prior to water recycling to the process plant.

 

Tailings placement will be restricted during and immediately after precipitation events and surface accumulations of water will be allowed to runoff and evaporate. Surface runoff will be facilitated by sloping the pile surface to essentially match the underlying topography, with an overall slope of 2–3% towards the southeast.

 

Runoff water will be collected in an engineered saucer-shaped low from where it will be gravity drained through a pipe in the perimeter lane and discharged to a sedimentation pond located adjacent to the southeast corner of the pile. Once construction of the pile is completed, a final protective cover will be placed to facilitate revegetation and minimize erosion, at which point the sedimentation pond may be decommissioned.

 

For the waste piles which will receive waste rock only, ponds will be built to receive all pile drainage and eventually drainage from the pits. Drainage in the ramps of the waste piles will be built to direct water bench to bench and peripheral trenches will be built to direct rainfall water to the ponds ensuring solids containment if solids are carried from the waste piles to the containment basins. These ponds will be cleaned during dry seasons. Accumulated water will be used to fill the water trucks or may be discharged if the water is within the applicable aquatic guidelines.

 

18.4.4.2Waste Piles 2 and 3

 

The graded surface will be sloped to allow for rainwater to be discharged by gravity out of the pile, where it will be picked up by drainage channels and/or other drainage devices to settling ponds 3 and 4.

 

18.4.5Water Treatment Plant

 

The Water Treatment Plant for the Jequitinhonha’s River water treatment has treatment capacity of 150 m³/h, providing 20 m³/h of drinkable water as determined by Decree 2914/2011 of the Health Ministry. The water treatment plant is modular and allows the expansion of treatment capacity according to customer demand. The plant includes a physical-chemical water treatment, chemical dosing system and disinfection for drinkable water. The water treatment plant will remove sand, suspended solids, and sludge.

 

Treated water will be sent for storage in a primary 3,500 m3 capacity storage tank. The water intakes and proposed treatments are summarized in Figure 18-7.

21501-REP-PM-001
Page | 358

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

 

Figure 18-7 – Intake Water / Water Treatment

 

18.5Sewage

 

There will be a sewage treatment station located in the plant area and one in the mine service area. These will treat all sewage collected from the buildings in mine service area and at the plant non-process infrastructure. In the mine pit areas, portable toilets will be used.

 

The sewage system is designed to treat all domestic effluent from the process plant and utilities areas (12 m3/day, equivalent to 100 persons) and the mine services area (42 m3/day equivalent to 350 persons).

 

The sewage treatment plants are modular and consist of a preliminary treatment, a secondary treatment, in addition to a tertiary treatment for disinfection. The treated wastewater from the sewage treatment will need to be disinfected to be able to be sent to a drainage system (compliance to CONSEMA 128 and CONAMA 430). The sludge coming from sewage treatment plant will be trucked off site for disposal by specialized contractors.

 

18.6Built Infrastructure

 

The main processing facilities will consist of unclad steel structures for access, maintenance and equipment support. Floor layouts for access and maintenance around the equipment will generally be open grating; where required, checker-plate or elevated concrete slabs will be used. Switch-rooms (housing the various motor control centres (MCCs)) will be prefabricated and pre-wired, with the wiring tested in the factory before despatch, to minimise site work.

 

The steel structures will be built on foundations supported directly under the soil, through floors, and reinforced concrete footings according to the needs of each structure.

 

18.6.1Non-Process Infrastructure

 

All buildings in the administrative areas will be built as modular structures, with painted metal panels, thermal insulation, and metal tiles. The buildings will be provided with all electrical, hydraulic and communication facilities. Containers will be used for laboratories and electrical substations (switch-rooms).

 

Operational support facilities, such as the compressor room and others, will be of conventional construction consisting of metal structure sheds and masonry offices, except workshops and warehouses, which will consist of metal structure sheds with vinyl canvas coverings.

21501-REP-PM-001
Page | 359

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Utilities such as raw water, potable water and fire water will be provided for these buildings. A fire detection and protection system consisting of firewater hydrants and portable fire extinguishers will be installed.

 

Table 18-1 summarizes the planned built non-process infrastructure requirements.

 

Table 18-1 – Infrastructure Summary Table

 

Item Comment
PROCESS PLANT  
Administrative building and change room 380 m²; separate areas for male/female; prefabricated modular construction
Gate house 110 m²; prefabricated modular construction
Kitchen and canteen 350 m²; canteen and Kitchen; prefabricated modular construction
Plant workshop and warehouse

The workshop building will be 630 m². The warehouse will have 320 m² of covered area and 300 m² of open area.

metal structure building with vinyl canvas closure.

Laboratories 445 m²; metal shed. Will have containers for the physical laboratory (13.4 m), chemical laboratory (13.4 m) and an office (6.7 m).

21501-REP-PM-001
Page | 360

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Item Comment
First aid clinic, fire station.

110 m²; first aid clinic; prefabricated modular construction
Covered parking for the ambulance and fire truck.

Truck weigh station

Will consist of a road scale located in the plant area, and will weigh the spodumene concentrate product trucks leaving the plant and weigh diesel tank trucks that will supply diesel storage facilities in the mine area
Trucks will be weighed when they enter and exit the plant. It is estimated that 35 spodumene product trucks will be weighed per day and 3–4 diesel trucks per week. The scale will be sized for B-Double-sized trucks

21501-REP-PM-001
Page | 361

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Item Comment
Truck scale control room and truck driver rest area 35 m²; prefabricated modular construction and located near the truck scale.
Compressor Room  55 m² Single conventional metal structure building
Waste management 110 m2; prefabricated modular construction

 

18.6.2Mining Infrastructure

 

The contract mining contractor will provide their own design and install the facilities for the mining services area, except for the diesel storage and dispensing facilities.

 

A conceptual mining services area layout was generated for estimation purposes; however, this layout will be fully designed by the selected mining contractor.

 

Table 18-2 summarizes the planned built non-process infrastructure requirements and Figure 18-8 shows a conceptual representation of the workshop areas.

 

Table 18-2 – Infrastructure Summary Table

 

Item Comment
MINE  
Mine workshop

Maintenance will be carried out by the mining contractor. The team will be assisted on a technical basis by the original equipment manufacturer (OEM).

Stores facility for items such as hydraulic hoses, filters, hydraulic components, drifters.

The workshop area will be equipped with an overhead crane, storage area for area for empty and full gas bottles, offices, mess room, change room, storage facilities.

21501-REP-PM-001
Page | 362

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Item Comment
Heavy vehicle workshop

Trackless workshop. Will be equipped with 2 service bays and two ramps for all daily, weekly and monthly maintenance. Includes a bay for tracked equipment.

Will be equipped with fire hydrant points and chemical extinguishers, grinding equipment and vehicle repair tools, store area, workbenches, lockers, tools and tool crib

Boiler shop Will handle minor emergency rebuilds for equipment, piping repairs, general steelwork maintenance, box-front exchange and stores holding

21501-REP-PM-001
Page | 363

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Item Comment
Electromechanical workshop

Will include the machining and subassembly (mechanical) workshop and the electrical and instrumentation workshop. The mechanical workshop will handle service exchange, sub-assembly services, refurbishment of components and small stores holding. It will be equipped with hydraulic bench press, workbenches, grinding equipment, drilling machine, lathe machines, bandsaw and tools as required.

The electrical and instrumentation workshop facility will handle service exchange of motors, sub-assembly services, refurbishment of components and testing. It will be equipped with electrical test bench for equipment, electrical motor testing equipment, motor vehicle testing equipment, electrical cable store and small tools as required

Tire shop Store and replace tires.

21501-REP-PM-001
Page | 364

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Item Comment
Truck wash Designed to cater for washing of trackless machines.  Wash bay will be equipped with a high-pressure water cleaner, a silt trap to separate the grit and an oily wastewater treatment station.  Facility will include chemical extinguishers, high pressure water cleaning equipment, oil separator and small tools
Magazines and emulsion plant

Explosives, detonators and emulsion will be trucked to site under a contract supply arrangement. Facilities will be located close to the North Pit.

Distances from the magazines and the emulsion plant will be in accordance with the Brazilian regulation for the storage of explosives (R105 Brazilian Army code).

The emulsion will be stored in a vertical silo.

21501-REP-PM-001
Page | 365

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

(graphic)

 

Figure 18-8: Conceptual Representation of Workshop Areas

 

18.7Stockpiles

 

18.7.1ROM Stockpile

 

The ROM pad area will be located at the feed of the primary crushing circuit and will be built up of first category fill material compacted to 95%. The ROM will be delivered in 40-t trucks directly from the mine. The truck will dump the material at the handling area which will then be piled using a front-end loader. The ROM stockpile will occupy an area of about 20,000 m2 of the ROM pad and have an approximate base of 200 m x 100 m and a maximum height of 10 m for a capacity of 5,000 t or 1 day’s plant feed. Approximately 15,000 m2 of the ROM pad area will be used for ROM handling with trucks and front-end loaders. A front-end loader will feed the primary crusher.

 

Excavated channels will be used for rainwater drainage of the ROM pad area which connect to the overall plant rainwater drainage collection system.

 

18.7.2Crushed Ore Feed Bin

 

Crushed ore will be sent to the DMS feed bin which will have a capacity of 8 hours and includes an emergency overflow chute. The crushed ore will be automatically fed from the feed bin to the DMS circuit. The DMS circuit will also have a secondary feed chute which can be fed by a front-end loader during extended maintenance periods of the crushing plant.

 

18.7.3Spodumene Concentrate Stockpile

 

The concentrate stockpile will be fed by a radial stacker and sized for one day for a storage of 720 t. The stockpile will have a concrete pad and the concentrate will be loaded into product transport trucks with front end loaders for transport to the port.

21501-REP-PM-001
Page | 366

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

18.7.4Hypofines Stockpile (In-Plant)

 

The hypofines stockpile will be fed by a radial stacker and be sized for one day’s storage of 890 t. There will be no concrete pad beneath the stockpile. Hypofines will be loaded into mine trucks by front end loaders and transported to a waste pile.

 

18.7.5Ultrafines Stockpile (In-Plant)

 

Ultrafines spodumene concentrate product will be stockpiled by a radial stacker and be sized for one day’s storage of 105 t. It will have a concrete pad.

 

18.7.6Waste Storage – Dry Stack Tailings Stockpile (In-Plant)

 

The tailings stockpile will be fed by a radial stacker, placed on grade and sized for a storage capacity of 3,600 t. There will be no concrete pad beneath the stockpile. The tailings will be loaded into mine trucks by front end loaders and transported to a waste pile.

 

18.8Waste Disposal

 

18.8.1Xuxa Waste Disposal

 

The waste rock disposal areas are located close to the Xuxa pits. The sites will be properly prepared to include drainage of each waste pile base, and the construction of channels to direct the groundwater flow, aiding the geotechnical stability and mitigating erosion of the stored material. Figure 18-9 shows the location of waste piles and sumps.

 

The geotechnical investigation of the waste pile locations was carried out based on sampling campaigns, laboratory tests and field visits. Altered and unaltered samples were collected to carry out laboratory tests for each of the waste piles. Other available information has been updated, such as laboratory tests, probes with SPT tests and rotary diamond drill hole logs. Figure 18-10 shows the location of the field investigations and test pits.

21501-REP-PM-001
Page | 367

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

(graphic)

 

Figure 18-9: Xuxa Waste Piles Location Map

21501-REP-PM-001
Page | 368

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

  

(graphic) 

 

Figure 18-10: Xuxa Waste Piles Geotechnical Sampling Locations

 

The waste piles will be built using the ascending method, which allows a construction sequence of multiple lifts, beginning with the construction of the base of the pile. Waste will be dumped by trucks and be uniformly distributed and leveled using a bulldozer. The procedure is then repeated, stacking another bench above the original, while maintaining a ramp so that trucks can access the area.

 

Upon completion of a bench, it will be ready to be revegetated by hydroseeding or another method.

21501-REP-PM-001
Page | 369

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Figure 18-11 shows an example of the construction sequence for a berm.

 

(graphic) 

 

Figure 18-11: Constructive Sequencing of the 340 M Level of the Waste Pile Berm

 

Stability analysis cross-sections were selected passing through the highest points of the waste piles assuming the hypothesis of circular rupture for granular material. The Slide program was used with the Simplified Bishop method, adopting as resistance parameters those usually used in rockfill piles. For the foundation, the average strength parameters of the CIU triaxial tests were adopted, as shown in Table 18-3.

21501-REP-PM-001
Page | 370

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 18-3: Xuxa Waste Pile Parameters for Stability Analysis

 

Waste Pile
Number
Materials

γ 

(kN/m3) 

Cohesion
C’

(kPa)

Friction
Angle Φ
(°)
Waste Pile 1 Embankment (waste) 19 1 40
Foundation 1 (schist/saprolite) 16.4 7.1 28.5
Foundation 2 (biotite schist) 21 50 34
Waste Pile 2 Embankment (waste) 19 1 40
Foundation 1 (schist/saprolite) 16.9 9.6 26.9
Foundation 2 (biotite schist) 21 50 34
Waste Pile 3 Embankment (waste) 19 1 40
Foundation 1 (schist/saprolite) 17.7 3.4 32
Foundation 2 (schist) 21 50 34

 

Results of the stability analysis are presented in Table 18-4 and shown in Figure 18-12.

 

The results indicate that the safety factor is greater than 1.5 without a low water table level and 1.3 with a high-water table level. These safety factors are in accordance with those usually adopted for similar structures.

 

Table 18-4: Safety Factor from Xuxa Waste Pile Stability Analysis

 

Waste Pile Number Section Safaty Factor
(minimum)
Waste Pile 1 AA 1.58
BB 1.56
Waste Pile 2 AA 1.58
BB 1.56
Waste Pile 3 AA 1.64
BB 1.63
CC 1.64

21501-REP-PM-001
Page | 371

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

(graphic) 

 

Figure 18-12: Stability Analysis Section AA for Xuxa Waste Pile 03

 

Instrumentation sections designed with water level indicators must be installed after the construction of the landfill in order to monitor any rock deformations and verify the efficiency of the internal drainage system.

 

GE21 recommends bi-weekly visual inspections in the dry months, and an increase in the frequency of inspections during the rainy season, especially for drainage channels and water level indicators.

 

Table 18-5 presents the design parameters of the waste dumps. Table 18-6 shows the capacities of surface areas for the waste dumps designed for the project. The total capacity of the waste dumps was estimated using 25% expansion and 10% compaction factors.

 

Table 18-5: Xuxa Waste Pile Design Parameters

 

Parameter Value
Bench Height 20 m
Minimal Berm Width 10 m
Face Angle 38º
Access Ramp Width 12 m
Ramp Inclination Angle 10%

21501-REP-PM-001
Page | 372

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 18-6: Xuxa Waste Pile Capacities and Surfaces Areas

 

Designed Pile

Volume 

(Mm³) 

Area

(ha) 

Pile 1 14.9 34.0
Pile 2 43.3 74.3
Pile 3 35.9 55.8
TOTAL 94.1 164.1

 

18.8.2Barreiro Waste Disposal

 

The Barreiro waste rock disposal area is planned to be located close to the Barreiro pit, although the final location will depend on the results of environmental analysis and licensing. The site will be properly prepared to include drainage of the waste pile base, and construction of channels to direct the groundwater flow, aiding the geotechnical stability and mitigating erosion of the stored material. Figure 18-13 shows the proposed location of waste pile location.

 

(graphic)

 

Figure 18-13: Proposed Location of Barreiro Waste Dump 

21501-REP-PM-001
Page | 373

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

The waste rock dump will be built using the ascending method, which allows a construction sequence of multiple lifts, beginning with the construction of the base of the pile. Waste will be dumped by trucks and be uniformly distributed and leveled using a bulldozer. The procedure is then repeated, stacking another bench above the original, while maintaining a ramp so that trucks can access the area.

 

Upon completion of a bench, it will be ready to be revegetated by hydroseeding or another method.

 

Figure 18-10 shows an example of the construction sequence for a berm.

 

Instrumentation sections designed with water level indicators will be installed after the construction of the landfill in order to monitor any rock deformations and verify the efficiency of the internal drainage system.

 

GE21 recommends bi-weekly visual inspections in the dry months, and an increase in the frequency of inspections during the rainy season, especially for drainage channels and water level indicators.

 

Table 18-7 presents the design parameters of the Barreiro waste dump. Table 18-8 shows the capacity of surface area for the waste dump designed for the project. The total capacity of the waste dump was estimated using 30% expansion and 15% compaction factors. This final waste dump layout is designed to allow for the expansion of the waste pile. Figure 18-14 shows the mine layout with pits, process plant and waste piles locations.

 

Table 18-7: Barreiro Waste Pile Design Parameters

 

Parameter Value
Bench Height 20 m
Minimal Berm Width 10 m
Face Angle 38º
Access Ramp Width 12 m
Ramp Inclination Angle 10%

 

Table 18-8: Barreiro Waste Pile Capacity and Surface Area

 

Waste Pile Value
Volume (Mm3) 110.9
Area (ha) 122.7
Maximum height (m) 220

21501-REP-PM-001
Page | 374

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

(graphic)

 

Figure 18-14: Final Mine Configuration Showing Xuxa and Barreiro Pits and Sigma Processing Plant

21501-REP-PM-001
Page | 375

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

18.9Fuel

 

Fuel will be trucked to site under a contract supply arrangement. The diesel storage facility will be located on the same terrace as the maintenance workshops and will store diesel fuel for distribution to mine site heavy and light mobile equipment as well as for the plant mobile equipment and vehicles. The facility is designed for ease of access and supply and distribution of diesel fuel. The capacity of the storage facility will be sufficient to supply the site for five days with three aboveground tanks with a total storage of 165 m³. The storage tanks will be located in a concrete containment bunded area.

 

18.10Power Supply

 

18.10.1Site Power Supply

 

Power will be supplied by a CEMIG, a state power company. The CEMIG network offers a stable power supply in accordance with local interconnection rules and ONS (National System Operator) procedures.

 

The power will be supplied from an existing 138 kV overhead transmission line. This line will supply a new CEMIG substation (intersection substation), which will supply the main Sigma substation that will be located adjacent to the CEMIG substation.

 

The incoming power will be reduced to 13.8 kV by a 138-13.8 kV transformer that connects to the medium voltage switchgear for primary distribution. From this point on it will connect to stepdown 13.8-0.44 kV transformers, as below:

 

·Two transformers for DMS

·One transformer for crushing

·Two transformers for utilities

·One transformer for mine

 

The secondary distribution voltage is 440 Vac from above transformers for all loads. For small loads and lighting power, the voltages are:

 

·220V AC 3 phase, 60 Hz for road lighting and small loads

·127V AC 1 phase, 60 Hz for offices and working stations

·Emergency power will be supplied by diesel generator sets.

·The existing 13.8 kV Taquaral Seco Transmission Line located in the Olimpio area (plant area) will be relocated by CEMIG around the site perimeter to an existing line pole.

 

18.10.2Process Plant

 

The crushing equipment is fed by a cable from the plant substation switchgear to a 13.8/0.44 kV transformer. The transformer is connected to a switchroom (440 V) MCC for distribution to the crushing equipment. The contract crushing load is estimated at 1.1 MW, including auxiliary electrical loads (Table 18 9).

 

The DMS equipment is fed by two circuits from the plant substation switchgear to two 13.8/0.44 kV transformers. The transformers are connected to a switchroom (440 V) MCCs for distribution to the DMS equipment.

21501-REP-PM-001
Page | 376

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 18-9 – Total Process Plant Power Demand 

 

(graphic) 

21501-REP-PM-001
Page | 377

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

18.11Water Supply

 

The primary water source will be from the Jequitinhonha River.

 

Sigma has been granted a flow of 150 m3/h for all months of the year by the Agencia Nacional das Águas (ANA) for a period of 10 years. The water will be taken from the Jequitinhonha River by two floating pumps, one operating and one on standby, to the water treatment plant and for the filling station of the trucks that wet the floor of the mine when necessary.

 

Two pumps, one operating and one on standby, will supply treated raw water from the water treatment plant to a day storage tank of 3,500 m3. The distribution of treated raw water from the process water tank to consumption points will be performed by two raw water distribution pumps (one operating and one on standby). The consumers are listed below:

 

·Process Plant (Area 200 and 300)

·Mine services (Area 700)

·Service stations (Area 600)

·Technical fire reserve

 

Potable water will be supplied directly from the water treatment plant. The potabilization unit will supply 20 m³/h of potable water to a potable water storage tank of 75 m³. Two pumps, one operating and one on standby, will supply potable water to the following consumers:

 

·Process Plant (Area 300)

·Shower and eye washes (Area 600)

 

For the auxiliary buildings (bathroom, canteen, etc.) the distribution of potable water will be by gravity flow from the potable water tanks.

 

18.12Compressed Air

 

The compressed air system is responsible for supplying service air and instrument air to process plant (Area 300, Area 200) and to utilities area (Area 600). Compressed air is supplied by two compressors, one operating and one on standby. The air compressed system has a nominal capacity of 700 Nm3 /hr, and it is composed by air dryers and lung vessels. The lung vessels have the function of storing dry air and absorbing variations in air consumption and acting as an accumulator, serving to guarantee a maximum operating time in the event of a system or plant stop.

 

The compressed air distribution network is split into two branches, one for the delivery of instrument air and the other for service air. However, the instrument air will go to a drying step before being sent for consumption.

 

For the mine and at the mine workshop, compressors will be provided as required by the mining contractor.

 

18.13Control Systems

 

The Programmable Logic Controller (PLC) is an industrial automation device that makes use of programmable memory to store instructions previously defined by the user.

 

For Sigma’s industrial plant, a Process Control System (PCS) is being considered. It contains three main PLCs, where they will monitor all equipment and instruments in the plant and control all equipment not associated with a supplier’s programmable logic controller (PLC). There will be two control rooms within the process plant: the crushing control room and the main control room. The crushing control room will be located next to the crushing switch room, while the main control room will be located next to the DMS switch room.

21501-REP-PM-001
Page | 378

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Within the main control room will be a SCADA server. The SCADA is the main plant’s supervisory control and data acquisition system hardware. It will consist of a pair of redundant master-follower servers of rack-mounted computers. All computers will remotely control equipment, panel, mains power supply from a source of failure, remote control equipment, panel, remote control equipment, panel, and power supply system in case of failure.

 

The control room will house the operating and engineering stations (where the operators are located) and the entire closed-circuit television (CCTV) monitoring system. From the Control Room there is a fibre optic ring connection with the two control rooms of the plant: Crushing Switch Room and DMS Switch Room. The fibre optic network will connect to locations outside the switch room/control room buildings.

 

The remote panels are located in the field and are responsible for transmitting information from the instruments and sending it to the PLC of each area.

 

18.14Communication Systems

 

The communications system will consist of:

 

·Telecommunications network and internet services

·Access control

·CCTV

·All IT infrastructure will be the same for these systems, fibre optics will connect the areas and there will be a central rack that will accommodate equipment like NVR, telecom server, DIO, switches and patch panel. Each area will have network outlet and/or access point.

·Security cameras will be installed at the main gate, warehouse and parking lot.

 

18.15Camps and Accommodation

 

There will be no construction or operations camp for the Project considering the proximity of nearby towns.

 

18.16Port Facilities

 

Sigma will use the port facilities located at Port of Ilhéus for solid bulk storage port operations. The Port of Ilhéus is certified by Bureau Veritas Quality and is fully functional with trained professionals and cargo handling equipment.

 

The port has a maximum draft of 9.3 m, with no restriction on the beam of the vessels and a maximum deadweight tonnage (DWT) of 71,000 metric tonnes. Sigma will be using Ultramax-type Dry Bulk Carriers, carrying approximately 38,000 t of concentrate.

 

The product will be received and unloaded, stored in a segregated and dedicated warehouse or yard that will be free of contamination, and when required, will be uploaded to a ship.

 

The Port of Ilhéus will manage reporting of reception and loading, command of the ship and/or its agents, co-ordinate cargo loading and include port operation insurance.

 

A proposal was submitted to Sigma by Intermarítima Portos e Logística S/A for an average ship loading rate of 5,000 tpd with a tolerance of 10%. Figure 18-15 shows the inland land transport routing from the Xuxa site to the Port of Ilhéus.

21501-REP-PM-001
Page | 379

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 (graphic)

 

Figure 18-15 – Product Transport Routing from Xuxa to Ilhéus

21501-REP-PM-001
Page | 380

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

19MARKET STUDIES AND CONTRACTS

 

Information in this section regarding lithium demand, supply and price forecasts are summarized from Benchmark Mineral Intelligence (2022).

 

19.1Lithium Demand Forecast

 

Lithium’s demand growth profile increased dramatically in 2021, driven by structural changes in the automotive industry with manufactures increasingly transitioning towards electric vehicles (EVs). Benchmark Mineral Intelligence estimates that 2021 ended in a deficit position with total base-case battery demand expected to end the year at 419 GWh, translating to 409 kt of lithium carbonate equivalent (LCE) demand, up from 231 kt LCE in 2020.

 

Benchmark Mineral Intelligence estimates that the supply-demand balance will tighten further going forward, with 2022 forecasted to have a base case demand from battery end-use of 541 kt LCE, a 32% increase from 2021. This deficit position is expected to continue to increase, reaching a net deficit position of 156 kt LCE by 2030 and 2.1 Mt LCE by 2040.

 

Refer to Figure 19-1 below for a summary of Benchmark Mineral Intelligence’s lithium supply-demand forecast.

 

(graphic) 

 

Figure 19-1: Lithium Supply-Demand Forecast

 

The importance of end-use demand from EVs is further highlighted in Figure 19-2 and Figure 19-3 below, with Benchmark Mineral Intelligence estimating that approximately 79% of the total demand estimated in 2022 was from battery related end-uses.

 

Benchmark Mineral Intelligence estimates global EV penetration reached 7.9% in 2021, up from 4.0% in 2020, as global EV sales continue to accelerate, particularly from Europe and China. This figure is expected to climb to 21% by 2025 and reach 73% by 2040.

21501-REP-PM-001
Page | 381

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 (graphic)

 

Figure 19-2: Lithium Demand Breakdown by End-Use 2022

  

 (graphic)

 

Figure 19-3: Electric Vehicle Sales as a Share of Total Cars

 

19.2Lithium Supply Forecast

 

Benchmark Mineral Intelligence expects lithium supply to increase over the 604 kt LCE of total supply estimated in 2022, given the robust commodity price outlook for lithium. The majority of the 2022 lithium supply is expected to come from Australian hardrock producers, amounting to 47% of Benchmark Mineral Intelligence’s total estimated supply. Commensurate with the supply increase expected, including the entry of new producing mines discussed below, Benchmark Mineral Intelligence expects the lithium supply to be more diversified by 2031. However, the supply market will still be relatively geographically concentrated with Australia, Chile, China and Argentina contributing 66% of the total supply estimated by Benchmark Mineral Intelligence in 2031.

 

In the longer term, Benchmark Mineral Intelligence forecasts that the total lithium supply will reach 2.2 Mt LCE by 2030 and 3.7 Mt LCE by 2040. Benchmark Mineral Intelligence’s supply forecast includes expansions from existing mines as well as new entrants developing pre-production projects. In 2021, Benchmark Mineral Intelligence increased the likelihood of “possible” and “probable” lithium development projects to 60% and 75%, respectively (previous estimates were at a 25% and 55% likelihood). These probabilities have been maintained in Benchmark Mineral Intelligence’s Q1-2022 forecast. Additionally, Benchmark Mineral Intelligence’s supply model includes several early-stage projects, that are expected to define a resource or reserve and undergo feasibility studies and announce production forecasts within the next 6-12 months, in order to show a more complete pipeline of possible projects.

21501-REP-PM-001
Page | 382

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Refer to Figure 19-4 below for a summary of Benchmark Mineral Intelligence’s lithium supply forecast.

 

(graphic) 

 

Figure 19-4: Lithium Feedstock Supply Forecast

 

Historically, lithium carbonate has been the primary lithium chemical supplied to end-users, with Benchmark Mineral Intelligence estimating that it contributed 65% of total lithium chemical supply in 2020. This lithium chemical supply mix is expected to transition over the coming decades, with the lithium hydroxide and carbonate supply breakdown changing to 54% and 45%, respectively by 2040.

 

Refer to Figure 19-5 below for a summary of Benchmark Mineral Intelligence’s lithium chemical supply forecast.

 

(graphic) 

 

Figure 19-5 Lithium Chemical Supply Breakdown

 

Refer to Figure 19-6 below for a summary of the long-term C1 lithium carbonate cost curve considered by Benchmark Mineral Intelligence when making its long-term lithium supply forecast. As highlighted in Figure 19-6, all of the potential lithium supply modelled is economic at a LCE price above US$9,000/t, with the majority of projects and mines having C1 costs at or below US$6,000/t LCE.

21501-REP-PM-001
Page | 383

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 (graphic)

 

Figure 19-6: Long-Term Supply C1 Lithium Carbonate Cost Curve

21501-REP-PM-001
Page | 384

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

19.3Lithium Price Forecast

 

Lithium prices have increased materially as supply continues to fall short of robust demand. Additionally, contract prices have begun to be revised higher and producers are now seeking to introduce more regular pricing breaks in contract structures given the potential upside in lithium prices.

 

Tight market supply combined with rapidly improving demand for lithium chemicals is expected to put continued strong upward pressure on prices. Benchmark Mineral Intelligence’s base case forecast expects prices to continue to rise through 2023 as demand outstrips supply with real lithium hydroxide and spodumene 6% prices hitting US$33,900/t and US$2,900/t in 2023, respectively. Benchmark then expects prices to stabilize at higher levels in 2024 and begin to decline to more stable levels in a balanced supply-demand market in 2025. This balanced market forecast assumes substantial new supply, including new projects coming onstream (which are subject to delays and in some cases do not yet have production targets).

 

Figure 19-7 shows the forecast for battery-grade lithium hydroxide and lithium carbonate, while Figure 19-8 shows the forecast for 6% spodumene concentrate.

 

(graphic) 

Figure 19-7: Battery-Grade Lithium Chemical Price Forecast

 

Note: Shading indicates the area between bullish and conservative cases.

 

 (graphic)

 

Figure 19-8: Spodumene Price Forecast

 

Note: Shading indicates the area between bullish and conservative cases. 

21501-REP-PM-001
Page | 385

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

19.4Contracts and Off-Take Agreements

 

19.4.1Off-Take Agreements

 

19.4.1.1LG Energy Solution Ltd. Off-Take Agreement

 

On October 6, 2021, Sigma announced the signing of a binding term sheet for an off-take agreement on a “take or pay” basis (LGES Offtake) for the sale of up to 100,000 tonnes per year of battery grade lithium concentrate to LG Energy Solution, Ltd (LGES), one of the world’s largest manufacturers of advanced lithium-ion batteries for EVs.

 

The six-year LGES Offtake starts with 60,000 tonnes per year in 2023 and is expected to increase to 100,000 tonnes per year from 2024 to 2027 (Guaranteed Take-or-Pay Quantity), subject to Sigma and LGES executing mutually acceptable definitive documentation to implement the LGES Offtake. Sigma and LGES are also to negotiate each year, starting in 2022, an additional optional supply of battery grade lithium concentrate (Optional Offtake Quantity), not otherwise committed by Sigma in other offtake arrangements, as per the table below.

 

Pursuant to the LGES Offtake, Sigma will receive a price for the delivered battery grade lithium concentrate linked to the market prices for high purity lithium hydroxide.

 

Table 19-1 shows the delivery schedule under the agreement.

 

Table 19-1: Delivery Schedule Under the LGES Offtake

 

  2022 2023 2024 2025 2026 2027
Guaranteed Quantity
(in dry metric tonnes)
60,000 100,000 100,000 100,000 100,000
Optional Quantity
(in dry metric tonnes)
15,000 15,000 50,000 50,000 50,000 50,000

 

19.4.1.2Mitsui & Co. Ltd. of Japan Off-Take Agreement

 

On April 5, 2019, Sigma entered into a binding head of agreement (Mitsui Agreement) for a strategic offtake and funding partnership with Mitsui & Co., Ltd. of Japan (“Mitsui”) for a portion of the funding required for the capital expenditures and construction of the Xuxa mine.

 

Pursuant to the Mitsui Agreement, Mitsui and Sigma had agreed to the following terms:

 

·Production pre-payment to Sigma of US$30,000,000 for battery-grade lithium concentrate supply of up to 55,000 tonnes annually over six years, extendable for five years

 

·Offtake rights of a supplementary 25,000 tonnes of products over a period of six years, extendable for five years.

 

·Strategic collaboration to leverage Mitsui’s considerable global logistics and battery materials marketing expertise as well as an agreement to continue discussions regarding additional funding for further exploration and development of Sigma’s vast mineral properties.

 

·Selling price is based on quarterly published nominal arms-length price for chemical spodumene concentrate.

21501-REP-PM-001
Page | 386

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

An initial deposit payment of US$3.0 million was received by Sigma on April 4, 2019, but any further rights of the parties to the Agreement were subject to certain conditions not met, including the negotiation and execution of related definitive offtake agreements with Mitsui. It remains to be determined whether a mutually acceptable role for Mitsui can be agreed upon.

 

19.4.2Operational Contracts

 

Sigma has received proposals from different parties to establish the Project’s operations, but sill has no contracts signed in place in support of operations. Any future contracts are likely to be negotiated and renewed on an annual or biannual basis. Contract terms are expected to be typical of similar contracts in Minas Gerais State.

 

Contracts under negotiation include the following:

 

19.4.2.1Outsourcing of Mining Contract

 

Mining contractors provided all-in cost per tonne of ore mined offers, which will include drilling and blasting, mining of both waste rock and ore, dump development and supply all the necessary mining infrastructure. The contract is planned for an 8-year period. Outsourcing of mining is very common in the lithium industry.

 

19.4.2.2Road Transport Contract

 

Sigma received proposals for the transport by truck of 20,000 t of concentrate per month to the Port of Ilhéus.

 

19.4.2.3Port Handling Contract

 

Sigma received proposals for storing and loading of 20,000 t of concentrate at the Port of Ilhéus. The proposals include the following services: (i) receiving; (ii) stacks formation; (iii) loading in articulated buckets; (iv) port internal transport; (v) stowage of the ship; and (vi) SHINC Operation (nights, Sundays and holidays included).

 

19.4.2.4Power Contract with CEMIG

 

Sigma is currently negotiating an agreement (“Contrato de Uso do Sistema de Distribuição”) to establish the conditions, procedures, rights and obligations that will regulate the connection of the facilities of the Sigma’s consumption unit to the distribution system operated by Companhia Energética de Minas Gerais (“CEMIG”) and the use of this distribution system by the Company at the contracted voltage of 138kV.

 

19.4.3Construction Contracts

 

19.4.3.1Engineering, Procurement, Construction Management (“EPCM”) Contract

 

Sigma is currently negotiating an agreement for the EPCM of the Production Plant and associated infrastructure with engineering firm Promon. Detailed engineering is completed in a collaboration of Promon and Primero. The detailed engineering is progressing according to priority and both companies started issuing construction drawings according to the schedule baseline. Procurement services according to the Procurement Plan defined in the FEED. It will be attacked as a priority the purchase of equipment of the schedule critical path whose supplier documents release the largest possible front for detailed engineering and deployment strategy. Construction Management includes general scheduling, managing all items, generating weekly dash boards, preparing presentations with critical points, preventive and corrective actions in order to reach the project deadlines.

 

19.4.3.2Detailed Engineering

 

Sigma is currently negotiating an agreement for the Detailed Engineering of the Production Plant with engineering firm Primero. The scope of work encompasses design consultation, coordination, process design, and detailed engineering.

21501-REP-PM-001
Page | 387

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

19.4.3.3Civil Construction

 

Sigma has signed an agreement for the civil construction of the Production Plant with engineering firm Tucumann Engenharia e Empreendimentos Ltda (Tucumann). The scope of work includes all civil construction works and services for the implementation of the Project, including the supply of materials, commissioning, provision of documentation, topographic survey services, excavations, shallow foundations, concrete structures, buildings, paving, streets, urbanization and landscaping and rainwater drainage and spare parts.

 

19.4.3.4Substation and Transmission Line

 

Sigma has signed an agreement for the construction of a substation and the displacement of an existing transmission line with Tecnova Engenharia Ltda (“Tecnova”). The scope of work includes all civil construction, electromechanical and electrical assembly works and services for the implementation of the including, the civil project, the electrical project, the electromechanical project, the supply and installation of materials, structures and equipment, as well as commissioning, supply of documentation as built of the civil, electromechanical and electrical works, considering all the technical information informed by CEMIG.

 

19.4.3.5Laboratory

 

Sigma is currently negotiating an agreement for the construction of a laboratory with SGS Geosol Laboratórios Ltda (SGS Geosol). The scope of work includes all work for the management of the assembly of the Sigma’s internal laboratory and implementation, including the electrical project, the electromechanical project (including, but not limited to, the drawings, layouts, technical specifications, bills of materials, calculation memorials and documents), hydraulic design, supply and installation of materials, structures and equipment, as well as commissioning, start-up, supply of “as built” documentation of the projects, electromechanical, hydraulic and electrical, and all other services necessary for the execution of the scope of work.

21501-REP-PM-001
Page | 388

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

20ENVIRONMENTAL STUDIES, PERMITTING AND SOCIAL OR COMMUNITY IMPACT

 

Harpia Consultoria Ambiental provided the write-up and translation included in this section based on the Estudo e Relatorio de Impacto Ambiental or EIS (EIA-RIMA dated 30 October 2018 and Plano de Controle Ambiental – PCA dated December 2018). These documents were prepared and issued for submittal to the authorities by NEO Soluções Ambientais ATTO GEO Geologia e Engenheria and Vetor Ambiental.

 

20.1Environmental Considerations

 

20.1.1Environmental Permitting

 

In compliance with CONAMA Resolution 09/90, the environmental licensing of mining projects is always subject to an EIS, followed by an Environmental Impact Report (EIR), which supports the technical and environmental feasibility stage of the project and the granting of a Preliminary License (Licença Previa or LP) and/or a concurrent Preliminary Licence with an Installation License (Licença de Instalação or LI), collectively referred to as the (LP + LI).

 

The licensing process in Minas Gerais was developed in accordance with COPAM Regulatory Deliberation N° 217, dated December 6, 2017, which sets out the criteria that must be addressed based on the size of a planned mine, and its likelihood of generating environmental damage. Sigma has applied for an environmental license for approval of open-pit mining activities in respect of metallic minerals, except iron ore, with the following parameters:

 

·A gross production of 240,000 tpa

·40 ha for tailings/waste piles

·Dry and wet mineral processing plants with a capacity of 1,500,000 tpa.

 

A water usage license for the project of 150 m3 per hour has been granted.

 

The process of Concurrent Environmental Licensing Type CEL 2 LP and LI was submitted on December 20, 2018, as confirmed by receipt No. 0859841/2018, and was followed by the presentation of an EIS, EIR and an Environmental Control Plan (ECP).

 

The permit for the first phase of both the Preliminary License (LP) and the Installation License (LI) (i.e. for Xuxa North pit, processing plant and waste piles 1 and 2) was obtained on June 3, 2019. Approval of the Xuxa South pit and waste plies 3, 4 and 5 is expected by September 2021.

 

An updated economic plan (Plano de Aproveitamento Economico (PAE)) was approved by the ANM in August 2018. With these licences, construction and plant installation at the Xuxa project is approved.

21501-REP-PM-001
Page | 389

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 20-1 summarizes the granted Operations Licences, Environmental Operating Authorizations, and water leases within the Grota do Cirilo property. As indicated in the table, some of the licenses are under renewal, or are in the process of being updated.

 

Table 20-1 – Granted Licences and Leases

 

Number Area License Scope Project Phase License
Phase
Permit Period Status
Begin End  
0135/1994

931.012/1983

“Mining Group”

Operation

License

Production  

Aug. 25.1994

 

April 03 2003 Expired;
renewed in
2008
0029/2008

931.021/1983

“Mining Group”

Operation

License

Production Renewal Aug. 14.2008 Aug. 14.2014 Expired, and
voluntarily
not renewed
05782/2016

Faz. Monte Belo

 

Environmental
Operating

Authorization

Feasibility

(pilot stage production)

  Oct. 05.2016 Oct.20.2020 Valid
08190/2017

Faz. Barreiro

Barreiro

Environmental
Operating

Authorization

Feasibility

(pilot stage production)

  Nov. 14.2017 Nov. 14.2021 Valid
07137/2016

Faz. Maxixe

Lavra do Meio

Environmental
Operating

Authorization

Feasibility

(pilot stage production)

  Nov. 29.2016 Nov. 29.2020 Valid
08190/2017 Faz. Monte Belo Environmental
Operating
Authorization

Feasibility

 

(pilot stage production)

 

  Nov.11.2017 Nov.11.2021 Valid
36073/2016 Faz. Monte Belo Water Usage
License for
Small Volumes

Feasibility

(pilot stage production)

  Oct. 05.2016 0ct. 05.2019 Valid
43150/2016 Faz. Maxixe Water Usage
License for
Small Volumes

Feasibility

(pilot stage production)

  Nov. 29.2016 Nov. 29.2019 Valid
1064/2017 Faz. Monte Belo Water Usage
License for
Small Volumes

Feasibility

(pilot stage production)

  May 24.2017 May 24 2027 Valid
02500.001337
/ 2019-47
Faz. Monte Belo Water Usage
License
Stage production   Jan 14 2019 Jan 14 2029 Valid
281/2019 Grota Cirilo Environmental
Preliminary
License
Production   June 3 2019 June 3 2027 Valid
218/2019 Grota Cirilo Environmental
Installation
License
Production   June 3 2019 June 3 2027 Valid

 

Sigma has developed Reclamation of Degraded Areas Plans (PRADs) and implemented them for certain past-producing areas within the Grota do Cirilo property. The plans are managed by Sigma personnel and external consultants in conjunction with the governing regulatory agencies. PRAD documentation was submitted to the Superintendência Regional do Meio Ambiente – Jequitinhonha (SUPRAM) for approval, and Sigma was granted approval to conduct the activities outlined in the PRAD on May 18, 2017 (per OF SUPRAM JEQ Nr 363/2017). SUPRAM has reviewed the work done under the PRAD, and on March 22, 2018, provided approval under OF. DREG.SUPRAM Jequitinhonha no. 3012/2018.

21501-REP-PM-001
Page | 390

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

The PRADs are subject to periodic reviews and updates in response to new techniques, review of rehabilitation alternatives, adjustments for new mining activities and the restart of operations within previously mined areas.

 

Reviews conducted by third-party consultants William Freire and Neo Ambiental indicate that the existing environmental liabilities are related to small-scale artisanal mining that has not caused major environmental damage. Sigma is of the opinion that no rehabilitation of these areas is currently required, as rehabilitation would be conducted after Sigma’s mining activities at these deposits has been completed.

 

20.1.2Baseline Studies

 

A summary of the baseline studies completed is provided in Table 20-2.

 

Table 20-2 – Baseline Studies

 

Area Comment
Land use The current land uses include agriculture and subsistence farming.
Flora Flora zones includes savanna, riparian forests, seasonal forests and pasture lands. Most of the biotic zones have been disturbed by man and are in the process of regeneration.
Archaeology and cultural heritage No archaeological sites, indigenous lands or quilombo communities were identified in the Itinga municipal district. The Governmental Archaeological Agency inspected the proposed mine area and conformed that there is no archaeological sites

21501-REP-PM-001
Page | 391

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Area Comment
Special Areas No special areas were identified. The project site is not located within a Conservation Unit
Fauna

Studies conducted included avifauna (birds), herpetofauna (reptiles and amphibians), terrestrial macrofauna (large and medium sized mammals) and ichthyofauna (fish). 

A low number of endemic and specialist species were recorded in the field, demonstrating that the remaining natural areas have little capacity for the harboring of species that cannot withstand man-generated changes in their habitats. 

Climate The climate is continental-dry and warm, and has two clearly defined and distinct seasons, one dry, coinciding with winter in the southern hemisphere and the other wet, coinciding with summer

21501-REP-PM-001
Page | 392

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Area Comment
Water The Project is located in the Jequitinhonha River basin, spatially occupying the sub-basins of the Ribeirão Piauí and the Córrego Taquaral, which are direct tributaries of the Jequitinhonha River.
Soils Three major soil types were identified, consisting of latosols and podzolic soils
Geomorphology The general area is of low hills and fluvial flood plains
Caves No cave systems were identified.
Social setting Itinga municipality, existing local infrastructure, health status, and education status.

 

Additional studies should be completed and would include evaluation of greenhouse gases and ground water. Water from the Jequitinhonha and Paiu rivers are monitored monthly. Dust, noise, and vibration baselines have been determined and ongoing monthly monitoring continues.

 

20.1.3Water Considerations

 

All water drained and collected to settling ponds, will be recycled to water treatment and then to the process plant, or used in water trucks to spray the roads in the dry season. During the wet season, excess water from the pond will be discharged in an overflow channel. The rainfall water/effluent quality from the settling pond will meet the Brazilian Regulations parameters, according to CONAMA 430 - Section II and/or groundwater analysis. For the analysis of surface water, CONAMA 357/2005 shall be followed; for groundwater, CONAMA 396/2008 and CONAMA 420/2009.

21501-REP-PM-001
Page | 393

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

  

20.1.4Acid Rock Drainage

 

An assessment was conducted to identify the potential for acid rock drainage (ARD), with an emphasis on standard static tests, including modified acid base accounting (ABA), and kinetic tests, specifically the humidity cell test.

 

ABA tests were conducted at SGS Geosol on a total of 20 samples from five drill holes.

 

Using net neutralization potential (NNP) criteria, 15 samples out of the 20 samples tested are in the uncertain range, and the remaining five samples tested were non-acid generating.

 

The neutralization potential ratio (NPR), which is based on the ratio between acid generation potential (AP) and neutralization potential (NP), was evaluated. Thirteen samples were non-acid generating, but four samples had 1<NPR<2 suggesting potential for acid generation.

 

In addition to the above test work on 20 samples, SGS Lakefield conducted a single humidity cell test. The tested sample had ten-parts waste rock (schist) and one-part DMS tailings. Findings include:

 

·The pH fluctuated between 6.55 and 7.31, which is in a circumneutral pH range (6.5–8.3). In general, measured alkalinity values were much greater than measured acidity, which is indicative of dominant buffering capacity conditions

·The electrical conductivities of weekly collected effluent ranged from 32 to 95 µS/cm, which is indicative of low ionic constituents of water

·Some heavy metals and toxic elements, such as As and U, were detected by analysis of effluent chemistry, but their corresponding concentrations were generally much lower than is permitted by the Canadian guideline for drinking water

·The ABA test result on the humidity cell sample suggested 5.15 kg CaCO3/t for NP and 2.5 kg CaCO3/t for AP. Based on the ABA test result and the depletion rate calculation over the course of the humidity cell, the sulphide content in the waste depleted at a faster rate than the sample NP, which suggests negligible acid or metals release for this composite sample

·It was concluded that localized ARD generation may occur due to the presence of pyrite and reactive sulphur bearing minerals in the waste rock and tailings.

·Supplementary laboratory tests are planned in accordance with the Canadian Mine Environment Neutral Drainage (MEND) procedures for acid rock drainage (ARD) definition and control for waste rock, tailings (+0.5 mm and -0.5 mm) and combined waste and +0.5 mm tailings as follows:

·Waste rock: modified ABA tests on new set of samples, net acid generation testing (NAG) and humidity cell kinetic testing (4 cell tests: mix of samples with ARD generating conditions, mix of samples with uncertain conditions, +0.5 mm tailings and -0.5 mm tailings)

·Tailings (+0.5 mm and -0.5 mm): modified ABA tests

·Combined waste and +0.5 mm tailings: XRF and XRD analyses.

·

 

20.2Permitting Considerations

 

Sigma has obtained all major licenses and permits except for the final operation license (LO) as stated in sub-section 20.1.1.

 

20.2.1Authorizations

 

20.2.1.1Federal

 

SMSA is the owner of the mining rights registered under DNPM Nº 824.692/1971, and the holder of Mining Concession Ordinance Nº 1.366, published on October 19, 1984. In 2018 a new Economic Development Plan (EDP) was registered with the National Department of Mineral Production (DNPM) and the National Mining Agency (ANM), which was approved on November 16, 2018.

21501-REP-PM-001
Page | 394

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

  

20.2.1.2State

 

The environmental licensing process for the project was formalized on December 20, 2018, in accordance with protocol 0859841/2018, under type CEL 2 (LP + LI), in accordance with DN 217/20171.

 

In order to formalize the Concurrent Environmental Licensing process CEL 2 LP and LI, the EIS, EIR and ECP, listed in Basic Guidance Form (BGF) No 0751216/2018 A were submitted as required.

 

The approval process involves a technical and legal analysis conducted by the environmental regulator. Upon being granted the LP + LI, the company must build the project, comply with the environmental conditions established in the LP + LI certificate and finally, apply for the Operation License to begin operational activities.

 

The formalization of the environmental licensing process also includes the requesting and granting of the environmental intervention authorization.

 

20.2.1.3Environmental Intervention Authorization - EIA

 

The environmental intervention process was applied for on December 20, 2018, under registration No 0859842/2018.

 

The purpose of this authorization is to allow for environmental intervention in an area of about 63.9 ha of native vegetation. Current legislation (Federal Law 11.428 / 2006) establishes a mining enterprise as a public utility, and therefore allows for intervention in the form of the removal of vegetation that is in the middle stage of regeneration, provided the proper environmental and forestry compensation is applied. The compensations listed in Table 20-3 will therefore apply to the project:

 

Table 20-3 – Applicable Environmental Compensation

 

Compensation Situation Legislation
Environmental Ventures of significant environmental impact. SNUC Law Nº 9.985/2000, dated 18 July 2000.
Suppression of Vegetation Mining ventures that depend on the removal of vegetation in the advanced and medium stages of regeneration. DN COPAM N°73/2004, dated 8 September 2004, Law Nº 11.428, dated 22 December 2006 and IEF Ordinance Nº 30, dated 03 February 2015.
Mining Mining venture that depends on the removal of native vegetation. Law N° 20.922, dated 16 October 2013 and IEF Ordinance Nº 27, dated 07 April 2017.

 

20.2.1.4Water Usage Permit

 

Sigma has been granted a permit for 150 m3/h of water from the Jequitinhonha river for all months of the year by the Agencia Nacional das Águas (ANA) for a period of 10 years. The process was formalized in February 2019 under registration number 02501.004570/2018-91.

 

20.2.2Municipal

 

The project must comply with municipal legislation and the declarations were issued by both the Itinga and Araçuai town councils.

21501-REP-PM-001
Page | 395

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

  

20.2.3Surface Rights

 

Sigma has a lease agreement with Miazga, owner of the Poço Danta-Paiuí, Poço Danta and Poço Dantas Farms, to carry out mining activities on its properties. These farms include Legal Reserves (LR) which are preserved and registered in the National Rural Environmental Registration System (NRERS), in accordance with Law Nº 12.651, dated May 25, 2012. The location of the properties and the respective Legal Reserves are:

 

·The Poço Danta-Piauí Farm has a total area of 86.5415 ha, of which 17.3083 ha is designated a Legal Reserve (LR), preserved for the native species of the region, and which shall not be less than 20% of the total property. The reserve will not be affected by the proposed mine.

·The Poço Danta Farm has a total area of 97.3467 ha, of which 19.4693 ha is designated a Legal Reserve (LR), preserved for the native species of the region, 20% of the total property. The reserve will not be affected by the planned mine.

·The Poço Dantas Farm has a total area of 80.00 ha, of which 16.00 ha is designated a Legal Reserve (LR), preserved for the native species of the region, 20% of the total property. The reserve will not be affected by the proposed mine.

·Sigma are leasing the following farms: Lucinéia Fátima de Souza, Demostenes Vieira Filho, Jose Antonio Teixeira dos Santos, Ildete Faria, Vanusia Santos, Nixon Borges, Sandro Araújo, Claudenice Silva, Ustane Ribeiro, Nizoeiro Souza, Lourivaldo Araujo and Joaquim Ferreira Santos.

 

Figure 20-1 shows the locations of the farms and protected areas.

 

 

Figure 20-1 – Location of Areas of Interest and Properties 

21501-REP-PM-001
Page | 396

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

  

20.3Social Considerations

 

20.3.1Project Social Setting

 

The project is located in the properties known as Poço Dantas Farm, Poço Danta Farm and Poço Danta-Piauí Farm, in the rural area of Itinga. Research by the Brazilian Institute of Geography and Statistics (IBGE) (2010) indicates that Itinga has a population of 14,407 inhabitants.

 

There are few “neighbouring” communities. The closest significant communities to the project are: Ponte do Piauí, Poço Dantas and Taquaral Seco, located 0.40 km, 0.71 km, and 1.50 km, respectively. Slightly further away, but still potentially affected by planned mining activities, is the district of Taquaral de Minas (4.27 km).

 

The areas surrounding the project are sparsely populated, with little vehicular traffic. The villages are mainly concentrated along BR 367 and in the municipal district of Araçuaí, which has approximately 40,000 inhabitants. The main economic activities of the region are subsistence agriculture and small livestock farming.

 

20.3.2Sigma Consultations

 

Sigma maintains an excellent relationship with the communities throughout the municipalities of Itinga and Araçuaí, having held regular meetings and consultation sessions with local stakeholders over the last five years. The development of mining activities by Sigma in the Jequitinhonha Valley is viewed by both communities as an important economic driver in the region, which has been significantly impoverished by regular droughts afflicting the semi-arid region.

 

As part of its engagement in promoting the development of the region, SMSA has sponsored the creation of a regional multi-jurisdictional commission and held a symposium for this commission to discuss regional development joint initiatives at its operational headquarters in Itinga on December 13, 2017. Three Minas Gerais state attorneys, one Federal state attorney, two officers from the Ministry of Defense, two officers from Departmento de Ciência e Tecnologia Aeroespacial (DCTA), and one director from IBRAM in Minas Gerais State, were in attendance.

 

In support of local community relationships, Sigma was formally recognized in the local business environment by the mayor of Itinga on December 30, 2017.

 

Sigma held six meetings in 2018 with representatives from communities within the Grota do Cirilo area to discuss the Project. These meetings provided opportunities for Sigma to understand community expectations for the Project. Meetings were held as follows:

 

·October 12 and October 24, 2018: community of Taquaral Seco

·October 13 and October 25, 2018: community of Piaui-Poco Dantas

·October 14 and October 26, 2018: community of Ponte Piuai

 

A further 29 community meetings were held in 2020, 37 community meetings in 2021 and 18 community meetings year-to-date in 2022. A summary of these meetings is:

 

·Meetings in 2020: 6 - Date of the last meeting: 25 November: community of Taquaral Seco

·Meetings in 2020: 8 - Date of the last meeting: 26 November: community of Piaui-Poco Dantas

·Meetings in 2020: 6 - Date of the last meeting: 26 November: community of Ponte Piuai

·Meetings in 2020: 9 - Date of the last meeting: 26 November: community of Taquaral de Minas

·Meetings in 2021: 10 - Date of the last meeting: 22 November: community of Taquaral de Minas

·Meetings in 2021: 9 - Date of the last meeting: 23 November: community of Taquaral Seco

·Meetings in 2021: 10 - Date of the last meeting: 23 November: community of Piaui-Poco Dantas

·Meetings in 2021: 8 - Date of the last meeting: 26 November: community of Ponte Piuai

21501-REP-PM-001
Page | 397

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

  

·Meetings in 2022: 4 - Date of the last meeting: 22 April: community of Taquaral de Minas

·Meetings in 2022: 6 - Date of the last meeting: 23 April: community of Taquaral Seco

·Meetings in 2022: 4 - Date of the last meeting: 23 April: community of Piaui-Poco Dantas

·Meetings in 2022: 4 - Date of the last meeting: 26 April: community of Ponte Piuai

 

The meetings indicate that Sigma has had a positive community impact and the general opinion of the local communities is that Sigma has already generated more employment opportunities and improved some of the local infrastructure.

21501-REP-PM-001
Page | 398

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

20.4Evaluation of Environmental Impacts and Mitigation Actions

 

Table 20-4 provides a summary of environmental impact minimizing measures.

 

Table 20-4 – Environmental Impact Minimization Measures

 

Minimization Measures Objectives
Program for the management and control of water resources and effluents The program aims to adopt environmental control measures through the treatment of domestic and industrial effluents originating from the implementation and operation of the venture.
Program for the implementation of a system of drainage erosion control The objective was to establish measures to conserve soil and water, through the implementation of a rainwater drainage system employing specialized techniques.
Program for controlling atmospheric emissions and noise and vibration levels This program aims to promote, by technical means, the prevention and control of atmospheric emissions and the levels of noise and vibrations from mining activities.
Solid Waste Management Program To establish proper procedures for the management of the solid waste generated during the installation and operation of the mine, by reducing the generation, handling, packaging, storage, transportation, treatment and final disposal of the same, in accordance with current regulations.
Reuse of tailings program The objective of this report is to describe the feasibility of the use of the tailings/waste generated by the process of exploitation of pegmatite of the Sigma mining venture.
Environmental Education Program – EEP The EEP has the general aim of mobilizing and raising the awareness of employees and the community located in the Area of Indirect Influence (AII) of the venture, regarding the importance of environmental conservation, through activities that seek to raise awareness of the topics addressed.
Program of prioritization and professional training of human resources and local suppliers Create strategies of human resource training to provide opportunities for growth and development for the internal workers of the company and the region through courses focused on the importance of the enterprise, in partnership with the public and private educational institutions of the region.
Accident prevention and public health program Adopt measures to ensure the integrity, health and safety of employees, as well as comply with Regulatory Standard NR-22, which establishes obligations upon employers to coordinate, establish and implement measures of employee safety and health.
Social communication program To promote practices of social and environmental responsibility, based on ethics and the transparency of information related to the enterprise. Develop continuous and transparent communication between the company, the local community and inspection agencies.
PPA and Legal Reserve maintenance program To guarantee the conservation of the Permanent Preservation Areas (PPA) and Legal Reserve (LR) and provide compensation to avoid the loss of flora species, mainly aquatic macrophytes, to sow propagules, to protect the water body and to care for fauna by offering suitable areas for their survival.
Program for the rescue and prevention of flight of local wildlife The Fauna Rescue Program aims to avoid the mortality of the fauna and allow animals to continue occupying the region, as well as to contribute to the scientific research into the fauna during the removal of the vegetation by the mining project. (Figure 20-2)

21501-REP-PM-001
Page | 399

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Minimization Measures Objectives
Endangered and threatened species rescue program The objective is to rescue matrices of endangered species, whether endemic or of great socioeconomic importance in the area. These are housed in a seedling nursery for future reintroduction in the areas to be recovered.
Management and environmental supervision plan The Plan is to ensure that programs related to all types of activities are developed in a rigorous manner in compliance with legislation.
REHABILITATION MEASURES AIMS
Degraded Area Recovery Plan (DARP) The main objective of this plan is to restore areas that will be affected by the mining process in the area, through the application of recovery techniques, such as the planting of vegetation, seeking a harmony between the environment and human beings. (Figure 20-2)
COMPENSATION MEASURES AIMS
Environmental compensation Repair to an equivalent degree, based on the negative environmental impacts that cannot be mitigated. “Environmental compensation may only be used if a sine qua non condition is met, which is the full demonstration of the partially or totally irrecoverable nature of the adversely affected environment.”
Mine closure plan The closure plan is based on assessments of available technical information and local conditions throughout the life of the venture.

21501-REP-PM-001
Page | 400

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 20-2: Sigma Wildlife Rehabilitation Centre and Seedling Nursery

 

20.5Waste and Water Management

 

Provision has been made for the waste rock and tailings piles for storage of waste rock from the mining pit and the tailings from the process plant.

 

The waste rock and tailings piles are designed to rigorous geotechnical and environmental standards.

21501-REP-PM-001
Page | 401

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

There are several options for the management and closure rehabilitation of these facilities. These include capping with a stable cover that minimises potential for erosion and supports revegetation (refer to Section 20.7). For water management refer to Section 20.1.3.

 

20.6Relations with Stakeholders

 

Sigma understands and accepts the importance of proactive community relations as an overriding principle in its day-to-day operations as well as future development planning. The company therefore structures its community relations activities to consider the concerns of the local people and endeavors to communicate and demonstrate its commitment in terms that can be best appreciated and understood to maintain the social license to operate.

 

The Jequitinhonha valley is the poorest region in Minas Gerais which is plighted by poverty and is in the lowest quartile of the Human Development Index (HDI). Sigma will be the largest investment and operation in the area by a factor of ten and the project will be transformational to the local communities. The largest direct economic benefit is that Sigma is subject to a 2% royalty on revenue which is divided between Federal Government, State Government and Local Government. Secondly a portion of the taxes on local procurement of goods and services is shared with the Local Government.

 

These incomes from the royalty and tax is a most important source of funding for local Government and Sigma will be the largest direct contributor in the region. Sigma will be by far the largest employer in the region with an estimated 500 direct jobs being created with three to four times this number being indirect.

 

Farming in the area is small scale subsistence type as the area is semi-arid. There will be minimal impact on the farms neighbouring the Grota do Cirilo property. It is envisaged that Sigma employees and the contractor workforce will live in the cities of Araçuaí and Itinga.

 

Strict environmental management plans are in place to minimize the project environmental footprint. An example is that 90% of the process water will be re-circulated and there will be zero run-off water from the site, except during the wet season, where excess water from the pond will be discharged in an overflow channel. The process will use dry stacking technology and no slimes dam will be built. Regular environmental monitoring will be conducted, and results will be shared with the local communities.

 

Sigma has identified and continues with consultations/engagements with numerous stakeholders in support of the project development which include the following:

 

·Communities

·Local municipal authorities of Intinga and Araçuaí

·Religious leaders in Itinga and Araçuaí

·The University of UNIP and Youth leaders in Araçuaí

·Regional Town Hall meeting with General Public and Commercial Society

·Consultations with local communities of Taquarl Seco, Poco Dantes and Paiu

·Local Environmental authority of Araçuaí and Itinga

·Regulatory and Government institutions

·Federal Department of Mines (ANM) in Brasilia

·Minas Gerais Department of Mines (ANM) in Belo Horizonte

·State Environmental Regulator (Supram) in Belo Horizonte

·Regional Supram regulator in Diamantina

·FINEPA (Financiadora de Estudos e Projectos) in Rio de Janeiro

·INDI the Minas Gerais Agency responsible for the Promotion of Investment and Exports

21501-REP-PM-001
Page | 402

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Sigma has sponsored a number of local sporting and community invents in Araçuaí and Itinga. Sigma has provided 7,000 monthly food parcels during the period of the pandemic and has agreed to supply a further 7,000 by the end of 2022. Sigma has donated 24 tons of disinfectant and 24 tons of hand sanitizer to the local hospitals and clinics over the period of the pandemic. The company has donated materials for the building and repairing of roads in Itinga and Araçuai, jointly sponsored the upgrade of the Headquarters of the Police, provided a 4x4 vehicle to the Environmental Police and continues to be supportive of community needs. Sigma also established and sponsored a Local Development Agency to attract further investment to the area. There have been numerous site visits from representatives of various governmental regulator bodies, governmental agencies as well as from various regional and state Universities.

 

20.7Rehabilitation and Closure Planning

 

The rehabilitation and closure plan consist of three main stages:

 

1.Decommissioning planning

2.Execution of decommissioning

3.Implementation of the socio-environmental and geotechnical follow-up and monitoring actions of the post-closing.

 

Waste piles will be graded as needed, capped with a vegetation suppression layer and revegetated with herbaceous-shrub species. A final protective cover can be placed over the pile to facilitate revegetation and minimize erosion, at which point the sedimentation pond may be decommissioned. A cap layer of soil will be placed and seeded on the open pit berm areas. A fence will be built around the open pits, and all mine haul roads will be blocked off.

 

Sigma has confirmed that there are no requirements for reclamation bonds.

 

20.7.1Decommissioning Planning

 

The decommissioning planning comprises the following basic activities:

 

·Study of the local environment

·Preparation of the Closure Plan on a deposit-by-deposit basis.

 

21501-REP-PM-001
Page | 403

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

20.7.2Execution of Decommissioning

 

The Xuxa pit will be closed after its planned mine life of just over nine years. However, as Sigma will be mining Phase 2 and 3 and other deposits in the Grota do Cirilo area, the process plant will remain operational after the Mineral Reserves at the Phase 1 (Xuxa deposit) are exhausted. The following assumptions were considered for the execution of the decommissioning (Table 20-5).

 

Table 20-5 – Environmental Impact Minimization Measures

 

Area Activity
Restoration

Restoration shall be executed according to the specific characteristics of the land where mining is located. The objective will be to reconstitute the vegetal cover of the soil and the establishment of the native vegetation after the operation of the enterprise.

In the post-closure phase, the monitoring program should be carried out, to follow the conditions of physical and biological stabilization of the areas to ensure the adequate restoration of the ecosystem

Waste rock & dry tailing co-disposal stockpiles / waste rock disposal stockpiles / overburden pile The waste piles will be graded as needed, capped with a vegetation suppression layer and revegetated with herbaceous-shrub species. A final protective cover can be placed over the pile to facilitate revegetation and minimize erosion, at which point the sedimentation pond may be decommissioned
Water management The removal of the suppressed vegetation and the topsoil, topographic review and slope cover and surface drainage should be specified and performed.
Site safety To ensure site safety a fence must be built around the mine pit and to block the mine haul road. This fence may be made of barbed wire.
New & used controlled products Not applicable. Use of controlled products in mine operation is not part of the Closure Planning.
Soils and contaminated materials For areas of the mine support facilities, it is recommended to carry out environmental liability assessment studies, particularly in locations of fuel tanks, substations, among others, where there may be spillage and consequent contamination of soil and water. If necessary, a company specializing in safety disposal could be hired.
Open pit For revegetation of the open pit berm areas, a cap layer of soil shall be placed and seeded. A fence shall be built around the open pit.
Financial guarantee (reclamation bonds) Sigma has confirmed that there are no requirements for reclamation bonds.

 

20.7.3Monitoring Program and Post-Closure Monitoring

 

In the post-closure phase, a socioenvironmental and geotechnical monitoring program will be carried out, to support ecosystem restoration or preparation for the proposed future use.

 

The monitoring program will collect soil and diversity of species on an annual basis, continuing for a five-year period after mine closure.

 

20.8Phase 2 Barreiro Pegmatite Environmental Work

 

The information provided in this section is based on the Environmental Impact Study and Environmental Impact Report (EIA – RIMA) prepared by Vetor Ambiental e Urbanística on May 20, 2021.

 

20.8.1Considerations

 

The Environmental Impact Study - EIA and its respective Environmental Impact Report - RIMA will be submitted to the regulatory agency, Bureau of Priority Projects - SUPPRI, as a supporting document to obtain a Preliminary License - LP and an Installation License - LI for Grota do Cirilo Project - Barreiro Pegmatite.

 

Considering the parameters defined by the current laws and regulations, CONAMA Resolution 09/90, the environmental licensing of mining projects is conditioned to EIA/RIMA submission, and these studies are the main technical resources to assess project feasibility.

 

This document has been drafted by a multidisciplinary technical team in strict compliance with the relevant laws and regulations, as well as with the General Reference Term for Mining made available by the State Secretariat for the Environment and Sustainable Development - SEMAD on its website, outlining criteria and guidelines for EIA/RIMA execution and drafting.

21501-REP-PM-001
Page | 404

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

20.8.2Environmental Licensing

 

The project falls under the Concurrent Environmental Licensing modality - LAC1, according to Environmental Policy Council - COPAM Normative Deliberation - DN No. 217/2017. In this modality, the stages of environmental feasibility, installation, and operation of the project will be analyzed in consecutive phases and a Preliminary License - LP and an Installation License will be granted if all stages are approved.

 

The environmental licensing process started in October 2020 and will be formalized with the submission of the technical studies requested through the Environmental Licensing System - SLA, request No.: 2020.10.01.003.0003780 for the production of: 1,850,000 t/year for open pit mining and 251.89 ha for waste heaps. According to the application to be filed, the project is predominantly classified as Class 4, location criterion 1, defined by the following activities, which have been analyzed individually:

 

·A-02-01-1 - Gross production of 1,850,000 t/year from open pit mining;

·A-05-04-6 - Tailing/waste heap of ornamental and coating rocks, pegmatites, gemstones, and non-metallic minerals.

oWaste piles 01: 127 ha

 

Sigma Mineração S.A. has a certificate of Concurrent Environmental License (LP + LI) No. 281, granted on October 8, 2019, valid for 06 years. This license refers to Grota do Cirilo Project - Xuxa Pegmatite - North Pit, where the following structures were licensed:

 

·The mine pit (open pit mining);

·Tailings;

·Dry Ore Treatment Unit and Wet Ore Treatment Unit;

·Supply stations.

 

The mineralized material proposed to be mined in the Barreiro Project will be processed in the Ore Treatment Unit part of the aforementioned license. Table 20-1 summarizes the Environmental Licenses granted, Environmental Authorizations and Water Grants required for project operation. As indicated in the table, some of the licenses are being renewed or updated.

 

The studies carried out describe and analyze the physical, biotic, and socioeconomic environments to describe and interpret the resources and processes that may be affected by the activities planned for the project. Elements vulnerable to direct or indirect impacts to be caused by the project have been identified and analyzed, considering project planning, installation, operation, and decommissioning, focusing on the most significant aspects.

 

This is intended to provide an overview of the situation of the environment susceptible to the impacts generated by the project, whether such impacts are positive or negative, for a comparison between the current condition of the area and the scenario foreseen after project approval and implementation.

21501-REP-PM-001
Page | 405

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

20.8.3Baseline Studies

 

A summary of the studies performed can be found in the Table 20-6 below.

 

Table 20-6 – Environmental Studies

 

Area Comment
Land use The current land uses include agriculture and subsistence farming.
Flora Flora zones include savanna, riparian forests, seasonal forests and pasture lands. Most of the biotic zones have been disturbed by man and are in the process of regeneration.
Archaeology and cultural heritage No archaeological sites, indigenous lands or quilombo communities were identified in the Itinga municipal district. The Governmental Archaeological Agency inspected the proposed mine area and conformed that there are no archaeological sites
Special Areas No special areas were identified. The project site is not located within a Conservation Unit
Fauna Studies conducted included avifauna (birds), herpetofauna (reptiles and amphibians), terrestrial mammalian fauna (large and medium sized mammals) and ichthyofauna (fish).
A low number of endemic and specialist species were recorded in the field, demonstrating that the remaining natural areas have little capacity for the harbouring of species that cannot withstand man-generated changes in their habitats.
Climate The climate is continental-dry and warm, and has two clearly defined and distinct seasons, one dry, coinciding with winter in the southern hemisphere and the other wet, coinciding with summer
Water The Project is located in the Jequitinhonha River basin, spatially occupying the sub-basins of the Ribeirão Piauí and the Córrego Taquaral, which are direct tributaries of the Jequitinhonha River.
Soils Three major soil types were identified, consisting of latosols and podzolic soils
Geomorphology The general area is of low hills and fluvial flood plains
Caves No cave systems were identified.
Social setting Itinga municipality, existing local infrastructure, health status, and education status.

 

Additional studies are underway and would include greenhouse gas assessment, additional tests on Piauí River and water responses to water treatment plans, noise and vibration baselines, and particulate matter baseline studies.

21501-REP-PM-001
Page | 406

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

  

Figure 20-3 to Figure 20-5 show examples of the avifauna, herpetofauna and terrestrial mammalian fauna respectively that were recorded on the Barreiro project property.

 

 

Figure 20-3: Avifauna: A) Nest of Red Ovenbird; individual of B) Red-Cowled Cardinal, C) Grassland Sparrow; D) Smooth-billed Ani; E) Rufous-collared Sparrow; F) Tropical Kingbird; G) Burrowing Owl and H) Yellow-chevroned Parakeet.

 

 

Figure 20-4: Herpetofauna: A) Neotropical Ameiva, B) Tropidurus oreadicus, C) Leptodactilus fuscus; D) Tegu; E) Rhinella granulosa and F) Rhinellaschneideri.

21501-REP-PM-001
Page | 407

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

  

 

Figure 20-5: Terrestrial mammalian fauna: A) wild dog; B) skunk; C) big-eared opossums; and D) footprint of Procyon cancrivorus.

 

20.8.4Water Considerations

 

Rainwater will be drained and collected in decantation ponds, which will then be treated and will follow to water trucks used to spray roads during the dry season. This will reduce the volume of water taken from Jequitinhonha River. During the rainy season, excess water from the ponds will be discharged into an overflow channel. The quality of reused water will follow the Brazilian Regulation, under CONAMA 357/2005; CONAMA 396/2008, and CONAMA 420/2009.

 

It should be noted that Barreiro Project will not require new water consumption since Sigma already has a Water Use Grant, license No. 02500.001337 / 2019-47

 

20.8.5Considerations about the Permit

 

Sigma has obtained all major licenses and authorizations, except the final operating license (LO), as stated in subsection 20.8.2.

 

20.8.5.1Authorizations

 

20.8.5.1.1Federal

 

Concerning Mineral Rights, Sigma Mineração holds right No. 931.021/1983, which comprises a group of mining concessions, as listed below:

 

·824.695/1978;

·810.345/1968;

·005.804/1953;

·832.075/2001;

·831.116/2016;

·9135/1967.

 

The Mineral Right No. 804.541/1971 is in the Mining Application phase. The operation of the project will start after the granting of the mining concession and the environmental license. Sigma will apply to the ANM for the mining easement areas necessary for project implementation, in a total of 388.49 ha, to house waste piles, pits, and accesses. So far, the company has carried out research works only in the area. Mining activities will begin according to the company’s strategic planning, and social and environmental reorganization. The Figure 20-6 below shows the Status Plan, with location of ANM mining applications.

21501-REP-PM-001
Page | 408

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

  

 

Figure 20-6 – Project Status Plan with Mining Applications

 

20.8.5.1.2State

 

The project’s environmental licensing process will be formalized through the Environmental Licensing System (SLA) on an online platform as per DN 217/20171. To formalize the LAC1 Concurrent Environmental Licensing process (LP + LI), the EIA / RIMA, the Environmental Control Plan - PCA, and the Degraded Area Recovery Plan - PRAD must be submitted, as required.

 

The approval process includes a technical and legal analysis carried out by the environmental regulatory agency. Upon obtaining the LP + LI, the company must implement the project complying with the environmental conditions established in the LP + LI certificate to be obtained after appreciation by the regulatory agency. Finally, the company will apply for the Operating License to start operating activities. Environmental licensing process formalization also includes applying for and granting of the authorization for environmental intervention. 

21501-REP-PM-001
Page | 409

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

  

20.8.5.1.3Environmental Intervention Authorization - AIA

 

The purpose of this authorization is to allow environmental intervention in an area of approximately 65.9 ha of native vegetation. The current legislation (Federal Law 11.428 / 2006) provides for mining projects as a public service and, therefore, allows intervention in the form of clearance of the vegetation that is in an intermediate stage of regeneration and removal of protected species, provided they are properly entered in an inventory list and the proposed reforestation plan is legally enforced. The compensations listed in Table 20- will therefore apply to the project:

 

Table 20-7 – Environmental Compensations

 

Situation Legislation
Environmental Ventures of significant environmental impact.

SNUC Law N 9.985/2000, dated 18 July 2000. 

Suppression of Vegetation Mining ventures that depend on the removal of vegetation in the advanced and medium stages of regeneration. DN COPAM N°73/2004, dated 8 September 2004, Law Nº 11.428, dated 22 December 2006, and IEF Ordinance Nº 30, dated 03 February 2015.
Mining Mining venture that depends on the removal of native vegetation. Law N° 20.922, dated 16 October 2013 and IEF Ordinance Nº 27, dated 07 April 2017.

 

20.8.5.1.4Water Use Authorization

 

Sigma was granted 150 m3/h of water from Jequitinhonha River every month of the year by the National Water Agency (ANA) for a period of 10 years. The process was formalized in February 2019 under registration number 02501.004570 / 2018-91.

 

20.8.5.2Municipal

 

The project must comply with municipal legislation and declarations of the City Council of Itinga.

 

20.8.5.3Surface Rights

 

Sigma is under commercial negotiation with landowners located in the area of Barreiro Pegmatite Project. Negotiations for the lease or purchase of properties are carried out in accordance with the current legislation and are not considered to be obstacles to project implementation in the region. It is worth mentioning that this region is characterized by a low-income population, and any money generated, whether by sale or lease, creates expectations for the players involved. The area covered by the project occupies 5 rural properties. Table 20-8 shows the surface areas, the properties, and their respective legal reserve areas.

 

Table 20-8 – Environmental Compensations

 

Owner Property Municipality Property area
(ha)
Used area (ha) Legal reserve (ha)
- Property 01 Itinga 89.94 ha 6.4 19.26 Proposed
Sigma Property 02 Itinga 127.92 ha 71.38 55.81 Registered
Sigma Property 03 Itinga 30.40 ha 11.4 No data
- Property 04 - Fazenda Brejo Itinga 1,377.73 ha 37.098 307.72 Registered
- Property 05 - Diguinho Itinga No data No data No data

 

20.8.6Social Considerations

 

20.8.6.1Social Setting of the Project

 

The project is located on properties called Fazenda Brejo, in the rural area of Itinga. Research by the Brazilian Institute of Geography and Statistics (IBGE) (2010) indicates that Itinga has a population of 14,407 inhabitants.

 

Barreiro Community is located approximately 22 km from the urban area of the municipality of Araçuaí, located near BR 367 highway, with part of its territory on the left bank and part on the right bank of Piauí River, being characterized by a low-income population with little access to healthcare and education.

21501-REP-PM-001
Page | 410

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

  

The surrounding areas of the project are sparsely populated, with few vehicles traveling by. The communities are mainly concentrated along BR 367 highway and in the municipality of Araçuaí that has approximately 40,000 inhabitants. The main economic activities in the region are agriculture and livestock.

 

20.8.6.2Sigma Consultations

 

A quantitative and qualitative analysis was carried out in the entire project area to collect information about the social and environmental perception of Barreiro community regarding project implementation.

 

GPS Garmin 64s and Etrex 10 socioeconomic forms were used to map out households in the field, during the interviews, and a camera was used for photography recording.

 

The form used during the interviews aimed to collect information about the socio-environmental status of the population, such as the economic activities carried out on the properties and basic infrastructure (water, energy, and sewage), as well as any expectations regarding the project. The meetings took place between the 20th and the 23rd March 2021 and the community strongly supported Sigma project. When interviewees were questioned about the potential benefits of the project for local families and the region, they mentioned employment, increased income, contributing to local development, and improved road infrastructure.

21501-REP-PM-001
Page | 411

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

20.8.7Assessing Environmental Impacts and Mitigation Actions

 

Table 20-9 summarizes the measures that have been planned to minimize environmental impact.

 

Table 20-9 – Measures to Minimize Environmental Impacts

 

Minimization Measures Objectives
Program for the management and control of water resources and effluents The program aims to adopt environmental control measures through the treatment of domestic and industrial effluents originating from the implementation and operation of the venture.
Program for the implementation of a system of drainage erosion control The objective is to establish measures to conserve soil and water, through the implementation of a rainwater drainage system employing specialized techniques.
Program for controlling atmospheric emissions and noise and vibration levels This program aims to promote, by technical means, the prevention and control of atmospheric emissions and the levels of noise and vibrations from mining activities.
Solid Waste Management Program To establish proper procedures for the management of the solid waste generated during the installation and operation of the mine, by reducing the generation, handling, packaging, storage, transportation, treatment, and final disposal of the same, in accordance with current regulations.
Reuse of tailings program The objective of this report is to describe the feasibility of the use of the tailings/waste generated by the process of exploitation of pegmatite of the Sigma mining venture.
Environmental Education Program – EEP The EEP has the general aim of mobilizing and raising the awareness of employees and the community located in the Area of Indirect Influence (AII) of the venture, regarding the importance of environmental conservation, through activities that seek to raise awareness of the topics addressed.
Program of prioritization and professional training of human resources and local suppliers Create strategies of human resource training to provide opportunities for growth and development for the internal workers of the company and the region through courses focused on the importance of the enterprise, in partnership with the public and private educational institutions of the region.
Accident prevention and public health program Adopt measures to ensure the integrity, health, and safety of employees, as well as comply with Regulatory Standard NR-22, which establishes obligations upon employers to coordinate, establish and implement measures of employee safety and health.
Social communication program To promote practices of social and environmental responsibility, based on ethics and the transparency of information related to the enterprise. Develop continuous and transparent communication between the company, the local community, and inspection agencies.
PPA and Legal Reserve maintenance program To guarantee the conservation of the Permanent Preservation Areas (PPA) and Legal Reserve (LR) and provide compensation to avoid the loss of flora species, mainly aquatic macrophytes, to sow propagules, to protect the water body, and to care for fauna by offering suitable areas for their survival.
Program for the rescue and prevention of flight of local wildlife The Fauna Rescue Program aims to avoid the mortality of the fauna and allow animals to continue occupying the region, as well as to contribute to the scientific research into the fauna during the removal of the vegetation by the mining project.

 

20.8.8Relationship with Interested Parties

 

Sigma maintains a harmonious relationship with the communities and town halls within the project area. The company, therefore, structures its community relations activities to consider the concerns of the local population and strives to communicate and demonstrate its commitment in a way that it can be better appreciated and understood to maintain the social license for operation.

21501-REP-PM-001
Page | 412

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

  

Sigma has identified and continues to consult/commit to various stakeholders in support of project development, which include the following:

 

·Communities

·Intinga and Araçuaí Town Halls

·Religious leaders in Itinga and Araçuaí

·UNIP University and youth leaders from Araçuaí

·Regional City Council meeting with the general public and merchants

·Consultations with local communities in Barreiro

·Araçuaí and Itinga Town Halls

·Regulatory and government institutions

·National Mining Agency (ANM) in Brasília and Belo Horizonte

·State Environmental Agency (Suppri and Supram) in Belo Horizonte

·INDI - Minas Gerais Investment and Foreign Trade Promotion Agency

 

20.8.9Rehabilitation and Closure Planning

 

The mine closure term provides for the definitive cessation of mining operations when project decommissioning takes place, i.e., when project areas are released followed by their recovery and adaptation for other purposes or uses.

 

Therefore, ANM will be notified in advance before closure, and closure will only take place after authorization from the respective agency. After prior notice, a justification application will be submitted to the Minister of Mines and Energy, duly accompanied by the following supporting documents:

 

i.  Report of the work carried out;

ii.  Characterization of remaining reserves;

iii.  Demobilization plan for the facilities and equipment that make up the infrastructure of the mining project, indicating the destination of each item;

iv.  Update of all topographic surveys of the mine;

v.  Mine plan with mined areas recovered, impacted areas recovered and to be recovered, areas for disposal of organic soil, waste heaps, ore, and tailings, disposal systems, access roads, and other construction works;

vi.  Follow-up and monitoring program related to:

·Disposal and containment systems;

·Slopes in general;

·Water table behavior and

·Water drainage

vii.  Control plan for soil, air, and water pollution, with a description of controlling parameters;

viii.  Effluent release control plan with a description of controlling parameters;

ix.  Measures to prevent outsiders from accessing the mine and preventing access to dangerous areas;

x.  Definition of environmental impacts in the project’s areas of influence, taking into account the physical, biotic, and anthropic environments;

xi.  Fit for purpose and intention of use of the area in the future;

xii.  Topographic and landscape conformation taking into account aspects of stability, erosion control, and drainage;

xiii.  Report on the occupational health conditions of workers during the useful life of the mining project; and

xiv.  Schedule of the proposed activities, including financially.

21501-REP-PM-001
Page | 413

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

  

Decommissioning or closure is understood as project activities or part of project activities coming to an end, with the application of appropriate and recognized techniques and approval by competent agencies, in such a way that the company does not have any liabilities.

 

Thus, the closure or decommissioning program of the intended project will be designed so that the following general and specific objectives are achieved.

 

It is important to emphasize that this study concerns a Preliminary License and an Installation License for the project in question. Therefore, the Mine Closure Plan will be submitted and detailed during project operation licensing.

21501-REP-PM-001
Page | 414

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

21Capital and Operating Costs – Xuxa (Phase 1) and Barreiro (Phase 2)

 

21.1Basis of Estimate

 

The capital cost estimate (CAPEX) and operating cost estimate (OPEX) were developed to provide substantiated costs for the FEED study of Xuxa and the PFS of Barreiro processing plant and to provide Sigma with an overall risk and opportunity profile to enable a Phase 1 production decision and to advance off-take agreements and project financing.

 

The Xuxa plant estimate parameters used for this estimation is from the FEED study completed in 4Q21.

 

The Barreiro plant estimate parameters used for this estimation are as follows:

 

·Estimate accuracy plant capital costs: +25% / -25%

·Estimate accuracy infrastructure capital costs: +25% / -25%

·Estimate accuracy operating costs: +25% / -25%

·Estimate period: 4Q21

·Estimate currency: US$

 

21.2Work Breakdown Structure

 

The following first level work breakdown structure was used for the Xuxa and Barreiro concentrators. It is based on the recent Xuxa FEED study following WBS structure:

 

·001 – Mine

·002 – Plant

·003 – Environment

·004 – EPCM & Engineering Services

·005 – Substation & Utility Power Supply

·006 – Owners Project Costs

·007 – Working Capital and Spares

·008 – Sustaining and Deferred Capital

 

21.3Estimate Plan

 

21.3.1Xuxa Plant (Phase 1)

 

For the XUXA plant, the CAPEX estimates were performed by the following firms:

 

·GE21: Mining

 

·Primero: Crushing Circuit and DMS wet plant (with the related material take-offs for concrete, steel, platework, piping, and electrical bulks)

 

·Promon: Infrastructure (e.g., Infrastructure, Power Supply, Water Supply, Buildings, etc. and all Bulk Earthworks for the entire site, roads and site water run-off catchment)

 

21.3.2Barreiro Plant (Phase 2)

 

For the CAPEX and OPEX estimation of the Barreiro plant, Primero used as a strong basis, the FEED study results for the Xuxa plant (Phase 1). Process design criteria was developed to take into consideration the various test work results associated to the Barreiro ore characteristics. The mineral recovery methods evaluated and proposed for the Xuxa plant was determined to be suitable for the Barreiro plant. With the main production target criteria consisting of yielding 220k tonnes of spodumene concentrate per annum, the Xuxa FEED CAPEX was updated as outlined below to account for the updated Xuxa FEED design that was progressed at the time.

21501-REP-PM-001
Page | 415

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Scope (upgrades from the Xuxa FEED)

 

·Contract Crushing replaced with 3 stage fixed crushing facility to handle 1000 mm ROM top size

 

·Throughput increased from 1,5 Mtpa to 1.80 Mtpa

 

·Ore sorting removed

 

·Thickener pricing reduced allowing for a 25 m thickener for Barriero

 

·Dedicated Barreiro Belt Filter increased from 7 m2 to 22 m2

 

·All common facilities (Site infrastructure, HV Power supply, water supply/storage, compressed air supply, fire water system etc.) excluded. Assumed that this will be included in Xuxa CAPEX and be suitably sized for Barreiro Phase 2.

 

·Secondary Ultrafines DMS circuit included

 

In-Directs

 

·FX rates updated – average for the six-month period (Q3 and Q4 2021)

 

·Contractor in-directs removed and included within installation labour rates

 

·Costs associated with contract crushing removed

 

·EPCM Cost for Process Plant: Priced based on 18% of process plant direct costs. Includes fixed plant crushing

 

·Temporary construction facilities removed

 

·Additional spares allowance included for fixed plant crushing/screening plant, assessed as 100% of Xuxa FEED CAPEX allowance

 

·Commissioning included for Fixed plant crushing and screening circuit. Commissioning durations reduced compared to Xuxa assuming synergies

 

Directs – Bulks

 

·The Xuxa FEED CAPEX was used as the basis and as such, all bulk quantities relevant to the Barreiro scope are as per the quantities included in the Xuxa FEED estimate with the following adjustments to account for the differences in scope between Xuxa and Barreiro.

 

oNon-Process Infrastructure and common infrastructure: Quantities removed (0% of Xuxa)

 

oProcess Plant: Quantities retained (100% of Xuxa)

 

oSitewide Drainage: Assessed as 50% of Xuxa quantities

 

Directs – Equipment

 

·The Xuxa FEED CAPEX was used as the basis and as such, all direct costs relevant to the Barreiro scope are as per the costs included in the Xuxa FEED estimate with the following adjustments to account for the difference s in scope between Xuxa and Barreiro Phases.

 

oAll common facilities such as truck weigh station, buildings, NPI, roads: Quantities removed (0% of Xuxa)

 

oPlant & Pre-production: 50% of Xuxa allowance

 

oCompressed air: 25% of Xuxa allowance

 

oFencing: 50% of Xuxa allowance

21501-REP-PM-001
Page | 416

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

oProcess water: Retained process pumps, reduced water storage (assessed as 30% of Xuxa allowance)

 

oWater treatment: 50% of Xuxa allowance

 

oSewerage treatment: Quantities removed (0% of Xuxa)

 

oTails handling: Retained infrastructure quantities however assessed Tails Thickener as 70% of Xuxa allowance (to allow an additional, however smaller, thickener), 60% of feed box allowance

 

oSewerage and Water treatment: Quantities removed

 

oHV Switchyard and transmission line: Quantities removed

 

oAll other process equipment quantities and allowances have been retained at 100% of Xuxa

 

Directs – Piping

 

·The Xuxa FEED CAPEX was used as the basis and as such, all direct costs relevant to the Barreiro scope are as per the costs included in the Xuxa FEED estimate with the following adjustments to account for the difference s in scope between Xuxa and Barreiro.

 

oPipe racks: Quantities doubled (200% of Xuxa)

 

oProcess piping: Retained as per Xuxa quantities

 

oCompressed air: Assessed as 25% of Xuxa

 

oProcess Water: Quantities removed

 

oFire Water: Quantities removed

 

oWater intake: Quantities removed

 

21.3.3Currency Conversion

 

The CAPEX is presented in United States Dollars (USD). All costs have been expressed in their native currency and converted to USD currency as per the following yearly average exchange rates:

 

Table 21-1 – Quoted Currency Exchange Rates

 

Code Description Rate
US$ US Dollars 1.000
EUR Euro 0.832
AUD Australian Dollars 1.302
BRL Brazilian Real 5.30
CAD Canadian Dollars 1.25

 

21.4Capital Cost

 

21.4.1Capital Cost Estimate

 

A summary of the capital cost estimate for the Xuxa concentrator and the site infrastructure are shown in Table 21-2. The summary of the capital cost estimate for the Barreiro concentrator is presented in Table 21-3.

21501-REP-PM-001
Page | 417

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 21-2 – Xuxa Concentrator Capital Cost Estimate Summary

 

AREA TOTALS
  (USD)
  DIRECTS + INDIRECTS CONTINGENCY TOTAL
  (USD) (USD) (USD)
001 MINE  7,856,938  604,984  8,461,922
001.001 Mine general  6,168,390  474,966  6,643,356
001.001.700 Mine pre-stripping  –  –  –
001.001.730 Mining Pre-Production  6,168,390  474,966  6,643,356
001.001.770 Mine Mobile Equipment - LME  –  –  –
001.001.780 FUELS & LUBRICANTS  –  –  –
001.002 Mine infrastructure general  1,688,548  130,018  1,818,566
001.002.635 Bridge  458,228  35,284  493,512
001.002.720 Mine Establishment  –  –  –
001.002.750 Mining Infrastructure & Services  1,230,320  94,735  1,325,055
002 PLANT  64,841,255  4,992,777  69,834,032
002.001 Crushing system - Primary/Secondary/ Scalping  21,799,701  1,678,577  23,478,278
002.001.210 General Crushing  6,488,886  499,644  6,988,530
002.001.211 Primary Crushing  4,596,466  353,928  4,950,393
002.001.212 Secondary Crushing  1,241,152  95,569  1,336,721
002.001.215 Scalping Screening  1,400,181  107,814  1,507,995
002.001.223 Classification Screening  1,040,080  80,086  1,120,167
002.001.224 Ore Sorting  –  –  –
002.001.225 Tertiary Crushing  3,346,887  257,710  3,604,597
002.001.227 Crushed Ore Storage & Reclaim  3,686,048  283,826  3,969,873
002.001.229 Waste  –  –  –
002.002 DMS System  21,654,142  1,667,369  23,321,511
002.002.030 Vendor Representatives  118,000  9,086  127,086
002.002.310 General DMS  2,432,499  187,302  2,619,801
002.002.311 DMS Sizing Screen  3,283,690  252,844  3,536,534
002.002.312 Primary DMS  2,917,697  224,663  3,142,359
002.002.313 Secondary DMS  3,684,882  283,736  3,968,618
002.002.314 Primary Ultrafines DMS  2,269,313  174,737  2,444,050
002.002.315 Secondary Ultrafines DMS  1,483,006  114,191  1,597,198
002.002.325 Ultrafines DMS Product Stockpile  161,775  12,457  174,231
002.002.331 FeSi  61,985  4,773  66,758
002.002.332 FeSi - Secondary  –  –  –
002.002.333 FeSi - Ultrafine  –  –  –
002.002.335 Flocculant  465,334  35,831  501,165
002.002.340 Coarse & Fines DMS Product Stockpile  920,012  70,841  990,853
002.002.345 Truck Weigh Station  167,306  12,883  180,189
002.002.350 Tails Handling  –  –  –
002.002.351 Screw Classifier  649,760  50,032  699,792
002.002.352 Thickening  –  –  –
002.002.353 Filtration  –  –  –
002.002.354 Tails Deposition (Dry Stack)  –  –  –
002.002.820 Plant & Pre-Production  3,038,883  233,994  3,272,877
002.002.841 Commissioning  –  –  –
002.003 AUTOMATION/DIGITALIZATION  3,852,981  296,680  4,149,661
002.003.100 Plant Control Systems  1,177,532  90,670  1,268,202
002.003.210 Automation in General Crushing  9,741  750  10,491

21501-REP-PM-001
Page | 418

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

002.003.211 Automation in Primary Crushing  9,154  705  9,859
002.003.310 Automation in DMS area  25,443  1,959  27,402
002.003.311 Automation in DMS Sizing Screen  15,647  1,205  16,852
002.003.312 Automation in Primary DMS  –  –  –
002.003.313 Automation in Secondary DMS  12,932  996  13,928
002.003.314 Automation in Primary Ultrafines DMS  791,659  60,958  852,616
002.003.315 Automation in Secondary Ultrafines DMS  101,992  7,853  109,845
002.003.350 DMS automation  101,992  7,853  109,845
002.003.630 General automation  1,606,891  123,731  1,730,621
002.004 INFRASTRUCTURE  17,534,431  1,350,151  18,884,582
002.004.111 Pipe Racks  104,619  8,056  112,674
002.004.115 Bulk Site Earthworks  4,096,943  315,465  4,412,407
002.004.370 Process Plant Services  –  –  –
002.004.371 Compressed Air  396,335  30,518  426,853
002.004.372 Maintenance/Workshops  619,353  47,690  667,043
002.004.373 Warehouse Stores  453,123  34,890  488,014
002.004.380 Process Water  –  –  –
002.004.381 Gland Water  63,287  4,873  68,161
002.004.600 Infrastructure  –  –  –
002.004.625 Stormwater Drainage System  1,503,732  115,787  1,619,520
002.004.627 Fire Water System  102,999  7,931  110,930
002.004.628 Water intake  771,557  59,410  830,967
002.004.630 Infrastructure – General  5,556,353  427,839  5,984,193
002.004.631 Public Roads  732,881  56,432  789,313
002.004.632 Carparks/Hardstand, Roads  493,096  37,968  531,064
002.004.634 Fencing  511,199  39,362  550,561
002.004.639 Central Waste  137,619  10,597  148,215
002.004.660 Buildings - Admin  313,309  24,125  337,434
002.004.661 Canteen  335,363  25,823  361,186
002.004.662 Clinic  210,770  16,229  226,999
002.004.663 Laboratory  911,910  70,217  982,127
002.004.665 Gatehouse  189,635  14,602  204,237
002.004.670 Non-process Electrical Services  –  –  –
002.004.673 Plant Security System  –  –  –
002.004.675 Fire Detection and Protection  –  –  –
002.004.676 Communications & Network  30,347  2,337  32,683
002.004.680 Fuel Storage & Distribution  –  –  –
002.004.811 Owners Temporary Infrastructure  –  –  –
003 ENVIRONMENTAL  15,387,006  1,184,799  16,571,805
003.001 WATER RECYCLING  3,326,211  256,118  3,582,329
003.001.641 Environmental Procces Water  2,168,799  166,998  2,335,796
003.001.623 Water Treatment  968,513  74,576  1,043,089
003.001.624 Sewage Collection & Treatment  188,899  14,545  203,445
003.002 TAILINGS DRY STACKING  9,792,436  754,018  10,546,454
003.002.352 Environmental Thickener  667,396  51,390  718,786
003.002.353 Environmental filtration  372,730  28,700  401,431
003.002.354 Environmental Deposition  523,536  40,312  563,848
003.002.350 Environmental Tails handling  8,228,774  633,616  8,862,389
003.003 SEWAGE & WATER TREATMENT  2,268,358  174,664  2,443,022
003.003.620 Water & Sewage  779,134  59,993  839,127
003.003.621 Raw Water Supply  1,259,928  97,014  1,356,942
003.003.622 Potable Water Supply  229,297  17,656  246,953

21501-REP-PM-001
Page | 419

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

004 EPCM & ENGINEERING SERVICES  17,867,543  1,375,801  19,243,344
004.001 Management  17,867,543  1,375,801  19,243,344
004.001.010 EPCM  13,467,417  1,036,991  14,504,408
004.001.030 Subconsultants  84,480  6,505  90,985
004.001.050 Construction Indirects – Contractors  2,613,730  201,257  2,814,988
004.001.060 Site Construction Facilities  426,710  32,857  459,566
004.001.080 Construction Operations  –  –  –
002.001.841 Commissioning  1,275,206  98,191  1,373,397
005 SUBSTATION & UTILITY POWER SUPPLY  6,888,863  530,442  7,419,305
005.001 SUBSTATION SYSTEM  6,888,863  530,442  7,419,305
005.001.652 HV Switchyard/Substation  5,781,316  445,161  6,226,477
005.001.650 Utility Power Supply  –  –  –
005.001.651 Transmission Line  1,107,547  85,281  1,192,828
Total Construction Capital Cost  112,841,604  8,688,804  121,530,408
006 OWNERS PROJECT COSTS  8,901,677  890,168  9,791,844
006.001 GENERAL  8,901,677  890,168  9,791,844
006.001.810 Owners Project Costs  8,901,677  890,168  9,791,844
007.001.811 Owners Temporary Infrastructure  –  –  –
006.001.815 Training  –  –  –
006.001.818 Policies & Procedures  –  –  –
006.001.824 First Fill Reagents & Consumable  –  –  –
006.001.825 Fuels & Lubricants  –  –  –
006.001.827 Small Tools & Maintenance Equipment  –  –  –
006.001.842 Operating Spares  –  –  –
006.001.843 Insurance Spares  –  –  –
006.001.850 Fees / Taxes / Duties  –  –  –
006.001.860 Community  –  –  –
006.001.870 Plant Mobile Equipment  –  –  –
006.001.880 Safety  –  –  –
007.001 Working Capital and Spares  6,137,293  –  6,137,293
007.001 Working Capital  5,200,000  –  5,200,000
007.002 Spare Parts  937,293  –  937,293
Total Construction Capital Cost (ex VAT Tax Incentive)  127,880,574  9,578,971  137,459,545
009.001 Estimated VAT Tax Incentive (5,859,000)  – (5,859,000)
Total Construction Capital Cost  122,021,574  9,578,971  131,600,545
       
008 Sustaining and Deferred Capital 3,200,000 246,400  3,446,400
008.001 GENERAL 3,200,000 246,400  3,446,400
008.001.910 Mine / Plant / Other  –  –  –
008.001.920 Mine / Plant / Tailings Dam/ Other  3,000,000  231,000  3,231,000
008.001.930 Mine/Plant/Waste rock & Tailings disposal  200,000  15,400  215,400

21501-REP-PM-001
Page | 420

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

The total Capex for Xuxa is US$137.4 M (this is including the Owner’s cost, working capital, contingency and excluding the Sustaining Capital and the Estimated Vat Tax Incentive). The Vat Tax Incentive estimated amount is US$5.9 M.

 

The total Capex for Xuxa including the Estimated Vat Tax Incentive is US$131.6 M. The total capex already disbursed during construction is US$20,700,000 with US$ 110,900,545 of capex remining.

 

Sustaining capital is estimated at US$3.2 M (including contingency) for replacement of key plant components over the 8-year Phase 1 Mine life, considering the modelled operating life and useful life of major equipment items. The sustaining capex is mainly for the crushing area and allows for crusher rebuilds (replacements).

 

Table 21-3 Barreiro Concentrator Capital Cost Estimate Summary

 

AREA TOTALS
(USD)
PROCESSING PLANT DIRECTS + INDIRECTS CONTINGENCY TOTAL
(USD) (USD) (USD)
     
001 MINE  2,096,208  161,408  2,257,616
001.001 Mine general  –  –  –
001.001.700 Mine pre-stripping  –  –  –
001.001.730 Mining Pre-Production  –  –  –
001.001.770 Mine Mobile Equipment - LME  –  –  –
001.001.780 FUELS & LUBRICANTS  –  –  –
001.002 Mine infrastructure general  2,096,208  161,408  2,257,616
001.002.635 Bridge  –  –  –
001.002.720 Mine Establishment  –  –  –
001.002.750 Mining Infrastructure & Services  2,096,208  161,408  2,257,616
002 PLANT  50,056,062  3,854,317  53,910,379
002.001 Crushing system - Primary/Secondary/ Scalping  21,799,701  1,678,577  23,478,278
002.001.210 General Crushing  6,488,886  499,644  6,988,530
002.001.211 Primary Crushing  4,596,466  353,928  4,950,393
002.001.212 Secondary Crushing  1,241,152  95,569  1,336,721
002.001.215 Scalping Screening  1,400,181  107,814  1,507,995
002.001.223 Classification Screening  1,040,080  80,086  1,120,167
002.001.224 Ore Sorting  –  –  –
002.001.225 Tertiary Crushing  3,346,887  257,710  3,604,597
002.001.227 Crushed Ore Storage & Reclaim  3,686,048  283,826  3,969,873
002.001.229 Waste  –  –  –
002.002 DMS System  20,264,838  1,560,393  21,825,231
002.002.030 Vendor Representatives  236,000  18,172  254,172
002.002.310 General DMS  2,575,749  198,333  2,774,082
002.002.311 DMS Sizing Screen  3,312,685  255,077  3,567,762
002.002.312 Primary DMS  2,917,697  224,663  3,142,359
002.002.313 Secondary DMS  3,684,882  283,736  3,968,618
002.002.314 Primary Ultrafines DMS  2,276,511  175,291  2,451,802
002.002.315 Secondary Ultrafines DMS  1,483,006  114,191  1,597,198
002.002.325 Ultrafines DMS Product Stockpile  161,775  12,457  174,231
002.002.331 FeSi  61,985  4,773  66,758
002.002.332 FeSi - Secondary  –  –  –
002.002.333 FeSi - Ultrafine  –  –  –
002.002.335 Flocculant  465,334  35,831  501,165

21501-REP-PM-001
Page | 421

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

002.002.340 Coarse & Fines DMS Product Stockpile  920,012  70,841  990,853
002.002.345 Truck Weigh Station  –  –  –
002.002.350 Tails Handling  –  –  –
002.002.351 Screw Classifier  649,760  50,032  699,792
002.002.352 Thickening  –  –  –
002.002.353 Filtration  –  –  –
002.002.354 Tails Deposition (Dry Stack)  –  –  –
002.002.820 Plant & Pre-Production  1,519,442  116,997  1,636,439
002.002.841 Commissioning  –  –  –
002.003 AUTOMATION/DIGITALIZATION  3,852,981  296,680  4,149,661
002.003.100 Plant Control Systems  1,177,532  90,670  1,268,202
002.003.210 Automation in General Crushing  9,741  750  10,491
002.003.211 Automation in Primary Crushing  9,154  705  9,859
002.003.310 Automation in DMS area  25,443  1,959  27,402
002.003.311 Automation in DMS Sizing Screen  15,647  1,205  16,852
002.003.312 Automation in Primary DMS  –  –  –
002.003.313 Automation in Secondary DMS  12,932  996  13,928
002.003.314 Automation in Primary Ultrafines DMS  791,659  60,958  852,616
002.003.315 Automation in Secondary Ultrafines DMS  101,992  7,853  109,845
002.003.350 DMS automation  101,992  7,853  109,845
002.003.630 General automation  1,606,891  123,731  1,730,621
002.004 INFRASTRUCTURE  4,138,542  318,668  4,457,210
002.004.111 Pipe Racks  209,238  16,111  225,349
002.004.115 Bulk Site Earthworks  2,426,457  186,837  2,613,295
002.004.370 Process Plant Services  –  –  –
002.004.371 Compressed Air  99,521  7,663  107,184
002.004.372 Maintenance/Workshops  –  –  –
002.004.373 Warehouse Stores  –  –  –
002.004.380 Process Water  –  –  –
002.004.381 Gland Water  63,287  4,873  68,161
002.004.600 Infrastructure  –  –  –
002.004.625 Stormwater Drainage System  1,054,093  81,165  1,135,258
002.004.627 Fire Water System  –  –  –
002.004.628 Water intake  –  –  –
002.004.630 Infrastructure – General  –  –  –
002.004.631 Public Roads  –  –  –
002.004.632 Carparks/Hardstand, Roads  –  –  –
002.004.634 Fencing  255,600  19,681  275,281
002.004.639 Central Waste  –  –  –
002.004.660 Buildings - Admin  –  –  –
002.004.661 Canteen  –  –  –
002.004.662 Clinic  –  –  –
002.004.663 Laboratory  –  –  –
002.004.665 Gatehouse  –  –  –
002.004.670 Non-process Electrical Services  –  –  –
002.004.673 Plant Security System  –  –  –
002.004.675 Fire Detection and Protection  –  –  –
002.004.676 Communications & Network  30,347  2,337  32,683
002.004.680 Fuel Storage & Distribution  –  –  –
002.004.811 Owners Temporary Infrastructure  –  –  –
003 ENVIRONMENTAL  6,747,201  519,534  7,266,735
003.001 WATER RECYCLING  1,331,505  102,526  1,434,031

21501-REP-PM-001
Page | 422

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

003.001.641 Environmental Procces Water  847,248  65,238  912,486
003.001.623 Water Treatment  484,257  37,288  521,544
003.001.624 Sewage Collection & Treatment  –  –  –
003.002 TAILINGS DRY STACKING  5,415,696  417,009  5,832,705
003.002.352 Environmental Thickener  –  –  –
003.002.353 Environmental filtration  –  –  –
003.002.354 Environmental Deposition  –  –  –
003.002.350 Environmental Tails handling  5,415,696  417,009  5,832,705
003.003 SEWAGE & WATER TREATMENT  –  –  –
003.003.620 Water & Sewage  –  –  –
003.003.621 Raw Water Supply  –  –  –
003.003.622 Potable Water Supply  –  –  –
004 EPCM & ENGINEERING SERVICES  10,726,444  825,936  11,552,380
004.001 Management  10,726,444  825,936  11,552,380
004.001.010 EPCM  8,753,821  674,044  9,427,865
004.001.030 Subconsultants  25,344  1,951  27,295
004.001.050 Construction Indirects – Contractors  470,471  36,226  506,698
004.001.060 Site Construction Facilities  76,808  5,914  82,722
004.001.080 Construction Operations  –  –  –
004.001.841 Commissioning  1,400,000  107,800  1,507,800
005 SUBSTATION & UTILITY POWER SUPPLY  –  –  –
005.001 SUBSTATION SYSTEM  –  –  –
005.001.652 HV Switchyard/Substation  –  –  –
005.001.650 Utility Power Supply  –  –  –
005.001.651 Transmission Line  –  –  –
006 OWNERS PROJECT COSTS  3,000,000  231,000  3,231,000
006.001 GENERAL  3,000,000  231,000  3,231,000
006.001.810 Owners Project Costs  3,000,000  231,000  3,231,000
007.001.811 Owners Temporary Infrastructure  –  –  –
006.001.815 Training  –  –  –
006.001.818 Policies & Procedures  –  –  –
006.001.824 First Fill Reagents & Consumable  –  –  –
006.001.825 Fuels & Lubricants  –  –  –
006.001.827 Small Tools & Maintenance Equipment  –  –  –
006.001.830 Admin Pre-Production Other  –  –  –
006.001.840 Spare Parts  –  –  –
006.001.842 Operating Spares  –  –  –
006.001.843 Insurance Spares  –  –  –
006.001.850 Fees / Taxes / Duties  –  –  –
006.001.860 Community  –  –  –
006.001.870 Plant Mobile Equipment  –  –  –
006.001.880 Safety  –  –  –
007 Working Capital and Spares  937,293  72,172  1,009,465
007.001 GENERAL  937,293  72,172  1,009,465
007.001.830 Working Capital  –  –  –
007.001.840 Spare Parts  937,293  72,172  1,009,465
007.001.920 Deferred Capital  –  –  –
Total Construction Capital Cost (VAT Tax Incentive)  73,563,208  5,664,367  79,227,575
008.001 Estimated VAT Tax Incentive (3,500,000)  – (3,500,000)
Total Construction Capital Cost (VAT Tax Incentive)  70,063,208  5,664,367  75,727,575
       
008 Sustaining and Deferred Capital  7,070,000  544,390  7,614,390
008.001 GENERAL  7,070,000  544,390  7,614,390
008.001.910 Sustaining Capital  6,000,000  462,000  6,462,000
008.001.930 Closure Cost  1,070,000  82,390  1,152,390

21501-REP-PM-001
Page | 423

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

The total Capex for Barreiro is US$79.2 M (this is including the Owner’s cost, working capital, contigency and excluding the Sustaining Capital and the Estimated Vat Tax Incentive). The Vat Tax Incentive estimated amount is US$3.5 M.

 

The total Capex for Barreiro including the Estimated Vat Tax Incentive is US$75.7 M.

 

It is worth noting that the cost amount of the common concentrators Infrastructure (002.004), tailings dry stacking (003.002), EPCM & Engineering Services (004), substation & utility Power Supply (005), Owner’s project costs (006), has been accounted for in the Xuxa concentrator Capex estimate, and thus explaining most of the cost differences between the two plants.

 

Sustaining Capital includes a provision of US$3.2 M every 5 years (for a total of US$6.4 M over the duration of the mine life) to account for key plant components to be replaced to sustain existing production. Additional US$1.2M of mine closure costs were included at the end of the mine life.

 

21.4.2Summary of Key Quantities

 

A summary of the key construction material quantities for the process plants are presented in Table 21-4.

 

Table 21-4: Process Plant Material Quantity Summary

 

Type Unit Xuxa Concentrator Total Barreiro Concentrator Total
Steelwork t 782 872
Platework t 514 432
Concrete 4,176 3,554
Cable m 52,630 47,540
Equipment num 204 207

 

21.4.3Basis of Process Plant Estimate

 

21.4.3.1Summary Table

 

The process plant capital cost for Xuxa and Barreiro estimate was assembled in accordance with Table 21-5.

21501-REP-PM-001
Page | 424

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 21-5: Capital Cost Estimate Basis – Process Plant

 

Description Responsible Data
Requirement
CAPITAL COST ESTIMATE
Direct Costs
Supply and fabrication Primero Quoted (for equipment, structural steel and platework)
Firm quotes for long lead equipment (six). Multiple budget quotes including for electrical equipment and instrumentation.
Installation Promon / Primero

Quoted (equipment, platework and structural steel)

Unit rates from Promon budgetary pricing or in-house data RFQs based on Primero MTOs and equipment list.

Bulks supply and installation Promon / Primero

Quoted (for concrete and electrical supply & installation)
Unit rates obtained from budgetary pricing RFQs based on Primero MTOs.

Piping supply and installation factored form similar projects for process plant.

Civil Promon / Promon Primero

Quoted

Unit rates obtained from budgetary pricing RFQs.

Process Infrastructure Primero Provided from Primero
Freight Primero Calculated Pricing obtained from major procurement locations to site.
Commissioning Primero Calculated Built up from historic data

21501-REP-PM-001
Page | 425

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Description Responsible Data
Requirement
Indirect Costs
Indirect labour rates Promon / Primero Quoted
Multiple quotes
Engineering Primero Calculated
Detailed deliverables list and hours estimate
Offsite and site management Primero Calculated
Built up by resource from detailed project schedule
Temporary facilities Promon / Primero

Calculated/Quoted
Duration build up from detailed project schedule for EPCM and Client facilities.

Contractor’s facilities quoted

Construction plant Promon / Primero Quoted
Contractor plant included in quotes
Contingency Primero Calculated
Assessed on supply and installation separately. Compared against detailed risk analysis.
Foreign exchange Primero Calculated Estimate built in US$ based on currency applied conversion rates (Table 21-1)
Escalation Primero  (1.25% for the piping)
Owner’s costs Sigma Information provided by Sigma
Training Primero Estimated
First fills and consumables Primero Calculated
Spares Primero Calculated
Sustaining Capital Sigma Information provided by Sigma
Taxes Sigma Estimated Refer to section 21.4.4.1 for tax rates applied
Import duties N/A Not included

21501-REP-PM-001
Page | 426

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

As a basis for the CAPEX build-up, engineering and design were advanced to a FEED level for the Xuxa plant and a pre-feasibility level for the Barreiro plant with approval of key deliverables obtained from Sigma. These included the design basis, process design criteria, block flow diagram, process flow diagram, a high-level mass balance basis of design along with a similar project execution plan, schedule and site conditions as Xuxa Phase 1 FEED.

 

21.4.3.2Estimate Area Facility and Commodity Coding

 

The estimate was developed based on the Xuxa project WBS structure and Promon’s coding structure.

 

21.4.3.3Contingency

 

Contingencies do not include allowances for scope changes, escalation, or exchange rate fluctuations. Specific items were covered by allowances and not by contingency. Contingency was assigned to each estimate line item and is based on the inputs in Table 21-6.

 

Table 21-6 – Contingency Requirements

 

Category Contingency
SCOPE CATEGORY – Contingent sum attributed to quantities and scale
Detailed take-off from detailed design drawings, detailed model and lists 7.5%
General take off from sketches, plot plans, general model, general arrangement drawings, process and instrumentation diagrams and single line diagrams 10%
Estimated from plot plans, GA’s and previous experience 12.5%
Factored from previous projects / ratios 20%
Allowance 25%
SUPPLY COST – Contingent sum attributed to supply and freight costs
Awarded contract, purchase order and fixed price quotation 5%
Budget quotation 10%

21501-REP-PM-001
Page | 427

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Category Contingency
In-house database 12.5%
Estimated value 15%
Factored value 20%
Allowance 25%
INSTALLATION COST – Contingent sum attributed to installation costs
Awarded contract, purchase order and fixed price quotation 5%
Budget quotation 10%
In-house database 12.5%
Estimated value 15%
Factored value 20%
Allowance 25%

 

Contingency was calculated for each estimate line item according to the above categorisation based on the following formula:

 

[A] = [0.4B + 0.4C + 0.2D]

 

Where:

 

[A] = Contingency %

[B] = Scope Category %

[C] = Supply Cost Category %

[D] = Installation Cost Category %

 

21.4.3.4Tax

 

21.4.3.4.1Taxation

 

Recoverable taxes were considered in the cost estimation. The basis of these exemptions is that Sigma may benefit from the Federal special tax regime of acquisition of capital goods by Brazilian exporters (RECAP regime).

 

To qualify for the RECAP regime, the project needs to meet the requirements as stated in the RECAP regime. Currently, Sigma at the time of this report was not in a position to attest whether the company complies or would be able to comply with all the legal requirements in order to be granted the regime by the Federal Revenue Service.

 

Sigma may also benefit from the Federal tax incentive applicable to companies headquartered in the Northeast region of Brazil (SUDENE incentive) whereby Sigma applies for the tax incentive consisting of a fixed reduction of 75% of the corporate income tax calculated based on the so-called “exploitation profit’. An application has been filed by Sigma with SUDENE. Sigma will need to obtain a Constitutive Report by submitting a new request once the Xuxa project is fully implemented and the project has fully achieved its 20% capacity.

21501-REP-PM-001
Page | 428

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

The estimate was built on a cost basis excluding taxes. Taxes were then applied as per Table 21-7.

 

Table 21-7 – Summary of Tax applied to the CAPEX

 

Description Supply Install
Tax Applicable ICMS PIS/COFINS ISS PIS/COFINS
Mechanical 12.00% 9.25% 5.00% 4.65%
Concrete 0.00% 0.00% 3.00% 3.65%
Platework 12.00% 9.25% 5.00% 4.65%
Structural 12.00% 9.25% 5.00% 4.65%
E&I 12.00% 9.25% 5.00% 4.65%
Indirects 12.00% 9.25% 5.00% 3.65%

 

As agreed with Sigma, the VAT tax (Imposto sobre Circulação de Mercadorias e Serviços (ICMS)), and federal taxes on gross revenues (PIS/COFINS) are assumed to be recoverable taxes. The project is expected to benefit from RECAP (IN SRF 605/2006 – a special tax regime for fixed assets acquisition for exporting companies) which grants PIS (Social Integration Program) and COFINS (Social Security Contribution) exemptions on federal sales taxes charged on gross revenues. City tax on services (Imposto Sobre Serviços (ISS)) is assumed to be not recoverable.

 

Law 13.137/15 increased the standard PIS and COFINS rates levied on the import of goods, from a combined rate of 9.25% (1.65% PIS and 7.6% COFINS) to 11.75% (2.1% PIS and 9.65% COFINS). According to Law 13.137/15, taxpayers are allowed to recognize PIS and COFINS input credits based on the increased rates (under the non-cumulative regime). Other sectors that were already subject to increased PIS and COFINS rates for imports under special regimes (such as cosmetics, machinery, pharmaceuticals and tires) are now subject to combined rates as high as 20%, depending on the harmonized code for the products. The PIS and COFINS rates on imported services remains unchanged (i.e., combined rate of 9.25%).

 

PIS/COFINS can be 100% exempt for exporting companies under a Tax Benefit ruled by Normative Instruction from the Federal Revenue (Instrução Normativa SRF) number 605, called RECAP.

 

RECAP exemption applies to:

 

·PIS/COFINS over gross revenue over fixed assets goods sold to a client who has applied to RECAP

·PIS/COFINS over importation of fixed assets for a company that who has applied to RECAP

 

21.4.3.5Estimate Clarifications and Exclusions

 

The estimate was based on the Xuxa Phase 1 DFS Project Execution and Contracting Plan as defined in Section 24 and deemed suitable to be used for the similar Barreiro plant. Table 21-5 states the assumptions and exclusions made to complete the estimate.

 

No allowance was made in the estimate for withholding tax. Import duties have been excluded.

 

21.4.4Basis of Estimate – NPI and Earthworks

 

The estimate for the non-process infrastructure (NPI) and earthworks portion for Xuxa Phase 1 and Barreiro Phase 2 was developed by GE21, Promon and Sigma. The following items were included in the cost estimate:

 

·The bulk earthworks for the plant site preparation

·The mine establishment including the access and service roads, electrical substation and water reservoir with pump.

21501-REP-PM-001
Page | 429

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

·Buildings including workshops, offices , laboratory, canteen, changing rooms, perimeter fencing, security entrance, first aid and fire fighting station

·Plant and waste pile water drainage system

·Lighting and communications systems

 

21.4.4.1Taxes

 

The following taxes were used when applicable for the NPI and geotechnical scope:

 

·Services (installation):

oEarthworks: ISS = 5.0% and PIS / COFINS = 3.65%

oCivil Construction: ISS = 3.0% and PIS / COFINS = 3.65%

oModular Buildings: ISS = 3.0% and PIS / COFINS = 3.65%

oElectromechanical Assembly: ISS = 5.0% and PIS / COFINS = 3.65%

 

·Bulk Materials (supply): ICMS: 12.0%; PIS/COFINS: 9.25%

 

·Equipment (electromechanical):

oICMS: tax between 8.8% and 18.0% based on the submitted proposals

oPIS/COFINS: taxes between 3.65% and 9.25% based on the submitted proposals

 

21.4.4.2Estimate Clarifications and Exclusions

 

The following items will be excluded from the CAPEX cost estimate per Sigma instructions:

 

·Switch room buildings (HV and 3 NPI switch rooms): considered in the OPEX.

 

·CCTV: there will be no CCTV

 

21.4.5Basis of Estimate – Mining

 

The mining fleet and all mining infrastructure including workshops and administrative buildings are the mining contractor’s responsibility. The capital cost for Xuxa mining is limited to the pre-stripping phase, ROM pad construction and the mine site road construction, while for Barreiro, it is limited to pre-stripping, road construction, ROM pad construction and waste stripping in years 4, 5 and 6.

 

Table 21-8 shows the summary of the estimated capital mining cost for Xuxa and Table 21-9 summarizes the estimated capital mining cost for Barreiro.

 

Table 21-8 – Xuxa Estimated Capital Mining Cost

 

Mining Item Cost US$
Internal Roads 443,732
Pre-stripping (with Mobilization) 6,168,390
ROM Pad Construction 686,706
Total 7,298,829

21501-REP-PM-001
Page | 430

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 21-9: Barreiro Estimated Capital Mining Cost

 

Operating Year Mining Item Cost ($US)
Year 0 Mobilization 642,717
Site Construction 735,850
Roads 717,641
Sub Total 2,096,207
Year 4 Waste 56,729,223
Year 5 Waste 52,927,849
Year 6 Waste 50,830,672
  Total 162,583,951

 

21.4.6Basis of Estimate – Owner’s cost

 

The project Owner’s cost for Xuxa Phase 1 and Barreiro Phase 2 as estimated and provided by Sigma are US$9.8 M and US $3.2 M respectively.

 

21.5Operating Costs

 

21.5.1Operating Cost Summary

 

The processing plant operating cost estimate includes the operation of a three-stage crushing and screening circuit and DMS circuits (two stages for coarse, fine and ultra fines material classes).

 

The processing OPEX includes operating and maintenance labour, power, fuel and indirect charges associated with the processing plant. Based on these cost assumptions, inclusions and exclusions, it is estimated that the OPEX for the Xuxa concentrator will be $10.20/t of ore feed (or $55.73/t of spodumene concentrate produced) (Table 21-10). The estimated OPEX for the Barreiro concentrator is $8.40/t of ore feed (or $58.40/t of spodumene concentrate produced) (see Table 21-11).

 

Is it worth noting that General and Administration (G&A) costs to manage the site (including the two concentrators) has been accounted for into the Xuxa concentrator OPEX exercise, which explains the majority of the cost difference between to two processing plants.

 

Table 21-10: Xuxa Concentrator OPEX Processing Cost Summary

 

DESCRIPTION OPEX (US$)
Mining (US$/t material mined) $2.06
Process (US$/t ore feed) $10.2
G&A (US$/t ore feed) $3.3
Shipping (US$/t SC) $119

 

Table 21-11: Barreiro Concentrator OPEX Processing Cost Summary

 

DESCRIPTION OPEX (US$)
Mining (US$/t material mined) $2.68
Process (US$/t ore feed) $8.4

21501-REP-PM-001
Page | 431

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

DESCRIPTION OPEX (US$)
G&A (US$/t ore feed) $4.3
Shipping (US$/t SC) $110

  

21.5.2Operating Cost Details

 

The OPEX cost summary breakdown for Xuxa and Barreiro are presented in Table 21-12 and Table 21-13 respectively.

 

Table 21-12: Xuxa Processing Plant OPEX Cost Summary Breakdown

 

Unit Cash Cost
Analysis
US$
000
per /
year
US$/t
ROM
Plant    
- Labour 3,278 1.93
- Operating consumables 3,486 2.05
- Power 3,471 2.04
- Maintenance supplies 3,657 2.15
- Lease mobile equipment 2,321 1.37
Total 16,212 9.54
Transportation and G&A    
- Concentrate transport 32,021 18.84
- General and Administration 4,802 2.82
Total 36,822 21.66
Plant    
 - Variable  8,777 5.16
 - Fixed 7,435  
Total 16,212  

21501-REP-PM-001
Page | 432

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 21-13: Barreiro Processing Plant OPEX Cost Summary Breakdown

 

Unit Cash Cost
Analysis
US$
000
per /
year
US$/t
ROM
Plant    
- Labour 2,848 1.54
- Operating consumables 3,791 2.05
- Power 3,471 1.88
- Maintenance supplies 3,146 1.70
- Lease mobile equipment 2,321 1.25
Total 15,576 8.42
Transportation and G&A    
- Concentrate transport 25,320 13.69
- General and Administration 7,802 4.22
Total 33,121 17.90
Plant    
 - Variable  8,862 4.79
 - Fixed 6,714  
Total 15,576  

 

21.5.2.1Basis of Estimate (Production)

 

The basis of the data sources, assumptions, cost inclusions and cost exclusions for the process operating costs is as follows.

 

21.5.2.1.1Labour

 

An allowance has been made for production, maintenance and management personnel associated with running the processing plant. The plant will be operating seven days a week with the following schedules:

 

·The crushing plant is based upon three shifts of eight hours per day operation

·The DMS plant is based upon three shifts of eight hours per day operation

 
Personnel requirements are provided in Table 21-14. The staffing levels reflect previous experiences of similar hardrock lithium operations and the Brazilian labour law. 

21501-REP-PM-001
Page | 433

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 21-14: Labour Summary

 

Labour

Xuxa
Plant
 

Total
Number
Employed
 

Barreiro
Plant
 

Total
Number
Employed
 

Administration Department    
Operations Manager 1 0
Plant Operations    
Chief Metallurgist 1 0
Shift Supervisor 4 4
Control room operator 4 4
Store man 4 0
Head of Security 1 0
Crushing Operator 12 12
DMS Operator 12 12
Utility Operator/Crusher feed/DMS feed 8 8
Journeyman (mechanic and electrician) 8 8
Mobile Equipment Operator 4 4
Mining and Geology    
Mining Engineer 2 0
Geology 2 3
Surveyor 2 2
Laboratory    
Metallurgist 3 2
Met tech 3 2
Laboratory Supervisor 4 4
Laboratory Technician 8 8

21501-REP-PM-001
Page | 434

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Labour

Xuxa
Plant
 

Total
Number
Employed
 

Barreiro
Plant
 

Total
Number
Employed
 

HSE and Environment    
HSE and Sustainability coordinator 1 0
HSE Assistant 2 2
Environment Controller 1 1
Maintenance    
Maintenance chief 1 1
Mechanical maintenance supervisor 1 1
Production / maintenance coordination planner 1 1
Mechanics 4 6
Assistant Mechanics 4 6
Electricians 4 3
Assistant Electrician 4 3
Technicians / instrumentation 4 3
Production / Maintenance Coordinator Planner 1 1
TOTAL LABOUR EMPLOYED 110 101

 

Operating labor cost is estimated to be US$3.3 M per annum for the Xuxa processing cost and US$2.8 M per annum for the Barreiro processing cost.

 

21.5.2.1.2Operating Consumables

 

The consumables are split into three areas: Crushing and screening circuit, DMS plant and reagents. In the crushing circuit, costs for crusher liners and screen panels are provisioned. In the DMS plant, costs for cyclones, pumps, screens and belt filter replacement are included in maintenance supply cost estimates. 

21501-REP-PM-001
Page | 435

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

21.5.2.1.3Reagents

 

The reagents will include ferrosilicon and flocculant.

 

·Ferrosilicon: costs are estimated on a consumption rate of 530 g/t (based on industry standards and Primero data base) and indicative cost of US$1,368/t provided by DMS Powder (Pty) Ltd

·Flocculant: Flomin 905 VHM (Magna Floc 10 equivalent) costs are estimated on a consumption rate of 10 g/t (based on test work) and an indicative cost of US$4,056/t provided by SNF Brazil

·These costs include the costs of delivery

·No allowance has been made for first-fill consumable inventory stocks (these are included in CAPEX as part of Owner’s cost). Assumptions are based upon Primero’s recent lithium experience with a similar processing facility and quotes from the in-country sources.

 

21.5.2.1.4Power Cost

 

The OPEX was based on 6 US cents per kWh, based on the cost estimate provided by Sigma.

 

Power consumption was determined based on calculated plant utilization and the mechanical equipment list on an 80% load factor in operation. The estimated installed power for the processing plant is 6.3 MW; an allowance of 241 kW has also been made for lighting, heating and ancillary buildings. This includes the power consumed in the crushing circuit.

 

21.5.2.1.5Maintenance Materials

 

Laboratory supply costs have been allocated a lump sum of US$250,000.

 

21.5.2.1.6Lease of Mobile Equipment

 

The mobile equipment will be leased. The lease costs rates for light vehicles for supervisors, heavy equipment for feeding ore, service trucks for maintenance and minibuses for personnel transport have been used for the estimates.

 

21.5.2.1.7Concentrate Transport

 

Concentrate transport cost has been estimated at an average LOM of US$32.0 M per annum or US$118.6/t of concentrate produced for Phase 1 per Sigma input based on preliminary estimates. This includes the cost from the site to the Port of Ilhéus in Brazil and to the final port of Shanghai, China. Phase 2 transportation cost has been estimated in an average LOM US$25.3 M per annual or US$ 110.3/t of concentrate produced for Phase 2.

 

21.5.2.1.8General & Administration

 

General and administration costs of the company have been estimated at US$12.6 M per annum for the combined Phase 1 and Phase 2 Production Plant as per Sigma provided input.

 

21.5.3Indirect Production Costs

 

Indirect processing and site administration costs have been included for the processing plant. These costs cover such matters as communications and information technology (IT), engineering, environmental and rehabilitation consultants and services, cleaning contractors, staff training, amenities, fringe benefits and similar for processing and maintenance personnel, health and safety, insurances, and rates, leases and licenses.

 

21.5.4Pre-Production Costs

 

Pre-production costs have been included in the CAPEX. These are costs normally associated with the plant and incurred prior to and during commissioning, including early employment of operations personnel and associated recruitment, training and mobilization, first fill consumables and stock of reagents, maintenance spares and associated indirect costs incurred during this period. 

21501-REP-PM-001
Page | 436

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

21.5.5Qualifications and Exclusions

 

The operating cost estimate is presented with the following qualifications and exclusions:

 

·General Qualifications

·Costs for labour and salaries were provided by Sigma based on current Brazilian standards

·OPEX costs for mining, crushing contractor, power substation, concentrate transport (road transport, port and shipping), power and mobile equipment rental were obtained by Sigma and provided to Primero

·No contingency allowance for OPEX

·General and Administration:

·Benefits and overheads are included in Sigma provided salary overheads

·Workforce assumed to be local: no allowance for flights to site

·Security personnel costs included as per client input

·Training cost is included in the pre-production CAPEX

·Mining

·Start-up stockpile re-handling costs excluded (in mining cost)

·The Owner’s mining and geology team are included in the OPEX (labour)

·Ore Handling

·Plant OPEX includes feeding of primary crusher

·Concentrate

·Concentrate packaging not allowed for – based on bulk truck transport

·Concentrate transport includes land transport to Port of Ilhéus, port handling and shipping CIF Port of Shanghai

·Tailings storage

·Tailings storage transport costs to waste pile included in OPEX.

·Environmental

·Rehabilitation costs are included in deferred CAPEX

·Consumables

·Reagents and consumables quoted FOB at supplier’s location in Brazil

·Allowance of 20% transport to site from the supplier’s location in Brazil

·Diesel costs as advised by Sigma

·Utilities

·Power cost as advised by Sigma

·Mobile Equipment

·Plant mobile equipment costs include fuel and maintenance

·Leasing costs considered (not rental)

·Maintenance

·An allowance of 2.3% of installed capital cost was made to cover all maintenance costs

·Exclusions

·Exchange rate variations

·Escalation from the date of estimate

·Local / regional government rates and charges (covered in Owner’s G&A)

·Subsidies to local community (covered in Owner’s G&A)

·Marketing costs: no specific budget allocated to this item, not required

·Government monitoring and compliance: outset licensing costs included, no ongoing costs

·Overtime allowances: not applicable

·Union fees: not applicable (2017 Labor reform law)

21501-REP-PM-001
Page | 437

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

·Contract labour excluded (weightometer checks, lab QA, plant audits, met audits, chemical suppliers): not required

·For the laboratory, the following costs are excluded: grade control and exploration analytical costs, external assaying charges, metallurgical and environmental testing costs, external laboratory costs

·Water supply costs from river (not applicable)

 

21.5.6Operating Cost Summary – Mining

 

Table 21-15 shows the summary of the estimated operating mining cost for Xuxa and Table 21-16 summarizes the estimated operating mining cost for Barreiro.

 

Table 21-15: Xuxa Mining OPEX Costs

 

 

Table 21-16: Barreiro Mining OPEX Costs

 

21501-REP-PM-001
Page | 438

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

22ECONOMIC ANALYSIS

 

22.1Economic Assumptions

 

Three levels of economic analyses were undertaken for the Project, contemplating the mining of the Mineral Reserves of:

 

·the Xuxa deposit (Phase 1);

·the Barreiro deposit (Phase 2); and

·both Phase 1 and Phase 2 (Phase 1+2).

 

Additionally, the economic analyses contemplate the production of spodumene concentrate (SC) at grades of 6.0%, 5.5% and 5.2% Li2O, in order to consider the current lithium market conditions.

 

The economic analyses were undertaken on a 100% equity basis and were developed using the discounted cash flow method based on the data and assumptions detailed in this report for revenue, capital expenditures (Capex) and operating cost (Opex) estimates. An exchange rate of 5.30 BRL per US$ was used to convert particular components of the cost estimates into US$. No provisions were made for the effects of inflation and the base currency was considered on a constant 2022 US$ basis. Exploration costs are deemed outside of the Project and any additional Project study costs have not been included in the analyses.

 

The base case scenario after-tax net present value (NPV) results are detailed in Table 22-1 below. The discount rate assumed for the after-tax NPVs is 8%.

 

Table 22-1 – Base Case After-Tax NPVs

 

Modelled Case Unit @ 6.0% SC @ 5.5% SC @ 5.2% SC
Phase 1 US$ M $2,187 $2,643 $2,820
Phase 2 US$ M $1,853 $2,438 $2,611
Phase 1+2 US$ M $4,043 $5,083 $5,435

 

A sensitivity analysis reveals that the Project’s viability will not be significantly vulnerable to variations in capital expenditures, within the margins of error associated with the DFS and PFS estimates for Phase 1 and Phase 2, respectively. In contrast, the Project’s economic returns remain most sensitive to changes in spodumene prices, feedstock grades and recovery rates.

 

22.1.1Spodumene Concentrate Price Forecast

 

The commodity price forecast used in the base case scenarios are detailed in Figure 22-1 below. The price forecast for spodumene concentrate was based on a 9.0% factor applied to Benchmark Mineral Intelligence’s Q1-2022 lithium hydroxide price projections. The sensitivity analyses consider a range of ±20% versus the base case forecasts.

21501-REP-PM-001
Page | 439

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 22-1: Spodumene Concentrate Price Forecast

 

22.1.2Taxation

 

Phase 1, Phase 2 and Phase 1+2 were evaluated on a pre- and after-tax basis. It must be noted that there are many potential complex factors that affect the taxation of a mining project. The taxes, depletion, and depreciation calculations in the economic analyses are simplified and only intended to give a general indication of the potential tax implications at the project level.

 

Sudene is a government agency tasked with stimulating economic development in specific geographies of Brazil. The project is to be installed in a Sudene-covered geographic area, where a tax incentive granted to the project indicates a 75% reduction of income tax for 10 years, after achieving at least 20% of its production capacity. The considered Brazilian income tax rate is assumed to be 15.25%, which represents the Sudene tax benefit applied to the Brazilian maximum corporate tax of 34% on taxable income (25% income tax plus 9% social contribution). For Phase 2 and Phase 1+2, the Sudene tax incentive is expected to be renewed after the 10th anniversary of achieving at least 20% of their production capacities.

 

The Project is expected to be exempt from all importation taxes for products which there is no similar item produced in Brazil (Ex-Tarifário). Assembled equipment where some but not all individual components are produced in Brazil can be considered exempt from import taxes under these terms.

 

22.1.3Royalties

 

The Project royalties will include:

 

·A 2.0% CFEM royalty on gross spodumene revenue, paid to the Brazilian Government. The CFEM royalty amount is split between the Federal Government of Brazil (12%), State Government of Minas Gerais (23%), and Municipal Government of Araçuaí (65%).

·A 1.0% NSR royalty with permissible deductions from gross spodumene revenue including the CFEM royalty, any commercial discounts, transportation costs and taxes paid.

·A 1.0% NSR royalty with permissible deductions including all of the costs associated with production; however, this royalty has a buyback provision for US$3.8 million which is assumed to be exercised upon achieving commercial production in the Phase 1, Phase 2 and Phase 1+2 analyses.

21501-REP-PM-001
Page | 440

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

22.2Phase 1 DFS Economic Analysis

 

The Phase 1 economic analysis is based on an eight-year operation sourcing feedstock ore from the Xuxa deposit’s Mineral Reserve of 11.8 Mt grading at 1.55% Li2O. Phase 1 is expected to generate run-rate production of up to 286 ktpa of lithium concentrate, delivering US$485 million of annual free cash flow, at a 5.2% SC grade.

 

The base case scenario results are detailed in Table 22-2 below.

 

Table 22-2: Phase 1 Base Case Scenario Results

 

Item Unit @ 6.0% SC @ 5.5% SC @ 5.2% SC
After-Tax NPV @ 8% US$ M $2,187 $2,643 $2,820
After-Tax IRR % 482% 571% 606%
After-Tax Payback Period years 0.3 0.2 0.2

 

22.2.1Phase 1 DFS Technical Assumptions

 

The key technical assumptions used in the base case are highlighted below in Table 22-3.

 

Table 22-3: Key Phase 1 Technical Assumptions

 

Item Unit @ 6.0% SC @ 5.5% SC @ 5.2% SC
Total Ore Processed (ROM) Mt 11.8 11.8 11.8
Annual ROM Ore Processed Mt 1.5 1.5 1.5
Run-Rate SC Production ktpa 230 270 286
Run-Rate LCE Production (Note 1) ktpa 34 37 37
Strip Ratio ratio 16.4: 1 16.4: 1 16.4: 1
Average Li2O Grade % 1.55% 1.55% 1.55%
Spodumene Recovery Rate % 60.4% 65.0% 65.0%
Spodumene Concentrate Grade % Li2O 6.0% 5.5% 5.2%
Operating Life years 8 8 8
Total Cash Cost (FOB) US$/t SC $386 $339 $324
Transportation Costs (CIF China) US$/t SC $119 $119 $119
Total Cash Cost (CIF China) US$/t SC $505 $458 $443
AISC (CIF China) US$/t SC $506 $459 $444
Mining Costs US$/t Material Mined $2.06 $2.06 $2.06
Processing Costs US$/t ROM $10.20 $10.20 $10.20
G&A Costs US$/t ROM $3.26 $3.26 $3.26

 

Note 1: tonnage based on direct conversion to LCE excluding conversion rate

 

22.2.2Phase 1 DFS Financial Results

 

Table 22-4 and Figures 22-2 through 22-4 below illustrate the after-tax cash flow and cumulative cash flow profile of Phase 1 under the base case scenarios. The intersection of the after-tax cumulative cash flow with the horizontal zero line represents the payback period of the Capex to production. 

21501-REP-PM-001
Page | 441

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

As highlighted in Table 22-4, the total gross revenue derived from the sale of spodumene concentrate is estimated up to US$5.7 billion, an average revenue of US$2,499/t 5.2% SC with total operating costs (including royalty payments and commercial discounts) of US$1.0 billion at an average cost of US$443/t 5.2% SC. The resulting after-tax earnings margin (gross revenue less realization, operating costs and taxes) was estimated at US$3.9 billion.

 

This robust cash flow profile compares to an estimated remaining pre-production Capex of US$110.9 million which includes the DMS plant, non-process infrastructure, and owner’s cost. The estimated project and mine closure costs are approximately US$3.4 million and are considered in the base case of the economic study.

 

Additionally, a summary of the Phase 1 Financial Models under the base case scenario at 6.0%, 5.5% and 5.2% SC are provided in Figures 22-4 through 22-6 below. The discount rate assumed for the pre- and after-tax NPVs is 8%. 

21501-REP-PM-001
Page | 442

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 22-4: Phase 1 Estimated Revenue and Operating Costs

 

  6.0% SC 5.5% SC 5.2% SC
 

Total 

US$ M

Avg. 

US$/t 

Total 

US$ M 

Avg. 

US$/t 

Total 

US$ M 

Avg. 

US$/t 

Gross Revenue $4,598 $2,499 $5,398 $2,499 $5,710 $2,499
Less: Realization Costs            
Royalties $129 $70 $152 $70 $160 $70
Commercial Discounts - - - - - -
Total Realization Costs $129 $70 $152 $70 $160 $70
Net Revenue $4,469 $2,429 $5,246 $2,429 $5,549 $2,429
Less: Site Operating Costs            
Mining $422 $229 $422 $195 $422 $185
Processing $120 $65 $120 $56 $120 $53
Selling, General & Administration $38 $21 $38 $18 $38 $17
Transportation $218 $119 $256 $119 $271 $119
Total Operating Costs $799 $434 $837 $387 $852 $373
Less: Depreciation $113 $61 $113 $52 $113 $49
Pre-Tax Earnings $3,557 $1,933 $4,297 $1,989 $4,585 $2,007
% Pre-Tax Earnings Margin of Net Sales 80% 80% 82% 82% 83% 83%
Less: Taxes $542 $295 $655 $303 $699 $306
After-Tax Earnings $3,015 $1,638 $3,642 $1,686 $3,886 $1,701
% After-Tax Earnings Margin of Net Sales 67% 67% 69% 69% 70% 70%

21501-REP-PM-001
Page | 443

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

 

Figure 22-2: Phase 1 After-Tax Cash Flow and Cumulative Cash Flow Profile @ 6.0% SC

 

 

Figure 22-3: Phase 1 After-Tax Cash Flow and Cumulative Cash Flow Profile @ 5.5% SC

 

 

Figure 22-4: Phase 1 After-Tax Cash Flow and Cumulative Cash Flow Profile @ 5.2% SC 

21501-REP-PM-001
Page | 444

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 22-5 : Phase 1 Financial Model Summary @ 6.0% SC

21501-REP-PM-001
Page | 445

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 22-6: Phase 1 Financial Model Summary @ 5.5% SC

21501-REP-PM-001
Page | 446

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 22-7: Phase 1 Financial Model Summary @ 5.2% SC

21501-REP-PM-001
Page | 447

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

22.2.3Phase 1 DFS Sensitivity Analysis

 

A sensitivity analysis for Phase 1 was carried out with the base case as described above as the midpoint. An interval of ±20% versus base case values was considered with increments of 10%.

 

The sensitivity analysis assesses the impact of changes in spodumene price, spodumene recovery rates, lithium grade, BRL to US$ exchange rate, Capex, Opex, and discount rate on Phase 1 after-tax NPV and IRR.

 

As seen in Figures 22-8 through 22-10, Phase 1 after-tax NPV is not significantly vulnerable to changes in BRL to US$ exchange rate, Capex, Opex, or discount rate considered. In contrast, Phase 1 after-tax NPV is more sensitive to variation in spodumene price, lithium grade, and spodumene recovery rates.

 

As seen in Figures 22-11 through 22-13, Phase 1 after-tax IRR is not significantly vulnerable to changes in Opex. In contrast, Phase 1 after-tax IRR is more sensitive to variation in spodumene price, lithium grade, spodumene recovery rates, BRL to US$ exchange rate and Capex. Note that the Phase 1 after-tax IRR is independent of the discount rate considered.

 

 

Figure 22-8: Phase 1 6.0% SC After-Tax NPV Sensitivity Analysis (US$ B)

21501-REP-PM-001
Page | 448

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 22-9: Phase 1 5.5% SC After-Tax NPV Sensitivity Analysis (US$ B)

 

 

Figure 22-10: Phase 1 5.2% SC After-Tax NPV Sensitivity Analysis (US$ B)

21501-REP-PM-001
Page | 449

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 22-11: Phase 1 6.0% SC After-Tax IRR Sensitivity Analysis (US$ B)

 

 

Figure 22-12: Phase 1 5.5% SC After-Tax IRR Sensitivity Analysis (US$ B)

21501-REP-PM-001
Page | 450

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Figure 22-13: Phase 1 5.2% SC After-Tax IRR Sensitivity Analysis (US$ B)

 

22.3Phase 2 PFS Economic Analysis

 

The Phase 2 economic analysis is based on a twelve-year operation sourcing feedstock ore from the Barreiro deposit’s Mineral Reserve of 21.8 Mt grading at 1.37% Li2O. Phase 2 is expected to generate run-rate production of up to 276 ktpa of lithium concentrate, delivering US$366 million of annual free cash flow, at a 5.2% SC grade.

 

The base case scenario results are detailed in Table 22-5 below.

 

Table 22-5: Phase 2 Base Case Scenario Results

 

Item Unit @ 6.0% SC @ 5.5% SC @ 5.2% SC
After-Tax NPV @ 8% US$ M $1,853 $2,438 $2,611
After-Tax IRR % 601% 764% 813%
After-Tax Payback Period years 0.2 0.2 0.1

 

22.3.1Phase 2 PFS Technical Assumptions

 

The key technical assumptions used in the base case are highlighted below in Table 22-6.

21501-REP-PM-001
Page | 451

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

Table 22-6: Key Phase 2 Technical Assumptions

 

Item Unit @ 6.0% SC @ 5.5% SC @ 5.2% SC
Total Ore Processed (ROM) Mt 21.8 21.8 21.8
Annual ROM Ore Processed Mt 1.8 1.8 1.8
Run-Rate SC Production ktpa 210 261 276
Run-Rate LCE Production (Note 1) ktpa 31 36 36
Strip Ratio ratio 12.5: 1 12.5: 1 12.5: 1
Average Li2O Grade % 1.37% 1.37% 1.37%
Spodumene Recovery Rate % 50.9% 57.9% 57.9%
Spodumene Concentrate Grade % Li2O 6.0% 5.5% 5.2%
Operating Life years 12 12 12
Total Cash Cost (FOB) US$/t SC $408 $340 $325
Transportation Costs (CIF China) US$/t SC $110 $110 $110
Total Cash Cost (CIF China) US$/t SC $519 $451 $435
AISC (CIF China) US$/t SC $521 $453 $437
Mining Costs US$/t Material Mined $2.68 $2.68 $2.68
Processing Costs US$/t ROM $8.40 $8.40 $8.40
G&A Costs US$/t ROM $4.30 $4.30 $4.30

 

Note 1: tonnage based on direct conversion to LCE excluding conversion rate

 

22.3.2Phase 2 PFS Financial Results

 

Table 22-7 and Figures 22-14 through 22-16 below illustrate the after-tax cash flow and cumulative cash flow profile of Phase 2 under the base case scenarios. The intersection of the after-tax cumulative cash flow with the horizontal zero line represents the payback period of the Capex to production.

 

As highlighted in Table 22-7, the total gross revenue derived from the sale of spodumene concentrate is estimated up to US$6.9 billion, an average revenue of US$2,074/t 5.2% SC with total operating costs (including royalty payments and commercial discounts) of US$1.4 billion at an average cost of US$435/t 5.2% SC. The resulting after-tax earnings margin (gross revenue less realization, operating costs and taxes) was estimated at US$4.4 billion.

 

This robust cash flow profile compares to an estimated pre-production Capex of US$75.7 million which includes the DMS plant, non-process infrastructure, and owner’s cost. The estimated project and mine closure costs are approximately US$7.6 million and are considered in the base case of the economic study. Phase 2 also assumes capitalized stripping of US$56.7 million, US$52.9 million and US$50.8 million in years 6, 7 and 8 of the operating life.

 

Additionally, a summary of the Phase 2 Financial Models under the base case scenario at 6.0%, 5.5% and 5.2% SC are provided in Figures 22-16 through 22-18 below. The discount rate assumed for the pre- and after-tax NPVs is 8%.

21501-REP-PM-001
Page | 452

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT 

 

 

 

Table 22-7: Phase 2 Estimated Revenue and Operating Costs

 

  6.0% SC 5.5% SC 5.2% SC
 

Total

US$ M

Avg.

US$/t

Total

US$ M

Avg.

US$/t

Total

US$ M

Avg.

US$/t

Gross Revenue $5,236 $2,074 $6,497 $2,074 $6,872 $2,074
Less: Realization Costs            
Royalties $148 $58 $183 $58 $193 $58
Commercial Discounts - - - - - -
Total Realization Costs $148 $58 $183 $58 $193 $58
Net Revenue $5,088 $2,015 $6,314 $2,016 $6,697 $2,016
Less: Site Operating Costs            
Mining $607 $240 $607 $194 $607 $183
Processing $183 $72 $183 $58 $183 $55
Selling, General & Administration $94 $37 $94 $30 $94 $28
Transportation $279 $110 $346 $110 $366 $110
Total Operating Costs $1,162 $460 $1,229 $392 $1,249 $337
Less: Depreciation $241 $95 $241 $77 $241 $73
Pre-Tax Earnings $3,685 $1,460 $4,845 $1,546 $5,189 $1,566
% Pre-Tax Earnings Margin of Net Sales 72% 72% 77% 77% 78% 78%
Less: Taxes $562 $223 $739 $236 $791 $239
After-Tax Earnings $3,123 $1,237 $4,106 $1,311 $4,398 $1,327
% After-Tax Earnings Margin of Net Sales 61% 61% 65% 65% 68% 68%

21501-REP-PM-001
Page | 453

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

 

Figure 22-14: Phase 2 After-Tax Cash Flow and Cumulative Cash Flow Profile @ 6.0% SC

 

 

Figure 22-15: Phase 2 After-Tax Cash Flow and Cumulative Cash Flow Profile @ 5.5% SC

 

 

Figure 22-16: Phase 2 After-Tax Cash Flow and Cumulative Cash Flow Profile @ 5.2% SC

21501-REP-PM-001
Page | 454

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT 

 

 

 

 

Figure 22-17: Phase 2 Financial Model Summary @ 6.0% SC

21501-REP-PM-001
Page | 455

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

 

Figure 22-18: Phase 2 Financial Model Summary @ 5.5% SC

21501-REP-PM-001
Page | 456

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT 

 

 

 

 

Figure 22-19: Phase 2 Financial Model Summary @ 5.2% SC

21501-REP-PM-001
Page | 457

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT 

 

 

 

22.3.3Phase 2 PFS Sensitivity Analysis

 

A sensitivity analysis for Phase 2 was carried out with the base case as described above as the midpoint. An interval of ±20% versus base case values was considered with increments of 10%.

 

The sensitivity analysis assesses the impact of changes in spodumene price, spodumene recovery rates, lithium grade, BRL to US$ exchange rate, Capex, Opex, and discount rate on Phase 2 after-tax NPV and IRR.

 

As seen in Figures 22-20 through 22-22, Phase 2 after-tax NPV is not significantly vulnerable to changes in BRL to US$ exchange rate, Capex, Opex, or discount rate considered. In contrast, Phase 2 after-tax NPV is more sensitive to variation in spodumene price, lithium grade, and spodumene recovery rates.

 

As seen in Figures 22-23 through 22-25, Phase 2 after-tax IRR is not significantly vulnerable to changes in Opex. In contrast, Phase 2 after-tax IRR is more sensitive to variation in spodumene price, lithium grade, spodumene recovery rates, BRL to US$ exchange rate and Capex. Note that the Phase 2 after-tax IRR is independent of the discount rate considered.

 

 

Figure 22-20: Phase 2 6.0% SC After-Tax NPV Sensitivity Analysis (US$ B)

21501-REP-PM-001
Page | 458

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT 

 

 

 

 

Figure 22-21: Phase 2 5.5% SC After-Tax NPV Sensitivity Analysis (US$ B)

 

 

Figure 22-22: Phase 2 5.2% SC After-Tax NPV Sensitivity Analysis (US$ B)

21501-REP-PM-001
Page | 459

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

 

Figure 22-23: Phase 2 6.0% SC After-Tax IRR Sensitivity Analysis (US$ B)

 

 

Figure 22-24: Phase 2 5.5% SC After-Tax IRR Sensitivity Analysis (US$ B)

21501-REP-PM-001
Page | 460

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

 

Figure 22-25: Phase 2 5.2% SC After-Tax IRR Sensitivity Analysis (US$ B)

 

22.4Phase 1 + Phase 2 PFS Economic Analysis

 

The Phase 1+2 economic analysis is based on a thirteen-year operation sourcing feedstock ore from the Xuxa and Barreiro’s combined Mineral Reserves of 33.6 Mt. Phase 1+2 is expected to generate run-rate production of up to 562 ktpa of lithium concentrate, delivering US$637 million of annual free cash flow, at a 5.2% SC grade.

 

The base case scenario results are detailed in Table 22-8 below.

 

Table 22-8: Phase 1+2 Base Case Scenario Results

 

Item Unit @ 6.0% SC @ 5.5% SC @ 5.2% SC
After-Tax NPV @ 8% US$ M $4,043 $5,083 $5,435
After-Tax IRR % 495% 589% 624%
After-Tax Payback Period years 0.3 0.3 0.2

 

22.4.1Phase 1+2 PFS Technical Assumptions

 

The key technical assumptions used in the base case are highlighted below in Table 22-9.

21501-REP-PM-001
Page | 461

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT 

 

 

 

Table 22-9: Key Phase 1+2 Technical Assumptions

 

Item Unit @ 6.0% SC @ 5.5% SC @ 5.2% SC
Total Ore Processed (ROM) Mt 33.6 33.6 33.6
Annual ROM Ore Processed Mt 2.6 2.6 2.6
Run-Rate SC Production ktpa 440 531 562
Run-Rate LCE Production (Note 1) ktpa 65 72 72
Strip Ratio ratio 13.8: 1 13.8: 1 13.8: 1
Average Li2O Grade % 1.43% 1.43% 1.43%
Spodumene Recovery Rate % 54.4% 60.5% 60.5%
Spodumene Concentrate Grade % Li2O 6.0% 5.5% 5.2%
Operating Life years 13 13 13
Total Cash Cost (FOB) US$/t SC $399 $340 $325
Transportation Costs (CIF China) US$/t SC $114 $114 $114
Total Cash Cost (CIF China) US$/t SC $513 $454 $438
AISC (CIF China) US$/t SC $515 $455 $440
Mining Costs US$/t Material Mined $2.39 $2.39 $2.39
Processing Costs US$/t ROM $9.04 $9.04 $9.04
G&A Costs US$/t ROM $3.93 $3.93 $3.93

 

Note 1: tonnage based on direct conversion to LCE excluding conversion rate

 

22.4.2Phase 1+2 PFS Financial Results

 

Table 22-10 and Figures 22-26 through 22-28 below illustrate the after-tax cash flow and cumulative cash flow profile of Phase 1+2 under the base case scenarios. The intersection of the after-tax cumulative cash flow with the horizontal zero line represents the payback period of the Capex to production.

 

As highlighted in Table 22-10, the total gross revenue derived from the sale of spodumene concentrate is estimated up to US$12.6 billion, an average revenue of US$2,247/t 5.2% SC with total operating costs (including royalty payments and commercial discounts) of US$2.5 billion at an average cost of US$438/t 5.2% SC. The resulting after-tax earnings margin (gross revenue less realization, operating costs and taxes) was estimated at US$8.3 billion.

 

This robust cash flow profile compares to estimated Phase 1 pre-production Capex of US$110.9 million and Phase 2 expansionary Capex of US$75.7 million in the second year of operations. The estimated project and mine closure costs are approximately US$7.6 million and are considered in the base case of the economic study. Phase 1+2 also assumes the Phase 2 capitalized stripping of US$56.7 million, US$52.9 million and US$50.8 million in years 6, 7 and 8 of the operating life.

 

Additionally, a summary of the Phase 1+2 Financial Models under the base case scenario at 6.0%, 5.5% and 5.2% SC are provided in Figures 22-28 through 22-30 below. The discount rate assumed for the pre- and after-tax NPVs is 8%.

21501-REP-PM-001
Page | 462

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT 

 

 

 

Table 22-10: Phase 1+2 Estimated Revenue and Operating Costs

 

  6.0% SC 5.5% SC 5.2% SC
 

Total

US$ M

Avg.

US$/t

Total

US$ M

Avg.

US$/t

Total

US$ M

Avg.

US$/t

Gross Revenue $9,834 $2,253 $11,895 $2,247 $12,582 $2,247
Less: Realization Costs            
Royalties $277 $63 $335 $63 $354 $63
Commercial Discounts - - - - - -
Total Realization Costs $277 $63 $335 $63 $354 $63
Net Revenue $9,557 $2,190 $11,561 $2,184 $12,228 $2,184
Less: Site Operating Costs            
Mining $1,029 $236 $1,029 $194 $1,029 $184
Processing $303 $69 $303 $57 $303 $54
Selling, General & Administration $132 $30 $132 $25 $132 $24
Transportation $497 $114 $602 $114 $637 $114
Total Operating Costs $1,961 $449 $2,066 $390 $2,101 $375
Less: Depreciation $355 $81 $355 $67 $355 $63
Pre-Tax Earnings $7,241 $1,659 $9,140 $1,727 $9,772 $1,746
% Pre-Tax Earnings Margin of Net Sales 76% 76% 79% 79% 80% 80%
Less: Taxes $1,104 $253 $1,394 $263 $1,490 $266
After-Tax Earnings $6,137 $1,406 $7,746 $1,463 $8,282 $1,479
% After-Tax Earnings Margin of Net Sales 64% 64% 67% 67% 68% 68%

21501-REP-PM-001
Page | 463

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

 

Figure 22-26: Phase 1+2 After-Tax Cash Flow and Cumulative Cash Flow Profile @ 6.0% SC

 

 

Figure 22-27: Phase 1+2 After-Tax Cash Flow and Cumulative Cash Flow Profile @ 5.5% SC

 

 

Figure 22-28: Phase 1+2 After-Tax Cash Flow and Cumulative Cash Flow Profile @ 5.2% SC

21501-REP-PM-001
Page | 464

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

 

Figure 22-29: Phase 1+2 Financial Model Summary @ 6.0% SC

21501-REP-PM-001
Page | 465

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

 

Figure 22-30: Phase 1+2 Financial Model Summary @ 5.5% SC

21501-REP-PM-001
Page | 466

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT 

 

 

 

 

Figure 22-31: Phase 1+2 Financial Model Summary @ 5.2% SC

21501-REP-PM-001
Page | 467

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT 

 

 

 

22.4.3Phase 1+2 PFS Sensitivity Analysis

 

A sensitivity analysis for Phase 1+2 was carried out with the base case as described above as the midpoint. An interval of ±20% versus base case values was considered with increments of 10%.

 

The sensitivity analysis assesses the impact of changes in spodumene price, spodumene recovery rates, lithium grade, BRL to US$ exchange rate, capital expenditures, operating expenses, and discount rate on Phase 1+2 after-tax NPV and IRR.

 

As seen in Figures 22-32 through 22-34, Phase 1+2 after-tax NPV is not significantly vulnerable to changes in BRL to US$ exchange rate, Capex, Opex, or discount rate considered. In contrast, Phase 1+2 after-tax NPV is more sensitive to variation in spodumene price, lithium grade, and spodumene recovery rates.

 

As seen in Figures 22-35 through 22-37, Phase 1+2 after-tax IRR is not significantly vulnerable to changes in Opex. In contrast, Phase 1+2 after-tax IRR is more sensitive to variation in spodumene price, lithium grade, spodumene recovery rates, BRL to US$ exchange rate and Capex. Note that the Phase 1+2 after-tax IRR is independent of the discount rate considered.

 

 

Figure 22-32: Phase 1+2 6.0% SC After-Tax NPV Sensitivity Analysis (US$ B)

21501-REP-PM-001
Page | 468

 

NI 43-101 TECHNICAL REPORT
GROTA DO CIRILO LITHIUM PROJECT 

 

 

 

 

Figure 22-33: Phase 1+2 5.5% SC After-Tax NPV Sensitivity Analysis (US$ B)

 

 

Figure 22-34: Phase 1+2 5.2% SC After-Tax NPV Sensitivity Analysis (US$ B)

21501-REP-PM-001
Page | 469

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

 

Figure 22-35: Phase 1+2 6.0% SC After-Tax IRR Sensitivity Analysis (US$ B)

 

 

Figure 22-36: Phase 1+2 5.5% SC After-Tax IRR Sensitivity Analysis (US$ B)

21501-REP-PM-001
Page | 470

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT 

 

 

 

 

Figure 22-37: Phase 1+2 5.2% SC After-Tax IRR Sensitivity Analysis (US$ B)

21501-REP-PM-001
Page | 471

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

 

23ADJACENT PROPERTIES

 

This section is not relevant to this Report.

21501-REP-PM-001
Page | 472

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT 

 

 

 

24OTHER RELEVANT DATA AND INFORMATION

 

24.1Schedule for Xuxa Phase 1

 

The project implementation schedule was developed in conjunction with GE21, Primero and Sigma.

 

Project approval and kick-off is dictated by two major milestones, namely the approval of the Environmental Construction License and confirmation of project financing. To progress the project prior to meeting these two milestones, a contract was awarded for the front-end engineering and design (FEED) for the process plant. This approach allowed process design to progress sufficiently to confirm selection of major long-lead equipment and associated pricing. Both milestones were met in December 2021, long-lead item orders can be placed, and detailed engineering continued after the FEED was completed at the end of November 2021.

 

The schedule for the engineering and design itself is based on a detailed deliverables list with estimated hours and rationalised using Primero’s and Promon’s experience with similar projects. This includes all engineering, drafting, procurement services and management.

 

Procurement and fabrication lead times included are based on competitive tenders issued to the market for all major equipment and fabricated bulks. Allowances have also been made for delivery times to site.

 

Site mobilisation for the bulk earthwork’s construction commenced in November 2021 with grubbing, preparation of laydowns and topsoil removal. Full site establishment for all other site installation works has commenced as bulk earthworks have been completed. The schedules for the various construction contracts have been based on installation man-hours and site durations received from suitably qualified contractors via competitive tendering. The durations, sequencing and site manning levels were all rationalised and adjusted according to construction experience of similar projects within the same area.

 

Commissioning of the process plant has been based on previous experience commissioning plants of similar process design and size.

 

24.1.1Key Dates

 

The project schedule is shown in Figure 25-1.

 

 

Figure 24-1: Xuxa Schedule

21501-REP-PM-001
Page | 473

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

24.1.2Schedule Basis

 

The schedule is based on the following:

 

·Offsite: nominal 40-hour week, no work on public holidays

·Sigma approval period (preferred supplier list, process design and general arrangement drawings only): five working days unless otherwise noted herein

·Onsite construction labour: 190 hrs per month per person. Two shifts considered in certain areas for acceleration. 13 days per fortnight, 10 hours / day, three weeks on, one week off

·Onsite expatriate labour: 13 days per fortnight, 10 hours / day, six weeks on, two weeks off

·No site activities during public holidays.

 

24.2Schedule for Barreiro Phase 2

 

GE21, Primero and SGS prepared a Pre-Feasibility Study (PFS) for the Barreiro deposit.

 

It is noted that the Company has not yet made a production decision in respect of the Barreiro deposit. The Company has made a decision to proceed with a definitive feasibility study before making a production decision in respect of the Barreiro deposit. All statements regarding mine development or production in respect of the Barreiro deposit in this report are expressly qualified by this statement.

 

It is anticipated that the implementation schedule timeline presented in Table 24-1 are applicable for the Phase 2 works. The Phase 2 works will not be concurrent with Phase 1.

 

24.3Schedule for NDC Phase 3

 

GE21, Primero and SGS are working on a Preliminary Economic Assessment (PEA) for Nezinho do Chicao deposit that should be ready later this year.

 

It is noted that the Company has not yet made a production decision in respect of the Nezinho do Chicao deposit. The Company has made a decision to proceed with a definitive feasibility study before making a production decision in respect of the NDC deposit.

 

24.4Project Execution Plan

 

This section describes the project execution plan (PEP) which forms the basis of the Xuxa feasibility study and the Barreiro PFS.

 

24.4.1Mission Statement

 

The project delivery objectives will need to align those of Sigma’s business and project objectives as follows:

 

·Meet or exceed Sigma’s health, safety, environmental, community and project development standards

·Conform to statutory requirements and Sigma’s commitments regarding licenses and approvals

 

24.4.2Scope

 

The Owner’s team has the overall responsibility of managing project implementation. The Owner’s scope of services will include the following:

 

·Obtaining and management of the necessary Federal, State and local permits and approvals

·Preparation of overarching standards, site rules and procedures

·Overall site health, safety and environmental management

21501-REP-PM-001
Page | 474

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

  

·Scope preparation, tendering and award, contract administration and closeout of each of the contracts listed in Section 24.3.4.

·Detailed overview of the engineering ensuring the Sigma requirements are satisfied

·Interface management between the consultant sub-contractors

·Interface with the Sigma corporate office

·Establishment of the operations and mining teams, including the mining operations sub-contractor

·Procurement of spare parts (operating, insurance) (based on spare parts list provided by the suppliers)

·Training and operational readiness

 

24.4.3Criteria and WBS

 

24.4.3.1Project Standards and WBS

 

The design, engineering and project execution will be carried out in accordance with Brazilian Standards and ASME/ANSI and IEC as applicable and as stated in the design criteria. A WBS for the Project has been developed.

 

24.4.4Contracting Strategy

 

The Sigma Owner’s team will be responsible for tendering and award of the major contracts listed in Table 24-2.

 

Table 24-1 – Major Contracts List

 

Package Description
Engineering, Procurement & Construction Management - Overall
Engineering, Procurement and Commissioning – Process Plant
HV power line and HV sub-station
Contract crushing
Contract mining

 

24.4.4.1Engineering, Procurement and Construction Management - Overall

 

Sigma has engaged a suitably qualified engineering, procurement and construction management (EPCM) contractor in Promon Engineering. Promon shall act as an agent of Sigma in all project management and construction activities. Promon shall be responsible for the following services:

 

·Overall project management and construction management (including overall reporting consolidation)

·Overall management of the construction site including health, safety and environmental management.

·Engineering, including topicalization of all Primero plant designs and design of all non-process infrastructure and all procurement and construction management

 

In addition to this, the EPCM contractor will tender and award several sub-contracts to suitably qualified consultants and construction contractors.

21501-REP-PM-001
Page | 475

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

24.4.4.2Engineering, Procurement and Commissioning – Process Plant

 

The Owner’s team has awarded the engineering, and commissioning of the spodumene processing facility to Primero, who has specific experience in designing and delivering processing facilities. The procurement for the plant will be done by Promon in conjunction with Primero.

 

The selected consultant will carry out process plant commissioning to ensure commissioning, ramp-up and full name-plate production is achieved within the shortest possible time.

 

24.4.4.3HV Power Line Feed and Sub-Stations

 

Power will be sourced via a 125 m extension from an existing 138 kV overhead transmission line. Tecnova has been engaged to move the new 138k V overhead transmission line around 300 m north of where it is currently located and to build the High Voltage (HV) substation.

 

CEMIG will supervise the construction.

 

24.4.4.4Contract Mining

 

A suitable mining contractor will be engaged to carry out mining operations throughout the LOM. The mining contractor will mobilise to site approximately six months prior to the commissioning of the process plant in order to carry out site establishment, construction of haul roads and pre-stripping activities. With the exception of diesel fuel storage and distribution, the mining contractor will be responsible for providing all mine services infrastructure in order to operate and maintain the mining fleet and ancillary equipment. This will include, but not be limited to, the heavy vehicle equipment workshops, light vehicle workshops, tyre change facility and general maintenance workshops and warehousing.

 

24.4.5Construction

 

24.4.5.1Construction Management

 

The EPCM contractor Promon will have ownership of the site during construction and shall be responsible for all sub-contractors on site and be responsible for health and safety at site.

 

24.4.5.2Construction Facilities

 

Promon will set-up temporary construction facilities for their own construction management personnel as well as the Owner’s team. The Owner’s team will relocate into the new permanent administration building as soon as installation has been completed.

 

Each construction sub-contractor will be responsible for providing its own construction facilities at designated areas including laydown areas.

 

24.4.5.3Construction Power

 

Until the newly installed substation is energised, all construction power will be supplied via a local 13.4kV powerline.

 

24.4.5.4Construction Security

 

Promon will install a security fence around the perimeter of the site as well as a security hut and boom gate at the entrance to the site for personnel and visitors sign-in and sign-out and for inspection of vehicle loads leaving the site. A sheltered warehouse will be provided and managed by Promon and Sigma for any equipment requiring indoor storage.

21501-REP-PM-001
Page | 476

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

24.4.5.5Accommodation

 

No on-site accommodation has been considered. The Owner’s team and the EPCM contractor will source accommodation locally in the neighbouring towns within reasonable traveling distance to site. All construction contractors will be responsible for providing their own accommodation off-site.

21501-REP-PM-001
Page | 477

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

25INTERPRETATION AND CONCLUSIONS

 

25.1Conclusions

 

This report contains the Phase 3 Mineral Resource Estimate (MRE) for the Nezinho do Chicao pegmatite on top of the technical study assessing the proposed mining operations which contribute towards the findings of the Definitive Feasibility Study (DFS) completed for Phase 1 (Xuxa) and the Pre-Feasibility Study of Phase 2 (Barrerio) of the Grota do Cirilo Project.

 

The DFS outlines the requirements and parameters for the development of two open pits, namely North pit and the South pit. Phase 1 will mine 1.5 Mt ROM per annum for 8 years. The Dense Media concentration plant is designed to produce 220 ktpa of 6% Li2O spodumene concentrate. The DFS describes all the related plant and mine direct and indirect infrastructure required for the project. The PFS outlines the requirements and parameters for the development of an open pit mine consisting of one pit on the Barreiro deposit (Phase 2), together with the concentration plant and related infrastructure to process 1.80 Mtpa of mineralized material per year for a LOM of 12.7 years.

 

The Company has made a construction decision for Phase 1 and this report finalizes the PFS for Phase 2 of the Grota do Cirilo project.  All statements regarding mine development or production in respect of both Phase 1 and 2 in this report are expressly qualified by this statement.

 

25.1.1Mineral Resource

 

Mineral Resource estimates are reported for the Xuxa, Barreiro, Lavra do Meio, Murial and Nezinho do Chicao pegmatites in the Grota do Cirilo property area. Based on the information and reviews presented in this Report, the QP notes that:

 

·Information from experts retained by Sigma supports that the mining tenure held is valid and is sufficient to support declaration of Mineral Resources

·Surface rights to allow exploration-stage activities to have been obtained, in addition, these surface rights will support project evaluation such as DMS pilot plant test work the Grota do Cirilo property area

·Royalties are payable to third parties and the Brazilian government

·To the extent known to the QP, there are no other significant factors and risks that may affect access, title, or the right or ability to perform work on the property that have not been discussed in this Report

·The known deposits within the Project area are examples of LCT pegmatites

·11 pegmatites in the Geniapapo and six pegmatites in the Santa Clara area were considered to have exploration potential; however, no current exploration is planned in this area due to the current focus on the Grota do Cirilo property area

·Sigma has completed ground reconnaissance, satellite image interpretation, geological mapping, channel and chip sampling, trenching, core drilling, and Mineral Resource estimation. A total of 409 core holes (71,538 m) were completed in 2014, and 2017, 2018, 2021 and 2022 for the different MREs. The drilling used conventional methods. Core was logged and photographed. Collar surveys were performed. Core recovery is considered acceptable.

·Most drill holes intersect the mineralized zones at an angle, and the drill hole intercept widths reported for the Project are shorter than true widths

·Sample security procedures met industry standards at the time the samples were collected. Current sample storage procedures and storage areas are consistent with industry standards

·Sample preparation and lithium analyses are performed by accredited laboratories that are independent of Sigma. Sample preparation and analytical methods are appropriate for lithium determination

21501-REP-PM-001
Page | 478

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

·SGS validated the exploration processes and core sampling procedures (2022) used by SMSA as part of an independent verification program. The drill core handling, logging and sampling protocols are at conventional industry standard and conform to generally accept best practices. The sample quality is good and that the samples are generally representative. The system is appropriate for the collection of data suitable for a Mineral Resource estimate

·The sample preparation, analysis and QA/QC protocol used by Sigma for the Project follow generally accepted industry standards and that the Project data is of a sufficient quality.

·Mineral Resources were estimated using ordinary kriging, and were classified using the 2014 CIM Definition Standards

·Mineral Resources can be affected by the market value of lithium and lithium compounds or the modification of the Brazilian taxation regime environmental policies

 

The Mineral Resource estimates are reported using a 0.5% Li2O cut-off. The Mineral Resources are constrained by the topography and based on the conceptual economic parameters stated in the notes below. The NDC estimate has an effective date of May 30, 2022. The QP for the estimate is Mr. Marc-Antoine Laporte, P.Geo., an employee of SGS Canada Inc.

 

25.1.2Process Plant

 

Spodumene concentrate with a minimum grade of 6.0% Li2O was achieved during metallurgical testing programs on both Phase 1 (Xuxa) and Phase 2 (Barreiro) samples at SGS Canada in Lakefield.

 

The metallurgical test work showed that spodumene can be recovered via a DMS circuit, which includes coarse, fines, and ultrafines DMS unit operations. Based on test work results, plant design was based on stage lithium recoveries of 70% for Phase 1 and 60% for Phase 2 to produce 6.0% Li2O spodumene concentrate.

 

The spodumene concentration plants are designed to process 1.5 Mtpa for Phase 1 and 1.80 Mtpa for Phase 2 to produce jointly a total >440,000 dry tonnes of 6.0% Li2O spodumene concentrate.

 

The flowsheets include conventional three-stage crushing/screening, upflow classification, DMS, magnetic separation, thickening, filtration, and storage and shipping areas for spodumene concentrate. The QP concludes that the project is technically feasible to proceed to detailed engineering and construction for phase 1 and further studies for Phase 2.

 

25.1.3Infrastructure

 

The necessary non-process infrastructure for the plant that will need to be installed includes: the main high voltage electrical substations, the main site access roads (municipal), administrative buildings including medical clinic, mess hall and kitchen, warehouse and maintenance building, utilities storage and reticulation (compressed air, process potable and fire-fighting water).

 

25.1.4Water Management

 

The water management infrastructure is considered to be sufficiently sized to manage the expected surface runoff volumes.

 

25.1.5Mining

 

The Xuxa Deposit will be mined by conventional open-pit mining methods for an eight-year mine life, at a plant feed rate of 1.5 Mtpy, with Mineral Reserves totaling 11.8 Mt grading at 1.55% Li2O. The Barreiro Deposit will also be mined by conventional open-pit methods for a twelve-year mine life, at a plant feed rate of 1.80 Mtpy, with Mineral Reserves totalling 21.8 Mt grading 1.36% Li2O

21501-REP-PM-001
Page | 479

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Mining operations are based on the use of hydraulic excavators and a haul truck fleet engaged in conventional open pit mining techniques. Excavated material will be loaded in trucks and hauled to either the ROM pad or the waste piles. Controlled blasting (pre-splitting) techniques will be used for the mineralized domain to reduce back-break and to better control dilution.

 

25.1.5.1Waste and tailings

 

Five waste dumps are proposed for the Xuxa mine and one waste dump for the Barreiro mine. All dumps are near the respective open pits. The dumps are considered suitable for the volume of waste that will be generated from each of the respective mines.

 

Tailings from the DMS plants will be thickened, dewatered and dry-stacked in a tailings waste pile.

 

25.1.6Geotechnical and Hydrogeology

 

Geotechnical field studies, analyses and design were performed to provide key pit design parameters for the Xuxa North and South pits and the Barreiro pit.

 

Stability analyses for both the Xuxa and Barreiro pits indicate the pit slope designs are stable and fall within acceptable safety limits for open-pit designs.

 

A hydrogeological study, consisting of fieldwork, mathematical modeling, studies of regional water characteristics, and the potential impacts on Xuxa open pit mining, was performed.

 

A complementary campaign of geotechnical oriented drill holes and pressurized water loss tests (Packer Test) was carried out to measure the hydraulic conductivity of the rock mass, the hydrogeological characterization of the operation site, and to assess the likelihood of groundwater inflow from Piaui River into the North and South Xuxa pits.

 

Overall, test results showed that rock fractures have very low to low specific losses, giving them a virtually tight rock classification.

 

25.1.7Environment

 

The Environmental Impact Study - EIA and its respective Environmental Impact Report - RIMA will be submitted to the regulatory agency, Bureau of Priority Projects - SUPPRI, as a supporting document to obtain a Preliminary License - LP and an Installation License - LI for Grota do Cirilo Project - Barreiro Pegmatite.

 

Sigma holds approved PAEs over the Xuxa, Barreiro, Lavra do Meio, Murial, Maxixe and Nezinho do Chicâo deposits within the Grota do Cirilo property. Licenses are renewed in a timely manner when due.

 

25.1.8Capital Cost Estimate

 

As a basis for the CAPEX build-up, engineering and design were advanced to a FEED level for the Xuxa plant and a pre-feasibility level for the Barreiro plant with approval of key deliverables obtained from Sigma. These included the design basis, process design criteria, block flow diagram, process flow diagram, a high-level mass balance basis of design along with a similar project execution plan, schedule and site conditions as Xuxa Phase 1 FEED.

 

The total CAPEX for Xuxa including the Estimated Vat Tax Incentive is US$131.6 M. The total CAPEX already disbursed during construction is US$20,700,000 with US$ 110,900,545 of CAPEX remining.

 

The total CAPEX for Barreiro including the Estimated Vat Tax Incentive is US$75.7 M.

 

The CAPEX estimate has an accuracy of ±25% and is summarized in Table 25-1 (Xuxa) and Table 25-2 (Barreiro).

21501-REP-PM-001
Page | 480

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Table 25-1 – CAPEX Summary Xuxa

 

AREA TOTALS
  (USD)
  DIRECTS + INDIRECTS CONTINGENCY TOTAL
  (USD) (USD) (USD)
001 Mine 7,856,938 604,984 8,461,922
002 Plant 64,841,255 4,992,777 69,834,032
003 Environmental 15,387,006 1,184,799 16,571,805
004 EPCM & Engineering Services 17,867,543 1,375,801 19,243,344
005 Substation and Utility Power Supply 6,888,863 530,442 7,419,305
Total Construction Capital Cost 112,841,604 8,688,804 121,530,408
006 Owner’s Project Costs 8,901,677 890,168 9,791,844
007 Working Capital and Spares 6,137,293 6,137,293
Total Construction Capital Cost (ex VAT Tax Incentive) 127,880,574 9,578,971 137,459,545
009 Estimated VAT Tax Incentive (5,859,000) (5,859,000)
Total Construction Capital Cost 122,021,574 9,578,971 131,600,545
       
008 Sustaining and Deferred Capital 3,200,000 246,400 3,446,400

 

Table 25-2: CAPEX Summary Barreiro

 

AREA TOTALS
(USD)
PROCESSING PLANT DIRECTS + INDIRECTS CONTINGENCY TOTAL
(USD) (USD) (USD)
     
001 Mine 2,096,208 161,408 2,257,616
002 Plant 50,056,062 3,854,317 53,910,379
003 Environmental 6,747,201 519,534 7,266,735
004 EPCM & Engineering Services 10,726,444 825,936 11,552,380
005 Substation and Utility Power Supply – 
006 Owner’s Project Costs 3,000,000 231,000 3,231,000
007 Working Capital and Spares 937,293 72,172 1,009,465
Total Construction Capital Cost (VAT Tax Incentive) 73,563,208 5,664,367 79,227,575
008 Estimated VAT Tax Incentive (3,500,000) (3,500,000)
Total Construction Capital Cost (VAT Tax Incentive) 70,063,208 5,664,367 75,727,575
       
008 Sustaining and Deferred Capital 7,070,000 544,390 7,614,390

 

Note: The Barreiro substation costs are included in the Xuxa CAPEX estimate

 

25.1.9Operating Cost Summary

 

The processing plant operating cost estimate includes the operation of a three-stage crushing and screening circuit and DMS circuits (two stages for coarse, fine and ultra fines material classes).

 

The processing OPEX includes operating and maintenance labour, power, fuel and indirect charges associated with the processing plant. Based on these cost assumptions, inclusions and exclusions, it is estimated that the OPEX for the Xuxa concentrator will be $10.20/t of ore feed (or $55.73/t of spodumene concentrate produced). The estimated OPEX for the Barreiro concentrator is $8.40/t of ore feed (or $58.40/t of spodumene concentrate produced).

21501-REP-PM-001
Page | 481

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Is it worth noting that General and Administration (G&A) costs to manage the site (including the two concentrators) has been accounted for into the Xuxa concentrator OPEX exercise, which explains the majority of the cost difference between to two processing plants.

 

Operating cost estimates are summarized in Table 25-3 (Xuxa) and Table 25-4 (Barreiro)

 

Table 25-3 – Xuxa Operating Cost Estimate Summary

 

DESCRIPTION OPEX US$/ t ore
feed
Mine 35.8
Process 10.2
G&A 3.3
Shipping 21.7
TOTAL 70.9

 

Table 25-4: Barreiro Operating Cost Estimate Summary

 

DESCRIPTION OPEX US$/ t ore
feed
Mining 27.9
Process 8.4
G&A 4.3
Shipping 15.9
TOTAL 56.5

 

25.2Risk Evaluation

 

Risk assessment sessions were conducted individually and collectively by all parties.

 

Most aspects of the project are well defined. The risks are grouped by licensing, cost (CAPEX and OPEX), schedule, operations, markets and social/environmental categories. One of the most significant risks identified for the Project is related to lithium markets.

 

The following risks are highlighted for the project:

 

·Lithium market sale price and demand (commercial trends)

·Delay in receiving the Environmental Operation License

·Delay in obtaining the power permit and CEMIG substation energization: impact on plant start-up date

·Delay in obtaining the license for Barreiro Pit

·Fluctuations in the exchange rate and inflation

·Labour strikes at the Port and at site (construction and operation)

·Tax exemptions and import not confirmed

·Increased demands from the local community once in operation

·More fines generated from mining and crushing: potential negative impact on recovery

21501-REP-PM-001
Page | 482

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

·The production rate and size of the pit may impose challenges for operations

·Waste generation: the continuous geotechnical monitoring system to be implemented during mining operation can indicate local changes to geotechnical parameters, and potential increase of waste

  

25.3Opportunities

 

The following opportunities are identified for the Grota do Cirilo project:

 

·Recovery of Li2O from hypofines with a flotation circuit

·Recovery of Li2O from petalite

·Sale of plant rejects to the ceramics industry

·Potential upgrading of some or all of the Inferred Mineral Resources to higher-confidence categories and eventually conversion to Mineral Reserves

·Potential for future underground mining at both Phase 1 and Phase 2 projects.

·Exchange rate may work in the Project’s favour.

21501-REP-PM-001
Page | 483

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

26RECOMMENDATIONS

 

The following summarizes the recommendations from the Xuxa DFS and Barreiro PFS. A phased work program is planned, which consists of continued exploration over the known pegmatites in the Grota do Cirilo area, together with the implementation of the recommendations of Xuxa feasibility study and the Barreiro project PFS recommendations.

 

It is important to note that the recommendations for the different projects can be conducted concurrently.

 

26.1Geology and Resources

 

The overall cost for the drill program is estimated at US$6.6M and consists of a 26,600 m drill program to test the Xuxa, Barreiro, Nezinho do Chicao, and Murial areas. This is not included as a project cost.

 

Sigma intends to continue its infill and exploration evaluation of the pegmatites within the Grota do Cirilo area with a 36,000 m drill program as follows:

 

·Xuxa: 4,400 m to potentially support expansion of the Mineral Resource at depth, and potentially support category upgrades

·Barreiro: infill drilling, and step-out drilling to the north, 9,600 m

·Nezinho do Chicao infill and step-out drilling to the west: 5,200 m

·Murial: step-out drilling to the north, 4,400 m

 

Drilling will be completed with HQ size core tools with total depths between 150–500 m. Core sampling will be conducted on 1 m intervals. The all-in program costs, including drilling, logging, and assays, is estimated at US$250/m.

 

26.2Xuxa

 

The recommendations for Xuxa will be implemented in the project execution phase, prior to commencement of operations, and are estimated to be a total of US$1,275,000, consisting of:

 

·Mine design (implement a grade control program; evaluate underground mining potential for below the open pit levels of the mine, conduct a reserve study for underground mining; implement geotechnical monitoring system): US$345,000

·Implement best practice for mine drill and blast process to minimize fines generation which will have a negative impact on the process plant: Sigma has sourced expertise: no additional cost.

 

26.2.1Recommendations – Processing Plant

 

The following activities are recommended:

 

·Redesign of the re-recrush circuit to remove the pumping of coarse material by transferring the material to a separate conveyor belt system.

 

26.2.2Recommendations - Mining

 

Mining recommendations include:

 

·Implement grade control program including procedures, drilling and software: estimated cost US$110,000

21501-REP-PM-001
Page | 484

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

·Plan and implement a robust reconciliation system, in addition to grade control program, including plant feed sampling procedures, software reporting system development: estimated cost US$ 40,000

·Conduct a conceptual scoping level study (PEA) for potential underground mining of the remaining resource including inferred resources located under the open pit, to define the open pit/underground mine limit to allow the development of a geotechnical campaign program to support future underground mine project: estimated cost US$300,000

 

26.3Barreiro Project Recommendations

 

Based on the results of the Barreiro PFS, the QPs recommend that the Company proceed to completing a definitive feasibility study (DFS) in respect of the Barreiro deposit.

 

26.3.1Engineering Recommendations

 

The recommendations for Barreiro should be implemented in the project execution phase, prior to commencement of operations, and are estimated to be a total of US$140,000, consisting of:

 

·Complete studies relating to mine and waste heap geotechnics and hydrogeology considering geotechnical borehole complementation, borehole geotechnical relogging and televiewer program. Estimated cost US$50,000

·Develop an executive project for the Barreiro Waste pile. Estimated cost US$ 25,000

·Develop an executive project for a Barreiro ROM PAD including a crushing and screening station and a fines deposit in waste deposit or separately. Estimated cost US$ 25,000

·Review the mining project by updating the geotechnical parameters and considering a stockpile option to optimize the grade fed in beneficiation plant. Estimated cost US$ 40,000

 

26.4Nezinho do Chicao Project Recommendations

 

Based on the results of the Barreiro Maiden Resource Estimate, the QPs recommend that the Company proceed to completing a preliminary Economic Assessment (PEA) in respect of the NDC deposit.

 

26.4.1Geology Recommendations

 

The recommendations for NDC should be implemented an infill drilling program to convert Inferred resources to Indicated resources and add resource at depth, and are estimated to be a total of US$800,000, consisting of:

 

·3,200m of shallow and deep drilling to convert resource before the PFS. Estimated cost US$500,000

·2,000m of step-up drilling on the west side of the river to test the lateral extension of the deposit. Estimated cost US$300,000.

21501-REP-PM-001
Page | 485

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

27REFERENCES

 

Behre Dolbear, (2018): Competent Person’s Report, Greenbushes Lithium Mine, Western Australia: 15 August, 2018, 148 p.

 

Bilal, E., Horn, AH., and Machado de Melo, M (2012): P-Li-Be Bearing Pegmatite of the South-East Brazil, International Journal of Geosciences, Vol. 3, pp.281-288.

 

Bonàs, T. B. (2017): Mineral Resource Diligence Xuxa Sector, Sigma Internal Documentation, 11 p.

 

Bradley D., and McCauley A., (2013): A Preliminary Deposit Model for Lithium-Cesium-Tantalum (LCT) Pegmatites: U.S. Geological Survey, Open-File Report 2013–1008 Version 1.1, December 2016.

 

FMC, (2018): BMO Global Metals and Mining Conference: February 27, 2018, 15 p.

 

Harpia Consultoria Ambiental, (2019), Environmental Regularization Summary – Xuxa Project’’ (DNPM 824 692 71, 2019).

 

Gibson, C., Aghamirian, M., and Grammatikopoulos, T., (2017): A Review: The Beneficiation of Lithium Minerals from Hard Rock Deposits: SME Annual Meeting, Feb. 19- 2, 2017, Denver, CO, Preprint 17-003

 

Grammatikopoulos, T., (2018): The Mineralogical Characteristic of a Composite Sample from a Lithium Project, Brazil, SGS internal report, 89 p.

 

Johnston, G., and Baker. M., (2002): Araçuaí Tantalum Prospect Exploration Review, SRK private report, UK, 41 p.

 

Lefosse Advogados (2019), Sigma Legal Opinion – SUDENE and RECAP Tax Incentives: 25 March 2019.

 

London, D., (1984): Experimental Phase Equilibria in the System LiAlSiO4- SiO2-H2O; a Petrogenetic Grid for Lithium-rich Pegmatites, American Mineralogist, 69(11-12), pp. 995-1004

 

José de Castro Paes, V., (2017): Assessment of the Lithium Potential in Brazil: Geological Survey of Brazil PowerPoint presentation, 23 p.

 

Pedrosa-Soares, A., De Campos, C., Noce, C., and Alkmim, F. (2011): Late Neoproterozoic- Cambrian Granitic Magmatism in the Araçuaí Orogen (Brazil), The Eastern Brazilian Pegmatite Province and Related Mineral Resources, Geological Society London Special Publications, Vol. 350, pp.25-51.

 

Pedrosa-Soares, A., Chavez, M., Scholz, R (2009): Field Trip Guide Eastern Brazilian Pegmatite Provinces, 4th International Symposium on Granitic Pegmatite, 28 p.

 

Quemeneur, J., and Lagache, M., (1999): Comparative Study of Two Pegmatitic Field from Minas Gerais, Brazil, using the Rb and Cs Contents of Mica and Feldspars, Revista Brasileira de Geociencias, No. 29, Vol. 1. pp.27-32.

 

Rose, S and Fahey, G, 2014. Effective grade control systems, in Mineral Resource and Ore Reserve Estimation – The AusIMM Guide to Good Practice, second edition, pp 679-684. The Australasian Institute of Mining and Metallurgy: Melbourne.

 

Roskill Consulting Group Ltd, (2019): Spodumene Price Forecast for Xuxa DFS: report prepared by Roskill Consulting Group Ltd for Sigma, March 29, 2019

 

Sigma Lithium Resources Inc. (2019): Sigma Lithium Triples Measured and Indicated Mineral Resources at Grota do Cirilo, news release 10 January 2019, 7 p.

 

Sigma Mineração SA, (2017): Developing World-Class Potential. Hard Rock Lithium in Brazil, corporate presentation, 31 p.

21501-REP-PM-001
Page | 486

 

NI 43-101 TECHNICAL REPORT

GROTA DO CIRILO LITHIUM PROJECT

 

 

Slade, C., Neuhoff, L., Zan, I., and Pogorelev, M. (2014): Arqueana Mineração – Exploration Report, Sigma Internal documentation, 48 p.

 

Tan. T.S. (2003): Characterisation and Engineering Properties of Natural Soils. Volume 2, CRC Press, 1531p.

 

Tassos, G. (2018): The Mineralogical Characteristic of a Composite Sample from a Lithium Project, Brazil, SGS internal report, 89p.

 

Viana, R.R., Manttari, I., Kunst, H., and Jordt-Evangelista, H., (2003): Age of Pegmatites from Eastern Brazil and Implication of Mica Intergrowths on Cooling Rates and Age Calculation, Journal of South American Earth Sciences, Vol. 16, pp.493-501.

 

Aghamirian, Massoud, (2018), Scoping Study and Preliminary Lithium Flowsheet Development for The Sigma Lithium Deposit (Report number: 16193-001, June 5, 2018).

21501-REP-PM-001
Page | 487