EX-99.124 4 exhibit99-124.htm EXHIBIT 99.124 Kirkland Lake Gold Ltd. - Exhibit 99.124 - Filed by newsfilecorp.com

 



Holt-Holloway Property
Updated NI 43-101 Technical report
 

Important Notice

This Technical Report has been prepared as a National Instrument 43-101 Technical Report, as prescribed in Canadian Securities Administrators’ National Instrument 43-101, Standards of Disclosure for Mineral Projects (NI 43-101) for Kirkland Lake Gold Ltd. (Kirkland Lake Gold). The data, information, estimates, conclusions and recommendations contained herein, as prepared and presented by the Authors, are consistent with: the information available at the time of preparation; the data supplied by outside sources, which has been verified by the authors as applicable; and the assumptions, conditions and qualifications set forth in this Technical Report.

 

Cautionary Note with Respect to Forward-Looking Information

Certain information and statements contained in this Technical Report are “forward looking” in nature. All information and statements in this report, other than statements of historical fact, that address events, results, outcomes or developments that Kirkland Lake Gold Ltd. and/or the Qualified Persons who authored this report expect to occur are “forward-looking statements”. Forward looking statements are statements that are not historical facts and are generally, but not always, identified by the use of forward-looking terminology such as “plans”, “expects”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, “projects”, “potential”, “believes” or variations of such words and phrases or statements that certain actions, events or results “may”, “could”, “would”, “should”, “might” or “will be taken”, “occur” or “be achieved” or the negative connotation of such terms.

Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause actual results, performance or achievements to be materially different from any of its future results, performance or achievements expressed or implied by forward-looking statements. These risks, uncertainties and other factors include, but are not limited to, assumptions and parameters underlying the life of mine update not being realized, a decrease in the future gold price, discrepancies between actual and estimated production, changes in costs (including labour, supplies, fuel and equipment), changes to tax rates; environmental compliance and changes in environmental legislation and regulation, exchange rate fluctuations, general economic conditions and other risks involved in the gold exploration and development industry, as well as those risk factors discussed in the technical report. Such forward-looking statements are also based on a number of assumptions which may prove to be incorrect, including, but not limited to, assumptions about the following: the availability of financing for exploration and development activities; operating and capital costs; the Company’s ability to attract and retain skilled staff; sensitivity to metal prices and other sensitivities; the supply and demand for, and the level and volatility of the price of, gold; the supply and availability of consumables and services; the exchange rates of the Canadian dollar to the U.S. dollar; energy and fuel costs; the accuracy of reserve and resource estimates and the assumptions on which the reserve and resource estimates are based; market competition; ongoing relations with employees and impacted communities and general business and economic conditions. Accordingly, readers should not place undue reliance on forward-looking statements. The forward-looking statements contained herein are made as of the date hereof, or such other date or dates specified in such statements.

All forward-looking statements in this Technical Report are necessarily based on opinions and estimates made as of the date such statements are made and are subject to important risk factors and uncertainties, many of which cannot be controlled or predicted. Kirkland Lake Gold Ltd. and the Qualified Persons who authored this report undertake no obligation to update publicly or otherwise revise any forward-looking statements contained herein whether as a result of new information or future events or otherwise, except as may be required by law.

Page | ii


Holt-Holloway Property
Updated NI 43-101 Technical report

Non-IFRS Financial Performance Measures

Kirkland Lake Gold has included a non-IFRS measure “total site costs”, “total site costs per ounce” and various unit costs in this Technical Report. The Company believes that these measures, in addition to conventional measures prepared in accordance with IFRS, provide investors an improved ability to evaluate the underlying performance of the Company. The non-IFRS measures are intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. These measures do not have any standardized meaning prescribed under IFRS, and therefore may not be comparable to other issuers.

Page | iii


Holt-Holloway Property
Updated NI 43-101 Technical report

C O N T E N T S

SUMMARY
     
1.0 INTRODUCTION 7
     
2.0 RELIANCE ON OTHER EXPERTS 9
     
3.0 PROPERTY DESCRIPTION AND LOCATION 10
  3.1 Location 10
  3.2 Mineral Tenure and Encumbrances 11
  3.3 Permit Status 14
  3.4 Environmental Liability and Other Potential Risks 16
     
4.0 ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND PHYSIOGRAPHY 17
  4.1 Climate, Topography and Physiography 17
  4.2 Means of Access to the Property 17
  4.3 Infrastructure and Local Resources 18
     
5.0 HISTORY 19
  5.1 Holt Property Prior Ownership 19
  5.2 Holloway Property Prior Ownership 19
  5.3 Historical Mineral Resources and Mineral Reserves 20
  5.4 Exploration and Development Work on the Holt-Holloway Property 25
  5.5 Historical Production from the Property 26
     
6.0 GEOLOGICAL SETTINGS AND MINERALIZATION 28
  6.1 Regional Geology 28
  6.2 Local and Property Geology 29
  6.2.1 Local Geology 29
  6.2.2 Holt Property Geology 31
  6.2.3 Holloway Property Geology 31
     
7.0 DEPOSIT TYPE 32
  7.1.1 Holt 32
  7.1.2 Holloway 37
     
8.0 EXPLORATION 39
  8.1 Mine Area 39
  8.2 Within and Immediately Adjacent to Previously Discovered Areas 40
  8.2.1 Lightval 40
  8.2.2 Harker Newmex / TBone 41
  8.2.3 Deep Thunder / Canamax 42
  8.2.4 Sediment Zone 42
  8.3 Generative Targets Compilation and Evaluation 42
  8.4 2016-2017 Exploration Programs 43
  8.4.1 Holt-Holloway Mines 43
  8.4.2 Tousignant Trend 44
  8.4.3 Howey Cochenour / Coin Trend 45
  8.4.4 Harker Newmex / TBone 45
     
9.0 DRILLING 47
     
10.0 SAMPLE PREPARATION, ANALYSES AND SECURITY 48
  10.1 Sampling Methods 48
  10.2 QC/QA Comparative Assay Laboratory Program. 50
  10.3 QC/QA Holt Assay Lab 52
  10.4 Assay Laboratory Site Audits 52
     
11.0 DATA VERIFICATION 54
     
12.0 MINERAL PROCESSING AND METALLURGICAL TESTING 55
  12.1 Metallurgical Testing 55
  12.2 Mineral Processing 57
  12.2.1 Holloway Mine Ore 57

Page | iv


Holt-Holloway Property
Updated NI 43-101 Technical report

  12.2.2 Holt Mine Ore 57
     
13.0 MINERAL RESOURCE ESTIMATES 59
  13.1 Database 59
  13.2 Geological Interpretation and 3D Solid Modelling 60
  13.3 Density Data 60
  13.4 Assay Composites 60
  13.5 Assay Statistics 61
  13.6 Semi-Variograms 63
  13.7 Block Model 66
  13.8 Grade Interpolation 67
  13.9 Model Checks 68
  13.10 Resource Estimate and Classification 69
     
14.0 MINERAL RESERVES ESTIMATE 70
     
15.0 MINING METHODS 71
  15.1 Holt 71
  15.1.1 Design Criteria 71
  15.1.2 Mining Shapes 73
  15.1.3 Mining Method 74
  15.1.4 Geomechanical 78
  15.1.5 Mine Access and Development 80
  15.1.6 Capital Development 82
  15.1.7 Operating Development 82
  15.1.8 Equipment 83
  15.1.9 Production Rate and Life of Mine Plan 85
  15.2 Holloway 85
     
16.0 RECOVERY METHODS 87
  16.1 Process Plant Flow Sheet 87
     
17.0 PROJECT INFRASTRUCTURE 90
  17.1 HOLT 90
  17.1.1 Surface Buildings 90
  17.1.2 Road Upgrade and Ore Transportation 91
  17.1.3 Power 91
  17.1.4 Underground Mine Dewatering and Fresh Water Requirements-pierre to check 92
  17.1.5 Underground Mine Ventilation 92
  17.1.6 Underground Material Handling 93
  17.1.7 Communications 94
  17.2 HOLLOWAY 94
     
18.0 MARKET STUDIES AND CONTRACTS 95
  18.1 Market for the Product 95
  18.2 Material Contracts 95
     
19.0 ENVIRONMENTAL STUDIES, PERMITTING, AND SOCIAL OR COMMUNITY IMPACT 96
  19.1 Summary of Environmental Studies 96
  19.1.1 Terrestrial Environment 96
  19.1.2 Hydrogeological Characterization 96
  19.1.3 Hydrological and Aquatic Habitat Assessments 99
  19.1.4 Waste Characterization Studies 99
  19.2 Tailing Management Plan 100
  19.3 Permits Status and Posted Bonds 100
  19.4 Social and Community 101
  19.5 Closure Plan 101
     
20.0 CAPITAL AND OPERATING COSTS 102
  20.1 Capital Costs 102
  20.1.1 Basis of Estimate 102
  20.1.2 Cost Estimate 102
  20.2 Operating Costs 103

Page | v


Holt-Holloway Property
Updated NI 43-101 Technical report


T A B L E S

Table 1-1: List of abbreviations. 8
Table 3-1: Royalties sliding-scale by property (includes most significant royalties only). 12
Table 3-2: List of Permits. 15
Table 5-1: Holt-Holloway mineral resources, as of April 30, 2006 (After SWRPA, 2008). 21
Table 5-2: Holt mineral historical resource estimate, as of 2008 (After SWRPA, 2008). 22
Table 5-3: Holt-Holloway historical mineral reserves estimate, as of 2008. 23
Table 5-4: Holt Mine Mineral Resource Estimate 2014-2016, as of December 31, 2016. 24
Table 5-5: Holloway Mine Mineral Resource Estimate 2014-2016, as of December 31, 2016 24
Table 5-6: Holt-Holloway Property historical production. 27
Table 12-1: Recent metallurgical test work on Holloway ore. 56
Table 12-2: Metallurgical standard leach test results. 56
Table 12-3: Mineral processing statistics for the Holloway ore (since 2009) 57
Table 12-4: Mineral processing statistics for the Holt ore (since 2010). 58
Table 13-1: Mineral Resources for the Holt and Holloway properties (as of Dec 31, 2016). 59
Table 13-2: Capped and uncapped models for Zone 4 “upper” and “east”. 63
Table 13-3: Semi-variogram model parameters. 65
Table 13-4: Block model set-up parameters. 66
Table 13-5: Parameters for grade interpolation for all zones 68
Table 14-1: Mineral reserves for the Holt and Holloway properties (as of Dec 31, 2016). 70
Table 15-1: Holt Mine development requirements. 81
Table 15-2: Tousignant Zone. 81
Table 15-3: Capital development at Holt Mine 82
Table 15-4: Capital development at Tousignant. 82
Table 15-5: Operating development at Holt Mine. 82
Table 15-6: Operating development at Tousignant. 82
Table 15-7: Major mobile equipment at Holt. 84
Table 15-8: Holt Mine LOM plan. 85
Table 15-9: Tousignant Zone LOM plan. 85
Table 16-1: Details of the grinding circuit 88
Table 17-1: Primary ventilation system at the Holt Mine. 93
Table 20-1: LOM capital expenditures breakdown for the Holt Mine 102
Table 20-2: Holt Mine operating unit cost breakdown. 103

Page | vi


Holt-Holloway Property
Updated NI 43-101 Technical report

F I G U R E S

Figure 3-1: Location map. 10
Figure 3-2: Group of properties map 13
Figure 3-3: Claims location map. 14
Figure 6-1: Holt and Holloway mines regional geology. 29
Figure 6-2: Holt and Holloway properties geology (cross sectional view, looking west). 30
Figure 7-1: Vertical Longitudinal section of the Holt Mine Complex. 34
Figure 7-2: Cascade Deposit and Card Claims relative to Holt Zone 4 West (plan view). 36
Figure 7-3: Longitudinal View of the Holloway Deposit (looking North) 37
Figure 8-1: Vertical longitudinal section of Holt near mine targets 40
Figure 8-2: Vertical longitudinal section of Holloway near mine targets. 40
Figure 8-3: 2016 VTEM survey results. 43
Figure 8-4: Plan view of exploration targets near the Holt Mine Complex 44
Figure 8-5: Zone 4/Tousignant West longitudinal section showing recent drill results. 45
Figure 8-6: Harker West/Newmex target location plan showing prospective target areas. 46
Figure 10-1: Reject samples lab comparison between Lab Expert and Bureau Veritas. 51
Figure 10-2: Pulp samples lab comparison between Lab Expert and Bureau Veritas. 52
Figure 13-1: Au probability plots for Zone 4 (upper and east). 62
Figure 13-2: Au probability plots for Zone 4 (lower), C-95, C97 and C-99. 63
Figure 13-3: Anisotropic semi-variogram for Zone 4 (upper and east). 64
Figure 13-4: Anisotropic semi-variogram for Zone 4 (lower), C-95, C-97 and C-99 65
Figure 15-1: Holt mine vertical longsection (looking North; without Tousignant Zone). 73
Figure 15-2: Typical Zone 4 long hole ring section view 75
Figure 15-3: Zone 6 isometric. 76
Figure 15-4: Zone 7 Reserve Lenses. 77
Figure 15-5: Ground support standard for ore headings at Holt mine. 79
Figure 15-6: Ground support standard for waste heading at Holt mine 80
Figure 16-1: Process flow sheet 89
Figure 17-1: Holt property surface general arrangement (After SWRPA, 2008). 91
Figure 19-1: Plan View of the TMF. 100

A P P E N D I C E S

Appendix A: Claim list. 116

Page | vii


SUMMARY

This National Instrument 43-101 technical report was triggered by the disclosure of the Annual Information Form (AIF) for the year 2016 (section 4.2 (1) (f) of the Instrument).

This technical report has been prepared for KLG, the beneficial owner of the Macassa Mine. KLG is listed on the Toronto Stock Exchange under the ticker symbol “KL”. This technical report provides the Mineral Resource and Mineral Reserve estimates for the Macassa Mine that have resulted from ongoing exploration and resource definition drilling and as a result of ongoing mine design and evaluation during the period January 1, 2016 to December 31, 2016

The Holloway-Holt property is located in northeastern Ontario, adjacent to the Quebec border. The property includes an irregularly shaped, east-west elongate assemblage of claims, patents, and mining leases that more or less straddles Ontario Provincial Highway 101 east for 40 km, beginning 32 km east of Matheson and extending to the Quebec border. The main assets, the adjacent Holt and Holloway mines, are centered approximately 45 km northeast of Kirkland Lake, 96 km northwest of Rouyn-Noranda, and 58 km by road east of Matheson. KLG completed the acquisition of SAS in January 2016.

The land package comprises 48 separate property groups package comprises 48 separate property groups totalling 559 claims distributed as 233 mineral claims, 135 leased claims, and 191 patented claims. The aggregate area is 11,528 ha. There are at least 16 different property agreements with individuals or corporate entities, the most significant one is with Franco-=Nevada Corporation. Titles to the leased and patented claims mostly include both surface and mineral rights. Included in the land package is the Holloway-Holt Mine and Mill complex and tailings facility.

KLG has recently signed an agreement with First Nations who have treaty and aboriginal rights which they assert within the operations area of the mine. The agreement provides a framework for strengthened collaboration in the development and operations of the mine and outlines tangible benefits for the First Nations, including skills training and employment, opportunities for business development and contracting, and a framework for issues resolution, regulatory permitting and KLG future financial contributions.

The Holloway and Holt mines lie within the Southern Abitibi Greenstone Belt (SAGB) of the Superior Province in north-eastern Ontario. The 40 km long, mostly contiguous Holt-Holloway property package is a grouping of strategically located claims straddling the Porcupine-Destor

Fault Zone (“PDF”) midway along its 260 km length. The defining structural characteristic of the property package and the most important feature from an economic geology viewpoint is the PDF, around which a multitude of gold showings and prospects are clustered. The Holloway and Holt mines are located opposite each other, approximately one kilometre apart, on the north and south sides of the PDF, respectively.

Page | 1


Holt-Holloway Property
Updated NI 43-101 Technical report

Gold mineralization at the Holt and Holloway mines comprises replacement carbonate-pyrite-albite-quartz alteration that overprints mafic volcanic rocks in, and adjacent to, D3-D4 high strain zones.

The exploration potential on the Holt-Holloway property can be divided into three equally prospective areas:

  • Within the immediate mine areas, typically strike and dip extensions;

  • Within and immediately adjacent to the gold mineralization previously discovered, namely at Holloway on the Lightning Deep, Blacktop, Canamax and Seagar Hill property segments and at Holt on the Zone 4 west extension, V-93 (vertical extension) and McKenna zones; and,

  • In new areas where conceptual exploration targets have been generated based on both past and recent theories that predict the controls on the location of gold mineralization. Holloway mineralized plunge junction, west of Tousignant, and associated with the Howey-Cochenour trend.

Throughout 2016, exploration in the vicinity of the Holloway-Holt mines continues to be a priority, in order to identify and replenish mineral resources. Recent exploration programs were focused at Holt Deep Zone 4 West Extension, at Lightning Deep, and at Canamax / Deep Thunder.

In 2017, exploration programs will search for mineralization further away (over 3 km away) from the Holloway-Holt operations. Approximately 22.2 km of exploration drilling will focus on evaluating the mineralized limits for the West Tousignant/ Harker West and on continuing to evaluate the Howey Cochenour – Coin / Phoenix Fault trend on the Holt property.

Operations at the Holloway Mine were suspended at the end of 2016; an aggressive exploration programme is planned for 2017.

The Holt Mine is accessed by a single shaft, which extends to a depth of 1,195 m from surface. It has three compartments from surface to the 350 m level and four compartments to the 1,195 m level. The shaft has been deepened on several occasions. The shaft is rectangular and has timber sets and guides.

Access to planned mining areas is gained from the four main rail haulage levels: 435, 775, 925 and 1075 levels. The rail haulage drifts were developed 3 m wide by 3 m high, making access between mining zones with large equipment a difficult task. An existing main ramp system is located within the C-104 Zone and extends from 650 level to 1062 level. Sublevel accesses from the main ramp were developed by previous owners at vertical intervals of 20 m. The main ramp has shaft access on four levels: 650, 700, 775 and 925 levels. The 1075 main haulage level is connected to the main ramp system via a 2 m by 2 m raise from the 1062 level and through an internal ramp in Zone 4. A ramp system was also developed by previous owners in the C-97 zone. The C-97 ramp consists of two ramps: one is a decline from the 925 main haulage and extends to the 970 level, the other is an incline extending from 1075 level to 1010 level. For both ramp systems, there is no connection between the 1075 haulage level and the haulage levels above.

Page | 2


Holt-Holloway Property
Updated NI 43-101 Technical report

An internal ramp system has been developed in Zone 4 from the 925 haulage level and the 1075 haulage level. The Zone 4 ramp below 1075 level will be mined to accommodate 30 tonne trucks for reserve extraction. The internal ramp system established in Zone 6 connects 775 level to 610 level for the upper portion and is planned to connect the 925 and 775 haulage levels for the lower portion. The system will not include a connection between 1075 level and the haulage levels above.

The Tousignant Zone is planned to be accessed via a portal and decline ramp, which will be located approximately 3 km west of the Holt shaft. A main ramp is planned to be developed in ore through lens 1 to access mining areas and in lens 2, thus minimizing development costs. Mining will retreat from the deeper area (i.e. lens 2) to the shallower area (i.e. lens 1), progressively losing the ramp access to the bottom area

The primary stoping method at the Holt Mine is mechanised long hole drilling and blasting within the mining blocks with rail transport to the shaft ore passes. The spacing between sublevels for long hole stoping varies between 20 m and 17 m, depending on the dip of the ore. Mechanized long hole stoping is planned to be used in all zones at the Holt mine. “Drift and pillar” stoping may be needed in some areas where the ore is too shallow and not amenable to long hole methods. Drilling is performed with top-hammer drills, with hole sizes ranging from 64 mm to 76 mm in diameter. The Tousignant Zone is planned to be mined with modified room and pillar.

The updated mineral resources and mineral reserves (as of December 31, 2016) are presented in Summary Table 1 and Summary Table 2 respectively.

Page | 3


Holt-Holloway Property
Updated NI 43-101 Technical report

Notes
CIM definitions (2014) were followed in the calculation of Mineral Resource
Mineral Resources are reported Exclusive of Reserves
Mineral Resource estimates were prepared under the supervision of D. Cater, P. Geo.
Mineral Resources were estimated at a block cut-off grade of 2.5 g/t and 2.9 g/t depending on zone
Mineral Resources are estimated using a long term gold price of US$1,200/oz (CDN$1,500/oz)
A minimum mining width of 3m was applied
A bulk density of 2.84 t/m3 was used
Totals may not add exactly due to rounding

Summary Table 1: Mineral resources at Holt and Holloway mines (as of Dec 31, 2016).

  PROVEN PROBABLE PROVEN AND PROBABLE
  Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces
  (kt) (g/t) (koz) (kt) (g/t) (koz) (kt) (g/t) (koz)
HOLT 1,450 4.2 194 2,500 4.7 376 3,950 4.5 570
HOLLOWAY 0 0.0 0 57 5.7 10 57 5.7 10
Total 1,450 4.20 194 2,560 4.7 387 4,001 4.5 581

Notes
CIM definitions (2014) were followed in the estimation of Mineral Reserves.
Cut-off grades were calculated for each stope
Mineral Reserves were estimated using a long term gold price of US$1,200/oz (CDN$1,500/oz)
Mineral Reserves estimates were prepared under the supervision of P. Rocque, P. Eng.
Totals may not add exactly due to rounding

Summary Table 2: Mineral reserves at Holt and Holloway mines (as of Dec 31, 2016).

The general consensus from an exploration perspective is that many of the mineral deposits at the Holt- Holloway property remain open or poorly drill tested along strike and dip and therefore they offer excellent potential for both surface and underground exploration programs. One sign of a robust project or mine is its ability to replenish and grow its mineral resources and mineral reserves. This has been the case at Holt and Holloway since operations were re-started in 2009-2010. Main opportunities at the Holt and Holloway mine are as follows:

Page | 4


Holt-Holloway Property
Updated NI 43-101 Technical report

  • Significant mineralized Extensions to Zone 4, Worvest, Tousignant and Cascade to the west at Holt, and extensions of the Lightning Deep, and Sediment zone to the east at Holloway;

  • Significant increase in mineralized extensions of zone 6, Zone 7, C97, C104 mineral zones. These sub-vertical tabular zones are structurally associated with the Ghostmount Fault zone;

  • Reduction or re-negotiation of the underlying production royalties;

  • Increase in production rate by de-bottlenecking the ore flow system at Holt;

Risks that could be present at the operation are summarized as follows:

  • Future exploration programs are unable to keep pace with mining that in turn results in mineral resources and mineral reserves being depleted;

  • Mechanical breakdown of critical equipment (hoist, conveyance, mill, etc.) or infrastructure that could decrease or halt the production throughput at the mine;

A number of recommendations arising from the Technical Report are as follows:

  • Advancement of the 1075 level to the west is required to facilitate definition drilling of the Zone 4 western extensions. Creation of underground drill platforms to test for the strike extension of V-93 and down-dip extension of Zone 6 mineralization.

  • Work to standardize mine grids (local mine grids Holt-Holloway vs. UTM grids);

  • Follow-up on SRK’s and Rhys’ report recommendations. The key recommendation being the exploration for repetitions of mineral deposits at Holloway;

  • It is recommended to continue to develop the Holt mine by continually explore and define any potential zone surrounding the operations. It is believed that the land package near the mines is hosting a number of superior exploration targets, namely at Cascade and Tousignant West.

Page | 5


Holt-Holloway Property
Updated NI 43-101 Technical report

  • The technical team on site should continue to optimize the LOM plan and complete technical studies on new and existing zones with a view to maximize profitability and minimize potential shortage of mill feed.

  • In 2017, the Company’s exploration efforts will continue to focus on identifying additional mineral resources near existing operations. KLG will also initiate “grass roots” exploration on high priority targets as identified by a recently completed VTEM heliborne MAG / EM survey, and based on compilations of targets currently in KLG’s extensive database. The 2017 exploration program, at a cost of $4.3M, consists primarily of core drilling, on targets situated to the west of the mine. More than 17% of the 2017 budget is planned for drilling on the Holt and Holloway properties.

Page | 6


Holt-Holloway Property
Updated NI 43-101 Technical report

1.0 INTRODUCTION
   

This National Instrument 43-101 technical report (technical report) was triggered by the disclosure from KLG of its Annual Information Form (AIF) for the year 2016 (section 4.2 (1) (f) of the Instrument).

   

This update from the 2014 technical report covers the changes in mineral resources and mineral reserves, mine design and life of mine plan pertaining to the Hislop deposit located in the Taylor Township, Ontario, Canada

   

The technical report was prepared by employees of KLG and under the supervision of Pierre Rocque, P. Eng. and Douglas Cater, P. Geo., both qualified persons (QP) who are not independent of KLG, as allowed under section 5.3 (3) of the Instrument.

   

Information was obtained through operation and technical work related to the Holt and Holloway mines over the past few years.

   
 

The two QPs frequently visited the Holt and Holloway mines throughout the year.

   

The units of measures used in this report conform to the metric system. Unless stated otherwise, the Canadian Dollar (CDN$) is the currency used in this technical report. A list of abbreviations is displayed in Table 1-1.

Page | 7


Holt-Holloway Property
Updated NI 43-101 Technical report

μ micron kVA kilovolt-amperes
°C degree Celsius kW kilowatt
°F degree Fahrenheit kWh kilowatt-hour
μg microgram L litre
A ampere L/s litres per second
a annum m metre
bbl barrels M mega (million)
Btu British thermal units m2 square metre
CDN$ Canadian dollars m3 cubic metre
cal calorie min minute
cfm cubic feet per minute MASL metres above sea level
cm centimetre mm millimetre
cm2 square centimetre mph miles per hour
d day MVA megavolt-amperes
dia. diameter MW megawatt
dmt dry metric tonne MWh megawatt-hour
dwt dead-weight ton m3 /h cubic metres per hour
ft foot opt, oz/st Troy ounce per short ton
ft/s foot per second oz Troy ounce (31.1035g)
ft2 square foot oz/dmt Troy ounce per dry metric tonne
ft3 cubic foot ppm part per million
g gram psia pound per square inch absolute
G giga (billion) psig pound per square inch gauge
Gal Imperial gallon RL relative elevation
g/L gram per litre s second
g/t gram per tonne st short ton
gpm Imperial gallons per minute stpa short ton per year
h hour stpd short ton per day
ha hectare t metric tonne
hp horsepower tpa metric tonne per year
in inch tpd metric tonne per day
in2 square inch US$ United States dollar
J joule USg United States gallon
k kilo (thousand) USgpm US gallon per minute
kcal kilocalorie V volt
kg kilogram W watt
km kilometre wmt wet metric tonne
km/h kilometre per hour yd3 cubic yard
km2 square kilometre yr year
kPa kilopascal    

Table 1-1: List of abbreviations.

Page | 8


Holt-Holloway Property
Updated NI 43-101 Technical report

2.0

RELIANCE ON OTHER EXPERTS

   

The QPs relied on the following people for non technical information:


 

Ryan Cox, Environmental Coordinator (section 3.3 and portions of section 19).

     
 

Alasdair Federico, Executive Vice President (section 4.3 and portions of section 19; community and First Nations).

Page | 9


Holt-Holloway Property
Updated NI 43-101 Technical report

3.0

PROPERTY DESCRIPTION AND LOCATION

   

The following sections are copied (and updated) from the previous technical report (Cater and Salehi, 2015). A summary is presented in the following sub-sections. No material changes occurred since the last technical report was filed in 2015.

   
3.1

Location

   

The Holloway-Holt property is located in northeastern Ontario, adjacent to the Quebec border (Figure 3-1). The property package involved stretches through NTS areas 42D9 and 42D12 and includes an irregularly shaped, east-west elongate assemblage of claims, patents, and mining leases that more or less straddles Ontario Provincial Highway 101 east for 40 km, beginning 32 km east of Matheson and extending to the Quebec border. The main assets, the adjacent Holt and Holloway mines, are centered approximately 45 km northeast of Kirkland Lake, 96 km northwest of Rouyn-Noranda, and 58 km by road east of Matheson. The UTM NAD83 coordinates for the Holloway headframe are 592,505 E and 5,374,929 N.

Page | 10


Holt-Holloway Property
Updated NI 43-101 Technical report

3.2

Mineral Tenure and Encumbrances

   

On November 1, 2006, St Andrew Goldfields Ltd. (SAS) purchased 100% of the shares of Holloway Mining Company, a wholly owned subsidiary of Newmont Canada Limited.

   

Holloway Mining Company’s assets consisted of the property, facilities and equipment of the Holloway Mine and the Holt Mine and Mill, including 48 separate property groups extending from eastern Marriott Township west into eastern Michaud and McCool townships in northeastern Ontario.

   

The land package comprises 48 separate property groups package comprises 48 separate property groups totalling 559 claims distributed as 233 mineral claims, 135 leased claims, and 191 patented claims. The aggregate area is 11,528 ha. There are at least 16 different property agreements with individuals or corporate entities. Titles to the leased and patented claims mostly include both surface and mineral rights. Included in the land package is the Holloway-Holt Mine and Mill complex and tailings facility.

   

Property groups and individual claims location are shown in Figure 3-2 and Figure 3-3. Details of the land tenure are listed in Appendix A. The claim list is a tabulation of the relevant claim information including claim group, township, claim number, parcel number, surface right (SR) or Mineral Right (MR) Owner, percentage owned, area (hectares), pin number and relevant royalty schedule.

   

The single most significant royalty is a sliding scale royalty on all production from the Holt and Holloway mines payable to Franco-Nevada (that was assigned by Newmont, the former owner, effective 2008). The royalty rates vary along a gold price sliding scale, as shown in Table 3-1.

   

An addendum to the royalty contract with Franco-Nevada Corporation, dated 10 November 2015, covers the development and production from Zone 7 (formerly referred to as “Ghost Zone”). The amended and re-stated agreement for Zone 7 states:


  The NSR will be 3% if the price of gold is less than US$1,400/oz;
     
  The NSR will be 10% if the price of gold equals or exceeds US$1,400/oz.

In the event where the operator (now KLG) fails to deliver (and process) 60,000 t from Zone 7 in a consecutive period of six months before December 31, 2018, then the original sliding scale royalty agreement will also cover the production from Zone 7.

Page | 11


Holt-Holloway Property
Updated NI 43-101 Technical report

Price of gold Holt Holloway
Less than US$500/oz 2% 2%
Less than US$600/oz 3% 2%
Less than US$700/oz 4% 2%
Less than US$800/oz 5% 2%
Less than US$900/oz 6% 3%
Less than US$1,000/oz 7% 4%
Less than US$1,100/oz 8% 5%
Less than US$1,200/oz 9% 6%
Less than US$1,300/oz 10% 7%
Less than US$1,400/oz 10% 8%
Less than US$1,500/oz 10% 9%
Less than US$1,600/oz 10% 10%
Less than US$1,700/oz 10% 11%
Less than US$1,800/oz 10% 12%
Less than US$1,900/oz 10% 13%
Less than US$2,000/oz 10% 14%
Less than US$2,100/oz 10% 15%
Over US$2,200/oz 10% 15%

Table 3-1: Royalties sliding-scale by property (includes most significant royalties only).

Page | 12


Holt-Holloway Property
Updated NI 43-101 Technical report

Figure 3-2: Group of properties map.

Page | 13


Holt-Holloway Property
Updated NI 43-101 Technical report

Figure 3-3: Claims location map.

   

All properties are maintained in good status and there are no encumbrances on the properties.

   
3.3

Permit Status

   

All permits and certificates are in good standing with the appropriate regulatory offices. Updates or modifications are performed in compliance with current legislation.

Page | 14


Holt-Holloway Property
Updated NI 43-101 Technical report

Agency Section Item Description Site Expiration Status
MOE 1 ECA # 3380-8JBGKZ Tailings Basin Shaft #3 N/A Active
MOE 2 CA # 7071501 Waste Disposal Site (WDS) Shaft #3 N/A Active
MOE 3 CA # A770114 Holt-McDermott Mine Dewatering Camp and Drill Water Shaft #2 N/A Active
MOE 4 CA # 4-0077-85-006 East Settling Pond Shaft #3 N/A Active
    CA # 4-0077-85-006 Rev.1 East Settling Pond Shaft #3 N/A Active
    CA # 4-0077-85-006 Notice 1 East Settling Pond Shaft #3 N/A Active
MOE 5 CA # 3-0013-87-958 Sewage Treatment Plant Shaft #3 N/A Active
    CA # 3-0013-87-958 Notice 1 Sewage Treatment Plant Shaft #3 N/A Active
MOE 6 CA # 4-0135-94-956 Mine Water Settling Pond Shaft #2   Active
MOE 7 Use Permit No. T-94-170 Raised Septic System Shaft #2 N/A Active
MOE 8 Use Permit No. M-92-13 Ten Man Camp and Kitchen Shaft #2 N/A Inactive
MOE 9 Use Permit No. M-92-14 Twenty Man Camp and Dry Shaft #2 N/A Inactive
MOE 10 CA # 70-0008-87-006 Potable Water Plant Shaft #3 N/A Active
MOE 11 CA# 7-0657-95-006 Potable Water Treatment System Shaft #2 N/A Active
MOE 12 CA #6148-6G8GMP Mine Ventilation System & Blacktop Exhaust Raise Shaft #2 - Active
MOE 13 CA # 3388-4U4KB7 Revoked Shaft #3 (Holt-McDermott Air Emission) Shaft #3 N/A Active
    CA # 5756-65ZNG7 Notice 1     Permit Pending  
MOE 14 CA # 8-5075-94-006 Service Building Ventilation Exhausts Shaft #2 N/A Active
MOE 15 CA# 8-6010-95-006 Diesel Engine for Fire Pump Shaft #2 N/A Active
MOE 16 CA # 8-6061-95-006 Mine Ventilation System Shaft #2 N/A Active
MOE 17 CA # 8-5085-93-957 Backfill Baghouse and Scrubbers Shaft #2 N/A Active
MOE 18 CA # 4518-4WRNJS Fire Equipment, Welding Exhausts, Diesel Generators Shaft #2 N/A Revoked
MOE 19 PTTW # 00-P-6063 Construction 2000 Shaft #3 Oct. 31/01 Inactive
    PTTW # 01-P-6013 Construction 2001   May 1/02 Inactive
MOE 20 PTTW #5261-6UXJKV Holt-McDermott Mine Dewatering Camp and Drill Water Shaft #3 Oct 27/16 Pending
MOE 21 PTTW # 7855-9JEKBC Mattawasaga & Holloway Lake Water Supply Shaft #3 Apr. 30/19 Active
MOE 22 PTTW # 5356-9JEKZN Holloway Mine Dewatering Shaft #2 Apr. 30/19 Active
MOE 23 PTTW # 2083-9JEKRH Potable Water Supply Shaft #3 Apr. 30/19 Active
MOE 24 PTTW # 8655-A4NSNJ Mine Dewatering and Diamond Drill Hole Shaft #2 Jan. 05/21 Active
MOE 25 PTTW # 1718-A4NSEJ Well #1 Shaft #2 Jan. 05/21 Active
MOE 26 PTTW # 2427-A4NS6N Well #2 Shaft #2 Jan. 05/21 Active
MOE 27 PTTW # 1068-A2FMTF West Mattawasaga Pit Shaft #3 Sept. 30/19 Active
MOE 28 MOE Letter Waste Registration Numbers Shaft #3 N/A Active
        On Line Registration for 2002/2003 HWIN         
MOE 29 Waste Generator Registration Generator No. ON2610201 Shaft #2 N/A Active
MOE 30 MOE Letter Magusi River Flow Calibration Shaft #3   Active
MOE 31 CA # 8-5025-92-006 Underground Backfill Shaft #3 N/A Active
TC 1 Transportation of Dangerous Good Registration TDG Registration Shaft #2 N/A Active
MNR 1 No. 15622 No. 33724 Aggregate Permit Shaft #3 Each Year End Dec. 31st Active
    No. 17950        
MNR 2 No. TM-KL-77 Plan and Specification Polishing Pond Expansion Shaft #3   Inactive
MNR 3 Permit # KLK-05-14 Fire Permit Shaft #2 & 3 Annual Active
MNR 4 Work Permit KL01-01 Construction 2001 Shaft #3 Mar. 31/02 Active
    Work Permit Construction 2002-2003   TBA  
DFO 1 Authorization and Amendment Polishing Pond Expansion Shaft #3 Oct. 1/05 Active
DFO 2 Sediment and Erosion Protection Acceptance Polishing Pond Expansion Shaft #3 N/A Inactive
AECB 1 No. 08957-1-09.1 Radioisotope License Shaft #3 Sept. 30/12 ? Active
MOL 1 T148 C, D,&E Hoist Permit Shaft #3 N/A Active
MOL 2 96047A&B, 96048U,J&K Explosive Magazines Shaft #3 N/A Active
MNDM 1 Closure Plan 2006 Director Acceptance Shaft #2 N/A Active
MNDM 2 Closure Plan 2006 Director Acceptance Shaft #3 N/A Active
MNDM 3 Closure Plan 2005 Director Acceptance Blacktop N/A Active

Table 3-2: List of Permits.

Page | 15


Holt-Holloway Property
Updated NI 43-101 Technical report

3.4

Environmental Liability and Other Potential Risks

   

In the Qualified Person’s (QP) opinion, there are no significant factors or risks that may affect access, title or the right or ability of KLG to perform work on the Holt-Holloway property.

Page | 16


Holt-Holloway Property
Updated NI 43-101 Technical report

4.0

ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND PHYSIOGRAPHY

   

The following sections are copied (and updated) from the previous technical report (Cater and Salehi, 2015). A summary is presented in the following sub-sections. No material changes occurred since the last technical report was filed in 2015.

   
4.1

Climate, Topography and Physiography

   

The climate of the area is typical of northern Ontario with cold winters, warm summers and only moderate precipitation. Climatic conditions in Timmins have been described based on meteorological information from Environment Canada (2010) during the period from 1971 to 2000. The average daily temperature in the Timmins area is recorded as 1.3°C with a daily average low of -17.5°C in the month of January, and a daily average high of 17.4°C in the month of July. An extreme low of -45.6°C was recorded on February 1st, 1962 and the extreme high of 38.9°C occurred on July 31st, 1975. The yearly average precipitation for the Timmins area is 831.3 mm with approximately 67% as rain and 33% as snow. The record daily amount of rainfall, 87.6 mm, occurred on July 29th, 1990 and the record daily amount of snowfall, 48.2 cm, occurred on March 19th, 1983.

   

All of the property is covered by flat lying to gently rolling terrain with average topographic relief of approximately 40 m. Overburden depths range for 3 to 60 m, with average overburden depth on the property ranging from 5 m to 10 m. Elevations range from approximately 200 m to 300 m above sea level. The area is reasonably well drained by creeks and small rivers, and there are numerous small swamps and marsh areas. Outcrop is limited due to an extensive blanket of overburden, mostly sand with lesser amounts of clay from the northerly trending Munro esker. The area is located within the Boreal Shield zone: tree cover is normally thick and predominantly coniferous (with black spruce and jack pine being the most common species), with lesser stands of poplar and birch. The current cover is believed to be a mix of second and third growth forest as a result of logging operations and forest fires.

   
4.2

Means of Access to the Property

   

The Holt-Holloway property is located in the District of Cochrane, 58 km east of Matheson on Ontario provincial highway 101 and 68 km by road northeast of Kirkland Lake via Ontario provincial highway 66 and Ontario provincial road 672. To reach the property from Toronto, there are daily scheduled flights to Timmins, which is 126 km by road west of the property. From Montreal, there are daily scheduled flights to Rouyn- Noranda, which is 96 km by road east of the property. Access to various parts of the property package can be achieved by various bush roads and logging roads that join Ontario provincial highway 101. In the summer months, these roads are normally passable. The Trans-Canada Highway (Highway 11) goes through the town of Matheson. The Holloway and Holt surface facilities are secured behind fenced and gated facilities. Twenty-four hour security service is provided with all personnel and visitors signed in and out of the facilities. Employee and visitor parking are provided outside the gated facilities.

Page | 17


Holt-Holloway Property
Updated NI 43-101 Technical report

4.3

Infrastructure and Local Resources

   

The infrastructure is well developed and can support mining activities in the area. Power, fuel sources and water are already available at the Holt-Holloway property. Water is plentiful in the area and can be sourced from rivers and small lakes. An electric power line connects the mine property to the provincial power grid connecting Kirkland Lake and Larder Lake. The area is well serviced with an array of major roads and two airports (in Timmins and Rouyn-Noranda). The ore is treated at the company’s Holt mill. Tailings are managed in four adjoining tailings ponds, two sludge precipitate pond, one water treatment/holding pond (pre-polishing), and one polishing pond, all located southeast of the milling facility. Current capacity of the tailings facility is approximately 7.0 million tonnes, with one minor phase of dam construction remaining. Waste rock is not typically hoisted to surface as it can be used as a source of backfill material for the underground stopes, as needs arise.

   

The Black River-Matheson Township (116,167 ha) has an approximate population of 2,800 residing mainly in the towns of Matheson, Shillington, Holtyre and Ramore. Further to the west are the towns and cities of Porcupine, South Porcupine, Schumacher and Timmins (approximately 45,000 residents). To the north are the towns of Iroquois Falls and Cochrane. To the south is the Town of Kirkland Lake (approximately 10,000 residents).

   

KLG owns an office building in Matheson that is being used as its Regional Exploration Department base. Additionally, SAS acquired two former motels in Matheson that are operated as temporary housing for relocated employees. KLG uses many local residents as support staff and local contractors to maintain the facilities.

   

KLG has recently signed an agreement with First Nations who have treaty and aboriginal rights which they assert within the operations area of the mine.

   

The agreement provides a framework for strengthened collaboration in the development and operations of the mine and outlines tangible benefits for the First Nations, including skills training and employment, opportunities for business development and contracting, and a framework for issues resolution, regulatory permitting and KLG future financial contributions.

Page | 18


Holt-Holloway Property
Updated NI 43-101 Technical report

5.0

HISTORY

   

The following sections are copied (and updated) from the previous technical report (Cater and Salehi, 2015). A summary is presented in the following sub-sections. No material changes occurred since the last technical report was filed in 2015

   

Because of the duality of original ownership of the Holloway and Holt mining operations, the history of each is treated separately in this section.


5.1

Holt Property Prior Ownership

   

In 1922, P.A. McDermott discovered gold in northwestern Holloway Township and, over the next four years, did some trenching and limited drilling on the prospect. McDermott Gold Mines Ltd. was incorporated and eventually ten contiguous claims were patented. A small drilling program was carried out in 1937; however, no further work was done until Sylvanite Gold Mines Ltd. optioned the property in 1948-1950 and drilled 11 holes totalling 925 m along 76 m of strike. In 1950, McDermott Gold Mines Ltd. became McDermott Mines Ltd.

   

In 1981, Camflo Mines Ltd. formally optioned the McDermott claims and staked a large surrounding area. Through 1983, Camflo carried out exploration, drilled 53 holes, and optioned the adjacent Worvest, Lenora, Canamax, and Newmex claims. In 1984, Barrick (then Barrick Resources Corp.) amalgamated with Camflo and, by year end, 120 holes had been drilled. By October 1985, encouragement was sufficient to begin an exploration shaft to an initial depth of 420 m, with development work on two levels. A production decision was made in October 1986, and production at 1,400 tpd began in 1988. In September 2004, the mine was shut down, having produced 1.32 million ounces of gold from 7.5 Mt of ore with a recovered grade of 5.5 g/t. SAS declared commercial production at the Holt mine in 2011.

   

KLG completed the acquisition of SAS in January 2016.

   
5.2

Holloway Property Prior Ownership

   

In 1922, gold was discovered on claims adjacent to the current property. From that time until the late 1930s, Teddy Bear Valley Mines, Ltd. (Teddy Bear) carried out an exploration program that included some underground development. This work did not generate any interest in the property. In the mid-1980s, Teddy Bear renewed exploration drilling on its claims and Noranda Exploration Company, Limited (Noranda) began drilling on adjacent claims. These new programs encountered significant sericite- ankerite alteration and weak gold mineralization at depth.

Page | 19


Holt-Holloway Property
Updated NI 43-101 Technical report

In 1988, drill holes from both properties intersected the upper portion of the deposit, now known as the Lightning Zone, which tops out at approximately 150 m below surface. Noranda then formed a joint venture to earn an interest in the Teddy Bear property. In July 1991, Hemlo Gold Mines Inc. (Hemlo) acquired Noranda’s interest in the Holloway project and surrounding claims. The Holloway Joint Venture was formed in 1992 to fund, develop, and operate the two properties as one mine.

   

The underground validation program in 1992 included a 441 m exploration shaft, 25,600 m of additional diamond drilling, and an 8,500 t bulk sample to study the ore metallurgy. A feasibility study completed in 1994 moved the property ahead into the production- development phase. A total of $55 million was committed to build the surface and underground infrastructure. The mine went into full production on October 1, 1996. That same year, Hemlo Gold Mines Inc. merged with Battle Mountain Gold Company. In January 2001, Newmont merged with Battle Mountain Gold and the Holloway Mine was operated by Newmont Canada Limited. In October of 2004, Newmont acquired the Holt- McDermott Mill and Mine assets from Barrick Gold Corporation (Barrick) and thus controlled 100% of the Holloway-Holt Project assets and land position. To date, the Holloway Mine has produced 0.90 million ounces of gold from 5.1 Mt of ore with a recovered grade of 5.5 g/t gold. In early 2006, Newmont placed the Holloway Mine on care and maintenance. SAS re-opened the Holloway mine in 2009.

   

KLG completed the acquisition of SAS in January 2016.

   
5.3

Historical Mineral Resources and Mineral Reserves

   

In April 2006 Scott Wilson RPA estimated mineral resources (Table 5-1) using polygonal and sectional methods, depending on the diamond drill density.

Page | 20


Holt-Holloway Property
Updated NI 43-101 Technical report

    Tonnes Grade Cont. Gold
    ('000 t) (g/t) ('000 oz)
Holloway Mine Measured 537 6.7 115
  Indicated 500 8.9 144
         
  Measured + Indicated 1,037 7.8 259
         
  Inferred 477 6.3 97
Holt Mine Measured 191 8.1 50
  Indicated 2,794 7.3 655
         
  Measured + Indicated 2,985 7.3 704
         
  Inferred 677 7.9 173
Holloway + Holt Measured 728 7 165
  Indicated 3,294 7.5 799
         
  Measured+Indicated 4,022 7.4 963
         
  Inferred 1,154 7.3 270

 

Notes:

 
  1)

CIM definitions were followed for Mineral Resources.

  2)

Mineral Resources were estimated at a marginal cutoff grade of 3.0 g/t Au and a block cutoff grade of 4.5 g/t Au.

  3)

Mineral Resources were estimated using an average long-term gold price of US$500 per ounce, and a US$/C$ exchange rate of 1.25.

  4)

A minimum mining width of 2.0 to 3.0 metres was used.

  5)

Columns may not add exactly due to rounding.

Table 5-1: Holt-Holloway mineral resources, as of April 30, 2006 (After SWRPA, 2008).

Following the April 2006 mineral resource estimate, SAS has diamond drilled and/or reinterpreted approximately 75% of the mineralized zones on the Holloway-Holt Project. The remaining 25% was not re-assessed and thus the 2006 estimate remained current for that portion.

Mineral resources were updated in June 2008 by SAS staff and endorsed by SWRPA (Table 5-2).

Mineral reserves were updated in June 2008 by SAS staff and endorsed by SWRPA (Table 5-3).

Page | 21


Holt-Holloway Property
Updated NI 43-101 Technical report

    Tonnes Grade  Contained Gold
    (000 t) (g/t Au) (000 oz)
Holloway Mine Measured 850 7.2 196
  Indicated 81 7.0 18
  Meas + Ind 931 7.1 214
  Inferred 447 6.3 91
         
Holt Mine Measured 1,323 6.6 283
  Indicated 1,914 6.8 422
  Meas + Ind 3,237 6.7 705
  Inferred 1,066 7.7 265
         
TOTAL Holloway and Holt Measured 2,173 6.8 479
  Indicated 1,995 6.8 440
  Meas + Ind 4,168 6.8 919
  Inferred 1,513 7.3 356

 

Notes.

 
  1)

CIM definitions were followed for Mineral Resources.

  2)

Mineral Resources were estimated at a marginal cutoff grade of 3.0 g/t Au and a block cutoff of 4.5 g/t Au.

  3)

A minimum mining width of 2.0 m to 3.0 m was used.

  4)

Columns may not add exactly due to rounding.

  5)

Mineral Resources are inclusive of the Mineral Reserves.

Table 5-2: Holt mineral historical resource estimate, as of 2008 (After SWRPA, 2008).

Page | 22


Holt-Holloway Property
Updated NI 43-101 Technical report

      Tonnes  Grade Ounces
      ('000) (g/t) ('000)
           
Holloway Blacktop Footwall Upper Proven 288 6.7 62
  Blacktop Footwall Upper Probable 40 6.7 9
  Blacktop Footwall Lower Probable 170 5.6 31
  Blacktop Lightning Probable 53 5.8 10
  Lightning Zones Probable 181 5.4 31
    Proven 288 6.7 62
    Probable 444 5.6 80
  Subtotals Proven+Probable 732 6.1 142
           
Holt C103 Proven 102 6.3 21
  C103 Probable 19 6 4
  Zone 4 Probable 1,250 5.2 208
  Zone 6 Probable 905 5.7 166
  Tousignant Probable 150 7.9 38
  Zone 1, 5, 8, 8F & Stope 4, 5 Probable 254 6.1 50
    Proven 102 6.3 21
    Probable 2,578 5.6 466
  Subtotals Proven+Probable 2,680 5.6 486
           
  Stockpile Proven 5 3.3 1
           
    Proven 395 6.6 84
    Probable 3,022 5.6 546
Totals   Proven+Probable 3,420 5.7 629

 

Notes:

 
  1)

CIM definitions were followed for Mineral Reserves.

  2)

Mineral Reserves are estimated using an average long-term gold price of US$775 per ounce and an exchange rate of C$1.00 = US$0.87.

  3)

A minimum mining width of two metres was used.

  4)

Rows and columns may not add exactly due to rounding.

  5)

Mineral Reserves are included within the Mineral Resources

Table 5-3: Holt-Holloway historical mineral reserves estimate, as of 2008.

Mineral Resources for the Holt and Holloway Mine Complex were estimated by B. Harwood P. Geo., of KLG (formerly SAS) for the past 3 years (Table 5-4 and Table 5-5).

Page | 23


Holt-Holloway Property
Updated NI 43-101 Technical report

Notes
CIM definitions (2014) were followed in the estimation of Mineral Resource
Mineral Resources are reported Exclusive of Reserves
Mineral Resource estimates were prepared under the supervision of D. Cater, P. Geo.
Mineral Resources were estimated at a block cut-off grade of 2.5 g/t or 2.9 g/t depending on zone
Mineral Resources are estimated using a long term gold price of US$1,200/oz (CDN$1,500/oz) in 2016
A minimum mining width of 3m was applied
A bulk density of 2.84 t/m3 was used
Totals may not add exactly due to rounding

Table 5-4: Holt Mine Mineral Resource Estimate 2014-2016, as of December 31, 2016.

Notes
CIM definitions (2014) were followed in the estimation of Mineral Resource
Mineral Resources are reported Exclusive of Reserves
Mineral Resource estimates were prepared under the supervision of D. Cater, P. Geo.
Mineral Resource estimates were undertaken according to KLG Policy for Mineral Reserve and Resources
Mineral Resources were estimated in 2016 at a block cut-off grade of 3.9 g/t depending on zone
Mineral Resources are estimated using a long term gold price of US$1,200/oz (CDN$1,500/oz) in 2016
A minimum mining width of 3m was applied
A bulk density of 2.84 t/m3 was used
Totals may not add exactly due to rounding

Table 5-5: Holloway Mine Mineral Resource Estimate 2014-2016, as of December 31, 2016

Page | 24


Holt-Holloway Property
Updated NI 43-101 Technical report

5.4

Exploration and Development Work on the Holt-Holloway Property

   

Mineral exploration and development on and around the subject properties began with prospecting around 1918 and have continued to this day through episodes of exploration and occasional production. The initial and very general geological map of the area was produced by the Ontario Bureau of Mines in 1909. This was followed with better detail in the reconnaissance mapping of the Abitibi-Night Hawk gold area in 1918. Prospecting and exploration in the various local townships began in earnest thereafter and continued through the 1940s, with occasional underground programs and minor local production mostly from surface workings. Interest in the area was greatly accelerated in 1944-1945, when it was demonstrated that the Porcupine-Destor Fault (PDF) traversed the area. Significant production has only been in recent times from the Holloway and Holt- McDermott mines.

   

The current land package, more recently known as the Golden Highway property, extends eastwards 40 km along Highway 101 from eastern McCool and Michaud townships, through Garrison, Harker, and Marriott townships to the Quebec border. Apart from the main Holloway and Holt-McDermott properties, the bulk of the remaining holdings derive from claim packages assembled over the years by Noranda Exploration Company, Limited (Noranda), Canamax Resources Inc. (Canamax), and Lightval Mines Limited (Lightval). The Golden Highway – Moneta claim blocks in Garrison, Holloway, and Marriott townships were originally staked by the Noranda associate company, Mining Corporation. In 1945, Moneta Porcupine Gold Mines entered into an agreement with Noranda and subsequently attained a 40% interest in the property. Work completed included prospecting, magnetic surveys, and a total of 13 holes drilled mostly on the Garrison Township claims. In 1980, Noranda completed more work on the Garrison block and drilled one hole to test an electromagnetic (EM) anomaly. Canamax entered into an agreement with Noranda-Moneta in 1983, and between 1984 and 1988 completed extensive geophysics and drilling on the Moneta properties.

   

Much of the Golden Highway property was assembled in the mid-1980s through staking and work options by Rosario Resources, subsequently Canamax. In January 1990, Noranda entered into an option agreement with Canamax covering 411 patented, unpatented, and leased mining claims. In mid-1991, Noranda assigned its rights to earn an interest in the properties and operatorship to Hemlo. In January 1993, Canamax amalgamated with Canada Tungsten Mining Corp. and Minerex Resources Ltd. to form Canada Tungsten Inc. (Canada Tungsten). In late 1996, Canada Tungsten merged with Aur Resources and, at the time, Aur had a 50% interest in the joint venture properties. In January 1996, Hemlo became vested as a 50/50 joint venture partner after having fulfilled all the required work commitments and having made all the necessary option payments. In July 1996, Hemlo merged with Battle Mountain Gold Company and the Golden Highway assets were vested in Battle Mountain Canada Ltd. (BMC). Battle Mountain Gold subsequently merged with Newmont Mining Corporation in January 2001 and the BMC interests were transferred to Newmont.

Page | 25


Holt-Holloway Property
Updated NI 43-101 Technical report

The 60 claim Lightval property was under option to Newmont Mines Limited (Canada) in 1986-1989 and Noranda in 1989-1992, but was ultimately acquired by Newmont through a 1999 option agreement. Newmont acquired the Holt-McDermott Mine and Mill assets from Barrick in October of 2004.

   

Throughout the period described above, a variety of conventional exploration techniques were employed to investigate the gold potential of the various properties. Considerable ground geophysics was done, mostly magnetometer and induced polarization (IP) surveys. Soil and humus sampling for gold was done locally and trenching was attempted in certain areas of shallow overburden. The most useful and definitive exploration procedure was diamond drilling and core assaying. This was the only way that altered, and gold-mineralized zones were located and delineated.

   
5.5

Historical Production from the Property

   

Production records for the Holt-Holloway Property are shown in Table 5-6.

Page | 26


Holt-Holloway Property
Updated NI 43-101 Technical report

      Holt Mine     Holloway Mine  
  Year Tonnes Ounces Recovered    Tonnes Ounces Recovered
    Processed Gold Grade Processed Gold Grade
      Recovered (g/t)   Recovered (g/t)
  1988 219,526 23,993 3.40 - - -
  1989 507,148 63,354 3.89 - - -
  1990 466,708 59,164 3.94 - - -
  1991 594,572 60,727 3.18 - - -
  1992 418,999 47,481 3.52 - - -
  1993 388,116 64,219 5.15 - - -
  1994 367,699 59,872 5.06 8,556 1,844 6.70
  1995 382,470 66,389 5.40 79,701 10,750 4.20
  1996 438,894 117,621 8.34 190,075 37,149 6.08
  1997 418,795 116,368 8.64 381,459 62,793 5.12
  1998 497,122 134,379 8.41 467,134 94,781 6.31
  19 99 501,794 106,701 6.61 487,317 107,780 6.88
  2000 487,127 91,470 5.84 530,865 109,918 6.44
  2001 449,793 83,142 5.75 551,963 105,417 5.94
  2002 471,427 83,947 5.54 552,064 103,633 5.84
  2003 506,905 89,514 5.49 506,633 79,245 4.87
  2004 357,521 55,014 4.79 516,134 79,966 4.82
  2005 - - - 531,012 71,747 4.20
  2006 - - - 136,151 20,748 4.74
  2007 Included in Holloway     153,163 14,471 2.94
  2008 3,485 416 3.71 4,966 592 3.71
  2009 - - - 101,941 18,712 5.71
  2010 23,257 2,022 2.70 340,594 57,459 5.25
  2011 232,330 32,376 4.33 204,258 21,461 3.27
  2012 316,487 50,444 4.96 191,471 21,629 3.51
  2013 369,657 58,898 5.22 177,005 21,330 4.13
  2014 442,108 62,633 4.65 186,238 23,780 4.36
  2015 426,614 63,048 4.85 180,210 28,720 5.45
  2016 416,048 57,086 4.52 203,130 28,135 4.86
               
  Total 9,704,602 1,650,278 5.29 6,682,040 1,122,061 5.22

Table 5-6: Holt-Holloway Property historical production.

Page | 27


Holt-Holloway Property
Updated NI 43-101 Technical report

6.0

GEOLOGICAL SETTINGS AND MINERALIZATION

   
6.1

Regional Geology

   

The Holloway and Holt mines lie within the Southern Abitibi Greenstone Belt (SAGB) of the Superior Province in north-eastern Ontario. The 40 km long, mostly contiguous Holt- Holloway property package is a grouping of strategically located claims straddling the Porcupine-Destor Fault Zone (“PDF”) midway along its 260 km length. The defining structural characteristic of the property package and the most important feature from an economic geology viewpoint is the PDF, around which a multitude of gold showings and prospects are clustered. The Holloway and Holt mines are located opposite each other, approximately one kilometre apart, on the north and south sides of the PDF, respectively (Figure 6-1).

   

In very general terms, the Abitibi Sub-province consists of Late Archaean metavolcanic rocks, related synvolcanic intrusions, and clastic metasedimentary rocks, intruded by Archaean alkaline intrusions and Paleoproterozoic diabase dikes. The traditional Abitibi greenstone belt stratigraphic model envisages lithostratigraphic units deposited in autochthonous successions, with their current complex map pattern distribution developed through the interplay of multiphase folding and faulting.

   

The structural grain is also dominated by east-west trending Archaean deformation zones and folds. The regional deformation zones commonly occur at assemblage boundaries and are spatially closely associated with long linear belts representing the sedimentary assemblages.

   

The southern part of the Abitibi greenstone belt, in the general vicinity of the Holt- Holloway mines, consists of three major volcanic lithotectonic assemblages and two unconformably overlying metasedimentary assemblages.

   

The evolution of the SAGB in the region of the Holloway-Holt Project spans a period of at least 60 Ma from approximately 2,723 Ma to approximately 2,660 Ma and includes volcanism, sedimentation and plutonism. All rocks are at greenschist to upper greenschist grade of metamorphism.

   

After 2,696 Ma, the tectonic regime shifted from volcanic construction to that dominated by deformation, plutonism and erosion accompanied by development of localized basins infilled by sedimentary and volcanic rocks.

Page | 28


Holt-Holloway Property
Updated NI 43-101 Technical report

Figure 6-1: Holt and Holloway mines regional geology.

   
6.2

Local and Property Geology

   
6.2.1

Local Geology

   

The deformation history of the area is defined by five events. The earliest episode of regional D1 deformation (compression and extension) predated the Porcupine angular unconformity at 2,690 Ma. The D2 event (compression and extension) post-dated the Porcupine assemblage and resulted in localized folding and thrusting and early south- side up, dip-slip, ductile deformation on regional deformation zones. Broadly synchronous with the syntectonic opening of the Timiskaming basins in dilatational jogs was D3 folding that resulted in significant left lateral slip movement along the PDF. The

Page | 29


Holt-Holloway Property
Updated NI 43-101 Technical report

D4 folding event created synclines within the Timiskaming assemblage rocks and right-lateral strike-slip displacement along the PDF. The D4-D5 event represents the final stage of transpressional deformation along the PDF. Gold mineralization in the Holt-Holloway area is interpreted to be early D3 in age. Lightning Zone replacement mineralization is cut by an inter-mineral dike with an age of 2672 ± 1.9Ma, which is overprinted by a later auriferous quartz-carbonate veining event. The bulk of the gold in the Timmins area was related to late D3 events.

Gold mineralization at the Holt and Holloway mines comprises replacement carbonate-pyrite-albite-quartz alteration that overprints mafic volcanic rocks in, and adjacent to, D3-D4 high strain zones (Figure 6-2).

Page | 30


Holt-Holloway Property
Updated NI 43-101 Technical report

6.2.2

Holt Property Geology

   

The Holt Mine Complex is situated on the eastern portion of the PDF. Interpretations are made through diamond drilling and underground mapping within the mine complex. As a mafic volcanic deposit, the lithology is mainly Fe-tholeiitic basalts with minor intrusive syenites, which may be up to 2m thick. Syenites cross cut the main mineralized trend potential as conjugate faults. Mineralization is present mainly on the hanging wall side of the Ghostmount Fault. The lower portion of Zone 4 shows a steeper change in dip showing possible rolling of the zone through a fold or offset fault. Additional descriptions about the geology and mineralization for the main zones can be found in Section 7.1.1.

   
6.2.3

Holloway Property Geology

   

The Holloway deposit is hosted by the 30 m to 150 m wide Holloway unit, a south dipping band of Fe-tholeiitic mafic volcanic rocks that is bounded to the south and north by south facing turbiditic sedimentary rocks and komatiitic ultramafic volcanic rocks, respectively. Further geological and mineralization descriptions for the main zones are present in Section 7.1.2.

Page | 31


Holt-Holloway Property
Updated NI 43-101 Technical report

7.0

DEPOSIT TYPE

   

At Holt-Holloway, the deposit is a mafic volcanic hosted where the gold mineralization is quite unlike the classical Superior province auriferous quartz vein systems resulting from deformed, extensional fracture arrays. Rather, it is associated with disseminated sulphides in altered rock, sometimes described as replacement mineralization. Mineralization typically consists of moderately to steeply dipping tabular zones of disseminated pyrite (generally less than 5 per cent per volume) and gold in intensely altered tholeiitic basalt, with variably developed microveinlet stockworks. The ore is gold rich (Au:Ag is greater than 5) and contains concentrations of arsenic. The mineralized zones occur in a variety of geological settings reflecting a variety of controls on the localization of the mineralization: along low-strain lithological contacts (Lightning, Blacktop and Lightning Deep zones at Holloway), along brittle and/or ductile faults (McDermott, Worvest and Mattawasaga zones), and as shallowly dipping discordant zones (Tousignant, South Zone and Zone 4) of which the South Zone (Holt) is spatially coincident with an array of shallowly dipping syenitic dykes.

   

Mineralized zones are coincident with zones of intense albite-ankerite alteration of the host basalt, which, in turn, are partly fringed by sericite alteration haloes at Holloway and fringed by broader zones of calcite alteration. Disseminated specular hematite can be present within or outboard of mineralized zones.

   

Gold mineralization at the Holt and Holloway Mines is associated with replacement carbonate-pyrite-albite-quartz alteration that overprints mafic volcanic rocks in, and adjacent to, D3-D4 high strain zones. The overprinting of multiple mineralization phases in the same area suggests that mineralization was long lived and spanned syn-tectonic deformation during exploitation of the same fluid channel ways.

   
7.1.1

Holt

   

At the Holt Mine, mineralized zones that have been historically mined are hosted by the McDermott shear zone, a 10 m to 50 m wide south-southeast dipping carbonate-sericite- chlorite ± albite altered ductile D3-D4 shear zone, which is hosted by otherwise massive, and generally low strain mafic volcanic rocks. The McDermott shear zone has been traced laterally for approximately 10 km along strike, joining the PDF corridor to the northeast. It has been traced by drilling at least eight kilometres west of the Holt Mine headframe. The shear zone may be localized along an older D2 thrust plane that has structurally emplaced lenses of fine-grained clastic sedimentary units along it. Principal mineralized zones that have been mined to date along the structure include the South, C-104, McDermott, Worvest/Three Star, Mattawasaga, and C-97 zones, which occur over a strike length of three kilometres and have been mined to depths of over one kilometre below surface.

Page | 32


Holt-Holloway Property
Updated NI 43-101 Technical report

More recently, the C-103, Zone 4 and Zone 6 gold mineralization has been identified along these geologic structures and are host to the bulk of the existing gold mineralization. All but the South Zone and Zone 4 occur in steeply south dipping sections of the shear zone. The South Zone and Zone 4 occur where the shear zone rolls to moderate to shallow southerly dips (Rhys, 2005a). Prominent within the Holt Mine geology are two northeast to east-northeast trending brittle faults: the Ghostmount and the McKenna. Although once interpreted as mineralization controlling structures, they offset mineralization and are in fact the youngest structural elements in the region (Rhys, 2005a).

Mineralization frequently occurs within the upper (hanging-wall/south) portions of the McDermott shear zone, often in areas where the structure defined by its carbonate-sericite-quartz altered high strain zone widens from a thickness of generally less than 10 m to locally greater than 50 m wide. The widening may in part be controlled by the interaction of the shear zone with lenses of carbonaceous sedimentary rocks in its footwall. Mineralization occurs in massive to banded quartz-carbonate-pyrite-albite alteration that occurs within the McDermott shear zone and may extend a short distance into adjacent, unfoliated, massive mafic volcanics. Diffuse quartz veinlet networks and matrix are commonly developed, locally imparting breccia textures in sheared rocks. The apparent overprinting of foliation by alteration, and rotation of shear zone fabrics in breccia fragments, collectively suggest that mineralization overprints portions of the McDermott shear zone, and that it formed during or after most shear zone fabric development. An early phase of hematite-bearing carbonate-albite-quartz alteration is often preserved as lenses and domains within and adjacent to the Holt Mine mineralized zones (Rhys, 2005a).

Zones 4, 6 and C-103 at the Holt Mine have a well- established higher grade gold zone (i.e. greater than 3 g/t Au) related to a zone of more intense alteration, including sericite, chlorite, hematite and silicification, and elevated concentrations of sulphides within an overall lower grade envelope. This higher grade zone, typically three to five metres thick, is almost exclusively located along the hanging wall of the deposit, against the Ghostmount fault or any associated fault splay. The zones typically extend over 100 m along strike and 100 m down dip. Figure 7-1 depicts the deposits present on the Holt Mine Complex.

Page | 33


Holt-Holloway Property
Updated NI 43-101 Technical report

South Zone / Zone 4

Zone 4 (the down plunge extension of the South Zone) at the Holt Mine is flatter lying than the other property deposits, which occur on the McKenna and Ghostmount faults, and are typically vertical to sub-vertical. Zone 4 occurs where the shear zones rolls to a moderately shallow southerly dip. This zone is related to a zone of more intense alteration, including sericite, chlorite, hematite and silicification, and elevated concentrations of sulphides within an overall lower grade envelope. This higher grade zone, typically three to 20 m thick, is almost exclusively located along the hanging wall of the deposit, against the hanging wall fault or any associated fault splay. This zone extends over 1,000 m along strike and 400 m down dip. Gold values in Zone 4 die out laterally, over several metres within the envelope of altered rock. There is generally a fairly sharp boundary on the hanging wall side along the hanging wall fault structure, but a more gradational die off of values on the footwall side.

Zone 6

Zone 6 is one of the more recently discovered deposits hosted by the McDermott shear zone. Mineralization occurs in steeply south dipping sections of the shear zone. This higher grade zone, typically three to eight metres thick, is almost exclusively located along the hanging wall of the deposit, against the Ghostmount fault, with less consistent lens of mineralization along the gradational foot wall contact, where the contacts of the mineralization are generally sharp with the surrounding mafic volcanic rocks.

This zone typically extends over a 200 m strike length and 400 m down dip and is open to the east and down dip below the 1075 m level. During 2012 over 21,000 m of diamond drilling was completed above the 775 m level to confirm and expand Zone 6 up dip and to the East.

Page | 34


Holt-Holloway Property
Updated NI 43-101 Technical report

Zone 7 (formerly Ghost Zone)

The Zone 7 mineralization was discovered in 2000 approximately one kilometre east-northeast of the Mattawasaga mineralized zone. The discovery hole, drilled 250 m east of the Holt property boundary, intersected the zone at a vertical depth of 450 m and encountered a broad zone of mineralization returning 3.47 g/t over 32 m and 5.47 g/t over 4 m. Subsequent drilling at approximately 200 m offsets encountered lesser values; however, notable intercepts included 2.64 g/t over 13 m and 2.12 g/t over 14 m, and broad low-grade composites, including 0.68 g/t over 23 m, defined the extremity of the system.

In 2001, Newmont drilled two holes to test the extent of the Zone 7. One hole, approximately 1.7 km to the east, tested 300 m below surface and the second hole, 500 m east of previous drilling, tested to 520 m below surface, in the plunge direction of the zone. Both holes encountered modest alteration with weak gold values but did not particularly define any limits to the Zone 7. In 2005, Newmont drilled five more holes totaling 2,480 m to the west of the zone. Each hole intersected good alteration and modest gold values, such as 3.49 g/t Au over 2.0 m. Similar to the Mattawasaga and Zone 6 deposits, mineralization is hosted by the McDermott shear zone, and occurs in steeply south dipping sections of the shear zone. This higher grade zone, typically three to eight metres thick, is almost exclusively located along the hanging wall of the deposit, against the Ghostmount fault. During 2010 and 2011 SAS drilled 55 holes for over 30 km of drilling. In late 2012, a new mineral resource was calculated.

Tousignant

Gold mineralization is typical Holt mineralization and is very similar to that of Zone 4 and C-103. Gold is associated with disseminated pyrite and intense albite/silica alteration. The zone is characterized by two structural components: a flat south west dipping component in the form of a lens shaped alteration package and a steep south dipping component concordant to a fault belonging to the Ghostmount shear. There is an apparent thickening of the mineralization envelope near to where the two aforementioned structural components intersect.

A 3 g/t Au envelope is completely haloed by a lower grade envelope in the flat zone whilst the vertical zone is typically thinner but, unlike the thicker flat zone, a continuous higher grade envelope cannot be distinguished. The flat zone is typically two to five metres thick whilst the vertical zone is about one to three metres in thickness, thickening slightly towards its upper limits.

Page | 35


Holt-Holloway Property
Updated NI 43-101 Technical report

Although the flat zone was fairly continuous, some lower grade material was included for the purpose of realizing a continuous mineralized zone.

Cascade

Cascade Zone, part of the historic Lenora claim group is located 2km west south west of the Holt shaft (Figure 7-2). Exploration began in 1984 with several diamond drill holes intersecting narrow mineralized lenses along the McKenna Fault. The McKenna Fault is a steeply south dipping late brittle structure part of the McDermott Shear Zone. Mineralized lenses consist of silicified brecciated mafic volcanic rock with hematite and sericite alterations chlorite carbonate stringers and disseminated pyrite. The mineralized zone is found on the hanging wall side of the McKenna Fault, a 2-5cm grey clay gouge. Cascade Zone is also located 400m east of the historic non-compliant resource of Card Lake (Figure 7-2). 2017 drilling aims to expand the zone down its open dip and plunge to the west with hopes to connect Cascade and Card Lake.

Figure 7-2: Cascade Deposit and Card Claims relative to Holt Zone 4 West (plan view).

Page | 36


Holt-Holloway Property
Updated NI 43-101 Technical report

7.1.2

Holloway

   

Mineralization occurs where a 200 m to 300 m wide corridor of east-northeast trending D2-D3 high strain zones obliquely crosses the Holloway unit, resulting in a deflection in its strike to east-northeast trends from east to west-northwest trends that are more typical at the property scale (Rhys, 2005a). Mineralization in the Holloway Mine is present within the Lightning and Lightning Deep, Middle, Blacktop, and Sediment zones. Error! Reference source not found. Figure 7-3 depicts the deposits present at the Holloway Mine.

Lightning Zone

The Lightning Zone is host to by far the largest zone at the Holloway Mine. Mineralized bodies trend east-northeast. It comprises a series of generally interconnected lenses of pyritic replacement carbonate-quartz albite-pyrite zones developed adjacent to and within the high strain zones that overprint earlier formed albite-hematite alteration that preferentially replaces variolitic flow units. Gold most often occurs along the pyrite grain boundaries or, less often, along fractures in pyrite grains. Accessory arsenopyrite, chalcopyrite, sphalerite, and scheelite are very minor constituents overall. Gold grain sizes average 5 µm to 9 µm and visible gold is rare.

Lightning Deep (Formerly Smoke Deep)

The Lightning Deep mineralized zone is hosted within mafic-volcanic rocks that display varying textures and structures. Within the mafic-volcanic lithologies the mineralized area is hosted within an alteration assemblage that has a variable composition. The alteration ranges from strongly silicified, with accessory sericite, albite and hematite to a less silicified, strongly sericitized unit. The majority of mineralization occurs within a dark to light grey silicified host where the gold mineralization is associated with pyrite and occupies a stock work within the host rock. Unlike the Blacktop zone, the alteration zone and associated gold mineralization does not always lie in direct contact with the lower ultramafic suite of rocks; however, in some locations the alteration zone does come in contact with the lithological boundary between the ultramafics and mafic-volcanics and, as a result, so does the mineralized zone. Despite the alteration zone and resulting gold mineralization not consistently being in direct contact with the above mentioned lithological contact the orientation of the mineralized zone closely mimics the orientation of this lithological boundary.

Page | 37


Holt-Holloway Property
Updated NI 43-101 Technical report

Middle Zone

In addition to the quartz vein related mineralization associated with the flat faults, a series of north-trending, moderate to steep east-dipping quartz-tourmaline shear veins occur in the Middle Zone, west of the main Lightning Zone mineralized body. The veins are developed in narrow reverse shear zones and are probably intermediate in age between the Lighting Zone and flat fault related quartz veining episodes. These veins are quartz dominated and contain variable quantities of black tourmaline as ribbons and stylolites. They have auriferous pyritic envelopes and outer sericite-carbonate alteration.

Blacktop Zone

The Blacktop “flat fault” falls within the range of orientation of flat faults in the Holloway Mine, although it has slightly steeper southerly dips than most of these. Mineralization along the flat fault at the Blacktop Zone is predominantly Lightning Zone in style, comprising a tabular zone of grey albite-carbonate-pyrite-quartz mineralization. In general, the gold mineralization and associated alteration and sulphide mineralization at the Blacktop zones has sharp boundaries with the surrounding volcanic rocks with higher grade values (i.e. more than 10 g/t Au) disseminated throughout. As such, the entire mineralized – altered zone was modelled and it is envisioned that the entire mineralized zone from hanging wall to footwall would be mined given that it would be difficult to predict any higher grade trends within this mineralized zone.

Page | 38


Holt-Holloway Property
Updated NI 43-101 Technical report

8.0

EXPLORATION

   

The Holt-Holloway property has a mix of mining and exploration assets. The property package comprising claims, patents, and mining leases covers an area of 115 km2, straddling 40 km of the regionally important PDF. This large and coherent land holding in an old and productive gold belt, with numerous gold deposits and showings focused along the PDF speak to the excellent exploration potential of the area. With four operating mines and a mill in the district provide KLG with a substantial advantage in the belt.

   

The exploration potential on the Holt-Holloway property can be divided into three equally prospective areas:


 

Within the immediate mine areas, typically strike and dip extensions;

     
 

Within and immediately adjacent to the gold mineralization previously discovered, namely at Holloway on the Lightning Deep, Blacktop, Canamax and Seagar Hill property segments and at Holt on the Zone 4 west extension, V-93 (vertical extension) and McKenna zones; and,

     
 

In new areas where conceptual exploration targets have been generated based on both past and recent theories that predict the controls on the location of gold mineralization. Holloway mineralized plunge junction, west of Tousignant, and associated with the Howey-Cochenour trend.


8.1

Mine Area

   

In addition, there remains excellent potential to add to the current mineral resource base immediately adjacent to the Holloway and Holt deposits that can be accessed from the present underground workings. This includes, but is not limited, to the following areas (Figure 8-1 and Figure 8-2):


 

Down plunge extension of Zone 4, V93 and McKenna zones at the Holt Mine;

     
 

Westwards along the hinge line formed by the known deposits within the Holt Mine where additional zones of mineralization may exist;

     
 

Zone 6B: Potential to the east of this zone, beyond current mine workings;

     
 

Zone 1: There is potential to investigate in this zone, 50 m below the 1075 Level;

     
 

Up and down plunge of the Holloway – Lightning and Blacktop zones; and,

Page | 39


Holt-Holloway Property
Updated NI 43-101 Technical report

 

Between the Lightning and Blacktop zones at the Holloway Mine where limited drilling has returned significant gold values from underground drilling.

8.2

Within and Immediately Adjacent to Previously Discovered Areas

   
8.2.1

Lightval

   

In the period 1986-1989, Newmont Mines Limited (Canada) conducted a significant exploration program that included line cutting, geological mapping, lithogeochemical sampling of all rock outcrops, outcrop stripping, channel sampling of stripped areas, ground magnetic surveying, IP and limited HLEM surveying. Diamond drilling of 37 holes totalling 11,316 m was completed. Significant intersections include 2.85 g/t Au. over 9.95 m from hole LV88-8B (green carbonate altered ultramafic) and 1.42 g/t Au. over 14.0 m from hole LV87-2 (altered zone at sediment/porphyry contact). Noranda optioned the ground during 1989-1992 and completed 5.5 line kilometres of IP surveying on five lines on the northern half of the property. Drilling over a three-year period amounted to 30 holes completed for a total of 8,621 m. Significant intersections from this program include 29.85 g/t Au over 1.5 m from hole LV89-51 (sediment/ultramafic contact) and 3.64 g/t Au. over 2.0 m (Lightning Zone style mineralization, mafic/ultramafic contact).

Page | 40


Holt-Holloway Property
Updated NI 43-101 Technical report

During October 2001, Newmont carried out a diamond drilling program comprised of two holes totalling 475 m on the southern portion of the Lightval property. The program was designed to test geological targets with coincident IP chargeability anomalies and, in the case of hole LV01-68, anomalous Au in humus geochemistry. Previous IP surveying (1986) on the Lightval Property, by Newmont Mines Limited (Canada), had outlined a number of untested IP trends in favourable geological settings. No economic gold values were returned from the drilling, although both holes intersected weak to moderately altered zones with low gold values. The highest value obtained was 0.51 g/t Au over 1.0 m from a calcite and hematite altered mafic volcanic from drill hole LV01-69. A moderate to strongly altered section over 13.8 m of silica and lesser albite and ankerite alteration in hole LV01-68, returned only weakly anomalous values of 0.17 g/t Au over 1.0 m. Following this program, two areas of interest were recommended for follow-up, namely the Lightning Zone volcanics package in the northern half of the property and the silica/albite altered interval in LV01-68 in the southern half of the property. The Lightning Zone stratigraphy has not been fully tested at depths below 200 m from surface due to gaps in the potentially more prospective areas of up to 800 m between drill holes. Only one hole tests the 1.8 km long package at a depth of 500 m below surface, which is a favourable zone for flat fault-hosted gold mineralization in the Holloway Mine. The silica/albite altered interval intersected in LV01-68 remains open ended, having possibly been intersected in one historic hole to the west. The zone has been traced for a distance of 300 m in outcrops and pits before disappearing under overburden. More drilling is required here, particularly to investigate the potential of the footwall stratigraphy to the north of the equivalent Lightning volcanic package.

 

 

8.2.2

Harker Newmex / TBone

 

 

This target area is located in Harker Township and is readily accessible from Highway 101 East and Highway 672. KLG conducted diamond drilling at Harker West in 2014 intersecting mineralization associated with the PDF.

 

 

Historically, reconnaissance level drilling in the T-Bone and Newmex areas focused on testing two elevated gold targets one being the McKenna fault and the other the Imperial Fault (antiform hinge). The results outlined an area measuring ~500m in strike length with Au values in the 3-8 g/t Au range over 3-16m widths. The Newmex property was logged in 2015, with KLG prospecting and mapping the property.

Page | 41


Holt-Holloway Property
Updated NI 43-101 Technical report

8.2.3

Deep Thunder / Canamax

 

 

Surface drilling at the Deep Thunder Zone in 2011 was successful in expanding the zone of gold mineralization to the east and has confirmed the presence of higher grade gold structures within a broader zone of alteration. Gold mineralization is concentrated within several sub-parallel zones along steeply dipping structures, from true depths of 620 m to 1,100 m, over a strike length of 350 m.

 

 

In 2014, KLG conducted an infill drilling program consisting of 10 holes / 2,400m. Historical drill core was located and re-analyzed. 2014 re-assay results correlated very well with the historical assays. KLG also re-established survey control on the property. In 2015, additional drilling is planned to test the “gap” (an area of sparse drill coverage) below the Canamax zone which extends down to the Deep Thunder deposit mineral resource.

 

 

8.2.4

Sediment Zone

 

 

Deep surface drilling was initiated in late 2012 to test the down-dip component of the Lightning Deep Zone. During this program, drilling intersected a steeply south dipping, silicified, pyritic zone hosted within the sedimentary unit and KLG has named this new zone the Sediment Zone. The first hole of the program (GH12-001) returned assays grading 5.60 g/t Au. over 8.1 m. Follow-up drilling has continued to intercept the newly discovered zone with recent drilling extending the mineralization over a strike length of 750 m with a 250 m vertical height. The new Sediment Zone is situated approximately 250 m in the hanging wall (south) of Lightning Deep. In 2013 KLG targeted the Sediment zone using existing development from the 550 m drift at the Holloway Mine. The underground drilling concluded that the Sediment Zone dips at 45° south and remains open both to the west and to depth. Drill results returned anomalous gold grades associated with this zone, however the zone appears to be too narrow to warrant additional follow-up.

 

 

8.3

Generative Targets Compilation and Evaluation

 

 

In 2016, KLG employed Geotech to complete an airborne Magnetics/Electromagnetics survey over the Holt-Holloway property (Figure 8-3) as well as several other prospective land claims currently held by KLG. Utilizing this data, the exploration team will generate targets correlating the data with drill holes and other surveys to complete a geological interpretation.

Page | 42


Holt-Holloway Property
Updated NI 43-101 Technical report

KLG geological personnel are actively working up exploration targets on the Holt and Holloway properties and the potential for a repetition of the mineralized zones and the extension of most zones remains open along strike and or at depth. These extensions are regarded as high potential targets by KLG Exploration personnel. In many instances, underground diamond drill platforms are required to facilitate the orderly exploration of these zones where possible. Surface drilling will also be used to support the mine exploration effort where warranted.

8.4

2016-2017 Exploration Programs

   
8.4.1

Holt-Holloway Mines

   

Throughout 2016, exploration in the vicinity of the Holloway-Holt mines continues to be a priority, in order to identify and replenish mineral resources. Recent exploration programs were focused at Holt Deep Zone 4 West Extension, at Lightning Deep, and at Canamax / Deep Thunder.

   

In 2017, exploration programs will search for mineralization further away (over 3 km away) from the Holloway-Holt operations. Approximately 22.2 km of exploration drilling will focus on evaluating the mineralized limits for the West Tousignant/ Harker West and on continuing to evaluate the Howey Cochenour – Coin / Phoenix Fault trend on the Holt property. A regional plan showing the target locations of proposed drill programs is found below Figure 8-4.

Page | 43


Holt-Holloway Property
Updated NI 43-101 Technical report

8.4.2

Tousignant Trend

   

The Tousignant trend (Figure 8-5) is situated approximately 3 km west of the Holt headframe and contains a wide variety of potentially mineralized targets which warrant drill follow-up in 2017. KLG expects to follow-up on 2015 drill program results where near-surface mineralization was intersected in Holes TZ15-004 and 005 which returned assays of 3.10 g/t Au over 6.1m and 8.50 g/t Au over 4.8m, respectively. This mineralization remains open to the west and is considered to be winter work given the low ground in the area. Follow-up drilling in 2017 will test both the strike potential along the Ghostmount Fault and the potential for repetitive flat lying mineralized extensions as found associated with Zone 4 and Tousignant.

Page | 44


Holt-Holloway Property
Updated NI 43-101 Technical report

8.4.3

Howey Cochenour / Coin Trend

   

The Howey Cochenour / Coin Trend is situated 3 km south of the Holt headframe in the vicinity of the polishing pond. This is a shear hosted zone, which is associated with the rhyolite / mafic volcanic contact seen in test pits, trenches and scout level drilling conducted by KLG. The mineralized zone has been effectively traced over a 400m strike length and remains open along strike in both directions and could possibly be associated with the Golden Harker property situated 3 km to the west of the present drilling coverage. A small trenching and sampling program and a 7-hole drill program was conducted in 2014, all of which returned anomalous gold values in every hole. The 2017 exploration objective for this zone is to actively explore along strike for mineralization associated with this trend.

   
8.4.4

Harker Newmex / TBone

   

Drilling was proposed on these targets (as indicated by the yellow stars in Figure 8-6) in 2016. Additional drilling is planned for 2017.

Page | 45


Holt-Holloway Property
Updated NI 43-101 Technical report

Page | 46


Holt-Holloway Property
Updated NI 43-101 Technical report

9.0

DRILLING

   

KLG contracts out all of the diamond drilling on surface and underground. The diamond drilling provides whole core recovery in mainly NQ diameter for the geologist to log and model. The core is boxed by the contractor at the drill site and transported to the core shack on the mine property.

   

From underground, exploration and definition drill core is recovered in BQ size. The core is also boxed by the contractor underground and then hoisted up to surface through the shaft in a bin or pallet, which is placed in front of the core shack.

   

For 2017, KLG plans to utilize 3 surface drills to explore targets in the Holt-Holloway trends.

   

Presently, all diamond drill holes are in Holt or Holloway Mine grid for underground and UTM NAD 83 Zone 17 for surface. Drilling from surface is collared using a handheld GPS. KLG has a conversion formula for both mine grids to UTM and vice versa as calculated through control points by Talbot Surveys. Recent collar data for surface holes may also have the respective mine grid associated with the UTM grid.

   

The strike of the mineralized zones in the region are east-west with a steep moderate dip to the south. Drilling to intersect zones are best completed when drilling from the south to the north from surface. There are instances where cross cutting veins and mineralized zones may be present perpendicular to the mineralized trend.

Page | 47


Holt-Holloway Property
Updated NI 43-101 Technical report

10.0

SAMPLE PREPARATION, ANALYSES AND SECURITY

   
10.1

Sampling Methods

   

Diamond drill core samples, chip samples and muck samples are all used at Holt Mine for grade control. Only the core samples and the chip samples are used for reserve and resource determination.

   

The treatment of diamond drill core depending on location and purpose can vary in the sampling method. The main methods are surface exploration, underground exploration and underground definition. A standardized protocol for sampling of surface exploration diamond drill core, as well as for underground sampling of chip and muck samples, for gold analyses, is employed by KLG. From the 2010 drill campaign ongoing, this protocol was documented , , and geologists and technicians were trained on using the protocol. Revisions were made to the technical procedure over time, but the practices remained the same.

   

With all drill core, intervals of interest are sampled at a maximum interval of 1.5 m is sampled unless variation in mineralization, lithology or alteration dictates that a smaller interval should be used. A minimum sample interval of 0.3 m is also applied to sampling procedures. If a gap of 7.0m or less is between sampled intervals of interest, the sampling continues through that gap for continuous results. Visual recognition of variation of auriferous (sulphide) mineralization concentration, strength of alteration mineralization and lithological host are keys used by the geology personnel in determination of an appropriate sample length to be employed. More specifically, samples are begun or ended at the interface of different lithology, alteration assemblages, or concentrations in auriferous mineralization. Sampling extends into barren rock at a minimum of one sample at the beginning and end of any sampled interval. Each sample is assigned a unique sample number, preferable six digits long, as recorded on pre-printed sample tag books. Sample data are entered in the DHLogger program as the samples are being laid out and this information is confirmed by the logging geologist prior to placing the core in the queue for cutting. During sampling, one portion of each tag is placed in each numbered sample bag, while another portion remains in the core box at the end of each sample, and another portion remains in the tag book which contains all records for that sample. QCs in the form of barren samples and standards are inserted into the sample sequence at an industry accepted frequency of 1 barren sample and 1 standard in every group of 20 samples.

   

The surface exploration drill core samples are tagged by the geologist and transported to the cutting room on site. A technician employed by KLG then cuts the core using a diamond saw blade. The weight of the sample varies from two to ten kg depending of the length of the core sample, its nature (massive sulphides, chloritic waste rocks).

Page | 48


Holt-Holloway Property
Updated NI 43-101 Technical report

All drill core sampled from underground definition drilling that falls within stated reserves shapes is bagged whole and typically assayed at KLG’s Holt assay lab or sent out to a third party lab (Swastika). Remaining core outside the sample interval is kept in storage racks at Holloway Mine pending review of final gold analyses of sampled material. Once values are received and reviewed by a geologist and no further sampling of an individual drill hole has been determined to be necessary, the remaining drill core is discarded.

For all drill core sampled for definition drilling that falls outside current reserves shapes, the same protocols are applied with the exception that some core is split using a hydraulic splitter, with one half forming the sample and the other half remaining in the core box. This remaining core is stored in racks at the Holloway Mine site, where sample tags remain in the boxes at the appropriate intervals for future review. Determination of what material should be split and stored is performed by a geologist (e.g. the project, senior or chief geologist) in charge of overseeing the drilling program. All drill core obtained from underground exploration drilling is sampled under the same protocol, with the exception that all samples and core are split and stored permanently as described above.

Chip sampling of development faces underground also abide by the above described protocol in that sample lengths can range from a minimum of 0.3 m to a maximum of 1.5 m and are delineated by lithological and alteration assemblage, as well as by concentration of auriferous minerals. Chip sample orientations are chosen so that an optimal cross-section of observed material on the face is represented, when logistically possible. Once gold values for obtained samples are received, they are incorporated into drawings and may be used as additional data for evaluations of grade control shapes compiled to maximize gold recovery. Chip samples are analyzed at the Holt Mine assay lab and have a typical turnaround time of 3 days.

After a round is blasted underground and also long hole stopes where access to personnel is restricted for safety, the mining or mucking crew will obtain muck samples from the freshly blasted round. KLG practices dictates that 1 random grab sample from the muck be taken for every 20 tonnes of muck. These samples serve to gauge the mill feed and to confirm the chip sample results. Muck sampling of all the workings, development and stopes is now carried out for mining control and reconciliation purposes.

These samples are tagged and placed in appropriately marked sample bags and then hoisted to surface to be tested at the Holt Assay Laboratory. At the lab, they are reduced in size by riffling before being treated by the standard assay procedures.

Page | 49


Holt-Holloway Property
Updated NI 43-101 Technical report

10.2

QC/QA Comparative Assay Laboratory Program.

   

KLG engages in industry standard practices to re-test mineralized rejects at a second commercial lab for a check on the quality of the primary assay results. Approximately 5% of the mineralized exploration samples that go directly to a commercial lab are sent to another commercial lab for verification. As a standard procedure, all exploration samples that assay above 1.0 g/t Au are subjected to multiple re-assaying as a check on the particular intersection.

   

The program to send the samples out for check analysis is under the direction of H. Miree, P.Geo. of KLG for underground drill core and T. Gallo of KLG for surface drill core.

   

A lab comparison check was completed on the samples from the 2016 drilling. Both the rejects (Figure 10-1) and pulps (Figure 10-2) were re-tested at Bureau Veritas with the results summarized below.

   

Overall, 175 samples were re-tested with 122 samples being rejects and 53 samples being pulps. The majority of the data showed comparable results with a slight positive bias towards results from the original Lab Expert results. These discrepancies could be due to variability in the labs or the inherent variability in the gold sampling.

Page | 50


Holt-Holloway Property
Updated NI 43-101 Technical report

Page | 51


Holt-Holloway Property
Updated NI 43-101 Technical report

10.3

QC/QA Holt Assay Lab

   

The Holt Assay Laboratory follows industry standard protocols for sample preparation and assaying. The lab inserts QC/QA standard samples, barren samples and a duplicate with each batch to test that proper procedure is being followed for quality control.

   
10.4

Assay Laboratory Site Audits

   

Analytical labs used by the Exploration group are routinely inspected and a more detailed lab audit was conducted by Analytical Solutions Ltd in March 2017. Recommendations from the audit concluded that the Holt Laboratory has tight turnaround time requirements. Based on the available quality control data, the laboratory team produces good quality gold fire assays suitable for most mine applications. The gold is generally described as very fine grained and is associated predominantly with pyrite so that pulps are relatively homogeneous and assays are repeatable.

   

The mine laboratory receives mostly muck and “stope” samples (some of which are chip samples). These sample types are biased and representative samples are difficult to achieve. Although the data are useful for long-term reconciliation and ore-waste discrimination, high precision assaying will not make the results more reliable. As a result most mine laboratories, including Holt, focus on providing reasonably accurate results and focus on meeting 8 hour turnaround times.

Page | 52


Holt-Holloway Property
Updated NI 43-101 Technical report

In contrast, whole core is assayed for underground drill holes and additional quality control is in place. A reference material is included in each fire assay batch and pulps are submitted for check assays. In addition, geologists submitted reference materials with core in 2016.

Page | 53


Holt-Holloway Property
Updated NI 43-101 Technical report

11.0

DATA VERIFICATION

   

Historical and more recent drill records have been compiled in a digital database for the project and verified to the maximum extent possible. Diamond drill logs are available in hard copy for historical data. Photos of the drill core are taken in the event that core is not available to be viewed.

   

In 2015, KLG employed a database manager to verify and compare historical data from hard copies to its digital compilations. Work is ongoing for historical data in the Holt/Holloway database with no major concerns or changes to report at this point.

   

In the QP’s opinion, the data collected and available are adequate for the purposes used in this technical report.

Page | 54


Holt-Holloway Property
Updated NI 43-101 Technical report

12.0

MINERAL PROCESSING AND METALLURGICAL TESTING

 

 

The following sections are copied (and updated) from the previous technical report (Cater and Salehi, 2015). A summary is presented in the following sub-sections. No material changes occurred since the last technical report was filed in 2015.

 

 

12.1

Metallurgical Testing

 

 

In 2014, a series of 30 kg bulk samples were collected from representative core samples for both the Ghost and Tousignant Zones for use in grinding test studies. SGS Mineral Services was requested to perform metallurgical testing to evaluate St. Andrew Goldfields Ltd.’s Tousignant Lens and Zone 7 ore body samples. From the assaying protocol applied, it was determined that the gold head grades were 3.60 g/t Au for Zone 7 sample GS 11-002, 3.83 g/t Au for Tousignant Lens sample 1 and 5.74 g/t Au for Tousignant Lens sample 2. The samples contained between 1.16% to 1.66% sulphide sulphur and 7.04% to 12.4% carbonate.

 

 

The Bond ball mill grindability tests performed were categorized as hard to very hard with Bond ball mill work indices (BWI) ranging from 19.0 kWh/t to 22.7 kWh/t.

 

 

For the CIL tests performed on the Zone 7 samples, gold extractions ranged from an average of 87% for samples GZ11-002 and GZ12-014 to 90% for sample GZ12-017B. The final residue gold grades ranged from an average of 0.41 g/t Au for sample GZ12- 017B to 0.48 g/t Au and 0.49 g/t Au for samples GZ11-002 and GZ12-014, respectively. For the CIL tests performed on the Tousignant Lens samples, gold extractions ranged from an average of 93% for sample Tousignant Lens 1 to an average of 94% for sample Tousignant Lens2. The final residue gold grades ranged from an average of 0.32 g/t Au for sample Tousignant Lens 2 to an average of 0.39 g/t Au for sample Tousignant Lens 1. These samples were shipped to SGS Mineral Services Lakefield, where the metallurgical test work was completed.

 

 

At Canamax, recent infill drill program core was collected and used to conduct bottle roll test work on representative mineralization from the project site. The four bottle roll tests indicated that recovery rates range from 93.8 to 95.4% can be expected on a 6.85 g/t Au grade material.

 

 

A summary of test work completed on ore from the various zones is presented in Table 12-1 and summary recent bottle roll test results for Canamax is presented in Table 12-2.

Page | 55


Holt-Holloway Property
Updated NI 43-101 Technical report

Test Zone 5 Zone 6 Zone 8  Blacktop Lightning Blacktop Footwall Holloway stock pile ore
Standard leach tests at different grinds (48 hours) 3 tests 3 tests 3 tests 5 tests    
Carbon in leach test (different carbon concentrations)       3 tests 3 tests  
Flotation and leach of flotation tail       1 test 1 test  
Ball mill work index       1 test   1 test
Preg-robbing test       1 test 1 test  
Diagnostic test       1 test    
ICP analysis 1 1 1 1 1  
Whole rock assay       1    
Carbon analysis       1 1  

Table 12-1: Recent metallurgical test work on Holloway ore.

Table 12-2: Metallurgical standard leach test results.

Leach test recoveries varied between 86% and 95% depending on the zone. Blacktop, Lightning and Footwall samples had the lowest recoveries. Results indicated that the Blacktop Footwall ore, which contains preg-robbing graphite, should be treated by a CIL process to attain higher recovery. This is the process used at the Holt Mill. Recent Canamax bottle roll tests returned recovery rates ranging from 93.8% to 95.4% .

Page | 56


Holt-Holloway Property
Updated NI 43-101 Technical report

Gold in the tails of the Blacktop and Lightning mineralized material is thought to be associated exclusively with sulphides. Finer grinding offers limited recovery increases. Mineralogical studies may help to understand the gold occurrence in these samples. Process alternatives to offset this problem seem limited as oxidation processes are not considered to provide an economic alternative, taking into account the limited gold recovery increase and the proportion of tonnage involved.

   

All leaching tests were based on 48-hour residence time. At the planned production rate of 1,500 tpd, the residence time in the pre-aeration and leach circuit would be 48 hours. A kinetic leaching test, by type of ore, versus a residence time relationship should be considered as a method to determine if recoveries could be improved.

   

The results obtained are based on lab scale tests on small samples from a limited quantity of mineralized material.

   
12.2

Mineral Processing

   

There has been production from the Holt and Holloway mines which provides records of metallurgical performance (Table 5-6). The ores from the two mines were blended and processed with other ore in the past.

   
12.2.1

Holloway Mine Ore

   

Process plant statistics from 2009 to 2012 are presented in Table 12-3. Metallurgical recoveries varied from 86.9% in 2009 to 90.2% in 2012.


    2009 2010 2011 2012 Total
Tonnes milled (t) 101,941 340,594 204,258 191,471 838,264
Grade (g/t) 6.57 6.04 3.84 3.90 5.08
Contained ounces ozs 21,529 66,122 25,199 23,990 136,840
Recovery rate % 86.9% 86.9% 85.2% 90.2% 87.2%
Recovered ounces ozs 18,712 57,459 21,461 21,629 119,262

Table 12-3: Mineral processing statistics for the Holloway ore (since 2009).

   
12.2.2

Holt Mine Ore

   

Process plant statistics since re-starting the operation in 2010 are presented in Table 12-4. Metallurgical recoveries varied from 92.5% in 2010 to 94.4% in 2016.

Page | 57


Holt-Holloway Property
Updated NI 43-101 Technical report

    2009 2010 2011 2012 Total
Tonnes milled (t) 0 23,257 232,330 316,487 572,074
Grade (g/t) 0 2.92 4.63 5.25 4.91
Contained ounces ozs 0 2,185 34,611 53,444 90,241
Recovery rate % 0%  92.5%    93.5%    94.4% 94.0%
Recovered ounces ozs 0 2,022 32,376 50,444 84,842

Table 12-4: Mineral processing statistics for the Holt ore (since 2010).

Page | 58


Holt-Holloway Property
Updated NI 43-101 Technical report

13.0

MINERAL RESOURCE ESTIMATES

   

The Mineral Resources effective as of December 31, 2016 are summarized in Table 13-1.

Notes
CIM definitions (2014) were followed in the estimation of Mineral Resource
Mineral Resources are reported Exclusive of Mineral Reserves
Mineral Resource estimates were prepared under the supervision of D. Cater, P. Geo.
Mineral Resources were estimated at a block cut-off grade of 2.9 g/t for Holt and 3.9 g/t for Holloway
Mineral Resources are estimated using a gold price of US$1,200/oz (CDN$1,500/oz)
A minimum mining width of 3m was applied
A bulk density of 2.84 t/m3 was used
Totals may not add exactly due to rounding

Table 13-1: Mineral Resources for the Holt and Holloway properties (as of Dec 31, 2016).

   
13.1

Database

   

The current drillhole database for the Holt and Holloway mines consists of 15,611 drill holes from surface and underground. The majority of underground drilling was done with BQ diameter core, the surface drilling was a mix of BQ and NQ diameter. The drill hole database used for all resource estimates updated by the current report was complete as of December 31, 2016. The database used in the mineral resource estimates consisted only of diamond drill hole data; no underground chip samples were used.

   

The Holt and Holloway mines have a history of production and good reconciliation between the mill and block model grades. This indicates that the majority of the drillhole database is reliable and can be used with confidence. Spot checks were conducted on the original assays against the Datamine drill hole database for 20 holes, randomly selected from 2011-2012 drilling.

   

Three surface diamond drillholes were removed from the database because the locations of the collars or the downhole deviation are known to be incorrect. The holes removed from the database were: F-02-3w, W-02-2 and W-97-1.

Page | 59


Holt-Holloway Property
Updated NI 43-101 Technical report

13.2

Geological Interpretation and 3D Solid Modelling

   

Geologic interpretation and 3D modelling was completed by the Senior Geologists for the respective mines. The main criteria for inclusion within a mineralized zone were: lithology, alteration, major structures and gold grade. The cut-off grade used for 3D modelling was 1.0 g/t, with exceptions allowed to follow alteration, lithology or structural contacts. All 3D modelling of low grade mineralized envelopes was done using the Datamine Studio3 software. The shapes were verified by the Chief Mine Geologist and by the Resource Geologist.

   

3D models of underground lateral development and stoping were verified and imported into Datamine from AutoCAD by the Mine Engineering Department personnel.

   
13.3

Density Data

   

The density used for mineral resource estimation is 2.84 t/m3, which essentially corresponds to historical density determinations at both the Holloway and Holt deposits. These density determinations seem appropriate for a sulphide replacement style of deposit within a sequence of mafic volcanic – ultramafic rocks. No correlation exists between gold grade and density and, therefore, a bulk density by rock type was considered appropriate for this deposit.

   

During the SAS drilling campaign between 2006 and 2008, in excess of 1,030 samples from the mineralized zones were sent to Laboratoire Expert for specific gravity determination (i.e. sample dried and weighed (D) and then immersed in water and weighed (W), SG=D/(D-W)). The average density determination by the lab was 2.81 t/m3, a difference of approximately 1% compared with historical results. The recent work is not considered sufficient to modify the density estimate for the current resource estimation.

   
13.4

Assay Composites

   

Samples used in the resource calculation process at the Holt and Holloway mines consisted of drill core samples only. Chip samples were not used in the grade estimation procedure. Typical underground drill core is BQ (37 mm) in size.

   

Samples were taken at the discretion of the geologist. They were identified with a sample number, securely sealed and transported to the assay lab located at the Holt mine site. Core samples from the surface drill program were typically NQ caliber (48mm) in size, were sawed in half and shipped to Lab Expert for gold analysis, located in Rouyn- Noranda, (QC).

Page | 60


Holt-Holloway Property
Updated NI 43-101 Technical report

Quality control (QC) samples consisting of both certified reference standards and blanks were inserted into the sample stream for exploration samples only. The labs also use internal calibration standards to act as a QC check; these were considered sufficient QC for definition drilling.

   

Assay results were returned to the geologist by the lab in excel format and the results were uploaded into the drillhole / mine sample database.

   

Composite lengths for drillhole data were determined on a zone by zone basis by creating histograms of sample length through each mineralized zone. In most cases, the sample lengths were clustered around 1.0 m, with a maximum sample length of 1.5 m (consistent with KG Standard Operating Procedure for core sampling). Samples were composited to 1.5 m in all cases. Orphan samples (residual composites at the edge of the zone) were distributed evenly with the other composites of each drillhole, maintaining a composite length as close to 1.5 m as possible. This method prevents any data from being discarded at the margins of the mineralized envelope.

   

No correlation between density and grade has been identified, so only sample length was used to weight the grades during compositing. Missing or unsampled areas were assumed to have trace gold grade and were assigned a grade of 0.0025 g/t Au.

   
13.5

Assay Statistics

   

Statistical analysis was conducted on the assay populations of each zone, or grouped zones, where possible. Histograms and probability plots of gold grade were created (Figure 13-1 and Figure 13-2). Gold grade capping of 25 g/t has been used in historical estimates for the Holt and Holloway mines and has been shown to reconcile well on a stope-by-stope basis. Probability plots indicate that 25 g/t is a suitable capping value based upon inflection points in the sample population in the area of the 95th to 99th percentile; it has been used in the majority of the grade estimates in this report. The zone V-93 was not capped as there were no anomalously high grade samples and a relatively small dataset. The Tousignant Zone was capped at 20 g/t, but there were no anomalously high gold grades and capping probably wasn’t necessary. Capping was applied prior to compositing. The number of samples capped was less than 1% for each zone, with the exception of C-104, where two lenses were between 1% and 2%. Resource estimates were insensitive to capping values, due to the low numbers of capped samples and the absence of anomalously high gold grades. The difference in total tonnes and grade for Zone 4 “upper” (inclusive of reserves), with capping of 25g/t and un-capped is shown in Table 13-2: it demonstrates that the effect of high grade gold assay capping on the mineral resource estimation process at the Holt and Holloway mines is minimal. This is attributed to the fact that most assay results for the zones were less than 25 g/t Au and from the lack of high grade “nugget” outliers. Gold grade distribution behaves quite well.

Page | 61


Holt-Holloway Property
Updated NI 43-101 Technical report

Page | 62


Holt-Holloway Property
Updated NI 43-101 Technical report

Cut-off (g/t) Capped at 25 g/t   Uncapped  
  Tonnes Grade (g/t)  Ounces Tonnes Grade (g/t) Ounces
2.50 3,971,868 4.54  580,467 3,978,956 4.67 597,896

Table 13-2: Capped and uncapped models for Zone 4 “upper” and “east”.

   
13.6

Semi-Variograms

   

Semi-variograms were created for each zone or grouped zone using capped composite values (Figure 13-3 and Figure 13-4). Model semi-variogram parameters (nugget and sill variance, range and orientation) are summarized for each zone in Table 13-3. Anisotropic semi-variograms were created for the majority of zones. Where reliable anisotropic semi-variogram directions could not be determined, omni-directional semi- variograms were created to determine effective ranges for grade interpolation. Omni- directional semi-variograms were also used as a guideline for effective distances to categorize mineral resources as measured, indicated or inferred. In some cases the “vertical” axis of the anisotropic semi-variogram could not be modelled accurately, likely due to irregular orientations of underground drilling (e.g. Holt “Vertical Zones”, which include: Zone 4 “lower”, C-95, C-97 and C-99). In those cases the model semi-variogram vertical component was estimated as a reasonable best-fit.

Page | 63


Holt-Holloway Property
Updated NI 43-101 Technical report

Page | 64


Holt-Holloway Property
Updated NI 43-101 Technical report

Zone Sill Variance or Nugget Structure(s) Spatial Range & Anisotropy   Rotation  
  (Log Variance) Variance   Variance Angles (dip Dir'n / Dip)   Angles  
          Axis 1 Axis 2 Axis 3 Z Y X
Lower Middle Zone 6.563 1.883 Exponential 3.505 6 6 6 Omnidirectional    
      Exponential 1.175 76 76 76      
Upper Middle Zone 8.723 2.407 Spherical 2.804 10 10 10 Omnidirectional    
      Spherical 3.512 38 38 38      
Zone 4 upper and Zone 4 East 9.954 2.986     4.89/-24.5 275.67/1.71 9.42/65.43      
      Exponential 4.977 7 10 3 185.67 -1.71 204.51
      Exponential 1.991 17 31 6      
Zone 4 lower, C-95, C-97, C-99 3.059 0.314     153.26/58.53 260/10 355.73/29.5      
      Spherical 2 22 31 8 170 -10 60
      Exponential 0.745 37 31 8      
C-104 Lens 4 10.453 4.454     180/60 90/0 0/30      
      Spherical 4.3 11 12 7 0 0 120
      Spherical 1.699 11 22 7      
Smoke Zone 3.389 0.8 Spherical 2.214 12 12 12 Omnidirectional    
      Exponential 0.375 84 84 84      
Ghost Zone Lens 1 6.446 1.457 Spherical 0.084 7 7 7 Omnidirectional    
      Exponential 4.905 7 7 7      
Tousignant Lens 1 15.575 4.641 Spherical 5.654 6 6 6 Omnidirectional    
      Spherical 5.28 35 35 35      
Tousignant Lens 2 1.529 0.49 Exponential 1.039 20 20 20 Omnidirectional    

Table 13-3: Semi-variogram model parameters.

Page | 65


Holt-Holloway Property
Updated NI 43-101 Technical report

13.7

Block Model

   

Three-dimensional block models were calculated using Datamine software for each zone to interpolate gold grade between drillholes. The block models were created by filling the mineralization envelopes for each zone with cells of a predefined size; the cells were oriented to follow the strike and dip of the zone. Cell size, orientation and number of sub-cells for each modelled zone are displayed in Table 13-4.

   

For all zones the block size was chosen to correspond to approximately ¼ of the average drillhole spacing, with the exception of the Tousignant and Middle zones. For Tousignant, a number of spatial irregularities were observed with larger block sizes, so a smaller size was used. It is recommended that some definition drilling be completed there, to minimize the adverse effects of using a small block size with relatively wide drill spacing (approximately 25 m by 25 m), such as over-smoothing of data, particularly at the limits of the search ellipsoid radius from a composite. The Middle Zone lenses were irregularly shaped and a smaller block size allowed the cells to fit better within the mineralized lenses.


Property Zone Block Size (m) Block Rotation (o ) Subcells
    X Y Z Z Y X X Y Z
Holt Zone 4, Zone 4 East, C-95, C-97, C-99 3.0 3.0 3.0 -12.9 19.3 -22.5 6 6 6
  C-104 3.0 3.0 3.0 -2.0 0.0 22.0 6 6 6
  V-93 4.0 4.0 3.0 -8.5 0.0 18.0 8 8 6
  Tousignant Zone, Lens 1 1.0 1.0 0.5 103.4 -14.9 -6.2 2 2 2
  Tousignant Zone, Lens 2 1.0 1.0 0.5 -2.0 13.0 -14.0 2 2 2
  Tousignant Zone, Vertical Lens 1.0 0.5 1.0 -14.5 3.2 20.3 2 2 2
                     
Holloway Smoke Zone (Main upper, Main lower, Main east, East) 3.0 3.0 3.0 14.0 0.0 0.0 6 6 6
  LMZ, Lens 1 1.0 1.0 0.5 -15.0 -24.0 37.0 2 2 2
  LMZ, Lens 2 1.0 1.0 0.5 19.0 -20.0 33.0 2 2 2
  LMZ, Lens 3 1.0 0.5 1.0 -0.6 0.0 19.3 2 2 2
  LMZ, Lens 4 1.0 0.5 1.0 -8.0 -6.0 40.0 2 2 2
  LMZ, Lenses 5-1 & 5-2 1.0 1.0 1.0 -0.6 0.0 19.3 2 2 2
  LMZ, Lens 6 1.0 1.0 1.0 -0.6 0.0 19.3 2 2 2
  LMZ, Lens 7 1.0 1.0 0.5 -8.0 -6.0 40.0 2 2 2
  LMZ, Lens 8 1.0 0.5 1.0 4.0 0.0 28.0 2 2 2
  UMZ, Lens 1 1.0 1.0 1.0 6.0 -45.0 32.0 2 2 2
  UMZ, Lens 2 1.0 1.0 1.0 - - - 2 2 2
  UMZ, Lens 3 1.0 1.0 1.0 10.0 34.0 -8.0 2 2 2
  UMZ, Lens 4 1.0 1.0 1.0 5.0 30.0 11.0 4 4 4
  KZ, Lenses 1 & 2 1.0 1.0 1.0 5.0 30.0 11.0 4 4 4
  Ghost Zone, Lens 1 8.0 2.0 8.0 -13.0 0.0 19.0 4 4 4

Table 13-4: Block model set-up parameters.

Page | 66


Holt-Holloway Property
Updated NI 43-101 Technical report

13.8

Grade Interpolation

   

Gold grades were interpolated into the block model using ordinary kriging (OK) whenever reliable anisotropic semi-variogram models could be fit to the data. For folded or irregularly shaped zones, or where the sample dataset lacked sufficient data, inverse distance squared (ID2) was used. The parameters used in the grade estimation calculation are displayed in Table 13-5.

   

To facilitate the resource estimation process, a number of zones with similar orientations were grouped together for geostatistical analysis and block modeling. Zone 4 (Holt Mine) was grouped with Zone 4 East, which is an extension of the zone to the east. Zone 4 itself was split into two domains with different orientations:


 

Zone 4 “upper” lies on a moderately dipping cross fault; this domain was grouped with Zone 4 East.

     
 

Zone 4 “lower” is sub-vertical and follows the Ghostmount fault. Zone 4 “lower” was grouped with C-95, C-97 and C-99 for modelling, as they are adjacent zones following the same structure.

The Lightning Deep Zone (Holloway Mine) consists of 4 lenses along a sub-vertical structure. These lenses were also grouped and modelled together.

The search ellipsoid orientations were determined by the orientations of the anisotropic semi-variograms for each zone. In the majority of cases, where no reliable anisotropic semi-variogram was found, the search ellipsoid was visually oriented parallel to the strike and dip of the zone. In some cases (e.g. Lightning Deep Zone), the zone was folded. In those cases the search ellipsoid orientation was dynamic, following the orientation of the wireframe. The dynamic orientation was defined by digitizing two sets of strings on closely spaced sections that followed the strike and the dip of the mineralized lens. The Studio3 software uses these strings to create a “net” of points, each with dip and dip direction attributes. During grade estimation, the closest points are used to define the orientation of the search ellipsoid.

For most of the zones modelled, three estimation passes were completed for each cell estimated. The first pass was more restrictive, designed to populate only cells where there was a high confidence in the grade estimate. This pass was designed to populate the measured or indicated categories, depending on the zone being modelled. At least two drillholes were required to populate the first search volume. Smoothing was minimized close to sampled locations (drillhole intersections) by reducing the maximum number of composites that were considered for each estimated cell. The second pass was less restrictive but cells were also populated by at least two drillholes. This pass increased the smoothing of the model by allowing a larger number of composites to be considered in the grade estimation. When used, the third pass was designed to interpolate grades for outlying areas of the mineralization envelope, and typically only required one drillhole to populate cells with grades. Cells populated by the third search volume were restricted to the inferred category.

Page | 67


Holt-Holloway Property
Updated NI 43-101 Technical report

Zones with a high drillhole density used composites from at least two octants of the search ellipsoid to populate cells for all estimation passes. This method helps reduce the effects of oversampling in certain directions, particularly for zones where ID2 was used.

Table 13-5: Parameters for grade interpolation for all zones.

   
13.9

Model Checks

   

A number of checks were performed to verify that each model was producing a reliable estimate. Visual inspection of each block model in cross-section and in 3D helped to ensure that block model grades agreed with composite grades, and that the continuity of the model was consistent with the drill hole data. Visual inspection also verified that the parameters used in the model were reasonable, such as search ellipsoid orientation and constraining parameters.

   

For the larger zones (e.g. Zone 4) a number of additional checks were performed. The drill hole data was de-clustered to remove the effects of preferential sampling in high- grade areas and the mean grade of the model was compared to the mean grade from the drill holes. Agreement was good in all cases. Q-Q plots comparing gold grades from ID2 and OK models showed a bias of higher grades towards the ID2 models, which is expected due to the “bulls-eye” effect inherent in most ID2 models. Whenever reliable OK models were calculated, they were used over ID2 models. SWATH plots were also created, which compare the spatial distribution of different models by calculating the mean grade for each “row” or “column” of cells in the model. In this case, ID2 and OK models were compared: spatial agreement was good between the two models for all zones compared; the grades were typically higher for the ID2 models, but the OK models were less erratic, indicating better averaging.

Page | 68


Holt-Holloway Property
Updated NI 43-101 Technical report

13.10

Resource Estimate and Classification

   

Resource classification was based upon both drill hole density (spacing between drill holes) and gold grade continuity. Cut-offs between the Measured, Indicated and Inferred categories were determined for each zone. The block model for each zone was viewed perpendicular to the zone, with the cells coloured by search volume. A closed string was created enclosing search volumes 1 and 2. The model was then re-coloured to show grade and the string was adjusted to enclose only areas within search volumes 1 and 2 where grade continuity was good. The string was used to “cut” an Indicated resource shape out of the low-grade mineralization envelope. The remainder of the low-grade envelope was categorized as Inferred. The Measured category was defined by “cutting” a shape from within the Inferred resource, where confidence in the grade continuity was highest. The area of the Measured category varied from zone to zone, based on past mining activity and reconciliation between the block models and mill. For example, in Zone 4 at the Holt Mine there is an established history of good reconciliation, so the majority of the Indicated shape was upgraded to Measured resources. In the Lightning Deep Zone at Holloway, resources were only classified as Measured if there was development above and below the region being classified.

   

The Measured and Indicated shapes for each zone were used to create mining shapes. Underground development and the shapes that were added to mineral reserves were removed from the resource by assigning “absent” grade to the resource model where it is intersected by those shapes, then copying only grades above 0 g/t into a new model. Remnant and unrecoverable pillars (as identified by the Mine Engineering group) were removed from the mineral resource using a similar technique. Mineral resources are reported exclusive of mineral reserves for each zone in Table 13-1.

   

In the QP’s opinion, there are no known environmental, permitting, legal, title, taxation, socio-economic, marketing, political or other relevant factors that could materially affect the mineral resources estimate.

Page | 69


Holt-Holloway Property
Updated NI 43-101 Technical report

14.0

MINERAL RESERVES ESTIMATE

   

The Mineral Reserves effective as of December 31, 2016 are summarized in Table 14-1.


  PROVEN PROBABLE PROVEN AND PROBABLE
  Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces
  (kt) (g/t) (koz) (kt) (g/t) (koz) (kt) (g/t) (koz)
HOLT 1,450 4.2 194 2,500 4.7 376 3,950 4.5 570
HOLLOWAY 0 0.0 0 57 5.7 10 57 5.7 10
Total 1,450 4.20 194 2,560 4.7 387 4,001 4.5 581

Notes
CIM definitions (2014) were followed in the estimation of Mineral Reserves.
Cut-off grades were calculated for each stope
Mineral Reserves were estimated using a long term gold price of US$1,200/oz (CDN$1,500/oz)
Mineral Reserves estimates were prepared under the supervision of P. Rocque, P. Eng
Totals may not add exactly due to rounding

Table 14-1: Mineral reserves for the Holt and Holloway properties (as of Dec 31, 2016).

In the QP’s opinion, there are no known environmental, permitting, legal, title, taxation, socio-economic, marketing, political or other relevant factors that could affect materially the mineral reserves estimate.

Page | 70


Holt-Holloway Property
Updated NI 43-101 Technical report

15.0

MINING METHODS

   
15.1

Holt

   
15.1.1

Design Criteria

   

Mining activities at the Holt mine occur in multiple zones concentrated in two regions within the mine. The western region of the mine contains Zone 4 (Upper and Lower), Zone 4 East, V-93 and West McKenna. The eastern region contains Zone 6 (Upper and Lower), Zone 7, U-100 and the remnant pillars of the C-104 Zone (Figure 15-1). All of the planned zones are accessed from existing rail haulage development headings; therefore, the equipment used in each zone remains captive. The Tousignant Zone will be mined as an autonomous zone from surface via a decline access.

   

The main accesses for all zones are concentrated on four active rail haulage levels: 435, 775, 925 and 1075. Ore is transported on these haulage levels to the shaft ore pass system. Ramp access is available between 1075 and 775 haulage levels. Zone 6 and C-104 have limited access between mining fronts. Zone 4 is accessed from both 925 and 1075 rail haulage levels, with an internal ramp system connecting the upper and lower portions of the zone.

   

Zone 4

   

Zone 4 represents the bulk of the mining since resuming operations at the Holt mine in 2010. This zone presents several design challenges due to its geometry: the zone dips at 30° to the horizontal and plunges from the east to the west at approximately 10°. The plunge, in particular, makes the installation of service raises and holes challenging. Ore passes in the zone consist of a series of conventional raises dipping at 49° that feed chutes on the 925 and 1075 haulage levels. The mining method in Zone 4 is open stoping with delayed backfill.

   

Backfill for Zone 4 will be delivered from the 775 level. A conventional raise from 775 level is in place to access the existing backfill system on the 760 level near the junction of the 775 shaft access drift and the C-104 ramp. Backfill is then transferred from a conventional raise, approximately 1,000 m to an Alimak raise from 775 level to 925 level. For stopes below 925 level, backfill is transferred approximately 250 m to another Alimak raise joining 1055 and 925 levels. Slurry for cemented backfill will be delivered to 775 level via a diamond drill hole from surface and then to 870 level through an existing diamond drill hole. Slurry to mining areas below 925 level will be delivered via additional diamond drill holes to 1020, 1005 and 990 levels as mining progresses.

Page | 71


Holt-Holloway Property
Updated NI 43-101 Technical report

Ventilation for Zone 4 is provided via a 160 m long ventilation raise from 1075 level to 925 level. Fresh air is distributed from the Shaft and fed up the 1075 Zone 4 ramp. The air is then exhausted via the 835 level to 775 level exhaust raise.

Zone 6

Zone 6 dips at 68° from the horizontal and proves much more conducive to installing services than Zone 4. Zone 6 ore will report to the 925 and 775 rail haulage levels through a series of ore passes developed with Alimak raise climbers. Chutes will be installed on both rail haulages to facilitate rail car loading. The mining method in Zone 6 is open stoping with delayed backfill. The mining method is currently being transitioned to Avoca for Upper Zone 6, and if successful, implementation will begin in Lower Zone 6.

Delivery of backfill to stopes below the 775 level will be accomplished through the development of an Alimak raise from 905 level to 775 level. Backfill will be transferred from the conventional raise developed to 760 level, as mentioned previously in the Zone 4 section above. For stopes above 775 level, backfill will be delivered from the 550 level by means of a backfill raise to be developed from the 750 sublevel.

Ventilation for Zone 6 is distributed via the 925 level and exits at 750 level for the upper portion. It is then directed to 650 level and 435 level raise for exhaust.

Zone 7

Zone 7 dips at 65° from the horizontal and similar to Zone 6, proves much more conducive to installing services than Zone 4. Ore from Zone 7 will report to the 435 rail haulage level and 580 m loading pocket. The mining method in Zone 7 is open stoping with delayed backfill.

The fresh air for this zone is directed from surface via a 2.4 m diameter FAR to 350 level and then to 435 level, where the entire zone is ventilated and the later exhausted via two RARs.

Tousignant

The Tousignant Zone is located 3.5 km to the west of the Holt shaft and approximately 2 km west of the westernmost extents of Zone 4 underground workings. Tousignant extends from surface to a vertical depth of approximately 150 m. The ore body is shallow dipping (approximately 20° from the horizontal) and is composed of two lenses. There is a sub-vertical component to the ore body located to the north of the two flatter lenses; additional diamond drilling is needed to upgrade this vertical component to measured or indicated resources. As a result, the sub-vertical lens (i.e. inferred resources) was not included in the mine plan. Infrastructure, such as power line extensions, security building, etc. will need to be constructed as part of the project. Initial clearing of the road from the portal to the mill has commenced. Ore will be trucked from the stopes to surface and transferred to the Holt mill via surface trucks.

Page | 72


Holt-Holloway Property
Updated NI 43-101 Technical report

15.1.2

Mining Shapes

   

Mineral resources were modelled in 3D using Datamine Studio 3. Mining shapes were then created within the Measured or Indicated Resource shapes on sections.

   

The block model was then run against the mining shapes. Dilution and mining extraction were then applied. Finally, each resulting shape was assessed independently and only the shapes that returned a positive operating cash flow were included in the mineral reserves.

Page | 73


Holt-Holloway Property
Updated NI 43-101 Technical report

15.1.3 Mining Method
   

The primary stoping method at the Holt Mine is mechanised long hole drilling and blasting within the mining blocks with rail transport to the shaft ore passes. The spacing between sublevels for long hole stoping varies between 20 m and 17 m, depending on the dip of the ore. Mechanized long hole stoping is planned to be used in all zones at the Holt mine. “Drift and pillar” stoping may be needed in some areas where the ore is too shallow and not amenable to long hole methods. Drilling is performed with top- hammer drills, with hole sizes ranging from 64 mm to 76 mm in diameter.

 

 

The Tousignant Zone is planned to be mined with modified room and pillar.

 

 

Zone 4

 

 

Zone 4 is a large ore zone dipping at approximately 30° from the horizontal and is located on the western extremity of the Holt mine. The zone is bounded by the C-97 mining block on the east and is located between 1075 level and 775 level. Mineral reserves for Zone 4 (including Zone 4 East) are estimated at 1.35 million tonnes grading at 4.07 g/t.

 

 

Zone 4 is accessed by mechanised equipment via ramps and sublevels connected to two main rail haulage levels 925 and 1075. Zone 4 is divided into two mining blocks: the upper mining block represents the stopes reporting to the 925 haulage level and the lower mining block represents the stopes reporting to the 1075 haulage level. The use of both haulage levels provides increased flexibility to the overall Holt mine plan.

 

 

The mine extraction sequence for Zone 4 is using a primary-secondary stoping arrangement with cemented rock fill being used in the primary stopes. Strike length is set at 15 m for the primary stopes and 20 m for the secondary stopes. Sublevels in Zone 4 are spaced 17 m apart due to the shallow dipping nature of the ore within the zone. The current mine plan includes stopes being mined using up holes, with the remainder of the stopes being mined using down holes. This method of combining up and down hole configurations helps minimize hole length and increases accuracy of hole drilling. A typical production ring section is shown in Figure 15-2.

 

 

A dilution factor of 15% was applied to mining shapes. Dilution material was assigned a grade of 0.3 g/t. Mining extraction was set at 90%. Cable bolts will be used in the stope hanging wall to help mitigate dilution.

Page | 74


Holt-Holloway Property
Updated NI 43-101 Technical report

Zone 6

Zone 6 is a steeply dipping ore body located on the east side of the Holt mine, centered near the 10850 easting coordinate. The mineral reserves for Zone 6 (including Zone 6B) are estimated at 809,500 tonnes grading at 4.92 g/t.

Zone 6 is planned to be accessed via a ramp system and sublevels spaced at 20 m intervals for “conventional long hole” stoping. Accesses will be connected to haulage levels on 925, 775 and 1075 via drifts and ore passes.

The mine extraction sequence for Zone 6 is using a primary-secondary stoping arrangement with cemented rock fill being used in the primary stopes. The strike length is set at 20 m for all stopes (primary and secondary). The delivery of cemented rock fill to the upper portion of the zone will be initiated from the 435 level cement plant. From here a slurry hole has been drilled down to 775 level backfill system, which will deliver cement to the lower portion of the zone. Secondary stopes are planned to be filled with rock fill produced during development of the ramp and footwall drifts.

Upper Zone 6 is currently transitioning to the Avoca mining method for the extraction of its reserves. If proven to be viable, it is expected that this mining method will be incorporated into the lower portions of the zone.

Page | 75


Holt-Holloway Property
Updated NI 43-101 Technical report

Ore will report to one of three rail haulage levels (775, 925, or 1075 level, depending on the stopes elevation) via an internal ore pass system. Ore will then be trammed on rail to the shaft ore pass system.

Page | 76


Holt-Holloway Property
Updated NI 43-101 Technical report

Zone 7

Zone 7 is a steeply dipping ore body located on the eastern most side of the Holt mine (Figure 15-4). The mineral reserves for Zone 7 are estimated at 1.06 million tonnes grading at 4.49 g/t.

Zone 7 is planned to be accessed via a ramp system and sublevels spaced at 20 m intervals for open stoping. Accesses will be connected to the 435 haulage level via drifts and ore passes.

The mine extraction sequence for Zone 7 is using a primary-secondary stoping arrangement similarly to Zone 6. Cemented rock fill being will be used in the primary stopes and secondary stopes will be filled with rock fill produced during development of the ramp and footwall drifts. The strike length is set at 20 m for all stopes (primary and secondary). The delivery of cemented rock fill to the upper portion of the zone will be initiated from the 435 level cement plant.

Ore will report to the 435 rail haulage level and subsequently to the 580 m loading pocket.

Page | 77


Holt-Holloway Property
Updated NI 43-101 Technical report

V-93 Zone

   

V-93 is a steeply dipping ore body located to the south of Zone 4 and above 775 level on the west end of the mine. The mineral reserves for V-93 are estimated at 100,184 tonnes grading at 4.59 g/t.

   

V-93 Zone is planned to be accessed from a ramp system connected to the 775 level with sublevels spaced at 20 m intervals. The zone is planned to be mined using longitudinal long hole retreat method. The stopes will be backfilled using cemented rock fill from the planned 775 level backfill system. Rock fill will be provided from development headings or could be trammed from Zone 6 development when available.

   
15.1.4

Geomechanical

   

Reports by Golder Associates related to the Holt Mine and dated from 1994 to 1999 are available on site. These reports provide relevant background information but are for the most part related to older areas of the mine, which will only be subject to some remnant mining. Ground Control reporting from Golder Associates resumed in 2013 and continued into 2016, these were mainly focused on annual site visits and sill pillar extraction. All future reporting will be completed in house. No adverse ground conditions have been reported throughout the mine. The planned mining methods all incorporate backfill or pillars and the stope dimensions are based on local experience.

   

Hanging wall support of longhole stopes are planned on a stope by stope basis. Based on the outcome of empirical analysis (i.e. Stability Graph) or geological information, hanging wall support may be required. In this case, 7 m long cable bolts (typically) will be installed.

   

Ground support in ore headings typically consists of 1.8 m friction bolts (e.g. Split Sets) in the walls (Figure 15-5), 1.2m friction bolts in waste headings, (Figure 15-6) installed on a 1.2 m by 1.2 m square pattern and alternating rows of 1.2 m mechanical bolts and 1.8 m resin-grouted rebar in the back with wire mesh. In intersections and localized areas requiring extra support, 2.4 m resin-grouted rebars or 3.0 m spin cables are used in permanent locations or 3.0 m swellex for temporary headings.

Page | 78


Holt-Holloway Property
Updated NI 43-101 Technical report

Page | 79


Holt-Holloway Property
Updated NI 43-101 Technical report

15.1.5

Mine Access and Development

   

The Holt Mine is accessed by a single shaft, which extends to a depth of 1,195 m from surface. It has three compartments from surface to the 350 m level and four compartments to the 1,195 m level. The shaft has been deepened on several occasions. The shaft is rectangular and has timber sets and guides.

Page | 80


Holt-Holloway Property
Updated NI 43-101 Technical report

Access to planned mining areas is gained from the four main rail haulage levels: 435, 775, 925 and 1075 levels. The rail haulage drifts were developed 3 m wide by 3 m high, making access between mining zones with large equipment a difficult task. An existing main ramp system is located within the C-104 Zone and extends from 650 level to 1062 level. Sublevel accesses from the main ramp were developed by previous owners at vertical intervals of 20 m. The main ramp has shaft access on four levels: 650, 700, 775 and 925 levels. The 1075 main haulage level is connected to the main ramp system via a 2 m by 2 m raise from the 1062 level and through an internal ramp in Zone 4. A ramp system was also developed by previous owners in the C-97 zone. The C-97 ramp consists of two ramps: one is a decline from the 925 main haulage and extends to the 970 level, the other is an incline extending from 1075 level to 1010 level. For both ramp systems, there is no connection between the 1075 haulage level and the haulage levels above.

An internal ramp system has been developed in Zone 4 from the 925 haulage level and the 1075 haulage level. The Zone 4 ramp below 1075 level will be mined to accommodate 30 tonne trucks for reserve extraction. The internal ramp system established in Zone 6 connects 775 level to 610 level for the upper portion and is planned to connect the 925 and 775 haulage levels for the lower portion. The system will not include a connection between 1075 level and the haulage levels above.

The Tousignant Zone is planned to be accessed via a portal and decline ramp, which will be located approximately 3 km west of the Holt shaft. A main ramp is planned to be developed in ore through lens 1 to access mining areas and in lens 2, thus minimizing development costs. Mining will retreat from the deeper area (i.e. lens 2) to the shallower area (i.e. lens 1), progressively losing the ramp access to the bottom area.

Development requirements are shown in Table 15-1 and Table 15-2.

  Year 2017 2018 2019 2020 2021 2022 2023 2024 2025 Total
     Total Capital Dev 6,521 6,646 7,015 7,385 6,304 6,304 6,304 6,304 2,306 55,087
  Total Operating Dev 4,997 5,094 5,377 5,660 5,660 5,660 5,660 5,660 5,660 49,424
  Total Development 11,518 11,740 12,392 13,044 11,963 11,963 11,963 11,963 7,965 104,511

Table 15-: Holt Mine development requirements.

Year Year 1 Year 2 Total
Total Capital Development 1,154 2,306 3,460
Total Operating Development 1,036 5,660 6,696
Total Development 2,190 7,965 10,155

Table 15-2: Tousignant Zone.

Page | 81


Holt-Holloway Property
Updated NI 43-101 Technical report

15.1.6

Capital Development

   

Details of capital development are listed in Table 15-3 and Table 15-4.


    2017 2018 2019 2020 2021 2022 2023 2024 2025 Total
  Ramps 1,765 1,799 1,899 1,999 1,706 1,706 1,706 1,706 624 14,912
  Raising 530 540 570 600 512 512 512 512 187 4,477
  Lateral 4,226 4,307 4,546 4,785 4,085 4,085 4,085 4,085 1,494 35,698
  Total 6,521 6,646 7,015 7,385 6,304 6,304 6,304 6,304 2,306 55,087

Table 15-3: Capital development at Holt Mine.

  Year 1 Year 2 Total
Ramps 312 624 937
Raising 94 187 281
Lateral 748 1,494 2,242
Total 1,154 2,306 3,460

Table 15-4: Capital development at Tousignant.

   
15.1.7

Operating Development

   

Details of operating development are listed in Table 15-5 and Table 15-6.


    2017 2018 2019 2020 2021 2022 2023 2024 2025 Total
  Lateral 4,292 4,375 4,618 4,861 4,861 4,861 4,861 4,861 4,861 42,451
  Raising 705 719 759 798 798 798 798 798 798 6,973
  Total 4,997 5,094 5,377 5,660 5,660 5,660 5,660 5,660 5,660 49,424

Table 15-5: Operating development at Holt Mine.

  Year 1 Year 2 Total
Lateral 890 4,861 5,751
Raising 146 798 945
Total 1,036 5,660 6,696

Table 15-6: Operating development at Tousignant.

Page | 82


Holt-Holloway Property
Updated NI 43-101 Technical report

15.1.8

Equipment

   

The list of major mobile equipment is shown in Table 15-7. The 3.5 yd3 Load-Haul-Dump (LHDs) and single boom jumbos will be the primary development and production units at the Holt Mine followed by the locomotives and four tonne rail cars for the transport of the ore to the shaft. Mucking machines are used for track drifting development. Approximately 80% of the locomotives and batteries were replaced with AC units. It may be necessary to replace additional locomotives and batteries at the Holt Mine as the need arises.

Page | 83


Holt-Holloway Property
Updated NI 43-101 Technical report

EQUIPMENT # EQUIPMENT DESCRIPTION/MODEL EQUIPMENT # EQUIPMENT DESCRIPTION/MODEL
MNCR018 KUBOTA RTV 900XT MANCARRIER SLFT410 WALDEN SCISSOR TRUCK
MNCR019 KUBOTA RTV X900 MANCARRIER SLFT412 MARCOTTE SCISSOR TRUCK
MNCR020 KUBOTA RTV X900 MANCARRIER MNCR425 KUBOTA MANCARRIER
MNCR022 KUBOTA RTV X900 MANCARRIER SLFT428 WALDEN SCISSOR TRUCK
MNCR023 KUBOTA RTV X900 MANCARRIER SLFT433 WALDEN SCISSOR TRUCK
MNCR026 KUBOTA RTV X900 MANCARRIER MNCR512 KUBOTA MAN CARRIER M6800
MNCR027 KUBOTA RTV X900 MANCARRIER MNCR521 UT99 Man Carrier
MNCR028 KUBOTA RTV X900 MANCARRIER FKLT577 KUBOTA MNEMASTER FORKLIFT R420
MNCR030 KUBOTA RTV X900 MANCARRIER FKLT578 KUBOTA MNEMASTER FORKLIFT R520
MNCR031 KUBOTA RTV X900 MANCARRIER FKLT579 KUBOTA MNEMASTER FORKLIFT R420
MNCR032 KUBOTA RTV X900 MANCARRIER FKLT584 MINECAT FL6000
JMBO101 MTI JUMBO CDJ120/HC80 DIESEL WELDER MILLER WEDLING MACHINE
JMBO102 MTI JUMBO CDJ120/HC80 DIESEL WELDER MILLER WEDLING MACHINE
JMBO104 MTI JUMBO CDJ120/HC80 DIESEL WELDER MILLER WEDLING MACHINE
JMBO105 MTI JUMBO CDJ120/HC80 Rock Breaker1020 Teledyne Rock Breaker
JMBO112 Copco S1D Rock Breaker900 Teledyne Rock Breaker
107Boart Boart Longyear Air Buggy Rock Breaker 750 Teledyne Rock Breaker
SCOP200 2 YARD ST2D LONGTOM #1 Longtom Air Drill
SCOP202 2 YARD JCI250M LONGTOM #2 Longtom Air Drill
SLFT300 MARCOTTE SCISSOR TRUCK LONGTOM #3 Longtom Air Drill
HLTK307 SANDVIK EJC 416 HAUL TRUCK LM56 Muck Machine
HLTK313 COPCO MT2010 HAUL TRUCK LM70 Muck Machine
BH007 KUBOTA DITCH DIGGER KX41-3V LM70 Muck Machine
BH015 KUBOTA DITCH DIGGER KX41-3V Loci 01 Single Locomotive
BH017 KUBOTA DITCH DIGGER KX41-3V Loci 02 Single Locomotive
RB009 KUBOTA ROCK BREAKER KX057-4 Loci 03 Single Locomotive
RB011 KUBOTA ROCK BREAKER KX080-3 Loci 06 Single Locomotive
SCOP351 WAGNER SCOOP ST3.5 Loci 07 Single Locomotive
SCOP354 WAGNER SCOOP ST3.5 Loci 08 Single Locomotive
SCOP355 WAGNER SCOOP ST3.5 Loci 09 Single Locomotive
SCOP357 WAGNER SCOOP ST3.5 Loci 010 Single Locomotive
SCOP358 WAGNER SCOOP ST3.5 Loci 011 Single Locomotive
SCOP359 SCOOP 3.5 Caterpillar – R1300 Loci 013 Single Locomotive
SCOP361 WAGNER SCOOP ST3.5 Loci 014 Single Locomotive
SCOP363 SCOOP 3.5 Caterpillar – R1300 Loci 015 Single Locomotive
SCOP364 SCOOP 3.5 Caterpillar – R1300 Loci 017 Single Locomotive
SCOP365 SCOOP 3.5 Caterpillar – R1300 Loci 018 Single Locomotive
SCOP366 SCOOP 3.5 Caterpillar – R1300 Loci 019 Single Locomotive
SCOP368 SCOOP 3.5 Caterpillar – R1300 Loci 020 Single Locomotive
SCOP383 SCOOP 3.5 Caterpillar – R1300 Loci 021 Single Locomotive
SCOP384 SCOOP 3.5 Caterpillar – R1300 Loci 022 Single Locomotive
SCOP401 JCI SCOOP 2.5 YARD Loci 0112 Single Locomotive
    Loci 0114 Single Locomotive
    Loci 05 Mansha Locomotive
    Loci 12 Mansha Locomotive
    Ore Car - 74 Cars 4 Ton Ore Cars

Table 15-7: Major mobile equipment at Holt.

Page | 84


Holt-Holloway Property
Updated NI 43-101 Technical report

15.1.9 Production Rate and Life of Mine Plan
   
Production from the Holt Mine will increase from 1,350 tpd to 1,500 tpd over the next few years. For 2017 and 2018, production will rely heavily on Zone 4 and Zone 6.
   
Zone 4 ore is delivered to the lowest loading pocket in the mine located on 1145 m. Zone 6 ore will report, to the 890 m loading pocket; skipping time will be greatly reduced and will allow for the production rate increase. Zone 7 ore is planned to be delivered to the 580 m loading pocket. An average mining rate of 1,400 tpd is planned over the seven and a half year mine life (based on mineral reserves only). As additional mining areas become available, the production rate will increase to approximately 1,500 tpd. Since the Holt Mine is currently in production, no additional time is needed for activities typically associated with operation start up.
   
The Life of Mine plan (LOM) for the Holt Mine is shown in Table 15-8. The LOM plan for the Tousignant Zone is shown in Table 15-9.

    2017 2018 2019 2020 2021 2022 2023 2024 Total
  Tonnes (kt) 483 493 520 548 548 548 548 447 4,134
  Grade 4.73 4.42 4.45 4.37 4.39 4.41 4.43 4.37 4.44
  Ounces (koz) 74 70 74 77 77 78 78 63 591
  Mining rate (tpd) 1,324 1,350 1,425 1,500 1,500 1,500 1,500 1,500 1,415

Table 15-8: Holt Mine LOM plan.

  2024 2025 Total
Tonnes (kt) 100 200 301
Grade 5.50 5.50 5.50
Ounces (koz) 18 35 53

Table 15-9: Tousignant Zone LOM plan.

15.2

Holloway

   

Mining activities at the Holloway mine were curtailed at the end of 2016 and the operation was placed on temporary suspension. Some of the mobile equipment was brought up to surface and redeployed to other KLG operations. Similarly, most of the personnel were re-assigned to other KLG operations.

Page | 85


Holt-Holloway Property
Updated NI 43-101 Technical report

KLG is planning to embark on an exploration campaign, both on surface and underground at the Holloway mine.

Pending successful outcome from the exploration program, it is anticipated that the operation will be re-started in the upcoming years.

Page | 86


Holt-Holloway Property
Updated NI 43-101 Technical report

16.0

RECOVERY METHODS

   

The following sections are copied (and updated) from the previous technical report (Cater and Salehi, 2015). A summary is presented in the following sub-sections. No material changes occurred since the last technical report was filed in 2015

   
16.1

Process Plant Flow Sheet

   

The Holt Mill was constructed in 1988 and was originally designed for a throughput of 1,360 tpd. Expansions in 1988 and 2001 increased the throughput to 2,500 tpd and 3,000 tpd, respectively.

   

Surface ore storage is a total of 4,900 t in three silos, the Holt headframe bin (900 t) and two other separate storage bins (1,000 t and 3,000 t). Ore can be delivered to the mill from the Holt Mine by conveyor or from a separate surface dump that enters a 100 tonne hopper, and then can be fed to either of the two storage bins.

   

The grinding circuit consists of a 5 m diameter by 6.1 m long Allis Chalmers ball mill, converted to a SAG mill, a 4 m diameter by 5.5 m long Allis Chalmers ball mill and a 3.6 m diameter by 4.9 m long tertiary ball mill, all operating in series and in closed circuit. The details of the grinding circuit are shown below in Table 16-1. The grinding circuit is controlled by a Wonderware system and Modicom programmable logic.

   

The primary cyclone cluster consists of six 381 mm (15”) Krebs D15B cyclones. A secondary cyclone cluster consists of twelve 254 mm (10”) Krebs gMAX cyclones with an Outokumpu PSI-200 online analyzer. The secondary cyclone cluster feeds a 27 m (90 ft) Eimco thickener. The thickener underflow feeds a pre-aeration tank, which gravity feeds five carbon-in-leach (CIL) tanks in series. The tank system is conventional gravity flow for slurry with counter-current carbon advancement

   

Precious metal stripping is performed in batch operations, advancing 2.7 t of loaded carbon through a 1.2 m by 2.4 m (4 ft x 8ft) Simplicity screen. Carbon is transferred to an adsorption column where a Zadra process is utilized as the gold elution method. Barren solution is circulated through two shell and tube heat exchangers and a 360 kW electric inline heater.

   

The resulting pregnant solution is pumped from the solution tank to an electro-winning cell. The gold precipitate is further refined using a 125 kW Inductotherm furnace and the doré bars are poured in a seven mould cascade arrangement. After stripping, the carbon is regenerated in a rotary kiln, quenched, screened and returned to the process. Carbon fines are collected in a tank, filtered in a Perrin press, and packaged for sale.

Page | 87


Holt-Holloway Property
Updated NI 43-101 Technical report

The process flow sheet is shown in Figure 16-1.

Reagents and operating supplies for the mill, such as process chemicals and grinding steel, are stored in the reagent storage building attached to the concentrator at the south end of the building.

Laboratory

The assay laboratory is located at the Holt site in an area near but separate from the mill and previously used as an assay lab. The building was renovated and a sample preparation area, fire assay facilities and an AA facility were established to provide analytical services for the site.”

Data Primary Secondary Tertiary
  SAG mill Ball mill #1 Ball mill #2
Diameter (m) 5.0 4.0 3.6
Length (m) 6.1 5.5 4.9
Motor (hp) 3,400 1,650 1,250
Ball charge (%) 8-12 45 40
Grinding media 5" balls 2" balls 1" balls
Media consumption (kg/t) 0.75 0.30 0.45
Speed (rpm) 13.9 16.2 17.3
Critical speed (%) 72.5 76.5 71.0
Circulating load (%) 10-15 350 225
Power draw (kWh) 2,250 1250-1450 750-900
Lifters Polymet Rubber Rubber
Liners Polymet Rubber Rubber
Discharge grates (mm) 18-30 mm Overflow mill  
    by 40 mm     

Table 16-1: Details of the grinding circuit.

Page | 88


Holt-Holloway Property
Updated NI 43-101 Technical report

In the QP’s opinion, there are no processing factors or deleterious elements that could have a significant effect on potential economic extraction at the Holt-Holloway mines.

Page | 89


Holt-Holloway Property
Updated NI 43-101 Technical report

17.0

PROJECT INFRASTRUCTURE

   
17.1

HOLT

   
17.1.1

Surface Buildings

   

Surface buildings at the Holt property were erected by previous owners. The main ones are:


  A security gate house;
     
  A hoist house;
     
  A headframe;
     
  Administration building (housing Engineering, Geology, Operations, Administration, two dries and conference rooms);
     
  Surface Maintenance Shop and offices;
     
  Assay lab building;
     
  Exploration Trailer;
     
  Mill building (including two bins, conveyor and thickener);
     
  Surface sub-station and control room;
     
  Various storage buildings;
     
  Backfill Plant and Silos; and,
     
  A scale house.

The Holt surface general layout is shown in Figure 17-1.

Page | 90


Holt-Holloway Property
Updated NI 43-101 Technical report

17.1.2

Road Upgrade and Ore Transportation

   

Ore from the Holt Mine is dumped directly into the surface ore bins from the skips via a conveyor belt. Construction of an approximately 3 km long haulage road will need to occur once the Tousignant project commences. The road will start at the portal and end at the grizzly already established near the Holt Mill.

   
17.1.3

Power

   

Power is supplied from the provincial electrical grid and is delivered to transformers for the mine and mill at Holt. The site has a limited amount of emergency standby diesel generation capacity to maintain critical items in the mine and mill. There is one 800kW generator at the Holt Mine and the backup transformer located on surface (1,150V to 4,160V), which has recently been replaced.

Page | 91


Holt-Holloway Property
Updated NI 43-101 Technical report

The underground is serviced by two feeders. Power is supplied to the mine and distributed at 4,160 V with 4,160 V/600 V transformers as needed, to supply areas. The feeder cables have been expanded to Zone 4,Zone 6 and Zone 7.

   
17.1.4

Underground Mine Dewatering and Fresh Water Requirements-pierre to check

   

Fresh Water

   

Water from the abandoned upper workings is directed via a ditch flow and a series of drain holes to a dam located on the 400 m level and the 530 discharge pump staging level. All required clean water below the 400 level is supplied by the dam, and excess water is sent to the pump staging area on 530 level.

   

Dewatering

   

All active heading water discharge is directed via a series of drain holes to a clean and dirty water sump complex in each mining area. Excess fine particles are removed from the dirty water sumps by LHDs. Clean water from these sumps is pumped by air or electric pumps. The water is discharged to each level’s main sump. From the main sumps water is pumped by electric pumps to the 1110 m Geho pump dam or the 1075 m Jet pump underground reservoir.

   

The 1110 m Geho pump discharges to the 530 m pump staging area at a rate of 35 m3/h and can handle up to 60% solids. The 149 kW (200 hp) 1075 m jet pump is a backup system for the Geho and can pump up to 40 m3/h of clean water. It also discharges to the 530 m pump staging area.

   

All discharge water from the Geho or Jet pump report to a cone sump on the 530 m level. A flocculent is added to the cone sump to precipitate solids to the bottom of the sump. These solids are then pumped via a SLR pump to abandoned stopes in the south zone. The clean water overflow is pumped to surface via two 149 kW (200 hp) Jet pumps capable of pumping 40 m3/h each.

   

Total mine discharge averages 800m3/day to 1,500 m3/day.

   
17.1.5

Underground Mine Ventilation

   

Primary ventilation at Holt is delivered by a 3-stage push-pull system, as described in Table 17-1.

Page | 92


Holt-Holloway Property
Updated NI 43-101 Technical report

Stage Power Location
1st Stage 250 hp Surface fresh air raise
  125 hp Surface fresh air raise
2nd stage 100 hp 650 Level
  100 hp 650 Level
  75 hp 700 Level
3rd stage 250 hp Surface return air raise
  125 hp Surface return air raise

Table 17-1: Primary ventilation system at the Holt Mine.

   

The primary ventilation system delivers a total airflow of 117 m3/s to the underground workings. Both fresh air raise intake fans are equipped with propane burners (capacity of 117 MWh or 40 MBTU), which are used to heat the mine air during winter. The 186 kW (250 hp) surface fresh air fan feeds a 3.0 m diameter fresh air raise (FAR) to the 350 m level. The 93 kW (125 hp) surface fresh air fan feeds a 1.8 m diameter FAR to the 300 m level. Fresh air then travels through a series of raises to the 775 m level and is directed to the bottom of the mine (1075 level) via the shaft.

   

At the 925 m level, the fresh air stream splits: the first air stream ventilates the mining areas of Upper Zone 6, while the second air stream ventilates the mining areas of Zone 4.,

   

Both air streams join and ascend the C-104 ramp and stopes to the 2nd stage fans. After the 2nd stage fans, the air ascends raises to the 435 m level, 350 m level, and upwards to the 3rd stage Return Air Raise (RAR) fans.

   
17.1.6

Underground Material Handling

   

Ore and Waste Handling

   

In Upper and Lower Zone 4 and in Zone 6, ore and waste from development headings are mucked with 3.5 yd3 LHDs. Stope ore is mucked via remote controlled 3.5 yd3 LHDs. The ore and waste is dumped into an ore or waste pass system. Waste is re-mucked into excavated stopes and used as back fill. Ore is re-mucked with another 3.5 yd3 LHD and loaded into the central ore pass system with grizzlies and rock breakers. It will then be pulled from a chute into ore cars.

Page | 93


Holt-Holloway Property
Updated NI 43-101 Technical report

Muck is transported from the active zones on 40 lb rail using tandem five ton Warren Loci’s and five ton ore cars. These tandem Loci’s can pull as many as eight ore cars at a time.

   

This muck is dumped using a Teledyne car dumpers near the shaft stations into the main ore pass, which reports to the 1110 crusher where the muck is reduced to an appropriate size for the mill grinder. From the crusher the muck is sent to the 1145 loading pocket where it is skipped to surface in eight ton skips.

   

The ore from Zone 6 will be transported by the same system but will report the 825 crusher and then to the 890 loading pocket.

   

Material Handling

   

Supplies required daily are sent underground via flat cars. Fuel and oils are sent via fuel/oil tanks mounted on flat cars and pumped into satellite fueling stations. All supplies are trammed to the active headings via locomotives.

   

Large gear and equipment are stripped down to fit in the shaft and are slung under the cage and re-assembled in the underground shops.

   
17.1.7

Communications

   

The communication network allows interfacing between the telephone system and the fibre optic system for all underground shops. A site-wide leaky feeder communication system has been installed. Communication facilities include site wide two-way radios, underground and surface paging phones, digital telephone service to offices and specific areas underground, and a cellular phone for the security staff.

   
17.2

HOLLOWAY

   

The Holloway mine was placed on temporary suspension at the end of 2016. The information contained in the previous technical report( Cater and Salehi, 2014) has not changed.

Page | 94


Holt-Holloway Property
Updated NI 43-101 Technical report

18.0

MARKET STUDIES AND CONTRACTS

   
18.1

Market for the Product

   

The QP has reviewed KLG contract with the refiner and he is satisfied that the contract reflects industry norms and reasonable market terms for selling Holt and Holloway gold production.

   
18.2

Material Contracts

   

Contract surface exploration drilling services are provided by Asinii Drilling based in Matheson, ON. Underground contract drilling at the Holt mine is being conducted by Boreal Drilling based in Val d’Or (QC). Both contractors possess the necessary equipment, well trained personnel, replacement part inventory and have well documented drill experience on the property. These contracts can be discontinued by KLG at any time with advance written notification.

   

Explosives products are provided by Nordex. The main products used are: ANFO, cartridge explosives and detonators.

   

Security services at the Holt and Holloway sites are provided by Garda. Security personnel are always available on site, 24 hours per day.

   

Contracts are awarded through a tender process. The duration of the contracts is usually less than two years.

Page | 95


Holt-Holloway Property
Updated NI 43-101 Technical report

19.0

ENVIRONMENTAL STUDIES, PERMITTING, AND SOCIAL OR COMMUNITY IMPACT

   

The Holt-Holloway mine site utilizes an Environmental Management System (EMS). This system embodies a recurrent review process of site environmental policies and procedures, permits and approvals. The EMS system repeatedly audits and sustains waste and hazardous waste management, recycling, landfill management, water and wastewater treatment and monitoring programs throughout the site.

   

This process is kept current though EMS revisions included as part of the continuous improvement review cycle. The EMS thus forms the basis for the monitoring, sampling, and reporting program requirements under each of the pertinent governmental agencies. More importantly, this allows verification that all the activities at the Holt and Holloway mines comply with government and company standards.

   

The Holt and Holloway mines utilize underground and surface water as part of the mining and milling process, in addition to domestic consumption. Water is collected, monitored, treated and released through an approved, regulated permitted industrial sewage works. All effluent discharge to the environment from the Holt and Holloway mines is controlled and monitored.

   
19.1

Summary of Environmental Studies

   
19.1.1

Terrestrial Environment

   

Surveys have been undertaken to provide further details on terrestrial vegetation and wildlife in areas that may be affected by mining activity, such as in the vicinity of the overburden and waste rock storage piles. Depending on the final detailed designs, additional studies may be undertaken.

   
19.1.2

Hydrogeological Characterization

   

Regional Surface Water Hydrology

   

Holt (Shaft #3)

   

The Holt Mine traverses two drainage systems, the Mattawasaga River system to the north and the Magusi River system to the south. The mine and mill site drains into the Mattawasaga River, which has an upstream drainage basin of approximately 45 km2. The Tailings Management Facilities (TMF) area drains into the Magusi River system, which has a drainage basin of approximately 215 km2. Both systems carry heavy suspended solids loading during high water, owing to the prevalence of clay and silt substrates.

Page | 96


Holt-Holloway Property
Updated NI 43-101 Technical report

Water Survey of Canada stream flow records for two non-regulated watercourses (the Porcupine River - watershed area of 410 km2 near Timmins - and the Blanche River - watershed area of 1,780 km2 near Englehart) are available to calculate average runoff yield for the region. For the period between 1977 and 1993, the mean annual runoff was measured at 439.0 mm for the Porcupine River at Hoyle, and 400.5 mm for the Blanche River above Englehart. The average runoff value from the two watersheds is 420 mm.

The majority of runoff occurs in the spring, coincident with the snow melt. A second, much smaller, runoff peak typically occurs in October or November. Lowest runoff conditions normally occur during the mid-winter months (January through March), when precipitation is accumulated and held as snow and ice. A second period of relatively low flow occurs in mid to late summer.

Holloway (Shaft #2)

The Holloway project site straddles two watersheds: the Lightning River watershed and the Mattawasaga River watershed, both of which drain into Lake Abitibi.

Water pumped from the Holloway Mine is discharged into a polishing pond system. The decant in the polishing pond system allows the clarified mine water to either be discharged through a MISA control point into the Lightning River watershed. Alternatively, it can be pumped through a pipeline into the Holt Tailings Management Facility (TMF) permitted municipal industrial sewage works.

Surface runoff from the Holloway mine site drains south to the Mattawasaga River watershed.

Mine discharge contributes approximately 250 m3/day during normal operations. The baseline flow is estimated at 150 m3/day during periods without mining operations.

Results of a baseline study suggest that the flow in the Lightning River averaged 2,500 m3/day. This provides a minimum dilution ratio of 10:1 during normal operations and 16.7:1 during temporary suspension or inactivity.

The hydrological characteristics of the Lightning River watershed drains an area of 105 km2, directly to the north and encompassing a portion of the project site. There are three main tributaries, Trollope Creek and two un-named branches (Branch 1 and Branch 2), which drain the western and southern portions of the watershed.

Page | 97


Holt-Holloway Property
Updated NI 43-101 Technical report

The upper system is characterized by a hydrograph, which peaks rapidly in response to rainfall and snow melt events.

Very little base flow is evident in the system and can be related to the predominance of relatively impervious clay solids with a high run-off coefficient and limited groundwater inputs.

The Mattawasaga watershed drains an area of 45 km2, opposite the mine site, and is of strongly meandering form and low gradient.

Surface Water Quality Pre-Development Conditions

In general, the pre-discharge conditions for the Magusi and Mattawasaga rivers are characterized by brown coloured water imparted by humic acids and turbid conditions. Suspended solids levels range from lows of less than 5 mg/L during periods of ice cover and low flows, to highs in the range of 30 mg/L to 60 mg/L during high flow conditions. Elevated suspended solids values are characteristic of local rivers flowing over a predominantly clay and silt substrate.

Closely associated with elevated suspended solids levels are high background concentrations of iron. Average iron concentrations during the pre-discharge monitoring period ranged from 0.90 mg/L to 1.55 mg/L. These background levels are higher than the Provincial Water Quality Objective (PWQO) for iron of 0.3 mg/L, but are typical of local river systems.

Copper concentrations in the Magusi and Mattawasaga Rivers during the pre-discharge period were also characteristically high, ranging from 0.001 mg/L to 0.044 mg/L, frequently exceeding the PWQO value of 0.005 mg/L. Concentrations of nickel were generally low and below the PWQO objective of 0.025 mg/L. Zinc concentrations fluctuated markedly throughout the year with mean values of 0.008 mg/L to 0.025 mg/L, with values exceeding occasionally the PWQO value of 0.030 mg/L. Arsenic concentrations were quite low, being less than 0.02 mg/L and generally less than 0.002 mg/L.

High variability in water temperature was observed, with spring and summer temperatures reaching 24°C in May 1991. Dissolved oxygen levels were between 7 mg/L and 12 mg/L, which are consistent with what might be expected in a northern watershed. Turbid conditions were observed on the Lightning River with Secchi depth measurements of 7 cm to 49 cm. Branch 1 was notably clearer, with Secchi depths of up to 50 cm to 70 cm.

Page | 98


Holt-Holloway Property
Updated NI 43-101 Technical report

Streams in the project vicinity are described as neutral to slightly acidic, with pH values ranging between 5.5 and 8.3. Only three samples taken during field sampling were outside of the PWQO values of between 6.5 and 8.5. Alkalinity ranged from 3 mg/L to 180 mg/L, while hardness ranged from 17 mg/L to 162 mg/L.

   

Nitrogen content, (in the form of nitrite, nitrate, Total Kjeldahl Nitrogen and total ammonia), was measured at all stations. Ammonia concentration tended to increase during winter months when ice cover leads to lower oxygen levels.

   

All monitoring stations along the Lightning River during the baseline study showed iron levels greater than the PWQO of 0.3 mg/L. The average iron concentration was 1.6 mg/L, ranging from 0.54 mg/L to 11 mg/L. These levels are naturally occurring and are common in northern Ontario. They are commonly associated with high suspended solids levels. Suspended solids levels ranged from less than2 mg/L to 44 mg/L.

   
19.1.3

Hydrological and Aquatic Habitat Assessments

   

Hydrological assessments in the past were in large part developed by pro-rating regional flow data to the local watershed areas. Current studies are focusing on developing more accurate estimates of stream flows, runoff volumes and site drainage patterns associated with the existing mine site and future developments. Efforts include detailed watershed mapping initiatives, as well as the development of a stream flow monitoring station on the Magusi River. This information will be important in assessing potential adverse environmental effects to the downstream aquatic receiving environment and assisting in storm water management planning activities. Aquatic habitat assessments undertaken in the past were based on data collection initiatives recommended in prior studies, in the context of the proposed project, and additional sampling of stream sediments, water chemistry and benthic macro invertebrates were also undertaken. As well, future aquatic assessment programs will be expanded to include areas that could potentially be affected by future mining activity. Of particular importance is the thorough assessment of potential fisheries habitat areas in the areas of proposed mine development.

   
19.1.4

Waste Characterization Studies

   

A comprehensive geochemical characterization of all mine waste materials is to be completed to support the development of an integrated water and waste management plan for the site. In developing the mine model, waste and host rock materials have undergone a comprehensive geological classification to ascertain the total volumes of materials that will be generated. Representative samples from each type of waste material were selected and tested for their acid generating and metal leaching potential as per the relevant guidance documents.

Page | 99


Holt-Holloway Property
Updated NI 43-101 Technical report

19.2

Tailing Management Plan

   

Ore will be processed at the Holt mill progresses to the TMF. The TMF contains four individual basins: two tailing ponds, one sludge precipitate pond and one polishing pond. Within the tailings facilities are 18 individual dam structures, a total of 465.4 ha of watershed area and 212 ha of tailings area. The remaining storage capacity is approximately 4.56 Mt at the close of 2016. In 2016 KLG submitted an amended permit to the MOE for the implementation of Sub-Aerial stacking in the Southwest Basin of the TMF. The amendment will provide an estimated additional 2.17 Mt of storage capacity. The tailings facilities are inspected annually by an external third party and comply with current provincial and federal regulations. A plan view of the TMF is displayed in Figure 19-1.

   

KLG has retained Golder Associates (Sudbury) to assess location(s) for additional tailings storage basin within the TMF that will provide sufficient storage capacity for the LOM plan.

19.3

Permits Status and Posted Bonds

   

The reader is referred to Section 3.3

Page | 100


Holt-Holloway Property
Updated NI 43-101 Technical report

19.4

Social and Community

   

As part of the Closure Plan process First Nations and community outreach consultation informs the public of developing projects.

   

KLG has recently signed an agreement with First Nations who have treaty and aboriginal rights which they assert within the operations area of the mine.

   

The agreement provides a framework for strengthened collaboration in the development and operations of the mine and outlines tangible benefits for the First Nations, including skills training and employment, opportunities for business development and contracting, and a framework for issues resolution, regulatory permitting and KLG’s future financial contributions.

   
19.5

Closure Plan

   

As part of the Holloway Mine development phase, a Closure Plan was submitted to government agencies as required under the Mining Regulations. The mine received government approval of this Closure Plan in 1996. In 2005, an addendum to the Holloway Shaft #1 and #2 Closure Plan included additional closure costs for the Blacktop Project and was submitted to government agencies as required, under the Mining Regulations. In 2006, an addendum to the Holloway Shaft #1 and #2 Closure Plan cost update was submitted to government agencies as required under the Mining Regulations.

   

In addition, an addendum to the Holt Shaft #3 (former Holt McDermott) Closure Plan was also submitted for a cost update, to government agencies as required under the Mining Regulations.

   

KLG has submitted an amendment to the closure plan to the MNDM in 2016 to amalgamate Holt and Holloway properties under one closure plan. A reply from MNDM is expected in 2017.

Page | 101


Holt-Holloway Property
Updated NI 43-101 Technical report

20.0

CAPITAL AND OPERATING COSTS

   
20.1

Capital Costs

   
20.1.1

Basis of Estimate

   

Capital costs estimate for major items is based on historical costs at the Holt and Holloway mines, costs included in the 2013 Budget or budgetary quotations from suppliers in the industry.

   
20.1.2

Cost Estimate

   

Capital expenditures budgeted for the Holt Mine, are $26.8 M in 2017. The majority of these expenditures, $18.1 M (68% of Holt budgeted capital expenditures), will be incurred developing Zone 4 and Zone 6 (vertical and lateral). In addition to the deferred development, a further $3.9 M (15% of Holt budgeted capital expenditures) will be spent on purchasing fixed and mobile equipment. The remaining amount will be spent on infrastructure, mainly in Zone 4 and Zone 6.

   

Details on capital expenditures for the LOM are provided in Table 20-1.


  Year 2017 2018 2019 2020 2021 2022 2023 2024 2025 Total
  Holt Mine ($M)                    
   Development 18.0 18.4 19.4 20.4 17.4 17.4 17.4 14.3 - 142.9
   Equipment 3.9 3.1 3.2 3.4 3.4 3.4 3.4 2.8 - 26.5
   Infrastructure 4.9 5.0 5.3 5.6 2.7 2.7 2.7 2.2 - 30.9
   Subtotal 26.8 26.5 27.9 29.4 23.5 23.5 23.5 19.2 - 200.3
                       
  Tousignant Project ($M)                    
   Development - - - - - - - 3.2 6.4 9.6
   Equipment - - - - - - - 0.6 1.2 1.9
   Infrastructure - - - - - - - 0.5 1.0 1.5
   Subtotal - - - - - - - 4.3 8.6 12.9
                       
  Total by Category ($M)                    
   Development 18.0 18.4 19.4 20.4 17.4 17.4 17.4 17.4 6.4 152.5
   Equipment 3.9 3.1 3.2 3.4 3.4 3.4 3.4 3.4 1.2 28.4
   Infrastructure 4.9 5.0 5.3 5.6 2.7 2.7 2.7 2.7 1.0 32.4
                       
  Total ($M) 26.8 26.5 27.9 29.4 23.5 23.5 23.5 23.5 8.6 213.3

Table 20-1: LOM capital expenditures breakdown for the Holt Mine.

Page | 102


Holt-Holloway Property
Updated NI 43-101 Technical report

Holloway Mine

   

The Holloway mine was placed on temporary suspension at the end of 2016. As a result, no life of mine plan and associated costs estimates are presented.

   
20.2

Operating Costs

   
20.2.1

Basis for Estimate

   

Operating costs for units of work that will be carried out by KLG personnel were based on KLG budget figures for 2017.

   
20.2.2

Cost Estimate

   

Operating unit cash costs for the Holt Mine average $100/t, based on the 2017 Budget, or $122/t when including royalties. Details are provided in Table 20-2.


  Holt Mine 2017 Budget
    Unit Costs ($/t)
  Surface G&A + Operations + Services $22.96
  Operating Development (Direct) $15.39
  Production Geology $7.89
  UG Services & Supervision $39.84
  Equipment Operations $21.84
  Regional + KLN Allocations $8.50
  Indirects Allocated to Capital ($15.79)
  Total Operating Cost (w/o royalties) $100.63
  Royalties $21.64
  Total Operating Cost (w/ royalties) $122.27

Table 20-2: Holt Mine operating unit cost breakdown.

Holloway Mine

The Holloway mine was placed on temporary suspension at the end of 2016. As a result, no life of mine plan and associated costs estimates are presented

Page | 103


Holt-Holloway Property
Updated NI 43-101 Technical report

21.0

ECONOMIC ANALYSIS

   

KLG is a producing issuer and, following instructions contained in Form 43-101F1 Technical Report, may exclude information required under Item 22 (Economic Analysis) for technical reports on properties currently in production unless the technical report includes a material expansion of current production.

Page | 104


Holt-Holloway Property
Updated NI 43-101 Technical report

22.0

ADJACENT PROPERTIES

   

There are no adjacent properties that influence the mineral resources or the mineral reserves of the Holt or Holloway mines.

   

There are no adjacent properties that the Holt mine or the Holloway mine relies upon for the operation of the mine and mill complex.

Page | 105


Holt-Holloway Property
Updated NI 43-101 Technical report

23.0

OTHER RELEVANT DATA AND INFORMATION

   

There is no other relevant data or information on the Holt-Holloway property known to the QPs that, if undisclosed, would make this NI 43-101 technical report misleading or more understandable.

Page | 106


Holt-Holloway Property
Updated NI 43-101 Technical report

24.0

INTERPRETATION AND CONCLUSIONS

   
24.1

General

   

The general consensus from an exploration perspective is that many of the mineral deposits at the Holt- Holloway property remain open or poorly drill tested along strike and dip and therefore they offer excellent potential for both surface and underground exploration programs. One sign of a robust project or mine is its ability to replenish and grow its mineral resources and mineral reserves. This has been the case at Holt and Holloway since operations were re-started.

   

This technical report was compiled by KLG employees.

   
24.2

Opportunities

   

Opportunities at the Holt and Holloway mine are as follows:


 

Significant mineralized Extensions to Zone 4, Worvest, Tousignant and Cascade to the west at Holt, and extensions of the Lightning Deep, and Sediment zone to the east at Holloway;

     
 

Significant increase in mineralized extensions of zone 6, Zone 7, C97, C104 mineral zones. These sub-vertical tabular zones are structurally associated with the Ghostmount Fault zone;

     
 

Discovery of a repetition of any one of the mineralized zones being actively developed at the Holt-Holloway operation;

     
 

A new mineral discovery on the Holt-Holloway property ideally one situated proximal to the Holloway shaft;

     
 

Potential for en-echelon flat mineralized zones similar to Zone 4 either above the present Zone 4 location or at depth;

     
 

Reduction or re-negotiation of the underlying production royalties;

     
 

Increase in production rate by de-bottlenecking the ore flow system at Holt;

     
 

Reduction in capital or operating costs by improving the planning and mining processes via the Company Continuous Improvement Program;

Page | 107


Holt-Holloway Property
Updated NI 43-101 Technical report

 

A higher gold price and lower operating costs could lower the cut-off grade, enhance cash flow and likely increase mineral reserves replacement rate;

     
 

Higher development productivity than budgeted will create more flexibility in the production plan as ore may become available sooner than originally planned;

     
 

Increase of productivity in general could results in additional lower grade ore mining on an incremental basis; and,

     
 

On-going exploration near the mines could result the discovery of new ore zone(s) near the operations and be brought into production quickly with lower capital expenses than another zone located further away from the Company current infrastructure.


24.3

Risks

   

Risks that could be present at the operation are summarized as follows:


 

Future exploration programs are unable to keep pace with mining that in turn results in mineral resources and mineral reserves being depleted;

     
 

Mineral resources may not be converted up to mineral reserves due to a lack of economic support;

     
 

Drop in gold price to a level whereby it becomes uneconomic to continue mining and developing the mine complex;

     
 

Increased costs for skilled labour, power, fuel, reagents, trucking, etc. could lead to an increase the cut-off grade and decrease the level of mineral resources and mineral reserves;

     
 

Mechanical breakdown of critical equipment (hoist, conveyance, mill, etc.) or infrastructure that could decrease or halt the production throughput at the mine;

     
 

Cost pressure on materials required to sustain development and production could impact negatively the profitability of the operations; and,

     
 

Production throughput relies on completing development activities as per the mining plan schedule. If lower development productivity than budgeted are encountered, this will likely affect the production profile of the current mining plan.

Page | 108


Holt-Holloway Property
Updated NI 43-101 Technical report

25.0

RECOMMENDATIONS

   

A number of recommendations arising from the Technical Report are found below:


 

Advancement of the 1075 level to the west is required to facilitate definition drilling of the Zone 4 western extensions. Creation of underground drill platforms to test for the strike extension of V-93 and down-dip extension of Zone 6 mineralization.

     
 

Work to standardize mine grids (local mine grids Holt-Holloway vs. UTM grids);

     
 

Follow-up on SRK’s and Rhys’ report recommendations. The key recommendation being the exploration for repetitions of mineral deposits at Holloway;

     
 

It is recommended to continue to develop the Holt mine by continually explore and define any potential zone surrounding the operations. It is believed that the land package near the mines is hosting a number of superior exploration targets, namely at Cascade and Tousignant West.

     
 

The technical team on site should continue to optimize the LOM plan with a view to maximize profitability and minimize potential shortage of mill feed.

In 2017, the Company’s exploration efforts will continue to focus on identifying additional mineral resources near existing operations. KLG will also initiate “grass roots” exploration on high priority targets as identified by a recently completed VTEM heliborne MAG / EM survey, and based on compilations of targets currently in KLG’s extensive database.

The 2017 exploration program, at a cost of $4.3M, consists primarily of core drilling, on targets situated to the west of the mine. More than 17% of the 2017 budget is planned for drilling on the Holt and Holloway properties.

The 2017 exploration program plans to utilize two drills in the early part of the year, possibly expanding to three drills depending on productivity.

Page | 109


Holt-Holloway Property
Updated NI 43-101 Technical report

26.0 REFERENCES
   
Ayer, J.A., Amelin, Y., Kamo, S.L., Ketchum, J.W.F., Kwok, K. and Trowell, N. 2002: Evolution of the southern Abitibi greenstone belt based on U-Pb chronology: autochthonous volcanic construction followed by plutonism, regional deformation and sedimentation; Precambrian Research, v. 115, pp. 63-95.
   
Ayer, J.A., Thurston, P.C., Bateman, R., Dube, B., Gibson, H.L., Hamilton, M.A., Hathway, B., Hocker, S.M., Houle, M.G., Hudak, G., Ispolatov, V.O., Lafrance, B., Lesher, C.M., MacDonald, P.J., Peloquin, A.S., Piercy, S.J., Reed, L.E. and Thompson, P.H., 2005: Overview of results from the Greenstone Architecture Project: Discover Abitibi Initiative: OGS, Open File 6154, 146 p.
   
Ayer, J.A., Trowell, N.F., Amelin, Y. and Corfu, F. 1999: Geological Compilation of the Abitibi Greenstone Belt in Ontario: Toward a revised Stratigraphy Based on Compilation and New Geochronology Results; in Summary of Field Work and Other Activities 1998: OGS MP169, pp. 14-24.
   
Barrick Gold Corporation, 2002: Information Document “Holt-McDermott Gold Processing Operation”.
   
Born, P. 1995: A sedimentary basin analysis of the Abitibi greenstone belt in the Timmins area, northern Ontario, Canada; Unpublished Ph. D. Thesis, Carlton University, Ottawa, 489 p.
   
Cater, D. and Salehi, K.; Holt-Holloway Property, Ontario, Canada. Updated NI 43-101 Technical Report addressed to SAS., March 27, 2015. 244 p.
   
CANMET (2004), Review of Geomechanical Stope Design at Holloway Mine, May 2004, Proj # 602713, Report MMSL 04-020(CR)
   
Cook, R.B., Valliant, W.W, and Pearson J.L. (2006): Technical Report on the Holloway- Holt Mining Project, Northeastern Ontario, Canada, NI 43-101 Technical Report prepared for St Andrew Goldfields Ltd., October 2, 2006, 170 p.
   
Corfu, F., Jackson, S.L., and Sutcliffe, R.H., 1991: U-Pb ages and tectonic significance of late alkalic nonmarine sedimentation: Timiskaming Group, southern Abitibi belt. Canadian Journal of Earth Sciences, vol. 28, pp. 489-503.
   
  Environment Canada, http://www.climate.weatheroffice.gc.ca
   
Golder Associates (1998): Review Visit to Holt McDermott Mine January 1998, ref 981- 1701

Page | 110


Holt-Holloway Property
Updated NI 43-101 Technical report

Golder Associates (1999): Review Visit to Holt McDermott Mine April 1999, ref 991-1708

Golder Associates (2008): Draft Closure Plan Holloway Complex St Andrew Goldfields LTD. January 2008.

Golder Associates (2008): Draft Report on Conceptual Deposition Plan Southwest and Southeast Basins Tailings Management Facility Holloway Mine, Ontario June 2008 ref 07-1118-0052.

Goldfarb, R.J., Groves, D.I., Gardoll, S. 2001: Orogenic gold and geologic time: a global synthesis: Ore Geology Reviews, vol 18, pp. 1-75.

Heather, K.B. 1998: New insights on the stratigraphy and structural geology of the southwestern Abitibi greenstone belt: Implications for the tectonic evolution and setting of mineral deposits in the Superior Province: in The first age of giant ore formation: stratigraphy, tectonics and mineralization in the Late Archean and Early Proterozoic; Papers presented at the PDAC, pp. 63-101.

Jensen, L.G., 1978: Stoughton and Marriott Townships, District of Cochrane. Ontario Geological Survey, report 173, 72 pages plus map.

Jensen, L.S., and Langford, F.F., 1985: Geology and Petrogenesis of the Archean Abitibi belt in the Kirkland Lake area, Ontario. Ontario Geological Survey, Miscellaneous

Lelièvre J., 2006: Metallurgical Tests on Holloway Ore, Unité de Recherche et de Service en Technologie Minérale (URSTM), January 16, 2006.

Newmont, 2006: Confidential Information Memorandum “Holloway-Holt Mining Camp,

Ontario, Canada”, March 2006.

Noranda Technology Centre (1997): Design Guidelines for the Holloway East Zone (Draft), August 1997 Paper 123, 130 p.

Poulsen, K.H., Robert, F., and Dube, B., 2000: Geological classification of Canadian gold deposits; geological Survey of Canada, Bulletin 540, 106 p.

Rhys, D.A., 2005a: Structural study of the Holloway and Holt-McDermott deposits, Ontario, with exploration implications; unpublished report for Newmont Canada Ltd., 79 pages plus appendices.

Rhys, D.A., 2005b: October 2005 Site Visit: observations and implications; unpublished Memo to Newmont Canada Ltd., 15 p.

Page | 111


Holt-Holloway Property
Updated NI 43-101 Technical report

Rhys, D.A., 2015: Holloway site visit, Oct. 30: geological comments on exploration targeting and target locations. Internal report prepared for St Andrew Goldfields. Dated Nov. 6, 2015.

Robert, F. Syenite Associated disseminated Gold Deposits in the Abitibi Greenstone Belt, Canada 2001.

Ropchan, J.R., Luinstra, B., Fowler, A.D., Benn, K., Ayer, J., Berger, B., Dahn, R. Labine, R. & Amelin, Y., 2002: Host rock and structural controls on the nature and timing of gold mineralization at the Holloway Mine, Abitibi Sub province, Ontario. Economic Geology, 97, pp. 291-309.

Satterly, J., 1949: Geology of Garrison Township. Ontario Department of Mines, Annual report, vol. LVIII, part IV, 31 pages and map.

Satterly, J., 1952: Geology of Harker Township. Ontario Department of Mines, Annual report, vol. LX, part VII, 47 pages and map.

Satterly, J., 1954: Geology of the north half of Holloway Township. Ontario Department of Mines, Annual report, vol. LXII, part VII, 38 pages and map.

SRK Consulting (Canada) Ltd. Regional Structural Geology Interpretation of Aeromagnetic Data, Timmins District, Northern Ontario. Report prepared for St. Andrew Goldfields. November 21, 2011.

St. Andrew Goldfields, 2013 Budget book submission – Internal document Dec, 2012.

W. V. Valliant, R.D. Bergen, SWRPA (2008) Technical Report on the Holloway-Holt Project, Ontario, Canada. NI 43-101 report, prepared for St Andrew Goldfields Ltd. July 2008. 263 pages.

Weather data for Timmins – web reference:

http://www.weather.com/outlook/travel/businesstraveler/wxclimatology/monthly/CAXX05 01.

Page | 112


Holt-Holloway Property
Updated NI 43-101 Technical report

27.0

SIGNATURE PAGE AND DATE

   

The undersigned prepared this technical report titled “Holt-Holloway Property, Ontario, Canada, Updated NI 43-101 Technical Report”. The effective date of this Technical report is December 31, 2016 and the disclosure date is March 30, 2017.

   

Signed,


“signed and sealed”    
     
Pierre Rocque, P. Eng. March 30, 2017 Kirkland Lake Gold Ltd.
    200 Bay Street, Suite 3120
    Toronto, Ontario, M5J 2J1
    Canada
     
     
     
“signed and sealed”    
     
Doug Cater, P. Geo. March 30, 2017 Kirkland Lake Gold Ltd.
    200 Bay Street, Suite 3120
    Toronto, Ontario, M5J 2J1
    Canada

Page | 113


Holt-Holloway Property
Updated NI 43-101 Technical report

CERTIFICATE OF QUALIFIED PERSON

I, Pierre Rocque, P. Eng., as an author of this report entitled “Holt-Holloway Property, Ontario, Canada, Updated NI 43-101 Technical Report” dated effective December 31, 2016 prepared for Kirkland Lake Gold Ltd. (the “Issuer”) do hereby certify that:

  1.

I am Vice President of Technical Services, at Kirkland Lake Gold Ltd., located at Royal Bank Plaza South Tower, 200 Bay Street, Suite 3120, Toronto, ON, Canada M5J 2J1.

     
  2.

This certificate applies to the technical report entitled “Holt-Holloway Property, Ontario, Canada, Updated NI 43-101 Technical Report”, dated effective December 31, 2016 (The “Technical Report”)

     
  3.

I graduated with a Bachelor’s degree in Mining Engineering (B. Ing.) in 1986 from École polytechnique de Montréal and a Master’s degree in Mining Engineering (M.Sc.Eng.) in 1992 from Queen’s University at Kingston. I have worked as a mining engineer since graduation from university in 1986. I have been directly involved in mine design of underground gold mines and, since 1997 I have overseen the mining engineering department at three narrow veins underground gold mines, providing relief to the Mine Manager and General Manager on site. Since 2008, I have provided corporate direction for the engineering function at junior gold exploration and producing companies, except from 2014 to 2016 where I was Global Director- Mining for an international EPCM firm. I am a member of Professional Engineers of Ontario and Ordre des ingénieurs du Québec.

     

4.

I am familiar with National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) and by reason of education, experience and professional registration I fulfill the requirements of a “qualified person” as defined in NI 43-101.

     
  5.

I last visited the Holt-Holloway Property, subject of the Technical Report, on March 2017.

     
  6.

I am responsible for the preparation of the Summary and Sections 1 to 5, 12, 14 to 27 of the Technical Report.

     
  7.

I am not independent of the Issuer as described in section 1.5 of NI 43-101, as I am an employee of the Issuer. Independence is not required under Section 5.3 (3) of NI 43–101.

     
  8.

I have prior involvement with the property that is the subject of the Technical Report as I was working for the previous owner of the Property between 2010 and 2014.

     
  9.

I have read NI 43–101 and the parts of the Technical Report for which I am responsible have been prepared in compliance with NI 43-101.

     
  10.

At the effective date of the Technical Report, to the best of my knowledge, information and belief, the parts of the Technical Report for which I am responsible contain all scientific and technical information that is required to be disclosed to make the Technical Report not misleading.

Dated this 30th day of March, 2017.

“Signed and Sealed”                                                  

Pierre Rocque, P. Eng.
Vice President Technical Services

Page | 114


Holt-Holloway Property
Updated NI 43-101 Technical report

CERTIFICATE OF QUALIFIED PERSON

I, Douglas Cater, P. Geo, as an author of this report entitled “Holt Holloway Property, Ontario Canada, Updated NI 43-101” dated effective December 31, 2016 prepared for Kirkland Lake Gold Ltd. (the “Issuer”) do hereby certify that:

I am Vice President Exploration Canada, at Kirkland Lake Gold Ltd. located at Royal Bank Plaza, South Tower 200 Bay Street, Suite 3120 Toronto, Ontario, M5J 2J1 Canada.

This certificate applies to the technical report entitled “Holt-Holloway Property Updated NI-43-101”, dated effective December 31, 2016 (the “Technical Report”).

I graduated with a Bachelor of Science degree in Earth Sciences from University of Waterloo, Waterloo, ON, in 1981. I have worked as a geologist since graduation from university in 1981. During that time, I have been employed as exploration geologist, mine geologist, resource geologist and consulting geologist, at several mining companies. I am a member in full standing of the Association of Professional Geoscientists of Ontario with Registration No. 0161. I have practiced my profession for over thirty years. I have been an Exploration Manager / Chief Geologist at several gold mines and advanced stage exploration projects since 1991 and have been responsible for all geological functions including calculating and reporting Resources and Reserves. Since January 2016, I have been Vice President Exploration responsible for surface exploration activities on the company’s extensive land package.

I am familiar with National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) and by reason of education, experience and professional registration I fulfill the requirements of a “qualified person” as defined in NI 43-101.

I last visited the Holt Holloway Mines, subject of the Technical Report, in March 2017.

I am responsible for the Summary and Sections 6 to 11, 13 and 22 to 25 of the Technical Report.

I am not independent of the Issuer as described in section 1.5 of NI 43-101, as I am an employee of the Issuer.

I have prior involvement with the property that is the subject of the Technical Report. I have been frequently involved with the property having overseen exploration activities on the properties since 2012.

I have read NI 43-101 and the parts of the Technical Report for which I am responsible have been prepared in compliance with NI 43-101.

At the effective date of the Technical Report, to the best of my knowledge, information and belief, the parts of the Technical Report for which I am responsible contain all scientific and technical information that is required to be disclosed to make the Technical Report not misleading.

Dated this 30 day of March, 2017.

“Signed and Sealed”  
Douglas Cater P. Geo  
Vice President Exploration  

Page | 115


Holt-Holloway Property
Updated NI 43-101 Technical report

Appendix A: Claim list.

HARKER Township        
Claim # PCL # Pin# SR MR Size (ha) Group
529376   UPMC  N Y 12.77 Canamax 10-39
529377   UPMC  N Y 15.34 Canamax 10-39
529378   UPMC  N Y 20.06 Canamax 10-39
529379   UPMC  N Y 15.38 Canamax 10-39
529380   UPMC  N Y 12.94 Canamax 10-39
529381   UPMC  N Y 12.28 Canamax 10-39
586435   UPMC  N Y 29.07 Canamax 10-39
586436   UPMC  N Y 10.42 Canamax 10-39
586437   UPMC  N Y 6.06 Canamax 10-39
586455   UPMC  N Y 12.20 Canamax 10-39
586456   UPMC  N Y 18.46 Canamax 10-39
586457   UPMC  N Y 11.47 Canamax 10-39
586458   UPMC  N Y 12.60 Canamax 10-39
632511   UPMC  N Y 10.88 Canamax 10-08
632512   UPMC  N Y 15.28 Canamax 10-08
632513   UPMC  N Y 20.07 Canamax 10-08
641387   UPMC  N Y 11.20 West Block
641388   UPMC  N Y 6.95 West Block
641389   UPMC  N Y 8.40 West Block
641390   UPMC  N Y 6.79 West Block
641391   UPMC  N Y 19.09 West Block
641392   UPMC  N Y 19.64 West Block
641393   UPMC  N Y 19.26 West Block
641394   UPMC  N Y 19.48 West Block
641395   UPMC  N Y 18.21 West Block
641396   UPMC  N Y 18.17 West Block
641397   UPMC  N Y 18.37 West Block
641398   UPMC  N Y 17.42 West Block
641399   UPMC  N Y 19.43 West Block
641400   UPMC  N Y 22.87 West Block
641401   UPMC  N Y 21.97 West Block
641402   UPMC  N Y 21.84 West Block
641403   UPMC  N Y 19.87 West Block
641404   UPMC  N Y 19.53 West Block

Page | 116


Holt-Holloway Property
Updated NI 43-101 Technical report

641405   UPMC N Y 20.74 West Block
641406   UPMC N Y 16.55 West Block
641410   UPMC N Y 10.27 West Block
641411   UPMC N Y 6.20 West Block
641412   UPMC N Y 6.34 West Block
641413   UPMC N Y 15.68 West Block
641516   UPMC N Y 19.32 Canamax 10-39a
641517   UPMC N Y 16.18 Canamax 10-39a
641518   UPMC N Y 27.23 Canamax 10-39a
641524   UPMC N Y 12.11 Canamax 10-39a
650690   UPMC N Y 15.56 Canamax 10-39a
650691   UPMC N Y 18.41 Canamax 10-39a
650692   UPMC N Y 17.14 Canamax 10-39a
661901   UPMC N Y 9.68 Canamax 10-39b
661902   UPMC N Y 18.09 Canamax 10-39
661903   UPMC N Y 22.70 Canamax 10-39b
661904   UPMC N Y 10.67 Canamax 10-39b
667727   UPMC N Y 4.86 Canamax 10-39b
667728   UPMC N Y 9.07 Canamax 10-39b
802656   UPMC N Y 7.54 West Block
802657   UPMC N Y 7.80 West Block
802658   UPMC N Y 13.49 West Block
802659   UPMC N Y 9.31 West Block
802668   UPMC N Y 12.54 West Block
802669   UPMC N Y 11.40 West Block
802671   UPMC N Y 16.12 West Block
802672   UPMC N Y 13.18 West Block
802673   UPMC N Y 16.49 West Block
802674   UPMC N Y 4.46 West Block
1034617   UPMC N Y 7.23 Canamax 10-31
1132678   UPMC N Y 13.91 Canamax 10-08
1132679   UPMC N Y 20.14 Canamax 10-08
1132680   UPMC N Y 16.94 Canamax 10-08
1132681   UPMC N Y 16.45 Canamax 10-08
1132682   UPMC N Y 16.99 Canamax 10-08
1132683   UPMC N Y 15.53 Canamax 10-08
1132684   UPMC N Y 18.56 Canamax 10-08
1132685   UPMC N Y 14.91 Canamax 10-08

Page | 117


Holt-Holloway Property
Updated NI 43-101 Technical report

1137349   UPMC N Y 13.25 Canamax 10-08
1137369   UPMC N Y 17.94 Canamax 10-08
1137389   UPMC N Y 14.68 Canamax 10-08
1184131   UPMC N Y 69.36 West Block
1201109   UPMC N Y 20.26 Canamax 10-31
1201110   UPMC N Y 9.34 Canamax 10-31
1206020   UPMC N Y 40.42 NYE
1211775   UPMC N Y 130.20 NYE
1211776   UPMC N Y 225.05 NYE
1211777   UPMC N Y 86.18 NYE
1242261   UPMC N Y 263.11 NYE
3013893   UPMC N Y 84.77 Canamax 10-31
3016950   UPMC N Y 90.62 Canamax 10-31
3016967   UPMC N Y 9.33 Canamax 10-31
4203533   UPMC N Y 26.34 Canamax 10-31
CLM313 1535LC 65376-099 Y Y 189.13 BG-Newmex
CLM323 1569LC 65376-106 Y Y 149.37 Holt Mine
CLM373 1635LC 65376-120 Y Y 140.15 BG-Canamax
CLM374 1730LC 65376-101 Y Y 79.74 BG-Lenora
CLM390 1730LC 65376-101 Y Y 154.72 BG-Manville
L10084 4261SEC 65376-161 N Y 17.43 Holloway Mine
L10085 4261SEC 65376-161 N Y 16.03 Holloway Mine
L10478 4261SEC 65376-161 N Y 15.52 Holloway Mine
L10696 4261SEC 65376-161 N Y 15.26 Holloway Mine
L10735 4261SEC 65376-161 N Y 16.32 Holloway Mine
L11081 4045SEC 65376-158 Y Y 13.09 Teddy Bear
L11166 4046SEC 65376-159 Y Y 11.23 Teddy Bear
L11167 4047SEC 65376-160 Y Y 8.96 Teddy Bear
L11168 4261SEC 65376-161 N Y 7.52 Holloway Mine
L11244 4119SEC 65376-104 Y Y 6.63 Holt Mine
L11245 4120SEC 65376-092 Y Y 17.57 Holt Mine
L11246 4121SEC 65376-103 Y Y 15.93 Holt Mine
L11247 4103SEC 65376-093 Y Y 15.76 Holt Mine
L11248 4104SEC 65376-102 Y Y 21.37 Holt Mine
L11249 4105SEC 65376-105 Y Y 21.38 Holt Mine
L11570 4087SEC 65376-117 Y Y 20.64 Harker Patents
L11571 3970SEC 65376-119 Y Y 14.88 Harker Patents

Page | 118


Holt-Holloway Property
Updated NI 43-101 Technical report

L11671 4261SEC 65376-161 N Y 11.56 Holloway Mine
L11927 4075SEC 65376-118 Y Y 24.12 Harker Patents
L29745 8315SEC 65376-036 Y Y 17.07 Lightvale
L29746 8961SEC 65376-035 Y Y 18.35 Lightvale
L29747 8962SEC 65376-033 Y Y 24.69 Lightvale
L29748 8963SEC 65376-034 Y Y 23.92 Lightvale
L29749 8964SEC 65376-048 Y Y 20.69 Lightvale
L29750 8965SEC 65376-029 Y Y 18.85 Lightvale
L29751 8316SEC 65376-049 Y Y 19.99 Lightvale
L29752 8966SEC 65376-028 Y Y 14.35 Lightvale
L29753 8967SEC 65376-050 Y Y 9.95 Lightvale
L30150 8960SEC 65376-060 Y Y 16.59 Lightvale
L30151 8993SEC 65376-059 Y Y 12.24 Lightvale
L30152 8994SEC 65376-058 Y Y 13.46 Lightvale
L30153 8979SEC 65376-051 Y Y 20.45 Lightvale
L30154 8980SEC 65376-021 Y Y 23.09 Lightvale
L30155 8981SEC 65376-022 Y Y 26.30 Lightvale
L30278 8989SEC 65376-020 Y Y 17.19 Lightvale
L30279 8990SEC 65376-052 Y Y 15.23 Lightvale
L30280 8991SEC 65376-057 Y Y 15.42 Lightvale
L32635 8984SEC 65376-097 Y Y 10.43 Lightvale
L32636 8985SEC 65376-098 Y Y 19.68 Lightvale
L32637 8986SEC 65376-076 Y Y 16.77 Lightvale
L32638 8992SEC 65376-073 Y Y 17.31 Lightvale
L32639 8995SEC 65376-074 Y Y 25.36 Lightvale
L32640 8996SEC 65376-075 Y Y 13.94 Lightvale
L32641 8982SEC 65376-081 Y Y 17.67 Lightvale
L32642 8983SEC 65376-082 Y Y 15.20 Lightvale
L32643 8987SEC 65376-096 Y Y 13.38 Lightvale
L32726 8997SEC 65376-083 Y Y 11.94 Lightvale
L32727 8988SEC 65376-084 Y Y 8.84 Lightvale
L32728 8998SEC 65376-095 Y Y 9.57 Lightvale
L32729 8999SEC 65376-053 Y Y 17.32 Lightvale
L32730 9000SEC 65376-056 Y Y 20.55 Lightvale
L32731 9201SEC 65376-077 Y Y 25.87 Lightvale
L34845 8968SEC 65376-013 Y Y 19.03 Lightvale
L34846 8969SEC 65376-011 Y Y 24.16 Lightvale
L34847 8970SEC 65376-054 Y Y 21.34 Lightvale

Page | 119


Holt-Holloway Property
Updated NI 43-101 Technical report

L34848 8971SEC 65376-055 Y Y 27.09 Lightvale
L34849 8972SEC 65376-078 Y Y 38.92 Lightvale
L34850 8973SEC 65376-079 Y Y 14.10 Lightvale
L34851 8974SEC 65376-080 Y Y 11.78 Lightvale
L40536 11327SEC 65376-017 Y Y 17.43 Lightvale
L40537 11328SEC 65376-024 Y Y 20.43 Lightvale
L40538 11329SEC 65376-025 Y Y 13.73 Lightvale
L40539 11330SEC 65376-032 Y Y 12.69 Lightvale
L40540 11331SEC 65376-018 Y Y 20.09 Lightvale
L40541 11332SEC 65376-023 Y Y 15.59 Lightvale
L40542 11333SEC 65376-026 Y Y 15.98 Lightvale
L40543 11334SEC 65376-030 Y Y 10.68 Lightvale
L40544 11335SEC 65376-019 Y Y 17.63 Lightvale
L40545 11336SEC 65376-027 Y Y 17.15 Lightvale
L40546 11337SEC 65376-031 Y Y 13.63 Lightvale
L43925 11338SEC 65376-014 Y Y 6.78 Lightvale
L43926 11339SEC 65376-010 Y Y 14.75 Lightvale
L43927 11340SEC 65376-007 Y Y 20.77 Lightvale
L43928 11341SEC 65376-015 Y Y 15.03 Lightvale
L43929 11342SEC 65376-009 Y Y 13.67 Lightvale
L43930 11343SEC 65376-006 Y Y 20.70 Lightvale
L43931 11344SEC 65376-016 Y Y 17.99 Lightvale
L43932 11345SEC 65376-008 Y Y 17.26 Lightvale
L43933 11346SEC 65376-005 Y Y 16.12 Lightvale
L525486 1601LC 65376-151 Y Y 33.84 Canamax 10-08
L525487 1601LC 65376-151 Y Y 24.56 Canamax 10-08
L525488 1601LC 65376-151 Y Y 18.77 Canamax 10-08
L525489 1601LC 65376-151 Y Y 26.57 Canamax 10-08
L528967 1851LC 65376-154 N Y 18.52 Canamax 10-31
L528968 1851LC 65376-154 N Y 18.63 Canamax 10-31
L528969 1851LC 65376-154 N Y 19.66 Canamax 10-31
L528970 1851LC 65376-154 N Y 18.11 Canamax 10-31
L528971 1851LC 65376-154 N Y 16.49 Canamax 10-31
L528972 1851LC 65376-154 N Y 17.92 Canamax 10-31
L529369 1601LC 65376-151 Y Y 14.95 Canamax 10-39
L529370 1601LC 65376-151 Y Y 11.47 Canamax 10-39
L529371 1601LC 65376-151 Y Y 24.36 Canamax 10-39

Page | 120


Holt-Holloway Property
Updated NI 43-101 Technical report

L529372 1601LC 65376-151 Y Y 16.01 Canamax 10-39
L529373 1601LC 65376-151 Y Y 22.82 Canamax 10-39
L529375 1601LC 65376-151 Y Y 14.13 Canamax 10-39
L586459 1601LC 65376-151 Y Y 9.32 Canamax 10-39
L586460 1601LC 65376-151 Y Y 20.21 Canamax 10-39
L586465 1601LC 65376-151 Y Y 12.16 Canamax 10-39
L586466 1601LC 65376-151 Y Y 8.09 Canamax 10-39
L586467 1601LC 65376-151 Y Y 15.42 Canamax 10-39
L586468 1601LC 65376-151 Y Y 14.74 Canamax 10-39
L628520 1534LC 65376-111 Y Y 8.27 Barrick East
L628533 1534LC 65376-111 Y Y 10.87 Barrick East
L628534 1534LC 65376-111 Y Y 15.85 Barrick East
L633298 1534LC 65376-112 Y Y 8.20 Barrick East
L633299 1534LC 65376-112 Y Y 11.17 Barrick East
L633300 1534LC 65376-111 Y Y 5.02 Barrick East
L633301 1534LC 65376-111 Y Y 3.39 Barrick East
L633303 1534LC 65376-111 Y Y 4.04 Barrick East
L633305 1534LC 65376-111 Y Y 11.93 Barrick East
L633306 1534LC 65376-111 Y Y 5.63 Barrick East
L633308 1534LC 65376-111 Y Y 18.19 Barrick East
L633309 1534LC 65376-111 Y Y 15.39 Barrick East
L633310 1534LC 65376-111 Y Y 12.73 Barrick East
L633311 1534LC 65376-111 Y Y 8.09 Barrick East
L70976 205LC 65377-063 Y Y 21.33 Canamax 13-23
L70977 206LC 65377-062 Y Y 15.24 Canamax 13-23
L70978 207LC 65376-003 Y Y 13.65 Canamax 13-23
L70979 208LC 65376-004 Y Y 16.35 Canamax 13-23
L802663 1534LC 65376-111 Y Y 2.91 Barrick East
L802666 1534LC 65376-111 Y Y 6.19 Barrick East
L802667 1534LC 65376-111 Y Y 3.88 Barrick East
L9862 3917SEC 65376-043 Y Y 15.86 Holloway Mine

Page | 121


Holt-Holloway Property
Updated NI 43-101 Technical report

HOLLOWAY            
586632   UPMC N Y 13.01 Canamax 10-42
588014   UPMC N Y 15.05 FN-Holloway 3
588165   UPMC N Y 13.14 FN-Holloway 3
588169   UPMC N Y 14.34 FN-Holloway 3
588170   UPMC N Y 15.25 FN-Holloway 3
588171   UPMC N Y 15.83 FN-Holloway 3
588172   UPMC N Y 16.16 FN-Holloway 3
588175   UPMC N Y 14.21 FN-Holloway 3
588176   UPMC N Y 15.61 FN-Holloway 3
588177   UPMC N Y 17.27 FN-Holloway 3
588178   UPMC N Y 16.03 FN-Holloway 3
588179   UPMC N Y 16.75 FN-Holloway 3
588182   UPMC N Y 14.52 FN-Holloway 3
588183   UPMC N Y 15.48 FN-Holloway 3
588184   UPMC N Y 17.10 FN-Holloway 3
588185   UPMC N Y 15.85 FN-Holloway 3
588186   UPMC N Y 16.93 FN-Holloway 3
588187   UPMC N Y 14.41 FN-Holloway 3
588188   UPMC N Y 15.35 FN-Holloway 3
588189   UPMC N Y 16.79 FN-Holloway 3
588190   UPMC N Y 15.81 FN-Holloway 3
588191   UPMC N Y 16.93 FN-Holloway 3
588192   UPMC N Y 15.61 FN-Holloway 3
588193   UPMC N Y 16.73 FN-Holloway 3
588194   UPMC N Y 18.42 FN-Holloway 3
588195   UPMC N Y 17.80 FN-Holloway 3
588196   UPMC N Y 18.71 FN-Holloway 3
588197   UPMC N Y 16.08 FN-Holloway 3
588198   UPMC N Y 16.95 FN-Holloway 3
588388   UPMC N Y 10.90 FN-Holloway 2
588389   UPMC N Y 15.27 FN-Holloway 2
588468   UPMC N Y 16.21 FN-Holloway 2
588469   UPMC N Y 12.48 FN-Holloway 2
588470   UPMC N Y 14.60 FN-Holloway 2
588471   UPMC N Y 17.71 FN-Holloway 2
588476   UPMC N Y 15.88 FN-Holloway 2
588477   UPMC N Y 10.96 FN-Holloway 2

Page | 122


Holt-Holloway Property
Updated NI 43-101 Technical report

588540   UPMC N Y 11.12 FN-Polishing Pond
588558   UPMC N Y 16.39 FN-Holloway 3
588559   UPMC N Y 15.68 FN-Holloway 3
588560   UPMC N Y 14.05 FN-Holloway 3
588563   UPMC N Y 24.61 FN-Holloway 3
588564   UPMC N Y 16.63 FN-Holloway 3
588565   UPMC N Y 17.03 FN-Holloway 3
588566   UPMC N Y 16.14 FN-Holloway 3
588567   UPMC N Y 17.06 FN-Holloway 3
588568   UPMC N Y 17.81 FN-Holloway 3
588569   UPMC N Y 17.56 FN-Holloway 3
588570   UPMC N Y 25.47 FN-Holloway 3
588573   UPMC N Y 16.78 FN-Holloway 3
588574   UPMC N Y 15.49 FN-Holloway 3
588575   UPMC N Y 17.12 FN-Holloway 3
596245   UPMC N Y 14.37 Canamax 10-42
596246   UPMC N Y 15.28 Canamax 10-42
596251   UPMC N Y 12.95 Canamax 10-42
596252   UPMC N Y 9.90 Canamax 10-42
596253   UPMC N Y 9.31 Canamax 10-42
596254   UPMC N Y 8.26 Canamax 10-42
596255   UPMC N Y 16.22 Canamax 10-42
596256   UPMC N Y 8.90 Canamax 10-42
596257   UPMC N Y 8.77 Canamax 10-42
599010   UPMC N Y 16.46 FN-Holloway 3
599011   UPMC N Y 15.27 FN-Holloway 3
599012   UPMC N Y 16.02 FN-Holloway 3
599013   UPMC N Y 17.58 FN-Holloway 3
599014   UPMC N Y 25.48 FN-Holloway 3
599020   UPMC N Y 22.09 FN-Holloway 3
599021   UPMC N Y 15.96 FN-Holloway 3
599022   UPMC N Y 15.86 FN-Holloway 3
599023   UPMC N Y 15.09 FN-Holloway 3
599024   UPMC N Y 13.21 FN-Holloway 3
599025   UPMC N Y 20.41 FN-Holloway 3
632507   UPMC N Y 20.71 Canamax 10-42
632508   UPMC N Y 7.94 Canamax 10-42

Page | 123


Holt-Holloway Property
Updated NI 43-101 Technical report

632509   UPMC N Y 8.05 Canamax 10-42
632510   UPMC N Y 8.10 Canamax 10-42
632515   UPMC N Y 38.79 Canamax 10-42
632516   UPMC N Y 11.85 Canamax 10-42
632517   UPMC N Y 14.87 Canamax 10-42
632518   UPMC N Y 15.79 Canamax 10-42
632519   UPMC N Y 18.97 Canamax 10-42
632520   UPMC N Y 15.18 Canamax 10-42
632818   UPMC N Y 15.89 Canamax 10-42
632819   UPMC N Y 15.51 Canamax 10-42
632821   UPMC N Y 15.80 Canamax 10-42
632822   UPMC N Y 8.17 Canamax 10-42
632823   UPMC N Y 18.43 Canamax 10-42
632824   UPMC N Y 20.30 Canamax 10-42
632825   UPMC N Y 27.67 Canamax 10-42
667156   UPMC N Y 15.46 Canamax 10-47
667157   UPMC N Y 15.66 Canamax 10-47
667158   UPMC N Y 13.35 Canamax 10-47
678846   UPMC N Y 18.73 Canamax 10-47
678847   UPMC N Y 15.09 Canamax 10-47
678848   UPMC N Y 15.11 Canamax 10-47
678849   UPMC N Y 15.39 Canamax 10-47
678850   UPMC N Y 13.50 Canamax 10-47
1111610   UPMC N Y 17.70 Canamax 10-25
1116486   UPMC N Y 12.73 Canamax 10-25
1137350   UPMC N Y 11.61 Canamax 10-25
1137360   UPMC N Y 13.87 Canamax 10-25
1137370   UPMC N Y 14.62 Canamax 10-25
4207023   UPMC N Y 2.22 Holloway Wedge
CLM321 1570LC 65375-086 Y Y 344.46 FN-Holloway 3
CLM322 1578LC 65375-085 Y Y 363.41 Holt Mine
CLM323 1569LC 65376-106 Y Y 218.29 Holt Mine
CLM345 1626LC 65375-092 Y Y 75.74 Holt Mine
CLM346 1626LC 65375-092 Y Y 271.76 Holt Mine
CLM351 1634LC 65375-107 Y Y 153.42 PGC 2
L10080 17179SEC 65376-178 Y N 8.81 Holloway Mine
L10080 4261SEC 65376-161 Y Y 8.81 Holloway Mine

Page | 124


Holt-Holloway Property
Updated NI 43-101 Technical report

L10081 17182SEC 65376-181 Y N 14.45 Holloway Mine
L10081 4261SEC 65376-161 Y Y 14.45 Holloway Mine
L10082 17172SEC 65376-175 Y N 21.72 Holloway Mine
L10082 4261SEC 65376-161 N Y 21.72 Holloway Mine
L10083 17171SEC 65376-174 Y N 14.19 Holloway Mine
L10083 4261SEC 65376-161 Y Y 14.19 Holloway Mine
L10218 21000SEC 65375-090 Y N 23.54 Holt Mine
L10219 21001SEC 65375-089 Y N 19.03 Holt Mine
L10220 21002SEC 65375-087 Y N 16.25 Holt Mine
L10220A 21002SEC 65375-087 Y Y 13.95 Holt Mine
L10221 21003SEC 65375-080 Y N 16.48 Holt Mine
L10221A 21003SEC 65375-080 Y Y 14.57 Holt Mine
L10222 21004SEC 65375-079 Y N 22.43 Holt Mine
L10476 3972SEC 65375-008 Y Y 17.56 Holloway Mine
L10477 3971SEC 65375-009 Y Y 16.11 Holloway Mine
L10534 3991SEC 65375-082 Y Y 16.51 Holloway Mine
L10697 17180SEC 65376-179 Y N 16.42 Holloway Mine
L10697 4261SEC 65376-161 Y Y 16.42 Holloway Mine
L10698 3990SEC 65375-056 Y Y 15.22 Holloway Mine
L10699 3989SEC 65375-054 Y Y 9.47 Holloway Mine
L10904 4261SEC 65375-001 N Y 6.34 Holloway Mine
L11009 8168SEC 65375-071 Y Y 8.38 Holt Mine
L11010 8164SEC 65375-072 Y Y 5.71 Holt Mine
L11011 8167SEC 65375-074 Y Y 6.11 Holt Mine
L11012 8165SEC 65375-075 Y Y 8.28 Holt Mine
L11087 4069SEC 65375-067 Y Y 22.57 Holt Mine
L11160 3988SEC 65375-055 Y Y 12.35 Holloway Mine
L11169 4261SEC 65376-161 Y Y 11.03 Holloway Mine
L11170 4261SEC 65376-161 Y Y 12.92 Holloway Mine
L11171 4261SEC 65376-161 Y Y 16.34 Holloway Mine
L11312 4411SEC 65375-060 Y Y 9.12 Holt Mine
L11313 4412SEC 65375-073 Y Y 8.78 Holt Mine
L11314 4413SEC 65375-077 Y Y 15.82 Holt Mine
L11315 4421SEC 65375-076 Y Y 11.70 Holt Mine
L11316 4422SEC 65375-078 Y Y 13.85 Holt Mine
L11381 4106SEC 65375-070 Y Y 10.27 Holt Mine
L11382 4107SEC 65375-069 Y Y 8.38 Holt Mine

Page | 125


Holt-Holloway Property
Updated NI 43-101 Technical report

L11383 4108SEC 65375-068 Y Y 9.24 Holt Mine
L11417 4109SEC 65375-058 Y Y 16.51 Holt Mine
L11418 4110SEC 65375-057 Y Y 7.78 Holt Mine
L11535 4112SEC 65375-063 Y Y 10.64 Holt Mine
L11548 4111SEC 65375-062 Y Y 9.38 Holt Mine
L11614 4113SEC 65375-059 Y Y 9.04 Holt Mine
L1213841 12731LC 65375-120 Y Y 24.53 Holt Mine
L12314 8166SEC 65375-061 Y Y 7.75 Holt Mine
L13137 4194SEC 65375-066 Y Y 12.37 Holt Mine
L13997 21005SEC 65375-091 Y N 23.46 Holt Mine
L13998 21006SEC 65375-088 Y N 30.84 Holt Mine
L13999 21007SEC 65375-081 Y N 23.98 Holt Mine
L27220 17532SEC 65375-004 Y N 16.33 Holloway Mine
L27221 17529SEC 65375-002 Y N 10.94 Holloway Mine
L27222 17530SEC 65375-003 Y N 16.53 Holloway Mine
L27223 17531SEC 65375-005 Y N 17.50 Holloway Mine
L36699 8305SEC 65375-065 Y Y 8.21 Holt Mine
L43058 11395SEC 65375-036 Y Y 21.51 Canamax 10-46c
L43061 11396SEC 65375-035 Y Y 17.15 Canamax 10-46c
L43062 11397SEC 65375-034 Y Y 19.39 Canamax 10-46c
L43067 11399SEC 65375-032 Y Y 24.48 Canamax 10-46c
L43068 11398SEC 65375-033 Y Y 21.21 Canamax 10-46c
L43072 11400SEC 65375-030 Y Y 19.84 Canamax 10-46c
L43073 11501SEC 65375-029 Y Y 15.15 Canamax 10-46c
L43076 11383SEC 65375-031 Y Y 21.17 Canamax 10-46c
L43077 11502SEC 65375-026 Y Y 23.48 Canamax 10-46c
L43078 11503SEC 65375-027 Y Y 24.75 Canamax 10-46c
L43079 11504SEC 65375-028 Y Y 15.05 Canamax 10-46c
L43921 23703SEC 65375-011 Y Y 9.37 Holloway Mine
L43922 23703SEC 65375-011 Y Y 7.18 Holloway Mine
L43923 23703SEC 65375-011 Y Y 11.40 Holloway Mine
L579576 1520LC 65375-025 Y Y 14.46 Canamax 10-45
L579577 1508LC 65375-104 Y Y 15.68 Canamax 10-45
L579586 1508LC 65375-104 Y Y 15.48 Canamax 10-45
L579587 1508LC 65375-104 Y Y 19.35 Canamax 10-45
L579588 1508LC 65375-104 Y Y 15.53 Canamax 10-45
L579589 1508LC 65375-104 Y Y 16.63 Canamax 10-45

Page | 126


Holt-Holloway Property
Updated NI 43-101 Technical report

L579590 1508LC 65375-104 Y Y 16.87 Canamax 10-45
L579591 1508LC 65375-104 Y Y 16.95 Canamax 10-45
L579592 1508LC 65375-104 Y Y 12.56 Canamax 10-45
L579593 1508LC 65375-104 Y Y 12.28 Canamax 10-45
L579594 1508LC 65375-104 Y Y 17.77 Canamax 10-45
L579595 1508LC 65375-104 Y Y 29.57 Canamax 10-45
L579654 1519LC 65375-022 Y Y 3.05 Canamax 10-42
L579654 1519LC 65375-022 N Y 15.66 Canamax 10-42
L579655 1519LC 65375-022 N Y 14.02 Canamax 10-42
L579656 1519LC 65375-022 N Y 17.19 Canamax 10-42
L579657 1519LC 65375-022 N Y 22.96 Canamax 10-42
L579658 1519LC 65375-022 N Y 11.25 Canamax 10-42
L579659 1519LC 65375-022 N Y 11.43 Canamax 10-42
L579660 1519LC 65375-022 N Y 21.60 Canamax 10-42
L579661 1519LC 65375-022 N Y 14.05 Canamax 10-42
L579662 1519LC 65375-022 N Y 14.46 Canamax 10-42
L579663 1519LC 65375-022 Y Y 4.01 Canamax 10-42
L579663 1519LC 65375-022 N Y 17.67 Canamax 10-42
L579664 1519LC 65375-022 Y Y 1.51 Canamax 10-42
L579664 1519LC 65375-022 N Y 13.80 Canamax 10-42
L579665 1519LC 65375-022 N Y 13.55 Canamax 10-42
L579666 1519LC 65375-022 N Y 13.63 Canamax 10-42
L579667 1519LC 65375-022 N Y 23.14 Canamax 10-42
L579668 1519LC 65375-022 N Y 13.96 Canamax 10-42
L579669 1518LC 65375-084 Y Y 17.70 Holt Mine
L579670 1518LC 65375-084 Y Y 24.90 Holt Mine
L579671 1519LC 65375-022 N Y 15.02 Canamax 10-42
L579672 1519LC 65375-022 N Y 15.47 Canamax 10-42
L579673 1519LC 65375-022 N Y 14.47 Canamax 10-42
L588478 12731LC 65375-120 Y Y 24.97 Holt Mine
L588479 12731LC 65375-120 Y Y 28.59 Holt Mine
L588534 12731LC 65375-120 Y Y 16.04 Holt Mine
L588535 12731LC 65375-120 Y Y 12.20 Holt Mine
L588536 12731LC 65375-120 Y Y 20.88 Holt Mine
L588537 12731LC 65375-120 Y Y 18.26 Holt Mine
L588571 1574LC 65375-095 Y Y 2.34 FN-Holloway 3
L588572 1574LC 65375-095 Y Y 3.02 FN-Holloway 3

Page | 127


Holt-Holloway Property
Updated NI 43-101 Technical report

L596247 1547LC 65375-106 N Y 25.25 Holt Mine
L596248 1518LC 65375-084 Y Y 16.43 Holt Mine
L596249 1518LC 65375-084 Y Y 16.45 Holt Mine
L596250 1547LC 65375-106 N Y 21.89 Holt Mine
L596258     N Y 17.50 Holloway Mine
L596259     N Y 16.33 Holloway Mine
L596260     N Y 16.53 Holloway Mine
L596261     N Y 10.94 Holloway Mine
L599015 1574LC 65375-095 Y Y 14.55 FN-Holloway 3
L599016 1574LC 65375-095 Y Y 2.88 FN-Holloway 3
L599018 1574LC 65375-095 Y Y 7.52 FN-Holloway 3
L599019 1574LC 65375-095 Y Y 16.45 FN-Holloway 3
L616488 1505LC 65375-083 Y Y 24.02 Holt Mine
L616489 1505LC 65375-083 Y Y 8.66 Holt Mine
L628048 1520LC 65375-025 Y Y 22.88 Canamax 10-42
L628049 1508LC 65375-104 Y Y 29.38 Canamax 10-42
L628463 1543LC 65375-017 Y Y 16.17 Canamax 10-42
L632501 1543LC 65375-017 Y Y 10.17 Canamax 10-42
L632502 1543LC 65375-017 Y Y 12.66 Canamax 10-42
L632503 1543LC 65375-017 Y Y 19.59 Canamax 10-42
L632504 1543LC 65375-017 Y Y 21.68 Canamax 10-42
L632505 1543LC 65375-017 Y Y 18.62 Canamax 10-42
L632506 1543LC 65375-017 Y Y 31.69 Canamax 10-42
L632820 1544LC 65375-016 Y Y 15.92 Canamax 10-42
L632826 1543LC 65375-017 Y Y 17.74 Canamax 10-42
L632827 1543LC 65375-017 Y Y 11.76 Canamax 10-42
L632828 1543LC 65375-017 Y Y 5.35 Canamax 10-42
L632829 1543LC 65375-017 Y Y 12.45 Canamax 10-42
L633296 1534LC 65376-112 Y Y 2.67 Barrick East
L633297 1534LC 65376-112 Y Y 4.42 Barrick East
L7135 2795SEC 65375-098 Y Y 27.72 Holt Mine
L7219 2799SEC 65375-099 Y Y 18.06 Holt Mine
L7220 2796SEC 65375-097 Y Y 16.29 Holt Mine
L7221 2800SEC 65375-096 Y Y 19.91 Holt Mine
L7241 3201SEC 65375-101 Y Y 28.27 Holt Mine
L7242 3202SEC 65375-102 Y Y 22.25 Holt Mine
L7246 3203SEC 65375-103 Y Y 20.17 Holt Mine

Page | 128


Holt-Holloway Property
Updated NI 43-101 Technical report

L7248 3204SEC 65375-100 Y Y 19.50 Holt Mine
L799696 1540LC 65375-105 Y Y 17.45 FN-Holloway 3
L799697 1540LC 65375-105 Y Y 17.73 FN-Holloway 3
L801063 1505LC 65375-083 Y Y 8.81 Holt Mine
L801065 1505LC 65375-083 Y Y 4.92 Holt Mine
L802768 1505LC 65375-083 Y Y 3.49 Holt Mine
L8246 3752SEC 65375-010 Y Y 7.95 Holloway Mine
L8247 3752SEC 65375-010 Y Y 12.29 Holloway Mine
L9863 3918SEC 65375-006 Y Y 8.78 Holloway Mine
L9864 3919SEC 65375-007 Y Y 10.04 Holloway Mine

  UPMC=  Unpatented Mining Claim(staked claim)
  LC=  Lease Cochrane
  SEC=  South East Cochrane

Page | 129