ANNUAL INFORMATION FORM

For the Year Ended December 31, 2023

March 19, 2024



Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2023

United States dollars unless otherwise stated

INTRODUCTORY NOTES AND CAUTIONARY STATEMENTS

GENERAL

In this Annual Information Form (“AIF”), Orla Mining Ltd., together with its subsidiaries, as the context requires, is referred to as the “Company” and “Orla”. Unless otherwise stated, all information contained in this AIF is as at December 31, 2023, being the last day of the Company’s most recently completed financial year.

This AIF should be read in conjunction with the Company’s audited consolidated financial statements and management’s discussion and analysis for the financial year ended December 31, 2023, which are available under the Company’s profile on the System for Electronic Document Analysis and Retrieval + (“SEDAR+”) at www.sedarplus.ca and through the United States Securities and Exchange Commission’s (“SEC”) Electronic Data Gathering and Retrieval System (“EDGAR”) at www.sec.gov.

CURRENCY PRESENTATION AND EXCHANGE RATE INFORMATION

This AIF contains references to Canadian dollars (“C$”) and United States dollars (“$”, “US$”, or “US dollars”). All dollar amounts referenced, unless otherwise indicated, are expressed in United States dollars. Unless otherwise indicated, Canadian dollar amounts have been converted to United States dollars at the indicative exchange rate on December 31, 2023, as quoted by the Bank of Canada, of US$0.7561 = C$1.00.

GOLD PRICES

The high, low, average, and closing London PM fix gold (“gold” or “Au”) prices in United States dollars per troy ounce for each of the three years preceding the period ended December 31, 2023, as quoted by the London Bullion Market Association, were as follows:

    

Year Ended December 31

2023

    

2022

    

2021

High

$

2,078

$

2,039

$

1,943

Low

$

1,811

$

1,629

$

1,684

Average

$

1,941

$

1,800

$

1,799

Closing

$

2,078

$

1,814

$

1,806

SILVER PRICES

The high, low, average, and closing London fix silver (“silver” or “Ag”) prices in United States dollars per troy ounce for each of the three years preceding the period ended December 31, 2023, as quoted by the London Bullion Market Association, were as follows:

    

Year Ended December 31

2023

    

2022

    

2021

High

$

26.03

$

26.18

$

29.59

Low

$

20.09

$

17.77

$

21.53

Average

$

23.35

$

21.71

$

25.14

Closing

$

23.79

$

23.95

$

23.09

Page 3


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2023

United States dollars unless otherwise stated

CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS

This AIF contains “forward-looking statements” or “forward-looking information” within the meaning of applicable securities legislation (collectively, “forward-looking statements”). Forward-looking statements are included to provide information about management’s current expectations and plans that allows investors and others to get a better understanding of the Company’s operating environment, the business operations, and financial performance and condition.

Forward-looking statements include, but are not limited to, statements regarding: the estimation of Mineral Resources and Mineral Reserves (each as defined herein); statements regarding planned exploration, development and mining activities, and expenditures, including estimated rates of production, timing, all-in sustaining costs (“AISC”), cash costs, sustaining and operating costs, mine production plans, projected mining and process recovery rates, and proposed exploration plans and expected results and timing thereof; feasibility studies and economic results thereof, including future production, net present value, internal rate of return, costs, payback period, and expenses; mining dilution assumptions; timeline for receipt of any required agreements, approvals, or permits; closure costs and requirements; terms of and ability to reach a subsequent agreement with Fresnillo plc (“Fresnillo”) to access the sulphide Mineral Resource at the Camino Rojo Project (as defined below) and obtaining regulatory approvals related thereto; Orla’s ability to obtain required mine licences, mine permits, required agreements with third parties, and regulatory approvals required in connection with exploration plans and future mining and mineral processing operations, including necessary permitting required to implement expected future exploration plans; community and ejido relations; the expected price of gold and silver; the Company’s sustainability strategy and its short-term and long-term sustainability goals; the Transaction with Contact (as such terms are defined below), including the receipt of necessary court, securityholder, and regulatory approvals, and the timing thereof; the Company’s ability to report on Mineral Reserve and Mineral Resource estimates for the Cerro Quema Project (as defined below) in future periods; and the Company’s objectives and strategies. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, identified by words or phrases such as “expects”, “is expected”, “anticipates”, “believes”, “plans”, “projects”, “estimates”, “assumes”, “intends”, “strategy”, “goals”, “objectives”, “potential”, “possible”, or variations thereof or stating that certain actions, events, conditions or results “may”, “could”, “would”, “should”, “might”, or “will” be taken, occur or be achieved (or the negative of any of these terms and similar expressions) are not statements of fact and may be forward-looking statements.

Forward-looking statements are based upon a number of factors and assumptions that, if untrue, could cause actual results, performance, or achievements to be materially different from future results, performance, or achievements expressed or implied by such statements. Forward-looking statements are based upon a number of estimates and assumptions that, while considered reasonable by the Company at this time, are inherently subject to significant business, economic, and competitive uncertainties and contingencies that may cause the Company’s actual financial results, performance, or achievements to be materially different from those expressed or implied herein. Some of the material factors or assumptions used to develop forward-looking statements include, without limitation: the future price of gold and silver; anticipated costs and the Company’s ability to fund its programs; the Company’s ability to carry on exploration, development, and mining activities; tonnage of ore to be mined and processed; ore grades and recoveries; decommissioning and reclamation estimates; currency exchange rates remaining as estimated; prices for energy inputs, labour, materials, supplies and services remaining as estimated; the Company’s ability to secure and to meet obligations under property agreements, including the Layback Agreement (as defined below); that all conditions of the Revolving Facility (as defined below) will be met; the timing and results of drilling programs; Mineral Reserve and Mineral Resource estimates and the assumptions on which they are based; the discovery of Mineral Resources and Mineral Reserves on the Company’s mineral properties; the obtaining of a subsequent agreement with Fresnillo to access the sulphide Mineral Resource at the Camino Rojo Project and develop the entire Camino Rojo Project Mineral Resources estimate; that political and legal developments will be consistent with current expectations; the timely receipt of required approvals and permits, including those approvals and permits required for successful project permitting, construction, and operation of projects; the timing of cash flows; the costs of operating and exploration expenditures; the Company’s ability to operate in a safe, efficient, and effective manner; the Company’s ability to obtain financing as and when required and on reasonable terms; the impact of coronavirus (“COVID-19”) on the Company’s operations; completion of the Transaction with Contact, including receipt of required securityholder,

Page 4


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2023

United States dollars unless otherwise stated

regulatory, and court approvals; that the Company’s activities will be in accordance with the Company’s public statements and stated goals; and that there will be no material adverse change or disruptions affecting the Company or its properties.

Forward-looking statements are subject to a variety of known and unknown risks, uncertainties, and other factors that could cause actual events or results to differ from those expressed or implied. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Certain important factors that could cause actual results, performance, or achievements to differ materially from those in the forward-looking statements include, among others: uncertainty and variations in the estimation of Mineral Resources and Mineral Reserves; the Company’s dependence on the Camino Rojo Oxide Mine (as defined below); risks related to the Company’s indebtedness; risks related to exploration, development, and operation activities; foreign country and political risks, including risks relating to foreign operations; risks related to the Cerro Quema Project; delays in obtaining or failure to obtain governmental permits, or non-compliance with permits; environmental and other regulatory requirements; delays in or failures to enter into a subsequent agreement with Fresnillo with respect to accessing certain additional portions of the Mineral Resource at the Camino Rojo Project and to obtain the necessary regulatory approvals related thereto; the Mineral Resource estimations for the Camino Rojo Project being only estimates and relying on certain assumptions; loss of, delays in, or failure to get access from surface rights owners; uncertainties related to title to mineral properties; water rights; risks related to natural disasters, terrorist acts, health crises, and other disruptions and dislocations, including the COVID-19 pandemic; financing risks and access to additional capital; risks related to guidance estimates and uncertainties inherent in the preparation of feasibility studies; uncertainty in estimates of production, capital, and operating costs and potential production and cost overruns; the fluctuating price of gold and silver; unknown labilities in connection with acquisitions; global financial conditions; uninsured risks; climate change risks; competition from other companies and individuals; conflicts of interest; risks related to compliance with anti-corruption laws; volatility in the market price of the Company’s securities; assessments by taxation authorities in multiple jurisdictions; foreign currency fluctuations; the Company’s limited operating history; litigation risks; the Company’s ability to identify, complete, and successfully integrate acquisitions; intervention by non-governmental organizations; outside contractor risks; risks related to historical data; the Company not having paid a dividend; risks related to the Company’s foreign subsidiaries; risks related to the Company’s accounting policies and internal controls; the Company’s ability to satisfy the requirements of SOX (as defined below); enforcement of civil liabilities; the Company’s status as a PFIC (as defined below) for U.S. federal income tax purposes; information and cyber security; the Company’s significant shareholders; gold industry concentration; shareholder activism; the failure to obtain securityholder, regulatory, or court approvals in connection with the Transaction with Contact; and other risks associated with executing the Company’s objectives and strategies.

This list is not exhaustive of the factors that may affect any of the Company’s forward-looking statements. Although the Company believes its expectations are based upon reasonable assumptions and have attempted to identify important factors that could cause actual actions, events, or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events, or results not to be as anticipated, estimated, or intended. See the section entitled “Risk Factors” below for additional risk factors that could cause results to differ materially from forward-looking statements.

Investors are cautioned not to put undue reliance on forward-looking statements. The forward-looking statements contained herein are made as of the date of this AIF and, accordingly, are subject to change after such date. The Company does not intend, and does not assume any obligation, to update this forward-looking information, except as required by law. Investors are urged to read the Company’s filings with Canadian securities regulatory agencies, which can be viewed online under the Company’s profile on SEDAR+ at www.sedarplus.ca and the Company’s documents filed with, or furnished to, the SEC, which are available on EDGAR at www.sec.gov.

Page 5


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2023

United States dollars unless otherwise stated

As set forth under “Risk Factors” herein, investors are cautioned that all of the mineralization comprising the Company’s Mineral Resource estimate with respect to the Camino Rojo Project is contained on mineral titles controlled by the Company. However, the Mineral Resource estimate assumes that the north wall of the conceptual floating pit cone used to demonstrate reasonable prospects for eventual economic extraction extends onto lands where mineral title is held by Fresnillo and that waste would be mined on Fresnillo’s mineral titles. On December 21, 2020, Orla announced that it had entered into the Layback Agreement. The Layback Agreement allows Orla to expand the Camino Rojo Project oxide pit onto part of Fresnillo’s mineral concession located immediately north of Orla’s property. This expansion will increase oxide and transitional ore available for extraction on Orla’s property below the pit outlined in Orla’s previous 2019 Feasibility Study as set forth in the technical report titled “Feasibility Study, NI 43-101 Technical Report on the Camino Rojo Gold Project, Municipality of Mazapil, Zacatecas, Mexico” dated June 25, 2019 (the “2019 Camino Rojo Report”). The Layback Agreement is only with respect to the portion of the heap leach material included in the current Mineral Reserve. As such, any potential development of the Camino Rojo Project that includes an open pit encompassing the entire Mineral Resource estimate would be dependent on an additional agreement with Fresnillo (or any potential subsequent owner of the mineral titles). It is estimated that approximately two-thirds of the mill Mineral Resource estimate and one-quarter of the leach Mineral Resource estimate comprising the Mineral Resource estimate are dependent on this additional agreement being entered into with Fresnillo. The leach Mineral Resource dependent on the additional agreement is mainly comprised of less oxidized transitional material with the lowest predicted heap-leach recoveries. Delays in, or failure to obtain, an additional agreement with Fresnillo would affect the development of a significant portion of the Mineral Resources of the Camino Rojo Project that are not included in the 2021 Camino Rojo Report (as defined below) mine plan, in particular by limiting access to significant mineralized material at depth. There can be no assurance that the Company will be able to negotiate such additional agreement on terms that are satisfactory to the Company and Fresnillo or that there will not be delays in obtaining the necessary additional agreement. Should such a subsequent agreement with Fresnillo not be obtained on favourable terms, the economics of any potential mine development using the full Mineral Resource estimate would be significantly negatively impacted.

SCIENTIFIC AND TECHNICAL INFORMATION

Unless otherwise indicated, scientific and technical information in this AIF relating to the Company’s mineral properties has been reviewed and approved by J. Andrew Cormier, P.Eng., Chief Operating Officer of the Company, and Sylvain Guerard, P. Geo., Senior Vice President, Exploration of the Company. Mr. Cormier and Mr. Guerard are each a “Qualified Person” as defined under National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”).

The disclosure included in this AIF uses Mineral Reserves and Mineral Resources classification terms that comply with reporting standards in Canada and the Mineral Reserves and Mineral Resources estimations are made in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum (“CIM”) Definition Standards on Mineral Reserves and Mineral Resources adopted by the CIM Council on May 10, 2014 (the “CIM Standards”) and NI 43-101. NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. The following definitions are reproduced from the CIM Standards:

A “Mineral Resource” is a concentration or occurrence of solid material of economic interest in or on the Earth’s crust in such form, grade or quality and quantity that there are reasonable prospects for eventual economic extraction. The location, quantity, grade or quality, continuity and other geological characteristics of a Mineral Resource are known, estimated, or interpreted from specific geological evidence and knowledge, including sampling. Mineral Resources are sub-divided, in order of increasing geological confidence, into Inferred, Indicated and Measured categories.

An “Inferred Mineral Resource” is that part of a Mineral Resource for which quantity and grade or quality are estimated based on limited geological evidence and sampling. Geological evidence is sufficient to imply but not verify geological and grade or quality continuity. An Inferred Mineral Resource has a lower level of confidence than that applying to an Indicated Mineral Resource and must not be converted to a Mineral Reserve. It is reasonably expected that most of the Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration.

Page 6


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2023

United States dollars unless otherwise stated

An “Indicated Mineral Resource” is that part of a Mineral Resource for which quantity, grade or quality, densities, shape, and physical characteristics are estimated with sufficient confidence to allow the application of Modifying Factors in sufficient detail to support mine planning and evaluation of the economic viability of the deposit. Geological evidence is derived from adequately detailed and reliable exploration, sampling and testing and is sufficient to assume geological and grade or quality continuity between points of observation. An Indicated Mineral Resource has a lower level of confidence than that applying to a Measured Mineral Resource and may only be converted to a Probable Mineral Reserve.

A “Measured Mineral Resource” is that part of a Mineral Resource for which quantity, grade or quality, densities, shape, and physical characteristics are estimated with confidence sufficient to allow the application of Modifying Factors to support detailed mine planning and final evaluation of the economic viability of the deposit. Geological evidence is derived from detailed and reliable exploration, sampling and testing and is sufficient to confirm geological and grade or quality continuity between points of observation. A Measured Mineral Resource has a higher level of confidence than that applying to either an Indicated Mineral Resource or an Inferred Mineral Resource. It may be converted to a Proven Mineral Reserve or to a Probable Mineral Reserve.

A “Mineral Reserve” is the economically mineable part of a Measured and/or Indicated Mineral Resource. It includes diluting materials and allowances for losses, which may occur when the material is mined or extracted and is defined by studies at Pre-Feasibility or Feasibility level as appropriate that include application of Modifying Factors. Such studies demonstrate that, at the time of reporting, extraction could reasonably be justified. The reference point at which Mineral Reserves are defined, usually the point where the ore is delivered to the processing plant, must be stated. It is important that, in all situations where the reference point is different, such as for a saleable product, a clarifying statement is included to ensure that the reader is fully informed as to what is being reported. Mineral Reserves are sub-divided in order of increasing confidence into Probable Mineral Reserves and Proven Mineral Reserves. The public disclosure of a Mineral Reserve must be demonstrated by a Pre-Feasibility Study or Feasibility Study.

A “Probable Mineral Reserve” is the economically mineable part of an Indicated, and in some circumstances, a Measured Mineral Resource. The confidence in the Modifying Factors applying to a Probable Mineral Reserve is lower than that applying to a Proven Mineral Reserve. Probable Mineral Reserve estimates must be demonstrated to be economic, at the time of reporting, by at least a Pre-Feasibility Study.

A “Proven Mineral Reserve” is the economically mineable part of a Measured Mineral Resource. A Proven Mineral Reserve implies a high degree of confidence in the Modifying Factors. Proven Mineral Reserve estimates must be demonstrated to be economic, at the time of reporting, by at least a Pre-Feasibility Study.

“Modifying Factors” are considerations used to convert Mineral Resources to Mineral Reserves. These include, but are not restricted to, mining, processing, metallurgical, infrastructure, economic, marketing, legal, environmental, social, and governmental factors.

CAUTIONARY NOTE TO UNITED STATES INVESTORS CONCERNING ESTIMATES OF MEASURED, INDICATED, AND INFERRED MINERAL RESOURCES

This AIF has been prepared in accordance with Canadian standards for the reporting of Mineral Resource and Mineral Reserve estimates, which differ from the previous and current standards of the United States securities laws. In particular, and without limiting the generality of the foregoing, the terms “Mineral Reserve”, “Proven Mineral Reserve”, “Probable Mineral Reserve”, “Inferred Mineral Resources”, “Indicated Mineral Resources”, “Measured Mineral Resources”, and “Mineral Resources” used or referenced in this AIF are Canadian mineral disclosure terms as defined in accordance with NI 43-101 and the CIM Standards.

Page 7


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2023

United States dollars unless otherwise stated

For United States reporting purposes, the SEC has adopted amendments to its disclosure rules (the “SEC Modernization Rules”) to modernize the mining property disclosure requirements for issuers whose securities are registered with the SEC under the Securities Exchange Act of 1934, as amended. The SEC Modernization Rules more closely align the SEC’s disclosure requirements and policies for mining properties with current industry and global regulatory practices and standards, including NI 43-101, and replace the historical property disclosure requirements for mining registrants that were included in Industry Guide 7 under the Securities Act of 1933, as amended (the “US Securities Act”). As a foreign private issuer that is eligible to file reports with the SEC pursuant to the multi-jurisdictional disclosure system, the Company is not required to provide disclosure on its mineral properties under the SEC Modernization Rules and provides disclosure under NI 43-101 and the CIM Standards. Accordingly, Mineral Reserve and Mineral Resource information contained in this AIF may not be comparable to similar information disclosed by United States companies.

As a result of the adoption of the SEC Modernization Rules, the SEC now recognizes estimates of “Measured Mineral Resources”, “Indicated Mineral Resources”, and “Inferred Mineral Resources.” In addition, the SEC has amended its definitions of “Proven Mineral Reserves” and “Probable Mineral Reserves” to be “substantially similar” to the corresponding CIM Standards that are required under NI 43-101. While the above terms are “substantially similar” to CIM Standards, there are differences in the definitions under the SEC Modernization Rules and the CIM Standards. There is no assurance any Mineral Reserves or Mineral Resources that the Company may report as “Proven Mineral Reserves”, “Probable Mineral Reserves”, “Measured Mineral Resources”, “Indicated Mineral Resources”, and “Inferred Mineral Resources” under NI 43-101 would be the same had the Company prepared the reserve or resource estimates under the standards adopted under the SEC Modernization Rules or under the prior standards of Industry Guide 7. Accordingly, information contained in this AIF may not be comparable to similar information made public by U.S. companies subject to the reporting and disclosure requirements under the United States federal securities laws and the rules and regulations thereunder.

NON-GAAP MEASURES

This AIF includes certain performance measures (“non-GAAP measures”) which are not specified, defined, or determined under generally accepted accounting principles (in the Company’s case, International Financial Reporting Standards, or “IFRS”), namely AISC and cash costs per ounce. These are common performance measures in the gold mining industry, but because they do not have any mandated standardized definitions, they may not be comparable to similar measures presented by other issuers. Accordingly, the Company uses such measures to provide additional information and readers should not consider them in isolation or as a substitute for measures of performance prepared in accordance with generally accepted accounting principles.

Please see the information under the heading “Non-GAAP Measures” in the Company’s management’s discussion and analysis for the financial year ended December 31, 2023, which section is incorporated by reference in this AIF, for a description of the non-GAAP measures noted above. The Company’s management’s discussion and analysis may be found on SEDAR+ at www.sedarplus.ca and on EDGAR at www.sec.gov.

Page 8


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2023

United States dollars unless otherwise stated

DESCRIPTION OF THE BUSINESS

OVERVIEW

Orla is a Canadian company listed on the Toronto Stock Exchange (“TSX”) under the symbol “OLA” and on the NYSE American LLC (the “NYSE American”) under the symbol “ORLA”. Orla’s corporate strategy is to acquire, explore, develop, and operate mineral properties where its expertise can substantially increase stakeholder value. Orla has two material gold projects for the purposes of NI 43-101:

the Camino Rojo project (“Camino Rojo” or the “Camino Rojo Project”) located in Zacatecas, Mexico, which consists of the Camino Rojo oxide gold mine (the “Camino Rojo Oxide Mine”), which achieved commercial production effective April 1, 2022, and the Camino Rojo sulphides project (the “Camino Rojo Sulphides”), and
the South Railroad project (“South Railroad” or the “South Railroad Project”) located in Nevada, which consists of the Dark Star and Pinion deposits and is situated within a prospective land package along the Carlin trend.

For further details regarding the Camino Rojo Project and the South Railroad Project, including information regarding their associated NI 43-101 technical reports, see “Summary of Mineral Reserve and Mineral Resource Estimates” and “Mineral Projects”.

NAME, ADDRESS AND INCORPORATION

The Company was incorporated under the Business Corporations Act (Alberta) on May 31, 2007 as a Capital Pool Company (as defined by the TSX Venture Exchange). On June 3, 2010, the Company was continued into British Columbia under the Business Corporations Act (British Columbia) and on April 21, 2015, the Company was continued into Ontario under the Business Corporations Act (Ontario). On June 12, 2015, the Company changed its name from “Red Mile Minerals Corp.” to “Orla Mining Ltd.” On December 2, 2016, in order to facilitate the acquisition of Pershimco Resources Inc. (“Pershimco”), the Company was continued as a federal company under the Canada Business Corporations Act (the “CBCA”). Following the continuance, on December 6, 2016, the plan of arrangement under the CBCA involving Orla and Pershimco was affected. Pursuant to the plan of arrangement, among other things, Orla and Pershimco were amalgamated and continued as one company under the name “Orla Mining Ltd.”

The Company’s registered office and its head and principal office is located at Suite 1010 – 1075 West Georgia Street, Vancouver, British Columbia, Canada, V6E 3C9.

Page 9


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2023

United States dollars unless otherwise stated

INTERCORPORATE RELATIONSHIPS

The following is a diagram of the intercorporate relationships among Orla and its subsidiaries, including their respective jurisdictions of incorporation.

Graphic

Certain inactive subsidiaries with both less than 10% of the total assets of the Company and 10% of the total revenues of the Company are excluded from the diagram. The Company holds 100% of the shares of each subsidiary, provided that, as required under Mexican corporate law, Minera Camino Rojo SA de CV (“Minera Camino Rojo”) has two shareholders – Orla Mining Ltd. holds 98% of the shares and 2% are held by a Canadian subsidiary of the Company, which holds its shares in trust for the Company.

THREE YEAR HISTORY

Developments During 2021

On January 11, 2021, the Company announced the results of an updated Feasibility Study and Mineral Reserve estimate on the Camino Rojo Project. On February 9, 2021, the Company filed the associated technical report for the Feasibility Study titled “Unconstrained Feasibility Study NI 43-101 Technical Report on the Camino Rojo Gold Project Municipality of Mazapil, Zacatecas, Mexico” dated effective January 11, 2021 (the “2021 Camino Rojo Report”) on SEDAR+ at www.sedarplus.ca and EDGAR at www.sec.gov. The 2021 Camino Rojo Report superseded the 2019 Camino Rojo Report. See “Mineral Projects – Camino Rojo Project”.

Page 10


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2023

United States dollars unless otherwise stated

On February 26, 2021, the Company announced that it had closed the layback agreement (the “Layback Agreement”) with Fresnillo following receipt of approval from the Mexican Federal Competition Commission (Comisión Federal de Competencia Económica). The Layback Agreement, originally announced by the Company on December 21, 2020, allows the Company to expand the Camino Rojo Project Oxide Mine onto part of Fresnillo’s mineral concession located immediately north of the Company’s property. This provided the Company with access to oxide and transitional heap leachable Mineral Resources on the Company’s property below the open pit outlined in the 2019 Camino Rojo Report, subject to receipt of required permits. In addition, the Layback Agreement provides Orla with the right to mine from Fresnillo’s mineral concession, and recover for Orla’s account, all oxide and transitional material amenable to heap leaching that is within an expanded open pit. Pursuant to the terms of the Layback Agreement, the Company was required to pay total cash consideration of $62.8 million through a staged payment schedule, with remaining payments bearing interest at 5% per annum until the date of payment. The final payment under the Layback Agreement were made by the Company in November 2023.

On June 30, 2021, the Company announced a $35.0 million non-brokered prospectus financing consisting of 9,085,263 Common Shares priced at C$4.75 per Common Share for total gross proceeds of $35,000,000 (C$43,155,000). The financing was subscribed to by accredited investors, including Pierre Lassonde, Agnico Eagle Mines Limited (“Agnico Eagle”), Trinity Capital Partners Corporation, and a large institutional investor. The financing was completed on July 14, 2021.

On December 13, 2021, the Company completed the first gold pour at the Camino Rojo Oxide Mine.

Developments During 2022

On March 1, 2022, the Company appointed Chafika Eddine as Chief Sustainability Officer, a newly created position within the Company.

The Company declared commercial production at the Camino Rojo Oxide Mine effective April 1, 2022.

On April 28, 2022, the Company entered into a credit agreement (the “Original Credit Agreement”) in respect of a US$150 million secured credit facility, which consisted of a US$100 million term facility and a US$50 million revolving facility, through a syndicate of lenders composed of The Bank of Nova Scotia, Bank of Montreal, and Canadian Imperial Bank of Commerce.

On June 12, 2022, Orla entered into a definitive arrangement agreement with Gold Standard Ventures Corp. (“Gold Standard”) pursuant to which Orla agreed to acquire all of the issued and outstanding shares of Gold Standard by way of a court-approved plan of arrangement under the Business Corporations Act (British Columbia) (the “BCBCA”). Under the terms of the transaction, Gold Standard shareholders received, in exchange for each Gold Standard common share held, 0.1193 of a Common Share and C$0.0001 in cash. The transaction closed on August 12, 2022, resulting in total cash consideration paid of $28,700 and the issuance of 43,688,556 Common Shares to Gold Standard shareholders. Gold Standard’s key asset was the South Railroad Project, a feasibility-stage, open pit, heap leach project located on the Carlin trend in Nevada. As part of the transaction, Orla also acquired the Lewis Project, a strategically located, prospective land package on the Battle Mountain trend in Nevada. See “Mineral Projects – South Railroad Project” and “Mineral Projects – Other Projects – Lewis Project” below for additional information.

On June 23, 2022, the Company held its 2022 annual general meeting. At the meeting, Tamara Brown and Scott Langley were elected as directors of the Company, with Mr. Langley replacing Eric Colby as Newmont Corporation’s (“Newmont”) nominee under the investor rights agreement between Newmont and the Company. George Albino and Ritch Hall did not stand for re-election and, accordingly, their term in office as Directors of the Company expired at the close of the annual general meeting.

Page 11


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2023

United States dollars unless otherwise stated

Developments During 2023

On April 13, 2023, the Company filed a short form base shelf prospectus (the “2023 Base Shelf Prospectus”) with the securities regulatory authorities in each of the provinces and territories of Canada, which allows the Company to offer for sale and issue from time to time Common Shares, warrants to purchase Common Shares, subscription receipts, units and debt securities, or any combination thereof (collectively, the “Securities”) during the 25-month period that the 2023 Base Shelf Prospectus, including any amendments thereto, remains effective. The 2023 Base Shelf Prospectus was part of a registration statement on Form F-10 which the Company also filed with the SEC under the U.S. Securities Act relating to the Securities. The Company’s previous base shelf prospectus was set to expire in April of 2023. The renewed 2023 Base Shelf Prospectus is effective for a further 25-month period and also qualifies for distribution in the United States.

On June 21, 2023, the Company held its 2023 annual general meeting. At the meeting, Ms. Ana Sofía Ríos was elected as a director of the Company.

On August 21, 2023, the Company released its inaugural Sustainability Report, which highlighted the Company’s approach and performance on its environmental, social, and governance (“ESG”) initiatives. See “Description of the Business – Environmental, Social and Governance” below for additional information.

On August 28, 2023, the Company amended and restated the Original Credit Agreement (the “Amended Credit Agreement”) in respect of an amended credit facility through its existing syndicate of lenders comprised of The Bank of Nova Scotia, Bank of Montreal, and Canadian Imperial Bank of Commerce. The amended facility consists of a US$150 million revolving term facility (the “Revolving Facility”), with the ability to increase the facility to US$200 million, subject to receipt of additional binding commitments and satisfaction of certain conditions precedent. The Revolving Facility has a four-year term, with full payment due upon maturity. The applicable interest rate for the Revolving Facility is based on the term Secured Overnight Financing Rate (SOFR), plus an applicable margin ranging from 2.50% to 3.75% based on the Company’s leverage ratio at the end of each fiscal quarter. A standby fee is payable on the undrawn portion of the facility. As of the date of this AIF, the Company has $88.35 million drawn under the Revolving Facility.

The Company appointed Mr. Rob Krcmarov to its Board of Directors on November 20, 2023.

On December 15, 2023, the Panamanian Ministry of Commerce and Industry (“MICI”) rejected the Company’s requests for extension for the three mining concessions comprising the Company’s Cerro Quema gold project (the “Cerro Quema Project”), declared the concessions cancelled and declared the area comprising the concessions to be a reserve area. On December 26, 2023, Minera Cerro Quema, S.A. (“MCQSA”), the Company’s subsidiary that holds the Cerro Quema Project, filed requests for reconsideration of MICI’s decisions. On March 11, 2024, MICI rejected the requests for reconsideration. The Company, both for itself and MCQSA, intends to pursue its rights under the Canada-Panama Free Trade Agreement (the “FTA”). See “Mineral Properties – Other Properties – Cerro Quema Project” and “Risk Factors –The Cerro Quema Project” for additional information.

Developments During 2024

On February 25, 2024, Orla entered into a definitive arrangement agreement with Contact Gold Corp. (“Contact”) pursuant to which the Company has agreed to acquire all of the issued and outstanding common shares of Contact (the “Contact Shares”) pursuant to a court-approved plan of arrangement under the BCBCA. Under the terms of the proposed transaction (the “Transaction”), Contact shareholders will receive, in exchange for each Contact Share held, 0.0063 of a Common Share. Contact’s key asset is the 100%-owned Pony Creek property, a 4,500 hectare exploration land package, strategically located adjacent to the South Railroad Project in the Carlin trend in Nevada. The Transaction is subject to securityholder, stock exchange, and court approval, along with the satisfaction of certain other closing conditions customary in a transaction of this nature. The Transaction is expected to close in late April 2024.

Page 12


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2023

United States dollars unless otherwise stated

ENVIRONMENTAL, SOCIAL, AND GOVERNANCE (ESG)

OVERVIEW

Orla’s commitment to ESG practices is critical to adding value to its business by allowing Orla to attract and retain top talent, earn the trust of key stakeholders, effectively manage risk, and ensure Orla’s long-term competitiveness and sustainability.

Orla is committed to conducting business in a responsible manner at all times, which means respecting the health and safety of its employees, protecting the environment, respecting the human rights of employees and the residents in the communities in which the Company operates, and contributing to the sustainable development of those communities. Orla believes that it is its responsibility to transform Mineral Resources into a net positive benefit for its stakeholders.

Orla has been focused on strengthening its ESG approach through aligning Company practices to industry leading standards and adopting a more robust reporting and sustainability disclosure.

Orla has also conducted an ESG Materiality Assessment, which focused on identifying and prioritizing the ESG factors with the greatest potential to impact the value of the business. The ESG Materiality Assessment considered leading ESG frameworks and standards (including the Sustainability Accounting Standards Board and the recommendations of the Task Force on Climate-related Financial Disclosures) as well as relevant ESG regulations and initiatives. The ESG Materiality Assessment is reviewed and updated annually.

In 2023, Orla also released its inaugural Sustainability Report, highlighting the Company’s approach and performance on ESG initiatives. The Sustainability Report enhances Orla’s ESG disclosure and introduces a long-term roadmap through the Company’s “Towards 2030 Sustainability Strategy”. This strategy sets clear priorities, key performance indicators, action plans and timelines to drive progress in areas such as health and safety, climate change mitigation, water stewardship, biodiversity, community impact management, workforce diversity, equity, and inclusion. The Sustainability Report also outlined the Company’s key sustainability performance highlights for 2022, notably:

25% of Orla’s corporate goals were linked to ESG objectives, all of which were successfully met.
ESG performance evaluations were conducted for all executives and managerial-level employees.
A strong safety record was achieved, with a lost time injury frequency rate of 1.49 across various sites in 2022.
Significant community contributions being made at Camino Rojo, including local employment, local procurement, land leases, and local infrastructure investments.
The Company’s achievements in reducing air emissions and water use.

The full text of the Sustainability Report can be found on Orla’s website at www.orlamining.com/about-us/environmental-social-and-governance-esg.

The following sections provide an overview of certain aspects of Orla’s approach to ESG.

Page 13


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2023

United States dollars unless otherwise stated

ESH&S COMMITTEE AND POLICIES

The Board has established an Environmental, Sustainability, Health & Safety Committee which is responsible for all ESG matters particularly as they apply to environmental, sustainability, health, and safety concerns, assessing environmental and social risks and the Company’s risk management thereof. Orla has also adopted a number of policies in support of its sustainability goals, as further discussed below. The full text of these policies can be found on Orla’s website at www.orlamining.com/about-us/environmental-social-and-governance-esg.

Environmental, Sustainability, Health & Safety Policy.

The Company is committed to meeting or surpassing regulatory requirements in all of its exploration and development activities while working to protect the environment both within and beyond the Company’s operational boundaries. In keeping with this commitment, Orla has adopted an Environmental, Sustainability and Health & Safety Policy. The Company will conduct all of its operations in a manner that ensures full compliance with its Environmental, Sustainability and Health & Safety Policy, applicable legislation and government requirements. The aim of this policy is to protect the surroundings in which the Company operates, to minimize and manage environmental risk, and to enhance sustainable environmental practices. Orla will ensure that all of its activities are conducted in an environmentally safe and responsible manner and will ensure that its contractors adhere to the same high environmental standards.

Corporate Social Responsibility

The Company is committed to conducting its business in a responsible manner at all times. In keeping with this commitment, Orla has implemented a Corporate Social Responsibility Policy (the “CSR Policy”) which sets out the guidelines by which the Company will (i) endeavour to respect the health and safety of its employees, (ii) protect the environment, (iii) respect the human rights of its employees and the residents in the communities in which the Company operates and (iv) contribute to the sustainable development of those communities.

Human Rights Policy

The Company is committed to respecting the human rights of all individuals impacted by its operations, including local communities and Indigenous peoples and the Company’s employees, contractors, consultants, and other stakeholders. In support of this commitment, the Company has adopted a Human Rights Policy, which sets out the Company’s commitment to human rights and seeks to integrate human rights best practices into the Company’s management, business relationships, governance structures, and programs.

Indigenous Peoples Policy

Further to its Human Rights Policy, the Company also recognizes that it operates within the traditional territories and along-side the communities of a diversity of Indigenous peoples. The Company has therefor adopted an Indigenous Peoples Policy, which confirms the Company’s recognition of the importance of reconciliation between Indigenous peoples and broader society. The Indigenous Peoples Policy reiterates the Company’s commitment to building positive and sustainable relationships with Indigenous peoples, based on trust and respect, and focused on finding common goals through open dialogue. The Company also recognizes the importance of the United Nations Declaration on the Rights of Indigenous Peoples (UNDRIP) and the International Labour Organization Convention 169.

Page 14


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2023

United States dollars unless otherwise stated

ENVIRONMENT

Mining, exploration, development, and production activities are subject to various levels of federal, provincial, state, and local laws and regulations relating to the protection of the environment at all phases of operation. These regulations govern exploration, development, tenure, production, taxes, labour standards, occupational health, waste disposal, protection and remediation of the environment, reclamation, mine safety, toxic substances management, and other matters. These regulations mandate, among other things, the maintenance of air and water quality standards and land reclamation. They also set forth limitations on the general handling, transportation, storage, and disposal of solid and hazardous waste. Environmental legislation is evolving in a manner which will require stricter standards and enforcement, increased fines and penalties for non-compliance, more stringent environmental assessments of proposed projects and a heightened degree of responsibility for companies and their officers, directors, and employees. To the best knowledge of the Company, it is in compliance with all environmental laws and regulations in effect where its properties are located.

Environmental protection requirements did not have a material effect on the capital expenditures, earnings, or competitive position of Orla during the 2023 financial year and are not expected to have a material effect during the 2024 financial year. Orla is committed to ensuring that all its activities are conducted in an environmentally safe and responsible manner and will require that its contractors adhere to the same high environmental standards.

For 2023, there were no category 4 or 5 incidents across the Company operations and projects as defined by the U.S. Environmental Protection Agency and none of the Company’s sites were charged with fines or sanctions related to environmental incidents.

SOCIAL

OVERVIEW

The Company strives to actively engage and make positive contributions in the communities where it currently operates.

At the Camino Rojo Project, the Company has agreements in place with the ejidos of San Tiburcio, El Berrendo, La Pardita, and San Francisco de los Quijano, with commitments to deliver land leasing payments and certain social support such as scholarships, community infrastructure upgrades, social and economic development initiatives, impact investments, food and medicines to the most vulnerable community members. The Company also established a community response mechanism to receive, document, and resolve community requests, concerns, and complaints. As noted above, the Company has implemented the CSR Policy and has a full-time community relations team for the Camino Rojo Project. The Company has also contracted an independent consulting firm to evaluate the CSR program and advise on its continued development.

At the South Railroad Project, the focus in 2023 for social initiatives was oriented to providing donations to local non-profit organizations, schools, youth activities, and community events, including donations to local charities and local baseball, softball, football, and soccer youth sport programs. The Company has also initiated a plan to map local stakeholders and enhance engagement at the project, and local knowledge of the project by hosting a community meeting to provide introductions and a project overview to Elko County community leaders.

Page 15


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2023

United States dollars unless otherwise stated

HEALTH AND SAFETY

The Company is committed to the health and safety of its employees and strives to create and maintain a safe working environment by complying with all applicable health and safety laws, rules, and regulations. Orla acknowledges that there are safety risks associated with its business and, through proactive risk management, continuously aims to minimize and control these risks. The Company now has a Health and Safety department with full time personnel at Camino Rojo and South Railroad and continues to develop Health and Safety policies and procedures to comply with regulations and industry best practices. For 2023, the Company had a lost time injury frequency rate (LTIFR) of 1.71 across all sites. See “Environmental, Social, and Governance – ESH&S Committee and Policies” above for additional information on the Company’s commitment to health and safety.

EMPLOYEES

As at December 31, 2023, the Company had (327) employees, which includes employees located in Canada (25), Panama (8), Mexico (281) and Nevada (13). In addition, there were 286 contractors working on the Camino Rojo Project, two at the corporate offices in Canada, and no contractors on the South Railroad or the Cerro Quema Projects. No management functions of the Company are performed to any substantial degree by a person other than the Directors or executive officers of the Company.

The Company respects and supports the rights of its employees and contractors, including freedom of association and collective bargaining, and the Company promotes ongoing engagement and proactive dialogue with its workers’ unions. In total, approximately 54% of the workforce at Camino Rojo was unionized in 2023. In 2023, Minera Camino Rojo entered into a collective bargaining agreement with the union Sindicato Nacional de Trabajadores Mineros Metalúrgicos y Similares de la República Mexicana, Section #335.

GOVERNANCE

Orla recognizes the importance of corporate governance to the effective management of Orla and to the protection of its stakeholders. Orla’s approach to significant issues of corporate governance is designed with a view of ensuring that the business and affairs of Orla are effectively managed to enhance stakeholder value. Additional information on Orla’s corporate governance practices is contained in Orla’s Management Information Circular dated May 11, 2023, prepared for its most recent annual meeting of shareholders held on June 21, 2023 and filed on SEDAR+ at www.sedarplus.ca and on EDGAR at www.sec.gov. This information will also be contained in the Management Information Circular of the Company to be prepared in connection with the Company’s 2024 annual meeting of shareholders currently scheduled to be held in June 2024, which will be available on SEDAR+ at www.sedarplus.cawww.sedarplus.ca and on EDGAR at www.sec.gov. Orla’s current governance policies can be found on Orla’s website at www.orlamining.com/about-us/environmental-social-and-governance-esg/corporate-governance/.

FURTHER INFORMATION

SPECIALIZED SKILL AND KNOWLEDGE

All aspects of the Company’s business require specialized skills and knowledge. Such skills and knowledge include the areas of geology, mining, metallurgy, environmental, permitting, corporate social responsibility, finance, accounting, and legal. Orla faces competition for qualified personnel with these specialized skills and knowledge, which may increase costs of operations or result in delays.

Page 16


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2023

United States dollars unless otherwise stated

COMPETITIVE CONDITIONS

The mineral exploration and mining business is competitive. Competition is primarily for: (a) mineral properties that can be developed and operated economically; (b) technical experts that can find, develop, and mine such mineral properties; (c) labour to operate the mineral properties; and (d) capital to finance development and operations.

The Company competes with other mining companies, some of which have greater financial resources and technical facilities, for the acquisition and exploitation of mineral concessions, claims, leases, and other interests, to finance its activities and in the recruitment and retention of qualified employees. The ability of the Company to acquire, develop, and operate precious metal properties will depend not only on its ability to raise the necessary funding and operate its properties economically, but also on its ability to select and acquire suitable prospects for precious metal development and operation or metal exploration. See “Financing Risks” and “Competition” under “Risk Factors”.

BANKRUPTCY AND SIMILAR PROCEDURES

There have been no bankruptcy, receivership, or similar proceedings against the Company or any of its subsidiaries, or any voluntary bankruptcy, receivership, or similar proceedings by the Company or any of its subsidiaries, within the three most recently completed financial years or during or proposed for the current financial year.

FOREIGN OPERATIONS

The locations of the Company’s Camino Rojo Project in Mexico and South Railroad Project in Nevada expose the Company to certain risks, including currency fluctuations and possible political or economic instability that may result in the impairment or loss of mining titles or other mineral rights and opposition from environmental or other non-governmental organizations. Mineral exploration and mining activities in foreign jurisdictions may also be affected in varying degrees by political stability and governmental regulations relating to the mining industry; labour unrest; expropriation; renegotiation, or termination of existing concessions; ability of governments to unilaterally alter agreements; surface land access; illegal mining; changes in taxation policies or laws; and repatriation of funds. Any changes in regulations or shifts in political attitudes in such foreign countries are beyond the Company’s control and may adversely affect the Company’s business.

The Company also holds an interest in the Cerro Quema Project in Panama. In November 2023, Panama passed a legislative moratorium on mining activity and in December 2023, cancelled the Company’s renewal applications for the mining concessions comprising the Cerro Quema Project.

See “Risk Factors – Foreign Country and Political Risk”, “– Foreign Subsidiaries” and “– Cerro Quema Project”.

REORGANIZATIONS

There have been no material reorganizations of the Company or any of its subsidiaries within the three most recently completed financial years or during or proposed for the current financial year.

PRINCIPAL MARKETS AND DISTRIBUTION

The Company currently sells its refined gold and silver to customers located in the United States. The Company evaluates the counterparties to which it sells its product. The Company is not economically dependent on a limited number of customers for the sale of its gold and silver as its products can be sold through numerous world-wide commodity markets, traders, and financial institutions.

Page 17


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2023

United States dollars unless otherwise stated

SUMMARY OF MINERAL RESERVE AND MINERAL RESOURCE ESTIMATES

MINERAL RESERVES

The following tables summarize the Company’s Mineral Reserve estimates on its material mineral properties, the Camino Rojo Project and South Railroad Project, in both cases as at the dates set out in the footnotes.

    

    

    

Proven

    

Probable

    

Proven and Probable

Gold (Au)

000’s t

    

g/t

    

koz

000’s t

    

g/t

    

koz

000’s t

    

g/t

    

koz

Mexico

Camino Rojo

Oxide

14,488

0.78

362

35,917

0.71

821

50,404

0.73

1,183

 

 

Sulphide

 

 

 

 

 

 

 

 

Nevada

 

South Railroad

 

Oxide

 

8,960

 

1.15

 

333

 

56,239

 

0.70

 

1,271

 

65,199

 

0.77

 

1,604

 

 

Sulphide

 

 

 

 

 

 

 

 

Total Gold

 

23,448

 

0.92

 

694

 

92,156

0.71

 

2,092

 

115,604

 

0.75

 

2,787

    

    

    

Proven

    

Probable

    

Proven and Probable

SILVER (Ag)

000’s t

    

g/t

    

koz

000’s t

    

g/t

    

koz

000’s t

    

g/t

    

koz

Mexico

Camino Rojo

Oxide

14,488

15.4

7,195

35,917

15.3

17,624

50,404

15.3

24,819

 

 

Sulphide

 

 

 

 

 

 

 

 

Nevada

 

South Railroad

 

Oxide

 

2,049

 

6.6

 

437

 

33,992

 

5.2

 

5,700

 

36,040

 

5.3

 

6,137

 

 

Sulphide

 

 

 

 

 

 

 

 

Total Silver

 

16,536

 

14.4

 

7,632

 

69,908

10.4

 

23,324

 

86,445

 

11.1

 

30,956

Mineral Reserve Footnotes

All Mineral Reserves

1.The Mineral Reserve estimates have been prepared in accordance with the CIM Standards.
2.Rounding as required by reporting guidelines may result in summation differences.
3.The estimate of Mineral Reserves may be materially affected by geology, environment, permitting, legal, title, taxation, sociopolitical, marketing, or other relevant issues.
4.koz = 1,000 troy ounces; t = tonne (1,000 kilograms).

Camino Rojo, Mexico

1.Stephen Ling, P.Eng. Of Orla Mining is the qualified person responsible for the Mineral Reserve estimate for Camino Rojo.
2.The Mineral Reserve estimate for Camino Rojo has an effective date of December 31, 2023.
3.Mineral Reserves are based on prices of $1,500/oz gold and $20/oz silver.
4.Mineral Reserves are based on net smelter returns (“NSR”) cut-off of $7.34 per tonne.
5.NSR value for leach material is as follows:
Kp Oxide: NSR ($/t) = 32.80 x gold (g/t) + 0.055 x silver (g/t), based on gold recovery of 70% and silver recovery of 11%.
Ki Oxide: NSR ($/t) = 26.24 x gold (g/t) + 0.075 x silver (g/t), based on gold recovery of 56% and silver recovery of 15%.
Tran-Hi: NSR ($/t) = 28.12 x gold (g/t) + 0.136 x silver (g/t), based on gold recovery of 60% and silver recovery of 27%.
Tran-Lo: NSR ($/t) = 18.74 x gold (g/t) + 0.171 x silver (g/t), based on gold recovery of 40% and silver recovery of 34%.
6.The NSR values account for metal recoveries, refining costs, and refinery payable percentages.
7.Stockpiles are all derived from Camino Rojo mined material and are calculated using reconciled production figures adjusted for mining accuracy. Stockpile grades are calculated from grade control block grades. For the stockpile, no cutoff grade is used for reporting.
8.See “Mineral Properties – Camino Rojo Project – Mineral Reserves” for additional information.

South Railroad, Nevada

1.The Mineral Reserve estimate for South Railroad has an effective date of February 17, 2022.

Page 18


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2023

United States dollars unless otherwise stated

2.Consistent with the Company’s other reported Mineral Reserves, the Mineral Reserve estimate for the South Railroad Project in this AIF has been reported in metric units, which has been converted from Imperial system units currently in use at South Railroad and in the South Railroad Report (as defined below), using a conversion rate of 0.9071847 between short tonnes and metric tonnes and a conversion rate of 34.285718 between oz/short ton and g/metric tonne.
3.The qualified person responsible for the Mineral Reserves at South Railroad is Jordan M. Anderson of RESPEC Company LLC (“RESPEC”), formerly Mine Development Associates (“MDA”).
4.Mineral Reserves were defined based on pit designs that follow Whittle optimized pit shells created using $1,450 per oz Au and $18.76 per oz Ag. Pit designs followed pit slope recommendations provided by Golder and Associates.
5.Reserves are reported using break-even cut-off grades based on variable recoveries provided by Gary L. Simmons and processing and general and administrative costs:
Dark Star leach cut-off grade 0.17g/t.
Pinion oxide leach cut-off grade 0.17 g/t.
Pinion transition leach cut-off grade 0.24 g/t.
6.Silver is reported for Pinion reserves only.
7.The Mineral Reserves point of reference is the point where is material is placed onto the leach pad.
8.Energy prices of $0.66 per liter of off-road diesel were used to estimate mining costs.
9.See “Mineral Properties – South Railroad Project – Mineral Reserves” for additional information.

MINERAL RESOURCES

The following tables summarize the Company’s Mineral Resource estimates on its material mineral properties, the Camino Rojo Project and South Railroad Project, in both cases as at the dates set out in the footnotes.

Measured and Indicated Resources

    

    

    

Measured

    

Indicated

    

Measured and Indicated

Gold (Au)

000’s t

    

g/t

    

koz

000’s t

    

g/t

    

koz

000’s t

    

g/t

    

koz

Mexico

Camino Rojo

Oxide

17,715

0.79

449

60,916

0.71

1,396

78,631

0.73

1,846

 

 

Sulphide

 

3,358

 

0.69

 

74

 

255,445

 

0.88

 

7,221

 

258,803

 

0.88

7,296

Nevada

 

South Railroad

 

Oxide

 

9,561

 

1.12

 

343

 

65,450

 

0.67

 

1,410

 

75,011

 

0.73

 

1,753

 

 

Sulphide

 

 

 

 

311

 

3.10

 

31

 

311

 

3.10

31

Total Gold

 

30,633

 

0.88

 

866

 

382,122

0.82

 

10,059

 

412,755

 

0.82

 

10,925

    

    

    

Measured

    

Indicated

    

Measured and Indicated

Silver (Ag)

000’s t

    

g/t

    

koz

000’s t

    

g/t

    

koz

000’s t

    

g/t

    

koz

Mexico

Camino Rojo

Oxide

17,715

14.5

8,285

60,916

12.8

25,010

78,631

13.2

33,295

 

 

Sulphide

 

3,358

 

9.1

 

997

 

255,445

 

7.4

 

60,606

 

258,803

 

7.4

61,603

Nevada

 

South Railroad

 

Oxide

 

2,336

 

6.5

 

488

 

41,193

 

5.0

 

6,617

 

43,529

 

5.1

 

7,105

 

 

Sulphide

 

 

 

 

 

 

 

 

Total Silver

 

23,409

 

13.0

 

9,770

 

357,554

8.0

 

92,233

 

380,963

 

8.3

 

102,003

    

    

    

Measured

    

Indicated

    

Measured and Indicated

Lead (Pb)

000’s t

    

%

    

Mlb

000’s t

    

%

    

Mlb

000’s t

    

%

    

Mlb

Mexico

Camino Rojo

Oxide

 

 

Sulphide

 

3,358

 

0.13

%

9

 

255,445

 

0.07

%

404

 

258,803

 

0.07

%

414

Nevada

 

South Railroad

 

Oxide

 

 

 

 

 

 

 

 

 

 

 

Sulphide

 

 

 

 

 

 

 

 

Total Lead

 

3,358

 

0.13

%

9

 

255,445

0.07

%

404

 

258,803

 

0.07

%

414

    

    

    

Measured

    

Indicated

    

Measured and Indicated

Zinc (Zn)

000’s t

    

%

    

Mlb

000’s t

    

%

    

Mlb

000’s t

    

%

    

Mlb

Mexico

Camino Rojo

Oxide

 

 

Sulphide

 

3,358

 

0.38

%

28

 

255,445

 

0.26

%

1,469

 

258,803

 

0.26

%

1,497

Nevada

 

South Railroad

 

Oxide

 

 

 

 

 

 

 

 

 

 

 

Sulphide

 

 

 

 

 

 

 

 

Total Zinc

 

3,358

 

0.38

%

28

 

255,445

0.26

%

1,469

 

258,803

 

0.26

%

1,497

Page 19


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2023

United States dollars unless otherwise stated

Inferred Mineral Resources

    

    

    

Inferred

    

    

Inferred

Gold (Au)

000’s t

    

g/t

    

koz

Silver (Ag)

000’s t

    

g/t

    

koz

Mexico

Camino Rojo

Oxide

4,258

0.60

83

Mexico

Camino Rojo

Oxide

4,258

5.7

773

 

 

Sulphide

 

56,564

 

0.87

 

1,577

 

 

 

Sulphide

 

56,564

 

7.5

13,713

Nevada

 

South Railroad

 

Oxide

 

18,662

 

0.45

 

271

 

Nevada

 

South Railroad

 

Oxide

 

1,178

 

2.4

 

92

 

 

Sulphide

 

3,601

 

3.87

 

448

 

 

 

Sulphide

 

 

Total Gold

 

83,084

 

0.89

 

2,379

 

 

Total Silver

 

62,000

 

7.31

 

14,578

    

    

    

Inferred

    

    

Inferred

Lead (Pb)

000’s t

    

%

    

Mlb

Zinc (Zn)

000’s t

    

%

    

Mlb

Mexico

Camino Rojo

Oxide

Mexico

Camino Rojo

Oxide

 

 

Sulphide

 

56,564

 

0.05

%

63

 

 

 

Sulphide

 

56,564

 

0.23

%

290

Nevada

 

South Railroad

 

Oxide

 

 

 

 

Nevada

 

South Railroad

 

Oxide

 

 

 

 

Sulphide

 

 

 

 

 

 

Sulphide

 

 

Total Lead

 

56,564

 

0.05

%

63

 

 

Total Zinc

56,564

 

0.23

%

290

Mineral Resource Notes

All Mineral Resources

1.All figures are rounded to reflect the relative accuracy of the estimate and therefore numbers may not appear to add precisely. Columns may not sum exactly due to rounding.
2.Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. Mineral Resources are inclusive of Mineral Reserves. An Inferred Mineral Resource has a lower level of confidence than that applying to an Indicated Mineral Resource and must not be converted to a Mineral Reserve. It is reasonably expected that the majority of Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration.
3.The Mineral Resource estimates have been prepared in accordance with the CIM Standards.
4.koz = 1,000 troy ounces; mlb = million pounds (imperial); t = tonne (1,000 kilograms).

Camino Rojo, Mexico

1.The effective dates of the Mineral Resource estimates for Camino Rojo are: (i) December 31, 2023, for the oxides (leach material); and (ii) June 7, 2019 for the sulphides (mill material). The oxide Mineral Resource estimate has been updated from the 2022 Camino Rojo Report to account for depletion from mining operations at the Camino Rojo Oxide Mine and for current gold and silver price and costs.
2.Michael G. Hester, FAusIMM, of IMC, is the qualified person responsible for the Mineral Resource estimate for Camino Rojo.
3.Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.
4.Mineral Resources for leach (oxide) material are based on prices of $1,800/oz gold and $23/oz silver.
5.Mineral Resources for mill (sulphide) material are based on prices of $1,400/oz gold, $20/oz silver, $1.05/lb lead, and $1.20/lb zinc.
6.Mineral Resources are based on NSR cut-off grades of $7.20/t for leach material and $13.71/t for mill material.
7.NSR value for leach material is as follows:
Kp Oxide: NSR ($/t) = 39.38 x gold (g/t) + 0.066 x silver (g/t), based on gold recovery of 70% and silver recovery of 11%
Ki Oxide: NSR ($/t) = 31.50 x gold (g/t) + 0.089 x silver (g/t), based on gold recovery of 56% and silver recovery of 15%
Tran-Hi: NSR ($/t) = 33.75 x gold (g/t) + 0.161 x silver (g/t), based on gold recovery of 60% and silver recovery of 27%
Tran-Lo: NSR ($/t) = 22.50 x gold (g/t) + 0.202 x silver (g/t), based on gold recovery of 40% and silver recovery of 34%.
8.NSR value for mill material is 36.75 x gold (g/t) + 0.429 x silver (g/t) + 10.75 x lead (%) + 11.77 x zinc (%), based on recoveries of 86% gold, 76% silver, 60% lead, and 64% zinc.
9.The NSR values account for metal recoveries, refining costs, and refinery payable percentages.
10.Includes 2.5% NSR royalty and a US dollar:Mexican Peso exchange rate of 1:19.3.
11.Mineral Resources are reported in relation to a conceptual constraining pit shell in order to demonstrate reasonable prospects for eventual economic extraction, as required by the definition of Mineral Resource in NI 43-101; mineralization lying outside of the pit shell is excluded from the Mineral Resource.
12.The Mineral Resource estimate assumes that the conceptual constraining pit shell used to constrain the estimate extends onto land held by Fresnillo. Any potential development of the Camino Rojo Project that includes an open pit encompassing the entire Mineral Resource estimate (particularly Mineral Resources amenable to milling) would be dependent on obtaining an agreement with Fresnillo (in addition to the Layback Agreement, which is only with respect to a portion of the heap leach material included in the Mineral Reserve estimate).
13.The Mineral Resources are inclusive of those Mineral Resources that were converted to Mineral Reserves.

Page 20


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2023

United States dollars unless otherwise stated

14.The Mineral Resources reported are contained on mineral titles controlled by Orla and mineral titles in the existing Layback Agreement with Fresnillo.
15.Stockpiles are all derived from Camino Rojo mined material and are calculated using reconciled production figures adjusted for mining accuracy. Stockpile grades are calculated from grade control block grades and depleted by mining accuracy where appropriate. For the stockpile, no cutoff grade is used for reporting.
16.See “Mineral Properties – Camino Rojo Project – Mineral Resources” for additional information.

South Railroad, Nevada

1.The effective date of all Mineral Resources at the South Railroad Project is January 31, 2022.
2.Michael S. Lindholm, CPG, of RESPEC, is the qualified person responsible for the Mineral Resource estimate for the South Railroad Project.
3.Consistent with the Company’s other reported Mineral Resources, the Mineral Resource estimate for the South Railroad Project in this AIF has been reported in metric units, which have been converted from Imperial system units currently in use at South Railroad and in the South Railroad Report, using conversion factors of 0.90718474 between short tons and metric tonnes and 34.285714 between oz/short ton and g/metric tonne.
4.For all deposits, the cutoff for open pit oxide and transitional Mineral Resources is 0.171 g/t Au, and for sulfide Mineral Resources is 1.543 g/t Au. The cutoff for underground sulphide Mineral Resources is 3.429 g/t Au.
5.Resources are based on a US$1,750/oz gold price. The silver prices were adjusted to maintain a constant silver to gold ratio, which is $22.64/oz at the resource base case.
6.Metallurgical recoveries for optimization were applied as follows:
Dark Star – ROM recoveries vary based on formulas using model block gold grade, redox zone and silicification zone.
Pinion – ROM recoveries vary based on formulas using model block gold grade, redox zone, silicification zone and lithology.
Jasperoid Wash – ROM recoveries vary based on gold grade.
North Bullion – Oxide recovery is 70% from heap leach pad, Sulphide recovery is 85% from mill.
The Mineral Resource has been confined by “reasonable prospects of eventual economic extraction” open pits and underground shells.
7.Pit slope angles are:
Dark Star – Varies from 35 degrees to 47 degrees depending on lithology and face direction.
Pinion – Varies from 31 degrees to 52 degrees depending on lithology and face direction.
Jasperoid Wash and North Bullion – 45 degrees.
8.Bulk density measurements were obtained by the immersion method on drill core samples, and applied bedrock densities are:
Dark Star - 2.27 to 2.63
Pinion - 2.46 and 3.00
Jasperoid Wash - 2.40 to 2.55
North Bullion – 2.34 to 2.80, quantity of density data for Sweet Hollow, POD and South Lodes is minimal, so density data from other deposits in the same formations was used.
9.Due to a lack of silver outside Pinion, silver resources are reported for Pinion only rather than as consolidated resources to avoid reporting erroneous average silver grade.
10.See “Mineral Properties – South Railroad Project – Mineral Resources” for additional information.

MINERAL PROJECTS

The Company’s focus is on the acquisition, exploration, development and exploitation of mineral properties in which the Company’s exploration, development, and operating expertise could substantially enhance shareholder value. The Company’s two material projects are the Camino Rojo Project and the South Railroad Project. The Company also holds a 100% interest in the Cerro Quema Project and the Lewis project (the “Lewis Project”) located in Nevada. The Cerro Quema Project and the Lewis Project are not considered to be material projects for the Company for the purposes of NI 43-101. The Company previously held an interest in the Monitor Gold exploration project located in Nevada, however, the Company terminated its interest in this project in 2023.

THE CAMINO ROJO PROJECT

The following disclosure relating to the Camino Rojo Project has been derived, in part, from the 2021 Camino Rojo Report for the Camino Rojo Project, prepared by Carl E. Defilippi, RM, SME of Kappes, Cassiday and Associates (“KCA”), Matthew D. Gray, Ph.D., C.P.G. of Resource Geosciences Incorporated (“RGI”), Michael G. Hester, FAusIMM of IMC and John J. Ward, C.P.G. of John Ward, RG, Groundwater Consultant, LLC, each of whom is independent of the Company and a qualified person under NI 43-101. Reference

Page 21


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2023

United States dollars unless otherwise stated

should be made to the full text of the 2021 Camino Rojo Report, which is available under the Company’s profile on SEDAR+ at www.sedarplus.ca and on EDGAR at www.sec.gov, as the 2021 Camino Rojo Report contains additional assumptions, qualifications, references, reliances, and procedures that are not fully described herein.

Unless otherwise indicated, technical information disclosed herein since the release of the 2021 Camino Rojo Report has been updated under the supervision of, or reviewed, in the case of Mineral Resources, by Michael G. Hester, FAusIMM, at IMC, and in the case of mining and Mineral Reserves, by Stephen Ling, P.Eng., Director of Technical Services at Orla, each of whom is a “Qualified Person” under NI 43-101.

PROJECT DESCRIPTION, LOCATION, AND ACCESS

The Camino Rojo Project is a gold-silver-lead-zinc deposit located in the Municipality of Mazapil, State of Zacatecas, Mexico near the village of San Tiburcio. The project lies 190 km northeast of the city of Zacatecas, 48 km south-southwest of the town of Concepcion del Oro, Zacatecas, 260 km southwest of Monterrey, and 54 km south-southeast of Newmont’s Peñasquito Mine. The Camino Rojo Project area is centered at approximately 244150E 2675900N UTM NAD27 Zone 14N.

Access to the project site is by the paved four lane Mexican Highway 54 and Route 62, a secondary paved highway that passes through San Tiburcio. Access to the project is limited to one main gate to access process and camp areas, ensuring only authorized employees, contractors, and visitors are allowed onto the property or inside the critical facilities.

Both Monterrey and Zacatecas have airports with regularly scheduled flights south to Mexico City or north to the USA. There are numerous gravel roads within the property linking the surrounding countryside with the two highways, Highways 54 and 62, which transect the property. In addition, there is a railway approximately 40 km east of San Tiburcio. There are very few locations within the property that are not readily accessible by four-wheel drive vehicles.

The Camino Rojo property consisted of seven concessions held by Minera Camino Rojo, a subsidiary of Orla, covering in aggregate 138,636 ha, with one concession expiring in 2057 and the remaining six expiring in 2058. As part of the requirements to maintain the concessions in good standing, bi-annual fees must be paid based upon a per-hectare escalating fee, work expenditures must be incurred in amounts determined on the basis of concession size and age, and applicable environmental regulations must be respected.

Pursuant to the agreement whereby Orla acquired the Camino Rojo Project from Goldcorp (which was subsequently acquired and is wholly-owned by Newmont1 ) (the “Camino Agreement”), Newmont was granted a 2% NSR on all metal production from the Camino Rojo Project, except for metals produced under the sulphide joint venture option stipulated in the Camino Agreement. On October 29, 2020, this 2% NSR royalty that pertains to oxide material was acquired by Maverix Metals Inc. (which was subsequently acquired and is wholly-owned by Triple Flag Previous Metals Corp). A 0.5% royalty is also payable to the Mexican government as an Extraordinary Mining Duty, mandated by Federal law, and applies to precious metal production from all mining concessions, regardless of owner or other royalty encumbrances. A Special Mining Duty of 7.5% is also payable to the Mexican government on income derived from mineral production.

Orla is the operator of the Camino Rojo Project and has full rights to explore, evaluate, and exploit the property. Pursuant to the option agreement dated November 7, 2017 between Newmont and the Company, if a sulphide project is defined through a positive Pre-Feasibility Study outlining one of the development scenarios A or B below, Newmont may, at its option, enter into a joint venture for the purpose of future exploration, advancement, construction, and exploitation of the sulphide project.

Scenario A: A sulphide project where material from the Camino Rojo Project is processed using the existing infrastructure of the Peñasquito mine, mill and concentrator facilities. In such circumstances, the sulphide project would be operated by Newmont, who would earn a 70% interest in the sulphide project, with Orla owning 30%.

Page 22


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2023

United States dollars unless otherwise stated


1 Note: Where applicable, all references to Goldcorp in this AIF have been changed to Newmont.

Page 23


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2023

United States dollars unless otherwise stated

Scenario B: A standalone sulphide project with a mine plan containing at least 500 million tonnes of Proven and Probable Mineral Reserves using standalone facilities not associated with Peñasquito. Under this scenario, the sulphide project would be operated by Newmont, who would earn a 60% interest in the sulphide project, with Orla owning 40%.

Following exercise of its option, if Newmont elects to sell its portion of the sulphide project, in whole or in part, then Orla would retain a right of first refusal on the sale of the sulphide project.

On December 21, 2020, Orla announced that it had completed the Layback Agreement with Fresnillo, granting Orla the right to expand the Camino Rojo oxide pit onto 21.8 ha of Fresnillo’s 782 ha “Guachichil D1” mineral concessions, Title 245418, located immediately to the north of Orla’s property. The Layback Agreement is only with respect to the portion of the heap leach material included in the Mineral Reserve. As such, any potential development of the Camino Rojo Project that includes an open pit encompassing the entire Mineral Resource estimate would be dependent on an additional agreement with Fresnillo (or any potential subsequent owner of the mineral titles).

Surface rights in the project area are owned by several Ejidos, which are Federally defined agrarian communities and private landowners. The land overlying the Mineral Resource at the Camino Rojo Project, is controlled by Orla under an agreement with the San Tiburcio Ejido, comprised of approximately 360 voting members who collectively control 37,154 ha. Exploration work at the Camino Rojo Project has been carried out under the terms of surface access agreements negotiated with the San Tiburcio Ejido and two neighbouring Ejidos.

Camino Rojo SA de CV (then, a Goldcorp subsidiary) executed two agreements that are still current with the San Tiburcio Ejido that cover the Camino Rojo deposit. Camino Rojo SA de CV subsequently passed the rights and obligations of these agreements to Minera Peñasquito SA de CV (then, a Goldcorp subsidiary), who subsequently transferred the rights and obligations to Minera Camino Rojo. Another agreement to cover surface access for exploration was signed in 2018.

The two agreements currently in effect with Ejido San Tiburcio are:

(a)Previous to Expropriation Occupation Agreement (“COPE”) executed on February 26, 2013 by and between Camino Rojo SA de CV, in its position of “occupant”, and Ejido San Tiburcio, as the owner, with regards to a surface of 2,497.30 ha. In 2022, this surface area was expanded to 2,524.80 ha. The rights and obligations of this agreement were passed to Minera Camino Rojo and the agreement stipulates that the Ejido expressly and voluntarily accepts the expropriation of Ejido lands by Minera Camino Rojo, in effect converting the Ejido land to fee simple private land titled to Minera Camino Rojo. In the event that the Federal agency responsible for the expropriation process, the Secretario de Desarollo Agrario Territorial y Urbano, denies the petition to cede the Ejido lands to Minera Camino Rojo, the agreement automatically converts to a 30-year temporary occupation agreement. Payments are due on a monthly basis and Minera Camino Rojo has made all required payments. This agreement is valid and expires in 2043 and covers the area of the Mineral Resources and Mineral Reserves estimate disclosed in this AIF.
(b)Collaboration and Social Responsibility Agreement (“CSRA”), executed on February 26, 2013 by and between Camino Rojo SA de CV, in its position of “collaborator”, and Ejido San Tiburcio, as “beneficiary”, with regards to certain social contributions to be provided in favour of this last CSRA. The rights and obligations of this agreement were passed to Minera Camino Rojo and the agreement stipulates that Minera Camino Rojo will contribute 10,000,000 Pesos annually to the Ejido to be used to promote and execute diverse social and economic development programs to benefit the Ejido. Additionally, at its discretion, Minera Camino Rojo will provide support for adult education, career training, business development assistance, cultural programs, and scholastic scholarships. The agreement expires when exploration or exploitation activities at the Camino Rojo Project end. Minera Camino Rojo has made all required payments, thus this agreement is valid and remains in effect until mine closure or project cancellation.

Page 24


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2023

United States dollars unless otherwise stated

Minera Camino Rojo signed a Temporary Occupation Agreement (“COT”) with Ejido La Pardita on August 4, 2022 that covers 4,205 ha for a three-year period expiring on August 3, 2025. This COT requires annual payments of $3,574,250 Pesos. None of the Mineral Resources or Mineral Reserves disclosed in this AIF, nor proposed infrastructure, is located on Ejido La Pardita land. Minera Camino Rojo has made all required payments and the agreement is in good standing.

Minera Camino Rojo signed a COT with Ejido San Francisco Los Quijano on July 22, 2021 that covers 5,322 ha for a four-year period expiring on July 22, 2025. This COT requires annual payments of $4,532,200 Pesos. None of the Mineral Resources or Mineral Reserves disclosed in this AIF, nor proposed infrastructure, is located on Ejido San Francisco Los Quijano land. Minera Camino Rojo has made all required payments and the agreement is in good standing.

Fresnillo controls surface rights needed for exploration and mining on the Guachichil D1 mineral concession. Pursuant to the Layback Agreement, 27.5 ha of surface rights controlled by Fresnillo has been acquired by Minera Camino Rojo to mine on a portion of the Guachichil D1 mineral concession that covers the area outside of the Orla concession required for the Camino Rojo Oxide Mine.

No environmental liabilities are apparent on the Camino Rojo Project property. Prior to Orla’s development of the Camino Rojo Project, the property did not contain active or historic mines or prospects, and there were no pre-existing plant facilities nor tailings piles present within the project area. All exploration work has been carried out by Minera Camino Rojo and prior operators in accordance with Mexican environmental standards and regulations. Conditional upon continued compliance, permits for normal exploration activities are expected to be readily attainable.

Exploration and mining activities in Mexico are subject to control by the federal agency of the Secretaria del Medio Ambiente y Recursos Naturales (Secretary of the Environment and Natural Resources), known by its acronym “SEMARNAT”, which has authority over the two principal Federal permits:

a Manifesto de Impacto Ambiental (Environmental Impact Statement), known by its acronym as an “MIA” accompanied by an Estudio de Riesgo (Risk Study); and
Cambio de Uso de Suelo (Change of Land Use) permit, known by its acronym as a “CUS”, supported by an Estudio Tecnico Justificativo (Technical Justification Study).

The Company submitted MIA and CUS permit applications to SEMARNAT on August 29, 2019 and August 30, 2019, respectively, for the construction and operation of an open pit mine as per the project described in the 2019 Camino Rojo Report. Federal environmental authorities approved the CUS permit in December 2019, Minera Camino Rojo made the requisite payment to the National Forestry Commission on January 23, 2020 and Minera Camino Rojo received the CUS permit on February 6, 2020, allowing mine development and operation affecting 816.25 ha. The project as described in the 2021 Camino Rojo Report will require an additional CUS permit to allow for additional surface disturbances related to development of a pit layback onto lands not considered in the August 2019 CUS permit application. The application for the additional CUS permit was submitted to SEMARNAT in February 2023. In July 2023, the permit was declined for procedural reasons due to SEMARNAT’s internal process timelines. We expect to resubmit the additional CUS permit application in 2024.

With respect to the MIA, Minera Camino Rojo received the MIA permit on August 11, 2020, authorizing mine construction and operation of the project described in the 2019 Camino Rojo Report. The project described in the 2021 Camino Rojo Report requires a modification of the MIA permit to allow for additional production related to development of a pit layback onto lands not considered in the August 2019 permit application, which the Company submitted. In March 2022, the Company submitted for a second modification of the MIA permit to allow for the open pit east-west expansion, as well as waste and low-grade ore stockpiles. In 2024, both MIA modifications were not approved by SEMARNAT. The Company is in discussion with SEMARNAT to obtain clarity on the reasons for the non-approval. The Company is in the process of appealing these decisions and will refile a request for modification of the MIA in

Page 25


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2023

United States dollars unless otherwise stated

2024. The Company does not expect these delays in receiving the requested amendments to have an impact on the 2024 production guidance.

Federal regulations require staged postings of a bond or financial guarantee for the estimated cost of reclamation, proportional to the pending reclamation work created by the project in each development phase, as determined by a technical economic study. On November 11, 2020, Minera Camino Rojo submitted the required first stage reclamation bond of 89.5 Mexican Pesos (approximately $4.5 million) which was accepted by the Federal Treasury, with formal notice given to the Procuraduria Federal de Proteccion al Ambiente on November 13, 2020. All MIA and CUS permit conditions were satisfied, which allowed for site activities to commence for the Project described in the 2019 Camino Rojo Report. In November 2023, the reclamation bond was renewed for $210.8 million Mexican Pesos (approximately $12.47 million). The increase related to additional disturbance from site activities.

Minera Camino Rojo currently has all major permits required to operate the project described in the 2019 Camino Rojo Report, including the permits by the Secretaría de la Defensa Nacional for the purchase, storage and use explosives in mining activities. There are no impediments to mining and processing activities for the already authorized project. Minera Camino Rojo commenced the start of earthworks on November 26, 2020. Camino Rojo achieved first gold pour on December 13, 2021 and reached commercial production effective April 1, 2022.

Approximately two-thirds of the Mineral Reserves described below are within the currently permitted mine plan. The remaining portion will require additional permits for an expanded pit, as further described above. These permits are expected to be approved in a reasonable timeline.

HISTORY

The mining concessions comprising the Camino Rojo property were originally staked to the benefit of Canplats de Mexico, S.A. de C.V., a subsidiary of Canplats Resources Corporation (“Canplats”), in 2007. By August of 2008, Canplats drilled a total of 92 RC, and 30 diamond-core holes, for a total of 23,988 and 16,044 m respectively. In October 2009, Canplats publicly released a PEA on the project, which is historical in nature and is no longer current and should not be relied upon.

Canplats was acquired by Goldcorp in early 2010. By the end of 2015, Goldcorp had a total of 295,832 m in 445 diamond core holes, 44,557 m in 188 RC drill holes, and 31,286 m of rotary air blast (“RAB”) drilling had been completed. Airborne gravity, magnetic and transient electromagnetic (“TEM”) surveys were also carried out.

Mineral Reserve and Mineral Resource tabulations for the Camino Rojo Project were publicly disclosed by Goldcorp as recently as June 2016. The Goldcorp estimates are regarded as historical estimates only and have since been replaced by the current Mineral Reserve and Mineral Resource estimates as detailed above under the heading “Summary of Mineral Reserves and Mineral Resources”.

Orla acquired the Camino Rojo Project from Goldcorp in 2017.

For information on mineral production from the Camino Rojo Project subsequent to the 2021 Camino Rojo Report, see “Production, Outlook, and Future Plans” below.

Page 26


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2023

United States dollars unless otherwise stated

GEOLOGICAL SETTING, MINERALIZATION, AND DEPOSIT TYPES

Regional, Local and Property Geology

The Camino Rojo Project deposit is located beneath a broad pediment of Tertiary and Quaternary alluvium along the boundary between the Mesa Central physiographic province and the Sierra Madre Oriental fold and thrust belt near the pre-Laramide continental-margin. Oldest rocks are Triassic metamorphic continental rocks overlain by Early to Middle Jurassic red beds. Upper Jurassic to Upper Cretaceous marine facies rocks overlie the red beds at a disconformity and comprise a package of shelf carbonate rocks comprising the Zuloaga to Cuesta del Cura Formations and the basin-filling flysch sediments of the Indidura and Caracol Formations. The deposit lies within the southern extent of the northwest striking San Tiburcio fault zone.

On the Camino Rojo Project, a gold-silver-zinc-lead deposit lies concealed below shallow (<1 m to 3 m) alluvial cover in a large pediment along the southwest border of the Sierra Madre Oriental. Small water storage pits and trenches expose a portion of the oxide deposit in the discovery area known as Represa zone. The Late Cretaceous Caracol Formation is the primary mineralization host, and at depth, the upper Indidura Formation is a minor mineralization host along the Caracol contact. The gold-silver-lead-zinc deposit is situated above, and extends down into, a zone of feldspathic hornfels developed in the sedimentary strata, and variably mineralized dacitic dikes. The mineralized zones correspond to zones of sheeted sulfidic veins and veinlet networks, creating a bulk-mineable style of gold mineralization. Skarn mineralization has been encountered in the deeper portions of the system. The observed geologic and geochemical characteristics of the gold-silver-lead-zinc deposit at Camino Rojo are consistent with those of a distal oxidized gold skarn deposit. The metal suite and style of mineralization at Camino Rojo are similar to the intrusion-related deposits in the Caracol Formation and underlying carbonate rocks adjacent to the diatremes at the Peñasquito mine.

Mineralization styles in the region include polymetallic and copper-gold skarn and limestone manto (replacement) silver-lead-zinc sulphide ores in the Concepcion del Oro District, approximately 50 km north-northeast of the Camino Rojo Project, and gold-silver-lead-zinc mineralized igneous diatreme-breccia, and sulphide-sulosalt-carbonate veinlets and fracture filings in the Caracol Formation at Newmont’s Peñasquito mine.

Mineralized Zones

The Camino Rojo deposit comprises intrusive related, clastic sedimentary strata hosted polymetallic gold, silver, arsenic, zinc, and lead mineralization.

Three stages of mineralization, including two styles of high-grade gold-silver mineralization, have been observed in the Camino Rojo deposit:

Stage 1 K-metasomatism (adularia)-pyrite – K-metasomatism with disseminated pyrite replaced the mudstone, siltstone and fine-grained sandstones in the Caracol Formation. Mineralization is typically low-grade gold with 0.1-0.4 g/t.
Stage 2 Intermediate Sulphidation (“IS”) veins – IS veins with pyrite-arsenopyrite-sphalerite±galena, calcite and minor quartz. Moderate to high grade gold (0.4 to +4.0 g/t), high zinc grades (0.5 to >2.0% Zn) and high values of As, Pb and Ba, with variable Ag.
Stage 3 LS veins – colloform banded quartz veins, drusy-coxcomb quartz veins, and quartz-cemented, polymictic hydrothermal breccia with pyrite-galena-sulphosalts, adularia and electrum. Moderate to high gold grades (2.0 to 15.0 g/t) with high silver (100 to 500 g/t), and high As and Sb values, but variable to low Zn, Pb, and Ba values.

Page 27


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2023

United States dollars unless otherwise stated

At hand specimen scale, mineralization is controlled by bedding and fractures. The sandy and silty beds of the turbidite sequences of the Caracol Formation are preferentially mineralized, with pyrite disseminations and semi-massive stringers hosted within them, presumably due to higher syn-mineralizing fluid porosity and permeability relative to the enclosing shale beds. Basal layers of the turbiditic sandstone beds are often preferentially mineralized. Bedding discordant open space filling fractures and structurally controlled breccia zones host banded sulphide veins and sulphide matrix breccias. Some higher-grade vein and breccia zones are localized along the margins of dikes of intermediate composition. Gold-silver mineralization has been observed in drill core over vertical intervals greater than 400 m, with gold-silver mineralization occurring in a broad NE-SW trending elongate zone as much as 300 m wide and 700 m long.

Oxidation was observed to range from complete oxidation in the uppermost portions of the deposit, generally underlain or surrounded by a zone of mixed oxide and sulphide mineralization where oxidation is complete along fracture zones and within permeable strata, but lacking in the remainder of the rock, which then is generally underlain by a sulphide zone in which no oxidation is observed. Oxidation of the deposit is approximately 100%, generally extending from surface to depths of 100 m to 150 m and to depths of as much as 400 m along fracture zones. The underlying transitional zone of mixed oxide/sulphide extends over a vertical interval in excess of 100 m and is characterized by partial oxidation controlled by bedding and fractures. The sandy layers of the turbiditic sequence are preferentially oxidized, creating a stratigraphically interlayered sequence of oxide and sulphide material at the centimetre-scale, with oxidation along structures affecting all strata. Gold bearing strata of the of the Caracol Formation are preferentially oxidized and auriferous zones range from partially to completely oxidized, thus the metallurgical characteristics of mixed oxide/sulphide may vary greatly, with some material exhibiting characteristics similar to oxide material.

The 2021 Camino Rojo Report concludes that the distribution of mineralization at Camino Rojo is controlled by both primary bedding and discordant open space filling structures. Pervasive, near surface oxidation extends to depths in excess of 100 m and extends to greater depths along structurally controlled zones of fracturing and permeability.

Deposit Types

The observed geologic and geochemical characteristics of the gold-silver-lead-zinc deposit are consistent with those of a distal oxidized gold skarn deposit. The near surface portion of the Camino Rojo deposit has characteristics consistent with those of the distal skarn zone, transitional to epithermal mineralization, and overlies garnet bearing skarn mineralization encountered in the deeper portions of the system. Skarn deposits often exhibit predictable patterns of mineral zoning and metal zoning. Application of skarn zoning models to exploration allows for inferences about the possible lateral and depth extents of the mineralized system at the Camino Rojo deposit and can be used to guide further exploration drill programs.

EXPLORATION AND DRILLING

2021 Camino Rojo Report

Orla has conducted reconnaissance geological evaluations of portions of its mining concessions. Exploration activities completed included: geologic mapping; rock chip and soil geochemical sampling; and IP geophysical surveys. As of the effective date of the 2021 Camino Rojo Report, 695.2 line-km of IP surveys had been completed in four separate grids over the known area of mineralization, over the proposed area of infrastructure development, and to the west and south of the resource area, and over five separate grids in the Camino Rojo 5 concession. All grids were designed with 400 m line separation and stations every 100 m. Dipole spacing was selected to search for features at depths greater than 100 to 200 m. Chargeability anomalies with some similarities to the Camino Rojo deposit were identified. Three anomalies in the vicinity of the Represa zone were drill tested by nineteen RC holes totalling 5,662.5 m. No significant mineralization was encountered. Five separate IP grids in the Camino 5 claim defined several chargeability anomalies with some similarities to the Camino Rojo Project. As of the date of the 2021 Camino Rojo Report, one of the chargeability anomalies at the Las Miserias target has been drill tested by seven RC drillholes totaling 2,096.5 m. No significant mineralization was encountered.

Page 28


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2023

United States dollars unless otherwise stated

A small orientation soil survey was conducted over the resource area and 66 soil samples were collected. Results from the survey indicate the geochemical “halo” over the deposit is tightly restricted to sub/outcrop. Anomalous gold (>0.2 g/t) is most closely associated with elevated arsenic (>100 parts per million (“ppm”)) and zinc (>300 ppm). More than 1,500 rock chip samples have been collected from throughout the mining concessions comprising the project. No significant rock chip gold anomalies were identified, but low-level anomalies were detected in the Las Miserias area, associated with a silicified breccia and a chargeability anomaly.

Regional exploration continues to field check interpreted targets, consisting of coincident historical geochemical, airborne geophysical and satellite imagery anomalies. Ten areas of alteration of sedimentary strata have been identified, and although no significant geochemical results have been returned from them to date, they are considered of interest as possible distal alteration zones to mineralized areas.

The drillhole database used for the Feasibility Study contains 911 drillholes and 370,566 m of drilling. During 2007 and 2008, Canplats drilled 121 holes for 39,831 m of drilling, about 11% of the drilling by metres. This was 92 RC holes and 29 core holes. Between 2011 and 2015, Goldcorp drilled 779 holes for 328,587 m of drilling. These were 95 RC holes, 306 RAB holes, and 378 core holes. The 2015 holes and some of the late 2014 holes were drilled for geotechnical investigations. Orla drilling included in the Mineral Resource estimate was conducted during 2018 and consisted of 6 RC holes for 803 m of drilling and 5 core holes for 1,345 m of drilling, totalling 11 holes and 2,148 m of drilling. There was limited non-resource drilling completed by Orla in 2018, 2019, and 2020.

The 2021 Camino Rojo Report concludes that the drilling and sampling procedures for the Camino Rojo drill samples are reasonable and adequate and there do not appear to be any drilling, sampling, or recovery factors which would materially impact the accuracy and reliability of the results that are included in the database used for the Mineral Resource estimate or the Mineral Reserve estimate.

Analytical work comparing various drilling campaigns and drilling types indicates potential down hole contamination in some of the wet Canplats RC drilling. The suspect sample intervals were not used for the resource modeling for the 2021 Camino Rojo Report. This impacted about 2,100 m, or about 5%, of the Canplats drilling.

In addition to the 11 holes drilled by Orla used in the Mineral Resource model database, through the effective date of the 2021 Camino Rojo Report, Orla completed geotechnical, metallurgical, condemnation, regional exploration, sulphide zone exploration, and water exploration and development drilling totalling 21.8 km, as summarized in the table below.

Non-Resource Drilling Completed by Orla, 2018, 2019 and 2020

Purpose

    

Drillhole Type

    

Total Number of Holes

    

Total (m)

Clay Exploration

DDH

5

56.00

Condemnation

RC

7

1,767.85

Geotech Infrastructure Substrate

 

DDH

 

19

 

323.35

Geotech/Condemnation

 

DDH

 

4

 

642.00

Metallurgy

 

DDH

 

14

 

2,288.50

Infill/Sulphide Zone

 

DDH

 

3

 

1,959.70

Regional Exploration

 

RC

 

26

 

7,748.50

Monitoring Wells

 

RC/rotary

 

11

 

916.51

Water Exploration

 

RC

 

16

 

5,340.51

Water Production

 

RC/rotary

 

2

 

715.60

Page 29


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2023

United States dollars unless otherwise stated

The clay exploration drilling indicated that clay required for leach pad and pond construction is present but was not able to confirm adequate amounts. The condemnation holes verified that the proposed sites for project infrastructure will not impede development of Mineral Resources. The geotechnical holes provided the information necessary to determine pit slope stabilities and design criteria for the process plant, leach pad, waste dumps, and ponds, and confirmed that the proposed locations for each are suitable. Metallurgical drillholes provided material for testing. The water exploration, monitoring, and development drilling provided information needed for hydrologic modeling and indicated that wells at the project site can provide an adequate water supply to the Camino Rojo Project.

Exploration Subsequent to the 2021 Camino Rojo Report

2021 Exploration

In addition to the Camino Rojo sulphide zone directional diamond drilling program (started in Q4 2020) that was completed in early April 2021 (4,119 metres drilled in 2021, of the 2020-21 program totaling 6,079m), the Camino Rojo regional exploration program continued in 2021 and included geophysical airborne (drone) magnetic survey (approximately 319 square km), RAB reconnaissance drilling as well as soil geochemical sampling and mechanical trenching. In addition, a geophysical IP (induced polarization) survey totaling 85.7 line-km has been completed. This target definition work led to the definition of exploration targets to the north-east and south-west of the Camino Rojo deposit as well as over an area located 3 km to the south.

2022 Exploration

Near-mine exploration continued in 2022 and consisted of directional diamond drilling at the Camino Rojo sulphide zone (9,174 m drilled) as well as conventional diamond drilling to test for near-pit oxide mineralization extension (3,093 m drilled). Drilling at the Camino Rojo sulphide zone has continued to confirm the continuity of wider, higher-grade (>2 g/t) gold mineralization and better defined the geological controls on gold mineralization. Near-pit oxide extension drilling has indicated potential for additional oxide material near the current ultimate pit boundaries.

Regional exploration also continued in 2022. The regional exploration program included geophysical airborne (drone) magnetic survey (approximately 271 square km), induced polarization survey (approximately 125 line-km), and RAB, RC, and diamond drill core drilling of priority exploration targets to the northeast and southwest of the Camino Rojo Oxide Mine deposit.

2023 Exploration

In 2023, Orla conducted near-mine exploration drilling, completing 2,500 meters of core drilling to validate oxide gold mineralization on the Fresnillo plc property that is subject to the Layback Agreement. This area is situated directly north of and adjacent to the Camino Rojo Oxide Mine open pit. Additionally, Orla executed 4,000 meters of drilling, focusing on extending oxide gold mineralization along key structures that control deeper levels of oxide mineralization, both within and beyond the existing design of the oxide open pit.

Orla also completed 35,070 meters of directional and conventional drilling to complete the infill drilling program of higher-grade parts of the Camino Rojo Sulphides deposit. Selected drillholes on the infill program were also extended to test potential extensions of sulphide mineralization below the currently defined Mineral Resource (referred to as the Camino Rojo Extension). Additionally, a separate drill section consisting of four drillholes (2,607 meter) was executed 450 metres down plunge of the existing resources. This drill section tested and confirmed the open extension of the mineralization into lower stratigraphic formations.

Regional exploration also continued in 2023. The regional program included drill testing exploration targets along the northwest-southeast mine trend and northwest-southeast mine trend. Target generation activities also continued, including geophysical airborne (drone) magnetic survey (approximately 207 square km) ground gravity survey (approximately 66 square km), soil geochemical survey, geological mapping and prospecting.

Page 30


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2023

United States dollars unless otherwise stated

See “Production, Outlook, and Future Plans” below for information on planned exploration activities subsequent to December 31, 2023.

SAMPLING, ANALYSIS, AND DATA VERIFICATION

Drilling and survey procedures observed are to acceptable industry standards, are appropriate to the deposits being drilled and are appropriate for Mineral Resource estimation.

Core and RC samples are commonly taken at one and half metre intervals. According to the current procedures, the core sample intervals take into consideration the boundaries between different material and rock types. All samples are immediately removed from the field upon drilling and core is marked up in the core shed in a secure facility located at the exploration camp. Drill core sampling intervals are defined then cut in half with a diamond saw along the core length. Samples are collected by an ALS Minerals truck and driven directly to the ALS sample preparation facility in Zacatecas.

All gold results at Camino Rojo were obtained by ALS Minerals (Au-AA23) using fire assay fusion and an atomic absorption spectroscopy finish. All samples are also analyzed for multi-elements, including silver, copper, lead and zinc using a four-acid digestion with ICP-AES finish (ME-ICP61) method at ALS Laboratories in Canada. If samples were returned with gold values in excess of 10 ppm or base metal values in excess of 1% by ICP analysis, samples are re-run with gold (Au-GRA21) by fire assay and gravimetric finish or base metal by (OG62) four acid overlimit methods.

Drill program design, Quality Assurance/Quality Control and interpretation of results were performed by qualified persons employing a Quality Assurance/Quality Control program consistent with NI 43-101 and industry best practices. Standards were inserted at a frequency of one in every 50 samples, and blanks were inserted at a frequency of one in every 50 samples for Quality Assurance/Quality Control purposes by the Company as well as the lab.

ALS Laboratories is independent of Orla. There are no known drilling, sampling, recovery, or other factors that could materially affect the accuracy or reliability of the drilling data at Camino Rojo.

MINERAL PROCESSING AND METALLURGICAL TESTING

Historical metallurgical test work programs on the Camino Rojo property were commissioned by the prior operators of the project between 2010 and 2015. A confirmatory metallurgical test program was commissioned by Orla in 2018 to confirm the results and conclusions from the previous campaigns. In total, 107 column leach tests (85 on representative samples for the material types and pit area) and 164 bottle roll tests had been completed to date the date of the 2021 Camino Rojo Report on the Camino Rojo ore body as well as physical characterization and preliminary flotation test work.

Based on the metallurgical tests completed on the Camino Rojo deposit, key recovery parameters (based on an 80 days leach cycle) include:

Estimated gold recoveries (including 2% field deduction) of:
70% for Kp Oxide;
56% for Ki Oxide;
60% for Trans-Hi; and
40% for Trans-Lo;
Estimated silver recoveries (including 3% field deduction) of:
11% for Kp Oxide;
15% for Ki Oxide;
27% for Trans-Hi and

Page 31


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2023

United States dollars unless otherwise stated

34% for Trans-Lo.

The key design parameters are based on a substantial number of metallurgical tests including 85 column leach tests on samples representative of domains in the current deposit model. These 85 representative samples from documented drill holes with good spatial distribution in the proposed pit include 41 columns tests on Kp Oxide material, 7 column tests on Ki Oxide material, 16 column tests on Trans-Hi material and 21 column tests on Trans-Lo material. The 22 non-representative columns were excluded based on materials not in the Mineral Reserves and samples outside pit area.

An additional 54 bottle roll leach tests with direct correlations with the column tests have been included as part of the evaluation to support these results and conclusions.

In general, the Camino Rojo deposit shows variability in gold and silver recoveries based on material type and geological domain with preg-robbing organic carbon being the only significant deleterious element identified, which is primarily associated with the transition material at depth along the outer edges of the deposit. Recoveries for the oxide material are good and will yield acceptable results using conventional heap leaching methods with cyanide. Recoveries for the transition material are lower compared with the oxide material for conventional leaching with some areas of transition showing reasonably high recoveries. Reagent consumptions for all material types are reasonably low.

Preg robbing, a phenomenon where gold and gold-cyanide complexes are preferentially absorbed by carbonaceous, and to a lesser extent, other material within the orebody, presents a low risk to the overall project. A significant investigation by Orla into the preg robbing material indicates that potentially preg robbing material represents a small percentage of the total material to be processed and will not be encountered until later in the project life and can be mitigated by proper ore control.

Since the start of operations in commercial production on April 1, 2022, site laboratory testing and external third-party laboratory tests are completed regularly to ensure the gold and silver recovery estimates, along with other processing parameters, are appropriately calibrated for production forecasting and Mineral Reserves.

MINERAL RESOURCE ESTIMATES

See “Summary of Mineral Reserve and Mineral Resource Estimates” above for the Mineral Resources estimate table.

The Mineral Resource estimate includes potential mill resources, which are sulphide dominant, and the potential heap leach resources, which are oxide dominant and were the emphasis of the 2021 Camino Rojo Report. The Mineral Resources are based on a block model developed by IMC during November 2023. This updated model incorporated recent Orla drilling program and updated geologic models.

The gold and silver Mineral Resource includes material amenable to heap leach recovery methods (leach material) and material amenable to mill and flotation concentration methods (mill material). The resources amenable to heap leach methods are oxide dominant and were the emphasis of the updated Feasibility Study.

The lead and zinc Mineral Resources are in sulphide dominant material and are recovered along with the gold and silver in the mill material.

The Mineral Resources from the leach material are reported inclusive of those Mineral Resources that were converted to Mineral Reserves. The Mineral Resources from the mill material were excluded from the mine design in the 2021 Camino Rojo Report and the current year-end 2023 Mineral Reserves estimate.

Page 32


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2023

United States dollars unless otherwise stated

There are certain risks associated with the Mineral Resource estimate that investors should be aware of. Please see “Risk Factors – The Camino Rojo Project Mineral Resource estimate assumes that the Company can access mineral titles and lands that are not controlled by the Company” and “Risk Factors – Mineral Resource estimations for the Camino Rojo Project are only estimates and rely on certain assumptions”.

Except as set out herein, neither the Company nor the authors of the 2021 Camino Rojo Report believe that there are significant risks to the Mineral Resource estimates based on environmental, permitting, legal, title, taxation, socio-economic, marketing, or political factors. The Camino Rojo Project is in a jurisdiction friendly to mining. The most significant risks to the Mineral Resource are related to economic parameters such as prices lower than forecast, recoveries lower than forecast, or costs higher than the current estimates.

The Mineral Resource estimate was prepared based on the Qualified Person’s reasoned judgment, in accordance with CIM Best Practices Guidelines and his professional standards of competence, that there is a reasonable expectation that all necessary permits, agreements and approvals will be obtained and maintained, including the additional agreement with Fresnillo to allow mining of waste material on its mineral concessions. In particular, when determining the prospects for eventual economic extraction, consideration was given to industry practice, and a timeframe of 10-15 years.

MINERAL RESERVE ESTIMATES

See “Summary of Mineral Reserve and Mineral Resource Estimates” above for the Mineral Reserves estimate table.

The effective date of the updated Mineral Reserve estimation is December 31, 2023. The Mineral Reserve estimation is based on an open pit mine plan and mine production schedule developed by Orla. Processing is based on crushing and heap leaching to recover gold and silver. The Mineral Reserve, relies on the Mineral Resources with an effective date of December 31, 2023, is based on a gold price of $1,500 per ounce and a silver price of $20.00 per ounce. Measured Mineral Resource in the mine production schedule was converted to Proven Mineral Reserve and Indicated Mineral Resource in the schedule was converted to Probable Mineral Reserve.

The Mineral Reserve estimate was calculated based on an NSR considering the gold and silver proportions with a block. The NSR cut-off is US$7.34 per tonne, which includes the processing, G&A, ore rehandle, and sustaining capital costs.

The Mineral Reserve estimate includes allowances for mining dilution and ore loss as compositing assays into composites and estimating blocks with multiple composites introduces some smoothing of model grades that are analogous to dilution and ore loss effects. Current pit surfaces and new cost assumptions were used in the dilution and ore loss comparison. The Company believes that reasonable amounts of dilution and loss were incorporated into the block model used for the Mineral Reserve estimate.

All of the mineralization comprised in the Mineral Reserve estimate with respect to the Camino Rojo Project is contained on mineral titles controlled by Orla. In the 2021 Camino Rojo technical report, all material to be mined on the Fresnillo mineral concession was considered waste, however, the current Mineral Reserves does not include such constraint as per the Layback Agreement. See “Mineral Projects – Camino Rojo – Project Description, Location, and Access” for additional information.

Approximately two-thirds of the Mineral Reserves are within the currently permitted mine plan. The remaining portion will require a CUS and related permit amendments for an expanded pit.

Orla does not believe that there are significant risks to the Mineral Reserve estimate based on metallurgical or infrastructure factors or environmental, permitting, legal, title, taxation, socio-economic, marketing, or political factors. There has been a significant amount of metallurgical testing and the infrastructure requirements are relatively straightforward compared to many operations. However, recoveries lower than forecast would result is loss of revenue for the project. There has also been some potential preg-robbing material identified in the deposit, as discussed in the 2021 Camino Rojo Report, but this does not appear to represent a significant risk.

Page 33


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2023

United States dollars unless otherwise stated

There is risk to the Mineral Reserve estimate based on mining factors. The slope angle assumptions are based on careful application of wall control blasting. Failure of the wall control blasting to perform as expected would result in less ore available for the process plant and potentially a shorter project life. Other risks to the Mineral Reserve estimate are related to economic parameters such as prices lower than forecast or costs higher than the current estimates. The impact of these is modeled in a sensitivity analysis on a regular basis.

MINING OPERATIONS

Camino Rojo open pit mining commenced in August 2021.

The Camino Rojo mine is a conventional open pit mine. Mine operations consist of drilling medium diameter blast holes (approximately 17 cm), blasting with either explosive slurries or ammonium nitrate/fuel oil (“ANFO”) depending on water conditions, and loading into large off-road trucks with hydraulic shovels and wheel loaders. Ore is delivered to the primary crusher and waste is delivered to the waste storage facility southeast of the pit.

Contract mining services is used at the Camino Rojo open pit and is currently provided by PEAL MÉXICO, S.A. DE C.V. The contractor’s loading units consists of 120 t class backhoe excavators and 130 t class wheel loader, while the main hauling truck fleet has a capacity of 100 t.

The mine plan is based on three mining phases. The phase 1 starter pit will target relatively high-grade Mineral Reserves in the central portion of the deposit. Phase 2 pushes the pit to final mining limits in the south and in a portion of the east and west side. The phase 3 final pit pushes walls to final positions in the north, east and west side. The mine plan was developed to supply ore to a conventional crushing and heap leach facility with the capacity to process 18,000 tonnes per day (“tpd”). There is also a low-grade stockpile facility to store marginal resource for processing at the end of commercial pit operations.

In 2023, the majority of the mining occurred in Phase 1 with some small amounts of stripping in Phase 2. The total material moved in 2023 was 11,598,551 tonnes with 7,436,960 of ore at an average gold grade of 0.75 g/t Au containing 179,083 ounces of gold.

PROCESSING AND RECOVERY OPERATIONS

Camino Rojo Project commenced operation in October 2021, followed by the stacking circuit in November 2021 and the Merrill-Crowe plant in December 2021. The first gold pour occurred on December 13, 2021 and commercial production was achieved effective April 1, 2022. Ore delivered from mine to the crushing circuit using haul trucks which will direct-dump into a dump hopper; front-end loaders will feed material to the dump hopper as needed from a run of mine (“ROM”) stockpile located near the primary crusher. The ore is crushed to a final product size of 80% passing 28mm (100% passing 38mm) using a two-stage closed crushing circuit. The crushing circuit will operate 7 days/week, 24 hours/day with an overall estimated availability of 75%.

The crushed product is stockpiled using a fixed stacker, reclaimed by belt feeders to a reclaim conveyor, and conveyed to the heap stacking system by an overland conveyor system. Pebble lime is added to the reclaim conveyor belt for pH control; agglomeration with cement is not needed.

Page 34


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2023

United States dollars unless otherwise stated

Stacked ore is leached using a drip irrigation system for solution application; sprinkler irrigation will be used after several years of operations to increase evaporation rates and avoid the need for water treatment from pit dewatering. After percolating through the ore, the gold and silver bearing pregnant leach solution will drain by gravity to a pregnant solution pond where it is collected and pumped to a Merrill-Crowe recovery plant. Pregnant solution is pumped through clarification filter presses to remove any suspended solids before being deaerated in a vacuum tower to remove oxygen. Ultra-fine zinc dust is added to the deaerated pregnant solution to precipitate gold and silver values, which is collected by precipitate filter presses. Barren leach solution leaving the precipitate filter presses flows to a barren solution tank and is then pumped to the heap for further leaching. High strength cyanide solution is injected into the barren solution to maintain the cyanide concentration in the leach solutions at the desired levels.

The precipitate from the Merrill-Crowe recovery plant is processed in the refinery. Precipitate is treated by an electric mercury retort with a fume collection system for drying and removal of mercury before being mixed with fluxes and smelted using an induction smelting furnace to produce the final doré product.

An event pond and pregnant solution pond are used to collect contact solution from storm or solution surge events if required. Solution collected will be returned to the process as soon as practical. Evaporators will be installed in the event pond after several years of operation, or as needed, to control excess solution generated by pit dewatering.

Camino Rojo is design for an annual process capacity of 6.57 million tonnes at a crushing rate of 18,000 tonnes per day.

The gold recoveries for oxide material ranges from 56% to 70% and transitional material ranges from 40% to 60%, with the overall gold recovery around 62%. The silver recoveries for oxide material ranges from 11% to 15% and transitional material ranges from 27% to 34%, with the overall silver recovery of 20%.

In 2023, Camino Rojo stacked 7,005,694 tonnes at an average gold grade of 0.79 g/t Au for a total of 121,877 oz gold produced.

INFRASTRUCTURE

Camino Rojo buildings are primarily prefabricated steel buildings or concrete masonry unit buildings and include an administration building, mine camp facilities, a Merrill-Crowe Process Facility, refinery, laboratory, process maintenance workshop, reagent storage building, mine truck shop, contractor mine office building, light duty truck shop, fuel stations, warehouse, explosives magazine, guard house, and medical clinic.

Power supply to the Camino Rojo Project is connected to the national grid at Concepción del Oro. Overhead powerlines connect 34.5 kV, three phase and 60 Hz power system, to a metering and switching substation located nearby. Power from the main substation is distributed at 34.5 kV. Emergency power generators supply electric power to critical process equipment, the mine camp, and the raw water pumping system. Internet and limited cellular communications are currently available, though these systems will be expanded for operations.

Total site water supply is sourced from production wells located within the property boundary. Total water consumption for 2023 averaged 23 liters per second (“L/s”) with a peak water demand of 37 L/s. Several production wells have been drilled between 2 km to 4 km from the raw water tank.

The project infrastructure includes a one km by 30 m air strip to allow for small passenger planes to land and take off at the project site. The air strip does not include any infrastructure or provisions for fueling or maintenance of planes or other aircraft.

The onsite operations camp consists of 112 rooms with a capacity of 176 persons.

Page 35


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2023

United States dollars unless otherwise stated

Additional infrastructure for the Camino Rojo Project includes an-exploration office, core preparation, and storage facility located in San Tiburcio.

ENVIRONMENTAL STUDIES, PERMITTING, AND SOCIAL OR COMMUNITY IMPACT

Baseline environmental studies required for mine permitting were commissioned by Orla in April 2018 and were completed in May 2019 by independent consultants.

A key objective of the Company is to design, build and operate the Camino Rojo Project in such a way that it does not cause significant adverse effects during construction, operation, closure, and post-closure. To aid this objective, a number of environmental management plans were developed prior to the start of construction. Reclamation will be undertaken during mining activities where possible, but the majority of work will occur after the completion of mining and final gold recovery. The reclamation land use objective will be to return the land to its traditional use as a grazing area for goats and wildlife habitat. Costs for concurrent reclamation and closure have been estimated at $28.6 million over the life of the project (in addition to $7.6 million for G&A costs during closure activities). These costs are in addition to any reclamation and closure costs considered in the normal operating and sustaining cost estimates.

Through the agreements established with the ejidos of San Tiburcio, El Berrendo, La Pardita, and San Francisco de los Quijano, the Company has committed to making fair payments for land leases, which have allowed the Company to continue its activities of exploration and mining without interruption. These agreements entail commitments to various forms of social support, including scholarships, upgrades to community infrastructure, initiatives for social and economic development, impact investments, as well as provisions of food and medicines to support the most vulnerable members of the community. The agreements follow procedures and frameworks determined by the Mexican Agrarian Law. Furthermore, the Company has instituted a community response mechanism to address and resolve community requests, concerns, and complaints. The Company also maintains a dedicated community relations team to ensure the effectiveness of its corporate social responsibility initiatives.

CAPITAL AND OPERATING COST

Item

   

2023 Actual

   

2024 Guidance

Sustaining Capital ($m)

 

9.4

 

18.0

Non-Sustaining Capital ($m)

 

11.4

 

13.0

All-In Sustaining Cost ($/oz)

 

736

 

875-975

Camino Rojo’s sustaining capital expenditures during 2023 were $9.4 million, which included part of the construction of an ore stockpile dome cover for dust mitigation and other several small operational improvement activities.

Page 36


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2023

United States dollars unless otherwise stated

PRODUCTION, OUTLOOK, AND FUTURE PLANS

Production

Camino Rojo achieved first gold pour in December 2021 and commercial production was achieved effective April 1, 2022. The following table sets forth production at Camino Rojo since the first gold pour in December 2021. For additional information, see the heading “Discussion of Operations – Camino Rojo Operational Update” in the Company’s management’s discussion and analysis for the financial year ended December 31, 2023.

Mined Grade(1)

Stacked Grade

Gold Production

Year

    

Ore Mined (t)

    

 (g/t)

    

Ore Stacked (t)

    

 (g/t)

    

(oz)

2021

 

2,058,041

 

0.71

 

1,188,328

 

0.74

 

2,422

2022

 

8,299,621

 

0.71

 

6,882,063

 

0.82

 

109,596

2023

 

7,436,960

 

0.75

 

7,005,694

 

0.79

 

121,877


Note: (1) Includes low grade material that was stockpiled.

Production in 2024 will continue from the Phase 1 pit while pushing back to the next phases of the pit. Camino Rojo is expected to produce 110,000 oz to 120,000 oz at an AISC of between $875-975/oz. Sustaining capital expenditures is expected to increase from $9.4 million in 2023 to $18.0 million in 2024 and is primarily related to the heap leach pad expansion and new water well construction. Non-sustaining capital expenditures is expected to increase from $11.4 million in 2023 to $13.0 million in 2024, with the capitalized sulphide exploration drilling as the main contribution.

Planned 2024 Exploration

In 2024, Orla expects to continue both near-mine and regional exploration initiatives. Building upon the successes of 2023, near-mine exploration will focus on testing the potential for additional structurally controlled oxide mineralization southeast of the current pit extents in the near-surface. Furthermore, Orla intends to continue drill testing at depth for poly-metallic deposits located beneath the currently defined Mineral Resources. Regional exploration will extend into 2024, involving drill testing of priority exploration targets on the Camino Rojo property. Target generation work, consisting of geochemical and geophysical surveys, prospecting and mapping will also continue in 2024.

THE SOUTH RAILROAD PROJECT

The following disclosure relating to the South Railroad Project has been derived, in part, from the technical report entitled “South Railroad Project Form 43-101F1 Technical Report Feasibility Study, Elko County, Nevada” dated March 14, 2022, with an effective date of February 23, 2022 (the “South Railroad Report”), prepared by Matthew Sletten, PE, of M3 Engineering & Technology Corp. (“M3”), Benjamin Bermudez, PE, of M3; Art S. Ibrado, PE, of Fort Lowell Consulting PLLC; Michael S. Lindholm, CPG, of RESPEC; Thomas Dyer, PE, of RESPEC; Jordan Anderson, QP RM-SME, of RESPEC; Gary L. Simmons, QP-MMSA, of GL Simmons Consulting, LLC; Richard DeLong, QP-MMSA, RG, PGm of EM Strategies; and Kevin Lutes, PE, of NewFields Mining Design & Technical Services, each of whom is independent of the Company and a qualified person under NI 43-101.

The South Railroad Report was prepared for Gold Standard. Following the Company’s acquisition of Gold Standard, the Company filed the technical report under its profile on SEDAR+ at www.sedarplus.ca and on EDGAR at www.sec.gov. Reference should be made to the full text of the South Railroad Report, as it contains additional assumptions, qualifications, references, reliances, and procedures that are not fully described herein.

Page 37


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2023

United States dollars unless otherwise stated

PROPERTY DESCRIPTION, LOCATION, AND ACCESS

The South Railroad Project is situated on the Railroad-Pinion property, which comprises two contiguous areas of mineral tenure held by the Company that straddle the Piñon Range in the Railroad mining district at the southeast end of the Carlin trend, a northwest-southeast trending belt of prolific gold endowment in northern Nevada. In previous technical reports, the northern portion of the land holdings, now referred to as the North Railroad portion of the property, has been referred to as the Railroad project and the Railroad property. The southern portion of the Railroad-Pinion property, now referred to as the South Railroad portion of the property, was referred to as the Pinion project and the Pinion property in previous technical reports. In November 2017, Gold Standard published a technical report on the Railroad-Pinion property, which included a Mineral Resource estimate for the North Bullion, POD, and Sweet Hollow gold deposits, located in the North Railroad portion of the Railroad-Pinion property, approximately 6 miles north of the Dark Star and Pinion deposits. Based on available information, North Bullion, POD, and Sweet Hollow would not likely share a common mining infrastructure with Dark Star and Pinion.

The Railroad-Pinion property in the Piñon Range is accessed primarily from the four-lane transcontinental U.S. Interstate 80 (“I-80”), approximately 275 miles west of Salt Lake City, Utah, and 290 miles east of Reno, Nevada. The project is located between 8 and 18 miles south of I-80 and can be reached by a series of paved and gravel roads from Elko, Nevada (population 18,300). The property is centered approximately at UTM NAD27 Zone 11 coordinates of 585,000E and 4,480,000N.

The North and South Railroad portions of the Railroad-Pinion property constitute a combined land position totaling 53,570 acres, and with partial interests taken into consideration, 50,600 acres net acres of land in Elko County, Nevada. The Company owns, or otherwise controls 100% of the subsurface mineral rights on a total of 29,942 acres of land held as patented and unpatented lode claims. This includes 1,455 unpatented claims owned by the Company and 207 unpatented claims held under lease. The Company also owns or leases 30 patented claims. There is also a total of 23,628 gross acres of private lands of which the Company’s ownership of the subsurface mineral rights varies from 49.2% to 100%, for a net position of approximately 20,658 gross acres.

Private surface and private mineral property are wholly owned and subject to lease agreement payments and property taxes (paid on an annual basis) as determined by Elko County. Unpatented lode mining claims grant the holder 100% of the locatable mineral rights and access to the surface for exploration activities which cause insignificant surface disturbance. Ownership of the unpatented mining claims is in the name of the holder (locator), subject to the paramount title of the United States of America, under the administration of the United States Bureau of Land Management (the “BLM”). Under the Mining Law of 1872, which governs the location of unpatented mining claims on federal lands, the locator has the right to explore, develop, and mine minerals on unpatented mining claims without payments of production royalties to the U.S. government, subject to the surface management regulation of the BLM. Currently, annual claim-maintenance fees are the only federal payments related to unpatented mining claims. The mineral rights do not expire if the unpatented claims are maintained by paying an annual fee of $165 per claim to the U.S. Department of Interior, BLM prior to the end of the business day on August 31 every year. A notice of intent to hold must also be filed with the Elko County Recorder on or before November 1 annually, along with a filing fee of $12.00 per claim, plus a $4.00 document fee.

The Company has completed its federal claim maintenance fee obligations for the owned and leased unpatented claims for the 2023-2024 assessment year. As of the date of this AIF, the Company’s estimated claim maintenance fee cost for 2024 for the owned and leased unpatented claims is $387,788, and the Company’s total estimated cost to maintain its property package for 2024 is $2,658,564.

Portions of the unpatented and private lands are encumbered with royalties predominantly in the form of standard Net (or Gross) Smelter Return (“NSR” or “GSR”) and Mineral Production (“MP”) royalty agreements, or Net Profit Interest (“NPI”) agreements, ranging from 1% to 5%. Additional details as well as the locations and aerial distribution of the currently relevant royalty encumbrances for the South Railroad Project are set forth in Section 4.2 of the South Railroad Report.

Page 38


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2023

United States dollars unless otherwise stated

As of the effective date of the South Railroad Report, the authors thereof were not aware of any significant factors or risks that may affect access, title, or the right or ability to perform work on the property. The Company controls sufficient ground and has sufficient permitting in place to access the project and continue future exploration programs. See “Environment and Permitting” below for additional information.

HISTORY

The Railroad–Pinion property is being explored on an ongoing basis by the Company using geological mapping, geochemical and geophysical surveying, and drilling. Exploration work by Gold Standard commenced in 2010 and resulted in the identification of 17 prospect areas or zones of mineralization within the property.

Twenty-one different historical operators are known to have drilled 1,084 holes, for a total of 500,544.1 ft, from 1969 through 2008. As of the database effective dates of the South Railroad Report, Gold Standard had drilled 1,121 holes for a total of 953,112 ft. At least 80% of all drilling used RC methods. However, the amount of RC drilling may be understated because the hole-types are not known for a substantial number of holes drilled in the late 1980s and 1990s, when RC drilling was common. See “Drilling” below for additional information on historic drilling.

Several historical Mineral Resource estimates have been estimated by a variety of companies for the Pinion, Dark Star, and POD deposits. These historical Mineral Resources are superseded by the current Mineral Resources presented under the heading “Summary of Mineral Reserves and Mineral Resources” above. See Section 6 of the South Railroad Report for additional information on historical estimates on the South Railroad Project.

The North Railroad portion of the property covers the historic Railroad district. Sources cited in the South Railroad Report suggested that historic production records for the district are not very reliable for the period between 1869 and 1905. Only the total volumes of tons mined, and commodity produced were reported, if they were reported. These sources estimated the total value of production through 1956 to be worth $2 million using the value of the commodity produced for the year it was produced. A reported 43,940 total tons of ore were mined with mineral production distributed as follows:

Gold - 6,918 ounces
Silver - 382,000 ounces
Copper - 2,850,000 pounds
Lead - 4,340,000 pounds
Zinc - 372,000 pounds

There has been no mineral production reported for the South Railroad portion of the property.

See “Outlook and Future Plans” below for additional information on Gold Standard and the Company’s activities on the property after the date of the South Railroad Report.

Page 39


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2023

United States dollars unless otherwise stated

GEOLOGICAL SETTING, MINERALIZATION AND DEPOSIT TYPES

The South Railroad Project is located in the southern portion of the Carlin trend, centered on the Railroad dome in the Piñon Range, which is comprised of Ordovician through Permian marine sedimentary rocks. Eastern assemblage formations throughout the property include the Pogonip, Hanson Creek, Eureka Quartzite, Lone Mountain Dolomite, Oxyoke, Beacon Peak, Sentinel Mountain Dolomite, and Devils Gate Limestone and Tripon Pass formations. Siliceous clastic units include those of the Webb, Chainman, and Tonka formations. The north-south-striking Bullion fault corridor separates Tertiary volcanic rocks to the east from the Paleozoic sedimentary units in the range, which have been intruded by a complex of Eocene igneous rocks centered south of Bald Mountain, in the core and east flank of the range.

The gold-silver deposits within the South Railroad Project that are the focus of the South Railroad Report are considered to be Carlin-type, sedimentary-rock-hosted deposits. Precious metal mineralization is generally submicroscopic, disseminated, and hosted principally in sedimentary rocks, with some mineralization in felsic dikes and sills as well.

In the South Railroad portion of the property, the Dark Star Main and Dark Star North zones, which comprise the Dark Star deposit are hosted primarily within Pennsylvanian-Permian rocks, with minor amounts of gold mineralization found in the Chainman Formation and Tertiary conglomerates. The deposits are centered along the roughly north-south Dark Star fault corridor, within which is a horst block and associated silicified zone bounded by the West fault and Dark Star fault. Gold mineralization in the horst block is hosted in the middle, coarse-grained conglomeratic and bioclastic limestone-bearing unit of a Pennsylvanian-Permian undifferentiated sequence interpreted to be equivalent to the Tomera Formation. Mineralization dips steeply to the west near the surface at Dark Star Main and Dark Star North, but dips less steeply at depth at Dark Star Main.

Also, in the South Railroad portion of the property, the Pinion deposit is situated in a sequence of Paleozoic sedimentary rocks exposed within large horst blocks in which the sedimentary rocks have been broadly folded into a south- to southeastward-plunging, asymmetric anticline. The axis of this Pinion anticline trends approximately N50ºW to N60ºW and can be traced for approximately 2.0 mi (3.2 km). The limbs of the anticline dip shallowly at 10° to 25° to the west, and more steeply at 35° to 50° to the east. Disseminated gold and silver mineralization at the Pinion deposit is strongly controlled by a 10 ft to 400 ft-thick (3 m to 120 m-thick) dissolution-collapse breccia at the contact between calcarenite of the Devils Gate Limestone and the overlying silty micrite of the Tripon Pass Formation. Gold deposition was contemporaneous with breccia development, quartz veins formation, silica ± barite replacement, and infill of open spaces.

The Jasperoid Wash disseminated gold deposit, also located in the South Railroad portion of the property, is hosted by altered Tertiary feldspar porphyry dikes and their host Pennsylvanian-Permian conglomeratic rocks of a Tomera Formation equivalent. The deposit has approximate extents of 4,600 ft (1,400 m) to the north and a width of about 3,600 ft (1,100 m), and is partially contained within an elongate, north to south, steeply dipping structural corridor. Drilling shows the deposit dips steeply to the west nearby and within Tertiary dikes; east of the dikes, the deposit dips gently to the west. The gold is Inferred to be submicroscopic in grain size, however, petrographic studies have yet to be performed.

In the North Railroad portion of the property, disseminated gold mineralization has been defined by drilling in the North Bullion, POD, and Sweet Hollow zones. The mineralization is focused in the footwall of the Bullion fault zone. Faults appear to be important controls on mineralization. In general, gold-silver mineralization is localized in gently to moderately dipping, strongly sheared rocks of the Webb and Tripon Pass formations, in dissolution-collapse breccia developed above and within silty micrite of the Tripon Pass Formation, and calcarenite of the Devils Gate Limestone. The top of gold mineralization varies from 350 ft to 1,300 ft (105 m to 400 m) below the surface and varies in dip from 10° to 45° to the east. Gold is associated with “sooty” sulfide minerals, silica, carbon, clay, barite, realgar, and orpiment.

Page 40


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2023

United States dollars unless otherwise stated

EXPLORATION

The South Railroad Report summarizes exploration efforts by Gold Standard through to February 23, 2022, the date of the South Railroad Report. See “Outlook and Future Plans” below for information on exploration activities completed by Gold Standard and Orla subsequent to such date.

The Railroad–Pinion property was explored on an ongoing basis by Gold Standard using geological mapping, geochemical and geophysical surveying, and drilling. Prior to 2015, exploration activities by Gold Standard were focused in the North Railroad portion of the property. Work completed in 2015 was largely focused on the Pinion area in the South Railroad portion of the property, after its acquisition in 2014. A thorough discussion of these work programs and their results and interpretations is available in previous technical reports on the property.

Exploration work by Gold Standard since 2010 resulted in the identification of 17 prospect areas or zones of mineralization within the overall property position, including the Bald Mountain area and North Bullion deposits in the North Railroad-Pinion portion of the property, the Pinion, Dark Star, and Jasperoid Wash deposits, and other areas of the South Railroad portion of the property. Drilling conducted by Gold Standard is summarized below and in Section 10 of the South Railroad Report.

DRILLING

On October 4, 2021, MDA/RESPEC received a summary of all drilling conducted within the property during 2018 through 2021 from Gold Standard. This data was used to update the property-wide drilling information summarized in the 2020 technical report for the property (Ibrado et al. (2020)). In total, there are records from a total of 1,453,656 ft drilled in 2,205 holes since drilling commenced in 1969. These totals exclude two holes for which MDA/RESPEC has collar locations, but no depths drilled, hole type, company or assays. Twenty-one different historical operators are known to have drilled 1,084 holes, for a total of 500,544 ft, from 1969 through 2008. As of September 21, 2021, Gold Standard had drilled 1,121 holes for a total of 953,112 ft, as set forth in the table below. This includes 16 holes for 12,140 ft drilled in the Pinion area after the June 2, 2021 effective date of the Pinion resource database; five holes for 1,220 ft drilled in the Dark Star area after the June 15, 2021 effective date of the Dark Star resource database; and 38 holes for 12,409 ft drilled in the North Bullion area after the August 21, 2020 effective date of the North Bullion resource database. The drilling was done using Imperial units of measure.

Approximately 81% of the holes have records to indicate they were drilled with RC methods. There is a total of 33,357 ft drilled in 88 historical holes for which MDA/RESPEC had no reliable information on the type of hole or drilling methods used. The authors of the South Railroad Report believed the amount of RC drilling may be understated because the historical holes with no hole-type attribute were drilled in the late 1980s and 1990s when RC drilling was common.

All Railroad-Pinion Drilling 1969 – 2021

    

    

    

    

    

RC + 

    

RC + 

    

    

    

    

Rotary 

Rotary 

Core Tail 

Core Tail

Unknown

Unknown 

Period

& RC Holes

& RC (ft)

Core Holes

Core (ft)

Holes

 (ft)

 Type Holes

Type (ft)

Total Holes

Total (ft)

Historical Drilling 1969 - 2008

938

432,591

58

34,595

88

33,357

1,084

500,544

Gold Standard 2010 - 2021

847

667,707

233

217,607

41

67,798

1,121

953,112

Totals

 

1,785

 

1,100,298

 

291

 

252,202

 

41

 

67,798

 

88

 

33,357

 

2,205

 

1,453,656

See Section 10 of the South Railroad Report for additional information on drilling conducted at the Railroad-Pinion property and “Outlook and Future Plans” below for information on drilling activities completed by Gold Standard and Orla subsequent to the effective date of the South Railroad Report.

Page 41


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2023

United States dollars unless otherwise stated

SAMPLING, ANALYSIS AND DATA VERIFICATION

Sampling and Analysis – North Railroad

Commencing in 2010, drilling company employees collected Gold Standard’s RC samples at the rig. Those samples were then picked up at the drill sites by representatives of ALS Minerals (“ALS”) or Inspectorate America Corporation (“Inspectorate”), a division of Bureau Veritas Mineral Laboratories USA (“Bureau Veritas”) and transported by truck to their respective laboratories in either Elko or Reno, Nevada (for ALS), or Elko (for Bureau Veritas). Excessively wet samples were kept at the drill sites for a few days to drain and dry prior to collection by the laboratory staff.

ALS and Bureau Veritas were commercial laboratories independent of Gold Standard. ALS is accredited through the International Organization for Standardization/International Electrotechnical Commission (“ISO/IEC”) 17025:2005 for specific analytical procedures, while most of their laboratories have attained ISO 9001:2008 certification. Bureau Veritas’ laboratories in Sparks, Nevada is accredited to the standard ISO/IEC 17025:2017, RG- MINERAL:2017. The Bureau Veritas laboratory in Vancouver, British Columbia is accredited to the standard ISO/IEC 17025:2005 and ISO 9001:2008.

Core samples were transported daily from the drill sites to Gold Standard’s logging and core-cutting facility in Elko by Gold Standard personnel. After logging and marking core-sample intervals by Gold Standard geologists, the core was photographed prior to being sawed lengthwise by contractor technicians. Whole HQ-size core was sawed in half. Whole PQ-size core was sawed in quarters. One half of the HQ core, and three quarters of the PQ core, were returned to the core boxes and the remainder was placed in pre-numbered sample bags that were closed with ties. Following insertion of QA/QC blanks and certified reference materials (“CRMs”), the core samples were transported by representatives of ALS or Bureau Veritas to their respective laboratories for preparation and analysis.

Samples from Gold Standard’s RC and core drilling at North Bullion in 2010 through 2014, and at Bald Mountain in 2014, were prepared at the ALS laboratories in Elko and Reno, Nevada. The samples were dried and crushed in their entirety to 70% at less than 0.079 in. The crushed samples were riffle-split to obtain 8.82 oz subsamples that were pulverized to 85% less than 75 microns. The pulps were shipped by air freight by ALS to the ALS laboratory in North Vancouver, British Columbia, for analysis. Gold was determined by 30 g fire-assay fusion with an AA finish (method code Au-AA23). Samples assayed at ≥0.292 oz Au/ton were re-analyzed with a second 30 g aliquot by fire-assay fusion and gravimetric finish (method code Au-GRA21). Separate aliquots of 0.5 g were analyzed for silver and 34 major, minor and trace elements by ICP following an aqua regia digestion. In some cases, the ICP analyses were conducted on pulps from 5.0 ft drill samples. In other cases, ICP analyses were conducted on composited pulps representing 20 ft drill intervals. Samples that assayed >292 oz/t for silver or zinc by ICP were re-analyzed using AA following aqua regia digestion of 0.1 g aliquots.

A minority of the 2010 through 2012 drill samples were analyzed by SGS Canada Inc. (“SGS”) of Vancouver, British Columbia. The assay certificates do not indicate how or where the samples were prepared for analysis. At the SGS laboratory in Burnaby, British Columbia, gold was determined by 30 g fire-assay fusion with an AA finish and separate aliquots were analyzed by ICP for 35 major, minor, and trace elements. SGS was a commercial laboratory independent of Gold Standard. MDA is not aware of certifications held by SGS at that time.

In 2013, pulps from previously prepared samples from North Bullion were analyzed by Bureau Veritas in Sparks, Nevada. Gold was determined by 30 g fire-assay fusion with an AA finish. Some of the samples were analyzed using a 30 g aliquot by fire-assay fusion and gravimetric finish. In 2014, some of the Bald Mountain drill sample pulps were re-analyzed at Bureau Veritas’ laboratory in Vancouver, British Columbia for copper by cyanide-H2SO4 leach. Other pulps were analyzed for 45 major, minor and trace elements by a combination of ICP and mass spectrometry (“ICP-MS”) after 4-acid digestion.

Page 42


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2023

United States dollars unless otherwise stated

Samples from the 2015, 2016, and 2017 drilling at North Bullion and Bald Mountain were analyzed at ALS and Bureau Veritas. At ALS the methods and procedures of preparation were the same as those used in 2010 through 2014. Gold was determined using ALS method code Au-AA23 and Au-GRA21 principally in the ALS laboratory in North Vancouver. Most gold assays on 2017 North Bullion samples were performed in the ALS laboratory in Reno with the same methods (Au-AA23; Au-GRA21). Separate aliquots of 0.5 g were analyzed for silver and 34 major, minor and trace elements by ICP following an aqua regia digestion in the North Vancouver laboratory. In some cases, these were composited pulps representing 20 ft drill intervals.

A significant portion of the samples from the 2016 North Bullion drilling, and the majority of the 2017 North Bullion samples, were prepared and analyzed by Bureau Veritas. These samples were prepared in the Bureau Veritas laboratory in Elko. After crushing, a 8.0 oz riffle-split subsample was obtained from each drill sample. These subsamples were pulverized to 200-mesh size and the pulps were shipped to the Bureau Veritas laboratory in Sparks, Nevada. Gold was determined by fire-assay fusion of 30 g aliquots with an AA finish. The pulps were shipped via air freight by Bureau Veritas to their analytical laboratory in Vancouver where they were analyzed for 45 major, minor and trace elements by ICP-MS after four-acid digestion.

Samples from Gold Standard’s 2019 North Bullion drilling were analyzed at Bureau Veritas. At total of 40 major, minor and trace elements, including gold, were analyzed by ICP following an aqua regia digestion. The 2020 North Bullion drilling samples were analyzed at ALS for gold using a 30 g aliquot by fire-assay fusion followed by an AA finish.

Sampling and Analysis – South Railroad

Commencing in 2012, Gold Standard’s RC samples stored by the drill rig were collected at the drill sites by representatives of ALS or Bureau Veritas and transported via truck to their respective laboratories in Elko, Nevada. Excessively wet samples were kept at the drill sites for a few days to drain and dry prior to collection by the laboratory staff.

Core samples were transported daily from the drill sites to Gold Standard’s logging and core cutting facility in Elko by Gold Standard personnel. After logging and marking core-sample intervals by Gold Standard geologists, the core was photographed prior to being sawed lengthwise by contractor technicians. Whole HQ-size core was sawed in half. Whole PQ-size core was sawed in quarters. One half of the HQ core, and three quarters of the PQ core, were returned to the core boxes and the remainder was placed in pre-numbered sample bags that were closed with ties. Following insertion of QA/QC blanks and CRM, the core samples were transported by representatives of ALS or Bureau Veritas to their respective laboratories for preparation and analysis.

Samples from Gold Standard’s drilling in 2012, 2014, 2015, 2016, and 2017 were analyzed by ALS. The samples were prepared at the ALS laboratory in Elko, Nevada. The samples were dried and crushed in their entirety to 70% at less than 0.079 in. The crushed samples were riffle-split to obtain 8.0 oz subsamples that were pulverized to 85% at less than 75 microns. The pulps were shipped via air freight by ALS to the ALS laboratory in North Vancouver, British Columbia, for analysis. Gold was determined by 30 g fire-assay fusion with an AA finish (method code Au-AA23). Samples assayed at ≥0.292 oz/ton were re-analyzed with a second 30 g aliquot by fire-assay fusion and gravimetric finish (method code Au-GRA21). Separate aliquots of 0.5 g were analyzed for silver and 34 major, minor and trace elements by ICP following an aqua regia digestion. In some cases, the ICP analyses were conducted on pulps from 5.0 ft drill samples. In other cases, ICP analyses were conducted on composited pulps representing 20 ft drill intervals. Some samples in 2014 were analyzed for silver by fire-assay fusion of 30 g aliquots with a gravimetric finish. In 2014, some samples were also assayed for 48 major, minor and trace elements by ICP-MS after four-acid digestions. During 2017, samples were analyzed for gold by cyanide leach with an AA finish.

Page 43


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2023

United States dollars unless otherwise stated

In 2018, Pinion area drill samples were analyzed at Bureau Veritas and AAL. At the Bureau Veritas laboratory in Sparks, Nevada, samples were crushed in their entirety and riffle-split to obtain 8.0 oz subsamples. These subsamples were pulverized to 200-mesh size. Gold was determined by 30 g fire-assay fusion with an AA finish. Some samples were analyzed for gold by cyanide leach with an AA finish. The pulps were shipped to the Bureau Veritas laboratory in Vancouver, British Columbia. Carbon, CO2, and sulfur were determined by induction-furnace infrared absorption and thermal conductivity (“LECO”) analyses of 0.1 g aliquots. Gold, silver, and 35 major, minor and trace elements were assayed by ICP following aqua regia digestion of 0.5 g aliquots. Additional silver assays were completed in 2019 at Bureau Veritas using drill-sample pulps from previous analyses. Silver was determined by AA following four-acid digestion of 1.0 g aliquots.

At AAL in Sparks, Nevada, composited pulps of 2018 Pinion area drill samples were analyzed for gold by 30 g fire-assay fusion with an AA finish, and in some cases, with a gravimetric finish. Some of the samples were analyzed for gold by cyanide leach and an AA finish. Gold, silver, and 49 major, minor and trace elements were determined in some samples by ICP-MS following digestion in aqua regia.

AAL also analyzed selected, previously assayed drill-sample pulps for elemental barium using an energy-dispersive, x-ray fluorescence (“XRF-ED”) procedure. Pressed-powder pellets made from 2.0 g aliquots of sample pulps were used for the XRF-ED analyses, which were performed in 2018 and 2019. Other selected sample pulps were analyzed for barium using XRF-ED with 2.0 g pressed-powder pellets. Some of these were also analyzed for barite using wave-length dispersive x-ray fluorescence (“XRF-WD”) following lithium metaborate fusion of 0.5 g aliquots. Other sample pulps were analyzed for elemental barium by NITON hand-held XRF on both loose-powder aliquots. These were also analyzed by x-ray diffraction (“XRD”) for barite, witherite, and calcite, as well as sulfur and carbon by induction-furnace infrared (LECO).

Gold Standard also performed assays of elemental barium together with 39 major, minor, and trace elements using hand-held NITON XRF analyzers. These assays were done in 2018 in Elko, Nevada by independent contractor Rangefront Geological using selected drill-sample pulps in loose powder form.

In 2019, the Pinion drilling samples were analyzed at Bureau Veritas. Gold was determined by ICP following an aqua regia digestion and by cyanide leach followed by an AA finish. Silver was analyzed by AA following a 4-acid digestion and by ICP following an aqua regia digestion. Thirty-seven major, minor and trace elements were analyzed by ICP following an aqua regia digestion. Carbon species, sulfur species and CO2 were determined by LECO methods.

The 2020 drilling samples from Pinion were analyzed at Paragon Geochemical (“Paragon”). Paragon is an independent commercial analytical laboratory in Sparks, Nevada with ISO/IEC 17025 certification. Thirty-four major, minor and trace elements were analyzed by ICP following an aqua regia digestion. Some of the samples were analyzed by ICP following a 4-acid digestion. Silver was analyzed by AA and by ICP following a 4-acid digestion. Gold was determined using a 30 g fire-assay fusion with an ICP finish. Gold was also analyzed by cyanide leach of a 30 g aliquot with an AA finish.

In 2021, Pinion drilling samples were analyzed at AAL, Bureau Veritas and Paragon. The same methods of analysis used at each of these three laboratories in prior years were also used for the 2021 drilling samples. Gold Standard obtained XRF barium assays in-house using NITON and Olympus units, and through AAL and Paragon Laboratories.

Gold Standard’s 2015 drilling samples from the Dark Star area were mostly analyzed by Bureau Veritas after preparation in the Bureau Veritas laboratory in Elko, Nevada. The samples were crushed in their entirety and riffle-split to obtain 8.0 oz subsample. These subsamples were pulverized to 200-mesh size. Gold was determined by 30 g fire-assay fusion with an AA finish in Bureau Veritas’ laboratory in Sparks, Nevada. Composited pulps were analyzed in Bureau Veritas’ laboratory in Vancouver, British Columbia, for gold, silver and 35 major, minor and trace elements by ICP-MS following aqua regia digestion of 0.5 g aliquots. Some of the 2015 pulps were re-analyzed by ALS in in North Vancouver, British Columbia, for gold by 30 g fire-assay fusion with an AA finish.

Page 44


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2023

United States dollars unless otherwise stated

The 2016 and 2017 drilling samples from the Dark Star area were analyzed in part by Bureau Veritas and in part by ALS, with sample preparation in their respective laboratories in Elko, Nevada, using the same procedures that were used for the Pinion area samples as summarized above. The ALS assays were carried out in their Reno and North Vancouver laboratories where gold was determined by 30 g fire-assay fusion with an AA finish. Samples with ≥0.292 oz Au/ton were re-analyzed with a second 30 g aliquot by fire-assay fusion and gravimetric finish. Silver and 34 major, minor, and trace elements were assayed by ICP following aqua regia digestion of 0.5 g aliquots.

The Bureau Veritas assays of the 2016 and 2017 Dark Star drilling samples were performed in Bureau Veritas’ laboratories in Sparks, Nevada, and Vancouver, British Columbia. Gold was determined by fire-assay fusion of 30 g aliquots with an AA finish and in some cases with a gravimetric finish. Some samples were analyzed for gold by cyanide leach and an AA finish, and some samples were analyzed for gold with a screen-fire assay procedure. Gold, silver, and 35 major, minor, and trace elements were assayed in the Vancouver laboratory by ICP-MS following aqua regia digestion of 0.5 g aliquots.

The 2018 and 2019 drilling samples from the Dark Star area were prepared in either Bureau Veritas’ Elko or Sparks, Nevada, laboratories and analyzed in their Sparks and Vancouver laboratories. Gold and multi-element assays were carried out with the same methods and procedures used for the 2016-2017 samples. In addition, some samples were analyzed for carbon species, sulfur species, and CO2 by LECO methods.

Bureau Veritas was the principal laboratory for the analysis of the 2020 and 2021 Dark Star drilling samples. Silver was analyzed by AA following a 4-acid digestion, as well as by ICP following an aqua regia digestion. Gold was determined using a 30 g fire-assay fusion with an AA finish. Gold was also analyzed using a 30 g cyanide leach with an AA finish. Thirty-seven major, minor and trace elements, including gold and silver, were analyzed by ICP following an aqua regia digestion. Carbon species, sulfur species and CO2 were determined with LECO methods.

ALS analyzed some of the 2020 Dark Star samples for gold using a 30 g fire-assay fusion with an AA finish, as well as a 30 g cyanide leach with an AA finish. Samples that assayed ≥0.292 oz Au/ton were re-analyzed with a second 30 g aliquot by fire-assay fusion and gravimetric finish.

AAL analyzed gold in some of the 2021 Dark Star drilling samples using a 30 g cyanide leach with an AA finish. Samples were also analyzed for gold using a 30 g fire-assay fusion followed by an ICP finish. Samples that assayed ≥0.292 oz Au/ton were re-analyzed with a second 30 g aliquot by fire-assay fusion and gravimetric finish.

The 2017 drilling samples from the Jasperoid Wash area were analyzed in part by Bureau Veritas and in part by ALS following preparation at their respective laboratories in Elko, Nevada. Gold and multi-element analyses were performed at their respective laboratories in Sparks, Nevada, Vancouver and North Vancouver, British Columbia, using the same methods and procedures used for the 2016-2018 Dark Star samples as summarized above.

All of the 2018 drill samples from Jasperoid Wash were prepared and analyzed by Bureau Veritas in Sparks, Nevada and Vancouver, British Columbia, using the same methods and procedures used for the 2016-2019 Dark Star samples as summarized above.

The 2019 drill samples from Jasperoid Wash were analyzed at Bureau Veritas. Thirty-seven major, minor and trace element, including gold and silver, were analyzed by ICP following an aqua regia digestion. Gold was also analyzed by cyanide leach. Carbon species, sulfur species and CO2 were determined with LECO methods. In 2020, some of the earlier Jasperoid Wash drilling samples were analyzed for silver using AA following a 4-acid digestion.

Page 45


Table of Contents

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2023

United States dollars unless otherwise stated

Gold Standard’s 2017 and 2018 drilling samples from the Dixie area were prepared by Bureau Veritas in Sparks, Nevada and Elko, Nevada. Analyses were conducted in the Bureau Veritas Sparks and Vancouver laboratories. Gold was determined by fire-assay fusion of 30 g aliquots with an AA finish. Some samples were analyzed for gold by cyanide leach and an AA finish. Gold, silver and 35 major, minor and trace elements were assayed in the Vancouver laboratory by ICP-MS following aqua regia digestion of 0.5 g aliquots. Composited pulps from the 2018 drilling were analyzed for carbon species, sulfur species and CO2 by LECO methods in the Vancouver laboratory.

Most RC samples from Gold Standard’s 2018 drilling at the Ski Track area were prepared by Bureau Veritas in Sparks, Nevada and Elko, Nevada. Analyses were conducted in the Bureau Veritas Sparks and Vancouver laboratories. Gold was determined by fire-assay fusion of 30 g aliquots with an AA finish. Some samples were analyzed for gold by cyanide leach and an AA finish. Gold, silver, and 35 major, minor and trace elements were assayed in the Vancouver laboratory by ICP-MS following aqua regia digestion of 0.5 g aliquots. Composited pulps from the 2018 drilling were analyzed for carbon species, sulfur species, and CO2 by LECO methods in the Vancouver laboratory.

For additional information on the specific assaying and analytical procedures used by historic operators of the property prior to Gold Standard, see Section 11 of the South Railroad Report.

Data Verification

Mr. Lindholm is satisfied that the Pinion, Dark Star, Jasperoid Wash, and North Bullion drilling databases are in good condition. Various audits and checks were performed by MDA to verify collar coordinates, down-hole deviation surveys, geology, and assay data in the drill-hole database. All Gold Standard gold assay data was verified using digital laboratory certificates. However, about one third of the Pinion assays and one quarter of the Dark Star assays from historical drill campaigns were unsupported with original assay certificates. The same is true at North Bullion, where Gold Standard drilling makes up only 28% of the database, almost all of which is in the North Bullion deposit. The drill-hole data at the POD, Sweet Hollow and South Lodes deposits is almost entirely historical. Drill-hole data lacking adequate supporting documentation, as well as data from holes observed during sectional modeling to be inconsistent with surrounding holes, were treated as lower confidence, or excluded from use in modeling and estimation.

In 2019, Gold Standard supplemented their Pinion silver database with re-assayed individual samples for which composites of multiple intervals had previously been analyzed. Over 50% of the original certificates were available for all silver data and were used for verification. QA/QC data was also evaluated, and the silver data was deemed acceptable for use in estimation of classified Mineral Resources.

There is no evidence of significant historical QA/QC programs for drilling prior to 2014. For Gold Standard programs at Dark Star, Pinion, and Jasperoid Wash, the QA/QC program was minimal in 2014 through 2016 but was more comprehensive in 2017 to 2020. Similarly at North Bullion, over the full-time span of the Gold Standard drilling from 2010 to 2012 there is a reasonable implementation of QA/QC protocols, but during some periods of time it is less substantial. The results and amount of QA/QC data, as well as non-remedied QA/QC “failures,” were considered in Mineral Resource classification for the Dark Star, Pinion, Jasperoid Wash and North Bullion deposits. Mr. Lindholm concludes that the Dark Star, Pinion, and Jasperoid Wash analytical data are adequate for the purposes used in the South Railroad Report, subject to issues described in Section 12 of the South Railroad Report. The issues described in Section 12 of the South Railroad Report were considered in assigning levels of confidence and the classification of the Mineral Resources.

Cyanide-soluble gold assays at Dark Star and Pinion were verified, but no QA/QC data was available for evaluation. Carbon and sulfur species data were audited and determined to be adequate for use in their respective estimates done for waste handling and metallurgical characterization. No QA/QC data was associated with the carbon and sulfur analyses.