EX-99.85 86 tm2034111d1_ex99-85.htm EXHIBIT 99.85

 

Exhibit 99.85

 

 

 

Management’s Discussion and Analysis

 

Year ended December 31, 2018

 

 

 

ORLA MINING LTD.

Management’s Discussion and Analysis

Year ended December 31, 2018 Canadian dollars unless otherwise stated

 

1.Overview

 

Orla Mining Ltd. is a mineral exploration and development company which, effective November 1, 2018, trades on the Toronto Stock Exchange under the ticker symbol OLA. Prior to November 1, 2018, it traded on the TSX Venture Exchange under the same ticker symbol. The “Company”, “Orla”, “we”, and “our” refer to Orla Mining Ltd. and its subsidiaries. Refer to page 24 of this document for a list of abbreviations used.

 

Our corporate strategy is to acquire and develop mineral exploration properties where our expertise can substantially increase shareholder value. We have two material gold projects with near-term production potential based on open pit mining and heap leaching – the Camino Rojo gold and silver project in Zacatecas State, Mexico, and the Cerro Quema gold project in Panama.

 

You should read this Management’s Discussion and Analysis (“MD&A”) of the financial condition and results of operations of the Company in conjunction with our audited consolidated financial statements for the year ended December 31, 2018 (the “financial statements”), which were prepared in accordance with International Financial Reporting Standards (“IFRS”). You can find additional information regarding the Company, including our Annual Information Form, on SEDAR under the Company’s profile at www.sedar.com.

 

All monetary amounts herein are expressed in Canadian dollars unless otherwise stated.

 

This MD&A is current as of March 18, 2019.

 

Hans Smit, P. Geo, our Chief Operating Officer, is the Qualified Person, as the term is defined in National Instrument 43-101 (“NI 43-101”). He has reviewed and approved the technical information disclosed in this MD&A.

 

With respect to the preliminary economic assessment (“PEA”) on the Camino Rojo project, readers are cautioned that PEAs are preliminary in nature and include the use of inferred mineral resources, which are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that preliminary economic assessment results will be realized. Mineral resources are not mineral reserves and do not have demonstrated economic viability.

 

2.Highlights

 

During the year ended December 31, 2018 and to the date of this MD&A, the Company:

 

·completed and filed a Preliminary Economic Assessment (“PEA”) Technical Report in respect of the Camino Rojo Project,

·reported additional drill intercepts from the Caballito Copper-Gold Zone at the Cerro Quema Project,

·reported positive metallurgical test results on oxide material from the Cerro Quema Project,

·appointed a new Chief Financial Officer, a new Corporate Secretary, a new President and Chief Executive Officer,

·commenced trading on the Toronto Stock Exchange,

·entered into option agreements to acquire the Monitor Gold project in Nevada, and

·filed a final short form base shelf prospectus for offerings of up to $300 million.

 

Page 2

 

 

ORLA MINING LTD.

Management’s Discussion and Analysis

Year ended December 31, 2018   Canadian dollars unless otherwise stated

 

3.Discussion of Operations

 

A.Camino Rojo, Mexico

 

Project Description and History

 

The Camino Rojo Project lies 190 km NE of the city of Zacatecas, 48 km S-SW of the town of Concepcion del Oro, and 54 km S-SE of Goldcorp Inc.’s (“Goldcorp”) Peñasquito Mine and consists of eight concessions covering in aggregate 205,936 hectares. On November 7, 2017, we acquired the Camino Rojo Project from Goldcorp. As currently understood, Camino Rojo is comprised of a near-surface oxide gold and silver deposit, a deeper sulphide zone containing gold, silver, zinc and lead mineralization, and a large area with exploration potential.

 

Canplats Resources Corporation (“Canplats”) initially discovered gold-silver mineralization at Camino Rojo in 2007, and they subsequently completed 39,725 metres of drilling, largely delineating the shallow oxide mineralization. Canplats also carried out metallurgical studies prior to being acquired by Goldcorp in 2010. Goldcorp then completed more than 250,000 metres of drilling, conducted airborne and ground geophysical surveys, did extensive geological and mineralogical investigations, and conducted numerous metallurgical studies, which included detailed mineralogical studies, column leach tests on oxide material, size fraction analysis, variability test work and sulphide flotation studies.

 

The Ejido San Tiburcio holds the surface rights over the main area of known mineralization. Exploration has been carried out under the authority of agreements between the project operators and the Ejido San Tiburcio. There is a temporary occupation agreement in place with the Ejido San Tiburcio, with the right to expropriate, covering all the area of the mineral resource and area of potential development described in the Camino Rojo Report. The Company has water rights in the project area.

 

The Company has full rights to explore, evaluate, and exploit the property. However, if sulphide projects are defined through one or more positive pre-feasibility studies with certain development scenarios meeting certain criteria, Goldcorp has an option to enter into a joint venture with Orla for the purpose of future exploration, advancement, construction, and exploitation of such a sulphide project. If Goldcorp exercises its option, Orla’s share of the costs to develop the project might be carried to production by Goldcorp. Orla has a right of first refusal on a sale if Goldcorp elects to sell its portion of the sulphide project, in whole or in part. The Camino Rojo Asset Purchase Agreement was filed on SEDAR on June 28, 2017. Details of the development scenarios and joint venture structures are available in our news release dated November 7, 2017, which is available here.

 

2018 Activities and Future Plans

 

Immediately upon acquiring the Camino Rojo project in November 2017, the Company started refurbishing the camp, and also commenced a Community and Social Responsibility program. We relogged a portion of the core holes by the end of 2017 as part of creating a new geological model for the property, which formed the basis for the mineral resource estimate completed in April 2018.

 

Starting in early 2018, we conducted exploration work to evaluate previously identified targets and to develop new targets for gold and silver mineralization on our large land position. In March 2018, we started environmental baseline and assessment activities required for permitting, as well as the evaluation of flow rates from four previously established water wells.

 

Page 3

 

 

ORLA MINING LTD.

Management’s Discussion and Analysis

Year ended December 31, 2018   Canadian dollars unless otherwise stated

 

In May 2018, we announced a Mineral Resource estimate for the Camino Rojo deposit and the results of a PEA for the development of an open pit project with heap leaching process to recover the gold and silver mineralization, both prepared in accordance with National Instrument 43-101.

 

Summary of the Mineral Resource at Camino Rojo:

 

M&I Resource  K tonnes   Au (g/t)   Ag (g/t)   Au (Koz)   Ag (Koz) 
Leach – Oxide/Trans   100,839    0.734    12.67    2,381    41,091 
Mill – Sulphide   254,069    0.889    7.50    7,265    61,286 
Total M&I   354,908    0.845    8.97    9,646    102,377 
Total Inferred   65,200    0.867    7.73    1,817    16,208 

 

M&I Resource  K tonnes   Lead (%)   Zinc (%)   Lead (Mlbs)   Zinc (Mlbs) 
Leach – Oxide/Trans   100,389    0.21    0.37    455.8    814.8 
Mill – Sulphide   254,069    0.07    0.26    402    1,458.3 
Total M&I   354,908    0.11    0.29    875.8    2,273.2 
Total Inferred   65,200    0.05    0.23    75.2    336.8 

 

Notes:

 

(1)The mineral resource is effective as of April 27, 2018.

(2)Columns may not sum exactly due to rounding.

(3)Mineral resources that are not mineral reserves do not have demonstrated economic viability.

(4)Mineral resources for leach material are based on prices of $1400/oz gold and $20/oz silver.

(5)Mineral resources for mill material are based on prices of $1400/oz gold, $20/oz silver, $1.05/lb lead, and $1.25/lb zinc.

(6)Mineral resources are based on NSR cut-off grades of $5.06/t for leach material and $13.72/t for mill material.

(7)The mineral resource estimate assumes that the floating pit cone used to demonstrate reasonable prospects for eventual economic extraction extends onto land held by the owner of the adjacent property. Any potential development of the Camino Rojo Project that includes an open pit encompassing the entire mineral resource estimate would be dependent on obtaining an agreement with the owner of the adjacent property.

 

Page 4

 

 

ORLA MINING LTD.

Management’s Discussion and Analysis

Year ended December 31, 2018   Canadian dollars unless otherwise stated

 

On July 12, 2018, we filed the preliminary economic assessment of the Camino Rojo Project. The PEA was based on near-surface oxide and partly oxidized (transitional) material within the overall mineral resource that can be processed by heap leaching. All mineral resources and the proposed open pit are within our mineral concessions.

 

Highlights of the PEA were as follows:

 

Production rate  18,000 tonnes
Life of mine  6.6 years
Total material to the leach pad  42.5 million tonnes
Average grade – gold and silver  0.71 g/t gold, and 13.56 g/t silver
Contained ounces  966,000 oz gold, and 18,517,000 oz silver
Average recovery  67% gold, and 15% silver
Average annual gold production  97,500 ounces
Strip ratio  0.58
Initial capex  US$125 million
Average life of mine production costs  US$8.02 per tonne processed
Total By-Product Cash Cost1  US$499/oz Au
All-In Sustaining Cost1  US$555/oz Au
Pre-tax Net Present Value (“NPV”) (using 5% discount rate)  US$231 million
Pre-tax Internal Rate of Return (“IRR”)  38.1%
After-tax NPV (using 5% discount rate)  US$121 million
After-tax IRR  24.5%
Payback period  3.3 years
Metal price assumptions  US$1,250/oz gold and US$17/oz silver

 

Further details can be found in the 43-101 Technical Report filed on SEDAR on July 12, 2018, which is also available here.

 

Key opportunities for the Camino Rojo project include:

 

·If an agreement can be reached with the owner of the adjoining claim, there would be an increase in the amount of material that could potentially be mined and processed.

 

·Steepening of the north wall of the proposed pit would result in an increase in material that could potentially be mined and processed.

 

Risks for the Camino Rojo project include:

 

·Predicted metallurgical results in the Camino Rojo PEA are based on significant historical test work. However, there is very limited direct test work on coarse crushed material considered in the PEA. Due to the lack of confirmatory test work, there is a risk that the recovery estimates may be somewhat overstated. Confirmatory test work is currently being undertaken.

 

·Carbonaceous material with preg-robbing characteristics has been identified, which may reduce overall heap performance and metal recovery if processed in the latter part of the project.

 

·Additional studies on the proposed power line to site, including approval from the Mexican CFE, are required to confirm the proposed power line is feasible. Based on the results of these studies, an alternative power supply method may be required for part or all of the project, which may increase project costs.

 

 

 

1 Includes royalties payable

 

Page 5

 

 

ORLA MINING LTD.

Management’s Discussion and Analysis

Year ended December 31, 2018   Canadian dollars unless otherwise stated

 

Following the completion of the PEA, we commenced feasibility work during the second half of 2018. We anticipate completion of this work in mid-2019. We completed a 14-hole diamond drill program to acquire material for additional column-leach metallurgical testing adding to the 88 column tests completed by previous owners. Column-leach tests conducted to determine optimum crush size and for feasibility level gold and silver recovery estimates are now complete and final column recoveries are being determined.

 

We drilled 13 reverse-circulation holes in areas where the Company has surface rights to explore for groundwater in the second half of 2018. The best results were in a hole that intersected limestone approximately 5 km north of the proposed development. We are currently constructing a well at this location.

 

Excavator trenching and shallow drilling to support geotechnical studies under the proposed infrastructure was undertaken in mid to late 2018. No significant issues were detected. Three core holes were drilled for geotechnical analysis of the north wall of the proposed pit. This analysis is still underway.

 

Exploration work to evaluate previously identified targets and develop new targets for gold and silver mineralization on our 205,936 ha land position started in early 2018. As mineralization previously discovered on the property demonstrates, shallow cover can mask extensive near-surface mineralization. We completed a 100 line-km Induced Polarization (“IP”) survey with 400 metre spaced lines in the spring of 2018 over the known deposit, areas of potential development, and an adjoining area to the west. Results showed a low but distinctive chargeability anomaly at depth in the area of the current deposit. A similar anomaly at depth to the west of the resource will be tested by drilling in 2019.

 

A new IP survey to the southeast of the resource and proposed development area was started in January 2019. This 120 line-km survey will test the projection of the San Tiburcio fault, a structure considered important to the emplacement of the known mineralization.

 

Environmental assessment required for permitting is ongoing with a planned completion in June 2019.

 

B.Cerro Quema Project, Panama

 

Project Description and History

 

Our 100%-owned Cerro Quema Project is located on the Azuero Peninsula in Los Santos Province, in south western Panama, about 45 kilometres southwest of the city of Chitre and about 190 kilometres southwest of Panama City. The project is at the exploration and development stage for a proposed open-pit mine with process by heap leaching. We own the mineral rights as well as the surface rights over the areas of the current mineral resources and mineral reserves, proposed mine development and the priority drill targets.

 

Mineral concessions are comprised of three contracts between the Republic of Panama and Minera Cerro Quema S.A., a wholly owned subsidiary of Orla. The original 20-year term for these concessions expired on February 26, 2017 (Contracts 19 and 20) and March 3, 2017 (Contract 21). The Company has applied for the prescribed 10-year extension to these contracts as it is entitled to under Panamanian mineral law. On March 6, 2017, the Ministry of Commerce and Industry provided written confirmation to the Company that the extension applications were received, and that exploration work could continue while the Company waits for the renewal. We have received verbal assurances from government officials that the renewal applications are complete with no outstanding legal issues. On April 26, 2017, the Company received authorization from the Ministry of Environment to drill in two areas outside of the existing permitted drill area. On June 28, 2017, the Company received a permit to use water for drilling. A permit was received on May 8, 2018 to drill in the Sombrero zone and on May 11, 2018, we received two permits to use water for drilling. An existing permit that allows drilling in the areas of the current mineral resources was extended for two years in May 2018. In October 2018, the government accepted our 2018 concession tax payments, and in February 2019, we paid the 2019 concession tax payments. A new drilling permit for the Pelona area in the eastern part of the concessions was received very recently on February 11, 2019.

 

Page 6

 

 

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2018 

Canadian dollars unless otherwise stated

 

The Company owns the surface rights for land required to mine the Cerro Quema mineral reserves and to construct and operate a heap leach facility, and part of the land required for proposed upgrades to the project access road.

 

A predecessor company to Orla issued a mineral resource estimate and a Pre-Feasibility Study for Cerro Quema, and an independent technical report entitled “Cerro Quema Project – Pre-Feasibility Study on the La Pava and Quemita Oxide Gold Deposits” dated August 15, 2014 with an effective date of June 30, 2014 (the “Cerro Quema Report”).

 

The Cerro Quema Report envisions a standard open pit mine with two pits, one at La Pava and one at Quemita, coupled with a 10,000 tonne per day heap leach facility to extract the gold. With an average head grade of 0.77 g/t Au and a crush size of 80% passing minus 50mm, an average gold recovery of 86% was estimated. This would result in 418,000 ounces of gold production over a 5.3-year mine life.

 

The Cerro Quema Report, which contains the 2014 mineral resource and mineral reserve estimate and Pre-Feasibility Study, was filed on SEDAR by Pershimco Resources Inc. on August 22, 2014. You can download it from SEDAR here.

 

Cerro Quema Mineral Reserves

 

Zone  Category  Cut-Off
(Au g/t)
   Tonnes (millions)   Au
(g/t)
   Au
(koz)
 
La Pava  Proven   0.21    6.82    0.80    176 
   Probable   0.21    7.40    0.67    159 
   Sub-Total   0.21    14.22    0.73    335 
Quema  Proven   0.21             
  Probable   0.21    5.49    0.86    153 
  Sub-Total   0.21    5.49    0.86    153 
Total  Proven   0.21    6.82    0.80    176 
  Probable   0.21    12.89    0.75    312 
  Total   0.21    19.71    0.77    488 

 

Notes:

(1)Numbers may not add due to rounding.

(2)A cut-off grade of 0.21 g/t of gold is used for reporting mineral reserves.

(3)Mineral reserves are estimated at a gold price of US$1,300 per ounce.

(4)Effective as of June 30, 2014.

(5)See NI 43-101 Technical Report “Cerro Quema Project – Pre-Feasibility Study on the La Pava and Quemita Oxide Gold Deposits” published on August 15, 2014 for additional information. A copy of the report is available on the Company’s website and under the SEDAR profile of Pershimco Resources Inc. at www.sedar.com.

 

2018 Exploration and Development Activities, and Future Plans

 

During 2018, we conducted drilling at Cerro Quema with one rig in operation. The Company drilled 7,536 metres in 27 holes during 2018. This work focused on the Caballito copper-gold discovery, and the Sombrero zone which is adjacent to the north of Caballito.

 

The Caballito zone is defined by a 650 to 800-metre-long northwest-southeast trending chargeability anomaly outlined by a 2017 IP survey. It is 350 to 400 metres wide. Highest grade mineralization occurs on the southwest side of the zone and is associated with very low resistivity within the overall chargeability due to very high sulphide content. Widths in excess of 100 metres grading better than 1% copper and associated 0.2 to 0.4 grams per tonne gold have been reported.

 

Page 7

 

 

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2018 

Canadian dollars unless otherwise stated

 

In 2018, we re-examined core from sulphide intercepts below the Quemita oxide gold mineral reserve located 1.2 km to the northwest of Caballito and found indications of Caballito style copper-gold mineralization with low arsenic. Therefore we extended the IP grid northward from the area surveyed in 2017 through this area and completed 25 line-km of new surveying in 2018. Results from the new IP indicated areas with potential for similar mineralization as found at Caballito. Six holes drilled north of Caballito in Sombrero intersected variable zones of alteration, but no high-grade mineralization. Further drilling is planned.

 

We completed column testing on material at larger sizes than previously tested. Gold recoveries on material crushed to 150 millimetres were 96% for the La Pava deposit, which contains approximately two thirds of the current mineral reserves, and 91% for the Quemita deposit. Operational recovery estimates are typically de-rated from column test data, but these results compare very favorably to an average operational recovery of 86% in the 2014 Pre-Feasibility Study at a crush size of -70 millimetres. We will incorporate the results into an updated process plan and operational recovery estimates that will consider one-stage crushing or run of mine instead of the two-stage crushing modelled in the 2014 PFS.

 

The Company has an ongoing environmental management plan that includes installing and maintaining sediment dams, reforestation of previously disturbed areas and active sediment control activities. Baseline surface water quality sampling and groundwater level measurements are also ongoing.

 

The Company has an active community relations program that includes providing hot lunches to 5 to 15-year-old children studying in the 12 schools located within a 15 kilometre radius of the Project. We also provide support for various local amateur sports teams, a youth orchestra, local fairs, and cultural events.

 

Future Plans

 

The metallurgical test work conducted during 2018 is part of the Company's effort to update the 2014 PFS. We expect to complete the update of the 2014 PFS, including new mineral reserve and mineral resource estimates, in the first half of 2020. In addition to the work on oxide mineralization, we will continue to advance exploration of the Caballito copper-gold sulphide discovery. This style of mineralization, identified late last year, presents potential value to the project in addition to the current heap-leach oxide gold project. In addition to the 1.2 km long trend north of Caballito through to Quemita, the Pelona area in the eastern part of the project provides extensive target area for additional Caballito-style mineralization.

 

C.            Monitor Gold Project, Nevada

 

Option Agreements

 

The Monitor Gold Project is a grassroots project in an area where work by past operators showed extensive areas with samples anomalous in gold and other metals associated with alteration, including silicification, within carbonate rocks. Stratigraphic assemblages known to host mineral deposits elsewhere in Nevada are found in the area and there are a number of major structures which could provide conduits for mineralizing fluids. Work in 2018 included mapping, rock and soil sampling and a small gravity survey.

 

On January 24, 2018, we entered into an option agreement with Mountain Gold Claims LLC to acquire up to a 100% interest in 392 claims covering approximately 3,173 hectares. These claims are subject to a 3% net smelter returns royalty on specified minerals produced from these claims. We have the right to acquire, at any time, the first third of the royalty for US$1,000,000 and a second third for US$4,000,000. The agreement grants a 1% net smelter returns royalty to Mountain Gold Claims LLC on any claims owned by third parties that are acquired by the Company within a defined Area of Interest around the claims acquired under this agreement. We have the right to acquire one half of this royalty for US$4,000,000.

 

On March 21, 2018, we entered into an option agreement with King Solomon Gold LLC to acquire up to a 100% interest in 26 claims covering approximately 210 hectares. These claims are subject to a 2% net smelter returns royalty on specified minerals produced from these claims. We have the right to acquire, at any time, the first half of the royalty for US$1,000,000 and the second half for US$2,000,000.

 

Page 8

 

 

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2018 

Canadian dollars unless otherwise stated

 

On March 22, 2018, we entered into an option agreement with a subsidiary of Ely Gold Royalties Inc. to acquire up to a 100% interest in four claims covering approximately 32 hectares. These claims are subject to a 2.5% net smelter returns royalty on specified minerals produced from these claims. We have the right to acquire, at any time, 40% of the 2.5% royalty (ie, a 1% royalty, leaving a 1.5% royalty) for US$1,000,000.

 

To maintain the options, the following payments and work commitments are required:

 

   Mountain Gold Claims LLC   King Solomon Gold LLC   Ely Gold Royalties 
Year  Share
issuances
   Advance
royalty
payments
   Annual work   Advance
royalty
payments
   Annual work   Advance
royalty
payments
 
2019  US$ 50,000   US$ 10,000   US$ 25,000   US$ 5,000   US$ 5,000   US$ 5,000 
2020       20,000    50,000    10,000    25,000    10,000 
2021   150,000    30,000    75,000    15,000    50,000    15,000 
2022       40,000    100,000    20,000    75,000    20,000 
2023   250,000    50,000    100,000    25,000    100,000    25,000 
Each year 2024 to 2027       75,000    100,000    30,000    100,000    50,000 
2028       75,000    100,000    30,000    100,000    400,000 
Each year 2029 to 2038       100,000    100,000    50,000    100,000     

 

We do not currently consider Monitor Gold to be a material project to the Company.

 

Page 9

 

 

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2018 

Canadian dollars unless otherwise stated

 

4.Selected Annual Information

 

The following table is based on financial statements prepared in accordance with IFRS and are expressed in thousands of Canadian dollars.

 

   2018   2017 1   2016 1   Discussion
Exploration expense  $22,833   $12,184   $785   In 2017 substantially all our exploration spending was focused on Cerro Quema.  We acquired Camino Rojo in November 2017.  During 2018 we conducted substantial exploration activities at both Cerro Quema and Camino Rojo.
General and administrative   561    346    179   Increase is commensurate with increased activity.
Professional fees   593    297    162   Increased audit and legal fees due to multiple jurisdictions and increased complexity within the business.
Regulatory and transfer agent   278    81    48   Increased fees due to increased market capitalization.  In 2018, we commenced trading on the TSX.
Salaries and wages   1,722    1,402    370   In 2016 we had limited activity and limited staffing.  We increased our staffing upon the acquisition of Cerro Quema at the end of 2016.
Depreciation   153    9    1   Depreciation in 2016 and 2017 was included within exploration expenses.
Share based payments   3,985    3,698    707   As a result of the increased activity and staffing after 2016, the Company granted significantly more options in 2017 and 2018 than in 2016.
Interest income   (442)   (187)   (67)  Greater average cash balances on hand due to financings.
Fair value changes on the Goldcorp loan   505           In 2018, we received an interest free loan from Goldcorp related to the Camino Rojo project.  No such loan was outstanding in 2017.
Finance costs       20        
Foreign exchange   (275)   562    114   Fluctuations in the Canadian dollar.
Impairment of mineral properties       261       In 2017 we wrote off the capitalized costs of the Blue Quartz project.
Impairment of investment in common shares           970   Decrease in the value of Pershimco shares from the time of acquiring them to the closing of the transaction to acquire 100% of Pershimco.
Loss on disposal of equipment       27        
Net loss  $29,913   $18,700   $3,269    

 

 

1 Restated due to a change in accounting policy (see note 3 of the accompanying financial statements)

 

Page 10

 

 

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2018 

Canadian dollars unless otherwise stated

 

5.Summary of Quarterly Results

 

The following table is based on financial statements prepared in accordance with IFRS. The figures have been restated because of a change in accounting policy (see note 3 of the financial statements) and are expressed in thousands of Canadian dollars.

 

   2018-Q4   2018-Q3   2018-Q2   2018-Q1   2017-Q4   2017-Q3   2017-Q2   2017-Q1 
Exploration expense  $6,066   $7,056   $4,438   $5,273   $3,156   $2,804   $3,635   $2,589 
General and administrative   183    144    126    108    88    82    70    106 
Professional fees   176    79    202    136    46    43    90    118 
Regulatory and transfer agent   205    19    14    40    1    6    26    48 
Salaries and wages   836    422    230    234    813    210    177    202 
Depreciation   40    40    37    36    3    2    2    2 
Share based payments   1,065    601    1,523    796    812    822    2,064     
Interest income   (105)   (134)   (117)   (86)   (35)   (50)   (51)   (51)
Fair value changes   187    153    100    65    8    3    5    4 
Foreign exchange   (133)   10    (146)   (6)   (258)   472    248    100 
Impairment common shares                   27             
Impairment mineral properties                   261             
Net loss  $8,520   $8,390   $6,407   $6,596   $4,922   $4,394   $6,266   $3,118 
                                         
Loss per share (basic and diluted)  $0.05   $0.05   $0.04   $0.04   $0.03   $0.03   $0.05   $0.03 

 

During 2017, we focused our exploration activity almost entirely on Cerro Quema, as we did not acquire the Camino Rojo project until the end of 2017. In 2018, we conducted work on both Cerro Quema and Camino Rojo. Quarterly variations are due to seasonality (rainy season) for drilling activities and awaiting results from previous quarters’ exploration activities.

 

Administrative costs have trended with the level of activity of the Company. Professional fees have trended with (a) the general activity level of the Company, and (b) major regulatory events such as financings and public listings. The increase in regulatory fees in 2018-Q4 is due to a one-time initial listing fee as the Company started trading on the TSX Exchange.

 

The increase in salaries and wages in 2017-Q4 was related to an accrual of short-term incentive (bonus) payments, as was the increase in 2018-Q3. In 2018-Q4, we accrued for payments related to the departure of the former CEO, which were paid subsequent to the year end.

 

Share based payments expense is generally related to the number of unvested stock options and RSUs outstanding during the quarter. The grants typically happen during Q2 of each year; consequently, those quarters tend to be greater than others. The increase in share-based payments in 2018-Q4 was related to options and bonus shares granted to the incoming CEO.

 

Interest income is directly related to cash on hand, and prevailing interest rates, as we typically invest in higher quality interest-bearing instruments and term deposits. Included within “finance costs” above is fair value adjustment on the loan from Goldcorp, from which we commenced receiving advances in 2018-Q1.

 

Foreign exchange gains and losses vary based on fluctuation of the Canadian dollar versus foreign currency amounts on hand. We tend to hold most of our funds in Canadian dollars until needed.

 

In 2017-Q4, we wrote off the Blue Quartz project.

 

Page 11

 

 

ORLA MINING LTD.

Annual Information Form

Year ended December 31, 2018 

Canadian dollars unless otherwise stated

 

6.Fourth Quarter of 2018

 

The following table is based on financial statements prepared in accordance with IFRS. The figures have been restated because of a change in accounting policy (see note 3 of the financial statements) and are expressed in thousands of Canadian dollars.

 

A.Comparison to the previous quarter

 

   2018-Q4   2018-Q3   Difference   Discussion
Exploration expense  $6,066   $7,056   $(990)  Decreased drilling and land payments at Camino Rojo.
General and administrative   183    144    39    
Professional fees   176    79    97   Increased due to TSX listing, regulatory, and prospectus.
Regulatory and transfer agent   205    19    186   One-time initial listing fees in Q4 for TSX Exchange.
Salaries and wages   836    422    414   Accrual in Q4 for former CEO costs.
Depreciation   40    40        
Share based payments   1,065    601    464   Option grant and bonus shares to incoming CEO.
Interest income   (105)   (134)   29    
Fair value changes   187    153    34   Another loan advance in Q4, which led to a larger fair value change in the Goldcorp loan.
Foreign exchange   (133)   10    (143)   
Net loss  $8,520   $8,390   $130    
                   

 

B.Comparison to the same quarter last year

 

   2018-Q4   2017-Q4   Difference   Discussion
Exploration expense  $6,066   $3,156   $2,910   Activity at both Cerro Quema and Camino Rojo in 2018.
General and administrative   183    88    95   Overall increased activity over last year.
Professional fees   176    46    130   Legal fees in 2018 related to TSX listing and prospectus.
Regulatory and transfer agent   205    1    204   One-time initial listing fees in Q4 for TSX Exchange.
Salaries and wages   836    813    23    
Depreciation   40    3    37   Site-related depreciation was included in exploration.
Share based payments   1,065    812    253   Option grant and bonus shares to incoming CEO.
Interest income   (105)   (35)   (70)  Greater cash balances on hand, higher interest rates.
Fair value changes   187    8    179   Fair value change of the Goldcorp loan.  None in 2017.
Foreign exchange   (133)   (258)   125    
Impairments       288    (288)  No impairment in 2018.  Wrote off Blue Quartz in 2017.
Net loss  $8,520   $4,922   $3,598    

 

Page 12

 

 

ORLA MINING LTD.    
Management’s Discussion and Analysis    
Year ended December 31, 2018   Canadian dollars unless otherwise stated

 

7.Liquidity

 

Historically the Company's sole source of funding has been the issuance of equity securities for cash, primarily through private placements to sophisticated investors and institutions. We have issued common share capital in many of the past few years, pursuant to private placement financings and the exercise of warrants and options. Our access to exploration financing is always uncertain, and there can be no assurance of continued access to significant equity funding.

 

We had working capital of approximately $13.6 million as at December 31, 2018, compared with $4.8 million at December 31, 2017. We expect to fund the operating costs of the Company over the next twelve months with cash on hand and we expect we will conclude further equity financings over the next twelve months.

 

8.Capital Resources

 

As part of the acquisition of the Camino Rojo Project in November 2017, Goldcorp agreed to provide interest free loans to the Company for all annual land holding costs as they are incurred at Camino Rojo until December 31, 2019, which loans are to be repaid upon commercial production at Camino Rojo. To December 31, 2018, a total of MXN 122 million ($8.2 million) had been advanced pursuant to this agreement (to December 31, 2017 – nil). To the date of this MD&A, a total of MXN 173 million ($12.0 million) had been advanced to the Company. We will avail ourselves of these loans during 2019 to make our land payments. Accordingly, we believe the Company has sufficient capital resources to maintain its properties in good standing for the next twelve months.

 

The Company had no material commitments for capital expenditures as of December 31, 2018 nor as of the date of this MD&A. We have no other lines of credit or sources of financing which have been arranged but are as yet unused.

 

Our ability to carry out our long range strategic objectives in future periods depends on our ability to raise financing from lenders, shareholders and other investors. We continue to regularly review and consider financing alternatives to fund the Company’s ongoing activities.

 

Page 13

 

 

ORLA MINING LTD.   
Management’s Discussion and Analysis   
Year ended December 31, 2018  Canadian dollars unless otherwise stated

 

9.Use of Proceeds

 

On February 15, 2018, the Company completed a brokered financing of 17,581,200 units at a price of $1.75 for gross proceeds of $30,767,000. Each unit consisted of one common share and one-half of one common share purchase warrant. The Company incurred issuance costs of $1,777,000.

 

As detailed in the table below comparing the approximate use of proceeds from the Company’s offering of units completed in February 2018 and the actual amounts spent as of December 31, 2018, the Company has yet to spend the full amount allocated under the February 2018 prospectus. It is likely we will spend the full amount allocated to activities in the table below in upcoming financial periods. Further, there have been no variances to the use of proceeds in the February 2018 prospectus, material or otherwise, that have impacted the Company’s ability to achieve its business objectives and milestones as disclosed in the February 2018 prospectus.

 

in thousands of Canadian dollars  Intended use
of proceeds
per Feb 2018
prospectus
   Spent to
December 31
 2018
 
Camino Rojo Project          
Project management  $400   $298 
Drilling (core, metallurgy)   4,300    1,985 
Engineering, technical studies and geology   3,500    1,379 
Environment, CSR, permitting, ejido   1,800    99 
Field & site support   1,200    1,840 
Value-added taxes (IVA)   1,300    743 
Cerro Quema project          
Drilling   1,900    1,958 
Environment, CSR, permitting, community   2,000    315 
Engineering, technical studies and geology   2,000    911 
Camp and support, and project management   1,500    1,170 
Salaries and benefits   2,000    1,713 
Other          
Exploration and project evaluation   850    772 
Working capital and general corporate   2,335    2,810 
Total:  $25,085   $15,993 

 

At the Camino Rojo project, our intent was to complete a PEA, which was completed in Q2 of 2018. Our intent was also to drill regional targets but the regional work focused mainly on target identification rather than drilling. Much of the CSR and land payments were funded via an interest free loan from Goldcorp. Work continues on advancing the project.

 

At the Cerro Quema project, our intent was to collect the geological, geophysical, and other data required to support the undertaking of an updated mineral resource estimate and a pre-feasibility study on the project. We conducted exploration drilling and metallurgical drilling and completed IP surveys in furtherance of these objectives.

 

10.Off-Balance Sheet Arrangements

 

We have no material off-balance sheet arrangements requiring disclosure under this section.

 

Page 14

 

 

ORLA MINING LTD.   
Management’s Discussion and Analysis   
Year ended December 31, 2018  Canadian dollars unless otherwise stated

 

11.Related Party Transactions

 

This information is provided in note 14 of the accompanying quarterly financial statements.

 

12.Critical Accounting Estimates

 

In preparing these consolidated financial statements, we have made judgements, estimates and assumptions that affect the application of accounting policies and the reported amounts of assets, liabilities, income and expenses. Actual results may differ from these estimates.

 

We review estimates and their underlying assumptions on an ongoing basis. Revisions to estimates are recognized prospectively.

 

Judgements, estimates, and assumptions that we have made in applying accounting policies that have the most significant effects on the amounts recognized in these consolidated financial statements include:

 

A.Functional currency

 

The functional currency for the parent entity and each of its subsidiaries is the currency of the primary economic environment in which the entity operates. Determination of functional currency involves judgements to identify the primary economic environment. We reconsider the functional currency of each entity if there is a change in the underlying transactions, events and conditions which we used to determine the primary economic environment of that entity.

 

B.Business combinations

 

Determining whether a set of the assets acquired and liabilities assumed constitute the acquisition of a business or the acquisition of an asset requires us to make certain judgements as to whether or not the assets acquired and liabilities assumed include the inputs, processes and outputs necessary to constitute a business as defined in IFRS 3 «Business Combinations». If an acquired set of assets and liabilities includes goodwill, the set is presumed to be a business. Based on an assessment of relevant facts and circumstances, management of the Company concluded that the acquisitions of Cerro Quema in 2016 and of Camino Rojo in 2017 were acquisitions of assets. The values assigned to common shares, stock options and warrants issued and the allocation of the purchase price to the net assets in the acquisition were based on estimates and judgements including discount rates, volatility, expected option and warrant lives and the relative fair values of the net assets.

 

C.Exploration and evaluation expenditures

 

The application of the Company’s accounting policy for E&E expenditure requires judgement to determine whether future economic benefits are likely from either future exploitation or sale (prior to which we expense all E&E expenditures, and subsequent to which we capitalize the acquisition costs). It also requires us to make judgements on whether activities have reached a stage that permits development of the mineral resource (prior to which they are treated as E&E expenditures, and subsequent to which we treat such costs as projects under development and construction).

 

We must also apply a number of estimates and assumptions, such as the determination of the quantities and types of mineral resources, which itself involves varying degrees of uncertainty depending on resource classification (measured, indicated or inferred). These estimates directly impact accounting decisions related to our E&E expenditures.

 

We must make certain estimates and assumptions about future events and circumstances, particularly, whether economic mineral exploitation is viable. Any such estimates and assumptions may change as new information becomes available. If, after expenditure is capitalized, information becomes available suggesting that the recovery of expenditure is unlikely, we assess indicators of impairment and may conclude to write off such amounts to the statement of profit or loss.

 

Page 15

 

 

ORLA MINING LTD.   
Management’s Discussion and Analysis   
Year ended December 31, 2018  Canadian dollars unless otherwise stated

 

D.Title to mineral properties

 

Although the Company has taken steps to verify title to mineral properties in which it has an interest, these procedures do not guarantee the Company’s title. Such properties may be subject to prior agreements or transfers and title may be affected by undetected defects. Further, we make judgements for properties where concessions terms have expired, and a renewal application has been made and is awaiting approval. We use judgement as to whether the concession renewal application is probable to be received, but ultimately this is beyond our control. If a renewal application is not approved, we could lose rights to those concession.

 

E.Assessment of impairment indicators

 

We apply judgement in assessing whether indicators of impairment or reverse impairment exist for our E&E assets which could result in a test for impairment. We consider internal and external factors, such as our rights to explore, planned expenditures on E&E activities, the technical results of our E&E activities, and the potential for viable operations, to determine whether there are any indicators of impairment or reversal of a previous impairment.

 

F.Share based payments

 

We issue, grant or award different types of share based payments. These include warrants, options, restricted share units, deferred share units, and bonus shares.

 

We make judgments of expected forfeiture rates, the expected lives of these instrument, expected volatilities, and risk free interest rates. In a unit offering, we prorate the proceeds between common shares and warrants using the relative fair value method, the allocation of which requires significant judgement. In the case of bonus shares we use our judgement to estimate expected vesting periods and vesting probabilities.

 

G.Site closure provisions

 

We make estimates and assumptions in determining the provisions for asset retirement and site closure. The ultimate rehabilitation costs are uncertain, and cost estimates can vary in response to many factors, including judgements of the extent of rehabilitation activities, technological changes, and regulatory changes. We make estimates of rehabilitation costs and of cost increases, inflation rates, and discount rates. These uncertainties will result in actual future expenditures differing from the amounts currently provided. Consequently, there could be significant adjustments to the provisions established, which would affect future financial position, results of operations, and changes in financial position.

 

13.Change in Accounting Policies including Initial Adoption

 

A.IFRS 15 «Revenue from Contracts with Customers»

 

We adopted IFRS 15 effective January 1, 2018.

 

IFRS 15 introduced a five-step approach to revenue recognition. Under IFRS 15, an entity recognizes revenue when a performance obligation is satisfied, which occurs when the customer has acquired control of the goods transferred.

 

As we have no metal sales, the adoption of this new standard had no material impact on our financial position, results of operations, or changes in financial position.

 

Page 16

 

 

ORLA MINING LTD.   
Management’s Discussion and Analysis   
Year ended December 31, 2018  Canadian dollars unless otherwise stated

 

B.IFRS 9 «Financial Instruments»

 

We adopted IFRS 9 on a retrospective basis without the restatement of comparative periods.

 

The key requirements of IFRS 9 as they relate to the Company include the following:

 

·Subsequent to initial measurement at fair value, all recognized financial assets that are within the scope of IFRS 9 must be subsequently measured at amortized cost or fair value. Financial assets that are held within a business model whose objective is to collect the contractual cash flows, and that have contractual cash flows that are solely payments of principal and interest on the principal outstanding are generally measured at amortized cost in subsequent periods. Those financial assets that have a business model whose objective is achieved by both collecting the contractual cash flows and selling financial assets, are generally measured at fair value through other comprehensive income (“FVOCI”). All other financial assets are measured at fair value through profit or loss (“FVTPL”) in subsequent accounting periods.

 

·On initial recognition, for an equity investment that is not held for trading, the Company may irrevocably elect to present subsequent changes in the investment’s fair value through OCI, with only dividend income generally recognized in profit or loss.

 

·Transaction costs for financial assets held at FVTPL are expensed. For all other financial assets, they are recognized at fair value at initial measurement less any directly attributable transaction costs.

 

·The classification of financial liabilities determines the method by which the financial liabilities are carried on the balance sheet subsequent to inception and how changes in their fair value are recorded. Financial liabilities are designated as either: (i) FVTPL; or (ii) other financial liabilities which are classified and subsequently measured at amortized cost.

 

·At each reporting date, we assess whether there is objective evidence that a financial asset or a group of financial assets is impaired. For financial assets measured at amortized cost, and debt investments at FVOCI, we apply the expected credit loss model. The adoption of the expected credit loss model did not result in a material adjustment on adoption.

 

None of the Company’s classifications of its financial instruments have changed as a result of the adoption of IFRS 9.

 

C.IFRS 16 «Leases»

 

A new accounting standard applicable to the Company, IFRS 16 «Leases», has an effective date of January 1, 2019. We have not chosen to early-adopt this new standard. This new standard specifies how to recognise, measure, present, and disclose leases. The standard provides a single lessee accounting model, requiring lessees to recognise assets and liabilities for all leases unless they fall within permitted exemptions.

 

To prepare for this standard, we trained our accounting staff on the new standard, built a database of existing agreements which may contain leases as defined in the new standard, and reviewed contracts which may be affected by the change. We availed ourselves of the recognition exemptions permitted in the standard (by excluding low value leases and short term leases), and concluded that we have no leases requiring recognition pursuant to the new standard. Consequently, we expect no material effects of this new standard to our financial position, changes in financial position, and results of operations.

 

Page 17

 

 

ORLA MINING LTD.   
Management’s Discussion and Analysis   
Year ended December 31, 2018  Canadian dollars unless otherwise stated

 

14.Financial Instruments

 

In the normal course of business, the Company is inherently exposed to certain financial risks, including market risk, credit risk and liquidity risk, through the use of financial instruments. The timeframe and the manner in which we manage these risks varies based upon our assessment of these risks and available alternatives for mitigation. We do not acquire or issue derivative financial instruments for trading or speculative purposes. All transactions undertaken are to support our operations.

 

A discussion of these financial risks and our exposure to them is provided in note 18 of the accompanying financial statements.

 

15.Outstanding Share Data

 

As of the date of this MD&A, the Company had the following equity securities outstanding:

 

·179,493,510 common shares

 

·18,528,100 warrants

 

·9,124,005 stock options

 

·1,500,000 bonus shares

 

·248,000 restricted share units

 

·180,000 deferred share units

 

You can find further details about these potentially issuable securities in note 13 of the accompanying financial statements.

 

Page 18

 

 

ORLA MINING LTD.  
Management’s Discussion and Analysis  
Year ended December 31, 2018 Canadian dollars unless otherwise stated

 

16.Risks and Uncertainties

 

As the Company has not commenced principal operations, historical revenue and expenditure trends are not indicative of future activity. The Company has committed to certain work expenditures and may enter into future agreements. The ability of the Company to fund its future operations and commitments is dependent on its ability to obtain additional financing. Risks of the Company’s business include the following:

 

Permits and Licenses

 

The exploitation and development of mineral properties may require the Company to obtain regulatory or other permits and licenses from various governmental licensing bodies. There can be no assurance that the Company will be able to obtain all necessary permits and licenses that may be required to carry out exploration, development and mining operations on its properties.

 

The Company is awaiting mineral concession renewals at its Cerro Quema Project. There is no assurance that we will receive necessary approvals or extensions, or receive them within a reasonable period of time. Failure to receive the permits or extensions would have an adverse effect on the Company’s business, financial position, and results of operations.

 

Foreign Country and Political Risk

 

The Company’s principal mineral properties are located in Mexico and Panama. The Company is subject to certain risks, including currency fluctuations, possible political or economic instability that may result in the impairment or loss of mineral titles or other mineral rights, opposition from environmental or other non-governmental organizations, and mineral exploration and mining activities may be affected in varying degrees by political stability and government regulations relating to the mining industry. Any changes in regulations or shifts in political attitudes are beyond the control of the Company and may adversely affect its business. Exploration and development may be affected in varying degrees by government regulations with respect to restrictions on future exploitation and production, price controls, export controls, foreign exchange controls, income taxes, royalties on production, expropriation of property, environmental legislation and mine and/or site safety.

 

Operating in developing economies such as Mexico and Panama has certain risks, including changes to, or invalidation of, government mining regulations; expropriation or revocation of land or property rights; changes in foreign ownership rights; changes in foreign taxation rates; security issues; corruption; uncertain political climate; narco-terrorist actions or activities; and lack of a stable economic climate.

 

We do not ordinarily carry political risk insurance.

 

Dependence on Exploration-Stage Properties

 

The Company’s current efforts are focused primarily on exploration stage properties. The Camino Rojo and the Cerro Quema Projects may not develop into commercially viable ore bodies, which would have a material adverse effect on the Company’s potential mineral resource production, profitability, financial performance and results of operations.

 

Estimates of Mineral Resources & Mineral Reserves and Production Risks

 

The mineral resource and mineral reserve estimates included in this MD&A are estimates based on a number of assumptions, including those stated herein, and any adverse change to those assumptions could require the Company to lower its mineral resource estimate. Until a deposit is actually mined and processed, the quantity and grades of mineral resources must be considered as estimates only. Valid estimates made at a given time may significantly change when new information becomes available. In addition, the quantity and/or economic viability of mineral resources may vary depending on, among other things, metal prices, grades, production costs, stripping ratios, recovery rates, permit regulations and other legal requirements, environmental factors, unforeseen technical difficulties, unusual or unexpected geological formations and work interruptions. Any material change in the quantity of mineral resources, grade or stripping ratio may affect the economic viability of the Company’s properties. No assurance can be given that any particular level of recovery of minerals will in fact be realized or that an identified mineral resource will ever qualify as a commercially mineable (or viable) deposit that can be legally and economically exploited. There can also be no assurance that any discoveries of new mineral reserves will be made. Any material reductions in estimates of mineral resources could have a material adverse effect on the Company’s results of operations and financial condition.

 

Page 19

 

 

ORLA MINING LTD.  
Management’s Discussion and Analysis  
Year ended December 31, 2018 Canadian dollars unless otherwise stated

 

The Camino Rojo Project mineral resource estimate assumes that the Company can access mineral titles and lands that are not controlled by the Company

 

All of the mineralization comprised in the Company’s mineral resource estimate with respect to the Camino Rojo Project is contained on mineral titles controlled by the Company. However, the mineral resource estimate assumes that the north wall of the conceptual floating pit cone used to demonstrate reasonable prospects for eventual economic extraction extends onto lands where mineral title is held by another mining company (the “Adjacent Owner”) and that waste would be mined on the Adjacent Owner’s mineral titles. Any potential development of the Camino Rojo Project that includes an open pit encompassing the entire mineral resource estimate would be dependent on obtaining an agreement with the Adjacent Owner. It is estimated that approximately two-thirds of the mineral resource estimate is dependent on an agreement being obtained with the Adjacent Owner.

 

Delays in, or failure to obtain, an agreement with the Adjacent Owner to conduct mining operations on its mineral titles would affect the development of a significant portion of the mineral resources of the Camino Rojo Project that are not included in the Preliminary Economic Assessment (“PEA”) dated June 19, 2018, in particular by limiting access to significant mineralized material at depth. The Company intends to seek an agreement with the Adjacent Owner in order to maximize the potential to develop a mine that exploits the full mineral resource. There can be no assurance that the Company will be able to negotiate such agreement on terms that are satisfactory to the Company or that there will not be delays in obtaining the necessary agreement. Should an agreement with the Adjacent Owner not be obtained on favourable terms, the economics of any potential mine development using the full mineral resource estimate would be significantly negatively impacted.

 

The PEA was based on only a portion of the total mineral resource estimate and was prepared on the assumption that no mining activities would occur on the Adjacent Owner’s mineral titles. Accordingly, delays in, or failure to obtain, an agreement with the Adjacent Owner to conduct mining operations on its mineral titles would have no impact on the timetable or cost of development of the potential mine modelled in the PEA.

 

Mineral resource estimations for the Camino Rojo Project are only estimates and rely on certain assumptions

 

The estimation of mineral resources relies on the judgment of the independent Qualified Person preparing the estimates. The process relies on the quantity and quality of available data and is based on knowledge, mining experience, analysis of drilling results and industry practices. Valid estimates made at a given time may significantly change when new information becomes available.

 

In particular, the estimation of mineral resources for the Camino Rojo Project has assumed that there is a reasonable prospect for reaching an agreement with the Adjacent Owner. While the Company believes that the mineral resource estimates for the Camino Rojo Project are well established and reflect best estimates, by their nature resource estimates are imprecise and depend on inferences that may ultimately prove to be inaccurate, including the assumption that an agreement with the Adjacent Owner will be reached.

 

Although all mineralization included in the Company’s mineral resource estimate for the Camino Rojo Project are located on mineral concessions controlled by the Company, failure to reach an agreement with the Adjacent Owner would result in a significant reduction of the mineral resource estimate by limiting access to significant mineralized material at depth. Any material changes in mineral resource estimates may have a material adverse effect on the Company.

 

Mining Industry

 

The exploration for and development of mineral deposits involves significant risks, which even a combination of careful evaluation, experience and knowledge may not eliminate. While the discovery of an ore body may result in substantial rewards, few properties which are explored are ultimately developed into producing mines. Major expenses may be required to establish ore reserves, to develop metallurgical processes and to construct mining and processing facilities at a particular site. It is impossible to ensure that the current exploration programs planned by the Company will result in a profitable commercial mining operation.

 

Page 20

 

 

ORLA MINING LTD.  
Management’s Discussion and Analysis  
Year ended December 31, 2018 Canadian dollars unless otherwise stated

 

Whether a mineral deposit will be commercially viable depends on many factors, some of which are the particular attributes of the deposit, such as size, grade and proximity to infrastructure, as well as metal prices which are highly cyclical and government regulations, including regulations relating to prices, taxes, royalties, land tenure, land use, importing and exporting of minerals and environmental protection. The exact effect of these factors cannot be accurately predicted, but the combination of these factors may result in the Company not receiving an adequate return on invested capital.

 

Mining operations generally involve a high degree of risk. The Company’s operations are subject to all the hazards and risks normally encountered in the exploration and development of ore, including unusual and unexpected geology formations, rock bursts, cave-ins, flooding and other conditions involved in the drilling and removal of material, any of which could result in damage to life or property, environmental damage and possible legal liability. The Company’s mineral exploration activities are directed towards the search, evaluation and development of mineral deposits. There is no certainty that the expenditures to be made by the Company as described herein will result in discoveries of commercial quantities of ore. There is aggressive competition within the mining industry for the discovery and acquisition of properties considered to have commercial potential. The Company will compete with other interests, many of which with greater financial resources, for the opportunity to participate in promising projects. Significant capital investment is required to achieve commercial production from successful exploration efforts.

 

Government Regulation

 

The exploration activities of the Company are subject to various federal, provincial and local laws governing prospecting, development, taxes, labour standards, toxic substances and other matters. Exploration activities are also subject to various federal, provincial and local laws and regulations relating to the protection of the environment. These laws mandate, among other things, the maintenance of air and water quality standards, and land reclamation. These laws also set forth limitations on the generation, transportation, storage and disposal of solid and hazardous waste. Although the Company’s exploration activities are currently carried out in accordance with all applicable rules and regulations governing operations and exploration activities, no assurance can be given that new rules and regulations, amendments to current laws and regulations or more stringent implementation thereof could have a substantial adverse impact on the Company’s activities.

 

Title Matters

 

Although the Company has diligently investigated title to all mineral concessions (either granted or under re-application) and, to the best of its knowledge (except as otherwise disclosed herein), titles to all its properties are in good standing, this should not be construed as a guarantee of title. Other parties may dispute title to any of the Company’s mineral properties and any of the Company’s properties may be subject to prior unregistered agreements or transfers and title may be affected by undetected encumbrances or defects or governmental actions.

 

Land Title

 

The Company has investigated ownership of all surface rights in which it has an interest, and, to the best of its knowledge, its ownership rights are in good standing. However, all surface rights may be subject to prior claims or agreement transfers, and rights of ownership may be affected by undetected defects. While to the best of the Company's knowledge, titles to all surface rights are in good standing; however, this should not be construed as a guarantee of title. Other parties may dispute title to the surface rights in which the Company has an interest. The properties may be subject to prior unregistered agreements or transfers and titles may be affected by undetected defects.

 

Environmental Risks and Hazards

 

All phases of the Company’s mineral exploration operations are subject to environmental regulation in the various jurisdictions in which it operates. Environmental legislation is evolving in a manner which will require stricter standards and enforcement, increased fines and penalties for non-compliance, more stringent environmental assessments of proposed projects and a heightened degree of responsibility for companies and their officers, directors and employees. There is no assurance that future changes in environmental regulations, laws and permits, if any, will not adversely affect the Company’s operations. Environmental hazards may exist on the properties on which the Company holds interests which are unknown to the Company at present, which have been caused by previous or existing owners or operators of the properties. The Company may become liable for such environmental hazards caused by previous owners and operators of the properties even where it has attempted to contractually limit its liability.

 

Page 21

 

 

ORLA MINING LTD.  
Management’s Discussion and Analysis  
Year ended December 31, 2018 Canadian dollars unless otherwise stated

 

Government approvals and permits are currently, and may in the future be, required in connection with the Company’s operations. To the extent such approvals are required and not obtained; the Company may be curtailed or prohibited from proceeding with planned exploration or development of mineral properties.

 

Failure to comply with applicable laws, regulations and permitting requirements may result in enforcement actions thereunder, including orders issued by regulatory or judicial authorities causing operations to cease or be curtailed, and may include corrective measures requiring capital expenditures, installation of additional equipment, or remedial actions. Parties engaged in mining operations may be required to compensate those suffering loss or damage by reason of the mining activities and may have civil or criminal fines or penalties imposed for violations of applicable laws or regulations.

 

Commodity Prices

 

The profitability of mining operations is significantly affected by changes in the market price of gold and other minerals. The level of interest rates, the rate of inflation, world supply of these minerals and stability of exchange rates can all cause significant fluctuations in metal prices. Such external economic factors are in turn influenced by changes in international investment patterns and monetary systems and political developments. The price of gold and other minerals has fluctuated widely in recent years, and future serious price declines could cause commercial production to be impracticable.

 

Uninsured Risks

 

The Company carries insurance to protect against certain risks in such amounts as it considers adequate. Risks not insured against include environmental pollution or other hazards against which such corporations cannot insure or against which they may elect not to insure.

 

Compliance with Anti-Corruption Laws

 

Orla is subject to various anti-corruption laws and regulations including, but not limited to, the Corruption of Foreign Public Officials Act (1999). In general, these laws prohibit a company and its employees and intermediaries from bribing or making other prohibited payments to foreign officials or other persons to obtain or retain business or gain some other business advantage. The Company’s primary operations are located in Panama, a country which is perceived as having fairly high levels of corruption. Orla cannot predict the nature, scope or effect of future anti- corruption regulatory requirements to which the Company’s operations might be subject or the manner in which existing laws might be administered or interpreted.

 

Failure to comply with the applicable legislation and other similar foreign laws could expose the Company and/or its senior management to civil and/or criminal penalties, other sanctions and remedial measures, legal expenses and reputational damage, all of which could materially and adversely affect the Company’s business, financial condition and results of operations. Likewise, any investigation of any potential violations of the applicable anti-corruption legislation by Canadian or foreign authorities could also have an adverse impact on the Company’s business, financial condition and results of operations.

 

As a consequence of these legal and regulatory requirements, the Company has instituted policies with regard to business ethics, which have been designed to ensure that Orla and its employees comply with applicable anti-corruption laws and regulations. However, there can be no assurance or guarantee that such efforts have been and will be completely effective in ensuring the Company’s compliance, and the compliance of its employees, consultants, contractors and other agents, with all applicable anticorruption laws and regulations.

 

Conflicts of Interest

 

Certain directors of the Company also serve as directors and/or officers of other companies involved in natural resource exploration and development. Consequently, there exists the possibility for such directors to be in a position of conflict. Any decision made by such directors involving the Company will be made in accordance with their duties and obligations to deal fairly and in good faith with the Company and such other companies. In addition, such directors will declare, and refrain from voting on, any matter in which such directors may have a conflict of interest.

 

Page 22

 

 

ORLA MINING LTD.  
Management’s Discussion and Analysis  
Year ended December 31, 2018 Canadian dollars unless otherwise stated

 

17.Forward Looking Statements

 

This MD&A contains “forward-looking statements” or “forward-looking information” within the meaning of applicable securities legislation (collectively, “forward-looking statements”). Forward-looking statements include, but are not limited to, statements regarding planned exploration and development programs and expenditures, the estimation of mineral resources and mineral reserves, expectations on the potential extension of the expired mineral concessions with respect to the Cerro Quema project; proposed exploration plans and expected results of exploration from each of the Cerro Quema project and the Camino Rojo project; Orla’s ability to obtain required mine licences, mine permits, required agreements with third parties and regulatory approvals, including but not limited to, the receipt of the Environmental & Social Impact Assessment (ESIA) permit related to the Cerro Quema project and other necessary permitting required to implement expected future exploration plans; community and ejido relations; availability of sufficient water for proposed operations; competition for, among other things, capital, acquisitions of mineral reserves, undeveloped lands and skilled personnel; changes in commodity prices and exchange rates; currency and interest rate fluctuations. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, identified by words or phrases such as “expects”, “is expected”, “anticipates”, “believes”, “plans”, “projects”, “estimates”, “assumes”, “intends”, “strategy”, “goals”, “objectives”, “potential”, “possible” or variations thereof or stating that certain actions, events, conditions or results “may”, “could”, “would”, “should”, “might” or “will” be taken, occur or be achieved (or the negative of any of these terms and similar expressions) are not statements of fact and may be forward-looking statements.

 

Forward-looking statements are necessarily based upon a number of factors and assumptions that, if untrue, could cause actual results, performance or achievements to be materially different from future results, performance or achievements expressed or implied by such statements. Forward-looking statements are based upon a number of estimates and assumptions that, while considered reasonable by the Company at this time, are inherently subject to significant business, economic and competitive uncertainties and contingencies that may cause the Company’s actual financial results, performance, or achievements to be materially different from those expressed or implied herein. Some of the material factors or assumptions used to develop forward-looking statements include, without limitation, the future price of gold, anticipated costs and the Company’s ability to fund its programs, the Company’s ability to carry on exploration and development activities, the Company’s ability to secure and to meet obligations under property agreements, the timing and results of drilling programs, the discovery of mineral resources and mineral reserves on the Company’s mineral properties, the obtaining of an agreement with the Adjacent Owner (as defined herein) to develop the entire Camino Rojo Project mineral resource estimate, the timely receipt of required approvals and permits, including those approvals and permits required for successful project permitting, construction and operation of projects, the costs of operating and exploration expenditures, the Company’s ability to operate in a safe, efficient and effective manner and the Company’s ability to obtain financing as and when required and on reasonable terms.

 

Forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those expressed or implied. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Certain important factors that could cause actual results, performance or achievements to differ materially from those in the forward looking statements include, among others: (i) failure to obtain required regulatory and stock exchange approvals with respect to any Offering; (ii) uncertainty and variations in the estimation of mineral resources and mineral reserves; (iii) delays in or failure to obtain an agreement with the Adjacent Owner with respect to the Camino Rojo Project; (iv) health, safety and environmental risks; (v) success of exploration, development and operations activities; (vi) risks relating to foreign operations and expropriation or nationalization of mining operations; (vii) delays in obtaining or failure to obtain governmental permits, or non-compliance with permits; (viii) delays in getting access from surface rights owners; (ix) uncertainty in estimates of production, capital and operation costs and potential for production and cost overruns; (x) the impact of Panamanian or Mexican laws regarding foreign investment; (xi) the fluctuating price of gold; (xii) assessments by taxation authorities in multiple jurisdictions; (xiii) uncertainties related to title to mineral properties; and (xiv) the Company’s ability to identify, complete and successfully integrate acquisitions.

 

Page 23

 

 

ORLA MINING LTD.  
Management’s Discussion and Analysis  
Year ended December 31, 2018 Canadian dollars unless otherwise stated

 

This list is not exhaustive of the factors that may affect any of the Company’s forward-looking statements. Although the Company believes its expectations are based upon reasonable assumptions and have attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. See the section entitled “Risks and Uncertainties” in this MD&A for additional risk factors that could cause results to differ materially from forward-looking statements.

 

You are cautioned not to put undue reliance on forward-looking statements. The forward-looking statements contained herein are made as of the date of this MD&A and, accordingly, are subject to change after such date. We disclaim any intent or obligation to update publicly or otherwise revise any forward-looking statements or the foregoing list of assumptions or factors, except in accordance with applicable securities laws. You are urged to read the Company’s filings with Canadian securities regulatory agencies, which you can view online under the Company’s profile on SEDAR at www.sedar.com

 

 

18.Abbreviations Used

 

$, or C$ Canadian dollars
   
US$ United States dollars
   
AIF Annual Information Form
   
Ag Silver
   
Au Gold
   
Camino Rojo Report An independent technical report for the Camino Rojo Project entitled “Preliminary Economic Assessment NI 43-101 Technical Report on the Camino Rojo Gold Project, Municipality of Mazapil, Zacatecas, Mexico” dated June 19, 2018 (the “Camino Rojo Report”) prepared by Carl E. Defilippi, RM, SME of Kappes Cassiday & Associates (“KCA”), Matthew D. Gray, Ph.D., C.P.G. of Resource Geosciences Incorporated (“RGI”), and Michael G. Hester, FAusIMM of Independent Mining Consultants Inc. (“IMC”).  
   
Canplats Canplats Resources Corporation
   
Cerro Quema Report or
2014 PFS
An independent technical report for the Cerro Quema Project entitled “Cerro Quema Project – Pre-Feasibility Study on the La Pava and Quemita Oxide Gold Deposits” dated August 15, 2014 with an effective date of June 30, 2014 (the “Cerro Quema Report”) prepared by Eugene Puritch, P. Eng., Richard H. Sutcliffe, P.Geo., Tracy Armstrong, P.Geo., Antoine Yassa, P.Geo., David Burga, P.Geo., Kenneth Kuchling, P.Eng., and Fred Brown, P.Geo., of P&E Mining Consultants Inc., Gene Tortelli, PE, George Lightwood, PE, and David Brown, P.Geo., of Golder Associates Inc., and Mark Gorman, PE of KCA.  
   
CFE Comisión Federal de Electricidad, the state-owned electric utility of Mexico
   
Company Orla Mining Ltd.

 

Page 24

 

 

ORLA MINING LTD.  
Management’s Discussion and Analysis  
Year ended December 31, 2018 Canadian dollars unless otherwise stated

 

CSR Community and Social Responsibility
   
ESIA Estudio de Impacto Ambiental, a Panamanian environmental impact study
   
g/t Grams per metric tonne
   
Goldcorp Goldcorp Inc.
   
ha Hectares
   
IFRS International Financial Reporting Standards, as issued by the International Accounting Standards Board
   
IP Induced polarization
   
K tonnes Thousands of metric tonnes
   
Koz Thousands of troy ounces
   
M&I Measured and indicated
   
MD&A Management's Discussion and Analysis
   
NI 43-101 Canadian National Instrument 43-101
   
PEA Preliminary Economic Assessment
   
PFS Pre-Feasibility Study
   
RC Reverse circulation
   
SEDAR

The System for Electronic Document Analysis and Retrieval, a filing system operated by the Canadian Securities Administrators, accessible at:

www.sedar.com

   
tonne 1,000 kilograms (approximately 2,205 pounds)
   
TSX Toronto Stock Exchange

 

Page 25