Management’s Discussion and Analysis

 

Three and nine months ended September 30, 2019

 

Canadian dollars

 

 

 

 

ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2019
Canadian dollars unless otherwise stated

 

1.            Overview

 

Orla Mining Ltd. is a mineral exploration and development company which trades on the Toronto Stock Exchange under the ticker symbol OLA. The “Company”, “Orla”, “we”, and “our” refer to Orla Mining Ltd. and its subsidiaries. Refer to page 26 of this document for a list of abbreviations used.

 

Our corporate strategy is to acquire and develop mineral exploration properties where our expertise can substantially increase shareholder value. We have two material gold projects with near-term production potential based on open pit mining and heap leaching – the Camino Rojo Oxide Gold project in Zacatecas State, Mexico, and the Cerro Quema gold project in Panama.

 

This Management’s Discussion and Analysis (“MD&A”) of the financial condition and results of operations of the Company should be read in conjunction with our unaudited consolidated financial statements for the three and nine months ended September 30, 2019 (the “financial statements”), and the audited consolidated financial statements for the year ended December 31, 2018. You can find additional information regarding the Company, including our Annual Information Form, on SEDAR under the Company’s profile at www.sedar.com.

 

All monetary amounts herein are expressed in Canadian dollars unless otherwise stated.

 

This MD&A is current as of November 12, 2019.

 

Hans Smit, P. Geo, our Chief Operating Officer, is the Qualified Person, as the term is defined in National Instrument 43-101 (“NI 43-101”). He has reviewed and approved the technical information disclosed in this MD&A.

 

2.            Highlights

 

During the three months ended September 30, 2019 and to the date of this MD&A, the Company:

 

·raised $3.6 million through its Early Warrant Exercise Incentive Program,

 

·filed a NI 43-101 Technical Report for the Camino Rojo Oxide Gold project,

 

·submitted applications and associated documentation for permits required to start construction and operation of the Camino Rojo Oxide Gold Project,

 

·awarded the engineering, procurement, and construction management (“EPCM”) contract for the Camino Rojo Oxide Gold Project, and

 

·executed a Commitment Letter for up to US$125 million project facility for the development of the Camino Rojo Oxide Gold Project.

 

3.            Discussion of Operations

 

A.           Camino Rojo, Mexico

 

 

Project Description and History

 

The Camino Rojo Project lies 190 km NE of the city of Zacatecas, 48 km S-SW of the town of Concepcion del Oro, and 54 km S-SE of Newmont Goldcorp Corporation’s (“Newmont”) Peñasquito Mine and consists of eight concessions covering in aggregate approximately 206,000 hectares. In November 2017, we acquired the Camino Rojo Project from Goldcorp Inc. (“Goldcorp”, a predecessor company to Newmont). As currently understood, Camino Rojo is comprised of a near-surface oxide gold and silver deposit, a deeper sulphide zone containing gold, silver, zinc and lead mineralization, and a large area with exploration potential.

 

Page 2

 

 

ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2019
Canadian dollars unless otherwise stated

 

Canplats Resources Corporation (“Canplats”) initially discovered gold-silver mineralization at Camino Rojo in 2007, and they subsequently completed 39,725 metres of drilling, largely delineating the shallow oxide mineralization. Canplats also carried out metallurgical studies prior to being acquired by Goldcorp in 2010. Goldcorp then completed more than 250,000 metres of drilling, conducted airborne and ground geophysical surveys, did extensive geological and mineralogical investigations, and conducted numerous metallurgical studies, which included detailed mineralogical studies, column leach tests on oxide material, size fraction analysis, variability test work and sulphide flotation studies.

 

The Ejido San Tiburcio holds the surface rights over the main area of known mineralization. Exploration has been carried out under the authority of agreements between the project operators and the Ejido San Tiburcio. There is a temporary occupation agreement in place with the Ejido San Tiburcio, with the right to expropriate, covering all the area of the mineral resource and area of potential development described in the Camino Rojo Report. Other temporary occupation agreements allow surface access for exploration activities in various other parts of the large property. The Company has water rights in the area of the proposed development.

 

The Company has full rights to explore, evaluate, and exploit the property. However, if sulphide projects are defined through one or more positive pre-feasibility studies with certain development scenarios meeting certain criteria, Newmont has an option to enter into a joint venture with Orla for the purpose of future exploration, advancement, construction, and exploitation of such a sulphide project. If Newmont exercises its option, Orla’s share of the costs to develop the project can be, at Orla’s option, carried to production by Newmont. Orla has a right of first refusal on a sale if Newmont elects to sell its portion of the sulphide project, in whole or in part. The Camino Rojo Asset Purchase Agreement was filed on SEDAR on June 28, 2017. Details of the joint venture are available in our news release dated November 7, 2017, which is available here.

 

On June 24, 2019, we issued the results of a positive Feasibility Study along with a Mineral Reserve estimate on the Camino Rojo Oxide Gold Project. The Feasibility Study supports a technically simple open-pit mine and heap-leach operation with low capital and operating costs providing rapid payback and a strong financial return. An independent technical report prepared in accordance with the requirements of NI 43-101 is available at www.sedar.com under Orla's profile. The new mineral reserve estimate at Camino Rojo includes proven and probable mineral reserves of 44.0 million tonnes at a gold grade of 0.73 grams per tonne ("g/t") and a silver grade of 14.2 g/t, for total mineral reserves of 1.03 million ounces of gold and 20.1 million ounces of silver. All mineral reserves are contained and accessible from within Orla's mineral concessions.

 

Updated measured and indicated mineral resources, inclusive of mineral reserves, amount to 353.4 million tonnes at 0.83 g/t gold and 8.83 g/t silver, resulting in an estimated 9.46 million ounces of gold and 100.4 million ounces of silver. Inferred mineral resources are 60.9 million tonnes at 0.87 g/t gold and 7.41 g/t silver, resulting in an estimated 1.70 million ounces of gold and 14.5 million ounces of silver. Further details on the mineral resource and mineral reserve estimates are provided below and in the technical report.

 

Camino Rojo Feasibility Study

 

The Camino Rojo Feasibility Study considers near-surface open pit mining of 44.0 million tonnes of oxide and transitional ore at a throughput rate of 18,000 tonnes per day. Ore from the pit will be crushed to 80% passing 28 mm, conveyor stacked onto a heap leach pad and leached using a low concentration sodium cyanide solution. Pregnant solution from the heap leach will be processed in a Merrill-Crowe recovery plant where gold and silver will be precipitated and doré will be produced. The site's proximity to infrastructure, low stripping ratio, compact footprint and flat pad location all contribute to project simplicity and relatively low estimated AISC of US$576 per ounce of gold.

 

The Feasibility Study was prepared by a team of independent industry experts led by Kappes Cassiday and Associates ("KCA") and supported by Independent Mining Consultants ("IMC"), Resource Geosciences Incorporated ("RGI"), Barranca Group LLC, Piteau Associates Engineering Ltd., and HydroGeoLogica Inc (“HGL”).

 

Page 3

 

 

ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2019
Canadian dollars unless otherwise stated

 

The Feasibility Study incorporates geological, assay, engineering, metallurgical, geotechnical, environmental and hydrogeological information collected by Orla and previous owners since 2007, including 370,566 metres of drilling in 911 holes. Predicted average gold recoveries of 64% are based on results from 85 column tests.

 

Operating costs are based on contract mining with all other mine components being owned and operated by Orla. Capital costs were estimated primarily using budgetary supplier quotes for all major and most minor equipment as well as contractor quotes for major construction contracts.

 

The following tables presents the key assumptions and detailed results of the Feasibility Study:

 

Table 1: Summary of Key Assumptions and Economics of the Camino Rojo Feasibility Study

 

Production Data  Values   Units 
Life of Mine   6.8    years 
Mine Throughput   18,000    tonnes/day 
Mine Throughput   6,570,000    tonnes/year 
Total Tonnes to Crusher   44,020,000    tonnes 
Grade Au (Average)   0.73    g/t 
Grade Ag (Average)   14.2    g/t 
Contained Gold oz   1,031,000    ounces 
Contained Silver oz   20,093,000    ounces 
Metallurgical Recovery Gold (Overall)   64    % 
Metallurgical Recovery Silver (Overall)   17    % 
Average Annual Gold Production   97,000    ounces 
Average Annual Silver Production   511,000    ounces 
Total Gold Produced   662,000    ounces 
Total Silver Produced   3,479,000    ounces 
LOM Strip Ratio   0.54     waste:ore 

 

Operating Costs (Average LOM)             
Mining (mined)   US$2.14     /tonne mined  
Mining (processed)   US$3.30     /tonne processed  
Processing & Support   US$3.38     /tonne processed  
G&A   US$1.75     /tonne processed  
Total Operating Cost   US$8.43     /tonne processed  
By-Product Cash Cost   US$515     /ounce Au  
All-in Sustaining Cost   US$576     /ounce Au  

 

Page 4

 

 

ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2019
Canadian dollars unless otherwise stated

 

Capital Costs (excluding value added tax)           
Initial Capital   US$123    million 
LOM Sustaining Capital   US$20    million 
LOM Capital   US$144    million 
Working Capital and Initial Fills   US$10    million 
Closure Costs   US$20    million 

 

Financial Analysis          
Gold Price Assumption  US$ 1,250   /ounce 
Silver Price Assumption  US$ 17   /ounce 
Average Annual Cashflow (Pre-Tax)  US$ 72   million 
Average Annual Cashflow (After-Tax)  US$ 56   million 
Internal Rate of Return (IRR), Pre-Tax  38.6%   % 
Internal Rate of Return (IRR), After-Tax  28.7%   % 
NPV @ 5% (Pre-Tax)  US$ 227    million 
NPV @ 5% (After-Tax)  US$ 142    million 
Pay-Back Period (After-Tax)    3.0    years 

 

Note: See reference below regarding non-GAAP metrics. Feasibility Study economics include a 2% royalty and use a USD:MXN exchange rate of 19.3

 

The proposed mine is located 3 kilometres from a paved 4-lane highway and approximately 190 kilometres from the city of Zacatecas. The area is flat and there are no known social or environmental impediments to mining. Orla has all surface, mineral and water rights to develop the project as presented in the Feasibility Study and existing wells produce in excess of the average 24 litres per second of water required for the project.

 

There are no residents within the area of proposed development. The town of San Tiburcio is located 4 kilometres to the east of the proposed development. Orla has a Collaboration and Social Responsibility Agreement with the Ejido San Tiburcio and a 30-year temporary occupation right with an expropriation right over the 2,497 hectares covering the proposed pit and infrastructure area. Orla has an active community and social program in San Tiburcio and other nearby communities of El Berrendo and San Francisco.

 

We expect to commence construction of the Camino Rojo Oxide Project in the first half of 2020 upon receipt of all required permits and project financing. First gold production is planned for mid-2021.

 

Page 5

 

 

ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2019
Canadian dollars unless otherwise stated

 

Sensitivity to Gold Price

 

Table 2: Project Economics Sensitivities to Gold Price

 

Gold Price (US$/oz) US$ 1,150 US$ 1,200 US$ 1,250 US$ 1,300 US$ 1,350 US$ 1,400
After-tax NPV 5% (US$ millions) US$ 109 US$ 125 US$ 142 US$ 158 US$ 174 US$ 190
After-tax IRR (%) 24.0% 26.4% 28.7% 31.0% 33.2% 35.4%
Payback (years) 3.2 3.1 3.0 2.8 2.7 2.6

 

Opportunities

 

The mine plan in the Feasibility Study was developed entirely on Orla's mineral concessions and constrained by the property boundary with no impact to land outside Orla’s mineral concessions. An agreement with the owner of the concession bordering Orla's to the north would allow for the open pit to extend onto the adjacent concession. Such agreement would result in an expanded pit with access to additional oxide and transitional material below the feasibility study pit, which would add to the mine life and/or annual throughput with only modest equipment and infrastructure additions. Orla remains optimistic that an agreement can be reached with the owner of the adjacent concession.

 

The Feasibility Study only considers oxide and transitional material as testing shows gold cannot be economically recovered by the heap leach method from sulphide material. Orla is actively working on studies to investigate economic opportunities that may exist within the 7.3 million ounces of gold contained within the sulphide measured and indicated mineral resources.

 

Orla has title to mineral concessions covering a very large area around the Camino Rojo deposit. Overburden makes exploration challenging, but the discovery in 2007 of mineralization that is incorporated into this Feasibility Study and mineral resource estimate shows that shallow cover can hide very large near-surface deposits. Orla has been trying various exploration techniques and Induced Polarization ("IP") geophysics appears to be the most useful tool. A large area southeast of the current mineral resource has recently been surveyed and drilling on the anomalies identified is expected to start within the next two months. Additional oxide material in the vicinity of the planned development would leverage the infrastructure being proposed in the Feasibility Study. Any additional sulphide material could add to the long-term potential of the property.

 

Permitting

 

Exploration and mining activities in Mexico are subject to control by the federal government department known as SEMARNAT, which has authority over the two principal permits: (1) the Environmental Impact Statement (Manifesto de Impacto Ambiental or MIA, accompanied by a Risk Study), and (2) a Change of Land Use permit accompanied by a Technical Justification Study or ETJ.

 

In early 2018, Orla resumed environmental assessment activities on the project and surrounding area under the guidance of independent environmental permitting consultant Patricia Aguayo. Data from this work has been used in conjunction with information collected by previous operators and project information from Orla's consulting engineers to prepare the documents needed to apply for the MIA and Change of Land Use permits. Permitting documents were submitted to SEMARNAT during the third quarter of 2019.

 

The project is not located in an area with any special federal environmental protection designation and no factors have been identified that would be expected to hinder authorization of required environmental permits. The legislated timelines for the review of properly prepared MIA and Change of Land Use applications and mine operating permits for a project that does not affect federally protected biospheres or ecological reserves are 120 working days and 105 working days, respectively, which can be completed concurrently.

 

Page 6

 

 

ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2019
Canadian dollars unless otherwise stated

 

Orla has contracted ERM, a global consulting company, to review the environmental assessment and proposed mitigation measures for the project. We plan to complete this work in accordance with International Finance Corporation Performance Standards, as well as the International Council on Mining and Metals principles.

 

Next Steps

 

Now that permit applications have been submitted, we are focused on the detailed engineering and planning required to start construction in 2020. In September 2019, we awarded the engineering, procurement, and construction management (“EPCM”) contract for the Camino Rojo Oxide Gold Project to M3 Engineering & Technology Corporation (“M3”), a full service EPCM firm headquartered in Tucson, Arizona.

 

Project Finance Facility

 

On October 21, 2019, we announced the execution of a Commitment Letter with Trinity Capital Partners Corporation (“Trinity Capital”) for a project debt facility of up to US$125 million for the development of the Camino Rojo Oxide Gold Project (the “Project Finance Facility”). The Project Finance Facility is being arranged by Trinity Capital and will include a syndicate of lenders led by Pierre Lassonde, Agnico Eagle Mines Limited (“Agnico Eagle”) and Trinity Capital, creating key alignment between debt and equity holders that will support the Company’s development going forward. In connection with the Commitment Letter, Mr. Lassonde, Agnico Eagle and Trinity Capital have collectively committed to provide an initial tranche of an aggregate of US$25 million, which Orla may draw, at its option, prior to final syndication and completion of definitive documentation relating to the Project Finance Facility and prior to final receipt of required mine permits. This initial advance will provide Orla with the flexibility to order long lead items and maintain an efficient construction schedule. The balance of the Project Finance Facility will be available subject to the completion of definitive documentation, the satisfaction of certain conditions precedent and syndication (“Closing”), which is being arranged by Trinity Capital.

 

Key terms of the Project Finance Facility will include:

 

·Term of 5.0 years.
·Up to US$125 million, with an early drawdown option:
oUS$25 million is committed and, subject to satisfaction of certain conditions precedent, will be available for drawdown prior to Closing at Orla’s option.
oTwo subsequent tranches of US$50 million each, available for drawdown upon Closing and after satisfaction of conditions precedent, including the receipt of key permits required for the development of Camino Rojo.
·Interest rate of 8.8% per annum.
·32.5 million common share purchase warrants to be issued to the lenders on Closing, with an exercise price of C$3.00 per warrant, representing a 97% premium to the closing price of Orla on October 18, 2019, and a 7-year term.
·Principal repayment at maturity with no scheduled amortization: Orla can prepay the loan, in full or in part, at any time during the term, without penalty, with cash flow from operations.
·No mandatory hedging, production payments, offtake, streams, or royalties are required.

  

The Project Finance Facility will include standard and customary project finance terms and conditions with respect to fees and conditions precedent to Closing (including satisfaction of remaining customary due diligence and other approvals) and remains subject to the completion and execution of definitive loan documentation. The issuance of securities under the terms of the Project Finance Facility is subject to regulatory approvals. Closing of the transaction is expected during the fourth quarter of 2019.

 

Page 7

 

 

ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2019
Canadian dollars unless otherwise stated

 

Mineral Reserves

 

Camino Rojo comprises intrusive related, sedimentary strata hosted, polymetallic gold, silver, arsenic, zinc, and lead mineralization. The mineralized zones correspond to zones of sheeted sulphidic veins and veinlet networks, creating a bulk-mineable style of gold mineralization. Mineralization is almost completely oxidized to a depth of approximately 120 metres and then variably oxidized below (transitional to sulphide). The mineral resource estimate was divided into oxide, high and low transitional, and sulphide material. Only the oxide and transitional material were considered in the Feasibility Study for heap leach extraction.

 

The mineral reserve estimate for Camino Rojo is based on an open pit mine plan and mine production schedule developed by IMC. All mineral reserves are located on, and are accessible from, Orla's concessions and support the 6.8-year mine life.

 

The following table presents the initial mineral reserve estimation for the Camino Rojo Oxide Project. Proven and probable mineral reserves amount to 44.0 million tonnes at 0.73 g/t gold and 14.2 g/t silver for 1.03 million contained gold ounces and 20.1 million contained silver ounces. The mineral reserve was estimated based on a gold price of US$1,250 per ounce and a silver price of US$17.00 per ounce. Measured mineral resource in the mine production schedule was converted to proven mineral reserve and indicated mineral resource in the schedule was converted to probable mineral reserve.

 

Table 3: Camino Rojo Mineral Reserves

 

Reserve Class  000's tonnes   Gold (g/t)   Silver (g/t)   Gold (koz)   Silver (koz) 
Proven Mineral Reserve   14,595    0.79    15.1    369.7    7,104 
Probable Mineral Reserve   29,424    0.70    13.7    661.1    12,991 
Total Proven & Probable Reserve   44,019    0.73    14.2    1,031.0    20,095 
   
Notes:
1.The mineral reserve estimate has an effective date of June 24, 2019. Mineral reserves are classified in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum ("CIM") Definition Standards for Mineral Resources and Mineral Reserves, adopted by the CIM Council (as amended) in accordance with the disclosure requirement of NI 43-101
2.Columns may not sum exactly due to rounding
3.Mineral reserves are based on prices of US$1,250/oz gold, US$17/oz silver, USD/MXN exchange rate of 19.3
4.Mineral reserves are based on net smelter return cut-off that vary by time period to balance mine and plant production capacities. They range from a low of US$4.73/t to a high of US$9.00/t
5.Operating costs — mining US$1.94/t mined; process US$3.41/t processed; G&A US$1.32/t processed, includes a 2% royalty
6.Recoveries for gold — Kp 70%, Ki 56%, Transition Hi 60%; Transition Lo 40%; Recoveries for silver — Kp 11%, Ki 15%, TrHi 27%, TrLo 34%7.
7.Gold and silver 100% payable; Refining cost per ounce — Au US$5.00; Ag US$0.50/oz

 

Page 8

 

 

ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2019
Canadian dollars unless otherwise stated

 

Mineral Resources

 

As part of the Feasibility Study efforts, IMC updated the mineral resource estimate from the previous estimate prepared as of April 27, 2018 and previously reported in Orla's May 29, 2018 news release. Mineral resources were divided between oxide and transitional material that could possibly be extracted by open pit mine and processed in a heap leach operation ("Leach Resource") and sulphide material that could possibly be extracted by open pit and processed in a mill ("Mill Resource"). For the Mill Resource, estimates were made for contained gold, silver, lead and zinc. As lead and zinc would not be recovered in a heap leach operation, only gold and silver were estimated for the Leach Resource.

 

Table 4: Mineral Resource Estimate — Gold & Silver

 

Resource Type  000's tonnes   Gold
(g/t)
   Silver
(g/t)
   Gold
(koz)
   Silver
(koz)
 
Leach Resource   Measured Mineral Resource   19,391    0.77    14.9    482.3    9,305 
  Indicated Mineral Resource   75,249    0.70    12.2    1,680.7    29,471 
  Meas./Ind. Mineral Resource   94,640    0.71    12.7    2,163.0    38,776 
  Inferred Mineral Resource   4,355    0.86    5.6    119.8    805 
                           
Mill Resource  Measured Mineral Resource   3,358    0.69    9.2    74.2    997 
  Indicated Mineral Resource   255,445    0.88    7.4    7,221.4    60,606 
  Meas./Ind. Mineral Resource   258,803    0.88    7.4    7,295.6    61,603 
  Inferred Mineral Resource   56,564    0.87    7.5    1,576.9    13,713 
                            
Total Mineral Resource  Measured Mineral Resource   22,749    0.76    14.1    556.5    10,302 
  Indicated Mineral Resource   330,694    0.84    8.5    8,902.1    90,078 
  Meas./Ind. Mineral Resource   353,443    0.83    8.8    9,458.6    100,379 
  Inferred Mineral Resource   60,919    0.87    7.4    1,696.7    14,518 

 

Table 5: Mineral Resource Estimate — Zinc & Lead

 

Resource Type  000's
tonnes
   Lead
(%)
   Zinc
(%)
   Lead
(M lbs)
   Zinc
(M lbs)
 
Mill   Measured Mineral Resource   3,358    0.13    0.38    9.3    28.2 
Resource  Indicated Mineral Resource   255,445    0.07    0.26    404.3    1,468.7 
  Meas./Ind. Mineral Resource   258,803    0.07    0.26    413.6    1,496.8 
  Inferred Mineral Resource   56,564    0.05    0.23    63.1    290.4 
   
Notes:
1.The mineral resource has an effective date of June 7, 2019. The mineral resources are classified in accordance with the CIM Definition Standards in accordance with the disclosure requirement of NI 43-101
2.Columns may not sum exactly due to rounding
3.Mineral resources that are not mineral reserves do not have demonstrated economic viability
4.Mineral resources for leach material are based on prices of US$1,400/oz gold and US$20/oz silver
5.Mineral resources for mill material are based on prices of US$1,400/oz gold, US$20/oz silver, US$1.05/lb lead, and US$1.20/lb zinc
6.Mineral resources are based on net smelter return cut-off of US$4.73/t for leach material and US$13.71/t for mill material
7.Includes 2% royalty and an USD:MXN exchange rate of 19.3
8.Operating costs for Leach resource — mining US$1.65/t mined; process US$3.41/t processed; G&A US$1.32/t processed; Operating costs for Mill resource — mining US$1.65/t mined; process US$12.50/t processed; G&A US$1.20/t processed
9.Leach resource payable — Au 100%; Ag 100%;
Mill resource payable — Au 95%, Ag 95%, Pb 95%, Zn 85%
10.Leach resource refining costs — Au US$5.00/oz; Ag US$0.50/oz; Mill resource refining costs — Au US$1.00/oz; Ag US$1.50/oz; Pb US$0.194/lb; Zn US$0.219/lb
11.The mineral resource estimate assumes that the floating pit cone used to demonstrate reasonable prospects for eventual economic extraction extends onto land held by the adjacent owner. Any potential development of the Camino Rojo Project that includes an open pit encompassing the entire mineral resource estimate would be dependent on obtaining an agreement with the adjacent owner
12.Mineral resources are inclusive of mineral reserves
13.An Inferred Mineral Resource has a lower level of confidence than that applying to an indicated mineral resource and must not be converted to a mineral reserve.

 

It is reasonably expected that the majority of inferred mineral resources could be upgraded to indicated mineral resources with continued exploration.

 

All the mineralization comprised in the mineral resource estimate with respect to the Camino Rojo project is contained on mineral titles controlled by Orla. However, the mineral resource estimate assumes that the north wall of the conceptual floating pit cone used to demonstrate "reasonable prospects for eventual economic extraction" extends onto lands where mineral title is held by an adjacent owner and that waste would be mined on the adjacent owner's mineral titles. Any potential development of the Camino Rojo Project that would include an open pit encompassing the entire mineral resource estimate (oxide and sulphide material) would be dependent on obtaining an agreement with that property owner. It is estimated that approximately two-thirds of the mineral resource estimate is dependent on an agreement being obtained with the adjacent property owner. Delays in, or failure to obtain, such agreement to conduct mining operations on its mineral titles would affect the development of a significant portion of the mineral resources that are not included in the Feasibility Study, in particular by limiting access to significant mineralized material at depth. Orla intends to seek an agreement with the adjacent owner, to maximize the potential to develop a mine that exploits the full mineral resource. We cannot give any assurance that we will be able to negotiate such agreement on terms that are satisfactory to the Company or that there will not be delays in obtaining the necessary agreement. The development scenario presented in the Feasibility Study, including the mineral reserve estimate, does not require a layback agreement with the adjacent owner.

 

Page 9

 

 

ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2019
Canadian dollars unless otherwise stated

 

Additional details on mineral reserve and resource assumptions, risks and data verification can be found in the independent technical report dated June 25, 2019 prepared in accordance with the requirements of NI 43-101 available at www.sedar.com under Orla's profile.

 

Qualified Persons

 

The Feasibility Study was overseen by KCA of Reno, Nevada. IMC of Tucson, Arizona conducted the mineral resource and mineral reserve estimates under the direction of Michael G. Hester, FAusIMM. Mr. Hester was also responsible for the mining components of the Feasibility Study. KCA, under the direction of Carl Defilippi, RM SME, was responsible for the metallurgy, process, general and administration and economic components of the Feasibility Study. Matthew Gray, Ph.D., C.P.G. (AIPG), of Resource Geosciences Incorporated of Rio Rico, Arizona was responsible for the property, geology and environmental components of the Feasibility Study. David Hawkins, C.P.G. (AIPG), was responsible for the hydrogeology model. Each of Messrs. Hester, Defilippi, Gray and Hawkins is a Qualified Person for their respective sections of the Feasibility Study and each of whom is independent of Orla under the definitions of NI 43-101.

 

Non-GAAP Measures

 

The Company has included certain non-GAAP performance measures as detailed below. In the gold mining industry, these are common performance measures but may not be comparable to similar measures presented by other issuers and the non-GAAP measures do not have any standardized meaning. Accordingly, it is intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with generally accepted accounting principles applicable to the Company.

 

Cash Costs per Ounce — we calculated cash costs per ounce by dividing the sum of operating costs, royalty costs, production taxes, refining and shipping costs, net of by-product silver credits, by payable gold ounces. While there is no standardized meaning of the measure across the industry, we believe that this measure is useful to external users in assessing operating performance.

 

All-In Sustaining Costs ("AISC") — we have provided an AISC performance measure that reflects all the expenditures that are required to produce an ounce of gold from operations. While there is no standardized meaning of the measure across the industry, our definition conforms to the all-in sustaining cost definition as set out by the World Gold Council in its guidance dated June 27, 2013. We believe that this measure is useful to external users in assessing operating performance and the Company’s ability to generate free cash flow from current operations.

 

Page 10

 

 

ORLA MINING LTD.  
Management’s Discussion and Analysis  
Three and nine months ended September 30, 2019 Canadian dollars unless otherwise stated

 

June 27, 2013. We believe that this measure is useful to external users in assessing operating performance and the Company’s ability to generate free cash flow from current operations.

 

Other activities during the three months ended September 30, 2019, and future plans

 

Work related to completion of the feasibility study and permitting documents was the primary focus for the Camino Rojo project in the first two months of Q3 of 2019. In September, detailed engineering commenced.

 

During the quarter ended September 30, 2019, for the Camino Rojo project, we

 

·completed and filed a NI 43-101 technical report in support of the feasibility study;
·selected an EPCM contractor;
·completed environmental permit documents and submitted applications to the environmental authorities;
·commenced hiring key senior managers at site;
·started detailed engineering;
·drilled 6 wells to monitor water depth and quality for a total of 510 metres of drilling.

 

As well as development related activities, we continue to conduct a limited regional exploration program. In Q3 of 2019, 6 reverse circulation (“RC”) holes totaling 1,772 metres were drilled on a low amplitude chargeability anomaly southeast of the resource area outlined in an induced polarization (“IP”) survey completed earlier in the year. No significant alteration was encountered. The anomaly is assumed to be related to abundant groundwater encountered in the holes.

 

In Q3, we conducted a total of 97 line-km of IP in the southwest part of the property in a number of small grids centered on overburden covered areas with potential structural intercepts and indications of alteration in the general vicinity. A further 16 line-km were completed in October for a total of 113 line-km. One of the grids showed a well-defined chargeability anomaly that is roughly 1,000 by 400 metres in size. It is in an area with large structures and rock outcrops to the southeast have zones with strong silicification and weakly anomalous trace-element geochemistry. The area of the anomaly is covered by overburden. Drilling to test this anomaly is planned and permitting has been initiated to allow the work.

 

We continued our CSR activities, and during the quarter, we:

 

·completed construction of a preschool in El Berrendo;
·continued to support Adult Education programs;
·Held the 4th Introduction to Mining Course for local residents;
·supported a number of community events;
·held a cervical cancer detection clinic in coordination with the Zacatecas health authorities;
·supported the community to reactivate the construction of a local health center and in efforts to have a doctor assigned to the community.

 

Page 11

 

 

ORLA MINING LTD.  
Management’s Discussion and Analysis  
Three and nine months ended September 30, 2019 Canadian dollars unless otherwise stated

 

B.Cerro Quema Project, Panama

 

Project Description and History

 

Our 100%-owned Cerro Quema Project is located on the Azuero Peninsula in Los Santos Province, in south western Panama, about 45 kilometres southwest of the city of Chitre and about 190 kilometres southwest of Panama City. The project is at the exploration and development stage for a proposed open pit mine with process by heap leaching. We own the mineral rights as well as the surface rights over the areas of the current mineral resources and mineral reserves, proposed mine development, and the priority drill targets.

 

Mineral concessions are comprised of three contracts between the Republic of Panama and Minera Cerro Quema S.A., a wholly owned subsidiary of Orla. The original 20-year term for these concessions expired on February 26, 2017 (Contracts 19 and 20) and March 3, 2017 (Contract 21). The Company has applied for the prescribed 10-year extension to these contracts as it is entitled to under Panamanian mineral law. On March 6, 2017, the Ministry of Commerce and Industry provided written confirmation to the Company that the extension applications were received, and that exploration work could continue while the Company waits for the renewal. We have received verbal assurances from government officials that the renewal applications are complete with no outstanding legal issues. On April 26, 2017, the Company received authorization from the Ministry of Environment to drill in two areas outside of the existing permitted drill area. On June 28, 2017, the Company received a permit to use water for drilling. A permit was received on May 8, 2018 to drill in the Sombrero zone and on May 11, 2018, we received two permits to use water for drilling. An existing permit that allows drilling in the areas of the current mineral resources was extended for two years in May 2018. In October 2018, the government accepted our 2018 concession tax payments, and in February 2019, we paid the 2019 concession tax payments. A new drilling permit for the Pelona area in the eastern part of the concessions was received on February 11, 2019. All drill permits are currently active. General elections were held in Panama in May 2019, which resulted in a change in federal government effective July 1, 2019.

 

The Company owns the surface rights for land required to mine the Cerro Quema mineral reserves and to construct and operate a heap leach facility, and part of the land required for proposed upgrades to the project access road.

 

A predecessor company to Orla issued a mineral resource estimate and a Pre-Feasibility Study for Cerro Quema, and an independent technical report entitled “Cerro Quema Project – Pre-Feasibility Study on the La Pava and Quemita Oxide Gold Deposits” dated August 15, 2014 with an effective date of June 30, 2014 (the “Cerro Quema Report”).

 

The Cerro Quema Report envisions a standard open pit mine with two pits, one at La Pava and one at Quemita, coupled with a 10,000 tonne per day heap leach facility to extract the gold. With an average head grade of 0.77 g/t Au and a crush size of 80% passing minus 50 mm, an average gold recovery of 86% was estimated. This would result in 418,000 ounces of gold production over a 5.3-year mine life.

 

The Cerro Quema Report, which contains the 2014 mineral resource and mineral reserve estimate and Pre-Feasibility Study, was filed on SEDAR by Pershimco Resources Inc. on August 22, 2014. You can download it from SEDAR here.

 

Page 12

 

 

ORLA MINING LTD.  
Management’s Discussion and Analysis  
Three and nine months ended September 30, 2019 Canadian dollars unless otherwise stated

 

Table 6: Cerro Quema Mineral Reserves

 

Zone  Category  Cut-Off
(Au g/t)
   Tonnes (millions)   Au
(g/t)
   Au
(koz)
 
   Proven   0.21    6.82    0.80    176 
La Pava  Probable   0.21    7.40    0.67    159 
   Sub-Total   0.21    14.22    0.73    335 
   Proven   0.21             
Quema  Probable   0.21    5.49    0.86    153 
   Sub-Total   0.21    5.49    0.86    153 
   Proven   0.21    6.82    0.80    176 
Total  Probable   0.21    12.89    0.75    312 
   Total   0.21    19.71    0.77    488 

 

Notes:
(1)Numbers may not add due to rounding.
(2)A cut-off grade of 0.21 g/t of gold is used for reporting mineral reserves.
(3)Mineral reserves are estimated at a gold price of US$1,300 per ounce.
(4)Effective as of June 30, 2014.
(5)See NI 43-101 Technical Report “Cerro Quema Project – Pre-Feasibility Study on the La Pava and Quemita Oxide Gold Deposits” published on August 15, 2014 for additional information. A copy of the report is available on the Company’s website and under the SEDAR profile of Pershimco Resources Inc. at www.sedar.com.

 

Activities during the three months ended September 30, 2019

 

The Company has an ongoing environmental management plan that includes maintaining sediment dams, reforestation of previously disturbed areas and active sediment control activities. Baseline surface water quality sampling and groundwater level measurements are also ongoing.

 

We have an active community relations program which includes providing hot lunches to 5 to 15-year-old children studying in the 12 schools located within a 15 kilometre radius of the Project. We also provide support for various local amateur sports teams, a youth orchestra, local fairs, and cultural events.

 

There have been no exploration activities at Cerro Quema to date in 2019 as the Company has focused its efforts at the Camino Rojo Project.

 

Future Plans

 

Company activities will continue to focus on Camino Rojo for the rest of 2019. In 2020, we plan to update the Cerro Quema Pre-Feasibility Study (“PFS”) on the oxide heap leach gold project initially completed in 2014. This will include updated mineral reserve and mineral resource estimates. In addition to the work on oxide mineralization, we will continue to advance exploration of the Caballito copper-gold sulphide discovery. This style of mineralization, identified in 2018, presents potential value to the project in addition to the current heap-leach oxide gold project. In addition to the 1.2 km long trend north of Caballito through to Quemita, the Pelona area in the eastern part of the project provides extensive target areas for additional Caballito-style mineralization.

 

Page 13

 

 

ORLA MINING LTD.  
Management’s Discussion and Analysis  
Three and nine months ended September 30, 2019 Canadian dollars unless otherwise stated

 

C.Monitor Gold Project, Nevada

 

Option Agreements

 

The Monitor Gold Project is a grassroots project in an area where work by past operators showed extensive areas with samples anomalous in gold and other metals associated with alteration, including silicification, within carbonate rocks. Stratigraphic assemblages known to host mineral deposits elsewhere in Nevada are found in the area and there are a number of major structures which could provide conduits for mineralizing fluids. We conducted no significant work on the Monitor Gold Project in the quarter ended September 30, 2019.

 

4.Summary of Quarterly Results

 

The figures in the following table are based on the financial statements prepared in accordance with IFRS. The figures have been restated because of a change in accounting policy (see note 3 of the audited financial statements for the year ended December 31, 2018) and are expressed in thousands of Canadian dollars.

 

   2019-Q3   2019-Q2   2019-Q1   2018-Q4   2018-Q3   2018-Q2   2018-Q1   2017-Q4 
Exploration expense  $4,784   $3,515   $7,503   $6,066   $7,056   $4,438   $5,273   $3,156 
General and administrative   127    162    217    183    144    126    108    88 
Professional fees   223    148    125    176    79    202    136    46 
Regulatory and transfer agent   39    46    41    205    19    14    40    1 
Salaries and wages   556    564    550    836    422    230    234    813 
Depreciation   34    23    39    40    40    37    36    3 
Share based payments   758    907    1,253    1,065    601    1,523    796    812 
Interest income   (21)   (30)   (62)   (105)   (134)   (117)   (86)   (35)
Interest expense   2    1                         
Foreign exchange   (1)   11    13    (133)   10    (146)   (6)   (258)
Changes in value of Newmont loan   638    76    357    187    153    100    65    8 
Impairment of investment                               27 
Impairment mineral properties                               261 
Tax expense           4                     
Net loss  $7,139   $5,423   $10,040   $8,520   $8,390   $6,407   $6,596   $4,922 
Loss per share (basic and diluted)  $0.04   $0.03   $0.06   $0.05   $0.05   $0.04   $0.04   $0.03 

 

Prior to 2018, our exploration activity almost entirely focused on Cerro Quema, as we did not acquire the Camino Rojo project until the end of 2017. In 2018, we conducted work on both Cerro Quema and Camino Rojo. To date in 2019, we continued work on, completed, and publicly filed the feasibility study for Camino Rojo. Quarterly variations are due to seasonality and timing of mining concession fees, drilling activities and awaiting results from previous quarters’ exploration activities.

 

Administrative costs have trended with the level of activity of the Company. Professional fees have trended with (a) the general activity level of the Company, and (b) major regulatory events such as financings and public listings. The increase in regulatory fees in 2018-Q4 is due to a one-time initial listing fee as the Company started trading on the TSX Exchange.

 

The increase in salaries and wages in 2017-Q4 was related to an accrual of short-term incentive (bonus) payments, as was the increase in 2018-Q3. In 2018-Q4, we accrued for payments related to the departure of the former CEO. Salaries have generally increased in 2019 as we have increased our team in preparation for the construction phase at Camino Rojo.

 

Page 14

 

 

ORLA MINING LTD.  
Management’s Discussion and Analysis  
Three and nine months ended September 30, 2019 Canadian dollars unless otherwise stated

 

Share based payments expense is generally related to the number of stock options and RSUs outstanding vesting during the quarter. The grants occurred during 2017-Q2, 2018-Q2, and 2019-Q1; consequently, those quarters tend to be greater than others as some of the vesting occurs on the date of the grant. The increase in share-based payments in 2018-Q4 was related to options and bonus shares granted to the incoming CEO.

 

Interest income is directly related to cash on hand and prevailing interest rates. From 2018-Q1, we started receiving loan advances from Goldcorp.

 

Foreign exchange gains and losses vary based on fluctuation of the Canadian dollar versus US dollar and Mexican peso amounts on hand. We tend to hold most of our funds in Canadian dollars until needed.

 

5.Third Quarter of 2019

 

The following table is based on financial statements prepared in accordance with IFRS. Figures are expressed in thousands of Canadian dollars.

 

A.Comparison to the previous quarter

 

   2019-Q3   2019-Q2   Difference   Discussion
Exploration expense  $4,784   $3,515   $1,269  

During Q3-2019, we incurred approximately $1.8 million in semi-annual water use and concession fees payments which are due in Q1 and Q3 each year.

 

Excluding those payments, exploration expenses decreased as the Camino Rojo feasibility study had been substantially completed during Q2-2019.

General and administrative   127    162    (35)   
Professional fees   223    148    75   Increased legal and advisory work related to the Project Finance Facility.
Regulatory and transfer agent   39    46    (7)   
Salaries and wages   556    564    (8)   
Depreciation   34    23    11    
Share based payments   758    907    (149)  Higher stock option expense in Q2, partly offset by DSU grant to new director in Q3.
Interest income   (21)   (30)   9    
Interest expense   2    1    1    
Foreign exchange   (1)   11    (12)   
Changes in value of Newmont loan   638    76    562   Due to time value accretion
Loss for the quarter  $7,139   $5,423   $1,716    

 

Page 15

 

 

ORLA MINING LTD.  
Management’s Discussion and Analysis  
Three and nine months ended September 30, 2019 Canadian dollars unless otherwise stated

 

B.Comparison to the same quarter last year

 

   2019-Q3   2018-Q3   Difference   Discussion
Exploration expense  $4,784   $7,042   $(2,258)  Planned decrease in activities at Cerro Quema in 2019.  Decreased spending at Camino Rojo in Q3-2019 compared to same quarter last year as a result of having substantially completed the feasibility study during Q2-2019.
Office and administrative   127    144    (17)   
Professional fees   223    79    144   Increased legal and advisory work related to the Project Finance Facility.
Regulatory and transfer agent   39    19    20    
Salaries and wages   556    422    134   Increased staffing as we prepare for construction activities.
Depreciation   34    34        
Share based payments   758    601    157   DSUs granted to new director in Q3-2019.
Interest income   (21)   (134)   113   Lower cash balances on hand.
Interest expense   2        2    
Foreign exchange   (1)   10    (11)   
Change in value of Newmont loan   638    153    485   Larger loan balance, closer to maturity
Loss for the quarter   7,139   $8,370   $(1,231)   

 

6.Liquidity and Capital Resources

 

Historically the Company's primary source of funding has been the issuance of equity securities for cash, typically through private placements to sophisticated investors and institutions. We have issued common share capital in many of the past few years, pursuant to private placement financings and the exercise of warrants and options. Our access to exploration and construction financing is always uncertain, and there can be no assurance of continued access to significant equity or debt funding, including the Closing of the Project Finance Facility.

 

The Company had working capital of approximately $3.3 million as at September 30, 2019, compared with $13.6 million at December 31, 2018.

 

During Q2 and Q3 of 2019, the early warrant exercise program, as well as other warrant and option exercises, provided $4.0 million in cash.

 

On October 21, 2019, we announced the signing of a commitment letter for a US$125 million Project Finance Facility, of which US$25 million is available for drawdown by the Company prior to Closing. Refer to “Project Finance Facility” on page 7 above.

 

As part of the acquisition of the Camino Rojo Project in November 2017, Goldcorp (now Newmont) agreed to provide interest free loans to the Company for all annual land holding costs as they are incurred at Camino Rojo until December 31, 2019, which loans are to be repaid in cash or shares (at Orla’s option subject to certain restrictions) upon reaching commercial production at Camino Rojo. To September 30, 2019, a total of MXN 219 million ($15.1 million) had been advanced pursuant to this agreement (to December 31, 2018 – MXN 121 million, or $8.2 million).

 

Our ability to carry out our long range strategic objectives in future periods depends on our ability to raise financing from lenders, shareholders and other investors. We continue to regularly review and consider financing alternatives to fund the Company’s ongoing activities. We expect to fund the operating costs and the operating and strategic objectives of the Company over the next twelve months with existing cash on hand, and with further equity and/or debt financings.

 

Page 16

 

 

ORLA MINING LTD.  
Management’s Discussion and Analysis  
Three and nine months ended September 30, 2019 Canadian dollars unless otherwise stated

 

The Company had no material commitments for capital expenditures as of September 30, 2019 nor as of the date of this MD&A.

 

7.Off-Balance Sheet Arrangements

 

We have no material off-balance sheet arrangements requiring disclosure under this section.

 

8.Related Party Transactions

 

This information is provided in note 11 of the accompanying quarterly financial statements.

 

9.Critical accounting estimates

 

In preparing these consolidated financial statements, we have made judgements, estimates and assumptions that affect the application of accounting policies and the reported amounts of assets, liabilities, income and expenses. Actual results may differ from these estimates.

 

We review estimates and their underlying assumptions on an ongoing basis. Revisions to estimates are recognized prospectively.

 

Judgements, estimates, and assumptions that we have made in applying accounting policies that have the most significant effects on the amounts recognized in these consolidated financial statements include:

 

A.Functional currency

 

The functional currency for the parent entity and each of its subsidiaries is the currency of the primary economic environment in which the entity operates. Determination of functional currency involves judgements to identify the primary economic environment. We reconsider the functional currency of each entity if there is a change in the underlying transactions, events and conditions which we used to determine the primary economic environment of that entity.

 

B.Business combinations

 

Determining whether a set of the assets acquired and liabilities assumed constitute the acquisition of a business or the acquisition of an asset requires us to make certain judgements as to whether or not the assets acquired and liabilities assumed include the inputs, processes and outputs necessary to constitute a business as defined in IFRS 3 «Business Combinations». If an acquired set of assets and liabilities includes goodwill, the set is presumed to be a business. Based on an assessment of relevant facts and circumstances, management of the Company concluded that the acquisitions of Cerro Quema in 2016 and of Camino Rojo in 2017 were acquisitions of assets. The values assigned to common shares, stock options and warrants issued and the allocation of the purchase price to the net assets in the acquisition were based on estimates and judgements including discount rates, volatility, expected duration of option and warrant and the relative fair values of the net assets.

 

Page 17

 

 

ORLA MINING LTD.  
Management’s Discussion and Analysis  
Three and nine months ended September 30, 2019 Canadian dollars unless otherwise stated

 

C.Exploration and evaluation expenditures

 

The application of the Company’s accounting policy for E&E expenditure requires judgement to determine whether future economic benefits are likely from either future exploitation or sale (prior to which we expense all E&E expenditures, and subsequent to which we capitalize the acquisition costs). It also requires us to make judgements on whether activities have reached a stage that permits development of the mineral resource (prior to which they are treated as E&E expenditures, and subsequent to which we treat such costs as projects under development and construction).

 

We must also apply a number of estimates and assumptions, such as the determination of the quantities and types of mineral resources, which itself involves varying degrees of uncertainty depending on resource classification (measured, indicated or inferred). These estimates directly impact accounting decisions related to our E&E expenditures.

 

We must make certain estimates and assumptions about future events and circumstances, particularly, whether economic mineral exploitation is viable. Any such estimates and assumptions may change as new information becomes available. If, after expenditure is capitalized, information becomes available suggesting that the recovery of expenditure is unlikely, we assess indicators of impairment and may conclude to write off such amounts to the statement of profit or loss.

 

D.Title to mineral properties

 

Although the Company has taken steps to verify title to mineral properties in which it has an interest, these procedures do not guarantee the Company’s title. Such properties may be subject to prior agreements or transfers and title may be affected by undetected defects. Further, we make judgements for properties where concessions terms have expired, and a renewal application has been made and is awaiting approval. We use judgement as to whether the concession renewal application is probable to be received, but ultimately this is beyond our control. If a renewal application is not approved, we could lose rights to those concession.

 

E.Assessment of impairment indicators

 

We apply judgement in assessing whether indicators of impairment or reverse impairment exist for our E&E assets which could result in a test for impairment. We consider internal and external factors, such as our rights to explore, planned expenditures on E&E activities, the technical results of our E&E activities, and the potential for viable operations, to determine whether there are any indicators of impairment or reversal of a previous impairment.

 

F.Share based payments

 

We issue, grant or award different types of share based payments. These include warrants, options, restricted share units, deferred share units, and bonus shares.

 

We make judgments of expected forfeiture rates, the expected lives of these instrument, expected volatilities, and risk free interest rates. In a unit offering, we prorate the proceeds between common shares and warrants using the relative fair value method, the allocation of which requires significant judgement. In the case of bonus shares we use our judgement to estimate expected vesting periods and vesting probabilities.

 

G.Site closure provisions

 

We make estimates and assumptions in determining the provisions for asset retirement and site closure. The ultimate rehabilitation costs are uncertain, and cost estimates can vary in response to many factors, including judgements of the extent of rehabilitation activities, technological changes, and regulatory changes. We make estimates of rehabilitation costs and of cost increases, inflation rates, and discount rates. These uncertainties will result in actual future expenditures differing from the amounts currently provided. Consequently, there could be significant adjustments to the provisions established, which would affect future financial position, results of operations, and changes in financial position.

 

10.Financial Instruments

 

In the normal course of business, the Company is inherently exposed to certain financial risks, including market risk, credit risk and liquidity risk, through the use of financial instruments. The timeframe and the manner in which we manage these risks varies based upon our assessment of these risks and available alternatives for mitigation. We do not acquire or issue derivative financial instruments for trading or speculative purposes. All transactions undertaken are to support our operations.

 

A discussion of these financial risks and our exposure to them is provided in the notes to the accompanying interim financial statements, and in the audited financial statements for the year ended December 31, 2018.

 

Page 18

 

 

ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2019
Canadian dollars unless otherwise stated

 

11.Outstanding Share Data

 

As of the date of this MD&A, the Company had the following equity securities outstanding:

 

·186,100,177 common shares

 

·18,203,100 warrants

 

·10,919,327 stock options

 

·1,500,000 bonus shares

 

·1,014,972 restricted share units

 

·508,780 deferred share units

   

You can find further details about these potentially issuable securities in the notes to the accompanying financial statements, and in the audited financial statements for the year ended December 31, 2018.

  

Page 19

 

 

ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2019
Canadian dollars unless otherwise stated

 

12.Risks and Uncertainties

 

As the Company has not commenced principal operations, historical revenue and expenditure trends are not indicative of future activity. The Company has committed to certain work expenditures and may enter into future agreements. The ability of the Company to fund its future operations and commitments is dependent on its ability to obtain additional financing. Risks of the Company’s business include the following:

 

Permits and Licenses

 

The exploitation and development of mineral properties may require the Company to obtain regulatory or other permits and licenses from various governmental licensing bodies. There can be no assurance that the Company will be able to obtain all necessary permits and licenses that may be required to carry out exploration, development and mining operations on its properties.

 

The Company is awaiting mineral concession renewals at its Cerro Quema Project. There is no assurance that we will receive necessary approvals or extensions, or receive them within a reasonable period of time. Failure to receive the permits or extensions would have an adverse effect on the Company’s business, financial position, and results of operations. Additional details are provided in the Cerro Quema Project section of this document.

 

The timing of our ability to construct a mine at Camino Rojo is subject to, and may be affected by, timely review and approval by the Mexican environmental and permitting authorities.

 

Foreign Country and Political Risk

 

The Company’s principal mineral properties are located in Mexico and Panama. The Company is subject to certain risks, including currency fluctuations, possible political or economic instability that may result in the impairment or loss of mineral titles or other mineral rights, opposition from environmental or other non-governmental organizations, and mineral exploration and mining activities may be affected in varying degrees by political stability and government regulations relating to the mining industry. Any changes in regulations or shifts in political attitudes are beyond the control of the Company and may adversely affect its business. Exploration and development may be affected in varying degrees by government regulations with respect to restrictions on future exploitation and production, price controls, export controls, foreign exchange controls, income taxes, royalties on production, expropriation of property, environmental legislation and mine and/or site safety.

 

Operating in developing economies such as Mexico and Panama has certain risks, including changes to, or invalidation of, government mining regulations; expropriation or revocation of land or property rights; changes in foreign ownership rights; changes in foreign taxation rates; security issues; corruption; uncertain political climate; narco-terrorist actions or activities; and lack of a stable economic climate.

 

We do not carry political risk insurance.

 

Dependence on Exploration-Stage Properties

 

The Company’s current efforts are focused primarily on exploration stage properties. The Camino Rojo and the Cerro Quema Projects may not develop into commercially viable ore bodies, which would have a material adverse effect on the Company’s potential mineral resource production, profitability, financial performance and results of operations.

 

Estimates of Mineral Resources & Mineral Reserves and Production Risks

 

The mineral resource and mineral reserve estimates included in this MD&A are estimates based on a number of assumptions, including those stated herein, and any adverse change to those assumptions could require the Company to lower its mineral resource estimate. Until a deposit is actually mined and processed, the quantity and grades of mineral resources must be considered as estimates only. Valid estimates made at a given time may significantly change when new information becomes available. In addition, the quantity and/or economic viability of mineral resources may vary depending on, among other things, metal prices, grades, production costs, stripping ratios, recovery rates, permit regulations and other legal requirements, environmental factors, unforeseen technical difficulties, unusual or unexpected geological formations and work interruptions. Any material change in the quantity of mineral resources, grade or stripping ratio may affect the economic viability of the Company’s properties. No assurance can be given that any particular level of recovery of minerals will in fact be realized or that an identified mineral resource will ever qualify as a commercially mineable (or viable) deposit that can be legally and economically exploited. There can also be no assurance that any discoveries of new mineral reserves will be made. Any material reductions in estimates of mineral resources could have a material adverse effect on the Company’s results of operations and financial condition.

 

Page 20

 

 

ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2019
Canadian dollars unless otherwise stated

 

The Camino Rojo Project mineral resource estimate assumes that the Company can access mineral titles and lands that are not controlled by the Company

 

All of the mineralization comprised in the Company’s mineral resource estimate with respect to the Camino Rojo Project is contained on mineral titles controlled by the Company. However, the mineral resource estimate assumes that the north wall of the conceptual floating pit cone used to demonstrate reasonable prospects for eventual economic extraction extends onto lands where mineral title is held by another mining company (the “Adjacent Owner”) and that waste would be mined on the Adjacent Owner’s mineral titles. Any potential development of the Camino Rojo Project that includes an open pit encompassing the entire mineral resource estimate would be dependent on obtaining an agreement with the Adjacent Owner. It is estimated that approximately two-thirds of the mineral resource estimate is dependent on an agreement being obtained with the Adjacent Owner.

 

Delays in, or failure to obtain, an agreement with the Adjacent Owner to conduct mining operations on its mineral titles would affect the development of a significant portion of the mineral resources of the Camino Rojo Project that are not included in the Feasibility Study dated June 25, 2019, in particular by limiting access to significant mineralized material at depth. The Company intends to seek an agreement with the Adjacent Owner in order to maximize the potential to develop a mine that exploits the full mineral resource. There can be no assurance that the Company will be able to negotiate such agreement on terms that are satisfactory to the Company or that there will not be delays in obtaining the necessary agreement. Should an agreement with the Adjacent Owner not be obtained on favourable terms, the economics of any potential mine development using the full mineral resource estimate would be significantly negatively impacted.

 

The Feasibility Study was based on only a portion of the total mineral resource estimate and was prepared on the assumption that no mining activities would occur on the Adjacent Owner’s mineral titles. Accordingly, delays in, or failure to obtain, an agreement with the Adjacent Owner to conduct mining operations on its mineral titles would have no impact on the timetable or cost of development of the potential mine modelled in the Feasibility Study.

 

Mineral resource estimations for the Camino Rojo Project are only estimates and rely on certain assumptions

 

The estimation of mineral resources relies on the judgment of the independent Qualified Person preparing the estimates. The process relies on the quantity and quality of available data and is based on knowledge, mining experience, analysis of drilling results and industry practices. Valid estimates made at a given time may significantly change when new information becomes available.

 

In particular, the estimation of mineral resources for the Camino Rojo Project has assumed that there is a reasonable prospect for reaching an agreement with the Adjacent Owner. While the Company believes that the mineral resource estimates for the Camino Rojo Project are well established and reflect best estimates, by their nature resource estimates are imprecise and depend on inferences that may ultimately prove to be inaccurate, including the assumption that an agreement with the Adjacent Owner will be reached.

 

Although all mineralization included in the Company’s mineral resource estimate for the Camino Rojo Project are located on mineral concessions controlled by the Company, failure to reach an agreement with the Adjacent Owner would result in a significant reduction of the mineral resource estimate by limiting access to significant mineralized material at depth. Any material changes in mineral resource estimates may have a material adverse effect on the Company.

 

Mining Industry

 

The exploration for and development of mineral deposits involves significant risks, which even a combination of careful evaluation, experience and knowledge may not eliminate. While the discovery of an ore body may result in substantial rewards, few properties which are explored are ultimately developed into producing mines. Major expenses may be required to establish ore reserves, to develop metallurgical processes and to construct mining and processing facilities at a particular site. It is impossible to ensure that the current exploration programs planned by the Company will result in a profitable commercial mining operation.

 

Page 21

 

 

ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2019
Canadian dollars unless otherwise stated

 

Whether a mineral deposit will be commercially viable depends on many factors, some of which are the particular attributes of the deposit, such as size, grade and proximity to infrastructure, as well as metal prices which are highly cyclical and government regulations, including regulations relating to prices, taxes, royalties, land tenure, land use, importing and exporting of minerals and environmental protection. The exact effect of these factors cannot be accurately predicted, but the combination of these factors may result in the Company not receiving an adequate return on invested capital.

 

Mining operations generally involve a high degree of risk. The Company’s operations are subject to all the hazards and risks normally encountered in the exploration and development of ore, including unusual and unexpected geology formations, rock bursts, cave-ins, flooding and other conditions involved in the drilling and removal of material, any of which could result in damage to life or property, environmental damage and possible legal liability. The Company’s mineral exploration activities are directed towards the search, evaluation and development of mineral deposits. There is no certainty that the expenditures to be made by the Company as described herein will result in discoveries of commercial quantities of ore. There is aggressive competition within the mining industry for the discovery and acquisition of properties considered to have commercial potential. The Company will compete with other interests, many of which with greater financial resources, for the opportunity to participate in promising projects. Significant capital investment is required to achieve commercial production from successful exploration efforts.

 

Government Regulation

 

The exploration activities of the Company are subject to various federal, provincial and local laws governing prospecting, development, taxes, labour standards, toxic substances and other matters. Exploration activities are also subject to various federal, provincial and local laws and regulations relating to the protection of the environment. These laws mandate, among other things, the maintenance of air and water quality standards, and land reclamation. These laws also set forth limitations on the generation, transportation, storage and disposal of solid and hazardous waste. Although the Company’s exploration activities are currently carried out in accordance with all applicable rules and regulations governing operations and exploration activities, no assurance can be given that new rules and regulations, amendments to current laws and regulations or more stringent implementation thereof could have a substantial adverse impact on the Company’s activities.

 

Title Matters

 

Although the Company has diligently investigated title to all mineral concessions (either granted or under re-application) and, to the best of its knowledge (except as otherwise disclosed herein), titles to all its properties are in good standing, this should not be construed as a guarantee of title. Other parties may dispute title to any of the Company’s mineral properties and any of the Company’s properties may be subject to prior unregistered agreements or transfers and title may be affected by undetected encumbrances or defects or governmental actions.

 

Land Title

 

The Company has investigated ownership of all surface rights in which it has an interest, and, to the best of its knowledge, its ownership rights are in good standing. However, all surface rights may be subject to prior claims or agreement transfers, and rights of ownership may be affected by undetected defects. While to the best of the Company's knowledge, titles to all surface rights are in good standing; however, this should not be construed as a guarantee of title. Other parties may dispute title to the surface rights in which the Company has an interest. The properties may be subject to prior unregistered agreements or transfers and titles may be affected by undetected defects.

 

Page 22

 

 

ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2019
Canadian dollars unless otherwise stated

 

Environmental Risks and Hazards

 

All phases of the Company’s mineral exploration operations are subject to environmental regulation in the various jurisdictions in which it operates. Environmental legislation is evolving in a manner which will require stricter standards and enforcement, increased fines and penalties for non-compliance, more stringent environmental assessments of proposed projects and a heightened degree of responsibility for companies and their officers, directors and employees. There is no assurance that future changes in environmental regulations, laws and permits, if any, will not adversely affect the Company’s operations. Environmental hazards may exist on the properties on which the Company holds interests which are unknown to the Company at present, which have been caused by previous or existing owners or operators of the properties. The Company may become liable for such environmental hazards caused by previous owners and operators of the properties even where it has attempted to contractually limit its liability.

 

Government approvals and permits are currently, and may in the future be, required in connection with the Company’s operations. To the extent such approvals are required and not obtained; the Company may be curtailed or prohibited from proceeding with planned exploration or development of mineral properties.

 

Failure to comply with applicable laws, regulations and permitting requirements may result in enforcement actions thereunder, including orders issued by regulatory or judicial authorities causing operations to cease or be curtailed, and may include corrective measures requiring capital expenditures, installation of additional equipment, or remedial actions. Parties engaged in mining operations may be required to compensate those suffering loss or damage by reason of the mining activities and may have civil or criminal fines or penalties imposed for violations of applicable laws or regulations.

 

Commodity Prices

 

The profitability of mining operations is significantly affected by changes in the market price of gold and other minerals. The level of interest rates, the rate of inflation, world supply of these minerals and stability of exchange rates can all cause significant fluctuations in metal prices. Such external economic factors are in turn influenced by changes in international investment patterns and monetary systems and political developments. The price of gold and other minerals has fluctuated widely in recent years, and future serious price declines could cause commercial production to be impracticable.

 

Uninsured Risks

 

The Company carries insurance to protect against certain risks in such amounts as it considers adequate. Risks not insured against include environmental pollution or other hazards against which such corporations cannot insure or against which they may elect not to insure.

 

Compliance with Anti-Corruption Laws

 

Orla is subject to various anti-corruption laws and regulations including, but not limited to, the Corruption of Foreign Public Officials Act (1999). In general, these laws prohibit a company and its employees and intermediaries from bribing or making other prohibited payments to foreign officials or other persons to obtain or retain business or gain some other business advantage. The Company’s primary operations are located in Panama, a country which is perceived as having fairly high levels of corruption. Orla cannot predict the nature, scope or effect of future anti- corruption regulatory requirements to which the Company’s operations might be subject or the manner in which existing laws might be administered or interpreted.

 

Failure to comply with the applicable legislation and other similar foreign laws could expose the Company and/or its senior management to civil and/or criminal penalties, other sanctions and remedial measures, legal expenses and reputational damage, all of which could materially and adversely affect the Company’s business, financial condition and results of operations. Likewise, any investigation of any potential violations of the applicable anti-corruption legislation by Canadian or foreign authorities could also have an adverse impact on the Company’s business, financial condition and results of operations.

 

As a consequence of these legal and regulatory requirements, the Company has instituted policies with regard to business ethics, which have been designed to ensure that Orla and its employees comply with applicable anti-corruption laws and regulations. However, there can be no assurance or guarantee that such efforts have been and will be completely effective in ensuring the Company’s compliance, and the compliance of its employees, consultants, contractors and other agents, with all applicable anticorruption laws and regulations.

 

Conflicts of Interest

 

Certain directors of the Company also serve as directors and/or officers of other companies involved in natural resource exploration and development. Consequently, there exists the possibility for such directors to be in a position of conflict. Any decision made by such directors involving the Company will be made in accordance with their duties and obligations to deal fairly and in good faith with the Company and such other companies. In addition, such directors will declare, and refrain from voting on, any matter in which such directors may have a conflict of interest.

  

Page 23

 

 

ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2019
Canadian dollars unless otherwise stated

 

13.Forward Looking Statements

 

This MD&A contains “forward-looking statements” or “forward-looking information” within the meaning of applicable securities legislation (collectively, “forward-looking statements”). Forward-looking statements include, but are not limited to, statements regarding (i) planned exploration and development programs and expenditures; (ii) the estimation of mineral resources and mineral reserves; (iii) expectations on the potential extension of the expired mineral concessions with respect to the Cerro Quema project; (iv) proposed exploration plans and expected results of exploration from each of the Cerro Quema project and the Camino Rojo project; (v) the potential for the discovery of additional mineral resources; (vi) Orla’s ability to obtain required mine licences, mine permits, required agreements with third parties and regulatory approvals, including but not limited to, the receipt of the Environmental & Social Impact Assessment (“ESIA”) permit related to the Cerro Quema project and other necessary permitting required to implement expected future exploration plans; (vii) community and ejido relations; (viii) requirements for additional land; (ix) availability of sufficient water for proposed operations; (x) results of feasibility studies, including but not limited to mineral resource and mineral reserve estimation, mine plans and operations, internal rates of return, sensitivities, taxes, net present values, potential recoveries, design parameters, operating costs, capital costs, production data and economic potential; (xi) upside opportunities such as pit wall angles, land agreements, and the development of the sulphide mineral resource, and exploration potential; (xii) the timing and costs for production decisions; (xiii) financing timelines and requirements, including the timing and the amount to be secured relating to the Project Finance Facility; (xiv) the Project Finance Facility, including the proposed terms thereof, the timing for Closing of the Project Finance Facility, the receipt of all required approvals for the Project Finance Facility, commitment and syndication of the balance of the Project Finance Facility, and the expected uses of proceeds of the Project Finance Facility; (xv) timing for start of engineering work, construction, and receipt of permits; (xvi) changes in commodity prices and exchange rates; (xvii) currency and interest rate fluctuations; (xviii) timing for first gold production; and (xix) the Company's objectives and strategies.

 

Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, identified by words or phrases such as “expects”, “is expected”, “anticipates”, “believes”, “plans”, “projects”, “estimates”, “assumes”, “intends”, “strategy”, “goals”, “objectives”, “potential”, “possible” or variations thereof or stating that certain actions, events, conditions or results “may”, “could”, “would”, “should”, “might” or “will” be taken, occur or be achieved (or the negative of any of these terms and similar expressions) are not statements of fact and may be forward-looking statements.

 

Forward-looking statements are necessarily based upon a number of factors and assumptions that, if untrue, could cause actual results, performance or achievements to be materially different from future results, performance or achievements expressed or implied by such statements. Forward-looking statements are based upon a number of estimates and assumptions that, while considered reasonable by the Company at this time, are inherently subject to significant business, economic and competitive uncertainties and contingencies that may cause the Company’s actual financial results, performance, or achievements to be materially different from those expressed or implied herein. Some of the material factors or assumptions used to develop forward-looking statements include, without limitation, (i) the future price of gold; (ii) anticipated costs and the Company’s ability to fund its programs; (iii) the Company’s ability to carry on exploration and development activities; (iv) the Company’s ability to secure and to meet obligations under property agreements; (v) the timing and results of drilling programs; (vi) the discovery of mineral resources and mineral reserves on the Company’s mineral properties; (vii) the obtaining of an agreement with the Adjacent Owner (as defined herein) to develop the entire Camino Rojo Project mineral resource estimate; (viii) the timely receipt of required approvals and permits, including those approvals and permits required for successful project permitting, construction and operation of projects; (ix) the costs of operating and exploration expenditures, (x) assumptions regarding the ability to enter into a definitive agreement regarding the Project Finance Facility; (xi) syndication of the Project Finance Facility; (xii) the accuracy of mineral resource and mineral reserve estimations; (xiii) the loan amount to be received upon closing of the Project Finance Facility; (xiv) that there will be no material adverse change affecting the Company or its properties; (xv) that all required permits and approvals will be obtained; (xvi) that social or environmental issues might exist, are well understood and will be properly managed; (xvii) that there will be no significant disruptions affecting the Company or its properties; (xviii) the Company’s ability to operate in a safe, efficient and effective manner; and (xix) the Company’s ability to obtain financing as and when required and on reasonable terms.

 

Page 24

 

 

ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2019
Canadian dollars unless otherwise stated

 

Forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those expressed or implied. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Certain important factors that could cause actual results, performance or achievements to differ materially from those in the forward looking statements include, among others: (i) failing to enter into a definitive agreement with Trinity Capital or failing to receive commitments or syndicate the balance of the Project Finance Facility; (ii) risks related to uncertainties inherent in the preparation of feasibility studies, drill results and the estimation of mineral resources and reserves, including changes in economic parameters; (iii) risks relating to not securing agreements with third parties or not receiving required permits; (iv) failure to obtain required regulatory and stock exchange approvals with respect to any Offering; (v) uncertainty and variations in the estimation of mineral resources and mineral reserves; (vi) delays in or failure to obtain an agreement with the Adjacent Owner with respect to the Camino Rojo Project; (vii) health, safety and environmental risks; (viii) success of exploration, development and operations activities; (ix) risks relating to foreign operations and expropriation or nationalization of mining operations; (x) delays in obtaining or failure to obtain governmental permits, or non-compliance with permits; (xi) delays in getting access from surface rights owners; (xii) uncertainty in estimates of production, capital and operation costs and potential for production and cost overruns; (xiii) the impact of Panamanian or Mexican laws regarding foreign investment; (xiv) the fluctuating price of gold; (xv) assessments by taxation authorities in multiple jurisdictions; (xvi) uncertainties related to title to mineral properties; (xvii) competition for, among other things, capital, acquisitions of mineral reserves, undeveloped lands and skilled personnel; and (xviii) the Company’s ability to identify, complete and successfully integrate acquisitions.

 

This list is not exhaustive of the factors that may affect any of the Company’s forward-looking statements. Although the Company believes its expectations are based upon reasonable assumptions and have attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. See the section entitled “Risks and Uncertainties” in this MD&A for additional risk factors that could cause results to differ materially from forward-looking statements.

 

You are cautioned not to put undue reliance on forward-looking statements. The forward-looking statements contained herein are made as of the date of this MD&A and, accordingly, are subject to change after such date. We disclaim any intent or obligation to update publicly or otherwise revise any forward-looking statements or the foregoing list of assumptions or factors, except in accordance with applicable securities laws. You are urged to read the Company’s filings with Canadian securities regulatory agencies, which you can view online under the Company’s profile on SEDAR at www.sedar.com

 

Page 25

 

 

ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2019
Canadian dollars unless otherwise stated

 

14.Abbreviations Used

 

$ Canadian dollars
   
AIF Annual Information Form
   
AISC All in Sustaining Cost
   
Ag Silver
   
Au Gold
   
Camino Rojo PEA Report An independent technical report for the Camino Rojo Project entitled “Preliminary Economic Assessment NI 43-101 Technical Report on the Camino Rojo Gold Project, Municipality of Mazapil, Zacatecas, Mexico” dated June 19, 2018 (the “Camino Rojo PEA Report”) prepared by Carl E. Defilippi, RM, SME of Kappes Cassiday & Associates (“KCA”), Matthew D. Gray, Ph.D., C.P.G. of Resource Geosciences Incorporated (“RGI”), and Michael G. Hester, FAusIMM of Independent Mining Consultants Inc. (“IMC”).  
   
Canplats Canplats Resources Corporation
   
Cerro Quema Report
or
2014 PFS
An independent technical report for the Cerro Quema Project entitled “Cerro Quema Project – Pre-Feasibility Study on the La Pava and Quemita Oxide Gold Deposits” dated August 15, 2014 with an effective date of June 30, 2014 (the “Cerro Quema Report”) prepared by Eugene Puritch, P. Eng., Richard H. Sutcliffe, P.Geo., Tracy Armstrong, P.Geo., Antoine Yassa, P.Geo., David Burga, P.Geo., Kenneth Kuchling, P.Eng., and Fred Brown, P.Geo., of P&E Mining Consultants Inc., Gene Tortelli, PE, George Lightwood, PE, and David Brown, P.Geo., of Golder Associates Inc., and Mark Gorman, PE of KCA.  
   
CFE Comisión Federal de Electricidad, the state-owned electric utility of Mexico
   
CIM Canadian Institute of Mining, Metallurgy and Petroleum
   
Company Orla Mining Ltd.
   
CSR Community and Social Responsibility
   
EPCM Engineering, Procurement, and Construction Management
   
ESIA Estudio de Impacto Ambiental, a Panamanian environmental impact study
   
g/t Grams per metric tonne
   
G&A General and administrative costs
   
GAAP Generally accepted accounting principles, which for the Company are IFRS
   
Goldcorp Goldcorp Inc., a predecessor company to Newmont Goldcorp Corporation, prior to April 18, 2019.
   
MXN Mexican pesos
   
Newmont Newmont Goldcorp Corporation, a publicly traded company resulting from the combination of Newmont Mining Corporation and Goldcorp Inc., effective April 18, 2019.
   
ha Hectares
   
HGL HydroGeoLogica Inc.
   
IFRS International Financial Reporting Standards, as issued by the International Accounting Standards Board
   
IMC Independent Mining Consultants Inc.
   
IP Induced polarization
   
IRR Internal rate of return
   
K tonnes Thousands of metric tonnes
   
Koz Thousands of troy ounces

 

Page 26

 

 

ORLA MINING LTD.
Management’s Discussion and Analysis
Three and nine months ended September 30, 2019
Canadian dollars unless otherwise stated

 

KCA Kappes Cassiday and Associates
   
LOM Life of mine
   
M&I Measured and indicated
   
MD&A Management's Discussion and Analysis
   
MIA Manifiesto de Impacto Ambiental.  In English, an Environmental Impact Statement
   
NI 43-101 Canadian National Instrument 43-101 “Standards of Disclosure for Mineral Projects”
   
NPV Net present value
   
PEA Preliminary Economic Assessment
   
Pb Lead
   
PFS Pre-Feasibility Study
   
RC Reverse circulation
   
RGI Resource Geosciences Incorporated
   
SEDAR The System for Electronic Document Analysis and Retrieval, a filing system operated by the Canadian Securities Administrators, accessible at: www.sedar.com
   
SEMARNAT Secretaría del Medio Ambiente y Recursos Naturales.  In English, the Secretariat of Environment and Natural Resources (Mexico)
   
t Metric tonne, equal to 1,000 kilograms (approximately 2,205 pounds)
   
TSX Toronto Stock Exchange
   
US$ United States dollars
   
Zn Zinc

  

Page 27