EX-33.6 7 ex336.htm

 

January 28, 2026

Management’s Assertion

 

Report on Assessment of Compliance with Applicable Servicing Criteria

 

 

Park Bridge Lender Services LLC (the “Asserting Party” or “PBLS”) is responsible for assessing its compliance, as of and for the calendar year ended December 31, 2025 (the “Reporting Period”), with the servicing criteria set forth in Title 17, Section 229.1122(d) of the Code of Federal Regulations.

The transactions covered by this assertion are those transactions processed by the Asserting Party in its capacity as operating advisor or trust advisor for the asset-backed securities transactions listed in Exhibit A attached hereto (the “Platform”)1.

The Asserting Party is responsible for assessing its compliance with the servicing criteria applicable to it. The Asserting Party used the criteria in paragraph (d) of Item 1122 of Regulation AB (17 C.F.R. 229.1122) to assess its compliance. The full outline of the Asserting Party’s contractually applicable servicing criteria under various securitization pooling and servicing agreements can be found in Exhibit B attached hereto. The servicing criteria listed in the column title “Inapplicable Servicing Criteria” on Exhibit B hereto are not applicable to the Asserting Party based on the activities it performs with respect to the Platform.

Based on its assessment, the Asserting Party believes that, as of and for the periods the contractual obligations existed for the Platform in the Reporting Period listed in Exhibit A, the Asserting Party has complied in all material respects with the servicing criteria listed in the column titled “Applicable Servicing Criteria” on Exhibit B hereto (the “Applicable Servicing Criteria”).

Forvis Mazars, LLP, an independent registered public accounting firm, has issued an attestation report on the assessment of compliance with the Applicable Servicing Criteria for the Reporting Period as set forth in this assertion.

Signed:

/s/

 

David M. Rodgers

Principal

 

 

 

 

1 PBLS’s Platform consists of certain transactions for which the Company provides operating advisor services for (i) publicly issued commercial mortgage-backed securities and (ii) certain commercial mortgage-backed transactions for which an operating advisor has been engaged under the Securities Exchange Act of 1934, as amended.

 

 

 
Exhibit A
         
Asserting Party's 2025 Servicing Platform
         
    Applicable Certification Period
Securitization Transaction   Start Date   End Date
3650R 2021-PF1   January 01, 2025 to December 31, 2025
3650R 2022-PF2   January 01, 2025 to December 31, 2025
8 Spruce   January 01, 2025 to December 31, 2025
AHPT 2025-ATRM   August 15, 2025 to December 31, 2025
ALA 2025-OANA   June 13, 2025 to December 31, 2025
AOA 2021-1177   January 01, 2025 to October 15, 2025
AOA 2025-1301    August 14, 2025 to December 31, 2025
ARDN 2025-ARCP   June 17, 2025 to December 31, 2025
AREIT 2021-CRE5   January 01, 2025 to April 17, 2025
ARES 2024-IND   January 01, 2025 to December 31, 2025
Aventura Mall 2018-AVM   January 01, 2025 to December 31, 2025
BACM 2016-UBS10   January 01, 2025 to December 31, 2025
BACM 2017-BNK3   January 01, 2025 to December 31, 2025
BAHA 2024-MAR   January 01, 2025 to December 31, 2025
BAMLL 2021-JACX   January 01, 2025 to December 31, 2025
BAMLL 2025-1105W   December 15, 2025 to December 31, 2025
BAMLL 2025-HYT   December 18, 2025 to December 31, 2025
Bancorp 2017-CRE2   January 01, 2025 to June 17, 2025
Bancorp 2018-CRE3   January 01, 2025 to June 17, 2025
Bancorp 2018-CRE4   January 01, 2025 to June 17, 2025
Bancorp 2019-CRE5   January 01, 2025 to December 31, 2025
BANK 2017-BNK5   January 01, 2025 to December 31, 2025
BANK 2017-BNK6   January 01, 2025 to December 31, 2025
BANK 2017-BNK8   January 01, 2025 to December 31, 2025
BANK 2017-BNK9   January 01, 2025 to December 31, 2025
BANK 2018-BNK11   January 01, 2025 to December 31, 2025
BANK 2018-BNK12   January 01, 2025 to December 31, 2025
BANK 2018-BNK14   January 01, 2025 to December 31, 2025
BANK 2018-BNK15   January 01, 2025 to December 31, 2025
BANK 2019-BNK16   January 01, 2025 to December 31, 2025
BANK 2019-BNK19   January 01, 2025 to December 31, 2025
BANK 2019-BNK20   January 01, 2025 to December 31, 2025
BANK 2019-BNK21   January 01, 2025 to December 31, 2025
BANK 2019-BNK23   January 01, 2025 to December 31, 2025
BANK 2019-BNK24   January 01, 2025 to December 31, 2025
BANK 2020-BNK26   January 01, 2025 to December 31, 2025
BANK 2020-BNK27   January 01, 2025 to December 31, 2025
BANK 2020-BNK28   January 01, 2025 to December 31, 2025
BANK 2020-BNK30   January 01, 2025 to December 31, 2025
BANK 2021-BNK31   January 01, 2025 to December 31, 2025
BANK 2021-BNK32   January 01, 2025 to December 31, 2025
BANK 2021-BNK33   January 01, 2025 to December 31, 2025
BANK 2021-BNK35   January 01, 2025 to December 31, 2025
BANK 2021-BNK37   January 01, 2025 to December 31, 2025

 

PBLS Exhibit A - page 1 of 13

 
Exhibit A
         
Asserting Party's 2025 Servicing Platform
         
    Applicable Certification Period
Securitization Transaction   Start Date   End Date
BANK 2022-BNK39   January 01, 2025 to December 31, 2025
BANK 2022-BNK42   January 01, 2025 to December 31, 2025
BANK 2022-BNK44   January 01, 2025 to December 31, 2025
BANK 2023-BNK45   January 01, 2025 to December 31, 2025
BANK 2023-BNK46   January 01, 2025 to December 31, 2025
BANK 2024-BNK47   January 01, 2025 to December 31, 2025
BANK 2024-BNK48   January 01, 2025 to December 31, 2025
BANK5 2023-5YR2   January 01, 2025 to December 31, 2025
BANK5 2023-5YR4   January 01, 2025 to December 31, 2025
BANK5 2024-5YR12   January 01, 2025 to December 31, 2025
BANK5 2024-5YR5   January 01, 2025 to December 31, 2025
BANK5 2024-5YR6   January 01, 2025 to December 31, 2025
BANK5 2024-5YR7   January 01, 2025 to December 31, 2025
BANK5 2025-5YR15   July 15, 2025 to December 31, 2025
BANK5 2025-5YR18   December 09, 2025 to December 31, 2025
BAY 2025-LIVN   May 06, 2025 to December 31, 2025
BBCMS 2017-C1   January 01, 2025 to December 31, 2025
BBCMS 2018-C2   January 01, 2025 to December 31, 2025
BBCMS 2019-BWAY   January 01, 2025 to December 31, 2025
BBCMS 2019-C4   January 01, 2025 to December 31, 2025
BBCMS 2020-C7   January 01, 2025 to December 31, 2025
BBCMS 2021-C11   January 01, 2025 to December 31, 2025
BBCMS 2021-C9   January 01, 2025 to December 31, 2025
BBCMS 2022-C14   January 01, 2025 to December 31, 2025
BBCMS 2022-C16   January 01, 2025 to December 31, 2025
BBCMS 2022-C18   January 01, 2025 to December 31, 2025
BBCMS 2023-5C23   January 01, 2025 to December 31, 2025
BBCMS 2023-C20   January 01, 2025 to December 31, 2025
BBCMS 2024-5C29   January 01, 2025 to December 31, 2025
BBCMS 2024-C26   January 01, 2025 to December 31, 2025
BBCMS 2025-5C36   August 07, 2025 to December 31, 2025
BBCMS 2025-C32   February 12, 2025 to December 31, 2025
BBCMS 2025-C39   December 23, 2025 to December 31, 2025
BCP 2021-330N   January 01, 2025 to December 31, 2025
BDS 2022-FL12   January 01, 2025 to August 19, 2025
BFLD 2020-EYP   January 01, 2025 to December 31, 2025
BFLD 2021-FPM   January 01, 2025 to September 15, 2025
BFLD 2024-VICT   January 01, 2025 to December 31, 2025
BFLD 2024-WRHS   January 01, 2025 to December 31, 2025
BFLD 2025-660F    October 31, 2025 to December 31, 2025
BFLD 2025-FPM   September 12, 2025 to December 31, 2025
BLOX 2021-BLOX   January 01, 2025 to December 31, 2025
BLP 2023-IND   January 01, 2025 to December 31, 2025
BLP 2024-IND2   January 01, 2025 to December 31, 2025

 

PBLS Exhibit A - page 2 of 13

 
Exhibit A
         
Asserting Party's 2025 Servicing Platform
         
    Applicable Certification Period
Securitization Transaction   Start Date   End Date
BLP 2025-IND   March 17, 2025 to December 31, 2025
BMARK 2018-B1   January 01, 2025 to December 31, 2025
BMARK 2018-B3   January 01, 2025 to December 31, 2025
BMARK 2018-B4   January 01, 2025 to December 31, 2025
BMARK 2018-B6   January 01, 2025 to December 31, 2025
BMARK 2018-B7   January 01, 2025 to December 31, 2025
BMARK 2019-B13   January 01, 2025 to December 31, 2025
BMARK 2019-B15   January 01, 2025 to December 31, 2025
BMARK 2019-B9   January 01, 2025 to December 31, 2025
BMARK 2020-B16   January 01, 2025 to December 31, 2025
BMARK 2020-B18   January 01, 2025 to December 31, 2025
BMARK 2020-B21   January 01, 2025 to December 31, 2025
BMARK 2020-IG1   January 01, 2025 to December 31, 2025
BMARK 2021-B23   January 01, 2025 to December 31, 2025
BMARK 2021-B24   January 01, 2025 to December 31, 2025
BMARK 2021-B26   January 01, 2025 to December 31, 2025
BMARK 2021-B27   January 01, 2025 to December 31, 2025
BMARK 2021-B29   January 01, 2025 to December 31, 2025
BMARK 2021-B30   January 01, 2025 to December 31, 2025
BMARK 2022-B33   January 01, 2025 to December 31, 2025
BMARK 2022-B34   January 01, 2025 to December 31, 2025
BMARK 2022-B35   January 01, 2025 to December 31, 2025
BMARK 2022-B36   January 01, 2025 to December 31, 2025
BMARK 2023-B38   January 01, 2025 to December 31, 2025
BMARK 2023-B39   January 01, 2025 to December 31, 2025
BMARK 2023-V3   January 01, 2025 to December 31, 2025
BMARK 2023-V4   January 01, 2025 to December 31, 2025
BMARK 2024-V11   January 01, 2025 to December 31, 2025
BMARK 2024-V12   January 01, 2025 to December 31, 2025
BMARK 2024-V7   January 01, 2025 to December 31, 2025
BMARK 2024-V8   January 01, 2025 to December 31, 2025
BMARK 2024-V9   January 01, 2025 to December 31, 2025
BMARK 2025-B41   September 04, 2025 to December 31, 2025
BMARK 2025-V13   February 19, 2025 to December 31, 2025
BMARK 2025-V14   April 15, 2025 to December 31, 2025
BMARK 2025-V16   August 13, 2025 to December 31, 2025
BMARK 2025-V17   September 29, 2025 to December 31, 2025
BMARK 2025-V18   October 30, 2025 to December 31, 2025
BMARK 2025-V19   December 23, 2025 to December 31, 2025
BMO 2022-C1   January 01, 2025 to December 31, 2025
BMO 2022-C3   January 01, 2025 to December 31, 2025
BMO 2023-C5   January 01, 2025 to December 31, 2025
BMO 2023-C6   January 01, 2025 to December 31, 2025
BMO 2024-5C3   January 01, 2025 to December 31, 2025

 

PBLS Exhibit A - page 3 of 13

 
Exhibit A
         
Asserting Party's 2025 Servicing Platform
         
    Applicable Certification Period
Securitization Transaction   Start Date   End Date
BMO 2024-C10   January 01, 2025 to December 31, 2025
BMO 2024-C9   January 01, 2025 to December 31, 2025
BMO 2025-5C10   May 16, 2025 to December 31, 2025
BMO 2025-5C12   October 09, 2025 to December 31, 2025
BMO 2025-C11   February 28, 2025 to December 31, 2025
BMP 2024-MF23   January 01, 2025 to December 31, 2025
BOCA 2024-BOCA   January 01, 2025 to December 15, 2025
BOCA 2025-BOCA    December 19, 2025 to December 31, 2025
BPR 2021-NRD   January 01, 2025 to December 31, 2025
BPR 2021-TY   January 01, 2025 to December 31, 2025
BPR 2021-WILL   January 01, 2025 to December 31, 2025
BPR 2022-OANA   January 01, 2025 to June 16, 2025
BPR 2022-SSP   January 01, 2025 to December 31, 2025
BPR 2022-STAR   January 01, 2025 to October 15, 2025
BPR 2023-STON   January 01, 2025 to December 31, 2025
BSREP 2021-DC   January 01, 2025 to December 31, 2025
BSTN 2025-HUB   October 17, 2025 to December 31, 2025
BWAY 2021-1450   January 01, 2025 to December 31, 2025
BX 2018-GW   January 01, 2025 to July 15, 2025
BX 2019-OC11   January 01, 2025 to December 31, 2025
BX 2021-21M   January 01, 2025 to December 31, 2025
BX 2021-ACNT   January 01, 2025 to December 31, 2025
BX 2021-IRON   January 01, 2025 to December 31, 2025
BX 2021-LGCY   January 01, 2025 to December 31, 2025
BX 2021-PAC   January 01, 2025 to December 31, 2025
BX 2021-SDMF   January 01, 2025 to December 31, 2025
BX 2021-VINO   January 01, 2025 to July 15, 2025
BX 2021-VOLT   January 01, 2025 to December 15, 2025
BX 2021-XL2   January 01, 2025 to December 31, 2025
BX 2022-FOX2   January 01, 2025 to November 17, 2025
BX 2022-IND   January 01, 2025 to December 31, 2025
BX 2022-LP2   January 01, 2025 to December 31, 2025
BX 2022-PSB   January 01, 2025 to July 15, 2025
BX 2023-XL3   January 01, 2025 to December 31, 2025
BX 2024-BRBK   January 01, 2025 to December 31, 2025
BX 2024-CNYN   January 01, 2025 to December 31, 2025
BX 2024-FNX   January 01, 2025 to December 31, 2025
BX 2024-GPA2   January 01, 2025 to December 31, 2025
BX 2024-GPA3   January 01, 2025 to December 31, 2025
BX 2024-KING   January 01, 2025 to December 31, 2025
BX 2024-MDHS   January 01, 2025 to December 31, 2025
BX 2024-PALM   January 01, 2025 to December 31, 2025
BX 2024-SLCT   January 01, 2025 to December 31, 2025
BX 2024-VLT5   January 01, 2025 to December 31, 2025

 

PBLS Exhibit A - page 4 of 13

 
Exhibit A
         
Asserting Party's 2025 Servicing Platform
         
    Applicable Certification Period
Securitization Transaction   Start Date   End Date
BX 2024-XL4   January 01, 2025 to December 31, 2025
BX 2024-XL5   January 01, 2025 to December 31, 2025
BX 2025-BIO3   February 11, 2025 to December 31, 2025
BX 2025-COPT   August 21, 2025 to December 31, 2025
BX 2025-DIME   February 14, 2025 to December 31, 2025
BX 2025-ROIC   February 27, 2025 to December 31, 2025
BX 2025-VLT6   March 06, 2025 to December 31, 2025
BX 2025-VOLT   December 15, 2025 to December 31, 2025
BXSC 2022-WSS   January 01, 2025 to December 31, 2025
CAMB 2021-CX2   January 01, 2025 to December 31, 2025
Carbon 2019-FL2   January 01, 2025 to December 31, 2025
CCUBS 2017-C1   January 01, 2025 to December 31, 2025
CD 2016-CD1   January 01, 2025 to December 31, 2025
CD 2016-CD2   January 01, 2025 to December 31, 2025
CD 2017-CD3   January 01, 2025 to December 31, 2025
CD 2017-CD4   January 01, 2025 to December 31, 2025
CD 2017-CD5   January 01, 2025 to December 31, 2025
CD 2017-CD6   January 01, 2025 to December 31, 2025
CD 2018-CD7   January 01, 2025 to December 31, 2025
CD 2019-CD8   January 01, 2025 to December 31, 2025
CENT 2023-CITY   January 01, 2025 to July 15, 2025
CENT 2025-CITY   July 22, 2025 to December 31, 2025
CF 2019-CF1   January 01, 2025 to December 31, 2025
CF 2019-CF2   January 01, 2025 to December 31, 2025
CF 2019-CF3   January 01, 2025 to December 31, 2025
CF 2020-P1   January 01, 2025 to December 31, 2025
CFCRE 2016-C3   January 01, 2025 to December 31, 2025
CFCRE 2016-C4   January 01, 2025 to December 31, 2025
CFCRE 2016-C6   January 01, 2025 to December 31, 2025
CFCRE 2016-C7   January 01, 2025 to December 31, 2025
CFCRE 2017-C8   January 01, 2025 to December 31, 2025
CGCMT 2014-GC21   January 01, 2025 to December 31, 2025
CGCMT 2014-GC25   January 01, 2025 to December 31, 2025
CGCMT 2015-GC27   January 01, 2025 to December 31, 2025
CGCMT 2015-GC35   January 01, 2025 to December 31, 2025
CGCMT 2015-P1   January 01, 2025 to December 31, 2025
CGCMT 2016-C1   January 01, 2025 to December 31, 2025
CGCMT 2016-GC37   January 01, 2025 to December 31, 2025
CGCMT 2016-P3   January 01, 2025 to December 31, 2025
CGCMT 2016-P4   January 01, 2025 to December 31, 2025
CGCMT 2016-P5   January 01, 2025 to December 31, 2025
CGCMT 2016-P6   January 01, 2025 to December 31, 2025
CGCMT 2017-C4   January 01, 2025 to December 31, 2025
CGCMT 2017-P7   January 01, 2025 to December 31, 2025

 

PBLS Exhibit A - page 5 of 13

 
Exhibit A
         
Asserting Party's 2025 Servicing Platform
         
    Applicable Certification Period
Securitization Transaction   Start Date   End Date
CGCMT 2018-B2   January 01, 2025 to December 31, 2025
CGCMT 2018-C6   January 01, 2025 to December 31, 2025
CGCMT 2019-GC41   January 01, 2025 to December 31, 2025
CGCMT 2019-GC43   January 01, 2025 to December 31, 2025
CGCMT 2020-GC46   January 01, 2025 to December 31, 2025
CGCMT 2022-GC48   January 01, 2025 to December 31, 2025
CGCMT 2023-SMRT   January 01, 2025 to December 31, 2025
CHI 2025-SFT   March 27, 2025 to December 31, 2025
COAST 2023-2HTL   January 01, 2025 to December 31, 2025
COMM 2012-CCRE4   January 01, 2025 to December 31, 2025
COMM 2012-CCRE5   January 01, 2025 to December 31, 2025
COMM 2012-LC4   January 01, 2025 to December 31, 2025
COMM 2013-CCRE10   January 01, 2025 to December 31, 2025
COMM 2013-CCRE11   January 01, 2025 to December 31, 2025
COMM 2013-CCRE12   January 01, 2025 to December 31, 2025
COMM 2013-CCRE6   January 01, 2025 to December 31, 2025
COMM 2013-CCRE7   January 01, 2025 to December 31, 2025
COMM 2013-CCRE8   January 01, 2025 to December 31, 2025
COMM 2013-CCRE9   January 01, 2025 to December 31, 2025
COMM 2013-LC13   January 01, 2025 to December 31, 2025
COMM 2013-LC6   January 01, 2025 to December 31, 2025
COMM 2014-CCRE14   January 01, 2025 to December 31, 2025
COMM 2014-CCRE15   January 01, 2025 to December 31, 2025
COMM 2014-CCRE16   January 01, 2025 to December 31, 2025
COMM 2014-CCRE17   January 01, 2025 to December 31, 2025
COMM 2014-CCRE18   January 01, 2025 to December 31, 2025
COMM 2014-CCRE19   January 01, 2025 to December 31, 2025
COMM 2014-CCRE20   January 01, 2025 to December 31, 2025
COMM 2014-CCRE21   January 01, 2025 to December 31, 2025
COMM 2014-LC15   January 01, 2025 to December 31, 2025
COMM 2014-LC17   January 01, 2025 to December 31, 2025
COMM 2014-UBS2   January 01, 2025 to December 31, 2025
COMM 2014-UBS3   January 01, 2025 to December 31, 2025
COMM 2014-UBS4   January 01, 2025 to December 31, 2025
COMM 2014-UBS5   January 01, 2025 to December 31, 2025
COMM 2015-CCRE22   January 01, 2025 to December 31, 2025
COMM 2015-CCRE24   January 01, 2025 to December 31, 2025
COMM 2015-CCRE26   January 01, 2025 to December 31, 2025
COMM 2015-CCRE27   January 01, 2025 to December 31, 2025
COMM 2015-DC1   January 01, 2025 to December 31, 2025
COMM 2015-LC19   January 01, 2025 to December 31, 2025
COMM 2015-LC21   January 01, 2025 to December 31, 2025
COMM 2015-LC23   January 01, 2025 to December 31, 2025
COMM 2015-PC1   January 01, 2025 to December 31, 2025

 

PBLS Exhibit A - page 6 of 13

 
Exhibit A
         
Asserting Party's 2025 Servicing Platform
         
    Applicable Certification Period
Securitization Transaction   Start Date   End Date
COMM 2016-667M   January 01, 2025 to December 31, 2025
COMM 2016-CCRE28   January 01, 2025 to December 31, 2025
COMM 2016-COR1   January 01, 2025 to December 31, 2025
COMM 2016-DC2   January 01, 2025 to December 31, 2025
COMM 2017-COR2   January 01, 2025 to December 31, 2025
COMM 2018-5BP   January 01, 2025 to December 15, 2025
COMM 2018-COR3   January 01, 2025 to December 31, 2025
COMM 2018-HOME   January 01, 2025 to December 31, 2025
COMM 2019-GC44   January 01, 2025 to December 31, 2025
COMM 2020-CX   January 01, 2025 to December 31, 2025
COMM 2021-2400   January 01, 2025 to December 31, 2025
COMM 2022-HC   January 01, 2025 to December 31, 2025
COMM 2024-277P   January 01, 2025 to December 31, 2025
COMM 2024-CBM   January 01, 2025 to December 31, 2025
COMM 2024-WCL1   January 01, 2025 to December 31, 2025
COMM 2025-180W   August 05, 2025 to December 31, 2025
COMM 2025-SBX   August 01, 2025 to December 31, 2025
CSAIL 2015-C1   January 01, 2025 to December 31, 2025
CSAIL 2015-C2   January 01, 2025 to December 31, 2025
CSAIL 2016-C6   January 01, 2025 to December 31, 2025
CSAIL 2016-C7   January 01, 2025 to December 31, 2025
CSAIL 2017-C8   January 01, 2025 to December 31, 2025
CSAIL 2017-CX10   January 01, 2025 to December 31, 2025
CSAIL 2018-CX11   January 01, 2025 to December 31, 2025
CSAIL 2018-CX12   January 01, 2025 to December 31, 2025
CSAIL 2019-C15   January 01, 2025 to December 31, 2025
CSAIL 2019-C17   January 01, 2025 to December 31, 2025
CSAIL 2020-C19   January 01, 2025 to December 31, 2025
CSAIL 2021-C20   January 01, 2025 to December 31, 2025
CSMC 2016-NXSR   January 01, 2025 to December 31, 2025
CSMC 2017-CALI   January 01, 2025 to December 31, 2025
CSMC 2017-CHOP   January 01, 2025 to December 31, 2025
CSMC 2017-PFHP   January 01, 2025 to December 31, 2025
CSMC 2019-UVIL   January 01, 2025 to December 31, 2025
CSMC 2020-FACT   January 01, 2025 to December 31, 2025
CSMC 2021-B33   January 01, 2025 to December 31, 2025
CSMC 2021-BHAR   January 01, 2025 to December 31, 2025
CSTL 2024-GATE   January 01, 2025 to December 31, 2025
CSTL 2025-GATE2   November 12, 2025 to December 31, 2025
DAFC 2017-AMO   January 01, 2025 to December 31, 2025
DATA 2023-CNTR   January 01, 2025 to December 31, 2025
DBC 2025-DBC   October 29, 2025 to December 31, 2025
DBGS 2018-BIOD   January 01, 2025 to April 15, 2025
DBGS 2018-C1   January 01, 2025 to December 31, 2025

 

PBLS Exhibit A - page 7 of 13

 
Exhibit A
         
Asserting Party's 2025 Servicing Platform
         
    Applicable Certification Period
Securitization Transaction   Start Date   End Date
DBGS 2024-ALTA   January 01, 2025 to December 31, 2025
DBGS 2024-SBL   January 01, 2025 to December 31, 2025
DBJPM 2016-C1   January 01, 2025 to December 31, 2025
DBJPM 2016-C3   January 01, 2025 to December 31, 2025
DBJPM 2020-C9   January 01, 2025 to December 31, 2025
DBWF 2024-LCRS   January 01, 2025 to December 31, 2025
DC 2023-DC   January 01, 2025 to December 31, 2025
DC 2024-HLTN   January 01, 2025 to December 31, 2025
DK 2024-SPBX   January 01, 2025 to December 31, 2025
DOLP 2021-NYC   January 01, 2025 to December 31, 2025
DURST 2025-151   August 19, 2025 to December 31, 2025
ELM 2024-ELM   January 01, 2025 to December 31, 2025
ELP 2021-ELP   January 01, 2025 to December 31, 2025
ELP 2025-ELP   November 20, 2025 to December 31, 2025
EQUS 2021-EQAZ   January 01, 2025 to December 31, 2025
ESA 2021-ESH   January 01, 2025 to October 15, 2025
FIVE 2023-V1   January 01, 2025 to December 31, 2025
FMBT 2024-FBLU   January 01, 2025 to December 31, 2025
FREMF SCR 2016-MDN1   January 01, 2025 to December 31, 2025
FREMF SCR 2016-MDN2   January 01, 2025 to December 31, 2025
FREMF SCR 2017-MDN3   January 01, 2025 to December 31, 2025
GFH 2025-IND   June 28, 2025 to December 31, 2025
GPMT 2021-FL3   January 01, 2025 to December 31, 2025
Grace Trust 2020-GRCE   January 01, 2025 to December 31, 2025
GSAT 2025-BMF   July 15, 2025 to December 31, 2025
GSJP 2025-BEDS   December 18, 2025 to December 31, 2025
GSMS 2013-GCJ12   January 01, 2025 to December 31, 2025
GSMS 2013-GCJ16   January 01, 2025 to December 31, 2025
GSMS 2015-GC32   January 01, 2025 to December 31, 2025
GSMS 2016-GS4   January 01, 2025 to December 31, 2025
GSMS 2017-GS7   January 01, 2025 to December 31, 2025
GSMS 2018-3PCK   January 01, 2025 to December 31, 2025
GSMS 2018-GS10   January 01, 2025 to December 31, 2025
GSMS 2019-GC39   January 01, 2025 to December 31, 2025
GSMS 2019-GC42   January 01, 2025 to December 31, 2025
GSMS 2019-GSA1   January 01, 2025 to December 31, 2025
GSMS 2020-GC47   January 01, 2025 to December 31, 2025
GSMS 2021-DM   January 01, 2025 to October 15, 2025
GSMS 2021-IP   January 01, 2025 to October 15, 2025
GSMS 2023-SHIP   January 01, 2025 to December 31, 2025
GSMS 2024-FAIR   January 01, 2025 to December 31, 2025
HGMT 2025-HGLR   February 13, 2025 to December 31, 2025
HHT 2025-MAUI   March 21, 2025 to December 31, 2025
HIG 2023-FL1   January 01, 2025 to November 20, 2025

 

PBLS Exhibit A - page 8 of 13

 
Exhibit A
         
Asserting Party's 2025 Servicing Platform
         
    Applicable Certification Period
Securitization Transaction   Start Date   End Date
HILT 2024-ORL   January 01, 2025 to December 31, 2025
HIT 2022-HI32   January 01, 2025 to December 31, 2025
HONO 2021-LULU   January 01, 2025 to December 31, 2025
ICNQ 2024-MF   January 01, 2025 to December 31, 2025
ILPT 2019-SURF   January 01, 2025 to December 31, 2025
ILPT 2022-LPF2   January 01, 2025 to July 15, 2025
ILPT 2022-LPFX   January 01, 2025 to December 31, 2025
ILPT 2025-LPF2   June 27, 2025 to December 31, 2025
JPMCC 2013-C10   January 01, 2025 to December 31, 2025
JPMCC 2018-AON   January 01, 2025 to December 31, 2025
JPMCC 2018-ASH8   January 01, 2025 to December 31, 2025
JPMCC 2018-MINN   January 01, 2025 to December 31, 2025
JPMCC 2018-PHH   January 01, 2025 to December 31, 2025
JPMCC 2018-PTC   January 01, 2025 to December 31, 2025
JPMCC 2018-WPT   January 01, 2025 to December 31, 2025
JPMCC 2019-ICON   January 01, 2025 to December 31, 2025
JPMCC 2019-OSB   January 01, 2025 to December 31, 2025
JPMCC 2020-609M   January 01, 2025 to August 15, 2025
JPMCC 2020-LOOP   January 01, 2025 to December 31, 2025
JPMCC 2021-1MEM   January 01, 2025 to December 31, 2025
JPMCC 2021-2NU   January 01, 2025 to December 31, 2025
JPMCC 2021-410T   January 01, 2025 to December 31, 2025
JPMCC 2022-NLP   January 01, 2025 to December 31, 2025
JPMCC 2025-BHR5   March 17, 2025 to December 31, 2025
JPMDB 2017-C5   January 01, 2025 to December 31, 2025
KIND 2024-1   January 01, 2025 to December 31, 2025
KNDR 2021-KIND   January 01, 2025 to December 31, 2025
KRE 2025-AIP4   March 18, 2025 to December 31, 2025
LAQ 2023-LAQ   January 01, 2025 to December 31, 2025
LCCM 2017-LC26   January 01, 2025 to December 31, 2025
LEX 2024-BBG   January 01, 2025 to December 31, 2025
LIFE 2021-BMR   January 01, 2025 to December 31, 2025
LIFE 2022-BMR2   January 01, 2025 to December 31, 2025
LUX 2023-LION   January 01, 2025 to December 31, 2025
LV 2024-SHOW   January 01, 2025 to December 31, 2025
Manhattan West 2020-1MW   January 01, 2025 to December 31, 2025
MCR 2024-HTL   January 01, 2025 to December 31, 2025
MED 2024-MOB   January 01, 2025 to December 31, 2025
MHC 2021-MHC   January 01, 2025 to December 31, 2025
MHC 2021-MHC2   January 01, 2025 to December 15, 2025
MHP 2021-STOR   January 01, 2025 to December 31, 2025
MHP 2022-MHIL   January 01, 2025 to December 31, 2025
MHP 2025-MHIL2   August 28, 2025 to December 31, 2025
MILE 2025-STNE   July 15, 2025 to December 31, 2025

 

PBLS Exhibit A - page 9 of 13

 
Exhibit A
         
Asserting Party's 2025 Servicing Platform
         
    Applicable Certification Period
Securitization Transaction   Start Date   End Date
MIRA 2023-MILE   January 01, 2025 to December 31, 2025
MRCD 2019-PARK   January 01, 2025 to December 31, 2025
MSBAM 2012-C5   January 01, 2025 to December 31, 2025
MSBAM 2013-C10   January 01, 2025 to December 31, 2025
MSBAM 2013-C13   January 01, 2025 to December 31, 2025
MSBAM 2014-C14   January 01, 2025 to December 31, 2025
MSBAM 2014-C18   January 01, 2025 to December 31, 2025
MSBAM 2014-C19   January 01, 2025 to December 31, 2025
MSBAM 2015-C20   January 01, 2025 to December 31, 2025
MSBAM 2015-C22   January 01, 2025 to December 31, 2025
MSBAM 2015-C24   January 01, 2025 to December 31, 2025
MSBAM 2015-C26   January 01, 2025 to December 31, 2025
MSBAM 2016-C28   January 01, 2025 to December 31, 2025
MSBAM 2016-C29   January 01, 2025 to December 31, 2025
MSBAM 2016-C30   January 01, 2025 to December 31, 2025
MSBAM 2016-C31   January 01, 2025 to December 31, 2025
MSBAM 2016-C32   January 01, 2025 to December 31, 2025
MSBAM 2017-C33   January 01, 2025 to December 31, 2025
MSBAM 2017-C34   January 01, 2025 to December 31, 2025
MSBAM 2025-5C2   November 13, 2025 to December 31, 2025
MSBAM 2025-C35   August 14, 2025 to December 31, 2025
MSC 2015-MS1   January 01, 2025 to December 31, 2025
MSC 2015-UBS8   January 01, 2025 to December 31, 2025
MSC 2016-BNK2   January 01, 2025 to December 31, 2025
MSC 2016-UBS11   January 01, 2025 to December 31, 2025
MSC 2016-UBS12   January 01, 2025 to December 31, 2025
MSC 2017-ASHF   January 01, 2025 to December 31, 2025
MSC 2017-HR2   January 01, 2025 to December 31, 2025
MSC 2018-H3   January 01, 2025 to December 31, 2025
MSC 2018-H4   January 01, 2025 to December 31, 2025
MSC 2019-H6   January 01, 2025 to December 31, 2025
MSC 2019-L3   January 01, 2025 to December 31, 2025
MSC 2019-PLND   January 01, 2025 to December 31, 2025
MSC 2020-HR8   January 01, 2025 to December 31, 2025
MSC 2021-ILP   January 01, 2025 to July 15, 2025
MSC 2021-L6   January 01, 2025 to December 31, 2025
MSC 2022-L8   January 01, 2025 to December 31, 2025
MSC 2024-BPR2   January 01, 2025 to December 31, 2025
MSCI 2016-UBS9   January 01, 2025 to December 31, 2025
MSSG 2017-237P   January 01, 2025 to December 31, 2025
MTK 2021-GRNY   January 01, 2025 to April 15, 2025
MTN 2022-LPFL   January 01, 2025 to December 31, 2025
NCMF 2022-MFP   January 01, 2025 to June 16, 2025
NCMF 2025-MFS   June 11, 2025 to December 31, 2025

 

PBLS Exhibit A - page 10 of 13

 
Exhibit A
         
Asserting Party's 2025 Servicing Platform
         
    Applicable Certification Period
Securitization Transaction   Start Date   End Date
NCMS 2019-AMZ7B   January 01, 2025 to December 31, 2025
NRTH 2025-PARK   October 15, 2025 to December 31, 2025
NXPT 2024-STOR   January 01, 2025 to December 31, 2025
NYC 2024-3ELV   January 01, 2025 to December 31, 2025
NYO 2021-1290   January 01, 2025 to December 31, 2025
OBPT 2019-OBP   January 01, 2025 to December 31, 2025
OMPT 2017-1MKT   January 01, 2025 to December 31, 2025
ONE 2021-PARK   January 01, 2025 to December 31, 2025
ONNI 2024-APT   January 01, 2025 to December 31, 2025
ONYP 2020-1NYP   January 01, 2025 to December 31, 2025
OPG 2021-PORT   January 01, 2025 to April 15, 2025
ORL 2024-GLKS   January 01, 2025 to December 31, 2025
PFP 2023-10   January 01, 2025 to August 18, 2025
PRK 2017-280P   January 01, 2025 to December 31, 2025
PRM 2025-PRM6   June 24, 2025 to December 31, 2025
RCMF 2021-FL5   January 01, 2025 to March 25, 2025
RCMF 2021-FL6   January 01, 2025 to March 25, 2025
RCMF 2021-FL7   January 01, 2025 to December 31, 2025
RCMF 2022-FL10   January 01, 2025 to June 25, 2025
RCMF 2022-FL8   January 01, 2025 to March 25, 2025
RCMF 2022-FL9   January 01, 2025 to June 25, 2025
RCMF 2023-FL11   January 01, 2025 to December 31, 2025
RCMF 2023-FL12   January 01, 2025 to December 31, 2025
RIAL 2022-FL8   January 01, 2025 to July 21, 2025
RIDE 2025-SHRE   February 21, 2025 to December 31, 2025
RLGH 2021-TROT   January 01, 2025 to July 15, 2025
SBALR 2020-RR1   January 01, 2025 to December 31, 2025
SCG 2024-MSP   January 01, 2025 to December 31, 2025
SCG 2025-FLWR   August 19, 2025 to December 31, 2025
SCOTT 2023-SFS   January 01, 2025 to December 31, 2025
SELF 2024-STRG   January 01, 2025 to December 31, 2025
SFO 2021-555   January 01, 2025 to December 31, 2025
SGCMS 2016-C5   January 01, 2025 to December 31, 2025
SGCP 2021-FL3   January 01, 2025 to December 31, 2025
SGCP 2022-FL4   January 01, 2025 to December 31, 2025
SGCP 2023-FL5   January 01, 2025 to December 31, 2025
SMR 2022-IND   January 01, 2025 to December 31, 2025
SMRT 2022-MINI   January 01, 2025 to December 31, 2025
SPGN 2022-TFLM   January 01, 2025 to December 31, 2025
SREIT 2021-FLWR   January 01, 2025 to December 31, 2025
SREIT 2021-MFP   January 01, 2025 to December 31, 2025
SREIT 2021-MFP2   January 01, 2025 to December 31, 2025
STWD 2021-HTS   January 01, 2025 to December 31, 2025
SWCH 2025-DATA   February 18, 2025 to December 31, 2025

 

PBLS Exhibit A - page 11 of 13

 
Exhibit A
         
Asserting Party's 2025 Servicing Platform
         
    Applicable Certification Period
Securitization Transaction   Start Date   End Date
TCO 2024-DPM   January 01, 2025 to December 31, 2025
THPT 2023-THL   January 01, 2025 to December 31, 2025
UBS 2017-C2   January 01, 2025 to December 31, 2025
UBS 2017-C3   January 01, 2025 to December 31, 2025
UBS 2017-C5   January 01, 2025 to December 31, 2025
UBS 2018-C10   January 01, 2025 to December 31, 2025
UBS 2018-C12   January 01, 2025 to December 31, 2025
UBS 2018-C14   January 01, 2025 to December 31, 2025
UBS 2018-C8   January 01, 2025 to December 31, 2025
UBS 2019-C16   January 01, 2025 to December 31, 2025
UBS 2019-C18   January 01, 2025 to December 31, 2025
UBSBB 2012-C3   January 01, 2025 to January 13, 2025
UBSBB 2013-C6   January 01, 2025 to December 31, 2025
UNIV 2025-APTS   November 25, 2025 to December 31, 2025
VASA 2021-VASA   January 01, 2025 to December 31, 2025
VDCM 2025-AZ   July 10, 2025 to December 31, 2025
VLS 2020-LAB   January 01, 2025 to December 31, 2025
WBHT 2019-WBM   January 01, 2025 to June 16, 2025
WBRK 2025-WBRK   March 06, 2025 to December 31, 2025
WEST 2025-ROSE   March 28, 2025 to December 31, 2025
WFCM 2013-LC12   January 01, 2025 to December 31, 2025
WFCM 2014-LC18   January 01, 2025 to December 31, 2025
WFCM 2015-LC22   January 01, 2025 to December 31, 2025
WFCM 2016-BNK1   January 01, 2025 to December 31, 2025
WFCM 2016-C33   January 01, 2025 to December 31, 2025
WFCM 2016-C36   January 01, 2025 to December 31, 2025
WFCM 2016-NXS5   January 01, 2025 to December 31, 2025
WFCM 2017-C38   January 01, 2025 to December 31, 2025
WFCM 2017-C42   January 01, 2025 to December 31, 2025
WFCM 2018-C43   January 01, 2025 to December 31, 2025
WFCM 2018-C45   January 01, 2025 to December 31, 2025
WFCM 2018-C47   January 01, 2025 to December 31, 2025
WFCM 2019-C50   January 01, 2025 to December 31, 2025
WFCM 2019-C53   January 01, 2025 to December 31, 2025
WFCM 2019-C54   January 01, 2025 to December 31, 2025
WFCM 2020-C55   January 01, 2025 to December 31, 2025
WFCM 2022-C62   January 01, 2025 to December 31, 2025
WFCM 2022-JS2   January 01, 2025 to December 31, 2025
WFCM 2022-ONL   January 01, 2025 to December 31, 2025
WFCM 2024-C63   January 01, 2025 to December 31, 2025
WFCM 2024-MGP   January 01, 2025 to December 15, 2025
WFCM 2025-5C5   July 30, 2025 to December 31, 2025
WFCM 2025-5C6   October 08, 2025 to December 31, 2025
WFCM 2025-AURA   October 15, 2025 to December 31, 2025

 

PBLS Exhibit A - page 12 of 13

 
Exhibit A
         
Asserting Party's 2025 Servicing Platform
         
    Applicable Certification Period
Securitization Transaction   Start Date   End Date
WFCM 2025-C64   February 27, 2025 to December 31, 2025
WFCM 2025-DWHP   April 23, 2025 to December 31, 2025
WHARF 2025-DC   June 26, 2025 to December 31, 2025
WPT 2017-WWP   January 01, 2025 to December 31, 2025
WSTN 2023-MAUI   January 01, 2025 to December 31, 2025

 

PBLS Exhibit A - page 13 of 13

 

EXHIBIT B

SERVICING CRITERIA APPLICABLE
SERVICING CRITERIA
INAPPLICABLE
SERVICING
CRITERIA

Regulation AB
Reference

Criterion Performed Directly by PBLS1 Performed by Vendor(s) for which PBLS is the Responsible Party Performed by subservicer(s) or vendor(s) for which PBLS is NOT the Responsible Party NOT performed by PBLS or by subservicer(s) or vendor(s) retained by PBLS2
  General Servicing Considerations        
1122(d)(1)(i) Policies and procedures are instituted to monitor any performance or other triggers and events of default in accordance with the transaction agreements.       X
1122(d)(1)(ii) If any material servicing activities are outsourced to third parties, policies and procedures are instituted to monitor the third party’s performance and compliance with such servicing activities.       X
1122(d)(1)(iii) Any requirements in the transaction agreements to maintain a back-up servicer for the pool assets are maintained.       X
1122(d)(1)(iv) A fidelity bond and errors and omissions policy is in effect on the party participating in the servicing function throughout the reporting period in the amount of coverage required by and otherwise in accordance with the terms of the transaction agreements.       X
1122(d)(1)(v) Aggregation of information, as applicable, is mathematically accurate and the information conveyed accurately reflects the information.       X
  Cash Collection and Administration        
1122(d)(2)(i) Payments on pool assets are deposited into the appropriate custodial bank accounts and related bank clearing accounts no more than two business days following receipt, or such other number of days specified in the transaction agreements.       X
1122(d)(2)(ii) Disbursements made via wire transfer on behalf of an obligor or to an investor are made only by authorized personnel.       X
1122(d)(2)(iii) Advances of funds or guarantees regarding collections, cash flows or distributions, and any interest or other fees charged for such advances, are made, reviewed and approved as specified in the transaction agreements.       X
1122(d)(2)(iv) The related accounts for the transaction, such as cash reserve accounts or accounts established as a form of overcollateralization, are separately maintained (e.g., with respect to commingling of cash) as set forth in the transaction agreements.       X
1122(d)(2)(v) Each custodial account is maintained at a federally insured depository institution as set forth in the transaction agreements. For purposes of this criterion, “federally insured depository institution” with respect to a foreign financial institution means a foreign financial institution that meets the requirements of Rule 13k-1(b)(1) of the Securities Exchange Act.       X
1122(d)(2)(vi) Unissued checks are safeguarded so as to prevent unauthorized access.       X

 

Park Bridge Lender Services LLC Exhibit B – page 1 of 5
 

 

SERVICING CRITERIA APPLICABLE
SERVICING CRITERIA
INAPPLICABLE
SERVICING
CRITERIA

Regulation AB
Reference

Criterion Performed Directly by PBLS1 Performed by Vendor(s) for which PBLS is the Responsible Party Performed by subservicer(s) or vendor(s) for which PBLS is NOT the Responsible Party NOT performed by PBLS or by subservicer(s) or vendor(s) retained by PBLS2
1122(d)(2)(vii) Reconciliations are prepared on a monthly basis for all asset-backed securities related bank accounts, including custodial accounts and related bank clearing accounts. These reconciliations are (A) mathematically accurate; (B) prepared within 30 calendar days after the bank statement cutoff date, or such other number of days specified in the transaction agreements; (C) reviewed and approved by someone other than the person who prepared the reconciliation; and (D) contain explanations for reconciling items. These reconciling items are resolved within 90 calendar days of their original identification, or such other number of days specified in the transaction agreements.       X
  Investor Remittances and Reporting        
1122(d)(3)(i)(A) Reports to investors, including those to be filed with the Commission, are maintained in accordance with the transaction agreements and applicable Commission requirements. Specifically, such reports are prepared in accordance with timeframes and other terms set forth in the transaction agreements. X      
1122(d)(3)(i)(B) Reports to investors, including those to be filed with the Commission, are maintained in accordance with the transaction agreements and applicable Commission requirements. Specifically, such reports provide information calculated in accordance with the terms specified in the transaction agreements. X      
1122(d)(3)(i)(C) Reports to investors, including those to be filed with the Commission, are maintained in accordance with the transaction agreements and applicable Commission requirements. Specifically, such reports are filed with the Commission as required by its rules and regulations. X3     X4
1122(d)(3)(i)(D) Reports to investors, including those to be filed with the Commission, are maintained in accordance with the transaction agreements and applicable Commission requirements. Specifically, such reports agree with investors’ or the trustee’s records as to the total unpaid principal balance and number of pool assets serviced by the Servicer. X3     X4
1122(d)(3)(ii) Amounts due to investors are allocated and remitted in accordance with timeframes, distribution priority and other terms set forth in the transaction agreements.       X
1122(d)(3)(iii) Disbursements made to an investor are posted within two business days to the Servicer’s investor records, or such other number of days specified in the transaction agreements.       X
1122(d)(3)(iv) Amounts remitted to investors per the investor reports agree with cancelled checks, or other form of payment, or custodial bank statements.       X

 

Park Bridge Lender Services LLC Exhibit B – page 2 of 5
 

 

SERVICING CRITERIA APPLICABLE
SERVICING CRITERIA
INAPPLICABLE
SERVICING
CRITERIA

Regulation AB

Reference

Criterion Performed Directly by PBLS1 Performed by Vendor(s) for which PBLS is the Responsible Party Performed by subservicer(s) or vendor(s) for which PBLS is NOT the Responsible Party NOT performed by PBLS or by subservicer(s) or vendor(s) retained by PBLS2
  Pool Asset Administration        
1122(d)(4)(i) Collateral or security on pool assets is maintained as required by the transaction agreements or related mortgage loan documents.       X
1122(d)(4)(ii) Pool asset and related documents are safeguarded as required by the transaction agreements.       X
1122(d)(4)(iii) Any additions, removals or substitutions to the asset pool are made, reviewed and approved in accordance with any conditions or requirements in the transaction agreements.       X
1122(d)(4)(iv) Payments on pool assets, including any payoffs, made in accordance with the related pool asset documents are posted to the Servicer’s obligor records maintained no more than two business days after receipt, or such other number of days specified in the transaction agreements, and allocated to principal, interest or other items (e.g., escrow) in accordance with the related pool asset documents.       X
1122(d)(4)(v) The Servicer’s records regarding the pool assets agree with the Servicer’s records with respect to an obligor’s unpaid principal balance.       X
1122(d)(4)(vi) Changes with respect to the terms or status of an obligor's pool assets (e.g., loan modifications or re-agings) are made, reviewed and approved by authorized personnel in accordance with the transaction agreements and related pool asset documents.       X
1122(d)(4)(vii) Loss mitigation or recovery actions (e.g., forbearance plans, modifications and deeds in lieu of foreclosure, foreclosures and repossessions, as applicable) are initiated, conducted and concluded in accordance with the timeframes or other requirements established by the transaction agreements. X      
1122(d)(4)(viii) Records documenting collection efforts are maintained during the period a pool asset is delinquent in accordance with the transaction agreements. Such records are maintained on at least a monthly basis, or such other period specified in the transaction agreements, and describe the entity’s activities in monitoring delinquent pool assets including, for example, phone calls, letters and payment rescheduling plans in cases where delinquency is deemed temporary (e.g., illness or unemployment).       X
1122(d)(4)(ix) Adjustments to interest rates or rates of return for pool assets with variable rates are computed based on the related pool asset documents.       X

 

Park Bridge Lender Services LLC Exhibit B – page 3 of 5
 

 

SERVICING CRITERIA APPLICABLE
SERVICING CRITERIA
INAPPLICABLE
SERVICING
CRITERIA

Regulation AB

Reference

Criterion Performed Directly by PBLS1 Performed by Vendor(s) for which PBLS is the Responsible Party Performed by subservicer(s) or vendor(s) for which PBLS is NOT the Responsible Party NOT performed by PBLS or by subservicer(s) or vendor(s) retained by PBLS2
1122(d)(4)(x) Regarding any funds held in trust for an obligor (such as escrow accounts): (A) such funds are analyzed, in accordance with the obligor’s pool asset documents, on at least an annual basis, or such other period specified in the transaction agreements; (B) interest on such funds is paid, or credited, to obligors in accordance with applicable pool asset documents and state laws; and (C) such funds are returned to the obligor within 30 calendar days of full repayment of the related pool assets, or such other number of days specified in the transaction agreements.       X
1122(d)(4)(xi) Payments made on behalf of an obligor (such as tax or insurance payments) are made on or before the related penalty or expiration dates, as indicated on the appropriate bills or notices for such payments, provided that such support has been received by the Servicer at least 30 calendar days prior to these dates, or such other number of days specified in the transaction agreements.       X
1122(d)(4)(xii) Any late payment penalties in connection with any payment to be made on behalf of an obligor are paid from the Servicer’s funds and not charged to the obligor, unless the late payment was due to the obligor’s error or omission.       X
1122(d)(4)(xiii) Disbursements made on behalf of an obligor are posted within two business days to the obligor’s records maintained by the Servicer, or such other number of days specified in the transaction agreements.       X
1122(d)(4)(xiv) Delinquencies, charge-offs and uncollectible accounts are recognized and recorded in accordance with the transaction agreements.       X
1122(d)(4)(xv) Any external enhancement or other support, identified in Item 1114(a)(1) through (3) or Item 1115 of Regulation AB, is maintained as set forth in the transaction agreements.       X

 

Remainder of page left blank intentionally

 

Park Bridge Lender Services LLC Exhibit B – page 4 of 5
 

1The criteria in the columns “Applicable Servicing Criteria” and marked with an “X” are applicable for the Transactions unless otherwise noted. If there were no specially serviced loans under the related Transactions during the reporting period, then no trust advisor, senior trust advisor or operating advisor actions were required.
2The criteria in the columns “Inapplicable Servicing Criteria” and marked with an “X” were not within the scope of the Asserting Party’s duties in the Transactions.
3Applicable only to the Transactions listed in Table 2 below.
4Not applicable to Transactions other than the Transactions listed in Table 2 below.

Table 2

COMM 2012-LC4
COMM 2012 CCRE4
COMM 2012-CCRE5
COMM 2013-CCRE7
COMM 2013-CCRE9
COMM 2013-LC6
COMM 2013-LC13
COMM 2013-CCRE11
MSBAM 2012-C5

 

 