Environmental expenses for the years ended December 31, 2017, 2016 and 2015, are as follows:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

12-31-2017

 

Company Incurring the Cost

Name

Project

 

Project Status (Finished, In progress)

 

Total Disbursements

ThCh$

 

 

Amounts Capitalized

ThCh$

 

 

Expenses

ThCh$

 

 

Disbursement amount in the future

ThCh$

 

 

Estimated future disbursement date

ThCh$

 

Total Disbursements

ThCh$

 

Pehuenche

Hydroelectric Central Environmental Expenditures

Studies, monitoring, laboratory analysis, removal and final disposal of solid waste at hydroelectric power stations (HPS), thermoelectric power stations and combine cycle power stations.

 

In progress

 

 

6,786

 

 

 

-

 

 

 

6,786

 

 

 

-

 

 

 

 

 

6,787

 

Enel Distribución Chile S.A.

 

 

Vegetation Control In Redesat

This activity contemplates the maintenance of the band of easement of high voltage lines between 34,5 y 500kv.

 

In progress

 

 

306,419

 

 

 

-

 

 

 

306,419

 

 

 

-

 

 

31/12/2017

 

 

306,419

 

Management Respel

Dangerous waste management

 

Finished

 

 

265

 

 

 

-

 

 

 

265

 

 

 

-

 

 

30/09/2017

 

 

265

 

Environmental management in Ssee

Tree maintenance of SSEE and removal of brush, debris and garbage, outer perimeter.

 

In progress

 

 

239,285

 

 

 

-

 

 

 

239,285

 

 

 

18,644

 

 

 

 

 

257,929

 

 

Consider all the environmental work that is done inside and outside of SSEE, as fumigation, placement and/or repair of rodent baits, irrigation system repair, waste removal, environmental inspections, garden

 

Finished

 

 

46,771

 

 

 

-

 

 

 

46,771

 

 

 

-

 

 

31/12/2017

 

 

46,771

 

Improvements in the Network M T/Bt

Traditional network replacement by protected, concentric, other

 

Finished

 

 

3,066,846

 

 

 

3,066,846

 

 

 

-

 

 

 

1,957,246

 

 

30/09/2017

 

 

5,024,092

 

Environmental Permits

Baseline for Environmental Impact Study, execution RCA and normative, preparation of reports and sectoral permits.

 

In progress

 

 

68,001

 

 

 

68,001

 

 

 

-

 

 

 

34,811

 

 

31/03/2018

 

 

102,812

 

Vegetation Control in Networks Mt/Bt

Pruning of trees near the media network and low voltage.

 

In progress

 

 

3,313,454

 

 

 

-

 

 

 

3,313,454

 

 

 

-

 

 

31/12/2017

 

 

3,313,454

 

Noise Control

Noise measurement and electromagnetic fields in substation, lines and other facilities.

 

In progress

 

 

786

 

 

 

-

 

 

 

786

 

 

 

-

 

 

31/12/2017

 

 

786

 

Asbestos Removal from Underground Cables

Removal of fireproof tape with asbestos from the underground network MT.

 

In progress

 

 

166,434

 

 

 

166,434

 

 

 

-

 

 

 

37,290

 

 

31/12/2017

 

 

203,724

 

Arborizations of Substations and Sat Line

Forest management plans, reforestations, construction and maintenance of tree-lined belts in substation.

 

In progress

 

 

251,740

 

 

 

251,740

 

 

 

-

 

 

 

20,390

 

 

31/12/2017

 

 

272,130

 

Gas Atacama Chile

 

Environmental monitoring

Environmental monitoring with SK Ecología operation and maintenance CEMS.

 

In progress

 

 

1,463,204

 

 

 

-

 

 

 

1,463,204

 

 

 

-

 

 

 

 

 

1,463,204

 

Standardization Cems

Normalización bodegas, gestión ambiental.

 

In progress

 

 

1,021,630

 

 

 

1,021,630

 

 

 

-

 

 

 

-

 

 

 

 

 

1,021,630

 

Eolica Canela

Environmental expenditures in power plants

Water quality analysis and monitoring and Higenization Canela

 

In progress

 

 

18,347

 

 

 

-

 

 

 

18,347

 

 

 

-

 

 

 

 

 

18,347

 

Enel Generación Chile S.A.

Environmental costs in combined cycle plants

The main expenses incurred are: Bocamina U1-2: Operation and maintenance, monitoring stations air quality and meteorology,

Environmental audit monitoring network 1 per year. Annual Validation CEMS, Protocol Service Biomasa Environmental Materials (magazine, books)

Isokinetic Measurements. Jobs SGI (Objetive NC, inspections, audits and fizcalization) ISO 14001, certification OHSAS, Operation and Maintenance Service CEMS.

 

In progress

 

 

1,252,355

 

 

 

-

 

 

 

1,252,355

 

 

 

-

 

 

 

 

 

1,252,355

 

Environmental costs in thermal plants

Studies, monitoring, laboratory analysis, retirement and final disposal of solid waste in thermoelectric plants (C.T.)

 

In progress

 

 

870,281

 

 

 

-

 

 

 

870,281

 

 

 

-

 

 

 

 

 

870,281

 

Environmental costs in hydroelectric plants

Studies, monitoring, laboratory analysis, retirement and final disposal of solid waste in hydroelectric power plants (C.H.)

 

In progress

 

 

251,277

 

 

 

-

 

 

 

251,277

 

 

 

-

 

 

 

 

 

251,277

 

Ralco Hydroelectric Plant

Reforestation according to the agreement with the Catholic University and Electrification of housing in Ayin Maipu.

 

In progress

 

 

5,075,137

 

 

 

5,075,137

 

 

 

-

 

 

 

-

 

 

 

 

 

5,075,137

 

Tal Tal Thermal Plant

Dejection Nox TalTal: Engineering Civil Works and permits

 

In progress

 

 

1,290,133

 

 

 

1,290,133

 

 

 

-

 

 

 

-

 

 

 

 

 

1,290,133

 

El Toro Hydroelectric Plant

Withdrawal Domestic and Industrial Waste

 

In progress

 

 

-

 

 

 

-

 

 

 

-

 

 

 

-

 

 

 

 

 

-

 

 

 

Total

 

 

18,709,151

 

 

 

10,939,921

 

 

 

7,769,230

 

 

 

2,068,381

 

 

 

 

 

20,777,533

 

 

 

 

 

 

 

 

12-31-2016

 

Company Incurring the Cost

Name

Project

 

Project Status (Finished, In progress)

 

Total Disbursements

ThCh$

 

 

Amounts Capitalized

ThCh$

 

 

Expenses

 

ThCh$

 

 

Disbursement amount in the future

ThCh$

 

 

Estimated future disbursement date

ThCh$

 

Total Disbursements

ThCh$

 

Pehuenche

Hydroelectric Central Environmental Expenditures

Studies, monitoring, laboratory analysis, removal and final disposal of solid waste at hydroelectric power stations (HPS).

 

In progress

 

 

6,515

 

 

 

-

 

 

 

6,515

 

 

 

-

 

 

 

 

 

6,515

 

Gas Atacama Chile

 

 

 

Studies, monitoring and disposal of waste

Higenization, waste treatment, pest management and control system.

 

Finished

 

 

78,221

 

 

 

-

 

 

 

78,221

 

 

 

-

 

 

 

 

 

78,221

 

Studies, monitoring and laboratory analysis

Withdrawal and final disposal of solid waste in Thermal Power Plants

 

In progress

 

 

169,743

 

 

 

-

 

 

 

169,743

 

 

 

-

 

 

 

 

 

169,743

 

Plant ZLD (studies)

Plant ZLD (studies)

 

Finished

 

 

13,470

 

 

 

13,470

 

 

 

-

 

 

 

-

 

 

 

 

 

13,470

 

Coal plants

Emission standard (Desox y Denox Tarapacá)

 

In progress

 

 

27,648,451

 

 

 

27,648,451

 

 

 

-

 

 

 

-

 

 

 

 

 

27,648,451

 

Eolica Canela

Environmental expenditures in power plants

Water quality analysis and monitoring and Higenization Canela

 

In progress

 

 

94,770

 

 

 

-

 

 

 

94,770

 

 

 

-

 

 

 

 

 

94,770

 

Enel Generación Chile S.A.

 

 

 

 

Environmental costs in combined cycle plants

The main expenses incurred are: Bocamina U1-2: Operation and maintenance, monitoring stations air quality and meteorology,

Environmental audit monitoring network 1 per year. Annual Validation CEMS, Protocol Service Biomasa Environmental Materials (magazine, books)

Isokinetic Measurements. Jobs SGI (Objetive NC, inspections, audits and fizcalization) ISO 14001, certification OHSAS, Operation and Maintenance Service CEMS.

 

In progress

 

 

567,616

 

 

 

-

 

 

 

567,616

 

 

 

-

 

 

 

 

 

567,616

 

Environmental costs in thermal plants

Studies, monitoring, laboratory analysis, removal and final disposal of solid waste in thermoelectric plants (Thermal Power Plants)

 

In progress

 

 

243,264

 

 

 

-

 

 

 

243,264

 

 

 

-

 

 

 

 

 

243,264

 

Environmental costs in hydroelectric plants

Studies, monitoring, laboratory analysis, removal and final disposal of solid waste in hydroelectric power plants (HPS)

 

In progress

 

 

181,644

 

 

 

-

 

 

 

181,644

 

 

 

-

 

 

 

 

 

181,644

 

Ralco Hydroelectric Plant

Plan Ralco: Reforestation according to the Agreement with the Catholic University and Electrification of housing in Ayin Maipu.

 

In progress

 

 

4,497,330

 

 

 

4,497,330

 

 

 

-

 

 

 

-

 

 

 

 

 

4,497,330

 

Tal Tal Thermal Plant

Dejection Nox TalTal: Engineering Civil Works and permits

It consists of the pruning of branches until reaching the safety conditions to which the foliage must be left with respect to the drivers.

 

In progress

 

 

3,173,813

 

 

 

3,173,813

 

 

 

-

 

 

 

-

 

 

 

 

 

3,173,813

 

Enel Distribución Chile S.A.

 

 

 

 

 

 

 

 

 

 

 

 

 

Vegetation Control In Redesat

 

Finished

 

 

38,475

 

 

 

-

 

 

 

38,475

 

 

 

-

 

 

 

 

 

38,475

 

Management RESPEL

Consider the costs for the removal and treatment of Hazardous Waste (final destination) generated in maintenance activities AT Networks.

 

Finished

 

 

1,955

 

 

 

-

 

 

 

1,955

 

 

 

-

 

 

 

 

 

1,955

 

Management RESSOL

This activity contemplates the clearing and pruning of the MT / BT distribution networks close to the distribution networks.

 

Finished

 

 

761,090

 

 

 

-

 

 

 

761,090

 

 

 

-

 

 

 

 

 

761,090

 

Environmental management in SSEE

The service consists of the weeding and control of weeds in electric power substation enclosures in order to keep the enclosures free of weeds, ensuring a good operation of these facilities.

 

Finished

 

 

50,686

 

 

 

-

 

 

 

50,686

 

 

 

-

 

 

 

 

 

50,686

 

Improvements in the Network M T/BT

Space CAB and Pre-assembled.

 

Finished

 

 

289,710

 

 

 

289,710

 

 

 

-

 

 

 

-

 

 

 

 

 

289,710

 

Environmental permits

Payments will correspond to environmental commitments in the RCA that environmentally authorizes the project: Noise measurements and sectoral permits for the storage of waste

 

Finished

 

 

44,259

 

 

 

44,259

 

 

 

-

 

 

 

 

 

 

 

 

 

44,259

 

 

Project day Potentiation Line 110 kv Los Almendros, El Salto, Tap Los Dominicos section.

 

In progress

 

 

8,856

 

 

 

8,856

 

 

 

-

 

 

 

5,068

 

 

30-06-2017

 

 

13,924

 

 

DGA Studies project "Powering Line 110 kv, Ochagavia-Florida, Section TAP Santa Elena-TAP Macul" and DIA Ochagavia-Florida Section Tap Santa, Tap Macul.

 

Finished

 

 

6,150

 

 

 

6,150

 

 

 

-

 

 

 

-

 

 

 

 

 

6,150

 

Improvements in the Network M T/BT

The service consists in the maintenance of green areas with replacement of species and turf in substation enclosures of Chilectra.

 

Finished

 

 

49,907

 

 

 

 

 

 

 

49,907

 

 

 

 

 

 

 

 

 

49,907

 

Noise Control

This activity contemplates the maintenance of the easement strip of a high voltage line between 34.5 and 500 kv.

 

Finished

 

 

513

 

 

 

-

 

 

 

513

 

 

 

-

 

 

 

 

 

513

 

 

Measurement of noise in Sta Raquel, La Reina, Cisterna and Sta. Maria substations.

 

In progress

 

 

12,920

 

 

 

12,920

 

 

 

-

 

 

 

-

 

 

 

 

 

12,920

 

Environmental Consulting

Environmental Consulting and Calibration of Sonometer.

 

Finished

 

 

1,492

 

 

 

-

 

 

 

1,492

 

 

 

-

 

 

 

 

 

1,492

 

Environmental permits  Lo Espejo- Ochagavia Line

Sectoral Environmental Permit Processing, Lo Espejo-Ochagavia Line, Tap Cisterna section

 

Finished

 

 

989

 

 

 

989

 

 

 

-

 

 

 

-

 

 

 

 

 

989

 

 

 

Total

 

 

37,941,840

 

 

 

35,695,948

 

 

 

2,245,891

 

 

 

5,068

 

 

 

 

 

37,946,908

 


 

 

 

 

 

12-31-2015

 

Company Incurring the Cost

Name

Project

 

Project Status (Finished, In progress)

 

Total Disbursements

ThCh$

 

 

Amounts Capitalized

ThCh$

 

 

Expenses

ThCh$

 

 

Disbursement amount in the future

ThCh$

 

 

Estimated future disbursement date

ThCh$

 

Total Disbursements

ThCh$

 

Pehuenche

Hydroelectric Central Environmental Expenditures

Studies, monitoring, laboratory analysis, removal and final disposal of solid waste at hydroelectric power stations (HPS), thermoelectric power stations and combine cycle power stations.

 

In progress

 

 

16,877

 

 

 

-

 

 

 

16,877

 

 

 

-

 

 

 

 

 

16,877

 

Investments in Central Hydroelectric Plants

Regularization fuel facilities; Regularization water and sewer system; Regularization collection wells; Fabrication and installation cubits acid spill; Normalization fenced site archeology

 

In process

 

 

361,712

 

 

 

361,712

 

 

 

-

 

 

 

-

 

 

 

 

 

361,712

 

Enel Distribución Chile S.A.

 

 

Vegetation Control In Redesat

This activity contemplates the maintenance of the band of easement of high voltage lines between 34,5 y 500kv.

 

Finished

 

 

79,956

 

 

 

-

 

 

 

79,956

 

 

 

982,347

 

 

31/12/2015

 

 

1,062,303

 

Management Respel

Dangerous waste management

 

Finished

 

 

3,377

 

 

 

-

 

 

 

3,377

 

 

 

-

 

 

 

 

 

3,377

 

Environmental management in Ssee

Tree maintenance of SSEE and removal of brush, debris and garbage, outer perimeter.

 

Finished

 

 

112,437

 

 

 

-

 

 

 

112,437

 

 

 

-

 

 

 

 

 

112,437

 

Improvements in the Network M T/Bt

Traditional network replacement by protected, concentric, other

 

Finished

 

 

1,841,766

 

 

 

1,841,766

 

 

 

-

 

 

 

-

 

 

 

 

 

1,841,766

 

Vegetation Control in Networks Mt/Bt

Pruning of trees near the media network and low voltage.

 

Finished

 

 

930,940

 

 

 

-

 

 

 

930,940

 

 

 

-

 

 

 

 

 

930,940

 

Noise Control

Noise measurement and electromagnetic fields in substation, lines and other facilities.

 

Finished

 

 

5,710

 

 

 

-

 

 

 

5,710

 

 

 

223,482

 

 

31/12/2015

 

 

229,192

 

Compañía Electrica Tarapacá S.A.

 

Waste

Studies, monitoring, laboratory analysis and waste disposal retirement

 

Finished

 

 

196,060

 

 

 

-

 

 

 

196,060

 

 

 

-

 

 

 

 

 

196,060

 

Waste treatment

Removal of non-hazardous household and industrial waste

 

Finished

 

 

127,053

 

 

 

-

 

 

 

127,053

 

 

 

-

 

 

 

 

 

127,053

 

Abatement Nox (LNF burners + OFA), desulfurizer and monitoring CEMS emissions

Abatement Nox (LNF burners + OFA), desulfurizer and  monitoring CEMS emissions

 

Finished

 

 

9,624

 

 

 

9,624

 

 

 

-

 

 

 

 

 

 

 

 

 

9,624

 

Afforestation (RCA) Water Eyes

Afforestation (RCA) Water Eyes

 

Finished

 

 

27,032

 

 

 

27,032

 

 

 

-

 

 

 

 

 

 

 

 

 

27,032

 

Eolica Canela

Central Environmental expenses

Water quality analysis and monitoring and Higenization Canela

 

In progress

 

 

11,376

 

 

 

-

 

 

 

11,376

 

 

 

-

 

 

 

 

 

11,376

 

Enel Generación Chile S.A.

 

Central Environmental Costs

Waste treatment, sanitation

 

In progress

 

 

2,455,575

 

 

 

-

 

 

 

2,455,575

 

 

 

-

 

 

 

 

 

2,455,575

 

CT Bocamina

Emissions monitoring, CEMS project, NOX abatement

 

In progress

 

 

1,855

 

 

 

1,855

 

 

 

-

 

 

 

-

 

 

 

 

 

1,855

 

Cems project

Cems C.T. Quintero project, C.T. San Isidro  II project and C.T. Tal Tal project

 

In progress

 

 

61

 

 

 

61

 

 

 

-

 

 

 

-

 

 

 

 

 

61

 

Regularizations C.H.

Regularizations C.H.

 

In progress

 

 

155,485

 

 

 

155,485

 

 

 

-

 

 

 

-

 

 

 

 

 

155,485

 

Regularizations C.H. Ralco

Social Afforestation Program and Restorations Palmucho Chenqueco bypass road; Bridge reconstruction Lonquimay.

 

In progress

 

 

1,051,017

 

 

 

1,051,017

 

 

 

-

 

 

 

-

 

 

 

 

 

1,051,017

 

 

 

Total

 

 

7,387,913

 

 

 

3,448,552

 

 

 

3,939,361

 

 

 

1,205,829

 

 

 

 

 

8,593,742