XML 335 R87.htm IDEA: XBRL DOCUMENT v3.25.1
Environment (Tables)
12 Months Ended
Dec. 31, 2024
ENVIRONMENT  
Summary of Environmental Expenses

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

12-31-2024

​

​

​

​

​

​

​

12-31-2023

Disbursing Company

​

Project Name

​

Environmental Description

​

Project status [Completed, in progress]

​

Disbursement amount

​

Capitalized amount

​

Expense amount

​

Future disbursement amount

​

Estimated date of future disbursement

​

Total disbursements

​

Amount of prior period disbursement

Pehuenche S.A.

​

​

​

Waste Management

​

In progress

​

42,693

​

—

​

42,693

​

—

​

—

​

42,693

​

68,947

​

​

Pehuenche power plant

​

Environmental Sanitation

​

In progress

​

6,652

​

—

​

6,652

​

—

​

—

​

6,652

​

1,707

​

​

​

​

Environmental materials

​

In progress

​

5,690

​

—

​

5,690

​

—

​

—

​

5,690

​

18,170

Enel Distribución Chile S.A.

​

Vegetation control in MT/BT

​

Pruning of trees near the media network and low voltage.

​

In progress

​

3,550,212

​

—

​

3,550,212

​

8,622,291

​

12/31/2025

​

12,172,503

​

1,532,887

​

​

SEF STANDARDIZATION PROJECT (CAPEX)

​

Underground Networks Interaction Project between Enel and Metrogas

​

In progress

​

612,337

​

—

​

612,337

​

—

​

—

​

612,337

​

639,601

​

​

Improvements environmental impact

​

Urban tree planting project (2T)

​

In progress

​

—

​

—

​

—

​

10,000,000

​

12/31/2025

​

10,000,000

​

—

​

​

​

​

Waste recovery initiative (4T)

​

In progress

​

—

​

—

​

—

​

2,000,000

​

12/31/2025

​

2,000,000

​

—

​

​

​

​

Asbestos Storage Project (2T)

​

In progress

​

—

​

—

​

—

​

7,000,000

​

12/31/2025

​

7,000,000

​

—

​

​

​

​

MA Space in the CEO  (2T)

​

In progress

​

—

​

—

​

—

​

12,000,000

​

12/31/2025

​

12,000,000

​

—

Enel Generación Chile S.A.

​

Environmental expenses, and certifications, Coal Power Plants (CP)

​

The main expenses incurred are: Investments, improvements and work performed  to obtain certificates in Diesel tanks,. Operation and maintenance, monitoring air quality and meteorological stations, Environmental audit monitoring network once a year, Annual CEMS Validation, Biomass Protocol Service, Environmental Materials (magazine, books), Isokinetic Measurements, SGI Works (NC objective, inspections, audits and supervision) ISO 14001, OHSAS certification, CEMS operation and maintenance service.

​

In progress

​

9,564,824

​

7,168,324

​

2,396,500

​

1,487,715

​

—

​

11,052,539

​

1,798,851

​

​

Environmental expenses, adaptations and certifications, Thermal Power Plants (TP)

​

Studies, monitoring, laboratory analysis, removal and final disposal of solid waste in thermoelectric plants (TP)

​

In progress

​

1,521,191

​

424,705

​

1,096,486

​

894,654

​

—

​

2,415,845

​

1,790,310

​

​

Environmental expenses, Hydroelectric Power Plants (HP)

​

Studies, monitoring, laboratory analysis, removal and final disposal of solid waste in hydroelectric plants (HP)

​

In progress

​

378,046

​

—

​

378,046

​

—

​

—

​

378,046

​

502,557

Enel Green Power Chile S.A.

​

Waste management

​

Contracts for the removal of hazardous and non-hazardous waste

​

In progress

​

436,358

​

—

​

436,358

​

—

​

—

​

436,358

​

91,480

​

​

Environmental sanitation

​

Contracts for vector control, deratization, disinfection

​

In progress

​

49,880

​

—

​

49,880

​

—

​

—

​

49,880

​

22,180

​

​

Campaigns and Studies

​

Contracts for Environmental Monitoring ( Flora and Fauna- Archeology, others)

​

In progress

​

595,261

​

—

​

595,261

​

—

​

—

​

595,261

​

—

​

​

Environmental materials

​

Buy environmental materials (containers, spill kit, others)

​

In progress

​

38,663

​

—

​

38,663

​

—

​

—

​

38,663

​

19,073

​

​

Outsourced services

​

Other services (contracts with third parties)

​

In progress

​

32,667

​

—

​

32,667

​

—

​

—

​

32,667

​

83,111

​

​

Household waste removal

​

Household / domestic waste removal contract (payment of municipal retreat)

​

In progress

​

22,132

​

—

​

22,132

​

—

​

—

​

22,132

​

6,177

​

​

Environmental Travel

​

Tickets - accommodation and travel allowance for site visits to facilities

​

In progress

​

124,926

​

—

​

124,926

​

—

​

—

​

124,926

​

—

​

​

Legal requirements contract

​

Environmental and sectorial permit management contract.

​

In progress

​

193,742

​

—

​

193,742

​

—

​

—

​

193,742

​

27,037

​

​

Rent/vehicle expenses

​

Vehicle rental for environmental trips (field visits / Plants)

​

In progress

​

8,526

​

—

​

8,526

​

—

​

—

​

8,526

​

41,615

​

​

Bird collision monitoring contract

​

Bird Collision Monitoring Contract

​

In progress

​

10,760

​

—

​

10,760

​

—

​

—

​

10,760

​

388,175

Geotérmica del Norte S.A.

​

Waste management

​

Contracts for removal of hazardous and non-hazardous waste

​

In progress

​

63,192

​

—

​

63,192

​

—

​

—

​

63,192

​

13,607

​

​

Environmental sanitation

​

Contracts for vector control, deratization, disinfection.

​

In progress

​

4,380

​

—

​

4,380

​

—

​

—

​

4,380

​

8,630

​

​

Campaigns and Studies

​

Contracts for Environmental Monitoring (Birds Collision - Flora and Fauna - Archeology, others)

​

In progress

​

366,260

​

—

​

366,260

​

—

​

—

​

366,260

​

275,403

​

​

Permitting framework agreement

​

Management contract for environmental and sectoral permits

​

In progress

​

18,821

​

—

​

18,821

​

—

​

—

​

18,821

​

30,286

Parque Eólico Talinay Oriente S.A.

​

Environmental sanitation

​

Contracts for vector control, deratization, disinfection.

​

In progress

​

11,763

​

—

​

11,763

​

—

​

—

​

11,763

​

1,251

​

​

Campaigns and Studies

​

Contracts for Environmental Monitoring (Birds Collision - Flora and Fauna - Archeology, others)

​

In progress

​

30,882

​

—

​

30,882

​

—

​

—

​

30,882

​

5,559

​

​

Environmental materials

​

Buy environmental materials (containers, spill kit, others)

​

In progress

​

27,118

​

—

​

27,118

​

—

​

—

​

27,118

​

614

​

​

Household waste removal

​

Household / domestic waste removal contract (payment of municipal retreat)

​

In progress

​

19,664

​

—

​

19,664

​

—

​

—

​

19,664

​

—

​

​

​

​

Household / domestic waste removal contract

​

In progress

​

21,942

​

—

​

21,942

​

—

​

—

​

21,942

​

11,713

​

​

​

​

Total

​

​

​

17,758,581

​

7,593,029

​

10,165,552

​

42,004,660

​

​

​

59,763,241

​

7,378,941

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

12-31-2023

Disbursing Company

​

Project Name

​

Environmental Description

​

Project status [Completed, in progress]

​

Disbursement amount

​

Capitalized amount

​

Expense amount

​

Future disbursement amount

​

Estimated date of future disbursement

​

Total disbursements

Pehuenche S.A.

​

Pehuenche power plant

​

Waste Management

​

In progress

​

34,473

​

—

​

34,473

​

34,473

​

12-31-2024

​

68,946

​

​

​

​

Environmental Sanitation

​

In progress

​

854

​

—

​

854

​

854

​

12/31/2024

​

1,708

​

​

​

​

Materials Environment

​

In progress

​

9,085

​

—

​

9,085

​

9,085

​

12/31/2024

​

18,170

Enel Distribución Chile S.A.

​

Vegetation control in MT/BT

​

Pruning of trees near the media network and low voltage.

​

In progress

​

1,532,887

​

—

​

1,532,887

​

—

​

—

​

1,532,887

​

​

Improvements in the MT network

​

Replacement underground transformers by Technical Standard (PCB)

​

Completed

​

230,606

​

230,606

​

—

​

—

​

—

​

230,606

​

​

SEF STANDARDIZATION PROJECT (CAPEX)

​

Underground Networks Interaction Project between Enel and Metrogas

​

In progress

​

639,601

​

639,601

​

—

​

—

​

—

​

639,601

Enel Generación Chile S.A.

​

Environmental expenses, and certifications, Coal Power Plants (CP)

​

The main expenses incurred are: Investments, improvements and work performed  to obtain certificates in Diesel tanks,. Operation and maintenance, monitoring air quality and meteorological stations, Environmental audit monitoring network once a year, Annual CEMS Validation, Biomass Protocol Service, Environmental Materials (magazine, books), Isokinetic Measurements, SGI Works (NC objective, inspections, audits and supervision) ISO 14001, OHSAS certification, CEMS operation and maintenance service.

​

In progress

​

587,545

​

105,196

​

482,349

​

1,211,306

​

12/31/2024

​

1,798,851

​

​

Environmental expenses, adaptations and certifications, Thermal Power Plants (TP)

​

Studies, monitoring, laboratory analysis, removal and final disposal of solid waste in thermoelectric plants (TP)

​

In progress

​

1,174,689

​

436,295

​

738,394

​

615,621

​

12/31/2024

​

1,790,310

​

​

Environmental expenses, Hydroelectric Power Plants (HP)

​

Studies, monitoring, laboratory analysis, removal and final disposal of solid waste in hydroelectric plants (HP)

​

In progress

​

143,262

​

—

​

143,262

​

359,295

​

12/31/2024

​

502,557

Enel Green Power Chile S.A.

​

Waste management

​

Contracts for the removal of hazardous and non-hazardous waste

​

In progress

​

91,480

​

—

​

91,480

​

—

​

—

​

91,480

​

​

Environmental sanitation

​

Contracts for vector control, deratization, disinfection.

​

In progress

​

22,180

​

—

​

22,180

​

—

​

—

​

22,180

​

​

Water analysis

​

Monitoring and analysis of drinking water and sewage

​

In progress

​

58,235

​

—

​

58,235

​

—

​

—

​

58,235

​

​

Environmental materials

​

Buy environmental materials (containers, spill kit, others)

​

In progress

​

19,073

​

—

​

19,073

​

—

​

—

​

19,073

​

​

Sewage treatment plant

​

Contract for removal and cleaning of pits and sewage

​

In progress

​

22,707

​

—

​

22,707

​

—

​

—

​

22,707

​

​

Outsourced services

​

Other services (contracts with third parties)

​

In progress

​

83,111

​

—

​

83,111

​

—

​

—

​

83,111

​

​

Permitting framework agreement

​

Management contract for environmental and sectoral permits

​

In progress

​

108,170

​

—

​

108,170

​

—

​

—

​

108,170

​

​

Domestic waste removal

​

Household / domestic waste removal contract (payment of municipal retreat)

​

In progress

​

6,177

​

—

​

6,177

​

—

​

—

​

6,177

​

​

Legal requirement contract

​

Environmental and sectorial permit management contract.

​

In progress

​

27,037

​

—

​

27,037

​

—

​

—

​

27,037

​

​

Rent/vehicle expenses

​

Vehicle rental for environmental trips (field visits / Plants)

​

In progress

​

41,615

​

—

​

41,615

​

—

​

—

​

41,615

​

​

Bird collision monitoring contract

​

Bird collision monitoring contract

​

In progress

​

388,175

​

—

​

388,175

​

—

​

—

​

388,175

​

​

Wildlife monitoring

​

Contracts for Environmental Monitoring (Wildlife)

​

In progress

​

100,470

​

—

​

100,470

​

—

​

—

​

100,470

​

​

Archaeological monitoring

​

Monitoring of archaeological sites

​

In progress

​

36,972

​

—

​

36,972

​

—

​

—

​

36,972

​

​

Noise monitoring

​

Noise monitoring

​

In progress

​

30,545

​

—

​

30,545

​

—

​

—

​

30,545

Geotérmica del Norte S.A.

​

Waste management

​

Contracts for removal of hazardous and non-hazardous waste

​

In progress

​

13,607

​

—

​

13,607

​

—

​

—

​

13,607

​

​

Environmental sanitation

​

Contracts for vector control, deratization, disinfection.

​

In progress

​

8,630

​

—

​

8,630

​

—

​

—

​

8,630

​

​

Water analysis

​

Monitoring and analysis of potable water and wastewater

​

In progress

​

15,675

​

—

​

15,676

​

—

​

—

​

15,675

​

​

Environmental materials

​

Purchase of environmental materials (containers, anti-leak kits, others)

​

In progress

​

275,403

​

—

​

275,403

​

—

​

—

​

275,403

​

​

Sewage treatment plant

​

Contract for removal and cleaning of pits and sewage

​

In progress

​

613

​

—

​

613

​

—

​

—

​

613

​

​

Permitting framework agreement

​

Management contract for environmental and sectoral permits

​

In progress

​

1,140

​

—

​

1,140

​

—

​

—

​

1,140

​

​

Outsourced services

​

Other services (contracts with third parties)

​

In progress

​

30,286

​

30,286

​

30,286

​

—

​

—

​

30,286

Parque Eólico Talinay Oriente S.A.

​

Water analysis

​

Monitoring and analysis of potable water and wastewater

​

In progress

​

15,903

​

—

​

15,903

​

—

​

—

​

15,903

​

​

Campaigns and studies

​

Contracts for Environmental Monitoring (Birds - Flora and Fauna - Archaeology, etc.)

​

In progress

​

1,251

​

—

​

1,251

​

—

​

—

​

1,251

​

​

Water analysis

​

Monitoring and analysis of potable water and wastewater

​

In progress

​

5,478

​

—

​

5,478

​

—

​

—

​

5,478

​

​

Campaigns and studies

​

Contracts for Environmental Monitoring (Birds - Flora and Fauna - Archaeology, etc.)

​

In progress

​

5,559

​

—

​

5,559

​

—

​

—

​

5,559

​

​

Environmental materials

​

Purchase of environmental materials (containers, anti-leak kits,  others)

​

In progress

​

614

​

—

​

614

​

—

​

—

​

614

​

​

Sewage treatment plant

​

Contract for removal and cleaning of pits and sewage

​

In progress

​

585

​

—

​

585

​

—

​

—

​

585

​

​

Domestic waste removal

​

Household / domestic waste removal contract

​

In progress

​

11,713

​

—

​

11,713

​

—

​

—

​

11,713

​

​

Bird Collision Monitoring Contract

​

Bird Collision Monitoring Contract

​

In progress

​

22,203

​

—

​

22,203

​

—

​

—

​

22,203

​

​

​

​

Total

​

​

​

5,797,609

​

1,441,984

​

4,385,912

​

2,230,634

​

​

​

8,028,243

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

12-31-2022

Disbursing Company

​

Project Name

​

Environmental Description

​

Project status [Completed, in progress]

​

Disbursement amount

​

Capitalized amount

​

Expense amount

​

Future disbursement amount

​

Estimated date of future disbursement

​

Total disbursements

Pehuenche S.A.

​

Pehuenche power plant

​

Waste Management

​

In progress

​

29,164

​

—

​

29,164

​

5,405

​

12-31-2023

​

34,569

​

​

​

​

Environmental Sanitation

​

In progress

​

3,105

​

—

​

3,105

​

19,298

​

12-31-2023

​

22,403

​

​

​

​

Materials Environment

​

In progress

​

25,144

​

—

​

25,144

​

24,720

​

12-31-2023

​

49,864

Enel Distribución Chile S.A.

​

Vegetation Control In At Networks (OPEX)

​

This activity contemplates the maintenance of the band of easement of high voltage lines between 34.5 and 500kv.

​

In progress

​

525,809

​

—

​

525,809

​

—

​

—

​

525,809

​

​

Vegetation control in MT/BT

​

Pruning of trees near the media network and low voltage.

​

In progress

​

2,383,970

​

—

​

2,383,970

​

—

​

—

​

2,383,970

​

​

Improvements in the MT network

​

Replacement underground transformers by Technical Standard (PCB)

​

In progress

​

139,820

​

—

​

139,820

​

—

​

—

​

139,820

​

​

SEF standardization project (CAPEX)

​

Underground Networks Interaction Project between Enel and Metrogas

​

In progress

​

2,932,689

​

—

​

2,932,689

​

—

​

—

​

2,932,689

Enel Generación Chile S.A.

​

Environmental expenses, and certifications, Coal Power Plants (CP)

​

The main expenses incurred are: Investments, improvements and work performed  to obtain certificates in Diesel tanks,. Operation and maintenance, monitoring air quality and meteorological stations, Environmental audit monitoring network once a year, Annual CEMS Validation, Biomass Protocol Service, Environmental Materials (magazine, books), Isokinetic Measurements, SGI Works (NC objective, inspections, audits and supervision) ISO 14001, OHSAS certification, CEMS operation and maintenance service.

​

In progress

​

1,611,874

​

689,327

​

922,547

​

632,635

​

12-31-2023

​

2,244,509

​

​

Environmental expenses, adaptations and certifications, Thermal Power Plants (TP)

​

Studies, monitoring, laboratory analysis, removal and final disposal of solid waste in thermoelectric plants (TP)

​

In progress

​

1,231,175

​

182,861

​

1,048,314

​

2,120,483

​

12-31-2023

​

3,351,658

​

​

Environmental expenses, Hydroelectric Power Plants (HP)

​

Studies, monitoring, laboratory analysis, removal and final disposal of solid waste in hydroelectric plants (HP)

​

In progress

​

426,453

​

—

​

426,453

​

718,751

​

12-31-2023

​

1,145,204

Enel Green Power Chile S.A.

​

Waste management

​

Contracts for the removal of hazardous and non-hazardous waste

​

In progress

​

75,422

​

—

​

75,422

​

193,828

​

12-31-2023

​

269,250

​

​

Environmental sanitation

​

Contracts for vector control, deratization, disinfection

​

In progress

​

22,316

​

—

​

22,316

​

195,796

​

12-31-2023

​

218,112

​

​

Water analysis

​

Monitoring and analysis of drinking water and sewage

​

In progress

​

61,552

​

—

​

61,552

​

91,153

​

12-31-2023

​

152,705

​

​

Rent/vehicle expenses

​

Vehicle rental for environmental trips (field visits / Plants)

​

In progress

​

75,481

​

—

​

75,481

​

114,211

​

12-31-2023

​

189,692

​

​

Campaigns and studies

​

Contracts for Environmental Monitoring (Collision of Birds- Flora and Fauna- Archeology, others)

​

In progress

​

13,234

​

—

​

13,234

​

109,770

​

12-31-2023

​

123,004

​

​

Environmental materials

​

Buy environmental materials (containers, spill kit, others)

​

In progress

​

14,203

​

—

​

14,203

​

46,944

​

12-31-2023

​

61,147

​

​

Sewage treatment plant

​

Contract for removal and cleaning of pits and sewage

​

In progress

​

65,043

​

—

​

65,043

​

110,887

​

12-31-2023

​

175,930

​

​

Outsourced services

​

Other services (contracts with third parties)

​

In progress

​

10,932

​

—

​

10,932

​

227,590

​

12-31-2023

​

238,522

​

​

Permitting framework agreement

​

Management contract for environmental and sectoral permits

​

In progress

​

43,576

​

—

​

43,576

​

181,299

​

12-31-2023

​

224,875

​

​

Domestic waste removal

​

Household / domestic waste removal contract

​

In progress

​

78,617

​

—

​

78,617

​

69,700

​

12-31-2023

​

148,317

​

​

Environment travel

​

Tickets - accommodation and travel allowance for site visits to facilities

​

In progress

​

49,605

​

—

​

49,605

​

99,316

​

12-31-2023

​

148,921

​

​

Legal requirement contract

​

Environmental and sectorial permit management contract.

​

In progress

​

217,870

​

—

​

217,870

​

617,101

​

12-31-2023

​

834,971

​

​

Bird collision monitoring contract

​

Bird Collision Monitoring Contract

​

In progress

​

71,680

​

—

​

71,680

​

63,000

​

12-31-2023

​

134,680

​

​

Waste management

​

Contracts for the removal of hazardous and non-hazardous waste

​

In progress

​

26,667

​

—

​

26,667

​

36,764

​

12-31-2023

​

63,431

​

​

Environmental sanitation

​

Contracts for vector control, deratization, disinfection.

​

In progress

​

2,293

​

—

​

2,293

​

37,750

​

12-31-2023

​

40,043

Geotérmica del Norte S.A.

​

Water analysis

​

Monitoring and analysis of drinking water and sewage

​

In progress

​

5,589

​

—

​

5,589

​

5,378

​

12-31-2023

​

10,967

​

​

Campaigns and studies

​

Contracts for Environmental Monitoring (Collision of Birds- Flora and Fauna- Archeology, others)

​

In progress

​

277,126

​

—

​

277,126

​

406,915

​

12-31-2023

​

684,041

​

​

Environmental materials

​

Buy environmental materials (containers, spill kit, others)

​

In progress

​

4,209

​

—

​

4,209

​

5,227

​

12-31-2023

​

9,436

​

​

Sewage treatment plant

​

Contract for removal and cleaning of pits and sewage

​

In progress

​

—

​

—

​

—

​

3,659

​

12-31-2023

​

3,659

​

​

Permitting framework agreement

​

Management contract for environmental and sectoral permits

​

In progress

​

31,411

​

—

​

31,411

​

—

​

12-31-2023

​

31,411

​

​

Domestic waste removal

​

Household / domestic waste removal contract (payment of municipal retreat)

​

In progress

​

8,150

​

—

​

8,150

​

10,950

​

12-31-2023

​

19,100

​

​

Vegetation control in AT networks

​

This activity contemplates the maintenance of the band of easement of high voltage lines between 34.5 and 500kv.

​

In progress

​

102,015

​

—

​

102,015

​

142,081

​

11-30-2022

​

244,096

​

​

​

​

It consists of cutting branches until reaching the safety conditions that the foliage must be left with respect to the drivers.

​

In progress

​

223,178

​

—

​

223,178

​

—

​

—

​

223,178

Enel Transmisión Chile S.A.

​

Environmental management in SSEE

​

The service consists of the maintenance of green areas with replacement of species and grass in Enel substation enclosures

​

In progress

​

59,999

​

—

​

59,999

​

81,570

​

11-30-2022

​

141,569

​

​

Environmental management

​

Environmental management of reforestation in the Parque Metropolitano.

​

In progress

​

7,715

​

—

​

7,715

​

2,580

​

11-30-2022

​

10,295

​

​

​

​

Nests and Others

​

In progress

​

1,590

​

—

​

1,590

​

6,010

​

11-30-2022

​

7,600

​

​

Silica gel replacement in power transformers

​

Considers the replacement of silica gel (hygroscopic salt) to one (1) power transformer.

​

Completed

​

113

​

—

​

113

​

—

​

—

​

113

Parque Eolico Talinay Oriente S.A.

​

Waste management

​

Contracts for the removal of hazardous and non-hazardous waste

​

In progress

​

6,496

​

—

​

6,496

​

7,841

​

12-31-2023

​

14,337

​

​

Environmental sanitation

​

Contracts for vector control, deratization, disinfection.

​

In progress

​

1,789

​

—

​

1,789

​

15,642

​

12-31-2023

​

17,431

​

​

Water analysis

​

Monitoring and analysis of drinking water and sewage

​

In progress

​

4,916

​

—

​

4,916

​

4,640

​

12-31-2023

​

9,556

​

​

Campaigns and studies

​

Contracts for Environmental Monitoring (Collision of Birds- Flora and Fauna- Archeology, others)

​

In progress

​

39,093

​

—

​

39,093

​

—

​

-

​

39,093

​

​

Environmental materials

​

Buy environmental materials (containers, spill kit, others)

​

In progress

​

1,949

​

—

​

1,949

​

5,227

​

12-31-2023

​

7,176

​

​

Sewage treatment plant

​

Contract for removal and cleaning of pits and sewage

​

In progress

​

—

​

—

​

—

​

1,830

​

12-31-2023

​

1,830

​

​

Permitting framework agreement

​

Management contract for environmental and sectoral permits

​

In progress

​

453

​

—

​

453

​

—

​

—

​

453

​

​

Domestic waste removal

​

Household / domestic waste removal contract

​

In progress

​

8,884

​

—

​

8,884

​

25,027

​

12-31-2023

​

33,911

​

​

Bird collision monitoring contract

​

Bird collision monitoring contract

​

In progress

​

41,476

​

—

​

41,476

​

—

​

—

​

41,476

​

​

​

​

Total

​

​

​

10,963,845

​

872,188

​

10,091,657

​

6,440,978

​

​

​