COMMITMENTS AND CONTINGENCIES
Commitments to Acquire Power Plants
In April 2015, the Company entered into purchase and sale agreements to acquire controlling interests in three operating power plants located in South Africa with an aggregate net capacity of 32.6 MW from BioTherm. The aggregate consideration payable for these three power plants is approximately $75.3 million. See Note 2 - Acquisitions for additional discussion of these commitments.    
Legal Proceedings Initiated Against the Company
Project Litigation
GUVNL Litigation
The Company is subject to litigation with Gujarat Urja Vikas Nigam Limited (“GUVNL”), the offtake counterparty for certain power plants in India, which is seeking a reduction of the tariff set forth in the applicable PPAs. In separate litigation, GUVNL also claims that there has been a violation of the terms of certain PPAs between GUVNL and the applicable project companies on account of a change in stockholders since execution of such PPAs, and as such GUVNL is entitled to terminate such PPAs. The Company successfully defended each case at the first court level and an appeal of each case was dismissed by the appellate level, but GUVNL has appealed to the Supreme Court of India on each matter. The cases are currently pending with the Supreme Court of India. The Company believes that the likelihood of an unfavorable outcome is remote.
Honiton Litigation
The Company was subject to litigation proceedings with Suzlon Energy (Tianjin) Limited (“SETL”) with respect to alleged breaches of a turbine supply contract relating to the Honiton wind power plants in China. The operation and maintenance service contracts claim pending before an arbitral tribunal was resolved on December 3, 2015, pursuant to which the Company was required to pay an award of $0.5 million, which was paid in January 2016. On June 3, 2016, SETL and the Company reached a settlement resolving all remaining disputes relating to the turbine contracts. The terms of this final settlement resulted in SETL assigning all rights as a creditor it held against the Company to Beijing Aliyun Investment and Consulting Co. Ltd. (“Aliyun”). In addition, the Company agreed to pay Aliyun $7.1 million (RMB 47.0 million), of which RMB 45.0 million was paid during the second quarter of 2016, and the remaining RMB 2.0 million is due no later than July 2018, subject to various conditions set forth in the settlement agreement. In accordance with the settlement agreement, SETL withdrew its pending claims against the Company. As of June 30, 2017, a liability was recognized related to the proceedings in the amount of $0.3 million (RMB 2.0 million).
Bankruptcy Court Action
Motion to Stay and Motion to Compel Mediation
On November 2, 2016, the unsecured creditors’ committee in the SunEdison Bankruptcy filed an adversary complaint against the Company and others with the U.S. Bankruptcy Court for the Southern District of New York. The complaint and contemporaneous motion to stay seek to stay pending litigation against current and former directors and officers of SunEdison and the Company, including TerraForm Global, Inc. v. SunEdison, Inc., et al., the Company’s action against SunEdison described below. The unsecured creditors’ committee intended to file a derivative action on behalf of the SunEdison bankruptcy estate against current and former SunEdison officers and directors. It requested the stay in order to preserve the proceeds of SunEdison’s and the Company's directors’ and officers’ liability insurance policies. On November 4, 2016, the unsecured creditors’ committee filed a motion in the SunEdison Bankruptcy case for derivative standing to sue various current and former SunEdison officers and directors. The unsecured creditors’ committee filed an amended adversary complaint on November 9, 2016. As described in a motion to compel mediation filed by SunEdison on November 23, 2016, SunEdison and the unsecured creditors’ committee agreed to hold the motion to stay and any proposed claims by the unsecured creditors’ committee against various current and former SunEdison officers and directors in abeyance pending a global mediation relating to insurance issues. The Company’s objection to the motion to stay and the motion to compel mediation was filed on December 1, 2016. On December 28, 2016, pursuant to a consent order entered by the bankruptcy court, SunEdison, the unsecured creditors’ committee and the Company, among other parties, were directed to participate in the mediation process that is being conducted in connection with the SunEdison Bankruptcy. The mediation commenced on February 10, 2017. On March 27, 2017, SunEdison, the unsecured creditors’ committee and the directors and officers of SunEdison who would be defendants in the estate claims proposed to be brought by the unsecured creditors’ committee reached an agreement in principle to settle those claims in exchange for a payment of $32.0 million from the $150.0 million directors’ and officers’ liability insurance policies shared with the Company, TerraForm Power, Inc. (together with its subsidiaries, "TerraForm Power"), SunEdison and certain of their respective directors and officers covering the period from July 15, 2015 to July 14, 2016. The agreement has been approved by the bankruptcy court overseeing the SunEdison Bankruptcy, but remains subject to the effectiveness of the SunEdison Plan and, as a result, the completion of the Brookfield Transaction (which is a condition to the effectiveness of the SunEdison Plan). On March 31, 2017, the limited stay expired. Given the preliminary nature of the claims, the Company is unable to provide any assurances as to the ultimate outcome of these motions or that an adverse resolution of legal proceedings would not have a material adverse effect on the Company’s consolidated financial position and results of operations.
Avoidance Actions
On November 7, 2016, the unsecured creditors’ committee in the SunEdison Bankruptcy filed a motion with the bankruptcy court seeking standing to assert against the Company, on behalf of SunEdison, avoidance claims arising from intercompany transactions between the Company and SunEdison. The Company’s objection to the standing motion was filed on November 29, 2016. The unsecured creditors’ committee filed a reply and supplemental reply in support of its standing motion on December 5, 2016 and December 21, 2016, respectively. On March 6, 2017, the Company entered into a settlement agreement with SunEdison in connection with the SunEdison Bankruptcy and the Merger Agreement (the “Settlement Agreement”), pursuant to which SunEdison would release any potential avoidance claims it may have against the Company. The Settlement Agreement was approved by the Bankruptcy Court on June 7, 2017; however, its effectiveness is conditional on the completion of the Brookfield Transaction. If the Settlement Agreement becomes effective, the Company expects this standing motion will be withdrawn. If the Settlement Agreement is terminated, the Company expects to vigorously contest this standing motion and, if standing is granted, the underlying avoidance claims. The Company is unable to provide any assurances as to the ultimate outcome of these claims or that an adverse resolution of a legal proceeding, if commenced, would not have a material adverse effect on the Company’s consolidated financial position and results of operations.
Renova Arbitration
On July 14, 2016, Renova Energia, S.A. (“Renova”) filed a request for arbitration against TerraForm Global, Inc., TerraForm Global, LLC, TerraForm Global Brazil Holding B.V. and TERP GLBL Brasil I Participacoes S.A. (collectively, the “TerraForm Global Parties”) in the Center for Arbitration and Mediation of the Chamber of Commerce Brazil-Canada (the “Renova Arbitration”). Renova alleges, among other things, that TerraForm Global, Inc. and certain of its subsidiaries listed above: (i) fraudulently induced Renova to enter into the acquisition agreements related to the Salvador and Bahia wind power plants, the omnibus closing agreement with respect to such acquisitions, and the put/call arrangement entered into between SunEdison and Renova in connection with the Renova Transaction based on misleading and false representations about their and SunEdison’s financial condition and prospects; (ii) aided and abetted SunEdison’s fraud; (iii) negligently misrepresented their and SunEdison’s financial conditions and prospects; (iv) committed related violations of federal and state securities laws; (v) breached express warranties under the applicable acquisition agreements; (vi) wrongfully refused to repurchase from Renova seven million shares of TerraForm Global, Inc. Class A common stock pursuant to Renova’s put exercise notice of March 31, 2016, in breach of the put/call arrangement entered into between SunEdison and Renova in connection with the Renova Transaction; and (vii) unjustly enriched themselves. Renova seeks, among other relief, rescission of the Salvador and Bahia transactions, and/or damages in an amount to be determined in the arbitration of not less than $250 million, representing the drop in value of the 20,327,499 shares of TerraForm Global, Inc. Class A common stock Renova received in the Salvador transaction, from its $15/share IPO price to its trading level of $3.38/share at the time the request for arbitration was filed, as well as other related losses. 
On May 26, 2017, the TerraForm Global Parties entered into a Settlement Agreement and Mutual Release (the “Renova Settlement Agreement”) with Renova. The Renova Settlement Agreement resolves all disputes among the TerraForm Global Parties and Renova that are the subject of the Renova Arbitration.
Pursuant to the Renova Settlement Agreement, the TerraForm Global Parties have agreed to make a one-time settlement payment in the aggregate amount of $15.0 million, in exchange for and contingent on the withdrawal with prejudice of all claims and counterclaims made in the Renova Arbitration and termination of the Renova Arbitration. In addition, 792,495 shares of TerraForm Global, Inc. Class A common stock issued to Renova and currently held in escrow pursuant to the acquisition agreements for the Salvador wind power plant acquired by a subsidiary of the Company will be returned to the Company. None of the parties to the Renova Arbitration has admitted to any wrongdoing or liability with respect to the claims asserted in the Renova Arbitration. Subject to the satisfaction of certain conditions set forth in the Renova Settlement Agreement (including the purchase of Renova’s shares of TerraForm Global, Inc. Class A common stock by an affiliate of Brookfield as described below), the parties have granted each other full releases with respect to any claims arising in connection with the previously completed acquisitions by the Company of the Salvador and Bahia wind power plants from Renova and all related transactions and any other disputes that could arise in the future among the TerraForm Global Parties and Renova concerning or related in any way to such transactions and events, which are the subject of the Renova Arbitration.
Also, concurrently with the execution of the Renova Settlement Agreement, Renova and affiliates of Brookfield entered into a Purchase & Sale Agreement (the “PSA”) with respect to all of the shares of Class A common stock of TerraForm Global, Inc. owned by Renova (excluding the shares to be released from escrow to TerraForm Global, Inc. pursuant to the Renova Settlement Agreement). Pursuant to the terms of the PSA, an affiliate of Brookfield agreed to purchase 19,535,004 shares of Class A common stock of TerraForm Global, Inc. from Renova for a purchase price in cash of $4.75 per share, or $92,791,269 in the aggregate. The consummation of the share purchase contemplated by the PSA is subject to customary conditions to closing and is conditioned upon the satisfaction of certain conditions set forth in the Renova Settlement Agreement described above, including the effectiveness of the mutual releases and release of the shares in escrow.
The conditions to the effectiveness of the full releases in the Renova Settlement Agreement, as well as the conditions to the consummation of the share purchase contemplated by the PSA, were satisfied on June 29, 2017. As a result, on June 29, 2017, the Company made a one-time settlement payment to Renova in the aggregate amount of $15.0 million, 792,495 shares of TerraForm Global, Inc. Class A common stock issued to Renova were returned from escrow to the Company, the TerraForm Global Parties and Renova executed and filed a joint stipulation with the Center for Arbitration and Mediation of the Chamber of Commerce Brazil-Canada withdrawing with prejudice all of the claims and counterclaims made in the Renova Arbitration, the full releases provided for in the Renova Settlement Agreement became effective, and the share purchase contemplated by the PSA was consummated.
The Company recognized $3.8 million of general and administrative expenses as of December 31, 2016 as a result of this settlement.
Securities Litigation
Multidistrict Litigation
On July 27, 2016, lead plaintiff Municipal Employees’ Retirement System of Michigan in the Horowitz et. al v. SunEdison, Inc. et al. action (E.D. Mo.) moved to transfer various actions pending in federal district courts to the U.S. District Court for the Southern District of New York (the "SDNY") for consolidated or coordinated pretrial proceedings before the Multidistrict Litigation Panel. On October 4, 2016, the Multidistrict Litigation Panel issued an order transferring the following cases to the SDNY for consolidated or coordinated pretrial proceedings:
Fraser v. Wuebbels et al.
Iron Workers Mid-South Pension Fund v. TerraForm Global, Inc. et al.
Badri v. TerraForm Global, Inc. et al.
Patel v. TerraForm Global, Inc. et al.
Pyramid Holdings, Inc. v. TerraForm Global, Inc. et al.
Beltran v. TerraForm Global, Inc. et al.
Oklahoma Firefighters Pension & Retirement System v. SunEdison, Inc. et al.
Glenview Capital Partners, L.P. et al. v. SunEdison, Inc. et al.
Omega Capital Investors et al. v. SunEdison, Inc. et al.

Four of these actions, Fraser v. Wuebbels et al., Iron Workers Mid-South Pension Fund v. TerraForm Global, Inc. et al., Badri v. TerraForm Global, Inc. et al., and Patel v. TerraForm Global, Inc. et al., were initially filed in the Superior Court of the State of California for the County of San Mateo on October 23, 2015, December 3, 2015, December 9, 2015 and January 4, 2016, respectively. These four separate purported class actions were filed against the Company, certain of its officers and directors, each of the underwriters of the Company’s IPO, and SunEdison. A separate class action, Agrawal v. TerraForm Global, Inc. et al., was filed in the Superior Court of the State of California for the County of San Mateo on October 30, 2015. This action was voluntarily dismissed without prejudice in February 2016. Additionally, two separate purported class action lawsuits, Beltran v. TerraForm Global, Inc. et al. and Pyramid Holdings, Inc. v. TerraForm Global, Inc. et al., were filed on October 29, 2015 and November 5, 2015, respectively, in the U.S. District Court for the Northern District of California against the same defendants. The class action plaintiffs assert claims under Sections 11, 12(a)(2), and 15 of the Securities Act of 1933, as amended (the “Securities Act”). The class action complaints allege, among other things, that the defendants made false and materially misleading statements and failed to disclose material information in the Company's registration statement for the IPO regarding SunEdison and its recent operating results and business strategy. Among other relief, the class action complaints seek class certification, unspecified compensatory damages, rescission, attorneys’ fees, costs, and such other relief as the Court should deem just and proper. On April 26, 2016, in light of SunEdison’s voluntary petition for bankruptcy on April 21, 2016, the Company and the other defendants removed the remaining state actions to the U.S. District Court for the Northern District of California. On May 27, 2016, the plaintiffs in the cases removed from state court filed motions to remand. On June 1, 2016, the defendants filed motions to transfer the cases to the SDNY, the jurisdiction in which SunEdison’s bankruptcy is pending. The previous briefing schedule has been vacated as a result of the October 4, 2016 transfer order issued by the Multidistrict Litigation Panel. On November 3, 2016, Plaintiff in Patel v. TerraForm Global, Inc. et al. voluntarily dismissed the case. On December 20, 2016, Plaintiff in Beltran v. TerraForm Global, Inc. et al. voluntarily dismissed the case. On December 22, 2016, the Court consolidated Pyramid Holdings, Inc. v. TerraForm Global, Inc. et al., Badri v. TerraForm Global, Inc. et al., Iron Workers Mid-South Pension Fund v. TerraForm Global, Inc. et al., and Fraser v. Wuebbels et al. as In re TerraForm Global, Inc. Securities Litigation and ordered the plaintiffs to file a consolidated complaint. On January 16, 2017, the plaintiffs filed the Consolidated Class Action Complaint. On April 21, 2017, the plaintiffs filed a Consolidated Second Amended Class Action Complaint. The Company is in the preliminary stages of reviewing the allegations made in the remaining complaints and, as a result, is unable to provide any assurances as to the ultimate outcome of these lawsuits or that an adverse resolution of these lawsuits would not have a material adverse effect on the Company’s consolidated financial position and results of operations.
On March 29, 2016, plaintiff filed Oklahoma Firefighters Pension & Retirement System v. SunEdison, Inc. et al., in the Superior Court of the State of California for the County of San Mateo against the Company, SunEdison, certain officers and directors of the Company and SunEdison, and the underwriters of the Company’s IPO. The plaintiff asserts claims under Sections 11, 12(a)(2), and 15 of the Securities Act. The complaint alleges, among other things, that the defendants made false and materially misleading statements and failed to disclose material information in the Company's registration statement for the IPO regarding SunEdison and its recent operating results and business strategy. The complaint seeks compensatory damages, rescission, and such other relief (including equitable or injunctive relief) as the Court may deem just and proper. On April 26, 2016, in light of SunEdison’s voluntary petition for bankruptcy on April 21, 2016, the Company and the other defendants removed the action to the U.S. District Court for the Northern District of California. On May 27, 2016, the plaintiffs moved to remand. On June 1, 2016, the defendants moved to transfer the case to the SDNY, the jurisdiction in which SunEdison’s bankruptcy is pending. The Company is in the preliminary stages of reviewing the allegations made in the complaint and, as a result, is unable to provide any assurances as to the ultimate outcome of this lawsuit or that an adverse resolution of this lawsuit would not have a material adverse effect on the Company’s consolidated financial position and results of operations.
On March 29, 2016, plaintiffs filed Glenview Capital Partners, L.P. et al. v. SunEdison, Inc. et al., in the Superior Court of the State of California for the County of San Mateo against the Company, SunEdison, certain officers and directors of the Company and SunEdison, and the underwriters of the Company’s August 5, 2015 bond offering and SunEdison’s August 18, 2015 preferred stock offering. The plaintiffs assert claims under Sections 11, 12(a)(2), and 15 of the Securities Act, as well as the Maryland Securities Act. The plaintiffs allege, among other things, that they purchased securities pursuant to offering documents that contained untrue statements of material fact and omitted other material facts necessary to make the statements in the offering documents not misleading. The complaint further alleges that these false and misleading statements led to the forced conversion of the plaintiffs’ Class D securities into restricted common stock, that the Company breached the June 9, 2015 Class D Purchase Agreement between the Company and the plaintiffs, and that the defendants made negligent misrepresentations in connection with the Company’s Class D registration statement. The complaint seeks unspecified damages, rescission, and such other relief (including equitable or injunctive relief) as the Court may deem just and proper. On April 26, 2016, in light of SunEdison’s voluntary petition for bankruptcy on April 21, 2016, the Company and the other defendants removed the action to the U.S. District Court for the Northern District of California. On May 26, 2016, the plaintiffs filed a motion to remand. On May 27, 2016, the defendants moved to transfer the case to the SDNY, the jurisdiction in which SunEdison’s bankruptcy is pending. The Court held a hearing on the motion to remand and the motion to transfer on August 18, 2016. On August 26, 2016, the Court issued an order denying the plaintiffs’ motion to remand and granting the defendants’ motion to transfer. The Court also certified a legal issue for interlocutory review, and on September 2, 2016, the plaintiffs filed a petition for permission to appeal with the U.S. Court of Appeals for the Ninth Circuit. On November 17, 2016, the Ninth Circuit issued an order requiring all parties to file statements addressing the effect of the Multidistrict Litigation Panel’s transfer order on the motion for permission to appeal. On December 8, 2016, the parties filed their responses. The Company is in the preliminary stages of reviewing the allegations made in the complaint and, as a result, is unable to provide any assurances as to the ultimate outcome of this lawsuit or that an adverse resolution of this lawsuit would not have a material adverse effect on the Company’s consolidated financial position and results of operations.
On March 30, 2016, plaintiffs filed Omega Capital Investors et al. v. SunEdison, Inc. et al., in the Superior Court of the State of California for the County of San Mateo against the Company, SunEdison, certain officers and directors of the Company and SunEdison, and the underwriters of SunEdison’s preferred stock offering. The plaintiffs assert claims under Sections 11, 12(a)(2), and 15 of the Securities Act, as well as the Maryland Securities Act. The plaintiffs allege, among other things, that the defendants made false and misleading statements in connection with the Company’s IPO, and that these false and misleading statements led to the forced conversion of their Class D securities into restricted common stock. The complaint further alleges that the Company breached the June 9, 2015 Class D Purchase Agreement between the Company and the plaintiffs and made negligent misrepresentations in connection with the Company’s Class D registration statement. The complaint seeks unspecified damages, rescission, and such other relief (including equitable or injunctive relief) as the Court may deem just and proper. On April 26, 2016, in light of SunEdison’s voluntary petition for bankruptcy on April 21, 2016, the Company and the other defendants removed the action to the U.S. District Court for the Northern District of California. On May 26, 2016, the plaintiffs filed a motion to remand. On June 1, 2016, the defendants moved to transfer the case to the SDNY, the jurisdiction in which SunEdison’s bankruptcy is pending. The Court held a hearing on the motion to remand and the motion to transfer on August 18, 2016. On August 26, 2016, the Court issued an order denying the plaintiffs’ motion to remand and granting the defendants’ motion to transfer. The Court also certified a legal issue for interlocutory review, and on September 2, 2016, the plaintiffs filed a petition for permission to appeal with the U.S. Court of Appeals for the Ninth Circuit. On November 17, 2016, the Ninth Circuit issued an order requiring all parties to file statements addressing the effect of the Multidistrict Litigation Panel’s transfer order on the motion for permission to appeal. On December 8, 2016, the parties filed their responses. The Company is in the preliminary stages of reviewing the allegations made in the complaint and, as a result, is unable to provide any assurances as to the ultimate outcome of this lawsuit or that an adverse resolution of this lawsuit would not have a material adverse effect on the Company’s consolidated financial position and results of operations.
Conditional Transfer Cases
On October 5, 2016, the Multidistrict Litigation Panel issued conditional transfer orders in three cases, Kingdon Associates et al. v. TerraForm Global, Inc. et al., VMT II LLC v. TerraForm Global, Inc. et al., and Canyon Capital Advisors LLC et al. v. TerraForm Global, Inc. et al.
On July 14, 2016, plaintiffs filed Kingdon Associates et al. v. TerraForm Global, Inc. et al. in the Superior Court of the State of California for the County of San Mateo against the Company, TerraForm Global, LLC, certain officers and directors of the Company and SunEdison, and the underwriters of the Company’s IPO. The plaintiffs assert claims under Sections 11, 12(a)(2), and 15 of the Securities Act, as well as state law claims for breach of contract, negligent misrepresentation, and violation of Maryland securities laws. The plaintiffs allege, among other things, that the defendants made false and materially misleading statements and failed to disclose material information in the Company's registration statement for the IPO regarding SunEdison and its recent operating results and business strategy and that these false and misleading statements led to the forced conversion of their Class D securities into restricted common stock. The complaint further alleges that the Company breached the June 9, 2015 Class D Purchase Agreement between the Company and the plaintiffs and made negligent misrepresentations in connection with the Company’s Class D registration statement. The complaint seeks compensatory damages, rescission, and such other relief (including equitable or injunctive relief) as the Court may deem just and proper. On September 26, 2016, in light of SunEdison’s voluntary petition for bankruptcy on April 21, 2016, the Company and the other defendants removed the action to the U.S. District Court for the Northern District of California. Plaintiffs did not oppose the Multidistrict Litigation Panel's conditional transfer order, and the matter was transferred to the multidistrict litigation on October 20, 2016. The Company is in the preliminary stages of reviewing the allegations made in the complaint and, as a result, is unable to provide any assurances as to the ultimate outcome of this lawsuit or that an adverse resolution of this lawsuit would not have a material adverse effect on the Company’s consolidated financial position and results of operations.
On August 8, 2016, plaintiffs filed Canyon Capital Advisors LLC et al. v. TerraForm Global, Inc. et al. in the Superior Court of the State of California for the County of San Mateo against the Company, certain officers and directors of the Company and SunEdison, and the underwriters of the Company’s IPO and SunEdison’s August 18, 2015 preferred stock offering. The plaintiffs assert claims under Sections 11, 12(a)(2), and 15 of the Securities Act, as well as the California Corporate Securities Law. The plaintiffs allege, among other things, that they purchased securities pursuant to offering documents that contained untrue statements of material fact and omitted other material facts necessary to make the statements in the offering documents not misleading. The complaint seeks unspecified damages, rescission, and such other relief (including equitable or injunctive relief) as the Court may deem just and proper. On September 8, 2016, in light of SunEdison’s voluntary petition for bankruptcy on April 21, 2016, the Company and the other defendants removed the action to the U.S. District Court for the Northern District of California. On September 26, 2016, plaintiffs filed a motion to remand. On October 6, 2016, plaintiffs filed an amended motion to remand. On October 20, 2016, defendants filed their opposition to that motion, and on November 2, 2016, plaintiffs filed their reply. On October 19, 2016, defendants filed a motion to stay the case until a final transfer determination could be made by the Multidistrict Litigation Panel. On November 2, 2016, plaintiffs filed an opposition to the motion to stay. The Court held a hearing on the motion to remand and the motion to stay on November 10, 2016. On October 26, 2016, plaintiffs filed a motion to vacate the conditional transfer order. On November 16, 2016, defendants filed an opposition to the motion to vacate. On November 17, 2016, the parties filed a stipulation withdrawing the motions to stay and vacate, which the Court entered. On November 22, 2016, the Multidistrict Litigation Panel transferred the case to the SDNY for consolidated or coordinated pretrial proceedings. The Company is in the preliminary stages of reviewing the allegations made in the complaint and, as a result, is unable to provide any assurances as to the ultimate outcome of this lawsuit or that an adverse resolution of this lawsuit would not have a material adverse effect on the Company’s consolidated financial position and results of operations.
On September 16, 2016, plaintiff filed VMT II LLC v. TerraForm Global, Inc. et al. in the Superior Court of the State of California for the County of San Mateo against the Company, certain officers and directors of the Company and SunEdison, and the underwriters of SunEdison’s preferred stock offering. The plaintiff asserts claims under Sections 11, 12(a)(2), and 15 of the Securities Act, as well as the Maryland Securities Act. The plaintiff alleges, among other things, that the defendants made false and misleading statements in connection with the Company’s IPO, and that these false and misleading statements led to the forced conversion of their Class D securities into restricted common stock. The complaint further alleges that the Company breached the June 9, 2015 Class D Purchase Agreement between the Company and the plaintiffs and made negligent misrepresentations in connection with the Company’s Class D registration statement. The complaint seeks unspecified damages, rescission, and such other relief (including equitable or injunctive relief) as the Court may deem just and proper. On September 28, 2016, in light of SunEdison’s voluntary petition for bankruptcy on April 21, 2016, the Company and the other defendants removed the action to the U.S. District Court for the Northern District of California. Plaintiffs did not oppose the Multidistrict Litigation Panel's conditional transfer order, and the matter was transferred to the multidistrict litigation on October 20, 2016. The Company is in the preliminary stages of reviewing the allegations made in the complaint and, as a result, is unable to provide any assurances as to the ultimate outcome of this lawsuit or that an adverse resolution of this lawsuit would not have a material adverse effect on the Company’s consolidated financial position and results of operations.
On December 19, 2016, an initial case management conference was held in the multidistrict litigation proceedings in the SDNY. The Court entered a partial stay of all proceedings through March 31, 2017, and entered an order requiring all parties to the multidistrict litigation, including the parties to the conditional transfer cases, to participate in the mediation process that is being conducted in connection with the SunEdison Bankruptcy, which also includes the derivative claim described below. The mediation commenced on February 10, 2017.
On February 6, 2017, the Company filed pre-motion letters with the Court describing the grounds for anticipated motions to dismiss in the following matters: In re TerraForm Global, Inc. Securities Litigation, Oklahoma Firefighters Pension & Retirement System v. SunEdison, Inc. et al., Glenview Capital Partners, L.P. et al. v. SunEdison, Inc. et al., Omega Capital Investors et al. v. SunEdison, Inc. et al., Kingdon Associates et al. v. TerraForm Global, Inc. et al., Canyon Capital Advisors LLC et al. v. TerraForm Global, Inc. et al., and VMT II LLC v. TerraForm Global, Inc. et al. The plaintiffs in those matters filed responses on February 20, 2017.
On March 31, 2017, the partial stay expired. On April 13, 2017, the Court held a status conference and entered a briefing schedule for the Company’s anticipated motion to dismiss the Consolidated Second Amended Class Action Complaint in In re TerraForm Global, Inc. Securities Litigation. The Company filed its motion to dismiss on June 9, 2017, and Plaintiffs filed their opposition on July 21, 2017. The Company’s reply brief is due on August 18, 2017. Further proceedings in the remaining multidistrict litigation matters described above have been stayed pending resolution of the initial motion to dismiss.
On March 22, 2017, the Multidistrict Litigation Panel issued conditional transfer orders in Domenech v. TerraForm Global, Inc. et al. and Perez v. TerraForm Global, Inc. et al., and these matters were transferred to the multidistrict litigation on April 13, 2017 and May 31, 2017, respectively. These matters are further described below.
Derivative Claim
Aldridge v. Blackmore et al.
On April 12, 2016, a verified stockholder derivative complaint on behalf of the Company was filed against four directors of the Company in the Court of Chancery of the State of Delaware. The lawsuit alleges that the directors breached their fiduciary duties by authorizing the Company’s $231.0 million payment to SunEdison for the 425 MW India Projects. The complaint seeks unspecified compensatory damages and such other relief that the Court may deem just and equitable. The Company filed its answer to the complaint on June 30, 2016. On July 6, 2016, the Company served its responses to the plaintiff’s discovery requests. On December 28, 2016, the parties agreed to stay the litigation and participate in the mediation process that is being conducted in connection with the SunEdison Bankruptcy, which also includes the securities litigation cases pending before the Multidistrict Litigation Panel. The mediation commenced on February 10, 2017. On March 31, 2017, the agreed upon stay expired. On April 17, 2017, the Court entered a scheduling order. On July 21, 2017, the parties executed a Stipulation of Settlement, which, subject to Court approval, will settle the litigation for a total aggregate settlement amount of $20.0 million and will be paid out of proceeds from the Company’s directors’ and officers’ liability insurance policies. On July 25, 2017, the Court authorized distribution of notice of the settlement to current stockholders of the Company and stayed all non-settlement-related proceedings. A final settlement hearing is scheduled to occur on October 10, 2017.
Retaliation Claims
Francisco Perez Gundin Claim
On May 18, 2016, the Company’s former director, Francisco Perez Gundin, filed a complaint against the Company, TerraForm Power, Inc., and certain individuals, with the United States Department of Labor. The complaint alleges that the defendants engaged in a retaliatory termination of Mr. Gundin’s employment after he allegedly voiced concerns to SunEdison’s board of directors about public representations made by SunEdison officers regarding SunEdison’s liquidity position, and after he allegedly voiced his opposition to transactions that he alleges were self-interested and which he alleges SunEdison forced on the Company. He alleges that the Company participated in SunEdison’s retaliatory termination by constructively terminating his position as a member of the board of directors of the Company in connection with SunEdison’s constructive termination of his employment. He seeks lost wages, bonuses, benefits, and other money that he alleges that he would have received if he had not been subjected to the allegedly retaliatory termination.
The matter will now be adjudicated in an administrative proceeding before the Occupational Safety and Health Administration of the United States Department of Labor (“OSHA”). On October 17, 2016, the Company filed its Position Statement, which seeks dismissal of the matter in full, in response to the Complaint. On March 6, 2017, Mr. Gundin filed a response to the Company’s Position Statement and an additional Statement of Facts in support of the claim. The Company has not yet been asked by OSHA to provide a response to Mr. Gundin’s submission.
On February 21, 2017, Mr. Gundin filed a complaint against the Company, TerraForm Power, Inc., and certain individuals, with the United States District Court for the District of Maryland. The complaint asserts claims under Section 922 of the Dodd Frank Act, as well as related common law claims, based on allegations that Mr. Gundin was terminated in retaliation for raising concerns to the SunEdison, Inc. board of directors about conduct that he believed constituted violations of federal securities laws. On March 22, 2017, the Multidistrict Litigation Panel issued a conditional transfer order, which Mr. Gundin did not oppose, and the matter was transferred to the multidistrict litigation on April 13, 2017.
On July 21, 2017, the Court held a scheduling conference and entered an initial scheduling order. The Court ordered the Company to file a pre-motion letter describing the grounds for its anticipated motion to dismiss by August 11, 2017. Plaintiff’s response to the pre-motion letter is due on August 25, 2017. The court scheduled a further scheduling conference for October 6, 2017.
The Company is in the preliminary stages of reviewing the allegations made in the complaint. As a result, the Company is unable to predict with certainty the ultimate resolution of this proceeding.
Carlos Domenech Zornoza Claim
On May 10, 2016, the Company’s former director and Chief Executive Officer, Carlos Domenech Zornoza, filed a complaint against the Company, TerraForm Power, Inc., and certain individuals, with the United States Department of Labor. The complaint alleges that the defendants engaged in a retaliatory termination of Mr. Domenech Zornoza’s employment on November 20, 2015 after he allegedly voiced concerns to SunEdison’s board of directors about public representations made by SunEdison officers regarding SunEdison’s liquidity position, and after he allegedly voiced his opposition to transactions that he alleges were self-interested and which he alleges SunEdison forced on the Company. He alleges that the Company participated in SunEdison’s retaliatory termination by terminating his position as Chief Executive Officer of the Company in connection with SunEdison’s termination of his employment. He seeks lost wages, bonuses, benefits, and other money that he alleges that he would have received if he had not been subjected to the allegedly retaliatory termination.
The matter will now be adjudicated in an administrative proceeding before OSHA. On October 17, 2016, the Company filed its Position Statement, which seeks dismissal of the matter in full, in response to the Complaint. On March 3, 2017, Mr. Domenech Zornoza filed a response to the Company’s Position Statement and an additional Statement of Facts in support of the claim. The Company has not yet been asked by OSHA to provide a response to Mr. Domenech Zornoza’s submission.
On February 21, 2017, Mr. Domenech Zornoza filed a complaint against the Company, TerraForm Power, Inc., and certain individuals, with the United States District Court for the District of Maryland. The complaint asserts claims under Section 922 of the Dodd Frank Act, as well as related common law claims, based on allegations that Mr. Domenech Zornoza was terminated in retaliation for raising concerns to the SunEdison, Inc. board of directors about conduct that he believed constituted violations of federal securities laws. On March 22, 2017, the Multidistrict Litigation Panel issued a conditional transfer order with respect to the complaint. On April 12, 2017, Mr. Domenech Zornoza filed a motion to vacate the Multidistrict Litigation Panel’s conditional transfer order, which the defendants opposed on April 28, 2017. On May 31, 2017, the matter was transferred to the multidistrict litigation.
On July 21, 2017, the Court held a scheduling conference and entered an initial scheduling order. The Court ordered the Company to file a pre-motion letter describing the grounds for its anticipated motion to dismiss by August 11, 2017. Plaintiff’s response to the pre-motion letter is due on August 25, 2017. The court scheduled a further scheduling conference for October 6, 2017.
The Company is in the preliminary stages of reviewing the allegations made in the complaint. As a result, the Company is unable to predict with certainty the ultimate resolution of this proceeding.
United States Securities and Exchange Commission Investigation
On April 21, 2016, the Company received a subpoena for documents and information in connection with an investigation by the Enforcement Division of the staff of the SEC captioned “In the Matter of SunEdison, Inc. (HO-12908).” The Company is cooperating with the investigation, and the outcome or resolution of this matter cannot be predicted at this time.
Legal Proceeding Initiated by the Company
TerraForm Global, Inc. v. SunEdison, Inc., et al.
On April 3, 2016, the Company filed a verified complaint against SunEdison, SunEdison Holdings Corporation (collectively with SunEdison, the “SunEdison Defendants”), Ahmad Chatila, Martin Truong and Brian Wuebbels in the Court of Chancery of the State of Delaware. The complaint asserts claims for breach of fiduciary duty, breach of contract and unjust enrichment relating to the failure by the SunEdison Defendants to transfer the equity interests in the 425 MW India Projects for which the Company paid $231.0 million in the fourth quarter of 2015. The complaint seeks various forms of relief, including a constructive trust upon the equity interests of SunEdison in the 425 MW India Projects, money damages from the defendants, restoration of the $231.0 million to the Company and such other relief as the Court may deem just and proper. The claims against the SunEdison Defendants have been stayed as a result of the SunEdison Bankruptcy. The individual defendants filed an answer to the complaint on June 30, 2016. On July 19, 2017, the Company entered into a settlement agreement with the individual defendants, pursuant to which the parties exchanged mutual releases. The Court entered an order dismissing the individual defendants with prejudice on July 20, 2017.
As previously described, the Third Party Sale Transaction was conducted in connection with SunEdison’s bankruptcy process and included the 425 MW India portfolio. The Company has agreed not to pursue claims against a third party buyer, however the Company has retained all of its claims against SunEdison and its affiliated persons.
On September 25, 2016, the Company filed its initial proof of claim in the SunEdison Bankruptcy case, and filed an amended proof of claim on October 7, 2016. As set forth in the proofs of claim, the Company believes it has unsecured claims against SunEdison that it estimates are in excess of $2.0 billion. These claims include, without limitation, claims for damages relating to breach of SunEdison's obligations under the sponsorship arrangements consisting of the various corporate level agreements put in place at the time of the Company’s IPO (collectively, the “Sponsorship Arrangement”) and other agreements; contribution and indemnification claims arising from litigation; claims relating to SunEdison’s breach of fiduciary, agency and other duties; and claims for interference with and the disruption of the business of the Company and its subsidiaries, including the loss of business opportunities, loss of business records, failure to provide timely audited financials, and the increased cost of financing and commercial arrangements. Many of these claims are contingent, unliquidated and/or disputed by SunEdison and other parties in interest in the SunEdison Bankruptcy case, and the estimated amounts of these claims may change substantially as circumstances develop and damages are determined. In addition, recoveries on unsecured claims in the SunEdison Bankruptcy case are expected to be significantly impaired.
On March 6, 2017, the Company entered into the Settlement Agreement with SunEdison. The Settlement Agreement was approved by the bankruptcy court overseeing the SunEdison Bankruptcy on June 7, 2017; however, its effectiveness is conditional on the completion of the Brookfield Transaction. The Settlement Agreement contains certain terms to resolve the complex legal relationship between the Company and SunEdison, including, among other things, an allocation of the total consideration paid in connection with the Brookfield Transaction and, with certain exceptions, the full mutual release of all claims between SunEdison and its affiliated debtors and non-debtors, on the one hand, and the Company and its subsidiaries, on the other hand. This release includes a release by the Company of its claims against the SunEdison Defendants. If the Settlement Agreement is terminated, the Company expects to continue to pursue its claims against the SunEdison Defendants.
Other Matters
From time to time, the Company is a party to legal proceedings arising in the ordinary course of its business. Although the Company cannot predict with certainty the ultimate resolution of such proceedings or other claims asserted against the Company, except as otherwise described above, the Company does not believe that any other currently pending legal proceeding to which the Company is a party will have a material adverse effect on its business, financial condition or results of operations.