EX-96.1 2 tm231507d1_ex96-1.htm EXHIBIT 96.1

 

 

 

 

 

Arctic Project

 

S-K 1300 Technical Report Summary

 

Ambler Mining District, Alaska

 

Report Date: November 30, 2022

 

Prepared for: Trilogy Metals Inc.

1150 – Granville Street

Vancouver, British COlumbia

Canada V7Y 1G5

 

Prepared by: Ausenco Engineering Canada Inc.

 

1050 W Pender St, Suite 1200
Vancouver, British Columbia
Canada V6E 4T3

 

 

 

 

 

 

 

 

   
   

  

Table of Contents

  

1 Executive Summary 1
  1.1 Introduction 1
  1.2 Property Description 1
    1.2.1 Mineral Tenure, Surface Rights, Water Rights, Royalties and Agreements 1
  1.3 Accessibility, Climate, Local Resources, and Infrastructure 2
  1.4 History 3
  1.5 Geological Setting, Mineralization, and Deposit 3
  1.6 Exploration 4
  1.7 Sample Preparation, Analysis and Security 4
  1.8 Data Verification 4
  1.9 Mineral Processing and Metallurgical Testing 5
  1.10 Mineral Resource Estimates 8
  1.11 Mineral Reserve Estimates 11
  1.12 Mining Methods 14
  1.13 Processing and Recovery Methods 14
  1.14 Infrastructure 15
    1.14.1 Infrastructure Requirements 15
    1.14.2 Access 16
    1.14.3 Power 16
    1.14.4 Accommodation 16
    1.14.5 Waste Rock Facility 16
    1.14.6 Overburden Stockpiles 17
    1.14.7 Tailings Management Facility 17
    1.14.8 Water Management 17
    1.14.9 Water Treatment Plant 17
  1.15 Market Studies 18
  1.16 Environmental Studies, Permitting, and Plans, Negotiations, or Agreements with Local Individuals or Groups 18
    1.16.1 Permitting Considerations 18
    1.16.2 Social and Community 19
    1.16.3 Closure Planning 20
  1.17 Capital and Operating Cost Estimates 20
    1.17.1 Capital Costs 20
    1.17.2 Operating Costs 21
  1.18 Economic Analysis 21

  

  
Arctic ProjectPage i
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

  1.19 Interpretations and Conclusions 22
  1.20 Recommendations 22
    1.20.1 Mining 23
    1.20.2 Geology and Resource Models 23
    1.20.3 Open Pit Geotechnical work 24
    1.20.4 Hydrogeology 24
    1.20.5 Tailings Management Facility 24
    1.20.6 Closure 25
    1.20.7 Water Treatment 25
    1.20.8 Metallurgical testing 25
    1.20.9 Recovery methods 25
    1.20.10 Operational Readiness Plan 25
2 Introduction 27
  2.1 Introduction 27
  2.2 Terms of Reference 27
  2.3 Qualified Persons 27
  2.4 Site Visits 28
  2.5 Currency of Report 28
  2.6 Information Sources and References 28
  2.7 Previous Reports 29
  2.8 Abbreviations and Acronyms 29
3 Property Description and Location 36
  3.1 Introduction 36
  3.2 Property Ownership 37
  3.3 Mineral Tenure 37
  3.4 Royalties, Agreements and Encumbrances 42
    3.4.1 Kennecott Agreements 42
    3.4.2 NANA Agreement 42
  3.5 State Royalty 43
  3.6 Surface Rights 43
  3.7 Environmental Considerations 44
  3.8 Permits 44
  3.9 Social Considerations 44
  3.10 Comment on Property Description and Location 44
4 ACESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE and PHYSIOGRAPHY 45
  4.1 Accessibility 45
    4.1.1 Air 45
    4.1.2 Road 45
    4.1.3 Water 45
  4.2 Climate 45

 

  
Arctic ProjectPage ii
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

  4.3 Local Resources and Infrastructure 46
  4.4 Physiography 46
  4.5 Comments on Accessibility, Climate, Local Resources, Infrastructure and Physiography 47
5 HISTORY 48
  5.1 Regional History 48
  5.2 Prior Ownership and Ownership Changes – Arctic Deposit and the Ambler Lands 49
  5.3 Previous Exploration and Development Results – Arctic Deposit 49
    5.3.1 Introduction 49
    5.3.2 Geochemistry 56
    5.3.3 Geophysics 56
    5.3.4 Drilling 56
    5.3.5 Specific Gravity 57
    5.3.6 Petrology, Mineralogy, and Research Studies 57
    5.3.7 Geotechnical, Hydrogeological and Acid-Base Accounting Studies 57
      5.3.7.1 Geotechnical and Hydrogeological Studies 57
      5.3.7.2 Acid-Base Accounting Studies 60
    5.3.8 Metallurgical Studies 60
    5.3.9 Historical Mineral Resource and Mineral Reserve Estimates 60
    5.3.10 Development Studies 60
6 Geological Setting, Mineralization, and Deposit 62
  6.1 Deposit Types 62
    6.1.1 Deposit Model 62
  6.2 Regional Geology – Southern Brooks Range 62
    6.2.1 Terrane Descriptions 63
    6.2.2 Regional Tectonic Setting 65
  6.3 Local Geology 65
    6.3.1 General Stratigraphy of the Ambler Sequence 67
    6.3.2 Structural Framework of the Ambler Mining District 69
      6.3.2.1 F1 Deformation 69
      6.3.2.2 F2 Deformation 70
  6.4 Arctic Property Geology 71
    6.4.1 Lithologies and Lithologic Domain Descriptions 72
      6.4.1.1 Greenstone (GNST) 73
      6.4.1.2 Chlorite Schist (ChS) 73
      6.4.1.3 Talc Schist (TS) 73
      6.4.1.4 Black to Grey Schist (GS) 73
      6.4.1.5 Button Schist (MRP) 74
      6.4.1.6 Quartz-Mica-(Feldspar) Schist (QMS/QFMS) 74
      6.4.1.7 Debris Flow (DM) 74
      6.4.1.8 Greywacke (GW) 74
      6.4.1.9 Lithogeochemistry of Immobile Trace Elements 74
      6.4.1.10 Lithologic Domains 75

 

  
Arctic ProjectPage iii
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

    6.4.2 Structure 75
    6.4.3 Arctic Deposit Alteration 75
    6.4.4 Arctic Deposit Mineralization 76
  6.5 Prospects 77
7 EXPLORATION 79
  7.1 Exploration 79
    7.1.1 Grids and Surveys 81
    7.1.2 Geological Mapping 81
    7.1.3 Geochemistry 83
    7.1.4 Geophysics 83
    7.1.5 Petrology, Minerology and Research Studies 86
  7.2 Drilling 87
    7.2.1 Overview 87
    7.2.2 Drill Companies 98
    7.2.3 Drill Core Procedures 100
      7.2.3.1 BCMC/Kennecott 100
      7.2.3.2 NovaGold/Trilogy (formerly, NovaCopper)/Ambler Metals 100
    7.2.4 Geotechnical and Hydrogeological Drilling 101
    7.2.5 Collar Surveys 104
      7.2.5.1 Kennecott 104
      7.2.5.2 NovaGold/Trilogy (formerly, NovaCopper)/Ambler Metals 104
    7.2.6 Downhole Surveys 105
    7.2.7 Recovery 105
      7.2.7.1 Kennecott 105
      7.2.7.2 NovaGold/Trilogy (formerly, NovaCopper)/Ambler Metals 105
    7.2.8 Drill Intercepts 106
8 Sample Preparation, Ananlyses and Security 111
  8.1 Sample Preparation 111
    8.1.1 Core 111
      8.1.1.1 Kennecott and BCMC 111
      8.1.1.2 NovaGold/Trilogy (formerly, NovaCopper) 111
    8.1.2 Acid-Base Accounting Sampling 112
    8.1.3 Density Determinations 113

    8.1.4 Sample Security 114
    8.1.5 Assay Laboratories 114
    8.1.6 Sample Preparation and Analytical Methods 115
  8.2 Quality Assurance/Quality Control 116
    8.2.1 Database Verification 116
    8.2.2 NovaGold QA/QC Review of Historical Analytical Results 116
    8.2.3 NovaGold/Trilogy (2004 to 2019) QA/QC Results Review 120

 

  
Arctic ProjectPage iv
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

      8.2.3.1 2004 121
      8.2.3.2 2005 121
      8.2.3.3 2006 121
      8.2.3.4 2007 121
      8.2.3.5 2008 121
      8.2.3.6 2011 (analysed in 2013) 122
      8.2.3.7 2015 122
      8.2.3.8 2016 122
      8.2.3.9 2017 122
      8.2.3.10 2019 122
    8.2.4 Density Determination QA/QC 123
      8.2.4.1 Laboratory vs. Fields Determinations 123
      8.2.4.2 Stoichiometric Method 124
      8.2.4.3 Multiple Regressions Method 125
      8.2.4.4 Random Forest Machine Learning Method 126
      8.2.4.5 Comments on Density Determinations 127
    8.2.5 Acid-Base Accounting Sampling QA/QC 127
  8.3 Comments on Sample Preparation, Analyses and Security 128
9 Data Verification 129
  9.1 Comments on Data Verification 129
10 Mineral Processing and Metallurgical Testing 130
  10.1 Introduction 130
  10.2 Historical Testwork Review 132
    10.2.1 Metallurgical Testing – Kennecott Research Centre (1968 to 1976) 132
    10.2.2 Metallurgical Testwork – Lakefield (1998 to 1999) 133
  10.3 Mineralogical and Metallurgical Testwork – 2012 to 2019 134
    10.3.1 Introduction 134
    10.3.2 Test Samples 135
    10.3.3 Mineralogical Investigations 139
    10.3.4 Comminution Testwork 140
    10.3.5 Flotation Testwork 142
    10.3.6 Copper/Lead Separation Testwork 145
  10.4 Mineralogical and Metallurgical Testwork – 2021 to 2022 150
    10.4.1 Introduction 150
    10.4.2 Test Samples 151
    10.4.3 Mineralogical Investigations 157
      10.4.3.1 Talc Optimization Samples 157
      10.4.3.2 Flow Sheet Development Samples 158
      10.4.3.3 Variability Samples 160
    10.4.4 Comminution Testwork 162
    10.4.5 Flotation Testwork 164

 

  
Arctic ProjectPage v
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

   

      10.4.5.1 Talc Optimization Testwork 164
      10.4.5.2 Flowsheet Development Testwork 165
      10.4.5.3 Variability Testwork 166
      10.4.5.4 Copper/Lead Separation Testwork 169
  10.5 Comment on Mineral Processing and Metallurgical Testwork 172
11 Mineral Resource Estimates 173
  11.1 Introduction 173
  11.2 Drill Hole Database 174
  11.3 Interpretations and Geological Modelling Procedures 177
    11.3.1 Lithology Modelling 177
    11.3.2 Talc Modelling 178
    11.3.3 Mineralization Domains 179
  11.4 Exploratory Data Analysis 180
    11.4.1 Specific Gravity 180
    11.4.2 Compositing 183
    11.4.3 Grade Capping 185
    11.4.4 Spatial Analysis 185
    11.4.5 Block Model Setup 193
  11.5 Mineral Resource Estimation 193
    11.5.1 Validation 197
      11.5.1.1 Visual Inspection 197
      11.5.1.2 Statistical Validation 200
      11.5.1.3 Swath Plots 200
      11.5.1.4 Validation of Block Model with the New Drill Holes 207
    11.5.2 Mineral Resource Classification 208
    11.5.3 Uncertainties Affecting Mineral Resource Confidence Classification 210
    11.5.4 Reasonable Prospects for Economic Extraction 210
      11.5.4.1 Basis of Commodity Prices and Cost Assumptions 210
    11.5.5 Mineral Resource Statement 211
12 Mineral Reserve Estimates 213
  12.1 Introduction 213
  12.2 Basis of Commodity Prices and Cost Assumptions Used in Pit Optimization and Cut-Off Determination 213
  12.3 Pit Optimization 213
  12.4 Dilution and Ore Losses 217
  12.5 Cut-Off Definition 219
  12.6 Mineral Reserves Statement 220
  12.7 Risk Factors that Could Materially Affect the Mineral Reserve Estimates 220
13 Mining Methods 222
  13.1 Overview 222
  13.2 Mine Design 222

  

  
Arctic ProjectPage vi
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

  13.3 Interim Phase Design 227
  13.4 Waste Rock Facilities and Stockpile Designs 229
  13.5 Production Schedule 230
  13.6 Waste Material Handling 233
  13.7 Operating Schedule 233
  13.8 Mining Equipment 234
    13.8.1 Blasting 234
    13.8.2 Drilling 237
    13.8.3 Loading 240
    13.8.4 Hauling 243
    13.8.5 Support 244
    13.8.6 Auxiliary 246
    13.8.7 Labour 247
  13.9 Geotechnical and Hydrogeological Assessments 248
    13.9.1 Data Sources 249
    13.9.2 Geology and Structure 249
    13.9.3 Geotechnical Laboratory Testing 251
    13.9.4 Rock Mass Assessment 254
    13.9.5 Kinematic Stability Assessment 255
    13.9.6 Hydrogeology 255
    13.9.7 Pit Inflow 257
    13.9.8 Pore Pressure 258
    13.9.9 Stability Modelling 260
    13.9.10 Slope Design 261
  13.10 Geotechnical Review of Open Pit Design 263
    13.10.1 Slope Stability Risks 263
  13.11 Geochemistry Assessment 265
    13.11.1 Acid Base Accounting Studies 265
    13.11.2 Geochemical Kinetic Studies 265
      13.11.2.1 Waste Rock Program 265
      13.11.2.2 Tailings Program 266
      13.11.2.3 Ore Program 266
14 Processing and Recovery Methods 267
  14.1 Overview 267
  14.2 Process Flowsheet and Area Plan 267
  14.3 Process Design Criteria 271
  14.4 Plant Description 274
    14.4.1 Crushing Plant 274
    14.4.2 Coarse Ore Storage 274
    14.4.3 Grinding and Classification 274
      14.4.3.1 Primary Grinding and Classification 274

 

  
Arctic ProjectPage vii
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

    14.4.4 Flotation 275
      14.4.4.1 Talc Pre-Flotation 275
      14.4.4.2 Copper – Lead Bulk Flotation and Regrinding 275
      14.4.4.3 Copper and Lead Separation Flotation Circuit 276
      14.4.4.4 Zinc Flotation and Regrind 276
    14.4.5 Product Dewatering 277
      14.4.5.1 Copper Concentrate Dewatering 277
      14.4.5.2 Lead Concentrate Dewatering 278
      14.4.5.3 Zinc Concentrate Dewatering 278
    14.4.6 Tailings Disposal 279
    14.4.7 Reagent Handling and Storage 279
      14.4.7.1 Collectors 279
      14.4.7.2 Frother 280
      14.4.7.3 Lime 280
      14.4.7.4 Flocculant 280
      14.4.7.5 Other Reagents 280
    14.4.8 Power Supply 280
    14.4.9 Water Supply 280
      14.4.9.1 Fresh Water Supply System 281
      14.4.9.2 WRCP Water Supply System 281
      14.4.9.3 Process Water Supply System 281
    14.4.10 Air Supply 281
    14.4.11 Assay/Metallurgical Laboratory and Quality Control 281
  14.5 Personnel 282
15 Infrastructure 283
  15.1 Introduction 283
  15.2 Access Roads 286
    15.2.1 Ambler Mining District Industrial Access Road 286
    15.2.2 Arctic Access Road 288
  15.3 Airstrip 290
  15.4 Camps 290
    15.4.1 Bornite Exploration Camp 290
    15.4.2 Construction Camp 290
    15.4.3 Permanent Accommodations Facility 291
  15.5 Fuel Supply, Storage and Distribution 291
  15.6 Power Generation 291
  15.7 Electrical System 292
  15.8 Surface Water Management 292
    15.8.1 Process Water Supply 295
    15.8.2 Water Management Infrastructure 295
      15.8.2.1 Diversions and Collection Channels 295

 

  
Arctic ProjectPage viii
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

      15.8.2.2 Culverts 296
      15.8.2.3 Collections Ponds 297
    15.8.3 Waste Rock Collection Pond 297
    15.8.4 Process Pond 300
    15.8.5 Groundwater Management System 300
    15.8.6 Site Water and Load Balance 301
  15.9 Water Treatment Plant 301
  15.10 Tailings Management Facility 303
    15.10.1 General Description 303
    15.10.2 Design Criteria 303
    15.10.3 Overburden Geotechnical Investigation 304
    15.10.4 Site Selection 305
    15.10.5 Starter Dam 305
    15.10.6 Dam Raises and Final Dam 308
    15.10.7 TMF Water Pool and Water Return 308
    15.10.8 Tailings Delivery and Return Systems 308
  15.11 Waste Rock Facility and Overburden Stockpiles 308
    15.11.1 Waste Rock Facility 309
    15.11.2 Overburden and Topsoil Stockpiles 309
  15.12 Compressed Air Supply 309
  15.13 Site Communications 310
  15.14 Fire Protection 310
  15.15 Plant Buildings 310
    15.15.1 Truck Shop and Mine Offices 310
    15.15.2 Laboratory 311
    15.15.3 Administration Building 311
    15.15.4 Mill Dry Facility 311
    15.15.5 Plant Workshop and Warehouse 311
    15.15.6 Primary Crushing 311
    15.15.7 Crushed Ore Stockpile 311
    15.15.8 Process Plant 311
    15.15.9 Concentrate Loadout 312
    15.15.10 Reagent Storage and Handling 312
    15.15.11 Water Supply 312
  15.16 Concentrate Transportation 312
16 Market Studies 314
  16.1 Introduction 314
  16.2 Metal Prices 314
  16.3 Markets and Contracts 317
    16.3.1 Chinese Import Restrictions 318
    16.3.2 Copper Concentrate 318

 

  
Arctic ProjectPage ix
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

    16.3.3 Zinc Concentrate 318
    16.3.4 Lead Concentrate 319
  16.4 Smelter Term Assumptions 320
    16.4.1 Copper 321
    16.4.2 Zinc 321
    16.4.3 Lead 321
  16.5 Transportation and Logistics 322
  16.6 Insurance 322
  16.7 Representation and Marketing 322
  16.8 Comments on Market Studies and Contracts 322
17 Environmental Studies, Permitting, and Plans, Negotiations, or Agreements with Local Individuals or Groups 323
  17.1 Environmental Studies 323
    17.1.1 Hydrology 323
      17.1.1.1 Recommendations 325
    17.1.2 Water Management 325
    17.1.3 Wetlands Data 326
    17.1.4 Aquatic Life Data 326
    17.1.5 Hydrogeology Data 328
    17.1.6 Cultural Resources Data 329
    17.1.7 Subsistence Data 330
    17.1.8 Endangered Species, Migratory Birds, and Bald and Golden Eagle protection 331
    17.1.9 Metal Leaching / Acid Base Accounting Data 331
  17.2 Operational Site Monitoring 332
  17.3 Mine Reclamation and Closure 332
    17.3.1 Reclamation and Closure Plan 332
    17.3.2 Closure Objectives and Closure Criteria 333
    17.3.3 Closure Activities 333
      17.3.3.1 Open Pit Workings 336
      17.3.3.2 Waste Rock Facility and Tailings Management Facility 336
      17.3.3.3 Buildings and Equipment 337
      17.3.3.4 Mine Infrastructure 337
      17.3.3.5 Landfill 338
      17.3.3.6 Water Management System 338
    17.3.4 Closure Water Treatment 338
    17.3.5 Post-Closure 339
    17.3.6 Closure Cost Estimate 339
      17.3.6.1 General 339
      17.3.6.2 Closure Water Treatment Costs 341
    17.3.7 Reclamation and Closure Financial Assurance 341
  17.4 Permitting Considerations 342

 

  
Arctic ProjectPage x
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

    17.4.1 Exploration Permits 342
    17.4.2 Major Mine Permits 342
  17.5 Social or Community Considerations 344
  17.6 Comment on Environmental Studies, Permitting, and Plans, Negotiations, or Agreements with Local Individuals or Groups 345
18 Capital and Operating Costs 346
  18.1 Capital Costs 346
    18.1.1 Introduction 346
    18.1.2 Arctic Project Execution 346
    18.1.3 Work Breakdown Structure 347
    18.1.4 Estimate Summary 347
    18.1.5 Definition 349
      18.1.5.1 Definition of Costs 349
      18.1.5.2 General Methodology 349
      18.1.5.3 Basic Information 350
      18.1.5.4 Exchange Rates 350
      18.1.5.5 Market Availability 350
    18.1.6 Mining (WBS 1000) 351
      18.1.6.1 Mining Capital Cost Basis of Estimate 353
      18.1.6.2 Mining Equipment 353
      18.1.6.3 Ancillary Equipment 355
      18.1.6.4 Capital Spares 356
      18.1.6.5 Other Capital Costs 357
    18.1.7 Crushing and Process Plant (WBS 2000 & 3000) 357
    18.1.8 Tailings Management Facility (WBS 4000) 358
    18.1.9 Onsite Infrastructure (WBS 5000) 359
      18.1.9.1 Water Treatment Plant 359
      18.1.9.2 Other Onsite Infrastructure Costs 359
    18.1.10 Offsite Infrastructure (WBS 6000) 360
      18.1.10.1 Main Access Road 360
      18.1.10.2 Other Offsite Infrastructure Costs 360
    18.1.11 Indirects (WBS 7000) 360
    18.1.12 Provisions / Contingency (WBS 8000) 361
    18.1.13 Owner’s Costs (WBS 9000) 362
    18.1.14 Sustaining Capital and Closure Costs 363
  18.2 Operating Cost Estimate 364
    18.2.1 Operating Cost Summary 364
    18.2.2 Mining Operating Cost Estimate 365
      18.2.2.1 Mining Operating Cost Basis of Estimate 369
      18.2.2.2 Personnel Costs 369
      18.2.2.3 Maintenance and Repair Cost 370
      18.2.2.4 Diesel and Fuel Consumption 371

  

  
Arctic ProjectPage xi
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

 

   
   

  

      18.2.2.5 Explosives Cost 372
      18.2.2.6 Tires Cost 373
      18.2.2.7 Other Operating Costs 374
    18.2.3 Processing Operating Cost Estimate 374
      18.2.3.1 Power 375
      18.2.3.2 Consumables 375
      18.2.3.3 Maintenance Consumables 376
      18.2.3.4 Labour 376
    18.2.4 General and Administrative and Surface Services Cost Estimates 376
    18.2.5 Road Toll Cost Estimate 378
    18.2.6 Water Treatment Costs 378
19 Economic Analysis 379
  19.1 Forward-Looking Information Cautionary Statements 379
  19.2 Methodology 380
  19.3 Financial Model Parameters 380
  19.4 Economic Analysis 381
    19.4.1 Pre-Tax Financial Analysis 381
      19.4.1.1 Basis of Pre-Tax Financial Evaluation 381
      19.4.1.2 Pre-Tax Financial Results 382
    19.4.2 Post-Tax Financial Analysis 383
      19.4.2.1 US Federal Tax 383
      19.4.2.2 Alaska State Tax 384
      19.4.2.3 Alaska Mining License Tax 384
      19.4.2.4 Post-Tax Financial Results 384
  19.5 Cash Flow 384
  19.6 Sensitivity Analysis 388
20 Adjacent Properties 393
21 Other Relevant Data and Information 394
  21.1 Project Execution Plan 394
    21.1.1 Constraints and Interfaces 394
    21.1.2 Key Project Milestones 394
    21.1.3 Proven Technology 396
    21.1.4 Engineering, Procurement and Construction Management Approach 396
      21.1.4.1 Early Engineering Only with 2-Stage Procurement 396
      21.1.4.2 Early EPCM Leading to Plant Care and Maintenance 397
22 Interpretations and Conclusions 398
  22.1 Introduction 398
  22.2 Mineral Tenure, Surface Rights, Royalties and Agreements 398
  22.3 Geology and Mineralization 398

 

  
Arctic ProjectPage xii
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

 

   
   

  

  22.4 Exploration, Drilling and Analytical Data Collection in Support of Mineral Resource Estimation 398
  22.5 Metallurgical Testwork 399
  22.6 Mineral Resource Estimates 399
  22.7 Mineral Reserve Estimates 400
  22.8 Mining Recovery 401
  22.9 Recovery Methods 401
  22.10 Infrastructure 401
  22.11 Environmental, Permitting and Social 402
  22.12 Market Studies and Contracts 402
  22.13 Capital Costs 403
  22.14 Operating Costs 403
  22.15 Economic Analysis 404
  22.16 Conclusions 404
  22.17 Risks and Opportunities 404
    22.17.1 Permitting 404
    22.17.2 Mining 404
    22.17.3 Geotechnical 404
    22.17.4 Hydrogeology 405
    22.17.5 Tailings Management, Waste Rock and Water Management Facilities 406
    22.17.6 Hydrology 407
    22.17.7 Water and Load Balance 408
    22.17.8 Metallurgical Testwork 409
23 Recommendations 410
  23.1 Introduction 410
  23.2 Mining 410
  23.3 Geology and Resource Models 411
  23.4 Open Pit Geotechnical work 412
  23.5 Hydrogeology 412
  23.6 Tailings Management Facility 413
  23.7 Closure 413
  23.8 Water Treatment 414
  23.9 Metallurgical testing 414
  23.10 Recovery Methods 414
  23.11 Operational Readiness Plan 414
24 References 416
25 RELIANCE ON INFORMATION PROVIDED BY THE REGISTRANT 424
  25.1 Introduction 424
  25.2 Legal Matters 424
  25.3 Taxation 424
  25.4 Environmental Matters and Community Accommodations 425
  25.5 Marketing Information 425

 

Appendix A – Mineral Claims

 

  
Arctic ProjectPage xiii
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

 

   
   

  

List of Tables

 

Table 1-1: Comparison of Bulk versus Sequential Locked-Cycle Test Results – ALS 2021 7
Table 1-2: Summary of Overall Metal Recovery – Arctic Project 8
Table 1-3: Mineral Resource Summary Table, Inclusive of Mineral Reserves 10
Table 1-4: Mineral Resource Summary Table, Exclusive of Mineral Reserves 10
Table 1-5: Optimization Inputs 11
Table 1-6: Mineral Reserve Statement 13
Table 1-7: LOM Average Recovery and Grade 15
Table 1-8: Capital Cost Summary 20
Table 1-9: Overall Operating Cost Estimate 21
Table 1-10: Summary of Recommended Work Packages 23
Table 2-1: Report Contributors 27
Table 2-2: Unit Abbreviations 29
Table 2-3: Acronyms and Abbreviations 31
Table 5-1: Known Mapping, Geochemical, and Geophysical Programs Targeting VMS Prospects in the Ambler Mining District 51
Table 5-2: Summary of Previous Geotechnical and Hydrogeological Work Completed After 1998 58
Table 5-3: Mining and Technical Services 61
Table 7-1: Summary of NovaGold/Trilogy/Ambler Metals Exploration Activities Targeting VMS-style Mineralization in the Ambler Sequence Stratigraphy and the Arctic Deposit 79
Table 7-2: TDEM Loops and Locations 84
Table 7-3: Companies, Campaigns, Drill Holes and Meters Drilled at the Arctic Deposit 87
Table 7-4: Summary of NovaGold/Trilogy/Ambler Metals Arctic Deposit Drilling 88
Table 7-5: Drill, Meterage and Average Drill Depth for Ambler Sequence VMS Targets 90
Table 7-6: Ambler Metals Exploration Drilling – Ambler Schist Belt 91
Table 7-7: 2019-2021 Regional Prospect Drilling Significant Intercepts 92
Table 7-8: Drill Contractors, Drill Holes, Meterage and Core Sizes by Drill Campaign at the Arctic Deposit 99
Table 7-9: Summary of Geotechnical Drilling 101
Table 7-10: Summary of Geotechnical Drilling by Year and Purposes 102
Table 7-11: Recovery and RQD 2004 to 2008 Arctic Drill Campaigns 106
Table 8-1: Analytical Laboratories used for Acid Base Accounting and Kinetic Studies for the Arctic Project 113

 

  
Arctic ProjectPage xiv
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

  

   
   

 

Table 8-2: Analytical Laboratories Used by Operators of the Arctic Project 115
Table 10-1: Summary of Overall Forecast Metal Recovery – Arctic Deposit 131
Table 10-2: Summary of Testwork Chronology and Reporting 131
Table 10-3: Head Analysis, Lakefield Research 1999 133
Table 10-4: Flotation Test on Ambler Low Talc Composite 134
Table 10-5: SGS Burnaby Head Grades – Composite Samples – 2012 135
Table 10-6: ALS Metallurgy Head Grades – Composite Samples – 2017 136
Table 10-7: Mineral Modal Abundance for Composite Samples – SGS Burnaby 2012 139
Table 10-8: Bond Ball Mill Work Index and Abrasion Index Test Results 140
Table 10-9: Summary of SMC Test Results and Additional BMI Data 141
Table 10-10: Summary of Locked Cycle Recovery Data for Composite Sample Testing 143
Table 10-11: Locked Cycle Metallurgical Test Results – SGS Burnaby 2012 144
Table 10-12: Locked Cycle Metallurgical Test Results – ALS Metallurgy 2017 144
Table 10-13: SGS Burnaby Open Circuit Copper and Lead Separation Test Results 146
Table 10-14: ALS Metallurgy Locked Cycle Testing of Copper-Lead Separation Process 146
Table 10-15: Summary of Lead Concentrate Grades for Various Talc Grades in Feed 147
Table 10-16: Summary of Flotation Reagent and Grind Size Objectives 148
Table 10-17: Summary of Lead Concentrate Quality 148
Table 10-18: Summary of Copper Concentrate Quality 149
Table 10-19: Summary of Zinc Concentrate Quality 149
Table 10-20: ALS Head Grades – Pre-Flotation Samples – 2021 151
Table 10-21: ALS Flowsheet Development Head Composites – 2021 151
Table 10-22: ALS Flowsheet Development Composites Head Assays – 2021 152
Table 10-23: ALS Variability Sample Details – 2022 153
Table 10-24: ALS Variability Samples Head Assays – 2022 154
Table 10-25: Bond Ball Mill Work Index and Abrasion Index Test Results 162
Table 10-26: Summary of SPI Test Results 163

  
Arctic ProjectPage xv
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

  

   
   

 

Table 10-27: Summary of Baseline Pre-Flotation Tests 164
Table 10-28: Comparison of Bulk vs. Sequential Locked-Cycle Test Results – ALS 2021 165
Table 10-29: Summary of Variability Open Circuit Flotation Test Results – ALS 2022 167
Table 10-30: ALS Lead Separation Test Results 171
Table 11-1: List of Drill Holes used in 2022 Ambler Metals Resource Model that were Not Included in the 2020 SRK Model 173
Table 11-2: Summary Statistics of Assay Database, Length Weighted 175
Table 11-3: Arctic Lithological Units 178
Table 11-4: Summary of Mineralized Zone Domains 180
Table 11-5: Summary Statistics for SG by Mineralized Zone 181
Table 11-6: Summary Statistics for SG Measured and SG Predicted 182
Table 11-7: Mean SG Values for Measured and Predicted by Bins 182
Table 11-8: Summary Statistics of the Composite Database 184
Table 11-9: Capping Values 186
Table 11-10: Summary Statistics of Uncapped and Capped Values for Payable Metal 187
Table 11-11: Summary Statistics of Uncapped and Capped Values for Deleterious Elements 188
Table 11-12: Estimation Domains 189
Table 11-13: Variogram Models for the Bottom Group 190
Table 11-14: Variogram Models for the Middle Group 191
Table 11-15: Variogram Models for the Top Group 192
Table 11-16: Variogram Model for Talc 193
Table 11-17: Arctic Block Model Parameters 193
Table 11-18: Search Ellipsoid Parameters Used for Payable Metals (Cu, Zn, Ag, and Au) 194
Table 11-19: Search Ellipsoid Parameters Used for Deleterious Elements 195
Table 11-20: Search Ellipsoid Parameters Used for Talc 195
Table 11-21: Search Ellipsoid Parameters Used for SG 196
Table 11-22: Statistics of OK and NN for Payable Metals for the Main Mineralized Zones 202

 

  
Arctic ProjectPage xvi
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

 

 

   
   

 

Table 11-23: Mineral Resource Classification and Criteria 208
Table 11-24: Parameters Used to Generate a Resource Constraining Pit Shell 210
Table 11-25: Mineral Resource Summary Table, Inclusive of Mineral Reserves 211
Table 11-26: Mineral Resource Summary Table, Exclusive of Mineral Reserves 211
Table 12-1: Optimization Inputs 213
Table 12-2: Variable Process Recoveries Used in the NSR Calculation 219
Table 12-3: Mineral Reserve Statement 220
Table 13-1: Geotechnical Design Parameters 223
Table 13-2: Production Schedule 231
Table 13-3: Gross Operating Hours per Year 233
Table 13-4: Equipment Utilization and Efficiency 234
Table 13-5: Blasting Design Input 235
Table 13-6: Material Blasted Quantities 236
Table 13-7: Explosives Quantities 236
Table 13-8: Rock Type Weight and UCS 238
Table 13-9: Workman, Szumanski (1996,1997) Inputs 238
Table 13-10: Drill Penetration Rates 239
Table 13-11: Drill Requirements and Performance 239
Table 13-12: Loading Requirements and Performance 240
Table 13-13: Hydraulic Shovel Productivity 241
Table 13-14: Front End Loader Productivity 242
Table 13-15: Truck Speed Limits 243
Table 13-16: Truck Speed Limits 243
Table 13-17: Truck Requirements and Performance 244
Table 13-18: Support Equipment 245
Table 13-19: Auxiliary Equipment 246
Table 13-20: Ratio Maintenance Hours to Equipment Operated Hours 248
Table 13-21: Summary of Unconfined Compressive Strength by Lithological Units 252

 

  
Arctic ProjectPage xvii
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

 

   
   

  

Table 13-22: Shear Strength Laboratory Test Results Excluding Talc Samples 253
Table 13-23: Summary of Derived Rock Mass Parameter Values per Rock Mass Domain 255
Table 13-24: Estimate Pit Inflow 258
Table 13-25: Selected Slope Stability Acceptance Criteria 260
Table 14-1: Process Design Criteria – Overview 271
Table 14-2: Comminution Design Criteria 271
Table 14-3: Flotation Plant Design Criteria 272
Table 14-4: Annual Reagent Consumption 279
Table 15-1: Personnel Onsite during Operations 291
Table 15-2: Process Water Supply Summary 295
Table 15-3: TMF Design Parameters and Design Criteria 304
Table 15-4: Mode of Transport and Distances for Concentrate Shipping 313
Table 16-1: Average Metal Prices (Data from S&P Market Intelligence and CIBC, 2022) 314
Table 16-2: Chinese Import Restrictions for Copper, Zinc, and Lead Concentrates 318
Table 16-3: Concentrate Transport Costs 322
Table 17-1: Summary of Closure and Reclamation Costs 340
Table 17-2: Major Mine Permits Required for the Arctic Project 343
Table 18-1: Estimate Summary Level 1 Major Facility 347
Table 18-2: Initial Estimate by Major Discipline 348
Table 18-3: Estimate Exchange Rates 350
Table 18-4: Mining Initial and Sustaining Capital Cost 351
Table 18-5: Sustaining Capital Cost Distribution 352
Table 18-6: 141t Truck Capital Pricing 354
Table 18-7: Mine Equipment Capital Cost Inputs 354
Table 18-8: Ancillary Equipment Capital Cost Inputs 355
Table 18-9: Capital Spares 356
Table 18-10: Other Capital Costs 357
Table 18-11: Crushing and Process Plant Capital Costs 357
Table 18-12: TMF Capital Costs 359
Table 18-13: Onsite Infrastructure Costs 359
Table 18-14: Offsite Infrastructure Costs 360
Table 18-15: Indirect Capital Costs 360
Table 18-16: Estimate Contingency 361
Table 18-17: Owner’s Costs 362
Table 18-18: Sustaining Capital and Closure Costs 363

 

  
Arctic ProjectPage xviii
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

 

   
   

  

Table 18-19: Overall Operating Cost Estimate 365
Table 18-20: Mining Operating Cost Summary by Cost Centre 367
Table 18-21: Operating Cost Summary by Cost Centre 367
Table 18-22: Annual Mine Expenditure 368
Table 18-23: Maintenance and Repair Cost 370
Table 18-24: Equipment Fuel Burn Rates 371
Table 18-25: Annual Diesel Consumption 372
Table 18-26: Blasting Explosives and Accessories Cost and Service Fee 373
Table 18-27: Tire Sizes, Pricing, and Life 373
Table 18-28: Other Operating Costs 374
Table 18-29: Summary of Processing Operating Cost Estimates 375
Table 18-30: G&A Cost Estimates 377
Table 19-1: Mine and Payable Metal Production for the Arctic Mine 380
Table 19-2: Summary of Pre-Tax Financial Results 382
Table 19-3: Summary of Post-Tax Financial Results 384
Table 19-4: Pre and Post-Tax Arctic Project Production and Cashflow Forecast 385
Table 19-5: Pre-Tax Sensitivity Summary 389
Table 19-6: Post-Tax Sensitivity Summary 392
Table 23-1: Summary of Recommended Work Packages 410

  

  
Arctic ProjectPage xix
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

 

   
   

  

  List of Figures  
     
Figure 3-1: Arctic Project Location Map 36
Figure 3-2: Upper Kobuk Mineral Projects Lands 38
Figure 3-3: Arctic Project Mineral Tenure Plan 39
Figure 3-4: Mineral Tenure Layout Plan 40
Figure 3-5: Arctic Deposit Location 41
Figure 6-1: Regional Geologic Terranes of the Southern Brooks Range 64
Figure 6-2: Local Geology of the Ambler Mining District 66
Figure 6-3: Ambler Sequence Stratigraphy in the Arctic Deposit Area 68
Figure 6-4: Generalized Geology of the Central Ambler Mining 69
Figure 6-5: Typical F1 Isoclinal Folds Developed in Calcareous Gnurgle Gneiss 70
Figure 6-6: Generalized Geologic Map of the Arctic Deposit 72
Figure 6-7: Major Prospects of the Ambler Mining District 78
Figure 7-1: Mapping Campaigns in and around the Arctic Deposit 82
Figure 7-2: VTEM Flight Lines Over the Ambler Belt and Cosmos Hill Prospective Areas 85
Figure 7-3: ZTEM Flight Lines Over the Ambler VMS Belt and the Bornite Deposit 86
Figure 7-4: Plan Map of Drill Holes coloured by Year in the Vicinity of the Arctic Deposit. Dark Grey is Limits of 2021 Conceptual Pit 89
Figure 7-5: Collar Locations and Principal Target Areas – Ambler Mining District 90
Figure 7-6: Sunshine Prospect and Drill Hole Locations 93
Figure 7-7: Snow Project and Drill Hole Locations 94
Figure 7-8: Northeast and Southeast Arctic and Drill Hole Locations 95
Figure 7-9: 98-9(NEN) Prospect and Drill Hole Locations 96
Figure 7-10: East Dead Creek Prospect and Drill Hole Locations 97
Figure 7-11: Plan Map of Drill Holes in the Vicinity of the Arctic Deposit 98
Figure 7-12: Locations of Geotechnical Drilling 103
Figure 7-13: Locations of Hydrogeological Drilling 104
Figure 7-14: Drill Plan of Arctic Copper Results 107
Figure 7-15: Cross-Section 1 of Arctic Copper Results Looking South 108
Figure 7-16: Cross-Section 2 of Arctic Copper Results Looking South 108
Figure 7-17: Drill Plan of Arctic Zinc Results 109
Figure 7-18: Cross-Section 1 of Arctic Zinc Results Looking South 110
Figure 7-19: Cross-Section 2 of Arctic Zinc Results Looking South 110
Figure 8-1: Historical Cu Re-Assay RMA Chart 117
Figure 8-2: Historical Pb Re-Assay RMA Chart 118
Figure 8-3: Distribution of Historical Samples with Original Laboratory Results (Original Historic Assay Intervals are Indicated in Magenta, Recent Assays are Indicated in Green) 119
Figure 8-4: Spatial Availability of QA/QC Data 120
     

  
Arctic ProjectPage xx
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

 

   
   

  

Figure 8-5: Graph showing Good Agreement between Wet-Dry Measured Specific Gravity and Pycnometer  Measured Specific Gravity 124
Figure 8-6: Measured vs. Stoichiometric Specific Gravities 125
Figure 8-7: Scatter Plot Showing the Measured Specific Gravity vs. Multiple (Copper, Iron, Zinc, Barium) Regression 126
Figure 8-8: Reduced to Major Axis (RMA) Scatter Plot Showing the Predicted and Measured SG Values 127
Figure 10-1: Cu and Zn Test Sample Grades for ALS Metallurgy/SGS Burnaby Programs 137
Figure 10-2: Cu and Pb Test Sample Grades for ALS Metallurgy/SGS Burnaby Programs 137
Figure 10-3: Distribution of Talc Content within the 2012 and 2017 Test Samples 138
Figure 10-4: Cu and Pb Test Sample Grades for ALS Metallurgy Test Program 156
Figure 10-5: Cu and Zn Test Sample Grades for ALS Metallurgy Test Program 156
Figure 10-6: Talc Optimization Composites Mineral Content 158
Figure 10-7: Parent Composite Mineral Content 159
Figure 10-8: Mineral Modal Abundance for Variability Samples 161
Figure 10-9: Variability Composite Copper Recovery vs. Concentrate Grade 169
Figure 10-10: Variability Composite Lead Recovery vs. Concentrate Grade 170
Figure 11-1: East-West Cross Section for Copper Drill Hole Data, Looking North (Resource pit depicted in red) 176
Figure 11-2: East-West Cross-Section of the Arctic Geological Model, Looking North 177
Figure 11-3: East-West Cross-Section of Talc Model Wireframes, Looking North 178
Figure 11-4: East-West Cross-Section of the Arctic Deposit Showing Mineralized Zones 179
Figure 11-5: Cumulative Probability Plot for SG in the Resource Block Model 183
Figure 11-6: Histogram of Composite Lengths 184
Figure 11-7: Cross-Section of Estimation Domains and Talc 189
Figure 11-8: LVA Search Ellipsoids Used in Minzone 5 (Red, Top Group) for Cu Estimation 197
Figure 11-9: East-West Cross-Section for Cu Block Model and Composite Data, Looking North (Resource pit depicted in red) 198
Figure 11-10: East-West Cross-Section for Zn Block Model and Composite Data, Looking North (Resource pit depicted in red) 198
Figure 11-11: East-West Cross-Section for Pb Block Model and Composite Data, Looking North (Resource pit depicted in red) 199
Figure 11-12: East-West Cross-Section for Ag Block Model and Composite Data, Looking North (Resource pit depicted in red) 199
Figure 11-13: East-West Cross-Section for Au Block Model and Composite Data, Looking North (Resource pit depicted in red) 200
Figure 11-14: Cu Swath Plot, OK (Red), NN (Green) and Composite (Black), North-South Direction 203
Figure 11-15: Pb Swath Plot, OK (Red), NN (Green) and Composite (Black), North-South Direction 204
Figure 11-16: Zn Swath Plot, OK (Red), NN (Green) and Composite (Black), North-South Direction 205
Figure 11-17: Ag Swath Plot, OK (Red), NN (Green) and Composite (Black), North-South Direction 206
Figure 11-18: Au Swath Plot, OK (Red), NN (Green) and Composite (Black), North-South Direction 207
Figure 11-19: Oblique View of Mineral Resource Classification Model 209
Figure 11-20: Cross-Section of Mineral Resource Classification Model, Looking North 209
Figure 11-21: Isometric View of Arctic Mineral Resource 212
Figure 12-1: Pit-by-Pit Analysis 216
Figure 12-2: Selected Pit Shell 217
Figure 12-3: Contact Dilution Concept 218
Figure 12-4: Contact Dilution Estimation Procedure 219
Figure 13-1: Geotechnical Slope Design Domains 223
     

  
Arctic ProjectPage xxi
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Figure 13-2: Ultimate Pit Design 225
Figure 13-3: Section 1 Showing Mine Design and Selected Pit Shells (looking NW) 226
Figure 13-4: Section 2 Showing Mine Design and Selected Pit Shells (looking W) 226
Figure 13-5: Phase 1 Design 227
Figure 13-6: Phase 2 Design 228
Figure 13-7: Phase 3 Design 228
Figure 13-8: Waste Rock Facility 229
Figure 13-9: Ore Stockpile 230
Figure 13-10: Annual Production Schedule 232
Figure 13-11: Total Tonnage Mined, Scheduled by Phase 232
Figure 13-12: Isometric View (looking southeast) of Talc Zone Domain Modelled by SRK (2022) Using Leapfrog on the EoY12 design pit 249
Figure 13-13: SRK Structural Model (SRK, 2019) used in the Slope Stability Analysis on the EoY12 Design Pit 250
Figure 13-14: Location Plan, Structural and Geomechanical Domains 251
Figure 13-15: Talc Geotechnical Laboratory Testing Results 254
Figure 13-16: Summarized Hydrogeological Conceptual Model for Pit Area 257
Figure 13-17: Pore Pressure Management Assumptions for East and Northeast Pit Walls 259
Figure 13-18: Recommended Inter-Ramp Angles by Slope Design Domains Projected on EOY12 Design Pit 262
Figure 13-19: Potential Areas of Slope Instability Risks in the 2022 Open Pit Designs 264
Figure 14-1: Process Plant Flowsheet 268
Figure 14-2: Overall Plant Area Plan 269
Figure 14-3: Process Plant Plan 270
Figure 15-1: Proposed Site Layout 284
Figure 15-2: Proposed Location of the Processing Plant and Other Buildings 285
Figure 15-3: Proposed Route of AAP Road 287
Figure 15-4: Arctic Access Road 289
Figure 15-5: Surface Water Management Plan During Operations (Year 2) 293
Figure 15-6: Surface Water Management Plan at the End of LOM (Year 13) 294
Figure 15-7: WRCP and Process Pond Plan 298
Figure 15-8: WRCP and Process Pond 299
Figure 15-9: WRCP and Process Pond 299
Figure 15-10: Cross Section of the TMF & WRF showing Starter Dam to Elevation 805 m 307
Figure 15-11: Cross Section of the TMF and Raises to Final Design Evaluation 307
Figure 16-1: 5-year Average Daily Closing Price for Copper 315
Figure 16-2: 5-year Average Daily Closing Price for Zinc 315
Figure 16-3: 5-year Average Daily Closing Price for Lead 316
Figure 16-4: 5-year Average Daily Closing Price for Gold 316
Figure 16-5: 5-year Average Daily Closing Price for Silver 317
Figure 17-1: Current Water Quality and Hydrology Stations’ Location Map 324
Figure 17-2: 2021 Aquatics Sampling Sites 327
Figure 17-3: Phase One Closure 334
Figure 17-4: Phase Two Closure 335
Figure 18-1: Initial Mining Capital Cost Distribution by Cost Centre 353
Figure 18-2: Costs by Cost Centre 365
     

  
Arctic ProjectPage xxii
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Figure 18-3: Costs by Cost Item 366
Figure 18-4: Total Material Mined and Mine Operating Cost 368
Figure 19-1: Pre-Tax NPV Sensitivity Analysis 390
Figure 19-2: Pre-Tax IRR Sensitivity Analysis 391
Figure 21-1: Project Execution Schedule 395

 

  
Arctic ProjectPage xxiii
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

 

   
   

 

1EXECUTIVE SUMMARY

 

1.1Introduction

 

Trilogy Metals Inc. (Trilogy or Trilogy Metals) is listed on the Toronto Stock Exchange (TSX) and the New York Stock Exchange (NYSE). As a result, Trilogy is a reporting issuer in Canada and must comply with National Instrument 43-101 Standards of Disclosure for Mineral Projects (NI 43-101) and is a registrant with the United States Securities and Exchange Commission (SEC) and must also comply with subpart 229.1300 – Disclosure by Registrants Engaged in Mining Operations of Regulation S-K (S-K 1300).

 

Trilogy commissioned Ausenco Engineering Canada Inc. (Ausenco) to manage the update of the 2020 Arctic Feasibility Study Technical Report (2020 FS) prepared in accordance with NI 43-101 into a prefeasibility-level study (the Arctic Project) and summarize into a S-K 1300 Technical Report Summary (the Report) on the Arctic deposit in the Ambler Mining District of northwest Alaska.

 

This Report was prepared by Ausenco, Brown & Caldwell (B&C), SRK Consulting (Canada) Inc. (SRK or SRK Canada), and Wood Canada Limited (Wood) for Trilogy to support disclosures in its Annual Report on Form 10-K for the fiscal year ended November 30, 2022.

 

The Report supports Mineral Resources and Mineral Reserves using the standards and definitions in S-K 1300.

 

The Report presents Mineral Resource and Mineral Reserve estimates for the Project, and an economic assessment based on open pit mining operations and a conventional processing circuit that would produce copper, zinc, and lead concentrates.

 

All units of measurement in this Report are metric, unless otherwise stated. Monetary units are in US dollars, unless otherwise stated.

 

1.2Property Description

 

The Arctic property is located in the Ambler mining district (Ambler Mining District) of the southern Brooks Range, in the Northwest Arctic Borough (NWAB) of Alaska. The property is geographically isolated with no current road access or nearby power infrastructure. The property is located 270 km east of the town of Kotzebue, 37 km northeast of the village of Kobuk, and 260 km west of the Dalton Highway, an all-weather state-maintained highway and centred around geographic coordinates N67.17° latitude and W156.39° longitude.

 

1.2.1Mineral Tenure, Surface Rights, Water Rights, Royalties and Agreements

 

NovaGold Resources Inc. (NovaGold) acquired the Arctic Project from Kennecott Exploration Company and Kennecott Arctic Company (collectively, Kennecott) in 2004. In 2011, NovaGold transferred all copper projects to NovaCopper Inc. and spun-out NovaCopper to its then existing shareholders in 2012. NovaCopper Inc. subsequently underwent a name change to Trilogy Metals Inc. in 2016. Under the Kennecott Purchase and Termination Agreement, Kennecott retained a 1% net smelter return (NSR) royalty that has been subsequently sold by Kennecott. The 1% NSR runs with the lands and is purchasable at any time from the royalty holder for a one-time payment of $10 million.

 

The Project is directly held by Ambler Metals LLC (Ambler Metals), in a 50/50 joint venture formed between South32 Limited (South32) and Trilogy Metals in February 2020. Upon the formation of the joint venture, Trilogy Metals contributed all of its Alaskan assets, including the Project and the agreement with NANA (see below), to Ambler Metals in exchange for a 50% membership interest and at the same time, South32 contributed $145 million in cash for a 50% membership interest.

  
Arctic ProjectPage 1
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

The UKMP consists of an approximately 448,217-acre land package containing state, patented and native lands within an area of interest. There are two discrete mineralized belts within the UKMP – the Devonian Ambler Schist Belt and the Devonian Bornite Carbonate Sequence. The Project is located within the Ambler Schist Belt which comprises approximately 231,008 acres (93,446 ha) of State of Alaska mining claims and US Federal patented mining claims in the Kotzebue Recording District. Exclusive of native lands, the UKMP land tenure consists of 2,136 contiguous State claims totalling 230,736 acres (93,336 ha), including 905 40-acre claims, 1,231 160-acre claims, and 18 Federal patented claims comprising 271.9 acres (110 ha) held in the name of Ambler Metals LLC. Surface use of the private land held as Federal patented claims is limited only by reservations in the patents and by generally applicable environmental laws. Surface use of State claims allows the owner of the mining claim to make such use of the surface as is “necessary for prospecting for, extraction of, or basic processing of minerals.”

 

The UKMP also consists of lands owned by NANA Regional Corporation, Inc. (NANA), who controls lands granted under the Alaska Native Claims Settlement Act (ANCSA) to the south of the Project boundary. Ambler Metals and NANA are parties to an agreement dated October 19, 2011 (the NANA Agreement) that consolidates the parties’ land holdings into an approximately 190,929 ha land package and provides a framework for the exploration and development of the area. The NANA Agreement has a term of 20 years, with an option in favour of Ambler Metals to extend the term for an additional 10 years. If, following receipt of a feasibility study and the release for public comment of a related draft environmental impact statement, a decision is made to proceed with construction of a mine on the lands subject to the NANA Agreement, NANA will have 120 days to elect to either (a) exercise a non-transferrable back-in-right to acquire between 16% and 25% (as specified by NANA) of that specific project; or (b) not exercise its back-in-right, and instead receive a net proceeds royalty equal to 15% of the net proceeds realized from such project. In the event that NANA elects to exercise its back-in-right, the parties will, as soon as reasonably practicable, form a joint venture with NANA electing to participate between 16% to 25%, and Ambler Metals owning the balance of the interest in the joint venture. If Ambler Metals decides to proceed with construction of a mine on its own lands subject to the NANA Agreement, NANA will enter into a surface use agreement which will afford Ambler Metals access to the project along routes approved by NANA. In consideration for the grant of such surface use rights, NANA will receive a 1% net smelter royalty on production and provide an annual payment on a per acre basis.

 

1.3Accessibility, Climate, Local Resources, and Infrastructure

 

Primary access to the Project is by air, using both fixed wing aircraft and helicopters.

 

There are four well-maintained, approximately 1,500 m-long gravel airstrips located near the Project, capable of accommodating charter fixed wing aircraft. These airstrips are located 64 km west at Ambler, 46 km southwest at Shungnak, 37 km southwest at Kobuk, and 34 km southwest at Dahl Creek. There is daily commercial air service from Kotzebue to the village of Kobuk, the closest community to the Project. During the summer months, the Dahl Creek Camp airstrip is suitable for larger aircraft, such as a C-130 and DC-6.

 

In addition to the four 1,500 m airstrips, there is a 700 m airstrip located at the Bornite Camp. The airstrip at Bornite is suited to smaller aircraft, which support the Bornite Camp with personnel and supplies. There is also a 450 m airstrip (Arctic airstrip) located at the base of Arctic Ridge that can support smaller aircraft.

 

A winter trail and a one-lane dirt track suitable for high-clearance vehicles or construction equipment links the Arctic Project’s main camp located at Bornite to the Dahl Creek airstrip southwest of the Arctic deposit. An unimproved gravel track connects the Arctic airstrip with the Arctic deposit.

  
Arctic ProjectPage 2
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

The climate in the region is typical of a sub-arctic environment. Weather conditions on the Project can vary significantly from year to year and can change suddenly. During the summer exploration season, average maximum temperatures range from 10 °C to 20 °C, while average lows range from -2°C to 7°C (Western Regional Climate Center: WRCC - Alaska Climate Summaries: Kobuk 1971 to 2000). By early October, unpredictable weather limits safe helicopter travel to the Project. During winter months, the Project can be accessed by snow machine, track vehicle, or fixed wing aircraft. Winter temperatures are routinely below -25°C and can exceed -50°C. Annual precipitation in the region varies with elevation.

 

It is expected that any future mining activity will be conducted on a year-round basis. Exploration activities are generally confined to the period from late May to late September.

 

Kotzebue is a potential source of limited mining-related supplies and labourers, and is the nearest centre serviced by regularly scheduled, large commercial aircraft (via Nome or Anchorage). In addition, there are seven other villages in the region that will be a potential source of some of the workforce for the Project. Fairbanks (population 32,515; 2020 US Census) has a long mining history along with currently operating mines and can provide most mining-related supplies and support that cannot be sourced closer to the Project area.

 

Drilling and mapping programs are seasonal and have been supported out of the Bornite Camp and Dahl Creek Camp. The Bornite Camp facilities are located on Ruby Creek on the northern edge of the Cosmos Hills. The camp provides office space and accommodations for the geologists, drillers, pilots, and support staff. Power is supplied by two diesel generators – one 300 kW and one 225 kW. Water was supplied by the permitted artesian well located 250 m from camp; however, a water well was drilled in camp during the 2017 field season that was permitted by 2019 to provide all potable water for the Bornite Camp.

 

1.4History

 

Prior to Trilogy’s Project interest, work programs were conducted by Bear Creek Mining Company (BCMC), an exploration subsidiary of Kennecott Exploration (Kennecott) and Anaconda. Exploration activities included geological and reconnaissance mapping, geochemical sampling, airborne and ground geophysical surveys, drilling, metallurgical testwork, petrological and mineralogical studies, and resource estimates.

 

Trilogy obtained its project interest from NovaGold in 2011. NovaGold obtained its project interest in 2004, when the Alaska Gold Company, a wholly-owned subsidiary of NovaGold completed an Exploration and Option Agreement with Kennecott to earn an interest in the Ambler land holdings. In 2010, NovaGold acquired a 100% controlling interest by buying out Kennecott’s interest, although Kennecott retained an NSR royalty. Work conducted by NovaGold and Trilogy Metals (formerly, NovaCopper) included geological mapping, soil and silt geochemical sampling, time-domain electromagnetic (TDEM) ground geophysical surveys, airborne DIGHEM geophysical surveys, down-hole geophysics, drilling programs, metallurgical testwork, Mineral Resource and Mineral Reserve estimates, mining studies, and baseline environmental studies.

 

1.5Geological Setting, Mineralization, and Deposit

 

The Arctic deposit is hosted in the Ambler Sequence, in the upper part of the regional Anirak Schist, in the Ambler Mining District on the southern margin of the Brooks Range in Alaska. Ambler Sequence is a group of Middle Devonian to Early Mississippian, metamorphosed, bimodal volcanic rocks with interbedded tuffaceous, graphitic, and calcareous volcaniclastic metasediments. The Arctic deposit has characteristics that are representative of a volcanogenic massive sulphide (VMS) deposit based on its geologic setting, associated host rocks, ore morphology, and ore mineralogy. VMS-style mineralization is found along the entire 110 km strike length of the Ambler Sequence.

  
Arctic ProjectPage 3
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Mineralization occurs as stratiform semi-massive sulphide (SMS) to massive sulphide (MS) beds within primarily graphitic chlorite schists and fine-grained quartz schists. The sulphide beds average 4 m in thickness but vary from less than 1 m up to as much as 18 m in thickness.

 

The bulk of the mineralization occurs within eight modelled SMS and MS zones lying along the upper and lower limbs of the interpreted Arctic isoclinal anticline. All the zones are within an area of roughly 1 km2 with mineralization extending to a depth of approximately 250 m below the surface. Mineralization is predominately coarse-grained sulphides consisting mainly of chalcopyrite, sphalerite, galena, tetrahedrite-tennantite, pyrite, arsenopyrite, and pyrrhotite. Trace amounts of electrum are also present.

 

1.6Exploration

 

Drilling at the Arctic deposit and within the Ambler Mining District has been ongoing since its discovery in 1966. Approximately 67,639 m of drilling was completed within the Ambler Mining District, including 55,038 m of drilling in 285 drill holes at the Arctic deposit or on potential extensions in 32 campaigns spanning 56 years. Drill programs were completed by Kennecott and its subsidiaries, Anaconda, NovaGold, Trilogy and Ambler Metals.

 

Drill collar and downhole survey measurement collected since 2004 have used industry-recognized instrumentation and methods. Many historical collar locations have been resurveyed using these current methods. Between 1998 and 2011, Specific Gravity (SG) measurements were collected from short whole core samples using water displacement or water immersion methods. Since 2011 SG measurements are collected from assay sample intervals of half or whole core using water immersion methods. Core recovery is good.

 

1.7Sample Preparation, Analysis and Security

 

Analytical methods and laboratory accreditations used for historical samples are not known. Samples from the NovaGold/NovaCopper/Trilogy/Ambler Metals programs were submitted to ALS Minerals of Vancouver, British Columbia, Canada for multielement analysis by Inductively Coupled Plasma Mass Spectrometry (ICP MS) following a 4-acid digestion, and for gold analysis of a 30-gram sample by Fire Assay (FA) with an Atomic Absorption (AA) finish. Over limit ICP-MS samples were resubmitted for analysis by ICP-Atomic Emission Spectroscopy (AES) or AA following a 4-acid digestion. Over limit gold results were resubmitted for analysis of a 30-gram sample by FA with a Gravimetric finish.

 

Standard reference materials, blanks, duplicates, and check samples have been regularly submitted for all NovaGold/NovaCopper/Trilogy and Ambler Metals era sampling campaigns. No significant quality control issues are evident in samples analysed since 2004. Samples analyzed since 2004 are in the QP’s opinion appropriate for the mineralization style observed at Arctic and provide adequate confidence in the reported assay values. Historical copper and lead values (pre-2004) that remain in the primary assay database appear to be biased high and low, respectively. The broad spatial distribution of these original historical samples and density of samples with more recent assay values surrounding these samples in the QP’s opinion reduces the risk associated with these observed biases.

 

1.8Data Verification

 

Kennecott entered the historical drill hole information into tables in 1995. In 2006, NovaGold geologists verified the geologic data from the original paper logs against the Kennecott electronic format, and then merged the data into a Microsoft SQL database. In 2013, NovaCopper retained GeoSpark Consulting to complete a 100% verification of the collar survey, downhole survey, and sample interval data. Geospark was also retained to generate QA/QC reports for the NovaGold-era 2004 to 2008 and NovaCopper/Trilogy-era 2011, 2015, 2016, 2017, and 2019 drill campaigns. All data for the Arctic resource area is stored in the GeoSpark Core Database System created and managed by GeoSpark Consulting.

  
Arctic ProjectPage 4
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Between 2004 and 2005 NovaGold completed a resampling program of historic drill holes. As a result, 85 % of the entire assay interval database now has well supported recent assay results. The resampling program included reassay of 289 previously assayed historic sample intervals. Analysis of the paired historic and reassay results indicates there is a 10 % high bias in the legacy Cu values and a 13 % low bias in the legacy Pb values. Legacy sample represent only 15% of the entire assay database and are generally evenly distributed spatially between samples with more recent assay reducing the risk associated with these observed biases.

 

It is the QP’s opinion the drill database and topographic information for the Arctic deposit are reliable and sufficient to support the current estimate of Mineral Resources.

 

1.9Mineral Processing and Metallurgical Testing

 

Since 1970, metallurgical testwork has been conducted to evaluate the ability of the Arctic deposit to produce copper, lead and zinc concentrates. In-general, the samples tested produced similar metallurgical performances and the project has seen the development of a robust metal recovery process to support the current operational plans. Work conducted included mineralogy and flotation testing, locked cycle tests, comminution tests, copper/lead separation testwork, talc optimization testwork, and thickening and filtration testing.

 

Testwork can be broken into four key time periods:

 

1.Historical testwork completed prior to 2012, primarily by Kennecott Research Centre (KRC) in Utah, and Lakefield Research Ltd., Lakefield, Ontario;

 

2.Preliminary Trilogy Metals testwork conducted at SGS Mineral Services, Vancouver (SGS Vancouver), in 2012 to 2015;

 

3.Detailed Trilogy Metals testwork conducted at ALS Metallurgy in Kamloops, BC (ALS Metallurgy) in 2015 to 2019; and

 

4.Ambler Metals testwork conducted at ALS Metallurgy and SGS Mineral Services in 2021 to 2022.

 

In 2012, SGS Vancouver conducted a metallurgical test program to further study metallurgical responses of the samples produced from Zones 1, 2, 3, and 5 of the Arctic deposit. The flotation test procedures used talc pre-flotation, conventional copper-lead bulk flotation and zinc flotation, followed by copper and lead separation. In general, the 2012-2015 test results indicated that the samples responded well to the flowsheet tested. The average results of the locked cycle tests (without copper and lead separation) were as follows:

 

•The copper recoveries to the bulk copper-lead concentrates ranged from 89% to 93% excluding the Zone 1 & 2 composite which produced a copper recovery of approximately 84%; the copper grades of the bulk concentrates were 24% to 28%.

 

•Approximately 92% to 94% of the lead was recovered to the bulk copper–lead concentrates containing 9% to 13% lead.

  
Arctic ProjectPage 5
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

•The zinc recovery was 84.2% from Composite Zone 1 & 2, 93.0% from Composite Zone 3 and 90.5% from Composite Zone 5. On average, the zinc grades of the concentrates produced were higher than 55%, excluding the concentrate generated from Composite Zone 1 & 2, which contained only 44.5% zinc.

 

•Gold and silver were predominantly recovered into the bulk copper–lead concentrates. Gold recoveries to this concentrate ranged from 65% to 80%, and silver recoveries ranged from 80% to 86%.

 

Using an open circuit procedure, the copper and lead separation tests on the bulk copper–lead concentrate produced from the locked cycle tests generated reasonable copper and lead separation. The copper concentrates produced contained approximately 28% to 31% copper, while the grades of the lead concentrates were in the range of 41% to 67% lead. In this testwork program, it appeared that most of the gold reported to the copper concentrate and on average the silver was equally recovered into the copper and lead concentrates. Subsequent testwork to better define the copper and lead separation process was conducted in 2017, including a more detailed evaluation of the precious metal deportment in the copper and lead separation process.

 

Grindability testing was completed during both the SGS Vancouver and ALS Metallurgy testwork programs to support the design and economics of efficient grinding of the Arctic materials. Semi-autogenous grind (SAG) mill test results included a single JKTech drop-weight test and 19 SAG media competency (SMC) tests using variability samples. Test results show the material is amenable to SAG milling and is relatively soft, with a reported breakage (axb) average value of 189.7. Bond ball mill work index (BWi) tests were completed on 44 samples and values ranged from 5.4 to 13.1 kWh/t with an average BWi of 8.82 kWh/t. Abrasion index (Ai) tests were completed on five samples and values fluctuated from 0.017 to 0.072 g for the measured samples. The data indicate that the samples are neither resistant nor abrasive to ball mill grinding. The materials are considered to be soft or very soft in terms of grinding requirements. The grinding testwork was used to support detailed grinding circuit design.

 

In 2017, ALS Metallurgy conducted detailed copper and lead separation flotation testwork using a bulk sample of copper–lead concentrate produced from the operation of a pilot plant. This testwork confirmed high lead recoveries in locked cycle testing of the copper–lead separation process and confirmed precious metal recoveries into the representative copper and lead concentrates. This testwork indicated a clear tendency of the gold values to follow the lead concentrate, giving it a significant gold grade and value. Detailed mineralogical analysis showed that a majority of gold values were occurring as liberated fine-grained gold particles.

 

The conclusions of testwork conducted both in 2012 and 2017 indicate that the Arctic materials are well-suited to the production of high-quality copper and zinc concentrates using flotation techniques which are industry standard. Copper and zinc recovery data were reported in the range of 88% to 92%, which reflected the high-grade nature of the deposit as well as the coarse-grained nature of these minerals. Grade variations within the deposit will be observed as indicated by the grade variations observed in variability samples, however, mill feed variability is expected to be limited and readily manageable with good plant operational practices. Lead concentrates have the potential to be of good quality and can also be impacted by zones of very high talc. Considerable care will be required to ensure maximum talc recovery to remove talc, which has the potential to dilute lead concentrate grades. The lead concentrate is also shown to be rich in precious metals, which has some advantages in terms of marketability of this material.

 

Ancillary testwork was completed by third party consultants on representative concentrate samples, to provide thickening and filtration data for the various concentrates. Settling and filtration rates were observed to be typical for sulphide concentrates and moisture contents in final filter cakes were observed to be lower than expected.

 

Metallurgical testwork was completed to provide representative tailings samples for use in detailed solids settling and compaction testwork to provide data for tailings design studies.

  
Arctic ProjectPage 6
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

A detailed study of water treatment chemistry was undertaken to evaluate and confirm the option of destroying cyanide contained in solutions from the proposed copper–lead separation process. The use of an SO2/air process in a small-scale pilot plant demonstrated removal of 99% of the contained cyanide and supported the concept of maintaining low cyanide concentrations within the proposed tailings pond solutions.

 

In 2021, various metallurgical testwork programs were conducted at ALS Metallurgy, SGS, and MO Group. ALS Metallurgy completed several testwork programs, including flotation testing with the Preflotation circuit only to establish talc performance; further flowsheet development testwork to investigate the benefits of sequential flotation versus the original bulk flow sheet; and a variability testwork to support the development of improved metallurgical recovery models.

 

The objective of the ALS Metallurgy program was to investigate bulk and sequential flotation flowsheets with composites formed from two parent composites, and then select a flowsheet for a geo-metallurgical evaluation through testing with variability samples.

 

The mineralization was amenable to either a bulk flowsheet followed by copper-lead separation, or a sequential flowsheet, both following a pre-flotation stage to remove talc.

 

Table 1-1 shows average performance obtained for the Avg Talc Composite in the Flowsheet Development phase of the testing.

 

Table 1-1:Comparison of Bulk versus Sequential Locked-Cycle Test Results – ALS 2021

 

   Assays   Distribution (%) 
Composite  Cu
(%)
   Pb
(%)
   Zn
(%)
   Ag
(g/t)
   Au
(g/t)
   Mg
(%)
   Cu   Pb   Zn   Ag   Au 
Avg Talc Bulk                                                       
Copper concentrate   28.0    0.86    4.27    181    4.17    0.46    87.3    8.3    9.1    36.0    60.9 
Lead concentrate   7.90    39.0    6.30    1124    4.75    1.23    5.1    78.1    2.8    46.0    14.3 
Zinc concentrate   0.87    0.38    55.9    41    0.35    0.04    1.9    2.6    83.3    5.7    3.5 
Avg Talc – Sequential                                                       
Copper concentrate   27.6    0.87    2.05    168    3.23    1.96    90.2    8.9    4.7    34.9    48.7 
Lead concentrate   2.72    49.3    9.71    1360    5.31    1.40    1.2    69.9    3.1    39.4    11.2 
Zinc concentrate   0.98    1.09    54.5    47    0.77    0.17    2.1    7.3    83.5    6.5    7.7 

 

Copper recovery to the copper concentrate was slightly higher for the sequential flowsheet; however, gold recovery to the copper concentrate was substantially lower. The lead concentrate grade for the Avg Talc composite could likely be improved over that shown above with optimization of copper-lead separation conditions given the higher lead concentrate grade measured with other composites.

 

Zinc circuit performance was similar for the two flowsheets, although higher zinc recovery to the copper concentrate was recorded for the bulk circuit. Magnesium content in the copper concentrate was higher for the sequential circuit, but similar in the lead concentrate for both circuits.

  
Arctic ProjectPage 7
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Based on economic analysis comparing the bulk and sequential circuit, the bulk circuit flowsheet was selected for the Variability testing.

 

An overall metallurgical balance for the project is summarized in Table 1-2. The projected metallurgical recoveries are based on an expected average recovery over the life-of-mine (LOM), and results of metallurgical variability testwork conducted in 2021 and 2022.

 

Table 1-2:Summary of Overall Metal Recovery – Arctic Project

 

      Concentrate Grade   Metal Recoveries 
Process stream  Mass
(%)
   Cu
(%)
   Pb
(%)
   Zn
(%)
   Au
(g/t)
   Ag
(g/t)
   Cu
(%)
   Pb
(%)
   Zn
(%)
   Au
(%)
   Ag
(%)
 
Process Feed   100    2.1    0.5    2.8    0.4    31.1    -    -    -    -    - 
Copper Conc.   6.3    30.3    1.7    0.7    3.4    160.5    92.1    19.4    1.6    52.2    32.4 
Lead Conc.   0.6    2.0    53.9    5.9    14.1    2425.8    0.6    61.3    1.3    21.4    48.8 
Zinc Conc.   4.7    1.0    0.5    53.6    0.3    38.3    2.2    4.4    88.4    3.2    5.7 
Tailings   88.4    0.1    0.1    0.3    0.1    4.6    5.1    14.8    8.7    23.2    13.1 

 

SGS conducted SAG Power Index (SPI®) tests to investigate the effect of friable ores on the plant throughput.

 

MO Group conducted talc circuit modelling using the data obtained from the ALS Metallurgy Preflotation testwork program to investigate the benefits of talc circuit open and closed-circuit cleaning. The MO Group also conducted dewatering and filtration testwork on the talc concentrate and final tailings generated from the Preflotation testwork program.

 

Thickening and filtration testwork were completed by the MO Group on representative preflotation concentrate and tailings samples, to investigate opportunities to improve water recovery and reduce operating costs. The results were used to incorporate a tailings thickener in the process plant flow sheet.

 

1.10Mineral Resource Estimates

 

Mineral resource estimates are performed from a 3D block model based on geostatistical applications using Leapfrog software. The resource estimate was generated using drill hole sample assay results and the interpretation of a geological model which relates to the spatial distribution of copper, lead, zinc, gold, and silver. The grade models have been validated using a combination of visual and statistical methods. The resources were classified according to their proximity to the sample data locations and are reported using the standards and definitions of S-K 1300. Model blocks estimated by three or more drill holes spaced at a maximum distance of 100 m are included in the Indicated category. Inferred blocks are within a maximum distance of 150 m from a drill hole.

  
Arctic ProjectPage 8
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

The deposit is amenable to open pit extraction methods. The reasonable prospects for economic extraction was established by the constraining mineralization within a pit shell derived based on a series of technical and economic assumptions. Mineral Resources were established within the constraining pit shell using the copper equivalent (CuEq) grade of 0.5%.

 

Mineral Resources are reported in accordance with the standards and definitions of S-K 1300. The Mineral Resource estimate inclusive of Mineral Reserves is stated in Table 1-3. The Mineral Resource estimate exclusive of Mineral Reserves is stated in Table 1-4. All Indicated Mineral Resources have been converted to Mineral Reserves. Mineral Resources are reported in place (point of reference) and on a 100% basis; however, Trilogy’s attributable interest is 50% of the tonnes and metal content.

  
Arctic ProjectPage 9
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Table 1-3:Mineral Resource Summary Table, Inclusive of Mineral Reserves

 

      Average Grade   Contained Metal Content 
Confidence  Tonnage   Cu   Pb   Zn   Au   Ag   Cu   Pb   Zn   Au   Ag 
Category  (Mt)   (%)   (%)   (%)   (g/t)   (g/t)   (Mlb)   (Mlb)   (Mlb)   (koz)   (Moz) 
Indicated   35.7    2.98    0.79    4.09    0.59    45.2    2,347    621    3,216    675    52 
Inferred   4.5    1.92    0.70    2.93    0.43    35.6    189    69    288    62    5 

 

Notes:

 

1.Mineral Resources are current as of November 30, 2022 and were verified by a Wood QP.

2.Mineral Resources were prepared in accordance with the standards and definitions of S-K 1300.

3.Mineral Resources stated are contained within a conceptual pit shell developed using metal prices of $3.00/lb Cu, $0.90/lb Pb, $1.00/lb Zn, $1300/oz Au and $18/oz Ag and metallurgical recoveries of 92% Cu, 77% Pb, 88% Zn, 63% Au and 56% Ag and operating costs of $3/t mining and $35/t process and G&A. The assumed average pit slope angle is 43°.

4.The cut-off grade is 0.5% copper equivalent. CuEq = (Cu%x0.92) + (Zn%x0.290) + (Pb%x0.231) + (Au g/tx0.398) + (Ag g/tx0.005).

5.As a result of flattening the north end of the reserve pit to stabilize the pit wall due to the presence of talc, a portion of the reserve pit extended beyond the resource constraining pit shell. Approximately 568kt of 1.72% Cu, 0.77% Pb, 0.23 g/t Au and 21.3 g/t Ag in the Indicated category, and approximately 319 kt of 2.01% Cu, 0.87% Pb, 2.53% Zn, 0.50 g/t Au and 37.5 g/t Ag in the Inferred category were added to the Mineral Resource tabulation.

6.The Mineral Resource estimate is reported inclusive of those Mineral Resource that were converted to Mineral Reserves.

7. Trilogy’s attributable interest is 50% of the tonnage and contained metal stated in the table.

8.Figures may not sum due to rounding.

 

Table 1-4:Mineral Resource Summary Table, Exclusive of Mineral Reserves

 

      Average Grade   Contained Metal Content 
Confidence  Tonnage   Cu   Pb   Zn   Au   Ag   Cu   Pb   Zn   Au   Ag 
Category  (Mt)   (%)   (%)   (%)   (g/t)   (g/t)   (Mlb)   (Mlb)   (Mlb)   (koz)   (Moz) 
Inferred   4.5    1.92    0.70    2.93    0.43    35.6    189    69    288    62    5 

 

Notes:

 

1.Mineral Resources are current as of November 30, 2022 and were verified by a Wood QP.

2.Mineral Resources were prepared in accordance with the standards and definitions of S-K 1300.

3.Mineral Resources stated are contained within a conceptual pit shell developed using metal prices of $3.00/lb Cu, $0.90/lb Pb, $1.00/lb Zn, $1,300/oz Au and $18/oz Ag and metallurgical recoveries of 92% Cu, 77% Pb, 88% Zn, 63% Au and 56% Ag and operating costs of $3/t mining and $35/t process and general and administrative costs. The assumed average pit slope angle is 43º.

4.As a result of flattening the north end of the reserve pit to stabilize the pit wall due to the presence of talc, a portion of the reserve pit extended beyond the resource constraining pit shell and approximately 319 kt of 2.01% Cu, 0.87% Pb, 2.53% Zn, 0.50 g/t Au and 37.5 g/t Ag in the Inferred category were added to the Mineral Resource tabulation.

5.The cut-off grade is 0.5% copper equivalent: CuEq = (Cu% x 0.92) + (Zn% x 0.290) + (Pb% x 0.231) + (Au g/t x 0.398) + (Ag g/t x 0.005).

6.The Mineral Resource estimate is reported exclusive of those Mineral Resources that were converted to Mineral Reserves.

7. Trilogy’s attributable interest is 50% of the tonnage and contained metal stated in the table.

8.Figures may not sum due to rounding.

  
Arctic ProjectPage 10
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

1.11Mineral Reserve Estimates

 

Mineral Reserves were classified in accordance with the standards and definitions of S-K 1300. Modifying factors were applied to the Indicated Mineral Resources to convert them to Probable Mineral Reserves. Mineral Reserves for the Arctic deposit incorporate appropriate mining dilution and mining recovery estimations for the open pit mining method.

 

The pit shell that defines the ultimate pit limit was derived in Whittle using the Pseudoflow pit optimization algorithm. The optimization procedure uses the block value and pit slopes to determine a group of blocks representing pits of valid slopes that yield the maximum profit. The block value is calculated using information stored in the geological block model, commodity prices, mining and processing costs, process recovery, and the sales cost for the metals produced. The pit slopes are used as constraints for removal precedence of the blocks (Xiaoyu Bai, et al., 2017). Table 1-5 provides a summary of the primary optimization inputs.

 

Table 1-5:Optimization Inputs

 

Parameter  Unit  Value   Cu Conc.   Pb Conc.   Zn Conc. 
                    
Metal Prices 
Copper  $/lb   3.46          
Lead  $/lb   0.91          
Zinc  $/lb   1.12                
Gold  $/oz   1,615                
Silver  $/oz   21.17                
Discount Rate  %   8                
Dilution and Mine Losses  %   Estimated in a block-by-block basis, adding up 30% to 40%. 
Mining Cost 
Reference Bench Elevation  m   790                
Base Cost  $/t   2.52                
Incremental Mining Cost                       
Uphill (below 790m)  $/t/5m   0.02                
Downhill (above 790m)  $/t/5m   0.012                
Process Costs 
Operating Cost  $/t milled   18.31                
G&A  $/t milled   5.83                
Sustaining Capital  $/t milled   2.37                
Road Toll Cost  $/t milled   8.04                
Closure  $/t milled   4.27                
Processing Rate  kt/d   10                

  
Arctic ProjectPage 11
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Parameter  Unit   Value   Cu Conc.   Pb Conc.   Zn Conc. 
                     
Process Recovery
Copper   %         89.9    2.4    2.7 
Lead   %         8.1    79    2.2 
Zinc   %         3.4    0.4    90.6 
Gold   %         10.9    62.1    5.4 
Silver   %         26.4    63.1    3.4 
Payable – Main Element   %         96.5    95    85 
Treatment Cost   $/dmt         80    160    215 
Refining Cost
Copper   $/lb         0.08    -    - 
Gold   $/oz         5    10    - 
Silver   $/oz         0.5    1.25    - 
Transport Cost   $/dmt    271                
Concentrate Losses   % weight    0.42                
Insurance Cost   %    0.15                
Representation/Marketing   $/wmt    2.5                
Slope Angles
Geotechnical Sector 1 (2L-E)   degrees   Variable based on slope dip direction. IRA ranging from 26 to 56. 
Geotechnical Sector 2 (2L-W)   degrees   Variable based on slope dip direction IRA ranging from 38 to 56. 
Geotechnical Sector 3 (2U)   degrees   Variable based on slope dip direction IRA ranging from 29 to 56. 
Geotechnical Sector 4 (3)   degrees   Variable based on slope dip direction IRA ranging from 30 to 56. 
Geotechnical Sector 5 (4L)   degrees   Variable based on slope dip direction IRA ranging from 34 to 56. 
Geotechnical Sector 6 (4U)   degrees   Variable based on slope dip direction IRA ranging from 37 to 56. 
Royalties
NANA Surface Use   %NSR    1                

 

Note: IRA = inter ramp angle

  
Arctic ProjectPage 12
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

The Mineral Reserve estimates are shown in Table 1-6. Only Probable Mineral Reserves have been classified. The point of reference for the Mineral Reserves is defined at the point where the ore is delivered to the processing plant. Trilogy’s attributable interest is 50% of the tonnes of the Mineral Reserves.

 

Table 1-6:Mineral Reserve Statement

 

   Tonnage   Average Grade 
Confidence Category  Mt   Cu (%)   Pb (%)   Zn (%)   Au (g/t)   Ag (g/t) 
Probable Mineral Reserves   46.7    2.11    0.56    2.90    0.42    31.8 

 

Notes:

 

1.Mineral Reserves estimates are current as of November 30, 2022 and were prepared by a Wood QP.

2.Mineral Reserves were estimated assuming open pit mining methods and include a combination of internal and contact dilution. Total dilution is expected to be between 30% and 40%. Pit slopes vary by sector and range from 26° to 56°. A marginal NSR cut-off of $38.8 /t is used.

3.Mineral Reserves are based on prices of $3.46/lb Cu, $0.91/lb Pb, $1.12/lb Zn, $1,615/oz Au, and $21.17/oz Ag.

4.Variable process recoveries averaging 92.2% Cu in Cu concentrate, 62.2% Pb in Pb concentrate, 8887.6% Zn in Zn concentrate, 16.0% Pb in Cu concentrate, 1.9% Zn in Cu concentrate, 47.2% Au in Cu concentrate, 32.7% Ag in Cu concentrate, 0.8% Cu in Pb concentrate, 1.3% Zn in Pb concentrate, 26.1% Au in Pb concentrate, 48.7% Ag in Pb concentrate, 2.1% Cu in Zn concentrate, 4.5% Pb in Zn concentrate, 3.3% Au in Zn concentrate, 5.8% Ag in Zn concentrate.

5.Mineral Reserves are based on mining cost of $2.52/t incremented at $0.02/t/5m and $0.012/t/5m below and above 790 m elevation, respectively.

6.Costs applied to processed material following process operating cost of $18.31/t, G&A of $5.83/t, sustaining capital cost of $2.37/t, closure cost of $4.27/t, road toll cost of $8.04/t.

7.Strip ratio (waste: ore) is 7.3:1.

8.Selling terms following payables of 96.5% of Cu, 95% of Pb and 85% of Zn, treatment costs of $80/t Cu concentrate, $160/t Pb concentrate and $215/t Zn concentrate; refining costs of $0.08/lb Cu in Cu concentrate, $10/oz Au, $1.25/oz Ag in Pb concentrate; and transport cost $270.98/t concentrate.

9.Fixed royalty percentage of 1% NSR.

10. Trilogy’s attributable interest is 50% of the tonnage stated in the table.

 

Specific risks to the Arctic Mineral Reserve estimate include:

 

•The uncertainty in the construction and timing of the Ambler Mining District Industrial Access Project (AMDIAP) road, also called the Ambler Access Project (AAP), and whether a favourable road toll agreement can be negotiated.

 

•The presence of talc layers in the rock that have not been included in the current geological model could affect metallurgical recoveries and slope stability.

 

Other risk factors that may affect the Mineral Reserve estimates include: metal price assumptions; changes to the assumptions used to generate the NSR cut-offs that constrains the estimate; changes in local interpretations of mineralization geometry and continuity of mineralized zones; changes to geological and mineralization shapes, and geological and grade continuity assumptions; density and domain assignments; changes to geotechnical and hydrological assumptions, changes to mining and metallurgical recovery assumptions; changes to the input and design parameter assumptions that pertain to the conceptual pit constraining the estimates; assumptions as to concentrate marketability, payability and penalty terms; assumptions as to the continued ability to access the site, retain mineral tenure and obtain surface rights titles, obtain environment and other regulatory permits, and maintain the social license to operate.

  
Arctic ProjectPage 13
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

1.12Mining Methods

 

The Arctic Project is designed as a conventional truck-shovel operation with 144 t trucks and 15 m3 shovels. The pit design includes four nested phases to balance stripping requirements while satisfying the concentrator requirements.

 

The design parameters include a ramp width of 30 m, road grades of 10%, bench height of 5 m, targeted mining width between 70 m and 100 m, berm interval of 20 m, variable slope angles by sector and a minimum mining width of 30 m.

 

The smoothed final pit design contains approximately 46.7 Mt of ore and 340.2 Mt of waste for a resulting stripping ratio of 7.3:1. Within the 46.7 Mt of ore, the average grades are estimated to be 2.11% Cu, 2.90% Zn, 0.56% Pb, 0.42 g/t Au and 31.8 g/t Ag.

 

The scheduling constraints set the maximum mining capacity at 35 Mt/a, and the maximum process capacity at 10 kt/d. The production schedule based on the Probable Mineral Reserves shows a total LOM of 15 years, including 2 years of pre-production and 13 years of production.

 

1.13Processing and Recovery Methods

 

The 10,000 t/d process plant design is conventional for the industry and will operate two 12- hour shifts per day, 365 d/a with an overall plant availability of 92%. The process plant will produce three concentrates: 1) copper concentrate, 2) zinc concentrate, and 3) lead concentrate. Gold and silver are expected to be payable at a smelter; both silver and gold are expected to be payable in the copper and lead concentrates.

 

While there are several deleterious elements reporting to the concentrates at levels that could incur penalties, special processing provisions have been included in the flowsheet to make a readily saleable concentrate. The presence of naturally hydrophobic talc minerals was consistently observed in the various testwork programs. There is little reason to expect concentrates will be impaired by talc contamination as talc can be effectively removed from the flotation process prior to base metal flotation. Talc and fluorine levels will be managed by optimization of the talc pre-float circuit, effectively removing talc and fluorine to ensure the quality of the lead concentrate.

 

The mill feed will be hauled from the open pit to a primary crushing facility where the material will be crushed by a jaw crusher to a particle size of 80% passing 80 mm.

 

The crushed material will be ground by two stages of grinding, consisting of one SAG mill and one ball mill in closed circuit with hydrocyclones (SAB circuit). The hydrocyclone overflow with a grind size of approximately 80% passing 70 μm will first undergo talc pre-flotation, and then be processed by conventional bulk flotation (to recover copper, lead, and associated gold and silver), followed by zinc flotation. The bulk rougher concentrate will be cleaned and followed by copper and lead separation to produce a lead concentrate and a copper concentrate. The final tailings from the zinc flotation circuit will be pumped to a tailings management facility (TMF). Copper, lead, and zinc concentrates will be thickened and pressure-filtered before being transported by truck to a port and shipped to smelters.

 

Based on the mine plan developed for the Report and metallurgical testwork results, the LOM average metal recoveries and concentrate grades are as presented in Table 1-7.

  
Arctic ProjectPage 14
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Table 1-7:LOM Average Recovery and Grade

 

Description  Unit   Cu con  Pb con  Zn con 
LOM Production  t/a   234,132  23,300   174,202 
Grade  %   30.3% Cu  53.9% Pb   53.7% Zn 
Recovery  %   92.1% Cu
52.2% Au
32.5% Ag
  61.3% Pb
21.6% Au
48.6% Ag
   88.5% Zn 

 

The recovery plan includes provision for reagents, and water and power requirements.

  

1.14Infrastructure

 

1.14.1Infrastructure Requirements

 

The Project site is a remote, greenfield site that is remote from existing infrastructure. Infrastructure that will be required for the mining and processing operations will include:

 

•Open pit mine

 

•Stockpiles and Waste Rock Facility (WRF)

 

•Truck workshop, truck wash, mine offices, mine dry facility and warehouse

 

•Administration building

 

•Mill dry facility

 

•Plant workshop and warehouse

 

•Primary crushing building

 

•Fine ore stockpile building

 

•Process plant and laboratory

 

•Concentrate loadout building

 

•Reagent storage and handling building

 

•Raw water supply building

 

•Explosives storage silos and magazines

 

•Avalanche mitigation structures

 

•TMF

 

•Surface water diversion and collection channels, culverts, and containment structures

 

•Waste rock collection pond (WRCP)

 

•Water treatment plant (WTP)

  
Arctic ProjectPage 15
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

•Process pond

 

1.14.2Access

 

The Project site will be accessed through a combination of State of Alaska-owned highways (existing), an Alaska Industrial Development and Export Authority (AIDEA)-owned private road (proposed) and Ambler Metals-owned access roads (proposed). The AAP road is proposed by AIDEA to connect the Ambler Mining District to the Dalton Highway. The AAP road will be permitted as a private road with restricted access for industrial use. To connect the Arctic Project site and the existing exploration camp to the proposed AAP road, a 30.7 km access road (the Arctic access road) will need to be built.

 

The State of Alaska-owned, public Dahl Creek airport will require upgrades to support the planned regular transportation of crews to and from Fairbanks. The cost of these upgrades has been included in the capital cost estimate.

 

1.14.3Power

 

Power generation will be by five diesel generators, producing a supply voltage of 13.8 kV. The total connected load will be 25.9 MW with a normal running load of 21.0 MW. Diesel will be supplied via existing fuel supply networks in the region and shipped along the AAP road.

 

1.14.4Accommodation

 

The Project will require three self-contained camps, in two different locations, equipped with their own power and heat generation capabilities, potable WTP (PWTP), sewage treatment plant (STP), and garbage incinerator. The existing 90-person Bornite Camp currently used for exploration will be expanded and used to start the construction of the Arctic access road and the logistics yard and construction camp. This Bornite Camp will be expanded and available prior to surface access from the Dalton Highway via the AAP road is available. A 250-person construction camp (CC) will be constructed at location near the intersection of the AAP road and Arctic Mine Access road (AMA), across the road from the Logistics Yard. CC will be constructed when limited access via the AAP is available for the transport of camp modules. A 400-person Permanent Accommodations Facility (PAF) will be constructed in the same location as CC. The PAF will be constructed when the AAP is available to transportation of the modules by truck and will be operational by the peak accommodation requirements for the construction phase. CC will be adjacent to the PAF, and the accommodation sections will be integrated and operated with the kitchen, dining, and support facilities of the PAF. The PWTP, STP, and garbage incinerator will be transported to site and constructed with the CC and will be sized to support the future PAF and the capacities of both the CC and PAF (650-persons).

 

1.14.5Waste Rock Facility

 

The WRF will be developed north of the Arctic pit in the upper part of the Subarctic Creek valley. The WRF is designed as part of the tailings dam structure to provide a buttress for tailings containment in the adjacent footprint. The total volume of waste rock is expected to be 162.6 Mm3 (340 Mt); however, there is potential for expanded volume in the waste if placement density is <2.0 t/m3. The WRF will have a final height of 340 m to an elevation of 990 masl and is planned to be constructed in lifts of either 5, 10 or 20 m height with catch benches every 20 m to achieve an overall slope angle of 2.5H:1V.

 

Most of the waste rock is anticipated to be potentially acid-generating (PAG) and there will be no separation of waste based on acid generation potential. Rather, seepage from the WRF will be collected and treated.

  
Arctic ProjectPage 16
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

1.14.6Overburden Stockpiles

 

There will also be three overburden stockpiles to store the stripped topsoil and overburden from the TMF and WRF footprint. The topsoil stockpile will be placed between the haul roads to store up to 325,000 m3 while the overburden stockpile will be located south of the WRF to store up to 2,200,000 m3.

 

1.14.7Tailings Management Facility

 

The TMF will be located at the headwaters of Subarctic Creek, in the upper-most portion of the creek valley. The 59 ha footprint of the TMF will be fully lined with a geomembrane liner. Tailings containment will be provided by an engineered dam, buttressed by the WRF that will be constructed immediately downstream of the TMF, and the natural topography on the valley sides. A starter dam will be constructed to elevation 830 m. Three subsequent raises will bring the final dam crest elevation to 892 m, which is 98 m lower than the final elevation of the WRF. The TMF is designed to store approximately 37.4Mm3 (41.2 Mt) of tailings produced over the 13-year mine life, 3.3 Mm3 of additional pond water, as well as 1.5 times the probable maximum flood, with 2.5 m of freeboard.

 

1.14.8Water Management

 

The proposed mine development is located in the valley of Subarctic Creek, a tributary to the Shungnak River. A surface water management system will be constructed to segregate contact and non-contact water. Non-contact water will be diverted around mine infrastructure to Subarctic Creek. A groundwater seepage monitoring and collection system will be located down gradient of the WRF and seepage collection pond. Contact water will be conveyed to treatment facilities prior to discharge to the receiving environment.

 

A WRCP will be located directly below the toe of the WRF and will be used to collect seepage from the WRF, runoff from the WRF and haul road corridor area, and water pumped from the open pit.

 

The Project water and load balance model was updated to include the current water management plan. The model indicates that during operations, excess water from the WRCP will need to be treated prior to discharge to the receiving environment. During closure, water from the dewatering of the TMF will also need to be treated prior to discharge to the receiving environment.

 

1.14.9Water Treatment Plant

 

It was assumed the site will be assigned water quality-based effluent limits (WQBEL) matching the state’s Water Quality Standards (WQS) for the nearby Subarctic Creek. Therefore, Water Treatment Plant (WTP) is designed to treat all parameters in the predicted site wastewater to the WQS of Subarctic Creek. This will eliminate the need for a mixing zone and allow treated water to be discharged year-round if needed.

 

A single WTP, built in stages, will be used. During Operations phase the WTP will treat effluent from the Waste Rock Collection Pond (WRCP), and during Closure phase effluent from the pit. The WTP will initially consist of chemical/physical treatment with reverse osmosis (RO) filtration. During operations, the RO reject will be sent to the TMF, and only RO permeate will be discharged to Subarctic Creek. When the TMF is closed at the end of the operations, a biological/chemical/physical plant will be added to treat the RO reject. The biologic plant discharge will be mixed with the RO prior to discharge. 

  
Arctic ProjectPage 17
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

1.15Market Studies

 

Metal pricing was guided by 3-year trailing average prices and long-term price forecasts from analysts as published by CIBC in 2022.

 

The long-term consensus metal price assumptions selected for the economic analysis in the Report were:

 

•Copper: $3.65/lb

•Zinc: $1.15/lb

•Lead: $1.00/lb

•Gold: $1,650/oz

•Silver: $21.00/oz

 

Smelter terms were prepared in January 2023 by StoneHouse Consulting Inc. Smelter terms were applied for the delivery of copper, zinc and lead concentrate. It was assumed that delivery of all concentrates would be to a smelter in the Asia Pacific region at currently available freight rates. Total transport costs for the concentrate are estimated at $324.37/dmt.

 

1.16Environmental Studies, Permitting, and Plans, Negotiations, or Agreements with Local Individuals or Groups

 

The Arctic Project area includes the Ambler lowlands and Subarctic Creek within the Shungnak River drainage. A significant amount of baseline environmental data collection has occurred in the area including surface and groundwater quality sampling, surface hydrology monitoring, wetlands mapping, aquatic life surveys, avian and mammal habitat surveys, cultural resource surveys, hydrogeology studies, meteorological monitoring, and metal leaching and acid rock drainage (ML/ARD) studies.

 

1.16.1Permitting Considerations

 

Current mineral exploration activities are conducted at the Arctic deposit under State of Alaska and Northwest Arctic Borough (NWAB) permits. The State of Alaska Miscellaneous Land Use Permit (MLUP) and the NWAB Permit both expires at the end of 2022 and will be renewed.

 

Mine development permitting will be largely driven by the underlying land ownership with regulatory requirements varying depending on land ownership. The Arctic Project area includes patented mining claims owned by Ambler Metals (private land), NANA land (private land), and State of Alaska land.

 

The Arctic deposit is mainly on private lands owned by Ambler Metals and infrastructure for the Arctic Project is situated to a large extent on State land. It will be necessary to obtain a Plan of Operation Approval (which includes the Reclamation Plan and Closure Cost Estimate) from the Alaska Department of Natural Resources (ADNR). The Project will also require certificates to construct and operate dams (tailings and water storage) from the ADNR (Dam Safety Unit) as well as water use and discharge authorizations, an upland mining lease and a mill site lease, as well as several minor permits including those that authorize access to construction material sites from ADNR.

 

The Alaska Department of Environmental Conservation (ADEC) would authorize waste management under an Integrated Waste Management permit, air emissions during construction and operations under an air permit, and an Alaska Pollutant Discharge Elimination System (APDES) permit for any wastewater discharges, and a Multi-Sector General Permit for stormwater discharges. The ADEC would also be required to review the US Army Corps of Engineers (USACE) Section 404 permit to certify that it complies with Section 401 of the Clean Water Act (CWA).

  
Arctic ProjectPage 18
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

The Alaska Department of Fish and Game (ADF&G) would have to authorize any culverts or bridges that are required to cross fish-bearing streams or other impacts to fish-bearing streams that result in the altering or affecting fish habitat.

 

US Army Corps of Engineers (USACE) would require a CWA Section 404 permit for dredging and filling activities in Waters of the United States including jurisdictional wetlands. The USACE Section 404 permitting action would require the USACE to comply with the Natural Environmental Policy Act (NEPA) and, for a project of this magnitude, the development of an Environmental Impact Statement (EIS) is anticipated. The USACE would likely be the lead federal agency for the NEPA process. As part of the Section 404 permitting process, the Arctic Project will have to meet USACE wetlands guidelines to avoid, minimize and mitigate impacts to waters of the US including wetlands.

 

The Arctic Project will also have to obtain approval for a Master Plan from the NWAB. In addition, actions will have to be taken to change the borough zoning for the Arctic Project area from Subsistence Conservation and General Conservation to Resource Development and Transportation.

 

The overall timeline required for permitting would be largely driven by the time required for the NEPA process, which is triggered by the submission of the Section 404 permit application to the USACE. The timeline includes the development and publication of a draft and final EIS and ends with a Record of Decision and Section 404-permit issuance. In Alaska, the EIS and other State and Federal permitting processes are generally coordinated so that permitting and environmental review occurs in parallel. The NEPA process could require about three years to complete and could potentially take longer.

 

1.16.2Social and Community

 

The Arctic Project is located approximately 40 km northeast of the villages of Shungnak and Kobuk, and 65 km east-northeast of the community of Ambler. The population in these villages are 151 in Kobuk (2020 Census), 210 in Shungnak (2020 Census), and 275 in Ambler (2020 Census). Residents largely live a subsistence lifestyle with incomes supplemented by guiding, local development projects, employment through tribal and city councils, government aid, and employment both in and outside of their home villages.

 

The Arctic Project has the potential to significantly improve work opportunities for residents during the exploration phase, construction, and during full operation. Trilogy’s joint venture, Ambler Metals works directly with the Upper Kobuk villages and communities throughout the region to employ residents as mechanics, geotechnicians, core cutters, administrative staff, camp services, heavy equipment operators, drill helpers, and environmental technicians.

 

Stakeholder outreach and community meetings in the region by the Project’s owners over many years have provided the opportunity to engage with residents, provide updated information on the project and future plans for the UKMP, hear concerns, answer questions, and build relationships.

 

This engagement has also identified various hurdles residents have faced when applying for employment. Opportunities have been created for NANA shareholders to apply and receive educational scholarships, participate in job shadowing at Bornite, driver’s license courses, and heavy equipment operator training sponsored by the Project’s owners.

 

It is the company’s goal to continue and grow these efforts throughout the permitting process and the life of the project – encouraging and supporting education, job training, employment, and economic growth.

  
Arctic ProjectPage 19
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

1.16.3Closure Planning

 

Mine reclamation and closure are largely driven by State of Alaska regulations that specify that a mine must be reclaimed concurrent with mining operations to the greatest extent possible and then closed in a way that leaves the site stable in terms of erosion and avoids degradation of water quality from acid rock drainage or metal leaching on the site. A detailed Reclamation Plan will be submitted to the State of Alaska agencies for review and approval in the future, during the formal mine permitting process.

 

Owing to the fact that the Arctic Project is likely to have facilities on a combination of private (patented mining claims and native land) and State land, the Reclamation Plan will be submitted and approved as part of the Plan of Operations, which is approved by the ADNR. However, since the Reclamation and Closure Plan must meet regulations of both ADNR and the ADEC, both agencies will review and approve the Reclamation Plan. In addition, private landowners must formally concur with the portion of the Reclamation Plan for their lands so that it is compatible with their intended post-mining land use.

 

1.17Capital and Operating Cost Estimates

 

1.17.1Capital Costs

 

The capital cost estimate has an estimated accuracy of ±15% and uses Q3/Q4-2022 US dollars as the base currency. The total estimated initial capital cost for the design, construction, installation, and commissioning of the Arctic Project is estimated to be $1,177 million including ≤15% contingency. A summary of the estimated initial capital cost, sustaining capital cost and closure costs is shown in Table 1-8.

 

Table 1-8:Capital Cost Summary

 

WBS
Level 1
   WBS Level 1 Description  Initial Capex
($ M)
   Sustaining Capex
($ M)
   Total Capex
($ M)
 
1000   Mining   277.4    17.5    294.9 
2000   Crushing   42.5    0    42.5 
3000   Process Plant   158.0    1.3    159.3 
4000   Tailings   88.3    32.4    120.7 
5000   On-site Infrastructure   172.8    35.1    207.9 
6000   Off-site Infrastructure   75.8    0    75.8 
Sub-total Direct Costs   834.1    86.3    920.4 
7000   Indirects   177.4    15.1    192.5 
8000   Contingency (~12% of total project cost)   138.5    13.0    151.5 
9000   Owner’s Costs   26.8    0    26.8 
Sub-total Indirect Costs    342.7    28.1    370.8 
Project Total   1,176.8    114.4    1,291.2 
Project Total – Closure Costs             170.8 

  
Arctic ProjectPage 20
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

1.17.2Operating Costs

 

The operating cost estimates use US dollars as the base currency and have an accuracy of ±15% and include contingency. An average operating cost was estimated for the Arctic Project based on the proposed mining schedule. These costs included mining, processing, G&A, surface services, and road toll & maintenance costs. The average LOM unit operating cost for the Arctic Project is estimated to be $59.83/t milled. The breakdown of costs in Table 1-9 is estimated based on the LOM average mill feed rate of 3,650,000 t/a.

 

All pre-production costs have been included in the capital cost estimate in Section 1.1 above.

 

Table 1-9:Overall Operating Cost Estimate

 

Description  LOM Average Unit Operating Cost
($/ t milled)
   LOM Average Annual Cost
($ M/a)
   Percentage of Total Annual
Operating Costs
 
Mining*   22.49    82.1    37.6%
Processing   22.60    82.5    37.8%
G&A   5.85    21.3    9.8%
Road Toll and Maintenance   7.72    28.2    12.9%
Water Treatment   1.17    4.3    2.0%
Total Operating Cost   59.83    218.4    100%

 

* Excludes pre-production costs. Includes contingency which is less than 15%.

 

1.18Economic Analysis

 

The results of this economic analysis represent forward looking information. The results depend on the inputs that are subject to several known and unknown risks, uncertainties, and other factors that may cause actual results to differ materially from those presented in this section. Information that is forward looking includes mineral reserve estimates, commodity prices, the proposed mine production plan, construction schedule, projected recovery rates, proposed capital and operating cost estimates, closure cost estimates, toll road cost estimates, and assumptions on geotechnical, environmental, permitting, royalties, and hydrogeological information.

 

An economic analysis was undertaken on a 100% project ownership basis to determine the internal rate of return (IRR), net present value (NPV) and payback on initial investment of the Arctic Project. Trilogy holds 50% interest in the Arctic Project through its ownership in Ambler Metals. The Project consists of a three-year construction period, followed by 13 years of production.

 

Ausenco developed a pre-tax cash flow model for the Arctic Project and the NPV and IRR were calculated at the beginning of the construction period in Year -3.

 

The pre-tax financial model incorporated the production schedule and smelter term assumptions to produce annual recovered payable metal, or gross revenue, in each concentrate stream by year. Off-site costs, including the applicable refining and treatment costs, penalties, concentrate transportation charges, marketing and representation fees, and royalties were then deducted from gross revenue to determine the NSR. The operating cash flow was then produced by deducting annual mining, processing, G&A, surface services, and road toll & maintenance charges from the NSR. Initial and sustaining capital was deducted from the operating cash flow in the years they occur, to determine the net cash flow before taxes. Initial capital cost includes all estimated expenditures in the construction period, from Year -3 to Year -1 inclusive. First production occurs at the beginning of Year 1. Sustaining capital expenditure includes all capital expenditures purchased after first production, including mine closure and rehabilitation. The model includes an allocation of a 1% NSR attributable to NANA.

  
Arctic ProjectPage 21
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

With total capital costs of $1,719 million over LOM ($1,177 million initial capital cost, $114 million sustaining capital cost and $428 million closure costs), the project demonstrates a pre-tax NPV of $1,500 million at an 8% discount rate, IRR of 25.8% and payback period of 2.9 years. Post-tax financials have an NPV of $1,108 million at an 8% discount rate, IRR of 22.8% and payback period of 3.1 years.

 

1.19Interpretations and Conclusions

 

The Arctic deposit will be mined at an annual rate of 35 Mt of ore per year with an overall stripping ratio of 7.3. Ore will be processed by conventional methods to annually produce 234 kt of copper, 23 kt of lead, and 174 kt of zinc, all in concentrates for provision to third party refiners. Waste and tailings materials will be stored in surface facilities, which will be closed and reclaimed at the end of the mine; contact water will be treated and discharged to the environment throughout the LOM. Precious metals attendant with the concentrates will be largely payable. While there are deleterious elements reporting to the concentrates at levels that could incur penalties, special processing provisions have been included in the flowsheet to make a readily saleable concentrate.

 

In terms of project execution, the mine requires nominally two years of pre-strip operations, tailings pond starter dam development and water accumulation before actual production mining operations can commence.

 

For that pre-strip work to start, the Arctic access road from the AMDIAP intersection to the mine site will have to be constructed to at least a pioneer road condition that will allow the mine fleet and the support facilities to be delivered, built, and made operational.

 

Positive financial results support the declaration of Mineral Reserves.

 

1.20Recommendations

 

It is the QPs’ opinion that the identified technical and economic risks and uncertainly related to the property can be reduced and improved with the additional recommended work programs as outlined below, helping to continue developing the Project through engineering and de-risking, and into construction at a total cost of $14.4 million.

 

Table 1-10 and the following subsections summarize the key recommendations arising from a review of each major area of investigation completed as part of this study to improve the base case design.

  
Arctic ProjectPage 22
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Table 1-10:Summary of Recommended Work Packages

 

Description  Cost ($) 
Mining   1,073,000 
Geology and Resource Models   10,190,000 
Open Pit Geotechnical Work   150,000 
Hydrogeology   490,000 
Tailings Management Facility   1,420,000 
Closure   250,000 
Water Treatment   170,000 
Metallurgical Testing   175,000 
Recovery Methods   350,000 
Operational Readiness Plan   120,000 
Total   14,388,000 

 

1.20.1Mining

 

•Perform a SMU study to define an optimal block size that can support the envisioned production rate while minimizing dilution

 

•Requote explosives as Ammonium nitrate prices are currently in record highs due to the Ukraine-Russia conflict

 

•Assess the use of alternate fuel sources for the mine mobile equipment

 

•Confirm the location, thickness, and continuity of the talc layers near to the northeast wall of the final pit.

 

1.20.2Geology and Resource Models

 

•Bias in historical copper and lead assays: compare the current Mineral Resource estimate with an estimate prepared using a correction factor applied to the historic Cu and Pb assay values that remain in the assay database or an estimate that does not use these historical intervals

 

•Bias in predicted SG values: review methodology and dataset used to generate the predicted SG values to minimize or mitigate apparent bias

 

•Mineral Resource Classification confidence related to geological complexity: consider putting additional in-fill holes in drill grids to mitigate the risk of complex geology within the first 5 years of production. This is recommended to classify Measured Resources which can then be converted to Proven Mineral Reserves and provide high confidence in the production plan at project start and payback period.

  
Arctic ProjectPage 23
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

•Update the geological and resource model using all available data, including that from the 2022 drilling program

 

○Review and update variogram models for all metals and SG using all available data

 

○Review and update the resource model estimation parameters for all metals and SG

 

○Review the current compositing length of 1m that is more in agreement with the average sample length

 

○Update the geological model wireframes with all available data.

 

•Address minor database issues: transcription error checks, removing survey measurements causing excessive deviation, reviewing detection limits, and including additional fields to indicate if chosen values are supported by QC

 

1.20.3Open Pit Geotechnical work

 

•Update the 3D talc model to include all available drilling and laboratory testing data and complete a geotechnical review to update the slope designs

 

•Consider potential slope instability risks identified in the interim and final mining phases of the open pit design

 

•Re-evaluate seismic impact on the slope design

 

•Review the pore pressure monitoring system and mitigation plan as additional data becomes available, adopting mitigation efforts as appropriate.

 

1.20.4Hydrogeology

 

•Update the hydrogeological conceptual model for the pit and valley areas as more data becomes available

 

•For the pit, continue water level monitoring, assess potential effects of seasonal or rapid and high amplitude recharge events (i.e., freshet), assess pit sump locations, assess drainage ditches around and set back from the pit perimeter, consider snow removal or clearing off high elevation portions of the pit, update pit Groundwater Management Plan as mine design advances, and install general pit perimeter groundwater monitoring on the north, south and west sides of the pit.

 

•For the valley bottom, conduct hydrogeological drilling at location of the groundwater seepage interception system (SIS), update conceptual model, update estimates of potential groundwater bypass of the WRCP and the groundwater SIS design, and initiate baseline monitoring of groundwater quality around groundwater SIS.

 

1.20.5Tailings Management Facility

 

•Complete geotechnical and hydrogeological investigations in the foundations of the TMF, WRF, WRCP, and Process Pond including borehole drilling and laboratory testing

 

•Conduct Dam Breach Assessment, based on site specific hazard assessment for the TMF, the WRCP and Process pond

 

•Finite element consolidation and seepage modelling of the TMF

 

•Tailings deposition planning and water balance update

 

•Evaluate tailings consolidation and requirement for an underdrain system

 

•Update WRF, TMF, WRCP, and Process Pond stability analyses (including liquefaction assessment) based on additional field investigation results and lab testing

  
Arctic ProjectPage 24
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

•Evaluate whether heat or gas generation during oxidation of waste rock may adversely affect the closure cover.

 

1.20.6Closure

 

•Conduct revegetation and cover study, and conduct trials during operations to develop a revegetation program, including climatic variables

 

•Consult with the Alaska Plant Materials Center to develop a revegetation program utilizing native species to determine the optimal growth media depth, amendments, and soil cover to optimize plant survival.

 

1.20.7Water Treatment

 

•Review and adjust the WTP design as the discharge permitting advances and the actual permitted discharge criteria become more defined

 

•Continue to track and address identified project risks and opportunities

 

•Implement bench-scale and pilot-scale treatment tests to confirm high treatment rates required to meet the WQS and to right-size treatment equipment

 

•Evaluate RO reject treatment train once real mine-impacted water is generated during the operation phase

 

•Refine the acids and bases used in the WTP to reduce the risk of TDS WQS compliance issues

 

•Continue to refine WTP influent water quality predictions.

 

1.20.8Metallurgical testing

 

•Additional testwork to further refine metallurgical performance and recovery estimates for the flowsheet, including:

 

○Variability testing on samples with characteristics that match the LOM feed material

 

○Circuit flowsheet modifications to improve concentrate quality and reduce deleterious elements, where applicable

 

○Comminution testing on new samples to optimize comminution power.

 

1.20.9Recovery methods

 

•Capital cost optimization and a thorough review of equipment sizing/selection based on the geometallurgy outcomes.

 

1.20.10Operational Readiness Plan

 

•Develop a robust Operational Readiness (OR) plan to address risks and challenges associated with operating at a remote site:

 

○Review project and operating assumptions to take into consideration the impacts of labour availability and logistical challenges with availability of equipment

 

○Create a start-up/operational risk register to highlight issues for decisions taken during design

 

○Incorporate development and implementation considerations for the remote cold-weather project site with limited access.

  
Arctic ProjectPage 25
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

○Develop alternatives for supply, transportation and logistics for reagents, concentrate, and any other goods

 

○Track environment and operations-related permits to avoid costly alternatives

 

○Explore opportunities to develop synergies with existing businesses and build an “industrial base” required to sustain mining and processing operations

 

○Identify vendors to support contracts, parts, warehousing, training and first fills

 

○Consider strategic Human Resources (HR) staffing decisions such as innovative labour scheduling and local sourcing

 

○Identify Health, Safety, Environment and Community (HSEC) policies and procedures for a remote site to leverage local resources and other tie-ins where possible

 

○Early mobilization of key technical functions to support mining and operations.

  
Arctic ProjectPage 26
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

2INTRODUCTION

 

2.1Introduction

 

Trilogy Metals Inc. (Trilogy or Trilogy Metals) is listed on the Toronto Stock Exchange (TSX) and the New York Stock Exchange (NYSE). As a result, Trilogy is a reporting issuer in Canada and must comply with National Instrument 43-101 Standards of Disclosure for Mineral Projects (NI 43-101) and is a registrant with the United States Securities and Exchange Commission (SEC) and must also comply with subpart 229.1300 - Disclosure by Registrants Engaged in Mining Operations of Regulation S-K (S-K 1300).

 

Trilogy commissioned Ausenco Engineering Canada Inc. (Ausenco) to manage the update of the 2020 Arctic Feasibility Study Technical Report (2020 FS) prepared in accordance with NI 43-101 into a prefeasibility-level study (the Arctic Project) and summarize into a S-K 1300 Technical Report Summary (the Report) on the Arctic deposit in the Ambler Mining District of northwest Alaska.

 

The Arctic Project is directly held by Ambler Metals, a 50/50 joint venture formed between South32 and Trilogy in February 2020. Upon the formation of the joint venture, Trilogy contributed all of its Alaskan assets, including the Arctic Project and Trilogy's agreement with NANA (see Section 3.4.2), to Ambler Metals in exchange for a 50% ownership interest and at the same time, South32 contributed $145 million in cash for their 50% ownership interest.

 

2.2Terms of Reference

 

The firms and consultants who have provided updates and are co-authors of this Report are Ausenco, B&C, SRK and Wood.

 

The Report excludes the Bornite group of claims, which is a separate project and subject to a separate technical report summary.

 

All units of measurement in this Report are metric, unless otherwise stated.

 

The monetary units are in US dollars, unless otherwise stated.

 

Mineral Resources and Mineral Reserves are prepared in accordance with the standards and definitions of S-K 1300.

 

2.3Qualified Persons

 

Table 2-1 provides a list of the firms and individuals that acted as third party Qualified Persons (QPs) in the preparation of this Report.

 

Table 2-1:Report Contributors

 

Qualified Person Report Responsibilities Report Sections
Ausenco Plant and infrastructure design, metallurgy, recovery methods, consolidation of the capital costs and operating costs and the overall financial model 1.1, 1.3, 1.4, 1.9, 1.13, 1.14.1, 1.14.2, 1.14.3, 1.14.4, 1.15, 1.17, 1.18, 1.19, 1.20.8, 1.20.9, 1.20.10, 2, 3.1, 3.2, 3,10, 4, 5.3.8, 10, 14, 15.1, 15.2, 15.3, 15.4, 15.5, 15.6, 15.7, 15.10.8, 15.12, 15.13, 15.14, 15.15, 15.16, 16, 18.1.1, 18.1.2, 18.1.3, 18.1.4, 18.1.5, 18.1.7, 18.1.9, 18.1.10, 18.1.11, 18.1.12, 18.1.13, 18.1.14, 18.2.1, 18.2.3, 18.2.4, 18.2.5, 18.2.6, 19, 21, 22.1, 22.5, 22.9, 22.10, 22.12, 22.13, 22.14, 22.15, 22.16, 22.17.8, 22.17.9, 23.1, 23.9, 23.10, 23.11, 24, 25.1, 25.3, 25.5
B&C Water treatment 1.14.9, 1.20.7, 2.3, 15.9, 17.3.4, 17.3.6.2, 18.1.9.1, 18.2.6, 23.8, 25.2
SRK Tailings waste design, pit slope design, hydrology, water management, hydrogeology 1.14.6, 1.14.7, 1.14.8, 1.16.3, 1.20.3, 1.20.4, 1.20.5, 1.20.6, 2.3, 2.4, 3.7, 3.8, 3.9, 3.10, 5.3.7, 7.2.4, 8.1.2, 8.2.5, 13.9, 13.10.1, 13.11, 15.8, 15.10.1, 15.10.2, 15.10.3, 15.10.4, 15.10.5, 15.10.6, 15.10.7, 15.11, 17.3.1, 17.3.2, 17.3.3, 17.3.5, 17.6, 22.17.3, 22.17.4, 22.17.5, 22.17.6, 22.17.7, 23.4, 23.5, 23.6, 23.7, 25.2, 25.4
Wood Geology, mine design, mineral resource estimate, mineral reserve estimates 1.2.1, 1.5, 1.6, 1.7, 1.8, 1.10, 1.11, 1.12, 1.14.5, 1.20.1, 1.20.2, 2.3, 2.4, 2.5, 2.6, 3.3, 3.4, 3.5, 3.6, 3.10, 6, 7.1, 7.2.1, 7.2.2, 7.2.3, 7.2.5, 7.2.6, 7.2.7, 7.2.8, 8.1.1, 8.1.3, 8.1.4, 8.1.5, 8.1.6, 8.2.1, 8.2.2, 8.2.3, 8.2.4, 8.3, 9, 11, 12, 13.1, 13.2, 13.3, 13.4, 13.5, 13.6, 13.7, 13.8, 13.10, 17.1, 17.2, 18.1.6, 18.2.2, 22.2, 22.3, 22.4, 22.6, 22.7, 22.8, 22.17.1, 22.17.2, 23.2, 23.3, 25.2, 25.4, 25.5

  
Arctic ProjectPage 27
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

2.4Site Visits

 

Ausenco's process QP relied on information from another Ausenco QP's visit to the Arctic Project site on July 25, 2017, during which that QP inspected the property access, viewed the surface topography in the area proposed for the process plant and supporting infrastructure.

  

SRK's tailings QP visited the Arctic Project site from July 24-25, 2017, and July 10-12, 2018. He inspected property access and surface topography where the waste rock facility and tailings management facilities are to be located, as well as available space for other mine facilities.

 

SRK's geotechnical QP visited the Arctic Project site August 27-29, 2019. During the visit he reviewed selected drill core, and inspected the Arctic deposit discovery outcrop, 2019 drill pads at Arctic, and a talc outcrop.

  

Wood's geology and resource QP visited the Arctic Project site during August 29 to September 8, 2022. During the site visit, he observed the diamond drill core logging processes that include geology, structure and geotechnical logging, sampling, and specific gravity (SG) measurement process. He also visited Arctic site area, measured historical collar locations with a handheld global positioning system (GPS), reviewed representative drill cores, observed active drilling process. He visited drill core and pulp storage sites at camp and in Fairbanks office/warehouse.

 

Wood's mining QP visited the site on August 30, 2022. During the visit, Wood inspected the property access and viewed the surface topography in the areas proposed for the locations of the open pit, mine infrastructure and waste rock facility are to be located; inspected lithologies in selected drill cores that would support the pit walls; and observed talc outcrop and main foliation that could affect pit slope stability.

 

2.5Currency of Report

 

This Report is current as of November 30, 2022.

 

2.6Information Sources and References

 

Reports and documents listed in Section 2.7 and Section 24 were used to support the preparation of the Report. Additional information was sought from Trilogy where required.

 

Trilogy contributed to Sections 1.16, 2.3, 5, 17.1, 17.2, 17.3, 17.4, 18.1, 22.11 and 25 of this Report.

 

This is the first S-K 1300 Technical Report Summary filed by Trilogy on the Arctic Project.

 

  
Arctic ProjectPage 28
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

2.7Previous Reports

 

Previous reports filed by NovaGold and NovaCopper/Trilogy and available on SEDAR (www.sedar.com) include:

  

•Staples, P., Davis, B., MacDonald AJ., Austin, J., Sim, R., Boese, C., Murphy, B., and Sharp, T., Peralta Romero, A., 2020: Arctic Project, Northwest Alaska, USA, NI 43-101 Technical Report on Feasibility Study, report prepared by Ausenco Engineering Canada Inc. for Trilogy Metals Inc., effective date August 20, 2020.

 

•Staples, P., Hannon, J., Peralta Romero, A., Davis, B., DiMarchi, J., Austin, J., Sim, R., Boese, C., Murphy, B., and Sharp, T., 2018: Arctic Project, Northwest Alaska, USA, NI 43-101 Technical Report on Pre-Feasibility Study, report prepared by Ausenco Engineering Canada Inc. for Trilogy Metals Inc., effective date February 20, 2018.

 

•Davis, B., Sim, R., and Austin, J., 2017: NI 43-101 Technical Report on the Arctic Project, Northwest Alaska, USA: report prepared by BD Resource Consulting, Inc., SIM Geological Inc., and International Metallurgical & Environmental Inc. for Trilogy Metals Inc., effective date April 25, 2017.

 

•Wilkins, G., Stoyko, H.W., Ghaffari, H., DiMarchi, J., Huang, J., Silva, M., O’Brien, M.F., Chin, M., and Hafez, S.A., 2013: Preliminary Economic Assessment Report on the Arctic Project, Ambler Mining District, Northwest Alaska: report prepared by Tetra Tech for NovaCopper inc., effective date September 12, 2013.

 

•Rigby, N., White, R., Volk, J., Braun, T., and Olin, E.J., 2012: NI 43-101 Preliminary Economic Assessment Ambler Project Kobuk, AK: report prepared by SRK Consulting (US) Inc. for NovaCopper inc., effective date February 1, 2012.

 

•Rigby, N., and White, R., 2011: NI 43-101 Preliminary Economic Assessment Ambler Project Kobuk, AK: report prepared by SRK Consulting (US) Inc. for NovaGold Resources Inc., effective date May 9, 2011.

 

•Rigby, N., and White, R., 2008: NI 43-101 Technical Report on Resources Ambler Project Arctic Deposit, Alaska: report prepared by SRK Consulting (US) Inc. for NovaGold Resources Inc., effective date January 31, 2008.

 

2.8Abbreviations and Acronyms

 

A list of unit abbreviations is provided in Table 2-2 and an acronyms and abbreviations in Table 2-3.

 

Table 2-2:Unit Abbreviations

 

Abbreviation Definition Abbreviation Definition
% Percent km/h Kilometres per hour
‘ Minute (plane angle) km2 Square kilometer
“ Second (plane angle) kPa Kilopascal
< Less than kt Thousand tonnes
> Greater than kV Kilovolt
° Degree kW Kilowatt
°C Degrees Celsius kWh Kilowatt hour
°F Degrees Fahrenheit kWh/a Kilowatt hours per year (annum)
µm Microns kWh/t Kilowatt hours per tonne (metric ton)
A Ampere L Litres

  
Arctic ProjectPage 29
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Abbreviation Definition Abbreviation Definition
a Annum (year) L/m Litres per minute
ac Acre lb Pounds
B Billion lb/ton Pounds per ton
cfm Cubic feet per minute m Metres
cm Centimetre M Million
cm2 Square centimetre m2 Square metre
cm3 Cubic centimetre m3 Cubic metre
d Day masl Metres above sea level
d/a Days per year (annum) mg Milligram
d/wk Days per week mg/l Milligrams per litre
ft Feet mi Mile
ft2 Square foot min Minute (time)
ft3 Cubic foot mL Millilitre
ft3/s Cubic feet per second mm Millimetre
g Gram mo Month
g/cm3 Grams per cubic centimetre Mt Million tonnes
g/L Grams per litre MW Megawatts
g/t Grams per tonne MWh Megawatt hour
GPM US Gallons per minute oz Ounce
h Hour ppb Parts per billion
h/a Hours per year (annum) ppm Parts per million
h/d Hours per day psi Pounds per square inch
h/w Hours per week rpm Revolutions per minute
ha Hectare (10,000 m2) s Second (time)
hp Horsepower t Tonnes (metric - 1,000 kg)
in Inch ton Tons (imperial – 2,000 lb)
in2 Square inch t/a tonnes per year (annum)
in3 Cubic inch USG US Gallons
k Kilo (thousand) V Volt
kg Kilogram wk Week
kg/h Kilograms per hour y Year (annum)
kg/m2 Kilograms per square metre    
km Kilometre    

 

  
Arctic ProjectPage 30
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Table 2-3:Acronyms and Abbreviations

 

Acronym/Abbreviation Definition
AA Atomic Absorption
AACE Association for the Advancement of Cost Engineering

  
Arctic ProjectPage 31
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Acronym/Abbreviation Definition
AAP Ambler Access Project
AAS Atomic Adsorption Spectroscopy
ABA Acid Base Accounting
ADEC Alaska Department of Environmental Conservation
ADNR Alaska Department of Natural Resources
AES Atomic Emission Spectroscopy
AFD Approved For Design
AHEA Annual Hardrock Exploration Activity
AIDEA Alaska Industrial Development and Export Authority
AMA Arctic Mine Access
AMDIAP Ambler Mining District Industrial Access Project
AMJ Arctic Mine Junction
AMR Aphanitic Metarhyolite
AMLT Alaska Mining License Tax
ANCSA Alaska Native Claims Settlement Act
ANFO Ammonium Nitrate Fuel Oil
ANILCA Alaska National Interest Land Conservation Act
AP Acid Potential
APDES Alaska Pollutant Discharge Elimination System
ARD Acid Rock Drainage
AST Alaska State Income Tax
BCMC Bear Creek Mining Company
BFA Bench Face Angle
BMAL Bulk Mineral Analysis with Liberation
BV Bureau Veritas
BWi Ball Mill Work Index
CC Construction Camp
ChS Chlorite Schist
ChTS Chlorite Talc Schist
CSAMT Controlled Source Audio Magneto Telluric
CuEq Copper Equivalent
CWA Clean water act.
DCF Discounted Cash Flow
DDH Diamond Drill Hole
DGPS Differential GPS
DTY Dalton Transfer Yard
DWi Drop Weight Index
EGL Effective Grinding Length

  
Arctic ProjectPage 32
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Acronym/Abbreviation Definition
EIS Environmental Impact Assessment
EM Electromagnetic
EPCM Engineering, Procurement, and Construction Management
FA Fire Assay
FEL Front End Loaders (Loading)
FOS Factors of Safety
FS Feasibility Study
GISTM Global Industry Standard on Tailings Management
GOH Gross Operating Hours
GPS Global Positioning System
GS Grey Schist
HA Heavy ANFO
HCTs Humidity Cell Tests
HDPE High-density Polyethylene
HR Human Resources
HSEC Health, Safety, Environment and Community
ICP Inductively Coupled Plasma
ICP-MS Inductively Coupled Plasma Mass Spectroscopy
IP Induced Polarization
IPR Instantaneous Penetration Rates
IRA Inter Ramp Angle
IRR Internal Rate of Return
JV Joint Venture
KRC Kennecott Research Centre
LBMA London Bullion Market Association
LiDAR Light Detection and Ranging Survey
LME London Metal Exchange
LOM Life of Mine
MAR Mean Annual Runoff
MIBC Methyl Isobutyl Carbinol
ML Metal Leaching
MLUP Miscellaneous Land Use Permit
MMU Mobile Mixing (Manufacturing) Unit
MO Metso Outotec
MS Massive Sulphide
NAD North American Datum
NEPA natural environmental policy act
NI National Instrument

  
Arctic ProjectPage 33
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Acronym/Abbreviation Definition
NN Nearest Neighbour
NOH Net Operating Hours
NP Neutralization Potential
NPV Net Present Value
NSR Net Smelter Return
NWAB Northwest Arctic Borough
NYSE New York Stock Exchange
OR Operational Readiness
PAF Permanent Accommodations Facility
PAG Potentially Acid Generating
PE Professional Engineer
PEA Preliminary Economic Assessment
PFD Process Flow Diagram
PFS Pre-Feasibility Study
PGA Peak Ground Acceleration
PIMA Portable Infrared Mineral Analyzer
PMF Probable Maximum Flood
PoF Potential of Failure
PP Process Plant
PWTP Potable Water Treatment Plant
QA Quality Assurance
QC Quality Control
QPs Qualified Persons
RAA Resource Associates of Alaska
RF Revenue Factor
RFQ Request for Quotation
RMR Rock Mass Rating
RO Reverse Osmosis
ROD record of decision
ROM Run of Mine
RQD Rock Quality Designation
RTDs Rubber Tire Dozers
S-K 1300 Subpart 229.1300 – Disclosure by Registrants Engaged in Mining Operations in Regulations
SAB SAG/Ball
SAG Semi Autogenous Grind
SG Specific Gravity
SMC SAG Mill Comminution (?)
SMS Semi Massive Sulphide

  
Arctic ProjectPage 34
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Acronym/Abbreviation Definition
SPI Significant Potential Incidents
ST Sodium Tungsten
STP Sewage Treatment Plant
TAC Transportation Association of Canada
TCJA Tax Cuts & Jobs Act
TDEM Time Domain Electromagnetic
THH Top Head Hammer
THPVC Thompson Howarth Precision Versus Concentration
TIC Total Inorganic Carbon
TMF Tailings Management Facilities
ToC Time of Concentration
TS Talc Schist
TSX Toronto Stock Exchange
UCS Unconfined Compressive Strength
UKMP Upper Kobuk Mineral
USACE US Army Corps of Engineers
USFW US Fish and Wildlife
USGS US Geological Survey
UTM Universal Transverse Mercator
VAT Value Added Tax
VHF Very High Frequency
VMS Volcanogenic Massive Sulphide
VWPs Vibrating Wire Piezometers
WGM Watts, Griffis and McOuat
WQS Waste Rock Collection Pond
WQBEL Water Quality-Based Effluent Limits
WRCP Waste Rock Contact Pond
WRF Waste Rock Facility
WTP Water Treatment Plant

  
Arctic ProjectPage 35
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

3PROPERTY DESCRIPTION AND LOCATION

 

3.1Introduction

 

The Property is situated in the Ambler mining district of the southern Brooks Range, in the Northwest Arctic Borough (NWAB) of Alaska (Figure 3-1). The Property is located in Ambler River A-2 quadrangle, Kateel River Meridian T 20N, R 11E, section 2 and T 21N, R 11E, sections 34 and 35.

 

The Property is about 270 km east of the town of Kotzebue, 37 km northeast of the village of Kobuk, and 260 km west of the Dalton Highway, an all-weather State maintained public road, at geographic coordinates N67.17° latitude and W156.39° longitude and Universal Transverse Mercator (UTM) North American Datum (NAD) 83, Zone 4 coordinates 7453080N, 613110E.

 

Figure 3-1: Arctic Project Location Map

 

 

Source: Ambler Metals, 2022.

  
Arctic ProjectPage 36
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

3.2Property Ownership

 

The Property is directly held by Ambler Metals, a 50/50 joint venture formed between South32 and Trilogy in February 2020. Upon the formation of the joint venture, Trilogy contributed all of its Alaskan assets, including the Property to Ambler Metals in exchange for a 50% ownership interest and at the same time, South32 contributed $145 million in cash for a 50% ownership interest.

 

Prior to the joint venture formation, the Property was held 100% by a wholly owned subsidiary of Trilogy. Trilogy acquired the Property from NovaGold in 2011. In 2011, NovaGold transferred all copper projects to NovaCopper and subsequently spun-out NovaCopper to its then existing shareholders by way of a Plan of Arrangement in 2012. NovaCopper Inc. subsequently underwent a name change to Trilogy Metals Inc. in 2016.

 

3.3Mineral Tenure

 

The UKMP consists of an approximately 448,217-acre land package containing state, patented and native lands within an area of interest. There are two discrete mineralized belts within the UKMP - the Devonian Ambler Schist Belt and the Devonian Bornite Carbonate Sequence. The Property is located within the Ambler Schist Belt which comprises approximately 231,008 acres (93,446 ha) of State of Alaska mining claims and US Federal patented mining claims in the Kotzebue Recording District. Exclusive of native lands, the UKMP land tenure consists of 2,136 contiguous State claims totalling 230,736 acres (93,336 ha), including 905 40-acre claims, 1,231 160-acre claims, and 18 Federal patented claims comprising 271.9 acres (110 ha) held in the name of Ambler Metals. Claim locations are shown in Figure 3-2 to Figure 3-4 and listed in Appendix A. The Arctic deposit is located near the southern edge of the centre of the claim block shown in Figure 3-5, primarily within the Federal patented claims, which do not expire and provides exclusive rights to the locatable minerals, and in most cases, the surface and all resources.

 

The Federal patented claim corners were located by the US Geological Survey (USGS). In Appendix A, a total of 18 Federal patented claims are reported using the completed mineral survey MS 2245 which includes Federal patent number 50-81-0127 covering16 Federal patented claims (Arctic 1, 2, 4, 9, 11, 13, 15, 17, 19, 23, 24, 25, 26, 27, 28, and 29), and Federal patent number 50-83-0174 covering 2 Federal patented claims (Arctic 10 and 495). Figure 3 4 included the locations of the Federal patented claims. There is no expiration date or labour requirement on the Federal patented claims.

 

The UKMP also consists of lands owned by NANA Regional Corporation, Inc. (NANA), who controls lands granted under the Alaska Native Claims Settlement Act (ANCSA) to the south of the Property boundary. Ambler Metals and NANA are parties to an agreement dated October 19, 2011 (the NANA Agreement) that consolidates the parties' land holdings into an approximately 190,929 ha land package and provides a framework for the exploration and development of the area, including non-exclusive rights for surface access across NANA lands. The NANA Agreement has a term of 20 years, with an option in favour of Ambler Metals to extend the term for an additional 10 years.

 

Rent for each State claim is up to date and is paid annually to the ADNR. An Annual Labour Statement must be submitted to maintain the State claims in good standing.

  
Arctic ProjectPage 37
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Figure 3-2: Upper Kobuk Mineral Projects Lands

 

 

Source: Ambler Metals, 2022.

Note: NANA’s Bornite and ANCSA Lands are not part of the Arctic Property

  
Arctic ProjectPage 38
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

 

   
   

  

Figure 3-3: Arctic Project Mineral Tenure Plan

 

 

Source: Ambler Metals, 2022.

  
Arctic ProjectPage 39
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Figure 3-4: Mineral Tenure Layout Plan

 

 

Source: Ambler Metals, 2022.

  
Arctic ProjectPage 40
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

 

   
   

  

Figure 3-5: Arctic Deposit Location

 

 

Source: Ambler Metals, 2022.

  
Arctic ProjectPage 41
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

3.4Royalties, Agreements and Encumbrances

 

3.4.1Kennecott Agreements

 

The Kennecott Royalty Agreement dated effective January 7, 2010, was entered into by and among Kennecott, Alaska Gold Company and NovaGold. A copy of the Kennecott Agreement was recorded in the Kotzebue Recording District on January 8, 2010, as document no. 2010-000013-0.

 

The Kennecott Royalty Agreement documents a net smelter returns royalty that was reserved to Kennecott in a Purchase and Sale Agreement dated December 18, 2009, whereby Alaska Gold Company and NovaGold acquired mining properties from Kennecott. The mining properties referenced in the Kennecott Royalty Agreement consist of the Federal patented mining claims and many, but not all, of the State mining claims that are the subject of this Report.

 

Under the Kennecott Purchase and Termination Agreement, Kennecott retained a 1% NSR royalty that has been subsequently sold by Kennecott. The 1% NSR runs with the lands and is purchasable at any time from the royalty holder for a one-time payment of $10 million.

 

3.4.2NANA Agreement

 

In 1971, the US Congress passed the ANCSA which settled land and financial claims made by the Alaska Natives and provided for the establishment of 13 regional corporations to administer those claims. These 13 corporations are known as the Alaska Native Regional Corporations (ANCSA Corporations). One of these 13 regional corporations is NANA. ANCSA Lands controlled by NANA bound the southern border of the Arctic Project claim block (refer to Figure 3-5).

 

On October 19, 2011, Trilogy and NANA entered into the NANA Agreement for the cooperative development of their respective resource interests in the Ambler mining district. The NANA Agreement consolidates Trilogy’s and NANA’s land holdings into an approximately 142,831 ha land package and provides a framework for the exploration and development of the area. The NANA Agreement provides that NANA will grant Trilogy the nonexclusive right to enter on, and the exclusive right to explore, the Bornite Lands and the ANCSA Lands (each as defined in the NANA Agreement) and in connection therewith, to construct and use temporary access roads, camps, airstrips, and other incidental works.

 

The NANA Agreement has been assigned by Trilogy to Ambler Metals upon the formation of the joint venture.

 

The NANA Agreement has a term of 20 years, with an option in favour of Ambler Metals to extend the term for an additional 10 years. The NANA Agreement may be terminated by mutual agreement of the parties or by NANA if Ambler Metals does not meet certain expenditure requirements on NANA’s lands.

 

If, following receipt of a feasibility study and the release for public comment of a related draft EIS, Ambler Metals decides to proceed with construction of a mine on the lands subject to the NANA Agreement, Ambler Metals will notify NANA in writing and NANA will have 120 days to elect to either (a) exercise a non-transferrable back-in-right to acquire between 16% and 25% (as specified by NANA) of that specific project; or (b) not exercise its back-in-right, and instead receive a net proceeds royalty equal to 15% of the net proceeds realized by Ambler Metals from such project. The cost to exercise such back-in-right is equal to the percentage interest in the Arctic Project multiplied by the difference between (i) all costs incurred by Ambler Metals or its affiliates on the project, including historical costs incurred prior to the date of the NANA Agreement together with interest on the historical costs; and (ii) $40 million (subject to exceptions). This amount will be payable by NANA to Ambler Metals in cash at the time the parties enter into a joint venture agreement and in no event will the amount be less than zero.

  
Arctic ProjectPage 42
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

In the event that NANA elects to exercise its back-in-right, the parties will, as soon as reasonably practicable, form a joint venture with NANA electing to participate between 16% to 25%, and Ambler Metals owning the balance of the interest in the joint venture. Upon formation of the joint venture, the joint venture will assume all of the obligations of Ambler Metals and be entitled to all the benefits of Ambler Metals under the NANA Agreement in connection with the mine to be developed and the related lands. A party’s failure to pay its proportionate share of costs in connection with the joint venture will result in dilution of its interest. Each party will have a right of first refusal over any proposed transfer of the other party’s interest in the joint venture other than to an affiliate or for the purposes of granting security. A transfer by either party of a net smelter royalty return on the project or any net proceeds royalty interest in a project other than for financing purposes will also be subject to a first right of refusal.

 

In connection with possible development on the Bornite Lands or ANCSA Lands, Ambler Metals and NANA will execute a mining lease to allow Ambler Metals or a joint venture vehicle to construct and operate a mine on the Bornite Lands or ANCSA Lands. The mining lease will provide NANA with a 2% NSR as to production from the Bornite Lands and a 2.5% NSR as to production from the ANCSA Lands.

 

If Ambler Metals decides to proceed with construction of a mine on its own lands subject to the NANA Agreement, NANA will enter into a surface use agreement with Ambler Metals which will afford Ambler Metals access to the Arctic Project along routes approved by NANA (the Surface Use Agreement). In consideration for the grant of such surface use rights, Ambler Metals will grant NANA a 1% NSR on production and an annual payment of $755 per acre (as adjusted for inflation each year beginning with the second anniversary of the effective date of the NANA Agreement) and for each of the first 400 acres and $100 for each additional acre, of the lands owned by NANA and used for access which are disturbed and not reclaimed.

 

Figure 3-5 showed the locations of the Bornite and ANCSA Lands that are included in the NANA Agreement. The Bornite Lands are not considered to be part of the Arctic Project, because the mineralization styles identified to date in the Bornite Lands are distinctly different to the mineralization styles in the Ambler claims, and it is expected that any mining operation in the Bornite Lands would be developed as a stand-alone operation using different infrastructure.

 

3.5State Royalty

 

The owner of a State mining claim or lease will be obligated to pay a production royalty to the State of Alaska in the amount of 3% of net income received from minerals produced from the State mining claims.

 

This royalty does not apply to patented federal mining claims.

 

3.6Surface Rights

 

Surface use of the private land held as Federal patented claims is limited only by reservations in the patents and by generally applicable environmental laws. These do not restrict access or the ability to do work.

 

Surface use of State claims allows the owner of the mining claim to make such use of the surface as is “necessary for prospecting for, extraction of, or basic processing of minerals.”

  
Arctic ProjectPage 43
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

3.7Environmental Considerations

 

Environmental considerations are discussed in Section 17.

 

There may be some environmental liabilities associated with sites explored during the 1950s and 1960s. The exploration camp would require rehabilitation if the Arctic Project is closed.

 

3.8Permits

 

Permitting considerations for the Arctic Project are discussed in Section 17. Permits necessary to advance to the next stage are also discussed in Section 17.

 

There have been no significant violations or fines on the Property.

 

3.9Social Considerations

 

Social considerations for the Arctic Project are discussed in Section 17.

 

3.10Comment on Property Description and Location

 

The QPs consider that there are no other significant factors or material risks that may affect access, mineral tenure, title or the right or ability to perform work on the Property other than what is described in this Report. All mineral tenure, mining leases and crown land title are in good standing. Surface and aerial access to the project site is permitted and well-established. Permits to authorize work program activities are in place and applied for sufficiently in advance of work requirements. It is a reasonable expectation that any additional surface rights that would be required to support Arctic Project development and operations can be obtained through appropriate negotiation.

  
Arctic ProjectPage 44
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

4ACESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE and PHYSIOGRAPHY

 

4.1Accessibility

 

4.1.1Air

 

Primary access to the Property is by air, using both fixed wing aircraft and helicopters.

 

There are four well-maintained, approximately 1,500 m-long gravel airstrips located near the Arctic Project, capable of accommodating charter fixed wing aircraft. These airstrips are located 64 km west at Ambler, 46 km southwest at Shungnak, 37 km southwest at Kobuk, and 34 km southwest at Dahl Creek. There is daily commercial air service from Kotzebue to the village of Kobuk, the closest community to the Arctic Project. During the summer months, the Dahl Creek Camp airstrip is suitable for larger aircraft, such as a C-130 and DC-6.

 

In addition to the four 1,500 m airstrips, there is a 700 m airstrip located at the Bornite Camp. The airstrip at Bornite is suited to smaller aircraft, which support the Bornite Camp with personnel and supplies. There is also a 450 m airstrip (Arctic airstrip) located at the base of Arctic Ridge that can support smaller aircraft.

 

4.1.2Road

 

A winter trail and a one-lane dirt track suitable for high-clearance vehicles or construction equipment links the Bornite Camp to the Dahl Creek airstrip southwest of the Arctic deposit. An unimproved gravel track connects the Arctic airstrip with the Arctic deposit.

 

4.1.3Water

 

There is no direct water access to the Property. During spring runoff, river access is possible by barge from Kotzebue Sound to Ambler, Shungnak, and Kobuk via the Kobuk River.

 

4.2Climate

 

The climate in the region is typical of a sub-arctic environment. Weather conditions on the Property can vary significantly from year to year and can change suddenly. During the summer exploration season, average maximum temperatures range from 10°C to 20°C, while average lows range from -2°C to 7°C (Western Regional Climate Center: WRCC – Alaska Climate Summaries: Kobuk 1971 to 2000). By early October, unpredictable weather limits safe helicopter travel to the Arctic Project. During winter months, the Arctic Project can be accessed by snow machine, track vehicle, or fixed wing aircraft. Winter temperatures are routinely below -25°C and can exceed -50°C. Annual total precipitation (rainfall and snowfall) in the region averages 1,219 mm with the most rainfall occurring from July through September, and the most snowfall occurring from October through February.

 

It is expected that any future mining activity will be conducted on a year-round basis. Past exploration activities are generally confined to the period from late May to late September.

  
Arctic ProjectPage 45
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

4.3Local Resources and Infrastructure

 

The Property is currently isolated from major public infrastructure. Infrastructure assumptions including sources of water and electricity, and the proposed infrastructure layout for the Arctic Project are discussed in Section 15 of the Report.

 

The Property is approximately 270 km east of the town of Kotzebue, on the edge of Kotzebue Sound, 37 km northeast of the village of Kobuk, 260 km west of the Dalton Highway, and 470 km northwest of Fairbanks. Kobuk (population 191; 2020 US Census) is the location of one of the airstrips near the Arctic Project. Several other villages are also near the Arctic Project, including Shungnak located 46 km to the southwest with a population of 272 (2020 US Census) and Ambler, 64 km to the west with a population of 274 (2020 US Census). Kotzebue has a population of 3,102 (2020 US Census) and is the largest population centre in the Northwest Arctic Borough. Kotzebue is a potential source of limited mining-related supplies and labourers, and is the nearest centre serviced by regularly scheduled, large commercial aircraft (via Nome or Anchorage). In addition, there are seven other villages in the region that will be a potential source of some of the workforce for the Arctic Project. Fairbanks (population 32,515; 2020 US Census) has a long mining history and can provide most mining-related supplies and support that cannot be sourced closer to the Property.

 

Drilling and mapping programs are seasonal and have been supported out of the Bornite Camp and Dahl Creek Camp. The Bornite Camp facilities are located on Ruby Creek on the northern edge of the Cosmos Hills. The camp provides office space and accommodations for the geologists, drillers, pilots, and support staff. Power is supplied by two diesel generators. Water was supplied by the permitted artesian well located 250 m from camp; however, a water well was drilled in camp during the 2017 field season that was permitted by 2019 to provide all potable water for the Bornite Camp.

 

There is sufficient area within the Property to host an open pit mining operation, including mine and plant infrastructure, and waste rock and tailings management facilities.

 

4.4Physiography

 

The Property is located along the south slope of the Brooks Range, which separates the Arctic region from the interior of Alaska. Nearby surface water includes Subarctic Creek, the Shungnak and Kogoluktuk Rivers, the Kobuk River, and numerous small lakes. The Property is located at the eastern end of Subarctic Creek, a tributary of the Shungnak River to the west, along a ridge between Subarctic Creek and the Kogoluktuk River Valley. The Property area is marked by steep and rugged terrain with high topographic relief. Elevations range from 30 masl along the Kobuk River to 1,180 masl on a peak immediately north of the Arctic Project area. The divide between the Shungnak and Kogoluktuk Rivers in the Ambler Lowlands is approximately 220 masl.

 

The Kobuk Valley is located at the transition between boreal forest and Arctic tundra. Spruce, birch, and poplar are found in portions of the valley, with a ground cover of lichens (reindeer moss). Willow and alder thickets and isolated cottonwoods follow drainages, and alpine tundra is found at higher elevations. Tussock tundra and low, heath-type vegetation covers most of the valley floor. Intermittent permafrost exists on the Property.

 

Permafrost is a layer of soil at variable depths beneath the surface where the temperature has been below freezing continuously from a few to several thousands of years (Climate of Alaska 2007). Permafrost exists where summer heating fails to penetrate to the base of the layer of frozen ground and occurs in most of the northern third of Alaska as well as in discontinuous or isolated patches in the central portion of the State.

 

Wildlife in the Arctic Project area is typical of Arctic and subarctic fauna (Kobuk Valley National Park 2007). Larger animals include caribou, moose, Dall sheep, bears (grizzly and black), wolves, wolverines, coyotes, lynx and foxes. There are no anadromous fish species in the upper reaches of the Shungnak and Kogoluktuk Rivers due to natural fish barriers. Other fish species such as trout, sculpin, and grayling are common. The caribou seen on the Property belong to the Western Arctic herd that migrate once a year heading south in late August through October from their summer range north of the Brooks Range. The caribou migrate north in March from their winter range along the Buckland River to the north slope of the Brooks Range, a more westerly route and do not cross the Project during that migration.

  
Arctic ProjectPage 46
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

4.5Comments on Accessibility, Climate, Local Resources, Infrastructure and Physiography

 

In the opinion of the QP:

 

•The planned infrastructure, availability of staff, power, water, and communications facilities, the design and budget for such facilities, and the methods whereby goods could be transported to the proposed mine, and any planned modifications or supporting studies are reasonably well-established, or the requirements to establish such, are reasonably well understood by Trilogy, and can support the declaration of Mineral Resources and Mineral Reserves.

 

•There is sufficient area within the Property to host an open pit mining operation, including mine and plant infrastructure, and waste rock and tailings management facilities.

 

•It is a reasonable expectation that any additional surface rights that would be required to support Project development and operations can be obtained through appropriate negotiation.

 

•It is expected that any future mining operations will be able to be conducted year-round.

  
Arctic ProjectPage 47
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

5HISTORY

 

5.1Regional History

 

Prospectors in search of gold, travelling up the Kobuk River in 1898-99 (Grinnell, 1901), found several small gold placer deposits in the southern Cosmos Hills, south of the Arctic deposit, which were worked intermittently over the ensuing decades. Around this time, copper mineralization at Ruby Creek and Pardner Hill in the northern Cosmos Hills was explored using small shafts and adits (Smith and Eakin, 1911). In 1947, Rhinehart “Rhiny” Berg staked claims over the Ruby Creek prospects, carried out extensive trenching and the first diamond drilling, and constructed an airstrip for access (alaskamininghalloffame.org 2012). BCMC, an exploration subsidiary of Kennecott, optioned the Ruby Creek property from Berg in 1957. The prospect became known as Bornite and Kennecott conducted extensive exploration over the next decade, culminating in the discovery of the high-grade No. 1 zone and the sinking of an exploration shaft to conduct underground drilling.

 

While exploring the Bornite deposit, BCMC carried out reconnaissance exploration throughout the western Brooks Range, including a large regional stream sediment survey in 1962. Initial follow up did not identify mineralization of interest however in 1965, Riz Bigelow (BCMC) and his team of geologists found boulders of massive sulphides at an anomaly (1400 ppm Cu) located 28 km northeast of Bornite that led to the discovery of outcropping mineralization the following year. The area was subsequently staked and, in 1967, nine core holes were drilled at the Arctic deposit, eight of which yielded massive sulphide intercepts over an almost 500-m strike length.

 

BCMC conducted intensive exploration on the property until 1977 and then intermittently through to 1998. No drilling or additional exploration was conducted on the Property between 1999 and 2003.

 

In addition to drilling and exploration at the Arctic deposit, BCMC also conducted exploration at numerous other prospects in the Ambler Mining District (most notably Dead Creek, Sunshine, Cliff, and Horse). The abundance of Volcanogenic Massive Sulphide (VMS) prospects in the district resulted in a series of competing companies in the area, including Sunshine Mining Company, Anaconda Company, Noranda Exploration Company, GCO Minerals Company, Cominco American Resource Inc. (Cominco), Teck Cominco, Resource Associates of Alaska (RAA), Watts, Griffis and McOuat Ltd. (WGM), and Houston Oil and Minerals Company, culminating into a claim staking war in the district in 1973. Falconbridge and Union Carbide also conducted work later in the district.

 

District exploration by Sunshine Mining Company and Anaconda resulted in two additional significant discoveries in the district; the Sun deposit located 60 km east of the Arctic deposit, and the Smucker deposit located 36 km west of the Arctic deposit. These two deposits are outside the current Property.

 

District exploration continued until the early 1980s on the four larger deposits in the district (Arctic, Bornite, Smucker and Sun) when the district fell into a hiatus due to depressed metal prices.

 

In 1987, Cominco acquired the claims covering the Sun and Smucker deposits from Anaconda. Teck Resources Limited, as Cominco’s successor company, continues to hold the Smucker deposit. In 2007, Andover Mining Corporation purchased a 100% interest in the Sun deposit for $13 million and explored the property through 2013. The Sun deposit and adjacent lands were acquired by Valhalla Metals Inc., a private company, staked over the Sun deposit in 2017 after the creditors for the bankrupt Andover Mining Corporation failed to pay the annual rent of the state claims and submit the Annual Labour Statement.

  
Arctic ProjectPage 48
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

In 1981 and 1983, Kennecott received three US Mineral Survey patents (MS2245 totaling 240 acres over the Arctic deposit – later amended to include another 32 acres; and MS2233 and MS2234 for 25 claims totaling 516.5 acres at Bornite). The Bornite patented claims and surface development were subsequently sold to NANA Regional Corporation, Inc. in 1986.

 

No production has occurred at the Arctic deposit or at any of the other deposits within the Ambler Mining District.

 

5.2Prior Ownership and Ownership Changes – Arctic Deposit and the Ambler Lands

 

BCMC initially staked federal mining claims covering the Arctic deposit area beginning in 1966. The 1960’s drill programs defined a significant high-grade polymetallic resource at the Arctic deposit and, in the early 1970s, Kennecott began the patent process to obtain complete legal title to the Arctic deposit. In 1981, Kennecott received US Mineral Survey patent M2245 covering 16 mining claims totalling 240.018 acres. In 1983, US Mineral Survey patent M2245 was amended to include two additional claims totalling 31.91 acres.

 

With the passage of the Alaska National Interest Lands Conservation Act (ANILCA) in 1980, which expedited native land claims outlined in the ANSCA and State lands claims under the Alaska Statehood Act, both the State of Alaska and NANA selected significant areas of land within the Ambler Mining District. State selections covered much of the Ambler schist belt, host to the VMS deposits including the Arctic deposit, while NANA selected significant portions of the Ambler Lowlands to the immediate south of the Arctic deposit as well as much of the Cosmos Hills including the area immediately around Bornite.

 

In 1995, Kennecott renewed exploration in the Ambler schist belt containing the Arctic deposit patented claims by staking an additional 48 state claims at Nora and 15 state claims at Sunshine Creek. In the fall of 1997, Kennecott staked 2,035 state claims in the belt consolidating their entire land position and acquiring the majority of the remaining prospective terrain in the VMS belt. Five more claims were subsequently added in 1998. After a short period of exploration which focused on geophysics and geochemistry combined with limited drilling, exploration work on the Arctic Project again entered a hiatus.

 

On March 22, 2004, Alaska Gold Company, a wholly-owned subsidiary of NovaGold completed an Exploration and Option Agreement with Kennecott to earn an interest in the Ambler land holdings.

 

5.3Previous Exploration and Development Results – Arctic Deposit

 

5.3.1Introduction

 

Kennecott’s ownership of the Property saw two periods of intensive work from 1965 to 1985 and from 1993 to 1998, before optioning the property to NovaGold in 2004.

 

Though reports, memos, and files exist in Kennecott’s Salt Lake City office, only limited digital compilation of the data exists for the earliest generation of exploration at the Arctic deposit and within the VMS belt. Beginning in 1993, Kennecott initiated a re-evaluation of the Arctic deposit and assembled a computer database of previous work at the Arctic deposit and in the district. A computer-generated block model was constructed in 1995 and an updated resource estimate was preformed using from block model. Subsequently, Kennecott staked a total of 2,035 State of Alaska claims in 1997 and, in 1998 undertook the first field program since 1985.

  
Arctic ProjectPage 49
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Due to the number of companies and the patchwork exploration that occurred as a result of the 1973 staking war, much of the earliest exploration work on the Ambler Schist belt was lost during the post-1980 hiatus in district exploration. The following subsections outline the best documented data at the Arctic deposit as summarized in the 1998 Kennecott exploration report, including the assembled computer database; however, this outline is not considered to be either exhaustive or in-depth.

 

In 1982, geologists with Kennecott, Anaconda and the State of Alaska published the definitive geologic map of the Ambler schist belt (Hitzman et al. 1982).

 

Table 5-1 lists known exploration mapping, geochemical, and geophysical programs conducted for VMS targets in the Ambler Mining District.

  
Arctic ProjectPage 50
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Table 5-1: Known Mapping, Geochemical, and Geophysical Programs Targeting VMS Prospects in the Ambler Mining District

 

Area Prospects Company Mineralization Mapping Soil Geochem Geophysics Reports
Arctic Center of the Universe (COU) Back Door Arctic BCMC-KEX Two (or more) sulphide bands with thickness up to ~40 m with Zn, Cu, Pb, Ag, Au, ±Ba mineralization. Proffett 1998; Lindberg and others 2004, 2005; NG personnel 2008 at 1:2,000 scale Extensive 2006 NG program (>670 samples) Numerous surveys including the 1998 Dighem EM and Mag aerial surveys, 1998 CSAMT survey, TEM downhole and surface surveys in 2005, TDEM ground survey in 2006 Numerous
COU Back Door, 4th of July Creek NG-Anaconda No exposed or drilled mineralization, target is the projection of the Arctic horizon NG 1:2,000 mapping in 2006 Extensive 2006 NG program 4 TDEM ground surveys in 2005 and 2006 2005 and 2006 NG Progress Reports; Lindberg’s 2005 report
Sunshine Bud CS Sunshine Creek BCMC and BCMC-Noranda Disseminated to semi-massive lens up to 18 m thick. Upper mineralized limb is Ba-rich BCMC 1983; Paul Lindberg 2006; NG 2011 Numerous eras of soil sampling, most recent 1998 by Kennecott (Have data) and 2006 by NG BCMC completed Recon IP survey and Crone vertical shoot back EM in 1977, 2 TDEM surveys to the NW Various BCMC reports; Lindberg’s 2006 Sunshine progress report; 2006 NG Progress report
Bud-CS SMC and TAC Au-rich gossan and 3+ m intercept of 1.7% Cu, 0.4% Pb, 1.5% Zn, 2 oz/ton Ag, 0.017 oz/ton Au Anaconda (TAC) and Sunshine (SMC) SMC soil sampling Anaconda completed downhole resistivity survey in 1981 on Bud 7 1981 through 1983 Anaconda Progress reports

  
Arctic ProjectPage 51
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Area Prospects Company Mineralization Mapping Soil Geochem Geophysics Reports
Dead Creek Shungnak SK Shungnak (Dead Creek) BCMC, Cominco Thin (0.1 to 3 m) disseminated to semi-massive lenses of Cu, Zn, Pb, Ag mineralization Bruce Otto and others 2006; Proffett 1998 NG in 2006 (355 samples); KEX in 1998 (~240 samples) 2 CEM surveys by BCMC at DH with no anomalous responses (do not have data) 2006 NG report; 1982 and 1983 Anaconda Ambler Progress reports
SK GCO and BCMC/GCO-HOMEX JV Mineralized float up to 0.4% Cu, 4.8% Pb, 8.7% Zn, 5 oz/ton Ag BCMC BCMC 1982 soil grid CEM and Max-min completed by BCMC (do not have data) 1982 Annual Progress Report, BCMC; Bruce Otto 2006 Memo
Horse Cliff DH Horse-Cliff DH Horse – BCMC, Cliff SMC, DH – BCMC and BCMC/GCO-HOMEX Disseminate to semi-massive with local massive lens, thicknesses up to tens of feet. KEX 1983 1:1000 prospect map SMC soil surveys 1976-1978 and 1980 No known ground-based survey; occurrences within a large resistivity high 1985 Progress Report BCMC-GCO-Homex J; 1980 Summary of Ambler Field Investigations – Sunshine Mining, Horse Creek Memo – Robinson 1981; 1978 Ellis Geologic Evaluation and Assessment of the Northern Belt Claims

Snow Ambler RB Nani Frost

 

 

 

Snow Cominco Ag-Pb-Zn mineralization as massive and semi-massive bands hosted within thin bands of graphitic schist (GS). Noranda-Cominco scanned map with no 72eochem72enced; Prospect scale KEX Soil gird in 1997 or 1998 No known ground-based survey; Anaconda completed downhole resistivity survey in 1981 on Ambler-4 “Snow Prospect Miscellaneous Notes and Maps.pdf” is only known report

  
Arctic ProjectPage 52
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Area Prospects Company Mineralization Mapping Soil Geochem Geophysics Reports
  Ambler Anaconda TAC Massive, disseminated chalcopyrite and pyrite associated with chert Numerous Anaconda geologists; no digitized maps Only scattered soils in database Max-min surveys, no data is available 1983 Ambler River Memo (Sunshine Progress Report); 1982 Anaconda Progress Report
Nani-Frost BCMC and BCMC-Noranda Outcrops of 2-3 m of 0.8% Cu, 0.4% Pb, 1.2% Zn, 0.05 oz/ton Ag within felsic schist BCMC (do not have data) BCMC identified numerous weak soil anomalies (do not have data) CEM, Max-min, and PEM completed by BCMC (do not have data) 1982 Annual Progress Report, BCMC
Red Nora Nora BCMC/GCO-HOMEX Disseminated chalcopyrite within chlorite altered volcanics in two zones (Sulphide Gulch and Northern Horizon) Generalized geologic map created by WGM for BCMC-GCO-HOMEX No known data Two PEM over the Sulphide Gulch horizon 1984 and 1985 Progress Report BCMC-GCO-Homex JV
Red BCMC Thin discordant bands of sphalerite, chalcopyrite, galena, and pyrrhotite with calcite and fluorite cutting ‘siltites’ and metacarbonates None KEX soil lines 1998 KEX identified EM anomalies 1998, follow-up gravity and Max-min EM; TDEM survey in 2006; DIGHEM helicopter EM and radiometric survey in 2006 Kennecott’s final 1998 field report; 2006 NG Progress Report

  
Arctic ProjectPage 53
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Area Prospects Company Mineralization Mapping Soil Geochem Geophysics Reports
Other BT, Jerri Creek Anaconda, AMC Massive sulphide bands up to 1.5 m thick extend nearly 2.3 km along an E-W strike Hitzman and others Historic soils at Jerri Creek No known surveys. Hitzman thesis and Anaconda (BT) and Bear Creek (Jerri) Assessment reports; 1982 and 1983 Anaconda Ambler Progress reports
Kogo-White Creek Bud – SMC or AMC Discovered by hydrochemistry of high Cu ions in White Creek. SMC? Soil 74eochem surveys by SMC in 1978 and KEX in 1998 Recon IP survey in 1977; Max-Min Mag survey in 1980; Follow-up Max-Min and gravity by KEX in 1998; TDEM by NG in 2006. 1980 Summary of Ambler Field Investigations, SMC; Kennecott’s Final 1998 Field Report
Pipe BCMC and SMC Podiform zones of sulphide mineralization within calc-schists and QMS Schmidt in 1978, SMC in 1982 Kennecott soil grid in 1997-1998 Not known Schmidt’s 1978 report (Part IV) for Anaconda’s (?) annual report

  
Arctic ProjectPage 54
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Area Prospects Company Mineralization Mapping Soil Geochem Geophysics Reports
  Tom Anaconda and SMC 1982 ‘Discovery’ trench by SMC uncovered massive sulphide boulders with up to 6 oz/ton Ag, 5.4% Pb, 6.3% Zn, only 0.2% Cu Sunshine in 1982 (?) SMC soils in 1982 Gamma mag survey by SMC in 1982; TDEM by NG in 2006. 1982 Sunshine Mining Company Memo by E.R. Modroo; Schmidt’s 1978 report (Part IV) for Anaconda’s (?) annual report
Sun Sun-Picnic Creek Anaconda – AMC-Cominco; Valhalla Metals is current owner Three zones of sulphide mineralization varying from 1 to 10 m; Upper zone is Zn-Pb-Ag rich while the two lower zones are Cu rich Various Anaconda geologists Not known, but most likely extensive Not known, but most likely extensive 1981 Anaconda progress report; Anaconda 1977 prefeasibility study (not in NG possession)
Smucker Smucker-Charlie-Puzzle-4B-Patti Anaconda, Cominco, and Bear Creek; now owned by Teck A single mineralized Ag-Zn-Pb-Cu horizon varying from 1 to 8 m in thickness Detailed mapping by Anaconda and BCMC geologists Strong soil 75eochem anomalies in lowlands SE of Smucker horizon; Kennecott soil grid in 1997 or 1998 Not known 1985 Progress Report BCMC-GCO-Homex JV

 

Note: EM = electromagnetic; TDEM = time domain electromagnetic; CSAMT = Controlled Source Audio Magnetotelluric.

  
Arctic ProjectPage 55
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

5.3.2Geochemistry

 

Historical geochemistry for the district, compiled in the 1998 Kennecott database, includes 2,255 soil samples, 922 stream silt samples, 363 rock samples, and 37 panned concentrate samples. Data have been sourced from several companies including Kennecott, Sunshine Mining, RAA, and NANA. Sourcing of much of the data had been poorly documented in the database.

 

During 1998, Kennecott renewed its effort in the district, and, as a follow-up to the 1998 electromagnetic (EM) survey, undertook soil and rock chip sampling in and around EM anomalies generated in the geophysical targeting effort. During this period Kennecott collected 962 soils and 107 rocks and for the first time used extensive multi-element inductively coupled plasma (ICP) analysis.

 

5.3.3Geophysics

 

Prior to 1998, Kennecott conducted a series of geophysical surveys which are poorly documented or are unavailable to Ambler Metals. With the renewed interest in the belt, Kennecott carried out a helicopter-supported airborne EM (five frequency DIGHEM system) and magnetic survey covering approximately a 70 km stretch of the Ambler belt in March 1998. A total 2,509-line kilometres was flown using 400 m line spacing except at the Arctic deposit where 200 m line spacing was used. The Arctic deposit presented a strong 900 Hz EM conductive signature. From the initial interpretation of the airborne EM data a two-year ground follow-up program to evaluate and drill test the best targets was recommended (Fueg, 1998).

 

During the summer of 1998, Kennecott carried out a well-planned and systematic ground follow-up program. Of the 46 EM anomalies that were identified 17 were ranked A and B and were mapped and evaluated in the field: 12 using soil geochemistry, 9 using a combination of ground EM (Maxmin 2 horizontal loop) and gravity (LaCoste and Romberg Model G gravimeter), and two anomalies were drilled. Eight of the 17 anomalies occurred in prospective geology and coincident anomalous geochemistry and two were drilled in the same summer (Kennecott, 1998).

 

At anomaly 98-3, later named East Dead Creek, located approximately 6 km northwest of the Arctic deposit and 2 km east-northeast of the Dead Creek prospect, Kennecott found sub-cropping gossan roughly coincident with the centre of their airborne and ground EM anomalies. A single vertical hole encountered semi-massive sulphides in three intervals in the upper 40 m of the hole, the best being 0.8% Zn, 0.35% Cu and 0.16% Pb over 15 feet (Kennecott, 1998).

 

Based on the results of the 1998 program, Kennecott made the following recommendations: anomaly 98-3 required further drilling, two other anomalies were drill ready, and five other anomalies, including anomaly 98-9, required additional exploration to define a drill target. Despite the encouraging regional exploration results, Kennecott conducted no further field exploration in the district after 1998 and subsequently optioned the property to NovaGold in 2004.

 

In addition to the regional program, Kennecott completed five lines of controlled source audio magneto telluric (CSAMT) data in Subarctic Valley. The Arctic deposit showed an equally strong conductive response in the CSAMT data as was seen in the EM data. As a result of the survey, Kennecott recommended additional CSAMT for the deposit area.

 

5.3.4Drilling

 

Between 1967 and July 1985, Kennecott (BCMC) completed 86 holes (including 14 large diameter metallurgical test holes) totalling 16,080 m. In 1998, Kennecott drilled an additional six core holes totalling 1,492 m to test for:

 

•Extensions of the known Arctic mineralization.

  
Arctic ProjectPage 56
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

•Grade and thickness continuity.

 

•EM anomaly 98-3 (East Dead Creek).

 

Drilling for all BCMC/Kennecott campaigns in the Arctic deposit area (1966 to 1998) totals 92 core holes for a combined 17,572 m (refer to Section 7 for additional information).

 

5.3.5Specific Gravity

 

Prior to 1998, no SG measurements were available for the Arctic deposit rocks. A “factored” average bulk density was used to calculate a tonnage factor for resource estimations. A total of 38 samples from the 1998 drilling at the Arctic deposit were measured for SG determinations. Additional information on density determinations is provided in Section 8.

 

5.3.6Petrology, Mineralogy, and Research Studies

 

There have been numerous internal studies done by Kennecott on the petrology and mineralogy of the Arctic deposit that exist as internal memos, file notes, and reports from as early as 1967. These data have been used in support of geological and mineralogical interpretations.

 

Portable infrared mineral analyzer (PIMA) alteration studies by Kennecott on a limited amount of core show that hydrothermal alteration (Na/Ba-rich micas) can still be spectrally recognized despite later regional metamorphism and continued use was recommended to assist in the structural interpretation of the known mineralization and in tracing the ‘ore horizon’.

 

D. Schmandt completed an undergraduate thesis at Smith College in 2009 entitled “Mineralogy and origin of Zn-rich horizons within the Arctic Volcanogenic Massive Sulphide deposit, Ambler District, Alaska”. Jeanine Schmidt completed a doctoral dissertation at Stanford University in 1983 entitled “The Geology and Geochemistry of the Arctic Prospect, Ambler District, Alaska”; and Bonnie Broman completed a master’s thesis at University of Alaska, Fairbanks in 2014 entitled “Metamorphism and Element Redistribution: Investigations of Ag-bearing and associated minerals in the Arctic Volcanogenic Massive Sulphide deposit, SW Brooks Range, NW Alaska”. These studies have provided additional information on geological and mineralogical settings in the Arctic Project area.

 

5.3.7Geotechnical, Hydrogeological and Acid-Base Accounting Studies

 

A series of geotechnical, hydrological, hydrogeological, and acid-base accounting (ABA) studies were conducted prior to the 2020 FS. Rock geotechnical and hydrogeological studies completed after 1998 are listed in Table 5-2. ABA studies completed after 1998 are listed in Section 13.11.1.

 

5.3.7.1Geotechnical and Hydrogeological Studies

 

In December 1998, URSA Engineering prepared a geotechnical study for Kennecott titled “Arctic Project – 1998 Rock Mass Characterization”. Though general in scope, the report summarized some of the basic rock characteristics as follows:

 

•Compressive strengths average 6,500 psi for the quartz mica schists, 14,500 psi for the graphitic schists, and 4,000 psi for talc schists.

  
Arctic ProjectPage 57
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

•Rock mass quality can be described as average to good quality, massive with continuous jointing except the talc schist, which was characterized as poor quality. The rock mass rating (RMR) averages 40 to 50 for most units except the talc schist which averages 30.

 

In 1998, Robertson Geoconsultants, Inc. (Robertson) of Vancouver prepared a report for Kennecott titled “Initial Assessment of Geochemical and Hydrological Conditions at Kennecott’s Arctic Project”. The report presented the results of the acid generation potential of mine waste and wall rock for the Arctic Project in the context of a hydrological assessment of the climate, hydrology, and water balance analyses at the Arctic deposit. Climatic studies at the time were limited to regional analyses as no climatic data had been collected at the Arctic Project site prior to the review. Regional data, most specifically a government installed gauging station about 32 km to the southwest at Dahl Creek, provided information in assessing the hydrology of the Arctic Project at the time. A total of nine regional gauges were utilized to evaluate the overall potential runoff in the area.

 

Table 5-2: Summary of Previous Geotechnical and Hydrogeological Work Completed After 1998

 

  Rock Geotechnical Hydrogeological
Field Investigations

SRK 2020

Completed geotechnical and hydrogeological drill investigation program consisting of nine (9) drill holes.

Detailed geotechnical core logging completed for four (4) drill holes, basic geotechnical logging completed for 5 drill holes.

Laboratory testing conducted.

SRK 2020

Completed geotechnical and hydrogeological drill investigation program consisting of nine (9) drill holes.

Hydraulic conductivity tests, piezometer installations, and extended duration injection tests were completed in five (5) drill holes.

SRK 2017

Completed staged geotechnical field investigation programs in 2015 and 2016. Five HQ3 drill holes were completed for combined geotechnical and hydrogeological data acquisition purposes.

Thirteen drill holes were surveyed using acoustic televiewer.

Laboratory testing was conducted.

SRK 2017

Completed staged geotechnical field investigation programs in 2015 and 2016. Five HQ3 drill holes were completed for combined geotechnical and hydrogeological data acquisition purposes.

Conducted downhole hydraulic conductivity tests and installed standpipe and vibrating wire piezometers.

Tetra Tech 2013

No geotechnical field investigations were completed.

Review of historical geotechnical studies suggests work completed to a high standard.

Tetra Tech 2013

No hydrogeological field investigations were completed.

BGC 2012

Underground focus.

Completed five HQ3 drill holes with lab testing, core logging and lithology descriptions (see Section 3.2).

Completed structural geology mapping.

Completed laboratory strength testing.

BGC 2012

Installed seven (7) vibe wires in five holes (see Section 3.2 for drill hole locations).

Completed hydraulic conductivity testing for various geotechnical units.

Installed one thermistor.

Hydraulic head measurements at selected drill holes.

  
Arctic ProjectPage 58
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

  Rock Geotechnical Hydrogeological
 

URSA 1998

Mapping of major geological structures, faults, and joints.

Completed structural lab strength testing and collected geotechnical data from resource drill holes

 

URSA 1998

No hydrogeological work completed

Technical Findings

SRK 2020

Updated the geotechnical characterization and structural geology model.

Sloped designs were updated based on updated geotechnical assessments. 3-D numerical stability models were utilized to review the influence of talc in the northeast wall.

 

SRK 2020

Hydrogeological assessments were completed for both the open pit and valley bottom water/waste management areas.

Pit inflow and pore pressure conditions were assessed using numerical and analytical tools.

SRK 2017

Established six geotechnical domains based on the rock mass characteristics and structural orientations. Kinematic and 2-D numerical stability analyses were conducted to provide the recommended slope configurations.

The slope design for the east walls that are sub-parallel to the foliation consisted of 60 m high slopes that are stripped along the dip of the foliation fabric. The recommended IRA in the east walls were 26°-30°.

Slope design of other areas of the proposed open pit were controlled by kinematic failure mechanisms.

SRK 2017

Two alternative conceptual hydrogeological models were established – a multiple water system model (regional shallow perched water table in northeast, deeper water table over the pit footprint), and compartmentalized water system model (water levels compartmentalized by faults, talc, and/or permafrost).

A conservative pore pressure conditions were estimated for slope stability analysis.

Tetra Tech 2013

Considers 7 lithogeochemical units; modeled as 3-D volumes (as supplied by Trilogy)

PEA pit with OSA = 43°, triple benched with 5 m benches, 8 m catch berms (single domain/design sector)

 

Tetra Tech 2013

Assumes groundwater levels will follow topography.

No continuous permafrost in area.

  
Arctic ProjectPage 59
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

  Rock Geotechnical Hydrogeological
 

BGC 2012

Two-dimensional geotechnical model using six (6) units combining lithological units of similar rock mass properties (RMR and other criteria defined for each unit).

No 3-D structural model, plan view map only with two regional thrust faults (West Fault at 50° dipping south-southeast and WSFC at 40° dipping to the south).

Mapped strong foliation sets dipping shallowly to the west and moderately to the southwest.

BGC 2012

Conceptual model of ground water flow.

High flow rates in fault zones should be expected, groundwater flow follows topography.

Not enough information to comment on recharge rate due to uncertainty in permafrost.

Permeability data for main geotechnical units ranging from 3 x 10-9 to 6 x 10-7 m/s.

URSA 1998

Developed six (6) geotechnical units based on drill holes and mapping, classified rocks as weak to moderately strong, talc mica schist is worst unit with RMR = 31.

Mapped E-W trending faults with gouge of muscovite and talc and south dipping thrust fault.

Two sets of joint/foliation present that intersect at 25°.

URSA 1998

No hydrogeological analyses completed.

Suggests permafrost not present based on down hole observations

 

5.3.7.2Acid-Base Accounting Studies

 

The 1998 Robertson study first documented ABA results, based on the selection of 60 representative core samples from the deposit. Since then, SRK has advanced the understanding of acid rock drainage potential with studies in 2010, 2013, and 2015-2017 based on an accumulated dataset from over 1550 ABA drill core samples from waste rock and ore, indicating that about 75% of samples were classified as potentially acid generating. Tailings from metallurgical testing in 2017 and 2019 were analysed for ABA and also shown to be potentially acid generating. Kinetic testing studies have subsequently been conducted on waste rock, ore and tailings, to inform rates of acid generation and metal leaching, and are documented in Section 13.11.2.

 

5.3.8Metallurgical Studies

 

Kennecott undertook an extensive series of studies regarding the metallurgy and processing of the Arctic mineralization (refer to summary in Section 10.2 of this Report).

 

5.3.9Development Studies

 

A number of mining and technical studies have been completed over the Arctic Project history, as summarized in Table 5-3.

  
Arctic ProjectPage 60
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Table 5-3: Mining and Technical Services

 

Company Year Consultant Study
Kennecott 1974 internal Ambler District Evaluation
1976 internal Arctic Deposit Order of Magnitude Evaluation
1978 internal

Arctic Prospect Summary File Report

Arctic Deposit

1981 internal Evaluation of the Arctic and Ruby Creek Deposits
1984 internal Evaluation Update
1985 internal Pre-AFD Report
1990 internal Re-Evaluation
1997 internal Arctic Project Mining Potential
1999 internal Interim Report Conceptual Level Economic Evaluations of the Arctic Resource
1998 SRK Preliminary Arctic Scoping Study
NovaGold 2011 SRK Preliminary Economic Assessment
Trilogy (previously, NovaCopper) 2012 SRK Preliminary Economic Assessment
2013 Tetra Tech Preliminary Economic Assessment
2018 Ausenco Pre-Feasibility Report
Trilogy 2020 Ausenco Feasibility Report
Ambler Metals 2021 Ausenco Tailings Evaluation

  
Arctic ProjectPage 61
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

6GEOLOGICAL SETTING, MINERALIZATION, AND Deposit

 

6.1Deposit Types

 

6.1.1Deposit Model

 

The mineralization at the Arctic deposit and at several other known occurrences within the Ambler Sequence stratigraphy of the Ambler Mining District consists of Devonian age, polymetallic (zinc-copper-lead-silver-gold) VMS-like occurrences.

 

Observations and interpretations at the Arctic deposit such as: 1) the tectonic setting with Devonian volcanism in an evolving continental rift; 2) the geologic setting with bimodal volcanic rocks including pillow basalts and felsic volcanic tuffs; 3) an alteration assemblage with well-defined magnesium-rich footwall alteration and sodium-rich hanging wall alteration; and 4) typical polymetallic base-metal mineralization with massive and semi-massive sulphides, are indicative of a Volcanogenic Massive Sulphide (VMS) deposit that has undergone high strain and complex folding and faulting.

 

A variety of VMS types have been well documented in the literature (Franklin et al., 2005), with the Ambler Schist belt deposits most like deposits associated with bimodal felsic dominant volcanism related to incipient rifting. However, the abundance of volcaniclastic rocks with argillaceous sedimentary rocks and the tabular nature of mineralization are considered by Piercey (2022) to be similar to felsic silicilastic VMS environments.

 

Evidence exists for both exhalation and emplacement on the seafloor and replacement of rocks in the sub-seafloor, either via filling of void space or via dissolution of original rocks and replacement by new minerals (Piercey, 2022). For example, the presence of barite, attributed to the mixing of BaCl2(aq) from hydrothermal fluids with seawater sulphate (SO4(aq)) at the vent-seawater interface supports some of the mineralization at Arctic likely precipitated on the seafloor. In contrast, there is ample textural evidence of subseafloor replacement at Arctic, such as the presence of transitions from massive sulphides into selective replacement of interpreted permeable tuff beds in the hanging wall mudstones.

 

The tonnage, grades, and stratigraphic setting of the Arctic deposit, and its broader tectonostratigraphic setting, are similar to other felsic siliclastic VMS environments globally. The deposit has strong similarities to deposits found the Finlayson Lake VMS district, Yukon, Bathurst district, New Brunswick, and some parts of the Iberian Pyrite Belt, Spain-Portugal (Piercey, 2022).

 

A VMS model is considered applicable for use in exploration targeting in the project area and the interpretation of the geological model supporting the Mineral Resource estimate.

 

6.2Regional Geology – Southern Brooks Range

 

The Ambler Mining District occurs along the southern margin of the Brooks Range within an east-west trending zone of Devonian to Jurassic age submarine volcanic and sedimentary rocks (Hitzman et al., 1986). The district covers both: 1) VMS-like deposits and prospects hosted in the Devonian age Ambler Sequence (or Ambler Schist belt or Schist belt), a group of metamorphosed bimodal volcanic rocks with interbedded tuffaceous, graphitic, and calcareous volcaniclastic metasediments; and 2) epigenetic carbonate-hosted copper deposits occurring in Silurian to Devonian age carbonate and phyllitic rocks of the Bornite Carbonate Sequence. The Ambler Sequence occurs in the upper part of the Anirak Schist, the thickest member of the Schist belt or Coldfoot subterrane (Moore et al., 1994). VMS-like stratabound mineralization can be found along the entire 110 km strike length of the district. Immediately south of the Schist belt in the Cosmos Hills, a time equivalent section of the Anirak Schist that includes the approximately 1 km thick Bornite Carbonate Sequence. Mineralization of both the VMS-like deposits of the Schist belt and the carbonate-hosted deposits of the Cosmos Hills has been dated at 375 to 387 Ma (Selby et al., 2009; McClelland et al., 2006).

  
Arctic ProjectPage 62
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

The Ambler Mining District is characterized by increasing metamorphic grade to the north, perpendicular to the strike of the east-west trending units. The district shows isoclinal folding in the northern portion and thrust faulting to south (Schmidt, 1983). The Devonian to Late Jurassic age Angayucham basalt and the Triassic to Jurassic age mafic volcanic rocks are in low angle over thrust contact with various units of the Ambler Schist belt and Bornite Carbonate Sequence along the northern edge of the Ambler Lowlands.

 

6.2.1Terrane Descriptions

 

The terminology used to describe the terranes in the southern Brooks Range evolved during the 1980s because of the region’s complex juxtaposition of rocks of various compositions, ages and metamorphic grade. Hitzman et al. (1986) divided the Ambler Mining District into the Ambler and Angayucham terranes. Further work (Till et al., 1988; Silberling et al., 1992; Moore et al., 1994) includes the rocks of the previously defined Ambler terrane as part of the regionally extensive Schist belt or Coldfoot subterrane along the southern flank of the Arctic Alaska terrane as shown in Figure 6-1 (Moore et al., 1994). In general, the southern Brooks Range is composed of east-west trending structurally bound allochthons of variable metasedimentary and volcanogenic rocks of Paleozoic age.

  
Arctic ProjectPage 63
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Figure 6-1: Regional Geologic Terranes of the Southern Brooks Range

 

 

Source: Trilogy Metals, 2019.

 

The Angayucham terrane, which lies along the southern margin of the Brooks Range, is locally preserved as a klippen within the eastern Cosmos Hills and is composed of weakly metamorphosed to unmetamorphosed massive-to-pillowed basalt rocks with minor radiolarian cherts, marble lenses and isolated ultramafic rocks. This package of Devonian to Late Jurassic age (Plafker et al., 1977) mafic and ultramafic rocks is interpreted to represent portions of an obducted and structurally dismembered ophiolite that formed in an ocean basin south of the present-day Brooks Range (Hitzman et al., 1986; Gottschalk and Oldow, 1988). Locally, the Angayucham terrane overlies the Schist belt to the north along a poorly exposed south-dipping structure.

 

Gottschalk and Oldow (1988) describe the Schist belt as a composite of structurally bound packages composed of dominantly greenschist facies rocks, including pelitic to semi-pelitic quartz-mica schist with associated mafic schists, metagabbro and marbles. Locally, the Schist belt includes the Upper Silurian to middle Devonian age Bornite Carbonate Sequence, the lower Paleozoic age Anirak pelitic, variably siliceous and graphic schists, and the mineralized Devonian age Ambler sequence consisting of volcanogenic and siliciclastic rocks variably associated with marbles, calc-schists, metabasites and mafic schists (Hitzman et al., 1982; Hitzman et al., 1986). The lithologic assemblage of the Schist belt is consistent with an extensional, epicontinental tectonic origin.

  
Arctic ProjectPage 64
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Structurally overlying the Schist belt to the north is the Central belt. The Central belt is in unconformable contact with the Schist belt along a north-dipping low-angle structure (Till et al., 1988). The Central belt consists of lower Paleozoic age metaclastic and carbonate rocks, and Proterozoic age schists (Dillon et al., 1980). Both the Central belt and Schist belt are intruded by meta-to-peraluminous orthogneisses, which locally yield a slightly discordant U-Pb thermal ionization mass spectrometry zircon crystallization age of middle to late Devonian (Dillon et al., 1980; Dillon et al., 1987). This igneous protolith age is supported by Devonian orthogneiss ages obtained along the Dalton Highway, 161 km to the east of the Ambler Mining District (Aleinikoff et al., 1993).

 

Overlying the Schist belt to the south is the Phyllite belt, characterized in the Ambler mining district as phyllitic black carbonaceous schists of the Beaver Creek Phyllite which may underlie much of the Ambler Lowlands between the Brooks Range and the Arctic deposit to the north and the Cosmos Hills and the Bornite deposit to the south. The recessive weathering nature of the Beaver Creek Phyllite limits the exposure, but the unit is assumed to occur as a thrust sheet overlying the main Schist belt rocks.

 

6.2.2Regional Tectonic Setting

 

Rocks exposed along the southern Brooks Range consist of structurally bound imbricate allochthons that have experienced an intense and complex history of deformation and metamorphism. Shortening in the fold and thrust belt has been estimated by some workers to exceed 500 km (Oldow et al., 1987) based on balanced cross sections across the central Brooks Range. In general, the metamorphic grade and tectonism in the Brooks Range increases to the south and is greatest in the Schist belt. The tectonic character and metamorphic grade decreases south of the Schist belt in the overlying Angayucham terrane.

 

During the late Jurassic to early Cretaceous, the Schist belt experienced penetrative thrust-related deformation accompanied by recrystallization under high-pressure and low-temperature metamorphic conditions (Till et al., 1988). The northward directed compressional tectonics were likely related to crustal thickening caused by obduction of the Angayucham ophiolitic section over a south-facing passive margin. Thermobarometry of schists from the structurally deepest section of the northern Schist belt yield relict metamorphic temperatures of 475°C, ±35°C, and pressures from 7.6 to 9.8 kb (Gottschalk and Oldow, 1988). Metamorphism grades from lower greenschist facies in the southern Cosmos Hills to upper greenschist facies, locally overprinting blueschist mineral assemblages in the Schist belt (Hitzman et al., 1986).

 

Compressional tectonics, which typically place older rocks on younger, does not adequately explain the relationship of young, low-metamorphic-grade over older and higher-grade metamorphic rocks observed in the southern Brooks Range hinterland. Mull (1982) interpreted the Schist belt as a late antiformal uplift of the basement to the fold and thrust belt. More recent models propose that the uplift of the structurally deep Schist belt occurred along duplexed, north-directed, thin-skinned thrust faults, followed by post-compressional south-dipping low angle normal faults along the south flank of the Schist belt, accommodating for an over-steepened imbricate thrust stack (Gottschalk and Oldow, 1988; Moore et al., 1994). Rapid cooling and exhumation of the Schist belt began at the end of the early Cretaceous age at 105 to 103 Ma, based on Ar40/Ar39 cooling ages of hornblende and white mica from near Mount Igikpak, and lasted only a few million years (Vogl et al., 2003). Additional post-extension compressive events during the Paleocene age further complicate the southern Brooks Range (Mull, 1985).

 

6.3Local Geology

 

Rocks that form the Ambler Sequence consist of a lithologically diverse sequence of lower Devonian age carbonate and siliciclastic strata with interlayered mafic lava flows and sills. The clastic strata, derived from terrigenous continental and volcanic sources, were deposited primarily by mass-gravity flow into the sub-wavebase environment of an extending marginal basin.

  
Arctic ProjectPage 65
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

The Ambler Sequence underwent two periods of intense, penetrative deformation. Sustained upper greenschist-facies metamorphism with coincident formation of a penetrative schistosity and isoclinal transposition of bedding marks the first deformation period. Pervasive similar-style folds on all scales deform the transposed bedding and schistosity, defining the subsequent event. At least two later non-penetrative compressional events deform these earlier fabrics. Observations of the structural and metamorphic history of the Ambler Mining District are consistent with current tectonic evolution models for the Schist belt, based on the work of others elsewhere in the southern Brooks Range (Gottschalk and Oldow, 1988; Till et al., 1988; Vogl et al., 2002).

 

Figure 6-2 shows the location and geology of the Ambler mining district and the Schist belt terrane including the Anirak Schist, the Kogoluktuk Schist and the Ambler Sequence, the contemporaneous Bornite Carbonate Sequence in the Cosmos Hills to the south, and the allochthonous overthrust Cretaceous sedimentary rocks and Devonian Angayucham Terrane volcanic rocks.

 

Figure 6-2: Local Geology of the Ambler Mining District

 

 

Source: Ambler Metals, 2022.

  
Arctic ProjectPage 66
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

6.3.1General Stratigraphy of the Ambler Sequence

 

Though the Ambler Sequence is exposed over 110 km of strike length, the following descriptions and comments refer to an area between the Kogoluktuk River on the east and the Shungnak River on the west where Trilogy has focused the majority of its exploration efforts over the last decade.

 

The local base of the Ambler Sequence consists of variably metamorphosed carbonates historically referred to as the Gnurgle Gneiss. Trilogy’s joint venture, Ambler Metals interprets these strata as calc-turbidites, perhaps deposited in a sub-wavebase environment adjacent to a carbonate bank. Calcareous schists overlie the Gnurgle Gneiss and host sporadically distributed mafic sills and pillowed lavas. These fine-grained clastic strata indicate a progressively quieter depositional environment up section, and the presence of pillowed lavas indicates a rifting, basinal environment.

 

Overlying these basal carbonates and pillowed basalts is a section of predominantly fine-grained carbonaceous siliciclastic rocks that host most of the mineralization in the district including the Arctic deposit. This quiescent section indicates further isolation from a terrigenous source terrain.

 

Above the stratigraphy hosting the Arctic deposit is a section with voluminous reworked silicic volcanic strata. At the base of this section is the Button Schist, a regionally continuous and distinctive K-feldspar porphyroblastic unit that serves as an excellent marker above the main mineralized stratigraphy. Figure 6-3 shows idealized sections for several different areas in and around the Arctic deposit.

 

Several rock units show substantial changes in thickness and distribution in the vicinity of the Arctic deposit that may have resulted from the basin architecture existing at the time of deposition. Between the Arctic Ridge, geographically above the Arctic deposit, and the Riley Ridge to the west, several significant differences have been documented including:

 

•The Gnurgle Gneiss is thickest in exposures along the northern extension of Arctic Ridge and appears to thin to the west.

 

•Mafic lavas and sills thicken from east to west. They occur as thick units in upper Subarctic Creek and to the west but are sparsely distributed to the east.

 

•The quartzite section within and above the Arctic sulphide horizon does not occur in abundance east of Arctic Ridge; it is thicker and occurs voluminously to the west.

 

•Button Schist thickens dramatically to the west from exposures on Arctic Ridge; exposures to the east are virtually non-existent.

 

•Greywacke sands do not exist east of Subarctic Creek but occur in abundance as massive, channelled accumulations to the west, centred on Riley Ridge.

 

These data are interpreted by Trilogy’s joint venture, Ambler Metals to define a generally north-northwest-trending depocentre through the central Ambler Mining District. Volcanic debris flow occurrences as well as these formational changes suggest that the depocentre had a fault-controlled eastern margin. The basin deepened to the west; the Riley Ridge section was deposited along a high-energy axis, and the COU section lies to the west-southwest distally from a depositional energy point of view. This original basin architecture appears to have controlled mineralization of the sulphide systems at Arctic and Shungnak (Dead Creek), concentrating fluid flow along structures on the eastern basin margin.

  
Arctic ProjectPage 67
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Figure 6-3: Ambler Sequence Stratigraphy in the Arctic Deposit Area

 

 

Source: Trilogy Metals, 2019.

 

Figure 6-4 is a simplified geologic map of the area between the Kogoluktuk and the Shungnak Rivers.

  
Arctic ProjectPage 68
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Figure 6-4: Generalized Geology of the Central Ambler Mining

 

 

Source: Trilogy Metals, 2022.

 

6.3.2Structural Framework of the Ambler Mining District

 

In addition to the underlying pre-deformational structural framework of the district suggested by the stratigraphic thickening of various facies around the Arctic deposit, the Ambler Sequence is deformed by two penetrative deformational events that significantly complicate the distribution and spatial arrangement of the local stratigraphy.

 

6.3.2.1F1 Deformation

 

The earliest penetrative deformation event is associated with greenschist metamorphism and the development of regional schistosity. True isoclinal folds are developed, and fold noses typically are thickened. The most notable F1 fold is the Arctic antiform that defines the upper and lower limbs of the Arctic deposit. The fold closes along a north-northeast-trending fold axis roughly mimicking the trace of Subarctic Creek and opening to the east. Importantly, the overturned lower limb implies that the permissive stratigraphy should be repeated on a lower synformal isocline beneath the currently explored limbs and would connect with the permissive mineralized stratigraphy to the northwest at Shungnak (Dead Creek). Figure 6-5 shows typical F1 folds developed in calcareous Gnurgle Gneiss.

  
Arctic ProjectPage 69
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Figure 6-5: Typical F1 Isoclinal Folds Developed in Calcareous Gnurgle Gneiss

 

 

Source: Trilogy Metals, 2019.

 

6.3.2.2F2 Deformation

 

The earlier F1 schistosity is in turn deformed by an F2 deformational event that resulted in the local development of an axial planar cleavage. The deformational event is well defined throughout the Schist belt and results in a series of south-verging, open to moderately overturned folds that define a series of east-west trending folds of similar vergence across the entire Schist belt stratigraphy.

  
Arctic ProjectPage 70
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

This event is likely temporally related to the emplacement of the Devonian Angayucham volcanics sequences, the obducted Jurassic ophiolites and Cretaceous sediments within the Schist belt stratigraphy.

 

In addition to the earlier penetrative deformation events, a series of poorly defined non-penetrative deformation events, likely due to Cretaceous extension, are seen as a series of warps or arches across the district.

 

The interplay between the complex local stratigraphy, the isoclinal F1 event, the overturned south verging F2 event and the series of post-penetrative deformational events often makes district geological interpretation extremely difficult at a local scale.

 

6.4Arctic Property Geology

 

Previous workers at the Arctic deposit (Russell 1995 and Schmidt 1983) describe three mineralized horizons: the Main Sulphide Horizon, the Upper South Horizon and the Warm Springs Horizon. The Main Sulphide Horizon was further subdivided into three zones: the southeast zone, the central zone, and the northwest zone. Previous deposit modelling was grade-based resulting in numerous individual mineralized zones representing relatively thin sulphide horizons.

 

Recent work by Ambler Metals defines the Arctic deposit as two or more discrete horizons of sulphide mineralization contained in a complexly deformed isoclinal fold with an upright upper limb and an overturned lower limb hosting the main mineralization. Nearby drilling suggests that a third upright lower limb, likely occurs beneath the currently explored stratigraphy. Figure 6-6 is a generalized geologic map of the immediate Arctic deposit area.

  
Arctic ProjectPage 71
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Figure 6-6: Generalized Geologic Map of the Arctic Deposit

 

 

Source: Trilogy Metals, 2019.

 

6.4.1Lithologies and Lithologic Domain Descriptions

 

Historically, five lithologic groupings were used by Kennecott (URSA Engineering, 1998 and Russell, 1995) to describe the local stratigraphy of the deposit. These groupings of rock types and protoliths include: 1) metarhyolite (Button Schist) or porphyroblastic quartz feldspar porphyry and rhyolitic volcaniclastic and tuffaceous rocks; 2) quartz mica schists composed of tuffaceous and volcaniclastic sediments; 3) graphitic schists composed of carbonaceous sedimentary rocks; 4) base metal sulphide bearing schists; and 5) talc schists composed of talc altered volcanic and sedimentary rocks. Trilogy’s joint venture, Ambler Metals has subsequently re-interpreted and modified the lithological groupings. In 2022, Piercey provided further interpretation of the stratigraphy, lithofacies, alteration and mineralization at Arctic based on a study of core from six holes drilled in 2022 and a field visit to Arctic.

  
Arctic ProjectPage 72
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

The principal lithologic units captured in logging and mapping by Trilogy’s joint venture, Ambler Metals are summarized and described in the following subsections, in broadly chronologically order from oldest to youngest. A summary of the interpretation of geology in cross section is shown in Figure 7-14, Figure 7-15, Figure 7-17 and Figure 7-18. These cross sections illustrate significant mineralized zones encountered on the Property including, a summary of the surrounding rock types, relevant geological controls, and the length, width, depth and continuity of the mineralization.

 

6.4.1.1Greenstone (GNST)

 

Greenstones consists of massive dark-green amphibole and garnet-bearing rocks, differentiated by their low quartz content and dark green colour. Intervals of greenstone range up to 80 m in thickness and are identified as pillowed flows, sills, and dikes. Multiple ages of deposition are implied by the presence of both basal pillowed units as well as intrusive sill and dike-like bodies higher in the local stratigraphy. Textural and colour similarities along with similar garnet components and textures often cause confusion with some metasedimentary greywackes within the Ambler Sequence stratigraphy.

 

6.4.1.2Chlorite Schist (ChS)

 

This unit is likely alteration-related but has been used for rocks where more than half of the sheet silicates are composed of chlorite. In the field, some samples of chlorite schist show a distinctive dark green to blue-green colour, but in drill core the chlorite schists commonly have a lighter green colour. Some intervals of chlorite schist are associated with talc-rich units. The footwall to the Arctic deposit is dominated by this lithofacies which Piercey (2022) describes as variably chlorite (and talc) altered tuffs and lapilli tuffs. Immediately beneath mineralization the rocks are tuffaceous and are strongly and pervasively chlorite and talc (- sericite) altered and, with depth, there are alternating layers of finer chlorite-talc bearing tuffs and quartz and feldspar and/or felsic fragment lapilli tuffs.

 

6.4.1.3Talc Schist (TS)

 

Talc-bearing schists are often in contact with chlorite-rich units and reflect units which contain trace to as much as 30% talc, often occurring on partings. Like the chlorite schist this unit is likely alteration related.

 

6.4.1.4Black to Grey Schist (GS)

 

Black or grey schists appear in many stratigraphic locations particularly higher in the stratigraphy but principally constitute the mineralized permissive stratigraphy of the Arctic deposit lying immediately below the Button Schist (MRP). The schist is typically composed of muscovite, quartz, feldspar, graphite, pyrite and/or pyrrhotite, and sometimes chlorite and/or biotite, interpreted to be an argillite with minor laminae of felsic ash and mm-sized crystals of feldspar and quartz (Piercey, 2022) The texture is phyllitic, variably crenulated, and suggests a pelitic protolith, likely deposited in a basin that was progressively filled with terrigenous fine sediment. This unit is host to the MS and SMS horizons that constitute the Arctic deposit.

 

Piercey (2022) recognized a distinct laminated argillite/mudstone that is more siliceous and 30 cm to several metres in thickness above massive sulphides. This argillite is interlayered with mm to cm scale tuffaceous beds that contain quartz and rhyolite ash and is variably pyritic with flecks and spots of pyrite.

  
Arctic ProjectPage 73
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

6.4.1.5Button Schist (MRP)

 

This rock type consists of quartz-muscovite-feldspar schists with abundant distinctive 1 to 3 cm K-feldspar porphyroblasts of metamorphic origin and occasional 0.5 to 2 cm blue quartz phenocrysts of likely igneous origin. The unit shows a commonly massive to weakly foliated texture, although locally the rocks have a well-developed foliation with elongate feldspars. Piercey (2022) observed the crystals are hosted within a grey to black argillaceous to tuffaceous matrix and interprets the Button Schist to be a crystal-rich lapilli tuff to tuff.

 

6.4.1.6Quartz-Mica-(Feldspar) Schist (QMS/QFMS)

 

This schistose rock contains variable proportions of quartz, muscovite, and sometimes feldspar. The schist usually contains high amounts of interstitial silica, and sometimes have feldspar or quartz porphyroblasts. The texture of the unit shows significant variability and likely represents both altered and texturally distinct felsic tuffs and other volcaniclastic lithologies.

 

Piercey (2022) distinguishes four distinct units within the hanging wall quartz-mica (feldspar) schist: rhyolitic tuff with argillite laminae and wisps; rhyolitic tuffs to lapilli tuffs; clotted feldspar lapilli tuff, and a lapilli tuff with lenticular cm-sized fragments variably replaced by pyrite and sphalerite that is referred to as the lenticular unit. This unit sits directly atop mineralization or stratigraphically above the distinct laminated argillite/mudstone described above.

 

6.4.1.7Debris Flow (DM)

 

This unit contains a range of unsorted, matrix supported polylithic clasts including clasts of the Button Schist, occurring in black to dark grey, very fine-grained graphitic schist. The unit occurs as lenses within other stratigraphic units, and likely represents locally derived debris flows or slumps.

 

6.4.1.8Greywacke (GW)

 

This unit consists of massive green rocks with quartz, chlorite, probably amphibole, feldspar, muscovite, and accessory garnet, biotite, and calcite/carbonate. Voluminous accumulations of medium-grained greywacke occur within, but generally above, the quartz mica schist and are differentiated from texturally similar greenstones by the presence of detrital quartz, fine-grained interbeds, graded bedding and flute casts.

 

6.4.1.9Lithogeochemistry of Immobile Trace Elements

 

In 2007, work by NovaGold suggested that many of the nondescript felsic metavolcanic lithologies were simply alteration and textural variants of the felsic rock units and logging was not adequately capturing true compositional lithological differences between units. Twelker (2008) demonstrated that the use of immobile trace elements, specifically Al2O3:TiO2 (aluminum oxide: titanium dioxide) ratios, could be used to effectively differentiate between different felsic volcanic and sedimentary suites of rocks at the Arctic deposit.

 

Lithogeochemistry shows three major felsic rock suites in the Arctic deposit area: a rhyolite suite; and intermediate volcanic suite and a volcaniclastic suite. These suites are partially in agreement with the logged lithology but in some instances the lithogeochemistry showed that alteration in texture and composition masked actual lithologic differences.

 

Results of the lithogeochemistry have led to a better understanding of the stratigraphic continuity of the various units and have been utilized to model the lithologic domains of the Arctic deposit more accurately.

  
Arctic ProjectPage 74
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

6.4.1.10Lithologic Domains

 

Though a variety of detailed lithologies are logged during data capture, Ambler Metals models the deposit area as two distinct structural plates, an Upper Plate and a Lower Plate separated by the Warm Springs Fault. The Upper and Lower Plates contain similar lithologic domains that are primarily defined by lithogeochemical characteristics but are also consistent with their respective acid-generating capacities and spatial distribution around the fold axes. The domains include the following units: the Button Schist (a meta-rhyolite porphyry - MRP), aphanitic meta-rhyolite (AMR), a series of felsic quartz mica schists (QMS), and carbonaceous schists of the Grey Schist unit (GS). An alteration model was built to adequately characterize the chlorite and talc schists found within the deposit (ChS, ChTS, and TS). The mineralization is modelled as eight distinct zones (Zones 1–8) found both in the Upper and Lower Plates and range from MS to SMS.

 

6.4.2Structure

 

Earlier studies (Russell, 1977, 1995; Schmidt, 1983) concluded mineralization at the Arctic deposit was part of a normal stratigraphic sequence striking northeast and dipping gently southwest. Subsequent reinterpretation by Kennecott in 1998 and 1999 suggested the entire Ambler Sequence could be overturned. Proffett (1999) reviewed the Arctic deposit geology and suggested that a folded model with mineralization as part of an isoclinal anticline opening east and closing west could account for the mapped and logged geology. His interpretation called for an F2 fold superimposed on a north-trending F1 fabric.

 

Lindberg (2004) supported a similar folded model though he considered that the main fold at Arctic to be northwest-closing and southeast-opening. Lindberg named this feature the Arctic antiform and interpreted it to be an F1 fold.

 

Lindberg believed most folding within the deposit occurred in the central part, within a southwest plunging “Cascade zone.” The increased thicknesses of mineralized intervals in this part of the property can in part be explained by the multiple folding of two main mineralized horizons as opposed to numerous individual mineralized beds as shown in the 1995 geologic model. The Cascade zone appears to be confined to the upper sulphide limbs of the Arctic antiform.

 

in 2008, closer spaced drilling across the Cascade zone confirmed the continuity of the two mineralized horizons but did not support the complexity proposed by Lindberg. Dodd et al. (2004) suggested that some of the complexity might be related to minor thrusting. Results of mapping in 2006 supported the interpretation of an F2 fold event that may fold the lower Button Schist back to the north under the deposit in this area (Otto, 2006). To test this concept, deep drilling on the north side of the deposit in 2007 encountered the appropriate upright stratigraphy at depth. Though the target horizon was not reached due to the drill rig limitations, the hole did encounter significant mineralization below the Button Schist immediately above the sulphide-bearing permissive stratigraphy.

 

6.4.3Arctic Deposit Alteration

 

Schmidt (1988) defined three main zones of hydrothermal alteration occurring at the Arctic deposit:

 

•A main chloritic zone occurring within the footwall of the deposit consisting of phengite and magnesium-chlorite.

 

•A mixed alteration zone occurring below and lateral to sulphide mineralization consisting of phengite and phlogopite together with talc, calcite, dolomite, and quartz.

 

•A pyritic zone overlying the sulphide mineralization.

  
Arctic ProjectPage 75
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Field observations conducted by NovaGold in 2004 and 2005 supported by logging and short-wave infrared (SWIR) spectrometry only partially support Schmidt’s observations.

 

Talc and magnesium chlorite are the dominant alteration products associated with the sulphide-bearing horizons. Talc alteration grades downward and outward to mixed talc-magnesium chlorite with minor phlogopite, into zones of dominantly magnesium chlorite, then into mixed magnesium chlorite-phengite with outer phengite-albite alteration zones. Thickness of alteration zones vary with stratigraphic interpretation, but tens of metres for the outer zones is likely, as seen in phengite-albite exposures on the east side of Arctic Ridge. Stratigraphically above the sulphide-bearing horizons significant muscovite as paragonite is developed and results in a marked shift in sodium/magnesium ratios across the sulphide bearing horizons.

 

Piercey (2022) describes footwall alteration dominated by an assemblage of chlorite and talc with lesser sericite, quartz and carbonate with intense, pervasive talc-chlorite alteration extending between 10-50 m into the immediate footwall. Chlorite-talc alteration extends at least +200m into the footwall, decreasing in intensity with depth.

 

Hanging wall alteration extends approximately 50-100 metres into the hanging wall with intense talc-sericite alteration and sulphide replacement in the lenticular unit, decreasing in intensity upwards, to be patchier to semi-pervasive talc-sericite alteration in the upper parts of the stratigraphy (Piercey, 2022).Visual and quantitative determination of many of the alteration products is difficult at best due to their light colours and the well-developed micaceous habit of many of the alteration species. Logging in general has poorly captured the alteration products and the SWIR methodology though far more effective in capturing the presence or absence of various alteration minerals adds little in any quantitative assessment.

 

Of particular note are the barium species including barite, cymrite (a high-pressure barium phyllosilicate), and barium-bearing muscovite, phlogopite and biotite. These mineral species are associated with both alteration and mineralization and demonstrate local remobilization during metamorphism (Schmandt, 2009). Though little has been done to document their distribution to date, they do have a significant impact on bulk density measurements (refer to discussions in Section 10 and Section 11).

 

Talc is of particular importance at the Arctic deposit due to its potential negative impact on flotation characteristics during metallurgical processing, and on pit slope stability. The majority of the talc zones occur between the upper, stratigraphically up-right mineralized zones and the lower, overturned mineralized zones. Piercey (2022) noted that the strong talc alteration prevalent at Arctic is rather unique in this type of setting and may be due to the Mg-rich nature of the calc-silicates and carbonate-bearing rocks in the Anirak Schist underlying the felsic-dominated package.

 

6.4.4Arctic Deposit Mineralization

 

Mineralization occurs as stratiform SMS to MS beds within primarily graphitic schists and fine-grained quartz mica schists. The sulphide beds average 4 m in thickness but vary from less than 1 m up to as much as 18 m in thickness. The sulphide mineralization occurs within eight modelled zones lying along the upper and lower limbs of the Arctic isoclinal anticline. The zones are all within an area of roughly 1 km2 with mineralization extending to a depth of approximately 250 m below the surface. There are five zones of MS and SMS that occur at specific pseudo-stratigraphic levels which make up the bulk of the Mineral Resource estimate. The other three zones also occur at specific pseudo-stratigraphic levels but are too discontinuous.

 

Unlike more typical VMS deposits, mineralization is not characterized by steep metal zonation or massive pyritic zones. Mineralization dominantly consists of sheet-like zones of base metal sulphides with variable pyrite and only minor zonation, usually on a small scale.

  
Arctic ProjectPage 76
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Mineralization is predominately coarse-grained sulphides comprising chalcopyrite, sphalerite, galena, tetrahedrite-tennantite, pyrite, arsenopyrite, and pyrrhotite. Sulphides occur as disseminated (<30%), semi-massive (30 to 50% sulphide) to massive (greater than 50% sulphide) layers. Trace amounts of electrum are also present. Gangue minerals associated with the mineralized horizons include quartz, barite, white mica, chlorite, stilpnomelane, talc, calcite, dolomite and cymrite.

 

6.5Prospects

 

In addition to the Arctic deposit, numerous other VMS-like occurrences are present in the UKMP land package. The most notable of these occurrences are the Dead Creek (also known as Shungnak), Sunshine, Cliff, Horse, and the Snow prospects to the west of the Arctic deposit and the Red, Nora, Tom-Tom and BT prospects to the east. Four kilometres northwest of Arctic is target 98-9 where chalcopyrite and sphalerite associated with pyrrhotite and quartz carbonate veins are found in chlorite-biotite schists. Figure 6-7 shows the UKMP land package and the prospect locations. Figure 6-7 also shows: 1) the Smucker deposit on the far west end of the Ambler Sequence which is currently owned by Teck Alaska Inc.; 2) the Sun deposit at the eastern end of the Ambler Sequence and owned by Valhalla Metals Inc, and 3) carbonate-hosted deposits and prospects in the Bornite Carbonate Sequence controlled by Ambler Metals/NANA.

  
Arctic ProjectPage 77
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Figure 6-7: Major Prospects of the Ambler Mining District

 

 

Source: Ambler Metals, 2022.

  
Arctic ProjectPage 78
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

7EXPLORATION

 

7.1Exploration

 

Table 7-1 summarizes the exploration work conducted by NovaGold, Trilogy (formerly, NovaCopper), and Ambler Metals from 2004 to the present. Field exploration was largely conducted during the period between 2004 to 2007 with associated engineering and characterization studies between 2008 and the present.

 

Table 7-1:Summary of NovaGold/Trilogy/Ambler Metals Exploration Activities Targeting VMS-style Mineralization in the Ambler Sequence Stratigraphy and the Arctic Deposit

 

Work Completed Year Details Focus
Geological Mapping
- 2004 - Arctic deposit surface geology
- 2005 - Ambler Sequence west of the Arctic deposit
- 2006 - COU, Dead Creek, Sunshine, Red
- 2015, 2016 SRK Geotechnical Structural Mapping
- 2016 - Arctic deposit surface geology
- 2021 - Snow, Ambler, Nani, DH, Cliff, Sunshine, Dead Creek, BT, 98-9/Pipe, COU, SE Arctic, Nora
- 2022 - Snow, Ambler, Nani, DH, Bud, Sunshine, Dead Creek, BT, 98-9/Pipe, COU, East Arctic, Nora, South Cliff, SK, Cynbad, Z, Tom Tom, Kogo/White Creek
Geophysical Surveys
SWIR Spectrometry 2004 2004 drill holes Alteration characterization
TDEM 2005 2 loops Follow-up of Kennecott DIGHEM EM survey
2006 13 loops District targets
2007 6 loops Arctic extensions
Downhole EM 2007 4 drill holes Arctic deposit
VTEM Plus (Versatile Time Domain Electromagnetic) airborne helicopter geophysical 2019 400m line spacing with 200m infill with tie lines 4000m spacing Ambler Mining District and Cosmos Hills with infill over Arctic, Sunshine and Horse-Cliff

  
Arctic ProjectPage 79
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Work Completed Year Details Focus
ZTEM (Z-Axis Tipper Electromagnetic) airborne helicopter geophysical 2019 400m line spacing with tie lines 4000m spacing Ambler Mining District and Cosmos Hills with infill over Arctic, Sunshine and Horse-Cliff
Geochemistry
- 2005 - Stream silts – core area prospects
- 2006 - Soils – core area prospects
- - Stream silts – core area prospects
- 2007 - Soils – Arctic deposit area
- 2021 - Soils - VTEM 26-29, JA Creek, West Dead Creek, Dead Creek
- 2022 - Soils - Sub Arctic Valley, South Cliff, VTEM 26-29, VTEM-41, VTEM-23 , East and West Sunshine, Tom Tom, Kogo/White Creek, SK, Cynbad, East Arctic,  West Dead Creek, Dead Creek, 98-9/Pipe, Z, Nora, Ambler, Nani
-   Streams silts - Core area prospects
Survey
Collar 2004 to 2011, 2018, 2019, 2021, 2022 DGPS All 2004 to 2019 NovaCopper drill holes
2004, 2008 Resurveys Historical Kennecott drill holes
Photography/Topography 2010 - Photography/topography
LiDAR Survey 2015, 2016 - LiDAR over Arctic deposit
Technical Studies
Geotechnical 2010 BGC Preliminary geotechnical and hazards
ML/ARD 2011 SRK Preliminary ML and ARD
Metallurgy 2012 SGS Preliminary mineralogy and metallurgy
Geotechnical and Hydrology 2012 BGC Preliminary rock mechanics and hydrology
Geotechnical and Hydrology 2015, 2016, 2018, 2019, 2021, 2022 SRK Arctic PFS and FS slope design

  
Arctic ProjectPage 80
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Work Completed Year Details Focus
ML/ARD 2015, 2016, 2017, 2018, 2019 SRK Static kinetic tests and ABA update - ongoing
Metallurgy 2015, 2016, 2017, 2018, 2019, 2021 SGS, ALS Cu-Pb Separation Testwork; Flotation and Variability Testwork; SAG Mill Comminution (SMC) Testwork, filtration Testwork, thickener Testwork, and tailings settling testing
Arctic Project Evaluation
Resource Estimation 2008 SRK Resource estimation
PEA 2011 SRK PEA - Underground
  2012 Tetra Tech PEA – Open Pit
PFS 2018 Ausenco Pre-Feasibility Study
FS 2020 Ausenco Feasibility Study

 

Note:SWIR = short wave infrared; LiDAR = light detection and ranging; ML = metal leaching; BGC = BGC Engineering Inc.; SGS = SGS Canada; ALS = ALS Metallurgy; PEA = preliminary economic assessment.

 

7.1.1Grids and Surveys

 

Survey and data capture during the Kennecott’s programs used the UTM coordinates system Zone 4, NAD27 datum. In 2010, NovaGold converted all historical geology and topographic data for the Arctic deposit into the NAD83 datum for consistency. At that time NovaGold contracted WH Pacific, Inc. (WHPacific) to re-establish project-wide survey control and benchmarks for the Arctic deposit. Current Mineral Resource estimate and geologic models use topography completed in 2010 by PhotoSat Inc. The resolution of the satellite imagery used was at 0.5 m and a 1 m contour map and digital elevation model were generated.

 

Trilogy retained WHPacific (and sub-consultant Quantum Spatial, Inc.) to conduct an aerial LiDAR survey over the Upper Kobuk area during 2015. Due to scheduling difficulties and poor weather conditions only 70% of the survey was completed in 2015. The remaining 30% of the aerial survey, as well as the final post-processing work, was completed between June and October 2016.

 

7.1.2Geological Mapping

 

NovaGold focused its exploration mapping efforts on an area covering approximately 18 km of strike length of the permissive Ambler Sequence rocks of the Schist belt stratigraphy. This area is centred on the Arctic deposit and covers the thickest portion of the Ambler Sequence rocks. The area covers many of the most notable mineralized occurrences including the Red prospect east of the Kogoluktuk River, the Arctic deposit, and the nearby occurrences at the West Dead Creek and Dead Creek prospects, and the CS, Bud and Sunshine prospects west of the Shungnak River.

 

In 2004, mapping focused on the surface geology in and around the Arctic deposit while exploration in 2005 extended the Ambler Sequence stratigraphy to the west. In 2006 with expansion of the exploration focus to encompass the immediate district and to support a major TDEM geophysical program, mapping was extended to include the area between the Sunshine prospect on the west and the Red prospect on the east. Figure 7-1 shows areas mapped by successive campaigns, which resulted in the generalized geological interpretation shown in Figure 6-4.

  
Arctic ProjectPage 81
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Figure 7-1:Mapping Campaigns in and around the Arctic Deposit

 

 

Source: Trilogy Metals, 2019.

 

SRK was contracted in 2015 to create a structural geology model primarily based on brittle structures of the Arctic deposit for pit design and mine scheduling. The majority of the structural mapping took place along the north-south trending Arctic Ridge, and along the northwest trending ridge above a cirque to the south of the deposit, both of which provided the greatest exposure.

 

Geologic and structural mapping were completed by Trilogy geologists during the 2016 field season. The objectives of the mapping project were threefold; 1) to ground-truth the northeast and north-south trending fault structures identified by SRK in 2015 and to otherwise support SRK’s 2016 geotechnical mapping efforts, 2) field check the outcrops mapped in 2006 and 2008 recorded in the current GIS database, and 3) determine the nature of the Warm Springs Fault by mapping in the immediate hanging wall of this apparent structural feature. The first objective was successfully accomplished and the pending SRK geotechnical structural model was considered to be robust. The two other objectives were partly met during the short field season.

  
Arctic ProjectPage 82
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Geological mapping was completed by Ambler Metals geologists during the 2021 and 2022 field seasons. The mapping and geochemical sampling occurred at numerous prospects throughout the Ambler Belt, including the Snow, Ambler, Nora, Sunshine, Centre of the Universe, Pipe, DH, Cliff, 98-9 and BT prospects. The purpose of geologic mapping and sampling was to increase mapped extents at known prospects, collect mineralized and non-mineralized surface samples for various analyses and evaluate VTEM anomalies identified from the 2019 survey.

 

7.1.3Geochemistry

 

Soil and silt geochemical sampling were used to target many of the VMS prospects in the Ambler Sequence particularly in the core area around the Arctic deposit. Between 2005 and 2007, NovaGold collected 2,272 soils and 278 silt samples. Much of the reconnaissance soil sampling used gridding layouts of 200 m lines and 50 m sample intervals oriented perpendicular to stratigraphy. Results of the sampling were used to refine areas for geophysical surveying, and to define drill targets.

 

Ambler Metals completed soil sampling on numerous prospect areas within the Ambler VMS Belt during the 2021 and 2022 field seasons. In 2021, 731 soil samples were collected at Dead Creek, West Dead Creek, JA Creek, and over four VTEM (anomalies 26-29). Collection points spacing varied by prospect but were generally at 30 m spacing along parallel lines 100-200 m apart oriented to cross-cut stratigraphy. The 2021 program used the same analysis methods as the NovaGold programs.

 

In 2021, soil and silt samples were submitted directly to either ALS Minerals in Fairbanks (a division of ALS Global, formerly ALS Chemex) or Alaska Assay Labs in Fairbanks for sample preparation. The samples were dried and sieved to 80 mesh and forwarded to ALS Minerals for analysis. The samples were analysed using the ME-ICP61 method and a four acid near total digestion with 27 elements measured.

 

7.1.4Geophysics

 

During NovaGold’s tenure, the geophysical surveys were largely focused on ground and downhole EM methods to follow-up on the 1998 DIGHEM airborne EM survey conducted by Kennecott.

 

From 2005 to 2007, NovaGold conducted TDEM surveys and completed 21 different loops targeting the Arctic deposit, extensions to the Arctic deposit and a series of DIGHEM airborne anomalies in and around known prospects and permissive stratigraphy. Table 7-2 summarizes the TDEM loops and locations.

 

Frontier Geosciences of Vancouver, BC completed all of the geophysical programs using a Geonics PROTEM 37 transmitter, a TEM-57 receiver and either a single channel surface coil or a three component BH43-3D downhole probe.

  
Arctic ProjectPage 83
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Table 7-2:TDEM Loops and Locations

 

Area   2005   2006   2007
Arctic   1   -   6
COU   1   3   -
Dead Creek   -   4   -
Sunshine   -   2   -
Red   -   1   -
Tom   -   1   -
Kogo/Pipe   -   2   -
Total   2   13   6

 

In addition to the TDEM surveys, Frontier Geosciences surveyed four drill holes (AR05-89, AR07-110, AR07-111, and AR07-112). All of the drill holes produced off-hole anomalies, notably AR07-111, which showed evidence of a strong EM conductor north of the hole. Follow-up of this conductor is warranted.

 

In 2019, Trilogy contracted GeoTech Ltd. of Aurora, Ontario to complete VTEM Plus (Versatile Time Domain Electromagnetic) and ZTEM (Z-Axis Tipper Electromagnetic) airborne helicopter geophysical surveys over the Cosmos Hills and the Ambler VMS belt. These survey methods are a significant upgrade over the previous DIGHEM survey flown by Kennecott in 1998 over the VMS belt and the DIGHEM survey flown by NovaGold over the Bornite Sequence in 2006 due to the greater resolution and deeper penetration ability. The magnetic field was also measured using a cesium vapor sensor, though radiometric data were not collected due to snow cover.

 

The program was designed, managed, and results interpreted by Resource Potential, a geophysical consulting company based in Perth, Australia.

 

The VTEM survey was flown at a 400 m line spacing over the Ambler VMS Belt along lines oriented at 20°-200° for the western portion of the belt and along north-south lines for the eastern portion (see Figure 7-2). In-fill lines at 200 m spacing were flown over the Arctic, Sunshine, and Horse-Cliff areas to provide greater resolution in those high priority areas. Tie lines at ~4 km spacing were flown perpendicular to the EM flight lines to provide control for the magnetic survey.

  
Arctic ProjectPage 84
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Figure 7-2:VTEM Flight Lines Over the Ambler Belt and Cosmos Hill Prospective Areas

 

 

Source: Ambler Metals, 2019.

 

The ZTEM survey was flown along lines with the same orientation as the VTEM survey at 400m line spacing, with tie lines at every 4 km. (Figure 7-3). Resource Potential re-processed the data from GeoTech and provided a 3D EM block model and both plan view depth slices and sectional EM images for the ZTEM survey. Numerous anomalies identified from both the VTEM and ZTEM surveys need further evaluation.

  
Arctic ProjectPage 85
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Figure 7-3:ZTEM Flight Lines Over the Ambler VMS Belt and the Bornite Deposit

 

 

Source: Trilogy Metals, 2019

 

7.1.5Petrology, Minerology and Research Studies

 

Trilogy supported a series of academic studies of the Arctic deposit. In 2009, Danielle Schmandt completed an undergraduate thesis entitled “Mineralogy and Origin of Zn-rich Horizons within the Arctic Volcanogenic Massive Sulphide deposit, Ambler District, Alaska” for Smith College. The Schmandt thesis focused on a structural and depositional reconstruction of the Arctic deposit with the goal of locating the hydrothermal vents to aid in exploration.

 

Bonnie Broman, a Trilogy geologist, completed a Master of Science thesis in 2014 at the University of Alaska Fairbanks, focusing on the nature and distribution of the silver-bearing mineral species within the Arctic deposit. The thesis is titled “Metamorphism and Element Redistribution: Investigations of Ag-bearing and associated minerals in the Arctic Volcanogenic Massive Sulphide deposit, SW Brooks Range, NW Alaska.”

  
Arctic ProjectPage 86
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

7.2Drilling

 

7.2.1Overview

 

Drilling at the Arctic deposit and within the Ambler Mining District has been ongoing since the initial discovery of mineralization in 1966. Approximately 67,639 m of drilling has been completed within the Ambler Mining District, including 55,038 m of drilling in 285 drill holes sat the Arctic deposit or on potential extensions in 32 campaigns spanning 56 years. Drilling outside the Arctic deposit area is discussed in Section 7.2.2.

 

All of the drill campaigns at the Arctic deposit utilize diamond drill holes and have been run under the supervision of either: 1) Kennecott and its subsidiaries (BCMC), 2) Anaconda, or 3) Trilogy (formerly, NovaCopper) and its predecessor company, NovaGold and its successor joint venture Company, Ambler Metals. Table 7-3 summarizes operators, campaigns, holes, and meters drilled on the Arctic deposit. All drill holes listed in Table 7-3 - except 11 geotechnical holes in 2017, 24 geotechnical holes drilled in 2018, 8 holes from the 2021 program and 34 holes from the 2022 program, for which assay results were not available - were used to validate the geologic model.

 

Table 7-3:Companies, Campaigns, Drill Holes and Meters Drilled at the Arctic Deposit

 

Year   Company   No. of Holes   Metres  
1967   BCMC   7   752  
1968   BCMC   18   3,836  
1969   BCMC   3   712  
1970   BCMC   3   831  
1971   BCMC   1   257  
1972   BCMC   1   407  
1973   BCMC   2   557  
1974   BCMC   3   900  
1975   BCMC   26   4,942  
1976   BCMC, Anaconda   10   805  
1977   BCMC, Anaconda   4   645  
1979   BCMC, Anaconda   3   586  
1980   Anaconda   1   183  
1981   BCMC, Anaconda   2   632  
1982   BCMC, Anaconda   5   677  
1983   BCMC   1   153  
1984   BCMC   2   253  
1986   BCMC   1   184  
1998   Kennecott   6   1,523  
2004   NovaGold   11   2,996  
2005   NovaGold   9   3,393  
2007   NovaGold   4   2,606  
2008   NovaGold   14   3,306  
2011   NovaGold   5   1,193  

  
Arctic ProjectPage 87
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Year   Company   No. of Holes   Metres  
2015   NovaCopper   14   3,055  
2016   NovaCopper   13   3,058  
2017   Trilogy Metals   5   790  
2018   Trilogy Metals   24   906  
2019   Trilogy Metals   9   2,433  
2021   Ambler Metals   18   4,131  
2022   Ambler Metals   47   8,376  
Total   -   272   55,078  

 

Trilogy (formerly, NovaCopper) and its predecessor company, NovaGold and its successor joint venture Company, Ambler Metals, drilled 36,243 m in 173 holes targeting the Arctic deposit and several other prospects within the Ambler Schist belt. Table 7-4 summarizes all the NovaGold/Trilogy/Ambler Metals tenure drilling on the Project.

 

Table 7-4:Summary of NovaGold/Trilogy/Ambler Metals Arctic Deposit Drilling

 

Year   Metres   No. of Drillholes   Sequence   Purpose of Drilling
2004   2,996   11   AR04-78 to 88   Deposit scoping and verification
2005   3,393   9   AR05-89 to 97   Extensions to the Arctic deposit
2006*   3,010   12   AR06-98 to 109   Property-wide exploration drilling
2007   2,606   4   AR07-110 to 113   Deep extensions of the Arctic deposit
2008*   3,306   14   AR08-114 to 126   Grade continuity and metallurgy
2011   1,193   5   AR11-127 to 131   Geotechnical studies
2012*   1,752   4   SC12-014 to 017   Exploration drilling – Sunshine
2015   3,055   14   AR15-132 to 145   Geotechnical-hydrogeological studies, resource infill
2016   3,058   13   AR16-146 to 158   Geotechnical-hydrogeological studies, resource infill
2017**   790   5   AR17-159 to 163   Ore sorting studies
2018   906   24   GT18-AR-01 to 19   Geotechnical studies for site facilities
      MS18-AR-01 to 05  
2019*   2433   9   AR19-0164 to 172   Geotechnical and hydrogeological studies for 2020 FS
  1,357   6   SC19-018 to 023   Exploration drilling – Sunshine
2021**   4,131   18   AR21-0173 to 190   Geotechnical and hydrogeological studies for 2021 FS and In-fill
  2,414   6   Various holes   Property-wide exploration drilling
2022***   8,376   47   AR22-0191 to 237   Geotechnical and infill drilling
  1,644   5   Various holes   Property-wide exploration drilling
Total   46,420   206    -   -

 

Notes: 

*Drilling in 2006, 2012, and some holes in 2019 and 2021 targeted exploration targets elsewhere in the VMS belt. 

**Holes drilled in 2018 are not included in the current resource estimate as they were completed geotechnical site facilities studies. 

***8 holes drilled in 2021 and 2022 are not included in the current resource database and were used to validate the resource model, as the results were not available at the time of updating the resource database.

  
Arctic ProjectPage 88
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Geotechnical holes drilled in 2017 and 2018 are not included in the current resource estimate as they were completed for geotechnical site facilities studies. Assays for 8 out of 18 holes drilled at Arctic in 2021 and 34 out of 34 holes drilled in 2022 were not available for use in grade estimation in the current mineral resource estimate because the assays were not available at the time of resource estimation. Figure 7-4 shows the locations of drill holes in the vicinity of the Arctic deposit.

 

Figure 7-4:Plan Map of Drill Holes coloured by Year in the Vicinity of the Arctic Deposit. Dark Grey is Limits of 2021 Conceptual Pit

 

 

Source: Wood, 2022.

 

Significant exploration drilling has been carried out elsewhere within the UKMP targeting numerous occurrences along the Ambler Schist belt. Table 7-5 summarizes the drilling within the UKMP outside of the Arctic deposit.

 

Figure 7-5 shows the locations of known major prospects and drill collar locations for the Ambler Mining District. Note that none of these drill holes are located within the current Arctic Project and are therefore not included in the resource calculation.

  
Arctic ProjectPage 89
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Table 7-5:Drill, Meterage and Average Drill Depth for Ambler Sequence VMS Targets

 

Area   Drill Holes
(number)
  Metres   Average
Depth (m)
 
Dead Creek/West Dead Creek   21   3,470   165  
Sunshine/Bud   42   8,468   201  
Snow/Trilogy   11   1,527   139  
Horse/Cliff/DH   22   2,277   104  
Red/Nora/BT   18   2,399   133  
Total   114   18,141   148  

 

Figure 7-5:Collar Locations and Principal Target Areas – Ambler Mining District

 

 

Source: Ambler Metals, 2022.

  
Arctic ProjectPage 90
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Exploration in 2006 investigated a series of geophysical anomalies in the central portion of the Ambler Schist belt near the Arctic deposit. In 2012, Trilogy drilled an additional four holes totalling 1,752 m to explore the down dip extension of the Sunshine prospect. Twelve holes totalling 3,100 m were drilled. In 2012, Trilogy drilled an additional four holes totalling 1,752 m to explore the down dip extension of the Sunshine prospect. In 2019, Trilogy drilled 10 holes totalling 3,823 m at four regional targets. Regional drilling is summarized in Table 7-6 and Table 7-7 and in Figure 7-6 to Figure 7-11.

 

Table 7-6:Ambler Metals Exploration Drilling – Ambler Schist Belt

 

Hole
ID
  Area   Target   UTM
East
  UTM
North
  Azimuth
(°)
  Dip
(°)
  Depth
(m)
AR06-98   COU   EM Anomaly   609490   7454374   0   -90   712.6
AR06-99   98-3   EM Anomaly   610111   7458248   0   -90   420.0
AR06-100   98-3   EM Anomaly   609989   7458633   0   -90   225.6
AR06-101   Red   EM Anomaly   618083   7451673   0   -90   141.7
AR06-102   Sunshine   West Extension   601176   7457834   30   -65   97.8
AR06-103   Red   EM Anomaly   618073   7451806   0   -90   209.7
AR06-104   Red   EM Anomaly   617926   7451693   0   -90   183.2
AR06-105   Red   EM Anomaly   618074   7451537   0   -90   136.6
AR06-106   Red   EM Anomaly   618083   7451677   310   -60   185.0
AR06-107   Sunshine   West Extension   601018   7458119   30   -60   294.4
AR06-108   Dead Creek   Downdip Extension   607618   7458406   0   -90   289.0
SC12-014   Sunshine   Sunshine Extension   601948   7457759   20   -57   537.8
SC12-015   Sunshine   Sunshine Extension   601860   7457637   20   -65   477.0
SC12-016   Sunshine   Sunshine Extension   601649   7457637   45   -77   386.2
SC12-017   Sunshine   Sunshine Extension   602063   7457701   20   -60   351.1
SC19-018   Sunshine   Sunshine Infill   601748   7457922   15   -52   296.3
SC19-019   Sunshine   Sunshine Infill   601748.2   7457923   0   -90   160.6
SC19-020   Sunshine   Sunshine Infill   601863.2   7457873   70   -48   230.4
SC19-021   Sunshine   Sunshine Infill   601862.2   7457872   70   -48   212.8
SC19-022   Sunshine   Sunshine Infill   601692.2   7457866   345   -80   203.6
SC19-023   Sunshine   Sunshine Infill   601691.6   7457868   345   -45   253.0
NEN22-001   98-9   Surface occurrence   615906   7456176   90   -55   223.72
NEN22-002   98-9   Surface occurrence   615907   7456178   90   -50   376.12
NEN22-003   98-9   Surface occurrence w/EM anomaly   615881   7456028   109   -45   451.1
NEN22-004   98-9   Surface occurrence w/EM anomaly   615880   7456029   140   -45   348.09
SNO21-001   Snow   Extension of Snow w/coincident EM Anomaly   584650   7462550   340   -80   529.74
SNO21-002   Snow   Extension of Snow w/coincident EM Anomaly   584650   7462551   11   -45   413
XAR21-001   NE Arctic   Extension of Arctic   613803   7453218   135   -45   448.67
XAR21-002   NE Arctic   Extension of Arctic   613805   7453217   135   -80   291.39
XAR21-003   SE Arctic   EM Anomaly   614750   7451885   340   -55   401.42
XAR21-004   SE Arctic   EM Anomaly   614894   7451990   32   -57   339.85
AR06-109   Dead Creek   Stratigraphy Hole   608187.7   7458314.5   0   -90   114.91

  
Arctic ProjectPage 91
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Table 7-7:2019-2021 Regional Prospect Drilling Significant Intercepts

 

Sunshine Drill Results
1.5% CuEq Cut-off
    Hole   From (m)   To (m)   Length_m   CuEq%   Cu_%   Zn_%   Pb_%   Au_g/t   Ag_g/t   Ba_pct  
Sunshine  SC19-018   139.52   144.76   5.24   3.93   2.08   3.13   0.63   0.154   41.643   -  
  SC19-018   238.72   245.06   6.34   2.38   1.63   1.45   0.09   0.070   13.380   -  
  SC19-018   247.86   255.06   7.20   1.69   0.72   2.18   0.21   0.030   6.640   -  
  SC19-018   260.46   261.60   1.14   1.71   1.53   0.35   0.01   0.027   3.670   -  
  SC19-019   57.00   66.14   9.14   3.95   3.02   1.42   0.27   0.137   24.651   -  
  SC19-019   68.85   72.15   3.30   2.82   1.68   1.77   0.47   0.121   27.573   -  
  SC19-019   98.81   102.54   3.73   5.51   4.74   0.97   0.13   0.153   28.957   -  
  SC19-019   122.36   125.40   3.04   1.63   0.75   1.40   0.35   0.077   21.020   -  
  SC19-019   138.17   146.05   7.88   5.23   2.23   5.62   1.10   0.180   46.947   -  
  SC19-020   176.37   179.74   3.37   6.54   4.15   3.42   0.48   0.258   74.354   -  
  SC19-020   188.55   190.10   1.55   3.77   1.43   1.65   0.40   0.061   23.300   -  
  SC19-020   204.15   209.09   4.94   5.77   4.47   3.42   0.01   0.002   0.117   -  
  SC19-020   219.30   221.98   2.68   3.87   3.70   0.44   0.00   0.002   0.396   -  
  SC19-021   146.62   156.28   9.66   6.10   3.93   3.00   0.77   0.216   73.104   -  
  SC19-022   114.12   115.47   1.35   5.90   2.89   4.87   1.41   0.172   68.300   -  
  SC19-022   130.40   134.61   4.21   1.85   0.34   2.28   1.07   0.066   30.634   -  
  SC19-022   143.73   159.01   15.28   3.08   1.35   2.91   0.78   0.158   32.584   -  
  SC19-023   163.50   168.51   5.01   2.09   0.87   1.92   0.66   0.101   24.687   -  
Northeast Arctic 2021   XAR21-001   421.00   422.52   1.52   0.20   0.07   0.04   0.26   0.014   1.000   -  
  XAR21-001   436.12   436.57   0.45   2.08   0.11   0.02   0.05   0.003   216.000   -  
  XAR21-002   235.65   236.11   0.46   2.14   0.55   1.04   2.77   0.025   23.800   -  
  XAR21-002   239.02   240.10   1.08   0.25   0.09   0.01   0.39   0.009   0.710   -  
  XAR21-003   358.75   359.34   0.59   0.48   0.29   0.10   0.35   0.003   3.710   -  
Snow   SNO21-001   137.87   138.21   0.34   5.85   0.35   5.47   7.04   0.321   99.600   0.16  
  SNO21-001   138.21   140.04   1.83   0.81   0.04   0.96   0.83   0.088   10.500   0.21  
  SNO21-001   137.87   140.04   2.17   1.60   0.09   1.67   1.80   0.125   24.460   0.20  
  SNO21-001   329.59   330.70   1.11   0.92   0.61   0.15   0.51   0.035   6.260   0.16  
  SNO21-002   167.16   167.48   0.32   7.49   0.23   7.25   9.13   0.391   139.000   0.08  
  SNO21-002   167.48   168.26   0.78   1.07   0.09   0.89   1.22   0.147   16.350   0.34  
  SNO21-002   168.26   168.62   0.36   1.22   0.02   1.35   1.66   0.072   10.200   0.29  
  SNO21-002   168.62   169.16   0.54   1.49   0.08   1.55   2.06   0.075   10.000   0.29  

 

*Cu-Eq calculation uses the Trilogy’s 2020 Arctic FS metal prices of $3.00 Cu, $1.10 Zn, $1.00 Pb, $18.00 Ag and $1,300 Au.

  
Arctic ProjectPage 92
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Figure 7-6:Sunshine Prospect and Drill Hole Locations

 

 

Source: Trilogy Metals, 2020.

  
Arctic ProjectPage 93
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Figure 7-7:Snow Project and Drill Hole Locations

 

 

Source: Ambler Metals, 2021.

  
Arctic ProjectPage 94
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Figure 7-8:Northeast and Southeast Arctic and Drill Hole Locations

 

 

Source: Ambler Metals, 2021.

  
Arctic ProjectPage 95
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Figure 7-9:98-9(NEN) Prospect and Drill Hole Locations

 

 

Source: Ambler Metals, 2021.

  
Arctic ProjectPage 96
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Figure 7-10:East Dead Creek Prospect and Drill Hole Locations

 

 

Source: Ambler Metals, 2021.

  
Arctic ProjectPage 97
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Figure 7-11:Plan Map of Drill Holes in the Vicinity of the Arctic Deposit

 

 

Source: Trilogy Metals, 2022.

 

7.2.2Drill Companies

 

Over the Arctic Project’s history, a relatively limited number of drill companies have been used by both Kennecott, NovaGold, Trilogy/NovaCopper and Ambler Metals at the Arctic deposit. During Kennecott’s work programs, Sprague and Henwood, a Pennsylvania-based drilling company was the principal contractor. Tonto Drilling provided services to Kennecott during Kennecott’s short return to the district in the late 1990s. NovaCopper and NovaGold used Boart Longyear as their only drill contractor. Trilogy has used Major Drilling and Tuug Drilling. Ambler Metals used Tuuq Drilling in 2021. Table 7-8 summarizes drill companies and core sizes used.

  
Arctic ProjectPage 98
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Table 7-8:Drill Contractors, Drill Holes, Meterage and Core Sizes by Drill Campaign at the Arctic Deposit

 

Year   Company   No. of
Drill Holes
  Metres   Core Size   Drill Contractor
1967   Bear Creek   7   752   BX   Sprague and Henwood
1968   Bear Creek   18   3,782   BX   Sprague and Henwood
1969   Bear Creek   3   712   BX   Sprague and Henwood
1970   Bear Creek   3   831   BX   Sprague and Henwood
1971   Bear Creek   2   257   BX   Sprague and Henwood
1972   Bear Creek   1   407   BX   Sprague and Henwood
1973   Bear Creek   2   557   BX   Sprague and Henwood
1974   Bear Creek   3   900   NX and BX   Sprague and Henwood
1975   Bear Creek   26   4,942   NX and BX   Sprague and Henwood
1976   Bear Creek   8   479   NXWL and BXWL   Sprague and Henwood
1977   Bear Creek   3   497   NXWL and BXWL   Sprague and Henwood
1979   Bear Creek   2   371   NXWL and BXWL   Sprague and Henwood
1981   Bear Creek   1   458   NXWL and BXWL   Sprague and Henwood
1982   Bear Creek   4   494   NXWL and BXWL   Sprague and Henwood
1983   Bear Creek   1   153   NXWL and BXWL   Sprague and Henwood
1984   Bear Creek   2   253   NXWL and BXWL   Sprague and Henwood
1986   Bear Creek   1   184   NXWL and BXWL   Sprague and Henwood
1998   Kennecott   6   1,523   HQ   Tonto
2004   NovaGold   11   2,996   NQ and HQ   Boart Longyear
2005   NovaGold   9   3,393   NQ and HQ   Boart Longyear
2007   NovaGold   4   2,606   NQ and HQ   Boart Longyear
2008   NovaGold   14   3,306   NQ and HQ   Boart Longyear
2011   NovaGold   5   1,193   NQ3 and HQ3   Boart Longyear
2015   NovaCopper   14   3,055   NQ and HQ   Boart Longyear
2016   NovaCopper   13   3,058   NQ and HQ   Boart Longyear
2017   Trilogy Metals   5   790   PQ   Major Drilling/Tuuq Drilling
2018   Trilogy Metals   24   906   PQ   Tuuq Drilling
2019   Trilogy Metals   9   2,433   PQ and HQ3   Tuuq Drilling
2021   Ambler Metals   18   4,131   PQ and HQ3   Tuuq Drilling
2022   Ambler Metals   47   8,376   HQ3   Major Drilling

  
Arctic ProjectPage 99
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Sprague and Henwood used company-manufactured drill rigs during their work programs on the Project. Many of their rigs remain at the Bornite deposit and constitute a historical inventory of 1950s and 1960s exploration artifacts. The 2004 to 2011 NovaGold drill programs used a single skid-mounted LF-70 core rig, drilling HQ (63.5 mm core diameter) or NQ (47.6 mm) core. The drill was transported by skid to the various drill pads using a D-8 bulldozer located on site. The D-8 was also used in road and site preparation. Fuel, supplies, and personnel were transported by helicopter. The 2015 and 2016 NovaCopper drill programs used two helicopter-portable LF-70 core rigs, drilling HQ or NQ core. The drill was transported by helicopter to various drill pads. The 2017 Trilogy metallurgical drill program used a helicopter-portable LF-90 core rig, drilling PQ (85 mm) core to be used in future metallurgical testwork. The drill was transported by helicopter to various drill pads. In 2018, Trilogy used a helicopter-portable Duralite 1400N, drilling PQ core to be used for geotechnical studies in plant site facilities. Drilling during 2019 consisted of two helicopter-portable Duralite 1400N core rigs, drilling PQ and HQ core used for geotechnical and hydrogeological studies to support Trilogy’s 2020 FS. The 2021 Ambler Metals program was completed by Tuuq Drilling utilizing three helicopter-portable Duralite 1400N rigs for geotechnical, hydrogeological, resource conversion drilling, and to collect mineralized material for metallurgical testwork. The 2022 Ambler Metals program was completed by Major Drilling utilizing 3 helicopter-portable (2 Discovery EF-75 and 1 Longyear LF-90) rigs for geotechnical, hydrogeological, resource conversion drilling, and to collect mineralized material for metallurgical testwork.

 

7.2.3Drill Core Procedures

 

7.2.3.1BCMC/Kennecott

 

There is only partial knowledge of specific drill core handling procedures used by Kennecott during their drill programs at the Arctic deposit. The drill data collected during the Kennecott drilling programs (1965 to 1998) were logged on paper drill logs, copies of which are stored in the Kennecott office in Salt Lake City, Utah. Electronic scanned copies of the paper logs, in PDF format, are held by Trilogy. Drill core was hydraulically split or cut with half core submitted to various assay laboratories and the remainder stored in Kennecott’s core storage facility at the Bornite Camp. Between 1965 and 1986 analyses were conducted primarily by Union Assay Office Inc. of Salt Lake City, Utah. At least six other labs were also used during that time period, but mostly as check labs or for special analytical work. ALS Minerals was used for analyses submitted by Kennecott in 1998.

 

7.2.3.2NovaGold/Trilogy (formerly, NovaCopper)/Ambler Metals

 

Throughout Trilogy’s work programs, the following standardized core handling procedures have been implemented. Core is slung by helicopter to either the Dahl Creek (2004 to 2008) or Bornite (2011 to 2019) Camp core-logging facilities. Upon receiving a basket of core, geologists and geotechnicians first mark the location of each drilling block on the core box, and then convert footages on the blocks into metres. All further data capture is then based on metric measurements. Geotechnicians or geologists measure the intervals (or “from/to”) for each box of core using the drilling blocks and written measurements on the boxes.

 

Geotechnicians fill out metal tags with the hole ID, box number and “from/to”, and staple them to each core box. Geotechnicians then measure the core to calculate percent recovery and rock quality designation (RQD).

  
Arctic ProjectPage 100
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Geologists then mark sample intervals to capture each lithology or other geologically appropriate intervals. Geologists staple sample tags on the core boxes at the start of each sample interval and mark the core itself with a wax pencil to designate sample intervals. Sample intervals used are well within the width of the average mineralized zones in the resource area. This sampling approach is considered appropriate for the style of mineralization and alteration.

 

Core is logged with lithology and visual alteration features captured on observed interval breaks. Geological and geotechnical parameters are recorded based on defined sample intervals and/or drill run intervals (defined by the placement of a wooden block at the end of a core run). Logged parameters are reviewed annually and slight modifications have been made between campaigns, but generally include rock type, mineral abundance, major structures, SG, point load testing, recovery and rock quality designation measurements, and magnetic susceptibility. Mineralization data, including total sulphide (recorded as percent), sulphide type (recorded as an absolute amount), gangue and vein mineralogy are collected for each sample interval with an average interval of approximately 2 m. Structural data are collected as point data. Geotechnical data (core recovery, RQD) are collected over drill run intervals.

 

Drill hole data are recorded in a digital format and, after a QA/QC review, are forwarded to the Database Manager who then imports them into the master database.

 

After logging, the core is digitally photographed and cut in half using diamond core saws. Specific attention to core orientation is maintained during core sawing to ensure the most representative sampling. Not all core is oriented; however, core that has been oriented is identified to samplers by a line drawn down the core stick. If core was not competent, it was split by using a spoon to transfer half of the core into the sample bag.

 

One-half of the core is returned to the core box for storage on site and the other half is bagged and labelled for sample processing and analysis. Select specific gravity measurements are also taken (refer to 8.1.3).

 

7.2.4Geotechnical and Hydrogeological Drilling

 

Geotechnical and hydrogeological drilling is summarized in Table 7-9 and Table 7-10. The collar locations of the geotechnical drilling and hydrogeological drilling are presented Figure 7-12 and Figure 7-13. The number of holes reported for each year are the holes that were staffed by a geotechnician and/or hydrogeologist at the rig and primary purpose was to gather geotechnical and hydrogeological data. Geotechnical data (besides PLT’s) and hydrogeological installs may have been completed on holes from other programs, such as in-fill or metallurgical holes. Triple tube core barrels were used for geotechnical drill holes in 2015, 2016, and 2019. The geotechnical and hydrogeological field and laboratory testing approach and the results are discussed in Section 13.9 and Section 17.1.5.

 

Table 7-9:Summary of Geotechnical Drilling

 

    2011   2015   2016   2017   2018   2019   2021   2022
Number of Holes   5   2   3   11   24   4   8   5
Oriented core   X   X   X           X   X   X
Water level monitoring   X   X   X   X   X   X   X   X
Falling head packer tests   X                            
Point load tests   X   X   X           X   X   X
Uniaxial compressive strength       X   X           X        
Direct shear testing       X   X           X   X   X
Modulus testing       X   X           X        
Triaxial testing       X   X           X   X   X
Acoustic Televiewer           X                    
Falling Head, Single or Straddle packer tests   X       X                    
Airlift pump test           X                    
Hydraulic conductivity testing (slug testing)               X                
Cohesive and residual shear strength tests on soils               X   X            
Compressive strength test on core and rock               X   X            
Extended duration injection tests                       X        

  
Arctic ProjectPage 101
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Table 7-10:Summary of Geotechnical Drilling by Year and Purposes

 

Year Purpose
2011 Obtain geotechnical data in areas of the deposit that may host underground infrastructure or could pose issues with underground mining.
2015 Collect geotechnical and hydrogeological data to better understand the wall rock characteristics and hydrogeology within the open pit area.
2016 Complete the 3 drill holes that were deferred/not completed from the 2015 program.
2017 Collect geotechnical and hydrogeological data for tailings management and waste rock facilities within the entire Sub Arctic Creek valley.
2018 Collect geotechnical and hydrogeological data for WRF, TMF, and surface infrastructure in the Upper Sub Arctic Creek Valley.
2019 Provide additional geotechnical and hydrogeological data for pit design for the 2020 FS
2021 Define talc horizons on east side of pit for pit design.
2022 Define extent of lower talc horizons on northeast side of pit for pit design.

  
Arctic ProjectPage 102
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Figure 7-12:Locations of Geotechnical Drilling

 

 

 

Source: SRK, 2022

  
Arctic ProjectPage 103
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Figure 7-13:Locations of Hydrogeological Drilling

 

 

Source: SRK, 2022

 

7.2.5Collar Surveys

 

7.2.5.1Kennecott

 

Kennecott provided NovaGold with collar coordinates for all historical holes in UTM coordinates using the NAD27 datum. NovaGold re-surveyed collars of selected historical holes in 2004 and again in 2008. The re-surveys showed little variation compared to the historical surveys.

 

7.2.5.2NovaGold/Trilogy (formerly, NovaCopper)/Ambler Metals

 

Collar location coordinates were determined for the 2004 to 2016 NovaGold/Trilogy drill campaigns with two Ashtech ProMark 2 GPS units using the Riley Vertical Angle Benchmark (VABM; 611120.442E, 7453467.486N) as the base station for all surveys. Raw GPS data were processed with Ashtech Solutions 2.60 software. All surveyed data were collected in the NAD27 datum and later converted to NAD83.

 

A 2010 survey by a Registered Land Surveyor from WHPa observed differences between the 2010 and historical coordinates used for the Riley VABM, which were of the same magnitude (0.5 m east, 0.1 m north and 1.0 m down) as other Arctic drill collars that were re-surveyed for the third time. A correction was applied to all Arctic drill holes based upon the newly established coordinates for the Riley VABM, together with converting from NAD27 to NAD83 datums. All post 2010 surveys are completed in NAD83.

  
Arctic ProjectPage 104
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

During Tetra Tech’s 2013 site visit, nine drill collars were located using a Garmin™ Etrex 20 GPS unit. The difference between reported and measured positions ranged between 3.4 and 7.8 m with an average discrepancy of 4.8 m. These differences are within the tolerances expected for GPS verification.

 

A Registered Land Surveyor, Eric Cousino of Windy Creek Surveys, completed collar coordinate survey locations of the 2019 drilling in August 2019. The Horizontal Datum used on this project for point position determinations was NAD_83(CORS96) (EPOCH 2003), and the Vertical Datum is NAVD88 computed using Geiod09. Data were output into NAD83 Zone 4N (meters) using JAVAD Justin post-processing software.

 

The 2021 collars were surveyed by Layne Lewis, the Ambler Metals drill coordinator, using a Leica GS18 differential GPS system (cm-scale accuracy). Kuna Engineering surveyed the 2022 collar locations using a Trimble R12 GPS/GNSS receiver.

 

7.2.6Downhole Surveys

 

BCMC did not perform downhole surveys prior to 1971 (drill hole AR-32). In 1971, BCMC began to survey selected (mineralized) drill holes using a Sperry-Sun downhole survey camera usually at 30.5 m (100 ft) intervals. BCMC was able to re-enter and survey a few of the older drill holes. BCMC, and later Kennecott, applied a single azimuth (49°) and uniform dip deviation every 15.24 m (50 ft) that flattens with depth to all holes collared vertically that were not surveyed.

 

Downhole surveys from 2004 to 2017 were collected using either a Reflex EZ-shot camera or a Ranger single-shot tool with individual survey readings collected at the drill rig on approximately 30 to 60 m intervals. During the 2019 drill program, downhole surveys were collected using a continuous north seeking gyroscope with readings collected at the drill rig on roughly 30m intervals. Downhole surveys in 2021 were taken every 100 feet (30.5 meters) with a Reflex EZ-Trac multi-shot instrument. The magnetic declination correction from 2004 to 2021 were calculated using the NOAA Magnetic Field Calculator website and the longitude and latitude of the Arctic deposit.

 

The downhole survey data show a pronounced deviation of the drill holes toward an orientation more normal to the foliation.

 

7.2.7Recovery

 

7.2.7.1Kennecott

 

Incomplete Kennecott data exist with regards to overall core recovery but based on 917 intervals of 3.05 m or less in the historical database, the average recovery was 92%. Kennecott RQD measurements in the 1998 program averaged 87.0%. There has been no systematic evaluation of recovery by rock type.

 

7.2.7.2NovaGold/Trilogy (formerly, NovaCopper)/Ambler Metals

 

Core recovery during NovaGold/NovaCopper/Trilogy and Ambler Metals drill programs were good to excellent, resulting in quality samples with little to no bias. There are no other known drilling and/or recovery factors that could materially impact accuracy of the samples during this period.

  
Arctic ProjectPage 105
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Table 7-11 shows recoveries and RQD for each of the NovaGold/NovaCopper/Trilogy and Ambler Metals campaigns exclusive of the geotechnical drill holes in 2011 and 2021.

 

Table 7-11:Recovery and RQD 2004 to 2008 Arctic Drill Campaigns

 

Year   Metres   Recovery (%)   RQD (%)  
2004   2,996   98.0   73.4  
2005   3,030   96.0   74.4  
2007   2,606   95.7   73.1  
2008   3,306   98.0   80.1  
2011   1,193   96.0   68.8  
2015   3,055   91.3   69.0  
2016   3,058   91.5   69.7  
2017   790   95.5   75.0  
2019   2,433   96.3   77.1  
2021   2,282   95.1   70.3  

 

7.2.8Drill Intercepts

 

All drill holes at the Arctic deposit are collared on surface and are generally vertically oriented, or steeply inclined in a northeast direction. The majority of drill holes are spaced at 75 m to 100 m intervals, but there are instances where drill holes are located within 10 m of one another. Drill holes typically intersect the generally shallow-dipping mineralized horizon at approximately right angles.

 

Drilling at the Arctic deposit covers an area measuring roughly 1,000 m east-west by 1,000 m north south with holes that approach 750 m below surface. Significant results of the distribution of copper in drilling is shown in plan and in vertical cross-sectional views in Figure 7-14 to Figure 7-16. Significant results of the distribution of zinc in drilling is shown in plan and in vertical cross-sectional views in Figure 7-17 to Figure 7-19. These results represent a summary of the QPs interpretation of the exploration information.

  
Arctic ProjectPage 106
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Figure 7-14:Drill Plan of Arctic Copper Results

 

 

Source: Wood, 2022

  
Arctic ProjectPage 107
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Figure 7-15:Cross-Section 1 of Arctic Copper Results Looking South

 

 

Source: Wood, 2022

 

Figure 7-16:Cross-Section 2 of Arctic Copper Results Looking South

 

 

Source: Wood, 2022

  
Arctic ProjectPage 108
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Figure 7-17:Drill Plan of Arctic Zinc Results

 

 

Source: Wood, 2022

  
Arctic ProjectPage 109
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Figure 7-18:Cross-Section 1 of Arctic Zinc Results Looking South

 

 

Source: Wood, 2022

 

Figure 7-19:Cross-Section 2 of Arctic Zinc Results Looking South

 

 

Source: Wood, 2022 

  
Arctic ProjectPage 110
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

8SAMPLE PREPARATION, ANANLYSES AND SECURITY

 

8.1Sample Preparation

 

8.1.1Core

 

The data for the Arctic deposit were generated over three primary drilling campaigns: 1966 to 1986 when BCMC, a subsidiary of Kennecott was the primary operator, 1998 when Kennecott resumed work after a long hiatus, and 2004 to present under NovaGold. Trilogy (formerly, NovaCopper), and Ambler Metals.

 

8.1.1.1Kennecott and BCMC

 

Sampling of drill core prior to 1998 focused primarily on the mineralized zones; numerous intervals of weak to moderate mineralization were not sampled during this period. During the 1998 campaign, Kennecott did sample some broad zones of alteration and weak mineralization, but much of the unaltered and unmineralized drill core was left unsampled. Little documentation on historic sampling procedures is available.

 

8.1.1.2NovaGold/Trilogy (formerly, NovaCopper)

 

Between 2004 and 2005, NovaGold conducted a systematic drill core re-logging and re-sampling campaign of Kennecott and BCMC era drill holes AR-09 to AR-74. NovaGold either took 1 to 2 m samples every 10 m or sampled entire lengths of previously unsampled core within a minimum of 1 m and a maximum or 3 m intervals. The objectives of the sampling were to generate a full (ICP) geochemistry dataset for the Arctic deposit and ensure continuous sampling throughout the deposit.

 

From 2004 to 2019, sample intervals are determined by the geological relationships observed in the core and limited to a 2.5 m maximum length and 1 m minimum length. Sample intervals terminate at lithological and mineralization boundaries. Sampling is generally continuous from the top to the bottom of the drill hole unless otherwise directed by the Exploration Manager. Occasionally, if warranted by the need for better resolution of geology or mineralization, smaller sample intervals may be employed. When the hole is in unmineralized rock, the sample length is generally 2.5 m, whereas in mineralized units, the sample lengths are shortened to 1 to 2 m.

 

After logging, the core was cut in half using diamond core saws. If core was not competent, it was split by using a spoon to transfer half of the core into the sample bag. One-half of the core was returned to the core box for storage on site and the other half was bagged, labelled, and sent to ALS Minerals Laboratories in Vancouver for analysis, via the (ALS preparation facility in Fairbanks Alaska) and the other half was archived in the core storage facility at the Bornite Camp facilities or at the Ambler Metals warehouse in Fairbanks. For the 2021 metallurgical holes, ¼ core was sampled for analysis at ALS, ¼ retained, and ½ sent for metallurgical testing.

 

Standard and Blank control samples were inserted at site into the shipments at the approximate rate of one standard reference material (standard), one blank per 17 core samples. At the Exploration Manager direction, ALS also prepared one coarse duplicate per 17 core samples. A sample tag for these duplicates was inserted into an empty sample bag at site.

  
Arctic ProjectPage 111
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

8.1.2Acid-Base Accounting Sampling

 

In 2010, SRK collected 148 samples from drill core based on their position relative to the massive and semi-massive sulphide mineralization (SRK 2011). Samples were targeted within, immediately adjacent to, adjacent to, and between lenses of mineralization; the sampling program focused on characterization for a potential underground development scenario. Samples were shipped to SGS Canada Inc., Burnaby, BC, for sample preparation and analysis. Samples were analysed for acid base accounting (ABA) and metals. ABA tests were conducted using the Sobek method with sulphur speciation and total inorganic carbon (TIC) analysis. Metal concentrations were determined using aqua regia digestion followed by ICP-MS analysis. In addition, barium and fluorine were analysed by X-ray fluorescence (XRF) following a lithium metaborate fusion.

 

In 2015, Trilogy retained SRK to provide metal leaching (ML) and ARD characterization services for the Arctic deposit. Activities focused on three objectives: 1) construction of on-site barrel tests and parallel humidity cells, 2) expansion of the ABA database to support future evaluation for ARD potential management for open pit mining, and 3) evaluation of the use of proxies for ABA parameters in the exploration database with the purpose of being able to use the exploration database for block modelling of ML/ARD potential, if needed. Barrel test samples were collected during July and August 2015 and eight on-site barrel tests (including two QC tests) were constructed and initiated in late August 2015. Following the set-up of the on-site barrel tests, representative composite rock samples were shipped to Maxxam Analytics of Burnaby, British Columbia and parallel humidity cells were initiated in late October 2015. Trilogy and SRK selected 321 samples to be analysed for a conventional static ABA package with a trace element scan using the same method as the exploration database (four-acid digestion). Samples were analysed by Global ARD Testing Services of Burnaby, British Columbia.

 

In 2016, Trilogy evaluated the distribution of the existing samples to select additional samples in preparation for block modelling of ML/ARD potential. A drill program was designed, and infill samples were collected from holes drilled in 2015 and 2016. This program was completed with 1004 samples analysed for a conventional static ABA package with a trace element scan using the same method as the exploration database. Samples were analysed by Global ARD Testing Services of Burnaby, British Columbia. The resulting data were combined with the previous datasets.

 

In 2018 and 2021, the kinetic test program was expanded to further characterize ML/ARD potential. Samples were selected using the exploration geochemistry database, to target drill core with geochemical characteristics representing the range of compositions present in the database for key parameters such as sulphur and selenium. Kinetic testing was initiated in 2019 and 2021 at Bureau Veritas (previously Maxxam Analytics) of Burnaby, BC, and the kinetic samples were also analysed by static methods at Bureau Veritas for ABA and metals by the same methods as the 2015 and 2016 programs, in addition to metal concentrations determined using aqua regia digestion followed by ICP-MS analysis.

 

As described above, several laboratories were used for acid base accounting studies and associated kinetic testwork as summarized in Table 8-1. Accreditations, where known, are listed below. All the labs are independent of NovaGold, NovaCopper, Trilogy (formerly, NovaCopper), and Ambler Metals.

  
Arctic ProjectPage 112
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Table 8-1:Analytical Laboratories used for Acid Base Accounting and Kinetic Studies for the Arctic Project

 

Laboratory
Name
Laboratory
Location
Years
Used
Accreditation Comment
SGS Canada Inc. Burnaby, BC 2010 ISO 90001 and ISO/IEC 17025. ABA samples
Global ARD Testing Services Burnaby, BC 2015, 2016 ISO/IEC 17025 ABA samples
ARS Aleut Analytical Anchorage and Fairbanks, AK 2015, 2016, 2017, 2018 Accreditations are not known. Barrel test leachate samples
Bureau Veritas (previously Maxxam Analytics) Burnaby, BC 2015, 2016, 2017, 2018, 2019, 2020, 2021, 2022. ISO/IEC 17025 ABA samples (2015 and 2019), HCTs (2015 to 2022), and barrel test leachate samples (2019-2022)

 

8.1.3Density Determinations

 

Representative (SG) determinations conducted before 1998 for the Arctic deposit are lacking. Little information regarding sample size, sample distribution and SG analytical methodology are recorded for determinations during this period.

 

In 1998, Kennecott collected 38 core samples from that year’s drill core, of which 22 were from mineralized zones and 16 from non-mineralized lithologies. Mineralized samples were defined as MS (more than 50% total sulphides), SMS (less than 50% total sulphides) or lithology samples (non-mineralized country rock containing up to 10% sulphides). SG determinations were conducted by ALS Minerals and Golder and Associates and were based on short (6 to 12 cm) whole core samples. SG was determined based on the water displacement method.

 

In 1999, Kennecott collected 231 samples from pre-1998 drill core for SG analysis. The samples were from NQ- and BQ-sized core and averaged 7.27 cm in length. The samples were shipped to Anchorage but were not forwarded to a laboratory.

 

In 2004, NovaGold forwarded the 231 samples from the pre-1998 drill campaigns stored in Kennecott’s Anchorage warehouse, as well as 33 new samples from the 2004 drill program to ALS Minerals for SG determination.

 

Additionally, in 2004 NovaGold collected 127 usable field SG measurements. Samples were collected from HQ-sized core and averaged 9.05 cm in length. An Ohaus Triple Beam Balance was used to determine a weight-in-air value for dried core, followed by a weight-in-water value. The wet-value was determined by suspending the sample by a wire into a water-filled bucket. The SG value was then calculated using the following formula.

 

 

In 2011, NovaGold geologists stopped collecting short interval “point data” (as described above) within the mineralized zone, and instead collected “full-sample-width” determinations from existing 2008 split core and all of the sampled 2011 whole core. The samples averaged 1.69 m in length. Samples were collected continuously within mineralized zones and within a 2 to 3 m buffer adjacent to mineralized zones. A total of 193 measurements were collected. In 2011, 266 sample pulps were also submitted to ALS Minerals for SG determination by pycnometer analysis.

 

Between 2015 and 2019, Trilogy geologists collected SG data consistent with the 2011 full sample width water immersion campaign. A total of 2,406 specific gravity measurements were collected, with SG values ranging from 2.01 to 4.96. The samples averaged 1.49 m in length. Samples were collected continuously within mineralized zones and within a 2 to 3 m buffer adjacent to mineralized zones.

  
Arctic ProjectPage 113
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

In 2021 Ambler Metals collected 830 SG measurements from half-core intervals ranging from 0.08 to 2.19 m with SG values ranging from 2.01 to 2.88. In 2022, Ambler Metals collected 2,545 SG measurements from half-core intervals ranging from 0.14 m to 2.81 m with SG values ranging from 2.79 to 5.06.

 

8.1.4Sample Security

 

Security measures taken during historical Kennecott and BCMC programs are unknown to NovaGold, Trilogy, or Ambler Metals. Ambler Metals is not aware of any reason to suspect that any of these samples have been tampered with.

 

The 2004 to 2019 samples were always either in the custody of NovaGold personnel or at the assay laboratories, and the chain of custody of the samples is well documented.

 

The site has restricted access with only means of access via charter flight. Core is stored in a core storage yard and warehouse with the perimeter surrounded by a chain-link fence and secure locked gates. Shipment of core samples from site occurred on a drill hole by drill hole basis. Rice bags, containing two to four poly-bagged core samples each, were marked and labelled with the ALS Minerals address, project and hole number, bag number, and sample numbers enclosed. Rice bags were secured with a pre-numbered plastic security tie and a twist wire tie and then assembled into standard fish totes for transport by chartered flights on a commercial airline to Fairbanks, where they were met by a contracted expeditor for delivery directly to the ALS Minerals preparation facility in Fairbanks.

 

8.1.5Assay Laboratories

 

At least six laboratories were used during the Kennecott/BCMC time period, but mostly as check laboratories or for special analytical work. Accreditations are not known. The laboratories were independent of Kennecott/BCMC. Bondar Clegg, now ALS Minerals, was used for analyses conducted by Kennecott. During the BCMC work, analyses were conducted primarily by Union Assay Office Inc. of Salt Lake City, Utah.

 

Since 2004 NovaCopper, NovaGold, Trilogy metals, and Ambler Metals have used ALS Minerals (Fairbanks Alaska for sample preparation and Vancouver British Columbia as the primary laboratory. ALS Minerals is accredited for a number of specific test procedures including fire assay of gold by AA, ICP, or gravimetric finish, multi-element ICP and AA assays for silver, copper, lead and zinc. ALS Minerals is independent of NovaGold, NovaCopper, Trilogy, and Ambler Metals.

 

The laboratories used during the various exploration, infill, and step-out drill analytical programs completed on the Arctic Project are summarized in Table 8-2.

  
Arctic ProjectPage 114
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Table 8-2:Analytical Laboratories Used by Operators of the Arctic Project

 

Laboratory
Name
Laboratory
Location
Years
Used
Accreditation Comment
Union Assay
Office, Inc.
Salt Lake City, Utah 1968 Accreditations are not known. Primary Assay laboratory
Rocky Mountain
Geochemical Corp.
South Midvale, Utah 1973 Accreditations are not known. Primary and secondary assays
Resource Associates
of Alaska, Inc.
College, Alaska 1973, 1974 Accreditations are not known. Primary and secondary assays
Georesearch
Laboratories, Inc.
Salt Lake City, Utah 1975, 1976 Accreditations are not known. Primary and secondary assays
Bondar-Clegg &
Company Ltd.
North Vancouver, BC 1981, 1982 Accreditations are not known. Primary and secondary assays
Acme Analytical Laboratories Ltd. (AcmeLabs) Vancouver, BC 1998, 2011,

Accreditations are not known. 2012 and 2013 secondary check sample lab
SGS Canada Inc. Burnaby, BC 2010 ISO 90001 and ISO/IEC 17025. 2015 to 2019 secondary check lab
ALS Analytical Lab Fairbanks, Alaska (prep) and Vancouver, BC (analytical)

1998, 2004,
2005, 2006, 2007, 2008, 2011,
2012, 2013 2015, 2016, 2017, 2018, 2019

 

In 2004, ALS Minerals held ISO 9002 accreditations but updated to ISO 9001 accreditations in late 2004. ISO/International Electrotechnical Commission (IEC) 17025 accreditation was obtained in 2005. 2004 - 2019 primary assay laboratory

 

8.1.6Sample Preparation and Analytical Methods

 

Samples from the NovaGold/Trilogy/Ambler Metals programs were logged into a tracking system on arrival at ALS Minerals and weighed. Samples were crushed to 70% passing 2 mm, dried, and a 250 g split pulverized to greater than 85% passing 75 μm.

 

Samples were submitted for multielement analysis of a 0.25 gram sample by ICP MS following a 4-acid digestion, and for gold analysis of a 30 gram sample by FA with an AA finish. Over limit ICP-MS Cu, Pb, and Zn samples were resubmitted for analysis of a 0.4 gram sample by ICP-Atomic Emission Spectroscopy (AES) or AA following a 4 acid digestion. The overlimit value for Cu, Pb, and Zn is 10,000 ppm. Over limit gold results were resubmitted for analysis of a 30 gram sample by FA with a Gravimetric finish. The overlimit value for Au is 10 ppm. The Lower detection limits for Cu, Pb, and Zn by ICP-MS are 0.2 ppm, 0.5 ppm, and 2 ppm respectively. The lower detection limit for Au by FAAA is 0.05 ppm.

  
Arctic ProjectPage 115
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

8.2Quality Assurance/Quality Control

 

8.2.1Database Verification

 

In 1995, Kennecott entered the drill assay data information from the geologic core logs, and the downhole collar survey data into an electronic format. In 2006, NovaGold geologists verified the geologic data from the original paper logs against the Kennecott electronic format, and then merged the data into a Microsoft SQL database.

 

Between December 11th and January 9th, 2013, NovaCopper and GeoSpark Consulting completed a 100% verification of the collar survey, downhole survey, and sample interval data for the Arctic resource area. 20% of the pre-2004 assay data and ~26% of the 2004 to 2008 assay data were also verified at this time. Trilogy also retained GeoSpark to generate QA/QC reports for the NovaGold era 2004 to 2008 and NovaCopper/Trilogy era 2011, 2015, 2016, 2017, and 2019 drill campaigns. All data for the Arctic resource area is stored in the GeoSpark Core Database System created and managed by GeoSpark Consulting.

 

8.2.2NovaGold QA/QC Review of Historical Analytical Results

 

The current assay database contains results for 11,429 sample intervals including 3,077 (27%) historical hole sample intervals. Between 2004 and 2005 NovaGold completed a resampling program of historical drill holes. As a result, 85% of the assay intervals now have recent assay results from ALS Minerals. The re-assay program includes 289 re-assays of previously assayed historical hole sample intervals, representing approximately 17% of the original historical sampling program. In the database reviewed by Wood, the original Cu, Pb, and Zn values from the KCC/Utah laboratory results are given priority over ALS laboratory results for the 289 re-assay intervals. The database reviewed does not distinguish between previously sampled and newly sampled historical intervals or original and new assay values. Wood used the presence and absence of multielement analysis values to establish resampling and re-assay frequency. To determine assay priority used, Wood compared reported values to original logs.

 

Reduced to Major Axis (RMA) charts prepared by Wood (Figure 8-1 and Figure 8-2) which evaluates the paired original historical and re-assay values, indicates there is a 10% high bias in the historical Cu values after exclusion of 15 outliers and a 13% low bias in the historical Pb values after exclusion of 17 outliers. An inflection in the trend of the paired Cu values starting at 1% Cu may indicate the bias is related to an upper detection limit for the original assay procedure and or a change to an overlimit method. The Pb RMA chart shows a cluster of paired data with high biased original results. The low bias indicated by the RMA slope does not change after exclusion of these pairs.

  
Arctic ProjectPage 116
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Figure 8-1:Historical Cu Re-Assay RMA Chart

 

 

Source: Wood, 2022

  
Arctic ProjectPage 117
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Figure 8-2:Historical Pb Re-Assay RMA Chart

 

 

Source: Wood, 2022

 

The spatial distribution of the historical samples that remain as primary samples in the database is shown in Figure 8-3. These remaining historical assays are evenly distributed through the deposit area and are surrounded by assay intervals analysed since 2004. Spatial availability of QA/QC data is shown in Figure 8-4.

  
Arctic ProjectPage 118
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Figure 8-3:          Distribution of Historical Samples with Original Laboratory Results (Original Historic Assay Intervals are Indicated in Magenta, Recent Assays are Indicated in Green)

 

 

Source: Wood, 2022.

  
Arctic ProjectPage 119
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Figure 8-4:Spatial Availability of QA/QC Data

 

 

Source: Trilogy Metals, 2019.

 

8.2.3NovaGold/Trilogy (2004 to 2019) QA/QC Results Review

 

All core and pulp reject samples submitted to the ALS Minerals laboratory since 2004 were accompanied by standard, blank and duplicate control samples. Secondary laboratory check samples were analysed at Acme in Vancouver or SGS Burnaby. The secondary laboratory check samples were selected to represent the data population using a random selection of 5% of the samples within percentile range groups.

 

GeoSpark has prepared several reports summarizing the control sample results received between 2004 and 2019. The reports include CRM and blank control charts, pulp duplicate absolute difference precision charts and check sample scatter and absolute difference charts. The standard and blank control sample results were defined as failing when results were in excess of plus and minus three standard deviations from the expected mean for the standard. No threshold for check samples was provided in the reports.

 

  
Arctic ProjectPage 120
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Failing blanks or standards were re-analysed along with the adjacent samples to address potential accuracy deficiencies and to maintain quality assays in the database. Initial review of the assay certificates as they were reported identified a few instances of failing standards; for any fails the adjacent samples were also rerun.

 

The following QA/QC sections are based on a review of those reports.

 

8.2.3.12004

 

The 2004 exploration program included drilling and sampling of 11 drill holes amounting to 989 primary samples assayed within 61 assay certificates reported by ALS Minerals. The review of pulp duplicates, blanks and standards, and check control samples results showed acceptable levels of precision, accuracy, and between-laboratory bias.

 

8.2.3.22005

 

The 2005 exploration program included drilling and sampling of nine drill holes, AR05-0089 through AR05-0097, amounting to 1,228 primary samples assayed within 36 assay certificates reported by ALS Minerals.

 

The review of pulp duplicates, blanks and standards, and check samples during allowed for inference of a reasonable level of precision, good accuracy, and insignificant levels of bias within the primary sample results reported by ALS Minerals related to the 2005 data.

 

This detailed QA/QC review on the analytical results reported during 2005 allowed for overall confidence in the analytical result quality.

 

8.2.3.32006

 

The 2006 exploration program included drilling and sampling of 12 drill holes, AR06-98 through AR06-109, amounting to 1,175 primary samples analysed at ALS Minerals.

 

The review of pulp duplicates, blanks and standards, and check samples for the 2006 program allowed for inference of a good level of precision, good accuracy, and insignificant levels of bias within the primary 2006 sample results reported by ALS Minerals.

 

8.2.3.42007

 

The 2007 exploration program included drilling and sampling related to four drill holes, AR07-110 through AR07-113, amounting to 950 primary samples analysed at ALS Minerals.

 

The review of pulp duplicates, blanks and standards, and check samples for the 2007 program allowed for inference of a good level of precision, good accuracy, and insignificant levels of bias within the primary sample results reported by ALS Minerals.

 

8.2.3.52008

 

The 2008 exploration program included drilling and sampling related to 14 drill holes, AR08-0114 through AR08-0126 and drill hole AR08-0117w, amounting to 1,406 primary samples assayed within 44 assay certificates reported by ALS Minerals.

  
Arctic ProjectPage 121
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

The review of pulp duplicates, blanks and standards, and check samples for the 2008 program allowed for inference of a reasonable level of precision, good accuracy, and insignificant levels of bias within the primary sample results reported by ALS Minerals.

 

8.2.3.62011 (analysed in 2013)

 

Laboratory assay certificates FA13021131, FA13021132, FA13021133, FA13021134, and FA13021135 included results for six pulp duplicate pairs, six blank instances, and three standards. There were analysed by Geospark.

 

The duplicates for gold, silver, copper, lead, and zinc were found to correlate well with the primary sample results and it can be inferred that the primary results are of good precision.

 

Each of the blanks was analytical values within the control limits for the material. There are no issues with sample contamination and instrumentation difficulties. In addition, the accuracy can be inferred to be acceptable.

 

Each standard returned within the acceptable range for gold, silver, copper, lead, and zinc values; it is inferred that there is strong accuracy within the reported primary sample assay results.

 

A detailed review of secondary laboratory check sample results reported by ALS Minerals for the 2011 drill holes assayed in 2013 showed that the gold, silver, copper, lead, and zinc results indicated no material bias.

 

8.2.3.72015

 

The 2015 exploration program included drilling and sampling related to 14 drill holes, amounting to 1,0971 primary samples primary samples analysed at ALS Minerals. The review of pulp duplicates, blanks and standards, and check control samples results showed acceptable levels of precision, accuracy, and between-laboratory bias.

 

8.2.3.82016

 

The 2016 exploration program included drilling and sampling related to 13 drill holes, amounting to 1,181 primary samples primary samples analysed at ALS Minerals. The review of pulp duplicates, blanks and standards, and check control samples results showed acceptable levels of precision, accuracy, and between-laboratory bias.

 

8.2.3.92017

 

The 2017 exploration program included drilling and sampling related to 5 drill holes, amounting to 313 primary samples primary samples analysed at ALS Minerals. The review of pulp duplicates, blanks and standards, and check control samples results showed acceptable levels of precision, accuracy, and between-laboratory bias.

 

8.2.3.102019

 

The 2017 exploration program included drilling and sampling related to 9 drill holes, amounting to 586 primary samples primary samples analysed at ALS Minerals. The review of pulp duplicates, blanks and standards, and check control samples results showed acceptable levels of precision, accuracy, and between-laboratory bias.

  
Arctic ProjectPage 122
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

8.2.4Density Determination QA/QC

 

8.2.4.1Laboratory vs. Fields Determinations

 

Paired laboratory and field determinations from for mineralized zone SG measurements from 1998 and the 2004 program show very low variation.

 

In 2010, NovaGold measured 50 unwaxed samples representing a full range of SG values for a variety of lithologies and then submitted the samples to ALS Minerals for wet-dry SG determinations after being sealed in wax. The mean difference between the NovaGold unwaxed and the ALS Minerals waxed SG determinations was 0.01.

 

In 2011, NovaGold submitted 266 pulps to ALS Minerals for determination of SG by pycnometer (ALS code OA-GRA08b). Figure 8-5 shows the paired pycnometer and whole core water immersion results compare well. The chart shows the pycnometer results display a slight low bias. Generally, intact samples are considered more acceptable for accurate SG determinations since they more closely resemble the in-situ rock mass.

  
Arctic ProjectPage 123
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Figure 8-5:Graph showing Good Agreement between Wet-Dry Measured Specific Gravity and Pycnometer Measured Specific Gravity

 

 

Source: West, A., 2014

 

8.2.4.2Stoichiometric Method

 

Trilogy compared full sample length water immersion SG determinations with stoichiometric calculated SG values for 279 sample intervals that have copper, zinc, lead, iron, and XRF barium results, the major constituents of the sulphide and sulphate species for the Arctic deposit. Figure 8-6 shows That overall, there is good correlation between the two SG populations although the stoichiometric estimates are slightly lower with increasing SG.

  
Arctic ProjectPage 124
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Figure 8-6:Measured vs. Stoichiometric Specific Gravities

 

 

Source: West, A., 2014.

 

8.2.4.3Multiple Regressions Method

 

The best fit to the data was achieved by using the multiple regression tool in Microsoft Excel on barium, iron, zinc, and copper for the entire dataset (Figure 8-7). The estimate correlates very well (R2=0.9678) with observed data and has a sinusoidal pattern that fits the low and moderately high SG very well and has high bias for moderate SG values and a low bias for very high SG values. The resultant SG formula is as follows:

 

SG(Regression)= 2.567 + 0.0048*Cu(wt%) + 0.045*Fe(wt%) + 0.032*Ba(wt%) + 0.023%*Zn(wt%)

  
Arctic ProjectPage 125
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Figure 8-7:Scatter Plot Showing the Measured Specific Gravity vs. Multiple (Copper, Iron, Zinc, Barium) Regression

 

 

Source: West, A., 2014.

 

8.2.4.4Random Forest Machine Learning Method

 

A random forest classification method was used to assist prediction of SG values for 12,039 sample intervals. Information regarding the inputs to the random forest method were not available for review. A comparison of 8,542 paired predicted and paired measured values shows a reasonable correlation between measured and random forest assisted prediction values but an obvious low bias low bias for predicted values (Figure 8-8). The bias is unexplained but may be a result of insufficient Ba analyses. The Random Forest predicted SG values were used in the current resource estimate and the impact of the bias is discussed in Section 11.5.1.

  
Arctic ProjectPage 126
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Figure 8-8:Reduced to Major Axis (RMA) Scatter Plot Showing the Predicted and Measured SG Values

 

 

Source: Wood, 2022.

 

8.2.4.5Comments on Density Determinations

 

Stoichiometric and multiple regression method results generally produce SG values that compare well with measured results. SG values predicted using random forest methods produce biased results. In the opinion of the QP, use of these predicted SG valued for estimation of SG in the block model may introduce a significant low bias for high SG areas.

 

8.2.5Acid-Base Accounting Sampling QA/QC

 

SRK conducted a QA/QC review of the 2010 ABA dataset for the Arctic Project in July 2011 and concluded that data quality was acceptable.

 

QA/QC of the ABA dataset generated in 2015 and 2016 was conducted by SRK in November 2016 through January 2017 and data quality was concluded to be acceptable.

 

SRK conducted a QA/QC review of the ABA dataset from the various kinetic test samples in July 2019, June 2021, and November 2022, concluding that the data quality was acceptable.

 

SRK conducts monthly QA/QC review of kinetic test leachates for all operating kinetic tests. The kinetic test program also includes duplicate and blank tests. Data are reviewed for ion balance, potential contamination, reproducibility, changes in long-term trends, and anomalous spikes in the data. Where considered necessary by SRK, the laboratory is asked to rerun leachates from kinetic tests to investigate QC concerns.

  
Arctic ProjectPage 127
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

8.3Comments on Sample Preparation, Analyses and Security

 

The drill core sampling procedures at site, the primary laboratory sample preparation and analytical procedures, and the QAQC and security procedures applied by NovaGold and Trilogy for samples collected and analyzed since 2004 are in the QP’s opinion appropriate for the mineralization style observed at Arctic and provide adequate confidence in the reported assay values. Historical copper and lead values (pre 2004) that remain in the primary assay database appear to be biased high and low, respectively. The broad spatial distribution of these original historical samples and density of samples with more recent assay values surrounding these samples in the QP’s opinion reduces the risk associated with these observed biases and are suitable to be used in resource estimation. 

  
Arctic ProjectPage 128
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

9DATA VERIFICATION

 

Wood reviewed database verification and laboratory QA/QC reports and made data entry error spot checks, inspected down hole survey results for anomalous kinks and excessive bends in the drill hole traces, reviewed reports summarizing the results of drill core sampling and assaying completed since 2004, reviewed the assay database for gaps and overlaps, and reviewed the historical re-assay program results. The following two significant issues were observed:

 

•A significant high bias in historic Cu and low bias in historic Pb assay results (see Section 8).

 

•Apparent low bias in Random Forest assisted specific gravity predictions (see Section 8).

 

Excessive between-survey deviation was observed in 30 historical drill holes and transcription errors related to priority of KCC/Utah laboratory assay results were observed in two randomly selected holes. Database adjustments by NovaGold and NovaCopper include resurvey and transformation of historical hole collar coordinates from UTM NAD27 feet to UTM NAD83 metres, historical down hole survey bearings from quadrant to azimuth and down hole survey depth from feet to metres, and gold and silver results from ounces per ton to grams per tonne. A spot comparison comparing original result documents and the database revealed transcription errors and inconsistencies in data selection priority. In the QP’s opinion, these issues are not expected to have a material impact on the grade estimation but should be resolved in the next model.

 

In the current assay table historical sample interval assay results are given priority over the historic sample interval re-assay results. In the QP’s opinion, this is not expected to have a material impact on the grade estimation but using the re-assay results would further mitigate the risk associated with the observed biases in the historical Cu and Pb values, as discussed in Section 8.

 

There are no QAQC analysis for the deleterious variables (As, Sb, Cd, Hg, Fe, S).

 

Overall, the database verification and management and the laboratory QAQC monitoring completed by NovaGold, Trilogy and Ambler Metals has resulted in a reasonably reliable drill hole database suitable for supporting the Mineral Resource estimated for the Arctic deposit. Some deficiencies exist that when rectified will make the drill hole database even more robust.

 

As referenced in Section 6, the interplay between the complex local stratigraphy, the isoclinal F1 event, the overturned south verging F2 event and the series of post-penetrative deformational events often makes district geological interpretation extremely difficult at a local scale. The current geological model captures the complexity reasonably well, but it is possible there is more variability at the local scale than is modelled. Tight spaced drilling in key areas of the deposit is warranted.

 

9.1Comments on Data Verification

 

It is the QP’s opinion that the drill database and topographic information for the Arctic deposit are reliable and sufficient to support the current estimate of Mineral Resources. 

  
Arctic ProjectPage 129
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

10MINERAL PROCESSING AND METALLURGICAL TESTING

 

10.1Introduction

 

Metallurgical studies have spanned over 30 years with metallurgical testwork campaigns undertaken at the Kennecott Research Centre (KRC) in Salt Lake City, Utah; Lakefield Research Ltd., Lakefield Ontario (Lakefield); SGS Mineral Services, Burnaby, BC (SGS); and ALS Metallurgy, Kamloops, B.C. (ALS Metallurgy). Metallurgical testwork laboratories are typically not accredited. The KRC was not independent of Kennecott at the time the testwork was completed; all other laboratories were and are independent of NovaGold, Trilogy and Ambler Metals.

 

The current accreditation status of the KRC is unknown. Lakefield joined the SGS group in 2002. SGS and ALS Metallurgy conform to the requirements of ISO/IEC 17025 for specific tests as listed on their respective scope of accreditation documents, which can be found at www.scc.ca/en/search/laboratories.

 

The testwork conducted in 2012 through 2019 was under the technical direction of International Metallurgical and Environmental Inc (IME). Testwork prior to 2012 is considered historical in nature and has provided some guidance to the project development but is not used in any predictive manner or used in the generation of design criteria. The testwork was focused on a conventional process flowsheet employing crushing, grinding, bulk flotation of a copper and lead concentrate, flotation of a zinc concentrate and the subsequent separation of copper and lead values via flotation.

 

Various metallurgical testwork programs were conducted in 2021 through 2022 at ALS Metallurgy, SGS, and Metso-Outotec Group (Metso Group). ALS Metallurgy completed several testwork programs, including flotation testing with the pre-flotation circuit only to establish talc performance; further flowsheet development testwork to investigate the benefits of sequential flotation versus the original bulk flow sheet; and a variability testwork to support the development of improved metallurgical recovery models.

 

SGS conducted SAG Power Index (SPI®) tests to investigate the effect of friable ores on the plant throughput.

 

Metso Group conducted talc circuit modelling using the data obtained from the ALS Metallurgy pre-flotation testwork program to investigate the benefits of talc circuit open and closed-circuit cleaning. The Mesto Group also conducted dewatering and filtration testwork on the pre-flotation concentrate and final tailings generated from the pre-flotation testwork program.

 

The LOM average metallurgical performance forecasts, based on recent testwork completed and expected mine production grades is shown in Table 10-1. This overall project metallurgical accounting is based on locked cycle testwork, conducted on a distribution of samples from the deposit. Since 2012, testwork has been focused on optimizing the performance of the recommended flowsheet.

 

  
Arctic ProjectPage 130
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Table 10-1: Summary of Overall Forecast Metal Recovery – Arctic Deposit

 

      Concentrate Grade   Metal Recoveries 
Process Stream  Mass
%
   Cu
%
   Pb
%
   Zn
%
   Au
g/t
   Ag
g/t
   Cu
%
   Pb
%
   Zn
%
   Au
%
   Ag
%
 
Process Feed   100.0    2.11    0.56    2.90    0.42    31.8    -    -    -    -    - 
Copper Conc.   6.3    30.3    1.7    0.7    3.4    160.5    92.1    19.4    1.6    52.2    32.4 
Lead Conc.   0.6    2.0    53.9    5.9    14.1    2425.8    0.6    61.3    1.3    21.4    48.8 
Zinc Conc.   4.7    1.0    0.5    53.6    0.3    38.3    2.2    4.4    88.4    3.2    5.7 
Tailings   88.4    0.1    0.1    0.3    0.1    4.6    5.1    14.8    8.7    23.2    13.1 

 

A summary of the testwork programs completed for the Arctic Project, dates of testwork and testwork objectives is shown in Table 10-2.

 

Table 10-2:Summary of Testwork Chronology and Reporting

 

Laboratory     Project No.     Report Date     Testwork Objectives  
Historical Testwork
KRC - 1970-1976 Preliminary mineralogy and flotation testing
Testwork from 2012 to 2019
Lakefield - 1999 Preliminary flotation testwork.
SGS Burnaby 50173-001 Oct. 4, 2012 Flotation scoping and locked cycle testing (LCT), Bond work index, (BWi), using 4 large composite samples
ALS Metallurgy KM5000 Mar. 27, 2017 Flotation scoping and LC Testing, BWi, using a master composite and 14 variability samples, preliminary copper/lead separation testwork.
ALS Metallurgy KM5372 July 11, 2017 Additional copper/lead separation testwork and detailed precious metal mineralogy
ALS Metallurgy KM5567 Feb. 26, 2018 Talc optimization testwork and copper/lead separation testwork.
JKTech 18017/P14 July 2018 Drop Weight testing of Comp. sample
JKTech 19017/P16 Sept. 2019 SMC testing of Variability Samples
Inter. Metallurgy - April 22, 2019 Cyanide destruction testwork
Pocock Industrial - August 2019 Thickening and filtration testing
Testwork from 2021 to 2022
Metso-Outotec Group - Nov. 3, 2021 Talc pre-flotation simulations
Metso-Outotec Group 93730- TQ1-TM001-R0

Oct 8, 2021

Dewatering testing for Talc concentrate and final tailings.
Metso-Outotec Group 93720- TQ1-TM001-R1

Oct 13, 2021

Filtration testing for Talc concentrate and final tailings.
ALS Metallurgy KM6442 Dec. 15, 2021 Talc optimization testwork
SGS Burnaby 19157-01 June 3, 2022 SAG Power Index testing on 15 samples
ALS Metallurgy KM6498 May 24, 2022 Flotation development testwork
ALS Metallurgy KM6498 July 14, 2022 Flotation development and Variability testwork

 

Detailed testwork has concluded that the mineralization is well-suited to the production of separate copper, lead and zinc concentrates. There are no significant metallurgical impediments outside of the presence of talc minerals and fluorine levels in the lead concentrates as observed in the various testwork programs. The presence of naturally hydrophobic talc minerals was consistently observed, and talc can be effectively removed from the flotation process prior to base metal flotation. There is little reason to expect concentrates will be impaired by talc contamination as talc can be effectively removed from the base metal flotation process, mitigating the potential of talc diluting the base metal concentrates. Talc and fluorine levels will be managed by optimization of the talc pre-float circuit, effectively removing talc and fluorine to ensure the quality of the lead concentrate.

  
Arctic ProjectPage 131
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

The flotation process uses industry standard flotation processes, with three major rougher flotation stages and re-grinding and flotation cleaning of copper/lead bulk concentrates and zinc concentrates. Copper and lead are separated from a bulk copper and lead concentrate. Testwork was broken into separate phases, with copper/lead separation being a key distinct phase of testing in the later stages of the program. The full-scale metal recovery and upgrading process can be well-managed with modern process control and ensuring that variability of feed grades, including talc content, can be accommodated.

 

Ancillary testwork including solid-liquid separation and cyanide detoxification testwork was completed.

 

10.2Historical Testwork Review

 

10.2.1Metallurgical Testing – Kennecott Research Centre (1968 to 1976)

 

Between 1970 and 1976, KRC conducted two initial mineralogical studies to evaluate and identify the potential beneficiation or metallurgical options. This early work was a cornerstone of planning later phases of testwork.

 

In the 1970 mineralogy investigation, KRC reported that the host rock of the mineralization is generally muscovite, chlorite, or talc schist. Principal economic minerals in the deposit were identified as chalcopyrite, sphalerite, and argentiferous galena.

 

The grain sizes of sulphide mineral particles ranged from sub-micron to a maximum of several centimetres; most of the sulphide particles were relatively large (coarser than 74 µm). KRC noted that the target sulphide minerals should be liberated from gangue at a primary grind size of 100% passing 100 mesh.

 

In 1976, KRC conducted preliminary comminution testwork using the standard BWi determination procedure (refer to discussion in Section 10.3.4).

 

Between 1968 and 1976, KRC carried out initial flotation testing. The focus was on selective flotation to provide separate copper, lead, and zinc concentrates for conventional smelting. In 1968, initial amenability testing was conducted on core composites from eight diamond drill holes (which is not available to review). Other tests were conducted in 1972 on four composites from three additional diamond core holes. The laboratory-scale tests conducted between 1968 and 1976 included the conventional selective flotation approach to produce separate lead, copper, and zinc concentrates.

 

The major problem encountered for the tests by KRC was the separation between lead and copper minerals, and the reduction of zinc deportment to the copper and lead concentrates. The copper concentrates produced from open circuit tests contained 30 to 32.4% Cu, 0.45 to 3.48% Zn and 0.15% to 1.31% Pb. The copper recoveries were < 80.7%. The lead concentrate grades were low, ranging from 17.1 to 36.5%.

 

Sphalerite flotation was generally efficient, producing zinc flotation concentrates grading approximately 55% zinc. Because of the low gold content of the test samples, no appraisal was made of gold recoveries.

  
Arctic ProjectPage 132
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

From 1975 and 1976, large diameter cores from 14 drill holes were used for more detailed testing. Two composites labelled as Composite No. 1 (Eastern Zone) and Composite No. 2 (Western Zone), were prepared. The test program included bench-scale testing of various process parameters for sequential flotation, including locked cycle tests. A talc flotation step prior to sulphide flotation was considered to be necessary, as previously established. It was determined that chalcopyrite and sphalerite could be recovered into separate commercial grade copper and zinc concentrates. However, the production of a selective high-grade lead concentrate was not successful.

 

Using zinc sulphate and sodium bisulphate to suppress galena and sphalerite, 90% of the copper was recovered into a concentrate containing 26% Cu, 1.5% Pb, and 6% Zn. KRC indicated that because of close interlocking of chalcopyrite and sphalerite, the zinc content of the copper concentrate could not be reduced to below 6% without sacrifice of copper recovery.

 

Only low-grade silver-bearing lead concentrates were obtained. Under the best test conditions, approximately 65% of the silver reported to the low-grade lead concentrate. Some of the silver in the mineralization occurred as tetrahedrite, which was recovered to the copper concentrate. The KRC testwork did not focus on bulk copper and lead flotation and the attempt to focus on a sequential copper-lead-zinc flowsheet is considered a technical error. Subsequent testwork moved to a bulk copper-lead flotation process and subsequent separation of a bulk concentrate into copper and lead concentrates. Metallurgical results have improved with the change to a bulk copper-lead flowsheet in later testwork.

 

10.2.2Metallurgical Testwork – Lakefield (1998 to 1999)

 

In 1998, Lakefield conducted a metallurgical test program to confirm and improve upon the results from the KRC testwork program. The Lakefield work was carried out on test composites prepared from three separate drill holes. The test composite from the upper portion of AR-72 was identified as being low in talc content; however, composites from the lower portion of AR-72 were high in talc content, as were AR-74 and AR-75. The head analyses for the respective resulting test composites are summarized in Table 10-3.

 

Table 10-3:Head Analysis, Lakefield Research 1999

 

Composite  Talc   Cu
(%)
   Zn
(%)
   Pb
(%)
   Fe
(%)
   Au
(g/t)
   Ag
(g/t)
   ST
(g/t)
 
Hole #72 – Upper  Low    5.28    7.16    1.86    15.6    1.14    72.3    23.4 
Hole #72 – Lower  High    2.68    5.85    1.34    13.0    1.60    75.9    16.9 
Hole #74  High    2.46    4.43    0.90    17.0    1.55    45.1    23.7 
Hole #75  High    2.35    8.36    1.95    15.7    1.23    77.3    21.8 

 

Note:ST = total sulphur.

 

Lakefield conducted a series of five flotation tests using a flowsheet similar to the one adopted in the 2012–2019 testwork and incorporated a bulk copper-lead flotation stage followed by copper and lead separation.

 

The bulk copper-lead rougher concentrate was reground and subjected to two stages of cleaner flotation and one stage of copper and lead separation, using zinc oxide and sodium cyanide to depress the copper while floating the lead. The resulting lead rougher concentrate was upgraded with two stages of cleaner flotation to produce the final lead concentrate. The lead rougher flotation tailings were the final copper concentrate.

  
Arctic ProjectPage 133
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

The zinc rougher concentrate was reground and upgraded with two stages of cleaner flotation. The results of the best open circuit flotation test for the low talc composite are summarized in Table 10-4. The test results are indicative of the results obtained later in test programs and optimization of the process would improve these results. Of note, is the high recovery of precious metals to the lead concentrates, which was also confirmed in later testwork programs.

 

Table 10-4:Flotation Test on Ambler Low Talc Composite

 

      Assays   Distribution (%) 
Item  Weight
(%)
   Cu
(%)
   Pb
(%)
   Zn
(%)
   Au
(g/t)
   Ag
(g/t)
   Cu   Pb   Zn   Au   Ag 
Lead Concentrate   2.22    6.5    58.8    3.43    38.9    1,703    2.7    68.1    1.1    48.7    47.3 
Copper Concentrate*   15.76    29.1    1.2    2.61    1.23    73.5    86.8    9.8    5.7    10.9    14.5 
Zinc Concentrate   9.91    0.44    0.36    59.1    0.65    14.7    0.8    1.9    81.1    3.6    1.8 
Zinc Tailings**   61.6    0.11    0.13    0.22    0.4    3.47    1.2    4.3    1.9    13.7    2.7 
Head (Calculation)   100.0    5.28    1.92    7.21    1.78    80.1    100.0    100.0    100.0    100.0    100.0 

 

Notes:

 

*Pb Rougher Tailings

**Does not include intermediate cleaner tailings.

 

Lakefield also conducted flotation tests on each of the high talc composites using a test procedure similar to the one used for the low talc composite, with the exception that carboxymethyl cellulose (CMC) was added as a depressant for talc. The results of these tests showed that the presence of talc had a significant negative impact on the copper and lead mineral recoveries. Lakefield also used talc pre-flotation prior to sulphide flotation in an effort to reduce talc effect on base metal flotation. It appears that the talc pre-flotation improved copper and lead metallurgical performances. However, the test results showed that elevated talc content had a significant effect in copper and lead flotation response.

 

In the test report, Lakefield also concluded that grind particle size as coarse as approximately 80% passing 74 µm provided good results.

 

10.3Mineralogical and Metallurgical Testwork – 2012 to 2019

 

10.3.1Introduction

 

Testwork conducted prior to 2012 is considered relevant to the Arctic Project, but predictive metallurgical performance is best estimated from testwork conducted on sample materials obtained from exploration work under the direction of Trilogy, conducted from 2012 to 2019 (refer to Table 10 2).

 

  
Arctic ProjectPage 134
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

In 2012, SGS conducted a test program on the samples produced from mineralization zones 1, 2, 3, and 5. Drill core samples were composited from each of the zones into four different samples for the SGS testwork which included process mineralogical examination, grindability and flotation tests.

 

SGS used quantitative evaluation of materials by scanning electron microscopy QEMSCAN™, to develop grade limiting/recovery relationships for the composites.

 

Standard Bond grindability tests were also conducted on five selected samples to determine the BWi and abrasion index (Ai).

 

The flotation testwork investigated the effect of various process conditions on copper, lead and zinc recovery using copper-lead bulk flotation and zinc flotation followed by copper and lead separation. The testwork conducted in 2012 at SGS forms the basis for predicting metallurgical performance of the mineralized zone in terms of recovery of copper and lead to a bulk concentrate as well as predicting zinc recovery to a zinc concentrate.

 

In 2017, testwork moved to ALS Metallurgy and was focused on predicting the expected performance of the proposed copper and lead separation process, which required the use of larger test samples. A pilot plant was operated to generate approximately 50 kg of copper and lead concentrate, which became test sample material for use in locked cycle testing of the copper and lead separation process. This testwork allows for the accurate prediction of copper and lead deportment in the process as well as provided detailed analysis of the final copper and lead concentrates, expected from the process. Additional metallurgical testwork in the form of variability samples being subject to grindability and baseline flotation tests was also completed.

 

10.3.2Test Samples

 

The 2012 test program used 90 individual drill core sample intervals totalling 1,100 kg. Individual samples were combined into four composites representing different zones and labelled as Composites Zone 1 & 2, Zone 3, Zone 5, and Zone 3 & 5. The sample materials used in the 2012 test program at SGS were specifically obtained for metallurgical test purposes. The drill cores were stored in a freezer to ensure sample degradation and oxidation of sulphide minerals did not occur.

 

The head grades of the composites from the 2012 SGS testwork program is shown in Table 10-5.

 

Table 10-5:SGS Burnaby Head Grades – Composite Samples – 2012

 

Sample  Cu
(%)
   Pb
(%)
   Zn
(%)
   Fe
(%)
   S
(%)
   Au
(g/t)
   Ag
(g/t)
   MgO
(%)
 
Zone 1 & 2   2.63    0.95    3.43    7.73    8.36    0.79    57.6    5.78 
Zone 3   3.56    1.73    8.58    17.5    25.8    0.67    80.4    1.94 
Zone 3 & 5   4.41    1.60    7.76    16.7    23.5    0.97    82.0    3.96 
Zone 5 B   2.56    1.33    5.68    15.8    21.2    1.16    63.0    0.90 

 

The 2017 test program involved the collection of approximately 4,000 kg of drill core from five drill holes. The core was shipped in its entirety to ALS Metallurgy for use in grinding and flotation testwork. Fifteen separate composites samples were generated by crushing defined intercepts of mineralization. These samples were riffle split to generate 15 individual samples which were separately tested for grindability and flotation response, as well, a large portion of each sample was blended to make a single large composite sample for use in copper-lead separation testwork. The copper-lead separation testwork involved operating a pilot plant for the production of a single sample of copper/lead concentrate which was then used in bench-scale flotation testing, including open circuit flotation tests as well as locked cycle flotation tests.

  
Arctic ProjectPage 135
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

The feed grades of samples used in the 2017 testwork program at ALS Metallurgy are shown in Table 10-6.

 

Table 10-6:ALS Metallurgy Head Grades – Composite Samples – 2017

 

Sample ID  Cu
(%)
   Pb
(%)
   Zn
(%)
   Fe
(%)
   S
(%)
   Au
(g/t)
   Ag
(g/t)
  

Mg 

(%) 

 
Var. Comp 1   5.05    1.53    7.40    15.0    24.4    0.68    64    2.69 
Var. Comp 2   2.06    0.25    1.05    4.6    3.68    0.52    34    11.2 
Var. Comp 3   1.67    0.80    2.93    6.6    4.93    0.10    43    7.51 
Var. Comp 4   2.25    0.24    3.15    13.1    16.2    0.20    18    6.26 
Var. Comp 5   3.68    1.01    5.55    10.6    13.9    0.78    69    7.16 
Var. Comp 6   1.02    0.36    1.61    8.0    9.45    0.45    24    1.92 
Var. Comp 7   1.75    0.58    2.71    8.9    12.9    0.21    32    3.46 
Var. Comp 8   3.00    0.68    4.65    10.0    13.3    0.75    56    9.18 
Var. Comp 9   5.46    1.37    6.60    9.2    14.0    0.15    50    5.65 
Var. Comp 10   4.16    1.24    5.63    13.4    22.1    0.06    34    3.58 
Var. Comp 11   2.78    0.40    4.56    12.7    16.9    0.64    40    6.84 
Var. Comp 12   1.53    0.07    0.56    4.4    3.15    0.59    16    10.6 
Var. Comp 13   1.98    0.30    1.48    6.2    6.25    0.26    38    9.61 
Var. Comp 14   2.37    2.43    9.50    15.1    23.7    0.84    62    0.81 
PP Comp.   2.92    0.86    4.66    10.8    13.8    0.56    41    5.93 

 

Shown in Figure 10 1 are the copper and zinc grades of the SGS and ALS Metallurgy testwork samples compared to the designed plant feed grades. The ALS Metallurgy samples are more representative of the expected mine production due to the lower range of copper and zinc grades that are available. There is a strong correlation between copper and zinc grades within the test samples. The metallurgical balance shown in Table 10-1 is based on LOM feed grades and is consistent with the LOM data point shown in Figure 10-1.

 

Shown in Figure 10 2 are the copper and lead grades of the various test samples used in the ALS Metallurgy and SGS test programs. There is a consistent copper to lead ratio of approximately 3.5–4.5 within the test samples and the LOM grades are shown to be within the distribution of test samples.

  
Arctic ProjectPage 136
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Figure 10-1:Cu and Zn Test Sample Grades for ALS Metallurgy/SGS Burnaby Programs

 

 

 

Source: Austin, 2020.

 

Figure 10-2:Cu and Pb Test Sample Grades for ALS Metallurgy/SGS Burnaby Programs

 

 

Source: Austin, 2020.

  
Arctic ProjectPage 137
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

The volume of talc observed in the various test samples ranged from a low of zero contained talc to a high of 42% by weight floatable talc. Shown in Figure 10-3 is the distribution of talc within both the SGS and ALS Metallurgy samples. The estimated LOM talc content is estimated at 5.1%. Only one of the SGS test samples exceeded the LOM talc content, while 11 of the 14 ALS Metallurgy samples exceeded the LOM talc content. A composite of the ALS Metallurgy samples was approximately twice the talc content of the expected mine production. Talc, while a significant issue for the flotation process is likely overestimated in terms of its potential negative impact, owing to the large number of high talc samples seen in the ALS Metallurgy sample set. It has also been clearly demonstrated that even high volumes of talc can be effectively removed from the base metal flotation process and remove the impact of talc diluting base metal concentrates.

 

Figure 10-3:Distribution of Talc Content within the 2012 and 2017 Test Samples

 

 

 

Source: Austin, 2020.

 

10.3.3Mineralogical Investigations

 

SGS used QEMSCAN™ to complete a detailed mineralogical study on each composite to identify mineral liberations and associations. The mineral modal abundance for the composites is shown in Table 10-7.

 

The mineralogical results obtained by SGS were typical for the balance of other samples observed in the ALS Metallurgy QEMSCAN analysis and no significant liberation or changes in mineral occurrences were observed in later QEMSCAN work. Metal and talc grades all were observed to be variable in the mineralogical evaluations but did not significantly impact textural relationships.

  
Arctic ProjectPage 138
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Table 10-7:Mineral Modal Abundance for Composite Samples – SGS Burnaby 2012

 

   Mass (%) 
Mineral  Zone 1 & 2   Zone 3   Zone 3 & 5   Zone 5 
Chalcopyrite   9.2    9.4    12.2    6.4 
Bornite   0.02    0.01    0.03    0.4 
Tetrahedrite   0.1    0.4    0.2    0.2 
Antimony   0.03    0.2    0.005    0.3 
Galena   1.3    2.1    2.1    2.1 
Sphalerite   7.2    14.6    14.3    11.3 
Pyrite   6.7    30.4    23.8    27.8 
Pyrrhotite   2.2    0.2    0.2    1.4 
Arsenopyrite   0.5    0.1    0.6    2.2 
Other Sulphides   0.1    0.1    0.2    0.1 
Quartz   30.2    8.6    9.0    16.6 
Feldspar   0.9    0.2    0.4    0.3 
Magnesium-Chlorite   11.9    3.4    2.8    1.1 
Talc   2.0    0.8    6.3    0.1 
Micas   14.2    1.9    7.0    9.4 
Cymrite   3.5    3.9    1.8    1.9 
Clays   0.6    0.05    0.2    0.1 
Iron Oxides   0.3    0.3    0.5    0.3 
Carbonates   3.4    1.3    4.2    2.0 
Barite   3.0    21.8    13.4    14.5 
Fluorite   1.7    0.1    0.4    1.2 
Other   1.1    0.3    0.4    0.4 
Total   100.0    100.0    100.0    100.0 

 

The mineralogical study showed that the mineralogy of all four composites was similar, but mineral volumes were highly variable between samples. Each composite was composed mainly of pyrite, quartz, and carbonates. However, Composite Zone 1 & 2 contain approximately 30% quartz, compared to 8.6% for Composite Zone 3, and 16.6% for Composite Zone 5. The study also showed that Composite Zone 1 & 2 had the lowest pyrite content (6.7%) while Composites Zone 3 and Zone 5 contained approximately 30.4% and 27.8% pyrite, respectively.

 

In all samples, the major floatable gangue minerals were talc and pyrite. Chalcopyrite was the main copper carrier. Combined bornite, tetrahedrite, and other sulphides accounted for less than 5% of the copper contained in the various samples. Galena was the main lead mineral and sphalerite was the main zinc mineral.

 

All the composites contained a significant amount of talc, which may have the potential to dilute final concentrates. Therefore, SGS recommended that talc removal using flotation be employed prior to base metal flotation and this recommendation was carried throughout all testwork.

  
Arctic ProjectPage 139
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

At a grind size of approximately 80% passing 70 µm, chalcopyrite liberation ranged from approximately 80 to 87% (free and liberated combined) for all composites. The chalcopyrite is mostly free, with 7 to 10% associated with pyrite. For all composites, galena liberation ranged from 54 to 68% (free and liberated combined). Sphalerite liberation varied between 81 to 89%. Sphalerite is mostly free with about 7 to 10% associated with pyrite. Mineral liberation plays a significant role in removing talc during the pre-float stage and finer grinding benefits the removal of talc prior to sulphide flotation and subsequent re-grinding.

 

10.3.4Comminution Testwork

 

KRC completed BWi tests on seven specific samples from the Arctic project in the 1976 testwork program. SGS conducted comminution tests on five selected samples during their testwork program in 2012. The SGS tests included the BWi tests and Ai tests. ALS Metallurgy also conducted BWi determinations on a number of samples during the 2017 to 2019 testwork program and these results from all three programs are summarized in Table 10-8. The BWi values range from 6.5 to 11 kWh/t for the materials sampled. The data indicates that the samples are relatively soft to ball mill grinding. The Ai ranged from 0.017 to 0.072 g, which indicates that the samples are not abrasive.

 

Grinding testwork for semi-autogenous grind (SAG) mill characterization was completed in conjunction with the ALS Metallurgy 2017 work. JKTech completed SMC and DWi testing of samples specifically selected for SAG amenability testing. Additional BWi determinations were also completed on the samples selected for SMC testwork; those BWI test results are included in Table 10-9 with the SMC results. Drill core data for the various SMC samples are contained in Table 10-8.

 

A total of 46 BWi tests were completed.

 

Table 10-8:Bond Ball Mill Work Index and Abrasion Index Test Results

 

Sample  Mesh of
Grind Size
   P80
(µm)
   BWi
(kWh/t)
   Ai
(g)
 
                 
1976 KRC samples
Hole – 11B   150    -    11.96    - 
Hole – 34B   150    -    8.33    - 
Hole – 34B   150    -    5.71    - 
Hole – 34B   150    -    11.3    - 
Hole – 34C   150    -    9.98    - 
Hole – 48A   150    -    10.5    - 
Hole – 48B   150    -    9.60    - 
2012 SGS samples
MET – 1105341   150    88    6.7    0.032 
MET – 1106043   150    88    6.5    0.019 
MET – 1105868   150    85    7.4    0.030 
MET – 1106033   150    87    9.3    0.072 
MET – 1105853   150    89    11.1    0.017 
2017 ALS Metallurgy samples
Composite 1   106    106    9.0    - 
Composite 2   300    228    8.6    - 
Composite 3   300    232    8.1    - 
Composite 4   300    226    6.6    - 
Composite 5   300    233    7.1    - 

  
Arctic ProjectPage 140
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Sample  Mesh of
Grind Size
   P80
(µm)
   BWi
(kWh/t)
   Ai
(g)
 
Composite 6   300    233    6.1    - 
Composite 7   300    223    6.2    - 
Composite 8   300    234    9.0    - 
Composite 9   300    236    6.4    - 
Composite 10   300    237    5.3    - 
Composite 11   300    225    7.2    - 
Composite 12   300    234    10.3    - 
Composite 13   300    229    10.1    - 
Composite 14   300    231    6.4    - 
PP Composite 1   300    231    7.2    - 

 

ALS Metallurgy, in conjunction with the JKTech completed DWi testing and SMC tests on 19 individual samples.

 

SMC testwork was also completed by JKTech, including breakage parameters a x b, BWi, and autogenous grind/SAG mill specific energy (SCSE). The SMC data show the materials to be soft to very soft in terms of SAG milling characteristics. Test results are provided in Table 10-9.

 

Table 10-9:Summary of SMC Test Results and Additional BMI Data

 

Sample  a x b   SCSE
(kWh/t)
   BWi
(kWh/t)
 
SMC - 1   148.9    6.13    10.9 
SMC – 2   NA    NA    11.9 
SMC – 3   239.9    5.31    7.1 
SMC – 4   106.8    6.89    8.5 
SMC – 5   203.5    5.56    6.8 
SMC – 6   272.7    4.71    5.4 
SMC – 7   629.3    3.98    12.5 
SMC – 8   301.8    5.09    11.7 
SMC – 9   220.5    5.11    8.2 
SMC – 10   180.2    5.77    6.4 
SMC – 11   143.8    6.25    10.8 
SMC – 12   150.7    6.15    11.4 
SMC – 13   98.8    7.07    7.6 
SMC – 14   115.2    6.68    9.7 
SMC – 15   182.5    5.77    9.0 
SMC - 16   71.6    8.21    9.9 
SMC – 17   86.2    7.27    10.5 
SMC – 18   94.2    7.26    10.3 
SMC – 19   169.3    5.83    8.4 
Average Value   189.8    6.05    - 

  
Arctic ProjectPage 141
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

10.3.5Flotation Testwork

 

The predictive metallurgical results for the Arctic Project are based on locked cycle flotation testwork which mirrors the performance of an operational plant and accounts for circulating loads and intermediate products. Each research program consisted of a large number of open circuit flotation tests that provided guidance to the selection of operating conditions to be used in locked cycle tests.

 

In 2012, SGS conducted bench-scale flotation testwork to investigate the recovery of copper, lead, zinc, and associated precious metals using bulk copper-lead flotation and zinc flotation, followed by copper and lead separation. Four wide-ranging composite samples were tested for rougher flotation kinetics, cleaner efficiency, and copper and lead separation flotation efficiency. All of the testwork used a phased approach to completing testwork, with a preliminary phase of flotation testwork generating a bulk copper-lead concentrate and a final zinc concentrate. The bulk copper-lead concentrate was typically used in a second phase of testing, which was focused on separation of copper and lead minerals into copper and lead concentrates. The second phase of testwork typically also involved open-circuit flotation tests and locked cycle tests.

 

All flotation testwork either at SGS or ALS Metallurgy had the same froth characteristics.

 

The froth product is typically light in density and can require extensive flotation time. Very high talc recoveries are required to protect the lead concentrate from contamination as the lead concentrate is the destination for mis-reporting talc. Talc levels in test samples ranged from 0.0 to 40% talc on a weight basis, the LOM average for talc is approximately 5.1%.

 

The ratio of copper to lead is approximately four in the feed samples tested and within the Mineral Reserve estimates. This copper and lead concentrate is readily upgraded to provide feed to a copper and lead separation circuit. This froth is heavy and flotation rates for copper and lead are considered fast. In all copper and lead flotation, Cytec reagent 3418A was used as a copper and lead collector.

 

Zinc flotation follows both talc flotation and copper/lead bulk flotation. Zinc is depressed through both stages of talc and copper/lead flotation with the use of zinc sulphate and cyanide. Zinc minerals are activated with the addition of copper sulphate and a xanthate-based collector.

 

Zinc flotation is relatively fast, and froths are generally heavily laden with mineral.

 

The separation of copper and lead is completed using a high-grade concentrate of copper and lead minerals. The basis of the copper and lead separation is the depression of copper minerals using cyanide to render the copper minerals hydrophilic.

 

Locked cycle test results form the basis of metallurgical predictions for the Arctic project and are reported within Table 10-13 for the SGS testwork program and within Table 10-13 for the ALS Metallurgy testwork program.

 

The SGS testwork produced similar metallurgical performances among the composite samples tested and results were consistent with expectations outlined in the various mineralogical examinations and preliminary testwork results. Further optimization testwork would likely have improved the flotation performance of the composite sample for Zone 1 & 2 (LCT6), sample availability was limited for this composite.

 

The SGS flotation testwork points to high recoveries of copper and lead to a bulk concentrate of copper and lead which would be subsequently separated. Copper recoveries were in the range of 90 to 92%. Zinc recoveries were typically in the range of 89 to 92%. The majority of misreporting of copper was to the zinc concentrate and the majority of mis-reporting zinc was to the copper-lead concentrate. Ongoing optimization of the flotation process will likely reduce the misreporting of metals, through changes in reagent additions, grind size optimization and concentrate mass recovery.

  
Arctic ProjectPage 142
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Flotation testwork conducted in 2017 at ALS Metallurgy, was focused on a detailed evaluation of the performance of a copper and lead separation process and included open circuit flotation tests and locked cycle flotation testing of the copper-lead separation process.

 

A master composite was made from 14 variability samples from the deposit. Locked cycle testing for this composite was completed to provide a comparison with the SGS test results.

 

A summary of the locked cycle test results for both the SGS and ALS Metallurgy test programs in contained in Table 10-10.

 

Table 10-10:Summary of Locked Cycle Recovery Data for Composite Sample Testing

 

   Recovery to Bulk Cu/Pb Concentrate or Zinc Concentrate 
Sample  Cu1
(%)
   Pb1
(%)
   Zn2
(%)
   Au1
(g/t)
   Ag1
(g/t)
 
                     
SGS Burnaby 2012
Zone 3   92.5    92.6    93.0    77.6    85.9 
Zone 5   91.3    92.0    89.3    70.9    84.2 
Zone 3&5   91.7    92.3    91.6    75.8    85.0 
Zone 1&2   84.2    94.0    85.7    79.7    84.2 
ALS Metallurgy 2017 
Master Comp.   94.1    88.7    87.8    74.4    85.4 

 

Notes:

 

1.Represents recovery to a bulk concentrate prior to Cu/Pb separation.
2.Represents recovery to a final zinc concentrate.

 

Locked cycle test results for the ALS Metallurgy master composite are contained in Table 10-10 and reports results for the production of a bulk copper-lead concentrate and a zinc concentrate. Table 10-11 provides the results for the SGS testwork program and Table 10-12 includes the results for the ALS Metallurgy testwork program.

  
Arctic ProjectPage 143
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Table 10-11:Locked Cycle Metallurgical Test Results – SGS Burnaby 2012

 

Test No.             Product              

          Regrind Size          

          80% Passing          

    Weight
%
    Assays   Distribution (%)
  Cu
(%)
  Pb
(%)
  Zn
(%)
  Au
(g/t)
  Ag
(g/t)
  S
(%)
  Cu   Pb   Zn   Au   Ag   S

Zone 3 

LCT-2

Talc Concentrate Cu/Pb Rougher Concentrate: 43 µm;
Zn Rougher Concentrate: 41 µm
1.6   2.39   2.44   4.05   0.51   105.0   9.97   0.4   0.8   0.3   0.4   0.8   0.2
Cu/Pb Cleaner 2 Conc. 12.9 24.7 12.4 3.61 4.73 506 30.5 92.5 92.6 5.5 77.6 85.9 15.4
Zn Cleaner 2 Concentrate 12.9 1.02 0.38 61.4 0.40 41.7 32.9 3.8 2.8 93.0 6.5 7.1 16.5
Zn Cleaner 1 Sc. Tailings 5.9 0.85 0.33 0.86 0.97 35.0 38.7 1.5 1.1 0.6 7.3 2.7 9.0
Zn Rougher Tailings 66.7 0.10 0.07 0.09 0.10 4.01 22.5 1.9 2.7 0.7 8.3 3.5 58.9
Feed 100.0 3.42 1.71 8.43 0.78 75.3 25.4 100.0 100.0 100.0 100.0 100.0 100.0

Zone 5 

LCT-3

Talc Concentrate Cu/Pb Rougher Concentrate: 36 µm;
Zn Rougher Concentrate: 35 µm
1.3 7.15 3.71 2.46 1.22 187.0 13.7 1.2 1.2 0.2 0.3 1.4 0.3
Cu/Pb Cleaner 2 Conc. 9.9 23.8 12.9 5.04 11.2 499 31.5 91.3 92.0 9.1 70.9 84.2 14.7
Zn Cleaner 2 Concentrate 8.3 0.91 0.56 59.1 0.55 46.4 30.5 2.9 3.4 89.3 2.9 6.6 11.9
Zn Cleaner 1 Sc. Tailings 7.1 0.80 0.28 0.56 4.55 30.0 32.4 2.2 1.4 0.7 20.5 3.6 10.7
Zn Rougher Tailings 73.4 0.09 0.04 0.05 0.11 3.38 18.1 2.4 2.0 0.7 5.3 4.2 62.4
Feed 100.0 2.56 1.37 5.47 1.55 58.2 21.1 100.0 100.0 100.0 100.0 100.0 100.0

Zone 3 & 5 

LCT 4

Talc Concentrate Cu/Pb Rougher Concentrate: 45 µm;
Zn Rougher Concentrate: 23 µm
7.3 0.72 0.38 1.37 0.11 17.6 3.01 0.4 0.6 0.4 0.3 0.6 0.3
Cu/Pb Cleaner 2 Conc. 16.0 25.3 9.25 3.13 4.28 408 29.4 91.7 92.3 6.4 73.8 85.0 21.3
Zn Cleaner 2 Concentrate 11.8 1.78 0.39 60.9 0.48 50.7 32.5 4.8 2.9 91.6 6.1 7.8 17.4
Zn Cleaner 1 Sc. Tailings 4.8 1.15 0.38 1.09 2.6 39.8 27.1 1.3 1.1 0.7 13.5 2.5 5.9
Zn Rougher Tailings 60.2 0.14 0.08 0.13 0.1 5.19 20.2 1.9 3.2 1 6.3 4.1 55.1
Feed 100.0 4.41 1.6 7.85 0.93 76.6 22.1 100 100 100 100 100 100

Zone 1 & 2 

LCT-6

Talc Concentrate Cu/Pb Rougher Concentrate: 62 µm;
Zn Rougher Concentrate: 55 µm
4.8 0.67 0.34 0.90 0.40 13.9 1.88 0.4 0.6 0.4 0.8 0.4 0.3
Cu/Pb Cleaner 2 Conc. 9.5 23.7 9.54 5.12 6.65 481 30.2 84.2 94.0 14.3 79.7 84.2 32.5
Zn Cleaner 2 Concentrate 6.4 5.84 0.49 44.5 0.91 101.5 32.8 14.0 3.2 83.7 7.4 12.0 23.9
Zn Cleaner 1 Sc. Tailings 7.4 0.22 0.06 0.17 0.91 12.3 19.6 0.6 0.5 0.4 8.4 1.7 16.4
Zn Rougher Tailings 71.8 0.03 0.02 0.06 0.04 1.34 3.30 0.8 1.7 1.2 3.7 1.8 26.8
Feed 100.0 2.69 0.97 3.42 0.80 54.6 8.8 100.0 100.0 100.0 100.0 100.0 100.0
                                                                                           

Table 10-12:Locked Cycle Metallurgical Test Results – ALS Metallurgy 2017

 

Test No.                    Product                      Regrind Size 80% Passing     Weight %     Assays   Distribution (%)
  Cu
(%)
    Pb
(%)
    Zn
(%)
    Au
(g/t)
    Ag
(g/t)
    S
(%)
    Cu     Pb     Zn     Au     Ag   S

Zone 3

LCT-2

Talc Concentrate Cu/Pb Rougher Concentrate: 43 µm;
Zn Rougher Concentrate: 41 µm
1.6 2.39 2.44 4.05 0.51 105.0 9.97 0.4 0.8 0.3 0.4 0.8 0.2
Cu/Pb Cleaner 2 Conc. 12.9 24.7 12.4 3.61 4.73 506 30.5 92.5 92.6 5.5 77.6 85.9 15.4
Zn Cleaner 2 Concentrate 12.9 1.02 0.38 61.4 0.40 41.7 32.9 3.8 2.8 93.0 6.5 7.1 16.5
Zn Cleaner 1 Sc. Tailings 5.9 0.85 0.33 0.86 0.97 35.0 38.7 1.5 1.1 0.6 7.3 2.7 9.0
Zn Rougher Tailings 66.7 0.10 0.07 0.09 0.10 4.01 22.5 1.9 2.7 0.7 8.3 3.5 58.9
Feed 100.0 3.42 1.71 8.43 0.78 75.3 25.4 100.0 100.0 100.0 100.0 100.0 100.0

  
Arctic ProjectPage 144
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

10.3.6Copper/Lead Separation Testwork

 

SGS performed preliminary open-circuit copper and lead separation tests on the bulk copper-lead concentrates produced from the locked cycle tests in open circuit flotation tests. Sodium cyanide was used to suppress copper minerals; 3418A was used as the lead collector and lime was added to adjust the pulp pH to 10. Table 10-13 summarizes the separation test results. These results were obtained using small concentrate samples of approximately 200 g following the production of bulk concentrates in locked cycle testwork. These results also indicated that the separation of copper and lead was feasible using depression of copper and the flotation of lead minerals. Lead concentrate grades as high as 60% lead were obtained in these preliminary open-circuit tests at SGS and rougher flotation recoveries for lead were observed in the range of 88 to 95%.

 

Additional testwork to provide detailed estimates of the performance of the copper and lead flotation process was conducted at ALS Metallurgy. Approximately 50 kg of bulk copper and lead concentrate was produced in a pilot plant program with the specific objective of completing detailed copper and lead separation testwork. The separation testwork performed very well, however, lower than expected lead concentrate grades were obtained due to talc contamination of the final lead concentrate. This contamination was due to non-optimal talc flotation conditions within the pilot plant.

 

Results for two locked cycle tests using the pilot plant bulk concentrate are shown in Table 10-14. Recovery of lead to a final concentrate was consistent at 88% of the lead contained in the bulk concentrate. Recovery of copper to a final concentrate was consistent at 97.4% of the copper contained in a bulk concentrate.

  
Arctic ProjectPage 145
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Table 10-13:SGS Burnaby Open Circuit Copper and Lead Separation Test Results

 

Test             Product               Weight
%
    Assays   Distribution (%)
  Cu
(%)
    Pb
(%)
    Zn
(%)
    Ag
(g/t)
    Au
(g/t)
    S
(%)
    Cu     Pb     Zn     Ag     Au   S
Zone 3 & 5
Cu/Pb Separation Feed from LCT-4
(Cycle 2)
Pb 2nd Cleaner Concentrate 8.2 5.99 41.0 2.02 2,330 18.9 13.1 1.9 37.0 6.0 44.7 35.9 3.4
Pb 1st Cleaner Concentrate 22 6.87 37.5 4.34 1,665 13.6 20.6 5.9 90.8 34.8 85.7 69.5 14.3
Pb Rougher Concentrate 37.7 16.4 23.0 3.43 1,033 9.17 26.2 24.1 95.5 47.4 91.3 80.3 31.4
Pb Rougher Tailings (Cu Concentrate) 62.3 31.3 0.65 2.31 59 1.36 34.7 75.9 4.5 52.6 8.7 19.7 68.6
Cu/Pb 2nd Cleaner Concentrate (Head) - 25.7 9.07 2.73 4.27 4.31 31.5 - - - - - -
Zone 3
Cu/Pb Separation from Open Circuit Test (Test F25)
Pb 2nd Cleaner Concentrate 2.1 2.22 58.8 5.58 1,622 0.3 20.8 1.4 74.9 1.4 44.2 1.0 1.8
Pb 1st Cleaner Concentrate 2.9 4.51 48.3 6.94 1,369 0.5 24.1 3.8 83.8 2.4 50.9 2.0 2.8
Pb Rougher Concentrate 4.3 12.4 33.6 6.54 1,026 1.05 26.9 15.3 86.0 3.3 56.3 6.6 4.6
Pb Rougher Tailings (Cu Concentrate) 8.3 31.5 0.29 4.33 231 5.24 33.3 75.1 1.4 4.2 24.5 63.9 11.0
Cu/Pb 2nd Cleaner Concentrate (Head) 12.6 25.0 11.6 5.08 502 3.81 31.1 90.4 87.4 7.5 80.8 70.5 15.5
Zone 5
Cu/Pb Separation Feed from LCT-5
(Cycle 2)
Pb 2nd Cleaner Concentrate 6.6 2.42 69.0 2.68 1,230 1.27 15.8 0.6 41.1 3 17.2 1.8 3.3
Pb 1st Cleaner Concentrate 15.2 3.78 57.6 4.18 993 1.92 20.5 2.3 78.8 11.5 31.9 6.1 9.8
Pb Rougher Concentrate 25.5 10.3 40.3 4.82 778 6.31 25.1 10.5 92.4 22.1 41.9 33.6 20.1
Pb Rougher Tailings (Cu Concentrate) 74.5 30.0 1.13 5.79 369 4.26 34.1 89.5 7.58 77.9 58.1 66.4 79.9
Cu/Pb 2nd Cleaner Concentrate (Head) - 25.0 11.1 5.54 473 4.78 31.8 100.0 100.0 100.0 100.0 100.0 100.0
Zone 1 & 2
Cu/Pb Separation Feed from
LCT-6 (Cycle 2)
Pb 2nd Cleaner Concentrate 7.59 2.4 57.3 5.59 0.54 1,313 15.1 0.76 47.1 8.1 0.7 20.1 3.78
Pb 1st Cleaner Concentrate 16.4 4.38 45.3 7.96 0.77 1,038 19.9 2.98 80.5 24.9 2.2 34.4 10.8
Pb Rougher Concentrate 23.6 9.6 34.3 7.19 1.13 849 22.9 9.4 87.7 32.3 4.6 40.4 17.8
Pb Rougher Tailings (Cu Concentrate) 76.4 28.6 1.49 4.64 7.14 386 32.6 90.6 12.34 67.7 95.4 59.6 82.2
Cu/Pb 2nd Cleaner Concentrate (Head) - 24.1 9.23 5.24 5.72 495 30.3 100.0 100.0 100.0 100.0 100.0 100.0

 

Table 10-14:ALS Metallurgy Locked Cycle Testing of Copper-Lead Separation Process

 

Test             Product               Weight
%
    Assays   Distribution (%)
  Cu
(%)
    Pb
(%)
    Zn
(%)
    Ag
(g/t)
    Au
(g/t)
    Cu     Pb     Zn     Ag   Au
Test 33
Bulk Conc. From Pilot Plant Operation
Pb 2nd Cleaner Concentrate (Pb Conc.) 22.1 2.68 24.2 1.35 960 6.9 2.6 87.3 11.4 70.5 85.1
Pb 1st Cleaner Tail 11.3 25.8 1.64 2.08 138 0.39 12.9 3.0 9.0 5.2 2.5
Pb Rougher Tail 66.6 28.8 0.89 3.11 110 0.33 84.5 9.7 79.5 24.3 12.5
Combined Tailings (Cu Concentrate) 77.9 28.3 1.00 2.96 144 0.34 97.4 12.7 88.6 29.5 14.9
Bulk Cleaner Concentrate (Feed) - 22.7 6.13 2.61 301 1.79 100.0 100.0 100.0 100.0 100.0
Test 34
Bulk Conc. From Pilot Plant Operation
Pb 2nd Cleaner Concentrate (Pb Conc.) 21.9 2.75 23.3 1.29 906 7.33 2.6 86.0 10.8 69.5 85.3
Pb 1st Cleaner Tail 11.2 26.8 1.76 2.02 132 0.44 12.9 3.3 8.7 5.2 2.6
Pb Rougher Tail 66.9 29.4 0.95 3.14 106 0.34 84.5 10.7 80.5 25.3 12.1
Combined Tailings (Cu Concentrate) 78.1 29.4 1.06 2.98 111 0.35 97.4 14.0 89.2 30.5 14.7
Bulk Cleaner Concentrate (Feed) - 23.3 5.93 2.61 285 1.88 100.0 100.0 100.0 100.0 100.0

  
Arctic ProjectPage 146
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

In order to further evaluate the issue of talc contamination of the lead concentrate that was observed in some of the ALS Metallurgy testwork, additional lead concentrate production testwork was undertaken using a variety of samples with moderate to very high talc contents. This testwork was completed as open-circuit tests and involved the production of a bulk concentrate and the subsequent separation of the copper and lead minerals from the bulk concentrate. The objective of this testwork was to demonstrate that when talc recovery was optimized or maximized, the lead concentrate grade target could be readily achieved. These test results are summarized in Table 10-15. The open circuit tests included operating the talc flotation process until no visible talc was being recovered in the talc flotation stage. The results of the locked cycle separation testwork where lead concentrate grades were observed to be low are included in the table. Also shown is the value of the lead concentrate carried in the predictive metallurgical balance for the Arctic Project.

 

Table 10-15:Summary of Lead Concentrate Grades for Various Talc Grades in Feed

 

   Talc Content   Lead Conc Grade   Copper Conc. Grade 
Sample  %   % Pb   % Cu 
Pilot Plant Comp.   12.7    23.5    29.4 
5567-04(test 4)   18.4    61.1    32.3 
5567-14(test 5)   0    61.5    30.2 
5567-1(test 6)   8.5    46.9    30.8 
5567-5(test 7)   30.0    47.1    32.4 
5567-7(test 8)   10.5    48.2    29.2 
5567-9(test 9)   17.7    63.0    31.4 
5567-14(test 10)   0    56.3    29.1 
5567-5(test 11)   31.5    49.6    31.8 
5567-9(test 12)   19.0    60.2    31.0 
LOM Prediction   5.1    55.0    30.3 

 

The lead concentrate grades observed in the testwork summarized in indicates the ability to manage lead concentrate grades by virtue of the efficiency of the talc removal process. This testwork also indicates that lead concentrate quality can be achieved when talc feed grades are several times higher than the LOM estimated talc grade.

 

Table 10-16 provides descriptions of the key metallurgical parameters for the operation of the proposed recovery and upgrading of base and precious metals. These have been estimated from numerous tests and will be modulated during the operation as feed grades and metal ratios dictate.

  
Arctic ProjectPage 147
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Table 10-16:Summary of Flotation Reagent and Grind Size Objectives

 

Process Stage Parameter Comment
Flotation Feed    
Primary Grind Size P80 70 µm
Zinc Depressant ZnSO4 200/100 g/t
Zinc Depressant NaCN 100 g/t
     
Talc Flotation    
Frothers MIBC 10 – 40 g/t
     
Bulk Cu/Pb Flotation    
Flotation Collector 3418A 25-40 g/t
Frother MIBC 5 – 10 g/t
Re-grind Size P80 40 µm
     
Zinc Flotation    
Zinc Activator CuSO4 100-200 g/t
Zinc Collector SIPX 10 - 50 g/t
Re-grind Size P80 40 µm
     
Cu/Pb Separation    
Copper Depressant NaCN 60 - 120 g/t
Lead Collector 3418A 10 g/t

 

Note:Expected Concentrate Quality.

 

ICP assays were conducted on the copper and lead concentrates produced from the locked cycle tests at ALS Metallurgy and the zinc concentrate from the locked cycle tests at SGS. The samples are thought to represent the expected concentrate quality. The main impurity elements are shown in Table 10-17.

 

The results indicated that key penalty elements, as well as precious metals are typically concentrated into a lead concentrate, leaving the copper concentrate of higher-than-expected quality.

 

Table 10-17:Summary of Lead Concentrate Quality

 

   Pb   Zn   Cu   Au   Ag   As   Sb   Bi   F 
Lead Conc.  %   %   %   g/t   g/t   g/t   g/t   g/t   g/t 
Average Value   55.0*   1.8    6.9    37.3*   2805*   2128    1375    3876    3260 
Sample Max   -    2.83    -    -    -    4400    5370    5140    5900 
Sample Min   -    0.74    -    -    -    125    32    3270    160 

 

* Reported to be consistent with predictive balance.

  
Arctic ProjectPage 148
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

The issue of fluorine in the lead concentrate can be an issue for smelters. The level of fluorine in lead concentrates produced in laboratory tests, has been shown to be the result of small volumes of talc mineral that escape the talc pre-float circuit and will report with the lead concentrates. Talc levels and ultimately fluorine levels will be managed by optimization of the talc pre-float circuit, talc and fluorine will be effectively removed to ensure the quality of the lead concentrate. It is recommended that a value of 1,500 g/t F be used in marketing evaluations of the lead concentrate. Bismuth may also be an element that will be an issue with the lead concentrates.

 

Precious metal deportment into the lead concentrate is very high and should benefit the payable levels of precious metals at a smelter.

 

Table 10-18 provides the key features expected in the copper concentrate.

 

Table 10-18:Summary of Copper Concentrate Quality

 

   Cu   Zn   Pb   Au   Ag   As   Sb   Bi   F 
Copper Conc.  %   %   %   g/t   g/t   g/t   g/t   g/t   g/t 
Average Value   30.3*   1.6    0.70    0.8*   138*   1996    1163    175    246 
Sample Max   -    2.98    1.52    -    -    3350    1675    324    330 
Sample Min   -    0.87    0.53    -    -    102    264    115    180 

 

* Reported to be consistent with predictive balance.

 

Copper concentrates are shown to be of high quality with arsenic levels somewhat elevated, but likely below penalty levels. Sulphur levels in copper concentrates are consistent with the mineralization being chalcopyrite at approximately 30–32% sulphur.

 

Table 10-19 shows the predicted key features of the zinc concentrate.

 

Table 10-19:Summary of Zinc Concentrate Quality

 

   Zn   Cu   Pb   Au   Ag   Fe   As   Sb   Cd   Bi   F 
Zinc Conc.  %   %   %   g/t   g/t   %   g/t   g/t   g/t   g/t   g/t 
Average Val.   59.2*   1.3    0.25    0.53*   24.5*   5.47    966    115    3514    60    100 
Sample Max.   -    2.98    0.06    -    -    12.4    7000    570    4000    351    - 
Sample Min.   -    0.87    0.22    -    -    1.93    100    16    2900    11    - 

 

* Reported to be consistent with predictive balance.

 

Zinc concentrates are high grade but have elevated levels of cadmium that may incur economic penalties. Average iron content for the zinc concentrate is considered very good and further optimization of the rejection of pyrite may further reduce these reported iron levels.

  
Arctic ProjectPage 149
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

10.4Mineralogical and Metallurgical Testwork – 2021 to 2022

 

10.4.1Introduction

 

In 2021, ALS Metallurgy conducted a test program on several composites constructed in previous Arctic test programs, followed by testing on composites constructed from the drill core samples generated from the 2021 drill program. The objectives of the test program were the characterization of talc in the composites, and determination of the talc distribution to the flotation flowsheet streams. Most of the flotation testing was completed with the preflotation circuit only to establish talc performance.

 

The generation of final tails for dewatering testing by the Metso Group was completed using a flowsheet which included pre-flotation, bulk, and zinc circuits. Copper-lead separation tests were also completed using the bulk concentrate produced from the tails generation test.

 

The Metso group prepared simulations for different talc pre-flotation circuit options using the ALS Metallurgy testwork results. The models were used to simulate different scenarios and to select the best circuit configuration.

 

In 2022, ALS Metallurgy conducted testwork to investigate bulk and sequential flotation flowsheets with composites formed from two parent composites, and then select a flowsheet for a geometallurgical evaluation through testing with variability samples.

 

The 2022 metallurgical samples were selected using Cancha geometallurgy software, which has unique geostatistical functions to ensure that samples are representative and combined with visualization of drill logs improved sample selection from the Arctic deposit. This software will be utilized along with a review of the material composition and key properties to select representative samples and analyze the metallurgical test results in future testwork programs.

 

The flowsheet development testwork investigated the effect of various process conditions on copper, lead and zinc recovery using copper-lead bulk flotation and zinc flotation followed by copper and lead separation. The testwork demonstrated that the mineralization was amenable to either a bulk flowsheet followed by copper-lead separation, or a sequential flowsheet, both following a pre-flotation stage to remove talc. In addition, Jameson cell cleaner flotation tests were conducted on a single parent composite to provide data to support the sizing and selection of the Jameson cell technology.

 

SGS conducted SAG Power Index (SPI®) testing on 15 samples to expand the comminution dataset and investigate the impact of friable ore types on the plant throughput.

 

Based on economic analysis comparing the bulk and sequential circuit, the bulk circuit flowsheet was selected for the variability testing. Many of the variability samples measured much higher copper, lead, and/or zinc feed grades than the composites tested in the flowsheet development phase. The variability sample selection were not intended to reflect sequences of the mine plan, but instead to represent discrete lithology types from which the results of the flotation testing would be used as inputs for recovery and grade models for the deposit.

 

Ore characterization and process mineralogical examination was conducted on all the flowsheet development and variability samples. The talc content was considered during sample selection to avoid mis-representing the talc content of future samples.

  
Arctic ProjectPage 150
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

10.4.2Test Samples

 

The pre-flotation flow sheet development test program was carried out on a number of composites constructed in previous Arctic test programs, followed by testing on composites constructed with drill core samples received under this test program.

 

Table 10-20 summarizes the assay results for the composites constructed in previous Arctic test programs KM5000 and KM5718, as well as the composites formed in this metallurgical test program.

 

Table 10-20:ALS Head Grades – Pre-Flotation Samples – 2021

 

   Chemical Content 
Composite  Cu (%)    Pb (%)    Zn (%)    Fe (%)    S (%)    Ag (g/t)    Au (g/t)    Mg (%) 
Composite 13 (KM5000)   1.98    0.30    1.48    6.20    6.25    38    0.26    9.14 
PP Composite 1 (KM5000)   2.92    0.86    4.66    10.8    13.8    41    0.56    5.78 
Zone 5 (KM5718)   2.45    1.35    5.59    15.9    22.7    67    1.24    0.61 
Zone 3-5 (KM5718)   4.14    1.55    7.80    16.5    24.0    86    0.99    2.58 
Master Composite 1B (KM5718)   3.16    1.12    5.52    14.0    16.6    48    0.58    5.22 
Constructed under KM6442
Master Composite 2   3.67    1.30    6.50    12.9    19.1    65    0.84    4.15 
HT 1   4.40    0.80    4.79    10.2    14.0    42    0.12    8.54 
HS 2   0.91    0.07    0.38    5.0    3.51    5    0.03    3.57 
HT 2   0.25    0.04    0.39    1.8    0.67    3    0.01    9.11 
FT 1   2.11    0.60    2.72    7.3    9.19    36    0.63    4.28 

 

Initially, two parent composites were constructed for the flowsheet development testing: the Mineralized Composite and Talc Composite. The Mineralized Composite contained about 1.5% talc, while the Talc Composite contained about 55% talc. From these two composites, a range of blends were constructed to generate samples of various talc grades for testing.

 

Table 10-21 summarizes the flow sheet development blends and their calculated talc content.

 

Table 10-21:ALS Flowsheet Development Head Composites – 2021

 

   Proportion of Composite    
Blend Composite  Mineralized Composite   Talc Composite   Talc Content (%) 
Very Low Talc   97    3    3.2 
Low Talc   93    7    5.1 
Average Talc   90    10    6.9 
High Talc   87    13    8.7 

  
Arctic ProjectPage 151
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

   Proportion of Composite     
Blend Composite  Mineralized Composite   Talc Composite   Talc Content (%) 
Very High Talc   83    17    10.5 
11% Talc   82    18    11.4 
15% Talc   74    26    15.5 

 

As would be expected, head assays measured for each of the blend composites were relative to the proportions of each of the two parent composites. A summary of key head assays for each blend is shown in Table 10-22.

 

The Talc Composite contained lower metal contents of Cu, Pb, Zn, Ag and Au, as compared to the mineralized (Pure Min) composite. As a result, samples with increased talc content were also of lower head grade, both of which would be expected to lead to poorer metallurgical response.

 

Some sulphate minerals, as well as organic carbon, were measured in the Pure Min Composite; both were almost negligible in the Talc Composite. The presence of sulphate minerals indicates that a portion of the total sulphur likely would not be recovered via sulphide flotation. Organic carbon, like talc, is usually naturally hydrophobic, so it would be expected to report to the pre-flotation concentrate with the talc.

 

Table 10-22: ALS Flowsheet Development Composites Head Assays – 2021

 

   Chemical Content 
Composite  Cu (%)    Pb (%)    Zn (%)    Fe (%)    S (%)    S(s) (%)   S(SO4) (%)    Ag (g/t)    Au (g/t)    C (%)    TOC    Mg (%) 
Pure min   2.31    0.84    3.57    8.0    10.9    9.82    1.03    39    0.47    0.59    0.14    3.12 
V. Low Talc   2.12    0.78    3.20    7.7    10.2              34    0.47              3.61 
Low Talc   2.17    0.78    3.21    7.6    10.2              35    0.42              4.05 
Avg Talc   2.15    0.75    3.09    7.2    9.54              35    0.42              4.52 
High Talc   2.11    0.76    3.07    7.1    9.44              36    0.44              4.91 
V. High Talc   1.97    0.67    2.78    6.6    8.49              32    0.42              5.30 
11% Talc   1.98    0.66    2.73    6.6    8.74              33    0.32              5.49 
15% Talc   1.81    0.60    2.56    6.1    8.14              32    0.40              6.16 
Pure Talc   0.93    0.09    0.55    2.0    1.51    1.49    0.03    14    0.25    0.43    0.04    15.7 

 

The drill holes from the most recent 2021 Arctic exploration drilling program assessed to construct geometallurgical samples. The length of the geometallurgical sample was taken as short as possible to ensure that the mineralogy and lithology rock texture was consistent throughput the sample.

 

The 2022 variability test program used a total of 34 geometallurgical samples constructed from 11 drill holes and are summarized in Table 10-23. The drill cores were stored in a freezer to ensure sample degradation and oxidation of sulphide minerals did not occur.

  
Arctic ProjectPage 152
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Table 10-23: ALS Variability Sample Details – 2022

 

Sample ID  Drill Hole  From   To   Length (m)   Zone   Lithology 
ARC-003  AR21-0174   86.9    92.1    5.2    Zone 5    MS 
ARC-004  AR21-0174   92.9    95.1    2.2    Zone 5    MS 
ARC-005  AR21-0176   128    129.4    1.4    Zone 4    SMS 
ARC-006  AR21-0176   129.4    134.4    5    Zone 4    ChTS 
ARC-007  AR21-0176   134.4    138.3    3.9    Zone 3    MS 
ARC-008  AR21-0176   138.3    147.9    9.6    Zone 3    MS 
ARC-010  AR21-0176   165.6    168.7    3.1    Zone 1    QMS 
ARC-017  AR21-0177   94.6    99.8    5.2    Zone 5    GS 
ARC-024  AR21-0182   126.6    127.7    1.1    Zone 5    MS 
ARC-025  AR21-0182   127.7    130.9    3.2    Zone 5    ChTS 
ARC-039  AR21-0182   158.6    162.4    3.8    Zone 3    MS 
ARC-044  AR21-0182   176.3    178.6    2.3    Zone 3    SMS 
ARC-050  AR21-0182   205.1    210.2    5.1    Zone 1    SMS 
ARC-051  AR21-0185   123.5    125.4    1.9    Zone 5    MS 
ARC-052  AR21-0187   85.2    89.7    4.5    Zone 5    MS 
ARC-054  AR21-0181   119.7    121.8    2.1    Zone 5    SMS 
ARC-055  AR21-0181   131.7    134.6    2.9    Zone 4    SMS 
ARC-056  AR21-0181   134.6    136.9    2.3    Zone 4    MS 
ARC-057  AR21-0181   136.9    140.4    3.5    Zone 4    TS 
ARC-058  AR21-0181   140.4    144.8    4.4    Zone 4    MS 
ARC-059  AR21-0181   147.8    149.4    1.6    Zone 4    SMS 
ARC-062  AR21-0181   159.8    163.9    4.1    Zone 3    MS 
ARC-063  AR21-0181   168.3    169.7    1.4    Zone 3    SMS 
ARC-064  AR21-0181   169.7    173.1    3.4    Zone 3    TS 
ARC-068  AR21-0181   177.1    180.4    3.3    Zone 3    SMS 
ARC-069  AR21-0181   187.1    191.1    4    Zone 2    MS 
ARC-072  AR21-0181   203.3    209.1    5.8    Zone 1    MS 
ARC-080  AR21-0184   136.3    139.3    3    Zone 5    QMS 
ARC-084  AR21-0188   222    224.4    2.4    Zone 2    MS 
ARC-086  AR21-0190   141.9    145.1    3.2    Zone 4    SMS 
ARC-087  AR21-0190   145.1    148.7    3.6    Zone 4    MS 
ARC-092  AR21-0190   186.8    189.1    2.3    Zone 2.5    MS 

  
Arctic ProjectPage 153
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Sample ID  Drill Hole  From   To   Length (m)   Zone   Lithology 
ARC-098  AR21-0190   217.9    221.2    3.3    Zone 1    CHS 
ARC-099  AR21-0189   50.4    61.54    11.14    Zone 5    MS 

 

The head grades of the composites from the 2022 ALS variability testwork program are shown in Table 10-24.

 

Many of the variability samples measured much higher copper, lead, and/or zinc feed grades than the composites tested in the flowsheet development phase. The Variability sample selection were not intended to reflect sequences of the mine plan, but instead to represent discrete lithology types from which the results of the flotation testing would be used as inputs for recovery and grade models for the deposit.

 

Table 10-24:ALS Variability Samples Head Assays – 2022

 

   Chemical Content 
Sample ID    Cu (%)    Pb (%)    Zn (%)    Fe (%)    S (%)    Ag (g/t)    Au (g/t)    Sb (g/t)    Barite (%)    Talc (%) 
ARC-003    6.4    2.3    10.0    11.8    24.2    81    1.03    309    33.4    0.1 
ARC-004    6.1    2.0    8.9    15.1    23.9    61    0.53    85    6.1    0.1 
ARC-005    8.1    1.0    4.3    7.2    12.4    127    0.99    315    9.0    11.9 
ARC-006    1.1    0.1    0.1    1.9    1.6    18    0.38    149    0.1    71.3 
ARC-007    5.9    2.5    12.2    14.4    29.1    140    1.33    450    16.0    2.7 
ARC-008    8.9    2.3    9.5    17.4    26.6    120    1.52    445    18.4    0.1 
ARC-010    1.5    1.3    8.2    5.5    8.4    22    0.07    13    0.1    12.6 
ARC-017    0.6    0.1    0.2    4.6    4.8    4    0.16    44    0.1    0.1 
ARC-024    8.6    2.5    13.8    14.7    28.0    133    1.21    57    9.4    2.6 
ARC-025    0.8    0.2    0.3    2.2    1.5    11    0.24    114    0.1    54.0 
ARC-039    4.6    3.7    14.1    19.4    27.6    110    1.48    648    0.1    0.1 
ARC-044    1.8    0.1    0.1    4.9    5.2    18    0.20    82    0.1    0.2 
ARC-050    3.1    0.2    1.0    9.5    8.8    36    0.38    54    0.1    0.5 
ARC-051    3.7    2.3    13.2    15.8    30.6    70    0.52    31    23.8    0.5 
ARC-052    8.5    2.2    13.0    16.7    28.1    120    1.11    227    7.6    0.8 
ARC-054    4.7    1.3    5.9    14.4    23.0    89    0.34    129    21.2    1.1 
ARC-055    2.8    0.8    6.3    10.3    15.2    67    0.43    23    0.1    21.4 
ARC-056    7.4    0.8    7.2    18.5    25.5    109    0.85    198    0.1    7.9 
ARC-057    1.0    0.1    0.2    2.9    1.8    7    0.07    4    0.1    37.2 
ARC-058    6.0    2.4    13.6    19.6    31.0    110    1.31    412    7.9    0.5 
ARC-059    5.3    0.6    6.6    9.3    13.2    70    0.53    14    0.1    12.6 

  
Arctic ProjectPage 154
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

   Chemical Content – percent or g/tonne 
Sample ID    Cu (%)    Pb (%)    Zn (%)    Fe (%)    S (%)    Ag (g/t)    Au (g/t)    Sb (g/t)    Barite (%)    Talc (%) 
ARC-062    2.2    6.5    17.7    10.2    20.6    55    0.28    95    0.4    1.1 
ARC-063    4.0    0.1    2.1    7.3    8.3    13    0.13    4    0.2    38.8 
ARC-064    0.7    0.0    0.4    1.7    1.3    2    0.02    1    0.1    67.1 
ARC-068    2.3    0.1    1.2    7.1    6.4    22    0.16    140    0.1    0.3 
ARC-069    2.9    1.3    9.2    12.6    23.2    55    0.12    40    19.3    7.6 
ARC-072    4.8    0.5    9.0    18.2    24.8    114    1.14    102    0.1    1.8 
ARC-080    1.2    0.1    0.2    2.6    2.7    22    0.34    82    0.1    3.7 
ARC-084    2.4    0.4    5.3    16.1    24.3    29    0.29    9    0.1    1.6 
ARC-086    3.8    1.0    7.0    11.1    21.4    89    1.60    937    51.3    0.3 
ARC-087    10.3    4.2    13.7    12.5    24.3    171    3.36    578    6.0    0.8 
ARC-092    3.9    0.1    5.1    20.2    31.0    22    0.31    44    0.1    3.2 
ARC-098    1.0    0.0    0.1    2.9    1.5    25    0.06    2    0.1    0.7 
ARC-099    5.8    2.3    11.4    12.6    22.3    92    0.33    57    11.2    0.9 

 

Head characterization was completed by ALS Geochemistry North Vancouver on all 34 variability samples including whole rock analysis by fusion and XRF, and multi-element determinations by ICP, ion chromatography, and Bulk Mineral Analysis with Liberation estimation (BMAL).

 

A total 29 samples were submitted for open circuit flotation tests and nine samples were used in locked cycle flotation tests. Eight samples produced sufficient bulk concentrate mass to undertake copper-lead separation testing.

 

Comminution testing was completed only on selected variability samples to extend the historical testwork dataset which included Bond ball mill work index tests and SPI tests. A Bond rod mill work index and Bond Abrasion test was completed with only three of the variability samples.

 

Shown in Figure 10 4 are the copper and lead grades of the ALS Metallurgy testwork samples compared to the designed plant feed grades. The pre-flotation samples are more representative of the expected mine production due to the lower range of copper and lead grades that are available. There is a strong correlation between copper and zinc grades within the pre-flotation samples. The metallurgical balance shown in Table 10-1 is based on LOM feed grades and is consistent with the LOM data point shown in Figure 10 4.

 

Shown in Figure 10 5 are the copper and zinc grades of the various test samples used in the ALS Metallurgy test program. There is a consistent copper to zinc ratio of approximately 3.5–4.5 within the test samples and the LOM grades are shown to be within the distribution of test samples.

  
Arctic ProjectPage 155
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Figure 10-4: Cu and Pb Test Sample Grades for ALS Metallurgy Test Program

 

 

Source: Ausenco, 2022

 

Figure 10-5: Cu and Zn Test Sample Grades for ALS Metallurgy Test Program

 

 

Source: Ausenco, 2022

  
Arctic ProjectPage 156
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

10.4.3Mineralogical Investigations

 

10.4.3.1Talc Optimization Samples

 

The mineral content and elemental deportment of the composites tested in the metallurgical test program were measured by QEMSCAN using Bulk Mineral Analysis (BMA) protocols as well as by semi-quantitative X-Ray Diffraction (XRD). A summary of the mineral content mineral content is presented in Figure 10 6.

 

The talc content varied widely between the composites. Highest talc content at about 21% was measured for the HT1 (High Talc) sample. A second sample HT2, received with the intention of blending as a high talc sample, measured only about 3% as talc and 47% as chlorite by QEMSCAN and was not utilized for testing in this study. The Master Composite 2, which had been prepared using the KM5718 Master Composite 1B and Zone 3-5 Composite, measured about 8% talc, and the FT1 composite which was utilized to generate a talc pre-flotation concentrates and zinc circuit tails for dewatering testwork measured about 14% talc.

 

Magnesium was distributed amongst a number of minerals for the Arctic deposit which included primarily talc, micas, chlorite, and calcium carbonate minerals dolomite and ankerite. The distribution of magnesium to these minerals varied widely between the composites, so magnesium assays on flotation test products would not accurately reflect talc recoveries.

 

To improve the estimate of talc in the deposit a talc predictive algorithm has been developed by South32. The talc algorithm includes aluminium, calcium, potassium, and magnesium to improve the predictability of talc. The predicted talc assay form each of the individual variability composites were compared with the mineralogical analysis of the head sample. The predictive talc algorithm aligned well with the measured talc content. Understanding that the blending of composites reduces the predictability of the talc in the plant feed, the Arctic Project has considered incorporating the predicted talc and metallurgical performance on each of the mine blocks and then weighing the overall metallurgical performance. Future testwork will investigate blends to validate this approach.

 

Copper was contained primarily as chalcopyrite, although low percentages of bornite, tennantite/enargite, covellite, chalcocite, and bornite were also measured.

  
Arctic ProjectPage 157
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Figure 10-6: Talc Optimization Composites Mineral Content

 

 

Source: ALS Metallurgy, 2021.

 

10.4.3.2Flow Sheet Development Samples

 

Particle Mineral Analysis (PMA) and XRD were conducted on each the Pure Min and Talc Composites. The semi-qualitative XRD data confirmed non-sulphide gangue mineral contents reported in the Particle Mineral Analyses. A summary of pertinent mineral content data is shown in Figure 10 7.

  
Arctic ProjectPage 158
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Figure 10-7: Parent Composite Mineral Content

 

 

Source: ALS Metallurgy, 2021

 

As expected, based on the head assays, the sulphide mineral content for the Pure Min Composite was significantly higher than the Talc Composite. Conversely, the Talc Composite contained very high talc content, about 55%, while the Pure Min Composite only measured about 1.5% talc.

 

Copper was measured mostly in the form of chalcopyrite. However, between around 2 and 8% of the copper was in copper arsenic sulphosalts (enargite/tennantite /tetrahedrite group minerals). These copper arsenic sulphosalts are typically recovered by flotation in a similar manner to other copper sulphide minerals. On this basis, elevated arsenic and/or antimony levels in the copper concentrate would be expected.

  
Arctic ProjectPage 159
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Only a small portion of the magnesium in the Pure Min Composite was present in talc and most of the magnesium was measured as chlorite. In the Talc Composite, just over 70% of the magnesium was measured within talc, with chlorite being the main other magnesium bearing mineral. Mica minerals also contributed a lesser, but still significant component of the magnesium in both composites (7 to 21%). Given the presence of magnesium in minerals other than talc, magnesium is likely not a useful proxy for quantifying talc content across the deposit.

 

Sulphur was measured mostly as sulphide minerals in both samples. However, in the Pure Min Composite, around 11% was measured as sulphate minerals (i.e., barite, calcium sulphate, and jarosite).

 

Spectra collected on the sphalerite in the Pure Min and High Talc parent composites measured between 4 and 5 percent iron within the mineral matrix. The iron content within the zinc concentrates produced from the blend composites would be expected to therefore be at least 4%.

 

10.4.3.3Variability Samples

 

A Bulk Mineral Analysis with Liberation estimation (BMAL) by QEMSCAN was conducted at ALS Metallurgy on each of the variability samples to provide mineral composition and estimates of liberation for key sulphide minerals. A summary of the mineral content data is presented in Figure 10 8.

 

Talc content varied widely between the samples, ranging from less than detection limits to as high as about 71% for ARC-006. The average talc content for the variability samples was about 12% which is four times the LOM talc content of 3%. MgO contents, measured by XRF or whole rock analysis, could be used to make a preliminary estimate of talc content, despite magnesium being contained in minerals other than talc. Samples high in MgO but low in talc could be identified based on higher Al2O3 content greater than 10%. Since talc does not contain aluminium, higher Al2O3 content indicates the presence of other potentially magnesium bearing minerals in important concentrations. X-ray spectra collected from talc from the Pure Min and Talc composites did not identify fluorine within the mineral structure. However, based on a trend between fluorine and talc content, it is possible that there is fluorine within talc at low concentrations.

 

Copper was measured predominantly in the form of chalcopyrite. Copper as copper arsenic sulphosalts enargite/tennantite, and tetrahedrite averaged about 3% and measured as high as 14% for ARC-086. Elevated arsenic and/or antimony levels in the copper concentrate would be expected for feeds with higher percentages of copper in these forms.

 

Magnesium in the variability samples was measured primarily within talc, chlorite, and micas. For ARC-050, about one half of the magnesium was associated with amphibole/pyroxenes and magnesite/siderite. A summary of the magnesium deportment is shown in Figure 10-8. Sulphur was measured mostly as sulphide minerals chalcopyrite, sphalerite, pyrite, and galena. About 51% of the feed mass was measured as barite for ARC-086, and about 33% as barite for ARC-003. Barite would be unlikely to be recovered via sulphide flotation techniques.

  
Arctic ProjectPage 160
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Figure 10-8: Mineral Modal Abundance for Variability Samples

 

 

Source: ALS Metallurgy, 2022

 

Liberations were estimated by QEMSCAN BMAL protocols using sub-samples of grind calibrations for each of the variability samples. The analysis was completed over a wide range of primary grind sizes between 50 and 137µm K80 due to the manner in which the grind calibrations were completed. An initial grind calibration targeting 65µm K80 was completed at 18 minutes for variability samples which measured lower talc content, and at 23 minutes for the samples which measured high talc content. A second grind calibration at 30 or 35 minutes was included for a few samples where sizing’s measured greater than 100µm K80.

 

Copper sulphide mineral liberations, estimated from the QEMCSAN BMAL, averaged about 68% for the variability samples which would be considered moderate to adequate for expected copper recovery in the bulk roughers. About 8% of the copper sulphide minerals on average were estimated to be in binary form with either sphalerite or pyrite, with about 10% of the copper sulphides in binary form with non-sulphide gangue.

  
Arctic ProjectPage 161
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

An average galena liberation off 55% was estimated, but an additional 11% of the galena was estimated to be in binary form with copper sulphides which would also be recoverable in the bulk roughers, and as such the galena liberation would also be considered acceptable for good lead recovery in the bulk roughers. About 11% of the galena was estimated to be in binary form with sphalerite.

  

Average sphalerite liberation was estimated to be 72%. This would be expected to lead to high zinc recovery in the zinc roughers. About 9% of the sphalerite, on average, was estimated to be in binary form with copper sulphide minerals which could be potentially recovered in the bulk roughers, but a percentage of this sphalerite could be returned to the zinc roughers after bulk circuit regrinding.

  

10.4.4Comminution Testwork

 

Comminution testing included Bond ball mill work index tests and SPI tests on several samples; a Bond rod mill work index and Bond Abrasion test was completed with only three of the variability samples.

 

ALS Metallurgy completed Bond ball mill work index tests (BWi) on one set of variability samples with a 150-mesh Tyler closing screen (106µm), and for a second set of samples with a 48-mesh Tyler screen (300µm). Several the samples selected for the Bond work index tests completed with the coarser closing screen measured high talc content (ARC-006, ARC-025, ARC-057, and ARC-064). All variability samples selected for Bond ball mill work index testing with the 150-mesh Tyler screen measured low talc content of 1% or less, except for the ARC-069 composite which measured about 8% talc.

  

The highest Bond ball mill work index recorded for those samples tested was about 21 kWh/t, at the coarser screen sizing, for ARC-006 which measured about 71% talc. The high Bond ball mill work index is likely a result of the resistance to breakage of the talc particles which has been observed in previous test programs with Arctic composites. A Bond ball mill work index of less than 12 kWh/t was measured for most of the variability samples tested which would indicate material that was soft in terms of ball milling.

  

Abrasion test results for the three variability samples submitted for testing ranged between 0.01 and 0.05, which would be considered mildly abrasive.

 

Table 10-25 summarizes the bond work comminution test results.

 

Table 10-25: Bond Ball Mill Work Index and Abrasion Index Test Results

 

    Bond Ball Wi      
Sample ID  

@ 300µm

kWh/t

 

@ 106µm

kWh/t

 

@ 1180µm

kWh/t

  Bond Abrasion  
ARC-006   20.8   -   -   -  
ARC-008   -   8.2   -   -  
ARC-017   9.8   -   11.3   0.049  
ARC-025   11.4   -   -   -  
ARC-039   -   8.6   -   -  
ARC-044   -   17.7   -   -  
ARC-050   -   11.8   -   -  
ARC-052   -   9.0   -   -  

  
Arctic ProjectPage 162
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

    Bond Ball Wi      
Sample ID   @ 300µm
kWh/t
  @ 106µm
kWh/t
  @ 1180µm
kWh/t
  Bond Abrasion  
ARC-057   10.3   -   -   -  
ARC-058   -   8.1   -   -  
ARC-062   -   13.1   -   -  
ARC-064   14.7   -   -   -  
ARC-069   -   8.2   -   -  
ARC-072   -   9.1   6.4   0.034  
ARC-099   5.9   -   4.8   0.014  

  

ALS Metallurgy, in conjunction with SGS Lakefield (SGS) conducted SPI tests on 15 selected variability samples during the testwork program in 2022. The SPI test is considered more reliable when estimating specific energy of soft ores.

 

The SPI data show most materials to be very soft in terms of SAG milling characteristics. Test results are provided in Table 10-26.

 

Table 10-26: Summary of SPI Test Results

 

Sample  

SPI 

(min)

 

Hardness

Percentile

  Category  
ARC-017   35.2   15   Soft  
ARC-025   12.8   3   Very Soft  
ARC-044   25.3   8   Very Soft  
ARC-050   19.5   5   Very Soft  
ARC-056   14.0   3   Very Soft  
ARC-057   13.8   3   Very Soft  
ARC-058   10.4   2   Very Soft  
ARC-062   12.5   3   Very Soft  
ARC-063   13.5   3   Very Soft  
ARC-064   5.5   1   Very Soft  
ARC-069   8.2   1   Very Soft  
ARC-072   12.2   3   Very Soft  
ARC-086   5.9   1   Very Soft  
ARC-087   10.7   2   Very Soft  
ARC-099   9.8   2   Very Soft  
Minimum Value   5.5       
Maximum Value   35.2  -    
Average Value   14.0       

  
Arctic ProjectPage 163
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

10.4.5Flotation Testwork

 

10.4.5.1Talc Optimization Testwork

 

Initial testing was completed on composites which had been retained in storage from previous Arctic test programs KM5000 and KM5718 with a flowsheet including pre-flotation rougher and cleaner stages. Table 10-27 summaries the baseline pre-flotation test results.

 

The results of these tests indicated similar pre-flotation circuit performance compared to results from the previous metallurgical test programs. One substantial difference noted was the extremely negative redox potentials measured in the pre-flotation rougher stage recorded for the tests in this program, although this did not appear to affect pre-flotation rougher performance in terms of mass recovery and metals losses to the pre-flotation concentrate.

 

Table 10-27: Summary of Baseline Pre-Flotation Tests

 

Test  

Original Tests

Distribution (%)

 

Current Tests

Distribution (%)

 
  Cu   Pb   Zn   Au   Ag   Cu   Pb   Zn   Au   Ag  
Composite 13 (KM5000)   3.3   3.7   3.0   4.3   4.0   2.7   4.4   2.9   1.3   3.4  
PP Composite 1 (KM5000)   1.0   1.1   0.3   2.4   0.3   1.3   5.1   1.2   1.3   3.3  
Zone 5 (KM5718)   0.4   0.7   0.2   0.3   0.6   0.4   0.7   0.2   0.3   0.6  
Zone 3-5 (KM5718)   0.3   0.9   0.3   1.4   0.8   0.4   0.8   0.4   0.6   0.8  
Composite 1B (KM5718)   1.4   4.8   1.3   1.0   3.7   1.6   3.4   1.6   3.2   2.4  

 

Notes: Values reflect recoveries to pre-flotation rougher for Composite 13, Zone 5, and PP Comp 1, and to pre-flotation cleaner concentrate for Master Composite 1B and Zone 3-5 composite

 

The Master Composite 2 was subjected to a series of eight pre-flotation was conducted which included two stages of cleaners was carried out using a variable screening test matrix. In these tests, whole rock and QEMSCAN mineralogical analyses were completed on the test products. High talc recoveries between 95 and 98% were recorded in all tests, but lower metal losses were recorded at a coarser primary grind sizing.

 

High grade talc concentrates ranging between 88 and 92% talc were measured for all variable screening tests after two cleaner stages. The percentage of the feed talc recovered to the pre-flotation cleaner concentrate varied widely between 61 and 92% and correlated with mass recovery. A total MIBC frother dosage between 55 and 77 g/ton appeared to be required to ensure a stable flotation froth and therefore high mass and talc recoveries. Copper, lead, zinc, and silver recoveries to the pre-flotation cleaner concentrate ranged between 0.5 and 1.0% indicating good rejection from the rougher concentrate by dilution cleaning with potential for recovery in the downstream sulphide flotation circuits Kinetic pre-flotation rougher and cleaner tests were completed with Master Composite 2 to provide flotation kinetic data for modelling by an external laboratory. A high-grade copper concentrate which measured between 22 and 24% copper was recovered to the final pre-flotation rougher concentrate following 8 minutes of initial rougher residence time; these tests were characterized by highly negative redox values in the initial pre-flotation rougher stages which increased to positive values by the final pre-flotation rougher stage.

 

  
Arctic ProjectPage 164
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Kinetic pre-flotation rougher and cleaner tests were completed with Master Composite 2 to provide flotation kinetic data for modelling by Metso Group. A high-grade copper concentrate which measured between 22 and 24% copper was recovered to the final pre-flotation rougher concentrate following 8 minutes of initial rougher residence time; these tests were characterized by highly negative redox values in the initial pre-flotation rougher stages which increased to positive values by the final pre-flotation rougher stage.

 

A 64-kilogram test was carried out in locked-cycle fashion using a bulk flotation flowsheet to generate pre-flotation concentrate and bulk final tails for dewatering and tailing consolidation tests by external laboratories. The bulk concentrate produced from the test was used for copper-lead separation tests using sodium cyanide to depress the copper sulphide minerals.

 

Test results indicated that on average, 93% of the copper was recovered to the lead rougher tails, and about 86% of the lead was recovered to the lead rougher concentrate. Lead losses were very high to the lead cleaner tails, and the flowsheet was more effective recovering talc to the lead cleaner concentrate. As a reverse flotation flowsheet with combined 3rd and 4th lead cleaner tails, about 56% of the lead and 30% of the silver was recovered to a lead concentrate with a calculated grade of about 58% lead and 0.2% silver.

  

10.4.5.2Flowsheet Development Testwork

 

The objective of the program was to investigate bulk and sequential flotation flowsheets with composites formed from two parent composites, and then select a flowsheet for a geometallurgical evaluation through testing with variability samples.

 

The mineralization was amenable to either a bulk flowsheet followed by copper-lead separation, or a sequential flowsheet, both following a pre-flotation stage to remove talc. Table 10-28 shows average performance obtained for the Avg Talc Composite in the Flowsheet Development phase of the testing.

 

Table 10-28: Comparison of Bulk vs. Sequential Locked-Cycle Test Results – ALS 2021

 

Composite   Assays   Distribution (%)  
  Cu
(%)
  Pb
(%)
  Zn
(%)
  Ag
(g/t)
  Au
(g/t)
  Mg
(%)
  Cu   Pb   Zn   Ag   Au  
                                             
Avg Talc Bulk  
Copper concentrate   28.0   0.86   4.27   181   4.17   0.46   87.3   8.3   9.1   36.0   60.9  
Lead concentrate   7.90   39.0   6.30   1124   4.75   1.23   5.1   78.1   2.8   46.0   14.3  
Zinc concentrate   0.87   0.38   55.9   41   0.35   0.04   1.9   2.6   83.3   5.7   3.5  
Avg Talc - Sequential  
Copper concentrate   27.6   0.87   2.05   168   3.23   1.96   90.2   8.9   4.7   34.9   48.7  
Lead concentrate   2.72   49.3   9.71   1360   5.31   1.40   1.2   69.9   3.1   39.4   11.2  

  
Arctic ProjectPage 165
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Composite   Assays   Distribution (%)  
  Cu
(%)
  Pb
(%)
  Zn
(%)
  Ag
(g/t)
  Au
(g/t)
  Mg
(%)
  Cu   Pb   Zn   Ag   Au  
Zinc concentrate   0.98   1.09   54.5   47   0.77   0.17   2.1   7.3   83.5   6.5   7.7  

 

Copper recovery to the copper concentrate was slightly higher for the sequential flowsheet; however, gold recovery to the copper concentrate was substantially lower. The lead concentrate grade for the Avg Talc composite could likely be improved over that shown in Table 10-28 with optimization of copper-lead separation conditions given the higher lead concentrate grade measured with other composites.

 

Zinc circuit performance was similar for the two flowsheets, although higher zinc recovery to the copper concentrate was recorded for the bulk circuit. Magnesium content in the copper concentrate was higher for the sequential circuit, but similar in the lead concentrate for both circuits.

 

10.4.5.3Variability Testwork

 

Based on economic analysis comparing the bulk and sequential circuit, the bulk circuit flowsheet was selected for the Variability testing. A total of 28 variability samples were selected for flotation testing which included open circuit cleaner tests, and 9 of these variability samples were selected for locked-cycle testing. Table 10-29 shows performance obtained for Variability testwork phase of the testing.

 

Most of the variability samples responded well to the developed bulk circuit flowsheet, when adjustments to dosages were made to account for variations in head grades. In the cleaner tests with the bulk flowsheet, an average of 88% of the copper and 76% of the lead was recovered to the bulk concentrate. Average zinc recovery was about 78% to a zinc concentrate which averaged 57% zinc. High zinc rougher recoveries were recorded when the copper sulphate addition in the conditioner stage was ratioed to the zinc feed grade at 100 g/t to 1% feed grade. Further optimization of copper sulphate additions might be possible with additional testing.

  

The variability test phase culminated with locked-cycle testing of 9 variability samples to determine closed-circuit performance. On average, about 93% of the copper and 84% of the lead was recovered to the bulk concentrate which measured 25% copper and 10% lead, on average. Good zinc performance was recorded in these tests with an average zinc recovery of 90% to a zinc concentrate which averaged 55% zinc. Most of the gold and silver was recovered to the bulk concentrate, averaging 74% and 84%, respectively.

 

   

  
Arctic ProjectPage 166
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Table 10-29: Summary of Variability Open Circuit Flotation Test Results – ALS 2022

 

Test   Product   Regrind Size
80% Passing
  Weight
(%)
  Assays   Distribution (%)  
Cu
(%)
  Pb
(%)
  Zn
(%)
  Au
(g/t)
  Ag
(g/t)
  S
(%)
  Cu   Pb   Zn   Au   Ag   S  

ARC-004

Test 64

  Talc Concentrate  

Flotation Feed: 68 µm;

Cu/Pb Rougher Concentrate: 38 µm;
Zn Rougher Concentrate: 20 µm

  -   -   -   -   -   -   -   -   -   -   -   -   -  
Cu/Pb Cleaner 2 Conc.   20.3   26.0   8.5   7.6   1.85   224   31.9   89.0   79.7   18.3   80.6   75.9   27.0  
Zn Cleaner 2 Concentrate   2.2   1.7   1.0   58.0   0.27   40   32.6   0.6   1.0   15.4   1.3   1.5   3.0  
Zn Cleaner 1 Sc. Tailings   0.9   5.0   2.4   14.6   0.51   106   20.4   0.7   1.0   1.5   1.0   1.5   0.7  
Zn Rougher Tailings   72.4   0.3   0.3   6.1   0.06   8   21.1   3.5   10.4   52.3   9.3   9.5   63.7  
Feed   100.0   5.9   2.2   8.4   0.47   60   24.0   100.0   100.0   100.0   100.0   100.0   100.0  
ARC-007
Test 71
  Talc Concentrate   Flotation Feed: 64 µm;
Cu/Pb Rougher Concentrate: 47 µm;
Zn Rougher Concentrate: 55 µm
  4.6   0.3   0.4   0.5   0.07   16   1.2   0.3   0.6   0.2   0.2   0.5   0.2  
Cu/Pb Cleaner 2 Conc.   19.0   25.9   12.6   3.2   5.63   506   30.9   85.9   89.1   4.8   76.8   69.3   20.0  
Zn Cleaner 2 Concentrate   17.2   0.7   0.2   63.8   0.30   38   33.6   2.0   1.3   85.5   3.7   4.7   19.6  
Zn Cleaner 1 Sc. Tailings   14.6   1.4   0.3   1.4   0.66   91   48.9   3.4   1.7   1.6   6.9   9.6   24.2  
Zn Rougher Tailings   40.0   0.4   0.2   0.5   0.21   12   22.4   2.5   3.4   1.4   6.0   3.5   30.4  
Feed   100.0   5.7   2.7   12.8   1.39   139   29.5   100.0   100.0   100.0   100.0   100.0   100.0  
ARC-008
Test 79
  Talc Concentrate   Flotation Feed: 64 µm;
Cu/Pb Rougher Concentrate: 41 µm;
Zn Rougher Concentrate: 35 µm
  -   -   -   -   -   -   -   -   -   -   -   -   -  
Cu/Pb Cleaner 2 Conc.   28.4   29.4   7.4   2.1   4.42   356   32.4   91.3   90.6   6.0   72.7   81.7   34.3  
Zn Cleaner 2 Concentrate   12.9   0.9   0.3   60.9   0.44   38   33.1   1.2   1.6   80.4   3.3   4.0   15.9  
Zn Cleaner 1 Sc. Tailings   3.0   2.9   0.5   5.6   4.55   121   34.6   1.0   0.6   1.7   7.9   2.9   3.9  
Zn Rougher Tailings   51.6   0.5   0.2   0.4   0.33   10   21.4   2.9   3.6   2.0   9.8   4.2   41.1  
Feed   100.0   9.2   2.3   9.8   1.73   124   26.9   100.0   100.0   100.0   100.0   100.0   100.0  
ARC-024
Test 89
  Talc Concentrate   Flotation Feed: 60 µm;
Cu/Pb Rougher Concentrate: 44 µm;
Zn Rougher Concentrate: 45 µm
  3.3   0.5   0.5   0.6   2.81   24   1.7   0.2   0.5   0.1   7.1   0.6   0.2  
Cu/Pb Cleaner 2 Conc.   27.7   27.1   9.3   1.8   3.36   410   32.6   90.1   91.8   3.5   70.6   81.6   31.1  
Zn Cleaner 2 Concentrate   20.0   0.7   0.2   61.8   0.29   40   33.7   1.8   1.6   86.6   4.4   5.8   23.3  
Zn Cleaner 1 Sc. Tailings   4.5   2.1   0.4   3.3   1.10   49   45.0   1.1   0.7   1.0   3.8   1.6   7.1  
Zn Rougher Tailings   39.7   0.6   0.2   0.7   0.27   13   23.6   2.6   2.4   1.9   8.1   3.7   32.4  
Feed   100.0   8.3   2.8   14.3   1.32   139   28.9   100.0   100.0   100.0   100.0   100.0   100.0  
ARC-039
Test 111
  Talc Concentrate   Flotation Feed: 75 µm;
Cu/Pb Rougher Concentrate: 45 µm;
Zn Rougher Concentrate: 48 µm
  -   -   -   -   -   -   -   -   -   -   -   -   -  
Cu/Pb Cleaner 2 Conc.   21.0   21.3   16.8   6.0   3.44   420   30.3   88.0   87.1   8.3   42.7   83.1   22.6  
Zn Cleaner 2 Concentrate   22.8   0.5   0.4   54.4   0.79   22   33.4   2.3   2.5   81.9   10.7   4.7   27.1  
Zn Cleaner 1 Sc. Tailings   10.3   0.5   0.4   1.0   2.16   15   49.0   1.1   1.0   0.7   13.2   1.5   18.0  
Zn Rougher Tailings   37.0   0.4   0.4   1.1   0.50   11   14.7   3.2   3.6   2.7   11.0   3.8   19.3  
Feed   100.0   5.1   4.0   15.1   1.69   106   28.1   100.0   100.0   100.0   100.0   100.0   100.0  
ARC-044
Test 81
  Talc Concentrate   Flotation Feed: 81 µm;
Cu/Pb Rougher Concentrate: 57 µm
  -   -   -   -   -   -   -   -   -   -   -   -   -  
Cu/Pb Cleaner 2 Conc.   6.0   31.1   0.2   0.3   3.57   260   33.8   96.0   23.9   23.9   79.2   91.4   38.9  
Zn Cleaner 2 Concentrate   -   -   -   -   -   -   -   -   -   -   -   -   -  
Zn Cleaner 1 Sc. Tailings   -   -   -   -   -   -   -   -   -   -   -   -   -  
Zn Rougher Tailings   -   -   -   -   -   -   -   -   -   -   -   -   -  
Feed   100.0   1.9   0.0   0.1   0.27   17   5.2   100.0   100.0   100.0   100.0   100.0   100.0  
ARC-050
Test 77
  Talc Concentrate   Flotation Feed: 71 µm;
Cu/Pb Rougher Concentrate: 43 µm;
Zn Rougher Concentrate: 46 µm
  -   -   -   -   -   -   -   -   -   -   -   -   -  
Cu/Pb Cleaner 2 Conc.   10.1   31.1   1.0   1.1   3.06   294   33.0   93.3   67.2   9.8   71.5   79.8   37.8  
Zn Cleaner 2 Concentrate   1.8   2.6   0.3   47.1   0.85   92   29.8   1.4   3.7   75.4   3.5   4.4   6.1  
Zn Cleaner 1 Sc. Tailings   9.6   0.2   0.1   0.1   0.18   7   6.0   0.4   3.3   1.2   4.0   1.8   6.5  
Zn Rougher Tailings   73.9   0.1   0.0   0.0   0.08   3   5.3   1.5   20.6   2.6   13.7   6.0   44.2  
Feed   100.0   3.4   0.1   1.1   0.43   37   8.8   100.0   100.0   100.0   100.0   100.0   100.0  
ARC-051
Test 110
  Talc Concentrate   Flotation Feed: 64 µm;
Cu/Pb Rougher Concentrate: 48 µm;
Zn Rougher Concentrate: 50 µm
  1.0   0.3   1.6   0.6   0.06   40   1.9   0.1   0.7   0.0   0.2   0.6   0.1  
Cu/Pb Cleaner 2 Conc.   14.4   24.4   13.0   3.4   1.67   368   31.7   84.2   84.2   3.8   62.4   82.1   15.1  
Zn Cleaner 2 Concentrate   19.5   0.8   0.3   59.0   0.20   10   33.5   3.5   2.7   88.6   10.1   3.0   21.5  
Zn Cleaner 1 Sc. Tailings   12.5   0.6   0.3   0.9   0.18   9   50.4   1.6   1.6   0.8   5.8   1.7   20.8  
Zn Rougher Tailings   47.3   0.3   0.2   0.6   0.08   8   22.9   3.7   4.9   2.2   9.8   5.8   35.6  
Feed   100.0   4.2   2.2   13.0   0.39   65   30.4   100.0   100.0   100.0   100.0   100.0   100.0  
ARC-052
Test 110
  Talc Concentrate   Flotation Feed: 69 µm;
Cu/Pb Rougher Concentrate: 45 µm;
Zn Rougher Concentrate: 43 µm
  1.1   0.6   0.2   0.6   0.01   13   1.7   0.1   0.1   0.0   0.0   0.1   0.1  
Cu/Pb Cleaner 2 Conc.   26.5   29.7   7.2   2.0   3.67   370   32.2   88.1   88.8   3.9   78.8   77.6   29.9  
Zn Cleaner 2 Concentrate   16.2   0.6   0.3   63.8   0.22   24   33.6   1.0   2.0   73.7   2.9   3.1   19.0  
Zn Cleaner 1 Sc. Tailings   4.9   2.3   0.4   7.5   0.57   44   38.6   1.3   0.9   2.6   2.3   1.7   6.6  
Zn Rougher Tailings   43.8   0.5   0.1   0.4   0.08   9   23.3   2.2   2.6   1.1   2.8   3.1   35.8  
Feed   100.0   8.9   2.2   14.0   1.24   126   28.5   100.0   100.0   100.0   100.0   100.0   100.0  
ARC-054
Test 60
  Talc Concentrate   Flotation Feed: 67 µm;
Cu/Pb Rougher Concentrate: 61 µm;
Zn Rougher Concentrate: 38 µm
  2.0   3.6   0.3   0.4   0.15   32   4.8   1.4   0.4   0.1   0.6   0.7   0.4  
Cu/Pb Cleaner 2 Conc.   16.8   28.3   6.4   1.8   1.69   460   33.0   90.3   89.9   5.2   56.8   83.4   24.6  
Zn Cleaner 2 Concentrate   7.3   0.8   0.3   60.2   0.64   38   32.1   1.1   1.9   76.2   9.3   3.0   10.3  
Zn Cleaner 1 Sc. Tailings   1.9   1.4   0.3   6.3   0.39   51   20.4   0.5   0.5   2.1   1.5   1.1   1.7  
Zn Rougher Tailings   68.4   0.2   0.1   0.2   0.09   6   18.9   2.3   2.9   2.0   12.3   4.1   57.3  
Feed   100.0   5.3   1.2   5.7   0.50   93   22.5   100.0   100.0   100.0   100.0   100.0   100.0  
ARC-055
Test 92
  Talc Concentrate   Flotation Feed: 72 µm;
Cu/Pb Rougher Concentrate: 69 µm;
Zn Rougher Concentrate: 54 µm
  26.9   0.4   0.2   0.8   0.01   15   1.9   3.7   6.3   3.5   0.7   6.2   3.5  
Cu/Pb Cleaner 2 Conc.   9.9   26.3   6.4   1.5   3.08   508   29.9   84.9   78.3   2.4   81.5   77.9   20.0  
Zn Cleaner 2 Concentrate   8.9   0.7   0.2   60.0   0.15   18   32.0   2.0   2.1   84.9   3.6   2.5   19.2  
Zn Cleaner 1 Sc. Tailings   2.2   1.0   0.3   2.9   0.57   23   13.7   0.7   0.7   1.0   3.3   0.8   2.0  
Zn Rougher Tailings   48.4   0.2   0.1   0.3   0.01   8   15.5   2.7   7.7   2.4   1.3   6.0   50.4  
Feed   100.0   3.1   0.8   6.3   0.38   65   14.9   100.0   100.0   100.0   100.0   100.0   100.0  
ARC-056
Test 82
  Talc Concentrate   Flotation Feed: 73 µm;
Cu/Pb Rougher Concentrate: 52 µm;
Zn Rougher Concentrate: 29 µm
  11.7   0.7   0.1   0.7   0.10   17   2.1   1.0   2.0   1.0   1.2   1.8   0.9  
Cu/Pb Cleaner 2 Conc.   23.5   30.6   3.0   1.3   3.03   390   33.3   90.5   84.8   3.9   71.1   82.3   30.2  
Zn Cleaner 2 Concentrate   10.7   0.9   0.2   60.4   0.26   20   32.4   1.2   1.9   85.1   2.8   1.9   13.4  
Zn Cleaner 1 Sc. Tailings   1.0   4.3   0.5   7.2   1.51   90   27.7   0.6   0.6   1.0   1.6   0.8   1.1  
Zn Rougher Tailings   49.7   0.5   0.1   0.4   0.28   14   26.2   2.9   6.5   2.7   13.9   6.2   50.1  
Feed   100.0   8.0   0.8   7.6   1.00   112   26.0   100.0   100.0   100.0   100.0   100.0   100.0  
ARC-057
Test 83
  Talc Concentrate   Flotation Feed:132µm;
Cu/Pb Rougher Concentrate: 87 µm
  44.1   0.2   0.0   0.1   0.03   2   0.4   9.1   20.4   14.7   12.3   9.5   10.0  
Cu/Pb Cleaner 2 Conc.   3.9   21.0   0.9   0.2   1.57   184   21.2   80.1   52.1   2.6   56.8   76.7   45.7  
Zn Cleaner 2 Concentrate   -   -   -   -   -   -   -   -   -   -   -   -   -  
Zn Cleaner 1 Sc. Tailings   -   -   -   -   -   -   -   -   -   -   -   -   -  
Zn Rougher Tailings   -   -   -   -   -   -   -   -   -   -   -   -   -  
Feed   100.0   1.0   0.1   0.2   0.11   9   1.8   100.0   100.0   100.0   100.0   100.0   100.0  
ARC-058
Test 74
  Talc Concentrate   Flotation Feed: 68 µm;
Cu/Pb Rougher Concentrate: 50 µm;
Zn Rougher Concentrate: 44 µm
  0.7   1.6   1.0   0.9   0.42   47   4.1   0.2   0.3   0.0   0.2   0.3   0.1  
Cu/Pb Cleaner 2 Conc.   21.1   26.1   10.2   2.6   4.47   394   32.9   89.5   90.3   3.8   68.0   79.4   22.5  
Zn Cleaner 2 Concentrate   21.8   0.6   0.2   58.0   0.35   22   33.7   2.0   1.9   88.1   5.5   4.6   23.8  
Zn Cleaner 1 Sc. Tailings   4.7   1.3   0.4   2.6   1.67   27   42.8   1.0   0.7   0.8   5.6   1.2   6.4  
Zn Rougher Tailings   46.9   0.3   0.1   0.6   0.21   7   27.4   2.3   2.7   1.9   7.1   3.1   41.5  
Feed   100.0   6.2   2.4   14.4   1.39   105   30.9   100.0   100.0   100.0   100.0   100.0   100.0  

  
Arctic ProjectPage 167
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Test   Product   Regrind Size
80% Passing
  Weight
(%)
  Assays   Distribution (%)  
Cu
(%)
  Pb
(%)
  Zn
(%)
  Au
(g/t)
  Ag
(g/t)
  S
(%)
  Cu   Pb   Zn   Au   Ag   S  
ARC-059
Test 84
  Talc Concentrate   Flotation Feed: 85 µm;
Cu/Pb Rougher Concentrate: 71 µm;
Zn Rougher Concentrate: 69 µm
  16.5   0.9   0.2   0.9   0.96   17   2.1   2.4   4.2   2.2   29.8   3.6   2.6  
Cu/Pb Cleaner 2 Conc.   18.1   29.9   2.9   1.4   1.70   366   32.2   91.0   87.8   4.1   57.9   85.3   45.0  
Zn Cleaner 2 Concentrate   9.9   0.9   0.1   55.0   0.14   22   32.0   1.5   2.2   85.9   2.6   2.8   24.4  
Zn Cleaner 1 Sc. Tailings   2.7   0.7   0.1   1.2   0.56   14   7.4   0.3   0.3   0.5   2.9   0.5   1.6  
Zn Rougher Tailings   48.3   0.1   0.0   0.1   0.01   5   5.5   0.8   2.5   1.1   0.9   3.1   20.6  
Feed   100.0   5.9   0.6   6.3   0.53   77   12.9   100.0   100.0   100.0   100.0   100.0   100.0  
ARC-062
Test 75
  Talc Concentrate   Flotation Feed: 71 µm;
Cu/Pb Rougher Concentrate: 42 µm;
Zn Rougher Concentrate: 43 µm
  1.8   0.8   7.6   1.6   0.14   56   4.3   0.6   2.0   0.1   0.8   1.8   0.4  
Cu/Pb Cleaner 2 Conc.   14.6   13.6   41.0   3.6   1.36   326   21.7   88.2   91.8   2.7   63.2   87.8   16.1  
Zn Cleaner 2 Concentrate   30.7   0.3   0.4   58.6   0.12   6   32.3   4.2   1.7   92.0   11.7   3.4   50.3  
Zn Cleaner 1 Sc. Tailings   4.4   0.7   0.5   3.1   0.61   10   37.1   1.3   0.4   0.7   8.6   0.8   8.4  
Zn Rougher Tailings   44.9   0.1   0.2   0.4   0.04   3   8.2   2.0   1.0   1.0   5.7   2.5   18.7  
Feed   100.0   2.3   6.5   19.5   0.31   54   19.7   100.0   100.0   100.0   100.0   100.0   100.0  
ARC-063
Test 85
  Talc Concentrate   Flotation Feed:117µm;
Cu/Pb Rougher Concentrate: 72 µm;
Zn Rougher Concentrate: 69 µm
  43.1   1.1   0.1   0.7   0.01   6   2.4   11.2   25.3   12.3   6.8   15.2   12.3  
Cu/Pb Cleaner 2 Conc.   11.4   29.3   0.4   0.6   0.36   102   30.4   78.6   56.3   3.0   64.7   68.7   41.5  
Zn Cleaner 2 Concentrate   3.1   1.7   0.1   55.6   0.17   14   32.7   1.2   2.2   73.0   8.4   2.6   12.2  
Zn Cleaner 1 Sc. Tailings   3.2   1.0   0.1   1.4   0.06   7   6.6   0.8   1.9   1.9   3.0   1.3   2.5  
Zn Rougher Tailings   35.3   0.2   0.0   0.2   0.01   2   5.9   1.4   8.3   2.5   5.5   4.2   24.9  
Feed   100.0   4.3   0.1   2.4   0.06   17   8.4   100.0   100.0   100.0   100.0   100.0   100.0  
ARC-068
Test 97
  Talc Concentrate   Flotation Feed: 68 µm;
Cu/Pb Rougher Concentrate: 69 µm;
Zn Rougher Concentrate: 59 µm
  -   -   -   -   -   -   -   -   -   -   -   -   -  
Cu/Pb Cleaner 2 Conc.   8.1   31.4   0.8   0.7   1.36   186   33.7   95.6   71.0   4.4   75.5   72.4   42.9  
Zn Cleaner 2 Concentrate   2.2   0.9   0.1   50.5   0.52   34   32.0   0.7   2.8   84.9   7.9   3.6   11.1  
Zn Cleaner 1 Sc. Tailings   3.4   0.3   0.1   0.4   0.12   18   21.7   0.4   2.1   1.0   2.8   3.0   11.6  
Zn Rougher Tailings   83.3   0.0   0.0   0.1   0.01   4   1.9   0.6   17.4   3.8   5.7   16.0   25.3  
Feed   100.0   2.7   0.1   1.3   0.15   21   6.4   100.0   100.0   100.0   100.0   100.0   100.0  
ARC-069
Test 106
  Talc Concentrate   Flotation Feed: 62 µm;
Cu/Pb Rougher Concentrate: 49 µm;
Zn Rougher Concentrate: 56 µm
  9.6   0.3   0.3   0.7   0.01   16   1.7   0.8   2.4   0.6   0.7   2.7   0.7  
Cu/Pb Cleaner 2 Conc.   10.8   25.7   9.6   2.7   0.58   396   32.8   86.4   83.3   3.0   44.8   74.7   15.0  
Zn Cleaner 2 Concentrate   15.3   0.6   0.2   58.4   0.20   24   33.9   3.0   2.7   91.2   22.0   6.4   22.1  
Zn Cleaner 1 Sc. Tailings   12.2   0.4   0.2   0.7   0.12   12   50.0   1.5   1.7   0.9   10.5   2.6   25.8  
Zn Rougher Tailings   48.5   0.2   0.1   0.3   0.04   9   14.8   3.2   3.9   1.6   13.9   7.6   30.5  
Feed   100.0   3.2   1.2   9.8   0.14   57   23.6   100.0   100.0   100.0   100.0   100.0   100.0  
ARC-072
Test 78
  Talc Concentrate   Flotation Feed: 69 µm;
Cu/Pb Rougher Concentrate: 46 µm;
Zn Rougher Concentrate: 36 µm
  3.0   0.6   0.4   1.3   0.32   57   3.2   0.4   2.7   0.4   0.8   1.6   0.4  
Cu/Pb Cleaner 2 Conc.   16.3   29.3   1.8   3.5   5.38   476   33.6   91.5   70.2   6.1   71.3   71.6   21.9  
Zn Cleaner 2 Concentrate   14.2   0.7   0.2   56.2   0.69   48   33.3   1.8   5.0   85.5   8.0   6.3   18.9  
Zn Cleaner 1 Sc. Tailings   3.8   0.9   0.2   2.1   0.54   51   27.1   0.6   1.8   0.8   1.7   1.8   4.1  
Zn Rougher Tailings   58.8   0.2   0.1   0.2   0.24   19   21.2   2.0   13.9   1.2   11.5   10.3   49.9  
Feed   100.0   5.2   0.4   9.3   1.23   108   25.0   100.0   100.0   100.0   100.0   100.0   100.0  
ARC-080
Test 113
  Talc Concentrate   Flotation Feed: 68 µm;
Cu/Pb Rougher Concentrate: 45 µm
  6.4   0.2   0.0   0.0   0.15   10   0.4   0.9   4.7   1.7   1.6   2.7   1.0  
Cu/Pb Cleaner 2 Conc.   3.6   30.4   1.0   0.4   12.7   426   31.3   88.4   66.5   9.8   77.2   65.0   43.3  
Zn Cleaner 2 Concentrate   -   -   -   -   -   -   -   -   -   -   -   -   -  
Zn Cleaner 1 Sc. Tailings   -   -   -   -   -   -   -   -   -   -   -   -   -  
Zn Rougher Tailings   -   -   -   -   -   -   -   -   -   -   -   -   -  
Feed   100.0   1.3   0.1   0.2   0.60   24   2.6   100.0   100.0   100.0   100.0   100.0   100.0  
ARC-084
Test 91
  Talc Concentrate   Flotation Feed: 78 µm;
Cu/Pb Rougher Concentrate: 46 µm;
Zn Rougher Concentrate: 43 µm
  2.1   0.5   0.3   0.9   0.04   15   3.9   0.4   1.5   0.3   0.5   1.1   0.3  
Cu/Pb Cleaner 2 Conc.   9.0   25.2   3.0   5.5   1.40   180   35.0   85.8   60.1   9.3   71.7   57.6   13.0  
Zn Cleaner 2 Concentrate   7.5   0.9   0.3   54.6   0.18   42   33.1   2.7   5.3   77.4   7.7   11.3   10.3  
Zn Cleaner 1 Sc. Tailings   2.5   1.3   0.4   3.1   0.18   29   30.2   1.3   2.4   1.5   2.6   2.6   3.2  
Zn Rougher Tailings   75.9   0.2   0.1   0.3   0.01   7   21.9   4.3   22.3   4.4   4.3   18.9   68.9  
Feed   100.0   2.6   0.4   5.3   0.18   28   24.1   100.0   100.0   100.0   100.0   100.0   100.0  
ARC-086
Test 86
  Talc Concentrate   Flotation Feed: 59 µm;
Cu/Pb Rougher Concentrate: 45 µm;
Zn Rougher Concentrate: 35 µm
  0.4   0.3   0.1   0.2   0.81   14   1.7   0.0   0.1   0.0   0.3   0.1   0.0  
Cu/Pb Cleaner 2 Conc.   10.7   28.7   7.1   1.2   6.54   430   33.3   75.9   87.3   1.8   63.0   55.4   15.6  
Zn Cleaner 2 Concentrate   12.4   5.1   0.2   53.8   0.79   176   32.1   15.7   2.4   92.9   8.9   26.4   17.5  
Zn Cleaner 1 Sc. Tailings   3.0   1.8   0.3   2.0   1.53   70   28.2   1.3   0.9   0.8   4.1   2.5   3.7  
Zn Rougher Tailings   71.0   0.1   0.1   0.1   0.18   9   19.1   2.3   4.9   1.2   11.5   7.7   59.6  
Feed   100.0   4.0   0.9   7.2   1.11   83   22.7   100.0   100.0   100.0   100.0   100.0   100.0  
ARC-087
Test 87
  Talc Concentrate   Flotation Feed: 67 µm;
Cu/Pb Rougher Concentrate: 36 µm;
Zn Rougher Concentrate: 31 µm
  1.4   0.9   0.5   0.7   0.21   24   2.0   0.1   0.2   0.1   0.1   0.2   0.1  
Cu/Pb Cleaner 2 Conc.   37.1   26.4   10.4   6.6   6.04   394   30.7   91.9   91.9   16.6   66.5   83.9   47.6  
Zn Cleaner 2 Concentrate   14.1   0.7   0.4   61.7   0.78   30   32.4   0.9   1.3   59.0   3.3   2.4   19.0  
Zn Cleaner 1 Sc. Tailings   2.9   3.3   0.9   13.3   12.2   96   27.1   0.9   0.6   2.6   10.5   1.6   3.3  
Zn Rougher Tailings   36.9   0.6   0.2   0.7   0.61   18   13.1   1.9   1.7   1.8   6.7   3.8   20.2  
Feed   100.0   10.7   4.2   14.7   3.37   174   23.9   100.0   100.0   100.0   100.0   100.0   100.0  
ARC-092
Test 90
  Talc Concentrate   Flotation Feed: 68 µm;
Cu/Pb Rougher Concentrate: 46 µm;
Zn Rougher Concentrate: 29 µm
  5.1   0.5   0.0   0.2   0.03   5   2.6   0.5   1.6   0.2   0.6   1.2   0.4  
Cu/Pb Cleaner 2 Conc.   13.7   29.1   0.4   2.5   1.01   108   34.6   87.6   46.6   6.7   54.3   67.0   15.4  
Zn Cleaner 2 Concentrate   7.8   1.2   0.2   54.4   0.59   24   33.8   2.0   9.0   83.0   18.0   8.4   8.5  
Zn Cleaner 1 Sc. Tailings   1.7   2.6   0.2   3.3   0.06   26   27.0   0.9   2.6   1.1   0.4   1.9   1.5  
Zn Rougher Tailings   68.8   0.3   0.1   0.2   0.04   4   31.8   4.4   31.8   2.8   10.8   12.4   71.0  
Feed   100.0   4.6   0.1   5.1   0.26   22   30.8   100.0   100.0   100.0   100.0   100.0   100.0  
ARC-098
Test 93
  Talc Concentrate   Flotation Feed:103µm;
Cu/Pb Rougher Concentrate: 89 µm
  -   -   -   -   -   -   -   -   -   -   -   -   -  
Cu/Pb Cleaner 2 Conc.   4.0   25.6   0.7   0.8   1.32   578   29.5   97.8   69.9   34.5   75.8   92.6   82.1  
Zn Cleaner 2 Concentrate   -   -   -   -   -   -   -   -   -   -   -   -   -  
Zn Cleaner 1 Sc. Tailings   -   -   -   -   -   -   -   -   -   -   -   -   -  
Zn Rougher Tailings   -   -   -   -   -   -   -   -   -   -   -   -   -  
Feed   100.0   1.1   0.0   0.1   0.07   25   1.5   100.0   100.0   100.0   100.0   100.0   100.0  
ARC-099
Test 80
  Talc Concentrate   Flotation Feed: 69 µm;
Cu/Pb Rougher Concentrate: 48 µm;
Zn Rougher Concentrate: 41 µm
  2.0   0.9   0.5   0.6   0.04   22   1.8   0.3   0.4   0.1   0.2   0.5   0.2  
Cu/Pb Cleaner 2 Conc.   19.9   28.3   9.9   2.8   0.95   404   31.9   90.4   89.6   4.7   55.9   86.6   29.0  
Zn Cleaner 2 Concentrate   15.7   0.6   0.3   63.2   0.11   18   32.5   1.4   2.1   83.3   5.1   3.0   23.3  
Zn Cleaner 1 Sc. Tailings   4.1   1.8   0.4   7.5   0.71   30   29.1   1.2   0.7   2.6   8.7   1.3   5.5  
Zn Rougher Tailings   54.2   0.2   0.1   0.2   0.10   4   14.7   2.1   2.0   0.8   16.1   2.3   36.4  
Feed   100.0   6.2   2.2   11.9   0.34   93   21.9   100.0   100.0   100.0   100.0   100.0   100.0  

  
Arctic ProjectPage 168
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

10.4.5.4Copper/Lead Separation Testwork

 

A copper-lead separation test was included for the bulk concentrate produced in selected cleaner tests and later cycles of 5 locked-cycle tests. Table 10-30 summarizes the copper/lead separation testwork results.

 

Reasonable separations were achieved for all but ARC-003. For ARC-003, a low-grade lead concentrate which measured only about 16% lead was produced, even when the test was repeated with a much higher sodium cyanide dosage. It is unclear what caused the poor copper-lead separation for ARC-003. For the other 7 samples tested, lead recoveries from the bulk concentrate ranged between 75 and 95% to a lead concentrate with an average grade of about 56% lead in open circuit.

 

Copper-lead separation recoveries from tests on the locked cycle test concentrates were applied to bulk circuit recoveries to calculate overall recoveries. Silver recovery to the lead concentrate averaged about 75%, but gold recoveries in the copper separation tests varied widely and might indicate differences in gold deportment and associations between lithology types.

 

Figure 10 9 summarises the results showing the individual and combined concentrate grades and copper recovery. Figure 10 10 summarises the results showing the individual and combined concentrate grades and lead recovery.

 

Figure 10-9: Variability Composite Copper Recovery vs. Concentrate Grade

 

 

Source: Ausenco, 2022.

  
Arctic ProjectPage 169
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Figure 10-10: Variability Composite Lead Recovery vs. Concentrate Grade

 

 

Source: Ausenco, 2022.

  
Arctic ProjectPage 170
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Table 10-30: ALS Lead Separation Test Results

 

Test   Product   Weight
(%)
  Assays   Distribution (%)  
Cu
(%)
  Pb
(%)
  Zn
(%)
  Ag
(g/t)
  Au
(g/t)
  S
(%)
  Cu   Pb   Zn   Ag   Au   S  
ARC-051
Cu/Pb Separation Feed from Open Circuit Test (Test 88)
  Pb 3rd Cleaner Concentrate   25.5   5.1   48.4   9.3   1242   4.6   21.5   5.5   86.2   68.2   83.9   75.9   17.7  
Pb 2nd Cleaner Concentrate   30.9   6.9   43.8   9.11   1098   3.94   23.5   9.0   92.0   81.0   90.0   79.7   23.4  
Pb 1st Cleaner Concentrate   37.7   10.0   37.3   8.0   938   3.35   25.3   16   95.8   86.9   93.9   82.8   30.8  
Pb Rougher Concentrate   49.4   14.7   29.1   6.41   734   2.68   27.3   30.6   97.8   91.1   96.2   86.4   43.6  
Pb Rougher Tailings (Cu Concentrate)   50.6   32.4   0.7   0.6   28   0.41   34.5   69.4   2.2   8.9   3.8   13.6   56.4  
Cu/Pb 2nd Cleaner Concentrate (Head)   100.0   23.6   14.7   3.47   377   1.53   31   100   100   100   100   100   100  
ARC-024
Cu/Pb Separation Feed from Open Circuit Test (Test 89)
  Pb 3rd Cleaner Concentrate   14.4   5.2   58.6   5.9   2230   17   18.6   2.8   87.5   47.3   78.5   72.9   8.2  
Pb 2nd Cleaner Concentrate   17.8   8.1   50.5   5.7   1929   14.4   21.0   5.3   93.2   56.4   83.9   76.2   11.5  
Pb 1st Cleaner Concentrate   24.2   13.4   38.5   4.8   1481   11.3   24.4   12.0   96.6   64.6   87.5   81.1   18.2  
Pb Rougher Concentrate   39.3   20.0   24.2   3.3   949   7.4   28.3   29.0   98.2   72.7   90.8   86.5   34.2  
Pb Rougher Tailings (Cu Concentrate)   60.7   31.7   0.3   0.8   62   0.75   35.3   81   1.8   27.3   9.2   13.5   65.8  
Cu/Pb 2nd Cleaner Concentrate (Head)   100.0   27.1   9.7   1.8   410   3.4   32.6   100   100   100   100   100   100  
ARC-007
Cu/Pb Separation Feed from LCT-96
(Cycle 5)
  Pb 3rd Cleaner Concentrate   19.3   2.3   58.6   6.0   1710   0.4   19.9   1.8   93.4   29   57.3   1.7   12.1  
Pb 2nd Cleaner Concentrate   20.8   2.5   55.8   6.04   1629   0.5   21.4   2.2   95.8   31.4   58.8   2.2   14.0  
Pb 1st Cleaner Concentrate   21.9   3.1   53.8   6.04   1574   0.54   21.8   2.8   96.9   33.0   59.6   2.4   15.1  
Pb Rougher Concentrate   24.6   5.6   48.2   5.8   1438   1.05   22.9   5.6   97.9   35.4   61.3   5.4   17.8  
Pb Rougher Tailings (Cu Concentrate)   75.4   30.6   0.3   3.4   296   6.03   34.6   94.4   2.1   64.6   38.7   94.6   82.2  
Cu/Pb 2nd Cleaner Concentrate (Head)   100.0   24.4   12.1   4   577   4.8   31.7   100   100   100   100   100   100  
ARC-099
Cu/Pb Separation Feed from
LCT-100 (Cycle 5)
  Pb 3rd Cleaner Concentrate   20.3   10.7   46.5   5   1420   0.98   22.1   8.6   94.7   18.3   81.2   12.4   14.2  
Pb 2nd Cleaner Concentrate   23.9   13.1   40.2   4.8   1230   0.94   23.8   12.4   96.3   20.7   82.8   14.0   18.0  
Pb 1st Cleaner Concentrate   29.0   15.7   33.6   4.52   1033   0.88   25.5   18.0   97.4   23.6   84.2   15.9   23.4  
Pb Rougher Concentrate   37.6   18.9   26.1   4.3   815   0.96   27.4   28.1   98.2   29.2   86.1   22.4   32.5  
Pb Rougher Tailings (Cu Concentrate)   62.4   29.2   0.3   6.3   79   2.0   34.2   71.9   1.8   70.8   13.9   77.6   67.5  
Cu/Pb 2nd Cleaner Concentrate (Head)   100.0   25.3   10.0   5.5   356   1.6   31.6   100   100   100   100   100   100  
ARC-058
Cu/Pb Separation Feed from
LCT-104 (Cycle 5)
  Pb 3rd Cleaner Concentrate   14.9   3.6   60.7   5.2   2012   8.75   19.2   1.9   83.1   32.1   68.8   37.6   8.8  
Pb 2nd Cleaner Concentrate   19.8   4.7   51.1   5.9   17.1   7.5   22.8   3.4   92.4   47.8   76.9   42.6   13.9  
Pb 1st Cleaner Concentrate   23.2   7.0   45.3   5.6   1523   6.8   24.4   5.8   96.2   53.7   80.8   45.1   17.4  
Pb Rougher Concentrate   31.5   13.7   34.0   4.6   1166   6.1   27.0   15.5   98.1   59.8   84.0   54.9   26.2  
Pb Rougher Tailings (Cu Concentrate)   68.5   34.2   0.3   1.4   102   2.3   35.0   84.5   1.9   40.2   16.0   45.1   73.8  
Cu/Pb 2nd Cleaner Concentrate (Head)   100.0   27.7   10.9   2.4   437   3.5   32.5   100   100   100   100   100   100  
ARC-062
Cu/Pb Separation Feed from
LCT-105 (Cycle 5)
  Pb 3rd Cleaner Concentrate   60.0   4.0   63.4   7.0   482   1.5   17.8   18.3   92.1   74.8   85.6   65.5   45.3  
Pb 2nd Cleaner Concentrate   66.2   5.5   59.3   6.9   454   1.5   19.0   27.8   95.0   81.4   89.0   72.1   53.3  
Pb 1st Cleaner Concentrate   73.2   7.6   54.6   6.6   424   1.7   20.2   42.4   96.7   85.9   91.8   93.1   62.8  
Pb Rougher Concentrate   82.6   10.0   49.1   6.2   389   1.5   21.7   63.2   98.1   90.5   94.9   94.9   75.9  
Pb Rougher Tailings (Cu Concentrate)   17.4   27.6   4.6   3.1   98   0.4   32.6   36.8   1.9   9.5   5.1   5.1   24.1  
Cu/Pb 2nd Cleaner Concentrate (Head)   100.0   13.1   41.3   5.6   338   1.3   23.6   100   100   100   100   100   100  
ARC-069
Cu/Pb Separation Feed from LCT-114 (Cycle 5)
  Pb 3rd Cleaner Concentrate   12.0   2.0   60.4   3.2   2168   0.2   16.5   1.1   75.1   11.1   64.0   4.3   6.2  
Pb 2nd Cleaner Concentrate   16.5   2.2   51.1   4.6   1848   0.23   20.9   1.6   88.0   2.1   75.6   6.6   10.8  
Pb 1st Cleaner Concentrate   20.6   2.8   44.1   5.1   1596   0.25   23.9   2.5   94.6   30.6   81.4   8.7   15.4  
Pb Rougher Concentrate   25.2   5.7   37.1   5.1   1355   0.3   25.3   6.4   97.3   37.7   84.5   12.4   19.9  
Pb Rougher Tailings (Cu Concentrate)   74.8   28.5   0.4   2.9   84   0.7   34.3   93.6   2.7   62.3   15.5   87.6   80.1  
Cu/Pb 2nd Cleaner Concentrate (Head)   100.0   22.7   9.6   3.4   405   0.6   32.0   100   100   100   100   100   100  
ARC-008
Cu/Pb Separation Feed from
LCT-116 (Cycle 5)
  Pb 4th Cleaner Concentrate   5.4   5.1   64.6   3.1   2540   3.1   16.1   1.0   47.2   6.5   39.0   4.3   2.6  
Pb 3rd Cleaner Concentrate   9.3   4.5   62.5   4.0   2298   2.3   17.4   1.5   78.2   14.6   60.5   5.4   4.9  
Pb 2nd Cleaner Concentrate   11.1   5.1   59.5   4.5   2176   2.2   18.4   2.0   88.9   19.4   68.4   6.2   6.1  
Pb 1st Cleaner Concentrate   13.9   8.1   50.5   4.9   1858   2.5   21.0   3.9   94.9   26.8   73.4   8.9   8.8  
Pb Rougher Concentrate   26.2   19.2   27.5   3.5   1060   3.8   27.5   17.6   97.0   36.0   78.7   25.5   21.7  
Pb Rougher Tailings (Cu Concentrate)   73.8   31.9   0.3   2.2   102   4.0   35.2   82.4   3.0   64.0   21.3   47.5   78.3  
                                                       

  
Arctic ProjectPage 171
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

10.5Comment on Mineral Processing and Metallurgical Testwork

 

The materials tested in the metallurgical programs as described in this Section are representative of the LOM production.

 

The bulk flotation flowsheet developed based on the 2012 to 2022 testwork is feasible.

 

Recent grinding and concentrate dewatering testwork have supported the selected flow sheet. Additional concentrate characterization is also recommended for future metallurgical samples to bolster the confidence in the design of the proposed grinding plant.

 

The continuation of the geometallurgical program is recommended to further confirm the flowsheet and better understand the continuity of the Arctic deposit with respect to the metallurgical response. This testwork is recommended to take the form of locked cycle tests using a variety of metallurgical samples representing both lithology types and spatial zones within the deposit. A continuation of a phased approach to additional testwork is recommended to ensure that representative testwork is managed properly.

 

Historical testwork has shown the lead concentrate quality to be impacted by talc flotation efficiency. Recent testwork demonstrated a better understanding of the level of talc in an expected process feed to avoid mis-representing the talc content of future samples. There is little reason to expect concentrates will be impaired by talc contamination as talc can be effectively removed from the base metal flotation process, mitigating the potential of talc diluting the base metal concentrates. Talc and fluorine levels will be managed by optimization of the talc pre-float circuit, effectively removing talc and fluorine to ensure the quality of the lead concentrate.

 

There are no outstanding metallurgical issues related to the production of a copper or zinc concentrate from all of the materials tested.

 

In the QP’s opinion, based on the summarized testwork and predictions made from that testwork in terms of mineralogy, plant design considerations, recovery forecasts, and presence of deleterious elements, the predictions of proposed throughput and metallurgical performance are adequate for the purposes used in the Report.

  
Arctic ProjectPage 172
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

11MINERAL RESOURCE ESTIMATES

 

11.1Introduction

 

In early 2022, Ambler Metals completed an update of the Arctic Mineral Resource model based on all available drill results through to the end of 2021 drilling campaign. Wood’s QP reviewed the model and visited the Arctic Property and core storage sites.

  

The current Mineral Resource was prepared by Ambler Metals using the following:

 

•Leapfrog software;

 

•Updated geological models including the talc model using the additional drill hole data collected from 2019 and 2021;

 

•Updated resource estimation using the additional drill hole data collected from 2019 and 2021 (see Table 11-1, and Section 11.3.3).

 

The Wood QP reviewed and validated the Mineral Resource model.

 

Composites and 3D solid models were constructed using Leapfrog commercial modelling software. The block model is setup in NAD 83 datum and extends a total of 1,910 m in the east-west direction, 1,950 m north-south, and 705 m in the vertical direction. The block model has a parent block size of 10 x 10 x 5 m with a sub-block size of 2 x 2 x 1 m.

 

The Mineral Resource estimate is accepted by Wood’s QP as being current as of November 30, 2022 and is in accordance with the with the standards and definitions required under S-K 1300.  

  

Table 11-1: List of Drill Holes used in 2022 Ambler Metals Resource Model that were Not Included in the 2020 SRK Model

 

Hole ID Geologic Model Resource Model Notes
AR19-0164 Yes Yes -
AR19-0165 Yes Yes -
AR19-0165a Yes Yes -
AR19-0166 Yes Yes -
AR19-0167 Yes Yes -
AR19-0168 Yes Yes -
AR19-0168a Yes Yes -
AR19-0169 Yes Yes -
AR19-0170 Yes Yes -
AR19-0171 Yes Yes -
AR19-0172 Yes Yes -
AR21-0173 Yes Yes -
AR21-0174 Yes Yes -

  
Arctic ProjectPage 173
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Hole ID Geologic Model Resource Model Notes
AR21-0175 Yes Partially missing talc information Talc samples are not interpreted to be in Minzones
AR21-0176 Yes Yes -
AR21-0177 Yes Yes -
AR21-0178 Yes Partially missing talc information Talc intercepts within Minzone
AR21-0179 Yes No -
AR21-0180 Yes Partially missing talc information Talc intercepts within Minzone 3
AR21-0181 Yes No -
AR21-0182 Yes Yes -
AR21-0183 Yes No -
AR21-0184 Yes No -
AR21-0185 Yes Yes -
AR21-0186 Yes Partially missing assays No assay data for Minzone 4, 3, 2.5, 2 and 1
AR21-0187 Yes Partially missing talc information Talc not currently in Minzone, this may change when assays are back
AR21-0188 Yes Partially missing assay information (only below 202.23 meters) No assay data for Minzone 3 and 5
AR21-0189 Yes No -
AR21-0190 Yes No -

 

11.2Drill Hole Database

 

Ambler Metals uses GeoSpark software for the drill hole logging data entries and management. Core logging data is entered directly to the GeoSpark software by core logging geologists, and the data is synchronized to the local server during the field season. After the field season is over, data validation is performed within the GeoSpark software, and the data is transferred to the master server.

 

For the current resource model, the cut-off date for the assay drill hole database is November 30, 2021. The assay database consists of collar, survey, assay, lithology, SG, geology, and geotechnical information. The assay database contains 171 drill holes with 3,224 assay samples, totalling 3,539.73 m.

 

At the assay cut-off date, out of 18 holes drilled in 2021, Ambler Metals had yet to receive assay results for six full holes and six partial holes due to heavy backlog at the assay laboratory.

  

Sample data for copper, lead, zinc, gold, and silver were extracted from this database for use in the generation of this resource estimate.

 

Individual sample intervals range from 0.08 m to 5.85 m in length and average 1.10 m. Drill hole sample interval protocol has varied throughout time at Arctic. Typically, shoulder samples were taken outside the mineralized zones up to 20 m.

 

Table 11-2 shows a summary statistic table of the raw assay.

  
Arctic ProjectPage 174
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Table 11-2: Summary Statistics of Assay Database, Length Weighted

 

Element   Unit   Count   Total Length
(m)
  Minimum   Maximum   Mean   Standard
Deviation
  Coefficient
of Variation
 
Ag   g/t   2,983   3,298   0.0   1,155.0   46.1   59.77   1.30  
As   ppm   1,891   2,131   0.6   10,000.0   1,028.1   1,837.60   1.79  
Au   g/t   2,841   3,141   0.00   32.80   0.66   1.60   2.43  
Cd   ppm   1,891   2,131   0.08   1,000.00   198.52   247.27   1.25  
Cu   %   3,000   3,324   0.00   31.00   2.92   3.13   1.07  
Fe   %   1,891   2,131   0.37   32.10   9.69   6.69   0.69  
Hg   ppm   1,176   1,068   0.0   43.9   1.9   2.74   1.47  
Pb   %   2,935   3,246   0.00   21.80   0.86   1.59   1.84  
S   %   1,890   2,130   0.01   30.70   6.14   4.50   0.73  
Sb   ppm   1,891   2,131   0.2   5,210.0   192.3   352.31   1.83  
SG   -   3,184   3,540   2.01   4.99   3.29   0.36   0.11  
Zn   %   2,974   3,294   0.00   30.00   3.95   4.96   1.26  

 

The distribution of copper grades in drill holes proximal to the Arctic deposit is shown from two cross section maps in Figure 11-1.

  
Arctic ProjectPage 175
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Figure 11-1: East-West Cross Section for Copper Drill Hole Data, Looking North (Resource pit depicted in red)

 

 

 

 

Source: Ambler Metals, 2022.

  
Arctic ProjectPage 176
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

South32 developed and provided Ambler Metals with an algorithm to calculate talc proxy. The algorithm was applied in the database in 2019 and 2021. The algorithm uses the multi element assay results, mainly Mg, Al and K for the data from 1968 to 2017, and the four-acid digest-ICPMS data collected between 2004 to 2017 and generated calculated talc percent proxy values in the database. The algorithm was applied in the 2021 database to create talc model wireframes and estimate talc grades within the model.

 

11.3Interpretations and Geological Modelling Procedures

 

11.3.1Lithology Modelling

 

In 2019, SRK revised three-dimensional (3D) geological model wireframes generated by Trilogy in 2017. The geological model updates were completed using Leapfrog Geo software. In October of 2021, Ambler further updated the 2019 geological model wireframes using drilling information collected during 2019 and 2021 drilling campaign. Figure 11-2 shows East-West cross-section map of the modelled Arctic geological wireframes including mineralized zones (Minzones). The main lithological units in the Arctic deposit are shown in Table 11-3.

 

Figure 11-2: East-West Cross-Section of the Arctic Geological Model, Looking North

 

 

Source: Ambler Metals, 2022.

  
Arctic ProjectPage 177
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Table 11-3: Arctic Lithological Units

 

Lithological Unit Codes Lithological Name
QMS Series of felsic quartz mica schists
MRP Meta-rhyolite porphyry
GS Grey schist of the carbonaceous schists
AMR Aphanitic meta-rhyolite

 

11.3.2Talc Modelling

 

Three-dimensional talc model wireframes were generated using the updated talc proxy database using the algorithm provided by South32 by capturing high-grade and low-grade talc intervals. Samples that showed talc proxy percentages above 0% were included in the talc zones. Figure 11-3 shows an East-West cross-section map of the modelled Arctic talc wireframes (green).

 

Figure 11-3: East-West Cross-Section of Talc Model Wireframes, Looking North

 

 

 

Source: Ambler Metals, 2022.

  
Arctic ProjectPage 178
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

11.3.3Mineralization Domains

 

The mineralized zone (Minzones) wireframes were updated using new assay data, typically using the 0.5% CuEq cut-off grade, as a guide where data is available. Drill holes that did not have assay results received by the assay database cut-off date were used to update the geological model but not used in the resource model. For these holes, the geological model was updated using the geology logging data to update the mineralized zone wireframes. Only minor revisions of the wireframes were made to the main mineralized zones (Zones 1, 1a, 2, 2.5, 3, 3_sub, 4 and 5) compared to the previous model. The main mineralized zones are Zones 1, 3, and 5. A cross section of mineralized zone wireframes, with estimation domain group and individual domain names, are shown in Figure 11-4. Table 11-4 shows mineralized zone domain codes used in the resource model.

 

Figure 11-4: East-West Cross-Section of the Arctic Deposit Showing Mineralized Zones

 

 

 

Source: Ambler Metals, 2022.

  
Arctic ProjectPage 179
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Table 11-4: Summary of Mineralized Zone Domains

 

Leapfrog Minzone Domain Estimation Domain
1 Zone 1 Bottom Group
1cz_sub Zone 1 a Bottom Group
2 Zone 2 Bottom Group
2.5 Zone 2.5 Bottom Group
3b Zone 3 Mid Group
3by_sub Zone 3a Mid Group
4 Zone 4 Top Group
5cx Zone 5 Top Group
7 Zone 7b Top Group
7a Zone 7c Top Group
7a_hw Zone 7a hw Top Group
7b_hw Zone 7b hw Top Group
7hw Zone 7c hw Top Group
7_sub Zone 7a Top Group
8 Zone 8c Top Group
8a Zone 8d Top Group
8_sub Zone 8b Top Group
8_subA Zone 8a Top Group

 

11.4Exploratory Data Analysis

 

11.4.1Specific Gravity

 

SG database includes a total of 12,088 SG values, with 3,497 measured SG values and the rest are predicted and assigned values, ranging from 2.01 to 4.99 with average sample length of 2.33 m.

 

Prior to 2019, SG measurement at Arctic was inconsistent and the SG database contained many missing SG intervals, especially within the mineralized zones. In 2019, SRK provided a solution to fill the missing SG intervals by using the Random Forest Regressor to predict SG values in the mineralized zones. Outside of the mineralized zones, within non mineralized lithological units where SG data was not available, Ambler assigned an SG value of 2.78.

 

Since 2019, Ambler Metals collected SG values at a regular interval from both inside and outside of the mineralized zones and it was no longer necessary to use the Random Forest Regressor.

  
Arctic ProjectPage 180
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

From 2019, SG measurements were taken using half cut core and taking dry and water submerged weights to calculate SG value. From 2011 to 2017, SG measurements were taken on whole core prior to cutting. Ambler Metals updated the existing SG database created by SRK with predicted SG values in 2021 with SG measurements collected since 2019.

 

SG was estimated in all mineralized zones and lithologies.

 

Table 11-5 shows summary statistics of SG by Minzone.

 

Wood reviewed 1,850 measured SG values with Random Forest predicted values in the SG database to assess for bias. Table 11-6 shows that there is no significant difference between the means of the measured and predicted SG values, however, the standard deviation of the predicted SG value is slightly smaller. Correlation coefficient of the measured and predicted SG values is 0.930.

 

Table 11-7 shows average measured and predicted SG values within selected bins of measured SG values. A low bias in the predicted SG values is observed and only exceed 5% bias for SG values below 2.7 and above 3.7. Table 11-5 shows that the proportion of blocks with estimated SG below 2.7 and above 3.7 is less than 1%. Small number of samples and number of blocks affected by this is not expected to have any material impact. A capping strategy was used during estimation process of SG values to control the impact of the extreme SG values. No other corrections in the predicted SG were applied for the current resource estimate.

 

Table 11-5: Summary Statistics for SG by Mineralized Zone

 

Minzone   Count   Mean   Min   Max  
Zone 1   646   3.36   2.70   4.96  
Zone 1a   36   3.12   2.75   3.32  
Zone 2   145   3.29   2.74   4.63  
Zone 2.5   89   3.24   2.75   4.39  
Zone 3   762   3.24   2.50   4.46  
Zone 3a   4   3.32   3.31   3.32  
Zone 4   222   3.24   2.70   4.43  
Zone 5   849   3.36   2.01   4.99  
Zone 7a   12   2.93   2.71   3.32  
Zone 7b   32   3.12   2.80   4.00  
Zone 7c   8   3.03   2.73   3.32  
Zone 7a HW   30   2.99   2.70   3.32  
Zone 7b HW   21   2.97   2.72   3.32  
Zone 7c HW   33   3.06   2.73   3.32  
Zone 8a   4   3.32   3.32   3.32  
Zone 8b   5   3.31   3.31   3.32  
Zone 8c   44   3.06   2.72   3.32  
Zone 8 HW   7   3.32   3.31   3.32  

 

  
Arctic ProjectPage 181
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Table 11-6: Summary Statistics for SG Measured and SG Predicted

 

    Number of Data   Mean   Min   Max   Std. Dev  
SG Measured   1,849   3.05   2.56   4.99   0.20  
SG Predicted   1,849   3.06   2.65   4.38   0.16  

 

Table 11-7: Mean SG Values for Measured and Predicted by Bins

 

        Mean      
Number of Data   Target SG Value   Measured SG   Predicted SG   % Difference  
5   2.5   2.589   2.708   5%  
754   2.7   2.746   2.788   2%  
238   3   2.982   3.045   2%  
118   3.2   3.2   3.249   2%  
97   3.5   3.49   3.446   -1%  
80   3.7   3.701   3.614   -2%  
64   4   4.01   3.822   -5%  
48   4.1   4.305   4.054   -6%  
18   4.3   4.472   4.208   -6%  
8   4.6   4.574   4.279   -6%  

  
Arctic ProjectPage 182
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Figure 11-5: Cumulative Probability Plot for SG in the Resource Block Model

 

 

Source: Wood, 2022

 

11.4.2Compositing

 

The raw assay database was weighted using SG, meaning the weighted sample length equals sample length times SG times grade. Weighting composites by SG accounts for density having a positive correlation to grade in massive sulphide mineralization. The weighted assays were composited into 2-m intervals broken by lithology and mineralized zones. Residual composites that are less than 1 m were distributed equally into composites that are in the same domain.

 

Figure 11-6 shows a histogram of composite length, with 1.9 m as the average length of the composite.

 

Table 11-8 shows summary statistics of the composite database by mineralized zone.

  
Arctic ProjectPage 183
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Figure 11-6: Histogram of Composite Lengths

 

 

Source: Ambler, 2022.

 

Table 11-8: Summary Statistics of the Composite Database

 

Element   Unit   Count   Total Length
(m)
  Minimum   Maximum   Mean   Standard
Deviation
  Coefficient
of Variation
 
Ag   g/t   1,747   3,328   0.0   578.9   46.5   47.71   1.03  
As   ppm   1,123   2,152   2.1   10,000.0   1,032.7   1,614.66   1.56  
Au   g/t   1,685   3,219   0.00   28.08   0.66   1.32   1.99  
Cd   ppm   1,123   2,152   0.08   1,000.00   201.58   208.44   1.03  
Cu   %   1,753   3,339   0.00   16.35   2.94   2.61   0.89  
Fe   %   1,123   2,152   0.37   27.77   9.78   5.85   0.60  

  
Arctic ProjectPage 184
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Element   Unit   Count   Total Length
(m)
  Minimum   Maximum   Mean   Standard
Deviation
  Coefficient
of Variation
 
Hg   ppm   563   1,077   0.0   13.4   1.9   2.11   1.11  
Pb   %   1,738   3,311   0.00   17.65   0.88   1.35   1.54  
S   %   1,122   2,151   0.01   28.57   6.19   3.94   0.64  
Sb   ppm   1,123   2,152   0.2   2,293.9   192.9   290.37   1.50  
SG   -   1,860   3,540   2.51   4.60   3.30   0.34   0.10  
Zn   %   1,749   3,333   0.00   24.10   3.97   4.14   1.04  

 

11.4.3Grade Capping

 

Probability plots of declustered data (by polygonal) and sensitivity curves were assessed in determining an appropriate capping value for all economic elements and specific gravity in each of the mineralized zones and lithological domains. The capping values used in the current model are the same as the values determined in the previous SRK model and are shown in Table 11-9. Summary statistics comparing mean values before and after the capping values are applied is shown in Table 11-10 for payable metals, and Table 11-11 for non-payable metals.

 

11.4.4Spatial Analysis

 

Experimental and modelled variograms were generated using 2m capped composites to analyse the spatial continuity of mineralization within all mineralized zones. Mineralized zones define the resource estimation domains. Mineralized zones are combined into three groups (bottom, middle, and top) for the variogram analysis. Non-mineralized lithological units are combined into a single group, and the high-grade talc zones are also merged into a single group for the same purpose.

 

Table 11-12 summarizes the estimation domains. Figure 11-7 shows a cross-section of grouped estimation domains.

 

The composites for each combined mineralized zone were unfolded into 2D flattened space for experimental and modelling variograms and final variogram models are reported in GSLib format. Table 11-13 to Table 11-16 show modelled variogram model parameters used in the grade estimations.

  
Arctic ProjectPage 185
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Table 11-9: Capping Values

 

Minzone/Lithology   Capping Values  
  Cu
(%)
  Pb
(%)
  Zn
(%)
  Au
(g/t)
  Ag
(g/t)
  SG   As
(ppm)
  Sb
(ppm)
  Cd
(ppm)
  Hg
(ppm)
  Fe
(%)
  S
(%)
 
Zone 1, 1a   8.0   3.00   14.00   2.5   150   4.5   7,000   1,000   800   7.0   25.0   10.0  
Zone 2   6.0   2.80   11.00   2.5   110   4.5   4,000   1,000   600   4.0   20.0   10.0  
Zone 2.5   6.0   2.50   8.00   0.6   90   4.0   1,000   700   400   5.0   20.0   10.0  
Zone 3, SubZone 3   10.0   3.50   16.00   1.5   125   5.0   7,000   1,000   800   5.0   22.0   10.0  
Zone 4   10.0   1.75   13.00   1.5   150   5.0   4,000   400   525   3.0   20.0   10.0  
Zone 5   11.0   3.50   14.00   5.0   150   5.0   5,000   1,000   750   6.0   22.0   10.0  
SubZone 7a, 7b, 7c, 7a HW, 7b HW, 7c HW   2.0   1.00   3.50   0.7   30   3.5   500   300   400   7.0   8.0   5.0  
SubZone 8a, 8b, 8c, 8d, 8c HW   1.2   1.00   4.50   0.8   70   5.0   200   300   200   10.0   8.0   5.0  
Aphanitic Meta-Rhyolite, Meta-Rhyolite Porphyry   0.1   0.10   0.20   0.2   9   3.1   200   30   15   0.3   7.5   9.5  
Grey Schist   0.5   0.20   0.75   0.5   10   3.1   900   100   30   0.5   7.0   9.5  
Quartz Mica Schist   0.8   0.50   0.75   0.5   15   3.1   1,000   100   75   2.0   10.0   9.5  

  
Arctic ProjectPage 186
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Table 11-10: Summary Statistics of Uncapped and Capped Values for Payable Metal

 

Zone/
Lithology
  Mean   Mean   Mean   Mean   Mean  
  Cu (%)   Pb (%)   Zn (%)   Au (ppm)   Ag (ppm)  
  Uncapped   Capped   Uncapped   Capped   Uncapped   Capped   Uncapped   Capped   Uncapped   Capped  
Zone 1   2.80   2.76   0.83   0.74   4.12   4.03   0.76   0.73   53.3   51.1  
Zone 1a   0.73   0.73   0.54   0.34   1.96   1.82   0.25   0.25   17.5   17.5  
Zone 2   2.19   2.08   0.63   0.61   3.30   3.19   0.78   0.62   43.3   40.0  
Zone 2.5   1.97   1.90   0.59   0.54   3.20   2.93   0.29   0.26   29.8   29.1  
Zone 3   3.11   3.08   0.86   0.77   3.83   3.81   0.39   0.37   38.1   36.6  
Zone 3a   1.38   1.38   1.06   1.06   6.46   6.46   0.00   0.00   24.7   24.7  
zone 4   2.71   2.62   0.90   0.57   3.46   3.29   0.53   0.51   45.2   42.3  
Zone 5   3.67   3.65   1.18   1.03   4.93   4.87   0.95   0.78   58.0   54.7  
Zone 7a   0.22   0.22   0.07   0.07   0.20   0.20   0.22   0.20   5.2   5.2  
Zone 7b   0.60   0.49   0.52   0.17   2.05   0.84   0.24   0.20   15.9   9.2  
Zone 7c   0.62   0.62   0.04   0.04   0.44   0.44   0.20   0.20   5.6   5.6  
Zone 7a HW   0.24   0.19   0.02   0.02   0.17   0.17   0.02   0.02   4.9   3.0  
Zone 7b HW   0.09   0.09   0.02   0.02   0.21   0.21   0.03   0.03   1.4   1.4  
Zone 7c HW   0.10   0.10   0.02   0.02   0.13   0.13   0.03   0.03   1.8   1.8  
Zone 8a   0.58   0.58   0.21   0.21   2.90   2.90   0.60   0.60   14.2   14.2  
Zone 8b   1.16   0.73   0.85   0.56   3.95   2.31   0.32   0.32   29.4   29.4  
Zone 8c   0.36   0.23   0.22   0.20   1.00   0.83   0.26   0.19   7.9   7.9  
Zone 8 HW   0.70   0.70   0.89   0.72   2.09   2.09   1.30   0.37   115.0   41.8  

  
Arctic ProjectPage 187
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Table 11-11: Summary Statistics of Uncapped and Capped Values for Deleterious Elements

 

Zone/
Lithology
  Mean   Mean   Mean   Mean   Mean   Mean  
  As ppm   Sb ppm   Cd ppm   Hg ppm   Fe %   S %  
  Uncapped   Capped   Uncapped   Capped   Uncapped   Capped   Uncapped   Capped   Uncapped   Capped   Uncapped   Capped  
Zone 1   1275.2   1251.7   276.8   264.7   192.91   191.03   2.3   2.2   11.29   11.25   6.58   6.50  
Zone 1a   244.5   246.1   96.6   96.6   111.68   102.64   2.0   1.6   5.91   5.91   4.52   4.52  
Zone 2   939.4   810.5   266.6   241.4   160.18   158.07   1.2   1.1   8.70   8.62   5.26   5.17  
Zone 2.5   403.5   325.2   158.1   126.0   169.01   160.17   1.6   1.4   9.95   9.49   6.44   6.38  
Zone 3   1074.6   1048.7   123.7   119.8   212.05   211.35   1.1   1.1   9.27   9.18   5.69   5.54  
Zone 3a   0.0   0.0   0.0   0.0   0.00   0.00   0.0   0.0   0.00   0.00   0.00   0.00  
zone 4   1169.2   912.9   103.4   88.1   179.17   173.39   1.4   1.2   8.19   8.16   4.96   4.68  
Zone 5   1101.6   1061.3   222.4   213.6   261.36   258.50   2.5   2.5   10.93   10.82   7.53   6.84  
Zone 7a   128.1   128.1   68.8   68.8   13.94   13.94   0.6   0.6   4.71   4.71   3.81   3.81  
Zone 7b   214.2   196.1   105.0   70.8   117.17   68.43   3.8   2.6   6.06   5.04   4.54   3.93  
Zone 7c   209.2   209.2   75.7   75.7   22.07   22.07   1.4   1.4   3.76   3.76   3.08   3.08  
Zone 7a HW   26.6   26.6   11.0   11.0   7.40   7.40   0.9   0.9   2.80   2.77   0.80   0.68  
Zone 7b HW   50.8   50.2   1.6   1.6   3.16   3.16   0.3   0.3   2.17   2.17   0.58   0.58  
Zone 7c HW   64.9   64.9   20.5   20.5   7.23   7.23   0.8   0.7   2.67   2.67   0.74   0.70  
Zone 8a   0.0   0.0   0.0   0.0   0.00   0.00   0.0   0.0   0.00   0.00   0.00   0.00  
Zone 8b   42.3   42.3   19.2   19.2   40.00   40.00   2.2   2.2   3.58   3.58   1.22   1.22  
Zone 8c   154.5   76.6   106.2   66.9   19.55   19.55   1.4   1.4   4.84   4.23   2.07   1.90  
Zone 8 HW   0.0   0.0   0.0   0.0   0.00   0.00   0.0   0.0   0.00   0.00   0.00   0.00  

  
Arctic ProjectPage 188
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Table 11-12: Estimation Domains

 

Estimation Domain Minzones or Lithologies
Bottom Group 1, 1a, 2, and 2.5
Mid Group 3, and 3a
Top Group 4, 5, 7a, 7b, 8c, 8a, 8b, 8c, 8 hw, 7a hw, 7b hw, 7c hw
Talc All high-grade talc zones
Lithology (Outside of Minzone) All non-mineralized lithologies

 

Figure 11-7: Cross-Section of Estimation Domains and Talc

 

 

 

Source: Ambler Metals, 2022.

  
Arctic ProjectPage 189
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Table 11-13: Variogram Models for the Bottom Group

 

Bottom Group Variograms  
    Variogram Model   GSLIB Angles  
Variable   Nugget   Str. No.   Type   CC   X Range
(m)
  Y Range
(m)
  Z Range
(m)
  ANG1
(degree)
  ANG2
(degree)
  ANG3
(degree)
 
Cu   0.10   1   Exponential   0.50   30   70   7.5   30   0   0  
    2   Spherical   0.40   20   200   8.0        
Pb   0.15   1   Exponential   0.50   30   50   7.5   30   0   0  
    2   Spherical   0.35   220   180   10.0        
Zn   0.15   1   Exponential   0.55   40   60   9.0   30   0   0  
    2   Spherical   0.30   240   200   9.0        
Ag   0.15   1   Exponential   0.45   30   75   6.0   30   0   0  
    2   Spherical   0.43   240   180   12.0        
Au   0.15   1   Exponential   0.30   30   40   12.0   30   0   0  
    2   Spherical   0.55   180   140   12.0        
SG   0.05   1   Exponential   0.60   30   60   9.0   30   0   0  
    2   Spherical   0.35   250   20   12.0        
As   0.15   1   Exponential   0.40   40   60   9.0   30   0   0  
    2   Spherical   0.45   26   200   12        
Cd   0.20   1   Exponential   0.65   55   55   9.0   30   0   0  
    2   Spherical   0.15   200   200   9.0        
Fe   0.15   1   Exponential   0.50   40   55   10.5   30   0   0  
    2   Spherical   0.35   250   200   10.5        
Hg   0.20   1   Exponential   0.65   75   75   9.0   30   0   0  
    2   Spherical   0.15   200   200   12.0        
SG   0.10   1   Exponential   0.60   24   51   10.5   30   0   0  
    2   Spherical   0.30   250   200   12.0        
Sb   0.15   1   Exponential   0.48   30   57   12.0   30   0   0  
    2   Spherical   0.37   220   200   15.0        

  
Arctic ProjectPage 190
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Table 11-14: Variogram Models for the Middle Group

 

Middle Group Variograms  
    Variogram Model   GSLIB Angles  
Variable   Nugget   Str. No.   Type   CC   X Range
(m)
  Y Range
(m)
  Z Range
(m)
  ANG1
(degree)
  ANG2
(degree)
  ANG3
(degree)
 
Cu   0.15   1   Exponential   0.65   21   21   12.0   60   0   0  
    2   Spherical   0.20   180   140   12.0        
Pb   0.15   1   Exponential   0.62   39   21   12.0   60   0   0  
    2   Spherical   0.23   220   160   15.0        
Zn   0.15   1   Exponential   0.65   60   24   10.5   60   0   0  
    2   Spherical   0.20   220   160   15.0        
Ag   0.15   1   Exponential   0.50   30   21   12.0   60   0   0  
    2   Spherical   0.35   230   150   18.0        
Au   0.10   1   Exponential   0.45   30   21   15.0   60   0   0  
    2   Spherical   0.45   240   160   20.0        
SG   0.05   1   Exponential   0.20   20   20   12.0   60   0   0  
    2   Spherical   0.75   240   160   20.0        
As   0.20   1   Exponential   0.30   75   50   12.0   60   0   0  
    2   Spherical   0.50   240   160   20.0        
Cd   0.15   1   Exponential   0.50   24   49   7.5   60   0   0  
    2   Spherical   0.35   220   140   9.0        
Fe   0.10   1   Exponential   0.30   39   21   9.0   60   0   0  
    2   Spherical   0.60   240   160   20.0        
Hg   0.15   1   Exponential   0.50   39   21   7.5   60   0   0  
    2   Spherical   0.35   240   160   8.0        
SG   0.10   1   Exponential   0.15   39   21   6.0   60   0   0  
    2   Spherical   0.75   22   160   12.0        
Sb   0.05   1   Exponential   0.20   39   21   12.0   60   0   0  
    2   Spherical   0.75   240   180   18.0        

  
Arctic ProjectPage 191
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Table 11-15: Variogram Models for the Top Group

 

Top Group Variograms  
    Variogram Model   GSLIB Angles  
Variable   Nugget   Str. No.   Type   CC   X Range
(m)
  Y Range
(m)
  Z Range
(m)
  ANG1
(degree)
  ANG2
(degree)
  ANG3
(degree)
 
Cu   0.05   1   Exponential   0.60   45   33   6.0   60   0   0  
    2   Spherical   0.35   250   160   9.0        
Pb   0.05   1   Exponential   0.55   45   30   4.5   60   0   0  
    2   Spherical   0.40   240   180   9.0        
Zn   0.20   1   Exponential   0.60   45   33   6.0   60   0   0  
    2   Spherical   0.20   250   160   9.0        
Ag   0.10   1   Exponential   0.50   45   33   6.0   60   0   0  
    2   Spherical   0.40   250   180   9.0        
Au   0.30   1   Exponential   0.50   36   36   6.0   60   0   0  
    2   Spherical   0.20   250   200   12.0        
SG   0.00   1   Exponential   0.50   45   45   6.0   60   0   0  
    2   Spherical   0.50   220   160   13.0        
As   0.15   1   Exponential   0.24   45   33   6.0   60   0   0  
    2   Spherical   0.61   250   160   12.0        
Cd   0.15   1   Exponential   0.30   45   33   4.5   60   0   0  
    2   Spherical   0.55   250   160   12.0        
Fe   0.20   1   Exponential   0.15   36   30   6.0   60   0   0  
    2   Spherical   0.65   240   160   12.0        
Hg   0.10   1   Exponential   0.70   105   105   6.0   60   0   0  
    2   Spherical   0.20   250   250   9.0        
SG   0.15   1   Exponential   0.35   45   33   7.5   60   0   0  
    2   Spherical   0.50   250   160   12.0        
Sb   0.05   1   Exponential   0.65   45   33   7.5   60   0   0  
    2   Spherical   0.30   250   160   12.0        

  
Arctic ProjectPage 192
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Table 11-16: Variogram Model for Talc

 

Talc Variograms  
    Variogram Model   GSLIB Angles  
Variable   Nugget   Str. No.   Type   CC   X Range
(m)
  Y Range
(m)
  Z Range
(m)
  ANG1
(degree)
  ANG2
(degree)
  ANG3
(degree)
 
Talc   0.10   1   Exponentia   0.55   75   50   10   220   -23   0  
    2   Spherical   0.35   150   80   30        

 

11.4.5Block Model Setup

 

The non-rotated block model was set up in UTM coordinate system, Zone 4, NAD 83 datum. The block model has a parent block size of 10 x 10 x 5 m with a sub-block size of 2 x 2 x 1 m. Table 11-17 shows the Arctic block model parameters.

 

The original sub-block model was regularized to 5 x 5 x 5 m for the Reserve estimation.

 

Table 11-17: Arctic Block Model Parameters

 

Block Size (m)   Model Origin UTM   Boundary Size      
Axis   Parent   Sub   Bottom Left Corner   (m)   No. of Parent Blocks  
X   10   2   612,190   1,910   191  
Y   10   2   7,452,095   1,950   195  
Z   5   1   345   705   141  
Rotation   Dip (degree)
 Azi. (degree)
 

0

0

  -  

 

 

11.5Mineral Resource Estimation

 

Inside mineralized zones, payable metals (Cu, Zn, Pb, Ag and Au), deleterious elements, and SG were estimated using ordinary kriging (OK) in three passes with increasing search ellipsoid sizes. Talc was also estimated in the high-grade talc zones using OK with three passes. Outside of mineralized zones, payable metals, deleterious elements, and SG were estimated using inverse distance to the power of two (ID2) with three passes. Sub-blocks receive the estimated grade values of parent blocks. Each mineralized zone is treated as hard boundaries, meaning that the data from one mineralized zone was not used to estimate grades in other zones. Table 11-18 to Table 11-21 show search ellipsoid sizes, and minimum and maximum number of composites used for the block grade estimations.

  
Arctic ProjectPage 193
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Table 11-18:Search Ellipsoid Parameters Used for Payable Metals (Cu, Zn, Ag, and Au)

 

Search Parameters Payable Metals  
      Search Distances   Composites   Octants  
Minzone/
Lithology
  Method   Pass   Y (m)   X (m)   Z (m)   Min   Max   Max Per DDH*   Min   Min Comps   Max Comps  
Bottom Group   Ordinary Kriging with LVA**   1   125   100   6   3   12   2   2   1   2  
    2   250   200   12   3   16   2   2   1   2  
    3   750   600   36   1   21   2   -   -   -  
Mid Group   Ordinary Kriging with LVA   1   130   80   9   3   12   2   2   1   2  
    2   260   160   18   3   16   2   2   1   2  
    3   780   480   54   1   21   2   -   -   -  
Top Group   Ordinary Kriging with LVA   1   130   90   6   3   12   2   2   1   2  
    2   260   180   12   3   16   2   2   1   2  
    3   780   540   36   1   21   2   -   -   -  
Lithologies   Inverse Distance squared with LVA   1   125   90   7   3   12   2   2   1   2  
    2   250   180   14   2   16   2   2   1   2  
    3   750   540   42   1   21   2   -   -   -  
Talc   Ordinary Kriging with LVA   1   200   100   35   3   12   2   -   -   -  
    2   400   200   70   3   16   2   -   -   -  
    3   4,000   2,000   700   1   21   2   -   -   -  
                                                   

*DDH: Diamond Drill Hole

 

**LA: Locally Varying Anisotropy

  
Arctic ProjectPage 194
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Table 11-19:Search Ellipsoid Parameters Used for Deleterious Elements

 

Search Parameters Deleterious Elements  
        Search Distances   Composites   Capped   Octants  
Minzone/
Lithology
  Method   Pass   Y (m)   X (m)   Z (m)   Min   Max   Max Per DDH     Min   Min Comp   Max Comp  
Bottom Group   Ordinary Kriging with LVA   1   45   60   6   3   12   2   No   -   -   -  
    2   90   120   12   2   16   2   No   -   -   -  
    3   780   600   36   1   21   2   Yes   -   -   -  
Mid Group   Ordinary Kriging with LVA   1   45   30   9   3   12   2   No   -   -   -  
    2   90   60   18   2   16   2   No   -   -   -  
    3   780   480   54   1   21   2   Yes   -   -   -  
Top Group   Ordinary Kriging with LVA   1   60   45   6   3   12   2   No   -   -   -  
    2   120   90   12   2   16   2   No   -   -   -  
    3   780   510   36   1   21   2   Yes   -   -   -  
Lithologies   Inverse Distance squared with LVA   1   60   45   6   3   12   2   No   -   -   -  
    2   120   90   12   2   16   2   No   -   -   -  
    3   780   510   36   1   21   2   Yes   -   -   -  

 

Table 11-20:Search Ellipsoid Parameters Used for Talc

 

Search Parameters Talc  
        Search Distances   Composites   Octants  
Minzone/
Lithology
  Method   Pass   Y (m)   X (m)   Z (m)   Min   Max   Max Per DDH   Min   Min Comp   Max Comp  
Talc   Ordinary Kriging with LVA   1   200   100   35   3   12   2   -   -   -  
    2   400   200   70   3   16   2   -   -   -  
    3   4,000   2,000   700   1   21   2   -   -   -  

  
Arctic ProjectPage 195
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Table 11-21:Search Ellipsoid Parameters Used for SG

 

Search Parameters Specific Gravity  
        Search Distances   Composites   Octants  
Minzone/
Lithology
  Method   Pass   Y (m)   X (m)   Z (m)   Min   Max   Max Per DDH   Min   Min Comp   Max Comp  
Bottom Group   Ordinary Kriging with LVA   1   130   100   6   2   12   -   -   -   -  
    2   260   200   12   1   15   -   -   -   -  
    3   780   600   36   1   15   -   -   -   -  
Mid Group   Ordinary Kriging with LVA   1   130   80   9   2   12   -   -   -   -  
    2   260   160   18   1   15   -   -   -   -  
    3   780   480   54   1   15   -   -   -   -  
Top Group   Ordinary Kriging with LVA   1   115   85   6   2   12   -   -   -   -  
    2   230   170   12   1   15   -   -   -   -  
    3   690   510   36   1   15   -   -   -   -  
Lithologies   Inverse Distance squared with LVA   1   125   90   7   2   12   -   -   -   -  
    2   250   180   14   1   15   -   -   -   -  
    3   750   540   42   1   15   -   -   -   -  

  
Arctic ProjectPage 196
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Locally Varying Anisotropy (LVA) was used to orient search ellipsoids at each block centroid location. The LVA parameters were calculated using each mineralized zone top and bottom surfaces. Table 11-10 shows search ellipsoids, at two different block locations, oriented by LVA parameters at each location following the orientation of the mineralized Zone 5 wireframes used for Cu estimation within the mineralized Zone 5.

 

Figure 11-8:LVA Search Ellipsoids Used in Minzone 5 (Red, Top Group) for Cu Estimation

 

(GRAPHIC) 

 

Source: Ambler Metals, 2022.

 

11.5.1Validation

 

11.5.1.1Visual Inspection

 

A detailed visual inspection of the block model was conducted in both section and plan to compare estimated grades against underlying sample data. This included confirmation of the proper coding of blocks within the respective domains.

 

Figure 11-9 to Figure 11-13 show East-West cross-section maps for the payable metals block grade and composite database used for the estimation. In general, globally, block estimates compared well with composites.

  
Arctic ProjectPage 197
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Figure 11-9:East-West Cross-Section for Cu Block Model and Composite Data, Looking North (Resource pit depicted in red)

 

 

 

Source: Ambler Metals, 2022.

 

Figure 11-10:East-West Cross-Section for Zn Block Model and Composite Data, Looking North (Resource pit depicted in red)

 

(GRAPHIC) 

 

Source: Ambler Metals, 2022.

  
Arctic ProjectPage 198
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Figure 11-11:East-West Cross-Section for Pb Block Model and Composite Data, Looking North (Resource pit depicted in red)

 

 

Source: Ambler Metals, 2022.

 

Figure 11-12:East-West Cross-Section for Ag Block Model and Composite Data, Looking North (Resource pit depicted in red)

 

 

 

Source: Ambler Metals, 2022.

  
Arctic ProjectPage 199
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Figure 11-13:East-West Cross-Section for Au Block Model and Composite Data, Looking North (Resource pit depicted in red)

 

 

 

Source: Ambler Metals, 2022.

 

11.5.1.2Statistical Validation

 

Comparing the basic statistics of the OK block model with the Nearest Neighbour (NN) model help quantify whether the estimate is over or underestimated. In general, Wood considers differences of less than five percent between the two models mean grades is reasonable for validating global grade bias.

 

Summary statistics of payable metal mean grades for the main mineralized zones (Zones 1, 3, and 5) are shown in Table 11-22. Globally, the models validate well as OK estimated block model mean grades and declustered composites (the nearest neighbours model) means are close except for some smaller domains. These smaller domains were estimated with a small number of samples, which needs further investigation. In other minor mineralized domains, some domains show larger differences due to the lack of supporting drill hole data.

 

11.5.1.3Swath Plots

 

Swath plots are used to detect any spatial-geographical bias in an estimated model. Plots compare average grades of the NN and estimated models over swaths that are typically one block wide in all directions.

 

The estimated models (ID2 and OK) and NN estimates swaths should follow the same trend with the NN plot typically experiencing higher highs and lower lows than the smoother estimated models. In areas where there are large discrepancies or deviations from each other, the models should be further investigated to determine the reason and modify as required.

  
Arctic ProjectPage 200
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

There is good correspondence between the models in most areas. The validation results indicate that the OK model is a reasonable reflection of the underlying sample data.

 

Figure 11-14 to Figure 11-18 show swath plots for the payable metals for the main mineralized zones (zone 1, 3 and 5).

  
Arctic ProjectPage 201
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Table 11-22:Statistics of OK and NN for Payable Metals for the Main Mineralized Zones

 

        Mean Cu
(%)
  Mean Pb
(%)
  Mean Zn
(%)
  Mean Au
(g/t)
  Mean Ag
(g/t)
 
Minzone   No. of Blocks   OK   NN   % Diff   OK   NN   % Diff   OK   NN   % Diff   OK   NN   % Diff   OK   NN   % Diff  
Zone 1   693,631   2.587   2.448   -5   0.736   0.694   -6   3.860   3.636   -6   0.706   0.661   -6   50.022   47.206   -6  
Zone 3   870,408   2.801   2.759   -2   0.684   0.657   -4   3.565   3.494   -2   0.314   0.323   3   33.120   33.283   0  
Zone 5   930,886   3.451   3.287   -5   1.016   0.982   -3   4.808   4.394   -9   0.723   0.709   -2   51.867   50.029   -4  

  
Arctic ProjectPage 202
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Figure 11-14:Cu Swath Plot, OK (Red), NN (Green) and Composite (Black), North-South Direction

 

(GRAPHIC) 

 

Source: Ambler Metals, 2022.

  
Arctic ProjectPage 203
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Figure 11-15:Pb Swath Plot, OK (Red), NN (Green) and Composite (Black), North-South Direction

 

(GRAPHIC)

 

Source: Ambler Metals, 2022.

  
Arctic ProjectPage 204
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Figure 11-16:Zn Swath Plot, OK (Red), NN (Green) and Composite (Black), North-South Direction

 

(GRAPHIC) 

 

Source: Ambler Metals, 2022.

  
Arctic ProjectPage 205
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Figure 11-17:Ag Swath Plot, OK (Red), NN (Green) and Composite (Black), North-South Direction

 

(GRAPHIC) 

 

Source: Ambler Metals, 2022.

  
Arctic ProjectPage 206
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Figure 11-18:Au Swath Plot, OK (Red), NN (Green) and Composite (Black), North-South Direction

 

(GRAPHIC) 

 

Source: Ambler Metals, 2022.

 

11.5.1.4Validation of Block Model with the New Drill Holes

 

Wood reviewed the new drilling data collected after the closing of the database for the current mineral resource model by displaying copper grades for both the drill holes and the current block model in East-West cross sections.

 

Copper grades in the new drill holes match well with the current block model copper grades visually and confirm mineralization zones defined.

 

  
Arctic ProjectPage 207
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

11.5.2Mineral Resource Classification

 

The Mineral Resources were classified in accordance with the standards and definitions of S-K 1300. The classification parameters are defined relative to the distance between sample data and are intended to encompass zones of reasonably continuous mineralization that exhibit the desired degree of confidence in the estimate.

 

Classification parameters are generally linked to the scale of a deposit: a relatively narrow, high-grade deposit would likely be mined using selective mining methods, at a much lower daily rate than a large, low-grade, bulk mineable deposit. The scale and selectivity of these two examples differs significantly and is reflected in the drill-hole spacing required to achieve the desired level of confidence to define a volume of material that represents, for example, a year of production. Based on engineering studies completed to date, the Arctic deposit is amenable to open pit extraction methods at a production rate of approximately 10,000 t/d. A drill hole spacing study, which tests the reliability of estimates for a given volume of material at varying drill hole spacing, suggests that drilling on a nominal 100 m grid pattern would provide annual estimates of sufficient confidence to classify them in the Indicated category. These results were combined with grade and indicator variograms and other visual observations of the nature of the deposit in defining the criteria for mineral resource classification as described below. At this stage of the Project, there is insufficient density of drilling information to support the definition of Mineral Resources in the Measured category. Manual “smoothing” of the Resource Classification was not performed.

 

The Wood QP expects the majority of Inferred Mineral could be upgraded to Indicated Mineral Resources with additional exploration.

 

Table 11-23 shows the Mineral Resource classification criteria used in the resource model. Figure 11-19 and Figure 11-20 show plan view and cross-section map of the Mineral Resource Classification model.

 

Table 11-23:Mineral Resource Classification and Criteria

 

Resource Classification Criteria
Measured Not used
Indicated Mineralized zones parent block centroid estimated with composites within 100 m of three drill holes.
Inferred Mineralized zones parent block centroid estimated with composites within 150 m of one drill holes.

  
Arctic ProjectPage 208
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Figure 11-19:Oblique View of Mineral Resource Classification Model

 

(GRAPHIC) 

 

Source: Ambler Metals, 2022.

 

Figure 11-20:Cross-Section of Mineral Resource Classification Model, Looking North

 

 Source: Ambler, 2022.

  
Arctic ProjectPage 209
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

11.5.3Uncertainties Affecting Mineral Resource Confidence Classification

 

Factors that may affect the mineral resource estimate are listed below:

 

·Uncertainties in sampling and drilling methods, data processing and handling

 

·Metal price assumptions.

 

·Uncertainties in the assumptions used to generate the cut-off grade.

 

·Uncertainties in the geological and mineralization shapes, and geological and grade continuity assumptions.

 

·Uncertainties in the historically predicted (estimated) SG values determined by Random Forest Regressor.

 

·Uncertainties in the geotechnical, mining, and metallurgical recovery assumptions.

 

·Uncertainties represented by historical assay values for payable metals.

 

·Uncertainties in the resource estimation process including parameters such as capping values, search ellipsoids, variogram models, number of composites.

 

·Uncertainties to the input and design parameter assumptions that pertain to the conceptual pit constraining the estimates.

 

·Uncertainties in the assumptions made to the concentrate marketability, payability and penalty terms.

 

·Uncertainties in the assumptions regarding the continued ability to access the site, retain mineral and obtain surface rights titles, obtain environment and other regulatory permits, and maintain the social license to operate.

 

The above uncertainties were considered in Mineral Resource classification criteria and in the opinion of the QP all issues relating to all relevant technical and economic factors likely to influence the prospect of economic extraction can be resolved with further work.

 

11.5.4Reasonable Prospects for Economic Extraction

 

The Arctic deposit comprises several zones of relatively continuous moderate to high-grade polymetallic mineralization that extends from surface to depths of over 250 m below surface. The deposit is potentially amenable to open pit extraction methods. The “reasonable prospects for economic extraction” was tested using a floating cone pit shell derived based on a series of technical and economic assumptions considered appropriate for a deposit of this type, scale, and location. These parameters are summarized in Table 11-24.

 

Using these parameters, copper equivalent grades that incorporate contributions of the five different metals present in the deposit were calculated using the following equation:

 

CuEq%= (Cu% x 0.92) +(Zn% x 0.290) + (Pb% x 0.231) + (Au g/t x 0.398) + (Ag g/t x 0.005)

 

Using these parameters and the copper equivalent formula, an open pit marginal cut-off grade of 0.5% CuEq was determined.

 

Table 11-24:Parameters Used to Generate a Resource Constraining Pit Shell

 

Optimization Parameters          
Item   Unit   Value  
Open Pit Mining Cost   $/t   3  
Process Cost + G&A   $/t   35  
Pit Slope   degree   43  
Copper Price   $/lb   3.00  
Lead Price   $/lb   0.90  
Zinc Price   $/lb   1.00  
Gold Price   $/oz   1,300  
Silver Price   $/oz   18  
Metallurgical Recovery:  Copper   %   92  
Lead   %   77  
Zinc   %   88  
Gold   %   63  
Silver   %   56  

 

11.5.4.1                   Basis of Commodity Prices and Cost Assumptions

 

Copper, lead, zinc, gold and silver are exchange-traded contracts on all of the world’s major commodity exchanges.

 

The input costs, recoveries and metal prices used to determine the metal cut-off for the Mineral Resources are based on the Arctic 2020 pre-feasibility study and are within the range of the long-term metal price forecast by mining analysts and investment banks at that time. These metal prices and cost inputs presented in Table 11-24 were fixed over the LOM of 13 years.

 

  
Arctic ProjectPage 210
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

11.5.5Mineral Resource Statement

 

The Mineral Resource estimate inclusive of Mineral Reserves is stated in Table 11-25. The Mineral Resource estimate exclusive of Mineral Reserves is stated in Table 11-26. All Indicated Mineral Resources have been converted to Mineral Reserves. Mineral Resources are reported in place (point of reference) and on a 100% basis; however, Trilogy’s attributable interest is 50% of the tonnes and metal content.

 

Figure 11-21 shows the isometric view of the Arctic resource model.

 

Table 11-25:Mineral Resource Summary Table, Inclusive of Mineral Reserves

 

        Average Grade   Contained Metal Content  
Confidence   Tonnage    Cu   Pb   Zn   Au   Ag   Cu   Pb   Zn   Au   Ag  
Category   (Mt)   (%)   (%)   (%)   (g/t)   (g/t)   (Mlb)   (Mlb)   (Mlb)   (koz)   (Moz)  
Indicated   35.7   2.98   0.79   4.09   0.59   45.2   2,347   621   3,216   675   52  
Inferred   4.5   1.92   0.70   2.93   0.43   35.6   189   69   288   62   5  

Notes:

 

1.Mineral Resources are current as of November 30, 2022 and were verified by a Wood QP.

2.Mineral Resources were prepared in accordance with the standards and definitions of S-K 1300.

3.Mineral Resources stated are contained within a conceptual pit shell developed using metal prices of $3.00/lb Cu, $0.90/lb Pb, $1.00/lb Zn, $1300/oz Au and $18/oz Ag and metallurgical recoveries of 92% Cu, 77% Pb, 88% Zn, 63% Au and 56% Ag and operating costs of $3/t mining and $35/t process and G&A. The assumed average pit slope angle is 43°.

4.The cut-off grade is 0.5% copper equivalent. CuEq = (Cu%x0.92) + (Zn%x0.290) + (Pb%x0.231) + (Au g/tx0.398) + (Ag g/tx0.005).

5.As a result of flattening the north end of the reserve pit to stabilize the pit wall due to the presence of talc, a portion of the reserve pit extended beyond the resource constraining pit shell. Approximately 568kt of 1.72% Cu, 0.77% Pb, 0.23 g/t Au and 21.3 g/t Ag in the Indicated category, and approximately 319 kt of 2.01% Cu, 0.87% Pb, 2.53% Zn, 0.50 g/t Au and 37.5 g/t Ag in the Inferred category were added to the Mineral Resource tabulation.

6.The Mineral Resource estimate is reported inclusive of those Mineral Resource that were converted to Mineral Reserves.

7.Trilogy’s attributable interest is 50% of the tonnage and contained metal stated in the table.

8.Figures may not sum due to rounding.

 

Table 11-26:Mineral Resource Summary Table, Exclusive of Mineral Reserves

 

        Average Grade   Contained Metal Content  
Confidence   Tonnage   Cu   Pb   Zn   Au   Ag   Cu   Pb   Zn   Au   Ag  
Category   (Mt)   (%)   (%)   (%)   (g/t)   (g/t)   (Mlb)   (Mlb)   (Mlb)   (koz)   (Moz)  
Inferred   4.5   1.92   0.70   2.93   0.43   35.6   189   69   288   62   5  

 

Notes:

 

1.Mineral Resources are current as of November 30, 2022 and were verified by a Wood QP.

2.Mineral Resources were prepared in accordance with the standards and definitions of S-K 1300.

3.Mineral Resources stated are contained within a conceptual pit shell developed using metal prices of $3.00/lb Cu, $0.90/lb Pb, $1.00/lb Zn, $1,300/oz Au and $18/oz Ag and metallurgical recoveries of 92% Cu, 77% Pb, 88% Zn, 63% Au and 56% Ag and operating costs of $3/t mining and $35/t process and G&A. The assumed average pit slope angle is 43°.

  
Arctic ProjectPage 211
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

4.As a result of flattening the north end of the reserve pit to stabilize the pit wall due to the presence of talc, a portion of the reserve pit extended beyond the resource constraining pit shell and approximately 319 kt of 2.01% Cu, 0.87% Pb, 2.53% Zn, 0.50 g/t Au and 37.5 g/t Ag in the Inferred category were added to the Mineral Resource tabulation.

5.The cut-off grade is 0.5% copper equivalent. CuEq = (Cu%x0.92) + (Zn%x0.290) + (Pb%x0.231) + (Au g/tx0.398) + (Ag g/tx0.005).

6.The Mineral Resource estimate is reported exclusive of those Mineral Resources that were converted to Mineral Reserves.

7.Trilogy’s attributable interest is 50% of the tonnage and contained metal stated in the table.

8.Figures may not sum due to rounding.

 

Figure 11-21:Isometric View of Arctic Mineral Resource

 

(GRAPHIC) 

 

Source: Ambler Metals, 2022.

  
Arctic ProjectPage 212
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

12MINERAL RESERVE ESTIMATES

 

12.1Introduction

 

Mineral Reserves is classified in accordance with standards and definitions of S-K 1300. Modifying factors were applied to the Indicated Mineral Resources to convert them to Probable Mineral Reserves. Mineral Reserves for the Arctic deposit incorporate appropriate mining dilution and mining recovery estimations for the open pit mining method.

 

The Mineral Reserve estimate for the Arctic deposit is based on the resource block model provided by Ambler Metals, as well as other information provided by Ambler Metals, and information generated by Wood based on the preceding 2020 Feasibility Study.

 

The following sections outlines the procedures used to estimate the Mineral Reserves. The mine plan is based on the detailed mine design derived from the optimal pit shell produced by applying the Pseudoflow algorithm.

 

12.2Basis of Commodity Prices and Cost Assumptions Used in Pit Optimization and Cut-Off Determination

 

To establish the long-term metal price forecast the Wood QP used a combination of information derived from 22 financial institutions, from pricing used in technical reports filed with Canadian regulatory authorities over the previous 12-month period, from pricing reported by major mining companies in public filings such as annual reports in the previous 12-month period, spot pricing, and three-year trailing average pricing. From this assessment the Wood QP considers industry consensus on a long-term price forecast on Mineral Reserves as stated in Table 12-1.

 

The costs stated in Table 12-1 are based on the 2020 Feasibility study and are fixed over the 13-year LOM production.

 

12.3Pit Optimization

 

The pit shell that defines the ultimate pit limit, was derived in Whittle using the Pseudoflow pit optimization algorithm. The optimization procedure uses the block value and pit slopes to determine a group of blocks representing pits of valid slopes that yield the maximum profit. The block value is calculated using information stored in the geological block model, commodity prices, mining and processing costs, process recovery, and the sales cost for the metals produced. The pit slopes are used as constraints for removal precedence of the blocks (Xiaoyu Bai, et al., 2017). Table 12-1 provides a summary of the primary optimization inputs.

 

Table 12-1:Optimization Inputs

 

Parameter   Unit   Value   Cu Conc.   Pb Conc.   Zn Conc.  
                       
Metal Prices  
Copper   $/lb   3.46   -   -   -  
Lead   $/lb   0.91   -   -   -  

  
Arctic ProjectPage 213
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Parameter   Unit   Value   Cu Conc.   Pb Conc.   Zn Conc.  
Zinc   $/lb   1.12   -   -   -  
Gold   $/oz   1,615   -   -   -  
Silver   $/oz   21.17   -   -   -  
Discount Rate   %   8   -   -   -  
Dilution and Mine Losses   %   Estimated in a block-by-block basis, adding up 30% to 40%.  
Mining Cost  
Reference Bench Elevation   m   790   -   -   -  
Base Cost   $/t   2.52   -   -   -  
Incremental Mining Cost           -   -   -  
Uphill (below 790m)   $/t/5m   0.02   -   -   -  
Downhill (above 790m)   $/t/5m   0.012   -   -   -  
Process Costs  
Operating Cost   $/t milled   18.31   -   -   -  
G&A   $/t milled   5.83   -   -   -  
Sustaining Capital   $/t milled   2.37   -   -   -  
Road Toll Cost   $/t milled   8.04   -   -   -  
Closure   $/t milled   4.27   -   -   -  
Processing Rate   kt/d   10   -   -   -  
Process Recovery   
Copper   %   -   89.9   2.4   2.7  
Lead   %   -   8.1   79   2.2  
Zinc   %   -   3.4   0.4   90.6  
Gold   %   -   10.9   62.1   5.4  
Silver   %   -   26.4   63.1   3.4  
Payable – Main Element   %   -   96.5   95   85  
Treatment Cost   $/dmt   -   80   160   215  
Refining Cost  
Copper   $/lb   -   0.08   -   -  
Gold   $/oz   -   5   10   -  
Silver   $/oz   -   0.5   1.25   -  

  
Arctic ProjectPage 214
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Parameter   Unit   Value   Cu Conc.   Pb Conc.   Zn Conc.  
Transport Cost   $/dmt   271   -   -   -  
Concentrate Losses   % weight   0.42   -   -   -  
Insurance Cost   %   0.15   -   -   -  
Representation/Marketing   $/wmt   2.5   -   -   -  
Slope Angles  
Geotechnical Sector 1 (2L-E)   degrees   Variable based on slope dip direction. IRA ranging from 26 to 56.  
Geotechnical Sector 2 (2L-W)   degrees   Variable based on slope dip direction IRA ranging from 38 to 56.  
Geotechnical Sector 3 (2U)   degrees   Variable based on slope dip direction IRA ranging from 29 to 56.  
Geotechnical Sector 4 (3)   degrees   Variable based on slope dip direction IRA ranging from 30 to 56.  
Geotechnical Sector 5 (4L)   degrees   Variable based on slope dip direction IRA ranging from 34 to 56.  
Geotechnical Sector 6 (4U)   degrees   Variable based on slope dip direction IRA ranging from 37 to 56.  
Royalties  
NANA Surface Use   %NSR   1   -   -   -  

 

Wood converted the resource model provided by Ambler Metals from a sub-blocked to a regularized percentage model. The model was imported into the optimization software containing grades, block percentages, material density, slope sectors, rock types, and net smelter return. The optimization run was carried out only using Indicated Mineral Resources to define the optimal mining limits.

 

The optimization run included 46 pit shells defined according to different revenue factors, ranging from a revenue factor of 0.3 to 1.2, where a revenue factor of 1 is the base case. To select the optimal pit shell that defines the ultimate pit limit, Wood conducted a pit-by-pit analysis to evaluate the contribution of each incremental shell to the discounted cash flow (DCF), assuming a processing plant capacity of 10 kt/d and a yearly discount rate of 8% (Figure 12-1). Following this analysis, pit shell 17 (revenue factor of 0.62) was selected. Although the DCF for the Selected pit shell is slightly lower in comparison to the Base Case pit shell, the selected pit shell eliminates mining 39.3 Mt of waste while only losing 1.9 Mt of ore. The DCF does not account for initial capital expenditures.

 

  
Arctic ProjectPage 215
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Figure 12-1:Pit-by-Pit Analysis

 

(GRAPHIC) 

 

Source: Wood, 2022.

 

Following the pit-by-pit analysis, a secondary exercise was performed on the selected pit shell to incorporate a higher level of detail to the slope definition and to force the northeast wall to fully mine areas in the pit where talc zones are problematic for slope stability. As a result of this exercise, material contained within the selected pit shell increases by 13 Mt of waste and 0.8 Mt of ore. The final pit shell to be used as the basis for the ultimate pit and mine planning for the Arctic Project is shown in Figure 12-2.

  
Arctic ProjectPage 216
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Figure 12-2:Selected Pit Shell

 

(GRAPHIC) 

 

Source: Wood, 2022.

 

12.4Dilution and Ore Losses

 

The Mineral Resources for the Arctic Project were reported undiluted. In order to determine Mineral Reserves, dilution was applied to the resource model in two steps: internal dilution and contact dilution.

 

Internal dilution accounts for the waste material entrenched within the deposit at the scale of the selective mining unit (SMU) block size. Contact dilution accounts for the dilution and ore losses caused by a block mixing with its surroundings during the mining process and includes ore losses.

 

For transition points between ore and waste, ore loss and dilution will take place as shown in Figure 12 3. Blocks with diluted grades that fell below the cut-off grade were treated as waste and removed from the Mineral Reserve as ore losses.

 

  
Arctic ProjectPage 217
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Figure 12-3:Contact Dilution Concept

 

(GRAPHIC) 

 

Source: Wood, 2022.

 

Internal dilution was estimated as follows:

 

•The resource model was regularized to 5x5x5 m to better approximate mining selectivity. The regularized block model contained the volume percentage within the mineralized zone, and grades and densities for the mineralized zone and host rock.

 

•The grades were diluted per each block using the formula:

 

(GRAPHIC) 

 

Contact dilution was estimated as follows:

 

•To simulate the concept shown in Figure 12-3, the grade of a given block was diluted by blending it with 20% of the tonnage from each of its four lateral blocks . The tonnage of the diluted block remains unchanged in the block model.

 

•For lateral blocks classified as Inferred Mineral Resource, grade was set to zero for dilution purposes.

 

The procedure is illustrated in Figure 12-4.

  
Arctic ProjectPage 218
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Figure 12-4:Contact Dilution Estimation Procedure

 

(GRAPHIC) 

 

Source: Wood, 2022.

 

12.5Cut-Off Definition

 

The cut-off was based on the NSR value. The NSR has been calculated according to the following formulas:

 

(GRAPHIC) 

 

Cost, metal pricing and sales costs are listed in Table 12-1. Variable process recoveries used in the NSR calculation are listed in Table 12-2.

 

The marginal cut-off pays for all the costs except the mining cost and was estimated to be $38.8/t. The economic cut-off pays for all the costs including the mining cost and varies by depth with incremental mining cost between $41.3/t to $ 42.2/t. Ore above the marginal cut-off was included in the Mineral Reserves.

 

Table 12-2: Variable Process Recoveries Used in the NSR Calculation

 

Parameter  Cu Conc   Pb Conc   Zn Conc 
Copper   92.2    0.8    2.1 
Lead   16.0    62.2    4.5 
Zinc   1.9    1.3    87.6 
Gold   47.2    26.1    3.3 
Silver   32.7    48.7    5.8 

 

  
Arctic ProjectPage 219
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

12.6Mineral Reserves Statement

 

Individual blocks captured within the final pit design were identified as either ore or waste by applying the parameters shown in Figure 12 1 with the exception of the metallurgical recoveries which were applied variably on a block-by-block basis. Using the partial block percentages within the final pit design, the ore tonnage and average grades were calculated. The Mineral Reserves statement is shown in Table 12 2. The point of reference for the Mineral Reserves is defined at the point where the ore is delivered to the processing plant. Trilogy’s attributable interest is 50% of the tonnes of the Mineral Reserves.

 

Table 12-3:Mineral Reserve Statement

 

    Tonnage   Average Grade  
Confidence Category   Mt   Cu (%)   Pb (%)   Zn (%)   Au (g/t)   Ag (g/t)  
Probable Mineral Reserves   46.7   2.11   0.56   2.90   0.42   31.8  

 

Notes:

 

1.Mineral Reserves estimates are current as of November 30, 2022 and were prepared by a Wood QP.

2.Mineral Reserves were estimated assuming open pit mining methods and include a combination of internal and contact dilution. Total dilution is expected to be between 30% and 40%. Pit slopes vary by sector and range from 26° to 56°. A marginal NSR cut-off of $38.8 /t is used.

3.Mineral Reserves are based on prices of $3.46/lb Cu, $0.91/lb Pb, $1.12/lb Zn, $1,615/oz Au, and $21.17/oz Ag.

4.Variable process recoveries averaging 92.2% Cu in Cu concentrate, 62.2% Pb in Pb concentrate, 87.6% Zn in Zn concentrate, 16.0% Pb in Cu concentrate, 1.9% Zn in Cu concentrate, 47.2% Au in Cu concentrate, 32.7% Ag in Cu concentrate, 0.8% Cu in Pb concentrate, 1.3% Zn in Pb concentrate, 26.1% Au in Pb concentrate, 48.7% Ag in Pb concentrate, 2.1% Cu in Zn concentrate, 4.5% Pb in Zn concentrate, 3.3% Au in Zn concentrate, 5.8% Ag in Zn concentrate.

5.Mineral Reserves are based on mining cost of $2.52/t incremented at $0.02/t/5m and $0.012/t/5m below and above 790 m elevation, respectively.

6.Costs applied to processed material following: process operating cost of $18.31/t, G&A of $5.83/t, sustaining capital cost of $2.37/t, closure cost of $4.27/t, road toll cost of $8.04/t.

7.Strip ratio (waste:ore) is 7.3:1.

8.Selling terms following: payables of 96.5% of Cu, 95% of Pb and 85% of Zn, treatment costs of $80/t Cu concentrate, $160/t Pb concentrate and $215/t Zn concentrate; refining costs of $0.08/lb Cu in Cu concentrate, and $10/oz Au, $1.25/oz Ag in Pb concentrate; and transport cost $270.98/t concentrate.

9.Fixed royalty percentage of 1% NSR.

10.Trilogy’s attributable interest is 50% of the tonnage stated in the table.

 

12.7Risk Factors that Could Materially Affect the Mineral Reserve Estimates

 

In the opinion of the QP, the Mineral Reserves are subject to the types of risks common to open pit polymetallic mining operations that exist in Alaska and may be materially affected by the following risk factors:

 

•Changes in metal prices from what was assumed;

 

•Changes to the assumptions used to generate the cut-offs;

 

•Changes in local interpretations of mineralization geometry and continuity of mineralized zones;

 

•Changes to geological and mineralization shapes, and geological and grade continuity assumptions;

 

• Changes to density and domain assignments from what was assumed;

 

•Changes to geotechnical, hydrogeological design assumptions;

 

•Changes to mining and metallurgical recovery assumptions;

 

•Change to the input and design parameter assumptions that pertain to the open pit constraining the estimates;

  
Arctic ProjectPage 220
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

•Assumptions as to concentrate marketability, payability and penalty terms;

 

•Assumptions as to the continued ability to access the site, retain mineral tenure and obtain surface rights titles, obtain environment and other regulatory permits, and maintain the social license to operate.

 

More specifically the presence of certain talc layers in the rock have not been included in the current geological model and could affect the metallurgical recoveries and slope stability. Additionally, there is currently no developed surface access to the Arctic Project area and beyond. Access to the Arctic Project is proposed to be via AAP, a road approximately 340 km (211 miles) long, extending west from the Dalton Highway where it would connect with the proposed Arctic Project area. Construction costs of the road are not yet final. The working assumption is that AIDEA would arrange financing in the form of a public-private partnership to construct and arrange for the construction and maintenance of the access road. AIDEA would charge a toll to multiple mining and industrial users (including the Arctic Project) in order to pay back the costs of financing the AAP. The amount paid in tolls by any user would be affected by the cost of the road, its financing structure, and the number of mines and other users of the road which could also include commercial transportation of materials and consumer items that would use the AAP to ship concentrates to the Port of Anchorage in Alaska and possibly provide goods and commercial materials to villages in the region.

 

The Mineral Reserve estimation assumes toll payments of $5.52/t processed, plus a road maintenance fee of $2.52/t milled processed, resulting in a total road toll and maintenance LOM unit cost of $8.04/t processed. There is a risk that a negotiated road toll agreement may result in higher costs than what has been assumed.

  
Arctic ProjectPage 221
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

13MINING METHODS

 

13.1Overview

 

The following section outlines the parameters and procedures used for the design of the mine as a conventional open pit, estimates of the Mineral Reserves within the open pit mine plan, and establishes a practical mining schedule for this Report. The mine plan is based on the Probable Mineral Reserves presented in Section 12.

 

13.2Mine Design

 

The Arctic Project is designed as a conventional truck-shovel operation with 144 t trucks and 15 m3 shovels. The pit design includes four nested phases to balance stripping requirements while satisfying the concentrator requirements.

 

The design parameters include a ramp width of 30 m, road grades of 10%, bench height of 5 m, targeted mining width between 70 and 100 m, berm interval of 20 m, variable slope angles by sector and a minimum mining width of 30 m.

 

Wood performed a review of the pit geotechnical and hydrogeological assessment performed by SRK. Based on the review of the information provided by SRK, Wood agrees with their conclusions. Figure 13-1 shows the geotechnical slope design domains defined by SRK on the 2020 pit design. Table 13-1 shows a summary of the geotechnical design parameters recommended by SRK.

 

  
Arctic ProjectPage 222
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Figure 13-1:Geotechnical Slope Design Domains

 

(GRAPHIC) 

 

Source: Wood, 2022.

 

Table 13-1:Geotechnical Design Parameters

 

Slope Design Domain   Face Slope Dip Direction (*)   Bench Height (m)   IRA (°)   Design BFA* (°)   Design Bench Width (m)  
2L-E   330 - 020   10   40   65   7.5  
    20     65   14.5  
  020 - 050   20   56   80   10.0  
  050 - 100   20   45   65   10.5  
  100 - 160   20   38   65   16.0  
  160 - 250   60   26   27   8.0  
  250 - 300   20   38   80   22.0  
  300 - 330   10   50   80   7.5  
    20   55   80   10.5  

  
Arctic ProjectPage 223
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Slope Design Domain   Face Slope Dip Direction (*)   Bench Height (m)   IRA (°)   Design BFA* (°)   Design Bench Width (m)  
2L-W   330 - 020   10   40   65   7.5  
    20     65   14.5  
  020 - 140   20   56   80   10.0  
  140 - 170   20   45   65   10.5  
  170 - 250   60   38   41   8.0  
  250 - 300   20   40   65   14.5  
  300 - 330   10   50   80   7.5  
    20   55   80   10.5  
2U   330 - 020   20   45   65   10.5  
  020 - 140   20   56   80   10.0  
  140 - 170   20   45   65   10.5  
  170 - 250   60   29   31   8.0  
  250 - 300   20   40   65   14.5  
  300 - 330   10   55   80   7.5  
    20     80   10.5  
3   310 - 020   10   38   65   8.0  
    20     65   16.0  
  020 - 050   20   56   80   10.0  
  050 - 100   20   45   65   10.5  
  100 - 140   20   56   80   10.0  
  140 - 220   20   38   65   16.0  
  220 - 310   60   30   32   8.0  
4L   330 - 020   10   40   65   7.5  
    20     65   14.5  
  020 - 050   20   56   80   10.0  
  050 - 100   20   45   65   10.5  
  100 - 140   20   56   80   10.0  
  140 - 180   20   38   65   16.0  
  180 - 300   60   34   37   8.0  
  300 - 330   10   38   65   8.0  
    20     65   16.0  
4U   330 - 020   20   45   65   10.5  
  020 - 050   20   56   80   10.0  
  050 - 100   20   45   65   10.5  
  100 - 140   20   56   80   10.0  
  140 - 180   20   45   65   10.5  
  180 - 260   60   37   40   8.0  
  260 - 300   20   40   65   14.5  
  300 - 330   10   50   80   7.5  
    20   55   80   10.5  

 

*BFA: Bench Face Angle

 

As mentioned in Section 13.9.10 according to the SRK’s geotechnical recommendations, a large talc zone located in the northeast pit slope must be completely removed. To achieve this, a pit optimization giving dummy values to the talc zone blocks was performed. This pit optimization was used as the basis for the mine design.

 

The smoothed final pit design contains approximately 46.7 Mt of ore and 340.2 Mt of waste for a resulting stripping ratio of 7.3:1. Within the 46.7 Mt of ore, the average grades are 2.11% Cu, 2.90% Zn, 0.56% Pb, 0.42 g/t Au and 31.8 g/t Ag. Figure 13-2 shows the ultimate pit design. Figure 13-3 and Figure 13-4 show pit sections comparing the mine design to the selected pit shells for each optimization.

 

  
Arctic ProjectPage 224
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Figure 13-2:Ultimate Pit Design

 

(GRAPHIC) 

 

Source: Wood, 2022.

  
Arctic ProjectPage 225
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Figure 13-3:Section 1 Showing Mine Design and Selected Pit Shells (looking NW)

 

(GRAPHIC) 

 

Source: Wood, 2022.

 

Figure 13-4:Section 2 Showing Mine Design and Selected Pit Shells (looking W)

 

(GRAPHIC) 

 

Source: Wood, 2022.

  
Arctic ProjectPage 226
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

13.3Interim Phase Design

 

The deposit is mined in four nested phases, including the ultimate pit limit. During pre-production, the phasing strategy maximizes waste mining while minimizing the ore tonnage. This is primarily due to the lack of space to build ore stockpiles. In addition, the phasing strategy maintains enough exposed ore to guarantee the continuous operation of the process plant during the production. The phase designs are shown in Figure 13-5 to Figure 13-7.

 

Figure 13-5:Phase 1 Design

 

(GRAPHIC) 

 

Source: Wood, 2022.

  
Arctic ProjectPage 227
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Figure 13-6:Phase 2 Design

 

(GRAPHIC) 

 

Source: Wood, 2022.

 

Figure 13-7:Phase 3 Design

 

(GRAPHIC) 

 

Source: Wood, 2022.

  
Arctic ProjectPage 228
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

13.4Waste Rock Facilities and Stockpile Designs

 

The design and construction of the WRF should ensure physical and chemical stability during and after mining activities. To achieve this, the waste areas and stockpiles are designed to account for benching, drainage, geotechnical stability, and concurrent reclamation.

 

The WRF design criteria include 23.5-m wide benches every 20 m in elevation with 2.5H:1V overall slopes, lifts from 5-m to 20-m high, and a 33% swell factor for estimating volumes. The overburden mined represents approximately 6% of the total waste and it is considered to be encapsulated within the waste rock. Figure 13-8 shows the WRF design.

 

Figure 13-8:Waste Rock Facility

 

(GRAPHIC) 

 

Source: Wood, 2022.

 

A stockpile is required to store the ore mined during the pre-production period. Because this stockpile is depleted at the beginning of the operation, it is located within the WRF footprint and has a total storage capacity of 223,000 m3. This volume is enough to satisfy the maximum stockpiling capacity of approximately 776 kt. Figure 13-9 shows the stockpile design with respect to the WRF at the end of the pre-production period.

  
Arctic ProjectPage 229
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Figure 13-9:Ore Stockpile

 

(GRAPHIC) 

 

Source: Wood, 2022.

 

13.5Production Schedule

 

The production schedule includes the processing ramp up. The processing plant ramp-up considers the normal inefficiencies related to the start of operations, and includes the tonnage processed as well as the associated recoveries, which increases the design capacity during the second quarter of operation. The mine requires two years of pre-production before the start of operations in the processing plant.

 

The deposit is mined in four nested phases, including the ultimate pit limit. The schedule was developed in months for the pre-production period and the first two years of production, in quarters from Year 3 to Year 5 of production, and annually thereafter. The scheduling constraints set the maximum mining capacity at 35 Mt per year and the maximum number of benches mined per year at ten in each phase.

 

The production schedule based on the Probable Mineral Reserves shows a LOM of 15 years, including two years of pre-production. The amount of rehandled mill feed is 776 kt, which is the ore mined during the pre-production period. The average grades to the mill over the LOM are 2.11% Cu, 2.90% Zn, 0.56% Pb, 0.42 g/t Au, 31.83 g/t Ag and 2.92% Talc. The annual LOM summary schedule is shown in Table 13-2 and Figure 13-10. Figure 13-11 shows the annual tonnage mined by phase.

 

  
Arctic ProjectPage 230
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Table 13-2: Production Schedule

 

   Tonnage  Average Grade 
   To Mill  Mine to  Total  Cu  Zn  Pb  Au  Ag  Talc 
Period  Direct
(kt)
  Stockpile
(kt)
  Total
(kt)
  Stockpile
(kt)
  Waste
(kt)
  (%)  (%)  (%)  (g/t)  (g/t)  (%) 
Year -2  -  -  -  493  26,907  -  -  -  -  -  - 
Year -1  -  -  -  283  34,761  -  -  -  -  -  - 
Year 1  2,235  776  3,012  -  31,842  2.59  2.87  0.55  0.36  33.07  1.59 
Year 2  3,650  -  3,650  -  30,540  2.06  2.48  0.50  0.38  29.03  3.35 
Year 3  3,650  -  3,650  -  27,365  1.94  2.61  0.56  0.39  28.42  7.46 
Year 4  3,650  -  3,650  -  26,350  1.88  2.82  0.58  0.42  28.03  4.13 
Year 5  3,650  -  3,650  -  25,580  1.87  2.86  0.53  0.33  26.36  32.97 
Year 6  3,650  -  3,650  -  24,913  1.99  2.51  0.49  0.34  28.66  3.31 
Year 7  3,650  -  3,650  -  24,413  2.37  3.11  0.57  0.40  31.75  3.2 
Year 8  3,651  -  3,651  -  19,850  2.00  3.107  0.61  0.44  32.44  1.32 
Year 9  3,650  -  3,650  -  20,350  2.05  2.51  0.39  0.37  28.50  4.56 
Year 10  3,650  -  3,650  -  17,922  2.33  3.09  0.53  0.50  36.80  2.76 
Year 11  3,650  -  3,650  -  15,350  2.41  2.41  0.64  0.56  38.68  21.95 
Year 12  3,650  -  3,650  -  11,629  1.98  3.15  0.66  0.47  34.08  0.59 
Year 13  3,529  -  3,529  -  2,126  2.09  3.20  0.69  0.52  38.39  0.14 
Total  45,915  776  46,691  776  338,726  2.06  2.83  0.55  0.41  31.10  2.89 

  
Arctic ProjectPage 231
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Figure 13-10: Annual Production Schedule

 

 

Source: Wood, 2022

 

Figure 13-11: Total Tonnage Mined, Scheduled by Phase

 

 

Source: Wood, 2022

  
Arctic ProjectPage 232
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

13.6Waste Material Handling

 

Waste is hauled to the WRF using 144 t trucks. The construction sequence starts at the bottom of the dump by dumping the material in 5-m lifts, leaving a 23.5-m bench every four lifts. The resulting overall slope angle of the dump face is 2.5H:1V.

 

13.7Operating Schedule

 

The Arctic mine is scheduled to operate 24 hours a day, seven days a week utilizing three rotating crews working 12-hour shifts. There are two 12-hour shifts scheduled, consisting of a day shift and a night shift. A number of duties only require work during the dayshift hours. For these duties, two crews rotate to provide seven day-a-week day-shift coverage.

 

For the rotating mine operations crews, approximately three hours are lost per day to standby time, inclusive of two hours for breaks, 20 minutes for fuelling 20 minutes for shift change, and 20 minutes for blast delay (Table 13-3).

 

Over a year, approximately 13 days are lost to poor weather conditions, predominantly in the wintertime. It is assumed that the equipment is manned but delayed during these weather events.

 

Table 13-3: Gross Operating Hours per Year

 

Time Definition  Hydraulic Shovel   Front End
Loaders
   Trucks   Drills 
Calendar Time                    
Calendar Days   365    365    365    365 
Shifts per day   2    2    2    2 
Shift length (h)   12    12    12    12 
Calendar Time (h/a)   8,760    8,760    8,760    8,760 
Available Time                    
Availability   85%   85%   85%   85%
Down time (h/a)   1,314    1,314    1,314    1,314 
Available Time (h/a)   7,446    7,446    7,446    7,446 
Gross Operating Time                    
Operating Standby   -    -    -    - 
Lunch & breaks (min/day)   120    120    120    120 
Fueling (min/day)   20    20    20    30 
Shift change (min/day)   20    20    20    20 
Meetings (min/day)   20    20    20    20 
Blasting (min/day)   -    -    -    20 
Weather (d/a)   13    13    13    13 
Operating Standby (h/a)   1,196    1,196    1,196    1,351 
Gross Operating Hours (h/a)   6,250    6,250    6,250    6,095 

 

Accounting for standby time and weather delays, equipment accumulates on average 6,250 gross operating hours (GOH) per year in the example above. For productivity calculations, it is assumed that following preproduction, the trucks and shovels are in a productive cycle of approximately 50 minutes each hour, or 83% of the time. For drills, the productive utilization is lower and in the range of 65% based on benchmarking with similar mines.

  
Arctic ProjectPage 233
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

As with mine operations, mine maintenance is scheduled to work a 24/7 schedule to allow for continuous maintenance coverage. However, the majority of planned maintenance work is done during the day shift with a skeleton crew scheduled for the night shift.

 

Blasting is only scheduled during the day shift. Two blasting crews rotate on a 12-hour day shift, for seven day-a-week coverage.

 

13.8Mining Equipment

 

A conventional owner-operated truck fleet utilizing a combination of hydraulic shovels and front-end loaders (FELs) is planned. The truck fleet consists of large trucks for waste stripping and for mining the ore zones. The trucks are diesel powered with a combined capacity to mine a maximum of 40 Mt/a operating on a combination of 5 m and 10 m benches. The loading fleet is also diesel powered. Blasting is contract performed with explosives manufactured off-site and delivery to site by trucks.

 

Equipment requirements are estimated annually over the life of the mine. Equipment sizing and numbers are based on the mine plan, the operational factors shown in Table 13-4, and a twenty-four hour per day, seven day a week work schedule.

 

Table 13-4: Equipment Utilization and Efficiency

 

Description  Average Mechanical Availability (%)   Efficiency
(%)
 
171 mm Production Drill   83%   65%
265 t/15 m3 Hydraulic Face Shovel   85%   83%
124 t/12 m3 Front End Loader   85%   83%
144 t Haul Truck   85%   83%
41t Articulated Truck   86%   83%
26 t/5 m3 Front End Loader   86%   83%
68 t/4 m3 Hydraulic Excavator   86%   83%
35 t/1.4 m3 Hydraulic Excavator   85%   83%
74 t/455 kW Track Dozer   85%   83%
50 t/419 kW Rubber Tired Dozer   85%   83%
40 t Articulated Sand Truck   85%   83%
33 t/217 kW Motor Grader   85%   83%
35,000-litre water truck   85%   83%
41t Articulated Fuel/Lube Truck   85%   83%

 

13.8.1Blasting

 

Blasting operations are contracted to a blasting explosives provider who is responsible for the blast design, loading, stemming, and initiation. Bulk emulsion is manufactured off-site. The explosive provider transports explosive material from Fairbanks, Alaska. The explosive is stored in four explosive silos with 80-ton capacity each: two silos for storing Ammonium Nitrate and the other two for storing emulsion produced on site.

  
Arctic ProjectPage 234
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

In performing the explosive services, the blasting contractor is proposing to provide:

 

•Two five person blasting crews providing seven day a week coverage

 

•Transportation of the explosive from Fairbanks to site

 

Additionally, two (2) Mobile Manufacturing Unit (MMU) trucks and one stemming truck are provided by the mine. The MMU explosive trucks delivers a bulk emulsion product when required.

 

Two types of Heavy ANFO blend (HA) are used: 70% emulsion/30% Ammonium Nitrate Fuel Oil (ANFO) for wet material, and 30% emulsion/70% ANFO for dry material, with specific gravity of 1.25 g/cm3 and 1.23 g/cm3, respectively.

 

The wall control design patters are based on the 2022 Arctic Drill and Blast Study recommendations There are three main types of geotechnical zones within the pit: one group in the North and East walls, where the slope design is governed by the shallower foliation, with IRA lower than 38° and with geotechnical berms every 60 m, other group with IRA of between 38° and 47°, and other group with IRA greater than 47°. Pre-split blasting only used for the third group with IRA greater than 47°. For other zones, multiple stab trim holes are used for face outlining.

 

Table 13-5 shows the design parameters for production and wall control blasting.

 

Table 13-5: Blasting Design Input

 

Description  Units  Waste  Ore Dry  Waste
Wet
  Ore Wet  Trim 1
(1)
  Trim 2
(2)
  Trim 3
(3)
  Pre-split
(3)
 
Rock Density  t/m3  2.76  3.22  2.76  3.22  2.76  2.76  2.76  2.76 
Explosive     HA37   HA37   HA73   HA73   HA37   HA37   HA37   HA37 
Explosive Density  kg/m3  1,230  1,230  1,250  1,250  1,230  1,230  1,230  1,230 
Bench Height  m  10  10  10  10  8.3  10  10  10 
Hole Diameter  m  0.171  0.171  0.171  0.171  0.171  0.171  0.171  0.171 
Burden  m  5.1  4.2  5.1  4.2  6.0  5.3  3.7  1.5 
Spacing  m  5.9  4.8  5.9  4.8  5.5  4.8  3.9  2.5 
Sub drill  m  1.0  1.0  1.0  1.0  0.0  0.1  0.0  0.0 
Stemming  m  3.5  4.0  3.5  4.0  3.8  5.4  5.9  9.6 
Drill length per hole  m  11  11  11  11  8.3  10  10  10 
Rock Volume per hole  m3  301  202  301  202  273  258  143  38 
Rock Tonnage per hole  t  830  649  830  649  755  712  394  104 
Rock Tonnage  t/m  75  59  75  59  91  70  39  10 
Explosive Column  m  7.5  7.0  7.5  7.0  4.5  4.7  4.1  0.4 
Weight of explosive  kg  212  198  215  201  128  133  116  13 
Powder Factor (by rock volume)  kg/m3  0.70  0.98  0.72  1.00  0.47  0.52  0.81  0.33 
Powder Factor  kg/t  0.26  0.30  0.26  0.31  0.17  0.19  0.29  0.12 

  
Arctic ProjectPage 235
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

1.Geotechnical zones with IRA below 38 degrees and 60 m bench height. Domains 2L-E, 2L-W and 4L.
2.Geotechnical zones with IRA between 38 and 40 degrees and bench height shorter than 20 m. Domain 3 and 4L.
3.Geotechnical zones with IRA greater than 47 degrees and bench height shorter than 20 m. Domain 2U and 4U.

 

Although material is mined on a combination of 5 and 10 m benches, all material is drilled and blasted on 10 m benches.

 

The powder factor for ore is 0.3 kg/t and 0.26 kg/t for waste. For trim, variable powder factors were used depending on the characteristics of the geotechnical zone. Table 13-6 provides a summary of the material blasted on an annual basis.

 

Table 13-6: Material Blasted Quantities

 

Period  Powder Factor (kg/t)  Waste Blasted (kt)  Ore Blasted (kt)  Trim Blasted(1) (kt)  Total Blasted (kt) 
Year -2  0.26  26,157  493  750  27,400 
Year -1  0.25  30,262  283  4,499  35,044 
Year 1  0.25  29,404  2,235  2,438  34,077 
Year 2  0.25  25,754  3,650  4,786  34,190 
Year 3  0.25  21,939  3,650  5,426  31,015 
Year 4  0.25  22,156  3,650  4,194  30,000 
Year 5  0.25  21,181  3,650  4,669  29,500 
Year 6  0.25  19,687  3,650  5,226  28,563 
Year 7  0.25  20,176  3,650  4,237  28,063 
Year 8  0.25  15,976  3,651  3,873  23,500 
Year 9  0.26  16,856  3,650  3,494  24,000 
Year 10  0.26  15,809  3,650  2,113  21,572 
Year 11  0.26  12,217  3,650  3,133  19,000 
Year 12  0.25  7,949  3,650  3,680  15,280 
Year 13  0.27  -  3,529  2,126  5,655 
Total  0.25  285,524  46,691  54,643  386,859 

 

1.Includes Pre-split.

 

Blasting products consumed on an annual basis are shown in Table 13-7.

 

Table 13-7: Explosives Quantities

 

Period  ANFO (t)  Emulsion Bulk (t)  Detonators Pyrotechnic
(Units)
  Boosters 0.45kg (Units) 
Year -2  3,147  3,669  33,301  33,301 
Year -1  3,980  4,416  42,917  42,917 
Year 1  3,932  4,491  42,135  42,135 
Year 2  3,958  4,369  43,090  43,090 
Year 3  3,596  3,895  39,403  39,403 
Year 4  3,493  3,851  38,027  38,027 

  
Arctic ProjectPage 236
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Period  ANFO (t)  Emulsion Bulk (t)  Detonators Pyrotechnic
(Units)
  Boosters 0.45kg (Units)  
Year 5  3,438  3,752  37,537  37,537  
Year 6  3,331  3,587  36,557  36,557  
Year 7  3,285  3,594  35,920  35,920  
Year 8  2,767  3,004  30,543  30,543  
Year 9  2,836  3,105  31,369  31,369  
Year 10  2,568  2,878  28,298  28,298  
Year 11  2,269  2,457  25,538  25,538  
Year 12  1,847  1,917  21,310  21,310  
Year 13  746  722  9,206  9,206  
Total  45,193  49,708  495,151  495,161  

 

13.8.2Drilling

 

Throughout the project life, drilling is required for both ore control and production blasting. Rock fragmentation achieved through blasting is the overriding design criteria for the drill hole pattern design. The blast hole drilling design from Section 13.8.1 with the drill penetration rates described below are used to estimate drilling requirements.

 

Drill penetration is a function of bit size, bit load, drilling method, and rock strength properties. Wood relied on SRK’s 2022 Pre-Feasibility Study Geotechnical and Hydrogeological Assessment report. SRK completed unconfined compressive testing (UCS) and point load testing on Arctic’s primary rock types. The results of the uniaxial compressive tests for the primary ore hosting rocks (lithological units) are shown in Table 13-8. The weighted average UCS value for the ore hosting rocks is 83 MPa and 59 MPa for the waste areas.

  
Arctic ProjectPage 237
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Table 13-8: Rock Type Weight and UCS

 

Lithology  UCS (MPa)  Samples (Units) 
Ore Hosting       
Black to Grey Schist (GS)  97  14 
Massive Sulphide (MS)  56  6 
Semi-massive Sulphide (SMS)  68  3 
Average Ore  83  23 
Waste       
Aphanitic Metarhyolite (AMR)  88  5 
Chlorite Schist (CHS)  20  2 
DIKE  62  2 
Debris Flow (DM)  71  3 
Button Schist (MRP)  73  9 
Quartz-Felspar-Mica Schist (QFMS)  64  5 
Quartz- Mica Schist QMS  50  5 
QMSP  62  2 
Talc Schist (TS)  1  2 
CHTS  3  2 
Average Waste  59  37 

 

Instantaneous penetration rates (IPR) were calculated based on UCS data, rock factor and the Workman Szumanski (1996, 1997) formula. Using the Workman Szumanski (1996, 1997) formula Penetration Rate shown in Equation 13-1, and the inputs in Table 13-9, the instantaneous penetration rate (P) for waste and ore were estimated at 67 m/h and 45 m/h, respectively.

 

Equation 13-1: Workman, Szumanski (1996,1997) Formula

 

 

 

Table 13-9: Workman, Szumanski (1996,1997) Inputs

 

Item  Waste  Ore  
RF - Rock factor  148  120  
Sc – UCS (MPa)  59  83  
P – pulldown (lb)  50,000  50,000  
D - Bit Size (mm)  171  171  
P/D - Pulldown (kg/m)  133,000  133,000  
RPM – Revolutions per minute  90  90  
P - Instantaneous Pen Rate (m/h)  67  45  

  
Arctic ProjectPage 238
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

The total drilling cycle time accounts for drilling time, tramming time between holes, setup time, and bit change time. Because the CAT MD6250main drill equipment can drill to a 13.6 m depth, no time is required for drill steel addition. The average penetration rate shown in Table 13-10 also assumes 65% productive utilization, or 39 minutes out of 60 minutes that the drill is in the drilling cycle.

 

Table 13-10: Drill Penetration Rates

 

Material   IPR  Drill Hole
Length
  Tram
Time
  Setup
Time
  Bit
Change
  Total
Cycle
  NOH Pen
Rate
  GOH Pen
Rate1
 
Type  (m/h)  (m)  (min)  (min)  (min)  (min)  (m/h)  (m/h)  
Waste  67  11  0.55  3.00  0.38  13.81  47.79  31.1  
Ore  45  11  0.55  3.00  0.38  18.61  35.47  23.1  

 

1Assumes 65% efficiency.

 

Table 13-11 shows the drill requirements, the meters drilled, the hours operated, and the average penetration rate by period. During Year -2, two production drills are required. From Year -1 to Year 7, mining requires three production drills. Following Year 7, drill requirements drop to two and after Year 12, drill requirements drop to one along with a drop in of total tonnes mined. Penetration rates average 29.8 m/h over the LOM.

 

Table 13-11: Drill Requirements and Performance

 

Period  Drills Required (Units  Meters Drilled (m)  Gross Operating Hours
(GOH)
  Average Penetration Rate
(m/h)
 
Year -2  2  375,812  12,795  29.4  
Year -1  3  470,586  15,783  29.8  
Year 1  3  469,235  15,811  29.7  
Year 2  3  472,384  16,299  29.0  
Year 3  3  429,789  14,661  29.3  
Year 4  3  418,968  14,089  29.7  
Year 5  3  413,125  13,742  30.1  
Year 6  3  400,873  13,206  30.4  
Year 7  3  396,514  13,008  30.5  
Year 8  2  335,237  11,659  28.8  
Year 9  2  344,926  11,616  29.7  
Year 10  2  313,880  11,616  27.0  
Year 11  2  278,087  9,218  30.2  
Year 12  2  228,627  7,708  29.7  
Year 13  1  97,266  3,007  32.3  
Total     5,445,309  184,219  29.6  

  
Arctic ProjectPage 239
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

The 2022 Arctic Drill and Blast study (Floyd, 2022) recommends 90° presplit for zones with inter-ramp angle greater than 47°, with the same drill hole diameter than the production drill holes. Therefore, only rotary drills are considered at this point. The study also suggests that in case the 90° presplit is not suitable according to field testing, smaller diameters, inclined holes, and a top head hammer (THH) drill with a 121 mm bit will be needed.

 

13.8.3Loading

 

Wood completed an equipment trade-off study based in quantitative and qualitative characteristic of the equipment and vendor’s quotations received. From the trade-off study, the primary loading units selected are two 15 m3 hydraulic shovels. After Year 11 only one hydraulic shovel is required. To assist the hydraulic shovels, two 12 m3 front end loaders (FEL) are scheduled until Year 7 of production, dropping to one until the end of the LOM. The FEL is also used for stockpile rehandling, all of which is scheduled in Year 1. Loading requirements are shown in Table 13-12.

 

Table 13-12: Loading Requirements and Performance

 

   15 m3 shovel  12 m3 FEL  
      Productivity     Productivity  
   Number  (t/GOH)  Number  (t/GOH)  
Year -2   2   1,241   2  829  
Year -1   2   1,698   2  995  
Year 1   2   1,718   2  1,006  
Year 2   2   1,673   2  1,003  
Year 3   2   1,690   2  750  
Year 4   2   1,643   2  738  
Year 5   2   1,630   2  729  
Year 6   2   1,606   2  714  
Year 7   2   1,576   2  698  
Year 8   2   1,501   1  813  
Year 9   2   1,531   1  834  
Year 10   2   1,384   1  734  
Year 11   2   1,224   1  615  
Year 12   1   1,532   1  311  
Year 13   1   675   1  233  
Average     1,488     733  

 

The 15 m3 shovel five-pass loads the 144 t truck in approximately three minutes. The LOM production rate averages 1,488 dry t/GOH, compared to the maximum productivity of 1,923 dry t/GOH shown in Table 13-13. The peak productivity scheduled for the shovel occurs in Years 1, when it is scheduled at 1,718 dry t/GOH.

  
Arctic ProjectPage 240
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Table 13-13: Hydraulic Shovel Productivity

 

Loader     15 m3 Shovel  
Truck  Unit  144 t Truck  
Bucket Capacity  m3  15  
Bucket Capacity  t  30  
Truck Capacity  m3  94  
Truck Capacity  t  144  
Insitu Bulk Density  t/m3  2.8  
Bulk Factor     1.3  
Loose Density  t/m3  2.15  
Moisture  %  3 %
Fill Factor     0.86  
Effective Bucket Capacity  m3  12.97  
Wet/Loose Density  t/m3  2.22  
Tonnes/Pass  t  28.80  
Theoretical Passes (Volume)     7.25  
Theoretical Passes (Weight)     5.00  
Actual Passes     5  
Truck Load  m3  64.85  
Truck Load  t  144.0  
Truck Fill % (Volume)     69 %
Truck Fill % (Weight)     100 %
Loader Cycle Time  seconds  35  
Loader Spot Time  seconds  30  
Load Time per Truck  seconds  170  
Maximum Truck Loads per hour     21.18  
Maximum Productivity  (wet t/adj. NOH)  3,049  
Maximum Productivity  (wet t/NOH)  2,379  
Maximum Productivity  (wet t/GOH)  1,982  
Maximum Productivity  (dry t/GOH)  1,923Sh  
Maximum Productivity  (wet t/d)  34,460  
Maximum Productivity  (dry t/a)  12,200,469  
Maximum Productivity  (dry t/d)  33,426  

 

The FEL seven-pass loads the 144 t truck in approximately three and a half minutes. The LOM production rate averages 797 dry t/GOH, compared to the maximum productivity of 1,139 dry t/GOH shown in Table 13-14. The peak productivity scheduled for the FELs occurs in Year 1, when the FEL is scheduled at 1,008 dry t/GOH.

  
Arctic ProjectPage 241
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Table 13-14: Front End Loader Productivity

 

Loader     12 m3 FEL  
Truck  Unit  144 t Truck  
Bucket Capacity  m3  11.7  
Bucket Capacity  t  21.0  
Truck Capacity  m3  94.0  
Truck Capacity  t  144.0  
Insitu Bulk Density  t/m3  2.8  
Bulk Factor     1.3  
Loose Density  t/m3  2.15  
Moisture  %  3.0 %
Fill Factor     0.79  
Effective Bucket Capacity  m3  9.26  
Wet/Loose Density  t/m3  2.22  
Tonnes/Pass  t  20.57  
Theoretical Passes (Volume)     10.15  
Theoretical Passes (Weight)     7.00  
Actual Passes     7.00  
Truck Load  m3  64.85  
Truck Load  t  144.0  
Truck Fill % (Volume)     69 %
Truck Fill % (Weight)     100 %
Loader Cycle Time  seconds  42  
Loader Spot Time  seconds  35  
Load Time per Truck  seconds  287  
Maximum Truck Loads per hour     12.54  
Maximum Productivity  (wet t/adj. NOH)  1,806  
Maximum Productivity  (wet t/NOH)  1,409  
Maximum Productivity  (wet t/GOH)  1,174  
Maximum Productivity  (dry t/GOH)  1,139  
Maximum Productivity  (wet t/d)  20,246  
Maximum Productivity  (dry t/a)  7,168,141  
Maximum Productivity  (dry t/d)  19,639  

 

In addition to the primary loading units, a 5 m3 FEL is paired with two 41 t articulated trucks throughout the mine life for bench development/pioneering work and winter snow removal. A 3.8 m3 excavator is also used to maintain haul roads and scale the pit walls as needed.

  
Arctic ProjectPage 242
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

13.8.4Hauling

 

From the TCO analysis, the primary hauling unit selected for ore and waste mining is a mechanical drive truck with a payload capacity of 144 t wet, assuming a standard body with a full set of liners. The dry capacity is estimated at 140 t, assuming 3% moisture and carry back.

 

Wood estimated truck requirements on a period-by-period basis using travel distances from a road network developed within Minesight®. Haul segment distances were reported for each material type from their location on a mining bench to their final destination. Assuming 2% rolling resistance for haul roads, travel speeds were estimated from the manufacture’s performance curves, and applied to each haul segment to estimate travel time. To better reflect actual speeds in an operating environment, the truck speeds were speed-limited according to Table 13-15.

 

Table 13-15: Truck Speed Limits

 

Segment  Loaded
(kph)
  Empty
(kph)
 
Maximum Overall Speed  45  45  
Maximum Speed within 100 m of dump face and shovel  25  25  
Maximum Speed on a 10% downhill grade  30  30  

 

Table 13-16 provides the adjusted speeds and fuel burns by haul grade used to estimate truck requirements and diesel fuel usage for the 144 t trucks.

 

Table 13-16: Truck Speed Limits

 

Actual
Grade
(%)
  Haul
Loaded
(kph)
  Return
Empty
(kph)
  Fuel
Loaded
(l/h)
  Return
Empty
(l/h)
 
-10%  30  30.0  19.1  19.1  
10%  11.5  27  190.8  190.8  
Flat Ex-pit  45  45  124.9  72.8  
Flat In-pit  25  25  162.0  72.7  
Idle  -  -  19.1  

 

Truck requirements by period are shown in Table 13-17 for 144 t trucks, together with the average one-way haul distance, average fuel consumption, and average truck productivity. Fourteen trucks are commissioned during pre-production. During Year 1 the fleet is ramped up to 15, reaching its peak. After Year 9, truck requirements drop to 14. Following Year 10, the 144 t truck requirements decline with declining mining rates.

  
Arctic ProjectPage 243
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Table 13-17: Truck Requirements and Performance

 

   Trucks Required  Average one-way Haul
Distance
  Average Fuel Burn  Average Truck
Production
 
   #  (m)  l/GOH  t/GOH  
Year -2  11  2,693  62  384  
Year -1  14  2,558  63  387  
Year 1  15  3,127  64  362  
Year 2  15  2,953  68  356  
Year 3  15  2,874  69  346  
Year 4  15  3,034  73  318  
Year 5  15  3,117  76  316  
Year 6  15  2,962  77  310  
Year 7  15  3,131  80  305  
Year 8  15  3,353  82  275  
Year 9  15  3,734  85  262  
Year 10  14  3,847  88  252  
Year 11  14  4,039  91  222  
Year 12  12  4,206  92  209  
Year 13  4  3,449  87  232  
Average  -  3,173  75  317  

 

13.8.5Support

 

Support equipment includes excavators, track dozers, rubber-tired dozers (RTDs), sand trucks, graders, water trucks, fuel/lube trucks, and water trucks. The major tasks for the support equipment include:

 

•Bench and road maintenance

 

•Shovel support/clean-up

 

•Blasting support/clean-up

 

•WRF maintenance

 

•Stockpile construction/maintenance

 

•Road building/maintenance

 

•Pioneering and clearing work

 

•Field equipment servicing

 

A description of each support equipment fleet follows:

 

•35 t Excavator – One excavator scheduled throughout the mine life. Its primary functions are to support dewatering, maintain pit drainage, break rocks utilizing the rock breaker attachment, and backup the 5 m3 FEL.

  
Arctic ProjectPage 244
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

•72t/455 kW track dozers are estimated at 0.5 dozers per production blast hole drill and production loading unit. The dozer fleet peaks at 4 machines in pre-production. Their primary functions are to maintain pit floors, maintain dumps and stockpiles, build pit roads, and clean final pit walls. Due to limited mobility, the 72 t dozers are transported between working areas using a 90 t capacity transport trailer. The transport is also used to transport the 65 t drills and the 35 t excavator.

 

•47t/419 kW rubber-tired dozer requirements are estimated at approximately one RTD per hydraulic shovel. Their primary function is to maintain shovel floors, provide drill pattern clean-up, clear rock spillage, and provide backup dump and stockpile maintenance. At peak, two-wheel dozers support two 15 m3 shovels and associated mining areas.

 

•41t Articulated Sand Truck – One articulated truck is fitted with a sander and used to support winter operations throughout the LOM.

 

•227 kW motor graders are estimated at approximately one grader per 8 trucks. Their primary function is to maintain roads, dump areas, and pit areas. Two graders are scheduled along the life of the mine, dropping to 1 the last year, Y12.

 

•Two 35,000 litre water trucks are estimated to support the mine operation. During the winter season, from October to April, water trucks are lightly scheduled. They are primarily used for watering the drills and for fire patrol; nonetheless, even during the winter season roads become dusty. During May to September, when dust suppression requirements are at their highest, the water trucks are fully scheduled.

 

•Fuel/lube truck requirements are estimated at a ratio of one lube truck per 10 pieces of tracked field equipment. They are used to fuel and service shovels and other tracked field equipment. At peak, the mine operates one fuel/lube truck.

 

•One 1.4 m3 backhoe is scheduled throughout the mine life. Its primary functions are to support dewatering, maintain pit drainage, and break rocks utilizing the rock breaker attachment.

 

Support equipment requirements are shown in Table 13-18.

 

Table 13-18: Support Equipment

 

Period  35 t
Excavator
  Bulldozer -
455 kW
  Wheel dozer -
419 kW
  Motor grader –
217 kW
  Sand Truck -
41 t
  Water Truck -
35000 l
  Fuel / Lube
Truck
  Backhoe -
1.4 m3
 
Year -2  1  4  2  2  1  2  1  1  
Year -1  1  4  2  2  1  2  1  1  
Year 1  1  4  2  2  1  2  1  1  
Year 2  1  4  2  2  1  2  1  1  
Year 3  1  4  2  2  1  2  1  1  
Year 4  1  4  2  2  1  2  1  1  
Year 5  1  4  2  2  1  2  1  1  
Year 6  1  4  2  2  1  2  1  1  
Year 7  1  3  2  2  1  2  1  1  
Year 8  1  3  2  2  1  2  1  1  
Year 9  1  3  2  2  1  2  1  1  
Year 10  1  3  2  2  1  2  1  1  

  
Arctic ProjectPage 245
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Period  35 t
Excavator
  Bulldozer -
455 kW
  Wheel dozer -
419 kW
  Motor grader –
217 kW
  Sand Truck -
41 t
  Water Truck -
35000 l
  Fuel / Lube
Truck
  Backhoe -
1.4 m3
 
Year 11  1  2  1  2  1  2  1  1  
Year 12  1  2  1  2  1  2  1  1  
Year 13  1  2  1  2  1  2  1  1  

 

13.8.6Auxiliary

 

To support mine maintenance and mine operation activities, a fleet of auxiliary equipment is required. The types and numbers of auxiliary equipment are listed in Table 13-19in five-year increments.

 

Table 13-19: Auxiliary Equipment

 

Equipment  Year 1  Year 5  Year 13  
Mine Maintenance           
Truck Mounted 40 t Crane  1  1  1  
100 t Rough Terrain  1  1  1  
5t Rough Terrain Forklift  2  2  2  
10t Forklift  2  2  2  
Mechanic Service Truck  3  3  3  
Small Fuel/Lube truck  1  1  1  
55 kW Skid Steer  1  1  1  
Flatbed Truck  2  2  2  
45t Telehandler  1  1  1  
Mine Operations           
Small backhoe/loader  1  1  1  
Hydraulic hammer/impactor  1  1  1  
90 t Lowboy  1  1  1  
Compactor  1  1  1  
Light Plant  11  8  5  
Transport Tractor  1  1  1  
Tire Handler Truck  1  1  1  
3/4 ton Pickup  4  4  4  
1 ton Pickup  5  4  2  
Crew Bus  5  4  2  
Fleet Management System  1  1  1  
Mine & Geology Software  10  10  10  
Heavy ANFO (blend) Truck  2  2  2  
Stemming Truck  1  1  1  
Laser Scan  2  2  2  
Survey Drones  2  2  2  

  
Arctic ProjectPage 246
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Equipment  Year 1  Year 5  Year 13  
Total Station System  1  1  1  

 

13.8.7Labour

 

Wood developed the staffing plan based on the primary assumptions that the owner will perform the equipment maintenance and the blasting operations will be subcontracted.

 

At peak staffing levels in Year 1, the mine department includes 205 employees including 31 salaried and 174 hourly. The blasting contractor estimated that they will have 10 people on site on two crews including one supervisor, two blaster, two MMU operators per crew.

  
Arctic ProjectPage 247
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

The salaried staff is estimated based on level of effort. The hourly staff is estimated on both level of effort and on mobile equipment coverage.

 

Mine maintenance hourly staffing is estimated by multiplying a ratio of mechanic time required by machine-operated hours. Table 13-20 provides a listing of the ratios by machine. Wood used its historical database to estimate ratios for the mine equipment.

 

Table 13-20: Ratio Maintenance Hours to Equipment Operated Hours

 

Equipment  Ratio Maintenance Hours to
Equipment Operated Hours
 
171 mm Production Drill  0.90  
265 t/15 m3 Hydraulic Face Shovel  0.90  
124 t/12 m3 Front End Loader  0.90  
144 t Haul Truck  0.52  
41t Articulated Truck  0.52  
26 t/5 m3 Front End Loader  0.90  
68 t/4 m3 Hydraulic Excavator  0.90  
35 t/1.4 m3 Hydraulic Excavator  0.50  
74 t/455 kW Track Dozer  0.50  
50 t/419 kW Rubber Tired Dozer  0.50  
40 t Articulated Sand Truck  0.50  
33 t/217 kW Motor Grader  0.50  

 

13.9Geotechnical and Hydrogeological Assessments

 

SRK reviewed the previous work and recommendations, identified potential risks and opportunities highlighted in the previous studies and designed the field program and laboratory testing to update the structural, geotechnical and hydrogeological models to support this pre-feasibility study. Detailed slope stability assessments were completed using the previously designed pit shells, dated Nov 2019, and updated slope design recommendations were provided with a focus on the slope stability risk related to potential sliding failure along talc zones in the northeast wall. Wood produced the open pit mine designs that include interim and final phases using these recommendations. SRK completed a geotechnical review of the updated mine designs, which is discussed in Section 13.10. The estimated annual average pit inflow, discussed in Section 13.9.7, has been updated based on the review of the new open pit designs.

  
Arctic ProjectPage 248
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

13.9.1Data Sources

 

SRK has conducted geotechnical and hydrogeological drilling programs to collect information to support the Arctic Project. The locations of the drill holes are presented in Section 7.2.4.

 

13.9.2Geology and Structure

 

The talc alteration occurs as continuous to semi-continuous massive bands that locally host economic mineralization many meters thick to much thinner (2 to 20 cm) bands parallel to the dominant foliation within more competent quartz-mica and quartz-chlorite mica schists. Both occurrences represent potential weak or slip foliation parallel surfaces. Trilogy developed talc wireframes delineating the spatial distribution and extent of the main talc-rich horizons.

 

These wireframes have been updated by SRK as the talc-rich horizons have been further delineated by additional drilling completed in 2021 (Figure 13-12). The focus of the update was to refine the geometry of talc layers that extend behind the northeast and east walls of the designed open pit. The entire talc model is planned to be updated in next phase of the engineering study with the results of the 2022 drill program. These talc wireframes were used in the geotechnical and hydrogeological assessments.

 

Figure 13-12: Isometric View (looking southeast) of Talc Zone Domain Modelled by SRK (2022) Using Leapfrog on the EoY12 design pit

 

 

 

Note: Only talc layers that extend behind the final pit wall are shown. Source: Wood, 2019.

 

Pervasive weathering is present in the upper levels of the Arctic deposit. SRK has reviewed the geotechnical data and core photographs in order to define a base of weathering isosurface that represented the boundary of the upper, more pervasive weathering.

  
Arctic ProjectPage 249
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

In 2019, SRK updated the 3-D structural model by integrating new structural drill hole data into the model, refining existing structures and modelling additional faults. The “structural matrix”, which provides information on the geometry, physical properties and confidence of major and minor structural features, was also updated. The final structural model is shown in Figure 13-13.

 

Figure 13-13: SRK Structural Model (SRK, 2019) used in the Slope Stability Analysis on the EoY12 Design Pit

 

 

  

Source: SRK, 2022.

 

Six structural and geomechanical domains were identified (Figure 13-14). These domains, each containing representative discontinuity sets and major structures, formed the basis of the kinematic assessment.

  
Arctic ProjectPage 250
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Figure 13-14: Location Plan, Structural and Geomechanical Domains

 

 

  

Source: SRK, 2022.

 

13.9.3Geotechnical Laboratory Testing

 

The historical open pit geotechnical laboratory testing database includes uniaxial compressive strength (UCS) tests, modulus tests for Young’s Modulus and Poisson’s Ratio, triaxial compressive strength (TCS) tests, direct shear (DS) tests, and tilt table tests. The testing programs were directed by SRK (2015, 2016, 2019, 2021), BGC (2012), and URSA (1998) and completed at accredited laboratories in North America that follows industry best practices. SRK reviewed the testing database and utilized reliable and valid test results to derive representative compressive and shear strength values of the intact rock and discontinuities of the Arctic rock mass.

 

Strength anisotropy is known to exist as a result of foliation fabric through the various lithologies in the Arctic rock mass. UCS and TCS tests that have failed primarily along foliation fabric were rejected to minimize the influence of anisotropy to the intact rock strength. The mean and standard deviation values of UCS test results considered for geotechnical assessments are presented in Table 13-21.

  
Arctic ProjectPage 251
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

The shear strength of discontinuities and the foliation rock fabric were assessed using DS and tilt table tests (Table 13-22). The test results suggest a variation in the friction angle between different lithologies and discontinuity orientations. After examining the laboratory test results, the peak friction angles of foliation fabric and other discontinuities, respectively, were characterized as 24° and 27°. These values represent the Arctic rock mass excluding the Talc Zone domain.

 

The Talc Zone domain consisting of talc schist (TS) and chlorite-talc schist (ChTS), is the weakest rock type (outside of fault zones) observed at the Arctic deposit. The domain is characterized by low intact rock strength, well developed fabric and low shear strength discontinuity surfaces. The shear strength, extent and persistence of the unit is considered a risk for pit slope stability and was the target of the 2021 and 2022 geotechnical drilling programs.

 

A geotechnical laboratory testing program dedicated to determining the shear strength of the weakest talc layers within the Talc Zone rock mass domain was completed in 2021. The program included both rock and soil TCS and DS tests. Available historical shear strength tests on talc were reviewed using before and after test photographs, and data points interpreted as invalid, or outliers, were removed from the analysis. The assessment indicates that the talc has an approximate peak friction angle of 11° and cohesion of 30 kPa (Figure 13-15). Additional laboratory tests utilizing core samples from the 2022 drilling program is in progress.

 

Table 13-21: Summary of Unconfined Compressive Strength by Lithological Units

 

   Unconfined Compressive Strength 
      UCS (MPa)  Young’s Modulus (GPa)  Poisson’s Ratio 
Litho Code  Valid Results Count  Average  Std Dev  Average  Std Dev  Average  Std Dev 
AMR  5  88  61  22  9  0.19  0.06 
CHS  2  20  -  4  -  0.23  - 
DIKE  2  62  -  19  -  0.25  - 
DM  3  71  -  22  -  0.25  - 
GS  14  97  22  24  11  0.14  0.06 
MRP  9  73  19  18  -  0.21  - 
MS  6  56  20  24  11  0.25  0.04 
QFMS  5  64  15  19  6  0.25  0.05 
QMS  5  50  7  15  6  0.21  0.03 
QMSp  2  62  -  20  -  0.23  - 
SMS  3  68  -  24  -  0.21  - 
TS  2  1* -  0.9  -  -  - 
ChTS  2  13* -  3  -  -  - 

 

* TS and ChTS average UCS values were derived using triaxial confinement test data

 

Source: SRK, 2020

  
Arctic ProjectPage 252
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Table 13-22: Shear Strength Laboratory Test Results Excluding Talc Samples

 

Hole ID  From (m)  To (m)  Lithology  Test Type(1)  Peak Friction Angle (°)
Natural Surface
  Base Friction
Angle (°) Saw Cut
  Base Friction
Angle (°) Tilt Table
 
AR15-0139  250.66  250.86  CHS  DS  23.7  -  - 
AR15-0139  231.43  231.67  CHS  DS  17.2  -  - 
AR19-0171  103.29  103.52  CHS  DS  7.7  -  - 
AR11-0128  118.18  118.42  GS  DS  22.6  -  - 
AR11-0129  177.12  177.52  GS  DS  32.5  -  - 
AR11-0129  221.67  222.05  GS  DS  34.2  -  - 
AR11-0130  161.04  161.44  GS  DS  23.5  -  - 
AR15-0140  115.97  116.19  GS  SC  -  -  25.3 
AR15-0142  47.20  47.4  GS  SC  -  -  24.1 
AR19-0165A  159.36  159.64  MRP  DS  18  -  - 
AR15-0142  82.46  82.68  MRP  SC  -  22.1  23.3 
AR15-0140  134.39  134.64  MRP  SC  -  -  24.1 
AR15-0143  36.72  36.97  MRP  SC  -  -  24.6 
AR19-0166  286.16  286.39  MRP  SC  -  -  27.0 
AR16-0149  156.80  157.01  MS  DS  24.5  -  - 
AR16-0149  159.93  160.13  MS  DS  29.9  -  - 
AR15-0139  75.30  75.51  QFMS  DS  22.1  -  - 
AR11-0127  150.63  150.88  QFMS  DS  29.1  -  - 
AR19-0168  198.68  198.95  QFMS  DS  25.6  -  - 
AR19-0167  163.03  163.23  QFMS  DS  12  -  - 
AR19-0164  138.78  138.96  QFMS  SC  -  -  29.4 
AR19-0165A  216.69  216.97  QFMS  SC  -  -  25.8 
AR19-0168  50.53  50.75  QFMS  SC  -  -  25.0 
AR19-0168  139.94  140.17  QFMS  SC  -  -  23.0 
AR19-0171  211.59  211.85  QMS  DS  21.8  -  - 
AR15-0139  184.65  184.92  QMS  SC  -  24.1  23.3 
AR15-0137  200.45  200.69  QMS  SC  -  -  26.3 
AR15-0145  219.34  219.57  QMS  SC  -  -  24.0 
AR19-0165A  105.13  105.38  QMS  SC  -  -  26.7 
AR19-0171  129.77  130.02  QMS  SC  -  -  28.2 
AR11-0130  141.10  141.65  QMSp  DS  21.2  -  - 
AR11-0130  149.84  150.29  QMSp  DS  31.4  -  - 
AR16-0149  154.18  154.48  SMS  DS  19.9  -  - 

 

Source: SRK, 2020

  
Arctic ProjectPage 253
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Figure 13-15: Talc Geotechnical Laboratory Testing Results

 

 

 

Source: SRK, 2022

 

13.9.4Rock Mass Assessment

 

Based on similar geotechnical conditions, most lithological units have been grouped together into broad domains represented by the Upper and Lower Plates that are separated by the Warm Springs Fault. The exceptions to these groupings are the weaker talc units, shallow weathered material, and fault zones. The following rock mass domains were defined:

 

•Upper Plate

 

•Lower Plate

 

•Weathered

 

•Talc Zone

 

•Fault zones

  
Arctic ProjectPage 254
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Mean rock mass parameter values and ranges were defined for each rock mass domain (e.g., fracture frequency, rock mass rating). Particular attention was paid to the assessment of intact rock strength within the defined rock mass domains. Laboratory strength testing, supported by point load testing and empirical field estimates, suggests that strength within the various lithological groups of the Upper and Lower Plates is reasonably homogeneous (Table 13-23).

 

Table 13-23: Summary of Derived Rock Mass Parameter Values per Rock Mass Domain

 

Domain  RQD (%)  FF/m  UCS
MPa
  RMR89 Joint
Condition

(0-30)
  RMR89  GSI  Ei
(GPa)
   mi 
Upper Plate  85-95  1-4  50-60  20  60-70  55-65  18   18 
Lower Plate  75-85  2-5  50-60  19  55-65  50-60  18   18 
Weathered  45-55  10-20  40-50  16  40-50  35-45  18(1)  13(1)
Talc Zone(2)  20-40  25-40  1-10  10  20-30  15-25  4   6 
Faults  0-20  > 40  30-40  16  30-40  25-35  -(3)  -(3)

 

(1) Estimated parameter after BGC (2012) 

(2) The rock mass parameters for Talc Zone are representative of the talc rock mass but not the talc layer itself 

(3) No data available; estimated for stability assessments

 

13.9.5Kinematic Stability Assessment

 

A complete assessment of bench and inter-ramp kinematic stability was undertaken. Full descriptions of toppling, planar, and wedge instability risks were developed per structural domain and design sector.

 

The most significant discontinuity sets, in terms of limiting slope angles, are related to shallow to intermediate dipping S1/S0 (foliation) fabric, which impacts the northeast, east and southeast slopes.

 

13.9.6Hydrogeology

 

Hydrogeological investigations and assessments were completed for both the open pit and valley bottom water/waste management areas.

 

Hydrogeological data are available from 39 boreholes (Figure 7-13); 15 in the area of the open pit area and 24 in the valley bottom area, comprising:

 

•Hydrogeologic testing data from 50 packer-based hydraulic tests; 11 slug tests; two pumping tests in valley bottom, each with an observation well; three injection tests in pit area, one of six hours duration and two greater than 24 hours, each with monitoring at nearby vibrating wire piezometers (VWPs) (SRK 2017, SRK 2020, SRK 2022); 122 particle size distributions from test pits in valley floor (SRK 2020).

 

•Water level data from 25 VWPs in pit area; 3 standpipe piezometers (a fourth piezometer is planned to be installed in 2022) in the pit area;12 water level dataloggers in valley bottom (SRK 2017, SRK 2020, SRK 2022).

 

•Dedicated ground temperature cables at six locations in valley floor; temperature from all VWP sensors, including those in the open pit area (SRK 2020).

 

•22 monitoring wells and two pumping wells in valley bottom; three standpipe piezometers in pit area (SRK 2020).

  
Arctic ProjectPage 255
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

These data were collected following industry best practices. The data collected using the techniques described above have been used to develop conceptual models for the project area and hydrostratigraphic units:

 

Overburden is thickest in the valley bottom, typically ranging between 10 m to 20 m with localized areas of 25 m or more. It is comprised of colluvium and glacial till. On the valley sides, and in the area of the pit, overburden thickness is relatively minor, typically around 5 m or less. In the open pit area, the hydraulic conductivity (K) of the overburden ranges between 6x10-7 and 9x10 5 m/s, with a geomean of 4x10-6 m/s. In the valley bottom the K varies between 6x10-7 and 9x10-5 m/s, with a geomean of 5x10-6 m/s.

 

Weathered bedrock, defined as bedrock with enhanced permeability due to weathering or isostatic rebound post-glaciation, typically ranges between 0 m to 60 m thickness based on available drill hole data. Specific testing of weathered bedrock was completed in valley bottom drill holes; presence of weathered bedrock in the pit area was inferred from logging. The K in the weathered bedrock in both the open pit and valley bottom ranges between 6x10 8 m/s and 4x10-5 m/s, with a geomean of 5x10 7 m/s.

 

Competent bedrock encompasses all lithologic units, in both the valley bottom and pit areas, with sub-units that include upper and lower fractured bedrock (upper and lower are relative to talc position); talc unit; fault barriers; fault conduits. In the open pit area, the K varies between 2x10-9 m/s and 5x10-5 m/s with a geomean of 7x10 8 m/. In the valley bottom area, the K is interpreted to be primarily related to fractures and ranges between 2x10-9 m/s and 4x10-5 m/s, with a geomean of 7x10 8 m/s.

 

The talc unit is present in the pit area, with relatively low hydraulic conductivity and is considered an aquitard, but the aquitard is likely discontinuous based on talc distribution and thickness.

 

Testing of specific geological structures was completed in the pit area. Results range from similar to surrounding bedrock to higher or lower permeability (K). No continuous, relatively high or relatively low permeability structures were identified.

 

The hydrogeological conceptual model for valley bottoms is relatively simple. Overall water flow directions are similar to the topography, with the majority of water flow at relatively shallow depth in overburden or weathered bedrock flowing towards valley bottoms. In the valley bottom, overburden heterogeneity exists, with flow occurring within relatively coarser grained, higher hydraulic conductivity units and weathered bedrock. The majority of groundwater flow in the Subarctic Creek watershed is assumed to discharge to Subarctic Creek. Flow within competent bedrock is much lower in magnitude.

 

In the valley bottom, the outstanding data gap is hydrogeological characterization of overburden and fractured rock in the specific area of the proposed valley bottom groundwater seepage interception system. The characterization program should include completion of monitoring wells down gradient of this system to allow for development of baseline groundwater quality conditions.

 

Figure 13-16 presents the conceptual hydrogeological model for the pit area. Overall flow directions follow topography, with flow systems all within the competent bedrock hydrostratigraphic unit, with the talc, upper and lower fractured bedrock and structures sub-units present. Hydraulic gradients are downwards from the upper fractured bedrock sub-unit to the lower fractured bedrock unit, separated by the talc aquitard. The lower fractured bedrock unit is confined at lower elevations, with the potentiometric surface above the talc sub-unit. Water levels are assumed to vary seasonally, with highest levels occurring as a result of freshet snow melt and or spring/summer precipitation.

  
Arctic ProjectPage 256
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Figure 13-16: Summarized Hydrogeological Conceptual Model for Pit Area

 

 

 

Source: SRK, 2022

 

13.9.7Pit Inflow

 

Pit inflow and pore pressure conditions for the 2019 mine designs were assessed using numerical and analytical tools. Comparison of the 2019 mine designs with 2022 mine design showed relatively minor differences, focused primarily in the area where the pit floor will be mined below the talc for slope stability purposes.

 

Considering the relatively minor differences, inflow estimates for the 2022 mine design were scaled from previous estimates using comparisons of the footprints, elevations, and bottom depths for open pit designs at different phases. Table 13-24 summarizes estimated pit inflow for three cases reflecting the range of hydraulic conductivity and groundwater recharge that could be expected based on data and modelling. The “Base Case” estimate reflects groundwater model runs with parameters calibrated to average stream baseflow conditions. “Low Case” and “High Case” estimates reflect model runs with parameters calibrated to minimum and maximum baseflow conditions, respectively. Estimates of pit wall runoff, reflecting direct precipitation on the pit, were obtained from the site wide water balance model, using a runoff coefficient of 0.9. The presented values are annual averages; shorter duration higher peak flows and periods of lower inflow can be expected to occur.

 

Pit inflows are expected to be low magnitude, relative to many other projects worldwide, and flows of this magnitude can be handled with in-pit sumps. It was assumed that sumps would be positioned at the lowest elevation points in the pit. Perimeter dewatering wells are not considered necessary for this scale of flow. A trend of increasing hydraulic conductivity with depth appears to occur at this site. As the pit advances into later years and gets deeper, in-pit dewatering wells may be beneficial.

  
Arctic ProjectPage 257
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Detailed design of dewatering capacity needs to consider:

 

•Normal duty pumping capacity based on estimated pit inflow rates.

 

•Event pumping capacity based on the highest of design hydrological event (e.g., 1 in 20, 24-hour precipitation), annual freshet flow, or 2x normal duty capacity.

 

•Pit sumps sized based on event pumping capacity/volume.

 

It is the QP’s opinion that characterization of and assumptions for aquifer and aquitard parameters (i.e., permeability, recharge) used in groundwater models used to estimate inflows follow industry best practice, have an acceptable water balance and are appropriate for this level of study.

 

Table 13-24: Estimate Pit Inflow

 

    Average Yearly Pit Groundwater Inflow (m3/d)      
Mining Year   Low Case   Base Case   High Case   Pit Wall Runoff
(m3/d)
  Base Case Total Inflow
(m3/d)
 
02   130   300   650   1890   2190  
05   150   350   770   2410   2760  
07   160   370   830   2830   3200  
09   160   400   900   3140   3540  
11   170   420   950   3320   3740  
13   180   440   990   3320   3760  

 

13.9.8Pore Pressure

 

Pore pressure influences on slope stability analyses were assessed through combinations of hydrogeological modelling and geotechnical stability modelling. Pore pressures were estimated with four 2-D cross-sectional models that represented the four geotechnical sections used to evaluate slope stability. Conservative model assumptions were used considering the risks posed by the low shear strength of the talc, and uncertainties with hydrogeological conditions (i.e., lateral extent of the hydrostratigraphic zones above the talc, vertical leakage rates between units above and below the talc, and presence of geological structures acting as barriers or conduits).

 

Sensitivity to model assumptions were tested including variations to hydraulic conductivity of the fractured rock, specific storage, specific yield, as well as to anisotropy within the fractured rock and presence of impermeable geological structures. Results suggested highest sensitivity (as measured via changes in water table distribution and hydraulic head) related to anisotropy and the addition of impermeable geological structures.

 

Based on slope stability assessments, it is the QP’s opinion that pore pressures could pose stability risks under two conditions:

 

●Stability analyses indicate that slopes along geotechnical section E (SRK, 2022), in the northeast and east walls of the pit are sensitive to potential planar sliding on talc or foliation. Elevated pore pressures in these areas would exacerbate this condition. If pore pressure in these areas does not drain naturally as mining advances, active depressurization should be implemented.

  
Arctic ProjectPage 258
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

●Compartmentalization by sub-vertical structures could impede natural drainage of the slopes, potentially leading to localized stability issues. Specific areas where this could occur have not been identified in the available data but are possible.

 

A conceptual pore pressure monitoring system and mitigation plan for the area of geotechnical section E was developed and is presented in Figure 13-17. Assumptions used for this plan are based on the hydrogeological conceptual model and results of hydrogeological testing. The system must be capable of maintaining pore pressure targets during freshet high flow conditions and operate under winter freezing conditions. The plan is sufficient to support the current level of study but should be reviewed as additional information becomes available, and mitigation efforts adapted as appropriate to achieve pore pressure reduction needs.

 

Figure 13-17: Pore Pressure Management Assumptions for East and Northeast Pit Walls

 

 

Source: SRK, 2022.

  
Arctic ProjectPage 259
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

13.9.9Stability Modelling

 

The minimum acceptable factor of safety (FoS) for the planned Arctic open pit varies depending on the pit slope component. Based upon the current plans, there is no major infrastructure set to be constructed proximal to any pit walls. If this were to change, it would be necessary to examine the selected acceptance criteria.

 

Table 13-25 summarizes the selected acceptance criteria for the Arctic pit slope design.

 

Table 13-25: Selected Slope Stability Acceptance Criteria

 

   Acceptance Criteria (1) 
   Static   Dynamic 
Slope
Component
  Minimum
FoS
   Maximum PoF
Displayed as Probability of
FoS ≤ 1 (%)
   Minimum
FoS
   Maximum PoF
Displayed as Probability of
FoS ≤ 1 (%)
 
Bench   1.1   50%  NA   50%
Inter-ramp   1.3   10%  1.1   10%
Overall   1.3   5%  1.1   5%

 

(1) FoS = Factor of Safety and PoF = Probability of Failure

 

Two dimensional (2-D) RS2 modelling, carried out on four sections around the pit, validated the findings from the kinematic assessment and showed that existence of talc layers in the slopes are geotechnical risks. The models suggest that final pit wall slopes are sensitive to the pore pressure when the talc layers are exposed in the pit walls and relatively insensitive to pore pressure in other scenarios. A seismic hazard assessment was incorporated considering the annual exceedance probability of 10% chance of being exceeded in 50 years indicating a peak ground acceleration of 0.26 g for the region of the proposed Artic Pit. The peak ground acceleration used to evaluate the 2-D sections was a conservative 66% of the estimated regional peak ground acceleration for this region, or 0.17 g.

 

Three dimensional (3-D) RS3 modelling focused on analyzing the stability of the east and northeast walls that are designed to be mined to foliation fabric and contain talc layers. These slope areas did not meet the stability design criteria in 2-D but it was anticipated that confinement in 3D would improve slope performance. The effect of pore pressures was not analyzed in 3-D due to limitations with the software when modelling complex groundwater conditions. As with the results of the 2-D findings, the absence of pore pressure in the 3-D model was assumed to be representative if the pore pressure management plan successfully drains the groundwater above the talc zones.

 

The 3-D analysis result suggests that the area in the northeast wall above the Cz Talc Zone is, in terms of stability, the most sensitive slope to shear strength reduction. The resulting SRF of 1.3, although meeting the design criteria, represents an optimistic estimation of the factor of safety as the strengths of the talc zone and foliation could be lower.

  
Arctic ProjectPage 260
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

13.9.10Slope Design

 

Slope design recommendations were based on the findings of the kinematic evaluation, with additional adjustments from the numerical modelling analyses. Hydrogeological influences were considered in the 2-D numerical stability analyses using the predictions of phreatic surfaces in the interim and final pit phases. The models suggested that stability of the northeast and east wall was dependent on full excavation of the talc domains and successful management of the pore water pressures. Inter-Ramp slope design angles were determined for each slope design domain as seen in Figure 13-18.

  
Arctic ProjectPage 261
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Figure 13-18: Recommended Inter-Ramp Angles by Slope Design Domains Projected on EOY12 Design Pit

 

 

 

Source: SRK, 2019.

  
Arctic ProjectPage 262
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

13.10Geotechnical Review of Open Pit Design

 

Wood updated the open pit mine designs to support the Report. The updated design includes four nested phases including the ultimate pit. The notable geotechnical recommendations considered for the mine design update include:

 

•Where slopes are oriented sub-parallel to foliation, conventional bench-berm designs have been adjusted to excavate along foliation design

 

•Slope angle of north wall, above 900 m elevation, has been optimized to account for more favourable orientation of foliation

 

•The east and northeast walls of the interim mining phases do not expose the talc domain

 

•Talc domains are fully excavated in the northeast and east walls of final mining phase

 

13.10.1Slope Stability Risks

  

Based on a high-level geotechnical review, SRK believes that the updated open pit mine designs have honoured the geotechnical slope design recommendations. The review also identified potential slope stability risks for the various mining phases, shown in Figure 13-19, that were assessed using 3D finite element numerical models with simplified geometries and groundwater conditions. It is recommended that these potential risks are considered in the next stages of the Arctic Project.

 

●Potential sliding failure along talc domains and fault structures in the northwest and east walls of Phase01 pit. The 3D stability model results suggest that the east wall in the interim mining phase is stable in dry conditions but the factor of safety falls below the design acceptance criteria when the pore pressures become elevated above the talc domains which could occur seasonally during freshet. This highlights the importance of pit water management plan as well as controlling the amount of snow accumulating within the potential areas of risk. Flexibility in mine sequencing may be required to accelerate the excavations above the talc domains if pore pressures can’t be controlled.

 

●Interaction of talc domains and discontinuities to form potentially unstable multi-bench wedges in the south walls of Phase02, Phase03 and Final pit designs. 3D numerical model results show that multi-bench scale failure is unlikely but elevated pore pressures could exacerbate the conditions. Localized blocks could fail along the bench crest and rockfall risk should be considered in these areas.

 

●Sliding failures along foliation are expected where the slope orientation changes abruptly in the final east wall. Slope design adjustment is recommended to remove any convex slope shapes in the elevated risk areas.

  
Arctic ProjectPage 263
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Figure 13-19: Potential Areas of Slope Instability Risks in the 2022 Open Pit Designs

 

 

  

Source: SRK, 2022

  
Arctic ProjectPage 264
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

13.11Geochemistry Assessment

 

13.11.1Acid Base Accounting Studies

 

Five geochemical sampling campaigns in 1998, 2010, 2013, 2015 and 2016 resulted in accumulation of a dataset of 1,557 samples tested using various methods. In January 2017, following a large (1004 sample) infill sampling campaign in 2016, Trilogy consolidated the databases, which enabled SRK to use the geochemical database and mineralogical data to develop site-specific methods for acid potential (AP) and neutralization potential (NP) (SRK 2019).

 

About 75% of samples were classified as potentially acid generating (PAG), which is defined as total sulphur content >0.1% and NP/AP<2 where NP and AP are calculated using site-specific methods. Acid rock drainage (ARD) potential occurs in all rock types to varying degrees. Ore and the associated Gray Schist have the strongest ARD potential, followed by felsic schists. The rock types with weaker ARD potential are chlorite talc schist and metarhyolite porphyry.

 

In 2017 2019, and 2022 tailings generated by metallurgical testing were tested for acid-base accounting (ABA) methods and found to have potential for acid generation.

 

13.11.2Geochemical Kinetic Studies

 

13.11.2.1Waste Rock Program

 

Geochemical kinetic testing using six rock type composites was initiated in 2015. The composites were used to fill seven barrels (including one duplicate) at the site with 240 to 270 kg of waste rock in each test. Leachates from the barrels were collected and tested once in 2015 and three to five times during each summer from 2016 through 2019, and 2021 to 2022. Parallel laboratory humidity cells were also initiated in 2015 and are evaluating the weathering behaviour of the composites. Three of the humidity cells are still operating and had reached 370 weeks as of November 30, 2022, and three of the humidity cells were terminated in 2021/2022 as weathering rates were stable.

 

An additional 10 waste rock humidity cell tests (HCTs) were initiated in 2019, and a further two were initiated in 2021. While the tests initiated in 2015 generally represented typical compositions of the main waste rock types in terms of sulphur content, the tests initiated in 2019 and 2021 were designed to represent the range of compositions present for key parameters such as selenium and sulphur, including some tests that would represent “worst case” conditions. The humidity cells initiated in 2019 had been operating for 184 weeks as of November 14, 2022, with the exception of three of the tests which were terminated in 2021/2022 as weathering rates were stable. The tests initiated in 2021 had been operating for 92 weeks as of November 14, 2022.

 

All of the kinetic samples (from the 2015, 2019 and 2021 programs) have the potential to generate acid. To date, ten HCTs have generated acid (pH<5) including samples from all the main rock types. A further four tests had pHs that were most recently between pH 5.0 and 6.5 indicating that carbonate minerals have likely been exhausted and acid generation is buffered by silicate minerals. pH is expected to continue declining in the tests. The remaining four tests had recent pHs around 7.0 and were likely still buffered by carbonate minerals. The testwork has provided data on metal release rates under acidic and non-acidic conditions which have been used to estimate waste rock contact water composition.

  
Arctic ProjectPage 265
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

13.11.2.2Tailings Program

 

Kinetic testing of tailings from the 2017 metallurgical test program was completed late in 2020 (conducted for 193 weeks). Tailings from the 2019 and 2022 metallurgical test programs has been in operation for 172 weeks and 30 weeks respectively (as of November 14, 2022). Testing includes HCTs, and the 2019 and 2022 tailings are also undergoing subaqueous column testing. None of the tests have generated acid and recent pHs are above 7.0. The HCT testwork has provided data on metal release rates under non-acidic conditions which have been used to estimate contact water composition of tailings upon exposure to subaerial weathering. Subaqueous column results are used for predicting tailings water chemistry during operations and upon closure as water is drawn down in the TMF and porewater is released during tailings consolidation.

 

13.11.2.3Ore Program

 

Kinetic testing of ore composites was initiated in 2019 and 2022. The 2019 HCT was terminated in 2021 after 112 weeks of operation. The test initiated in 2022 had been operating for 30 weeks as of November 14, 2022. The samples had not generated acid and pHs were above 7.0. The testwork has provided data on metal release rates under non-acidic conditions which have been used to estimate the ore contact water composition. 

  
Arctic ProjectPage 266
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

14Processing and Recovery Methods

 

14.1Overview

 

The current process plant design is updated from the 2020 Arctic Feasibility Study Technical Report (2020 FS) by considering the verification testwork conducted by ALS in 2022, along with process optimization based on Ausenco’s benchmark database. The process plant will operate two 12-hour shifts per day, 365 day a year, with an overall plant availability of 92%. The process plant will produce three concentrates: 1) copper concentrate, 2) zinc concentrate, and 3) lead concentrate. Gold and silver are expected to be payable at a smelter and are recovered in both the copper and lead concentrates.

 

The process is developed to treat the MS and SMS ores from the Arctic deposit hosted in the Ambler Sequence within a VMS belt. The deposit mineralisation occurs as stratiform SMS to MS beds within graphitic chlorite schists and quartz mica schists. The mined material will be comminuted via a primary crushing circuit and a grinding circuit configured in semi-autogenous ball (SAB) mode. Due to the significant levels of talc contained in the mined materials (2.92% in the plant feed), a talc flotation is required to remove the mineral. This is then followed by a bulk flotation of a copper and lead concentrate, and the subsequent separation of copper and lead concentrate. At this stage, flotation of a zinc concentrate process takes place to produce the three flotation concentrates. The talc flotation concentrate and the zinc tailings will be combined and thickened before discharged to the tailings storage facility.

 

The overall circuit consisting of crushing, grinding and flotation to generate the respective metallic concentrates is based on the optimal process route to produce saleable concentrates from the ores in the Arctic deposit. This process flowsheet is shown in Figure 14-1. Figure 14-2 shows a plan of the overall plant area and Figure 14-3 shows a general arrangement of the process plant area. 

 

14.2Process Flowsheet and Area Plan

 

The process plant will consist of the following unit operations:

 

•Primary (jaw) crushing;

 

•Course ore stockpile;

 

•SAG and ball mill grinding:

 

○primary grinding using an open circuit semi-autogenous grinding (SAG) mill; and

 

○secondary grinding using a closed-circuit ball mill.

 

•Talc pre-flotation;

 

•Bulk copper and lead flotation;

 

•Copper and lead separation flotation;

 

•Zinc flotation;

 

•Thickening, filtration, and loading of copper, lead, and zinc concentrates;

 

•Cyanide destruction; and

 

•Tailings thickening and disposal.

  
Arctic ProjectPage 267
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Figure 14-1: Process Plant Flowsheet

 

 

  

Source: Ausenco, 2022.

  
Arctic ProjectPage 268
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Figure 14-2:Overall Plant Area Plan

 

 

 

Source: Ausenco, 2022.

 

  
Arctic ProjectPage 269
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

 

   
   

  

Figure 14-3:Process Plant Plan

 

 

 

Source: Ausenco, 2022.

 

  
Arctic ProjectPage 270
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

 

   
   

 

14.3 Process Design Criteria

 

The process plant is designed for a throughput of 10,000 t/d, equivalent to 3,650,000 t/a. The key process design criteria considered for the design and selection of equipment for the processing facilities are listed in Table 14-1 and the comminution parameters are provided in Table 14-2. The process plant design is based on a robust metallurgical flowsheet developed for optimum recovery.

 

Table 14-1: Process Design Criteria - Overview

 

Criteria   Unit   Value
Plant Design Capacity   t/a   3,650,000
  t/d   10,000
Operating Availability - Crushing   %   65
- Grinding and Flotation   %   92
- Concentrate and Tailings Filtration   %   84
Process Plant capacity, nominal @ 92% availability   t/h   453
ROM Specific Gravity   -   3.25
Plant Feed Grades - Copper, Design   %   3.00
- Lead, Design   %   0.74
- Zinc, Design   %   4.20
- Gold, LOM Average   g/t   0.47
- Silver, LOM Average   g/t   35
- Talc, LOM Average   %   8

 

Table 14-2: Comminution Design Criteria

 

Criteria   Unit   Value
Crushing (Single Stage)        
Availability   %   65
Primary Crusher   Type   Jaw Crusher
Crushing Feed Size, 80% Passing   mm   504
Crushing Circuit Product Size, 80% Passing   mm   80
Grinding        
Availability   %   92
Circuit Type   -   SAG Mill, Ball Mill
Bond Ball Mill Work Index, Design   kWh/t   11.6
Bond Abrasion Index, Design   g   0.038
A x b, design   -   109
Feed Particle Size, F80   mm   80
Product Particle Size, P80   µm   70
Regrinding Circuit Product Size, 80% Passing - Bulk Rougher Concentrate   µm   40

  
Arctic ProjectPage 271
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Design criteria for the flotation plant were determined from the testwork conducted by ALS Metallurgy (described in Section 13) and is summarized in Table 14-3.

 

Table 14-3: Flotation Plant Design Criteria

 

Criteria   Unit   Value
Feed Rate   t/h   453
Pre-Flotation        
Cell Type   Type   Conventional Tank Cells
Stage Recovery to concentrate, mass   % flotation feed   21.5-25.7
Stage Recovery, talc   %   88.6
Copper-Lead Bulk Rougher Flotation        
Cell Type   Type   Jameson Cell
Stage Recovery to concentrate, mass   % flotation feed   12.7-15.0
Regrind Mill        
Type       Ball Mill
Feed Rate, design   t/h   68
Feed Particle Size, F80   µm   63
Product Particle Size, P80   µm   40
Specific Grinding Energy (SGE)   kWh/t   9.2
Copper-Lead Cleaners       3 stages
Cell Type   Type  

Conventional Tank Cell – Stage 1 & 2

Jameson Cell – Stage 3

Stage Recovery to Concentrate, mass   % Flotation feed   16.1-18.6
Stage Recovery, Copper   %   92.1
Stage Recovery, Gold   %   52.0
Stage Recovery, Silver   %   32.5
Lead Rougher Flotation        
Cell Type       Conventional Tank Cells
Stage Recovery to concentrate, mass   % flotation feed   1.7-2.5
Lead Cleaners       3 Stages
Cell Type       Conventional Tank Cell
Stage Recovery to concentrate, mass       2.6-3.6
Stage Recovery, Lead   %   61.3
Stage Recovery, Gold   %   21.6
Stage Recovery, Silver   %   48.6
Zinc Rougher Flotation        
Cell Type       Conventional Tank Cell
Stage Recovery to Concentrate, mass   % flotation feed   7.4-8.8

  
Arctic ProjectPage 272
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Criteria   Unit   Value
Zinc Regrind Mill        
Type       Ball Mill
Feed Rate, design   t/h   40
Feed Particle Size, F80   µm   63
Product Particle Size, P80   µm   40
Specific Grinding Energy (SGE)   kWh/t   9.2
Zinc Cleaners       3 Stages
Cell Type      

Conventional Tank Cell – Stage 1 & 2

Jameson Cell – Stage 3

Stage Recovery to concentrate, mass       11.
Stage Recovery, Zinc   %   88.5
Stage Recovery, Gold   %   3.3
Stage Recovery, Silver   %   5.7
Concentrate Handling        
Copper Concentrate        
Type       Hi-rate
Unit Area Thickening rate, design   t/m2.h   0.25
Thickener Underflow Density   %w/w   65
Copper Concentrate Filter        
Type       Horizontal plate pressure filter
Filtration Rate   kg/m2/h   575
Nominal Filter Cake Moisture   %w/w   6
Lead Concentrate        
Type       Hi-rate
Unit Area Thickening rate, design   t/m2.h   0.2
Thickener Underflow Density   %w/w   65
Lead Concentrate Filter        
Type       Horizontal plate pressure filter
Filtration Rate   kg/m2/h   800
Nominal Filter Cake Moisture   %w/w   6
Zinc Concentrate        
Type       Hi-rate
Unit Area Thickening rate, design   t/m2.h   0.25
Thickener Underflow Density   %w/w   65
Zinc Concentrate Filter        
Type       Horizontal plate pressure filter
Filtration Rate   kg/m2/h   555
Nominal Filter Cake Moisture   %w/w   6

  
Arctic ProjectPage 273
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

14.4Plant Description

 

14.4.1Crushing Plant

 

Run-of-mine ore will be trucked to the crushing station and dumped into a 200-t receiving bin protected with a 1,000-mm-aperture stationary grizzly. Ore will be reclaimed from the bin with an apron feeder and scalped of fines with a 75-mm-aperture vibrating grizzly. The grizzly oversize will be passed to the primary jaw crusher. The selected conventional jaw crusher will operate with a closed side setting of 100 mm. The crushed material together with the grizzly undersize, with a P80 of 80 mm, will be discharged to the conveyor. A tramp metal magnet will be installed at the head end of the conveyor to remove tramp metal.

 

Crushed ore will be sent to a single covered conical stockpile via the stockpile feed conveyor.

 

The major equipment in the crushing circuit will include:

 

•One apron feeder, installed power 30 kW;

 

•One vibrating grizzly, installed power 30kW; and

 

•One single toggle jaw crusher, installed power 160 kW.

 

14.4.2Coarse Ore Storage

 

The coarse ore stockpile will have a live capacity of 5,000 t, equivalent to approximately 12 h of mill feed at the nominal mill feed rate. The stockpile total capacity will be approximately 20,000 t. The coarse ore stockpile will be a covered facility to mitigate freezing of the stockpiled material, which will be also equipped with a dust collecting system. The coarse ore stockpile building will have sufficient space to allow for the operation of mobile equipment as required. Reclaim of ore from the stockpile will be accomplished using two 1,000-mm-wide by 4,800-mm-long apron feeders at a nominal rate of 226 t/h per feeder. Reclaimed material from the apron feeders will be discharged onto the SAG mill feed conveyor.

 

The major equipment of the coarse ore storage area will include:

 

•Two apron feeders, unit installed power 11 kW.

 

14.4.3Grinding and Classification

 

14.4.3.1Primary Grinding and Classification

 

The grinding circuit will consist of a SAG mill followed by a ball mill arranged in a closed circuit with a hydrocyclone cluster. The nominal feed throughput of the circuit will be approximately 453 t/h. The SAB circuit will reduce the crushed ore particle size from a P80 of 80 mm to 70 µm.

 

SAB circuit is selected by considering the low competence of the ore materials. The SAG mill will be a grate discharge type with 12 mm apertures and no pebble ports. As required, steel balls will be added to the SAG mill to maintain mill power. The SAG mill product will discharge onto a trommel screen. Trommel screen undersize will report to a hydrocyclone feed pumpbox and the oversize to a scats bunker.

  
Arctic ProjectPage 274
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

The ball mill discharge will report to the hydrocyclone feed pumpbox, where it will be combined with the SAG mill trommel undersize prior to feeding the hydrocyclone cluster. Process water will be added to the SAG mill feed chute and hydrocyclone feed pumpbox to maintain a target slurry density. The hydrocyclone underflow will feed the ball mill by gravity, while the hydrocyclone overflow, with a solids content of 37%, will gravitate to the flotation circuit. The ball mill circulating load will be 350%.

 

The major equipment of the grinding and classification circuit will include:

 

•One SAG mill, 6.1 m in diameter (20 ft) by 4.9 m (16 ft) EGL, installed power 3,000 kW;

 

•One ball mill, ;6.1 m diameter (20 ft) by 9.1 m (30 ft) EGL, installed power 6,000 kW;

 

•Two 55 kW slurry pumps to pump hydrocyclone feed, with one pump in operation and one in standby; and

 

•One hydrocyclone cluster with fourteen 400 mm hydrocyclones, nine in operation, four in standby and one blank.

 

14.4.4Flotation

 

The flotation plant will produce a talc concentrate for disposal, as well as three payable base metal concentrates for shipment to market and sale. The talc concentrate will be produced prior to base metal flotation to minimize dilution of the base metal concentrates. A standard bulk copper and lead concentrate followed by the flotation of a zinc concentrate will be used in the flotation circuit. The copper and lead in the bulk concentrate will be separated by floating the lead from the bulk concentrate to produce individual copper and lead concentrates.

 

14.4.4.1Talc Pre-Flotation

 

The ball mill hydrocyclone overflow will feed the talc rougher circuit. The talc flotation will be composed of rougher and cleaner flotation stages to float the talc mineral and reject any entrained payable sulphide minerals. The rougher flotation will be performed in the conventional forced-air cells and the cleaner flotation will be performed in a Jameson cell. The talc cleaner concentrate will be pumped to the final tailings.

 

The major equipment in the talc pre-flotation circuit will include:

 

•Four 120 m3 tank cells, unit installed power 93 kW

 

•One Jameson cell (B4500/12).

 

14.4.4.2Copper – Lead Bulk Flotation and Regrinding

 

The talc pre-flotation tailings will be pumped to the copper/lead bulk flotation conditioning tanks where copper and lead mineral collectors will be added. The conditioned slurry will undergo rougher flotation in conventional tank flotation cells for recovery of a bulk copper and lead concentrate.

 

The bulk rougher concentrate will be reground in a 600 kW regrind ball mill configured in reverse, closed circuit with hydrocyclones. The bulk rougher concentrate will be reduced to a particle size of 80% passing 40 μm prior to being further upgraded by two stages of cleaner flotation.

 

The 1st bulk cleaner and cleaner scavenger flotation will be conducted in conventional tank cells. The 1st cleaner flotation tailings will gravitate for scavenging of residual copper and lead minerals. Concentrate from the cleaner-scavenger flotation will be pumped to the regrind hydrocyclone feed pumpbox for further regrinding, while the cleaner-scavenger tailings will join the rougher flotation tailings for pumped transfer to the zinc flotation conditioners. The 2nd bulk cleaner flotation will be performed in a Jameson cell to upgrade the concentrate obtained from the last stage. The 2nd cleaner tailings will be reprocessed in the 1st cleaner flotation stage.

  
Arctic ProjectPage 275
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Copper-lead bulk cleaner flotation dilution water and launder sprays will be supplied by a dedicated process-water system. The supply for this system will be a combination of copper/lead bulk thickener overflow and main plant process water.

 

The major equipment in the bulk flotation and regrinding circuit will include:

 

•Five 81 m3 bulk rougher flotation tank cells, unit installed power 75 kW;

 

•One regrind ball mill, 3.0 m diameter by 5.3 m EGL, installed power 600 kW;

 

•Four 37 m3 bulk 1st cleaner flotation tank cells, unit installed power 45 kW;

 

•Three 37 m3 bulk cleaner scavenger flotation tank cells, unit installed power 45 kW; and

 

•One bulk 2nd cleaner flotation Jameson cell (B4500/12).

 

14.4.4.3Copper and Lead Separation Flotation Circuit

 

The bulk 2nd cleaner concentrate will be pumped to the copper-lead separation flotation conditioning tank, where sodium cyanide and lime will be added to supress copper minerals. Lead flotation will be conducted at a pH ranging from 9.0 to 9.5. The conditioned slurry will flow to the conventional lead rougher flotation cells. Frother will be added in the rougher and cleaner flotation cells and lead promoter will be added in the lead rougher concentrate pumpbox to collect lead minerals.

 

The lead rougher concentrate will be further upgraded in three stages of cleaner flotation to produce the final lead concentrate that will report to the lead concentrate thickener. Tailings from the 2nd and 3rd stages of cleaner flotation will gravity flow to the proceeding flotation cell feed boxes. Tailings from the 1st cleaner flotation will be combined with the tailings from the lead rougher flotation to produce the final copper concentrate, which will report to the copper concentrate thickener.

 

The major equipment in the lead flotation circuit will include:

 

•Five 6 m3 lead rougher flotation cells, unit installed power 11 kW;

 

•Five 4 m3 1st cleaner flotation cells, unit installed power 7.5 kW;

 

•Two 4 m3 2nd cleaner flotation cells, unit installed power 7.5 kW; and

 

•One 4 m3 3rd cleaner flotation cell, unit installed power 7.5 kW.

 

14.4.4.4Zinc Flotation and Regrind

 

The copper-lead bulk rougher tailings will be further floated to recover zinc in the zinc flotation circuit, along with the copper-lead bulk cleaner scavenger tailings. The circuit will consist of feed slurry conditioning, rougher/scavenger flotation, zinc rougher concentrate regrind, and two stages of cleaner flotation. A cleaner scalper stage will be installed when the plant feed zinc grade are expected to be higher.

  
Arctic ProjectPage 276
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Tailings from the copper-lead bulk flotation circuit will be conditioned with lime (to a pH above 10.5, to depress pyrite) and copper sulphate (to activate zinc minerals), and then sent to the head cell of a bank of zinc rougher flotation cells. Zinc rougher concentrate will report to the regrinding circuit; zinc rougher tailings will be combined with the Talc concentrate and pumped to the tailings thickener. Thickened tails will be pumped to the Tailings Storage Facility (TSF).

 

The zinc rougher and cleaner scavenger concentrates will be reground in a 355 kW regrind ball mill configured in, closed circuit with hydrocyclones. The zinc concentrates will be reduced to a particle size of 80% passing 40 μm prior to being further processed by the zinc 1st cleaner flotation circuit.

 

The zinc cleaner circuit will operate at a pH of 11 or above to reject pyrite. The 1st cleaner concentrate will be further upgraded in the 2nd stage of cleaner flotation to produce the final zinc concentrate. The 1st cleaner flotation tailings will be further floated in the cleaner scavenger flotation cells. Concentrate from the cleaner scavenger flotation will return to the zinc regrind circuit. The cleaner scavenger tailings will also report to the final tailings pump box, joined by the zinc rougher tailings and talc flotation cleaner concentrate.

 

The main equipment used for the zinc flotation circuit will include:

 

•Five 81 m3 zinc rougher flotation tank cells, unit installed power 75 kW;

 

•One regrind ball mill, 2.7 m diameter by 4.1 m EGL, installed power 355 kW;

 

•Four 23 m3 1st cleaner flotation tank cells, unit installed power 37 kW; 

 

•Two 23 m3 cleaner scavenger flotation tank cells, unit installed power 37 kW;

 

•One Jameson flotation cell (E4232/10), Year 1 and Year 7 as 2nd cleaner flotation cell and repurposed to cleaner scalper flotation cell after Year 7; and

 

•One Jameson flotation cell (E2532/6), future installation on Year 7 as 2nd cleaner flotation cell.

 

14.4.5Product Dewatering

 

The copper, lead, and zinc concentrates will report to separate higher-rate thickeners, where flocculant will be added to assist in the settling of the solids. The thickened slurries will be further dewatered by using pressure filters to a design moisture content of 6%. Two identical tower press filters are recommended for the concentrate filtration duties, including one common unit for lead and zinc concentrates dewatering; while another unit is dedicated to dewater the copper concentrate.

 

14.4.5.1Copper Concentrate Dewatering

 

The copper concentrate will be pumped to a 15 m diameter high-rate thickener which is covered for outdoor application. The thickener overflow water will be reused in the lead flotation circuit, along with overflow from lead concentrate thickener. The excess overflow will be treated by a sulphur dioxide-air procedure to destroy residual cyanide Neutralized overflow will be pumped to the tailings thickener, where the thickener overflow will report to the process pond before recycling back to the plant process water system.

 

The copper concentrate thickener underflow at approximately 65% solids density by weight will be pumped to an agitated concentrate stock tank with 24 hours storage capacity prior to the filtration process. The final filter cake design moisture is 6% considering the site climate conditions. The copper concentrate will be discharged into a stockpile, from which front end loaders will load concentrate onto containers for shipment. Filtrate will return to the copper concentrate thickener. The stockpile will be capable of storing up to 4 days of copper concentrate production in case of potential truck haulage interruptions.

  
Arctic ProjectPage 277
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

The main equipment in the copper concentrate dewatering circuit will include:

 

•One 15-m-diameter high-rate thickener, installed power 3.7 kW;

 

•One 84 m2 copper concentrate tower filter press, installed power 105 kW; and

 

•Two 44 m3 cyanide destruction tanks.

 

14.4.5.2Lead Concentrate Dewatering

 

Lead concentrate will be blended with the flocculant solution and discharged to a 6 m diameter high-rate thickener. The thickener underflow containing approximately 65% solids will be pumped to an agitated concentrate stock tank prior to pressure filtration. The concentrate stock tank will have the capacity to contain lead concentrate production for 24 hours. The thickener overflow will be directed to the lead separation circuit for reuse.

 

Lead concentrate will be filtered in a pressure filter which will be designed to alternate between lead and zinc filtration. Use of a single filter, for 2 products, will require automation to ensure there is no lead-zinc cross contamination. The filter discharge will fall on a reversable conveyor which will send the product to the lead concentrate storage area. The filtrated lead concentrate cake with 6% design moisture will be loaded onto concentrate containers for shipment. The filtrate from the filter will return to the lead concentrate thickener feed well. The in-plant lead concentrate storage facility will be capable of storing at least 4 days of lead concentrate production.

 

The main equipment in the lead concentrate dewatering circuit will include:

 

•One 6-m-diameter high-rate thickener, installed power 1.5 kW; and

 

•One 84 m2 tower filter press, shared with zinc concentrate filtration, installed power 105 kW.

 

14.4.5.3Zinc Concentrate Dewatering

 

The final zinc concentrate will be pumped to a 14 m diameter high-rate thickener. Flocculant will be added to improve settling of the concentrate. The thickener underflow, with a solid density of 65%, will be stored in an agitated concentrate stock tank prior to pressure filtration. Thickener overflow will be delivered to the zinc rougher feed. The concentrate stock tank is designed to be capable of containing zinc concentrate production for 24 hours.

 

Zinc concentrate will be filtered in a pressure filter which will be designed to alternate between lead and zinc filtration. Use of a single filter, for 2 products, will require automation to ensure there is no lead-zinc cross contamination. The filter discharge will fall on a reversable conveyor which will send the product to the zinc concentrate storage area. The final filter cake design moisture is 6%. Filtrate from the filtration will return to the zinc concentrate thickener. The zinc concentrate will be loaded onto concentrate containers for shipment. The zinc concentrate storage facility will be capable of storing at least 4 days of zinc concentrate production in case of potential transport interruptions.

 

The main equipment in the zinc concentrate dewatering circuit will include:

 

•One 14-m-diameter high-rate thickener, installed power 5.5 kW; and

 

•One 84 m2 tower filter press, shared with lead concentrate filtration, installed power 105 kW.

  
Arctic ProjectPage 278
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

14.4.6Tailings Disposal

 

The final flotation tailings consist of the talc flotation concentrate, zinc rougher flotation tailings and zinc cleaner scavenger flotation tailings. The final flotation tailings will be directed to a 32 m diameter high-rate thickener. Flocculant will be added to improve settling of the tailings. Thickener underflow with a solid density of 47% will be pumped towards the tailings storage facility. Thickener overflow will be delivered to the Process Pond, from where it will be pumped to the process water tank for distribution to the plant.

 

Water pump barge will be installed to in the tailings pond to reclaim water Tailings water will be pumped to the Process Pond. Water barge pumps will be installed in the Process Pond and will be able to send water to the process water tank or the WTP. Tailings management is discussed further in Section 15.

 

14.4.7Reagent Handling and Storage

 

Various chemical reagents will be added to the grinding and flotation circuits to modify the mineral particle surfaces and enhance the floatability of the valuable mineral particles into the concentrate products. The reagents will be prepared and stored in a separate, self-contained area inside the process plant and delivered by individual metering pumps or centrifugal pumps to the addition points. All reagents will be prepared using WRCP water via a bulk reagent handling system, mixing and holding tanks.

 

Estimated annual reagent consumptions are provided in Table 14-4.

 

Table 14-4:Annual Reagent Consumption

 

Reagent   Unit   Value  
Flocculant   t/a   104  
SIPX   t/a   69  
3418A   t/a   102  
MIBC   t/a   301  
Lime   t/a   3,424  
Descalant   t/a   36  
Cyanide   t/a   1,324  
ZnSO4   t/a   529  
CuSO4   t/a   690  
SMBS   t/a   917  

 

14.4.7.1Collectors

 

Sodium isopropyl xanthate (SIPX) in pellets form will be shipped to the mine site in bulk-bags. The SIPX will be diluted to 20% w/w solution strength in a mixing tank and stored in a holding tank, before being dosed to the copper-lead bulk flotation circuit and the zinc flotation circuit via metering pumps.

 

Collector 3418A will be received as a liquid in Intermediate Bulk Containers (IBC) totes. It will be delivered to the copper-lead bulk flotation circuit via metering pumps without dilution.

  
Arctic ProjectPage 279
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

14.4.7.2Frother

 

MIBC frother will be received as a liquid in IBC totes. The reagent will be used at the supplied solution strength. Metering pumps will deliver the frother to the talc, copper, lead, and zinc flotation circuits.

 

14.4.7.3Lime

 

Lime will be trucked to the site as unslaked pebbles and stored in a 100-t-capacity bulk lime silo. Lime will be conveyed to the lime slaker and slaked with water. The slaked lime will be stored in an agitated mixing tank and distributed to the addition points via a lime slurry loop, to the zinc flotation circuits and WTP. The slaker will be controlled automatically based on the lime slurry levels in the holding tank.

 

14.4.7.4Flocculant

 

Solid flocculant will be prepared in a packaged preparation system, including a screw feeder, a flocculant educator, and mixing devices. Flocculant will be diluted to a 0.5% w/v solution strength and added via metering pumps to the copper, lead, zinc and final tailings thickeners’ feed wells where the reagent will be further diluted.

 

14.4.7.5Other Reagents

 

Sodium cyanide, sodium metabisulphite (SMBS), zinc sulphate, and copper sulphate will be supplied in powder/solid form and will be dissolved and diluted by WRCP water. The strength of the reagent solutions will be approximately 15–20%. Cyanide monitoring/alarm systems will be installed at the cyanide preparation areas. Emergency medical stations and emergency cyanide detoxification chemicals will be provided at the areas as well.

 

Anti-scaling chemicals may be required to minimize scale build-up in the reclaim or recycle water lines. These chemicals will be delivered in liquid form and metered directly into the intake of the reclaim water pumps or process water tank.

 

Storage tanks will be equipped with level indicators and instrumentation to ensure that spills do not occur during normal operation. Appropriate ventilation, fire and safety protection equipment and devices will be provided at reagent preparation areas.

 

14.4.8Power Supply

 

Plant power will be generated on site, with no utility interconnection using diesel generator sets that will be installed to operate in parallel (four operating and one on standby). Each generator will be rated 13.8 kV, 5.5 MW, and the total power output capacity will be 21.6 MW excluding the redundant unit.

 

The total connected load for the plant will be 25.9 MW with a normal operating load of 21.0 MW (~167 GWh/a).

 

14.4.9Water Supply

 

There will be three separate water supply systems: a fresh water system, a WRCP water supply system, and a process water supply system. The contact water will originate principally from the Waste-Rock Control Pond. The total water usage for the process plant is 42,240 m3/d.

  
Arctic ProjectPage 280
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

14.4.9.1Fresh Water Supply System

 

Fresh water will be used for fire water and potable water applications that will be supplied from ground water wells. A 350 m3 fresh water/fire water storage tank will hold well water, with a live capacity of 4 hours.

 

14.4.9.2WRCP Water Supply System

 

WRCP water will be fed to the TMF during winter months and treated and discharged in the summer. Additional process water will be supplied from the WRCP to the TMF through the winter months to meet mill water demands and provide water stored in the TMF as a contingency for dry years. Contact water will also be supplied form the WRCP, which will feed the potable water and gland water tanks.

 

14.4.9.3Process Water Supply System

 

Process water will mainly come from the Process Pond which is fed by tailings thickener overflow and reclaimed water from TMF. In addition, contact water is also another process water source as makeup water. Process water will be stored in a 14-m-diameter x 14-m-high tank, from where the water will be distributed to the process plant and other service locations. The process water consumption is 40,326 m3/d.

 

14.4.10Air Supply

 

Air service systems will supply air to various applications throughout the plant, as follows:

 

•A separate high-pressure air service system will supply air to the crushing plant by a dedicated air compressor. The air will be provided for dust suppression and equipment services.

 

•Flotation and Cyanide Destruction: low-pressure air will be provided for flotation tank cells and cyanide destruction tank by air blowers.

 

•Filtration Circuit: wet high-pressure air will be provided for filtration and drying by air compressors.

 

•Plant Air Service: wet high-pressure air will be provided for various services by dedicated air compressors.

 

•Instrumentation Air: dry high-pressure air will come from the plant air compressors; it will be dried and stored in a dedicated air receiver.

 

14.4.11Assay/Metallurgical Laboratory and Quality Control

 

The final concentrate and intermediate streams will be monitored by one on-stream sample analyser with three multiplexers to analyse a total of 16 streams for metal contents. The measured data will be fed back to the central control room and used to optimize the process operation. Routine samples of head, intermediate products, tailings, and final products will be collected and assayed in the assay laboratory, where standard assays will be performed. The data obtained will be used for product quality control and routine process optimization.

 

The site assay laboratory will consist of a sample preparation facility, a metallurgical laboratory and a full set of assay instruments for base metal analysis as well as gold and silver assays. The metallurgical laboratory will perform metallurgical tests for quality control and process flowsheet optimization. The laboratory will be equipped with laboratory crushers, ball mills, particle size analysis devices, laboratory flotation cells, balances, and pH metres. The assay laboratory will be equipped with the following equipment, including:

  
Arctic ProjectPage 281
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

•Fire assay equipment;

 

•An Atomic Adsorption Spectroscopy (AAS);

 

•An ICP for the routine assay laboratory;

 

•An ICP-MS for the environmental laboratory;

 

•A Leco furnace;

 

•Other determination instruments such as pH and redox potential meters and experimental balances.

 

14.5Personnel

 

The number of process operations and maintenance personnel is provided in Section 18.2.3.4.

  
Arctic ProjectPage 282
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

15INFRASTRUCTURE

 

15.1Introduction

 

The proposed Arctic mine is a greenfield site, remote from existing infrastructure. Infrastructure that will be required for the mining and processing operations will include:

 

•Open pit mine

 

•Stockpiles and WRF

 

•Truck workshop, truck wash, mine offices, mine dry facility and warehouse

 

•Power house

 

•Administration building

 

•Mill dry facility

 

•Plant workshop and warehouse

 

•Primary crushing building

 

•Fine ore stockpile building

 

•Process plant and laboratory

 

•Concentrate loadout building

 

•Reagent storage and handling building

 

•TMF

 

•Diversion and collection channels, culverts, and containment structures

 

•WRCP

 

•Process water pond

 

•Water treatment plants (WTPs)

 

•Camp

 

Figure 15-1 shows the proposed site layout and Figure 15-2 shows the proposed locations of the processing plant, truck workshop and mine offices (collectively referred to as the mine infrastructure area) and administration buildings.

  
Arctic ProjectPage 283
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Figure 15-1: Proposed Site Layout

 

 

Source: Ausenco, 2022.

  
Arctic ProjectPage 284
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Figure 15-2: Proposed Location of the Processing Plant and Other Buildings

 

 

 

Source: Ausenco, 2022.

  
Arctic ProjectPage 285
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

15.2Access Roads

 

The Arctic Project site will be accessed through a combination of State of Alaska owned highways, a proposed AIDEA owned private AAP road, and proposed Trilogy-owned access roads.

 

15.2.1Ambler Mining District Industrial Access Road

 

The Arctic Project assumes that the ADIEA will construct a road connecting the Arctic Project to the rest of Alaska’s transportation infrastructure. The access road is referred to as the AMDIAP or the AAP.

 

There is currently no road access to the Arctic Project area. Access to the Arctic Project area is proposed to be via the AAP road, which is approximately 340 km (211 miles) long, extending west from the Dalton Highway where it would connect with the proposed Arctic Project area. The AAP road will be permitted as a private road with restricted access for industrial use and received a Federal Record of Decision on July 23, 2020, by the Bureau of Land Management (BLM) and the National Park Service (Joint Record of Decision or JROD). Lawsuits were filed shortly thereafter by a coalition of national and Alaska environmental non-government organizations in response to the BLM’s issuance of the JROD for the AAP.

 

On January 6, 2021, BLM, the National Park Service and AIDEA signed Right-of-Way agreements giving AIDEA the ability to cross federally owned and managed lands along the route for the AAP approved in the JROD. During the second quarter of 2021, AIDEA signed a land access agreement with Doyon Limited to conduct feasibility and permitting activities to advance the AAP and in September 2021 AIDEA signed a land access agreement with NANA Regional Corporation, Inc. to conduct similar activities.

 

On February 22, 2022, the United States Department of the Interior (DOI) filed a motion to remand the Final Environmental Impact Statement (EIS) and suspend the right-of-way permits issued to AIDEA for the AAP and in mid-March, the BLM and DOI suspended the right-of-way grant and the right-of-way permit over federal lands.

 

On September 20, 2022, the BLM published in the Federal Register a Notice of Intent that it will prepare a Supplemental Environmental Impact Statement (SEIS) for the proposed Ambler Mining District Industrial Access Road. The BLM anticipates publishing a draft SEIS during the second quarter of calendar year 2023 and a final SEIS within the fourth quarter of calendar year 2023.

 

The lawsuits have been temporarily suspended pending the additional work to be performed by the BLM on the EIS.

 

Figure 15-3 shows the proposed route of the AAP road.

  
Arctic ProjectPage 286
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Figure 15-3: Proposed Route of AAP Road

 

 

Source: Ambler Access Website, 2018.

  
Arctic ProjectPage 287
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

15.2.2Arctic Access Road

 

The Arctic Project envisions the development of two access roads to support the proposed Arctic mine: a southern route that will connect the Dahl Creek airport to the AAP road, and a northern route that will connect the AAP road to the Arctic Mine, as seen in Figure 15-4. Development will include upgrading existing roads and trails and construction of new road segments where they currently do not exist. The roads will be designed to accommodate the types of vehicles expected to serve the intended mine and process plant operations.

 

The south route will be 21.4 km long and will be used to transport employees and air freight from the Dahl Creek airport to the Arctic mine. The first 17 km will generally follow the alignment of the existing road between the airport and the existing exploration camp. The remaining 4.5 km to the junction with the AAP road will require new construction.

 

The north route will be 22 km long and will support operations at the Arctic mine by transporting employees, mining equipment, supplies, and ore concentrate to and from the mine site. Approximately the first 8.8 km of the north route will be new construction across the Ambler lowlands. The remaining 13 km will upgrade an existing undeveloped summer/winter trail, including 7.7 km that extend up a narrow and steep valley to the Arctic mine site.

  
Arctic ProjectPage 288
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Figure 15-4: Arctic Access Road

 

 

Source: Trilogy Metals, 2019.

  
Arctic ProjectPage 289
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

15.3Airstrip

 

The Dahl Creek airport is situated approximately 32 km south of the Arctic deposit. The airport would need to be upgraded with a lighting system and an automated weather observation system to be functional for Project purposes. These upgrades would support the use of Dash 8 aircraft for transporting crew to and from the Fairbanks International airport. The Dahl Creek airport is owned by the State of Alaska, and it is assumed that the upgrades would be accepted if funded by the Arctic Project.

 

New infrastructure that would be associated with the airstrip would include:

 

•Pre-fabricated 90 m2 passenger building to accommodate personnel waiting to depart the site.

 

•Fabric structure approximately 175 m2 in area to accommodate snow-removal and aircraft service equipment.

 

•Precision approach pathway indicators on each end of the runway to aid pilots in acquiring and maintaining the correct approach.

 

•Local utilities such as generator power and water services.

 

15.4Camps

 

The Arctic Project will require the use of three different accommodation camps, with one remaining for permanent operations. Each camp will generally be self-contained and have its own power generation and heating capabilities, potable WTP (PWTP), garbage incineration and sewage treatment plant (STP).

 

15.4.1Bornite Exploration Camp

 

The existing Bornite Camp, which is currently used for exploration, is envisioned to be utilized initially for the Arctic Project. The Bornite Camp can currently hold approximately 90 persons. The Bornite Camp will be used to support the initial construction of the Arctic Access Road, and for the initial construction camp. It is anticipated that the camp will be temporarily expanded with seasonal accommodations to allow for about 30 additional persons during construction. Any improvements or expansion will be based on the same airlift transportation logistics as currently utilized to support the Bornite Camp.

 

15.4.2Construction Camp

 

This initial Construction Camp (CC) will be constructed along the Arctic Mine Access Road approximately 8 km from the intersection of the AAP road and Arctic access road, across the road from the Arctic Mine Junction (AMJ) Logistics Yard. The camp will be constructed to provide room and board for 250 persons. The camp will be designed to operate 365 d/a, and of a modular type that can be transported to the site via the Dalton Highway on a semi-prepared AAP road route prior to full truck access being available to the site. The camp will be self-contained and will be integrated and operated as part of the Permanent Accommodations Facility (PAF). It is anticipated that the CC will be demobilized or shuttered upon the commencement of mill operations and the construction phase requirements completed. The transportation and construction of the CC will include the construction of the permanent PWTP, STP, and Garbage Incinerator that will be eventually used to support both the CC and PAF with a combined total occupancy of 650 persons.

  
Arctic ProjectPage 290
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

15.4.3Permanent Accommodations Facility

 

The PAF will be constructed on the same pad as CC. The PAF will be constructed when the AAP road is available for the transport of the modules, and the pad is upgraded for the permanent construction. The PAF will be located approximately 8 km from the intersection of the AAP road and Arctic access road, and 12 km from the process plant area. The PAF will be operating for approximately 2 years prior to the commissioning of the Arctic mill and production of concentrates. During this period, it will be used to accommodate both construction personnel and the initial Ambler Metals Mine Operations and support personnel required for pre-production mining.

 

An indicative breakdown of personnel onsite during operations is shown in Table 15-1.

 

Table 15-1: Personnel Onsite during Operations

 

Personnel Description   Number of Personnel Onsite
Owner Personnel    
General and Administration   30
Mill Operations   47
Mill Maintenance   101
Mine Operations and Maintenance   135
Contractor Personnel    
Concentrate Trucking Contractor   21
Camp Contractor   29
Other Contractor   8
Other Guests and Non-Employees   7
Total Personnel   378

 

15.5Fuel Supply, Storage and Distribution

 

Diesel will be stored onsite in double-walled steel tanks for use in the power plant at the processing facility and for use in the mine fleet vehicles with a capacity of 30,000 US gallons. A total of 12 horizontal tanks will be used, four tanks within the mine infrastructure area for mine fleet fuel requirements, and eight tanks adjacent to the power plant for generator fuel.

 

The volume stored at the mine infrastructure area will represent nine days of storage and the volume stored at the power plant will represent seven days of storage.

 

15.6Power Generation

 

The plant power supply will be generated on site, with no utility interconnection. A total of five diesel generator sets will be installed to operate in parallel with four operating and one on standby. Each generator will be rated 13.8 kV, 5.5 MW, and the total power output capacity will be 21.6 MW excluding the redundant unit. All five generators will be housed within a shared power plant building; the area adjacent to the building has been left free to allow for addition of a sixth generator in the future if required.

  
Arctic ProjectPage 291
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

15.7Electrical System

 

The primary power distribution will be at 13.8 kV and will run via above ground cable trays to the area electrical rooms. There will be a total of four major electrical rooms, one of which will be part of the power plant building. The remaining three will be prefabricated modularized type buildings that will be shipped with all equipment pre-installed; these will be placed in the grinding, process and crushing areas. The smaller electrical room for the reclaim water barge will be supplied integral with the barge.

 

The total connected load for the plant will be 25.9 MW with a normal operating load of 21.0 MW.

 

15.8Surface Water Management

 

The proposed mine development is in the upper reach of Subarctic Creek valley, a tributary of the Shungnak River. The combination of the climate, terrain, soils and sparse vegetation result in high runoff potential, especially in May and June when soils are still frozen.

 

The catchment area of Subarctic Creek is approximately 25.8 km2. All mine infrastructure and mine affected water is within the Subarctic Creek valley. A surface water management system will be constructed to segregate contact and non-contact water. Non-contact water will be diverted around mine infrastructure to Sub-Arctic Creek. Contact water will be collected and treated prior to discharge to Subarctic Creek.

 

The objectives of the water management system are to:

 

•Ensure sufficient water quantity is available to support processing.

 

•Manage contact and non-contact water separately to minimize volume of contact water collected on site.

 

•Collect and treat contact and high-sediment water that could otherwise impair the water quality of the receiving streams.

 

•Protect mine infrastructure from damage of unmanaged run-off.

 

•Reduce suspended solid loading in surface runoff prior to discharge.

 

•Store process water to provide for mill water needs

 

Water on site will be managed as one of the following:

 

•Non-contact water: non-contact water will be diverted away from mine infrastructure to the extent possible to reduce infiltration into the WRF, TMF inflows, and pit inflows. Non-contact water will be discharged to Subarctic Creek during operations and closure.

 

•Contact water: Contact water will be generated when precipitation or run-on comes in contact with mine waste rock, tailings or is collected in the pit. Contact water is treated prior to discharge to Subarctic Creek.

 

•High-sediment water: High-sediment water (i.e., surface flows from pads and topsoil stockpiles) is collected and conveyed to downstream ponds to treat prior to discharge in Subarctic Creek, during operations and closure.

 

Figure 15-5 and Figure 15-6 illustrate the water management plan for the initial construction phase and the LOM footprint of the Arctic Project.

  
Arctic ProjectPage 292
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Figure 15-5: Surface Water Management Plan During Operations (Year 2)

 

 

Source: SRK, 2022.

  
Arctic ProjectPage 293
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

 

Figure 15-6: Surface Water Management Plan at the End of LOM (Year 13)

 

 

Source: SRK, 2022.

  
Arctic ProjectPage 294
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

15.8.1Process Water Supply

 

Process water, gland water, and reagent make-up water will be supplied from the Process Pond and TMF reclaim. Additional process water will be supplied from the WRCP to the TMF through the winter months to meet mill water demands and provide water stored in the TMF as a contingency for dry years. Table 15-2 summarizes mill water supply throughout the year. The TMF dam, WRCP, and Process Pond will be constructed prior to the processing of ore. A water volume of 1.6 Mm3 will be collected in the TMF prior to operations to supply the mill during start-up. Water that accumulates in the WRCP during construction may need to be treated for suspended solids by a temporary water treatment system.

 

Table 15-2: Process Water Supply Summary

 

Months Supply Source Comments
January to April Process Pond, TMF reclaim water and WRCP Water from the WRCP is pumped to the TMF from January to April. This water is accumulated from groundwater flows during the winter months.
May to December Process Pond and TMF reclaim water No WRCP water is pumped to the TMF. From May to December WRCP water is treated and discharged to Sub-Arctic Creek.

 

15.8.2Water Management Infrastructure

 

Stormwater will be managed within the Arctic Project boundaries by capturing and conveying contact and high sediment water for treatment and diverting non-contact water away from developed areas. Water conveyance and storage facilities proposed include the following structure types:

 

•Diversion and collection channels.

 

•Drop structures, diversion pipes and culverts.

 

•Collection ponds.

 

Soils found within the Arctic Project limits consist of alluvial sands and gravels, with limited fines. Runoff from the overburden stockpile and mill site areas should be mitigated by temporarily seeding or using material to create durable less erodible surfaces to prevent or reduce erosion. In addition, water could be recirculated into the TMF or mill flow stream in extreme circumstances. Sediment that accumulates in the Process Pond will be removed periodically to maintain the design capacity.

 

15.8.2.1Diversions and Collection Channels

 

The steep mountainous terrain and compact development footprint will require additional geotechnical and geochemical studies to confirm soil and bedrock depths along the proposed conveyance alignments and acid rock drainage/metal leaching potential. Bedrock is expected to be relatively shallow creating challenges for construction, however shallow bedrock may increase the collection efficiency of surface and shallow sub-surface water interception. In addition, construction of channels within bedrock may eliminate the need for riprap protection while reducing potential seepage through soils in the channel bottom.

  
Arctic ProjectPage 295
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Diversion channels will be constructed around the perimeter of the TMF and WRF, above the overburden stockpiles, and above the mill site infrastructure area. The channels will convey non-contact water runoff to Subarctic Creek. Runoff from haul roads is anticipated to be managed within the road footprint via roadside ditches with runoff reporting to the WRCP. The main purpose of the diversion channels is to reduce the amount runoff contacting mined materials. The diversion of non-contact water will reduce water treatment costs, and storage volume requirements. Channel construction will be phased during the construction period, and prior to commencement of mining to maximize non-contact water diversion.

 

Non-contact and contact water diversions are designed to convey the peak flow from a 100-year 24-hour rain-on-snow event. All channels will have a minimum depth and width of 1.0 m with lining either consisting of bedrock or riprap to provide erosion protection. Riprap will be sized to provide a stable non-erodible conveyance route, with riprap of reasonable size sourced locally on-site (max median particle size, D50 ≤ 300-450 mm). The riprap thickness is specified at two times the D50 and will be placed on geotextile fabric to limit erosion below the armour and reduce sediment loading downstream. Channel depths will include a minimum freeboard of 0.3 m above the design peak flow depth to accommodate potential ice or sediment accumulation, unforeseen climatic events, or other uncertainties.

 

A 4-m wide access road will be located adjacent to each of the channels to provide access during construction and then for maintenance and cleaning of ice and sediment accumulation during operations and closure.

 

Localized seeps are anticipated to be encountered along the alignments during construction. A thorough survey prior to development of engineered design is required to identify areas of potential seep locations and accommodate mitigation measures as needed. Seepage collection and management may require widening of channels in the immediate area to allow for ice build-up during the late fall as conditions change from flowing to frozen water, or to intercept and manage subsurface flowing water within talus slopes. Maintenance of these seeps during the winter could prove challenging during freeze-up and prior to freshet. Prior to freshet flows, channel maintenance will be critical to ensure that adequate freeboard is available, and run-off is contained within the channels.

 

15.8.2.2Culverts

 

Culverts will be required to manage contact water intercepted on the haul roads, and to pass diverted non-contact water through access and haul road corridors. The haul road corridors will traverse the hillside above the WRCP, between the pit and the WRF. The switch-backing layout of the haul roads will present a challenge to manage contact water for each of the small catchment areas, which will change throughout the project life. However, the location of the WRCP immediately down slope of the haul road corridor will allow for contact water to be collected in roadside channels and discharge downslope towards the WRCP for collection. The location and sizing of the culverts along the haul road should be incorporated into the haul road design. A small allowance has been included in the capital expenditures for culvert construction.

 

A major pipe structure (the eastern diversion pipe) will be located above the haul road corridors on the eastern edge of the Arctic Project. This pipe will collect and convey non-contact water collected upslope of diversion channels DV-4 and DV-5 and discharge into Subarctic creek via DV-6 through the Process Pond spillway. Concrete inlet or drop structures will be constructed at the terminus of the channels connecting to the diversion pipe.

 

A temporary diversion channel and pipe (upper reaches of DV-1) will be constructed during the pre-operations period on the western boundary of the WRF. The temporary diversion channel will terminate in an excavated sump, pre-cast manhole or constructed concrete manhole. A pipe will be installed in the sump/manhole conveying water immediately downslope into a receiving channel. The temporary diversion channel pipe, and sump will be buried at the end of the pre-operations period. The temporary channel will be breached periodically at the boundary of the WRF to prevent contact water entering the non-contact water system downstream.

  
Arctic ProjectPage 296
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

All pipe structures are designed to accommodate the 100 year, 24-hour rain-on-snow event. The culverts will be trenched in and backfilled with engineered fill. Diversion pipes located on hillsides will be stabilized by burial or mounding of soils sourced in the immediate area, trenching and backfill, or placed on a prepared bed and secured with concrete thrust block anchors if bedrock depths prevent conventional trenching or burial anchors. All pipes will discharge onto a stabilized rip-rap apron to reduce erosion potential.

 

15.8.2.3Collections Ponds

 

Contact and high sediment water will be routed to the WRCP. Water collected in the WRCP will be pumped to the WTP or TMF for use as mill make-up water. Water collected in the Process Pond will be used as make-up water to the mill.

 

15.8.3Waste Rock Collection Pond

 

The WRCP will be located directly below the toe of the WRF. The pond will collect seepage from the WRF, runoff from the WRF and haul road corridor area, runoff from the ore stockpile on the ROM pad, and water pumped from the pit. The pond is sized to store the 100-year, 24-hour rain-on-snow storm volume plus two days of average snow melt runoff and operational volume. The pond capacity will be approximately 700,000 m³ to the spillway invert of 640.5 masl with a crest height of 642 masl.

 

Water from the WRCP will be pumped to the TMF for reuse as process water or to the treatment plant to be treated and discharged to Sub-Arctic Creek. The WTP operates from May to December during operations but may be operated year-round if needed during extreme water years.

 

The dam will be constructed using overburden and bedrock material from the WRCP footprint or a suitable borrow source. Excess overburden will be stockpiled for use during closure activities.

 

Overburden material below the footprint of the dam will be removed and backfilled with well drained soils (as needed) to provide foundation stability. The excavation limit and dam foundation design requires additional geotechnical investigation. The design presented assumes all material upstream of the embankment centreline will be excavated to bedrock and material downstream excavated to suitable soils. The embankment will be constructed in 300 mm lifts, or as determined by the engineer. The downstream face of the dam will be constructed to 3H:1V while the upstream face will be 2.5H:1V. The upstream face of the pond will be lined with a geomembrane liner connected to a concrete plinth (curb) and grouted curtain wall to maximize interception of surface water and shallow groundwater.

 

A concrete-lined spillway will be constructed to manage flows up to the potential maximum flood (PMF) event. The spillway will include an intake weir and collection throat prior to discharging in the spillway. A stilling basin will be located at the outfall of the spillway, to reduce flows to non-erosive velocities. The spillway length could be reduced by using one of various methods of energy dissipation within the channel; however, energy reduction in the channel generally requires additional depth of flow, resulting in larger concrete requirements. The construction cost would likely be similar. A riprap-lined spillway was investigated; however, steep terrain, lack of geotechnical information, and the channel configuration would likely result in a large costly excavation that could encroach on the haul road located up-slope of the WRCP.

 

Figure 15-7, Figure 15-8, and Figure 15-9 illustrate the proposed design of the WRCP and process water pond.

  
Arctic ProjectPage 297
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Figure 15-7: WRCP and Process Pond Plan

 

 

Source: SRK, 2022.

  
Arctic ProjectPage 298
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Figure 15-8: WRCP and Process Pond

 

 

Source: SRK, 2022.

 

Figure 15-9: WRCP and Process Pond

 

 

Source: SRK, 2022.

  
Arctic ProjectPage 299
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

15.8.4Process Pond

 

The Process Pond will be located directly below the process plant. The pond will retain water from the tailings thickener overflow for a minimum of 10 days. The pond capacity will be approximately 300,000 m³ to the spillway invert of 584 masl with a crest height of 586 masl.

 

The dam will be constructed using the overburden and bedrock material stripped from within the Process Pond footprint or a suitable borrow source. Excess overburden will be stockpiled for use during closure activities.

 

Overburden material below the footprint of the dam will be removed and backfilled with well drained soils (as needed) to provide foundation stability. The excavation limit and dam foundation design requires additional geotechnical investigation. The design presented assumes all material upstream of the embankment centerline will be excavated to bedrock and material downstream excavated to suitable soils. The embankment will be constructed in 300 mm lifts, or as determined by the engineer. The down-stream face of the dam will be constructed to 3H:1V while the upstream face will be 2.5H:1V. The pond will be lined to crest level with 80-mil primary and 60-mil secondary LLDPE geomembrane liners. A geonet or similar drainage layer will be installed above the secondary liner to convey any leak through the primary liner to a leak collection and recovery sump (LCRS). An underdrain will be constructed beneath the process pond to convey any shallow groundwater below the pond and prevent liner uplift.

 

A concrete-lined spillway will be constructed to manage flows up to the potential maximum flood (PMF) event. The spillway will include an intake weir and collection throat prior to discharging in the spillway. A stilling basin will be located at the outfall of the spillway, to reduce flows to non-erosive velocities. The spillway length could be reduced by using one of various methods of energy dissipation within the channel; however, energy reduction in the channel generally requires additional depth of flow, resulting in larger concrete requirements. The construction cost would likely be similar. A riprap-lined spillway was investigated; however, steep terrain, lack of geotechnical information, and the channel configuration would likely result in a large costly excavation that could encroach on the haul road located up-slope of the WRCP.

 

15.8.5Groundwater Management System

 

Results from the preliminary water and load balance model suggest that small amounts of groundwater could bypass the WRCP, and a cut-off wall may need to be constructed to prevent degradation of water quality in Subarctic Creek. A groundwater interception system was designed downgradient of the WRCP. This system would include:

 

•Shallow collector trench across the Sub-Arctic valley bottom for overburden water.

 

•Small diameter collector pumping wells completed in bedrock for deep water bypass.

 

•Downgradient performance monitoring wells with completions in overburden, weathered bedrock and competent bedrock.

 

A second system located downgradient of all site water management infrastructure was included as a contingency for the closure period, when the open pit contains water and leakage from mine components could bypass the primary system. This system includes small diameter collector pumping wells completed in bedrock, and downgradient performance monitoring wells.

 

Groundwater management system operation would be guided under an adaptive management plan or trigger action response plan.

  
Arctic ProjectPage 300
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

15.8.6Site Water and Load Balance

 

The water balance model is based on the current water management plan and was used to predict water use, surpluses, and deficits for the site and mine water management infrastructure (TMF reclaim pond, Process Pond, and WRCP) over the 13-year mine life through to closure and post-closure. Mine facility footprints vary according to the mine plan over the LOM. The model evaluated the following hydrological conditions:

 

•Average hydrological conditions with mean annual precipitation of 1,219 mm/a over the LOM.

 

•Consecutive 1-in-25 year wet years with annual precipitation of 1,816 mm/a in years 12 and 13.

 

•Consecutive 1-in-25 year dry years with annual precipitation of 743 mm/a in years 12 and 13.

 

The load balance integrated source terms with the water balance. Source terms define the water chemistry of each water type. For potentially acid generating materials in the WRF and pit, two source terms were developed:

 

•Operations source terms prior to onset of acid generation.

 

•Closure source terms post-onset of acid generation.

 

PAG waste rock was assumed to generate acid at closure. This change in source terms increased the mass leaching from the WRF and pit during closure.

 

New and existing source terms will need to be updated to incorporate the revised water management plan and updated hydrology assessment. Loading from sources requiring updates are estimated to contribute less than 20% of the total load to the WTP for constituents of concern during operations and Phase 1 of closure but may account for up to 25% to 60% of the total load to the WTP in Phase 2 of closure. This indicates the model may underpredict WTP influent concentrations in Phase 2 of closure. Subsequent revisions of the model will incorporate updated source terms.

 

Constituent mass loads and flows were mixed to estimate concentrations at various locations on the site and in the receiving environment. Contact water will be treated to the Alaskan Water Quality Standards (WQS; 18 AAC 70), as described in Alaska Water Quality Criteria Manual for Toxic and Other Deleterious Organic and Inorganic Substances (ADEC 2008) prior to being discharged to Subarctic Creek.

 

The results from the water and load balance indicate that during operations, excess water from the WRCP will need to be treated prior to discharge to the receiving environment. During closure, the WRCP and water from dewatering of the TMF will be pumped to the pit and will also need to be treated for selenium and other constituents prior to discharge to the receiving environment (see description in Section 17.3).

 

15.9Water Treatment Plant

 

The results from the water and load balance were used to develop a water treatment strategy. The treatment processes were defined based on the approximately 25 parameters predicted in the load balance to be present in WTP influent at peak concentrations above their WQS in the Subarctic Creek or the Shungnak River, including pollutants with a range of treatment mechanisms—cationic metals (such as cadmium and copper), anions (sulphate, fluoride), forms of nitrogen (ammonia, cyanide, and nitrate), selenium, other oxyanions (such as arsenic), and temperature.

  
Arctic ProjectPage 301
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

Key aspects of the selected water management overall approach include:

 

•Assume the site will be assigned water quality-based effluent limits matching the state’s WQS for the nearby Creek or River. Therefore, design the WTP to treat to all parameters to the WQS applicable to Subarctic Creek, so that site is not reliant on receiving a permit allowing a mixing zone for compliance.

 

•Provide a single WTP, built in stages.

 

oThe WTP will initially consist of a chemical/physical plant with reverse osmosis (RO). In the Operations phase, when the TMF is in use, the RO reject will be sent to the TMF, and only RO permeate will be discharged to the Creek. The plant will include:

 

■Chemical treatment: Includes addition of caustic, soda ash, ferric chloride, and polymer into mixed reactor tanks. Solids formed are then settled out and removed in a clarifier. This step removes a significant portion of cationic metals such as cadmium and zinc. Liquid chemicals will be stored in tanks; soda ash will be stored in silos.

 

■Ultrafilter: Protects the RO system by removing suspended solids carrying over from the chemical treatment system.

 

■RO: Concentrates contaminants into the RO reject stream. Permeate water quality will be within WQS.

 

■Reconstitution: RO permeate is reconstituted prior to discharge to Subarctic Creek. A calcite contactor tank dissolves carbonate into the discharge water to maintain alkalinity greater than 20 mg/L as calcium carbonate. Caustic and hydrochloric acid are provided as needed for pH adjustment.

 

oWhen the TMF is closed at the end of the Operations phase, a biological/chemical/physical plant will be added to treat the RO reject. This phased approach provides multiple benefits, including allowing time to gain insight on the site’s true wastewater flow and quality so that the RO reject treatment design can be improved upon. This treatment train will include:

 

■Gypsum clarifier: Reduces sulphate concentration in the reject treatment stream train to the gypsum saturation limit by adding lime stored in silos. The system will also remove cationic metals such as cadmium and zinc.

 

■Anaerobic biological treatment: Biochemically reduces nitrate to nitrogen gas and selenate and selenite to elemental selenium (a solid). Selenium and metal solids removed in the sludge are settled out and removed by the biological ballasted clarifier.

 

■Aerobic biological treatment: Polishes residual organics added in the upstream anaerobic biological treatment. Solids are separated via a membrane filter with iron coprecipitation for polishing selenium.

 

oDuring the Closure phase, the WTP will either be run year-round or for partial year based on water storage requirements. During the Operations phase, mill water demands will affect site water flows such that the WTP can be shut down and the discharge eliminated during roughly half of the year (winter).

 

oDuring Operations, sludge from the WTP will be disposed of at the TMF. During Closure, sludge from the WTP will be disposed in filter bags on a lined area which will decant solution back to the pit.

 

•This WTP will operate in perpetuity.

  
Arctic ProjectPage 302
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

  

15.10Tailings Management Facility

 

15.10.1General Description

 

The TMF will be located at the headwaters of Subarctic Creek, in the upper-most portion of the creek valley (refer to Figure 15-6). The maximum storage capacity of the facility will be about 40.7 Mm³ (tailings and process water) at an elevation of 889.5 m plus an additional 2.5 m of freeboard. The 59 ha footprint of the TMF will be fully lined with a geomembrane liner.

 

Tailings containment will be provided by an engineered dam, buttressed by the WRF constructed immediately downstream of the TMF, and the natural topography on the valley sides. A starter dam will be constructed to elevation 805 m two years prior to mine start up and then increased to 830 m by the end of the construction period. Three subsequent raises will bring the final dam crest elevation to 892 m, which is 98 m lower than the final elevation of the WRF. The expected maximum tailings production rate is 8,900 t/d and the TMF is designed to store approximately 37.4 Mm3 (41.2 Mt) of tailings over the 13-year mine life, 3.3 Mm3 of additional pond water, as well as 1.5 times the probable maximum flood (PMF). Instruments installed in the tailings dam are anticipated to include piezometers, settlement monuments, and shape arrays.

 

Tailings will be deposited as thickened slurry from the dam crest by multiple spigots. In the winter, other deposition methods, such as subaqueous deposition and/or single point discharge, may be needed to minimize ice entrainment in the tailings. At the time of this report, detailed laboratory analysis of thickened tailings is underway. For this report, a dry density of 1.1 t/m3 was used to estimate the storage capacity of the facility. The final consolidated tailings dry density is assumed to be 1.25 t/m3 based on simple 2 D consolidation calculations (SRK 2020). To further reduce the duration of tailings consolidation, a drainage system should be evaluated, that would be installed above the TMF liner, convey seepage from the tailings to a sump at the upstream toe of the TMF dam, and then pump the seepage into the reclaim water system.

 

15.10.2Design Criteria

 

The basis of the TMF design is provided in Table 15-3. Values were determined from project-specific information, judgment, and experience with other projects.

 

The TMF design was performed in accordance with the following guidelines, standards, and regulations:

 

•Guidelines for Cooperation with the Alaska Dam Safety Program, July 2017.

 

•Alaska Administrative Code Title 11, Chapter 93, Article 3 Dam Safety.

 

•State of Alaska Mining Laws and Regulations, Alaska Department of Natural Resources Division of Land and Water, 2014.

 

•Canadian Dam Association, 2019. Technical Bulletin: Application of Dam Safety Guidelines to Mining Dams.

 

•Global Industry Standard on Tailings Management (GISTM), 2020.

  
Arctic ProjectPage 303
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Table 15-3: TMF Design Parameters and Design Criteria

 

Design Item Criteria Reference
Operational life of TMF 13 years Wood
Total tailings 41.2 Mt Wood
Annual tailings production (solids) 3 Mm3/a Wood
Tailings percent solids (in the slurry pipeline) 47% (Ms/(Ms+Mw)) Ausenco
Tailings solids specific gravity 3.0 SRK
Tailings settled dry density 1.1 t/m3 SRK
Expected tailings deposition angles* 1.0 % SRK (2020)
Tailings deposition Spigots from dam crest (summer) SRK
Target tailings storage requirement 37.4 Mm3 SRK
Dam hazard classification Class I ADSP (2017)
Minimum freeboard above tailings 2.5 m SRK
Tailings dam crest width 30 m SRK
Tailings dam max elevation (height) 892 masl (192 m) SRK
Design earthquake return period and ground motion 1:10,000 year, PGA = 0.374 ADSP (2017), GISTM (2020)
Stability Factors of Safety (FOS) (minimum) 1.0 (pseudostatic) to 1.5 (static) CDA (2019)
Maximum allowable seismic displacement 0.5 m SRK
Dam construction materials Waste rock compacted in 1 m lifts SRK
Dam downstream and upstream slopes 2.5H:1V (maximum) SRK
Starter dam storage capacity (elevation) 1.5 Mm3, Year -1, (805 masl) SRK
End of construction capacity (elevation) 6.5 Mm3, Year 0, (830 masl) SRK
Dam Raise 1 storage capacity (elevation) 13.9 Mm3, Year 1, (850 masl) SRK
Dam Raise 2 storage capacity (elevation) 24.8 Mm3, Year 4, (870 masl) SRK
Dam Raise 3 storage capacity (elevation) 40.7 Mm3, Year 7, (892 masl) SRK
Storm inflow design flood without overtopping 1.5 x Probable Maximum Flood (PMF) SRK, ADSP (2017), GISTM (2020)

 

Notes: *Values from 2020 Trilogy Feasibility Study, based on whole slurry tailings.

 

The design criteria were based on site conditions as of August 2019, on assumptions interpreted from review of available information, and on pre-feasibility-level field investigations and associated reporting. Where data were not available, pre-feasibility-level assumptions were made.

 

15.10.3Overburden Geotechnical Investigation

 

An overburden geotechnical investigation was carried out in 2017 (SRK, 2017) and 2018 (SRK, 2018) to provide overburden characterization in support of waste facility siting evaluation and geotechnical design of the WRF and TMF.

  
Arctic ProjectPage 304
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Surficial deposits mapped in the project area include glacial, aeolian, and fluvial deposits, with colluvium-covered slopes. Most morainal deposits at the site are from the late Pleistocene Walker Lake glaciation, and consist of drift deposits characterized by boulders, cobbles, and gravels in a fine-grained matrix, as well as outwash deposits of silty sand. The Subarctic Creek valley mainly consists of well-graded silty sand and gravel colluvium and alluvium, with some zones of large cobbles and boulders. Overburden thickness within the Subarctic Creek valley generally increases down-valley towards the Shungnak River valley.

 

In the proposed TMF and starter dam footprints, groundwater was encountered during drilling and test pitting at depths between 0.2 and 4.9 m. Groundwater was encountered at depths between 6 and 21 m below ground in the bedrock around the perimeter of the TMF. Based on groundwater elevation records in these areas, the planned facilities will be located in groundwater recharge zones.

 

In the planned WRF footprint, groundwater was encountered during drilling and test pitting at depths between 0.8 m and 13.5 m. Groundwater levels are generally near the surface on the western and central parts of the footprint and deeper on the eastern side of the footprint. Drill holes on both sides of the valley appear to be located in groundwater recharge zones. The center of the valley may correspond to both recharge and discharge zones.

 

The groundwater depth within the footprint of each planned infrastructure within the Subarctic Creek valley is relatively shallow. The average groundwater depth is 1.5 m and seems to correspond to the weathered bedrock–overburden contact. The water depth seems to be relatively constant despite varying surface slope angles.

 

15.10.4Site Selection

 

The TMF site was selected in August 2017 during a workshop (Ausenco 2017) to evaluate locations for the TMF and WRF.

 

A weighting system was applied to four broad categories including environmental concerns, permitting, capital costs, and operating costs.

 

The site was reviewed again in 2021 during a tailings alternative review and found to be the preferred alternative. This work included a thorough review of the GISTM (2020) and the review found the proposed design to be compliant with GISTM.

 

15.10.5Starter Dam

 

Overburden in the TMF starter dam area is characterized as thin well-graded silty sand with gravel or silty gravel with sand (SM or GM). The contact with the underlying fractured weathered bedrock occurs at depths varying between 0.2 and 3.1 m in the TMF and between 1.0 and 9.1 m in the starter dam area. The thicker overburden occurs in the center of the valley, south of the toe of the starter dam. The overburden is interpreted to be colluvial in origin. Bedrock crops out at the north end of the TMF.

 

The overburden will be excavated underneath the footprint of the starter dam and removed to reduce potential settlement and deformation of the TMF dam; overburden removal will therefore reduce the potential for underperformance of the liner that will be installed on the dam’s upstream face.

 

The topsoil and overburden material will be stockpiled below the pit and WRF, respectively, for use in future reclamation of the waste facilities.

  
Arctic ProjectPage 305
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

The starter dam will be constructed in two phases to an ultimate lined elevation of 830 m, which will allow for storage of the pre-production water and approximately one year of storage (~1.6 Mm3) to supply the mill during start-up. The upstream and downstream faces of the starter dam will be constructed at 2.5H:1V and constructed entirely of waste rock from the open pit. Waste rock will be placed in 1 m lifts and compacted by the mine fleet haul trucks. Figure 15-10 shows a cross section through the complete TMF and WRF, illustrating the starter dam in relation to the final dam and the downstream WRF.

 

The TMF footprint and the upstream face of the dam will be lined with a textured geomembrane, placed over geotextile on prepared subgrade. To prepare for liner installation, the TMF area will be cleared, grubbed, and stripped of topsoil prior to grading and placement of the geotextile. The face of the dam will be covered with bedding material to protect the liner against puncture from potential sharp edges in the waste rock.

  
Arctic ProjectPage 306
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Figure 15-10: Cross Section of the TMF & WRF showing Starter Dam to Elevation 805 m

 

 

Source: SRK, 2022.

 

Figure 15-11: Cross Section of the TMF and Raises to Final Design Evaluation

 

 

Source: SRK, 2022.

  
Arctic ProjectPage 307
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

15.10.6Dam Raises and Final Dam

 

Three dam raises will be completed to reach the final dam height of 892 m. The construction for these raises will be completed in Years 1, 4, and 7 to elevations 850 m, 870 m and 892 m respectively. Construction will be completed using the downstream method and will connect the structural fill in the tailings dam with the uncompacted WRF. Tailings deposition will be required from the perimeter of the TMF during the construction sequence of the dam crest. The dam crest will be constructed to a width of 30 m at the end of each construction campaign.

 

An upstream slope of 2.5H:1V will be maintained throughout the construction of the dam to facilitate the placement of the bedding layer and the installation of the liner. The downstream portion of the dam will about the WRF at each stage of dam raising. Construction material for the dam will be waste rock compacted in 1 m lifts.

 

Additional liner will be placed within the expanded TMF footprint using the same procedures as for the initial starter dam. The TMF area will be cleared, grubbed, and stripped, and bedding material and geotextile placed prior to the geomembrane being laid down and seamed to the existing liner.

 

Figure 15-11 shows a cross section of the complete TMF and the raises constructed to reach the final design elevation.

 

15.10.7TMF Water Pool and Water Return

 

Under normal situations, the pool will be maintained deeper towards the north portion of the TMF away from the deposition spigots. Recycle water will be obtained using a floating barge and pipeline system situated on the pool.

 

Tailings deposition in winter will be managed to limit ice formation in the tailings, for example, by subaqueous deposition and/or single point discharge of the tailings.

 

Thickened tailings may necessitate modification of pond and deposition management.

 

15.10.8Tailings Delivery and Return Systems

 

The tailings delivery system will transport slurried tailings from the processing plant to the TMF. This will consist of one three-kilometre pipeline, with two kilometres of this being 500 mm (20 inch) diameter carbon steel rubber lined pipeline and the remaining one kilometre being 600 mm (24 inch) HDPE. This pipeline will transport up to 1,843 m3/h of tailings to the TMF.

 

The return water delivery system for recycle water from the TMF has been sized on the basis of 1,308 m3/h of water being pumped from the TMF to the process water pond. This system will consist of a barge pump and a 3 km-long pipeline, run adjacent to the tailings pipeline. The pipeline will consist of 2 kms of 450 mm (18 inch) diameter carbon steel pipeline, with the remaining 1 km being 500 mm (20 inch) HDPE.

 

Both pipelines will be heat-traced to prevent freezing.

 

15.11Waste Rock Facility and Overburden Stockpiles

 

The WRF will be developed north of the planned Arctic pit in the upper part of the Subarctic valley. The waste rock placed in the northernmost portion of the WRF will be compacted to provide structural fill for the TMF.

  
Arctic ProjectPage 308
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

There will also be three stockpiles to store the stripped topsoil and overburden from the TMF footprint.

 

15.11.1Waste Rock Facility

 

The overburden in the WRF area is characterized as well-graded silty sand with gravel or silty gravel with sand (SM or GM) and angular cobbles interpreted to be colluvial in origin. Overburden is slightly thicker on the west side of the valley (± 10 m) than on the east side of the valley (± 6 m), and ranges between 3.0 and 5.6 m in the centre of the valley. Based on exposed bedrock, overburden is inferred to thin on the valley sides.

 

The total volume of waste rock is expected to be 162.6 m3 (340 Mt); however, there is potential for expanded volume in the waste if placement density is < 2.0 t/m³. Most of the waste rock is anticipated to be PAG and there will be no separation of waste based on acid generation potential. Rather, seepage from the WRF will be collected and treated. An underdrain at the base of the WRF will be built to collect and manage the seepage.

 

The WRF is planned to be constructed in 5 m lifts with benches set back at 23.5 m after every fourth lift, to achieve an overall slope of 2.5H:1V. The final design is expected to have variations in the slope aspect, to best manage overland flow, resulting in a transitioning convex to concave shape of the WRF face.

 

The maximum stacking height (above existing grade) of the WRF is planned at 340 m to an elevation of 990 masl. The effective normal stress for potential critical failure surfaces at the base could reach values up to 5,000 kPa, which is higher than the weathered bedrock’s unconfined resistance (on the order of 3,000 kPa) and significantly lower that the competent bedrock resistance (± 32,000 kPa). These values were obtained from uniaxial compressive strength (UCS) tests. Considering the potentially mobilized zone under the stress (and potential strains) imposed by the stacked material, crushing of the waste rock should be expected. A sensitivity analysis was performed to assess the effect of finer-grained, granular waste rock on WRF stability.

 

A rockfill underdrain will be constructed under the WRF in the current Subarctic Creek channel. The underdrain will be excavated into overburden prior to WRF construction and will be capable of handling base flow through the Subarctic Creek valley. Water will be collected in the WRCP at the base of the WRF and held for treatment. The underdrain system will be used to maintain the phreatic water level as low as practicable within the WRF to increase the stability of the facility.

 

15.11.2Overburden and Topsoil Stockpiles

 

Three stockpiles will be developed to store topsoil and overburden materials for use in final site reclamation. The topsoil stockpile will be placed in between the haul roads west of the planned pit and will store up to 325,000 m³. The overburden stockpiles will be located south of the WRF and will store up to 2,200,000 m³. The overburden stockpile geometries may be modified to act as or integrate with avalanche deflection berms.

 

15.12Compressed Air Supply

 

High-pressure compressed air will be provided by three duty and one standby screw compressors and a duty plant air receiver. The instrument air will be dried and then stored in a dedicated air receiver. The plant air will be fed directly from the plant air receiver.

 

High-pressure air for the concentrate filters will come from a dedicated system of two duty and one standby screw compressors and a concentrate filtration area air receiver.

  
Arctic ProjectPage 309
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

Low-pressure air for flotation-cell air requirements will be provided by four duty and one standby centrifugal blower.

 

15.13Site Communications

 

External communications, including voice and data, will use a satellite connection with a line-of-sight to an orbiting geostationary satellite. Earth stations are expected to be located at the process plant area, camp area, contractor laydown yard proposed to be located at the road junction between the planned mine access road and the proposed AAP road, and the Dahl Creek airport. There will be separate systems for business operations and personal use.

 

Radio communications around the operation will be a very high frequency (VHF) Hi-Band system with radios in all mobile equipment and operations offices. There will be multiple frequencies with a frequency assigned to a specific operational group. The Dahl Creek airport will have a UHF radio to communicate with in-bound aircraft.

 

It is expected that there will be cell phone access for personal use in a limited area. This system will be installed and maintained by a communications service provider.

 

Communications for truck operators on the AAP road will be with VHF radios utilizing a system that will be installed as part of the AAP road.

 

15.14Fire Protection

 

The firewater distribution network will be maintained under a constant pressure with a jockey pump and will be looped and sectionalized to minimize loss of fire protection during maintenance. Where run outside buildings, fire water piping will be above ground and be heat traced and insulated.

 

Yard hydrants will be limited to the fuel storage tank area. Wall hydrants will be used in lieu of yard hydrants, and these will be located on the outside walls of the buildings in heated cabinets.

 

Fire protection within buildings will include standpipe systems, sprinkler systems and portable fire extinguishers. Standpipe systems will be provided in structures that exceed 14m in height and additionally where required by regulations, local authorities or the insurance underwriter.

 

Camp modules will be purchased with fire detection; fire rated walls and will use separation as a means of fire protection. Handheld extinguishers will be located throughout the buildings.

 

Fire protection of the generators will be provided by a water mist system. Gas detection will be provided to detect dangerous levels of diesel gas within the generator building.

 

15.15Plant Buildings

 

15.15.1Truck Shop and Mine Offices

 

The mine truck shop and mine offices area will be 2,400 m2 in area and will be positioned on an upper pad adjacent to the fuel storage area. This building will consist of the truck workshop, truck wash, mine offices, and mine dry. The truck workshop will have lifting and handling activities fulfilled by an overhead gantry crane. This building will be a pre-engineered steel frame and metal-clad building. The building will be heated using a system that will use waste heat produced from the diesel generators.

  
Arctic ProjectPage 310
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

15.15.2Laboratory

 

The laboratory will be 300 m2 in area and will be situated adjacent to the process building. The building will house all laboratory equipment for the daily operational process control including the metallurgical and environmental requirements. Any mechanical items associated with the dust collection equipment will be located external to the building. The building will be constructed as a single-storey modular wood-frame building. This building will be heated using an air handler system that using waste heat produced from the diesel generators.

 

15.15.3Administration Building

 

The administration building will consist of HR, accounting and senior site management. The building will have an approximate area of 850 m2. The building will be constructed as a single-storey modular wood-frame building. This building will be heated using an air handler system that will use waste heat produced from the diesel generators.

 

15.15.4Mill Dry Facility

 

The mill dry facility will consist of plant change rooms for the process plant area. The building will be approximately 400 m2 in area. These facilities will have clean and dirty areas and will be complete with showers, basins, toilets, and lockers. The building will be constructed as a single-storey modular wood-frame building. This building will be heated using an air handler system that will use waste heat produced from the diesel generators.

 

15.15.5Plant Workshop and Warehouse

 

The plant workshop will be used to perform maintenance on process equipment and equipment spares. The plant workshop will be approximately 780 m2 in area. This building will be a pre-engineered steel frame and metal-clad building. This building will be heated using an air handler system that utilizes waste heat produced from the diesel generators.

 

15.15.6Primary Crushing

 

The primary crushing area will feature a fabric structure approximately 70 m2 in area that will be located above and adjacent to the crusher dump pocket to assist with dust collection measures.

 

15.15.7Crushed Ore Stockpile

 

A geodesic dome will be used over the crushed ore stockpile to keep the ore dry during the winter. The building will be approximately 2,700 m2 in area.

 

15.15.8Process Plant

 

The process plant building will have an approximate area of 4,800 m2, and will house all of the milling, flotation and concentrate thickening equipment. The building will be divided into two sections. The first section will contain the mill and will have dimensions of 30 x 24 m; the second section will contain the flotation, regrind and thickening equipment and will be 36 x 98 m in size. Both sections will be serviced by overhead cranes.

  
Arctic ProjectPage 311
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

This building will be a pre-engineered steel frame and metal-clad building with internal insulation to reduce heat loss. This building will be heated using an air handler system that utilizes waste heat produced from the diesel generators.

 

15.15.9Concentrate Loadout

 

The concentrate loadout building will house process equipment and provide a covered area for loading the concentrate on to the trucks. This building will be separated from the process plant building to minimize the building volume that requires process ventilation equipment. The building will be approximately 1,700 m2 in area, will be a fabric structure and will not be heated to assist in drying out the concentrate prior to transport.

 

15.15.10Reagent Storage and Handling

 

The reagent storage and handling building will be located outside the process plant building. The building will have an approximate area of 680 m2. This building will be pre-engineered steel frame and metal-clad building. This building will be heated using an air handler system that will use waste heat produced from the diesel generators.

 

15.15.11Water Supply

 

The water supply building will be located at the fresh water source and house the pumping equipment. The building will be 36 m2 in area and will be a pre-engineered modular building. It will be heated using electric unit heaters.

 

15.16Concentrate Transportation

 

Concentrate will be shipped from the Arctic mine site to the Port of Alaska in Anchorage in specialized 20ft intermodal bulk shipping containers for direct loading into bulk carrier vessels for ocean transport to the smelter or refinery. Containers will be trucked to Fairbanks, and then transferred to rail for delivery to the Anchorage port terminal.

 

A concentrate trucking contractor will be responsible for loading the containers in the concentrate storage building using a wheeled loader. Containers will be loaded with net 28.1 wmt of concentrate, resulting in 31.2 t gross weight per container. Based on a daily production of 1,289 wmt of concentrates (470,586 wmt per year), approximately 46 containers will be loaded per day and shipped from the Arctic site.

 

The base for the trucking operation will be at the junction where the road to the Arctic Mine would intersect the proposed AAP road, hereafter referred to as the Arctic Mine Junction (AMJ). This would be the primary laydown yard for concentrate containers. The trucking contractor would have a maintenance facility at AMJ, and mobile maintenance trucks along the AAP; however, most major equipment maintenance work is expected to be performed at the concentrate trucking contractor’s Fairbanks operating base.

 

The trucking of the containers to Fairbanks is planned to be undertaken in three stages:

 

•Load trucking containers at the Arctic mine concentrate storage building and then transport the container to the AMJ.

  
Arctic ProjectPage 312
S-K 1300 Technical Report SummaryNovember 30, 2022
  

 

   
   

 

•The containers would be trucked from AMJ using the AAP road to the Dalton Transfer Yard (DTY) facility. The DTY would be located near the intersection of the AAP road with the Dalton Highway and would be operated by the concentrate trucking contractor. A Super B-train configuration will be used on the AAP road, with each truck hauling two containers. At DTY, each truck will offload the two containers and return to the mine with two empty containers. This will require approximately 23 trips per day. Drivers would be based at either the Arctic site or AAP road and will complete one return trip per day from AMJ to DTY.

 

•The concentrate trucking contractor would use a Fairbanks-based fleet to move the containers using a single trailer configuration from the DTY to a depot in Fairbanks. When the trucks undertake the trip from Fairbanks to DTY, each truck would transport one empty container.

 

In Fairbanks, the containers would be loaded on railcars for transport to the Port of Alaska. At the port, the containers would be stag