Schedule III-Real Estate And Accumulated Depreciation (Detail) - USD ($)
$ in Thousands
12 Months Ended
Dec. 31, 2016
Dec. 31, 2015
Dec. 31, 2014
Dec. 31, 2013
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances $ 944,003      
Initial Costs, Land & Land Improvements 240,171      
Initial Costs, Building and Building Improvements 2,235,690      
Costs Capitalized Subsequent to Acquisition, Land & Improvements 5,392      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements 121,099      
Costs Capitalized Subsequent to Acquisition, Construction in Process 89,722      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1] 245,563      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1] 2,356,789      
Gross Amounts at which Carried at Close of period, Construction in Process [1] 89,722      
Total 2,692,074 [1] $ 2,588,903 $ 1,721,429 $ 859,877
Accumulated Depreciation (153,124) $ (90,201) $ (40,467) $ (11,011)
Primrose Retirement Community Casper, Wyoming        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] 11,789      
Initial Costs, Land & Land Improvements [2] 1,910      
Initial Costs, Building and Building Improvements [2] 16,310      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 296      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 1,910      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 16,606      
Total [1],[2] 18,516      
Accumulated Depreciation [2] $ (2,099)      
Date of construction [2] 2004      
Date Acquired [2] Feb. 16, 2012      
Primrose Retirement Community Of Grand Island        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 8,316      
Initial Costs, Land & Land Improvements [2] 719      
Initial Costs, Building and Building Improvements [2] 12,140      
Costs Capitalized Subsequent to Acquisition, Land & Improvements [2] 25      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 744      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 12,140      
Total [1],[2] 12,884      
Accumulated Depreciation [2] $ (1,620)      
Date of construction [2] 2005      
Date Acquired [2] Feb. 16, 2012      
Primrose Retirement Community Mansfield, Ohio        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 11,315      
Initial Costs, Land & Land Improvements [2] 650      
Initial Costs, Building and Building Improvements [2] 16,720      
Costs Capitalized Subsequent to Acquisition, Land & Improvements [2] 229      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 71      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 879      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 16,791      
Total [1],[2] 17,670      
Accumulated Depreciation [2] $ (2,231)      
Date of construction [2] 2007      
Date Acquired [2] Feb. 16, 2012      
Primrose Retirement Community Marion, Ohio        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 9,385      
Initial Costs, Land & Land Improvements [2] 889      
Initial Costs, Building and Building Improvements [2] 16,305      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 889      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 16,305      
Total [1],[2] 17,194      
Accumulated Depreciation [2] $ (2,150)      
Date of construction [2] 2006      
Date Acquired [2] Feb. 16, 2012      
Sweetwater Retirement Community Billings Montana        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 10,193      
Initial Costs, Land & Land Improvements [2] 1,578      
Initial Costs, Building and Building Improvements [2] 14,205      
Costs Capitalized Subsequent to Acquisition, Land & Improvements [2] 19      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 1,597      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 14,205      
Total [1],[2] 15,802      
Accumulated Depreciation [2] $ (1,827)      
Date of construction [2] 2006      
Date Acquired [2] Feb. 16, 2012      
HarborChase Community Lady Lake, Florida        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 2,165      
Costs Capitalized Subsequent to Acquisition, Land & Improvements [2] 986      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 15,424      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 3,151      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 15,424      
Total [1],[2] 18,575      
Accumulated Depreciation [2] $ (1,264)      
Date of construction [2] 2013      
Date Acquired [2] Aug. 29, 2012      
Primrose Retirement Community Aberdeen, South Dakota        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 311      
Initial Costs, Building and Building Improvements [2] 3,794      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 311      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 3,794      
Total [1],[2] 4,105      
Accumulated Depreciation [2] $ (421)      
Date of construction [2] 2005      
Date Acquired [2] Dec. 19, 2012      
Primrose Retirement Community Council Bluffs, Iowa        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 1,144      
Initial Costs, Building and Building Improvements [2] 11,117      
Costs Capitalized Subsequent to Acquisition, Land & Improvements [2] 5      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 1,149      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 11,117      
Total [1],[2] 12,266      
Accumulated Depreciation [2] $ (1,268)      
Date of construction [2] 2008      
Date Acquired [2] Dec. 19, 2012      
Primrose Retirement Community Decatur, Illinois        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 10,344      
Initial Costs, Land & Land Improvements [2] 513      
Initial Costs, Building and Building Improvements [2] 16,706      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 154      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 513      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 16,860      
Total [1],[2] 17,373      
Accumulated Depreciation [2] $ (1,824)      
Date of construction [2] 2009      
Date Acquired [2] Dec. 19, 2012      
Primrose Retirement Community Lima, Ohio        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 944      
Initial Costs, Building and Building Improvements [2] 17,115      
Costs Capitalized Subsequent to Acquisition, Land & Improvements [2] 8      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 4      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 952      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 17,119      
Total [1],[2] 18,071      
Accumulated Depreciation [2] $ (1,864)      
Date of construction [2] 2006      
Date Acquired [2] Dec. 19, 2012      
Primrose Retirement Community Zanesville, Ohio        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 11,674      
Initial Costs, Land & Land Improvements [2] 1,184      
Initial Costs, Building and Building Improvements [2] 17,292      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 67      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 1,184      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 17,359      
Total [1],[2] 18,543      
Accumulated Depreciation [2] $ (1,887)      
Date of construction [2] 2008      
Date Acquired [2] Dec. 19, 2012      
Capital Health of Symphony Manor Baltimore, Maryland        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 11,683      
Initial Costs, Land & Land Improvements [2] 2,319      
Initial Costs, Building and Building Improvements [2] 19,444      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 78      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 2,319      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 19,522      
Total [1],[2] 21,841      
Accumulated Depreciation [2] $ (2,089)      
Date of construction [2] 2011      
Date Acquired [2] Dec. 21, 2012      
Curry House Assisted Living & Memory Care Cadillac, Michigan        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 6,008      
Initial Costs, Land & Land Improvements [2] 995      
Initial Costs, Building and Building Improvements [2] 11,072      
Costs Capitalized Subsequent to Acquisition, Land & Improvements [2] 9      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 1,004      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 11,072      
Total [1],[2] 12,076      
Accumulated Depreciation [2] $ (1,202)      
Date of construction [2] 1966      
Date Acquired [2] Dec. 21, 2012      
Tranquillity at Fredericktowne, Maryland        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 5,779      
Initial Costs, Land & Land Improvements [2] 808      
Initial Costs, Building and Building Improvements [2] 14,291      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 32      
Costs Capitalized Subsequent to Acquisition, Construction in Process [2] 1,407      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 808      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 14,323      
Gross Amounts at which Carried at Close of period, Construction in Process [1],[2] 1,407      
Total [1],[2] 16,538      
Accumulated Depreciation [2] $ (1,534)      
Date of construction [2] 2000      
Date Acquired [2] Dec. 21, 2012      
Brookridge Heights Assisted Living and Memory Care Marquette, Michigan        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 5,925      
Initial Costs, Land & Land Improvements [2] 595      
Initial Costs, Building and Building Improvements [2] 11,339      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 11      
Costs Capitalized Subsequent to Acquisition, Construction in Process [2] 2,391      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 595      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 11,350      
Gross Amounts at which Carried at Close of period, Construction in Process [1],[2] 2,391      
Total [1],[2] 14,336      
Accumulated Depreciation [2] $ (1,213)      
Date of construction [2] 1998      
Date Acquired [2] Dec. 21, 2012      
Woodholme Gardens Assisted Living and Memory Care Pikesville, Maryland        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 7,000      
Initial Costs, Land & Land Improvements [2] 1,603      
Initial Costs, Building and Building Improvements [2] 13,472      
Costs Capitalized Subsequent to Acquisition, Land & Improvements [2] 11      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 1,614      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 13,472      
Total [1],[2] 15,086      
Accumulated Depreciation [2] $ (1,457)      
Date of construction [2] 2010      
Date Acquired [2] Dec. 21, 2012      
Batesville Healthcare Center Batesville, Arkansas        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 397      
Initial Costs, Building and Building Improvements [2] 5,382      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 397      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 5,382      
Total [1],[2] 5,779      
Accumulated Depreciation [2] $ (502)      
Date of construction [2] 1975      
Date Acquired [2] May 31, 2013      
Broadway Healthcare Center West Memphis, Arkansas        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 438      
Initial Costs, Building and Building Improvements [2] 10,560      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 77      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 438      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 10,637      
Total [1],[2] 11,075      
Accumulated Depreciation [2] $ (1,002)      
Date of construction [2] 1994      
Date Acquired [2] May 31, 2013      
Jonesboro Healthcare Center Jonesboro, Arkansas        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 527      
Initial Costs, Building and Building Improvements [2] 13,493      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 5      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 527      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 13,498      
Total [1],[2] 14,025      
Accumulated Depreciation [2] $ (1,260)      
Date of construction [2] 2012      
Date Acquired [2] May 31, 2013      
Magnolia Healthcare Center Magnolia, Arkansas        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 421      
Initial Costs, Building and Building Improvements [2] 10,454      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 421      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 10,454      
Total [1],[2] 10,875      
Accumulated Depreciation [2] $ (992)      
Date of construction [2] 2009      
Date Acquired [2] May 31, 2013      
Mine Creek Healthcare Center Nashville, Arkansas        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 135      
Initial Costs, Building and Building Improvements [2] 2,942      
Costs Capitalized Subsequent to Acquisition, Land & Improvements [2] 11      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 10      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 146      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 2,952      
Total [1],[2] 3,098      
Accumulated Depreciation [2] $ (291)      
Date of construction [2] 1978      
Date Acquired [2] May 31, 2013      
Searcy Healthcare Center Searcy, Arkansas        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 648      
Initial Costs, Building and Building Improvements [2] 6,017      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 50      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 648      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 6,067      
Total [1],[2] 6,715      
Accumulated Depreciation [2] $ (584)      
Date of construction [2] 1973      
Date Acquired [2] May 31, 2013      
LaPorte Cancer Center Westville, Indiana        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 7,797      
Initial Costs, Land & Land Improvements [2] 433      
Initial Costs, Building and Building Improvements [2] 10,846      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 433      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 10,846      
Total [1],[2] 11,279      
Accumulated Depreciation [2] $ (1,040)      
Date of construction [2] 2010      
Date Acquired [2] Jun. 14, 2013      
Jefferson Medical Commons Jefferson City, Tennessee        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 7,598      
Initial Costs, Land & Land Improvements [2] 151      
Initial Costs, Building and Building Improvements [2] 10,236      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 162      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 151      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 10,398      
Total [1],[2] 10,549      
Accumulated Depreciation [2] $ (954)      
Date of construction [2] 2001      
Date Acquired [2] Jul. 10, 2013      
Physicians Plaza A at North Knoxville Medical Center Powell, Tennessee        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 11,855      
Initial Costs, Land & Land Improvements [2] 262      
Initial Costs, Building and Building Improvements [2] 16,976      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 9      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 262      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 16,985      
Total [1],[2] 17,247      
Accumulated Depreciation [2] $ (1,585)      
Date of construction [2] 2005      
Date Acquired [2] Jul. 10, 2013      
Physicians Plaza B at North Knoxville Medical Center Powell, Tennessee        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 14,260      
Initial Costs, Land & Land Improvements [2] 303      
Initial Costs, Building and Building Improvements [2] 18,754      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 318      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 303      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 19,072      
Total [1],[2] 19,375      
Accumulated Depreciation [2] $ (1,758)      
Date of construction [2] 2008      
Date Acquired [2] Jul. 10, 2013      
Physicians Regional Medical Center - Central Wing Annex Knoxville, Tennessee        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 3,778      
Initial Costs, Land & Land Improvements [2] 73      
Initial Costs, Building and Building Improvements [2] 5,285      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 73      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 5,285      
Total [1],[2] 5,358      
Accumulated Depreciation [2] $ (491)      
Date of construction [2] 2004      
Date Acquired [2] Jul. 10, 2013      
HarborChase of Jasper Jasper, Alabama        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 355      
Initial Costs, Building and Building Improvements [2] 6,358      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 1      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 355      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 6,359      
Total [1],[2] 6,714      
Accumulated Depreciation [2] $ (577)      
Date of construction [2] 1998      
Date Acquired [2] Jul. 31, 2013      
Chestnut Commons MOB Elyria, Ohio        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 2,053      
Initial Costs, Building and Building Improvements [2] 15,650      
Costs Capitalized Subsequent to Acquisition, Land & Improvements [2] 38      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 2,091      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 15,650      
Total [1],[2] 17,741      
Accumulated Depreciation [2] $ (1,539)      
Date of construction [2] 2008      
Date Acquired [2] Aug. 16, 2013      
Doctor's Specialty Hospital Leawood, Kansas        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 924      
Initial Costs, Building and Building Improvements [2] 5,771      
Costs Capitalized Subsequent to Acquisition, Land & Improvements [2] 16      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 940      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 5,771      
Total [1],[2] 6,711      
Accumulated Depreciation [2] $ (550)      
Date of construction [2] 2001      
Date Acquired [2] Aug. 16, 2013      
Escondido Medical Arts Center Escondido, California        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 1,863      
Initial Costs, Building and Building Improvements [2] 12,199      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 23      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 1,863      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 12,222      
Total [1],[2] 14,085      
Accumulated Depreciation [2] $ (1,078)      
Date of construction [2] 1994      
Date Acquired [2] Aug. 16, 2013      
John C. Lincoln Medical Office Plaza I Phoenix, Arizona        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 233      
Initial Costs, Building and Building Improvements [2] 2,779      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 22      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 233      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 2,801      
Total [1],[2] 3,034      
Accumulated Depreciation [2] $ (286)      
Date of construction [2] 1980      
Date Acquired [2] Aug. 16, 2013      
John C. Lincoln Medical Office Plaza II Phoenix, Arizona        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 138      
Initial Costs, Building and Building Improvements [2] 1,908      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 15      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 138      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 1,923      
Total [1],[2] 2,061      
Accumulated Depreciation [2] $ (197)      
Date of construction [2] 1984      
Date Acquired [2] Aug. 16, 2013      
North Mountain Medical Plaza Phoenix, Arizona        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 297      
Initial Costs, Building and Building Improvements [2] 4,079      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 78      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 297      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 4,157      
Total [1],[2] 4,454      
Accumulated Depreciation [2] $ (415)      
Date of construction [2] 1994      
Date Acquired [2] Aug. 16, 2013      
Raider Ranch Development (Lubbock, TX)        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 4,992      
Initial Costs, Building and Building Improvements [2] 48,818      
Costs Capitalized Subsequent to Acquisition, Land & Improvements [2] 436      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 12,077      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 5,428      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 60,895      
Total [1],[2] 66,323      
Accumulated Depreciation [2] $ (4,628)      
Date of construction [2] 2009      
Date Acquired [2] Aug. 29, 2013      
Town Village Oklahoma City, Oklahoma        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 1,020      
Initial Costs, Building and Building Improvements [2] 19,847      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 1,356      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 1,020      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 21,203      
Total [1],[2] 22,223      
Accumulated Depreciation [2] $ (1,738)      
Date of construction [2] 2004      
Date Acquired [2] Aug. 29, 2013      
Calvert Medical Arts Center Prince Frederick, Maryland        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 12,233      
Initial Costs, Land & Land Improvements [2] 20      
Initial Costs, Building and Building Improvements [2] 17,838      
Costs Capitalized Subsequent to Acquisition, Land & Improvements [2] 1      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 86      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 21      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 17,924      
Total [1],[2] 17,945      
Accumulated Depreciation [2] $ (1,541)      
Date of construction [2] 2009      
Date Acquired [2] Aug. 30, 2013      
Calvert MOBs I, II, III Prince Frederick, Maryland        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 10,390      
Initial Costs, Land & Land Improvements [2] 51      
Initial Costs, Building and Building Improvements [2] 14,334      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 273      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 51      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 14,607      
Total [1],[2] 14,658      
Accumulated Depreciation [2] $ (1,278)      
Date Acquired [2] Aug. 30, 2013      
Calvert Medical Office Building I Prince Frederick, Maryland        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Date of construction [2] 1991      
Calvert Medical Office Building II Prince Frederick, Maryland        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Date of construction [2] 1999      
Calvert Medical Office Building III Prince Frederick, Maryland        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Date of construction [2] 2000      
Dunkirk Medical Center Dunkirk, Maryland        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 2,923      
Initial Costs, Land & Land Improvements [2] 351      
Initial Costs, Building and Building Improvements [2] 2,991      
Costs Capitalized Subsequent to Acquisition, Land & Improvements [2] 20      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 25      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 371      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 3,016      
Total [1],[2] 3,387      
Accumulated Depreciation [2] $ (337)      
Date of construction [2] 1997      
Date Acquired [2] Aug. 30, 2013      
Prestige Senior Living Beaverton Hills        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 8,994      
Initial Costs, Land & Land Improvements [2] 1,387      
Initial Costs, Building and Building Improvements [2] 10,324      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 1,387      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 10,324      
Total [1],[2] 11,711      
Accumulated Depreciation [2] $ (857)      
Date of construction [2] 2000      
Date Acquired [2] Dec. 02, 2013      
Prestige Senior Living High Desert        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 7,780      
Initial Costs, Land & Land Improvements [2] 835      
Initial Costs, Building and Building Improvements [2] 11,252      
Costs Capitalized Subsequent to Acquisition, Land & Improvements [2] 13      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 848      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 11,252      
Total [1],[2] 12,100      
Accumulated Depreciation [2] $ (971)      
Date of construction [2] 2003      
Date Acquired [2] Dec. 02, 2013      
MorningStar of Billings        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 19,161      
Initial Costs, Land & Land Improvements [2] 4,067      
Initial Costs, Building and Building Improvements [2] 41,373      
Costs Capitalized Subsequent to Acquisition, Land & Improvements [2] 14      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 68      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 4,081      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 41,441      
Total [1],[2] 45,522      
Accumulated Depreciation [2] $ (3,616)      
Date of construction [2] 2009      
Date Acquired [2] Dec. 02, 2013      
MorningStar of Boise        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 20,453      
Initial Costs, Land & Land Improvements [2] 1,663      
Initial Costs, Building and Building Improvements [2] 35,752      
Costs Capitalized Subsequent to Acquisition, Land & Improvements [2] 12      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 1,675      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 35,752      
Total [1],[2] 37,427      
Accumulated Depreciation [2] $ (2,947)      
Date of construction [2] 2007      
Date Acquired [2] Dec. 02, 2013      
Prestige Senior Living Huntington Terrace        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 9,962      
Initial Costs, Land & Land Improvements [2] 1,236      
Initial Costs, Building and Building Improvements [2] 12,083      
Costs Capitalized Subsequent to Acquisition, Land & Improvements [2] 2      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 11      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 1,238      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 12,094      
Total [1],[2] 13,332      
Accumulated Depreciation [2] $ (1,019)      
Date of construction [2] 2000      
Date Acquired [2] Dec. 02, 2013      
MorningStar of Idaho Falls        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 17,498      
Initial Costs, Land & Land Improvements [2] 2,006      
Initial Costs, Building and Building Improvements [2] 40,397      
Costs Capitalized Subsequent to Acquisition, Land & Improvements [2] 5      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 68      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 2,011      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 40,465      
Total [1],[2] 42,476      
Accumulated Depreciation [2] $ (3,398)      
Date of construction [2] 2009      
Date Acquired [2] Dec. 02, 2013      
Prestige Senior Living Arbor Place        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 8,009      
Initial Costs, Land & Land Improvements [2] 355      
Initial Costs, Building and Building Improvements [2] 14,083      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 355      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 14,083      
Total [1],[2] 14,438      
Accumulated Depreciation [2] $ (1,157)      
Date of construction [2] 2003      
Date Acquired [2] Dec. 02, 2013      
Prestige Senior Living Orchard Heights        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 12,030      
Initial Costs, Land & Land Improvements [2] 545      
Initial Costs, Building and Building Improvements [2] 15,544      
Costs Capitalized Subsequent to Acquisition, Land & Improvements [2] 6      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 71      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 551      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 15,615      
Total [1],[2] 16,166      
Accumulated Depreciation [2] $ (1,270)      
Date of construction [2] 2002      
Date Acquired [2] Dec. 02, 2013      
Prestige Senior Living Southern Hills        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 7,311      
Initial Costs, Land & Land Improvements [2] 653      
Initial Costs, Building and Building Improvements [2] 10,753      
Costs Capitalized Subsequent to Acquisition, Land & Improvements [2] 31      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 684      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 10,753      
Total [1],[2] 11,437      
Accumulated Depreciation [2] $ (896)      
Date of construction [2] 2001      
Date Acquired [2] Dec. 02, 2013      
MorningStar of Sparks        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 23,191      
Initial Costs, Land & Land Improvements [2] 3,986      
Initial Costs, Building and Building Improvements [2] 47,968      
Costs Capitalized Subsequent to Acquisition, Land & Improvements [2] 3      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 23      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 3,989      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 47,991      
Total [1],[2] 51,980      
Accumulated Depreciation [2] $ (4,070)      
Date of construction [2] 2009      
Date Acquired [2] Dec. 02, 2013      
Prestige Senior Living Five Rivers        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 7,536      
Initial Costs, Land & Land Improvements [2] 1,298      
Initial Costs, Building and Building Improvements [2] 14,064      
Costs Capitalized Subsequent to Acquisition, Land & Improvements [2] 5      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 49      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 1,303      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 14,113      
Total [1],[2] 15,416      
Accumulated Depreciation [2] $ (1,241)      
Date of construction [2] 2002      
Date Acquired [2] Dec. 02, 2013      
Prestige Senior Living Riverwood        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 4,372      
Initial Costs, Land & Land Improvements [2] 1,028      
Initial Costs, Building and Building Improvements [2] 7,429      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 38      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 1,028      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 7,467      
Total [1],[2] 8,495      
Accumulated Depreciation [2] $ (642)      
Date of construction [2] 1999      
Date Acquired [2] Dec. 02, 2013      
Chula Vista Medical Arts Center - Plaza II        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 2,462      
Initial Costs, Building and Building Improvements [2] 7,453      
Costs Capitalized Subsequent to Acquisition, Land & Improvements [2] 9      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 369      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 2,471      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 7,822      
Total [1],[2] 10,293      
Accumulated Depreciation [2] $ (632)      
Date of construction [2] 1985      
Date Acquired [2] Dec. 23, 2013      
Coral Springs MOB I        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 2,614      
Initial Costs, Building and Building Improvements [2] 11,220      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 2,614      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 11,220      
Total [1],[2] 13,834      
Accumulated Depreciation [2] $ (956)      
Date of construction [2] 2005      
Date Acquired [2] Dec. 23, 2013      
Coral Springs MOB II        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 2,614      
Initial Costs, Building and Building Improvements [2] 12,130      
Costs Capitalized Subsequent to Acquisition, Land & Improvements [2] 1      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 2,615      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 12,130      
Total [1],[2] 14,745      
Accumulated Depreciation [2] $ (1,034)      
Date of construction [2] 2008      
Date Acquired [2] Dec. 23, 2013      
Chula Vista Medical Arts Center - Plaza I        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 6,130      
Initial Costs, Building and Building Improvements [2] 10,293      
Costs Capitalized Subsequent to Acquisition, Land & Improvements [2] 14      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 200      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 6,144      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 10,493      
Total [1],[2] 16,637      
Accumulated Depreciation [2] $ (832)      
Date of construction [2] 1975      
Date Acquired [2] Jan. 21, 2014      
Prestige Senior Living Auburn Meadows        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 10,278      
Initial Costs, Land & Land Improvements [2] 2,537      
Initial Costs, Building and Building Improvements [2] 17,261      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 3      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 2,537      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 17,264      
Total [1],[2] 19,801      
Accumulated Depreciation [2] $ (1,377)      
Date Acquired [2] Feb. 03, 2014      
Prestige Senior Living Auburn Meadows One        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Date of construction [2] 2003      
Prestige Senior Living Auburn Meadows Two        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Date of construction [2] 2010      
Prestige Senior Living Bridgewood        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 12,849      
Initial Costs, Land & Land Improvements [2] 1,603      
Initial Costs, Building and Building Improvements [2] 18,172      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 1,603      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 18,172      
Total [1],[2] 19,775      
Accumulated Depreciation [2] $ (1,437)      
Date of construction [2] 2001      
Date Acquired [2] Feb. 03, 2014      
Prestige Senior Living Monticello Park        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 17,927      
Initial Costs, Land & Land Improvements [2] 1,981      
Initial Costs, Building and Building Improvements [2] 23,056      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 1,981      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 23,056      
Total [1],[2] 25,037      
Accumulated Depreciation [2] $ (1,800)      
Date Acquired [2] Feb. 03, 2014      
Prestige Senior Living Monticello Park One        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Date of construction [2] 2001      
Prestige Senior Living Monticello Park Two        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Date of construction [2] 2010      
Prestige Senior Living Rosemont        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 9,258      
Initial Costs, Land & Land Improvements [2] 668      
Initial Costs, Building and Building Improvements [2] 14,564      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 668      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 14,564      
Total [1],[2] 15,232      
Accumulated Depreciation [2] $ (1,124)      
Date of construction [2] 2004      
Date Acquired [2] Feb. 03, 2014      
Wellmore of Tega Cay        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2],[3] $ 2,445      
Costs Capitalized Subsequent to Acquisition, Land & Improvements [2],[3] 2,740      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2],[3] 23,440      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2],[3] 5,185      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2],[3] 23,440      
Total [1],[2],[3] 28,625      
Accumulated Depreciation [2],[3] $ (1,176)      
Date Acquired [2],[3] Feb. 07, 2014      
Isle at Cedar Ridge        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 1,525      
Initial Costs, Building and Building Improvements [2] 16,277      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 185      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 1,525      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 16,462      
Total [1],[2] 17,987      
Accumulated Depreciation [2] $ (1,292)      
Date of construction [2] 2011      
Date Acquired [2] Feb. 28, 2014      
Prestige Senior Living West Hills        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 8,589      
Initial Costs, Land & Land Improvements [2] 842      
Initial Costs, Building and Building Improvements [2] 12,603      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 842      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 12,603      
Total [1],[2] 13,445      
Accumulated Depreciation [2] $ (995)      
Date of construction [2] 2002      
Date Acquired [2] Mar. 03, 2014      
HarborChase of Plainfield        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 1,596      
Initial Costs, Building and Building Improvements [2] 21,832      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 1,596      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 21,832      
Total [1],[2] 23,428      
Accumulated Depreciation [2] $ (1,627)      
Date of construction [2] 2010      
Date Acquired [2] Mar. 28, 2014      
Legacy Ranch Alzheimer's Special Care Center        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 917      
Initial Costs, Building and Building Improvements [2] 9,982      
Costs Capitalized Subsequent to Acquisition, Land & Improvements [2] 2      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 919      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 9,982      
Total [1],[2] 10,901      
Accumulated Depreciation [2] $ (759)      
Date of construction [2] 2012      
Date Acquired [2] Mar. 28, 2014      
The Springs Alzheimer's Special Care Center        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 595      
Initial Costs, Building and Building Improvements [2] 9,658      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 595      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 9,658      
Total [1],[2] 10,253      
Accumulated Depreciation [2] $ (734)      
Date of construction [2] 2012      
Date Acquired [2] Mar. 28, 2014      
Isle at Watercrest - Bryan        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 714      
Initial Costs, Building and Building Improvements [2] 18,140      
Costs Capitalized Subsequent to Acquisition, Land & Improvements [2] 5      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 212      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 719      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 18,352      
Total [1],[2] 19,071      
Accumulated Depreciation [2] $ (1,298)      
Date of construction [2] 2011      
Date Acquired [2] Apr. 21, 2014      
Watercrest at Bryan        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 2,509      
Initial Costs, Building and Building Improvements [2] 22,441      
Costs Capitalized Subsequent to Acquisition, Land & Improvements [2] 4      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 96      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 2,513      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 22,537      
Total [1],[2] 25,050      
Accumulated Depreciation [2] $ (1,739)      
Date of construction [2] 2009      
Date Acquired [2] Apr. 21, 2014      
Isle at Watercrest - Mansfield        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 997      
Initial Costs, Building and Building Improvements [2] 24,635      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 997      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 24,635      
Total [1],[2] 25,632      
Accumulated Depreciation [2] $ (1,745)      
Date of construction [2] 2011      
Date Acquired [2] May 05, 2014      
Houston Orthopedic & Spine Hospital        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 30,936      
Initial Costs, Land & Land Improvements [2] 3,867      
Initial Costs, Building and Building Improvements [2] 32,761      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 3,867      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 32,761      
Total [1],[2] 36,628      
Accumulated Depreciation [2] $ (2,207)      
Date of construction [2] 2007      
Date Acquired [2] Jun. 02, 2014      
Houston Orthopedic & Spine Hospital Medical Office Building        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 17,047      
Initial Costs, Land & Land Improvements [2] 3,738      
Initial Costs, Building and Building Improvements [2] 20,525      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 700      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 3,738      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 21,225      
Total [1],[2] 24,963      
Accumulated Depreciation [2] $ (1,402)      
Date of construction [2] 2007      
Date Acquired [2] Jun. 02, 2014      
Watercrest at Katy (Katy, Texas)        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 24,047      
Initial Costs, Land & Land Improvements [2] 4,000      
Costs Capitalized Subsequent to Acquisition, Land & Improvements [2] 90      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 32,370      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 4,090      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 32,370      
Total [1],[2] 36,460      
Accumulated Depreciation [2] $ (492)      
Date Acquired [2] Jun. 27, 2014      
Watercrest at Mansfield        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 26,165      
Initial Costs, Land & Land Improvements [2] 2,191      
Initial Costs, Building and Building Improvements [2] 42,740      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 56      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 2,191      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 42,796      
Total [1],[2] 44,987      
Accumulated Depreciation [2] $ (2,865)      
Date of construction [2] 2010      
Date Acquired [2] Jun. 30, 2014      
HarborChase Of Shorewood (Shorewood, Wisconsin)        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 14,755      
Initial Costs, Land & Land Improvements [2] 2,200      
Costs Capitalized Subsequent to Acquisition, Land & Improvements [2] 296      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 19,862      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 2,496      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 19,862      
Total [1],[2] 22,358      
Accumulated Depreciation [2] $ (572)      
Date Acquired [2] Jul. 08, 2014      
Oklahoma City Inpatient Rehabilitation Hospital        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 15,827      
Initial Costs, Land & Land Improvements [2] 3,341      
Initial Costs, Building and Building Improvements [2] 19,249      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 3,341      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 19,249      
Total [1],[2] 22,590      
Accumulated Depreciation [2] $ (1,356)      
Date of construction [2] 2012      
Date Acquired [2] Jul. 15, 2014      
Las Vegas Inpatient Rehabilitation Hospital        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 13,835      
Initial Costs, Land & Land Improvements [2] 2,650      
Initial Costs, Building and Building Improvements [2] 16,979      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 2,650      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 16,979      
Total [1],[2] 19,629      
Accumulated Depreciation [2] $ (1,209)      
Date of construction [2] 2007      
Date Acquired [2] Jul. 15, 2014      
South Bend Inpatient Rehabilitation Hospital        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 12,562      
Initial Costs, Land & Land Improvements [2] 2,339      
Initial Costs, Building and Building Improvements [2] 16,239      
Costs Capitalized Subsequent to Acquisition, Land & Improvements [2] 4      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 2,343      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 16,239      
Total [1],[2] 18,582      
Accumulated Depreciation [2] $ (1,172)      
Date of construction [2] 2009      
Date Acquired [2] Jul. 15, 2014      
Beaumont Specialty Hospital        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 20,852      
Initial Costs, Land & Land Improvements [2] 2,749      
Initial Costs, Building and Building Improvements [2] 28,863      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 2,749      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 28,863      
Total [1],[2] 31,612      
Accumulated Depreciation [2] $ (1,880)      
Date of construction [2] 2013      
Date Acquired [2] Aug. 15, 2014      
Hurst Specialty Hospital        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 18,288      
Initial Costs, Land & Land Improvements [2] 2,510      
Initial Costs, Building and Building Improvements [2] 24,091      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 2,510      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 24,091      
Total [1],[2] 26,601      
Accumulated Depreciation [2] $ (1,571)      
Date Acquired [2] Aug. 15, 2014      
Hurst Specialty Hospital One        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Date of construction [2] 2004      
Hurst Specialty Hospital Two        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Date of construction [2] 2012      
Claremont Medical Office        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 12,478      
Initial Costs, Land & Land Improvements [2] 6,324      
Initial Costs, Building and Building Improvements [2] 13,533      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 18      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 6,324      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 13,551      
Total [1],[2] 19,875      
Accumulated Depreciation [2] $ (930)      
Date of construction [2] 2008      
Date Acquired [2] Aug. 29, 2014      
Lee Hughes Medical Building        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 18,102      
Initial Costs, Land & Land Improvements [2] 69      
Initial Costs, Building and Building Improvements [2] 22,967      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 22      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 69      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 22,989      
Total [1],[2] 23,058      
Accumulated Depreciation [2] $ (1,337)      
Date of construction [2] 2008      
Date Acquired [2] Sep. 29, 2014      
Newburyport Medical Center        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 2,614      
Initial Costs, Building and Building Improvements [2] 12,135      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 2,614      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 12,135      
Total [1],[2] 14,749      
Accumulated Depreciation [2] $ (802)      
Date of construction [2] 2008      
Date Acquired [2] Oct. 31, 2014      
Northwest Medical Park        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 6,886      
Initial Costs, Land & Land Improvements [2] 610      
Initial Costs, Building and Building Improvements [2] 6,170      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 58      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 610      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 6,228      
Total [1],[2] 6,838      
Accumulated Depreciation [2] $ (431)      
Date of construction [2] 2004      
Date Acquired [2] Oct. 31, 2014      
Fairfield Village of Layton        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 5,217      
Initial Costs, Building and Building Improvements [2] 54,167      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 5      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 5,217      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 54,172      
Total [1],[2] 59,389      
Accumulated Depreciation [2] $ (3,206)      
Date of construction [2] 2010      
Date Acquired [2] Nov. 20, 2014      
ProMed Medical Building I        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 6,865      
Initial Costs, Land & Land Improvements [2] 2,486      
Initial Costs, Building and Building Improvements [2] 6,728      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 2,486      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 6,728      
Total [1],[2] 9,214      
Accumulated Depreciation [2] $ (402)      
Date of construction [2] 2006      
Date Acquired [2] Dec. 19, 2014      
Midtown Medical Plaza        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 28,438      
Initial Costs, Land & Land Improvements [2] 10      
Initial Costs, Building and Building Improvements [2] 51,237      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 12      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 10      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 51,249      
Total [1],[2] 51,259      
Accumulated Depreciation [2] $ (2,629)      
Date of construction [2] 1994      
Date Acquired [2] Dec. 22, 2014      
Presbyterian Medical Tower        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 18,903      
Initial Costs, Land & Land Improvements [2] 40      
Initial Costs, Building and Building Improvements [2] 32,345      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 5      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 40      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 32,350      
Total [1],[2] 32,390      
Accumulated Depreciation [2] $ (1,664)      
Date of construction [2] 1989      
Date Acquired [2] Dec. 22, 2014      
Metroview Professional Building        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 8,979      
Initial Costs, Land & Land Improvements [2] 11      
Initial Costs, Building and Building Improvements [2] 15,910      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 14      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 11      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 15,924      
Total [1],[2] 15,935      
Accumulated Depreciation [2] $ (817)      
Date of construction [2] 1971      
Date Acquired [2] Dec. 22, 2014      
Physicians Plaza Huntersville        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 15,784      
Initial Costs, Land & Land Improvements [2] 520      
Initial Costs, Building and Building Improvements [2] 26,134      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 76      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 520      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 26,210      
Total [1],[2] 26,730      
Accumulated Depreciation [2] $ (1,409)      
Date of construction [2] 2004      
Date Acquired [2] Dec. 22, 2014      
Matthews Medical Office Building        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 11,075      
Initial Costs, Land & Land Improvements [2] 350      
Initial Costs, Building and Building Improvements [2] 19,624      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 350      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 19,624      
Total [1],[2] 19,974      
Accumulated Depreciation [2] $ (1,053)      
Date of construction [2] 1994      
Date Acquired [2] Dec. 22, 2014      
Outpatient Care Center        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 10,359      
Initial Costs, Land & Land Improvements [2] 1,169      
Initial Costs, Building and Building Improvements [2] 12,079      
Costs Capitalized Subsequent to Acquisition, Land & Improvements [2] 9      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 1,178      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 12,079      
Total [1],[2] 13,257      
Accumulated Depreciation [2] $ (635)      
Date of construction [2] 2012      
Date Acquired [2] Dec. 22, 2014      
Clyde, NC ("Asheville") 330 Physicians Center        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 19,262      
Initial Costs, Land & Land Improvements [2] 12      
Initial Costs, Building and Building Improvements [2] 26,868      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 5      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 12      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 26,873      
Total [1],[2] 26,885      
Accumulated Depreciation [2] $ (1,379)      
Date Acquired [2] Dec. 22, 2014      
Clyde, NC ("Asheville") 330 Physicians Center one        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Date of construction [2] 1987      
Clyde, NC ("Asheville") 330 Physicians Center Two        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Date of construction [2] 2005      
Spivey Station Physicians Center        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 9,428      
Initial Costs, Land & Land Improvements [2] 1,026      
Initial Costs, Building and Building Improvements [2] 12,246      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 1,026      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 12,246      
Total [1],[2] 13,272      
Accumulated Depreciation [2] $ (689)      
Date of construction [2] 2007      
Date Acquired [2] Dec. 22, 2014      
Spivey Station ASC Building        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 12,046      
Initial Costs, Land & Land Improvements [2] 929      
Initial Costs, Building and Building Improvements [2] 13,769      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 929      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 13,769      
Total [1],[2] 14,698      
Accumulated Depreciation [2] $ (761)      
Date of construction [2] 2009      
Date Acquired [2] Dec. 22, 2014      
Novi Orthopaedic Center        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 19,825      
Initial Costs, Land & Land Improvements [2] 1,314      
Initial Costs, Building and Building Improvements [2] 26,239      
Costs Capitalized Subsequent to Acquisition, Land & Improvements [2] 30      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 1,344      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 26,239      
Total [1],[2] 27,583      
Accumulated Depreciation [2] $ (1,460)      
Date of construction [2] 2008      
Date Acquired [2] Feb. 13, 2015      
UT Cancer Institute Building        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 20,817      
Initial Costs, Land & Land Improvements [2] 421      
Initial Costs, Building and Building Improvements [2] 27,621      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 66      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 421      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 27,687      
Total [1],[2] 28,108      
Accumulated Depreciation [2] $ (1,350)      
Date of construction [2] 2012      
Date Acquired [2] Feb. 20, 2015      
Fieldstone Memory Care        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 1,297      
Initial Costs, Building and Building Improvements [2] 9,965      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 1,297      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 9,965      
Total [1],[2] 11,262      
Accumulated Depreciation [2] $ (494)      
Date of construction [2] 2014      
Date Acquired [2] Mar. 31, 2015      
Bend Memorial Clinic MOB        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 9,069      
Initial Costs, Building and Building Improvements [2] 19,867      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 9,069      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 19,867      
Total [1],[2] 28,936      
Accumulated Depreciation [2] $ (1,025)      
Date of construction [2] 1976      
Date Acquired [2] May 11, 2015      
Stoneterra Medical Plaza        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 2,864      
Initial Costs, Building and Building Improvements [2] 10,412      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 2,864      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 10,412      
Total [1],[2] 13,276      
Accumulated Depreciation [2] $ (474)      
Date of construction [2] 2006      
Date Acquired [2] May 29, 2015      
Primrose Retirement Center of Anderson        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 1,342      
Initial Costs, Building and Building Improvements [2] 19,083      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 1,342      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 19,083      
Total [1],[2] 20,425      
Accumulated Depreciation [2] $ (852)      
Date of construction [2] 2008      
Date Acquired [2] May 29, 2015      
Primrose Retirement Center of Lancaster        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 2,840      
Initial Costs, Building and Building Improvements [2] 21,884      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 2,840      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 21,884      
Total [1],[2] 24,724      
Accumulated Depreciation [2] $ (1,077)      
Date of construction [2] 2007      
Date Acquired [2] May 29, 2015      
Primrose Retirement Center of Wausau        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 1,089      
Initial Costs, Building and Building Improvements [2] 18,653      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 1,089      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 18,653      
Total [1],[2] 19,742      
Accumulated Depreciation [2] $ (801)      
Date of construction [2] 2008      
Date Acquired [2] May 29, 2015      
Triangle Orthopaedic Durham        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 12,800      
Initial Costs, Land & Land Improvements [2] 3,191      
Initial Costs, Building and Building Improvements [2] 14,523      
Costs Capitalized Subsequent to Acquisition, Land & Improvements [2] 134      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 3,325      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 14,523      
Total [1],[2] 17,848      
Accumulated Depreciation [2] $ (641)      
Date of construction [2] 2000      
Date Acquired [2] Jun. 29, 2015      
Triangle Orthopaedic Roxboro        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 1,300      
Initial Costs, Land & Land Improvements [2] 287      
Initial Costs, Building and Building Improvements [2] 1,406      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 287      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 1,406      
Total [1],[2] 1,693      
Accumulated Depreciation [2] $ (66)      
Date of construction [2] 2000      
Date Acquired [2] Jun. 29, 2015      
Triangle Orthopaedic Chapel Hill        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 1,900      
Initial Costs, Land & Land Improvements [2] 360      
Initial Costs, Building and Building Improvements [2] 2,306      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 360      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 2,306      
Total [1],[2] 2,666      
Accumulated Depreciation [2] $ (99)      
Date of construction [2] 2011      
Date Acquired [2] Jun. 29, 2015      
Triangle Orthopaedic Oxford        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 2,800      
Initial Costs, Land & Land Improvements [2] 658      
Initial Costs, Building and Building Improvements [2] 3,074      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 658      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 3,074      
Total [1],[2] 3,732      
Accumulated Depreciation [2] $ (144)      
Date of construction [2] 2011      
Date Acquired [2] Jun. 29, 2015      
North Carolina Specialty Hospital        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 19,000      
Initial Costs, Land & Land Improvements [2] 3,173      
Initial Costs, Building and Building Improvements [2] 22,762      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 3,173      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 22,762      
Total [1],[2] 25,935      
Accumulated Depreciation [2] $ (945)      
Date of construction [2] 2004      
Date Acquired [2] Jun. 29, 2015      
Doctor's Park Building B        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 1,161      
Initial Costs, Building and Building Improvements [2] 2,919      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 1,161      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 2,919      
Total [1],[2] 4,080      
Accumulated Depreciation [2] $ (128)      
Date of construction [2] 2008      
Date Acquired [2] Jun. 30, 2015      
Doctor's Park Building C        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 2,323      
Initial Costs, Building and Building Improvements [2] 6,351      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 2,323      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 6,351      
Total [1],[2] 8,674      
Accumulated Depreciation [2] $ (276)      
Date of construction [2] 2006      
Date Acquired [2] Jun. 30, 2015      
Superior Residences of Panama City        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 2,099      
Initial Costs, Building and Building Improvements [2] 19,367      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 2,099      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 19,367      
Total [1],[2] 21,466      
Accumulated Depreciation [2] $ (818)      
Date of construction [2] 2015      
Date Acquired [2] Jul. 15, 2015      
540 New Waverly Place        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 6,868      
Initial Costs, Land & Land Improvements [2] 2,476      
Initial Costs, Building and Building Improvements [2] 11,009      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 2,476      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 11,009      
Total [1],[2] 13,485      
Accumulated Depreciation [2] $ (463)      
Date of construction [2] 2007      
Date Acquired [2] Jul. 20, 2015      
MedHelp        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 2,270      
Initial Costs, Building and Building Improvements [2] 10,359      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 2,270      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 10,359      
Total [1],[2] 12,629      
Accumulated Depreciation [2] $ (403)      
Date of construction [2] 2015      
Date Acquired [2] Jul. 31, 2015      
Patriot Professional Center        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 3,912      
Initial Costs, Building and Building Improvements [2] 11,781      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 3,912      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 11,781      
Total [1],[2] 15,693      
Accumulated Depreciation [2] $ (497)      
Date Acquired [2] Jul. 31, 2015      
Patriot Professional Center One        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Date of construction [2] 2006      
Patriot Professional Center Two        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Date of construction [2] 2014      
Liberty Professional Center        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 1,977      
Initial Costs, Building and Building Improvements [2] 4,462      
Costs Capitalized Subsequent to Acquisition, Land & Improvements [2] 10      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 1,987      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 4,462      
Total [1],[2] 6,449      
Accumulated Depreciation [2] $ (185)      
Date Acquired [2] Jul. 31, 2015      
Liberty Professional Center One        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Date of construction [2] 1979      
Liberty Professional Center Two        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Date of construction [2] 2013      
The Hampton at Meadows Place        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 715      
Initial Costs, Building and Building Improvements [2] 24,281      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 715      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 24,281      
Total [1],[2] 24,996      
Accumulated Depreciation [2] $ (898)      
Date Acquired [2] Jul. 31, 2015      
The Hampton at Meadows Place One        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Date of construction [2] 2007      
The Hampton at Meadows Place Two        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Date of construction [2] 2013      
The Pavilion at Great Hills        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 1,783      
Initial Costs, Building and Building Improvements [2] 29,318      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 1,783      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 29,318      
Total [1],[2] 31,101      
Accumulated Depreciation [2] $ (1,094)      
Date of construction [2] 2010      
Date Acquired [2] Jul. 31, 2015      
The Hampton at Meadows Place Three        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Date of construction [2] 2014      
The Beacon at Gulf Breeze        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 824      
Initial Costs, Building and Building Improvements [2] 24,106      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 824      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 24,106      
Total [1],[2] 24,930      
Accumulated Depreciation [2] $ (927)      
Date of construction [2] 2008      
Date Acquired [2] Jul. 31, 2015      
Parc at Piedmont        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 3,529      
Initial Costs, Building and Building Improvements [2] 43,080      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 3,529      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 43,080      
Total [1],[2] 46,609      
Accumulated Depreciation [2] $ (1,662)      
Date Acquired [2] Jul. 31, 2015      
Parc at Piedmont Two        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Date of construction [2] 2011      
Parc at Duluth        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 5,951      
Initial Costs, Building and Building Improvements [2] 42,458      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 5,951      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 42,458      
Total [1],[2] 48,409      
Accumulated Depreciation [2] $ (1,637)      
Date Acquired [2] Jul. 31, 2015      
Parc at Piedmont One        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Date of construction [2] 2001      
Parc at Duluth One        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Date of construction [2] 2003      
Broadway Medical Plaza 1        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 437      
Initial Costs, Building and Building Improvements [2] 9,281      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 437      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 9,281      
Total [1],[2] 9,718      
Accumulated Depreciation [2] $ (356)      
Date of construction [2] 1994      
Date Acquired [2] Aug. 21, 2015      
Broadway Medical Plaza 2        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 386      
Initial Costs, Building and Building Improvements [2] 12,460      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 386      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 12,460      
Total [1],[2] 12,846      
Accumulated Depreciation [2] $ (460)      
Date of construction [2] 1999      
Date Acquired [2] Aug. 21, 2015      
Parc at Duluth Two        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Date of construction [2] 2012      
Broadway Medical Plaza 4        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 170      
Initial Costs, Building and Building Improvements [2] 12,118      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 170      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 12,118      
Total [1],[2] 12,288      
Accumulated Depreciation [2] $ (429)      
Date of construction [2] 2007      
Date Acquired [2] Aug. 21, 2015      
Waterstone on Augusta (Greenville, SC)        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 12,698      
Initial Costs, Land & Land Improvements [2] 2,253      
Costs Capitalized Subsequent to Acquisition, Construction in Process [2] 21,901      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 2,253      
Gross Amounts at which Carried at Close of period, Construction in Process [1],[2] 21,901      
Total [1],[2] $ 24,154      
Date Acquired [2] Aug. 31, 2015      
Welbrook Senior Living Grand Junction (Grand Junction, CO)        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 1,050      
Costs Capitalized Subsequent to Acquisition, Construction in Process [2] 11,844      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 1,050      
Gross Amounts at which Carried at Close of period, Construction in Process [1],[2] 11,844      
Total [1],[2] $ 12,894      
Date Acquired [2] Sep. 04, 2015      
Wellmore of Lexington (Lexington, SC)        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 13,542      
Initial Costs, Land & Land Improvements [2] 2,300      
Costs Capitalized Subsequent to Acquisition, Construction in Process [2] 36,673      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 2,300      
Gross Amounts at which Carried at Close of period, Construction in Process [1],[2] 36,673      
Total [1],[2] $ 38,973      
Date Acquired [2] Sep. 14, 2015      
Palmilla Senior Living        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 27,000      
Initial Costs, Land & Land Improvements [2] 4,701      
Initial Costs, Building and Building Improvements [2] 38,321      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 4,701      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 38,321      
Total [1],[2] 43,022      
Accumulated Depreciation [2] $ (1,312)      
Date of construction [2] 2013      
Date Acquired [2] Sep. 30, 2015      
Cedar Lake Assisted Living and Memory Care        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 2,412      
Initial Costs, Building and Building Improvements [2] 25,126      
Costs Capitalized Subsequent to Acquisition, Land & Improvements [2] 2      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 2,414      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 25,126      
Total [1],[2] 27,540      
Accumulated Depreciation [2] $ (859)      
Date of construction [2] 2014      
Date Acquired [2] Sep. 30, 2015      
Fieldstone at Pear Orchard (Yakima, Washington)        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 8,861      
Initial Costs, Land & Land Improvements [2] 1,035      
Costs Capitalized Subsequent to Acquisition, Land & Improvements [2] 87      
Costs Capitalized Subsequent to Acquisition, Buildings and Building Improvements [2] 12,273      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 1,122      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 12,273      
Total [1],[2] 13,395      
Accumulated Depreciation [2] $ (27)      
Date Acquired [2] Oct. 12, 2015      
The Shores of Lake Phalen        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 2,724      
Initial Costs, Building and Building Improvements [2] 25,093      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 2,724      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 25,093      
Total [1],[2] 27,817      
Accumulated Depreciation [2] $ (793)      
Date of construction [2] 2012      
Date Acquired [2] Nov. 10, 2015      
Dogwood Forest of Grayson (Grayson, GA)        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 3,351      
Initial Costs, Land & Land Improvements [2] 1,788      
Costs Capitalized Subsequent to Acquisition, Land & Improvements [2] 50      
Costs Capitalized Subsequent to Acquisition, Construction in Process [2] 15,506      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 1,838      
Gross Amounts at which Carried at Close of period, Construction in Process [1],[2] 15,506      
Total [1],[2] $ 17,344      
Date Acquired [2] Nov. 24, 2015      
Center One        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 8,294      
Initial Costs, Building and Building Improvements [2] 21,756      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 8,294      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 21,756      
Total [1],[2] 30,050      
Accumulated Depreciation [2] $ (678)      
Date of construction [2] 2006      
Date Acquired [2] Nov. 30, 2015      
Red Bank Professional Office Building        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 1,721      
Initial Costs, Building and Building Improvements [2] 7,721      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 1,721      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 7,721      
Total [1],[2] 9,442      
Accumulated Depreciation [2] $ (236)      
Date of construction [2] 2001      
Date Acquired [2] Dec. 14, 2015      
Park Place Senior Living at WingHaven        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 1,283      
Initial Costs, Building and Building Improvements [2] 48,221      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 1,283      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 48,221      
Total [1],[2] 49,504      
Accumulated Depreciation [2] $ (1,269)      
Date Acquired [2] Dec. 17, 2015      
Park Place Senior Living at WingHaven One        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Date of construction [2] 2006      
Park Place Senior Living at WingHaven Two        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Date of construction [2] 2014      
Siena Pavilion IV        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 1,454      
Initial Costs, Building and Building Improvements [2] 4,786      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 1,454      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 4,786      
Total [1],[2] 6,240      
Accumulated Depreciation [2] $ (140)      
Date of construction [2] 2002      
Date Acquired [2] Dec. 18, 2015      
Siena Pavilion V        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 3,944      
Initial Costs, Building and Building Improvements [2] 20,355      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 3,944      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 20,355      
Total [1],[2] 24,299      
Accumulated Depreciation [2] $ (584)      
Date of construction [2] 2003      
Date Acquired [2] Dec. 18, 2015      
Siena Pavilion VI        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 2,599      
Initial Costs, Building and Building Improvements [2] 18,725      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 2,599      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 18,725      
Total [1],[2] 21,324      
Accumulated Depreciation [2] $ (505)      
Date of construction [2] 2005      
Date Acquired [2] Dec. 18, 2015      
Hearthside Senior Living of Collierville        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Initial Costs, Land & Land Improvements [2] $ 1,756      
Initial Costs, Building and Building Improvements [2] 13,379      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 1,756      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 13,379      
Total [1],[2] 15,135      
Accumulated Depreciation [2] $ (374)      
Date of construction [2] 2014      
Date Acquired [2] Dec. 29, 2015      
Cobalt Rehabilitation Hospital Surprise        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 15,379      
Initial Costs, Land & Land Improvements [2] 2,464      
Initial Costs, Building and Building Improvements [2] 17,983      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 2,464      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 17,983      
Total [1],[2] 20,447      
Accumulated Depreciation [2] $ (511)      
Date of construction [2] 2015      
Date Acquired [2] Dec. 30, 2015      
Cobalt Rehabilitation Hospital New Orleans        
SEC Schedule III, Real Estate and Accumulated Depreciation [Line Items]        
Encumbrances [2] $ 19,500      
Initial Costs, Land & Land Improvements [2] 3,283      
Initial Costs, Building and Building Improvements [2] 20,142      
Gross Amounts at which Carried at Close of period, Land & Land Improvements [1],[2] 3,283      
Gross Amounts at which Carried at Close of period, Building & Building Improvements [1],[2] 20,142      
Total [1],[2] 23,425      
Accumulated Depreciation [2] $ (91)      
Date of construction [2] 2016      
Date Acquired [2] Oct. 19, 2016      
[1] The aggregate cost for federal income tax purposes is approximately $3.0 billion.
[2] Buildings and building improvements are depreciated over 39 and 15 years, respectively. Tenant improvements are depreciated over the terms of their respective leases.
[3] Land and land improvements, initial cost, include the purchase price of land under development which is included as a component of construction in process in the consolidated balance sheets. As of December 31, 2016 these properties were under development; therefore, depreciation is not applicable.