A summary of the historical cost of property, plant and equipment is as follows:
 
 
 
 
December 31,
thousands
 
Estimated Useful Life
 
2014
 
2013
Land
 
n/a
 
$
2,839

 
$
2,584

Gathering systems
 
3 to 47 years
 
4,790,974

 
3,673,008

Pipelines and equipment
 
15 to 45 years
 
151,107

 
146,008

Assets under construction
 
n/a
 
464,507

 
405,633

Other
 
3 to 40 years
 
15,272

 
11,867

Total property, plant and equipment
 
 
 
5,424,699

 
4,239,100

Accumulated depreciation
 
 
 
1,040,328

 
855,845

Net property, plant and equipment
 
 
 
$
4,384,371

 
$
3,383,255



The cost of property classified as “Assets under construction” is excluded from capitalized costs being depreciated. These amounts represent property that is not yet suitable to be placed into productive service as of the respective balance sheet date.
At December 31, 2013, other long-term assets includes $4.6 million of unguaranteed residual value related to the capital lease component of a processing agreement assumed in connection with the acquisition of the Granger straddle plant as a part of the MGR acquisition in January 2012. This agreement, in which WES was the lessor, was replaced effective April 1, 2014, with a gas conditioning agreement that does not satisfy criteria required for lease classification. As such, during the second quarter of 2014, the $4.6 million capital lease asset was reclassified from other long-term assets to property, plant and equipment and commenced depreciation.
During 2014, WES recognized impairments of $3.1 million, primarily related to a non-operational plant in the Powder River Basin that was impaired to its estimated fair value of $2.4 million, using Level 3 fair-value inputs, the cancellation of various capital projects by the third-party operator of the Non-Operated Marcellus Interest systems and a compressor no longer in service at the Hilight system.
During 2013, WES recognized a $1.2 million impairment primarily related to the cancellation of various capital projects by the third-party operator of the Non-Operated Marcellus Interest systems.
During 2012, WES recognized a $6.0 million impairment related to a gathering system in central Wyoming that was impaired to its estimated fair value using Level 3 fair-value inputs and an impairment of $0.6 million for the original installation costs on a compressor relocated within WES’s operating assets.