0001052918-18-000178.txt : 20180515 0001052918-18-000178.hdr.sgml : 20180515 20180515122856 ACCESSION NUMBER: 0001052918-18-000178 CONFORMED SUBMISSION TYPE: 10-Q PUBLIC DOCUMENT COUNT: 33 CONFORMED PERIOD OF REPORT: 20180331 FILED AS OF DATE: 20180515 DATE AS OF CHANGE: 20180515 FILER: COMPANY DATA: COMPANY CONFORMED NAME: Bunker Hill Mining Corp. CENTRAL INDEX KEY: 0001407583 STANDARD INDUSTRIAL CLASSIFICATION: METAL MINING [1000] IRS NUMBER: 320196442 STATE OF INCORPORATION: NV FISCAL YEAR END: 0630 FILING VALUES: FORM TYPE: 10-Q SEC ACT: 1934 Act SEC FILE NUMBER: 333-150028 FILM NUMBER: 18834683 BUSINESS ADDRESS: STREET 1: 401 BAY STREET, SUITE 2702 STREET 2: P.O. BOX 136 CITY: TORONTO STATE: A6 ZIP: M5H 2Y4 BUSINESS PHONE: 416-477-7771 MAIL ADDRESS: STREET 1: 401 BAY STREET, SUITE 2702 STREET 2: P.O. BOX 136 CITY: TORONTO STATE: A6 ZIP: M5H 2Y4 FORMER COMPANY: FORMER CONFORMED NAME: LIBERTY SILVER CORP DATE OF NAME CHANGE: 20100406 FORMER COMPANY: FORMER CONFORMED NAME: Liberty Silver Corp DATE OF NAME CHANGE: 20100212 FORMER COMPANY: FORMER CONFORMED NAME: Lincoln Mining Corp DATE OF NAME CHANGE: 20070723 10-Q 1 bunker10qmay14-18.htm BUNKER HILL MINING CORP. FORM 10-Q Bunker Hill Mining Corp.




UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549


FORM 10-Q


x QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the quarterly period ended March 31, 2018


¨ TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934


Commission File Number: 333-150028


BUNKER HILL MINING CORP.

(FORMERLY LIBERTY SILVER CORP.)

 (Exact name of registrant as specified in its charter)


Nevada

 

32-0196442

(State or other jurisdiction of incorporation)

 

(IRS Employer Identification Number)

 

401 Bay Street, Suite 2702

Toronto, Ontario, Canada, M5H 2Y4

(Address of principal executive offices)

416-477-7771


Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.   x   Yes  ¨  No


Indicate by check mark whether the registrant has submitted electronically and posted on its corporate Web site, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit and post such files).  x  Yes¨  No


Indicate by check mark whether the Registrant is  ¨  a large accelerated filer, ¨  an accelerated file, ¨  a non-accelerated filer, x  a smaller reporting company (as defined in Rule 12b-2 of the Exchange Act) or ¨ an emerging growth company


Indicate by check mark whether the Registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act)

¨  Yes  x   No


As of May 15, 2018, the Issuer had 33,013,715 shares of common stock issued and outstanding.


 



1





PART I - FINANCIAL INFORMATION


ITEM 1.

FINANCIAL STATEMENTS


The financial statements of Bunker Hill Mining Corp. (formerly Liberty Silver Corp.), (Bunker Hill”, the “Company”, or the “Registrant”) a Nevada corporation, included herein were prepared, without audit, pursuant to rules and regulations of the Securities and Exchange Commission.  Because certain information and notes normally included in financial statements prepared in accordance with accounting principles generally accepted in the United States of America were condensed or omitted pursuant to such rules and regulations, these financial statements should be read in conjunction with the audited consolidated financial statements and notes thereto included in the Company's Form 10-K for the fiscal year ended June 30, 2017, and all amendments thereto.







BUNKER HILL MINING CORP. (FORMERLY LIBERTY SILVER CORP.)

INTERIM CONDENSED CONSOLIDATED UNAUDITED FINANCIAL STATEMENTS

PERIOD ENDED MARCH 31, 2018



INDEX TO THE INTERIM CONDENSED CONSOLIDATED UNAUDITED FINANCIAL STATEMENTS:

Page

 

 

Interim Condensed Consolidated Balance Sheets

3

 

 

Interim Condensed Consolidated Statements of Operations and Comprehensive Loss

4

 

 

Interim Condensed Consolidated Statements of Cash Flows

5

 

 


Notes to Interim Condensed Consolidated Financial Statements   


7-10






2






Bunker Hill Mining Corp. (Formerly Liberty Silver Corp.)

Interim Condensed Consolidated Balance Sheets

(Unaudited)

As at,

March 31,    2018

June 30,         2017

 

$

$

 

 

(unaudited)

 

ASSETS

 

 

Current assets

 

 

 

Cash and cash equivalents

2,061,215

593,515

 

Accounts receivable

56,159

5,474

 

Deposit

122,769

68,582

 

Other assets

87,980

22,056

 

Prepaid expenses

346,362

132,551

Total current assets

2,674,485

822,178

 

 

 

 

Property and equipment

 

 

 

Equipment

58,610

9,016

 

Long term deposit

41,860

---

 

Mining interests (note 3)

1

300,001

Total property and equipment

100,471

309,017

 

 

 

 

 Total assets

2,774,956

1,131,195

 

 

 

 

LIABILITIES

 

 

Current liabilities

 

 

 

Accounts payable

65,108

261,925

 

Accrued liabilities

130,746

156,408

 

Other liability

32,581

---

Total current liabilities  

228,435

418,333

 

 

 

 

Long term liabilities

 

 

Derivative liability (note 4)

2,776,218

---

 

 

 

Total liabilities

3,004,653

418,333

 

 

 

 

SHAREHOLDERS' EQUITY

 

 

 

Preferred shares, $0.001 par value, 10,000,000 preferred shares authorized;

 

 

 

Nil preferred shares issued and outstanding (note 4)

---

---

 

Common shares, $0.001 par value, 300,000,000 common shares authorized;

 

 

 

33,013,715 and 24,889,395 common shares issued and outstanding, respectively

33,013

24,889

 

Additional paid-in-capital

23,158,244

19,131,675

 

Deficit accumulated during the exploration stage

(23,420,954)

(18,443,702)

Total shareholders’ equity

(229,697)

712,862

 

 

 

 

Total liabilities and shareholders’ equity  

2,774,956

1,131,195

 

 

 

 

Going concern (note 1)

 

 

Commitments and contingencies (note 5)

 

 


The accompanying notes are an integral part of these unaudited interim condensed consolidated financial statements



3







Bunker Hill Mining Corp. (Formerly Liberty Silver Corp.)

Interim Condensed Consolidated Statements of Operations and Comprehensive Loss

(Unaudited)

 

For the Three Months ended

March 31,

For the Nine Months ended

March 31,

 

 

2018

2017

2018

2017

 

 

$

$

$

$

 

 

 

 

 

 

Revenue

---

---

---

---

 

 

 

 

 

 

Operating expenses

 

 

 

 

 

Operation and administration (note 6)

709,806

33,484

1,764,860

110,792

 

Lease payments and exploration (note 3)

674,554

36,368

2,849,446

66,561

 

Legal and accounting

91,309

275,148

351,947

356,882

 

Consulting

142,383

58,500

527,538

83,500

Total operating expenses

1,618,052

403,500

5,493,791

617,735

 

 

 

 

 

 

Loss from operations

1,618,052

403,500

5,493,791

617,735

 

 

 

 

 

 

Other income or gain (expense or loss)

 

 

 

 

 

Change in derivative liability

27,794

---

476,943

---

 

Gain on foreign exchange

7,202

3,749

39,596

4,398

 

Interest expense

---

(1,362)

---

(77,512)

Total other income or gain (expense or loss)

34,996

2,387

516,539

(73,114)

 

 

 

 

 

 

Loss before income tax

(1,583,056)

(401,113)

(4,977,252)

(690,849)

Provision for income taxes

---

---

---

---

 

 

 

 

 

 

Net loss and comprehensive loss

(1,583,056)

(401,113)

(4,977,252)

(690,849)

Loss per common share – basic and fully diluted

(0.05)

(0.02)

(0.18)

(0.05)

Weighted average common shares – basic and fully diluted

33,013,715

19,494,149

28,330,058

14,682,076

 

 

 

 

 

 

 

 



The accompanying notes are an integral part of these unaudited interim condensed consolidated financial statements




4








Bunker Hill Mining Corp. (Formerly Liberty Silver Corp.)

Interim Condensed Consolidated Statements of Cash Flows

(Unaudited)

For the nine months ended March 31,

2018

2017

 

 

 

$

$

 

 

 

 

 

Cash flows from operating activities:

 

 

 

Net loss and comprehensive loss

(4,977,252)

(690,849)

 

Adjustments to reconcile net loss to net cash used in operating

 

 

 

activities:

 

 

 

 

Stock-based compensation

103,815

1,381

 

 

Depreciation expense

3,796

---

 

 

Write-down of mining interest

300,000

---

 

 

Change in fair value of warrant liability

(476,943)

---

 

 

 

 

 

 

Changes in operating assets and liabilities:

 

 

 

 

Increase in accounts receivable

(50,685)

---

 

 

Increase in deposit

(54,187)

---

 

 

(Increase) decrease in other assets

(65,924)

8,260

 

 

(Increase) decrease in prepaid expenses

(213,811)

(10,625)

 

 

Increase (decrease) in accounts payable

(196,817)

127,816

 

 

Increase in accrued liabilities

(25,662)

(52,714)

 

 

Increase in other liabilities

32,581

---

 

 

Increase in interest payable

---

77,512

Net cash used in operating activities

(5,621,089)

(539,219)

 

 

 

 

 

Cash flows from investing activities:

 

 

Acquisition of equipment

(53,392)

---

Addition of long term deposit

(41,860)

---

Net cash used in investing activities

(95,252)

---

 

 

 

Cash flows from financing activities:

 

 

 

Proceeds from unsecured promissory notes

---

100,000

 

Proceeds from issuance of common stock

7,937,538

1,132,917

 

Share issue costs

(753,497)

---

 

Proceeds from convertible loan payable

---

236,085

Net cash from financing activities

7,184,041

1,469,002

 

 

 

 

 

Increase in cash and cash equivalents

1,467,700

929,783

Cash and cash equivalents, beginning of period

593,515

9,361

 

 

 

 

 

Cash and cash equivalents, end of period

2,061,215

939,144

 

 

 

 

 

The accompanying notes are an integral part of these unaudited interim condensed consolidated financial statements





5






Bunker Hill Mining Corp. (Formerly Liberty Silver Corp.)

Interim Condensed Consolidated Statements of Cash Flows (Continued)

(Unaudited)

For the nine months ended March 31,

2018

2017

 

 

 

$

$

 

 

 

 

 

Supplemental disclosures:

 

 

 

Non-cash financing activities:

 

 

 

 

Common stock issued to settle accrued interest payable

---

285,810

 

 

Common stock issued to settle convertible loan payable

---

1,400,000

 

 

 

 

 

The accompanying notes are an integral part of these unaudited interim condensed consolidated financial statements



6




Bunker Hill Mining Corp. (Formerly Liberty Silver Corp.)

Notes to Unaudited Interim Condensed Consolidated Financial Statements

For the Nine Months Ended March 31, 2018




Note 1 – Basis of Presentation and Going Concern

The accompanying unaudited interim condensed consolidated financial statements have been prepared in accordance with accounting principles generally accepted in the United States of America and the rules and regulations of the United States Securities and Exchange Commission for interim financial information. Accordingly, they do not include all the information and footnotes necessary for a comprehensive presentation of financial position, results of operations, shareholders’ equity or cash flows. It is management's opinion, however, that all material adjustments (consisting of normal recurring adjustments) have been made which are necessary for a fair financial statement presentation. The unaudited interim condensed consolidated financial statements should be read in conjunction with the Company’s Annual Report on Form 10-K, which contains the annual audited consolidated financial statements and notes thereto, together with the Management’s Discussion and Analysis, for the year ended June 30, 2017. The interim results for the period ended March 31, 2018 are not necessarily indicative of the results for the full fiscal year. The interim unaudited condensed consolidated financial statements are presented in USD, which is the functional currency.

These unaudited interim condensed consolidated financial statements have been prepared on a going concern basis. The Company has incurred losses since inception resulting in an accumulated deficit of $23,420,954 and further losses are anticipated in the development of its business. The ability of the Company to emerge from the exploration stage is dependent upon, among other things, obtaining additional financing to continue operations, exploration and development of the mineral properties and the discovery of, development, and sale of reserves. In order to continue to meet its plans and fiscal obligations in the current fiscal year and beyond, the Company must seek additional financing. Its ability to continue as a going concern is dependent upon the ability of the Company to generate profitable operations in the future and/or to obtain the necessary financing to meet its obligations and repay its liabilities arising from normal business operations when they come due. The accompanying unaudited interim condensed consolidated financial statements do not include any adjustments that might result from the outcome of this uncertainty.

Management is considering various financing alternatives including, but not limited to, raising capital through the capital markets and debt financing.  These interim condensed consolidated financial statements do not include any adjustments relating to the recoverability and classification of recorded assets, or the amounts of and classification of liabilities that might be necessary in the event the Company cannot continue in existence.  The ability of the Company to emerge from the exploration stage is dependent upon, among other things, obtaining additional financing to continue operations, explore and develop the mineral properties and the discovery, development, and sale of reserves.  These factors, among others, raise substantial doubt about the Company’s ability to continue as a going concern.

Note 2 – Nature of Operations

Bunker Hill Mining Corp. (formerly Liberty Silver Corp.) (the “Company” or “Bunker”) was incorporated under the laws of the state of Nevada, U.S.A on February 20, 2007 under the name Lincoln Mining Corp.  Pursuant to a Certificate of Amendment dated February 11, 2010, the Company changed its name to Liberty Silver Corp., and on September 29, 2017 the Company changed its name to Bunker Hill Mining Corp.  The Company’s registered office is located at 1802 N. Carson Street, Suite 212, Carson City Nevada 89701, and its head office is located at 401 Bay Street, Suite 2702, Toronto, Ontario, Canada, M5H 2Y4, and its telephone number is 888-749-4916.  As of the date of this Form 10-Q, the Company had two subsidiaries, Bunker Hill Operating LLC, a Colorado corporation that is currently dormant, and American Zinc. Corp., an Idaho corporation created to facilitate the work being conducted at the Bunker Hill Mine in Idaho.

The Company was incorporated for the purpose of engaging in mineral exploration activities.  It continues to work at developing its projects with a view towards putting them into production.



7




Bunker Hill Mining Corp. (Formerly Liberty Silver Corp.)

Notes to Unaudited Interim Condensed Consolidated Financial Statements

For the Nine Months Ended March 31, 2018



Note 3 - Mining Interests

Bunker Hill Mine Complex

On November 27, 2016, the Company entered into a non-binding letter of intent with Placer Mining Corp. (“Placer Mining”), which letter of intent was further amended on March 29, 2017, to acquire the Bunker Hill Mine located in Kellogg, Idaho, in the Coeur d’Alene Basin (the “Letter of Intent”).  Pursuant to the terms and conditions of the Letter of Intent, the acquisition, which was subject to due diligence, would include mining claims, surface rights, fee parcels, mineral interests, existing infrastructure, machinery and buildings at the Kellogg Tunnel portal in Milo Gulch, or anywhere underground at the Bunker Hill Mine Complex, but specifically excluding certain areas of the mine and property.  The acquisition would also include all current and historic data relating to the Bunker Hill Mine Complex, such as drill logs, reports, maps, and similar information located at the mine site or any other location.

The Company made certain payments totaling $300,000 as part of this Letter of Intent.  During the quarter ended September 30, 2017, additional payments totaling $200,000 were made to extend the negotiation period.  On August 28, 2017, the Company announced that it signed a definitive agreement (the “Agreement”) for the lease and option to purchase the Bunker Hill Mine assets (the “Bunker Assets”) (see note 5). All payments related to the lease are being expensed until the option is exercised and the $500,000 previously capitalized has been expensed in the quarter ended December 31, 2017.  During the quarter ended March 31, 2018, the $300,000 of lease payments have been expensed.

In November 2017, the Company negotiated an extension to the commencement of the lease to afford it time to complete an equity financing (see note 5).

Trinity Project

On August 31, 2017, the Company and Renaissance Exploration Inc. signed a notice of termination and release of exploration Earn-In Agreement.  Upon signing this agreement, the Company has terminated the March 29, 2010 Earn-In Agreement.  

Note 4 – Capital Stock and Warrants

Authorized

The total authorized capital is as follows:

-

300,000,000 common shares with a par value of $0.001 per common share; and

-

10,000,000 preferred shares with a par value of $0.001 per preferred share

Issued and outstanding

In December 2017, Bunker announced that it closed a private placement led by Red Cloud Klondike Strike Inc. and including Haywood Securities Inc. (collectively, the “Agents”) to raise gross proceeds of CDN$10,155,400 (the “Offering”). Pursuant to the Offering, the Company issued 8,124,320 units (the "Units") at a price of CDN$1.25 per Unit.  Each Unit was comprised of one common share of the Company (a "Common Share") and one half of one transferable common share purchase warrant (a "Warrant"), each Warrant having a three-year life and entitling the holder thereof to acquire one Common Share at a price of CDN$2.00.

The Company has accounted for the warrant liability in accordance with ASC Topic 815. These warrants are considered derivative instruments as they were issued in a currency other than the Company’s functional currency of the US dollar. The estimated fair value of warrants accounted for as liabilities was determined on the date of issue and marks to market at each financial reporting period. The change in fair value of the warrant liability is recorded in the interim condensed consolidated statement of operations and comprehensive loss as a gain or loss and is estimated using the Binomial model.



8




Bunker Hill Mining Corp. (Formerly Liberty Silver Corp.)

Notes to Unaudited Interim Condensed Consolidated Financial Statements

For the Nine Months Ended March 31, 2018



The proceeds from the Offering are being used primarily for lease payments, acquisition payments, exploration and development at the Bunker Hill Mine and for general corporate and working capital purposes.

In connection with the Offering, the Agents received a cash fee in an amount equal to 8.0% of the gross proceeds of the Offering (excluding proceeds from certain president's list subscribers) and were granted common share purchase warrants (the "Broker Warrants") entitling them to subscribe for that number of Common Shares equal to 4.0% of the aggregate number of Units sold in the Offering (excluding Units sold to certain president's list subscribers). Each Broker Warrant is exercisable at a price equal to CDN$2.00 for thirty-six months following its issuance. The Company issued an aggregate of 278,160 Broker Warrants to the Agents in connection with the Offering.

At March 31, 2018 there were 33,013,715 common shares issued and outstanding.

Warrants

As of March 31, 2018, the Company had 4,340,320 warrants outstanding, all issued pursuant to the equity financing completed in December 2017 and described above.

Stock Options

In December 2017, 100,000 options were granted to a consultant with a five-year life and an exercise price of CDN$1.65.  These options vested immediately and, using the Black Scholes option pricing method, had a value of CDN$103,815, which value is expensed on as stock based compensation on the statement of operations.  As at March 31, 2018, there were 2,391,000 stock options outstanding, exercisable at a weighted average exercise price of CDN$1.01 per share.  Of this total, 56,000 have an exercise price of $0.1875 and expire on February 17, 2020, 2,235,000 have an exercise price of CDN$1.00 and expire May 2, 2022 and 100,000 have an exercise price of CDN$1.65 and expire December 13, 2022.

Note 5 – Commitments and Contingencies

Effective June 1, 2017, the Company has a lease agreement for office space at 401 Bay Street, Suite 2702, Toronto, Ontario, Canada, M5H 2Y4.  The 5-year lease provides for a monthly base rent of CDN$12,964 for the first two years, increasing to CDN$13,504 per month for years three through five.  The Company has signed sub-leases with other companies that cover 78% of the monthly lease amount.

Pursuant to its Agreement for the lease and option to purchase the Bunker Assets, the Company made two $500,000 bonus payments to Placer Mining.  The 24-month lease was to commence November 1, 2017 but was deferred to December 1, 2017 and continues until October 31, 2019.   The lease period can be extended by a further 12 months at the Company’s discretion.  During the term of the lease, the Company must make $100,000 monthly mining lease payments, paid quarterly.

The Company has an option to purchase the Bunker Assets at any time before the end of the lease and any extension for a purchase price of $25 million with purchase payments to be made over a ten-year period. Under terms of the agreement, there is a 3% net smelter return royalty (“NSR”) on sales during the Lease and a 1.5% NSR on the sales after the purchase option is exercised, which post-acquisition NSR is capped at $60 million.

In addition to the payments to Placer Mining, pursuant to an agreement with the United States Environmental Protection Agency (“EPA”) whereby for so long as Bunker leases, owns and/or occupies the Bunker Hill Mine, the Company will make payments to the EPA on behalf of the current owner in satisfaction of the EPA’s claim for cost recovery.  Payments to the EPA will start with $1 million 30 days after a fully ratified agreement is signed followed by $2 million on November 1, 2018 and $3 million on each of the next 5 anniversaries with a final $2 million payment on November 1, 2024.



9




Bunker Hill Mining Corp. (Formerly Liberty Silver Corp.)

Notes to Unaudited Interim Condensed Consolidated Financial Statements

For the Nine Months Ended March 31, 2018



In addition to the above payments, the EPA will also be paid $480,000 within 30 days after a fully ratified agreement is signed with the EPA and every six months thereafter for as long as Bunker leases, owns, and/or occupies the mine.  These payments are for estimated ongoing water treatment costs which the Company agreed to begin payment upon commencement of the mine lease.


Note 6 – Related Party Transactions

Through November 30, 2017, each of Messrs. Bruce Reid (CEO), Julio DiGirolamo (CFO), Howard Crosby (Executive Vice President) and John Ryan (Director) received $5,000 per month for services to the Company.  Payments to Messrs., Crosby and Ryan continued at this rate through March 31, 2018.  Commencing December 1, 2017, commensurate with the increased activities in the Company, Messrs. Reid and DiGirolamo’s pay increased to $20,000 and $15,000 per month, respectively.  In early December 2017, the Board approved and ratified compensation to Mr. Reid for unaccrued and unpaid salary and bonus, including for risk-capital sums advanced by Mr. Reid to the Company in order that the Company could complete many of its obligations and initiatives during 2017.  The payment, totaling $500,000 was accrued at December 31, 2017 and was paid in January 2018.



10






ITEM 2.

 MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS


SPECIAL NOTE OF CAUTION REGARDING FORWARD-LOOKING STATEMENTS


CERTAIN STATEMENTS IN THIS REPORT, INCLUDING STATEMENTS IN THE FOLLOWING DISCUSSION, ARE WHAT ARE KNOWN AS "FORWARD LOOKING STATEMENTS", WHICH ARE BASICALLY STATEMENTS ABOUT THE FUTURE. FOR THAT REASON, THESE STATEMENTS INVOLVE RISK AND UNCERTAINTY SINCE NO ONE CAN ACCURATELY PREDICT THE FUTURE. WORDS SUCH AS "PLANS," "INTENDS," "WILL," "HOPES," "SEEKS," "ANTICIPATES," "EXPECTS "AND THE LIKE OFTEN IDENTIFY SUCH FORWARD LOOKING STATEMENTS, BUT ARE NOT THE ONLY INDICATION THAT A STATEMENT IS A FORWARD LOOKING STATEMENT. SUCH FORWARD LOOKING STATEMENTS INCLUDE STATEMENTS CONCERNING OUR PLANS AND OBJECTIVES WITH RESPECT TO THE PRESENT AND FUTURE OPERATIONS OF THE COMPANY, AND STATEMENTS WHICH EXPRESS OR IMPLY THAT SUCH PRESENT AND FUTURE OPERATIONS WILL OR MAY PRODUCE REVENUES, INCOME OR PROFITS. NUMEROUS FACTORS AND FUTURE EVENTS COULD CAUSE THE COMPANY TO CHANGE SUCH PLANS AND OBJECTIVES OR FAIL TO SUCCESSFULLY IMPLEMENT SUCH PLANS OR ACHIEVE SUCH OBJECTIVES, OR CAUSE SUCH PRESENT AND FUTURE OPERATIONS TO FAIL TO PRODUCE REVENUES, INCOME OR PROFITS. THEREFORE, THE READER IS ADVISED THAT THE FOLLOWING DISCUSSION SHOULD BE CONSIDERED IN LIGHT OF THE DISCUSSION OF RISKS AND OTHER FACTORS CONTAINED IN THIS REPORT ON FORM 10-Q AND IN THE COMPANY'S OTHER FILINGS WITH THE SECURITIES AND EXCHANGE COMMISSION. NO STATEMENTS CONTAINED IN THE FOLLOWING DISCUSSION SHOULD BE CONSTRUED AS A GUARANTEE OR ASSURANCE OF FUTURE PERFORMANCE OR FUTURE RESULTS.


DESCRIPTION OF BUSINESS


The Corporation

Bunker Hill Mining Corp. (Formerly Liberty Silver Corp.) (the “Company” or the “Corporation”) was incorporated under the laws of the state of Nevada, U.S.A on February 20, 2007 under the name Lincoln Mining Corp.  Pursuant to a Certificate of Amendment dated February 11, 2010, the Company changed its name to Liberty Silver Corp.  On September 29, 2017, the Company changed its name to Bunker Hill Mining Corp. The Company’s registered office is located at 1802 N. Carson Street, Suite 212, Carson City Nevada 89701, and its head office is located at 401 Bay Street, Suite 2702, Toronto, Ontario, Canada, M5H 2Y4, and its telephone number is 416-477-7771.

Current Operations

Overview

The Company was incorporated for the purpose of engaging in mineral exploration and development activities.  On August 28, 2017, the Company announced that it signed a definitive agreement (the “Agreement”) for the lease and option to purchase of the Bunker Hill Mine (the “Mine”) in Idaho. The “Bunker Hill Lease with Option to Purchase” is between the Company and Placer Mining Corporation (“Placer Mining”), the current owner of the Mine.

Pursuant to its Agreement for the lease and option to purchase the Bunker Assets, the Company made two $500,000 bonus payments to Placer Mining by December 31, 2017.  The 24-month lease was to commence November 1, 2017, but has been deferred to December 1, 2017 and continues until October 31, 2019.   The lease period can be extended by a further 12 months at the Company’s discretion.  During the term of the lease, the Company must make $100,000 monthly mining lease payments, paid quarterly.



11





The Company has an option to purchase the Bunker Assets at any time before the end of the lease and any extension for a purchase price of 25 million with purchase payments to be made over a ten-year period. Under terms of the agreement, there is a 3% net smelter return royalty (“NSR”) on sales during the Lease and a 1.5% NSR on the sales after the purchase option is exercised, which post-acquisition NSR is capped at $60 million.

In addition to the payments to Placer Mining, pursuant to an agreement with the United States Environmental Protection Agency (“EPA”) whereby for so long as Bunker leases, owns and/or occupies the Bunker Hill Mine, the Company will make payments to the EPA on behalf of the current owner in satisfaction of the EPA’s claim for cost recovery.  Payments to the EPA will start with $1 million 30 days after a fully ratified agreement is signed followed by $2 million on November 1, 2018 and $3 million on each of the next 5 anniversaries with a final $2 million payment on November 1, 2024.

Management believes this lease and option will provide the Company time to both produce a mine plan and raise the money needed to move forward.  Management also believes that this is a strong signal to the market that the Bunker Hill Mine is “back in business”. Management is now able to push forward and advance the time line to realizing shareholder value.

The Bunker Hill Mine was the largest producing mine in the Coeur d'Alene zinc, lead and silver mining district in northern Idaho.  Historically, the mine produced over 35M tonnes of ore grading on average 8.76% lead, 3.67% zinc, and 155 g/t silver (Bunker Hill Mines Annual Report 1980). 

The Company believes that there are numerous targets of opportunity left in the mine from top to bottom, and particularly on strike to the west where more recent past drilling has resulted in major discoveries such as the Quill body of mineralized material.

The Bunker Hill Mine is now the Company’s only focus, with a view to raising capital to rehabilitate the mine and put it back into production.

The Company was previously focused on exploring and developing the Trinity Silver property located in Pershing County, Nevada (the “Trinity Project”).  The Trinity Project consists of a total of approximately 10,020 acres, including 5,676 acres of fee land and 253 unpatented mining claims located along the west flank of the Trinity Range in Pershing County, Nevada, about 25 miles by road northwest of Lovelock, NV, the county seat.    The annual cost to maintain the 253 claims is approximately $35,420 per year ($140 per claim per year).  In 2016, due to the lack of funding available to the Company, exploration progress was not on schedule with the Company’s exploration and evaluation plan and, as a result of these circumstances, the related carrying value of the properties may not be recoverable.  The Company therefore recorded an impairment charge related to the Trinity Project and reduced its carrying amount of the Trinity Project to $1 on the balance sheet for the fiscal years ended June 30, 2017 and 2016.

The Company did not commence development stage activities, but with adequate resources previous Management intended on: (i) expanding the known mineralized material through drilling, (ii) permitting for operation, if deemed economically viable, (iii) conducting metallurgical studies aimed at enhancing the recovery of the silver and by-product lead and zinc, and (iv) prepare an engineering design related to potential construction of a new mine. Exploration of the property would be conducted simultaneously with the mine development in order to locate additional mineralized materials.

With the Company’s Management focused on the Bunker Hill Mine, in September 2017, the Company agreed to relinquish its rights to the Trinity Project to Renaissance Exploration, Inc., its project partner, in return for releasing the Company from all past and future obligations.

Products

The Bunker Hill Mine is a Zinc-Silver-Lead Mine.  When back in production, the Company will mill mineralized material on-site or at a local third-party mill and plans to produce concentrates to be shipped to third party smelters for processing.

The Company will continue to explore the property with a view to proving resources.



12





Infrastructure

The acquisition of the Bunker Hill mine includes all mining rights and claims, surface rights, fee parcels, mineral interests, easements, existing infrastructure at Milo Gulch, and the majority of machinery and buildings at the Kellogg Tunnel portal level, as well as all equipment and infrastructure anywhere underground at the Bunker Hill Mine Complex.  The acquisition also includes all current and historic data relating to the Bunker Hill Mine Complex, such as drill logs, reports, maps, and similar information located at the mine site or any other location. 

Government Regulation and Approval

The current exploration activities and any future mining operations are subject to extensive laws and regulations governing the protection of the environment, waste disposal, worker safety, mine construction, and protection of endangered and protected species. The Company has made, and expects to make in the future, significant expenditures to comply with such laws and regulations.  Future changes in applicable laws, regulations and permits or changes in their enforcement or regulatory interpretation could have an adverse impact on the Company’s financial condition or results of operations.

It is anticipated that it may be necessary to obtain the following environmental permits or approved plans prior to commencement of mine operations:

§

Reclamation and Closure Plan

§

Water Discharge Permit  

§

Air Quality Operating Permit

§

Industrial Artificial (tailings) pond permit

§

Obtaining Water Rights for Operations

Property Description

The Company’s agreement with Placer Mining Corporation includes mineral rights to 434 patented mining claims covering 5769.467 acres of those 35 include surface ownership over approximately 259.1 acres.  The transaction also includes certain parcels of fee property which includes mineral and surface rights but are not patented mining claims. Mining claims and fee properties are located in Townships 47, 48 North, Range 2 East, Townships 47, 48 North, Range 3 East, Boise Meridian, Shoshone County, Idaho. The agreement specifically excludes the following: the Machine Shop Building and Parcel, including all fixed equipment located inside the building and personal property located upon the parcel; unmilled ore on deck and residual lead/zinc ore mined and broken, but not removed from the Bunker Hill Mine; the historic Caledonia Mine; the Crystal Vug; and the Silver Ridge exploration property.

Surface rights were originally owned by various previous owners of the claims until the acquisition of the properties by Bunker Limited Partners (“BLP”).  BLP sold off surface rights to various parties over the years while maintaining access to conduct mining operations and exploration activities as well as easements to a cross over and access other of its properties containing mineral rights. Said rights were reserved to its assigns and successors in continuous perpetuity. Idaho Law also allows mineral right holders access to mine and explore for minerals on properties to which they hold minerals rights.

Title to all patented mining claims included in the transaction was transferred from Bunker Hill Mining Co. (U.S.) Inc. by Warranty Deed in 1992. The sale of the property was properly approved of by the U.S. Trustee and U.S. Bankruptcy Court.  

Over 90% of surface ownership of patented mining claims not owned by Placer Mining Corp. is owned by different landowners. These include: Stimpson Lumber Co.; Riley Creek Lumber Co.; Powder LLC.; Golf LLC.; C & E Tree Farms; and Northern Lands LLC.

Patented mining claims in the State of Idaho do not require permits for underground mining activities to commence on private lands.  Other permits associated with underground mining may be required, such as water discharge and site disturbance permits.  The water discharge is being handled by the EPA at the existing water



13





treatment plant.  The Company expects to take on the water treatment responsibility in the future and obtain an appropriate discharge permit.  If the Company is able to purchase the EPA’s water treatment plant the water discharge permit comes along with the water treatment plant.

Competition

The Company competes with other mining and exploration companies in connection with the acquisition of mining claims and leases on zinc and other base and precious metals prospects as well as in connection with the recruitment and retention of qualified employees.  Many of these companies are much larger than the Company, have greater financial resources and have been in the mining business for much longer than it has.  As such, these competitors may be in a better position through size, finances and experience to acquire suitable exploration and development properties.  The Company may not be able to compete against these companies in acquiring new properties and/or qualified people to work on its current project, or any other properties that may be acquired in the future.

Given the size of the world market for base precious metals such as silver, lead and zinc, relative to the number of individual producers and consumers, it is believed that no single company has sufficient market influence to significantly affect the price or supply of these metals in the world market.

Employees

The Company is currently managed by Bruce Reid, President and CEO; Julio DiGirolamo, Chief Financial Officer; and Howard Crosby, Executive Vice President.

Completed Work and Future Plan of Operations

The Company has undertaken a due diligence program to assure itself of the viability of a restart of the Bunker Hill Mine. This necessitated an extensive review of the records that were present primarily at the Bunker Hill Mine offices. At those offices there are tens of thousands of pages of reports and records which detail the operations of the mine from its earliest days to the time of the shutdown in 1991 by BLP.

In addition to reports, there are several thousand historical maps of all scales and sizes as well as historical mineral diagrams which detail the mineral bodies that remained in the mine at the time of closure in January, 1991. These reports are not compliant with Canada National Instrument 43-101 and cannot be used for the purposes of establishing reserves pursuant to that standard.

The Company has satisfied itself that there is a large amount of zinc/lead/silver materials in numerous mineralized zones remaining within the Bunker Hill Mine. The Company is now developing a plan to bring a number of these zones into N.I. 43-101 compliance through new sampling and drilling programs.  The Company has identified several zones as having highest priority.  The Company has prioritized zones capable of providing the nearest term production as priority, these being the UTZ Zone, the Newgard Zone and the South Newgard Zone. These three mineral zones will be the first to be N.I. 43-101 verified and will provide the majority of the early feed upon mine start-up.

The Bunker Hill Mine main level is termed the nine level and is the largest level in the mine and is connected to the surface by the approximately 12,000 foot-long Kellogg Tunnel. Three major inclined shafts with associated hoists and hoistrooms are located on the nine level. These are the No. 1 shaft, which is used for primary muck hoisting in the main part of the mine; the No. 2 shaft, which is a primary shaft for men and materials in the main part of the mine; and the No. 3 Shaft, which is used for men, materials and muck hoisting for development in the northwest part of the mine.

The top stations of these shafts and the associated hoistrooms and equipment have all been examined by Company personnel and are in moderately good condition. The Company believes that all three shafts remain in a condition that they are repairable and can be bought back into good working order over the next few years.

The water level in the mine is held at approximately the ten level of the mine, roughly 200 feet below the nine level. The mine was historically developed to the 27 level, although the 25 level was the last major level that underwent significant development and past mining.



14





The southeastern part of the mine was historically serviced by the Cherry Raise, which consisted of a two-compartment shaft with double drum hoisting capability that ran at an incline up from the nine level to the four level. The central part of the mine was serviced upward by the Last Chance Shaft from the nine level to the historic three or four level. Neither the Cherry Raise or the Last Chance shaft are serviceable at this time. However, the upper part of the mine from nine level up to the four level has been developed by past operators by a thorough-going rubber tire ramp system, which is judged to be about 65% complete.

The Company has already repaired the first several thousand feet of the Russell Tunnel, which is a large rubber tire capable tunnel with an entry point at the head of Milo Gulch. This tunnel will provide early access to the UTZ and Newgard/South Newgard mineral zones. The Company has inspected a great deal of the ramp system between the nine level and the four level, and the ramps are in good shape with only minor repair and rehabilitation needed. The Company has made development plans to provide interconnectivity of the ramp system from the Russell Tunnel at the four level down to the nine level. Thus rubber-tired equipment will be used for mining and haulage throughout the upper mine mineral zones, which have already been identified, and for newly found zones.

The Kellogg Tunnel will be used as a tracked rail haulage tunnel for supply of men and materials into the mine and for haulage of mined material out of the mine. Historically the Kellogg Tunnel (or “KT” for short) was used in this manner when the mine was producing upwards of 3000 tons per day of mined material. The Company has inspected the KT for its entire length and has determined that significant timbered sections of the tunnel will need extensive repairs. These are areas that intersect various faults passing through the KT at normal to oblique angles and create unstable ground.

The Company has also determined that all of the track, as well as spikes, plates and ties holding the track will need to be replaced. Additionally, the water ditch that runs parallel to the track will need to be thoroughly cleaned out and new timber supports and boards that keep the water contained in its path will need to be installed. All new water lines, compressed air lines and electric power feeds will also need to be installed. The total cost estimate for this KT work is still in process at the time of the date of this report, but the time estimate for these repairs is approximately eighteen months.

It is anticipated that earliest production will come from the upper levels of the mine where company personnel have observed mining faces of mineralized material that are readily mineable, as they were left behind by past operators in a more or less fully developed state. These upper mineralized material zones could achieve limited mining at perhaps a rate of 500 tons per day by haulage out through the Russell Tunnel and then trucked from the Milo Gulch landing to one or more potential nearby custom milling facilities.

The Company believes that the potential does exist for early production by shipping mineralized material to a custom mill.  The Company has undertaken discussions with mill owners, but such discussions are still at an early stage and there is no guarantee that they will result in a positive outcome.  Longer term, the Company anticipates constructing its own milling facility. Initially the mill capacity is anticipated to be 1,500 tons per day and designed for ready expansion when needed.

The Company has identified multiple tailings disposal sites to the west-northwest of the mine. Ultimately the Company believes there are several options available for tailings disposal. With pragmatic use of the existing identified sites, the Company is confident in its ability to obtain tailings disposal adequate for approximately ten years of production. Down the road, alternatives may involve the use of “dry stack” tailings disposal.

As noted above, the E.P.A. for several decades has provided mine water treatment services for the Bunker Hill Mine. When the Company begins its lease of the mine, it is planned that the E.P.A. will be providing water treatment services under contract with the Company and such services will continue for at least five years or more. Although no firm agreement has yet been reached, recent discussions with the E.P.A. also indicate that overflows from the mill or decant from the tailings facilities could also be treated at the water treatment plant under the same treatment contract.

If all of the mine water, mill outflows, and tailings discharges can be treated by the E.P.A. treatment plant as currently contemplated, the Company will be initially relieved of the need to obtain a water discharge permit.



15





This will simplify the permitting required to return the mine to production and to build a mill and associated tailings ponds because a water discharge permit is often a difficult permit to obtain and is highly dependent on the characteristics of the surrounding watersheds and the capacity of these watersheds to tolerate additional discharges.

Upon initiating mine production from the UTZ, Newgard, and South Newgard zones at rates of approximately 1500 tons per day, the Company would anticipate mining approximately 450,000 tons per year of material. The three aforementioned zones are believed to have sufficient mineral to supply the Company mining needs for at least five years and beyond.

Once the repairs are completed to the Kellogg Tunnel, mineralized material haulage will be able to immediately occur out of this tunnel, which will enhance the production capabilities of the mine by several magnitudes. Some mineralized material will continue to be transported by rubber-tired equipment directly out the Russel Tunnel, but the majority of mineralized material will be dropped down existing internal passes and be hauled out of the KT on rail. By this time in the restart program the Company would expect to be in production at around 1500 tons per day, which is approximately the planned mill capacity. If all items proceed as planned, the Company believes a steady state production of 1,500 tons per day is achievable in approximately 36 months from the time of takeover of operations.

Additionally, once the KT repairs are completed, work on the repairs of the shafts and hoists can proceed with greater speed and the lower levels of the mine can be dewatered. The shaft work and pumping should commence at about year two of mine operations. Additionally, exploration and development work can begin on a major zinc mineral body, the “Quill”, which is already partly developed between the nine level and the fifteen level of the mine. This mineral body is expected to be in excess of 4 million tons of mineralized material and is primarily zinc.

Numerous other past-producing mineral bodies will begin to be revealed as the water levels are lowered and the mine is drained to the fullest. Some of these mineral bodies are lead-silver rich zones such as the Emery, Shea, Veral and the “J”, while others will add more material containing zinc such as the Tallon, Rosco, or Tony, while still others are best described as polymetallic such as the New Landers or the Francis.

The Company geologists and engineering personnel have studied the past records thoroughly and conclude that very good exploration and discovery potential exists at depth on downward rakes of known structures. Strata-bound zones such as the Newgard, Quill and Tallon await drilling to the west, while both the southeast and northwest limits of the main original Bunker Hill structure, in the heart of the Cate/Dull fault system, still remain viable as targets for future discovery of new mineral bodies or extensions of past mined structures.

Technical Report

As noted, the Company currently has in its possession, and has had access to, numerous historical technical reports that were completed in the past by highly qualified parties. The company does not currently have a technical report on the Bunker Hill Mine that is compliant with Canada National Instrument 43-101. The Company anticipates completing a compliant report within 3 to 4 months of the filing of this report, which will cover mineral zones that are adequately assessable for sampling and drilling. As repairs and improvements are made, additional mineral zones will be opened and subsequently drilled and sampled, and the resulting date will be used from time to time to update the N.I. 43-101 report as needed.

Subsequent Events

There are no subsequent events to report at this time.

RESULTS OF OPERATIONS

The following discussion and analysis provides information that we believe is relevant to an assessment and understanding of our results of operation and financial condition for the three and nine months ended March 31,



16





2018 as compared to the three and nine months ended March 31, 2017. Unless otherwise stated, all figures herein are expressed in U.S. dollars, which is the functional currency of the Company.

Results of Operations for the three months ended March 31, 2018 compared to the three months ended March 31, 2017.

Revenue

During the three and nine-month periods ended March 31, 2018 and 2017, the Company generated no revenue.

Operating expenses

During the three-month period ended March 31, 2018, the Company reported total operating expenses of $1,618,052 compared to $403,500 during the three-month period ended March 31, 2017, an increase of $1,214,552.  The increase results from activities related to the Bunker Hill Mine, activities that did not exist in the previous year.  This includes an increase in property and exploration costs of approximately $638,186 and an increase in operation and administrative expenses of $676,322 for the three months ended March 31, 2018 compared to the same period ended March 31, 2017.  Administrative expenses have increased due to the Company being active once again after having been delisted and relatively inactive for some years.

For financial accounting purposes, the Company expenses all property lease payments and exploration expenditures in the statement of operations. During the interim period ended March 31, 2018, activities were carried out on the Bunker Hill mine and payments made on account of the lease.

Consulting, legal and accounting, and operation and administration expenses increased due to the Company’s new life with commensurate management and legal activity towards corporate “clean up”, investor relations and public relations work, as well as work related to acquiring and evaluating the Bunker Hill mine.

Net loss and comprehensive loss  

The Company had a net loss and comprehensive loss of $1,583,056 for the three months ended March 31, 2018, compared to a net loss and comprehensive loss of $401,113 for the three months ended March 31, 2017, a change of $1,181,943.  The increase in net loss and comprehensive loss was due to increased corporate activities as described above.

The Company has accounted for the warrant liability in accordance with ASC Topic 815. These warrants are considered derivative instruments as they were issued in a currency other than the Company’s functional currency of the US dollar. The estimated fair value of warrants accounted for as liabilities was determined on the date of issue and marks to market at each financial reporting period. The change in fair value of the warrant is recorded in the condensed consolidated statement of operations and comprehensive loss as a gain or loss and is estimated using the Binomial model.  In the quarter ended March 31, 2018, the Company recorded a change in the value of the derivative liability of $27,794 in the current quarter, something that was not present in the comparative period.

The proceeds from the Offering are being used primarily for lease payments, acquisition payments, exploration and development at the Bunker Hill Mine and for general corporate and working capital purposes.


ANALYSIS OF FINANCIAL CONDITION

Liquidity and Capital Resources

The Company does not currently have sufficient working capital needed to meet its planned expenditures and obligations. In order to execute on its plans, continue to meet its fiscal obligations in the current fiscal year and beyond the next twelve months, the Company must seek additional financing.  Management will be pursuing a financing by way of issuing new common shares or various other financing alternatives.

In December 2017, Bunker announced that it closed a private placement led by Red Cloud Klondike Strike Inc. and including Haywood Securities Inc. (collectively, the “Agents”) to raise gross proceeds of C$10,155,400 (the



17





“Offering”). Pursuant to the Offering, the Company issued 8,124,320 units (the "Units") at a price of C$1.25 per Unit.  Each Unit is comprised of one common share of the Company (a "Common Share") and one half of one transferable common share purchase warrant (a "Warrant"), each Warrant having a three-year life and entitling the holder thereof to acquire one Common Share at a price of C$2.00.

The proceeds from the Offering are being used primarily for lease payments, acquisition payments, exploration and development at the Bunker Hill Mine and for general corporate and working capital purposes.

In connection with the Offering, the Agents received a cash fee in an amount equal to 8.0% of the gross proceeds of the Offering (excluding proceeds from certain president's list subscribers) and were granted common share purchase warrants (the "Broker Warrants") entitling them to subscribe for that number of Common Shares equal to 4.0% of the aggregate number of Units sold in the Offering (excluding Units sold to certain president's list subscribers). Each Broker Warrant is exercisable at a price equal to C$2.00 for thirty-six months following its issuance. The Company issued an aggregate of 278,160 Broker Warrants to the Agents in connection with the Offering. The proceeds from the Offering are being used primarily for lease payments, acquisition payments, exploration and development at the Bunker Hill Mine and for general corporate and working capital purposes.

Current Assets and Total Assets

As of March 31, 2018, the unaudited balance sheet reflects that the Company had: i) total current assets of $2,674,485, compared to total current assets of $822,178 at June 30, 2017, an increase of $1,852,307, or approximately 225%; and ii) total assets of $2,774,956, compared to total assets of $1,131,195 at June 30, 2017, an increase of $1,643,761, or approximately 145%.  The increases resulted from the financing completed in December 2017 (noted above) net of expending cash over the period ended March 31, 2018.

Total Current Liabilities and Total Liabilities

As of March 31, 2018, the unaudited balance sheet reflects that the Company had total current liabilities and total liabilities of $228,435, compared to total current liabilities and total liabilities of $418,333 at June 30, 2017, a decrease of $189,898, or approximately 45%.

In December 2017, the Company recorded a long-term Derivative Liability representing the value of the warrants issued and included in the units associated with the financing completed and described above.  The Company has accounted for the warrant liability in accordance with ASC Topic 815. These warrants are considered derivative instruments as they were issued in a currency other than the Company’s functional currency of the US dollar. The estimated fair value of warrants accounted for as liabilities was determined on the date of issue and marks to market at each financial reporting period. The change in fair value of the warrant is recorded in the condensed consolidated statement of operations and comprehensive loss as a gain or loss and is estimated using the Binomial model.

Cash Flow – for the interim periods ended March 31, 2018 and 2017

During the nine months ended March 31, 2018 cash was primarily used to fund working capital and operations as well as property payments.  The Company reported a net increase in cash of $1,467,700 during the nine months ended March 31, 2018 compared to a net increase in cash of $929,783 during the nine months ended March 31, 2017.  The following provides additional discussion and analysis of cash flow.


For the nine months ended March 31,

2018

$

 

2017

$

 

 

 

 

Net cash used in operating activities

(5,621,089)

 

(539,219)

Net cash provided by investing activities

(95,252)

 

---

Net cash provided by financing activities

7,184,041

 

1,469,002

 

 

 

 

Net Change in Cash

1,467,700

 

929,783



18








Going Concern

These unaudited interim condensed consolidated financial statement filings have been prepared on the going concern basis, which assumes that adequate sources of financing will be obtained as required and that the Company’s assets will be realized, and liabilities settled in due course of business. Accordingly, the interim condensed consolidated unaudited financial statements do not include any adjustments related to the recoverability of assets and classification of assets and liabilities that might be necessary should the Company not be able to continue as a going concern.  The going concern assumption is discussed in the financial statements Note 1 – Basis of Presentation and Going Concern.


OFF BALANCE SHEET ARRANGEMENTS

The Company does not have any off-balance sheet arrangements.

ITEM 3.

QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK.

Not Applicable.

ITEM 4.

CONTROLS AND PROCEDURES.

Disclosure Controls and Procedures

The Securities and Exchange Commission defines the term “disclosure controls and procedures” to mean a company's controls and other procedures of an issuer that are designed to ensure that information required to be disclosed in the reports that it files or submits under the Securities Exchange Act of 1934 is recorded, processed, summarized and reported, within the time periods specified in the Securities and Exchange Commission’s rules and forms.  Disclosure controls and procedures include, without limitation, controls and procedures designed to ensure that information required to be disclosed by an issuer in the reports that it files or submits under the Securities Exchange Act of 1934 is accumulated and communicated to the issuer’s management, including its principal executive and principal financial officers, or persons performing similar functions, as appropriate to allow timely decisions regarding required disclosure.  The Company maintains such a system of controls and procedures in an effort to ensure that all information which it is required to disclose in the reports it files under the Securities Exchange Act of 1934 is recorded, processed, summarized and reported within the time periods specified under the SEC's rules and forms and that information required to be disclosed is accumulated and communicated to principal executive and principal financial officers to allow timely decisions regarding disclosure.

As of the end of the period covered by this report, the Company carried out an evaluation, under the supervision and with the participation of the Chief Executive Officer and Chief Financial Officer, of the effectiveness of the design and operation of the Company’s disclosure controls and procedures.  Based on this evaluation, the Chief Executive Officer and Chief Financial Officer concluded that the disclosure controls and procedures are designed to provide reasonable assurance of achieving the objectives of timely alerting them to material information required to be included in the Company’s periodic SEC reports and of ensuring that such information is recorded, processed, summarized and reported within the time periods specified.  The Company’s Chief Executive Officer and Chief Financial Officer also concluded that the disclosure controls and procedures were effective as of the end of the period covered by this report to provide reasonable assurance of the achievement of these objectives.

Changes in Internal Control over Financial Reporting

There was no change in the Company's internal control over financial reporting during the period ended March 31, 2018, that has materially affected, or is reasonably likely to materially affect, the Company's internal control over financial reporting.



19






PART II - OTHER INFORMATION

ITEM 1.

LEGAL PROCEEDINGS.

The Company is currently a party to litigation, which it initiated against Liberty International Underwriters, Inc., the underwriter of its directors and officer’s liability insurance.  The case is captioned:  Liberty Silver Corp. v. Liberty International Underwriters, Court File No. CV-15-529239 and was filed on May 29, 2015, in the Ontario Superior Court of Justice.   In this legal action, the Company is seeking payment of legal fees incurred in connection with SEC and OSC cease trade orders.  In connection with the substantial legal fees incurred by the Company with various law firms, the Company has entered into an assignment agreement (the “Assignment Agreement”) with the various law firms that are owed these fees.  Pursuant to the Assignment Agreement, the Company has irrevocably assigned the net proceeds of the Company’s action against the insurance underwriter to each of the law firms that are owed fees in connection with the SEC and OSC cease trade orders.  Each of the law firms have agreed, pursuant to the terms of the Assignment Agreement, to fully and finally release the Company from any and all claims, demands and causes of action, in respect of the accounts rendered by the law firms.  

Neither the Company nor its property is the subject of any other pending legal proceedings, and no other such proceeding is known to be contemplated by any governmental authority.  The Company is not aware of any other legal proceedings in which any director, officer or affiliate of the Company, any owner of record or beneficially of more than 5% of any class of the Company’s voting securities, or any associate of any such director, officer, affiliate or security holder of the Company, is a party adverse to the Company or any of its subsidiaries or has a material interest adverse to the Company or any of its subsidiaries.


ITEM 1A.

 RISK FACTORS.

Not Applicable.


ITEM 2.

UNREGISTERED SALES OF EQUITY SECURITIES AND USE OF PROCEEDS.

Not Applicable.


ITEM 3.

DEFAULTS UPON SENIOR SECURITIES.

None.


ITEM 4.

MINE SAFETY DISCLOSURES.

The enacted Dodd-Frank Wall Street Reform and Consumer Protection Act (“the Act”) requires the operators of mines to include in each periodic report filed with the Securities and Exchange Commission certain specified disclosures regarding the Company’s history of mine safety.  The Company currently does not operate any mines and, as such, is not subject to disclosure requirements regarding mine safety that were imposed by the Act.


ITEM 5.

OTHER INFORMATION.

Not Applicable.



20





ITEM 6.

EXHIBITS.

(a)

The following exhibits are filed herewith:


31.1

Certifications pursuant to Rule 13a-14(a) or 15d-14(a) under the Securities Exchange Act of 1934, as amended, as adopted pursuant to Section 302 of the Sarbanes-Oxley Act of 2002.

31.2

Certifications pursuant to Rule 13a-14(a) or 15d-14(a) under the Securities Exchange Act of 1934, as amended, as adopted pursuant to Section 302 of the Sarbanes-Oxley Act of 2002.

32.1

Certifications pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002.

32.2

Certifications pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002.

101.

SCH XBRL Schema Document.

101

INS XBRL Instance Document.

101.

CAL XBRL Taxonomy Extension Calculation Linkbase Document.

101.

LAB XBRL Taxonomy Extension Label Linkbase Document.

101.

PRE XBRL Taxonomy Extension Presentation Linkbase Document.

101.

DEF XBRL Taxonomy Extension Definition Linkbase Document.



SIGNATURES


Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned thereunto duly authorized.


By: /s/    Bruce Reid

 Bruce Reid, President and Chief Executive Officer


Date:  May 15, 2018


By: /s/    Julio DiGirolamo

 Julio DiGirolamo, Chief Financial Officer


Date:  May 15, 2018






21


EX-31 2 ceo1-exh311.htm CERTIFICATION exh311

Exhibit 31.1


CERTIFICATION


I, Bruce Reid, certify that:

1.         I have reviewed this quarterly report on Form 10-Q of Bunker Hill Mining Corp.;

2.         Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this report;

3.         Based on my knowledge, the financial statements, and other financial information included in this report, fairly present in all material respects the financial condition, results of operations and cash flows of the registrant as of, and for, the periods presented in this report;

4.         The registrant's other certifying officer(s) and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in Exchange Act Rules 13a+15(e) and 15d+15(e)) and internal control over financial reporting (as defined in Exchange Act Rules 13a+15(f) and 15d+15(f)) for the registrant and have:

(a) designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision, to ensure that material information relating to the registrant, including its consolidated subsidiaries, is made known to us by others within those entities, particularly during the period in which this report is being prepared;

(b) designed such internal control over financial reporting, or caused such internal control over financial reporting to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles;

(c) evaluated the effectiveness of the registrant's disclosure controls and procedures and presented in this report our conclusions about the effectiveness of the disclosure controls and procedures, as of the end of the period covered by this report based on such evaluation; and

(d) disclosed in this report any change in the registrant's internal control over financial reporting that occurred during the registrant's most recent fiscal quarter (the registrant's fourth fiscal quarter in the case of an annual report) that has materially affected, or is reasonably likely to materially affect, the registrant's internal control over financial reporting; and

5.         The registrant's other certifying officer(s) and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the registrant's auditors and the audit committee of registrant's board of directors (or persons performing the equivalent functions):

(a) all significant deficiencies and material weaknesses in the design or operation of internal control over financial reporting which are reasonably likely to adversely affect the registrant's ability to record, process, summarize and report financial information; and

(b) any fraud, whether or not material, that involves management or other employees who have a significant role in the registrant's internal control over financial reporting.

 

 

Date: May 15, 2018

/s/ Bruce Reid

Chief Executive Officer




EX-31 3 cfo1-exh312.htm CERTIFICATION exh312


Exhibit 31.2

CERTIFICATION


I, Julio DiGirolamo, certify that:

1.         I have reviewed this quarterly report on Form 10-Q of Bunker Hill Mining Corp.;

2.         Based on my knowledge, this report does not contain any untrue statement of a material fact or omit to state a material fact necessary to make the statements made, in light of the circumstances under which such statements were made, not misleading with respect to the period covered by this report;

3.         Based on my knowledge, the financial statements, and other financial information included in this report, fairly present in all material respects the financial condition, results of operations and cash flows of the registrant as of, and for, the periods presented in this report;

4.         The registrant's other certifying officer(s) and I are responsible for establishing and maintaining disclosure controls and procedures (as defined in Exchange Act Rules 13a+15(e) and 15d+15(e)) and internal control over financial reporting (as defined in Exchange Act Rules 13a+15(f) and 15d+15(f)) for the registrant and have:

(a) designed such disclosure controls and procedures, or caused such disclosure controls and procedures to be designed under our supervision, to ensure that material information relating to the registrant, including its consolidated subsidiaries, is made known to us by others within those entities, particularly during the period in which this report is being prepared;

(b) designed such internal control over financial reporting, or caused such internal control over financial reporting to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles;

(c) evaluated the effectiveness of the registrant's disclosure controls and procedures and presented in this report our conclusions about the effectiveness of the disclosure controls and procedures, as of the end of the period covered by this report based on such evaluation; and

(d) disclosed in this report any change in the registrant's internal control over financial reporting that occurred during the registrant's most recent fiscal quarter (the registrant's fourth fiscal quarter in the case of an annual report) that has materially affected, or is reasonably likely to materially affect, the registrant's internal control over financial reporting; and

5.         The registrant's other certifying officer(s) and I have disclosed, based on our most recent evaluation of internal control over financial reporting, to the registrant's auditors and the audit committee of registrant's board of directors (or persons performing the equivalent functions):

(a) all significant deficiencies and material weaknesses in the design or operation of internal control over financial reporting which are reasonably likely to adversely affect the registrant's ability to record, process, summarize and report financial information; and

(b) any fraud, whether or not material, that involves management or other employees who have a significant role in the registrant's internal control over financial reporting.

 

 

Date: May 15, 2018

/s/ Julio DiGirolamo

Chief Financial Officer




EX-32 4 ceo2-exh321.htm CERTIFICATION exh321

Exhibit 32.1


Certification of the Principal Executive Officer

Pursuant to 18 U.S.C. Section 1350,

As Adopted Pursuant to Section 906 of the Sarbanes-Oxley Act of 2002



In connection with the quarterly report of Bunker Hill Mining Corp. (the “Company”) on Form 10-Q for the interim period ended March 31, 2018, as filed with the Securities and Exchange Commission on the date hereof (the “Report”), Bruce Reid, the Chief Executive Officer of the Company, hereby certifies, pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002, that:


(1) The Report fully complies with the requirements of Section 13(a) or 15(d) of the Securities Exchange Act of 1934; and

(2) The information contained in the Report fairly presents, in all material respects, the financial condition and results of operations of the Company.


/s/ Bruce Reid
Chief Executive Officer

Date: May 15, 2018



EX-32 5 cfo2-exh322.htm CERTIFICATION exh322


Exhibit 32.2



Certification of the Principal Accounting Officer

Pursuant to 18 U.S.C. Section 1350,

As Adopted Pursuant to Section 906 of the Sarbanes-Oxley Act of 2002



In connection with the quarterly report of Bunker Hill Mining Corp. (the “Company”) on Form 10-Q for the interim period ended March 31, 2018, as filed with the Securities and Exchange Commission on the date hereof (the “Report”), Julio DiGirolamo, the Chief Financial Officer of the Company, hereby certifies, pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002, that:

(1) The Report fully complies with the requirements of Section 13(a) or 15(d) of the Securities Exchange Act of 1934; and

(2) The information contained in the Report fairly presents, in all material respects, the financial condition and results of operations of the Company.


/s/ Julio DiGirolamo
Chief Financial Officer


Date: May 15, 2018




EX-101.INS 6 bhll-20180331.xml 0.001 10000000 0 0 0 0 0.001 300000000 33013715 24889395 33013715 24889395 0 0 0 0 709806 33484 1764860 110792 674554 36368 2849446 66561 91309 275148 351947 356882 142383 58500 527538 83500 1618052 403500 5493791 617735 1618052 403500 5493791 617735 27794 476943 7202 3749 39596 4398 -1362 -77512 34996 2387 516539 -73114 -1583056 -401113 -4977252 -690849 -1583056 -401113 -0.05 -0.02 -0.18 -0.05 33013715 19494149 28330058 14682076 56159 5474 122769 68582 87980 22056 346362 132551 2674485 822178 58610 9016 41860 1 300001 100471 309017 2774956 1131195 65108 261925 130746 156408 32581 228435 418333 2776218 3004653 418333 0 0 33013 24889 23158244 19131675 -18443702 -229697 712862 2774956 1131195 -4977252 -690849 103815 1381 3796 300000 -476943 -50685 -54187 -65924 8260 -213811 -10625 -196817 127816 -25662 -52714 32581 77512 -5621089 -539219 -53392 -41860 -95252 100000 7937538 1132917 -753497 236085 7184041 1469002 1467700 929783 593515 9361 2061215 939144 285810 1400000 10-Q 2018-03-31 false Bunker Hill Mining Corp. 0001407583 bhll --06-30 33013715 Smaller Reporting Company Yes No No 2018 Q3 <!--egx--><p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify;text-autospace:ideograph-numeric ideograph-other'><b>Note 1 &#150; Basis of Presentation and Going Concern</b></p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify;text-autospace:ideograph-numeric ideograph-other'>&nbsp;</p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify;text-autospace:ideograph-numeric ideograph-other'>The accompanying unaudited interim condensed consolidated financial statements have been prepared in accordance with accounting principles generally accepted in the United States of America and the rules and regulations of the United States Securities and Exchange Commission for interim financial information. Accordingly, they do not include all the information and footnotes necessary for a comprehensive presentation of financial position, results of operations, shareholders&#146; equity or cash flows. It is management's opinion, however, that all material adjustments (consisting of normal recurring adjustments) have been made which are necessary for a fair financial statement presentation. The unaudited interim condensed consolidated financial statements should be read in conjunction with the Company&#146;s Annual Report on Form 10-K, which contains the annual audited consolidated financial statements and notes thereto, together with the Management&#146;s Discussion and Analysis, for the year ended June 30, 2017. The interim results for the period ended March 31, 2018 are not necessarily indicative of the results for the full fiscal year. The interim unaudited condensed consolidated financial statements are presented in USD, which is the functional currency.</p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify;text-autospace:ideograph-numeric ideograph-other'>&nbsp;</p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify;text-autospace:ideograph-numeric ideograph-other'>These unaudited interim condensed consolidated financial statements have been prepared on a going concern basis. The Company has incurred losses since inception resulting in an accumulated deficit of $23,420,954 and further losses are anticipated in the development of its business. The ability of the Company to emerge from the exploration stage is dependent upon, among other things, obtaining additional financing to continue operations, exploration and development of the mineral properties and the discovery of, development, and sale of reserves. In order to continue to meet its plans and fiscal obligations in the current fiscal year and beyond, the Company must seek additional financing. Its ability to continue as a going concern is dependent upon the ability of the Company to generate profitable operations in the future and/or to obtain the necessary financing to meet its obligations and repay its liabilities arising from normal business operations when they come due. The accompanying unaudited interim condensed consolidated financial statements do not include any adjustments that might result from the outcome of this uncertainty.</p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify;text-autospace:ideograph-numeric ideograph-other'>&nbsp;</p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify;text-autospace:ideograph-numeric ideograph-other'>Management is considering various financing alternatives including, but not limited to, raising capital through the capital markets and debt financing.&#160; These interim condensed consolidated financial statements do not include any adjustments relating to the recoverability and classification of recorded assets, or the amounts of and classification of liabilities that might be necessary in the event the Company cannot continue in existence.&#160; The ability of the Company to emerge from the exploration stage is dependent upon, among other things, obtaining additional financing to continue operations, explore and develop the mineral properties and the discovery, development, and sale of reserves.&#160; These factors, among others, raise substantial doubt about the Company&#146;s ability to continue as a going concern.</p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify;text-autospace:ideograph-numeric ideograph-other'>&nbsp;</p> <!--egx--><p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify'><b>Note 2 &#150; Nature of Operations </b></p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify'>&nbsp;</p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify'>Bunker Hill Mining Corp. (formerly Liberty Silver Corp.) (the &#147;Company&#148; or &#147;Bunker&#148;) was incorporated under the laws of the state of Nevada, U.S.A on February 20, 2007 under the name Lincoln Mining Corp.&#160; Pursuant to a Certificate of Amendment dated February 11, 2010, the Company changed its name to Liberty Silver Corp., and on September 29, 2017 the Company changed its name to Bunker Hill Mining Corp.&#160; The Company&#146;s registered office is located at 1802 N. Carson Street, Suite 212, Carson City Nevada 89701, and its head office is located at 401 Bay Street, Suite 2702, Toronto, Ontario, Canada, M5H 2Y4, and its telephone number is 888-749-4916.&#160; As of the date of this Form 10-Q, the Company had two subsidiaries, Bunker Hill Operating LLC, a Colorado corporation that is currently dormant, and American Zinc. Corp., an Idaho corporation created to facilitate the work being conducted at the Bunker Hill Mine in Idaho.</p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify'>&nbsp;</p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify'>The Company was incorporated for the purpose of engaging in mineral exploration activities.&#160; It continues to work at developing its projects with a view towards putting them into production.</p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify'>&nbsp;</p> <!--egx--><p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify'><b>Note 3 - </b><b>Mining Interests</b></p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify;text-autospace:ideograph-numeric ideograph-other'>&nbsp;</p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify;text-autospace:ideograph-numeric ideograph-other'><u>Bunker Hill Mine Complex</u></p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify'>&nbsp;</p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify'>On November 27, 2016, the Company entered into a non-binding letter of intent with Placer Mining Corp.<font lang="EN-CA"> (&#147;Placer Mining&#148;)</font>, which letter of intent was further amended on March 29, 2017, to acquire the Bunker Hill Mine located in Kellogg, Idaho, in the Coeur d&#146;Alene Basin (the &#147;Letter of Intent&#148;).&#160; Pursuant to the terms and conditions of the Letter of Intent, the acquisition, which was subject to due diligence, would include mining claims, surface rights, fee parcels, mineral interests, existing infrastructure, machinery and buildings at the Kellogg Tunnel portal in Milo Gulch, or anywhere underground at the Bunker Hill Mine Complex, but specifically excluding certain areas of the mine and property.&#160; The acquisition would also include all current and historic data relating to the Bunker Hill Mine Complex, such as drill logs, reports, maps, and similar information located at the mine site or any other location. </p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify'>&nbsp;</p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify'>The Company made certain payments totaling $300,000 as part of this Letter of Intent.&#160; During the quarter ended September 30, 2017, additional payments totaling $200,000 were made to extend the negotiation period.&#160; <font lang="EN-CA">On August 28, 2017, </font><font lang="EN-CA">the Company announced that it signed a definitive agreement (the &#147;Agreement&#148;) for the lease and option to purchase the Bunker Hill Mine assets (the &#147;Bunker Assets&#148;) (see note 5). All payments related to the lease are being expensed until the option is exercised and the $</font><font lang="EN-CA">500,000</font><font lang="EN-CA"> previously capitalized has been expensed in the quarter ended December 31, 2017.&#160; During the quarter ended March 31, 2018, the $</font><font lang="EN-CA">300,000</font><font lang="EN-CA"> of lease payments have been expensed.</font></p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify'>&nbsp;</p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify'><font lang="EN-CA">In November 2017, the Company negotiated an extension to the commencement of the lease to afford it time to complete an equity financing (see note 5).</font></p> <p style='margin:0in;margin-bottom:.0001pt;text-align:justify'>&nbsp;</p> <p style='margin:0in;margin-bottom:.0001pt;text-align:justify'><u>Trinity Project</u></p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify;text-autospace:ideograph-numeric ideograph-other'>&nbsp;</p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify;text-autospace:ideograph-numeric ideograph-other'>On August 31, 2017, the Company and Renaissance Exploration Inc. signed a notice of termination and release of exploration Earn-In Agreement.&#160; Upon signing this agreement, the Company has terminated the March 29, 2010 Earn-In Agreement.&#160; </p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify'>&nbsp;</p> <!--egx--><p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify'><b>Note 4 &#150; Capital Stock and Warrants</b></p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify'>&nbsp;</p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify'><b>Authorized</b></p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify'>&nbsp;</p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;margin-left:40.5pt;text-align:justify'>The total authorized capital is as follows:</p> <p style='margin-top:0in;margin-right:0in;margin-bottom:0in;margin-left:.5in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;margin-left:1.0in;text-align:justify;text-indent:-.25in'>-&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 300,000,000 common shares with a par value of $0.001 per common share; and</p> <p style='margin-top:0in;margin-right:0in;margin-bottom:0in;margin-left:.5in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;margin-top:0in;margin-right:0in;margin-bottom:6.0pt;margin-left:1.0in;text-align:justify;text-indent:-.25in'>-&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 10,000,000 preferred shares with a par value of $0.001 per preferred share </p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify'><b>Issued and outstanding</b></p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify;text-autospace:ideograph-numeric ideograph-other'>&nbsp;</p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify;text-autospace:ideograph-numeric ideograph-other'>In December 2017, Bunker announced that it closed a private placement led by Red Cloud Klondike Strike Inc. and including Haywood Securities Inc. (collectively, the &#147;Agents&#148;) to raise gross proceeds of CDN$10,155,400 (the &#147;Offering&#148;). Pursuant to the Offering, the Company issued 8,124,320 units (the &quot;Units&quot;) at a price of CDN$1.25 per Unit.&#160; Each Unit was comprised of one common share of the Company (a &quot;Common Share&quot;) and one half of one transferable common share purchase warrant (a &quot;Warrant&quot;), each Warrant having a three-year life and entitling the holder thereof to acquire one Common Share at a price of CDN$2.00. </p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify;text-autospace:ideograph-numeric ideograph-other'>&nbsp;</p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify;text-autospace:ideograph-numeric ideograph-other'>The Company has accounted for the warrant liability in accordance with ASC Topic 815. These warrants are considered derivative instruments as they were issued in a currency other than the Company&#146;s functional currency of the US dollar. The estimated fair value of warrants accounted for as liabilities was determined on the date of issue and marks to market at each financial reporting period. The change in fair value of the warrant liability is recorded in the interim condensed consolidated statement of operations and comprehensive loss as a gain or loss and is estimated using the Binomial model.</p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify;text-autospace:ideograph-numeric ideograph-other'>&nbsp;</p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify;text-autospace:ideograph-numeric ideograph-other'>The proceeds from the Offering are being used primarily for lease payments, acquisition payments, exploration and development at the Bunker Hill Mine and for general corporate and working capital purposes. </p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify;text-autospace:ideograph-numeric ideograph-other'>&nbsp;</p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify;text-autospace:ideograph-numeric ideograph-other'>In connection with the Offering, the Agents received a cash fee in an amount equal to 8.0% of the gross proceeds of the Offering (excluding proceeds from certain president's list subscribers) and were granted common share purchase warrants (the &quot;Broker Warrants&quot;) entitling them to subscribe for that number of Common Shares equal to 4.0% of the aggregate number of Units sold in the Offering (excluding Units sold to certain president's list subscribers). Each Broker Warrant is exercisable at a price equal to CDN$2.00 for thirty-six months following its issuance. The Company issued an aggregate of 278,160 Broker Warrants to the Agents in connection with the Offering. </p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify;text-autospace:ideograph-numeric ideograph-other'>&nbsp;</p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify;text-autospace:ideograph-numeric ideograph-other'>At March 31, 2018 there were 33,013,715 common shares issued and outstanding.</p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify'>&nbsp;</p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify'><b><u>Warrants</u></b></p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;margin-right:-.7pt;text-align:justify;text-autospace:ideograph-numeric ideograph-other'>&nbsp;</p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;margin-right:-.7pt;text-align:justify;text-autospace:ideograph-numeric ideograph-other'>As of March 31, 2018, the Company had 4,340,320 warrants outstanding, all issued pursuant to the equity financing completed in December 2017 and described above.</p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-autospace:ideograph-numeric ideograph-other'>&nbsp;</p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-autospace:ideograph-numeric ideograph-other'><b><u>Stock Options</u></b></p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify;text-autospace:ideograph-numeric ideograph-other'>&nbsp;</p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify;text-autospace:ideograph-numeric ideograph-other'>In December 2017, 100,000 options were granted to a consultant with a five-year life and an exercise price of CDN$1.65.&#160; these options vested immediately and, using the Black Scholes option pricing method, had a value of CDN$103,815, which value is expensed on as stock based compensation on the statement of operations.&#160; As at March 31, 2018, there were 2,391,000 stock options outstanding, exercisable at a weighted average exercise price of CDN$1.01 per share.&#160; Of this total, 56,000 have an exercise price of $0.1875 and expire on February 17, 2020, 2,235,000 have an exercise price of CDN$1.00 and expire May 2, 2022 and 100,000 have an exercise price of CDN$1.65 and expire December 13, 2022.</p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric'>&nbsp;</p> <!--egx--><p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric'><b>Note 5 &#150; Commitments and Contingencies</b></p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;margin-right:-.7pt;text-align:justify'>&nbsp;</p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;margin-right:-.7pt;text-align:justify'>Effective June 1, 2017, the Company has a lease agreement for office space at 401 Bay Street, Suite 2702, Toronto, Ontario, Canada, M5H 2Y4.&#160; The 5-year lease provides for a monthly base rent of CDN$12,964 for the first two years, increasing to CDN$13,504 per month for years three through five.&#160; The Company has signed sub-leases with other companies that cover 78% of the monthly lease amount.</p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify'>&nbsp;</p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify'><font lang="EN-CA">Pursuant to its </font><font lang="EN-CA">Agreement for the lease and option to purchase the Bunker Assets, the Company made two $500,000 bonus payments to Placer Mining.&#160; The 24-month lease was to commence November 1, 2017 but was deferred to December 1, 2017 and continues until October 31, 2019.&#160;&#160; The lease period can be extended by a further 12 months at the Company&#146;s discretion.&#160; During the term of the lease, the Company must make $100,000 monthly mining lease payments, paid quarterly.</font></p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify;background:white;text-autospace:ideograph-numeric ideograph-other'>&nbsp;</p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify;background:white;text-autospace:ideograph-numeric ideograph-other'><font lang="EN-CA">The Company has an option to purchase the Bunker Assets at any time before the end of the lease and any extension for a purchase price of $25 million with purchase payments to be made over a ten-year period. Under terms of the agreement, there is a 3% net smelter return royalty (&#147;NSR&#148;) on sales during the Lease and a 1.5% NSR on the sales after the purchase option is exercised, which post-acquisition NSR is capped at $60 million.</font></p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify;background:white;text-autospace:ideograph-numeric ideograph-other'>&nbsp;</p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify;background:white;text-autospace:ideograph-numeric ideograph-other'><font lang="EN-CA">In addition to the payments to Placer Mining, pursuant to an agreement with the United States Environmental Protection Agency (&#147;EPA&#148;) whereby for so long as Bunker leases, owns and/or occupies the Bunker Hill Mine, the Company will make payments to the EPA on behalf of the current owner in satisfaction of the EPA&#146;s claim for cost recovery.&#160; Payments to the EPA will start with $1 million 30 days after a fully ratified agreement is signed followed by $2 million on November 1, 2018 and $3 million on each of the next 5 anniversaries with a final $2 million payment on November 1, 2024.</font></p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify;background:white;text-autospace:ideograph-numeric ideograph-other'>&nbsp;</p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;margin-bottom:6.0pt;text-align:justify;background:white;text-autospace:ideograph-other'><font lang="EN-CA">In addition to the above payments, the EPA will also be paid $480,000 within 30 days after a fully ratified agreement is signed with the EPA and every six months thereafter for as long as Bunker leases, owns, and/or occupies the mine.&#160; These payments are for estimated ongoing water treatment costs which the Company agreed to begin payment upon commencement of the mine lease. </font></p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify;background:white;text-autospace:ideograph-numeric ideograph-other'>&nbsp;</p> <!--egx--><p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;margin-right:-.7pt'><b>Note 6 &#150; Related Party Transactions</b></p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify'>&nbsp;</p> <p style='margin:0in;margin-bottom:.0001pt;text-autospace:ideograph-numeric;text-align:justify'>Through November 30, 2017, each of Messrs. Bruce Reid (CEO), Julio DiGirolamo (CFO), Howard Crosby (Executive Vice President) and John Ryan (Director) received $5,000 per month for services to the Company.&#160; Payments to Messrs., Crosby and Ryan continued at this rate through March 31, 2018.&#160; Commencing December 1, 2017, commensurate with the increased activities in the Company, Messrs. Reid and DiGirolamo&#146;s pay increased to $20,000 and $15,000 per month, respectively.&#160; In early December 2017, the Board approved and ratified compensation to Mr. Reid for unaccrued and unpaid salary and bonus, including for risk-capital sums advanced by Mr. Reid to the Company in order that the Company could complete many of its obligations and initiatives during 2017.&nbsp; The payment, totaling $500,000 was accrued at December 31, 2017 and was paid in January 2018.</p> <p style='margin-bottom:6.0pt;text-align:justify'>&nbsp;</p> These unaudited interim condensed consolidated financial statements have been prepared on a going concern basis. The Company has incurred losses since inception resulting in an accumulated deficit of $23,420,954 and further losses are anticipated in the development of its business. The ability of the Company to emerge from the exploration stage is dependent upon, among other things, obtaining additional financing to continue operations, exploration and development of the mineral properties and the discovery of, development, and sale of reserves. In order to continue to meet its plans and fiscal obligations in the current fiscal year and beyond, the Company must seek additional financing. Its ability to continue as a going concern is dependent upon the ability of the Company to generate profitable operations in the future and/or to obtain the necessary financing to meet its obligations and repay its liabilities arising from normal business operations when they come due. The accompanying unaudited interim condensed consolidated financial statements do not include any adjustments that might result from the outcome of this uncertainty. -23420954 Management is considering various financing alternatives including, but not limited to, raising capital through the capital markets and debt financing. Nevada 2007-02-20 Liberty Silver Corp 2017-09-29 1802 N. Carson Street, Suite 212 Carson City Nevada 89701 888 749-4916 As of the date of this Form 10-Q, the Company had two subsidiaries, Bunker Hill Operating LLC, a Colorado corporation that is currently dormant, and American Zinc. Corp., an Idaho corporation created to facilitate the work being conducted at the Bunker Hill Mine in Idaho. Bunker Hill Mine Complex On November 27, 2016, the Company entered into a non-binding letter of intent with Placer Mining Corp. (&#147;Placer Mining&#148;), which letter of intent was further amended on March 29, 2017, to acquire the Bunker Hill Mine located in Kellogg, Idaho, in the Coeur d&#146;Alene Basin (the &#147;Letter of Intent&#148;). Pursuant to the terms and conditions of the Letter of Intent, the acquisition, which was subject to due diligence, would include mining claims, surface rights, fee parcels, mineral interests, existing infrastructure, machinery and buildings at the Kellogg Tunnel portal in Milo Gulch, or anywhere underground at the Bunker Hill Mine Complex, but specifically excluding certain areas of the mine and property. The acquisition would also include all current and historic data relating to the Bunker Hill Mine Complex, such as drill logs, reports, maps, and similar information located at the mine site or any other location. The Company made certain payments totaling $300,000 as part of this Letter of Intent. During the quarter ended September 30, 2017, additional payments totaling $200,000 were made to extend the negotiation period. On August 28, 2017, the Company announced that it signed a definitive agreement (the &#147;Agreement&#148;) for the lease and option to purchase the Bunker Hill Mine assets (the &#147;Bunker Assets&#148;) (see note 5). All payments related to the lease are being expensed until the option is exercised and the $500,000 previously capitalized has been expensed in the quarter ended December 31, 2017. During the quarter ended March 31, 2018, the $300,000 of lease payments have been expensed. In November 2017, the Company negotiated an extension to the commencement of the lease to afford it time to complete an equity financing (see note 5). 300000 200000 500000 300000 Trinity Project On August 31, 2017, the Company and Renaissance Exploration Inc. signed a notice of termination and release of exploration Earn-In Agreement. Upon signing this agreement, the Company has terminated the March 29, 2010 Earn-In Agreement. 300000000 0.001 10000000 0.001 10155400 8124320 1.25 278160 33013715 4340320 100000 1.65 103815 2391000 1.01 56000 0.1875 2235000 1.00 100000 1.65 Effective June 1, 2017, the Company has a lease agreement for office space at 401 Bay Street, Suite 2702, Toronto, Ontario, Canada, M5H 2Y4. The 5-year lease provides for a monthly base rent of CDN$12,964 for the first two years, increasing to CDN$13,504 per month for years three through five. The Company has signed sub-leases with other companies that cover 78% of the monthly lease amount. Pursuant to its Agreement for the lease and option to purchase the Bunker Assets, the Company made two $500,000 bonus payments to Placer Mining. The 24-month lease was to commence November 1, 2017 but was deferred to December 1, 2017 and continues until October 31, 2019. The lease period can be extended by a further 12 months at the Company&#146;s discretion. During the term of the lease, the Company must make $100,000 monthly mining lease payments, paid quarterly. The Company has an option to purchase the Bunker Assets at any time before the end of the lease and any extension for a purchase price of $25 million with purchase payments to be made over a ten-year period. Under terms of the agreement, there is a 3% net smelter return royalty (&#147;NSR&#148;) on sales during the Lease and a 1.5% NSR on the sales after the purchase option is exercised, which post-acquisition NSR is capped at $60 million. In addition to the payments to Placer Mining, pursuant to an agreement with the United States Environmental Protection Agency (&#147;EPA&#148;) whereby for so long as Bunker leases, owns and/or occupies the Bunker Hill Mine, the Company will make payments to the EPA on behalf of the current owner in satisfaction of the EPA&#146;s claim for cost recovery. Payments to the EPA will start with $1 million 30 days after a fully ratified agreement is signed followed by $2 million on November 1, 2018 and $3 million on each of the next 5 anniversaries with a final $2 million payment on November 1, 2024. In addition to the above payments, the EPA will also be paid $480,000 within 30 days after a fully ratified agreement is signed with the EPA and every six months thereafter for as long as Bunker leases, owns, and/or occupies the mine. These payments are for estimated ongoing water treatment costs which the Company agreed to begin payment upon commencement of the mine lease. 5000 5000 5000 5000 5000 5000 20000 15000 500000 0001407583 2018-05-28 0001407583 fil:PrivatePlacement1Member 2017-10-01 2017-12-31 0001407583 2018-03-31 0001407583 2017-10-01 2017-12-31 0001407583 2017-12-31 0001407583 fil:February172020Member 2018-03-31 0001407583 fil:May22022Member 2018-03-31 0001407583 fil:December132022Member 2017-10-01 2017-12-31 0001407583 2017-06-30 0001407583 2018-01-01 2018-03-31 0001407583 2017-01-01 2017-03-31 0001407583 2017-07-01 2018-03-31 0001407583 2016-07-01 2017-03-31 0001407583 2016-06-30 0001407583 2017-03-31 0001407583 fil:BunkerHillMember 2017-01-01 2017-03-31 0001407583 fil:BunkerHillMember 2017-10-01 2017-12-31 0001407583 fil:ReidMember 2017-07-01 2017-11-30 0001407583 fil:DigirolamoMember 2017-07-01 2017-11-30 0001407583 fil:CrosbyMember 2017-07-01 2017-11-30 0001407583 fil:RyanMember 2017-07-01 2017-11-30 0001407583 fil:CrosbyMember 2017-12-01 2018-03-31 0001407583 fil:RyanMember 2017-12-01 2018-03-31 0001407583 fil:ReidMember 2017-12-01 2018-03-31 0001407583 fil:ReidMember 2017-12-31 0001407583 fil:BunkerHillMember 2017-07-01 2018-03-31 0001407583 fil:TrinityMember 2017-07-01 2018-03-31 0001407583 fil:OfficeLeaseMember 2017-07-01 2018-03-31 0001407583 fil:LeaseAndOptionToPurchaseMember 2017-07-01 2018-03-31 0001407583 fil:EpaMember 2017-07-01 2018-03-31 0001407583 fil:DigirolamoMember 2017-12-01 2018-03-31 iso4217:USD xbrli:shares iso4217:USD xbrli:shares iso4217:CAD iso4217:CAD shares Note 3 Note 4 Going concern (note 1), Commitments and contingencies (note 5) Note 6 EX-101.SCH 7 bhll-20180331.xsd 000130 - Disclosure - Note 2 - Nature of Operations (Details) link:presentationLink link:definitionLink link:calculationLink 000160 - Disclosure - Note 5 - Commitments and Contingencies (Details) link:presentationLink link:definitionLink link:calculationLink 000150 - Disclosure - Note 4 - Capital Stock and Warrants (Details) link:presentationLink link:definitionLink link:calculationLink 000100 - Disclosure - Note 5 - Commitments and Contingencies link:presentationLink link:definitionLink link:calculationLink 000170 - Disclosure - Note 6 - Related Party Transactions (Details) link:presentationLink link:definitionLink link:calculationLink 000060 - Disclosure - Note 1 - Basis of Presentation and Going Concern link:presentationLink link:definitionLink link:calculationLink 000140 - Disclosure - Note 3 - Mining Interests (Details) link:presentationLink link:definitionLink link:calculationLink 000020 - Statement - Bunker Hill Mining Corp. (Formerly Liberty Silver Corp.) Interim Condensed Consolidated Balance Sheets (Unaudited) link:presentationLink link:definitionLink link:calculationLink 000030 - Statement - Statement of Financial Position - Parenthetical link:presentationLink link:definitionLink link:calculationLink 000120 - Disclosure - Note 1 - Basis of Presentation and Going Concern (Details) link:presentationLink link:definitionLink link:calculationLink 000040 - Statement - Bunker Hill Mining Corp. (Formerly Liberty Silver Corp.) Interim Condensed Consolidated Statements of Operations and Comprehensive Loss (Unaudited) link:presentationLink link:definitionLink link:calculationLink 000010 - Document - Document and Entity Information link:presentationLink link:definitionLink link:calculationLink 000110 - Disclosure - Note 6 - Related Party Transactions link:presentationLink link:definitionLink link:calculationLink 000050 - Statement - Bunker Hill Mining Corp. (Formerly Liberty Silver Corp.) Interim Condensed Consolidated Statements of Cash Flows (Unaudited) link:presentationLink link:definitionLink link:calculationLink 000080 - Disclosure - Note 3 - Mining Interests link:presentationLink link:definitionLink link:calculationLink 000090 - Disclosure - Note 4 - Capital Stock and Warrants link:presentationLink link:definitionLink link:calculationLink 000070 - Disclosure - Note 2 - Nature of Operations link:presentationLink link:definitionLink link:calculationLink EX-101.CAL 8 bhll-20180331_cal.xml EX-101.DEF 9 bhll-20180331_def.xml EX-101.LAB 10 bhll-20180331_lab.xml Reid Equity Method Investment, Description of Principal Activities Common stock issued to settle convertible loan payable Common stock issued to settle accrued interest payable Increase in cash and cash equivalents (Increase) decrease in prepaid expenses Loss before income tax Gain on foreign exchange Common shares, $0.001 par value, 300,000,000 common shares authorized; 33,013,715 and 24,889,395 common shares issued and outstanding, respectively Entity Address, State or Province Amendment Flag February 17, 2020 Statement [Line Items] Cash flows from financing activities: Legal and accounting Revenue Preferred Stock, Shares Outstanding Total liabilities Total liabilities Derivative liability Total current assets Total current assets Entity Information, Former Legal or Registered Name Entity Filer Category Document and Entity Information: Private placement units issued Private placement units issued Other Ownership Interests, Name Common stock issued to settle accrued interest payable Common stock issued to settle accrued interest payable Net cash used in operating activities Operation and administration Deficit accumulated during the exploration stage Deficit accumulated during the exploration stage SHAREHOLDERS' EQUITY Accounts payable ASSETS Entity Address, Postal Zip Code Document Fiscal Year Focus Entity Common Stock, Shares Outstanding EPA Warrants and Rights Outstanding Notes Net cash used in investing activities Net loss and comprehensive loss Net loss and comprehensive loss Provision for income taxes Interest expense Common Stock, Shares Outstanding Cash and cash equivalents Cash and cash equivalents, beginning of period Cash and cash equivalents, end of period Entity Incorporation, Date of Incorporation Entity Well-known Seasoned Issuer Related Party Transaction [Axis] Options granted to consultant price per share Options granted to consultant price per share Options granted to consultant price per share Trinity Note 1 - Basis of Presentation and Going Concern Share issue costs Increase (decrease) in accounts payable Loss per common share - basic and fully diluted Entity Address, Address Line One DiGirolamo Related Party Transaction Net cash from financing activities Preferred Stock, Par Value Preferred Stock, Par Value Total current liabilities Total current liabilities Prepaid expenses Trading Symbol Office lease Shares outstanding Shares outstanding May 2, 2022 Note 3 - Mining Interests Increase in accrued liabilities Adjustments to reconcile net loss to net cash used in operating activities: Preferred Stock, Shares Authorized Preferred Stock, Shares Authorized Total shareholders' equity Total shareholders' equity Preferred shares, $0.001 par value, 10,000,000 preferred shares authorized; Nil preferred shares issued and outstanding Accounts receivable Entity Public Float Contingent Consideration Type Private placement price per unit Private placement price per unit Note 6 - Related Party Transactions Proceeds from issuance of common stock Increase in other liabilities Increase in deposit Loss from operations Income statement Common Stock, Shares Authorized Common Stock, Shares Authorized Document Fiscal Period Focus Due to Officers or Stockholders, Current Options outstanding [Axis] Total other income or gain (expense or loss) Operating expenses Current liabilities Entity Incorporation, State Country Name Entity Voluntary Filers Contingent Consideration by Type [Axis] Options granted to consultant value Options granted to consultant value Private placement Private placement Substantial Doubt about Going Concern, Management's Evaluation Note 5 - Commitments and Contingencies Supplemental disclosures: Acquisition of equipment Changes in operating assets and liabilities: Stock-based compensation Statement of cash flows Long term liabilities Officers' Compensation Crosby Other Commitments, Description Share-based Compensation Arrangement by Share-based Payment Award, Options, Outstanding, Weighted Average Exercise Price Share-based Compensation Arrangement by Share-based Payment Award, Options, Outstanding, Weighted Average Exercise Price (Increase) decrease in other assets Weighted average common shares - basic and fully diluted Total operating expenses Lease payments and exploration Common Stock, Shares Issued Preferred Stock, Shares Issued Long term deposit Equipment City Area Code Lease and option to purchase December 13, 2022 Note 2 - Nature of Operations Proceeds from convertible loan payable Write-down of mining interest Cash flows from operating activities: Consulting Total property and equipment Total property and equipment Mining interests Local Phone Number Entity Registrant Name Private placement broker units issued Private placement broker units issued Sale of Stock Substantial Doubt about Going Concern Non-cash financing activities: Increase in accounts receivable Change in fair value of warrant liability Change in derivative liability Statement of financial position Current Fiscal Year End Date Options by expiration date Payments to Acquire Mining Assets Cash flows from investing activities: Accrued liabilities Property and equipment Deposit Current assets Entity Information, Date to Change Former Legal or Registered Name Entity Current Reporting Status Share-based Compensation Arrangement by Share-based Payment Award, Options, Outstanding, Number Share-based Compensation Arrangement by Share-based Payment Award, Options, Outstanding, Number Previously capitalized payments expensed Previously capitalized payments expensed Description of Subsidiaries Description of Subsidiaries Note 4 - Capital Stock and Warrants Addition of long term deposit Increase in interest payable Common Stock, Par Value Common Stock, Par Value Other liability LIABILITIES Other assets Ryan Proceeds from Issuance of Private Placement Sale of Stock [Axis] Statement [Table] Details Proceeds from unsecured promissory notes Depreciation expense Total liabilities and shareholders' equity Total liabilities and shareholders' equity Additional paid-in-capital Total assets Total assets Entity Address, City or Town Options granted to consultant Options granted to consultant Options granted to consultant Bunker Hill Other Ownership Interests Name [Axis] Other income or gain (expense or loss) Entity Central Index Key Document Period End Date Document Type EX-101.PRE 11 bhll-20180331_pre.xml XML 12 R1.htm IDEA: XBRL DOCUMENT v3.8.0.1
Document and Entity Information - shares
9 Months Ended
Mar. 31, 2018
May 28, 2018
Document and Entity Information:    
Entity Registrant Name Bunker Hill Mining Corp.  
Document Type 10-Q  
Document Period End Date Mar. 31, 2018  
Trading Symbol bhll  
Amendment Flag false  
Entity Central Index Key 0001407583  
Current Fiscal Year End Date --06-30  
Entity Common Stock, Shares Outstanding   33,013,715
Entity Filer Category Smaller Reporting Company  
Entity Current Reporting Status Yes  
Entity Voluntary Filers No  
Entity Well-known Seasoned Issuer No  
Document Fiscal Year Focus 2018  
Document Fiscal Period Focus Q3  
Entity Incorporation, State Country Name Nevada  
Entity Incorporation, Date of Incorporation Feb. 20, 2007  
Entity Information, Date to Change Former Legal or Registered Name Sep. 29, 2017  
Entity Address, Address Line One 1802 N. Carson Street, Suite 212  
Entity Address, City or Town Carson City  
Entity Address, Postal Zip Code 89701  
Entity Information, Former Legal or Registered Name Liberty Silver Corp  
Entity Address, State or Province Nevada  
City Area Code 888  
Local Phone Number 749-4916  
XML 13 R2.htm IDEA: XBRL DOCUMENT v3.8.0.1
Bunker Hill Mining Corp. (Formerly Liberty Silver Corp.) Interim Condensed Consolidated Balance Sheets (Unaudited) - USD ($)
Mar. 31, 2018
Jun. 30, 2017
Current assets    
Cash and cash equivalents $ 2,061,215 $ 593,515
Accounts receivable 56,159 5,474
Deposit 122,769 68,582
Other assets 87,980 22,056
Prepaid expenses 346,362 132,551
Total current assets 2,674,485 822,178
Property and equipment    
Equipment 58,610 9,016
Long term deposit 41,860  
Mining interests [1] 1 300,001
Total property and equipment 100,471 309,017
Total assets 2,774,956 1,131,195
Current liabilities    
Accounts payable 65,108 261,925
Accrued liabilities 130,746 156,408
Other liability 32,581  
Total current liabilities 228,435 418,333
Long term liabilities    
Derivative liability [2] 2,776,218
Total liabilities 3,004,653 418,333
SHAREHOLDERS' EQUITY    
Preferred shares, $0.001 par value, 10,000,000 preferred shares authorized; Nil preferred shares issued and outstanding [2] 0 0
Common shares, $0.001 par value, 300,000,000 common shares authorized; 33,013,715 and 24,889,395 common shares issued and outstanding, respectively 33,013 24,889
Additional paid-in-capital 23,158,244 19,131,675
Deficit accumulated during the exploration stage (23,420,954) (18,443,702)
Total shareholders' equity (229,697) 712,862
Total liabilities and shareholders' equity [3] $ 2,774,956 $ 1,131,195
[1] Note 3
[2] Note 4
[3] Going concern (note 1), Commitments and contingencies (note 5)
XML 14 R3.htm IDEA: XBRL DOCUMENT v3.8.0.1
Statement of Financial Position - Parenthetical - $ / shares
Mar. 31, 2018
Jun. 30, 2017
Statement of financial position    
Preferred Stock, Par Value $ 0.001 $ 0.001
Preferred Stock, Shares Authorized 10,000,000 10,000,000
Preferred Stock, Shares Issued 0 0
Preferred Stock, Shares Outstanding 0 0
Common Stock, Par Value $ 0.001 $ 0.001
Common Stock, Shares Authorized 300,000,000 300,000,000
Common Stock, Shares Issued 33,013,715 24,889,395
Common Stock, Shares Outstanding 33,013,715 24,889,395
XML 15 R4.htm IDEA: XBRL DOCUMENT v3.8.0.1
Bunker Hill Mining Corp. (Formerly Liberty Silver Corp.) Interim Condensed Consolidated Statements of Operations and Comprehensive Loss (Unaudited) - USD ($)
3 Months Ended 9 Months Ended
Mar. 31, 2018
Mar. 31, 2017
Mar. 31, 2018
Mar. 31, 2017
Income statement        
Revenue $ 0 $ 0 $ 0 $ 0
Operating expenses        
Operation and administration [1] 709,806 33,484 1,764,860 110,792
Lease payments and exploration [2] 674,554 36,368 2,849,446 66,561
Legal and accounting 91,309 275,148 351,947 356,882
Consulting 142,383 58,500 527,538 83,500
Total operating expenses 1,618,052 403,500 5,493,791 617,735
Loss from operations 1,618,052 403,500 5,493,791 617,735
Other income or gain (expense or loss)        
Change in derivative liability 27,794   476,943  
Gain on foreign exchange 7,202 3,749 39,596 4,398
Interest expense   (1,362)   (77,512)
Total other income or gain (expense or loss) 34,996 2,387 516,539 (73,114)
Loss before income tax (1,583,056) (401,113) (4,977,252) (690,849)
Net loss and comprehensive loss $ (1,583,056) $ (401,113) $ (4,977,252) $ (690,849)
Loss per common share - basic and fully diluted $ (0.05) $ (0.02) $ (0.18) $ (0.05)
Weighted average common shares - basic and fully diluted 33,013,715 19,494,149 28,330,058 14,682,076
[1] Note 6
[2] Note 3
XML 16 R5.htm IDEA: XBRL DOCUMENT v3.8.0.1
Bunker Hill Mining Corp. (Formerly Liberty Silver Corp.) Interim Condensed Consolidated Statements of Cash Flows (Unaudited) - USD ($)
9 Months Ended
Mar. 31, 2018
Mar. 31, 2017
Cash flows from operating activities:    
Net loss and comprehensive loss $ (4,977,252) $ (690,849)
Adjustments to reconcile net loss to net cash used in operating activities:    
Stock-based compensation 103,815 1,381
Depreciation expense 3,796  
Write-down of mining interest 300,000  
Change in fair value of warrant liability (476,943)  
Changes in operating assets and liabilities:    
Increase in accounts receivable (50,685)  
Increase in deposit (54,187)  
(Increase) decrease in other assets (65,924) 8,260
(Increase) decrease in prepaid expenses (213,811) (10,625)
Increase (decrease) in accounts payable (196,817) 127,816
Increase in accrued liabilities (25,662) (52,714)
Increase in other liabilities 32,581  
Increase in interest payable   77,512
Net cash used in operating activities (5,621,089) (539,219)
Cash flows from investing activities:    
Acquisition of equipment (53,392)  
Addition of long term deposit (41,860)  
Net cash used in investing activities (95,252)  
Cash flows from financing activities:    
Proceeds from unsecured promissory notes   100,000
Proceeds from issuance of common stock 7,937,538 1,132,917
Share issue costs (753,497)  
Proceeds from convertible loan payable   236,085
Net cash from financing activities 7,184,041 1,469,002
Increase in cash and cash equivalents 1,467,700 929,783
Cash and cash equivalents, beginning of period 593,515 9,361
Cash and cash equivalents, end of period $ 2,061,215 939,144
Non-cash financing activities:    
Common stock issued to settle accrued interest payable   285,810
Common stock issued to settle convertible loan payable   $ 1,400,000
XML 17 R6.htm IDEA: XBRL DOCUMENT v3.8.0.1
Note 1 - Basis of Presentation and Going Concern
9 Months Ended
Mar. 31, 2018
Notes  
Note 1 - Basis of Presentation and Going Concern

Note 1 – Basis of Presentation and Going Concern

 

The accompanying unaudited interim condensed consolidated financial statements have been prepared in accordance with accounting principles generally accepted in the United States of America and the rules and regulations of the United States Securities and Exchange Commission for interim financial information. Accordingly, they do not include all the information and footnotes necessary for a comprehensive presentation of financial position, results of operations, shareholders’ equity or cash flows. It is management's opinion, however, that all material adjustments (consisting of normal recurring adjustments) have been made which are necessary for a fair financial statement presentation. The unaudited interim condensed consolidated financial statements should be read in conjunction with the Company’s Annual Report on Form 10-K, which contains the annual audited consolidated financial statements and notes thereto, together with the Management’s Discussion and Analysis, for the year ended June 30, 2017. The interim results for the period ended March 31, 2018 are not necessarily indicative of the results for the full fiscal year. The interim unaudited condensed consolidated financial statements are presented in USD, which is the functional currency.

 

These unaudited interim condensed consolidated financial statements have been prepared on a going concern basis. The Company has incurred losses since inception resulting in an accumulated deficit of $23,420,954 and further losses are anticipated in the development of its business. The ability of the Company to emerge from the exploration stage is dependent upon, among other things, obtaining additional financing to continue operations, exploration and development of the mineral properties and the discovery of, development, and sale of reserves. In order to continue to meet its plans and fiscal obligations in the current fiscal year and beyond, the Company must seek additional financing. Its ability to continue as a going concern is dependent upon the ability of the Company to generate profitable operations in the future and/or to obtain the necessary financing to meet its obligations and repay its liabilities arising from normal business operations when they come due. The accompanying unaudited interim condensed consolidated financial statements do not include any adjustments that might result from the outcome of this uncertainty.

 

Management is considering various financing alternatives including, but not limited to, raising capital through the capital markets and debt financing.  These interim condensed consolidated financial statements do not include any adjustments relating to the recoverability and classification of recorded assets, or the amounts of and classification of liabilities that might be necessary in the event the Company cannot continue in existence.  The ability of the Company to emerge from the exploration stage is dependent upon, among other things, obtaining additional financing to continue operations, explore and develop the mineral properties and the discovery, development, and sale of reserves.  These factors, among others, raise substantial doubt about the Company’s ability to continue as a going concern.

 

XML 18 R7.htm IDEA: XBRL DOCUMENT v3.8.0.1
Note 2 - Nature of Operations
9 Months Ended
Mar. 31, 2018
Notes  
Note 2 - Nature of Operations

Note 2 – Nature of Operations

 

Bunker Hill Mining Corp. (formerly Liberty Silver Corp.) (the “Company” or “Bunker”) was incorporated under the laws of the state of Nevada, U.S.A on February 20, 2007 under the name Lincoln Mining Corp.  Pursuant to a Certificate of Amendment dated February 11, 2010, the Company changed its name to Liberty Silver Corp., and on September 29, 2017 the Company changed its name to Bunker Hill Mining Corp.  The Company’s registered office is located at 1802 N. Carson Street, Suite 212, Carson City Nevada 89701, and its head office is located at 401 Bay Street, Suite 2702, Toronto, Ontario, Canada, M5H 2Y4, and its telephone number is 888-749-4916.  As of the date of this Form 10-Q, the Company had two subsidiaries, Bunker Hill Operating LLC, a Colorado corporation that is currently dormant, and American Zinc. Corp., an Idaho corporation created to facilitate the work being conducted at the Bunker Hill Mine in Idaho.

 

The Company was incorporated for the purpose of engaging in mineral exploration activities.  It continues to work at developing its projects with a view towards putting them into production.

 

XML 19 R8.htm IDEA: XBRL DOCUMENT v3.8.0.1
Note 3 - Mining Interests
9 Months Ended
Mar. 31, 2018
Notes  
Note 3 - Mining Interests

Note 3 - Mining Interests

 

Bunker Hill Mine Complex

 

On November 27, 2016, the Company entered into a non-binding letter of intent with Placer Mining Corp. (“Placer Mining”), which letter of intent was further amended on March 29, 2017, to acquire the Bunker Hill Mine located in Kellogg, Idaho, in the Coeur d’Alene Basin (the “Letter of Intent”).  Pursuant to the terms and conditions of the Letter of Intent, the acquisition, which was subject to due diligence, would include mining claims, surface rights, fee parcels, mineral interests, existing infrastructure, machinery and buildings at the Kellogg Tunnel portal in Milo Gulch, or anywhere underground at the Bunker Hill Mine Complex, but specifically excluding certain areas of the mine and property.  The acquisition would also include all current and historic data relating to the Bunker Hill Mine Complex, such as drill logs, reports, maps, and similar information located at the mine site or any other location.

 

The Company made certain payments totaling $300,000 as part of this Letter of Intent.  During the quarter ended September 30, 2017, additional payments totaling $200,000 were made to extend the negotiation period.  On August 28, 2017, the Company announced that it signed a definitive agreement (the “Agreement”) for the lease and option to purchase the Bunker Hill Mine assets (the “Bunker Assets”) (see note 5). All payments related to the lease are being expensed until the option is exercised and the $500,000 previously capitalized has been expensed in the quarter ended December 31, 2017.  During the quarter ended March 31, 2018, the $300,000 of lease payments have been expensed.

 

In November 2017, the Company negotiated an extension to the commencement of the lease to afford it time to complete an equity financing (see note 5).

 

Trinity Project

 

On August 31, 2017, the Company and Renaissance Exploration Inc. signed a notice of termination and release of exploration Earn-In Agreement.  Upon signing this agreement, the Company has terminated the March 29, 2010 Earn-In Agreement. 

 

XML 20 R9.htm IDEA: XBRL DOCUMENT v3.8.0.1
Note 4 - Capital Stock and Warrants
9 Months Ended
Mar. 31, 2018
Notes  
Note 4 - Capital Stock and Warrants

Note 4 – Capital Stock and Warrants

 

Authorized

 

The total authorized capital is as follows:

-          300,000,000 common shares with a par value of $0.001 per common share; and

-          10,000,000 preferred shares with a par value of $0.001 per preferred share

Issued and outstanding

 

In December 2017, Bunker announced that it closed a private placement led by Red Cloud Klondike Strike Inc. and including Haywood Securities Inc. (collectively, the “Agents”) to raise gross proceeds of CDN$10,155,400 (the “Offering”). Pursuant to the Offering, the Company issued 8,124,320 units (the "Units") at a price of CDN$1.25 per Unit.  Each Unit was comprised of one common share of the Company (a "Common Share") and one half of one transferable common share purchase warrant (a "Warrant"), each Warrant having a three-year life and entitling the holder thereof to acquire one Common Share at a price of CDN$2.00.

 

The Company has accounted for the warrant liability in accordance with ASC Topic 815. These warrants are considered derivative instruments as they were issued in a currency other than the Company’s functional currency of the US dollar. The estimated fair value of warrants accounted for as liabilities was determined on the date of issue and marks to market at each financial reporting period. The change in fair value of the warrant liability is recorded in the interim condensed consolidated statement of operations and comprehensive loss as a gain or loss and is estimated using the Binomial model.

 

The proceeds from the Offering are being used primarily for lease payments, acquisition payments, exploration and development at the Bunker Hill Mine and for general corporate and working capital purposes.

 

In connection with the Offering, the Agents received a cash fee in an amount equal to 8.0% of the gross proceeds of the Offering (excluding proceeds from certain president's list subscribers) and were granted common share purchase warrants (the "Broker Warrants") entitling them to subscribe for that number of Common Shares equal to 4.0% of the aggregate number of Units sold in the Offering (excluding Units sold to certain president's list subscribers). Each Broker Warrant is exercisable at a price equal to CDN$2.00 for thirty-six months following its issuance. The Company issued an aggregate of 278,160 Broker Warrants to the Agents in connection with the Offering.

 

At March 31, 2018 there were 33,013,715 common shares issued and outstanding.

 

Warrants

 

As of March 31, 2018, the Company had 4,340,320 warrants outstanding, all issued pursuant to the equity financing completed in December 2017 and described above.

 

Stock Options

 

In December 2017, 100,000 options were granted to a consultant with a five-year life and an exercise price of CDN$1.65.  these options vested immediately and, using the Black Scholes option pricing method, had a value of CDN$103,815, which value is expensed on as stock based compensation on the statement of operations.  As at March 31, 2018, there were 2,391,000 stock options outstanding, exercisable at a weighted average exercise price of CDN$1.01 per share.  Of this total, 56,000 have an exercise price of $0.1875 and expire on February 17, 2020, 2,235,000 have an exercise price of CDN$1.00 and expire May 2, 2022 and 100,000 have an exercise price of CDN$1.65 and expire December 13, 2022.

 

XML 21 R10.htm IDEA: XBRL DOCUMENT v3.8.0.1
Note 5 - Commitments and Contingencies
9 Months Ended
Mar. 31, 2018
Notes  
Note 5 - Commitments and Contingencies

Note 5 – Commitments and Contingencies

 

Effective June 1, 2017, the Company has a lease agreement for office space at 401 Bay Street, Suite 2702, Toronto, Ontario, Canada, M5H 2Y4.  The 5-year lease provides for a monthly base rent of CDN$12,964 for the first two years, increasing to CDN$13,504 per month for years three through five.  The Company has signed sub-leases with other companies that cover 78% of the monthly lease amount.

 

Pursuant to its Agreement for the lease and option to purchase the Bunker Assets, the Company made two $500,000 bonus payments to Placer Mining.  The 24-month lease was to commence November 1, 2017 but was deferred to December 1, 2017 and continues until October 31, 2019.   The lease period can be extended by a further 12 months at the Company’s discretion.  During the term of the lease, the Company must make $100,000 monthly mining lease payments, paid quarterly.

 

The Company has an option to purchase the Bunker Assets at any time before the end of the lease and any extension for a purchase price of $25 million with purchase payments to be made over a ten-year period. Under terms of the agreement, there is a 3% net smelter return royalty (“NSR”) on sales during the Lease and a 1.5% NSR on the sales after the purchase option is exercised, which post-acquisition NSR is capped at $60 million.

 

In addition to the payments to Placer Mining, pursuant to an agreement with the United States Environmental Protection Agency (“EPA”) whereby for so long as Bunker leases, owns and/or occupies the Bunker Hill Mine, the Company will make payments to the EPA on behalf of the current owner in satisfaction of the EPA’s claim for cost recovery.  Payments to the EPA will start with $1 million 30 days after a fully ratified agreement is signed followed by $2 million on November 1, 2018 and $3 million on each of the next 5 anniversaries with a final $2 million payment on November 1, 2024.

 

In addition to the above payments, the EPA will also be paid $480,000 within 30 days after a fully ratified agreement is signed with the EPA and every six months thereafter for as long as Bunker leases, owns, and/or occupies the mine.  These payments are for estimated ongoing water treatment costs which the Company agreed to begin payment upon commencement of the mine lease.

 

XML 22 R11.htm IDEA: XBRL DOCUMENT v3.8.0.1
Note 6 - Related Party Transactions
9 Months Ended
Mar. 31, 2018
Notes  
Note 6 - Related Party Transactions

Note 6 – Related Party Transactions

 

Through November 30, 2017, each of Messrs. Bruce Reid (CEO), Julio DiGirolamo (CFO), Howard Crosby (Executive Vice President) and John Ryan (Director) received $5,000 per month for services to the Company.  Payments to Messrs., Crosby and Ryan continued at this rate through March 31, 2018.  Commencing December 1, 2017, commensurate with the increased activities in the Company, Messrs. Reid and DiGirolamo’s pay increased to $20,000 and $15,000 per month, respectively.  In early December 2017, the Board approved and ratified compensation to Mr. Reid for unaccrued and unpaid salary and bonus, including for risk-capital sums advanced by Mr. Reid to the Company in order that the Company could complete many of its obligations and initiatives during 2017.  The payment, totaling $500,000 was accrued at December 31, 2017 and was paid in January 2018.

 

XML 23 R12.htm IDEA: XBRL DOCUMENT v3.8.0.1
Note 1 - Basis of Presentation and Going Concern (Details) - USD ($)
9 Months Ended
Mar. 31, 2018
Jun. 30, 2017
Details    
Substantial Doubt about Going Concern These unaudited interim condensed consolidated financial statements have been prepared on a going concern basis. The Company has incurred losses since inception resulting in an accumulated deficit of $23,420,954 and further losses are anticipated in the development of its business. The ability of the Company to emerge from the exploration stage is dependent upon, among other things, obtaining additional financing to continue operations, exploration and development of the mineral properties and the discovery of, development, and sale of reserves. In order to continue to meet its plans and fiscal obligations in the current fiscal year and beyond, the Company must seek additional financing. Its ability to continue as a going concern is dependent upon the ability of the Company to generate profitable operations in the future and/or to obtain the necessary financing to meet its obligations and repay its liabilities arising from normal business operations when they come due. The accompanying unaudited interim condensed consolidated financial statements do not include any adjustments that might result from the outcome of this uncertainty.  
Deficit accumulated during the exploration stage $ 23,420,954 $ 18,443,702
Substantial Doubt about Going Concern, Management's Evaluation Management is considering various financing alternatives including, but not limited to, raising capital through the capital markets and debt financing.  
XML 24 R13.htm IDEA: XBRL DOCUMENT v3.8.0.1
Note 2 - Nature of Operations (Details)
9 Months Ended
Mar. 31, 2018
Details  
Entity Incorporation, State Country Name Nevada
Entity Incorporation, Date of Incorporation Feb. 20, 2007
Entity Information, Former Legal or Registered Name Liberty Silver Corp
Entity Information, Date to Change Former Legal or Registered Name Sep. 29, 2017
Entity Address, Address Line One 1802 N. Carson Street, Suite 212
Entity Address, City or Town Carson City
Entity Address, State or Province Nevada
Entity Address, Postal Zip Code 89701
City Area Code 888
Local Phone Number 749-4916
Description of Subsidiaries As of the date of this Form 10-Q, the Company had two subsidiaries, Bunker Hill Operating LLC, a Colorado corporation that is currently dormant, and American Zinc. Corp., an Idaho corporation created to facilitate the work being conducted at the Bunker Hill Mine in Idaho.
XML 25 R14.htm IDEA: XBRL DOCUMENT v3.8.0.1
Note 3 - Mining Interests (Details) - USD ($)
3 Months Ended 9 Months Ended
Mar. 31, 2018
Dec. 31, 2017
Mar. 31, 2017
Mar. 31, 2018
Previously capitalized payments expensed $ 300,000      
Bunker Hill        
Equity Method Investment, Description of Principal Activities       Bunker Hill Mine Complex On November 27, 2016, the Company entered into a non-binding letter of intent with Placer Mining Corp. (“Placer Mining”), which letter of intent was further amended on March 29, 2017, to acquire the Bunker Hill Mine located in Kellogg, Idaho, in the Coeur d’Alene Basin (the “Letter of Intent”). Pursuant to the terms and conditions of the Letter of Intent, the acquisition, which was subject to due diligence, would include mining claims, surface rights, fee parcels, mineral interests, existing infrastructure, machinery and buildings at the Kellogg Tunnel portal in Milo Gulch, or anywhere underground at the Bunker Hill Mine Complex, but specifically excluding certain areas of the mine and property. The acquisition would also include all current and historic data relating to the Bunker Hill Mine Complex, such as drill logs, reports, maps, and similar information located at the mine site or any other location. The Company made certain payments totaling $300,000 as part of this Letter of Intent. During the quarter ended September 30, 2017, additional payments totaling $200,000 were made to extend the negotiation period. On August 28, 2017, the Company announced that it signed a definitive agreement (the “Agreement”) for the lease and option to purchase the Bunker Hill Mine assets (the “Bunker Assets”) (see note 5). All payments related to the lease are being expensed until the option is exercised and the $500,000 previously capitalized has been expensed in the quarter ended December 31, 2017. During the quarter ended March 31, 2018, the $300,000 of lease payments have been expensed. In November 2017, the Company negotiated an extension to the commencement of the lease to afford it time to complete an equity financing (see note 5).
Payments to Acquire Mining Assets   $ 200,000 $ 300,000  
Previously capitalized payments expensed   $ 500,000    
Trinity        
Equity Method Investment, Description of Principal Activities       Trinity Project On August 31, 2017, the Company and Renaissance Exploration Inc. signed a notice of termination and release of exploration Earn-In Agreement. Upon signing this agreement, the Company has terminated the March 29, 2010 Earn-In Agreement.
XML 26 R15.htm IDEA: XBRL DOCUMENT v3.8.0.1
Note 4 - Capital Stock and Warrants (Details)
3 Months Ended
Dec. 31, 2017
$ / shares
$ / shares
Dec. 31, 2017
CAD ($)
$ / shares
shares
Mar. 31, 2018
USD ($)
$ / shares
shares
Mar. 31, 2018
$ / shares
Jun. 30, 2017
$ / shares
shares
Common Stock, Shares Authorized     300,000,000   300,000,000
Common Stock, Par Value | $ / shares     $ 0.001   $ 0.001
Preferred Stock, Shares Authorized     10,000,000   10,000,000
Preferred Stock, Par Value | $ / shares     $ 0.001   $ 0.001
Shares outstanding     33,013,715    
Warrants and Rights Outstanding | $     $ 4,340,320    
Options granted to consultant   100,000      
Options granted to consultant price per share | $ / shares   $ 1.65      
Options granted to consultant value | $   $ 103,815      
Share-based Compensation Arrangement by Share-based Payment Award, Options, Outstanding, Number     2,391,000    
Share-based Compensation Arrangement by Share-based Payment Award, Options, Outstanding, Weighted Average Exercise Price | $ / shares $ 1.01 $ 1.01      
Share-based Compensation Arrangement by Share-based Payment Award, Options, Outstanding, Number     2,391,000    
Options granted to consultant   100,000      
Options granted to consultant price per share | $ / shares   $ 1.65      
February 17, 2020          
Share-based Compensation Arrangement by Share-based Payment Award, Options, Outstanding, Number     56,000    
Share-based Compensation Arrangement by Share-based Payment Award, Options, Outstanding, Weighted Average Exercise Price | $ / shares       $ 0.1875  
Share-based Compensation Arrangement by Share-based Payment Award, Options, Outstanding, Number     56,000    
May 2, 2022          
Share-based Compensation Arrangement by Share-based Payment Award, Options, Outstanding, Number     2,235,000    
Share-based Compensation Arrangement by Share-based Payment Award, Options, Outstanding, Weighted Average Exercise Price | $ / shares       $ 1.00  
Share-based Compensation Arrangement by Share-based Payment Award, Options, Outstanding, Number     2,235,000    
December 13, 2022          
Options granted to consultant   100,000      
Options granted to consultant price per share | $ / shares   $ 1.65      
Options granted to consultant   100,000      
Options granted to consultant price per share | $ / shares   $ 1.65      
Private placement          
Proceeds from Issuance of Private Placement | $   $ 10,155,400      
Private placement units issued   8,124,320      
Private placement price per unit | $ / shares $ 1.25        
Private placement broker units issued   278,160      
XML 27 R16.htm IDEA: XBRL DOCUMENT v3.8.0.1
Note 5 - Commitments and Contingencies (Details)
9 Months Ended
Mar. 31, 2018
Office lease  
Other Commitments, Description Effective June 1, 2017, the Company has a lease agreement for office space at 401 Bay Street, Suite 2702, Toronto, Ontario, Canada, M5H 2Y4. The 5-year lease provides for a monthly base rent of CDN$12,964 for the first two years, increasing to CDN$13,504 per month for years three through five. The Company has signed sub-leases with other companies that cover 78% of the monthly lease amount.
Lease and option to purchase  
Other Commitments, Description Pursuant to its Agreement for the lease and option to purchase the Bunker Assets, the Company made two $500,000 bonus payments to Placer Mining. The 24-month lease was to commence November 1, 2017 but was deferred to December 1, 2017 and continues until October 31, 2019. The lease period can be extended by a further 12 months at the Company’s discretion. During the term of the lease, the Company must make $100,000 monthly mining lease payments, paid quarterly. The Company has an option to purchase the Bunker Assets at any time before the end of the lease and any extension for a purchase price of $25 million with purchase payments to be made over a ten-year period. Under terms of the agreement, there is a 3% net smelter return royalty (“NSR”) on sales during the Lease and a 1.5% NSR on the sales after the purchase option is exercised, which post-acquisition NSR is capped at $60 million.
EPA  
Other Commitments, Description In addition to the payments to Placer Mining, pursuant to an agreement with the United States Environmental Protection Agency (“EPA”) whereby for so long as Bunker leases, owns and/or occupies the Bunker Hill Mine, the Company will make payments to the EPA on behalf of the current owner in satisfaction of the EPA’s claim for cost recovery. Payments to the EPA will start with $1 million 30 days after a fully ratified agreement is signed followed by $2 million on November 1, 2018 and $3 million on each of the next 5 anniversaries with a final $2 million payment on November 1, 2024. In addition to the above payments, the EPA will also be paid $480,000 within 30 days after a fully ratified agreement is signed with the EPA and every six months thereafter for as long as Bunker leases, owns, and/or occupies the mine. These payments are for estimated ongoing water treatment costs which the Company agreed to begin payment upon commencement of the mine lease.
XML 28 R17.htm IDEA: XBRL DOCUMENT v3.8.0.1
Note 6 - Related Party Transactions (Details) - USD ($)
4 Months Ended 5 Months Ended
Mar. 31, 2018
Nov. 30, 2017
Dec. 31, 2017
Reid      
Officers' Compensation $ 20,000 $ 5,000  
Due to Officers or Stockholders, Current     $ 500,000
DiGirolamo      
Officers' Compensation 15,000 5,000  
Crosby      
Officers' Compensation 5,000 5,000  
Ryan      
Officers' Compensation $ 5,000 $ 5,000  
EXCEL 29 Financial_Report.xlsx IDEA: XBRL DOCUMENT begin 644 Financial_Report.xlsx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�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end XML 30 Show.js IDEA: XBRL DOCUMENT /** * Rivet Software Inc. * * @copyright Copyright (c) 2006-2011 Rivet Software, Inc. All rights reserved. * Version 2.4.0.3 * */ var Show = {}; Show.LastAR = null, Show.hideAR = function(){ Show.LastAR.style.display = 'none'; }; Show.showAR = function ( link, id, win ){ if( Show.LastAR ){ Show.hideAR(); } var ref = link; do { ref = ref.nextSibling; } while (ref && ref.nodeName != 'TABLE'); if (!ref || ref.nodeName != 'TABLE') { var tmp = win ? win.document.getElementById(id) : document.getElementById(id); if( tmp ){ ref = tmp.cloneNode(true); ref.id = ''; link.parentNode.appendChild(ref); } } if( ref ){ ref.style.display = 'block'; Show.LastAR = ref; } }; Show.toggleNext = function( link ){ var ref = link; do{ ref = ref.nextSibling; }while( ref.nodeName != 'DIV' ); if( ref.style && ref.style.display && ref.style.display == 'none' ){ ref.style.display = 'block'; if( link.textContent ){ link.textContent = link.textContent.replace( '+', '-' ); }else{ link.innerText = link.innerText.replace( '+', '-' ); } }else{ ref.style.display = 'none'; if( link.textContent ){ link.textContent = link.textContent.replace( '-', '+' ); }else{ link.innerText = link.innerText.replace( '-', '+' ); } } }; XML 31 report.css IDEA: XBRL DOCUMENT /* Updated 2009-11-04 */ /* v2.2.0.24 */ /* DefRef Styles */ ..report table.authRefData{ background-color: #def; border: 2px solid #2F4497; font-size: 1em; position: absolute; } ..report table.authRefData a { display: block; font-weight: bold; } ..report table.authRefData p { margin-top: 0px; } ..report table.authRefData .hide { background-color: #2F4497; padding: 1px 3px 0px 0px; text-align: right; } ..report table.authRefData .hide a:hover { background-color: #2F4497; } ..report table.authRefData .body { height: 150px; overflow: auto; width: 400px; } ..report table.authRefData table{ font-size: 1em; } /* Report Styles */ ..pl a, .pl a:visited { color: black; text-decoration: none; } /* table */ ..report { background-color: white; border: 2px solid #acf; clear: both; color: black; font: normal 8pt Helvetica, Arial, san-serif; margin-bottom: 2em; } ..report hr { border: 1px solid #acf; } /* Top labels */ ..report th { background-color: #acf; color: black; font-weight: bold; text-align: center; } ..report th.void { background-color: transparent; color: #000000; font: bold 10pt Helvetica, Arial, san-serif; text-align: left; } ..report .pl { text-align: left; vertical-align: top; white-space: normal; width: 200px; white-space: normal; /* word-wrap: break-word; */ } ..report td.pl a.a { cursor: pointer; display: block; width: 200px; overflow: hidden; } ..report td.pl div.a { width: 200px; } ..report td.pl a:hover { background-color: #ffc; } /* Header rows... */ ..report tr.rh { background-color: #acf; color: black; font-weight: bold; } /* Calendars... */ ..report .rc { background-color: #f0f0f0; } /* Even rows... */ ..report .re, .report .reu { background-color: #def; } ..report .reu td { border-bottom: 1px solid black; } /* Odd rows... */ ..report .ro, .report .rou { background-color: white; } ..report .rou td { border-bottom: 1px solid black; } ..report .rou table td, .report .reu table td { border-bottom: 0px solid black; } /* styles for footnote marker */ ..report .fn { white-space: nowrap; } /* styles for numeric types */ ..report .num, .report .nump { text-align: right; white-space: nowrap; } ..report .nump { padding-left: 2em; } ..report .nump { padding: 0px 0.4em 0px 2em; } /* styles for text types */ ..report .text { text-align: left; white-space: normal; } ..report .text .big { margin-bottom: 1em; width: 17em; } ..report .text .more { display: none; } ..report .text .note { font-style: italic; font-weight: bold; } ..report .text .small { width: 10em; } ..report sup { font-style: italic; } ..report .outerFootnotes { font-size: 1em; } XML 33 FilingSummary.xml IDEA: XBRL DOCUMENT 3.8.0.1 html 31 120 1 true 13 0 false 5 false false R1.htm 000010 - Document - Document and Entity Information Sheet http://www.bunkerhillmining.com/20180331/role/idr_DocumentDocumentAndEntityInformation Document and Entity Information Cover 1 false false R2.htm 000020 - Statement - Bunker Hill Mining Corp. (Formerly Liberty Silver Corp.) Interim Condensed Consolidated Balance Sheets (Unaudited) Sheet http://www.bunkerhillmining.com/20180331/role/idr_BunkerHillMiningCorpFormerlyLibertySilverCorpInterimCondensedConsolidatedBalanceSheetsUnaudited Bunker Hill Mining Corp. (Formerly Liberty Silver Corp.) Interim Condensed Consolidated Balance Sheets (Unaudited) Statements 2 false false R3.htm 000030 - Statement - Statement of Financial Position - Parenthetical Sheet http://www.bunkerhillmining.com/20180331/role/idr_StatementOfFinancialPositionParenthetical Statement of Financial Position - Parenthetical Statements 3 false false R4.htm 000040 - Statement - Bunker Hill Mining Corp. (Formerly Liberty Silver Corp.) Interim Condensed Consolidated Statements of Operations and Comprehensive Loss (Unaudited) Sheet http://www.bunkerhillmining.com/20180331/role/idr_BunkerHillMiningCorpFormerlyLibertySilverCorpInterimCondensedConsolidatedStatementsOfOperationsAndComprehensiveLossUnaudited Bunker Hill Mining Corp. (Formerly Liberty Silver Corp.) Interim Condensed Consolidated Statements of Operations and Comprehensive Loss (Unaudited) Statements 4 false false R5.htm 000050 - Statement - Bunker Hill Mining Corp. (Formerly Liberty Silver Corp.) Interim Condensed Consolidated Statements of Cash Flows (Unaudited) Sheet http://www.bunkerhillmining.com/20180331/role/idr_BunkerHillMiningCorpFormerlyLibertySilverCorpInterimCondensedConsolidatedStatementsOfCashFlowsUnaudited Bunker Hill Mining Corp. (Formerly Liberty Silver Corp.) Interim Condensed Consolidated Statements of Cash Flows (Unaudited) Statements 5 false false R6.htm 000060 - Disclosure - Note 1 - Basis of Presentation and Going Concern Sheet http://www.bunkerhillmining.com/20180331/role/idr_DisclosureNote1BasisOfPresentationAndGoingConcern Note 1 - Basis of Presentation and Going Concern Notes 6 false false R7.htm 000070 - Disclosure - Note 2 - Nature of Operations Sheet http://www.bunkerhillmining.com/20180331/role/idr_DisclosureNote2NatureOfOperations Note 2 - Nature of Operations Notes 7 false false R8.htm 000080 - Disclosure - Note 3 - Mining Interests Sheet http://www.bunkerhillmining.com/20180331/role/idr_DisclosureNote3MiningInterests Note 3 - Mining Interests Notes 8 false false R9.htm 000090 - Disclosure - Note 4 - Capital Stock and Warrants Sheet http://www.bunkerhillmining.com/20180331/role/idr_DisclosureNote4CapitalStockAndWarrants Note 4 - Capital Stock and Warrants Notes 9 false false R10.htm 000100 - Disclosure - Note 5 - Commitments and Contingencies Sheet http://www.bunkerhillmining.com/20180331/role/idr_DisclosureNote5CommitmentsAndContingencies Note 5 - Commitments and Contingencies Notes 10 false false R11.htm 000110 - Disclosure - Note 6 - Related Party Transactions Sheet http://www.bunkerhillmining.com/20180331/role/idr_DisclosureNote6RelatedPartyTransactions Note 6 - Related Party Transactions Notes 11 false false R12.htm 000120 - Disclosure - Note 1 - Basis of Presentation and Going Concern (Details) Sheet http://www.bunkerhillmining.com/20180331/role/idr_DisclosureNote1BasisOfPresentationAndGoingConcernDetails Note 1 - Basis of Presentation and Going Concern (Details) Details http://www.bunkerhillmining.com/20180331/role/idr_DisclosureNote1BasisOfPresentationAndGoingConcern 12 false false R13.htm 000130 - Disclosure - Note 2 - Nature of Operations (Details) Sheet http://www.bunkerhillmining.com/20180331/role/idr_DisclosureNote2NatureOfOperationsDetails Note 2 - Nature of Operations (Details) Details http://www.bunkerhillmining.com/20180331/role/idr_DisclosureNote2NatureOfOperations 13 false false R14.htm 000140 - Disclosure - Note 3 - Mining Interests (Details) Sheet http://www.bunkerhillmining.com/20180331/role/idr_DisclosureNote3MiningInterestsDetails Note 3 - Mining Interests (Details) Details http://www.bunkerhillmining.com/20180331/role/idr_DisclosureNote3MiningInterests 14 false false R15.htm 000150 - Disclosure - Note 4 - Capital Stock and Warrants (Details) Sheet http://www.bunkerhillmining.com/20180331/role/idr_DisclosureNote4CapitalStockAndWarrantsDetails Note 4 - Capital Stock and Warrants (Details) Details http://www.bunkerhillmining.com/20180331/role/idr_DisclosureNote4CapitalStockAndWarrants 15 false false R16.htm 000160 - Disclosure - Note 5 - Commitments and Contingencies (Details) Sheet http://www.bunkerhillmining.com/20180331/role/idr_DisclosureNote5CommitmentsAndContingenciesDetails Note 5 - Commitments and Contingencies (Details) Details http://www.bunkerhillmining.com/20180331/role/idr_DisclosureNote5CommitmentsAndContingencies 16 false false R17.htm 000170 - Disclosure - Note 6 - Related Party Transactions (Details) Sheet http://www.bunkerhillmining.com/20180331/role/idr_DisclosureNote6RelatedPartyTransactionsDetails Note 6 - Related Party Transactions (Details) Details http://www.bunkerhillmining.com/20180331/role/idr_DisclosureNote6RelatedPartyTransactions 17 false false All Reports Book All Reports bhll-20180331.xml bhll-20180331.xsd bhll-20180331_cal.xml bhll-20180331_def.xml bhll-20180331_lab.xml bhll-20180331_pre.xml http://xbrl.sec.gov/dei/2014-01-31 http://fasb.org/us-gaap/2017-01-31 true true ZIP 35 0001052918-18-000178-xbrl.zip IDEA: XBRL DOCUMENT begin 644 0001052918-18-000178-xbrl.zip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