﻿<?xml version="1.0" encoding="utf-8"?>
<InstanceReport xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:xsd="http://www.w3.org/2001/XMLSchema">
  <Version>2.2.0.7</Version>
  <hasSegments>false</hasSegments>
  <ReportName>Commitments and Contingencies</ReportName>
  <ReportLongName>006120 - Disclosure - Commitments and Contingencies</ReportLongName>
  <DisplayLabelColumn>true</DisplayLabelColumn>
  <ShowElementNames>false</ShowElementNames>
  <RoundingOption />
  <HasEmbeddedReports>false</HasEmbeddedReports>
  <Columns>
    <Column>
      <LabelColumn>false</LabelColumn>
      <Id>1</Id>
      <Labels>
        <Label Id="1" Label="6 Months Ended" />
        <Label Id="2" Label="Jun. 30, 2010" />
      </Labels>
      <CurrencyCode>USD</CurrencyCode>
      <FootnoteIndexer />
      <hasSegments>false</hasSegments>
      <hasScenarios>false</hasScenarios>
      <Segments />
      <Scenarios />
      <Units>
        <Unit>
          <UnitID>u000</UnitID>
          <UnitType>Standard</UnitType>
          <StandardMeasure>
            <MeasureSchema>http://www.xbrl.org/2003/iso4217</MeasureSchema>
            <MeasureValue>USD</MeasureValue>
            <MeasureNamespace>iso4217</MeasureNamespace>
          </StandardMeasure>
          <Scale>0</Scale>
        </Unit>
        <Unit>
          <UnitID>u002</UnitID>
          <UnitType>Divide</UnitType>
          <NumeratorMeasure>
            <MeasureSchema>http://www.xbrl.org/2003/iso4217</MeasureSchema>
            <MeasureValue>USD</MeasureValue>
            <MeasureNamespace>iso4217</MeasureNamespace>
          </NumeratorMeasure>
          <DenominatorMeasure>
            <MeasureSchema>http://www.xbrl.org/2003/instance</MeasureSchema>
            <MeasureValue>shares</MeasureValue>
            <MeasureNamespace>xbrli</MeasureNamespace>
          </DenominatorMeasure>
          <Scale>0</Scale>
        </Unit>
        <Unit>
          <UnitID>u001</UnitID>
          <UnitType>Standard</UnitType>
          <StandardMeasure>
            <MeasureSchema>http://www.xbrl.org/2003/instance</MeasureSchema>
            <MeasureValue>shares</MeasureValue>
            <MeasureNamespace>xbrli</MeasureNamespace>
          </StandardMeasure>
          <Scale>0</Scale>
        </Unit>
      </Units>
      <CurrencySymbol>$</CurrencySymbol>
    </Column>
  </Columns>
  <Rows>
    <Row>
      <Id>2</Id>
      <Label>Notes to Financial Statements [Abstract]</Label>
      <Level>0</Level>
      <ElementName>dyn_NotesToFinancialStatementsAbstract</ElementName>
      <ElementPrefix>dyn</ElementPrefix>
      <IsBaseElement>false</IsBaseElement>
      <BalanceType>na</BalanceType>
      <PeriodType>duration</PeriodType>
      <ShortDefinition>No definition available.</ShortDefinition>
      <IsReportTitle>false</IsReportTitle>
      <IsSegmentTitle>false</IsSegmentTitle>
      <IsSubReportEnd>false</IsSubReportEnd>
      <IsCalendarTitle>false</IsCalendarTitle>
      <IsTuple>false</IsTuple>
      <IsAbstractGroupTitle>true</IsAbstractGroupTitle>
      <IsEquityPrevioslyReportedAsRow>false</IsEquityPrevioslyReportedAsRow>
      <IsEquityAdjustmentRow>false</IsEquityAdjustmentRow>
      <IsBeginningBalance>false</IsBeginningBalance>
      <IsEndingBalance>false</IsEndingBalance>
      <IsReverseSign>false</IsReverseSign>
      <PreferredLabelRole />
      <IsEPS>false</IsEPS>
      <FootnoteIndexer />
      <Cells>
        <Cell>
          <Id>1</Id>
          <ShowCurrencySymbol>false</ShowCurrencySymbol>
          <IsNumeric>false</IsNumeric>
          <IsRatio>false</IsRatio>
          <DisplayZeroAsNone>false</DisplayZeroAsNone>
          <NumericAmount>0</NumericAmount>
          <RoundedNumericAmount>0</RoundedNumericAmount>
          <NonNumbericText />
          <NonNumericTextHeader />
          <FootnoteIndexer />
          <hasSegments>false</hasSegments>
          <hasScenarios>false</hasScenarios>
          <DisplayDateInUSFormat>false</DisplayDateInUSFormat>
        </Cell>
      </Cells>
      <OriginalInstanceReportColumns />
      <ElementDataType>xbrli:stringItemType</ElementDataType>
      <SimpleDataType>string</SimpleDataType>
      <ElementDefenition>No definition available.</ElementDefenition>
      <IsTotalLabel>false</IsTotalLabel>
    </Row>
    <Row>
      <Id>3</Id>
      <Label>Commitments and contingencies</Label>
      <Level>1</Level>
      <ElementName>us-gaap_CommitmentsAndContingenciesDisclosureTextBlock</ElementName>
      <ElementPrefix>us-gaap</ElementPrefix>
      <IsBaseElement>true</IsBaseElement>
      <BalanceType>na</BalanceType>
      <PeriodType>duration</PeriodType>
      <ShortDefinition>No definition available.</ShortDefinition>
      <IsReportTitle>false</IsReportTitle>
      <IsSegmentTitle>false</IsSegmentTitle>
      <IsSubReportEnd>false</IsSubReportEnd>
      <IsCalendarTitle>false</IsCalendarTitle>
      <IsTuple>false</IsTuple>
      <IsAbstractGroupTitle>false</IsAbstractGroupTitle>
      <IsEquityPrevioslyReportedAsRow>false</IsEquityPrevioslyReportedAsRow>
      <IsEquityAdjustmentRow>false</IsEquityAdjustmentRow>
      <IsBeginningBalance>false</IsBeginningBalance>
      <IsEndingBalance>false</IsEndingBalance>
      <IsReverseSign>false</IsReverseSign>
      <PreferredLabelRole />
      <IsEPS>false</IsEPS>
      <FootnoteIndexer />
      <Cells>
        <Cell>
          <Id>1</Id>
          <ShowCurrencySymbol>false</ShowCurrencySymbol>
          <IsNumeric>false</IsNumeric>
          <IsRatio>false</IsRatio>
          <DisplayZeroAsNone>false</DisplayZeroAsNone>
          <NumericAmount>0</NumericAmount>
          <RoundedNumericAmount>0</RoundedNumericAmount>
          <NonNumbericText>&lt;div style="DISPLAY: block; MARGIN-LEFT: 0pt; TEXT-INDENT: 0pt; MARGIN-RIGHT: 0pt" align="left"&gt;&lt;font style="DISPLAY: inline; FONT-WEIGHT: bold; FONT-SIZE: 10pt; FONT-FAMILY: Times New Roman"&gt;Note 12&amp;#8212;Commitments and Contingencies&lt;/font&gt;&lt;/div&gt;&lt;div style="DISPLAY: block; TEXT-INDENT: 0pt"&gt;&lt;br /&gt;&lt;/div&gt;&lt;div style="DISPLAY: block; MARGIN-LEFT: 0pt; TEXT-INDENT: 18pt; MARGIN-RIGHT: 0pt" align="left"&gt;&lt;font style="DISPLAY: inline; FONT-WEIGHT: bold; FONT-SIZE: 10pt; FONT-FAMILY: Times New Roman"&gt;Legal Proceedings&lt;/font&gt;&lt;/div&gt;&lt;div style="DISPLAY: block; TEXT-INDENT: 0pt"&gt;&lt;br /&gt;&lt;/div&gt;&lt;div style="DISPLAY: block; MARGIN-LEFT: 0pt; TEXT-INDENT: 27pt; MARGIN-RIGHT: 0pt" align="left"&gt;&lt;font style="DISPLAY: inline; FONT-SIZE: 10pt; FONT-FAMILY: Times New Roman"&gt;Set forth below is a summary of our material ongoing legal proceedings.&amp;#160;&amp;#160;We record reserves for contingencies when information available indicates that a loss is probable and the amount of the loss is reasonably estimable.&amp;#160;&amp;#160;In addition, we disclose matters for which management believes a material loss is at least reasonably possible.&amp;#160;&amp;#160;In all instances, management has assessed the matters below based on current information and made a judgment concerning their potential outcome, giving due consideration to the nature of the claim, the amount and nature of damages sought and the probability of success.&amp;#160;&amp;#160;Management&amp;#8217;s judgment may prove materially inaccurate and such judgment is made subject to the known uncertainty of litigation.&lt;/font&gt;&lt;/div&gt;&lt;div style="DISPLAY: block; TEXT-INDENT: 0pt"&gt;&lt;br /&gt;&lt;/div&gt;&lt;div style="DISPLAY: block; MARGIN-LEFT: 0pt; TEXT-INDENT: 27pt; MARGIN-RIGHT: 0pt" align="left"&gt;&lt;font style="DISPLAY: inline; FONT-SIZE: 10pt; FONT-FAMILY: Times New Roman"&gt;&lt;font style="DISPLAY: inline; FONT-WEIGHT: bold; FONT-STYLE: italic"&gt;Gas Index Pricing Litigation.&lt;/font&gt;&amp;#160;&amp;#160;We, several of our affiliates, our former joint venture affiliate and other energy companies were named as defendants in numerous lawsuits in state and federal court claiming damages resulting from alleged price manipulation and false reporting of natural gas prices to various index publications in the 2000-2002 timeframe.&amp;#160;&amp;#160;Many of the cases have been resolved and those which remain are pending in Nevada federal district court.&amp;#160;&amp;#160;Recent developments include:&lt;/font&gt;&lt;/div&gt;&lt;div style="DISPLAY: block; MARGIN-LEFT: 0pt; TEXT-INDENT: 0pt; MARGIN-RIGHT: 0pt" align="justify"&gt;&amp;#160;&lt;/div&gt;&lt;div&gt;&lt;table style="FONT-SIZE: 10pt; FONT-FAMILY: Times New Roman" cellspacing="0" cellpadding="0" width="100%"&gt;&lt;tr valign="top"&gt;&lt;td style="WIDTH: 45pt" align="right"&gt;&lt;div&gt;&lt;font style="DISPLAY: inline; FONT-SIZE: 10pt; FONT-FAMILY: Symbol, serif"&gt;&amp;#183;&amp;#160;&amp;#160;&lt;/font&gt;&lt;/div&gt;&lt;/td&gt;&lt;td&gt;&lt;div style="MARGIN-LEFT: 0pt; TEXT-INDENT: 0pt; MARGIN-RIGHT: 0pt" align="justify"&gt;&lt;font style="DISPLAY: inline; FONT-SIZE: 10pt; FONT-FAMILY: Times New Roman"&gt;In February 2007, the Tennessee state court dismissed a class action on defendants&amp;#8217; motion.&amp;#160;&amp;#160;Plaintiffs appealed and, in October 2008, the appellate court reversed the dismissal.&amp;#160;&amp;#160;Thereafter, defendants appealed to the Tennessee Supreme Court which, in April 2010, reversed the appellate court ruling and dismissed all of plaintiffs&amp;#8217; claims.&amp;#160;&amp;#160;The decision is subject to appeal to the U.S. Supreme Court.&lt;/font&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;/div&gt;&lt;div style="DISPLAY: block; MARGIN-LEFT: 0pt; TEXT-INDENT: 0pt; MARGIN-RIGHT: 0pt" align="justify"&gt;&amp;#160;&lt;/div&gt;&lt;div&gt;&lt;table style="FONT-SIZE: 10pt; FONT-FAMILY: Times New Roman" cellspacing="0" cellpadding="0" width="100%"&gt;&lt;tr valign="top"&gt;&lt;td style="WIDTH: 45pt" align="right"&gt;&lt;div&gt;&lt;font style="DISPLAY: inline; FONT-SIZE: 10pt; FONT-FAMILY: Symbol, serif"&gt;&amp;#183;&amp;#160;&amp;#160;&lt;/font&gt;&lt;/div&gt;&lt;/td&gt;&lt;td&gt;&lt;div style="MARGIN-LEFT: 0pt; TEXT-INDENT: 0pt; MARGIN-RIGHT: 0pt" align="justify"&gt;&lt;font style="DISPLAY: inline; FONT-SIZE: 10pt; FONT-FAMILY: Times New Roman"&gt;In February 2008, the United States District Court in Las Vegas, Nevada granted defendants&amp;#8217; motion for summary judgment in a Colorado class action and, ultimately, dismissed the case and all of plaintiffs&amp;#8217; claims.&amp;#160;&amp;#160;The decision is subject to appeal once the remaining defendants&amp;#8217; claims are adjudicated.&lt;/font&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;/div&gt;&lt;div style="DISPLAY: block; MARGIN-LEFT: 0pt; TEXT-INDENT: 0pt; MARGIN-RIGHT: 0pt" align="justify"&gt;&amp;#160;&lt;/div&gt;&lt;div&gt;&lt;table style="FONT-SIZE: 10pt; FONT-FAMILY: Times New Roman" cellspacing="0" cellpadding="0" width="100%"&gt;&lt;tr valign="top"&gt;&lt;td style="WIDTH: 45pt" align="right"&gt;&lt;div&gt;&lt;font style="DISPLAY: inline; FONT-SIZE: 10pt; FONT-FAMILY: Symbol, serif"&gt;&amp;#183;&amp;#160;&amp;#160;&lt;/font&gt;&lt;/div&gt;&lt;/td&gt;&lt;td&gt;&lt;div style="MARGIN-LEFT: 0pt; TEXT-INDENT: 0pt; MARGIN-RIGHT: 0pt" align="justify"&gt;&lt;font style="DISPLAY: inline; FONT-SIZE: 10pt; FONT-FAMILY: Times New Roman"&gt;The remaining five cases, three of which seek class certification, are also pending in Nevada federal court.&amp;#160;&amp;#160;All of the cases contain similar claims that individually, and in conjunction with other energy companies, we engaged in an illegal scheme to inflate natural gas prices in four states by providing false information to natural gas index publications.&amp;#160;&amp;#160;In November 2009, following defendants&amp;#8217; motion for reconsideration, the court invited defendants to renew their motions for summary judgment, which were filed shortly thereafter.&amp;#160;&amp;#160;Now fully briefed, we await an order or further instruction from the court.&amp;#160;&amp;#160;In the interim, discovery and plaintiffs&amp;#8217; class certification motion are stayed.&lt;/font&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;/div&gt;&lt;div style="DISPLAY: block; TEXT-INDENT: 0pt"&gt;&lt;br /&gt;&lt;/div&gt;&lt;div style="DISPLAY: block; MARGIN-LEFT: 0pt; TEXT-INDENT: 27pt; MARGIN-RIGHT: 0pt" align="left"&gt;&lt;font style="DISPLAY: inline; FONT-SIZE: 10pt; FONT-FAMILY: Times New Roman"&gt;We continue to analyze the Gas Index Pricing Litigation and are vigorously defending the remaining individual matters.&amp;#160;&amp;#160;Due to the uncertainty of litigation, we cannot predict whether we will incur any liability in connection with these lawsuits.&amp;#160;&amp;#160;However, given the nature of the claims, an adverse result in these proceedings could have a material effect on our financial condition, results of operations and cash flows.&lt;/font&gt;&lt;/div&gt;&lt;div style="DISPLAY: block; TEXT-INDENT: 0pt"&gt;&lt;br /&gt;&lt;/div&gt;&lt;div style="DISPLAY: block; MARGIN-LEFT: 0pt; TEXT-INDENT: 27pt; MARGIN-RIGHT: 0pt" align="left"&gt;&lt;font style="DISPLAY: inline; FONT-SIZE: 10pt; FONT-FAMILY: Times New Roman"&gt;&lt;font style="DISPLAY: inline; FONT-WEIGHT: bold; FONT-STYLE: italic"&gt;Cooling Water Intake Permits.&lt;/font&gt;&amp;#160;&amp;#160;The cooling water intake structures at several of our power generation facilities are regulated under section 316(b) of the Clean Water Act.&amp;#160;&amp;#160;This provision generally requires that standards set for power generation facilities require that the location, design, construction and capacity of cooling water intake structures reflect the BTA for minimizing adverse environmental impact.&amp;#160;&amp;#160;These standards are developed and implemented for power generating facilities through the NPDES permits or individual SPDES permits on a case by case basis.&lt;/font&gt;&lt;/div&gt;&lt;div style="DISPLAY: block; TEXT-INDENT: 0pt"&gt;&lt;br /&gt;&lt;/div&gt;&lt;div style="DISPLAY: block; MARGIN-LEFT: 0pt; TEXT-INDENT: 27pt; MARGIN-RIGHT: 0pt" align="left"&gt;&lt;font style="DISPLAY: inline; FONT-SIZE: 10pt; FONT-FAMILY: Times New Roman"&gt;The environmental groups that participate in our NPDES and SPDES permit proceedings generally argue that only closed cycle cooling meets the BTA requirement.&amp;#160;&amp;#160;The issuance and renewal of NPDES or SPDES permits for three of our power generation facilities have been challenged on this basis, with two still pending.&lt;/font&gt;&lt;/div&gt;&lt;div style="DISPLAY: block; MARGIN-LEFT: 0pt; TEXT-INDENT: 0pt; MARGIN-RIGHT: 0pt" align="justify"&gt;&amp;#160;&lt;/div&gt;&lt;div&gt;&lt;table style="FONT-SIZE: 10pt; FONT-FAMILY: Times New Roman" cellspacing="0" cellpadding="0" width="100%"&gt;&lt;tr valign="top"&gt;&lt;td style="WIDTH: 45pt" align="right"&gt;&lt;div&gt;&lt;font style="DISPLAY: inline; FONT-SIZE: 10pt; FONT-FAMILY: Symbol, serif"&gt;&amp;#183;&amp;#160;&amp;#160;&lt;/font&gt;&lt;/div&gt;&lt;/td&gt;&lt;td&gt;&lt;div style="MARGIN-LEFT: 0pt; TEXT-INDENT: 0pt; MARGIN-RIGHT: 0pt" align="justify"&gt;&lt;font style="DISPLAY: inline; FONT-SIZE: 10pt; FONT-FAMILY: Times New Roman"&gt;Roseton SPDES Permit &amp;#8212; In April 2005, the NYSDEC issued a Draft SPDES Permit renewal for the Roseton plant.&amp;#160;&amp;#160;The permit is opposed by environmental groups challenging the BTA determination.&amp;#160;&amp;#160;The hearing will be scheduled after the Commissioner rules on appeals of procedural matters.&amp;#160;&amp;#160;We believe that the petitioners&amp;#8217; claims lack merit and we plan to oppose those claims vigorously.&lt;/font&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;/div&gt;&lt;div style="DISPLAY: block; MARGIN-LEFT: 0pt; TEXT-INDENT: 0pt; MARGIN-RIGHT: 0pt" align="justify"&gt;&amp;#160;&lt;/div&gt;&lt;div&gt;&lt;table style="FONT-SIZE: 10pt; FONT-FAMILY: Times New Roman" cellspacing="0" cellpadding="0" width="100%"&gt;&lt;tr valign="top"&gt;&lt;td style="WIDTH: 45pt" align="right"&gt;&lt;div&gt;&lt;font style="DISPLAY: inline; FONT-SIZE: 10pt; FONT-FAMILY: Symbol, serif"&gt;&amp;#183;&amp;#160;&amp;#160;&lt;/font&gt;&lt;/div&gt;&lt;/td&gt;&lt;td&gt;&lt;div style="MARGIN-LEFT: 0pt; TEXT-INDENT: 0pt; MARGIN-RIGHT: 0pt" align="justify"&gt;&lt;font style="DISPLAY: inline; FONT-SIZE: 10pt; FONT-FAMILY: Times New Roman"&gt;Moss Landing NPDES Permit &amp;#8212; The California Regional Water Quality Control Board (&amp;#8220;Water Board&amp;#8221;) issued an NPDES permit for the Moss Landing power generating facility in 2000 that did not require closed cycle cooling.&amp;#160;&amp;#160;A local environmental group challenged the BTA determination of the permit.&amp;#160;&amp;#160;The Water Board&amp;#8217;s decision was affirmed by the Superior Court in 2004 and by the Court of Appeals in 2007.&amp;#160;&amp;#160;The Supreme Court of California granted review in March 2008.&amp;#160;&amp;#160;The petitioner&amp;#8217;s brief was filed in December 2009.&amp;#160;&amp;#160;We filed a motion to dismiss and our responsive brief in March 2010.&amp;#160;&amp;#160;&amp;#160;The petitioner&amp;#8217;s reply brief was filed in May 2010.&amp;#160;&amp;#160;Our motion to dismiss was denied in June 2010.&amp;#160;&amp;#160;In July 2010, the California Energy Commission filed an application for leave to file a brief in support of our argument challenging the jurisdiction of the Supreme Court.&amp;#160;&amp;#160;We believe that petitioner&amp;#8217;s claims lack merit and we plan to continue to oppose those claims vigorously.&lt;/font&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;&lt;/div&gt;&lt;div style="DISPLAY: block; TEXT-INDENT: 0pt"&gt;&lt;br /&gt;&lt;/div&gt;&lt;div style="DISPLAY: block; MARGIN-LEFT: 0pt; TEXT-INDENT: 27pt; MARGIN-RIGHT: 0pt" align="left"&gt;&lt;font style="DISPLAY: inline; FONT-SIZE: 10pt; FONT-FAMILY: Times New Roman"&gt;Due to the nature of these claims, an adverse result in either of these proceedings could have a material effect on our financial condition, results of operations and cash flows.&lt;/font&gt;&lt;/div&gt;&lt;div style="DISPLAY: block; TEXT-INDENT: 0pt"&gt;&lt;br /&gt;&lt;/div&gt;&lt;div style="DISPLAY: block; MARGIN-LEFT: 0pt; TEXT-INDENT: 27pt; MARGIN-RIGHT: 0pt" align="left"&gt;&lt;font style="DISPLAY: inline; FONT-SIZE: 10pt; FONT-FAMILY: Times New Roman"&gt;&lt;font style="DISPLAY: inline; FONT-WEIGHT: bold; FONT-STYLE: italic"&gt;Native Village of Kivalina and City of Kivalina v. ExxonMobil Corporation, et al.&lt;/font&gt;&amp;#160;&amp;#160;In February 2008, the Native Village of Kivalina and the City of Kivalina, Alaska initiated an action in federal court in the Northern District of California against DHI and 23 other companies in the energy industry.&amp;#160;&amp;#160;Plaintiffs claim that defendants&amp;#8217; emissions of GHG including CO&lt;font style="DISPLAY: inline; FONT-SIZE: 70%; VERTICAL-ALIGN: sub"&gt;2&lt;/font&gt; contribute to climate change and have caused significant damage to a native Alaskan Eskimo village through increased vulnerability to waves, storm surges and erosion.&amp;#160;&amp;#160;In September 2009, the court dismissed all of the plaintiffs&amp;#8217; claims based on lack of subject matter jurisdiction and because plaintiffs lacked standing to bring the suit.&amp;#160;&amp;#160;Shortly thereafter, plaintiffs appealed to the Ninth Circuit.&amp;#160;&amp;#160;The parties have filed their initial briefs and plaintiffs&amp;#8217; reply brief is due in September 2010.&amp;#160;&amp;#160;We believe the plaintiffs&amp;#8217; suit lacks merit and we will continue to oppose their claims vigorously.&lt;/font&gt;&lt;/div&gt;&lt;div style="DISPLAY: block; TEXT-INDENT: 0pt"&gt;&lt;br /&gt;&lt;/div&gt;&lt;div style="DISPLAY: block; MARGIN-LEFT: 0pt; TEXT-INDENT: 27pt; MARGIN-RIGHT: 0pt" align="left"&gt;&lt;font style="DISPLAY: inline; FONT-SIZE: 10pt; FONT-FAMILY: Times New Roman"&gt;&lt;font style="DISPLAY: inline; FONT-WEIGHT: bold; FONT-STYLE: italic"&gt;Ordinary Course Litigation.&lt;/font&gt;&amp;#160;&amp;#160;In addition to the matters discussed above, we are party to numerous legal proceedings arising in the ordinary course of business or related to discontinued business operations.&amp;#160;&amp;#160;In management&amp;#8217;s judgment, which may prove to be materially inaccurate as indicated above, the disposition of these matters will not materially affect our financial condition, results of operations or cash flows.&lt;/font&gt;&lt;/div&gt;&lt;div style="DISPLAY: block; TEXT-INDENT: 0pt"&gt;&lt;br /&gt;&lt;/div&gt;&lt;div style="DISPLAY: block; MARGIN-LEFT: 0pt; TEXT-INDENT: 18pt; MARGIN-RIGHT: 0pt" align="left"&gt;&lt;font style="DISPLAY: inline; FONT-WEIGHT: bold; FONT-SIZE: 10pt; FONT-FAMILY: Times New Roman"&gt;Guarantees and Indemnifications&lt;/font&gt;&lt;/div&gt;&lt;div style="DISPLAY: block; TEXT-INDENT: 0pt"&gt;&lt;br /&gt;&lt;/div&gt;&lt;div style="DISPLAY: block; MARGIN-LEFT: 0pt; TEXT-INDENT: 27pt; MARGIN-RIGHT: 0pt" align="left"&gt;&lt;font style="DISPLAY: inline; FONT-SIZE: 10pt; FONT-FAMILY: Times New Roman"&gt;In the ordinary course of business, we routinely enter into contractual agreements that contain various representations, warranties, indemnifications and guarantees.&amp;#160;&amp;#160;Examples of such agreements include, but are not limited to, service agreements, equipment purchase agreements, engineering and technical service agreements, asset sales and procurement and construction contracts.&amp;#160;&amp;#160;Some agreements contain indemnities that cover the other party&amp;#8217;s negligence or limit the other party&amp;#8217;s liability with respect to third party claims, in which event we will effectively be indemnifying the other party.&amp;#160;&amp;#160;Virtually all such agreements contain representations or warranties that are covered by indemnifications against the losses incurred by the other parties in the event such representations and warranties are false.&amp;#160;&amp;#160;While there is always the possibility of a loss related to such representations, warranties, indemnifications and guarantees in our contractual agreements, and such loss could be significant, in most cases management considers the probability of loss to be remote.&amp;#160;&amp;#160;Related to the indemnifications discussed below, we have accrued an aggregate of approximately $2 million as of June 30, 2010.&lt;/font&gt;&lt;/div&gt;&lt;div style="DISPLAY: block; TEXT-INDENT: 0pt"&gt;&lt;br /&gt;&lt;/div&gt;&lt;div style="DISPLAY: block; MARGIN-LEFT: 0pt; TEXT-INDENT: 27pt; MARGIN-RIGHT: 0pt" align="left"&gt;&lt;font style="DISPLAY: inline; FONT-SIZE: 10pt; FONT-FAMILY: Times New Roman"&gt;&lt;font style="DISPLAY: inline; FONT-WEIGHT: bold; FONT-STYLE: italic"&gt;LS Power Indemnities.&lt;/font&gt;&amp;#160;&amp;#160;In connection with the LS Power Transactions we agreed in the purchase and sale agreement to indemnify LS Power against claims regarding any breaches in our representations and warranties and certain other potential liabilities.&amp;#160;&amp;#160;Claims for indemnification shall survive until twelve months subsequent to closing with exceptions for tax claims, which shall survive for the applicable statute of limitations plus 30 days, and certain other representations and potential liabilities, which shall survive indefinitely.&amp;#160;&amp;#160;The indemnifications provided to LS Power are limited to $1.3 billion in total; however, several categories of indemnifications are not available to LS Power until the liabilities incurred in the aggregate are equal to or exceed $15 million and are capped at a maximum of $100 million.&amp;#160;&amp;#160;Further, the purchase and sale agreement provides in part that we may not reduce or avoid liability for a valid claim based on a claim of contribution.&amp;#160;&amp;#160;In addition to the above indemnities related to the LS Power Transactions, we have agreed to indemnify LS Power against claims related to the Riverside/Foothills Project for certain aspects of the project.&amp;#160;&amp;#160;Namely, LS Power has been indemnified for any disputes that arise as to ownership, transfer of bonds related to the project, and any failure by us to obtain approval for the transfer of the payment in-lieu of taxes program already in place.&amp;#160;&amp;#160;The indemnities related solely to the Riverside/Foothills Project are capped at a maximum of $180 million and extend until the earlier of the expiration of the tax agreement or December 26, 2026.&amp;#160;&amp;#160;At this time, we have incurred no significant expenses under these indemnities.&lt;/font&gt;&lt;/div&gt;&lt;div style="DISPLAY: block; TEXT-INDENT: 0pt"&gt;&lt;br /&gt;&lt;/div&gt;&lt;div style="DISPLAY: block; MARGIN-LEFT: 0pt; TEXT-INDENT: 27pt; MARGIN-RIGHT: 0pt" align="left"&gt;&lt;font style="DISPLAY: inline; FONT-SIZE: 10pt; FONT-FAMILY: Times New Roman"&gt;&lt;font style="DISPLAY: inline; FONT-WEIGHT: bold; FONT-STYLE: italic"&gt;West Coast Power Indemnities.&lt;/font&gt;&amp;#160;&amp;#160;In connection with the sale of our 50 percent interest in West Coast Power to NRG on March 31, 2006, an agreement was executed to allocate responsibility for managing certain litigation and provide for certain indemnities with respect to such litigation.&amp;#160;&amp;#160;The indemnification agreement in relevant part provides that NRG assumes responsibility for all defense costs and any risk of loss, subject to certain conditions and limitations, arising from a February 2002 complaint filed at FERC by the California Public Utilities Commission alleging that several parties, including West Cost Power subsidiaries, overcharged the State of California for wholesale power.&amp;#160;&amp;#160;FERC found the rates charged by wholesale suppliers to be just and reasonable.&amp;#160;&amp;#160;However, this matter was appealed to the U.S. Supreme Court, which remanded the case to FERC for further review.&lt;/font&gt;&lt;/div&gt;&lt;div style="DISPLAY: block; TEXT-INDENT: 0pt"&gt;&lt;font style="DISPLAY: inline; FONT-SIZE: 10pt; FONT-FAMILY: Times New Roman"&gt;&lt;/font&gt;&amp;#160;&lt;/div&gt;&lt;div style="DISPLAY: block; MARGIN-LEFT: 0pt; TEXT-INDENT: 27pt; MARGIN-RIGHT: 0pt" align="left"&gt;&lt;font style="DISPLAY: inline; FONT-SIZE: 10pt; FONT-FAMILY: Times New Roman"&gt;&lt;font style="DISPLAY: inline; FONT-WEIGHT: bold; FONT-STYLE: italic"&gt;Targa Indemnities.&lt;/font&gt;&amp;#160;&amp;#160;During 2005, as part of our sale of our midstream business (&amp;#8220;DMSLP&amp;#8221;), we agreed to indemnify Targa Resources, Inc. (&amp;#8220;Targa&amp;#8221;) against losses it may incur under indemnifications DMSLP provided to purchasers of certain assets, properties and businesses disposed of by DMSLP prior to our sale of DMSLP.&amp;#160;&amp;#160;We have incurred no material expense under these prior indemnities.&amp;#160;&amp;#160;We have recorded an accrual in association with the remediation of groundwater contamination at the Breckenridge Gas Processing Plant.&amp;#160;&amp;#160;The indemnification provided by DMSLP to the purchaser of the plant has a limit of $5 million.&amp;#160;&amp;#160;We have also indemnified Targa for certain tax matters arising from periods prior to our sale of DMSLP.&amp;#160;&amp;#160;We have recorded a tax reserve associated with this indemnification.&lt;/font&gt;&lt;/div&gt;&lt;div style="DISPLAY: block; TEXT-INDENT: 0pt"&gt;&lt;br /&gt;&lt;/div&gt;&lt;div style="DISPLAY: block; MARGIN-LEFT: 0pt; TEXT-INDENT: 27pt; MARGIN-RIGHT: 0pt" align="left"&gt;&lt;font style="DISPLAY: inline; FONT-SIZE: 10pt; FONT-FAMILY: Times New Roman"&gt;&lt;font style="DISPLAY: inline; FONT-WEIGHT: bold; FONT-STYLE: italic"&gt;Illinois Power Indemnities.&lt;/font&gt;&amp;#160;&amp;#160;Dynegy has indemnified third parties against losses resulting from possible adverse regulatory actions taken by the ICC that could prevent Illinois Power from recovering costs incurred in connection with purchased natural gas and investments in specified items.&amp;#160;&amp;#160;Although there is no absolute limitation on Dynegy&amp;#8217;s liability under this indemnity, the amount of the indemnity is limited to 50 percent of any such losses.&amp;#160;&amp;#160;Dynegy has made certain payments in respect of these indemnities following regulatory action by the ICC, and has established reserves for further potential indemnity claims.&amp;#160;&amp;#160;Further events, which fall within the scope of the indemnity, may still occur.&amp;#160;&amp;#160;However, Dynegy is not required to accrue a liability in connection with these indemnifications, as management cannot reasonably estimate a range of outcomes or at this time considers the probability of an adverse outcome as only reasonably possible.&amp;#160;&amp;#160;Dynegy intends to contest any proposed regulatory actions.&lt;/font&gt;&lt;/div&gt;&lt;div style="DISPLAY: block; TEXT-INDENT: 0pt"&gt;&lt;br /&gt;&lt;/div&gt;&lt;div style="DISPLAY: block; MARGIN-LEFT: 0pt; TEXT-INDENT: 27pt; MARGIN-RIGHT: 0pt" align="left"&gt;&lt;font style="DISPLAY: inline; FONT-SIZE: 10pt; FONT-FAMILY: Times New Roman"&gt;&lt;font style="DISPLAY: inline; FONT-WEIGHT: bold; FONT-STYLE: italic"&gt;Black Mountain Guarantee.&lt;/font&gt;&amp;#160;&amp;#160;Through one of our subsidiaries, we hold a 50% ownership interest in Black Mountain (Nevada Cogeneration) (&amp;#8220;Black Mountain&amp;#8221;), in which our partner is a Chevron subsidiary.&amp;#160;&amp;#160;Black Mountain owns the Black Mountain power generation facility and has a power purchase agreement with a third party that extends through April 2023.&amp;#160;&amp;#160;In connection with the power purchase agreement, pursuant to which Black Mountain receives payments which decrease in amount over time, we agreed to guarantee 50 percent of certain payments that may be due to the power purchaser under a mechanism designed to protect it from early termination of the agreement.&amp;#160;&amp;#160;At June 30, 2010, if an event of default due to early termination had occurred under the terms of the mortgage on the facility entered into in connection with the power purchase agreement, we could have been required to pay the power purchaser approximately $55 million under the guarantee.&lt;/font&gt;&lt;/div&gt;&lt;div style="DISPLAY: block; TEXT-INDENT: 0pt"&gt;&lt;br /&gt;&lt;/div&gt;&lt;div style="DISPLAY: block; MARGIN-LEFT: 0pt; TEXT-INDENT: 27pt; MARGIN-RIGHT: 0pt" align="left"&gt;&lt;font style="DISPLAY: inline; FONT-SIZE: 10pt; FONT-FAMILY: Times New Roman"&gt;&lt;font style="DISPLAY: inline; FONT-WEIGHT: bold; FONT-STYLE: italic"&gt;Other Indemnities.&lt;/font&gt;&amp;#160;&amp;#160;We entered into indemnifications regarding environmental, tax, employee and other representations when completing asset sales such as, but not limited, to the Rolling Hills, Calcasieu, CoGen Lyondell and Heard County power generating facilities.&amp;#160;&amp;#160;As of June 30, 2010, no claims have been made against these indemnities.&amp;#160;&amp;#160;There is no limitation on our liability under certain of these indemnities.&amp;#160;&amp;#160;However, management is unaware of any existing claims.&lt;/font&gt;&lt;/div&gt;</NonNumbericText>
          <NonNumericTextHeader>Note 12&amp;#8212;Commitments and ContingenciesLegal ProceedingsSet forth below is a summary of our material ongoing legal proceedings.&amp;#160;&amp;#160;We record</NonNumericTextHeader>
          <FootnoteIndexer />
          <hasSegments>false</hasSegments>
          <hasScenarios>false</hasScenarios>
          <DisplayDateInUSFormat>false</DisplayDateInUSFormat>
        </Cell>
      </Cells>
      <OriginalInstanceReportColumns />
      <ElementDataType>us-types:textBlockItemType</ElementDataType>
      <SimpleDataType>textblock</SimpleDataType>
      <ElementDefenition>Includes disclosure of commitments and contingencies. This element may be used as a single block of text to encapsulate the entire disclosure including data and tables.</ElementDefenition>
      <ElementReferences>Reference 1: http://www.xbrl.org/2003/role/presentationRef
 -Publisher FASB
 -Name FASB Interpretation (FIN)
 -Number 14
 -Paragraph 3

Reference 2: http://www.xbrl.org/2003/role/presentationRef
 -Publisher FASB
 -Name Statement of Financial Accounting Standard (FAS)
 -Number 5
 -Paragraph 9, 10, 11, 12

</ElementReferences>
      <IsTotalLabel>false</IsTotalLabel>
    </Row>
  </Rows>
  <Footnotes />
  <NumberOfCols>1</NumberOfCols>
  <NumberOfRows>2</NumberOfRows>
  <HasScenarios>false</HasScenarios>
  <MonetaryRoundingLevel>UnKnown</MonetaryRoundingLevel>
  <SharesRoundingLevel>UnKnown</SharesRoundingLevel>
  <PerShareRoundingLevel>UnKnown</PerShareRoundingLevel>
  <HasPureData>false</HasPureData>
  <SharesShouldBeRounded>true</SharesShouldBeRounded>
</InstanceReport>
