EX-99.1 2 exh99_1.htm TECHNICAL REPORT (NI 43-101) exh99_1.htm


Exhibit 99.1
 
 


Graphic








 

National Instrument 43-101
Independent Technical Report
for
Asanko Gold Incorporated's
Pre-Feasibility Study
on
the Esaase Gold Project
in Ghana



 
A.N.Clay
M.Sc. (Geol.), M.Sc. (Min. Eng.), Dip. Bus. M.
Pr Sci Nat, MSAIMM, FAusIMM, FGSSA, MAIMA,
M.Inst.D, AAPG
Qualified Person
 
   
G. Bezuidenhout
N.D.T. Ex. Met
FSIAMM
Qualified Person
F. Coetzee
B.Sc.Hons (Environmental Management)
Pr Sci Nat (400440/04)
Qualified Person
   
C. Muller
B.Sc.Hons (Geol.)
Pr Sci Nat
Qualified Person
G. Wiid
MSc Eng (Civil)
Pr Eng; MSAIMM
Qualified Person
   
T. Obriri-Yeboah
BSc./Post Graduate Diploma Mining Engineering
Pr ECSA, MSAIMM
Qualified Person
D. Heher
B.Sc. (Mechanical Engineering.)
Pr. Eng;
Qualified Person
   
Reference No:- D1237 VDM 4
Effective Date:- 14 May 2013
 
 
 
 

 
 
 June 2013   i
 
National Instrument 43-101 Independent Technical
Report for Asanko Gold Incorporated's
Pre-Feasibility Study
on the
Esaase Gold Project in Ghana

 
Synopsis
NI 43-101 Item 1
Venmyn Deloitte (Proprietary) Limited (Venmyn Deloitte) was requested by DRA Minerals Projects (DRA), on behalf of Asanko Gold Incorporated (Asanko Gold), to prepare an Independent Technical Report (ITR) on the results of an new Preliminary Feasibility Study (PFS) on the Esaase Gold Project (Esaase Project or the Project) in Ghana, West Africa.

Asanko Gold is a Toronto Stock Exchange (TSX) and New York Stock Exchange (NYSE) listed junior gold development company with two gold assets in Ghana, namely the Esaase and Asumura Projects, held by Keegan Resources Ghana Inc (Keegan Resources). Asanko Gold is a well-financed Canadian exploration and development company, strategically focused on near term gold production.

Property Description and Terms of Reference
 
The Esaase Project is an advanced gold exploration project at the point of conversion to a development project. The Project has been the subject of several historic technical studies and two prior economic studies, the results of which are available in the public domain. A Preliminary Economic Analysis (PEA) was completed in May 2010 and a PFS by Lycopodium Minerals Proprietary Limited (Lycopodium) was published in September 2011 in the form of a Canadian National Instrument 43-101 ITR by Coffey Mining Limited (Coffey Mining). The 2011 PFS provided Mineral Resource estimations reported in compliance with NI 43-101 and "Joint Ore Reserves Committee" (JORC) ("Australasian Code for Reporting of Exploration Results, Mineral Resource and Ore Reserves") codes. In addition, the 2011 PFS investigated capital and operational costs for an open pit mine, concentrator and whole-ore leach processing plant.

Asanko Gold made the strategic decision in June 2012 to defer the completion of a Definitive Feasibility Study (DFS) based on the 2011 PFS scope and to instead undertake a re-scoped PFS. In August 2012, Asanko Gold completed a Concept Study with the revised project scope and in September 2012 appointed DRA to undertake the new PFS (2013 PFS). The 2013 PFS would permit the publication of an updated 2012 Mineral Resource and Mineral Reserve estimate, a new mine design based on the new resource estimate with the specific focus on the feasibility and optimisation of a new process flow design. Re-estimation of the capital, and operational costs, at current gold market conditions would be undertaken.

The purpose of this ITR therefore will be to summarise and document the results of the 2013 PFS in terms of technical parameters, Mineral Resources and Mineral Reserves, new mine and infrastructure design, re-designed and improved process flow, environmental review and economic analysis of the Esaase Project in a manner fully compliant with the requirements of:-

  • the Canadian National Instrument 43-101 Standards for Disclosure for Mineral Projects (Form 43-101F1) and the Companion Policy Document 43-101CP (NI 43-101);
  • the disclosure and reporting requirements of the TSX as stipulated in the 2007 TSX Company Manual;
  • the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Definition Standards (2005); and
  • CIMVAL Standards and Guidelines for Valuation of Mineral Properties (2003).
Graphic
 
 

 
 
 June 2013   ii
 
Esaase Project PFS Concept

The 2011 PFS was based on an open pit mining methodology with a "whole-ore" leach processing plant. The study included an unlined Tailings Storage Facility (TSF) with initial mill throughputs of 9 million tonnes per annum (Mtpa), reducing to 7.5Mtpa once mining exploited fresh rather than oxide/transition zone material. The 2011 PFS resulted in a positive Net Present Value (NPV) for the Project but additional studies indicated that better economic outcomes could be achieved with alternative processing methodologies.

The re-scoped 2013 PFS would permit the following changes to the original 2011 PFS:-

  • incorporation of the updated 2012 Mineral Resource and Mineral Reserve estimate which includes increased resources in the Indicated category and new Measured Mineral Resources;
  • the 2012 Mineral Resource estimate would support a new optimised mine design based on the new resource estimate;
  • the feasibility and economics of a gravity-flotation-carbon-in-leach (CIL) plant could be investigated;
  • the process plant could be designed to a target throughput of 5Mtpa run-of-mine (RoM);
  • optimisation of the proposed mine layout could be achieved in order to efficiently accommodate the required infrastructure including waste rock dumps, buffer dam and tailings storage facilities (TSFs);
  • optimisation of the power supply could be undertaken; 
  • a target life-of-mine (LoM) of at least 10years with an average gold production of 200,000oz per annum (ozpa) could be achieved; and 
  • the 2013 PFS would specifically focus on the capital and operational costs at 2013 gold market conditions.
The various PFS component studies were undertaken by numerous independent specialist consultants. Each consultancy provided teams of technical advisors, with an overall Qualified Person in terms of NI 43-101 definitions, who has signed-off the appropriate sections of the ITR. Venmyn Deloitte has undertaken independent reviews of the processing and environmental studies and has reviewed at a high level all the sections of the ITR. The results of the specialist studies conducted for the 2013 PFS on the Esaase Project have been incorporated into an economic analysis of the Project and the following summary, conclusions and interpretations were highlighted in the review.

Property Location, Ownership and Legal Tenure
 
The Esaase Project is located in southwest Ghana in West Africa within the Amansie West District of the Ashanti Region, approximately 35km southwest of the regional capital Kumasi. The Esaase Project comprises two contiguous mining leases (the Jeni and Esaase mining leases) and four prospecting licences that cumulatively cover an area of approximately 99.10km2 in the prospective gold mining Ashanti region. The Esaase and Jeni concessions contain alluvial gold deposits in the Bonte River valley which have been exploited historically by artisanal miners. The Esaase Project however, is focussed on the primary host Birimian aged (2.17Ga) meta-sediments and not on evaluation of the alluvial deposits.

The Jeni River and Esaase mining leases were originally granted in March 1990 to the Jeni River Development Company Limited and to Bonte Gold Mines Limited respectively. Both of these companies filed for bankruptcy in 2002 and the Esaase mining lease was acquired from the Bonte Liquidation Committee by Sametro Company Limited, a private Ghanaian company. Asanko Gold entered into an agreement with Sametro in May 2006 to earn 100% of the mineral right and transfer of the Esaase mining lease to Asanko Gold was completed in June 2007.

The mining leases are valid until 2020 and can be renewed for an additional thirty year period. The mining leases permit Asanko Gold to undertake mining activities provided certain conditions and fee payments are maintained with the Ministry of Lands, Forestry and Mines;.

Geology and Mineralisation
The Esaase Project is located in the Archaean (Birimian aged) Asankrangwa Belt within the Kumasi Basin. World renowned gold mines such as AngloGold Ashanti Limiteds Obuasi deposit, which began production in 1898, are located in the neighbouring Ashanti and Sefwi belts. Similar vein deposits in the Ashanti belt, such as Prestea and Konongo, have robust production histories.
 
Graphic
 
 

 
 
 June 2013  iii

The gold quartz vein mineralisation in these deposits is structurally controlled along faults and shear zones resulting from compressional tectonic episodes, particularly along the margins of greenstone belts such as the Ashanti and Sefwi Belts.

The target Esaase Project mineralisation is classified as a mesothermal orogenic quartz vein deposit. Such mesothermal orogenic deposits are associated with Precambrian and Phanerozoic convergent plate boundaries and are hosted in sequences generally metamorphosed to greenschist facies. The Esaase Project area comprises a sequence of intensely folded and faulted meta-sediments and the mineralisation comprises a system of gold-bearing quartz veins hosted by the tightly folded meta-sediments.

The mineralisation is considered to have been produced by a series of fluid influxes which were channelled along lithological, rheological and structural boundaries. The target gold mineralisation comprises free gold and very fine grained gold in association with sulphides in quartz-carbonate-sulphide veins hosted within parallel, northeast trending, moderately to steeply, west dipping units of extremely deformed siltstone/shale.

The Esaase Project mineralisation is structurally controlled by Eburnean age compressional tectonic events which produced fold-thrust patterning followed by a late stage strike-slip deformation event. The deformational intensity increases systematically from the northwest to the southeast across the Project area. The regional structural synthesis suggests that most of the structural elements are compatible with a single, extended and progressive phase of regional deformation involving substantial northwest-southeast compression. Towards the close of the tectonic event, the stress direction changed from northeast-southwest to north-south. The change in stress direction caused left lateral strike-slip movement along pre-existing faults which created a northsouth dilational opening permitting the emplacement of late stage non-mineralised northsouth oriented veins.

The weathering profile on the Esaase Property is strongly influenced by topography and influences the proposed mine site layout and mining methodology. The weathered profile generally comprises surface laterite and ferruginous duricrust, followed by saprolite, which gradationally merges with oxidised bedrock. In regions of higher elevation at the Esaase Project, the laterite and underlying saprolite have been removed by erosional processes so that only the oxidised bedrock remains which provides adequate conditions for foundation and construction stability.

Exploration Concept and Status
 
Since mid-2006, Asanko Gold through its subsidiary Keegan Resources Ghana Limited (Keegan Resources) has undertaken an extensive exploration programme combining soil geochemistry, Induced Polarisation (IP) resistivity and Versatile Time Domain Electromagnetic (VTEM) geophysical surveys, followed by diamond and reverse circulation exploration and resource drilling. The geophysical surveys delineated the resistivity of the host and bedrock at Esaase Project and the >6,100 soil sample geochemistry programme clearly supports the mineralisation model of parallel northwest trending mineralised structures.

The drilling programme focused mainly on the northwest striking gold bearing structures and a total of 1,496 reverse circulation (RC) and diamond drillholes were completed on the Project area. A geotechnical drilling programme of 28 diamond drillholes was also completed. Sample recovery from the drilling programme was generally acceptable except in the moderate to highly weathered saprolite and highly fractured/brecciated zones but recovery factors are unlikely to materially affect the accuracy and reliability of the sampling results. Quality control and twin drillhole verification showed no negative bias in the diamond drilling due to the use of water. Reviews of the drilling and sampling protocols by independent Qualified Persons from Coffey Mining and Minxcon provide confidence that the data is spatially well represented and that the methodologies employed are within international standards and the resultant information is suitable for Mineral resource estimation purposes.

Suitable specific gravity measurements were undertaken to support the Mineral Resource estimation process. Assay sample preparation and analysis was undertaken in three independent internationally accredited laboratories and a single umpire laboratory. Field and laboratory Quality Assurance/Quality Control (QA/QC) measures to monitor accuracy, contamination, precision and accuracy are appropriate for the style of mineralisation. Detailed analysis of the quality control data was undertaken by Coffey Mining and Minxcon with the concluding opinion that the Esaase Project quality control and assurance is adequate and within international standards.

Mineral Resource and Mineral Reserve Estimates
 
Minxcon (Pty) Limited (Minxcon) conducted the 2013 PFS Mineral Resource estimate on a refined block model utilising existing data with an additional 19,598 assay results to more precisely delineate the mineralised zones within the resource area.
 
Graphic
 
 

 
 
 June 2013   iv

Grade estimation was undertaken using Ordinary Kriging, with Indicator Kriging chosen to delineate the areas with continuous grade. Mineralised domains were defined and modelled on an approximate lower cut-off grade of 0.3g/t. A total of 46 zones, including waste, were identified and included in the statistical analysis and resource estimation. Outlier analysis and variogram determinations were undertaken and the final NI 43-101 compliant Mineral Resource (June 2013) estimate at a 0.6g/t cut-off grade is:-

  • Measured Mineral Resources of 23.4Mt at a grade of 1.49g/t Au for 1.12Moz contained gold;
  • Indicated Mineral Resources of 71.3Mt at a grade of 1.44g/t Au for 3.29Moz contained gold;
  • Total Measured plus Indicated Mineral Resources of 94.6Mt at a grade of 1.45g/t Au for 4.41Moz contained gold; and
  • Inferred Mineral Resources of 33.6Mt at a grade of 1.40g/t Au for 1.51Moz contained gold.
The Mineral Reserve estimate was based on the 2013 PFS mining study at a cut-off grade of 0.6g/t Au, a USD1,400/oz gold price and a mining recovery of 97%. Gold resources which occur in satellite pits and which are currently deemed uneconomic to extract were excluded from Mineral Reserve estimate, together with Mineral Resources which are affected by permitting, environmental, logistic and socio-political issues such as proximity to villages or forest reserves.
The 2013 PFS Mineral Reserve estimate is

  • Proven Mineral Reserves of 22.9Mt at a grade of 1.43g/t Au for 1.05Moz contained gold;
  • Probable Mineral Reserves of 29.5Mt at 1.40g/t Au for 1.32Moz contained gold; and
  • Total Proven and Probable Reserves of 52.34Mt at a grade of 1.41g/t Au for 2.37Moz contained gold.
Mining Study
 
DRA Mining (Pty) Limited (DRAM) undertook the mining study for the 2013 PFS, which included mine design on Indicated and Measured Mineral Resources only, pit optimisation, mine production and scheduling and costing. The appropriate mining methodology for the Esaase Project comprises conventional open pit drill and blast mining, followed by load and haul to various stockpiles. The drilling and blasting would be performed on benches between 10m and 20m in height and total material movement over the 11yr LoM is estimated between 30Mtpa and 35Mtpa. For the purpose of the 2013 PFS, Asanko Gold opted for the mining study to be conducted on a contract mining basis. The mining costs for the optimisation study were based on a mining operational cost of USD3.23/t obtained by combining DRAs database of costs, for similar operations and average costs from contractor mining quotes from the 2011 PFS, escalated for inflation. As the PFS progressed and more detail became available, the costs were optimised and refined but these optimisations will be included in the DFS.

Geotechnical studies confirmed slope angles of 52° in fresh material and 35 in oxide material. Pit optimisation produced a main pit with various satellite pits but only the Main Pit and South Pit were included in the mining study. A series of pits shells were generated at a range of cut-off grades with Whittle Pit financial optimiser to isolate the optimum mine plan for the Project. Once the optimal Whittle shell was selected, detailed mine designs, waste dump designs and LoM mining schedules were then completed using Studio 5 Planner and EPS Scheduling to determine the optimal long term mine plan.

The selected pit shell reaches fulfils the Asanko Gold criteria for the average RoM grade and LoM. The pit shell extends to a depth of -19mamsl, or approximately 290m below the Bonte river valley surface and contains 52.34Mt RoM at 1.4g/t Au for 2,37Moz of gold. A total of 224Mt of waste are contained within the pit, equating to a waste to ore stripping ratio of 4.28. A pit dewatering programme has been designed and grade control planning is essential. Bench and face mapping, for grade control as well as for geotechnical reasons, will be a routine task in finalising the ore and waste blocks to be marked out for excavation.

The mine plan includes pre-production stripping and waste provision for starter dams. Thereafter, the Main Pit remains the principal source of RoM, with South Pit contributing, on average, a third (±31%) of the overall tonnes mined for the first four years until its mined out and ready to be backfilled. The mine site plan was optimised during the 2013 PFS and the final plan includes the free blast zone, various waste dumps, two TSFs located in a valley to the west of the Main Pit, a plant site in an elevated valley west of the Main Pit, contractor miner camp near the Bonte River and an upgraded and relocated public road.
 
Graphic
 
 

 
 
 June 2013   v
 
Metallurgical Testwork and Process Design

The 2011 PFS for the Esaase Project was based on an open pit mining methodology with an associated "whole-ore" leach processing plant. The 2013 PFS was initiated with a revised scope which included investigation of a conventional crushing, milling and gravity recovery plant, followed by flotation, with the flotation concentrate being reground and then leached in a standard CIL circuit using AARL elution technology.

Under the supervision of Lycopodium in Australia four extensive phases of metallurgical testwork were completed for the 2011 PFS and DRA undertook a Phase V testwork programme in 2012 to support the new process design. The final process recommended by DRA comprises:-

  • an open circuit primary and secondary crushing followed by run-of-mine ball milling. The mill will operate in closed circuit with a cluster of cyclones to produce a p80 (80% passing) grind of 75µm;
  • a primary gravity recovery from the mill circuit comprising two independent 400t/h Knelson concentrators with the gravity concentrate reporting to a high intensity batch dissolution reactor;
  • a flotation circuit from the mill circuit, comprises a single bank of seven 130m3 rougher cells in series. with regrind and secondary gravity recovery of the flotation concentrate;
  • a CIL recovery circuit comprising seven 330m3 tanks in series with cyanide detoxification and arsenic removal circuits to produce a tailings stream with <1.0ppm As in solution; and
  • the pregnant solution from the intensive leach reactor and the eluate solution stripped from the loaded carbon in the CIL circuit will pass through the electrowinning circuit and the resultant gold sludge washed, dried and smelted into dore bars for transfer to Rand Refineries.
Trade-off comparisons in the metallurgical testwork showed that the performance of a flotation circuit gave similar LoM recoveries as a "whole-ore" leach circuit but at significantly lower operating costs. Testwork results indicated an optimal grind size of 75µm with a LoM recovery of 90.06%. The recoveries include a 1.09% recovery discount over to allow for practical processing limitations in a full-scale operating plant environment.

The final design has the benefit that the flotation tailings, comprising approximately 85% to 90% of the feed, are benign and can be disposed to a non-HDPE lined waste TSF, whilst the CIL and downstream plants can be downsized accordingly.
 
Esaase Proposed Mine Infrastructure
 
Two options exist for the power supply to the proposed Esaase mine, namely an off-grid connection to the national state utility company Gridco or an Independent Power Producer (IPP) option. The Ghanaian utility company, GridCo can supply 34MW at a total cost of USD32m, which maybe significantly reduced due to a redesign of the connection by placing a new 161kV substation on the main line and utilising a single 11km 161kV overhead line to feed the mine. The costs of the Gridco option for power supply to the proposed Esaase mine are high and Asanko Gold is investigating various alternative options. A quotation from an American based company, USP&E Global, for a dual diesel/heavy fuel oil power plant has been obtained which indicates a capital expenditure of USD22.5m (excluding reticulation and instrumentation) will be required with an operating cost of USD0.15/kWh.

The initial Project start-up water requirement of 1.4Mm3 will be sourced from the Mpatoam weir and Bonte river in the wet season and stored initially in the empty CIL Leach Tailings Storage Facility (L-TSF). Potable water demand during construction and steady state production will reach a maximum of 168m3 per day to be supplied by two boreholes. The water balance model is based on a closed circuit for beneficiation process water and the TSFs, with make-up water supply from pit dewatering and abstraction of water from the Bonte river at the beginning of the wet season.

A process water buffer dam has been designed to capture any contaminated process water that cannot be discharged. The Esaase mine will eventually be a net water positive situation and at steady state production, the total water in slurry discharged to the mine residue disposal facilities will be 920m3/hr of which 60% to 90% is returned to the plant process water circuit.

The surface water management system for the Project will consist of two separate systems namely, a clean water diversion system to control the uncontaminated run-off from the higher lying natural environment, and a dirty storm water system to capture the contaminated storm water from plant, operational and processing areas.
 
Graphic
 
 

 
 
 June 2013   vi
 
The design of the mine residue disposal facilities for the 2013 PFS was undertaken by independent design specialists Epoch Resources Pty Limited and included two facilities namely a clay lined storage facility for the tailings arising from the gravity-flotation circuit of the beneficiation plant (F-TSF) and a HDPE lined facility designed to accommodate the tailings from the CIL circuits of the process plant (L-TSF).

The 196.2ha F-TSF comprises an in situ clay compacted, fully-contained, valley dam, ring-dyke facility catering for a depositional tonnage rate of 4.5Mtpa over a 11 year LoM to be constructed out of waste rock in four, phased, wall raises to a maximum height of 65.0m. The facility to accommodate the tailings arising from the CIL circuit comprises a heavy duty polyethylene (HDPE) lined, fully-contained, valley dam L-TSF catering for a depositional tonnage rate of 0.5Mtpa over a 11 year LoM. The embankment is to be constructed out of waste rock in two, phased, downstream wall raises to a maximum height of 42.4m.

The designs and costings of the mine infrastructure have been completed to PFS levels of accuracy and include haul roads, mine accommodation buildings, contractor miner camp and other required structures. The various costings of the infrastructure have been included in the overall capital cost estimate.
 
Environmental and Social Study

The environmental and social pre-feasibility study was undertaken by an independent consultant, Epoch Resources (Pty) Limited and reviewed by Venmyn Deloitte. The study results indicate that in the context of the specifications of Ghanaian legislative requirements, and internationally accepted standards of practice, including the Equator Principles and IFC Performance Standards, the environmental aspects of the Project PFS have been acceptable at this stage of project development. The Equator Principle Finance Institutes would categorise the Esaase Project as a Category A project. Formal consultation and stakeholder engagement regarding the Project have been on-going since 2007 and extensive baseline environment studies have been completed in key areas including climate, air quality, visual and noise impact, hydrology and hydrogeology, biodiversity, cultural and archaeological, as well as socio-economic.

Key areas of potential environmental impact have been identified and measures to mitigate these risks are to be assessed in the DFS and the Environmental Impact Assessment (EIA) process. Critical authorisations that are required for the development of the proposed Esaase mine include various water use licences in terms of the Water Resources Commission and an approved Environmental Impact Statement (EIS). The EIS to be submitted in July 2013 to the Environmental Protection Agency (EPA) for approval of the mining permit and the issue of the required environmental permit, will be in compliance with the Environmental Protection Agency Act (1994) and the Environmental Assessment regulations (1999).

A conceptual rehabilitation and mine closure plan for the proposed Esaase mine and its associated infrastructure was undertaken. An estimate of the required financial provision is USD30.01m including on-going re-habilitation and aftercare.

Esaase Project Capital and Operational Expenditure Estimates
 
The Esaase Project capital expenditure estimation (excluding escalation) is derived from the studies on mining, processing, mine infrastructure, TSF designs, dam construction, electrical supply, owners costs and indirect costs. The capital costs for the mining operation, process plant and TSFs. The total initial capital cost estimate is USD260.50m, which increases to USD286.50m including a 10% contingency allowance as summarised below:-
 
CAPEX
 
COST (USDm)
Initial
Plant including EPCM
93.2
Infrastructure including mining
111.00
Indirect costs
53.6
Sub-total
260.5
Contingency
26.00
Total initial capital
 
286.5
Deferred capital
 
12.95
Sustaining capital
 
51.90
Closure capital
 
29.60
 
The process and mining capex estimates are USD82,9m (excluding EPCM and contingency) and USD13.7m respectively. The initial capital cost estimate for the mine residue disposal facilities is USD34.4m and a total of USD78.86m over the LoM.
Graphic 
 
 

 
 
 June 2013   iv

The operating cost estimates were developed from each of the Project component studies and include mine design criteria, process flow sheet, plant consumable studies, mass and water balance, mechanical and electrical equipment lists, and in-country labour cost data. The average LoM cash operating cost is estimated at USD736/oz Au based on the treatment of 5Mtpa producing an average of 200,000oz/a based on power costs of USD0.15/kWh.The mining opex for ore is USD4.64/t RoM, with USD12.24/t applicable to the waste mining. The process opex is USD10.37/t RoM and the general and administration costs are USD2.53/t as summarised in the table below. The resultant total cash operating cost (excluding royalties) is USD30.00/t milled.

Summary Operational Expenditure
 
PROJECT COMPONENT DESCRIPTION
OPEX (USD/oz Au)
OPEX (USD/tonne milled)
Waste mining
300.26
*12.24
Ore mining
113.84
4.64
Processing
254.19
10.37
General and administrative
62.14
2.53
Refining
5.35
0.22
Total cash operating costs
735.78
30.00
Royalties
77
3.14
Total cash costs
812.78
33.14
Sustaining and deferred capex
30.36
1.24
Pre-tax sustaining cash cost
843.14
34.38
Taxation
146.71
5.99
Post tax inclusive sustaining cash cost
989.85
40.37
Source : DRA 2013
*Applying the LoM stripping ratio of 4.28

Economic Analysis
 
Venmyn Deloitte constructed a Discounted Cash Flow (DCF) model for the purposes of the economic analysis of the Esaase Project at a gold price of USD1,400/oz Au. The DCF model was constructed in Excel and was based on input assumptions generated from the 2013 PFS mining schedule, processing schedule, operating costs and capital expenditure estimates. Venmyn Deloitte received input from DRA and Asanko Gold on the timing of the various inputs, including working capital requirements. The DCF model assesses the post-tax real cash flows for the Project at a 5% real discount rate. The economic analysis indicates a positive Net Present Value (NPV) of the Esaase Project of USD354.7m with a post-tax IRR of 23.2% at a gold price of USD1,400 for a 5% real discount rate. The payback period is 3.8 years from first production (commissioning). The Project NPV at various gold prices and discount rates are summarised as follows:-

Summary Economic Analysis of the Esaase Project at Various Discount Rates and Gold Prices
 
GOLD
         
IRR
PRICE
PROJECT NPV (USDm) at various discount rates (%)
( %)
( USD/oz)
           
 
3%
5%
6%
7%
8%
 
1,100
95.07
50.75
31.24
13.29
-3.27
7.8
1,200
209.73
155.14
131.03
108.77
88.20
13.4
1,300
321.08
255.51
226.50
199.70
174.91
18.5
1,400
431.50
354.71
320.71
289.27
260.17
23.2
1,500
541.65
453.58
414.55
378.45
345.02
27.6
1,600
651.61
552.19
508.10
467.31
429.53
31.7
1,700
761.53
650.77
601.62
556.15
514.01
35.8
 
The Project NPVs generated from the DCF model proved to be most sensitive to changes in parameters affecting revenue. A 10% change in revenue changes the NPV by 39.1%. The NPV is less sensitive to changes in operating expenditure (opex) with a 10% change in opex translating into a 21.9% change in the NPV. A 10% change in capital expenditure changes the NPV by 17.4%.

Esaase Project Risk Assessment
 
The development of any mining operation entails risks associated with geological confidence, grade and operational parameters but these risks are inherent in all advanced exploration and development mining projects. The specific risk assessment of the Esaase Project identified 83 risks, of which 2 are extremely high, 44 high, 31 moderate and 6 low to very low. At the current project study stage these risks are without mitigating controls. The DFS will address the risks and with mitigating controls, the risks are likely to be reduced.
 
Graphic 
 
 

 
 
 June 2013   viii
 
The two extremely high risks relate to the haul roads cross-over public roads at level crossings. These risks will require appropriate controls in order to decrease them to appropriate levels. Delays in attaining an environmental permit and appropriate water use licences pose a risk to timelines and cost of capital.

Esaase Project Execution Plan
 
The 2013 PFS included a full project execution plan which will be undertaken and managed by DRA. Front-end engineering and early work on site is scheduled for the start of the dry-season in November 2013 and main construction is planned to begin in March 2014. The construction schedule is 18 months with first gold produced in H1 2015 and steady-state production in H2 2015.

Concluding Remarks
 
Venmyn Deloitte concludes that the 2013 PFS has fulfilled its scope of optimising the process flow design, improving project economics and has succeeded in providing a robust basis for the DFS going forward. The Mineral Resource and Reserve basis is founded in international standard exploration and analytical results and the process flow design is based on reasonable and appropriate metallurgical testwork. The mine design has already identified optimisation opportunities for the DFS which provides positive upside potential for the Project. No environmental or risk factors that cannot be mitigated have been identified and the Project site layout plan adequately accommodates all Project components without impacting areas of environmental sensitivity. The economic analysis shows that the Esaase Project is robust, with an attractive positive NPV even at gold prices less than the current June gold spot price of USD1,379/oz.

Recommendations
 
The Venmyn Deloitte review of the 2013 PFS for the Esaase Project has highlighted that the Project is robust and economically viable and Venmyn Deloitte concurs with Asanko Golds decision to progress the Project to the DFS level of investigation. Several opportunities exist to improve upon the economic results of the 2013 PFS which should be investigated in the DFS, namely:-

  • a metallurgical testwork program focusing on the optimisation of the flotation reagent suite which could result in the reduction of the concentrate mass pull through the float plant to further optimise the process flow sheet and associated costs;
  • a detailed mine design using the PFS developed modifying factors to improve the conversion of Mineral Resources to Mineral Reserves;
  • a detailed mine design reflecting higher mining and processing rates whilst treating softer oxide RoM in the early years of the Project LoM; and
  • further geotechnical engineering studies to determine if steeper pit slope angles can be introduced into the design of the open pit.
The metallurgical testwork can commence immediately on the remaining material from the previous metallurgical testwork programme. The detailed mine design will include the deeper sections of the orebody, classified as Measured and Indicated Resources, which would extend the LoM and thereby improve the Project economics further. The proposed costs for the DFS are presented in the table below:-

Estimated Proposed DFS Costs
 
DFS PROJECT COMPONENT
ESTIMATED COSTS (USD)
EPCM
1,210,239
Mine Residue storage facilities and water storage dams
31,595
Environmental Studies
115,006
Metallurgical testwork
119,518
Geotechnical studies
269,549
Land survey
63,189
IPP
324,977
DFS implementation and management
541,629
Contingency
273,636
Additional
60,662
TOTAL
3,010,000
 
Graphic
 
 

 

June 2013
ix
 
National Instrument 43-101 Independent Technical
Report for Asanko Gold Incorporated's
Pre-Feasibility Study on the Esaase Gold Project
in Ghana
 
List of Contents
 
1.
Introduction
 
15
 
1.1.
Corporate Structure
 
16
 
1.2.
Sources of Data
 
16
 
1.3.
Scope of the Opinion and Statement of Independence
16
 
1.4.
Contributing Qualified Persons and Personal Inspection
18
 
1.5.
Esaase Project PFS Concept
18
 
1.6.
Terminology
 
20
2.
Reliance on Other Experts
 
20
3.
Property Description and Location
20
 
3.1.
Location, History and Country Profile of Ghana
20
 
3.2.
Physiography of Ghana
21
 
3.3.
Legal Aspects and Tenure
23
   
3.3.1.
Ghanaian Mining Law
23
   
3.3.2.
Esaase Project Mineral Tenure
24
     
3.3.2.1.
Environmental Liabilities
26
     
3.3.2.2.
Permitting
27
     
3.3.2.3.
Other Significant Risks
27
4.
Access, Climate, Local Resources, Infrastructure and Physiography
27
 
4.1.
Topography, Elevation and Vegetation
27
 
4.2.
Accessibility and Proximity to Population Centres
27
 
4.3.
Climate, Vegetation and Operating Season
28
 
4.4.
Local Resources, Infrastructure and Available Surface Rights
28
5.
Historic Ownership and Exploration
28
 
5.1.
Ownership and Historic Exploration
28
 
5.2.
Historic Mineral Resource and Mineral Reserve Estimates
29
 
5.3.
Historic Production
 
29
6.
Geological Setting and Mineralisation
30
 
6.1.
Regional Geological Setting
30
 
6.2.
Local Project Geology
 
32
   
6.2.1.
Structural Aspects
33
   
6.2.2.
Mineralisation
36
7.
Deposit Type
   
36
8.
Exploration
   
38
 
8.1.
Geophysical Programmes
38
 
8.2.
Soil Sampling Programme and Sampling Methodology
38
 
8.3.
Sampling Methodology for the Drilling Programme
40
 
8.4.
Bulk Density Determinations
40
9.
Drilling
     
40
 
9.1.
Diamond Core Drilling Procedures
40
 
9.2.
RC Drilling Procedures
 
41
 
9.3.
Topographic Control
 
41
 
9.4.
Downhole Surveying Procedures
41
 
Graphic
 
 

 

June 2013
   
x
 
 
 
9.5.
Sampling Procedures
 
41
   
9.5.1.
RC Sampling and Logging
41
   
9.5.2.
Diamond Core Sampling and Logging
41
   
9.5.3.
Recovery
 
43
   
9.5.4.
Sample Quality
43
10. Sample Preparation, Analysis and Security
43
 
10.1.
Sample Security
 
43
 
10.2.
Field Quality Control Measures
44
 
10.3.
Laboratory Sample Preparation Methodology
44
 
10.4.
Laboratory Quality Control and Quality Assurance Measures
44
 
10.5.
Quality Control Analysis
45
   
10.5.1.
Umpire Laboratory Assay Results
46
   
10.5.2.
Quality Control and Assurance Conclusions
46
11.
Data Verification
   
48
12. Mineral Processing and Metallurgical Testwork
48
 
12.1.
Previous Metallurgical Testwork and Processing Studies
48
 
12.2.
Metallurgical Testwork Programme Phase V
51
   
12.2.1.
2013 Testwork Scope for Phase V
52
   
12.2.2.
Comminution Testwork Results Phase V
52
   
12.2.3.
Gravity Recovery Results Phase V
52
   
12.2.4.
Batch Flotation Results - 2013
52
   
12.2.5.
Bulk Flotation Results - 2013
53
   
12.2.6.
Flotation Concentrate Leach Test Results
53
   
12.2.7.
Whole-ore Leach Test Results
55
     
12.2.7.1.
Oxide Material Whole-ore Leach
55
     
12.2.7.2.
Transition Material Whole-ore Leach
55
     
12.2.7.3.
Fresh Material Whole-ore Leach
55
 
12.3.
Process Plant Recovery Estimate
58
 
12.4.
Conclusions for Mineral Processing and Metallurgical Testwork
59
13.
Mineral Resource Statement
 
59
 
13.1.
Assumptions. Parameters and Estimation Methodology
59
 
13.2.
Geological and Mineralisation Domains
59
 
13.3.
Treatment of the Alteration Zones
60
 
13.4.
Statistical Analysis of the Raw Data
60
 
13.5.
Variography
 
61
 
13.6.
Estimation Methodology
61
 
13.7.
Classification Criteria
 
63
 
13.8.
Mineral Resource Estimate
64
 
13.9.
Previous Mineral Resource Reconciliation
64
14.
Mineral Reserve Estimate
 
68
15.
Mining Methods
   
69
 
15.1.
Mining Methodology
 
69
   
15.1.1.
Geotechnical Review
69
 
15.2.
Pit Optimisation
 
69
   
15.2.1.
Pit Optimisation Input Assumptions and Parameters
70
   
15.2.2.
Pit Optimisation Results
70
   
15.2.3.
Pit Selection and Mine design
71
   
15.2.4.
Waste Dump Design and Site Plan
73
 
15.3.
Mine Production Schedule
74
 
15.4.
Mining Fleet and Labour Requirements
74
   
15.4.1.
Labour Requirements
74
 
15.5.
Drill and Blast Parameters
74
 
15.6.
Haulage Roads and Pit De-watering
76
 
15.7.
Grade Control
 
76
16.
Recovery Methods
   
76
 
Graphic
 
 

 

June 2013
   
xi
 
 
 
16.1.
Process Description
77
 
16.2.
Process Infrastructure and Reagents
79
17.
Project Infrastructure
79
 
17.1.
Geotechnical Investigation
79
 
17.2.
Esaase Mine Site Layout
81
 
17.3.
Esaase Project Power Supply
86
   
17.3.1.
National Power Grid Supply
86
   
17.3.2.
Independent Power Producer
86
 
17.4.
Esaase Project Water Supply and Management
86
   
17.4.1.
Surface Water Management
88
 
17.5.
Tailings Storage Facility Design
88
 
17.6.
Roads and Buildings
88
18.
Market Studies and Contracts
89
 
18.1.
Market Studies
89
 
18.2.
Material Contracts
89
19.
Environmental Studies
89
 
19.1.
Legislative Requirements
90
   
19.1.1.
Equator Principles
90
   
19.1.2.
IFC Performance Standards
90
   
19.1.3.
Project Categorisation
91
 
19.2.
Stakeholder Consultation
91
 
19.3.
Baseline Environment Studies
92
 
19.4.
Key Environmental Risks Identified and Mitigation
93
 
19.5.
Mine Closure
94
20.
Capital and Operating Costs
95
 
20.1.
Capital Expenditure
95
   
20.1.1.
Mining Capital Expenditure Estimate
96
   
20.1.2.
Process Plant Capital Expenditure
96
   
20.1.3. Mine Residue Disposal Facilities Capital Expenditure
97
 
20.2.
Operational Expenditure
97
   
20.2.1.
Mining Operational Expenditure
97
   
20.2.2.
Process Operating Costs
97
21.
Economic Analysis
 
98
 
21.1.
DCF Model In-put Parameters
98
 
21.2.
DCF Model Results and Sensitivities
99
 
21.3.
Conclusions from the Economic Analysis
99
22.
Adjacent Properties
 
99
23.
Other Relevant Information
101
 
23.1.
Risk Assessment
101
 
23.2.
Project Execution Plan
101
24.
Summary, Interpretations and Conclusions
103
25.
Recommendations
 
107
26.
References
 
110
27.
Glossary and Abbreviations
111
28.
Certificates of Qualified Persons‟
115
 
Graphic
 
 

 

June 2013
 
xii
 
List of Figures
 
 
Figure 1 :
Location and Regional Infrastructure - Esaase Project Ghana
17
Figure 2 :
Physiography of Ghana and the Esaase Project
22
Figure 3 :
Legal Aspects and Tenure - Esaase Project
25
Figure 4 :
Regional Geology of Ghana
31
Figure 5 :
Lithology and Mineralisation of the Esaase Project
34
Figure 6 :
Structural Aspects of the Esaase Project
35
Figure 7 :
Exploration of Esaase Project - Geophysics
39
Figure 8 :
Exploration of Esaase Project - Geological Model
42
Figure 9 :
Mineral Resource Classification and Grade Tonnage Curves
65
Figure 10 :
Grade Distribution
66
Figure 11 :
Esaase Project Mine Design
72
Figure 12 :
Esaase Project Mine Production Schedule
75
Figure 13 :
Recommended Process Flow Sheet
80
Figure 14 :
Original 2013 PFS Mine Site Layout Plan
83
Figure 15 :
Overall Optimised Esaase Project Site Plan for the 2013 PFS
84
Figure 16 :
Esaase Process Plant Layout Plan
85
Figure 17 :
Esaase Project NPV Sensitivity Analysis
100
 
 
 
Graphic
 
 

 
June 2013
xiii
 
List of Tables
 
 
Table 1 : Qualified Persons‟ ITR Responsibility and Site Visits
18
Table 2 : Criteria and Scope 2013 Esaase Project PFS
19
Table 3 : Legal Tenure for the Esaase Project
24
Table 4 : Historic Ownership of the Esaase Project
29
Table 5 : Previous Mineral Resource Estimate - 2011
30
Table 6 : Previous Mineral Reserve Estimate at 0.4g/t Au Cut-off Grade - 2011
30
Table 7 : Sample Preparation Methodologies
44
Table 8 : Laboratory Quality Control Measures
45
Table 9 : Quality Control and Assurance Data Analysis
47
Table 10 : Summary Previous Metallurgical Testwork Phases I to IV
49
Table 11 : Phase 111 Variability Testwork Results for Fresh and Oxide Material
50
Table 12 : Phase 1V Metallurgical Testwork Summary Results
51
Table 13 : Gravity Concentration Results on Composite Samples
53
Table 14 : Batch Flotation Results on Gravity Tailings
54
Table 15 : Bulk Flotation Results on Gravity Tailings
54
Table 16 : Fresh Material Concentrate Leach Test Summary
54
Table 17 : Oxide Material Whole-ore CIL Leach Test Summary Results
56
Table 18 : Transition Material Whole-ore CIL Leach Test Summary Results
56
Table 19 : Fresh Material Whole-ore CIL Leach Test Summary Results
57
Table 20 : Estimated LoM Plant Recoveries for Flotation Included and Flotation Excluded Process Flows
58
Table 21 : Classical Statistical Analysis per Reef
60
Table 22 : Variogram Top-cut and Kriging capping per Reef
61
Table 23 : Variogram Parameters per Reef
61
Table 24 : Global Mean Gold Grade per Reef
62
Table 25 : Confidence Levels for Key Input Data
63
Table 26 : Mineral Resource Classification Criteria
63
Table 27 : NI 43-101 Mineral Resource Estimate at Various Cut-off Grades - Sept 2012
67
Table 28 : Mineral Resource Estimate Reconciliation
67
Table 29 : Modifying Factors
68
Table 30 : NI 43-101 Compliant Mineral Reserve Estimate for the Esaase Project June 2013
68
Table 31 : Pit Optimisation Input Parameters and Assumptions
71
Table 32 : Pit Optimisation Results
71
Table 33 : Esaase Project Mining Labour Requirements
74
Table 34 : Process Trade-off Capital and Operating Costs
77
Table 35 : Process Design Selection and Criteria
77
Table 36 : Recommended Process Flow for Esaase Project
78
Table 37 : Process Plant Reagents
79
Table 38 : Site Layout Option Comparison
81
Table 39 : Specialist Studies undertaken for the Infrastructure Design
82
Table 40 : Hydrological and Hydrogeological Study Results
93
Table 41 : Mine Closure and Rehabilitation Estimated Costs
95
Table 42 : Initial Esaase Project Capital Expenditure Estimates as at March 2013
96
Table 43 : Process Plant Capex
96
Table 44 : Operating Cost Estimates Esaase Project as at June 2013
97
Table 45 : LoM Mining Operational Expenditure
97
 
 
Graphic
 
 

 

June 2013
xiv
 
 
Table 46 : Process Plant Operating Costs
98
Table 47 : DCF Economic In-put Parameters (Source : Venmyn Deloitte 2013)
98
Table 48 : Economic Analysis of the Esaase Project at Various Discount Rates and Gold Prices
99
Table 49 : Critical Gold Price at which NPV=0
99
Table 50 : Risk Evaluation Criteria
102
Table 51 : Proposed Expenditure for the Esaase Project DFS
108
 
 
 
 
 
 
 

Graphic
 
 

 
 
June 2011
15

1. Introduction
 
NI 43-101 Item 2(a), 2(b)
Venmyn Deloitte (Proprietary) Limited (Venmyn Deloitte) was requested by DRA Minerals Projects (DRA), on behalf of Asanko Gold Incorporated (Asanko Gold), to prepare an Independent Technical Report (ITR) on the results of an Update Preliminary Feasibility Study (PFS) on the Esaase Gold Project (Esaase Project or the Project) in Ghana, West Africa.

Asanko Gold is a Toronto Stock Exchange (TSX) and New York Stock Exchange (NYSE) listed junior gold development company with two gold assets in Ghana, namely the Esaase and Asumura Projects, held by Keegan Resources Ghana Inc (Keegan Resources). Asanko Gold trades on the TSX and the New York Stock Exchange (NYSE) under the ticker symbol AKG. This ITR summarises the technical and economic aspects of its wholly owned, flagship Esaase Project only.

The Esaase Project is an advanced gold exploration project at the point of conversion to a development project with 4.4 million (m) ounces (oz) of gold (Au) in the Measured and Indicated Mineral Resource categories with an average grade of 1.45 g/t Au. The Esaase Project has been the subject of several historic technical studies and two prior economic studies, the results of which are available in the public domain. A Preliminary Economic Analysis (PEA) was completed in May 2010 and a PFS by Lycopodium Minerals Proprietary Limited (Lycopodium) was published in September 2011 in the form of a Canadian National Instrument 43-101 ITR by Coffey Mining Limited (Coffey Mining). The 2011 PFS provided Mineral Resource estimations reported in compliance with NI 43-101 and "Joint Ore Reserves Committee" (JORC) ("Australasian Code for Reporting of Exploration Results, Mineral Resource and Ore Reserves") codes. In addition, the 2011 PFS investigated capital and operational costs for an open pit mine, concentrator and whole-rock leach processing plant.

Asanko Gold made the strategic decision in June 2012 to defer the completion of a Definitive Feasibility Study (DFS) based on the 2011 PFS scope and to instead undertake a re-scoped PFS. In August 2012, Asanko Gold completed a Concept Study with the revised project scope and in September 2012 appointed DRA to undertake the new PFS (2013 PFS). The 2013 PFS would permit the incorporation of the updated 2012 Mineral Resource and Mineral Reserve estimate which included increased resources in the Indicated category and new Measured Mineral Resources. The 2012 Mineral Resource estimate would support a new mine design and the 2013 PFS would specifically focus on the feasibility and optimisation of a new process flow design. Re-estimation of the capital, and operational costs, at current gold market conditions would be undertaken.

The purpose of this ITR will be to summarise and document the results of the new PFS (2013 PFS) in terms of technical parameters, Mineral Resources and Mineral Reserves, updated mine design, improved and revised process design, environmental review and economic analysis of the Esaase Project in a manner fully compliant with the requirements of:-

  • the Canadian National Instrument 43-101 Standards for Disclosure for Mineral Projects (Form 43-101F1) and the Companion Policy Document 43-101CP (NI 43-101);
  •  the disclosure and reporting requirements of the TSX as stipulated in the 2007 TSX Company Manual;
  • the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Definition Standards (2005); and
  • CIMVAL Standards and Guidelines for Valuation of Mineral Properties (2003).
Each section of the ITR is designated with the relevant NI 43-101 Item number (NI Item) and the guidelines are considered by Venmyn Deloitte to be a concise recognition of best practice due diligence methods and accord with the principles of open and transparent disclosure that are embodied in internationally accepted Codes for Corporate Governance. These standards of disclosure are the minimum standard for Venmyn Deloitte techno- economic due diligence and embody current trends in technical and economic evaluation of mineral properties. Venmyn Deloitte employs a proprietary checklist that ensures that an internationally acceptable process is completed for the reporting of the mineral assets.
 
Graphic
 
 

 
 
June 2011
16

1.1.           Corporate Structure
Asanko Gold was originally named Keegan Resources Incorporated and changed its name to Asanko Gold in February 2013, to reflect its transformation from an advanced exploration company to a development and ultimately a gold producing company.

Asanko Gold holds several wholly owned subsidiaries as illustrated in Figure 1. The Esaase Project is held by Barbados registered Keegan Ghana Incorporated which in turn holds a 90% shareholding Keegan Resources Ghana Limited. The Ghanaian state holds the remaining 10% of Keegan Resources Ghana Limited. Throughout the ITR the term Keegan Resources refers to Keegan Resources Ghana Limited.

1.2.           Sources of Data
NI 43-101 Item 2 (c)
The original 2009 Mineral Resource estimate undertaken by Coffey Mining was based on the following key digital data provided by Asanko Gold:-
  • drillhole database containing collar location, downhole survey, assay and geological data;
  • 3-dimensional model of the topography (digital terrain model);
  • a representative selection of the original assay sheets;
  • quality control procedures and database;
  • internal and external quality control data;
  • bulk density dataset derived from drillcore; and
  • representative geological cross-sections.
The information included in the 2013 PFS was sourced from the following project specific studies, information in the public domain, individual specialist studies that comprise the various sections of the ITR and additional sources which are all listed in the Reference List (Section 26) :-

  • Esaase Gold Project Pre-Feasibility Study dated September 2011;
  • 2011 Coffey, Esaase Gold Project, Ghana NI 43-101 Technical report dated 22September, 2011;
  • 2009 Coffey, Esaase Gold Deposit Resource Estimation, dated 24 April, 2009;
  • The 2012 Mineral Resource estimate by Minxcon (Proprietary) Limited (Minxcon); and
  • Revised Eburnean geodynamic evolution of the gold-rich southern Ashanti Belt, Ghana, with new field and geophysical evidence of pre-Tarkwaian deformations.
1.3. Scope of the Opinion and Statement of Independence
NI 43-101 Item 2(c)
Venmyn Deloittes primary obligation in preparing mineral asset reports for the public domain is to describe mineral projects in compliance with the reporting codes applicable under the jurisdiction in which the company operates. In this case, it is the Canadian NI 43-101 code, as discussed in Section 1.

In the execution of its mandate, Venmyn Deloitte and the contributing consultants undertook the 2013 PFS, in order to identify the factors of both a technical and economic nature, which would impact the future viability of the Esaase Project. Venmyn Deloitte prepared this ITR for potential investors and their advisors. Venmyn Projects considered the strategic merits of the asset utilising the best practise due diligence methodologies. The ITR has been compiled in order to incorporate all available and material information that will enable potential future finance providers to make balanced and reasoned judgements regarding the economic merits of the Esaase Project.
 
Graphic
 
 

 
Graphic

 
 
 

 
 
June 2011
18

Venmyn Deloitte is an independent advisory company. Its consultants have extensive experience in preparing Technical Reports, technical advisers and valuation reports for mining and exploration companies. Venmyn Deloitte advisors have, collectively, more than 100 years of experience in the assessment and evaluation of mining projects and are members in good standing of appropriate professional institutions. The signatories to this report are qualified to express their professional opinions on the Project and qualify as Qualified Persons, as defined by the Canadian National Instrument 43-101 Standards of Disclosure for Mineral Projects. To this end, Qualified Persons Certificates are presented in Appendix 2.

Neither Venmyn Deloitte nor its staff, have or have had, any interest in any of Asanko Gold projects capable of affecting their ability to give an unbiased opinion, and, have not and will not, receive any pecuniary or other benefits in connection with this assignment, other than normal consulting fees. Neither Venmyn Deloitte, nor any of the authors of the ITR, hold any interest in Asanko.

1.4. Contributing Qualified Persons and Personal Inspection
NI 43-101 Item 2 (d)
The 2013 PFS was undertaken by independent specialist consultants under the management of DRA and a summary of the contributing consultancies is presented in Table 1. Most consultancies provided teams of technical advisors who contributed to the various studies and each consultancy has nominated an overall Qualified Person in terms of the definition in NI 43-101 Standards of Disclosure Part 1.1, who has signed-off the appropriate sections of the ITR. The Qualified Person from each team, has had a technical team member as a representative visit the Esaase Project or has personally visited the site, as summarised in Table 1:-

Table 1 : Qualified Persons' ITR Responsibility and Site Visits
CONSULTANT
2013 PFS COMPONENT
QUALIFIED
PERSON
SITE VISIT ITR SECTION NI 43-101 Item
 DRA Mineral Projects
(Pty) Limited (DRA)
Study Management, Power
Supply, Infrastructure and Capital and
Operating Costs
Mr D. Heher
01 July 2012
Section 17.1,
17.2, 17.3, 17.4,
17.6, 20, 23
 
Item 18, 21,
 DRA  Process Plant and Metallurgy
Mr G.
Bezuidenhout
Several visits in 2012-2013
to Amdel Laboratories in
Australia to supervise
metallurgical testwork
Section 12,
12.1 to 12.4, 16
to 16.2
 
Item 13, 17
DRA Mineral Projects
(Pty) Limited - Mining
Division (DRAM)
Reserve Estimation and Mine
Design
Mr T. Yeboah
DRA mining team site visit
1 September 2013
Section 14, 15   Item 15, 16, 18
Minxcon Proprietary
Limited
Mineral Resource Estimate Mr C. Muller
29 September to 2
October 2012
Section 3, 4, 5,
6, 7, 8, 9, 10,
11,13
Item 4, 5 ,6, 7,
8, 9, 10, 11, 12,
14
Epoch Resources
(Proprietary) Limited
Mine Re-habilitation and Closure
Mine Residue Disposal Facilities
Mr G Wiid
Epoch team site visit
16 to 18 April 2013
Section 17.5,
19.5, 20.1.3
Item 18, 20
Epoch
Social and Environmental Impact
Assessment
Mr F. Coetzee 26 to 30 November 2012
Section 19. to
19.4
Item 20
Venmyn Deloitte
Proprietary Limited
(Venmyn Deloitte)
43-101 including Financial Model
Development and Related
Analysis
 Mr A Clay,  No site visit
Section 1, 2, 18,
21, 22, 24, 25,
26, 27
Item 1, 2, 19,
22, 24, 25, 26,
27
 
1.5. Esaase Project PFS Concept
NI 43-101 Item 2 (b)
In September 2011 Asanko Gold commissioned Coffey Mining and Lycopodium to undertake a PFS for the Esaase Project based on the criteria listed in Table 2. The 2011 PFS was based on an open pit mining methodology with a "whole-ore" leach processing plant. The study included an unlined Tailings Storage Facility (TSF) with initial mill throughputs of 9 million tonnes per annum (Mtpa), reducing to 7.5Mtpa once mining of the fresh zone began. The PFS resulted in a positive Net Present Value (NPV) for the Project but additional studies indicated that better economic outcomes could be achieved with alternative process design methodologies.
 
Graphic
 
 

 
 
June 2011
19

Table 2 : Criteria and Scope 2013 Esaase Project PFS
PFS CRITERIA
APRIL 2013
Mineral Resource Base (inclusive of Mineral
Reserves)
Measured + Indicated Mineral Resources of 94.62Mt at 1.45g/t Au
for 4.41Moz contained gold
Mineral Reserve Base
Proven and Probable Mineral Reserves of 52.43Mt at 1.41g/t Au
for 2.37Moz contained gold
Mine Design Optimisation-Pit size
277Mt
Mine Design Optimisation-Waste
224Mt
Mine Design Optimisation-Ore
52Mt
Stripping Ratio
4.28
Average Grade
1.41g/t
In situ Au
2.4Moz
Process Design
Flotation/Carbon-in-leach (CIL)
Mill Throughput (Oxide Zone)
5Mtpa
Mill Throughput (Fresh Zone)
5Mtpa
Tailings Storage Facility
Clay lined float TSF and separate lined CIL TSF
Initial Water Storage
1.43Mm3
Gold Price
USD1,400
Source: DRA 2013 and Coffey Mining 2011
 
Asanko Gold made the strategic decision in June 2012 to defer the initiation of a Definitive Feasibility Study (DFS) based on the 2011 PFS concept scope and criteria, and to instead undertake a re-scoped update PFS. In August 2012, Asanko Gold completed a Concept Study with the revised project scope and in September 2012 appointed DRA to undertake the new 2013 PFS.

The 2013 PFS would permit the following changes (Table 2):-

  • publication of an updated 2012 Mineral Resource and Mineral Reserve estimate which includes increased resources in the Indicated category and new Measured Mineral Resources;
  • the 2012 Mineral Resource estimate would support a new optimised mine design based on the new resource estimate;
  • the feasibility and economics of a flotation with carbon-in-leach (CIL) plant could be investigated;
  • the PFS was to target a life-of-mine (LoM) of at least 10years with an average gold production of 200,000oz per annum (ozpa);
  • the 2013 PFS would specifically focus on the capital and operational costs at 2013 gold prices.
The potential for optimisation of various criteria became obvious as the 2013 PFS progressed and a 2013 PFS base case was identified as a result of these optimisation studies with the following specific criteria changed from, or added to, the initial 2012 PFS scope:-

  • 5Mtpa run-of-mine (RoM) material processed through the process plant;
  • addition of a flotation plant which would entail primary and secondary crushers feeding to a RoM ball mill. The flotation concentrate would be reground before leaching;
  • only the Southern Pit and Main Pit would be developed;
  • initially the waste rock was planned to be trucked to a waste rock dump located approximately 3km to the west of the main pit as opposed to the south (Table 2) but further optimisation indicated that the best economic results were obtained from dumping the waste rock within the 500m blast exclusion zone as far as possible to reduce haulage costs;
  • the tailings would be processed into two independent streams feeding differing TSFs:-
  • a CIL tailings stream to be deposited in a lined leach TSF (L-TSF) which would accommodate 10% of the RoM; and
  • flotation tailings stream to be sent to a clay lined TSF (F-TSF) accommodating approximately 90% of the RoM. The site of the F-TSF to be relocated to maximise efficiency;
Graphic
 
 

 
 
June 2011
20
  • the Project start up water would initially be stored in the empty L-TSF to reduce infrastructure expenditure;
  • a buffer dam was relocated from the original plans; and
  • the power supply was changed from supply from the national utility company (Gridco) to Independent Power Producer (IPP).
1.6. Terminology
The Canadian National Instrument Companion Policy 43-101 (Section 2.3) states "We consider the use of the word "ore" in the context of mineral resource estimates to be misleading because "ore" implies technical feasibility and economic viability that should only be attributed to mineral reserves". In compliance with Section 2.3 of the Companion Policy, the term "ore" is not used in the Mineral Resource context of this ITR (Section 13). The term "whole-ore" leach is used in the processing sections of the ITR and implies no demonstration of economic viability.
 
2. Reliance on Other Experts
NI 43-101 Item 3 (a)
Venmyn Deloitte is not qualified to provide extensive comment on legal issues, including the status of tenure associated with the Project. In the assessment of these aspects it has relied upon information provided by Keegan Resources, which has not been independently verified by Venmyn Deloitte. The 2013 PFS has been prepared on the understanding that the property is, or will remain, lawfully accessible for evaluation, development, mining and processing.

Minxcon has relied on information supplied by Keegan Resources to be valid and complete, which applies to and is not limited to the:-

Esaase Gold Project Pre-Feasibility Study dated September 2011;
2011 Coffey, Esaase Gold Project, Ghana NI 43-101 Technical report dated 22 September 2011; and
2009 Coffey, Esaase Gold Deposit Resource Estimation, dated 24 April, 2009.
 
Minxcon has scrutinised all the information provided by these companies and is satisfied that the information is sound and could be used in the preparation of an NI 43-101 compliant Mineral Resource estimate.

Venmyn Deloitte fully relied on the geophysical expertise of Geotech Limited for the geophysical survey and interpretation of results by Condor Consulting Incorporated (Condor) reported in Coffey Mining 2011 and summarised in the exploration results Section 8 of this ITR.
 
3. Property Description and Location
NI 43-101 Item 4(a), (b)
The Esaase Project is located in southwest Ghana in West Africa as illustrated in Figure 1, within the Amansie West District of the Ashanti Region, approximately 35km southwest of the regional capital Kumasi (Figure 1). The Project comprises two contiguous mining leases and four prospecting licences that cumulatively cover an area of approximately 99.10km2 (Figure 2). The Esaase mining lease area is referred to throughout the ITR as the Esaase concession and the Jeni mining lease area as the Jeni concession. The Esaase and Jen concessions contain alluvial gold deposits in the Bonte River valley which have been exploited historically by artisanal miners. The Esaase Project however, is focussed on the primary host Birimian aged meta-sediments and not on evaluation of the alluvial deposits.

3.1. Location, History and Country Profile of Ghana
The Republic of Ghana is a West African country approximately 239,000km2 in size and is one of the five African nations along the northern coastline of the Gulf of Guinea.
 
Graphic
 
 

 
 
June 2011
21
 
During the first half of the twentieth century Ghana was called the Gold Coast which at that time was a British colony. Ghana was the first sub-Saharan country in colonial Africa to be granted independence, which took place on 6 March 1957. Following a national referendum in July 1960 Ghana became a republic. Between 1966 and 1992 periods of democratic rule alternated with military rule. By 1992 the economy had stabilised, a new constitution was inaugurated and Ghana returned to democracy with the election of Jerry Rawlings as president. Rawlings National Democratic Congress party continued in power throughout the 1990s, being replaced by the New Patriotic Party in the 2000 democratic election. Ghana has been under continuous democratic rule for the last seventeen years and the last general election was held in December 2012 and was won by the National Democratic Congress.

Ghana has a developing mixed economy based largely on agriculture and mining and is one of the most developed countries in tropical Africa. The gross national product (GNP) is keeping pace with population growth and the domestic economy of Ghana is dominated by subsistence agriculture, which accounts for approximately 25% of the gross domestic product (GDP). Ghana has substantial natural resources and a much higher per capita output than many other countries in West Africa. Nevertheless, it remains dependent on international financial and technical assistance. The most important source of foreign exchange is gold mining, followed by cocoa and timber products. Ghana is the worlds tenth and Africas second largest producer of gold, with gold production of 2.97Moz in 2010.

Inflation, decreasing currency exchange rate and high interest rates have caused concern in recent years, but are improving with more stringent fiscal and monetary policies. The transport infrastructure within Ghana is comparatively good for the region. Since the early 1990s multiple large, medium and small gold mining operations have been developed in Ghana with both their construction and ongoing operational logistic requirements being met by the two main ports and the internal road network. Ghana has no natural harbours and two artificial harbours were built at Takoradi and Tema to accommodate Ghana's shipping requirements.

A distinguishing geographic feature of Ghana is the Volta River, which was dammed in 1964 (Akosombo Dam) to create the enormous Lake Volta which occupies a sizeable portion of Ghanas south-eastern territory.

3.2. Physiography of Ghana
Ghana is characterised by low physical relief as the Precambrian basement sequences have undergone considerable erosion (Figure 2). The highest elevation in Ghana, Mount Afadjato in the Akwapim-Togo Ranges, rises only 880m above sea level (mamsl).

The country is divided into four distinct geographical regions:-

  •  the Low Plains which cover the southern part of the country and comprise the coastal savannah, the Volta Delta, the Accra Plains and the Akan lowlands.
  • The Volta Delta, extends into the Gulf of Guinea and is a flat featureless region which consists of thick sandstone, limestone, and silt deposits. The coastline consists of a low sandy coastal plain, except in the west, where the forest extends to the ocean;
  • the Ashanti Uplands and the Kwahu Plateau, which are located north of the Akan lowlands and continue into Cote dIvoire. The forest belt, which extends 320km northward from the western coast and eastward for a maximum of 270km, is broken up into heavily wooded hills and steep ridges. The Uplands form a physical divide for the major river systems (Figure 2) i.e. the Afram and Pru rivers flow into the Volta river, whilst from the opposite side, the Pra, Birim, Ofin, Tano, and other rivers flow south toward the sea (Figure 2). Apart from the Volta river, only the Pra and the Ankobra rivers permanently cross the coastal dunes as most of the other rivers terminate in brackish lagoons. The Ashanti Uplands forms the northern limit of the forest zone (Figure 2);
  • the Volta Basin occupies the central regions of Ghana and covers 45% of the land surface (Figure 2). The northern section of the basin lies above the upper part of Lake Volta, and rises to a height of 150m to 215mamsl whilst to the south and the southwest the elevation is less than 300m. Lake Volta, formed by the impoundment of the Volta behind Akosombo Dam, is the world's largest manmade lake with a surface area of 8,485km2; and
Graphic
 
 

 
Graphic
 
 

 
 
June 2011
23
  • the High plains which occupy the northern and northwestern region of Ghana and comprise a dissected plateau, which averages between 150m and 300mamsl in elevation. Soils in the high plains are more arable than those in the Volta Basin, and the population density is considerably higher.
The climate throughout most of Ghana is either a wet or dry tropical climate type, marked by warm to hot temperatures throughout the year, and abundant rainfall in only one season. This characteristic is especially noticeable in northern Ghana where less annual rainfall and strictly seasonal precipitation is prevalent. Although this region receives 750mm to 1,000mm of rain annually, severe dry spells occur from November to March. Most of Ghana receives 1,000mm to 1,500mm annual precipitation typical of savannah type climates.

A second climatic region exists in southwestern Ghana which is a wet tropical climate with hot temperatures throughout the year and abundant rainfall (over 2,000mm), well distributed throughout the year.

Ghana experience warm to hot temperatures throughout the year because of its proximity to the Equator and its relatively low elevation. The average annual temperature in Accra, Ghana, is 27ºC. The northern section of Ghana has hotter temperatures and some seasonal temperature variations because it is farthest from the moderating influence of the ocean, and closest to the Sahara desert.

3.3. Legal Aspects and Tenure
NI 43-101 Item 4(c)
 
3.3.1. Ghanaian Mining Law
NI 43-101 Item 4 (e)
The Ghanaian mining industry is regulated by the Ministry of Mines and Energy within the overall legislative framework of the Minerals and Mining Law of 1986 (Law 153) which was as amended in 1994 and 2005. The Minerals and Mining Law stipulates the payment of royalties and standard corporate tax rates by mining companies. The royalty payable by the mining sector to the Ghanaian government was increased from 3% to 5% in 2010.

The Minerals and Mining Act of 2006 (Act 703) embodies the conditions pertaining to the application and retention of mineral rights in Ghana. In terms of the Act, all minerals are the property of the state and are vested in the President in trust for the nation. The approval of mineral right applications is subject to recommendations by the Minerals Commission and rests with the Minister on behalf of the President.

The Ministry of Mines and Energy oversees all aspects of Ghanas mineral sector and within the Ministry:-

  • the Minerals Commission has responsibility for administering the Mining Act, recommending mineral policy, promoting mineral development, advising the Government on mineral matters, and serving as a liaison between industry and the Government;
  • the Ghana National Petroleum Corporation (GNPC) is the Government entity responsible for petroleum exploration and production;
  • the Precious Minerals Marketing Corporation (PMMC) is the Government entity responsible for promoting the development of small-scale gold and diamond mining in Ghana and for purchasing the output of such mining, either directly or through licensed buyers; and
  • the Mines Department has authority in mine safety matters. All mine accidents and other safety problems also must be reported to the Ghana Chamber of Mines, which is the private association of operating mining companies.
The Minerals and Mining Act 2006 provides for the following mineral rights which are only granted to persons incorporated under the Ghanaian Companies Code 1963 (Act 179):-
 
Graphic
 
 

 
 
June 2011
24

  • reconnaissance licence: granted initially for one year which permits exploration but no drilling or excavation. The reconnaissance licence can be extended once for a period of one year and can apply to an area not more than 5,000 contiguous blocks of 21ha each;
  • prospecting licence: granted for three years which permits exploration activities according to an approved programme. The licence can be extended for a further three years with a compulsory simultaneous reduction in area of 50%. A prospecting licence cannot exceed an area comprising 750 contiguous blocks of 21ha each;
  • mining lease: granted for thirty years or a lesser period dependent on the expected Life of Mine (LoM) of the project. A mining lease can be extended for an additional thirty years. The lease is applicable to specific minerals and permits exploitation of the mineral, erection of necessary infrastructure and storage of waste material according to the specification of an approved Environmental Impact Assessment (EIA). Mining leases require adherence to the Water Resources Commission Act (Act 552), forestry and environmental protection regulations and regular reporting of activities to the Minerals Commission. All geological information must be submitted to the Geological Survey and copyright of such information resides with the state.
The holder of a mineral right can only exercise the rights under this Act subject to the limitations relating to surface rights. Surface rights owners are permitted to continue agricultural activities if these do not hamper exploration and exploitation. Surface rights owners may apply to the Minister for compensation or re-settlement arrangements.

The holder of mineral rights in Ghana is required to pay annual mineral right fees, annual land rental fees and royalties at a maximum rate of 6% of the total revenue from minerals obtained by the holder.

3.3.2. Esaase Project Mineral Tenure
NI 43-101 Item 4(a), 4(b), 4(C), 4(d), 4(e)
The Esaase Project comprises two contiguous mining leases and four prospecting licences that cumulatively cover an area of approximately 99.10km2. The two mining leases, namely Esaase and Jeni River mining leases, are elongate contiguous concessions, a total of approximately 20km in length, trending in a northeasterly direction, as illustrated in Figure 3.

The mining leases are bordered in the north and south by smaller prospecting licences (the Mpatoam, Mepom, Dawohodo and Sky Gold prospecting licences), which constitute approximately 25% of the Project area (Table 3, Figure 3). The Asanko Gold legal tenure is summarised in Table 3:-

Table 3 : Legal Tenure for the Esaase Project
MINERAL RIGHT
REFERENCE
NUMBER
AREA
(km2)
CO-ORDINATES EXPIRY DATE HOLDER
Esaase Mining Lease
EPA/PR/PN/804
27.03
1° 53‟ west, 6° 34‟ north
03 September 2020
 
 
 
Keegan Resources
Ghana Limited
 
 

Jeni River Mining Lease
EPA/PR/PN/805
43.41
1° 98‟ west, 6° 52‟ north
21 March 2020
Mpatoam PL*
EPA/PR/PN/806
9.83
1° 57‟ west, 6° 33‟ north
30 November 2011
Mepom PL **
LVB19490/09
2.37
1° 56‟ west, 6° 33‟ north
17 February 2011
Dawohodo PL*
EPA/PR/PN/733
10.36
1° 54‟ west, 6° 32‟ north
08 March 2011
Sky Gold C PL***
RL3/22
4.60
2°00‟ west, 6° 30‟ north
20 June 2012
Sky Gold D PL***
RL3/22
1.50
1° 53‟ west, 6° 32‟ north
20 June 2012
         
TOTAL   99.10      
Source : Asanko Gold 2013
The state of Ghana holds 10% free carried interest in Keegan Resources
EPA - Environmental protection Agency Reference Number (see Sections 3.3.2.2 and 19)
LVB - Land Valuation Board Reference Number
RL - Reconnaissance Licence Reference Number
*Renewal of PL application submitted and fees paid
**Terminal reports submitted to the Mining Commission. Renewal of licence pending
***Awaiting approval of application for conversion to prospecting licences
 
Graphic
 
 

 

Graphic
 
 

 
 
June 2011
26
 
The Jeni River mining lease was originally granted in March 1990 to the Jeni River Development Company Limited and the Esaase mining lease was granted to Bonte Gold Mines Limited in September 1990. Both of these companies filed for bankruptcy in 2002.

The Esaase mining lease was acquired from the Bonte Liquidation Committee by Sametro Company Limited, a private Ghanaian company. Asanko Gold entered into an agreement with Sametro in May 2006 to earn 100% of the mineral right and transfer of the Esaase mining lease to Asanko Gold was completed in June 2007.

Asanko Gold acquired the Jeni River mining lease in March of 2008 from the Bonte Liquidation Committee and the Minerals Commission of Ghana. The leases are valid until 2020 and can be renewed for an additional thirty year period. The mining leases permit Asanko Gold to undertake mining activities provided certain conditions and fee payments are maintained with the Ministry of Lands, Forestry and Mines.

The prospecting licences were acquired by Asanko Gold as follows:-

  •  the Mepom prospecting licence was purchased from a private Ghanaian company, Mepom Mining Company, and transferred to Asanko Gold on in June 2009;
  • the Mpatoam prospecting license is a new concession granted to Keegan Resource in November 2009;
  • Sky Gold reconnaissance licence granted July 2011 over 91.5km2;
  • Dawohodo prospecting licence 10.6km2 in January 2011
The Ghanaian government has a standard 10% free carried interest in all permits within the country but this interest only comes into effect once exploitation and production commences. The Minerals and Mining Act 2006 also makes provision for a royalty on mining revenue which was increased in 2010 to a maximum of 6%. The royalties applicable to gold mining are 5%. In addition, the mining leases contain provision for a 0.5% royalty payment to the Bonte Liquidation Committee.

The surface rights in the Project area are held by the head of the Ashanti tribe. As soon as exploitation and revenue production commences, the Manso-Nkwanta Paramountcy Stool has the right to approach the state for compensation by way of a share in the royalties. The amount of the compensation is subject to approval by the Minister of Mines in consultation with the Land Valuation Board.

3.3.2.1. Environmental Liabilities
NI 43-101 Item 4 (f)
The historic alluvial mining activities by Bonte Gold Mines Limited, resulted in extensive land disturbances and silting of the drainage systems which has caused a diversion of the relatively small Bonte and Jeni Rivers. A substantial percentage of the disturbed land was successfully re-vegetated, however the shallow mined areas, particularly on the Jeni River mining lease, were not rehabilitated by Bonte Gold Mines Limited at the time of closure of the operation.

A series of shallow impoundments were constructed on the Esaase concession as settling ponds for clay-rich sediments and these have naturally vegetated since closure to become a series of wetlands.

The Bonte Liquidation Committee acts on behalf of the Ghanaian Government and its agreement with Asanko Gold, stipulates that Asanko Gold assumes no environmental liability arising from the historic operations on the Esaase mining lease. In terms of the Jeni River mining lease, Asanko Gold has agreed to remediate the existing environmental disturbance should any large-scale mining operation be undertaken on the concession.

Graphic
 
 

 
 
June 2011
27

3.3.2.2.Permitting
NI 43-101 Item 4(g)
Asanko Golds defined gold resources and identified exploration targets are fully encompassed by and authorised by the Esaase and Jeni River mining leases.

The primary permits required for the development of the Project include the following:-
 
Environmental Protection Agency (EPA) permit issued by the Minister of Environment;

  • an amendment to the existing mining leases issued by the Minister of Lands, Forestry and Mines on the advice of the Minerals Commission for intended amendments to the programme of mining operations;
  • various other permits from other government departments including water abstraction permit and surface storage facilities; and
  • renewal of the mining leases in 2020.
In terms of the above requirements, Asanko Gold has a valid EPA permit to the end of 2013. In addition, Asanko Gold has the right to mine under the existing mining leases; however, before mining activities can be undertaken, the submission of a mine plan to the EPA will be required and on approval, a mining permit will be issued.

3.3.2.3. Other Significant Risks
NI 43-101 Item 4(h)
To the best of Asanko Golds knowledge, no additional risks exist above those normally associated with an exploration and mining venture and those specifically discussed in the preceding sections.

4. Access, Climate, Local Resources, Infrastructure and Physiography
NI 43-101 Item 5
4.1. Topography, Elevation and Vegetation
NI 43-101 Item 5 (a)
The Esaase Project is located within the Ashanti Uplands of central Ghana (Figure 2) and the main topographic feature of the area is the Bonte River valley which traverses the properties in an approximate east-west direction. The Bonte River is bounded by steep valley sides which reach an elevation of 500mamsl. The river valley has been extensively exploited by artisanal miners seeking alluvial gold and the mining activity is clearly visible on the satellite image as overburden and tailings dumps (Figure 2).

The Esaase Project area primarily supports subsistence farming producing mainly food crops such as plantain, corn, cassava, yam, tomatoes and some cash crop such as cocoa and oil palm. Approximately half of the Project area comprises secondary forest and thick natural vegetation.

4.2. Accessibility and Proximity to Population Centres
NI 43-101 Item 5 (b), (c)
The Esaase Project is located in the southern-central area of Ghana within a region of developed local infrastructure and reasonably dense population.
 
Graphic
 
 

 

 
June 2011
28
 
The Project is located in the Ashanti Province 35km southwest of the regional capital Kumasi. The renowned Obuasi Mine in the Ashanti Belt lies approximately 30km to the southeast of Esaase Project and the Bibiani Mine 40km directly to the west.

The Esaase Project area is accessed from Kumasi via 10km of tarred road, westwards towards Bibiani Junction at the town of Asenemuso. The access route continues southwest for 10km to the village of Wiaso, where a secondary asphalt road accesses the village of Amankyea 8km to the south. The Project area is reached via 11km of gravel roads through the villages of Ahewerwa and Tetrem as shown in Figure 3. The access within the prospecting and mining licences is via a series of secondary roads constructed either by the former Bonte Gold Mines or by Keegan Resources. Regions of the Project area undergoing surface exploration are accessed by both dirt roads and footpaths.

4.3. Climate, Vegetation and Operating Season
NI 43-101 Item 5 (d)
The Esaase Project is located within the deciduous forest region of Ghana as shown in Figure 2 and the annual rainfall in the Ashanti Province ranges between 1,500mm to 2,000mm and temperatures range from 22°C to 36°C. The major wet season occurs from April to July followed by a minor rainy season from September to October. Asanko Gold has operated without cessation or delay throughout both of the rainy seasons.
 
4.4. Local Resources, Infrastructure and Available Surface Rights
NI 43-101 Item 5 (e)
The Esaase Project is located within a 45km radius of the well-developed Sefwi and Ashanti Belts gold mining regions. The mature mining industry in the region ensures local availability of both skilled and unskilled personnel. The area is well serviced by the Ghana national power grid with at least two alternate points of supply within a 50km radius of the potential plant site and open pit mine and surrounding villages are connected to the national power supply. Mobile telephone communication is accessible in most parts of the concession and a satellite dish is installed in the current exploration camp for internet access.

The nearest medical clinic and police station are located at Toase-Nkawie, on the Bibiani Highway, 20km from the exploration camp. Hospitals and most government offices are available in Kumasi. Food and general supplies are available in Kumasi.

The surface rights available for the Esaase Project TSFs, plant site and waste rock disposal dumps are adequate for the Project requirements as demonstrated in Section 17 (Figure 15). A detailed discussion of the availability of power, water and mining personnel is presented in Section 17.
 
5. Historic Ownership and Exploration
NI 43-101 Item 6
5.1. Ownership and Historic Exploration
NI 43-101 Item 6(a), (b)
The Bonte River region alluvial gold deposits have been exploited by artisanal miners for decades. Evidence exists of adits excavated by European settlers, between 1900 and 1939, however, no documented records remain of the mining activity. Drilling was conducted on the Bonte River valley alluvial sediments during 1966 and 1967 to determine alluvial gold potential.

In 1990, the original Bonte mining lease was granted to Akrokerri- Ashanti Gold Mines and was later transferred to a local subsidiary namely Bonte Gold Mining Company (Table 4). Bonte Gold Mining Company reportedly recovered approximately 200,000oz of alluvial gold on the Esaase mining lease area and another 300,000 oz downstream on the Jeni River mining lease area, prior to entering into receivership in 2002.
 
Graphic
 
 

 
 
June 2011
29

The Esaase concession, including the camp facilities at Tetrem, was acquired from the Bonte Liquidation Committee by Sametro Company Limited, a private Ghanaian company and in May, 2006, Keegan Resources signed a letter of agreement with Sametro to earn 100% of the Esaase concession over a three year period of work commitments and option payments. Since mid-2006, Keegan Resources has undertaken an extensive exploration programme combining soil geochemistry and Induced Polarisation (IP) geophysical surveys followed by diamond and reverse circulation (RC) exploration and resource drilling.


Table 4 : Historic Ownership of the Esaase Project
DATE
OWNERSHIP APPROVALS AND TRANSFERS
March 1990
Jeni River mining lease granted to Jeni River Development Company Limited
September 1990
The Esaase lease was granted to Bonte Gold Mining
November 2002
Dawohodo Manufacturing and Marketing Limited, a Ghanaian incorporated private company granted the prospecting
 
licence over the area now covered by the Esaase Project (Dawohodo-Esaase prospecting licence)
 
Jeni River Development Company Limited and Bonte Gold Mining declared bankrupt
2003
Esaase Mining Lease, including the camp facilities at Tetrem, was acquired from the Bonte Liquidation Committee by
 
Sametro Company Limited, a private Ghanaian company
May 2006
Keegan Resources entered into an option agreement with Sametro to earn 100% of the Esaase Mining Licence
June 2007
Transfer of the Esaase Mining Lease to Keegan Resources
June 2007
Sky Gold Limited, a Ghanaian incorporated private company granted reconnaissance licence
 
Keegan Resources acquired the Jeni River mining lease for a consideration of USD50,000 to BLC and USD50,000 to the
March 2008
Minerals Commission of Ghana
March 2008
Transfer of Jeni River mining lease to Keegan Resources
June 2009
Mepom prospecting licence acquired from Mepom Mining Company
November 2009
Mpatoam prospecting licence granted to Keegan Resources
July 2010
An agreement was entered into between Keegan Resources and Sky Gold Limited
July 2011
Ministerial consent to the option agreement between Sky Gold Limited and Keegan Resources
November 2010
An agreement was entered into between Keegan Resources and Dawohodo Manufacturing and Marketing Limited
January 2011
Ministerial approval for the assignment of the Dawohodo-Esaase prospecting licence to Keegan resources
 
Land swop with Mpatoam Small Scale Mining Company to acquire 10.3km2 southwest of the Esaase Main zone and
October 2012
relinquish the western portion of the Jeni concession
Source : Minxcon 2012

5.2. Historic Mineral Resource and Mineral Reserve Estimates
NI 43-101 Item 6 (c)
Venmyn Deloitte is unaware of any estimate of the quantity, grade, or metal or mineral content that was prepared before Asanko Gold acquired an interest in the Project therefore no historic Mineral Resource estimates are available for the Esaase Project.

Previous Mineral Resource estimates, as defined by Section 2.4 NI 43-101 Standards of Disclosure, were compiled for Asanko Gold by Coffey Mining in 2007, 2009 and 2011. The previous Mineral resource estimate by Coffey Mining in 2011 is presented in Table 5 and the categories are consistent with NI43-101 Section 1.2 and 1.3 categories. The Mineral Resource estimate by Minxcon 2012 is considered the current Mineral Resource basis for the 2013 PFS (see Section 13).

5.3. Historic Production
NI 43-101 Item 6 (d)
The alluvial gold deposits on the Esaase and Jeni concession areas were exploited in the early 1990s by the Bonte Mining Company until bankruptcy entering receivership in 2002. The Bonte Gold Mining Company recovered an estimated 200,000oz of alluvial gold on the Esaase concession and another 300,000oz downstream on the Jeni River concession.
 
Graphic
 
 

 
 
June 2011
30

Table 5 : Previous Mineral Resource Estimate - 2011
 
 
RESOURCE CATEGORY
 

CUT-OFF
 
GRADE
 
(g/t Au)
 
TONNAGE
 
(Mt)

 
GRADE
 
(g/t Au)

CONTAINED
 
METAL
 
(Moz)
 
 
 
Measured
 
 

0.4
5.03
1.2
196
0.5
4.66
1.3
191
0.6
4.21
1.4
183
0.7
3.73
1.4
173
0.8
3.26
1.5
162
0.9
2.83
1.7
150
1.0
2.44
1.8
139
 
 
 
Indicated
 
 

0.4
93.71
1.1
3,441
0.5
83.03
1.2
3,288
0.6
72.04
1.3
3,096
0.7
61.67
1.5
2,882
0.8
52.51
1.6
2,663
0.9
44.72
1.7
2,451
1.0
38.14
1.8
2,251
 
 
 
Inferred
 
 

0.4
45.90
1.1
1,553
0.5
40.54
1.1
1,476
0.6
34.82
1.2
1,375
0.7
29.39
1.3
1,265
0.8
24.79
1.4
1,153
0.9
20.61
1.6
1,039
1.0
17.12
1.7
932
Source : Coffey Mining 2011
Compliant with NI 43-101 Standard of Disclosure
Inconsistencies in computation due to rounding

The 2011 Mineral Reserve Estimate (Table 7) was carried out by Coffey Mining in 2011 and is presented in Table 6.

Table 6 : Previous Mineral Reserve Estimate at 0.4g/t Au Cut-off Grade - 2011
RESERVE CATEGORY
PROVEN
PROBABLE
TOTAL
 
Tonnage
 
(Mt)

 
Grade
 
(g/t Au)

Contained
 
Gold
 
(Moz)
 
Tonnage
 
(Mt)

 
Grade
 
(g/t Au)

Contained
 
Gold
 
(Moz)
 
Tonnage
 
(Mt)

 
Grade
 
(g/t Au)

Contained
 
Gold
 
(Moz)
5.1
1.2
0.199
74.3
1.1
2.68
79.4
1.1
2.88
Source : Coffey Mining 2011
Compliant with NI 43-101 Standard of Disclosure
Inconsistencies in computation due to rounding
 
6. Geological Setting and Mineralisation
NI 43-101 Item 7 (a), (b)

6.1. Regional Geological Setting
NI 43-101 Item 7 (a)
West Africa is underlain by the West African craton, an Archaean aged (>2,5Ga) stable crustal block which forms the geological basement in Sierra Leone, Liberia and parts of Guinea, Cote d'Ivoire and Ghana. The core of Archaean sequences is surrounded by younger Palaeo-Proterozoic (2,2Ga-2,0Ga) sedimentary and volcanic units that form narrow (20km to 60km wide), alternating belts of mafic volcanic greenstone units, separated by wider basins of mainly marine clastic sediments. The greenstone belt- sedimentary basin trend is northeast-southwest across central and southern Ghana and can may be traced for hundreds of kilometres along strike (Figure 4). At least five greenstone belts are identified, namely the Ashanti, Asankrangwa, Sefwi, Kibi and Bui belts (Figure 4), which are described in detail in Section 7. The intervening sedimentary basins include from east to west; the Cape Coast Basin, Kumasi Basin and the Sunyani Basin (Figure 4).
 
Graphic
 
 

 
Graphic
 
 
 

 
 
 
Graphic
 
 
 
 

 
 
June 2011
32
 
The five alternating low grade meta-volcanic and meta-sedimentary sequences are classified as the Palaeo-Proterozoic Birimian Supergroup (2,17Ga-2.10Ga), with the Lower Birimian comprising largely meta-sedimentary units and the Upper Birimian comprising mainly meta-volcanics (Figure 4). The meta- volcanic belts are separated by basins containing isoclinally folded dacitic volcaniclastics, wackes and argillitic sediments. The volcanic sequences and sedimentary units were deposited contemporaneously as lateral facies equivalents. The transition zone between greenstone belt volcanics and basin sediments is marked by a chemical facies, which comprises cherts, manganiferous and carbon-rich sediments and carbonates. The margins of the belts exhibit faulting on local and regional scales and these structures played a significant role in the genesis of the gold deposits for which the region is renowned.

Subsequent to the Birimian volcano-sedimentary basin development, the Eburnean tectono-thermal event took place between 2.2Ga and 2.0Ga, which caused deformation and metamorphism of the Birimian Supergroup. The Eburnean orogeny or Eburnean cycle comprised a series of compressional tectonic, metamorphic and plutonic events which resulted in regional faulting, folding of the pre-existing volcano-sedimentary sequences, intrusion by various types of granitoids, upliftment and erosion, as evidenced by the major unconformity dated between 2.15Ga and 2.11 Ga (Figure 4). The erosion products were deposited as sediments of the Tarkwaian Group (2.12-2.14Ga) in long, narrow intra- montane grabens which formed due to rifting preferentially in the central portions of all five Birimian volcanic belts (Figure 4). Each of the Birimian meta-volcanic belts is partially overlain by these younger, Tarkwaian Group clastic meta-sediments consisting of quartzite, shale and quartz pebble conglomerates. In the type area of the Tarkwa District, the 2.5km thick sequence hosts important palaeo-placer gold deposits. Relative stratigraphic relations suggest that deposition of Tarkwaian Group sediments took place as the underlying and adjacent volcanic and sedimentary rocks were undergoing the initial stages of compressional Eburnean deformation.

The Birimian sediments and volcanics were extensively metamorphosed to greenschist facies, although in many areas, higher temperatures and pressures are indicated by amphibolite facies mineral assemblages.

The Eburnean aged granitoids are classified into two major and one minor types, identified as follows
(Figure 4):-

       basin granitoids (Cape Coast type) which occur as syn-orogenic, foliated batholiths chiefly in the central portions of Birimian sedimentary basins. The basin granitoids are
peraluminous and generally granodioritic in composition;

       belt granitoids (Dixcove type) which are late-orogenic, unfoliated intrusions in volcanic belts. The belt granitoids are metaluminous in chemistry and commonly are tonalitic; and

       minor, post Tarkwaian age potassium (K) rich granitoids.

A genetic model to explain the formation of the volcano-sedimentary basins involves small-scale, equi- dimensional, parallel, and contemporaneously operating convection cells in the upper mantle. The convection cells caused rifting of a highly attenuated proto-crust, as well as linear eruptions of tholeiitic magmas to form the Birimian volcanics.

Clastic shallow water sediments of the Neo-Proterozoic Volta Sedimentary Basin cover the northeast of the country (Figure 4) and a small strip of Palaeozoic and Cretaceous to Tertiary sediments occur along
the coast and in the extreme southeast of Ghana

6.2. Local Project Geology
NI 43-101 Item 7 (a)
The Esaase Project area comprises a sequence of intensely folded and faulted Birimian aged meta-sediments. Geological units on the Esaase property have been interpreted through a combination of airborne geophysical resistivity mapping (Versatile Time-Domain Electromagnetic Surveying or VTEM), resource definition drilling and associated outcrop mapping. Stratigraphic correlation between geological units is difficult due to the similarity of lithologies and the intense folding and deformation. However, broad subdivision of the meta-sediments into units with relatively high or low electrical conductivity and resistivity characteristics is possible.
 
Graphic
 
 

 
 
June 2011
33
 
The Esaase mineralisation comprises a system of gold-bearing quartz veins hosted by the tightly folded Birimian age sedimentary rocks. Lithologically the host sequences comprise massive, thinly layered phyllite; interlayered phyllite and siltstone with substantial carbonate in the matrix and massive, thick- bedded sandstone/greywacke. The mineralisation associated with the phyllite host occurs predominantly in the hanging wall of a resistivity break, whilst that associated with the sandstones/greywacke occurs in the footwall of the resistivity break (Figure 5).

6.2.1. Structural Aspects
The structural features of the Esaase Project area have resulted from Eburnean age compressional tectonic events which produced fold-thrust patterning followed by a late stage strike-slip deformation event. The deformational intensity increases systematically from the northwest to the southeast across the Project area as illustrated in Figure 6.

The folding in the deformed Birimian siltstone/shale sequences has a general axial plane strike direction of 020º to 035º and the folds plunge northeast 30º to 70º (Figure 6). The asymmetric folding ranges from open to tight, with isoclinal folds developed locally and the general dip direction is northwest. The folding tightens and deformation increases systematically towards the southeast of the Project area as shear zones are approached and this characteristic is observable on a 10m to a 100m scale. The asymmetry of the folding tilts towards the southeast, which is compatible with a regional interpretation of overall tectonic transport to the southwest (Figure 6).

The intensity of the folding increases with increasing crustal shortening and in these high strain zones, shear zones and thrust faults were developed. The strain within the shear zones is commonly eased by the shearing and the pattern of increasing strain to a point of shearing is repeated throughout the Project area on 10m to 50m scale (Figure 6).

The northeast striking, northwest-dipping syn-kinematic shears roughly parallel fold axial planes. Commonly, the basal shear/thrust separates the more deformed, altered, mineralised and electrically conductive hanging wall siltstone shale unit from the more massively bedded, and less deformed sandstone/greywacke in the footwall. Brecciated carbonaceous material at this contact indicates late brittle fracturing. The resistivity contrast marks the shears on a property wide scale.

The regional structural synthesis by Eisenlohr (1989) concluded that most of the structural elements in the region have common features which are compatible with a single, extended and progressive phase of regional deformation involving substantial northwest-southeast compression.

However, considerable heterogeneity exists locally, and at Esaase Project additional structural evidence indicates that towards the close of the tectonic event, the stress direction changed from northeast to southwest to north to south. The change in stress direction caused left lateral strike-slip movement along pre-existing faults (. The strike-slip movement created a northsouth dilational opening permitting the emplacement of late stage northsouth oriented veins (Figure 6).

The Esaase Project meta-sediments are intruded post-kinematically by younger dykes of intermediate to felsic composition (tonalite to granodiorite) which, towards the southern portion of the Project, are intensely brecciated and occur at or near the footwall of the mineralised units.

The weathering profile on the Esaase Property is strongly influenced by topography. The typical oxidised zone in tropical West Africa consists from surface downwards of surface laterite and ferruginous duricrust followed by saprolite which gradationally merges with oxidised bedrock. In regions of higher elevation at the Esaase Project, the laterite and underlying saprolite are removed by erosional processes and only the oxidised bedrock remains. At intermediate elevations, the weathering profile is mostly preserved and may be covered by transported colluvium. At the lowest elevations, the entire profile is covered by either alluvium or residual tailings from previous alluvial operations.
 
Graphic
 
 

 
Graphic

 
 
 

 
Graphic
 
 
 

 
 
June 2011
36
 
6.2.2. Mineralisation
NI 43-101 Item 7 (b)
The target gold mineralisation on the Esaase property occurs in association with quartz-carbonate veins hosted within parallel, northeast trending, moderately to steeply west dipping units of extremely deformed siltstone/shale. The mineralisation is considered to be mesothermal-orogenic lode type veining produced by a series of fluid influxes which were channelled along lithological, rheological, lithological and structural boundaries.
 
Mineralisation occurred in a series of episodes over most of the duration of the extensive fold, thrust and strike slip deformation events. Four stages of vein development can be identified and these include (Figure 5):-
 
     an early un-mineralised quartz-only episode which has undergone later deformation and brecciation;
 
     a second, early vein episode which consists of numerous fine quartz-carbonate veins which display deformation and truncation by later veining;
 
     a third stage which consists of quartz-carbonate-sulphide veins with visible free gold. The associated sulphide assemblage is generally pyrite, but up to 15% can comprise chalcopyrite and minor arsenopyrite; and
 
     late stage post-mineralisation calcite veins crosscut all previous features
 
Fluid movement throughout the Eburnean tectonic event is evidenced by veining along lithologic boundaries, concentration in fold hinges, veining associated with the shear zones and thrust faults and late stage dilational en echelon veining (Figure 6).
 
The significantly mineralised veins strike generally 350º to 020º with sub vertical dips and are either planar or S-shaped in form. The veins are associated with the shear zones and thrust faults as illustrated in Figure 6 and late stage emplacement in dilation openings to produce en echelon vein sets. The latter veins were emplaced during a transition from fold thrust deformation to left lateral strike slip deformation (Figure 6).
 
Various alteration assemblages are present in the Esaase Project lithological units. A disseminated alteration most commonly present in the oxidised zone comprises a quartz- sericite-pyrite alteration which can be difficult to detect visibly in fresh core. Surface weathering converts the sericite to white kaolinite creating a white alteration product easily distinguished in trenches, road cuts, and drill pads.
 
On a smaller scale, pyrite pseudomorphs can be distinguished. A second alteration stage consists of pervasive carbonate alteration in the form of carbonate porphyroblasts, particularly after andalusite in phyllitic rocks.
 
7. Deposit Type
NI 43-101 Item 8
Most Ghanaian Birimian aged gold occurrences and mines are concentrated in narrow volcanic belts approximately 10km to 15km wide, separated by deep sedimentary basins (Figure 4). The volcanic belts comprise:-

      the Ashanti Belt which has been a world-renowned gold mining region for over 100 years. The main gold deposit is the AngloGold Ashanti Limiteds Obuasi deposit, which began production in 1898. Underground mining operations have exploited vein mineralisation along 7kms of strike to a depth of 1.6km and the total historic and projected in situ gold resources are estimated at 60Moz. Similar vein deposits such as Prestea and Konongo have robust production histories and new million ounce deposits have been discovered along and adjacent to the Ashanti Belt. Tarkwaian Supergroup sedimentary rocks in the southern portion of the Ashanti Belt, host palaeo-placer deposits formed from the pre-existing Birimian aged vein deposits and new discoveries suggest that some Tarkwaian sequences also host vein mineralisation;
 
Graphic
 
 

 
 
June 2011
37

      the Asankrangwa Belt is a 5km to 10km wide belt of northeast-striking, steeply northwest dipping shear zones and minor intrusions that host gold-bearing quartz-carbonate vein systems. The shear zones are similar to those of the Kumasi Basin and are considered the structurally higher continuation of equivalent shear zones in the Kumasi Basin. The shear zones host gold mineralisation in a manner similar to that in gold deposits along the margins of the Ashanti and Sefwi Belts;

      the Kibi Belt is the eastern-most Birimian aged volcanic belt in Ghana, and the belt least explored by modern exploration techniques. The belt is similar to the Ashanti Belt in composition and structure, including the presence of Tarkwaian sedimentary rocks. Gold occurs in veins along shear zones near the margins of the belt in the historic Kibi Mine and the Abu Asafo concession straddles the southwest shear zones in the margin of the belt;

      the Sefwi Belt is a 40km to 60km wide, 220km long, Birimian volcanic belt located north of, and parallel to, the Ashanti Belt. Currently the Sefwi Belt hosts three gold mines, namely the Newmont Limited's Ahafo Mine, Redback Limiteds Chirano Mine and the historic Bibiani Mine, which is now owned by Central African Gold. The Sefwi Belt is dominated by mafic volcanics, metasediments and intrusive granitoids which are bounded by adjacent the adjacent Sunyani sedimentary basin to the west and the Kumasi Basin to the east. Northeast marginal faults are traceable along the full length of the belt which are the prospective structures for mineralisation; and

      the Bui Belt is a 10km to 25km-wide, 150km-long belt located on the western border of Ghana which is parallel to and north of the larger Sefwi Belt. The Bui Belt is bounded by the Maluwe sedimentary basin to the north and the Sunyani Basin to the south. The Bui Belt is defined by a northeast-southwest trending syncline of Tarkwaian meta-sediments. The total thickness is estimated to be 9,000m which is more than 3 times thicker than the comparable units observed in the Tarkwa District.
 
The Birimian aged gold mineralisation within the belts occurs principally as:-

      disseminated mineralisation associated with sulphides, which is generally chemically controlled in specific lithologies; and

      quartz vein mineralisation which is exclusively structurally controlled along faults and shear zones resulting from compressional tectonic episodes, particularly along the margins of belts such as the Ashanti and Sefwi Belts.

The target Esaase Project mineralisation belongs to the latter category and is classified as a mesothermal orogenic quartz vein deposit. Such mesothermal orogenic deposits are associated with Precambrian and Phanerozoic convergent plate boundaries and are hosted in sequences generally metamorphosed to greenschist facies.

The mineralisation is carried by gold-sulphide enriched fluids which are strongly structurally controlled in crustal scale deformation features such as shears and thrust faults. The fluids responsible for the mineralisation can be generated by deep circulating meteoric water, magmatic fluids associated with tonalite/granodiorite intrusions and fluids associated with metamorphic events.

Orogenic gold deposits are the most significant style of mineralisation in West Africa and are commonly referred to as Ashanti-type deposits as the Obuasi area, within the Ashanti belt, is the type locality and the largest gold deposit in the region. The deposits are confined to tectonic corridors that are often >50km long and up to several kilometres wide and display complex, multi-phase structural features, which control the mineralisation. The most common host rock is fine-grained meta-sediment, often in close proximity to graphitic, siliceous, or manganiferous chemical sediments. However, mafic volcanics and later intrusions are also known to host significant gold occurrences.

Refractory deposits feature early-stage disseminated sulphides in which pyrite and arsenopyrite host gold mineralisation. The early mineralisation is overprinted by extensive late stage quartz veining in which visible gold is quite common and accessory polymetallic sulphides are frequently observed. These deposits include important lode/vein deposits in Ghana such as at Obuasi, Prestea, Bogosu, Bibiani and Obotan.
 
Graphic
 
 

 
 
June 2011
38

A non-refractory style of gold mineralisation occurs in which gold is not hosted within sulphide minerals either in early or late stage mineralisation. These type deposits have lower sulphide content in general and in particular, lack the arsenopyrite that is common in the refractory type deposits. Such deposits include the Chirano and Ahafo type deposits.

The Esaase Project exploration programme was specifically designed to investigate the structural features of the area as this is the primary control on mineralisation. The combination of geophysical approaches together with the drilling programme successfully delineated the Esaase mineralisation in parallel northwest trending mineralised structures.


8. Exploration
NI43-101 Item 9 (a), (b), (c), (d)
Minimal exploration was conducted on the Esaase Project area prior to the exploration programmes conducted by
Keegan Resources in 2006.

8.1. Geophysical Programmes
An IP survey was completed in 2006 which successfully identified significant faults which are considered
to be significant mineralisation boundaries (Figure 6 and Figure 7). In order to identify additional structures, Keegan Resources contracted Geotech Limited (Geotech) to perform an airborne VTEM geophysical programme over the Project area. The survey was conducted between 11 October and 25 October 2007. The principal geophysical sensors included Geotechs VTEM system and ancillary equipment included a Global Positioning System (GPS) and a radar altimeter. A total of 2,266 line-kms were flown at nominal traverse line spacings of 200m and flight line directions were N130°E/N50°W. The helicopter maintained a mean terrain clearance of 122m.
 
In-field data processing, involved quality control and compilation of data collected during the acquisition stage, using the in-field processing centre established in Ghana. The data was processed and interpreted by Condor Consulting Incorporated (Condor) which performed AdTau time constant analysis on line data in order to determine the best time delay channels to use. Condor performed Layered Earth Inversions (LEI), generated depth slices for the survey and characterised the 2D and 3D nature of the survey.
 
The 10 channel map shown in Figure 7 is a relatively deep penetrating channel that avoids noise disturbance and provides an overall picture of the resistive characteristics of the rocks. The 92m Layered Earth Inversion is useful for a more detailed view of bedrock resistivity at the fresh bedrock surface.

8.2. Soil Sampling Programme and Sampling Methodology
Keegan Resources commenced a soil sampling programme of the Esaase and Jeni Concessions in June 2006 which produced an assay database of 6,100 soil samples relating to these concessions. Sampling was undertaken on northeast oriented grid lines, spaced 100m to 400m apart with samples taken at 25m intervals. In addition 1,630 soil samples were collected from the Dowahodo prospecting licence.

The sampling methodology included the following protocols:-

       soil samples were taken only in areas where no obvious disturbance by alluvial miners was evident;

       care was taken to sample below the organic horizon;
 
       the soil samples below the organic horizon on ridge tops or steep slopes from higher elevations comprises weathered bedrock, whereas the samples nearer to the alluvial stream bed comprises colluvium and/or saprolite; and
Graphic

 
 

 
 
 
Graphic

 
 
 

 
 
June 2011
40

       drilling and trenching indicate that soil samples from weathered bedrock, on average, have gold contents within an order of magnitude of the underlying bedrock values. Soil samples from non bedrock sources (i.e. alluvial) tend to have much lower gold values than the underlying bedrock. As a result of this observation, Keegan Resources used auger sampling programs in order to get samples at or closer to the saprolite/soil interface.

The summarised results of the programme are presented in Figure 8 and clearly support the mineralisation model of parallel northwest trending mineralised structures.

8.3. Sampling Methodology for the Drilling Programme
See Section 9

8.4. Bulk Density Determinations
Bulk density determinations have been undertaken over a range of lithologies and oxidation states. The procedure is typical of bulk density determinations based on the Archimedes Principle of weight "in-air" versus weight "in-water". A custom set of bulk density scales with a weighing hook located underneath supplied by Corstor (South Africa) was utilised for the measurements:-

       10cm billet of clean dry (dried in an oven for 4 hours at 60° C) core is weighed;
 
       core is immersed in paraffin wax then reweighed to establish weight of the wax; and
 
       core is then suspended and weighed in water to determine the volume.
 
The bulk density is then calculated as:-

Bulk density core = [Mass core] / [(Mass air - Mass water) - (Mass wax / 0.9)].

9. Drilling
NI 43-101 Item 10
The drilling programme conducted at the Esaase Project focused mainly on the northwest striking gold bearing
structures in the Esaase concession but in addition, targets on the Jeni, Dawohodo and Mpatoam concessions were drilled. The drilling programme entailed both surface reverse circulation (RC) and diamond core (DC) drilling methods focused on the targets identified by soil sampling, trenching and geophysical interpretations. The DC and RC drilling programmes were conducted by independent Eagle Drilling Contractors and Geodrill Contractors both of which are reputable Ghana-based companies providing RC and DC drilling services consistent with current industry standards. The drilling programmes were supervised by Keegan Resources permanent staff qualified geologists.

A total of 1,496 drillholes were completed on the Project area. The drillhole collar positions are presented in Figure 8 and the vast majority of the drillholes into the west dipping mineralisation were collared at an orientation of approximately 100º (UTM). A small number of drillholes were drilled towards approximately 300º. Of these, 1,187 drill holes in the currently defined resource area were used for the resource estimation study.

9.1. Diamond Core Drilling Procedures
NI 43-101 Item 10 (a)
The initial 14 diamond drillholes (HQ and NQ diameters) were completed by Eagle Drilling using a Longyear 38 skid-mounted diamond drill. All subsequent drilling was completed by Geodrill using UDR650 and UDR900 multipurpose rigs for the RC and DC drilling. Diamond-drilled core was oriented by a combination of the spear technique, the 2iC Ezymark orientation device and Reflex ACT II electronic orientation system. Drillhole collars were surveyed by a Coffey Mining surveyor utilising a Thales Promark 3 DGPS unit.
 
Graphic
 
 

 
 
June 2011
41

9.2. RC Drilling Procedures
NI 43-101 Item 10 (a)
The RC drilling was completed by Geodrill Contractors using a UDR KL900-02 multipurpose track mounted rig. The RC rods were 4½ inch diameter and the drill bit used was a standard 140mm diameter face sample hammer.

9.3. Topographic Control
Topographic models of the Esaase Project area have been generated as follows:-

       a total station survey was completed by Coffey Mining surveyors in 2007 over the primary deposit to an accuracy of +/-30cm and the survey compares well with the drillhole collar survey data; and

       a topographic model to a 2m contour interval was generated in several stages for the entire group of concessions by Photosat Information Limited using stereo pairs of IKONOS satellite images collected in December 2007 and July 2008. These images were ortho-rectified to control points including all drillhole collar points at the time surveyed by surveyors working for Asanko.
 
9.4. Downhole Surveying Procedures
The drillholes were surveyed on approximately 50m or less downhole intervals, using a Reflex EZ-Shot®, an electronic single shot instrument manufactured by Reflex of Sweden. These measurements have been converted from magnetic to UTM Zone 30 North values. The factor used to convert between the two grids is -5 degrees.

9.5. Sampling Procedures
 
9.5.1. RC Sampling and Logging
The drill chips from the RC drilling programme were collected in 1m intervals downhole via a cyclone which discharged into PVC bags. The collected samples were weighed prior to splitting and then were riffle split using a three tier Jones riffle splitter. A final sample of approximately 3kg was collected for submission to the laboratory for analysis. The RC chip material was stored in trays which were systematically compiled and logged with all bulk rejects stored at the Asanko Golds exploration camp in the village of Tetrem. All 1m interval samples were submitted for analysis.

9.5.2. Diamond Core Sampling and Logging
The sampling of the core was subject to the discretion of the geologist completing the geological logging. Early in the exploration, nominal 2m intervals samples were taken unless otherwise dictated by geological or structural features. After December 2006, the sample interval was 1m intervals with the majority (90.7%) of samples submitted to the laboratory as half core and the remaining submitted as whole or quarter core.

The sampling intervals are significantly smaller than the true width of overall mineralised zones, which is variable throughout the deposit, but is typically in excess of 30m.

The required interval was marked on the core and the sample cut in half by electric diamond blade core saw. The standard protocol is that the cut is made 1cm to the right in a downhole direction of the orientation line, with the left side being retained and the other half broken up for assay. In the upper oxide zone, where the core was too friable for diamond saw cutting, the procedure was to dry cut or cleave the core.

The structure orientations noted in the core were routinely recorded to assist in determining the controls on mineralisation, in establishing a reliable geological model for resource estimation, and to provide additional geotechnical information to determine likely blast fragmentation and pit stability characteristics.

Graphic
 
 

 
 
Graphic
 
 

 
 
June 2011
43

The core was transferred from the trays and pieced together on a V-rail (angle iron) rack. The orientation line (bottom of hole), determined by the orientation tool recorded during drilling, was drawn along the entire length of the assembled core.

Geotechnical logging has recorded percentage core recovery, lithology, weathering and oxidation, rock strength, RQD percentage and rock defects including frequency, orientation, type and characteristics. A set of metallurgical drillholes of approximately 28 oriented HQ3 core drillholes were drilled radially outward from within the deposit through depths beyond an assortment of potential pit wall limits.

9.5.3. Recovery
The sample recovery for the RC drilling averages approximately 34kg per metre drilled. Bulk sample weights (on a per metre basis) have been recorded in the database for approximately two thirds of all RC samples drilled. Sample recovery in DC drillholes was good although in the moderate to highly weathered saprolite and highly fractured and brecciated zones poor recoveries were experienced. Asanko Gold began utilising HQ3 drilling to minimise the core loss in the weathered and transition zones after July 2008.

Recovery factors are unlikely to materially affect the accuracy and reliability of the results.

9.5.4. Sample Quality
The Keegan Resources sampling procedures adopted for the drilling programmes are consistent with current industry best practise. Samples collected by DC drilling within the highly weathered zones are of moderate quality, with the remainder being of good quality. Sample recoveries and quality for the RC drilling are high with drilling switching to diamond core once wet samples were noted.
 
A quality control twin drillhole exercise was undertaken to determine if any negative bias resulted in the DC drilling due to the use of water. A number of the DC drillholes had poor recovery in the highly weathered zone and potential exists to wash out fine gold and therefore underestimate the gold content. Four DC and RC drillhole pairs were suitable for comparison and results indicate comparable intervals of mineralisation with broadly equivalent grades between DC and RC drilling.
 
10. Sample Preparation, Analysis and Security
NI 43-101 Item 11
Sample preparation and assaying of samples from the Esaase Project have to date been undertaken at three independent laboratories:-

       SGS Tarkwa (SGS) (from April 2007): part of the global group of SGS laboratories with ISO/IEC 17025 accreditation;

       Transworld Tarkwa (TWL) (from October 2006): TWL Tarkwa was acquired by Intertek Minerals Group in October 2008. Intertek Minerals Group includes Genalysis Laboratory Services Pty Limited of Australia and operates in accordance with ISO/IEC 17025, which includes the management requirements of ISO 9001:2000; and

       ALS Kumasi (from November 2007) ALS Laboratory Group with ISO 9001:2000 accreditation:


10.1. Sample Security
NI 43-101 Item 11 (a)
Asanko Gold sampling protocols require samples to be collected in staple-closed bags, transported to the Project camp to be collected by the laboratory vehicle, at which point the laboratory assumes responsibility and transports the consignment to the laboratory directly. The samples submission procedures are supervised by Asanko Gold technical staff and the rapid submission of samples provides little opportunity for sample tampering. Equally, given the umpire assaying via an external international laboratory and the regular blind submission of international standards to both the primary and umpire assay facilities, any misleading analytical data would be readily recognised and investigated.
 
Graphic
 
 

 
 
June 2011
44

10.2. Field Quality Control Measures
NI 43-101 Item 11 (a), (b)
Duplicate samples are routinely collected by Asanko Gold to assess field sampling error or bias and acceptable reproducibility of RC field duplicate data indicates no bias in the sampling. Standard internationally certified reference material (CRM) is used as a measure of accuracy and assessment of the data indicates that the assay results are generally consistent with the logged alteration and mineralisation, and are entirely consistent with the anticipated tenor of mineralisation (Coffey Mining 2009, Minxcon 2012). The following Quality Control Measures are standard Asanko Gold protocols:-

       insertion of 16 (Geostats Standards and CDN Resource Standards) internationally CRMs (5% of samples);

       insertion of blank material (5% of samples);
 
       RC field duplicates taken (5% of samples);
 
       diamond drillhole duplicates from second split at the 3mm jaw crushing stage;
 
       submission of selected umpire samples; and

       review of the Asanko Gold and the internal laboratory QC data on a batch by batch basis.
 
10.3. Laboratory Sample Preparation Methodology
NI 43-101 Item 11 (b)
The various sample preparation techniques undertaken at the three independent laboratories are summarised and compared in Table 7:-
 
Table 7 : Sample Preparation Methodologies
 
ASPECT OF
SAMPLE
PREPARATION
SGS TARKWA
 
LABORATORY
 
ASL KUMASI LABORATORY

TRANSWORLD TARKWA
 
LABORATORY
Sample size
3kg sample
3kg
3kg sample
Drying
Dried and disaggregated
Dried and disaggregated
Dried and disaggregated
Crushing
Jaw crushed to 3mm
Jaw crushed to 2mm
Jaw crushed to 3mm
 
Pulverised to nominal 95%
Pulverised to nominal 85%
Pulverised to nominal 95%
Pulverising
passing -75µ using LM2
passing -75µ using LM2
passing -75µ using LM2 pulveriser
 
pulveriser
pulveriser
 
Pulp samples
Two samples retained for
Two samples retained for
Two samples retained for analysis
 
analysis and storage
analysis and storage
and storage
 
50g charge, fire assay
50g charge, fire assay fusion,
 
 
fusion, lead collection, AAS
lead collection, AAS
50g charge, fire assay fusion, lead
Analysis
   
collection, AAS determination to
 
determination to 0.1ppm
determination to 0.1ppm
0.1ppm detection limit
 
detection limit
detection limit
 
Source ;: Coffey Mining 2011, Minxcon 2012
 
The sample preparation and analytical procedures adopted to date are consistent with current industry practise and are considered by Minxcon to be acceptable for the style of mineralisation identified at Esaase Project. Venmyn Deloitte concurs with this opinion.

10.4. Laboratory Quality Control and Quality Assurance Measures
NI 43-101 Item 11 (a), (b), (c)
The quality control measures undertaken at each of the internationally accredited laboratories are summarised in Table 8:-
 
Graphic
 
 

 
 
June 2011
45
 
Table 8 : Laboratory Quality Control Measures
 
CONTROL MEASURES
 
SGS TARKWA
 
ASL KUMASI
TRANSWORLD TARKWA
Sample identification
Cross referencing of sample identification tags and client submission sheets
Cross referencing of sample identification tags and client submission sheets
Similar to SGS Tarkwa
Cleaning equipment
Compressed air gun used to clean crushing and milling equipment between samples
Compressed air gun used to clean crushing and milling equipment between samples
 
Contamination prevention
Barren „wash‟ material applied to the milling/pulverising equipment at between sample preparation batches
Barren „wash‟ material applied to the milling/pulverising equipment at between sample preparation batches
 
Contamination assessment
Quartz washes assayed prior to use to determine the level of cross contamination
Quartz washes assayed prior to use to determine the level of cross contamination
 
Sieve tests
Sieve tests carried out on pulps at the rate of 1:50 to ensure adequate size reduction
Sieve tests carried out on pulps on a regular basis to ensure adequate size reduction
 
CRM
Assaying of certified standards at the rate of one per batch of 20
Assaying of certified standards at the minimum rate of one per batch (dependant on batch size and assay technique)
 
Duplicate samples
A minimum of 5% (1:20) of the submitted samples in each batch are subject to repeat analysis
A minimum of one of the submitted samples in each batch are subject to repeat analysis
 
Blank samples
Blank samples inserted at the rate of approximately 1:30
Blank samples inserted at the beginning of each batch
 
CRM
Industry recognised certified standards disguised and inserted at a rate of 1:30
 
Internal CRM
Assaying of internal standards data
 
Umpire checks
Participation in two international round-robin programs; LQSi of USA and Geostats of Australia
Participation in a number of international round-robin programs which include CANMET of Canada and Geostats of Australia
 
Source ;: Coffey Mining 2011, Minxcon 2012


10.5. Quality Control Analysis
NI 43-101 Item 11 (c)
Detailed independent analysis of the quality control data was originally undertaken by Coffey Mining 2011 and reviewed by Minxcon 2012. The data included:-

       field and laboratory standards and blanks for RC and diamond drillhole data;
 
       laboratory duplicates;
 
       re-assayed pulps and
 
       umpire assaying.
 
The quality control data was statistically assessed to determine relative precision and accuracy levels various sets of assay pairs and the quantum of relative error. The statistical analysis included the use of the following comparative statistical methodologies and a summary of the results is presented in Table 9 :-

       Thompson and Howarth Plot showing the mean relative percentage error of grouped assay pairs across the entire grade range, used to illustrate precision levels by comparison against given control lines;

       Rank %HARD Plot, which ranks all assay pairs in terms of precision levels measured as half of the absolute relative difference from the mean of the assay pairs (% HARD), used to illustrate relative precision levels and to determine the percentage of the assay pairs population occurring at a certain precision level;

       Mean vs. %HARD Plot, used as another way of illustrating relative precision levels by showing the range of %HARD over the grade range;

       Mean vs. %HARD Plot is similar to the above, but the sign is retained, thus allowing negative or positive differences to be computed. This plot gives an overall impression of precision and also shows whether or not there is significant bias between the assay pairs by illustrating the mean percentage half relative difference between the assay pairs (mean %HARD);
 
Graphic
 
 

 
 
June 2011
46
 
       Correlation Plot is a simple plot of the value of assay 1 against assay 2 which provides an overall visualisation of precision and bias over selected grade ranges. Correlation coefficients are also used; and

       Quantile-Quantile (Q-Q) plots which are a means whereby the marginal distributions of two datasets can be compared. Similar distributions should be noted if the data is unbiased.


10.5.1. Umpire Laboratory Assay Results
NI 43 - 101 Item 11 (c)
In January and February 2007 a total of 1,197 RC samples were re-split and sent for analysis at SGS Tarkwa. Only assays >0.1g/t Au were considered in the analysis and a total of 481 assay pairs were available for analysis. Results show a significantly lower mean (by 15.6%) for analysis completed at SGS, although this significantly reduces if outliers to the data are removed. SGS Tarkwa has been utilised as a primary laboratory for the Project since February 2007 and umpire samples numbering 1,633 have subsequently sent to Genalysis of Perth for umpire analysis. Only assays >0.1g/t Au were considered in the analysis and a total of 1,572 assay pairs are available for analysis.

Results show equivalent assay means for the pairs between ALS and Genalysis and between SGS and Genalysis. The means of the assay pairs between TWL and Genalysis show high bias for TWL, a finding which is supported by Standards analysis. Precision is less than
acceptable for all comparisons and this requires investigation

10.5.2. Quality Control and Assurance Conclusions
NI 43-101 Item 11 (d)
Minxcon is of the opinion that the quality control and assurance undertaken by Coffey Mining is adequate and that the current protocols to monitor the precision and accuracy of the sampling and assaying are adequate and should continue to be implemented. Pertinent conclusions from the analysis of the available QA/QC data include:

     use of CRM has shown a significant relative low bias for SGS Laboratories, Tarkwa;

     use of CRM has shown a relative high bias for Transworld Laboratories, Tarkwa and this interpretation is supported by the umpire analysis programme;

     repeat analyses have confirmed that the precision of sampling and assaying is generally within acceptable limits for sampling of gold deposits; and

     umpire analysis at Genalysis in Perth has shown a lack of precision between the various laboratories. This is currently unexplained and requires investigation.
 
Graphic
 
 

 
 
June 2011
47

Table 9 : Quality Control and Assurance Data Analysis
 
CONTROL MEASURES
SGS TARKWA LABORATORY
ASL KUMASI LABORATORY
TRANSWORLD TARKWA LABORATORY
Duplicate samples/splits
RC (339) and diamond core (73) duplicates - second split at the 3mm jaw crushing stage of the sample preparation. Also four random repeats in every batch of 50 samples
RC (176) and diamond core (62) duplicates a-second split at the 3mm jaw crushing stage
Every 20 samples repeated. Only assays >10xs the detection limit are included in the analysis.
Results
Results for both duplicate sets show equivalent means and a high level of precision between the original and the re-assay for both diamond core and RC samples.
Results show equivalent means and a high level of precision between the original and the re-assay for the diamond core samples however the second mean is 7.5% lower than the original assay.
Results show equivalent means between the duplicate repeats and precision within acceptable limits for both diamond core and RC samples
AAS Pulp re-spray
 
   
Every 10 samples are repeated. Only assays >10xs detection limit (0.1ppm Au) are included. 1202 assays in dataset
Results
 
   
Results show equivalent means between the duplicate repeats and precision well within acceptable limits
Random repeat assays
Random repeat assay with four random repeats completed from each batch of 50 samples. A total of 582 Diamond core and 2,392 RC analyses are available for analysis.
Random repeat assays RC (892) DD (223)
 
 
Results
Results show equivalent means and an acceptable level of precision between the original and the re-assay
Results show equivalent means for diamond core however the second mean for the RC samples is significantly lower than the original. Overall levels of precision between the original and the Re-assay are low for both diamond core and RC samples.
 
High grade check repeats
   
50g samples from the original sample envelope. Check analyses to 2007 available.
Results
 
   
Results show equivalent means between the duplicate repeats and precision within acceptable limits for both diamond core and RC samples
Pulp re-assay
 
   
Only pulp re-assays > 10xs the detection level (0.1ppm Au) considered 1,615 riffle split 1m RC drill chip assays
Results
 
   
Results show equivalent means between the duplicate repeats and precision within acceptable limits.
Laboratory standards and blanks
Four certified standards were inserted by SGS into the sample batches at a rate of one in twenty in addition to preparation blanks and reagent blanks at a similar rate. The supplied database only contains lab standards analysis received to September 2007.
A total of 16 Certified standards and one blank have been included in sample batches sent to TWL, ALS and SGS. A total of 11,507 assays were available for analysis.
TWL Lab Standards and Blanks Analysis six certified standards were inserted by TWL into the sample batches at a rate of one in twenty in addition to preparation blanks and reagent blanks at a similar rate
Results
A total of 938 standards and blanks assays are available for analysis. Results show a relative low bias of up to -2.09%.
Blind standards analysis at ALS shows a spread of bias from -3.65% to 5.64%. Negative bias is apparent at lower grades and positive bias up to 5.64% is seen in two standards at 2.58 g/t Au and 2.74 g/t Au. For higher grade samples the bias approaches zero.
TWL Lab Standards and Blanks Analysis six certified standards were inserted by TWL into the sample batches at a rate of one in twenty in addition to preparation blanks and reagent blanks at a similar rate
Field Blanks
1163 blanks included
2802 blanks included
1567 blanks included
Results
Results show equivalent means and acceptable precision for both RC and diamond core samples
Results show equivalent means and acceptable precision for both RC and diamond core samples
Results show equivalent means and acceptable precision for both RC and diamond core samples
Source ;: Coffey Mining 2011, Minxcon 2012
 
Graphic
 
 

 
 
June 2011
48
 
11. Data Verification
NI 43-101 Item 12 (a), (b), (c)
Verification of the collar positions of drillholes, drillhole survey data and checks of lithological logging of the drillhole intersections was undertaken by Coffey Mining in 2011.

Reviews of the drilling, sampling, QA/QC databases were undertaken both by Coffey Mining 20011 and Minxcon 2012. The Mineral Resource estimation was based on the available exploration drillhole database which was validated by Minxcon prior to commencing the 2012 resource estimation study. Data included samples from extensive trenching, but only the RC and diamond drilling sample data were included for use in the modelling process. A total of 1,187 drillholes and 233,503 composite samples were used for the resource estimation.
Checks made to the database prior to modelling included:-

       no overlapping intervals;
 
       downhole surveys at 0m depth;

       consistency of depths between different data tables; and

       checks for any gaps in the data.
 
The application of the surface drillhole data is adequate for the geostatistical estimation processes employed in the mineral resource estimation. The data is spatially well represented and of an adequate support level for  stimating deposits of this nature (Minxcon 2012) The procedures and codes of practice employed by Asanko Gold personnel with regard to geological logging, sample preparation and analytical procedures conform to industry standards and are therefore adequate for use in geological modelling and geostatistical estimation.


12. Mineral Processing and Metallurgical Testwork
NI 43-101 Item 13
The 2011 PFS for the Esaase Project was based on an open pit mining methodology with an associated "whole-ore" leach processing plant. The study included initial mill throughputs of 9Mtpa reducing to 7.5Mtpa once mining of the fresh zone began. The 2011 PFS resulted in a positive NPV for the Project but additional studies indicated that better economic outcomes could be achieved with alternative process design methodologies. As a consequence, Asanko Gold completed a Concept Study in August 2012 with a revised project scope which included a flotation process in contrast to the "whole-ore" leach used in the 2011 PFS. The Concept Study indicated that an improvement of approximately USD80m could be achieved on the Project NPV. In September 2012 Asanko Gold appointed DRA to undertake the revised, update 2013 PFS.

12.1. Previous Metallurgical Testwork and Processing Studies
NI 43-101 Item 13 (a)
The Coffey Mining/Lycopodium 2011 study included four phases of testwork, including mineralogy, and testing of processes for oxide, transitional and fresh ore types. The gold appears to be generally free milling and coarse enough for mill/gravity recovery of a significant component, however there is a fine grained component included within sulphide particles which was shown to be less amenable to conventional processing.

A summary of the four phases of metallurgical testwork undertaken for the 2011 PFS, the results of thetestwork and the consequential design modifications are summarised in Table 10:-
 
Graphic
 
 

 
 
June 2011
49
 
Table 10 : Summary Previous Metallurgical Testwork Phases I to IV
 
PHASE
TESTWORK SCOPE
SAMPLES
TESTS
RESULTS
COMMENTS
Phase I (2008 - 2009)
Diagnostic testing of oxide, transition and fresh ore not aimed at plant design criteria
Individual core sections
Cyanide leach tests at a grind of 80% passing 45μ - residence time 48hrs
Recovery oxide -91.0% Recovery transition 71%
Recovery Fresh 54.-%
Low recoveries in fresh and transition due to coarse gold and indicated the need to include gravity recovery
Cyanide leach tests at a grind of 80% passing 150μ for gravity/flotation circuit with leaching of the tailings
 
Increase in overall recovery to 92%
 
 
Cyanide leach tests at a grind of 80% passing 75μm for gravity/flotation circuit with leaching of the tailings
 
Increase in overall recovery to 97%
 
 
Phase II (2009)
Develop Concept Study process flowsheet comprising comminution, gravity concentration and CIL on gravity tailings -48hr residence time. Variability between fresh and oxide
Composite samples of remaining core from Phase I - two composite samples one of of fresh and the other of oxide
Cyanide leach tests at a grind of 80% passing 150μm - gravity concentration followed by and CIL (48hr residence time) on tailings
Recovery oxide -94.80%
Recovery Fresh 95.5%
Gravity concentration did not include Mozley tabling and therefore the recoveries are considered to be overstated
Cyanide leach tests at a grind of 80% passing 75μm - gravity concentration followed by CIL (48hr residence time) on tailings
 
Recovery oxide -96.9%
Recovery Fresh 97.0%
 
Phase III (2009 - 2010)
Detailed design parameters for fresh and oxide ore types. Process included comminution, gravity concentration, leaching of gravity concentrate and CIL on tails
Representative composites and individual PQ sized intercepts at differing strike positions and depths
Grind size optimisation studies
Optimum of 80% passing 150μ
 
 
CIL optimisation comparing 24hr residence time, NaCl addition to maintain 500mg/L in solution and pulp density of 50% solids
   
Whole ore CIL without gravity
 
Reduced recoveries due to coarse gold
 
Gravity concentration revised to upgrade Knelson concentrate using Mozley concentrator
Results presented in Table 11The reduced recoveries were attributed to un-liberated gold in the Mozley tailings
Conclusion that grinding the Mozley tails would improve recovery
Variability testing on optimised conditions for oxide, transition and fresh
Results presented in Table 11. Focus to be on identifying process techniques that could recover the equivalent of Mozley tails
Resultant enhanced gravity separation test work phase which looked at Wilfley table testing and flotation
Phase IV
Addition to Phase 111 with 'extended gravity' to improve recovery of ultrafine sulphide associated gold. The process flow included comminution, gravity concentration and leaching of gravity concentrate, gravity concentration of mill product with spirals and CIL on thickened spiral concentrate
Remaining material from Phase III
Grind size optimisation studies
Optimum of 80% passing 106μm
DRA considers more significant benefit to recovery at a target grind size of 80% passing 75μm which was most apparent for the oxide material
Gravity circuit that included enhanced gravity separation using a Wilfley table to replicate spirals
Enhanced gravity circuit
 
 
Enhanced gravity circuit tested to define the CIL parameters at 24hr residence time, NaCl addition to maintain 350mg/L in solution and pulp density of 50% solids
   
Variability testing on enhanced gravity flowsheet and optimised conditions for oxide, transition and fresh material
See Table 12
 
 
Source : DRA 2013, Coffey/Lycopodium 2011
 
Graphic
 
 

 
 
June 2011
50
 
Table 11 : Phase 111 Variability Testwork Results for Fresh and Oxide Material
 
 
SAMPLE ID
 

 
CALCULATED
HEAD GRADE
(g/t)

 
MOZLEY Au
RECOVERY
(%)

KNELSON AND MOZLEY
 
OVERALL
EXTRACTION
(%)

 
NaCN
 
(kg/t)

 
LIME
 
(kg/t)

TAILININGS CIL
   
EXTRACTION
(%)
RESIDUE
(g/t)
KEDD 721 Fresh
0.37
43.20
40.50
0.06
83.78
1.18
0.16
KEDD 723 Fresh
2.85
80.00
15.40
0.13
95.44
0.77
0.17
KEDD 729 Fresh
0.22
18.20
63.60
0.04
81.82
0.89
0.10
KEDD 751 Fresh
0.69
4.30
82.60
0.09
86.96
0.87
0.09
KEDD 753 Fresh
0.95
28.40
57.90
0.13
86.32
0.95
0.09
KEDD 754 Fresh
0.56
30.40
55.40
0.08
85.71
1.05
0.15
KEDD 763 Fresh
0.43
20.90
58.10
0.09
79.07
0.90
0.09
KEDD 536 Fresh
0.98
3.10
74.50
0.22
77.55
1.02
0.12
KEDD 537 Fresh
1.10
24.50
42.70
0.36
67.27
1.05
0.11
KEDD 538 Fresh
0.76
9.20
72.40
0.14
81.58
0.88
0.12
KEDD 539 Fresh
1.20
2.50
84.20
0.16
86.67
0.84
0.10
KEDD 540 Fresh
0.96
37.50
50.00
0.12
87.50
0.83
0.09
KEDD 541 Fresh
1.11
34.20
50.50
0.17
84.68
0.88
0.10
KEDD 542 Fresh
1.17
8.50
75.20
0.19
83.76
0.80
0.10
KEDD 552 Fresh
1.70
30.00
55.30
0.25
85.29
0.84
0.11
KEDD 657 Fresh
0.98
19.40
67.30
0.13
86.73
0.85
0.21
KERC 671 Fresh
1.19
2.50
76.50
0.25
78.99
0.90
0.11
KEDD 946 Fresh
0.42
2.40
69.00
0.12
71.43
0.89
0.07
KEDD 947 Fresh
1.47
2.70
91.20
0.09
93.88
0.78
0.05
KEDD 419 Fresh
0.79
1.30
74.70
0.19
75.95
0.81
0.12
KEDD 552 Fresh
0.59
32.20
57.60
0.06
89.83
0.67
0.11
KEDD 582 Fresh
0.94
31.90
52.10
0.15
84.04
0.75
0.33
KEDD 760 Fresh
1.36
32.40
59.60
0.11
91.91
0.98
0.20
KEDD 831 Fresh
0.96
5.20
86.50
0.08
91.67
0.75
0.11
KERC 221 Fresh
1.14
56.10
36.00
0.09
92.11
0.78
0.12
KERC 281 Fresh
0.97
43.30
44.30
0.12
87.63
0.87
0.15
KERC 504 Fresh
0.45
4.40
57.80
0.17
62.22
0.92
0.14
KERC 243 Fresh
1.00
39.00
46.00
0.15
85.00
0.76
0.13
KERC 244 Fresh
0.49
2.00
77.60
0.10
79.59
0.82
0.12
KERC 245 Fresh
0.86
27.90
52.30
0.17
80.23
0.70
0.42
KEDD 721 Oxide
0.76
11.80
56.60
0.24
68.42
0.90
0.35
KEDD 723 Oxide
1.52
21.10
59.90
0.29
80.92
0.87
0.30
KEDD 729 Oxide
1.70
58.20
28.80
0.22
87.06
0.92
0.16
KEDD 722 Oxide
1.91
23.60
64.90
0.22
88.48
0.83
0.21
KEDD 724 Oxide
0.73
32.90
57.50
0.07
90.41
0.85
0.32
KEDD 727 Oxide
1.20
14.20
78.30
0.09
92.50
0.83
0.19
KEDD 728 Oxide
0.71
5.60
70.40
0.17
76.06
0.62
0.16
KEDD 730 Oxide
0.92
27.20
57.60
0.14
84.78
0.92
0.19
KEDD 749 Oxide
0.99
25.30
59.60
0.15
84.85
0.85
0.37
KEDD 750 Oxide
1.15
25.20
64.30
0.12
89.57
1.12
0.20
KEDD 751 Oxide
0.72
41.70
50.00
0.06
91.67
0.93
0.17
KEDD 752 Oxide
0.85
25.90
63.50
0.09
89.41
1.36
0.35
KEDD 763 Oxide
1.66
18.70
55.40
0.43
74.10
0.85
0.20
KERC 581 Oxide
0.71
40.80
45.10
0.10
85.92
0.98
0.67
KERC 649 Oxide
1.78
23.00
61.20
0.28
84.27
1.07
0.91
KERC 660 Oxide
2.30
23.90
60.90
0.35
84.78
0.96
0.13
KERC 746 Oxide
1.13
18.60
54.90
0.30
73.45
0.88
0.13
KEDD 946 Oxide
0.93
10.80
62.40
0.25
73.12
1.07
0.27
KEDD 419 Oxide
0.35
8.60
60.00
0.11
68.57
0.95
0.61
KERC 221 Oxide
0.53
7.50
79.20
0.07
86.79
0.88
0.37
KERC 281 Oxide
0.69
7.20
76.80
0.11
84.06
0.97
0.28
KERC 504 Oxide
0.66
43.90
40.90
0.10
84.85
0.79
0.22
KERC 243 Oxide
1.89
5.30
77.20
0.33
82.54
1.04
0.86
KERC 245 Oxide
0.59
25.40
57.60
0.10
83.05
1.02
1.40
KERC 310 Oxide
0.45
0.00
73.30
0.12
73.33
1.27
1.03
Source : DRA 2013; Coffey Mining Lycopodium 2011
 
Graphic
 
 

 
 
June 2011
51

Table 12 : Phase 1V Metallurgical Testwork Summary Results
MATERIAL TYPE
HEAD GRADE(g/t Au)
*PLANT GOLDRECOVERY (%)
**CIL NaCN(kg/t)
LIME(kg/t)
Oxide
1.051
92.80%
0.40
0.52
Transition
1.093
92.10%
0.43
0.60
Fresh
1.084
89.70%
0.54
0.68
Source : DRA 2013; Coffey Mining Lycopodium 2011
*Includes a recovery discount for scale-up and solution gold losses in full scale plant operations
**NaCN consumption excludes cyanide required for leaching gravity and spiral concentrates
 
As a result of the four phases of testwork the final 2011 process was specified to include Semi Autonomous Grinding mill (SAG) and secondary ball milling, gravity gold recovery from the milling circuit and spiral concentration of the milled product, at a grind dependant on ore type. The spiral concentrate would then be reground and recombined with the spiral tail for thickening and CIL gold recovery to improve cyanide amenability of the ultrafine locked component. The metallurgical circuit comprised the following components:-

       crushing

       milling with gravity recovery;
 
       spiral concentrators;
 
       spiral concentrate re=grind;
 
       CIL on spiral concentrate and tailings; and
 
       elution and electrowinning.
 
12.2. Metallurgical Testwork Programme Phase V
NI 43-101 Item 13 (a)
Subsequent to the 2011 PFS, a fifth phase testwork programme was designed to quantify the metallurgical recovery that could be achieved through the combination of:-

       gravity recovery within the milling circuit;

       flotation recovery on the gravity tailings and
 
       a leach on the flotation concentrates.
 
The selection of the optimum grind size for the primary grind is crucial to any gold process flow sheet as it sets the first limitation with regards to gold recovery thereafter. During Phase III a grind optimisation trade off study (Table 10), suggested that a target grind of 80% passing (P80) 150mm, was adequate for the circuit which was revised to P80 = 106 µm during phase IV. All subsequent testwork for Phase V was performed at P80 = 75µm as the evidence supported the benefit of a finer target grind size.

Amdel Metallurgical Laboratories (Amdel) in Perth was commissioned to complete the Phase V testwork, based on remaining core from the previous Phase III and IV test work campaigns. In Phase V the
following ore types were defined:-

       laterite;

       oxide;
 
       transitional; and
 
       fresh.
 
The 2013 PFS testwork utilised remnants of the initial testwork core samples to reinvestigate the option of gravity/float/CIL processing and to address the issue of grind size in more detail
 
Graphic
 
 

 
 
June 2011
52

12.2.1. 2013 Testwork Scope for Phase V
NI 43-101 Item 13 (a)
The Phase V testwork scope was designed with the objective of completing all metallurgical testwork required to verify the flotation recovery and process design parameters in order to finalise the process flow sheet, size mechanical equipment and determine plant capital and operating costs. The programme included the following:-

     flotation testwork to evaluate plant recovery on oxide, transition and fresh material;

     comminution testwork on oxide, transition and fresh material- grindmill tests;
 
     gravity recovery testwork and leaching of gravity concentrates on oxide, transition and fresh material;

     CIL test work on flotation concentrates at fine grind on fresh material;

     whole-ore CIL test work on gravity tailings on oxide, transition and fresh material;

     evaluation of flotation and CIL reagent consumptions; and
 
     continuous cyanide destruction and arsenic removal test work.
12.2.2. Comminution Testwork Results Phase V
NI 43-101 Item 13 (a)
A comminution tests using Sag Mill Comminution test (SMC), Abrasion Index and Bond Ball Work Index (BBWi) characterised breakage function for three ore composites namely; fresh, transition and oxide material was conducted by Lycopodium in Phase IV. Previous specific rates of breakage had been benchmarked with similar deposits but grindability testwork in 2012-2013 was conducted at Amdel, using new grind mill apparatus, to obtain specific peak rates of breakage trends for three composited samples.

Normally a 12% order of magnitude spread for breakage rates is typical for BBWi tests, but the Esaase testwork variation 23% averaged 11.6±2.6kWh/t. (11.8kWh/t "S-curve" averaged) indicating a high degree of hardness variation. Population balance modelling was used to conduct simulations with the aim of establishing the performance at a full-scale plant size in order to achieve a target mesh of grind of 80% minus 75µm, as determined from evaluation of the Phase I - IV testwork. Based on this modelling, the net specific energy requirement was determined to be 16kWh/t when treating fresh material and 13.8kWh/t when treating oxide material.

12.2.3. Gravity Recovery Results Phase V
NI 43-101 Item 13 (a)
Gravity recovery testwork for each material type followed by flotation testing conducted on the gravity tailings. A summary of the gravity recovery results for each ore type and composite samples representative of run-of-mine (RoM) material are presented in Table 13. Composite samples A40, A100 and B40 were most representative of the mine blend.

12.2.4. Batch Flotation Results - 2013
NI 43-101 Item 13 (a)
Flotation tests were carried out on each of the different material types and process engineers from DRA were present to witness the flotation tests. The initial reagent suite used for the flotation tests was based on the conclusions drawn from the Phase IV test work. The results of the testwork are summarised in Table 14.
 
Graphic
 
 

 
 
June 2011
53

Table 13 : Gravity Concentration Results on Composite Samples
 
 
COMPOSITE

CALCULATED
HEAD GRADE
(g/t)
COMBINED
TAILINGS ASSAY
(g/t)
Au
RECOVERY
(%)
AVERAGE GOLD
RECOVERY
(%)
Laterite
0.69
0.58
13.4 - 19.7
16.54
Oxide
1.51
1.01
26.7 - 38.3
32.8
Transition
1.51
0.81
27.3-52.7
46.1
Fresh
2.09
1.26
31.2- 48.3
39.9
A40
1.54
1.05
31.90
 
A100
1.05
0.93
11.80
B40
1.92
1.65
14.20
C40
1.56
0.95
39.20
Source : DRA 2013

12.2.5. Bulk Flotation Results - 2013
NI 43-101 Item 13 (a)
Bulk flotation test were carried out on each of the different material types, as well as composite samples representing RoM mine blends. The results of the testwork are summarised in Table 15.

The oxide material bulk flotation tests had higher residue grades and lower flotation recovery than the batch flotation tests at a reduced mass pull of 5%. The transition material bulk flotation tests had a residue grade and recovery similar to that obtained in the batch flotation testing at a lower mass pull of 8.8%. The fresh material bulk flotation tests had poor accountability but produced a residue grade similar to that achieved in the fresh batch flotation tests.

The composite RoM bulk flotation tests had poor accountability and two of the four composites were excluded. A single test result indicated that a flotation recovery of 84.4% could be achieved; however the overall recovery for this test was lower than expected due to a low gravity recovery of only 11.8%.

12.2.6. Flotation Concentrate Leach Test Results
NI 43-101 Item 13 (a)
Carbon in Leach (CIL) tests were conducted on the fresh ore flotation concentrates at the "as floated" grind of 45µm and a target grind of 25mm. The fresh ore flotation concentrate was the only ore type tested as this would be regarded as the "worst" case leach conditions. The results of the series of tests at various conditions are presented in Table 16.

The inclusion of pre-oxidation in the tests with "diesel and carbon added at the start of the leach" ( Tests 1 and 2 in Table 16) did not indicate any recovery improvement as the residue grades are very similar, namely 0.46g/t and 0.47g/t respectively.

The lowest gold extraction was achieved for Test 4 in which no carbon was added. In Test 3 in which carbon was only added after 4 hours indicated a gold extraction of 84.7% which was significantly lower than the 92.0% - 94.7% extraction achieved for the tests in which carbon was added at the start of the leach.

The CIL test conducted with carbon at t=0 and 100g/t diesel but at a target grind of 80% passing 25mm (Test 6 Table 16), indicated that a residue grade of 0.15g/t could be achieved with an equivalent gold recovery of 96.6%. This indicated a recovery benefit of 3.4% as compared to the "as floated" concentrate grind at 80% passing 45mm.

For the purpose of estimating plant recovery a CIL tails residue grade of 0.15g/t was used, this is the residue achieved at a concentrate grind of 80% passing 25mm in Test 6, for this reason the current flow sheet includes a regrind Vertimill.

Cyanide consumptions in Table 16 will not be indicative of actual plant requirements and in order to provide an estimate of plant operating costs, a cyanide consumption of 8kg/t was used as the estimated consumption after 16 hours of leaching.
 
Graphic
 
 

 
 
June 2011
54

Table 14 : Batch Flotation Results on Gravity Tailings
 
 
FEED MATERIAL
 
 

GRAVITY FEED
FLOTATION FEED
OVERALL
RECOVERY
(%)
FLOTATION
MASS PULL
(%)
GRADE
ASSAY
 
(g/t)
CALCULATED
GRADE
 
(g/t)
RECOVERY
 
(%)

GRADE
TAILINGS
 
(g/t)
CALCULATED
GRADE
 
(g/t)
GRADE
TAILINGS
 
(g/t)
RECOVERY
 
(%)

     
     
Oxide
1.57
1.40
27.80
1.01
0.55 - 1.14
0.18 - 0.25 75.70 - 79.60
83.70 - 86.70
10.20
- 12.90
Transition
1.06
1.40
41.80
0.81
0.78 - 0.92
0.10 - 0.16 82.00 - 89.00
90.20 - 93.60
10.10
- 17.20
Fresh
1.89
1.84
31.60
1.26
1.04 - 1.29
0.05 - 0.12
91.80 - 96.00
94.40 - 97.50
8.80
- 13.70
Source : DRA 2013

Table 15 : Bulk Flotation Results on Gravity Tailings
 
 
FEED MATERIAL
 
 

GRAVITY FEED
FLOTATION FEED
OVERALL
RECOVERY
(%)
FLOTATION
MASS PULL
(%)
CALCULATED
GRADE
 
(g/t)
RECOVERY
 
(%)

GRADE
TAILINGS
 
(g/t)
CALCULATED
GRADE
 
(g/t)
GRADE
TAILINGS
 
(g/t)
RECOVERY
 
(%)

   
   
Oxide
1.68
38.3
1.04
0.99 - 1.04
0.36 - 0.37
64.50 - 67.30 79.10 - 79.70
5.10 - 5.40
Transition
1.5
52.7
0.71
0.71
0.16
79.40
90.30
8.80
Fresh
1.26
48.3
0.65
1.37
0.15
90.00
89.10
8.80
RoM Composite
1.05 - 1.56
11.80 - 39.20
0.93 - 0.95
0.84 - 0.89
0.14 - 0.18
81.40 - 84.40
87.50 - 89.30
6.50 - 7.80
Source : DRA 2013

Table 16 : Fresh Material Concentrate Leach Test Summary
 
 
TEST CONDITIONS
RESULTS
Table
16TEST
HIGH SHEAR
PREOXIDATION
(hrs)
CIL
LEACH
(hrs)
CARBON
(g/L)
CARBON ADDED
@ hrs
LEAD NITRATE
(g/t)
DIESEL
(g/t)
80% PASSING (µm)
CIL
CALCULATED
HEAD GRADE
( Au g/t)
RESIDUE
Au
GRADE
(g/t)
CIL
EXTRACTION
(%)

NaCN
(kg/t)

LIME
(kg/t)

1
0
24
20
t=0hrs
50
100
45
6.72
0.46
93.15
12.85
0.44
2
4
24
20
t=0hrs
50
0
45
5.86
0.47
91.98
9.58
3.37
3
4
24
20
t=4hrs
50
0
45
5.22
0.8
84.68
11.72
5.79
4
4
24
0
none
50
0
45
5.32
1.18
77.8
8.39
4.19
5
4
24
20
t=0hrs
50
100
45
6.36
0.34
94.65
13.67
5.94
6
4
24
20
t=0hrs
50
100
25
4.35
0.14
96.55
15.7
5.88
Source : DRA 2013
 
Graphic
 
 

 
 
June 2011
55

Further testing is required in order to improve definition of the expected recovery, reagent consumption and design parameters for the concentrate CIL circuit. The following needs to be
addressed in the next phase of testing:

     confirmation of CIL recovery at a target grinds of 80% passing 25mm, which the inclusion of gravity concentration on the flotation concentrate;

     cyanide optimisation as the current phase of testing indicated excess cyanide addition; and

     determination of the expected lime consumption as Phase V pH control was not optimised and this resulted in excessive lime consumption.
 
12.2.7. Whole-ore Leach Test Results
NI 43-101 Item 13 (a)
The whole-ore tests were aimed at determining the expected CIL recovery for each material type at a grind of 80% passing 75mm, to assess the benefits of high shear pre-oxidation on recovery and establish if preg-robbing was present as indicated in the Phase III testing. These tests were specifically aimed at comparing the overall gravity-CIL recovery to that obtained for the gravity-flotation-CIL tests. The test conditions were evaluated for a 24 hour residence time at 40% solids and a target leach pH of 10.0 - 10.5 for all tests. Tests 1- 4 were conducted without high shear pre-oxidation and tests 5- 8 were conducted with the inclusion of high shear pre-oxidation. The results for the three material type are presented in Table 17.

12.2.7.1. Oxide Material Whole-ore Leach
NI 43-101 Item 13 (a)
The oxide material CIL test results are presented in Table 17. The test results for the pre-oxidised material, Tests 5 to 8 in Table 17, showed that without carbon (Test 7) the CIL residue grade was 0.106g/t with a CIL gold recovery of 85.6%.

The oxide ore CIL tests with high shear pre-oxidation showed no increase in gold recovery, but more than doubled the sodium cyanide and lime consumption. The overall combined gravity and CIL recovery for the oxide material ranges 79.8% - 92.6%.

12.2.7.2. Transition Material Whole-ore Leach
NI 43-101 Item 13 (a)
The test results for the transition material are presented in Table 18 and overall recovery for combined gravity and CIL for the transition material was found to be in the range 86.2% - 93.0%. The CIL tests conducted with high shear pre- oxidation indicated no improved overall recovery at the expense of increased reagent consumption. The leach tests conducted with no carbon addition had the highest residue grades and lowest recovery, this is an indication of preg-robbing caused by the presence of carbonaceous or shale material. This was further indicated by the leach tests with carbon addition after 4hr having higher residue grades than the CIL tests with carbon addition at the start of the leach. This effect was noticed irrespective of diesel addition.

12.2.7.3. Fresh Material Whole-ore Leach
NI 43-101 Item 13 (a)
The test results for the fresh material are presented in Table 19 and the overall recovery for combined gravity and CIL ranges 82.1% - 90.0%. The CIL tests conducted with high shear pre-oxidation indicated no improved overall recovery at the expense of increased reagent consumption. The leach tests conducted with no carbon addition had the highest residue grades and lowest recovery, this is an indication of preg-robbing caused by the presence of carbonaceous or shale material. This was further indicated by the leach tests with carbon addition after 4h having higher residue grades that the CIL tests with carbon addition at the start of the leach. This effect was noted irrespective of diesel addition.
 
Graphic
 
 

 
 
June 2011
56

Table 17 : Oxide Material Whole-ore CIL Leach Test Summary Results
 
TEST CONDITIONS
 
RESULTS
TEST
HIGH SHEAR
PREOXIDATION
(hrs)
CIL
LEACH
(hrs)
CARBON
(g/L)
CARBON ADDED
@ hrs
LEAD NITRATE
(g/t)
DIESEL
(g/t)
80% PASSING (µm)
GRAVITY
TAILINGS
(g/t)
CIL
CALCULATED
HEAD GRADE
( Au g/t)
CIL
RESIDUE
Au
GRADE
(g/t)
CIL
RECOVERY
(%)

TOTAL
RECOVERY (%)
NaCN
(kg/t)

LIME
(kg/t)

1
no
24
20
t=0hrs
50
50
75
1.01
0.77
0.118
84.75
91.57
1.41
0.28
2
no
24
20
t=4hrs
50
50
75
1.01
0.80
0.104
86.95
92.57
1.45
0.30
3
no
24
none
none
50
50
75
1.01
0.87
0.143
83.51
89.78
1.27
0.32
4
no
24
20
t=0hrs
50
100
75
1.01
0.97
0.283
70.85
79.77
1.36
0.29
5
4
24
20
t=0hrs
50
50
75
0.89
0.85
0.190
77.75
84.61
2.46
1.24
6
8
20
20
t=4hrs
50
50
75
0.89
0.77
0.134
82.55
89.14
2.76
1.08
7
4
24
none
none
50
50
75
0.89
0.73
0.106
85.56
91.41
2.14
1.22
8
4
24
20
t=0hrs
50
100
75
0.89
0.75
0.097
87.05
92.14
2.54
1.26
Source : DRA 2013

Table 18 : Transition Material Whole-ore CIL Leach Test Summary Results
 
 
TEST CONDITIONS
   
RESULTS
TEST
HIGH SHEAR
PREOXIDATION
(hrs)
CIL
LEACH
(hrs)
CARBON
(g/L)
CARBON ADDED
@ hrs
LEAD NITRATE
(g/t)
DIESEL
(g/t)
80% PASSING (µm)
GRAVITY
FEED
GRADE
(g/t)
GRAVITY
TAILINGS
(g/t)
CIL
CALCULATED
HEAD GRADE
( Au g/t)
CIL
RESIDUE
Au
GRADE
(g/t)
CIL
RECOVERY
(%)

TOTAL
RECOVERY (%)
NaCN
(kg/t)

LIME
(kg/t)

1
no
24
20
t=0hrs
50
50
75
1.40
0.81
0.95
0.098
89.67
92.98
1.60
0.23
2
no
24
20
t=4hrs
50
50
75
1.40
0.81
0.83
0.173
79.23
87.61
1.81
0.21
3
no
24
none
none
50
50
75
1.40
0.81
0.87
0.522
40.00
62.61
1.46
0.19
4
no
24
20
t=0hrs
50
100
75
1.40
0.81
0.84
0.127
84.95
90.90
1.84
0.15
5
4
24
20
t=0hrs
50
50
75
1.10
0.64
0.61
0.086
85.88
92.21
2.60
0.62
6
8
20
20
t=4hrs
50
50
75
1.10
0.64
0.65
0.015
76.42
86.05
3.03
1.27
7
4
24
none
none
50
50
75
1.10
0.64
0.56
0.280
49.73
74.63
2.22
0.68
8
4
24
20
t=0hrs
50
100
75
1.10
0.64
0.62
0.090
85.55
91.85
2.58
0.67
Source : DRA 2013
 
Graphic
 
 

 
 
June 2011
57

Table 19 : Fresh Material Whole-ore CIL Leach Test Summary Results
     
TEST CONDITIONS
           
RESULTS
     
                     
CIL
       
TEST
HIGH SHEAR
CIL
 
CARBON
LEAD
 
80%
GRAVITY
GRAVITY
CIL
RESIDUE
CIL
TOTAL
   
 
PREOXIDATION
LEACH
CARBON
ADDED
NITRATE
DIESEL
PASSING
FEED
TAILINGS
CALCULATED
Au
RECOVER
RECOVERY
NaCN
LIME
     
(g/L)
   
(g/t)
 
GRADE
 
HEAD GRADE
     
(kg/t)
(kg/t)
 
(hrs)
(hrs)
 
@ hrs
(g/t)
 
(µm)
 
(g/t)
 
GRADE
Y (%)
(%)
   
               
(g/t)
 
( Au g/t)
(g/t)
       
1
no
24
20
t=0hrs
50
50
75
1.84
1.26
1.11
0.111
89.970
93.97
1.36
0.12
2
no
24
20
t=4hrs
50
50
75
1.84
1.26
1.13
0.184
83.760
90.00
1.44
0.19
3
no
24
none
none
50
50
75
1.84
1.26
1.09
0.659
39.650
64.19
1.44
0.19
4
no
24
20
t=0hrs
50
100
75
1.84
1.26
0.97
0.117
87.960
93.64
1.48
0.14
5
4
24
20
t=0hrs
50
50
75
1.17
0.8
0.79
0.118
85.100
89.88
2.58
0.82
6
8
20
20
t=4hrs
50
50
75
1.17
0.8
0.70
0.353
49.210
69.72
2.61
0.81
7
4
24
none
none
50
50
75
1.17
0.8
0.58
0.282
51.560
75.81
2.39
0.60
8
4
24
20
t=0hrs
50
100
75
1.17
0.8
0.72
0.128
82.120
89.02
2.44
0.88
Source : DRA 2013
 
Graphic
 
 

 
 
June 2011
58

12.3. Process Plant Recovery Estimate
NI 43-101 Item 13 (b)
The plant recovery estimate for Esaase Project aims to provide an estimate of recovery for full scale operations in two combinations namely:-

       gravity recovery within the milling circuit; flotation on the gravity circuit tailings; and a CIL leach on the flotation concentrate (Flotation Included);

       as compared to a conventional combination of gravity recovery within the milling circuit and conventional CIL on the gravity tailings without flotation (Flotation Excluded).
 
The recovery estimate for the gravity-flotation-CIL (Flotation Included) process has been based on the flotation tails and CIL tails residue grades that were achieved in the Phase V test work campaign conducted at Amdel. The recovery estimates for a conventional gravity-CIL (Flotation Excluded) process has been based on the CIL residue grades that were achieved in the Phase III and V test work campaigns at Amdel. The phase IV test work results were not used because this testing was conducted on a CIL circuit that included enhanced gravity recovery and leaching of gravity concentrates and tailings. This would be equivalent to tests in which the flotation tailings stream was also leached and for this reason, the recovery and reagent consumption achieved is not considered representative of that for a conventional CIL circuit with conventional gravity concentration in the milling circuit.

In order to provide an estimate of the expected recovery for full scale continuous plant operations, the bench scale laboratory recoveries must be discounted in order to account for process inefficiency and
solution gold losses due to:-

       CIL carbon fines losses to tailings;
       CIL solution gold losses;
       scale-up of bench scale flotation to plant scale; and
       scale-up of bench scale CIL to plant scale.
 
The resultant recovery estimates are summarised in Table 20, for both Flotation Included and Flotation Excluded process flows, together with the applicable estimation criteria and the appropriate discount factors:-
 
Table 20 : Estimated LoM Plant Recoveries for Flotation Included and Flotation Excluded Process Flows
 
 
FLOTATION INCLUDED PROCESS
FLOTATION EXCLUDED PROCESS
RoM MATERIAL
FLOTATION RESIDUE
RECOVERY
CIL RESIDUE GRADE
RECOVERY at
RECOVERY at 75µm
 
GRADE (g/t)
(%)
(g/t)
150µm (%)
(%)
Laterite
estimated same as oxide
84.54
estimated same as oxide
84.80
92.80
Oxide
0.21
84.67
0.143
84.80
92.90
Transition
0.14
91.20
0.100
84.90
93.70
Fresh
0.074
94.23
0.119
88.40
91.50
Recovery discount
 
1.11
 
1.63
1.65
LoM
 
90.06
 
85.30
90.55
Estimation Criteria
Mass Pull 9%
         
Regrind to get 80% passing 20µm
 
80% Passing 150µm and 75µm
 
Target CIL residue grade for all material types 0.15(g/t Au)
     
Discount Factors
CIL concentrate carbon fines losses @10g/t @ 50g/t Au
 
CIL concentrate carbon fines losses @10g/t @ 50g/t Au
Solution gold losses based on 42% solids in CIL tailings and 0.01g/L Au
Solution gold losses based on 42% solids in CIL tailings and 0.01g/L Au in
in solution
   
solution
   
Scale-up factor of 0.85% after commissioning and optimisation
Scale-up factor of 0.85% after commissioning and optimisation
Source : DRA 2013
 
Graphic
 
 

 
 
June 2011
59

12.4. Conclusions for Mineral Processing and Metallurgical Testwork
NI 43-101 Item 13 (c), (d)
The combined historical and current metallurgical testwork results have been summarised and used to estimate LoM recoveries for two process flows, namely a combined gravity-flotation-CIL process and a conventional gravity-CIL circuit.

The Flotation Excluded gravity-CIL process increases plant capital and operating cost (see Section 20) as a result of the larger tonnages that need to be treated in the CIL and cyanide destruction circuits. Furthermore, the large CIL circuit has increased capital cost and environmental risk associated with the TSF facility.

The final process recommended by DRA comprises run-of-mine ball milling (RoMB), with primary gravity recovery from the mill circuit, flotation of the milled product, with regrind and secondary gravity recovery of the float concentrate ahead of CIL gold recovery of the reground float concentrate. Such a design has the benefit that the flotation tailings comprising approximately 90% of the feed are benign and can be disposed to a clay lined TSF, whilst the CIL and downstream plants can be downsized accordingly.


13. Mineral Resource Statement
NI 43-101 Item 14
The mineral resource estimates were compiled by Minxcon (2012) in compliance with the definitions and guidelines for the reporting of exploration information, mineral resources and mineral reserves in Canada, "the CIM Standards on Mineral Resources and Reserves - Definitions and Guidelines" and in accordance with the Rules and Policies of the National Instrument 43-101 Standards of Disclosure for Mineral Projects, Form 43- 101F1 and Companion Policy 43-101CP.

The de-surveyed drillhole data was composited within DatamineTM on a 1m composite length. A total of 233,503 composites were used in the statistical analysis and resource estimation. Forty-six mineralised domains (reefs), including the waste, form part of the statistical analysis and resource estimation. Minxcon is satisfied that the Mineral Resource estimation globally reflects the deposit based on the available data. Suitably experienced and qualified geologists, surveyors and other mineral resource practitioners employed by Asanko Gold were responsible for the capture of the drillhole information and geological information.

13.1. Assumptions. Parameters and Estimation Methodology
NI 43-101 Item 14 (a)
Grade estimation was undertaken using Ordinary Kriging and the estimation approach was considered appropriate based on review of a number of factors, including the quantity and spacing of available data, the interpreted controls on mineralisation, and the style and geometry of mineralisation (Minxcon 2012) Higher grade veins occur within a lower grade background and the individual mineralisation boundaries of these high grade veins can be difficult to define. Indicator Kriging was therefore chosen to delineate the areas with continuous grades and was used later as a start model to adequately define the mineralisation.

Based on grade information and geological logging and observations, oxidation, transition and fresh zones, mineralised domain boundaries have been interpreted and formulated into wireframes to permit the resource estimation for the Esaase Project. The interpretation and wireframe models were developed using DatamineTM geological modelling software package. Minxcon determined that a 5mx5mx3m block size provided the best results for delineating the mineralised zones using the Indicator Kriging methodology and a 10mx10mx3m block size provided the best results for geo-statistical estimation and hence the estimation was conducted on a 10mx10mx3m (X, Y & Z respectively) block model size.

13.2. Geological and Mineralisation Domains
For the purpose of the mineral resource estimation, 11 main and 2 secondary mineralised domains were interpreted and were modelled on an approximate lower cut-off grade of 0.3 g/t Au. The main mineralised domains are located within the previously broadly delineated mineralised zones, whereas the secondary mineralised domains are located outside these main mineralised zones. The waste zone was assigned a default value of 0.005 g/t gold. The main domains are depicted in Figure 8.
 
Graphic
 
 

 
 
June 2011
60
 
To delineate the mineralisation inside the previously defined wireframes, Indicator Kriging was implemented using a gold cut-off grade of 0.3g/t Au. Samples with gold grades below 0.3g/t were assigned the Kriging Indicator of 0 (AUIND = 0) and samples with gold grades above 0.3g/t Au were assigned the Kriging Indicator of 1 (AUIND = 1). A probability of 0.3 was selected as the best representative to delineate the mineralisation.


13.3. Treatment of the Alteration Zones
Sample composites were coded according to the weathering profile which was modelled from drillhole data and comprises strongly weathered saprolite, moderately weathered saprolite, transition material and fresh units. In general, the weathering surfaces broadly parallel the topographical profile, although weathering tends to be deeper within zones of mineralisation, and tends to parallel the footwall to the mineralisation approaching the surface. In some sections, the intermixing of the weathering types can be quite complicated. An example cross-section showing the distribution of weathering types and the interpreted position of the top of fresh rock is presented in Figure 8.

13.4. Statistical Analysis of the Raw Data
Classical statistics of each of the he individual reefs was undertaken in order to establish the extent of the homogeneity within the reef, the global mean and outlier analysis. The classical statistical analysis results are presented in Table 21.
 
Table 21 : Classical Statistical Analysis per Reef
 
   
GRADE
     
COEFFICIENT
         
STANDARD
 
REEF
     
VARIANCE
 
OF
         
DEVIATION
VARIATION
 
Min (g/t Au)
Min (g/t Au)
Min (g/t Au)
     
LR1
0.001
20
1.110
3.708
1.926
1.735
LR2
0.001
40
1.157
11.194
3.346
2.891
LR3
0.001
10
1.109
4.729
2.175
1.961
LR4
0.001
20
1.023
6.027
2.455
2.399
LR5
0.001
3
0.568
0.387
0.622
1.095
LR6
0.005
2
0.490
0.288
0.537
1.095
LR7
0.001
1.5
0.450
0.201
0.449
0.998
LR20
0.001
20
1.204
8.169
2.858
2.374
LR30
0.001
5
0.774
1.610
1.269
1.639
LR40
0.001
1
0.503
0.153
0.391
0.777
LRB
0.040
3
0.936
0.490
0.700
0.748
OR1
0.001
80
1.452
20.951
4.577
3.152
OR2
0.005
30
1.008
5.950
2.439
2.420
OR3
0.005
40
1.680
17.496
4.183
2.490
OR4
0.005
30
1.097
5.593
2.365
2.156
OR5
0.001
10
0.797
1.652
1.285
1.612
OR6
0.001
25
1.378
9.891
3.145
2.282
OR7
0.026
2
0.469
0.230
0.480
1.021
OR20
0.001
40
1.153
9.252
3.042
2.639
OR30
0.005
12
1.475
6.827
2.613
1.771
OR40
0.010
15
1.190
5.929
2.435
2.046
ORB
0.020
1
0.477
0.118
0.343
0.719
TR1
0.001
80
1.680
31.967
5.654
3.366
TR2
0.001
30
1.116
5.243
2.290
2.052
TR3
0.005
69
2.002
41.453
6.438
3.216
TR4
0.005
42
0.851
7.310
2.704
3.176
TR5
0.010
32
1.020
8.518
2.919
2.861
TR6
0.005
112
4.172
322.942
17.971
4.307
TR7
0.020
1
0.271
0.075
0.273
1.008
TR20
0.005
40
1.189
8.383
2.895
2.434
TR30
0.005
37
1.350
15.481
3.935
2.915
TR40
0.005
15
1.493
9.856
3.139
2.103
TRB
0.110
3
1.092
1.166
1.080
0.989
FR1
0.001
80
1.263
12.459
3.530
2.795
FR2
0.002
50
1.055
7.677
2.771
2.626
FR3
0.005
60
1.225
11.320
3.364
2.746
FR4
0.002
30
0.959
5.462
2.337
2.438
Source : Minxcon 2012
 
Graphic
 
 

 
 
June 2011
61

Outlier analysis was undertaken using histograms and probability plots and was determined for both the variography and the kriging stages. For variography the outliers were cut at a specified value, but for kriging the outliers are capped at a specified value. Hence, all available data is used in the kriging of the data, but a restricted data set is used for variography. The histograms and probability plots indicate that the populations of gold grades are close to log normal, which is typical of many gold deposits. The coefficients of variation are moderately high but typical for these types of deposits. The kriging capping and the variogram top-cut values applied to the data are summarised in Table 22.

Table 22 : Variogram Top-cut and Kriging capping per Reef
 
  VARIOGRAM TOP-CUT VALUES KRIGING CAPPING VALUES
 
Top Cut
 
Top Cut
 
Top Cut
 
Top Cut
Reef
(g/t Au)
Reef
(g/t Au)
Reef
(g/t Au)
Reef
(g/t Au)
FR1
80
OR20
40
FR1
60
OR20
20
FR2
50
OR3
40
FR2
30
OR3
20
FR20
50
OR30
12
FR20
30
OR30
10
FR3
60
OR4
30
FR3
40
OR4
20
FR30
20
OR40
15
FR30
15
OR40
5
FR4
30
OR5
10
FR4
20
OR5
6
FR40
20
OR6
25
FR40
10
OR6
10
FR5
15
OR7
2
FR5
10
OR7
1
FR6
12
ORB
1
FR6
8
ORB
1
FR7
15
TR1
80
FR7
10
TR1
60
FRB
4
TR2
30
FRB
3
TR2
20
LR1
20
TR20
15
LR1
15
TR20
10
LR2
40
TR3
40
LR2
20
TR3
20
LR20
20
TR30
20
LR20
15
TR30
15
LR3
10
TR4
20
LR3
4
TR4
10
LR30
5
TR40
10
LR30
3
TR40
4
LR4
20
TR5
15
LR4
10
TR5
5
LR40
1
TR6
20
LR40
1
TR6
10
LR5
3
TR7
1
LR5
2
TR7
1
LR6
2
TRB
3
LR6
2
TRB
3
LR7
2
W
60
LR7
1
W
40
LRB
3
WE
60
LRB
3
WE
40
OR1
80
-
-
OR1
60
-
-
OR2
30
-
-
OR2
15
-
-
Source : Minxcon 2012
 
13.5. Variography
Downhole variograms were constructed to permit the determination of the nugget value, as well as the vertical or across deposit search range for the kriging estimation. In general, it was established that the average vertical range for the domains and grade was 9m. Point experimental variograms were generated and modelled for each domain. The parameters of the modelled variograms for the Asanko Esaase Project are summarised in Table 12.

13.6. Estimation Methodology
Both simple and ordinary kriging estimation methodologies were undertaken. Simple kriging includes the global mean grade as a constituent of the kriging equation and was used primarily in areas which are not well informed by data. The mean grade of the population was included as part of the estimate and for this exercise ordinary kriging was used.

Table 23 : Variogram Parameters per Reef
 
     
NUGGET
SILL
RANGE 1
RANGE
RANGE
SILL
RANGE
RANGE
RANGE
REEF
PARAMETER
SILL
(%)
(1%)
(m)
2 (m)
3 (m)
( 2%)
1 (m)
2 (m)
3 (m)
LR1
AU
2.18
40.5
87.12
38.97
64.95
9
100
50.08
67.78
9
LR2
AU
2.71
34.38
85.88
37.5
62.5
9
100
38.54
64.37
9
LR3
AU
0.47
30.32
76.88
31.47
42.88
9
100
69.61
75
9
LR4
AU
2.67
31.74
55
38.81
46.94
9
100
63.1
92.17
9
LR5
AU
2.6
32.76
55
53.58
71.46
9
100
75
78.28
9
LR6
AU
1.72
37.95
55
38.95
111.44
9
100
84.64
95.53
9
LR7
AU
0.04
32.75
55
13.21
13.21
9
100
9.15
9.15
9
LR20
AU
1.94
37.23
87.83
62.22
65.19
9
100
101.86
143.56
9
 
Graphic
 
 

 
 
June 2011
62
 
 
     
NUGGET
SILL
RANGE 1
RANGE
RANGE
SILL
RANGE
RANGE
RANGE
REEF
PARAMETER
SILL
(%)
(1%)
(m)
2 (m)
3 (m)
( 2%)
1 (m)
2 (m)
3 (m)
LR30
AU
0.46
31.79
86.02
38.82
187.96
9
100
77.64
139.49
9
LR40
AU
0.06
31.26
99.9
36.06
36.06
9
100
43.05
43.05
9
LRB
AU
0.91
44.66
76.96
28.12
65.27
9
100
70.28
83.55
9
OR1
AU
2.22
40.07
79.17
56.76
68.05
9
100
29.01
77.22
9
OR2
AU
1.78
49.5
87.01
38.98
55.41
9
100
41.25
49.51
9
OR3
AU
1.81
44.58
85.65
23.94
47.78
9
100
39.54
49.25
9
OR4
AU
1.82
35.89
81.58
38.97
55.51
9
100
20.73
91.76
9
OR5
AU
1.82
39.67
55
31.13
52.41
9
100
67.77
83.73
9
OR6
AU
2.38
30.27
55
69.62
73.15
9
100
94.03
69.04
9
OR7
AU
0.08
32.73
76.56
26.99
36.99
9
100
41.48
45.1
9
OR20
AU
2.16
38.14
55
39.96
47.06
9
100
30.88
58.69
9
OR30
AU
4.24
32.45
76.88
85.1
93.27
9
100
81.92
107.57
9
OR40
AU
1.97
45.05
55
62.53
62.53
9
100
87.68
87.68
9
ORB
AU
1.55
61.67
89.54
5.6
5.6
9
100
6.4
6.4
9
TR1
AU
2.14
39.97
89.26
38.99
64.99
9
100
52.47
129.98
9
TR2
AU
2.17
37.29
76.84
47.6
43.13
9
100
32.08
79.36
9
TR3
AU
1.99
50.79
76.14
50.12
83.53
9
100
63.42
98.29
9
TR4
AU
1.45
61.67
93.88
45
51.36
9
100
90
150
9
TR5
AU
1.6
48.16
84.38
95.12
124.81
9
100
200.13
84.98
9
TR6
AU
2.72
59.23
59.82
29.53
48.65
9
100
97.21
162.01
9
TR7
AU
1.43
43.74
55
6.49
10.81
9
100
12.97
15.91
9
TR20
AU
1.92
45.86
90.81
42.76
84.55
9
100
17.96
63.3
9
TR30
AU
2.87
30.79
55
76.94
131.79
9
100
105.85
145.87
9
TR40
AU
1.85
45.71
55
77.01
101.3
9
100
154.02
193.97
9
TRB
AU
0.42
56.33
87.04
360.62
360.62
9
100
295.36
295.36
9
FR1
AU
2.22
45.8
85.94
54.87
9.49
9
100
159.44
130.5
9
FR2
AU
2.22
40.91
74.91
71.03
64.96
9
100
89.32
53.33
9
FR3
AU
6.17
32.86
80.5
59.43
31.85
9
100
86.5
76.89
9
FR4
AU
1.98
46.12
55
39.07
39.27
9
100
63.22
83.62
9
FR5
AU
1.8
31.13
75.59
59.33
64.93
9
100
126.8
129.88
9
FR6
AU
2.59
34.36
91.89
26.19
42.2
9
100
34.19
29.43
9
FR7
AU
2.29
38.94
75.92
29.58
37.66
9
100
25.13
69.79
9
FR20
AU
2.49
34.43
75.4
53.17
27.52
9
100
90.32
21.92
9
FR30
AU
3.19
49.15
55
42.19
66.03
9
100
61.03
79.27
9
FR40
AU
2.56
39.02
84.88
77
52.54
9
100
61.47
77.7
9
FRB
AU
1.83
30.75
75.25
51.35
52.82
9
100
131.75
126.16
9
W
AU
2.2
43.9
97.45
78.04
126.72
9
100
107.54
125.24
9
WE
AU
2.61
36.89
55
162.5
162.5
9
100
250.74
250.74
9
Source : Minxcon 2012

The global means for each domain and reef were determined through the analysis of the statistics of various regularised data set dimensions. Minxcon de-clustered the data and reviewed the means and average variances of each de-clustered data set in order to determine the most representative global mean for each domain as summarised in Table 24. The de-clustered block size used for the de- clustering was 80mx80mx250m.
 
Table 24 : Global Mean Gold Grade per Reef
 
 
GLOBAL
 
GLOBAL
REEF
MEAN
REEF
MEAN
 
(g/t Au)
 
(g/t Au)
FR1
1.26
OR2
1.01
FR2
1.06
OR20
1.15
FR20
1.44
OR3
1.68
FR3
1.23
OR30
1.48
FR30
1.25
OR4
1.10
FR4
0.96
OR40
1.19
FR40
1.10
OR5
0.80
FR5
0.82
OR6
1.38
FR6
1.22
OR7
0.47
FR7
0.94
ORB
0.48
FRB
0.76
TR1
1.68
LR1
1.11
TR2
1.12
LR2
1.16
TR20
1.19
LR20
1.20
TR3
2.00
LR3
1.11
TR30
1.35
LR30
0.77
TR4
0.85
LR4
1.02
TR40
1.49
LR40
0.50
TR5
1.02
LR5
0.57
TR6
4.17
Graphic
 
 

 
 
June 2011
63

 
GLOBAL
 
GLOBAL
REEF
MEAN
REEF
MEAN
 
(g/t Au)
 
(g/t Au)
LR6
0.49
TR7
0.27
LR7
0.45
TRB
1.09
LRB
0.94
W
0.12
OR1
1.45
WE
0.68
Source : Minxcon 2012

13.7. Classification Criteria
The Mineral Resource classification is a function of the confidence of the data from drilling, sampling, and analytical programmes and their contribution to the geological understanding and geostatistical relationships. The grade estimates have been classified as Measured, Indicated and Inferred in accordance with NI 43-101 guidelines based on the confidence levels of the key criteria that were considered during the resource estimation. The key criteria included both confidence in the quality of the data and geostatistical considerations. The confidence criteria for drilling, sampling and geological data
are tabulated below:-
 
Table 25 : Confidence Levels for Key Input Data
 
DATA SOURCES
COMMENTS
LEVEL of CONFIDENCE
Drilling Techniques
RC/Diamond - Industry standard approach
High
Logging
Standard nomenclature and apparent high quality
High
Drill Sample Recovery
Diamond core and RC recovery adequate
High
Sub-sampling Techniques
 
High
and Sample Preparation
Industry standard for both RC and Diamond core
 
  Quality of Assay Data Quality control conclusions outlined in Section 14. Some issues have been identified. Recent improvements have been noted.  
Moderate
 
Verification of Sampling and
 
High
Assaying
Dedicated drill hole twinning to reproduce original drill intercepts.
 
Location of Sampling Points
Survey of all collars with adequate downhole survey. Investigation
High
 
of available downhole survey indicates expected deviation.
 
 
Core mineralisation defined on a notional 40mE x 40mN drill
 
Data Density and
spacing with a small area drilled at 20mE x 20mN. Other areas
 
Distribution
more broadly spaced to approximately 80mN spaced lines (40mE
Moderate to High
 
spacing) reflecting a lower confidence.
 
Database Integrity
Minor errors identified and rectified
High
 
The broad mineralisation constraints are subject to a large amount
 
 
of uncertainty concerning localised mineralisation trends as a
 
Geological Interpretation
reflection of geological complexity. Closer spaced drilling is
Moderate
 
required to resolve this issue.
 
   
High below top of
Rock Dry Bulk Density
DBD measurements taken from drill core, DBD applied is
transition, moderate in
 
considered robust when compared with 3D data.
oxide material
Source : Minxcon 2012
 
The geostatistical criteria used in the Mineral Resource classification are summarised below:-

Table 26 : Mineral Resource Classification Criteria
 
CLASSIFICATION CRITERIA
MEASURED
INDICATED
INFERRED
 
Measured: at least 4 drill
Indicated: at least 2 drill
 
 
holes within variogram
holes within variogram
Inferred: 1 drill hole
Number of samples used
range and a minimum of
range and a minimum of
within search range.
 
16 one meter composited
8 one meter composite
 
 
samples.
samples.
 
     
Inferred: further than
Distance to sample (variogram
Measured: at least within
Indicated: within
variogram range and
range)
60% of variogram range.
variogram range.
within geological
     
expected limits.
 
Measured: less than 20%
Indicated: 20%-40%
Inferred: more than 40%
lower confidence limit (blocks):
from mean (80%
from mean (80%-60%
(less than 60%
 
confidence).
confidence).
confidence).
 
Measured: more than
   
Kriging efficiency:
40%
Indicated: 10%-40%;
Inferred: less than 10%.
deviation from lower 90%
     
confidence limit (data distribution
Measured: less than 10%
Indicated: 10%-20%;
Inferred: more than 20%.
within Resource area considered
deviation from mean.
   
for classification):
     
Source : Minxcon 2012
 
Graphic
 
 

 

June 2011
64

Wireframe models were constructed to delineate Measured, Indicated and Inferred Resources for each domain. Minxcon used the Coffey Mining mineral resource category boundaries as a template to determine the new resource category areas. The resource areas determined by Minxcon are similar to those defined by Coffey Mining with an estimated 5% difference between the Coffey 2011 resource category boundaries and the Minxcon 2012 resource boundaries.

The resultant mineral resource classification model is presented in Figure 9, and the associated grade distribution is shown in Figure 10.

Minxcon is of the opinion that there is sufficient confidence in the estimate of the Measured and Indicated Resource areas to allow the appropriate application of technical and economic parameters and enable an evaluation of economic viability.

13.8. Mineral Resource Estimate
NI 43-101 Item 14 (b)
The Mineral Resource estimate was based on two groups of resources, namely the Main Zone which refers all the material inside the wire frames, and the Secondary Zone which refers to the economic mineralisation material outside the wire frames. A summary of the estimated NI 43-101 compliant Mineral Resources for the Esaase Project at various cut-off grades is provided in Table 27. The estimate includes all the main mineralised geological domains including satellite deposits as shown in Figure 9 and the gold grade distribution in plan and cross-section is presented in Figure 10.

Inferred Mineral Resources have a significant degree of uncertainty as to whether they can be mined economically and it cannot be assumed that all or any part of the Inferred Resource will be upgraded to a higher confidence category. In compliance with NI 43-101 Section 3.4(e) it is noted that Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. However, the Esaase Mineral Resources have undergone valid modification in this 2013 PFS and Mineral Reserves that do have demonstrated economic viability have been estimated (see Section 14).

13.9. Previous Mineral Resource Reconciliation
A comparison of the Coffey Mining 2011 and Minxcon 2012 Mineral Resource estimates is presented in Table 28.

The difference in tonnage and contained gold between the Coffey Mining 2011 and Minxcon 2012 estimates as a whole, is the result of Minxcon incorporating mineralised material outside the 2011 wireframes, which has been referred to by Minxcon as the secondary material.

The 2011 estimate was based in total on 1,187 drillholes with 213,905 samples which increased to 233,503 samples in the Minxcon 2012 estimate. In addition the changes in classification to the Measured category are a result of the classification criteria used by Minxcon which not only took cognisance of the drillhole spacing as in the 2011 estimate, but also such factors as also geological relationships, number of samples used for a block estimate, kriging efficiency, lower confidence limit, regression slope and variogram ranges which represent grade continuity. These parameters are all well within the confidence required for a Measured Mineral Resource category. Although there is a marked increase in the measured resource category, the tonnes in this category represent only 19% of the total tonnes.
The tonnage for Inferred is lower for the Minxcon 2012 estimate as some of this material was allocated to the Indicated category, due to the amount of new data acquired which improved delineation of the economic areas.

 
 

 

Graphic
 
 
 

 
Graphic
 
 
 

 
June 2011
67
 
Table 27 : NI 43-101 Mineral Resource Estimate at Various Cut-off Grades - Sept 2012
 
CATEGORY
ZONES
 
TONNAGE
   
GRADE (g/t
   
CONTAINED
 
     
(Mt)
   
Au)
   
GOLD (oz)
 
Cut-off Grade of 0.6g/t Au
                 
 
Main
    21.86       1.52       1.07  
Measured (M)
Secondary
    1.52       1.11       0,05  
 
Total Measured
    23.38       1.49       1.12  
 
Main
    57.30       1.48       2.72  
Indicated (I)
Secondary
    13.95       1.26       0.56  
 
Total Indicated
    71.25       1.44       3.28  
Total Measured + Indicated
    94.63       1.45       4.40  
 
Main
    13.83       1.46       0.65  
Inferred
Secondary
    19.76       1.35       0.86  
 
Total inferred
    33.59       1.4       1.51  
Cut-off Grade of 0.8g/t Au
                       
 
Main
    16.50       1.78       0.95  
Measured
Secondary
    1.02       1.32       0.04  
 
Total Measured
    17.52       1.75       0.99  
 
Main
    42.21       1.76       2.39  
Indicated
Secondary
    9.19       1.55       0.46  
 
Total Indicated
    51.40       1.72       2.85  
Total Measured + Indicated
    68.92       1.73       3.84  
 
Main
    9.90       1.76       0.56  
Inferred
Secondary
    12.33       1.75       0.69  
 
Total inferred
    22.23       1.75       1.25  
Cut-off Grade of 1.0g/t Au
                       
 
Main
    12.32       2.08       0.83  
Measured
Secondary
    0.64       1.57       0.03  
 
Total
                       
 
Measured
    12.96       2.05       0.86  
 
Main
    31.20       2.06       2.07  
Indicated
Secondary
    6.40       1.83       0.38  
 
Total Indicated
    37.60       2.02       2.45  
Total Measured + Indicated
    50.56       2.03       3.31  
 
Main
    7.07       2.11       0.48  
Inferred
Secondary
    8.93       2.08       0.60  
 
Total Inferred
    16.00       2.04       1.08  
Source : Minxcon 2012
Mineral Resources reported including Mineral Reserves
Mineral Resources are in situ tonnes
Inferred Mineral Resource has a significant degree of uncertainty as to whether it can be mined economically. It cannot be assumed that all or any part of the Inferred Resource will be upgraded to a higher confidence category.
Apparent computational inconsistencies due to rounding
All figures are in metric tonnes
Resources for which environmental, permitting, legal, socio-political, issues were expected to materially affect the estimate
have been excluded
Tonnages and contents are stated as 100%
90% attributable to Asanko at production stage

Table 28 : Mineral Resource Estimate Reconciliation
 
MINERAL
CUT-OFF
COFFEY MINING
   
RESOURCE
GRADE (g/t
 
MINXCON 2012
DIFFERENCE (%)
CLASSIFICATION
Au)
2011
   
Tonnage (Mt)
       
Measured
0.8
3.26
17.52
437
Indicated
0.8
52.51
51.40
-7
Inferred
0.8
24.79
22.23
-18
Au g/t
       
Measured
0.8
1.50
1.76
17
Indicated
0.8
1.60
1.72
7
Inferred
0.8
1.50
1.76
17
Au Moz
       
Measured
0.8
0.16
0.99
519
Indicated
0.8
2.78
2.84
2
Inferred
0.8
1.30
1.26
-3
Source : Minxcon 2012
 
Graphic
 
 

 

June 2011
68

The higher grades in the Minxcon 2012 model are a result of a more selective mining methodology and better definition of higher grades which is appropriate for this type of mineralisation. Coffey Mining in 2011 used larger block estimates resulting in a smooth grade profile, especially at higher grade cut-offs. Previous work by Coffey Mining with a different approach, shows similar or even higher grades at specific cut-offs.

The improved modelled grades within the same estimated volume, at the same cut-off, have also resulted in an increase in metal content.
 
14. Mineral Reserve Estimate
NI 43-101 Item 15 (a), (b), (d)
The Mineral Reserve estimate has been prepared by DRAM 2013 and is based on the 2013 PFS independent
mining study (Section15) and the independent Minxcon 2012 Mineral Resource estimate (Section 13). The modifying factors applied are summarised in Table 29 and the Mineral Reserve estimate is presented in Table
30:-

Table 29 : Modifying Factors
 
FACTOR
 
UNIT
   
VALUE
 
No Inferred Resources included
           
Mining Recovery
 
%
      97  
Mining Dilution
 
%
      10  
Contract mining costs
 
USD/t mined
      3.23  
Total processing costs
 
USD/t
      16.64  
Gold Price
 
USD/oz
      1,400  
Specific gravity
          2.5  
Resource Block model cell size
    m       10x10x3  
Geological Losses
 
%
   
none
 
Metallurgical recovery LoM
 
%
      90.06  
Cut-off Grade
 
g/t Au
      0.6  
Stripping Ratio
 
waste:ore
      4.28  
Source : DRAM 2013
 
The Esaase Project gold resources which occur in satellite pits and which are currently deemed uneconomic to extract, were excluded from Mineral Reserve estimate. Furthermore, Mineral Resources which are affected by permitting, environmental, logistic and socio-political issues such as proximity to villages or forest reserves, were also excluded from the Mineral Reserve estimate. The eliminated tonnes and gold ounces are approximately 7.20Mt with a contained metal content of 0.48Moz Au (DRAM 2013).
 
The additional modifying factors applied in the conversion to Mineral Reserves relating more specifically to mining recovery, mining dilution, cut-off grade and metallurgical recovery, are summarised in Table 29. The cut-off grade was determined by a series of simulations and selection was based on Asanko Golds required grade and LoM as supported by the grade-tonnage curve presented in Figure 9.

Table 30 : NI 43-101 Compliant Mineral Reserve Estimate for the Esaase Project June 2013
 
PROVEN MINERAL RESERVES
PROBABLE MINERAL RESERVES
  TOTAL
   
CONTAINED
   
CONTAINED
   
CONTAINED
TONNAGE
GRADE
GOLD
TONNAGE
GRADE
GOLD
TONNAGE
GRADE
GOLD
(Mt) (g/t Au)
(Moz)
(Mt) (g/t Au)
(Moz)
(Mt) (g/t Au)
(Moz)
22.85
1.43
1.05
29.49
1.4
1.32
52.34
1.41
2.37
Source : DRAM 2013
Cut-off Grade 0.6g/t Au
Inferred Mineral Resources excluded from the Mineral Reserve estimate
Apparent computational inconsistencies due to rounding
All figures are in metric tonnes
Resources for which environmental, permitting, legal, socio-political issues were expected to materially affect the estimate have been
excluded
Tonnages and contents are stated as 100%
90% attributable to Asanko at production stage
 
Graphic
 
 

 

June 2011
69


A 'Mineral Reserve' is the economically mineable part of a Measured or Indicated Mineral Resource demonstrated by at least a Preliminary Feasibility Study. It includes diluting materials and allowances for losses that may occur when the material is mined. DRA is of the opinion that the classification of Mineral Reserves as reported in Table 30 meets the definitions of Proven and Probable Mineral Reserves as stated by the CIM Definition Standards (2005).

15. Mining Methods
NI43-101 Item 16
DRA Mining Proprietary Limited (DRAM) undertook the mining study component of the 2013 PFS, with the
assistance of CAE Mining Proprietary Limited (CAE Mining). The scope of the study included mine design, pit optimisation, mine production and scheduling and costing. The study base case was predicated on the Measured and Indicated Mineral Resources, as supplied by Minxcon 2012.

15.1. Mining Methodology
NI43-101 Item 16 (a)
The appropriate mining methodology for the Esaase Project comprises conventional open pit drill and
blast mining, followed by load and haul to various stockpiles. The drilling and blasting would be performed on benches between 10m and 20m in height. The total material movement at the Esaase Project is estimated between 30Mtpa and 35Mtpa and a mining fleet of 290t excavators and 90t capacity dump trucks would be appropriate for the scale of mining envisaged. Ore and waste boundaries would be delineated on each flitch with tape and paint markers based on grade control and geological modelling and interpretation. Bench and face mapping, for grade control as well as for geotechnical reasons, will be a routine task in finalising the ore and waste boundaries to be marked out for excavation.

A strategic decision to undertake owner mining versus contract mining depends upon the risk associated with either methodology, corporate issues involving best use and return on capital and local operational conditions. For the purpose of the PFS, Asanko Gold opted for the mining study to be conducted on a contract mining basis.

15.1.1. Geotechnical Review
NI43-101 Item 16 (a)
The geotechnical information for the mining study was provided by Coffey Mining and
independently reviewed by the geotechnical consultant from Open House Management Solutions Proprietary Limited (OHMS). For the purpose of the pit optimisations, the following information was approved by OHMS as being appropriate and suitable for use in pit
optimisation:-

     pit slope applied to fresh material - 52°;
 
     pit slope applied to transitional material - 45°; and
 
     pit slope applied to weathered material - 35° .
 
15.2. Pit Optimisation
NI43-101 Item 16 (a)
The Esaase Project pit optimisation study was undertaken on Whittle Four-X optimisation software on the mineral resource models provided by Minxcon 2012. Two separate pit optimisation scenarios were compared namely:-

       optimisation based on the "total mineral resource", including Inferred Mineral Resources, for the purpose of resource drilling and infrastructure placement; and

       optimisation based "Measured and Indicated Mineral Resources" only, for the Mineral Reserve estimate.
 
Whittle Four-X software calculates, for a given mineral resource block model, cost, recovery and slope data; a series of incremental pit shells in which each shell is an optimum for a slightly higher commodity price.
 

 
Graphic
 
 

 
 
June 2011
70

 
The sequence of the pit shell increments is sorted from the economically best (the inner smallest shell viable for the lowest commodity price) to the economically worst (the outer largest pit shell viable for the highest commodity price).

Whittle Four-X provides indicative discounted cash flows (DCF) for two mining sequences called "best case" and "worst case" scenarios, both using time discounting of cash flows. In the best case, the optimum pit shells are mined bench by bench in increments from inner to the outer shell, resulting in a higher NPV due to lower stripping ratios and/or higher grades in the early years of mine life. The worst case scenario is based on mining the whole pit outline bench by bench as a single pit, hence resulting in a lower NPV as a result of high stripping requirements in the early years of the operation.

After the selection of the ultimate pit, several practical mining stages are designed and sequenced when developing a final production schedule, which provides an NPV between the worst and best case scenarios. The average NPVs are calculated for each pit shell (mean of the worst and best cases) in order to emulate a practical mining sequence. The cash flows are exclusive of any capital expenditure or project start- up costs, and should be used for pit optimisation comparison purposes only as they are not indicative of the Project NPV.

15.2.1. Pit Optimisation Input Assumptions and Parameters
NI43-101 Item 16 (a), (b)
Prior to the pit optimisation process, all cost and technical parameters were designed to emulate the required mining parameters based on the information available to DRAM prior to the outcome of the 2013 PFS. The mineral resource block model was re-blocked to coincide with the bench height of 10mx10m (along strike) and the input parameters and assumptions applied are summarised in Table 31. The initial 2013 PFS optimisations were undertaken at the "PFS Values" noted in Table 31 but post PFS new input values were obtained through various other optimisations and the "New Values" column shows those inputs that were modified and included in mine design that will form the basis of the DFS. The new modified inputs related to optimisation of the mining and processing costs.

Asanko Gold selected to conduct the PFS on a base case utilising contract mining as opposed to owner operations. DRA obtained four independent contract mining company quotations for the 2011 PFS which were escalated for inflation to 2013 and normalised for comparative purposes. The average mining cost obtained from the quotations was USD3.55/t and ranged USD3.39/t to USD3.70/t. A Project conceptual mining opex figure of USD3.23/t for the mine design was obtained by combining DRAs database of costs, for similar operations and average costs from the quotations obtained. Mobilisation, site establishment, demobilisation, clearing and topsoil stripping costs formed part of capital expenditure and thus, not part of operational expenditure. As the PFS progressed and more detail became available, the opex was optimised and refined but these optimisations will be included in the DFS.

15.2.2. Pit Optimisation Results
NI43-101 Item 16 (b)
The initial optimisation produced a main pit with various satellite pits in accordance with the plan view of the Mineral Resources shown in Figure 9. Only the Main Pit and South Pit were included in the mining study and the North Pit, the northern rim of the Main Pit and Zones B and D were excluded as they contain design inefficiencies and are subject to mine concession restriction and the shell perimeters encroach the surrounding villages.

The optimum pit shell for the "total resource" scenario at PFS input values (Table 31) is Pit 31 which reached a depth of 40mamsl, or approximately 230m below the Bonte River valley surface. Pit shell 31 contains 53 Mt of mill feed at 1.42 g/t Au for 2,189koz of recovered gold (Table 32). A total of 198Mt of waste are contained within the pit, equating to a waste to ore stripping ratio of 3.7:1.
 

Graphic
 
 

 

June 2011
71


Table 31 : Pit Optimisation Input Parameters and Assumptions
 
     
PFS
       
PIT DESIGN ASPECT
UNIT
  VALUE    
NEW VALUE*
 
RoM production
Mtpa
    5        
Real Discount rate
%
    10        
Mining recovery
%
    97        
Mining dilution (assumed)
%
    10       8  
Contract mining cost (based on quotations)
USD/t
    3.23       2.56  
Total Processing costs ( based on DRA estimates)
USD/t
    20.54          
*Processing variable costs
USD/t
    14.18       9.74  
*Processing fixed cost allocation
USD/t
    2.46       0.73  
*Ore incremental
USD/t
    1.00       1.8  
*Processing general administration costs
USD/t
    2.90       2.6  
Gold price
USD/oz
    1,400          
Royalty
%
    5.5          
Oxide material pit slope
Degrees
    35          
Transition material pit slope
      45          
Fresh material pit slope
      52          
Source : DRAM 2013
*Variations between the Whittle inputs and press release figures are due to evolvement of the Project post completion of the Whittle optimisation


The optimum pit shell for the "Measured and Indicated Resource" scenario at "PFS input values" (Table 28) at a cut-off grade of 0.6g/t Au was Pit 31 but Asanko Gold selected Pit 34 as it offered a longer LoM and an increase in gold recovered (Table 32). Pit shell 34 reached a depth of -19mamsl, or approximately 290m below the Bonte river valley surface. Pit shell 34 contains 59.5Mt of mill feed at 1.4g/t Au for 2,680koz of gold. A total of 244Mt of waste are contained within the pit, equating to a waste to ore stripping ratio of 4.1:1. Pit 34 was selected as the basis for the detailed mine design and the results of the final pit design are presented in Table 32.

The optimum pit shell for the "Measured and Indicated Resource" at the optimised new input values for the future DFS is presented in Table 32.
 
15.2.3. Pit Selection and Mine design
NI43-101 Item 16 (b), (c)
The 2013 PFS detailed pit design was based on the "Measured and Indicated Resources" scenario for Pit 34 at the PFS input values shown in Table 32, at a mining cost of USD3.20/t (Table 31) which reflects a contractor mining scenario for which the mine does not purchase the equipment. The design included only the Main and South Pits whilst the North and satellite were excluded (see Section 15.2.2) (Figure 11, Figure 15).

Table 32 : Pit Optimisation Results
 
ITEM UNIT TOTAL RESOURCES    MEASURED AND INDICATED
    INCLUDING INFERRED- PFS MEASURED AND INDICATED RESOURCES - OPTIMISED  
    INPUTS RESOURCES-PFS INPUTS INPUTS  
    PIT 31 Based on PIT 34 PIT 34
               
Ore Mt 52.99   52.34   74.12  
Waste Mt 198.25   224.25   356.23  
Total Mt 251.24   276.59   430.35  
Stripping Ratio   3.74   4.28   4.81  
Product   Input Recovered Input Recovered Input  Recovered
In situ gold Mg 75.37 68.10 73.75   102.27 92.61
In situ gold Moz  2.42 2.19 2.37 2.14    
Input grade g/t 1.42   1.41   1.38  
Pit utility % 0.74   0.73   73.30  
NPV USD 596.70       1,005.71  
Life of Mine   10.64   12   15.9  
Source : DRAM 2013
 
Graphic
 
 

 
Graphic
 
 
 

 
 
June 2011
73
 
The mine design is based on a minimum pit base width of 30m and a minimum cutback width of 50m. The haul roads have gradient of 10% and dual/single lane widths of 25m and 15m respectively.

The Main and South Pits were developed in 9 pushbacks, with the South Pit being mined within four years in order to supply backfill material (Figure 11).

15.2.4. Waste Dump Design and Site Plan
NI43-101 Item 16 (c)
A base case mine layout site plan was initially developed for the 2013 PFS with elements based on the 2011 layout. Optimisations in the course of the 2013 PFS indicated that a revised site layout would prove beneficial and the two plans are presented in Figure 14 and Figure 15 (see Section 0). A quantity of approximately 224Mt of mine waste has to be disposed of during the Project LoM and based on an average waste bulk density of 2.55t/bcm and a swell factor of 30%, after dump compaction, a dump volume of approximately 114Mm³ will be required to store the mine waste.
 
The issues that must to be considered in evaluating the best option for a waste storage areas include the following:-

     storage capacity;
 
     limiting visual impact;
 
     haul distance and disposal costs;
 
●     site drainage; and
 
     site access and preparation
 
The waste dumps for the purpose of the 2013 PFS entailed no detailed design. The dump volumes were constructed using the 1:4 slope recommended by Epoch, to determine overall foot print estimated to a swell factor of 30% after compaction, dump overall slope of 14° and an angle of repose of 37°. The EPA approved practice in Ghana of permitting dump slopes of between 20 and 30 would provide potential for optimisation and this will be investigated in the DFS.
 
Waste material will be dumped in three different dump locations (Figure 15) namely west of the main pit close to the RoM pad, to the south east of the Main Pit between the sacred forest and Esaase village and on southern half of the South Pit (Figure 15). Some of the waste material will be used for road terracing (1Mbcm), TSFs (18Mbcm) and backfilling of the South Pit (19Mbcm).
 
The required combined capacity for the waste dumps is reduced as a result of the waste requirement for other mine infrastructure items and by backfilling the South Pit. The waste dumps reach a maximum height of 550mamsl, cover 362ha combined with a combined capacity of 111Mm³.
 
The waste dumps will be built by tipping from ground level upwards so as to lessen the vertical climb by the dump trucks early on to reduce costs. The dumps will be progressively rehabilitated with topsoil, where possible. The surfaces of dumps will be contoured to minimise batter scour and ripped at 1.5m centres to a depth of 400mm, where practicable. All such rehabilitation work will be carried out progressively. Rock-lined drains will be constructed, where required, to ensure excess run-off is controlled and directed down to sediment traps. The waste dump design will incorporate features to minimise the effect of leaching of contaminants.
 
Graphic
 
 

 
 
June 2011
74

15.3. Mine Production Schedule
NI43-101 Item 16 (b)
The mine production schedule is based on an annual processing rate of 5.0Mtpa with a mining limit set to 35Mtpa annum for waste and ore combined giving an average LoM stripping ratio of 4.28:1. The mining limit did not restrict the ability to supply the plant with the full capacity of 5Mtpa.

The pre-production is defined production until the process plant is commissioned. The pre-production includes establishment of the haul roads from the pit to the RoM pad and waste dumps; generation of a minimum of three weeks mill feed ready for plant commission and the generation of waste for infrastructure construction. The operating ramps and initial benches that will supply mill feed will also be prepared during the pre-production stage. The first three months of the mine schedule (Figure 12) comprise this necessary pre-production.

Mining will commence during the pre-production in both Main and South Pits and as the South Pit is located closer to the starter tailings embankment it will provide waste material for the starter dam. A portion of the waste mined from the Main Pit during pre-production will be utilised to build the RoM pad.

After the pre-production phase has been completed, the Main Pit remains the principal source of RoM, with South Pit contributing, on average, a third (±31%) of the overall tonnes mined for the first four years until its mined out and ready to be backfilled (Figure 12).

The Main Pit is the primary source of mill feed with over 85% of the total mill feed arising from this pit. The pushback schedule is summarised in Figure 11. The South Pit can be mined independently from the Main Pit with a saddle separating the two pits. The South Pit is initiated during pre-production and is essentially completed at the beginning of Year 5.

The mine production schedule was developed for the PFS on a monthly basis for the first year and quarterly thereafter and is based on bench by bench mining of the quantities calculated within the individual pit stages and pushbacks. The mine production schedule is presented in Figure 12.

15.4. Mining Fleet and Labour Requirements
NI43-101 Item 16 (d)
The contractor mining fleet will consist of four hydraulic excavators (Cat.6030) with a bucket capacity of between 20t and 30t, and 28 off highway dump trucks (Cat 777D) with capacities of 90t. Rigid frame diesel trucks have been used in the mining of large open pits for many years and are appropriate for the Esaase Project operation. In addition 6 Dozers and two graders would be required, together with service trucks, drill rigs and wheel loaders.
 
15.4.1. Labour Requirements
The mining operations are scheduled to work 365 days in a year, less unscheduled delays such as high rainfall events which may cause mining operations to be temporarily suspended. The labour requirements for the mining operation including owners team and contractors staff are summarised in Table 34.
 
Table 33 : Esaase Project Mining Labour Requirements
 
 
MANAGEMENT
TECHNICAL SERVICES
PRODUCTION STAFF
 
  TOTAL
 
ADMIN
GEOLOGY
MINING/SURVEY
SUPERVISION
OPERATORS
   
Owners team
214
12
30
031
Contractor team
18
0
   062 266  70  416      
Source : DRAM 2013

15.5. Drill and Blast Parameters
Rock fragmentation will be undertaken by drilling and blasting and it was estimated that 50% of the weathered material and 100% of the fresh material will require blasting. The pit configuration bench height and waste material type anticipated at the Project suit drill rigs capable of drilling drillholes with a diameter of between 115mm and 165mm. Drill burden, spacing and sub-drill design will be functions of the varying material types of the deposit.
 
Graphic
 
 

 
 
Graphic
 
 
 

 
 
June 2011
76
 
An emulsion based blasting product with water resistant characteristics and high velocity of detonation is recommended to achieve a better fragmentation. The blast pattern is dictated by the powder factor required to ensure appropriate fragmentation and heave.

The selection of the powder factor is based on the UCS (Unconfined Compressive Strength) measurement results obtained from the preliminary excavation characterisation work. For weathered material the UCS range is between 8MPa and 12MPa, which suggests a very weak rock. For fresh material the UCS range is between 28MPa and 80MPa, which suggests a weak to moderately strong rock.

The Project is located in the vicinity of four communities. Definition of risks associated with drill and blast activities, and procedures to mitigate these risks will be addressed in detail during the DFS. A detailed Environmental Blast Design Report was generated for the 2013 PFS by Terrock 2013.

15.6. Haulage Roads and Pit De-watering
All haul-roads, dumps and stockpiles that will be required for the LoM will be constructed during pre-production. The beneficial results of improving haul road design are efficiency of haulage by reduction in cycle time, reduced fuel usage and reduced truck component wear. The recommended haul road width within the mining area is 20m wide, excluding drainage and shoulders.

The pit water management will primarily consist of run-off control and sumps. As the LoM pit will be operating at depths greater than 200m below surface, specialist high lift pumps will be required. Pontoon mounted pumps will be used to draw from sumps to ensure the pumps are not submerged as sump water levels rise rapidly in response to a rainfall event. The key operational requirements will be to:-

       minimise water flow into the pit using perimeter bunds, drains and fill, where practicable;
 
       provide pit pumping capacity for foreseeable extreme events;
 
       maintain pit wall drainage;
 
       provide permanent and temporary sumps capable of handling the expected water inflows; and

       installation of settling ponds for the removal of solids prior to discharge offsite.
15.7. Grade Control
Crusher feed quality control for the Project will be a critical component of the success of the operation. Production control relies on different levels of mine planning in daily blending operations. Plans are developed with different levels of accuracy for different time periods, including daily, weekly, monthly, yearly and LoM. Reconciliations of production and RoM quality against these plans will form part of mine planning procedures.

Bench and face mapping, for grade control as well as for geotechnical reasons, will be a routine task in finalising the ore and waste blocks to be marked out for excavation. Blast hole sampling is recommended as a test to identify the suitability of utilising the vertical blast holes for grade control purposes. Sampling of every blast hole has been allowed for in the lab under the processing costs.
 
16. Recovery Methods
NI 43-101 Item 17
The process design for the Esaase Project was undertaken by DRA and independently reviewed by Venmyn Deloitte (2013) in a document entitled "Asanko Gold - Esaase Project Metallurgical Report" by R Heins (May 2013). Five phases of metallurgical testwork have been completed for the Esaase Project, the results of which are presented in Section 12. The metallurgical testwork results indicate that the Esaase Project gold mineralisation is amenable to the proposed process design and the final design selection will be a function of recovery optimisation and financial considerations.
 
Graphic
 
 

 
 
June 2011
77
 
A high-level financial trade-off between the "Flotation Included" and "Flotation Excluded" routes was undertaken as the basis of selection for the most viable processing route for Esaase Project. The plant recoveries used in the financial analysis are presented in Table 20 and the estimated capital and operating expenditures (capex and opex ) for the two process routes are as follows:-
 
Table 34 : Process Trade-off Capital and Operating Costs
 
 
FLOTATION
FLOTATION
 
INCLUDED
EXCLUDED
Process Plant Operating Cost (USD/t)
10.37
15.34
Process Plant Capital Cost (USDm)
93.20
109.00
Source : DRA 2013
Includes USD10.3m EPCM

The financial trade-off indicated that the processing route which comprised gravity recovery within the milling circuit, flotation on gravity tailings, with a leach on the flotation concentrates (Flotation Included) resulted in reduced process plant capital and operating cost with a marginal reduction in LoM recovery of 0.52%, reduced capital cost and environmental risk associated with the L-TSF, which in combination resulted in increased project NPV.

The basis for the design aspect selection and final criteria are summarised in Table 35:-

Table 35 : Process Design Selection and Criteria
 
DESIGN ASPECT
TESTWORK BASIS FOR SELECTION
FINAL CRITERIA
 
Amdel showed 30% Au>106µm suggesting finer
 
Grind size
 
DRA review of results targets 80% passing 75µm
 
grind would be beneficial.
 
Mill
DRA in-house simulations
Ball mill size 7.16mx10.8m with total installed power of
   
13.2MW)
   
Primary Knelson concentrators positioned on cyclone
Gravity recovery
Modelling and simulation in previous phases
underflow in milling circuit. Also secondary gravity
   
concentrator in regrind milling circuit
Flotation
Previous flow sheet used spirals but arsenic would
Flotation instead of spirals would handle fine free gold
 
be difficult to remove.
and gold with sulphides
   
Laboratory flotation residence time of 16.5mins selected
 
Kelsall rate constants used to predict recoveries and
for mass-pull of 9% on fresh material, scaled up by a
Kelsall parameters
mass-pull at different residence times
factor 0f 2.5 to allow 41.2min residence time for full-scale
   
plant operation
 
Phase V flotation concentrate leach results showed
 
Concentrate regrind
3.4% improvement in recovery at a 25µm grind size
Vertimill has been included in the design for regrinding
 
as opposed to 25µm.
the flotation concentrate
 
Phase V testwork concluded addition of carbon with
 
CIL
no pre-leaching for F80 of 25µm gave a CIL residue
Scope to reduce CIL residence time in next study phase
 
grade of 0.15g/t Au
 
 
SO2/air system for destruction of WAD cyanide to
 
Cyanide and arsenic
below 50ppm. The design is for <50ppm CHwad and
SO2/air system for destruction of WAD cyanide and
detoxification
1.0ppm As in process plant tailings. Laboratory tests
inclusion of arsenic precipitation from the tailings solution
 
achieved CNwad levels of <25ppm
using ferric chloride at pH 8
TSF
Two TSF required to accommodate flotation tailings
The design permits a lined TSF for the cyanide tailings at
 
and cyanide tailings
9% of previous size estimate with capital savings
Source : DRA 2013

16.1. Process Description
NI 43-101 Item17 (a), (b)
The recommended process flow sheet for the gravity-flotation-CIL process plant is presented in Figure 13 and described in summary in Table 36.
 
Graphic
 
 

 
 
June 2011
78
 
Table 36 : Recommended Process Flow for Esaase Project
 
PLANT COMPONENT
SYSTEM DESCRIPTION
PRODUCT STREAM
COMMENTS
Ore Receiving
Rom treated in open circuit primary crushing system
   
Primary crushing
RoM bin and gyratory crusher
195mm
Water spray dust suppression
system
     
Secondary crusher
Belt feeder and conveyor from primary crusher.
90mm
Hammer sampling station for grade
 
Secondary cone crusher
 
control on RoM stockpile
Oxide material by-pass
Oxide from primary crusher directly to mill by-passing
   
 
secondary crusher and stockpile
   
Mill feed stockpile
Belt feeder and conveyor from secondary crusher.
   
Mill hopper
Ball milling circuit fed 635t/h dry RoM stockpile feed.
   
 
Water added to controlled density 70% solids.
   
Mill discharge sump
Screen underflow to closed circuit cyclones
   
screen
     
Mill cyclone
Overflow gravity fed to flotation circuit
35% solids
 
 
Portion of cyclone underflow to two Knelson XD-48
   
Primary gravity
concentrators each treating 400t/h pre-screened
   
 
material. Diluted to 60% solids by mass. Screen oversize
3t/d high grade concentrate
Fenced for security
concentration
to mill feed conveyor. Screen underflow gravitate to
   
 
gravity concentrators
   
 
Gravity concentrates collected in dewatering cone with
98% Au extraction in
 
Intensive leach reactor
an underflow of 60% solids which is sent on a batch
pregnant leach solution to
Spillage collected and pumped to CIL
(ILR)
basis to the reactor. Batch solution of cyanide and
electrowinning cell feed
sump. Safety shower,
 
caustic soda leach.
tank
 
   
Flotation concentrate
 
 
Cyclone overflow from milling circuit gravity feed. Single
 
Area serviced by two spillage pumps.
 
bank of seven 130m3 forced air rougher flotation cells.
collected in agitated
Safety shower installed.
Flotation
 
concentrate tank
 
 
Tailings sampled and collected in tailings tank and
   
 
pumped to TSF
   
 
Flotation concentrate to de-sliming cyclones on regrind
   
 
circuit. Cyclone overflow to pre-leach thickener.
   
Regrind mill
Underflow to Vertimill to achieve size reduction to 20µm.
Underflow at 70% solids
 
 
Regrind product gravitates to sump where density
regrind to 20µm.
 
 
controlled by dilution water added from mill outlet, elution
   
 
and gold room.
   
   
Concentrate to intensive
 
Secondary gravity
 
dissolution reactor. Tailings
 
 
Sump contents to secondary gravity concentration unit.
   
concentration
 
to flotation concentrate
 
   
sump
 
Pre-leach thickener
Increase density of cyclone overflow in regrind circuit
45% solids to be pumped to
 
   
CIL circuit
 
 
Seven 330m3 tanks in series linked by Kemix inter-tank
Au grade 0.15g/t in tailings
Hydrogen cyanide and ammonia gas
 
pumping screens. Lime for pH control and cyanide added
and solution tenor of
detectors installed. Safety showers.
 
to the first tank
<0.01ppm
 
CIL
Design carbon loading of 2,500g/t and a loaded carbon
   
 
batch size of 5t/day
   
   
Carbon to elution circuit
 
 
Loaded carbon pumped to vibrating screen
and slurry underflow back
 
   
to CIL tank
 
 
CIL tailing pumped to detox circuit of three agitated and
   
Cyanide destruction
air sparged 150m3 tanks in series. SO2/air process in two
Tailing <50ppm CNWAD
Hydrogen cyanide gas and WAD
 
tanks
 
cyanide detection installed at TSF
 
Third tank in above series will have ferric chloride added
Tailing solution <1.00ppm
 
 
the precipitate As. Tailings disposal comprises conical
   
Arsenic precipitation
agitated tank and pumps.
As
 
 
TSF return water to process water tank
   
 
CIL carbon treated in elution circuit comprising acid wash
   
 
and 5t elution column with heater. CIL carbon treated in
   
 
5t batches once every 24hrs.
   
Elution
Carbon acid washed in 3% HCl solution then loaded by
Eluted carbon removed and
 
 
gravity into the elution column. Carbon pre-treated with
sent to carbon regeneration
Spillage collected and pumped to CIL
 
solution containing 3% cyanide and 3% caustic soda.
kiln. Carbon fines to the
circuit
 
Heated to 125⁰C
tailings and oversize to CIL
 
   
circuit
 
 
Pregnant solution from Acacia reactor through
Solution re-circulated for
 
 
electrowinning cell
18hrs or until barren
 
 
Pregnant solution from CIL circuit circulated through four
solution attained. Gold
 
 
cells in parallel
sludge collected
 
Electrowinning
Barren solution tested and pumped to CIL circuit for
   
 
disposal
   
 
Loaded cathodes removed from cells and gold sludge
Gold bullion bars and slag.
Hydrogen cyanide gas and ammonia
 
washed off with high pressure. Gold sludge dried, mixed
Slag crushed and returned
gas detection installed . Various
 
with fluxes and smelted in induction furnace
to ball mill circuit
security systems installed
Source : DRA 2013
 
Graphic
 
 

 
 
June 2011
79
 
16.2. Process Infrastructure and Reagents
NI 43-101 Item 17 (c)
The Esaase processing plant will be supplied by borehole stored in a 500m3 raw water tank. Raw water, process make up water and feed to a potable water plant will be withdrawn from the raw water tank. Fire water allowance will be made within the raw water tank, in accordance with IMIU fire water requirements.
 
Process water will be stored in a process water dam along with pre-leach thickener overflow excess and tailings return water. Process water requirements will be withdrawn from the process water dam which will have a capacity of 8,000m3.
 
Compressed process and instrument air will be supplied via dedicated compressors, while oxygen requirements for CIL will be supplied by a dedicated 10t/day PSA plant. Instrument and plant air requirements for the entire plant will be supplied by two dedicated compressors, one running and one on standby with air filters and driers. Air requirements for general use in the plant and workshops will be tapped-off before the instrument air driers.
 
Low pressure blower air for the flotation and detoxification circuits will be supplied by three blower units and two dedicated blower units respectively, the latter of which will be a standby unit.
 
The reagents to be used in the process are summarised in Table 37:-
 
Table 37 : Process Plant Reagents
 
REAGENT
SPECIFICATION
QUANTITY
   
Liquid 1,000L bulk
Frother
Aero 9967, MX gold
containers
HCl
33% strength containers
1,000L bulk containers
Flocculant
 
25kg bags
Activator
Copper sulphate made up to 15% solids solution
1,250kg bags
Sodium Metabisulphate
SMBS made up to 20% solids solution
1,200kg bags
Diesel
Stored in sealed tank for delivery to elution heaters,
 
 
carbon regeneration kiln and furnace
 
Caustic Soda
Solution made up to 20% solids
 
Sodium cyanide
Supplied as briquettes mad into 20% solids solution
 
 
CaO 85% to 90%. Solution made up to 20%
 
Hydrated lime
 
1,000 bulk bags
 
solution strength
 
Collector
PAX collector pellets solution 15% concentration
25kg bags
Ferric chloride
20% solution strength
Delivered as a powder
Lead nitrate
20% solution strength
 
Source : DRA 2013
 
17. Project Infrastructure
NI 43-101 Item 18
The designs of the supporting infrastructure required for the proposed Esaase mine were developed by DRA in consultation with the Asanko Gold owners team and other independent specialist consultants, principally Epoch for the TSF designs, Coffey Mining Geotechnics for the water balance and hydrogeology and Knight Piesold for the geotechnical investigations. Numerous sampling, drilling and excavation programmes were undertaken to provide samples and technical information for the various specialist studies to be undertaken, as summarised in Table 39.-

17.1. Geotechnical Investigation
The independent geotechnical investigation was undertaken by Knight Piésold Consulting at the proposed location of key infrastructure including process plant site, TSF sites, RoM pad, mine services area, waste rock dump sites and haul roads. The investigations undertaken are summarised in Table 39 and the bulk and undisturbed samples taken provided:-

       natural moisture content to determine the in situ moisture regime;
 
       Atterberg limits and particle size distribution tests to determine the basic engineering properties of the in situ soils and for classification purposes;
 
Graphic
 
 

 

Graphic
 
 

 
 
June 2011
81
 
       crumb dispersion tests to determine the separation of soils into single particles;
 
       dry density / moisture content relationship;

       consolidated un-drained triaxial compression test on re-moulded samples to determine the strength and stress-strain relationship of the soil samples;

       consolidation test to determine the settlement characteristics of the soils;
 
       falling head permeability test on re-moulded and some undisturbed samples, and

       pH and sulphate content (SO3).
 
17.2. Esaase Mine Site Layout
The proposed Esaase mine site is characterised by the low gradient Bonte river valley which is surrounded by short, steep contributing catchments with pronounced changes in elevation. The topographic elements of the area have a material influence on the size, positioning and operation of facilities and infrastructure associated with the Project as shown in Figure 15.

Two alternative site layout plans were developed for the 2013 PFS as shown in Figure 14 and Figure 15.
Both site plans included the following elements:-

       5Mtpa RoM processed through a gravity-flotation-CIL plant;
 
       plant location in the valley between the villages of Tetekaaso and Tetrem west of Main Pit;

       reduced pit configuration of the Main Pit and exclusion of the North Pit;
 
       plant tailings are processed into two streams, namely a CIL tailings stream to be sent to the lined TSF (L-TSF) accommodating approximately 10% of the tailings and a flotation plant tailings stream to be sent to a clay lined TSF (F-TSF) accommodating 90% of the tailings; and

       a buffer water storage dam configured as a return water dam collecting decant from the F-TSF and sized to store make-up water storage requirements under dry rainfall conditions and to prevent discharge of contaminated water exceeding discharge standard under wet conditions.


The key differences between the base case and improved case plant site configurations are summarised in Table 38:-
 
Table 38 : Site Layout Option Comparison
 
INFRASTRUCTURE
BASE CASE SITE LAYOUT (Figure 14)
IMPROVED SITE LAYOUT (Figure 15)
Waste Rock Dump (WRD)
Single WRD located approximately 3-4 km to west
Multiple smaller WRDs located within pit blast
 
of main pit
radius
Flotation circuit tailings TSF (F-
Located approximately 5 km to north east of main
 
TSF)
pit
Located in position of Base Case WRD
 
Located south of F-TSF approximately 4km north
Located downstream of Mpatoam on Esaase
Buffer storage dam
west of main pit
concession boundary
Source : DRAM 2013
   
 
The study provided preliminary information that was utilised in the positioning of the plant, contractors terrace, RoM pad and conveyor belt. Further geotechnical investigations will be undertaken in support of the foundation design of the various plant structures. The bulk earthwork requirements were determined and can be supplied from the various residual soils, altered clay rich material and more incompressible weathered schist available within the Project area.
 
Graphic
 
 

 
 
June 2011
82
 
Table 39 : Specialist Studies undertaken for the Infrastructure Design
 
 
 SPECIALIST      
 
7.5
CONSULTANT
DATE SCOPE OF STUDY INVESTIGATION RESULTS
         
Bulk samples and undisturbed samples for laboratory testing. Geological and
Geotechnical
       
geotechnical conditions for each site characterised and defined. Soils affected by tropical
         
weathering laterite, residual soil, completely weathered rock and highly weathered rock.
         
Moderately strong basement rock which is incompressible.
           
     
Geotechnical investigation of
 
Valley floor alluvial/colluvial soils higher capacity for bearing failure. Higher up the valley
Geological
Knight Piesold Consulting
 
process plant site, TSF site,
7 drillholes by i PMI
residual soils <2m deep and foundations to be dug to weathered schist. Conveyor
 
and drilling by
2012
RoM pad, mine services
Limited between 14m
positioned on a raised embankment of engineered fill. RoM pad on thin residual soil and
 
independent PMI Limited
 
area, waste rock dump and
and 20m. Test pits- 26
completely weathered rock-foundations for crushers must extend to the schist.
      haul roads
dug to 4m
 
         
Topsoil stripped to 300mm and stockpiled. Plant key components located in a cut-section
         
to 2m to 3m deep to ensure bearing pressures down to weathered schist. Remainder
Earthworks
       
plant and contractor terrace requires 275,000m3 fill. RoM pad and contractors camp
         
requires 615,000m3 fill. Buffer dam requires 250,000m3 fill and will be lined with in situ
         
compacted clay.
Site Water
   
Baseline meterology, hyrological and hydraulic studies,
 
management
HR Wallingford 2011
Offin River rating curve, Mpatoam weir rating
 
     
assessment
   
         
Aver annual rainfall 1,382mm. Aver annual evapo-transpiration - 1,340mm. Wettest
Meterological
HR Wallingford
     
month - June 214mm. Maximum 534.5mm, 168mm in one day. Wettest year 2,428mm.
         
Lowest rainfall recorded over 5months <90mm.
           
         
Project located in headwaters of the Bonte river catchment. Bonte is a tributary of the
         
Offin river. Bonte river flow east to west across northern extent of Main Pit. 3km
Hydrology
       
downstream is the Mpatoam weir with 32km2 catchment area. Weir data shows that the
         
Bonte river in the Project area is dependent on rainfall with negligible dry season base
         
flow. ground water not a significant contributor to river flow.
           
       
Three phase drilling
Investigated groundwater contours across site and high yield areas such as the saddle
     
Hydrogeological investigation
programme. 28
between the Main and South Pits. Yields vary between 0L/s to .30L/s. Standing water
 
Coffey Geotechnics
  to understand groundwater drillholes to a
levels at July 2011 - vary between 272mamsl and 356mamsl. Max water yield depths
Hydrogeological
Limited
2009
conditions on site
maximum depth of
vary between 25m and 90m.
        157m
 
           
Community monitoring
   
Provide baseline data for
10 borehole drilling
 
 
Asanko Gold
2012
groundwater at existing
programme  
boreholes
    villages    
           
      Hydrogeochemical modelling
Extensive sampling
 
  Environmental
2012 to
of the mine site and kinetic
from village hand
Results presented in Table 44. Arsenic present in groundwater as primary contaminant,
Geochemistry
Geochemistry
2013 leach tests on arsenic
pumps, community
exceeding GWC guidelines of 0.01mg/L soluble arsenic.
  International Limited  
release
monitoring boreholes
 
       
Esaase pit boreholes
 
           
     
Update since previous DFS
 
Three tier approach. Level 1:- closed process and TSF circuit with make-up water from
Water balance
Coffey Geotechnics
2012
as site configuration
 
pit dewatering. Level 2: site water capture and pit dewatering. Level 3:- rainfall within
 
Limited
 
completely refigured.
 
mine catchment released to the Bonte river
 
Power
Gridco - state utility
 
Feasibility study for34MW
   
  company
2012
power supply    
Source : DRA 2013

Graphic
 
 

 

Graphic

 
 
 

 

Graphic
 
 
 

 

Graphic
 
 
 

 
 
June 2011
86
 
17.3. Esaase Project Power Supply
Two options exist for the power supply to the proposed Esaase mine, namely an off-grid connection to the national state utility company Gridco or IPP supply. The 2013 PFS was initially based on the national power supply option, however the capital cost and time to construct the GridCo connection was considered excessive, in addition to concerns regarding the reliability of supply and constrained capacity in Ghana. Asanko Gold is undertaking a study on alternative sources of electrical power with the purpose of completing a trade-off study.

17.3.1. National Power Grid Supply
The Ghanaian utility company, GridCo, prepared a feasibility study in January 2012 for a 34MW point of supply, based on a 7.5Mtpa production, which would include a compensator to help stabilise the supply at a total cost of USD32m. The cost may be significantly reduced if a reduced maximum demand is applied and by redesign of the connection by placing a new 161 kV substation on the main line which would utilise a single 11km 161 kV overhead line to feed the mine. The new 161kV substation would be located between Kenyase and Obuasi sub- stations and would fall under the auspices of GridCo and the battery limit between GridCo and Esaase would be the 11kV terminating structure from GridCo.

The mine power supply study is based on the reticulation of power across the mine site at 11kV to be from the grid via the mine consumer sub-station, located adjacent to the plant. Based on a mine production level of 5Mtpa, the total load presented to the grid is estimated to
be:-

     connected: 34.1MVA (28.0 MW); and
 
     running: 23.6MVA (19.3 MW) - no power factor correction (19.7MVA (19.3 MW) - power factor corrected to 0.98.
 
The conceptual designs for the medium voltage power supply, 11kV switchgear, 6.6kV switchgear, sub-station, fire detection systems, transformers, motor control centres, earthing, control and instrumentation and lighting have all been undertaken for the PFS and are reported in detail in the DRA PFS study document. The beneficiation plant will be fully automated by use of Programmable Logic Controllers located in the Motor Control Centre via Supervisory Control and Data Acquisition (SCADA) system.

17.3.2. Independent Power Producer
The costs of the Gridco option for power supply to the proposed Esaase mine are high and Asanko Gold is investigating various alternative options. American based company USP&E Global, which supplies heavy fuel oil (HFO) power generators, diesel and natural gas turbines and renewable power plant installations, has provided a quotation for the supply, installation and commissioning of an on-site power plant.

The proposed power plant will comprise a 14MW reciprocating engine powered by either heavy fuel oil (HFO) or diesel and an 8.7MW heavy fuel oil power plant. The estimated capital expenditure is USD22.5m including shipping, installation and commissioning, with an operating cost of USD0.15/kWh. The unit is complete with all operating and support auxiliaries required for normal operation, including cooling radiators and a climate controlled control room with paralleling switchgear, power station controls, and unit automation systems.

17.4. Esaase Project Water Supply and Management
The meteorological and hydrological studies undertaken for the 2013 PFS water management, supply and water balance designs are presented in Table 39. The water management system is divided into four categories namely, process water, potable water, sewage and storm water run-off.

The water balance model is based on a three tier approach whereby:-

       Level 1 is a closed circuit for beneficiation process water and the TSFs, with make-up water supply by pit dewatering. Both TSFs have limited water storage capacity. The maximum F-TSF storage capacity is 300,000m3 and the L-TSF storage capacity is 400,000m3 at year 12;
 
Graphic
 
 

 
 
June 2011
87

       Level 2: on site water capture and storage; and
 
       Level 3: rainfall within the mine catchment that can released to the Bonte river.
 
The lined TSF for the CIL tailings stream is to be used for temporary start up storage and a process water buffer dam have been designed to capture F-TSF decant to avoid discharge of high arsenic concentration process water to the environment under worst-case wet scenario conditions. Should water treatment ever be necessary, this would allow the treatment to be done on a reduced, but sustained process. If the open pit discharge water and run-off waters from waste rock dumps and other facilities, are less than 0.1 mg/l As these waters will only be introduced into the process circuit if there is a water shortfall. Sediment control and other controls will be undertaken outside the TSFs and outside the process circuit. For water balance modelling purposes, the overall catchment area of the L-TSF and buffer storage catchments is assumed to be 2km2 .

Make-up water sources to supplement for the losses in the water circuit include:-

       raw water from the Bonte river at the Mpatoam weir when the Bonte river is flowing sufficiently to support it. The net affect will be a prolonged period of comparatively low flow into the Bonte river downstream of Mpatoam weir;

       dewatering boreholes located in low lying areas adjacent to the Main and South Pits. Approximately 80,000 m3/m is anticipated to be delivered to the plant raw water tank for use as lime free water increasing to 140,000m3/m as the pit develops; and

       collected run-off from mine affected areas including pit dewatering, waste rock dumps, RoM and plant terraces and other "dirty" areas pumped to the plant process water dam to be routed through sediment control facilities and only introduced into the process water circuit if there is a shortfall.
 
The water balance includes the following:-

       1.4Mm3 start-up storage for commissioning in a drought, stored in the lined L-TSF and supplied from the Mpatoam weir and Bonte river in the wet season;

       300,000m3 storage capacity retained within the F-TSF;
 
       construction water will be supplied from the existing "Main" Dam situated on the edge of the proposed Main Pit;

       the process circuit will be a "no release" facility and under the wettest sequence of years modelled, the peak storage of the TFSs and buffer dam is approximately 3,0Mm3. The clay lined buffer dam is sized to contain 3,0Mm3 at full supply level and is configured as a return water dam collecting decant from the F-TSF and sized to address the driest/wettest conditions as a final point of storage to prevent discharge of contaminated process water exceeding the discharge standard. A water treatment plant may be installed to remove salts prior to discharge to the Bonte river;

       at steady state production the total water in slurry discharged to the mine residue disposal facilities will be 920m3/hr of which 60% to 90% is returned to the plant process water circuit;

       it is expected that the operations will recover make-up water from discharge from the pit, and from drainage through Mpatoam weir;

       at an arsenic threshold of 0.1mg/l, Esaase mine can release water from most mining areas (with the exception of drainage from the RoM pad) without having to deal with metals levels. Arsenic content of waters from mine affected areas are anticipated to rise from 0.04mg/l to 0.06 g/l over the LoM ;

       the mine will eventually be a net water positive situation. The average release rate over the LoM is 25l/s, but there is no release for nominally 6 months of the year, and peak release rates are as high as 800,000m3/month, or 300l/s over a month); and

       no mine closure conditions are modelled in the current water balance.
 
Potable water demand during construction and steady state production will reach a maximum of 168m3 per day to be supplied by two boreholes supplying 3l/s each. The groundwater will be stored in a potable water storage facility which will include a chlorination plant.
 
Graphic
 
 

 
 
June 2011
88
 
Sewage will be treated in vendor package treatment plants at the process plant and accommodation camp. Waste water loading will be a maximum of 160m3 per day during construction and steady state production.

17.4.1. Surface Water Management
The surface water management system for the Project will consist of two separate systems namely, a clean water diversion system to control the uncontaminated run-off from the higher lying natural environment, and a dirty storm water system to capture the contaminated storm water from plant, operational and processing areas. Water accumulated within the clean water system will discharge towards the natural watercourses. The dirty water system will be captured in process water ponds for potential reuse in the process water system.

The surface water management system will consist of open concrete lined and/or pipe systems, linked to lined and unlined dams and sediment control ponds. The system will also include diversion channels, whose function is to minimise risk to infrastructure and personnel by diverting flows away from critical points. The design elements include capacity to accommodate 1:50 24hr flood event. Road crossing for the plant access road is sized for the 1:100 year 24hour flood event whilst other road river crossings will be designed to avoid overtopping in the 1:50 year 24hour flood event. Storm water channels draining roads will be sized for a 1:10 year 24hour event and river diversions and cuttings will be designed to convey the 1:100 year 24hour event away from the open pit.
 
17.5. Tailings Storage Facility Design
The design of the mine residue disposal facilities for the 2013 PFS was undertaken by independent design specialists Epoch Resources. The design incorporated two facilities namely a storage facility for the tailings arising from the gravity-flotation circuit of the beneficiation plant (F-TSF) and the facility design to accommodate the tailings from the CIL circuits of the process plant (L-TSF). The study was undertaken to an accuracy of approximately +20%/-5% for the capital costs and an accuracy of approximately 35% for the operating costs.

The F-TSF comprises an in situ clay compacted, fully-contained, valley dam, ring-dyke facility catering for a depositional tonnage rate of 4.5Mtpa over an 11 year LoM located on the west of the Bonte river valley as illustrated in Figure 15. The costings for the F-TSF were optimised by relocation of the facility from the original location to a valley directly adjacent to the L-TSF which in the base case site plan was originally a waste rock dump site. The optimised design comprises an embankment to be constructed out of waste rock in four, phased, downstream wall raises to a maximum height of 65.0m. The F-TSF has a total footprint area of 196.2ha and a maximum elevation of 315.0mamsl. Removal of tailings supernatant water and storm water accumulating on the F-TSF is to occur through a penstock decant system to a drainage collector sump from where the water is pumped back to the plant for re-use as process water or discharged into the buffer dam.

The tailings facility for the CIL circuit comprises a high density polyethylene (HDPE) lined, fully- contained, valley dam L-TSF catering for a depositional tonnage rate of 0.5Mtpa over an 11 year LoM. The embankment is to be constructed out of waste rock in two, phased, downstream wall raises to a maximum height of 42.4m. Furthermore, a 5.0m wide compacted clay skin is to be constructed on the upstream face of the waste rock wall in order to provide a protective bedding layer for the HDPE liner. The L-TSF has a total footprint area of 49.0ha and a maximum elevation of 300.0mamsl. Since the L- TSF is to operate as a zero discharge facility, removal of tailings supernatant water and storm water accumulating on the L-TSF is to occur through a penstock decant system with all water returned back to the beneficiation plant for use as process water.
 
17.6. Roads and Buildings
The Project site is accessed by existing public roads from two directions, namely via the tarred Kumasi-Sunyani road to the north-east and the tarred Kumasi-Obuasi road to the south. Roads from both directions become gravel topped (fair to poor condition) for the last 20km. Within the project area, the existing public road is the principal transport and logistics route for light mine vehicles. Access to the plant area, the accommodation camp and construction camp is from this public road.
 
Graphic
 
 

 
 
June 2011
89
 
The plant area has a 250m long, purpose built multi-service access road corridor which crosses the Bonte river. Along with vehicular traffic, this corridor includes both RoM conveyor and pipeline servitudes. The existing main road is to be realigned along the old Bonte mining road and suitably upgraded to ensure safety and usability for locals and light mine vehicles (Figure 15). The heavy vehicle mine haul road and public road will be in close proximity with a vegetative screen to limit dust between the two roads. The re-alignment of the public road will require the upgrading of approximately 3,420m of existing Bonte mining road with a cross-section width of 7m. The haul road design for the Project is based on a cross section approximately 20m wide, (including drains and shoulders), and allows for dual lane traffic. The roads will be constructed from selected waste rock material.

The site buildings have been designed for the 2013 PFS and include prefabricated modular buildings for the main administrative buildings, clinic and training centre and accommodation.
 
18. Market Studies and Contracts
NI 43-101 Item 19
 
18.1. Market Studies
NI 43-101 Item 19
The only commodity anticipated to be produced at the proposed Esaase mine is gold, which is widely and freely traded on the international market with known and instantly accessible pricing information. The basis gold price for the 2013 PFS was USD1,400/oz which is an important factor in estimating the project Net Present Value (NPV) and Internal Rate of Return (IRR).

The USD1,400/oz price was selected during the mine design phase of the PFS when the spot gold price was in excess of USD1,600/oz with a three year trailing average of USD1,570/oz.

The forecast gold price as per the "CIBC 25 broker consensus" dated June 2013 for first two years of Esaase mine operations (2015 - 2016) are USD1,568/oz and USD1,529/oz respectively.

18.2. Material Contracts
NI 43-101 Item 19 (b)
The Ghanaian government has a standard 10% free carried interest in all permits within the country but this interest only comes into effect once exploitation and production commences. The Minerals and Mining Act 2006 also makes provision for a royalty on mining revenue which was increased in 2010 to a maximum of 5%. In addition, the mining leases contain provision for a 0.5% royalty payment to the Bonte Liquidation Committee.
 
At the current level of study no formal contracts with contractor mining companies, power supply manufacturers, equipment suppliers or civil engineering contractors have been
 
19. Environmental Studies
 
NI 43-101 Item 20
An Environmental and Social Pre Feasibility Study (Environmental and Social Report-ESR) for the Esaase Project was undertaken independently of Asanko Gold by Epoch Resources Proprietary Limited (Epoch). The results of the study were reported in a document entitled "Environmental and Social Pre-Feasibility, Esaase Gold Project, Ghana - Asanko Gold" (April 2013 Ref no. 127-038). The study was independently reviewed by Venmyn Deloitte for the NI 43-101 ITR.

The Venmyn Deloitte review examined the ESR results in the context of the specifications of Ghanaian legislative requirements, and internationally accepted standards of practice, including the Equator Principles and the International Finance Corporation (IFC) Performance Standards. The study provides the current status of environmental studies for the Project, but it is important to note that at this stage not all studies and licenses will have been completed or obtained. The environmental specialist has detailed recommendations as to specialist studies and licensing activities that will be undertaken in the near future, in accordance with the environmental licensing process in Ghana.
 
Graphic
 
 

 
 
June 2011
90
 
Environmental Due Diligence necessitates the examination of both international and in-country processes and requirements. The current environmental landscape in Ghana requires that prior to the Project advancing to development stage authorisations in terms of National Ghanaian legislation are required (see Section 19.1). In support of these authorisations, a scoping report was submitted to the Ghana Environmental Protection Agency (EPA) and upon approval, it is anticipated that the Environmental Impact Statement (EIS) report will be submitted to the EPA for approval of the scoping report in July 2013.

In addition to complying with the relevant Ghanaian laws and regulations, Asanko Gold will be guided and informed by a number of international guidelines, including the Equator Principles and the IFC Performance Standards.

19.1. Legislative Requirements
Ghanaian environmental, social and mining related legislation is applicable to the proposed Project, with the legislation and authorisations applicable to the Project listed below:

       an environmental permit through the approval of an EIS in terms of the Environmental Assessment Regulations 1999 (L.I. 1652), in compliance with the Environmental Protection Agency (EPA) Act (1994);

       a mining permit in terms of the Minerals and Mining Act (2006); and
 
       a number of water use permits in terms of the Water Resources Commission Act (1996).


19.1.1. Equator Principles
Banks in the project finance sector and the IFC have developed a common and coherent set of environmental and social policies and guidelines called the Equator Principles that are applied globally and across all industry sectors. The Equator Principles (WBG, 2006) apply to all new project financings with total project capital costs of USD10m or more. There are currently a total of 72 Equator Principles Financial Institutions (EPFI), that will only provide loans to projects where the borrower complies with these principles. Many other banks, while not signatories, use these Principles in assessing projects. The ten equator principles are as follows:-

     Principle 1: Review and Categorisation - Projects are classified according to social and environmental impacts, in Category A (significant impacts), Category B (limited impacts) and Category C (minimal or no impacts);

     Principle 2: Social and Environmental Assessment - For Category A and B projects, sponsors complete an Environmental Assessment;

     Principle 3: Applicable Social and Environmental Standards;
 
     Principle 4: Action Plan and Management System;
 
     Principle 5: Consultation and Disclosure;
 
     Principle 6: Grievance Mechanism;
 
     Principle 7: Independent Review;
 
     Principle 8: Covenants;

     Principle 9: Independent Monitoring and Reporting; and
 
     Principle 10: Equator Principle Finance Institutes (EPFI) Reporting.
 
19.1.2. IFC Performance Standards
The Esaase EIS will make reference to, and aim to comply with the applicable IFC Performance Standards and the applicable general and industry specific Environmental Health and Safety (EHS) Guidelines. The relevant IFC Performance Standards are:

     Performance Standard 1: Social and Environmental Assessment and Management System;
 
Graphic
 
 

 
 
June 2011
91
 
     Performance Standard 2: Labour and Working Conditions;
 
     Performance Standard 3: Pollution Prevention and Abatement;

     Performance Standard 4: Community Health, Safety and Security;
 
     Performance Standard 5: Land Acquisition and Involuntary Resettlement;
 
     Performance Standard 6: Biodiversity Conservation and Sustainable Natural Resource Management;

     Performance Standard 8: Cultural Heritage; and
 
     Performance Standard 7, (Indigenous Peoples) is not applicable to the project, as no indigenous people, as per the IFCs definition, occur within, or in close proximity to the project.
 
The latest versions of the World Bank Group Environmental, Health and Safety Guidelines (EHS Guidelines) have been compiled by the IFC and are applicable from 1 January 2012. The EHS Guidelines are technical reference documents with general and industry-specific examples of Good International Industry Practice (GIIP). According to IFC requirements, where Ghanaian regulations differ from the levels and measures presented in the EHS guidelines, the Esaase EIS is required to apply, whichever is more stringent. The relevant IFC Industry sector guideline relevant to Esaase Project is the Environmental Health and Safety guidelines for mining.

19.1.3. Project Categorisation
As part of the review of a projects expected environmental and social impacts, Equator Principle Finance Institutes use a system of social and environmental categorisation, based on the IFCs environmental and social screening criteria, to reflect the magnitude of environmental impacts understood as a result of assessment. These categories are:

     Category A - Projects with potentially significant adverse social, or environmental impacts that are diverse, irreversible, or unprecedented;

     Category B - Projects with potential limited adverse social, or environmental impacts that are few in number, generally site specific, largely reversible and readily addressed through mitigation measures; and

     Category C - Projects with minimal or no social or environmental impacts. Due to the anticipated irreversible impacts on the existing biophysical and social environment, the Esaase Project is classified as a Category A project.

19.2. Stakeholder Consultation
NI 43-101 Item 20 (d)
Formal consultation and stakeholder engagement regarding the Project have been on-going since 2007. Consultation and disclosure of information involved the relevant national, regional and local authorities, registered interested parties as well as directly affected individuals:-

       contact with various government ministries, departments and agencies;
 
       ongoing efforts by Asanko Gold to engage with and educate affected people in the Project area; and

       the formal ESIA Process, (including Public Hearings).

The Esaase Project implemented various engagement and consultation mechanisms through the development and implementation of a Stakeholder Engagement Action Plan, the creation of Community Liaison Committees in a number of the surrounding villages, as well as ongoing monthly meetings with surrounding communities.

Graphic
 
 

 
 
June 2011
92
 
19.3. Baseline Environment Studies
The pre-mining physical, biophysical and social environment has been characterised to, in conjunction with public consultation, identify possible environmental and social impacts that may arise due to the proposed Esaase mining project. Baseline and specialist studies have focused on the following project aspects:-

       climate and air quality; the Project area is located within the wet semi-equatorial climatic zone of Ghana, characterised by an annual double-maxima rainfall pattern. Air quality is expected to meet Ghana EPA Guidelines with the exception of particulate (dust) during the Harmattan period.
 
Motor vehicles are the primary source of dust and gaseous pollutants in the study area, but the generally low numbers of vehicles would indicate these are also a minor source of gaseous pollutants. During certain times of the year, crop field burning is a source of gaseous pollutants;

       topography and visual; the area is undulating with an elevation of 260mamsl in the lowlands. The Project site is located in the west-central portion of the Pra river basin, specifically in the headwaters of the Bonte river drainage, which flows into the Gyeni river and then the Offin river The Project area is bounded on both sides by steep hills that reach elevations of approximately 450masl;

       noise and vibration; noise generated by existing activities within the Project area exceed the daytime residential requirement of 55 dBA. At night, only the average data for Tetrem (52 dBA) exceeded the night time 48 dBA requirement;

       biodiversity (fauna, flora, and aquatic environments); the Project encompasses approximately 17,547ha of forest reserves, remnant patches of forest maintained as sacred groves, land disturbed by past mining, wetlands and surface water features, villages and hamlets (286ha), and land used as cropland. Apart from the remnant forest patches, biodiversity within the Project area has been altered by crop production, timber removal, and mining. No flora species of conservation concern were recorded within the proposed mining area but seven fauna species are protected in Ghana under the First Schedule, Ghana Wildlife Conservation Regulations (1971). Species of conservation concern identified on the IUCN Red List include: tree pangolin (Near Threatened), giant pangolin (Near Threatened), black duiker, Maxwells duiker, bay duiker, royal antelope, and red river hog (Lower Risk/Near Threatened); lesser spot-nosed monkey, and Lowes mona monkey (Lower Risk); olive colobus monkey (Near Threatened); and Geoffroys pied colobus (Vulnerable);

       Approximately 229 bird species recorded of which 120 species are "biome restricted" to the Guinea-Congo Forest of West and Central Africa and 26 "wholly protected" in Ghana under Schedule I of the Ghana Wildlife Conservation Regulations of 1971. Wholly protected species include the crowned eagle and Cassins hawk-eagle, recorded in the Gyemera and Gyeni River forest reserves; the long-tailed hawk, in the Okyem Kwaye; and the African hobby in the Prako Kwaye and surrounding area.

       hydrology and hydrogeology; the results of the surface and groundwater monitoring and sampling programme are summarised in Table 40. The EPAs standard for arsenic concentration for the discharge of effluent into the environment is 0.1 mg/l.

       heritage, cultural and archaeology; 21 sites of archaeological or heritage importance were identified within the Esaase concessions area;

       socio-economic: population within the Project area ranges from 594 residents in Manhyia to 4,793 residents in Mpatoam. The population of the entire study area is projected to be 18,711 people; including just over 14,000 in the Project area and 4,645 in the larger area of influence. Approximately 49% of the studied population is male and with 60% of the surveyed population is under the age of 26.

       The majority of household heads (89%) identified their ethnicity as Ashanti. Approximately 53 % of adults were reported to be literate
 
Graphic
 
 

 
 
June 2011
93
 
The main land uses in the area include subsistence farming, settlements, small scale and non-permitted mining, infrastructure and community graveyards. The main economic activity in the Study Area is cocoa production followed by galamsey and trading. Two- thirds of all households use electricity as their main source of lighting, while one-third use kerosene or battery-operated/rechargeable lanterns. Access to drinking water from an improved source (i.e., private or public tap/borehole) was available for all households surveyed.


Table 40 : Hydrological and Hydrogeological Study Results
 
PARAMETER
UNIT
VALUE
 
Surface Water
 
Electricity conductivity
milliSiemens per cm (mS/cm)
0.16
Mean Total dissolved solids-Bonte River
TDS mg/L
200
Mean Total dissolved solids-Offin River
TDS mg/L
145
Mean pH
 
7.3
Mean alkalinity
mg/L
60
Mean sulphate
mg/L
5
Range sulphate
mg/L
1 to 70
Mean chloride
mg/L
13
Turbidity
TSS total suspended sediment mg/L
1 to 30,000
Turbidity
NTU nephelometric turbidity units
2 to >999
Median turbidity
TSS total suspended sediment mg/L
25
Arsenic-Bonte River
mg/L
<0.001 to 0.007
Arsenic-Offin River
mg/L
<0.001 to 0.002
 
Ground Water
 
Ground water follows topography
   
Total coliforms and ecoli
CFU/100mL
2,420 and 360
Coliforms and ecoli (see legend below)
present in X of XX boreholes
in 12 of 63 MW; 39 of 197 HP; 18 of 21
   
CBh
   
0.147 in MWs, 0.429 in CBhs and 0.213 in
Electricity conductivity
milliSiemens per cm (mS/cm)
HPs
Mean pH
 
7.0 for MW and CBh ; 6.0 for HB
Total dissolved solids
TDS mg/L
254 in MW; 297 in CBhs; 196 in HP
Mean alkalinity
mg/L
184 in MW; 160 in CBhs; 90 in HP
Mean sulphate
mg/L
10 to 18
Mean chloride
mg/L
14 to 26
Mean arsenic
mg/L
0.68 to 0.80 for MW; 0.10 to 0.010 for
   
CBhs; 0.004 HP
   
0.598 for MW; 0.043 for CBhs; 0.041 for
Max arsenic
mg/L
HP
Source : Epoch 2013
MW - monitoring wells
CBh - community borehole
HP - hand-pump wells
 

19.4. Key Environmental Risks Identified and Mitigation
Various potential positive and negative environmental impacts have been identified that will need to be assessed during the Environmental Impact Assessment (EIA) process. The following key risks have been identified:-

       the potential impacts on both the quality and quantity of surface and ground water due to construction, operational and post mining activities;

       community health and safety due to an anticipated increase in traffic on the existing road network, blasting activities and the proximity of various communities to the proposed mining area;

       noise and lighting impacts on nearby communities due to construction and operational mining operations;

       the impact of increased levels of dust on communities due to opencast mining, haul roads, blasting and an increase in traffic;

       community health and safety, air quality and noise related impacts associated with the construction of deflection berms associated with the mine residue disposal facilities;
 
Graphic
 
 

 
 
June 2011
94
 
       negative impacts of a potential influx of people from outside the Project area on the health and safety of the current social environment, as well as the additional pressure on existing social and service
infrastructure within the Project area; and

       livelihood compensation and restoration due to various fields and crops being located within the proposed mining area.


19.5. Mine Closure
A conceptual Rehabilitation and Closure Plan for the proposed Esaase mine and its associated infrastructure was undertaken by DRAM for the 2013 PFS. An estimate of the required financial provision to ensure that the plan can be implemented was required and the information used in the formulation of the conceptual closure and costs was sourced from the ESR and also the PFS design of the mine and associated infrastructure.

In the planning and implementation stages of a mining project the focus of rehabilitation and closure planning is to ensure that:-

       the proposed post closure land use(s) for the site are defined and agreed with the regulatory authorities;

       the nature, scale and cost of the works required to return the site to a condition consistent with the requirements of the post closure land use(s) are defined and understood;

       the necessary financial provisions are made for closure of the mine and that these are included in the assessment of the project viability;

       a plan is developed for the implementation of the rehabilitation and closure works so as to ensure that the process proceeds concurrently with mining operations as far as possible; and

       the build-up in rehabilitation and closure liabilities is limited so as to mitigate as far as possible the impacts of premature, or unplanned closure.
 
The proposed Esaase mine will comprise a conventional open pit operation with a LoM of approximately 11 years. The objective of the rehabilitation closure process is to restore as much as possible of the area disturbed during the operation of the mine to a land use as close as possible to that previously practiced before mining operations. Natural soil covers and vegetation will as far as possible be re-established over these areas but access by humans and/or livestock will be discouraged due to potential health and safety concerns. Examples of possible exclusion zones would include the high wall of the final void of the open pit and the final void itself. Rehabilitation and closure of areas disturbed in mining and related operations will be considered to be complete when:-

       all structures, equipment and infrastructure not consistent with the post closure land use have been decommissioned, demolished and removed from site;

       ownership of all remaining infrastructure and services required to support the proposed post closure land use have been formally transferred to the local authority responsible for the administration of the area;

       the area has been made safe for all post closure land users and livestock;
 
       all surface disturbances and remaining landforms are structurally and ecologically stable and have sustainable soil and vegetation covers;

       surface water management structures are in place and are free of damage due to erosion; and

       all surface and groundwater discharges from the site satisfy agreed target water quality objectives.
 
The conceptual rehabilitation and closure plan and associated estimate of closure costs for the mine has been formulated to ensure that the completion criteria as defined above are achieved.
 
 
Graphic
 
 

 
 
June 2011
95
 
The estimated costs of rehabilitation and closure presented in Table 41 have been structured so as to distinguish between concurrent rehabilitation of the mine and the works required at closure. The cost of rehabilitation for the North Pit, has been excluded.
 
Table 41 : Mine Closure and Rehabilitation Estimated Costs
 
PROJECT COMPONENT
PROGRESSIVE
DECOMMISSIONING
REHABILITATION
AFTERCARE AND TOTAL
       
MAINTENANCE
(USD)
CIL plant
 
719,177
415,467
27,698
1,162,342
Main Pit
664,176
350,000
167,015
11,264
1,192,455
South Pit
1,046,262
300,000
253,433
14,090
1,613,785
Waste Dump
3,913,093
 
1,272,311
91,553
5,276,957
Waste dump
1,841,642
 
621,122
45,259
2,508,023
Flotation TSF
1,038,960
517,901
4,041,102
253,682
5,851,645
L-TSF
205,864
228,699
1,397,059
87,414
1,919,036
Sub-total
8,709,997
2,115,777
8,167,509
530,960
19,524,243
Contingency 10%
       
1,952,424
Contractors preliminary costs 30%
       
6,443,000
Permitting and Management 7.5%
       
2,093,975
TOTAL
       
29,57,000*
Source : Epoch 2013
*Computation inconsistency due to rounding
 
20. Capital and Operating Costs
NI 43-101 Item 21
 
20.1. Capital Expenditure
The Esaase Project capital expenditure (capex) estimation is derived from the studies on mining, processing, mine infrastructure, TSF designs, dam construction, electrical supply, owners costs and indirect costs. The capital costs for the mining operation, process plant and TSFs are provided in Sections 20.1.2, Section 20.1.3 and Section 20.1.3 respectively. The summary capital cost estimates provided in Table 42 apply to initial capital requirements only and the following are excluded (Table 42):-

       escalation;
 
       operating costs;
 
       replacement capital;
 
       stay in business capital;
 
       closure costs; and
 
       taxes, tariffs and duties.
 
The general estimation approach was to measure/quantify each cost element from the engineering drawings, Process Feed Diagrams, mechanical equipment list, infrastructure equipment list, and motor lists. Quotations from 3, or more vendors were obtained for the major equipment whereas minor equipment, in general, was single sourced. The estimate for the plant has been based on an assumption of a continuous engineering, procurement and construction effort with no interruption of the implementation programme after funding approval has been obtained. The estimate is based on a project execution strategy whereby major units of construction work will be allocated to a number of contractors. The preliminary and general (P&G) estimates for earthworks, dam construction, mining, and steel construction have been allocated between 0% and 40%. The cost estimates assume that all material and equipment acquisition and installation sub-contracts will be competitively tendered and no allowance for delays is included.
 
Graphic
 
 

 
 
June 2011
96
 
Table 42 : Initial Esaase Project Capital Expenditure Estimates as at March 2013
 
PROJECT COMPONENT
DETAILED COMPONENT
COST
COMMENT
   
(USDm)
 
 
Capital costs
82.90
 
Plant
EPCM
10.30
 
 
Sub-total
93.20
 
 
Mining
13.70
Mobilisation top soil stripping Year 1 only
 
Alternative Power Supply
22.50
Heavy Fuel Oil (HFO) power plant
 
MV Reticulation
8.70
Excluding plant
 
Float TSF
14.10
1st lift
Infrastructure
Cyanide TSF
12.60
1st lift incl. HDPE liner
 
Contractors Camp
9.20
600 people including contractor camp/terrace
 
General
15.40
Earthworks, buildings, roads, store, water
 
P & G‟s
14.80
 
 
Sub-total
111.00
 
 
Allowance for potential crop compensation
17.00
 
 
Provision for community disruption
12.00
 
 
Social responsibility
1.00
 
 
Owners costs
9.50
 
Indirect costs
     
 
Consumables
3.00
 
 
Balance of EPCM
10.30
 
 
General
3.50
Spares, Vehicles
 
Sub-total
56.30
 
Sub-total
 
260.50
 
Contingency
 
26.00
 
TOTAL
 
286.50
 
Source : DRA 2013 and numerous specialist studies


An estimate of the additional capex required over the LoM is USD95.2m and includes additional stage lifts to the mine residue disposal facilities, buffer dam construction, top soil stripping, secondary crusher and mine rehabilitation and closure. The total Project capex over the LoM is estimated to be USD381,7m.
 
20.1.1. Mining Capital Expenditure Estimate
The DRAM 2013 mining study provided the capital estimates for the mining operation at the proposed Esaase mine. The estimate includes mobilisation and site establishment, topsoil stripping and site clearing and demobilisation. The pre-production including mobilisation and establishment, and topsoil stripping is estimated at USD13.70m. In Year 12 a demobilisation cost of USD0.125m is allocated to the mining capex.
 
20.1.2. Process Plant Capital Expenditure
A summary of the capital expenditure on the process plant is presented in Table 43:-
 
Table 43 : Process Plant Capex
 
PLANT CONSTRUCTION
COST (USD)
Earthworks and general
4.80
Civils
5.90
Structural steel and platework
14.40
Mechanicals
35.80
Piping and valves
5.20
Electrical and instrumentation
12.80
Transportation
4.00
Sub-total
82.90
EPCM
10.30
TOTAL
93.20
Source : DRA 2013 and numerous specialist studies
 
Graphic
 
 

 
June 2011
97
 
20.1.3. Mine Residue Disposal Facilities Capital Expenditure
The initial optimised capital costs for the mine residue disposal facilities are estimated at USD34.63m. In addition the on-going capital costs are USD44.23, resulting in a total LoM capital expenditure of USD78.86m. The pre-optimisation total capex was USD86.98m and the optimised operating costs are USD1.17m/a.

20.2. Operational Expenditure
Operating cost (opex) estimates were developed from each of the Project component studies and include mine design criteria, process flow sheet, plant consumable studies, mass and water balance, mechanical and electrical equipment lists, and in-country labour cost data. The cash operating costs are defined as the direct operating costs including contract mining, processing, tailings storage, water treatment, general and administrative and refining costs. Opex estimates for the mining operation and process plant are presented in Sections 20.2.1 and Section 20.2.2 respectively.The average LoM cash operating cost is estimated at USD736/oz Au based on the treatment of 5Mtpa producing an average of 200,000oz/a.
Table 44 : Operating Cost Estimates Esaase Project as at June 2013
 
PROJECT COMPONENT DESCRIPTION
OPEX (USD/oz Au)
OPEX (USD/tonne milled)
Waste mining
300.26
12.24*
Ore mining
113.84
4.64
Processing
254.19
10.37
General and administrative
62.14
2.53
Refining
5.35
0.22
Total cash operating costs
735.78
30.00
Royalties
77
3.14
Total cash costs
812.78
33.14
Sustaining and deferred capex
30.36
1.24
Pre-tax sustaining cash cost
843.14
34.38
Taxation
146.71
5.99
Post tax inclusive sustaining cash cost
989.85
40.37
Source : DRA 2013
*Applying the LoM stripping ratio of 4.28
 
20.2.1. Mining Operational Expenditure
Asanko Gold selected to conduct the PFS on a base case utilising contract mining as opposed to owner operations. DRA obtained four independent contract mining company quotations for the 2011 PFS which were escalated for inflation to 2013 and normalised for comparative purposes. The average mining cost obtained from the quotations was USD3.55/t and ranged USD3.39/t to USD3.70/t.
 
An initial conceptual Project mining opex figure of USD3.23/t was obtained by combining DRAs database of costs, for similar operations and average costs from the quotations obtained. Mobilisation, site establishment, demobilisation, clearing and topsoil stripping costs formed part of capital expenditure and thus, not part of operational expenditure. As the PFS progressed and more detail became available, the opex was optimised and refined but these optimisations will be included in the DFS. The optimisations included repositioning of the RoM pad and waste dumps, and refined reference bench costs.

The final mining opex over the LoM is summarised in Table 45:-
 
Table 45 : LoM Mining Operational Expenditure
 
 
ORE
WASTE
Tonnage (Mt)
52.34
224.25
Total costs (USDm)
243.09
641.16
LoM costs (USD/t)
2.86
4.64
Source : DRA 2013

20.2.2. Process Operating Costs
The opex for the processing plant is summarised in Table 46:-
 
 
Graphic
 
 

 
 
June 2011
98
 
Table 46 : Process Plant Operating Costs
 
 
FIXED COSTS (LoM Blend)
VARIABLE COSTS (LoM Blend)
TOTAL PROCESSING COST
 
(USD)
(USD/t)
(USD)
(USD/t)
(USD)
(USD/t)
Labour
31,548,297
0.60
0.00
0.00
31,548,297
0.60
Laboratory
5,606,201
0.11
1,889,334
0.04
7,495,535
0.14
Consumables
   
272,834,578
5.21
272,834,578
5.21
Power
   
199,087,726
3.80
199,087,726
3.80
Maintenance
   
22,662,541
0.43
22,662,541
0.43
Tailings
   
9,900,000
0.19
9,900,000
0.19
TOTAL
37,154,498
0.71
506,374,179
9.67
543,528,677
10.37
Source : DRA 2013
 
21. Economic Analysis
NI 43-101 Item 24
Venmyn Deloitte constructed a Discounted Cash Flow (DCF) model for the purposes of the economic analysis of the Esaase Project. The DCF model was constructed in Excel and was based on input assumptions generated from the 2013 PFS mining schedule, processing schedule, operating costs and capital expenditure estimates. Venmyn Deloitte received input from DRA and Asanko Gold on the timing of the various inputs, including working capital requirements. The DCF model assesses the post-tax real cash flows for the Project.

21.1. DCF Model In-put Parameters
The main economic, production and processing assumptions made in the construction of the DCF model, are summarised in Table 47 and are discussed in more detail in Section 20. The DCF model assumes that both revenue and expenses, as well as royalty and taxes, are incurred in USD, therefore, no exchange rate assumptions are necessary. The 2013 PFS was undertaken at a gold price of USD1,400/oz and Venmyn Deloitte assumed this flat rate for all future revenue streams. The selected USD1,400/oz gold price is below the current 3 year average gold price of USD1,551/oz.

For the purposes of the economic analysis, Venmyn Deloitte used a discount rate of 5%. However, in the sensitivity analysis, the results are reported over a range of discount rates (Table 48).

Table 47 : DCF Economic In-put Parameters (Source : Venmyn Deloitte 2013)
 
DCF MODEL IN-PUT PARAMETER
UNIT
VALUE
  Economic  
Corporate Tax Rate
%
35.00
Royalties Rate
%
5.50
Real Discount Rate
%
5.00
Gold Price
(USD/oz)
1,400
Realisation Cost
(USD/oz)
5.35
Payback Period (from production to
(Years)
3
capital payback)
   
Production  
Total Ore Tonnes Mined
(Mt)
52.34
Stripping ratio
waste:ore
4.28:1
Average Grade
(g/t)
1.41
Life of Mine
(Years)
11
Gold Recoveries
(%)
90
Total Gold Recovered
(Moz)
2.14
Opex  
Ore Mining Cost
(USD/tonne
4.64
 
mined)
 
 
(USD/tonne
 
Waste Mining Cost
 
2.86
 
mined)
 
 
(USD/tonne
 
Processing Cost
 
10.37
 
milled)
 
 
(USD/tonne
 
General and Administration
 
2.53
 
milled)
 
Capex  
Initial Capex
(USDm)
260.50
Sustaining Capex
(USDm)
51.90
Deferred Capex
(USDm)
12.95
Closure Capex
(USDm)
29,60
Capex Contingency
(%)
10
 
Graphic
 
 

 
 
June 2011
99
 
21.2. DCF Model Results and Sensitivities
At a discount rate of 5%, the economic analysis indicates a positive Net Present Value (NPV) of the Esaase Project of USD354.7m. A range of project NPVs at various gold prices and discount rates is presented in Table 48:-

 Table 48 : Economic Analysis of the Esaase Project at Various Discount Rates and Gold Prices
 
PRICE
         
IRR
(USD/oz)
PROJECT NPV (USDm) at various discount rates (%)
  (%)
 
3%
5%
6%
7%
8%
 
1,100
95.07
50.75
31.24
13.29
-3.27
7.8
1,200
209.73
155.14
131.03
108.77
88.20
13.4
1,300
321.08
255.51
226.50
199.70
174.91
18.5
1,400
431.50
354.71
320.71
289.27
260.17
23.2
1,500
541.65
453.58
414.55
378.45
345.02
27.6
1,600
651.61
552.19
508.10
467.31
429.53
31.7
1,700
761.53
650.77
601.62
556.15
514.01
35.8
 
Venmyn Deloitte investigated the sensitivity of the project NPV to different input parameters (Figure 17). The NPV generated from the DCF model proved to be most sensitive to changes in parameters affecting revenue. A 10% change in revenue changes the NPV by 39.1%. The NPV is less sensitive to changes in operating expenditure (opex) with a 10% change in opex translating into a 21.9% change in the NPV. A 10% change in capital expenditure changes the NPV by 17.4% as illustrated in Figure 17.
 
At a 5% discount rate and all else being equal, the critical gold price which generates an NPV of 0 is USD1,049/oz. The gold price which generates an NPV of 0 at differential discount rates is shown in Table 49:-

Table 49 : Critical Gold Price at which NPV=0
 
DISCOUNT
GOLD PRICE AT WHICH NPV=0
RATE (%)
(USD/oz Au)
5.00%
1,048.66
7.50%
1,091.13
10.00%
1,134.78
12.50%
1,179.64
Source : Venmyn Deloitte 2013

21.3. Conclusions from the Economic Analysis
 
Based on the forgoing economic analysis, Venmyn Deloitte concludes the following:-

       based on a 5% discount rate, the NPV of the Project is USD354.7m; and
 
       the Project is sensitive to changes in revenue with a 10% change in operating income resulting in a 39.1% change in the NPV.
 
22. Adjacent Properties
NI 43-101 Item 23 (a), (b), (c), (d)
The Esaase Project is located within the northern Asankrangwa belt, approximately 20km north-northwest of PMI Gold Corporations Abore North deposit, located on the southern strike direction of the Kaniago West- Esaase Shear Zone. A series of parallel shears host numerous gold exploration projects in the region.

The Esaase Project is bounded in the north by forest reserve and in the west by African Gold Group Incorporateds Assuowunu exploration project. The exploration of the Assuowunu project has comprised soil sampling and airborne geophysical surveys. The initial results defined four anomalous zones in the silt sampling programme and the soil sampling program defined five gold-in-soil anomalous zones. A public domain map of the project (www.africangold.com) suggests a drillhole intersection of 1.2g/t over 8m width was obtained west of the defined Esaase Mineral Resource area.

Graphic
 
 

 
 
Graphic

 
 
 

 
 
June 2011
101
 
The southern boundary of the Esaase Project coincides with the Abore North exploration project which forms part of PMI Gold Corporations Asanko Gold exploration project (www.PMIgoldcorp.com). Drilling has been undertaken but not reported in the public domain. Almost 20km directly south of Esaase Project on the Kampeses-Nkran- Asuadai Shear Zone is the PMI Gold 100,000oz Asuadai deposit and 3.52Moz Nkran deposit. The Nkran deposit comprises three vertical, parallel mineralised zones below a previously mined open pit. The deposit is 500m in strike length with mineralisation over a 100m width to at least 250m depths. A Mineral Reserve of 34.2Mt at a grade of 2.2g/t for 2.4Moz contained gold was announced in 2012. Mine construction is due to commence in 2013 with first production in 2014.

Further southwest, on the Kaniago West- Esaase Shear Zone, the Midlands Minerals Corporation (www.midlandsminerals.com) holds exploration licences over the Mmooho and Kaniago West deposits.

The information supplied in this section has been obtained from the public domain and therefore has not been verified. The information is not necessarily indicative of the mineralisation on the Esaase Project.
 
23. Other Relevant Information
NI 43-101 Item 24
23.1. Risk Assessment
The Esaase Project risk assessment was undertaken by DRA, all the contributing specialist consultants and engineers and Asanko Gold. The risk assessment was based on the DRA Risk Management Framework and Criteria which is based on the International Risk Management Standard ISO 31000, as well as the Australian Standard AS/NZS 4360. The objective was to involve all project contributors to identify risks appropriate to the Project at this stage, to determine a risk profile for the Project moving into the following stage and assist in making key decisions, identify any risk that could significantly impact on the successful delivery of the project and develop a risk control strategy and plan to manage the identified risks.

The risk analysis criteria used are presented in Table 50 and the results of the analysis identified 83 risks, of which 2 are extremely high, 44 high, 31 moderate and 6 low to very low. At the current project study stage these risks are without mitigating controls but with such controls identified in the DFS stage, the risks are likely to be reduced. The two extremely high risks relate to the haul roads cross over public roads on level crossings where there is a serious risk of accidents and increased project traffic on the public roads during construction. These risks will require appropriate controls in order to decrease them to appropriate levels.

23.2. Project Execution Plan
The 2013 PFS included a full project execution plan which will be undertaken and managed by DRA. The execution plan in included the following aspects at PFS level of accuracy; procurement strategy; assessment of required contracts; organisation and staffing requirements; engineering and design; construction management; health and safety; quality controls and assurance; project accounting; software and hardware systems; change and risk management; commissioning; testing and handover.

The Project Execution Plan entails orders for long-lead-time item and early contracts to be placed in September 2013 contingent on receipt of necessary permits and authorisations. Front-end engineering and early work on site is scheduled for the start of the dry-season in November 2013 and main construction is planned to begin in March 2014. Commissioning is planned for May 2015.
 
Graphic
 
 

 
 
June 2011
102

Table 50 : Risk Evaluation Criteria
 
PROBABILITY-
             
LIKELIHOOD
RISK CLASSIFICATION (as per Legend below)
More than once a
Inevitable
6
6 - Moderate
12 - High
18 - High
24 - Extremely High
30 - Extremely High
day
             
Every day
Almost certain
5
5 - Low
10 - Moderate
15 - High
20 - High
25 - Extremely High
Once a month
Likely
4
4 - Low
8 - Moderate
12 - High
16 - High
20 - High
Once a quarter
Possible
3
3 - Low
6 - Moderate
9 - Moderate
12 - High
15 - High
Once a year
Unlikely
2
2 - Very Low
4 - Low
6 - Moderate
8 - Moderate
10 - Moderate
Once every ten
             
years
Rare
1
1 - Very Low
2 - Very Low
3 - Low
4 - Low
5 - Low
               
  Impact/Consequences
Description
   
1
2
3
4
5
     
Insignificant
Minor
Moderate
Major
Catastrophic
               
Impact on the Health and Safety of Personnel
First-Aid case / Exposure to
Medical Treatment case / Exposure
Lost time injury / Reversible
Single fatality or loss of quality of
Multiple fatalities / Impact on
 
minor health risk
to major health risk
impact on health
life / Irreversible impact on health
health ultimately fatal
Environmental Impact
   
Minimal environmental harm -
Material environmental harm -
Serious environmental harm -
Major environmental harm -
Extreme environmental harm -
     
Remediable within same shift
remediable over short term
remediable within LoM
remediable post LoM
Incident irreversible
        < 3 months      
               
       
May result in overall project
May result in overall project
May result in overall project
May result in overall project
     
Less than 1% impact on the
budget overrun equal to or more
budget overrun of equal
budget overrun of equal to or budget overrun of 50%
Financial Impact/ Property Damage
  budget of the project
than 1% and less than 5%
to or more than 5% and
more than 20% and less than
or more
         
less than 20%
 50%  
             
 
     
No disruption to operation
Brief disruption on operation
Partial shutdown between 5 and
Partial Loss of operation
Substantial or total loss of
      less than 1% impact on
between 1 and 5%
20% impact on overall project Between 20 and 50% impact on operation over 50% impact on
Business Interruption
   
overall project timeline
impact on overall project timeline
timeline
overall project timeline
overall project timeline
             
 
         
Serious breach of law;
Major breach of the law;
Very considerable penalties
       
Minor legal issues; non-compliance
investigation/report to authority;
considerable prosecution and & prosecutions. Multiple
Legal & Regulatory
   
Low level legal issues
and breaches of law prosecution and/or moderate
penalties
law suits & jail terms.
         
penalty possible
 
 
               
     
Slight impact - public
 
Considerable impact - regional
National impact - national
International impact -
Impact on Reputation / Social / Community
 
awareness may exist but no
Limited impact - local public concern
public concern public concern international public attention
     
public concern
     
 
 
Extremely High
Cease activity immediately until the residual risk is reduced to an acceptable level
High
Eliminate, avoid, implement specific action plans/procedures to manage & monitor daily
Moderate
Proactively manage & monitor weekly
Low
Actively manage & monitor monthly
Very Low
Continue and monitor identified risk & monitor monthly
 
Graphic
 
 

 
 
June 2011
103

24. Summary, Interpretations and Conclusions
NI 43-101 Item 24
The results of specialist studies conducted for the 2013 PFS on the Esaase Project have been reviewed by Venmyn Deloitte and incorporated into an economic analysis of the Project. The following summary, conclusions
and interpretations were highlighted in the review:-

       the Esaase Project is located in southwest Ghana in West Africa within the Amansie West District of the Ashanti Region, approximately 35km southwest of the regional capital Kumasi;

       the Esaase Project comprises two contiguous mining leases and four prospecting licences that cumulatively cover an area of approximately 99.10km2 in the prospective gold mining Ashanti region. The Esaase and Jeni concessions contain alluvial gold deposits in the Bonte river valley which have been exploited historically by artisanal miners. The Esaase Project however, is focussed on the primary host Birimian aged meta-sediments and not on evaluation of the alluvial deposits;

       the Jeni River and Esaase mining leases were originally granted in March 1990 to the Jeni River Development Company Limited and to Bonte Gold Mines Limited respectively. Both of these companies filed for bankruptcy in 2002 and the Esaase mining lease was acquired from the Bonte Liquidation Committee by Sametro Company Limited, a private Ghanaian company. Asanko Gold entered into an agreement with Sametro in May 2006 to earn 100% of the mineral right and transfer of the Esaase mining lease to Asanko Gold was completed in June 2007;

       the mining leases are valid until 2020 and can be renewed for an additional thirty year period. The mining leases permit Asanko Gold to undertake mining activities provided certain conditions and fee payments are maintained with the Ministry of Lands, Forestry and Mines;

       the Esaase Project is located in the Archaean (Birimian 2.17Ga) aged Asankrangwa Belt within the Kumasi Basin. World renowned gold mines such as AngloGold Ashanti Limiteds Obuasi deposit, which began production in 1898, are located in the neighbouring Ashanti and Sefwi greenstone belts. Similar vein deposits in the region, such as Prestea and Konongo have robust production histories. The gold quartz vein mineralisation in these deposits is exclusively structurally controlled along faults and shear zones resulting from compressional tectonic episodes, particularly along the margins of greenstone belts such as the Ashanti and Sefwi Belts;

       the target Esaase Project mineralisation is classified as a mesothermal orogenic quartz vein deposit. Such mesothermal orogenic deposits are associated with Precambrian and Phanerozoic convergent plate boundaries and are hosted in sequences generally metamorphosed to greenschist facies.
 
The Esaase Project area comprises a sequence of intensely folded and faulted meta-sediments and the mineralisation comprises a system of gold-bearing quartz veins hosted by the tightly folded meta-sediments. The mineralisation is considered to have been produced by a series of fluid influxes which were channelled along lithological, rheological and structural boundaries. The target gold mineralisation occurs in association with quartz-carbonate-sulphide veins hosted within parallel, northeast trending, moderately to steeply, west dipping units of extremely deformed siltstone/shale;

       the Esaase Project mineralisation is structurally controlled by Eburnean age compressional tectonic events which produced fold-thrust patterning followed by a late stage strike-slip deformation event. The deformational intensity increases systematically from the northwest to the southeast across the Project area. The regional structural synthesis suggests that most of the structural elements are compatible with a single, extended and progressive phase of regional deformation involving substantial northwest-southeast compression. Towards the close of the tectonic event, the stress direction changed from northeast-southwest to north-south. The change in stress direction caused left lateral strike-slip movement along pre-existing faults which created a northsouth dilational opening permitting the emplacement of late stage non-mineralised northsouth oriented veins;

       the Esaase Project mineralisation is characterised by free-gold and very fine gold in association with sulphides;
 
Graphic
 
 

 
 
June 2011
104
 
       the weathering profile on the Esaase Property is strongly influenced by topography and influences the proposed mine site layout and mining methodology. The weathered profile comprises surface laterite and ferruginous duricrust followed by saprolite, which gradationally merges with oxidised bedrock. In regions of higher elevation at Esaase Project, the laterite and underlying saprolite are removed by erosional processes and only the oxidised bedrock remains;
 
       since mid-2006, Keegan Resources has undertaken an extensive exploration programme combining soil geochemistry and IP and VTEM geophysical surveys, followed by diamond and reverse circulation exploration and resource drilling. The geophysical surveys delineated the resistivity of the host and bedrock at Esaase Project and the >6,100 soil sample geochemistry programme clearly supports the mineralisation model of parallel northwest trending mineralised structures;
 
       the drilling programme conducted at the Esaase Project focused mainly on the northwest striking gold bearing structures and a total of 1,496 RC and diamond drillholes were completed on the Project area. A geotechnical drilling programme of 28 diamond drillholes was also completed. Sample recovery was good except in the moderate to highly weathered saprolite and highly fractured and brecciated zones where poor recoveries were experienced. Recovery factors are unlikely to materially affect the accuracy and reliability of the sampling results. Quality control, twin drillhole verification showed no negative bias in the diamond drilling due to the use of water. Reviews of the drilling and sampling protocols by independent Qualified Persons from Coffey Mining and Minxcon provide confidence that the data is spatially well represented and that the methodologies employed are within international standards and the resultant information is suitable for Mineral resource estimation purposes;
 
       suitable specific gravity measurements were undertaken to support the Mineral Resource estimation process;
 
       sample preparation and analysis was undertaken in three independent internationally accredited laboratories and two umpire laboratories. Field Quality Assurance/Quality Control measures included insertion of CRM standards to monitor accuracy, blank samples to identify contamination, duplicate samples to check precision and submission to umpire laboratory. Each laboratory included in-house reference standards duplicates and blanks and the sample preparation and analytical techniques employed for the Esaase sampling campaign are appropriate for the style of mineralisation. Detailed analysis of the quality control data was undertaken by Coffey Mining and Minxcon with the concluding opinion that the Esaase Project quality control and assurance is adequate but suggests a relative high bias in Transworld Laboratories data and a lack of precision between laboratories which should be investigated;
 
       the 2011 Coffey Mining PFS for the Esaase Project was based on an open pit mining methodology with an associated "whole-ore" leach processing plant. The study included initial mill throughputs of 9Mtpa reducing to 7.5Mtpa once mining of the fresh zone began. The PFS resulted in a positive NPV for the Project but additional studies indicated that better economic outcomes could be achieved with alternative process design methodologies and consequently the 2013 PFS was initiated with a revised scope which included investigation of a conventional crushing, milling, gravity recovery plant followed by flotation, with the flotation concentrate being reground and then leached in a standard CIL circuit using AARL elution technology;
 
       under the supervision of Lycopodium in Australia four extensive phases of metallurgical testwork were completed for the 2011 PFS and DRA undertook a Phase V testwork programme in 2012 to support the new process design. The final process recommended by DRA comprises SAG milling, with primary gravity recovery from the mill circuit, flotation of the milled product, with regrind and secondary gravity recovery of the flotation concentrate ahead of CIL gold recovery of the reground flotation concentrate. Testwork results indicated an optimal grind size of 75µm with a LoM recovery of 90.06% which includes a 1.09% recovery discount to allow for practical processing limitations in a full-scale operating plant environment. The final design has the benefit that the flotation tailings, comprising approximately 85% to 90% of the feed, are benign and can be disposed to a non-HDPE lined waste TSF, whilst the CIL and downstream plants can be downsized accordingly;
 
 
Graphic
 
 

 
 
June 2011
105
 
       the metallurgical testwork and process design criteria were independently reviewed by Venmyn Deloitte and Venmyn Deloitte is of the opinion that the metallurgical testwork is acceptable for the type and style of mineralisation and that the process design is reasonable with potential for additional optimisation for later study stages;
 
       Minxcon conducted the 2013 PFS Mineral Resource estimate on a refined block model utilising existing data with an additional 19,598 assay results to more precisely delineate the mineralised zones within the resource area. Grade estimation was undertaken using Ordinary Kriging, with Indicator Kriging chosen to delineate the areas with continuous grade. Mineralised domains were defined and modelled on an approximate lower cut-off grade of 0.3g/t. A total of 46 zones, including waste, were identified and included in the statistical analysis and resource estimation. Outlier analysis and variogram determinations were undertaken and the final Mineral Resource estimate at a 0.6g/t cut-off grade is:-
 
       Measured Mineral Resources of 23.4Mt at a grade of 1.49g/t Au for 1.12Moz contained gold;

       Indicated Mineral Resources of 71.3Mt at a grade of 1.44g/t Au for 3.29Moz contained gold;

       Total Measured plus Indicated Mineral Resources of 94.6Mt at a grade of 1.45g/t Au for 4.41Moz contained gold; and

       Inferred Mineral Resources of 33.6Mt at a grade of 1.40g/t Au for 1.51Moz contained gold.
 
       the Mineral Reserve estimate was based on the 2013 PFS mining study at a cut-off grade of 0.6g/t Au, a USD1,400/oz gold price and a mining recovery of 97%. Gold resources which occur in satellite pits and which are currently deemed uneconomic to extract were excluded from the Mineral Reserve estimate, together with Mineral Resources which are affected by permitting, environmental, logistic and socio-political issues such as proximity to villages or forest reserves. The 2013 PFS Mineral Reserve estimate is


       Proven Mineral Reserves of 22.9Mt at a grade of 1.43g/t Au for 1.05Moz contained gold; and

       Probable Mineral Reserves of 29.5Mt at 1.40g/t Au for 1.32Moz contained gold.
 
       Total Proven and Probable Reserves of 52.34Mt at a grade of 1.41g/t Au for 2.37Moz contained gold.

       DRA Mining undertook the mining study for the 2013 PFS, which included mine design on Indicated and Measured Mineral Resources only, pit optimisation, mine production and scheduling and costing. The appropriate mining methodology for the Esaase Project comprises conventional open pit drill and blast mining, followed by load and haul to various stockpiles. The drilling and blasting would be performed on benches between 10m and 20m in height and total material movement over the 11 year LoM is estimated between 30Mtpa and 35Mtpa. For the purpose of the 2013 PFS, Asanko Gold opted for the mining study to be conducted on a contract mining basis. Geotechnical studies confirmed slope angles of 52° in fresh material and 35 in oxide material. Pit optimisation produced a main pit with various satellite pits but only the Main Pit and South Pit were included in the mining study. The selected pit shell reaches a depth of - 19mamsl, or approximately 290m below the Bonte river valley surface and contains 52.34Mt of mill feed at 1.4g/t Au for 2,37Moz of in situ gold. A total of 224.3Mt of waste are contained within the pit, equating to a waste to ore stripping ratio of 4.28. A pit dewatering programme has been designed and grade control planning is essential. Bench and face mapping, for grade control as well as for geotechnical reasons, will be a routine task in finalising the ore and waste blocks to be marked out for excavation;
 
       the mine plan includes pre-production stripping and waste provision for starter dams. Thereafter, the Main Pit remains the principal source of RoM, with South Pit contributing, on average, a third (±31%) of the overall tonnes mined for the first four years until its mined out and ready to be backfilled;
 
Graphic
 
 

 
 
June 2011
106
 
       the mine site plan was optimised during the 2013 PFS and the final plan includes various waste dumps, two TSFs located in a valley to the west of the Main Pit, a plant site west of the Main Pit, contractor miner camp near the Bonte River and an upgraded and relocated public road;
 
       two options exist for the power supply to the proposed Esaase mine, namely an off-grid connection to the national state utility company Gridco or IPP supply. The Ghanaian utility company, GridCo can supply 34MW at a total cost of USD32m, which maybe significantly reduced due to a redesign of the connection by placing a new 161kV substation on the main line and utilising a single 11km 161 kV overhead line to feed the mine. The costs of the Gridco option for power supply to the proposed Esaase mine are high and Asanko Gold is investigating various alternative options. A quotation from an American based company USP&E Global for a heavy fuel oil power generation installation has been obtained which suggests a capital expenditure of USD22.5m will be required with an operating cost of USD0.15/kWh;
 
       the initial project start-up water requirement of 1.4Mm3 will be sourced from the Mpatoam wier and Bonte river in the wet season and stored initially in the L-TSF. Potable water demand during construction and steady state production will reach a maximum of 168m3 per day to be supplied by ten boreholes. The water balance model is based on a closed circuit for beneficiation process water and the TSFs, with make-up water supply from pit dewatering. A process water buffer dam has been designed to capture low arsenic process water. The Esaase mine will eventually be a net water positive situation and at steady state production, the total water in slurry discharged to the mine residue disposal facilities will be 920m3/hr of which 60% to 90% is returned to the plant process water circuit. The surface water management system for the Project will consist of two separate systems namely, a clean water diversion system to control the uncontaminated run-off from the higher lying natural environment, and a dirty storm water system to capture the contaminated storm water from plant, operational and processing areas;
 
       the design of the mine residue disposal facilities for the 2013 PFS was undertaken by independent design specialists Epoch Resources and included two facilities namely a clay lined storage facility for the tailings arising from the gravity-flotation circuit of the beneficiation plant and an HDPE lined facility designed to accommodate the tailings from the CIL circuits of the process plant. The cost of the mine residue disposal facilities is a significant factor in the Project economics and approval of the designs by the Ghanaian authorities remains to be granted;
 
       the environmental and social Pre-Feasibility study indicates that in the context of the specifications of Ghanaian legislative requirements, and internationally accepted standards of practice, including the IFC Performance Standards and Equator Principles, the environmental aspects of the Project PFS have been acceptable at this stage of project development. The Equator Principle Finance Institutes would categorise the Esaase Project as a Category A project. Formal consultation and stakeholder engagement regarding the Project have been on-going since 2007 and extensive baseline environment studies have been completed. Key areas of potential environmental impact have been identified and measures to mitigate these risks are to be assessed in the DFS. Key authorisations that are required include various water use licences in terms of the Water Resources Commission and an approved EIS to be submitted in July 2013;
 
       a conceptual rehabilitation and mine closure plan for the proposed Esaase mine and its associated infrastructure was undertaken. An estimate of the required financial provision is USD29.57m including on-going re-habilitation and aftercare;
 
       the Esaase Project pre-production capital expenditure estimate including mining, processing, mine infrastructure, TSFs, power supply, owners costs and indirect costs totals USD260.50m before contingency and USD286.40m including a 10% contingency allowance. The main capital items included in the pre-production capital cost estimate are the processing plant (USD82.9m), the establishment of the initial L-TSF (USD34.4m) and mining pre-stripping and infrastructure (USD13.7m);
 
       in addition to pre-production capital costs, sustaining capital expenditures will be required throughout the LoM mine totalling USD51.9m which includes raises to the TSFs. Certain capital expenditures estimated at USD12.95m were deferred until production commences;
 
Graphic
 
 

 
 
June 2011
107
 
       the operating cost estimates were developed from each of the Project component studies and include mine design criteria, process flow sheet, plant consumable studies, mass and water balance, mechanical and electrical equipment lists, and in-country labour cost data. The average LoM cash operating cost is estimated at USD736/oz Au based on the treatment of 5Mtpa producing an average of 200,000oz/a. The RoM opex is for ore is USD4.64/t with a waste mining opex of USD2.86/t. The process opex is USD10.37/t;
 
       Asanko Gold elected to conduct the PFS on a base case utilising contract mining as opposed to owner operations. The conceptual average mining opex figure for the pit optimisation of USD3.2/t was obtained by combining DRAs database of costs, for similar operations and average costs from the escalated 2011 mining contractor quotations. The processing plant opex was USD10.37/t milled resulting in a total cash operating cost (excluding royalties) of USD30.00/t milled;
 
       Venmyn Deloitte constructed a Discounted Cash Flow (DCF) model for the purposes of the economic analysis of the Esaase Project at a gold price of USD1,400/oz Au. The DCF model was based on input assumptions generated from the 2013 PFS mining schedule, processing schedule, operating costs and capital expenditure estimates. Venmyn Deloitte received input from DRA and Asanko Gold on the timing of the various inputs, including working capital requirements. The DCF model assesses the post-tax real cash flows for the Project at a 5% real discount rate. The economic analysis indicates a positive Net Present Value (NPV) of the Esaase Project of USD354.7m with a post-tax IRR of 23.2%;
 
       the NPV generated from the DCF model proved to be most sensitive to changes in parameters affecting revenue. A 10% change in revenue changes the NPV by 39.1%. The NPV is less sensitive to changes in operating expenditure with a 10% change in opex translating into a 21.9% change in the NPV. A 10% change in capital expenditure changes the NPV by 17.4%. At a 5% discount rate, the critical gold price which generates an NPV of 0 is USD1,049/oz;
 
       risk assessment of the Esaase Project identified 83 risks, of which 2 are extremely high, 44 high, 31 moderate and 6 low to very low. At the current project study stage these risks are without mitigating controls and with such controls identified in the DFS stage, the risks are likely to be reduced. The two extremely high risks relate to the haul roads cross over public roads on level crossings;
 
       the 2013 PFS included a full project execution plan which will be undertaken and managed by DRA. Front-end engineering and early work on site is scheduled for the start of the dry-season in November 2013 and main construction is planned to begin in March 2014. The construction schedule is 18 months with first gold in H1 2015 and steady state production in H2 2015;
 
       Venmyn Deloitte concludes that the 2013 PFS has fulfilled its scope of optimising the process flow design, improving project economics and has succeeded in providing a robust basis for the DFS going forward. The Mineral Resource and Reserve basis is founded in international standard exploration and analytical results and the process flow design is based on reasonable and appropriate metallurgical testwork. The mine design has already identified optimisation opportunities for the DFS which provides positive upside potential to the Project. No environmental or risk factors that cannot be mitigated have been identified and the Project site layout plan adequately accommodates all Project components without impacting areas of environmental sensitivity. Some permits and authorisations remain outstanding and may pose a Project delay risk. The economic analysis shows that the Esaase Project is robust, with an attractive positive NPV even at gold prices less than the current June gold spot price of USD1,379/oz.
 
25. Recommendations
NI 43-101 Item 24
The Venmyn Deloitte review of the 2013 PFS for the Esaase Project has highlighted that the Project is robust and economically viable and Venmyn Deloitte concurs with Asanko Golds decision to progress the Project to the DFS level of investigation. Several opportunities exist to improve upon the economic results of the 2013 PFS which should be investigated in the DFS, namely:-
 
 
Graphic
 
 

 
 
June 2011
108
 
       a metallurgical testwork program focusing on the optimisation of the flotation reagent suite which could result in the reduction of the concentrate mass pull through the float plant to further optimise the process flow sheet and associated costs;
 
       a detailed mine design using the PFS developed modifying factors to improve the conversion of Mineral Resources to Mineral Reserves;
 
       a detailed mine design reflecting higher mining and processing rates whilst treating softer oxide RoM in the early years of the Project LoM; and
 
       further geotechnical engineering studies to determine if steeper pit slope angles can be introduced into the design of the open pit. The metallurgical testwork can commence immediately on the remaining material from the previous metallurgical testwork programme. The detailed mine design will include the deeper sections of the orebody, classified as Measured and Indicated Resources, which would extend the LoM and thereby improve the Project economics further. The proposed costs for the DFS are presented in the table below:-
 
Table 51 : Proposed Expenditure for the Esaase Project DFS
 
DFS PROJECT COMPONENT
ESTIMATED COSTS (USD)
EPCM
1,210,239
Mine Residue storage facilities and water storage dams
31,595
Environmental Studies
115,006
Metallurgical testwork
119,518
Geotechnical studies
269,549
Land survey
63,189
IPP
324,977
DFS implementation and management
541,629
Contingency
273,636
Additional
60,662
TOTAL
3,010,000
 
The Venmyn Deloitte review highlighted the following areas which can be addressed or optimised in the future studies;-

       investigation of the low bias in analytical results for SGS Laboratories, Tarkwa; and
 
       investigation of a relative CRM high bias for Transworld Laboratories as supported by the umpire analysis programme.
 
Graphic
 
 

 
 
June 2011
109

 
 graphic  
 
A.N.Clay
M.Sc. (Geol.), M.Sc. (Min. Eng.), Dip. Bus. M.
Pr Sci Nat, MSAIMM, FAusIMM, FGSSA, MAIMA,
M.Inst.D, AAPG
Managing Director Venmyn Deloitte (Pty) Limited
Date : 27 June 2013
ITR Sections : 1, 2,18, 21, 22, 24, 25, 26,27
 
 graphic  graphic  
    C. Muller
B.Sc.Hons (Geol.)
Pr Sci Nat
Director Minxcon (Pty) Limited
Date 27 June 2013\
ITR Sections : 3, 4, 5, 6, 7, 8, 9, 10, 11,13
 
F. Coetzee
B.Sc.Hons (Environmental Management)
Pr Sci Nat (400440/04)
Director Epoch Resources (Pty) Limited
Section
Date : 27 June 2013
ITR Sections : 19 to 19.4
 graphic  graphic
 
G. Bezuidenhout
N.D.T. Ex. Met
FSIAMM
Process Director
Date : 27 June 2013
ITR Sections : 12 and 16
 
GJ Wiid
MSc Eng (Civil)
Pr Eng; MSAIMM
Director, Epoch Resources (Pty) Ltd
Date : 27 June 2013
ITR Sections : 17.5, 19.5, 20.1.3
 graphic  
D. Heher
graphic
 
THOMAS K. OBIRI-YEBOAH
BSc./Post Graduate Diploma Mining Engineering
Pr ECSA, MSAIMM
Senior Mining Engineer-DRA Mining
Date : 27 June 2013
ITR Sections : 14 and 15
B.Sc. (Mechanical Engineering.)
Pr. Eng;
Project Manager
ITR Sections : 17 (excluding 17.5), 23
Date : 27 June 2013
   
    Report Date : 27 June 2013
Effective Date: 14 May 2013
 
 
Graphic
 
 

 
 
June 2011
110

26. References
NI 43-101 Item 26
 
AUTHOR
DATE
TITLE
SOURCE
 
   
Mining Industry of Ghana-Policies and Programs
 
Mining Industry of Ghana 2012
Focused Exploration Providing Growth
 
   
Minerals and Mining Act 2006 (Act 703
gh.mofcom.gov.cn
 
     
http://www.mbendi.com/
     
Keegan Resources Inc website
Leube A., Hirde W., Mauer R.,
 
The early Proterozoic Birimian Supergropu of
 
Kesse G.
 
Ghana and Some Aspects of itsAssociated Gold
Precambrian Res., 46: 139-165
   
Mineralisation
 
   
Geochemistry of Paleoproterozoic
 
Asiedu D.K., Asamoah S., et al
2004
metasedimentary rocks from the Birim
Geochemical Journal v38, 215 to
   
diamondiferous field Southern Ghana
228
Central Intelligence Agency
 
World fact Book
http://www.cia.gov/
   
Esaase Gold Project, Ghana. NI43-101
 
Warries H., Wolfe B., Waller C.
2011
 
Coffey Mining MINEWPER00680AH
   
Technical Report
 
 
2012
Keegan Resources official WebSite
http://www.keeganresources.com/
 
2013
Asanko Gold Lncorporated official website
http://www.asankogold.com/
   
Summary Geological Report on the Esaase
 
Klipfel P
2009
 
Mineral Resource Services, Private
   
Property
 
Lycopodium Minerals (Pty) Limited
2011
Esaase Gold Project
Preliminary Feasibility Study.
   
Structural Controls on Gold Mineralisation in the
 
Smith J.
2007
 
RSG Global (Pty) Limited
   
Esaase Project Area
 
   
Independent Qualified Persons' Report on
 
Umpire A., Muller C.
2012
Esaase Gold project in the Ashanti Region,
Minxcon M12-085
   
Ghana
 
Mayes J.
2013
Environmental and Social Pre feasibility Report
Epoch Resources (Pty) Limited 127-
     
038
 
Graphic
 
 

 
 
June 2011
111

27. Glossary and Abbreviations

⁰C
Degrees celcius
%
Percentage
+
Plus
±
Approximately
º
Degrees
µ
Microns
<
Less than
>
Greater than
/
Per
amsl
Above mean sea level
AusIMM
Australian Institute of Mining and Metallurgy
Au
Chemical Symbol for gold
bn
billion
BBWi
Bond ball work index
B.Sc. (Geol)
Bachelor of Science Degree in Geology
B.Sc. Hons
Bachelor of Science degree with Honours
CIL
Carbon in leach
cmg/t
centimetre grams per tonne
CRM
Certified reference materail
L-TSF
CIL tailings storage facility
DCF
Discounted cash flow
DFS
Definitive Feasibility Study
DTM
Digital terrain model
EIA
Environmental Impact Assessment
ESIA
Environmental and social impact assessemtn
EIS
Environmental Impact Statement
EP
Equator Priniclpes
EPCM
Engineering procurement construction and management
F-TSF
Flotation tailings storage facility
g/t
grams per tonne
GDP
Gross domestic product
GPS
Geographical Positioning System
ha
hectares
HDPE
High density polyethylene
JORC
Joint Ore Reserves Committee
IFC
International Finance Corporation
IP
Induced polarisation
IPP
Independent Power Producer
IRR
Internal rate of Return
km
Kilometres
kV
Kilo volts
kWh
Kilo watt hour
kt
Kilo tonnes
LoM
Life of Mine
m
metres
mg/L
Milligram per litre
MW
Megawatt
mRL
Metres relative level
Mt
Million tonnes
mamsl
Metres above mean sea level
 
mbs
Metres below surface
Moz
Million troy ounce
Mtpa
Million tonnes per annum
my
million years
LEI
Layered earth inversions
NPV
Net present value
pa
per annum
P&G
Preliminary and general
oz
troy ounce
PFS
Pre Feasibility Study
SAG
Semi autonomous grinding
SMC
SAG mill comminution test
SCADA
Supervisory control and data acquistion
t
tonnage
 
Graphic
 
 

 
 
June 2011
112
 
tph
Tonnes per hour
tpm
Tonnes per month
TSF
Tailings storage facility
TMC
The Minerals Corporation
TSS
Total suspended solids
RC
Reverse circulation
RoM
Run-of-mine
UCS
Unconfined compressional strength
USD
United States of America Dollar
2D
Two dimensional
3D
Three dimensional
VTEM
Versatile time domain electromagnetic survey
 
 

Graphic
 
 

 
June 2011
113
 
Assay
A chemical test performed on a sample of ores or minerals to determine the amount of valuable metals contained.
Assay map
Plan view of an area indicating assay values and locations of all samples taken on the property.
Arsenopyrite
It is the principal ore of arsenic and a common mineral with lead and tin ores in ore veins, and in pegmatites,
 
probably having been deposited by action of both hydrothermal solutions and vapours
Block Model
Technique for modelling which divides the resources into mineable blocks.
 
Coarse grained clastic rock composed of broken, angular rock fragments enclosed in a fine-grained matrix
Breccias
or held together by a mineral content. Fault breccias are composed of fragments produced by rock
 
fragments produced by rock fracturing during faulting and other crustal deformation.
Borehole
A hole drilled from surface or underground, in which core of the rock is cut by diamond drill bit as the cutting edge.
 
A large sample of mineralised rock, frequently hundreds of tonnes, selected in such a manner as to be
Bulk sample
representative of the potential orebody being sampled. Used to determine metallurgical characteristics,
 
Large sample which is processed through a small-scale plant, not a laboratory.
Carbonates
A mineral type containing the carbonate radical (CO3)2-
 
The recovery process in which Au is leached from Au ore pulp by cyanide and simultaneously adsorbed onto
Carbon-in-leach
activated carbon granules in the same vessel. The loaded carbon is then separated from the pulp for
 
subsequent Au removal by elution. The process is typically employed where there is a naturally occurring Au
 
adsorbent in the ore.
Carbon-in-pulp
A method of recovering Au and silver from pregnant cyanide solutions by adsorbing the precious metals to
 
granules of activated carbon, which are typically ground up coconut shells.
Chalcopyrite
A brassy or golden-yellow tetragonal mineral CuFeS2, that is an important ore of copper.
Coffey Mining
Coffey Mining Proprietary Limited
Cross section
A diagram or drawing that shows features transected by a vertical plane drawn at right angles to the longer
 
axis of a geologic feature.
DRA
DRA Minerals Projects Limited
Density
Measure of the relative "heaviness" of objects with a constant volume, density = mass/volume
Deposit
Any sort of earth material that has accumulated through the action of wind, water, ice or other agents.
Development property
A mineral property that is being prepared for mineral production and for which economic viability has been
 
demonstrated.
Diamond drilling
A drilling method, where the rock is cut with a diamond bit, to extract cores.
Dip
The angle that a structural surface, i.e. a bedding or fault plane, makes with the horizontal measured
 
perpendicular to the strike of the structure.
Epoch
Epoch Resources Proporietary Limited
Estimation
The quantitative judgement of a variable.
Exploration
Prospecting, sampling, mapping, diamond drilling and other work involved in the search for mineralisation.
Exploration Property
A Mineral Asset which is being actively explored for Mineral deposits or petroleum fields, but for which
 
economic viability has not been demonstrated.
 
A definitive engineering estimate of all costs, revenues, equipment requirements and production levels likely
Feasibility study
to be achieved if a mine is developed. The study is used to define the economic viability of a project and to
 
support the search for project financing.
Grade
The relative quantity or percentage of gold within the rock mass. Measured as grams per tonnes in this report.
Hanging wall
The overlying unit of a stratigraphic horizon, fault ore body or stope
In situ
In its original place, most often used to refer to the location of the mineral resources.
 
That part of a mineral resource for which tonnage, densities, shape, physical characteristics, grade and
 
average mineral content can be estimated with a reasonable level of confidence. It is based on exploration
Indicated Mineral Resource
sampling and testing information gathered through appropriate techniques from locations such as outcrops,
 
trenches, pits, workings and drill holes. The locations are too widely or inappropriately spaced to confirm
 
geological and/or grade continuity but are spaced closely enough for continuity to be assumed and sufficient
 
minerals have been recovered to allow a confident estimate of average mineral value.
 
That part of a mineral resource for which tonnage, grade and average mineral content can be estimated with
 
a low level of confidence. It is inferred from geological evidence and assumed but not verified by geological
Inferred Mineral Resource
and/or grade continuity. It is based on information gathered through appropriate techniques from locations
 
such as outcrops, trenches, pits, workings and drill holes that may be limited or of uncertain quality and reliability.
Keegan Resources
Keegan Resources Ghana Limited
Life-of-Mine/LoM
Expected duration of time that it will take to extract accessible material.
Liberation
Release of Au from the host rock through processing.
 
Lithologies
The description of the characteristics of rocks, as seen in hand-specimens and outcrops on the basis of
 
colour, grain size and composition.
Lycopodium
Lycopodium Minerals Proprietary Limited
 
Any right to explore and / or mine which has been granted ("property"), or entity holding such property or the
 
securities of such an entity, including but not limited to all corporeal and incorporeal property, mineral rights,
 
mining titles, mining leases, intellectual property, personal property (including plant equipment and
Mineral Asset(s)
infrastructure), mining and exploration tenures and titles or any other right held or acquired in connection
 
with the finding and removing of minerals and petroleum located in, on or near the earth‟s crust. Mineral
 
Assets can be classified as Dormant Properties, Exploration Properties, Development Properties, Mining
 
Properties or Defunct Properties.
 
The economically mineable material derived from a Measured and/or Indicated Mineral Resource. It is
 
inclusive of diluting materials and allows for losses that may occur when the material is mined. Appropriate
 
assessments, which may include feasibility studies, have been carried out, including consideration of and
Mineral Reserve
modification by, realistically assumed mining, metallurgical, economic, marketing, legal, environmental,
 
social and governmental factors. These assessments demonstrate at the time of reporting that extraction is
 
reasonably justified. Mineral Reserves are sub-divided in order of increasing confidence into Probable
 
Mineral Reserves and Proved Mineral Reserve.
 
 
Graphic
 
 

 
 
June 2011
114
 
 
A concentration of material of economic interest in or on Earth‟s crust in such form, quality and quantity that there are reasonable and realistic prospects for eventual economic extraction. The location, quantity, grade, continuity geological characteristics of a Mineral Resource are known, estimated from specific geological evidence and knowledge, or interpreted from a well constrained and portrayed geological model. Mineral
Mineral Resource
Resources are subdivided, in order of increasing confidence in respect of geoscientific evidence, into Inferred, Indicated and Measured categories.
A deposit is a concentration of material of possible economic interest in, on or near the Earth‟s crust.
Portions of a deposit that do not have reasonable and realistic prospects for eventual economic extraction must not be included in a Mineral resource.
That part of a mineral resource for which tonnage, densities, shape, physical characteristics, grade and mineral content can be estimated with a high level of confidence. It is based on detailed and reliable
Measured Mineral Resource
exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill-holes. The locations are spaced closely enough to confirm geological and grade continuity.
Mineralisation Mining Property National instrument 43-101
The presence of a target mineral in a mass of host rock. a Mineral Asset which is in production.
Canadian National Instrument on the reporting of exploration, mineral resources and mineral reserves for the TSX.
Opencast / Open pit
Surface mining in which the ore is extracted from a pit. The geometry of the pit may vary with the characteristics of the ore body.
Optimisation Orebody
Creating the best mining scenario while taking into account the economic parameters of the deposit. A continuous well defined mass of material of sufficient ore content to make extraction economically feasible.
Overburden
The alluvium and rock that must be removed in order to expose an ore deposit.
Is the economically mineable material derived from a Measured and/or Indicated Mineral Resource. It is estimated with a lower level of confidence than a Proved Reserve. It is inclusive of diluting materials and
Probable reserves
allows for losses that may occur when the material is mined. Appropriate assessments, which may include feasibility studies, have been carried out, including consideration of, and modification by, realistically assumed mining, metallurgical, economic, marketing, legal, environmental, social and governmental factors. These assessments demonstrate at the time of reporting that extraction is reasonably justified.
Reef
Mineralised lode.
The process of restoring mined land to a condition approximating to a greater or lesser degree its original
Rehabilitation
state. Reclamation standards are determined by the Russia Federation Department of Mineral and Energy Affairs and address ground and surface water, topsoil, final slope gradients, waste handling and re- vegetation issues.
Sample
The removal of a small amount of rock pertaining to the deposit which is used to estimate the grade of the deposit and other geological parameters.
Sampling
Taking small pieces of rock at intervals along exposed mineralisation for assay (to determine the mineral content).
Sedimentary
Formed by the deposition of solid fragmental or chemical material that originates from weathering of rocks and is transported from a source to a site of deposition.
Specific gravity/S.G. Stockpile
Stripping Stripping ratio Subduction
Measure of quantity of mass per unit of volume, density. A store of unprocessed ore or marginal grade material. Removal of waste overburden covering the mineral deposit. Ratio of ore rock to waste rock.
The movement of one crustal plate (lithospheric plate) under another so that the descending plate is
"consumed.
Tailings
The waste products of the processing circuit. These may still contain very small quantities of the economic mineral.
Tailings dam
Dams or dumps created from waste material from processed ore after the economically recoverable metal or mineral has been extracted.
Tonnage
Quantities where the tonne is an appropriate unit of measure. Typically used to measure reserves of metal- bearing material in-situ or quantities of ore and waste material mined, transported or milled.
Veins
A tabular or sheet like body of one or more minerals deposited in openings of fissures, joints or faults, frequently with associated replacement of the host rock.
 
Graphic
 
 

 
 
June 2011
115
 
28. Certificates of Qualified Persons'
 
Andrew Neil Clay
Venmyn Deloitte (Pty) Ltd
First Floor, Block G, Rochester Place
173 Rivonia Road
Sandton
2146
South Africa
Telephone: +27 11 783 9903
Fax: +27 11 783 9953
 
CERTIFICATE OF THE AUTHOR OF NATIONAL INSTRUMENT 43-101 INDEPENDENT TECHNICAL REPORT ON ASANKO GOLD INCORPORATEDS PRE-FEASIBILITY STUDY ON THE ESAASE PROJECT IN GHANA

I, Andrew Clay, do hereby certify that I am a Managing Director of Venmyn Deloitte (Pty) Limited:-

2.    I am a graduate in Geology and a Bachelor of Science from University College Cardiff in 1976
3.    I am a member/fellow of the following professional associations. I have extensive experience in gold deposits as summarised below.
 
CLASS
PROFESSIONAL SOCIETY
YEAR OF REGISTRATION
Member
Canadian Institute of Mining, Metallurgy and Petroleum
2006
Advisor
JSE Limited Listings Advisory Committee
2005
Associate Member
American Association of Petroleum Geologists
2005
Member
South African Institute of Directors
2004
Fellow
Geological Society of South Africa
2003
Member
American Institute of Mineral Appraisers
2002
Member
South African Institute of Mining and Metallurgy
1998
Fellow
Australasian Institute of Mining and Metallurgy
1994
Member
Natural Scientist Institute of South Africa
1988
Member
Investment Analysts Society of South Africa
1990
 
4.     I have practiced my profession continuously since graduation;
5.     I have not visited the Esaase Project;
6 .    I have read the definition of Qualified Person and Qualified Valuator as set out in NI43-101 and CIMVAL and certify that by reason of my education, affiliation with a professional association and past relevant work experience, I fulfil the requirements to be a "Qualified Person" and   "Qualified Valuator" for the purposes of NI43-101 and CIMVAL;
7.     I have had no prior involvement with the property that is the subject of the Technical Report;
8.     I have read NI43-101, Form 43-101F1 and CIMVAL Standards and Guidelines, and the Technical Report and Valuation Report have been prepared in compliance with these instruments and form;
9.     I am responsible for Section 1, 2, 18, 21, 22, 24, 25, 26, 27 of the Technical Report entitled National Instrument 43-101 Independent Technical Report on Asanko Gold Incorporateds Pre-feasibility Study on the Esaase Project in Ghana
10.     At the date hereof, to the best of my knowledge, information and belief, the Technical Report contains all scientific and technical information that is required to be disclosed to make the Technical Report not misleading;
11.    I am independent of the issuer applying all of the tests in Section 1.5 of NI43-101; and
12.    I consent to the filing of the Technical Report with any stock exchange and other regulatory authority and any publication by them for regulatory purposes, including electronic publication in the public company files on their websites accessible by the public, of the Technical Report.
Dated this 27 June 2013 at Johannesburg, South Africa.

Graphic
A.N.CLAY
M.Sc. (Geol.), M.Sc. (Min. Eng.), Dip. Bus. M.
Pr Sci Nat, MSAIMM, FAusIMM, FGSSA, MAIMA, M.Inst.D., AAPG
 
 
Graphic
 
 

 
 
June 2011
116
 
Managing Director
Andrew Neil Clay - Gold Experience
 
YEAR
CLIENT
COMMODITY
DOCUMENTATION
2013
Eureka
Gold
Technical Statement
2013
Gold One Tulo Gold
Gold
Valuation
2013
Eureka Delta Gold
Gold
Technical Statement
2012
Banro Lugushwa
Gold
Technical Review
2012
Central Rand Gold
Gold
CPR
2012
Loncor Ngayu
Gold
Mineral Resource Valuation
2012
Loncor Makapela/Mangajuripa
Gold
Mineral Resource Valuation
2012
Stonebridge Hanieal Mozambique
Gold
Corporate Advice and Project setup
2012
Stonebridge Zim Gold
Gold
Corporate Advice and Project setup
2012
Terra Nova Manica Investment
Gold
Technical and Corporate Valuation
2012
Virgil Mining
Gold
Technical Report
2012
Sikhuliso Harmony Dumps
Gold
Corporate Transaction Advice
2012
Wits Gold
Gold
CPR and Valuation
2012
Pan African Resources
Gold
CPR and Valuation
2012
Banro
Gold
Technical Report and Valuation
2012
Harmony Evander
Gold
Full CPR and Valuation
2012
NMIC
Gold
Technical Report and Valuation
2011
SSC Mandarin
Gold
Independent Corporate and Technical Advisor
2011
Harmony
Gold
CPR
2011
Banro
Gold
Independent Technical Statement
2011
Xceed Capital
Coal
Independent Valuation Statement
2011
Taung
Gold
Hong Kong Listing
2011
Axmin
Gold
Technical and Economic Documentation
2011
AMRT
Copper/Gold
Scoping Study
2011
Jindal Mining
Coal
Techno-Economic Statement on the Mbili Coal Project
2011
Kibo Mining
Gold/Various
Tanzanian Assets
2010
AMRT
Gold
Independent Sampling and Mass Balance Report
2010
White Water Resources
Gold
Independent Competent Persons‟ Report
2010
White Water Resources
Gold
Independent Technical Statement
2010
West Wits Mining
Gold
Independent Prospectivity Review
2010
SSC Mandarin
Gold
Independent Corporate and Technical Review
2010
Taung
Gold
Independent Technical Review
2010
Taung
Gold
Independent Valuation Statement
2010
Mzuri Capital
Gold
Independent AIM Compliant CPR
2010
Loncor
Gold
Independent Techno-Economic Valuation Report
2010
Nyota Minerals
Gold
Independent Inferred Resource Estimate
2010
White Water Resources
Gold
Short-Form Valuation Statements
2010
Central African Gold
Gold
NI 43 - 101 Technical Report
2009
Metorex
Gold
Independent Fairness Opinion
2009
Taung Gold
Gold
Independent Competent Person‟s Report
     
Independent Valuation Report on mineral assets of a
2009
Ernst & Young Jordan
Gold
Gold Mining Concession in Ethiopia
     
Independent Technical Statement on Tulu Kapi Gold
2009
Dwyka Resources
Gold
Project
     
Information Memorandum in the form of NI 43-101
2009
Central African Gold
Gold
Compliant Technical Statement
2009
New Dawn
Gold
Independent Technical Statement
 
 
Graphic
 
 

 
 
June 2011
117


Douglas Heher
DRA Mineral Projects (Pty) Ltd
DRA Campus
3 Inyanga Close
Sunninghill
2157
South Africa
Telephone: +27 11 202 8600

CERTIFICATE OF THE AUTHOR OF NATIONAL INSTRUMENT 43-101 INDEPENDENT TECHNICAL REPORT ON ASANKO GOLD INCORPORATEDS PRE-FEASIBILITY STUDY ON THE ESAASE PROJECT IN GHANA"

I, Douglas Heher, Pr. Eng. (Reg. No. 990333) do hereby certify that:-
 
1.     I am a Project Manager of DRA Mineral Projects (Pty) Ltd
DRA Campus
3 Inyanga Close
Sunninghill
2157
South Africa
2.     I graduated with a B.Sc. Engineering (Mechanical) degree from the University of KwaZulu Natal - Durban in 1992;
3.    I am a member of the following professional associations:-
Registered Professional Engineer with the Engineering Council of South Africa (ECSA - Reg. No. 990333) I have completed gold and other studies as summarised below.
4.    I have practiced my profession from 1997 to now
5.    I have visited the Esaase Project;
6.    I have read the definition of Qualified Person as set out in NI43-101 and certify that by reason of my education and affiliation with a professional association (as defined in NI43-101), I fulfil the requirements to be a Qualified Person for the purposes of NI43-101;
7.   I have had prior involvement with the property that is the subject of the Technical Report - through previous concept and trade off work;
8.    I have read NI43-101 and Form 43-101F1, and the Technical Report has been prepared in compliance with that instrument and form;
9.    I am responsible for Sections 17 (except 17.5), 20, 23.1, 23.2 of the Technical Report entitled National Instrument 43-101 Independent Technical Report on Asanko Gold Incorporateds Pre-feasibility Study on the Esaase Project in Ghana;
10.    At the date hereof, to the best of my knowledge, information and belief, the Technical Report contains all scientific and technical information that is required to be disclosed to make the Technical Report not misleading;
11.    I am independent of the issuer applying all of the tests in Section 1.5 of NI43-101; and
12.    I consent to the filing of the Technical Report with any stock exchange and other regulatory authority and any publication by them for regulatory purposes, including electronic publication in the public company files on their websites accessible by the public, of the Technical Report.

Dated this 27 June 2013 at Johannesburg, South Africa.

Graphic
D. Heher
B.Sc. (Mechanical Engineering.)
Pr. Eng;
Project Manager
 
Graphic
 
 

 
 
June 2011
118

Project Management Experience D. Heher
 
YEAR CLIENT COMMODITY TYPE OF STUDY PROJECT DESCRIPTION
2008
Red Island Minerals
Coal
PFS
PFS on Sakoa deposit in Madagascar incl. infrastructure
2008/9
Lonmin / Anglo JV
Platinum
DFS
Full process study incl. test work on the Pandora mine
2010
Confidential
Iron Ore / Coal
Concept
Bulk port on Yangtze river in China
2011
ENRC
Copper
Concept
3.6 Mtpa Copper Concentrator in the DRC
2011
ENRC
Copper
FS
3.6 Mtpa Copper Concentrator in the DRC
2012
ENRC
Copper
Execution
3.6 Mtpa Copper Concentrator in the DRC
2012
Frontier
Rare Earths
PFS
Zandkopsdrift study in Northern Cape (still in progress)
2012
CIC Energy
Coal
Concept
Capex estimate for complete coal complex in Botswana
2012
Keegan
Gold
PFS review
Review of 3rd party PFS for Esaase mine in Ghana
2012
Keegan
Gold
Concept
Trade Off Study for the Esaase mine in Ghana
2013
Asanko
Gold
PFS
Full PFS from mining to economics - Esaase Ghana
 

Graphic
 
 

 
 
June 2011
119

Charles Muller
Suite 5 Coldstream Office Park,
Cnr Hendrik Potgieter and Van Staden Roads,
Little Falls,
Johannesburg, South Africa


CERTIFICATE OF THE AUTHOR OF 'NATIONAL INSTRUMENT 43-101 INDEPENDENT TECHNICAL REPORT ON ASANKO GOLD INCORPORATED'S PRE-FEASIBILITY STUDY ON THE ESAASE PROJECT IN GHANA"
 
1.     I, Charles Muller do hereby certify that I am a I am Director of Minxcon (Pty) Ltd
Suite 5 Coldstream Office Park,
Cnr Hendrik Potgieter and Van Staden Roads,
Little Falls,
Johannesburg, South Africa
2.    I graduated with a B.Sc. (Geology) degree from the Rand Afrikaans University in 1988. In addition, I have obtained a B.Sc. Hons (Geology) from the Rand Afrikaans University in 1994 and attended courses in geostatistics and advanced Datamine modelling and geostatistical evaluation through the University of the Witwatersrand.
3.    I am a member/fellow of the following professional associations.
Class Professional Society                                                     Year of Registration
Member Geostatistical Association of Southern Africa 2008
Member South African Council for Natural Scientific Professions (Pr. Sci. Nat. Reg. No. 400201/04) 2004
4.    I have practiced my profession from 1988;
5.    I have visited the Esaase Project between 29 September and 2 October 2012;
6.    I have read the definition of 'Qualified Person' as set out in NI43-101 and certify that by reason of my education and affiliation with a professional association (as defined in NI43-101), I fulfil the requirements to be a 'Qualified Person' for the purposes of NI43-101;
7.    I undertook the 2012 Mineral Resource estimate for the Esaase Project;
8.    I have read NI43-101 and Form 43-101F1, and the Technical Report has been prepared in compliance with that instrument and form;
9.    I am responsible for Sections 4, 5, 6, 7, 8, 9, 10, 11, 13 of the Technical Report entitled 'National Instrument 43-101 Independent Technical Report on Asanko Gold Incorporated's Pre-feasibility Study on the Esaase Project in Ghana';
10.    At the date hereof, to the best of my knowledge, information and belief, the Technical Report contains all scientific and technical information that is required to be disclosed to make the Technical Report not misleading;
11.    I am independent of the issuer applying all of the tests in Section 1.5 of NI43-101; and
12.    I consent to the filing of the Technical Report with any stock exchange and other regulatory authority and any publication by them for regulatory purposes, including electronic publication in the public company files on their websites accessible by the public, of the Technical Report.
 
Dated this 27 June 2013 at Johannesburg, South Africa.
Graphic
C. Muller
B.Sc.Hons (Geol.)
Pr Sci Nat
Director Minxcon
 
Graphic
 
 

 
 
June 2011
120

Fanie Coetzee
Epoch Resources (Pty) Ltd
Building 22A
The Woodlands
2148
South Africa
Telephone: +27 11 656 0380
Fax: +27 11 802 3654

CERTIFICATE OF THE AUTHOR OF 'NATIONAL INSTRUMENT 43-101 INDEPENDENT TECHNICAL REPORT ON ASANKO GOLD INCORPORATED'S PRE-FEASIBILITY STUDY ON THE ESAASE PROJECT IN GHANA"

I, Fanie Coetzee, Pr. Sci. Nat (400017/08) do hereby certify that:-
 
1.    I am a Director at Epoch Resources (Pty) Ltd
Building 22A
The Woodlands
South Africa
2.    I graduated with a B.Sc.Hons (Environmental Management) degree from the Potchefstroom University in 1996;
3.    I am a member/fellow of the following professional associations:-
    International Association for Impact Assessors
    Member South African Council for Natural Scientific Professions (400440/04)
3.    I have completed numerous Technical Reports and due diligences for gold projects (see attached table).
4.    I have practiced my profession from 1997;
5.    I have visited the Esaase Project;
6.    I have read the definition of 'Qualified Person' as set out in NI43-101 and certify that by reason of my education and affiliation with a professional association (as defined in NI43-101), I fulfil the requirements to be a 'Qualified Person' for the purposes of NI43-101;
7.    I have had no prior involvement with the property that is the subject of the Technical Report;
8.    I have read NI43-101 and Form 43-101F1, and the Technical Report has been prepared in compliance with that instrument and form;
9.    I am responsible for Section 19 of the Technical Report entitled 'National Instrument 43-101 Independent Technical Report on Asanko Gold Incorporated's Pre-feasibility Study on the Esaase Project in Ghana';
10.    At the date hereof, to the best of my knowledge, information and belief, the Technical Report contains all scientific and technical information that is required to be disclosed to make the Technical Report not misleading;
11.    I am independent of the issuer applying all of the tests in Section 1.5 of NI43-101; and
12.    I consent to the filing of the Technical Report with any stock exchange and other regulatory authority and any publication by them for regulatory purposes, including electronic publication in the public company files on their websites accessible by the public, of the Technical Report.

Dated this 27 June 2013 at Johannesburg, South Africa.

Graphic

F. Coetzee
B.Sc.Hons (Env Management.)
Pr Sci Nat (400440/04)
Director
 
Graphic
 
 

 
 
June 2011
121

Relevant Gold Project Experience for F. Coetzee
 
YEAR
CLIENT
COMMODITY
TYPE OF STUDY
PROJECT DESCRIPTION
2009
Development Bank of
   
Due diligence study of the Hwange Colliery
 
SA
Coal
Due Diligence
as part of loan application, SA
2006
Anglo Coal
Coal
Closure Review
Liability assessment associated with mine
       
closure planning, SA
     
Environmental and closure
Legal compliance and Environmental and
2009
Snowden Resources
Coal
 
closure review for the Medupi Coal Mine
     
review
expansion project, SA
2010
GeoPro Mining
Copper
Environmental audit
Legal compliance of the Agrarak Copper
       
Mine, Armenia
 
Mantra Tanzania
 
Environmental review and
ESIA amendment for authorisation,
2012
 
Uranium
   
 
Limited
 
ESIA
Tanzania
 
Falcon Gold
 
Environmental review and
ESIA amendment for authorisation of the
2012
 
Gold
   
 
Resources
 
ESIA
Mkuju Project, Tanzania
       
ESIA for authorisation for the Estima Coal
2013
ENRC
Coal
ESIA
Mine, Mozambique
2012
Todal Mining
Platinum
ESIA
ESIA for authorisation for the Bokai Mine,
       
Zimbabwe
 
Blackthorn
   
ESIA addendum for authorisation for the
2011
 
Zinc
ESIA
 
 
Resources
   
Perkoa Zinc Mine, Burkina Faso
     
Feasibility study,
 
2010
ARM Platinum
Platinum
environmental audit and
Feasibility study for the Two Rivers
     
performance assessment
Platinum Mine, SA
2011
Iron Ore Producer
Iron
Due diligence
Environmental due diligence and legal
       
compliance of activities, SA
2013
Papillion Resources
Gold
ESIA
ESIA for the authorisation of the Fekola
       
Gold Mine, Mali
 
 
Graphic
 
 

 
 
June 2011
122
 
Guy Wiid
Epoch Resources (Pty) Ltd
First Floor, Building 22A, The Woodlands
Woodlands Drive
Woodmead
2080
South Africa
Telephone: +27 11 656 0381
Fax: +27 11 802 3654

CERTIFICATE OF THE AUTHOR OF NATIONAL INSTRUMENT 43-101 INDEPENDENT TECHNICAL REPORT ON ASANKO GOLD INCORPORATEDS PRE-FEASIBILITY STUDY ON THE ESAASE PROJECT IN GHANA"

I, Guy John Wiid Pr.Eng (940269) do hereby certify that:-
 
1.    I am a practicing Professional Engineer and Director of Epoch Resources (Pty) Ltd specialising in the design and management of Mine Residue Disposal Facilities and in Mine Closure Planning
First Floor, Building 22A, The Woodlands
Woodlands Drive
Woodmead
2080
South Africa
2.    I graduated with BSc Eng (Civil) (1988) and an MSc Eng (Civil) (1995) degrees from the University of the Witwatersrand;
3.    I am a member/fellow of the following professional associations:-
Member : Engineering Council of South Africa (ECSA)
Associate Member : South African Institute of Mining and Metallurgy (SAIMM)
4.    I have completed numerous Technical Reports and due diligences for gold projects as summarised below;
5.    I have practiced my profession from 1990 to 2013;
6.    I have not visited the Esaase Project;
7.    I have read the definition of Qualified Person as set out in NI43-101 and certify that by reason of my education and affiliation with a professional association (as defined in NI43-101), I fulfil the requirements to be a Qualified Person for the purposes of NI43-101;
8.    I have had no prior involvement with the property that is the subject of the Technical Report;
9.    I have read NI43-101 and Form 43-101F1, and the Technical Report has been prepared in compliance with that instrument and form;
10.    I am responsible for Sections 17.5, 19.5 and 20.1.3 of the Technical Report entitled National Instrument 43-101 Independent Technical Report on Asanko Gold Incorporateds Pre-feasibility Study on the Esaase Project in Ghana;
11.    At the date hereof, to the best of my knowledge, information and belief, the Technical Report contains all scientific and technical information that is required to be disclosed to make the Technical Report not misleading;
12.    I am independent of the issuer applying all of the tests in Section 1.5 of NI43-101; and
13.    I consent to the filing of the Technical Report with any stock exchange and other regulatory authority and any publication by them for regulatory purposes, including electronic publication in the public company files on their websites accessible by the public, of the Technical Report.
 
 

 
Dated this 27 June 2013 at Johannesburg, South Africa.

Graphic


GJ Wiid
MSc Eng (Civil)
Pr Eng; MSAIMM
Director, Epoch Resources (Pty) Ltd
 
Graphic
 
 

 
 
June 2011
123

GJ Wiid - Selection of Recent Gold Project Experience
 
YEAR
CLIENT
COMMODITY
TYPE OF STUDY
PROJECT DESCRIPTION
 
London Mining
Iron Ore Bankable Feasibility Study
Design of Tailings Storage Facility, Sierra
2013
Company / Tenova Bateman
    Leone
2013
Sephaku Fluorspar
Fluorspar
Pre-Feasibility Study
Design of Tailings Storage Facility, South
       
Africa
       
Estimate of rehabilitation and closure
2012/3
ENRC
Coal
Feasibility Study
liabilities for inclusion in EIA / EMP
       
submissions, Mozambique
     
Preliminary Economic
Design of Tailings Storage Facility and
2012/3
Sedex Minerals
Rare Earths
Assessment, Pre-Feasibility Study
Waste Rock Dumps, South Africa
2012/3
Exxaro / Aurecon
Coal
Bankable Feasibility Study
Design of Coal Discard Facility, South Africa
       
Review of Tailings Storage Facility and
2012/3
ENRC
Copper
Review and Ongoing Technical
ongoing technical assistance in re-
     
Assistance
commissioning and operations for a
       
Tailings Storage Facility, DRC
2012
AngloGold Ashanti
Gold
Pre-Feasibility Study
Definitive Feasibility Design Tailings
       
Storage Facility, Namibia
 
Nyota Minerals /
Gold Definitive Feasibility Study
Definitive Feasibility Design Tailings
 
Golder Associates
   
Storage Facility, Ethiopia
2011
Metallon Gold
Gold
Technical and Operational
Technical review of the operations of 5
     
Review of Tailings Operations
Tailings Storage Facilities, Zimbabwe
       
Design of Platinum Tailings Storage
2011
Platmin
Platinum
Pre-Feasibility Study
Facility, Waste Rock Dumps and Surface
       
Water Management Works, North Wast,
       
South Africa
2010 Samancor Manganese
Pre-Feasibility and Feasibility
Pre-Feasibility and Feasibility Design of
      Studies
Manganese Tailings Storage Facility, Gabon
2009
Sephaku Fluorspar
Fluorspar
Definitive Feasibility Study
Design of Tailings Storage Facility, South Africa
 
Anglo Coal / Snowdens
Coal
Review and Update of
Review and update of rehabilitation and
2009
   
Rehabilitation and Closure Liabilities
closure liabilities for 10 collieries, South Africa
2008/9
Boynton Investments
Platinum
Bankable Feasibility Study
Design of Tailings Storage Facility,
       
Limpopo, South Africa
2008/9
Boynton Investments
Platinum
Bankable Feasibility Study
Design of Tailings Storage Facility,
       
Mpumulanga, South Africa
     
Review and Update of
Annual review and update of financial
2006 - 8
Tati Nickel
Nickel
Rehabilitation and Closure
provisions for closure
     
Liabilities
 
     
Review and Estimate of
Review and estimate of closure liabilities
2006
Ferro Nickeli
Nickel
Rehabilitation and Closure
for a group of nickel mines, smelter and
     
Liabilities
slag dumps, Macedonia, Kosovo, Albania
2006
       
       
Status review and of existing TSF and
2005
Uranium One
Uranium / Gold
Feasibility Study
feasibility design of proposed expansion,
       
South Africa
     
Feasibility and Detailed
Feasibility and Detailed Design of Platinum
2005 - Present
Platmin
Platinum
Design, Ongoing Technical
Tailings Storage Impoundment, North
     
Assistance
West, South Africa
 
Graphic
 
 

 
 
June 2011
124

Glenn Bezuidenhout
DRA Mineral Projects (Pty) Ltd
DRA Campus
3 Inyanga Close
Sunninghill
2157
South Africa
Telephone: +27 11 202 8600

CERTIFICATE OF THE AUTHOR OF NATIONAL INSTRUMENT 43-101 INDEPENDENT TECHNICAL REPORT ON ASANKO GOLD INCORPORATEDS PRE-FEASIBILITY STUDY ON THE ESAASE PROJECT IN GHANA"

I, Glenn Bezuidenhout, FSAIMM (Member No. 705704) do hereby certify that:-
 
1.     I am a Process Director (Pty) Ltd
DRA Campus
3 Inyanga Close
Sunninghill
2157
South Africa
2.    I graduated with a National Diploma from the Witwatersrand Technicon - Johannesburg in 1979;
3.    I am a member of the following professional associations:-
Fellow of the South African Institute of Mining and Metallurgy (Membership No.705704) I have experience in gold operations, studies and projects as summarised below.
4.    I have practiced my profession from 1979 to now
5.    I have not visited the Esaase Project;
6.    I have read the definition of Qualified Person as set out in NI43-101 and certify that by reason of my education and affiliation with a professional association (as defined in NI43-101), I fulfil the requirements to be a Qualified Person for the purposes of NI43-101;
7.    I have had prior involvement with the property that is the subject of the Technical Report - through previous concept and trade off work;
8.    I have read NI43-101 and Form 43-101F1, and the Technical Report has been prepared in compliance with that instrument and form;
9.     I am responsible for Sections 12 and 16 of the Technical Report entitled National Instrument 43-101 Independent Technical Report on Asanko Gold Incorporateds Pre-feasibility Study on the Esaase Project in Ghana;
10.    At the date hereof, to the best of my knowledge, information and belief, the Technical Report contains all scientific and technical information that is required to be disclosed to make the Technical Report not misleading;
11.    I am independent of the issuer applying all of the tests in Section 1.5 of NI43-101; and
12.    I consent to the filing of the Technical Report with any stock exchange and other regulatory authority and any publication by them for regulatory purposes, including electronic publication in the public company files on their websites accessible by the public, of the Technical Report.

Dated this 27 June 2013 at Johannesburg, South Africa.
Graphic

G. Bezuidenhout
N.D.T. Ex. Met.
FSIAMM
Process Director
 
Graphic
 
 

 
 
June 2011
125
 
YEAR CLIENT COMMODITY TYPE OF STUDY PROJECT DESCRIPTION
 
Eastern Transvaal
 
Gold Plant
 
1979 to 1982
Consolidated Mines
Gold
Operations
Plant Superintendent
         
     
Gold Plant
 
1982 to 1985
Village Main Reef
Gold
Operations
Plant Superintendent
         
 
Consolidated
 
Gold Plant
 
1985 to 1987
Modderfontein Gold
Gold
Operations
Plant Superintendent
 
Mines
     
2009/10
West Wits
Gold
FS
3.0Mtpa Dump Retreatment - Gold Fields
2010/11
Perseus
Gold
Execution
5.5Mtpa Edikan Gold Plant in Ghana
2012
Aureus
Gold
FS
1.1Mtpa New Liberty Gold Plant in Liberia
2012/13
Pappillon
Gold
PFS
4.0Mtpa Fekola Gold Plant in Mali
2013
Newmont
Gold
Execution
6.0Mtpa Ahafo Gold Plant in Ghana
2012
Keegan
Gold
PFS review
Review of 3rd party PFS for Esaase mine in Ghana
2012
Keegan
Gold
Concept
Trade Off Study for the Esaase mine in Ghana
2013
Asanko
Gold
PFS
Full PFS from mining to economics - Esaase Ghana
 
 
Graphic
 
 

 
 
June 2011
126
 
Thomas Obiri-Yeboah
DRA Mining (Pty) Ltd
Bldh H, DRA Mineral Park
3 Inyanga Close, Sunninghill 2157
P.O Box 3567, Rivonia 2128 Johannesberg, South Africa Telephone: +27 11 517 0638
Fax: +27 11 517 0744

CERTIFICATE OF THE AUTHOR OF NATIONAL INSTRUMENT 43-101 INDEPENDENT TECHNICAL REPORT ON ASANKO GOLD INCORPORATEDS PRE-FEASIBILITY STUDY ON THE ESAASE PROJECT IN GHANA"

I, Thomas Obiri-Yeboah, do hereby certify that I am a Senior Mining Engineer of:-
DRA Mining (Pty) Ltd
Bldh H, DRA Mineral Park
3 Inyanga Close, Sunninghill 2157
P.O Box 3567, Rivonia 2128 Johannesburg, South Africa Telephone: +27 11 517 0638
Fax: +27 11 517 0744
2.    I am a graduate in Mining Engineering - a Bachelor of Science and Post Graduate Diploma in Mining Engineering from University of Mines and Technology, Tarkwa Ghana in 1991 and 1992 respectively;
3.    I am a member/fellow of the following professional associations:-
Member South African Institute of Mining Metallurgy 2009
Member Engineering Council of South Africa 2010
4.    I have practiced my profession continuously since graduation;
5.    I have not visited the Esaase Project;
6.    I have read the definition of Qualified Person as set out in NI43-101 and certify that by reason of my education and affiliation with a professional association (as defined in NI43-101), I fulfil the requirements to be a Qualified Person for the purposes of NI43-101;
7.    I have had no prior involvement with the property that is the subject of the Technical Report;
8.    I have read NI43-101 and Form 43-101F1, and the Technical Report has been prepared in compliance with that instrument and form;
9.    I am responsible for Sections 14 and 15 of the Technical Report entitled National Instrument 43-101 Independent Technical Report on Asanko Gold Incorporateds Pre-feasibility Study on the Esaase Project in Ghana;
10.    At the date hereof, to the best of my knowledge, information and belief, the Technical Report contains all scientific and technical information that is required to be disclosed to make the Technical Report not misleading;
11.    I am independent of the issuer applying all of the tests in Section 1.5 of NI43-101; and
12.    I consent to the filing of the Technical Report with any stock exchange and other regulatory authority and any publication by them for regulatory purposes, including electronic publication in
the public company files on their websites accessible by the public, of the Technical Report.

Dated this 27 June 2013 at Johannesburg, South Africa.

Graphic


THOMAS K. OBIRI-YEBOAH
BSc./Post Graduate Diploma Mining Engineering
Pr ECSA, MSAIMM
Senior Mining Engineer-DRA Mining
 
Graphic
 
 

 
 
June 2011
127

Summary Recent Gold Project Experience T Yeboah
 
YEAR
CLIENT
COMMODITY
TYPE OF STUDY
PROJECT DESCRIPTION
1999-2001 Ashanti GoldFields Gold
Prefeasibility/Bankable
Geita Mine-Tanzania
      Feasibility Study
 
2002
Ashanti GoldFields
Gold
Due Diligent Study
Teberebie Project - Ghana
2002
Ashanti GoldFields
Gold
Due Diligent Study
Abore Project - Ghana
2002
Ashanti GoldFields
Gold
Due Diligent Study
Abronye Project - Ghana
2002
Ashanti GoldFields
Gold
Due Diligent Study
Akokerri Project-Ghana
2002
Ashanti GoldFields
Gold
Economic Viability
Bibiani Mine Main Pit Cutback - Ghana
2002
Ashanti GoldFields
Gold
Due Diligent Study
Chirano Project-Ghana
2002
Ashanti GoldFields
Gold
Due Diligent Study
Mampong Project-Ghana
2003
Ashanti GoldFields
Gold
Due Diligent Study
Akim Project(now for Newmont)-Ghana
2003
Ashanti GoldFields
Gold
Due Diligent Study
Ntotoroso Project-Ghana
2003
Ashanti GoldFields
Gold
Due Diligent Study
Wassaw Mpohor(now for BogosoMine)-Ghana
2003
Ashanti GoldFields
Gold
Due Diligent Study
Ajopa Project-Ghana
2003
Ashanti GoldFields
Gold
Feasibility Study
Youga Mine Project-Burkina Faso
2003
Ashanti GoldFields
Gold
Due Diligent Study
Essanka Project-Burkina Faso
2003
Ashanti GoldFields
Gold
Due Diligent Study
Ity Mine Project-Cote D,ivoie
2003
Ashanti GoldFields
Gold
Due Diligent Study
Siguiri Gold Mine Project-Guinea
2003
Ashanti GoldFields
Gold
Due Diligent Study
Ran and Phoenix Projects-Freda Rebecca
       
Mines-Zimbabwe
2004
Anglogold Ashanti
Gold
Due Diligent Study
Loulu Project-Mali
2004
Anglogold Ashanti
Gold
Due Diligent Study
Tabakoto Project-Mali
2006
Anglogold Ashanti
Gold
Yearly „Mine Planning Wheel‟
Sadiola/Yatela Mine - Mali
2007 Glencore-Mutanda Copper/Cobalt Feasibility Study
Mutanda Mines-Kolwezi, Lubumbashi-DRC
2008
KatangaMines
Copper/Cobalt
Mining Engineering
Katanga Mines-Kolwezi, Lubumbashi-DRC
2009
Platinum Australia
Gold
Feasibility Study
Kalplats Project-South Africa
2010
Mantra
Uranium
Feasibility Study
Mkuju River Project-Tanzania
2011
Mantra
Uranium
Definitive Feasibility Study
Mkuju River Project-Tanzania
2012
Mantra
Uranium
Definitive Feasibility Study-2
Mkuju River Project-Tanzania
2013
Uranium One(Russia)
Uranium
Feed Phase
Mkuju River Project-Tanzania

 
Deloitte refers to one or more of Deloitte Touche Tohmatsu Limited (DTTL), a UK private company limited by guarantee, and its network of member firms, each of which is a legally separate and independent entity. Please see www.deloitte.com/about for a detailed description of the legal structure of Deloitte Touche Tohmatsu Limited and its member firms.
 
Deloitte provides audit, tax, consulting and financial advisory services to public and private clients spanning multiple industries. With a globally connected network of member firms in more than 150 countries, Deloitte brings world-class capabilities and high-quality service to clients, delivering the insights they need to address their most complex business challenges. Deloitte has in the region of 200,000 professionals, all committed to becoming the standard of excellence.
 
© 2013 Deloitte & Touche. All rights reserved. Member of Deloitte Touche Tohmatsu Limited
 
 