SECURITIES AND EXCHANGE COMMISSION FORM 6-K Report of Foreign Private Issuer Indicate by check mark whether the registrant
files or will file annual reports under cover of Form 20-F or Form 40-F:
Form 20-F
Washington, DC 20549
Pursuant to Rule 13a-16 or 15d-16 of
the Securities Exchange Act of 1934
For the month of: May, 2008
Commission File Number: 001-33086
LUNDIN MINING CORPORATION
(Name of Registrant)
Suite 2101
855 West Georgia Street
Vancouver, British Columbia
Canada V6C 3E8
(604) 689-7842
(Address of Principal Executive Offices)
Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(1): £
Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(7): £
Indicate by check mark whether by furnishing the information contained in this Form, the registrant is also thereby furnishing the information to the Commission pursuant to Rule 12g3-2(b) under the Securities Exchange Act of 1934:
Yes £ No Q
If "Yes" is marked, indicate below the file number assigned to the registrant in connection with Rule 12g3-2(b): N/A
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
LUNDIN MINING CORPORATION | |||
Date: May 15, 2008 |
By: | /s/ Kevin Hisko | |
Name: | Kevin Hisko | ||
Title: | Corporate Secretary |
EXHIBITS
LUNDIN MINING CORPORATION
CONSOLIDATED BALANCE SHEETS
(Unaudited - in thousands of US dollars)
March 31, | December 31, | |||
2008 | 2007 | |||
ASSETS | ||||
Current | ||||
Cash and cash equivalents |
$ | 92,606 | $ | 133,207 |
Accounts receivable |
199,868 | 110,873 | ||
Inventories |
82,310 | 46,791 | ||
Prepaid expenses |
11,998 | 11,298 | ||
386,782 | 302,169 | |||
Reclamation fund | 64,616 | 59,174 | ||
Mineral properties, plant and equipment | 2,418,608 | 2,233,030 | ||
Investments | 1,542,154 | 1,525,181 | ||
Other assets | 8,478 | 6,763 | ||
Future income tax assets | 83,294 | 80,582 | ||
Goodwill | 545,608 | 503,925 | ||
$ | 5,049,540 | $ | 4,710,824 | |
LIABILITIES | ||||
Current | ||||
Accounts payable |
$ | 108,027 | $ | 106,266 |
Accrued liabilities |
90,324 | 90,865 | ||
Income taxes payable |
77,281 | 103,526 | ||
Current portion of long term debt and capital leases |
8,237 | 8,640 | ||
Current portion of deferred revenue |
4,929 | 7,243 | ||
288,798 | 316,540 | |||
Long-term debt and capital leases | 188,545 | 89,496 | ||
Other long-term liabilities | 7,387 | 5,301 | ||
Deferred revenue | 162,826 | 148,878 | ||
Derivative instruments liability | 9,842 | 10,502 | ||
Provision for pension obligations | 18,789 | 17,074 | ||
Asset retirement obligations and other provisions | 145,995 | 132,080 | ||
Future income tax liabilities | 476,927 | 448,619 | ||
Non-controlling interest | 502 | 528 | ||
1,299,611 | 1,169,018 | |||
SHAREHOLDERS' EQUITY | ||||
Share capital | 3,219,671 | 3,233,682 | ||
Contributed surplus | 18,317 | 14,179 | ||
Accumulated other comprehensive income | 410,480 | 271,301 | ||
Retained earnings | 101,461 | 22,644 | ||
3,749,929 | 3,541,806 | |||
$ | 5,049,540 | $ | 4,710,824 |
APPROVED BY THE BOARD | ||
(Signed) Lukas H. Lundin | (Signed) Dale C. Peniuk | |
Lukas H. Lundin, Director | Dale C. Peniuk, Director | |
See accompanying notes to consolidated financial statements |
1
LUNDIN MINING CORPORATION
CONSOLIDATED STATEMENTS OF OPERATIONS
(Unaudited - in thousands of US dollars, except for shares and per share
amounts)
Three months ended |
||||
March 31, |
||||
2008 | 2007 | |||
Sales |
$ |
305,732 |
$ |
193,920 |
Expenses |
|
|
|
|
Mining operations |
|
(104,988) |
|
(68,033) |
Accretion of asset retirement obligations |
|
(2,447) |
|
(1,120) |
Depreciation, depletion and amortization |
|
(52,907) |
|
(34,810) |
General exploration and project investigation |
|
(10,086) |
|
(5,231) |
Selling, general and administration |
|
(11,121) |
|
(5,433) |
Stock-based compensation |
|
(4,235) |
|
(1,520) |
Foreign exchange losses |
|
(6,224) |
|
(2,720) |
Losses on derivative instruments |
|
(3,611) |
|
(5,524) |
Interest and other income and expenses |
|
2,813 |
|
4,029 |
Interest and bank charges |
|
(3,416) |
|
(910) |
|
(196,222) |
|
(121,272) | |
Earnings before undernoted items |
|
109,510 |
|
72,648 |
Operating losses in equity investments |
|
(111) |
|
- |
Loss on sale of assets |
|
(12) |
|
- |
Non-controlling interest |
|
3 |
|
- |
Earnings before income taxes |
|
109,390 |
|
72,648 |
Current income taxes |
|
(30,229) |
|
(16,700) |
Future income taxes |
|
(344) |
|
(3,868) |
Net earnings for the period |
$ |
78,817 |
$ |
52,080 |
|
|
|
|
|
Earnings per share |
|
|
|
|
Basic |
$ |
0.20 |
$ |
0.18 |
Diluted |
$ |
0.20 |
$ |
0.18 |
Weighted average number of shares outstanding |
|
|
|
|
Basic |
390,821,044 |
|
285,453,531 |
|
Diluted |
390,942,398 |
|
286,057,904 |
2
LUNDIN MINING CORPORATION
CONSOLIDATED STATEMENTS OF COMPREHENSIVE INCOME
(Unaudited - in thousands of US dollars)
Three months ended |
||||
March 31, |
||||
2008 | 2007 | |||
Net earnings for the period |
$ |
78,817 |
$ |
52,080 |
Other comprehensive income |
|
|
|
|
Decrease in fair value of available-for-sale securities, net of taxes |
|
(28,477) |
|
8,357 |
Unrealized loss on available-for-sale securities disposed during the period |
|
24 |
|
- |
Cumulative translation adjustment |
|
167,632 |
|
19,602 |
|
139,179 |
|
27,959 |
|
Comprehensive income for the period |
$ |
217,996 |
$ |
80,039 |
See accompanying notes to consolidated financial statements
3
LUNDIN MINING CORPORATION
CONSOLIDATED STATEMENTS OF CHANGES IN SHAREHOLDERS EQUITY
(Unaudited - in thousands of US dollars)
|
Accumulated | ||||||||||
|
Other | ||||||||||
|
Number of | Share | Contributed | Comprehensive | Retained | ||||||
|
Shares | Capital | Surplus | Income | Earnings | Total | |||||
Balance, December 31, 2007 |
392,489,131 |
$ |
3,233,682 |
$ |
14,179 |
$ |
271,301 |
$ |
22,644 |
$ |
3,541,806 |
Stock-based compensation |
- |
|
- |
|
4,235 |
|
- |
|
- |
|
4,235 |
Exercise of stock options & SARs |
75,000 |
|
546 |
|
- |
|
- |
|
- |
|
546 |
Transfer of fair value on exercise of stock options & SARs |
- |
|
97 |
|
(97) |
|
- |
|
- |
|
- |
Shares purchased and cancelled pursuant to normal course issuer bid |
(2,150,700) |
|
(14,654) |
|
- |
|
- |
|
- |
|
(14,654) |
Translation adjustment for the period |
- |
|
- |
|
- |
|
167,632 |
|
- |
|
167,632 |
Changes in fair value of available-for-sale securities |
- |
|
- |
|
- |
|
(28,477) |
|
- |
|
(28,477) |
Unrealized loss on available-for-sale securities disposed during the period |
- |
|
- |
|
- |
|
24 |
|
- |
|
24 |
Net earnings for the period |
- |
|
|
|
- |
|
- |
|
78,817 |
|
78,817 |
Balance, March 31, 2008 |
390,413,431 |
$ |
3,219,671 |
$ |
18,317 |
$ |
410,480 |
$ |
101,461 |
$ |
3,749,929 |
See accompanying notes to consolidated financial statements
4
LUNDIN MINING CORPORATION
CONSOLIDATED STATEMENTS OF CASH FLOWS
(Unaudited - in thousands of US dollars)
Three months ended March 31, |
||||
2008 | 2007 | |||
Operating activities | ||||
Net earnings for the period |
$ |
78,817 |
$ |
52,080 |
Items not involving cash |
|
|
|
|
Depreciation, depletion and amortization |
|
52,907 |
|
34,912 |
Amortization of deferred revenue |
|
(1,619) |
|
(1,107) |
Stock-based compensation |
|
4,235 |
|
1,520 |
Future income tax expense |
|
344 |
|
3,868 |
Accretion on asset retirement obligations |
|
1,556 |
|
- |
Provision for pensions |
|
891 |
|
221 |
Other |
|
(196) |
|
4,230 |
Unrealized losses (gains) on derivative instruments |
|
(1,378) |
|
7,095 |
Unrealized foreign exchange losses |
|
4,354 |
|
3,791 |
|
139,911 |
|
106,610 |
|
Reclamation payments |
|
(113) |
|
- |
Changes in non-cash working capital items |
|
(136,318) |
|
(95,937) |
Cash flow from operating activities |
|
3,480 |
|
10,673 |
Financing activities |
|
|
|
|
Common shares issued |
|
544 |
|
4,310 |
Put premium payments |
|
- |
|
(3,889) |
Proceeds from loans and other long-term obligations |
|
95,871 |
|
- |
Purchase of treasury shares |
|
(17,974) |
|
- |
Debt and capital lease payments |
|
(1,278) |
|
(1,106) |
|
77,163 |
|
(685) | |
Investing activities |
|
|
|
|
Mineral property, plant and equipment expenditures |
|
(79,315) |
|
(33,090) |
Investment in Tenke Fungurume |
|
(42,000) |
|
- |
Investments in available-for-sale securities |
|
(4,675) |
|
(58,430) |
Other |
|
517 |
|
4 |
|
(125,473) |
|
(91,516) | |
Effect of foreign exchange on cash and cash equivalents |
|
4,229 |
|
(3,249) |
Decrease in cash and cash equivalents during period |
|
(40,601) |
|
(84,777) |
Cash and cash equivalents, beginning of period |
|
133,207 |
|
402,170 |
Cash and cash equivalents, end of period |
$ |
92,606 |
$ |
317,393 |
Supplemental Cash Flow Information (Note 14)
See accompanying notes to consolidated financial statements
5
LUNDIN MINING CORPORATION
Notes to interim consolidated financial statements
For the three months ended March 31, 2008
(Unaudited - Tabular amounts are in thousands of US dollars, except for price
per share and per share amounts)
1.
BASIS OF PRESENTATION
The unaudited interim consolidated financial statements of Lundin Mining Corporation (the "Company" or "Lundin Mining") are prepared in accordance with Canadian generally accepted accounting principles using the same accounting policies and methods of application as those disclosed in Note 3 to the Companys consolidated financial statements for the year ended December 31, 2007.
These interim consolidated financial statements do not contain all of the information required by Canadian generally accepted accounting principles for annual financial statements and therefore should be read in conjunction with the Companys 2007 audited consolidated financial statements.
These unaudited interim consolidated financial statements reflect all normal and recurring adjustments which are, in the opinion of management, necessary for a fair presentation of the respective interim periods presented.
Certain of the 2007 figures have been reclassified to conform to the 2008 presentation.
2.
SIGNIFICANT CHANGES IN ACCOUNTING POLICIES
New Accounting Standards
Effective January 1, 2008 the Company has adopted the following CICA accounting standards:
a)
Section 1535 Capital Disclosures
This Section establishes standards for disclosing quantitative and qualitative information about the Companys capital and how it is managed, thereby enabling users to evaluate the Companys objectives, policies and processes for managing capital.
b)
Section 3031 Inventories
This Section prescribes the accounting treatment for inventories and provides guidance on the determination of costs and its subsequent recognition as an expense, including any write-down to net realizable value. It also provides guidance on the cost formulas that are used to assign costs to inventories. Adoption of this standard did not have any effect on the financial statements.
c)
Section 3862 Financial Instruments Disclosures
This Section requires additional disclosure of the significance of financial instruments to the Companys financial position and performance as well as quantitative and qualitative information that enable users to evaluate the nature and extent of risks arising from those financial instruments.
International Financial Reporting Standards ("IFRS")
In 2006, the Canadian Accounting Standards Board ("AcSB") published a new strategic plan that will significantly affect financial reporting requirements for Canadian companies. The AcSB strategic plan outlines the convergence of Canadian GAAP with IFRS over an expected five year transitional period.
6
LUNDIN MINING CORPORATION In February 2008 the AcSB announced that 2011 is the
changeover date for publicly-listed companies to use IFRS, replacing Canada's
own GAAP. The date is for interim and annual financial statements relating to
fiscal years beginning on or after January 1, 2011. The transition date of
January 1, 2011 will require the restatement for comparative purposes of amounts
reported by the Company for the year ended December 31, 2010. 3.
Notes to interim consolidated financial statements
For the three months ended March 31, 2008
(Unaudited - Tabular amounts are in thousands of US dollars, except for price
per share and per share amounts)
INVENTORIES
Inventories consist of:
March 31, |
December 31, |
|||
2008 |
2007 |
|||
Ore stock piles | $ |
21,273 |
$ |
9,858 |
Concentrate stock piles |
29,161 |
11,449 |
||
Materials and supplies |
31,876 |
25,484 |
||
$ |
82,310 |
$ |
46,791 |
4.
MINERAL PROPERTIES, PLANT AND EQUIPMENT
Mineral properties, plant and equipment consist of:
March 31, 2008 |
|
|||||||
|
Accumulated |
|
|
|||||
|
depreciation, |
|
|
|||||
|
|
depletion and |
|
|
||||
Cost |
amortization |
Impairment |
Net |
|||||
Exploration properties | $ |
304,172 |
$ |
- |
$ |
- |
$ |
304,172 |
Mineral properties |
1,954,488 |
335,155 |
- |
1,619,333 |
||||
Plant and equipment |
440,352 |
88,833 |
- |
351,519 |
||||
Development |
143,584 |
- |
- |
143,584 |
||||
$ |
2,842,596 |
$ |
423,988 |
$ |
- |
$ |
2,418,608 |
|
|
|
|
|
|||||
|
|
|
|
|||||
December 31, 2007 |
|
|||||||
|
Accumulated |
|
|
|||||
|
depreciation, |
|
|
|||||
|
depletion and |
|
|
|||||
Cost |
amortization |
Impairment |
Net |
|||||
Exploration properties | $ |
281,787 |
$ |
- |
$ |
- |
$ |
281,787 |
Mineral properties |
1,874,790 |
298,775 |
78,590 |
1,497,425 |
||||
Plant and equipment |
421,962 |
73,288 |
- |
348,674 |
||||
Development |
219,657 |
- |
114,513 |
105,144 |
||||
$ |
2,798,196 |
$ |
372,063 |
$ |
193,103 |
$ |
2,233,030 |
7
LUNDIN MINING CORPORATION 5.
Notes to interim consolidated financial statements
For the three months ended March 31, 2008
(Unaudited - Tabular amounts are in thousands of US dollars, except for price
per share and per share amounts)
INVESTMENTS
Investments include the following:
March 31, |
December 31, |
|||
2008 |
2007 |
|||
Available-for-sale securities | $ |
182,982 |
$ |
207,814 |
Equity investments |
1,359,172 |
1,317,367 |
||
$ |
1,542,154 |
$ |
1,525,181 |
(a)
Available-for-sale securities
Available-for-sale securities consist of marketable securities which had a market value of $182.9 million at March 31, 2008 (December 31, 2007 $207.8 million). These investments consist of shares in publicly traded mining and exploration companies.
The Company holds less than a 20% equity interest in each of the company in which it holds available-for-sale securities and does not exercise significant influence over any of these companies.
(b)
Equity investments
Equity investments consist of the following:
March 31, |
December 31, |
|||
2008 |
2007 |
|||
Tenke Fungurume Holdings Ltd. | $ |
1,356,814 |
$ |
1,314,814 |
Sanu Resources Inc. |
2,358 |
2,553 |
||
$ |
1,359,172 |
$ |
1,317,367 |
During the quarter ended March 31, 2008, the Company made additional cash advances of $42.0 million to fund its portion of the Tenke project expenditures.
On February 19, 2008, the Company received a copy of a letter from the Ministry of Mines, Government of the Democratic Republic of Congo (the "Government") pertaining to the review of mining contracts in the country. This letter was addressed to Tenke Fungurume Mining S.A.R.L. ("TFM") and request further discussions take place with Gecamines, the DRC state-owned mining company, on such matters as the quantum of transfer payments, percentage share ownership and its involvement in the management in TFM, regularization of certain issues under Congolese law and the implementation of social plans.
The Company believes that its agreements with Freeport McMoRan Copper and Gold Inc. ("Freeport") and TFMs agreements with the Government are legally binding, that all associated issues have been dealt with fully under Congolese law and that the overall fiscal terms previously negotiated and incorporated into the Amended and Restated Mining Convention exceed the requirements of the Congolese Mining Code. An appropriate response has been made to the Ministry of Mines; however, until there is a resolution in this matter, the carrying value of the Companys interest is subject to uncertainty.
8
LUNDIN MINING CORPORATION
Notes to interim consolidated financial statements
For the three months ended March 31, 2008
(Unaudited - Tabular amounts are in thousands of US dollars, except for price
per share and per share amounts)
6.
LONG-TERM DEBT AND CAPITAL LEASES
Long-term debt and capital leases consist of: |
|
|
||
March 31, |
December 31, |
|||
2008 |
2007 |
|||
|
|
|||
Five year revolving credit facility | $ |
135,222 |
$ |
40,352 |
Somincor bonds due 2009 |
42,625 |
39,369 |
||
Capital lease obligations |
8,193 |
8,358 |
||
Deferred employee housing sales |
297 |
274 |
||
Investment incentive loan |
550 |
729 |
||
Aljustrel debt |
2,723 |
2,516 |
||
Rio Narcea debt |
7,172 |
6,538 |
||
196,782 |
98,136 |
|||
Less: current portion | (8,237) | (8,640) | ||
|
|
|||
$ |
188,545 |
$ |
89,496 |
Management believes that the fair value of long-term debt approximates its carrying value.
7.
DEFERRED REVENUE
The following table summarizes the changes in deferred revenue balance:
Balance, December 31, 2007 | $ |
156,121 |
Amortization during period | (1,619) | |
Effect from changes in foreign exchange rates |
13,253 |
|
167,755 |
||
Less: current portion | (4,929) | |
|
||
Balance, March 31, 2008 | $ |
162,826 |
8.
DERIVATIVE INSTRUMENTS LIABILITY
The derivative contracts include forward sale, swap, option contracts for the purpose of managing the related risks and are not for trading purposes. As at March 31, 2008, the Company had derivative liabilities for future metal delivery commitments as follows:
Outstanding Contractual Obligations due | ||||||||||||
2008 | 2009 | 2010 and beyond | ||||||||||
Average price |
Quantity | Average price |
Quantity | Average price |
Fair Value as at | |||||||
Units | Quantity | (000's) | (000's) | March 31, 2008 | ||||||||
Lead | tonnes | 6,375 | $ | 0.68 | - | - | - | - | $ | (8,359) | ||
Zinc | tonnes | 1,800 | $ | 1.23 | - | - | - | - | 670 | |||
Silver | ounces | 75,276 | $ | 11.60 | 117,072 | $ | 11.60 | 167,460 | $ | 11.60 | (2,153) | |
$ | (9,842) |
9
LUNDIN MINING CORPORATION 9.
Notes to interim consolidated financial statements
For the three months ended March 31, 2008
(Unaudited - Tabular amounts are in thousands of US dollars, except for price
per share and per share amounts)
ASSET RETIREMENT OBLIGATIONS AND OTHER PROVISIONS
The asset retirement obligations and other provisions relating to the operations of Neves-Corvo, Zinkgruvan, Storliden, Aljustrel, Aguablanca and Galmoy mines, are as follows:
|
Employee |
|
||||
|
Severance due |
|
||||
Site |
on mine |
|
||||
Restoration |
closure |
Total |
||||
|
|
|
||||
Balance, December 31, 2007 | $ |
121,871 |
$ |
10,209 |
$ |
132,080 |
Accretion expense |
1,530 |
- |
1,530 |
|||
Other provisions |
- |
891 |
891 |
|||
Reclamation expenditures |
(350) |
- |
(350) | |||
Effect on changes in foreign exchange rates |
10,198 |
1,646 |
11,844 |
|||
Balance, March 31, 2008 | $ |
133,249 |
$ |
12,746 |
$ |
145,995 |
10.
HARE CAPITAL
(a)
The authorized and issued share capital is as follows:
Authorized unlimited number of common shares with no par value and one special share with no par value.
(b)
Stock options
The Company has an incentive stock option plan (the "Plan") available for certain employees, directors and officers to acquire shares in the Company. At the October 19, 2006 Special Meeting of Shareholders, the shareholders of the Company approved a resolution setting the number of shares reserved under the Plan at 7,000,000. As a result of a three-for-one stock split of the Company's shares on February 5, 2007, the number of shares reserved under the Plan amounts to 21,000,000, which is less than 10% of the number of issued and outstanding shares of the Company. The term of any options granted will be fixed by the Board of Directors and may not exceed 10 years from the date of grant.
Option pricing models require the input of highly subjective assumptions including the expected price volatility and expected life. Changes in the subjective input assumptions can materially affect the fair value estimate and therefore the existing models do not necessarily provide a reliable single measure of the fair value of the Companys stock options granted or vested during the year.
The Company uses the fair value method of accounting for all stock-based payments to employees, directors and officers. During the first quarter of 2008, the fair value of all new stock option grants was $2.2 million (2007 - $1.0 million). Under this same method, the Company recorded a stock compensation expense of $4.2 million for the first quarter of 2008 (2007 - $1.5 million) with a corresponding credit to contributed surplus. The fair value of the stock options granted at the date of the grant using the Black-Scholes pricing model assumes risk-free interest rates of 3.1% to 3.8%, no dividend yield, expected life of 2.5 years with an expected price volatility ranging from 50% to 53%. Stock options granted during the first quarter of 2008 vest one-third immediately, one-third after one year, and one-third after two years.
10
LUNDIN MINING CORPORATION The unrecognized stock compensation expense for unvested options at March 31,
2008 was $9.0 million. The continuity of incentive stock options issued and outstanding is as
follows:
Notes to interim consolidated financial statements
For the three months ended March 31, 2008
(Unaudited - Tabular amounts are in thousands of US dollars, except for price
per share and per share amounts)
|
Weighted average | ||
Number of |
exercise price |
||
Options |
(CAD$) | ||
|
|
||
Outstanding, December 31, 2007 |
6,117,828 |
$ |
5.11 |
Granted during the quarter |
903,360 |
7.26 |
|
Cancelled during the quarter | (120,000) |
12.74 |
|
Exercised during the quarter | (75,000) |
7.39 |
|
Outstanding, March 31, 2008 |
6,826,188 |
$ |
11.27 |
During the quarter ended March 31, 2008, the Company granted 903,360 incentive stock options to employees and officers at a weighted average price of CAD$7.26 each that expires between January 15, 2013 and March 19, 2013.
The following table summarizes options outstanding as at March 31, 2008, as follows:
Outstanding Options | Exercisable Options | |||||||
Weighted | Weighted | |||||||
Average | Weighted | Average | Weighted | |||||
Remaining | Average | Remaining | Average | |||||
Number of | Contractual | Exercise | Number of | Contractual | Exercise | |||
Range of exercise | Options | Life | Price | Options | Life | Price | ||
prices (CAD$) | Outstanding | (Years) | (CAD$) | Exercisable | (Years) | (CAD$) | ||
$2.28 - $5.79 | 187,068 | 1.9 | $ | 3.40 | 187,068 | 1.9 | $ | 3.40 |
$5.80 - $10.59 | 2,178,360 | 4.3 | 8.76 | 1,383,353 | 4.3 | 8.31 | ||
$10.60 - $14.97 | 4,460,760 | 3.9 | 12.83 | 1,995,960 | 3.1 | 12.87 | ||
6,826,188 | 4.0 | $ | 11.27 | 3,826,381 | 3.5 | $ | 10.75 |
(c)
Stock Appreciation Rights
In 2006, on the acquisition of EuroZinc, the Company issued stock appreciation rights to certain former EuroZinc employees in exchange for the cancellation of their stock options. The terms of the newly issued stock appreciation rights were the same as those of the cancelled options, with the exception of the number of shares and the exercise prices, which were adjusted for the share exchange ratio of the EuroZinc acquisition. Holders of stock appreciation rights have the right to either purchase the shares in the Company or receive a cash payout equal to the excess of the fair market value of the shares over the exercise price on the date of exercise. All stock appreciation rights are fully vested and exercisable.
11
LUNDIN MINING CORPORATION
Notes to interim consolidated financial statements
For the three months ended March 31, 2008
(Unaudited - Tabular amounts are in thousands of US dollars, except for price
per share and per share amounts)
The continuity of stock appreciation rights issued and outstanding is as follows:
Weighted |
|||
average |
|||
Number of stock |
exercise |
||
appreciation |
price |
||
rights |
(CAD$) | ||
Outstanding, December 31, 2007 |
306,720 |
$ |
6.69 |
Exercised during the quarter |
- |
- |
|
Outstanding, March 31, 2008 |
306,720 |
$ |
6.69 |
|
|
||
The stock appreciation rights are recorded as a current liability and are adjusted based on the Companys closing stock price at the end of each reporting period. The liability as at March 31, 2008 was $0.6 million (December 31, 2007 - $1.0 million). |
|||
|
|
||
|
Weighted | ||
|
average |
||
Number of stock |
exercise |
||
appreciation |
price |
||
Expiry date |
rights |
(CAD$) | |
|
|
||
June 8, 2010 |
135,360 |
$ |
2.31 |
May 11, 2011 |
171,360 |
10.15 |
|
Outstanding, March 31, 2008 |
306,720 |
$ |
6.69 |
12
LUNDIN MINING CORPORATION 11. SEGMENTED INFORMATION The Company is engaged in mining, exploration and development
of mineral properties, primarily in Portugal, Spain, Sweden, Ireland, Russia and
the Democratic Republic of Congo. The Company has seven reportable segments as
identified by the individual mining operations at each of its five operating
mines as well as its significant joint venture with Metropol and its investment
in the Tenke Fungurume project. Segments are operations reviewed by the
executive management. Each segment is identified based on quantitative factors
whereby its revenues or assets comprise 10% or more of the total revenues or
assets of the Company. Operating segmented information is as follows:
Notes to interim consolidated financial statements
For the three months ended March 31, 2008
(Unaudited - Tabular amounts are in thousands of US dollars, except for price
per share and per share amounts)
Three months ended March 31, | ||||
2008 |
2007 |
|||
Sales |
|
|
||
Neves-Corvo, Portugal | $ |
169,162 |
$ |
111,507 |
Zinkgruvan, Sweden |
48,633 |
49,476 |
||
Aguablanca, Spain |
51,303 |
- |
||
Galmoy, Ireland |
26,808 |
17,752 |
||
Storliden, Sweden |
9,779 |
15,544 |
||
Other |
47 |
(359) | ||
$ |
305,732 |
$ |
193,920 |
|
|
|
|||
Three months ended March 31, |
||||
2008 |
2007 |
|||
Operating profit* |
|
|
||
Neves-Corvo, Portugal | $ |
101,031 |
$ |
54,204 |
Zinkgruvan, Sweden |
27,730 |
30,766 |
||
Aguablanca, Spain |
10,679 |
- |
||
Galmoy, Ireland |
2,577 |
610 |
||
Storliden, Sweden |
3,484 |
4,748 |
||
Other | (111) | (371) | ||
$ |
145,390 |
$ |
89,957 |
|
|
|
|||
March 31, |
December 31, |
|||
2008 |
2007 |
|||
Total assets |
|
|
||
Neves-Corvo**, Portugal | $ |
2,096,772 |
$ |
1,888,150 |
Zinkgruvan, Sweden |
512,668 |
455,618 |
||
Aguablanca, Spain |
879,824 |
840,175 |
||
Galmoy, Ireland |
175,304 |
169,547 |
||
Storliden, Sweden |
48,670 |
62,330 |
||
Ozernoe, Russia |
168,549 |
164,933 |
||
Tenke Fungurume, Congo |
1,356,818 |
1,314,819 |
||
Other | (189,065) | (184,748) | ||
$ |
5,049,540 |
$ |
4,710,824 |
*
Non-GAAP measure - Operating profit is defined as sales less the cost of mining operations, accretion of asset retirement obligation and depreciation, depletion and amortization.
**
Neves-Corvo figures include the assets of the Aljustrel mine under development in Portugal.
13
LUNDIN MINING CORPORATION
Notes to interim consolidated financial statements
For the three months ended March 31, 2008
(Unaudited - Tabular amounts are in thousands of US dollars, except for price
per share and per share amounts)
Geographic segmented information is as follows:
Three months ended March 31, | ||||
2008 |
2007 |
|||
Sales |
|
|
||
Portugal | $ |
169,162 |
$ |
111,507 |
Sweden |
58,459 |
65,020 |
||
Spain |
51,303 |
- |
||
Ireland |
26,808 |
17,752 |
||
Other |
- |
(359) | ||
$ |
305,732 |
$ |
193,920 |
|
|
|
|||
Three months ended March 31, |
||||
2008 |
2007 |
|||
Operating profit* |
|
|
||
Portugal | $ |
101,001 |
$ |
54,204 |
Sweden |
31,230 |
35,514 |
||
Spain |
10,679 |
- |
||
Ireland |
2,577 |
610 |
||
Other | (97) | (371) | ||
$ |
145,390 |
$ |
89,957 |
|
|
|
|||
March 31, |
December 31, |
|||
2008 |
2007 |
|||
Total assets |
|
|
||
Portugal | $ |
2,097,415 |
$ |
1,888,827 |
Sweden |
272,021 |
208,917 |
||
Spain |
879,954 |
840,175 |
||
Ireland |
175,304 |
169,547 |
||
Russia |
168,549 |
164,933 |
||
Democratic Republic of Congo |
1,356,818 |
1,314,819 |
||
Other |
99,479 |
123,606 |
||
$ |
5,049,540 |
$ |
4,710,824 |
*
Non-GAAP measure - Operating profit is defined as sales less the cost of mining operations, accretion of asset retirement obligation and depreciation, depletion and amortization.
12.
MANAGEMENT OF CAPITAL RISK
The Companys objectives when managing its capital include ensuring a sufficient combination of positive operating cash flows and debt financing in order to meet its ongoing capital development and exploration programs in a way that maximizes the shareholder return given the assumed risks of its operations while at the same time safeguarding the Companys ability to continue as a going concern. The Company considers the following items as capital: shareholders equity and long-term debt.
Through the ongoing management of its capital, the Company will modify the structure of its capital based on changing economic conditions in the jurisdictions in which it operates. In doing so, the Company may issue new shares or debt, buyback issued shares or pay off any outstanding debt, or make changes to its portfolio of strategic investments. The Companys current policy is to not pay out dividends but rather reinvest its earnings in the business.
14
LUNDIN MINING CORPORATION Annual budgeting is the primary tool used to manage the
Companys capital. Updates are made as necessary to both capital expenditure and
operational budgets in order to adapt to changes in risk factors of proposed
expenditure programs and market conditions within the mining industry. The Company continues to be in compliance with all externally
imposed capital requirements, specifically as they relate to debt covenants on
its five-year revolving credit facility (Note 7). 13. MANAGEMENT OF FINANCIAL RISK The Companys financial instruments are exposed to certain
financial risks, including currency risk, price risk, credit risk, interest rate
risk, and liquidity risk. Currency Risk Based on the international nature of its operations, the
Company is exposed to currency risk, with the primary exposures being the US
dollar vis-à-vis both the Euro and the Swedish Krona. A significant change in
the currency exchange rates between the US dollar and either of the
aforementioned foreign currencies could have an effect on the Companys
operating results. Additionally, a significant change in the same currency
exchange rates would have a significant effect on other comprehensive income. As at March 31, 2008, the Company is exposed to currency risk
through the following assets and liabilities denominated in Euros and Swedish
Kronor as noted below:
Notes to interim consolidated financial statements
For the three months ended March 31, 2008
(Unaudited - Tabular amounts are in thousands of US dollars, except for price
per share and per share amounts)
Swedish |
Canadian |
|||
US Dollar |
Euro |
Krona |
Dollar |
|
(millions) | (millions) | (millions) | (millions) | |
Cash and cash equivalents |
56.9 |
1.1 |
1.1 |
- |
Other working capital items |
147.3 |
(0.6) | (1.7) |
- |
Available-for-sale investments |
- |
- |
- |
53.1 |
Long-term debt |
63.2 |
- |
- |
- |
Price Risk
The Company is subject to price risk associated with fluctuations in the market prices for metals. At present the Company has chosen to unwind its existing hedge profile based on its overall view of the commodity markets; however, it may at its election use hedge contracts to manage its exposure to changes in commodity prices, the use of which is subject to both the approval of the Hedge Committee and the Board of Directors. The Company is not only subject to price risk on its hedge profile but also on the final settlement of its trade receivables.
15
LUNDIN MINING CORPORATION The sensitivity of the Companys financial instruments before considering the
effect of increased metal prices on smelter treatment charges is as follows:
Notes to interim consolidated financial statements
For the three months ended March 31, 2008
(Unaudited - Tabular amounts are in thousands of US dollars, except for price
per share and per share amounts)
Effect of financial | |||
Price on | instruments on | ||
March 31/08 | pre-tax earnings | ||
($US/tonne) | Change | ($ millions) | |
Copper | 8,520 | +10% | 8.3 |
Zinc | 2,303 | +10% | 6.4 |
Lead | 2,793 | +10% | 3.0 |
Nickel | 29,805 | +10% | 5.7 |
Credit Risk
The exposure to credit risk arises through the failure of a customer or another third party to meet its contractual obligations with the Company. Cash balances are held in banks which are considered to be of high credit quality. The Company believes that its maximum exposure to credit risk as at March 31, 2008 is the carrying value of its trade receivables. The Company does not hold any asset backed commercial paper.
Interest Rate Risk
The Companys exposure to interest rate risk arises both from the interest rate impact on its cash and cash equivalents as well as on its debt facilities. There is minimal risk that the Company would recognize any loss as a result of a decrease in the fair value of any short-term investments included in cash and cash equivalents as they are generally held to maturity with large financial institutions. The Company does not own any asset-backed commercial paper.
As at March 31, 2008, holding all other variables constant and considering the Companys outstanding debt of $196.8 million, a 1% change in the interest rate would result in an approximate $2.0 million interest expense on an annualized basis.
Liquidity Risk
The Company actively manages its liquidity risk through the use of its cash and cash equivalents as well as its credit facilities. The treasury function is responsible for monitoring actual spending versus forecasted cash flows, selecting short-term investments with maturity profiles that match the expected timing of its obligations.
14.
SUPPLEMENTAL CASH FLOW INFORMATION
Three months ended March 31, | ||||
2008 |
2007 |
|||
Changes in non-cash working capital items consist of: |
|
|
||
Accounts receivable and other current assets |
$ | (98,566) | $ | (38,160) |
Accounts payable and other current liabilities |
(37,752) | (57,777) | ||
$ | (136,318) | $ | (95,937) | |
|
|
|||
Operating activities included the following cash payments: |
|
|
||
Interest paid |
$ |
1,099 |
$ |
419 |
Income taxes paid |
$ |
65,904 |
$ |
41,560 |
16
MANAGEMENTS DISCUSSION AND ANALYSIS
THREE MONTH PERIOD ENDED MARCH 31, 2008
This Management Discussion and Analysis ("MD&A") of Lundin Mining Corporation ("Lundin Mining" or the "Company") has been prepared as of May 14, 2008. The MD&A is intended to supplement and complement the accompanying unaudited interim consolidated financial statements of the Company and the notes thereto for the three months ended March 31, 2008 and should also be read in conjunction with the audited consolidated financial statements of the Company and the notes thereto for the year ended December 31, 2007.
Please also refer to the cautionary statement of forward-looking in formation at the end of this MD&A. Additional information relating to the Company is available on the SEDAR website at www.sedar.com. All financial information in this MD&A is prepared in accordance with Canadian generally accepted accounting principles ("Canadian GAAP"), and all dollar amounts, including comparatives, are expressed in US dollars unless otherwise indicated.
Overview
Lundin Mining is a Canadian-based international mining company that owns and operates the Neves-Corvo copper/zinc mine and the Aljustrel zinc mine in Portugal, the Zinkgruvan zinc/lead/silver mine in Sweden, the Galmoy zinc/lead mine in Ireland and the Aguablanca nickel/copper mine in Spain. Additionally, the Company owns the Storliden copper/zinc mine in Sweden, which is operated by Boliden AB. The Company also holds a 24.75% equity interest in the Tenke Fungurume Project, a major copper-cobalt project under development in the Democratic Republic of Congo ("DRC") and a 49% interest in the Ozernoe zinc project in eastern Russia .
Recent Developments and Highlights
Phil Wright appointed President and CEO of Lundin Mining Corporation
On January 16, 2008, Mr. Phil Wright was appointed President and Chief Executive Officer of Lundin Mining Corporation and joined the Board of Directors of the Company. Mr. Wright is an experienced Chief Executive with expertise in operations, large-scale feasibility studies and project management. He has post-graduate finance qualifications, is a graduate of Harvards School of Business (PMD) and is a Fellow of the Australian Institute of Company Directors and the Financial Services Institute of Australasia.
Developments in the Tenke Fungurume Copper Project
Under the direction of operating partner, Freeport McMoRan Copper and Gold Inc. ("Freeport"), construction progress advanced during the first quarter 2008 for the Tenke Fungurume copper-cobalt deposit in southern Katanga Province, DRC. The first phase of production facilities is designed to produce 115,000 tonnes of copper cathode per year and a minimum 8,000 tonnes of cobalt in hydroxide and cathode metal per year.
As previously announced on April 23, 2008, Freeport advised the Company of further capital cost increases on the Tenke Project. Capital cost estimates for the project were estimated in October 2007 to be $900 million ($1 billion including advances to a third party for the refurbishment of provincial power facilities). A recent capital cost review prepared in April 2008 indicates estimated capital costs of approximately $1.75 billion (approximately $1.9 billion including loans to a third party for power development). These estimates include substantial amounts for infrastructure to support a larger scale operation than the initial phase of the project.
On February 19, 2008, the Company received a copy of a letter from the Ministry of Mines, Government of the Democratic Republic of Congo ("the Government") pertaining to the review of mining contracts in the country. The letter was addressed to Tenke Fungurume Mining S.A.R.L. ("TFM"), the entity which is developing the mine and in which the Company has an equity investment of 24.75%.
1
In the letter, the Ministry of Mines requests that further
discussions take place regarding the TFM mining partnership with Gecamines, the
DRC state-owned mining company. Discussions have been requested in respect of
such matters as the quantum of transfer payments; Gecamines percentage share
ownership in TFM; Gecamines involvement in the management of TFM; regularization
of certain issues under Congolese law; and the implementation of social plans. The Company believes that its agreements with Freeport and
TFMs agreements with the Government are legally binding, that all associated
issues have been dealt with fully under Congolese law and that the overall
fiscal terms previously negotiated and incorporated into the Amended and
Restated Mining Convention exceed the requirements of the Congolese Mining Code.
An appropriate response has been made to the Ministry of Mines. Updated Mineral Reserves and Resources On March 28, 2008, the Company announced its updated Mineral
Reserve and Resource estimate at December 31, 2007. The 2007 Reserve and
Resource estimate represents a significant increase over 2006 resulting from:
exploration success in expanding reserves and replacing production; a
reassessment of cut-off grades; and the acquisition of Rio Narcea which added
nickel to the Companys portfolio. For further information on the Companys Mineral Reserves and
Resources, see the March 28, 2008 news release or the Companys web site:
www.lundinmining.com. Plant Expansion at Neves-Corvo On May 5, 2008, the Company announced the construction of an
additional circuit within the existing copper plant at the Neves-Corvo mine in
Portugal to recover copper and zinc currently lost to tailings. The new circuit
will facilitate recovery of a proportion of the zinc and copper bearing minerals
from the tailings stream as well as provide overall improved management of the
mainstream concentrate. Over the life of the mine this project is expected to
produce 9,500 tonnes of payable copper, 29,000 tonnes of payable zinc and
370,000 ounces of payable silver. For further information on the Companys new zinc circuit at
the Neves-Corvo mine, see the May 5, 2008 news release or the Companys web
site: www.lundinmining.com.
2
Summary of Operations Metal Produced - Own Production*
Three months ended March 31, |
||||
2008 | 2007 | Change | ||
Copper | Neves-Corvo | 22,712 | 23,405 | -3% |
(tonnes) | Storliden | 680 | 1,198 | -43% |
Aguablanca* | 1,548 | - | ||
Total | 24,940 | 24,603 | 1% | |
Zinc | Neves-Corvo | 5,792 | 6,193 | -6% |
(tonnes) | Zinkgruvan | 18,199 | 17,162 | 6% |
Storliden | 2,377 | 4,578 | -48% | |
Galmoy | 13,694 | 9,961 | 37% | |
Aljustrel | 2,957 | - | ||
Total | 43,019 | 37,894 | 14% | |
Lead | Zinkgruvan | 8,782 | 8,643 | 2% |
(tonnes) | Galmoy | 3,795 | 2,404 | 58% |
Total | 12,577 | 11,047 | 14% | |
Nickel | Aguablanca* | 1,848 | - | |
(tonnes) | Total | 1,848 | - | |
Silver | Neves-Corvo | 242,737 | 222,792 | 9% |
(ounces) | Zinkgruvan | 415,672 | 439,014 | -5% |
Galmoy | 59,106 | 19,022 | 211% | |
Total | 717,515 | 680,828 | 5% |
* Pre-acquisition production from Aguablanca during the quarter ended March 31, 2007 for copper and nickel was 1,645 tonnes and 1,631 tonnes, respectively.
Metal Sold and Payable | ||||
Three months ended March 31, |
||||
2008 | 2007 | Change | ||
Copper | Neves-Corvo | 17,506 | 18,899 | -7% |
(tonnes) | Storliden | 656 | 1,049 | -37% |
Aguablanca | 1,269 | - | ||
Total | 19,431 | 19,948 | -3% | |
Zinc | Neves-Corvo | 4,005 | 4,664 | -14% |
(tonnes) | Zinkgruvan | 16,832 | 13,870 | 21% |
Storliden | 2,020 | 3,892 | -48% | |
Galmoy | 11,411 | 7,744 | 47% | |
Total | 34,268 | 30,170 | 14% | |
Lead | Zinkgruvan | 6,646 | 10,960 | -39% |
(tonnes) | Galmoy | 2,997 | 1,411 | 112% |
Total | 9,643 | 12,371 | -22% | |
Nickel | Aguablanca | 1,603 | - | |
(tonnes) | Total | 1,603 | - | |
Silver | Neves-Corvo | 96,991 | 124,705 | -22% |
(ounces) | Zinkgruvan | 314,702 | 603,380 | -48% |
Galmoy | 38,040 | 5,213 | 630% | |
Total | 449,733 | 733,298 | -39% |
3
Results of Operations Sales Total sales increased $111.8 million in the first quarter of
2008 to $305.7 million compared with $193.9 million for the same period in 2007.
This increase was due in part to the $51.3 million in revenue added from the
acquisition of Rio Narceas Aguablanca mine during the third quarter of 2007.
Also contributing to the increase were strong realized metal prices for copper
and lead combined with a return to normalized production levels at Galmoy in the
current year. Offsetting these increases were a reduction in zinc sales due to a
30% reduction in the average price when compared to the same period a year
earlier. Mining Operations Cost of mining operations increased $37.0 million in the
first quarter to $105.0 million compared with $68.0 million for the same period
in 2007. Driving the increase was the additional mining costs related to the
Aguablanca mine acquired in the third quarter of 2007 and the strengthening of
the Euro and Swedish Kronor vis-à-vis the US dollar. Accretion of Asset Retirement Obligations and Other During the first quarter of 2008 accretion of asset
retirement obligation and provision for severance on mine closure totaled $2.4
million compared to $1.1 million for the same period in 2007. Increased
accretion expenses were driven both the strengthening of the Euro and Swedish
Kronor, higher accretion charges at Aljustrel and higher mine closure provisions
at the Companys various operations. Depreciation, Depletion and Amortization Depreciation, depletion and amortization increased $18.1
million to $52.9 million for the first quarter of 2008 compared with $34.8
million for the same period in 2007. This increase was due primarily to
depreciation at the Aguablanca mine, which contributed $17.8 million to the
overall increase in the current period. General Exploration and Project Investigation General exploration and project investigation costs increased
$4.9 million to $10.1 million in the first quarter of 2008 compared with $5.2
million during the same period in 2007. A significant portion of the increase
relates to the increased activities in Portugal and the addition of the Rio
Narcea exploration costs in Spain. Exploration and project investigation costs broken down by
country are as follows: Portugal - $4.9 million, Sweden - $2.8 million, Ireland
- - $1.3 million and Spain - $1.1 million. Selling, General and Administration Selling, general and administration costs were $11.1 million
in the first quarter 2008 compared with $5.4 million during the same period in
2007. This increase was due primarily to severance costs, higher audit and SOX
related costs and the costs of maintaining the U.K. operations office that
opened in the latter part of 2007. The Company had previously announced that several of its
offices will be closed during 2008. It is expected that closure costs and other
re-organisation costs may amount to $20 million and will be weighted towards the
second half of 2008. Costs incurred in the quarter in respect of this, and
included in selling, general and administration costs, amount to $3.4 million. Stock Based Compensation Stock based compensation costs were $4.2 million in the first
quarter 2008 compared with $1.5 million in the same period in 2007. The increase
relates to the amortization of a comprehensive option grant in the third quarter
2007 combined with executive and senior management level options granted during
the current quarter.
4
Foreign Exchange Losses Foreign exchange losses increased in the first quarter of
2007 to $6.2 million compared with a loss of $2.7 million for the same period in
2007. The increase in foreign exchange losses was due primarily to a weakening
US dollar by 15% against the Euro and 11% against the Swedish Krona. Losses on Derivative Instruments Losses on derivative instruments are comprised of realized
and unrealized gains and losses from marking-to-market the Companys outstanding
metal forward sales and metal options contracts. The net loss on derivative
contracts during the first quarter of 2008 was $3.6 million compared with a net
loss of $5.5 million for the same period in 2007. The Company continues to
unwind its current hedge profile, with the current quarter losses driven
primarily by higher lead prices. Current Income Taxes Current income taxes increased $13.5 million to $30.2 million
in the first quarter of 2008 compared with $16.7 million during the same period
in 2007. The increase is related to higher operating profit at the Neves-Corvo
operations.
5
Operations Note: All comments compare the three months ended March 31,
2008 to the corresponding three months in 2007, unless otherwise stated. Zinkgruvan Mine
Three months ended March 31, |
|||||
(100% OF PRODUCTION) | 2008 | 2007 | Change | ||
Ore mined (tonnes) | 243,640 | 224,696 | 8% | ||
Ore milled (tonnes) | 227,647 | 235,390 | -3% | ||
Grades per tonne | |||||
Zinc (%) | 8.5 | 7.7 | 10% | ||
Lead (%) | 4.5 | 4.2 | 7% | ||
Recovery | |||||
Zinc (%) | 94 | 94 | 0% | ||
Lead (%) | 86 | 88 | -2% | ||
Concentrate grade | |||||
Zinc (%) | 53.0 | 53.0 | 0% | ||
Lead (%) | 77.2 | 77.1 | 0% | ||
Production (metal contained) | |||||
Zinc (tonnes) | 18,199 | 17,162 | 6% | ||
Lead (tonnes) | 8,782 | 8,643 | 2% | ||
Silver (oz) | 415,672 | 439,014 | -5% | ||
Sales ($000's) | $ | 48,633 | $ | 49,476 | -2% |
*Cash cost per pound | $ | 0.18 | $ | 0.23 | -22% |
*Cash cost per pound of payable zinc sold is the sum of direct cash costs and inventory changes less by-product credits and profit-based royalties. See Non-GAAP Performance Measures.
Production
The 10% increase in zinc ore head grade is largely due to the stoping sequence planned during this quarter which accessed high grade areas in the Burkland ore body as well as the Nygruvan 260 stope.
The variance of ore mined and milled reflects the replacement of bearings of the autogenous mill this quarter which detracted 50 hours from planned available operating time. The relative drop in lead recovery was essentially caused by an increase in the pyrhotite content in the ore which detrimentally impacted on the separation process between the zinc and the lead.
Health, Safety & Environment
When compared with the first quarter of 2007, the lost time frequency index (LTFI*) dropped by 76% to 1.17. More focus and rigor has been applied to risk assessments and planned inspections.
Cash Costs
Unit cash costs for this quarter declined 22% to $0.18 per pound, due mainly to higher lead by-product credits as average lead prices increased 62% quarter over quarter.
Projects
The copper project (ref. news release of October 5, 2007) is on schedule and within the approved budget of 37 million. In US dollars, the project is presently projected to be US$6.6 million or 18% over budget owing to exchange rate fluctuation.
Mine Geology & Resource Exploration
A total of 4,929 meters has been drilled this quarter on the main license compared to 3,375 meters during the first quarter of 2007. A greater focus has been given to improve our knowledge of the copper resource.
_________________________
*
6
Neves-Corvo Mine
Three months ended March 31, |
||||||
(100% OF PRODUCTION) | 2008 | 2007 | Change | |||
Ore mined, copper (tonnes) | 569,563 | 553,396 | 3% | |||
Ore mined, zinc (tonnes) | 127,321 | 94,200 | 35% | |||
Ore milled, copper (tonnes) | 595,310 | 538,957 | 10% | |||
Ore milled, zinc (tonnes) | 114,896 | 86,966 | 32% | |||
Grade per tonne | ||||||
Copper (%) | 4.4 | 5.0 | -12% | |||
Zinc (%) | 6.6 | 8.8 | -25% | |||
Recovery | ||||||
Copper (%) | 86 | 87 | -1% | |||
Zinc (%) | 77 | 81 | -5% | |||
Concentrate grade | ||||||
Copper (%) | 23.8 | 23.2 | 3% | |||
Zinc (%) | 48.8 | 49.2 | -1% | |||
Production (metal contained) | ||||||
Copper (tonnes) | 22,712 | 23,405 | -3% | |||
Zinc (tonnes) | 5,792 | 6,193 | -6% | |||
Silver (ounces) | 242,737 | 222,792 | 9% | |||
Sales ($000's) | $ | 169,162 | $ | 111,507 | 52% | |
*Cash cost per pound | $ | 1.02 | $ | 0.65 | 57% |
*Cash cost per pound of payable copper sold is the sum of direct cash costs and inventory changes less by-product credits and profit-based royalties. See Non-GAAP Performance Measures.
Production
Higher mill throughput was insufficient to compensate for lower copper and zinc ore grades as well as lower recovery efficiencies, resulting in a drop in copper and zinc metal contained in concentrates production of 3% and 6%, respectively.
Copper grades were lower this year but are in accordance with the annual mine plan. A slight increase in copper ore grades are expected in the second quarter. Overall zinc ore head grades were lower during this quarter with the majority of ore extracted from the drift and fill areas of Neves South which is lower in zinc grade. The zinc ore grades are expected to increase in the later part of the second quarter as new mini bench areas are brought into production in Lower Corvo and Zambujal.
Overall metal recoveries to concentrate were also lower this year. For the copper ores, higher levels of deleterious elements (principally zinc and mercury) detrimentally affected recoveries. The reduction in zinc recovery from 81% to 77%, quarter on quarter, is a direct consequence of the zinc ore grade being 25% lower at 6.6% zinc this quarter.
Health, Safety & Environment
The LTFI improved by 50% to 0.5 this quarter compared with the first quarter in 2007.
Cash Costs
Unit costs reflect a 57% increase in the operating production cost per pound. This is a consequence of a 15% devaluation of the US dollar against the Euro, lower credits from by-products, lower grades and increased prices for consumable items (cement, steel, diesel). By-product credits were lower as zinc sales were down 14% and unsold inventories were higher due to shipment scheduling.
Projects
During the quarter, a new project for recovering zinc and copper metal from the current copper plant tailing was approved by the Board. The project is scheduled for commissioning during the second half of 2009 and is expected to increase total copper recovered to concentrate by 1.5% while also recovering 23% of the zinc contained in the copper ore to a zinc concentrate of 48% zinc grade.
7
The Lombador project study program is generally progressing
as planned. A pre-feasibility study will now be submitted to the Board prior to
awarding the contract for the preparation of a feasibility study to confirm the
selected options. Condemnation drilling has been successfully completed for the
preferred shaft location and the Geotechnical Drilling programme is underway.
On May 5, 2008, the Company announced the construction of an
additional circuit within the existing copper plant at the Neves-Corvo mine in
Portugal to recover copper and zinc currently lost to tailings. The new circuit
will facilitate recovery of a proportion of the zinc and copper bearing minerals
from the tailings stream as well as provide overall improved management of the
mainstream concentrate. Over the life of the mine this project is expected to
produce 9,500 tonnes of payable copper, 29,000 tonnes of payable zinc and
370,000 ounces of payable silver. Mine Geology & Resource Exploration A total of 4,929 meters has been drilled this year to date on
the main license compared to 3,375 meters during the first quarter of 2007. A
greater focus has been given to improve our knowledge of the copper resource. An
additional 6,329 metres of surface exploration drilling was also completed on
the Zinkgruvan mine license during the first quarter. Aguablanca Mine
Three months ended March 31, |
||||||
(100% OF PRODUCTION) |
|
2008 |
|
2007 |
|
Change |
Ore mined (tonnes) |
|
407,229 |
|
427,401 |
|
-5% |
Ore milled (tonnes) |
|
405,373 |
|
406,749 |
|
0% |
Grades per tonne |
|
|
|
|
|
|
Nickel (%) |
|
0.6 |
|
0.5 |
|
4% |
Copper (%) |
|
0.4 |
|
0.5 |
|
-7% |
Recovery |
|
|
|
|
|
|
Nickel (%) |
|
81 |
|
74 |
|
9% |
Copper (%) |
|
93 |
|
91 |
|
2% |
Concentrate grade |
|
|
|
|
|
|
Nickel (%) |
|
7.0 |
|
7.3 |
|
-3% |
Copper (%) |
|
5.9 |
|
7.3 |
|
-19% |
Production (metal contained) |
|
|
|
|
|
|
Nickel (tonnes) |
|
1,848 |
|
1,631 |
|
13% |
Copper (tonnes) |
|
1,548 |
|
1,645 |
|
-6% |
Sales ($000's) |
$ |
51,303 |
$ |
62,661 |
|
-18% |
Cash cost per pound* |
$ |
7.53 |
$ |
9.13 |
|
-18% |
*Cash cost per pound of payable nickel sold is the sum of direct cash costs and inventory changes less by-product credits and profit-based royalties. See Non-GAAP Performance Measures.
The 2007 production sales revenue is shown for comparative purposes only and does not reflect the results of the Company. The Company acquired Rio Narcea Gold Mines, Ltd. (owner of the Aguablanca mine) on July 17, 2007.
Production
The lower ore mined results from efforts being directed towards overcoming the backlog of waste mining, announced on November 13, 2007, which has now been fully recovered. The copper grade dropped owing to the erratic nature of the ore body with its lateral and vertical grade variation which impact on nickel and copper grades.
Health, Safety & Environment
The operation registered a number of minor accidents in January which impacted significantly on its quarter LTFI results. The LTFI rose to 15.8 which was equivalent to an increase of 37%, quarter on quarter. Most of the accidents involved contractors and management is working closely with the contractors to reinforce their respective safety programs and reverse the negative trend of accident frequency.
8
Cash Costs Unit cash costs of nickel fell owing to lower treatment charges and higher
copper by-product credits. These positive effects on cash costs more than offset
the impact of an increase in the stripping ratio from 6.9:1 in the first quarter
of 2007 to 11.9:1 during this quarter. This ratio is not expected to continue as
it reflects the planned "catch up" of waste removal. Projects A feasibility study is presently being undertaken on
undertaking underground mining and this is expected to be completed later this
year. If approved, a plant expansion project will be finalized to cater for the
processing of underground ore. Mine Geology & Resource Exploration Results from the first deep step-out drill hole (AGU-120) to the south were
encouraging; at a down-hole depth of 570 metres, sulphide mineralization was
intersected over 21 metres grading 0.52% nickel, including 5.5 metres grading
1.27% nickel. Galmoy Mine
Three months ended March 31, |
||||||
(100% OF PRODUCTION) |
|
2008 |
|
2007 |
|
Change |
Ore mined (tonnes) |
|
128,410 |
|
92,770 |
|
38% |
Ore milled (tonnes) |
|
130,015 |
|
94,060 |
|
38% |
Grades per tonne |
|
|
|
|
|
|
Zinc (%) |
|
12.9 |
|
12.8 |
|
0% |
Lead (%) |
|
4.1 |
|
3.5 |
|
18% |
Recovery |
|
|
|
|
|
|
Zinc (%) |
|
82 |
|
83 |
|
-1% |
Lead (%) |
|
71 |
|
73 |
|
-4% |
Concentrate grade |
|
|
|
|
|
|
Zinc (%) |
|
52.3 |
|
51.9 |
|
1% |
Lead (%) |
|
63.7 |
|
64.1 |
|
-1% |
Production (metal contained) |
|
|
|
|
|
|
Zinc (tonnes) |
|
13,694 |
|
9,961 |
|
37% |
Lead (tonnes) |
|
3,795 |
|
2,404 |
|
58% |
Silver (ounces) |
|
59,106 |
|
19,022 |
|
211% |
Sales ($000's) |
$ |
26,808 |
$ |
17,752 |
|
51% |
*Cash cost per pound |
$ |
0.69 |
$ |
1.15 |
|
-40% |
*Cash cost per pound of payable zinc sold is the sum of direct cash costs and inventory changes less by-product credits and profit-based royalties. See Non-GAAP Performance Measures.
Production
During the first quarter of 2007 production was significantly affected by industrial action as well as collateral consequences surrounding a fatal accident. This quarter has, by and large, followed the 2008 plan although low capacity in the G zone has been compensated by a higher tonnage from the R and K zones. Grades and recoveries are entirely linked to the mining schedule of different ore bodies. During this quarter a high grade lead stope was mined in the R Zone, resulting in the 18% variance between quarters and the lead/zinc ratio and the copper content in the zinc ore have both been at high levels and thus detrimentally affected metal recoveries. During March of this year, an extended period of high lead grade in zinc ore also negatively impacted on recovery. Due to a lower selectivity in the process, lead concentrates have registered high copper and zinc values, which naturally affected the grade of the lead concentrates.
9
Health, Safety & Environment The LTFI for this quarter was 7.5, which represents a 38% reduction in the
lost time accident frequency rate of 2007. The 12-month rolling average LTFI
shows a decreasing trend. Cash Costs The unit cash cost per pound dropped from $1.15 in the first
quarter of 2007 to $0.71 this quarter. The main reasons for the fall in cash
costs were higher sales volumes, improved terms for treatment charges, and an
increase in by-product contributions from lead and silver sales. Projects Installation of the new Lamella water treatment plant
commenced during this quarter after delays in the engineering phase of the
project. The installation is expected to be commissioned by the third quarter of
this year. Mine Geology & Resource Exploration Infill drilling carried out on the western fringe of the R zone has
intersected low grade zinc-lead sulphide mineralization. Aljustrel Mine Development Project
Three months ended March 31, |
|||||
(100% OF PRODUCTION) |
2008 |
|
2007 |
|
Change |
Ore mined (tonnes) |
234,949 |
|
- |
|
|
Ore milled (tonnes) |
224,526 |
|
- |
|
|
Grades per tonne |
|
|
|
|
|
Zinc (%) |
4.5 |
|
- |
|
|
Recoveries |
|
|
|
|
|
Zinc (%) |
29 |
|
- |
|
|
Concentrate grade |
|
|
|
|
|
Zinc (%) |
47.1 |
|
- |
|
|
Production (metal contained) |
|
|
|
|
|
Zinc (tonnes) |
2,957 |
|
- |
|
|
Production
The ore treatment plant has produced its first saleable zinc concentrate and the first shipment took place in March. Management are now focusing their efforts on improving the recovery of zinc metal to concentrate.
Since the plant started treatment on January 11, 2008, the throughput rose from 85 tonnes per hour to 140 tonnes per hour on February 28, and this level was maintained throughout March. With the full installation of the zinc line in April, recoveries are expected to improve and the throughput is planned to rise progressively to 226 tonnes per hour by year-end. Zinc recoveries have been slightly lower than planned; however, they reflect the interim start-up processing system which utilized the lead flotation circuit whilst awaiting the commissioning of the remaining zinc circuit.
Zinc metal production guidance given to the market at the beginning of this year has been adjusted down by 3% on the basis of this quarters results at the Aljustrel mine.
In the Moinho ore body, stope blasting commenced in January. During the quarter, the definition drilling program was completed and the block model for Moinho updated for copper and zinc reserves.
At the Feitais ore body, ramp development reached a depth of 230 meters. Management expects to bring forward by twelve months the production of zinc and lead concentrates stemming from the Feitais ore body, which was originally scheduled for the second half of 2009. Ore from the Feitais ore body is known for its higher content of recoverable lead and silver, which will provide by-product credits.
10
The majority of poly metallic base metal projects
commissioned over the past 15 years have not achieved the design capacity within
the first year of operation due to a variety of unforeseen issues. Nevertheless,
commercial production is expected to begin in the third quarter of 2008 and the
operation is still scheduled to reach full production during the first quarter
of 2009 at a combined rate of 80,000 tonnes of contained zinc, 17,000 tonnes of
contained lead and 1.25 million ounces of silver. Health, Safety & Environment The operation registered an LTFI of 2.7 for the quarter,
which represents a 60% improvement on the first quarter results in 2007.
Management continue to invest in focused training programs for Aljustrel
employees and contractors have made a notable effort to enhance their safety
performance. Storliden Mine
Three months ended March 31, | ||||||
(100% OF PRODUCTION) |
|
2008 |
|
2007 |
|
Change |
Ore mined (tonnes) |
|
72,550 |
|
76,818 |
|
-6% |
Ore milled (tonnes) |
|
81,039 |
|
64,547 |
|
26% |
Grades per tonne |
|
|
|
|
|
|
Copper (%) |
|
0.9 |
|
2.0 |
|
-54% |
Zinc (%) |
|
3.2 |
|
7.6 |
|
-58% |
Recovery |
|
|
|
|
|
|
Copper (%) |
|
91 |
|
92 |
|
-1% |
Zinc (%) |
|
90 |
|
93 |
|
-3% |
Concentrate grade |
|
|
|
|
|
|
Copper (%) |
|
28.5 |
|
29.2 |
|
-3% |
Zinc (%) |
|
52.9 |
|
54.8 |
|
-3% |
Production (metal contained) |
|
|
|
|
|
|
Copper (tonnes) |
|
680 |
|
1,198 |
|
-43% |
Zinc (tonnes) |
|
2,377 |
|
4,578 |
|
-48% |
Sales ($000's) |
$ |
9,779 |
$ |
15,544 |
|
-37% |
*Cash cost per pound |
$ |
(0.11) |
$ |
0.09 |
|
-222% |
*Cash cost per pound of payable zinc sold is the sum of direct cash costs and inventory changes less by-product credits and profit-based royalties. See Non-GAAP Performance Measures.
Production
The copper and zinc ore grades were much lower reflecting managements decision to take advantage of current metal prices and optimize metal recovery in areas not contemplated in this years mine plan. Ore grades are expected to rise in the second and last planned quarter of production at this mine.
Health, Safety & Environment
Since commissioning in 2002, the mine has registered only one accident with lost time. During the quarters being compared no lost time accidents were reported.
Cash Costs
The unit cash cost per pound of payable metal sold is significantly lower this quarter than during the same period in 2007 mainly due to higher contributions from the copper by-product credits.
Mine Geology & Resource Exploration
A limited number of infill holes are being drilled in an area close to the ramp system which could potentially provide additional ore for the stoping crews as they enter their final exit sequence from the mine.
11
Project Highlights
Ozernoe Project
Feasibility study work on the Ozernoe project in the Republic of Buryatia, Eastern Siberia, Russia progressed during the first quarter 2008. Priorities included mineral resource and ore reserve modeling, plant throughput optimization studies, process test work and plant flow sheet development, and investigations related to power and transport infrastructure needs. Mine and pre-stripping design progressed to support an application to Russian authorities for a test mining program. Environmental and social impact assessments also advanced during the quarter as did overall project execution planning.
A new Project Director was retained and commenced work in February to lead the project forward. There are a number of challenging issues being addressed on the project including renegotiation of certain milestones contained within the original mineral license. These milestones need to be extended and while there is no indication that such extensions will not be given, there is no guarantee that these extensions will be granted.
A new "strategic sector investment policy" affecting natural resource development in Russia has now passed through the 2nd reading of 3 stages. This new policy has potentially far reaching affects on mining project developments for deposits of the scale of Ozernoe. The Company is following this issue closely. Partner discussions are ongoing related to the needed license revisions, shareholders terms, project organization, study and project funding realities and other important project issues. The Company has initiated a review of whether evolving investment terms, license amendment progress, and local issues meet the Companys criteria for ongoing involvement.
Tenke Fungurume Project
Under the direction of operating partner Freeport McMoRan Copper and Gold Inc., construction progress improved during the first quarter 2008 for the world class Tenke Fungurume copper-cobalt deposit in southern Katanga Province, Democratic Republic of Congo ("DRC"). The first phase of production facilities is designed to produce 115,000 tonnes per annum of copper cathode and a minimum 8,000 tonnes per annum of cobalt in hydroxide and cathode metal.
By the end of the quarter, critical site activities including certain civil works and concrete installation was being performed on a 24 hour basis. Progress was also made on camp expansions, villager relocation, permanent housing construction, shop building erection, process pipe rack installation, and process plant tank stainless steel tank erection. Owners site and the construction management teams were expanded significantly to manage increased levels of activity. Pre-stripping of the Kwatebala deposit and ore stockpiling advanced with excellent progress, and operator training of Congolese nationals at Freeports Arizona and South American operations was initiated. At the end of the quarter, approximately 80% of design engineering and 90% of equipment purchases were completed. Construction progress exceeded the 25% completion point, supported by a construction work force in excess of 2,000 workers. Site safety performance has been excellent to date, with in excess of 2.8 million manhours achieved without a lost time accident.
In parallel, a major power refurbishment project is in progress, advancing commitments by the Tenke project to rebuild all the generators at the Nseke Power Station, west of the Tenke Fungurume concessions towards Kolwezi. This investment, spanning a 5 year period will provide a dramatic improvement to the regional power infrastructure and provide power for significant expansions of production at Tenke Fungurume. During the quarter the project also invested in national highway upgrades between Tenke Fungurume and Likasi to maintain regional traffic during the rainy season. Related to social investment, more than 20 micro enterprise businesses are functioning aided by project funding to kick start local entrepreneurial developers in the area, and the Tenke Fungurume project is assisting, along with a consortium of other regional mine developers and the Lundin for Africa Foundation, in the refurbishment of the Mutoshi Vocational Training School in Kolwezi.
During the quarter, Freeport performed an overall review of project costs and in April, Freeport advised the Company that the expected capital costs of the project are now forecast to be materially above their previous forecasts which were estimated in October 2007 to be $900 million ($1 billion including advances to a third party for the refurbishment of provincial power facilities). Approximately $475 million in project costs have been incurred to date.
12
The recent capital cost review indicates estimated capital costs of approximately $1.75 billion, (approximately $1.9 billion including loans to a third party for power development). These estimates include substantial amounts for infrastructure to support a larger scale operation than the initial phase of the project. This includes the provision of expanded power generating capacity. This regional power infrastructure investment is now estimated to be in the range of US$175 million, the majority of which is expected to be funded through a loan to the DRC State power authority.
The latest capital cost estimates include: provision for expanded housing and support facilities for the project work force; enhancements to national roads and bridges; extended social and training initiatives. The latest estimates also reflect substantial industry-wide escalation in construction costs and the incremental costs to develop the project in Central Africa, where infrastructure and logistics are challenging in developing a green field project.
Freeport is responsible for funding 70 percent of the project development costs and is also responsible for financing Lundin Minings share of certain project cost overruns. Hence, the funding of the majority of this increase is covered by overrun protection from Freeport and the Company does not expect this to have a material impact on our cash flow through to start-up.
The Company has previously indicated that it expected its contribution to the Tenke Project to be in the range of $150 million to $180 million in 2008. This is now expected to be in the range of $180 million to $210 million.
Freeport is currently reviewing the latest cost estimates with its partners and will strive to enhance the economic returns of the project while progressing its plans for developing infrastructure in the area that will enable rapid expansion of this high potential resource.
First copper production is expected in the second half of 2009. Estimated cost of the project continues to be tracked closely by Freeport to mitigate risks of further increase; however, these can not be ruled out.
On February 19, 2008, the Company received a letter from the Ministry of Mines, Government of the Democratic Republic of Congo pertaining to the review of mining contracts in the country. The letter was addressed to Tenke Fungurume Mining S.A.R.L. ("TFM") the entity which is developing the mine and in which the Company has an equity investment of 24.75%. Management believes that its agreements with the government of DRC are legally binding, that all associated issues have been dealt with fully under Congolese law and that the overall fiscal terms previously negotiated and incorporated into the Amended and Restated Mining Convention exceed the requirements of the Congolese Mining Code. Meetings have been held with DRC Government officials and TFM are cooperating fully with requisite authorities respecting the need for transparency and constructive dialogue to aid in the completion of the contract review process in a successful, timely manner.
Neves-Corvo Lombador Zinc Project
During the first quarter 2008, drilling continued to assist in new shaft studies, and for infill and mineral resource assessments. Metallurgical test work also advanced, and requests for proposals were issued to international consultants for shaft and winder studies, and for the overall Lombador feasibility study. Comparison of various development options to pre-feasibility study level are planned for the second quarter, and depending on results, the intent is to have a full feasibility study advanced immediately upon confirming the preferred development scenario. Subject to successful study results and future Board decisions, the objective is to start mining Lombador in late 2011 or early 2012.
13
Zinkgruvan Copper Project
Incline ramp development progresses at Zinkgruvan to facilitate development of a copper deposit lying adjacent to one of Zinkgruvans zinc deposits in Sweden. In addition to facilitating copper production, this expansion is intended to improve zinc mining flexibility through both a second underground crusher and ramp access down through the Cecilia west deposits. Ramp construction and underground drifting is progressing on schedule. During the quarter a process plant package was negotiated and long delivery equipment is on order. The objective for first copper production from the Zinkgruvan copper deposit is 2010.
Exploration Highlights
Portugal
Neves-Corvo Mine Exploration (Copper, Zinc)
A total of 12,159 metres of surface drilling was completed at Neves-Corvo in first quarter 2008 which included:
* estimated true width
Aljustrel Mine Exploration (Copper, Zinc)
Exploration drilling at Aljustrel resumed in March with a total of 941m drilled during the reporting period. The initial focus of this program is to expand and upgrade the present inferred copper resource at the Feitais deposit to the indicated resource category. During the quarter, final assay results from the 2007 drill program were received. Significant intersections from the 2007 program include:
* estimated true width
14
Iberian Pyrite Belt, southern Portugal (Copper, Zinc)
A total of 778 metres of greenfields exploration drilling was carried out in first quarter 2008 in the historic Montinho mine area located 13 km southwest of Aljustrel and tested two transient electromagnetic ("TEM") geophysical anomalies, the most interesting of which is located down-dip of known massive sulphide mineralization. No significant mineralization was encountered; the cause of the TEM anomalies has been interpreted to be conductive graphitic sedimentary rocks that were intersected.
TEM surveying was also conducted in first quarter 2008 on several regional targets comprised of coincident gravimetric geophysical anomalies and favourable geology, focusing on areas within the Castro Verde exploration permit and the Neves Corvo mine lease.
Spain
Aguablanca Mine Exploration (Nickel, Copper)
Drilling completed during first quarter 2008 at Aguablanca totaled 2,209 metres including 973 metres of in-fill resource definition drilling and 1,236 metres of step-out exploration drilling. An additional drill rig was mobilized in March to speed up progress and to execute a series of deep step-outs to the south of the known deposit. A total of four drill rigs are now fully operating on the mine site.
The exploration campaign in first quarter 2008 was focused on:
Step-out exploration drilling is testing for a southern extension of the orebody that is bounded to the south by a thick, faulted, unmineralized intrusion. Results from the first deep step-out drill hole (AGU 120) to the south of this intrusive were encouraging; at a down-hole depth of 570 metres, strong sulphide mineralization was intersected over 21 metres grading 0.52% nickel including 5.5 metres grading 1.27% nickel. This significant drill intersection is located approximately 200 metres horizontally from the nearest previously known resource mineralization. Step-out drilling will continue in the second quarter.
Ossa Morena Regional Exploration, southern Spain (Nickel, Copper, PGM)
A total of 327 metres in two drill holes was completed at the Cortegana nickel-copper target area. Broad zones of low-grade, disseminated sulphide mineralization (46.35m grading 0.14% nickel) were encountered that could represent the outer halo of a higher grade Aguablanca-type breccia zone. Reconnaissance drilling was also initiated at the Pequeño Buda nickel-copper prospect. This target area has not previously been drilled; it is characterized by a strong copper/nickel-in-soil geochemical anomaly coincident with a series of mafic/ultramafic bodies intruding into lower Paleozoic metasediments.
Regional targeting efforts continued in first quarter 2008 with assessment of the results of the airborne Geotech VTEM survey completed in fourth quarter 2007 in addition to prospecting and mapping of the most prospective target areas.
15
Toral Project, northwest Spain (Zinc, Lead, Silver)
Planned drilling at the Toral property was completed in first quarter 2008. The final hole, targeting the deep, down-dip extension of the historic resource, was stopped at the final depth of 1287.2m. Unfortunately the hole failed to intersect the target zone because of a wide fault zone that was encountered towards the bottom of the hole. No additional drilling is planned for second quarter 2008.
Ireland
Galmoy Mine Exploration (Zinc, Lead)
Exploration drilling was significantly reduced at the end of first quarter 2008. During the quarter the lateral extent of the M-Zone was further defined and significant yet narrow intersections of zinc mineralization were encountered at the western fringe of the R Orebody.
Longford Block - Keel (Zinc, Lead)
The Keel property is located in Longford County, Ireland. Drilling is focused on locating satellite deposits in the vicinity of the Keel zinc-lead deposit. No significant mineralization was intersected within the five holes drilled in the first quarter. Additional target generation work is planned for second quarter 2008.
West Limerick (Zinc, Lead)
The license is located approximately 80 km west of the Galmoy Mine. The drill program was finished with three holes completed and no significant mineralization detected. Additional target generation work is planned for second quarter 2008.
Sweden
Zinkgruvan Mine Exploration (Zinc, Lead, Silver)
The objectives for the quarter were to better drill-define the mineralized zones previously encountered within the deep Dalby target area and to confirm the extension of the Zinkgruvan mine stratigraphy into the Finnafalet target area. Both areas are located northwest of the mine. The drilling at Dalby has shown that the high-grade Dalby mineralized horizon extends to the north but is more structurally complex than previously thought. Within the Finnafallet area, drilling has shown that the mine horizon extends to the north of the mine although no significant mineralization has been encountered to date. Exploration drilling will continue next quarter. Underground exploration drifting continued as planned.
Bergslagen Regional Exploration, southern Sweden (Zinc, Lead, Silver)
Systematic testing of regional targets continued in the first quarter with the objective of finding new zinc-lead-silver deposits that can represent additional feed for the Zinkgruvan mill. Geophysical surveys and then drilling were completed at the Tvistbo, Högfors, Lindbastmora, Stora Krigstjärn and Viker target areas. Additional resource-grade sulphide mineralization was intersected at Tvistbo. More regional drilling is planned for the second quarter.
Skellefte Regional Exploration, northern Sweden (Copper, Zinc)
Exploration in this area was curtailed in the final quarter of last year. Offers from interested parties are being considered with the objective of finalizing an agreement by mid-year. A purchase-sale agreement for the Norrliden Project is planned for completion early in the second quarter.
16
Metal prices, LME inventories and smelter treatment and refining charges
During the first quarter 2008, the average prices for zinc, lead and nickel decreased by 8%, 11% and 2%, respectively, compared to the fourth quarter 2007. During the same period, the copper price increased by 7%. The inventory levels of zinc, lead and nickel on the London Metal Exchange ("LME") all increased during the first quarter 2008 compared to the fourth quarter 2007. At the end of the first quarter 2008, the LME stocks of zinc were 124,375 tonnes (Q4: 89,150 tonnes), lead 49,050 tonnes (Q4: 45,475 tonnes) and nickel 49,866 tonnes (Q4: 47,946 tonnes). The LME inventory for copper, on the other hand, decreased substantially during the first quarter 2008 and ended the quarter at 112,500 tonnes (Q4: 197,450 tonnes).
Three months ended March 31, |
||||
(Average LME Prices) | 2008 | 2007 | Change | |
Zinc | US$/pound | 1.10 | 1.57 | -30% |
US$/tonne | 2,426 | 3,460 | -30% | |
Lead | US$/pound | 1.31 | 0.81 | 62% |
US$/tonne | 2,891 | 1,787 | 62% | |
Copper | US$/pound | 3.52 | 2.69 | 31% |
US$/tonne | 7,763 | 5,941 | 31% | |
Nickel | US$/pound | 13.09 | 18.80 | -30% |
US$/tonne | 28,863 | 41,448 | -30% |
During the quarter there has been very little spot activity in the zinc concentrates market outside China. The negotiations of the treatment charge for the annual contracts between miners and smelters are ongoing but so far there has been no major settlements. However, the general view is that the terms will improve in favor of the zinc smelters.
The spot treatment charge for copper concentrates dropped during the first quarter 2008 to $9 per dry metric tonne ("dmt") of concentrates at the end of the quarter with a refining charge of $0.009 per payable pound of copper contained. This should be compared with the spot treatment and refining charges at the end of 2007 of $46 per dmt and $0.046 per payable pound copper contained respectively. The annual negotiations of copper concentrates terms between miners and smelters for 2008 settled at a treatment charge of $45 per dmt of concentrates and an refining charge of $0.045 per payable pound of copper contained, an improvement in favor of the miners compared to 2007. Furthermore, the annual settlement did not include any price participation, a mechanism of price sharing whereby the refining charge increases in favor of the smelter as the copper price increases.
In the lead concentrates market there has been very little spot activity outside China. Most of the annual contracts for 2008 have been settled but there is no clear benchmark and the level of the treatment charge varies with the complexity of the qualities of lead concentrates. The level of terms in Europe for 2008 is in the range of $310-$350 per dmt of concentrates based on a lead price of $2,500 per metric tonne and with an upward escalation of $0.10 per dmt of concentrates for each $1 per metric tonne increase in the lead price above $2,500. The downward escalator is $0.05 per dmt for each $1 per metric tonne decrease in the lead price below $2,500. This is an improvement in favor of the smelters compared to the terms for 2007.
The Companys nickel concentrates are sold under multi-year contracts and will not be affected by this increase.
17
Currencies
Three months ended March 31, |
|||
(Average Exchange Rates) | 2008 | 2007 | Change |
SEK/US$ | 6.27 | 7.01 | 11% |
SEK/Cdn$ | 6.25 | 5.98 | -5% |
Cdn$/US$ | 1.00 | 1.17 | 15% |
US$/Euro | 1.50 | 1.31 | -15% |
Liquidity and Capital Resources
Cash Resources
The Company has cash and cash equivalents of $92.6 million as at March 31, 2008 compared with $133.2 million as at December 31, 2007, a decrease of $40.6 million for the quarter. The decrease was due primarily to funding $42 million for the Tenke project, payments of $18 million for treasury shares purchased in the open market, $65.9 million of current taxes paid, and $79.3 million of capital expenditures and capitalized pre-operating costs. These uses of cash were offset by a $95.9 million drawdown on the credit facility and $139.9 million net cash generated from operating activities before working capital changes and reclamation payments. The Company expects that cash flow from operating activities will increase significantly during the second quarter 2008 compared with the first quarter 2008.
During the first quarter of 2008 the Company drew a further $95.9 million on the $575 million revolving credit facility, increasing the total outstanding on the facility to $135.2 million as at March 31, 2008.
Equity Capital Resources
Shareholders equity at March 31, 2008 was $3,750.0 million, an increase of $310.0 million for the first quarter. This increase was due primarily to $139.2 million increase in other comprehensive income, driven by increase of $167.6 million in cumulative translation adjustments from a strong Euro and Swedish Krona where the companys operating assets are held. As part of the normal course issuer bid, the Company made purchases of $14.7 million during the first quarter at an average price of CAD $8.59 per shares.
Hedging
The Company enters into derivative contracts for the purpose of managing risks and not for trading purposes. As at March 31, 2008, the liability on marking-to-market the outstanding derivative contracts was $9.8 million. The Company has not entered into any metal or foreign exchange hedges during the first quarter.
Critical Accounting Estimates
The Companys accounting policies are described in Note 3 of the annual consolidated financial statements for the year ended December 31, 2007. For a complete discussion of those policies deemed most critical by the Company, refer to the Companys 2007 annual MD&A, available on the SEDAR website, www.sedar.com.
Changes in Accounting Policies
Effective for the first quarter beginning on January 1, 2008, the Company has adopted Sections 1535, 3031 and 3862 of the CICA Handbook, "Capital Disclosures", "Inventories" and "Financial Instruments Disclosures".
Section 1535, Capital Disclosures establishes standards for disclosing quantitative and qualitative information about the Companys capital and how it is managed, thereby enabling users to evaluate the Companys objectives, policies and processes for managing capital.
18
Section 3031, Inventories prescribes the accounting treatment for inventories and provides guidance on the determination of costs and its subsequent recognition as an expense, including any write-down to net realizable value. It also provides guidance on the cost formulas that are used to assign costs to inventories.
Section 3862, Financial Instruments Disclosures requires additional disclosure of the significance of financial instruments to the Companys financial position and performance as well as quantitative and qualitative information that enable users to evaluate the nature and extent of risks arising from those financial instruments.
The adoption of these new handbook sections did not result in any changes to the Companys current period earnings nor did they require any adjustment to the opening balances; rather, they provided additional disclosure in the notes to the financial statements.
International Financial Reporting Standards ("IFRS")
In 2006, the Canadian Accounting Standards Board ("AcSB") published a new strategic plan that will significantly affect financial reporting requirements for Canadian companies. The AcSB strategic plan outlines the convergence of Canadian GAAP with IFRS over an expected five year transitional period.
In February 2008 the AcSB announced that 2011 is the changeover date for publicly-listed companies to use IFRS, replacing Canada's own GAAP. The date is for interim and annual financial statements relating to fiscal years beginning on or after January 1, 2011. The transition date of January 1, 2011 will require the restatement for comparative purposes of amounts reported by the Company for the year ended December 31, 2010.
Risks and Uncertainties
The operations of Lundin Mining involve certain significant risks, including but not limited to credit risk, foreign exchange risk, and derivative risk. For a complete discussion of the aforementioned risks, refer to the Companys 2007 Annual Information Form, available on the SEDAR website, www.sedar.com and specific qualifications, if any, included in the management discussions regarding each mine and project in this document. Additionally, refer to Notes 12 and 13 in the interim consolidated financial statements for the quarter ended March 31, 2008 for an expanded discussion of these risks.
Reclamation Fund
As at March 31, 2008, the Company had $64.6 million in a number of reclamation funds that will be used to fund future site restoration and mine closure costs at the Companys various mine sites. The Company will continue to contribute annually to these funds based on an estimate of the future site restoration and mine closure costs as detailed in the closure plans. Changes in environmental laws and regulations can create uncertainty with regards to future reclamation costs and affect the funding requirements.
Outstanding share data
As at May 14, 2008, the Company had 390,413,431 common shares issued and outstanding and 6,988,868 stock options and 306,720 stock appreciation rights outstanding under its stock-based incentive plans.
Non-GAAP Performance Measures
Zinc, copper and nickel cash production cost (US$-pound) are key performance measures that management uses to monitor performance. Management uses these statistics to assess how well the Companys producing mines are performing compared to plan and to assess overall efficiency and effectiveness of the mining operations. These performance measures have no meaning within Canadian Generally Accepted Accounting Principles ("GAAP") and, therefore, amounts presented may not be comparable to similar data presented by other mining companies. The data is intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with Canadian GAAP.
19
Reconciliation of unit cash costs of payable copper, zinc and nickel metal sold to the consolidated statements of operations
(Unaudited, in thousands of US dollars, except zinc, copper and nickel cash production cost per pound)
Zinkgruvan |
Storliden |
Galmoy |
||||||||||
Three months ended March 31, | ||||||||||||
Zinc |
|
2008 |
|
2007 |
|
2008 |
|
2007 |
|
2008 |
|
2007 |
Operating expenses, excluding depreciation |
$ |
15,315 |
$ |
13,377 |
$ |
6,101 |
$ |
7,688 |
$ |
16,743 |
$ |
12,750 |
Treatment charges |
|
10,924 |
|
13,755 |
|
1,405 |
|
3,764 |
|
8,805 |
|
9,092 |
By-product credits |
|
(19,711) |
|
(19,969) |
|
(6,247) |
|
(6,813) |
|
(7,746) |
|
(2,180) |
Other items affecting cash production costs |
|
- |
|
- |
|
(1,746) |
|
(3,850) |
|
(495) |
|
- |
Total |
$ |
6,528 |
$ |
7,163 |
$ |
(487) |
$ |
789 |
$ |
17,307 |
$ |
19,662 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Zinc metal payable (tonnes) |
|
16,832 |
|
13,870 |
|
2,020 |
|
3,892 |
|
11,411 |
|
7,744 |
Zinc metal payable (000's pounds) |
|
37,098 |
|
30,569 |
|
4,452 |
|
8,578 |
|
25,150 |
|
17,068 |
Zinc cash production cost per |
|
|
|
|
|
|
|
|
|
|
|
|
pound payable metal sold |
$ |
0.18 |
$ |
0.23 |
$ |
(0.11) |
$ |
0.09 |
$ |
0.69 |
$ |
1.15 |
Neves-Corvo
|
Three months ended |
|||
|
March 31, |
|||
Copper |
|
2008 |
|
2007 |
Operating expenses, excluding depreciation |
$ |
44,116 |
$ |
33,813 |
Treatment charges |
|
8,643 |
|
11,539 |
By-product credits |
|
(8,369) |
|
(12,177) |
Other items affecting cash production costs |
|
(4,981) |
|
(5,979) |
Total |
$ |
39,409 |
$ |
27,196 |
|
|
|
|
|
Copper metal payable (tonnes) |
|
17,506 |
|
18,899 |
Copper metal payable (000's pounds) |
|
38,583 |
|
41,653 |
Copper cash production cost per |
|
|
|
|
pound payable metal sold |
$ |
1.02 |
$ |
0.65 |
|
|
|
|
|
|
|
|
|
|
Aguablanca |
|
|
|
|
|
Three months ended |
|||
|
March 31, |
|||
Nickel |
|
2008 |
|
2007* |
Operating expenses, excluding depreciation |
$ |
22,714 |
$ |
11,758 |
Treatment charges |
|
19,216 |
|
26,680 |
By-product credits |
|
(15,326) |
|
(10,000) |
Other items affecting cash production costs |
|
- |
|
952 |
Total |
$ |
26,604 |
$ |
29,390 |
|
|
|
|
|
Nickel metal payable (tonnes) |
|
1,603 |
|
1,460 |
Nickel metal payable (000's pounds) |
|
3,533 |
|
3,218 |
Nickel cash production cost per |
|
|
|
|
pound payable metal sold |
$ |
7.53 |
$ |
9.13 |
* Includes pre-acquisition statistics.
Reconciliation of realized prices
Three months ended March 31, 2008 | ||||||||
($ millions) |
|
Copper |
|
Zinc |
|
Nickel |
|
Lead |
Invoiced sales |
$ |
151.8 |
$ |
83.5 |
$ |
46.0 |
$ |
28.9 |
Pricing adjustments |
|
36.7 |
|
- |
|
9.2 |
|
2.0 |
Sales before TC/RC |
$ |
188.5 |
$ |
83.5 |
$ |
55.2 |
$ |
30.9 |
|
|
|
|
|
|
|
|
|
Payable Metal (tonnes) |
|
19,431 |
|
34,268 |
|
1,603 |
|
9,643 |
|
|
|
|
|
|
|
|
|
Realized prices, $ per pound |
|
4.40 |
|
1.11 |
|
15.62 |
|
1.45 |
Realized prices, $ per tonne |
|
9,701 |
|
2,437 |
|
34,435 |
|
3,204 |
20
Outstanding receivables (provisionally valued) as of March 31, 2008
Tonnes payable | Valued at | ||
metal | price per tonne | ||
Copper | 9,755 | $ | 8,431 |
Zinc | 26,060 | $ | 2,342 |
Nickel | 1,902 | $ | 29,983 |
Lead | 4,435 | $ | 2,793 |
Managements Report on Disclosure Controls and Procedures
The Companys management is responsible for establishing and maintaining disclosure controls and procedures. Other than the hiring of Phil Wright as the Company President and CEO in January 2008, there have been no changes in the Companys disclosure controls and procedures during the three months ended March 31, 2008 that have materially affected, or are reasonably likely to materially affect the Companys disclosures.
Managements Report on Internal Control over Financial Reporting
The Companys management is responsible for establishing and maintaining adequate internal controls over financial reporting. Any system of internal control over financial reporting, no matter how well designed, has inherent limitations. Therefore, even those systems determined to be effective can provide only reasonable assurance with respect to financial statement preparation and presentation. Other than the hiring of Phil Wright as the Company President and CEO in January 2008, there have been no changes in the Companys internal control over financial reporting during the three months ended March 31, 2008 that have materially affected, or are reasonably likely to materially affect, internal control over financial reporting.
CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION
Certain of the statements made and information contained herein is "forward-looking information" within the meaning of the Ontario Securities Act or "forward-looking statements" within the meaning of Section 21E of the Securities Exchange Act of 1934 of the United States. Forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to differ from those reflected in the forward-looking statements, including, without limitation, risks and uncertainties relating to foreign currency fluctuations; risks inherent in mining including environmental hazards, industrial accidents, unusual or unexpected geological formations, ground control problems and flooding; risks associated with the estimation of mineral resources and reserves and the geology, grade and continuity of mineral deposits; the possibility that future exploration, development or mining results will not be consistent with the Companys expectations; the potential for and effects of labour disputes or other unanticipated difficulties with or shortages of labour or interruptions in production; actual ore mined varying from estimates of grade, tonnage, dilution and metallurgical and other characteristics; the inherent uncertainty of production and cost estimates and the potential for unexpected costs and expenses, commodity price fluctuations; uncertain political and economic environments; changes in laws or policies, foreign taxation, delays or the inability to obtain necessary governmental permits; and other risks and uncertainties, including those described under Risk Factors Relating to the Companys Business in the Companys Annual Information Form and in each management discussion and analysis. Forward-looking information is in addition based on various assumptions including, without limitation, the expectations and beliefs of management, the assumed long term price of copper, lead, nickel, cobalt and zinc; that the Company can access financing, appropriate equipment and sufficient labour and that the political environment in the countries where the Company has its mining operations and projects in will continue to support the development and operation of mining projects. Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking statements. Accordingly, readers are advised not to place undue reliance on forward-looking statements.
Other Information
Additional information regarding the Company is included in the Companys Annual Information Form ("AIF") and Annual Report on Form 40-F, which are filed with the Canadian securities regulators and the United States Securities and Exchange Commission ("SEC"), respectively. A copy of the Companys AIF is posted on the SEDAR website at www.sedar.com. A copy of the Form 40-F can be obtained from the SEC website at www.sec.gov.
21
Form 52-109F2 Certification of Interim Filings
I, Philip J. Wright, Chief Executive Officer of Lundin Mining Corporation, certify that:
1.
I have reviewed the interim filings (as this term is defined in Multilateral Instrument 52-109 Certification of Disclosure in Issuers Annual and Interim Filings) of Lundin Mining Corporation (the issuer) for the interim period ending March 31, 2008;
2.
Based on my knowledge, the interim filings do not contain any untrue statement of a material fact or omit to state a material fact required to be stated or that is necessary to make a statement not misleading in light of the circumstances under which it was made, with respect to the period covered by the interim filings;
3.
Based on my knowledge, the interim financial statements together with the other financial information included in the interim filings fairly present in all material respects the financial condition, results of operations and cash flows of the issuer, as of the date and for the periods presented in the interim filings;
4.
The issuers other certifying officers and I are responsible for establishing and maintaining disclosure controls and procedures and internal control over financial reporting for the issuer, and we have:
(a)
designed such disclosure controls and procedures, or caused them to be designed under our supervision, to provide reasonable assurance that material information relating to the issuer, including its consolidated subsidiaries, is made known to us by others within those entities, particularly during the period in which the interim filings are being prepared; and
(b)
designed such internal control over financial reporting, or caused it to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with the issuers GAAP; and
5.
I have caused the issuer to disclose in the interim MD&A any change in the issuers internal control over financial reporting that occurred during the issuers most recent interim period that has materially affected, or is reasonably likely to materially affect, the issuers internal control over financial reporting.
Date: May 14, 2008
"PJ Wright"
Philip J. Wright
Chief Executive Officer
Form 52-109F2 Certification of Interim Filings
I, Anders Haker, Chief Financial Officer of Lundin Mining Corporation, certify that:
1.
I have reviewed the interim filings (as this term is defined in Multilateral Instrument 52-109 Certification of Disclosure in Issuers Annual and Interim Filings) of Lundin Mining Corporation (the issuer) for the interim period ending March 31, 2008;
2.
Based on my knowledge, the interim filings do not contain any untrue statement of a material fact or omit to state a material fact required to be stated or that is necessary to make a statement not misleading in light of the circumstances under which it was made, with respect to the period covered by the interim filings;
3.
Based on my knowledge, the interim financial statements together with the other financial information included in the interim filings fairly present in all material respects the financial condition, results of operations and cash flows of the issuer, as of the date and for the periods presented in the interim filings;
4.
The issuers other certifying officers and I are responsible for establishing and maintaining disclosure controls and procedures and internal control over financial reporting for the issuer, and we have:
(a)
designed such disclosure controls and procedures, or caused them to be designed under our supervision, to provide reasonable assurance that material information relating to the issuer, including its consolidated subsidiaries, is made known to us by others within those entities, particularly during the period in which the interim filings are being prepared; and
(b)
designed such internal control over financial reporting, or caused it to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with the issuers GAAP; and
5.
I have caused the issuer to disclose in the interim MD&A any change in the issuers internal control over financial reporting that occurred during the issuers most recent interim period that has materially affected, or is reasonably likely to materially affect, the issuers internal control over financial reporting.
Date: May 14, 2008
"Anders Haker"
Anders Haker
Chief Financial Officer
SUPPLEMENTARY INFORMATION
Significant differences between Canadian Generally Accepted Accounting Principles ("Canadian GAAP") and International Financial Reporting Standards ("IFRS") -International Accounting Standards ("IAS").
The shares of Lundin Mining trade on the Toronto Stock Exchange and the New York Stock Exchange, and Lundin Minings Swedish Depository Receipts trade on the OMX Nordic Exchange ("OMX") in Stockholm. Most companies that trade on the OMX are required to report according to IFRS/IAS. However, as a Canadian company, Lundin Mining is required to report according to Canadian GAAP. The Company has reviewed the differences between Canadian GAAP and IFRS/IAS and has identified the following items which would or may have a significant impact on the financial statements of Lundin Mining.
Under IFRS 3, future costs such as restructuring charges, which are expected to occur subsequent to an acquisition, should not be provided for in the purchase price allocation. Instead, these costs should be realized in the income statement when the costs actually occur. However, under Canadian GAAP, restructuring costs that are expected to occur as a result of an acquisition should be provided for in the purchase price allocation. Restructuring costs that arose during 2007, as a result of the acquisition of Rio Narcea, in the amount of $3 million, have been provided for in the purchase price allocation.
According to Canadian GAAP, impairment test of assets should be carried out by comparing the future cash flows of the assets to their carrying values. Future cash flows are dependent on a number of assumptions, including, among other things, future metal prices, exchange rates and discount rates. According to Canadian GAAP, future cash flows should be based on undiscounted values. Lundin Mining estimates that the future cash flows from the Companys assets exceed their carrying values and, accordingly, no write downs are necessary. According to IAS 36, the future cash flows would be based on discounted values. Under IFRS, no impairment charge would be required.
Under Canadian GAAP, when an asset is acquired other than in a business combination and the tax base value is less than cost, the related future income tax liability is recognized on acquisition and added to the asset carrying value. Accordingly, under Canadian GAAP, the Company recognized future income tax liabilities of $33 million and $5 million on the Ozernoe and Tenke acquisitions. However, under IAS 12, temporary tax differences on an asset purchase are not recognized.