EX-99.2 3 exhibit99-2.htm MATERIAL CHANGE REPORT Cardero Resource Corp. - Exhibit 99.2 - Filed by newsfilecorp.com

FORM 51-102F3

MATERIAL CHANGE REPORT

Item 1. Name and Address of Issuer
   
  CARDERO RESOURCE CORP. (the “Issuer”)
  Suite 2300, 1177 West Hastings Street
  Vancouver, B.C.
 

V6E 2K3

 

Item 2.

Date of Material Change

 

 

September 20, 2012

 

Item 3.

News Release

 

The date of the press release issued pursuant to section 7.1 of National Instrument 51-102 with respect to the material change disclosed in this report is September 20, 2012. The press release was issued in Vancouver, British Columbia through the facilities of the TSX Venture Exchange via Stockwatch and Market News Publishing.

 

Item 4.

Summary of Material Change

 

 

The Issuer reports final drill results from the Sheini Hills Iron Ore Project, Ghana.

 

Item 5.

Full Description of Material Change

 

The Issuer reports final batch of high-grade drill results from Phase I drilling at the their Sheini Hills Iron Project, in northeastern Ghana. The Phase I drill program was completed in August 2012 and all results have been received in full.

 

Highlights include Hole 063, which returned 51.60 metres from surface grading 48.50% iron, including 16.00 metres grading 50.81% iron. Four of the seven cross-sections reported in this release (1014950N, 101440N, 1013050N and 1012800N) have weighted averages ranging from 41.1% iron to 43.92% iron, reflecting the generally higher-grade results returned from the northern portion of the drill area.

 

The program focussed on a core 9 kilometre-long zone of outcropping haematite- ironstone ridges with peripheral surface ferricretes. A total of 67 diamond drill holes have been completed with results received for all holes (58 diamond drill holes were submitted for assay, while 9 holes were drilled for geological interpretation and metallurgical testing).

 

Regional work, including satellite interpretation, airborne geophysical surveys and verification mapping have identified an additional 24 kilometres of potential ironstone deposits, which will be drill-tested in Phase II.

 

SRK Consulting has been retained to complete a maiden resource estimate report in accordance with NI 43-101. SRK anticipates completion and dissemination of the report in Q4 2012.

 

 

Results are presented in detail, by drill section, below:



- 2 -

Figure 1: DRILL SECTION 1014950N

 

Table 1: DRILL SECTION 1014950N

Hole ID From (m) To (m) Thickness (m) Iron Grade %
SCD064 0.00 48.00 48.00 47.38
and 61.90 73.75 11.85 23.17
Average thickness / hole * 59.85  
Weighted average grade*   42.58

All results now reported for this section. *Weighted average thickness and grade based on full intersections. Reported drill intercepts are based on apparent rather than true thickness as there is insufficient data with respect to the shape of the mineralization to calculate absolute true thickness.

Figure 2: DRILL SECTION 1014400N


- 3 -

Table 2: DRILL SECTION 1014400N

Hole ID From (m) To (m) Thickness (m) Iron Grade %
SCD055 0.00 4.00 4.00 30.34
and 6.00 27.55 21.55 42.00
and 38.70 63.90 25.20 42.34
incl. 50.20 63.90 13.70 47.00
and 81.00 170.70 89.70 46.16
SCD060 59.25 125.10 65.85 42.93
Average thickness / hole * 103.15  
Weighted average grade*   43.92

Drill holes SCD055 previously reported (NR12-24). All results now reported for this section. *Weighted average thickness and grade based on full intersections. Reported drill intercepts are based on apparent rather than true thickness as there is insufficient data with respect to the shape of the mineralization to calculate absolute true thickness.

Figure 3: DRILL SECTION 1013050N

Table 3: DRILL SECTION 1013050N

Hole ID From (m) To (m) Thickness (m) Iron Grade %
SCD061 0.00 23.70 23.70 41.92
and 59.70 128.20 68.50 41.69
SCD062 0.00 25.70 25.70 28.10
SCD063 0.00 51.60 51.60 48.50
incl. 0.00 16.00 16.00 50.81
SCD067 312.80 395.80 83.00 39.83
Average thickness / hole * 63.13  
Weighted average grade*   41.11

All results now reported for this section. *Weighted average thickness and grade based on full intersections. Reported drill intercepts are based on apparent rather than true thickness as there is insufficient data with respect to the shape of the mineralization to calculate absolute true thickness.


- 4 -

Figure 4: DRILL SECTION 1012800N

Table 4: DRILL SECTION 1012800N

Hole ID From (m) To (m) Thickness (m) Iron Grade %
SCD059 0.00 15.00 15.00 23.84
SCD065 14.30 65.00 50.70 45.90
and 84.35 116.50 32.15 45.88
SCD066 36.70 108.70 72.00 45.36
Average thickness / hole * 56.62
Weighted average grade*   43.72

All results now reported for this section. *Weighted average thickness and grade based on full intersections. Reported drill intercepts are based on apparent rather than true thickness as there is insufficient data with respect to the shape of the mineralization to calculate absolute true thickness.

Figure 5: DRILL SECTION 1012000N


- 5 -

Table 5: DRILL SECTION 1012000N

Hole ID From (m) To (m) Thickness (m) Iron Grade %
SCD044       not assayed
SCD046 0.00 5.10 5.10 41.33
and 98.00 123.45 25.45 36.88
SCD047 9.10 41.80 32.70 40.67
SCD051 0.00 3.60 3.60 48.61
and 78.00 134.20 56.20 38.45
incl. 79.00 124.00 45.00 40.11
SCD052 0.00 6.00 6.00 43.03
and 19.00 62.70 43.70 40.11
SCD054 no significant results
Average thickness / hole* 43.19  
Weighted average grade*   39.52

Drill holes SCD046, SCD051, SCD052, SCD054 previously reported (NR12-24). All results now reported for this section. *Weighted average thickness and grade based on full intersections. Reported drill intercepts are based on apparent rather than true thickness as there is insufficient data with respect to the shape of the mineralization to calculate absolute true thickness.

Figure 6: DRILL SECTION 1011200N

Table 6: DRILL SECTION 1011200N

Hole ID From (m) To (m) Thickness (m) Iron Grade %
SCD035 0.00 75.20 75.20 35.08
incl. 0.00 53.20 53.20 38.25
SCD037 0.00 3.60 3.60 56.44
and 31.70 109.20 77.50 35.35
incl. 31.70 53.70 22.00 41.64
incl. 60.00 77.00 17.00 40.73
SCD040 8.20 58.60 50.40 40.23
SCD042 25.55 72.50 46.95 36.25
Average thickness / hole * 63.41  
Weighted average grade*   36.71

Drill holes SCD035, SCD040 previously reported (NR12-20, NR12-24). All results now reported for this section. *Weighted average thickness and grade based on full intersections. Reported drill intercepts are based on apparent rather than true thickness as there is insufficient data with respect to the shape of the mineralization to calculate absolute true thickness.


- 6 -

Figure 7: DRILL SECTION 1010600N

Table 7: DRILL SECTION 1010600N

Hole ID From (m) To (m) Thickness (m) Iron Grade %
SCD048 0.00 106.00 106.00 37.35
incl. 0.00 66.00 66.00 41.63
and 116.00 125.50 9.50 30.33
SCD053 0.00 1.00 1.00 56.24
and 4.20 71.20 67.00 37.17
incl. 4.20 45.00 40.80 41.77
SCD056 62.40 111.20 48.80 29.52
incl. 62.40 74.00 11.60 39.10
Average thickness / hole * 77.43  
Weighted average grade*   35.45

Drill holes SCD048, SCD053 previously reported (NR12-24). All results now reported for this section. *Weighted average thickness and grade based on full intersections. Reported drill intercepts are based on apparent rather than true thickness as there is insufficient data with respect to the shape of the mineralization to calculate absolute true thickness.

QUALIFIED PERSON

EurGeol Keith Henderson, PGeo, the Issuer’s Executive Vice President and a qualified person as defined by National Instrument 43-101, has reviewed the scientific and technical information that forms the basis for portions of this material change report, and has approved the disclosure herein. Mr. Henderson is not independent of the Issuer, as he is an officer and shareholder.

QA/QC

The work program at Sheini is supervised by Christopher White (the Issuer) and Dr. Karel Maly (Aurum Exploration Limited), who together are responsible for all aspects of the work, including the quality control/quality assurance program. On-site personnel at the project rigorously collect and track samples which are then security sealed and shipped to ALS Laboratories, Kumasi, Ghana, for sample preparation, and onward to OMAC Laboratories (an ALS Group Issuer), Ireland, for analysis. OMAC’s quality system complies with the requirements for the International Standards ISO 9001:2000 and ISO 17025: 1999. Analytical accuracy and precision are monitored by the analysis of reagent blanks, reference material and replicate samples. Quality control is further assured by the use of international and in-house standards. Blind certified reference material is inserted at regular intervals into the sample sequence in order to independently assess analytical accuracy.


- 7 -

 

Figure 8:

Maps showing Sheini property (left) and the Phase 1 drill program focus in north-central area (right). The drill program focused on diamond drilling of ironstone ridges as well as reverse circulation drilling of surface iron/ferricrete. Section lines are shown for Figures 1, 2, 3, 4, 5, 6 and 7. * Previously released sections and results.

Cautionary Note Regarding Forward-Looking Statements

This material change report contains forward-looking statements and forward-looking information (collectively, "forward-looking statements") within the meaning of applicable Canadian and US securities legislation. All statements, other than statements of historical fact, included herein including, without limitation, statements regarding the anticipated content, commencement and cost of exploration programs, anticipated exploration program results, the discovery and delineation of mineral deposits/resources/reserves, the timing for and completion of a resource estimate for a portion of the Sheini deposit, the ultimate nature and required expenditures of the work programs under the prospecting licenses; business and financing plans and business trends, are forward-looking statements. Although the Issuer believes that such statements are reasonable, it can give no assurance that such expectations will prove to be correct. Forward-looking statements are typically identified by words such as: believe, expect, anticipate, intend, estimate, postulate and similar expressions, or are those, which, by their nature, refer to future events. The Issuer cautions investors that any forward-looking statements by the Issuer are not guarantees of future results or performance, and that actual results may differ materially from those in forward looking statements as a result of various factors, including, but not limited to, variations in the nature, quality and quantity of any mineral deposits that may be located, variations in the market for, and pricing of, any mineral products the Issuer may produce or plan to produce, the Issuer's inability to obtain any necessary permits, consents or authorizations required for its activities, the Issuer's inability to produce minerals from its properties successfully or profitably, to continue its projected growth, to raise the necessary capital or to be fully able to implement its business strategies, and other risks and uncertainties disclosed in the Issuer's 2012 Annual Information Form filed with certain securities commissions in Canada and the Issuer's annual report on Form 40-F filed with the United States Securities and Exchange Commission (the "SEC"), and other information released by the Issuer and filed with the appropriate regulatory agencies. All of the Issuer's Canadian public disclosure filings may be accessed via www.sedar.com and its United States public disclosure filings may be accessed via www.sec.gov, and readers are urged to review these materials, including the technical reports filed with respect to the Issuer's mineral properties.


- 8 -

Item 6. Reliance on subsection 7.1(2) or (3) of National Instrument 51-102
   
  Not applicable
   
Item 7. Omitted Information
   
  No information has been omitted on the basis that it is confidential.
   
Item 8. Senior Officer
   

The following senior officer of the Issuer is knowledgeable about the material change disclosed in this report.

   
  Michael Hunter, President & CEO
  Business Telephone No.: (604) 331-0096
   
Item 9. Date of Report
   
  September 24, 2012