EX-99.1 2 ex991.htm NI 43-101 TECHNICAL REPORT

Exhibit 99.1

 

 

  

 

 

GREAT PANTHER MINING LIMITED

 

Technical Report on the 2019 Mineral Reserves and Mineral Resources of the Tucano Gold Mine, Amapá State, Brazil

 

Report for NI 43-101

 

 

 

Contributors:

Reno Pressacco, M.Sc. (A), P.Geo.

Jason J. Cox, P.Eng.

Goran Andric, P.Eng.

Fernando A. Cornejo, M.Eng., P.Eng.

Neil Hepworth, M.Sc., CEng MIMMM

Marcelo Antonio Batelochi, MAusIMM

 

 

 

 

March 25, 2020

Effective Date: December 31, 2019

 

55 University Ave. Suite 501 I Toronto, ON, Canada M5J 2H7 I T + 1 (416) 947 0907 www.rpacan.com 

 

 
 

 

 

Report Control Form

 

Document Title   Technical Report on the 2019 Mineral Resources and Mineral Reserves of the Tucano Gold Mine, Amapá State, Brazil
     

Client Name & Address

 

 

 

Great Panther Mining Limited

1330-200 Granville St.

Vancouver, ON

V6C 1S4

     
Document Reference   Project #3186

 

 

Status & Issue No.  

FINAL

Version

 

 

       

Issue Date

Effective Date

 

March 25, 2020

December 31, 2019

 
       
Lead Author   Reno Pressacco  

(Signed)

 

 

         
Peer Reviewer  

Chester Moore

Brenna Scholey

 

 

 

(Signed)

(Signed)

 

         
Project Manager Approval  

Torben Jensen

 

 

 

(Signed)

 

 

         
Project Director Approval  

Luke Evans

 

 

 

(Signed)

 

 

         
Report Distribution   Name No. of Copies
       
    Client  
       
    RPA Filing 1 (project box)
                   

 

 

Roscoe Postle Associates Inc.

now part of SLR Consulting Ltd

55 University Avenue, Suite 501

Toronto, ON M5J 2H7

Canada

Tel: +1 416 947 0907

Fax: +1 416 947 0395

mining@rpacan.com

 

 

 

 www.rpacan.com

Table Of Contents

PAGE

1 Summary 1-1
Executive Summary 1-1
Economic Analysis 1-11
Technical Summary 1-12
2 Introduction 2-1
Sources of Information 2-1
List of Abbreviations 2-3
3 Reliance on Other Experts 3-1
4 Property Description and Location 4-1
Location 4-1
Mineral Tenure 4-1
Surface Rights 4-8
Royalties and Agreements 4-10
Environmental Liabilities 4-11
Permits and Other 4-11
5 Accessibility, Climate, Local Resources, Infrastructure, and Physiography 5-1
Accessibility 5-1
Physiography 5-2
Climate 5-2
Infrastructure 5-3
6 History 6-1
Prior Ownership, Development, and Production History 6-1
Exploration 6-3
Previous Mineral Resource Estimates 6-13
7 Geological Setting and Mineralization 7-1
Regional Geology 7-1
Property Geology 7-4
Local Geology and Mineralization 7-7
Mineralization Weathering Types 7-11
8 Deposit Types 8-1
9 Exploration 9-1
10 Drilling 10-1
Drilling Summary 10-1
Drilling Methods 10-2
Surveys and Survey Coordinate System 10-15
Diamond Drill Core 10-15

 

 

\

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page i
 www.rpacan.com

 

 

Core Recovery 10-16
Drilling Orientation 10-16
Grade Control Drilling 10-16
Sampling 10-17
11 Sample Preparation, Analyses, and Security 11-1
Sample Preparation 11-1
Sample Security 11-1
Sample Analysis 11-1
Sample Quality Assurance/Quality Control 11-2
Quality Assurance/Quality Control Data Analysis 11-2
12 Data Verification 12-1
13 Mineral Processing and Metallurgical Testing 13-1
Summary 13-1
Historical Plant Performance 13-2
Test Work Review 13-10
Conclusions and Design Criteria 13-14
14 Mineral Resource Estimate 14-1
Summary 14-1
Urucum Deposit 14-4
Tap AB Deposit 14-51
Urucum East and Duckhead Deposits 14-85
Tap C Deposit 14-99
Comparison to Previous Estimates 14-100
15 Mineral Reserve Estimate 15-1
Summary 15-1
Open Pit Mineral Reserves 15-2
Underground Mineral Reserves 15-5
Comparison to Previous Estimates 15-8
16 Mining Methods 16-1
Open Pit Mining 16-1
Pit Mining Quantities 16-26
Open Pit Production Schedule 16-27
Underground Mining Methods 16-34
17 Recovery Methods 17-1
Summary 17-1
Crushing and Ore Stockpiling 17-3
Milling, Classification, and Pre-Leach Thickening 17-3
Hybrid CIL Circuit 17-3
Tailings 17-5
Elution 17-6
Carbon Regeneration 17-6
Electrowinning and Gold Recovery 17-6
18 Project Infrastructure 18-1

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page ii
 www.rpacan.com

 

 

Context and Regional Infrastructure 18-1
Site Access and Logistics 18-2
Mining and Support Facilities 18-3
Contractor Facilities 18-4
Process Plant 18-5
Water 18-5
Power 18-7
Fire Protection 18-7
Communications 18-8
Security 18-8
Personnel and Personnel Logistics 18-8
Accommodation and Medical Care 18-9
Tailings Storage Facilities 18-10
19 Market Studies and Contracts 19-1
Markets 19-1
Contracts 19-2
20 Environmental Studies, Permitting, and Social or Community Impact 20-1
Project Permitting 20-1
Groundwater and Surface Water Monitoring 20-2
Fauna and Flora 20-5
Threatened and Special Status Species 20-7
Air Quality 20-7
Geotechnical 20-9
Hydrogeology and Hydrology 20-9
Cultural and Archaeological Resources 20-10
Regional Archaeological Context 20-10
Archaeological Studies 20-11
Social or Community Requirements 20-13
Mine Closure 20-15
21 Capital and Operating Costs 21-1
Capital Costs 21-1
Open Pit Capital Cost 21-1
Underground Capital Cost 21-2
Operating Costs 21-4
22 Economic Analysis 22-1
23 Adjacent Properties 23-1
24 Other Relevant Data and Information 24-1
25 Interpretation and Conclusions 25-1
26 Recommendations 26-1
27 References 27-1
28 Date and Signature Page 28-1

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page iii
 www.rpacan.com

 

 

29 Certificate of Qualified Person 29-1
Reno Pressacco 29-1
Jason J. Cox 29-3
Goran Andric 29-4
Fernando A. Cornejo 29-6
Neil Hepworth 29-7
Marcelo Antonio Batelochi 29-8

 

List Of Tables

PAGE

Table 1-1   Mineral Resource Estimate as of September 30, 2019 1-2
Table 1-2   Mineral Reserve Estimate as of September 30, 2019 1-3
Table 4-1   Great Panther Mineral Tenure 4-4
Table 5-1   Monthly Rainfall From 2010 to 2019 5-2
Table 6-1   Summary of Gold Production 6-2
Table 6-2   Conductivity Test Results of a Sample of Pyrrhotite Rich Core from Urucum 6-9
Table 6-3   Number of Exploration Samples Collected by Sample Type and Company 6-10
Table 6-4   Summary of the Mineral Resources as of June 30, 2017 6-13
Table 6-5   Summary of the Mineral Reserves as of June 30, 2017 6-14
Table 7-1   Description of Mineralized Zones in Each Deposit 7-8
Table 10-1   Summary of Drilling by Year - Tap AB and Urucum Deposits 10-1
Table 11-1   Summary of QA/QC Sampling, 2019 11-4
Table 11-2   Total of Blind Reference Material Sent to SGS Chemex, 2019 11-7
Table 11-3   Total of Blind Reference Material Sent to Great Panther Onsite Laboratory, 2019 11-8
Table 13-1   SGS Geosol Samples 13-12
Table 13-2   SGS Geosol Bottle Roll Results 13-13
Table 13-3   Selected Design Criteria (Ausenco) 13-15
Table 14-1   Mineral Resource Estimate as of September 30, 2019 14-2
Table 14-2   Summary of the Urucum Drill Hole Database as of September 30, 2019 14-6
Table 14-3   Summary of the Mineralized Wireframes - Urucum Deposit 14-11
Table 14-4   Descriptive Statistics of Capped and Uncapped Raw Assays 14-14
Table 14-5   Descriptive Statistics of Capped and Uncapped Composited Assays 14-16
Table 14-6   Descriptive Statistics of the Composited Density Measurements By Rock Type - Urucum Deposit 14-18
Table 14-7   Summary of Correlogram Parameters - Urucum Central Lodes 14-25
Table 14-8   Summary of Block Model Origin and Extents - Urucum Deposit 14-26
Table 14-9   Summary of Block Model Attributes - Urucum Deposit 14-27
Table 14-10   Summary of Search Strategy and Interpolation Parameters - Urucum Deposit 14-28
Table 14-11   Summary of Initial Classification Criteria - Urucum Deposit 14-29
Table 14-12   Comparison of Composite Average Grades with Block Estimates - Urucum Deposit 14-35
Table 14-13   Summary of Mineral Resource Pit Shell Input Parameters - Urucum Deposit 14-41
Table 14-14   Sensitivity Analysis - Urucum Deposit 14-42

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page iv
 www.rpacan.com

 

 

Table 14-15   Summary of the Open Pit Mineral Resources as of September 30, 2019 - Urucum Deposit 14-42
Table 14-16   Summary of the Mineral Resource Database - Urucum North Deposit 14-44
Table 14-17   Summary of the Underground Portion of the Mineral Resource Database - Urucum North Deposit 14-44
Table 14-18   Summary of Search Parameters - Urucum North Deposit 14-47
Table 14-19   Block Model PArameters - Urucum North Deposit 14-47
Table 14-20   Summary of the Underground Mineral Resource Estimate as of September 30, 2019 - Urucum North Deposit 14-49
Table 14-21   Summary of the Underground Mineral Resource Estimate as of September 30, 2019 - Urucum Central Deposit 14-50
Table 14-22   Summary of the Tap AB Drill Hole Database as of September 30, 2019 14-53
Table 14-23   List of Mineralized Wireframes by Area - Tap AB Deposit 14-57
Table 14-24   Descriptive Statistics of Uncapped Raw Assays - Tap AB Deposit 14-59
Table 14-25   Descriptive Statistics of Capped Raw Assays - Tap AB Deposit 14-60
Table 14-26   Descriptive Statistics of Capped Composited Assays - Tap AB Deposit 14-61
Table 14-27   Summary of Dry Bulk Densities by Lithology - Tap AB Deposit 14-63
Table 14-28   Summary of Variogram Parameters - Tap AB Deposit 14-72
Table 14-29   Summary of Block Model Origin and Extent - Tap AB Deposit 14-73
Table 14-30   Summary of Block Model Attributes - Tap AB Deposit 14-73
Table 14-31   Summary of Search Strategies - Tap AB Deposit 14-74
Table 14-32   Summary of Mineral Resource Pit Shell Input Parameters - Tap AB Deposit 14-82
Table 14-33   Sensitivity Analysis - Tap AB Deposit 14-82
Table 14-34   Summary of the Open Pit Mineral Resource Estimate as of September 30, 2019 - Tap AB Deposit 14-83
Table 14-35   Summary of the Underground Mineral Resource Estimate as of September 30, 2019 - Tap AB Deposit 14-84
Table 14-36   Summary of the Resource Database - Duckhead Deposit 14-86
Table 14-37   AMC Gold Cut-off Grades used for NEsted Grade Shells - Duckhead Deposit 14-87
Table 14-38   Summary of Search Parameters - Duckhead Deposit 14-89
Table 14-39   Block Model Parameters - Duckhead Deposit 14-89
Table 14-40   Summary of Mineral Resource Pit Shell Input Parameters - Duckhead Deposit 14-91
Table 14-41   Summary of the Open Pit and Underground Mineral Resource Estimates as of September 30, 2019 - Duckhead Deposit 14-92
Table 14-42   Summary of the Resource Database - Urucum East Deposit 14-93
Table 14-43   Mineralized Domains - Urucum East Deposit 14-94
Table 14-44   Summary of Search Parameters - Urucum East Deposit 14-96
Table 14-45   Block Model PArameters - Urucum East Deposit 14-96
Table 14-46   Summary of Mineral Resource Pit Shell Input Parameters - Urucum East Deposit 14-98
Table 14-47   Summary of the Open Pit and Underground Mineral Resource Estimate as of September 30, 2019 - Urucum East Deposit 14-99
Table 14-48   Comparison of Current and Previous Mineral Resource Estimates 14-100
Table 15-1   Summary of the Mineral Reserve Estimate as of September 30, 2019 15-1
Table 15-2   Dilution and Mineral Extraction Estimates 15-4
Table 15-3   Pit Marginal Cut-Off Grade Estimate 15-5
Table 15-4   Underground Cut-Off Grade Estimate 15-6
Table 15-5   MSO Parameters 15-7
Table 15-6   Comparison of Current and Previous Mineral Reserves Estimates 15-8

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page v
 www.rpacan.com

 

 

Table 16-1   Mine Production History 16-1
Table 16-2   Geotechnical Design Recommendations 16-3
Table 16-3   Pit Overall Slope Angle Estimate 16-9
Table 16-4   Net Block Value Input Parameters 16-10
Table 16-5   Pit Optimization Results 16-11
Table 16-6   Selected Pit Shell Quantities 16-13
Table 16-7   Pit Design Parameters 16-14
Table 16-8   Pit Mining Quantities 16-26
Table 16-9   Pit Stockpile Inventory as of September 30, 2019 16-28
Table 16-10   Open Pit Production Schedule 16-29
Table 16-11   Mining Fleet 16-31
Table 16-12   Operating Hours per Shift 16-32
Table 16-13   Equipment Productivity and Utilization factors 16-32
Table 16-14   Current Manpower 16-33
Table 16-15   Range Of Q’ and RMR Values 16-36
Table 16-16   Stope Design Factors and Hydraulic Radius 16-36
Table 16-17   Underground Life of Mine Plan 16-47
Table 16-18   Underground Workforce 16-48
Table 16-19   Mining Department Employees - Excluding Underground Equipment Operators and Maintenance Personnel 16-49
Table 18-1   Summary of TSF Storage Capacity - Updated on December 11, 2019 18-11
Table 18-2   Geometric Characteristics of the East Extension NW TSF 18-24
Table 20-1   Main Licences and Status 20-1
Table 20-2   Closure Plan Total Cost 20-15
Table 21-1   Project Capital Cost 21-1
Table 21-2   Underground Capital Cost 21-2
Table 21-3   Operating Cost 2016 to 2019 21-5
Table 21-4   LOM Open Pit Operating Cost 21-6
Table 21-5   U&M Unit Mining Cost - Ore 21-8
Table 21-6   U&M Unit Mining Cost - Waste Rock 21-8
Table 21-7   U&M Ore Rehandle Cost 21-9
Table 21-8   LOM Underground Total Operating Costs by Major Area 21-9
Table 21-9   LOM Underground Total Operating Costs by Year 21-9
Table 21-10   LOM Average Underground Total Operating Costs 21-10
Table 21-11   Process Plant Operating Cost 21-10
Table 21-12   General and Administration Cost 21-11
Table 21-13   Head Office Administration Cost 21-12

 

List Of Figures

PAGE

Figure 4-1   Location Map 4-2
Figure 4-2   Mineral Rights Holdings 4-3
Figure 4-3   Surface Rights Holdings 4-9
Figure 5-1   Monthly Rainfall from 2014 to 2019 5-3
Figure 5-2   Site Plan 5-4
Figure 6-1   Merged Airborne Magnetic Total Magnetic Image (AS) 6-5
Figure 6-2   Spectrem Electromagnetic Image 6-7
Figure 6-3   Photo of the Conductivity Test Sample 6-9

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page vi
 www.rpacan.com

 

 

Figure 6-4   Tenement Status Map Showing the Coverage of Soil Sampling 6-11
Figure 6-5   Serra da Canga East Stream Sediment Anomaly 6-12
Figure 7-1   Regional Geology Map 7-3
Figure 7-2   Stratigraphic Column 7-5
Figure 7-3   Property Geology Map 7-6
Figure 7-4   Deposit Location Map 7-9
Figure 7-5   Foliation-Parallel Pyrrhotite Mineralization - Urucum Central Open Pit 7-12
Figure 7-6   Remobilized Pyrrhotite Veins - Urucum Central Open Pit 7-13
Figure 7-7   Pyrrhotite Veining in Drill Core 7-14
Figure 8-1   Reconstruction of the Guiana Craton and West Africa Shield 8-1
Figure 10-1   Drill Hole and Channel Sample Location Plan 10-4
Figure 10-2   Drill Hole and Channel Sample Location Plan - Tap AB Deposit 10-5
Figure 10-3   Example Cross Section 94,840N - Tap AB Deposit 10-6
Figure 10-4   Drill Hole and Channel Sample Location Plan - Urucum Deposit 10-7
Figure 10-5   Example Cross Section 98,620 N - Urucum Deposit 10-8
Figure 10-6   Mobilization of RAB Drill and its Compressor 10-10
Figure 10-7   View of a RAB Drill While Drilling 10-10
Figure 10-8   Sample Collection Procedure for a RAB Drill Hole 10-11
Figure 10-9   Sample Collection and Location of Drill Holes 10-12
Figure 10-10   Drilling Procedures for Auger Holes 10-13
Figure 10-11   Sample Collection Procedure for Auger Holes 10-13
Figure 10-12   Grade Control Drilling - Urucum North Deposit 10-14
Figure 11-1   2019 CRMs Submitted to the SGS Chemex laboratory 11-5
Figure 11-2   2019 CRMs Submitted to the Onsite Laboratory 11-5
Figure 11-3   2019 Blank Sample Results, Resource Definition Assaying (SGS Geosol) 11-6
Figure 11-4   2019 Blank Sample Results, Grade Control Assaying (Tucano Gold Mine Lab) 11-6
Figure 11-5   Sample Control Chart for CRM G911-1 11-9
Figure 11-6   Field Duplicate Charts (SGS Geosol vs ALS Chemex) 11-10
Figure 11-7   Pulp Duplicate Charts (Tucano Gold Mine Laboratory vs SGS Geosol) 11-12
Figure 13-1   % Sulphide Ore Processed (2016 to 2019) 13-3
Figure 13-2   % Sulphide Ore Processed (2016 to 2019) 13-4
Figure 13-3   % Plant Availability (2016 to 2019) 13-5
Figure 13-4   % Gold Recovery (2016 to 2019) 13-6
Figure 13-5   Gold Recovery in CIL Tank 1 13-7
Figure 13-6   Relationship Between g/t Au and % Gold Recovery 13-8
Figure 13-7   Size of Leach Feed (2016 to 2019) 13-9
Figure 13-8   Cyanide Consumption Rates (2016 to 2019) 13-10
Figure 14-1   Plan View of the As-Mined Surface for the Urucum Deposit as of September 30, 2019 14-5
Figure 14-2   Lithology and Mineralization, 149 Bench - Urucum Deposit 14-8
Figure 14-3   Pegmatite Intruding BIF - Tucano Gold Mine 14-9
Figure 14-4   Lithology and Weathering, Section 99,040N - Urucum Deposit 14-10
Figure 14-5   Upper Tail Histogram - Urucum South Deposit 14-12
Figure 14-6   Upper Tail Histogram - Urucum Central Deposit 14-13
Figure 14-7   Upper Tail Histogram - Urucum North Deposit 14-13
Figure 14-8   Histogram of Sample Lengths - Urucum Central Deposit 14-15
Figure 14-9   Distribution of Composited Density Measurements by Rock Type, Oxidized Zone - Urucum Deposit 14-19
Figure 14-10   Distribution of Composited Density Measurements by Rock Type, Fresh Rock - Urucum Deposit 14-19

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page vii
 www.rpacan.com

 

 

Figure 14-11   Longitudinal Projection of the Gold Distribution, Lode 28 - Urucum North Deposit 14-21
Figure 14-12   Longitudinal Projection of the Gold Distribution, Lode 25 - Urucum North Deposit 14-22
Figure 14-13   Longitudinal Projection of the Gold Distribution, Lode 2 - Urucum Central Deposit 14-23
Figure 14-14   Longitudinal Projection of the Gold Distribution, Lode 20 - Urucum Central (South) Deposit 14-24
Figure 14-15   Sample Correlograms - Urucum Central Lodes 14-25
Figure 14-16   Comparison of Contoured vs. Estimated Gold Grades - Lode 28, Urucum North Deposit 14-31
Figure 14-17   Comparison of Contoured vs. Estimated Gold Grades - Lode 25, Urucum North Deposit 14-32
Figure 14-18   Comparison of Contoured vs. Estimated Gold Grades - Lode 20, Urucum Central Deposit 14-33
Figure 14-19   Comparison of Contoured vs. Estimated Gold Grades - Lode 2, Urucum Central Deposit 14-34
Figure 14-20   Swath Plots - Lode 28, Urucum North Deposit 14-37
Figure 14-21   Swath Plots - Lode 25, Urucum North Deposit 14-38
Figure 14-22   Swath Plots - Lode 20, Urucum Central Deposit 14-39
Figure 14-23   Swath Plots - Lode 2, Urucum Central Deposit 14-40
Figure 14-24   Plan View of the As-Mined Surface for the Tap AB Open Pit as of April 19, 2019 14-52
Figure 14-25   Lithology and Mineralization, 100 Bench - Tap AB Deposit 14-55
Figure 14-26   Lithology and Weathering, Section 94,240N - Tap AB Deposit 14-56
Figure 14-27   Upper Tail Histogram - AB 1 and Torres Areas 14-58
Figure 14-28   Upper Tail Histogram - AB 3 Area 14-59
Figure 14-29   Upper Tail Histogram of the Sample Lengths Within the Mineralized Wireframes - Tap AB Deposit 14-61
Figure 14-30   Histogram of the Dry Bulk Densities for the Un-weathered Banded Iron Formation - Tap AB Deposit 14-62
Figure 14-31   Longitudinal Projection of Lode S03 - Tap AB 3 Deposit 14-65
Figure 14-32   Longitudinal Projection of Lode S16 - Tap AB 3 Deposit 14-66
Figure 14-33   Longitudinal Projection of Lode S01 - Tap AB 1 Deposit 14-67
Figure 14-34   Longitudinal Projection of Lode S02 - Tap AB 1 Deposit 14-68
Figure 14-35   Sample Variograms, Wireframe S03 - Tap AB 3 Deposit 14-70
Figure 14-36   Sample Variograms, Wireframe S02 - Tap AB 1 Deposit 14-71
Figure 14-37   Comparison of Contoured vs. Estimated Gold Grades, Lode S03 - Tap AB Deposit 14-76
Figure 14-38   Comparison of Contoured vs. Estimated Gold Grades, Lode S16 - Tap AB Deposit 14-77
Figure 14-39   Comparison of Contoured vs. Estimated Gold Grades, Lode S01 - Tap AB Deposit 14-78
Figure 14-40   Comparison of Contoured vs. Estimated Gold Grades, Lode S02 - Tap AB Deposit 14-79
Figure 14-41   Swath Plot by Northing, Lode S03 - Tap AB Deposit 14-80
Figure 14-42   Swath Plot by Elevation, Lode S03 - Tap AB Deposit 14-81
Figure 16-1   Pit Wall in Urucum Pit 16-5
Figure 16-2   Geotechnical Sectors 16-8
Figure 16-3   Urucum North Ultimate Pit Design with A-A’ Long Section 16-15
Figure 16-4   Urucum Central North Ultimate Pit Design with B-B’ Long Section 16-16
Figure 16-5   Urucum Central South Ultimate Pit Design with C-C’ Long Section 16-17

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page viii
 www.rpacan.com

 

 

Figure 16-6   Urucum South Ultimate Pit Design with D-D’ Long Section 16-18
Figure 16-7   Tap AB 1 Ultimate Pit Design with E-E’ Long Section 16-19
Figure 16-8   Tap AB 3 Ultimate Pit Design with F-F’ Long Section 16-20
Figure 16-9   Duckhead Ultimate Pit Design with G-G’ Long Section 16-21
Figure 16-10   Urucum East Ultimate Pit Design with H-H’ Long Section 16-22
Figure 16-11   Tap AB Waste Rock Dumps 16-24
Figure 16-12   Urucum Waste Rock Dumps 16-25
Figure 16-13   Total Material Mined by Rock Type 16-30
Figure 16-14   Plant Feed by Rock Type 16-30
Figure 16-15   Longitudinal Section - Urucum North Underground Mine 16-35
Figure 16-16   Modified Mathews Short-Term Stability Estimate 16-37
Figure 16-17   3D Schematic of Up-Hole Retreat Mining Method 16-40
Figure 16-18   Long Projection Indicating Up-Hole Retreat Mining Sequence 16-41
Figure 16-19   Long Projection Indication Primary Ventilation System 16-43
Figure 17-1   Tucano Simplified Process Flow Sheet 17-2
Figure 18-1   U&M Workshop Facilities 18-5
Figure 18-2   Tap D Embankments 18-13
Figure 18-3   Typical Wall Cross Section Schematic 18-14
Figure 18-4   WPP1 Embankments 18-15
Figure 18-5   Wall 11 Cross Section Schematic 18-16
Figure 18-6   NMP Embankments 18-18
Figure 18-7   Integrated WPP1 and NMP TSFs 18-20
Figure 18-8   Proposed TSF Expansion 18-22
Figure 18-9   Typical Cross Section of Walls 21 and 22 18-23
Figure 18-10   Typical Cross Section of Wall 23 18-25
Figure 18-11   East Dam - Extension NW 18-26
Figure 18-12   WPP1 and WPP2 TSF Layout 18-28
Figure 20-1   Location Map of Field Visit Monitoring Points 20-4
Figure 20-2   Ceramics Fragments Found in “Sitio 1” of Mutum Area 20-12
Figure 20-3   Location Map of Affected Communities 20-14

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page ix
 www.rpacan.com

1 Summary

Executive Summary

Roscoe Postle Associates Inc. (RPA), now part of SLR Consulting Ltd (SLR), was retained by Great Panther Mining Limited (Great Panther) to prepare a Technical Report on its Tucano Gold Mine (the Mine or Tucano), located in Amapá State, Brazil. Great Panther acquired the Tucano Gold Mine in March 2019 and holds a 100% interest in the Mine. The purpose of this Technical Report is to support the disclosure of the Mineral Resource and Mineral Reserve estimates for the Tucano Gold Mine as of September 30, 2019. This Technical Report conforms to National Instrument 43-101 Standards of Disclosure for Mineral Projects (NI 43-101).

 

Great Panther is a Canadian gold mining, development, and exploration company which owns the Tucano Gold Mine located in Brazil and the Guanajuato Mine Complex and the Topia Mine located in Mexico. Great Panther also owns the Coricancha Project in Peru. The common shares of Great Panther are listed on both the Toronto Stock Exchange and the New York Stock Exchange and trade under the symbol GPR in Canada and GPL in the USA.

 

The Tucano Gold Mine is a well established open pit mining operation comprising four open pits, Urucum, Urucum East, Tap AB, and Duckhead. The mine production to date has been sourced from all deposits except Urucum East. As of December 31, 2019, the Mine has produced a total of approximately 1,300,000 ounces of gold since commencing operation in 2005. As well as the open pits, the Tucano Gold Mine includes an underground mine Project which sits below the Urucum North open pit.

 

This report presents the first Mineral Resource and Mineral Reserve estimates for the Mine under Great Panther’s ownership. The effective date of the Mineral Resource and Mineral Reserve estimates is September 30, 2019.

 

All currency in this report is US dollars (US$) unless otherwise noted.

 

The Mineral Resource estimate for the Tucano Gold Mine, as of September 30, 2019, is presented in Table 1-1. The Mineral Resource estimate conforms to Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Definition Standards for Mineral Resources and Mineral Reserves (CIM (2014) definitions).

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 1-1
 www.rpacan.com

 

 

Table 1-1 Mineral Resource Estimate as of September 30, 2019

Great Panther Mining Limited - Tucano Gold Mine

 

Category Tonnage (000) Grade (g/t Au)

Contained Metal

(000 oz Au)

Measured      
  Open Pit 1,775 1.76 100
  Underground - - -
  Surface Stockpile 3,786 0.61 74
Total Measured 5,562 0.97 174
       
Indicated      
  Open Pit 4,521 2.32 338
  Underground 3,399 4.1 448
  Surface Stockpile - 0 -
Total Indicated 7,920 3.09 786
       
Measured & Indicated    
  Open Pit 6,296 2.16 438
  Underground 3,399 4.1 448
  Surface Stockpile 3,786 0.61 74
Total Measured & Indicated 13,482 2.22 960
       
Inferred      
  Open Pit 18 3.21 2
  Underground 11,646 2.16 810
  Surface Stockpile - 0 -
Total Inferred 11,664 2.16 812

 

Notes:

1.CIM (2014) definitions were followed for Mineral Resources.
2.Mineral Resources are estimated at various cut-off grades depending on mining method and mineralization style.
3.Mineral Resources are estimated using a long-term gold price of US$1,500/oz Au, and a US$/Brazilian real (R$) exchange rate of 3.8.
4.A minimum mining width of 3 m was used for preparation of mineralization wireframes for the Urucum open pit and Taperebá AB (Tap AB) open pit and underground Mineral Resources.
5.Mineral Resources are inclusive of Mineral Reserves.
6.Mineral Resource statements are prepared using constraining surfaces and volumes for open pit and underground Mineral Resources, respectively.
7.Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.
8.Numbers may not add due to rounding.

 

The Mineral Reserve estimate for the Tucano Gold Mine as of September 30, 2019 is presented in Table 1-2.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 1-2
 www.rpacan.com

 



Table 1-2   Mineral Reserve Estimate as of September 30, 2019
Great Panther Mining Limited - Tucano Gold Mine

 

Category

Tonnage

(000 t)

Grade

(g/t Au)

Contained Metal

(000 oz Au)

Proven      
  Open Pit 1,212 1.79 70
  Underground 189 3.78 23
  Surface Stockpiles 2,446 0.71 56
Probable      
  Open Pit 3,297 2.20 233
  Underground 1,976 4.17 265
  Surface Stockpiles - - -
Proven & Probable      
  Open Pit 4,509 2.09 302
  Underground 2,164 4.13 288
  Surface Stockpiles 2,446 0.71 56
Total Proven & Probable 9,119 2.20 646

 

Notes:

1.CIM (2014) definitions were followed for Mineral Reserves.
2.Open pit Mineral Reserves are estimated within designed pits above marginal cut-off grades that vary from 0.51 g/t Au to 0.62 g/t Au for oxide ore and 0.65 g/t Au to 0.72 g/t Au for sulphide ore. The cut-off grades are derived based on a gold price of US$1,250/oz Au and operating costs sourced from the current operations and mining contracts at an US$/R$ exchange rate of 3.8:1.
3.Mineral Reserves incorporate estimates of dilution and mineral losses.
4.Underground Mineral Reserves were estimated using an incremental cut-off grade of 2.4 g/t Au.
5.A minimum mining width of 20 m was used for open pit Mineral Reserves and 3 m was used for underground Mineral Reserves.
6.The Mineral Reserve estimate includes stockpile inventory.
7.Average metallurgical process recovery: 93%.
8.Bulk density is 2.19 t/m3.
9.Numbers may not add due to rounding.

 

RPA is not aware of any environmental, permitting, legal, title, taxation, socio-economic, marketing, political, or other relevant factors that could materially affect the Mineral Resource and Mineral Reserve estimates.

 

Conclusions

Based on the site visit, discussions with Project personnel, and available information, RPA and Great Panther offer the following conclusions:

 

Geology and Mineral Resources

The gold mineralization at the Urucum and Tap AB deposits is observed to be related to elevated abundances of pyrrhotite that occurs in both stratiform and cross-cutting relationships with the host rocks. The primary host rock has been a banded iron formation (BIF), with other host rocks containing lesser quantities of gold.

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 1-3
 www.rpacan.com

 

 

Digital interpretations of the distribution of the gold mineralization for the Urucum and Tap AB deposits were prepared by RPA using Seequent Limited’s Leapfrog software package. The mineralization wireframes were created using a nominal cut-off grade of 0.5 g/t Au across a minimum width of three metres to align with the cut-off grade and minimum width criteria that are currently being employed by the Mine staff for establishing the ore/waste dig packets at the Urucum deposit.
Review of the resulting contoured grade longitudinal sections for the selected lodes at the Urucum deposit suggests that, in general, the higher gold grades occur as small pockets up to a few tens of metres in size. In places, these higher grade pockets are contained within broader, lower grade zones which locally exhibit shallow northerly plunges. Flat-lying plunges, and steep southerly plunges are also suggested on a more local scale.
The down-plunge limits of many of the higher grade mineralized shoots at Urucum do not appear to be defined by drilling in the wireframes examined.
Examination of the grade distribution for wireframe S03 of the Tap AB deposit reveals that this wireframe has been systematically evaluated by diamond drilling at a spacing of approximately 50 m x 50 m to a depth of approximately 200 m below the current mining surface. The density of drill hole and sample information increases at shallow levels where information from grade control drilling programs is available. The drilling has identified several zones of elevated gold grades. In general, these higher grade zones appear to be oriented along a moderate to steep north plunge. The higher grade zones located immediately below the mining surface in the AB 1 portions of the zone occur as pods approximately 25 m to 50 m in size.
The down-plunge limits of many of the higher grade mineralized shoots within the S03 wireframe of the Tap AB deposit do not appear to be defined by drilling in the wireframes examined.
The 2019 Tucano Mineral Resource estimate resulted in a 51% reduction in Measured and Indicated gold ounces, relative to the previous (June 30, 2017) estimate, after accounting for a 62% reduction in ore tonnage and a 27% increase in gold grades.
The 2019 geological interpretation of the mineralized zones is the most significant factor explaining the reduction in resource tonnage. RPA and Great Panther interpreted mineralized zones as discrete lodes, which in turn were used to constrain the block grade estimates. The 2017 resource model used a geostatistical approach with limited manual interpretation.

 

Mining and Mineral Reserves

The 2019 Mineral Reserve estimate resulted in a 43% reduction in gold ounces compared to the previous (June 30, 2017) estimate as the 51% reduction in ore tonnes is partly offset by a 17% improvement in average gold grades.
The decrease is primarily due to the change in the underlying Mineral Resources, as well as an increase in cut-off grades to reflect current operating parameters.

 

Open Pit Mining

The Mine is a mature open pit mining operation in a steady state of mining production. The operations are sufficiently established to provide the basis of much of the technical and economic inputs required for this study.

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 1-4
 www.rpacan.com

 

 

Economic analysis confirms the economic viability of the open pit Mineral Reserves at the base gold price of US$1.250/oz.
Pit optimizations were carried out on Measured and Indicated Mineral Resources using a block net value (block value = block revenue - block total operating cost), including allowances for dilution and mining loss, and preliminary estimates for pit overall slope angles (OSA).
Individual pit shell selection was made based on a gold price of US$1,250/oz Au for Urucum Central South and Urucum Central North, US$1,350/oz Au for Tap AB 1, Tap AB 3 and Duckhead, US$1,450/oz Au for Urucum North and Urucum East, and US$1,500/oz Au for Urucum South. These pit shells were used to guide the ultimate pit design.
In order to determine if material within the open pit should be sent to the mill for processing or to the waste rock dump, a marginal cut-off grade has been calculated. The marginal cut-off grade, which is referred to as the “Open Pit Discard Cut-off” in the CIM Estimation of Mineral Resource and Mineral Reserves Best Practice Guidelines, differs from the breakeven cut-off-grade since mining costs are excluded from the calculation.  The reason for excluding the mining costs is that material already defined to be within the limits of the open pit must be mined regardless if it is classified as ore or waste in order to access the bench below. 
The mine planning block model is based on the resource model regularized to the minimum practical size dig block (i.e., selective mining unit), that can be selectively excavated by mining equipment currently employed on site. Each block in the regularized model contains the quantities of diluted mineralized tonnes and grades including the tonnages of mining dilution and ore loss, where ore loss (%) = 100% - mining recovery (%). Mining dilution comprises internal dilution inherited during the model regularization and external (contact) dilution resulting from geological/geometric contacts with waste rock.
Geotechnical and pit design parameters are based on data, information, and results from previous geotechnical studies and incorporate the pre-split drilling and controlled blasting. There is a risk that the failure to attain the design pit slopes could result in pit wall instability and the loss of ore at the pit bottom.
The west wall of the Urucum Central South pit underwent slope displacement on October 6, 2019. Since then, the pit has been closed to mining while Great Panther works toward a remediation plan with the assistance of the independent consulting firm Knight Piésold & Co. This pit remains in Mineral Reserves, however, the pit design may be subject to revision once the results of the remediation plan are available.
All pits have been designed with 4 m operating bench heights. To maximize ore selectivity and minimize dilution, it is expected that ore will be mined on 4 m benches.
The catch-berms in fresh rock are stacked at 24 m intervals (Urucum) and 20 m intervals (other pits). It is believed that it may be possible in some higher elevation areas to mine fresh waste rock on 8 m or 12 m high benches, which is more cost effective and may facilitate higher pit sinking rates in terms of vertical metres per year. This is considered a future opportunity that has not been incorporated into the base case mine plan.
The ultimate pit designs contain sufficient run-of-mine (ROM) quantities to support a 10,000 tonnes per day (tpd) processing rate through to late 2021. The open pit Mineral Reserves are included in eight pits, with two largest pits, Urucum and Tap AB containing 95% of the total open pit Mineral Reserves. Oxide ore contributes 22% of the total open pit ore mined. The life-of-mine (LOM) average strip ratio is 6:1.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 1-5
 www.rpacan.com

 

 

Mine waste dumps are located adjacent to the pits, to minimize hauling requirements. Waste dumping platforms are laid out to facilitate dump re-sloping at mine closure.
The LOM production schedule has been prepared quarterly based on the mining activities commencing in Q4 2019. The pit production is founded on mining the ultimate pit bench-by-bench without phases or subdivisions. The LOM pit mining rate averages approximately 66,000 tpd and includes both mineralization and waste material.
The plant feed comprises the ROM ore from the pit and from the stockpiles. The pit ROM production is projected to be a direct feed to the crusher, complemented with the ROM from the stockpiles re-handled on as needed basis.
Contractor mining is carried out by U&M Mineração e Construção S.A. (U&M), one of the largest mining contractors in Brazil, using conventional open pit methods, consisting of the following activities:
Drilling performed by conventional production drills.
Blasting using emulsion explosives and a downhole delay initiation system.
Loading and hauling operations performed with hydraulic shovel, front-end loader, and rigid frame and articulated haulage trucks.
The owner’s personnel monitor the mining contractor and provide engineering support including survey and grade control. Operations run 24 hours per day, seven days a week, on an eight-hour shift rotation.
The open pit is scheduled to operate 365 days per year, 24 hours per day. The U&M work schedule utilizes four crews working eight-hour shifts.
Equipment productivity and utilization factors and equipment operating hour estimates are based on seasonal conditions (dry, transitional, or wet season during the calendar year), rock type, and various mining conditions including different bench mining width and ramp width.
The mine manpower at the end of September 2019 is estimated at approximately 1,493 employees. This includes owner’s and contractor’s workforce. The ongoing pit operations will require this level of manpower for most of the next two years.
Open pit operating costs are estimated to average R$13.35/t mined ($3.51/t moved at a R$/US$ exchange rate 3.8:1) and includes owner and contact mining operating costs. The cost is estimated based on material quantities and unit costs supplied from existing operations comprised of actual 2019 operating costs, projected operating costs, and the current mining contracted rates. The pit operating cost estimate was developed based on cost for drilling, blasting, loading, and hauling and includes labour costs and costs for consumables (diesel, explosive, parts, etc.).

 

Underground Mining

Underground Mineral Reserves are based on a 2016 Pre-Feasibility Study (PFS) carried out by AMC Consultants Pty Ltd. (AMC). RPA reviewed the AMC PFS, and made the following adjustments:
Updated the cost estimates to reflect current inputs and a stand-alone underground mining scenario.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 1-6
 www.rpacan.com

 

 

Updated cut-off grades.
Filtered out stopes that no longer met updated cut-off grades.
Rebalanced the production schedule.
Modern trackless mobile equipment is proposed for the development and stoping operations.
The mine will be accessed by a single portal located at the northern end of Urucum North and twin declines (north and south) based on an orebody strike length of >800 m.
Level intervals will be 20 m (based on 15 m production blastholes and the narrow width of some lodes) with crosscuts between the decline and the mineralization, every 20 vertical metres (vm).
Declines have been designed to allow equipment access to each production level. On each level a crosscut will be developed from the decline to the ore lode/lodes. Decline and crosscut development have been designed at 5.0 m wide x 5.0 m high, sufficient to accommodate 30 t to 40 t trucks.
Ore drives have been designed to be 5.0 m high x 4.0 m wide to accommodate production drills and 10 t load-haul-dump (LHD) units. Trucks will not enter the ore drives.
All waste will be tipped directly into stopes or trucked to surface.
Approximately 2.1 million tonnes (Mt) of ore at an average grade of 4.1 g/t Au will be mined and processed over the 6.5 mine life.
All ore production and mine development is proposed to be done by contractors; this includes all waste rock filling.
Ventilation will be provided via a pull-type (exhausting) system with primary fans located on surface at the top of each of two primary exhaust raises.
With the infrastructure airflow and leakage and balancing allowances, the total airflow determination based on the diesel fleet size is 350 m3/s.
Evaluation of the planned production rate and scheduling indicates that the deposit supports 450,000 tonnes per annum (tpa) to 500,000 tpa. Production rates vary from year to year depending on the number of production fronts becoming available in different areas of the mine.
There are opportunities for further optimization of the production rate in future studies, particularly if additional areas are considered for underground mining (e.g., Urucum Central).
Major scheduling assumptions driving these production rates include: decline and crosscut advance of 140 m/month, ore drive advance of 60 m/month, production rate from stoping of 10,000 t/month for both Uphole retreat and Benching stopes, backfilling rate of 12,000 m3 per month, per stope, for Benching stopes. All scheduling assumptions are based on industry benchmarked data.
Scheduling has been based on maintaining a nearly constant number of primary mobile equipment in both the North and South declines.
Workforce size at full production is estimated to be 240 employees, based on three eight-hour shifts.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 1-7
 www.rpacan.com

 

 

The underground mine would use some of the existing infrastructure built for the open pit operations such as the explosives magazines and warehouse.
Mining costs are estimated to be $50.00/t of ore milled and total operating costs, inclusive of processing and G&A, are estimated to be $75.80/t of ore milled.
An economic assessment of the Underground Mineral Reserves confirms that they are economically viable at the base gold price of $1,250/oz.

 

Mineral Processing

A new grinding configuration (semi-autogenous grinding + ball mill) has allowed Tucano to increase the percentage of sulphide ore in the overall plant blend without substantially affecting their target throughput. This was done while maintaining the % passing at 75 µm to 85 µm.
The plant was originally designed to run at 3.4 million tonnes per annum (Mtpa) considering 90% Sulphide in the blend. The plant blend from May to September 2019 was close to 95% sulphide ore and 5% oxide material and the average annual plant throughput was 3.1 Mtpa, however, this annual figure was affected by lower plant availabilities (i.e., 89%) due to other issues experienced in the plant such as mill grade breakages, power issues and also, issues with the old primary crusher.
The increasing percentage of sulphide ore has not adversely affected plant gold recoveries. On the contrary, the new oxygen plant commissioned in April 2019 has contributed to higher metal recoveries, which resulted in an average gold recovery of 93% from May to December 2019.

 

Infrastructure

The Mine is currently operating and has all of the required infrastructure to carry on operations. Additional surface infrastructure will be required to support the underground operation.
The remaining tailings storage facility (TSF) capacity is 1,879 Mm3, which is sufficient for eight months, from December 2019 to June 2020.
The Mine plans to extend the tailings storage capacity by commissioning three new TSFs, East Dam, East-NW Extension, and West Pond Phase 2 (WPP2), which together will provide approximately 32 Mm3 of tailings storage.

 

Environment, Permitting, and Social Aspects

The Tucano Gold Mine is in possession of all licences required for the operation of the mine, mill, processing plant, and TSFs in compliance with Brazilian regulations. There is currently one licence that is in the process of being renewed and is expected by the third quarter of 2020. While in the process of renewal the current licence remains valid.
Continuous monitoring programs are carried out at the Project, which confirm that there are no material concerns pertaining to non-compliance.
The Mine implements stakeholder engagement and social investment programs focused in three main areas: socio-economic development, public health and safety, and education. The social performance practices at the Project are effective and enable the Mine to maintain a good level of social acceptance. No significant issues with the local communities have been identified since production re-started in 2012.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 1-8
 www.rpacan.com

 

 

Recommendations

Based on the site visit and subsequent review of the available documentation, the following recommendations are offered:

 

Geology and Mineral Resources

Evaluate the potential for adjacent lithologies to the BIF and carbonate units for their potential of hosting significant quantities of gold mineralization.
Carry out a program of assay-to-extinction to more fully understand the nature of the gold distribution of the mineralized samples.
Determine the genetic and temporal relationships between the gold mineralization and the pegmatite units.
Prepare a separate series of underground wireframe interpretations for the Urucum deposit using cut-off grade and minimum width criteria that are reflective of the envisioned operational scenario for an underground mining operation.
Review the capping value applied to the short term grade control block model in consideration of all available drill hole and sample information, as well as all information collected from the plant reconciliation studies.
Carry out additional drill testing to define and outline the extents of the higher grade mineralized shoots found at the Urucum deposit.
Continue contouring exercises for the remainder of the mineralized wireframes present at the Urucum deposit as aids in conducting future variogram analyses as well as aids for developing exploration targets. These contouring exercises should examine not only the distribution of the gold grades alone, but also examine the grade times thickness product.
For future updates to the Urucum long term Mineral Resource block models, use common origins with the short term grade control block models.
Prepare future long term block models for the Urucum deposit using more stringent search strategies that are designed to improve the accuracy of the estimated grades at the local level.
Carry out future updates to the Urucum long term Mineral Resource block models using a sub-blocked block model framework so that the volumes and grades of the mineralized wireframed can be easily modelled with a high degree of accuracy.
Ensure that the estimation parameters and workflows are harmonized between the long term Mineral Resource block model and the short term grade control block model for the Urucum deposit.
Prepare a separate series of underground wireframe interpretations for the Tap AB deposit using cut-off grade and minimum width criteria that are reflective of the envisioned operational scenario for an underground mining operation.

 

  

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 1-9
 www.rpacan.com

 

 

Determine the location of the oxidized to fresh rock transition at the Tap AB deposit to a higher degree of accuracy, particularly in the area of the AB 1 deposit.
Carry out additional drill testing to define and outline the extents of the higher grade mineralized shoots found at the Tap AB deposit.
Evaluate the down-dip projections of the BIF and carbonate units for the Tap C sector for their potential of hosting significant quantities of gold mineralization.

 

Mining and Mineral Reserves

Open Pit Mining

Geotechnical monitoring of open pit stability is imperative to follow best practices for both production and safety reasons. Standard open pit slope monitoring using a prism network should be established and developed continuously as open pit mining progresses.
Review pit design for Urucum Central South once the results of the geotechnical remediation plan are available.
Mining dilution should be controlled as it is a critical modifying factor when estimating Mineral Reserves, since there is an added cost associated with the processing of the waste dilution material.
A full reconciliation of actual plant feed and gold production versus mine plan prediction should be carried out on an ongoing basis in order to more accurately determine the mining dilution and ore loss parameters.
Additional resources in the mine proximity may extend the open pit mine life. While such resources have not yet been identified, RPA is aware that brownfield exploration is underway to see if such opportunities may exist for the near term.

 

Underground Mining

Complete further drilling and investigation work aimed at upgrading Inferred Mineral Resources and increasing the geotechnical and hydrogeological understanding of the deposit at depth, in order to consolidate the design basis for the underground project.
Advance the Underground Project to the FS stage. Opportunity exists to stage the Project such that the second ramp is delayed until production from the first ramp proves successful and mining costs are better understood.
Develop and operate the underground mine with contractors; this resolves any issues regarding supply of an experienced underground work force and allows for a reduction in upfront capital expenditure for mobile equipment.
Consider using truck haulage for all material movement in the underground mine.
Carry out further geotechnical analysis to facilitate design and the efficient recovery of pillars. Detailed geotechnical modelling is recommended during the FS stage. This will also assist with understanding of the potential dilution, particularly in the narrower veins.
Complete further metallurgical test work particularly on the primary sulphide material that will be extracted from underground. There is a risk that unexpected changes to metallurgical performance and gold recovery may occur.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 1-10
 www.rpacan.com

 

 

Complete further environmental work during the FS stage to ensure that the underground operations do not present any issues in terms of environmental compliance. Any compliance issues could inadvertently delay the project or add additional unplanned costs to the project.
Opportunities exist to reduce capital costs for the underground project through locally constructed surface change rooms and offices rather than rental and may be an inexpensive alternative. The use of less expensive Scania P420 trucks for underground haulage once the decline roadway (floor) has been prepared and graded is also an opportunity. These options should be evaluated during the FS.

 

Mineral Processing

Tucano will start a program to improve the understanding of the ore hardness distribution in some of the major deposits. With special consideration to ores potentially extracted from a future underground mine.
The plant currently has dated equipment in need of replacement such as the Primary Crusher.
Further investigation and test work is required to optimize the current cyanide consumption rates, which averaged 1.4 kg/t ore from May to September 2019, which is much higher than the average consumption rates reported in past metallurgical test work.
Further testing to optimize oxygen consumption is also required.
Improving process control tools, especially for the grinding and CIL unit operations, may result in performance gains.
Mineralogical characterization should be undertaken to better understand the influence of other contaminants in plant performance and cyanide consumption.

 

Environment

Environmental aspects in the Amazon region is a global theme, and many efforts have been carried out to preserve this world heritage. Therefore, Great Panther should continue following high environmental standards and updating its best practices procedures in accordance with the regulations in force for the area of the Tucano Gold Mine.

 

Economic Analysis

This section is not required as Great Panther is a producing issuer, and the Property is currently in production and there is no material expansion of current production. RPA has verified the economic viability of the Mineral Reserves through cash flow analysis at the base gold price of US$1,250/oz.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 1-11
 www.rpacan.com

 

Technical Summary

Property Description and Location

The Mine is located in Amapá State, Brazil, at latitude 0.85°N and longitude 52.90°W. The Mine is approximately 200 km from Macapá, the state capital, and is accessible by the Brazilian federal highway BR-210, or by chartered aircraft. The access comprises:

Sealed road for approximately 100 km, from the city of Macapá to Porto Grande.
Unsealed road from Porto Grande to Pedra Branca do Amapari, approximately 75 km.
Unsealed road from Pedra Branca do Amapari to the site, approximately 17 km.

 

Land Tenure

The property comprises 49 mineral rights concessions and leases totalling 261,621 ha. The surface rights for five of the mineral rights concessions have also been secured by agreement. These surface rights agreements are sufficient to cover the existing mining operations at the Mine.

 

In addition to the Mining Concession (851.676/1992) and Exploitation Application (850.865/1987), Great Panther holds approximately 251,000 ha of contiguous exploration tenements. This ground area spans a strike length of approximately 100 km of Paleoproterozoic greenstone terrain and is 100% Great Panther owned.

 

History

Anglo American Plc discovered a mineralized shear zone in 1994, undertook extensive exploration between 1995 and 2002, and through AngloGold, completed an FS of the oxide Mineral Resources in October 2002.

 

In May 2003, the Project was acquired by EBX Gold Ltd (EBX). EBX carried out a FS for the oxide mineral resources and a Pre-Feasibility Study (PFS) for mining the sulphide mineralization.

 

In January 2004, the Project was acquired by Wheaton River Minerals Ltd (Wheaton River) (which later merged with Goldcorp Inc (Goldcorp) in 2005). Mine construction began in July 2004, with the first gold poured in late 2005. The Project was later operated by Mineração Pedra Branca do Amapari (MPBA), a company created in 2003 by EBX, as a heap leach operation until January 2, 2009, when it was placed on care and maintenance due to the inability to treat transition material (not fully oxidized) in the deeper portions of the pits.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 1-12
 www.rpacan.com

 

 

Goldcorp sold the Project to Peak Gold Limited (Peak Gold) in April 2007. Peak Gold later merged with New Gold Inc (New Gold).

 

The operation did not reach the predicted gold production due to issues related to the clayey nature of the saprolite mineralization. In response, metallurgical test work was conducted during 2007 to investigate the potential improvements of installing a wash-plant to remove fines and clays to improve heap percolation. Given that the results from the test work were inconclusive, and considering the relative amount of oxide resource available, the plans for an integrated wash-plant and oxide and sulphide milling circuit were put aside in favour of a milling and carbon-in-leach (CIL) circuit to treat predominantly sulphide, and remnant oxide material.

 

Until the closure of the Project in 2009, mining operations extracted 8.8 (Mt) of ore from four areas, Tap AB (pits 1, 2, and 3), Tap C, Tap D, and Urucum. Total gold production from the heap leach operations was approximately 316,000 ounces of gold.

 

In 2010, Beadell Resources Ltd (Beadell, through Beadell Brasil, a wholly owned subsidiary, acquired the Project and commenced construction of a CIL plant to augment the existing process infrastructure. Mining and stockpiling of ore commenced in 2011 and the CIL plant was commissioned in November 2012. Beadell upgraded the plant from 2018 to 2019 including a ball mill, pre-leach thickener, leach tank, and oxygen plant.

 

Great Panther acquired the Project in March 2019 and holds a 100% interest.

 

Geology and Mineralization

The South American Precambrian Shield comprises approximately 50% of the bedrock in Brazil and consists of major Proterozoic deformation zones surrounding cratonic nuclei of Archean age. The three principal cratons are the Guyana Craton in the north, the Amazon (or Guapore) craton immediately south of the Amazon River, and the São Francisco Craton situated between the Amazon Craton and the coast. The cratons are mostly a granite gneiss complex including some highly metamorphosed supracrustal belts, of which greenstone belts represent a small portion. Remoteness and lack of outcrops due to deep weathering prevent detailed stratigraphic and structural mapping across most of the greenstone belts. However, stratigraphic and structural elements typical for greenstone belts worldwide are well recognized in most South American examples.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 1-13
 www.rpacan.com

 

 

The mineralization at Tucano occurs in a series of deposits over a seven-kilometre strike length associated with a north-south trending shear zone occurring coincident with a north-south line of topographic ridges. From south to north, these deposits have been named Tap A, B, C, and Urucum. Tap D is a separate structure in the west. Higher grades are associated with the more intensely hydrothermally altered rocks.

 

Deep weathering is present in most of the deposits with high grade mineralization extending to the surface through a layer of colluvium several metres thick. Gold mineralization can be found in the fresh rock at depth, in the saprolite zone created by in-situ weathering of the underlying rocks, and in colluvial deposits which overlie the saprolite mineralization as a blanket, spreading out over the hill slopes.

 

Sulphide zones follow shear plane foliation, often crosscutting the BIF and other host meta-sediments and as bedding parallel lenses dipping either east or west along the limbs of the folded BIF units. Outside the shears and faulted zones, host rocks are poor in sulphide and gold. The accumulation of auriferous massive and/or disseminated sulphides in zones of fractures and folds, and forming plunging mineralized shoots, often crossing lithological contacts, suggests an epigenetic event.

 

Exploration Status

Exploration work on the property by previous operators includes geological mapping, rock and soil sampling, ground and airborne geophysical surveys, petrophysics, and diamond drilling with detailed core logging. The focus of the exploration programs has been towards identifying and delineating mineralized gold zones for subsequent production activities. Additional exploration activities have been carried out elsewhere on the property to evaluate selected exploration targets for their potential of hosting new gold mineralized zones.

 

Mineral Resources

The Mineral Resources for the Tucano Gold Mine (Table 1-1) include contributions from four deposits as well as material contained within various stockpiles present throughout the Tucano Gold Mine property. The Mineral Resources from these four deposits are composed of mineralized material that is envisioned to be extracted by both open pit and underground mining methods. Gold mineralization is contained within oxidized lithologies as well as their fresh, un-weathered equivalents.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 1-14
 www.rpacan.com

 

 

Updated grade-block models were prepared for the open pit component of the Urucum deposit, as well as the open pit and the underground component of the Tap AB deposit using drill hole, sample information, and topography that was current as of September 30, 2019. The underground component of the Mineral Resource estimate for the Urucum North deposit was prepared from a grade-block model that used the drill hole and sample information that was current as of November 2, 2015. Drilling completed since the 2015 was reviewed and in RPA’s opinion does not materially impact the Mineral Resource estimate.

 

Mineral Reserves

The Mineral Reserve estimate for the Tucano Project conforms to the CIM (2014) definitions as incorporated by reference into NI 43-101. To convert Mineral Resources to Mineral Reserves, RPA applied modifying factors of dilution and mineral extraction to only the Measured and Indicated categories of the Mineral Resource. Inferred Mineral Resources are not included in the Mineral Reserves. The Mine consists of both open pit and underground Mineral Resources for which Mineral Reserves have been independently estimated.

 

The Mineral Reserve statement for the Mine is presented in Table 1-2. The open pit estimate is based on the newly developed 2019 resource block models as described in Section 14. This Mineral Reserve estimate includes open pit mining in Urucum, Tap AB, Urucum East, and Duckhead and underground mining in the Urucum deposit.

 

Mining Method

Open Pit Mining

The Mine is a well established open pit mining operation comprising four open pits, Urucum, Urucum East, Tap AB, and Duckhead.

 

Mine production within the presently developed LOM pits is the responsibility of a mining contractor, U&M, and utilizes conventional earthmoving equipment with drill and blast, load and haul operations. The mined ore is blasted in four metre benches with backhoe excavators loading ore and waste into off-highway dump trucks. Mined ore is either temporarily stockpiled or fed directly to the crusher.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 1-15
 www.rpacan.com

 

 

Underground Mining

The underground mine project is located below the Urucum North open pit. Access would be via a portal located at the north end of the Urucum North pit. The mine layout is based on the following criteria:

Twin declines accessing the north and south parts of the orebody.
Portal situated on the north side of the Urucum North open pit.
North and south exhaust ventilation raises.
20 m sublevel interval.
Stopes accessed by a footwall drive and crosscuts on every sublevel.
Decline development initiates in Year 1.
Mine plan targets Measured, Indicated, and Inferred Mineral Resources down to 500 mRL (750 metres below sea level (mbs)).

 

Geotechnical data from an infill drill program below the Urucum North Pit indicates that the ground conditions at the Urucum North are suitable for open stoping mining methods. Furthermore, stopes measuring 50 m in length and 20 m in height will be feasible. It will be possible to mine multiple benches simultaneously in the same ore block. As the ore loads are steeply dipping and relatively narrow, they are suitable for a longitudinal version of longhole open stoping.

 

Up-hole retreat will be used in the upper levels of the northern part of the mine. This method permits ore production to commence early in the LOM schedule because mining proceeds in a top-down sequence. Moreover, it can achieve high rates of production as backfill is not required in the mining cycle. A disadvantage of the method, however, is that it requires leaving rib pillars for supporting the sidewalls, which results in an 86% ore recovery.

 

Conventional Avoca will be used for mining the remainder of the orebody. It permits high ore recovery as it does not require leaving pillars along strike. A pastefill plant will not be needed as the method uses rockfill for backfilling. The Tucano site has an abundance of stockpiled waste from open pit mining available as a source of rockfill.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 1-16
 www.rpacan.com

 

 

Sill pillars will be left between ore blocks to permit simultaneous production in multiple mining fronts. These pillars will be partially recovered (estimated at 65% recovery) towards the end of the mine life using Up-hole retreat. As additional information about the resource is acquired, it should be possible to reposition some of the sill pillars in low-grade zones.

 

The mine design uses a 20 m sublevel interval. This sublevel interval favours accurate drilling of longholes, which will help minimize dilution. The ore drives will be 5 m high; consequently, the typical height of an Up-hole Retreat stope or Avoca bench will be 15 m. A minimum mining width of 2.0 m has been assumed. With skin dilution of 0.5 m from each of the footwall and hanging wall, the actual minimum stope width will be 3.0 m.

 

The design of the declines allows the mobile equipment to access each of the production levels. Footwall drives and crosscuts on the sublevels provide access to the stopes. The cross-sectional dimensions of the declines and crosscuts will be 5.0 m high x 5.0 m wide, which is adequate for accommodating Volvo AD35 articulated trucks. The ore drives will have a cross-section of 5.0 m high x 4.0 m wide, which is enough for 10-tonne-capacity LHDs as well as the proposed production drill. The trucks will not enter the ore drives.

 

The following assumptions, based on industry benchmarks, were used to determine the production and development rates and schedules:

Decline and crosscut advance of 140 m/month.
Ore drive advance of 60 m/month.
Production rate from stoping of 10,000 t/month for both Up-Hole retreat and Conventional Avoca.
Backfilling rate of 12,000 m3 per month per stope for Conventional Avoca.

 

The schedule is based on operating three development jumbos and two LHDs for both the north and south declines. The annual ore production tonnages vary depending on the number of production fronts that are available in any given year.

 

Mineral Processing

The existing Tucano gold processing plant was designed by Ausenco. After approximately four years of operation, an expansion was planned as part of the original Definitive Feasibility Study (DFS) to install a 3 MW ball mill. This new secondary grinding mill, alongside the 7 MW single stage SAG mill, was installed in order to maintain 3.4 Mtpa throughput capacity treating 90% of the much harder sulphide ore type.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 1-17
 www.rpacan.com

 

 

The plant flowsheet was modified in 2018 to deal with the harder sulphide ore type and the key features of these flowsheet changes are as follows:

An additional 6 MW ball mill to increase original Ausenco design capacity to 3.6 Mtpa and potentially obtain a finer product size of 80% < 75 μm at a higher proportion of sulphide ore to increase cyanide leach gold recovery and kinetics. Completed in September 2018.
A pre-leach thickener to allow both effective operation of the hydrocyclones which in turn provides higher leach feed pulp % solids. The change in philosophy from the originally proposed tailings thickener to a pre-leach thickener is explained further below. Completed in September 2018.
Additional leach residence time by adding one additional pre-leach tank to allow for the higher proposed plant capacity. Completed November 2018
In November 2018, an oxygen plant was added to the CIL as proposed by Ausenco. An additional Liquid Oxygen plant was added in April 2019

 

At a plant throughput of 450 tonnes per hour and a slurry density of 45% solids, a total volume of 17,200 m3 is required to provide a leach residence time of 24 hours. The existing CIL provides 15,400 m3; therefore, one additional leach tank, 15 m x 15 m is required. The new tank will be located ahead of the existing CIL tanks and used for pre-leaching. This allows a major proportion of gold to go into solution before the resultant pregnant solution comes into contact with the carbon, this speeds up adsorption kinetics.

 

As outlined above, the commissioning of the new oxygen plant was completed in April 2019, which resulted in a consistent increase of gold recoveries to an average of 93% from May to September 2019.

 

Project Infrastructure

Infrastructure at the Mine site includes a central administration building and medical facility, offices (mining, geology, survey, mining engineering, supply, environment, and safety), core shed, nursery, light and heavy equipment workshops, warehouse storage facilities, tire shop, refuelling and washing bays, fire-fighting systems, and explosive magazines. The Project also encompasses a CIL gold plant with administration buildings, workshop, a power generation and distribution facility, security office, sample preparation and assay laboratory, storage area, and a reagent preparation facility. Mine contractors have separate facilities.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 1-18
 www.rpacan.com

 

 

The Mine is connected to the national electrical grid by a 69 kilovolt (kV), 20 megavolt-ampere (MVA) power line via Companhia de Eletricidade do Amapá (CEA), the local supply authority. Power is also provided by an independent 11 MW continuous rated Aggreko diesel-powered generation system. Water is provided from recycled process water and water storage dams.

 

The Mine currently employs a total of 1,493 persons, of whom 381 are Great Panther employees and 1,112 are contractors. Approximately 99% are Brazilian nationals with the majority of the workforce from local towns in proximity to the mine. Accommodations for staff members are provided by a camp located two kilometres from the plant which is capable of housing 142 persons.

 

The plant contains the mechanical treatment (crusher, mill, and thickener) and chemical process (CIL, detox, oxygen plant, elution) areas. The other major infrastructure buildings include the reagents storage warehouse, reagents preparation plant, chemical laboratory and process laboratory, tailings dam and power distribution system. The main administration area includes maintenance (electrical and mechanical) workshops, mine administration facilities, technical services offices, stores warehouse, core yard, mess facility, and medical centre.

 

Market Studies

Approximately 70% of the doré is shipped to Asahi, Canada and 30% to Metalor, Switzerland. The current refining contract with Asahi is valid until the end of December 2020. The refining contract with Metalor is managed through Samsung C&T U.K and is valid until the end of December 2021.

 

Brinks is the designated company to transport the doré from Tucano to the refining facilities. The title change for each shipment occurs typically at the Brampton, Ontario refinery with Asahi, and Sao Paulo airport for Samsung (Metalor). Based on actual contract agreements, the breakdown of costs is set out below:

Refinery charge $0.53/oz Au ($0.50/oz doré).
Transport, handling, and insurance $22.00/oz Au.
Total $ 22.50/oz Au.

 

The costs above are subject to some variation depending on the amount of ounces per shipment, however, they are representative of the average cost.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 1-19
 www.rpacan.com

 

 

The refining process and sampling is supervised by an independent service provider, which includes the analysis of samples from the service provider’s certified laboratory, to ensure quality standards and accuracy of information are met and maintained consistently.

 

Penalties are applied in the refining contract for any impurities, but these are rare occurrences and the penalties are not excessive. The main impact comes from the delay in final payments due to higher sample analysis turnaround time, as a result of a higher number of samples required from the special melt shop.

 

Environmental, Permitting, and Social Considerations

All licences required by various government agencies covering the operation of the Tucano Gold Mine, mill, and processing plant have been obtained or applications for renewals have been filed.

 

The complete environmental studies, permitting, and social or community impact was carried out by SRK Consultants, in 2011, for the Operating Licence issued by the State Secretariat of Environment, Amapá (SEMA) to operate a SAG mill/CIL processing plant.

 

The Mine has been active engaging with the local communities to create and to maintain mutually beneficial relationships by understanding and optimizing the positive influence the Mine can have on local development. The Mine’s community relations personnel implemented wide stakeholder engagement and social investment programs that focused on three main areas: socio-economic development, public health and safety, and education.

 

Groundwater and surface water monitoring is performed through field checking of daily monitoring activities and collection of samples for chemical analysis at Great Panther’s facilities. There are also monthly, quarterly, and half-yearly sample collections as required by environmental agencies, which are required to be sent to a certified external laboratory.

 

The Mine, as part of the requirements of its Operation Licence, annually contributes capital to the Social and Environmental Compensation Funds of the local municipalities of Pedra Branca and Serra do Navio. A council formed by representatives of the communities, City Hall, City Council, and the company reviews and analyzes the programs that will be executed under these agreements in their respective communities.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 1-20
 www.rpacan.com

 

Capital and Operating Cost Estimates

This is a producing mining operation. As such, the mine capital cost for the LOM totals $59.8 million. The open pit capital is $9.5 million, and the underground capital is $50.3 million.

 

The open pit capital cost includes tailings dam expansion, new primary crusher, contractor shop improvements, power line, plant improvements, environmental improvements, closure cost, fire safety system, and others.

 

The Urucum North underground mine capital cost includes surface and underground infrastructure. Surface infrastructure includes portal preparation, surface exhaust fans, change rooms, offices, surface workshop, water supply, fuel storage, surveying and engineering equipment, first fills, raiseboring, and contingency. Underground infrastructure includes ladderways, electrical equipment, power supply and distribution, mine dewatering and water supply, compressed air, refuge chambers, fire detection and suppression equipment, leaky feeder communications system, mine rescue equipment, auxiliary ventilation fans and regulators, and underground workshops. In addition, capital lateral development is included which totals $20 million over the LOM.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 1-21
 www.rpacan.com

2 Introduction

Roscoe Postle Associates Inc. (RPA), now part of SLR Consulting Ltd (SLR), was retained by Great Panther Mining Limited (Great Panther) to prepare a Technical Report on its Tucano Gold Mine (the Mine or Tucano), located in Amapá State, Brazil. Great Panther acquired the Mine in March 2019 and holds a 100% interest in Tucano. The purpose of this Technical Report is to support disclosure of the Mineral Resource and Mineral Reserve estimates for the Tucano as of September 30, 2019. This Technical Report conforms to National Instrument 43-101 Standards of Disclosure for Mineral Projects (NI 43-101).

 

Great Panther is a Canadian gold mining, development, and exploration company which owns Tucano, located in Brazil, and the Guanajuato Mine Complex and the Topia Mine located in Mexico. Great Panther also owns the Coricancha Project in Peru. The common shares of Great Panther are listed on both the Toronto Stock Exchange and the New York Stock Exchange and trade under the symbol GPR in Canada and GPL in the USA.

 

The Mine is a well established open pit mining operation comprising four open pits, Urucum, Urucum East, Tap AB, and Duckhead. Mine production to date has been sourced from all deposits except Urucum East. As of December 31, 2019, the Mine has produced a total of approximately 1,300,000 ounces of gold since commencing operation in 2005. As well as the open pits, Tucano includes an underground mine project (the Project) which is located below the Urucum North open pit.

 

The effective date of the Mineral Resource and Mineral Reserve estimates is September 30, 2019.

 

All currency in this report is US dollars (US$) unless otherwise noted.

 

Sources of Information

The Technical Report was prepared by RPA and Great Panther Qualified Persons (QPs). RPA site visits were carried out by Mr. Reno Pressacco, M.Sc.(A), P.Geo, Principal Geologist, from September 15 to 21, 2019. Mr. Goran Andric, P.Eng., Principal Mining Engineer, carried out a site visit from October 20 to 26, 2019.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 2-1
 www.rpacan.com

 

 

Discussions were held with the following Great Panther personnel:

Mr. Neil Hepworth P.Eng. Chief Operating Officer, Great Panther
Mr. Robert Archer P.Geo., Director and Board member, Great Panther
Mr. Fernando Cornejo, M.Eng., P.Eng., Vice President, Projects and Technical Services, Great Panther
Mr. Marcelo Antonio Batelochi, MAusIMM, Director of Geology, Tucano Gold Mine
Mr. Felipe Fernandes, Manager Technical Services, Tucano Gold Mine
Mr. Carlos Pires, Geologist, Tucano Gold Mine

 

Mr. Pressacco is responsible for Sections 3 to 12, and 14. Mr. Jason J. Cox, P.Eng., Technical Director - Canada Mining Advisory, and Mr. Andric share responsibility for Sections 15, 16, 21, and 22, with Mr. Cox taking responsibility for the underground portions and Mr. Andric taking responsibility for the open pit mining portions. Mr. Cornejo is responsible for Sections 13 and 17. Mr. Hepworth is responsible for Sections 18 and 19. Mr. Batelochi is responsible for Sections 20, 23, and 24. All authors share responsibility for Sections 1, 2, 25, 26, and 27 of the Technical Report.

 

The documentation reviewed, and other sources of information, are listed at the end of this report in Section 27 References.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 2-2
 www.rpacan.com

 

List of Abbreviations

Units of measurement used in this report conform to the metric system. All currency in this report is US dollars (US$) unless otherwise noted.

 

m micron kVA kilovolt-amperes
mg microgram kW kilowatt
a annum kWh kilowatt-hour
A ampere L litre
bbl barrels lb pound
Btu British thermal units L/s litres per second
°C degree Celsius m metre
C$ Canadian dollars M mega (million); molar
cal calorie m2 square metre
cfm cubic feet per minute m3 cubic metre
cm centimetre MASL metres above sea level
cm2 square centimetre m3/h cubic metres per hour
d day mi mile
dia diameter min minute
dmt dry metric tonne mm micrometre
dwt dead-weight ton mm millimetre
°F degree Fahrenheit mph miles per hour
ft foot MVA megavolt-amperes
ft2 square foot MW megawatt
ft3 cubic foot MWh megawatt-hour
ft/s foot per second oz Troy ounce (31.1035g)
g gram oz/st, opt ounce per short ton
G giga (billion) ppb part per billion
Gal Imperial gallon ppm part per million
g/L gram per litre psia pound per square inch absolute
Gpm Imperial gallons per minute psig pound per square inch gauge
g/t gram per tonne RL relative elevation
gr/ft3 grain per cubic foot s second
gr/m3 grain per cubic metre st short ton
ha hectare stpa short ton per year
hp horsepower stpd short ton per day
hr hour t metric tonne
Hz hertz tpa metric tonne per year
in. inch tpd metric tonne per day
in2 square inch US$ United States dollar
J joule USg United States gallon
k kilo (thousand) USgpm US gallon per minute
kcal kilocalorie V volt
kg kilogram W watt
km kilometre wmt wet metric tonne
km2 square kilometre wt% weight percent
km/h kilometre per hour yd3 cubic yard
kPa kilopascal yr year

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 2-3
 www.rpacan.com

3 Reliance on Other Experts

This Technical Report has been prepared by RPA for Great Panther. The information, conclusions, opinions, and estimates contained herein are based on:

Information available to RPA at the time of preparation of this Technical Report.
Assumptions, conditions, and qualifications as set forth in this Technical Report.

 

For the purpose of this Technical Report, RPA has relied on ownership information provided by Great Panther and this information is relied on in Section 4 and the Summary of this Technical Report. RPA has not researched property title or mineral rights for Tucano and expresses no opinion as to the ownership status of the property.

 

RPA has relied on Great Panther for guidance on applicable taxes, royalties, and other government levies or interests, applicable to revenue or income from Tucano.

 

Except for the purposes legislated under provincial securities laws, any use of this Technical Report by any third party is at that party’s sole risk.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 3-1
 www.rpacan.com

4 Property Description and Location

Location

Tucano is located in Amapá State, Brazil, at latitude 0.85°N and longitude 52.90°W, approximately 200 km from Macapá, the state capital, and is accessible via the Brazilian federal highway BR-210, or chartered aircraft (Figure 4-1).

 

Mineral Tenure

Tucano is comprised of 49 mineral rights concessions and leases totalling 261,621 ha (Figure 4-2). The surface rights for five of the mineral rights concessions have also been secured by agreement. These surface rights agreements are sufficient to cover the existing mining operations at Tucano (Figure 4-3). A summary of the expiry dates of the various mineral rights tenure, in addition to a listing of the payments required to maintain the mineral rights in good standing is provided in Table 4-1.

 

In addition to the Mining Concession (851.676/1992) and Exploitation Application (850.865/1987), Great Panther holds approximately 251,000 ha of contiguous exploration tenements. This ground area spans a strike length of approximately 100 km of Paleoproterozoic greenstone terrain and is 100% Great Panther owned.

 

These contiguous tenements include four tenements currently held by Zamin Ferrous (Zamin). Within the four Zamin leases, the rights to any iron ore have been retained by Zamin, however, Great Panther has secured an agreement for the rights to any gold mineralized zones. In 2017, Beadell Brasil Ltda (Beadell Brasil), a previous owner of the Tucano property, also reached an agreement with joint venture partner Mineração Vale dos Reis Ltda (MVR) to increase its holdings in two exploration concessions (858.010/2010 and 850.858/1987) from 70% to 100%. These rights have been assigned to Great Panther.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 4-1
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 4-2
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 4-3
 www.rpacan.com

Table 4-1 Great Panther Mineral Tenure

Great Panther Mining Limited - Tucano Gold Mine

 

Process Titleholder
(Great Panther Subsidiary)
Status Area
(ha)
Project Phase Due Jan 20 Due Jan 21 Expiration
Date
Substance District
858.078/2009

Mneração Serra Da

Canga Ltda

In Progress 9,823 Tucano Exploration Licence Extended     17/04/2020 Gold Serra Do Navio E Pedra Branca Do Amapari
858.124/2013

Tucano Resources

Mineração Ltda

In Progress 5,813 Tucano Exploration Licence Extended R$29,823.05   13/08/2020 Gold Pedra Branca Do Amapari E Porto Grande
858.010/2010

Mineração Vale Dos

Reis Ltda

In Progress 290 Tucano Exploration Licence Extended R$1,487.39   29/08/2020 Gold Pedra Branca Do Amapari E Porto Grande
858.076/2009

Mneração Serra Da

Canga Ltda

In Progress 8,807 Tucano Exploration Licence Extended R$45,180.06   16/01/2021 Gold Serra Do Navio
858.022/2014

Tucano Resources

Mineração Ltda

In Progress 9,348 Tucano Exploration Licence R$47,957.60   17/01/2021 Gold Porto Grande
858.018/2018

Tucano Resources

Mineração Ltda

In Progress 2,527 Tucano Exploration Licence R$8,643.23   06/06/2021 Gold Porto Grande
858.019/2018

Tucano Resources

Mineração Ltda

In Progress 3,736 Tucano Exploration Licence R$12,776.13 R$12,776.13 30/07/2021 Gold Pedra Branca Do Amapari E Porto Grande
858.020/2018

Tucano Resources

Mineração Ltda

In Progress 3,452 Tucano Exploration Licence R$11,806.76 R$11,806.76 30/07/2021 Gold Serra Do Navio E Pedra Branca Do Amapari
858.029/2013

Tucano Resources

Mineração Ltda

In Progress 919 Tucano Exploration Licence Extended R$4,714.68 R$4,714.68 05/09/2021 Iron/Gold Pedra Branca Do Amapari E Porto Grande
858.007/2018

Tucano Resources

Mineração Ltda

In Progress 9,992 Tucano Exploration Licence R$34,174.14 R$34,174.14 13/09/2021 Gold Ferreira Gomes E Porto Grande
858.008/2018

Tucano Resources

Mineração Ltda

In Progress 5,148 Tucano Exploration Licence R$17,605.34 R$17,605.34 13/09/2021 Gold Serra Do Navio/Pedra Branca Do Amarapari
858.082/2017

Tucano Resources

Mineração Ltda

In Progress 1,038 Tartarugalzinho Exploration Licence R$3,551.05 R$3,551.05 13/09/2021 Gold Pedra Branca Do Amapari
858.095/2017

Tucano Resources

Mineração Ltda

In Progress 644 Tucano Exploration Licence R$2,201.66 R$2,201.66 13/09/2021 Gold Porto Grande
858.077/2009 Mina Tucano Ltda In Progress 124 Tucano Exploration Licence Extended R$635.71 R$635.71 04/06/2022 Gold Pedra Branca Do Amapari E Porto Grande

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 4-4
 www.rpacan.com

 

 

Process Titleholder
(Great Panther
Subsidiary)
Status Area
(ha)
Project Phase

Due

Jan 20

Due

Jan 21

Expiration
Date
Substance District
858.100/2014

Mina Tucano

Ltda

In

Progress

1,377 Tucano Application For Exploration     N/A Gold Serra Do Navio E Pedra Bca Amapari
858.103/2011

Mina Tucano

Ltda

Pending

Appeal

5,530 Tucano Application For Exploration     N/A Iron Pedra Branca Do Amapari
858.099/2014

Tucano Resources

Mineração Ltda

Pending

Appeal

10,000 Tucano Application For Exploration     N/A Gold Pedra Branca Do Amapari E Porto Grande
858.081/2014

Tucano Resources

Mineração Ltda

Pending

Appeal

4,875 Tucano Application For Exploration     N/A Gold Porto Grande
855.033/1994

Marina Norte

Empreendimentos
 De Mineração S.A.

In

Progress

3,262 Tucano Application For Exploration     N/A Gold Ferreira Gomes
851.766/1994

Mineração Dorica

Ltda

Assignment Submitted/Pending Appeal 8,983 Tucano Application For Exploration     N/A Gold Serra Do Navio
851.770/1994

Mineração Dorica

Ltda

  4,747 Tucano Application For Exploration     N/A Gold Serra Do Navio
851.771/1994

Mineração Dorica

Ltda

Pending

Appeal

8,750 Tucano Application For Exploration     N/A Gold Serra Do Navio E Pedra Bca Amapari
858.062/1995

Mineração Tanagra

Ltda

In

Progress

8,982 Tucano Application For Exploration     N/A Gold Macapá
858.079/2017

Tucano Resources

Mineração Ltda

In

Progress

269 Tartarugalzinho Application For Exploration     N/A Gold Porto Grande
858.099/2017

Tucano Resources

Mineracao Ltda

In

Progress

997 Tucano Application For Exploration     N/A Gold Porto Grande
858.050/1995

Mineração Tanagra

Ltda

Total Assignment Submitted/Ff 9,300 Tucano Application For Exploration     N/A Gold Macapá
858.051/1995

Mineração Tanagra

Ltda

Total Assignment Submitted/Ff 6,371 Tucano Application For Exploration     N/A Gold Macapá
852.730/1993

Mina Tucano

Ltda

Pending

Appeal

5,530 Duckhead Bid     N/A No Pedra Branca Do Amapari
858.010/1999

Mina Tucano

Ltda

Pending

Appeal

8,634 Tucano Bid     N/A No Pedra Branca Do Amapari
850.865/1987

Mina Tucano

Ltda

In

Progress

6,112 Tucano Exploitation Application     N/A Iron/Gold Pedra Branca Do Amapari E Porto Grande
858.000/1998

Mina Tucano

Ltda

Positive Final Report Submitted 7,884 Tucano Final Report Presented     N/A Gold And Aluminium Ferreira Gomes E Porto Grande
858.263/1996

Mina Tucano

Ltda

Positive Final Report Submitted 9,691 Tucano Final Report Presented     N/A Gold Porto Grande

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 4-5
 www.rpacan.com

 

 

Process Titleholder
(Great Panther
Subsidiary)
Status Area
(ha)
Project Phase

Due

Jan 20

Due

Jan 21

Expiration
Date
Substance District
858.052/2002

Mneração Serra Da

Canga Ltda

Pending Appeal 8,065 Tucano Final Report Presented     N/A Gold Serra Do Navio E Ferreira Gomes
852.336/1994 Mina Tucano Ltda Parcial Report Submitted/Pending Appeal 919 Tucano Licence Extension Requested     N/A Gold Pedra Branca Do Amapari E Porto Grande
858.062/2004 Mina Tucano Ltda Parcial Report Submitted/Pending Appeal 5,771 Tucano Licence Extension Requested     N/A Gold Pedra Branca Do Amapari
858.065/2005 Mina Tucano Ltda Parcial Report Submitted/Pending Appeal 9,323 Tucano Licence Extension Requested     N/A Gold Porto Grande
858.264/1996 Mina Tucano Ltda Parcial Report Submitted/Pending Appeal 10,000 Tucano Licence Extension Requested     N/A Gold Pedra Branca Do Amapari E Porto Grande
858.054/2004 Mina Tucano Ltda Parcial Report Submitted 971 Tucano Licence Extension Requested     N/A Gold Pedra Branca Do Amapari
858.015/2012

Tucano Resources

Mineracao Ltda

Parcial Report Submitted 8,280 Tartarugalzinho Licence Extension Requested     N/A Gold Tartarugalzinho
858.032/2012

Tucano Resources

Mineracao Ltda

In Progress 8,476 Tartarugalzinho Licence Extension Requested     N/A Gold Tartarugalzinho
850.858/1987

Mineração Vale

Dos Reis Ltda

Parcial Report Submitted/Pending Appeal 5,644 Tucano Licence Extension Requested     N/A Titanium Serra Do Navio E Pedra Bca Amapari
858.002/2011

Mneração Serra Da

Canga Ltda

Parcial Report Submitted/Pending Appeal 77 Tucano Licence Extension Requested     N/A Iron Porto Grande
851.676/1992 Mina Tucano Ltda In Progress 3,971 Tucano Mining Concession     N/A Gold Pedra Branca Do Amapari
858.079/2014 Mina Tucano Ltda Arrendamento Parcial 150 Duckhead Partial Lease     N/A Gold Pedra Branca Do Amapari
858.091/2013 Mina Tucano Ltda Parcial Report Submitted 4,469 Tucano Licence Extension Requested     N/A Gold Serra Do Navio E Pedra Bca Amapari

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 4-6
 www.rpacan.com

 

 

Process Titleholder
(Great Panther
Subsidiary)
Status Area
(ha)
Project Phase

Due

Jan 20

Due

Jan 21

Expiration
Date
Substance District
858.098/2014

Tucano

Resources

Mineracao Ltda

Parcial Report Submitted 8,006 Tucano Licence Extension Requested     N/A Gold Pedra Branca Do Amapari E Porto Grande
858.080/2014

Mina Tucano

Ltda

Parcial Report Submitted 4,593 Tucano Licence Extension Requested     N/A Gold Serra Do Navio E Pedra Bca Amapari
858.002/2016

Tucano

Resources

Mineracao Ltda

Parcial Report Submitted 9,408 Tartarugalzinho Licence Extension Requested     N/A Gold Tartarugalzinho
858.001/2016

Mneração Serra

Da Canga Ltda

Parcial Report Submitted 543 Tucano Licence Extension Requested     N/A Gold Serra Do Navio E Pedra Bca Amapari

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 4-7
 www.rpacan.com

 

Surface Rights

All surface rights of Amapá State belonged to the Brazilian federal government until 1988. During the Second World War, on September 13, 1943, Federal Decree-Law No. 5.812 was enacted by President Getúlio Vargas due to strategic and regional economic development factors.

 

With the promulgation of the current Brazilian Constitution on October 5, 1988, Amapá was elevated to the category of State, where it granted, by INCRA (National Institute of Colonization and Agrarian Reform), to squatters, the survey occupation titles called “Títulos Precários”.

 

Between 2000 and 2003, during the Feasibility Study (FS) phase of gold and iron ore mining, Mineração Pedra Branca do Amapari (MPBA), the owner of all tenements at that time, entered into an indemnity judicial agreement with thirty-two squatters/surface owners, for use and occupation of the surface for mining purposes. These agreements covered the entire area covered by the Brazilian Mineral Agency (ANM) Processes 851.676 / 1992 (current Tucano property) and 851.730/1993, 858.010/1999, 858.079/2014 and 858.114/2004 (current Zamin mine), as shown on Figure 4-2.

 

Specifically, the request of possession (Imissão de Posse) for the surface rights of Tucano (tenement 851.676/1992), including the mine area, stockpiles and waste dumps, tailing dams, processing plant, offices and facilities, was submitted to ANM on May 4, 2005 and the servitude (Concedida Servidão) was granted on October 2, 2006, exempt from onus and royalties to the third parties.

 

There is only one property with interference with the Urucum East target area. It is the 155 ha "Retiro Antonio Ourives" property (Figure 4-3), which Great Panther has agreements via contracts to carry out the 2020 exploration drilling programme. The negotiations for the definitive acquisition of the property are conditioned to the results of Mineral Resources that will be made in 2020.

 

Regarding the other tenements, which are the subject of regional exploration, Great Panther has a procedure for negotiating lease and right of way contracts with the squatters, with remuneration and reimbursement objectives arising from possible interventions in the field inherent to the mineral research.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 4-8
 www.rpacan.com

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 4-9
 www.rpacan.com

 

Royalties and Agreements

Tucano is subject to both federal and state royalties and other royalty agreements in relation to mineral product sales. In summary these are:

the Compensation for Exploitation of Mineral Resources (CFEM).
the Control, Monitoring, and Supervision of Research Activities, Mining, Exploration and Exploitation of Mineral Resources Fee (TFRM).
the Social and Community Development Funds.
a Commodities Royalty.

 

The CFEM is a federal royalty and is calculated over the amount of gross revenue obtained in the sale of mineral products. In respect to gold sales, Great Panther is liable to pay a royalty of 1.5% on gross revenue from production at Tucano. These royalties have been paid for 2019.

 

The TFRM is a royalty levied by Amapá State. The TFRM is currently calculated based on the grams of gold produced multiplied by the state index rate of Brazilian real (R$) 2.25 which is then multiplied by a factor of 0.4. Great Panther has recently finalized negotiations with Amapá State to reduce the factor applied to 0.1 for 2018 and 2019, and 0.25 for 2020 and beyond. The reduced factors have not yet been enacted into law. These royalties have been paid for 2019.

 

The Social and Community Development funds have resulted from various agreements with Amapá State and the municipalities of Pedra Branca do Amapari and Serra do Navio which are located near Tucano.

 

Under the terms of the agreements, Great Panther will pay a maximum 1% royalty over the gross proceeds from gold sales from Tucano to support the socio-economic and community development of the municipalities of Pedra Branca do Amapari and Serra do Navio. The royalties due from 2019 will be paid in Q3 2020.

 

The Commodities Royalty is payable to the previous holders of 13 tenements acquired by Great Panther. The Commodities Royalty is levied at 0.75% of commodity sales revenue arising from those 13 tenements less taxes, transport and insurance expenses, and royalties payable. These royalties have been paid in 2019.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 4-10
 www.rpacan.com

 

Environmental Liabilities

Tucano is an active mining operation centred in dense tropical rain forest located in Amapá State, Brazil, consisting of open pit operations, crushing, milling, and carbon-in-leach (CIL) processing that has a direct impact on the environment and the ecosystem of the region. The predominant impacts are on biological resources, air quality, noise and vibration, archaeology, hydrogeology, and hydrology (ground and surface water), and community stakeholders.

 

Permits and Other

All permits are in place for Tucano. The environmental and archaeological permits (discussed further in Section 20), have confirmed that all relevant monitoring and reporting to is being undertaken within the relevant legal framework and that Tucano is fully compliant in the areas of:

Characterization of flora and fauna.
Documentation and retrieval of archaeological artifacts.
Fauna monitoring programs.
Vegetation clearing and rehabilitation processes.
Dust, emissions, and noise control.
Control of drainage and erosion.
Monitoring of surface and ground water.
Classification and management of industrial solid and liquid wastes.
Environmental emergency plans
Details of funding for community development programs.
Positive impact on the state economy through employment.
Development of educational programs for the community.
Support in maintaining local community infrastructure and services.

 

RPA is not aware of any environmental liabilities on the property. Great Panther has all required permits to conduct the work on the property. RPA is not aware of any other significant factors and risks that may affect access, title, or the right or ability to perform the work program on the property.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 4-11
 www.rpacan.com

5 Accessibility, Climate, Local Resources, Infrastructure, and Physiography

Accessibility

The mine site is located approximately 200 km from Macapá. This road access comprises:

A sealed road for approximately 100 km, from the port town of Macapá to Porto Grande.
An unsealed road from Porto Grande to Pedra Branca do Amapari, approximately 75 km.
Unsealed road from Pedra Branca do Amapari to the site, approximately 17 km.

 

Travel from Macapá to Tucano takes approximately four hours by car during the dry season and up to six hours during the wet season, depending on the condition of the unsealed roads. The unsealed roads are passable all year around and no blockages are experienced except during road maintenance. The transport of personnel, bulk materials, fuel, and other supplies passes over various bridges on route to Tucano. These are mostly of wood construction and limited to a 45 t total load (carrier plus load). Most of the bridges have been upgraded recently, allowing for a reliable means of transport to the site.

 

Tucano is also serviced by a 1,100 m airstrip located approximately 800 m from the main gate. Charter flights from Macapá to Tucano take approximately 50 minutes.

 

The nearest accessible communities to Tucano are the towns of Pedra Branca do Amapari (10,000 inhabitants) and Serra do Navio (3,000 inhabitants) which are 15 km from Tucano and approximately 175 km and 200 km from Macapá, respectively.

 

Macapá has a population of approximately 500,000 inhabitants and lies along the equator on the north side of the Amazon River. The majority of the workforce are transported by bus from Serra do Navio, Pedra Branca, and other small surrounding communities. Professional staff commute from either Macapá or other cities in Brazil on a fly-in-fly-out (FIFO) basis.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 5-1
 www.rpacan.com

 

Physiography

Tucano is situated in the low hills to the north of the Amapari River valley in an area within tropical forest characterized by dense vegetation and trees above 50 m in height. The original heap leach pad and plant site were cut from the top of existing hills. The ground drops away quickly to the east of the process plant, first into the valley of Taperebá Creek and then into the valley of the William Creek. The Taperebá AB (Tap AB) pit complex is located on the left bank of William Creek while the Urucum pit is located on the right bank of William Creek, both are bounded on the east by some slightly higher hills. The process plant is located at an altitude of approximately 143 metres above sea level (MASL) while the adjacent William Creek valley is approximately 90 MASL. The hills behind Tucano rise to a height of approximately 320 MASL.

 

Climate

Tucano is located in an area considered to have an equatorial climate, typified by year round high humidity and rainfall. The wet season occurs from January to June and is associated with frequent torrential rain events of long duration. Less rainfall is received during the remaining months, however, rainfall events are still frequent. Measurements of site rainfall over the last 10 years (2010 to 2019) show an average annual rainfall of 2,360 mm. Table 5-1 shows the monthly rainfall measurements for the 2010 to 2019 period. Figure 5-1 shows the monthly rainfall measurements for the 2014 to 2019 period. According to the Brazilian Water Agency (ANA), average monthly evaporation rates range from 800 mm (February to April) and 1,900 mm (August to October), with an annual evaporation of 1,424 mm.

 

Table 5-1 Monthly Rainfall From 2010 to 2019

Great Panther Mining Limited - Tucano Gold Mine

 

Year

Jan

(mm)

Feb

(mm)

Mar

(mm)

Apr

(mm)

May

(mm)

Jun

(mm)

Jul

(mm)

Aug

(mm)

Sep

(mm)

Oct

(mm)

Nov

(mm)

Dec

(mm)

Total

(mm)

2010 304 225 262 334 268 160 196 184 57 33 91 186 2,300
2011 249 244 306 320 317 160 238 147 43 95 69 71 2,257
2012 222 281 257 240 182 166 171 109 41 104 52 218 2,043
2013 218 268 196 284 236 103 48 209 104 72 24 151 2,115
2014 196 361 297 303 474 233 145 88 58 133 65 64 2,417
2015 233 318 278 362 367 191 164 45 38 34 29 145 2,204
2016 255 213 447 362 165 267 189 73 64 54 9 208 2,306
2017 331 259 283 276 192 302 88 99 123 130 36 224 2,343
2018 142 353 313 354 320 242 231 31 94 48 124 331 2,583
2019 364 336 234 415 408 201 271 115 74 71 265 276 3,029
Average 251 286 287 325 293 203 194 110 70 77 76 187 2,360

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 5-2
 www.rpacan.com

 

 

Figure 5-1 Monthly Rainfall from 2014 to 2019

 

 

 

Infrastructure

Infrastructure at Tucano includes a central administration building and medical facility, offices (mining, geology, survey, mining engineering, supply, environment, and safety), core shed, nursery, light and heavy equipment workshops, warehouse storage facilities, tire shop, refuelling and washing bays, fire-fighting systems, and explosive magazines (Figure 5-2). Tucano also encompasses a CIL gold plant with administration buildings, workshop, a power generation and distribution facility, security office, sample preparation and assay laboratory, storage area, and a reagent preparation facility. Mine subcontractors have separate facilities.

 

Site communication comprises private branch exchange (PBX) telephone systems and internet links.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 5-3
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 5-4
 www.rpacan.com

 

 

All installations are fenced and monitored by armed guards and cameras. The entrance to Tucano is located at the main site access road. A 122 person accommodation camp is located near the access road to Tucano. This camp is well equipped and includes a gymnasium, games room, laundry, and restaurant area.

 

A doctor works at Tucano Monday to Thursday, while nurses are stationed on the site permanently. An established system is in place for emergency removal of personnel if required.

 

Water

Water for Tucano is provided from water storage dams and recycled process water. Potable water is processed onsite through a potable water treatment plant, where it undergoes filtration and chlorination. The water is transferred from the potable water treatment plant into two potable water tanks.

 

Process water consists of recycled and other waste streams used in the process, including return water from the tailings storage facility (TSF).

 

Power

Tucano is connected to the national electrical grid by a 69 kilovolt-amperes (kVA), 20 megavolt-ampere (MVA) power line via the state-owned Companhia de Eletricidade do Amapá (CEA - the local supply authority). The line capacity is currently 10 megawatt (MW) but is forecasted to increase to 12 MW by mid 2020. An independent 12 MW continuous rated Aggreko diesel-powered generation system is also present at Tucano

 

Workforce

Tucano currently employs a total of 1,493 persons, comprising 381 employees and 1,112 contractors, with all staff Brazilian nationals. Most of the workforce live in towns in close proximity to the mine site. Managers and professional staff either commute from Macapá, the state capital, or from other cities in Brazil on a FIFO basis.

 

Shift workers work a rotating eight hour shift over a 24-hour period with a roster in days of 6 on 1 off, 6 on 2 off, or 6 on 3 off basis. Managers and professional staff either work a roster in days of 19 on, 9 off, or 5 on, 2 off. Expats work on a FIFO basis of six weeks on, three weeks off.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 5-5
 www.rpacan.com

 

 

Commercial Resources and Services

Contracted services and the procurement of goods is managed by the site supply department. Also cleaning services are managed by the administrative department. Transport services are located in Pedra Branca do Amapari (buses) and light vehicles in Goias state. Catering services are sourced from Pedra Branca do Amapari . Larger construction projects, such as the process plant and tails dam expansion, are contracted using companies based in Minas Gerais and Amapá. Great Panther has long term contracts with other companies in Belo Horizonte, which is the hub for many mining industry services in Brazil, and another cities located in Rio de Janeiro, São Paulo, etc. The supply of materials is either directly out of Macapá or shipped in from other cities via the port of Belem to the port of Santana located 10 km from Macapá.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 5-6
 www.rpacan.com

6 History

Prior Ownership, Development, and Production History

Anglo American Plc discovered a mineralized shear zone in 1994, undertook extensive exploration between 1995 and 2002, and through AngloGold, completed an FS of the oxide Mineral Resources in October 2002.

 

In May 2003, Tucano was acquired by EBX Gold Ltd (EBX). EBX carried out a FS for the oxide mineral resources and a Pre-Feasibility Study (PFS) for mining the sulphide mineralization.

 

In January 2004, Tucano was acquired by Wheaton River Minerals Ltd (Wheaton River) (which later merged with Goldcorp Inc (Goldcorp) in 2005). Mine construction began in July 2004, with the first gold poured in late 2005. Tucano was later operated by MPBA, a company created in 2003 by EBX, as a heap leach operation until January 2, 2009, when it was placed on care and maintenance due to the inability to treat transition material (not fully oxidized) in the deeper portions of the pits.

 

Goldcorp sold Tucano to Peak Gold Limited (Peak Gold) in April 2007. Peak Gold later merged with New Gold Inc (New Gold).

 

The operation did not reach the predicted gold production due to issues related to the clayey nature of the saprolite mineralization. In response, metallurgical test work was conducted during 2007 to investigate the potential improvements of installing a wash plant to remove fines and clays to improve heap percolation. Given that the results from the test work were inconclusive, and considering the relative amount of oxide resource available, the plans for an integrated wash plant and oxide and sulphide milling circuit were put aside in favour of a milling and CIL circuit to treat predominantly sulphide, and remnant oxide, material.

 

Until the closure of Tucano in 2009, mining operations extracted 8.8 million tonnes (Mt) of ore from four areas, Tap AB (pits 1, 2, and 3), Tap C, Tap D, and Urucum. Total gold production from the heap leach operations was approximately 316,000 ounces of gold.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 6-1
 www.rpacan.com

 

 

In 2010, Beadell Resources Ltd (Beadell), through Beadell Brasil, a wholly owned subsidiary, acquired Tucano and commenced construction of a CIL plant to augment the existing process infrastructure. Mining and stockpiling of ore commenced in 2011 and the CIL plant was commissioned in November 2012. Beadell upgraded the plant from 2018 to 2019 including a ball mill, pre-leach thickener, leach tank, and oxygen plant.

 

On September 23, 2018, Great Panther announced that it had entered into an Implementation Deed with Beadell to acquire all of the issued ordinary shares of Beadell by means the Scheme under the Australian Corporations Act 2001. On February 11, 2019, the Scheme was approved by the Great Panther’s shareholders (96% in favour) and on February 12, 2019, the Scheme was also approved by 97% of the number of votes cast, and 75% of the number of Beadell shareholders present and voting, at the meeting of Beadell shareholders. On March 5, 2019, the acquisition of Beadell was completed and now Great Panther holds a 100% interest in Tucano via Beadell Resources Australia, which is now a wholly owned subsidiary of Great Panther.

 

A summary of the production history of Tucano from 2005 to 2019 is presented in Table 6-1.

 

Table 6-1 Summary of Gold Production

Great Panther Mining Limited - Tucano Gold Mine

 

Year Company Processing Method

Au

(oz)

2005 Wheaton River / Goldcorp Heap leach 24,715
2006 Goldcorp Heap leach 84,212
2007 Goldcorp -> Peak Gold / New Gold Heap leach 96,426
2008 New Gold Heap leach 86,993
2009 New Gold Heap leach 16,240
2010 New Gold-> Beadell Heap leach 8,118
2011 Beadell SAG/CIL FS -
2012 Beadell SAG/CIL Start up plant 1,108
2013 Beadell SAG/CIL 175,990
2014 Beadell SAG/CIL 156,582
2015 Beadell SAG/CIL 123,027
2016 Beadell SAG/CIL 145,870
2017 Beadell SAG/CIL 129,764
2018 Beadell

Ball Mill/Thicker/SAG/CIL/ O2 Plant

(Oxair - Gas)

123,296
2019 Beadell/Great Panther

Ball Mill/Thicker/SAG/CIL/ O2 Plant

(Praxair - Liquid)

123,867
Total 1,296,208

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 6-2
 www.rpacan.com

 

Exploration

Exploration work at Tucano by previous operators includes geological mapping, rock and soil sampling, ground and airborne geophysical surveys, petrophysics, and diamond drilling (DD) with detailed core logging. The focus of the exploration programs has been towards identifying and delineating mineralized gold zones for subsequent production activities. Additional exploration activities have been carried out elsewhere at Tucano to evaluate selected exploration targets for their potential of hosting new gold mineralized zones. Most of the results of the exploration activities have been compiled into a digital database.

 

Airborne Magnetics, Radiometrics, and DEM

Tucano has been covered by an airborne magnetic, radiometric, and Digital Elevation Model (DEM) survey conducted for previous operator, AngloGold in 1998. The survey was flown by LASA Engenharia e Prospecções S.A covered a total area of 10,377 km2 on 250 m spaced lines at an elevation of 100 m. Two areas; AP1 (Eastern Area) and AP2 (Western Area) were flown. In 2001, Spectrem Air Ltd (Spectrem) conducted an airborne geophysics program for AngloGold involving magnetic, electromagnetic, radiometric, and DEM on 200 m spaced lines.

 

In 2004, CPRM - Serviços Geológico do Brasil (Geological Survey of Brazil) flew a government funded airborne magnetic, radiometric, and DEM survey covering the Araguari River Project area in Amapá State. The survey covered 10,872 km2 at an elevation of 110 m and a line spacing of 500 m. The 2004 program was conducted on the basis that geological characteristics indicated potential for gold, base metals (copper and others), and chromium.

 

During 2015, Beadell contracted Southern Geoscience Consultants (SCS) in Australia to merge and re-process both airborne and ground geophysical datasets. For the airborne magnetic datasets, the AP1 survey was excluded as it was superseded by the higher resolution Spectrem survey. The processing of the airborne magnetic datasets involved re-projection to a common SAD69 22N datum, re-gridding, merging, and filtering. The merged total magnetic intensity (TMI) filters used included:

Reduction to Pole (RTP).
First Vertical Derivative (1VD).
Analytical Signal (AS) of the TMI.
Analytical Signal of the Vertical Integral (ASVI) of the TMI.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 6-3
 www.rpacan.com

 

 

A total magnetic image (AS) from the SCS merged data along with the Tucano outline is shown in Figure 6-1. Banded iron formations (BIFs) and late cross cutting diorite dykes are shown as magnetic highs in red.

 

In 2015, SCS also merged all four datasets for the following radiometric elements; K, U, Th, and TC (total count) using a grid cell of 100 m for the Araguari dataset and a grid cell of 50 m for the others. K and U were not used from the Spectrem dataset due to an issue with the processing of these channels. Prior to merging, the data was scaled and levelled using a histogram approach.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 6-4
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 6-5
 www.rpacan.com

 

 

Airborne Electromagnetic Survey

In January 2001, Spectrem flew an airborne electromagnetic (AEM) survey over the Amapá area for previous operator, AngloGold. A total of 4,601 acceptable line kilometres of data were collected on 200 m spaced lines before the bird (sensor) was lost and thus an estimated 750 line kilometres were never captured. In addition to AEM, aeromagnetic, radiometric, and DEM data were also collected. A large number of good quality bedrock conductors were identified in the largely resistive environment. Most of these conductors seem to be due to carbonaceous units although many of those could also be ascribed to sulphide-rich horizons. A number of conductors, identified as BIFs with associated sulphides, are of interest as gold exploration targets. High conductivity-thickness product AEM anomalies with a magnetic association are probably indicative of pyrrhotite rich sulphide conductors.

 

The Spectrem data did not require levelling or filtering by SCS in 2015 as it was deemed to be of good quality. The data was re-gridded to 40 m to improve image detail (Figure 6-2).

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 6-6
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 6-7
 www.rpacan.com

 

 

Ground Geophysics

In 2004, MPBA contracted Equipe AFC Geofísica Ltda to carry out ground geophysical surveys using the following methods, magnetometer, very low frequency (VLF), and induced polarization (IP) time domain over the Tap AB, Tap D, Urucum, Vila do Meio, and Urucum East projects. The first stage of the geophysical survey included four lines ranging from 300 m to 800 m in length as a baseline against known mineralization at Urucum, Tap D, and Tap AB, which were already defined by drilling.

 

At Vila do Meio and Urucum East, only IP and magnetometer surveys were completed along eight lines for a total length of 6,100 line metres, and 8,350 line metres, respectively. At the first stage, spacing of the magnetometer readings was 10 m and IP dipole-dipole was arranged on a 25 m spacing on short lines up to 400 m in length with a combination of dipole and gradient array on the longer lines up to 800 m in length. At Urucum East and Vila do Meio, magnetometer reading spacing was at 25 m and IP dipole was at 50 m with some lines employing a combination of dipole and gradient array. Mineralization from all lines in Stage 1 orientation surveys was detected with IP. The magnetometer was excellent in defining the BIF. Conductors in areas without drill information were identified and flagged for follow-up work.

 

In 2015, SCS processed the ground magnetic data for Vila do Meio for Beadell with the aim to provide information in the Spectrem data gap area, however, the resolution of the image was considered poor. It was recommended to close the reading spacing to 10 m to improve resolution. A review of the ground IP dataset was not undertaken by SCS.

 

Petrophysics

In 2016, Beadell contracted Western Geoscience Pty Ltd to undertake physical property test work on selected drill cores for Tucano. Results confirmed that pyrrhotite mineralization was of insufficient concentration to be conductive. IP surveys have been proposed to test targets in the Tucano trend for possible sulphide conductors at depth. Table 6-2 shows the test results of a sample of pyrrhotite rich ore from Urucum along with a photo of the core (Figure 6-3).

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 6-8
 www.rpacan.com

 

 

Table 6-2 Conductivity Test Results of a Sample of Pyrrhotite Rich Core from Urucum

Great Panther Mining Limited - Tucano Gold Mine

 

Id No. reading

Grade

(ppm Au)

CondS/m MSus10-3
1 1   1,305.00 2.61
1 2 1,545.00 2.83
1 3 832.00 2.85
1 4 815.00 2.06
1 5 517.00 2.43
1 6 855.00 2.45
Average   48.1 978.17 2.54

  

Figure 6-3 Photo of the Conductivity Test Sample

   

 

Geochemistry

AngloGold conducted extensive soil sampling across Tucano. Results indicated the presence of elevated gold values in the soils over many areas. Some of the elevated gold values required baseline levelling due to several methods of analysis and various detection limits being used during the surveys. Beadell assessed this data along with an interpretation of the geophysics and geological mapping as part of its exploration target generation and ranking review. Figure 6-4 shows the coverage of existing soil sampling and tenement status. It is evident that for many tenements, the first pass soil sampling remains to be completed. Beadell undertook soil sampling in its exploration tenements using 400 m spaced lines and 40 m sample intervals with infill sampling closing to 200 m spaced lines. Soil samples of approximately one kilogram were collected from the B soil horizon using a post hole digger to a depth of 30 cm to 50 cm. Table 6-3 presents a breakdown of sampling work undertaken, by operator.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 6-9
 www.rpacan.com

 

 

Table 6-3 Number of Exploration Samples Collected by Sample Type and Company

Great Panther Mining Limited - Tucano Gold Mine

 

Company Sample type Number of Samples
Anglo Gold Soil 78,134
Anglo Gold Stream sediment 1,349
Anglo Gold Rock chip 3,674
Beadell Soil 3,907
Beadell Stream sediment 263
Beadell Rock chip 1,073

 

Beadell carried out an extensive program of stream sediment sampling in 2017 using a method of fine fraction (200 mesh) bulk leach extractable gold analysis. Samples were collected at approximately 700 m spaced centres, typically one sample per tributary stream. The sampling involved the collection of one composite of 35 sample points along a 100 m stretch of the stream collection point. This method proved effective in identifying a large anomaly in the Serra da Canga East area and is now the subject of a follow-up exploration program. . Figure 6-5 shows the extent of the Serra da Canga stream sediment anomaly.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 6-10
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 6-11
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 6-12
 www.rpacan.com

 

 

Geological Mapping

The tenement package has been extensively mapped by MPBA and work continued under the direction of Beadell’s regional exploration team. Outcrops are generally scarce, however, the composition of the soil and colluvium cover indicated underlying geology, which in conjunction with geophysics, aided in geological interpretation. Mapping typically occurred in conjunction with soil sampling along defined sampling lines.

 

Previous Mineral Resource Estimates

A detailed description of the Mineral Resource and Mineral Reserve estimates for Tucano, as of June 30, 2017, is presented in Wolfe et. al. (2018). A summary of the Mineral Resource estimates for Tucano, as of June 30, 2017, is presented in Table 6-4. A summary of the Mineral Reserve estimates for Tucano, as of June 30, 2017, is presented in Table 6-5.

 

These Mineral Resource and Mineral Reserve estimates are superseded by the current estimates presented in Sections 14 and 15 of this Technical Report.

 

Table 6-4 Summary of the Mineral Resources as of June 30, 2017

Great Panther Mining Limited - Tucano Gold Mine

 

Classification

Tonnes

(000 t)

Grade

(g/t Au)

Contained Metal

(000 oz Au)

Measured 18,448 1.41 835
Indicated 22,293 1.96 1,405
Sub-total, M & I 40,742 1.71 2,240
       
Inferred 16,351 2.19 1,150

 

Notes:

1.The June 2017 Tap AB underground Resource includes 173 kt at 4.68 g/t Au of Inferred Oxide within the Inferred Primary Category.
2.CIM Definition Standards (2014) were used for reporting the Mineral Resources.
3.Mr. B. Wolfe, MAIG is the Qualified Person under NI 43-101 and takes responsibility for the Mineral Resource estimate for the Tap AB Open Pit and Urucum Open Pit Resource. Mr. M. Batelochi, MAusIMM (CP) is the Qualified Person under NI 43-101 and takes responsibility for all remaining resources.
4.Tap AB and Urucum open pit Mineral Resources are constrained by an optimized pit shell at a gold price of US$1,500/oz Au and using Measured, Indicated, and Inferred categories. The cut-off grade (COG) applied to the open pit resources is 0.5 g/t Au. The COG applied to ore stockpiles is 0.5 g/t with the exception of Marginal ore which has a COG of 0.3 g/t Au.
5.The underground COG is 1.2 g/t Au.
6.Drilling results are up to the 30 June 2017 for the Tap AB Open Pit resource. For all other deposits, drilling results up to the 31 December 2016, excluding the Urucum North Underground resource which has drilling results up to September 2015.
7.Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.
8.Mineral Resources are inclusive of their derived Mineral Reserves.
9.Numbers may not compute exactly due to rounding.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 6-13
 www.rpacan.com

 

 

Table 6-5 Summary of the Mineral Reserves as of June 30, 2017

Great Panther Mining Limited - Tucano Gold Mine

 

Area Proved Reserve Probable Reserve Total Mineral Reserve

Tonnes

(000 t)

Grade

(g/t Au)

Contained

Metal

(000 oz Au)

Tonnes

(000 t)

Grade

(g/t Au)

Contained

Metal

(000 oz Au)

Tonnes

(000 t)

Grade

(g/t Au)

Contained

Metal

(000 oz Au)

Oxide Open Pit 3,120 1.92 193 2,545 1.66 136 5,666 1.80 329
Primary Open Pit 5,949 1.74 333 6,836 1.77 390 12,785 1.76 723

Oxide and Primary

Open Pit

9,069 1.80 525 9,381 1.74 526 18,450 1.77 1,051
Stockpiles 3,642 0.66 77 - - - 3,642 0.66 777

Open Pit and

Stockpiles

12,711 1.47 603 9,381 1.74 526 22,092 1.59 1,128
Underground Primary - - - 2,378 3.64 278 2,378 3.64 278
Total 12,711 1.47 603 11,759 2.12 804 24,470 1.79 1,406

 

Notes:

1.Mineral Reserves are reported within open pit designs based on pit optimized shells using the following optimization COGs; Tap AB Oxide: 0.66 g/t Au, Tap AB Primary: 0.82 g/t, Urucum Oxide 0.74 g/t Au, Urucum Primary 0.94 g/t Au, Tap C Oxide 0.66 g/t Au, Tap C Primary 0.86 g/t Au, Urucum East Oxide 0.74 g/t Au, and Urucum East Primary 0.94 g/t Au. The COG is based on total costs per unit (inclusive of processing, general and administration (G&A), technical services and haulage, exclusive of mining costs) and averages $12.8/t for oxide and $16.8/t for primary. Metallurgical recoveries are 95% for oxide and 93% for sulphides. The gold price used for the open pit optimizations was US$1,150/oz Au for Tap AB and US$1,100/oz Au for Tap C and Urucum. The gold price used to calculate the COGs for the reserves reported within the optimized pit designs was US$1,200/oz Au. An exchange rate of US$/R$ of 1:3.2 for Tap AB and 1:3.4 for Urucum was used. Open Pit Mining Recoveries of 100% for oxide and primary were used at Urucum, 90% for oxide and primary at Tap C, and Tap AB and 90% oxide, 100% primary at Urucum East. Dilution used for all pits was 15% for oxide and 20% for primary.
2.2018 Underground Mineral Reserves are stated as of 30 June 2017 and based on a COG of 1.6 g/t Au. The COG is based on an incremental mining and processing cost of $50/t, metallurgical recovery of 90%, a gold price of US$1,120/oz Au and an exchange rate of US$/R$ of 1:3.8.
3.A 0.5 m dilution skin was assumed for the HW and FW side of the underground production stopes making the total dilution 1.0 m in width. Ore losses were assumed to be 8% for the Benching method, 14% for the Uphole retreat method, and ore losses for the recovery of the sill pillars were assumed to be 35%.
4.Numbers may not compute exactly due to rounding.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 6-14
 www.rpacan.com

7 Geological Setting and Mineralization

Regional Geology

The South American Precambrian Shield comprises some 50% of the bedrock in Brazil and consists of major Proterozoic deformation zones surrounding cratonic nuclei of Archean age. The three principal cratons are the Guyana Craton in the north, the Amazon (or Guapore) craton immediately south of the Amazon River, and the São Francisco Craton situated between the Amazon Craton and the coast. The cratons are mostly a granite gneiss complex including some highly metamorphosed supracrustal belts, of which greenstone belts represent a small portion. Remoteness and lack of outcrops due to deep weathering prevent detailed stratigraphic and structural mapping across most of the greenstone belts. However, stratigraphic and structural elements typical for greenstone belts worldwide are well recognized in most South American examples.

 

The consistent north-easterly trend of inferred extensions within granite-greenstone belts across north-eastern South America suggest they have formed during a single major event. The Tucano mineral deposits are located within the Guyana Craton, described by several authors as the Maroni - Itacaiunas mobile belt. This belt runs from Pará and Amapá States of northern Brazil through the Guyanas and into Venezuela.

 

The Maroni-Itacaunas Province at in Central-South Amapá State region is characterized by an association of greenstone bel (the Vila Nova Greenstone sequence) that is composed of clastic metasedimentary rocks interspersed with metabasalts and meta-andesites, containing subordinate layers of iron and manganese formations, calc-silicate schists, and marbles. These units were affected by an orogenic metamorphism under low to medium degree conditions, between the upper green schist and middle amphibolites facies, under intermediate pressure.

 

Structural surveys suggest that the complexes were affected by the same processes of deformation and metamorphism, which resulted in a regional foliation S1-2 oriented according to the N70-85ºW direction. This foliation is affected by a later deformation phase, which generated F3 folds of regional scale and with open to closed forms and with axis according to the direction NW-SE.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 7-1
 www.rpacan.com

 

 

Figure 7-1 below shows the Regional Geology of Tucano Gold Mine.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 7-2
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 7-3
 www.rpacan.com

 

Property Geology

The western part of the Tucano property (about 25% of the area) is underlain by basement gneiss. The balance of the property area is underlain by ortho-amphibolite and meta-sedimentary rocks of the Vila Nova Group (1.75 to 1.9 billion years old), composed essentially of gneisses, granites, amphibolites, banded iron formations (BIF), massive iron formations, schists, and quartzites. These units are intruded by granitic pegmatites, diabase dykes, and gabbro bodies. The metasediments are similar to what has been named the Serra do Navio Formation in the nearby area that was mined by Indústria e Comércio de Minerios S/A for manganese. The metasediments hosting the gold mineralization within the Tucano property lie along the west limb of a north striking syncline (Figure 7-2).

 

On the north end of the syncline, the strike is north-south, with dips approximately 65 degrees to the west. To the south, the dip becomes vertical to dipping slightly northeast, with the strike trending north-northwest. The gold mineralization is associated with iron and carbonate-rich units of the chemical sedimentary sequence known as the William Formation. Gold mineralization is predominantly associated with the BIF facies, but carbonate and calc silicate rocks also host economic mineralization. Sub-economic mineralization may be hosted by any of the lithological units shown in the stratigraphic column (Figure 7-2) except for the late intrusions.

 

Laterite and lateritic colluvium are common throughout the area and tend to be thicker over topographic highs, with thick laterites developed in proximity to BIF. Colluvium is characterized by deeply weathered rock that no longer displays any trace of original structure and commonly has angular fragments that indicate limited transport. The colluvium hosts secondary mineralization. A north-south trending shear zone appears to control gold mineralization by carrying gold-bearing hydrothermal fluids or remobilizing existing mineralization; this can be justified by the presence of mineralization found in BIF that was not deformed by shearing. Mineralization is both conformable and not conformable with meta-sedimentary contacts in the William Formation (Figure 7-3).

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 7-4
 www.rpacan.com

 

 

Figure 7-2 Stratigraphic Column

 

Alluvium / laterites
  Intrusives Basic Db Gabbro / diabase Dykes of diabase and gabbro
Acid Gran. / Peg Pegmatites
Vila Nova Group Clasto-pelitic Sedimentary Unit Quartz Domain QMX Muscovite quartzites Muscovite-quartz schist, muscovite quartzite, locally with fuchsite and / or sillimanite
Pelitic Domain QBX Quartz-mica schists Quartz-biotite-muscovite schist with garnets, interspaced with lenses of calc-silicates, iron formation and muscovite
Clasto-chemical Sedimentary Unit Transitional Unit RANF Quartz-grünerite cummingtonite schist w/ garnets, chlorite and biotite Quartz-amphibole schists and amphibole schists with lenses of silicate facies iron formation and calc-silicates
Chemical Sedimentary Unit (William Fm.) Ferruginous Domain FFER Iron formation, silicate facies Garnet-hornblende-grünerite-diopside; magnetite-grünerite-hornblende schists
BIF-O Iron formation oxide facies (Grünerite)-quartz-magnetite / hematite, sometimes with garnets and diopside
BIF-OS Iron formation oxide-silicate facies (Hornblende)-diopside-grünerite-quartz with magnetite; (diopside)-hornblende-garnet, quartz-magnetite-grünerite schist
Calc-magnesian Domain CALC Schists with diopside porphyroblasts Actinolite-tremolite-diopsides, hornblende-diopsides, amphibole-diopsides, with epidote, biotite and garnets
RCB Marble and carbonate schists Calcic marble, serpentine marble with tremolite, forsterite, fayalite, hastingsite, chlorite and magnetite; actinolite-tremolite-carbonate schists
Volcanic Unit   MTB or ANF Metabasics ortho-amphibolites Plagioclase amphibolite’s, biotite-amphibole schists, plagioclase-cummingtonite-hornblende schists

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 7-5
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 7-6
 www.rpacan.com

 

Local Geology and Mineralization

The mineralization at Tucano occurs in a series of deposits over a seven kilometre strike length associated with a north-south trending shear zone occurring coincident with a north-south line of topographic ridges. From south to north, these deposits have been named Tap A, B, C, and Urucum. Tap D is a separate structure in the west. The locations of the deposits are shown in Figure 7-4. Higher grades are associated with the more intensely hydrothermally altered rocks.

 

Continuous, high grade, steeply to shallowly plunging ore lodes are developed along mineralized shear zone hosts. The geometry and plunge of the ore shoots are interpreted to be controlled by gently plunging F2 fold hinges and more steeply dipping fault intersections.

 

The texture and mineralogy along the shear zone indicate a high-temperature hydrothermal system. The interaction of favourable rock type, structure, heat, and mineralized solutions has resulted in the deposition of gold bearing, non-refractory sulphides concentrated near or on major lithological contacts. This mineralized zone exhibits intense hydrothermal alteration, particularly silicification and sulfidation, bearing auriferous pyrrhotite, and pyrite. Alteration is most intense in the proximity of reactive meta-sediments such as BIF, followed by amphibolite, carbonate, schist, and to a lesser extent, calc-silicate rocks. Table 7-1 shows a description of length, width, depth, and continuity for each deposit.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 7-7
 www.rpacan.com

 

 

Table 7-1 Description of Mineralized Zones in Each Deposit

Great Panther Mining Limited - Tucano Gold Mine

 

Deposit Pit / Area Total Horizontal Length of Mineralization (m) Average Width (m) Depth Defined by Drilling (m) Continuity of Mineralization Down Plunge (m)
Tap AB Tap AB 1 580 9.0 300 450
Tap AB 2 600 5.5 350 440
Tap AB 3 420 5.5 460 480
Tap C Tap C1 800 6.0 150 150
Tap 3C 450 7.0 300 150
Tap C3N 350 5.5 90 150
Gap 170 11.0 130 100
Urucum Urucum North 1,000 4.0 780 550
Urucum South 1,300 10.0 360 750
Urucum East Urucum East 230 7.0 75 180
Duckhead Main Lode 80 12.0 210 220
HW Lode 90 15.0 165 180

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 7-8
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 7-9
 www.rpacan.com

 

Tap AB and Urucum

The Tap AB and Urucum deposits are emplaced within a north-south trending, multiply deformed volcano-sedimentary sequence of rocks that is bounded to the west by the Amapari Granite. The deformation history has resulted in steeply dipping N-S shear zones and the gold mineralization is associated with alteration and sulphide mineralization of various lithologies within the deformed sequence. Mineralization occurs over at least seven kilometres of strike length and has been interpreted to extend to more than 700 m below the surface. A suite of late post-gold pegmatites has been emplaced throughout the sequence in various orientations and is largely barren of gold.

 

Mineralization also occurs in colluvium overlying the sequence and is spatially related to the bedrock mineralization and is interpreted to be derived thereof. Typically for many deposits of its type, the mineralization often presents as being somewhat discontinuous and irregularly distributed on the scale of approximately 50 m to 100 m.

 

Gold mineralization at Urucum is predominantly strata bound to specific sheared lithological units within the BIF and is characterized by strong disseminated and shear fabric pyrrhotite sulphide. The strong association between gold and pyrrhotite results in a highly visual ore in fresh rock that is easily discernible from non-mineralized BIF and other rock.

 

Urucum East

The Urucum East deposit is located east of the Urucum Mine in the northern fold hinge of the Tucano Gold Mine stratigraphy. The deposit consists of a single, east-west striking and flat (-30°) north dipping sulphide lode which has an average thickness of seven metres and a strike length of 230 m. Mineralization at Urucum East is hosted in a wedge of carbonate and altered BIF located inside a swarm of parallel, east-west striking and -30° north dipping pegmatite dykes/sills which have intruded the host schist unit. The deposit is covered by a blanket of poorly mineralized colluvium up to 10 m thick and weathered to a depth of approximately 50 m below the surface.

 

Duckhead

The Duckhead deposit is located south east of the Tap AB deposit. Mineralization at Duckhead is controlled by the recently interpreted intersection of steep east-west striking shear zones with a BIF lithological contact to form steeply west plunging high grade shoots. The texture and mineralogy along the shear zone indicate high-temperature hydrothermal alteration, particularly silicification and sulfidation, bearing auriferous pyrite.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 7-10
 www.rpacan.com

 

Mineralization Weathering Types

Deep weathering is present in most of the deposits with high grade mineralization extending to the surface through a layer of colluvium several metres thick. Gold mineralization can be found in the fresh rock at depth, in the saprolite zone created by in-situ weathering of the underlying rocks, and in colluvial deposits which overlie the saprolite mineralization as a blanket, spreading out over the hill slopes. The saprolite and the colluvial mineralization are collectively grouped together as “oxide mineralization”.

 

Sulphide zones follow shear plane foliation, often crosscutting the BIF and other host meta-sediments and as bedding parallel lenses dipping either east or west along the limbs of the folded BIF units. Outside the shears and faulted zones, host rocks are poor in sulphide and gold. The accumulation of auriferous massive and/or disseminated sulphides in zones of fractures and folds, and forming plunging mineralized shoots, often crossing lithological contacts, suggests an epigenetic event.

 

Primary or Sulphide Mineralization

Sulphide mineralization within fresh rock is only found in drill core and does not outcrop at Tucano. Pyrrhotite and pyrite are the most abundant sulphides. Chalcopyrite, arsenopyrite, sphalerite, and galena occur in trace amounts (less than 1%). At Urucum, the mineralization occurs with intense silicification and pyrrhotite is the dominant sulphide (Figures 7-5, 7-6, and 7-7). At Tap AB the gold is associated with masses containing 5% to 10% pyrite, and pyrrhotite only occurs in trace amounts.

 

The individual sulphide masses are several metres thick and can be elongated on strike along north-northwest or north-south orientations. The sulphides extend in depth along a plunge dipping from 10º to 40º at about N10ºW. The dip ranges from almost vertical at Urucum, to 30°W at the south of the Tap AB deposit. Studies show that the gold occurs as free gold and not tied into the crystal lattice of the sulphide minerals. Mineralization is not confined to any particular lithology, nor is it concordant with lithological contacts.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 7-11
 www.rpacan.com

 

 

Figure 7-5 Foliation-Parallel Pyrrhotite Mineralization - Urucum Central Open Pit

 

Source: Cooley (2019)

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 7-12
 www.rpacan.com

 

 

Figure 7-6 Remobilized Pyrrhotite Veins - Urucum Central Open Pit

Source: Cooley (2019)

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 7-13
 www.rpacan.com

 

 

Figure 7-7 Pyrrhotite Veining in Drill Core

Source: RPA

 

Saprolite Mineralization

Intense tropical weathering reaching down 30 m to 300 m has caused the formation of saprolite, that is, an in-situ oxidation of the sulphide mineralization and host rocks. The saprolite consists mainly of iron oxides and hydroxides, clay, and silica. Gold mineralized zones within saprolite follow the strike, dip, and plunge of the sulphide mineralization. Semi-decomposed remnants of the sulphide mineralization become more frequent with depth.

 

Weathering has left much of the saprolite material amenable to free digging, however, some of the saprolite has required blasting prior to excavation. The mineralization in these more competent zones may range from entirely oxidized to partially or even fresh sulphides.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 7-14
 www.rpacan.com

 

 

Colluvial Mineralization

The colluvial deposits occur along north-south trending ridges cut by William Creek. The creek is at about 115 m elevation and the ridges reach 300 m. The top and slopes of the ridges are covered by alluvial and colluvial sediments. It is difficult to separate alluvial and colluvial sediments in the field and therefore they are collectively named colluvium.

 

All mineralized gold zones in fresh rock are covered by mineralized colluvium, which varies in character according to the subsurface lithology. The grade of mineralization in colluvium tends to reflect the grade of underlying ore shoots, with patches of low grade or barren colluvium usually reflecting low grade or barren underlying saprolite zones. However, zones of mineralization in colluvium tend to be wider than in underlying saprolite due to mechanical transport and development of some secondary mineralization due to variations in surface soil chemistry.

 

Deep weathering and intense fixation of iron in the upper portions of the soil often create a laterite horizon. The top of the colluvium is usually a layer rarely more than one metre thick composed of silty, clayey, and sandy materials, poor in fragments of limonite. Immediately below there is a variable layer up to 10 m thick containing lateritic fragments rich in iron oxide dispersed in a ferruginous clay-sand matrix which becomes rich in manganese at the base.

 

The colluvium deposits are heterogeneous, reflecting the varied subsurface lithologies. Occasionally there are semi-decomposed, angular fragments of these lithologies within the colluvium.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 7-15
 www.rpacan.com

8 Deposit Types

The Tucano gold deposits are hosted in shear zones within a number of different Paleoproterozoic, metasedimentary host rocks. This mineralization style is considered to represent an orogenic, structurally controlled gold mineralizing system. The strong association of gold mineralization within, and proximal to, a major BIF unit makes the setting of the Tucano deposit unique in the district, however, iron formation hosted gold deposits are well documented throughout Precambrian cratons worldwide. The age and structural controls at Tucano exhibit similarities to Birimian Orogenic Gold District deposits in West Africa. Figure 8-1 shows a reconstruction of the Guiana Craton with the West Africa Shield showing the location of the major gold deposits in the area. Deep and highly variable thickness of weathering is a feature shared by Tucano with other gold deposits in the Guiana Craton.

 

Figure 8-1 Reconstruction of the Guiana Craton and West Africa Shield

 

Source: Great Panther

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 8-1
 www.rpacan.com

9 Exploration

Great Panther acquired the Tucano in March 2019. All prior exploration conducted by other companies and government agencies prior to Great Panther’s involvement is summarized in Section 6.

 

Since acquiring the property, Great Panther has not completed any material exploration work on the Tucano property, other than drilling.

 

Summaries of the exploration results obtained by Great Panther during 2019 can be found in news releases issued by Great Panther in 2019 and 2020 (Great Panther 2019 and Great Panther 2020).

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 9-1
 www.rpacan.com

10 Drilling

Drilling Summary

Auger, rotary air blast (RAB), reverse circulation (RC), and DD methods have been employed at Tucano. A summary of the drilling history for the Tap AB and Urucum deposits is presented in Table 10-1. Drill hole locations, and example cross sections are presented in Figures 10-1 to Figure 10-5, inclusive.

 

Table 10-1 Summary of Drilling by Year - Tap AB and Urucum Deposits

Great Panther Mining Limited - Tucano Gold Mine

 

Year Diamond Drilling Reverse Circulation Drilling
No. Holes Total Length No. Holes Total Length
Tap AB Deposit
Pre-1995 16 876 2,369 65,373
1995 0 0 20 1,839
1996 43 4,792 103 7,981
1997 43 11,989 78 6,366
1998 57 7,692 38 3,246
1999 17 1,331 1 90
2000 55 3,595 139 1,548
2001-2003 0 0 0 0
2004 41 4,081 58 4,942
2005 78 9,831 0 0
2006 9 802 1 38
2007 85 6,958 3 94
2008 83 13,611 0 0
2009 2 562 0 0
2010 119 13,848 69 3,762
2011 67 13,373 657 15,307
2012 5 2,819 1,123 20,949
2013 0 0 23 1,948
2014 5 927 920 24,497
2015 0 0 351 14,590
2016 5 1,577 1,346 87,140
2017 19 5,557 850 50,361
2018 2 975 332 24,113
2019 12 2,408 0 0
Tap AB Total 763 107,604 8,481 334,184
Urucum Deposit
Pre-1995 5 582 1,539 60,981

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 10-1
 www.rpacan.com

 

 

Year Diamond Drilling Reverse Circulation Drilling
No. Holes Total Length No. Holes Total Length
1995 0 0 63 5,787
1996 39 6,175 10 606
1997 24 7,341 11 672
1998 29 13,125 5 222
1999 0 0 0 0
2000 1 61 1 18
2001-2003 0 0 0 0
2004 12 1,997 10 688
2005 13 1,868 0 0
2006 61 11,668 4 304
2007 55 8,688 0 0
2008 82 14,674 0 0
2009 1 308 0 0
2010 13 2,279 33 2,298
2011 15 6,269 199 6,779
2012 8 4,243 2 56
2013 0 0 0 0
2014 3 1,416 948 21,695
2015 25 9,772 675 25,176
2016 9 3,773 308 18,694
2017 0 0 4 328
2018 0 0 377 21,326
2019 10 1,955 388 18,232
Urucum Total 405 96,194 4,577 183,862

 

Drilling Methods

The QP is of the opinion that the auger and RAB drilling methods are efficient regional exploration techniques for identifying the surface expression of Tucano’s style of mineralization, which is characterized by narrow lodes ranging from 3 m to 10 m thickness located in a region of dense forest without outcrops. The auger technique was a crucial component of the discovery of the Urucum Mine. Drill holes in both techniques are up to 20 m in length and above the water table. If the water table is intercepted, the drill hole is terminated.

 

In 2019, Great Panther began using auger and RAB drilling to cover strategic tenements outside of the Tucano area as part of the Regional Exploration program. While the results of this exploration program have not been finalized, they are not expected to have a material impact on the Mineral Resource or Mineral Reserve estimates.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 10-2
 www.rpacan.com

 

 

Where possible, RAB drilling is given priority due to its greater productivity (50 m/day to 80 m/day) relative to auger drilling (15 m/day to 20 m/day). In certain instances, however, there are areas where access is difficult or a high health and safety risk is posed if RAB drilling is used, in these instances auger drilling is conducted.

 

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 10-3
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 10-4
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 10-5
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 10-6
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 10-7
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 10-8
 www.rpacan.com

 

 

Rotary Air Blast (RAB)

Tucano’s RAB drill rig is a model PWH-5000, that is a pneumatic reciprocating piston-driven "hammer" to energetically drive a heavy drill bit into the rock. The drill bit is hollow, solid steel and has approximately 38 mm thick tungsten rods protruding from the steel matrix as buttons. The tungsten buttons are the cutting face of the bit. The cut materials are blown up outside of the rods and collected at surface. The use of an air compressor, Ingersoll Rand Model XAS 420 (269 hp), which pushes 25.48 m³/min / 900 PCM / 100 psi down the hole, lifts the material to surface.

 

The drill operation was carried out by a team of three workers, one responsible for rig operation and two assistants responsible for collecting the one metre samples and assist with the operation.

 

The drill holes were completed on exploration lines spaced 100 m apart, with a drill hole every 40 m, and detailed on potential targets to lines spaced 20 m apart with a drill hole every 10 m. This is deemed to be the optimum drill spacing to intercept mineralized bodies with 3 m to 10 m of thickness.

 

The RAB operational procedure begins with the positioning of the rig at the selected point (Figure 10-6), without any pad, orienting the rig vertically (Figure 10-7). Once drilling is commenced, samples are collected manually at one metre intervals (Figure 10-8), packed in plastic bags, identified, and sent to the laboratory. The hole is identified by a low relief stamp in tin foil plate nailed to a wooden stake (Figure 10-9). Every metre, the ground and the collectors are cleaned. RAB historically produces lower quality samples than RC because the cuttings are blown up the outside of the rods and can be contaminated from contact with other rocks.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 10-9
 www.rpacan.com

 

 

Figure 10-6 Mobilization of RAB Drill and its Compressor

 

 

 

Figure 10-7 View of a RAB Drill While Drilling

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 10-10
 www.rpacan.com

 

 

Figure 10-8 Sample Collection Procedure for a RAB Drill Hole

 

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 10-11
 www.rpacan.com

 

 

Figure 10-9 Sample Collection and Location of Drill Holes

 

 

 

Auger Drilling

Auger drilling is conducted with a helical screw that is driven into the ground with rotation and the earth is lifted up the borehole by the blade of the screw.

 

At Tucano, auger drilling is carried out by a team of five employees, working in rotation, with three employees operating the drilling and two in support work. Drill holes follow the exploration lines through the forest.

 

The procedure includes removal of all obstacles within a two metre radius, drilling (Figure 10-10) and collecting samples at every 30 cm advance (Figure 10-11) until they compose a one metre sample. As with RAB drilling, this one metre sample is packed in plastic bags, identified, and sent to the laboratory. The hole is identified by a low relief stamp in tin foil plate nailed to a wooden stake.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 10-12
 www.rpacan.com

 

 

Figure 10-10 Drilling Procedures for Auger Holes

 

 

 

Figure 10-11 Sample Collection Procedure for Auger Holes

 

 

 

Reverse Circulation

Up until 2017, the RC drilling carried out by Beadell used a track mounted Schramm T60 with a track mounted auxiliary booster operated by McKay Sondagens (a Brazilian company established by Australian owned McKay Drilling). The rig had a mounted cyclone and cone splitter which were both accessible for cleaning during drilling operations. The rig previously drilled to depths of 400 m and was the main tool used for in-pit grade control as well as resource extension and definition work.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 10-13
 www.rpacan.com

 

 

In 2019, Great Panther contracted RC drilling from Geosedna Perfurações Especiais SA, who used two types of drill rigs: an RC Explorac 50 and a Prominas A15 (made in Brazil). Both drill rigs have a mounted cyclone and cone splitter which are accessible for cleaning during drilling operations. The drill rigs have completed holes up to 150 m in length, primarily for short term grade control purposes and for near mine exploration of oxide ore bodies (Figure 10-12).

 

Figure 10-12 Grade Control Drilling - Urucum North Deposit

 

 

Diamond Drilling

DD utilizes two skid mounted rigs: the Brazilian Maquesonda Mach 1200 and the Longyear LF-70 diamond rigs operated by Brazilian drilling contractor Geosol. The rigs have previously drilled up to 550 m on site and are mainly employed to test deeper underground resource targets.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 10-14
 www.rpacan.com

 

Surveys and Survey Coordinate System

Drill hole collar locations of grade control RAB holes and exploration core holes are surveyed using a Total Station Leica 407 in the SAD69 22N coordinate system. The collar azimuth and initial dip of the diamond drill rods are measured using the same survey equipment. Downhole surveys for the RC drilling are undertaken using a Reflex Gyro tool. Downhole survey deviation measurements are collected in diamond holes by Great Panther utilizing a Reflex Ez- North Seeking Gyro, however, prior to 2017, Beadell used a Reflex Maxibore II unit. These surveys are generally undertaken every 100 m as the hole progresses to monitor drilling deviation. Maxibore survey data is collected at three metre intervals after the drill holes are completed. Geology staff check and validate the survey data before entering the information into the main drill hole database.

 

Diamond Drill Core

DD utilizes both HQ2 and NQ2 diameter core. Normally holes are started utilizing HQ2 size in oxide material and are reduced to NQ2 size once fresh rock is encountered. Drill core is orientated with a Reflex ACT III orientation tool in fresh rock. Core orientations and depths are verified by site geologists and core yard personnel for accuracy before the core is photographed, and geologically and geotechnically logged.

 

Geological logging is completed manually and then re-typed into the Acquire database, which digitizes the lithology, structure, mineralization, alteration, weathering, and material resistance/hardness. Core is routinely measured for bulk density, with the bulk density of the oxide measured immediately after drilling to determine the wet bulk density prior to drying, and the subsequent dry bulk density. The method of density measurement used was the Jolly Method (also known as the Archimedes method). The procedure uses the weight of an intact 15 cm length of whole core that is measured in air and again in water. The density is calculated by the formula specific gravity (SG) = weight in air / (weight in air - weight in water). As oxide and transitional rock normally contains moisture, the sample is wrapped in plastic film and weighed while the core is still wet / moist, soon after being received from the drill rig. This enables a wet density to be calculated. The core is then oven dried, and the procedure repeated to attain the dry density. Once the bulk density core has been tested and photographs taken, it is cut in half for assay. The remaining core is stored in purpose built, undercover racks at the site core yard.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 10-15
 www.rpacan.com

 

Core Recovery

Core recovery is measured along with rock quality designation (RQD) in core run intervals. Average recoveries of core from all Tucano deposits is 94%. Both core recovery and RQD are recorded together in the drill hole database.

 

Drilling Orientation

Due to the general north-south strike of the Tucano system, exploration, delineation, and grade control drill holes are typically orientated to either azimuth 90° or 270°, depending on the dip of the lodes and/or availability of accessible drilling sites. Dips of - 50° to -90° can be achieved by the T60 Schramm RC rig whereas dips of -55° to -90° are possible with the diamond rigs. Most holes are orientated with dips of around -60°.

 

Grade Control Drilling

In-reserve pit drilling has been carried out on an initial spacing of 20 m to 40 m within the plane of the mineralized structure. Deeper underground intercepts have been completed on a long section spacing of 40 m to 80 m.

 

At Urucum, grade control drilling is carried out on a nominal 10 mN x 12 mE spacing with infill to 10 mN x 6 mE in zones of lode mineralization. Grade control samples are systematically collected using RC drill rigs and the information is used to prepare the final dig layouts for ore/waste control. Additional grade control samples are collected on a periodic by means of channel sampling, slope channel sampling, and sampling of blast hole cuttings.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 10-16
 www.rpacan.com

 

Sampling

Grade control samples of between 1.5 kg to 6.0 kg in weight are collected at one metre intervals from an adjustable cone splitter attached to the base of the cyclone. These cuttings are used for both lithology logging and assaying.

 

Diamond core is predominantly sampled at one metre intervals, with some sample lengths being adjusted to accommodate local-scale geological or mineralization features. The sample lengths range from a minimum of 0.6 m to a maximum of 1.4 m. Diamond core is used for structural, geotechnical, and density measurements as well as lithology logging and assaying. Density measurements are completed for both oxide and fresh whole core with the oxide densities calculated before and after drying to determine wet bulk density, dry bulk density, and moisture content. The method of density measurement used was the Jolly Method.

 

The bulk densities of the core samples were also determined by earlier operators using the volume method. While the bulk density information obtained using this method is stored in the drill hole database, this method is no longer used to determine the bulk densities of oxidized and primary materials.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 10-17
 www.rpacan.com

11 Sample Preparation, Analyses, and Security

Sample Preparation

Sample preparation is completed at the Tucano sample preparation facility.

 

Core samples are dried at 105°C, crushed to -8 mm then to -2 mm and split to 0.9 kg to 1.0 kg before being pulverized to 1 mm. The 1 mm pulverized sample is quarter cut to 200 g to 400 g before being pulverized to 95% passing 105 microns (μm). The final pulp is quartered again to achieve a sample of 100 g to 200 g.

 

RC samples are dried at 140°C, crushed to -2 mm (if aggregated) and riffle split to 1.0 kg. The 1.0 kg sample is then pulverized to 1 mm and quarter cut to between 200 g and 400 g. This sample is then pulverized to 95% passing 105 μm and quarter cut to a 100 g to 200 g.

 

Sample Security

Samples analysed by the Great Panther onsite laboratory are securely sealed and stored onsite. Samples to be analysed by external laboratories are securely sealed and stored onsite until delivery to Macapá via the company contracted driver, who then delivers the samples directly to a airlines cargo dispatch facility for delivery to SGS Geosol Laboratorios Ltda (SGS Geosol) in Belo Horizonte, Brazil. Sample submission forms are sent with the samples, and upon receiving the samples the laboratory emails a confirmation notice indicating that the samples have been received, in addition to a job number for tracking purpose.

 

Sample Analysis

Sample analysis is completed by both the Great Panther onsite laboratory for samples from the grade control program and an external laboratory, SGS Geosol, for samples from the resource definition program. SGS Geosol has been accredited by ABS Quality Evaluations Inc and complies with the requirements for ISO 9001:2015, ISO 14001:2015 and ISO/IEC 17025:2005.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 11-1
 www.rpacan.com

 

 

Sample analysis is undertaken at both laboratories using a 30 g charge, with the gold concentration being determined by means of a fire assay with an atomic absorption spectroscopy (AAS) finish. The lower detection limit for the Great Panther site laboratory is 0.01 g/t Au and the lower detection limit for both the SGS Geosol and the ALS Chemex Laboratories (ALS Chemex) is 0.005 g/t Au.

 

Samples from the resource definition program that exhibit elevated sulphide concentrations or other geological features of interest, are sent to the SGS Geosol external laboratory and the Great Panther onsite laboratory so as to obtain the assay results more quickly. When received, the results from the external laboratory then supersede the results of the site laboratory in the drill hole database and are used as an additional means to monitor site laboratory performance.

 

Sample Quality Assurance/Quality Control

Samples are sent to SGS Geosol in Belo Horizonte for analysis. Certified standards are inserted every 20th sample to assess the accuracy and methodology of the laboratory. Field duplicates are inserted every 20th sample of diamond core only to assess the repeatability and variability of the gold mineralization. The field duplicate sample used is the remaining half of the core from the same sample interval. No field duplicates are produced for the RC drilling, which represents the majority for drilling completed. A blank standard is inserted at the start of every batch of approximately 150 samples. In addition, SGS Geosol, also carries out their own internal standards and laboratory duplicates for each lot. Results of the quality assurance/quality control (QA/QC) sampling are assessed on a batch by batch basis and the QP is of the opinion that they are acceptable.

 

Quality Assurance/Quality Control Data Analysis

Data analysis for the Beadell QA/QC results was undertaken by Maxwell Geoservices (Maxwell) of Fremantle, WA on available QA/QC data for gold assays from Beadell’s various drilling programs. The results of that analysis are presented in Wolfe, et. al. (2018). A summary of the 2019 QA/QC results to September 30, 2019 (the drill hole cut-off date for preparation of the Mineral Resource estimates) is summarized below.

 

In early 2016 the grade control data, which was stored in the Minesight Torque database, was integrated to the Maxwell Geoservices Datashed (Datashed) database management system. The Minesight Torque grade control database did not store the quality control or standards data for grade control and only some of the early batches were fully loaded to Datashed. The Datashed database is therefore incomplete for quality control for the period prior to the beginning of 2016.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 11-2
 www.rpacan.com

 

 

The QP notes, however, that previous reports by Maxwell focusing on data prior to 2015 have been reviewed with only minor issues identified.

 

The results generated from the following QA/QC materials currently being used at Tucano have been reviewed:

Standards: Standards assays provide a measure of relative analytical precision. Sample batches which fall outside specified tolerance ranges are flagged and investigated.
Blank samples: Blank samples are inserted into the sample stream for both resource definition drilling, grade control drilling, and sampling programs at a frequency of approximately 2%
Laboratory Repeats (i.e. represents a second 50 g pulp sample taken from the first 200 g pulp).
Field Duplicates (i.e. represents a second 3 kg sample split taken from the original RC field sample interval. This sample is taken at the same time as the original sample).

 

Prior to Great Panther’s acquisition of Tucano in 2019, a total of eight datasets were available (four deposit areas) for two separate laboratories, with gold assaying completed by both the onsite laboratory and SGS Geosol. A total of six datasets were identified as relevant to this Technical Report. A large number of standards are available for review and a total of 47 have been deleted from the dataset due to low usage (<10 occurrences each). Those datasets were organized and migrated to the Acquire database in the beginning of 2019.

 

The QA/QC program completed by Great Panther for samples analysed in 2019 included samples collected from the resource definition drilling program and the grade control program comprised the following:

43 batches analyzed for drilling completed as part of the resource definition drilling program were sent to SGS Geosol.
517 batches analyzed for grade control drilling were assayed by the Great Panther onsite laboratory.
Three batches of samples that were sent to SGS Geosol were also sent to ALS Chemex for umpire assaying as part of the resource definition drilling program (SGS Geosol x ALS Chemex).

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 11-3
 www.rpacan.com

 

 

16 batches of samples assayed for grade control drilling by the Great Panther onsite laboratory were also sent to ALS Chemex for umpire assaying (Great Panther onsite laboratory x SGS Geosol).

 

A summary of the QA/QC samples used in 2019 is provided in Table 11-1.

 

Table 11-1 Summary of QA/QC Sampling, 2019

Great Panther Mining Limited - Tucano Gold Mine

 

Item Resource Definition Drilling Grade Control Program
Number Frequency Number Frequency
Standards 86 4% 676 3%
Blanks 43 2% 517 2%
Field Duplicates 44 2% N/A N/A
Assay Samples 1,787   21,574  

 

For resource definition, diamond drill holes were completed, and all samples sent to SGS Geosol with an Inter-Laboratory cross check at ALS Chemex. For grade control channel sampling, slope channel, RBA drill holes, and RC drill holes, all analyses were performed at the Great Panther onsite laboratory with an Inter-Lab cross check at ALS Chemex. All sample preparation was performed in the Tucano Preparation Lab that is handled by the Tucano Geology Team. The Tucano Geology Team typically had two separate preparation lines, one for resource definition and another for grade control.

 

Failure control consists of checking all received certificates from the laboratories and comparing the real value with the reference grade. If the real value is outside of the thresholds, the database manager investigates the total batch, contacts the responsible laboratory and makes an action plan to re-assay the batch. Figures 11-1 and 11-2 demonstrate that the failure rate is less than 5% in each batch.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 11-4
 www.rpacan.com

 

 

Figure 11-1 2019 CRMs Submitted to the SGS Chemex laboratory

 

 

Figure 11-2 2019 CRMs Submitted to the Onsite Laboratory

 

 

Blank Samples

Every batch contains blank samples (white quartz rock) in first position to verify the crusher cleaning between batches. The lower detection limits (LDL) are defined using 5% of a cut-off grade. Historically the cut-off grade was 0.52 g/t Au, so an LDL of 0.026 g/t Au was used for blank assays. Figures 11-3 and 11-4 show the resource definition blank control at SGS Chemex and the grade control blank control at the Great Panther onsite laboratory.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 11-5
 www.rpacan.com

 

 

Figure 11-3 2019 Blank Sample Results, Resource Definition Assaying (SGS Geosol)

 

Note: red line = 0.026 g/t Au

 

Figure 11-4 2019 Blank Sample Results, Grade Control Assaying (Tucano Gold Mine Lab)

 

Note: red line = 0.026 g/t Au

 

Certified Reference Materials

Tucano has used thirteen Geostats Pty industry certified reference materials (CRM) covering a range of gold grades from 0.37 g/t Au to 9.80 g/t Au, in sachets, inserted in batches sent to SGS Chemex and the Great Panther onsite laboratory. Table 11-2 shows the CRM material inserted in batches sent to SGS Chemex (average frequency 4.4%) and Table 11-3 shows the CRM material inserted in batches sent to the Great Panther onsite laboratory (average frequency of 3.0%).

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 11-6
 www.rpacan.com

 

 

Table 11-2 Total of Blind Reference Material Sent to SGS Chemex, 2019

Great Panther Mining Limited - Tucano Gold Mine

 

Standard

Best Value

(g/t Au)

Average

(g/t Au)

Total

Submitted

Number of

Failures

Failed % Bias %
G314-10 0.380 0.370 2 0 0.000 -2.703
G912-8 0.530 0.535 2 0 0.000 0.935
G913-1 0.820 0.823 4 0 0.000 0.304
G910-2 0.900 0.901 7 0 0.000 0.158
G914-3 1.240 1.285 2 0 0.000 3.502
G911-10 1.300 1.305 16 0 0.000 0.383
G315-3 1.970 2.022 11 1 9.091 2.563
G916-10 2.810 2.869 13 1 7.692 2.064
G912-6 4.080 4.183 6 0 0.000 2.470
G913-9 4.910 4.984 10 0 0.000 1.485
G913-10 7.090 7.236 5 0 0.000 2.018
G306-3 8.660 8.908 4 0 0.000 2.779
G914-7 9.810 9.783 4 0 0.000 -0.281
      86 2 2%  

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 11-7
 www.rpacan.com

 

 

Table 11-3 Total of Blind Reference Material Sent to Great Panther Onsite Laboratory, 2019

Great Panther Mining Limited - Tucano Gold Mine

 

Standard

Best Value

(g/t Au)

Average

(g/t Au)

Total

Submitted

Number of

Failures

Failed % Bias % Comments
G314-10 0.380 0.385 13 0 0.000 1.220 Little Information
G912-8 0.530 0.523 15 1 6.667 -1.326 Little Information One Failure.
G913-1 0.820 0.820 68 2 2.941 -0.027 Slight negative Bias. Two Failures.
G910-2 0.900 0.908 76 0 0.000 0.849 Positive Bias.
G914-3 1.240 1.279 30 2 6.667 3.064 Positive Bias. Two Failure.
G911-10 1.300 1.290 103 2 1.942 -0.807 Negative Bias. Two Failure.
G315-3 1.970 1.946 92 3 3.261 -1.250 Negative Bias. Three Failure
G916-10 2.810 2.828 103 3 2.913 0.652 Slight Positive Bias.
G912-6 4.080 4.018 29 0 0.000 -1.548 Little information.
G913-9 4.910 4.895 90 0 0.000 -0.309 Slightly negative Bias.
G913-10 7.090 6.932 51 1 1.961 -2.276 Negative Bias. 1 Failure.
G306-3 8.660 8.736 3 0 0.000 0.866 Little Information
G914-7 9.810 9.691 3 0 0.000 -1.228 Little Information
Total     676 14 2%    

 

The individual performance of all CRMs used to monitor the accuracy of assays indicates 2% failed samples and no significant bias due to the random distribution of the CRM. As examples, Figure 11-5 shows an example control chart of standard: G911-1 (1.30 g/t Au: +/- 0.05 ppm).

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 11-8
 www.rpacan.com

 

 

Figure 11-5 Sample Control Chart for CRM G911-1

 

 

Duplicate Samples

Tucano field duplicates are samples of diamond drill core cut in half that have been analyzed in the same laboratory (for resource definition, at SGS Geosol). Lab duplicates are pulp duplicates prepared in one laboratory, that have been sent to another laboratory (Inter-Lab) for check purposes. Resource definition used SGS Geosol as the primary laboratory and an Inter-Lab check was performed by ALS Chemex. Grade control used the Tucano laboratory as the primary laboratory and the Inter-Lab check was performed by SGS Geosol.

 

The field duplicates from DD sent to SGS Geosol (Figure 11-6) show good precision, the linear parity line is close mainly in the low grades and 90% of the pairs have a precision of less than 30%. In the QP’s opinion while this is not excellent it is satisfactory. One outlier, from within a fracture zone, was identified (original 3.05 g/t Au and duplicate 0.16 g/t Au) and was removed.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 11-9
 www.rpacan.com

 

 

Figure 11-6 Field Duplicate Charts (SGS Geosol vs ALS Chemex)

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 11-10
 www.rpacan.com

 

 

The Inter-Lab (Onsite x SGS Chemex) pulp duplicates (crushed material) from RC drilling - grade control (Figure 11-7), do not show good precision as the SGS Geosol results are systematically greater than the Great Panther onsite laboratory. While it seems that there is an underestimation of grades at the Great Panther onsite laboratory, according to the Great Panther onsite laboratory, the grades had good precision when compared with the production samples. The QP is of the opinion that the Tucano Geology Team has been reporting the bias and controlling this systematic difference. Between the Great Panther onsite laboratory x SGS Geosol reports, 90% of the pairs have a precision of less than 34%.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 11-11
 www.rpacan.com

 

 

Figure 11-7 Pulp Duplicate Charts (Tucano Gold Mine Laboratory vs SGS Geosol)

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 11-12
 www.rpacan.com

 

Discussion and Recommendations

In the QP’s opinion, the sample preparation, analysis, and security procedures at Tucano are adequate for use in the estimation of Mineral Resources.

 

In the QP’s opinion, the QA/QC program, as designed and implemented by Great Panther, is adequate and the assay results within the database are suitable for use in a Mineral Resource estimate.

 

The QP recommends that a program of assay to extinction be carried out to more fully understand the nature of the gold distribution of the mineralized samples.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 11-13
 www.rpacan.com

12 Data Verification

Personal inspections were carried out by RPA personnel during site visits conducted by Mr. Reno Pressacco, M.Sc.(A), P. Geo. and Mr. Goran Andric, P. Eng.

 

During his site visit, Mr. Pressacco visited the core shack where examples of the drill core and RC samples were reviewed, several examples of mineralization from both the Tap AB and Urucum deposits were inspected, the logging and sampling procedures were reviewed, and the density measurement facilities were inspected. Visits were made to several of the operating pits in the Urucum deposit where the nature of the mineralization was observed, the grade control and sampling procedures reviewed, and the operational capabilities of the loading units were observed. A visit was also made to several diamond drills operating in the area as part of the resource definition drilling program, where the drilling procedures were reviewed and discussed.

 

Mr. Pressacco also visited the plant stockpile area, as well as conducting a brief tour of the processing plant to inspect the sampling points used to determine the tonnages and grades processed. A visit was made to the site sample preparation facility as well as the site assay lab.

 

During his site visit, Mr. Andric had an opportunity to inspect the Tucano site, talk to mine personnel, and collect relevant information regarding a revised Mineral Reserve model, electronic drawings of pit designs and as-built surveys, mine productivity and cost reference data, and the mine planning procedures including the mine call factors used for conversion of in situ ore tonnage into run-of-mine (ROM) tonnage delivered to the mill.

 

In addition to personal inspections of Tucano, RPA carried out a program of validating the assay tables in the drill hole databases by means of spot checking a selection of drill holes that intersected gold mineralization for both the Tap AB and Urucum deposits. RPA proceeded to carry out its drill hole database validation exercise by comparing the information contained within the assay tables of the digital databases against the assays presented in the original laboratory certificates. Comparisons of the lithological information contained within the drill logs against the information contained within the digital databases were also carried out.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 12-1
 www.rpacan.com

 

 

Additional checks included a comparison of the drill hole collar locations with the digital models of the topographic surfaces and excavation models as well as a visual inspection of the downhole survey information.

 

The QP’s are of the opinion that the Tap AB and Urucum drill hole and chip sample data are adequate for the purposes of Mineral Resource and Mineral Reserve estimation.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 12-2
 www.rpacan.com

13 Mineral Processing and Metallurgical Testing

Summary

The existing Tucano gold processing plant was designed by Ausenco Limited (Ausenco). After approximately four years of operation, an expansion was planned, also by Ausenco, as part of the original Definitive Feasibility Study (DFS) to install a 3.0 MW ball mill.

 

This new secondary grinding mill, alongside the 7.0 MW single stage semi-autogenous grinding (SAG) mill, was installed in order to maintain 3.4 million tonnes per annum (Mtpa) throughput capacity treating 90% of the much harder sulphide ore type.

 

A tailings thickener was also envisaged in order to recycle cyanide rich solutions prior to detoxification. The plant flowsheet was modified in 2018 to deal with the harder sulphide ore type and the key features of these flowsheet changes are as follows:

An additional 6.0 MW ball mill to increase original Ausenco design capacity to 3.6 Mtpa and potentially obtain a finer product size of 80% < 75 μm at a higher proportion of sulphide ore to increase cyanide leach gold recovery and kinetics. Completed in September 2018.
A pre-leach thickener to allow both effective operation of the hydrocyclones which in turn provides higher leach feed pulp % solids. The change in philosophy from the originally proposed tailings thickener to a pre-leach thickener is explained further below. Completed in September 2018.
Additional leach residence time by adding one additional pre-leach tank to allow for the higher proposed plant capacity. Completed November 2018.
In November 2018, an oxygen plant was added to the CIL as proposed by Ausenco. An additional Liquid Oxygen plant was added in April 2019.

 

The mill sizing calculations were conducted by Ray Walton Consulting Inc. (RWC) and determined that a 4.0 MW mill should be adequate to grind the tonnages in the proposed mine plant to 80% passing (P80) 75 μm. However, a larger 6.0 MW ball mill was installed for the following reasons:

The selection of the smaller 4.0 MW ball mill assumes that the SAG mill and ball mills can operate continuously at 6.5 MW and close to 4.0 MW, respectively. This is difficult in practice. Selection of the larger 6.0 MW ball mill allowed optimization with some drift of the respective SAG mill and ball mill power draws. It is likely that the actual optimum power draws for the SAG mill and ball mill will be closer to approximately 4.0 MW and 6.0 MW, respectively.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 13-1
 www.rpacan.com

 

 

A 6.0 MW ball mill is a better suited to work alongside the 6.5 MW SAG mill. It is very unusual in SAG/ball mill grinding installations that the ball mill has a smaller motor than the SAG mill.
Future operations may decide to remove some of the current processing bottlenecks which limit production to 450 tonnes per hour (tph) (i.e., 3.6 Mtpa at 92% plant availability)
There is also some doubt as to the exact specific energy of all the sulphides. Selection of a 6.0 MW mill will ensure the treatment rate is maintained if harder sulphide ore is mined.
Selection of a 6.0 MW mill allows some standardization of mill components with the existing Outotec SAG mill.

 

The hydrocyclones were not operating effectively, which was adversely affecting grind size and gold recovery. The installation of the pre-leach thickener is an absolute necessity to de-couple the operation of the grinding circuit and hydrocyclones from the downstream pre-leach and CIL circuit. The resultant higher % solids in the leach circuit feed will increase residence times and decrease cyanide consumptions. As a consequence, the original tailings thickener proposed by Ausenco was replaced by this pre-leach thickener.

 

At a plant throughput of 450 tph and a slurry density of 45% solids, a total volume of 17,200 m3 is required to provide a leach residence time of 24 hours. The existing CIL provides 15,400 m3; therefore, one additional leach tank, 15 m x 15 m in size is required. The new tank will be located ahead of the existing CIL tanks and used for pre-leaching. This allows a major proportion of gold to go into solution before the resultant pregnant solution comes into contact with the carbon, which will speed up adsorption kinetics.

 

The aforementioned changes were executed and commissioned by November 2018.

 

Historical Plant Performance

Plant Throughput

Figure 13-1 shows the 2016 to 2019 plant throughput and availability trends and Figure 13-2 shows the amount of sulphide ore in the overall ROM blend fed to the plant. The average plant throughput from 2016 to 2018 was 3.6 Mt containing an average of 17% sulphide ore in the blend.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 13-2
 www.rpacan.com

 

 

Tucano commissioned a new oxygen plant in April 2019 which allowed the processing of higher amounts of sulphide ore in the blend, which averaged 95.3% of sulphide ore from May to December 2019. The increased amount of sulphide ore did not affect metallurgical recoveries, but the hardness of the sulphide ore negatively impacted the primary crusher.

 

Figure 13-1 % Sulphide Ore Processed (2016 to 2019)

 

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 13-3
 www.rpacan.com

 

 

Figure 13-2 % Sulphide Ore Processed (2016 to 2019)

  

 

Plant availability in 2019 was adversely affected by issues with the power line, issues in the plant due to excessive crushing liner wear, and crusher issues due to its dated nature and high frequency of SAG mill liner breakages

 

The plant personnel worked extensively with Metso, Hardox, Fornac, and other liner suppliers to redefine liner design and also to test different materials to extend the life of the liners. These issues were rectified in Q4 2019. The plant availability during the period from November 2019 to December 2019 was extremely good (> 95%), however, the average for 2019 was low at 88.9%. For reference, the 2017 and 2018 plant availability were 94% (Figure 13-3).

 

Tucano has also started detailed engineering work to replace the primary crusher with a new Metso C-150 crusher, which is scheduled for replacement in June 2020.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 13-4
 www.rpacan.com

 

 

Figure 13-3 % Plant Availability (2016 to 2019)

 

 

 

Plant Metallurgical Recovery and Oxygen

Historical plant performance focussed on pre- and post-April 2019 when the dissolved oxygen (DO) in the pulp in leach tank one was increased to more than 15 parts per million (ppm) DO, as originally recommended by Ausenco for sulphide ore types. Figure 13-4 demonstrates how the % sulphide ore being processed increased significantly after April 2019.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 13-5
 www.rpacan.com

 

 

Figure 13-4 % Gold Recovery (2016 to 2019)

 

 

 

Figure 13-5 shows the increase in the percentage of total gold recovery achieved in CIL Tank 1 alone. This clearly demonstrates that gold recovery kinetics have been significantly increased by the increased DO levels. Approximately, 85% of the gold is in solution in CIL Tank 1 already, which will vastly improve carbon adsorption kinetics and reduce soluble losses and reliance on downstream tanks for further gold dissolution.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 13-6
 www.rpacan.com

 

 

Figure 13-5 Gold Recovery in CIL Tank 1

 

 

 

Figure 13-6 shows how the gold recovery has increased in relation to grade in the plant feed. The gold recovery is now approximately 5% higher than pre-April 2019 and is more consistent since there is less random scatter.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 13-7
 www.rpacan.com

 

 

Figure 13-6 Relationship Between g/t Au and % Gold Recovery

 

 

 

Figure 13-7 below shows the improvement in the percentage of particles that are less than 75 µm in the leach feed and the finer particle size will be amenable to gold leaching.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 13-8
 www.rpacan.com

 

 

Figure 13-7 Size of Leach Feed (2016 to 2019)

 

 

 

Cyanide Consumption

Figure 13-8 shows the 2016 to 2019 cyanide consumption trends. The actual cyanide consumption rates are an order of magnitude higher than those achieved during the Ausenco DFS study.

 

The main reason for the higher cyanide consumption is the presence of pyrrhotite and other iron bearing minerals which solubilize on contact with water. Fe2+ ions consume cyanide and it is therefore important that Fe2+ ions are oxidized to Fe3+ ions, since Fe3+ ions do not consume cyanide. The addition of higher levels of oxygen has significantly increased gold recovery, however, cyanide consumption rates have remained high.

 

Further research and development work are currently being planned to ascertain the optimum plant set up to manage oxygen and cyanide consumption.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 13-9
 www.rpacan.com

 

 

Figure 13-8 Cyanide Consumption Rates (2016 to 2019)

 

 

Test Work Review

As described in the 2017 AMC Technical Report, three separate metallurgical test work programs have been carried out:

Amapari work program by New Gold (original heap leach).
Ausenco FS program by Ausenco and Ammtec Limited (Ammtec) (original mill).
Beadell FS program by Beadell and their consultants, RWC for the mill expansion and MPH Minerals Consultancy Ltd (MPH) for the Metallurgical Accounting and original Ausenco metallurgical test work review and interpretation of project test work needs.
The Amapari program by New Gold was focused on a heap leach operation and is not relevant to the grind and cyanidation process later adopted by Beadell.

 

The bulk of the test work to support the design of the original mill was carried out by Ausenco and Ammtec. This was later supplemented by an operations review and other test work at SGS Geosol to support the design of the expansion, and supervised by Beadell. The latter two programs are summarized below.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 13-10
 www.rpacan.com

 

 

Ausenco FS Metallurgical Program

A detailed metallurgical test work program was conducted to support the initial FS for Tucano. The program was supervised by Ausenco and was carried out by Ammtec in Perth, Western Australia, during the second half of 2010. It included test work to establish:

The comminution characteristics of four main ore type composite samples of Tap AB oxide, Tap AB sulphide, Urucum oxide, and Urucum sulphide, and 15 variability samples.
The optimum grind size and cyanidation conditions for the four main ore type composite samples.
The gravity recovery response of the four main ore type composite samples.
The leach performance of 29 variability samples, including five Tap C oxide, two Tap C, sulphide, and two Tap D oxide ores.
The leach performance of eight samples of spent ore (heap leach tailings) and two samples of stockpiled low grade ore.
Engineering data that included testing of oxygen uptake, carbon kinetics, slurry viscosity, and lime demand.
The performance of air/SO2 process and hydrogen peroxide (H2O2) for cyanide destruction.
The mineralogy of the four main ore type composites.

 

In addition, Ammtec prepared samples for dispatch to:

Coffey International Limited to establish physical characteristics of plant tailings.
ALS Environmental to establish geochemical characteristics of plant tailings.
FLSmidth Pty Ltd for thickening test work.

 

Beadell FS Metallurgical Program

In mid 2016 Beadell, together with their consultants and RWC, reviewed the operation of the plant with specific emphasis on the low gold recovery and coarser grind that was being experienced at the time. MPH provided specific guidance on metallurgical accounting and reviewed metallurgical test work needs. RWC reviewed the plant operating data and compared the data with the original mill design. It was concluded that certain critical areas required attention, and this was defined under the expansion project as follows:

Additional grinding power to be provided by an additional ball mill.
A pre-leach thickener to allow both effective operation of the cyclones and adequate retention time in CIL.
Additional leach residence time.
Oxygen addition to CIL.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 13-11
 www.rpacan.com

 

 

Lead nitrate addition to CIL.

 

Testwork Process Development Ltd.

In mid 2016, samples were submitted by Beadell to Testwork Process Development Ltd. for bottle roll testing as follows: Urucum sulphide, Urucum Oxide, Tap AB 2 oxide, Tap AB 3 sulphide, Tap AB 2 transition, and spent ore.

 

Leaching curves of gold recovery versus time were produced, with and without oxygen addition. The source of the samples was not recorded. Generally, the results were highly variable and, not as expected, therefore, an additional test program at SGS Geosol was planned.

 

This work was planned and initiated by Beadell.

 

SGS Geosol

In January 2017, a more definitive metallurgical test program was initiated by Beadell. Ten composites were prepared, nine sulphide composites and one oxide composite, and were submitted to SGS Geosol for bottle roll testing as listed in Table 13-1.

 

Table 13-1 SGS Geosol Samples

Great Panther Mining Limited - Tucano Gold Mine

 

Metallurgical Test Composite Lode Description Mine Pit
BDRMET1 AB 1 Flat Sulphide Tap AB Tap AB 1
BDRMET2 AB 1 Trough Oxide Tap AB Tap AB 1
BDRMET3 AB 2 Sulphide Tap AB Tap AB 2
BDRMET4 AB 3 Sulphide Tap AB Tap AB 3
BDRMET5 URS Sulphide Urucum Urucum South (URS)
BDRMET6 URCS Sulphide Urucum Urucum Central South (URCS)
BDRMET7 URCN SIB Sulphide Urucum Urucum Central North (URCN)
BDRMET8 URCN SCS Sulphide Urucum Urucum Central North (URCN)
BDRMET9 URN Sulphide Urucum Urucum North (URN)
BDRMET10 URN UG Sulphide Urucum Urucum North Underground (URN UG)

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 13-12
 www.rpacan.com

 

 

A summary of the selected drill hole intervals used to select the samples and sections showing the drill hole locations, within the proposed open pit, was provided. The metallurgical results are summarized in Table 13-2.

 

Table 13-2 SGS Geosol Bottle Roll Results

Great Panther Mining Limited - Tucano Gold Mine

 

Metallurgical Test Composite

Grade

(g/t Au)

53 μm 75 μm 106 μm
BDRMET1 2.17 98.3 94.9 96.7
BDRMET2 2.41 96.6 96.1 97.6
BDRMET3 2.91 94.6 94.2 91.6
BDRMET4 2.81 97.3 95.7 97.6
BDRMET5 3.44 91.5 91.3 90.3
BDRMET6 2.48 90.4 93.0 91.0
BDRMET7 2.19 96.1 93.6 91.1
BDRMET8 7.14 97.6 95.7 91.9
BDRMET9 1.52 91.2 88.9 88.5
BDRMET10 5.71 96.5 95.7 93.2
Average 3.28 95.0 93.9 93.0

 

Leaching curves of gold recovery versus time were produced at various grind sizes. The data was analysed by Beadell and their consultants and it was concluded that a residence time of 24 hours and a grind size of P80 75 μm was optimum. Although it can be seen that recoveries were higher at P80 53 μm than at P80 75 μm, the calculations carried out to determine the optimum grind size, demonstrated that the net operating revenues at both grind sizes were similar. According to plant experience, recoveries fall significantly with grinds coarser than P80 106 μm.

 

Oxygen Test Work Summary

The original test work conducted by ALS Ammtec in Perth involved testing all ore types at two DO levels, 6 ppm using air and 25 ppm using oxygen sparging. The aim was to identify the effect of oxygen on the leach kinetics and cyanide consumption rates. The conclusions from this test work were that all oxide ore type testing would employ 6 ppm (i.e., natural air aspiration), while the sulphide ore types required much higher oxygen demands and much higher ppm DO.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 13-13
 www.rpacan.com

 

 

The Ausenco design provided for just air (no oxygen) injection in the first four years of mine life, while the oxide ore types were being treated, but Ausenco recommended greater than 15ppm DO when treating sulphide ore types.

 

Conclusions and Design Criteria

The conclusions and design criteria from the two test work programs, i.e., the Ausenco and Ammtec FS and the Beadell FS, are described separately as follows.

 

Ausenco and Ammtec FS Program

Conclusions drawn from the Ausenco and Ammtec FS test work program are given below.

The oxide and sulphide ores have very dissimilar physical and comminution characteristics.
The oxide ore has very low competency and low-to-average hardness, whereas the sulphide ores are competent to very competent and average to above average hardness. Co-processing of these ores is best suited to a SAG mill. A single-stage SAG mill is recommended for the first few years, when a high-oxide low-sulphide blend is planned. A ball mill is to be added around Year 4 when the sulphide content of the blend is expected to rise.
Gravity test work in the laboratory showed a high recovery (35% to 56%) of gold by centrifugal gravity concentration and intensive cyanidation of gravity concentrate. However, the overall gold recovery, including leaching of gravity tails, showed no recovery improvement in recovery over a whole ore leach. Therefore, the gravity circuit was not included in the processing plant design in order to reduce capital costs.
The Tucano ores are free-milling and are not preg-robbing. They are amenable to gold extraction by conventional CIP cyanidation. As a group, the oxide ores respond in a similar manner to each other, giving very high recoveries (typically greater than 95%) at a grind size of P80 75 μm, with moderate reagent consumptions of 0.55 kg/t NaCN and 5.5 kg/t lime (60% CaO). Despite the ores showing no preg-robbing characteristics, CIL was selected because it was the lowest capital cost. The original elution circuit inherited by Beadell from New Gold’s heap leach operation was retained again to minimise capital costs.
The sulphide ores also have high recoveries, but typically 3% lower than oxide ores, at a grind size of P80 75 μm, and moderate reagent consumptions of 0.49 kg/t NaCN and 0.57 kg/t lime (60% CaO).
The spent ore samples stockpiled from the previous heap leach operation had a recovery of 87% at a grind size of P80 75 μm, the low grade ore stockpiled during the previous heap leach operation exhibited a recovery of 93.5% at a grind size of P80 75 μm.
Oxygen addition increases the leaching kinetics, primarily for the sulphide ores. The use of oxygen is recommended for the high sulphide ore blends planned for the fourth year of operation.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 13-14
 www.rpacan.com

 

 

Lead nitrate (Pb(NO3)2) addition (at 100 g/t) appears to increase the kinetics of gold leaching for Tap AB oxide material, such that extractions previously achieved at 48 hours are achieved at between 12 hours and 24 hours.
The planned Tucano ore blends both have thickener specific settling rates of 1.2 t/m2. The high sulphide blend requires 5 g/t to 7.5 g/t of flocculant and should achieve thickener underflow solids concentration of 60% to 62% solids. By comparison, the high oxide blend would require twice as much flocculant and would be expected to achieve a thickener underflow solids concentration of 50% to 52% solids.
The air/SO2 cyanide destruction process can be used to reduce cyanide in CIL tailings slurry to less than 3 ppm CNWAD and less than 25 ppm CNTOTAL.

 

The process design criteria recommended from this test work program by Ausenco are summarized in Table 13-3.

 

Table 13-3 Selected Design Criteria (Ausenco)

Great Panther Mining Limited - Tucano Gold Mine

 

Parameter Unit Oxide Sulphide
Comminution      
Bond Rod Mill Work Index kWh/t 7.9 20.0
Bond Ball Mill Work Index kWh/t 11.3 16.8
Bond Abrasion Index kWh/t 0.03 0.43
JK Parameter A x b   192 34.9
Ore Specific Gravity (SG)   3.57 3.27
Grind Size, P80 µm 75 75
CIL      
CIL Residence Time h 24 24
Residual CNFREE Level mg/L 100 100
Tails Thickening      
Specific Settling Rate t/m2h 1.2 1.2
Underflow Density % w/w 50-52 60-62
Cyanide Destruction      
Operating pH   8.5-9.0 8.5-9.0
Suggested Residence Time h 1 1
CIL Residual CNWAD Level mg/L 110 110
Tailings CNWAD mg/L <50 <50
Tailings CNWAD (Target) mg/L <10 <10
Solution Discharge CNTOTAL Limit mg/L <0.2 <0.2

 

Beadell FS Program

The relevant studies and evaluations carried out by Beadell and their consultants are summarized in detail in the Beadell FS. An alternative expansion strategy to the original Ausenco FS was recommended to maintain adequate throughput and recovery and this strategy was carried out under the Beadell FS as follows:

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 13-15
 www.rpacan.com

 

 

The nominal throughput would be 3.6 Mtpa, 10,000 tonnes per day (tpd), or 450 tph of predominantly sulphide ore, at a grind size of P80 75 μm.
The new equipment would comprise a 6 MW ball mill, a 28 m diameter pre-leach thickener, and an additional leach tank, located ahead of the existing CIL.
An oxygen plant would also be included.

 

The design, sizing, and location of each new item of equipment are described below.

 

Ball Mill

The SRK Report, included in the Beadell FS, contains a description of the plant trials, mill sizing, and power requirement calculations. The conclusion was that to achieve the optimum grind size of P80 75 μm, 7.1 kWh/t for oxide and 24.6 kWh/t for sulphide, would be required. The mill sizing calculations by RWC and SRK have determined that a 4.0 MW mill should be adequate to grind the tonnages in the proposed plant to P80 75 μm, however, a larger 6.0 MW ball mill is recommended, the reasons for which were outlined earlier.

 

Pre-Leach Thickener

In the current operation, the cyclones are operating inefficiently due to the high viscosity of the feed slurry. Operating experience shows that the actual grind size currently being achieved is between P80 110 μm and P80 150 μm. The high viscosity of the feed slurry resulted from a need to maintain a high percentage of solids in the cyclone overflow, which fed the leach circuit directly and this was required to maintain adequate residence times in the CIL process. Therefore, it was recommended by Beadell and their consultants to install a pre-leach thickener and a 28 m diameter thickener was selected.

 

Thickening tests were conducted by Outotec during the Beadell FS. This thickener will provide two functions:

Allow the cyclones to be operated at a lower percentage of solids and thus, classify more effectively at the optimum grind size of 75 μm.
Provide a slurry at a higher percentage of solids to the new leach tank and CIL process, and hence maintain adequate residence times.

 

Additional Leach Tank

At a throughput of 450 tph and a slurry density of 45% solids, a total volume of 17,200 m3 is required to provide a leach residence time of 24 hours. The existing CIL process has a total volume of 15,400 m3, therefore, one additional tank, 15 m x 15 m in size, is required. The additional leach tank will be located ahead of the existing CIL tanks.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 13-16
 www.rpacan.com

 

 

Reagents

The benefits of lead nitrate addition are shorter leach time and reduced cyanide consumption, particularly on the oxide ores, as highlighted by MPH Metallurgical Testwork Review. Additions fall in the range of 100 g/t to 250 g/t as lead nitrate. A design figure of 150 g/t has been selected and a lead nitrate mixing, and dosing plant has already been installed.

 

RWC estimated oxygen consumption using benchmarks from other operations and feedback from discussions with companies specializing in oxygenation. These oxygen consumption figures were checked against the previous experience of personnel at Tucano. These benchmarks were also compared against typical specific aeration rates that were adjusted for the improved mass transfer efficiency experienced with oxygen. A final check was made against an oxygen uptake rate measured using DO meters on slurries during a previous test work program. A plant capacity of 7.5 tpd of oxygen was recommended, i.e., approximately 0.75 kg of oxygen per tonne of slurry.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 13-17
 www.rpacan.com

14 Mineral Resource Estimate

Summary

The Mineral Resources for Tucano include contributions from four deposits as well as material contained within various stockpiles present throughout the Tucano property. The Mineral Resources from these four deposits are composed of mineralized material that is envisioned to be extracted by both open pit and underground mining methods. Gold mineralization is contained within oxidized lithologies as well as their fresh, un-weathered equivalents.

 

Updated grade-block models were prepared for the open pit component of the Urucum deposit, as well as the open pit and the underground component of the Tap AB deposit using drill hole, sample information, and topography that was current as of September 30, 2019. The underground component of the Mineral Resource estimate for the Urucum North deposit was prepared from a grade-block model that used the drill hole and sample information that was current as of November 2, 2015. Drilling completed since the previous Technical Report (AMC, 2017) was reviewed and in RPA’s opinion does not materially impact the Mineral Resource estimate.

 

The Mineral Resource estimate for the Tucano as of September 30, 2019 is presented in Table 14-1.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-1
 www.rpacan.com

 


Table 14-1   Mineral Resource Estimate as of September 30, 2019
Great Panther Mining Limited - Tucano Gold Mine

 

 

  Cut-off Grade (g/t Au) Measured Indicated Total Measured & Indicated Inferred
Tonnage
(000)

Grade

(g/t Au)

Contained

Metal

(000 oz Au)

Tonnage
(000)

Grade

(g/t Au)

Contained
Metal

(000 oz Au)

Tonnage
(000)

Grade

(g/t Au)

Contained
Metal

(000 oz Au)

Tonnage
(000)

Grade

(g/t Au)

Contained
Metal

(000 oz Au)

OXIDE OPEN PIT                        
Urucum 0.40 109 1.11 4 27 1.54 1 136 1.20 5 0 0.00 0
Urucum East 0.40 0 0.00 0 143 2.09 10 143 2.09 10 0 0.00 0
Tap AB 0.40 0 0.00 0 1,099 2.27 80 1,099 2.27 80 0 0.00 0
Duckhead 0.40 0 0.00 0 64 4.35 9 64 4.35 9 6 1.71 0
Total Oxide Open Pit 0.40 109 1.11 4 1,333 2.34 100 1,442 2.24 104 6 1.71 0
FRESH OPEN PIT                        
Urucum 0.55 1,667 1.80 96 2,561 2.30 190 4,228 2.10 286 7 3.94 1
Urucum East 0.55 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0
Tap AB 0.55 0 0.00 0 508 2.45 40 508 2.45 40 0 0.00 0
Duckhead 0.55 0 0.00 0 118 2.06 8 118 2.06 8 5 4.14 1
Total Fresh Open Pit 0.55 1,667 1.80 96 3,188 2.32 238 4,855 2.14 334 12 4.03 2
OPEN PIT OXIDE AND FRESH                          
Urucum   1,775 1.76 100 2,589 2.30 191 4,364 2.08 291 7 3.94 1
Urucum East   0 0.00 0 143 2.09 10 143 2.09 10 0 0.00 0
Tap AB   0 0.00 0 1,607 2.33 120 1,607 2.33 120 0 0.00 0
Duckhead   0 0.00 0 183 2.87 17 183 2.87 17 12 2.79 1
Total Oxide & Primary Open Pit   1,775  1.76 100 4,521 2.32 338 6,296 2.16 438 18 3.21 2
STOCKPILE                          
Open pit stockpile 0.50 1,887 0.71 43 0 0.00 0 1,887 0.71 43 0 0.00 0
Spent ore stockpile 0.50 37 0.70 1 0 0.00 0 37 0.70 1 0 0.00 0
Rom expansion stockpile 0.50 522 0.70 12 0 0.00 0 522 0.70 12 0 0.00 0
Marginal ore stockpiles 0.30 1,340 0.42 18 0 0.00 0 1,340 0.42 18 0 0.00 0
Total Stockpiles   3,786 0.61 74 0 0.00 0 3,786 0.61 74 0 0.00 0
Total Tucano Open Pit & Stockpiles   5,562  0.97 174 4,521 2.32 338 10,083 1.58 512 18 3.21 2
                                 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-2
 www.rpacan.com

 

 

  Cut-off Grade (g/t Au) Measured Indicated Total Measured & Indicated Inferred
Tonnage
(000)

Grade

(g/t Au)

Contained
Metal

(000 oz Au)

Tonnage
(000)

Grade

(g/t Au)

Contained
Metal

(000 oz Au)

Tonnage
(000)

Grade

(g/t Au)

Contained
Metal

(000 oz Au)

Tonnage
(000)

Grade

(g/t Au)

Contained
Metal

(000 oz Au)

OXIDE UNDERGROUND                         
Urucum - North 2.10 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0
Urucum - Central 2.10 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0
Urucum East 2.10 0 0.00 0 0 0.00 0 0 0.00 0 12 2.72 1
Tap AB 2.10 0 0.00 0 174 4.94 28 174 4.94 28 1,436 2.33 108
Duckhead 2.10 0 0.00 0 0 0.00 0 0 0.00 0 33 4.20 5
Total Oxide Underground 2.10 0 0.00 0 174 4.94 28 174 4.94 28 1,481 2.38 113
FRESH UNDERGROUND                        
Urucum - North 1.60 0 0.00 0 3,042 4.04 395 3,042 4.04 395 4,664 2.12 318
Urucum - Central 1.60 0 0.00 0 0 0.00 0 0 0.00 0 852 2.61 71
Urucum East 1.60 0 0.00 0 0 0.00 0 0 0.00 0 88 2.03 6
Tap AB 1.60 0 0.00 0 184 4.33 26 184 4.33 26 4,331 2.06 287
Duckhead 1.60 0 0.00 0 0 0.00 0 0 0.00 0 230 2.05 15
Total Oxide Underground 1.60 0 0.00 0 3,225 4.06 421 3,225 4.06 421 10,165 2.13 697
UNDERGROUND OXIDE AND FRESH                        
Urucum - North   0 0.00 0 3,042 4.04 395 3,042 4.04 395 4,664 2.12 318
Urucum - Central   0 0.00 0 0 0.00 0 0 0.00 0 852 2.61 71
Urucum East   0 0.00 0 0 0.00 0 0 0.00 0 100 2.11 7
Tap AB   0 0.00 0 357 4.63 53 357 4.63 53 5,767 2.13 395
Duckhead   0 0.00 0 0 0.00 0 0 0.00 0 263 2.32 20
Total Oxide & Primary Underground  0 0.00 0 3,399 4.10 448 3,399 4.10 448 11,646 2.16 810
Grand Total Tucano   5,562 0.97 174 7,920 3.09 786 13,482 2.22 960 11,664 2.16 812

 

Notes:

1.CIM (2014) definitions were followed for Mineral Resources.
2.Mineral Resources are estimated at various cut-off grades depending on mining method and mineralization style.
9.Mineral Resources are estimated using a long-term gold price of US$1,500/oz Au and a US$/Brazilian real (R$) exchange rate of 1:3.8.
3.A minimum mining width of 3 m was used for preparation of mineralization wireframes for the Urucum open pit and Tap AB open pit and underground Mineral Resources.
4.Mineral Resources are inclusive of Mineral Reserves.
5.Mineral Resource statements are prepared using constraining surfaces and volumes for open pit and underground Mineral Resources, respectively.
6.Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.
7.Numbers may not add due to rounding.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-3
 www.rpacan.com

 

Urucum Deposit

Open Pit

Topography and Excavation Models

Great Panther prepares digital models of the open pit mining excavations on a regular basis as mining progresses using information collected from drone surveys as well as conventional total station surveying equipment. The information collected from these period surveys are integrated together from the various mining areas at the Urucum deposit into one integrated model of the as-mined topographic surface. A digital copy of the as-mined topographic surface was provided to RPA for the Urucum deposit that was current as of September 30, 2019 (Figure 14-1).

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-4
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-5
 www.rpacan.com

 

 

Mineral Resource Database

The presence and distribution of the gold mineralization found at the Urucum deposit is defined by means of diamond drill holes, auger holes, and RC drill holes completed during deposit delineation drilling programs, and RC drill holes, chip/channel samples, RAB hole samples and blast hole samples taken as part of the grade control sampling program. All information is entered into a master acQuire geological database management system which stores all drill hole and sample information for the Mine.

 

Subsets from this master database were extracted by the Mine staff and used for preparation of the Urucum Mineral Resource estimate. All the drill holes contained within the Urucum subset of the database were used to prepare the estimate. All the drill hole data were modified for use by the Datamine Studio mine modelling software package. Additional fields to store such information as the composited assay values and wireframe flags were created as required during preparation of the Mineral Resource estimate.

 

The cut-off date for the drill hole database is September 30, 2019. The location of the drill holes which were used to prepare the 2019 Mineral Resource estimate were shown in Section 10 of this Technical Report. The drilling has outlined gold mineralization along a strike length of approximately 2,300 m and from surface to depths of up to 600 m from surface at the Urucum North deposit. A summary of the database is provided in Table 14-2.

 


Table 14-2   Summary of the Urucum Drill Hole Database as of September 30, 2019
Great Panther Mining Limited - Tucano Gold Mine

 

Hole Type Number of Holes Total Length (m)
Auger (AG) 1,670 8,442
Chip/Channel (CH) 3,530 77,537
Diamond Drilling (DD) 405 96,196
Rotary Air Blast (RB) 2,995 25,415
Reverse Circulation (RC) 4,577 183,861
Trench Samples (TR) 151 4,351
Total 13,328 395,802

 

Lithology Model

Digital models of the main host rock types encountered at the Urucum deposit were prepared by the Mine staff using a series of vertical, east-west cross sections that were equally spaced at 10 m intervals. The Hexagon Minesight software package was used to create the interpretations of the lithological and weathering units.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-6
 www.rpacan.com

 

 

The main rock types include BIF, a carbonate unit, quartz-sericite schist, and pegmatite (Figure 14-2). The BIF unit has been the host to the majority of the gold mineralization to date, although minor quantities of gold are also hosted by the carbonate unit. Excluding the pegmatite units, all rock units strike in a general north-south direction and have sub-vertical or steep easterly dips. Visual inspection of the pegmatite units by RPA during its visit to the Tucano site suggests that these units have not been subjected to the same degree of regional metamorphism and deformation, and so may represent a post-mineralization intrusion event (Figure 14-3).

 

RPA recommends that the adjacent lithologies to the BIF and carbonate units be evaluated for their potential of hosting significant quantities of gold mineralization.

 

RPA recommends that the genetic and temporal relationships between the gold mineralization and the pegmatite units be determined.

 

A digital model of the nominal top of the fresh rock has been prepared using available information obtained from drill holes and mining activities. The depth of weathering in the area of the Urucum deposit varies at the detailed scale but is generally in the order of 50 m (Figure 14-4). This weathering unit is topped off by the presence of a colluvium layer that represents weathered material that has been re-worked or transported by secondary processes such as erosion or mass flow events. The depth of this colluvium layer varies at the detailed scale but is generally in the order of 10 m in depth.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-7
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-8
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-9
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-10
 www.rpacan.com

 

 

Mineralization Models

Gold mineralization at the Urucum deposit is sub-divided into four segments referred to as the Urucum South (URS), Urucum Central South (UCS), Urucum Central North (UCN), and Urucum North (URN) deposits. Digital interpretations of the distribution of the gold mineralization for these four segments were prepared by RPA using the Leapfrog software package. In general, the interpretations were created by examining drill hole and channel sample information in cross sectional views. The mineralization wireframes (referred to as Lodes by Mine staff) were based on a series of interpretations created by Mine staff in earlier years but updated to incorporate additional exploration and grade control drill hole and channel sample information. The updated mineralization wireframes were created using a nominal cut-off grade of 0.5 g/t Au across a minimum width of three metres to align with the cut-off grade and minimum width criteria that are currently being employed by the Mine staff for establishing the ore/waste dig packets. It is important to note that the cut-off grade of 0.5 g/t Au represents a pit-discard cut-off grade, which considers processing and general and administration (G&A) costs only. In all, a total of 32 mineralized wireframes were created for the four mineralized segments (Table 14-3). Examples of the interpretations were presented in Section 10. In total, gold mineralization has been modelled along a strike length of approximately 2,300 m and to a depth of approximately 600 m from surface.

 

RPA recommends that a second series of wireframe interpretations be prepared for the Urucum deposit using cut-off grade and minimum width criteria that are reflective of the envisioned operational scenario for an underground mining operation.

 


Table 14-3   Summary of the Mineralized Wireframes - Urucum Deposit
Great Panther Mining Limited - Tucano Gold Mine

 

Zone Number of Lodes
Urucum South (URS) 10
Urucum Central (North and South) 15
Urucum North (UCN) 7

 

Exploratory Data Analysis and Grade Capping

Analyses of the gold grade distributions were conducted for those sample assays contained within the mineralized wireframes for each of the three zones. These analyses included preparation of descriptive statistics along with examination of the grade distribution by means of upper tail histogram plots, decile analyses, and Parrish plots. The purpose of this exercise was to identify whether any outlier gold values are present whose influence on the Mineral Resource estimate must be restrained.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-11
 www.rpacan.com

 

 

Review of the results of these analyses suggests that an appropriate capping value is approximately 12 g/t Au for the Urucum South mineralization, approximately 20 g/t Au for the Urucum Central mineralization, and approximately 15 g/t Au for the Urucum North mineralization. In comparison, the capping value applied to the raw assays for creation of the short term grade control block models is 26 g/t Au for all three zones. A summary of the descriptive statistics for the capped and uncapped raw assays, along with a brief review of the impact of alternate capping values, is presented in Table 14-4.

 

Figure 14-5 Upper Tail Histogram - Urucum South Deposit

 

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-12
 www.rpacan.com

 

 

Figure 14-6 Upper Tail Histogram - Urucum Central Deposit

 

 

 

Figure 14-7 Upper Tail Histogram - Urucum North Deposit

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-13
 www.rpacan.com

 

 


Table 14-4   Descriptive Statistics of Capped and Uncapped Raw Assays
Great Panther Mining Limited - Tucano Gold Mine

 

Urucum South
Item

No

Cap

Cap 12

(g/t Au)

Cap 10

(g/t Au)

Length-Weighted Mean 1.68 1.61 1.57
Median 0.77 0.77 0.77
Mode 0.01 0.01 10.00
Standard Deviation 2.79 2.32 2.15
CoV - LW 1.66 1.44 1.37
Sample Variance 7.77 5.36 4.63
Minimum 0.00 0.00 0.00
Maximum 47.58 12.00 10.00
Count 3,699 3,699 3,699
Urucum Central
Item

No

Cap

Cap 20

(g/t Au)

Cap 15

(g/t Au)

Length-Weighted Mean 1.65 1.58 1.54
Median 0.63 0.63 0.63
Mode 0.01 20.00 15.00
Standard Deviation 3.56 2.78 2.53
CoV-LW 2.16 1.75 1.64
Sample Variance 12.66 7.70 6.40
Minimum 0.00 0.00 0.00
Maximum 146.32 20.00 15.00
Count 32,929 32,955 32,955
Urucum North
Item

No

Cap

Cap 15

(g/t Au)

Cap 10

(g/t Au)

Mean 1.12 1.02 0.97
LW Mean 1.11 1.02 0.97
Median 0.43 0.43 0.43
Mode 0.02 0.02 0.02
Standard Deviation 3.22 1.93 1.63
CoV-Arithmetic 2.88 1.90 1.69
CoV-LW 2.89 1.90 1.68
Sample Variance 10.34 3.72 2.67
Minimum 0.00 0.00 0.00
Maximum 121.07 15.00 10.00
Count 24,125 24,209 24,209

 

RPA recommends that the capping value applied to the short term grade control block model be reviewed in consideration of all available drill hole and sample information, as well as all information collected from the plant reconciliation studies.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-14
 www.rpacan.com

 

 

Compositing

The selection of an appropriate composite length began with examination of the descriptive statistics of the sample lengths of the raw assays and preparation of histograms of the sample lengths. Consideration was also given to the size of the blocks that would be used in the block model.

 

The majority of the sample lengths in the various mineralized wireframes were found to be one metre in length, with a small percentage of the samples having larger sample lengths (Figure 14-8). Consequently, on the basis of the available information, RPA believes that a composite length of one metre is reasonable.

 

The capped raw assays were composited individually for each of the 32 mineralized wireframes using either the best-fit function or the equal length function of the Datamine Studio 3 software package. The descriptive statistics of the composite samples for each of the 32 mineralized wireframes are provided in Table 14-5.

 

Figure 14-8 Histogram of Sample Lengths - Urucum Central Deposit

 

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-15
 www.rpacan.com

 

 


Table 14-5   Descriptive Statistics of Capped and Uncapped Composited Assays
Great Panther Mining Limited - Tucano Gold Mine

 

Urucum North
  Lode 22 Lode 23 Lode 24 Lode 25 Lode 27 Lode 28 Lode 29  
Item No Cap Capped No Cap Capped No Cap Capped No Cap Capped No Cap Capped No Cap Capped No Cap Capped    
LW Mean 1.58 1.45 1.1 1.04 0.84 0.82 0.97 0.92 0.89 0.84 1.6 1.37 0.8 0.66    
Median 0.59 0.59 0.53 0.53 0.48 0.48 0.46 0.46 0.4 0.4 0.56 0.56 0.1 0.1    
Mode 0.02 15 0.02 0.02 0.02 0.02 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01    
Standard Deviation 3.75 2.53 2.65 1.67 1.64 1.34 2.43 1.62 2.21 1.48 4.71 2.5 3.57 1.77    
CoV-Weighted 2.37 1.74 2.42 1.61 1.97 1.64 2.51 1.77 2.49 1.76 2.94 1.82 4.47 2.7    
Sample Variance 14.08 6.38 7.03 2.8 2.7 1.79 5.89 2.63 4.9 2.2 22.22 6.23 12.75 3.13    
Minimum 0 0 0 0 0 0 0 0 0 0 0 0 0 0    
Maximum 111.7 15 80.1 15 41.83 15 97.36 15 57.72 15 99.15 15 78.89 15    
Count 3,897 3,897 3,449 3,449 3,112 3,112 4,598 4,598 2,815 2,815 4,033 4,033 1,356 1,356    
                                 
Capping Value:   15   15   15   15   15   15   15    
Urucum Central
  Lode 1   Lode 2   Lode 3   Lode 6   Lode 7   Lode 8   Lode 11   Lode 12  
Item No Cap Capped No Cap Capped No Cap Capped No Cap Capped No Cap Capped No Cap Capped No Cap Capped No Cap Capped
LW Mean 1.39 1.36 1.84 1.71 0.73 0.72 1.69 1.64 1.88 1.77 0.6 0.6 2.93 2.93 0.76 0.76
Median 0.61 0.61 0.66 0.66 0.28 0.28 0.78 0.78 0.59 0.59 0.27 0.27 0.96 0.96 0.48 0.48
Mode 0.14 0.14 0.01 20 0.25 0.25 0.02 0.02 0.16 20 0.5 0.5 #N/A #N/A 0.07 0.07
Standard Deviation 2.77 2.33 4.38 3.06 2.06 2.02 3.25 2.85 4.17 3.57 0.94 0.94 3.62 3.62 1.2 1.2
CoV-Weighted 1.99 1.72 2.38 1.79 2.83 2.8 1.92 1.74 2.22 2.02 1.58 1.58 1.23 1.23 1.58 1.58
Sample Variance 7.66 5.42 19.17 9.38 4.23 4.1 10.54 8.11 17.43 12.75 0.89 0.89 13.12 13.12 1.45 1.45
Minimum 0 0 0 0 0 0 0 0 0.01 0.01 0.01 0.01 0.06 0.06 0.01 0.01
Maximum 81.3 20 146.32 20 20.44 20 31.92 20 28.91 20 4.95 4.95 13.18 13.18 18.28 18.28
Count 9,909 9,909 11,234 11,234 126 126 1,102 1,102 489 489 102 102 32 32 712 712
                                 
Capping Value:   20   20   20   20   20   20   20   20

 

Urucum Central    
  Lode 13   Lode 14   Lode 15   Lode 18   Lode 19   Lode 20   Lode 21      
Item No Cap Capped No Cap Capped No Cap Capped No Cap Capped No Cap Capped No Cap Capped No Cap Capped    
LW Mean 0.59 0.59 0.53 0.53 1.1 1.1 1.04 1.04 1.19 1.03 1.97 1.94 0.48 0.48    
Median 0.5 0.5 0.16 0.16 0.81 0.81 0.48 0.48 0.58 0.58 0.82 0.82 0.28 0.28    
Mode 0.67 0.67 0.03 0.03 2.59 2.59 0.08 0.08 0.17 0.17 0.01 20 0.09 0.09    
Standard Deviation 0.59 0.59 0.84 0.84 1.03 1.03 1.76 1.76 3.57 1.94 3.22 2.94 0.7 0.7    

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-16
 www.rpacan.com

 

 

Urucum Central    
  Lode 13   Lode 14   Lode 15   Lode 18   Lode 19   Lode 20   Lode 21      
Item No Cap Capped No Cap Capped No Cap Capped No Cap Capped No Cap Capped No Cap Capped No Cap Capped    
CoV-Weighted 1 1 1.58 1.58 0.94 0.94 1.7 1.7 3.01 1.88 1.64 1.52 1.45 1.45    
Sample Variance 0.34 0.34 0.7 0.7 1.06 1.06 3.11 3.11 12.72 3.77 10.4 8.64 0.49 0.49    
Minimum 0.02 0.02 0.01 0.01 0.02 0.02 0 0 0 0 0 0 0 0    
Maximum 2.04 2.04 4.41 4.41 3.92 3.92 15.64 15.64 40.79 20 62.19 20 8.24 8.24    
Count 18 18 72 72 39 39 442 442 137 137 9,932 9,932 620 620    
                                 
Capping Value:   20   20   20   20   20   20   20    
Urucum South            
  Lode 31   Lode 32   Lode 33   Lode 34   Lode 36              
Item No Cap Capped No Cap Capped No Cap Capped No Cap Capped No Cap Capped            
LW Mean 2.67 2.55 1.47 1.2 1.12 1.12 1.31 1.29 1.07 1.07            
Median 1.43 1.43 0.56 0.56 0.6 0.6 0.78 0.78 0.85 0.85            
Mode 0.01 12 0.01 0.01 0.01 0.01 0.7 0.7 1.09 1.09            
Standard Deviation 3.39 2.92 3.93 1.97 1.51 1.51 1.82 1.69 0.9 0.9            
CoV-Weighted 1.27 1.15 2.68 1.64 1.35 1.35 1.39 1.31 0.84 0.84            
Sample Variance 11.48 8.55 15.42 3.88 2.29 2.29 3.3 2.85 0.81 0.81            
Minimum 0 0 0.01 0.01 0 0 0.01 0.01 0.04 0.04            
Maximum 26.43 12 47.58 12 11.45 11.45 16.25 12 6.67 6.67            
Count 1,398 1,398 334 334 692 692 241 241 133 133            
                                 
Capping Value:   12   12   12   12   12            
Urucum South            
  Lode 37   Lode 39   Lode 40   Lode 41   Lode 42              
Item No Cap Capped No Cap Capped No Cap Capped No Cap Capped No Cap Capped            
LW Mean 0.9 0.9 1.67 1.58 0.73 0.73 1.14 1.14 1.13 1.12            
Median 0.65 0.65 0.76 0.76 0.55 0.55 0.91 0.91 0.59 0.59            
Mode #N/A #N/A 0.01 0.01 0.02 0.02 0.94 0.94 0.03 0.03            
Standard Deviation 0.8 0.8 2.88 2.46 0.83 0.83 1.24 1.24 1.81 1.67            
CoV-Weighted 0.89 0.89 1.73 1.56 1.14 1.14 1.09 1.09 1.59 1.5            
Sample Variance 0.64 0.64 8.32 6.07 0.69 0.69 1.54 1.54 3.27 2.79            
Minimum 0.1 0.1 0.01 0.01 0.01 0.01 0.1 0.1 0 0            
Maximum 3.14 3.14 16.97 12 8.08 8.08 5.56 5.56 19.09 12            
Count 17 17 114 114 428 428 21 21 429 429            
                                 
Capping Value:   12   12   12   12   12            

 

  

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-17
 www.rpacan.com

 

 

Bulk Density

A large number of density measurements (39,991 measurements in total) are available for the various lithological and weathering units present at the Urucum deposit. A summary of the various measurement methods is provided in Section 10. For the purposes of this Mineral Resource estimate, each of these density measurements was assigned to one of the principal lithological units using the wireframe interpretations described above. Similarly, each of the density measurements were assigned to either oxidized or fresh rock as defined by the interpreted oxidized surface. All samples were then composited into equal one metre lengths and were used to interpolate the dry bulk density values into the block model for each respective lithological unit using the Inverse Distance (Power 2) (ID2) interpolation algorithm.

 

The summary descriptive statistics of the composited density measurements grouped by the interpreted lithology wireframes are presented in Table 14-6 and are graphically illustrated in Figures 14-9 and 14-10. Comparison of the density values for the oxidized and fresh rock show that, as expected, the degree of variation in the density values for each of the fresh rock lithologies reside within much narrower ranges as compared to their oxidized equivalents.

 


Table 14-6   Descriptive Statistics of the Composited Density Measurements By Rock Type - Urucum Deposit
Great Panther Mining Limited - Tucano Gold Mine

 

Item BIF (2000) Carbonate
(3000)
East Schist
(4000)
Pegmatite
(5000)
West Schist
(6000)
Primary
Mean 3.30 3.12 2.80 2.75 * included
Median 3.32 3.10 2.76 2.66 with
Mode 3.33 3.00 2.67 2.94 East
Standard Deviation 0.25 0.24 0.19 0.24 Schist
Sample Variance 0.06 0.06 0.03 0.06 composites
Minimum 2.32 1.12 2.04 1.78  
Maximum 4.88 4.66 4.12 4.35  
Count 12,011 12,754 10,105 3,971  
Oxide
Mean 2.41 2.17 2.05 2.53 * included
Median 2.40 2.07 1.89 2.58 with
Mode 1.75 1.67 2.00 2.64 East
Standard Deviation 0.67 0.67 0.44 0.44 Schist
Sample Variance 0.45 0.45 0.19 0.19 composites
Minimum 1.06 0.82 1.33 1.40  
Maximum 3.61 3.44 3.17 4.16  
Count 173 148 161 64  

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-18
 www.rpacan.com

 

 

Figure 14-9 Distribution of Composited Density Measurements by Rock Type, Oxidized Zone - Urucum Deposit

 

 

 

Figure 14-10 Distribution of Composited Density Measurements by Rock Type, Fresh Rock - Urucum Deposit

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-19
 www.rpacan.com

 

 

Trend Analysis

Grade Contouring:

As an aid in carrying out variography studies to understand the continuity of the gold grades in the various mineralized wireframes, RPA prepared a series of traditional longitudinal projections for a selection of the mineralized wireframes present at the Urucum deposit. For this exercise, a data file was prepared that contained the average (uncapped) gold grade across the entire width of the mineralized wireframe model for each drill hole (and channel sample) that pierced the wireframe model. The resulting average grades of the collection of pierce points for any given wireframe model were then contoured using the contouring function of the GEOVIA Surpac (v. 2019, r1) software modelling package. The results of this contouring exercise are presented in Figures 14-11 through 14-14, inclusive.

 

Review of the resulting contoured grade longitudinal sections for the selected lodes at the Urucum deposit suggests that, in general, the higher gold grades are situated as small pockets that are perhaps a few tens of metres in size. In places, these higher grade pockets are contained within broader, lower grade zones which exhibit shallow northerly plunges in places. Flat-lying plunges, and steep southerly plunges are also suggested on a more local scale.

 

A detailed review of the contoured gold grades for Lode 20 show the presence of sustained higher gold grades along a strike length of approximately 100 m to 150 m below the current mining surface. This observation is made on the basis of drill hole information at a spacing of approximately 50 m. Review of the detailed-scale grade distribution from the closely spaced grade control holes suggests the presence of moderately north dipping plunges for these higher grades.

 

The down-plunge limits of many of the higher grade mineralized shoots at Urucum do not appear to be defined by drilling in the wireframes examined. Additional drill testing is warranted.

 

RPA recommends that contouring exercises be continued for the remainder of the mineralized wireframes present at the Urucum deposit as aids in conducting future variogram analyses as well as aids for developing exploration targets. These contouring exercises should examine not only the distribution of the gold grades alone, but also examine the grade times thickness product.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-20
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-21
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-22
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-23
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-24
 www.rpacan.com

 

Variography:

Variography studies were carried out by the Mine staff wherein the spatial continuity of the capped, composited gold grades was examined on a grouped basis for the samples contained within the mineralized wireframes for the Urucum South, Urucum Central, and Urucum North lodes. Sample correlograms are presented in Figures 14-15. A summary of the correlogram parameters derived for the Urucum lodes is presented in Table 14-7.

 

Figure 14-15 Sample Correlograms - Urucum Central Lodes

 

 

 


Table 14-7   Summary of Correlogram Parameters - Urucum Central Lodes
Great Panther Mining Limited - Tucano Gold Mine

 

Item S1 S2 S3
Urucum South (Nugget (C0) = 0.35)
Type Spherical Spherical Spherical
Sill 0.30 0.15 0.25
Range (m), Major (N5W/15) 10 50 350
Range (m), Intermediate (N85E/70) 10 90 90
Range (m), Minor (S85W/20) 14 14 14

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-25
 www.rpacan.com

 

 

Item S1 S2 S3
Urucum Central (Nugget (C0) = 0.45)
Type Spherical Spherical Spherical
Sill 0.40 0.05 0.10
Range (m), Major (N10W/15) 20 60 200
Range (m), Intermediate (N80E/70) 10 90 90
Range (m), Minor (S80W/20) 7 24 24
Urucum North (Nugget (C0) = 0.65)
Type Spherical Spherical Spherical
Sill 0.20 0.10 0.05
Range (m), Major (N10W/15) 10 40 200
Range (m), Intermediate (N80E/70) 20 30 90
Range (m), Minor (S80W/20) 8 15 15
             

 

Block Model Construction

An upright, non-rotated block model was created by Mine staff using the Datamine Studio 3 software packages with the long axis of the blocks being oriented along the strike of the mineralized wireframe models (i.e., to the north). The selected block sizes were five metres in the north-south direction (along strike) by three metres in the east-west direction (across strike), and four metres in height. The block sizes were selected so as to match with the block sizes used for the short term grade control program and daily production planning.

 

The block model used a whole-block approach for coding the wireframes found at the Urucum South and Urucum Central zones, but then used a partial-percentage approach for the mineralized wireframes found at the Urucum North zone. A number of attributes were also created to store such information as gold grades, distances to and the number of informing samples, domain codes, resource classification codes, and the like. The block model origins, dimensions, and attributes are provided in Table 14-8, and a list of the attributes used is provided in Table 14-9.

 


Table 14-8   Summary of Block Model Origin and Extents - Urucum Deposit
Great Panther Mining Limited - Tucano Gold Mine

 

Type Y (North) X (East) Z (Elev.)
Minimum Coordinates 97,800 401,500 -700
Maximum Coordinates 100,370 402,400 260
User Block Size 5 3 4
Rotation 0.000 0.000 0.000

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-26
 www.rpacan.com

 

 


Table 14-9   Summary of Block Model Attributes - Urucum Deposit
Great Panther Mining Limited - Tucano Gold Mine

 

Attribute Name Type Decimals

Background

Value

Description
aulp Real 0 -1e+30 Final gold grade
box Real 0 1 Code for deposit ID
class Real 0 0 Mineral Resource classification
code Real 0 0 Lode ID
densi Real 0 -1e+30 Interpolated density
lito Real 0 0 Lithology code
ore Real 0 1 Wireframe flag
ore% Real 0 0 Partial percentage for wireframe flag
oxi Real 0 0 Oxidation state

 

RPA recommends that future updates to the Urucum long term Mineral Resource block models use common origins with the short term grade control block models.

 

Search Strategy and Grade Interpolation Parameters

The search strategies used to estimate the gold grades into the block model are summarized in Table 14-10. The orientation and anisotropy ratios for the search strategies were slightly modified from those suggested from the variography study. Gold grades were estimated for each mineralized wireframe individually using the Nearest Neighbour (NN), Ordinary Kriging (OK), (ID2), and Inverse Distance (Power 3) (ID3) interpolation algorithms using the Datamine Studio 3 software package.

 

A multiple-pass estimation strategy was applied using “hard” domain boundaries for both selection of composite samples for grade estimation as well as “hard” block model boundaries to control which blocks receive estimated gold grades. Only data contained within the respective mineralized wireframes were used to estimate the gold grades, and only those blocks within the respective mineralized wireframes were allowed to receive grade estimates. Only the capped, composited grades were used to estimate the grades.

 

The gold grades estimated using the OK interpolation algorithm were selected for preparation of the Mineral Resource estimate. The gold grades estimated by OK for any blocks lying within the pegmatite unit were reduced to zero. These were then transferred to the Au_LP attribute which was then used for reporting of the Mineral Resources.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-27
 www.rpacan.com

 

 


Table 14-10   Summary of Search Strategy and Interpolation Parameters - Urucum Deposit
Great Panther Mining Limited - Tucano Gold Mine

 

Item Urucum South Urucum Central Urucum North
Boundary conditions- data Hard Hard Hard
Boundary conditions- blocks Hard Hard Hard
Search ellipse orientation

Azimuth 355°, dip 70°E, Plunge 15°N

 

Azimuth 350°, dip 70°E, Plunge 15°N Azimuth 350°, dip 70°E, Plunge 15°N
Estimation Pass1 Search Radius 50x40x8; Maximum 4 samples per hole; Minimum 9 samples (Means Minimum 3 drill holes); Maximum 32 Samples; Four Sectors (Quadrant) Search Radius 30x40x6; Maximum 4 samples per hole; Minimum 9 samples (Means Minimum 3 drill holes); Maximum 32 Samples; Four Sectors (Quadrant)

Search Radius 50x40x8; Maximum 4 samples per hole; Minimum 9 samples (Means Minimum 3 drill holes); Maximum 32 Samples; Four Sectors (Quadrant)

 

Estimation Pass2

Search Radius 90x80x12; Maximum 4 samples per hole; Minimum 5 samples (Means Minimum 2 drill holes); Maximum 32 Samples; Four Sectors (Quadrant)

 

Search Radius 60x60x12; Maximum 4 samples per hole; Minimum 5 samples (Means Minimum 2 drill holes); Maximum 32 Samples; Four Sectors (Quadrant) Search Radius 90x80x12; Maximum 4 samples per hole; Minimum 5 samples (Means Minimum 2 drill holes); Maximum 32 Samples; Four Sectors (Quadrant)
Estimation Pass3 Populate remaining blocks - Search Radius 1500x1500x100 Populate remaining blocks - Search Radius 1500x1500x100 Populate remaining blocks - Search Radius 1500x1500x100

 

For mine planning purposes, gold grades were also estimated for those volumes for which drill hole and sample information were available and that resided beyond the limits of the mineralized wireframes. The grades for these areas were estimated using composites of the capped gold grades, an isotropic search ellipse, and using the ID3 interpolation algorithm. For clarity, these gold grades were estimated for mine planning purposes only and were not considered in any estimates of the Mineral Resources.

 

Classification Criteria

Definitions for resource categories used in this Technical Report are consistent with those defined by CIM (2014) and adopted by NI 43-101. The estimated blocks within the mineralized wireframes were assigned an initial classification according to the criteria presented in Table 14-11. These initial classifications were then modified via a post-processing function which used a moving average radius of 15 m x 25 m x 1,000 m to arrive at a final, smoothed classification.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-28
 www.rpacan.com

 

 


Table 14-11   Summary of Initial Classification Criteria - Urucum Deposit
Great Panther Mining Limited - Tucano Gold Mine

 

Item Measured Indicated Inferred
Urucum South  
Pass No., and 1 2 3
Slope of Regression 0.9 None None
Urucum Central  
Pass No., and 1 2 3
Slope of Regression 0.9 0.1 None
Urucum North  
Pass No., and 1 2 3
Minimum number of neighbours 13 None None
         

 

Block Model Validation

Validation of the results of the long term Mineral Resource block model included visual comparisons, evaluation of the accuracy of the block model coding and global accuracy of the estimated grades, evaluation of the local accuracy by preparation of swath plots, and reconciliation with the short term grade control block model.

 

Visual Comparisons:

Visual comparisons between the contoured and estimated gold grades were conducted for selected mineralized wireframes of the various lodes at the Urucum deposit (Figures 14-16 to 14-19, inclusive). It can be seen that, while a general agreement is present between the distribution of the estimated gold grades and the contoured drill hole grades for those portions within the Mineral Resource pit surface, differences are present at the local scale. These differences will contribute to increased variances when reconciliation studies are performed between the long term Mineral Resource model and the short term grade control model. RPA believes that the choice of input parameters for the search strategies are contributing to the “smoothing” effect observed in the estimated gold grades. Additional drill hole information will be of great assistance in reducing the variances between the long term Mineral Resource model and the short term grade control model.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-29
 www.rpacan.com

 

 

RPA recommends that future long term block models for the Urucum deposit be prepared using more stringent search strategies that are designed to improve the accuracy of the estimated grades at the local level.

 

Global Estimate:

The accuracy of the global estimate of the gold grades was examined by comparison of the average gold grades for each mineralized wireframe with the corresponding capped composite grades (Table 14-12). A cross check of the volumes of each of the mineralized wireframes with those coded in the block model was also completed.

 

Examination of the differences between the wireframe volumes and the block model codes shows that the block volumes are in reasonable agreement with the mineralized wireframes. Higher variances are observed for the Urucum North zone, which are believed to be due to the selected method of partial percentage and the accompanying workflow for coding of the block model.

 

RPA recommends that future updates to the Urucum long term Mineral Resource block models be carried out using a sub-blocked block model framework so that the volumes and grades of the mineralized wireframed can be easily modelled with a high degree of accuracy.

 

Examination of the differences in grade shows that while significant variances are present on an individual wireframe basis, overall the estimated grades are in good agreement with the informing samples. RPA believes that the “smoothing” effect discussed above is a contributing factor to the observed variances.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-30
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-31
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-32
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-33
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-34
 www.rpacan.com

 


Table 14-12   Comparison of Composite Average Grades with Block Estimates - Urucum Deposit
Great Panther Mining Limited - Tucano Gold Mine

 

  Block Model Report Wireframes Composites
Lode ID

Volume

(m3)

Tonnes Grade (g/t Au) Volume Difference (BM-Wf) % difference

Average Grade

(g/t Au)

Difference (BM-Comp) % Difference
Urucum Central (Whole Blocks)
1 1,277,880 3,918,371 1.20 1,282,643 - 4,763 0% 1.36 -0.19 -12%
2 1,485,840 4,608,614 1.52 1,496,733 - 10,893 -1% 1.7 -0.19 -11%
3 6,480 16,334 0.66 6,649 - 169 -3% 0.72 -0.06 -9%
6 71,460 174,163 1.09 74,416 - 2,956 -4% 1.64 -0.56 -34%
7 54,420 161,462 1.53 55,174 - 754 -1% 1.77 -0.24 -14%
8 9,060 27,174 0.71 9,887 - 827 -8% 0.6 0.11 19%
11 10,800 33,727 2.96 11,210 - 410 -4% 2.93 0.03 1%
12 42,720 119,782 0.58 43,550 - 830 -2% 0.76 -0.18 -23%
13 38,340 123,192 0.56 39,560 - 1,220 -3% 0.59 -0.04 -6%
14 4,980 16,130 0.43 5,479 - 499 -9% 0.53 -0.10 -19%
15 3,300 11,332 1.16 3,262 38 1% 1.1 0.06 6%
18 21,240 67,413 0.94 21,980 - 740 -3% 1.04 -0.10 -10%
19 4,800 13,393 0.92 4,921 - 121 -2% 1.03 -0.11 -10%
20 809,640 2,520,053 2.19 817,221 - 7,581 -1% 1.94 0.25 13%
21 42,960 120,973 0.40 43,182 - 222 -1% 0.48 -0.08 -16%
Urucum North (Partial Percentage)
22 1,721,439 5,434,661 1.15 1,895,220 - 173,781 -9% 1.45 -0.30 -21%
23 929,747 2,927,112 0.90 1,016,440 - 86,693 -9% 1.04 -0.14 -13%
24 935,843 2,817,236 0.67 1,130,870 - 195,027 -17% 0.82 -0.16 -19%
25 2,415,520 7,576,337 1.38 2,539,389 - 123,869 -5% 0.92 0.46 50%
27 863,407 2,610,695 0.73 874,652 - 11,245 -1% 0.84 -0.11 -13%
28 2,153,458 6,707,663 1.57 2,241,193 - 87,735 -4% 1.37 0.20 15%
29 1,372,348 4,078,599 0.69 1,378,925 - 6 ,577 0% 0.66 0.03 4%
Urucum South (Whole Blocks)
31 377,700 1,201,680 1.36 380,119 - 2,419 -1% 2.55 -1.20 -47%
32 115,920 369,916 1.07 114,466 1,454 1% 1.2 -0.14 -11%
33 91,140 238,337 0.68 92,126 - 986 -1% 1.12 -0.44 -39%
34 53,520 173,936 0.95 54,321 - 801 -1% 1.29 -0.34 -26%
36 22,020 47,923 1.06 19,896 2,124 11% 1.07 -0.01 -1%
37 4,440 9,023 0.91 4,451 - 11 0% 0.9 0.01 1%
39 27,060 87,994 1.40 27,034 26 0% 1.58 -0.18 -12%
40 34,920 79,381 0.63 34,396 524 2% 0.73 -0.10 -14%
41 6,000 19,130 0.88 5,812 188 3% 1.1 -0.22 -20%
42 82,320 255,747 0.70 81,472 848 1% 1.12 -0.42 -38%
Total 15,090,722 46,567,480 1.23 15,806,649 - 715,927 -5% 1.24 -0.01 -1%

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-35
 www.rpacan.com

 

 

Swath Plots:

Swath plots in section and plan (i.e., bench) views were prepared for selected lodes in which the average capped, composited assays were compared with the average of the estimated block grades (Figures 14-20 to 14-23, inclusive). Examination of these plots suggests that good agreement is present between the estimated grades and the informing samples for those portions of the block model containing a high density of drilling and sampling information. Higher variances are observed in areas where the density of sample information is reduced. A degree of smoothing is also observed.

 

Reconciliation to Short Term Grade Control Block Model:

Attempts were made to compare the results of the long term Mineral Resource model with the data contained within the short term grade control model for the Urucum deposit. Unfortunately, these efforts were not successful in generating meaningful reports due to variances in the workflows and estimation parameters used to prepare the two different block models.

 

RPA recommends that efforts be undertaken to ensure that the estimation parameters and workflows be harmonized between the long term Mineral Resource block model and the short term grade control block model for the Urucum deposit.

 

Conclusion:

On the basis of its review and validation activities, RPA is of the opinion that the long term Mineral Resource block model for the Urucum deposit is sufficiently acceptable for use in preparing Mineral Resource estimates.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-36
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-37
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-38
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-39
 www.rpacan.com

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-40
 www.rpacan.com

 

 

Cut-off Grade and Whittle Parameters

Metal prices used for Mineral Reserves are based on consensus, long term forecasts from banks, financial institutions, and other sources. For Mineral Resources, metal prices used are slightly higher than those for Mineral Reserves.

 

A preliminary pit shell was generated using the Lerchs-Grossman optimization method as a constraint in the preparation of the Mineral Resource estimate report. The input parameters are presented in Table 14-13.

 

The sensitivity of the resulting pit shell to variations in the gold price was also investigated for the US$1,600/oz Au and US$1,700/oz Au cases (Table 14-14). It is important to note that the tonnage and grades presented in the sensitivity reports are provided solely for the purposes of estimating the impact of different metal prices. These tonnages and grades are provided on an unclassified basis only and are not to be construed as estimates of the Mineral Resources.

 


Table 14-13   Summary of Mineral Resource Pit Shell Input Parameters - Urucum Deposit
Great Panther Mining Limited - Tucano Gold Mine

 

Parameter Value
Gold Price (Base Case) US$1,500/oz Au
Exchange Rate US$1:R$3.8

Mining Cost

- oxide

- fresh rock

 

$3.23 /tonne

$3.58 /tonne

Processing Cost

- oxide

- fresh rock

 

$11.93 /tonne

$18.33 /tonne

General and Administration Cost $6.15 /tonne
Gold Recovery 93%

Pit Discard Cut-off Grade

- oxide

- fresh rock

 

0.40 g/t Au

0.55 g/t Au

Overall wall slope angle

- oxide

- fresh

34° - 42°

48° - 53°

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-41
 www.rpacan.com

 

 


Table 14-14   Sensitivity Analysis - Urucum Deposit
Great Panther Mining Limited - Tucano Gold Mine

 

Gold Price

(US$/oz Au)

Tonnage

(000)

Grade

(g/t Au)

Contained Metal

(000 oz Au)

1,500 4,376 2.08 293
1,600 4,676 2.04 307
1,700 5,070 2.02 329

 

Mineral Resource Statement

The Mineral Resources are inclusive of Mineral Reserves. The Mineral Resources are reported for the open pit component of the Urucum deposit using excavation surfaces current as of September 30, 2019. A block cut-off grade of 0.55 g/t Au was used to report the fresh rock Mineral Resources and a block cut-off grade of 0.40 g/t Au was used to report the oxide Mineral Resources (Table 14-15).

 


Table 14-15   Summary of the Open Pit Mineral Resources as of September 30, 2019 - Urucum Deposit
Great Panther Mining Limited - Tucano Gold Mine

 

Category

Tonnage

(000)

Grade

(g/t Au)

Contained Metal

(000 oz Au)

Measured 1,775 1.76 100
Indicated 2,589 2.30 191
Sub-total, Measured and Indicated 4,364 2.08 291
       
Inferred 7 3.94 1

 

Notes:

1.CIM (2014) definitions were followed for Mineral Resources.
2.Mineral Resources for the Urucum Open Pit are estimated using drill hole and sample data as of September 30, 2019.
3.Mineral Resources are estimated at a cut-off grade of 0.40 g/t Au for oxidized material and 0.55 g/t Au for fresh rock.
4.Mineral Resources are estimated using a long term gold price of US$1,500/oz Au and a US$/R$ exchange rate of 1:3.8.
5.A minimum width of 3 m was used for preparation of mineralization wireframes.
6.High gold assays were capped to 12 g/t Au for the Urucum South deposit and 20 g/t Au for the Urucum Central deposit, and 15 g/t Au for the Urucum North deposit.
7.Gold grades estimated using the Ordinary Kriging interpolation algorithm were used to prepare the Mineral Resource statements.
8.Mineral Resource statements are prepared using constraining surfaces for open pit Mineral Resources.
9.Mineral Resources, that are not Mineral Reserves do not have demonstrated economic viability.
10.Numbers may not add due to rounding.

 

Tucano is a currently operating, fully permitted mining and processing operation. Consequently, RPA is not aware of any environmental, permitting, legal, title, taxation, socio-economic, marketing, political, or other relevant factors that could materially affect the Mineral Resource estimate. Changes in the commodity prices, operating costs, or metallurgical recoveries could have commensurate impacts upon the Mineral Resource estimates.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-42
 www.rpacan.com

 

 

Underground General Statement

The underground portion of the Urucum model was subdivided into Urucum North (URN) and Urucum Central, with a geographic divisor at 99,400 mN. The Urucum underground resource covers a strike length of approximately 800 m. The lodes form continuous subparallel, steeply dipping, shallow plunging high grade shoots hosted within BIF. The geometry and plunge of the shoots are interpreted to be controlled by gently plunging F2 fold hinges and steeply dipping fault intersections.

 

RPA reviewed the Urucum North underground model that included data current to November 2, 2015 and was reported in the 2018 Technical Report prepared for Great Panther by AMC Consultants Pty Ltd. (AMC). RPA reported resources in the underground portion of the Urucum Central deposit from the model described above in the open pit section, using drill hole and sample data as of September 30, 2019.

 

Urucum North Underground

RPA reviewed the parameters, workflows, and results used to prepare the block model used to report the 2017 underground Mineral Resources at Urucum North underground which was estimated by AMC and included data current to November 2, 2015. Overall, these were judged to be adequate for preparing updated statements of the updated Mineral Resource. Drilling completed since the previous Technical Report was reviewed and, in RPA’s opinion, does not materially impact the Mineral Resource estimate.

 

RPA made several modifications to the resource estimate, including the use of a constraining surface resource pit shell to report open pit resources. Underground resources are reported below the pit surface at a higher cut-off grade. In order to ensure that the underground component has sufficient spatial continuity, RPA constructed underground shapes that were based on a cut-off grade of 1.60 g/t Au and reported all blocks within these shapes as underground Mineral Resources.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-43
 www.rpacan.com

 

 

Topograhy and Excavation Models

A digital copy of the as-mined topographic surface was provided to RPA for the Urucum deposit that was current as of September 30, 2019 (Figure 14-1). The cut-off date for the drill hole database is September 30, 2019.

 

Mineral Resource Database

The drill hole database includes 5,674 holes with assays from auger, channel, trench, diamond, RAB, and RC holes. Table 14-16 summarizes the subset of 5,227 holes that intersect the mineralized domains at Urucum North, and Table 14-17 summarizes only those drill holes that intersect the mineralized domains in the underground portion of the deposit.

 

Table 14-16   Summary of the Mineral Resource Database - Urucum North Deposit
Great Panther Mining Limited - Tucano Gold Mine

 

Drill Hole Type Count Metres
DDH 133 45,088
RC 30 2,716
Channel 7 102
RAB 84 688
Auger 7 43
Total 261 48,637

 

Table 14-17   Summary of the Underground Portion of the Mineral Resource Database - Urucum North Deposit
Great Panther Mining Limited - Tucano Gold Mine

 

Drill Hole Type Count Metres
DDH 114 43,083
RC 11 1,207
Channel 2 71
RAB - -
Auger 2 13
Total 129 44,374

 

RPA conducted several checks on the resource database, including a search for unique, missing, and overlapping intervals; a total depth comparison, duplicate holes, property boundary limits, and a visual search for extreme or deviant survey values.

 

The resource database is considered by RPA to be sufficiently reliable for grade modelling and Mineral Resource estimation.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-44
 www.rpacan.com

 

 

Lithology Model

The lithology model is shown in Figure 14-2 and is described in the open pit section of the Urucum deposit.

 

Mineralization Models

Twenty-four mineralized lodes at Urucum North were constructed using a 0.3 g/t Au nominal cut-off, and typically extended 20 m between sections and up to 40 m beyond the last drill hole intersection. No minimum thickness was used for modelling, and lodes may be less than one metre in thickness at depth.

 

RPA recommends that a minimum mining thickness be used when modelling mineralized domains and that wireframes be snapped to assays.

 

Exploratory Data Analysis

AMC calculated statistics for raw assay data by lode domain. RPA reviewed the assay statistics and concludes that it accurately summarizes the data.

 

Compositing

AMC created one metre downhole composites inside the mineralized domains beginning at the upper contacts and flagged by domain code. If the remaining length was greater than or equal to 0.50 m, the composite was accepted as part of the dataset; if the remaining length as less than 0.50 m, the composite was not included. A total of 3,440 composites were created within the mineralized domains and used for resource estimation.

 

In RPA’s opinion, a composite length of one metre is appropriate at Urucum North. RPA conducted a check on assays and composites within the Urucum North wireframe models and the results were reasonably consistent with data included in the previous Technical Report.

 

Capping High Grade Values

AMC opted to cap high grade assay data after compositing. Each mineralized domain was reviewed for outliers using logarithmic histograms and probability plots. Grade capping was established within the 98th and 100th percentile of the grade distribution curve, and in domains with fewer than 100 composite samples, no grade capping was applied. In domains with uncapped composites, AMC controlled the influence of high grade samples by applying more restrictive ranges during grade interpolations as described below.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-45
 www.rpacan.com

 

 

RPA reviewed the statistical distribution of the original assay and composite data by plotting histograms and log scale probability plots. In RPA’s opinion, the capping values used by AMC on composite samples is acceptable. RPA recommends, however, that capping values be applied to assays prior to compositing.

 

Bulk Density

Bulk density measurements were assigned to a lithological unit and interpolated into the block model using the NN method. A total of 19,754 samples, most within fresh rock, were available.

 

In RPA’s opinion, the average bulk density values of the lithological units at Urucum North appear reasonable.

 

Variography and Interpolation Parameters

AMC grouped all the resource domains together to review the spatial variability at Urucum North: most lodes have too few samples to generate a robust model. Semi-variograms were developed using the one metre capped composite Au samples. The variogram is aligned with the strike and dip of the lodes with ranges of 130 m (major) by 120 m (semi-major) by 25 m (minor).

 

Gold grades were estimated in three consecutive OK passes using the parent cells, hard boundaries, and one metre capped composites. The radius for the first and second pass is based on the variogram ranges and the search ellipsoid was oriented in the same direction as the variogram. A larger search was used for the third pass to fill all empty blocks. Interpolation and search parameters used by AMC are summarized in Table 14-18.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-46
 www.rpacan.com

 

 

Table 14-18   Summary of Search Parameters - Urucum North Deposit
Great Panther Mining Limited - Tucano Gold Mine

 

Parameter Pass 1 Pass 2 Pass 3
No. Composites (min/max) 12/32 12/32 4/32
Search type Octant Octant -
Optimal Samples per Octants 3 3 -
Min. drill holes 3 2 1
Search radius (% of variogram) 100% 100% -
Search radius X (m) 130 130 *
Search radius Y (m) 120 120 *
Search radius Z (m) 25 25 *

 

Note.* Large enough to estimate all blocks

 

AMC used a high grade restriction of 20 m to limit the influence of high grade samples at a defined cut-off grade.

 

Block Model Construction

AMC constructed the Urucum North underground block model in the National Grid system (UTM SAD69 Zone 22N) using Surpac software. The estimation was completed in Isatis and imported into the sub-blocked Surpac model. Table 14-19 summarizes the block model parameters at Urucum North.

 

Table 14-19   Block Model PArameters - Urucum North Deposit
Great Panther Mining Limited - Tucano Gold Mine

 

  Easting (X) Northing (Y) Elevation (Z)
Minimum (m) 401,500 97,940 -683
Maximum (m) 402,316 100,440 317
Extents (m) 816 2,500 1,000
Block size (m) 8.0 20.0 20.0
Sub block size (m) 1.0 5.0 2.5
Rotation (° around axis)

 

Given the narrowness of the mineralized domains, RPA recommends using a smaller block size at Urucum North underground.

 

Classification

Resources were classified based on the confidence in geological knowledge, and interpretation, drilling density and orientation, variogram model attributes, including the range of the first structure, and estimation statistics such as slope of regression. AMC visually inspected the classification results and manually re-classified blocks where appropriate.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-47
 www.rpacan.com

 

 

RPA reviewed the classified block model within the open pit shell. RPA re-assigned the blocks previously classified as Measured to Indicated. In RPA’s opinion, the final classified block model is reasonable for this level of study. RPA recommends that the local block classification be adjusted where isolated islands of Inferred blocks occur within large areas of Indicated Mineral Resources.

 

Block Model Validation

RPA carried out several block model validation procedures including:

Visual comparisons of block gold values versus composite values, and block density values versus sample point values.
Statistical comparisons.
Comparison of the volumes of the wireframe models to the block model volume results.
Trend plots of block gold values by elevation, northing, and easting.
Comparison of block and composite grades in blocks containing composites.

 

Block grades were visually examined and compared with composite grades in cross section and on elevation plans. RPA found grade continuity to be reasonable and confirmed that block grades were reasonably consistent with local drill hole assay and composite grades and that there was no significant bias apparent.

 

To check for conditional bias, trend plots were created which compared the gold block model estimates with the composite and sample average grades below the preliminary Whittle pit shell. In RPA’s opinion, there is no significant bias between the resource block grades and the assay composites.

 

As a final check, RPA compared the volume of the mineralized domain models to the block model volume results. The volume difference is 5%, which RPA considers to be an acceptable result considering the block and sub-block dimensions relative to the mineralized domain widths (i.e., larger difference in domains with thickness that can taper to <1.0 m).

 

Validation by RPA indicates that the block model is a reasonable representation of the tonnages and grades of the mineralized zones at Urucum North underground.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-48
 www.rpacan.com

 

 

Mineral Resource Statement

The Mineral Resources are inclusive of Mineral Reserves. The Mineral Resources are reported for the underground component of the Urucum North deposit using excavation surfaces current as of September 30, 2019 and below the pit shell (see Open Pit section of the Urucum deposit above). To ensure continuity at the underground cut-off grade, RPA constructed underground shapes that were based on a cut-off grade of 1.60 g/t Au and reported all blocks within these volumes as underground Mineral Resources (Table 14-20).

 


Table 14-20   Summary of the Underground Mineral Resource Estimate as of September 30, 2019 - Urucum North Deposit
Great Panther Mining Limited - Tucano Gold Mine

 

Category Cut-off Grade (g/t Au)

Tonnage

(000)

Grade

(g/t Au)

Contained Metal

(000 oz Au)

Underground        
Fresh 1.60      
Indicated   3,042 4.04 395
Inferred   4,664 2.12 318

 

Notes:

1.CIM (2014) definitions were followed for Mineral Resources.
2.Mineral Resources are estimated at a cut-off grade of 1.60 g/t Au depending on envisioned mining methods and mineralization style.
3.Mineral Resources are estimated using a long term gold price of US$1,500/oz Au, and a US$/R$ exchange rate of 1:3.8.
4.Mineral Resources are inclusive of Mineral Reserves.
5.Mineral Resource statements are prepared using constraining surfaces for open pit Mineral Resources.
6.Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.
7.Numbers may not add due to rounding.

 

Tucano is a currently operating, fully permitted mining and processing operation. Consequently, RPA is not aware of any environmental, permitting, legal, title, taxation, socio-economic, marketing, political, or other relevant factors that could materially affect the Mineral Resource estimate. Changes in the commodity prices, operating costs, or metallurgical recoveries could have commensurate impacts upon the Mineral Resource estimates.

 

Urucum Central Underground

In addition to the tonnage and grades for the underground component of the Mineral Resources from Urucum North, the Mineral Resource statement for the underground component of the Urucum deposit includes additional mineralization in Lodes 1 and 20 of the Urucum Central zone. The Mineral Resources for this zone were estimated using the drilling and sampling information available as of September 30, 2019.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-49
 www.rpacan.com

 

 

Underground resources at Urucum Central are reported using a constraining surface resource pit and at a higher cut-off grade than resources within the pit shell.

 

Mineral Resource Statement

The Mineral Resources are inclusive of Mineral Reserves. The Mineral Resources are reported for the underground component of Urucum Central deposit using excavation surfaces current as of September 30, 2019 and below the pit shell (see Open Pit section of the Urucum deposit above). To ensure continuity at the underground cut-off grade, RPA constructed underground shapes that were based on a cut-off grade of 1.60 g/t Au and reported all blocks within these volumes as underground Mineral Resources (Table 14-21).

 


Table 14-21   Summary of the Underground Mineral Resource Estimate as of September 30, 2019 - Urucum Central Deposit
Great Panther Mining Limited - Tucano Gold Mine

 

Category Cut-off Grade (g/t Au)

Tonnage

(000)

Grade

(g/t Au)

Contained Metal

(000 oz Au)

Underground        
Fresh 1.60      
Inferred   852 2.61 71

 

Notes:

1.CIM (2014) definitions were followed for Mineral Resources.
2.Mineral Resources are estimated at various cut-off grades depending on envisioned mining methods and mineralization style.
3.Mineral Resources are estimated using a long term gold price of US$1,500/oz Au, and a US$/R$ exchange rate of 1:3.8.
4.Mineral Resources are inclusive of Mineral Reserves.
5.Mineral Resource statements are prepared using constraining surfaces and volumes.
6.Mineral Resources, which are not Mineral Reserves, do not have demonstrated economic viability.
7.Numbers may not add due to rounding.

 

Tucano is a currently operating, fully permitted mining and processing operation. Consequently, RPA is not aware of any environmental, permitting, legal, title, taxation, socio-economic, marketing, political, or other relevant factors that could materially affect the Mineral Resource estimate. Changes in the commodity prices, operating costs, or metallurgical recoveries could have commensurate impacts upon the Mineral Resource estimates.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-50
 www.rpacan.com

 

Tap AB Deposit

Open Pit

Topograhy and Excavation Models

Great Panther prepares digital models of the open pit mining excavations on a regular basis as mining progresses using information collected from drone surveys as well as conventional total station surveying equipment. The information collected from these periodic surveys are integrated together from the various mining areas at the Tap AB deposit into one integrated model of the as-mined topographic surface. A digital copy of the as-mined topographic surface was provided to RPA for the Tap AB open pit that was current as of April 19, 2019 (Figure 14-24).

 

Portions of the Tap AB open pits, principally in the southwest regions of the AB 3 deposit, have been backfilled during the course of mining operations. In order to correctly code the block models, a topographic surface of the “top of rock” was provided by the mine staff. This was used in conjunction with the current topography surface to correctly assign the material types and gold grades for these backfilled regions.

 

Topographic surveys of the stockpile areas that were active in 2019 were carried out using drone-mounted LIDAR surveying methods. The base of the stockpiles was taken from earlier topographic surfaces that were completed prior to the commencement of building these piles. The volumes of the stockpiles were reported from the resulting merged surfaces and the tonnage was estimated using truck counts.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-51
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-52
 www.rpacan.com

 

 

Mineral Resource Database

The presence and distribution of the gold mineralization found at the Tap AB deposit is defined by means of diamond drill holes, auger holes, and RC drill holes completed during deposit delineation drilling programs, and RC drill holes, chip/channel samples, RAB hole samples, and blast hole samples taken as part of the grade control sampling program. All information is entered into a master acQuire geological database management system which stores all drill hole and sample information for Tucano.

 

Subsets from this master database were extracted by Tucano staff and used for preparation of the Tap AB Mineral Resource estimate. All of the drill holes contained within the Tap AB subset of the database were used to prepare the estimate. All of the drill hole data were modified for use by the Leapfrog modelling software package. Additional fields to store such information as the composited assay values and wireframe flags were created as required during preparation of the Mineral Resource estimate.

 

The cut-off date for the drill hole database is September 30, 2019. The locations of the drill holes that were used to prepare the 2019 Mineral Resource estimate are shown in Section 10. The drilling has outlined gold mineralization along a strike length of approximately 2,100 m and from surface to depths of up to 350 m to 400 m from surface at the AB 3 deposit. A summary of the database is provided in Table 14-22.

 


Table 14-22   Summary of the Tap AB Drill Hole Database as of September 30, 2019
Great Panther Mining Limited - Tucano Gold Mine

 

Hole Type Number of Holes

Total Length

(m)

Auger (AG) 7,373 21,155
Chip/Channel (CH) 15,568 460,370
Diamond Drilling (DD) 763 107,604
Rotary Air Blast (RB) 15,887 88,448
Reverse Circulation (RC) 8,481 334,184
Trench Samples (TR) 1,991 55,183
Total 50,064 1,066,944

 

Lithology Model

Digital models of the main host rock types encountered at the Tap AB deposit were prepared by the Mine staff using a series of vertical, east-west cross sections that were equally spaced at 10 m intervals. The Hexagon MineSight software package was used to create the interpretations of the lithological and weathering units.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-53
 www.rpacan.com

 

 

The main rock types include BIF, a carbonate unit, amphibolite, quartz-sericite schist, and pegmatite (Figure 14-25). The BIF unit has been the host to the majority of the gold mineralization to date, although minor quantities of gold are also hosted by the carbonate unit as well as the East Schist unit. Excluding the pegmatite units, all rock units strike in a general north-south direction and have sub-vertical or steep easterly dips. The stratigraphy takes on a northeasterly strike in the area of the AB 1 deposit. Visual inspection of the pegmatite units by RPA during its visit to the Tucano site suggests that these units have not been subjected to the same degree of regional metamorphism and deformation, and so may represent a post-mineralization intrusion event.

 

A digital model of the nominal top of the fresh rock has been prepared using available information obtained from drill holes and mining activities. The depth of weathering in the Tap AB deposit varies greatly and weathering can achieve depths in the order of 250 m to 300 m (Figure 14-26). This weathering unit is topped off by the presence of a colluvium layer that represents weathered material that has been re-worked or transported by secondary processes such as erosion or mass flow events. The depth of this colluvium layer varies at the detailed scale but is generally in the order of 10 m.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-54
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-55
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-56
 www.rpacan.com

 

 

Mineralization Models

Gold mineralization at the Tap AB deposit is sub-divided generally into two principal areas referred to as the AB 1 and the AB 3 deposits. A third area of mineralization is located to the south of the AB 1 deposit and is referred to as the Torres area. Digital interpretations of the distribution of the gold mineralization for the Tap AB deposit were prepared by RPA using the Leapfrog software package. The mineralization wireframes were created using a nominal cut-off grade of 0.5 g/t Au across a minimum width of three metres to align with the cut-off grade and minimum width criteria that are currently being employed by the Mine staff for establishing the ore/waste dig packets at the Urucum deposit. It is important to note that the cut-off grade of 0.5 g/t Au represents a pit-discard cut-off grade, which considers processing and G&A costs only. Due to limited available time, RPA created the mineralized wireframe interpretations to a distance of five benches (approximately 20 m) above the current mining surface.

 

A total of 20 mineralized wireframes were created for the three mineralized areas (Table 14-23). Examples of the interpretations were presented in Section 10. In total, gold mineralization has been modelled along a strike length of approximately 2,100 m and to a depth of approximately 350 m to 400 m from surface.

 


Table 14-23   List of Mineralized Wireframes by Area - Tap AB Deposit
Great Panther Mining Limited - Tucano Gold Mine

 

Area Wireframe IDs
AB1 and Torres 1,2,4,5,6,7,8,9,10,11,12,14,15,16,17,18,19, and 20
AB 3 3,13, and 16

 

RPA recommends that a second series of wireframe interpretations be prepared for the Tap AB deposit using cut-off grade and minimum width criteria that are reflective of the envisioned operational scenario for an underground mining operation.

 

Exploratory Data Analysis and Grade Capping

Analyses of the gold grade distributions were conducted for those sample assays contained within each of the mineralized wireframes. These analyses included preparation of descriptive statistics along with examination of the grade distribution by means of upper tail histogram plots, decile analyses, and Parrish plots. The purpose of this exercise was to identify whether any outlier gold values are present whose influence on the Mineral Resource estimate must be restrained.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-57
 www.rpacan.com

 

 

Review of the results of these analyses suggests that an appropriate capping value is approximately 20 g/t Au for the AB1 and Torres mineralization and approximately 30 g/t Au for the AB 3 mineralization (Figures 14-27 and 14-28). A summary of the descriptive statistics for the capped and uncapped raw assays, along with a brief review of the impact of alternate capping values, is presented in Tables 14-24 and 14-25.

 

Figure 14-27 Upper Tail Histogram - AB 1 and Torres Areas

 

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-58
 www.rpacan.com

 

 

Figure 14-28 Upper Tail Histogram - AB 3 Area

 

 

 


Table 14-24   Descriptive Statistics of Uncapped Raw Assays - Tap AB Deposit
Great Panther Mining Limited - Tucano Gold Mine

 

Domain Count Min Max Mean Variance StDev CV Median
s01 5,461 0.00 104.00 1.80 19.65 4.43 2.47 0.59
s02 3,282 0.00 100.00 1.20 9.00 3.00 2.50 0.60
s03 6,185 0.00 1,084.43 3.26 372.70 19.31 5.92 0.47
s04 303 0.01 14.93 0.87 2.71 1.65 1.89 0.32
s05 345 0.00 21.34 1.67 7.45 2.73 1.64 0.76
s06 185 0.01 14.01 1.39 4.66 2.16 1.56 0.60
s07 1,202 0.00 124.10 1.63 25.97 5.10 3.13 0.70
s08 179 0.01 23.46 0.68 4.09 2.02 2.97 0.19
s09 447 0.00 10.74 1.21 1.85 1.36 1.12 0.71
s10 234 0.01 7.48 0.61 1.32 1.15 1.89 0.08
s11 230 0.01 83.70 2.27 56.00 7.48 3.29 0.67
s12 443 0.00 106.00 1.84 34.64 5.89 3.19 0.66
s13 1,056 0.00 38.63 0.75 3.43 1.85 2.47 0.35
s14 655 0.01 26.90 1.21 4.52 2.13 1.76 0.67
s15 836 0.00 95.78 2.49 44.39 6.66 2.68 0.87
s16 6,104 0.00 109.53 1.50 15.02 3.88 2.58 0.50
s17 98 0.00 139.86 4.81 281.30 16.77 3.49 0.70
s18 2,454 0.00 94.30 1.23 13.92 3.73 3.03 0.33
s19 42 0.02 33.46 3.23 34.13 5.84 1.81 1.03
s20 319 0.00 29.86 1.65 12.90 3.59 2.17 0.57

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-59
 www.rpacan.com

 

 


Table 14-25   Descriptive Statistics of Capped Raw Assays - Tap AB Deposit
Great Panther Mining Limited - Tucano Gold Mine

 

Domain Count Min Max Mean Variance StDev CV Median
s01 5,461 0.00 20.00 1.65 9.76 3.12 1.90 0.59
s02 3,282 0.00 20.00 1.15 4.18 2.05 1.79 0.60
s03 6,185 0.00 30.00 2.25 29.10 5.39 2.39 0.47
s04 303 0.01 14.93 0.87 2.71 1.65 1.89 0.32
s05 345 0.00 20.00 1.66 7.14 2.67 1.61 0.76
s06 185 0.01 14.01 1.39 4.66 2.16 1.56 0.60
s07 1,202 0.00 20.00 1.44 6.46 2.54 1.76 0.70
s08 179 0.01 20.00 0.66 3.22 1.79 2.72 0.18
s09 447 0.00 10.74 1.21 1.85 1.36 1.12 0.71
s10 234 0.01 7.48 0.61 1.32 1.15 1.89 0.08
s11 230 0.01 20.00 1.71 11.05 3.33 1.94 0.67
s12 443 0.00 20.00 1.60 7.37 2.72 1.69 0.66
s13 1,056 0.00 30.00 0.74 2.69 1.64 2.22 0.35
s14 655 0.01 20.00 1.20 4.04 2.01 1.68 0.67
s15 836 0.00 20.00 2.10 12.35 3.51 1.68 0.87
s16 6,104 0.00 30.00 1.46 10.34 3.22 2.21 0.50
s17 98 0.00 20.00 2.83 25.56 5.06 1.79 0.70
s18 2,454 0.00 20.00 1.13 6.06 2.46 2.18 0.33
s19 42 0.02 20.00 2.84 15.41 3.93 1.38 1.03
s20 319 0.00 20.00 1.58 9.39 3.07 1.95 0.57

 

Compositing

The selection of an appropriate composite length began with examination of the descriptive statistics of the sample lengths of the raw assays and preparation of histograms of the sample lengths. Consideration was also given to the size of the blocks that would be used in the block model.

 

The majority of the sample lengths in the various mineralized wireframes were found to be one metre in length, with a small percentage of the samples having larger sample lengths (Figure 14-29). Consequently, on the basis of the available information, RPA believes that a composite length of one metre is reasonable.

 

The capped raw assays were composited individually for each of the 20 mineralized wireframes using the equal length function of the Leapfrog software package. The descriptive statistics of the composite samples for each of the 20 mineralized wireframes are provided in Table 14-26.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-60
 www.rpacan.com

 

 

Figure 14-29 Upper Tail Histogram of the Sample Lengths Within the Mineralized Wireframes - Tap AB Deposit

 

 


Table 14-26   Descriptive Statistics of Capped Composited Assays - Tap AB Deposit
Great Panther Mining Limited - Tucano Gold Mine

 

Domain Count Min Max Mean Variance StDev CV Median
s01 5,462 0.00 20.00 1.65 8.76 2.96 1.80 0.62
s02 3,309 0.00 20.00 1.15 4.01 2.00 1.75 0.61
s03 6,257 0.00 30.00 2.25 27.49 5.24 2.33 0.50
s04 298 0.01 14.93 0.87 2.71 1.65 1.89 0.34
s05 341 0.00 20.00 1.66 7.08 2.66 1.61 0.78
s06 183 0.01 14.01 1.39 4.56 2.14 1.54 0.61
s07 1,263 0.00 20.00 1.44 6.38 2.53 1.75 0.70
s08 173 0.01 20.00 0.66 3.21 1.79 2.72 0.19
s09 451 0.00 10.74 1.21 1.84 1.36 1.12 0.71
s10 230 0.01 7.48 0.61 1.19 1.09 1.79 0.09
s11 232 0.01 20.00 1.71 10.66 3.27 1.91 0.71
s12 422 0.00 20.00 1.60 6.72 2.59 1.62 0.66
s13 1,341 0.00 30.00 0.74 2.67 1.63 2.21 0.35
s14 656 0.01 20.00 1.20 3.99 2.00 1.67 0.67
s15 828 0.00 20.00 2.10 11.23 3.35 1.60 0.90
s16 6,357 0.00 30.00 1.46 9.79 3.13 2.15 0.52
s17 110 0.00 20.00 2.83 24.16 4.92 1.74 0.69
s18 2,636 0.00 20.00 1.13 5.99 2.45 2.17 0.33
s19 43 0.02 16.90 2.84 12.28 3.51 1.23 1.08
s20 328 0.00 20.00 1.58 9.23 3.04 1.93 0.58

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-61
 www.rpacan.com

 

 

Bulk Density

A large number of density measurements (35,076 in total) is available for the various lithological and weathering units present at the Tap AB deposit. A summary of the various measurement methods was provided in Section 10. For the purposes of this Mineral Resource estimate, each of these density measurements was assigned to one of the principal lithological units using the wireframe interpretations described above. Similarly, each of the density measurements were assigned to either oxidized or fresh rock as defined by the interpreted oxidized surface. Only the dry, bulk density measurements were used to code the grade-block model. An example of the distribution of the dry density values for the un-weathered BIF unit is presented in Figure 14-30. A summary of the density values that were coded into the grade-block model is presented in Table 14-27.

 

RPA observes that the density for the oxidized portion of the BIF unit is derived from a limited number of measurements. RPA recommends that additional measurements of the dry bulk density be collected for the BIF unit.

 

Figure 14-30 Histogram of the Dry Bulk Densities for the Un-weathered Banded Iron Formation - Tap AB Deposit

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-62
 www.rpacan.com

 

 


Table 14-27   Summary of Dry Bulk Densities by Lithology - Tap AB Deposit
Great Panther Mining Limited - Tucano Gold Mine

 

Lithology Unit Mean Bulk Density
Oxide, Banded Iron Formation 2.23
Oxide, Other 1.93
Colluvium 1.77
Banded Iron Formation 3.35
Carbonate 3.11
Quartz Sericite Schist 2.84
Pegmatite 2.80
Amphibolite 2.80

 

Trend Analysis

Grade Contouring:

As an aid in carrying out variography studies to understand the continuity of the gold grades in the various mineralized wireframes, RPA prepared a series of traditional longitudinal projections for a selection of the mineralized wireframes present at the Tap AB deposit. For this exercise, a data file was prepared that contained the average (uncapped) gold grade across the entire width of the mineralized wireframe model for each drill hole (and channel sample) that pierced the wireframe model. The resulting average grades of the collection of pierce points for any given wireframe model were then contoured using the contouring function of the GEOVIA Surpac (v. 2019, r1) software modelling package. The results of this contouring exercise are presented in Figures 14-31 through 14-34, inclusive.

 

Examination of the grade distribution for wireframe S03 of the Tap AB deposit reveals that this wireframe has been systematically evaluated by DD at a spacing of approximately 50 m x 50 m to a depth of approximately 200 m below the current mining surface. The density of drill hole and sample information increases at shallow levels as information from grade control drilling programs is available. The drilling has identified several zones of elevated gold grades. In general, the grades within these higher grade zones can be seen to be oriented along a moderate to steep north plunge. In many cases, the down-plunge limits of these higher grade shoots have not been defined by drilling. In contrast, the higher grade zones located immediately below the mining surface in the AB 1 portions of the zone can be seen to occur as pods measuring in the order of approximately 25 m to 50 m in size. In addition, it is important to note that a significant proportion of the higher grade mineralization resides within the digital model of the oxidized material which could have a positive impact on the mine’s performance.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-63
 www.rpacan.com

 

 

The down-plunge limits of many of the higher grade mineralized shoots within the S03 wireframe of the Tap AB deposit do not appear to be defined by drilling in the wireframes examined. Additional drilling is warranted.

 

RPA recommends that the location of the oxidized to fresh rock transition at the Tap AB deposit be determined to a higher degree of accuracy, particularly in the area of the AB 1 deposit.

 

The distribution of the gold grades for wireframes S01, S02, and S16 exhibit similar podiform characteristics.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-64
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-65
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-66
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-67
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-68
 www.rpacan.com

 

 

Variography:

An evaluation of the spatial continuity of the gold grades for the Tap AB deposit began with a review of the number of informing samples for each of the 20 mineralized wireframe models. This review indicated that many of the wireframe models had relatively small volumes with corresponding small numbers of sample information. RPA therefore elected to carry out its evaluation of the spatial continuity of the gold grades for the Tap AB deposit for a selection of the larger wireframes which had a sufficient number of samples to generate meaningful variogram reports.

 

Variograms for these selected mineralized wireframes were prepared using the variography function of the Leapfrog software package. Example variograms for two of the larger mineralized wireframes are presented in Figures 14-35 and 14-36. Summary variogram parameters for wireframes S01, S02 (AB 1 deposit), and S03 (AB 3 deposit) are presented in Table 14-28.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-69
 www.rpacan.com

 

 

Figure 14-35 Sample Variograms, Wireframe S03 - Tap AB 3 Deposit

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-70
 www.rpacan.com

 

 

Figure 14-36 Sample Variograms, Wireframe S02 - Tap AB 1 Deposit

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-71
 www.rpacan.com

 

 


Table 14-28   Summary of Variogram Parameters - Tap AB Deposit
Great Panther Mining Limited - Tucano Gold Mine

 

Item S1 S2
S02 (Nugget (C0 = 0.15)
Type Spherical Spherical
Sill 0.35 0.43
Range (m), Major (Az 218/50) 16.87 79.13
Range (m), Intermediate (Az 355/32) 3.07 36.84
Range (m), Minor (Az 279, 22) 14.34 20.30
S03 (Nugget (C0 = 0.10)
Type Spherical Spherical
Sill 0.27 0.64
Range (m), Major (Az 357, 46) 1.59 12.34
Range (m), Intermediate (Az 194, 42) 3.77 7.95
Range (m), Minor (Az 276, 09) 3.42 5.32

 

Block Model Construction

An upright, non-rotated block model was created by RPA using the Leapfrog software package with the long axis of the blocks being oriented along the strike of the mineralized wireframe models (i.e. to the north). The selected block sizes were five metres in the north-south direction (along strike) by three metres in the east-west direction (across strike), and four metres in height. The block sizes were selected so as to match with the block sizes used for the short term grade control program and daily production planning.

 

The block model used a sub-block approach for coding the wireframes found at the Tap AB deposit, with the minimum sub-block sizes being set at one metre by one metre by one metre. A number of attributes were also created to store such information as gold grades, distances to and the number of informing samples, domain codes, resource classification codes, etc. The block model origins, dimensions, and attributes are provided in Table 14-29, and a list of the attributes used is provided in Table 14-30.

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-72
 www.rpacan.com

 

 


Table 14-29   Summary of Block Model Origin and Extent - Tap AB Deposit
Great Panther Mining Limited - Tucano Gold Mine

 

Type Y X Z
Minimum Coordinates 92,740 401,640 -203
Maximum Coordinates 95,640 402,855 321
User Block Size 5 3 4
Min. Block Size 1 1 1
Rotation 0.000 0.000 0.000

 


Table 14-30   Summary of Block Model Attributes - Tap AB Deposit

Great Panther Mining Limited - Tucano Gold Mine

 

Attribute Type Decimals Description
Mineralization character N/A mineralization pod (s01 to S20)
Category character N/A 2 for blocks inside a mineralization wireframe, 4 elsewhere
density_by_average real 2 density value, t/m3
AU_ID3_FINAL real 5 g/t Au by ID3
AU_NN_FINAL real 5 g/t Au by NN
AU_OK_FINAL real 5 g/t Au by OK. NOTE: only a test, not estimated for all wireframes
mined status character N/A backfill, air, mined, rock
rocktype character N/A backfill=99, air=0 ,mined=0, rock=1, air
rock_type_integer integer N/A backfill=99, air=0 ,mined=0, rock=1, air
cat_integer integer N/A 2 for blocks inside a mineralization wireframe, 4 elsewhere
pit_slope integer N/A

oxide sw=1, oxide se=2, oxide nw=6, oxide ne=7, fresh sw=3,

fresh se=4, fresh nw=8, fresh ne=9, others=5

mined_status 2 character N/A FINAL mined status for reporting: air, backfill, mined, rock
AU_ID3_minD real 5 minimum distance to a sample in AU ID3 interpolation
AU_ID3_Dom character N/A interpolation and domain label
AU_ID3_Est character N/A pass and domain used to interpolate block

 

Search Strategy and Grade Interpolation Parameters

The search strategies used to estimate the gold grades into the block model are summarized in Table 14-31. The dynamic anisotropy function of the Leapfrog software package was used to vary the search ellipse orientations using azimuth and dip information collected from both the hanging wall and footwall surfaces of each mineralized wireframe in turn. Gold grades were estimated for each mineralized wireframe individually using the NN, OK, and ID3 interpolation algorithms using the Leapfrog software package. The gold grades for only selected wireframes were estimated using the OK interpolation algorithm.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-73
 www.rpacan.com

 

 

A three-pass estimation approach with high grade restrictions was applied using “hard” domain boundaries for both selection of composite samples for grade estimation as well as “hard” block model boundaries to control which blocks receive estimated gold grades. Only data contained within the respective mineralized wireframes were used to estimate the gold grades, and only those blocks within the respective mineralized wireframes were allowed to receive grade estimates. Only the capped, composited grades were used to estimate the grades.

 

The gold grades estimated using the ID3 interpolation algorithm were selected for preparation of the Mineral Resource estimate. The gold grades for any blocks lying within the pegmatite unit were reduced to zero. The gold grades for those portions of wireframe S18 that resided within the backfilled area of the AB 1 open pit were reduced to zero to ensure proper reporting of the Mineral Resources.

 

For mine planning purposes, gold grades were also estimated for those volumes for which drill hole and sample information were available and that resided beyond the limits of the mineralized wireframes. The grades for these areas were estimated using composites of the capped gold grades, an isotropic search ellipse, and the ID3 interpolation algorithm. For clarity, these gold grades were estimated for mine planning purposes only and were not considered in any estimates of the Mineral Resources.

 


Table 14-31   Summary of Search Strategies - Tap AB Deposit
Great Panther Mining Limited - Tucano Gold Mine

 

Item Description
Boundary conditions- data Hard
Boundary conditions- blocks Hard
Estimation Pass1 Search Radius 30x20x10; Maximum 3 samples per hole; Minimum 3 samples (Means Minimum 1 drill hole); Maximum 12 Samples; no outlier restriction
Estimation Pass2 Search Radius 60x40x10; Maximum 3 samples per hole; Minimum 3 samples (Means Minimum 1 drill hole); Maximum 12 Samples; 50% distance outlier restriction
Estimation Pass3 Search Radius 120x80x10; Maximum 3 samples per hole; Minimum 3 samples (Means Minimum 1 drill hole); Maximum 12 Samples; 25% distance outlier restriction
Outlier Restriction Threshold

All domains except S10 = 10.00 g/t

S10 = 7.48 g/t

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-74
 www.rpacan.com

 

 

Classification

Definitions for resource categories used in this Technical Report are consistent with those defined by CIM (2014) and adopted by NI 43-101. The classification criteria were developed by consideration of the spatial continuity of the gold grades as suggested by the variograms, the density of available sample information, the degree of confidence in the estimation of the material densities, and the location of the mineralization in relation to the constraining surface (pit shell) used to assist in reporting of the Mineral Resources.

 

All estimated blocks contained within the constraining surface that were within the mineralized wireframe outlines were classified into the Indicated Mineral Resource category. All remaining blocks in the block model that were within the mineralized wireframe outlines but located below the constraining surface were classified into the Inferred Mineral Resource category.

 

All blocks with estimated grades that are located between the mineralized wireframe outlines were not classified.

 

Block Model Validation

Validation of the results of the Mineral Resource block model included visual comparisons, evaluation of the accuracy of the block model coding and global accuracy of the estimated grades, and evaluation of the local accuracy by preparation of swath plots. No reconciliation with the short term grade control block model was carried out.

 

Visual Comparisons:

Visual comparisons between the contoured and estimated gold grades were conducted for selected mineralized wireframes of the various lodes at the Tap AB deposit in longitudinal view (Figures 14-37 to 14-40, inclusive). It can be seen that, while a general agreement is present between the distribution of the estimated gold grades and the contoured drill hole grades for those portions within the Mineral Resource pit surface, differences are present at the local scale.

 

Visual comparisons of the estimated block grades with the drill hole assays showed a similar good general correlation between the estimated grades and the informing samples.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-75
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-76
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-77
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-78
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-79
 www.rpacan.com

 

 

Swath Plots:

Swath plots in section and plan (i.e., bench) views were prepared for selected lodes in which the average capped, composited assays were compared with the average of the estimated block grades. Examples are presented in Figures 14-41 and 14-42. Examination of these plots suggests that good agreement is present between the estimated grades and the informing samples for those portions of the block model containing a high density of drilling and sampling information. Higher variances are observed in areas where the density of sample information is reduced. A degree of smoothing is also observed.

 

Figure 14-41 Swath Plot by Northing, Lode S03 - Tap AB Deposit

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-80
 www.rpacan.com

 

 

Figure 14-42 Swath Plot by Elevation, Lode S03 - Tap AB Deposit

 

 

 

 

On the basis of its review and validation activities, RPA is of the opinion that the long term Mineral Resource block model for the Tap AB deposit is sufficiently acceptable for use in preparing Mineral Resource estimates.

 

Cut-off Grade and Whittle Parameters

Metal prices used for Mineral Reserves are based on consensus, long term forecasts from banks, financial institutions, and other sources. For Mineral Resources, metal prices used are slightly higher than those for Mineral Reserves.

 

A preliminary pit shell was generated using the Lerchs-Grossman optimization method as a constraint in the preparation of the Mineral Resource estimate report. The input parameters are presented in Table 14-32.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-81
 www.rpacan.com

 

 

The sensitivity of the resulting pit shell to variations in the gold price was also investigated for the US$1,600/oz Au and US$1,700/oz Au cases (Table 14-33). It is important to note that the tonnage and grades presented in the sensitivity reports are provided solely for the purposes of estimating the impact of different metal prices. These tonnages and grades are provided on an unclassified basis only and are not to be construed as estimates of the Mineral Resources.

 


Table 14-32   Summary of Mineral Resource Pit Shell Input Parameters - Tap AB Deposit
Great Panther Mining Limited - Tucano Gold Mine

 

Parameter Value
Gold Price (Base Case) US$1,500/oz Au
Exchange Rate US$1:R$3.8

Mining Cost

- oxide

- fresh rock

 

$3.02 /tonne

$3.28 /tonne

Processing Cost

- oxide

- fresh rock

 

$11.93 /tonne

$18.33 /tonne

General and Administration Cost $6.15 /tonne
Gold Recovery 93%

Pit Discard Cut-off Grade

- oxide

-fresh rock

 

0.40 g/t Au

0.55 g/t Au

Overall wall slope angle

- oxide

- fresh

 

36°

43° - 51°

 


Table 14-33   Sensitivity Analysis - Tap AB Deposit
Great Panther Mining Limited - Tucano Gold Mine

 

Gold Price

(US$/oz Au)

Tonnage

(000)

Grade

(g/t Au)

Contained Metal

(000 oz Au)

1,500 1,501 2.39 115
1,600 1,690 2.29 124
1,700 2,224 2.14 153

 

Mineral Resource Statement

The Mineral Resources are inclusive of Mineral Reserves. The Mineral Resources are reported for the open pit component of the Tap AB deposit using excavation surfaces current as of April 19, 2019. A block cut-off grade of 0.55 g/t Au was used to report the fresh rock Mineral Resources and a block cut-off grade of 0.40 g/t Au was used to report the oxide Mineral Resources (Table 14-34).

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-82
 www.rpacan.com

 

 


Table 14-34   Summary of the Open Pit Mineral Resource Estimate as of September 30, 2019 - Tap AB Deposit
Great Panther Mining Limited - Tucano Gold Mine

 

Category

Tonnage

(000)

Grade

(g/t Au)

Contained Metal

(000 oz Au)

Measured - - -
Indicated 1,607 2.33 120
Sub-total, Measured and Indicated 1,607 2.33 120
       
Inferred - - -

 

Notes:

1.CIM (2014) definitions were followed for the Mineral Resource Estimate.
2.The Mineral Resources for the Tap AB Open Pit are estimated using drill hole and sample data as of September 30, 2019.
3.Mineral Resources are estimated at a cut-off grade of 0.40 g/t Au for oxidized material and 0.55 g/t Au for fresh rock.
4.Mineral Resources are estimated using a long-term gold price of US$1,500/oz Au, and a US$/R$ exchange rate of 1:3.8.
5.A minimum width of 3 metres was used for preparation of mineralization wireframes.
6.High gold assays were capped to 20 g/t Au for the AB 1 deposit and 30 g/t Au for the AB 3 deposit.
7.Gold grades estimated using the Inverse Distance (Power 3) interpolation algorithm were used to prepare the Mineral Resource statements.
8.Mineral Resource statements are prepared using constraining surfaces for open pit Mineral Resources.
9.Mineral Resources, which are not Mineral Reserves, do not have demonstrated economic viability.
10.Numbers may not add due to rounding.

 

Tucano is a currently operating, fully permitted mining and processing operation. Consequently, RPA is not aware of any environmental, permitting, legal, title, taxation, socio-economic, marketing, political, or other relevant factors that could materially affect the Mineral Resource estimate. Changes in the commodity prices, operating costs, or metallurgical recoveries could have commensurate impacts upon the Mineral Resource estimates.

 

Underground

RPA reported resources in the underground portion of the Tap AB deposit from the model described above in the open pit section, using drill hole and sample data as of September 30, 2019.

 

Mineral Resource Statement

The Mineral Resources are inclusive of Mineral Reserves. The Mineral Resources are reported for the underground component of the Tap AB deposit using excavation surfaces current as April 19, 2019 and reported below the open pit shell (see Open Pit section of the Tap AB deposit above). To ensure continuity at the underground cut-off grade, RPA constructed shapes within the oxide and fresh rock at Tap AB. Within the oxide rock, reporting shapes were based on a cut-off grade of 2.10 g/t Au and, within fresh rock, reporting shapes were based on a cut-off grade of 1.60 g/t Au. RPA reported all blocks within these volumes as underground Mineral Resources (Table 14-35).

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-83
 www.rpacan.com

 

 


Table 14-35   Summary of the Underground Mineral Resource Estimate as of September 30, 2019 - Tap AB Deposit
Great Panther Mining Limited - Tucano Gold Mine

 

Category Cut-off Grade (g/t Au)

Tonnage

(000)

Grade

(g/t Au)

Contained Metal

(000 oz Au)

Underground        
Oxide 2.10      
Indicated   174 4.94 28
Inferred   1,436 2.33 108
Fresh 1.60      
Indicated   184 4.33 26
Inferred   4,331 2.06 287
Total        
Indicated   357 4.63 53
Inferred   5,767 2.13 395

 

Notes:

1.CIM (2014) definitions were followed for Mineral Resources.
2.Mineral Resources are estimated at various cut-off grades depending on envisioned mining methods and mineralization style.
3.Mineral Resources are estimated using a long-term gold price of US$1,500/oz Au, and a US$/R$ exchange rate of 1:3.8.
4.Mineral Resources are inclusive of Mineral Reserves.
5.Mineral Resource statements are prepared using constraining surfaces for open pit Mineral Resources.
6.Mineral Resources, which are not Mineral Reserves, do not have demonstrated economic viability.
7.Numbers may not add due to rounding.

 

Tucano is a currently operating, fully permitted mining and processing operation. Consequently, RPA is not aware of any environmental, permitting, legal, title, taxation, socio-economic, marketing, political, or other relevant factors that could materially affect the Mineral Resource estimate. Changes in the commodity prices, operating costs, or metallurgical recoveries could have commensurate impacts upon the Mineral Resource estimates.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-84
 www.rpacan.com

 

Urucum East and Duckhead Deposits

Duckhead Deposit

Mineralization at the Duckhead deposit is controlled by the intersection of steep east-west striking shear zones with BIF lithological contacts forming steeply west plunging high grade shoots.

 

RPA reviewed the parameters, workflows, and results used to prepare the block model used to report the 2017 Mineral Resource at Duckhead estimated by AMC. Overall, these were judged to be adequate for preparing updated statements of the updated Mineral Resource. RPA made several modifications to the resource estimated, including the use of a constraining surface resource pit shell to report open pit resources. Underground resources are reported below the pit surface at a higher cut-off grade.

 

No additional work has been incorporated into the Duckhead model since the previous estimate.

 

Topography

A digital copy of the as-mined topographic surface was provided to RPA for the Duckhead deposit that was current as of September 30, 2019. The resulting digital terrain surface (DTM) is available in AutoCAD Drawing Exchange (DXF) format.

 

Resource Database

The Duckhead model was updated with new drill hole results as of February 23, 2017. The drill hole database provided to RPA for review includes 4,821 holes with assays from auger, channel, diamond, RAB, RC, and trenches. Table 14-36 summarizes the subset of 1,735 holes that intersect the mineralized domains at Duckhead.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-85
 www.rpacan.com

 

 

Table 14-36   Summary of the Resource Database - Duckhead Deposit
Great Panther Mining Limited - Tucano Gold Mine

 

Drill Hole Type Count Metres
DDH 72 9,686
RC 1,059 51,971
Channel 20 630
RAB 418 2,577
Auger 133 630
Trench 33 1,209
Total 1,735 66,703

 

RPA conducted several checks on the resource database including a search for unique, missing, and overlapping intervals; a total depth comparison, duplicate holes, property boundary limits, and a visual search for extreme or deviant survey values.

 

The resource database is considered by RPA to be sufficiently reliable for grade modelling and Mineral Resource estimation.

 

Lithological Model

The Duckhead geological model was constructed using 10 m spaced northeast-southwest sections cut oblique to the strike of the stratigraphy. Modelled lithologies include a main BIF unit with internal carbonates, schists, and amphibolites.

 

A weathering surface defining the base of oxidation was interpreted using drill holes.

 

Mineralization Models

Twenty-four mineralized resource domains were interpreted and modelled in three dimensions (3D) using vertical and plan sections. Where there was an adequate amount of data, wireframes were sub-domained into oxide and sulphide for gold grade estimation. Duckhead is characterized by high grade assays in the core of the deposit, and nested grade shells were used to limit smearing and restrict the influence of these data during estimation.

 

The modelling for Duckhead covers the main Duckhead pit and the surrounding smaller deposits.

 

Nominal cut-off grades used to develop nested grade shells are summarized in Table 14-37.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-86
 www.rpacan.com

 

 

Table 14-37   AMC Gold Cut-off Grades used for NEsted Grade

Shells - Duckhead Deposit

Great Panther Mining Limited - Tucano Gold Mine

 

Domain Lode Name Lode Code

Cut-off Grade

(g/t Au)

Main Extreme Grade Core Lode 1 50
  High Grade Envelope Lode 2 2.0
  Low Grade Envelope Lode 3 0.3
       
Hanging Wall High Grade Envelope Lode 4 2.0
  Low Grade Envelope Lode 4 0.3

 

The remaining Duckhead lodes were modelled using a 0.3 g/t Au cut-off grade.

 

RPA recommends that a minimum mining thickness be used when modelling mineralized domains and that wireframes be snapped to assays.

 

Exploratory Data Analysis

AMC calculated statistics for raw assay data by lode domain and weathering sub-domain (if applicable). RPA reviewed the assay statistics and concludes that it accurately summarizes the data.

 

Compositing

AMC created two metre downhole composites inside the mineralized domains beginning at the upper contacts and flagged by lode code. If the remaining length was greater than or equal to 0.95 m, the composite was accepted as part of the dataset; if the remaining length was less than 0.95 m, the composite was not included. Composites with a majority length inside the pegmatite wireframes that crosscut mineralized domains were removed to minimize internal dilution. A total of 8,365 composites were created and used for resource estimation.

 

In RPA’s opinion, a composite length of two metres is appropriate at Duckhead, and there is negligible bias and reduction (or increase) in gold grade between raw assays and uncapped composites. RPA conducted a check on assays and composites within the wireframe models and the results were reasonably consistent with data included in the previous Technical Report.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-87
 www.rpacan.com

 

 

Capping High Grade Values

AMC opted to cap high grade assay data after compositing. Each mineralized domain was reviewed for outliers using logarithmic histograms and probability plots. In domains with uncapped composites, AMC controlled the influence of samples by applying more restrictive ranges during grade interpolations as described below.

 

RPA reviewed the statistical distribution of the original assay and composite data by plotting histograms and log scale probability plots. In RPA’s opinion, the capping values used by AMC on composite samples is acceptable. RPA recommends, however, that capping values be applied to assays prior to compositing.

 

Bulk Density

Within the Duckhead project, 4,516 bulk density measurements are available, within oxide weathering units and within fresh rock. Density measurements were assigned to a lithological unit and interpolated into the block model using the NN method.

 

In RPA’s opinion, the average bulk density values of the lithological units at Duckhead appear reasonable.

 

Variography and Interpolation Parameters

AMC sub-divided capped composites into four groups based on the orientation of the mineralized domain. Lode 1 contains most of the resources at Duckhead and was treated as a separate group.

 

Gold grades were estimated in three consecutive OK passes using the parent cells, hard boundaries, and two metre capped composites. The radius for the first and second pass is based on the variogram ranges and the search ellipsoids are oriented in the same direction as the variogram models. A larger search was used for the third pass to fill all empty blocks. Interpolation and search parameters used by AMC are summarized in Table 14-38.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-88
 www.rpacan.com

 

 

Table 14-38   Summary of Search Parameters - Duckhead Deposit
Great Panther Mining Limited - Tucano Gold Mine

 

Parameter Pass 1 Pass 2 Pass 3
No. Composites (min/max) 4/32 4/32 1/4
Search type Octant Octant -
Optimal Samples per Octants 3 2 -
Min. drill holes 3 2 1
Search radius (% of variogram) 85-90% - -
Search radius X (m) 20-30 40-60 1,500
Search radius Y (m) 30-50 60-100 1,500
Search radius Z (m) 10-20 20-40 100

 

Block Model Construction

AMC constructed the Duckhead block model in the National Grid system (UTM SAD69 Zone 22N) using Surpac software. The estimation was completed in Isatis and imported into the sub-blocked Surpac model. Table 14-39 summarizes the block model parameters at Duckhead.

 

Table 14-39   Block Model Parameters - Duckhead Deposit
Great Panther Mining Limited - Tucano Gold Mine

 

  Easting (X) Northing (Y) Elevation (Z)
Minimum (m) 407,750 87,750 -250
Maximum (m) 409,750 90,250 300
Extents (m) 2,000 2,500 550
Block size (m) 5.0 10.0 2.0
Sub block size (m) 0.625 2.5 1.0
Rotation (° around axis) -45°

 

Classification

Resources were classified based on the confidence in geological knowledge and interpretation, drilling density and orientation, variogram model attributes, including the range of the first structure, and estimation statistics such as slope of regression. AMC visually inspected the classification results and manually re-classified blocks where appropriate.

 

RPA reviewed the classified block model within the open pit shell. RPA re-assigned the blocks previously classified as Measured to Indicated. RPA re-classified all resource blocks below the reporting pit shell to the Inferred category. In RPA’s opinion, the final classified block model is reasonable for this level of study. RPA recommends that the local block classification be adjusted within the open pit in areas where isolated islands of Inferred blocks occur within large areas of Indicated Mineral Resources.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-89
 www.rpacan.com

 

 

Block Model Validation

RPA carried out several block model validation procedures including:

Visual comparisons of block gold values versus composite values, and block density values versus sample point values.
Statistical comparisons.
Comparison of the volumes of the wireframe models to the block model volume results.
Trend plots of block gold values by elevation, northing, and easting.
Comparison of block and composite grades in blocks containing composites.

 

Block grades were visually examined and compared with composite grades in cross section and on elevation plans. RPA found grade continuity to be reasonable and confirmed that block grades were reasonably consistent with local drill hole assay and composite grades and that there was no significant bias apparent.

 

To check for conditional bias, trend plots were created which compared the gold block model estimates with the composite and sample average grades within the preliminary Whittle pit shell. In RPA’s opinion, there is no significant bias between the resource block grades and the assay composites.

 

As a final check, RPA compared the volume of the mineralized domain models to the block model volume results. The volume difference is 1.4%, which RPA considers to be an acceptable result.

 

Validation by RPA indicates that the block model is a reasonable representation of the tonnages and grades of the mineralized zones at Duckhead.

 

Cut-off Grade and Whittle Parameters

Metal prices used for Mineral Reserves are based on consensus, long term forecasts from banks, financial institutions, and other sources. For Mineral Resources, metal prices used are slightly higher than those for Mineral Reserves.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-90
 www.rpacan.com

 

 

A preliminary pit shell was generated using the Lerchs-Grossman optimization method as a constraint in the preparation of the Mineral Resource estimate report. The input parameters are presented in Table 14-40.

 


Table 14-40   Summary of Mineral Resource Pit Shell Input Parameters - Duckhead Deposit
Great Panther Mining Limited - Tucano Gold Mine

 

Parameter Value
Gold Price (Base Case) US$1,500/oz Au
Exchange Rate US$1:R$3.8

Mining Cost

- oxide

- fresh rock

 

$3.02 /tonne

$3.28 /tonne

Processing Cost

- oxide

- fresh rock

 

$11.93 /tonne

$18.33 /tonne

General and Administration Cost $6.15 /tonne
Gold Recovery 93%

Pit Discard Cut-off Grade

- oxide

-fresh rock

 

0.40 g/t Au

0.55 g/t Au

Overall wall slope angle

- oxide

- fresh

 

36°

43° - 51°

 

Mineral Resource Statement

The Mineral Resources are inclusive of Mineral Reserves. The Mineral Resources are reported for the open pit component of the Duckhead deposit using excavation surfaces current as of December 31, 2016 and are constrained by a pit shell. A block cut-off grade of 0.55 g/t Au was used to report the fresh rock Mineral Resources and a block cut-off grade of 0.40 g/t Au was used to report the oxide Mineral Resources (Table 14-40). The Mineral Resources are reported for the underground component of the Duckhead deposit below the pit shell. A block cut-off grade of 1.60 g/t Au was used to report the fresh rock Mineral Resources and a block cut-off grade of 2.10 g/t Au was used to report the oxide Mineral Resources (Table 14-41).

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-91
 www.rpacan.com

 

 



Table 14-41   Summary of the Open Pit and Underground Mineral Resource Estimates as of September 30, 2019 - Duckhead Deposit
Great Panther Mining Limited - Tucano Gold Mine

 

Category Cut-off Grade (g/t Au)

Tonnage

(000)

Grade

(g/t Au)

Contained Metal

(000 oz Au)

Open Pit        
Oxide 0.4      
  Indicated   64 4.36 9
  Inferred   6 1.71 0.4
Fresh 0.55      
  Indicated   118 2.06 8
  Inferred   5 4.14 1
Total        
  Indicated   183 2.87 17
  Inferred   12 2.79 1
         
Underground        
Oxide 2.10      
  Indicated   - - -
  Inferred   33 4.2 5
Fresh 1.60      
  Indicated   - - -
  Inferred   230 2.05 15
Total        
  Indicated   - - -
  Inferred   263 2.32 20

 

Notes:

1.CIM (2014) definitions were followed for Mineral Resources.
2.Mineral Resources are estimated at various cut-off grades depending on envisioned mining methods and mineralization style.
3.Mineral Resources are estimated using a long-term gold price of US$1,500/oz Au, and a US$/R$ exchange rate of 1:3.8.
4.A minimum width of 1 m was used for preparation of mineralization wireframes.
5.Mineral Resources are inclusive of Mineral Reserves.
6.Mineral Resource statements are prepared using constraining surfaces for open pit Mineral Resources.
7.Mineral Resources, that are not Mineral Reserves, do not have demonstrated economic viability.
8.Numbers may not add due to rounding.

 

Tucano is a currently operating, fully permitted mining and processing operation. Consequently, RPA is not aware of any environmental, permitting, legal, title, taxation, socio-economic, marketing, political, or other relevant factors that could materially affect the Mineral Resource estimate. Changes in the commodity prices, operating costs, or metallurgical recoveries could have commensurate impacts upon the Mineral Resource estimates.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-92
 www.rpacan.com

 

 

Urucum East Deposit

Mineralization at the Urucum East deposit occurs within the bedrock and within colluvium. Mineralization within bedrock occurs as a single lode hosted in a wedge of carbonate and altered BIF. The mineralized lode is covered by a blanket of poorly mineralized colluvium.

 

RPA reviewed the parameters, workflows, and results used to prepare the block model used to report the 2017 Mineral Resource at Urucum East estimated by AMC. Overall, these were judged to be adequate for preparing updated statements of the updated Mineral Resource. RPA made several modifications to the resource estimated, including the use of a constraining surface resource pit shell to report open pit resources. Underground resources are reported below the pit surface at a higher cut-off grade.

 

Topography

A digital copy of the topographic surface was provided to RPA for the Urucum East deposit that was current as of September 30, 2019. The resulting DTM is available in DXF format. Although there has been mining activity on the Urucum deposit, no mining has occurred at Urucum East.

 

Resource Database

Table 14-42 summarizes the resource database used to estimate Mineral Resources at Urucum East. The Urucum East drill hole database includes all drilling data available as of August 12, 2013, with samples from RC and DD . No additional drilling has been completed at Tucano since that date.

 

Table 14-42   Summary of the Resource Database - Urucum East Deposit
Great Panther Mining Limited - Tucano Gold Mine

 

Drill hole Type Count Metres
DDH 65 6,252
RC 4 303
Total 69 6,555

 

RPA conducted several checks on the resource database, including a search for unique, missing, and overlapping intervals; a total depth comparison, duplicate holes, property boundary limits, and a visual search for extreme or deviant survey values.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-93
 www.rpacan.com

 

 

The resource database is considered by RPA to be sufficiently reliable for grade modelling and Mineral Resource estimation.

 

Lithological Model

The Urucum East geological model defined the major rock types surrounding the resource area. Modelled lithologies include colluvium, schist, pegmatite, carbonates and calcsilicates, and BIF/iron formation.

 

A weathering surface defining the base of oxidation was interpreted using drill holes. The combination of the lithological and weathering models is the primary basis for assigning global bulk density values.

 

Mineralization Models

A single mineralized domain was modelled within bedrock as an east-west striking, gently dipping tabular body. Mineralization within bedrock occurs as a single lode hosted in a wedge of carbonate and altered BIF within a swarm of barren pegmatite dykes. The overlying colluvium within the Tucano area is poorly mineralized; a separate domain was not modelled, rather the entire lithological model was used for gold estimation. Table 14-43 summarizes the mineralized domains on the Urucum East project.

 

Table 14-43   Mineralized Domains - Urucum East Deposit
Great Panther Mining Limited - Tucano Gold Mine

 

Domain Zone Code
High Grade Lode 100
Colluvium Domain 200

 

Exploratory Data Analysis

AMC calculated statistics for raw assay data by lode domain and weathering subdomain (if applicable). Mineralization within the High Grade Lode is significantly higher grade (mean of 1.7 g/t Au) than within the Colluvium Domain (mean of 0.02 g/t Au). RPA reviewed the assay statistics and concludes that they accurately summarize the data.

 

Compositing

AMC created one metre downhole composites inside the mineralized domains beginning at the upper contacts and flagged by domain code. The residual length remaining when drill hole intersections were not even multiples of the composite length, were distributed equally throughout the composite samples within the intersection. A total of 896 composites were created within the mineralized domains and used for resource estimation.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-94
 www.rpacan.com

 

 

In RPA’s opinion, a composite length of one metre is appropriate at Urucum East. RPA conducted a check on assays and composites within the wireframe models and the results were reasonably consistent with data included in the previous Technical Report.

 

Capping High Grade Values

AMC reviewed high grade values of the one metre assay composites for capping. Each mineralized domain was reviewed for outliers using logarithmic histograms and probability plots. AMC did not apply high grade caps and cited the moderate CV and lack of extreme outliers to support this conclusion. RPA concurs with AMC’s conclusion after reviewing the statistical distribution of original assays and composite data.

 

Bulk Density

Within the Urucum East project, 1,719 bulk density measurements are available, 16% within oxide weathering units and 84% within fresh rock. Density measurements were assigned to a lithological unit and a global bulk density value was assigned to block model by lithology code.

 

In RPA’s opinion, the average bulk density values of the lithological units at the Urucum East project appear reasonable.

 

Variography and Interpolation Parameters

Directional variography was completed on the one metre downhole composites at a lag distance of 25 m. The variograms developed for the High Grade domain followed the structure of the lode, with a maximum range of 76 m down plunge. An omni-directional variogram model with a maximum range of 125 m was modelled for the Colluvium domain.

 

Gold grades were estimated in a single OK pass using the parent cells, hard boundaries, and one metre capped composites. The radius for each pass is based on the variogram ranges. Interpolation and search parameters used by AMC are summarized in Table 14-44.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-95
 www.rpacan.com

 

 

Table 14-44   Summary of Search Parameters - Urucum East Deposit
Great Panther Mining Limited - Tucano Gold Mine

 

Parameter High Grade Domain Colluvium Domain
No. Composites (min/max) 3/20 4/24
Min. drill holes 1 1
Search radius (% of variogram) 100% 100%
Search radius X (m) 76 155
Search radius Y (m) 53 155
Search radius Z (m) 7.6 155

 

Block Model Construction

The Urucum East block model was created in the National Grid system (UTM SAD69 Zone 22N) and block estimation was completed by AMC using Surpac software. Table 14-45 summarizes the block model parameters at Urucum East.

 

Table 14-45   Block Model PArameters - Urucum East Deposit
Great Panther Mining Limited - Tucano Gold Mine

 

  Easting (X) Northing (Y) Elevation (Z)
Minimum (m) 402,600 100,000 0
Maximum (m) 403,250 100,490 320
Extents (m) 650 490 320
Block size (m) 5.0 10.0 2.0
Sub block size (m) 0.625 2.5 1.0
Rotation (° around axis)

 

Classification

RPA reviewed the classified block model at Urucum East. RPA re-classified all blocks within the open pit shell as Indicated and all blocks below the reporting pit shell to Inferred. There are no Measured Resources at Urucum East.

 

In RPA’s opinion, the final classified block model is reasonable for this level of study.

 

Block Model Validation

RPA carried out several block model validation procedures including:

Visual comparisons of block gold values versus composite values, and block density values versus sample point values.
Statistical comparisons.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-96
 www.rpacan.com

 

 

Comparison of the volumes of the wireframe models to the block model volume results.
Trend plots of block gold values by elevation, northing, and easting.
Comparison of block and composite grades in blocks containing composites.

 

Block grades were visually examined and compared with composite grades in cross section and on elevation plans. RPA found grade continuity to be reasonable and confirmed that block grades were reasonably consistent with local drill hole assay and composite grades and that there was no significant bias apparent.

 

To check for conditional bias, trend plots were created which compared the gold block model estimates with the composite and sample average grades within the preliminary Whittle pit shell. In RPA’s opinion, there is no significant bias between the resource block grades and the assay composites.

 

As a final check, RPA compared the volume of the mineralized domain models to the block model volume results. The volume difference is <0.1%, which RPA considers to be an acceptable result.

 

Validation by RPA indicates that the block model is a reasonable representation of the tonnages and grades of the mineralized zones at Urucum East.

 

Cut-off Grade and Whittle Parameters

Metal prices used for Mineral Reserves are based on consensus, long term forecasts from banks, financial institutions, and other sources. For Mineral Resources, metal prices used are slightly higher than those for Mineral Reserves.

 

A preliminary pit shell was generated using the Lerchs-Grossman optimization method as a constraint in the preparation of the Mineral Resource estimate report. The input parameters are presented in Table 14-46.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-97
 www.rpacan.com

 

 


Table 14-46   Summary of Mineral Resource Pit Shell Input Parameters - Urucum East Deposit
Great Panther Mining Limited - Tucano Gold Mine

 

Parameter Value
Gold Price (Base Case) US$1,500/oz Au
Exchange Rate US$1:R$3.8

Mining Cost

- oxide

- fresh rock

 

$3.02 /tonne

$3.28 /tonne

Processing Cost

- oxide

- fresh rock

 

$11.93 /tonne

$18.33 /tonne

General and Administration Cost $6.15 /tonne
Gold Recovery 93%

Pit Discard Cut-off Grade

- oxide

-fresh rock

 

0.40 g/t Au

0.55 g/t Au

Overall wall slope angle

- oxide

- fresh

 

36°

43° - 51°

 

Mineral Resource Statement

The Mineral Resources are inclusive of Mineral Reserves. The Mineral Resources are reported for the open pit component of the Urucum East deposit using excavation surfaces current as of December 31, 2016 and are constrained by a pit shell. A block cut-off grade of 0.55 g/t Au was used to report the fresh rock Mineral Resources and a block cut-off grade of 0.40 g/t Au was used to report the oxide Mineral Resources (Table 14-46). The Mineral Resources are reported for the underground component of the Urucum East deposit below the pit shell. A block cut-off grade of 1.60 g/t Au was used to report the fresh rock Mineral Resources and a block cut-off grade of 2.10 g/t Au was used to report the oxide Mineral Resources (Table 14-47).

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-98
 www.rpacan.com

 

 


Table 14-47   Summary of the Open Pit and Underground Mineral Resource Estimate as of September 30, 2019 - Urucum East Deposit
Great Panther Mining Limited - Tucano Gold Mine

 

Category Cut-off Grade (g/t Au)

Tonnage

(000)

Grade

(g/t Au)

Contained Metal

(000 oz Au)

Open Pit        
Oxide 0.4      
Indicated   143 2.09 10
         
Underground        
Fresh 1.60      
Inferred   100 2.11 7
         
Total        
Indicated   143 2.09 10
Inferred   100 2.11 20

 

Notes:

1.CIM (2014) definitions were followed for Mineral Resources.
2.Mineral Resources are estimated at various cut-off grades depending on envisioned mining methods and mineralization style.
3.Mineral Resources are estimated using a long term gold price of US$1,500/oz Au, and a US$/R$ exchange rate of 1:3.8.
4.A minimum width of 1 m was used for preparation of mineralization wireframes.
5.Mineral Resources are inclusive of Mineral Reserves.
6.Mineral Resource statements are prepared using constraining surfaces for open pit Mineral Resources.
7.Mineral Resources, that are not Mineral Reserves, do not have demonstrated economic viability.
8.Numbers may not add due to rounding.

 

Tucano is a currently operating, fully permitted mining and processing operation. Consequently, RPA is not aware of any environmental, permitting, legal, title, taxation, socio-economic, marketing, political, or other relevant factors that could materially affect the Mineral Resource estimate. Changes in the commodity prices, operating costs, or metallurgical recoveries could have commensurate impacts upon the Mineral Resource estimates.

 

Tap C Deposit

RPA reviewed the parameters, workflows, and results used to prepare the block model used to report the 2017 Mineral Resource at Tap C estimated by AMC. Overall, these were judged to be adequate for preparing updated statements of the updated Mineral Resource. RPA made several modifications to the resource estimated, including the use of a constraining surface resource pit shell to report open pit resources with a topography surface that accounts for all mining activity current as of September 30, 2019.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-99
 www.rpacan.com

 

 

In RPA’s opinion, results from the pit optimization at Tap C demonstrate that the unmined material remaining at Tap C does not satisfy the CIM (2014) requirement of “reasonable prospects for economic extraction”. No Mineral Resources have been reported.

 

RPA recommends that the down-dip projections of the BIF and carbonate units for the Tap C sector be evaluated for their potential of hosting significant quantities of gold mineralization.

 

Comparison to Previous Estimates

A comparison to the previous June 30, 2017 Mineral Resource estimates is provided in Table 14-48 below.

 

Table 14-48 Comparison of Current and Previous Mineral Resource Estimates

Great Panther Mining Limited - Tucano Gold Mine

 

  Measured plus Indicated Inferred
Resource Estimates Tonnes (000) Grade (g/t Au)

Contained Metal

(000 oz Au)

Tonnes (000) Grade (g/t Au)

Contained Metal

(000 oz Au)

June 30, 2017 40,742 1.71 2,240 16,351 2.19 1,150
Depletion   5,681 1.49    271 - - -
Depleted June 2017 Model 35,061 1.75 1,969 16,351 2.19 1,150
September 30, 2019 13,482 2.22     960 11,664 2.16    812
Difference -21,579 0.47 -1,009  -4,687 -0.02   -339
% Difference -62% 27% -51% -29% -1% -29%

 

The 2019 Tucano Mineral Resource estimates result in a 51% reduction in Measured & Indicated gold ounces after accounting for a 62% reduction in ore tonnage and a 27% increase in gold grades.

 

The 2017 estimate was made up of eight block models, two of which used a multiple indicator kriging or “MIK” geostatistical approach (Urucum and TAP AB open pit models). The other six block models (all other deposits, including Urucum North underground) used grade estimation domains and either ordinary kriging or inverse distance interpolation methods. These estimates are described in a Technical Report dated October 31, 2018.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-100
 www.rpacan.com

 

 

The most significant change in the 2019 estimates is the geological interpretation of the mineralized zones. RPA and Great Panther interpreted mineralized zones as discrete lodes, which in turn were used to constrain the block grade estimates. The 2017 resource model used a geostatistical approach with limited manual interpretation, partially due to the predominance of oxide ore mining at the time of that estimate.

 

The 2019 tonnage of open pit resources was further reduced at the resource reporting stage given that the reporting pit shells optimized on the more laterally constrained 2019 model were shallower than those used in 2017.

 

Further reductions are due to changes in the following areas:

The use of pit shells to report the Mineral Resources for the satellite zones, as opposed to an unconstrained approach not using pit shells in the previous estimate.
Additional drill hole information.
Higher cut-off grades for creating the mineralization interpretation that reflects the current operating parameters.
Use of more conservative grade capping to address outlier assays.
Revised compositing lengths and procedures.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 14-101
 www.rpacan.com

15 Mineral Reserve Estimate

Summary

The Mineral Reserve estimate for the Tucano Project conforms to the CIM (2014) definitions as incorporated under NI 43-101 guidelines. To convert Mineral Resources to Mineral Reserves, RPA applied modifying factors of dilution and mineral extraction to only the Measured and Indicated categories of the Mineral Resource. Inferred Resources are not included in the Mineral Reserves. The Mine consists of both open pit and underground Mineral Resources for which Mineral Reserves have been independently estimated.

 

The Mineral Reserve statement for the Mine is presented in Table 15-1. The estimate is based on the newly developed 2019 resource block models as described in Section 14. This Mineral Reserve estimate includes open pit mining in Urucum, Tap AB, Urucum East, and Duckhead and underground mining in the Urucum deposit.

 



Table 15-1   Summary of the Mineral Reserve Estimate as of September 30, 2019
Great Panther Mining Limited - Tucano Gold Mine

 

Category

Tonnage

(000 t)

Grade

(g/t Au)

Contained Metal

(000 oz Au)

Proven      
  Open Pit 1,212 1.79 70
  Underground 189 3.78 23
  Surface Stockpiles 2,446 0.71 56
Probable      
  Open Pit 3,297 2.20 233
  Underground 1,976 4.17 265
  Surface Stockpiles 0 0 0
Proven & Probable      
  Open Pit 4,509 2.09 302
  Underground 2,164 4.13 288
  Surface Stockpiles 2,446 0.71 56
Total Proven & Probable 9,119 2.20 646

 

Notes:

1.CIM (2014) definitions were followed for Mineral Reserves.
2.Open pit Mineral Reserves are estimated within designed pits above marginal cut-off grades that vary from 0.51 g/t Au to 0.62 g/t Au for oxide ore and 0.65 g/t Au to 0.72 g/t Au for sulphide ore. The cut-off grades are derived based on a gold price of US$1,250/oz Au and operating costs sourced from the current operations and mining contracts at an US$/R$ exchange rate of 1:3.8.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 15-1
 www.rpacan.com

 

 

3.Mineral Reserves incorporate estimates of dilution and mineral losses.
4.Underground Mineral Reserves were estimated using an incremental cut-off grade of 2.4 g/t Au.
5.A minimum mining width of 20 m was used for open pit Mineral Reserves and 3 m was used for underground Mineral Reserves.
6.The Mineral Reserve estimate includes surface stockpiles.
7.Average metallurgical process recovery: 93%.
8.Bulk density is 2.19 t/m3.
9.Numbers may not add due to rounding.

 

The base case financial analysis shows that the Tucano life-of-mine plan (LOM) founded on the Mineral Reserve estimates in Table 15-1 provide positive cash flows throughout the mine's operating life, confirming that the Mineral Reserves are economically mineable and that economic extraction can be justified.

 

RPA is not aware of any mining, metallurgical, infrastructure, permitting, or other relevant factors that could materially affect the Mineral Reserve estimate.

 

Open Pit Mineral Reserves

The open pit Mineral Reserves were estimated through the use of mine planning software, the Mineral Resource estimate, the September 30, 2019 topography surface, and mine design parameters described in this Technical Report. The optimized pit shells were used as a guide for the detailed mine design that include pit ramps. The oxide and fresh Mineral Reserve estimates are founded on the whole block mining.

 

Dilution and Extraction

Numerous sources of dilution are considered to account for internal dilution due to resource model block regularization, external dilution resulting from geological/geometric contacts, and operational dilution that accounts for production errors, pressures and schedule demands.

 

For mine planning purposes, all resource models containing selective mining units (SMU) that are considered inadequate for open pit mining operations, including the Tap AB, Duckhead and Urucum East, were re-blocked to a minimum practical size dig block that can be excavated by mining equipment currently employed on site. The total dilution inherited due to SMU regularization was estimated inside the previous pit design and above the resource cut-off grade 0.5 g/t Au.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 15-2
 www.rpacan.com

 

 

The Urucum North resource model, which contains blocks with the partial percent mineralization estimated for percent inside the orebody wireframes, was converted to a whole block model, in order to standardize the entire Urucum model in which the mineralization SMU approximates an entire 3 m x 5 m x 4 m resource block. The dilution during the model conversion inside the pit design and above 0.5 g/t Au cut-off grade was estimated at 10%.

 

The external (contact) dilution has been estimated utilizing the Urucum and Tap AB regularized models (block size 3 m x 5 m x 4 m), both prepared by Tucano Technical Services (TTS). External edge dilution is based on an analysis of the waste blocks in contact with ore blocks. It is estimated that a dilution of approximately 0.5 m will be incurred at the contacts with waste rock during the vein excavation by the ore loading units (i.e., 6.5 m3 hydraulic excavators). The MineSight mining software routine “gndiln.dat” (GNDLN) was utilized to calculate the number of dilution edges (i.e., waste block contacts with an ore block) on a bench by bench basis. The maximum number of waste contacts for an ore block on a particular bench can be four.

 

It is assumed that ore blocks with only one waste contact have a minimum mining dilution (20%) and ore blocks with two, three, or four waste contacts will incur dilution of 40%, 60%, and 80%, respectively. Isolated ore blocks completely surrounded with waste are considered ore loss. In addition, ore loss includes allowances for misdirected truckloads and occasional losses where excessive dilution during excavation reduces the mining grade below the cut-off grade. Weighted external dilution is then calculated on the remaining blocks. External dilution and mineral extraction, based on the Indicated Mineral Resources only and above a cut-off grade of 0.5 g/t Au, are estimated at 19% and 3% in the Urucum pit and 20% and 5% in the Tap AB pit, respectively.

 

In conclusion, since the Tap AB resource model has inherited approximately 23% dilution due to SMU regularization, the additional external (contact dilution) of 20%, normally incurred at the contacts with waste rock during the vein excavation, was considered excessive. The Urucum North model regularization includes 10% dilution. Additional contact dilution of 9% was added to match the 19% total dilution estimated in the other Urucum deposits. Table 15-2 summarizes the dilution and mineral extraction modifying factors used for Mineral Resource to Mineral Reserve conversion.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 15-3
 www.rpacan.com

 

 


Table 15-2   Dilution and Mineral Extraction Estimates
Great Panther Mining Limited - Tucano Gold Mine

 

Area Mineralized Zone

Dilution

(%)

Extraction

(%)

Urucum Fresh Rock 19 95
Tap AB Oxide Rock 23 93
  Fresh Rock 23 94
Urucum East Oxide Rock 10 95
  Fresh Rock 10 95
Duckhead Oxide rock 10 95
  Fresh Rock 10 95

 

Cut-off Grade

In order to determine if material within the open pit should be sent to the mill for processing or to the waste rock dump, a marginal cut-off grade has been calculated. The marginal cut-off grade, which is referred to as the “Open Pit Discard Cut-off” in the CIM Estimation of Mineral Resource and Mineral Reserves Best Practice Guidelines, differs from the breakeven cut-off grade since mining costs are excluded from the calculation. The reason for excluding the mining costs is that material already defined to be within the limits of the open pit must be mined regardless if it is classified as ore or waste in order to access the bench below. The only exception where a mining cost would be included in the marginal cut-off grade calculation is if there is an incremental cost for mining ore relative to mining waste. Therefore, ore related cost such as grade control drilling, ore re-handle and crusher feed, were included along with the processing and G&A costs.

 

RPA estimated a marginal cut-off grade that could be applied to the mine planning block model to initiate the open pit mine planning process for the Tucano Project. The marginal cut-off grades are derived based on a gold price of US$1,450/oz Au for Urucum North and US$1,350/oz Au for the other deposits and operating costs sourced from the current operations and mining contracts at a US$/R$ exchange rate of 1:3.8. The estimated marginal cut off grades are summarized in Table 15-3 for all deposits. A distinction between material types was made (oxide / fresh) in order to capture the variation in mining and processing costs.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 15-4
 www.rpacan.com

 

 


Table 15-3   Pit Marginal Cut-Off Grade Estimate
Great Panther Mining Limited - Tucano Gold Mine

 

Parameters Units URN URCN URCS URS Tap AB DH URE
Revenue                
Gold Price US$/oz Au 1,450 1,350 1,350 1,350 1,350 1,350 1,350
Exchange Rate US$/R$ 3.8 3.8 3.8 3.8 3.8 3.8 3.8
Gold Payable % 99.95 99.95 99.95 99.95 99.95 99.95 99.95
Refining Charges R$/oz Au 77.88 77.88 77.88 77.88 77.88 77.88 77.88
Royalties % 3.14 3.14 3.14 3.14 3.14 3.14 3.14
Process Recovery % 93.0 93.0 93.0 93.0 93.0 93.0 93.0
Net Revenue R$/g 157.2 146.2 146.2 146.2 146.2 146.2 146.2
Operating Cost                
Grade Control R$/t 3.23 3.23 3.23 3.23 3.23 3.23 3.23
Ore Re-handle R$/t 7.80 7.59 7.48 6.88 8.38 8.38 15.24
Crusher Feed R$/t 2.58 2.58 2.58 2.58 2.58 2.58 2.58
Processing, oxide R$/t 45.34 45.34 45.34 45.34 45.34 45.34 45.34
Processing, fresh R$/t 69.67 69.67 69.67 69.67 69.67 69.67 69.67
G & A R$/t 23.38 23.38 23.38 23.38 23.38 23.38 23.38
COG, oxide g/t Au 0.52 0.56 0.56 0.56 0.51 0.57 0.61
COG, fresh g/t Au 0.68 0.73 0.73 0.72 0.68 0.73 0.78

 

Underground Mineral Reserves

The underground Mineral Reserves were estimated through the use of mine planning software, the Mineral Resource estimate, and mine design parameters described in this Technical Report.

 

Cut-off Criteria

Underground Mineral Reserves were estimated using an incremental cut-off grade of 2.4 g/t Au. The basis for this COG is presented in Table 15-4.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 15-5
 www.rpacan.com

 

 


Table 15-4   Underground Cut-Off Grade Estimate
Great Panther Mining Limited - Tucano Gold Mine

 

Item Units  
Production Rate tpd 1,500
Gold Price US$/oz 1,250
Recovery % 93%
Dore Payable % 99.95%
FX $R/US$ 3.8
Refining Cost $R/oz 77.78
Royalties % 3.14%
Ore Value US$/g 35.55
     
Operating Costs    
Mining US$/t 50.00
Milling US$/t 25.00
G&A US$/t 10.00
Total US$/t 85.00
     
COG g/t Au 2.4

 

RPA notes that the incremental costs do not include any development costs or contractor equipment leasing costs.

 

MSO Estimates

The following criteria were utilized for the MSO stope shapes in determining the mining inventories:

The typical stope height is 20 m (i.e., same as the sublevel interval), although some stopes near the upper resource boundaries are 10 m or 15 m in height.
Stope lengths for Up-hole Retreat are 50 m, whereas Avoca stopes are continuous without pillars.
COG of 2.4 g/t Au.
Planned dilution consists of 0.5 m footwall plus 0.5 m hanging wall.
Minimum mining width of 2.0 m (plus 1.0 m of dilution).
Minimum pillar distance between parallel lodes 10.0 m.
Isolated stopes requiring excessive development were not included.

 

The MSO parameters are summarized in Table 15-5.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 15-6
 www.rpacan.com

 

 

Table 15-5 MSO Parameters

Great Panther Mining Limited - Tucano Gold Mine

 

Item Unit Value
Cut-off grade for MSO stope shapes (before dilution added) g/t Au 1.6
Minimum mining width m 2.0
Dilution skin width - total m 1.0
Stope height 1 m 20
Stope height 2 from base m 15
Stope height 3 from base m 10
Stope increment - strike length m 25
Minimum transverse pillar width m 10
Include inventory within pit “reserve” pit design * Flag (1/0) yes
Conduct stope-adjacency smoothing Flag (y/n) no
Reference X start for stope shape grid & extent Easting | m 401880 | 200
Reference Y start for stope shape grid & extent Northing | m 99310 | 1075
Reference Z start for stope shape grid & extent Elevation | m -590 | 800
Maximum weathered rock inside stope shape WEATH=5000 % 10
Block model: "urucum_ug_resources2015_v17" Version | date ugv17d #| 8Oct2015

 

Mining Recovery Factors

The following ore losses were applied to the stope tonnes after the MSO stope shapes were generated (after subtracting the ore development tonnes):

Up-hole Retreat mining areas (mining in a down-dip direction)
6 m rib pillar every 50 m equivalent to 12% ore loss.
2% ore loss for difficult to muck ore at the bottom of stopes.
Total ore loss = 14%.

 

Avoca stoping areas (mining in an up-dip direction)

2% ore loss for difficult to muck ore at the bottom of stopes.

 

Sill pillar recovery

Ore loss = 35% due to mining below unconsolidated rockfill.

 

Ore development recovery

Recovery of development ore has been assumed to be 100% (Note: development dilution is captured in the development wireframes when assessed by Mine24D).

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 15-7
 www.rpacan.com

 

Comparison to Previous Estimates

A comparison to the previous June 30, 2017 Mineral Reserve estimates is provided in Table 15-6 below:

 

Table 15-6 Comparison of Current and Previous Mineral Reserves Estimates

Great Panther Mining Limited - Tucano Gold Mine

 

  Total Proven and Probable
Reserve Estimate Tonnes ('000's) Grade (g/t Au) Ounces ('000's)
June 30, 2017 24,470 1.79 1,406
Depletion   5,681 1.49    271
Depleted June 2017 Model 18,789 1.88 1,135
September 30, 2019   9,119 2.20    646
Difference  -9,670 0.32   -489
% Difference -51% 17% -43%

 

The 2019 Reserve Estimate resulted in a 43% reduction in gold ounces compared to the 2017 Reserve Estimate as the 51% reduction in ore tonnes is partly offset by a 17% improvement in average gold grades.

 

The decrease is primarily due to the change in the underlying Mineral Resources, as well as an increase in cut-off grades to reflect current operating parameters.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 15-8
 www.rpacan.com

16 Mining Methods

Open Pit Mining

The Tucano Gold Mine is a well established open pit mining operation comprising four open pits, Urucum, Urucum East, Tap AB, and Duckhead. The mine production to date has been sourced from all deposits except Urucum East. The mine production history up to September 30, 2019 is summarized in Table 16-1.

 

Table 16-1 Mine Production History

Great Panther Mining Limited - Tucano Gold Mine

 

Pit Production   20151 2016 2017 2018 20192 Total
ROM Mined 000 t 2,621 2,807 2,926 2,441 1,809 12,604
Gold Grade 000 t 1.47 1.66 1.62 1.62 1.63 1.60
Contained Gold 000 oz 124 150 152 127 95 647
Waste Mined 000 t 12,223 16,676 18,354 18,217 14,958 80,428
Total Production 000 t 14,844 19,483 21,279 20,657 16,768 93,032
Strip Ratio W/ROM 4.7 5.9 6.3 7.5 8.3 6.4

 

Notes:

1.Mine production since May 2015
2.Mine production by the end of September 2019

 

Mine production within the presently developed LOM pits is the responsibility of a mining contractor, U&M Mineração e Construção S.A. (U&M), and utilizes conventional earthmoving equipment with drill and blast, load and haul operations. The mined ore is blasted in 4 m benches with backhoe excavators loading ore and waste into off-highway dump trucks. Mined ore is either temporarily stockpiled or fed directly to the crusher.

 

The mining contractors were appointed with effect from 2015. The contractor is responsible for providing the necessary equipment and manpower to meet the LOM production requirements with the current contract rates projected to be used for the entire LOM plan. In addition to earthmoving responsibilities for both waste and ore, the contractors are responsible for production drilling, pre-shear drilling, pit dewatering, ore re-handle, crusher feed, maintenance and supervision of their fleet of equipment.

 

The Tucano Gold Mine has estimated Mineral Reserves of 6.96 Mt at an average ROM head grade of 1.60 g/t Au, comprising 1.97 Mt at 1.36 g/t Au of oxide ore and 4.98 Mt at 1.70 g/t Au of sulphide ore. The overall LOM stripping ratio is approximately 6.0 (tonnes waste per tonne ore mined). In 2019, the pit production averaged close to 62,000 tpd including one month with over 87,000 tpd mined. There has been no underground mining at the Tucano Gold Mine to date.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-1
 www.rpacan.com

 

 

Mine Planning Block Model

The mine planning block models used for the mine design are based on 3D resource block models for the Tucano deposit as presented in Section 14. The resource models contain in situ density, ore/waste codes, oxide/fresh rock codes, lithology codes, mineralization codes, resource classification, ore and waste percentage, and in situ gold grade.

 

Resource models for the Tap AB, Urucum East, and Duckhead deposits are sub-blocked models with various subblock sizes, the smallest size being 0.5 m x 0.625 m x 0.5 m. Since, the subblock size is considered inadequate for open pit mining operations, given the size of the loading units currently in use (i.e., 6.5m3 and 15.0m3 bucket capacity) the resource models have been regularized to a block size of 3 m x 5 m x 4 m for Tap AB, and 2.5 m x 5 m x 4 m for Urucum East and Duckhead. Model regularizations were prepared by Tucano Technical Services. It should be noted that gold grade in the waste blocks was capped at 0.25 g/t Au.

 

The regularized resource block models were utilized for external (contact) dilution and mineral extraction estimate, as explained in Section 15. The total dilution and mineral extraction estimates, presented in Table 15-2, were incorporated in the mine planning block models with diluted block tonnes and diluted gold grades and used for the pit optimization analysis and mine planning. Each block in the regularized model contains the quantities of diluted mineralized tonnes and grades including the tonnages of mining dilution and ore loss, where ore loss (%) = 100% - mining recovery (%).

 

Block sizes of 3 m x 5 m x 4 m in Urucum and Tap AB and 2.5 m x 5 m x 4 m in Urucum East and Duckhead deposits were selected for the mine planning block model. RPA considers this to be a reasonable block size for mining selectivity for the proposed scale of operations and equipment currently in use and notes that the block height is equal to the proposed mining operations bench height.

 

Additional model items coded into the mine planning model are overall pit slopes, TOPO% representing the percent of the block below the September 30, 2019 topographic surface, ore and waste volume and mass per block, gold contained and gold recovered per block, and economic parameters including various costs per block, revenue per block, and block value.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-2
 www.rpacan.com

 

 

Geotechnical Assessment for Pit Slope design

Several geotechnical assessments have been conducted on the Tucano Project. The pit slope design parameters for this study, summarized in Table 16-2, are based on the geotechnical recommendations from the following reports:

Technical Memorandum titled “Tap AB & Urucum pit re-design review” by Peter O’Bryan & Associates, dated May 4, 2016, and
Report titled “Urucum Pit, Slope Stability Analysis” by Luis Navarro geology and services, dated September 2019

 

Different slope configurations were estimated for oxide and fresh rocks because of the difference in competence. Fresh rocks are by nature stronger and able to remain stable at steeper slope angles whereas the oxidized rocks tend to crumble and fail at steep angle.

 



Table 16-2   Geotechnical Design Recommendations
Great Panther Mining Limited - Tucano Gold Mine

 

Material

Bench Face Angle

(º)

Bench Height (m)

Berm Width

(m)

Inter-Ramp Angle

(º)

Urucum
Oxide 70 4 3.0 42
Fresh 75 24 8.0 60
         
Tap AB, Urucum East & Duckhead
Oxide 70 4 3.0 42
Fresh 75 20 8.0 56

 

Other relevant findings and recommendations include the following:

 

Rock Weathering

Rock weathering is significantly deeper in Tap AB than at Urucum. Weathered (weaker) rock is less capable of standing steeply and is more susceptible to run-off erosion. At Tucano, inherent strength differences amongst rock types can, and locally does, result in significantly different responses to weathering and subsequent performance on exposure. For example, BIF rocks and pegmatite intrusions have different weathering susceptibility, where near-surface pegmatites weather deeply and degrade rapidly on exposure, particularly when subject to erosion forces. A benefit of mining in weathered rock however, results from the ability to form the designed wall profile with relative precision due to the ability to mechanically excavate the material.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-3
 www.rpacan.com

 

 

Rock Structure

The orientation and shear strength of naturally occurring defects exposed in or located close behind pit walls have a dominant influence on open pit slope stability, even in highly weathered rocks. It is important that all practicable efforts are made to identify structural defect patterns in weathered rock units. A reasonable starting position is to assume that the defect patterns identified if fresh rock persist into the overlying weathered rock mass.

 

Groundwater

Hydraulic pressures generated by groundwater in pit walls are inevitably destabilising influences. Pit dewatering and wall depressurisation must be accepted as integral components of mining at Tucano. Progressive depressurisation drilling into pit walls (once mining progresses below the pre-mining groundwater level) must be incorporated as a routine task in pit development. Control of inflows and general in-pit drainage must be given adequate priority to minimise degradation of ramp running surfaces and slope erosion generally.

 

Surface water

There is sufficient rainfall run-off at Tucano to cause major pit slope erosion and access / haulage road damage. Significant ponding also occurs locally. Surface drainage at Tucano is inadequate and substantial work is required to redress the situation. Considerations should be given to lining / sealing drains in critical locations. Use of fabrics may also be warranted in reinforcing roadways in critical areas. Plans are also required to reduce inflow to open pit walls and ramps. This will require detailed review of natural drainage around each deposit. The pit catchment is substantial, and it is inevitable that a large volume of run-off will need to be directed to the pit sumps. Considerations needs to be given to lining major drains on the bench stack berms and developing multiple rock-armoured or lined drop structures within each stack.

 

Hard Rock slopes

To achieve the inter ramp angles (IRA) presented in Table 16-2, a certain amount of controlled production blasting is required to minimize blast damage to the pit slope including pre-split drilling in hard rock walls. A substantial improvement is evident in blasting practices conducted to date (Figure 16-1).

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-4
 www.rpacan.com

 

 

Figure 16-1 Pit Wall in Urucum Pit

 

 

Urucum Central South Pit

As noted in the Company’s news releases on October 7, 2019 and October 15, 2019, the west wall of the UCS pit underwent slope displacement on October 6, 2019. Since then, the pit has been closed to mining while GPM works toward a remediation plan with the assistance of the independent consulting firm Knight Piésold & Co.

 

Pending completion of the remediation plan, the UCS pit continues to be included in the LOM Plan, with a Mineral Reserve Estimate (Proven and Probable) of approximately 88,000 ounces of gold. Current estimates for UCS include conservative adjustments to pit wall configurations based on preliminary geotechnical findings.

 

In RPA’s opinion, the reserves are recoverable, however, that recovery is subject to further evaluation based on the geotechnical data gathering now underway. The data gathering will include the collection of additional geotechnical information from five geotechnical core holes commencing in April 2020.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-5
 www.rpacan.com

 

 

Following completion of data collection, an assessment will be made as to whether remediation of the UCS pit to mine the current reserves will be completed.  If the remediation plan is determined not to be feasible, then the current UCS pit reserves may not be mined.

 

If the remediation can be implemented as planned, the Company expects to be in a position to begin remedial work on the west wall of the UCS pit during the third quarter of 2020 and to resume ore mining in the fourth quarter of 2020.

 

Waste Dump Stability

The waste dump slope parameters comprise 10 m high lifts with re-shaped 290 face angles, separated by 7 m wide berms, appropriately graded to control water flow. The resultant slope inclination is 220. Observations and spot measurement of face angles on some as-built dump face angles indicates ranges from 350 to 380. It is understood that these constructions are interim dumps that will be re-shaped in the future.

 

All observed waste dumps were inferred to be fundamentally stable, however reference to original topography and natural surface soil conditions indicates that it is most important to ensure that pre-dumping preparation is thorough. In some instances at Tucano, dump stability could be compromised by foundation inclination, foundation conditions and infiltrations / entrapment of water. A series of simple two-dimensional stability analysis indicates that failure to remove weak clay-rich soils from slightly inclined dump foundations could result in dump slope instability.

 

Pit Optimization

Pit Optimization Input Parameters

The pit optimization analysis was carried out on the diluted regularized block model described in Section Mine Planning Block Model. The pit optimization was carried out using the MS Economic Planner module of Hexagon’s MinePlan software. The optimizer uses the Lerchs-Grossman (LG) algorithm to determine the economic pit limits based on the block net value (block value = block revenue - block total operating cost) and preliminary estimates for pit overall slope angles (OSA).

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-6
 www.rpacan.com

 

 

The OSAs are determined in conjunction with the geotechnical recommendations outlined in Table 16-2 and expected haulage ramp layout, ramp width, and the projected number of ramps in the pit wall. The ramp width is calculated to be 24 m to accommodate a 90-tonne capacity truck and it was considered for two-way traffic. Figure 16-2 illustrates geotechnical sectors utilized in Urucum and Tap AB pits and shows the oxide/fresh rock contact surface used to distinguish sectors in oxide and fresh rock.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-7
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-8
 www.rpacan.com

 

 

The estimated OSA utilized in pit optimization are summarized in Table 16-3.

 


Table 16-3   Pit Overall Slope Angle Estimate
Great Panther Mining Limited - Tucano Gold Mine

 

Pit Rock Type Pit Wall

IRA

(º) of Stack

Stack Height (m) 2-way Ramps # Single Ramps # OSA (º)
Urucum Oxide West 42 60 0 0 42
South Oxide East 42 60 0.5 0 38
(URS) Fresh West 60 120 1 0.5 50
  Fresh East 60 120 1 0.5 50
Urucum Oxide West 42 60 1 0 34
Central Oxide East 42 60 0 0 42
South Fresh West 60 120 1 1 48
(URCS) Fresh East 60 120 1 0 53
Urucum Oxide West 42 60 0 0 42
Central Oxide East 42 60 0 0 42
North Fresh West 60 120 1 0.5 50
(URCN) Fresh East 60 120 1 0 53
Urucum Oxide West 42 60 0 0 42
North Oxide East 42 60 0 0 40
(URN) Fresh West 60 120 1 0.5 49
  Fresh East 60 120 1 0.5 50
Tap AB 1 Oxide West 42 60 0.75 0 36
  Oxide East 42 60 0.75 0 36
  Fresh West 56 200 2 0 48
  Fresh East 56 200 1 0.5 51
Tap AB 3 Oxide West 42 60 0.75 0 36
  Oxide East 42 60 0.75 0 36
  Fresh West 56 200 2 2 43
  Fresh East 56 200 0 0.5 55
Duckhead Oxide West 42 60 1 0 36
  Oxide East 42 60 1 0 36
  Fresh West 56 60 0 1 49
  Fresh East 56 60 0 1 49
Urucum Oxide South 42 38 0 1 36
East Oxide North 42 66 0 0 42

 

The net value for each block was calculated using the model calculation script in Hexagon’s MinePlan Software, based on the set of input economic parameters, i.e., costs, recoveries and long-term gold price assumptions. Operating costs were sourced from the current operations (actual 2019 costs and cost data projected for the 2020 Budget) and unit operating cost from the actual mining contracts. Table 16-4 summarizes the parameters used for the block net value calculation.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-9
 www.rpacan.com

 

 


Table 16-4   Net Block Value Input Parameters
Great Panther Mining Limited - Tucano Gold Mine

 

Parameter Units Value
Resource Classification Categorical Measured & Indicated
Revenue    
Gold Price US$/oz Au 1250
Exchange Rate R$/US$ 3.80
Gold Payable % 99.95
Refining Charges R$/oz Au 77.88
Royalties % 3.14
Process Recovery % 93.00
Re-handled Ore Swell % 30.00
Operating Costs    
Mining Cost, Oxide Ore, Tucano* R$/t 76.02
Mining Cost, Fresh Ore, Tucano* R$/t 101.96
Mining Cost, Oxide Waste, Tucano** R$/t 4.07
Mining Cost, Fresh Waste, Tucano*** R$/t 5.69
Pre-split Drilling Cost, U&M R$/m3 0.91
Mining Cost, Oxide Ore, U&M*** R$/m3 Variable
Mining Cost, Transit Ore, U&M*** R$/m3 Variable
Mining Cost, Fresh Ore, U&M*** R$/m3 Variable
Mining Cost, Oxide Waste, U&M*** R$/m3 Variable
Mining Cost, Transit Waste, U&M*** R$/m3 Variable
Mining Cost, Fresh Waste, U&M*** R$/m3 Variable
Ore Re-handle, U&M**** R$/m3 Variable
Crusher Feed, U&M R$/t 2.58
Block Net Value R$ Block Revenue - Block Cost

 

Notes:

* Tucano fixed ore unit cost: base mining, process and G&A costs, mine geology, grade control and laboratory costs.

**Tucano fixed waste unit base mining cost: dewatering, production drilling, loading, hauling, blasting

***U&M contractor variable unit mining cost (drilling, loading, hauling), dependant on haul distance and associated unit costs defined in the mining contract

****U&M contractor variable unit cost for ore re-handle, dependant on haul distance and associated unit costs defined in the mining contract

 

In accordance with the guidelines of National Instruments NI 43-101 Standards of Disclosure for Mineral Projects and the Canadian Institute of Mining, Metallurgy and Petroleum’s Definition Standards for Mineral Resources and Mineral Reserves, only those ore blocks classified in the Measured and Indicated categories are allowed to drive the pit optimizer for a feasibility level study. Inferred resource blocks, regardless of grade and recovery, bear no economic value and are treated as waste.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-10
 www.rpacan.com

 

 

Pit Optimization results

A series of nested LG pit shells were generated by varying the gold price (revenue factor) from US$1,250/oz Au to US$2,000/oz Au. Nested pit shells are utilized for incremental and net value (i.e., operating margin) analysis to select the pit shell to guide the ultimate pit design. Pit optimization results by pit are summarized in Table 16-5.

 

Table 16-5   Pit Optimization Results

Great Panther Mining Limited - Tucano Gold Mine

 

Pit Shell Gold Price (US$/oz Au) ROM (Tonnes)

Au

(g/t Au)

Gold (oz) Strip Ratio Value R$M
Urucum North            
  1,250 375,743 1.74 21,071 3.21 36.5
  1,350 429,400 1.69 23,332 3.53 36.5
  1,450 766,514 1.64 40,414 6.32 30.8
  1,500 941,210 1.61 48,667 6.86 25.9
  1,550 985,143 1.59 50,459 6.9 24.6
  1,600 1,019,555 1.59 52,229 7.07 23.0
Urucum Central North            
  1,250 981,773 2.13 67,088 6.05 110.2
  1,350 1,039,144 2.11 70,524 6.31 111.0
  1,450 1,075,659 2.09 72,373 6.41 110.5
  1,500 1,086,387 2.09 73,577 6.52 110.2
  1,550 1,124,496 2.08 75,038 6.7 108.5
  1,600 1,266,434 2.04 83,019 7.85 96.1
Urucum Central South            
  1,250 1,319,609 2.27 96,347 6.99 158.5
  1,350 1,449,707 2.22 103,677 7.27 159.0
  1,450 1,581,746 2.18 110,854 7.55 157.3
  1,500 1,591,247 2.17 111,237 7.54 157.2
  1,550 1,619,378 2.17 113,039 7.68 156.0
  1,600 1,680,284 2.15 116,305 7.87 153.3
Urucum South            
  1,250 269,163 1.9 16,406 7.07 29.5
  1,350 334,433 1.83 19,650 7.13 30.1
  1,450 351,640 1.81 20,413 7.14 29.9
  1,500 364,741 1.79 21,008 7.21 29.5
  1,550 385,113 1.77 21,876 7.29 28.8
  1,600 397,383 1.76 22,524 7.47 28.2

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-11
 www.rpacan.com

 

 

Pit Shell Gold Price (US$/oz Au) ROM (Tonnes)

Au

(g/t Au)

Gold (oz) Strip Ratio Value R$M
Tap AB 1            
  1,250 672,314 2.06 44,427 10.61 66.0
  1,350 736,862 2 47,355 10.57 66.4
  1,450 750,944 1.98 47,812 10.49 66.2
  1,500 755,941 1.97 47,944 10.44 66.1
  1,550 763,449 1.96 48,207 10.42 65.9
  1,600 767,402 1.96 48,337 10.42 65.6
Tap AB 3            
  1,250 470,231 2.5 37,726 11.45 64.5
  1,350 509,096 2.43 39,787 11.54 64.6
  1,450 522,464 2.42 40,573 11.64 64.3
  1,500 531,104 2.41 41,180 11.81 64.0
  1,550 532,820 2.41 41,270 11.82 64.0
  1,600 537,441 2.4 41,497 11.83 63.8
Duckhead            
  1,350 227,020 2.64 19,282 20.6 18.7
  1,450 331,636 2.13 22,754 17 16.6
  1,500 336,853 2.12 22,978 16.92 16.3
  1,550 383,542 2 24,627 16.23 14.4
  1,600 404,450 1.96 25,452 16.24 13.1
Urucum East            
  1,450 106,102 1.97 6,721 12.49 6.1

 

Individual pit shell selection was made based on the following criteria:

Urucum North (URN) pit shell was selected for the gold price US$1,450/oz Au since the lower gold price pit shells did not generate the pit that provides adequate mining width for the ultimate pushback relevant to the existing pit
Urucum Central North (URCN) and Urucum Central South (URCS) pit shells are selected for the base gold price of US$1,250/oz Au.
Urucum South (URS) pit shell is selected for the gold price US$1,500/oz Au since most of the stripping is already completed for that pit size
Tap AB 1 (AB 1) and Tap AB 3 (AB 3) pit shells were selected for the gold price US$1,350/oz Au, that provides the highest pit value and considering the minimum mining width for the final pushback
Duckhead (DH) pit shell was selected for the gold price US$1,350/oz Au considering the minimum mining width for the final pushback, since the US$1,250/oz Au shell does not provide the minimum mining width
Urucum East (URE) pit shell was selected for the gold price US$1,450/oz Au.

 

Contained quantities within the selected pit shells are summarized in Table 16-6.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-12
 www.rpacan.com

 

 


Table 16-6   Selected Pit Shell Quantities
Great Panther Mining Limited - Tucano Gold Mine

 

Pit Shell

ROM

(Tonnes)

Au

(g/t Au)

Gold

(oz)

Strip Ratio
Urucum North 766,514 1.64 40,414 6.32
Urucum Central North 981,773 2.13 67,088 6.05
Urucum Central South 1,319,609 2.27 96,347 6.99
Urucum South 364,741 1.79 21,008 7.21
Tap AB 1 736,862 2.00 47,355 10.57
Tap AB 3 509,096 2.43 39,787 11.54
Duckhead 227,020 2.64 19,282 20.60
Urucum East 106,102 1.97 6,721 12.49
Total 5,011,717 2.10 338,002 8.44

 

Pit Design

Mine design criteria are based on a conventional surface mine operation using 15 m3 shovels for waste loading; 6.5 m3 excavators for ore loading; and haulage by a mixed fleet of 36-tonne, 90-tonne, and 136-tonne capacity trucks.

 

The ultimate pit design incorporates pit slope geotechnical parameters (bench face angle, inter ramp angles, and berm widths) for the oxide and fresh rock and pit sectors, includes haulage ramps, and takes into account minimum mining width based on the open pit mining equipment selected. The haul ramps are designed at 24m width for 90-tonne class trucks two-way traffic and will be used as appropriate as single lane ramp for 136-tonne class trucks. For the last four benches of the ramp in the pit bottom, the haul road is narrowed to a width of 10 m, suitable for a 36-tonne class truck single lane traffic. The maximum ramp gradient is 10%. All roads require a cap of crushed rock to facilitate all-season use.

 

The design premise was to mine the pits to a minimum mining width of 30 m, then use a backhoe for the final narrow bench of the pit. To date, there are final pit slopes partially excavated in the Urucum North and Urucum South pits that prove the slope angles recommended in the geotechnical design have been followed. Luis Navarro, a geotechnical consultant, has visited the mine to assess the rock walls and has provided suggestions for practices to improve wall stability. There is a risk that the failure to attain the design pit slopes will result in pit wall instability and the loss of ore at the pit bottom.

 

The pit design parameters are summarized in Table 16-7.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-13
 www.rpacan.com

 

 

Table 16-7 Pit Design Parameters

Great Panther Mining Limited - Tucano Gold Mine

 
Parameter Units Oxide Rock Fresh Rock
Pit Slope      
Bench Height m 4 4
Bench Face Angle deg 70 75
Berm Vertical Interval m 4 24
Berm Width m 3 8.0
Inter-ramp Slope Angle deg 42 60
Pit Ramp Parameters      
Maximum ramp gradient % 10 10
Two-way Ramp Width m 24 24
Single Lane Ramp Width (near pit bottom) m 10 10

 

The open pit design contains eight pits within the selected pit optimization shells utilized to guide the ultimate pit design:

Urucum North (URN)
Urucum Central North (URCN)
Urucum Central South (URCS)
Urucum South (URS)
Tap AB 1 (AB 1)
Tap AB 3 (AB 3)
Duckhead (DH)
Urucum East (URE)

 

All pits have been designed with 4 m operating bench heights. For pits with catch benches at 24 m intervals it may be possible in some higher elevation areas to mine waste rock on 8 m or 12 m high benches, which is more cost effective and may facilitate higher pit sinking rates in terms of vertical metres per year. This is considered a project opportunity that has not been incorporated into the base case mine plan. To maximize ore selectivity and minimize dilution it is expected that ore will be mined only on 4 m benches.

 

The ultimate pit designs in a plan and sectional view are illustrated in Figures 16-3 to 16-10.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-14
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-15
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-16
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-17
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-18
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-19
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-20
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-21
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-22
 www.rpacan.com

 

 

Waste Rock Dump

The waste rock dumps (WRD) are located as close as practical to the open pits to minimize haul distances and haul truck cycle time for each pit phase, considering the pit waste disposal requirements, access road and facility layout, and geotechnical parameters. A portion of the waste rock from the pit is scheduled to be used for the tailings embankment construction. The waste rock dump design parameters include:

Overall dump slope angle of 2. 5H:1V or 22°
A haulage ramp that is 25 m wide at a 10% gradient
A swell factor of 1.15 for placed oxide rock
A swell factor of 1.30 for placed broken fresh rock

 

The waste rock dump designs are illustrated in Figure 16-11 and 16-12.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-23
 www.rpacan.com

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-24
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-25
 www.rpacan.com

 

 

The WRD are constructed in a bottom-up configuration consisting of 10 m vertical lifts. The designed capacities of the waste rock dumps have sufficient capacity to accept the entire waste rock volume that will be mined from the open pits. Backfilling of mined out pits is not proposed either because underground mining is planned beneath the pits or because the pits are not depleted until the end of the open pit mine life.

 

Pit Mining Quantities

Mining quantities are reported from the mine planning block model that contains allowances for dilution and mining extraction, presented in Table 15-2, as material below the end of September 30, 2019 topography to ultimate pit limits. ROM ore quantities and plant feed estimates are founded only on Measured and Indicated Mineral Resources. ROM quantities are based on whole block mining and total 4.5 Mt at a grade of 2.09 g/t Au with a strip ratio averaging 9.3:1. Mining quantities within the designed pits are summarized in Table 16-8.

 


Table 16-8   Pit Mining Quantities
Great Panther Mining Limited - Tucano Gold Mine

 

Pit Shell

ROM

(Tonnes)

Au

(g/t Au)

Gold

(oz)

Strip Ratio
Urucum North 737,279 1.60 37,861 6.06
Urucum Central North 940,809 2.10 63,407 6.84
Urucum Central South 1,192,324 2.30 88,294 7.99
Urucum South 319,092 1.84 18,826 5.60
Tap AB 1 593,473 1.99 37,957 9.64
Tap AB 3 476,406 2.26 34,566 9.08
Duckhead 136,863 3.29 14,490 59.12
Urucum East 112,646 1.95 7,060 14.07
Total 4,508,892 2.09 302,461 9.30

 

Overall, oxide ROM comprises 22% of the total open pit ore tonnage and 34% of total waste tonnage to be mined. Oxide tonnages and grades in Table 16-8, and elsewhere in this document, are reported on a dry basis.

 

It is anticipated that dewatering of the two deepest pits, i.e., Urucum and Tap AB, will involve stage pumping from the pit bottom. Relatively minor pit design revisions are required in order to incorporate intermediate elevation pit sumps and water collection / diversion ditches on the pit highwalls.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-26
 www.rpacan.com

 

 

The mining quantities in Table 16-8 were compared to contained quantities within the pit optimization shells that guided the designs (Table 16-6). The waste rock quantities are within 1% difference. The average gold grade is within 0.5% difference. The designed pits contain 10% less ROM at a 10% higher strip ratio. The lower strip ratio in the pit shells is believed due to approximate allowance for the ramps used in the pit optimization versus the more accurate inclusion of ramps in the pit design. However, the highest discrepancy is noted in Duckhead pit design with the strip ratio three times higher versus LG pit shell, i.e., 59:1 versus 20:1. Therefore, the revision to the Duckhead pit design is warranted and it is recommended that this should be investigated as a project opportunity.

 

Open Pit Production Schedule

A quarterly pit production schedule was generated with the objective of meeting a target processing rate of approximately 10,000 tpd at an average 92% annual plant availability and also to provide sufficient waste fill for the construction of the next stage of the tailings embankment. ROM quantities and plant feed estimates are based on Measured and Indicated Mineral Resources.

 

The mine production schedule has been prepared quarterly based on the mining activities commencing in Q4 2019. The pit production is founded on mining the ultimate pit bench-by-bench without phases or subdivisions. Preproduction stripping is required in Q3 2019 and Q1 2020 in order to prepare the pit Tap AB 1 and Tap AB 3 for sustained plant feed, followed by two full years of operation. Preproduction stripping of the Urucum East and Duckhead pits was delayed as much as possible, due to higher strip ratio. The LOM mining rate averages approximately 66,000 tpd. The maximum mining rate is about 79,000 tpd, only during the dry season, i.e., July to December.

 

The plan feed comprises the ROM from the pit and from the stockpiles. The pit ROM production is projected to be a direct feed to the crusher, complemented with the ROM re-handled on as needed basis. Stockpile inventory as of September 30, 2019 is presented in Table 16-9.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-27
 www.rpacan.com

 

 


Table 16-9   Pit Stockpile Inventory as of September 30, 2019
Great Panther Mining Limited - Tucano Gold Mine

 

Stockpile

ROM

(t)

Au (g/t) Gold (oz)
Total HG Oxide 49,794 0.96 1,540
Total LG Oxide 912,763 0.58 17,129
Total Spent Ore, Oxide 37,139 0.70 839
Total Mill Scats, Sulphide 94,642 1.53 4,664
Total VHG Sulphide 27,720 1.84 1,639
Total HG Sulphide 183,996 0.96 5,699
Total LG Sulphide 617,704 0.63 12,569
ROM pad expansion 522,186 0.70 11,826
Total 2,445,946 0.71 55,909

 

The LOM pit production and plant feed schedule is summarized in Table 16-10 and illustrated in Figures 16-13 and 16-14. The tonnages presented are all on a dry basis.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-28
 www.rpacan.com

 

 


Table 16-10   Open Pit Production Schedule
Great Panther Mining Limited - Tucano Gold Mine

 

Period   Total 2019 2020 2020 2020 2020 2021 2021 2021 2021
  Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Open Pit Mining                      
ROM - Oxide kt 972 69 21 29 98 204 348 190 13 0
ROM - Fresh kt 3,536 501 422 377 337 270 412 431 637 150
Open Pit ROM Total kt 4,509 570 443 406 435 474 760 621 650 150
Stockpile Inventory                      
ROM - Oxide kt 1,000 45 5 93 427 383 47 0 0 0
ROM - Fresh kt 1,446 241 361 322 0 0 0 202 214 107
Stockpile ROM Total kt 2,446 286 366 415 427 383 47 202 214 107
Total ROM, Pit + Stockpile                    
ROM - Oxide kt 1,972 114 26 122 525 587 394 190 13 -
ROM - Fresh kt 4,983 742 783 699 337 270 412 633 851 256
Total ROM, Pit + Stockpile kt 6,955 856 809 821 862 857 806 822 864 256
Au Grade g/t 1.60 1.36 1.33 1.31 1.31 1.32 1.94 1.90 2.17 2.21
Contained Au koz 358 37 35 35 36 36 50 50 60 18
ROM - Oxide Portion % 28% 13% 3% 15% 61% 68% 49% 23% 1% 0%
Waste - Oxide Rock kt 15,802 1,383 803 2,524 3,882 4,012 2,298 879 23 0
Waste - Fresh Rock kt 26,139 4,248 4,195 2,942 2,483 2,268 3,072 4.343 2,430 157
Waste - Total kt 41,941 5,631 4,998 5,467 6,364 6,280 5,370 5,222 2,453 157
Saprolite Portion % 38% 25% 16% 46% 61% 64% 43% 17% 1% 0%
Strip Ratio W/O 6.0 6.6 6.2 6.7 7.4 7.3 6.7 6.3 2.8 0.6
Total Moved - Oxide kt 17,774 1,497 829 2,647 4,407 4,599 2,692 1,068 36 0
Total Moved - Fresh kt 31,121 4,990 4,978 3,641 2,820 2,538 3,484 4,976 3,282 413
Grand Total Moved kt 48,896 6,487 5,807 6,288 7,226 7,137 6,176 6,044 3,317 413
Oxide portion % 36% 23% 14% 42% 61% 64% 44% 18% 1% 0%
Open pit mining rate ktpd 53 71 65 69 79 78 69 66 36 4
Plant Feed                      
Plant Feed from Pit kt 4,509 570 443 406 435 474 760 621 650 150
Plant Feed from Stockpile kt 2,446 285 366 416 426 381 49 201 212 109
Plant Feed - Oxide kt 1,972 114 26 122 525 586 396 189 13 0
Plant Feed - Fresh kt 4,983 741 782 700 337 270 413 633 849 259
Total Plant Feed kt 6,955 856 809 822 862 856 809 822 862 259
Au Grade g/t 1.60 1.36 1.33 1.31 1.31 1.32 1.94 1.90 2.17 2.21
Oxide Feed Portion % 28% 13% 3% 15% 61% 68% 49% 23% 2% 0%
Nominal Rate per Cal Day tpd 9,151 9,299 8,986 9,034 9,365 9,299 8,986 9,034 9,365 8,632
Plant Availability % 91.5% 93.0% 89.9% 90.3% 93.7% 93.0% 89.9% 90.3% 93.7% 86.3%
Feed Rate, Plant Avail 92% tpd 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000
                                           

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-29
 www.rpacan.com

 

 

Figure 16-13 Total Material Mined by Rock Type

 

 

  

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-30
 www.rpacan.com

 

 

Open Pit Operation

Pit Equipment

Open pit mining is currently being undertaken by a mine contractor U&M Mineração e Construção S.A., one of the largest mining contractors in Brazil. The mining operations are based on the use of hydraulic excavators and a haul truck fleet engaged in conventional open pit mining techniques. Excavated material is loaded to trucks and hauled to either the ROM, ore stockpiles, or the waste dump.

 

Waste rock is typically drilled on 8 m high benches by 140 mm drill rigs utilizing a drill pattern of 4.1 m burden by 4.7 m spacing and blasted at a powder factor of 0.798kg/m3. Mineralized rock is typically blasted on 4 m benches by smaller drills (102 mm) utilizing a tighter drill pattern of 2.3 m burden by 2.8 m spacing at the higher powder of 1.26 kg/m3. Due to groundwater inflow at the oxide/transition contact, water-resistant emulsion explosive is utilized. Final pit walls, as well as the temporary pit walls during the phasing are pre-split. Ore and waste are fired together. For wide fresh mineralization, the ore can be blasted separately in order to minimize contact dilution. Excavation of oxide rock does not require drilling and blasting.

 

Ore sent to the ROM is stockpiled on oxide or fresh locations within various cut-off grade categories to facilitate blending to achieve the desired oxide / fresh proportion and grade.

 

Primary ore and waste loading equipment are 6.5 m3 and 15 m3 excavators supported by 4.2 m3 wheel loaders utilized for in pit loading and ore loading at the crusher. Haulage equipment is comprised of 36-tonne, 90-tonne, and 136-tonne truck fleets.

 

The major mine production equipment that U&M uses at the Tucano Gold Mine is outlined in Table 16-11. In addition, there are numerous light vehicles, support units, lighting plants and pumps.

 

Table 16-11   Mining Fleet
Great Panther Mining Limited - Tucano Gold Mine

 

Manufacturer Model Units
Sandvik Drill, Panther 1500i, DX 680 12
Hitachi Excavator, EX-1200 5
Hitachi Excavator, EX-2500 4
Hyundai Excavator, HX-220 6
Caterpillar Loader, 980 5

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-31
 www.rpacan.com

 

 

Manufacturer Model Units
Caterpillar Truck, 740 11
Caterpillar Truck, 777 20
Komatsu Truck, 730 E 6
Caterpillar Dozer, D9 5
Caterpillar Dozer, D6 1
Caterpillar Grader, 16H, 14M 5
Mercedes Truck, 8x4 15
Case Rock Breaker 3
  Road Roller 1
Mercedes, Volvo Water trucks 4
  Fuel Truck 5

 

Mode of Operation

The open pit is scheduled to operate 365 days per year, 24 hours per day. The U&M work schedule utilizes four crews working two 9-hour shifts and one 6-hour shift.

 

Equipment productivity and utilization factors and equipment operating hours estimates per shift depending on seasonal conditions (dry, transitional, or wet season during the calendar year), are summarized in Table 16-12.

 

Table 16-12   Operating Hours per Shift
Great Panther Mining Limited - Tucano Gold Mine

 

Season Days Factor Utilization Operating Hours/Shift
Dry 122 100% 83.0% 6:38
Transitional 92 80% 66.4% 5:18
Wet 151 60% 49.8% 3:59

 

Mine equipment production and utilization factors that impact on equipment operation and fleet size are defined for the various seasonal conditions, rock type, and mining conditions (various bench and ramp widths), as presented in Table 16-13:

 

Table 16-13   Equipment Productivity and Utilization factors
Great Panther Mining Limited - Tucano Gold Mine

 

Mining Condition

Production

Factor

Utilization

Factor

Total Factor Description
Season Factor Trans 95% 84% UR=90% AB=80% Time loss due to lower truck availability; Waiting time due to Waste Dump and access Condition/Maintenance; Productivity loss due to overall harder operation conditions

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-32
 www.rpacan.com

 

 

Mining Condition

Production

Factor

Utilization

Factor

Total Factor Description
Season Factor Trans 90% 67% UR=80% AB=60% Time loss due to lower truck availability; Waiting time due to Waste Dump and access Condition/Maintenance; Productivity loss due to overall harder operation conditions
Fresh Rock Mining 90% 94% 85% Time Loss waiting for drilling; Time loss for Blasting; Productivity loss due to harder digging conditions.
Ore Mining 95% 84% 80% Time loss waiting for Geo Grade control and/or Topography marking; Productivity loss due to selective mining
Bench Width<50m 90% 83% 75% Time loss due to increased truck spotting time; Time loss for dig face advance; Productivity loss due to constrained operational space
Bench Width<25m 80% 63% 50% Time loss due to increased truck spotting time; Time loss for dig face advance; Productivity loss due to constrained operational space
Ramp Width=14m 100% 70% 70% Time loss due to increased time waiting for trucks in single line ramps
Ramp Width=10m 100% 50% 50% Time loss due to increased time waiting for trucks in single line ramps

 

Manpower

The mine is operating, and the mine manpower at the end of September 2019 is summarized in Table 16-14. The mine manpower includes owner and contractor personnel. The ongoing open pit operations will require this level of manpower for most of the next two years. Additional manpower will be required for the underground operations.

 

Table 16-14 Current Manpower

Great Panther Mining Limited - Tucano Gold Mine

 

Area Total
Mine Operations 66
Mine Maintenance  
Mine Engineering 17
Mine Geology 47
Total Mine 130
   
Mill Operations 76
Mill Maintenance 56
Electrical & Power  
Laboratory 4
Total Mill 136
   
G&A 89
Total AGM 355

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-33
 www.rpacan.com

 

 

Area Total
Temporary -
Exploration 26
Total Company 381
   
Contractors 438
U&M 674
Total Contractors 1,112
   
Total Manpower 1,493

 

Underground Mining Methods

The underground mine Project sits below the Urucum North open pit. Access would be via a single portal located at the north end of the Urucum North pit (Figure 16-15). The mine layout is based on the following criteria:

Twin declines accessing the north and south parts of the orebody.
Portal situated on the north side of the Urucum North open pit.
North and south exhaust ventilation raises.
20 m sublevel interval.
Stopes accessed by a footwall drive and crosscuts on every sublevel.
Decline development initiates in Year 1.
Mine plan targets Measured, Indicated and Inferred Mineral Resources down to 500 mRL (750 mbs).

 

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-34
 www.rpacan.com

 

 

Figure 16-15 Longitudinal Section - Urucum North Underground Mine

 

 

Geotechnical Considerations

Geotechnical data from an infill drill program below the Urucum North Pit indicates that the ground conditions at the Urucum North are suitable for open stoping mining methods. Furthermore, stopes measuring 50 m in length and 20 m in height will be feasible. It will be possible to mine multiple benches simultaneously in the same ore block. As the ore lodes are steeply dipping and relatively narrow, they are suitable for a longitudinal version of longhole open stoping.

 

The base of weathering is relatively shallow. It occurs less than 50 m over the orebody and less than 30 m over the country-rock. Consequently, it will have minimal effect on the underground mine. Weathering will, however, be a factor for establishing the portal location and the upper sections of ventilation raises. Furthermore, weathering may be present along major faults and on the contacts of pegmatite dykes.

 

The following rock properties were estimated from the data obtained by logging the core from the infill drill program:

Barton’s rock quality index
Q and Bieniawski’s rock mass rating

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-35
 www.rpacan.com

 

 

RMR

 

These classifications were used to estimate the stable spans for stopes and development as well as the ground control requirements. Safe development spans and support requirements can be estimated using Q. The stable hydraulic radius for determining safe stope spans can be estimated from a modified Q value (Q’) using the modified Mathews stability method (Potvin, 1988). The results of the analyses are presented in Table 16-15.

 

Table 16-15 Range Of Q’ and RMR Values

Great Panther Mining Limited - Tucano Gold Mine

 

Zone/Location Q’ RMR
Min. Max. Avg. Min. Max. Avg.
Hanging Wall North 3.58 16.67 12.4 63 82 74
  Central 2.78 96.71 33.04 63 84 74
  South 3.13 200.00 41.79 60 87 73
Backs North 1.39 33.27 10.39 63 78 73
  Central 3.12 266.67 55.71 63 82 75
  South 1.39 100.00 25.79 72 87 80

 

The Q’ values were used to estimate the modified Mathews stability number (N’) and stable hydraulic radii (HR) for each of the stope zones (hanging wall and back). The stope design factors and hydraulic radii are presented in Table 16-16. The maximum stable unsupported span (MSUS), as well as the length of time it will be stable, are estimated with RMR. These values permit estimating the stability of stoping spans over a short period, ranging from a week to a month, assuming good quality mining practices. The analysis of the data indicates that there is little difference in rock mass condition between the hanging wall and backs of the stopes or between different locations in the orebody. The study uses the same rock mass classification for each zone and location.

 

Table 16-16 Stope Design Factors and Hydraulic Radius

Great Panther Mining Limited - Tucano Gold Mine

 

Q’ N'

Stable HR

(m)

RMR

MSUS

(m)

Lifespan

(days)

12.5 28.1 8.2 76 22 153

 

In the case of stope hanging walls and backs, the term “stable” refers to stability on a large scale with consistent ground conditions. A zone classified as stable may, nevertheless, experience small-scale falls or significant instability in the presence of large structures. Stopes that are accessible to personnel must be provided with an adequate amount of local support.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-36
 www.rpacan.com

 

 

Figure 16-16 presents a graph of the maximum spans for maintaining stable stopes. As indicated on the graph, an unsupported span of 50 m with a 20 m sublevel interval (i.e., 24 m floor to roof) should remain stable for three weeks, provided there are no abnormal conditions.

 

Figure 16-16 Modified Mathews Short-Term Stability Estimate

 

 

 

The maximum strike distance that can be left open will be satisfied with at 50 m spacing of the rib pillars.

 

The crown pillar separating the ultimate pit floor from the upper limit of underground stope excavations is critical to the safety of the mining operations. It must remain stable for the life of the mining operation, either by designing it with an adequate size or by ensuring that it is sufficiently confined to prevent its collapse. Ground support installed in the bottom of the pillar may be required to maintain its stability. The effects of deep weathering adjacent to the pegmatite contacts on crown-pillar stability need to be investigated.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-37
 www.rpacan.com

 

 

The required height of the crown pillar depends on the width of the stope beneath it. The minimum height to width ratio should be 3:1. The actual height can be optimized by controlling the profile of the pillar’s base and by using ground control systems (e.g., cable bolts and shotcrete).

 

The crown pillar must be formed with the minimum height and situated in strong (fresh) rock. It must not be located within the weathered profile or colluvium horizons.

 

Sill pillars require a 2:1 minimum height to width ratio, but in any case, must not be less than 10 m in height. It may be necessary to increase the sill-pillar height to maintain this 2:1 ratio in places where stacked lenses occur, or in wider parts of the orebody.

 

Rib pillars between adjacent open stopes should be at least 5 m high and have a minimum height to width ratio of 1:1. Pillars between lenses, where stacked lenses exist, should have a minimum height of 10 m. For situations in which stacked lenses occur, the extraction sequence should advance from the hanging wall to the footwall. Stopes planned in the footwall of an existing stope should be limited in size. Alternatively, small rib pillars may be left in the ore to reduce the chances of inter-lens pillar failure.

 

Ground Control Requirements

Ground control requirements should be light as ground conditions are expected to be good. Additional support may be needed where excavations cross pegmatite contacts as well as major fault zones. Additional support will be required in zones where poor ground conditions are encountered. This support should be designed by a competent person after inspecting the conditions.

 

The recommended ground support for long-term development drives consists of 2.4 m long rebar bolts installed on a 1.5 m by 1.5 m spacing. The bolting pattern in a typical drift heading consists of lines of bolts with three of them in the back and one in each shoulder. Welded mesh should be installed on the backs and shoulders of the drives if the heading heights impede adequate inspection and scaling. Additional spot bolts should be installed in locations where the joint orientation forms wedges or smaller blocks in the backs or sidewalls. Cable bolts may be required at intersections. Each intersection should be inspected by a qualified person who will determine whether it needs cable bolting.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-38
 www.rpacan.com

 

 

The recommended ground support for ore drives consists of friction bolts installed on a 1.5 m by 1.5 m spacing. Mesh will generally not be required in these drives except in locations with poor ground conditions.

 

Groundwater Hydrology

Minimal groundwater inflows are expected in the underground mine. Possible sources of groundwater could be major cross-cutting faults as well as the contact areas between the pegmatites and the country rock.

 

Mining Methods

The following methods are proposed for mining the Urucum North orebody:

Up-Hole Retreat: In the upper levels of the orebody.
Conventional Avoca: For the remainder of the orebody.

 

Up-Hole Retreat Mining Method

Up-Hole Retreat is a top-down mining method in which the ore is drilled and blasted with up-holes and mining retreats to a centrally positioned crosscut on each sublevel (see Figures 16-17 and 16-18). Backfilling the mined-out void can be delayed by leaving rib pillars to support the sidewalls. In most cases, the large mined-out void will eventually be backfilled with uncemented rockfill to maintain regional ground stability.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-39
 www.rpacan.com

 

 

Figure 16-17 3D Schematic of Up-Hole Retreat Mining Method

 

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-40
 www.rpacan.com

 

 

Figure 16-18 Long Projection Indicating Up-Hole Retreat Mining Sequence

 

 

Conventional Avoca Method

Conventional Avoca, also called longitudinal retreat longhole open stoping, is a bottom-up mining method that is suitable for steeply dipping vein-type orebodies. The orebody is mined from bottom to top in horizons, similar to cut-and-fill and sublevel open stoping. A bench is established at each end of the stope, which retreats along strike toward the centre of the stope. The mined-out part of the stope is progressively backfilled will rockfill such that the waste muck pile advances just behind the retreating bench face.

 

The sublevel interval can vary from 15 m to 30 m but typically is around 20 m. For each horizon that is mined, the upper sublevel crosscut provides access for longhole drill and charging on top of the bench. The bench between sublevel ore drives is usually drilled with downholes from the upper sublevel ore drive. Alternatively, it can be drilled with upholes from the lower sublevel ore drive. The stope is mined from two sides with benches that start out at opposite ends of the orebody. A slot raise extending between the lower and upper sublevels is required to initiate each bench. As it is drilled and blasted, each bench face retreats along strike towards the crosscut at the centre of the stope. For each horizon, the lower sublevel crosscut provides access to the ore drive for the load-haul-dump (LHD) to muck the blasted ore beneath the brow of the bench. A portion of the blasted ore can be mucked with the operator running the LHD, and the remainder must be mucked by radio remote control. When mucking the ore, the operator has to minimize mucking the unconsolidated rockfill on the floor of the drive or from the waste muckpile.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-41
 www.rpacan.com

 

 

The rockfill is usually unconsolidated but cemented rockfill (CRF) can be used to permit future recovery of the sill pillar below the base of an ore block. The stope is progressively backfilled as the bench advances toward the centre of the stope. In Conventional Avoca, a footwall drive is developed at each sublevel to provide access to the extreme ends of the stope. This access permits the LHD (or mine truck equipped with a Teletram dump box) to deliver rockfill into the stope and dump it at the advancing waste muck pile just behind the retreating bench. The waste muck pile is advanced just enough to leave a gap of open stope between it and the bench face that provides a void for blasting one or two longhole rings of the bench.

 

Sill Pillar Recovery

To maximize production rates, the orebody is divided into blocks separated by sill pillars allowing ore production to proceed from multiple mining fronts. The sill pillars will be partially recovered after the stopes above and below them have been mined out and backfilled. The typical sill-pillar height will be 15.5 m, considering a 20 m sublevel interval. Alternatively, thinner sill pillars (e.g., 6 m to 10 m) can be left without making any attempt to recover them.

 

Ventilation

The mine’s ventilation will be a pull-type (exhausting) system. The main ventilation fans will be installed at the collars of the primary exhaust raises. The fans were selected to ensure that all underground workplaces are supplied the required volume of fresh air. Contaminants are removed to the exhaust air system and expelled to surface.

 

Fresh air will enter the mine through the portal and main decline. It will split between the north and south declines that extend to the mine’s lower levels. Fresh air also enters via an assess drive from the open pit, thereby lightening the volume flowing through the declines and ensuring that their air velocities are not excessive.

 

Two primary return air raises will be developed at the northern end of the mine, each one with an exhaust fan installed at its collar. Two exhausting fans provide a degree of redundancy in the ventilation system, which is beneficial in case one of them breaks down or requires maintenance. Internal return raises will be developed while driving the two declines. A return air transfer drift will convey exhaust air from the southern internal return raises to the northern primary raises. The ventilation plan is illustrated schematically in Figure 16-19.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-42
 www.rpacan.com

 

 

Figure 16-19 Long Projection Indication Primary Ventilation System

 

 

The design of the ventilation system provides 350 m³/s of fresh air to the underground operation. This volume takes into account the requirements for diesel equipment, infrastructure, and personnel. Furthermore, it complies with the requirements of the Brazilian Regulatory Standards for Mining (Normas Reguladoras de Mineração) for a production rate of up to 700,000 tonnes per annum (tpa).

 

The main fans on surface will be controlled with VFD (variable frequency drives) so that air volumes can be adjusted during the life of the mine. The vent circuit has been modelled with ventilation network software to determine the peak primary fan duties.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-43
 www.rpacan.com

 

 

Auxiliary ventilation on the levels will be provided by auxiliary vent fans and vent ducting, using the declines as the fresh-air source. The contaminated air will be exhausted via a return air raise that connects to the access drive of each level.

 

Underground Infrastructure and Services

Power Supply and Distribution

Medium voltage electrical power (e.g., 4160 v) will be supplied to the underground mine via the two declines, using separate feeder circuits connected to the site’s main substation. Each feeder will continue down its respective decline.

 

Water Supply and Distribution

Industrial water is already available at the site of the underground-mine project as a result of the existing services for the open pit and processing operations. Water usage is expected to peak at around 7.6 L/s during Stage 1 when the production rate attains 500 ktpa. The water will be delivered underground via 4” diameter steel pipe installed in the back of each decline. Pressure reducing valves will be installed along the water lines at pre-set vertical intervals.

 

Dewatering

As groundwater inflows are expected to be low, a simple dewatering system will be adequate. It will consist of a series of sumps along the declines, spaced at an 80-m vertical interval, and each one will have a submersible pump. The water will be pumped from sump to sump and finally discharged into the dewatering system in the open pit. Intermediate sumps, spaced at a 20 m vertical interval, will drain water to the main sumps via drain-holes.

 

Compressed Air

Two portable electric compressors will supply compressed air to the mine. Compressed air will be required for pneumatically powered equipment, which may include ITH drill rigs, Alimak raise climber, and airleg drills.

 

Emergency Egress

The mine’s emergency egresses will be developed as raises extending from sublevel to sublevel and equipped with regulation-compliant ladderways.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-44
 www.rpacan.com

 

 

Refuge chambers

The mine will have four portable 12-person refuge chambers that will be used during the mine’s development before the escapeway system is established. They will continue to be used once the mine is in production in situations where a second means of egress cannot be provided.

 

Underground Communications

The mine will have a leaky feeder system for communications. Two-way radios will be mounted on every piece of mobile equipment and provided at strategic locations.

 

Underground Service Bay

Underground service bays will be provided for the daily maintenance of the jumbos and production rigs. Most of the maintenance for the mobile equipment fleet, however, will be carried out at the existing maintenance shop on surface.

 

Surface Infrastructure

The underground mine would use some of the existing infrastructure built for the open pit operations such as the explosives magazines and warehouse. Additional surface infrastructure will include the following:

Two 560 kW radial fans will provide ventilation for the mine.
Mine dry change rooms
Lamp room with a capacity for 200 miners’ lamps.
Office facilities for technical services, Operations Control, Electrical and Mechanical Engineering, and Management and Supervision
Surface Workshop including the following facilities:
10 t bridge crane
Offices for maintenance supervision
Toilets and wash basins
Workshop area
Fuel station
Equipment washing area
Mine rescue centre including:
First aid room
Mine rescue and training room
The existing explosive magazines and warehouse facilities will be used for the underground project.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-45
 www.rpacan.com

 

 

Underground Mobile Equipment and Maintenance

The underground mobile equipment has been selected according to the production rates and heading dimensions. Equipment will include:

Epiroc Boomer 282 Two boom development jumbos
Simba H1354 production drills
Volvo A35 underground haulage truck
Ten-tonne tramming capacity LHDs
Epiroc Boltec M ground support rig
A Scaletec UV 2 or a Normet Scaler 2000 mobile mechanized scaler
Mobile rockbreaker
Telehandler for installing services and transporting materials
Caterpillar 12H Grader
Charmec explosives charger
4WD pickup trucks and jeeps for technical staff and supervisors

 

Life of Mine Plan

The underground LOM is presented in Table 16-17. Approximately 2.1 Mt of ore at an average grade of 4.1 g/t Au will be mined and processed over the 6.5 mine life. An evaluation of the planned production rate and scheduling indicates that the deposit supports 450,000 tpa to 500,000 tpa. Production rates vary from year to year depending on the number of production fronts becoming available in different areas of the mine. The production rate could be further optimized as part of any future Feasibility Study (FS).

 

Major scheduling assumptions driving these production rates include: decline and crosscut advance of 140 m/month, ore drive advance of 60 m/month, production rate from stoping of 10,000 t/month for both Uphole retreat and Benching stopes, backfilling rate of 12,000 m3 per month, per stope, for Benching stopes. All scheduling assumptions are based on industry benchmarked data. Scheduling undertaken has been based on maintaining a near constant number of primary mobile equipment in both the North and South declines.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-46
 www.rpacan.com

 

 

Table 16-17 Underground Life of Mine Plan

Great Panther Mining Limited - Tucano Gold Mine

 

    Y1 Y2 Y3 Y4 Y5 Y6 Y7 Total
Stoping Tonnes (000 t) 28.3 288.9 396.2 445.4 370.0 387.2 110.7 2,026.7
  Grade (g/t Au) 3.2 3.2 4.3 5.0 4.4 3.5 3.8 4.1
  Contained Metal (000 oz Au) 2.9 30.0 55.3 72.1 52.2 44.1 13.5 270.1
                   
Ore Development Tonnes (000 t) 1.4 10.3 8.7 33.5 21.1 27.6 4.8 107.5
  Grade (g/t Au) 2.7 2.8 3.0 5.2 3.3 2.8 3.7 3.7
  Contained Metal (000 oz Au) 0.1 0.9 0.8 5.6 2.3 2.5 0.6 12.8
                   
Total Production Tonnes (000 t) 29.7 299.3 404.9 478.9 391.1 414.8 115.5 2,134.3
  Grade (g/t Au) 3.2 3.2 4.3 5.0 4.3 3.5 3.8 4.1
  Contained Metal (000 oz Au) 5.6 32.8 58.3 77.2 55.5 46.9 17.2 282.9
                   
Ore Development Metres (m) 26 177 158 549 357 481 83 1,832
                   
Waste Development                
Horizontal Tonnes (000 t) 218 303 326 322 313 309 147 1,938
Eq Metres m 3,452 4,805 4,797 4,810 4,797 4,797 2,128 29,584
                   
Vertical Tonnes (000 t) 5.9 9.4 6.5 6.9 5.1 6.3 2.9 43.2
Eq Metres Metres (m) 97 157 103 101 78 96 43 675

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-47
 www.rpacan.com

 

Manpower

The underground workforce is presented in Table 16-18. Workforce size at full production is estimated to be 240 employees.

 

Table 16-18 Underground Workforce

Great Panther Mining Limited - Tucano Gold Mine

 

Description Quantity
UG Mining Equipment Operators 100
UG Maintenance Personnel 55
Management and Supervision and Technical Services 52
Surface Maintenance 15
Underground Service Crews 18
Total 240

 

Employees working underground will work seven-hour shifts, but be paid for eight hours on site with the additional hour allowed for meal breaks, showering, etc. The working time “at the face” for underground workers is estimated to be five hours and 45 minutes. The underground workforce will consist of six crews working three eight-hour shifts per day:

Continuous operations - 24 hours per day, 365 days per year, three shifts per day.
7 hours per shift plus 1 hour on surface, with a maximum of 5 hours 45 minutes working at the face.
19 days on, 9 days off basis.
28 days annual leave.

 

Expats will work the following four-panel, two-shift schedule:

Continuous operations - 24 hours per day, 365 days per year, two shifts per day.
12 hours per shift.
14 days on, 14 days off basis.
14 days of annual leave.

 

The work schedule for the senior staff will be non-continuous, consisting of 5 x 12-hour shifts followed by two days off. They will be entitled to 20 days of annual leave.

 

Table 16-19 presents the break-down of the management, supervision, technical services, surface maintenance and underground service crew employees.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-48
 www.rpacan.com

 

 

Table 16-19 Mining Department Employees - Excluding Underground Equipment Operators and Maintenance Personnel

Great Panther Mining Limited - Tucano Gold Mine

 

Position

Max

Number

UG Manager 1
Senior Engineer 1
Mining Engineers 3
Sen Geotech Engineer 1
Technicians 12
UG Foreman 6
UG Workers 20
Senior Geologist 1
Geologists 2
UG Geology Technicians 12
Surveyor 3
UG Survey Technicians 9
Manager 1
Senior Engineer 1
Engineers/Planners 3
Artisans 12
Expert Trainers 6

 

 

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 16-49
 www.rpacan.com

17 Recovery Methods

Summary

The existing Tucano flowsheet consists of a primary jaw crusher feeding a SAG mill/ball mill (SAB) grinding circuit with no pebble crusher. The ground ore is then thickened prior to being treated in a “hybrid” CIL plant consisting of a new single pre-leach tank followed by the original six tank CIL and carbon elution circuit followed by detoxification of tailings.

 

The design is currently based upon mining and processing of 3.4 Mtpa of ore and treating a blend of ore which is predominantly (90%) of the harder sulphide ore type.

 

The Tucano Expansion Project which included a new ball mill, pre-leach thickener, additional single leach tank and oxygen plant was completed by November 2018. An additional oxygen plant was installed and commissioned in April 2019 to further increase DO levels and this equipment was designed to treat 3.6 Mtpa.

 

The description of the current expanded plant is described below and the simplified process flowsheet is illustrated in Figure 17-1.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 17-1
 www.rpacan.com

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 17-2
 www.rpacan.com

 

Crushing and Ore Stockpiling

Ore is delivered to a ROM pad where oxide and sulphide ores are stockpiled separately depending on specified grade ranges. The ores are fed to the crusher hopper by means of a front-end loader to achieve the daily planned sulphide / oxide blend and grade.

 

A vibrating grizzly allows the finer, sticky oxide ore to bypass the crusher. Crushing is achieved using a 1,220 mm x 1,070 mm single toggle TEREX ST-48 jaw crusher with a closed side setting (CSS) of 125 mm. In addition to the jaw crusher, a separate Spent Ore Feeder is located in the emergency stockpile area to facilitate the feeding of spent ore direct to the SAG mill. A surge bin with 30 min residence time and a diversion chute to an emergency stockpile feeder is located halfway between the crusher and the SAG mill.

 

Milling, Classification, and Pre-Leach Thickening

Grinding is achieved with an Outotec SAG mill with a 7 MW single-pinion TECO drive, a diameter of 7.32 m and an effective grinding length (EGL) of 7.95 m in open circuit followed by an Outotec Ball mill fitted with a 6 MW motor. The ball mill operates in closed circuit with a battery of 10 hydrocyclones with a product size which is currently 80% < 75 μm. The plant has two Weir 490 HP cyclone feed pumps at the discharge of the ball mill and the cyclones have an apex of 210 mm with a 5 in. vortex.

 

The addition of the ball mill in 2018 allowed the mill feed tonnage to be maintained at 3.4 Mtpa on the harder sulphide ore types, while also reducing the hydrocyclone overflow P80 size. Hydrocyclone overflow from the grinding circuit is screened to remove trash (i.e., wood chips, plastic, etc.) and is then pumped to the new 28 m diameter Outotec pre-leach thickener. The pre-leach thickener overflow is recycled as process water and recycled to the grinding circuit. The pre-leach thickener underflow is then pumped to the new pre-leach tank.

 

Hybrid CIL Circuit

The Hybrid CIL circuit consists of one 2,650 m3 pre-leach tank followed by six 2,650 m3 (live volume) CIL tanks. There are two objectives in operating the pre-leach tank:

Ensure that the majority of gold is in solution before coming into contact with the carbon, as this vastly increases the carbon adsorption kinetics; and

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 17-3
 www.rpacan.com

 

 

Oxygen is blown into this first tank to ensure that the DO levels are as per the Ausenco recommendation of > 15ppm DO.

 

All seven tanks operate in series. Launders connect the tanks to allow slurry to flow by gravity through the tank train. All tanks are fitted with bypass launders to allow any tank to be removed from service for agitator or screen maintenance.

 

Each tank is fitted with a 110 kW mechanical agitator to ensure uniform mixing. Oxygen is currently maintained in the pre-leach Tank 1 at > 15ppm via a dedicated pulp recycle system and oxygen injection system and the remaining oxygen is added to CIL Tanks 2, 3, and 4. Air is supplied to CIL Tanks 5, 6, and 7. The current system has been in operation since April 2019.

 

Each CIL tank is fitted with a single 12 m2 mechanically swept, wedge-wire inter-tank screen to retain carbon. The style of inter-tank screen selected is known as a “pump screen”, which allows each of the CIL tanks to be installed at the same elevation, in contrast to the stepped arrangement used for conventional cascade carbon-in-pulp (CIP) plants. This arrangement simplified the civil engineering requirements of the CIL area. Barren carbon enters the adsorption circuit at the last tank, CIL Tank 6, and is advanced counter-currently to the slurry flow by moving slurry and carbon from CIL Tank 6 to CIL Tank 5 using recessed impeller carbon-transfer pumps. The inter-stage screen in CIL Tank 5 retains the carbon and the slurry flows by gravity back to CIL Tank 6. This counter-current process is repeated until the carbon reaches CIL Tank 1. A single recessed-impeller pump is used to transfer slurry to a loaded-carbon recovery screen. The carbon reporting as screen oversize flows to the carbon transfer column and the screen undersize returns to CIL Tank 1.

 

The elution circuit is the same elution circuit that was originally designed for the New Gold heap leach operation. The loaded carbon is washed with process water in the carbon transfer column to remove slimes prior to the elution circuit. An eductor, using raw water, transfers the washed carbon to the existing desorption circuit. Barren carbon returning to the adsorption circuit from the carbon regeneration kiln is screened over a vibrating screen to remove fine carbon which is then collected and stockpiled for processing off site. The sized and regenerated carbon reports directly to CIL Tank 6.

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 17-4
 www.rpacan.com

 

 

Sodium cyanide (NaCN) solution is metered into Leach Tank No. 1 and the design allows for additional cyanide to be metered to other tanks as required. Final pH adjustments are made by the addition of lime to the CIL Tank 1 feed box from a lime slurry ring main system. Tailings slurry from the last CIL tank flows to the vibrating carbon safety screen to recover any carbon that may be present due to damage, wear, or incorrect installation of the final stage inter-stage screen. Carbon recovered on the screen is delivered to a bulk bag for re-use. Tailings discharging from the carbon safety screen underflow are transferred via gravity to the cyanide detoxification circuit. The leach and adsorption area has three spillage pumps, which deliver any spillage in the area back to the process. Maintenance of the seven hybrid CIL tanks and agitators is achieved using an overhead crane.

 

The introduction of the pre-leach tank enhances the gold adsorption kinetics of carbon and maintains a leach residence time of 24 h at the planned 450 tph (i.e., 3.6 Mtpa) process capacity.

 

Tailings

Tailings are deposited in the tailings dam located at the north of the plant. The use of the West Pond involves pumping the tailings approximately 3.6 km and the return water initially to 2.7 km and later up to 5.5 km. An air / SO2 cyanide destruction circuit, using sodium metabisulfite (SMBS), lime slurry, and copper sulphate (CuSO4), consists of two tanks in series with a total residence time of 60 min. The circuit lowers the cyanide concentration of the tailings before discharge to the West Pond TSF.

 

The detoxified tailings will leave the circuit at approximately 38% solids. Water is recovered from the TSF and pumped back to the process plant for consumption or neutralization and discharge. Natural degradation and dilution in the dam reduce the cyanide level further in the return water to a concentration of approximately 10 ppm CNtotal. The majority of this return water is re-used in the process plant.

 

However, as the site water balance is positive, a portion of this water needs to be discharged to William Creek.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 17-5
 www.rpacan.com

 

 

Elution

The existing Pressure Zadra elution circuit and gold room were already in place when Beadell acquired the plant from the previous heap leach operation and the CIL plant was configured to use these facilities. The elution columns are primed with a solution of 0.1% cyanide and 1% caustic soda that is prepared in the electrowinning solution tank. This solution is recirculated through the elution columns at 135°C to promote the elution of gold ions that are adsorbed in the micro pores of the loaded carbon. The heating of the recirculating solution is provided by a 720 kW electrical elution heater. The current elution circuit is sized to treat 4.8 tonne of carbon per day. The elution circuit is currently treating 3 to 4 strips (14.4 - 19.2 tonnes/day) specifically to minimise gold inventory in circuit. The management of carbon in the circuit requires an optimisation study to evaluate the quantity of gold in inventory and soluble gold loss versus long term elution costs.

 

Carbon Regeneration

Once the acid wash cycle is complete, the carbon is fed to the kiln feed hopper, where the carbon is screw-fed to the kiln dewatering screen, to dewater the carbon to 50% w/w solids. The undersize flow from the kiln dewatering screen is transferred and collected by the acid wash area sump pump. The kiln dewatering screen oversize reports to the kiln feed hopper. Carbon is withdrawn from the kiln feed hopper by a screw feeder and fed to the carbon regeneration kiln.

 

Carbon regeneration is achieved at a temperature of 700°C. After regeneration, the barren carbon is discharged into the carbon quench tank to reduce the temperature of the carbon to room temperature. The barren carbon is then transferred back to the CIL circuit. The carbon regeneration kiln acquired from the previous heap leach operation has been extensively refurbished by Beadell.

 

Electrowinning and Gold Recovery

The solution leaving the elution columns passes through two heat exchangers, arranged in series, to reduce the solution temperature, then through a cyclone separator to the electrowinning feed tank. The solution flows from the electrowinning feed tank through a bank of two electrowinning cells, where the gold in the solution is deposited on the cathodes within the cells. The barren solution leaves the electrowinning cells and returns to the electrowinning solution tank. This solution is then pumped back through the elution heater to the elution columns. The solution is recirculated through this closed circuit for 12 h, until the deposition of gold onto the cathodes is complete. At the end of the elution cycle, the carbon is transferred to the acid wash column. The barren eluate solution is pumped from the electrowinning solution tank back to the CIL circuit.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 17-6
 www.rpacan.com

 

 

The acid wash cycle consists of a six-hour acid wash, in which 15% hydrochloric acid (HCl) is recirculated through the column, followed by a two-hour water wash. The HCl is delivered to the acid wash column by a dedicated acid wash HCl tank and pump set located in the desorption area.

 

A 15% HCl solution is prepared by diluting 33% HCl from the main acid storage tank with raw water. Wash water is added to the acid wash tank from the main raw water supply. The original design of the elution circuit included a four-hour neutralization cycle using sodium hydroxide (NaOH). However, this step was deemed to be unnecessary during the operation of the heap leach plant and was decommissioned.

 

The gold room was retained from the previous heap leach operation existing operation and consists of a bank of two electrowinning cells. During the electrowinning process, gold is deposited on the stainless-steel wool cathodes in the cells. Following electrowinning, the sludge containing the gold is dislodged from the cathodes using a high-pressure water spray. The sludge is dried in a drying oven before being combined with fluxes and smelted in a furnace.

 

There are two operating furnaces that were retained from the previous heap leach operation, a gas fired furnace and an electric furnace. In smelting, the doré metal and slag separate in the furnace, the molten slag is transferred to slag pots and the doré metal is cast into bars. Doré bars are cleaned, weighed, stamped, sampled, and then stored in a safe contained within a strong room, before dispatch.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 17-7
 www.rpacan.com

18 Project Infrastructure

Context and Regional Infrastructure

The Tucano site is located approximately 185 km from Macapá, the capital of Amapá State, in the Northern coast of Brazil.

 

The site is relatively remote and, for the development of the Tucano property, Great Panther and its predecessors took advantage of the existing infrastructure built in the late 1950s for the Serra do Navio manganese operations (15 km northwest from the Tucano site), and site upgrades established during the 1970s.

 

The main existing infrastructure in the vicinity of Tucano consists of the towns at Serra do Navio and Pedra Branca do Amapari, the road from Macapá to Serra do Navio, the hydropower facilities and transmission line from the Coaracy Nunes complex in the Araguari River (approximately 70 km to the West from the Tucano site), the railway from Macapá do Serra do Navio (currently inactive), and the port at Santana.

 

Macapá and the Santana port, approximately 10 km to the southwest of Macapá, are located in the North canal of the Amazon River. The Santana port can accommodate relatively large ships, as it was built for bulk materials handling and has been in use until recently to handle iron ore from the Zamin property, adjacent to the Tucano site, to the southeast.

 

Macapá is 330 km northwest from Belém, the capital of the state of Pará, in the South canal of the Amazon River. Belém has approximately 1.5 million inhabitants and has a fairly developed industry. It is well connected to the industrial regions in Brazil Southeast and the main region’s hub.

 

Most of the industrial supplies and bulk materials required for Macapá and Tucano are sourced in Southeast Brazil, transported by truck to Belém, ferried to Macapá, and released at the Santana port.

 

Macapá has an estimated population of approximately 500,000 inhabitants. Amapá State, in the north margin of the Amazon River, is considerably less developed than the southernly Pará State. Most of the industrial development of the state was first driven by mining and agro-industrial projects established in the late 1950s.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 18-1
 www.rpacan.com

 

 

There are two small towns near the Tucano site that house most of Tucano employees and their families: Serra do Navio (established as a mine camp to accommodate personnel and their families from the manganese operations in the late 1950s and has approximately 5,100 inhabitants) and Pedra Branca do Amapari (located 30 km southeast of Tucano and has a population of approximately 13,000 people).

 

The Coaracy Nunes hydropower facilities at the Araguari River have a capacity up to 78 MW and are operated by the state-owned CEA, , which is controlled by Centrais Elétricas do Norte do Brasil S.A. (Eletronorte). The facilities were developed in the mid 1970s to support the Serra do Navio and Jari projects and to provide a reliable and affordable alternative to diesel generated energy for Amapá State, which has no links to the remainder of the national grid in Brazil. The 69 kVA transmission line from the Coaracy Nunes complex to Serra do Navio is approximately 70 km long and was installed in the South margin of the Araguari River to its junction to the Amapari River and then follows the railway path to Serra do Navio in the South margin of the Amapari River.

 

Site Access and Logistics

The mine site is located approximately 200 km from Macapá. Road access to Serra do Navio is well established because of the implementation of the manganese operations in the late 1950s and construction of highway BR-210, Rodovia Perimetral Norte in the mid-1970s. Open pit mining operations at Tucano commenced in 2012, when a dedicated road was upgraded from Pedra Branca do Amapari to the mine. This road access comprises:

A sealed road for approximately 100 km, from the port town of Macapá towards Porto Grande;
An unsealed road from Porto Grande to Pedra Branca do Amapari for approximately 75 km.
An unsealed road from Pedra Branca do Amapari to the site, developed specifically for Tucano for approximately 17 km.

 

The journey from Macapá takes approximately four hours by car during the dry season and up to six hours during the wet season, depending on the condition of the unsealed roads. The unsealed roads are passable all year around and no blockages are expected, except during road maintenance.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 18-2
 www.rpacan.com

 

 

The main concern for the transport of personnel, bulk materials, parts, and other supplies is the existence of various wooden bridges along the route with capacity limited to 45 t of total load (carriers plus deadweight). Most of the bridges have been upgraded, allowing for a reliable means of transport to the site. The load limitations have not been a problem for the mine operation or the plant upgrade, as most of the equipment parts were lighter than 25 t average deadweight transported per trip.

 

Diesel for the operation of the mining fleet and for power generation is the main bulk material transported to the Mine. Approximately three Megalitres were initially consumed per month (equivalent to approximately 80 tpd). This demand has decreased to approximately 1.5 Megalitres following the diesel generator power being substituted by hydropower from the transmission lines. Approximately 30 tpd of lime is consumed for neutralization and is sourced from São José da Lapa, Minas Gerais. Sodium cyanide in the form of briquettes is sourced from Bahia and is transported and hydrated at the mine site at a rate as of 250 tpm. In 2019, the average consumption of emulsion was 400 tpm. Emulsion has a lead-time of 12 days to 15 days and is sourced from Lorena in São Paulo state. Balls for milling are consumed at a rate of approximately 150 tpm and activated carbon for the CIL process is consumed at an rate of approximately 24 tpm. The average delivery time for general cargo via road from the Southeast of Brazil to the mine site is 12 days and is less than 20 days with consolidation. Dedicated cargo takes 12 days to 15 days to be delivered to Tucano.

 

A helipad was constructed near the CIL plant and is used to transport product and for emergency removal of personnel. The Tucano Gold Mine site is also serviced by a 1,100 m airstrip located approximately 800 m from the main gate. Charter flights from Macapá to the mine take approximately 50 min.

 

Mining and Support Facilities

The following facilities are located in proximity to the Tucano CIL Gold Plant:

Central administration building and medical facility;
Geology, survey, mining engineering, supply, environment, and safety offices;
Core shed and exploration sample preparation facility; and

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 18-3
 www.rpacan.com

 

 

Nursery.

 

The heavy machinery and light vehicle workshops with adjacent warehouse storage facilities, tire shop, refuelling, and washing bays were constructed to high standards and were upgraded in 2012.

 

The mine planning, administrative, and messing facilities are also located in the workshop area together with the mine control and dispatch room.

 

An explosives magazine and accessories storage constructed to Brazil standards are located at a convenient distance from the other industrial installations. A storage facility for emulsion explosives was built and is operated by the explosive supplier. The installations are fenced and surveyed by armed guards and cameras permanently.

 

Contractor Facilities

U&M, the mine contractor, coordinates and undertakes all heavy machinery maintenance at the main workshop alongside the main supply warehouse. U&M erected a covered workshop area and stores warehouse nearby Urucum pits. Geosol Drilling, the geological drilling contractor, has a separate workshop (and storage sea container near the U&M workshop).

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 18-4
 www.rpacan.com

 

 

Figure 18-1 U&M Workshop Facilities

 

 

Process Plant

The processing plant and administration facilities consist of:

Plant administration buildings;
Plant workshop area;
Power supply and distribution;
Sample preparation and assay laboratory;
Storage area for plant supplies and consumables;
Reagents preparation facilities; and
Security.

 

Water

Raw Water

Raw water consists of fresh water that has not been used in the process and does not contain process reagents or salts. Raw water is consumed at an average rate as of 180 m3/h, while existing permits allow for up to 450 m3/h of consumption.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 18-5
 www.rpacan.com

 

 

Raw water is drawn from the water collection dam and pumped to the lined raw water dam (also known as the ETA dam). The raw water flows from the ETA dam to the existing raw water treatment plant. Lime and aluminium sulphate is added to the raw water before it enters two primary water treatment filters. The raw water then flows to one of two locations: the plant raw water tanks for consumption in the plant or to potable water treatment.

 

From the total 180 m3/h of water flow extracted from William Creek, which is filtered and conditioned (primary treatment), 100 m3/h are directly used to cool the milling equipment. Part of this water evaporates, and the balance is diverted back to the river. The remaining 80 m3/h of water flow after primary treatment, is used at a rate of 72 m3/h for washing and industrial purposes at the various installations (including the mine workshops) and as seal water for the pumps at the plant. The remaining 8 m3/h of water flow are further treated to obtain potable water.

 

Potable Water

Raw water that is used for human consumption is transferred from the primary treatment filters to three filtered water tanks at an average rate as of 8 m3/h. This water is pumped to the potable water treatment plant, where it is further filtered and chlorinated to produce drinking water. This water is transferred from the potable water treatment plant to two potable water tanks. Two pumps (one on duty and one on standby) are used for the distribution of potable water.

 

Process water

Process water consists of recycled and other waste streams used in the process, including return water from the TSF.

 

The plant consumes 900 m3/h of process water (100 m3/h are used in the SAG mill feed, 750 m3/h are used at the mill discharge, and an additional 50 m3/h is used for the preparation of reagents).

 

Process water is stored and sourced from a dedicated process water dam. Water is pumped from the process water dam by four pumps (three on duty and one on standby).

 

Water from the overflow thickener is pumped by two pumps to:

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 18-6
 www.rpacan.com

 

 

Grinding area water - mill trommel screens and trash screen; and
CIL area water - screen spray water and carbon transfer column eductor water.

 

Overflow from the process water dam flows by gravity to the detoxification pond for cyanide destruction prior to discharge to the environment.

 

Power

The Tucano Gold Mine power requirements are provided by two sources:

a 69 kVA, 20 MVA power line via CEA and a local supply authority; and
a 12 MW continuous rated Aggreko diesel-powered generation system.

 

The demand prior to the plant upgrade was approximately 12 MW. At the completion of the additional ball mill and plant upgrade to treat more fresh ore, there was an increase in demand to 17 MW for treating primarily fresh ore. This demand drops to about 15.5 MW when approximately 30% oxide ore is treated.

 

The Aggreko generator facilities have a nominal capacity of 12 MW (partially meeting the current demand), while the CEA line was expanded to meet the total power requirements.

 

The CEA line capacity is currently limited to 20 MVA due to CEA distribution transformer limitations from 138 kVA to 69 kVA. A progressive strategy for the upgrade of the power line and transformers of the CEA line from 1.8 MW (prior to 2017) to 12 MW (already contracted) and, possibly, 15 MW (the final demand after the plant upgrade) has been implemented since 2017. The 70 km long 69 kVA transmission line from the Coaracy Nunes facilities to the Mine has been continually upgraded and maintained and the capacity as of the fourth quarter of 2019 is 10 MW, resulting in substantial savings on diesel costs. A 30 MVA transformer from 138 kVA to 69 kVA to support the expansion of the capacity of the CEA line is in the late stages of procurement.

 

Fire Protection

There is a fire protection system next to the fuel storage and dispensing area and another one on the outdoor premises of the warehouse area. In both cases, the systems consist of a tank and three fire pumps. Additional local fire protection equipment near the oxygen plant location has been provided.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 18-7
 www.rpacan.com

 

Communications

Mina Tucano has three rented interconnected PBXs. There are two Enterprise PCX services at the Tucano Gold Mine site with 300 extensions; one in the plant/administration area and the other at the residential camp. The third Enterprise PCX is at the Rio de Janeiro office and consists of one Embratel Link with 30 lines and up to 100 extensions.

There is one internet radio connection to Macapá and one Fibre Optic connection;
At Rio de Janeiro there are two redundant fibre optic links;
Great Panther has three VPN site to site connections between the Rio de Janeiro office and the Tucano Gold Mine, using the two Rio links and the three Tucano links;
Fibre optic links are available, with radio redundancy, between the mine areas, accommodation, and industrial areas of the mine; and
Network equipment based on Fast Ethernet and Giga Ethernet LAN and WIFI.

 

Light vehicles and mine equipment are equipped with mobile radios, and there are portable radios for operations personnel. Mina Tucano currently has 182 vehicle and equipment mounted radios, 216 hand portable radios, and 10 repeaters on the site.

 

Security

The main entrance security office is located at the Main Site access road. All visitors to the mine complex report to this security gate for authorization prior to entry. Additional fencing is provided for further safety and security within process plant areas, such as the gold room area, transformers, and substations. A closed-circuit television system is installed in the plant and gold room to monitor activities.

 

Personnel and Personnel Logistics

The mine currently employs a total of 381 staff on its books and 1,112 contractors.

 

The personnel living in Amapá account for approximately 80% of the workforce. Most of the workforce live in towns near the mine site with transport to Serra do Navio and Pedra Branca do Amapari provided by Great Panther on a daily basis. Personnel from Macapá also have transport provided by buses on a weekly basis.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 18-8
 www.rpacan.com

 

 

Managers and professional staff either commute from the state capital Macapá, or from other cities in Brazil on a FIFO basis.

 

Shift workers work a rotating eight hour shift over a 24-hour period with a roster in days of 6 on 1 off, 6 on 2 off, and 6 on 3 off basis. Managers and professional staff either work a roster in days of 19 on, 9 off or 5 on, 2 off.

 

Accommodation and Medical Care

There is a 142-person accommodation camp located to the east of the old leach pads, near the access road to the site. Senior staff use the cabins in blocks of four in the upper part of the camp. Technical staff are accommodated in a longer barracks-style building downhill from the cabins. The rooms in the accommodation camp are air-conditioned and equipped with a refrigerator, writing desk, television, bed, bedside table and lamp, microwave oven, chair, ensuite shower and toilet, and cupboards for clothing.

 

Communications for personal purposes are provided at the lodging via telephone and Wi-Fi connections.

 

The camp also has a well-equipped gymnasium, games room, laundry, and restaurant area for ordering meals.

 

Medical facilities are close to the administrative offices and a medical doctor on business days from Monday to Thursday, and nurses are permanently at the mine site to provide first care and treatment to Great Panther employees and contractors. There is provision for emergency removal of personnel either by ambulance, a mobile intensive care unit, and helicopter or plane, if needed.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 18-9
 www.rpacan.com

 

Tailings Storage Facilities

Tailings Operation

The Tucano plant produces an average of 3.9 Mtpa of tailings (dry basis) from the gold beneficiation process; the tailings slurry is delivered to the TSF via a fixed pipeline and is subaerially discharged into the various TSF as a slurry at around 36% solids concentration (w/w). Tailings settle out in the TSF to an average dry density of 1.2 t/m3, and supernatant water is removed from the pond via floating vertical pumps for recycle back into the plant circuit.

 

A water balance of the LOM facility prepared by SRK (project BDR020 Water Balance Update) was used to determine spillway capacity, water reclaim availability, and storm management controls. The conclusions of the SRK report indicated that on average, the plant water demand can be met (no deficits in water availability) throughout the LOM. It is expected that the facilities will spill for post-closure conditions.

 

The LOM tailings production remaining based on current reserves, from January 2020 until December 2021 is expected to be approximately 6.1 Mt, or a volume of 5.8 Mm3.

 

SRK has audited these facilities since commissioning of the TSF, with a focus on safety and operational capacity of the embankments, pond size, and ongoing construction of the facilities. The following audits and site visits have been undertaken by SRK:

January 6, 2014 - January 7, 2014: Mr. Juan Moreno;
November 16, 2014 - November 18, 2014: Mr. Juan Moreno and Mr. Nicholas Thompson;
November 11, 2015 -November 16, 2015: Mr. Juan Moreno;
October 19, 2016 - October 21, 2016: Mr. Juan Moreno;
March 12, 2017 - March 15, 2017: Mr. Matheus Rocha; and
April 18, 2018 - April 21, 2018: Mr. Rubens Rocha.

 

Description of the Constructed TSF

The Tucano TSF system consists of three installations currently in operation: Tap D, North Mill Pond (NMP) and West Pond Phase 1 (WPP1), the latter two are separated by an elevation of 2 m (EL. 135.00 to EL.137.00) and called NMP only. A summary of the storage capacity of these facilities is provided in Table 18-1.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 18-10
 www.rpacan.com

 

 

The remaining capacity of NMP is 1.9 Mm3 as of December 11, 2019, which covers storage for 6.0 months, or from December 2019 to June 2020.

 

Tucano Gold Mine plans to extend the tailings storage capacity by commissioning three new TSFs, East Dam, East-NW Extension and West Pond Phase 2 (WPP2).

 

Table 18-1 Summary of TSF Storage Capacity - Updated on December 11, 2019

Great Panther Mining Limited - Tucano Gold Mine

 

Facility

Tailings volume stored

(m3)

Remaining storage capacity

(m3)

Tap D 6,200,000 Nil
NMP 6,992.627 807,373
WPP1 4,483.704 1,072,423
Total 17,676.331 1,879,796

 

Tap D TSF

The Tap D TSF integrates three embankments and a small saddle wall that close a small valley just east of the process plant. The TSF includes two pits within its basin; namely Tap D1 and D2. SRK designed and supervised the construction of this facility.

 

The walls were named Wall 1, Wall 2, Wall 3, and Wall 4; these are shown in Figure 18-2. The design of these walls was provided in the Design Report (SRK projects BDR001 and BDR008). All the embankments are built with homogenous fills of low permeable material. The borrow material for the walls is a silty sand to sandy silt residual soil. A typical cross section of these walls is shown in Figure 18-3.

 

Active deposition in the Tap D TSF ceased in 2014 and it is dormant. The facility has not yet reached capacity and Great Panther has strategically opted to retain it as a contingency for emergency deposition, as it is located downstream of the mill. The Tap D TSF has received intermittent tailings discharge on occasions, but it has been reported as minimal. The remaining capacity is not significant, however, some contingency for emergency deposition is available since the current freeboard is significantly larger than the required (+3 m) and floating pumps are still operating in the basin.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 18-11
 www.rpacan.com

 

 

West Pond Phase 1 TSF

The construction of WPP1 TSF was completed in 2014 and was designed by SRK at RL 135m elevation and storage capacity of 5.7 Mm3. WPP1 TSF operating from 28 August 2014 to 28 September 2016.

 

The WPP1 TSF integrates five walls that close a small valley approximately 1.5 km north east of the process plant. SRK designed and provided partial supervision of the construction of this facility.

 

The walls were named Wall 11, Wall 12, Wall 13, Wall 14, and Wall 15; these are shown in Figure 18-4. The design of these walls was provided in the Design Report for SRK project BDR005.

 

The highest embankment is Wall 1, which is 33 m high, with the remaining walls being less than 15 m high.

 

All the embankments are designed as homogenous fills of low permeability material, with slope gradients at 2.5H:1V and 5 m wide crests. A downstream drainage and seepage collection system for long-term seepage control has been considered for Walls 11 and 12. A typical cross section for Wall 11 is presented in Figure 18-5 for reference.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 18-12
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 18-13
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 18-14
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 18-15
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 18-16
 www.rpacan.com

 

 

North Mill Pond TSF

The NMP TSF is a valley-type impoundment bounded by the WPP1 TSF to the north and Tap D TSF to the south. The NMP facility was intended to act as a temporary measure while alternative facilities are commissioned in order to service the remaining LOM. SRK designed and provided partial supervision of the construction of this facility.

 

NMP TSF is composed of Wall 17 to RL 135 m with three additional minor compacted fill embankments (Walls 16, 18, and 19) required to be built to RL 135 m in saddles to enclose the site. A layout of the NMP site is presented in Figure 18-6.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 18-17
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 18-18
 www.rpacan.com

 

 

Integrated WPP1 and NMP TSF

The WPP1 and NMP facilities were raised to integrate them into a single facility, the corresponding embankments crests were initially at RL 135 m and RL 130 m, respectively. These embankments were downstream, raised using a combination of rockfill and lateritic borrow material to RL 137 m, which allowed to raise the tailings level to a maximum elevation of RL 136 m. The spillway for the facility was relocated to Wall 16, as shown in Figure 18-7. The integrated facility was designed by SRK.

 

The NMP TSF, initially designed to be built at the elevation RL 135 m, but immediately at the beginning of this construction, the project was revised, raising it to RL 137 m, as well as the walls of the WPP1 dam, unifying it in an integrated reservoir with a capacity of 14 Mm3. The design of the walls of the WPP1 dam (D11, D12 and D13), to integrate into the reservoir of the NMP dam, were reviewed by the SRK designer with the height upstream at 2.0 m high.

 

The NMP TSF, integrated in the RL 137 m, consists of the construction of dikes 16, 17, 18, and 19, by the elevation of 7 m of dikes 2 and 3 (Tap-D TSF); and the elevation of 2 m of dikes 11, 12, 13 (WPP1 TSF) (see Figure 18-7).

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 18-19
 www.rpacan.com

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 18-20
 www.rpacan.com

 

 

Extended Tailings Storage Capacity

The current built TSF capacity is enough to store tailings up to September 2020. Additional tailings storage capacity is planned by commissioning two new facilities, East Dam, East Dam extension NW and WPP2, which would cover the tailings storage demand up to September 2025.

 

Great Panther is planning to first commission East Dam, while working on the development of the larger WPP2 facility. Figure 18-8 presents the proposed TSF expansion.

 

East Dam TSF

The East Dam TSF is composed of Walls 21 and 22 to a crest elevation of RL 137 m. Wall 22 will be constructed as a compacted low permeability homogeneous embankment. Wall 21 is a rockfill embankment with compacted low permeability material in front. A typical cross section of the planned walls is presented in Figure 18-9.

 

East TSF will be bounded by two dikes (D21 and D22), ridges at elevation El. 137.00 m and 2 existing dikes (D12 and D19) that have their crests also at elevation El. 137,00 m, and an overflow at RL 135 m. The East TSF D21 and D22 embankments are under construction and are currently (as of February 2020) at elevation RL 124 m.

 

The construction of the East TSF will be completed in December 2020, with a storage capacity of 4.93 Mm³ and 16 months of operational life. It is scheduled to start operations in July 2020 (Phase 1 with RL 124 m).

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 18-21
 www.rpacan.com

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 18-22
 www.rpacan.com

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 18-23
 www.rpacan.com

 

 

East - Extension NW TSF

East - Extension NW TSF has a conceptual level project completed by GeoHydroTech Engenharia S/S (GeoHydroTech, 2019). It will have a storage capacity of 2.94 Mm³, with its reservoir bounded by three dikes (23, 24, and 21). Dikes 23 and 24 will be built with the crest at an elevation of 125 m and the dike 21 under construction (East dam) with the crest at an elevation of 137 m. Cross sections through these dams are shown in Figures 18-10 to 18-12.

 

The geometric characteristics of the East - Extension NW dam project are shown in Table 18-2.

 

Table 18-2 Geometric Characteristics of the East Extension NW TSF

Great Panther Mining Limited - Tucano Gold Mine

 

Characteristics Units Dike 23 Dike 24
Crest Elevation m 125.0 125.0
Crest Length m 10.0 6.0
Maximum Height m 27.0 9.0
Upstream Slope - 1V:2.5H 1V:2H
Downstream Slope - 1V:2H 1V:2H
Height Between Downstream Berms m 10.0 -
Width of Downstream Berms m 4.0 -
Volume of Material m3 250,870.56 7,155.02
Total Area of Reservoir M2 157,451.46*
Reservoir Capacity m3 2,944,968.405*

 

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 18-24
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 18-25
 www.rpacan.com

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 18-26
 www.rpacan.com

 

 

WPP2 TSF

The WPP2 TSF is a valley-type impoundment that was designed to be developed in two phases, WPP1 (approximately 35 Ha) and WPP2 (approximately 167 Ha), located to the east and west of the valley, respectively. WPP1 has been constructed and is currently active. SRK has designed this facility to a detailed level.

 

In total, nine earth embankments (Wall 1 to Wall 9) were designed to isolate the WPP2 catchment and limit the spread of the tailings. A downstream drainage and seepage collection system for long-term seepage control was considered for Wall 1 to Wall 8. Wall 9 is a temporary structure that allows construction of WPP2 to be staged, if required. Figure 18-12 presents a layout of WPP1 and WPP2 TSF.

 

The storage capacity obtained after construction of the WPP2 is 23.7 Mm3, or 28.0 Mt. This TSF adds approximately seven years of operational TSF capacity.

 

Permitting of the TSF

Operation of TSF in Brazil requires a licence to operate issued by the Instituto de Meio Ambiente and Regulacion Territorial, and a deforestation authorization (ASV) to implement the construction of the facilities.

 

The current operating TSF have been granted licence to operate (Liçença de Operaçao 0223/2015) from November 2015 to November 2021 (six years).

 

The integrated NMP and WPP1 has been permitted via Oficio 868/2017 by the Insitituto de Meio Ambiente and Regulacion Territorial and within the same operational licence.

 

Further IMAP licensing and ASV was issued to permit construction of Barragem Leste.

 

Construction and operation of the WPP2 TSF requires a renewal of the current ASV. This area was divided into 2 ASVs, one of 70 ha which is valid until November 9, 2020 in annex and another of 140 ha which is awaiting clearance by the Environmental Agency (with expectations before mid 2020).

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 18-27
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 18-28
 www.rpacan.com

 

 

Conclusions

There are three TSF in operation at the Tucano Gold Mine, these are Tap D, NMP, and WPP1. The remaining storage capacity built for tailings is 1,879 Mm3, which covers storage for eight months (from December 2019 to June 2020). These facilities were designed and audited by SRK from 2014 to 2019.

 

Additional storage capacity should be implemented through the construction of three new TSFs, East Dam, East Dam - Extension NW and WPP2. These two facilities would provide 4.93 Mm3, 2.94 Mm³ and 23.7 Mm3 of tailings storage, respectively.

 

The East dam is designed and audited by GeoHydroTec. This designer is also developing a new expansion project which is the NW dam, with a storage capacity of 2.94 Mm³, with a reservoir bounded by three dikes (23, 24, and 21) and dikes 23 and 24 will be built with the crest on El. 125 m and dike 21 under construction with the crest on El. 137 m.

 

With these three future dams, there is sufficient tailings deposition capacity until 2027 to support an annual production of 3.9 Mtpa.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 18-29
 www.rpacan.com

19 Market Studies and Contracts

Markets

Gold output from Tucano is in the form of doré bars containing approximately 76% gold and 15% silver, the remainder being copper, iron, and other minor metals. Silver credits are received from the refiner.

 

Approximately 70% of the doré is shipped to Asahi Refining Canada (Asahi) in Brampton, Canada and 30% to Metalor Technologies SA (Metalor) in Neuchâtel, Switzerland. The current refining contract with Asahi is valid until the end of December 2020. The refining contract with Metalor is managed through Samsung C&T U.K and is valid until the end of December 2021.

 

Brink´S - Segurança e Transporte de Valores Ltda (Brinks) is the designated company to transport the doré from Tucano to the refining facilities. The title change for each shipment occurs typically at the Brampton refinery with Asahi, and Sao Paulo airport for Samsung (Metalor). Based on actual contract agreements, the breakdown of costs is set out below:

Refinery charge $0.53/oz Au ($0.50/oz doré).
Transport, handling, and insurance $22.00/oz Au.
Total $22.50/oz Au.

 

The costs above are subject to some variation depending on the number of ounces per shipment, however, they are representative of the average cost.

 

The refining process and sampling is supervised by an independent service provider, which includes the analysis of samples from the service provider’s certified laboratory, to ensure quality standards and accuracy of information are met and maintained consistently.

 

Penalties are applied in the refining contract for any impurities, however, these are rare occurrences and the penalties are not excessive. The main impact comes from the delay in final payments due to higher sample analysis turnaround time, as a result of a higher number of samples required from the special melt shop.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 19-1
 www.rpacan.com

 

 

The market for gold doré is well established. Market predictions and discussions for gold are beyond the scope of this document. The impacts of gold price volatility on Tucano plan and process operation are well understood.

 

Contracts

As of March 15, 2020, the main contractors involved with the mine are:

Mining load and haul: U&M Mineração e Construção S.A..
Mining Additional Equipment Support:- F.J dos Santos Service EPP (rockbreaker).
RC Drilling: Geosedna Perfurações Especiais S.A.
Fuel supply: Ipiranga Produtos de Petróleo S.A.
Power Generators: Aggreko Energia Locação de Geradores Ltda.
Contract security staff: Segurpro Vigilancia Patrimonial S.A.
Catering: JC Refeições Amapari Ltda.
Offsite Laboratory: SGS Geosol Laboratórios Ltda
Contract personnel transport: Costa Lima e Souza Empreendimentos Ltda & Raimundo Palmerin de Souza EPP
Refining: Asahi and Metalor

 

The various contracts were awarded following a competitive bidding process, prices are within the industry range and comparable to other operations in Brazil.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 19-2
 www.rpacan.com

20 Environmental Studies, Permitting, and Social or Community Impact

Tucano is an active mining operation located in the dense tropical rain forest of Amapá State, Brazil, consisting of open pit operations, crushing, milling, and CIL processing that has a direct impact on the environment and the ecosystem of the region. The predominant anticipated environmental impacts are on biological resources, air quality, noise and vibration, archaeology, hydrology (ground and surface water), and community stakeholders.

 

Project Permitting

All licences required for the operation of Tucano and mill and processing plant have been obtained or applications for renewals have been filed. The main licences for Tucano and their statuses are listed in Table 20-1. Figure 20-1 is a location map showing the field monitoring points.

 


Table 20-1   Main Licences and Status
Great Panther Mining Limited - Tucano Gold Mine

 

Licence Status Activity Process Number Issue Date Expire Date
Water permit In process Water intake 4001.181/2011 26/09/2018 22/01/2019
Operation Licence Approved

Open pit mining and

gold ore processing

320274/2004 08/11/2011 09/11/2021

 

A complete environmental study, permitting, and social or community impact assessment was completed by SRK Consultores do Brasil Ltda (SRK Brazil) in 2011 to satisfy the State Secretariat of Environment, Amapá (SEMA) requirements for obtaining a operating licence for a SAG Mill/CIL processing plant.

 

In 2011, SRK Brazil also produced an Environmental Control Plan (PCA) to implement environmental and social controls. The PCA covered the environmental aspects of mining, monitoring and management plans, and guidance on implementing various programs in the local community.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 20-1
 www.rpacan.com

 

 

In 2018, Mr. Batelochi, was requested by AMC to assist in the preparation of Section 20 of the NI 43-101 report 2018 by AMC (AMC, 2018) . Mr. Batelochi conducted a peer review on the PCA routine procedures, specifically on the monitoring of water management, as William Creek passes through Tucano area, flora, fauna, and the development of the native seedling nursery.

 

Air and noise monitoring is comprised of mobile equipment that collects data in compliance with local legal requirements and is performed by an independent company: “Análise Química Mineral, Ambiental e Industrial Mineral Ltda”. During monitoring, data collection was conducted in the areas of the administrative offices, geology laboratory, and carpentry workshop.

 

Flora and fauna monitoring was not validated, however the activities of the field team, an independent company “MRW Ambiental Ltda”, were observed.

 

Tucano has been active engaging with the local communities to create and maintain mutually beneficial relationships founded on understanding and optimizing the benefits Tucano can have on local development. Tucano’s community relations personnel implements wide stakeholder engagement and social investment programs that focus on three main areas: socio-economic development, public health and safety, and education. Some recent programs include:

Family Farming: Striving to improve the quality of agricultural products and skills in rural communities.
Education: Supporting local schools to strengthen access to quality education and complement formal education for children and youth in the region.
Entrepreneurship: Focusing on optimizing opportunities for economic diversification of the region's residents,
Emergency Preparedness Training: Prioritizing the safety of the local communities in Tucano’s areas of influence, seeking to improve community preparedness and emergency prevention initiatives.

 

Groundwater and Surface Water Monitoring

Groundwater and surface water monitoring is performed through daily field checks of monitoring activities and sample collection for chemical analysis at Great Panther facilities. Monthly, quarterly, and semi annual sample collections are performed, with samples sent to certified external laboratories, to satisfy all regulatory requirements.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 20-2
 www.rpacan.com

 

 

During the field visit of M. Batelochi, eight monitoring points were visited as shown in Figure 20-1.

 

The first monitoring point was a solids containment dam at Urucum North pit. It was visually verified that the dam efficiently traps the solids upstream, with clean and clarified water flowing downstream. The remaining monitoring points visited represented piezometers at the pit, tailings dam, and industrial area in compliance with approved environmental plans.

 

The surface water monitoring points visited were selected downstream of the Tap pit complex to check the quality of water returning to the environment. The QP visually checked that the water appeared clean with low turbidity and normal temperature, about 25°C.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 20-3
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 20-4
 www.rpacan.com

 

Fauna and Flora

Tucano flora is typical of an Amazon biome, identified as an area of dense rain forest. The vast biodiversity existing in this Amazonian ecosystem is favoured by the high structural complexity of the environment, with great vertical stratification, diversity of niches and microhabitats, providing a great number of species of flora and fauna. The Tucano area is not recognized as a priority for conservation; however, it should be noted that Tucano is surrounded by areas of conservational interest. To the east and west of Tucano is the Amapá State Forest, along the northern limits is the National Forest of Amapá, and to the southern extent is the priority area for conservation of biodiversity denominated Pedra Branca. This area has a biological importance rating of Very High, due to the presence of certain sensitive areas in the ecosystem that include:

Preservation of species of economic importance.
Maintenance of animal species (spider monkey).
Wildlife Maintenance (MMA).

 

Flora

Vegetation in the Tucano area is well conserved, with reduced stretches in regeneration corresponding to the areas of old gold panning sites. In the regional analysis of Tucano, a secondary vegetation strip is observed to correspond to the headquarters of the municipalities of Serra do Navio and Pedra Branca do Amapari, which creates a geographic barrier to the flow of fauna throughout the western area of Tucano.

 

The Great Panther flora conservation program is the case of germplasm collection in which the collector operates in areas under anthropic impact (Walter & Cavalcanti, 2005). In Brazilian Legislative Decree No. 02 of 08/02/94, genetic resources are defined as “genetic material of real or potential value for human being”, and genetic material refers to all material of plant, animal, or microbial origin, or other, containing functional units of heredity. Therefore, genetic resources represent a small share of biological resources, which in turn are components of biodiversity.

 

Based on these definitions, Tucano has been involved with biodiversity conservation working primarily at a community and ecosystem level, while in the conservation of genetic resources, research is conducted at a species level.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 20-5
 www.rpacan.com

 

 

The suppression of primary dense rain forest vegetation contributes to the reduction of the genetic variability of locally occurring populations of the species. This program uses the premise that the populations and or species affected by the anthropization contain genotypes not found in the remaining populations or elsewhere in their distribution areas, so that there will be loss of genetic variability (Walter & Cavalcanti, 2005.

 

The preservation of the germplasm is based on information constructed with the data of the floristic and phytosociological inventory already carried out, and the evaluation of the biological value of the species, germplasm recovery, and conservation of plant genetic resources. Rehabilitation is completed through the implementation of the re-vegetation sub-program on degraded areas or of future rehabilitation with planting or re-seeding, as well as the provision of genetic material for rehabilitation of the Tucano area.

 

Fauna

The fauna associated with the surroundings of Tucano is diverse and presents typical and endemic elements of dense ombrophilous forest, as well as species of conservation interest such as the Harpy Eagle (Harpia harpyja), Giant Anteater (Myrmecophaga tridactyla), and Jaguar (Panthera onca).

 

The Great Panther fauna conservation program is based on the Normative Instruction (NI) 146/2007 of Brazilian Environmental Agency (IBAMA). The NI serves as a guide instrument composed of procedures and regulations of field and laboratory activities that undertake studies on the fauna of regions under the influence of anthropization. The NI provides accurate data to detect adverse effects and facilitate action to protect the environment.

 

The Great Panther fauna monitoring program has provided to the stakeholders, governmental agencies, and scientific community the composition and structure of faunal communities occurring in the region of Tucano, and the means to evaluate these populations in relation to the future activities of Great Panther.

 

In summary, the monitoring program consists of:

Logging the occurrences of species of mammals, amphibians, reptiles, birds, and fish on extended areas of Tucano’s influence.
Obtaining data on the composition, wealth, and abundance of communities.
Detection and evaluation of the interferences on faunistic communities.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 20-6
 www.rpacan.com

 

 

Development and continuous improvement of controls and management to mitigate impacts on the faunal communities.

 

This continuous faunal monitoring has been carried out by MRW Ambiental, an independent consultancy company, which has been reporting the behaviour of the fauna in the seasons of intense rains and drier periods, periodically, to the legislated governmental agency.

 

Threatened and Special Status Species

In order to reassess the conservation status of the fauna described for Tucano, the list of endangered species contained in Article L. 411-1 of the Brazil Environmental Code (FR197/2010) strictly protects wild species of plants and animals listed by Ministerial Order. These species cannot be captured, transported, intentionally disturbed, or commercially exploited. These prohibitions can extend to the destruction, degradation, and alteration of the habitats of these protected species. A total of 110 nationally protected species were recorded at Tucano. Of these protected species, 100 were bird species, including three species with protected habitat, seven were mammalian species, and three were plant species.

 

Tucano also hosts five new plant species and seven other plants of interest (rare or endemic), as well as two rare and endemic fish species, present in first and second order creeks.

 

Air Quality

Control of air quality in Amapá State is managed by Brazilian laws (CONAMA No. 08/90) establishing national emission limits for external combustion power up to 70 MW, Ordinance MINTER-100/80, which provides for the emission of smoke by diesel-powered vehicles, CONAMA No 01/90 and 03/90, ABNT/NBR 10151, CONAMA No. 436/2011-NBR 9547, 12019, and NBR 12827. This set of regulations manages the emission control of gaseous effluents, airborne particulates, noise, and vibration. There is systematic monitoring of concentrations of pollutants to be discharged into the environment (atmosphere) and the degree of risk caused in the environment is minimized by keeping concentrations below the legal limits. Great Panther periodically submits the monitoring reports to the governmental agency and is regularly audited.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 20-7
 www.rpacan.com

 

 

The air quality for Tucano is monitored through the measurement of gaseous effluents from the exhaust discharge of the generator sets of the Thermoelectric Plant (UTE), smoke indices from the diesel-powered heavy equipment and through control of total suspended particles. These effluents have come from the UTE, the processing plant, the administrative area, and the explosives magazine.

 

The main air pollutants emitted by the UTE are nitrogen oxides composed of nitric oxide (NO), nitrogen dioxide (NO2), and carbon dioxide (CO2). In smaller amounts, carbon monoxide (CO), hydrocarbons, smoke, and sulphur dioxide (SO2) are also expelled.

 

In a sample analysis of reports submitted to government agencies, the concentrations of NO, NO2, CO, CO2, O2, and SO2 show satisfactory indices below the reference limits of the equipment. Suspended total particle concentrations have higher concentration indices for periods of low rainfall, but are well below the acceptable maximum limit.

 

Smoke ratings on off-road mobile equipment and light vehicles have satisfactory rates of 20% or less (RINGELMANN comparative scale No.1).

 

Noise Quality and Vibrations

The main noise and vibration issues pertain to haulage vehicles, blasting, and heavy equipment (fixed and mobile):

Vibrations and noise caused by traffic and use of heavy equipment are relatively minor and can be considered negligible.
The crushing system and beneficiation plant generates high noise/vibration levels that have been monitored in order to ensure that maximum levels acceptable within the legal limits are not exceeded. Several items of equipment have enclosed, or acoustic barriers installed in order to guarantee the noise levels remain below the limits of the legislation. In addition, periodic and corrective maintenance is conducted to keep noise within the limits set by manufacturers and specific legislation.
Blasting has been limited to a scheduled time and blasting schedules must be pre-defined and marked on visible notices at the entrance to the Tucano areas. Tucano does not have communities in its immediate surroundings and the noise and vibration of blasting is negligible to its closest communities.

 

Noise is routinely monitored in these areas and shows levels below 70 dBA. On site, the compulsory use of individual hearing protection is enforced.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 20-8
 www.rpacan.com

 

Geotechnical

The geotechnical control and monitoring implemented at Tucano consists of designing a set of sediment retention structures and slopes in the pit and surrounding hills inside the Tucano area. Slopes are controlled by the Mine Planning and Mine Operation departments with specific controls developed by specialists in geotechnical engineering and monitoring of soil/rock potential displacement points. Sediments are controlled by collecting water run-off and directing it through surface drainage systems and internal drainage systems (in the case of waste and pits), thus allowing for the reduction of solid material suspension in the water that is carried to existing waterways, primarily William Creek.

 

The main objective of these geotechnical controls is to ensure efficient prevention of erosion and prevent solids in the form of sediments flowing into the environment via waterways and, consequently, to minimize the impact on the surrounding non-anthropized areas.

 

Hydrogeology and Hydrology

Hydrogeology and hydrology are critically related to the equatorial regions, where rainfall levels exceed 2,000 mm per year, and it is the most relevant element of the physical environment that impacts the ecosystem. For this reason, the characterization and constant monitoring of groundwater, surface water, and rainwater is essential to minimize the impact of Tucano’s operations.

 

Tucano implemented monitoring of the hydrogeology and hydrology system in 1999, where surface sampling points and piezometers were geo-referenced and flagged. Routine sampling has collected quality base data (CONAMA 20/86 standard), with which current water quality sampling is compared (CONAMA 357/05). Sampling includes physical parameters of acidity, conductivity, temperature, DO, and turbidity. Samples are sent to SGS Laboratories for metal content (anions and solids levels) analysis.

 

In 2005, before beginning operations, the hydrogeology a hydrology monitoring system was extended to cover the area considered under the FS including the waste dump, tailings, industrial plant, and buildings.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 20-9
 www.rpacan.com

 

 

Currently, the underground and surface water-monitoring system consists of 29 points:

11 points of piezometers.
11 surface water points (river).
seven monitoring points in the maintenance area and Gas Station to check the separation the water and oil in the waste boxes.

 

Due to adjustments in the Tucano infrastructure as a result of the dynamics of the operation, several piezometers and water surface points were abandoned, and others were installed in the area of coverage.

 

In compliance with the CONAMA (Brazilian Environment Council) regulations: 357/2005, 396/2008, and 430/2011 that define the minimum standards quality of surface, underground and effluent water according to the predominant uses. These standards must be maintained, in order to respect the water distribution and the needs of the entire local community. The results have been submitted to SEMA that indicate the results of the quality of water and drainages due to Great Panther’s activities.

 

Cultural and Archaeological Resources

The archaeological studies carried out by Great Panther at Tucano are in full compliance with a series of the Brazilian regulations, which are as follows:

regulations articles 20, 23, 215, and 216 of the Federal Constitution; Laws No 3.924, 26 July 1961;
Ordinance SPHAN No 07, 10 December 1988;
Ordinance IPHAN No 230, 17 December 2002;
Normative Instruction IPHAN, No 001, 25 March 2015.

 

Regional Archaeological Context

Amapá State has known archaeological evidences dating to the sixteenth century, from scientific expeditions by naturalists, travellers, and ethnologists. There are contributions on archaeological ceramics from noted individuals such as Crevaux, Coudreau, P Curt Nimuendajú, and Emilio Goeldi.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 20-10
 www.rpacan.com

 

 

In the Tucano area, specifically in the municipalities of Pedra Branca do Amapari, Serra do Navio, and Porto Grande, there are 68 identified archaeological sites, most of them associated with historical and pre-colonial sites.

 

Archaeological Studies

Archaeological research was initiated in 2005 by Nunes Filho (2007 and 2009) and was carried out in accordance with the Archaeological Program defined in the environmental impact study, approved by SEMA.

 

During 2006 and 2007, several surveying, prospecting (with sample collection of artefacts), elaboration of surface diagnostics (for preliminary cultural characterization of each archaeological site), archaeological excavation, and laboratory studies were carried out, with the main objective of training a local team in archaeology and patrimonial education.

 

All archaeological material collected during these activities was duly packed and transported to the Archaeological Laboratory of the Archaeological Studies and Research Centre of Amapá-Cepap (UNIFAP), where they underwent the processes of cleaning, cataloguing, analysis, and restoration.

 

The result of the archaeological studies completed during 2006 and 2007 identified 11 archaeological sites, all of them prehistoric, among which three were excavated and studied. In 2008, the archaeological survey identified seven archaeological sites, once again all prehistoric, these were excavated and studied, and the material, as in previous years, was duly sent to UNIFAP. Also, in 2008, five carbon samples were sent to the Beta laboratory, Miami Florida, United States for carbon dating. In 2009, in the municipality of Pedra Branca do Amapari, four other archaeological sites were identified, with the excavation of three sites and surface collection of one site. Currently, this area belongs to Zamin Resources Ltd. The results of the archaeological studies from 2005 to 2009 subsidized the Beadell Operation Licensing for the current operation at Tucano.

 

After 2012, when operations restarted, archaeological studies became part of the routine activities of the company concurrently conducting exploration activities while monitoring, mapping, and identifying archaeological sites, and restoring artefacts such as those shown in Figure 20-2.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 20-11
 www.rpacan.com

 

 

Figure 20-2 Ceramics Fragments Found in “Sitio 1” of Mutum Area

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 20-12
 www.rpacan.com

 

Social or Community Requirements

An area of approximately 4,000 km2 is socially affected by Tucano and partially includes the municipalities of Serra do Navio and Pedra Branca do Amapari (the population is distributed at the town and in small communities).

 

The municipality of Pedra Branca do Amapari, based on the last census of 2010 has a population of 10,773 inhabitants with a population density of 0.50 inhabitants/km². The entire population is considered a stakeholder of Tucano within the scope activities and a total of 21 communities are dispersed along the unpaved highway BR-210.

 

The municipality of Serra do Navio, has a population of 5,111 inhabitants with a population density of 0.66 inhabitants/km², where practically the entire population is included within Tucano's coverage area (both in the town and the ten small communities surrounding the western part of Tucano).

 

Figure 20-3 shows the communities affected by Tucano (Stakeholders).

 

Tucano, as part of the requirements of its Operation Licence, annually contributes capital to the Social and Environmental Compensation Funds of the local municipalities of Pedra Branca and Serra do Navio. A council formed by representatives of the communities, City Hall, City Council, and Great Panther, reviews and analyzes the programs that will be executed under these agreements in their respective communities. Initiatives are implemented by working collaboratively with the following stakeholders:

State Environmental Resources Fund (FERMA).
Community Development Fund (FDC).
Social Development Fund (SDS).

 

In addition to these social and environmental commitments, Tucano implements wide stakeholder engagement and social investment programs focused in three main areas: socio-economic development, public health and safety, and education.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 20-13
 www.rpacan.com

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 20-14
 www.rpacan.com

 

Mine Closure

In December 2019 a specialized company, Mineral Engenharia e Meio Ambiente Ltda (MEMA) updated the Tucano closure plan and provided a cost estimate closure plan for the mining and processing operations at Tucano.

 

The MEMA Asset Retirement Obligation Report (MEMA, 2019) describes the costs associated with closing Tucano considering the current situation of the pits, waste dumps and tailings dam. These costs are to be updated as mining progresses.

 

The document complies with NBR 13030 norms regarding rehabilitation and vegetation of areas degraded by mining activities using recovery and revegetation techniques described in IBAMA (Brazilian Institute of the Environment and Renewable Natural Resources and Mining Regulatory Norms (MRN), 19, 20 and 21).

 

The total estimated closure costs for Tucano are summarized in Table 20-2.

 

Table 20-2 Closure Plan Total Cost

Great Panther Mining Limited - Tucano Gold Mine

 

Item Total (R$ 000) Total (US$ 000)
Management 2,543.40 669.32
Dismantling and Demolition 30,315.01 7,977.63
Pit Closure 3,203.52 843.03
Waste Piles Recovery 12,105.75 3,185.72
Dams Recovery 15,825.06 4,164.49
Accesses Recovery 1,630.45 429.06
Industrial and Civil Areas Recovery 2,608.49 686.45
Old Mining Site and Ore Pile Recovery 3,253.96 856.31
Anthropic Area Recovery 5,224.61 1,374.90
Loan Areas Recovery 1,196.60 314.89
Environmental Monitoring 1,572.80 413.89
Community Relations Program 50.00 13.16
Total 79,529.66 20,928.86

 

Notes:

1.US$/R$ exchange rate of 1:3.8
2.The following revenues are estimated to be obtained in the deactivation phase.
3.Sale of scrap metal is expected to generate R$2,439,008 (US$641,844)

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 20-15
 www.rpacan.com

21 Capital and Operating Costs

Capital Costs

The Mine capital cost for the LOM totals $59.8 million. The open pit capital is $9.5 million, and the underground capital is $50.3 million. The LOM capital costs are summarized in Table 21-1.

 


Table 21-1   Project Capital Cost
Great Panther Mining Limited - Tucano Gold Mine

 

Area Unit Total Y0 Y1 Y2 Y3 Y4 Y5 Y6 Y7
Tailings Dam Expansions US$ 000 5,636 4,321 1,316 - - - - - -
New Primary Crusher US$ 000 672 672 - - - - - - -
Contractor Shop Improvements US$ 000 421 421 - - - - - - -
Environmental improvements US$ 000 619 619 - - - - - - -
Power Line US$ 000 605 605 - - - - - - -
Plant Improvements US$ 000 661 661 - - - - - - -
Fire Safety System Retrofit US$ 000 342 342 - - - - - - -
Others US$ 000 329 329 - - - - - - -
Closure Activities US$ 000 197 20 178 - - - - - -
Total Open Pit Capital Cost US$ 000 9,483 7,989 1,493 - - - - - -
UG Infrastructure US$ 000 25,040 - 9,810 7,490 4,360 2,940 440 - -
Jumbo Development US$ 000 25,290 - 1,990 6,280 6,280 6,270 4,280 190 -
Total Underground Capital Cost US$ 000 50,330 - 11,800 13,770 10,640 9,210 4,720 190 -
Total US$ 000 59,813 7,989 13,293 13,770 10,640 9,210 4,720 190 -

 

Open Pit Capital Cost

The total open pit capital cost estimated for the Mine over the LOM totals US$9.5 million as summarized in Table 21-1. The cost includes tailings dam expansion, new primary crusher, contractor shop improvements, power line, plant improvements, environmental improvements, closure cost, fire safety system, and others.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 21-1
 www.rpacan.com

 

Underground Capital Cost

The underground capital costs are summarized in Table 21-2.

 


Table 21-2   Underground Capital Cost
Great Panther Mining Limited - Tucano Gold Mine

 

Area Unit Total Y1 Y2 Y3 Y4 Y5 Y6 Y7
UG Lateral Development US$ 000 25,290 1,990 6,280 6,280 6,270 4,280 190 -
Egress Ladderway US$ 000 490 - 160 220 110 - - -
High/Medium voltage switch US$ 000 570 570 - - - - - -
Power Supply and Distribution US$ 000 4,730 510 1,550 1,580 1,040 50 - -
Mine Dewatering & Water Supply US$ 000 4,080 460 1,330 1,360 890 40 - -
Compressed Air - Portable Compressors US$ 000 300 200 100 - - - - -
Refuge Chambers US$ 000 320 210 110 - - - - -
Fire Detection & Suppression US$ 000 260 180 80 - - - - -
Leaky Feeder Communications System US$ 000 280 120 60 60 40 - - -
Mine Rescue Equipment US$ 000 200 150 50 - - - - -
Auxiliary Ventilation Fans & Regulators US$ 000 480 130 130 130 90 - - -
UG Workshops - UG Fit out US$ 000 300 200 100 - - - - -
UG Infrastructure US$ 000 12,010 2,730 3,670 3,350 2,170 90 - -
Portal Preparation US$ 000 300 300 - - - - - -

Surface Exhaust Fan

(2 x 560 kW parallel fans)

US$ 000 2,720 1,410 1,310 - - - - -
Change Rooms/Lamp room/Lamps +SRs US$ 000 900 260 160 160 160 160 - -
Underground Mining Offices US$ 000 700 220 120 120 120 120 - -
Surface Workshop US$ 000 400 400 - - - - - -
Water Supply (PRV, tanks) US$ 000 340 340 - - - - - -
Fuel Storage and Bowser US$ 000 250 250 - - - - - -
Surveying and Eng. Equipment US$ 000 300 300 - - - - - -
First Fills US$ 000 1,100 1,100 - - - - - -
Raiseboring US$ 000 2,180 1,200 980 - - - - -
Infrastructure Contingency US$ 000 3,840 1,300 1,250 730 490 70 - -
Surface Infrastructure US$ 000 13,030 7,080 3,820 1,010 770 350 - -
UG Capital Cost, Total US$ 000 50,330 11,800 13,770 10,640 9,210 4,720 190 -

 

Note:

1.Numbers may not add due to rounding.

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 21-2
 www.rpacan.com

 

 

Underground Lateral Development Capital Costs

Capital lateral development is expected to cost approximately $25.3 million over the LOM. This cost excludes material handling costs, power, and diesel costs which have been allocated to operating costs.

 

Underground Vertical Development Capital Costs

Capital raiseboring is expected to cost approximately $2.18 million during the first 18 months of the Project. Additional longhole raising for both the airway extensions and emergency egress has been costed as an operating cost (apart from purchasing of the emergency ladderway at a cost of $0.50 million).

 

Underground Mobile Equipment Capital Costs

The Project is assumed to use a contractor for all development and production throughout the LOM. The equipment costs are included in the contractor’s development and production mining rates. The estimate for the contractor provided equipment includes the following (based on maximum requirements):

Longhole production drill (1)
Jumbos - double-boom (6)
10 t LHDs (5)
Articulated trucks - 32.5 t (5)
Cable bolters and shotcrete machines (4)
Ancillary equipment

 

Underground Infrastructure Capital Costs

The underground infrastructure capital cost estimate is $12.00 million as summarized in Table 21-2. Costs are based on supplier quotations and unit rates from past experience with similar projects. The underground infrastructure costs largely consist of electrical reticulation, ventilation, and dewatering system costs.

 

Surface Infrastructure Capital Costs

Table 21-2 presents a breakdown of the direct capital costs estimated for the surface infrastructure required to support underground mining.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 21-3
 www.rpacan.com

 

 

Exclusions from the Underground Cost Estimate

The following costs have not been included in the underground capital cost estimate:

Mine closure costs (to be captured as part of open pit costs).
Mill modification costs.
Surface road costs to the Urucum North Underground Mine site.
Additional explosives magazine facilities.
Additional stores / warehousing facilities.

 

Existing facilities and infrastructure such as the surface road, explosives magazine, and stores/warehouse can be used.

 

Indirect Capital Costs

Indirect costs defined as those pertaining to engineering, procurement, and construction management (EPCM), the costs associated with servicing and maintaining the Project during the construction period, and operating costs incurred prior to first concentrate production. No Owners’ costs or EPCM have been considered in the cost estimate.

 

Capital Contingency

Capital contingency totals $3.90 million and average approximately 10% of the direct capital cost.

 

Operating Costs

Operating cost estimates in this section include on-site and off-site costs. On-site operating costs comprise the mining cost, process plant operating and maintenance cost and G&A costs. Off-site operating costs include doré bullion transport and refining charges, and the federal and state royalties and other royalty agreements in relation to mineral product sales from the Tucano Gold Mine. The operating cost estimate for the Tucano Project is expressed in Q4 2019 R$.

 

The mine operating cost history is summarized in Table 21-3. All the costs reflect open pit mining.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 21-4
 www.rpacan.com

 

 

Table 21-3   Operating Cost 2016 to 2019
Great Panther Mining Limited - Tucano Gold Mine
 
  Mine  Mine  Plant G&A  Total
   R$/t mined  R$/t ore  R$/t ore  R$/t ore  R$/t ore
2016 14.97 81.58 51.31 11.53 150.82
2017 14.50 82.93 47.15 11.71 146.74
2018 13.76 81.14 52.52 13.12 150.26
2019 12.91 95.01 74.01 14.37 186.5

 

The LOM pit operating costs are summarized in Table 21-4. Pit operating costs were determined quarterly for the LOM. The costs are based on material quantities and unit costs supplied from existing operations comprised of actual 2019 operating costs, projected operating costs, and the current mining contracted rates. The operating costs do not include Great Panther corporate G&A costs.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 21-5
 www.rpacan.com

 

Table 21-4   LOM Open Pit Operating Cost
Great Panther Mining Limited - Tucano Gold Mine

 

    LOM 2019Q1 2020Q1 2020Q2 2020Q3 2020Q4 2021Q1 2021Q2 2021Q3 2021Q4
Mining (OP) R$/t moved 13.35 13.64 13.23 12.90 12.06 12.10 14.80 13.75 15.56 16.02
Mining (OP) R$/t feed 93.84 104.72 94.96 98.66 100.65 100.94 113.05 101.09 59.93 25.55
Processing US$/t feed 62.77 66.42 68.87 66.04 54.84 53.01 57.75 64.06 69.30 69.66
G&A US$/t feed 23.38 23.38 23.38 23.38 23.38 23.38 23.38 23.38 23.38 23.38
Total US$/t feed 179.99 193.19 187.21 188.08 178.87 177.33 194.19 188.53 152.61 118.59
                       
Mining (OP) R$000  652,664 89,451 76,800 81,106 86,721 86,355 91,432 83,109 51,633 6,617
Processing R$000 436,530 56,824 55,697 54,294 47,252 45,347 46,707 52,662 59,708 18,039
G&A R$000 162,605 20,002 18,909 19,221 20,144 20,002 18,909 19,221 20,144 6,054
Total Operating Cost R$000 1,251,800 165,276 151,406 154,558 154,117 151,704 157,047 154,992 131,485 30,710

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 21-6
 www.rpacan.com

 

Open Pit Mining Cost

The open pit mining cost is sourced from the actual 2019 operating costs and the unit mining costs defined in the mining contracts. The pit on-site operating cost is based on operating the equipment, the labour associated with operating the mine, the cost for explosives and diesel, as well as pit dewatering, road maintenance, and other activities. Open pit operating costs are summarized in Table 21-4 and average R$13.35/t moved ($3.51/t moved at an R$/US$ exchange rate of 3.8:1). Key mine operating cost parameters include:

Mine operating cost extend from October 1, 2019 to the end of mine life in 2021.
Continuous 24 hour per day mining operation for 365 days per year.
Tucano fixed unit cost of R$7.30/t for oxide ore mining, comprised of unit costs for production drilling, loading, hauling, de-watering, U&M contractor ancillary equipment and extra works, mine geology, and grade control drilling.
Tucano fixed unit cost of R$8.92/t for fresh ore mining, that includes production drilling, blasting, loading, hauling, de-watering, U&M contractor ancillary equipment and extra works, mine geology, and grade control drilling.
Tucano fixed unit cost of R$4.07/t for oxide waste mining that includes production drilling, loading, hauling, de-watering and U&M contractor ancillary equipment and extra works.
Tucano fixed unit cost of R$5.69/t for fresh waste rock mining that includes production drilling, blasting, loading, hauling, de-watering and U&M contractor ancillary equipment and extra works.
U&M contractor fixed mining cost of R$0.91/m3 for pre-split drilling (applicable to fresh rock only).
U&M contractor variable unit mining cost for oxide, transitional, and fresh ore, contingent on the haulage distance, as defined in the mining contract and summarized in Table 21-5.
U&M contractor variable unit mining cost for oxide, transitional and fresh ore, contingent on the haulage distance, as defined in the mining contract and summarized in Table 21-6.
U&M contractor variable ore re-handle cost, contingent on the haulage distance, as defined in the mining contract and summarized in Table 21-7. Swell factor 1.3 is used to convert bank cubic meters to loose cubic metres.
U&M contractor fixed crusher feed cost of R$2.58/t.
Contractor labour costs are included in the unit mining costs.
Owner labour costs are included in Tucano mining and processing costs.
Drilling utilizing 152 mm and 114 mm drills. Drill consumables are covered in U&M contract mining costs.
Blasting waste rock at an explosive powder factor of 0.79 kg/m3 and mineralized rock at a powder factor of 1.26 kg/m3 using 100% emulsion explosives. Explosives supplied under full-service contract with explosives supplier. Explosives prices: R$3.15/kg ANFO; R$4.56/kg emulsion. Accessories are estimated at R$51.72/blasthole. Monthly service charge R$121,600/month.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 21-7
 www.rpacan.com

 

 

Diesel fuel included in mine operating costs at R$3.701/L.
No blasthole assaying costs are included in mine operating costs. Blasthole assaying is done at the process plant laboratory.
Mine operating cost estimates are based on a US$/R$ exchange rate of 1:3.8.
No VAT or import duties are included in mining costs.

 


Table 21-5   U&M Unit Mining Cost - Ore
Great Panther Mining Limited - Tucano Gold Mine

 

Haul Distance

(m)

Oxide Ore

(R$/m3)

Transitional Ore

(R$/m3)

Fresh Ore

(R$/m3)

1000-1500 9.40 17.99 21.45
1500-2000 10.41 19.68 23.14
2000-2500 10.53 19.93 23.37
2500-3000 10.63 21.69 23.45
3000-3500 11.27 21.76 24.55
3500-4000 11.63 22.86 25.14
4000-4500 12.59 23.10 26.63
4500-5000 13.35 23.69 28.19
5000-5500 14.09 24.97 28.70
5500-6000 14.29 25.59 29.05
6000-6500 15.08 25.59 29.05
6500-7000 15.90 25.59 29.05

 



Table 21-6   U&M Unit Mining Cost - Waste Rock
Great Panther Mining Limited - Tucano Gold Mine

 

Haul Distance (m) Oxide Ore (R$/m3) Transitional Ore (R$/m3) Fresh Ore (R$/m3)
1000-1500 10.31 18.80 21.62
1500-2000 11.31 20.49 23.31
2000-2500 11.44 20.74 23.53
2500-3000 11.54 22.51 23.62
3000-3500 12.15 22.56 24.72
3500-4000 12.56 23.66 25.31
4000-4500 13.49 23.90 26.80
4500-5000 14.26 24.50 28.35
5000-5500 14.26 24.50 28.35
5500-6000 14.26 24.50 28.35
6000-6500 14.26 24.50 28.35
6500-7000 14.26 24.50 28.35

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 21-8
 www.rpacan.com

 

 

Table 21-7   U&M Ore Rehandle Cost
Great Panther Mining Limited - Tucano Gold Mine

 

Haul Distance (m) Unit Cost (R$/m3)
1000 10.53
2000 11.91
3000 14.48
4000 16.62
5000 17.12
6000 19.06
7000 21.59

 

Underground Mining Cost

LOM underground total operating costs, by major area, are shown in Table 21-8. Annual operation totals are shown in Table 21-9.

 

Table 21-8 LOM Underground Total Operating Costs by Major Area

Great Panther Mining Limited - Tucano Gold Mine

 

Department

Operating Cost

($M)

Mine 160.7
Surface Handling 2.8
Process plant 39.1
G&A 13.1
Total 161.8

 

Table 21-9 LOM Underground Total Operating Costs by Year

Great Panther Mining Limited - Tucano Gold Mine

 

Year

Operating Cost

($M)

Year 1 2.3
Year 2 22.7
Year 3 30.7
Year 4 36.3
Year 5 29.6
Year 6 31.4
Year 7 8.8
Total 161.8

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 21-9
 www.rpacan.com

 

 

LOM Mining costs are estimated to be $50.00/t of ore milled and total operating costs, inclusive of processing and G&A, are estimated to be $75.80/t of ore milled. The cost breakdown by major area is shown in Table 21-10.

 

Table 21-10 LOM Average Underground Total Operating Costs

Great Panther Mining Limited - Tucano Gold Mine

 

Department

Operating Cost

($/t milled)

Mine 50.00
Surface Handling 1.32
Process plant 18.33
G&A 6.15
Total 75.80

 

Plant Operating Cost

The process plant operating costs are summarized in Table 21-11 by cost type.

 


Table 21-11   Process Plant Operating Cost
Great Panther Mining Limited - Tucano Gold Mine

 

Cost Type Unit Oxide Ore Fresh Ore
Crushing R$/t 2.79 2.79
Grinding R$/t 4.33 10.18
CIL R$/t 12.42 18.28
Power Supply R$/t 19.52 32.13
Reagents R$/t 0.20 0.20
Tailings Disposal R$/t 0.50 0.50
Chemical Preparation R$/t 0.70 0.70
Desorption R$/t 1.53 1.53
Carbon Regeneration R$/t 0.24 0.24
Electrolysis and Fusion R$/t 0.27 0.27
Thickening R$/t 0.12 0.12
Plant Laboratory R$/t 0.06 0.06
Portable Water R$/t 0.22 0.22
Detox R$/t 2.44 2.44
Total R$/t 45.34 69.67
  US$/t 11.93 18.33

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 21-10
 www.rpacan.com

 

 

General & Administrative Cost

The operating costs for the G&A areas were determined and summarized in Table 21-12 by cost areas of mine, plant, general and overheads. The total unit G&A cost was estimated to be R$23.38/t feed. Other G&A operating cost parameters include:

Camp costs (catering, etc.), bussing for local employees, and travel costs for professional staff that commute from either Macapá or other cities in Brazil on a fly-in-fly-out (FIFO) basis included in G&A cost estimates
Tucano maintenance of production equipment is covered in G&A cost estimates
Tucano maintenance of light vehicles and miscellaneous equipment is covered in G&A cost estimates

 

G&A operating cost excludes the costs associated with Great Panther’s Vancouver office (Table 21-13).

 

Table 21-12 General and Administration Cost

Great Panther Mining Limited - Tucano Gold Mine

 

Cost Area Unit Value
Fixed Costs Mine    
Mine Planning R$/t 0.98
Mine Geology R$/t 0.15
Grade Control Drilling R$/t 1.07
Mine Laboratory R$/t 0.37
Mine Management R$/t 1.39
De-watering R$/t 0.57
Production Drilling R$/t 0.10
Blasting R$/t 0.59
Loading R$/t 0.14
Hauling R$/t 0.39
U&M Ancillary Equipment & Extra Work R$/t 0.06
Fixed Costs Mine Total R$/t 5.85
  US$/t 1.54
     
Fixed Costs Plant    
Plant Management R$/t 1.31
Crushing R$/t 0.14
Grinding R$/t 0.22
Desorption R$/t 0.16
Electrolysis and Fusion R$/t 0.06
Reagents R$/t 0.11
CIL R$/t 0.23
Detox R$/t 0.0002
Tailing Disposal R$/t 0.14

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 21-11
 www.rpacan.com

 

 

Cost Area Unit Value
Chemical Preparation R$/t 0.47
Plant Laboratory R$/t 0.03
Water Treatment R$/t 0.00003
Power Supply R$/t 0.01
Plant Ancillary Vehicles R$/t 0.09
Plant Maintenance Management R$/t 0.71
Electrical Maintenance R$/t 1.05
Mechanical Maintenance R$/t 1.44
Fixed Costs Plant Total R$/t 6.16
  US$/t 1.62
     
Fixed Costs G&A    
Administration Manager R$/t 0.32
General Services R$/t 1.37
Security R$/t 1.92
Safety R$/t 0.50
Health R$/t 0.34
Environmental R$/t 1.16
SHE Management R$/t 0.21
Purchasing R$/t 0.53
Warehouse R$/t 0.53
Fixed Costs G&A Total R$/t 6.89
  US$/t 1.81

 

Table 21-13 Head Office Administration Cost

Great Panther Mining Limited - Tucano Gold Mine

 

Cost Type Unit Value
Fixed Costs Overhead    
General Management R$/t 0.69
Legal RJ R$/t 0.75
Human Resources R$/t 0.46
Mine Finance R$/t 0.31
Communities R$/t 0.20
Archaeology R$/t 0.07
Information and Technology R$/t 0.97
Finance Director R$/t 0.52
General Services Rio R$/t 0.11
Treasury R$/t 0.24
Rio Finance R$/t 0.15
Fixed Costs Overhead Total R$/t 4.48
  US$/t 1.18

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 21-12
 www.rpacan.com

 

 

Off-Site Operating Cost

Gold doré is shipped from the site to the refining company. The current transport costs are estimated at $R20.94/oz Au and the refining treatment charges are R$73.99/oz Au.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 21-13
 www.rpacan.com

22 Economic Analysis

This section is not required as Great Panther is a producing issuer, and Tucano is currently in production and there is no material expansion of current production.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 22-1
 www.rpacan.com

23 Adjacent Properties

There are no relevant adjacent properties to Tucano.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 23-1
 www.rpacan.com

24 Other Relevant Data and Information

No additional information or explanation is necessary to make this Technical Report understandable and not misleading.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 24-1
 www.rpacan.com

25 Interpretation and Conclusions

Based on the site visit, discussions with Project personnel, and available information, RPA and Great Panther offer the following conclusions:

 

Geology and Mineral Resources

The gold mineralization at the Urucum and Tap AB deposits is observed to be related to elevated abundances of pyrrhotite that occurs in both stratiform and cross-cutting relationships with the host rocks. The primary host rock has been a BIF, with other host rocks containing lesser quantities of gold.
Digital interpretations of the distribution of the gold mineralization for the Urucum and Tap AB deposits were prepared by RPA using Seequent Limited’s Leapfrog software package. The mineralization wireframes were created using a nominal cut-off grade of 0.5 g/t Au across a minimum width of three metres to align with the cut-off grade and minimum width criteria that are currently being employed by the Mine staff for establishing the ore/waste dig packets at the Urucum deposit.
Review of the resulting contoured grade longitudinal sections for the selected lodes at the Urucum deposit suggests that, in general, the higher gold grades occur as small pockets up to a few tens of metres in size. In places, these higher grade pockets are contained within broader, lower grade zones which locally exhibit shallow northerly plunges. Flat-lying plunges, and steep southerly plunges are also suggested on a more local scale.
The down-plunge limits of many of the higher grade mineralized shoots at Urucum do not appear to be defined by drilling in the wireframes examined.
Examination of the grade distribution for wireframe S03 of the Tap AB deposit reveals that this wireframe has been systematically evaluated by diamond drilling at a spacing of approximately 50 m x 50 m to a depth of approximately 200 m below the current mining surface. The density of drill hole and sample information increases at shallow levels where information from grade control drilling programs is available. The drilling has identified several zones of elevated gold grades. In general, these higher grade zones appear to be oriented along a moderate to steep north plunge. The higher grade zones located immediately below the mining surface in the AB 1 portions of the zone occur as pods approximately 25 m to 50 m in size.
The down-plunge limits of many of the higher grade mineralized shoots within the S03 wireframe of the Tap AB deposit do not appear to be defined by drilling in the wireframes examined.
The 2019 Tucano Mineral Resource estimate resulted in a 51% reduction in Measured and Indicated gold ounces, relative to the previous (June 30, 2017) estimate, after accounting for a 62% reduction in ore tonnage and a 27% increase in gold grades.
The 2019 geological interpretation of the mineralized zones is the most significant factor explaining the reduction in resource tonnage. RPA and Great Panther interpreted mineralized zones as discrete lodes, which in turn were used to constrain the block grade estimates. The 2017 resource model used a geostatistical approach with limited manual interpretation.

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 25-1
 www.rpacan.com

 

 

Mining and Mineral Reserves

The 2019 Mineral Reserve estimate resulted in a 43% reduction in gold ounces compared to the previous (June 30, 2017) estimate as the 51% reduction in ore tonnes is partly offset by a 17% improvement in average gold grades.
The decrease is primarily due to the change in the underlying Mineral Resources, as well as an increase in cut-off grades to reflect current operating parameters.

 

Open Pit Mining

The Mine is a mature open pit mining operation in a steady state of mining production. The operations are sufficiently established to provide the basis of much of the technical and economic inputs required for this study.
Economic analysis confirms the economic viability of the open pit Mineral Reserves at the base gold price of US$1.250/oz.
Pit optimizations were carried out on Measured and Indicated Mineral Resources using a block net value (block value = block revenue - block total operating cost), including allowances for dilution and mining loss, and preliminary estimates for pit OSA.
Individual pit shell selection was made based on a gold price of US$1,250/oz Au for Urucum Central South and Urucum Central North, US$1,350/oz Au for Tap AB 1, Tap AB 3 and Duckhead, US$1,450/oz Au for Urucum North and Urucum East, and US$1,500/oz Au for Urucum South. These pit shells were used to guide the ultimate pit design.
In order to determine if material within the open pit should be sent to the mill for processing or to the waste rock dump, a marginal cut-off grade has been calculated. The marginal cut-off grade, which is referred to as the “Open Pit Discard Cut-off” in the CIM Estimation of Mineral Resource and Mineral Reserves Best Practice Guidelines, differs from the breakeven cut-off-grade since mining costs are excluded from the calculation.  The reason for excluding the mining costs is that material already defined to be within the limits of the open pit must be mined regardless if it is classified as ore or waste in order to access the bench below. 
The mine planning block model is based on the resource model regularized to the minimum practical size dig block (i.e., selective mining unit), that can be selectively excavated by mining equipment currently employed on site. Each block in the regularized model contains the quantities of diluted mineralized tonnes and grades including the tonnages of mining dilution and ore loss, where ore loss (%) = 100% - mining recovery (%). Mining dilution comprises internal dilution inherited during the model regularization and external (contact) dilution resulting from geological/geometric contacts with waste rock.
Geotechnical and pit design parameters are based on data, information, and results from previous geotechnical studies and incorporate the pre-split drilling and controlled blasting. There is a risk that the failure to attain the design pit slopes could result in pit wall instability and the loss of ore at the pit bottom.
The west wall of the Urucum Central South pit underwent slope displacement on October 6, 2019. Since then, the pit has been closed to mining while Great Panther works toward a remediation plan with the assistance of the independent consulting firm Knight Piésold & Co. This pit remains in Mineral Reserves, however, the pit design may be subject to revision once the results of the remediation plan are available.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 25-2
 www.rpacan.com

 

 

All pits have been designed with 4 m operating bench heights. To maximize ore selectivity and minimize dilution, it is expected that ore will be mined on 4 m benches.
The catch-berms in fresh rock are stacked at 24 m intervals (Urucum) and 20 m intervals (other pits). It is believed that it may be possible in some higher elevation areas to mine fresh waste rock on 8 m or 12 m high benches, which is more cost effective and may facilitate higher pit sinking rates in terms of vertical metres per year. This is considered a future opportunity that has not been incorporated into the base case mine plan.
The ultimate pit designs contain sufficient ROM quantities to support a 10,000 tpd processing rate through to late 2021. The open pit Mineral Reserves are included in eight pits, with two largest pits, Urucum and Tap AB containing 95% of the total open pit Mineral Reserves. Oxide ore contributes 22% of the total open pit ore mined. The LOM average strip ratio is 6:1.
Mine waste dumps are located adjacent to the pits, to minimize hauling requirements. Waste dumping platforms are laid out to facilitate dump re-sloping at mine closure.
The LOM production schedule has been prepared quarterly based on the mining activities commencing in Q4 2019. The pit production is founded on mining the ultimate pit bench-by-bench without phases or subdivisions. The LOM pit mining rate averages approximately 66,000 tpd and includes both mineralization and waste material.
The plant feed comprises the ROM ore from the pit and from the stockpiles. The pit ROM production is projected to be a direct feed to the crusher, complemented with the ROM from the stockpiles re-handled on as needed basis.
Contractor mining is carried out by U&M, one of the largest mining contractors in Brazil, using conventional open pit methods, consisting of the following activities:
Drilling performed by conventional production drills.
Blasting using emulsion explosives and a downhole delay initiation system.
Loading and hauling operations performed with hydraulic shovel, front-end loader, and rigid frame and articulated haulage trucks.
The owner’s personnel monitor the mining contractor and provide engineering support including survey and grade control. Operations run 24 hours per day, seven days a week, on an eight-hour shift rotation.
The open pit is scheduled to operate 365 days per year, 24 hours per day. The U&M work schedule utilizes four crews working eight-hour shifts.
Equipment productivity and utilization factors and equipment operating hour estimates are based on seasonal conditions (dry, transitional, or wet season during the calendar year), rock type, and various mining conditions including different bench mining width and ramp width.
The mine manpower at the end of September 2019 is estimated at approximately 1,493 employees. This includes owner’s and contractor’s workforce. The ongoing pit operations will require this level of manpower for most of the next two years.
Open pit operating costs are estimated to average R$13.35/t mined ($3.51/t moved at a R$/US$ exchange rate 3.8:1) and includes owner and contact mining operating costs. The cost is estimated based on material quantities and unit costs supplied from existing operations comprised of actual 2019 operating costs, projected operating costs, and the current mining contracted rates. The pit operating cost estimate was developed based on cost for drilling, blasting, loading, and hauling and includes labour costs and costs for consumables (diesel, explosive, parts, etc.).

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 25-3
 www.rpacan.com

 

 

Underground Mining

Underground Mineral Reserves are based on a 2016 Pre-Feasibility Study (PFS) carried out by AMC. RPA reviewed the AMC PFS, and made the following adjustments:
Updated the cost estimates to reflect current inputs and a stand-alone underground mining scenario.
Updated cut-off grades.
Filtered out stopes that no longer met updated cut-off grades.
Rebalanced the production schedule.
Modern trackless mobile equipment is proposed for the development and stoping operations.
The mine will be accessed by a single portal located at the northern end of Urucum North and twin declines (north and south) based on an orebody strike length of >800 m.
Level intervals will be 20 m (based on 15 m production blastholes and the narrow width of some lodes) with crosscuts between the decline and the mineralization, every 20 vm.
Declines have been designed to allow equipment access to each production level. On each level a crosscut will be developed from the decline to the ore lode/lodes. Decline and crosscut development have been designed at 5.0 m wide x 5.0 m high, sufficient to accommodate 30 t to 40 t trucks.
Ore drives have been designed to be 5.0 m high x 4.0 m wide to accommodate production drills and 10 t load-haul-dump (LHD) units. Trucks will not enter the ore drives.
All waste will be tipped directly into stopes or trucked to surface.
Approximately 2.1 million tonnes (Mt) of ore at an average grade of 4.1 g/t Au will be mined and processed over the 6.5 mine life.
All ore production and mine development is proposed to be done by contractors; this includes all waste rock filling.
Ventilation will be provided via a pull-type (exhausting) system with primary fans located on surface at the top of each of two primary exhaust raises.
With the infrastructure airflow and leakage and balancing allowances, the total airflow determination based on the diesel fleet size is 350 m3/s.
Evaluation of the planned production rate and scheduling indicates that the deposit supports 450,000 tpa to 500,000 tpa. Production rates vary from year to year depending on the number of production fronts becoming available in different areas of the mine.

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 25-4
 www.rpacan.com

 

 

There are opportunities for further optimization of the production rate in future studies, particularly if additional areas are considered for underground mining (e.g., Urucum Central).
Major scheduling assumptions driving these production rates include: decline and crosscut advance of 140 m/month, ore drive advance of 60 m/month, production rate from stoping of 10,000 t/month for both Uphole retreat and Benching stopes, backfilling rate of 12,000 m3 per month, per stope, for Benching stopes. All scheduling assumptions are based on industry benchmarked data.
Scheduling has been based on maintaining a nearly constant number of primary mobile equipment in both the North and South declines.
Workforce size at full production is estimated to be 240 employees, based on three eight-hour shifts.
The underground mine would use some of the existing infrastructure built for the open pit operations such as the explosives magazines and warehouse.
Mining costs are estimated to be $50.00/t of ore milled and total operating costs, inclusive of processing and G&A, are estimated to be $75.80/t of ore milled.
An economic assessment of the Underground Mineral Reserves confirms that they are economically viable at the base gold price of $1,250/oz.

 

Mineral Processing

A new grinding configuration (semi-autogenous grinding + ball mill) has allowed Tucano to increase the percentage of sulphide ore in the overall plant blend without substantially affecting their target throughput. This was done while maintaining the % passing at 75 µm to 85 µm.
The plant was originally designed to run at 3.4 million tonnes per annum (Mtpa) considering 90% Sulphide in the blend. The plant blend from May to September 2019 was close to 95% sulphide ore and 5% oxide material and the average annual plant throughput was 3.1 Mtpa, however, this annual figure was affected by lower plant availabilities (i.e., 89%) due to other issues experienced in the plant such as mill grade breakages, power issues and also, issues with the old primary crusher.
The increasing percentage of sulphide ore has not adversely affected plant gold recoveries. On the contrary, the new oxygen plant commissioned in April 2019 has contributed to higher metal recoveries, which resulted in an average gold recovery of 93% from May to December 2019.

 

Infrastructure

The Mine is currently operating and has all of the required infrastructure to carry on operations. Additional surface infrastructure will be required to support the underground operation.
The remaining tailings storage facility (TSF) capacity is 1,879 Mm3, which is sufficient for eight months, from December 2019 to June 2020.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 25-5
 www.rpacan.com

 

 

The Mine plans to extend the tailings storage capacity by commissioning three new TSFs, East Dam, East-NW Extension, and West Pond Phase 2 (WPP2), which together will provide approximately 32 Mm3 of tailings storage.

 

Environment, Permitting, and Social Aspects

The Tucano Gold Mine is in possession of all licences required for the operation of the mine, mill, processing plant, and TSFs in compliance with Brazilian regulations. There is currently one licence that is in the process of being renewed and is expected by the third quarter of 2020. While in the process of renewal the current licence remains valid.
Continuous monitoring programs are carried out at the Project, which confirm that there are no material concerns pertaining to non-compliance.
The Mine implements stakeholder engagement and social investment programs focused in three main areas: socio-economic development, public health and safety, and education. The social performance practices at the Project are effective and enable the Mine to maintain a good level of social acceptance. No significant issues with the local communities have been identified since production re-started in 2012.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 25-6
 www.rpacan.com

26 Recommendations

Based on the site visit and subsequent review of the available documentation, the following recommendations are offered:

 

Geology and Mineral Resources

Evaluate the potential for adjacent lithologies to the BIF and carbonate units for their potential of hosting significant quantities of gold mineralization.
Carry out a program of assay-to-extinction to more fully understand the nature of the gold distribution of the mineralized samples.
Determine the genetic and temporal relationships between the gold mineralization and the pegmatite units.
Prepare a separate series of underground wireframe interpretations for the Urucum deposit using cut-off grade and minimum width criteria that are reflective of the envisioned operational scenario for an underground mining operation.
Review the capping value applied to the short term grade control block model in consideration of all available drill hole and sample information, as well as all information collected from the plant reconciliation studies.
Carry out additional drill testing to define and outline the extents of the higher grade mineralized shoots found at the Urucum deposit.
Continue contouring exercises for the remainder of the mineralized wireframes present at the Urucum deposit as aids in conducting future variogram analyses as well as aids for developing exploration targets. These contouring exercises should examine not only the distribution of the gold grades alone, but also examine the grade times thickness product.
For future updates to the Urucum long term Mineral Resource block models, use common origins with the short term grade control block models.
Prepare future long term block models for the Urucum deposit using more stringent search strategies that are designed to improve the accuracy of the estimated grades at the local level.
Carry out future updates to the Urucum long term Mineral Resource block models using a sub-blocked block model framework so that the volumes and grades of the mineralized wireframed can be easily modelled with a high degree of accuracy.
Ensure that the estimation parameters and workflows are harmonized between the long term Mineral Resource block model and the short term grade control block model for the Urucum deposit.
Prepare a separate series of underground wireframe interpretations for the Tap AB deposit using cut-off grade and minimum width criteria that are reflective of the envisioned operational scenario for an underground mining operation.
Determine the location of the oxidized to fresh rock transition at the Tap AB deposit to a higher degree of accuracy, particularly in the area of the AB 1 deposit.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 26-1
 www.rpacan.com

 

 

Carry out additional drill testing to define and outline the extents of the higher grade mineralized shoots found at the Tap AB deposit.
Evaluate the down-dip projections of the BIF and carbonate units for the Tap C sector for their potential of hosting significant quantities of gold mineralization.

 

Mining and Mineral Reserves

Open Pit Mining

Geotechnical monitoring of open pit stability is imperative to follow best practices for both production and safety reasons. Standard open pit slope monitoring using a prism network should be established and developed continuously as open pit mining progresses.
Review pit design for Urucum Central South once the results of the geotechnical remediation plan are available.
Mining dilution should be controlled as it is a critical modifying factor when estimating Mineral Reserves, since there is an added cost associated with the processing of the waste dilution material.
A full reconciliation of actual plant feed and gold production versus mine plan prediction should be carried out on an ongoing basis in order to more accurately determine the mining dilution and ore loss parameters.
Additional resources in the mine proximity may extend the open pit mine life. While such resources have not yet been identified, RPA is aware that brownfield exploration is underway to see if such opportunities may exist for the near term.

 

Underground Mining

Complete further drilling and investigation work aimed at upgrading Inferred Mineral Resources and increasing the geotechnical and hydrogeological understanding of the deposit at depth, in order to consolidate the design basis for the underground project.
Advance the Underground Project to the FS stage. Opportunity exists to stage the Project such that the second ramp is delayed until production from the first ramp proves successful and mining costs are better understood.
Develop and operate the underground mine with contractors; this resolves any issues regarding supply of an experienced underground work force and allows for a reduction in upfront capital expenditure for mobile equipment.
Consider using truck haulage for all material movement in the underground mine.
Carry out further geotechnical analysis to facilitate design and the efficient recovery of pillars. Detailed geotechnical modelling is recommended during the FS stage. This will also assist with understanding of the potential dilution, particularly in the narrower veins.
Complete further metallurgical test work particularly on the primary sulphide material that will be extracted from underground. There is a risk that unexpected changes to metallurgical performance and gold recovery may occur.
Complete further environmental work during the FS stage to ensure that the underground operations do not present any issues in terms of environmental compliance. Any compliance issues could inadvertently delay the project or add additional unplanned costs to the project.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 26-2
 www.rpacan.com

 

 

Opportunities exist to reduce capital costs for the underground project through locally constructed surface change rooms and offices rather than rental and may be an inexpensive alternative. The use of less expensive Scania P420 trucks for underground haulage once the decline roadway (floor) has been prepared and graded is also an opportunity. These options should be evaluated during the FS.

 

Mineral Processing

Tucano will start a program to improve the understanding of the ore hardness distribution in some of the major deposits. With special consideration to ores potentially extracted from a future underground mine.
The plant currently has dated equipment in need of replacement such as the Primary Crusher.
Further investigation and test work is required to optimize the current cyanide consumption rates, which averaged 1.4 kg/t ore from May to September 2019, which is much higher than the average consumption rates reported in past metallurgical test work.
Further testing to optimize oxygen consumption is also required.
Improving process control tools, especially for the grinding and CIL unit operations, may result in performance gains.
Mineralogical characterization should be undertaken to better understand the influence of other contaminants in plant performance and cyanide consumption.

 

Environment

Environmental aspects in the Amazon region is a global theme, and many efforts have been carried out to preserve this world heritage. Therefore, Great Panther should continue following high environmental standards and updating its best practices procedures in accordance with the regulations in force for the area of the Tucano Gold Mine.

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 26-3
 www.rpacan.com

27 References

AMC Consultants Pty Ltd, 2016, Urucum Deeps Prefeasibility Study, BDR Resources Ltd. AMC Consultants: Melbourne, Australia. Report: AMC Project 115058.

 

AMC Consultants Pty Ltd, 2018, Mineral Resource and Reserve Update for the Tucano Gold Mine, prepared for Great Panther Silver Limited, AMC Mining Consultants (Canada) Ltd.’ November 6, 2018.

 

Ausenco and SRK Consulting, 2011, Beadell Resources Ltd Tucano Gold Project Feasibility Study Report, Ausenco Minerals and Metals & SRK Consulting: Perth, Australia. Report no. 2027-RPT-0037 Revision Number D.

 

Canadian Institute of Mining, Metallurgy and Petroleum (CIM), 2014, CIM Definition Standards for Mineral Resources and Mineral Reserves, Prepared by the CIM Standing Committee on Reserve Definitions and Adopted by CIM Council on May 10, 2014: available from the CIM website at www.CIM.org, 9 p.

 

Cooley, M., 2019, Pre-metamorphic Gold Mineralization Compressed and Stretched into Parallelism with Local Amphibolite Grade Metamorphic Lineation at Tucano Mine Trend, Brazil: unpublished internal document prepared for Great Panther Mining Ltd, 29 p.

 

Costa, A., 2005, Levantamento Geofisico. Technical Report, January 2005. AFC Geofisica Ltda for MPBA.

 

GeoHydroTech Engenharia S/S, 2019, Projeto Conceitual da Barragem De Rejeitos Leste - Extensão NW Especificação Relatório Técnico de Projeto, Report BDL-005-1179-ET-001, March 28, 2019.

 

Great Panther Mining Limited, 2019, Great Panther Announces High Grade Drilling Results from Exploration Program at the Tucano Gold Mine: News Release issued on July 30, 2019 and available on the SEDAR website at www.SEDAR.com, 6 p.

 

Great Panther Mining Limited, 2020, Great Panther Provides 2020 Exploration Plans for Tucano Gold Mine: News Release issued on February 6, 2020 and available on the SEDAR website at www.SEDAR.com, 4 p.

 

Mineral Engenharia e Meio Ambiente Ltda, 2019, Asset Retirement Obligation (ARO) Report, December 2019.

 

Navarro, L., 2019, “Urucum Pit, Slope Stability Analysis” by Luis Navarro geology and services, September 2019

 

O’Bryan, P., 2016, Technical Memorandum titled “Tap AB & Urucum pit re-design review” by Peter O’Bryan & Associates, May 4, 2016

 

Wolfe, B., Spicer, N., Batelochi, M., Lacourt, R., Moreno, J., O’Bryan, P., Walton, R., and Methven, G., 2018, Technical Report, Mineral Resource and Mineral Reserve Update for the Tucano Gold Mine: report available on the SEDAR website at www.SEDAR.com, 265 p.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 27-1
 www.rpacan.com

 

 

Klinkert, P. and Van den Berg, H., 2001, SPECTREM Survey of the Amapa Area, April 2001. Exploration and Acquisition Division, Anglo Operations Limited.

 

SRK Consultores do Brasil Ltda, 2011, Plano de Controle Ambiental PCA (Environmental Control Plan), SRK Consultores do Brasil Ltda : Belo Horizonte, MG, Brasil. Report: SRK 031.11 30 de Setembro de 2011 - Revisão 02.

 

Tomlinson, A. Jurza, P. Li, D. Trunfull, J. and Peters, P., 2015, Tucano Project Brazil - Geophysical Data Processing, 4 November 2015. Southern Geoscience Consultants: Perth, Australia. Report No.SGS3014.

 

Walter, B.M.T.; Cavalcanti, T.B. (eds. tec.), 2005, Fundamentos para a coleta de germoplasma vegetal. Embrapa Recursos Genéticos e Biotecnologia, Brasília, DF.

 

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 27-2
 www.rpacan.com

28 Date and Signature Page

This report titled “Technical Report on the 2019 Mineral Resources and Mineral Reserves of the Tucano Gold Mine, Amapá State, Brazil”, dated March 25, 2020, with an effective date of December 31, 2019, was prepared and signed by the following authors:

 

 

  (Signed and Sealed) Reno Pressacco
   
Dated at Toronto, ON Reno Pressacco, M.Sc.(A), P.Geo.
March 25, 2020 Principal Geologist
   
   
  (Signed and Sealed) Jason J. Cox
   
Dated at Toronto, ON Jason J. Cox, P.Eng.
March 25, 2020 Technical Director - Canada Mining Advisory
   
   
  (Signed and Sealed) Goran Andric
   
Dated at Toronto, ON Goran Andric, P.Eng.
March 25, 2020 Principal Mining Engineer
   
   
  (Signed and Sealed) Fernando A. Cornejo
   
   
Dated at Vancouver, BC Fernando A. Cornejo, M.Eng., P.Eng.
March 25, 2020 Vice-President, Projects & Technical Services
  Great Panther
   
   
  (Signed and Sealed) Neil Hepworth
   
Dated at Vancouver, BC Neil Hepworth, M.Sc., CEng MIMMM
March 25, 2020 Chief Operating Officer, Great Panther
   
   
  (Signed and Sealed) Marcelo Antonio Batelochi
   
Dated at Vancouver, BC Marcelo Antonio Batelochi, MAusIMM
March 25, 2020 Director of Geology, Tucano Gold Mine

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 28-1
 www.rpacan.com

29 Certificate of Qualified Person

Reno Pressacco

I, Reno Pressacco, M.Sc.(A), P.Geo., as an author of this report entitled “Technical Report on the 2019 Mineral Resources and Mineral Reserves of the Tucano Gold Mine, Amapá State, Brazil”, prepared for Great Panther Mining Limited and dated March 25, 2020, with an effective date of December 31, 2019, do hereby certify that:

 

1.I am Principal Geologist with Roscoe Postle Associates Inc., now part of SLR Consulting Ltd, of Suite 501, 55 University Ave., Toronto, ON M5J 2H7.

 

2.I am a graduate of Cambrian College of Applied Arts and Technology, Sudbury, Ontario, in 1982 with a CET Diploma in Geological Technology; Lake Superior State College, Sault Ste. Marie, Michigan, in 1984, with a B.Sc. degree in Geology; and McGill University, Montreal, Québec, in 1986 with a M.Sc.(A) degree in Mineral Exploration.

 

3.I am registered as a Professional Geologist in the Province of Ontario (Reg. #939). I have worked as a geologist for a total of 34 years since my graduation. My relevant experience for the purpose of the Technical Report is:
Review and report as a consultant on numerous exploration and mining projects around the world for due diligence and regulatory requirements, including preparation of Mineral Resource estimates and NI 43-101 Technical Reports.
Numerous assignments in North, Central and South America, Europe, Russia, Armenia and China for a variety of deposit types and in a variety of geological environments; commodities including Au, Ag, Cu, Zn, Pb, Ni, Mo, U, PGM, REE, and industrial minerals.
A senior position with an international consulting firm.

 

4.I have read the definition of "qualified person" set out in National Instrument 43-101 (NI 43-101) and certify that by reason of my education, affiliation with a professional association (as defined in NI 43-101) and past relevant work experience, I fulfill the requirements to be a "qualified person" for the purposes of NI 43-101.

 

5.I visited the Tucano Gold Mine from September 15 to 21, 2019.

 

6.I am responsible for Sections 3 to 12, and 14 and relevant disclosure in Sections 1, 2, 25, 26, and 27 of the Technical Report.

 

7.I am independent of the Issuer applying the test set out in Section 1.5 of NI 43-101.

 

8.I have had no prior involvement with the property that is the subject of the Technical Report.

 

9.I have read NI 43-101, and the Technical Report has been prepared in compliance with NI 43-101 and Form 43-101F1.

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 29-1
 www.rpacan.com

 

 

10.At the effective date of the Technical Report, to the best of my knowledge, information, and belief, the Technical Report contains all scientific and technical information that is required to be disclosed to make the Technical Report not misleading.

 

 

Dated this 25th day of March 2020

 

(Signed and Sealed) Reno Pressacco

 

Reno Pressacco, M.Sc.(A), P.Geo.

 

 

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 29-2
 www.rpacan.com

 

Jason J. Cox

I, Jason J. Cox, P.Eng., as an author of this report entitled “Technical Report on the 2019 Mineral Resources and Mineral Reserves of the Tucano Gold Mine, Amapá State, Brazil”, prepared for Great Panther Mining Limited and dated March 25, 2020, with an effective date of December 31, 2019, do hereby certify that:

 

1.I am Technical Director - Canada Mining Advisory with Roscoe Postle Associates Inc., now part of SLR Consulting Ltd, of Suite 501, 55 University Ave., Toronto, ON M5J 2H7.

 

2.I am a graduate of the Queen’s University, Kingston, Ontario, Canada, in 1996 with a Bachelor of Science degree in Mining Engineering.

 

3.I am registered as a Professional Engineer in the Province of Ontario (Reg. #90487158). I have worked as a mining engineer for more than 21 years since my graduation. My relevant experience for the purpose of the Technical Report is:
Review and reporting as a consultant on many mining operations and projects around the world for due diligence and regulatory requirements
Engineering study work (PEA, PFS, and FS) on many mining projects around the world, including commodities such as precious metals, base metals, bulk commodities, industrial minerals, and rare earths
Operational experience as Planning Engineer and Senior Mine Engineer at three North American mines
Contract Co-ordinator for underground construction at an American mine

 

4.I have read the definition of "qualified person" set out in National Instrument 43-101 (NI 43-101) and certify that by reason of my education, affiliation with a professional association (as defined in NI 43-101) and past relevant work experience, I fulfill the requirements to be a "qualified person" for the purposes of NI 43-101.

 

5.I have not visited the Tucano Gold Mine.

 

6.I am responsible for the underground mining portions of Sections 15, 16, 21, and 22 and related disclosure in Sections 1, 2, 25, 26, and 27 of the Technical Report.

 

7.I am independent of the Issuer applying the test set out in Section 1.5 of NI 43-101.

 

8.I have had no prior involvement with the property that is the subject of the Technical Report.

 

9.I have read NI 43-101, and the Technical Report has been prepared in compliance with NI 43-101 and Form 43-101F1.

 

10.At the effective date of the Technical Report, to the best of my knowledge, information, and belief, the Technical Report contains all scientific and technical information that is required to be disclosed to make the Technical Report not misleading.

 

Dated this 25th day of March 2020

 

(Signed and Sealed) Jason J. Cox

 

Jason J. Cox, P.Eng.

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 29-3
 www.rpacan.com

 

Goran Andric

I, Goran Andric, P.Eng., as an author of this report entitled “Technical Report on the 2019 Mineral Resources and Mineral Reserves of the Tucano Gold Mine, Amapá State, Brazil”, prepared for Great Panther Mining Limited and dated March 25, 2020, with an effective date of December 31, 2019, do hereby certify that:

 

1.I am Principal Mining Engineer with Roscoe Postle Associates Inc., now part of SLR Consulting Ltd, of Suite 501, 55 University Ave., Toronto, ON M5J 2H7.

 

2.I am a graduate of the University of Belgrade, Serbia, in 1988 with a B.Sc. degree in Mining and Mineral Engineering.

 

3.I am registered as a Professional Engineer in the Province of Ontario (Reg. #100103151). I have worked as a mining engineer for more than 25 years since my graduation. My relevant experience for the purpose of the Technical Report is:
Operational and consulting experience in coal, base metal, and precious metal projects in North and South America, Europe, Asia, and Africa.
Principal Mining Engineer with an international consulting firm, with responsibilities including conceptual and feasibility studies, project management, open pit mine design and planning, equipment selection and costing, economic analysis, practical solutions for operational improvements, and preparation of NI 43-101 and Competent Person’s reports.
Mine Superintendent at a coal mine in British Columbia.
Shift Production Engineer to Assistant Mine Manager at a large-scale coal mine in Europe.

 

4.I have read the definition of "qualified person" set out in National Instrument 43-101 (NI 43-101) and certify that by reason of my education, affiliation with a professional association (as defined in NI 43-101) and past relevant work experience, I fulfill the requirements to be a "qualified person" for the purposes of NI 43-101.

 

5.I visited the Tucano Gold Mine from October 20 to 26, 2019.

 

6.I am responsible for the open pit mining portions of Sections 15, 16, 21, and 22 and related disclosure in Sections 1, 2, 25, 26, and 27 of the Technical Report.

 

7.I am independent of the Issuer applying the test set out in Section 1.5 of NI 43-101.

 

8.I have had no prior involvement with the property that is the subject of the Technical Report.

 

9.I have read NI 43-101, and the Technical Report has been prepared in compliance with NI 43-101 and Form 43-101F1.

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 29-4
 www.rpacan.com

 

 

10.At the effective date of the Technical Report, to the best of my knowledge, information, and belief, the Technical Report contains all scientific and technical information that is required to be disclosed to make the Technical Report not misleading.

 

 

Dated this 25th day of March 2020

 

(Signed and Sealed) Goran Andric

 

Goran Andric, P.Eng.

 

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 29-5
 www.rpacan.com

 

Fernando A. Cornejo

I, Fernando A. Cornejo, M.Eng., P.Eng., as an author of this report entitled “Technical Report on the 2019 Mineral Resources and Mineral Reserves of the Tucano Gold Mine, Amapá State, Brazil”, prepared for Great Panther Mining Limited and dated March 25, 2020, with an effective date of December 31, 2019, do hereby certify that:

 

1.I am Vice-President, Projects & Technical Services with Great Panther Mining Limited, of 1330-200 Granville St., Vancouver, Canada, V6C 1S4.

 

2.I graduated with a Bachelor Degree in Chemical Engineering, from Universidad Nacional de San Agustin, Arequipa, Peru in 2001 and a Masters Degree in Chemical Engineering from Ecole Polytechnique de Montreal, Canada in 2005.

 

3.I am registered as a Professional Engineer in the Province of Ontario (Reg.# 100170042). I have practiced my profession since 2001 in a range of operational, technical, and mineral processing consulting roles in Canada, Brazil, Mexico, and Peru. My relevant experience for the purpose of the Technical Report is eighteen years’ experience in operational and processing consulting roles in four continents, with a strong focus in Brazil and Mexico over the last eight years.

 

4.I have read the definition of "qualified person" set out in National Instrument 43-101 (NI 43-101) and certify that by reason of my education, affiliation with a professional association (as defined in NI 43-101) and past relevant work experience, I fulfill the requirements to be a "qualified person" for the purposes of NI 43-101.

 

5.I visited the Tucano Gold Mine multiple times throughout 2019 and 2020.

 

6.I am responsible for Sections 13 and 17 and related disclosure in Sections 1, 2, 25, 26, and 27 of the Technical Report.

 

7.I am not independent of the Issuer applying the test set out in Section 1.5 of NI 43-101.

 

8.I have had been involved with the property that is the subject of the Technical Report since July 2019.

 

9.I have read NI 43-101, and the Technical Report has been prepared in compliance with NI 43-101 and Form 43-101F1.

 

10.At the effective date of the Technical Report, to the best of my knowledge, information, and belief, the Technical Report contains all scientific and technical information that is required to be disclosed to make the Technical Report not misleading.

 

 

Dated this 25th day of March 2020

 

(Signed and Sealed) Fernando A. Cornejo

 

Fernando A. Cornejo, M.Eng., P.Eng.

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 29-6
 www.rpacan.com

 

Neil Hepworth

I, Neil Hepworth, M.Sc., CEng MIMMM, as an author of this report entitled “Technical Report on the 2019 Mineral Resources and Mineral Reserves of the Tucano Gold Mine, Amapá State, Brazil”, prepared for Great Panther Mining Limited and dated March 25, 2020, with an effective date of December 31, 2019, do hereby certify that:

 

1.I am Chief Operating Officer with Great Panther Mining Limited of 1330-200 Granville Street Vancouver, Canada, V6C 1S4.

 

2.I am a graduate of Witwatersrand University, in 1979 with a Bachelor of Science Honours degree in Geology and in 1985 with a Master of Science degree in Mining Engineering.

 

3.I am registered as a Chartered Engineer in UK (Engineering Council ID 467020). I have worked as a Mining Engineer for over 30 years since my graduation. My relevant experience for the purpose of the Technical Report is:
Operational and technical experience in numerous mining operations around the world.

 

4.I have read the definition of "qualified person" set out in National Instrument 43-101 (NI 43-101) and certify that by reason of my education, affiliation with a professional association (as defined in NI 43-101) and past relevant work experience, I fulfill the requirements to be a "qualified person" for the purposes of NI 43-101.

 

5.I have visited the Tucano Gold Mine on a regular basis since November 2019.

 

6.I am responsible for Sections 18 and 19, and related disclosure in Sections 1, 2, 25, 26, and 27 of the Technical Report.

 

7.I am not independent of the Issuer applying the test set out in Section 1.5 of NI 43-101.

 

8.I have been involved with the property that is the subject of the Technical Report since November 2019.

 

9.I have read NI 43-101, and the Technical Report has been prepared in compliance with NI 43-101 and Form 43-101F1.

 

10.At the effective date of the Technical Report, to the best of my knowledge, information, and belief, the Technical Report contains all scientific and technical information that is required to be disclosed to make the Technical Report not misleading.

 

 

Dated this 25th day of March 2020

 

(Signed and Sealed) Neil Hepworth

 

Neil Hepworth, M.Sc., CEng MIMMM

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 29-7
 www.rpacan.com

 

Marcelo Antonio Batelochi

I, Marcelo Antonio Batelochi, MAusIMM, as an author of this report entitled “Technical Report on the 2019 Mineral Resources and Mineral Reserves of the Tucano Gold Mine, Amapá State, Brazil”, prepared for Great Panther Mining Limited and dated March 25, 2020, with an effective date of December 31, 2019, do hereby certify that:

 

1.I am Director of Geology of the Tucano Gold Mine of Estrada do Taperebá, SN, Pedra, Branca do Amapari - AP, Brasil.

 

2.I am a graduate of the School of Geology at UNESP - São Paulo State University, Brazil, in 1991 with a Bachelor of Honors degree.

 

3.I am a practicing geologist registered with the AusIMM - The Australasian Institute of Mining and Metallurgy (Membership No. 205477). I have practiced my profession continuously for 28 years since my graduation. My relevant experience for the purpose of the Technical Report is:
More than 20 years of experience in the mineral resource evaluation of Iron, Copper / Gold, Nickel, Bauxite, REE, and PGE Deposits, as employee of Rio Tinto (12 years), Vale (4 years), Ferrous Resources (6 years), Independent Consultant (8 years) and since July 2019 as Director of Geology of Tucano Gold Mine.
I have worked on the Tucano deposits since 2012 carrying out Mineral Resources Estimates as an independent consultant for Urucum, Urucum Underground, Tap-AB and Tap C + Gap, and Duckhead. Also, Tartarugalzinho Project.
My previous experience on gold deposits included: Yamana Gold (included Brio Gold), Aura Minerals, Baixada Cuiabana Garimpos and PA-Gold (Mato Grosso State) as a Consultant and Qualified Person. Also “Morro do Ouro” Mine, where I worked for 10 years as manager of geology and mining planning (when the Mine belonged to Rio Tinto).

 

4.I have read the definition of "qualified person" set out in National Instrument 43-101 (NI 43-101) and certify that by reason of my education, affiliation with a professional association (as defined in NI 43-101) and past relevant work experience, I fulfill the requirements to be a "qualified person" for the purposes of NI 43-101.

 

5.I have visited the Tucano Gold Mine multiple times.

 

6.I am responsible for Sections 20, 23, and 24, and related disclosure in Sections 1, 2, 25, 26, and 27 of the Technical Report.

 

7.I am not independent of the Tucano Gold Mine pursuant to Section 1.5 of the Instrument.

 

8.I have been involved with the property that is the subject of the Technical Report as a consultant from 2012 to 2019 and currently as Director of Geology since July 2019.

 

9.I have read NI 43-101, and the Technical Report has been prepared in compliance with NI 43-101 and Form 43-101F1.

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 29-8
 www.rpacan.com

 

 

10.At the effective date of the Technical Report, to the best of my knowledge, information, and belief, the Technical Report contains all scientific and technical information that is required to be disclosed to make the Technical Report not misleading.

 

 

Dated this 25th day of March 2020

 

(Signed and Sealed) Marcelo Antonio Batelochi

 

Marcelo Antonio Batelochi, MAusIMM

 

 

 

 

 

 

 

 

Great Panther Mining Limited – Tucano Gold Mine, Project #3186

Technical Report NI 43-101 – March 25, 2020

Page 29-9