XML 74 R49.htm IDEA: XBRL DOCUMENT  v2.3.0.11
Rate Matters (Details) (USD $)
In Millions, unless otherwise specified
12 Months Ended
Dec. 31, 2012
Dec. 31, 2011
Dec. 31, 2010
Jun. 30, 2011
Rate Proceedings [Abstract]        
Authorized percentage increase (decrease) for electric   2.30% 3.30%  
Authorized rate increase (decrease) for electric   $ 8.0 $ 11.9  
Authorized percentage increase (decrease) for gas   1.00% (0.74%)  
Authorized rate increase (decrease) for gas   1.9 (1.5)  
Fuel rules bandwidth   2.00% 2.00%  
Authorized return on common stock   10.30% 10.40%  
Utility common equity   58.10% 55.30%  
Proposed percent increase (decrease) for electric 4.90%      
Proposed percent increase (decrease) for gas 1.20%      
Fuel Rules [Abstract]        
Electric fuel deferred costs upper threshold   102.00%    
Electric fuel deferred costs lower threshold   98.00%    
Authorized electric fuel costs refund     0.3  
Increased electric fuel costs deferred       2.7
Purchased Gas Adjustment [Abstract]        
Purchased gas adjustment over collected     $ 4.8 $ 1.6