Environmental - MGE Energy and MGE.

 

Columbia

In February 2021, MGE and the other co-owners of Columbia announced plans to retire that facility. The co-owners intend to retire Unit 1 and Unit 2 by June 2026. Final timing and retirement dates are subject to change depending on operational, regulatory, and other factors. Effects of the environmental compliance requirements discussed below will depend upon the final Columbia retirement dates approved and required compliance dates.

 

Water Quality

Water quality regulations promulgated by the EPA and WDNR in accordance with the Federal Water Pollution Control Act, commonly known as the Clean Water Act (CWA), impose restrictions on discharges of various pollutants into surface waters. The CWA also regulates surface water quality issues that affect aquatic life, such as water temperatures, chemical concentrations, intake structures, and wetlands filling into Waters of the U.S. (WOTUS), defined by EPA regulation. The CWA also includes discharge standards, which require the use of effluent-treatment processes equivalent to categorical "best practicable" or "best available" technologies. The CWA regulates discharges from "point sources," such as power plants, by establishing discharge limits via water discharge permits. MGE's power plants operate under Wisconsin Pollution Discharge Elimination System (WPDES) permits issued by the WDNR to ensure compliance with these discharge limits. Permits are subject to periodic renewal.

 

Effluent Limitations Guidelines and Standards for Steam Electric Power Generating Point Source Category

The EPA's promulgated water Effluent Limitations Guidelines (ELG) and standards for steam electric power plants focus on the reduction of metals and other pollutants in wastewater from new and existing power plants.

 

With the closure of the wet pond system (as described in further detail in the CCR section below), Columbia will be in compliance with ELG requirements.

 

The Elm Road Units needed to satisfy the ELG rule's requirements no later than December 2023, as determined by the permitting authority. Installation of additional wastewater treatment equipment was needed to comply with the ELG Rule. Construction began in March 2022 and was completed in December 2023. MGE's share of the costs to comply with the rule was approximately $4 million.

 

In March 2023, the EPA published a proposed update to this rule that would further regulate the wastewater discharges associated with coal-fired power plants. The proposed rule focuses on wastewater discharges from flue gas desulfurization, bottom ash transport water, and combustion residual leachate. The proposed rule includes some flexibility for plants that have already installed pollution controls based on previous versions of the rule, and flexibility for plants that will be retiring or switching to natural gas by certain dates. MGE expects this rule, if finalized as proposed, to impact our Elm Road Units. However, we will not know the impact of this rule with any certainty until the rule is finalized.

 

Cooling Water Intake Rules (Section 316(b))

The EPA's cooling water intake rules requires cooling water intake structures at electric power plants to meet best technology available (BTA) standards to reduce the mortality from entrainment (drawing aquatic life into a plant's cooling system) and impingement (trapping aquatic life on screens).

Blount received its most recent WPDES permit from the Wisconsin Department of Natural Resources (WDNR) in October 2023. Blount's latest WPDES permit assumes that the plant meets BTA standards for entrainment for the duration of this permit which expires in 2028. The WDNR included a requirement to conduct an impingement study in the latest permit which needs to be completed in the next three years. Once the WDNR determines the impingement requirements at Blount, MGE will be able to determine any compliance costs of meeting Blount's permit requirements.

Intakes at Columbia are subject to this rule. The Columbia operator's most recent permit required that studies of intake structures be submitted to the WDNR by November 2023 to help determine BTA. Columbia's permit renewal application is due in 2024 and in November 2023 the Columbia operator timely submitted its renewal application to the WDNR. BTA improvements required by the renewal permit may be coordinated with the owners' plan to retire both units by June of 2026. MGE will continue to work with Columbia's operator to evaluate regulatory requirements in light of the planned retirements. MGE does not expect this rule to have a material effect on Columbia.

 

Air Quality

Federal and state air quality regulations impose restrictions on various emissions, including emissions of particulate matter (PM), sulfur dioxide (SO2), nitrogen oxides (NOx), and other pollutants, and require permits for operation of emission sources. These permits have been obtained by MGE and must be renewed periodically. Current EPA initiatives under the Clean Air Act, including the Cross-State Air Pollution Rule (CSAPR) and National Ambient Air Quality Standards (NAAQS), have the potential to result in additional operating and capital expenditure costs for MGE.

 

Greenhouse Gas (GHG) Reduction Guidelines under the Clean Air Act 111(d) Rule

In May 2023, the EPA proposed a rule under section 111 of the Clean Air Act to establish New Source Performance Standards and emission guidelines to limit GHG emissions from existing fossil fuel-fired electric generating units and new, modified, and/or reconstructed fossil fuel-fired power plants. The EPA anticipates promulgating a final rule in 2024. MGE fossil fuel-fired generation units would be subject to the rule as proposed. MGE expects larger-sized units with long range retirement plans, West Riverside and the Elm Road units, may need to employ technology to achieve the proposed reductions. Columbia may not be impacted due to the owners' planned retirement of the existing fossil fuel fired units by 2026. However, we will not know the impact of this rule with any certainty until the rule is finalized.

 

National Ambient Air Quality Standards (NAAQS) and Related Rules

The EPA's NAAQS regulations have been developed to set allowable ambient levels of six pollutants to protect sensitive human populations (primary NAAQS) and the environment (secondary NAAQS) from the negative effects of exposure to these pollutants. The Clean Air Act requires that the EPA periodically review, and adjust as necessary, the NAAQS for these six air pollutants. The EPA's NAAQS review can result in a lowering of the allowed ambient levels of a pollutant, a change in how the pollutant is monitored, and/or a change in which sources of that pollutant are regulated. States implement any necessary monitoring and measurement changes and recommend areas for attainment (meets the ambient requirements) or nonattainment (does not meet these standards). The EPA makes final attainment and nonattainment determinations. States must come up with a State Implementation Plan (SIP) to get nonattainment areas into attainment and maintain air quality in attainment areas Stationary sources of air emissions located in a nonattainment area will be most affected and may be subject to additional data submission and emission measurement requirements during permitting renewals, new emission limitations set by the SIP (which could result in significant capital expenditures), and additional expenses and/or permitting burdens for expanding existing facilities or building new facilities. The process, which starts with determining acceptable primary and/or secondary NAAQS and ends with executing SIPs can take years. Since the NAAQS regulations have the potential to affect both existing and new facilities, MGE continuously monitors changes to these rules to evaluate whether changes could impact its operations. In addition, EPA has adopted interstate transport rules, such as CSAPR, to address contributions to NAAQS nonattainment from upwind sources in neighboring states. In the following paragraphs we discuss specific NAAQS and transport rule developments that may affect MGE.

 

Ozone NAAQS

The Elm Road Units are located in Milwaukee County, Wisconsin, a "moderate" nonattainment area for the 2015 Ozone NAAQS. The deadline for moderate classified areas to meet attainment standards is August 2024. At this time, the operator of the Elm Road Units does not expect that the 2015 Ozone NAAQS or the Milwaukee County nonattainment designation to have a material effect on the Units.

 

Fine Particulate Matter (PM2.5) NAAQS

In January 2023, the EPA published a proposed rule to lower the average annual PM2.5 NAAQS from its current level. The EPA has also solicited comments on whether to lower the annual standard further than the proposed level, and whether to lower the maximum 24-hour limit to be consistent with recommendations from its Clean Air Scientific Advisory Committee (CASAC). Neither the proposed annual PM2.5 NAAQS nor the 24-hour limit recommended by the CASAC are expected to impact the attainment status of the counties where Columbia and the Elm Road Units are located. However, if the annual PM2.5 NAAQS is lowered further than the EPA's currently proposed value, Milwaukee County may be in nonattainment with the standard. A nonattainment designation would require the State of Wisconsin to develop a plan to get into attainment, which may include additional emission limitations for the Elm Road units. However, we will not know the impact of this rule until it is finalized, the EPA determines the attainment status of Wisconsin counties, and the State of Wisconsin develops an attainment implementation plan. MGE will continue to follow the rule's developments.

 

Rules regulating nitrogen oxide (NOx) and sulfur dioxide (SO2) emissions, including the Cross State Air Pollution Rule (CSAPR) and Clean Air Visibility Rule

The EPA's CSAPR and its progeny are a suite of interstate air pollution transport rules designed to reduce ozone and PM2.5 ambient air levels in areas that the EPA has determined as being significantly impacted by pollution from upwind states. This is accomplished through a reduction in NOx and SO2 from qualifying fossil-fuel fired power plants and industrial boilers in upwind "contributing" states. NOx and SO2 contribute to fine particulate pollution and NOx contributes to ozone formation in downwind areas. Reductions are generally achieved through a cap-and-trade system. Individual plants can meet their caps through reducing emissions and/or buying allowances on the market.

In March 2023, the EPA finalized its Federal Implementation Plan to address state obligations under the Clean Air Act "good neighbor" provisions for the 2015 Ozone NAAQS. The final rule impacts 23 states, including Wisconsin. For Wisconsin, the rule includes revisions to the current obligations for fossil-fuel power generation, which includes Blount, Columbia, the Elm Road Units, WCCF, West Riverside, and West Marinette. The final rule became effective partway through the 2023 ozone season in August 2023. Emissions budgets can be met with planned retirements, fuel switching, and immediately available measures, including consistently operating emissions controls already installed at power plants. MGE expects to meet the emission reductions with immediately available measures. In 2026, additional obligations would go into effect, including a further reduction in emissions budgets. Wisconsin would need to submit a SIP to meet its obligations or accept the EPA's Federal Implementation Plan. MGE is reviewing the final rule and is monitoring the multiple lawsuits challenging the final rule. Based on our current evaluation, the 2026 additional emission reductions may impact the Elm Road Units and additional upgrades may be needed to comply, however, we will not know the final impact until evaluations are completed.

 

Clean Air Visibility Rule

Columbia is subject to the best available retrofit technology (BART) regulations, a subsection of Clean Air Visibility Rule, which may require pollution control retrofits. Columbia's existing pollution control upgrades, and the EPA's stance that compliance with the CSAPR equals compliance with BART, should mean that Columbia will not need to do additional work to meet BART requirements. Wisconsin's 2021 SIP argues that Wisconsin will meet its current regional haze goals based on expected emissions reductions, which include Columbia unit retirements. Given that the Wisconsin SIP recognizes the Columbia unit retirements as part of its emission reduction plan, MGE does not anticipate further obligations with this rule at Columbia. MGE will continue to monitor legal developments and any future updates to this rule.

 

Solid Waste

 

Coal Combustion Residuals (CCR) Rule

The CCR rule regulates the disposal of solid waste coal ash and defines what ash use activities would be considered generally exempt beneficial reuse of coal ash. The CCR rule also regulates landfills, ash ponds, and other surface impoundments used for coal combustion residuals by regulating their design, location, monitoring, and operation. The CCR rule requires owners and operators of coal-fired power plants to stop transporting CCR and non-CCR wastewater to unlined surface impoundments. In addition, regulated entities must initiate impoundment closure as soon as feasible and in no event later than April 2021, unless the EPA grants an extension. A site-specific extension to initiate closure of the primary ash pond at Columbia by March 31, 2023, was requested, and was met. The EPA has confirmed that Columbia met the required extension requirements, has documented that Columbia ceased the receipt of waste on March 23, 2023, and has noted that Columbia's obligations under this portion of the CCR Rule are now complete.

 

In July 2021, the PSCW approved a CA application filed by MGE and the other owners of Columbia to install technology required to cease bottom ash transport water discharges rather than extend the longevity of the ash ponds. The coal combustion residuals system that replaced the unlined surface impoundment was placed in-service in March 2023. MGE's share of the costs of the project is approximately $4 million.

 

Review of the Elm Road Units has indicated that the costs to comply with the CCR rule are not expected to be significant.

 

In May 2023, the EPA proposed a CCR Legacy Rule that if finalized as currently written, will apply to previously closed CCR sites. Columbia's operator has evaluated the proposed rule and has determined that parts of the rule would likely apply to Columbia's previously closed site. However, we will not know the impact of this rule with any certainty until the rule is finalized.

 

b.
Legal Matters - MGE Energy and MGE.

 

MGE is involved in various legal matters that are being defended and handled in the normal course of business. MGE accrues for costs that are probable of being incurred and subject to reasonable estimation. The accrued amount for these matters is not material to the financial statements. MGE does not expect the resolution of these matters to have a material adverse effect on its consolidated results of operations, financial condition, or cash flows.

 

Certain environmental groups filed petitions against the PSCW challenging the fixed customer charge set in MGE's 2022/2023 rate settlement, 2023 electric limited reopener, and 2024/2025 rate order. MGE has intervened in the petitions in cooperation with the PSCW. See Footnote 9.a. for more information regarding this matter.

 

c.
Purchase Contracts - MGE Energy and MGE.

 

MGE Energy and MGE have entered into various commodity supply, transportation, and storage contracts to meet their obligations to deliver electricity and natural gas to customers. Management expects to recover these costs in future customer rates.

 

As of December 31, 2023, the future minimum commitments related to these purchase contracts were as follows:

 

(In thousands)

 

2024

 

 

2025

 

 

2026

 

 

2027

 

 

2028

 

 

Thereafter

 

Coal(a)

 

$

24,017

 

 

$

14,445

 

 

$

2,884

 

 

$

 

 

$

 

 

$

 

Natural gas(b)

 

 

42,527

 

 

 

25,733

 

 

 

15,028

 

 

 

2,165

 

 

 

2,165

 

 

 

9,830

 

Purchase power(c)

 

 

5,498

 

 

 

5,608

 

 

 

5,720

 

 

 

5,835

 

 

 

260

 

 

 

 

Renewable energy(d)

 

 

6,426

 

 

 

2,102

 

 

 

2,118

 

 

 

2,135

 

 

 

2,155

 

 

 

26,899

 

Other

 

 

7,571

 

 

 

3,330

 

 

 

4,230

 

 

 

619

 

 

 

131

 

 

 

668

 

 

 

$

86,039

 

 

$

51,218

 

 

$

29,980

 

 

$

10,754

 

 

$

4,711

 

 

$

37,397

 

 

 

(a)
Total coal commitments for MGE's share of the Columbia and Elm Road Units, including transportation. Fuel procurement for MGE's jointly owned Columbia and Elm Road Units is handled by WPL and WEPCO, respectively, who are the operators of those facilities.
(b)
MGE's natural gas transportation and storage contracts require fixed monthly payments for firm supply pipeline transportation and storage capacity. The pricing components of the fixed monthly payments for the transportation and storage contracts are approved by FERC but may be subject to change. MGE's natural gas supply commitments include market-based pricing.
(c)
MGE has a purchase power agreement to help meet future electric supply requirements.
(d)
Operational commitments for solar and wind facilities.
d.
Other Commitments.

 

MGE Energy holds investments in nonpublic venture capital funds. From time to time, these entities require additional capital infusions from their investors. MGE Energy has committed to contribute $7.2 million in capital for such infusions. The timing of these infusions is dependent on the needs of the investee and is therefore uncertain at this time.

 

In addition, MGE Energy has a three-year agreement with a venture debt fund expiring in December 2025. MGE Energy has committed to invest up to a total of $1.5 million into this fund. As of December 31, 2023, MGE Energy has $0.9 million remaining in commitments. The timing of infusions is dependent on the needs of the fund and is therefore uncertain at this time.

 

MGE has several other commitments related to various projects. Payments for these commitments are expected to be as follows:

 

(In thousands)

 

2024

 

 

2025

 

 

2026

 

 

2027

 

 

2028

 

 

Thereafter

 

Other commitments

 

$

333

 

 

$

333

 

 

$

333

 

 

$

333

 

 

$

333

 

 

$

1,999