Note 1 - Nature of Operations and Going Concern

 

A. Nature of Operations

 

Zion Oil & Gas, Inc., a Delaware corporation (“we,” “our,” “Zion” or the “Company”) is an oil and gas exploration company with a history of 19 years of oil & gas exploration in Israel. As of December 31, 2018, the Company has no revenues from its oil and gas operations.

 

Zion maintains its corporate headquarters in Dallas, Texas. We also have branch offices in Caesarea, Israel and Geneva, Switzerland. The purpose of the Israel branch is to support the Company’s operations in Israel, and the purpose of the Switzerland branch is to operate a foreign treasury center for the Company.

 

Exploration Rights/Exploration Activities 

 

The Company currently holds one active petroleum exploration license onshore Israel, the Megiddo-Jezreel License, comprising approximately 99,000 acres. The Megiddo Jezreel #1 (“MJ #1”) exploratory well was spud on June 5, 2017 and drilled to a total depth (“TD”) of 5,060 meters (approximately 16,600 feet). Thereafter, the Company obtained three open-hole wireline log suites (including a formation image log) and the well was successfully cased and cemented. The Ministry of Energy approved the well testing protocol on April 29, 2018.

 

During the fourth quarter of 2018, the Company’s testing protocol was concluded at the MJ #1 well. The test results confirmed that the MJ #1 well did not contain hydrocarbons in commercial quantities in the zones tested. As a result of the above determination, in the year ended December 31, 2018, the Company recorded a non-cash impairment charge to its unproved oil and gas properties of $30,906,000.

 

The MJ#1 well provided Zion with information Zion believes is important for potential future exploration efforts within its license area. As with many frontier wildcat wells, the MJ#1 also left several questions unanswered.

 

While not meant to be an exhaustive list, a summary of what Zion believes to be key information learned in the MJ#1 well is as follows:

 

1.The MJ#1 encountered much higher subsurface temperatures at a depth shallower than expected before drilling the well. In our opinion, this is significant because reaching a minimum temperature threshold is necessary for the generation of hydrocarbons from an organic-rich source rock.

 

2.The known organic rich (potentially hydrocarbon bearing) Senonian age source rocks that are typically present in this part of Israel were not encountered as expected. Zion expected these source rocks to be encountered at approximately 1,000 meters in the MJ#1 well.

 

3.MJ#1 had natural fractures, permeability (the ability of fluid to move through the rock) and porosity (pore space in rock) that allowed the sustained flow of formation fluid in the shallower Jurassic and lower Cretaceous age formations between approximately 1,200 and 1,800 meters. While no hydrocarbons were encountered, Zion believes this fact is nonetheless significant because it provides important information about possible reservoir pressures and the ability of fluids to move within the formation and to the surface.

 

4.MJ#1 encountered oil in the Triassic Mohilla formation which Zion believes suggests an active deep petroleum system is in Zion’s license area. There was no natural permeability or porosity in the Triassic Mohilla formation to allow formation fluid to reach the surface naturally during testing and thus the MJ#1 was not producible or commercial.

  

5.The depths and thickness of the formations we encountered varied greatly from pre-drill estimates. This required the MJ#1 to be drilled to a much greater depth than previously expected. Zion has tied these revised formation depths to seismic data which will allow for more accurate interpretation and mapping in the future.

 

A summary of what Zion believes to be some key questions left to be answered are:

 

1.Is the missing shallow Senonian age source rock a result of regional erosion, or is it missing because of a fault that cut the well-bore and could be reasonably expected to be encountered in the vicinity of the MJ#1 drill site? Zion believes this is an important question to answer because if the Senonian source rocks do exist in this area, the high temperatures encountered are sufficient to mature these source rocks and generate oil.

 

2.Do the unusually high shallow subsurface temperatures extend regionally beyond the MJ#1 well, which could allow for the generation of hydrocarbons in the Senonian age source rock within our license area?

 

3.As a consequence of seismic remapping, where does the MJ#1 well lie relative to the potential traps at the Jurassic and Triassic levels and was the well location too low on the structures and deeper than the potential hydrocarbons within those traps?

 

As a result of these unanswered questions and with the information gained drilling the MJ#1 well, Zion now believes it is prudent and consistent with good industry practice to try and answer some of these questions with a focused 3D seismic imaging shoot of approximately 50 square kilometers surrounding the MJ#1 well.

 

Zion received a multi-year license extension through December 2, 2019. Zion made its annual license fee payment on December 31,2018, thereby confirming the Company’s commitment to further exploration in the license area. The Company has commenced preliminary scouting and survey design to help identify the geologic boundaries of the proposed 3D seismic survey. Additionally, Zion held initial meetings with potential vendors to aid in the 3D seismic planning and acquisition process. Once the survey design and surface layout are completed, Zion intends to acquire the necessary government permits and negotiate potential surface damages to crops, irrigation piping, and other surface features. Zion believes it will be necessary to import seismic source equipment and autonomous wireless geophones (to record the signal) to acquire the 3D data. Once data acquisition is completed, interpretation is the final step and will involve integration with, and modification of, previous work by Zion technical staff.

 

Zion’s ability to fully undertake all of these aforementioned activities is subject to its raising the needed capital from its continuing offerings, of which no assurance can be provided.

 

Megiddo-Jezreel Petroleum License (“MJL”)

 

The MJL was awarded on December 3, 2013 for a three-year primary term through December 2, 2016, with the possibility of additional one-year extensions up to a maximum of seven years. The MJL lies onshore, south and west of the Sea of Galilee, and the Company continues its exploration focus here as it appears to possess the key geologic ingredients of an active petroleum system with significant exploration potential. In late November 2016, The State of Israel’s Petroleum Commissioner officially approved Zion’s drilling date and license extension request.

 

On October 30, 2017, the Company sought a multi-year extension to its existing license. After receiving feedback from Israel’s Petroleum Commissioner, the Company submitted a revised extension request on November 9, 2017. On November 20, 2017, Israel’s Petroleum Commissioner officially approved Zion’s multi-year extension request on its Megiddo-Jezreel License No. 401, extending its validity to December 2, 2019. Until recently, the Company remained subject to the following updated key license terms: 

 

No.

 Activity Description Execution by:
1 Submit final report on the results of drilling 31 May 2018
2 Submit program for continuation of work under license 30 June 2018

 

On June 1, 2018, Zion submitted its Megiddo-Jezreel #1 End of Well Report (EOWR) for the Megiddo-Jezreel License No.  401, thus fulfilling its No. 1 Final Report license work plan obligation, shown above. 

 

On June 14, 2018 Zion submitted its Application for Extension of Continued Work Program Due Date on the Megiddo-Jezreel License No. 401.  The additional time was necessary because we had still not completed testing and evaluating all planned testing zones. On July 1, 2018, Israel’s Petroleum Commissioner granted Zion’s work program report extension to November 1, 2018, as shown below.

 

No.

 Activity Description Execution by:
1 Submit program for continuation of work under license 1 November 2018

  

On October 16, 2018 Zion submitted its Application for Extension of Continued Work Program Due Date on the Megiddo-Jezreel License No. 401.  The additional time was necessary because we had still not completed testing and evaluating all planned testing zones. On October 28, 2018, Israel’s Petroleum Commissioner granted Zion’s work program report extension to January 31, 2019, as shown below. 

 

No.

 Activity Description Execution by:
1 Submit program for continuation of work under license 31 January 2019

 

On January 31, 2019, Zion submitted its Application for Extension of Continued Work Program Due Date on the Megiddo-Jezreel License No. 401.  The additional time was necessary to finalize the work program. On February 3, 2019 Israel’s Petroleum Commissioner granted Zion’s work program report extension to February 28, 2019, as shown below:

 

 Number

 Activity Description Execution by:
3 Submit program for continuation of work under license 28 February  2019

 

As previously disclosed, the Company required authorization from the Israel Land Authority (the “ILA”), the formal lessor of the land to Kibbutz Sde Eliyahu, on whose property the drilling pad is currently situated, to access and utilize the drill site (“surface use agreement”). The Company received this authorization on July 4, 2016. This was preceded by the Company’s May 15, 2016 signed agreement with the kibbutz. On January 11, 2017, an agreement was signed by the Company and the ILA by which the surface usage permission agreement was extended through December 3, 2017. On December 31, 2017, an agreement was signed by the Company and the ILA by which the surface usage permission agreement was extended through December 3, 2019.

 

Zion’s Former Jordan Valley, Joseph, and Asher-Menashe Licenses

 

On March 29, 2015, the Energy Ministry formally approved the Company’s application to merge the southernmost portion of the Jordan Valley License into the Megiddo-Jezreel License. The Company has plugged all of its exploratory wells (in the former Joseph and Asher-Menashe Licenses) but acknowledges its obligation to complete the abandonment of these well sites in accordance with guidance from the Environmental Ministry and local officials (see note 10C). 

 

B. Going Concern 

 

The Company incurs cash outflows from operations and all exploration activities and overhead expenses to date have been financed by way of equity or debt financing. The recoverability of the costs incurred to date is uncertain and dependent upon achieving significant commercial production. 

 

The Company’s ability to continue as a going concern is dependent upon obtaining the necessary financing to undertake further exploration and development activities and ultimately generating profitable operations from its oil and natural gas interests in the future. The Company’s current operations are dependent upon the adequacy of its current assets to meet its current expenditure requirements and the accuracy of management’s estimates of those requirements. Should those estimates be materially incorrect, the Company’s ability to continue as a going concern may be impaired. The financial statements have been prepared on a going concern basis, which contemplates realization of assets and liquidation of liabilities in the ordinary course of business. During the year ended December 31, 2018, the Company incurred a net loss of approximately $38.5 million and had an accumulated deficit of approximately $199 million. These factors raise substantial doubt about the Company’s ability to continue as a going concern.

  

To carry out planned operations, the Company must raise additional funds through additional equity and/or debt issuances or through profitable operations. There can be no assurance that this capital or positive operational income will be available to the Company, and if it is not, the Company may be forced to curtail or cease exploration and development activities. The financial statements do not include any adjustments that might result from the outcome of this uncertainty (See also Note 13).