Commitments and Contingencies
3 Months Ended
Mar. 31, 2016
Commitments and Contingencies Disclosure [Abstract]  
Commitments and Contingencies
Commitments and Contingencies

Except to the extent noted below and in Note 5 above, the circumstances set forth in Notes 10, 11 and 12 to the consolidated financial statements included in the NSP-Minnesota Annual Report on Form 10-K for the year ended Dec. 31, 2015, appropriately represent, in all material respects, the current status of commitments and contingent liabilities, and are incorporated herein by reference. The following include commitments, contingencies and unresolved contingencies that are material to NSP-Minnesota’s financial position.

Purchased Power Agreements (PPAs)

Under certain PPAs, NSP-Minnesota purchases power from independent power producing entities for which NSP-Minnesota is required to reimburse natural gas or biomass fuel costs, or to participate in tolling arrangements under which NSP-Minnesota procures the natural gas required to produce the energy that it purchases. These specific PPAs create a variable interest in the associated independent power producing entity.

NSP-Minnesota had approximately 1,069 MW of capacity under long-term PPAs as of March 31, 2016 and Dec. 31, 2015, with entities that have been determined to be variable interest entities. NSP-Minnesota has concluded that these entities are not required to be consolidated in its consolidated financial statements because it does not have the power to direct the activities that most significantly impact the entities’ economic performance. These agreements have expiration dates through 2028.

Guarantees

Under NSP-Minnesota’s railcar lease agreement, accounted for as an operating lease, NSP-Minnesota guarantees the lessor proceeds from sale of the leased assets at the end of the lease term will at least equal the guaranteed residual value. The guarantee issued by NSP-Minnesota limits its exposure to a maximum amount stated in the guarantee; however, NSP-Minnesota expects sale proceeds to exceed the guaranteed amount. This lease agreement expires in 2019.

The following table presents the guarantee issued and outstanding for NSP-Minnesota:
(Millions of Dollars)
 
March 31, 2016
 
Dec. 31, 2015
Guarantee issued and outstanding
 
$
4.8

 
$
4.8



Environmental Loss Contingency Disclosure [Text Block]
Environmental Contingencies

Fargo, N.D. Manufactured Gas Plant (MGP) Site — In May 2015, underground pipes, tars and impacted soils were discovered in Fargo, N.D., which may be related to a former MGP site operated by NSP-Minnesota or a prior company. NSP-Minnesota has removed the impacted soils and other materials from the project area. NSP-Minnesota is undertaking further investigation of the location of the historic MGP site and nearby properties. In October 2015, NSP-Minnesota initiated insurance recovery litigation in North Dakota. The U.S. District Court for the District of North Dakota agreed to the parties’ request for a stay of the litigation until July 2016 to allow NSP-Minnesota time to further investigate site conditions.

As of March 31, 2016 and Dec. 31, 2015, NSP-Minnesota had recorded a liability of $2.2 million and $2.7 million, respectively, related to further investigation and additional planned activities. Uncertainties include the nature and cost of the additional remediation efforts that may be necessary, the ability to recover costs from insurance carriers and the potential for contributions from entities that may be identified as PRPs. Therefore, the total cost of remediation, NSP-Minnesota’s potential liability and amounts allocable to the North Dakota and Minnesota jurisdictions related to the site cannot currently be reasonably estimated. In December 2015, the NDPSC approved NSP-Minnesota’s request to defer the portion of investigation and response costs allocable to the North Dakota jurisdiction.

Environmental Requirements

Air
Regional Haze Rules — The regional haze program is designed to address widespread haze that results from emissions from a multitude of sources. In 2005, the United States Environmental Protection Agency (EPA) amended the best available retrofit technology (BART) requirements of its regional haze rules, which require the installation and operation of emission controls for industrial facilities emitting air pollutants that reduce visibility in certain national parks and wilderness areas. In its first regional haze state implementation plan (SIP), Minnesota identified the NSP-Minnesota facilities that will have to reduce sulfur dioxide (SO2), nitrous oxide (NOx) and particulate matter (PM) emissions under BART and set emissions limits for those facilities.

In 2009, the Minnesota Pollution Control Agency (MPCA) approved a SIP and submitted it to the EPA for approval. The MPCA’s source-specific BART limits for Sherco Units 1 and 2 require combustion controls for NOx and scrubber upgrades for SO2. The MPCA supplemented its SIP in 2012, determining that the Cross-State Air Pollution Rule (CSAPR) meets BART requirements, but also implementing its source-specific BART determination for Sherco Units 1 and 2 from the 2009 Minnesota SIP. In June 2012, the EPA approved the SIP for electric generating units and also approved the source-specific emission limits for Sherco Units 1 and 2. The combustion controls were installed first and the scrubber upgrades were completed in December 2014, at a cost of $46.9 million. NSP-Minnesota has included these costs for recovery in rate proceedings.

In August 2012, the National Parks Conservation Association, Sierra Club, Voyageurs National Park Association, Friends of the Boundary Waters Wilderness, Minnesota Center for Environmental Advocacy and Fresh Energy appealed the EPA’s approval of the Minnesota SIP to the U.S. Court of Appeals for the Eighth Circuit (Eighth Circuit). In January 2016, the Eighth Circuit issued their opinion which upheld the EPA’s approval of the SIP. In March 2016, after granting a rehearing request, the Eighth Circuit issued a revised opinion that included additional explanation and continued to uphold the EPA’s approval of the SIP.

Reasonably Attributable Visibility Impairment (RAVI) — RAVI is intended to address observable impairment from a specific source such as distinct, identifiable plumes from a source’s stack to a national park. In 2009, the United States Department of the Interior certified that a portion of the visibility impairment in Voyageurs and Isle Royale National Parks is reasonably attributable to emissions from NSP-Minnesota’s Sherco Units 1 and 2.

In December 2012, a lawsuit against the EPA was filed in the U.S. District Court for the District of Minnesota (Minnesota District Court) by the following organizations: National Parks Conservation Association, Minnesota Center for Environmental Advocacy, Friends of the Boundary Waters Wilderness, Voyageurs National Park Association, Fresh Energy and Sierra Club.

In May 2015, NSP-Minnesota, the EPA and the six environmental advocacy organizations filed a settlement agreement in the Minnesota District Court.  The agreement anticipates a federal rulemaking that would impose stricter SO2 emission limits on Sherco Units 1, 2 and 3, without making a RAVI attribution finding or a RAVI BART determination.  The emission limits for Units 1 and 2 reflect the success of a recently completed control project. The Unit 3 emission limits will be met through changes in the operation of the existing scrubber.  The Minnesota District Court issued an order staying the litigation for the time needed to complete the actions required by the settlement agreement.  The plaintiffs agreed to withdraw their complaint with prejudice when those actions are completed.  Plaintiffs also agreed not to request a RAVI certification for Sherco Units 1, 2 and/or 3 in the future.

In March 2016, the EPA adopted a final rule which set the agreed-upon SO2 emission limits.  As a result, the Minnesota District Court dismissed the litigation with prejudice in March 2016. NSP-Minnesota does not anticipate the costs of compliance with the final rule will have a material impact on the results of operations, financial position or cash flows.

Implementation of the National Ambient Air Quality Standard (NAAQS) for SO2 — The EPA adopted a more stringent NAAQS for SO2 in 2010. In 2013, the EPA designated areas as not attaining the revised NAAQS, which did not include any areas where NSP-Minnesota operates power plants.  However, many other areas of the country were unable to be classified by the EPA due to a lack of air monitors.

Following a lawsuit alleging that the EPA had not completed its area designations in the time required by the Clean Air Act and under a consent decree the EPA is requiring states to evaluate areas in three phases. If an area is designated as nonattainment, the respective states will need to evaluate all SO2 sources in the area. The state would then submit an implementation plan, which would be due in 18 months, designed to achieve the NAAQS within five years. It is anticipated the areas near NSP-Minnesota’s power plants will be evaluated in the next designation phase, ending December 2017. NSP-Minnesota’s King and Sherco plants already utilize scrubbers to control SO2 emissions. NSP-Minnesota cannot evaluate the impacts until the designation of nonattainment areas is made and any required state plans are developed. NSP-Minnesota believes that, should SO2 control system costs be required for a plant, compliance costs will be recoverable through regulatory mechanisms and therefore does not expect a material impact on results of operations, financial position or cash flows.
Legal Matters and Contingencies
Legal Contingencies

NSP-Minnesota is involved in various litigation matters that are being defended and handled in the ordinary course of business. The assessment of whether a loss is probable or is a reasonable possibility, and whether the loss or a range of loss is estimable, often involves a series of complex judgments about future events. Management maintains accruals for such losses that are probable of being incurred and subject to reasonable estimation. Management is sometimes unable to estimate an amount or range of a reasonably possible loss in certain situations, including but not limited to when (1) the damages sought are indeterminate, (2) the proceedings are in the early stages, or (3) the matters involve novel or unsettled legal theories. In such cases, there is considerable uncertainty regarding the timing or ultimate resolution of such matters, including a possible eventual loss. For current proceedings not specifically reported herein, management does not anticipate that the ultimate liabilities, if any, arising from such current proceedings would have a material effect on NSP-Minnesota’s financial statements. Unless otherwise required by GAAP, legal fees are expensed as incurred.