XML 140 R124.htm IDEA: XBRL DOCUMENT v3.8.0.1
Schedule III Real Estate and Accumulated Depreciation - Real Estate and Accumulated Depreciation, by Property (Detail) - USD ($)
Dec. 31, 2017
Dec. 31, 2016
Dec. 31, 2015
Dec. 31, 2014
Initial Costs to Company        
Encumbrances $ 30,310,000      
Land 298,830,000      
Buildings and Improvements 3,058,446,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 124,706,000      
Buildings and Improvements 9,465,753,000      
Total Costs        
Land 423,536,000      
Buildings and Improvements 12,524,199,000      
Accumulated Depreciation (3,980,198,000) $ (3,175,972,000) $ (2,595,648,000) $ (2,242,345,000)
Taxable basis in aggregate initial cost 17,901,900,000      
Operating Lease [Member]        
Total Costs        
Initial cost 0      
Americas | AT1 ATLANTA (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 123,655,000      
Total Costs        
Land 0      
Buildings and Improvements 123,655,000      
Accumulated Depreciation (42,278,000)      
Americas | AT2 ATLANTA (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 42,574,000      
Total Costs        
Land 0      
Buildings and Improvements 42,574,000      
Accumulated Depreciation (20,048,000)      
Americas | AT3 ATLANTA (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 4,095,000      
Total Costs        
Land 0      
Buildings and Improvements 4,095,000      
Accumulated Depreciation (1,678,000)      
Americas | AT4 ATLANTA (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 5,400,000      
Buildings and Improvements 20,209,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 1,823,000      
Total Costs        
Land 5,400,000      
Buildings and Improvements 22,032,000      
Accumulated Depreciation (2,955,000)      
Americas | AT5 ATLANTA (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 5,011,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 1,552,000      
Total Costs        
Land 0      
Buildings and Improvements 6,563,000      
Accumulated Depreciation (1,029,000)      
Americas | BG1 BOGOTÁ (METRO), COLOMBIA        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 8,779,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 409,000      
Total Costs        
Land 0      
Buildings and Improvements 9,188,000      
Accumulated Depreciation (769,000)      
Americas | BO1 BOSTON (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 11,185,000      
Total Costs        
Land 0      
Buildings and Improvements 11,185,000      
Accumulated Depreciation (6,713,000)      
Americas | BO2 BOSTON (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 2,500,000      
Buildings and Improvements 30,383,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 214,000      
Total Costs        
Land 2,500,000      
Buildings and Improvements 30,597,000      
Accumulated Depreciation (2,917,000)      
Americas | CH1 CHICAGO (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 161,324,000      
Total Costs        
Land 0      
Buildings and Improvements 161,324,000      
Accumulated Depreciation (103,562,000)      
Americas | CH2 CHICAGO (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 108,257,000      
Total Costs        
Land 0      
Buildings and Improvements 108,257,000      
Accumulated Depreciation (53,744,000)      
Americas | CH3 CHICAGO (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 9,759,000      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 351,000      
Buildings and Improvements 279,869,000      
Total Costs        
Land 10,110,000      
Buildings and Improvements 279,869,000      
Accumulated Depreciation (99,791,000)      
Americas | CH4 CHICAGO (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 21,976,000      
Total Costs        
Land 0      
Buildings and Improvements 21,976,000      
Accumulated Depreciation (9,792,000)      
Americas | CH7 CHICAGO (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 670,000      
Buildings and Improvements 10,564,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 88,000      
Total Costs        
Land 670,000      
Buildings and Improvements 10,652,000      
Accumulated Depreciation (1,046,000)      
Americas | CU1 CULPEPER (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 1,019,000      
Buildings and Improvements 37,581,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 311,000      
Total Costs        
Land 1,019,000      
Buildings and Improvements 37,892,000      
Accumulated Depreciation (2,788,000)      
Americas | CU2 CULPEPER (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 1,244,000      
Buildings and Improvements 48,000,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 367,000      
Total Costs        
Land 1,244,000      
Buildings and Improvements 48,367,000      
Accumulated Depreciation (3,254,000)      
Americas | CU3 CULPEPER (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 1,088,000      
Buildings and Improvements 37,387,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 54,000      
Total Costs        
Land 1,088,000      
Buildings and Improvements 37,441,000      
Accumulated Depreciation (2,437,000)      
Americas | CU4 CULPEPER (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 1,372,000      
Buildings and Improvements 27,832,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 1,963,000      
Total Costs        
Land 1,372,000      
Buildings and Improvements 29,795,000      
Accumulated Depreciation (1,285,000)      
Americas | DA1 DALLAS (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 74,900,000      
Total Costs        
Land 0      
Buildings and Improvements 74,900,000      
Accumulated Depreciation (48,583,000)      
Americas | DA2 DALLAS (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 78,659,000      
Total Costs        
Land 0      
Buildings and Improvements 78,659,000      
Accumulated Depreciation (21,955,000)      
Americas | DA3 DALLAS (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 92,408,000      
Total Costs        
Land 0      
Buildings and Improvements 92,408,000      
Accumulated Depreciation (30,450,000)      
Americas | DA4 DALLAS (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 18,010,000      
Total Costs        
Land 0      
Buildings and Improvements 18,010,000      
Accumulated Depreciation (8,616,000)      
Americas | DA6 DALLAS (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 20,522,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 110,282,000      
Total Costs        
Land 0      
Buildings and Improvements 130,804,000      
Accumulated Depreciation (16,735,000)      
Americas | DA7 DALLAS (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 26,888,000      
Total Costs        
Land 0      
Buildings and Improvements 26,888,000      
Accumulated Depreciation (4,964,000)      
Americas | DA9 DALLAS (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 610,000      
Buildings and Improvements 15,398,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 89,000      
Total Costs        
Land 610,000      
Buildings and Improvements 15,487,000      
Accumulated Depreciation (1,191,000)      
Americas | DA10 DALLAS (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 117,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 4,535,000      
Total Costs        
Land 0      
Buildings and Improvements 4,652,000      
Accumulated Depreciation (349,000)      
Americas | DC1 WASHINGTON, DC (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 2,435,000      
Total Costs        
Land 0      
Buildings and Improvements 2,435,000      
Accumulated Depreciation (574,000)      
Americas | DC2 WASHINGTON, DC (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 5,047,000      
Buildings and Improvements 158,709,000      
Total Costs        
Land 5,047,000      
Buildings and Improvements 158,709,000      
Accumulated Depreciation (128,668,000)      
Americas | DC3 WASHINGTON, DC (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 37,451,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 53,210,000      
Total Costs        
Land 0      
Buildings and Improvements 90,661,000      
Accumulated Depreciation (49,386,000)      
Americas | DC4 WASHINGTON, DC (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 1,906,000      
Buildings and Improvements 7,272,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 72,961,000      
Total Costs        
Land 1,906,000      
Buildings and Improvements 80,233,000      
Accumulated Depreciation (49,250,000)      
Americas | DC5 WASHINGTON, DC (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 1,429,000      
Buildings and Improvements 4,983,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 89,024,000      
Total Costs        
Land 1,429,000      
Buildings and Improvements 94,007,000      
Accumulated Depreciation (57,411,000)      
Americas | DC6 WASHINGTON, DC (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 1,429,000      
Buildings and Improvements 5,082,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 87,709,000      
Total Costs        
Land 1,429,000      
Buildings and Improvements 92,791,000      
Accumulated Depreciation (39,873,000)      
Americas | DC7 WASHINGTON, DC (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 20,851,000      
Total Costs        
Land 0      
Buildings and Improvements 20,851,000      
Accumulated Depreciation (11,503,000)      
Americas | DC8 WASHINGTON, DC (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 5,185,000      
Total Costs        
Land 0      
Buildings and Improvements 5,185,000      
Accumulated Depreciation (4,739,000)      
Americas | DC10 WASHINGTON, DC (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 44,601,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 71,706,000      
Total Costs        
Land 0      
Buildings and Improvements 116,307,000      
Accumulated Depreciation (41,225,000)      
Americas | DC11 WASHINGTON, DC (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 1,429,000      
Buildings and Improvements 5,082,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 175,361,000      
Total Costs        
Land 1,429,000      
Buildings and Improvements 180,443,000      
Accumulated Depreciation (30,071,000)      
Americas | DC12 WASHINGTON, DC (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 101,783,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 19,101,000      
Total Costs        
Land 0      
Buildings and Improvements 120,884,000      
Accumulated Depreciation (1,869,000)      
Americas | DC13 WASHINGTON, DC (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 5,500,000      
Buildings and Improvements 25,423,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 364,000      
Total Costs        
Land 5,500,000      
Buildings and Improvements 25,787,000      
Accumulated Depreciation (3,015,000)      
Americas | DC14 WASHINGTON, DC (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 2,560,000      
Buildings and Improvements 33,511,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 206,000      
Total Costs        
Land 2,560,000      
Buildings and Improvements 33,717,000      
Accumulated Depreciation (2,330,000)      
Americas | DC97 WASHINGTON, DC (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 2,021,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 141,000      
Total Costs        
Land 0      
Buildings and Improvements 2,162,000      
Accumulated Depreciation (259,000)      
Americas | DE1 DENVER (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 10,260,000      
Total Costs        
Land 0      
Buildings and Improvements 10,260,000      
Accumulated Depreciation (7,172,000)      
Americas | DE2 DENVER (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 5,240,000      
Buildings and Improvements 23,053,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 14,764,000      
Total Costs        
Land 5,240,000      
Buildings and Improvements 37,817,000      
Accumulated Depreciation (3,814,000)      
Americas | HO1 HOUSTON (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 1,440,000      
Buildings and Improvements 23,780,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 3,996,000      
Total Costs        
Land 1,440,000      
Buildings and Improvements 27,776,000      
Accumulated Depreciation (2,679,000)      
Americas | LA1 LOS ANGELES (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 112,209,000      
Total Costs        
Land 0      
Buildings and Improvements 112,209,000      
Accumulated Depreciation (64,914,000)      
Americas | LA2 LOS ANGELES (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 11,066,000      
Total Costs        
Land 0      
Buildings and Improvements 11,066,000      
Accumulated Depreciation (8,887,000)      
Americas | LA3 LOS ANGELES (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 34,727,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 3,959,000      
Buildings and Improvements 24,296,000      
Total Costs        
Land 3,959,000      
Buildings and Improvements 59,023,000      
Accumulated Depreciation (45,521,000)      
Americas | LA4 LOS ANGELES (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 19,333,000      
Buildings and Improvements 137,630,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 29,032,000      
Total Costs        
Land 19,333,000      
Buildings and Improvements 166,662,000      
Accumulated Depreciation (68,944,000)      
Americas | LA7 LOS ANGELES (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 7,800,000      
Buildings and Improvements 33,621,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 124,000      
Total Costs        
Land 7,800,000      
Buildings and Improvements 33,745,000      
Accumulated Depreciation (2,544,000)      
Americas | MI1 MIAMI (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 18,920,000      
Buildings and Improvements 127,194,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 31,502,000      
Total Costs        
Land 18,920,000      
Buildings and Improvements 158,696,000      
Accumulated Depreciation (11,253,000)      
Americas | MI2 MIAMI (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 25,776,000      
Total Costs        
Land 0      
Buildings and Improvements 25,776,000      
Accumulated Depreciation (11,815,000)      
Americas | MI3 MIAMI (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 31,148,000      
Total Costs        
Land 0      
Buildings and Improvements 31,148,000      
Accumulated Depreciation (10,329,000)      
Americas | MI6 MIAMI (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 4,750,000      
Buildings and Improvements 23,017,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 1,538,000      
Total Costs        
Land 4,750,000      
Buildings and Improvements 24,555,000      
Accumulated Depreciation (2,231,000)      
Americas | NY1 NEW YORK (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 80,528,000      
Total Costs        
Land 0      
Buildings and Improvements 80,528,000      
Accumulated Depreciation (45,712,000)      
Americas | NY2 NEW YORK (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 17,859,000      
Buildings and Improvements 199,508,000      
Total Costs        
Land 17,859,000      
Buildings and Improvements 199,508,000      
Accumulated Depreciation (125,823,000)      
Americas | NY4 NEW YORK (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 338,384,000      
Total Costs        
Land 0      
Buildings and Improvements 338,384,000      
Accumulated Depreciation (167,338,000)      
Americas | NY5 NEW YORK (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 254,899,000      
Total Costs        
Land 0      
Buildings and Improvements 254,899,000      
Accumulated Depreciation (50,791,000)      
Americas | NY6 NEW YORK (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 73,350,000      
Total Costs        
Land 0      
Buildings and Improvements 73,350,000      
Accumulated Depreciation (8,658,000)      
Americas | NY7 NEW YORK (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 24,660,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 146,688,000      
Total Costs        
Land 0      
Buildings and Improvements 171,348,000      
Accumulated Depreciation (101,925,000)      
Americas | NY8 NEW YORK (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 12,188,000      
Total Costs        
Land 0      
Buildings and Improvements 12,188,000      
Accumulated Depreciation (7,195,000)      
Americas | NY9 NEW YORK (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 54,514,000      
Total Costs        
Land 0      
Buildings and Improvements 54,514,000      
Accumulated Depreciation (31,583,000)      
Americas | NY11 NEW YORK (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 2,050,000      
Buildings and Improvements 58,717,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 3,086,000      
Total Costs        
Land 2,050,000      
Buildings and Improvements 61,803,000      
Accumulated Depreciation (4,707,000)      
Americas | NY12 NEW YORK (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 3,460,000      
Buildings and Improvements 10,380,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 1,571,000      
Total Costs        
Land 3,460,000      
Buildings and Improvements 11,951,000      
Accumulated Depreciation (942,000)      
Americas | NY13 NEW YORK (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 31,603,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 1,527,000      
Total Costs        
Land 0      
Buildings and Improvements 33,130,000      
Accumulated Depreciation (2,829,000)      
Americas | PH1 PHILADELPHIA (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 43,862,000      
Total Costs        
Land 0      
Buildings and Improvements 43,862,000      
Accumulated Depreciation (12,765,000)      
Americas | RJ1 RIO DE JANEIRO (METRO), BRAZIL        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 23,297,000      
Total Costs        
Land 0      
Buildings and Improvements 23,297,000      
Accumulated Depreciation (16,898,000)      
Americas | RJ2 RIO DE JANEIRO (METRO), BRAZIL        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 2,012,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 1,986,000      
Buildings and Improvements 53,635,000      
Total Costs        
Land 1,986,000      
Buildings and Improvements 55,647,000      
Accumulated Depreciation (13,460,000)      
Americas | SE2 SEATTLE (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 30,282,000      
Total Costs        
Land 0      
Buildings and Improvements 30,282,000      
Accumulated Depreciation (23,003,000)      
Americas | SE3 SEATTLE (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 1,760,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 95,706,000      
Total Costs        
Land 0      
Buildings and Improvements 97,466,000      
Accumulated Depreciation (28,649,000)      
Americas | SE4 SEATTLE (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 4,000,000      
Buildings and Improvements 12,903,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements (112,000)      
Total Costs        
Land 4,000,000      
Buildings and Improvements 12,791,000      
Accumulated Depreciation (1,669,000)      
Americas | SP1 SÃO PAULO (METRO), BRAZIL        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 10,188,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 24,862,000      
Total Costs        
Land 0      
Buildings and Improvements 35,050,000      
Accumulated Depreciation (21,485,000)      
Americas | SP2 SÃO PAULO (METRO), BRAZIL        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 85,948,000      
Total Costs        
Land 0      
Buildings and Improvements 85,948,000      
Accumulated Depreciation (46,937,000)      
Americas | SP3 SÃO PAULO (METRO), BRAZIL        
Initial Costs to Company        
Encumbrances 0      
Land 12,148,000      
Buildings and Improvements 72,997,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 8,208,000      
Total Costs        
Land 12,148,000      
Buildings and Improvements 81,205,000      
Accumulated Depreciation (5,011,000)      
Americas | SP4 SÃO PAULO (METRO), BRAZIL        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 24,633,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 1,572,000      
Total Costs        
Land 0      
Buildings and Improvements 26,205,000      
Accumulated Depreciation (2,810,000)      
Americas | SV1 SILICON VALLEY (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 15,545,000      
Buildings and Improvements 162,162,000      
Total Costs        
Land 15,545,000      
Buildings and Improvements 162,162,000      
Accumulated Depreciation (108,646,000)      
Americas | SV2 SILICON VALLEY (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 150,653,000      
Total Costs        
Land 0      
Buildings and Improvements 150,653,000      
Accumulated Depreciation (76,489,000)      
Americas | SV3 SILICON VALLEY (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 45,592,000      
Total Costs        
Land 0      
Buildings and Improvements 45,592,000      
Accumulated Depreciation (40,301,000)      
Americas | SV4 SILICON VALLEY (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 27,184,000      
Total Costs        
Land 0      
Buildings and Improvements 27,184,000      
Accumulated Depreciation (20,935,000)      
Americas | SV5 SILICON VALLEY (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 6,238,000      
Buildings and Improvements 98,991,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 90,853,000      
Total Costs        
Land 6,238,000      
Buildings and Improvements 189,844,000      
Accumulated Depreciation (53,708,000)      
Americas | SV6 SILICON VALLEY (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 15,585,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 22,785,000      
Total Costs        
Land 0      
Buildings and Improvements 38,370,000      
Accumulated Depreciation (25,454,000)      
Americas | SV8 SILICON VALLEY (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 50,520,000      
Total Costs        
Land 0      
Buildings and Improvements 50,520,000      
Accumulated Depreciation (26,134,000)      
Americas | SV10 SILICON VALLEY (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 12,646,000      
Buildings and Improvements 123,594,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 6,939,000      
Total Costs        
Land 12,646,000      
Buildings and Improvements 130,533,000      
Accumulated Depreciation (2,816,000)      
Americas | SV12 SILICON VALLEY (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 20,313,000      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 2,340,000      
Total Costs        
Land 20,313,000      
Buildings and Improvements 2,340,000      
Accumulated Depreciation 0      
Americas | SV13 SILICON VALLEY (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 3,828,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 52,000      
Total Costs        
Land 0      
Buildings and Improvements 3,880,000      
Accumulated Depreciation (635,000)      
Americas | SV14 SILICON VALLEY (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 3,638,000      
Buildings and Improvements 5,503,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 181,000      
Total Costs        
Land 3,638,000      
Buildings and Improvements 5,684,000      
Accumulated Depreciation (361,000)      
Americas | SV15 SILICON VALLEY (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 7,651,000      
Buildings and Improvements 23,060,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 72,000      
Total Costs        
Land 7,651,000      
Buildings and Improvements 23,132,000      
Accumulated Depreciation (1,605,000)      
Americas | SV16 SILICON VALLEY (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 4,271,000      
Buildings and Improvements 15,018,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 274,000      
Total Costs        
Land 4,271,000      
Buildings and Improvements 15,292,000      
Accumulated Depreciation (1,201,000)      
Americas | SV17 SILICON VALLEY (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 17,493,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 526,000      
Total Costs        
Land 0      
Buildings and Improvements 18,019,000      
Accumulated Depreciation (2,906,000)      
Americas | TR1 TORONTO (METRO), CANADA        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 96,425,000      
Total Costs        
Land 0      
Buildings and Improvements 96,425,000      
Accumulated Depreciation (25,161,000)      
Americas | TR2 TORONTO (METRO), CANADA        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 21,113,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 101,996,000      
Total Costs        
Land 0      
Buildings and Improvements 123,109,000      
Accumulated Depreciation (12,821,000)      
Americas | OTHERS        
Initial Costs to Company        
Encumbrances 0      
Land 70,803,000      
Buildings and Improvements 19,365,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 8,408,000      
Total Costs        
Land 70,803,000      
Buildings and Improvements 27,773,000      
Accumulated Depreciation (4,085,000)      
EMEA | AD1 ABU DHABI (METRO), UNITED ARAB EMIRATES        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 387,000      
Total Costs        
Land 0      
Buildings and Improvements 387,000      
Accumulated Depreciation (45,000)      
EMEA | AM1 AMSTERDAM (METRO), THE NETHERLANDS        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 88,460,000      
Total Costs        
Land 0      
Buildings and Improvements 88,460,000      
Accumulated Depreciation (33,378,000)      
EMEA | AM2 AMSTERDAM (METRO), THE NETHERLANDS        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 75,488,000      
Total Costs        
Land 0      
Buildings and Improvements 75,488,000      
Accumulated Depreciation (24,556,000)      
EMEA | AM3 AMSTERDAM (METRO), THE NETHERLANDS        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 27,099,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 124,113,000      
Total Costs        
Land 0      
Buildings and Improvements 151,212,000      
Accumulated Depreciation (36,011,000)      
EMEA | AM4 AMSTERDAM (METRO), THE NETHERLANDS        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 119,113,000      
Total Costs        
Land 0      
Buildings and Improvements 119,113,000      
Accumulated Depreciation (1,087,000)      
EMEA | AM5 AMSTERDAM (METRO), THE NETHERLANDS        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 92,199,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 17,650,000      
Total Costs        
Land 0      
Buildings and Improvements 109,849,000      
Accumulated Depreciation (13,629,000)      
EMEA | AM6 AMSTERDAM (METRO), THE NETHERLANDS        
Initial Costs to Company        
Encumbrances 0      
Land 6,616,000      
Buildings and Improvements 50,876,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 933,000      
Buildings and Improvements 59,412,000      
Total Costs        
Land 7,549,000      
Buildings and Improvements 110,288,000      
Accumulated Depreciation (6,985,000)      
EMEA | AM7 AMSTERDAM (METRO), THE NETHERLANDS        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 7,397,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 8,528,000      
Total Costs        
Land 0      
Buildings and Improvements 15,925,000      
Accumulated Depreciation (1,699,000)      
EMEA | AM8 AMSTERDAM (METRO), THE NETHERLANDS        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 10,657,000      
Total Costs        
Land 0      
Buildings and Improvements 10,657,000      
Accumulated Depreciation (2,670,000)      
EMEA | BA1 BARCELONA (METRO), SPAIN        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 9,443,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 290,000      
Total Costs        
Land 0      
Buildings and Improvements 9,733,000      
Accumulated Depreciation (256,000)      
EMEA | DB1 DUBLIN (METRO), IRELAND        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 3,080,000      
Total Costs        
Land 0      
Buildings and Improvements 3,080,000      
Accumulated Depreciation (731,000)      
EMEA | DB2 DUBLIN (METRO), IRELAND        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 12,460,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 3,032,000      
Total Costs        
Land 0      
Buildings and Improvements 15,492,000      
Accumulated Depreciation (3,543,000)      
EMEA | DB3 DUBLIN (METRO), IRELAND        
Initial Costs to Company        
Encumbrances 0      
Land 3,334,000      
Buildings and Improvements 54,387,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 470,000      
Buildings and Improvements 18,163,000      
Total Costs        
Land 3,804,000      
Buildings and Improvements 72,550,000      
Accumulated Depreciation (7,754,000)      
EMEA | DB4 DUBLIN (METRO), IRELAND        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 26,875,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 17,297,000      
Total Costs        
Land 0      
Buildings and Improvements 44,172,000      
Accumulated Depreciation (3,307,000)      
EMEA | DU1 DÜSSELDORF (METRO), GERMANY        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 8,644,000      
Buildings and Improvements 33,567,000      
Total Costs        
Land 8,644,000      
Buildings and Improvements 33,567,000      
Accumulated Depreciation (21,137,000)      
EMEA | DX1 DUBAI (METRO), UNITED ARAB EMIRATES        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 84,493,000      
Total Costs        
Land 0      
Buildings and Improvements 84,493,000      
Accumulated Depreciation (8,695,000)      
EMEA | DX2 DUBAI (METRO), UNITED ARAB EMIRATES        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 2,594,000      
Total Costs        
Land 0      
Buildings and Improvements 2,594,000      
Accumulated Depreciation (11,000)      
EMEA | EN1 ENSCHEDE (METRO), THE NETHERLANDS        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 29,382,000      
Total Costs        
Land 0      
Buildings and Improvements 29,382,000      
Accumulated Depreciation (17,764,000)      
EMEA | FR1 FRANKFURT (METRO), GERMANY        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 7,615,000      
Total Costs        
Land 0      
Buildings and Improvements 7,615,000      
Accumulated Depreciation (7,371,000)      
EMEA | FR2 FRANKFURT (METRO), GERMANY        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 13,132,000      
Buildings and Improvements 335,573,000      
Total Costs        
Land 13,132,000      
Buildings and Improvements 335,573,000      
Accumulated Depreciation (99,648,000)      
EMEA | FR3 FRANKFURT (METRO), GERMANY        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 1,172,000      
Total Costs        
Land 0      
Buildings and Improvements 1,172,000      
Accumulated Depreciation (1,157,000)      
EMEA | FR4 FRANKFURT (METRO), GERMANY        
Initial Costs to Company        
Encumbrances 0      
Land 11,578,000      
Buildings and Improvements 9,307,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 1,633,000      
Buildings and Improvements 74,071,000      
Total Costs        
Land 13,211,000      
Buildings and Improvements 83,378,000      
Accumulated Depreciation (21,689,000)      
EMEA | FR5 FRANKFURT (METRO), GERMANY        
Initial Costs to Company        
Encumbrances 30,310,000      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 4,240,000      
Buildings and Improvements 148,382,000      
Total Costs        
Land 4,240,000      
Buildings and Improvements 148,382,000      
Accumulated Depreciation (30,480,000)      
EMEA | FR6 FRANKFURT (METRO), GERMANY        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 106,231,000      
Total Costs        
Land 0      
Buildings and Improvements 106,231,000      
Accumulated Depreciation (2,336,000)      
EMEA | FR7 FRANKFURT (METRO), GERMANY        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 43,634,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 12,865,000      
Total Costs        
Land 0      
Buildings and Improvements 56,499,000      
Accumulated Depreciation (8,816,000)      
EMEA | GV1 GENEVA (METRO), SWITZERLAND        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 7,493,000      
Total Costs        
Land 0      
Buildings and Improvements 7,493,000      
Accumulated Depreciation (4,625,000)      
EMEA | GV2 GENEVA (METRO), SWITZERLAND        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 23,250,000      
Total Costs        
Land 0      
Buildings and Improvements 23,250,000      
Accumulated Depreciation (17,044,000)      
EMEA | HE1 HELSINKI (METRO), FINLAND        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 3,626,000      
Total Costs        
Land 0      
Buildings and Improvements 3,626,000      
Accumulated Depreciation (1,362,000)      
EMEA | HE2 HELSINKI (METRO), FINLAND        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 1,638,000      
Total Costs        
Land 0      
Buildings and Improvements 1,638,000      
Accumulated Depreciation (1,023,000)      
EMEA | HE3 HELSINKI (METRO), FINLAND        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 11,758,000      
Total Costs        
Land 0      
Buildings and Improvements 11,758,000      
Accumulated Depreciation (4,971,000)      
EMEA | HE4 HELSINKI (METRO), FINLAND        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 29,092,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 8,007,000      
Total Costs        
Land 0      
Buildings and Improvements 37,099,000      
Accumulated Depreciation (6,697,000)      
EMEA | HE5 HELSINKI (METRO), FINLAND        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 7,564,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 1,233,000      
Total Costs        
Land 0      
Buildings and Improvements 8,797,000      
Accumulated Depreciation (2,358,000)      
EMEA | HE6 HELSINKI (METRO), FINLAND        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 17,204,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 1,791,000      
Buildings and Improvements 25,836,000      
Total Costs        
Land 1,791,000      
Buildings and Improvements 43,040,000      
Accumulated Depreciation (2,717,000)      
EMEA | IS1 ISTANBUL (METRO), TURKEY        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 8,166,000      
Total Costs        
Land 0      
Buildings and Improvements 8,166,000      
Accumulated Depreciation (4,042,000)      
EMEA | IS2 ISTANBUL (METRO), TURKEY        
Initial Costs to Company        
Encumbrances 0      
Land 14,460,000      
Buildings and Improvements 39,289,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 1,332,000      
Total Costs        
Land 14,460,000      
Buildings and Improvements 40,621,000      
Accumulated Depreciation (298,000)      
EMEA | LD3 LONDON (METRO), UNITED KINGDOM        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 16,526,000      
Total Costs        
Land 0      
Buildings and Improvements 16,526,000      
Accumulated Depreciation (11,886,000)      
EMEA | LD4 LONDON (METRO), UNITED KINGDOM        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 23,044,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 69,365,000      
Total Costs        
Land 0      
Buildings and Improvements 92,409,000      
Accumulated Depreciation (39,185,000)      
EMEA | LD5 LONDON (METRO), UNITED KINGDOM        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 16,412,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 183,250,000      
Total Costs        
Land 0      
Buildings and Improvements 199,662,000      
Accumulated Depreciation (68,682,000)      
EMEA | LD6 LONDON (METRO), UNITED KINGDOM        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 121,069,000      
Total Costs        
Land 0      
Buildings and Improvements 121,069,000      
Accumulated Depreciation (12,525,000)      
EMEA | LD8 LONDON (METRO), UNITED KINGDOM        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 107,544,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 18,577,000      
Total Costs        
Land 0      
Buildings and Improvements 126,121,000      
Accumulated Depreciation (15,891,000)      
EMEA | LD9 LONDON (METRO), UNITED KINGDOM        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 181,431,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 32,756,000      
Total Costs        
Land 0      
Buildings and Improvements 214,187,000      
Accumulated Depreciation (26,163,000)      
EMEA | LD10 LONDON (METRO), UNITED KINGDOM        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 40,251,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 63,905,000      
Total Costs        
Land 0      
Buildings and Improvements 104,156,000      
Accumulated Depreciation (2,203,000)      
EMEA | LS1 LISBON (METRO), PORTUGAL        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 7,374,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 2,789,000      
Buildings and Improvements 820,000      
Total Costs        
Land 2,789,000      
Buildings and Improvements 8,194,000      
Accumulated Depreciation (193,000)      
EMEA | MA1 MANCHESTER (METRO), UNITED KINGDOM        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 6,453,000      
Total Costs        
Land 0      
Buildings and Improvements 6,453,000      
Accumulated Depreciation (1,765,000)      
EMEA | MA2 MANCHESTER (METRO), UNITED KINGDOM        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 10,439,000      
Total Costs        
Land 0      
Buildings and Improvements 10,439,000      
Accumulated Depreciation (2,586,000)      
EMEA | MA3 MANCHESTER (METRO), UNITED KINGDOM        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 44,931,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 6,813,000      
Total Costs        
Land 0      
Buildings and Improvements 51,744,000      
Accumulated Depreciation (9,862,000)      
EMEA | MA4 MANCHESTER (METRO), UNITED KINGDOM        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 6,697,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 1,957,000      
Total Costs        
Land 0      
Buildings and Improvements 8,654,000      
Accumulated Depreciation (3,245,000)      
EMEA | MD1 MADRID (METRO), SPAIN        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 8,120,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 250,000      
Total Costs        
Land 0      
Buildings and Improvements 8,370,000      
Accumulated Depreciation (165,000)      
EMEA | MD2 MADRID (METRO), SPAIN        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 40,952,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 2,733,000      
Total Costs        
Land 0      
Buildings and Improvements 43,685,000      
Accumulated Depreciation (1,083,000)      
EMEA | ML1 MILAN (METRO), ITALY        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 134,000      
Total Costs        
Land 0      
Buildings and Improvements 134,000      
Accumulated Depreciation (1,000)      
EMEA | ML2 MILAN (METRO), ITALY        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 7,967,000      
Total Costs        
Land 0      
Buildings and Improvements 7,967,000      
Accumulated Depreciation (5,026,000)      
EMEA | ML3 MILAN (METRO), ITALY        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 3,344,000      
Buildings and Improvements 33,566,000      
Total Costs        
Land 3,344,000      
Buildings and Improvements 33,566,000      
Accumulated Depreciation (8,620,000)      
EMEA | ML4 MLAN (METRO), ITALY        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 8,424,000      
Total Costs        
Land 0      
Buildings and Improvements 8,424,000      
Accumulated Depreciation (2,667,000)      
EMEA | MU1 MUNICH (METRO), GERMANY        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 19,124,000      
Total Costs        
Land 0      
Buildings and Improvements 19,124,000      
Accumulated Depreciation (14,244,000)      
EMEA | MU3 MUNICH (METRO), GERMANY        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 2,431,000      
Total Costs        
Land 0      
Buildings and Improvements 2,431,000      
Accumulated Depreciation (1,088,000)      
EMEA | PA1 PARIS (METRO), FRANCE        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 25,484,000      
Total Costs        
Land 0      
Buildings and Improvements 25,484,000      
Accumulated Depreciation (19,996,000)      
EMEA | PA2 & PA3 PARIS (METRO), FRANCE        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 29,615,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 27,071,000      
Buildings and Improvements 292,453,000      
Total Costs        
Land 27,071,000      
Buildings and Improvements 322,068,000      
Accumulated Depreciation (101,473,000)      
EMEA | PA4 PARIS (METRO), FRANCE        
Initial Costs to Company        
Encumbrances 0      
Land 1,701,000      
Buildings and Improvements 9,503,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 239,000      
Buildings and Improvements 228,289,000      
Total Costs        
Land 1,940,000      
Buildings and Improvements 237,792,000      
Accumulated Depreciation (40,718,000)      
EMEA | PA5 PARIS (METRO), FRANCE        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 16,554,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 3,072,000      
Total Costs        
Land 0      
Buildings and Improvements 19,626,000      
Accumulated Depreciation (3,263,000)      
EMEA | PA6 PARIS (METRO), FRANCE        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 66,000,000      
Total Costs        
Land 0      
Buildings and Improvements 66,000,000      
Accumulated Depreciation (13,605,000)      
EMEA | PA7 PARIS (METRO), FRANCE        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 16,137,000      
Total Costs        
Land 0      
Buildings and Improvements 16,137,000      
Accumulated Depreciation (3,976,000)      
EMEA | SA1 SEVILLE (METRO), SPAIN        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 1,594,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 49,000      
Total Costs        
Land 0      
Buildings and Improvements 1,643,000      
Accumulated Depreciation (75,000)      
EMEA | SK1 STOCKHOLM, (METRO), SWEDEN        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 15,495,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 6,758,000      
Total Costs        
Land 0      
Buildings and Improvements 22,253,000      
Accumulated Depreciation (4,131,000)      
EMEA | SK2 STOCKHOLM, (METRO), SWEDEN        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 80,148,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 14,171,000      
Total Costs        
Land 0      
Buildings and Improvements 94,319,000      
Accumulated Depreciation (10,539,000)      
EMEA | SK3 STOCKHOLM, (METRO), SWEDEN        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 15,255,000      
Total Costs        
Land 0      
Buildings and Improvements 15,255,000      
Accumulated Depreciation (2,005,000)      
EMEA | SO1 SOFIA (METRO), BULGARIA        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 5,236,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 2,984,000      
Buildings and Improvements 1,654,000      
Total Costs        
Land 2,984,000      
Buildings and Improvements 6,890,000      
Accumulated Depreciation (860,000)      
EMEA | WA1 WARSAW (METRO), POLAND        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 5,950,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 5,356,000      
Total Costs        
Land 0      
Buildings and Improvements 11,306,000      
Accumulated Depreciation (2,402,000)      
EMEA | WA2 WARSAW (METRO), POLAND        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 4,709,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 3,038,000      
Buildings and Improvements 8,278,000      
Total Costs        
Land 3,038,000      
Buildings and Improvements 12,987,000      
Accumulated Depreciation (1,649,000)      
EMEA | ZH1 ZURICH (METRO), SWITZERLAND        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 4,919,000      
Total Costs        
Land 0      
Buildings and Improvements 4,919,000      
Accumulated Depreciation (4,376,000)      
EMEA | ZH2 ZURICH (METRO), SWITZERLAND        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 5,025,000      
Total Costs        
Land 0      
Buildings and Improvements 5,025,000      
Accumulated Depreciation (3,502,000)      
EMEA | ZH4 ZURICH (METRO), SWITZERLAND        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 11,284,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 29,805,000      
Total Costs        
Land 0      
Buildings and Improvements 41,089,000      
Accumulated Depreciation (21,868,000)      
EMEA | ZH5 ZURICH (METRO), SWITZERLAND        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 7,987,000      
Buildings and Improvements 59,474,000      
Total Costs        
Land 7,987,000      
Buildings and Improvements 59,474,000      
Accumulated Depreciation (15,119,000)      
EMEA | ZW1 ZWOLLE (METRO), THE NETHERLANDS        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 9,453,000      
Total Costs        
Land 0      
Buildings and Improvements 9,453,000      
Accumulated Depreciation (5,416,000)      
EMEA | OTHERS        
Initial Costs to Company        
Encumbrances 0      
Land 3,184,000      
Buildings and Improvements 1,293,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 395,000      
Buildings and Improvements 22,490,000      
Total Costs        
Land 3,579,000      
Buildings and Improvements 23,783,000      
Accumulated Depreciation (914,000)      
Asia-Pacific | HK1 HONG KONG (METRO), CHINA        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 148,027,000      
Total Costs        
Land 0      
Buildings and Improvements 148,027,000      
Accumulated Depreciation (76,233,000)      
Asia-Pacific | HK2 HONG KONG (METRO), CHINA        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 241,480,000      
Total Costs        
Land 0      
Buildings and Improvements 241,480,000      
Accumulated Depreciation (74,971,000)      
Asia-Pacific | HK3 HONG KONG (METRO), CHINA        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 133,673,000      
Total Costs        
Land 0      
Buildings and Improvements 133,673,000      
Accumulated Depreciation (52,731,000)      
Asia-Pacific | HK4 HONG KONG (METRO), CHINA        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 6,913,000      
Total Costs        
Land 0      
Buildings and Improvements 6,913,000      
Accumulated Depreciation (4,882,000)      
Asia-Pacific | HK5 HONG KONG (METRO), CHINA        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 70,002,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 31,781,000      
Total Costs        
Land 0      
Buildings and Improvements 101,783,000      
Accumulated Depreciation (548,000)      
Asia-Pacific | ME1 MELBOURNE (METRO), AUSTRALIA        
Initial Costs to Company        
Encumbrances 0      
Land 15,341,000      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 1,269,000      
Buildings and Improvements 73,238,000      
Total Costs        
Land 16,610,000      
Buildings and Improvements 73,238,000      
Accumulated Depreciation (10,711,000)      
Asia-Pacific | OS1 OSAKA (METRO), JAPAN        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 14,876,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 53,015,000      
Total Costs        
Land 0      
Buildings and Improvements 67,891,000      
Accumulated Depreciation (12,946,000)      
Asia-Pacific | SG1 SINGAPORE (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 178,617,000      
Total Costs        
Land 0      
Buildings and Improvements 178,617,000      
Accumulated Depreciation (116,756,000)      
Asia-Pacific | SG2 SINGAPORE (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 322,842,000      
Total Costs        
Land 0      
Buildings and Improvements 322,842,000      
Accumulated Depreciation (135,587,000)      
Asia-Pacific | SG3 SINGAPORE (METRO)        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 34,844,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 110,842,000      
Total Costs        
Land 0      
Buildings and Improvements 145,686,000      
Accumulated Depreciation (20,324,000)      
Asia-Pacific | SH2 SHANGHAI (METRO), CHINA        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 3,921,000      
Total Costs        
Land 0      
Buildings and Improvements 3,921,000      
Accumulated Depreciation (1,369,000)      
Asia-Pacific | SH3 SHANGHAI (METRO), CHINA        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 7,066,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 9,650,000      
Total Costs        
Land 0      
Buildings and Improvements 16,716,000      
Accumulated Depreciation (4,595,000)      
Asia-Pacific | SH4 SHANGHAI (METRO), CHINA        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 1,707,000      
Total Costs        
Land 0      
Buildings and Improvements 1,707,000      
Accumulated Depreciation (1,875,000)      
Asia-Pacific | SH5 SHANGHAI (METRO), CHINA        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 11,284,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 21,513,000      
Total Costs        
Land 0      
Buildings and Improvements 32,797,000      
Accumulated Depreciation (8,463,000)      
Asia-Pacific | SH6 SHANGHAI (METRO), CHINA        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 16,545,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 1,893,000      
Total Costs        
Land 0      
Buildings and Improvements 18,438,000      
Accumulated Depreciation 0      
Asia-Pacific | SY1 SYDNEY (METRO), AUSTRALIA        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 26,684,000      
Total Costs        
Land 0      
Buildings and Improvements 26,684,000      
Accumulated Depreciation (14,867,000)      
Asia-Pacific | SY2 SYDNEY (METRO), AUSTRALIA        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 3,080,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 35,042,000      
Total Costs        
Land 0      
Buildings and Improvements 38,122,000      
Accumulated Depreciation (21,647,000)      
Asia-Pacific | SY3 SYDNEY (METRO), AUSTRALIA        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 8,712,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 148,640,000      
Total Costs        
Land 0      
Buildings and Improvements 157,352,000      
Accumulated Depreciation (56,626,000)      
Asia-Pacific | SY4 SYDNEY (METRO), AUSTRALIA        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 145,683,000      
Total Costs        
Land 0      
Buildings and Improvements 145,683,000      
Accumulated Depreciation (9,490,000)      
Asia-Pacific | TY1 TOKYO (METRO), JAPAN        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 19,426,000      
Total Costs        
Land 0      
Buildings and Improvements 19,426,000      
Accumulated Depreciation (10,395,000)      
Asia-Pacific | TY2 TOKYO (METRO), JAPAN        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 85,617,000      
Total Costs        
Land 0      
Buildings and Improvements 85,617,000      
Accumulated Depreciation (60,135,000)      
Asia-Pacific | TY3 TOKYO (METRO), JAPAN        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 73,526,000      
Total Costs        
Land 0      
Buildings and Improvements 73,526,000      
Accumulated Depreciation (29,924,000)      
Asia-Pacific | TY4 TOKYO (METRO), JAPAN        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 53,000,000      
Total Costs        
Land 0      
Buildings and Improvements 53,000,000      
Accumulated Depreciation (15,975,000)      
Asia-Pacific | TY5 TOKYO (METRO), JAPAN        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 102,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 52,606,000      
Total Costs        
Land 0      
Buildings and Improvements 52,708,000      
Accumulated Depreciation (5,060,000)      
Asia-Pacific | TY6 TOKYO (METRO), JAPAN        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 37,941,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 11,646,000      
Total Costs        
Land 0      
Buildings and Improvements 49,587,000      
Accumulated Depreciation (12,113,000)      
Asia-Pacific | TY7 TOKYO (METRO), JAPAN        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 13,175,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 4,669,000      
Total Costs        
Land 0      
Buildings and Improvements 17,844,000      
Accumulated Depreciation (5,597,000)      
Asia-Pacific | TY8 TOKYO (METRO), JAPAN        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 53,848,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 5,505,000      
Total Costs        
Land 0      
Buildings and Improvements 59,353,000      
Accumulated Depreciation (10,006,000)      
Asia-Pacific | TY9 TOKYO (METRO), JAPAN        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 106,710,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 6,877,000      
Total Costs        
Land 0      
Buildings and Improvements 113,587,000      
Accumulated Depreciation (24,123,000)      
Asia-Pacific | TY10 TOKYO (METRO), JAPAN        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 69,881,000      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 11,665,000      
Total Costs        
Land 0      
Buildings and Improvements 81,546,000      
Accumulated Depreciation (10,751,000)      
Asia-Pacific | OTHERS        
Initial Costs to Company        
Encumbrances 0      
Land 0      
Buildings and Improvements 0      
Costs Capitalized Subsequent to Acquisition or Lease        
Land 0      
Buildings and Improvements 32,794,000      
Total Costs        
Land 0      
Buildings and Improvements 32,794,000      
Accumulated Depreciation $ (15,986,000)