XML 45 R34.htm IDEA: XBRL DOCUMENT v3.5.0.2
Environmental Matters (Details)
$ in Millions
9 Months Ended
Sep. 30, 2016
USD ($)
MW
Dec. 31, 2015
USD ($)
Air Quality [Abstract]    
Percentage of coal fired generating fleet currently being scrubbed for SO2 (in hundredths) 100.00%  
Percentage of coal fired generating fleet currently controlled for NOx (in hundredths) 90.00%  
Coal Ash Waste Disposal, Ash Ponds and Water [Abstract]    
Asset Retirement Obligation $ 25.0  
Estimated spend for ash pond dam reinforcement and other operational changes $ 12.0  
Climate Changes [Abstract]    
Vectren's share of Indiana's CO2 emissions in 2013 (as a percent) 6.00%  
Percent reduction of Vectren's CO2 emissions since 2005 31.00%  
Long term contract for purchase of electric power generated by wind energy (in megawatts) | MW 80  
Percentage of total electricity obtained by the supplier to meet the energy needs of its retail customers provided by clean energy sources (in hundredths) 4.00%  
Vectren's emission rate (as measured in lbs CO2/MWh) prior to installation of new technology 1,967  
Vectren's emission rate (as measured in lbs CO2/MWh) after installation of new technology 1,922  
Percentage reduction of lbs CO2/MWh since 2005 3.00%  
Manufactured Gas Plants    
Environmental Remediation Expense $ 43.4  
Accrual for Environmental Loss Contingencies Included In Other Liabilities $ 2.5 $ 3.3
Indiana Gas [Member]    
Manufactured Gas Plants    
Number of sites identified with potential remedial responsibility for entity (in number of sites) 26  
Environmental Remediation Expense $ 23.2  
Insurance Recoveries $ 20.8  
SIGECO [Member]    
Manufactured Gas Plants    
Number of sites identified with potential remedial responsibility for entity (in number of sites) 5  
Environmental Remediation Expense $ 20.2  
Insurance Recoveries 14.8  
Total estimated insurance recoveries 15.8  
Minimum [Member]    
Coal Ash Waste Disposal, Ash Ponds and Water [Abstract]    
Ash Pond and Coal Ash Retirement, Anticipated Cost 35.0  
Estimated capital expenditures to comply with Clean Water Act 4.0  
Maximum [Member]    
Coal Ash Waste Disposal, Ash Ponds and Water [Abstract]    
Ash Pond and Coal Ash Retirement, Anticipated Cost 80.0  
Estimated capital expenditures to comply with Clean Water Act $ 8.0