0001062993-16-008388.txt : 20160317 0001062993-16-008388.hdr.sgml : 20160317 20160317142213 ACCESSION NUMBER: 0001062993-16-008388 CONFORMED SUBMISSION TYPE: 6-K PUBLIC DOCUMENT COUNT: 4 CONFORMED PERIOD OF REPORT: 20160317 FILED AS OF DATE: 20160317 DATE AS OF CHANGE: 20160317 FILER: COMPANY DATA: COMPANY CONFORMED NAME: PLATINUM GROUP METALS LTD CENTRAL INDEX KEY: 0001095052 STANDARD INDUSTRIAL CLASSIFICATION: GOLD & SILVER ORES [1040] IRS NUMBER: 000000000 STATE OF INCORPORATION: A1 FISCAL YEAR END: 0831 FILING VALUES: FORM TYPE: 6-K SEC ACT: 1934 Act SEC FILE NUMBER: 001-33562 FILM NUMBER: 161512230 BUSINESS ADDRESS: STREET 1: 788 - 550 BURRARD STREET CITY: VANCOUVER STATE: A1 ZIP: V6C 2B5 BUSINESS PHONE: 6048995450 MAIL ADDRESS: STREET 1: 788 - 550 BURRARD STREET CITY: VANCOUVER STATE: A1 ZIP: V6C 2B5 FORMER COMPANY: FORMER CONFORMED NAME: NEW MILLENNIUM METALS CORP DATE OF NAME CHANGE: 19990915 6-K 1 form6k.htm FORM 6-K Platinum Group Metals Ltd. - Form 6-K - Filed by newsfilecorp.com

UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549

FORM 6-K

Report of Foreign Private Issuer
Pursuant to Rule 13a-16 or 15d-16
of the Securities Exchange Act of 1934

For the period of: March 17, 2016

PLATINUM GROUP METALS LTD.
(SEC File No. 001-33562)

Suite 788 – 550 Burrard Street, Vancouver BC, V6C 2B5, CANADA
Address of Principal Executive Office

Indicate by check mark whether the registrant files or will file annual reports under cover:

Form 20-F [   ]        Form 40-F [X]

Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(1): [   ]

Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(7): [   ]

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

Date: March 17, 2016 “R. Michael Jones”
  R. MICHAEL JONES
  DIRECTOR & CEO

 


EXHIBIT INDEX

Exhibit Description
99.1 News Release dated March 17, 2016
99.2 Material Change Report dated March 17, 2016


EX-99.1 2 exhibit99-1.htm EXHIBIT 99.1 Platinum Group Metals Ltd. - Exhibit 99.1 - Filed by newsfilecorp.com
 
788 – 550 Burrard Street
Vancouver, BC V6C 2B5
P: 604-899-5450
F: 604-484-4710

News Release No. 16-318
March 17, 2016

Platinum Group Metals Ltd. Advances Resource Drilling at Waterberg; Multiple
Thick, High Grade Mining Areas Targeted in Upcoming Pre-Feasibility Study

(Vancouver/Johannesburg) Platinum Group Metals Ltd. (PTM-TSX; PLG-NYSE MKT) (“Platinum Group” or the “Company”) is pleased to announce that over 90% of recent infill drilling on the Waterberg deposit has successfully intersected the “T” and “F” targeted layers. The deposit has been extended both up-dip and at depth.

New features from recent drilling include:

  • Multiple High Grade “Super T zone” intercepts including 13.91 g/t platinum, palladium and gold (“3E”) over 11.87 meters; and
  • Multiple “Super F zone” intercepts creating targets for shallow resources at less than 300 meters vertical from surface.

Confirmation drilling has delineated large scale F zone blocks at grades higher than the deposit average which can be separately modelled and prioritized for mining in an ongoing Pre-Feasibility Study. New high grade T zone blocks are also emerging at depth. Additional drilling to offset these new high grade T zone intercepts has been approved by the Waterberg Joint Venture and is now underway. The Japan Oil, Gas and Metals National Corporation (“JOGMEC”) is funding the current drilling and Pre-Feasibility engineering work.

R. Michael Jones, President, CEO and co-founder of Platinum Group Metals said “Definition drilling is allowing us to model Waterberg as a series of potential mining areas rather than as one 13 kilometer deposit. Given the scale of known resources, and being only 140 meters from surface, Waterberg is certainly big and shallow. The definition drilling results allow us to target the best grade in five large potential mining blocks, each at a scale typical of a stand-alone South African platinum mine shaft or decline complex. The new emerging high grade T zone adds a completely new dimension. Waterberg will now be considered a mining district to be prioritized rather than as a single deposit in the ongoing Pre-Feasibility Study.”

The 27 new drill holes (15,500 meters of core) reported herein, plus results from 265 earlier holes (249,000 meters of core) completed for the previous July 2015 resource estimate, outline five potential mining areas: T zone, Super T, Central Super F, Boundary Super F and Northern Super F. A total of 7 holes and 6,000 assays are still pending at this time from the ongoing drill program.

Higher grade intercepts reported herein, combined with earlier higher grade cuts, create specific blocks to be considered in pre-feasibility mine planning and engineering work. An updated resource calculation is in progress, modelled on 2.5 g/t, 3.5 g/t and 4.0 g/t platinum, palladium, rhodium and gold (“4E”) lower cut-off grades for the identified blocks.



PLATINUM GROUP METALS LTD. …2

New Highlight Drill Results

Super T borehole details are listed below. The term “Super” designates an intercept thickness of greater than 6 meters at over 5 g/t. In the F Zone “Super is used for an intercept of more than 10 meters. True thickness is approximately 79% of the reported intercept width. It is logical to consider intercepts at up to 6 meters vertical thickness for standard mechanized mining methods. At 6 to 10 meters thick other methods for mechanized extraction can be considered. Beyond 10 meters thick bulk underground mining methods may be considered.

To put the Super T and Super F intercepts into perspective, a common measure for mine planning comparison in layered deposits is thickness multiplied by grade measured in centimeter grams per tonne (“cmg/t”). An intercept of 10 meters of 3 grams per tonne or an intercept of 6 meters of 5 grams per tonne both have 3,000 cmg/t. By comparison a typical Merensky reef platinum mine would have 1 meter of 6 grams per tonne or 600 cmg/t.

New “Super” T – The following holes define an emerging Super T zone:

Hole WB195 - 13.91g/t 3E over 11.87 meters (or 15.03 g/t 3E over 8.68 meters, from 898.32 meters to 907.0 meters);

Hole WB186 - 5.84 g/t 3E over 19.00 meters from 812.00 meters to 831.00 meters (this hole announced December 4, 2015); and

Hole WB200 - 5.92 g/t 3E over 7.56 meters from 938.44 meters to 946 meters.

Earlier T zone drilling in this area up-dip from the Super T zone includes:

Hole WB032 – 5.04 g/t 3E over 4.25 meters from 799.67 meters to 803.92 meters (this hole drilled November, 2011);

Hole WB187 – 9.97 g/t 3E over 3.41 meters from 681.59 meters to 685.00 meters (this hole announced December 4, 2015); and

Hole WB188 – 10.28 g/t 3E over 4.50 meters from 633.50 meters to 638.00 meters (this hole announced December 4, 2015).

Central Super F

3 Shallow holes awaiting assays

Boundary Super F

WE080 4.15g/t 3E over 21.50 meters from 297.00 meters to 318.50 meters.

Northern Super F

WE078D2 5.13 g/t 3E over 17.25 meters from 283.75 to 301 meters.




PLATINUM GROUP METALS LTD. …3

Drill Result Details


BHID

ZONE

FROM

TO
Length 3E Pt Pd Au
meters g/t g/t g/t g/t
WE077D0 NSF 455.53 459.88 4.35 1.67 0.50 1.08 0.09
WE077D1 NSF 461.00 465.39 4.39 3.27 0.89 2.20 0.18
WE078D1 NSF 283.39 300.97 17.58 4.95 1.38 3.33 0.24
WE078D2 NSF 283.75 301.00 17.25 5.13 1.61 3.24 0.28
WE079D1 NSF 337.00 353.93 16.93 2.93 0.80 1.97 0.16
WE079D2 NSF 333.27 352.00 18.73 2.56 0.70 1.71 0.14
 
WE080D0 BSF 297.00 318.50 21.50 4.15 1.18 2.75 0.23
WE081D0 BSF Beyond sub crop        
WE082D0 BSF 342.00 353.06 11.06 5.72 1.77 3.72 0.24
WE082D1 BSF 342.00 352.89 10.89 5.33 1.56 3.55 0.22
WE082D2 BSF 342.00 352.91 10.91 5.57 1.62 3.76 0.20
WE083D0 BSF 248.50 258.00 9.50 2.96 0.92 1.89 0.16
WE083D1 BSF 247.00 256.50 9.50 3.10 0.84 2.13 0.13
WE084D0 BSF 216.50 225.50 9.00 3.75 1.08 2.43 0.25
WE085D0 BSF 292.00 299.65 7.65 2.64 0.87 1.53 0.24
WE086D0 BSF Low grade        
WE087D0 BSF Beyond sub crop        
WE088D0 BSF Beyond sub crop        
WE089D0 BSF 398.00     Awaiting assays
WE090D0 BSF Beyond sub crop        
WB202D0 BSF 250.00     Awaiting assays
WB203D0 BSF Beyond sub crop        
WB204D0 BSF 270.00     Awaiting assays
                 
WB195D0 T-Zone 895.63 907.50 11.87 13.91 4.46 7.32 2.13
WB196D0 T-Zone Replaced by dyke        
WB197D0 T-Zone 937.91 944.00 6.09 2.17 0.80 1.13 0.24
WB198D0 T-Zone 635.00 641.85 6.85 2.76 1.25 1.35 0.15
WB199D0 T-Zone 572.50 580.40 7.90 1.32 0.54 0.69 0.09
WB200D0 T-Zone 938.44 946.00 7.56 5.92 1.67 3.46 0.79
WB201D0 T-Zone 770.00     Awaiting assays
 
WB205D0 CSF 415.00     Awaiting assays
WB206D0 CSF 388.00     Awaiting assays
WB207D0 CSF 310.00     Awaiting assays

MILESTONES

  • End of March 2016 - Resource update


PLATINUM GROUP METALS LTD. …4
  • April 1, 2016 - Commencement of new JOGMEC budget year for funding for US$ 5.5 million, 100% of project costs (part of a US$ 20 million commitment to 2018)
  • July 2016 - Pre-Feasibility Study completed
  • End 2016 - Application submission for a Mining Right
  • 2017 - Definitive Feasibility Study

For more information on these matters, please refer to Platinum Group’s information circular, available on SEDAR (www.sedar.com) or visit our website at www.platinumgroupmetals.net.

Qualified Person and Quality Assurance and Control

R. Michael Jones, P.Eng., the Company's President, Chief Executive Officer and a significant shareholder of the Company, is a non-independent qualified person as defined in National Instrument 43-101 Standards of Disclosure for Mineral Projects and is responsible for preparing the technical information contained in this news release. He has verified the data by ensuring experienced qualified personnel are working with the core and data, reviewing selected core, core logs and assay data, visiting the site and drill rigs and ensuring that the Independent Qualified Person is updated in the project progress and plans. Assay results are part of an extensive quality control program including chain of custody, insertion of blanks and standards, carefully reviewing data on company standards and checking accuracy with independent lab checks. The assays have been completed at Bureau Veritas Inspectorate and Set Point accredited laboratories by standard fire assay and ICP finish methods.

About Waterberg

Waterberg was newly discovered by the Company and its joint venture partners including JOGMEC the Japanese State Company in late 2011. Waterberg was hidden from previous exploration by 140 meters of sedimentary cover which is the reason it was not previously found. Waterberg has been studied since its discovery in co-operation with Witwatersrand University and its mineralogy and age date have suggested it is a Bushveld Complex deposit but in a new set of layers and geological domain. Waterberg is not aligned with the classic South African platinum reefs of the Merensky, UG-2 or the Platreef. The Waterberg has been metallurgical tested and found to produce a desirable concentrate with similar characteristics to the preferred Merensky Reef.

Resources at Waterberg total:

25.64 million 3E ounces Inferred plus 12.61 million 3E ounces Indicated
Inferred - 246 million tonnes grading 3.25 g/t 3E (0.98 g/t Pt, 2.11 g/t, Pd, 0.16 g/t Au, 2.50 g/t cut-off)
Indicated - 121 million tonnes grading 3.24 g/t 3E (0.97g/t Pt, 2.11 g/t, Pd, 0.16g/t Au, 2.50 g/t cut-off)

(See Independent Technical Report by C. Muller of CJM Consulting South Africa (Pty) Ltd. dated Sept 4, 2015 at www.sedar.com for details)

These resources will be updated with the results of the drilling announced today and other drilling completed before the end of March 2016.



PLATINUM GROUP METALS LTD. …5

About Platinum Group Metals Ltd.

Platinum Group Metals Ltd., based in Johannesburg, South Africa and Vancouver, Canada, has a successful track record with more than 20 years of experience in exploration, mine discovery, mine construction and mine operations.

Formed in 2002, Platinum Group holds significant mineral rights in the Bushveld Igneous Complex of South Africa, which is host to over 70% of the world's primary platinum production. The Company recently commissioned and began concentrate sales at the Maseve Platinum mine, a shallow, high-grade operation. Maseve is currently in ramp-up phase and is expected to produce 250,000 ounces (4E) per year on a steady state basis.

Platinum Group has expanded its exploration and development efforts on the North Limb of the Bushveld Complex at the Waterberg Project. Waterberg represents a new bulk type of platinum, palladium and gold deposit that is being studied for potential mechanized mining in partnership with Japanese state Company JOGMEC.

On behalf of the Board of
Platinum Group Metals Ltd.

R. Michael Jones
CEO and Co-Founder

For further information contact:
               R. Michael Jones, President 
               or Kris Begic, VP, Corporate Development 
               Platinum Group Metals Ltd., Vancouver 
               Tel: (604) 899-5450 / Toll Free: (866) 899-5450 
               www.platinumgroupmetals.net

Disclosure

The Toronto Stock Exchange and the NYSE MKT LLC have not reviewed and do not accept responsibility for the accuracy or adequacy of this news release, which has been prepared by management. This press release may contain forward-looking information within the meaning of Canadian securities laws and forward-looking statements within the meaning of U.S. securities laws (collectively “forward-looking statements”). Forward-looking statements are typically identified by words such as: believe, expect, anticipate, intend, estimate, plans, postulate and similar expressions, or are those, which, by their nature, refer to future events. All statements that are not statements of historical fact are forward-looking statements. Although the Company believes any forward-looking statements in this press release are reasonable, it can give no assurance that the expectations and assumptions in such statements will prove to be correct. The Company cautions investors that any forward-looking statements by the Company are not guarantees of future results or performance, and that actual results may differ materially from those in forward-looking statements as a result of various factors. The Company directs readers to the risk factors described in the Company’s Form 40-F annual report, annual information form and other filings with the Securities and Exchange Commission and Canadian securities regulators, which may be viewed at www.sec.gov and www.sedar.com, respectively.


EX-99.2 3 exhibit99-2.htm EXHIBIT 99.2 Platinum Group Metals Ltd. - Exhibit 99.2 - Filed by newsfilecorp.com

FORM 51-102F3
MATERIAL CHANGE REPORT

ITEM 1.

NAME AND ADDRESS OF COMPANY

 

 

 

PLATINUM GROUP METALS LTD. (the “Company” or “Platinum Group”)

 

788 – 550 Burrard Street Vancouver BC, V6C 2B5

 

Telephone: (604) 899-5450 Facsimile: (604) 484-4710

 

 

ITEM 2.

DATE OF MATERIAL CHANGE

 

 

 

March 17, 2016

 

 

ITEM 3.

NEWS RELEASE

 

 

A news release was disseminated on March 17, 2016 to the TSX as well as through various other approved public media and was SEDAR filed with the British Columbia, Alberta, Saskatchewan, Manitoba, Ontario, Quebec, New Brunswick, Nova Scotia, Prince Edward Island and Newfoundland Securities Commissions.

 

 

ITEM 4.

SUMMARY OF MATERIAL CHANGE

 

 

(Vancouver, British Columbia) Platinum Group Metals Ltd. (PTM-TSX; PLG- NYSE MKT) (“Platinum Group” or the “Company”) is pleased to announce that over 90% of recent infill drilling on the Waterberg deposit has successfully intersected the “T” and “F” targeted layers. The deposit has been extended both up-dip and at depth.

 

 

ITEM 5.

FULL DESCRIPTION OF MATERIAL CHANGE

 

 

(Vancouver, British Columbia) Platinum Group Metals Ltd. (PTM-TSX; PLG- NYSE MKT) (“Platinum Group” or the “Company”) is pleased to announce that over 90% of recent infill drilling on the Waterberg deposit has successfully intersected the “T” and “F” targeted layers. The deposit has been extended both up-dip and at depth.

 

 

 

New features from recent drilling include:


  Multiple High Grade “Super T zone” intercepts including 13.91 g/t platinum, palladium and gold (“3E”) over 11.87 meters; and
  Multiple “Super F zone” intercepts creating targets for shallow resources at less than 300 meters vertical from surface.

Confirmation drilling has delineated large scale F zone blocks at grades higher than the deposit average which can be separately modelled and prioritized for mining in an ongoing Pre-Feasibility Study. New high grade T zone blocks are also emerging at depth. Additional drilling to offset these new high grade T zone intercepts has been approved by the Waterberg Joint Venture and is now underway. The Japan Oil, Gas and Metals National Corporation (“JOGMEC”) is funding the current drilling and Pre-Feasibility engineering work.


R. Michael Jones, President, CEO and co-founder of Platinum Group Metals said “Definition drilling is allowing us to model Waterberg as a series of potential mining areas rather than as one 13 kilometer deposit. Given the scale of known resources, and being only 140 meters from surface, Waterberg is certainly big and shallow. The definition drilling results allow us to target the best grade in five large potential mining blocks, each at a scale typical of a stand-alone South African platinum mine shaft or decline complex. The new emerging high grade T zone adds a completely new dimension. Waterberg will now be considered a mining district to be prioritized rather than as a single deposit in the ongoing Pre-Feasibility Study.”

The 27 new drill holes (15,500 meters of core) reported herein, plus results from 265 earlier holes (249,000 meters of core) completed for the previous July 2015 resource estimate, outline five potential mining areas: T zone, Super T, Central Super F, Boundary Super F and Northern Super F. A total of 7 holes and 6,000 assays are still pending at this time from the ongoing drill program.

Higher grade intercepts reported herein, combined with earlier higher grade cuts, create specific blocks to be considered in pre-feasibility mine planning and engineering work. An updated resource calculation is in progress, modelled on 2.5 g/t, 3.5 g/t and 4.0 g/t platinum, palladium, rhodium and gold (“4E”) lower cut-off grades for the identified blocks.

New Highlight Drill Results

Super T borehole details are listed below. The term “Super” designates an intercept thickness of greater than 6 meters at over 5 g/t. In the F Zone “Super is used for an intercept of more than 10 meters. True thickness is approximately 79% of the reported intercept width. It is logical to consider intercepts at up to 6 meters vertical thickness for standard mechanized mining methods. At 6 to 10 meters thick other methods for mechanized extraction can be considered. Beyond 10 meters thick bulk underground mining methods may be considered.

To put the Super T and Super F intercepts into perspective, a common measure for mine planning comparison in layered deposits is thickness multiplied by grade measured in centimeter grams per tonne (“cmg/t”). An intercept of 10 meters of 3 grams per tonne or an intercept of 6 meters of 5 grams per tonne both have 3,000 cmg/t. By comparison a typical Merensky reef platinum mine would have 1 meter of 6 grams per tonne or 600 cmg/t.

New “Super” T – The following holes define an emerging Super T zone:

Hole WB195 - 13.91g/t 3E over 11.87 meters (or 15.03 g/t 3E over 8.68 meters, from 898.32 meters to 907.0 meters);

Hole WB186 - 5.84 g/t 3E over 19.00 meters from 812.00 meters to 831.00 meters (this hole announced December 4, 2015); and

Hole WB200 - 5.92 g/t 3E over 7.56 meters from 938.44 meters to 946 meters.

Earlier T zone drilling in this area up-dip from the Super T zone includes:


Hole WB032 – 5.04 g/t 3E over 4.25 meters from 799.67 meters to 803.92 meters (this hole drilled November, 2011);

Hole WB187 – 9.97 g/t 3E over 3.41 meters from 681.59 meters to 685.00 meters (this hole announced December 4, 2015); and

Hole WB188 – 10.28 g/t 3E over 4.50 meters from 633.50 meters to 638.00 meters (this hole announced December 4, 2015).

Central Super F

3 Shallow holes awaiting assays

Boundary Super F

WE080 4.15g/t 3E over 21.50 meters from 297.00 meters to 318.50 meters.

Northern Super F

WE078D2 5.13 g/t 3E over 17.25 meters from 283.75 to 301 meters.

Drill Result Details


BHID

ZONE

FROM

TO
Length 3E Pt Pd Au
meters g/t g/t g/t g/t
WE077D0 NSF 455.53 459.88 4.35 1.67 0.50 1.08 0.09
WE077D1 NSF 461.00 465.39 4.39 3.27 0.89 2.20 0.18
WE078D1 NSF 283.39 300.97 17.58 4.95 1.38 3.33 0.24
WE078D2 NSF 283.75 301.00 17.25 5.13 1.61 3.24 0.28
WE079D1 NSF 337.00 353.93 16.93 2.93 0.80 1.97 0.16
WE079D2 NSF 333.27 352.00 18.73 2.56 0.70 1.71 0.14
 
WE080D0 BSF 297.00 318.50 21.50 4.15 1.18 2.75 0.23
WE081D0 BSF Beyond sub crop        
WE082D0 BSF 342.00 353.06 11.06 5.72 1.77 3.72 0.24
WE082D1 BSF 342.00 352.89 10.89 5.33 1.56 3.55 0.22
WE082D2 BSF 342.00 352.91 10.91 5.57 1.62 3.76 0.20
WE083D0 BSF 248.50 258.00 9.50 2.96 0.92 1.89 0.16
WE083D1 BSF 247.00 256.50 9.50 3.10 0.84 2.13 0.13
WE084D0 BSF 216.50 225.50 9.00 3.75 1.08 2.43 0.25
WE085D0 BSF 292.00 299.65 7.65 2.64 0.87 1.53 0.24
WE086D0 BSF Low grade        
WE087D0 BSF Beyond sub crop        
WE088D0 BSF Beyond sub crop        
WE089D0 BSF 398.00     Awaiting assays
WE090D0 BSF Beyond sub crop        
WB202D0 BSF 250.00     Awaiting assays
WB203D0 BSF Beyond sub crop        
WB204D0 BSF 270.00     Awaiting assays



                 
WB195D0 T-Zone 895.63 907.50 11.87 13.91 4.46 7.32 2.13
WB196D0 T-Zone Replaced by dyke        
WB197D0 T-Zone 937.91 944.00 6.09 2.17 0.80 1.13 0.24
WB198D0 T-Zone 635.00 641.85 6.85 2.76 1.25 1.35 0.15
WB199D0 T-Zone 572.50 580.40 7.90 1.32 0.54 0.69 0.09
WB200D0 T-Zone 938.44 946.00 7.56 5.92 1.67 3.46 0.79
WB201D0 T-Zone 770.00     Awaiting assays
 
WB205D0 CSF 415.00     Awaiting assays
WB206D0 CSF 388.00     Awaiting assays
WB207D0 CSF 310.00     Awaiting assays

MILESTONES

 

End of March 2016 - Resource update

 

April 1, 2016 - Commencement of new JOGMEC budget year for funding for US$ 5.5 million, 100% of project costs (part of a US$ 20 million commitment to 2018)

 

July 2016 - Pre-Feasibility Study completed

 

End 2016 - Application submission for a Mining Right

 

2017 - Definitive Feasibility Study

For more information on these matters, please refer to Platinum Group’s information circular, available on SEDAR (www.sedar.com) or visit our website at www.platinumgroupmetals.net.

Qualified Person and Quality Assurance and Control

R. Michael Jones, P.Eng., the Company's President, Chief Executive Officer and a significant shareholder of the Company, is a non-independent qualified person as defined in National Instrument 43-101 Standards of Disclosure for Mineral Projects and is responsible for preparing the technical information contained in this news release. He has verified the data by ensuring experienced qualified personnel are working with the core and data, reviewing selected core, core logs and assay data, visiting the site and drill rigs and ensuring that the Independent Qualified Person is updated in the project progress and plans. Assay results are part of an extensive quality control program including chain of custody, insertion of blanks and standards, carefully reviewing data on company standards and checking accuracy with independent lab checks. The assays have been completed at Bureau Veritas Inspectorate and Set Point accredited laboratories by standard fire assay and ICP finish methods.

About Waterberg

Waterberg was newly discovered by the Company and its joint venture partners including JOGMEC the Japanese State Company in late 2011. Waterberg was hidden from previous exploration by 140 meters of sedimentary cover which is the reason it was not previously found. Waterberg has been studied since its discovery in co-operation with Witwatersrand University and its mineralogy and age date have suggested it is a Bushveld Complex deposit but in a new set of layers and geological domain. Waterberg is not aligned with the classic South African platinum reefs of the Merensky, UG-2 or the Platreef. The Waterberg has been metallurgical tested and found to produce a desirable concentrate with similar characteristics to the preferred Merensky Reef.


Resources at Waterberg total:

25.64 million 3E ounces Inferred plus 12.61 million 3E ounces Indicated
Inferred - 246 million tonnes grading 3.25 g/t 3E (0.98 g/t Pt, 2.11 g/t, Pd, 0.16 g/t Au, 2.50 g/t cut-off)
Indicated - 121 million tonnes grading 3.24 g/t 3E (0.97g/t Pt, 2.11 g/t, Pd, 0.16g/t Au, 2.50 g/t cut-off)

(See Independent Technical Report by C. Muller of CJM Consulting South Africa (Pty) Ltd. dated Sept 4, 2015 at www.sedar.com for details)

These resources will be updated with the results of the drilling announced today and other drilling completed before the end of March 2016.

About Platinum Group Metals Ltd.

Platinum Group Metals Ltd., based in Johannesburg, South Africa and Vancouver, Canada, has a successful track record with more than 20 years of experience in exploration, mine discovery, mine construction and mine operations.

Formed in 2002, Platinum Group holds significant mineral rights in the Bushveld Igneous Complex of South Africa, which is host to over 70% of the world's primary platinum production. The Company recently commissioned and began concentrate sales at the Maseve Platinum mine, a shallow, high-grade operation. Maseve is currently in ramp-up phase and is expected to produce 250,000 ounces (4E) per year on a steady state basis.

Platinum Group has expanded its exploration and development efforts on the North Limb of the Bushveld Complex at the Waterberg Project. Waterberg represents a new bulk type of platinum, palladium and gold deposit that is being studied for potential mechanized mining in partnership with Japanese state Company JOGMEC.

On behalf of the Board of
Platinum Group Metals Ltd.

R. Michael Jones
CEO and Co-Founder
For further information contact:

R. Michael Jones, President
or Kris Begic, VP, Corporate Development
Platinum Group Metals Ltd., Vancouver
Tel: (604) 899-5450 / Toll Free: (866) 899-5450
www.platinumgroupmetals.net



  Disclosure
   

The Toronto Stock Exchange and the NYSE MKT LLC have not reviewed and do not accept responsibility for the accuracy or adequacy of this news release, which has been prepared by management. This press release may contain forward- looking information within the meaning of Canadian securities laws and forward- looking statements within the meaning of U.S. securities laws (collectively “forward-looking statements”). Forward-looking statements are typically identified by words such as: believe, expect, anticipate, intend, estimate, plans, postulate and similar expressions, or are those, which, by their nature, refer to future events. All statements that are not statements of historical fact are forward- looking statements. Although the Company believes any forward-looking statements in this press release are reasonable, it can give no assurance that the expectations and assumptions in such statements will prove to be correct. The Company cautions investors that any forward-looking statements by the Company are not guarantees of future results or performance, and that actual results may differ materially from those in forward-looking statements as a result of various factors. The Company directs readers to the risk factors described in the Company’s Form 40-F annual report, annual information form and other filings with the Securities and Exchange Commission and Canadian securities regulators, which may be viewed at www.sec.gov and www.sedar.com, respectively

   
ITEM 6.

RELIANCE ON SUBSECTION 7.1 OF NATIONAL INSTRUMENT 51-102

   
 

N/A

   
ITEM 7.

OMITTED INFORMATION

   
 

N/A

   
ITEM 8.

EXECUTIVE OFFICER

   

The following senior officer of the Issuer is knowledgeable about the material change and may be contacted by the Commission at the following telephone number:

   
 

R. Michael Jones, President & CEO Phone: (604) 899-5450

   
ITEM 9.

DATE OF REPORT

   
 

March 17, 2016



GRAPHIC 4 exhibit99-1x1x1.jpg GRAPHIC begin 644 exhibit99-1x1x1.jpg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