Regulatory Assets and Liabilities
Regulatory accounting allows PSE to defer certain costs that would otherwise be charged to expense, if it is probable that future rates will permit recovery of such costs.  It similarly requires deferral of revenues or gains that are expected to be returned to customers in the future.
The net regulatory assets and liabilities at December 31, 2021, and 2020, are included the following tables:
Puget Sound EnergyRemaining Amortization PeriodDecember 31,
(Dollars in Thousands)20212020
Environmental remediation(a)$127,977 $102,647 
Storm damage costs electric4 years127,789 108,491 
PCA mechanismN/A79,546 82,801 
Decoupling deferrals and interest (b)
Less than 2 years
79,125 88,504 
Chelan PUD contract initiation9.8 years69,699 76,787 
Deferred Washington Commission AFUDC30 years62,244 59,763 
PGA receivable2 years57,935 87,655 
Baker Dam licensing operating and maintenance costs(c)54,525 54,354 
Lower Snake River15.4 years53,757 58,442 
Get to zero depreciation expense deferralN/A50,220 53,236 
Unamortized loss on reacquired debt
1 to 46 years
35,805 37,991 
Property tax tracker
Less than 2 years
25,896 24,860 
Advanced metering infrastructure(a) 23,037 22,652 
Low Income Program CostsN/A21,755 — 
Private Letter Ruling EDIT1 year18,850 — 
Generation plant major maintenance, excluding Colstrip
1 to 8 years
12,094 10,494 
Snoqualmie licensing operating and maintenance costs(c)7,446 7,435 
Mint Farm ownership and operating costs3.3 years6,318 8,318 
Washington Commission electric vehicleN/A6,109 3,641 
Water heater rental property lossN/A5,725 6,973 
Colstrip major maintenance(d)4,035 4,335 
Washington Commission COVID-19 N/A3,657 — 
Energy conservation costs(a)3,573 8,009 
Various other regulatory assets(a)15,422 10,719 
Total PSE regulatory assets$952,539 $918,107 
Deferred income taxes (e)
N/A(866,541)(953,987)
Cost of removal(f)(563,129)(508,707)
Repurposed production tax creditsN/A(134,270)(79,581)
PGA unrealized gainN/A(60,728)(4,925)
Decoupling liability
Less than 2 years
(36,506)(16,448)
Treasury grants2 years(22,476)(43,164)
Green directN/A(13,194)(14,313)
Gain on Sale ShuffletonN/A(4,892)(11,131)
Production tax credits(g)— (47,094)
Various other regulatory liabilities(a)(7,725)(5,871)
Total PSE regulatory liabilities(1,709,461)(1,685,221)
PSE net regulatory assets (liabilities)$(756,922)$(767,114)
__________________
(a)Amortization periods vary depending on timing of underlying transactions.
(b)Decoupling deferrals and interest includes a 24 month GAAP reserve of $3.0 million and $8.0 million for December 31, 2021 and 2020, respectively.
(c)The FERC license requires PSE to incur various O&M expenses over the life of the 40 year and 50 year license for Snoqualmie and Baker, respectively. The regulatory asset represents the net present value of future expenditures and will be offset by actual costs incurred.
(d)Amortization to be determined in a future rate filing.
(e)For additional information, see Note 14,"Income Taxes" to the consolidated financial statements included in Item 8 of this report.
(f)The balance is dependent upon the cost of removal of underlying assets and the life of utility plant.
(g)Amortize as PTCs are utilized on PSE's tax return.
Puget EnergyRemaining Amortization PeriodDecember 31,
(Dollars in Thousands)20212020
Total PSE regulatory assets(a)$952,539 $918,107 
Puget Energy acquisition adjustments:
Regulatory assets related to power contracts
4 to 31 years
9,689 11,728 
Total Puget Energy regulatory assets962,228 929,835 
Total PSE regulatory liabilities(a)(1,709,461)(1,685,221)
Puget Energy acquisition adjustments:
Deferred income taxes565 713 
Regulatory liabilities related to power contracts
4 to 31 years
(80,934)(95,774)
Various other regulatory liabilitiesVaries(1,264)(1,264)
Total Puget Energy regulatory liabilities(1,791,094)(1,781,546)
Puget Energy net regulatory asset (liabilities)$(828,866)$(851,711)
____________________
(a)Puget Energy’s regulatory assets and liabilities include purchase accounting adjustments under ASC 805.

If the Company determines that it no longer meets the criteria for continued application of ASC 980, the Company would be required to write-off its regulatory assets and liabilities related to those operations not meeting ASC 980 requirements. Discontinuation of ASC 980 could have a material impact on the Company's financial statements.
In accordance with guidance provided by ASC 410, “Asset Retirement and Environmental Obligations (ARO),” PSE reclassified from accumulated depreciation to a regulatory liability $563.1 million and $508.7 million in 2021 and 2020, respectively, for the cost of removal of utility plant.  These amounts are collected from PSE’s customers through depreciation rates.

General Rate Case Filing
PSE filed a general rate case (GRC) which includes a three year multiyear rate plan with the Washington Commission on January 31, 2022, requesting an overall increase in electric and natural gas rates of 13.6% and 13.0% respectively in 2023; 2.5% and 2.3%, respectively in 2024; and 1.2% and 1.8%, respectively, in 2025. PSE requested a return on equity of 9.9% in all three rate years. PSE requested an overall rate of return of 7.39% in 2023; 7.44% in 2024; and 7.49% in 2025. The filing requests recovery of forecasted plant additions through 2022 as required by RCW 80.28.425 as well as forecasted plant additions through 2025, the final year of the multiyear rate plan. The next phase of the filing will be to establish a procedural calendar for the adjudication of the case.
PSE filed a GRC with the Washington Commission on June 20, 2019, requesting an overall increase in electric and natural gas rates of 6.9% and 7.9% respectively. On July 8, 2020, the Washington Commission issued its order on PSE’s GRC. The ruling provided for a weighted cost of capital of 7.39% or 6.8% after-tax, and a capital structure of 48.5% in common equity with a return on equity of 9.4%. The order also resulted in a combined net increase to electric of $29.5 million, or 1.6%, and to natural gas of $36.5 million, or 4.0%. However, the Washington Commission extended the amortization of certain regulatory assets, PSE’s electric decoupling deferral, and PSE’s PGA deferral to mitigate the impact of the rate increase in response to the economic uncertainty created by the COVID-19 pandemic. This reduced the electric revenue increase to approximately $0.9 million, or 0.05% and the natural gas increase to $1.3 million, or 0.15% and became effective October 15, 2020 and October 1, 2020, respectively.
On August 6, 2020, PSE filed a petition for judicial review with the Superior Court of the State of Washington for King County challenging the portion of the final order that requires PSE to pass back to customers the reversal of plant-related excess deferred income taxes in a manner that may deviate from the Internal Revenue Service (IRS) normalization and consistency rules.
PSE reviewed the original Washington Commission order including the ramifications of certain tax issues and requested a Private Letter Ruling (PLR) with the IRS regarding this matter. On October 7, 2020, PSE, the Washington Commission and interveners agreed to dismiss the petition for judicial review. The agreement was based on a commitment from the Washington Commission that if the IRS ruling finds that the Washington Commission’s methodology for reversing plant-related excess deferred income taxes is impermissible, the Washington Commission would open a proceeding to review and enact the changes
required by the IRS ruling. There was approximately $25.6 million in annual revenue requirement related to the 2019 GRC, which PSE requested it be allowed to track and recover.
On July 30, 2021, the IRS issued a PLR to PSE which concludes that the Washington Commission’s methodology for reversing plant-related excess deferred income taxes is an impermissible methodology under the IRS normalization and consistency rules. The PLR requires adjustments to PSE's rates to bring PSE back into compliance with IRS rules. Accordingly, on September 28, 2021, the Washington Commission issued an order amending their order previously issued on July 8, 2020, to correct for items which were determined to be impermissible under IRS normalization and consistency rules as detailed in the PLR. To reflect the impact of the PLR, PSE has recorded a regulatory asset and additional revenues of $24.5 million in its operating results through December 31, 2021, of which $5.6 million was collected from customers. Thus, the annualized overall rate impact is an increase of $15.8 million, or 0.7%, for electric and $3.1 million, or 0.3%, for natural gas for a total of $18.9 million with rates effective October 1, 2021. This led to an overall annualized net increase to electric rates of $77.1 million, or 3.7%, an increase of $17.5 million above the $59.6 million granted in the revised final order. The order also led to an overall annualized net increase to natural gas rates of $45.3 million, or 5.9%, an increase of $2.4 million above the $42.9 million granted in the revised final order. The Washington Commission maintained adjustments that mitigated the impacts of the rate increases in response to the economic instability created by the COVID-19 pandemic, which reduced the electric revenue increase to approximately $48.3 million, or 2.3%, and the natural gas increase to $4.9 million, or 0.6%.

Power Cost Only Rate Case
On December 9, 2020, PSE filed its 2020 power cost only rate case (PCORC). The filing proposed an increase of $78.5 million (or an average of approximately 3.7%) in the Company's overall power supply costs with an anticipated effective date in June 2021. On February 2, 2021, PSE supplemented the PCORC to update its power costs, leading to a requested increase from $78.5 million to $88.0 million (or an average of approximately 4.1%).
On March 2, 2021, the parties to the PCORC reached an unopposed multiparty settlement in principle. The settlement resulted in an estimated revenue increase of $65.3 million or 3.1%. A term of the settlement requires PSE to include in its next GRC (or another proceeding in 2022) the issue of whether the PCORC should continue, and further prohibits PSE from filing another PCORC before this issue is litigated. On June 1, 2021, the Washington Commission issued its Final Order approving and adopting the settlement and authorizing and requiring a power cost update through a compliance filing. On June 17, 2021, PSE filed a compliance filing with the Washington Commission with a revenue increase of $70.9 million or 3.3% due to the update on power costs with rates effective July 1, 2021.

Decoupling Filings
On July 8, 2020, the Washington Commission issued the final order in Dockets UE-190529 and UG-190530, which instructed PSE to extend the collection of amortization balances for electric decoupling delivery and fixed power cost sections originally filed through the annual May 2020 decoupling filing. The extension requires PSE to move amortization balances for electric decoupling as of August 31, 2020 to be collected from customers for a two-year period, instead of the originally approved one-year period. Additionally, through approving the electric cost of service, the final order approved the re-allocation of decoupling balances from Schedule 40 to the remaining electric decoupling groups.
On December 23, 2020, the Washington Commission approved PSE’s filing to update Schedule 142 decoupling amortization rates, with an effective date of January 1, 2021, by zeroing out rates still effective past October 15, 2020 on tariff sheet Schedule 142-H, which was replaced by rates on tariff sheet Schedule 142-I effective October 15, 2020. PSE included a true up of the over-collection amounts for the period of October 15, 2020 through December 31, 2020 in PSE’s annual May 2021 decoupling filing.
On June 1, 2021, the Washington Commission approved the multi-party settlement agreement which was filed within PSE’s PCORC filing. As part of this settlement agreement, the electric annual fixed power cost allowed revenue was updated to reflect changes in the approved revenue requirement. The changes took effect on July 1, 2021.
On September 28, 2021, the Washington Commission approved 2019 GRC filing updated to PLR changes. As part of this filing, the annual electric and gas delivery cost allowed revenue was updated to reflect changes in the approved revenue requirement. The changes took effect on October 1, 2021.
On December 31, 2021, PSE performed an analysis to determine if electric and natural gas decoupling revenue deferrals would be collected from customers within 24 months of the annual period, per ASC 980.  If not, for GAAP purposes only, PSE would need to record a reserve against the decoupling revenue and regulatory asset balance.  Once the reserve is probable of collection within 24 months from the end of the annual period, the reserve can be recognized as decoupling revenue. The analysis indicated that $3.0 million of electric deferred revenue will not be collected within 24 months of the annual period; therefore a reserve adjustment was booked to 2021 electric decoupling revenue. Natural gas deferred revenue will be collected within 24 months of the annual period; therefore, no reserve adjustment was booked to 2021 natural gas decoupling revenue. This compares to $8.0 million of electric deferred revenue not being collected within 24 months of the annual period in 2020;
therefore, a reserve adjustment was booked to 2020 electric decoupling revenue and natural gas deferred revenue would be collected within 24 months of the annual period; therefore no reserve adjustment was booked to 2020 natural gas decoupling revenue.

Power Cost Adjustment Mechanism
PSE currently has a PCA mechanism that provides for the deferral of power costs that vary from the “power cost baseline” level of power costs. The “power cost baseline” levels are set, in part, based on normalized assumptions about weather and hydroelectric conditions.  Excess power costs or savings are apportioned between PSE and its customers pursuant to the graduated scale set forth in the PCA mechanism and will trigger a surcharge or refund when the cumulative deferral trigger is reached.
Effective January 1, 2017, the following graduated scale is used in the PCA mechanism:

Company’s ShareCustomers' Share
Annual Power Cost VariabilityOverUnderOverUnder
Over or Under Collected by up to $17 million100 %100 %— %— %
Over or Under Collected by between $17 million - $40 million35 50 

65 50 
Over or Under Collected beyond $40 + million10 10 

90 90 

For the year ended December 31, 2021, in its PCA mechanism, PSE under recovered its allowable costs by $68.0 million of which $36.7 million was apportioned to customers and $1.7 million of interest was accrued on the deferred customer balance. This compares to an under recovery of allowable costs of $76.1 million, for the year ended December 31, 2020, of which $44.0 million was apportioned to customers and accrued $2.0 million of interest on the total deferred customer balance. The under recovery in 2020 was included in the Power Cost Adjustment Clause filing, mentioned below.

Power Cost Adjustment Clause Filing
On July 8, 2020, the Washington Commission issued the final order in Dockets UE-190529 and UG-190530, which instructed PSE to remove Schedule 95 collection on decoupling allowed rates for Microsoft Special Contracts, which will be included in allowed rates under the Decoupling Schedule 142 effective October 15, 2020.
PSE exceeded the $20.0 million cumulative deferral balance in its PCA mechanism in 2020. The surcharging of deferrals can be triggered by the Company when the balance in the deferral account is a credit of $20.0 million or more. During 2020, actual power costs were higher than baseline power costs, thereby creating an under-recovery of $76.1 million. Under the terms of the PCA’s sharing mechanism for under-recovered power costs, PSE absorbed $32.1 million of the under-recovered amount, and customers were responsible for the remaining $44.0 million, or $46.0 million including interest. PSE filed to recover the deferred balance in Docket UE-210300, effective December 1, 2021, and the Washington Commission approved PSE’s request on September 30, 2021.

Purchased Gas Adjustment Mechanism
On October 29, 2020, the Washington Commission approved PSE’s request for November 2020 PGA rates in Docket UG-200832, effective November 1, 2020. As part of that filing, PSE requested PGA rates increase annual revenue by $32.6 million, while the new tracker rates increased annual revenue by $37.4 million; this was in addition to continuing the collection on the remaining balance of $69.4 million under Supplemental Schedule 106B.
On October 28, 2021, the Washington Commission approved PSE's request for November 2021 PGA rates in Docket UG-210721, effective November 1, 2021. As part of that filing, PSE requested an annual revenue increase of $59.1 million; where PGA rates, under Schedule 101, increase annual revenue by $80.6 million, and the tracker rates under Schedule 106, decrease annual revenue by $21.5 million. Those rate increases will be set in addition to continuing the collection on the remaining balance of $69.4 million under Supplemental Schedule 106B.
The following table presents the PGA mechanism balances and activity at December 31, 2021 and December 31, 2020:
 
Puget Sound Energy
(Dollars in Thousands)At December 31,At December 31,
PGA receivable balance and activity20212020
PGA receivable beginning balance$87,655 $132,766 
Actual natural gas costs364,775 314,792 
Allowed PGA recovery(396,236)(363,886)
Interest1,741 3,983 
PGA receivable ending balance$57,935 $87,655 

Get to Zero Depreciation Deferral
On April 10, 2019, PSE filed an accounting petition with the Washington Commission, requesting authorization to defer depreciation expense associated with Get To Zero (GTZ) projects that were placed in service after June 30, 2018. The GTZ project consists of a number of short-lived technology upgrades. The depreciation expense associated with the GTZ projects with lives of 10 years or less that were placed in service after June 30, 2018, were deferred beginning May 1 per the petition request. For the year ended December 31, 2021 and December 31, 2020, PSE deferred $6.6 million and $2.8 million of depreciation expense for GTZ, respectively. In addition to the deferral of depreciation expense, PSE had also requested to defer carrying charges on the GTZ deferral, to be calculated utilizing the Company’s currently authorized after-tax rate of return, or 6.89%. The ruling authorized PSE to amortize deferred GTZ expenses as proposed in the original GRC filing. The ruling also allows continued deferral of the depreciation expense associated with GTZ investments not already approved for recovery with a book life of 10 years or less, through PSE's next GRC. Finally, the final order set the rate at which PSE could defer and recover carrying charges from PSE’s authorized rate of return to the quarterly interest rate established by the FERC.

Crisis Affected Customer Assistance Program
On April 6, 2020, PSE filed with the Washington Commission revisions to its currently effective Tariff WN U-60. The purpose of this filing is to incorporate into PSE’s low-income tariff a new temporary bill assistance program, Crisis Affected Customer Assistance Program (CACAP), to mitigate the economic impact of the COVID-19 pandemic on PSE’s customers. CACAP would allow PSE customers facing financial hardship due to COVID-19 to receive up to $1,000 in bill assistance. The program puts to immediate use $11.0 million in unspent low income funds from prior years, and supplements other forms of financial assistance. The program does not require an increase to rates and is compatible with other low income programs. Based on the COVID-19 pandemic and resulting state of emergency, the Washington Commission allowed the tariff revisions to become effective on April 13, 2020. PSE made an additional filing on July 21, 2020 to increase the amount of electric funds available for distribution by $4.5 million under the CACAP program.
On March 28, 2021, the Washington Commission approved PSE’s second Crisis Affected Customer Assistance Program (CACAP-2), effective April 12, 2021. CACAP-2 will provide up to $2,500 in bill assistance per year for each qualifying low-income household. The CACAP-2 total program budget is $20.0 million for electric customers and $7.7 million for natural gas customers. Natural gas funds may be used for electric bills if necessary. Customers may apply for CACAP-2 more than once during the 12-month program year of October-September.
On October 15, 2021, PSE submitted for the Washington Commission’s review and approval a Supplemental CACAP filing to continue assistance for PSE customers facing financial hardship due to COVID-19. The Supplemental CACAP would utilize carry-over funds not expended in any prior years under PSE’s Schedule 129 Home Energy Lifeline Program. The Supplemental CACAP benefits, for both electric and natural gas residential customers, would be a combined total of $34.5 million and be capped at $23.7 million and $10.8 million, respectively. Additionally, the Supplemental CACAP filing proposed to revise the CACAP-2 total program budget to $27.7 million for electric customers (instead of $20.0 million for electric customers and $7.7 million for natural gas customers). The Supplemental CACAP budget for natural gas customers of $10.8 million would be used for both the CACAP-2 program and the Supplemental CACAP program benefits.
The Supplemental CACAP benefits would be available to PSE’s residential customers who have a past due balance on their PSE electric or natural gas service account and who have a total net household income which is at or below 200% of the federal poverty level guidelines, based on household, as determined by the Company. The Supplemental CACAP benefits would cover a qualifying residential customer’s past due balance, up to $2,500. PSE would apply the Supplemental CACAP benefits to qualifying residential service accounts automatically with an opt-out option. The Supplemental CACAP was
approved by the Washington Commission at the November 12, 2021 open meeting. Both CACAP-2 and Supplemental CACAP would be administered until funds are exhausted.

Storm Loss Deferral Mechanism
The Washington Commission has defined deferrable weather-related events and provided that costs in excess of the annual cost threshold may be deferred for qualifying damage costs that meet the modified Institute of Electrical and Electronics Engineers outage criteria for system average interruption duration index. For the year ended December 31, 2021, PSE incurred $51.4 million in weather-related electric transmission and distribution system restoration costs, of which the Company deferred $40.9 million and $0.2 million as regulatory assets related to storms that occurred in 2021 and 2020, respectively. This compares to $21.8 million incurred in weather-related electric transmission and distribution system restoration costs for the year ended December 31, 2020, of which the Company deferred $11.2 million as regulatory assets related to storms that occurred in 2020. Under the 2017 GRC Order, the storm loss deferral mechanism approved the following: (i) the cumulative annual cost threshold for deferral of storms under the mechanism at $10.0 million; and (ii) qualifying events where the total qualifying cost is less than $0.5 million will not qualify for deferral and these costs will also not count toward the $10.0 million annual cost threshold.

Environmental Remediation
The Company is subject to environmental laws and regulations by the federal, state and local authorities and is required to undertake certain environmental investigative and remedial efforts as a result of these laws and regulations.  The Company has been named by the Environmental Protection Agency (EPA), the Washington State Department of Ecology and/or other third parties as potentially responsible at several contaminated sites and former manufactured gas plant sites.  In accordance with the guidance of ASC 450, “Contingencies,” the Company reviews its estimated future obligations and will record adjustments, if any, on a quarterly basis.  Management believes it is probable and reasonably estimable that the impact of the potential outcomes of disputes with certain property owners and other potentially responsible parties will result in environmental remediation costs of $69.0 million for natural gas and $48.6 million for electric.  The Company believes a significant portion of its past and future environmental remediation costs are recoverable from insurance companies, from third parties or from customers under a Washington Commission order.  The Company is also subject to cost-sharing agreements with third parties regarding environmental remediation projects in Seattle, Tacoma, Everett, and Bellingham, Washington. As of December 31, 2021, the Company’s share of future remediation costs is estimated to be approximately $62.1 million. The Company's deferred electric environmental costs are $52.2 million and $51.8 million at December 31, 2021 and 2020, respectively, net of insurance proceeds. The Company's deferred natural gas environmental costs are $75.8 million and $50.9 million at December 31, 2021 and 2020, respectively, net of insurance proceeds.