XML 22 R11.htm IDEA: XBRL DOCUMENT v3.21.2
PROPERTY, PLANT, AND EQUIPMENT
9 Months Ended
Sep. 30, 2021
Property, Plant and Equipment [Abstract]  
PROPERTY, PLANT, AND EQUIPMENT PROPERTY, PLANT, AND EQUIPMENT
During a significant rain event in May 2020, an underground steam tunnel in downtown Milwaukee flooded and steam vented into our PSB. The damage to the building from the flooding and steam was extensive and requires significant repairs and restorations. As of September 30, 2021, we have incurred $93.5 million of costs related to these repairs and restorations. We received $20.0 million of insurance proceeds in 2020 to cover a portion of these costs and $61.0 million was recorded in accounts receivable on our balance sheet as of September 30, 2021 for future insurance recoveries. The remaining $12.5 million of costs were included in other operation and maintenance expense in 2020 as we do not intend to seek recovery of these costs.

In June 2021, we received approval from the PSCW to restore the PSB and to defer the project costs, net of insurance proceeds, as a component of rate base. As such, we do not currently expect a significant impact to our future results of operations, and although we may experience differences between periods in the timing of cash flows, we also do not currently expect a significant impact to our long-term cash flows from this event.