EX-99.1 2 dnn-20241231xex99d1.htm EXHIBIT-99.1

Exhibit 99.1

Graphic

Denison Mines Corp.

2024 Annual Information Form

March 28, 2025


About this Annual Information Form

This annual information form (“AIF”) is dated March 28, 2025. Information in this AIF is stated as at December 31, 2024 unless specified otherwise.

In this AIF, references to the “Company” or “Denison” refer to Denison Mines Corp., its subsidiaries and affiliates, or any one of them, as applicable.

This AIF has been prepared in accordance with Canadian securities laws and contains information regarding Denison’s history, business, mineral reserves and resources, the regulatory environment in which Denison does business, the risks that Denison faces and other important information for Denison’s shareholders.

Financial Information

Unless otherwise specified, all dollar amounts referred to in this AIF are stated in Canadian dollars (“CAD”). References to “US$” or “USD” mean United States dollars.

Financial information is generally derived from consolidated financial statements that have been prepared in accordance with International Financial Reporting Standards as issued by the International Accounting Standards Board.

Table of Contents

2024 ANNUAL INFORMATION FORM    1


Caution about Forward-Looking Information

Certain information contained in this AIF and the documents incorporated by reference concerning the business, operations and financial performance and condition of Denison constitutes forward-looking information within the meaning of the United States Private Securities Litigation Reform Act of 1995 and similar Canadian legislation.

Generally, the use of words and phrases like “plans”, “expects”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes”, or the negatives and/or variations of such words and phrases, or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will” “be taken”, “occur”, “be achieved” or “has the potential to” and similar expressions are intended to identify forward-looking information.

Forward-looking information involves known and unknown risks, uncertainties, material assumptions and other factors that may cause actual results or events to differ materially from those expressed or implied by such forward-looking statements. Denison believes that the expectations and assumptions reflected in this forward-looking information are reasonable, but no assurance can be given that these expectations will prove to be correct. Forward-looking information should not be unduly relied upon. This information speaks only as of the date of this AIF, and Denison will not necessarily update this information, unless required by securities laws.

2024 ANNUAL INFORMATION FORM    2


Examples of Forward-Looking Information

This AIF contains forward-looking information in a number of places, including statements pertaining to Denison’s:

expectations regarding capital and uses of capital

    

expectations regarding additions to its mineral reserves and resources through acquisitions and exploration
operational and business outlook, including exploration, evaluation and development plans and objectives

expectations regarding future uranium prices and/or applicable foreign exchange rates
plans for capital expenditure programs, exploration and development expenditures and reclamation costs and timing

expectations about 2025 and future market prices, production costs, nuclear energy and global uranium supply and demand
results of its exploration programs

expectations regarding ongoing joint arrangements, Denisons share of same, and the operational and business outlook for projects Denison does not operate
results of the Phoenix FS and Gryphon PFS Update and plans with for the EA, regulatory and project development process (as terms are defined below)

expectations regarding toll milling revenues generated by McClean Lake mill, and the relationships with its contractual partners with respect thereto
technical assessments and preliminary economic assessments of its properties, and related plans and objectives

future royalty and tax payments and rates
expectations regarding the process for and receipt of regulatory approvals, permits and licences under governmental and other applicable regulatory regimes

expectations regarding possible impacts of litigation and regulatory actions
estimates of the Companys mineral reserves and mineral resources

Statements relating to “mineral resources” are deemed to be forward-looking information, as they involve the implied assessment, based on certain estimates and assumptions that the mineral resources described can be profitably produced in the future.

2024 ANNUAL INFORMATION FORM    3


Material Risks

Denison’s actual results could differ materially from those anticipated. Management has identified the following risk factors which could have a material impact on the Company or the trading price of its common shares (“Shares”):

the risk of inadequate funding for operations, given the capital-intensive nature of the mining industry

    

the speculative nature of exploration and development projects, including risks related to technical or economic feasibility of projects and regulatory approvals
history of, and expectations for continued, negative cash flow

the risks of, and market impacts on, developing mineral properties
global financial conditions, including market volatility and global inflation, and related operational risks

risks associated with the selection of novel mining methods
the impact of uranium price volatility on the valuation of Denisons assets, including mineral reserves and resources, and operational outlook

competition for properties
dependence on obtaining licenses and permits

risk of challenges to property title and/or contractual interests in Denisons properties
extensive regulatory and policy oversight and related risks

the risk of failure by Denison to meet its obligations to its creditors
uncertainty regarding engagement with Canadas First Nations and Métis

change of control restrictions
reliance on third parties

uncertainty as to reclamation and decommissioning liabilities and timing
challenges in maintaining qualified and experienced employees upon which the Companys operations will depend

potential for technological innovation rendering Denisons products and services obsolete
risk of disagreements or disputes with Denisons joint venture counterparties that could disrupt operations

liabilities inherent in mining operations and the adequacy of insurance coverage
risk that public health emergencies could impact business and operations plans

containment management of waste materials
compliance costs and risks of non-compliance with environment, health, safety and other regulatory regimes

the ability of Denison to ensure compliance with anti-bribery and anti-corruption laws
health and safety hazards

the uncertainty regarding risks posed by climate change
the imprecision of mineral reserve and resource estimates

the reliance of the Company on its information systems and the risk of cyber-attacks on those systems
global demand fluctuations and international trade policies and restrictions

maintenance of key infrastructure and equipment

2024 ANNUAL INFORMATION FORM    4


uncertainty regarding public acceptance of nuclear energy and competition from other energy sources

potential conflicts of interest for the Companys directors who are engaged in similar businesses
reliance on other operators of certain Company properties

limitations of disclosure and internal controls
reliance on uranium storage facilities

volatility in the market price of the Shares
devaluation of any physical uranium held by the Company, and risk of losses, due to fluctuations in the price of uranium and/or foreign exchange rates

the risk of dilution from future equity financings
the risk of failure to realize benefits from transactions

the potential influence of Denisons largest shareholder, Korea Electric Power Corporation (KEPCO) and its subsidiary, Korea Hydro & Nuclear Power (KHNP)
the risk of inability to exploit, expand or replace mineral reserves and resources

Risks for United States investors

The risk factors listed above are discussed in more detail later in this AIF (see “Risk Factors”). The risk factors discussed in this AIF are not, and should not be construed as being, exhaustive.

Material Assumptions

The forward-looking statements in this AIF and the documents incorporated by reference are based on material assumptions made by management of the Company, including the following, which may prove to be incorrect:

the budget for 2025, including plans and estimated costs for exploration, evaluation, and development and other factors
Denison’s ability to execute its business plans for 2025 and beyond and realize on the expected results from mining, development, and exploration activities.
Denison’s expectations regarding the plans and budgets, and ability to execute, with respect to its joint venture interests, particularly for which it is not the operator, including Orano Canada’s plans for the restart of mining at McClean Lake
the ability of the Company to, and the means by which it can, raise additional capital to advance exploration, evaluation, development, and mining objectives
Denison’s ability to obtain all necessary regulatory approvals, permits and licences for its planned activities under governmental and other applicable regulatory regimes
expectations regarding the demand for, and supply of, uranium, the outlook for long-term contracting, changes in regulations, public perception of nuclear power, and the construction of new and relicensing of existing nuclear power plants
expectations regarding spot and long-term prices and realized prices for uranium
expectations regarding Denison’s holdings of physical uranium and future sales of uranium production, including commercial strategies
expectations regarding tax rates, currency exchange rates and interest rates

2024 ANNUAL INFORMATION FORM    5


Denison’s decommissioning and reclamation obligations and the status and ongoing maintenance of agreements with third parties with respect thereto
mineral reserve and resource estimates, and the assumptions upon which they are based
Denison’s, and its contractors’, ability to comply with current and future environmental, safety and other regulatory requirements and to obtain and maintain required regulatory approvals
Denison’s operations are not significantly disrupted as a result of social or political activism, natural disasters, public health emergencies, governmental or political actions, litigation or arbitration proceedings, equipment or infrastructure failure, labour shortages, transportation disruptions or accidents, or other development or exploration risks

Cautionary Notes to U.S. Investors Concerning Resource and Reserve Estimates

As a foreign private issuer reporting under the multijurisdictional disclosure system adopted by the United States, the Company has prepared this AIF in accordance with Canadian securities laws and standards for reporting of mineral resource estimates, which differ in some respects from United States standards. In particular, and without limiting the generality of the foregoing, the terms “measured mineral resources,” “indicated mineral resources,” “inferred mineral resources,” and “mineral resources” used or referenced in this AIF are Canadian mineral disclosure terms as defined in accordance with National Instrument 43-101 — Standards of Disclosure for Mineral Projects (“NI 43-101”) under the guidelines set out in the Canadian Institute of Mining, Metallurgy and Petroleum Standards for Mineral Resources and Mineral Reserves, Definitions and Guidelines, May 2014 (the “CIM Standards”). The Securities and Exchange Commission (the “SEC”) recognizes estimates of “measured mineral resources”, “indicated mineral resources” and “inferred mineral resources”. In addition, the SEC’s definitions of “proven mineral reserves” and “probable mineral reserves” are “substantially similar” to the corresponding definitions under the CIM Standards definition that are required under NI 43-101. Investors are cautioned that while the above terms are “substantially similar” to the corresponding CIM Standards definition, there are differences between the definitions under the United States Securities Exchange Act of 1934, as amended (the “U.S. Exchange Act”) and the CIM Standards definition. Accordingly, there is no assurance any mineral reserves or mineral resources that the Company may report as “proven mineral reserves”, “probable mineral reserves”, “measured mineral resources”, “indicated mineral resources” and “inferred mineral resources” under NI 43-101 would be the same had the Company prepared the mineral reserve or mineral resource estimates under the standards adopted under the U.S. Exchange Act. For the above reasons, information contained in the AIF and other documents incorporated by reference herein containing descriptions of mineral deposits may not be comparable to similar information made public by U.S. companies subject to the reporting and disclosure requirements under the United States federal securities laws and the rules and regulations thereunder. Additionally, investors are cautioned that “inferred mineral resources” have a great amount of uncertainty as to their existence, and great uncertainty as to their economic feasibility. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or other economic studies, except in limited circumstances. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. The term “resource” does not equate to the term “reserves”. Investors should not assume that all or any part of measured or indicated mineral resources will ever be converted into mineral reserves. Investors are also cautioned not to assume that all or any part of an inferred mineral resource exists or is economically mineable.

2024 ANNUAL INFORMATION FORM    6


Graphic

About Denison

Denison Mines Corp. is engaged in uranium exploration, development and mining. The registered and head office of Denison is located at 1100 – 40 University Avenue, Toronto, Ontario, M5J 1T1, Canada. Denison’s website address is www.denisonmines.com.

The Shares are listed on the Toronto Stock Exchange (“TSX”) under the symbol “DML” and on the NYSE American under the symbol “DNN.”

Computershare Investor Services Inc. acts as the registrar and transfer agent for the Shares. The address for Computershare Investor Services Inc. is 100 University Avenue, 8th Floor, Toronto, ON, M5J 2Y1, Canada, and the telephone number is 1-800-564-6253.

Denison is a reporting issuer in each of the Canadian provinces and territories. The Shares are also registered under the U.S. Exchange Act, and Denison files periodic reports with the SEC.

Acknowledgement

Denison respectfully acknowledges that its business operates in Canada on lands that are in the traditional territory of Indigenous peoples. Denison’s activities encompass the entire mining life cycle, from early-stage exploration to advanced project evaluation, construction, operation, closure and restoration – with the potential for activities to span many decades. As such, Denison is committed to collaborating with Indigenous peoples and communities to build long-term, respectful, trusting, and mutually beneficial relationships and aspires to avoid any adverse impacts of Denison’s activities and operations.

Denison has adopted an Indigenous Peoples Policy, which reflects the Company’s recognition of the important role of Canadian business in the process of reconciliation with Indigenous peoples in Canada and outlines the Company’s commitment to take action towards advancing reconciliation. A copy of the Indigenous Peoples Policy is available on Denison’s website, in Déne, Cree, English and French languages.

Denison’s Head Office is located in the traditional territory of many nations, including the Mississaugas of the Credit, the Anishnabeg, the Chippewa, the Haudenosaunee and the Wendat peoples, and is now home to many diverse First Nations, Inuit and Métis peoples. Denison also acknowledges that Toronto is covered by Treaty 13 with the Mississaugas of the Credit.

Denison’s mining and mineral exploration operations in Saskatchewan, including its office in Saskatoon and various project interests in northern Saskatchewan, are located in regions covered by Treaty 6, Treaty 8 and Treaty 10, which encompass the traditional lands of the Cree, Dakota, Déne, Lakota, Nakota, Saulteaux, within the homeland of the Métis and within Nuhenéné.

Denison’s flagship Wheeler River uranium project, in particular, is located in northern Saskatchewan within the boundaries of Treaty 10, in the traditional territory of English River First Nation, in the homeland of the Métis and within Nuhenéné.

Denison’s legacy mines operations in the Elliot Lake region of northern Ontario are located within the boundaries of the Robinson Huron Treaty of 1850, signatories to which include the Serpent River First Nation.

2024 ANNUAL INFORMATION FORM    7


Denison’s Team

At the end of 2024, Denison had a total of 75 active employees, all of whom were employed in Canada. None of the Company’s employees are unionized.

Denison’s Structure

Denison conducts its business through a number of subsidiaries and joint arrangements. The following is a diagram depicting the corporate structure of Denison, its active subsidiaries and corporate and partnership joint arrangements, including the name, jurisdiction of incorporation and proportion of ownership interest in each, as at December 31, 2024.

Graphic

JCU (Canada) Exploration Company, Ltd. (“JCU”) is owned by Denison (50%) and UEX Corporation (“UEX”, 50%). UEX, a wholly-owned subsidiary of Uranium Energy Corp., is manager of JCU, and JCU’s operations are managed in accordance with a shareholders agreement between Denison, UEX and JCU.

As at the date hereof, the Waterbury Lake Uranium Limited Partnership (“WLULP”) is held by Denison (70.55%) and Korea Waterbury Uranium Limited Partnership (“KWULP”) (29.45%) as limited partners and Waterbury Lake Uranium Corporation (“WLUC”) (0.02%), as general partner.

The Formation of Denison Mines Corp.

The Denison name has a long history in the Canadian uranium mining industry. Based on company archives, Denison’s involvement in the uranium mining industry dates back to 1954, when a predecessor to modern Denison acquired uranium claims in the Elliot Lake region.

Modern Denison was established by articles of amalgamation as International Uranium Corporation (“IUC”) on May 9, 1997 pursuant to the Business Corporations Act (Ontario) (the “OBCA”). On December 1, 2006, IUC completed a plan of arrangement (the “IUC Arrangement”) with Denison Mines Inc. (“DMI”). Pursuant to the IUC Arrangement, all of the issued and outstanding shares of DMI were acquired in exchange for IUC’s shares. Effective December 1, 2006, IUC’s articles were amended to change its name to “Denison Mines Corp.”

2024 ANNUAL INFORMATION FORM    8


Denison subsequently completed a plan of arrangement with Energy Fuels Inc. in 2012 and filed articles of amalgamation on January 1, 2014, July 1, 2014 and July 3, 2014 in connection with Denison’s acquisitions of JNR Resources Inc. and Fission Energy Corp.

Denison Overview

Uranium Mining, Development, and Exploration

Denison’s uranium property interests are held directly by the Company and/or indirectly through DMI, Denison Waterbury Corp. and Denison AB Holdings Corp.

Focused in the Athabasca Basin Region of Saskatchewan

Denison’s Flagship Assets:

An effective 95% interest in, and operator of, the Wheeler River Uranium project (“Wheeler” or “Wheeler River”), which is host to the high-grade Phoenix and Gryphon uranium deposits – together representing the largest undeveloped uranium project in the infrastructure rich eastern Athabasca Basin.

Denison’s Extensive Portfolio of Other Uranium Properties:

A 70.55% interest in, and operator of, the Waterbury Lake project, which includes the Tthe Heldeth Túé (“THT”, formerly J Zone) and Huskie deposits.
A 22.50% interest in the McClean Lake uranium processing facility and uranium deposits, through its interest in the McClean Lake Joint Venture (“MLJV”) operated by Orano Canada Inc. (“Orano Canada”).
A 25.17% interest in the Midwest uranium project (“Midwest”), which is host to the Midwest Main and Midwest A deposits, through its interest in the Midwest Joint Venture (“MWJV”) operated by Orano Canada.
Through its 50% ownership of JCU, interests in various uranium project joint ventures in Canada, including the Millennium project (JCU 30.099%), the Kiggavik project (JCU 33.8118%) and Christie Lake (JCU 34.4508%).
An extensive portfolio of exploration properties located in the Athabasca Basin.

Toll Milling

Denison is a party to a toll-milling arrangement through its 22.50% interest in the MLJV, whereby ore is processed for the Cigar Lake Joint Venture (“CLJV”) at the McClean Lake processing facility (the “Cigar Toll Milling”). In February 2017, Denison completed a transaction (the “Ecora Transaction”) with Ecora Resources PLC (“Ecora”) and its wholly owned subsidiary Centaurus Royalties Ltd. to raise gross proceeds to Denison of $43,500,000. The Ecora Transaction monetized Denison’s future share of the Cigar Toll Milling, providing Denison with the financial flexibility to advance its interests in the Athabasca Basin, including the Wheeler River project. See “Denison’s Operations – Cigar Lake Toll Milling – Ecora Transaction”.

2024 ANNUAL INFORMATION FORM    9


Developments Over the Last Three Years

2022…

Project Developments – Wheeler River

In February, Denison announced that it completed three drill holes during the fall of 2021 to follow up on the discovery of high-grade uranium mineralization in drill hole GWR-045 at Wheeler River’s Phoenix deposit (“Phoenix”), which hole was located outside of the previously defined extent of the high-grade domain of Phoenix Zone A. All three follow-up holes returned intervals of high-grade uranium mineralization. The results were highlighted by drill hole GWR-049, which was expected to intersect a narrow high-grade interval according to then-current modeling, but instead returned 24.9% eU3O8 over 4.2 metres.

In July, Denison announced that it received approval from the Province of Saskatchewan to prepare, construct, and operate the facilities required to carry out the in-situ recovery (“ISR”) Feasibility Field Test (“FFT”) planned for the Phoenix deposit. The FFT was designed to use the existing commercial-scale ISR test pattern to perform a combined assessment of the Phoenix deposit’s hydraulic flow properties along with the leaching characteristics that had been assessed through the metallurgical core-leach testing program. The approval was granted by the Saskatchewan Minister of Environment and authorizes Denison to operate “pollutant control facilities”, which is typical for mining operations and allows for the management of material recovered from mineral extraction through to wastewater treatment, discharge, and storage (as applicable). The approval followed the completion of a process involving the review of and consultation on the Company’s permit application and supporting materials related to the FFT.

In August, the Company announced that it had received a Licence to Possess, Use, Store and Transfer a Nuclear Substance from the Canadian Nuclear Safety Commission (“CNSC”). With the receipt of this approval, the Company was fully permitted to operate the FFT facility and carry out the process of recovering a uranium bearing solution from the Phoenix ore body.

Also in August, Denison announced the substantial completion of extensive metallurgical test work to define the mechanical components for the planned Phoenix processing plant as part of the FS underway for Wheeler River. The test work confirmed the ability to produce a yellowcake product that meets industry standard ASTM C967-13 specifications.

In September, the Company reported the completion of the construction and wet commissioning of the lixiviant injection system for the FFT and commencement of the leaching phase of the FFT.

In October, the Company announced that it had successfully recovered uranium bearing solution from the ISR FFT at targeted rates and grades, indicating that the hydrogeological system at Phoenix was responding as expected with pH trends, flow characteristics, and uranium recovery meeting expectations. The preliminary results demonstrated the successful acidification of the test pattern and recovery of uranium using the ISR mining method. Given the highly successful results of the FFT, lixiviant injection ceased, and operations at the Phoenix FFT site transitioned from the leaching phase of the FFT to the neutralization phase.

Also in October, Denison announced a significant regulatory milestone for Wheeler River with the submission of the draft Environmental Impact Statement (“EIS”) to the Saskatchewan Ministry of Environment (“SKMOE”) and the CNSC as part of the Environmental Assessment (“EA”) process being undertaken in accordance with the requirements of the Canadian Environmental Assessment Act, 2012 (“CEAA 2012”) and the Saskatchewan Environmental Assessment Act. The EIS submission outlines the Company’s assessment of the potential effects, including applicable mitigation measures, of the proposed ISR uranium mine and processing plant planned for Wheeler River, and reflects several years of baseline environmental data collection, technical assessments, plus extensive engagement and consultation with Indigenous and non-Indigenous interested parties.

In November, Denison announced the CNSC had completed its conformity review of the draft EIS submitted for the proposed ISR uranium mine and processing plant. The CNSC determined the draft EIS met the requirements for the advancement of the EA process, and the federal technical review of the EIS commenced.

2024 ANNUAL INFORMATION FORM    10


In December, Denison announced highly successful results from long-term core leach metallurgical testing completed to further support the establishment of ISR production and recovery curves to be used in the Phoenix FS. The Company completed a long-term test of a representative intact core sample using specialized equipment to replicate in-situ leaching conditions of the Phoenix deposit. The results were highlighted by: (a) overall recovery of uranium in excess of 97%, demonstrating excellent recovery of uranium from intact high-grade core without the use of permeability enhancement; (b) average recovered solution uranium head grade of 18.3 grams per litre (“g/L”), exceeding the assumed 15 g/L uranium head grade being used in plant designs; (c) continuous intact core leach testing over a period of 377 days, with uranium recovery head grades consistently maintained above 5 g/L during the final stages of the production curve and then declining during the ramp-down stage; and (d) maximum recovered solution uranium head grade of 49.8 g/L achieved using similar lixiviant concentrations as to those used during the FFT.

And in December, Denison reported that the neutralization phase of the FFT had been successfully completed, advising that sampling of monitoring wells (“MWs”) around the FFT site confirmed the successful restoration of the leaching zone to environmentally acceptable pH conditions, as outlined in the applicable regulatory approvals for the FFT. The neutralization phase was initiated in mid-October, following the highly successful completion of the leaching phase of the FFT, and was designed to confirm certain environmental assessment assumptions and verify the efficiency and effectiveness of the neutralization process planned for ISR mining at Phoenix. The FFT was highlighted by the recovery of 14,400 pounds of U3O8 dissolved in solutions generated during the leaching and neutralization phases of the test. The final phase of the FFT, involving the management of the recovered solution, was undertaken in 2023.

Other Project Developments

In January, the Company announced that the CNSC approved an amendment to the operating licence for the MLJV and MWJV operations, which allows for the expansion of the McClean Lake Tailings Management Facility (“TMF”) and accepts the associated revised Preliminary Decommissioning Plan (“PDP”) and cost estimate. See “Denison’s Operations – McClean Lake Mill & Cigar Lake Toll Milling – Mill Licence” for more information.

In March, Denison reported that multiple new high-grade intercepts of unconformity-hosted uranium mineralization were discovered in the final three drill holes completed during the winter 2022 exploration program at the Waterfound property, operated by Orano Canada. Denison holds an effective 24.68% ownership interest in Waterfound through its direct interest in the joint venture and its 50% ownership of JCU. The results were highlighted by drill hole WF-68, which returned a broad zone of uranium mineralization, including a peak interval of 5.91% eU3O8 over 3.9 metres (0.05% eU3O8 cut-off) with a sub-interval grading 25.30% eU3O8 over 0.7 metres, located approximately 800 metres west, along the La Rocque Conductive Corridor, of the previously discovered high-grade mineralization (including 4.49% U3O8 over 10.53 metres) at the Alligator Zone.

In April, Denison completed the sale of 40,000 pounds of U3O8, representing the Company’s share of production from the patented Surface Access Borehole Resource Extraction (“SABRE”) mining method test mining program completed at the at the McClean Lake property in 2021. The uranium was sold at a price of $74.65 (US$59.25) per pound U3O8. The five-year test program was highlighted by the completion of the final stage of the program from May to September 2021 with four mining cavities successfully excavated to produce approximately 1,500 tonnes of high-value ore ranging in grade from 4% U3O8 to 11% U3O8. The program was concluded with no safety, environmental or radiological incidents and confirmed the ability to achieve key operating objectives associated with the test program – including targets for cavity diameter, rates of recovery, and mine production rates. The majority of the ore recovered from the test mining program was transferred to the McClean Lake mill, resulting in the production of approximately 176,000 pounds of U3O8 (Denison’s share: approximately 40,000 pounds of U3O8) in the fourth quarter of 2021.

In September, Denison announced that assays received from exploration drilling completed at McClean Lake during the winter of 2022 resulted in a significant expansion of the high-grade unconformity-hosted zone of uranium mineralization discovered in 2021 between the McClean South 8W and 8E pods. Ten drill holes completed during 2022 by Orano Canada returned notable uranium mineralization, including drill hole MCS-58, which returned 2.96% U3O8 over 15.5 metres, including 24.49% U3O8 over 1.5 metres, located approximately 54 metres to the southeast of drill hole MCS-34, which was completed in 2021 and returned a mineralized interval of 8.67% U3O8 over 13.5 metres. Overall, the results from 2022 have successfully expanded the footprint of the mineralized zone to approximately 180 metres in strike length.

2024 ANNUAL INFORMATION FORM    11


Also in September, Denison announced that uranium mineralization was encountered in three of the seven drill holes completed during the summer exploration program at Waterfound, highlighted by drill hole WF-74A, which intersected 4.75% eU3O8 over 13.3 metres, including a sub-interval grading 25.23% eU3O8 over 0.5 metres. The mineralized intersection from WF-74A represents the best mineralized hole drilled on the Waterfound property to date and highlights the potential for the discovery of additional high-grade uranium mineralization further along strike to the west of the Alligator Zone.

Financing Developments

In January, the Company amended and extended its credit facility with the Bank of Nova Scotia (the “Credit Facility”) to January 31, 2023.

During 2022, the Company issued 11,042,862 Shares under an at-the-market equity offering program (the “2021 ATM Program”) qualified by a short form base shelf prospectus filed with the securities regulatory authorities in each of the provinces and territories of Canada and a registration statement on Form F-10, as amended (SEC File No. 333-258939). The Shares were issued on the market at an average price of $1.83 per Share for aggregate gross proceeds of $20,200,000. Denison also recognized issue costs of $599,000 related to the 2021 ATM Program Share issuances which includes $404,000 of commissions and $195,000 other costs associated with the maintenance of the 2021 ATM Program.

In December, the Company amended the terms of the Credit Facility to extend the maturity date to January 31, 2024, and to increase the credit available under the facility to cover additional standby letters of credit with respect to environmental obligations associated with the FFT activities at Wheeler River.

Corporate Developments

Also in January, the Company executed a Repayment Schedule Agreement (the “Repayment Agreement”) with Uranium Industry a.s. (“UI”) pursuant to which the parties negotiated the repayment of the debt owing from UI to Denison with respect to the contingent proceeds of Denison’s sale to UI of its interest in the Gurvan Saihan Joint Venture in Mongolia in 2015 (the “Mongolia Transaction”). In accordance with the Repayment Agreement, the Company received aggregate installment payments in 2022 of US$4,800,000.

And in January, Denison announced the appointment of Ms. Laurie Sterritt to the Board of Directors of the Company (the “Board”) and the appointment of Mr. Kevin Himbeault as the Company’s Vice President Plant Operations & Regulatory Affairs.

In February, Mr. Jun Gon Kim resigned from the Board. Mr. Yun Chang Jeong joined the Board in early March, filling the vacancy created by Mr. Kim’s resignation.

In April, Denison released its inaugural ESG Report regarding the Company’s environmental, social and governance initiatives and demonstrating its ongoing commitment to sustainability and transparency. Denison’s ESG Reports focus on key ESG topics including the Company’s objective to maintain excellence in corporate governance practices, “best in class” engagement with communities potentially impacted by its activities, diversity in the Company’s workforce, and robust assessments of the environment and biodiversity in the regions within which it operates.

And in April, in connection with the updated PDP and related decrease in the financial assurances required for the MLJV and MWJV reclamation obligation, the Company entered into a further amendment with respect to the Credit Facility pursuant to which the pledged amount of cash required under the Credit Facility was decreased and the additional cash collateral was released.

In May, at Denison’s Annual General Meeting of Shareholders (the “2024 AGM”), Mr. Bob Dengler did not stand for re-election to the Board.

2024 ANNUAL INFORMATION FORM    12


In June, Denison and Kineepik Métis Local #9 (“KML”) entered into a Participation and Funding Agreement (the “KML PFA”), which expresses Denison’s and KML’s mutual commitment to the co-development of an agreement supporting the advancement of the Phoenix ISR project. The KML PFA builds on an existing letter agreement between Denison and KML with respect to the support of KML’s contributions to, and participation in, the Federal and Provincial EA process. The parties also entered into an Exploration Agreement (the “KML Exploration Agreement”) in respect of Denison’s exploration and evaluation activities within KML’s Land and Occupancy Area. These agreements reflect Denison’s commitment to the principles set out in the Company’s Indigenous Peoples Policy (“IPP”) and advancing reconciliation through taking action.

In October, Denison announced that it entered into an exploration agreement (the “YNLRO Exploration Agreement”) with the Ya’thi Néné Lands and Resources Office (“YNLRO”), Hatchet Lake Denesułiné First Nation, Black Lake Denesułiné First Nation, Fond du Lac Denesułiné First Nation (collectively, the “Athabasca Nations”) and the Northern Hamlet of Stony Rapids, the Northern Settlement of Uranium City, the Northern Settlement of Wollaston Lake and the Northern Settlement of Camsell Portage (collectively, the “Athabasca Communities”) in respect of Denison’s exploration and evaluation activities within the traditional territory of the Athabasca Nations (the “Nuhenéné”). The YNLRO Exploration Agreement expresses the parties’ intention to build a long-term relationship between Denison and the YNLRO, Athabasca Nations, and Athabasca Communities. Denison wishes to conduct and advance its exploration activities in a sustainable manner that respects the Athabasca Nations’ Indigenous rights, advances reconciliation with Indigenous peoples, and provides economic opportunities and other benefits to the Athabasca Communities in an authentic, cooperative and respectful way.

And in December, Mr. David Bronkhorst retired from his position as Vice President Operations of Denison, remaining with the Company in a technical advisory role. Concurrently therewith, Mr. Himbeault became Vice President Operations & Regulatory Affairs.

2023…

Project Developments – Wheeler River

In August, Denison filed a technical report summarizing the results of (i) the feasibility study completed for ISR mining of the high-grade Phoenix uranium deposit (the “Phoenix FS”); and (ii) a cost update to the Pre-Feasibility Study (“PFS”) for the Wheeler River project completed in 2018 for conventional underground mining of the basement-hosted Gryphon uranium deposit (“Gryphon PFS Update”). The results of the respective studies illustrated that both deposits have the potential to be competitive with the lowest cost uranium mining operations in the world. See “Wheeler River” for more details.

And in August, reflective of the extensive efforts undertaken by and for the Company, the CNSC deemed complete the Company’s responses to approximately 250 EIS information requests from the Federal Indigenous Review Team (“FIRT”). In November 2023, a subsequent round of information requests was received from the CNSC, seeking additional details for responses not fully accepted by the FIRT.

In September, Denison announced the signing of a Shared Prosperity Agreement (“SPA”) with English River First Nation (“ERFN”) supporting the development and operation of the Wheeler River project. The SPA received support from a substantial majority of ERFN members who participated in a ratification vote on its key terms. The signing of the SPA follows years of active engagement, including a four-month-long ERFN-led community consultation process ahead of the ratification vote, and represents a significant milestone in the history of both Denison’s relationship with ERFN and the Wheeler River project.

In October, the SKMOE confirmed its satisfaction with Denison’s comment responses and proposed EIS updates. The confirmation indicates that Denison could finalize the EIS for the purpose of obtaining a Provincial EA approval, however this would delink the coordinated Provincial – Federal EA process, which was not expected to provide a meaningful schedule advantage for the Phoenix project. Denison plans to submit one version of the final EIS to both authorities once the FIRT information requests have been resolved.

2024 ANNUAL INFORMATION FORM    13


In November, the Company announced the successful completion of the recovered solution management phase of the ISR FFT. The solution recovered during the FFT was stored on site and this final phase of the FFT involved the treatment of the recovered solution via an on-site purpose-built treatment system. Following treatment, a uranium precipitate product and a treated effluent were produced. The mineralized precipitates were recovered from the process with over 99.99% efficiency. The treated effluent was tested to ensure compliance with permit conditions before being injected into a designated subsurface area.

Other Project Developments

In April, Denison announced the completion of an internal conceptual mining study examining the potential application of the ISR mining method at the Midwest project. The concept study was prepared by Denison in 2022 and formally issued to the MWJV in early 2023. Based on the positive results of the concept study, the MWJV approved the completion of additional ISR-related work for Midwest in 2023 and 2024.

And in April, Denison reported the discovery of high-grade sandstone-hosted uranium mineralization approximately 30 metres above the unconformity in drill hole MS 23-10A, which was completed as part of the 2023 winter exploration program at the Moon Lake South property. The intersection in MS 23-10A returned 2.46% U3O8 over 8.0 metres, including a sub-interval grading 3.71% U3O8 over 4.5 metres. This result represents the best drill hole completed on the Moon Lake South property to date.

In November, the Company announced the completion of an inaugural ISR field test program at THT on the Waterbury Lake property. The program included (i) the installation of an eight well ISR test pattern designed to collect an initial database of hydrogeological data, (ii) testing of a permeability enhancement technique, (iii) the completion of hydrogeologic test work, highlighted by the achievement of hydraulic conductivity values consistent with those from the Waterbury PEA, and (iv) the execution of an ion tracer test which established a 10 hour breakthrough time between the injection and extraction wells, while also demonstrating hydraulic control of the injected solution. Overall, the program successfully achieved each of its planned objectives.

Financing Developments

In October, Denison completed a bought deal equity financing resulting in the issuance of 37,000,000 shares at a price of $2.03 (US$1.49) per share for total gross proceeds of $75.1 million (US$55.1 million). The Company intends to use the net proceeds from the offering to fund (1) the advancement of the proposed Phoenix ISR uranium mining operation through the procurement of long lead items (including associated engineering, testing and design) identified during the ongoing Front End Engineering Design (“FEED”) process and the Phoenix FS; (2) exploration and evaluation expenditures; and (3) general corporate and administrative expenses, including those in support of corporate development activities, and working capital requirements.

And in October, the Company completed a $15 million strategic investment in F3 Uranium Corp. (“F3”) with the acquisition of unsecured convertible debentures (the “Debentures”), which carry a 9% coupon and will be convertible at Denison’s option into common shares of F3 at a conversion price of $0.56 per share. F3 has the right to pay up to one third of the quarterly interest payable by issuing common shares. F3 will also have certain redemption rights on or after the third anniversary of issuance of the Debentures and/or in the event of an F3 change of control.

In December, the Company amended and extended its Credit Facility to January 31, 2025.

In 2023, the Company sold 200,000 pounds U3O8 at an average selling price of $99.50 per pound U3O8 (US$73.38 per pound U3O8), representing a realized gain on sale of $12.6 million (US$8.8 million), based on Denison’s average acquisition cost of $36.67 per pound U3O8 (US$29.66 per pound U3O8). As at December 31, 2023, the Company’s remaining uranium portfolio had increased in value by 228% since acquisition, to $120.35 per pound U3O8 (US$91.00 per pound U3O8), for an aggregate value of approximately $276.8 million (US$209.3 million).

During 2023, the Company issued 19,786,160 shares under the 2021 ATM Program. The Shares were issued at an average price of $1.91 per share for aggregate gross proceeds of $37,877,000. The Company also recognized costs of $845,000 related to the maintenance of the 2021 ATM Program and Share issuances, which includes $757,000 of commissions, for net proceeds after commissions of $37,130,000.

2024 ANNUAL INFORMATION FORM    14


Corporate Developments

In February, Mr. Yun Chang Jeong resigned from the Board. Mr. Byeong Min An joined the Board in early March, filling the vacancy created by Mr. Jeong’s resignation.

In September, Ms. Elizabeth Sidle was appointed Interim Chief Financial Officer of the Company, in addition to her current role as Vice President Finance, in connection with the leave of absence and subsequent departure from the Company of Mr. McDonald, former Executive Vice President & Chief Financial Officer. Ms. Sidle was appointed Chief Financial Officer in December.

In December, Mr. Geoff Smith joined Denison in the position of Vice President Corporate Development & Commercial, focused on supporting Denison’s investor and customer engagement, the evaluation and execution of growth opportunities and financing arrangements, and the development and oversight of the Company’s uranium sales and contracting strategies.

2024…

Project Developments – Wheeler River

In January, Denison awarded a contract for approximately $16 million to Wood Canada Limited (“Wood”), for the completion of detailed design engineering for Phoenix. The contracted scope of the facilities to be designed by Wood is extensive. The work commenced in the first quarter of 2024 and is expected to be substantially completed in the third quarter of 2025. Throughout 2024, the Company continued to focus its efforts on the advancement of Phoenix towards a final investment decision (“FID”), in support of its objective to achieve first production by the first half of 2028, including the advancement of Phoenix detailed design engineering activities. Total engineering completion at end of 2024 was approximately 65%, supported by finalization of process design, piping and instrumentation diagrams, hazard and operability studies, as well as the selection of major process equipment and electrical distribution infrastructure.

In March, Denison signed a Sustainable Communities Investment Agreement (the “SCIA”) with the municipalities of the Northern Village of Beauval, the Northern Village of Île-à-la Crosse, the Northern Hamlet of Jans Bay, and the Northern Hamlet of Cole Bay (the “SCIA Communities”). The SCIA reflects a common goal of facilitating qualified businesses and workers in benefitting from opportunities associated with the development of the Wheeler River project. The SCIA establishes commitments for funding to support community development initiatives, focused on contributing to the current and future economic prosperity and sustainability of the Communities by promoting economic development and investments in capital projects, job creation and training, housing, education, and other initiatives. In consideration for such contributions to the Communities’ initiatives, the Communities have provided their consent and support for the Wheeler River project and have committed, amongst other things, to support all regulatory approvals issued for the Wheeler River project related to exploration, evaluation, development, operation, reclamation, and closure activities.

In early July, Denison announced the signing of a Mutual Benefits Agreement (“MBA”) with KML and a Community Benefit Agreement (“CBA”) with the northern Village of Pinehouse Lake (“Pinehouse”), in support of the development and operation of Wheeler River. The MBA acknowledges that Wheeler River is located within KML’s Land and Occupancy Area in northern Saskatchewan and provides KML’s consent and support to advance the project. Additionally, the MBA recognizes that the development and operation of Wheeler River can support KML in advancing its social and economic development aspirations, while mitigating the impacts on the local environment and KML members. The MBA provides KML and its Métis members an important role in environmental monitoring and commits to the sharing of benefits from the successful operation of Wheeler River – including benefits from community investment, business opportunities, employment and training opportunities, and financial compensation. The CBA acknowledges that Pinehouse is the closest residential community to Wheeler River by road, which relies on much of the same regional infrastructure that Denison will rely on as it advances the project. Pinehouse has provided its consent and support for Wheeler River, while Denison, on behalf of the Wheeler River Joint Venture (“WRJV”), is committed to help Pinehouse develop its own capacity to take advantage of economic and other development opportunities in connection with the advancement and operation of the project.

2024 ANNUAL INFORMATION FORM    15


Multiple key regulatory milestones were achieved in late 2024, including (i) completion of the technical review phase of the federal EA approval process in November, (ii) acceptance by the CNSC of the EIS in December, and (iii) the CNSC’s determination of the sufficiency of Denison’s application for a Licence to Prepare and Construct a Uranium Mine and Mill (“Licence to Construct”), in November. These accomplishments indicate that the CSNC staff support the advancement of the Phoenix project. Accordingly, the CNSC Registrar has set the schedule for the CNSC public hearing for Wheeler River. The hearing is scheduled to be held in two parts (October 8, 2025, and December 8 to 12, 2025) and represents the final step in the federal approval process for Wheeler River’s EA and Licence to Construct.

In October 2024, Denison submitted a final EIS to the SKMOE, in substantially the same form as the EIS that has been submitted to the CNSC. The province completed a public and Indigenous review period on the EIS in November and December 2024, of which the comments received will be considered in the issuance of a Ministerial Decision for the EA.

For further details, see “Wheeler River” and “Environmental, Health, Safety and Sustainability Matters” below.

In October 2024, the WRJV Management Committee approved the findings and recommendations of the Phoenix FS, which became an Approved Development Program (“ADP”) under the WRJV Agreement, providing the WRJV’s approval for development and construction of the project in accordance with the Phoenix FS. Denison has not yet made a FID with respect to the Phoenix project, pending project EA and License to Construct approval.

At the October 2024 meeting of the WRJV Management Committee, JCU abstained from voting on the ADP. In accordance with the terms of the WRJV Agreement, non-support of the ADP by a participant means that such participant is no longer liable for its cost share of WRJV expenditures. As a result of JCU’s non-support through abstention, Denison has funded, and expects to continue to fund, 100% of the project expenditures from October 2024. The WRJV Agreement further requires that a participant who does not support an ADP must sell or transfer their interest. UEX, as operator of JCU, has notified Denison that it does not agree that JCU’s abstention from the ADP vote should be taken as non-support for the ADP and the sale or transfer of JCU’s participating interest in the WRJV has not yet occurred. See “Legal and Regulatory Proceedings” for further information.

Other Project Developments

In January, Denison and Orano Canada announced that the MLJV has approved a restart of uranium mining operations using the joint venture’s patented SABRE mining method. Mining is planned to commence at the McClean North deposit in 2025. Activities in 2024 focused on preparations necessary to ready the existing SABRE mining site and equipment for continuous commercial operations, as well as the installation of pilot holes for the first mining cavities planned for excavation. See “Denison Operations-SABRE Mining Program” for further details.

And in January, Denison entered into an agreement (the “KLP Agreement”) with Grounded Lithium Corp. (“Grounded Lithium”) with respect to the Kindersley Lithium Project (“KLP”) in Saskatchewan. The KLP Agreement includes a series of earn-in options, with each earn-in option being comprised of a cash payment to Grounded Lithium as well as project expenditures to advance KLP. The investment in KLP was seen as an opportunity for Denison to leverage its technical expertise to potentially unlock greater value for the project. Should Denison complete all three earn-in options, it will have made cumulative cash payments to Grounded Lithium of $3.2 million and have funded $12 million in project expenditures to earn a 75% working interest in the KLP. Upon funding the total amounts of each earn-in option phase, Denison has the right to either exercise the earn-in option and acquire the working interest associated with that phase or move on to the ensuing option phase. The KLP Agreement terminates on the earliest of: (i) Denison electing to acquire its working interest and convert to a formal joint venture or to terminate, (ii) June 30, 2028, or (iii) a date as otherwise agreed between the parties.

In February, the Company announced its acquisition of fixed and mobile MaxPERF Tool Systems from Penetrators Canada Inc. (“Penetrators”). The MaxPERF Tool Systems have been successfully deployed several times as a method of permeability enhancement in ISR field studies conducted on the Company’s potential ISR mining projects, including at the Phoenix deposit. Penetrators has also agreed to work exclusively with Denison for a 10-year period with respect to the use of the MaxPERF Tool Systems for uranium mining applications, and related services, in Saskatchewan.

2024 ANNUAL INFORMATION FORM    16


In June, Denison and Orano Canada announced the completion of an ISR field test program at Midwest. The program involved drilling ten small diameter boreholes within the Midwest Main deposit, primarily undertaken to evaluate site-specific conditions for ISR mining. A series of tests were successfully performed on each borehole, creating an extensive database of geological, hydrogeological, geotechnical, and metallurgical data and validating certain key assumptions in the previously completed concept study evaluating the potential use of ISR mining at Midwest. For further details see “Mineral Properties – Other Athabasca and Exploration Properties - Midwest 2024 Activities”.

In September, Denison executed an option agreement with Foremost Clean Energy Ltd (“Foremost”), which grants Foremost a multi-phase option to acquire up to 70% of Denison’s interest in 10 non-core uranium exploration properties (the “Foremost Transaction”). Pursuant to the Foremost Transaction, Foremost would acquire such total interests upon completion of a combination of direct payments to Denison and funding of exploration expenditures with an aggregate value of up to approximately $30 million. In October 2024, Foremost completed the conditions for the first tranche of the option, pursuant to which Denison received an upfront payment in Foremost common shares, and in November 2024, Denison participated in a Foremost equity offering. At December 31, 2024, Denison owned ~19.13% of the outstanding common shares of Foremost. If Foremost completes the remaining two phases of the Foremost Transaction, Denison will receive further cash and/or common share milestone payments of $4.5 million and Foremost will fund $20 million in project exploration expenditures.

In November, Denison executed an acquisition agreement with Cosa Resources Corp. (“Cosa”) pursuant to which Cosa agreed to acquire a 70% interest in three of Denison’s portfolio uranium exploration properties in exchange for approximately 14.2 million Cosa common shares, $2.25 million in deferred equity consideration, and a commitment to spend $6.5 million in exploration expenditures on the properties (the “Cosa Transaction”).

Financing Developments

In April, Denison completed the sale of 100,000 pounds of U3O8 from its physical uranium holdings, at a price of $135.98 (US$100.00) per pound. Denison acquired its physical uranium position in 2021 at an average cost of US$29.65 per pound U3O8.

In December, the Company completed a private placement of 3,000,000 Shares that qualify as “flow-through shares” for purposes of the Income Tax Act (Canada) at a price of $4.70 per share for gross proceeds of approximately $14,100,000, the proceeds of which are to be used on the Company’s exploration activities in 2025. The income tax benefits of this issue were renounced to subscribers with an effective date of December 31, 2024.

Corporate Developments

In March, Mr. Byeong Min An resigned from the Board. Mr. Jong Ho Hong joined the Board in March, filling the vacancy created by Mr. An’s resignation.

In May, in connection with the 2024 AGM, changes were made to the composition of the Company’s Board of Directors, with Mr. Ron Hochstein not standing for re-election at the meeting, and Ms. Jennifer Traub, a partner in the Securities Group, and Co-Chair of the Mining Group, at Cassels Brock & Blackwell LLP, was appointed Chair of the Board.

2025 Recent Developments…

In January, the Company closed the Cosa Transaction, and Denison and Cosa formed three uranium exploration joint ventures. In February, the Company participated in a Cosa equity offering, and upon completion Denison owned 19.95% of Cosa shares on a partially-diluted basis.

In February, the CNSC Registrar set the schedule for the CNSC Hearing for Wheeler River. The Hearing is scheduled to be held in two parts (October 8, 2025, and December 8 to 12, 2025) and represents the final step in the federal approval process for the Project’s EA and Licence to Prepare and Construct a Uranium Mine and Mill.

In March, there were a number of Board changes, with the appointment of Mr. Ken Hartwick, former President & CEO of Ontario Power Generation, the retirement of Mr. Brian Edgar, after 20 years of service to the Company, the resignation of Mr. Jong Ho Hong, and the appointment of Mr. Jinsu Baik to fill the vacancy created by Mr. Hong’s resignation.

2024 ANNUAL INFORMATION FORM    17


The Uranium Industry 2024

In 2024, the long-term price of U3O8 steadily increased, finishing the year up approximately 16% from the end of 2023, which represents a 15-year high. This comes after a significant increase during 2023 of 33% from US$51 per pound U3O8 at the end of 2022 to US$68 per pound U3O8 at the end of 2023. The Company believes the strengthening long-term price over the course of 2024 is representative of strong underlying market fundamentals for uranium. In January 2024, the spot price for uranium surpassed US$100 per pound U3O8 for the first time since 2008. For the balance of 2024, the spot price converged with the long-term price at around US$80 per pound U3O8 before falling slightly below the long-term price near the end of the year and finishing the year down 20%. The spot price reflects sporadic discretionary buying and selling activity and, as a result, continues to experience greater price volatility than the long-term price, which reflects pricing that typically comes from producer to consumer contracting in the form of multi-year supply contracts. Generally, a significant majority of uranium sales occur via long-term supply agreements, with comparatively smaller annual volumes clearing through the spot market.

The Company believes the current uranium market environment demonstrates notable similarities to the last time prices reached these levels. In the early 2000s, highly enriched uranium (HEU) and other former Soviet Union supplies remained a market hangover from the Cold War with elevated inventory levels weighing on prices for years with limited new supply coming online. Ultimately, this period of low prices, then compounded with adverse supply shocks, created a favourable environment for uranium prices in future years when paired with significant expected demand growth driven by ambitious plans for nuclear power in China.

Meaningful new sources of supply were scarce, due to years of under investment, at a time of rapid demand growth. The Japanese tsunami and associated Fukushima nuclear incident in 2011 disrupted the market and set in motion a similar period of low prices and excess inventories. Given the sudden shut-down of the Japanese nuclear fleet and other reductions in demand, excess uranium inventories and excess enrichment capacity, which provided the ability to create additional uranium supply, catalyzed a downward shock to price. During this extended period, prices were below the cost of production for many producers, leading to the shutdown of multiple mines and a sharp reduction in investment in new exploration and development activities across the sector.

After years of supply discipline, and the accumulation of physical uranium positions amongst financial investors, the market reached an inflection point followed by five consecutive years of long-term price increases between 2020 and 2024, reflective of a market transitioning to be driven by the cost of future production rather than by the availability of surplus inventories. Looking ahead, the Company believes that increasing demand for nuclear energy, coupled with a prolonged period of limited investment in new supply, creates supply-demand dynamics that are supportive of strong uranium prices for the foreseeable future.

During 2024, investor interest in the uranium and nuclear energy sectors accelerated. This is believed to largely be driven by a continued focus on global goals to achieve net-zero carbon emissions, and the growing recognition of the necessary role for nuclear energy in the “clean energy transition”. In assessing the potential paths to reduce carbon emissions many nations, policymakers, interest groups, and businesses have recognized the critical role that existing or planned future nuclear power plants could play in achieving decarbonization objectives. The Company believes these positive nuclear demand fundamentals support expectations for robust uranium markets. There is also increasing support from large technology companies that have announced partnerships with nuclear utilities indicating a desire for reliable and emission-free electricity to meet expected growth in artificial intelligence and data centres’ electricity needs. This includes a 2024 commitment announced by Microsoft to support the restart of one of the Three Mile Island nuclear reactors and Amazon’s agreement to support small modular nuclear reactor projects with Dominion Energy.

2024 ANNUAL INFORMATION FORM    18


Uranium Demand

There is global focus on the importance of nuclear power in enabling the achievement of carbon emission goals and responding to growing energy demands. This recognition was further enshrined as over 20 nations pledged to triple nuclear energy generation capacity by 2050 at COP28 in Dubai in December 2023. This support continued to grow with now over 30 nations pledging such support as of COP29 in Baku in November 2024. The Company believes this wide-spread government support for nuclear energy represents a paradigm shift. In addition to the renewed commitment to nuclear from powerhouse nations like Japan, Korea, France, and the United States in recent years, positive nuclear demand developments occurred in many nations in 2024. Three notable nuclear reactor projects that had been in construction for a decade reached commercial operations in 2024 including Vogtle 4 in the United States, Shin Hanul 2 in South Korea, and Barakah 4 in the United Arab Emirates. China continues to be a major source of growth for nuclear energy, with UxC LLC (“UxC”) reporting that China currently has 31 reactors under construction, and 12 new build projects in the licensing process.

In Canada, Ontario Power Generation (“OPG”) announced refurbishment plans for its Darlington nuclear plant, and Bruce Power continued its ongoing refurbishment efforts. OPG also announced reactor life extension projects at the Pickering B station and has begun planning a new nuclear plant, which could accommodate up to 10,000 megawatts of new generation capacity. Additionally, small modular reactors (“SMRs”) are being advanced in both Ontario and Saskatchewan, with OPG targeting completion of its first SMR project before 2030. In Japan, two boiling water reactors (“BWR”) reactors were restarted in 2024, becoming the first BWRs to restart since the 2011 Fukushima accident.

Taken together, forecasts from UxC for global reactor units and nuclear capacity in 2035 is 552 units and 514 gigawatts electrical (“GWe”) installed capacity (estimated as of Q4’2024) – representing a 30% increase in global nuclear power generation from 439 units producing 396 GWe as of December 2024. UxC forecasts nuclear generation capacity growth to translate into similar increases in demand for uranium and forecasts 2035 base case uranium demand of 253 million pounds U3O8, an estimated 32% increase from expected 2024 demand of 192 million pounds U3O8.

Primary Uranium Supply

On the supply side, uranium production for 2024 is estimated at 153 million pounds U3O8, which represents a 7% increase over 2023 production levels, largely due to the ramp-up of the McArthur River mine in Canada and Budenovskoye 6 and 7 in Kazakhstan. Taken together with UxC estimates of total demand for 2024, there is a significant primary supply shortfall estimated to be approximately 20% of total demand or 39 million pounds U3O8.

In Q4’2024, UxC estimated 2025 primary production to increase to 170 million pounds U3O8, with the production increase being supported by increasing production from Kazatomprom in Kazakhstan and the ramp-up of a series of mines in the United States and Africa. Additionally, UxC estimates secondary supplies for 2025 are projected at 25 million pounds of U3O8 equivalent (“U3O8e”), which is a significant reduction from 38 million pounds U3O8e of secondary supplies estimated in 2024, 61 million pounds U3O8e in 2023, and 69 million pounds U3O8e in 2022. Strong demand in past years has accelerated the process of drawing down these secondary sources of supply. With this rapid decline in secondary supplies, the market is expected to continue its shift from an inventory-driven market to a production-driven market in the coming years.

Nuclear sentiment also continues to be supported by an increased focus on energy security in the aftermath of Russia’s invasion of Ukraine. Additionally, the importance of security of supply was further magnified in July of 2023, as a military coup was waged in Niger, which led to the withdrawal of foreign embassy personnel, and an expropriation of Orano’s uranium mining operations in June 2024. In 2022, Niger ranked as the seventh largest uranium-producing country. The Russian invasion of Ukraine in February 2022 continues to cause significant turmoil in the global nuclear fuel market. Russia is a significant supplier of enriched uranium to the rest of the world, operating over 40% of the world’s uranium enrichment capacity prior to the Ukraine invasion. In 2021, Russian enrichment comprised 31% of European Union enrichment purchases and 28% of US utility enrichment purchases. While deliveries of material from Russia to Western utilities continue, increased demand for non-Russian supply has led to significantly increased prices for uranium processing services.

2024 ANNUAL INFORMATION FORM    19


From December 2021 to December 2024, the long-term price of conversion and enrichment services increased by 178% and 172%, respectively. In the short- to medium-term, in order to increase enriched uranium production in the supply-constrained Western enrichment market, Western enrichers are expected to input more UF6 (overfeed) into their centrifuges in order to maximize production capacity. As a consequence, Western utilities, in aggregate, would require more natural uranium feedstock to produce the same quantity of enriched uranium (i.e., enrichment contracts contain higher tails assay levels).

In 2023, US and European utilities demonstrated a path towards reduced reliance on Russian nuclear fuel supply and increasingly favouring Western supply chains. In December 2023, a US bill to curb imports of Russian uranium was approved by US Congress. In May 2024, the U.S. President signed law H.R. 1042, the Prohibiting Russia Uranium Imports Act, which prohibits the importation into the U.S. of low enriched uranium produced in the Russian Federations or by a Russian entity. This law includes a waiver provision to allow for imports if the U.S. Secretary of Energy determines no alternative source can be procured or if shipments are deemed in the national interest. This law reinforces the ongoing shift of Western uranium supply chains away from Russia, which increasingly favours North American uranium supply.

Russia is also a major player in uranium logistics, with significant quantities of uranium from Central Asia typically transported through Russia to Russian ports for delivery to Western uranium conversion facilities. UxC estimates Kazakhstan and Uzbekistan combined for 45% of global primary uranium production in 2024. As a result, logistics of uranium shipped through Russia remains an item of concern to uranium end users. Some uranium has been successfully shipped from Kazakhstan to Canada via the Trans-Caspian International Transport Route, which does not include transit through Russia; however, reports indicate that this route is subject to operational limitations.

Outlook

Overall, nuclear demand growth appears poised for acceleration led by a shifting energy mix towards decarbonized energy at a time when limited investment in bringing new uranium mine supply online has occurred over the past decade. While some idled or curtailed production from existing uranium mining operations has returned to the market, it is expected that (i) production costs associated with further potential restart projects will be higher than previous levels due to inflation and other restart challenges, and (ii) much of the potential new or greenfield mine supply required to meet demand estimates remains several years away.

The accelerated decline in secondary sources of uranium supply in recent years, the depletion of existing mines, the increase in tails assay at Western enrichment plants, and growing future reactor demand, point to larger supply deficits during the second half of this decade that may prove difficult to balance without considerable and rapid investment in new large-scale uranium mining projects. Uncovered utility uranium requirements for the period from 2024 to 2040, not including typical inventory building or restriction on existing supply agreements with Russia, are estimated at 2.1 billion pounds U3O8. It is therefore evident that the necessary new future sources of supply required by the market have not yet been secured by utilities, and that the response from incumbent suppliers to sign significant long-term supply contracts in recent years have not satisfied the needs of utility customers. Together, there is indication of a good reason to expect a further phase of utility procurement directed at incentivizing new projects to meet long-term demand needs.

2024 ANNUAL INFORMATION FORM    20


Competition

The uranium industry is small compared to other commodity or energy industries. Uranium demand is international in scope, but supply is characterized by a relatively small number of companies operating in only a few countries. Primary uranium production is concentrated amongst a limited number of producers and is also geographically concentrated, with 82% of the world’s production in 2024 projected to come from only four countries: Kazakhstan, Canada, Namibia, and Australia. Producers compete for market share and commercial terms necessary to support project economics. This is complicated by the influence of state-owned enterprises that operate within the uranium mining industry, often producing uranium supply as part of a vertical integration strategy that may be less sensitive to uranium pricing than those operating uranium mines as a primary business.

Competition is somewhat different amongst exploration & development companies focused on the discovery or development of a uranium deposit. Exploration for uranium is being carried out on various continents, but in recent years development activities by public companies have been generally concentrated in Canada, Africa, Australia, and the United States. In Canada, exploration has focused on the Athabasca Basin region in northern Saskatchewan. Explorers have been drawn to this area by the high-grade uranium deposits that have produced some of the most successful uranium mining operations in recent history. Within the Athabasca Basin region, exploration is generally divided between activity that is occurring in the eastern portion of the Basin and the western portion of the Basin. The eastern portion of the Basin is a district that is defined by rich infrastructure associated with existing uranium mines and uranium processing facilities. Infrastructure includes access to the provincial power grid and a network of all-weather provincial highways. By comparison, there are no uranium mines or processing facilities in the western portion of the Basin, and access to the provincial power grid is not currently available. Several uranium discoveries have been made in the Athabasca Basin region in recent years, and competition for capital, high-quality properties, and professional staff can be intense.

2024 ANNUAL INFORMATION FORM    21


Mineral Reserves and Mineral Resources

NI 43-101 requires mining companies to disclose mineral reserve and resource estimates using the subcategories of proven mineral reserves, probable mineral reserves, measured mineral resources, indicated mineral resources and inferred mineral resources.

Chad Sorba, P.Geo, Denison’s Vice President Technical Services and Project Evaluation, is a “Qualified Person” in accordance with the requirements of NI 43-101, and has reviewed and approved all disclosure of scientific or technical information in this AIF.

Denison Mineral Reserves and Mineral Resources

The following tables show the Company’s current estimates of mineral reserves and mineral resources as at December 31, 2024. For more information about the Company’s properties, see “Wheeler River” and “Other Exploration & Evaluation Projects”.

Proven Mineral Reserve Estimates (1,13)

Company 

100% Basis

Share(9)

    

    

    

Pounds of 

    

Pounds of

Grade 

U3O8 

U3O8 

Project/Deposit

Tonnes

% U3O8

(,000)

(,000)

McClean - Ore Stockpile

 

90,000

 

0.37

 

700

 

200

Wheeler River - Phoenix(2)

 

6,300

 

24.5

 

3,400

 

3,200

Total Proven Mineral Reserves

 

96,300

 

 

4,100

 

3,400

Probable Mineral Reserve Estimates (1,2,3,4,13)

Company 

100% Basis

Share(9)

    

    

    

Pounds of

    

Pounds of

Grade 

U3O8 

U3O8

Project/Deposit

Tonnes

% U3O8

(,000)

(,000)

Wheeler River - Phoenix

 

212,700

 

11.4

 

53,300

 

50,600

Wheeler River - Gryphon

 

1,257,000

 

1.8

 

49,700

 

47,200

Total Probable Mineral Reserves

 

1,469,700

 

 

103,000

 

97,800

Measured Mineral Resource Estimates (1,5,7,13)

    

    

    

    

    

Company 

100% Basis

Share(9)

Pounds of

Pounds of

Grade

U3O8

U3O8

Project/Deposit

Tonnes

% U3O8

(,000)

(,000)

Wheeler River - Phoenix

 

64,200

 

21.8

 

30,900

 

29,400

Total Measured Mineral Resources

 

64,200

 

 

30,900

 

29,400

2024 ANNUAL INFORMATION FORM    22


Indicated Mineral Resource Estimates (1,5,7,13)

    

    

    

    

Company

100% Basis

Share(9)

Pounds of 

Pounds of 

Grade

U3O8 

U3O8

Project/Deposit

Tonnes

 % U3O8

(,000)

(,000)

Wheeler River - Phoenix(7)

 

216,000

 

8.3

 

39,700

 

37,700

Wheeler River - Gryphon(7)

 

1,643,000

 

1.7

 

61,900

 

58,800

Wheeler River Subtotal

 

1,859,000

 

 

101,600

 

96,500

McClean – Sue F (formerly Caribou)

 

47,800

 

2.6

 

2,800

 

600

McClean - Sue D

 

122,800

 

1.1

 

2,800

 

600

McClean - McClean North

 

204,300

 

2.8

 

12,200

 

2,700

McClean Subtotal

 

374,900

 

 

17,800

 

3,900

Midwest - Midwest Main

 

453,000

 

4.0

 

39,900

 

10,100

Midwest - Midwest A

 

566,000

 

0.87

 

10,800

 

2,700

Midwest Subtotal

 

1,019,000

 

 

50,700

 

12,800

Waterbury - THT (formerly J Zone)

 

291,000

 

2.0

 

12,800

 

9,000

Total Indicated Mineral Resources

 

3,543,900

 

 

182,900

 

122,200

Inferred Mineral Resource Estimates (1,6,13)

    

    

    

    

Company 

100% Basis

Share(9)

Pounds of

Pounds of

Grade

U3O8

U3O8

Project/Deposit

Tonnes

% U3O8

(,000)

(,000)

Wheeler River - Phoenix

 

5,600

 

2.6

 

300

 

300

Wheeler River - Gryphon

 

73,000

 

1.2

 

1,900

 

1,800

Wheeler River Subtotal

 

78,600

 

 

2,200

 

2,100

McClean - Sue D

 

24,200

 

0.39

 

200

 

McClean - Sue E(8)

 

483,400

 

0.69

 

7,300

 

1,600

McClean - McClean North

 

3,300

 

0.79

 

100

 

McClean Subtotal

 

510,900

 

 

7,600

 

1,600

Midwest - Midwest Main

 

793,000

 

0.66

 

11,500

 

2,900

Midwest - Midwest A

 

53,000

 

5.8

 

6,700

 

1,700

Midwest Subtotal

 

846,000

 

 

18,200

 

4,600

Waterbury - Huskie

 

268,000

 

0.96

 

5,700

 

4,000

Waterbury Subtotal

 

268,000

 

 

5,700

 

4,000

Christie Lake

 

588,000

 

1.57

 

20,400

 

3,500

Christie Lake Subtotal

 

588,000

 

 

20,400

 

3,500

Total Inferred Mineral Resources

 

2,291,500

 

 

54,100

 

15,800

Historical Estimates

A qualified person has not done sufficient work to verify and classify these historical estimates as current mineral resources for the Company or confirm their reporting of resources is in accordance with NI 43-101 categories, though the Company has no reason to believe the information is not relevant or reliable. The Company is not treating this information as current mineral resources. As these do not represent material properties for the Company at this time, the Company does not currently have any plans to conduct work to verify the historical estimates.

2024 ANNUAL INFORMATION FORM    23


JCU Estimates

Historical Indicated Mineral Resource Estimates (13)

    

    

    

    

Company

100% Basis

 Share(10)

Pounds of 

Pounds of

Grade

U3O8

U3O8 

Project/Deposit

Tonnes

 % U3O8

 (,000)

(,000)

Millennium(11)

 

1,442,600

 

2.39

 

75,900

 

11,400

Kiggavik(12)

 

10,418,000

 

0.55

 

127,300

 

21,500

Total Indicated Mineral Resources

 

11,860,600

 

  

 

203,200

 

32,900

Historical Inferred Mineral Resource Estimates (13)

    

    

    

    

Company 

100% Basis

Share(10)

Pounds of 

Pounds of

Grade 

U3O

U3O

Project/Deposit

Tonnes

% U3O8

(,000)

(,000)

Millennium(11)

 

412,400

 

3.19

 

29,000

 

4,400

Kiggavik(12)

 

733,000

 

0.33

 

5,400

 

900

Total Inferred Mineral Resources

 

1,145,400

 

  

 

34,400

 

5,300

McClean South

McClean South Historical Estimates (14)

Company’s

100% Basis

Share

Pounds of

Pounds of

    

Grade

    

U3O8

    

U3O8

Deposit

Tons

    

(% U3O8)

(,000)

(,000)

Southwest Pod

 

47,600

 

2.10

 

2,000

 

500

Southeast Pod

 

126,700

 

0.73

 

1,900

 

400

Notes to Mineral Resource and Mineral Reserve & Historical Estimates Tables:

(1)CIM definitions were followed for classification of mineral reserves and mineral resources. Mineral resources are not mineral reserves and do not have demonstrated economic viability. Mineral resources, mineral reserves, and relevant assumptions, parameters and methods used for estimating, are documented in the following technical reports filed under the Company’s profile on SEDAR+ and EDGAR:
a.Wheeler River: The Wheeler Report (see “Wheeler River” below for further details)
b.McClean: (A) the “Technical Report on the Denison Mines Inc. Uranium Properties, Saskatchewan, Canada” dated November 21, 2005, as revised February 16, 2006 (the “McClean Technical Report”), (B) the “Technical Report on the Sue D Uranium Deposit Mineral Resource Estimate, Saskatchewan, Canada” dated March 31, 2006 (the “Sue D Report”), and (C) the “Technical Report on the Mineral Resource Estimate for the McClean North Uranium Deposits, Saskatchewan” dated January 31, 2007 (the “McClean North Technical Report”)
c.Midwest: “Technical Report with an Updated Mineral Resource Estimate for the Midwest Property, Northern Saskatchewan, Canada” dated March 26, 2018
d.Waterbury: “Preliminary Economic Assessment for the Tthe Heldeth Túé (J Zone) Deposit, Waterbury Lake Property, Northern Saskatchewan, Canada” effective October 30, 2020
e.Christie Lake: “Technical Report for the Christie Lake Uranium Project, Saskatchewan, Canada” with an effective date of December 31, 2021 and filed on March 27, 2023.

2024 ANNUAL INFORMATION FORM    24


The summary information on Denison’s proven mineral reserve estimate for McClean was prepared from the year-end stockpile survey reported by Orano Canada, the MLJV operator.

(2)Mineral reserves are estimated at a cut-off grade of 0.5% U3O8 based on the ISR mining method, using a long-term uranium price of US$50/lb U3O8 and a CA$/US$ exchange rate of 1.33. The mineral reserves are based on a mine operating cost of $0.78/lb U3O8, process operating cost of $5.20/lb U3O8, and process recovery of 99%. The effective date of the mineral reserve estimate is June 23, 2023. A mine recovery rate of 80.6% has been applied to convert the mineral resources to mineral reserves. Recoverable U3O8 refers to ISR recoverable and does not account for process losses.
(3)The effective date of the mineral reserves is September 1, 2018. Mineral reserves for the Gryphon deposit are estimated at a cut-off grade of 0.58% U3O8 based on longhole mining using a long-term uranium price of US$50/lb and a US$/CA$ exchange rate of 0.8. The mineral reserves are based on a mine operating cost of $150/t, mill operating cost of $275/t, G&A cost of $99/t, transportation cost of $50/t, milling recovery of 97%, and 7.25% fee for Saskatchewan royalties. Mineral reserves include for diluting material and mining losses.
(4)Mineral reserves are stated at a processing plant feed reference point and include diluting material and mining losses.
(5)The measured and indicated mineral resources were estimated at various cut-off grades. They are:

Phoenix:

0.10% U3O8

McClean North:

0.10% U3O8

Gryphon:

0.20% U3O8

Midwest Main:

0.10% U3O8 (0.085% U)

Sue F:

0.10% U3O8

Midwest A:

0.10% U3O8 (0.085% U)

Sue D:

0.10% U3O8

THT (J Zone):

0.10% U3O8

(6)The inferred mineral resources were estimated at various cut-off grades. They are:

Phoenix:

0.10% U3O8

McClean North:

0.10% U3O8

Gryphon:

0.20% U3O8

Midwest Main:

0.10% U3O8 (0.085% U)

Sue D:

0.10% U3O8

Midwest A:

0.10% U3O8 (0.085% U)

Sue E:

0.10% U3O8

Huskie:

0.10% U3O8

Christie:

0.20% U3O8

2024 ANNUAL INFORMATION FORM    25


(7)Measured and indicated mineral resources for Phoenix and indicated mineral resources for Gryphon are inclusive of mineral reserves.
(8)The operator conducted confirmatory drilling on a portion of the Sue E mineral resources outside the designated pit and late in 2006 submitted a preliminary analysis detailing an inferred mineral resource of approximately 2 million pounds on a 100% basis in this area, as compared to the 7.3 million pounds estimated in the February 2006 technical report. The mineral resource has not been re-estimated using the new drill information.
(9)As at December 31, 2024, pursuant to the terms of the agreements with its applicable joint venture partners, the Company had an effective 95.00% interest in Wheeler River, a 22.50% interest in McClean Lake; a 25.17% interest in Midwest; and a 70.32% interest in Waterbury Lake.
(10)Denison’s share has been calculated as 50% of the product of JCU’s percentage interest in the applicable project multiplied by the estimated mineral resources on a 100% basis.
(11)Millennium mineral resources as reported by Cameco Corporation as of December 31, 2024 on their website at https://www.cameco.com/businesses/uranium-projects/millennium/reserves-resources. Cut-off grades and other assumptions, parameters and methods used to estimate resources are unknown.
(12)Kiggavik mineral resources as reported by Orano in their 2023 Activities Report available on their website at https://cdn.orano.group/orano/docs/default-source/orano-doc/finance/publications-financieres-et-reglementees/2023/orano_annual-activity-report_2023_online.pdf and converted (for grades, from %U to %U3O8; and for pounds, from tonnes U to pounds U3O8). Cut-off grades and other assumptions, parameters and methods used to estimate resources are unknown.
(13)Numbers may not add due to rounding.
(14)The historical estimates do not comply with the requirement of NI 43-101. CIM definitions are not used.

2024 ANNUAL INFORMATION FORM    26


Mineral Properties – Athabasca Basin

Denison’s mineral property interests are primarily located in the Athabasca Basin region of northern Saskatchewan, the majority of which are located in the eastern portion of the Athabasca Basin, which is host to considerable existing infrastructure including uranium mines and mills, and provincial powerlines and highways (see location map, below). As at December 31, 2024, Denison has direct interests in 35 mineral properties in the Athabasca Basin, comprised of 227 claims covering approximately 385,000 hectares. Denison holds additional indirect interests in various uranium project joint ventures in Canada through its 50% ownership interest in JCU. Denison also holds an earn-in option to acquire an interest in the KLP from Grounded Lithium.

Location Map of Denison’s Athabasca Basin Mineral Properties

Graphic

Athabasca Basin Overview

The Athabasca Basin covers an area of approximately 100,000 square kilometres in northern Saskatchewan and northeastern Alberta. The Athabasca Basin is one of the principal uranium-producing districts in the world and is host to the world’s highest-grade and some of the world’s largest uranium mines and deposits, including the McArthur River mine and Cigar Lake mine located in the eastern Athabasca Basin.

The uranium deposits are classified as unconformity-associated (also unconformity-related and –type) deposits owing to their spatial association with a major unconformable contact between a relatively undeformed Proterozoic sedimentary basin (the Athabasca Basin) and underlying metamorphosed and deformed Archean to Palaeoproerozoic basement rocks.

A broad variety of unconformity-associated deposit shapes, sizes, and compositions have been discovered. Two distinct varieties have been classified; 1) ‘egress-style’ polymetallic lenses at and above the unconformity, with variable and often highly elevated base metal and rare earth elements (“REE”) contents, and 2) ‘ingress-style’ vein sets within basement rocks, with typically lower base metal and REE contents.

2024 ANNUAL INFORMATION FORM    27


Egress-style deposits can occur in the sandstone, directly above the unconformity (e.g., Cigar Lake, Sue A and B), straddling the unconformity (e.g., Phoenix, Collins Bay B Zone, Midwest Main, Midwest A, McClean North, Key Lake) or perched high above the unconformity (certain zones at McClean Lake, Midwest, Cigar Lake). Ingress-style deposits are located in the basement rocks (e.g., Gryphon, Huskie, Eagle Point, Sue C, Sue E, Millennium, Arrow, Triple R); however, the Millennium deposit and, to an extent, the Gryphon deposit also contain subordinate mineralization at and above the unconformity. The Shea Creek deposits contain mineralization in the basement, deep in the basement, at the unconformity, and perched in the sandstone. In some deposits, there is a plunge to the mineralized pods from sandstone-hosted to basement-hosted within deposit–scale strike lengths (e.g., the Rabbit Lake-Collins Bay-Eagle Point trend, Sue trend deposits, McClean North).

The Athabasca unconformity-associated deposits are typically related to graphite-bearing structural zones within the metamorphosed and deformed Archean to Palaeoproerozoic basement rocks, which are often termed ‘corridors’ or ‘trends’. Alteration ‘halos’ or ‘envelopes’ tend to surround the mineralization, most notably in the overlying sandstone, and provide an enlarged exploration target through the detection of diagnostic alteration clays and geochemical pathfinder elements. Empirical exploration for the deposits typically involves mapping of structural corridors/trends by geophysical methods (dominantly electromagnetics, resistivity, or magnetics), followed by drill testing, given the buried or blind nature of the deposits below glacial cover or Athabasca sandstone, respectively. Drill core is subject to a variety of sampling and analytical methods to determine possible vectors toward mineralization, and downhole surveying is commonplace to test for elevated radioactivity or reconcile geophysical responses. The significant number of Athabasca uranium discoveries to date has also led to the development of numerous exploration models which are commonly used to facilitate interpretations and prioritize target areas.

Historical uranium production in the Athabasca Basin region used conventional open pit mining methods, such as the operations at Rabbit Lake, Cluff Lake, Key Lake and McClean Lake. Later in the mine life of Cluff Lake and Rabbit Lake, there was a transition to underground mining of other deposits on those properties.

The discovery of high-grade deposits such as Midwest, McArthur River and Cigar Lake in the 1980s did not immediately lead to production. The combination of challenging ground conditions (most notably the friable and water-saturated Athabasca sandstone conditions above the mineralization), depth, and the high-grade nature of the deposits required extensive research and development to design safe extraction methods before production was possible. Production from McArthur was achieved in the early 2000s, while Cigar Lake only initiated production in 2014. Production from these mines was only made possible by their unique combination of high grades (average grades > 10% U3O8) and large scale (>300 million lbs U3O8), as well as the development of innovative mining techniques, including ground freezing combined with either raise-bore mining or the use of the jet-boring mining system (“JBS”). The Midwest deposits are smaller in size than McArthur River and Cigar Lake, and remain undeveloped.

2024 ANNUAL INFORMATION FORM    28


In terms of mineral processing, each historical mining operation included a dedicated processing plant: Cluff Lake, Key Lake, Rabbit Lake and McClean Lake operations included on-site processing plants. Due to the rising cost of construction for such facilities and the availability of highways and other infrastructure in Saskatchewan’s North, processing of ores has transitioned to toll milling at existing facilities. McArthur River ore production is toll milled at the Key Lake mill, while Cigar Lake production is toll milled at the McClean Lake mill. With the suspension of operations at Rabbit Lake in 2016 and McArthur River in 2018, in part due to a prolonged slump in the global uranium market, only the Cigar Lake mine and the McClean Lake mill continued to operate and produce yellowcake in Saskatchewan during 2021.

In response to the COVID-19 pandemic, the Cigar Lake Joint Venture, operated by Cameco Corporation (“Cameco”), temporarily suspended production at the Cigar Lake mine from the end of March 2020 until September 2020, and then again from the end of December 2020 until April 2021. Coordinated therewith, the MLJV suspended operations at the McClean Mill for the duration of the suspended production.

In February 2022, Cameco announced its intention to restart uranium production at its McArthur River uranium mine and Key Lake uranium mill in 2022 — while at the same time outlining its intention to, together with Orano, continue to limit overall production at McArthur River and Cigar Lake well below full production rates. In February 2023, Cameco announced that due to improved uranium market conditions, Cigar Lake will instead target operating at its licensed capacity of 18 million pounds U3O8 and the plan will be for McArthur River to increase production to 18 million pounds U3O8 per year starting in 2024. Cameco announced that in 2024 it produced 16.9 million pounds U3O8 at Cigar Lake (due to a lower production rate at the McClean Lake Mill) and 20.3 million pounds U3O8 at McArthur River and Key Lake (setting a production record).

In January 2024, Denison and Orano Canada announced that the MLJV has approved a restart of uranium mining operations using the joint venture’s patented SABRE mining method. Mining is planned to commence at the McClean North deposit in 2025. See “Denison’s Operations-SABRE Mining Program” for further details.

2024 ANNUAL INFORMATION FORM    29


Wheeler River

Wheeler River, Denison’s material project, is the largest undeveloped uranium project in the infrastructure-rich eastern portion of the Athabasca Basin region, in northern Saskatchewan. The project is host to the high-grade Phoenix and Gryphon uranium deposits, discovered by Denison in 2008 and 2014, respectively. The Wheeler River Joint Venture participants are Denison (90%) and JCU (10%). Denison is the operator/manager of the project.

In June 2023, Denison announced the results of (i) the Phoenix FS completed for ISR mining of the high-grade Phoenix deposit and (ii) the Gryphon PFS Update for conventional underground mining of the basement-hosted Gryphon deposit.

The results of the Phoenix FS and Gryphon PFS Update were summarized in the technical report entitled “NI 43-101 Technical Report on the Wheeler River Project, Athabasca Basin, Saskatchewan, Canada”, filed on August 9, 2023, with an effective date of June 23, 2023 (the “Wheeler Report”), authored by David Myers P.Eng., Lorne Schwartz P.Eng., and Paul O’Hara P.Eng. of Wood; Gordon Graham P.Eng. of Engcomp Engineering and Computing Professionals Inc. (“Engcomp”), Mark Hatton P.Eng. of Stantec Consulting Ltd., Dan Johnson P.E., RM SME, then of WSP USA Environment and Infrastructure Inc., Gregory Newman P.Eng. of Newmans Geotechnique Inc., Jeffrey Martin P.Eng. of Ecometrix Incorporated, Mark Mathisen C.P.G. SLR International Corporation (“SLR”), William McCombe P.Eng. of Hatch Ltd., Cliff Revering P.Eng. of SRK Consulting (Canada) Inc. (“SRK”), and Geoffrey Wilkie P.Eng. of CanCost Consulting Inc.. The Wheeler Report is available on the Companys website, under its profile on the SEDAR+ website at www.sedarplus.ca and on EDGAR at www.sec.gov/edgar.shtml.

The Phoenix FS reflects several design changes and the results of a rigorous technical de-risking program completed by Denison following the publication of the 2018 PFS and confirms robust economics and the technical viability of an ISR uranium mining operation with low initial capital costs and a high rate of return. Highlights of the Phoenix FS include:

Base case pre-tax Net Present Value (“NPV”) (8%) of $2.34 billion (100% ownership-basis) representing a 150% increase in the base-case pre-tax NPV8% for Phoenix from the 2018 PFS.
Very robust base-case pre-tax Internal Rate of Return (“IRR”) of 105.9%.
Adjusted base case after-tax NPV8% of $1.56 billion (100% basis) and IRR of 90.0% – with Denison’s effective 95% interest in the project equating to an adjusted base case after-tax NPV8% of $1.48 billion.
Base case pre-tax and after-tax (adjusted) payback period of 10 months – equating to a reduction of 11 months for the pre-tax payback period from the 2018 PFS.
Optimized production profile, based on ISR mine planning efforts evaluating production potential for individual well patterns – resulting in an increase to the planned rate of production by approximately 43% during the first five years of operations.
Estimated pre-production capital costs of under $420 million (100% basis), yielding a base case after-tax (adjusted) NPV to initial capital cost ratio in excess of 3.7 to 1.
Economics that easily absorb cost-inflation and design changes impacting both operating and capital costs, confirming Phoenix’s position with estimated cash operating and all-in costs expected to be amongst the lowest-cost uranium mines in the world.
Phoenix FS plans aligned and costed to meet or exceed environmental criteria expected to be required by the ongoing regulatory approval process.
Updated mineral resource estimate, reflecting the results of 70 drill holes completed in support of ISR de-risking and resource delineation activities, which has upgraded 30.9 million pounds U3O8 into measured mineral resources, and increased the average grade of the Zone A high-grade domain. This domain is now estimated to contain 56.3 million pounds U3O8 in Measured and Indicated mineral resources at an average grade of 46.0% U3O8.

2024 ANNUAL INFORMATION FORM    30


Upgraded 3.4 million pounds U3O8 into Proven mineral reserves, representing the equivalent of 85% of production planned during the first calendar year of operations.

The Gryphon PFS Update was targeted at the review and update of capital and operating costs. Mining and processing plans remain largely unchanged from the 2018 PFS, aside from minor scheduling and construction sequencing optimizations. The key points include:

Base case pre-tax NPV (8%) of $1.43 billion (100% basis) is a 148% increase in the base-case pre-tax NPV8% for Gryphon from the 2018 PFS.
Strong base-case pre-tax IRR of 41.4%.
Base case after-tax NPV8% of $864.2 million (100% basis) and IRR of 37.6% – with Denison’s effective 95% interest in the project equating to a base case after-tax NPV8% of $821.0 million.
Base case pre-tax payback period of 20 months, and base case after-tax payback period of 22 months – equating to a reduction of 17 months for the pre-tax payback period from the 2018 PFS.
Gryphon remains a highly valuable project that provides Denison with an additional source of low-cost potential production to deploy significant free cash flows expected from Phoenix.

The Wheeler River project description is a summary supported by the Wheeler Report. The Wheeler Report is recommended to be read in its entirety for a more fulsome understanding of the technical aspects of the Wheeler River project. The conclusions, projections and estimates included in this description are subject to the qualifications, assumptions and exclusions set out in the Wheeler Report and in the “Risk Factors” set forth below; in particular, any advancement or development of the Wheeler River project is subject to receipt of required approvals, agreements, or resources, including capital funding.

Property Description, Location and Access

Project Area and Location

Wheeler River is located in the eastern Athabasca Basin, approximately 600 km north of Saskatoon, 260 km north of La Ronge, and 110 km southwest of Points North Landing, in northern Saskatchewan. Wheeler River is comprised of a total of 19 contiguous mineral claims covering 11,720 ha and hosts the Phoenix Deposit and Gryphon Deposit. The Gryphon Deposit is located approximately 3 km northwest of the Phoenix Deposit. The centre of the Wheeler River property is located approximately 35 km northeast of the Key Lake mill and 35 km southwest of the McArthur River mine along Provincial Highway 914.

2024 ANNUAL INFORMATION FORM    31


The Wheeler River property is located within the boundaries of Treaty 10 (entered into between the Government of Canada and the First Nations People of Saskatchewan and Alberta). It is also located within the traditional territory of the English River First Nation, within the homeland of the Métis and within Nuhenéné.

Location Map, Showing Regional and Proposed Infrastructure.

Graphic

Permits, Environmental Liabilities, Royalties and other Encumbrances

Denison has obtained all permits known to be required for the work conducted on the Wheeler River property to date. The advancement of Wheeler River will be subject to comprehensive permitting, approvals and licensing processes. Environmental and permitting considerations for future work are discussed in detail in Section 20 of the Wheeler Report. See “Risk Factors” for more information on this and other potential risks that may affect access, title or the right or ability to perform work on the property.

Wheeler River is subject to royalties on mineral sales and profits levied by the Province of Saskatchewan in accordance with Part III of The Crown Mineral Royalty Regulations. See “Government Regulation - Saskatchewan Royalties” for further details. There is also a 10% Net Profits Interest associated with the property held by the WRJV in proportion to the ownership interests of each WRJV participant, of which Denison is also a beneficiary. There are no other back-in rights or third-party royalties applicable to this property.

2024 ANNUAL INFORMATION FORM    32


Denison has recognized certain environmental liabilities associated with the Wheeler River project in connection with historical and current operations, including without limitation, exploration activities, camp facilities and the feasibility field test conducted at Phoenix in 2022 and 2023.

Access

Access to Wheeler River is by road, helicopter, or fixed-wing aircraft. Vehicle access to Wheeler River is by Highway 914, which terminates at the Key Lake mill. The Wheeler River Project is well located with respect to all-weather roads. The haul road between the Key Lake and McArthur River operations lies within the eastern part of the Wheeler River property.

In 2021, Denison resurfaced the 7.2 km access road from km36 (turn off from Highway 914) to the Phoenix site to facilitate regular vehicle travel and heavy equipment mobilization and demobilization from the site. The sand and gravel used to resurface the road were sourced in very close proximity to the property. The Fox Lake Road between Key Lake and McArthur River provides access to most of the northwestern side of the Wheeler River property. Gravel and sand roads and drill trails provide access by either four-wheel-drive or all-terrain vehicles to the rest of the property.

Climate / Operating Season

The climate is typical of the continental sub-arctic region of northern Saskatchewan, with temperatures ranging from +32°C in summer to -50°C in winter. Winters are long and cold, with mean monthly temperatures below freezing for seven months of the year. Winter snowpack averages 70 to 90 cm. Field operations are possible year-round, except for limitations imposed by lakes and swamps and the periods of break-up and freeze-up. Freezing of surrounding lakes, in most years, begins in November, and break-up occurs around the middle of May. The average frost-free period is approximately 90 days.

The average annual precipitation for the region is approximately 450 mm, of which 70% falls as rain, with more than half occurring from June to September. Snow may occur in all months but rarely falls in July or August. The prevailing annual wind direction is from the west, with a mean speed of 12 km/h.

It is expected that any future mining operations will operate year-round. Field operations currently operate year-round and are conducted from Denison’s Wheeler River camp, 4 km south of the Gryphon Deposit and 3 km southwest of the Phoenix Deposit.

Sufficiency of Surface Rights, Power, Water, Personnel

There are sufficient surface rights for the planned future mining operations, including sufficient land to construct various facilities, including potential waste disposal areas and the process plant.

The site currently generates its own power. The Wheeler River property is also well located with respect to the provincial power grid. Fuel and miscellaneous supplies are stored in the existing warehouse and tank facilities at the Wheeler River camp. Abundant water is available from the numerous lakes and rivers in the area.

To support the local economy, Denison has made a commitment to utilize local businesses whenever possible. Many of these local businesses are also Indigenous-owned. However, given the nature of Denison’s remote operations, mining supplies and labour will also need to be sourced from major centres such as Saskatoon, Regina, and possibly others.

Topography, Elevation, Vegetation

The Wheeler River Project is characterized by a relatively flat till plain with elevations ranging from 477 to 490 metres above sea level (“masl”). Throughout the area, there is a distinctive north-easterly trend to landforms resulting from the passage of Pleistocene glacial ice from the northeast to the southwest. The topography and vegetation at the Wheeler River Project are typical of the taiga forest common to the Athabasca Basin area of northern Saskatchewan.

2024 ANNUAL INFORMATION FORM    33


The area is covered with overburden from 0 to 119 m in thickness. The terrain is gently rolling and characterized by forested sand and dunes. Vegetation is dominated by black spruce and jack pine, with occasional small stands of white birch occurring in more productive and well-drained areas. Lowlands are generally well drained but can contain some muskeg and poorly drained bog areas with vegetation varying from wet, open, non-treed vistas to variable density stand of primarily black spruce and tamarack, depending on moisture and soil conditions. Lichen growth is common in this boreal landscape, mostly associated with mature coniferous stands and bogs.

Significant Risks

Reference should be made to the “Risk Factors” and the factors and risks described in the Wheeler Report for more information.

History

Ownership

The Wheeler River Project was staked on July 6, 1977 and was vended into the WRJV pursuant to the Wheeler River joint venture agreement dated December 28, 1978 (the “Wheeler JV Agreement”), among AGIP Canada Ltd. (“AGIP”), E&B Explorations Ltd. (“E&B”), and Saskatchewan Mining Development Corporation (“SMDC”), with each holding a one-third interest.

On July 31, 1984, all parties divested a 13.3% interest in the WRJV and allowed Denison Mines Limited, a predecessor company to Denison, to earn a 40% interest. On December 1, 1986, E&B allowed PNC Exploration (Canada) Co. Ltd. (“PNC”) to earn a 10% interest from its 20% interest. In the early 1990s, AGIP sold its 20% interest to Cameco (successor to SMDC), resulting in Cameco holding 40%. In 1996, Imperial Metals Corporation (successor to E&B), sold its remaining 8% interest to Cameco and 2% interest to PNC. Participating interests became Cameco 48%, PNC 12%, and Denison 40%.

In late 2004, Denison earned a further 20% interest from the other parties to the WRJV, after which the participating interests were Denison 60%, Cameco 30%, and JCU (a successor to PNC) 10%. Since November 2004, Denison has been the operator of the WRJV.

In January 2017, Denison executed an agreement with the partners of the WRJV to fund 50% of Cameco’s ordinary share of joint venture expenses in 2017 and 2018 in exchange for a transfer of a portion of Cameco’s interest. Based on spending during 2017, Denison increased its interest in the WRJV to 63.3%. In October 2018, Denison acquired all of Cameco’s remaining interest, and the WRJV became Denison (90%) and JCU (10%).

In August 2021, Denison acquired an additional 5% indirect interest in the Wheeler River Project through the acquisition of a 50% ownership interest in JCU. Denison currently has an effective 95% ownership interest in the WRJV.

Development History

The Phoenix project is still at the advanced exploration stage and, except in connection with the FFT, no production has occurred on the property to-date.

Geological Setting, Mineralization and Deposit Types

Regional, Local and Property Geology

Wheeler River is located near the southeastern margin of the Athabasca Basin in the southwest part of the Churchill Structural Province of the Canadian Shield. The Athabasca Basin is a broad, closed, and elliptically shaped cratonic basin with an area of 425 km east-west by 225 km north-south. The bedrock geology of the Athabasca basin area consists of Archean and Paleoproterozoic gneisses unconformably overlain by up to 1,500 m of flat-lying unmetamorphosed sandstones and conglomerates of the mid-Proterozoic Athabasca Group.

2024 ANNUAL INFORMATION FORM    34


Wheeler River is located near the transition zone between two prominent litho-structural domains within the Precambrian basement, namely the Mudjatik Domain to the west and the Wollaston Domain to the east. The Mudjatik Domain is characterized by elliptical domes of Archean granitoid orthogenesis separated by keels of metavolcanic and metasedimentary rocks. The Wollaston Domain is characterized by tight to isoclinal, northeasterly trending, doubly plunging folds developed in Paleoproterozoic metasedimentary rocks of the Wollaston Supergroup, which overlie Archean granitoid orthogenesis identical to those of the Mudjatik Domain. The area is cut by a major northeast-striking fault system of Hudsonian Age. The faults occur predominantly in the basement rocks but often extend up into the Athabasca Group due to several periods of post-depositional movement. Local geology is very much consistent with the regional geology.

Phoenix

Phoenix was discovered in 2008 and can be classified as an unconformity-associated deposit of the unconformity-hosted variety. The deposit straddles the sub-Athabasca unconformity approximately 400 m below surface and comprises three zones (A, B, C and D) which cover a strike length of about 1.1 km. The Phoenix deposit’s zones A and B comprise an exceptionally high-grade core, averaging 46.0% and 22.3% U3O8, respectively. A lower-grade shell surrounds the high-grade core. The basement mineralization at Zone A occurs within local dilation zones near both ends of the deposit associated with the interpreted cross faults. No mineral resources have been estimated for either Zone C or Zone D.

Phoenix is interpreted to be structurally controlled by the WS Shear, a prominent basement thrust fault which occurs footwall to a graphitic-pelite and hanging wall to a garnetiferous pelite and quartzite unit. A minor amount of basement, fracture-hosted mineralization occurs within local dilation zones near both ends of the deposit associated with the interpreted cross faults.

The mineralization within the Phoenix deposit is dominated by massive to semi-massive uraninite associated with an alteration assemblage comprising hematite, dravitic tourmaline, illite and chlorite. Secondary uranium minerals, including uranophane and sulphides, are trace in quantity. Average nickel, cobalt, and arsenic concentrations are at the low end of the range found in other uranium deposits in the Athabasca basin.

Phoenix Zones A and B exhibit elevated concentrations of certain rare earth elements. While there is a strong correlation between the REEs and uranium mineralization, the correlation between heavy rare earth elements and the high-grade uranium domains is comparatively stronger than the correlation between high-grade uranium mineralization and light rare earth elements.

Gryphon

Gryphon was discovered in 2014 and can be classified as an unconformity-related deposit of the basement-hosted variety. The deposit occurs within southeasterly dipping crystalline basement rocks of the Wollaston Supergroup below the regional sub-Athabasca Basin unconformity. The deposit is located from 520 to 850 m below surface, has an overall strike length of 610 m and dip length of 390 m, and varies in thickness between 2 and 70 m, depending on the number of mineralized lenses present.

A series of 24 stacked lenses referred to as the A, B, C, D and E-series, are controlled by reverse fault structures, which are mainly conformable to the basement stratigraphy and dominant foliation. The A, B and C series of lenses comprise stacked, parallel lenses that plunge to the northeast along the G-Fault, which occurs between hangingwall graphite-rich pelitic gneisses and a more competent pegmatite-dominated footwall. A ubiquitous zone of silicification (Quartz-Pegmatite Assemblage) straddles the G-Fault, and the A, B and C series of lenses occur in the hangingwall of, within, and in the footwall of the Quartz-Pegmatite Assemblage, respectively. The D series lenses occur within the pegmatite-dominated footwall along a secondary fault zone (Basal Fault) or within extensional relay faults which link to the G Fault. The E series lenses occur along the G-Fault, up-dip and along strike to the northeast of the A and B series lenses, within the upper basement or at the sub-Athabasca unconformity. The E series of lenses differ from the remaining sets of lenses as they do not follow the local scale plunge of the deposit. Instead, the mineralization is located planar to foliation and tight to the unconformity. The E series lenses are the only lenses to host unconformity mineralization at Gryphon.

Mineralization within the Gryphon deposit lenses is dominated by massive, semi-massive or fracture-hosted uraninite associated with an alteration assemblage comprising hematite, dravitic tourmaline, illite, chlorite and kaolinite. Secondary uranium minerals, including uranophane and carnotite, and sulphides are trace in quantity.

2024 ANNUAL INFORMATION FORM    35


Gangue mineralogy is dominated by alteration clays (illite, kaolinite, chlorite), dravite and hematite with minor relict quartz, biotite, graphite, zircon, and ilmenite. Only trace concentrations of sulphides, comprising galena, chalcopyrite, and pyrite, are noted. Notable concentrations of molybdenum and lithium have also been identified within and around the mineralization, represented visually as lepidolite and molybdenite.

Mineral Deposit Type

The Phoenix and Gryphon Deposits are classified as an Athabasca Basin unconformity-associated (also unconformity-related and -type) uranium deposit. Phoenix straddles the unconformity contact between the Athabasca sandstone and the underlying basement, signifying the unconformity as a major fluid pathway for uranium mineralization. Gryphon is primarily hosted in the basement rocks, with minor portions of the deposit situated at the unconformity.

Unconformity-associated uranium deposits are pods, veins, and semi-massive replacements consisting of mainly uraninite, close to basal unconformities, in particular those between Proterozoic conglomeratic sandstone basins and metamorphosed basement rocks. The uranium deposits in the Athabasca Basin occur below, across, and immediately above the unconformity, which can lie within a few metres of surface at the rim of the Basin to over 1,000 m deep near its centre. The deposits are formed by extensive hydrothermal systems occurring at the unconformity’s structural boundary between the older and younger rock units.

Two end-members of the deposit model have been defined: (1) a sandstone-hosted egress-type model (i.e., Midwest A deposit) involved the mixing of oxidized sandstone brine with relatively reduced fluids issuing from the basement into the sandstone, and (2) a basement-hosted, ingress-type deposits (i.e., Rabbit Lake deposit) formed by fluid-rock reactions between oxidizing sandstone brine entering basement fault zones and the local wall rock.

Unconformity-type uranium deposits are surrounded by extensive alteration envelopes. In the basement, these envelopes are generally relatively narrow but become broader where they extend upwards into the Athabasca Group for tens of metres to even 100 m or more above the unconformity. Hydrothermal alteration is variously marked by chloritization, tourmalinization (high boron, dravite), hematization (several episodes), illitization, silicification/desilicification, and dolomitization. Modern exploration for these types of deposits relies heavily on deep-penetrating geophysics and whole-rock geochemical results from core samples.

Recently, basement-hosted deposits have become more recognized as a viable exploration target through the development of Eagle Point mine and the discovery of deposits such as Millennium, Triple R, and Arrow. Exploration typically requires the recognition of significant fault zones within basement metasediments (often associated with graphite) with associated clay and geochemical alteration haloes.

Exploration

Excluding the years 1990 to 1994, exploration activities comprising airborne and ground geophysical surveys, geochemical surveys, prospecting, and diamond drilling have continuously been carried out on the Wheeler River property from 1978 to present.

After the discovery of the Key Lake deposits in 1975 and 1976, the Key Lake exploration model has emphasized the spatial association between uranium deposition at, immediately above, or immediately below the unconformity with graphitic pelitic gneiss units in the basement subcrop under the basal Athabasca sandstone. The graphitic pelitic gneiss units are commonly intensely sheared and are highly conductive in contrast to the physically more competent adjoining rock types that include semipelitic gneiss, psammite, meta-arkose, or granitoid gneiss. From the late 1970s to the present, the Key Lake model has helped discover blind uranium deposits throughout the Athabasca Basin, although it is worth noting that the vast majority of EM conductors are unmineralized.

Following the Key Lake exploration model, EM techniques were the early geophysical methods of choice for the Wheeler River Project area from 1978 to 2004. More than 152 line-km of electromagnetic (“EM”) conductors have been delineated on the Wheeler River Project to depths of 1,000 m through the quartz-rich Athabasca Group sandstones that are effectively transparent from an EM perspective. These conductors or conductor systems were assigned a unique designation, and follow-up exploration drilling successfully identified several zones of uranium mineralization.

2024 ANNUAL INFORMATION FORM    36


Since 2004, Denison has completed ground geophysical surveys over the Wheeler River property, including the DC resistivity surveys that identified the drilling target that led to the discovery of the Phoenix deposit in 2008. In 2004, a GEOTEM airborne EM and magnetic survey collected data covering the entire Wheeler River Project, while a FALCON airborne gravity gradiometer survey in 2005 targeted the unconformity uranium mineralization. A helicopter-borne versatile time-domain electromagnetic (“VTEM”) magnetic-radiometric survey was conducted over the Wheeler River Project in 2013 in an attempt to remove noise in the interpretation of a previous survey. Resistivity and EM surveys continue to be the preferred ground geophysical surveying methods on the Wheeler River project, with the most recent survey consisting of a Stepwise Moving Loop EM (SWML EM) survey initiated in late 2024.

Drilling

Diamond drilling has been the principal method of exploration and delineation of uranium mineralization after initial geophysical surveys. Drilling can generally be conducted year-round. Since 1979, over 1,000 diamond drill holes and 84 reverse circulation (“RC”) drill holes totalling in excess of 490,000 m have been completed on the Wheeler River property.

Phoenix

Since 2008, 318 drill holes totalling 145,982 m have delineated the Phoenix deposit. The Phoenix deposit area has been systematically drill tested over approximately 1 km of strike length at a nominal spacing of 25 to 50 m northeast-southwest by 10 m northwest-southeast (perpendicular to strike). Delineation diamond drilling at Phoenix was primarily done with NQ sized core (47.6 mm diameter) in holes WR-249 through WR-275 and HQ sized core (63.5 mm diameter) reducing to NQ at 350 m in holes thereafter, with most holes successfully penetrating into the basement. Some additional infill holes were drilled primarily to test the spatial continuity of the mineralization.

2024 ANNUAL INFORMATION FORM    37


The bulk of the flat-lying high-grade mineralization is positioned at and sub-parallel to the unconformity.

Phoenix Drilling Completed by Denison

Year

    

No. of Holes

    

Total Drilled (m)

    

Comments

2008

 

6

 

2,704

 

Discovery hole WR-249 drilled to test resistivity Target A. Hole WR-251 drilled to test Target B. Follow-up drilling testing mineralization to the southeast of WR-251

2009

 

39

 

18,805

 

Drilling higher-grade mineralization with additional drilling testing the continuity of the high-grade portion of the mineralized zone

2010

 

56

 

26,937

 

-

2011

 

66

 

32,553

 

-

2012

 

49

 

23,712

 

-

2013

 

22

 

11,064

 

Infill delineation drilling on Phoenix Zone A

2014

 

13

 

6,121

 

Drilling completed on Phoenix Zone A to extend high-grade portions

2015

 

2

 

1,557

 

-

2016

 

3

 

1,748

 

Diamond drilling completed in Phoenix Zone A to test ground conditions of proposed site infrastructure

2017

 

5

 

524

 

Drill holes completed in Phoenix Zone A to collect samples for metallurgical testing and further test ground conditions of proposed site infrastructure

2018

 

 

 

-

2019

 

7

 

2,518

 

Drilling wells to test hydraulic connectivity of Phoenix Zone A and rock mass surrounding the deposit

2020

 

22

 

7,571

 

PQ-sized environmental monitoring wells. Exploration drilling targeting the gap between Phoenix Zones A and B, and Phoenix Zones B and C

2021

 

15

 

5,990

 

15 wells drilled within Mining Phase 1 and two exploration holes

2022

 

10

 

4,177

 

PQ-sized monitoring wells in Mining Phase 1, 2 and 4

2023

 

 

  

 

-

2024

 

6

 

2,304

 

PQ/NQ-Sized drilling in 5 holes within Phase 1 and 2, for freeze well (2), monitoring (3), and injection well (1) test work.

Gryphon

The first exploration drilling in the Gryphon area began in 1988 and continued intermittently through 2013. In 2014, Denison completed a drilling campaign of 23 holes for 16,666 m, which included the Gryphon discovery hole WR-556. Following the discovery of Gryphon, definition drilling has been carried out on all lenses (A through E series). To date, Denison and predecessor companies have drilled 280 holes, totalling 157,934 m, in the immediate Gryphon deposit area, of which 216, totalling 119,720 m, drilled between 1985 and 2017, have delineated the Gryphon deposit. Diamond drilling at Gryphon was primarily done with NQ-sized core (47.6 mm diameter) with most holes angled between 60° and 79° to the northwest.

Gryphon Drilling Completed by Denison

Year

    

No. of Holes

    

Total Drilled (m)

2013

 

3

 

1,515

2014

 

26

 

17,915

2015

 

53

 

30,861

2016

 

73

 

43,605

2017

 

91

 

43,273

2018

 

23

 

14,157

2023

 

2

 

1,334

2024 ANNUAL INFORMATION FORM    38


Sampling, Analysis and Data Verification

See “Athabasca Exploration: Sampling, Analysis and Data Verification” for details.

Mineral Processing and Metallurgical Testing

Phoenix

Test programs, including various forms of leaching tests, process plant circuit tests, and effluent and solid waste streams treatment steps, have been conducted on the Phoenix deposit before and during the Phoenix FS. The results of the tests indicate the ability to leach uranium using in-situ techniques, allow a representative recovery curve to be assembled, and indicate geochemistry requirements for subsurface remediation.

Leaching testwork for Phoenix has included:

Grinding, leaching, and conventional downstream milling tests in 2014 conducted by Saskatchewan Research Council (“SRC”)
Batch leach tests and bottle roll/agitation leach tests in 2017 conducted by Inter-Mountain Laboratories Inc. with alkaline and acidic based lixiviants
Leach temperature tests on crushed core in 2020 conducted by SRC
Column leach tests on blended crushed core in 2021 conducted by SRC
Column leach and remediation tests on crushed and screened core from individual hydrogeologic units (variability) conducted by SRC in 2022
Static uranium ore dissolution (jar) test on intact core in 2018 conducted by SRC
Coreflood tests on intact core in 2018 to 2022 conducted by SRC
FFT leaching and remediation in 2022 conducted by Denison

The main objective of the FFT was to demonstrate injection of lixiviant and recovery of uranium bearing solution from the commercial scale well test pattern. The FFT was a full-scale proof of concept of the ISR method in a thick and high-grade area of the deposit likely to be targeted for initial production.

The following process plant testwork has been conducted on the Phoenix deposit. The results informed the criteria and design of the process plant described in the Phoenix FS, with specific attention paid to environmental requirements for waste streams and to end-product quality.

Four batch testing campaigns in 2021 and 2022, by SRC, of the following circuits: Iron and radium precipitation (using NaOH and lime), yellowcake (“YC”) precipitation, YC drying/calcining, and two stages of effluent treatment
Five zero valent iron (“ZVI”) tests in 2022, by SRC, using fixed bed columns, for selenium removal as option for third stage of the effluent treatment
Tests conducted in 2022 of third-party proprietary ion exchange and electroreduction (“IX/ER”) technology, as an option for selenium removal from treated effluent

2024 ANNUAL INFORMATION FORM    39


Gryphon

In 2017, Denison undertook a metallurgical testwork program at SRC Geoanalytical Laboratories, directly managed by Denison. Denison also completed a parallel test program at the Orano Service d’Études de Procédés et Analyses (“SEPA”) laboratories at Bessines-sur-Gartempe, France. SRC and SEPA are ISO 17025 certified. The objectives of the testwork programs were to further develop the optimum processing conditions and collect additional data to support engineering design, including confirming the adequacy of the McClean Lake mill for processing Gryphon ore. Tests conducted, included: grinding test; leaching tests on three composite samples to validate leaching characteristics; settling and filtration tests; solvent extraction tests; yellowcake precipitation tests; and a tailings neutralization test.

Mineral Resource and Mineral Reserve Estimates

Mineral resources are reported in accordance with CIM Definition Standards (CIM, 2014) and prepared in accordance with the CIM Estimation of Mineral Resources and Mineral Reserves Best Practice Guidelines (CIM, 2019).

The estimates for Phoenix are presented assuming ISR extraction. The estimates for Gryphon are presented assuming underground mining methods.

Denison is not aware of any environmental, permitting, legal, title, taxation, socio-economic, marketing, political, or other relevant factors that could materially affect the mineral resource estimate, other than what is described in this AIF and the Wheeler Report. See “Risk Factors”.

Phoenix Mineral Resource Statement, Effective Date June 23, 2023

    

    

    

    

    

Average 

    

Volume

Density

Tonnes

Grade

Contained U3O

Confidence Category

Domain

(x1000 m³)

(g/cm³)

(kt)

(%U3O8)

(Mlb)

Measured

 

ZoneA_HG

 

6.7

 

3.84

 

25.9

 

50.7

 

28.9

 

ZoneA_LG

 

16.5

 

2.33

 

38.3

 

2.3

 

2.0

 

Total

 

23.2

 

2.77

 

64.2

 

21.8

 

30.9

Indicated

 

ZoneA_HG

 

8.8

 

3.37

 

29.6

 

42.0

 

27.4

 

ZoneA_LG

 

57.9

 

2.33

 

134.8

 

2.0

 

5.8

 

ZoneB_HG

 

4.3

 

2.66

 

11.5

 

22.3

 

5.7

 

ZoneB_LG

 

17.1

 

2.34

 

40.1

 

0.9

 

0.8

 

Total

 

88.1

 

2.45

 

216.0

 

8.3

 

39.7

Total Measured and Indicated

 

  

 

111.3

 

2.52

 

280.2

 

11.4

 

70.5

Inferred

 

ZoneA_Bsmt

 

2.4

 

2.34

 

5.6

 

2.6

 

0.3

Notes:

(1)Mineral resources are reported at a cut-off grade of 0.1% U3O8.
(2)Mineral resources are reported using a uranium price of US$55/lb U3O8 and total combined mining, processing and G&A operating costs of US$5.85/lb U3O8.
(3)Mineral resources are inclusive of mineral reserves.
(4)All figures have been rounded to reflect the relative accuracy of the estimate and may not sum due to rounding.

Due to the high-grade nature of the Phoenix deposit, additional infill drilling related to installation of an ISR well field will provide further definition of the high-grade uranium mineralization within the deposit footprint, leading to possible changes in the estimated uranium content. However, it is estimated that, given the current drill density within the deposit, any possible changes to the estimated uranium content would not be material based on the current geological understanding of the deposit.

2024 ANNUAL INFORMATION FORM    40


Phoenix Mineral Reserve Statement, Effective Date June 23, 2023

Tonnes

Grade

Recoverable U3O8

Confidence Category

    

(kt)

    

(% U3O8)

    

(Mlb)

Proven

 

  

 

  

 

  

Phase 1

 

6.3

 

24.5

 

3.4

Subtotal Proven

 

6.3

 

24.5

 

3.4

Probable

 

 

 

Phase 1

 

41.3

 

20.2

 

18.4

Phase 2

 

45.2

 

13.8

 

13.7

Phase 3

 

20.3

 

11.0

 

4.9

Phase 4

 

68.9

 

7.2

 

10.9

Phase 5

 

37.0

 

6.6

 

5.4

Subtotal Probable

 

212.7

 

11.4

 

53.3

Total Proven and Probable

 

219.0

 

11.7

 

56.7

Notes:

(1)Mineral reserves are estimated at a cut-off grade of 0.5% U3O8 based on the ISR mining method, using a long-term uranium price of US$50/lb U3O8 and a CA$/US$ exchange rate of 1.33. The mineral reserves are based on a mine operating cost of $0.78/lb U3O8, process operating cost of $5.20/lb U3O8, and process recovery of 99%.
(2)A mine recovery of 80.6% has been applied to the tonnage to convert the mineral resources to mineral reserves. Recoverable U3O8 refers to ISR recoverable and does not account for process losses.

The aggregate mine feed to the plant has been estimated to contain 56.7 million pounds U3O8. This represents 80.6% recovery of the measured and indicated mineral resource available for in-situ recovery and is the mineral reserve estimate determined from this study.

The FS analyzed the varying recovery rates amongst hydrogeological units (“HGUs”) and was a significant step in the definition of ISR efficacy for this deposit. Recovery varies based on the permeability and geochemistry of the HGUs and their interaction with adjoining units. To characterize the behaviour of ISR, a hydraulic tomography model was developed to estimate permeabilities in three dimensions throughout the deposit. These values were used in a hydrogeologic simulation to calculate in-situ flows between injection and recovery wells through the HGUs. The resulting flow field was input to a geochemical model to simulate recovery per well, per HGU. This recovery result was used to revise the well layout and individual flows in the hydrogeologic model. Several iterations of this modelling system were run to realize the optimized result. The recovery curve used as a basis for the geochemical model was obtained empirically from metallurgical testing.

In determining the conversion of mineral resources to mineral reserves for the application of the ISR mining method to a heterogeneous unconformity-style deposit, several modifying factors were considered. These include, but were not restricted to, mining, processing, metallurgical, infrastructure, economic, marketing, legal, environmental, social, and government factors. While a significant portion of the Phoenix mineral resource is classified as measured, demonstrating the highest degree of confidence in relation to geologic parameters, the cumulative assessment of all modifying factors supports the classification of probable mineral reserves for a large portion of the deposit, with a requirement of higher confidence in the modifying factors achieved through operating experience.

Estimated proven mineral reserves are based on the 2022 FFT, which provided additional confidence in the ISR method and ability to recover U3O8 within the tested region of the deposit. A stockpile of 14,400 lb U3O8 in uranium bearing solution was recovered to surface during the FFT, representing the initial ramp-up of a leach recovery curve. To calculate the proven mineral reserves, the recovery determined through computer modelling for Phase 1 was applied to the estimated in situ mass contacted during the FFT.

2024 ANNUAL INFORMATION FORM    41


Gryphon Mineral Resource Statement, Effective Date August 7, 2018

    

    

Tonnes

    

Grade 

    

Contained U3O

Confidence Category

Mineralized Domain

(kt)

(%U3O8)

(Mlb)

Indicated

 

Gryphon A1HG

 

148

 

7.6

 

24.7

 

Gryphon A1LG

 

365

 

0.8

 

6.7

 

Gryphon A2

 

262

 

1.0

 

5.5

 

Gryphon A3

 

36

 

0.4

 

0.3

 

Gryphon B1

 

161

 

1.1

 

3.7

 

Gryphon B2

 

158

 

1.5

 

5.2

 

Gryphon B3

 

59

 

1.3

 

1.7

 

Gryphon C1

 

105

 

1.2

 

2.7

 

Gryphon D1HG_HW

 

17

 

5.0

 

1.8

 

Gryphon D1HG_MD

 

11

 

7.4

 

1.8

 

Gryphon D1HG_FW

 

15

 

7.5

 

2.5

 

Gryphon D1LG

 

153

 

0.6

 

1.9

 

Gryphon D4

 

89

 

0.7

 

1.4

 

Gryphon E2

 

65

 

1.1

 

1.7

Total Indicated

 

Gryphon

 

1,643

 

1.7

 

61.9

Inferred

 

Gryphon A4

 

2

 

0.3

 

0.0

 

Gryphon B5

 

10

 

0.3

 

0.1

 

Gryphon D2

 

5

 

0.4

 

0.0

 

Gryphon D3

 

13

 

1.2

 

0.4

 

Gryphon E1

 

31

 

1.3

 

0.9

 

Gryphon E2

 

12

 

2.0

 

0.5

Total Inferred

 

Gryphon

 

73

 

1.2

 

1.9

Notes:

(1)Mineral resources for the Gryphon Deposit are constrained by underground mining shapes using a minimum mining width of 2 m and an incremental cut-off grade of 0.2% U3O8. The cut-off grade includes considerations of a long-term uranium price of US$55/lb, US$/CA$ exchange rate of 0.75, process recovery of 97%, an underground mine operating cost of $130/t, haulage cost of $32/t, process operating cost of $280/t, G&A cost of $104/t and incremental operating cost component of $260/t for low-grade material.
(2)High-grade mineralization was capped at 30% U3O8 and restricted at 20% U3O8 for the A1HG and capped at 20% U3O8 for the D1HG with no search restrictions.
(3)Low-grade mineralization was capped at 20% U3O8 for the C1 domain, with search restrictions applied to U3O8 grades greater than or equal to 10.0% U3O8.
(4)Low-grade mineralization was capped at 15% U3O8 for the B1, B2, E1, and E2 domains with search restrictions applied to U3O8 grades greater than or equal to 10.0% U3O8 for the B1 domain and 5.0% U3O8 for the E2 domain.
(5)Low-grade mineralization was capped at 10% U3O8 for the A1-A4, B3-B7, C4-C5, and D2-D4 domains with no search restrictions.
(6)Low-grade mineralization was capped at 5% U3O8 for the D1 domain with no search restriction.
(7)Bulk density is derived from grade using a formula based on 279 measurements from Gryphon.
(8)Mineral resources are reported inclusive of mineral reserves.
(9)Figures may not sum due to rounding.

2024 ANNUAL INFORMATION FORM    42


Gryphon Mineral Reserve Statement, Effective Date September 1, 2018

    

Tonnes 

    

Grade 

    

Contained U3O

Confidence Category

(Mt)

(% U3O8)

(Mlb)

Probable

 

1.257

 

1.8

 

49.7

Total

 

1.257

 

1.8

 

49.7

Notes:

(1)Mineral reserves are stated at a processing plant feed reference point.
(2)Mineral reserves for the Gryphon Deposit are estimated at a cut-off grade of 0.58% U3O8 based on longhole mining using a long-term uranium price of US$50/lb and a US$/CA$ exchange rate of 0.8. The mineral reserves are based on a mine operating cost of $150/t, mill operating cost of $275/t, G&A cost of $99/t, transportation cost of $50/t, milling recovery of 97%, and 7.25% fee for Saskatchewan royalties. Mineral reserves include diluting material and mining losses.

The mineral reserve for Gryphon is estimated at 49.7 Mlb U3O8 (1.2 Mt grading at 1.8% U3O8) as summarized in the above table.

The mine design and mineral reserve estimate have been completed to a level appropriate for a PFS. The Gryphon block model did not include any measured mineral resource material. All mineral reserves were converted from indicated mineral resources and are classified as probable mineral reserves. The inferred mineral resources contained within the mine design are considered as waste.

Mining Operations

Phoenix

The uranium ISR process, as proposed for Phoenix, involves the preparation of an acidic mining solution in the process plant that is transferred to the injection solution handling system at the wellfield to cause the dissolution of uranium compounds from the targeted mineralized zone. The acidic solution will dissolve and mobilize the uranium, allowing the dissolved uranium to be pumped to the surface as uranium bearing solution (“UBS”). UBS is recovered from the wellfield and transferred to the nearby process plant for uranium precipitation, drying, and packaging.

Containment of the solution is a requirement in ISR operations to ensure recovery of the uranium and to minimize regional groundwater infiltration into the mineralized zone and associated dilution of the mining solution. For Phoenix, it is proposed that artificial ground freezing will be implemented around the perimeter of the mineralized zone creating a vertical hydraulic barrier between the ISR zone and the external natural hydrogeology. The freeze wall will be established by drilling a series of vertical cased holes from surface and keying them into the basement rock. Circulation of a low temperature brine solution in the holes will remove heat from the ground, freezing the natural groundwater, and establishing an impermeable frozen wall around the deposit.

Benefits of ISR operations relative to traditional mining methods generally include:

Minimal environmental impacts, including low noise, dust, and air emissions, low water consumption levels, minimal surface disturbance, and reclamation of the area.
Ability to scale production up or down to meet market demands.
Low initial capital costs and short timeframe to production.
Low operating costs.
Enhanced safety practices and procedures for workers – with minimal exposure to natural radiation associated with high-grade uranium orebodies and no requirement to work in an underground mining setting (as all work is performed from surface).

2024 ANNUAL INFORMATION FORM    43


As detailed in the Wheeler Report, the Company’s evaluation of the ISR mining method at Phoenix has identified several significant environmental and permitting advantages, particularly when compared to the impacts associated with conventional uranium mining in Canada. The proposed ISR mining operation for Phoenix is expected to produce a low tonnage of solid waste relative to conventional uranium mill tailings, generate very small volumes of waste rock, and has the potential for low volumes of treated water discharge to surface water bodies, as well as the potential to use the existing power grid to operate on a near zero carbon emissions basis.

The planned use of ground freezing to isolate the ISR operation has the potential to streamline the mining process, minimize interaction with the environment, and facilitate controlled reclamation of the site at decommissioning.

Taken together, ISR mining at Phoenix has the potential to achieve a superior standard of environmental sustainability when compared to conventional mining and milling operations.

Gryphon

The planned mining method for Gryphon is conventional longhole stoping with backfill. Longhole stoping is a widely used conventional mining method applied in both the Canadian uranium industry as well as in the broader mining industry for the extraction of base metals, gold, and other commodities.

According to the planned approach, access to the Gryphon deposit will be established through two shafts. The primary shaft will provide for movement of personnel and supplies, ore/waste hoisting, and fresh air to the underground operations. The second shaft will be solely for exhaust air and secondary egress. Heated fresh air will be delivered via the production shaft, with return air exhausted up the ventilation shaft. Both shafts will be excavated through blind boring methods. Blind bored shafts have been selected for vertical access in favour of typical full-face shaft sinking with cover grouting or freeze curtain protection. Blind bored shafts offer more competitive costs and construction schedules, and a reduced risk profile while sinking through saturated ground conditions. A composite steel/concrete liner will be installed over the full length of the shaft and grouted into basement rock. The main mine dewatering system will consist of a clean water pumping system that will pump decanted water to surface via piping in the ventilation shaft.

Access from the production shaft to the mine workings will be via a single ramp located on the hangingwall. Stope overcut and undercut drifts will include 100% shotcrete coverage and 150 mm of ballast on the floor to reduce the potential for radiation exposure.

The mine has been divided into five mining blocks, E Zone, Lower D, Upper and Lower Main, and Upper SW. Each mining block will be mined from the bottom up. Ore will be truck hauled to a rockbreaker/grizzly station and hoisted to surface. The mine is expected to produce approximately 605 t/d of ore and an average of 330 t/d of waste rock during the steady state operating period.

The Gryphon PFS Update assumes that the ore will be hoisted to surface and transported to the McClean Lake mill for processing. A two-year ramp-up to full production is planned, with the full production rate set at 9 million pounds U3O8 per year. Processing at the McClean Lake mill will require the negotiation and execution of a toll milling agreement, which is not currently established, and will also require regulatory approvals, which have not been obtained.

Processing and Recovery

Phoenix

The uranium bearing solution from the Phoenix wellfield will be directed to a self-contained processing facility located adjacent to the wellfield. The process design was developed from the process plant testing campaigns, using UBS column leach test solution as feed.

In the process plant, the first step is removal of impurities such as iron and radium from the UBS as solids in the stage 1 (Fe/Ra) precipitation circuit. The stage 1 solids are placed as filter cake in totes on a storage pad, for shipment offsite. Next, the purified leach solution (“PLS”) feeds the stage 2 (YC) precipitation circuit, producing uranyl peroxide YC product solid, which is then dried and packaged for shipment.

2024 ANNUAL INFORMATION FORM    44


The barren leach solution (“BLS”) from stage 2 (YC) precipitation feeds the effluent treatment (ET) circuit, comprised of three stages. The first ET stage (ET stage 1) is low pH neutralization, which precipitates most of the remaining radionuclides. The resulting solids are placed as filter cake in totes along with the process plant stage 1 (Fe/Ra) precipitation circuit cake product. The second stage (ET stage 2) is high pH neutralization, which removes most of the remaining dissolved solids, forming a waste solids stream composed mainly of gypsum. This is pumped as slurry to a disposal pond for consolidation. The third ET stage neutralization (ET stage 3) targets selenium removal and adjusts final pH to near neutral. A small selenium-bearing waste solids stream is blended with the gypsum waste for disposal.

The different types of chemical reagents will be stored, used, and managed to ensure worker and environmental safety in accordance with standards developed by regulatory agencies and vendors.

Uranium recovery was estimated by evaluating the losses of the individual circuits and combining into an overall steady state recovery. The final mass balance recovery is estimated to be 96.5%, as shown in the following table:

Phoenix Process Plant Steady State Recovery

    

Uranium Content

Item

(%)

Process plant feed

 

100.0

Fe/Ra losses

 

3.0

ET losses

 

0.5

Process plant recovery

 

96.5

It is estimated that during the ramp-up period for production recovery will be lower, resulting in a Year 1 recovery of 93.4% and a life of mine (“LOM”) process plant recovery of 96.3%.

The majority of the Fe/Ra and ET losses end up in the process precipitate solids (“PPS”). Preliminary estimate for recovery of uranium from reprocessing the PPS is 90%. The recovery from the PPS potentially increases the overall Phoenix recovery by 2.7%. The LOM recovery is summarized in the following table:

Phoenix Life of Mine Recovery

    

Uranium Recovery

Item

(%)

Process plant recovery

 

96.3

Process precipitate solids recovery

 

2.7

Overall Phoenix recovery

 

99.0

Gryphon

The Gryphon PFS Update assumes that Gryphon ore will be transported to the McClean Lake mill for processing. The mill is currently processing material from the Cigar Lake mine; however, it has additional licensed processing capacity to a total annual production of up to 24 million pounds U3O8.

The mine plan for Gryphon aligns well with expected available capacity at the McClean Lake mill. Proposed Gryphon Deposit production scenarios do not exceed McClean Lake’s production capacity given certain assumptions regarding future production from the Cigar Lake mine. Gryphon ore is expected to be milled in parallel to Cigar Lake Phase 2 production, assumed in the Wheeler Report to be up to 15 million pounds U3O8 per year, allowing for Gryphon ore processing at a peak of 9 million pounds U3O8 per year.

Processing the Gryphon Deposit will require certain modifications to the McClean Lake mill. These modifications include expansion of the leaching circuit, the addition of a filtration system to complement the counter current decantation circuit capacity, the installation of an additional tailings thickener, and expansion of the acid plant. Various other upgrades will also be required throughout the mill to permit production at the full licensed capacity.

2024 ANNUAL INFORMATION FORM    45


Infrastructure, Permitting and Compliance Activities

Phoenix Infrastructure

The Phoenix site layout is reasonably compact around the deposit, and working within the natural terrain where practical, to limit environmental disturbance. Modular or temporary facilities are planned where practical to reduce impact and simplify site closure. The camp is designed for 100 occupants and for expansion to 150 if and as needed.

Phoenix Indicative Site Plan

Graphic

2024 ANNUAL INFORMATION FORM    46


The site plan is organized into radiological areas for control purposes. The wellfield, plant and nearest ponds are designated site locations where radioactive materials may be used or stored. Unauthorized persons are prohibited from entering radiation areas. The camp and operations facilities south of the production area are deemed non-radiation areas. Non-radiation areas are areas where no radioactive materials are used or stored. The main site road will form a tertiary barrier between the radiation and non-radiation areas.

The planned infrastructure includes a gravel road from Highway 914 to site and an electrical power line from existing SaskPower distribution. A new airstrip and domestic and construction waste management areas are also included in site infrastructure plans.

Water is drawn from Whitefish Lake to the east. Well water is also available, which will be used to prepare potable water in the treatment plant near the camp. Domestic wastewater is sent to a mechanical treatment plant which produces water usable in the wellfield, and solids that are disposed in the industrial landfill.

Phoenix Permitting and Compliance Activities

Environmental studies of the Phoenix ISR operation are significantly advanced. Baseline environmental data collection, technical assessments, plus extensive engagement and consultation with Indigenous and non-Indigenous interested parties have been completed with sufficient rigor to support development and submission of the draft EIS, and associated technical documents, to the provincial and federal regulators in 2022. The EIS outlines the Company’s assessment of the potential effects, including applicable mitigation measures, of the proposed ISR uranium mine and processing plant planned for Wheeler River.

Based on the information and related evaluation and assessment of effects, results show that the ISR operation can be constructed, operated, and decommissioned in a manner that is not likely to cause significant residual adverse effects to the biophysical or human environments, on its own or cumulatively with existing and reasonably foreseeable developments. Importantly, the Phoenix FS designs and plans incorporate learnings and mitigation measures identified through the EA process.

See “Government Regulation – Environmental Assessments” for more information.

In addition to the EA process, Denison will be required to obtain construction and operations permits from the Saskatchewan Ministry of Environment and licences from the CNSC. While some overlap between the EA process and licensing/permitting is possible, generally licensing and permitting is expected to be completed following the EA process.

Denison recognizes the importance of early engagement and has been developing relationships with key interested parties since 2016. Amongst Denison’s guiding principles is the utmost respect for Indigenous communities, Indigenous Rights, and traditional knowledge. Denison wishes to work in partnership to return meaningful benefits from the Wheeler River project to potentially impacted Rights holders, communities, and/or groups.

Denison understands the importance of protecting the area in which it is working, including the land, the water, the animals, the air and culture. Denison welcomes input from all interested parties through regulatory engagement and consultation. Processes have been established with and for interested parties to work directly with Denison to express comments (positive or negative) or recommendations regarding its activities so the input can be incorporated into project plans, designs, and decisions.

Since 2016, Denison has engaged with interested parties to develop meaningful relationships and facilitate a collaborative approach to engagement and the advancement of the Wheeler River Project. Denison has developed and implemented an engagement plan to guide and structure such engagement activities. Engagement activities for interested parties are tailored to comply with both federal and provincial regulatory legislation and, importantly, meet the expectations of the parties.

2024 ANNUAL INFORMATION FORM    47


To support its engagement and consultation activities for the Wheeler River project, Denison has developed practices to (1) ensure that employment opportunities are established for residents from the communities of interest; (2) procure goods and services from suppliers from the communities of interest and/or Indigenous-owned suppliers, to support continued exploration and evaluation activities; (3) support important community-led activities related to wellness and/or the preservation of traditional knowledge; and (4) solicit input through engagement and consultation activities into aspects of project designs (for example, selection of mining methods, access road routing, and selection of preferred treated water discharge locations).

While the engagement to date has focused on the Phoenix project, the activities are also generally relevant to the Gryphon project. Engagement to date has been extensive, and Denison’s approach with respect to consultation has been thorough and responsive to the requests of the public, Indigenous groups, and regulatory agencies.

See “Environmental, Health, Safety & Sustainability Matters” for further details.

Gryphon

A conceptual layout of the plan view of the Gryphon site surface facilities shows the relative scale and nominal footprint size of major infrastructure items, including shafts, ore stockpile, waste rock storage, backfill plant, water treatment plant, water treatment and management ponds, fuel and propane storage, explosive storage and operations centre. It is assumed the Phoenix camp will be used during Gryphon mine development and production.

Gryphon Indicative Site Plan

Graphic

Gryphon is approximately 3 km northwest of the Phoenix deposit. Access to the Gryphon site will be via a 2 km road extension from the Phoenix site development. It will also be accessible by the airstrip northeast of the Phoenix deposit. Production from the Gryphon site will be trucked to the existing McClean Lake mill to the northeast via existing Provincial Highway 914, including approximately 50 km of new road between the McArthur River mine and the Cigar Lake mine.

2024 ANNUAL INFORMATION FORM    48


Gryphon Permitting and Compliance Activities

Although the current EIS and licensing efforts are not focused on the Gryphon project, significant baseline information has been gathered through the EA programs completed on the Wheeler River property. It is likely that additional and confirmatory baseline data collection will be required to complete the environmental approval process for the Gryphon project. As a result of a change in Federal legislation in 2019, the Gryphon project will undergo an EA to meet the requirements of the Saskatchewan Environmental Assessment Act; however, no Federal EA will be required.

Based on the existing understanding of the proposed Gryphon project, there is no reason to assume the Gryphon project could not successfully complete an environmental assessment which could be acceptable to the federal and provincial regulatory regimes and the Gryphon project’s stakeholders.

Additional regulatory approvals will be similar to those of the Phoenix ISR operation, whereby a Provincial permit and a CNSC licence will be prerequisites ahead of Gryphon project construction and operation. When Gryphon moves forward, while consultation for Phoenix is relevant, consultation specific to Gryphon will be undertaken.

The decommissioning and reclamation plan for Gryphon will need to be reviewed and developed in more detail as the Gryphon project is advanced.

Phoenix Capital and Operating Costs and Economic Analysis

Capital Costs

The estimated initial capital cost of the Phoenix project is $419.4 million, expressed in first-quarter 2023 Canadian dollars. This estimate falls under the AACE International Recommended Practice No. 47R-11 Class 3 Classification Guideline, with an expected accuracy to be within -15%/+25% of the Phoenix project’s final cost, including contingency. The costs include construction of the initial ground freezing plant and wells, the first phase of production wells, and the ISR process plant and infrastructure required for first production.

Additional pre-commitment costs of $67.4 million are necessary to advance the Phoenix project definition for regulatory purposes, and specifically to support a Licence to Construct satisfying the Canadian Uranium Mines and Mills Regulations SOR/2000-206. Once a Licence to Construct has been obtained, the Phoenix project will be considered sufficiently de-risked to enable the final investment decision (“FID”). The pre-commitment work includes engineering advancement, additional testwork, early procurement items, grid power design and execution, and management of these activities. Some of this work is in progress.

Sustaining capital is estimated to be $234.1 million and considers expansion of the wellfield and ground freezing system, and development of the injection solution system as the wellfield advances, expansion of the gypsum storage pad and modification to the process plant to accommodate well remediation.

2024 ANNUAL INFORMATION FORM    49


Phoenix Initial Capital Cost Estimate

    

    

Cost 

Area

Description

($M)

Direct Cost

 

  

 

  

 

Mining

 

63.0

 

In-situ leach process plant

 

102.6

 

Surface facilities

 

14.7

 

Utilities

 

34.8

 

Electrical

 

19.1

 

Civil and earthworks

 

39.6

Total Direct Cost

 

 

273.8

Indirect Cost

 

  

 

  

 

Indirect costs

 

70.5

 

Owner’s costs

 

32.7

Total Indirect Cost

 

 

103.2

 

Contingency

 

42.6

Total Capital Costs

 

 

419.4

Note: Figures may not sum due to rounding.

Operating Costs

The operating costs over the Phoenix LOM are estimated at $478.1 million. Average operating costs are estimated at $8.51/lb U3O8 (US$6.28/lb U3O8) produced. Operating costs during the first five years of production are expected to be $6.64 (US$4.90) per pound U3O8, benefitting from increased scale of operations and higher concentrations of uranium contained in recovered UBS. During the remaining years of production, operating costs are expected to be $13.69 (US$10.10) per pound U3O8.

Phoenix Operating Costs

    

Total Cost 

    

Cost 

    

Percentage of Total

Cost Area

($M)

($/lb U3O8)

 (%)

Mining

 

44.4

 

0.79

 

9

Processing

 

294.8

 

5.25

 

62

Transport to converter

 

13.7

 

0.24

 

3

Site support / G&A

 

125.1

 

2.23

 

26

Total

 

478.1

 

8.51

 

100

Total US$

 

6.28

U3O8 Sales (Mlb)

 

  

 

56.2

 

  

Note: Figures may not sum due to rounding.

Economic Analysis

The financial evaluation of Phoenix generates positive before and after-tax results.

2024 ANNUAL INFORMATION FORM    50


Phoenix Summary of Economic Results

Description

    

Unit

    

Base Case1

Pre-Tax Valuation Indicators

Undiscounted Cash Flow

$

B

 

3.63

NPV @ 8%

$

B

 

2.34

IRR

%

105.9

After-Tax Valuation Indicators

Basic After-Tax2

 

  

Undiscounted Cash Flow

$

B

 

2.25

NPV @ 8%

$

B

 

1.43

IRR

%

82.3

Payback

Months

 

11

Adjusted After-Tax2

 

  

Undiscounted Cash Flow

$

B

 

2.41

NPV @ 8%

$

B

 

1.56

IRR

%

90.0

Payback

Months

 

10

Notes:

(1)Spot price forecast is based on composite midpoint scenario from UxC’s Q2 2023 Uranium Market Outlook and is stated in constant (not-inflated) dollars and a CA$/US$ exchange rate of 1.35.
(2)Basic after-tax valuation does not apply Denison’s estimated tax pool balances and is considered the base case for the economic analysis in the FS. The adjusted after-tax valuation applies the estimated tax pool balances.

The financial analysis was carried out using a discounted cash flow methodology. Net annual cash flows were estimated to project yearly cash inflows (or revenues) and subtract projected cash outflows (such as capital and operating costs, royalties, and taxes). These annual cash flows were assumed to occur at mid-year and were discounted back to the date of FID to proceed with construction. Discounted cash flows were totalled to determine the NPV of the Phoenix project at a discount rate of 8%.

The Phoenix project is most sensitive to fluctuations in the U3O8 price and feed grades, less sensitive to changes in capital costs, and least sensitive to changes in operating costs.

Gryphon Capital and Operating Costs and Economic Analysis

Capital Costs

The estimated initial capital cost for the Gryphon project is $737.4 million, expressed in third-quarter 2022 Canadian dollars. Costs developed from first principles in the 2018 study were escalated by 36% based on the Chemical Engineering Plant Cost Index for equipment and materials. Labour, subcontract, equipment rental and contractor indirect costs were escalated by 10%, and other materials were escalated by 20%.

This estimate falls under the AACE International Recommended Practice No. 47R-11 Class 4 Classification Guideline, with an expected accuracy to be within -15% to -30% and +20% to +50% of the Gryphon project’s final cost, including contingency. The costs include shaft construction, underground development and mobile equipment, and McClean Lake mill upgrades.

2024 ANNUAL INFORMATION FORM    51


Gryphon Initial Capital Cost Estimate

Cost

Area

    

Area Description

    

($M)

Direct Cost

 

Shafts

222.4

Surface facilities

63.0

Underground

63.9

Utilities

5.3

Electrical

5.4

Civil and earthworks

16.0

McClean Lake mill upgrade

67.9

Off-site infrastructure

43.7

Total Direct Cost

487.6

Indirect Cost

Indirect costs

76.5

Owner’s costs

25.6

Total Indirect Cost

102.1

Contingency

147.7

Total Capital Cost

737.4

Note: Figures may not sum due to rounding.

Additional pre-commitment costs of $56.5 million are estimated to be necessary to advance the Gryphon project definition for regulatory purposes, and specifically to support a licence to construct satisfying the Canadian Uranium Mines and Mills Regulations SOR/2000-206. Upon receipt of licence to construct, Gryphon will be considered de-risked sufficiently to enable the FID. The pre-commitment work includes a feasibility study, environmental assessment, engineering advancement, additional testwork, early procurement items, grid power design and execution, and management of these activities.

Sustaining capital is estimated to be $98.7 million and considers underground development, construction and equipment.

Operating Costs

The operating costs over the LOM is estimated at $843.2 million. Average operating costs are estimated at $17.27/lb U3O8 (US$12.75/lb U3O8) produced.

Gryphon Operating Costs

Total Cost

Cost

Cost Area

($M)

($/lb U3O8)

 

$/t Processed

Mining

334.3

6.85

265.85

McClean Lake mill

427.6

8.76

340.08

Transport to converter

12.9

0.27

10.30

Site Support / G&A

68.3

1.40

54.32

Total

843.2

17.27

670.55

Total US$

12.75

U3O8 Sales (Mlb)

48.8

Note: Figures may not sum due to rounding.

2024 ANNUAL INFORMATION FORM    52


Economic Analysis

The financial analysis was carried out using a discounted cash flow methodology. Net annual cash flows were estimated to project yearly cash inflows (or revenues) and subtract projected cash outflows (such as capital and operating costs, royalties, and taxes). These annual cash flows were assumed to occur at mid-year and were discounted back to the date of FID to proceed with construction. Discounted cash flows were totalled to determine the NPV of the Gryphon Project at a discount rate of 8%.

The financial evaluation of the Gryphon Project using the updated cost estimate generates positive before and after-tax results. The results show a base case after-tax NPV of $864.2 million at a 8% discount rate, an IRR of 37.6% and a payback period of 22 months.

The Gryphon Project is most sensitive to fluctuations in the U3O8 price and feed grades and less sensitive to changes in capital costs and least sensitive to changes in operating costs.

Current and Contemplated Exploration, Development, and Production Activities

Phoenix

The results of the Phoenix FS indicate that Denison’s proposed uranium project is technically feasible and economically viable under the assumptions presented in the Wheeler Report. The Phoenix FS is considered sufficiently reliable to guide Denison in a decision to advance to the next phase of project development through front-end engineering design and detailed design to advance Phoenix to a point where the project is de-risked sufficiently to enable the FID. This includes field and laboratory testing, front-end engineering and design, detailed design, and early commitments for long-lead items to enable design and planning.

Gryphon

Pursuant to the Wheeler Report, the qualified persons who have reviewed Gryphon have set out a recommended program to prepare the Gryphon project to be advanced to the feasibility study stage of analysis. This includes infill and delineation drilling to advance the understanding of geology, mineralization controls and mineral resource for the Gryphon deposit, further metallurgical test work to further validate the performance of processing Gryphon ore at the McClean Lake mill, geotechnical requirements and recommendations for further advancement of Gryphon in subsequent stages, feasibility hydrogeological testing at Gryphon, and the collection of additional environmental baseline information.

2024 ANNUAL INFORMATION FORM    53


Other Exploration & Evaluation Projects

Athabasca Basin Projects Overview

Denison’s Athabasca projects range in exploration maturity and present numerous exploration opportunities. Denison continuously reviews its significant land package with a view to generating new exploration targets or creating spin-out opportunities. The table below provides a list of Denison’s other directly owned Athabasca projects as at the date hereof.

    

Denison 

    

    

    

Projects

Ownership

JV Partner

# Claims

Hectares

Bachman Lake

100

%

5

11,419

Bell Lake

 

100

%

 

5

19,069

Blackwing

 

80

%

Foremost(2)

 

3

 

12,627

Brown Lake

 

100

%

 

3

1,755

Candle Lake

 

75.18

%(1)

JCU

 

1

 

2,595

CLK

 

80

%

Foremost(2)

 

2

 

10,422

Crawford Lake

 

100

%

 

5

11,800

Darby

 

30

%

Cosa

 

12

 

18,069

Epp Lake

 

80

%

Foremost(2)

 

2

 

865

Ford Lake

 

100

%

 

5

9,649

GR

 

80

%

Foremost(2)

 

16

 

78,585

Hatchet Lake

 

56.12

%

Foremost(2), Eros Resources Corp.

 

9

 

10,212

Hook-Carter

 

80

%

ALX Uranium Corp.

 

11

 

25,115

Johnston Lake

 

100

%

 

9

 

28,647

Lynx Lake

 

100

%

 

1

 

1,274

Mann Lake

 

30

%

Cameco, Orano Canada

 

2

 

3,407

Marten

 

80

%

Foremost(2)

 

2

 

5,008

McClean Lake

 

22.50

%

 

17

(3)

4,258

Midwest

 

25.17

%

 

3

 

1,426

Moon Lake

 

100

%

 

2

 

4,309

Moon Lake North

 

100

%

 

10

 

1,068

Moon Lake South

 

75

%

 

1

 

2,716

Murphy Lake North

 

30

%

Cosa

 

2

 

1,532

Murphy Lake South

 

80

%

Foremost(2)

 

6

 

7,154

Packrat

 

30

%

Cosa

 

1

 

1,621

Park Creek

 

49

%

Cameco

 

8

 

7,798

Russell Lake

 

37.82

%

Cameco, Waldimer Boyko

 

1

 

355

Torwalt Lake

 

80

%

Foremost(2)

 

1

 

812

Turkey Lake

 

80

%

Foremost(2)

 

1

 

3,789

Waterbury Lake

 

70.55

%

KWULP

 

13

 

40,256

Waterfound

 

11.78

%(1)

Orano, JCU

 

25

 

11,670

Waterfound North

 

100

%

 

4

 

4,124

Wolly

 

20.77

%(1)

Orano, JCU

 

17

 

23,700

Wolverine

 

80

%

Foremost(2)

 

3

 

5,036

TOTAL:

 

  

 

 

208

 

372,142

Notes:

(1)Denison also owns an additional indirect interest, through its 50% ownership of JCU. See table below.
(2)Foremost has an option to earn up to 70% of Denison’s interest, pursuant to the Foremost Transaction, and has earned an initial 20% interest. If the earn-in is completed, the parties will establish a joint venture for each property.
(3)The mineral property consists of 4 mineral leases covering an area of 1,147 hectares and 13 mineral claims covering an area of 3,111 hectares.

2024 ANNUAL INFORMATION FORM    54


Denison is indirectly involved in eleven uranium projects located in the Athabasca Basin of Saskatchewan through its 50% ownership of JCU. The table below provides a list of JCU’s Athabasca Basin project interests at December 31, 2024.

Projects

    

JCU Ownership

    

JV Partner(1)

Beatty River

 

21.4253

%  

Orano Canada; UEX

Candle Lake

 

24.82

%  

Denison

Christie Lake

 

34.4508

%  

UEX

Close Lake

 

10.3128

%  

Orano Canada; Cameco

Cree Extension

 

30.0990

%  

Cameco; Orano Canada

Millennium

 

30.0990

%  

Cameco

Moon Lake(2)

 

20.1494

%  

Cameco; Orano Canada

Moore Tomblin

 

13.5947

%  

Orano Canada; Cameco

Waterfound

 

25.801

%  

Orano Canada; Denison

Wheeler River

 

10

%  

Denison

Wolly

 

12.4335

%  

Orano Canada; Denison

Notes:

(1)The first company listed is the project operator.
(2)This property shares a name with, but is distinct from, Denison’s Moon Lake property listed in the prior table.

Non-Athabasca Basin Projects Overview

Denison has the following interests in non-Athabascan and/or non-uranium projects:

Projects

    

Ownership

    

JV Partners1

Kiggavik Uranium Project

 

33.8118

%2

Orano Canada; JCU; Urangesellschaft Canada Ltd.

Kindersley Lithium Project

 

n/a3

 

Denison; Grounded Lithium

Notes:

(1)The first company listed is the project operator.
(2)Denison’s interest in this project is held indirectly through its 50% ownership of JCU.
(3)Denison and Grounded Lithium are parties to an earn-in agreement pursuant to which Denison can earn up to a 75% interest in the KLP.

Waterbury Lake 2024 Activities

The Waterbury Lake property interests are owned by the WLULP, which is a partnership between Denison (70.53%) and KWULP (29.45%), as limited partners, and WLUC (0.02%), as general partner. Denison holds a 60% interest in WLUC (KWULP, 40%) and, in aggregate, holds a 70.55% interest in the WLULP through its limited partner and general partner ownership interests (KWULP, 29.45%). Denison is the operator of the project.

The Waterbury Lake property is located within the eastern part of the Athabasca Basin in Northern Saskatchewan, which is within Treaty 10, in Nuhenéné / Athabasca Denesųłiné territory, and within the homeland of the Métis.

The Waterbury Lake project, as of December 31, 2024, is comprised of thirteen (13) mineral dispositions covering 40,256 ha and contains two deposits: the THT deposit and Huskie deposit. The deposits are located within the property near its eastern edge. All dispositions have sufficient approved assessment credits to maintain the ground in good standing until at least 2033.

In November 2020, Denison completed a preliminary economic assessment for the project (the “2020 PEA”), as summarized and reported in the technical report entitled “Preliminary Economic Assessment for the Tthe Heldeth Túé (J Zone) Deposit, Waterbury Lake Property, Northern Saskatchewan, Canada” effective October 30, 2020 (the “Waterbury Report”).

2024 ANNUAL INFORMATION FORM    55


The Waterbury Report, completed in accordance with NI 43-101 and filed on December 30, 2020, evaluates a THT ISR operation estimated to produce total mine production of 9.7 million pounds of U3O8 (177,664 tonnes at 2.49% U3O8) over an approximate six year mine-life with final processing occurring at Denison’s 22.5% owned McClean Lake mill with a base case pre-tax NPV of $177 million (8% discount rate), IRR of 39.1%, and initial capital expenditures of $111.6 million, excluding pre-construction evaluation and development costs. The base-case economic analysis assumes uranium sales are made at UxC’s forecasted annual “Composite Midpoint” spot price from the Q3 2020 Uranium Market Outlook, stated in constant dollars (from ~US$49/lb U3O8 to US$57/lb U3O8). The Waterbury PEA was prepared on a project (100% ownership) and pre-tax basis, as each WLULP partner is subject to different tax and other obligations.

The PEA is a preliminary analysis of the potential viability of the project’s mineral resources and should not be considered the same as a Pre-Feasibility or Feasibility Study, as various factors are preliminary in nature. There is no certainty that the results from the PEA will be realized. Mineral resources are not mineral reserves and do not have demonstrated economic viability.

Through a field program conducted in 2023 at THT, Denison (i) validated hydraulic conductivity in 100% of the test wells within the ore zone and achieved hydraulic conductivity values consistent with the 2020 PEA; (ii) the established a 10-hour breakthrough time with an ion tracer test, demonstrating the ability to maintain hydraulic control of injected solutions and achieve breakthrough times consistent with expectations; and (iii) demonstrated the effectiveness of permeability enhancement.

In 2024, Denison continued its evaluation work, building on the 2020 PEA and 2023 field programs. Such work included the completion of: (1) metallurgical test work with core retrieved during the 2023 field program, (2) additional pump and injection tests from the ISR test wells installed in 2023 to validate year-over-year hydrogeological test results, (3) the collection of key components of environmental baseline data. Denison also advanced updates to engineering design activities and assessments.

The 2024 field test program was completed in the third quarter of 2024. During the program, two small-diameter test wells, installed in the THT east pod as part of the 2023 drill program, were re-entered. The wells were retrofitted to their target depths and outfitted with well screens and/or pressure monitoring devices, as applicable, in order to facilitate additional hydrogeological and geophysical testing. Additionally, core samples were retrieved from the site for extensive density analysis, which will inform a planned update to the mineral resource estimate.

During the fourth quarter of 2024, metallurgical test work continued to advance, including the completion of a core leach and remediation test and post-leach characterization and recovery reconciliation. THT column leach and remediation test work was also completed and will be incorporated into a potential future PFS. All metallurgical test work was conducted at SRC facilities in Saskatoon. Mineral resource modelling is also ongoing, incorporating results of the 2023 and 2024 field programs.

The results of the metallurgical test work, the ISR field program, mineral resource modelling, and the engineering studies and assessments are expected to support the completion of a potential future PFS.

In addition, to support future potential regulatory / permitting processes for THT, engagement activities were undertaken in June 2024 in the Athabasca Basin region of northern Saskatchewan in collaboration with the YNLRO.

McClean Lake 2024 Exploration & Evaluation Activities

The McClean Lake project is owned by Denison (22.5%) and Orano Canada (77.5%). Orano Canada is the operator/manager of the projects.

The McClean Lake property is located within the eastern part of the Athabasca Basin in northern Saskatchewan, approximately 26 kilometres west of the Rabbit Lake mine and approximately 750 kilometres north of Saskatoon. Access to the McClean Lake site is by both road and air. Goods are transported to the site by truck over an all-weather road connecting with the provincial highway system. Air transportation is provided through the Points North airstrip, located approximately 25 kilometres from the project site.

2024 ANNUAL INFORMATION FORM    56


The mineral property consists of four mineral leases covering an area of 1,147 hectares and 13 mineral claims covering an area of 3,111 hectares. The right to mine the McClean Lake deposits was acquired under these mineral leases, as renewed from time to time. Mineral leases are for terms of 10 years with the right to renew for successive 10-year periods, provided that the leaseholders are not in default of the terms of the lease. A mineral claim grants the holder the right to explore for minerals within the claim lands and the right to apply for a mineral lease. The current mineral leases have terms that expire between November 2025 and August 2026 and title to the mineral claims is secure until at least 2041. It is expected that the leases will be renewed in the normal course, as required, to enable all the McClean Lake deposits to be fully exploited.

The right to use and occupy the lands at McClean Lake has been granted in a surface lease agreement with the province of Saskatchewan. The McClean surface lease was entered into in 2002, has a term until 2035 (33 years), and covers a land area of approximately 3,677 hectares.

McClean Lake consists of nine known ore deposits: JEB; Sue A, B, C, D and E; McClean North; McClean South; and Sue F (formerly referred to as Caribou). In 1995, the development of the McClean Lake project began. Mill construction commenced in 1995 and ore processing activities reached commercial production in November 1999. Mining operations also commenced, and the following deposits have been mined out to date: JEB (1996 to 1997), Sue C (1997 to 2002), Sue A (2005 to 2006), Sue E (2005 to 2008) and Sue B (2007 to 2008). The remaining ore reserves consist of a limited quantity of stockpiled ore from historical Sue B open pit mining operations and SABRE test mining activities at McClean North. Approximately 87,454 tonnes of Sue B ore at a grade of 0.35% U3O8 and 2,839 tonnes of McClean Lake North ore (mined via SABRE, as defined below), at an average grade of 0.80% U3O8, are stockpiled on surface.

No exploration program was conducted in 2023 or 2024.

Since 2006, various test mining programs have also been conducted at McClean North. In 2023, Denison and Orano Canada approved a restart of uranium mining operations using the joint venture’s patented SABRE mining method. Mining is planned to commence at the McClean North deposit in 2025, with 2024 activities focused on preparations necessary to ready the existing SABRE mining site and equipment for continuous commercial operations, as well as the installation of pilot holes for the first mining cavities planned for excavation. See “Denison Operations- SABRE Mining Program” for more information.

Midwest 2024 Activities

The MWJV is operated by Orano Canada and is host to the high-grade Midwest Main and Midwest A uranium deposits, which lie along strike and within six kilometres of the THT and Huskie deposits at Waterbury Lake. The Midwest and Waterbury deposits are all located in close proximity to existing uranium mining and milling infrastructure, including provincial highways, powerlines, and Denison’s 22.50% owned McClean Lake mill.

A Concept Study evaluating the potential application of the ISR mining method at Midwest was prepared by Denison in 2022 and was formally issued to the MWJV in early 2023. Based on the positive results of the Concept Study, the MWJV provided Denison with approval to complete additional ISR-related evaluation work for Midwest.

In 2024, the evaluation plans for Midwest were designed to include an inaugural ISR field test program, intended to validate various characteristics of the Midwest Main deposit, and to collect a database of geotechnical, hydrogeological, and metallurgical data to further evaluate the ISR mining conditions present at the Midwest Main deposit.

The ISR field test program was completed in the second quarter of 2024. Ten small-diameter test wells were installed within the Midwest Main deposit – including a four-well test pattern and six individual wells to test specific areas of the deposit for various characteristics. The test pattern included one injection well, one extraction well, a recharge well, and a monitoring well outfitted with a multi-channel vibrating wire piezometer. The six additional wells were drilled to their target depths and, as applicable, outfitted with well screens and/or pressure monitoring devices to facilitate broader hydrogeological testing. All wells were decommissioned at the conclusion of the program, consistent with regulatory commitments.

Highlights from the program:

Confirmed Hydraulic Conductivity: Pump and injection tests validated hydraulic connectivity in the test wells within the mineralized zone and achieved hydraulic conductivity values (a measure of permeability) consistent with the

2024 ANNUAL INFORMATION FORM    57


Concept Study. Sufficient permeability within the mineralized zone is a key criterion for the successful deployment of the ISR mining method.
Demonstrated the Effectiveness of Permeability Enhancement: One method of permeability enhancement was successfully deployed within two wells, demonstrating the suitability of the method to the Midwest Main deposit. The efficiency of permeability enhancement was verified by comparison of pre- and post-permeability enhancement hydraulic testing.
Metallurgical Samples Defined and Collected for Leaching Characteristics: Core samples representative of the Midwest deposit were collected during the program for use in future metallurgical tests to determine the leaching characteristics.

The field program results, along with further technical studies, are expected to be used to advance the de-risking of the ISR mining requirements to further the evaluation of the ISR mining method for the property, the results of which are anticipated to be summarized through the preparation of a PEA for the Midwest project.

Additionally, analysis of core collected during the drilling program successfully confirmed the location and grade of mineralization within the Midwest Main deposit. The results are expected to be used to update the mineral resource estimate and provide a basis for future evaluations of mineral extraction by both ISR and the SABRE mining method. Certain core samples are also being analyzed to support future mineral processing assessments.

For 2025, the MWJV has approved a program and budget for an assessment of the application of the SABRE mining method, site engineering, road design; a mill debottlenecking study to examine the possibility of increasing the McClean Lake mill capacity through mill upgrades; environmental studies and EA updates; and an ISR de-risking program comprised of field work, metallurgical studies, and engineering studies, that could support the completion of a future PFS.

2024 Exploration Project Portfolio Activities

The following table summarizes the exploration activities completed at Denison’s exploration portfolio properties in 2024.

EXPLORATION ACTIVITIES

Property

Denison’s ownership(1)

Drilling in metres (m)(2)

Other activities

Crawford Lake

 

100.00

%  

3,334 (8 holes)

 

Geophysical Survey

Hatchet Lake

 

56.12

%  

884 (4 holes)

 

Johnston Lake

    

100.00

%  

6,228 (8 holes)

    

Geophysical Survey

Moon Lake South

 

75.00

%  

7,179 (11 holes)

 

Geophysical Survey

Waterfound

 

24.68

%  

8,652 (14 holes)

 

Geophysical Survey

Total

 

  

 

26,277 (45 holes)

 

  

(1)Denison’s effective ownership interest as at December 31, 2024, including indirect ownership interests held through Denison’s 50% ownership of JCU.
(2)The Company reports total exploration metres drilled and the number of holes that were successfully completed to their target depth.

For 2025, Denison plans to continue efforts to refill and re-evaluate the target inventory within Denison’s exploration project portfolio, including geophysical programs proposed along the CR-3 conductor trend on Moon Lake South and the adjacent Crawford Lake project. Additional geophysical surveying is also planned for the Johnston Lake project to replenish the target inventory for future drill programs.

2024 ANNUAL INFORMATION FORM    58


Athabasca Exploration: Sampling, Analysis and Data Verification

Unless otherwise specifically disclosed herein, the following describes the procedures and protocols for Wheeler River programs operated by Denison in reference to drill hole surveying, downhole radiometric surveying, core logging, core sampling, sample preparation methods, analytical procedures, Quality Assurance and Quality Control (“QAQC”) and data verification.

Drill Hole Surveying

Drill collars are typically sited and surveyed in the field using a Differential Global Positioning System (“DGPS”) to determine accurate coordinates and elevation. The drill rig azimuth and dip are aligned using a field compass (set to the appropriate magnetic declination) or a rig alignment tool. The trajectory of all drill holes is determined with a Reflex survey instrument in single-shot mode, which measures the azimuth and inclination of the drill hole. Measurements are collected at approximately 50 metre intervals down the hole.

Downhole Radiometric Probe Surveying

When possible, all drill holes are surveyed immediately after drilling with a downhole radiometric probe to measure natural gamma radiation. Each survey consists of either an HPL2375 single sodium iodide (NaI) scintillation crystal tool or a 2GHF-1000 triple gamma tool (one sodium iodide crystal and two ZP1320 high flux Geiger-Mueller (“GM”) tubes) attached to an MX-Series winch with an MGX data recorder connected to a portable computer.

Downhole logging measurements are completed within the drill rods for both down and up survey runs using MSLog software provided by Mt Sopris. Logging speeds are maintained at approximately 10 metres/minute. Individual data recordings are stored separately for each run on a portable laptop computer.

Total count measurements from each survey are converted to radiometric equivalent grade U3O8 % (“eU3O8”) values using conversion coefficients derived from calibration facilities at the SRC test pits located in Saskatoon, Saskatchewan. The calibration facilities allow for regular checks on both probes and probing equipment and to monitor or identify maintenance issues before field operations begin. The site consists of four mineralized holes, with isolated uranium concentrations of 1.4, 1.6, 1.6 and 0.21 metres wide with U grades varying from 0.063, 0.29, 1.25 and 4.07%, respectively. Individual probes are calibrated using the NaI crystal measurements a minimum of two times per year, normally before and after the winter and summer field seasons. Survey results are also corrected for attenuation of signal in water and for the thickness of steel pipe in the hole. GM tubes are checked for drift at the site; however, calibration factors for these probes were derived separately using direct comparisons of total count values with assay core results as high as 80% U3O8. The “in-situ” nature of this calibration procedure allows for a wider spectrum of predicted results than using the SRC calibration facilities.

A deposit-specific radiometric-grade correlation has been developed for the Company’s Phoenix deposit, where the gamma signature obtained from the high flux GM tubes of the triple gamma probe can be used to estimate in-situ uranium grade. The radiometric-grade correlation was developed by an independent 3rd party by comparing geochemical sample assays collected from the Phoenix deposit to their corresponding probe data. Only intervals with high core recovery were selected for the correlation process to ensure a representative comparison between the data sets. Raw gamma probe data is first converted to adjusted counts per second (cps) by correcting raw gamma counts per second for fluid absorption, casing absorption, and dead-time. Adjusted cps are then calibrated into an equivalent grade based on the correlation between the grade-thickness product of the adjusted cps and assay data from representative mineralized intercepts. A total of 50 mineralized intercepts were used to develop the radiometric-grade correlation for Phoenix.

The Company typically reports eU3O8, derived from a calibrated downhole total gamma probe, as preliminary during its exploration programs and subsequently reports definitive assay grades following sampling and chemical analysis of the mineralized drill core.

2024 ANNUAL INFORMATION FORM    59


Core Logging

Denison employs suitably qualified persons to log all drill core in detail at dedicated, custom-built core logging facilities proximal to drilling operations. Routine logs completed for each drill hole include lithology, sandstone texture, paleoweathering, mineralization, alteration, structure (interval and point), geotechnical, and gamma (handheld scintillometer). Where deemed necessary, additional logs may be collected to assist in constraining geophysical survey results. These logs may include magnetic susceptibility or other physical property measurements. For advanced projects where mining studies may be applicable, geotechnical logs are expanded and may also include point load testing. All logging data, together with collar and survey information and a drill hole summary, are uploaded to a DHLogger database with central storage on Denison’s server at the Saskatoon office. In addition, the drill core is photographed, both wet and dry, before it is stored at project sites either in racks or as cross-stacks. Drill core handling and sampling protocols are in accordance with industry best practices.

Core Sampling, Sample Preparation and Assaying

Assay Samples

Denison has routinely used SRC Geoanalytical Laboratories (“SRC Geoanalytical”) in Saskatoon, Saskatchewan for their geochemical analyses. Check assays are sent to SRC’s Delayed Neutron Counting laboratory (“SRC DNC”). SRC Geoanalytical’s management system operates in accordance with ISO/IEC 17025:2017 (CAN-P-4E), General Requirements for the Competence of Mineral Testing and Calibration Laboratories, is compliant with CAN-P-1579 Guidelines for Mineral Analysis Testing Laboratories and is also accredited ISO/IEC 17025:2005 for the analysis of U3O8. SRC DNC follows ISO/IES17025:2017. SRC and its affiliated laboratories are independent of Denison.

Denison submits drill core samples for chemical U3O8 assay for all mineralized intervals, where core recovery permits. Mineralized intervals are identified by handheld scintillometer and confirmed by downhole gamma probe logs. All mineralized core is broken into approximately 10-centimetre pieces and measured with a handheld scintillometer (RS-120 or RS-125) by removing each piece of drill core from the ambient background, noting the most pertinent reproducible result in counts per second (“cps”), and carefully returning it to its correct place in the core box. Any core registering over 500 cps is marked for sampling, typically over 50-centimetre intervals. A threshold of 300 cps has been used at Wheeler River’s Gryphon deposit since the beginning of 2017. Additional non-mineralized ‘shoulder’ samples are marked over 50-centimetre intervals to flank both ends of the mineralized intervals. In areas of strong mineralization, more than one sample on either end is sometimes required. All core samples are split in half with a hand splitter according to the sample intervals marked on the core. One-half of the core is returned to the core box for future reference, and the other half is tagged and sealed in a plastic bag. Bags containing mineralized samples are sealed for shipping in metal or plastic pails, depending on the radioactivity level.

Because the mineralized drill cores are classified as hazardous materials and are regulated under requirements governing the transport of dangerous goods, Denison staff have been trained in the proper handling and transport of the cores and deliver them from the core facility directly to the laboratory without outside contact.

The assay sample preparation and analytical procedures are as follows:

Drill core samples are received by the analytical laboratory from Denison in sealed five-gallon plastic or metal pails. Each sample is contained in a sealed plastic bag with a sample tag. A packing slip that contains instructions and a sample number list is enclosed. Samples are verified against the packing slip. Any extra samples or missing samples are noted, and Denison is informed.
Samples are sorted and processed according to lithology (sandstone or basement) and level of radioactivity.
Sample preparation includes drying, jaw crushing to 60% passing -2 millimetres, and pulverizing to 90% passing -106 microns.
The resultant pulp is split and digested using a two-acid partial digest (HNO3:HCl) and a three-acid ‘total’ digest (HF: HNO3:HClO4), and the respective solutions analyzed for multi-elements, including uranium, using ICP-OES (SRC analytical method ICP1). Boron values are obtained through NaO2/NaCO3 fusion followed by ICP-OES.

2024 ANNUAL INFORMATION FORM    60


When uranium partial values, as obtained above, are ≥1,000 ppm, sample pulps are re-assayed for U3O8 using SRC’s ISO/IEC 17025:2005 accredited method for the determination of U3O8 wt%. A split of the sample pulp is digested using aqua-regia (HCl:HNO3 in the ratio 3:1), and the solution is analyzed for U3O8 wt% using ICP-OES.

Bulk Dry Density Sampling

Samples are routinely collected from mineralized intersections for bulk dry density determination as required for mineral resource estimation. Density samples are typically collected at a frequency of one density sample per 10 assay samples, also ensuring the density samples are representative of the uranium grade range and the different domains of the deposit. The density samples comprise half-split core over 10-centimeter intervals, and for each sample, the depth, rock type, and scintillometer reading are recorded. Density samples are sent to SRC for analysis, along with the mineralized core samples for assay. At SRC, the density samples are first weighed as received and then submerged in de-ionized water and re-weighed. The samples are then dried until a constant weight is obtained. The sample is then coated with an impermeable layer of wax and weighed again while submersed in de-ionized water. Weights are entered into a database and the bulk density of each sample is calculated. Water temperature at the time of weighing was also recorded and used in the bulk density calculation. Following bulk density determination, the samples are sent for uranium assay using SRC’s ISO/IEC 17025:2005 accredited method for the determination of U3O8 wt% in order to ensure a direct correlation can be made between density and assay values.

Permeameter Analysis

Denison has performed onsite permeameter analyses since 2019 using a portable gas probe permeameter where the permeability of the rock matrix is measured from the pressure decay rate of nitrogen gas. Prior to 2021, QA/QC checks were performed by the University of Kyoto, Japan, using a pressure decay permeameter and a TEMCO model MP-401 steady-flow gas permeameter. Results were consistent between the datasets. Samples were also sent to SNC Lavalin Geoscience and Materials laboratory in Saskatoon for permeability analysis using water, the results of which were within one order of magnitude of pressure decay tests.

Since 2021, Denison has introduced QA tests before every set of permeameter tests based on the laboratory tests performed in previous years. A blank metal plate is measured as a leak check, and two reference materials are measured to ensure accuracy. The probe’s lower permeability detection limit is 10 -13 m/s.

Exploration Samples

Three other types of drill core samples are collected during routine exploration, the results of which are used to prioritize drill holes for follow-up exploration or determine geochemical and/or alteration vectors toward mineralization, as follows:

1.Composite geochemical samples are collected over approximately 10-metre intervals in the upper Athabasca sandstone and in fresh lithologies beneath the unconformity (basement) and over 5-metre intervals in the basal sandstone and altered basement units. The samples consist of 1 to 2 centimetre thick disks of core collected from the top or bottom of each row of core in the box over the specified interval. Care is taken not to cross lithological contacts or stratigraphic boundaries. These samples are submitted to SRC for sample preparation and multi-element analysis. The same sample preparation procedures are used as described above for U3O8 assay samples. The pulps are analyzed using the ICPMS Exploration Package, which includes a total digest (HF:HNO3:HCIO4) and partial digest (HNO3:HCl) followed by ICP-MS analysis. Boron values are obtained through NaO2/NaCO3 fusion followed by ICP-OES.
2.Representative/systematic core disks (one to five centimetres in width) are collected at regular 5 to 10-metre intervals throughout the entire length of core until basement lithologies become unaltered. These samples are analyzed for clay minerals using reflectance spectroscopy. Samples for reflectance clay analyses are analyzed by Denison using an ArcSpectro FT-NIR ROCKET spectrometer and sent to AusSpec International Ltd. for interpretation.

2024 ANNUAL INFORMATION FORM    61


3.Select spot samples are collected from significant geological features (i.e. radiometric anomalies, structure, alteration etc.). Core disks ranging from 1 to 2 centimetres thick are collected for reflectance spectroscopy, while split core samples are collected for geochemical analysis. The same reflectance spectrometry or geochemical procedures as described above are used.

These sampling types and approaches are typical of uranium exploration and definition drilling programs in the Athabasca Basin.

Data Handling

After the analyses are completed, analytical data are securely sent using electronic transmission of the results by SRC to Denison. The electronic results are secured using WINZIP encryption and password protection. These results are provided as a series of Adobe PDF files containing the official analytical results (“assay certificates”) and a Microsoft Excel spreadsheet file containing only the analytical results. Analytical data received from the lab is imported directly into Denison’s DH Logger database. The data is subject to validation using triggers built into the database to identify blank or standard assays that fall outside the accepted limits that require re-analysis. Field duplicates are validated using control charts. The laboratory is immediately notified of any problematic samples or batches, which are subsequently re-analyzed. The lab reports assay values that fall below the method detection limit (“MDL”) as ‘less than’ values (<MDL). These values are automatically replaced with a value of half the MDL by the database during import. The database is backed up on- and off-site every day.

QAQC

SRC has an internal QAQC program dedicated to the active evaluation and continual improvement of the internal quality management system. The laboratory is accredited by the Standards Council of Canada as an ISO/IEC 17025 Laboratory for Mineral Analysis Testing and is also accredited ISO/IEC 17025:2005 for the analysis of U3O8. The laboratory is licensed by the CNSC for the possession, transfer, import, export, use, and storage of designated nuclear substances by CNSC Licence Number 01784-5-24.7. As such, the laboratory is closely monitored and inspected by the CNSC for compliance. All analyses are conducted by SRC, which has specialized in the field of uranium research and analysis for over 30 years. SRC is an independent laboratory, and no associate, employee, officer, or director of Denison is, or ever has been, involved in any aspect of sample preparation or analysis on samples. SRC uses a Laboratory Management System (“LMS”) for Quality Assurance. The LMS operates in accordance with ISO/IEC 17025:2005 (CAN-P-4E) “General Requirements for the Competence of Mineral Testing and Calibration Laboratories” and is also compliant with CAN-P-1579 “Guidelines for Mineral Analysis Testing Laboratories”. The laboratory continues to participate in proficiency testing programs organized by CANMET (CCRMP/PTP-MAL).

SRC routinely inserts standard reference materials and blanks into batches of the Company’s samples as an internal check on accuracy and contamination. Quality control samples (reference materials, blanks, and duplicates) are included with each analytical run based on the rack sizes associated with the method. Before the results leave the laboratory, the standards, blanks, and split replicates are checked for accuracy and issued, provided the senior scientist is fully satisfied. If, for any reason, there is a failure in an analysis, the sub-group affected will be re-analyzed and checked again. A Corrective Action Report will be issued, and the problem will be investigated fully to ensure that any measures to prevent the re-occurrence can and will be taken. All human and analytical errors are, where possible, eliminated. If the laboratory suspects any bias, the samples are re-analyzed, and corrective measures are taken.

Denison has developed several QAQC procedures and protocols to monitor laboratory performance, as follows:

Uranium Standards - Due to the radioactive nature of the standard material, insertion of the standard materials is preferable at SRC instead of in the field. During sample processing, the appropriate standard grade is determined, and an aliquot of the appropriate standard is inserted into the analytical stream for each batch of materials assayed. Uranium standards are typically inserted at a minimum rate of 1 in every 40 samples. For the Wheeler River project up until the end of 2018, Denison used standards provided by Joint Venture partner Cameco for uranium assays. Six Cameco uranium assay standards were prepared for use in monitoring the accuracy of uranium assays received from the laboratory. For Wheeler River from 2019 onward, a suitable matrix-matched Certified Reference Material (“CRM”) is used as a standard.

2024 ANNUAL INFORMATION FORM    62


Blanks - Denison employs a lithological blank composed of quartzite to monitor the potential for contamination during sampling, processing, and analysis. The selected blank consists of material that contains lower U3O8 content than the sample material but is still above the detection limit of the analytical process. Due to the sorting of the samples submitted for assay by SRC based on radioactivity, the blanks must be inserted by SRC after this sorting takes place to ensure that these materials are ubiquitous throughout the range of analytical grades. If the individual geologists were to submit these samples anonymously, they would invariably be relegated to the minimum radioactive grade level, preventing their inclusion in the higher radioactive grade analyses performed by SRC. Blanks are typically inserted at a minimum rate of 1 in every 40 samples. For the Wheeler River project up until the end of 2018, Denison used blanks provided by Joint Venture partner Cameco. For Wheeler River from 2019 onward, another suitable blank material is used, as provided by SRC.

Field Duplicates - The Company inserts duplicate samples in the sample stream as a check on the precision of SRC. Core duplicates are prepared by collecting a second sample from the same interval by splitting the original sample into two, with each half of the sample material submitted as an independent sample. Duplicates are typically submitted at a minimum rate of one per 25 samples. The collection may be further tailored to reflect field variation in specific rock types or horizons.

Exploration Standards - Denison has prepared in-house ‘exploration standards’ to independently monitor laboratory performance during the processing of routine drill core exploration samples. These standards aim to test laboratory accuracy and precision for a variety of trace metals at low levels, as required for Athabasca uranium exploration.

Assay Checks - In addition to the QAQC described above, up until the end of 2018, Denison sent one in every 25 U3O8 assay samples to SRC’s Delayed Neutron Counting laboratory, a separate umpire facility located at SRC in Saskatoon to compare the uranium values using two different methods, by two separate laboratories. After 2019, assay samples were sent to the SRC’s X-ray fluorescence (“XRF”) lab for umpire analyses. All radioactive samples are monitored and recorded as per CNSC licence 01784-5-24.7. Furthermore, downhole radiometric probe results provide eU3O8 data, which the Company uses for comparisons with SRC U3O8 results.

Data Verification

Denison engages with independent consultants for estimation of mineral resources on its mineral properties, in accordance with CIM Standards and NI 43-101, as well as other studies, including the 2018 PFS and ISR field testing and engineering studies. In this regard, the independent consultants undertake rigorous data verification, including, but not limited to, Denison’s field procedures, databases and assay results.

Prior to public disclosure of drilling results, including preliminary radiometric (eU3O8) and chemical assay grades (U3O8), the results are subject to data verification by Qualified Persons employed by Denison. This includes checks of 10 to 20% of the results (typically as composited intervals) against non-composited eU3O8 determinations and laboratory assay certificates.

2024 ANNUAL INFORMATION FORM    63


Denison’s Operations

McClean Lake Mill & Cigar Lake Toll Milling

The MLJV owns a state-of-the-art uranium processing facility located on the eastern edge of the Athabasca Basin in northern Saskatchewan, approximately 750 kilometres north of Saskatoon. Orano Canada is the operator/manager of the facility.

The McClean Lake mill is specially designed and constructed to process high grade uranium ores in a safe and environmentally responsible manner. The mill uses sulphuric acid and hydrogen peroxide leaching and a solvent extraction recovery process to extract and recover the uranium product from the ore. In addition to the mill facility, other infrastructure on the site includes a sulphuric acid plant, a ferric sulphate plant, an oxygen plant, an electricity transmission line tied into the provincial power grid, a 14 megawatt back-up diesel power plant, warehouses, shops, offices and living accommodations for site personnel.

In 2016, an expansion of the mill was completed and an increase to the licensed capacity of the mill was approved – resulting in an increase to the licensed production capacity of the mill to 24 million pounds U3O8 per year. This increased licensed capacity allowed for the processing of 100% of ore production from the Cigar Lake mine, up to 18 million pounds U3O8 per year, and provides the flexibility for the mill to process ore from other sources in the future.

Operations

The table below shows the operating statistics for McClean Lake milling operations over the last five years.

McClean Lake Operations

    

2024

    

2023

    

2022

    

2021

    

2020

Ore Milled (thousand tonnes)

 

58,226

 

51,866

 

54,301

 

35,409

 

27,773

Total MLJV Production (thousand pounds U3O8)

 

 

 

 

176

 

Denison’s share MLJV Production (thousand pounds U3O8)

 

 

 

 

40

 

Toll Mill Production (thousand pounds U3O8)

 

16,930

 

15,098

 

18,010

 

12,335

 

10,069

Mill Licence

The McClean Lake site is operated under various permits, licences, leases and claims granted and renewed from time to time, all of which are currently in good standing. In 2016, the CNSC authorized an increase in the mill’s licensed annual production from 13 million pounds U3O8 to 24.0 million pounds U3O8, to accommodate an annual production rate of 18.0 million pounds U3O8 from the CLJV. All costs for the expansion of the McClean Lake mill were paid by the CLJV.

Federally, Orano Canada, as operator, obtained a 10 year licence from the CNSC for operation of both McClean and Midwest projects, valid to June 30, 2027, and provincially, Orano Canada has maintained required provincial permitting. The current licence authorizes mining of the McClean North deposits using hydraulic borehole mining methods (SABRE) and includes the care and maintenance activities at the Midwest site.

Cigar Lake Toll Milling – Ecora Transaction

Pursuant to the Ecora Transaction in February 2017, certain of Denison’s interests in the Cigar Lake toll milling proceeds have been sold to Ecora and its subsidiary Centaurus Royalties Ltd. (“Centaurus”) for aggregate gross proceeds to Denison of $43,500,000. The Ecora Transaction is comprised of the following elements: (1) a 13 year limited recourse lending arrangement involving a loan from Ecora to 9373721 Canada Inc. (“SPV”) (the “Ecora Loan”) and a further loan from SPV to DMI (the “SPV Loan”) each for $40,800,000 (collectively, the “Lending Arrangement”); and (2) $2,700,000 in proceeds from the sale, to Centaurus, of a stream equal to Denison’s 22.5% share of proceeds from the toll milling of Cigar Lake ore by the McClean Lake mill for specified Cigar Lake toll milling throughput in excess of 215 million pounds U3O8 after July 1, 2016 (the “Stream Arrangement”).

2024 ANNUAL INFORMATION FORM    64


Additional details of the Ecora Transaction are as follows:

No Warranty of the Future Rate of Production - No warranty is provided by Denison (including DMI and SPV) to Ecora (including Centaurus), under the terms of the Lending Arrangement or the Stream Arrangement, regarding: the future rate of production at the Cigar Lake mine and / or the McClean Lake mill; or the amount or collectability of proceeds to be received by the MLJV in respect of toll milling of Cigar Lake ore.
Ecora Loan Details - The Ecora Loan will accrue interest at a rate of 10% per annum and does not have a predetermined principal repayment schedule. The Ecora Loan is secured by a first priority interest in the assets of SPV which will essentially consist of the SPV Loan to DMI.
SPV Loan Details - The SPV Loan will accrue interest at a rate of approximately 10% per annum and does not have a predetermined principal repayment schedule. The SPV Loan is limited in its recourse against DMI such that it is generally repayable only to the extent of Denison’s share of the toll milling revenues earned by the MLJV from the processing of the first 215 million pounds of U3O8 from Cigar Lake ore on or after July 1, 2016. Denison will guarantee the limited recourse loan repayments and will grant a second ranking pledge of its share of DMI to secure performance by DMI of its obligations to pay the SPV Loan. The share pledge is second ranking to Denison’s existing pledge of its shares of DMI to the Bank of Nova Scotia under the terms of the Credit Facility.

SABRE Mining Program

The Surface Access Borehole Resource Extraction (SABRE) program is focused on developing a viable alternate mining method combining surface drilling and borehole mining technology. Benefits of the method may include a reduced time to production, reduced or deferred capital costs, as well as minimized safety and environmental risks.

Hydraulic borehole mining is a technique used to extract materials through a small access borehole, typically less than one-half of a metre in diameter, resulting in a very small disturbance to the surface. A mining tool containing a high-pressure water jet nozzle is lowered through the access borehole in the overburden and sandstone to the mineralized horizon. The high-pressure water jet is used to cut or erode the mineral-bearing ore and to create a cavity up to four metres in diameter. The cuttings are transported to surface in a slurry form and sent through a series of screens and settling ponds to separate the ore from the jetting water. Jetting water is filtered further and re-used in the process. Each mined out cavity is backfilled after completion with a cemented mixture in the mineralized horizon.

Between 2007 and 2012, approximately 2,100 tonnes of ore was recovered through various SABRE test mining programs, a portion of which has been fed to the mill between 2007 and 2014. After the completion of several significant milestones in 2012 and 2013, a decision was made in late 2013 to suspend the SABRE program in 2014 in response to the low uranium price environment. In 2015, SABRE activities were limited to patent applications and upgrading down-hole sonar capabilities with the objective of improving surveying of cavity dimensions and mining performance. In 2016, an expanded program was evaluated for SABRE including the re-tooling of the program to allow for larger volumes and jetting pressures designed to increase the production rate. In addition, the purchase, installation and testing of a new solid / liquid separation system was completed to assess the improvement in recovery of small uranium particles from the production slurry created during the SABRE mining process.

In 2017 and 2018, development of the re-tooled SABRE program continued with engineering of larger diameter mining pipes, procurement of high-pressure pumps and a tendering process to contract drilling equipment and labour for a further mining test. In addition, in 2018 four access holes were drilled and cased from surface to just above the McClean North orebody elevation. At the time, it was expected that these access holes would be used in 2020 as part of planned mining tests using the re-tooled equipment. In 2019, engineering and procurement activities for the re-tooled mining equipment continued and various equipment acceptance testing activities were completed. Due in part to COVID-19 pandemic related operational disruptions, work at SABRE in 2020 focused on further de-risking various elements of the SABRE equipment and the SABRE mining process.

2024 ANNUAL INFORMATION FORM    65


In 2021, the MLJV completed the SABRE test mining program at McClean North, using the access holes drilled in 2018. The SABRE field test ran safely from May to September 2021 with four cavities mined and the recovery of approximately 1,500 tonnes of high-value ore ranging in grade from 4% to 11% U3O8. The program was concluded successfully with no safety, environmental or radiological incidents. Importantly, key operating objectives associated with the test program – including targets for cavity diameter, rates of recovery, and mine production rates – were all achieved during the field test.

The majority of the ore recovered from the 2021 test mining program was processed at the McClean Lake mill in late 2021. Denison’s share of production was 40,000 pounds of U3O8.

In January 2024, Denison and Orano Canada announced that the MLJV approved a restart of uranium mining operations using the joint venture’s patented SABRE mining method. Mining is planned to commence at the McClean North deposit Pod 1 East in 2025. Activities during 2024 focused on preparations necessary to ready the existing SABRE mining site and equipment for continuous commercial operations, as well as the installation of access holes for the first mining cavities planned for excavation. Further access holes are planned to be completed in 2025. Future additional targets for mining are expected to be other McClean North deposit pods and the Sue F deposit (formerly Caribou).

2024 ANNUAL INFORMATION FORM    66


Environmental, Health, Safety and Sustainability Matters

The Company has an Environmental, Health, Safety & Sustainability Policy (the “EHSS Policy”) that affirms Denison’s commitment to prioritize the safety of its workers, its contractors, its community and the environment as well as the principles of sustainable development. Under the EHSS Policy, the Company has committed to run its operations in compliance with applicable legislation, in a manner that minimizes the impact on local ecosystems. The EHSS Policy mandates the use of regular monitoring programs to identify risks to the environment, to the public, Indigenous Rights holders, and to Denison’s employees and contractors and to ensure compliance with regulatory requirements. The EHSS Policy also sets out Denison’s requirement to train its employees on environmental, health and safety compliance and sustainability best practices.

The EHSS Policy requires regular reporting to the Board regarding the Company’s compliance and the results of the Company’s monitoring. To assist the Board with its responsibilities in overseeing environmental, health and safety matters, the Board has established the Environment, Health, Safety & Sustainability Committee, which works with management to discuss matters affecting the environment, health and safety and its stakeholders and reporting and making recommendations to the Board.

Indigenous Peoples Policy and Reconciliation Action Plan

In 2021, Denison announced that its Board of Directors approved the adoption of an Indigenous Peoples Policy, which reflects the Company’s recognition of the important role of Canadian business in the process of reconciliation with Indigenous peoples in Canada and outlines the Company’s commitment to take action towards advancing reconciliation.

The IPP was developed based on Denison’s experiences with, as well as feedback and guidance received from, Indigenous communities with whom the Company is actively engaged. This approach was designed to ensure the IPP appropriately captures a mutual vision for reconciliation.

Denison’s IPP reflects the Company’s belief that reconciliation is advanced through collaboration with Indigenous peoples and communities to build long-lasting, respectful, trusting and mutually beneficial relationships while aspiring to avoid adverse impacts of Denison’s activities and operations.

The IPP identifies 5 key areas of action that will support the ongoing development of a continuously evolving Reconciliation Action Plan: Engagement; Empowerment; Environment; Employment; and Education. Through the Reconciliation Action Plan, Denison is striving to interweave the principles of reconciliation throughout all areas of the company’s operations. In expressing the Company’s intentions in the IPP, Denison carefully considered the standards and principles articulated by The United Nations Declaration on the Rights of Indigenous Peoples and Call to Action 92 (Business and Reconciliation) from Canada’s Truth and Reconciliation Commission.

As of 2024, Denison has made notable progress in relation to the key areas identified in its Reconciliation Action Plan, including the following highlights:

Engagement

Denison’s engagement practices with northern Saskatchewan Indigenous communities for the Company’s exploration activities continue to evolve and reflect the mutually agreed frameworks for information sharing and project permitting set out in each of the ERFN Exploration Agreement (defined below), KML Exploration Agreement and YNLRO Exploration Agreement. Key outcomes of the agreements for ERFN, KML, the Athabasca Nations, and the Athabasca Communities are predictable information-sharing processes, in which matters of importance can be shared in a respectful and solution-oriented manner.

Denison has also continued to advance engagement efforts for Wheeler River, ensuring comprehensive involvement of Indigenous interested parties in the EA.

2024 ANNUAL INFORMATION FORM    67


Empowerment

Agreements: In 2024, Denison entered into the SPA with ERFN, MBA with KML, CBA with Pinehouse, and SCIA with the SCIA Communities. Each of these signatories have provided letters of support and consent to the regulators in respect of the development of Wheeler River.

These are in addition to: (A) the SPA signed with ERFN in 2023, with respect to which ERFN has commented publicly that the Shared Prosperity Agreement negotiated with Denison is the ‘best agreement in the country for the size and scale of the Project’; (B) funding agreements that support the full and meaningful participation of Indigenous interested parties to negotiate impact benefit type agreements for the Wheeler River project; and (C) ongoing discussions and negotiations with other Indigenous interested parties.

Procurement: In Saskatchewan, Denison has strong procurement processes in place that ensures consideration of Indigenous-owned businesses for the supply of goods and services and the satisfaction of its agreement commitments.

In 2024, 28% of Saskatoon evaluation and exploration expenditures (excluding salaries) was with Indigenous vendors and 27% was with Northern Saskatchewan vendors, many of whom are Indigenous or employ Indigenous persons.

Environment

Denison maintains high standards of environmental compliance across all of its operations and ensures transparency with local communities.

Denison has entered into funding agreements with each of ERFN, KML, the YNLRO (with and for the Athabasca Nations and Athabasca Communities), and the Métis Nation – Saskatchewan, to support significantly enhanced participation in the EA process for the Wheeler River project.

Employment

In Saskatchewan, Denison has developed hiring practices and processes that provide early notice to Indigenous communities as part of Denison’s commitment to employment of Indigenous People.

In 2024, Denison became a user of the EXPORT employment tool, which was built by the Saskatchewan First Nations Centre of Excellence and is intended to ease the process of communicating and sharing potential employment opportunities with Denison’s Indigenous Communities of Interest.

At the end of 2024, 17% of employees self-identified as Indigenous, 9 of which were First Nations, 4 were Métis and 1 did not disclose status. 32.5% of the individuals hired in 2024 self-identified as Indigenous, evidencing Denison’s efforts to establish an environment that supports representation of Indigenous talent in the workplace.

Education

Denison has created an environment which encourages participation, and provides supporting resources, with respect to Indigenous educational initiatives.

Over the course of the year, Denison has created opportunities for staff to undergo immersive learning in partnership with Indigenous communities, including attendance at community events.

For the National Day for Truth and Reconciliation on September 30, 2024, 30 Denison staff (including many of the Company’s senior executives), representing approximately 38% of Denison’s entire team, were welcomed to attend an event in Pinehouse, for joint commemoration of the day and a celebration of the signing of the MBA with KML and CBA with Pinehouse.

In addition, for National Indigenous History Month and for the National Day for Truth and Reconciliation, Denison provided curated Indigenous-authored fiction and non-fiction books for staff, providing a unique way to learn about and reflect on the Canadian Indigenous experience.

2024 ANNUAL INFORMATION FORM    68


Early Commitments:

To formalize Denison’s early commitment to work together, Memoranda of Understanding were signed with several groups in 2018. More recently, various funding agreements have been reached with Indigenous communities and organizations to provide capacity for Indigenous interested parties to actively participate in the environmental assessment process. Through these engagement commitments and processes, Denison is able to identify key concerns from these interested parties and develop plans to respond to and/or to resolve them.

Exploration Agreements:

A foundational element of Denison’s Indigenous relations strategy is the execution of (a) the 2021 Exploration Agreement with ERFN in respect of Denison’s exploration and evaluation activities within the ERFN traditional territories (“ERFN Exploration Agreement”), (b) the KML Exploration Agreement, and (c) the YNLRO Exploration Agreement. These agreements are related to Denison’s exploration and evaluation activities that occur within the traditional territory and/or designated land and occupancy area of each group. Denison was the first corporate party to enter into agreements of this kind with each of these parties, and the agreements are considered to be first-of-a-kind in Saskatchewan. At a high level, the agreements establish a framework for a cooperative and mutually beneficial relationship between the parties, which respects and is informed by the rights and interests of ERFN, KML and YNLRO, the Athabasca Nations and Athabasca Communities, respectively, while supporting Denison’s exploration and evaluation activities in the applicable areas. The exploration agreements each provide a basis for predictable information-sharing and permitting, with an emphasis on environmental protection and monitoring, support for community development initiatives, and the sharing of benefits. These agreements demonstrate Denison’s desire to conduct and advance its exploration activities in a progressive and sustainable manner that advances reconciliation with Indigenous peoples and provides economic opportunities and other benefits to the communities near where it operates in an authentic, cooperative, and respectful way.

Impact-Benefit Type Agreements:

Denison has been working towards the finalization of impact-benefit type agreements with certain Indigenous groups to further formalize support for the planned activities at site. These agreements focus on a number of areas, such as financial arrangements, business and procurement, environmental considerations, future regulatory processes, and employment considerations.

ERFN SPA, 2023: The signing of the SPA with ERFN followed years of active engagement, including a four-month-long ERFN-led community consultation process ahead of the ratification vote, and represents a significant milestone in the history of both Denison’s relationship with ERFN and the Wheeler River project. The SPA acknowledges that Wheeler River is located within ERFN’s Ancestral Lands and provides Denison with ERFN’s consent to advance Wheeler River. Additionally, the SPA outlines a shared recognition that ERFN is the Knowledge Keeper of the culture, ways, customs, and values of ERFN in relation to the environment and its Members and reflects ERFN’s desire to prioritize sustainability. Amongst other key commitments, the SPA provides ERFN and its Members with (i) an important role in environmental monitoring and management, and (ii) benefits from community investment, business opportunities, employment and training opportunities, and financial compensation. Overall, the SPA describes a mutual commitment to maintain an open, respectful, and cooperative relationship between Denison and ERFN to ensure mutual prosperity as the development and operation of Wheeler River progresses.

SCIA with the Communities, 2024: Denison signed the SCIA with the municipalities of the Northern Village of Beauval, the Northern Village of Île-à-la Crosse, the Northern Hamlet of Jans Bay, and the Northern Hamlet of Cole Bay. The SCIA reflects a common goal of facilitating qualified businesses and workers in benefitting from opportunities associated with the development of Wheeler River. The SCIA establishes commitments for funding to support community development initiatives, focused on contributing to the current and future economic prosperity and sustainability of the Communities by promoting economic development and investments in capital projects, job creation and training, housing, education, and other initiatives. In consideration for such contributions to the Communities’ initiatives, the Communities have provided their consent and support for the Wheeler River project and have committed, amongst other things, to support all regulatory approvals issued for the Wheeler River project related to exploration, evaluation, development, operation, reclamation, and closure activities.

2024 ANNUAL INFORMATION FORM    69


KML MBA and Pinehouse CBA, 2024: Denison signed the MBA with KML and the CBA with Pinehouse, in support of the development and operation of Wheeler River. The MBA acknowledges that Wheeler River is located within KML’s Land and Occupancy Area in northern Saskatchewan and provides KML’s consent and support to advance the project. Additionally, the MBA recognizes that the development and operation of Wheeler River can support KML in advancing its social and economic development aspirations, while mitigating the impacts on the local environment and KML members. The MBA provides KML and its Métis members an important role in environmental monitoring and commits to the sharing of benefits from the successful operation of Wheeler River – including benefits from community investment, business opportunities, employment and training opportunities, and financial compensation. The CBA acknowledges that Pinehouse is the closest residential community to Wheeler River by road, which relies on much of the same regional infrastructure that Denison will rely on as it advances the project. Pinehouse has provided its consent and support for Wheeler River, while Denison, on behalf of the WRJV, is committed to help Pinehouse develop its own capacity to take advantage of economic and other development opportunities in connection with the advancement and operation of the project.

Operational Safety & Environmental Performance

Safety and environmental incidents are tracked and reported quarterly to the Company’s Environment, Health, Safety and Sustainability Committee.

In 2024, Denison’s Saskatchewan operations (including contractors) recorded a total recordable injury rate (TRIR) per 200,000 hours of 2.33 and:

one lost time injury
one recordable medical aid
12 first aid incidents
seven incidents of property damage
four motor vehicle incidents
zero radiation doses above targets

There was one permitting and environmental non-compliance in 2024, for which remediation activities have been undertaken, and no environmental impact of such incidents has been detected.

The Closed Mines group in Elliot Lake, Ontario, has continued its excellent safety performance and, as at December 31, 2024, the team had worked over 909,000 cumulative hours, representing over 15 years of continuous service, without a lost time injury.

Overall, the Company (including contractors) had a TRIR of 1.80, with 222,078 cumulative hours worked.

Reclamation and Decommissioning Plans

Elliot Lake

Denison’s uranium mine at Elliot Lake, Ontario, which started operations in 1957, was permanently closed upon completion of deliveries of U3O8 to Ontario Hydro in May 1992. During its 35 years of continuous operation, the facility produced 147 million pounds of U3O8 in concentrates from the milling of 70 million tons of ore. By 1998, all significant capital reclamation activities at Denison’s two closed Elliot Lake mines had been completed and, for the most part, decommissioning has progressed to the long-term monitoring phase.

The Company monitors the tailings management areas at the Denison and Stanrock closed mine sites and treats the applicable water discharged from these areas. The Company conducts its activities at both sites pursuant to licenses issued by the CNSC.

2024 ANNUAL INFORMATION FORM    70


The decommissioned Denison mine site contains two flooded tailings management areas (Denison TMA 1 and Denison TMA 2) and two effluent treatment plants (“ETP”). Water cover is used to inhibit oxidation and acidification of the tailings and reduce gamma and radon exposure. Pond water, which passively flows to the ETP when levels are high enough, is treated to remove radium-226 at the ETPs prior to being discharged into the watershed. The Stanrock mine site tailings management area has a vegetated cover. Surface water runoff and seepage are collected in a holding pond and treated for pH adjustment at the ETP prior to discharge to the watershed.

During 2024, the ETPs operated as planned and all environmental targets were met.

All activities and monitoring results are reviewed regularly by the CNSC and the Elliot Lake Joint Regulatory Group, which consists of federal and provincial regulators. Pursuant to a Reclamation Funding Agreement, effective June 30, 1994, with the Governments of Canada and Ontario, Denison has established a Reclamation Trust from which all spending on its Elliot Lake reclamation activities is funded. When the Reclamation Trust was first established in 1994, Denison was required to deposit 90% of its cash receipts after deducting permitted expenses, as defined in such agreement, into the Reclamation Trust. In 1997, the Governments of Canada and Ontario agreed to suspend the 90% funding requirement provided Denison maintained four years of cash requirements in the Reclamation Trust. Early in 1999, the Governments of Canada and Ontario agreed to further amend the Reclamation Funding Agreement, effective when Denison received an amended site decommissioning licence, which was obtained on April 22, 1999. Pursuant to that amendment, Denison is required to maintain sufficient funds in the Reclamation Trust to meet six years of cash requirements. It is estimated that sufficient funds are in the Reclamation Trust to meet all monitoring costs through 2030.

McClean Lake and Midwest

The McClean Lake and Midwest projects are combined under a single Mine Operating Licence issued by the CNSC. The most recent combined PDP was prepared by Orano Canada and approved by the CNSC in January 2022, concurrently with its approval of an amendment to the operating licence for phase 2 of the TMF Expansion.

The updated PDP estimates the total decommissioning and reclamation costs for both projects to be $102,098,000 (a reduction from the previously approved 2016 plan, which estimated $107,241,000). Denison’s share of the financial assurances required to be provided to the Province of Saskatchewan has decreased from $24,135,000 to $22,972,000.

Other Projects

Denison’s exploration and evaluation activities are subject to Saskatchewan environmental regulations. Denison’s share of the financial assurances required to be provided to the Province of Saskatchewan for exploration and evaluation activities at Wheeler River is $893,000.

2024 ANNUAL INFORMATION FORM    71


Government Regulation

Saskatchewan Exploration and Land Tenure

In Canada, natural resource exploration and land tenure activity fall under provincial legislative jurisdiction. In Saskatchewan, the management of mineral resources and the granting of exploration and mining rights for mineral substances and their use are regulated by the Crown Minerals Act (Saskatchewan) and The Mineral Tenure Registry Regulations, 2012, which are administered by the Saskatchewan Ministry of Energy and Resources.

The right to explore for minerals in Saskatchewan is acquired under a mineral claim from the province. The initial term of a mineral claim is two years, renewable for successive one–year periods, provided the mineral claim is in good standing. To maintain a mineral claim in good standing, generally, the holder of a mineral claim must expend a prescribed amount on exploration. Excess expenditures (also known as assessment credits) can be applied to satisfy expenditure requirements for future claim years. Except for exploration purposes, a mineral claim does not grant the holder the right to mine minerals. A holder of a mineral claim in good standing has the right to convert a mineral claim into a mineral lease. Surface exploration work on a mineral claim requires additional governmental approvals.

The right to mine minerals in Saskatchewan is acquired under a mineral lease from the province. A mineral lease is for a term of 10 years, with a right to renew for successive 10-year terms in the absence of default by the lessee. The lessee is required to spend certain amounts for work during each year of a mineral lease. A mineral lease cannot be terminated except in the event of default and for certain environmental concerns, as prescribed in The Crown Minerals Act (Saskatchewan). However, mineral leases may be amended unilaterally by the lessor by amendment to The Crown Minerals Act (Saskatchewan) or The Crown Mineral Royalty Regulations, 2013 (Saskatchewan).

Mineral rights, held through mineral claims and mineral leases, are distinct from surface rights. The surface facilities and mine workings are located on lands owned by the province of Saskatchewan. The right to use and occupy lands is acquired under a surface lease from the province of Saskatchewan. A surface lease is for a period of time, up to a maximum of 33 years, as is necessary to allow the lessee to operate its mine and plant and thereafter carry out the reclamation of the lands involved. Surface leases are also used by the province of Saskatchewan as a mechanism to achieve certain environmental, radiation protection and socio-economic objectives, and contain certain undertakings in this regard.

Environmental Assessments

An EA is a planning and decision-making tool, which involves predicting potential environmental effects through each phase of the project (construction, operation, decommissioning and post-decommissioning) at the site, and within the local and regional assessment areas.

The assessment of a proposed uranium project in Saskatchewan involves both provincial and federal regulatory oversight. In Saskatchewan, the assessment of a project with joint federal and provincial jurisdiction is coordinated through established protocols in order to align with the “one project-one assessment” model for the proponent and the public without compromising any statutory requirements of the legislation of either jurisdiction.

The Saskatchewan Environmental Assessment Act is administered by the SKMOE. The level of assessment for mining projects is dependent on the specific characteristics of each individual project. A proponent is required to conduct an EA for a project that is considered to be a “development” pursuant to the Saskatchewan Environmental Assessment Act and subsequently prepare and submit an EIS to the SKMOE for approval.

Federally, CEAA 2012 includes the Regulations Designating Physical Activities to clarify when a federal EA is required and which federal agency will act as the “responsible authority” for the conduct of the EA. For uranium projects, the CNSC is designated as the “responsible authority” under the CEAA 2012 and carries full authority to complete the federal screening of the proposed project and any subsequent environmental assessments.

2024 ANNUAL INFORMATION FORM    72


Under CEAA 2012, an EA’s scope focuses on potential adverse environmental effects that are within federal jurisdiction including: (a) fish and fish habitat and other aquatic species; (b) migratory birds; (c) federal lands; (d) effects that cross provincial or international boundaries; (e) effects that impact on Indigenous peoples, such as their use of lands and resources for traditional purposes, and (f) changes to the environment that are directly linked to or necessarily incidental to any federal decisions about a project, including how nuclear facilities or uranium mines and mills interact with the environment and human health.

The Government of Canada implemented a new Impact Assessment Act (the “IAA”), to replace the CEAA 2012 on August 28, 2019. The transitional provision (section 182 of the IAA) provides that a CNSC designated project EA, which commenced under the CEAA 2012, is to be continued under the CEAA 2012. This means that the Wheeler River EA for Phoenix will complete the assessment process under CEAA 2012.

For other Denison projects, any future uranium mines and mills proposed to produce less than 2500/tonnes per day would not generally be subject to a federal assessment under IAA. The project would still be required to obtain a federal license (discussed below), which would not be issued until the provincial EA has been completed and the CNSC has reached a decision as to whether the project may proceed.

Wheeler River

Project Description and Environmental Assessment

In 2019, Denison executed on its decision to advance the Wheeler River Project through the EA regulatory process following the release of the 2018 PFS. Activities completed in 2019 included the submission of two key documents to provincial and federal regulators, with respect to the proposed ISR mining operation: 1) the Saskatchewan Provincial Technical Proposal and the Federal Project Description (together, the “EA Project Description”) and 2) the Terms of Reference. Acceptance of these documents was announced by both the SKMOE and the CNSC on June 1, 2019. Following a public review and comment period, final confirmation of the scope and guidelines for the Project EA was received from the CNSC on December 20, 2019. The Company identified the EA process as a key element of the Project’s critical path.

In early 2020, shortly after the initiation of the EA technical assessments, Denison suspended all EA related studies in connection with the onset of the global COVID-19 pandemic. Formal correspondence was sent to the Project regulatory agencies (CNSC and SKMOE) as well as the local communities and Indigenous groups to inform them of the suspension.

In November 2020, Denison announced a plan to restart the EA in early 2021. In keeping with the requirements of the CNSC to post all EA related documents on the federal project registry website, a formal notification was submitted to the CNSC and the SKMOE to inform them of the recommencement of the EA.

Also in 2020, Denison presented the CNSC and the SKMOE with the possible change in freeze containment design for the Project. The discussion of the freeze design was originally outlined in the EA Project Description as a design feature intended to protect the regional ground water through complete encapsulation of the mining chamber by means of a freeze dome. Based on the results of the 2020 freeze wall trade-off study (see “Wheeler River – Mining Operations”), Denison identified the potential to reduce operational and environmental risks with a vertical freeze wall. Denison, under the direction of the CNSC, updated the EA Project Description to reflect the change, which was submitted and accepted by the regulators in December 2020.

In October 2022, Denison announced a significant regulatory milestone for Wheeler River with the submission of the draft EIS to the SKMOE and the CNSC. The EIS submission outlines the Company’s assessment of the potential effects, including applicable mitigation measures, of the proposed ISR uranium mine and processing plant planned for Wheeler River, and reflects several years of baseline environmental data collection, technical assessments, plus extensive engagement and consultation with Indigenous and non-Indigenous interested parties. Assessment components, including the ecological risk assessment and hydrogeological modelling, were of significant focus of technical studies undertaken in 2021 and 2022 in order to support the engineering design and mitigation measures for the Wheeler River Project. In addition, the Company’s consultants completed assessments on air quality, the terrestrial environment, hydrology and worker health and safety.

2024 ANNUAL INFORMATION FORM    73


The Company has worked closely with the primary regulatory agencies involved in the Project, the CNSC and the SKMOE, in order to ensure that the Company’s methodology for the EA assessment components is in line with regulatory requirements and expectations.

Following the submission of the draft EIS to the CNSC and the SKMOE, the CNSC conducted a conformity review of the document in relation to the CNSC’s Guidelines for the Preparation of an EIS pursuant to CEAA 2012. In November 2022, the CNSC concluded that the draft EIS met all requirements and commenced a 90-day period for public and federal technical review. In the first quarter of 2023, the Company received technical comments and information requests from both regulatory agencies and the Company has provided technical responses to both the Provincial and Federal regulators. In connection therewith, Denison met with various technical review sub committees to provide information and answer questions on technical assessment details described in the EIS.

In August 2023, reflective of the extensive efforts undertaken by and for the Company, the CNSC deemed complete the Company’s responses to approximately 250 EIS information requests from the FIRT. In November 2023, a subsequent round of information requests was received from the CNSC, seeking additional details for responses not fully accepted by the FIRT.

In October 2023 the SKMOE confirmed its satisfaction with Denison’s comment responses and proposed EIS updates. The confirmation would allow Denison to finalize the EIS for the purpose of obtaining a Provincial EA approval, however Denison elected to defer submission until the federal EA was further advanced through its review.

In 2024, multiple key federal regulatory milestones were achieved, including (i) completion of the technical review phase of the federal EA approval process in November, (ii) acceptance by the CNSC of the EIS in December, and (iii) the CNSC’s determination of the sufficiency of Denison’s application for a Licence to Construct in November. These accomplishments indicate that the CSNC staff support the advancement of the Phoenix project. Accordingly, the CNSC Registrar has set the schedule for the CNSC public hearing for Wheeler River. The hearing is scheduled to be held in two parts (October 8, 2025, and December 8 to 12, 2025) and represents the final step in the federal approval process for the federal EA and Licence to Construct.

In October 2024, Denison submitted the final EIS to the SKMOE, in substantially the same form as the EIS that has been submitted to the CNSC. The province completed a public and Indigenous review period on the EIS in November and December 2024, of which the comments received will be considered in the issuance of a Ministerial Decision for the EA.

Corporate Social Responsibility

Denison has been focused on strengthening many long-term relationships, and building new relationships, with Indigenous and non-Indigenous communities who have a strong connection to the land on which the Wheeler River project is located. Denison supports various community initiatives and activities, as part of its focus on community investment.

The Company has conducted site tours for the Indigenous and municipal leaders for communities of interest and representatives of the CNSC and SKMOE, including two site tours in 2019, one site tour in 2022 and multiple site tours in 2023. Site tours did not take place during 2020 and 2021 due to COVID-19. Tours have generally focused on introducing the community members to the site, providing an overview of the Company’s project-related activities and offering an opportunity for collaboration with Denison and the regulators regarding the advancement of the project. During 2024, Denison has continued to focus on ensuring that Indigenous and non-Indigenous communities are provided regular information about Denison’s operated projects, including Wheeler River, which has included multiple in-community meetings, leadership meetings, focused workshops, and regular correspondence.

For more information on Denison’s engagement and related activities, see “Environmental, Health, Safety and Sustainability Matters - Indigenous Peoples Policy and Reconciliation Action Plan” above.

2024 ANNUAL INFORMATION FORM    74


McClean and Midwest

Environmental matters related to the McClean Lake uranium facility and the Midwest project are regulated by the CNSC and the SKMOE. A number of other ministries and departments of the federal and Saskatchewan governments also regulate certain aspects of the operation. Prior to proceeding with development of the McClean Lake uranium facility and Midwest project, the proponents were required to submit Environmental Impact Statements for review. After completion of that review and receipt of recommendations, the federal and Saskatchewan governments issued the appropriate initial authorizations, subject to the normal licensing renewal process, for the McClean Lake uranium facility in 1995 and for Midwest in 2012.

Licensing and Permitting

The federal government recognizes that the uranium industry has special importance in relation to the national interest and therefore regulates the mining, extraction, use and export of uranium under the Nuclear Safety and Control Act (“NSCA”). The NSCA is administered by the CNSC which issues licences pursuant to the regulations under the NSCA.

In the event EA approvals by both the provincial and federal governments are granted, as applicable, a project will be allowed to proceed to the second tier of approvals for licences. The federal (CNSC) licensing process requires the submission of detailed engineering design packages as well as detailed management plans for all facets of the operation as part of their licensing process. The federal licences are typically the licence (i) to prepare a site and construct, (ii) operate, (iii) decommission, and (iv) abandon. Under provincial jurisdiction, a number of permits and approvals are required prior to construction. Key requirements include the execution of a Surface Lease Agreement with the Province of Saskatchewan and an Approval to Construct and Operate a Pollutant Control Facility as regulated under the Saskatchewan Environmental Management and Protection Act (2010).

Activities at McClean Lake and Midwest are currently carried out under a single operating licence issued by the CNSC and are subject to all applicable federal statutes and regulations and to all laws of general application in Saskatchewan, except to the extent that such laws conflict with the terms and conditions of the licences or applicable federal laws.

Decommissioning activities at Elliot Lake are currently carried out under two decommissioning licences issued by the CNSC: for the Stanrock tailings area and the Denison mine site and tailings areas. Decommissioning of the facilities pursuant to the terms of the decommissioning licences has been completed. The CNSC has initiated the actions to combine the Stanrock and Denison sites under one Waste Facility Operating Licence. There are no significant differences between the different forms of licences. After a lengthy period of care, maintenance and monitoring, Denison may apply to the CNSC for permission to cease care of the reclaimed sites.

Saskatchewan Royalties

The province of Saskatchewan imposes royalties on the sale of uranium extracted from ore bodies in the province in accordance with Part III of The Crown Mineral Royalty Regulations (the “Regulations”) pursuant to The Crown Minerals Act (the “Act”). Significant revisions to the uranium royalty regime in Saskatchewan became effective on January 1, 2013, with the resulting regime consisting of the following three components:

1.Basic Royalty: Computed as 5% of gross revenues derived from uranium extracted from ore bodies in the province;
2.Saskatchewan Resource Credit: Reduction in the basic royalty equal to 0.75% of gross revenues derived from uranium extracted from ore bodies in the province; and
3.Profit Royalty: Two-tier rate structure, computed as 10% or 15% of net profits derived from the mining and processing of uranium extracted from ore bodies in the province.

2024 ANNUAL INFORMATION FORM    75


Gross revenue, for the Basic Royalty, is determined in accordance with the Regulations and allows for reductions based on specified allowances. Net profit, for the Profit Royalty, is calculated based on the recognition of the full dollar value of a royalty payer’s exploration, capital, production, decommissioning and reclamation costs, in most cases, incurred after January 1, 2013. Net profits will be taxed under the profit royalty at a rate of 10% for net profits up to and including $22.00 per kg ($10 per pound) of uranium sold, and at 15% for net profits in excess of $22.00 per kg. The $22.00 per kg threshold is applicable for 2013 (the base year) and is indexed in subsequent years for inflation. For 2024, the indexed amount is $28.73 per kg ($13.06 per pound).

Under this system, each owner or joint venture participant in a uranium mine is a royalty payer. Individual interests are consolidated on a corporate basis for the computation and reporting of royalties due to the province.

Royalty payments are due to the province on or before the last day of the month following the month in which the royalty payer sold, or consumed, the uranium for the purposes of the basic royalty, and quarterly installments are required based on estimates of net profits in respect of the profit royalty.

Canadian Income and Other Taxes

Denison and its Canadian subsidiaries are subject to federal and provincial income taxes. In 2023, taxable income was subject to federal taxes at a rate of 15%, and provincial taxes in Saskatchewan, Ontario, Quebec, British Columbia and the Yukon Territory at rates varying between 11.5% and 12.0%. Taxable income for each entity is allocated between provinces and territories based on a two point average of the proportion of salaries and revenues attributable to each province or territory. Denison expects that it will not be liable for Canadian income taxes on a current tax basis for the financial year ended 2023. As a resource corporation in Saskatchewan, Denison is also subject to a resource surcharge equal to 3% of the value of resource sales from production in Saskatchewan, if any, during the year. For 2023, Denison did not accrue any resource surcharges.

Denison has issued shares eligible for treatment as “flow through shares”, as defined in subsection 66(15) of the Income Tax Act (Canada). As a result, a significant portion of Denison’s Canadian Exploration Expenditures were renounced to shareholders and are not available to Denison as a tax deduction in the current year or future years.

Audit / Review by Taxing Authorities

From time to time, Denison is subject to audit / review by taxing authorities. In certain jurisdictions, periodic reviews are carried out by taxing authorities in the ordinary course of business. Denison cooperates with all requests received from taxing authorities, and is not currently engaged in a material dispute with any of the applicable taxing authorities.

2024 ANNUAL INFORMATION FORM    76


Risk Factors

Denison’s business, the value of the Shares and management’s expectations regarding the same are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Denison to be materially different than anticipated.

The Board of Directors of Denison have, as part of their mandate, responsibility for the identification of the principal risks of the Company’s business and ensuring the implementation of appropriate systems to manage these risks. Where appropriate, they have delegated responsibility for periodic review of certain risks to the Committees of the Board with mandates relevant to such risks.

Audit

    

Corp Gov & Nominating

    

Compensation

    

EHSS

    

Technical

Financial reporting, internal controls, ethics, and information technology, cyber security and artificial intelligence risks

Compliance, governance and succession risks

Compensation related risks

Health & safety, environment and sustainability risks, including climate-related risks

Operational performance risks

Management, with input from the Committees, reports to the Board at least semi-annually on the assessment of material risks to the Company.

The following are those risks, uncertainties and other factors pertaining to the outlook and conditions currently known to Denison that have been identified by the Company as having the potential to materially impact Denison’s business, financial condition and/or the value of the Shares. Current and prospective security holders of Denison should carefully consider these risk factors. However, the risks set out below are not the only risks Denison faces. Risks and uncertainties not currently known to or foreseen by the Company or that have currently been assessed as immaterial may also materially and adversely affect Denison’s business, financial condition, results of operations and prospects.

There is no assurance that Denison will be successful in generating and/or obtaining sufficient financing to fund its operations.

The exploration and development of mineral properties and operation of mines and associated facilities requires a substantial amount of capital and the ability of the Company to proceed with any of its plans with respect thereto depends on its ability to: (a) obtain financing through joint ventures, equity financing, debt financing or other means, (b) monetize current uranium investments, and/or (c) produce income from the sale of future produced uranium inventory.

The Company is currently in discussions with several parties, including financial institutions, strategic and other potential investors, and financial and legal advisors, to evaluate appropriate sources of financing for the construction of Phoenix, assuming the receipt of applicable permits and approvals, including the approval of the EA and the Licence to Construct, and the making of an FID by the Board. Funding for construction and development of Phoenix may come from various sources, including Denison’s strategic holdings of physical uranium and/or new financing transactions or arrangements, including equity financing, debt financing, stream financing, joint venturing or other means. There is no assurance that the Company will be successful in generating and/or obtaining required financing as and when needed on acceptable terms.

For example, general market conditions, volatile uranium markets, changing international policies, a claim against the Company, a significant disruption to the Company’s business or operations, or other factors may make it difficult to secure the financing necessary to fund the substantial capital that is typically required in order to advance a mineral project, such as Wheeler River, through the testing, feasibility, engineering, and permitting processes necessary to support a production decision, or to place a property into commercial production.

Failure to obtain sufficient financing as and when needed on acceptable terms could result in the delay or indefinite postponement of any or all of the Company’s exploration, development or other growth initiatives.

2024 ANNUAL INFORMATION FORM    77


Denison anticipates having negative operating cash flows in future periods, for which funds will have to be sourced or raised.

Denison had negative operating cash flow for recent past financial reporting periods. Denison anticipates that it will continue to have negative operating cash flow until such time, if at all, its Wheeler River project goes into production. To the extent that Denison has negative operating cash flow in future periods, Denison may need to allocate a portion of its cash reserves and/or physical uranium holdings to fund such negative cash flow. Denison may also be required to raise additional funds through the issuance of equity or debt securities, or asset sales. There can be no assurance that additional capital or other types of financing will be available when needed or that these financings will be on terms favourable to Denison.

Denison’s access to public financing and credit can be negatively impacted by global financial conditions.

Global financial conditions are subject to volatility arising from international geopolitical and global economic developments, general financial market turbulence, and market expectations of the same. Examples of such are the broad market impacts observed in connection with the Russia-Ukraine war and evolving trading policies of the United States. Access to public financing and credit in Canada can be negatively impacted by global financial conditions. Accordingly, the health of the global financing and credit markets may impact the ability of Denison to obtain equity or debt financing in the future and the terms at which financing or credit is available to Denison. Instances of volatility and market turmoil could adversely impact Denison’s operations and the trading price of the Shares.

Mineral exploration and development are inherently speculative, and there is no assurance that the Company’s uranium interests are or will be commercially mineable.

Exploration for minerals and the development of mineral properties are speculative and involve significant uncertainties and financial risks that even a combination of careful evaluation, experience and technical knowledge may not eliminate. While the discovery of an ore body may result in substantial rewards, few properties which are explored result in the discovery of a commercially mineable deposit and/or are ultimately developed into producing mines. As at the date hereof, many of Denison’s projects are preliminary in nature and mineral resource estimates include inferred mineral resources, which are considered too speculative geologically to have the economic considerations applied that would enable them to be categorized as mineral reserves. Mineral resources that are not mineral reserves do not have demonstrated economic viability.

Major expenses may be required to properly evaluate the prospectivity of an exploration property, to estimate mineral resources, establish mineral reserves and ultimately develop an orebody. There is no assurance that the Company’s uranium deposits are commercially mineable.

The value of an investment in Denison could be materially impacted if the Company is unable to establish technical or economic feasibility for its projects, obtain required regulatory approvals and permitting, or maintain estimated project execution objectives and milestones.

Denison’s uranium production is dependent in part on the successful development of its known ore bodies, discovery of new ore bodies and/or revival of previously existing mining operations. The decision as to whether a property contains a commercial mineral deposit and should be brought into production will depend upon market conditions, as well as the results of exploration and evaluation programs and/or feasibility studies, and the recommendations of duly qualified engineers and/or geologists, all of which involves significant expense and risk. It is impossible to ensure that Denison’s current exploration and development programs will result in profitable commercial mining operations.

Projects being considered for development are subject to the completion of successful feasibility studies, engineering studies and environmental assessments, the issuance of necessary governmental permits and the availability of adequate financing, the completion or attainment of which are subject to their own risks and uncertainties. The inability to achieve necessary tasks or obtain required inputs, or any delays in the achievement of any key project tasks or inputs, could cause significant delays in timing, cost or results of the assessment of feasibility and/or the process to advance any project to a development decision. The economic feasibility of development projects is based upon many factors, including, among others: the accuracy of mineral reserve and resource estimates; metallurgical recoveries; capital and operating costs of such projects; government regulations relating to prices, taxes, royalties, infrastructure, land tenure, land use, importing and

2024 ANNUAL INFORMATION FORM    78


exporting, and environmental protection; political and economic climate; and uranium prices, which are historically volatile and cyclical.

For Wheeler River, the Company has been able to estimate the existence of mineral resources and mineral reserves and establish the potential for economic feasibility for commercial development, as set forth in, and subject to the estimates and assumptions described in, the Wheeler Report. Substantial expenditures are still required prior to obtaining the required environmental approvals, permits and assets needed to commence commercial operations.

Where a feasibility study is completed by Denison, such as the Phoenix FS, any estimates of mineral reserves and mineral resources, development costs and schedule, operating costs and estimates of future cash flow contained therein, will be based on Denison’s interpretation of the information available to-date. Development projects have no operating history upon which to base developmental and operational estimates. Particularly for development projects, economic analyses and feasibility studies contain estimates based upon many factors, including estimates of mineral reserves, the interpretation of geologic and engineering data, anticipated tonnage and grades of ore to be mined and processed, the configuration of the ore body, expected recovery rates of uranium from the ore, estimated operating costs, anticipated climatic conditions and other factors. In addition, results from further studies completed on the project may alter the plans and/or schedule for a project, which in turn may cause potentially significant delays to previous estimates of schedule and/or increases in estimated costs. As a result, it is possible that actual capital and operating costs and economic returns will differ significantly from those estimated for a project prior to production. For example, the plan and schedule, the capital and operating cost projections, and the related economic indicators, in the Wheeler Report may vary significantly from actual expenditures.

It is not unusual in the mining industry for new mining operations to take longer than originally anticipated to bring into a producing phase, and to require more capital than anticipated. Any of the following events, among others, could affect the profitability or economic feasibility of a project or delay or stop its advancement: unavailability of necessary capital, unexpected problems during the start-up phase delaying production, unanticipated changes in grade and tonnes of ore to be mined and processed, unanticipated adverse geological conditions, unanticipated metallurgical recovery problems, incorrect data on which engineering assumptions are made, project execution and management challenges due to rapid growth and administrative changes and reliance on third parties, unavailability of labour, increases in operating costs (including due to inflation), increased costs of mining or processing and refining facilities, unavailability of economic sources of power and water, unanticipated transportation costs, changes in government regulations (including regulations with respect to the environment, prices, royalties, duties, taxes, permitting, restrictions on production, quotas on exportation of minerals, etc.), changes or delays in permitting and regulatory approval processes or restrictions associated with permitting or regulatory approvals, fluctuations in uranium prices, accidents, labour actions and force majeure events.

The ability to sell and profit from the sale of any eventual mineral production from a property will be subject to project execution and management challenges due to rapid growth and administrative changes and reliance on third parties, contractual commitments, the prevailing conditions in the applicable marketplace at the time of sale, and applicable government regulations. The demand for uranium and other minerals is subject to global economic influences and changing attitudes of consumers and demand from end-users.

Many of these factors are beyond the control of a mining company and therefore represent a market risk which could impact the long-term viability of Denison and its operations.

Selection and use of novel mining methods present significant opportunities, as well as increased execution risk, for Denison.

As disclosed in the Wheeler Report, Denison has selected the ISR mining method for production at the Phoenix deposit. While industry best practices have been utilized in the development of its estimates and technical studies, and field testing completed to date indicates that ground conditions and the mineral reserves estimated to be contained within the deposit are amenable to extraction by way of ISR to the level of certainty appropriate for a feasibility study, actual conditions could be materially different from those estimated.

The MLJV has developed the patented SABRE mining method and has previously evaluated this innovative mining method via test mining at McClean Lake. While important milestones for the SABRE technology have been achieved to date, actual operations for a full-scale mining operation have not been proven and could be materially different than currently projected or otherwise anticipated.

2024 ANNUAL INFORMATION FORM    79


It is possible that actual costs and economic returns of any mining operations may differ materially from Denison’s or the MLJV’s best estimates, as applicable.

If these novel mining methods can be advanced, their commercial use beyond the projects for or on which they are being developed could present a significant opportunity for Denison and/or the MLJV to expand upon the benefits of such investments in innovation; however, the ability and process for a joint venture, or either partner thereof, to use the mining method on projects outside of their respective joint ventures has not yet been established.

The Company’s project viability and operational outlook could be negatively impacted by the volatility and sensitivity to fluctuations in uranium market prices.

The value of the Company’s current physical uranium holdings, its estimates of mineral resources and mineral reserves, and the viability of future production for its projects are heavily influenced by long and short term market prices of U3O8. Historically, these prices have seen significant fluctuations, and have been and will continue to be affected by numerous factors beyond Denison’s control. Such factors include, among others: demand for nuclear power, political, economic and social conditions in uranium producing and consuming countries, public and political response to nuclear incidents, reprocessing of used reactor fuel and the re-enrichment of depleted uranium tails, sales of excess civilian and military inventories (including from the dismantling of nuclear weapons) by governments and industry participants, uranium supplies from other secondary sources, production levels and costs of production from primary uranium suppliers, and forward contracts of U3O8 supplies.

Uranium prices failing to reach or sustain projected levels can impact operations by requiring a reassessment of the Company’s financial resources and/or the economic viability of the Company’s projects, and such reassessment alone may cause substantial delays and/or interruptions in project development, which could have a material adverse effect on the results of operations and financial condition of Denison.

Changes in uranium supply and demand dynamics, geopolitical and economic conditions, and/or international trade regulations could also materially impact the demand for Denison’s projected future production. If Denison is unable to sell uranium inventory as and when needed on acceptable terms, or then-current economic or logistical conditions negatively impact its ability to enter and/or fulfill commercial sales contracts, it could have a material adverse effect on the results of operations and financial condition of Denison.

If the Company proceeds with the development of Phoenix, Denison expects to use a uranium contracting strategy for its uranium production to reduce volatility in its future earnings and cash flow from exposure to fluctuations in uranium prices while maintaining exposure to future price increases. Such strategy is expected to be made up of fixed and/or base-escalated priced contracts and market-related priced contracts, including medium-to long term and spot related transactions and other commercial arrangements. Contracts that include some element of fixed or base-escalated pricing bear the risk of opportunity losses for the quantities sold, as Denison may not realize the benefits of subsequent increases in U3O8 prices; whereas, purely market-related priced contracts or spot market transactions would expose Denison to fluctuations in uranium prices that could adversely impact its future earnings, cash flows, financial condition, results of operations or prospects. There is no assurance that Denison’s contracting strategy will be successful and may not adequately mitigate Denison’s exposure to factors that could adversely impact its future earnings, cash flows, financial condition, results of operations or prospects.

Denison will endeavour to enter into contracts for future delivery of uranium based upon expected production and other factors. Should Denison’s actual production and/or uranium inventory available for delivery fall short of expectations or contracted amounts, it may be required to procure replacement uranium for delivery into contracts under adverse terms and conditions, or face potential consequences of failure to deliver in accordance with its obligations. Conversely, if Denison enters into contracts for uranium quantities less than its available uranium inventory and/or expected uranium production, it may be unable to find alternative means of selling such potential excess quantities on adequate terms, or at all. Any such outcomes could adversely impact Denison’s future earnings, cash flows, financial condition, results of operations or prospects.

2024 ANNUAL INFORMATION FORM    80


Denison’s operations are dependent on permitting and licensing.

The development of mines and related facilities is contingent upon governmental approvals that are complex and time consuming to obtain and which may involve the coordination of multiple governmental agencies. The ability of the Company to obtain and maintain permits and approvals and to successfully explore and evaluate properties and/or develop and operate mines may be adversely affected by real or perceived impacts associated with its activities that impact the environment and human health and safety at its projects and in the surrounding communities.

The real or perceived effects of the activities of other mining companies, locally or globally, may also adversely impact the Company’s ability to obtain and maintain permits and approvals. Mining companies are often targets of actions by non-governmental organizations and environmental groups in the jurisdictions in which they operate. Such organizations and groups may take actions in the future to disrupt Denison’s operations. They may also apply pressure to local, regional and national government officials to take actions which are adverse to Denison’s operations. Such actions could have an adverse effect on Denison’s ability to advance its projects and, as a result, on its financial position and results.

Environmental and regulatory review has become a long, complex and uncertain process that can cause potentially significant delays. Obtaining these government and regulatory approvals includes among other things, completing environmental assessments and engaging with Indigenous and local communities. See “Environmental, Health, Safety & Sustainability Matters” for more information regarding Denison’s community engagement. The timely completion of the approval processes is challenged by relatively limited resources utilized by applicable government and regulatory agencies. In addition, future changes in governments, regulations and policies, such as those impacting Denison’s mining operations and uranium transport, could materially and adversely affect Denison’s results of operations and financial condition in a particular period or its long-term business prospects.

There can be no assurance that the Company will obtain or renew all necessary permits on acceptable terms or in a timely manner. Any significant delays in obtaining or renewing such permits or licences in the future could have a material adverse effect on Denison.

Denison’s operations are subject to extensive regulatory and policy risk.

Uranium mining and milling operations and exploration activities, as well as the transportation and handling of the products produced, are subject to extensive regulation by federal, provincial, and state governments. Such regulations relate to production, development, exploration, exports, imports, taxes and royalties, labour standards, occupational health, waste disposal, protection and remediation of the environment, mine decommissioning and reclamation, mine safety, toxic substances, transportation safety and emergency response, engagement with Indigenous peoples, and other matters. Compliance with such laws and regulations is currently, and has historically, increased the costs of exploring, drilling, developing, constructing, operating and closing Denison’s mines and processing facilities.

Denison expends significant financial and managerial resources to comply with such laws and regulations. Denison anticipates it will have to continue to do so as the trend toward stricter government regulation may continue. Because legal requirements are frequently changing and subject to interpretation, Denison is unable to predict the ultimate cost of compliance with these requirements or their effect on operations. While the Company has taken great care to ensure full compliance with its legal obligations, there can be no assurance that the Company has been or will be in full compliance with all of these laws and regulations, or with all permits and approvals that it is required to have.

It is possible that the costs, delays and other effects associated with such laws and regulations may impact Denison’s decisions with respect to exploration and development properties, including whether to proceed with exploration or development. It is also possible that such laws and regulations may result in Denison incurring significant costs due to a material change required to the methods of mining, milling, transportation and other project elements and/or to remediate or decommission properties in accordance with applicable environmental standards beyond those already established and estimated by the Company.

2024 ANNUAL INFORMATION FORM    81


Failure to comply with applicable laws, regulations and permitting requirements, even inadvertently, may result in enforcement actions. These actions may result in orders issued by regulatory or judicial authorities causing operations to cease or be curtailed, and may include corrective measures requiring capital expenditures, installation of additional equipment or remedial actions. Companies may be required to compensate others who suffer loss or damage by reason of their exploration or other activities and may have civil or criminal fines or penalties imposed for violations of applicable laws or regulations.

Denison is subject to risks and uncertainties related to engagement with Canada’s First Nations and Métis Peoples.

First Nations and Métis rights, entitlements and title claims may impact Denison’s ability and that of its joint venture partners to pursue exploration, development and mining at its Saskatchewan properties. Pursuant to historical treaties, First Nations in northern Saskatchewan are entitled to pursue hunting, fishing and other activities on their traditional lands and continue to assert title to the minerals within the lands. Métis people have not signed treaties; they assert Indigenous rights throughout Saskatchewan, including Indigenous title over the Company’s project lands.

Managing relations with the local First Nations and Métis communities is a matter of paramount importance to Denison. Engagement with, and consideration of other rights of, potentially affected Indigenous peoples may require accommodations, including undertakings regarding funding, contracting, environmental practices, employment and other matters. In the course of engagement, the Company also faces competing interests and demands. This may affect the timetable and costs of exploration, evaluation and development of the Company’s projects.

The Company’s relationships with communities of interest are critical to ensure the future success of its existing operations and the construction and development of its projects. There is an increasing level of public concern relating to the perceived effect of mining activities on the environment and communities. Adverse publicity relating to the mining industry generated by non-governmental organizations and others could have an adverse effect on the Company’s reputation or financial condition and may impact its relationship with the communities in proximity to which it operates. While the Company is committed to operating in a socially responsible manner, there is no guarantee that the Company’s efforts in this regard will mitigate this potential risk.

The inability of the Company to maintain positive relationships with local First Nations and Métis communities and other communities of interest may result in additional obstacles to permitting, increased legal challenges, or other disruptions to the Company’s exploration, development and production plans, and could have a significant adverse impact on the Company’s share price and financial condition.

Denison could be negatively impacted by its reliance on contractors and experts.

In various aspects of its operations, Denison relies on the services, expertise and recommendations of its service providers and their employees and contractors, whom often are engaged at significant expense to the Company. For example, the decision as to whether a property contains a commercial mineral deposit and should be brought into production will depend in large part upon the results of exploration programs and/or feasibility studies, and the recommendations of duly qualified third-party engineers and/or geologists.

If the Company proceeds with the development of Phoenix, the timely and cost-effective completion of the work will significantly depend on the satisfactory performance of Denison’s contractors, which may include design and engineering consultants responsible for the different elements of the site and mine plans, procurement, construction management and/or construction contractors. If any of these contractors or consultants do not perform to accepted or expected standards, there could be significant delays or cost consequences for the project and the Company. Denison is taking efforts to mitigate that risk, including planning for an integrated project team to manage all aspects of the Phoenix project. While Denison emphasizes the importance of conducting operations in a technically sound, safe, sustainable and cost-effective manner, it cannot exert absolute control over the actions of these third parties when providing services to Denison or otherwise operating on Denison’s properties. Any failure to act or material error, omission, act of negligence or act resulting in a technical failure, environmental pollution, accidents or spills, industrial and transportation accidents, work stoppages or other actions could adversely affect the Company’s operations and financial condition.

2024 ANNUAL INFORMATION FORM    82


Failure to maintain qualified and experienced employees on which Denison depends could result in business interruption.

Denison’s success depends on the efforts and abilities of certain senior officers and key employees. Certain of Denison’s employees have significant experience in the uranium industry, and the number of individuals with significant experience in this industry is small. While Denison does not foresee any reason why such officers and key employees will not remain with Denison, if for any reason they do not, Denison could be adversely affected. Denison has not purchased key man life insurance for any of these individuals.

Denison’s success also depends on the availability of and its competitiveness for qualified and experienced employees to work in Denison’s operations and Denison’s ability to attract and retain such employees. Effective staffing is about having the right numbers of the right people, in the right place at the right time, with the suitable knowledge, skill and experience to operate safety and effectively and to maintain compliance with internal controls, procedures and policies. To meet the Company’s objectives, Denison has been and will continue to need to increase its staffing levels to ensure it has suitable and sufficient organizational structures, staffing and competencies in place to effectively and reliably carry out its activities. As Denison continues with the development of Phoenix and its activities increase, Denison will require additional skilled labour, such as construction, operations, engineering, and financial personnel. There is a risk that Denison will not be successful in attracting, training and retaining qualified personnel as competition for persons with these skill sets increases. If Denison is not successful in attracting, training and retaining qualified personnel, the development of Phoenix and the efficiency of Denison’s operations could be impaired, which could have an adverse impact on Denison’s results of operations and financial condition. In addition, failure to adequately address such operational risks could result in breakdowns in internal procedures and systems, which could have a material adverse impact on the Company.

Disagreements or disputes with Denison’s joint venture counterparties could materially adversely impact the Company’s operations.

The Company is party to a number of joint venture arrangements which are material to the Company. The existence or occurrence of one or more of the following circumstances and events could have a material adverse impact on the Company’s business prospects, results of operations and financial condition: disagreements with joint venture partners on how to conduct exploration or development activities; inability of joint venture partners to meet their obligations to the joint venture or third parties; and disputes or litigation between joint venture partners regarding budgets, development activities, reporting requirements and other joint venture matters. The Company is, and has been, involved in disputes with its joint venture partners pursuant to the dispute resolution provisions of a joint venture agreement or civil claims. Any such disputes may not be resolved in the Company’s favour.

Public health emergencies could materially impact business and operation plans.

As in the case of COVID-19, public health emergencies may cause disruptions to the Company’s business and operational plans. Such disruptions may result from (i) restrictions that governments and communities impose to address the emergency, (ii) restrictions that the Company and its contractors and subcontractors impose to ensure the safety of employees and others, (iii) shortages of employees and/or unavailability of contractors and subcontractors, and/or (iv) interruption of supplies from third parties upon which the Company relies. A disruption may have a material adverse effect on the Company’s business, financial condition and results of operations, which could be rapid and unexpected.

Compliance costs and risks of non-compliance with environmental, health, safety and other regulations could have a material adverse impact on Denison’s financial condition or results of operations.

Denison has expended significant financial and managerial resources to comply with environmental protection laws, regulations and permitting requirements in each jurisdiction where it operates, and anticipates that it will be required to continue to do so in the future as the historical trend toward stricter regulation may continue. The possibility of more stringent regulations exists in the areas of worker health and safety, the disposition of wastes, the decommissioning and reclamation of mining and processing sites, and other environmental matters each of which could have a material adverse impact on the costs or the viability of a particular project.

2024 ANNUAL INFORMATION FORM    83


Denison’s facilities operate under various operating and environmental permits, licences and approvals that contain health, safety and/or environmental conditions that must be met, and Denison’s right to pursue its development plans is dependent upon receipt of, and compliance with, additional permits, licences and approvals. Failure to obtain such permits, licences and approvals and/or meet any conditions set forth therein could have a material adverse effect on Denison’s financial condition or results of operations.

Although the Company believes its operations comply, in all material respects, with all relevant permits, licences and regulations involving worker health and safety as well as the environment, there can be no assurance regarding continued compliance or ability of the Company to meet stricter environmental regulation, which may also require the expenditure of significant additional financial and managerial resources.

Health and safety hazards may pose a risk to employees, contractors and operations.

Exploration and mining development and operating activities represent inherent safety hazards and maintaining the health and safety of the Company’s employees and contractors is of paramount importance to Denison. The Company has policies, procedures and controls in place intended to maintain the health and safety of its operations. Notwithstanding such efforts, safety incidents may still occur. Significant potential risks include, but are not limited to, vehicle accidents, unsafe road conditions or events and contact with energized sources.

Operations in the uranium industry are subject to risks uniquely associated with uranium mining and processing. For example, the risk of over-exposure to radiological materials by the Company’s employees, contractors, or others is inherent in Denison’s operations, as they involve the treatment, monitoring, possession, handling, storage and/or transportation of radioactive materials (uranium, radon, etc.).

Employees involved in activities in remote areas may also be exposed to additional hazards as a result of equipment failure, such as risk of failure of heating equipment or damage to camp facilities; risk of being stranded due to breakdown or damage to mobile equipment, or risk of attacks on employees by wildlife. The impact of such hazards could be exacerbated by limited access to first aid or other medical care and/or delayed emergency response time.

Any incident resulting in serious injury or death could have profound impacts on the Company, its employees and others, as well as result in litigation and/or regulatory action (including, but not limited to suspension of development activities, fines or penalties), or otherwise adversely affect the Company’s reputation and ability to meet its objectives.

Mineral reserve and resource estimates may prove inaccurate.

Mineral reserve and resource figures are estimates, and no assurances can be given that the estimated quantities of uranium are in the ground and could be produced, or that Denison will receive the prices assumed in determining its mineral reserves. Such estimates are expressions of judgment based on knowledge, mining experience, analysis of drilling results and industry best practices. Valid estimates made at a given time may significantly change when new information becomes available. By their nature, mineral reserve and resource estimates are imprecise and depend, to a certain extent, upon statistical inferences and geological interpretations, which may ultimately prove inaccurate. Furthermore, market price fluctuations, as well as increased capital or production costs or reduced recovery rates, may render mineral reserves and resources uneconomic and may ultimately result in a restatement of mineral reserves and resources. The evaluation of mineral reserves or resources is always influenced by economic and technological factors, which may change over time.

Global demand fluctuations and international trade policies and restrictions could adversely affect Denison’s outlook and financial condition.

The international nuclear fuel industry, including the supply of uranium concentrates, is relatively small compared to other minerals, and is generally highly competitive and heavily regulated. Worldwide demand for uranium is directly tied to the demand for electricity produced by the nuclear power industry, which is also subject to extensive government regulation and policies. In addition, the international marketing of uranium is subject to governmental policies and certain trade restrictions. For example, the supply and marketing of uranium from Russia is limited by international trade agreements and could be impacted by policy changes in the United States and/or elsewhere.

2024 ANNUAL INFORMATION FORM    84


In general, trade agreements, governmental policies and/or trade restrictions are beyond the control of Denison and may affect the supply of uranium available for use in markets like the United States and Europe, which are currently the largest markets for uranium in the world. Similarly, trade restrictions or foreign policy have the potential to impact the ability to supply uranium to developing markets, such as China and India. If substantial changes are made to regulations affecting the global marketing and supply of uranium, the Company’s business, financial condition and results of operations may be materially adversely affected.

The current United States administration has been making, and is expected to continue to make, legislative and regulatory changes that could have an adverse effect on the Company and its financial condition. In particular, there is uncertainty regarding the scope and scale of U.S. tariffs and whether there will continue to be support for existing treaty and trade relationships between the U.S. and its trading partners, including Canada. So far in 2025, the United States has enacted or proposed broad-based tariff on goods imported into the United States. Changes in or the imposition of any new tariffs, taxes or import or export restrictions or prohibitions impacting imports to and exports from Canada could impose additional costs on the Company, decrease U.S. demand for the Company’s products, or otherwise negatively impact the Company. Furthermore, there is a risk that any broad-based tariffs on the scale currently proposed by the United States will trigger a broader global trade war which could have a material adverse effect on the Canadian, U.S. and global economies overall, which in turn could have a material adverse impact on the Company’s business.

Lack of public acceptance of nuclear energy and competition from other energy sources may result in lower demand for uranium.

Growth of the uranium and nuclear power industry will depend upon continued and increased acceptance of nuclear technology as a clean means of generating electricity. Because of unique political, technological and environmental factors that affect the nuclear industry, including the risk of a nuclear incident, the industry is subject to public opinion risks that could have an adverse impact on the demand for nuclear power and increase the regulation of the nuclear power industry.

Nuclear energy competes with other sources of energy, including oil, natural gas, coal and hydro-electricity. These other energy sources are, to some extent, interchangeable with nuclear energy, particularly over the longer term. Technical advancements in, and government subsidies for, renewable and other alternate forms of energy, such as wind and solar power, could make these forms of energy more commercially viable and put additional pressure on the demand for uranium concentrates. Sustained lower prices of alternate forms of energy may result in lower demand for uranium concentrates.

Market projections for future demand for uranium are based on various assumptions regarding the rate of construction and approval of new nuclear power plants, as well as continued public acceptance of nuclear energy around the world. The rationale for adopting nuclear energy can be varied, but often includes the clean and environmentally friendly operation of nuclear power plants, as well as the affordability and round-the-clock reliability of nuclear power. A change in public sentiment regarding nuclear energy could have a material impact on the number of nuclear power plants under construction, planned or proposed, which could have a material impact on the market’s and the Company’s expectations for the future demand for uranium and the future price of uranium.

The Russia-Ukraine war has highlighted to many global policymakers the significant geopolitical risk associated with an over reliance on sources of energy from politically unstable jurisdictions. In many cases, this has resulted in increased calls for a renewed focus on energy independence, to which many nations have identified nuclear power as a potentially critical energy alternative that can both improve energy sovereignty and support the achievement of carbon emission reduction climate goals.

Denison is reliant on other operators for the advancement and maintenance of certain of its joint venture interests and other properties.

For certain of Denison’s property interests, Denison is not the operator and therefore is not in control of the applicable activities and operations. As a result, Denison is and will be, to a certain extent, dependent on the operators for the nature and timing of activities related to these interests and may be unable to direct or control such activities.

2024 ANNUAL INFORMATION FORM    85


As an example, Orano Canada is the operator and majority participant in the MLJV and MWJV. The McClean Lake mill employs unionized workers who work under collective agreements. Orano Canada, as the operator, is responsible for most operational and production decisions and all dealings with unionized employees and its decisions drive mill and mining operations. Similarly, Orano Canada is responsible for all licensing and dealings with various regulatory authorities. Orano Canada maintains the regulatory licences for operation of the McClean Lake mill, all of which are subject to renewal from time to time and are required in order for the mill to operate in compliance with applicable laws and regulations. Any lengthy work stoppages, or disruption to the operation of the mill or mining operations as a result of a licensing matter or regulatory compliance, may have a material adverse impact on the Company’s future cash flows, earnings, results of operations and financial condition.

Denison is reliant on the licensed storage facilities with which it stores its physical uranium.

Any uranium purchased by the Company will be stored at one or more licensed uranium conversion facilities (“Facilities”), each owned by different third-party organizations. As the number of duly licensed Facilities is limited, there can be no assurance that storage arrangements that are commercially beneficial to the Company will remain readily available. Failure to negotiate commercially reasonable storage terms with the Facilities may have a material impact on the Company’s plans with respect to the physical uranium holdings.

As there is only one Facility in Canada, storage for a portion of the Company’s uranium holdings is with a Facility in the United States, and conversion and storage arrangements for the Company’s current uranium holdings and any future uranium production, as applicable, could be impacted by geopolitical or international trade factors.

By holding its investments in uranium with licensed Facilities, the Company is exposed to the credit risks of any such Facilities and their operators. There is no guarantee that the Company can fully recover all of its investments in uranium held with the Facilities. Failure to recover all uranium holdings could have a material adverse effect on the financial condition of the Company.

Any loss or damage of the uranium may not be fully covered or absolved by contractual arrangements with the Facilities or the Company’s insurance arrangements, and the Company may be financially and legally responsible for losses and/or damages not covered by indemnity provisions or insurance. Any failure to recover all of the uranium holdings could have a material adverse effect on the financial condition of the Company.

Fluctuations in foreign exchange rates could negatively affect the Company.

The Company maintains its accounting records and reports its financial position and results in Canadian dollars. Fluctuations in the U.S. currency exchange rate relative to the Canadian currency could significantly impact the Company, including its financial results, operations or the trading value of its securities, as the price of uranium is quoted in U.S. dollars, and a decrease in value of U.S. dollars would result in a relative decrease in the valuation of uranium and the associated market value from a Canadian currency perspective. Exchange rate fluctuations, and any potential negative consequences thereof, are beyond the Company’s control.

The Company may not realize the intended benefits of its transactions.

Denison has completed a number of corporate transactions over the last several years, including without limitation the acquisition of physical uranium, and investments in Foremost, Cosa, KLP, JCU and F3 Uranium. Despite Denison’s belief that these transactions, and others which may be completed in the future, will be in Denison’s best interest and benefit the Company and Denison’s securityholders, Denison may not realize the anticipated benefits of such transactions or realize the full value of the consideration paid or received to complete the transactions. This could result in significant accounting impairments or write-downs of the carrying values of mineral properties or other assets and could adversely impact the Company and the price of its Shares.

If the Company proceeds with the development of Phoenix, Denison expects it may enter into agreements with multiple counterparties with respect to project financing initiatives and/or the sale of potential uranium production. Denison may not realize the anticipated benefits of such transactions due to risks of counterparty non-performance, including non-payment or other default, which could adversely impact the Company.

2024 ANNUAL INFORMATION FORM    86


Denison may be unable to exploit, expand and/or replace mineral reserves and mineral resources.

Denison’s mineral reserves and resources estimated for its projects are currently the only projected future sources of possible uranium production. Unless other mineral reserves or resources are discovered or acquired, Denison’s sources of future production for uranium concentrates will decrease over time if its current mineral reserves and mineral resources are exploited or otherwise revised. There can be no assurance that future exploration, development and acquisition efforts will be successful in replenishing its mineral reserves and resources. In addition, while Denison believes that many of its properties demonstrate development potential, there can be no assurance that they can or will be successfully developed and put into production in future years.

Competition for properties could limit the Company’s ability to add to or replace mineral reserves and mineral resources.

Significant competition exists for the limited supply of mineral lands available for acquisition. Participants in the mining business include large established companies with long operating histories. In certain circumstances, the Company may be at a disadvantage in acquiring new properties as competitors may have incumbency advantages, greater financial resources and more technical staff. Accordingly, there can be no assurance that the Company will be able to compete successfully to acquire new properties or that any such acquired assets would yield resources or reserves or result in commercial mining operations.

Challenges to Denison’s title to or interest in its properties could have a material adverse effect on Denison’s operations.

The Company has investigated its rights to explore and exploit its properties and, to the best of its knowledge, those rights are in good standing. However, no assurance can be given that such rights will not be revoked, or significantly altered, to its detriment. There can also be no assurance that the Company’s rights will not be challenged or impugned by third parties, including the federal, provincial and local governments in Canada, as well as by First Nations and Métis.

There is also a risk that Denison’s title to, or interest in, its properties may be subject to defects or challenges. If such defects or challenges cover a material portion of Denison’s property, they could have a material adverse effect on Denison’s results of operations, financial condition, reported mineral reserves and resources and/or long-term business prospects.

Failure to renew or a default in obligations under the Credit Facility or other debt arrangement, as applicable, could have a material adverse impact on Denison’s operations and financial condition.

The Credit Facility has a term of one year that has been renewed annually and will need to be renewed again on or before January 31, 2026. There is no certainty what terms of any renewal may be, or any assurance that such renewal will be made available to Denison.

Denison is required to satisfy certain financial covenants in order to maintain its good standing under the Credit Facility. Denison is also subject to a number of restrictive covenants under the Credit Facility and the Ecora Transaction, such as restrictions on Denison’s ability to incur additional indebtedness and sell, transfer or otherwise dispose of material assets. Denison may from time to time enter into other arrangements to borrow money in order to fund its operations and expansion plans, and such arrangements may include covenants that have similar obligations or that restrict its business in some way.

Events may occur in the future, including events out of Denison’s control, which could cause Denison to fail to satisfy its obligations under the Credit Facility, Ecora Transaction or other debt instruments. In such circumstances, the amounts drawn under Denison’s debt agreements may become due and payable before the agreed maturity date, and Denison may not have the financial resources to repay such amounts when due. The Credit Facility and Ecora Transaction are secured by a pledge of the shares of DMI. If Denison were to default on its obligations under the Credit Facility, Ecora Transaction or other secured debt instruments in the future, the lender(s) under such debt instruments could enforce their security and seize significant portions of Denison’s assets.

2024 ANNUAL INFORMATION FORM    87


Restrictions on change of control could delay or disrupt transactions otherwise beneficial to the Company or its securityholders.

The Ecora Transaction and certain other of Denison’s agreements contain provisions that could adversely impact Denison in the case of a transaction that would result in a change of control of Denison or certain of its subsidiaries. If consent is required from our counterparty and the counterparty chooses to withhold its consent, then such transaction opportunity could have to be abandoned or, if such transaction were to proceed, the counterparty could seek to terminate certain agreements with Denison, including certain agreements forming part of the Ecora Transaction, or require Denison to buy the counterparty’s rights back from them, which could adversely affect Denison’s financial resources and prospects. If applicable, these restrictive contractual provisions could delay or discourage a change in control of the Company that could otherwise be beneficial to Denison or its securityholders.

Inaccuracy of decommissioning and reclamation estimates and insufficiency of financial assurance could impact the Company’s operations and financial condition.

As owner of the Elliot Lake decommissioned sites and part owner of the McClean Lake mill, McClean Lake mines, the Midwest uranium project and certain exploration properties, and for so long as the Company remains an owner thereof, the Company is obligated to eventually reclaim or participate in the reclamation of such properties. Most, but not all, of the Company’s reclamation obligations are secured, and cash and other assets of the Company have been reserved to secure this obligation. Although the Company’s financial statements record a liability for the asset retirement obligation, and the security requirements are periodically reviewed by applicable regulatory authorities, there can be no assurance or guarantee that the ultimate cost of such reclamation obligations will not exceed the estimated liability contained on the Company’s financial statements.

As Denison’s properties approach or go into decommissioning, regulatory review of the Company’s decommissioning plans may result in additional decommissioning requirements, associated costs and the requirement to provide additional financial assurances. It is not possible to predict what level of decommissioning and reclamation (and financial assurances relating thereto) may be required from Denison in the future by regulatory authorities.

Technical innovation and obsolescence could reduce the demand for the Company’s uranium.

Requirements for Denison’s products and services may be affected by technological changes impacting the mining and/or nuclear industries. For example, technological changes in nuclear reactors, enrichment and used uranium fuel processing could reduce the demand for uranium. In addition, Denison’s competitors may adopt technological advancements that give them an advantage over Denison.

Denison’s insurance coverage may not be sufficient to cover losses from risks inherent in exploration and mining operations resulting in material economic harm to Denison.

Denison’s business is capital intensive and subject to a number of risks and hazards, including environmental pollution, accidents or spills, industrial and transportation accidents, labour disputes, changes in the regulatory environment, natural phenomena (such as inclement weather conditions) and encountering unusual or unexpected geological conditions. Many of the foregoing risks and hazards could result in damage to, or destruction of, Denison’s mineral properties or processing facilities in which it has an interest; personal injury or death; environmental damage; delays in or interruption of or cessation of exploration, development, production or processing activities; or costs, monetary losses and potential legal liability and adverse governmental action. In addition, due to the radioactive nature of the materials handled in uranium exploration, mining and processing, as applicable, additional costs and risks are incurred by Denison and its joint venture partners on a regular and ongoing basis.

Although Denison maintains insurance to cover some of these risks and hazards in amounts it believes to be reasonable, such insurance may not provide adequate coverage in the event of certain circumstances. No assurance can be given that such insurance will continue to be available, that it will be available at economically feasible premiums, or that it will provide sufficient coverage for losses related to these or other risks and hazards.

2024 ANNUAL INFORMATION FORM    88


Denison may be subject to liability or sustain loss for certain risks and hazards against which it cannot insure or which it may reasonably elect not to insure because of the cost. This lack of insurance coverage could result in material economic harm to Denison.

Incidents with respect to Denison’s containment management obligations could have a material and adverse effect on its reputation, financial condition and results of operations.

Denison does not currently have any tailings production. However, the Company’s closed mines operations is engaged in long-term monitoring for Denison’s closed mines in Elliot Lake, Ontario for which decommissioning and restoration has been completed. Such monitoring includes the operation of tailings storage facilities, the results of which are reviewed regularly by the CNSC and the Elliot Lake Joint Regulatory Group, which consists of federal and provincial regulators. Denison’s other exploration and evaluation activities may also produce waste materials, for which containment procedures and practices are in place, in accordance with applicable regulatory and permit requirements. However, there is a risk of environmental contamination or other adverse effect due to a release of radioactive material or other materials produced by the Company’s activities if the infrastructure prepared therefor is not sufficient to achieve appropriate containment. Such an occurrence could have a material and adverse effect on the Company’s reputation, financial condition and results of operations.

The Company could be negatively impacted by any failure to comply with applicable anti-bribery and anti-corruption laws.

The Company is subject to anti-bribery and anti-corruption laws, including the Corruption of Foreign Public Officials Act (Canada) and the United States Foreign Corrupt Practices Act of 1977, as amended. Failure to comply with these laws could subject the Company to, among other things, reputational damage, civil or criminal penalties, other remedial measures and legal expenses which could adversely affect the Company’s business, results from operations, and financial condition. It may not be possible for the Company to ensure compliance with anti-bribery and anti-corruption laws in every jurisdiction in which its employees, agents, sub-contractors or joint venture partners are located or may be located in the future.

Climate change poses unique challenges that could materially impact Denison’s operations or financial condition.

Due to changes in local and global climatic conditions, many analysts and scientists predict an increase in the frequency of extreme weather events such as floods, droughts, forest and brush fires and extreme storms. Such events could materially disrupt the Company’s operations, particularly if they affect the Company’s sites, impact local infrastructure, disrupt supply chains, or threaten the health and safety of the Company’s employees, contractors and/or local communities. In addition, reported warming trends could result in later freeze-ups and warmer lake temperatures in the Athabasca Basin region, potentially negatively affecting the Company’s winter exploration programs.

The Company is focused on operating in a manner designed to minimize the environmental impacts of its activities; however, certain environmental impacts from mineral exploration and mining activities may be inevitable. Increased environmental regulation and/or the use of fiscal policy by regulators in response to concerns over climate change and other environmental impacts, such as additional taxes levied on activities deemed harmful to the environment, could have a material adverse effect on Denison’s financial condition or results of operations.

Information systems upon which the Company may rely could be insufficient and/or vulnerable to cyberattack.

One of the Company’s material assets is its operational data and intellectual property and the ability to effectively retain and access that data is a priority for Denison. There is a risk that corporate data management systems are not implemented or utilized effectively to achieve ease of access and retrieval of timely, accurate and meaningful information about the business operations and risks to enable informed decision-making.

The accessibility of the Company’s corporate data may also be compromised through information security breaches. Although to date the Company has not experienced any information security breaches or any losses relating to cyber-attacks, there can be no assurance that the Company will not incur such losses in the future.

2024 ANNUAL INFORMATION FORM    89


One of the most important things a company can do to prevent information security breaches is to ensure its people understand the importance of protecting its data and systems. In light of that, the Company has an Information Technology Acceptable Use Policy for its employees, for which it seeks annual review and affirmation of compliance, with procedures and practices in place designed to protect Denison’s information technology (“IT”) infrastructure. Denison also regularly deploys mandatory company-wide information technology and cyber-security training, to ensure familiarity with the risks and mitigation strategies.

The Company’s operations depend upon the availability, capacity, reliability and security of its IT infrastructure, and its ability to expand and update this infrastructure as required, to conduct daily operations. Denison relies on various IT systems in all areas of its operations, including financial reporting, contract management, exploration and development data analysis, human resource management, regulatory compliance and communications with employees and third parties.

These IT systems could be subject to network disruptions caused by a variety of sources, including computer viruses, security breaches and cyber-attacks, as well as network and/or hardware disruptions resulting from incidents such as unexpected interruptions or failures, natural disasters, fire, power loss, vandalism and theft. The Company’s operations also depend on the timely maintenance, upgrade and replacement of networks, equipment, IT systems and software, as well as pre-emptive expenses to mitigate the risks of failures.

The ability of the IT function to support the Company’s business in the event of any such occurrence and the ability to recover key systems from unexpected interruptions cannot be fully tested. There is a risk that, if such an event occurs, the Company’s continuity plan may not be adequate to immediately address all repercussions of the disaster. In the event of a disaster affecting a data centre or key office location, key systems may be unavailable for a number of days, leading to inability to perform some business processes in a timely manner. As a result, the failure of Denison’s IT systems or a component thereof could, depending on the nature of any such failure, adversely impact the Company’s reputation and results of operations.

Unauthorized access to Denison’s IT systems by employees or third parties could lead to corruption or exposure of confidential, fiduciary or proprietary information, interruption to communications or operations or disruption to the Company’s business activities or its competitive position. Further, disruption of critical IT services, or breaches of information security, could have a negative effect on the Company’s operational performance and its reputation. The Company’s risk and exposure to these matters cannot be fully mitigated because of, among other things, the evolving nature of these threats. As a result, cyber security and the continued development and enhancement of controls, processes and practices designed to protect systems, computers, software, data and networks from attack, damage or unauthorized access remain a priority.

The Company applies technical and process controls in line with industry-accepted standards to protect information, assets and systems, and is always considering initiatives to enhance its cyber and data security; however, these controls may not adequately prevent cyber-security breaches. There is no assurance that the Company will not suffer losses associated with cyber-security breaches in the future, and may be required to expend significant additional resources to investigate, mitigate and remediate any potential vulnerabilities. As cyber threats continue to evolve, the Company may be required to expend additional resources to continue to modify or enhance protective measures or to investigate and remediate any security vulnerabilities.

Events could cause the cost and impact of maintenance of key infrastructure and equipment to be significant or unexpected.

For continued operations and to ensure the health and safety of employees and others, the Company must maintain diverse physical assets and infrastructure. The cost of operation and maintenance and the operating performance of such facilities may be adversely affected by a variety of factors, including regular and unexpected maintenance and replacement expenditures; the aging of facilities which may reduce their operating performance and increase the cost of maintenance; potential breakdown or failure of equipment requiring emergency or temporary response; catastrophic events such as fires, explosions, earthquakes, volcanic eruptions, landslides, floods, releases of hazardous materials, severe storms or similar occurrences; and other factors discussed in these risk factors. Any of these events could significantly increase the expenses incurred by the Company and/or materially and adversely affect its business, financial condition and future results.

2024 ANNUAL INFORMATION FORM    90


Conflicts of interest with the Company’s directors or officers could have a material adverse impact on the Company.

Some of the directors and officers of Denison are also directors of other companies that are similarly engaged in the business of acquiring, exploring and developing natural resource properties. Such associations may give rise to conflicts of interest from time to time. In particular, one of the consequences would be that corporate opportunities presented to a director or officer of Denison may be offered to another company or companies with which the director or officer is associated, and may not be presented or made available to Denison. The directors and officers of Denison are required by law to act honestly and in good faith with a view to the best interests of Denison, to disclose any interest which they may have in any project or opportunity of Denison, and, where applicable for directors, to abstain from voting on such matter. Conflicts of interest that arise will be subject to and governed by the procedures prescribed in the Company’s Code of Ethics and by the OBCA.

Disclosure and internal control systems provide reasonable assurance, but not absolute assurance, with respect to the reliability of the Company’s financial reporting.

Internal controls over financial reporting are procedures designed to provide reasonable assurance that transactions are properly authorized, assets are safeguarded against unauthorized or improper use, and transactions are properly recorded and reported. Disclosure controls and procedures are designed to ensure that information required to be disclosed by a company in reports filed with securities regulatory agencies is recorded, processed, summarized and reported on a timely basis and is accumulated and communicated to the company’s management, including its Chief Executive Officer and Chief Financial Officer, as appropriate, to allow timely decisions regarding required disclosure. A control system, no matter how well designed and operated, can provide only reasonable, not absolute, assurance with respect to the reliability of reporting, including financial reporting and financial statement preparation.

Risks Related to Our Securities and Investments Therein

Fluctuations in the market price of the Shares are often outside the control of the Company and could materially impact securityholders’ investments in the Company and the Company’s access to capital.

The market price of Denison’s Shares may experience wide fluctuations which may not necessarily be related to the financial condition, operating performance, underlying asset values or prospects of the Company. These factors include macroeconomic developments in North America and globally, such as trade or tariff disputes, market perceptions of the attractiveness of particular industries – including mining and nuclear energy – and volatile trading due to unpredictable general market or trading sentiments.

The market price of Denison’s Shares are likely to increase or decrease in response to a number of events and factors, including: Denison’s operating performance and the performance of competitors and other similar companies; the breadth of the public market for the Shares and the attractiveness of alternative investments; volatility in metal prices; the number of Shares to be publicly traded after an offering pursuant to any prospectus or prospectus supplement; the public’s reaction to the Company’s press releases, material change reports, other public announcements and its filings with the various securities regulatory authorities; the arrival or departure of key personnel; public perception of the nuclear industry and reaction to the developments therein; changes in recommendations by research analysts who track the Shares or the shares of other companies in the sector; developments that affect the market for all resource sector securities; changes in general economic and/or political conditions (including changing governmental policies, trade agreements, trade restrictions and tariffs, inflation); acquisitions, strategic alliances or joint ventures involving Denison or its competitors; and the other risk factors listed herein.

The current United States administration has been making, and is expected to continue to make, legislative and regulatory changes that could result in a broader global trade war which could have a material adverse effect on the Canadian, U.S. and global economies overall, which in turn could have a material adverse impact on the market price of the Company’s Shares.

Many of these factors that could impact the market price of the Company’s Shares are not directly related to Denison’s results or operations and are, therefore, not within Denison’s control. Accordingly, the market price of the Shares at any given point in time may not accurately reflect the long-term value of Denison.

2024 ANNUAL INFORMATION FORM    91


In recent years, the Company has been affected by the results of a seemingly significant change in investor sentiment towards nuclear energy and uranium in connection with a global trend towards the transition to “clean” energy sources, which is believed to have resulted in increased trading volumes and price volatility of the Shares. Investor sentiment can change quickly, and investors may make investment decisions based on third party media and/or social media discussions that may not accurately reflect the Company’s disclosure or actual results of operations. Such sentiments may cause volatility in the trading price of the Shares and may or may not be reflective of individual investor’s views as to the value of the underlying assets.

Market sentiment and trading in an entity’s shares can also be impacted by its inclusion in, or exclusion from, certain equity benchmarks and/or investable indices. For example, in 2021 Denison’s Shares were added to the S&P/TSX Composite Index, the headline index for the Canadian equity market. This inclusion could impact the Company’s Share price positively, with increased interest in purchasing the Shares. However, a decline in the index could result in investors selling the Shares of the Company for reasons that are unrelated to the Company’s operating results, underlying asset values or prospects. In addition, the removal of the Company from the S&P/TSX Composite could have a negative impact on the market price of Shares, as certain shareholders who link investments to the index could be required to sell the Shares for reasons that are unrelated to the Company’s operating results, underlying asset values or prospects.

Accordingly, the market price of the Shares may decline even if the Company’s operating results, underlying asset values or prospects have not changed. Additionally, these factors, as well as other related factors, may cause decreases in asset values that are deemed to be other than temporary, which may result in impairment losses. There can be no assurance that continuing fluctuations in price and volume will not occur. If such increased levels of volatility and market turmoil continue, the Company’s operations could be adversely impacted, and the trading price of the Shares may be materially adversely affected.

Securities class-action litigation often has been brought against companies following periods of volatility in the market price of their securities. Denison may in the future be the target of similar litigation. Securities litigation could result in substantial costs and damages and divert management’s attention and resources.

Dilution from further Share issuances could impact the value of a securityholder’s investment in Denison.

While active in exploring for new uranium discoveries in the Athabasca Basin region, Denison’s present focus is on advancing the Wheeler River project to a development decision, with the potential to become the next large scale uranium producer in Canada. Denison will require additional funds to further such activities.

Denison may sell additional debt or equity securities (including through the sale of securities convertible into Shares) to finance its exploration, evaluation, development, construction and other operations, acquisitions or other projects. Denison is authorized to issue an unlimited number of Shares. Denison cannot predict the size of future sales and issuances of debt or equity securities or the effect, if any, that future sales and issuances of debt or equity securities will have on the market price of the Shares. Sales or issuances of a substantial number of equity securities, or the perception that such sales could occur, may adversely affect prevailing market prices for the Shares. With any additional sale or issuance of equity securities, investors may suffer dilution of their voting power and it could reduce the value of their investment.

Lack of liquidity for Shares may negatively impact a securityholder’s investment and/or the Company’s exchange listings.

Shareholders of the Company may be unable to sell significant quantities of Shares into the public trading markets without a significant reduction in the price of their Shares, or at all. There can be no assurance that there will be sufficient liquidity of the Company’s Shares on the trading market, and that the Company will continue to meet the listing requirements of the TSX or the NYSE American or achieve listing on any other public listing exchange.

Interests of KEPCO and KHNP may not always be consistent with the interests of other securityholders.

Pursuant to the KHNP SRA, KHNP Canada is contractually entitled to representation on the Board. Provided KHNP Canada holds over 5% of the Shares, it is entitled to nominate one director for election to the Board at any shareholder meeting.

2024 ANNUAL INFORMATION FORM    92


KHNP Canada’s right to nominate a director may give KHNP Canada influence on decisions made by the Board. Although KHNP Canada’s director nominee will be subject to duties under the OBCA to act in the best interests of Denison as a whole, such director nominee is likely to be an employee of KHNP and he or she may give special attention to KHNP’s or KEPCO’s interests as indirect shareholders. The interests of KHNP and KEPCO, as indirect shareholders, may not always be consistent with the interests of other securityholders.

The KHNP SRA also includes provisions granting KHNP Canada a right of first offer for certain asset sales and the right to be approached to participate in certain potential acquisitions. The right of first offer and participation right of KHNP Canada may negatively affect Denison’s ability or willingness to entertain certain business opportunities, or the attractiveness of Denison as a potential party for certain business transactions. KEPCO’s large indirect shareholding block may also make Denison less attractive to third parties considering an acquisition of Denison if those third parties are not able to negotiate KEPCO or KHNP Canada’s support.

United States investors may not be able to obtain enforcement of civil liabilities against the Company.

The enforcement by investors of civil liabilities under the United States federal or state securities laws may be affected adversely by the fact that the Company is governed by the OBCA, that the majority of the Company’s officers and directors are residents of Canada, and that all, or a substantial portion, of their assets and the Company’s assets are located outside the United States. It may not be possible for investors to effect service of process within the United States on certain of its directors and officers or enforce judgments obtained in the United States courts against the Company or certain of the Company’s directors and officers based upon the civil liability provisions of United States federal securities laws or the securities laws of any state of the United States.

There is some doubt as to whether a judgment of a United States court based solely upon the civil liability provisions of United States federal or state securities laws would be enforceable in Canada against the Company or its directors and officers. There is also doubt as to whether an original action could be brought in Canada against the Company or its directors and officers to enforce liabilities based solely upon United States federal or state securities laws.

If the Company is characterized as a passive foreign investment company, U.S. holders may be subject to adverse U.S. federal income tax consequences.

U.S. investors should be aware that they could be subject to certain adverse U.S. federal income tax consequences in the event that the Company is classified as a ‘passive foreign investment company’ (“PFIC”) for U.S. federal income tax purposes. The determination of whether the Company is a PFIC for a taxable year depends, in part, on the application of complex U.S. federal income tax rules, which are subject to differing interpretations, and the determination will depend on the composition of the Company’s income, expenses and assets from time to time and the nature of the activities performed by the Company’s officers and employees. The Company may be a PFIC in one or more prior tax years, in the current tax year and in subsequent tax years. Prospective investors should carefully read the tax discussion in any applicable prospectus supplement for more information and consult their own tax advisors regarding the consequences of the Company being treated as a PFIC for U.S. federal income tax purposes, including the advisability of making certain elections that may mitigate certain possible adverse U.S. federal income tax consequences that may result in an inclusion in gross income without receipt of such income.

2024 ANNUAL INFORMATION FORM    93


As a foreign private issuer, the Company is subject to different U.S. securities laws and rules than a U.S. domestic issuer, which may limit the information publicly available to U.S. investors.

The Company is a foreign private issuer under applicable U.S. federal securities laws and, therefore, is not required to comply with certain of the periodic disclosure and current reporting requirements of the U.S. Exchange Act and related rules and regulations. As a result, the Company does not file the same reports that a U.S. domestic issuer would file with the SEC, although it will be required to file with or furnish to the SEC the continuous disclosure documents that the Company is required to file in Canada under Canadian securities laws. In addition, the Company’s officers, directors and principal shareholders are exempt from reporting holdings in the Company’s securities and the ‘short swing’ profit recovery provisions of Section 16 of the U.S. Exchange Act. Therefore, the Company’s securityholders may not know on as timely a basis when its officers, directors and principal shareholders purchase or sell securities of the Company as the reporting periods under the corresponding Canadian insider reporting requirements are longer. The Company is also exempt from Regulation FD, which prohibits issuers from making selective disclosures of material non-public information. In addition, as a foreign private issuer, the Company is exempt from the proxy rules under the U.S. Exchange Act. The Company also has the option to follow certain Canadian corporate governance practices, except to the extent that such laws would be contrary to U.S. securities laws, and provided that the Company discloses the requirements it is not following and describes the Canadian practices it follows instead. The Company may elect to follow home country practices in Canada with regard to certain corporate governance matters. As a result, the Company’s shareholders may not have the same protections afforded to shareholders of U.S. domestic companies that are subject to all corporate governance requirements.

The Company may lose its foreign private issuer status in the future, which could result in significant additional costs and expenses to the Company.

The Company may lose its foreign private issuer status if a majority of the Shares are owned of record in the United States and the Company fails to meet the additional requirements necessary to avoid loss of foreign private issuer status, which require that the majority of both its directors and executive officers are not U.S. citizens or residents, a majority of the Company’s assets are located outside the United States, and that its business be principally administered outside the United States. The regulatory and compliance costs to the Company under U.S. federal securities laws as a U.S. domestic issuer may be significantly more than the costs the Company incurs as a Canadian foreign private issuer eligible to use the multijurisdictional disclosure system. If the Company is not a foreign private issuer, it would not be eligible to use the multijurisdictional disclosure system or other foreign issuer forms and would be required to file periodic and current reports and registration statements on U.S. domestic issuer forms with the SEC, which are more detailed and extensive than the forms available to a foreign private issuer.

2024 ANNUAL INFORMATION FORM    94


Denison’s Securities

The Shares

The Company is entitled to issue an unlimited number of Shares. As of December 31, 2024, Denison had an aggregate of 895,713,101 Shares issued and outstanding, and 896,207,766 Shares are issued and outstanding as at the date hereof.

Shareholders are entitled to receive notice of, and to one vote per share at, every meeting of shareholders and to share equally in the assets of Denison remaining upon the liquidation, dissolution or winding up of Denison after the creditors of Denison have been satisfied.

Price Range and Trading Volume of Shares

The Shares trade on the TSX under the symbol “DML” and on the NYSE American under the symbol “DNN”. The following table sets forth, for the periods indicated, the reported high and low end of day sales prices and aggregate volume of trading of the Shares on the TSX and NYSE American during the year ended December 31, 2024.

    

    

    

    

    

    

Volume 

High 

Low 

Volume 

High (US$) 

Low (US$) 

(Millions) 

(CAD$) 

(CAD$) 

(Millions) 

NYSE 

NYSE 

NYSE 

Month

TSX

TSX

TSX

American

American

American

January

$

2.80

$

2.22

 

48.7

$

2.03

$

1.66

 

290

February

$

2.86

$

2.36

 

33.8

$

2.14

$

1.76

 

301

March

$

2.65

$

2.40

 

30.8

$

1.96

$

1.79

 

263

April

$

3.00

$

2.70

 

37.2

$

2.22

$

1.97

 

383

May

$

3.31

$

2.79

 

36.7

$

2.42

$

2.04

 

386

June

$

3.23

$

2.71

 

25.4

$

2.37

$

1.99

 

278

July

$

3.08

$

2.56

 

40.4

$

2.28

$

1.85

 

346

August

$

2.42

$

2.03

 

60.0

$

1.76

$

1.48

 

379

September

$

2.53

$

1.94

 

50.4

$

1.88

$

1.44

 

358

October

$

3.27

$

2.54

 

50.0

$

2.38

$

1.85

 

473

November

$

3.37

$

2.85

 

43.8

$

2.39

$

2.04

 

465

December

$

3.26

$

2.61

 

32.8

$

2.32

$

1.80

 

413

Source: Bloomberg

The trading of the Shares on the TSX and the NYSE American do not represent all trading in the Shares, and significant volumes of trading may be facilitated through other platforms.

2024 ANNUAL INFORMATION FORM    95


Prior Sales

During the year ended December 31, 2024, the Company issued the following securities pursuant to the Company’s Option Plan and Share Unit Plan, as applicable:

Stock Options:

    

Options

    

Exercise Prices 

Date of Issuance

 (#)

($)

March 4, 2024

1,485,000

$

2.61

May 10, 2024

 

56,000

$

2.92

August 12, 2024

 

77,000

$

2.04

TOTAL

 

1,618,000

 

  

Share Units:

    

Restricted Share Units 

    

Performance Share Units 

Date of Issuance

(#)

(#)

March 4, 2024

1,690,000

May 10, 2024

 

38,000

 

August 12, 2024

 

139,000

 

November 11, 2024

 

11,000

 

TOTAL

 

1,878,000

 

Dividends

Shareholders are entitled to receive dividends if, as and when declared by the Board of Directors. The Company is restricted under its Credit Facility from paying dividends, and the directors are focused on dedicating cash flow to reinvestment in the business of the Company. Accordingly, no dividends have been declared to date.

2024 ANNUAL INFORMATION FORM    96


Denison’s Directors & Management

Denison’s Directors

The following table sets out the names and the provinces and countries of residence of each of the directors of Denison as of the date hereof, their respective positions and offices held with Denison and their principal occupations during the five preceding years. The following table also identifies the members of each committee of the Board of Directors.

Name and Province and

Principal Occupation and Employment for

Country of Residence

    

Past Five Years

    

Director Since(1)

Jinsu Baik
Gyeongsangbuk-do, Korea

General Manager of the Nuclear Fuel Cycle Management section of KHNP; prior: has held various positions at KHNP.

2025

David Cates
Ontario, Canada

President and Chief Executive Officer of the Company since 2015.

2018

Ken Hartwick(3)
Ontario, Canada

Corporate Director; retired in 2024 from position of President & CEO of Ontario Power Generation since 2019.

2025

David Neuburger(3,8,10)
Saskatchewan, Canada

Corporate Director since 2019; prior: mining executive with Kinross Gold Corporation and Cameco Corporation.

2021

Laurie Sterritt(4, 9)
British Columbia, Canada

CEO and Managing Partner of Pathways Executive Search; prior: Managing Director at Leaders International from 2018 to 2023.

2022

Jennifer Traub(5, 7)
Chair of the Board
British Columbia, Canada

Partner in the Securities Group at Cassels Brock & Blackwell LLP since 2000 and serves as Co-Chair of the firm’s Mining Group.

2021

Patricia M. Volker(2, 6)
Ontario, Canada

Corporate Director since 2016; prior: senior positions with the Chartered Professional Accountants of Ontario.

2018

Notes:

(1)The term of office of each of the directors of Denison will expire at the annual & special meeting of the shareholders currently scheduled to be held on May 12, 2025.
(2)Chair, Audit Committee
(3)Member, Audit Committee
(4)Chair, Corporate Governance and Nominating Committee
(5)Member, Corporate Governance and Nominating Committee
(6)Chair, Compensation Committee
(7)Member, Compensation Committee
(8)Chair, Environment, Health, Safety & Sustainability Committee
(9)Member, Environment, Health, Safety & Sustainability Committee
(10)Chair, Technical Committee
(11)Member, Technical Committee

2024 ANNUAL INFORMATION FORM    97


Denison’s Executive Officers

The following table sets out the names and the provinces or states and countries of residence of each of the executive officers of Denison as of the date hereof, their respective positions and offices held with Denison and their principal occupations during the five preceding years.

Name and Province and

Country of Residence

    

Position with Denison and Employment for Past Five Years

David Cates
Ontario, Canada

President and Chief Executive Officer since 2015; with Denison in different positions since 2008.

Elizabeth Sidle
Ontario, Canada

Vice President Finance and Chief Financial Officer; with Denison in different positions since 2016.

Kevin Himbeault
Saskatchewan, Canada

Vice President Operations; with Denison in different positions since 2022; prior: Operations Manager at the Key Lake mill for Cameco since 2015.

Geoff Smith
Ontario, Canada

Vice President Corporate Development & Commercial since 2023; prior: President & Chief Operating Officer at Carbon Streaming Corporation and Managing Director in Global Mining & Metals at Scotiabank.

Mary Jo Smith
Ontario, Canada

Vice President Human Resources; with Denison in different positions since 2007.

Chad Sorba
Saskatchewan, Canada

Vice President Technical Services & Project Evaluation; with Denison in different positions since 2007.

Janna Switzer
Saskatchewan, Canada

Vice President Environment, Sustainability & Regulatory, with Denison in different positions since 2020; prior: Senior Advisor with Rio Tinto Exploration.

Amanda Willett
British Columbia, Canada

Vice President Legal and Corporate Secretary; with Denison in different positions since 2016.

Andy Yackulic
Saskatchewan, Canada

Vice President Exploration; with Denison in different positions since 2020; prior: Vice President, Exploration with Axiom Group.

The directors and executive officers of Denison, as a group, beneficially own, or control or direct, directly or indirectly, 3,482,468 Shares, or less than one percent of the Shares as of the date of this AIF. No single director or officer beneficially owns or controls or directs, directly or indirectly, one percent or more of the Shares as of the date of this AIF. The information as to Shares beneficially owned or directed by the directors and officers, not being within the knowledge of the Company, has been furnished by each such individual.

Cease Trade Orders, Bankruptcies, Penalties or Sanctions

Other than as referred to below, no director or officer of the Company:

1.is, as at the date of this AIF, or has, within the previous ten year period, been a director or executive officer of a company (including Denison) that:
a.was subject to a cease trade or similar order or an order that denied the relevant company access to any exemption under securities legislation that was in effect for a period of more than 30 consecutive days that was issued (A) while that person was acting in such capacity or (B) after that person ceased to act in such capacity but which resulted from an event that accrued while that person was acting in that capacity; or
b.became bankrupt, made a proposal under any legislation relating to bankruptcy or insolvency or was subject to or instituted any proceedings, arrangement or compromise with creditors or had a receiver, receiver manager or trustee appointed to hold its assets (A) while that person was acting in such capacity or (B) within a year of that person ceasing to act in such capacity, or
2.has, within the previous ten year period, become bankrupt, made a proposal under any legislation relating to bankruptcy or insolvency, or become subject to or instituted any proceedings, arrangement or compromise with creditors, or had a receiver, receiver manager or trustee appointed to hold such person’s assets; or

2024 ANNUAL INFORMATION FORM    98


3.is, or has been, subject to any penalties or sanctions (i) imposed by a court relating to securities legislation or by a securities regulatory authority or has entered into a settlement agreement with a securities regulatory authority, or (ii) imposed by a court or regulatory body that would likely be considered important to a reasonable security holder in making an investment decision.

Conflicts of Interest

Some of Denison’s directors and officers are also directors and/or officers of other natural resource companies and, consequently, there exists the possibility for such directors and officers to be in a position of conflict relating to any future transactions or relationships between the Company and such other companies or common third parties. However, the Company is unaware of any such pending or existing conflicts between these parties. Any decision made by any of such directors and officers involving the Company are made in accordance with their duties and obligations to deal fairly and in good faith with the Company and such other companies and their obligations to act in the best interests of Denison’s shareholders. In addition, each of the directors of the Company discloses and refrains from voting on any matter in which such director may have a conflict of interest.

None of the present directors or senior officers of the Company, and no associate or affiliate of any of them, has any material interest in any transaction of the Company or in any proposed transaction which has materially affected or will materially affect the Company.

One of Denison’s directors, Mr. Baik, is employed by KHNP, the parent corporation of KHNP Canada. The Company and KHNP Canada are parties to the KHNP SRA, which may present a conflict of interest for Mr. Baik. The KHNP SRA provides KHNP Canada with a right of first offer for certain asset sales and the right to be approached to participate in certain potential acquisitions being considered by Denison. While the Company is not aware of a pending or existing conflict of interest with Mr. Baik as of the date hereof, the interests of KEPCO, KHNP and KHNP Canada as shareholders of Denison and their business relationships with Denison may place Mr. Baik in a position of conflict as a director of the Company in the future.

Interest of Management and Others in Material Transactions

Other than as disclosed in this AIF, no director or executive officer of Denison, no person or company that beneficially owns, controls or directs, indirectly or directly, more than 10% of the Shares, and no associate or affiliate of any of them, has or has had, within the three most recently completed financial years or during the current financial year, any material interest, direct or indirect, in any transaction which materially affects or is reasonably expected to materially affect Denison.

Standing Committees of the Board

The Audit Committee

The Audit Committee of the Company’s Board of Directors is principally responsible for:

recommending to the Company’s Board of Directors the external auditor to be nominated for election by the Company’s shareholders at each annual general meeting and negotiating the compensation of such external auditor;
overseeing the work of the external auditor;
reviewing the Company’s annual and interim financial statements, its MD&A in respect thereof and press releases regarding earnings before they are reviewed and approved by the Board of Directors and publicly disseminated by the Company;
reviewing the Company’s financial reporting procedures for the Company’s public disclosure of financial information extracted or derived from its financial statements;
overseeing the Company’s practices with respect to the identification and management of financial reporting, financial compliance and related risks; and

2024 ANNUAL INFORMATION FORM    99


overseeing other areas of risk for the Company, including related-party transactions, conflicts, internal audit and cyber security risks.

The Company’s Board of Directors has adopted an Audit Committee mandate/terms of reference (the “Mandate”) which sets out the Audit Committee’s mandate, organization, powers and responsibilities. The complete Mandate is attached as Schedule A to this AIF.

Below are the details of each Audit Committee member, including his or her name, whether she or he is independent and financially literate as such terms are defined under National Instrument 52-110 - Audit Committees of the Canadian Securities Administrators (“NI 52-110”) and his or her education and experience as it relates to the performance of his or her duties as an Audit Committee member. All three Audit Committee members have “financial expertise” within the meaning of the U.S. Sarbanes-Oxley Act of 2002, as amended, and are financially literate under NI 52-110. The qualifications and independence of each member is discussed.

    

    

Financially

    

Education & Experience Relevant to

Director

Independent

Literate(1)

Performance of Audit Committee Duties

Patricia Volker,
Chair of the Committee

Yes

Yes

Chartered Professional Accountant, Chartered Accountant,
Certified Management Accountant
B.Sc.
Served in various capacities in the accounting profession during a 30+ year career
Served for over 17 years in various positions at the Chartered Professional Accountants of Ontario, most recently as the Director of Public Accounting and Special Projects
Serves on and chairs private and public company audit and/or finance committees
Holds the Institute of Corporate Directors, Director designation

Kenneth Hartwick

Yes

Yes

Holds a Fellowship of Chartered Professional Accountants
Chartered Professional Accountant
Held senior positions with financial oversight, including President and Chief Executive Officer of Ontario Power Generation (2019 to 2024)
Serves on other public company audit committees
Holds the Institute of Corporate Directors, Director designation

David Neuburger

Yes

Yes

Completed Financial Accounting and Managerial Accounting courses as part of a Masters of Business Administration (MBA) Program
Disclosure Committee experience with Cameco, including review of quarterly and annual financial statements and management’s discussion & analysis
Served on another public company audit committee

Notes:

(1)To be considered financially literate, a member of the Committee must have the ability to read and understand a set of financial statements that present a breadth and level of complexity of accounting issues that are generally comparable to the breadth and complexity of the issues that can reasonably be expected to be raised by the Company’s financial statements.

2024 ANNUAL INFORMATION FORM    100


The following table discloses the fees billed to the Company by its independent auditors during the last two fiscal years.

Financial Year

    

    

 Audit-Related

    

    

All Other

Ending (1)

Audit Fees2)

Fees(3)

Tax Fees(4)

Fees(5)

December 31, 2023

$

531,510

$

33,170

$

39,620

 

Nil

December 31, 2024

$

585,110

$

34,780

$

99,270

 

Nil

Notes:

(1)These amounts include accruals for fees billed outside the period to which the services related.
(2)The aggregate fees billed for audit services of the Company’s consolidated financial statements, including services normally provided by an auditor for statutory or regulatory filings or engagements and other services only the auditor can reasonably provide. The audit fees in 2023 and 2022 include fees related to reviews of interim consolidated financial statements (2024: $123,250; 2023: $105,930) and the extensive work required of the auditor to support, and conduct consent procedures in connection with, the Company’s various equity issuances (2024: $nil; 2023: $96,300).
(3)The aggregate fees billed for specified audit procedures, assurance and related services that are reasonably related to the performance of the audit or review of the Company’s financial statements and are not disclosed in the audit fees column. Audit-related fees in 2024 and 2023 were billed for certain specified procedures engagements and the audit of certain subsidiary financial statements.
(4)The aggregate fees billed for tax compliance, tax advice, and tax planning services, such as transfer pricing and tax return preparation.
(5)The aggregate fees billed for professional services other than those listed in the other three columns.

Since the commencement of the Company’s most recently completed financial year, there has not been a recommendation of the Audit Committee to nominate or compensate an auditor which was not adopted by the Company’s Board of Directors.

The Audit Committee has adopted specific policies and procedures for the engagement of non-audit services as described in Section D of the Mandate.

Other Board Committees

The Board currently has four standing committees in addition to the Audit Committee: (1) Corporate Governance and Nominating Committee, (2) Compensation Committee, (3) Environment, Health, Safety and Sustainability Committee, and (4) Technical Committee. Each standing committee of the Board operates according to its mandate, which is approved by the Board and sets out the committee’s duties and responsibilities. A discussion of each committee and its composition can be found in the most recent management information circular prepared in connection with the Company’s shareholder meeting (“Circular”), and copies of the standing committee mandates are available at www.denisonmines.com.

Corporate Governance

As a Canadian reporting issuer with its Shares listed on the TSX, Denison has in place a system of corporate governance practices which is responsive to applicable Canadian requirements, including National Policy 58-201 - Corporate Governance Guidelines of the Canadian Securities Administrators (the “Guidelines”). Denison’s corporate governance practices meet or exceed the Guidelines and all other applicable Canadian requirements. Reference is made to the Corporate Governance Practices section of the Circular, which contains a description of the Company’s system of corporate governance practices with reference to the Guidelines.

Denison is classified as a foreign private issuer under U.S. securities law and its Shares are also listed on the NYSE American. Pursuant to the rules of the NYSE American, a foreign private issuer is permitted to follow home country practice except with respect to certain rules, with which Denison complies.

2024 ANNUAL INFORMATION FORM    101


Legal and Regulatory Proceedings

The Company was not a party to, and none of the Company’s property was the subject of, any material legal proceedings in 2024.

The Company and, in one instance, certain of Denison’s officers are party to formal proceedings with JCU and UEX in connection with the parties’ relationships as shareholders or directors of JCU and/or joint venture participants in the WRJV largely stemming from a dispute over rights of access to certain WRJV confidential information under the terms of the WRJV Agreement. By necessary majority of the WRJV Management Committee, the disclosure to UEX of such confidential WRJV information was deemed not to be in the best interests of the WRJV and was denied, in accordance with the terms of the WRJV Agreement.

In August 2023, UEX filed an Originating Application in the Court of King’s Bench for Saskatchewan, seeking injunctive relief and specific performance against Denison in connection with its operation of the WRJV (the delivery to UEX of certain confidential WRJV documentation prior to the approval by the WRJV Management Committee of an Approved Development Program for the Phoenix project). The application was heard by the Court and adjourned indefinitely. Denison disputes UEX’s standing to bring such claim and denies almost all alleged facts and claims. The claim is still outstanding.

In November 2023, UEX, as operator of JCU, filed a Statement of Claim with the Court of King’s Bench for Saskatchewan, seeking a declaration that Denison is in breach of the WRJV Agreement by failing to disclose that same requested confidential information. Denison denies almost all alleged facts and claims. In addition, Denison disputes JCU’s standing to bring such claim without authorization of the JCU Board of Directors. The claim is still outstanding.

In October 2024, the WRJV Management Committee approved the findings and recommendations of the Phoenix FS, which became an ADP under the WRJV Agreement, providing the WRJV’s approval for development and construction of Phoenix in accordance with the Phoenix FS. At the October 2024 meeting of the WRJV Management Committee, JCU (at the direction of its operator, UEX) abstained from voting on the ADP. It is Denison’s position that such abstention represents non-support for the ADP. In accordance with the terms of the WRJV Agreement, non-support of the ADP by a participant means that such participant is no longer liable for its cost share of WRJV expenditures. The WRJV Agreement further requires that a participant who does not support an ADP must sell or transfer their interest. UEX, as operator of JCU, has notified Denison that it does not agree that JCU’s abstention from the ADP vote should be taken as non-support for the ADP and the sale or transfer of JCU’s participating interest in the WRJV has not yet occurred. The matter has not yet been resolved.

In March 2025, UEX filed a Petition to the Court in the Supreme Court of British Columbia, seeking leave for UEX to bring a derivative action, in the name of and on behalf of JCU against Denison, to advance its claims for the disclosure of certain WRJV confidential information and to challenge the consequences of JCU’s abstention from voting on the ADP. In that same application, UEX has claimed that Denison’s nominees to the JCU Board of Directors, Mr. Cates and Ms. Willett, have acted in a manner that is oppressive to UEX and violates UEX’s reasonable expectations as a shareholder of JCU and an indirect party to the WRJV Agreement. Denison, Mr. Cates, and Ms. Willett disagree with almost all alleged facts and claims, and a formal response will be made.

Denison considers these disputes with UEX and JCU to be vexatious, and has not currently identified them as material to the Company or its properties.

2024 ANNUAL INFORMATION FORM    102


Material Contracts

Reference is made to the material contracts which have been filed by Denison with the Canadian securities regulatory authorities on the SEDAR+ website at www.sedarplus.ca.

Below are the particulars of each contract, other than those entered into in the ordinary course of business, that is material to Denison and that was entered into between January 1, 2024 and the date hereof or was entered into before that date but is still in effect:

1.The following agreements executed in connection with the Ecora Transaction:
a.The loan agreement between DMI and SPV dated January 31, 2017 with respect to the Ecora Loan;
b.The loan agreement between SPV and Ecora dated January 31, 2017 with respect to the SPV Loan;
c.The performance guarantee by Denison as guarantor in favour of the SPV as beneficiary and Ecora as permitted assignee, pursuant to which Denison has agreed to guarantee the performance of DMI’s obligations to SPV under the SPV Loan, which guarantee has been assigned by SPV in favour of Ecora;
d.The streaming agreement between DMI and Centaurus dated January 31, 2017 with respect to the Stream Arrangement; and
e.The performance guarantee by Denison as guarantor in favour of Centaurus as beneficiary, pursuant to which Denison has agreed to guarantee the performance of DMI’s obligations to Centaurus under the Stream Arrangement.
2.The Reclamation Funding Agreement made as of the 21st day of December 1995 among Denison Mines Limited (“DML”), Her Majesty the Queen in Right of Canada (the “Government of Canada”) and Her Majesty the Queen in Right of the Province of Ontario (the “Government of Ontario”) as amended by amending agreements made as of the 11th day of April 1997 and the 25th day of February 1999 among DML (now DMI), the Government of Canada and the Government of Ontario and further amended by an assignment and novation agreement made as of the 29th day of December, 2003 among Denison Energy, DMI, the Government of Canada and the Government of Ontario.

According to the Reclamation Funding Agreement, the Company is required to maintain funds in an Environmental Trust sufficient for the succeeding six years of the estimated reclamation and on-going care and monitoring expenditures for the Company’s closed Elliot Lake mining facility.

3.The KHNP SRA dated September 19, 2017 between the Company and KHNP Canada.

The KHNP SRA provides for a long-term collaborative business relationship between the parties, replacing the strategic relationship agreement made as of June 15, 2009 among the Company, KEPCO and KEPCO Canada Uranium Investment Limited Partnership. Under the KHNP SRA, KHNP Canada is entitled to the nomination of one Board representative, provided that KHNP Canada’s shareholding percentage stays above 5%.

The KHNP SRA also provides that if Denison intends to sell an interest in certain of its substantial assets, it will first notify KHNP Canada of each such proposed sale and provide KHNP Canada with a 30-day right of first offer to allow KHNP Canada to purchase the interest in the asset that Denison proposes to sell. The KHNP SRA provides that Denison will allow KHNP Canada to participate in potential purchases of certain assets, including a mill facility, a producing mine or a mineral resource for which a production feasibility study has been completed, which Denison plans to pursue with a co-investor. KHNP Canada’s ability to purchase will not be available where Denison and KHNP Canada cannot agree on terms within a reasonable time or where their involvement would adversely affect Denison’s ability to pursue an investment opportunity.

2024 ANNUAL INFORMATION FORM    103


The right of first offer and co-investment rights are subject to pre-existing contractual commitments and do not apply to certain pre-existing transactions. KHNP Canada is also entitled to subscribe for additional Shares, in order to maintain or increase its shareholding percentage in Denison to thresholds which are relevant to its rights under the KHNP SRA, in circumstances where Denison completes a public offering or broadly distributed private placement to raise proceeds of greater than $10 million.

Denison is entitled to terminate the KHNP SRA if KHNP Canada’s shareholding percentage in Denison drops below 5% and stays below 5% for 60 days following delivery of a notice to that effect by Denison to KHNP Canada or if Denison completes an Extraordinary Transaction, as defined in the KHNP SRA.

4.The Fourth Amended and Restated Credit Facility dated January 30, 2015, and all subsequent amendments including the Twelfth Amending Agreement dated December 18, 2024.

2024 ANNUAL INFORMATION FORM    104


Names and Interests of Experts

The Company’s Independent Registered Public Accounting Firm is KPMG LLP, Chartered Professional Accountants, Licensed Public Accountants, who have issued an independent auditor’s report dated March 13, 2025 in respect of Denison’s consolidated financial statements as at December 31, 2024 and 2023, and for the two years then ended, and an independent auditor’s report dated March 13, 2024 on the effectiveness of the Company’s internal control over financial reporting as at December 31, 2024. KPMG have confirmed that they are independent with respect to the Company within the meaning of the relevant rules and related interpretations prescribed by the relevant professional bodies in Canada and any applicable legislation or regulations, and also that they are independent accountants with respect to the Company under all relevant US professional and regulatory standards.

Chad Sorba, P.Geo., Denison’s Vice President Technical Services and Project Evaluation, who is a “Qualified Person” within the meaning of this term in NI 43-101, has reviewed and approved the disclosure of a scientific or technical nature pertaining to the Company’s mineral projects and verified the data disclosed therein. To the knowledge of Denison, Chad Sorba is the registered or beneficial owner, directly or indirectly, of less than one percent of the outstanding Shares.

Wood was retained as the lead consulting firm for the preparation of the Wheeler Report dated June 23, 2023. Wood and its team were independent in accordance with the requirements of NI 43-101. To the knowledge of Denison as of the date hereof, Wood, and its partners, employees and consultants who participated in the preparation of the aforementioned reports, or who were in a position to influence the outcome of such reports, are the registered or beneficial owner, directly or indirectly, of less than one percent of the outstanding Shares.

2024 ANNUAL INFORMATION FORM    105


Additional Information

Additional information regarding the Company is available on the SEDAR+ website at www.sedarplus.ca. Further information concerning the Company, including directors’ and officers’ remuneration and indebtedness, principal holders of the Company’s securities, options to purchase securities and interests of insiders in material transactions, where applicable, is contained in the management information circular for the Company’s most recent meeting of shareholders. Additional financial information is provided in the Company’s audited consolidated financial statements and MD&A for the financial year ended December 31, 2024.

A copy of this AIF, as well as the Circular and such other information and documentation that the Company makes available via SEDAR+, can be found at www.sedarplus.ca. In addition, certain of this information is distributed to shareholders in connection with Denison’s Annual General Meeting of Shareholders. The Company will provide any of the foregoing documents subject to its rights to require people who are not security holders of the Company to pay a reasonable charge. Copies of these documents may be obtained by writing to:

Denison Mines Corp.

1100 – 40 University Avenue

Toronto, Ontario, M5J 1T1

Telephone:

(416) 979-1991

Facsimile:

(416) 979-5893

Email: info@denisonmines.com

2024 ANNUAL INFORMATION FORM    106


Schedule A

Graphic

Audit Committee Mandate and Charter

A.

Composition of the Committee

(1)The Board shall appoint annually from among its members at the first meeting of the Board following the annual meeting of the shareholders a committee to be known as the Audit Committee (the “Committee”) to be composed of three (3) directors or such other number not less than three (3) as the Board may from time to time determine.
(2)Any member of the Committee may be removed or replaced at any time by the Board. Any member of the Committee ceasing to be a director or ceasing to qualify under A(3) below shall cease to be a member of the Committee. Subject to the foregoing, each member of the Committee shall hold office as such until the next annual appointment of members to the Committee after his or her election. Any vacancy occurring in the Committee shall be filled at the next meeting of the Board.
(3)Each member of the Committee shall:
(a)be a member of the Board;
(b)not be an officer or employee of the Company or any of its affiliates;
(c)be an unrelated director as defined in the Toronto Stock Exchange (the “TSX”) Corporate Governance Guidelines (“TSX Guidelines”) as the same may be amended from time to time;
(d)satisfy the independence requirements applicable to members of audit committees under each of Multilateral Instrument 52-110 – Audit Committees of the Canadian Securities Administrators (“M1 52-110”), Rule 10A-3(b)(1)(ii) of the United States Securities and Exchange Commission, and any other applicable laws and regulations, as the same may be amended from time to time (with the TSX Guidelines, “Applicable Laws”); and
(e)satisfy the financial literacy requirements prescribed by Applicable Laws.
(4)A majority of the Committee shall constitute a quorum.
(5)The Committee shall elect annually a chairperson from among its members.

B.

Purpose

(1)The Committee’s purpose is to assist the Board in its supervision of the management of the business and affairs of the Company through oversight of:
(a)the integrity of the Company’s financial statements, Management’s Discussion and Analysis (“MD&A”) and other financial reporting;
(b)the integrity of the Company’s internal control and management information systems;

2024 ANNUAL INFORMATION FORM    A-1


(c)the Company’s compliance with all applicable laws, rules, regulations, policies and other requirements of governments, regulatory agencies and stock exchanges relating to accounting matters and financial disclosure;
(d)the Company’s practices with respect to the identification and management of financial reporting, financial compliance and related risks;
(e)the auditor’s qualifications and activities;
(f)communication among the auditor, management and the Board; and
(g)such other matters as are determined by the Board from time to time.

C.Committee Resources

(1)The Committee shall have direct channels of communication with the Company’s auditor to discuss and review specific issues as appropriate.
(2)The Committee, or any member of the Committee with the approval of the Committee, may retain at the expense of the Company such independent legal, accounting (other than the auditor) or other advisors on such terms as the Committee may consider appropriate and shall not be required to obtain the approval of the Board in order to retain or compensate any such advisors.
(3)The Committee shall have unrestricted access to Company personnel and documents and shall be provided with all necessary funding and other resources to carry out its responsibilities.

D.Committee Responsibilities

(1)The responsibilities of the Committee shall be to:

(a)with respect to financial accounting matters:
(i)review with management and the external auditors the annual consolidated financial statements, MD&A and press release announcing annual financial results of operations before making recommendations to the Board relating to approval of such documents;
(ii)review with management and the external auditors interim financial statements, MD&A and press release announcing interim financial results of operations before making recommendations to the Board relating to approval of such documents;
(iii)review and discuss with management and the external auditors all public disclosure documents containing audited or unaudited financial information including: any Prospectus; the Annual Report; interim unaudited reports; and any material change report pertaining to the Company’s financial matters. The Committee will review the consistency of the foregoing documents with facts, estimates or judgments contained in the audited or unaudited financial statements;
(iv)satisfy itself that adequate procedures are in place for the review of the Company’s disclosure of financial information extracted or derived from the Company’s financial statements, other than the Company’s financial statements, MD&A and earnings press releases, and shall periodically assess the adequacy of those procedures;

2024 ANNUAL INFORMATION FORM    A-2


(v)prior to the completion of the annual audit, and at any other time deemed advisable by the Committee, review and discuss with management and the auditor the quality of the Company’s accounting policies and financial statement presentation, including, without limitation, the following:
1.all critical accounting policies and practices to be used, including, without limitation, the reasons why certain estimates or policies are or are not considered critical and how current and anticipated future events may impact those determinations as well as an assessment of any proposed modifications by the auditors that were not made;
2.all alternative accounting treatments for policies and practices that have been discussed by management and the auditors; and
3.other material written communications between the auditor and management, including, without limitation, any management letter, schedule of unadjusted differences, the management representation letter, report on internal controls, as well as the engagement letter and the independence letter;
(vi)review annually the accounting principles and practices followed by the Company and any changes in the same as they occur;
(vii)review new accounting principles of the Chartered Professional Accountants of Canada and the International Accounting Standards Board which would have a significant impact on the Company’s financial reporting as reported to the Committee by management;
(viii)review the status of material contingent liabilities as reported to the Committee by management;
(ix)review potentially significant tax problems as reported to the Committee by management; and
(x)review any errors or omissions in the current or prior year’s financial statements which appear material as reported to the Committee by management;
(b)with respect to the external auditors:
(i)be directly responsible for recommending the appointment of the auditor, the auditor’s compensation, retention and termination and for oversight of the work of the auditor (including, without limitation, resolution of disagreements between management and the auditor regarding financial reporting) for the purpose of preparing or issuing an audit report or performing other audit, review or services for the Company;
(ii)approve, prior to the auditor’s audit, the auditor’s audit plan (including, without limitation, staffing), the scope of the auditor’s review and all related fees;
(iii)satisfy itself as to the independence of the auditor. The Committee shall pre-approve any non-audit services (including, without limitation, fees therefor) provided to the Company or its subsidiaries by the auditor or any auditor of any such subsidiary and shall consider whether these services are compatible with the auditor’s independence, including, without limitation, the nature and scope of the specific non-audit services to be performed and whether the audit process would require the auditor to review any advice rendered by the auditor in connection with the provision of non-audit services. The Committee shall not allow the auditor to render any non-audit services to the Company or its subsidiaries that are prohibited by Applicable Law; and
(iv)review and approve the Company’s policies concerning the hiring of employees and former employees of the Company’s auditor or former auditor.

2024 ANNUAL INFORMATION FORM    A-3


(c)with respect to internal controls:
(i)oversee management’s design, testing and implementation of the Company’s internal controls and management information systems and review the adequacy and effectiveness thereof.
(d)with respect to concerns and complaints:
(i)establish procedures for:
1.the receipt, retention and treatment of complaints received by the Company regarding accounting, internal accounting controls or auditing matters; and
2.the confidential, anonymous submission by employees of the Company of concern regarding questionable accounting or auditing matters.
(e)with respect to ethics:
(i)be responsible for oversight and enforcement of the Code of Ethics for the Chief Executive Officer, Senior Financial Officers and Other Officers of the Company, subject to the supervision of the Board.
(f)with respect to general audit matters:
(i)inquire of management and the external auditors as to any activities that may or may not appear to be illegal or unethical;
(ii)review with management, the operations analyst and the external auditors any frauds reported to the Audit Committee;
(iii)review with the external auditors the adequacy of staffing for accounting and financial responsibilities; and
(iv)report and make recommendations to the Board as the Committee considers appropriate.
(g)with respect to general risk matters:
(i)review and monitor all related party transactions which may be entered into by the Company;
(ii)approve, or disapprove, material contracts where the Board determines it has a conflict;
(iii)review, at least annually, the management of the Company’s privacy and cyber security risk exposure and the policies, procedures and mitigation plans in place to protect the security and integrity of the Company’s information systems and data
(iv)receive reports from the Disclosure Committee pursuant to the Company’s Disclosure Policy, and review and recommend to the Board of Directors the members of the Disclosure Committee from time to time and where a vacancy occurs at any time in the membership of the Disclosure Committee; and
(v)review with management, at least annually, the Company’s policies and practices respecting insurance.
(2)In addition, the Board may refer to the Committee such matters and questions relating to the Company as the Board may from time to time see fit.

2024 ANNUAL INFORMATION FORM    A-4


(3)Any member of the Committee may require the auditors to attend any or every meeting of the Committee.

E.Meetings

(1)The times of and the places where meetings of the Audit Committee shall be held and the calling of and procedure at such meetings shall be determined from time to time by the Committee, provided however that the Committee shall meet at least quarterly, and the Committee shall maintain minutes or other records of its meetings and activities. Notice of every such meeting to be given in writing not less than five (5) days prior to the date fixed for the meeting, and shall be given to the auditors of the Company, that the auditors shall be entitled to attend and be heard thereat. Meetings shall be convened whenever requested by the auditors, the operations analyst or any member of the Audit Committee in accordance with the Ontario Business Corporations Act.
(2)As part of each meeting of the Committee at which it recommends that the Board approve the financial statements of the Company, and at such other times as the Committee deems appropriate, the Committee shall meet separately with the auditor to discuss and review specific issues as appropriate.

F.

Evaluation of Charter and Mandate

(1)On at least an annual basis, the Committee shall review and assess the adequacy of this Charter and Mandate and recommend any proposed changes to the Board of Directors.
(2)All prior resolutions of the Board relating to the constitution and responsibilities of the Audit Committee are hereby repealed.

2024 ANNUAL INFORMATION FORM    A-5


Schedule B

Glossary of Technical Terms

Note: The terms related to Mineral resources and mineral reserves presented herein are as defined in “CIM DEFINITION STANDARDS on Mineral Resources and Mineral Reserves” prepared by the CIM Standing Committee on Reserve Definitions, adapted by CIM Council, May 10, 2014.

eU3O8 or eU

This term refers to equivalent U3O8 grade derived from the downhole logging of drill holes using a calibrated total gamma probe.

Feasibility Study

A Feasibility Study is a comprehensive technical and economic study of the selected development option for a mineral project that includes appropriately detailed assessments of applicable Modifying Factors together with any other relevant operational factors and detailed financial analysis that are necessary to demonstrate, at the time of reporting, that extraction is reasonably justified (economically mineable). The results of the study may reasonably serve as the basis for a final decision by a proponent or financial institution to proceed with, or finance, the development of the project. The confidence level of the study will be higher than that of a Pre-Feasibility Study.

Historical Estimate

A historical estimate means an estimate of the quantity, grade or metal or mineral content of a deposit that an issuer has not verified as a current mineral resource or mineral reserve, and which was prepared before the issuer acquiring, or entering into an agreement to acquire, an interest in the property that contains the deposit.

Indicated Mineral Resource

An indicated mineral resource is that part of a mineral resource for which quantity, grade or quality, densities, shape and physical characteristics, can be estimated with a level of confidence sufficient to allow the appropriate application of technical and economic parameters, to support mine planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough for geological and grade continuity to be reasonably assumed.

Inferred Mineral Resource

An inferred mineral resource is that part of a mineral resource for which quantity and grade or quality can be estimated on the basis of geological evidence and limited sampling and reasonably assumed, but not verified, geological and grade continuity. The estimate is based on limited information and sampling gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes.

Measured Mineral Resource

A measured mineral resource is that part of a mineral resource for which quantity, grade or quality, densities, shape, and physical characteristics are so well established that they can be estimated with confidence sufficient to allow the appropriate application of technical and economic parameters, to support production planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough to confirm both geological and grade continuity.

2024 ANNUAL INFORMATION FORM    B-1


Mineral Reserve

A mineral reserve is the economically mineable part of a measured or indicated mineral resource demonstrated by at least a Preliminary Feasibility Study. This Study must include adequate information on mining, processing, metallurgical, economic and other relevant factors that demonstrate, at the time of reporting, that economic extraction can be justified. A mineral reserve includes diluting materials and allowances for losses that may occur when the material is mined.

Mineral Resource

A mineral resource is a concentration or occurrence of diamonds, natural solid inorganic material, or natural solid fossilized organic material including base and precious metals, coal, and industrial materials in or on the Earth’s crust in such form and quantity and of such a grade or quality that it has reasonable prospects for economic extraction. The location, quantity, grade, geological characteristics and continuity of a mineral resource are known, estimated or interpreted from specific geological evidence and knowledge.

Modifying Factors

Modifying Factors are considerations used to convert Mineral Resources to Mineral Reserves. These include, but are not restricted to, mining, processing, metallurgical, infrastructure, economic, marketing, legal, environmental, social and governmental factors.

Preliminary Feasibility Study or Pre-Feasibility Study

A Pre-Feasibility Study is a comprehensive study of a range of options for the technical and economic viability of a mineral project that has advanced to a stage where a preferred mining method, in the case of underground mining, or the pit configuration, in the case of an open pit, is established and an effective method of mineral processing is determined. It includes a financial analysis based on reasonable assumptions on the Modifying Factors and the evaluation of any other relevant factors which are sufficient for a Qualified Person, acting reasonably, to determine if all or part of the Mineral Resource may be converted to a Mineral Reserve at the time of reporting. A Pre-Feasibility Study is at a lower confidence level than a Feasibility Study.

Probable Mineral Reserve

A ‘probable mineral reserve’ is the economically mineable part of an indicated, and in some circumstances, a measured mineral resource demonstrated by at least a Preliminary Feasibility Study. This Study must include adequate information on mining, processing, metallurgical, economic, and other relevant factors that demonstrate, at the time of reporting, that economic extraction can be justified.

Proven Mineral Reserve

A ‘proven mineral reserve’ is the economically mineable part of a measured mineral resource demonstrated by at least a Preliminary Feasibility Study. This Study must include adequate information on mining, processing, metallurgical, economic, and other relevant factors that demonstrate, at the time of reporting, that economic extraction is justified.

Qualified Person

A ‘Qualified Person’ means an individual who is an engineer or geoscientist with at least five years of experience in mineral exploration, mine development or operation or mineral project assessment, or any combination of these; has experience relevant to the subject matter of the mineral project and the technical report and is a member or licencee in good standing of a professional association of geoscientists and/or engineers meeting the criteria set out in NI 43-101.

2024 ANNUAL INFORMATION FORM    B-2