MVP Terminal
We have a 50 percent membership interest in MVP Terminalling, LLC (MVP), a Delaware limited liability company formed in September 2017 with a subsidiary of Magellan Midstream Partners LP (Magellan), to construct, own, and operate the Magellan Valero Pasadena marine terminal (MVP Terminal) located adjacent to the Houston Ship Channel in Pasadena, Texas. The MVP Terminal will contain (i) approximately 5 million barrels of storage capacity, (ii) a dock with two ship berths, and (iii) a three-bay truck rack facility. In connection with our terminaling agreement with MVP, described below, we will have dedicated use of (i) approximately 4 million barrels of storage, (ii) one ship berth, and (iii) the three-bay truck rack facility. Construction began in 2017 with a total estimated cost of $840 million for phases one and two of the project, of which we expect to contribute 50 percent (approximately $420 million). The project could expand up to four phases with a total project cost of approximately $1.4 billion if warranted by additional demand and agreed to by Magellan and us. We have contributed $77 million to MVP through September 2017; no further contributions are required to be made during the remainder of 2017.

Concurrent with the formation of MVP, we entered into a terminalling agreement with MVP to utilize the MVP Terminal upon completion of phase two of construction, which is expected to occur in early 2020. The terminalling agreement has an initial term of 12 years with two five-year automatic renewals, and year-to-year renewals thereafter.

Due to our membership interest in MVP and because the terminalling agreement was determined to be a capital lease, we are the accounting owner of the MVP Terminal during the construction period. Accordingly, as of September 30, 2017, we recorded an asset of $110 million in property, plant, and equipment for 100 percent of the construction costs incurred by MVP and a long-term liability of $55 million payable to Magellan. The amounts recorded for the portion of the construction costs associated with the payable to Magellan are noncash investing and financing items, respectively.

Central Texas Pipeline and Terminal Projects
We have a 40 percent undivided interest in a project with a subsidiary of Magellan to jointly build a 135-mile, 16-inch refined petroleum products pipeline with a capacity of up to 150,000 barrels per day from Houston to Hearne, Texas. The pipeline is expected to be completed in mid-2019. Our estimated cost for our 40 percent undivided interest in this pipeline is $170 million.

In addition, we will separately build, own, and operate a terminal in Hearne, a terminal in Williamson County, Texas, and a 70-mile, 12-inch refined petroleum products pipeline connecting the two terminals. The new pipeline and terminals are expected to supply up to 60,000 barrels per day into the central Texas area. Our estimated cost for these projects is $210 million with expected completion in mid-2019.

Environmental Matters
We are involved, together with several other companies, in an environmental cleanup in the Village of Hartford, Illinois (the Village) and during 2015, one of these companies assumed the ongoing remediation in the Village pursuant to a federal court order. We had previously conducted an initial response in the Village, along with other companies, pursuant to an administrative order issued by the EPA. The parties involved in the initial response may have further claims among themselves for costs already incurred. We also continue to be engaged in site assessment and interim measures at the adjacent shutdown refinery site, which we acquired as part of an acquisition in 2005, and we are in litigation with other potentially responsible parties and the Illinois EPA relating to the remediation of the site. In each of these matters, we have various defenses, limitations, and potential rights for contribution from the other responsible parties. We have recorded a liability for our expected contribution obligations. However, because of the unpredictable nature of these cleanups, the methodology for allocation of liabilities, and the State of Illinois’ failure to directly sue third parties responsible for historic contamination at the site, it is reasonably possible that we could incur a loss in a range of $0 to $200 million in excess of the amount of our accrual to ultimately resolve these matters. Factors underlying this estimated range are expected to change from time to time, and actual results may vary significantly from this estimate.

Litigation Matters
We are party to claims and legal proceedings arising in the ordinary course of business. We have not recorded a loss contingency liability with respect to some of these matters because we have determined that it is remote that a loss has been incurred. For other matters, we have recorded a loss contingency liability where we have determined that it is probable that a loss has been incurred and that the loss is reasonably estimable. These loss contingency liabilities are not material to our financial position. We re-evaluate and update our loss contingency liabilities as matters progress over time, and we believe that any changes to the recorded liabilities will not be material to our financial position, results of operations, or liquidity.