OPERATIONAL UPDATE for the nine months ended 31 March 2022 (“Q3 FY22”) | ||
| Unit | Y-on-Y % | Nine months FY22 | Nine months FY21 | Comments | |||||||||||||
| Gold revenue | Rm | 2 | % | 30 669 | 30 166 | Higher gold price received and higher production from South African operations | |||||||||||
| Gold price | R/kg | 1 | % | 877 249 | 868 964 | Higher US$ gold price amidst global geopolitical uncertainty and inflation concerns contributed to a higher Rand gold price received | |||||||||||
| Gold produced total | kg | -2% | 34 357 | 34 969 | Overall production was impacted in the third quarter as a result of the Hidden Valley overland conveyor belt failure, adverse ground conditions at Moab Khotsong, and safety-related stoppages at Mponeng and Bambanani as a result of seismicity. Continuous load-shedding and water outages in the Free State have negatively impacted the square meters mined | ||||||||||||
| oz | -2% | 1 104 598 | 1 124 274 | ||||||||||||||
| Gold production – South Africa | kg | 2 | % | 32 051 | 31 470 | 9-months production from Mponeng and Mine Waste Solutions in this reporting period compared to 6-months in the comparable period | |||||||||||
| Gold production – Hidden Valley | kg | -34% | 2 306 | 3 499 | Lost production as a result of the failure of the overland conveyor belt | ||||||||||||
| Underground total tonnes milled | t’000 | 3 | % | 4 762 | 4 618 | Improvement from Tshepong Operations, Moab Khotsong, Joel and Doornkop alongside a full 9-months production from Mponeng | |||||||||||
| Underground yield | g/t | -3% | 5.39 | 5.54 | Adverse ground conditions at Moab Khotsong alongside the seismicity at Mponeng and Bambanani. We are mining out Bambanani and this mine will be closed at the end of June 2022 | ||||||||||||
| On-going development capital | Rm | 21 | % | 2 074 | 1 717 | Normalisation of capital expenditure post Covid-19. Tshepong Operations, Mponeng and Doornkop primary drivers of the increase | |||||||||||
| Major capital | Rm | 67 | % | 787 | 470 | Planned capital expenditure at Tshepong sub-75 decline, the Zaaiplaats project and Great Noligwa pillar project at Moab Khotsong, Mponeng Carbon Leader project and West complex pump station project | |||||||||||
| All-in sustaining cost (“AISC”) | R/kg | 15 | % | 825 925 | 720 572 | Normalisation of capital expenditure post-Covid-19, lower Q3 FY22 production at Hidden Valley, Bambanani, Tshepong Operations, Target 1, Moab Khotsong and Mponeng | |||||||||||
| US$/oz | 20 | % | 1 703 | 1 416 | |||||||||||||
| Average exchange rate | US$/Rand | -5% | 15.09 | 15.82 | Rand strengthened against the US$ year on year | ||||||||||||
| Adjusted EBITDA** | Rm | -19% | 7 613 | 9 439 | Lower production and higher AISC | ||||||||||||
| Nine months ended | SOUTH AFRICA | ||||||||||||||||||||||||||||||||||||||||
| UNDERGROUND PRODUCTION | |||||||||||||||||||||||||||||||||||||||||
| Tshepong operations | Moab Khotsong | Mponeng | Bambanani | Joel | Doornkop | Target 1 | Kusasalethu | Masimong | Unisel | Total Underground | |||||||||||||||||||||||||||||||
| Ore milled | – t'000 | Mar-22 | 1 167 | 701 | 615 | 139 | 315 | 657 | 345 | 458 | 365 | — | 4 762 | ||||||||||||||||||||||||||||
| Mar-21 | 1 123 | 656 | 442 | 167 | 257 | 624 | 371 | 538 | 383 | 57 | 4 618 | ||||||||||||||||||||||||||||||
| Yield | – g/tonne | Mar-22 | 4.48 | 6.94 | 7.32 | 8.03 | 3.36 | 4.06 | 4.13 | 7.46 | 3.85 | — | 5.39 | ||||||||||||||||||||||||||||
| Mar-21 | 4.77 | 8.36 | 7.83 | 8.84 | 3.98 | 4.27 | 3.38 | 5.75 | 3.97 | 4.33 | 5.54 | ||||||||||||||||||||||||||||||
| Gold produced | – kg | Mar-22 | 5 226 | 4 868 | 4 502 | 1 116 | 1 057 | 2 668 | 1 424 | 3 415 | 1 407 | — | 25 683 | ||||||||||||||||||||||||||||
| Mar-21 | 5 358 | 5 486 | 3 459 | 1 477 | 1 022 | 2 663 | 1 255 | 3 095 | 1 520 | 247 | 25 582 | ||||||||||||||||||||||||||||||
| Gold sold | – kg | Mar-22 | 5 263 | 4 866 | 4 515 | 1 125 | 1 064 | 2 730 | 1 421 | 3 476 | 1 416 | — | 25 876 | ||||||||||||||||||||||||||||
| Mar-21 | 5 262 | 5 461 | 3 250 | 1 453 | 1 005 | 2 630 | 1 274 | 3 069 | 1 494 | 242 | 25 140 | ||||||||||||||||||||||||||||||
| Gold price received | – R/kg | Mar-22 | 885 165 | 885 941 | 917 957 | 877 664 | 884 992 | 879 473 | 890 521 | 885 622 | 889 311 | — | 890 681 | ||||||||||||||||||||||||||||
| Mar-21 | 862 411 | 868 317 | 920 517 | 873 290 | 867 458 | 874 219 | 890 027 | 870 183 | 826 924 | 925 979 | 874 123 | ||||||||||||||||||||||||||||||
Gold revenue1 | (R'000) | Mar-22 | 4 658 626 | 4 310 989 | 4 144 574 | 987 372 | 941 631 | 2 400 962 | 1 265 431 | 3 078 421 | 1 259 265 | — | 23 047 271 | ||||||||||||||||||||||||||||
| Mar-21 | 4 538 005 | 4 741 880 | 2 991 680 | 1 268 890 | 871 795 | 2 299 195 | 1 133 894 | 2 670 593 | 1 235 425 | 224 087 | 21 975 444 | ||||||||||||||||||||||||||||||
| Cash operating cost (net of by-product credits) | (R'000) | Mar-22 | 3 771 500 | 3 098 908 | 3 279 364 | 891 578 | 957 203 | 1 829 006 | 1 336 876 | 2 300 049 | 1 119 348 | — | 18 583 832 | ||||||||||||||||||||||||||||
| Mar-21 | 3 646 124 | 2 864 447 | 1 891 369 | 866 356 | 838 601 | 1 601 328 | 1 234 973 | 2 232 842 | 1 074 876 | 178 154 | 16 429 070 | ||||||||||||||||||||||||||||||
| Inventory movement | (R'000) | Mar-22 | 22 581 | (68 962) | 37 140 | 9 918 | 3 221 | 29 239 | (5 821) | 14 389 | 715 | — | 42 420 | ||||||||||||||||||||||||||||
| Mar-21 | (74 187) | 8 075 | 3 675 | (15 032) | (12 864) | (20 782) | 6 782 | (15 366) | (22 126) | 3 679 | (138 146) | ||||||||||||||||||||||||||||||
| Operating costs | (R'000) | Mar-22 | 3 794 081 | 3 029 946 | 3 316 504 | 901 496 | 960 424 | 1 858 245 | 1 331 055 | 2 314 438 | 1 120 063 | — | 18 626 252 | ||||||||||||||||||||||||||||
| Mar-21 | 3 571 937 | 2 872 522 | 1 895 044 | 851 324 | 825 737 | 1 580 546 | 1 241 755 | 2 217 476 | 1 052 750 | 181 833 | 16 290 924 | ||||||||||||||||||||||||||||||
| Production profit | (R'000) | Mar-22 | 864 545 | 1 281 043 | 828 070 | 85 876 | (18 793) | 542 717 | (65 624) | 763 983 | 139 202 | — | 4 421 019 | ||||||||||||||||||||||||||||
| Mar-21 | 966 068 | 1 869 358 | 1 096 636 | 417 566 | 46 058 | 718 649 | (107 861) | 453 117 | 182 675 | 42 254 | 5 684 520 | ||||||||||||||||||||||||||||||
| Capital expenditure | (R'000) | Mar-22 | 1 090 513 | 592 872 | 428 026 | 25 444 | 145 839 | 328 257 | 275 462 | 148 239 | 36 609 | — | 3 071 261 | ||||||||||||||||||||||||||||
| Mar-21 | 769 822 | 457 707 | 343 844 | 48 812 | 128 354 | 316 598 | 274 479 | 147 212 | 17 005 | — | 2 503 833 | ||||||||||||||||||||||||||||||
| Cash operating costs | – R/kg | Mar-22 | 721 680 | 636 588 | 728 424 | 798 905 | 905 585 | 685 534 | 938 817 | 673 514 | 795 557 | — | 723 585 | ||||||||||||||||||||||||||||
| Mar-21 | 680 501 | 522 138 | 546 796 | 586 565 | 820 549 | 601 325 | 984 042 | 721 435 | 707 155 | 721 271 | 642 212 | ||||||||||||||||||||||||||||||
| Cash operating costs | – R/tonne | Mar-22 | 3 232 | 4 421 | 5 332 | 6 414 | 3 039 | 2 784 | 3 875 | 5 022 | 3 067 | — | 3 903 | ||||||||||||||||||||||||||||
| Mar-21 | 3 247 | 4 367 | 4 279 | 5 188 | 3 263 | 2 566 | 3 329 | 4 150 | 2 806 | 3 126 | 3 558 | ||||||||||||||||||||||||||||||
| Cash operating cost and capital | – R/kg | Mar-22 | 930 351 | 758 377 | 823 498 | 821 704 | 1 043 559 | 808 569 | 1 132 260 | 716 922 | 821 576 | — | 843 168 | ||||||||||||||||||||||||||||
| Mar-21 | 824 178 | 605 569 | 646 202 | 619 613 | 946 140 | 720 213 | 1 202 751 | 769 000 | 718 343 | 721 271 | 740 087 | ||||||||||||||||||||||||||||||
| All-in sustaining cost | – R/kg | Mar-22 | 906 720 | 718 295 | 847 203 | 842 684 | 1 048 263 | 777 090 | 1 124 321 | 726 124 | 850 225 | — | 834 860 | ||||||||||||||||||||||||||||
| Mar-21 | 828 079 | 604 840 | 701 250 | 638 621 | 966 315 | 682 872 | 1 164 805 | 788 756 | 745 626 | 782 126 | 749 497 | ||||||||||||||||||||||||||||||
Operating free cash flow margin2 | % | Mar-22 | (4) | % | 14 | % | 11 | % | 7 | % | (17) | % | 10 | % | (27) | % | 20 | % | 8 | % | — | % | 6 | % | |||||||||||||||||
| Mar-21 | 3 | % | 30 | % | 25 | % | 28 | % | (11) | % | 17 | % | (33) | % | 11 | % | 12 | % | 20 | % | 14 | % | |||||||||||||||||||
| ¹ Includes a non-cash consideration to Franco-Nevada (Mar-22: R370.984m, Mar-21: R231.013m), excluded from the gold price calculation ² Excludes run-of-mine costs for Kalgold (Mar-22: R1.224m, Mar-21:- R2.703m) and Hidden Valley (Mar-22: R293.954m, Mar-21: -R16.974m) | ||
| Nine months ended | SOUTH AFRICA | Hidden Valley | TOTAL HARMONY | ||||||||||||||||||||||||||||||||
| SURFACE PRODUCTION | TOTAL SOUTH AFRICA | ||||||||||||||||||||||||||||||||||
| Mine Waste Solutions | Phoenix | Central plant reclamation | Dumps | Kalgold | Total Surface | ||||||||||||||||||||||||||||||
| Ore milled | – t'000 | Mar-22 | 17 924 | 4 662 | 3 020 | 6 776 | 1 084 | 33 466 | 38 228 | 2 285 | 40 513 | ||||||||||||||||||||||||
| Mar-21 | 11 211 | 4 646 | 3 012 | 7 193 | 1 121 | 27 183 | 31 801 | 2 750 | 34 551 | ||||||||||||||||||||||||||
| Yield | – g/tonne | Mar-22 | 0.128 | 0.122 | 0.141 | 0.326 | 0.80 | 0.19 | 0.84 | 1.01 | 0.85 | ||||||||||||||||||||||||
| Mar-21 | 0.122 | 0.126 | 0.141 | 0.373 | 0.74 | 0.22 | 0.99 | 1.27 | 1.01 | ||||||||||||||||||||||||||
| Gold produced | – kg | Mar-22 | 2 299 | 567 | 427 | 2 209 | 866 | 6 368 | 32 051 | 2 306 | 34 357 | ||||||||||||||||||||||||
| Mar-21 | 1 372 | 587 | 424 | 2 681 | 824 | 5 888 | 31 470 | 3 499 | 34 969 | ||||||||||||||||||||||||||
| Gold sold | – kg | Mar-22 | 2 277 | 561 | 418 | 2 274 | 873 | 6 403 | 32 279 | 2 258 | 34 537 | ||||||||||||||||||||||||
| Mar-21 | 1 340 | 580 | 426 | 2 623 | 827 | 5 796 | 30 936 | 3 513 | 34 449 | ||||||||||||||||||||||||||
| Gold price received | – R/kg | Mar-22 | 748 486 | 883 768 | 890 847 | 895 073 | 882 457 | 839 958 | 880 620 | 829 066 | 877 249 | ||||||||||||||||||||||||
| Mar-21 | 747 663 | 806 409 | 869 277 | 887 894 | 878 695 | 844 639 | 868 599 | 872 186 | 868 964 | ||||||||||||||||||||||||||
Gold revenue1 | (R'000) | Mar-22 | 2 075 286 | 495 794 | 372 374 | 2 035 397 | 770 385 | 5 749 236 | 28 796 507 | 1 872 031 | 30 668 538 | ||||||||||||||||||||||||
| Mar-21 | 1 232 882 | 467 717 | 370 312 | 2 328 947 | 726 681 | 5 126 539 | 27 101 983 | 3 063 988 | 30 165 971 | ||||||||||||||||||||||||||
| Cash operating cost (net of by-product credits) | (R'000) | Mar-22 | 1 193 631 | 328 102 | 215 004 | 1 452 705 | 659 550 | 3 848 992 | 22 432 824 | 1 519 021 | 23 951 845 | ||||||||||||||||||||||||
| Mar-21 | 679 806 | 294 182 | 205 096 | 1 501 537 | 577 660 | 3 258 281 | 19 687 351 | 1 290 907 | 20 978 258 | ||||||||||||||||||||||||||
| Inventory movement | (R'000) | Mar-22 | (18 057) | (4 834) | (3 510) | 29 796 | 265 | 3 660 | 46 080 | (47 997) | (1 917) | ||||||||||||||||||||||||
| Mar-21 | 90 468 | (5 413) | 415 | 15 342 | 865 | 101 677 | (36 469) | (10 398) | (46 867) | ||||||||||||||||||||||||||
| Operating costs | (R'000) | Mar-22 | 1 175 574 | 323 268 | 211 494 | 1 482 501 | 659 815 | 3 852 652 | 22 478 904 | 1 471 024 | 23 949 928 | ||||||||||||||||||||||||
| Mar-21 | 770 274 | 288 769 | 205 511 | 1 516 879 | 578 525 | 3 359 958 | 19 650 882 | 1 280 509 | 20 931 391 | ||||||||||||||||||||||||||
| Production profit | (R'000) | Mar-22 | 899 712 | 172 526 | 160 880 | 552 896 | 110 570 | 1 896 584 | 6 317 603 | 401 007 | 6 718 610 | ||||||||||||||||||||||||
| Mar-21 | 462 608 | 178 948 | 164 801 | 812 068 | 148 156 | 1 766 581 | 7 451 101 | 1 783 479 | 9 234 580 | ||||||||||||||||||||||||||
| Capital expenditure | (R'000) | Mar-22 | 124 165 | 13 140 | 12 519 | 22 872 | 118 960 | 291 656 | 3 362 917 | 1 103 885 | 4 466 802 | ||||||||||||||||||||||||
| Mar-21 | 49 580 | 1 163 | 10 591 | 30 463 | 144 501 | 236 298 | 2 740 131 | 899 463 | 3 639 594 | ||||||||||||||||||||||||||
| Cash operating costs | – R/kg | Mar-22 | 519 196 | 578 663 | 503 522 | 657 630 | 761 605 | 604 427 | 699 910 | 658 725 | 697 146 | ||||||||||||||||||||||||
| Mar-21 | 495 485 | 501 162 | 483 717 | 560 066 | 701 044 | 553 377 | 625 591 | 368 936 | 599 910 | ||||||||||||||||||||||||||
| Cash operating costs | – R/tonne | Mar-22 | 67 | 70 | 71 | 214 | 608 | 115 | 587 | 665 | 591 | ||||||||||||||||||||||||
| Mar-21 | 61 | 63 | 68 | 209 | 515 | 120 | 619 | 469 | 607 | ||||||||||||||||||||||||||
| Cash operating cost and capital | – R/kg | Mar-22 | 573 204 | 601 838 | 532 841 | 667 984 | 898 972 | 650 227 | 804 834 | 1 137 427 | 827 157 | ||||||||||||||||||||||||
| Mar-21 | 531 622 | 503 143 | 508 696 | 571 429 | 876 409 | 593 509 | 712 662 | 625 999 | 703 991 | ||||||||||||||||||||||||||
| All-in sustaining cost | – R/kg | Mar-22 | 557 865 | 600 758 | 540 332 | 661 570 | 910 825 | 645 432 | 797 014 | 1 239 065 | 825 925 | ||||||||||||||||||||||||
| Mar-21 | 622 149 | 500 945 | 507 282 | 589 913 | 894 631 | 625 868 | 726 100 | 671 901 | 720 572 | ||||||||||||||||||||||||||
Operating free cash flow margin2 | % | Mar-22 | 19 | % | 31 | % | 39 | % | 28 | % | (1 | %) | 22 | % | 9 | % | (24 | %) | 7 | % | |||||||||||||||
| Mar-21 | 22 | % | 37 | % | 42 | % | 34 | % | 0 | % | 27 | % | 16 | % | 28 | % | 18 | % | |||||||||||||||||
| ¹ Includes a non-cash consideration to Franco-Nevada (Mar-22: R370.984m, Mar-21: R231.013m), excluded from the gold price calculation ² Excludes run-of-mine costs for Kalgold (Mar-22: R1.224m, Mar-21:- R2.703m) and Hidden Valley (Mar-22: R293.954m, Mar-21: -R16.974m) | ||
| Nine months ended | SOUTH AFRICA | ||||||||||||||||||||||||||||||||||||||||
| UNDERGROUND PRODUCTION | |||||||||||||||||||||||||||||||||||||||||
| Tshepong operations | Moab Khotsong | Mponeng | Bambanani | Joel | Doornkop | Target 1 | Kusasalethu | Masimong | Unisel | Total Underground | |||||||||||||||||||||||||||||||
| Ore milled | - t'000 | Mar-22 | 1 287 | 774 | 678 | 153 | 347 | 724 | 380 | 505 | 403 | — | 5 251 | ||||||||||||||||||||||||||||
| Mar-21 | 1 238 | 723 | 487 | 184 | 284 | 688 | 408 | 593 | 423 | 63 | 5 091 | ||||||||||||||||||||||||||||||
| Yield | - oz/ton | Mar-22 | 0.131 | 0.202 | 0.213 | 0.235 | 0.098 | 0.118 | 0.120 | 0.217 | 0.112 | — | 0.157 | ||||||||||||||||||||||||||||
| Mar-21 | 0.139 | 0.244 | 0.228 | 0.258 | 0.116 | 0.124 | 0.099 | 0.168 | 0.116 | 0.126 | 0.162 | ||||||||||||||||||||||||||||||
| Gold produced | - oz | Mar-22 | 168 020 | 156 510 | 144 742 | 35 880 | 33 983 | 85 777 | 45 783 | 109 795 | 45 235 | — | 825 725 | ||||||||||||||||||||||||||||
| Mar-21 | 172 263 | 176 378 | 111 209 | 47 486 | 32 858 | 85 617 | 40 348 | 99 506 | 48 869 | 7 941 | 822 475 | ||||||||||||||||||||||||||||||
| Gold sold | - oz | Mar-22 | 169 209 | 156 445 | 145 160 | 36 170 | 34 208 | 87 771 | 45 687 | 111 757 | 45 525 | — | 831 932 | ||||||||||||||||||||||||||||
| Mar-21 | 169 177 | 175 575 | 104 490 | 46 715 | 32 311 | 84 556 | 40 960 | 98 670 | 48 033 | 7 780 | 808 267 | ||||||||||||||||||||||||||||||
| Gold price received | - $/oz | Mar-22 | 1 825 | 1 827 | 1 893 | 1 809 | 1 825 | 1 813 | 1 836 | 1 826 | 1 833 | — | 1 836 | ||||||||||||||||||||||||||||
| Mar-21 | 1 695 | 1 707 | 1 809 | 1 717 | 1 705 | 1 718 | 1 749 | 1 710 | 1 625 | 1 820 | 1 718 | ||||||||||||||||||||||||||||||
Gold revenue1 | ($'000) | Mar-22 | 308 792 | 285 750 | 274 719 | 65 447 | 62 415 | 159 145 | 83 878 | 204 050 | 83 469 | — | 1 527 665 | ||||||||||||||||||||||||||||
| Mar-21 | 286 784 | 299 668 | 189 062 | 80 189 | 55 094 | 145 300 | 71 658 | 168 771 | 78 074 | 14 161 | 1 388 761 | ||||||||||||||||||||||||||||||
| Cash operating cost (net of by-product credits) | ($'000) | Mar-22 | 249 990 | 205 408 | 217 369 | 59 097 | 63 447 | 121 234 | 88 613 | 152 456 | 74 195 | — | 1 231 809 | ||||||||||||||||||||||||||||
| Mar-21 | 230 420 | 181 021 | 119 527 | 54 750 | 52 996 | 101 197 | 78 045 | 141 107 | 67 928 | 11 259 | 1 038 250 | ||||||||||||||||||||||||||||||
| Inventory movement | ($'000) | Mar-22 | 1 497 | (4 571) | 2 462 | 657 | 214 | 1 938 | (386) | 954 | 47 | — | 2 812 | ||||||||||||||||||||||||||||
| Mar-21 | (4 688) | 510 | 232 | (950) | (813) | (1 313) | 429 | (971) | (1 398) | 232 | (8 730) | ||||||||||||||||||||||||||||||
| Operating costs | ($'000) | Mar-22 | 251 487 | 200 837 | 219 831 | 59 754 | 63 661 | 123 172 | 88 227 | 153 410 | 74 242 | — | 1 234 621 | ||||||||||||||||||||||||||||
| Mar-21 | 225 732 | 181 531 | 119 759 | 53 800 | 52 183 | 99 884 | 78 474 | 140 136 | 66 530 | 11 491 | 1 029 520 | ||||||||||||||||||||||||||||||
| Production profit | ($'000) | Mar-22 | 57 305 | 84 913 | 54 888 | 5 693 | (1 246) | 35 973 | (4 349) | 50 640 | 9 227 | — | 293 044 | ||||||||||||||||||||||||||||
| Mar-21 | 61 052 | 118 137 | 69 303 | 26 389 | 2 911 | 45 416 | (6 816) | 28 635 | 11 544 | 2 670 | 359 241 | ||||||||||||||||||||||||||||||
| Capital expenditure | ($'000) | Mar-22 | 72 284 | 39 298 | 28 371 | 1 687 | 9 667 | 21 758 | 18 259 | 9 826 | 2 427 | — | 203 577 | ||||||||||||||||||||||||||||
| Mar-21 | 48 650 | 28 925 | 21 730 | 3 085 | 8 111 | 20 008 | 17 346 | 9 303 | 1 075 | — | 158 233 | ||||||||||||||||||||||||||||||
| Cash operating costs | - $/oz | Mar-22 | 1 488 | 1 312 | 1 502 | 1 647 | 1 867 | 1 413 | 1 936 | 1 389 | 1 640 | — | 1 492 | ||||||||||||||||||||||||||||
| Mar-21 | 1 338 | 1 026 | 1 075 | 1 153 | 1 613 | 1 182 | 1 934 | 1 418 | 1 390 | 1 418 | 1 262 | ||||||||||||||||||||||||||||||
| Cash operating costs | - $/t | Mar-22 | 194 | 265 | 321 | 386 | 183 | 167 | 233 | 302 | 184 | — | 235 | ||||||||||||||||||||||||||||
| Mar-21 | 186 | 250 | 245 | 298 | 187 | 147 | 191 | 238 | 161 | 179 | 204 | ||||||||||||||||||||||||||||||
| Cash operating cost and capital | - $/oz | Mar-22 | 1 918 | 1 564 | 1 698 | 1 694 | 2 151 | 1 667 | 2 334 | 1 478 | 1 694 | — | 1 738 | ||||||||||||||||||||||||||||
| Mar-21 | 1 620 | 1 190 | 1 270 | 1 218 | 1 860 | 1 416 | 2 364 | 1 512 | 1 412 | 1 418 | 1 455 | ||||||||||||||||||||||||||||||
| All-in sustaining cost | - $/oz | Mar-22 | 1 869 | 1 481 | 1 747 | 1 737 | 2 161 | 1 602 | 2 318 | 1 497 | 1 753 | — | 1 721 | ||||||||||||||||||||||||||||
| Mar-21 | 1 628 | 1 189 | 1 378 | 1 255 | 1 899 | 1 342 | 2 290 | 1 550 | 1 466 | 1 537 | 1 473 | ||||||||||||||||||||||||||||||
Operating free cash flow margin2 | % | Mar-22 | (4 | %) | 14 | % | 11 | % | 7 | % | (17 | %) | 10 | % | (27 | %) | 20 | % | 8 | % | 0 | % | 6 | % | |||||||||||||||||
| Mar-21 | 3 | % | 30 | % | 25 | % | 28 | % | (11 | %) | 17 | % | (33 | %) | 11 | % | 12 | % | 20 | % | 14 | % | |||||||||||||||||||
| ¹ Includes a non-cash consideration to Franco-Nevada (Mar-22: US$24.590m, Mar-21: US$14.599m), excluded from the gold price calculation ² Excludes run-of-mine costs for Kalgold (Mar-22: US$0.081m, Mar-21:- US$0.168m) and Hidden Valley (Mar-22: US$19.484m, Mar-21: -US$0.574m) | ||
| Nine months ended | SOUTH AFRICA | Hidden Valley | TOTAL HARMONY | ||||||||||||||||||||||||||||||||
| SURFACE PRODUCTION | TOTAL SOUTH AFRICA | ||||||||||||||||||||||||||||||||||
| Mine Waste Solutions | Phoenix | Central plant reclamation | Dumps | Kalgold | Total Surface | ||||||||||||||||||||||||||||||
| Ore milled | - t'000 | Mar-22 | 19 765 | 5 140 | 3 330 | 7 472 | 1 195 | 36 902 | 42 153 | 2 520 | 44 673 | ||||||||||||||||||||||||
| Mar-21 | 12 362 | 5 124 | 3 322 | 7 932 | 1 236 | 29 976 | 35 067 | 3 033 | 38 100 | ||||||||||||||||||||||||||
| Yield | - oz/ton | Mar-22 | 0.004 | 0.004 | 0.004 | 0.010 | 0.023 | 0.006 | 0.024 | 0.029 | 0.025 | ||||||||||||||||||||||||
| Mar-21 | 0.004 | 0.004 | 0.004 | 0.011 | 0.021 | 0.006 | 0.029 | 0.037 | 0.030 | ||||||||||||||||||||||||||
| Gold produced | - oz | Mar-22 | 73 915 | 18 229 | 13 728 | 71 020 | 27 842 | 204 734 | 1 030 459 | 74 139 | 1 104 598 | ||||||||||||||||||||||||
| Mar-21 | 44 110 | 18 873 | 13 632 | 86 196 | 26 492 | 189 303 | 1 011 778 | 112 496 | 1 124 274 | ||||||||||||||||||||||||||
| Gold sold | - oz | Mar-22 | 73 208 | 18 036 | 13 439 | 73 110 | 28 068 | 205 861 | 1 037 793 | 72 596 | 1 110 389 | ||||||||||||||||||||||||
| Mar-21 | 43 082 | 18 648 | 13 696 | 84 331 | 26 589 | 186 346 | 994 613 | 112 945 | 1 107 558 | ||||||||||||||||||||||||||
| Gold price received | - $/oz | Mar-22 | 1 543 | 1 822 | 1 837 | 1 845 | 1 819 | 1 732 | 1 816 | 1 709 | 1 809 | ||||||||||||||||||||||||
| Mar-21 | 1 470 | 1 585 | 1 709 | 1 745 | 1 727 | 1 660 | 1 707 | 1 714 | 1 708 | ||||||||||||||||||||||||||
Gold revenue1 | ($'000) | Mar-22 | 137 558 | 32 863 | 24 682 | 134 914 | 51 064 | 381 081 | 1 908 746 | 124 086 | 2 032 832 | ||||||||||||||||||||||||
| Mar-21 | 77 913 | 29 558 | 23 402 | 147 180 | 45 923 | 323 976 | 1 712 737 | 193 632 | 1 906 369 | ||||||||||||||||||||||||||
| Cash operating cost (net of by-product credits) | ($'000) | Mar-22 | 79 119 | 21 748 | 14 251 | 96 291 | 43 718 | 255 127 | 1 486 936 | 100 687 | 1 587 623 | ||||||||||||||||||||||||
| Mar-21 | 42 961 | 18 591 | 12 961 | 94 891 | 36 506 | 205 910 | 1 244 160 | 81 580 | 1 325 740 | ||||||||||||||||||||||||||
| Inventory movement | ($'000) | Mar-22 | (1 197) | (320) | (233) | 1 975 | 18 | 243 | 3 055 | (3 181) | (126) | ||||||||||||||||||||||||
| Mar-21 | 5 717 | (342) | 26 | 970 | 55 | 6 426 | (2 304) | (657) | (2 961) | ||||||||||||||||||||||||||
| Operating costs | ($'000) | Mar-22 | 77 922 | 21 428 | 14 018 | 98 266 | 43 736 | 255 370 | 1 489 991 | 97 506 | 1 587 497 | ||||||||||||||||||||||||
| Mar-21 | 48 678 | 18 249 | 12 987 | 95 861 | 36 561 | 212 336 | 1 241 856 | 80 923 | 1 322 779 | ||||||||||||||||||||||||||
| Production profit | ($'000) | Mar-22 | 59 636 | 11 435 | 10 664 | 36 648 | 7 328 | 125 711 | 418 755 | 26 580 | 445 335 | ||||||||||||||||||||||||
| Mar-21 | 29 235 | 11 309 | 10 415 | 51 319 | 9 362 | 111 640 | 470 881 | 112 709 | 583 590 | ||||||||||||||||||||||||||
| Capital expenditure | ($'000) | Mar-22 | 8 230 | 871 | 830 | 1 516 | 7 885 | 19 332 | 222 909 | 73 170 | 296 079 | ||||||||||||||||||||||||
| Mar-21 | 3 133 | 73 | 669 | 1 925 | 9 132 | 14 932 | 173 165 | 56 842 | 230 007 | ||||||||||||||||||||||||||
| Cash operating costs | - $/oz | Mar-22 | 1 070 | 1 193 | 1 038 | 1 356 | 1 570 | 1 246 | 1 443 | 1 358 | 1 437 | ||||||||||||||||||||||||
| Mar-21 | 974 | 985 | 951 | 1 101 | 1 378 | 1 088 | 1 230 | 725 | 1 179 | ||||||||||||||||||||||||||
| Cash operating costs | - $/t | Mar-22 | 4 | 4 | 4 | 13 | 37 | 7 | 35 | 40 | 36 | ||||||||||||||||||||||||
| Mar-21 | 3 | 4 | 4 | 12 | 30 | 7 | 35 | 27 | 35 | ||||||||||||||||||||||||||
| Cash operating cost and capital | - $/oz | Mar-22 | 1 182 | 1 241 | 1 099 | 1 377 | 1 853 | 1 341 | 1 659 | 2 345 | 1 705 | ||||||||||||||||||||||||
| Mar-21 | 1 045 | 989 | 1 000 | 1 123 | 1 723 | 1 167 | 1 401 | 1 230 | 1 384 | ||||||||||||||||||||||||||
| All-in sustaining cost | - $/oz | Mar-22 | 1 150 | 1 239 | 1 114 | 1 364 | 1 878 | 1 331 | 1 643 | 2 555 | 1 703 | ||||||||||||||||||||||||
| Mar-21 | 1 223 | 985 | 997 | 1 160 | 1 758 | 1 230 | 1 427 | 1 321 | 1 416 | ||||||||||||||||||||||||||
Operating free cash flow margin2 | % | Mar-22 | 19 | % | 31 | % | 39 | % | 28 | % | (1) | % | 22 | % | 9 | % | (24) | % | 7 | % | |||||||||||||||
| Mar-21 | 22 | % | 37 | % | 42 | % | 34 | % | — | % | 27 | % | 16 | % | 28 | % | 18 | % | |||||||||||||||||
| ¹ Includes a non-cash consideration to Franco-Nevada (Mar-22: US$24.590m, Mar-21: US$14.599m), excluded from the gold price calculation ² Excludes run-of-mine costs for Kalgold (Mar-22: US$0.081m, Mar-21:- US$0.168m) and Hidden Valley (Mar-22: US$19.484m, Mar-21: -US$0.574m) | ||
HARMONY GOLD MINING COMPANY LIMITED | ||
| Harmony Gold Mining Company Limited was incorporated and registered as a public company in South Africa on 25 August 1950 Registration number: 1950/038232/06 | ||
CORPORATE OFFICE | ||
Randfontein Office Park PO Box 2, Randfontein, 1760, South Africa Corner Main Reef Road and Ward Avenue Randfontein, 1759, South Africa Telephone: +27 11 411 2000 Website: www.harmony.co.za | ||
DIRECTORS | ||
Dr PT Motsepe* (chairman), JM Motloba* (deputy chairman), Dr M Msimang*^ (lead independent director), PW Steenkamp (chief executive officer), BP Lekubo (financial director), HE Mashego (executive director) JA Chissano*^#, KT Nondumo*^, VP Pillay*^, GR Sibiya*^, P Turner*^, JL Wetton*^, AJ Wilkens* * Non-executive ^ Independent # Mozambican | ||
INVESTOR RELATIONS | ||
| E-mail: HarmonyIR@harmony.co.za Telephone: +27 11 411 6073 or +27 82 746 4120 | ||
COMPANY SECRETARIAT | ||
E-mail: companysecretariat@harmony.co.za Telephone: +27 11 411 2359 | ||
TRANSFER SECRETARIES | ||
JSE Investor Services (Proprietary) Limited (Registration number 2000/007239/07) 19 Ameshoff Street, 13th Floor, Hollard House, Braamfontein PO Box 4844, Johannesburg, 2000, South Africa Telephone: +27 86 154 6572 E-mail: info@jseinvestorservices.co.za Fax: +27 86 674 4381 | ||
ADR* DEPOSITARY | ||
Deutsche Bank Trust Company Americas c/o American Stock Transfer and Trust Company Operations Centre, 6201 15th Avenue, Brooklyn, NY 11219, United States E-mail queries: db@astfinancial.com Toll free (within the US): +1 886 249 2593 Int: +1 718 921 8137 Fax: +1 718 921 8334 *ADR: American Depositary Receipts | ||
| SPONSOR | ||
JP Morgan Equities South Africa (Proprietary) Limited 1 Fricker Road, corner Hurlingham Road, Illovo, Johannesburg, 2196 Private Bag X9936, Sandton, 2146 Telephone: +27 11 507 0300 Fax: +27 11 507 0503 | ||
| TRADING SYMBOLS | ||
| ISIN: ZAE 000015228 | ||
Harmony Gold Mining Company Limited | |||||||||||||||||
Date: May 12, 2022 | By: /s/ Boipelo Lekubo | ||||||||||||||||
Name: Boipelo Lekubo | |||||||||||||||||
Title: Financial Director | |||||||||||||||||