Rate Matters and Regulation
12 Months Ended
Dec. 31, 2012
Regulated Operations [Abstract]  
Rate Matters and Regulation
Rate Matters and Regulation
 
Regulation and Rates

OG&E's retail electric tariffs are regulated by the OCC in Oklahoma and by the APSC in Arkansas.  The issuance of certain securities by OG&E is also regulated by the OCC and the APSC.  OG&E's wholesale electric tariffs, transmission activities, short-term borrowing authorization and accounting practices are subject to the jurisdiction of the FERC.  The Secretary of the U.S. Department of Energy has jurisdiction over some of OG&E's facilities and operations.  In 2012, 87 percent of OG&E's electric revenue was subject to the jurisdiction of the OCC, eight percent to the APSC and five percent to the FERC.

The OCC issued an order in 1996 authorizing OG&E to reorganize into a subsidiary of OGE Energy.  The order required that, among other things, (i) OGE Energy permit the OCC access to the books and records of OGE Energy and its affiliates relating to transactions with OG&E, (ii) OGE Energy employ accounting and other procedures and controls to protect against subsidization of non-utility activities by OG&E's customers and (iii) OGE Energy refrain from pledging OG&E assets or income for affiliate transactions.  In addition, the Energy Policy Act of 2005 enacted the Public Utility Holding Company Act of 2005, which in turn granted to the FERC access to the books and records of OGE Energy and its affiliates as the FERC deems relevant to costs incurred by OG&E or necessary or appropriate for the protection of utility customers with respect to the FERC jurisdictional rates.

Completed Regulatory Matters

OG&E Contract and Wind Energy Purchase Agreement Filing

On December 1, 2011, OG&E filed an application with the OCC requesting approval of a 20-year agreement that is intended to provide wind power to help meet the current and future power generation needs of Oklahoma State University. The project called for OG&E to contract with NextEra Energy to build a 60 MW wind farm near Blackwell, Oklahoma, to support the Oklahoma State University project in which NextEra Energy built, owns and operates the wind farm and OG&E purchases the electric output. On February 22, 2012, OG&E, the Attorney General and the Public Utility Division of the OCC signed a settlement agreement whereby the stipulating parties requested that the OCC issue an order approving the agreement for electric service with Oklahoma State University. On March 12, 2012, OG&E received an order from the OCC approving the settlement agreement. Pursuant to the terms of the power purchase agreement between OG&E and NextEra Energy, OG&E has been purchasing the electric output of the wind farm since November 2012 and uses that power to provide service to Oklahoma State University and its other retail customers. The wind farm was fully in service in December 2012.

OG&E SPP Transmission Projects

The SPP is a regional transmission organization under the jurisdiction of the FERC that was created to ensure reliable supplies of power, adequate transmission infrastructure and competitive wholesale prices of electricity. The SPP does not build transmission though the SPP's tariff contains rules that govern the transmission construction process. Transmission owners complete the construction and then own, operate and maintain transmission assets within the SPP region. When the SPP Board of Directors approves a project, the transmission provider in the area where the project is needed currently has the first obligation to build; however, the process for deciding which entity constructs and owns a project may change as a result of FERC Order. No. 1000 discussed below.
There are several studies currently under review at the SPP including a 20-year plan to address issues of regional and interregional importance. The 20-year plan suggests overlaying the SPP footprint with a 345 kilovolt transmission system and integrating it with neighboring regional entities. In 2009, the SPP Board of Directors approved a new report that recommended restructuring the SPP's regional planning processes to focus on the construction of a robust transmission system, large enough in both scale and geography, to provide flexibility to meet the SPP's future needs. OG&E expects to actively participate in the ongoing study, development and transmission growth that may result from the SPP's plans.
In 2007, the SPP notified OG&E to construct 44 miles of a new 345 kilovolt transmission line originating at OG&E's existing Sooner 345 kilovolt substation and proceeding generally in a northerly direction to the Oklahoma/Kansas Stateline (referred to as the Sooner-Rose Hill project). At the Oklahoma/Kansas Stateline, the line connects to the companion line constructed in Kansas by Westar Energy. The transmission line was placed in service in April 2012. The total capital expenditures associated with this project were $45 million.

In January 2009, OG&E received notification from the SPP to begin construction on 50 miles of a new 345 kilovolt transmission line and substation upgrades at OG&E's Sunnyside substation, among other projects. In April 2009, Western Farmers Electric Cooperative assigned to OG&E the construction of 50 miles of line designated by the SPP to be built by Western Farmers Electric Cooperative.  The new line extends from OG&E's Sunnyside substation near Ardmore, Oklahoma, 123.5 miles to the Hugo substation owned by Western Farmers Electric Cooperative near Hugo, Oklahoma.  The transmission line was completed in April 2012. The total capital expenditures associated with this project were $157 million.

As discussed below, the OCC approved a settlement agreement in OG&E's 2011 Oklahoma rate case filing that included an expedited procedure for recovering the costs of the two projects.  On July 31, 2012, OG&E filed an application with the OCC requesting an order authorizing recovery for the two projects through the SPP transmission systems additions rider. On October 2, 2012, all parties signed a settlement agreement in this matter which stated: (i) the parties agree not to oppose requested relief sought by OG&E, (ii) OG&E will host meetings to discuss the SPP’s transmission planning process, including any future transmission projects for which OG&E has received a notice to construct from the SPP, and (iii) there will be opportunities for parties to provide input related to transmission planning studies that the SPP performs to identify future transmission projects. On October 25, 2012, the OCC issued an order approving the settlement agreement and granting OG&E cost recovery for the two projects. OG&E initiated cost recovery beginning with the first billing cycle in November 2012.
OG&E 2011 Oklahoma Rate Case Filing

On July 28, 2011, OG&E filed its application with the OCC requesting an annual rate increase of $73.3 million, or a 4.3 percent increase in its rates. OG&E requested a return on equity of 11.0 percent based on a common equity percentage of 53.0 percent. In its application, OG&E requested recovery of increases in its operating costs and to begin earning on approximately $500 million of new capital investments made on behalf of its Oklahoma customers during the previous two and one-half years. On July 2, 2012, OG&E and other parties associated with its rate increase reached a settlement agreement in this matter. On July 9, 2012, the OCC issued an order approving the settlement agreement in this matter. Key terms of the settlement agreement included: (i) an annual net increase of approximately $4.3 million in OG&E's rates to its Oklahoma retail customers, (ii) OG&E's Oklahoma retail authorized return on equity of 10.2 percent, (iii) the rate of return under various recovery riders previously approved by the OCC, including riders for OG&E's smart grid implementation and Crossroads wind farm, is based on OG&E's actual debt and equity ratios as reflected in OG&E's application and a 10.2 percent return on equity, (iv) depreciation rates were implemented in the same month new customer rates went into effect, (v) the pension and postretirement medical cost tracker remains in effect, (vi) a procedure was established to expedite the recovery of the cost of specified high-voltage transmission projects and (vii) extension of funding for OG&E's system hardening program. OG&E expects the impact of the rate increase on its customers and service territory to be minimal as the rate increase will be more than offset by lower fuel costs attributable to prior fuel over recoveries from lower than forecasted fuel costs. OG&E implemented the new rates effective in early August.

OG&E Smart Grid Project

On December 17, 2010, OG&E filed an application with the APSC requesting pre-approval for system-wide deployment of smart grid technology and a recovery rider, including a credit for the Smart Grid grant awarded by the U.S. Department of Energy under the American Recovery and Reinvestment Act of 2009. On June 22, 2011, OG&E reached a settlement agreement with all the parties in this matter. OG&E and the other parties in this matter agreed to ask the APSC to approve the settlement agreement including the following: (i) pre-approval of system-wide deployment of smart grid technology in Arkansas and authorization for OG&E to begin recovering the prudently incurred costs of the Arkansas system-wide deployment of smart grid technology through a rider mechanism that will become effective in accordance with the order approving the settlement agreement; (ii) cost recovery through the rider would commence when all of the smart meters to be deployed in Arkansas are in service; (iii) OG&E guarantees that customers will receive certain operations and maintenance cost reductions resulting from the smart grid deployment as a credit to the recovery rider; and (iv) the stranded costs associated with OG&E's existing meters which are being replaced by smart meters will be accumulated in a regulatory asset and recovered in base rates beginning after an order is issued in OG&E's next general rate case. On August 3, 2011, the APSC issued an order in this matter approving the settlement agreement. On November 5, 2012, OG&E filed a revised smart grid recovery rider rate schedule. On December 13, 2012, the APSC issued an order in this matter approving the revised smart grid recovery rider to be effective beginning with the first billing cycle in January 2013 through December 2013. OG&E began recovering the estimated capital costs of $14 million and associated operation and maintenance costs for deployment of smart grid technology, along with incremental costs for web portal access and education of $0.8 million. The APSC also found that the prudence of OG&E’s smart grid expenditures will be determined in OG&E's next Arkansas rate case and that revenues collected under the rider are subject to refund, with interest, only in the event that the APSC determines that OG&E's smart grid expenditures were not prudent. The costs recoverable from Oklahoma customers for system-wide deployment of smart grid technology and implementing the smart grid pilot program were capped at $366.4 million (inclusive of the U.S. Department of Energy grant award amount) subject to an offset for any recovery of those costs from Arkansas customers and are currently being recovered through a rider which will remain in effect until the smart grid project costs are included in base rates in OG&E's next general rate case. This project was completed in late 2012 and the smart grid project costs did not exceed $366.4 million.

OG&E Demand and Energy Efficiency Program Filing
On July 2, 2012, OG&E filed an application with the OCC requesting approval of OG&E's 2013 demand portfolio, the authorization to recover the program costs, lost revenues associated with any achieved energy, demand savings and performance based incentives through the demand program rider and the recovery of costs associated with research and development investments. On July 16, 2012, OG&E filed an amended application which modified various calculations to reflect the rate of return authorized by the OCC in OG&E's 2011 rate case order and provided for consideration of a peak time rebate program. On December 20, 2012, the OCC approved a settlement with all parties in this matter. Key terms of the settlement included (i) approval of the program budgets proposed by OG&E and an additional amount of approximately $7 million over the three-year period for the energy efficiency programs, (ii) approval of OG&E’s proposed Demand Program Rider tariff, (iii) the recovery through the Demand Program Rider of the increased program costs and the net lost revenues, incentives and research and development investments requested by OG&E, with the exception of lost revenues resulting from the Integrated Volt Var Control program (automated intelligence to control voltage and power on the distribution lines) and incentives for the SmartHours® and Integrated Volt Var Control demand response programs, (iv) recovery of the program costs on a levelized basis over the three-year period, (v) consideration of implementing a peak time rebate program in 2015 and (vi) the periodic filing of additional reports. The Demand Program Rider became effective on January 1, 2013.
OG&E Fuel Adjustment Clause Review for Calendar Year 2010
The OCC routinely reviews the costs recovered from customers through OG&E’s fuel adjustment clause. On August 19, 2011, the OCC Staff filed an application to review OG&E’s fuel adjustment clause for calendar year 2010, including the prudence of OG&E’s electric generation, purchased power and fuel procurement costs. OG&E responded by filing direct testimony and the minimum filing review package on October 18, 2011. On September 26, 2012, the administrative law judge recommended that the OCC find that for the calendar year 2010 OG&E's generation, purchase power and fuel procurement processes and costs, including the cost of replacement power for the Sooner 2 outage, were prudent and no disallowance (as discussed below) for any of these expenses is warranted. On January 31, 2013, the OCC issued an order approving the administrative law judge's recommendation. Previously, the Oklahoma Industrial Energy Consumers recommended that the OCC disallow recovery of approximately $44 million of costs previously recovered through OG&E's fuel adjustment clause. These recommendations were based on allegations that OG&E's lower cost coal-fired generation was underutilized, that OG&E failed to aggressively pursue purchasing power at a cost lower than its marginal cost of generation and that OG&E should be found imprudent related to an unplanned outage at OG&E's Sooner 2 coal unit in November and December 2010. Previously, the OCC Staff recommended approval of OG&E's actions related to utilization of coal plants and practices related to purchasing power but recommended that OG&E refund $3 million to customers because of the Sooner 2 outage.
Enogex 2011 Fuel Filing
 
On February 28, 2011, Enogex submitted its annual fuel filing to establish the fixed fuel percentages for its East Zone and West Zone for the upcoming fuel year (April 1, 2011 through March 31, 2012).  Along with the revised fuel percentages, Enogex also requested authority to revise its statement of operating conditions to permanently change the annual filing date to February 28.  On July 6, 2012, Enogex submitted a compliance filing to synchronize the 2011 fuel filing with the revised statement of operating conditions filed on May 31, 2012 in compliance with the FERC's order approving Enogex's 2011 Section 311 rate case settlement.  In October 2012, the FERC accepted Enogex's proposed zonal fuel percentages.

Enogex 2012 Fuel Filing

On February 24, 2012, Enogex submitted its annual fuel filing to establish the fixed fuel percentages for its East Zone and West Zone for the 2012 fuel year (April 1, 2012 through March 31, 2013). On July 6, 2012, Enogex submitted a compliance filing to synchronize the 2012 fuel filing with the revised statement of operating conditions filed on May 31, 2012 in compliance with the FERC's order approving Enogex's 2011 Section 311 rate case settlement. In October 2012, the FERC accepted Enogex's proposed zonal fuel percentages.

Enogex Storage Statement of Operating Conditions Filing

On August 31, 2010, Enogex filed a new statement of operating conditions applicable to storage services with the FERC that replaced Enogex's existing storage statement of operating conditions effective July 30, 2010.  Among other things, the new storage statement of operating conditions updates the general terms and conditions for providing storage services. On December 7, 2012, the FERC issued an order approving Enogex's revised storage statement of operating conditions, effective August 31, 2010.

Enogex FERC Section 311 2011 Rate Case
 
On January 28, 2011, Enogex submitted a new rate filing to the FERC to set the maximum rate for a new firm Section 311 transportation service in the West Zone of its system and to revise the currently effective maximum rates for Section 311 interruptible transportation service in the East Zone and West Zone.  Along with establishing the rate for a new firm service in the West Zone, Enogex's filing requested a decrease in the maximum interruptible zonal rates in the West Zone and to retain the currently effective rates for firm and interruptible services in the East Zone.  Enogex reserved the right to implement the higher rates for firm and interruptible services in the East Zone supported by the cost of service to the extent an expeditious settlement agreement cannot be reached in the proceeding.  Enogex proposed that the rates be placed into effect on March 1, 2011.  On January 10, 2012, Enogex filed a settlement agreement with the FERC. On May 4, 2012, the FERC issued an order approving the settlement agreement in this matter, subject to the submission of a compliance filing to place the settlement rates into effect as of March 1, 2011, which compliance filing was subsequently filed on May 31, 2012. The FERC also requested that Enogex file a revised statement of operating conditions, which was subsequently filed on May 31, 2012. As part of the settlement agreement in this matter, Enogex made refunds of $0.2 million to affected customers on June 15, 2012 and submitted a report to the FERC on July 6, 2012 showing the refund payment calculation. On February 21, 2013, the FERC issued an order approving the refund report.

Pending Regulatory Matters

FERC Order No. 1000, Final Rule on Transmission Planning and Cost Allocation

On July 21, 2011, the FERC issued Order No. 1000, which revised the FERC's existing regulations governing the process for planning enhancements and expansions of the electric transmission grid in a particular region, along with the corresponding process for allocating the costs of such expansions. Order No. 1000 leaves to individual regions to determine whether a previously-approved project is subject to reevaluation and is therefore governed by the new rule.

Order No. 1000 requires, among other things, public utility transmission providers, such as the SPP, to participate in a process that produces a regional transmission plan satisfying certain standards, and requires that each such regional process consider transmission needs driven by public policy requirements (such as state or Federal policies favoring increased use of renewable energy resources). Order No. 1000 also directs public utility transmission providers to coordinate with neighboring transmission planning regions. In addition, Order No. 1000 establishes specific regional cost allocation principles and directs public utility transmission providers to participate in regional and interregional transmission planning processes that satisfy these principles.

On the issue of determining how entities are to be selected to develop and construct the specific transmission projects, Order No. 1000 directs public utility transmission providers to remove from the FERC-jurisdictional tariffs and agreements provisions that establish any Federal "right of first refusal" for the incumbent transmission owner (such as OG&E) regarding transmission facilities selected in a regional transmission planning process, subject to certain limitations. However, Order No. 1000 is not intended to affect the right of an incumbent transmission owner (such as OG&E) to build, own and recover costs for upgrades to its own transmission facilities, and Order No. 1000 does not alter an incumbent transmission owner's use and control of existing rights of way. Order No. 1000 also clarifies that incumbent transmission owners may rely on regional transmission facilities to meet their reliability needs or service obligations. The SPP currently has a "right of first refusal" for incumbent transmission owners and this provision has played a role in OG&E being selected by the SPP to build various transmission projects in Oklahoma. These changes to the "right of first refusal" apply only to "new transmission facilities," which are described as those subject to evaluation or reevaluation (under the applicable local or regional transmission planning process) subsequent to the effective date of the regulatory compliance filings required by the rule, which were filed on November 13, 2012.

OGE Energy cannot, at this time, determine the precise impact of Order No. 1000 on OG&E. OG&E has filed a petition for review in the D.C. Circuit relating to the same matter. Nevertheless, at the present time, OGE Energy has no reason to believe that the implementation of Order No. 1000 will impact OG&E's transmission projects currently under development and construction for which OG&E has received a notice to proceed from the SPP.

OG&E Market-Based Rate Authority
On June 29, 2012, OG&E filed its triennial market power update with the FERC to retain its market-based rate authorization in the SPP's energy imbalance service market but to surrender its market-based rate authorization for any market-based rate sales outside the SPP's energy imbalance service market. A FERC order is pending.

OG&E Fuel Adjustment Clause Review for Calendar Year 2011

On July 31, 2012, the OCC Staff filed an application for a public hearing to review and monitor OG&E's application of the 2011 fuel adjustment clause and for a prudence review of OG&E's electric generation, purchased power and fuel procurement processes and costs in calendar year 2011.  OG&E filed the necessary information and documents needed to satisfy the OCC's minimum filing requirement rules on October 1, 2012.  On December 19, 2012, witnesses for the OCC Staff filed responsive testimony recommending that the OCC approve OG&E's fuel adjustment clause costs and recoveries for the calendar year 2011 and recommending that the OCC find that OG&E's electric generation, purchased power, fuel procurement and other fuel related practices, policies and decisions during calendar year 2011 were fair, just and reasonable and prudent.  The Oklahoma Industrial Energy Consumers filed a statement of position on December 19, 2012 and did not challenge OG&E's application of its fuel adjustment clause or prudency.  The Oklahoma Industrial Energy Consumers reserved its right to file rebuttal testimony, cross examine witnesses and amend its statement of position should circumstances change or additional information becomes available in the course of this proceeding. On January 7, 2013, the Oklahoma Attorney General filed a statement of position stating that after reviewing the case information the Attorney General has no reason at this time to dispute the findings of the OCC Staff.  A hearing in this matter is scheduled for April 4, 2013.

OG&E Crossroads Wind Farm

As previously reported, OG&E signed memoranda of understanding in February 2010 for approximately 197.8 MWs of wind turbine generators and certain related balance of plant engineering, procurement and construction services associated with the Crossroads wind farm. Also as part of this project, on June 16, 2011, OG&E entered into an interconnection agreement with the SPP for the Crossroads wind farm which allowed the Crossroads wind farm to interconnect at 227.5 MWs. On August 31, 2012, OG&E filed an application with the APSC requesting approval to recover the Arkansas portion of the costs of the Crossroads wind farm through a rider until such costs are included in OG&E's base rates as part of its next general rate proceeding. On December 14, 2012, the APSC Staff filed testimony recommending that the APSC find that the Crossroads wind farm is in the public interest and that it approve interim recovery through the Energy Cost Recovery Rider effective August 31, 2012. OG&E concurred with the APSC Staff’s recommendations. On January 16, 2013, the APSC granted a motion made by OG&E and the APSC Staff to cancel the hearing previously scheduled and issue an order based on the filed record. On February 22, 2013, the APSC directed OG&E to respond to two questions in order to complete the record upon which they may rule. OG&E believes it is reasonable to expect a final order from the APSC by the end of the first quarter.
OG&E Fuel Adjustment Clause Review for Calendar Year 2009 Related to Enogex Gas Transportation and Storage Agreement

As previously reported, under the terms of a settlement agreement reached in 2011 regarding the prudency of OG&E's fuel adjustment clause for 2009, OG&E agreed to hire a third party expert to evaluate its prospective gas transportation and storage needs and to identify options for meeting those needs. Upon completion of the third party evaluation, OG&E agreed to file a cause to address the third party's evaluation, recommendations and conclusions. On January 31, 2013, OG&E filed a cause that included OG&E's response to the final evaluations and conclusions of the third party consultant, Black & Veatch, and OG&E's assessment of transportation and storage needs for the next three to five years.

Also, as part of this matter, on August 9, 2012, OG&E filed an application with the OCC requesting: (i) an order finding that a one-year extension to April 30, 2014 of OG&E's gas transportation and storage agreement with Enogex is prudent, (ii) a waiver of the OCC's competitive procurement rules and (iii) finding that the one-year extension of the gas transportation and storage agreement complies with the OCC's affiliate transaction rules. On September 14, 2012, OG&E filed a settlement agreement in which all parties to this matter agreed to the one-year extension of the Enogex contract and cost recovery from ratepayers at the rates currently in effect. On October 25, 2012, the OCC issued an order approving the settlement agreement.