Management’s discussion and analysis

for the quarter ended September 30, 2023

 

5    THIRD QUARTER MARKET UPDATE
9    OUR STRATEGY
12    CONSOLIDATED FINANCIAL RESULTS
18    OUTLOOK FOR 2023
20    LIQUIDITY AND CAPITAL RESOURCES
23    FINANCIAL RESULTS BY SEGMENT
27    OUR OPERATIONS - THIRD QUARTER UPDATES
30    QUALIFIED PERSONS
31    ADDITIONAL INFORMATION

This management’s discussion and analysis (MD&A) includes information that will help you understand management’s perspective of our unaudited condensed consolidated interim financial statements and notes for the quarter ended September 30, 2023 (interim financial statements). The information is based on what we knew as of October 30, 2023, and updates our first quarter, second quarter and annual MD&A included in our 2022 annual report.

As you review this MD&A, we encourage you to read our interim financial statements as well as our audited consolidated financial statements and notes for the year ended December 31, 2022, and annual MD&A. You can find more information about Cameco, including our audited consolidated financial statements and our most recent annual information form, on our website at cameco.com, on SEDAR+ at sedarplus.ca or on EDGAR at sec.gov. You should also read our annual information form before making an investment decision about our securities.

The financial information in this MD&A and in our financial statements and notes are prepared according to International Financial Reporting Standards (IFRS), unless otherwise indicated.

Unless we have specified otherwise, all dollar amounts are in Canadian dollars.

Throughout this document, the terms we, us, our and Cameco mean Cameco Corporation and its subsidiaries unless otherwise indicated.


Caution about forward-looking information

Our MD&A includes statements and information about our expectations for the future. When we discuss our strategy, plans, future financial and operating performance, or other things that have not yet taken place, we are making statements considered to be forward-looking information or forward-looking statements under Canadian and United States (US) securities laws. We refer to them in this MD&A as forward-looking information.

Key things to understand about the forward-looking information in this MD&A:

 

   

It typically includes words and phrases about the future, such as: anticipate, believe, estimate, expect, plan, will, intend, goal, target, forecast, project, strategy and outlook (see examples below).

 

   

It represents our current views and can change significantly.

 

   

It is based on a number of material assumptions, including those we have listed starting on page 4, which may prove to be incorrect.

 

   

Actual results and events may be significantly different from what we currently expect, due to the risks associated with our business. We list a number of these material risks below. We recommend you also review our most recent annual information form and annual MD&A, which includes a discussion of other material risks that could cause actual results to differ significantly from our current expectations.

 

   

Forward-looking information is designed to help you understand management’s current views of our near-term and longer-term prospects, and it may not be appropriate for other purposes. We will not necessarily update this information unless we are required to by securities laws.

 

Examples of forward-looking information in this MD&A

 

    our expectations regarding 2023 and future uranium supply, demand, contracting, geopolitical issues, and the market including the discussion under the heading Third quarter market update

 

    the discussion under the heading Our strategy, including the role of nuclear energy in the world’s shift to a low-carbon, climate-resilient economy, our expectation that our strategy will allow us to increase long-term value, our intention to execute our strategy with an emphasis on safety, people and the environment, our belief that we have the right strategy to achieve our vision and will do so in a manner that reflects our values, our ability to address environmental, social and governance risks and opportunities, and our ambition to reach net-zero greenhouse gas emissions

 

    the discussion under the heading Strategy in action including, the demand for nuclear fuel supplies, our expectations regarding uranium contracting and our contract portfolio, our plans for production at McArthur River/Key Lake, Cigar Lake, and the Port Hope UF6 conversion facility, our expectations regarding production levels at JV Inkai, and our expected financial capacity to execute our strategy and self-manage risk

 

    the discussion of our expectations relating to our acquisition of a 49% interest in Westinghouse Electric Company (Westinghouse), including the sources and uses of financing for the acquisition, the timeline of the acquisition, including the anticipated closing thereof, and creating a powerful platform for strategic growth

 

    the discussion of our expectations relating to our Canada Revenue Agency (CRA) transfer pricing dispute, our confidence that the courts would reject any attempt by CRA to utilize the same position and arguments for tax years 2007 through 2014 or the alternate position advanced for tax years 2014 through 2016, and our belief that CRA should return the full amount of cash and security that has been paid or otherwise secured by us
    the discussion under the heading Outlook for 2023, including our production plan, expected improvement in financial performance, expected care and maintenance costs for our tier-two assets, our cash balances and the generation of cash flow, our outlook for our uranium average realized price, and other information in the table under the heading 2023 Financial Outlook, our revenue, adjusted net earnings, and cash flow sensitivity analysis, and our price sensitivity analysis for our uranium segment

 

    the discussion under the heading Liquidity and capital resources, including expected liquidity to meet 2023 obligations and our expectations for our uranium contract portfolio to provide a solid revenue stream

 

    our expectation that our operating and investment activities for the remainder of 2023 will not be constrained by the financial-related covenants in our unsecured revolving credit facility

 

    our intention to update the table under the heading Purchase commitments to reflect material changes to purchase commitments and prices

 

    our future plans and expectations for each of our uranium operating properties and fuel services operating sites, including production levels and our expected cash cost of production at McArthur River/Key Lake and Cigar Lake, and our expectation that the renewed licences will allow McArthur River/Key Lake to operate until October 2043

 

    expected timing for the transit of the first and second shipments of our 2023 share of Inkai’s production and the possibility of further delays in expected Inkai deliveries this year

 

    we have inventory, long-term purchase agreements and loan arrangements in place that we can draw upon to mitigate the risk of delay in Inkai deliveries

 

    the expected care and maintenance costs for our US ISR Operations and Rabbit Lake for 2023, and our expectation that the renewed licence will allow Rabbit Lake to operate until October 2038, once it has resumed operations

 

    our 2023 annual dividend payment date and the considerations relevant to future dividends
 

 

2    CAMECO CORPORATION


Material Risks

 

    actual sales volumes or market prices for any of our products or services are lower than we expect, or cost of sales is higher than we expect, for any reason, including changes in market prices, loss of market share to a competitor, trade restrictions, or geopolitical issues

 

    we are adversely affected by changes in currency exchange rates, interest rates, royalty rates, tax rates or inflation

 

    our production costs are higher than planned, or necessary supplies are not available, or not available on commercially reasonable terms

 

    our strategies may change, be unsuccessful or have unanticipated consequences, or we may not be able to achieve anticipated operational flexibility and efficiency

 

    changing views of governments regarding the pursuit of carbon reduction strategies or that our view on the role of nuclear power in pursuit of those strategies may prove to be inaccurate

 

    risks relating to the development and use of new technology or lack of appropriate technology needed to achieve our 30% greenhouse gas (GHG) emissions reduction target or advance our ambition to reach net-zero GHG emissions

 

    our estimates and forecasts prove to be inaccurate, including production, purchases, deliveries, cash flow, revenue, costs, decommissioning, reclamation expenses, or the receipt of future dividends from JV Inkai

 

    the Westinghouse acquisition may be delayed or may not be completed on the terms in the acquisition agreement or at all

 

    consummation of the Westinghouse acquisition is subject to the satisfaction of closing conditions and receipt of required approvals that may not be satisfied on a timely basis or at all

 

    that we may not realize expected benefits from the Westinghouse acquisition

 

    we are unable to enforce our legal rights under our agreements, permits or licences

 

    disruption or delay in the transportation of our products

 

    we are subject to litigation or arbitration that has an adverse outcome

 

    that the courts may accept the same, similar or different positions and arguments advanced by CRA to reach decisions that are adverse to us for other tax years

 

    the possibility of a materially different outcome in disputes with CRA for other tax years

 

    that CRA does not agree that the court rulings for the years that have been resolved in Cameco’s favour should apply to subsequent tax years

 

    that CRA will not return all or substantially all of the cash and security that has been paid or otherwise secured in a timely manner, or at all

 

    there are defects in, or challenges to title, to our properties

 

    our mineral reserve and resource estimates are not reliable, or there are unexpected or challenging geological, hydrological or mining conditions

 

    we are affected by environmental, safety and regulatory risks, including workforce health and safety or increased regulatory burdens or delays
    necessary permits or approvals from government authorities cannot be obtained or maintained

 

    we are affected by political risks, including unrest in Kazakhstan, and geopolitical events, including the Russian invasion of Ukraine

 

    operations are disrupted due to problems with our own or our joint venture partners’, suppliers’ or customers’ facilities, the unavailability of reagents, equipment, operating parts and supplies critical to production, equipment failure, lack of tailings capacity, labour shortages, labour relations issues, strikes or lockouts, fires, underground floods, cave-ins, ground movements, tailings dam failures, transportation disruptions or accidents, aging infrastructure, or other development and operating risks

 

    we are affected by war, terrorism, cyber-attacks, sabotage, blockades, civil unrest, social or political activism, outbreak of illness (such as a pandemic like COVID-19), accident or a deterioration in political support for, or demand for, nuclear energy

 

    a major accident at a nuclear power plant

 

    we are impacted by changes in the regulation or public perception of the safety of nuclear power plants, which adversely affect the construction of new plants, the relicensing of existing plants and the demand for uranium

 

    government laws, regulations, policies or decisions that adversely affect us, including tax and trade laws and sanctions on nuclear fuel exports and imports

 

    our uranium suppliers or purchasers fail to fulfil their commitments

 

    our McArthur River development, mining or production plans are delayed or do not succeed for any reason, including due to labour disruption

 

    our Key Lake mill production plan is delayed or does not succeed for any reason, including due to labour disruption

 

    our Cigar Lake development, mining or production plans are delayed or do not succeed for any reason

 

    we may be unable to operate McArthur River/Key Lake, or Rabbit Lake once it has resumed operations, for the full period of our current licences

 

    JV Inkai’s development, mining or production plans are delayed or do not succeed for any reason or JV Inkai is unable to transport and deliver its production

 

    our production plan for our Port Hope UF6 conversion facility is delayed or does not succeed for any reason, including due to the availability of production supplies

 

    our expectations relating to care and maintenance costs prove to be inaccurate

 

    we are affected by natural phenomena, such as forest fires, floods and earthquakes as well as shifts in temperature, precipitation, and the impact of more frequent severe weather conditions on our operations as a result of climate change
 

 

2023 THIRD QUARTER REPORT    3


Material Assumptions

 

    our expectations regarding sales and purchase volumes and prices for uranium and fuel services, cost of sales, trade restrictions, inflation, and that counterparties to our sales and purchase agreements will honour their commitments

 

    our expectations for the nuclear industry, including its growth profile, market conditions, geopolitical issues, and the demand for and supply of uranium

 

    the continuing pursuit of carbon reduction strategies by governments and the role of nuclear in the pursuit of those strategies

 

    the availability or development of technologies needed to achieve our 30% GHG emissions reduction target or advance our net-zero GHG emission ambition

 

    the assumptions discussed under the heading 2023 Financial Outlook

 

    our expectations regarding spot prices and realized prices for uranium, and other factors discussed under the heading Price sensitivity analysis: uranium segment

 

    the Westinghouse acquisition is closed on the anticipated timeline and on the terms in the acquisition agreement

 

    market conditions and other factors upon which we based the Westinghouse acquisition and our related forecasts will be as expected

 

    the success of our plans and strategies relating to the Westinghouse acquisition

 

    that the construction of new nuclear power plants and the relicensing of existing nuclear power plants will not be adversely affected by changes in regulation or in the public perception of the safety of nuclear power plants

 

    our ability to continue to supply our products and services in the expected quantities and at the expected times

 

    our expected production levels for Cigar Lake, McArthur River/Key Lake, JV Inkai and our fuel services operating sites

 

    plans to transport our products succeed, including the shipment of our share of JV Inkai production to our Blind River refinery

 

    our ability to mitigate adverse consequences of delays in the shipment of our share of JV Inkai production to our Blind River refinery

 

    our cost expectations, including production costs, operating costs, and capital costs

 

    our expectations regarding tax payments, tax rates, royalty rates, currency exchange rates, interest rates and inflation

 

    in our dispute with CRA that courts will reach consistent decisions for other tax years that are based upon similar positions and arguments
    that CRA will not successfully advance different positions and arguments that may lead to different outcomes for other tax years

 

    our expectation that we will recover all or substantially all of the amounts paid or secured in respect of the CRA dispute to date

 

    our decommissioning and reclamation estimates, including the assumptions upon which they are based, are reliable

 

    our mineral reserve and resource estimates, and the assumptions upon which they are based, are reliable

 

    our understanding of the geological, hydrological and other conditions at our uranium properties

 

    our McArthur River and Cigar Lake development, mining and production plans succeed

 

    our Key Lake mill production plans succeed

 

    no circumstances arise that will prevent us from operating McArthur River/Key Lake, or Rabbit Lake once it has resumed operations, for the full period of our current licences

 

    JV Inkai’s development, mining and production plans succeed, and that JV Inkai will be able to deliver its production

 

    the ability of JV Inkai to pay dividends

 

    our production plan for our Port Hope UF6 conversion facility succeeds

 

    that care and maintenance costs will be as expected

 

    our and our contractors’ ability to comply with current and future environmental, safety and other regulatory requirements and to obtain and maintain required regulatory approvals

 

    neither our operations, nor those of our joint venture partners, suppliers or customers, are significantly disrupted as a result of political instability, nationalization, terrorism, sabotage, blockades, civil unrest, breakdown, climate change, natural disasters, forest or other fires, outbreak of illness (such as a pandemic like COVID-19), governmental, political or regulatory actions, litigation or arbitration proceedings, cyber-attacks, the unavailability of reagents, equipment, operating parts and supplies critical to production, labour shortages, labour relations issues, strikes or lockouts, health and safety issues, underground floods, increased loadings into the environment, cave-ins, ground movements, tailings dam failure, lack of tailings capacity, improper air emission or treated water releases, transportation disruptions or accidents, aging infrastructure, or other development or operating risk
 

 

4    CAMECO CORPORATION


Third quarter market update

Ongoing geopolitical events, the global focus on the climate crisis, and energy security concerns have created what we believe are transformative tailwinds for the nuclear power industry, from both a demand and supply perspective.

In the third quarter of 2023, uranium prices reached levels not seen since 2011, driven primarily by growing security of supply concerns. Fuel buyers continued contracting to secure their long-term requirements for conversion and enrichment services and have returned their focus to the uranium required to feed into those services, as evidenced by higher prices across the fuel cycle and long-term contracting that continues to be on track to achieve the rate required to replace what is being consumed annually (replacement-rate contracting).

Some of the more significant developments affecting supply in the quarter and to date include:

 

   

On September 3, Cameco provided an update to its 2023 production forecast at McArthur River/Key Lake and Cigar Lake. Total production for 2023 is anticipated to be up to 16.3 million pounds U3O8 (100% basis) at Cigar Lake (previously 18 million pounds U3O8) and 14 million pounds U3O8 (100% basis) at McArthur River/Key Lake (previously 15 million pounds U3O8). See Uranium 2023 Q3 updates starting on page 27 for more information.

 

   

Sprott Physical Uranium Trust (SPUT) has purchased nearly 3 million pounds U3O8 thus far in 2023, bringing total purchases since inception to nearly 44 million pounds U3O8. Volatility in equity markets has impacted whether SPUT is trading at a discount or premium to its net asset value which impacts its ability to raise funds to purchase uranium.

 

   

On September 26, an updated version of the Nuclear Fuel Security Act was reintroduced to the US House of Representatives. This House bill requires the Department of Energy (DOE) to conduct a study on the commercial availability of low-enriched uranium (LEU). If it concludes government spending is needed, DOE would be authorized to offer cost-shares and milestone payments to incentivize LEU production.

 

   

On July 26, a coup d’état occurred in Niger which resulted in a group of military officers removing President Mohamed Bazoum and seizing power. All exports of uranium and gold to France were suspended soon after. On September 8, Orano stated they had halted uranium processing operations at their majority-owned SOMAIR (Arlit) project in Niger due to logistical complications caused by international sanctions.

 

   

In September, Kazatomprom (KAP) stated plans to increase production in 2025 to 100% of subsoil agreements, producing a total of 79.3 million to 81.9 million pounds U3O8, an additional 28 million pounds U3O8 compared to 2023 planned production of 55.3 million to 55.9 million pounds U3O8. KAP indicated this production is already committed under long-term contracts and the decision is a result of better market conditions and increased contracting activities. However, KAP warned that geopolitical uncertainty, global supply chain issues and inflationary pressure could create challenges in achieving the planned production increase.

 

   

On August 31, Peninsula Energy Ltd. announced plans to restart production at their Lance in situ recovery (ISR) project in Wyoming in late 2024. They plan to produce roughly 1.1 million pounds U3O8 in 2025 with a gradual ramp up to 1.6 million to 1.8 million pounds U3O8 annually.

 

   

On September 5, Encore Energy Corp. announced plans to restart production at its South Texas Alta Mesa ISR facility in early 2024, and that production at its Rosita ISR facility remains on schedule to resume in 2023, with production capacity of 1.5 million pounds U3O8 and 800,000 pounds U3O8 at each site, respectively.

 

   

On October 11, Centrus Energy Corp. announced that it had begun enrichment operations to produce high-assay low-enriched uranium at its American Centrifuge Plant in Piketon, Ohio.

 

   

On October 18, Ur-Energy Inc. announced that the restart and ramp up of its Lost Creek ISR Facility is underway, although challenges with the recruitment and retention of employees and contractors have hampered efficient operations and initial work has therefore been slower than anticipated.

 

   

On October 19, Orano’s board of directors announced their approval of a production capacity extension project at Georges Besse 2. The project seeks to increase the production capacities by over 30% at the uranium enrichment plant in southeastern France.

 

2023 THIRD QUARTER REPORT    5


According to the International Atomic Energy Agency, globally, there are currently 437 operable reactors and 58 reactors under construction. Demand-related developments continue to indicate growing support for the nuclear industry, including nations reaffirming their commitment to existing nuclear and/or reversing policies to phase out nuclear, non-nuclear countries emerging as candidates for new nuclear capacity, improvements in global sustainable financing policies to include nuclear energy, and opinion polls showing growing public support. With a number of reactor construction projects approved and many more planned, demand for uranium fuel continues to improve.

The more significant developments in the quarter affecting current and future demand include:

 

   

In September, the World Nuclear Association released its Global Nuclear Fuel Report which provides scenarios for demand and supply availability across the fuel supply chain through 2040. This included a robust demand outlook showing global nuclear generating capacity increasing to 686 GWe in the Reference Scenario by 2040, an average annual growth rate of 3.6%, compared to 2.6% in the 2021 report. This improvement was driven by improved government support, life extensions, new builds and importantly, the expectation that starting in the 2030s, the deployment of small modular reactors (SMR) will contribute to capacity growth. Additional key themes include assumed reductions to secondary feed supply and availability of mobile inventories, along with a growing volume of future uranium supply at higher incentive pricing than today needed to balance the market after 2030.

 

   

On September 26, Westinghouse signed a contract with Liaoning Nuclear Power Co. Limited and China Nuclear Power Engineering Co. Limited to supply instrument and control systems for two future AP1000 units at Xudapu.

 

   

On September 20, Korea Hydro & Nuclear Power announced it successfully completed fuel loading at Shin Hanul unit 2, a new APR-1400 pressurized water reactor.

 

   

On August 28, Kansai Electric Power Co. announced that unit 1 of the Takahama nuclear power plant successfully cleared its final pre-operational safety inspection to restart and formally entered commercial operation.

 

   

Tokyo Electric Power Company (TEPCO) announced on August 22 that Japan’s government approved plans and issued its final decision allowing TEPCO to begin discharging treated water into the Pacific Ocean from storage at the Fukushima-Daiichi nuclear power plant in Fukushima Prefecture, Japan.

 

   

At the end of August, India’s first indigenously developed nuclear power plant, Kakrapar Unit 3, began operating at full capacity.

 

   

On August 30, Egypt’s regulatory authority approved final plans for a fourth 1,200 MWe reactor at El Dabaa Nuclear Power Plant.

 

   

Sweden’s plan to expand nuclear power was highlighted during International Atomic Energy Agency Director General Grossi’s visit in August. The new government aims to expand the role of nuclear power in Sweden over the coming two decades, implementing legal changes aimed at paving the way for such an energy transformation.

 

   

In Poland, Polskie Elektrownie Jądrowe, announced in August its intention to go carbon neutral by 2040, ten years earlier than previously planned. Additionally in September, Westinghouse and Bechtel announced they signed a formal partnership agreement for the design and construction of a nuclear power plant at the Lubiatowo-Kopalino site, with the first of three units expected to begin commercial operation in 2033.

 

   

In Slovakia, Électricité de France (EDF) and JAVYS, the state-owned nuclear company, signed a framework cooperation agreement that involves nuclear projects in Slovakia, including both large-scale reactors and SMRs. Additionally, in September, Slovakian utility Slovenské Elektrárne announced it increased the power output of the new unit at the Mochovce nuclear power plant to 100% capacity.

 

   

In Romania, it was announced on September 19 that the Canadian federal government would support Romania’s energy security through a $3 billion export financing commitment to the country’s nuclear utility Nuclearelectrica SA. Since the 1970’s, Romania has used Canadian heavy-water reactor technology (CANDU) for its nuclear program. This funding will help complete the partially built CANDU-6 units 3 and 4.

 

   

In the United Kingdom (UK), EDF, who is building Hinkley Point C, announced potential delays due to construction setbacks at the plant in July. At this time, they warned the units may start up to 15 months late. Additionally, on September 21, EDF announced the creation of a new subsidiary known as EDF EPR Engineering UK. The new entity incorporates nuclear energy focused teams already present in the UK whose core task is to contribute to the engineering studies for Hinkley Point C.

 

   

On August 23, the UK Department for Energy Security and Net Zero along with UK Export Finance issued a press release announcing a loan guarantee of $245 million (US) for Ukraine to purchase nuclear fuel and help end its reliance on Russian imports.

 

6    CAMECO CORPORATION


   

In Ghana, Nuclear Power Ghana announced in September it selected the nation’s first two nuclear power plant locations.

 

   

On September 25, Kenya’s Nuclear Power and Energy Agency said they plan to begin construction on its first commercial nuclear power plant in 2027. They have advanced plans to launch a tender for this reactor in 2026 or 2027, with a construction start date in 2027.

 

   

In Canada, New Brunswick Power signed a three-year contract with Ontario Power Generation to help enhance the operational performance of the Point Lepreau nuclear power plant. Additionally, in August, Crown Investments Corporation provided around $479,000 to help Saskatchewan firms build small, advanced, and micro reactors (SAMR) supply chain capacity, while the Alberta government announced it plans to invest around $7 million to study SAMRs.

 

   

On September 13, Brazilian nuclear utility Eletronuclear announced that civil construction works on unit 3 at the Angra nuclear power plant in Rio de Janeiro have been halted due to a funding dispute.

 

   

In the United States, Southern announced Vogtle Unit 3 entered commercial service on July 31.

 

   

On August 24, Tennessee Valley Authority’s board of directors approved $15 billion (US) in new investments over the next three years to boost generating capacity and upgrade the existing energy system.

 

   

The DOE announced 106 awards to small businesses, totaling $126 million (US) in research and development grants to be used to pursue clean energy via multiple mission areas, including nuclear and fusion energy projects.

 

   

On September 19, US utility Vistra Energy announced it plans to sell the Richmond and Stryker fossil-fueled power plants in Ohio to help clear the path to complete a $6.3 billion (US) merger process launched in March to acquire Ohio-based nuclear operator Energy Harbor.

 

   

On August 24, Xcel Energy announced it received the necessary state approvals to extend operations of the Monticello nuclear power plant through 2040 by allowing the company to increase its onsite storage of spent nuclear fuel.

 

 

Caution about forward-looking information relating to the nuclear industry

This discussion of our expectations for the nuclear industry, including its growth profile, uranium supply and demand, and reactor growth is forward-looking information that is based upon the assumptions and subject to the material risks discussed under the heading Caution about forward-looking information beginning on page 2.

Industry prices at quarter end

 

     SEP 30
2023
     JUN 30
2023
     MAR 31
2023
     DEC 31
2022
     SEP 30
2022
     JUN 30
2022
 

Uranium ($US/lb U3O8)1

                 

Average spot market price

     71.58        56.10        50.48        47.68        48.38        49.75  

Average long-term price

     61.50        56.00        53.00        52.00        51.00        51.50  

Fuel services ($US/kgU as UF6)1

                 

Average spot market price

                 

North America

     40.88        40.75        39.75        40.00        38.00        32.75  

Europe

     40.88        40.75        39.75        40.00        38.00        32.75  

Average long-term price

                 

North America

     31.50        30.75        27.88        27.25        26.75        26.25  

Europe

     31.50        30.50        27.88        27.50        27.00        26.50  
Note: the industry does not publish UO2 prices.                  

 

1 

Average of prices reported by TradeTech and UxC LLC (UxC)

On the spot market, where purchases call for delivery within one year, the volume reported by UxC for the third quarter of 2023 was almost 13 million pounds U3O8 equivalent, compared to 9 million pounds U3O8 equivalent contracted in the third quarter of 2022. As of September 30, 2023, the average reported spot price was $71.58 (US) per pound, an increase of $15.48 (US) per pound from the previous quarter.

 

2023 THIRD QUARTER REPORT    7


Long-term contracts generally call for deliveries to begin more than two years after the contract is finalized, and use a number of pricing formulas, including base-escalated prices set at time of contracting and escalated over the term of the contract, and market-related prices, which reference spot and/or long-term indicators determined near the time of delivery. Long-term contracting reported by UxC for the first nine months of 2023 totaled about 144 million pounds U3O8 equivalent, up from about 80 million pounds U3O8 equivalent reported over the same period in 2022. Total long-term contracting volumes to date in 2023 has already exceeded the volume of each of the last 10 years, a strong indication that a new long-term contracting cycle is underway. The average reported long-term price at the end of the quarter was $61.50 (US) per pound U3O8 equivalent, an increase of $5.50 (US) per pound from the previous quarter.

With the increased demand for conversion services, pricing in both North America and Europe continues to be strong. As of the end of the third quarter, the average reported spot price reached a record high of $40.88 (US) per kilogram uranium (kgU) as UF6, up $0.13 (US) from the previous quarter. Long-term UF6 conversion prices for North America finished the quarter at $31.50 (US) per kgU, up $0.75 (US) from the previous quarter.

 

8    CAMECO CORPORATION


Our strategy

We are a pure-play investment in the growing demand for nuclear energy. We are focused on providing nuclear fuel products and services across the fuel cycle to support the generation of clean, reliable, secure and affordable energy, and we are focused on taking advantage of the long-term growth we see coming in our industry. Our strategy is set within the context of what we believe is a transitioning market environment, where increasing populations, a growing focus on electrification and decarbonization, and concerns about energy security and affordability are expected to durably strengthen the long-term fundamentals for nuclear power and the uranium and fuel services needed to run the reactors. We believe nuclear energy must be a significant component of the world’s shift to a low-carbon, climate resilient economy. It is an option that can provide the necessary power in a reliable, safe and affordable manner, and in a way that will help avoid some of the worst consequences of climate change.

Our strategy is to capture full-cycle value by:

 

   

remaining disciplined in our contracting activity, building a balanced portfolio in accordance with our contracting framework;

 

   

profitably producing from our tier-one assets and aligning our production decisions in all segments of our business with our contract portfolio and customer needs;

 

   

being financially disciplined to allow us to execute on our strategy, take advantage of strategic opportunities and to self-manage risk, and

 

   

exploring other emerging and non-traditional opportunities within the fuel cycle that align with our commitment to responsibly and sustainably manage our business, contribute to the mitigation of global climate change, and help to provide energy security and affordability

We expect our strategy will allow us to increase long-term value, and we will execute it with an emphasis on safety, people and the environment.

Our vision – “Energizing a clean-air world” – recognizes that we have an important role to play in enabling the vast reductions in global greenhouse gas (GHG) emissions required to achieve a resilient net-zero carbon economy. We support climate action that is consistent with the ambitions of the Paris Agreement and the Canadian government’s commitment to the agreement, which seeks to limit global temperature rise to less than 2° Celsius, a target that climate scientists believe will require the world to reach net-zero emissions by 2050 or sooner. Our uranium and fuel services are used around the world in the generation of safe, carbon-free, affordable, base-load nuclear power.

We believe we have the right strategy to achieve our vision and we will do so in a manner that reflects our values. For over 30 years, we have been operating and delivering our products responsibly. Building on that strong foundation, we have set a new target to reduce our combined Scope 1 and Scope 2 GHG emissions by 30% by 2030, from our 2015 baseline as our first major milestone on the journey to achieve our ambition of being net-zero. We remain committed to our efforts to transform our own, already low, greenhouse gas footprint in our ambition to reach net-zero emissions, and identifying and addressing the environmental, social, and governance (ESG) risks and opportunities that we believe may have a significant impact on our ability to add long-term value for our stakeholders.

You can read more about our strategy in our 2022 annual MD&A and our approach to ESG in our 2022 ESG report.

 

2023 THIRD QUARTER REPORT    9


Strategy in action

In September, we provided a production update reducing our 2023 uranium production outlook from 33 million pounds (20.3 million pounds our share) to up to 30.3 million pounds (up to 18.7 million pounds our share). See Uranium 2023 Q3 updates starting on page 27 for more information. This expected production shortfall further highlights the growing security of supply risk at a time when we believe the demand outlook is stronger and more durable than ever and where we believe the risk to uranium supply is greater than the risk to uranium demand. We expect the uncertainty about where nuclear fuel supplies will come from to satisfy growing demand will continue to drive a renewed focus on long-term contracting to ensure availability of supply to fuel nuclear reactors. With the improvements in the market, the new long-term contracts we have put in place, and a pipeline of contracting discussions, we maintain our plans to increase uranium production to 36 million pounds (22.4 million pounds our share) starting in 2024. At Inkai, production will continue to follow the 20% reduction planned by Kazatomprom until the end of 2023. In addition to our uranium production plans, our Port Hope UF6 conversion facility is working to increase annual production to 12,000 tonnes of UF6 by 2024, in order to satisfy our book of long-term business and demand for conversion services, at a time when conversion prices are at historic highs.

We continue to have the ability to expand production from our existing assets, however some additional investment would be required. If we took advantage of all tier-one expansion opportunities, our annual share of tier-one uranium supply could be about 32 million pounds (including our share of production from McArthur River/Key Lake and Cigar Lake, and Inkai purchases). However, we will continue to responsibly manage our supply in accordance with our contract portfolio and our customers’ needs.

With increasing supply risk caused by production challenges and heightened geopolitical uncertainty, utilities are evaluating their nuclear fuel supply chains. Our utility customers’ nuclear power plants continue to be part of the critical infrastructure needed to guarantee the availability of 24-hour electricity to run essential services. Our customers are going to need nuclear fuel to allow them to continue to provide carbon-free baseload electricity. As a reliable, commercial supplier, with nuclear fuel assets in geopolitically stable jurisdictions, we are focused on working with our customers to secure long-term commitments that will underpin the long-term operation of our productive capacity, while helping de-risk their nuclear fuel supply chains.

We are also focused on adding new markets to our global commercial portfolio. We are successfully competing for business in countries seeking to enhance their energy security, while affirming their commitment to carbon-free nuclear power in achieving their climate goals.

In recent years, the volumes we have placed under long-term agreements have exceeded our annual delivery volumes. With our contracting success, we are heavily committed under long-term contracts. As of September 30, 2023, we had commitments requiring delivery of an average of about 29 million pounds per year from 2023 through 2027, an increase from an average of about 28 million pounds per year at the end of June. Commitment levels in 2023 through 2025 are higher than the average and in 2026 and 2027 lower than the average. We also have contracts in our uranium and fuel services segments that have deliveries spanning more than a decade, and in our uranium segment, many of our contracts benefit from market-related pricing mechanisms. In addition, we have a large and growing pipeline of business under discussion, which we expect will help further build our long-term portfolio. With about 144 million pounds of long-term contracting industry-wide so far this year, we believe there is clear evidence that the broader uranium market is moving toward replacement-rate contracting reflecting security of supply concerns. This is the type of contracting necessary to promote the price discovery already seen in the enrichment and conversion markets and that will incentivize investments in the supply necessary to satisfy the growing long-term requirements. Therefore, we remain selective in committing our unencumbered, in-ground uranium inventory and UF6 conversion capacity under long-term contracts to help maintain additional exposure to future improvements in the market.

We continue to meet our sales commitments through a combination of production, inventory, purchases and product loans. In the first nine months of 2023, we produced 11.9 million pounds of uranium (our share) and purchased 5 million pounds. The average unit cost of our purchases was $69.88 per pound ($51.58 per pound (US)). See Financial results by segment – Uranium starting on page 23 for more information.

Thanks to the disciplined execution of our strategy, our balance sheet is strong. As of September 30, 2023, we had $2.7 billion in cash and cash equivalents, and $1.0 billion in total debt. We also have a $1.0 billion undrawn credit facility. Our current cash balance is in excess of our normal working capital requirements and is expected to be used to help finance the pending acquisition of Westinghouse. See Pending acquisition of Westinghouse on page 30.

 

10    CAMECO CORPORATION


In October, pursuant to a cost award from the courts, we received a payment of approximately $12 million for disbursements from Canada Revenue Agency (CRA), which is in addition to the $10 million we received as reimbursement for legal fees in 2021. See Transfer pricing dispute on page 15 for more information.

We expect to maintain the financial strength and flexibility necessary to execute our strategy by being disciplined and planning production in coordination with contracting success and market opportunities, and by taking advantage of value-added growth opportunities, while continuing to navigate by our investment grade rating to self-manage risk, including risks related to global macro-economic uncertainty and volatility.

 

2023 THIRD QUARTER REPORT    11


Financial results

This section of our MD&A discusses our performance, financial condition and outlook for the future.

In the second quarter of 2022, we, along with Orano, acquired Idemitsu Canada Resources Ltd.’s 7.875% participating interest in the Cigar Lake Joint Venture. Our ownership stake in Cigar Lake is now 54.547%, which is 4.522% higher than it was prior to the transaction. Effective May 19, 2022, we have reflected our share of production and financial results based on this new ownership stake.

Consolidated financial results

 

HIGHLIGHTS    THREE MONTHS
ENDED SEPTEMBER 30
          NINE MONTHS
ENDED SEPTEMBER 30
        

($ MILLIONS EXCEPT WHERE INDICATED)

   2023      2022     CHANGE     2023      2022      CHANGE  

Revenue

     575        389       48     1,744        1,344        30

Gross profit

     152        25       >100     429        168        >100

Net earnings (losses) attributable to equity holders

     148        (20     >100     281        105        >100

$ per common share (basic)

     0.34        (0.05     >100     0.65        0.26        >100

$ per common share (diluted)

     0.34        (0.05     >100     0.65        0.26        >100

Adjusted net earnings (non-IFRS, see page 13)

     137        10       >100     249        100        >100

$ per common share (adjusted and diluted)

     0.32        0.03       >100     0.57        0.25        >100

Cash provided by (used in) operations (after working capital changes)

     185        (47     >100     487        227        >100

NET EARNINGS

The following table shows what contributed to the change in net earnings and adjusted net earnings (non-IFRS measure, see page 13) in the third quarter and the first nine months of 2023, compared to the same periods in 2022.

 

          THREE MONTHS
ENDED SEPTEMBER 30
     NINE MONTHS
ENDED SEPTEMBER 30
 

($ MILLIONS)

   IFRS      ADJUSTED      IFRS      ADJUSTED  

Net earnings (losses) - 2022

     (20      10        105        100  
  

 

 

    

 

 

    

 

 

    

 

 

 

Change in gross profit by segment

           

(We calculate gross profit by deducting from revenue the cost of products and services sold, and depreciation and amortization (D&A), net of hedging benefits)

           

Uranium

   Impact from sales volume changes      6        6        18        18  
   Higher realized prices ($US)      56        56        93        93  
   Foreign exchange impact on realized prices      18        18        75        75  
   Lower costs      40        40        66        66  
     

 

 

    

 

 

    

 

 

    

 

 

 
   Change – uranium      120        120        252        252  
     

 

 

    

 

 

    

 

 

    

 

 

 

Fuel services

   Impact from sales volume changes      —         —         5        5  
   Higher realized prices ($Cdn)      14        14        24        24  
   Higher costs      (8      (8      (20      (20
     

 

 

    

 

 

    

 

 

    

 

 

 
   Change – fuel services      6        6        9        9  
     

 

 

    

 

 

    

 

 

    

 

 

 

Other changes

           

Higher administration expenditures

     (5      (5      (44      (44

Higher exploration expenditures

     (1      (1      (6      (6

Change in reclamation provisions

     36        12        (10      10  

Higher earnings from equity-accounted investee

     26        26        22        22  

Change in gains or losses on derivatives

     26        (8      75        (20

Change in foreign exchange gains or losses

     3        3        (60      (60

Higher finance income

     25        25        77        77  

Bargain purchase gain on CLJV ownership interest increase

     —         —         (23      —   

Change in income tax recovery or expense

     (66      (49      (100      (75

Other

     (2      (2      (16      (16
  

 

 

    

 

 

    

 

 

    

 

 

 

Net earnings - 2023

     148        137        281        249  
  

 

 

    

 

 

    

 

 

    

 

 

 

See Financial results by segment on page 23 for more detailed discussion.

 

12    CAMECO CORPORATION


ADJUSTED NET EARNINGS (NON-IFRS MEASURE)

Adjusted net earnings (ANE) is a measure that does not have a standardized meaning or a consistent basis of calculation under IFRS (non-IFRS measure). We use this measure as a meaningful way to compare our financial performance from period to period. Adjusted net earnings is our net earnings attributable to equity holders, adjusted to reflect the underlying financial performance for the reporting period. We believe that, in addition to conventional measures prepared in accordance with IFRS, certain investors use this information to evaluate our performance. Adjusted net earnings is one of the targets that we measure to form the basis for a portion of annual employee and executive compensation (see Measuring our results starting on page 36 of our 2022 annual report).

In calculating ANE we adjust for derivatives. We do not use hedge accounting under IFRS and, therefore, we are required to report gains and losses on all hedging activity, both for contracts that close in the period and those that remain outstanding at the end of the period. For the contracts that remain outstanding, we must treat them as though they were settled at the end of the reporting period (mark-to-market). However, we do not believe the gains and losses that we are required to report under IFRS appropriately reflect the intent of our hedging activities, so we make adjustments in calculating our ANE to better reflect the impact of our hedging program in the applicable reporting period. See Foreign exchange starting on page 17 for more information.

We also adjust for changes to our reclamation provisions that flow directly through earnings. Every quarter we are required to update the reclamation provisions for all operations based on new cash flow estimates, discount and inflation rates. This normally results in an adjustment to an asset retirement obligation asset in addition to the provision balance. When the assets of an operation have been written off due to an impairment, as is the case with our Rabbit Lake and US ISR operations, the adjustment is recorded directly to the statement of earnings as “other operating expense (income)”. See note 9 of our interim financial statements for more information. This amount has been excluded from our ANE measure.

The bargain purchase gain that was recognized when we acquired our pro-rata share of Idemitsu Canada Resources Ltd.’s 7.875% participating interest in the Cigar Lake Joint Venture has also been removed in calculating ANE since it is non-cash, non-operating and outside of the normal course of our business. The gain was recorded in the statement of earnings as part of “other income (expense)”.

Adjusted net earnings is a non-IFRS financial measure and should not be considered in isolation or as a substitute for financial information prepared according to accounting standards. Other companies may calculate this measure differently, so you may not be able to make a direct comparison to similar measures presented by other companies.

The following table reconciles adjusted net earnings with net earnings for the third quarter and first nine months of 2023 and compares it to the same periods in 2022.

 

     THREE MONTHS
ENDED SEPTEMBER 30
     NINE MONTHS
ENDED SEPTEMBER 30
 

($ MILLIONS)

   2023      2022      2023      2022  

Net earnings (losses) attributable to equity holders

     148        (20      281        105  
  

 

 

    

 

 

    

 

 

    

 

 

 

Adjustments

           

Adjustments on derivatives

     41        75        —         95  

Adjustment to other operating income

     (48      (24      (42      (62

Adjustment to other income

     —         —         —         (23

Income taxes on adjustments

     (4      (21      10        (15
  

 

 

    

 

 

    

 

 

    

 

 

 

Adjusted net earnings

     137        10        249        100  
  

 

 

    

 

 

    

 

 

    

 

 

 

 

2023 THIRD QUARTER REPORT    13


Quarterly trends

 

HIGHLIGHTS    2023      2022      2021  

($ MILLIONS EXCEPT PER SHARE AMOUNTS)

   Q3      Q2     Q1      Q4     Q3     Q2      Q1      Q4  

Revenue

     575        482       687        524       389       558        398        465  

Net earnings (losses) attributable to equity holders

     148        14       119        (15     (20     84        40        11  

$ per common share (basic)

     0.34        0.03       0.27        (0.04     (0.05     0.21        0.10        0.03  

$ per common share (diluted)

     0.34        0.03       0.27        (0.04     (0.05     0.21        0.10        0.03  

Adjusted net earnings (losses) (non-IFRS, see page 13)

     137        (3     115        36       10       72        17        23  

$ per common share (adjusted and diluted)

     0.32        (0.01     0.27        0.09       0.03       0.18        0.04        0.06  

Cash provided by (used in) operations (after working capital changes)

     185        87       215        77       (47     102        172        59  

Key things to note:

 

   

the timing of customer requirements, which tend to vary from quarter to quarter, drives revenue in the uranium and fuel services segments, meaning quarterly results are not necessarily a good indication of annual results due to seasonal variability

 

   

net earnings do not trend directly with revenue due to unusual items and transactions that occur from time to time. We use adjusted net earnings, a non-IFRS measure, as a more meaningful way to compare our results from period to period (see page 13 for more information).

 

   

cash from operations tends to fluctuate as a result of the timing of deliveries and product purchases in our uranium and fuel services segments

The following table compares the net earnings and adjusted net earnings for the first quarter to the previous seven quarters.

 

HIGHLIGHTS    2023     2022     2021  

($ MILLIONS EXCEPT PER SHARE AMOUNTS)

   Q3     Q2     Q1     Q4     Q3     Q2     Q1     Q4  

Net earnings (losses) attributable to equity holders

     148       14       119       (15     (20     84       40       11  

Adjustments

                

Adjustments on derivatives

     41       (35     (6     (19     75       31       (11     5  

Adjustment to other operating income

     (48     8       (2     88       (24     (19     (19     10  

Adjustment to other income

     —        —        —        —        —        (23     —        —   

Income taxes on adjustments

     (4     10       4       (18     (21     (1     7       (3
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Adjusted net earnings (losses) (non-IFRS, see page 13)

     137       (3     115       36       10       72       17       23  
  

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

   

 

 

 

Corporate expenses

ADMINISTRATION

 

     THREE MONTHS
ENDED SEPTEMBER 30
           NINE MONTHS
ENDED SEPTEMBER 30
        

($ MILLIONS)

   2023      2022      CHANGE     2023      2022      CHANGE  

Direct administration

     45        38        18     137        105        30

Stock-based compensation

     21        23        (9 )%      50        34        47

Reversal (recovery) of fees related to CRA dispute

     —         —         —        —         4        (100 )% 
  

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

 

Total administration

     66        61        8     187        143        31
  

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

 

Direct administration costs were $7 million higher for the third quarter of 2023 compared to the same period last year, and $32 million higher for the first nine months largely due to the impacts of inflation and higher costs as a result of digital initiatives. Stock-based compensation in the first nine months of 2023 was $16 million higher than 2022 due to the increase in our share price from the comparative period. See note 17 to the financial statements.

 

14    CAMECO CORPORATION


EXPLORATION AND RESEARCH & DEVELOPMENT

In the third quarter, uranium exploration expenses were $4 million, an increase of $1 million from the third quarter of 2022. Exploration expenses for the first nine months of the year increased by $6 million compared to 2022, to $14 million.

We also had research and development expenditures in the third quarter of $8 million, an increase of $5 million from the third quarter of 2022. Research and development expenses for the first nine months of the year increased by $8 million compared to 2022, to $17 million. These expenses are related to our investment in Global Laser Enrichment, LLC.

INCOME TAXES

We recorded an income tax expense of $41 million in the third quarter of 2023, compared to a recovery of $25 million in the third quarter of 2022.

In the first nine months of 2023, we recorded an expense of $100 million compared to no expense in 2022.

 

     THREE MONTHS
ENDED SEPTEMBER 30
     NINE MONTHS
ENDED SEPTEMBER 30
 

($ MILLIONS)

   2023      2022      2023      2022  

Net earnings (loss) before income taxes

           

Canada

     162        (87      373        79  

Foreign

     27        42        8        26  
  

 

 

    

 

 

    

 

 

    

 

 

 

Total net earnings before income taxes

     189        (45      381        105  
  

 

 

    

 

 

    

 

 

    

 

 

 

Income tax expense (recovery)

           

Canada

     39        (27      93        (5

Foreign

     2        2        7        5  
  

 

 

    

 

 

    

 

 

    

 

 

 

Total income tax expense

     41        (25      100        —   
  

 

 

    

 

 

    

 

 

    

 

 

 

TRANSFER PRICING DISPUTE

Background

Since 2008, Canada Revenue Agency (CRA) has disputed our marketing and trading structure and the related transfer pricing methodology we used for certain intercompany uranium sale and purchase agreements.

For the years 2003 to 2014, CRA shifted Cameco Europe Limited’s income (as recalculated by CRA) back to Canada and applied statutory tax rates, interest and instalment penalties, and, from 2007 to 2011, transfer pricing penalties. In addition, for 2014 to 2016, CRA has advanced an alternate reassessing position, see Reassessments, remittances and next steps below for more information.

In September 2018, the Tax Court of Canada (Tax Court) ruled that our marketing and trading structure involving foreign subsidiaries, as well as the related transfer pricing methodology used for certain intercompany uranium sales and purchasing agreements, were in full compliance with Canadian law for the tax years in question (2003, 2005 and 2006). On June 26, 2020, the Federal Court of Appeal (Court of Appeal) upheld the Tax Court’s decision.

On February 18, 2021, the Supreme Court of Canada (Supreme Court) dismissed CRA’s application for leave to appeal the June 26, 2020, decision of the Court of Appeal. The dismissal means that the dispute for the 2003, 2005 and 2006 tax years is fully and finally resolved in our favour. Although not technically binding, there is nothing in the reasoning of the lower court decisions that should result in a different outcome for the 2007 through 2014 tax years, which were reassessed on the same basis.

Refund and cost award

The Minister of National Revenue issued new reassessments for the 2003 through 2006 tax years in accordance with the decision and in July 2021, refunded the tax paid for those years. In October, pursuant to a cost award from the courts, we received a payment of approximately $12 million for disbursements, which is in addition to the $10 million we received from CRA in April 2021 as reimbursement for legal fees.

 

2023 THIRD QUARTER REPORT    15


Reassessments, remittances and next steps

The Canadian income tax rules include provisions that generally require larger companies like us to remit or otherwise secure 50% of the cash tax plus related interest and penalties at the time of reassessment. Following the Supreme Court’s dismissal of CRA’s application for leave to appeal, we wrote to CRA requesting reversal of CRA’s transfer pricing adjustments for 2007 through 2013 and the return of the $780 million in cash and letters of credit we have paid or provided for those years. Given the strength of the court decisions received, our request was made on the basis that the Tax Court would reject any attempt by CRA to defend its reassessments for the 2007 through 2013 tax years applying the same or similar positions already denied for previous years.

In March, CRA issued revised reassessments for the 2007 through 2013 tax years, which resulted in a refund of $297 million of the $780 million in cash and letters of credit held by CRA at the time. The refund consisted of cash in the amount of $86 million and letters of credit in the amount of $211 million, which were returned in the second quarter. CRA continues to hold $483 million ($209 million in cash and $274 million in letters of credit) that Cameco has remitted or secured to date.

The series of court decisions that were completely and unequivocally in our favour for the 2003, 2005 and 2006 tax years, determined that the income earned by our foreign subsidiary from the sale of non-Canadian produced uranium was not taxable in Canada. In accordance with these decisions, CRA issued reassessments reducing the proposed transfer pricing adjustment from $5.1 billion to $3.3 billion, resulting in a reduction of $1.8 billion in income taxable in Canada compared to the previous reassessments issued to us by CRA for the 2007 through 2013 tax years.

The remaining transfer pricing adjustment of $3.3 billion for the 2007 to 2013 tax years relates to the sale of Canadian-produced uranium by our foreign subsidiary. Cameco maintains that the clear and decisive court decisions described above apply, and that CRA should fully reverse the remaining transfer pricing adjustments for these years and return the cash and security being held.

In October 2021, due to a lack of significant progress on our points of contention, we filed a notice of appeal with the Tax Court for the years 2007 through 2013. We have asked the Tax Court to order the complete reversal of CRA’s transfer pricing adjustment for those years and the return of the remainder of our cash and letters of credit being held, with costs.

In 2020, CRA advanced an alternate reassessing position for the 2014 tax year in the event the basis for its original reassessment, noted above, is unsuccessful. Subsequent to this, in 2021, we received a reassessment for the 2015 tax year and in late 2022, we received a reassessment for the 2016 tax year, both using this alternative reassessing position. The new basis of reassessment is inconsistent with the methodology CRA has pursued for prior years and we are disputing it separately. Our view is that this alternate methodology will not result in a materially different outcome from our 2014 to 2016 filing positions. On October 12, 2022, we filed an appeal with the Tax Court for the years 2014 and 2015, and in March 2023, filed a notice of objection for 2016. CRA did not require additional security for the tax debts they considered owing for 2014, 2015 and 2016.

We will not be in a position to determine the definitive outcome of this dispute for any tax year other than 2003 through 2006 until such time as all reassessments have been issued advancing CRA’s arguments and final resolution is reached for that tax year. CRA may also advance alternative reassessment methodologies for years other than 2003 through 2006, such as the alternative reassessing position advanced for 2014 through 2016.

 

 

Caution about forward-looking information relating to our CRA tax dispute

This discussion of our expectations relating to our tax dispute with CRA and future tax reassessments by CRA is forward-looking information that is based upon the assumptions and subject to the material risks discussed under the heading Caution about forward-looking information beginning on page 2.

 

16    CAMECO CORPORATION


FOREIGN EXCHANGE

The exchange rate between the Canadian dollar and US dollar affects the financial results of our uranium and fuel services segments.

We sell the majority of our uranium and fuel services products under long-term sales contracts, which are routinely denominated in US dollars. While our product purchases are largely denominated in US dollars, our production costs are largely denominated in Canadian dollars. To provide cash flow predictability, we hedge a portion of our net US/Cdn exposure (e.g. total US dollar sales less US dollar expenditures and product purchases) to manage shorter term exchange rate volatility. Our results are therefore affected by the movements in the exchange rate on our hedge portfolio, and on the unhedged portion of our net exposure.

Impact of hedging on IFRS earnings

We do not use hedge accounting under IFRS and we are therefore required to report gains and losses on economic hedging activity, both for contracts that close in the period and those that remain outstanding at the end of the period. For the contracts that remain outstanding, we must treat them as though they were settled at the end of the reporting period (mark-to-market).

However, we do not believe the gains and losses that we are required to report under IFRS appropriately reflect the intent of our hedging activities, so we make adjustments in calculating our ANE to better reflect the benefits of our hedging program in the applicable reporting period.

Impact of hedging on ANE

We designate contracts for use in particular periods, based on our expected net exposure in that period. Hedge contracts are layered in over time based on this expected net exposure. The result is that our current hedge portfolio is made up of a number of contracts which are currently designated to net exposures we expect in 2023 and future years, and we will recognize the gains and losses in ANE in those periods.

For the purposes of ANE, gains and losses on derivatives are reported based on the difference between the effective hedge rate of the contracts designated for use in the particular period and the exchange rate at the time of settlement. This results in an adjustment to current period IFRS earnings to effectively remove reported gains and losses on derivatives that arise from contracts put in place for use in future periods. The effective hedge rate will lag the market in periods of rapid currency movement. See Non-IFRS measures on page 13.

For more information, see our 2022 annual MD&A.

At September 30, 2023:

 

   

The value of the US dollar relative to the Canadian dollar was $1.00 (US) for $1.36 (Cdn), up from $1.00 (US) for $1.32 (Cdn) at June 30, 2023. The exchange rate averaged $1.00 (US) for $1.34 (Cdn) over the quarter.

 

   

The mark-to-market position on all foreign exchange contracts was a $48 million loss compared to a $7 million loss at June 30, 2023.

For information on the impact of foreign exchange on our intercompany balances, see note 18 to the financial statements.

 

2023 THIRD QUARTER REPORT    17


Outlook for 2023

Our outlook for 2023 is beginning to reflect the transition of our cost structure back to a tier-one run rate, as we plan our production to satisfy the growing long-term commitments under our contract portfolio. With our plan to produce 18 million pounds per year (100% basis) at both Cigar Lake and at McArthur River/Key Lake in 2024, and to increase production at our Port Hope UF6 conversion facility, we expect to see continued improvement in our financial performance.

From a cash perspective, we expect to generate strong cash flows. However, cash balances will be dependent on the timing and volume of production, the timing, magnitude and source of our purchasing activity, and the timing of the close of the Westinghouse acquisition.

As in prior years, we will incur care and maintenance costs for the ongoing curtailment of our tier-two assets, which are expected to be between $50 million and $60 million.

As a result of lower production expectations from Cigar Lake and from McArthur River/Key Lake, we now expect to produce up to 18.7 million pounds (our share) in 2023. Please see Uranium 2023 Q3 updates on page 27 for more information. Due to the continued upward movement in the uranium spot price, we have updated our outlook for the anticipated uranium average realized price to $65.50 per pound (previously $63.80 per pound). With the updates to sales price, we now expect uranium revenue to be between $2,040 million and $2,130 million (previously $1,990 million to $2,080 million) and expected consolidated revenue to between $2,430 million and $2,580 million (previously $2,380 million to $2,530 million).

The average unit cost of sales in our uranium segment is now expected to be between $52.00 and $53.00 per pound (previously $49.00 and $51.00 per pound) due to the lower production expectations and the impact of the uranium spot price on our purchasing activity.

2023 FINANCIAL OUTLOOK

 

     CONSOLIDATED      URANIUM     FUEL SERVICES  

Production (owned and operated properties)

     —         up to 18.7 million lbs       13 to 14 million kgU  

Purchases

     —         11 to 13 million lbs       —   

Sales/delivery volume

     —         31 to 33 million lbs       11.5 to 12.5 million kgU  

Revenue

   $ 2,430-2,580 million      $ 2,040-2,130 million     $ 390-420 million  

Average realized price

     —       $ 65.50/lb       —   

Average unit cost of sales (including D&A)

     —       $ 52.00-53.00/lb 1    $ 23.50-24.50/kgU 2 

Direct administration costs

   $ 180-190 million        —        —   

Exploration costs

     —       $ 18 million       —   

Capital expenditures

   $ 150-175 million        —        —   

 

1 

Uranium average unit cost of sales is calculated as the cash and non-cash costs of the product sold, care and maintenance and selling costs, divided by the volume of uranium concentrates sold.

2 

Fuel services average unit cost of sales is calculated as the cash and non-cash costs of the product sold, transportation and weighing and sampling costs, divided by the volume of products sold.

We do not provide an outlook for the items in the table that are marked with a dash.

The following assumptions were used to prepare the outlook in the table above:

 

   

Production – we achieve 18.7 million pounds of production (our share) in our uranium segment. If we do not achieve 18.7 million pounds, the outlook for the uranium segment may change.

 

   

Purchases – are based on the volumes we currently have commitments to acquire under contract in 2023, including our JV Inkai purchases, and it includes additional volumes we are required to purchase in order to meet the sales/delivery commitments we have under contract in 2023 and maintain a working inventory. It does not include any purchases that we may make as a result of the impact of any delays or disruptions to production for any reason, including disruptions caused by supply chain or transportation, or other issues.

 

18    CAMECO CORPORATION


   

Our 2023 outlook for sales/delivery volume and revenue does not include sales between our uranium and fuel services segments.

 

   

Sales/delivery volume is based on the volumes already delivered this year and the remaining commitments we have to deliver under contract in 2023.

 

   

Uranium revenue and average realized price are based on a uranium spot price of $70.00 (US) per pound (the UxC spot price as of September 25, 2023), a long-term price indicator of $61.00 (US) per pound (the UxC long-term indicator on September 25, 2023) and an exchange rate of $1.00 (US) for $1.33 (Cdn).

 

   

Uranium average unit cost of sales (including D&A) is based on the expected unit cost of sales for produced material, the planned purchases noted in the outlook at an anticipated average purchase price of about $72.40 (Cdn) per pound (previously $68.90 (Cdn) per pound) and includes care and maintenance costs of between $50 million and $60 million. We expect overall unit cost of sales could vary if there are changes in production and purchase volumes or the mix between spot and long-term purchases, uranium spot prices, and/or care and maintenance costs in 2023.

 

   

Direct administration costs do not include stock-based compensation expenses. See page 14 for more information.

Our 2023 financial outlook is presented on the basis of equity accounting for our minority ownership interest in JV Inkai. Under equity accounting, our share of the profits earned by JV Inkai on the sale of its production to the JV partners will be included in “income from equity-accounted investees” on our consolidated statement of earnings. Our share of production will be purchased at a discount to the spot price and included at this value in inventory. In addition, JV Inkai capital is not included in our outlook for capital expenditures.

For more information on how changes in the exchange rate or uranium prices can impact our outlook see Revenue, adjusted net earnings, and cash flow sensitivity analysis below, and Foreign exchange on page 17.

REVENUE, ADJUSTED NET EARNINGS, AND CASH FLOW SENSITIVITY ANALYSIS

 

FOR 2023 ($ MILLIONS)

        IMPACT ON:  
  

CHANGE

   REVENUE      ANE      CASH FLOW  

Uranium spot and term price1

   $5(US)/lb increase      8        2        (18
   $5(US)/lb decrease      (11      (4      15  

Value of Canadian dollar vs US dollar

   One cent decrease in CAD      5        8         
   One cent increase in CAD      (5      (8       

 

1

Assuming change in both UxC spot price ($70.00 (US) per pound on September 25, 2023) and the UxC long-term price indicator ($61.00 (US) per pound on September 25, 2023)

We have sensitivity to the uranium price through both our sales and purchase commitments. However, for the remainder of the year our sales commitments are less sensitive to an increase in the uranium price than a decrease, while our purchase commitments are equally sensitive to an increase or decrease.

PRICE SENSITIVITY ANALYSIS: URANIUM SEGMENT

As discussed under Long-term contracting on page 26 of our 2022 annual MD&A, our average realized price is based on pricing terms established in our portfolio of long-term contracts, which includes a mix of base-escalated and market-related contracts that are layered in over time. Each confidential contract is bilaterally negotiated with the customer and delivery generally does not begin until two years or more after signing.

 

   

Base-escalated contracts will reflect market conditions and pricing at the time each contract was finalized, with escalation factors applied based on when the material is delivered.

 

   

Market-related contracts reference a market price that can be set several months prior to delivery, subject to specific terms unique to each contract, such as floors and ceilings set relative to market pricing at time of negotiation and typically escalated to time of delivery.

As a result of these contracting dynamics, changes to our average realized price will generally lag changes in market prices in both rising and falling price conditions. The magnitude and direction of the deviation can vary based on the degree of market price volatility between the time the contract price is set, and the time the product is delivered.

To help understand how the pricing under our current portfolio of commitments is expected to react at various spot prices at September 30, 2023, we have constructed the table that follows.

 

2023 THIRD QUARTER REPORT    19


The table is based on the volumes and pricing terms under the long-term commitments in our contract portfolio that have been finalized as at September 30, 2023. The table does not include volumes and pricing terms in contracts under negotiation or those that have been accepted but are still subject to contract finalization. Based on the terms and volumes under contracts that have been finalized, the table is designed to indicate how our average realized price would react under various spot price assumptions at a point in time. In other words, the prices shown in the table would only be realized if the contract portfolio remained exactly as it was on September 30, 2023, using the following assumptions:

 

   

The uranium price remains fixed at a given spot level for each annual period shown

 

   

Deliveries based on commitments under finalized contracts include best estimates of the expected deliveries and flexibility under contract terms

 

   

To reflect escalation mechanisms contained in existing contracts, the long-term US inflation rate target of 2% is used, for modeling purposes only

It is important to note that the table is not a forecast of prices we expect to receive. The prices we actually realize will be different from the prices shown in the table. We intend to update this table each quarter in our MD&A to reflect deliveries made and changes to our contract portfolio. As a result, we expect the table to change from quarter to quarter.

Expected realized uranium price sensitivity under various spot price assumptions at September 30, 2023

(rounded to the nearest $1.00)

 

                                                                                          

SPOT PRICES

($US/lb U3O8)

   $20      $40      $60      $80      $100      $120      $140  

2023

     46        47        48        49        49        49        50  

2024

     35        41        51        56        58        59        60  

2025

     37        43        54        61        64        65        66  

2026

     40        43        56        65        68        69        70  

2027

     41        44        56        67        71        72        73  

As of September 30, 2023, we had commitments requiring delivery of an average of about 29 million pounds per year from 2023 through 2027, with commitment levels in 2023 through 2025 higher than the average and in 2026 and 2027 lower than the average. As the market improves, we expect to continue to layer in volumes capturing greater upside using market-related pricing mechanisms.

Liquidity and capital resources

Our financial objective is to ensure we have the cash and debt capacity to fund our operating activities, investments and other financial obligations in order to execute our strategy and to allow us to self-manage risk. We have a number of alternatives to fund future capital requirements, including using our operating cash flow, drawing on our existing credit facilities, entering new credit facilities, and raising additional capital through debt or equity financings. We are always considering our financing options so we can take advantage of favourable market conditions when they arise. In addition, due to the deliberate cost reduction measures we have implemented, we have continued to have positive cash from operations, which has added to our cash balance. With the net proceeds from the October 2022 share issuance, which are expected to help finance the pending acquisition of Westinghouse, we had significant cash balances again at the end of the third quarter.

As of September 30, 2023, we had cash and cash equivalents of $2.7 billion, while our total debt amounted to $1.0 billion. Our cash balances and investments are held in government securities or with banks that are party to our lending facilities. We have a risk management policy that we follow to manage our exposure to banking counterparties, which limits amount and tenor of cash or investments based on counterparty credit rating. Our investment decisions prioritize security and liquidity and consider concentration amongst our banking partners. The majority of our cash balances are with Schedule I Canadian banks. On October 5, 2023, we received $12 million from CRA for disbursements related to the September 2018 Tax Court decision and cost award.

 

20    CAMECO CORPORATION


As announced on October 11, 2022, we have entered into a strategic partnership with Brookfield and its publicly listed affiliate Brookfield Renewable Partners (Brookfield) and its institutional partners to acquire Westinghouse. Permanent financing is expected to be a mix of capital sources (cash, debt and equity), designed to preserve the company’s balance sheet and ratings strength while maintaining our liquidity. Please see Liquidity and capital resources starting on page 50 of our annual MD&A for more information.

We expect our cash balances, operating cash flows, and the credit facilities put in place to support the close of the Westinghouse transaction, to meet our 2023 capital requirements. Depending on timing, we may have more or less cash than expected at closing and could temporarily draw on our revolving credit facility for short-term working capital purposes.

We have large, creditworthy customers that continue to need our nuclear fuel products and services even during weak economic conditions, and we expect the contract portfolio we have built will continue to provide a solid revenue stream. In our uranium segment, from 2023 through 2027, we have commitments to deliver an average of about 29 million pounds per year, with commitment levels in 2023 through 2025 higher than the average and in 2026 and 2027, lower than the average.

We expect increased production at McArthur River/Key Lake compared to last year will be positive for cash flow as we are able to source more of our committed sales from lower-cost produced pounds and are no longer required to expense operational readiness costs directly to cost of sales. However, cash flow from operations for 2023 will be dependent on the timing and volume of production from McArthur River/Key Lake and Cigar Lake and the timing, magnitude and source of our purchasing activity.

With the Supreme Court’s dismissal of CRA’s application for leave, the dispute for the 2003 through 2006 tax years is fully and finally resolved in our favour. Furthermore, we are confident the courts would reject any attempt by CRA to utilize the same position and arguments for tax years 2007 through 2014, or its alternate reassessing position for tax years 2014 through 2016 and believe CRA should return the remaining $483 million in cash and letters of credit we have been required to pay or otherwise secure. However, timing of any further payments is uncertain. See Transfer pricing dispute starting on page 15 for more information.

CASH FROM/USED IN OPERATIONS

Cash provided by operations was $232 million higher this quarter than in the third quarter of 2022 due to higher earnings and a decrease in working capital requirements, which required $109 million less in 2023 than in 2022. In addition to the higher earnings and decreased working capital requirements, interest received was $27 million more due to higher cash and investment balances and higher interest rates.

Cash provided by operations was $260 million higher in the first nine months of 2023 than for the same period in 2022 due to higher earnings, the $86 million cash refund from CRA, the higher dividend payment from JV Inkai and higher interest received due to higher cash and investment balances and higher interest rates. These factors were partially offset by an increase in working capital requirements, which required $44 million more in 2023 than in 2022. See note 16 of our interim financial statements for more information.

FINANCING ACTIVITIES

We use debt to provide additional liquidity. We have sufficient borrowing capacity with unsecured lines of credit totalling about $2.8 billion at September 30, 2023, up from $2.7 billion at June 30, 2023 due to a stronger US dollar. At September 30, 2023, we had approximately $1.5 billion outstanding in financial assurances, up from $1.4 billion at June 30, 2023 also due to a stronger US dollar.

We have extended the maturity date of our $1.0 billion unsecured revolving credit facility from October 1, 2026, to October 1, 2027. The credit facility allows us to request increases above $1.0 billion, in increments of no less than $50 million, up to a total of $1.25 billion. At September 30, 2023, we had no short-term debt outstanding on our $1.0 billion unsecured revolving credit facility, unchanged from December 31, 2022.

Long-term contractual obligations

Since December 31, 2022, we have reclassified our Series G debentures to current since they mature on June 24, 2024. There have been no other material changes to our long-term contractual obligations. Please see our 2022 annual MD&A for more information.

 

2023 THIRD QUARTER REPORT    21


Debt covenants

We are bound by certain covenants in our unsecured revolving credit facility. The financially related covenants place restrictions on total debt, including guarantees. As at September 30, 2023, we met these financial covenants and do not expect our operating and investment activities for the remainder of 2023 to be constrained by them.

SHARES AND STOCK OPTIONS OUTSTANDING

At October 27, 2023, we had:

 

 

433,865,437 common shares and one Class B share outstanding

 

 

1,706,604 stock options outstanding, with exercise prices ranging from $11.32 to $16.38

DIVIDEND

Our board of directors declared a 2023 annual dividend of $0.12 per common share, payable on December 15, 2023, to shareholders of record on November 30, 2023.

The decision to declare an annual dividend is reviewed regularly by our board in the context of our cash flow, financial position, strategy and other relevant factors, including appropriate alignment with the cyclical nature of our earnings. In 2022, the board increased the dividend by 50% to reflect the expected improvement in our financial performance as we began the transition to our tier-one run rate. Until such time as we return to our tier-one cost structure, the objective of our capital allocation will be to ensure we have the financial capacity to execute on our strategy, including achieving production at McArthur River/Key Lake in accordance with our plan and closing the pending acquisition of Westinghouse. We will continue to navigate by our investment-grade rating through close management of our balance sheet metrics, maintaining sufficient liquidity to meet our risk-mitigated working cash target and that allows us to pursue other value-adding opportunities.

OFF-BALANCE SHEET ARRANGEMENTS

We had three kinds of off-balance sheet arrangements at September 30, 2023:

 

   

purchase commitments

 

   

financial assurances

 

   

other arrangements

Purchase commitments

We make purchases under long-term contracts where it is beneficial for us to do so and in order to support our long-term contract portfolio. The following table is based on our purchase commitments in our uranium and fuel services segments at September 30, 2023,2 but does not include purchases of our share of Inkai production. These commitments include a mix of fixed-price and market-related contracts. Actual payments will be different as a result of changes to our purchase commitments and, in the case of contracts with market-related pricing, the market prices in effect at the time of delivery. We will update this table as required in our MD&A to reflect material changes to our purchase commitments and changes in the prices used to estimate our commitments under market-related contracts.

 

SEPTEMBER 30 ($ MILLIONS)

   2023      2024 AND
2025
     2026 AND
2027
     2028 AND
BEYOND
     TOTAL  

Purchase commitments1,2

     266        117        158        17        558  

 

1 

Denominated in US dollars and Japanese yen, converted from US dollars to Canadian dollars at the rate of 1.33 and from Japanese yen to Canadian dollars at the rate of $0.01.

2 

These amounts have been adjusted for any additional purchase commitments that we have entered into since September 30, 2023, but does not include deliveries taken under contract since September 30, 2023.

We have commitments of $558 million (Cdn) for the following:

 

   

approximately 9.2 million pounds of U3O8 equivalent from 2023 to 2028

 

   

approximately 0.5 million kgU as UF6 in conversion services from 2023 to 2024

 

   

about 0.5 million Separative Work Units (SWU) of enrichment services to meet existing forward sales commitments under agreements with a non-Western supplier

The suppliers do not have the right to terminate agreements other than pursuant to customary events of default provisions.

 

22    CAMECO CORPORATION


Financial assurances

At September 30, 2023, our financial assurances totaled $1.5 billion, up from $1.4 billion at June 30, 2023, due a stronger US dollar.

Other arrangements

We have arranged for standby product loan facilities with various counterparties. The arrangements allow us to borrow up to 2.2 million kgU of UF6 conversion services and 4.0 million pounds of U3O8 over the period 2020 to 2026 with repayment in kind up to December 31, 2026. Under the loan facilities, standby fees of up to 1% are payable based on the market value of the facilities and interest is payable on the market value of any amounts drawn at rates ranging from 0.5% to 2.0%. At September 30, 2023, we have 1.8 million kgU of UF6 conversion services and 2.1 million pounds of U3O8 drawn on the loans.

BALANCE SHEET

 

($ MILLIONS)

   SEP 30, 2023      DEC 31, 2022      CHANGE  

Cash, cash equivalents and short-term investments

     2,668        2,282        17

Total debt

     998        997        —   

Inventory

     509        665        (23 )% 

Total cash, cash equivalents and short-term investments at September 30, 2023 were $2.7 billion, or 17% higher than at December 31, 2022, due to strong earnings, the receipt of the $86 million refund from CRA, the receipt of $79 million (US) of dividend payments from JV Inkai as well as $95 million of interest received during the first nine months of the year. Net debt at September 30, 2023, was negative $1.7 billion.

Total product inventories are $509 million compared to $665 million at the end of 2022. Inventories decreased due to sales being higher than production and purchases in the first nine months of the year. The average cost for uranium has increased to $45.48 per pound compared to $43.45 per pound at December 31, 2022. As of September 30, 2023, we held an inventory of 7.5 million pounds of U3O8 equivalent (excluding broken ore) (December 31, 2022 - 12.4 million pounds). Inventory varies from quarter to quarter depending on the timing of production, purchases and sales deliveries in the year.

Financial results by segment

Uranium

 

           THREE MONTHS
ENDED SEPTEMBER 30
           NINE MONTHS
ENDED SEPTEMBER 30
        

HIGHLIGHTS

         2023      2022      CHANGE     2023      2022      CHANGE  

Production volume (million lbs)

       3.0        2.0        50     11.9        6.6        80

Sales volume (million lbs)

       7.0        5.3        32     22.2        18.7        19

Average spot price

   ($ US/lb     62.63        49.13        27     55.95        49.77        12

Average long-term price

   ($ US/lb     59.13        51.33        15     55.60        49.11        13

Average realized price

                  
   ($ US/lb     52.57        46.30        14     48.62        45.34        7
   ($ Cdn/lb     70.30        59.65        18     65.40        57.84        13

Average unit cost of sales (including D&A)

   ($ Cdn/lb     50.36        56.08        (10 )%      49.68        52.67        (6 )% 

Revenue ($ millions)

       489        313        56     1,452        1,083        34

Gross profit ($ millions)

       139        19        >100     349        97        >100

Gross profit (%)

       28        6        >100     24        9        >100

THIRD QUARTER

Production during the quarter was 3.0 million pounds, 50% higher than the third quarter of 2022. See Uranium 2023 Q3 updates starting on page 27 for more information.

 

2023 THIRD QUARTER REPORT    23


Uranium revenues this quarter were up 56% compared to 2022 due to a 32% increase in sales volume due to the timing of sales, which were in line with the delivery pattern disclosed in our annual MD&A, and an increase of 18% in the Canadian dollar average realized price. While the US dollar average realized price increased by 14%, the Canadian dollar average realized price increased by 18% as a result of a weakening of the Canadian dollar. For more information on the impact of spot price changes on average realized price, see Price sensitivity analysis: uranium segment on page 19.

Total cost of sales (including D&A) increased by 19% ($351 million compared to $295 million in 2022) due to a 32% increase in sales volume which was partially offset by a unit cost of sales that was 10% lower than the same period last year. Unit cost of sales was lower in 2023 due primarily to a decrease in operational readiness costs at McArthur River and Key Lake operations.

The net effect was a $120 million increase in gross profit for the quarter.

Equity earnings from investee, JV Inkai, were $35 million in the third quarter compared to $9 million in same period last year.

FIRST NINE MONTHS

Production volumes for the first nine months of the year were 80% higher than in the previous year. See Uranium 2023 Q3 updates starting on page 27 for more information.

Uranium revenues increased 34% compared to the first nine months of 2022 due to a 19% increase in sales volumes and an increase of 13% in the Canadian dollar average realized price as a result of the impact of the increase in the average US dollar spot price on market-related contracts as well as the weakening of the Canadian dollar. For more information on the impact of spot price changes on average realized price, see Price sensitivity analysis: uranium segment on page 19.

Total cost of sales (including D&A) increased by 12% ($1.1 billion compared to $986 million in 2022) primarily as a result of a 19% increase in sales volume partially offset by a unit cost of sales that was 6% lower than the same period last year. Unit cost of sales was lower in 2023 due to higher operational readiness costs at McArthur River and Key Lake operations in 2022 slightly offset by the higher cost of purchased material in 2023 compared to the same period in 2022.

The net effect was a $252 million increase in gross profit for the first nine months.

Equity earnings from investee, JV Inkai, were $100 million for the first nine months compared to $78 million for the same period last year.

The table below shows the costs of produced and purchased uranium incurred in the reporting periods (which are non-IFRS measures, see the paragraphs below the table). These costs do not include care and maintenance costs, selling costs such as royalties, transportation and commissions, nor do they reflect the impact of opening inventories on our reported cost of sales.

 

     THREE MONTHS
ENDED SEPTEMBER 30
           NINE MONTHS
ENDED SEPTEMBER 30
        

($CDN/LB)

   2023      2022      CHANGE     2023      2022      CHANGE  

Produced

                

Cash cost

     32.37        22.08        47     25.60        19.10        34

Non-cash cost

     12.24        17.68        (31 )%      11.92        16.82        (29 )% 
  

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

 

Total production cost 1

     44.61        39.76        12     37.52        35.92        4
  

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

 

Quantity produced (million lbs)1

     3.0        2.0        50     11.9        6.6        80
  

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

 

Purchased

                

Cash cost

     79.14        46.25        71     69.88        48.71        43
  

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

 

Quantity purchased (million lbs)1

     0.8        4.6        (83 )%      5.0        12.5        (60 )% 
  

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

 

Totals

                

Produced and purchased costs

     51.88        44.28        17     47.09        44.29        6
  

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

 

Quantities produced and purchased (million lbs)

     3.8        6.6        (42 )%      16.9        19.1        (12 )% 
  

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

 

 

1 

Due to equity accounting, our share of production from JV Inkai is shown as a purchase at the time of delivery. These purchases will fluctuate during the quarters and timing of purchases will not match production. There were no purchases during the quarter. In the first nine months of 2023, we purchased 1.4 million pounds of material produced in 2022 at a purchase price per pound of $66.51 ($48.69 (US)).

 

24    CAMECO CORPORATION


The average cash cost of production was 47% higher for the quarter compared to the same period in 2022. For the first nine months, the average cash cost of production was 34% higher than in the same period in 2022. In 2023, with McArthur River/Key Lake ramping up production, inflationary pressure, the availability of personnel with the necessary skills and experience, and supply chain challenges with the availability of materials and reagents, our annual cash cost of production is expected to be higher than the average life of mine operating costs noted in our most recent annual information form: approximately $16 per pound at McArthur River/Key Lake and approximately $18 per pound at Cigar Lake.

We equity account for our share of JV Inkai. As a result, we record our share of its production as a purchase, which under Kazakhstan’s pricing regulations, requires we purchase the material at a price equal to the uranium spot price, less a 5% discount. However, this does not reflect the economic benefit to Cameco. Our share of the economic benefit is based on the difference between our purchase price and JV Inkai’s lower production cost and is reflected in the line item on our statement of earnings called, “share of earnings from equity-accounted investee.” This benefit is realized through payment of a cash dividend by JV Inkai. Excess cash, net of working capital requirements is distributed to the partners as dividends. If there is a significant disruption to JV Inkai’s operations for any reason, it may not achieve its production plans, there may be a delay in production, and it may experience increased costs to produce uranium.

Although purchased pounds are transacted in US dollars, we account for the purchases in Canadian dollars. In the third quarter, the average cash cost of purchased material was $79.14 (Cdn) per pound, or $59.26 (US) per pound, compared to $46.25 (Cdn) per pound, or $35.99 (US) per pound in the third quarter of 2022. For the first nine months, the average cash cost of purchased material was $69.88 (Cdn), or $51.58 (US) per pound, compared to $48.71 (Cdn), or $38.18 (US) per pound in the same period in 2022. As a result, the average cash cost of purchased material in Canadian dollar terms increased by 71% this quarter and increased by 43% for the nine months compared to the same periods last year.

Cash cost per pound, non-cash cost per pound and total cost per pound for produced and purchased uranium presented in the above table are non-IFRS measures. These measures do not have a standardized meaning or a consistent basis of calculation under IFRS. We use these measures in our assessment of the performance of our uranium business. We believe that, in addition to conventional measures prepared in accordance with IFRS, certain investors use this information to evaluate our performance and ability to generate cash flow.

These measures are non-standard supplemental information and should not be considered in isolation or as a substitute for measures of performance prepared according to accounting standards. These measures are not necessarily indicative of operating profit or cash flow from operations as determined under IFRS. Other companies may calculate these measures differently, so you may not be able to make a direct comparison to similar measures presented by other companies.

To facilitate a better understanding of these measures, the following table presents a reconciliation of these measures to our unit cost of sales for the third quarter and the first nine months of 2023 and 2022.

 

2023 THIRD QUARTER REPORT    25


Cash and total cost per pound reconciliation

 

     THREE MONTHS
ENDED SEPTEMBER 30
     NINE MONTHS
ENDED SEPTEMBER 30
 

($ MILLIONS)

   2023      2022      2023     2022  

Cost of product sold

     304.6        257.7        959.1       868.5  

Add / (subtract)

          

Royalties

     (22.3      (6.5      (61.0     (21.4

Care and maintenance and operational readiness costs

     (12.1      (53.7      (35.2     (143.0

Other selling costs

     (3.0      (0.5      (7.1     (3.9

Change in inventories

     (106.8      59.9        (201.8     34.7  
  

 

 

    

 

 

    

 

 

   

 

 

 

Cash operating costs (a)

     160.4        256.9        654.0       734.9  

Add / (subtract)

          

Depreciation and amortization

     46.0        36.9        143.9       117.6  

Care and maintenance and operational readiness costs

     (0.8      (10.0      (3.4     (32.4

Change in inventories

     (8.5      8.5        1.3       25.8  
  

 

 

    

 

 

    

 

 

   

 

 

 

Total operating costs (b)

     197.1        292.3        795.8       845.9  
  

 

 

    

 

 

    

 

 

   

 

 

 

Uranium produced & purchased (million lbs) (c)

     3.8        6.6        16.9       19.1  
  

 

 

    

 

 

    

 

 

   

 

 

 

Cash costs per pound (a ÷ c)

     42.21        38.92        38.70       38.48  

Total costs per pound (b ÷ c)

     51.88        44.28        47.09       44.29  
  

 

 

    

 

 

    

 

 

   

 

 

 

Fuel services

(includes results for UF6, UO2, UO3 and fuel fabrication)

 

           THREE MONTHS
ENDED SEPTEMBER 30
           NINE MONTHS ENDED
SEPTEMBER 30
        

HIGHLIGHTS

         2023      2022      CHANGE     2023      2022      CHANGE  

Production volume (million kgU)

       2.0        1.5        33     9.6        9.3        3

Sales volume (million kgU)

       2.1        2.3        (9 )%      7.8        7.3        7

Average realized price

   ($ Cdn/kgU     39.87        33.43        19     37.44        34.39        9

Average unit cost of sales (including D&A)

   ($ Cdn/kgU     33.00        29.43        12     26.59        23.99        11

Revenue ($ millions)

       86        75        15     291        250        16

Gross profit ($ millions)

       15        9        67     84        76        11

Gross profit (%)

       17        12        42     29        30        (3 )% 

THIRD QUARTER

Total revenue for the third quarter of 2023 increased by 15% from $75 million in the same period last year to $86 million. This was due primarily to a 19% increase in average realized price compared to 2022 partially offset by a 9% decrease in sales volumes. Average realized price increased mainly due to increased prices for UF6 due to market conditions.

The total cost of products and services sold (including D&A) increased 8% ($71 million compared to $66 million in 2022) due to an increase of 12% in the average unit cost of sales which was partially offset by the 9% decrease in sales volume. Unit cost of sales increased mainly as a result of higher input costs.

The net effect was a $6 million increase in gross profit.

 

26    CAMECO CORPORATION


FIRST NINE MONTHS

In the first nine months of the year, total revenue increased 16% to $291 million from $250 million for the same period last year due to a 7% increase in sales volumes and a 9% increase in realized price. The increase in average realized price was mainly the result of increased prices due to market conditions.

The total cost of products and services sold (including D&A) increased 19% ($207 million compared to $174 million in 2022) due to the 7% increase in sales volume and an 11% increase in the average unit cost of sales due to higher input costs.

The net effect was an $8 million increase in gross profit.

Our operations

Uranium – production overview

Production volumes reflect our increased ownership interest in Cigar Lake of 54.547% as of May 19, 2022 (previously 50.025%).

We had 3.0 million pounds of production (our share) in the third quarter and 11.9 million pounds production (our share) in the first nine months of 2023, compared to 2.0 million pounds and 6.6 million pounds in the same periods of 2022. In 2022, there was no production from McArthur River and Key Lake until the fourth quarter.

We continue to evaluate the optimal mix of production, inventory and purchases in order to retain the flexibility to deliver long-term value.

URANIUM PRODUCTION

 

     THREE MONTHS
ENDED SEPTEMBER 30
           NINE MONTHS
ENDED SEPTEMBER 30
              

OUR SHARE (MILLION LBS)

   2023      2022      CHANGE     2023      2022      CHANGE     2023 PLAN  

Cigar Lake

     1.4        2.0        (30 )%      5.6        6.6        (15 )%      8.9 1 

McArthur River/Key Lake

     1.6        —               6.3        —               9.8 2 
  

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

   

 

 

 

Total

     3.0        2.0        50     11.9        6.6        80     18.7  
  

 

 

    

 

 

    

 

 

   

 

 

    

 

 

    

 

 

   

 

 

 

 

1 

During the third quarter, we updated our Cigar Lake production forecast to up to 16.3 million pounds (100% basis) in 2023 (previously 18 million pounds).

2 

During the third quarter, we updated our McArthur River/Key Lake production forecast to 14 million pounds (100% basis) in 2023 (previously 15 million pounds).

Inflation, the availability of personnel with the necessary skills and experience, aging infrastructure, and the impact of supply chain challenges on the availability of materials and reagents carry with them the risk that we do not achieve our production plans and/or, experience production delays and increased costs. Additionally, with the extended period of time the McArthur River/Key Lake assets were on care and maintenance, the operational changes that have been made, and commissioning issues that we worked through at the mill in 2022, there is continued uncertainty regarding the timing of a successful ramp up to planned production and the associated costs.

Uranium 2023 Q3 updates

PRODUCTION UPDATE

McArthur River/Key Lake

The McArthur River and Key Lake operation was in a state of safe care and maintenance from 2018 through 2021 due to weak market conditions. The operation began transitioning back to production through the first three quarters of 2022, with no packaged pounds until the fourth quarter. Production ramp-up activities continue in 2023.

In the third quarter of 2023, total packaged production from McArthur River and Key Lake was 2.3 million pounds (1.6 million pounds our share). Our share of production in the first nine months of 2023 was 6.3 million pounds.

 

2023 THIRD QUARTER REPORT    27


As announced on September 3, 2023, we now expect packaged production of 14 million pounds (9.8 million pounds our share) in 2023 (previously 15 million pounds or 10.5 million pounds our share). Challenges at the Key Lake mill related to length of time the facility was in care and maintenance, the operational changes that were implemented throughout the mill, availability of personnel with the necessary skills and experience, and the impact of supply chain challenges on the availability of materials and reagents have resulted in lower expected production for 2023. The McArthur River mine continues to operate well and is expected to achieve its planned mine production for the year. Any ore from McArthur River that is not immediately processed at Key Lake will be stored in inventory for future milling.

We continue to expect production of 18 million pounds (12.6 million pounds our share) in 2024.

The collective agreement with the United Steelworkers Local 8914 expired in December 2022, and we are in negotiations to reach a new agreement. As in the past, work continues under the terms of the expired collective agreement while negotiations proceed. There is a risk to the production plan if we are unable to reach an agreement and there is a labour disruption.

In October 2023, the Canadian Nuclear Safety Commission (CNSC) granted 20-year renewals to the licences for both McArthur River and Key Lake. The renewed licences are expected to allow McArthur River and Key Lake to operate until October 2043.

Cigar Lake

Total packaged production from Cigar Lake was 2.6 million pounds (1.4 million pounds our share) in the third quarter of 2023 compared to 3.6 million pounds (2.0 million pounds our share) in the third quarter of 2022. Our share of production in the first nine months of 2023 was 5.6 million pounds compared to 6.6 million pounds in the first nine months of 2022.

As announced on September 3, 2023, we now expect production of up to 16.3 million pounds (up to 8.9 million pounds our share) at Cigar Lake in 2023 (previously 18.0 million pounds or 9.8 million pounds our share). In our second quarter MD&A we noted that productivity had been impacted as we completed development and commissioning activities and achieved first production from a new mining area. We had expected to recover from these delays in the second half of the year. However, in the third quarter, we determined maintenance work was required on one of the underground circuits, which had not been planned. The additional time required to complete this work does not allow for the delayed production volumes to be recovered prior to year-end.

The 2023 annual planned maintenance shutdown, including the unplanned work, was completed by the end of September. All objectives of the maintenance shutdown were achieved, and normal production activities have resumed.

We continue to expect 18.0 million pounds (9.8 million pounds our share) in 2024.

Inkai

Production on a 100% basis was 2.0 million pounds for the quarter and 6.3 million pounds for the first nine months of the year, compared to 2.3 million pounds and 5.8 million pounds in the same periods last year.

Based on an adjustment to the production purchase entitlement under the 2016 JV Inkai restructuring agreement, we are entitled to purchase 4.2 million pounds, or 50% of JV Inkai’s planned 2023 production of 8.3 million pounds.

Due to equity accounting, our share of production is shown as a purchase at a discount to the spot price and included in inventory at this value at the time of delivery. Our share of the profits earned by JV Inkai on the sale of its production to the JV partners is included in “share of earnings from equity-accounted investee” on our consolidated statement of earnings. Excess cash, net of working capital requirements is distributed to the partners as dividends.

Achievement of JV Inkai’s 2023 production forecast requires it to continue to successfully manage several ongoing risks, including the potential impact of procurement and supply chain issues, and inflationary pressures on its production materials and reagents. If there is a significant disruption to JV Inkai’s operations for any reason, it may not achieve its production plans, there may be a delay in production, and it may experience increased costs to produce uranium.

 

28    CAMECO CORPORATION


The geopolitical situation continues to cause transportation risks in the region. The first shipment containing approximately two thirds of our share of Inkai’s 2023 production is currently in transit. We expect the shipment to arrive before the end of 2023. The second shipment with remaining volume of our share of 2023 production is expected to depart before the end of the year and arrive in early 2024. We continue to work closely with JV Inkai and our joint venture partner, Kazatomprom, to receive our share of production via the Trans-Caspian International Transport Route, which does not rely on Russian rail lines or ports. We could experience further delays to our expected Inkai deliveries this year if transportation using this shipping route takes longer than anticipated. To mitigate the risk of delays, we have inventory, long-term purchase agreements and loan arrangements in place we can draw on. Depending on when we receive shipments of our share of Inkai’s production, our share of earnings from this equity-accounted investee and the timing of the receipt of our share of dividends from the joint venture may be impacted.

TIER-TWO CURTAILED OPERATIONS

US ISR Operations

As a result of our 2016 curtailment decision, commercial production has ceased. As production is suspended, we expect ongoing cash and non-cash care and maintenance costs to range between $14 million (US) and $16 million (US) for 2023.

Rabbit Lake

Rabbit Lake remains in a safe state of care and maintenance following the suspension of production in 2016. We continue to evaluate opportunities to minimize care and maintenance costs and expect these costs to range between $27 million and $32 million for 2023.

In October 2023, the CNSC granted a 15-year renewal to the licence for Rabbit Lake. The renewed licence is expected to allow Rabbit Lake to operate until October 2038 once it has resumed operations.

Fuel services 2023 Q3 updates

PORT HOPE CONVERSION SERVICES

CAMECO FUEL MANUFACTURING INC. (CFM)

Production update

Fuel services produced 2.0 million kgU in the third quarter of 2023, 33% higher than the third quarter last year, and 9.6 million kgU in the first nine months, which was 3% higher than the same period last year.

In our fuel services segment, which includes the production of UO2, UF6 and heavy water reactor fuel bundles, we expect to produce between 13 million and 14 million kgU of combined fuel services products in 2023 (outlook and production results are not disclosed by individual product line).

In addition, at our Port Hope UF6 conversion facility we are working on increasing annual production to 12,000 tonnes in 2024 to satisfy our book of long-term commitments and demand for conversion services.

 

2023 THIRD QUARTER REPORT    29


Pending acquisition of Westinghouse

As announced on October 11, 2022, we entered into a strategic partnership with Brookfield and its publicly listed affiliate Brookfield Renewable Partners (Brookfield) and its institutional partners to acquire Westinghouse, a global provider of mission-critical and specialized technologies, products and services across most phases of the nuclear power sector. Brookfield, with its institutional partners, will beneficially own a 51% interest in Westinghouse and Cameco will beneficially own 49%. Bringing together Cameco’s expertise in the nuclear industry with Brookfield’s expertise in clean energy positions nuclear power at the heart of the energy transition and creates a powerful platform for strategic growth across the nuclear sector.

We continue to work on closing the acquisition by the end of 2023. Closing is subject to the receipt of the remaining required approvals and other closing conditions. The final financing, our share of which will be approximately $2.2 billion (US), will be determined based on our cash balance, cash flow generation, and market conditions at the time of close. We expect a permanent financing mix of capital sources, including cash, debt and equity, designed to preserve our balance sheet and ratings strength, while maintaining healthy liquidity. See our 2022 annual MD&A for more information.

 

 

Caution about forward-looking information relating to the Westinghouse acquisition

This discussion of our expectations for the Westinghouse acquisition, including sources and uses of financing for the acquisition, timeline for the acquisition, including anticipated closing date, is forward-looking information that is based upon the assumptions and subject to the material risks discussed under the headings Caution about forward-looking information beginning on page 2, and in our October 18, 2022, material change report. The material change report is available at www.sedarplus.ca and www.sec.gov. Actual results and events may be significantly different from what we currently expect.

Qualified persons

The technical and scientific information discussed in this document for our material properties (McArthur River/Key Lake, Inkai and Cigar Lake) was approved by the following individuals who are qualified persons for the purposes of NI 43-101:

 

MCARTHUR RIVER/KEY LAKE

 

  Greg Murdock, general manager, McArthur River, Cameco

 

  Daley McIntyre, general manager, Key Lake, Cameco

CIGAR LAKE

 

  Lloyd Rowson, general manager, Cigar Lake, Cameco

INKAI

 

  Sergey Ivanov, deputy general director, technical services, Cameco Kazakhstan LLP
 

 

30    CAMECO CORPORATION


Additional information

Critical accounting estimates

Due to the nature of our business, we are required to make estimates that affect the amount of assets and liabilities, revenues and expenses, commitments and contingencies we report. We base our estimates on our experience, our best judgment, guidelines established by the Canadian Institute of Mining, Metallurgy and Petroleum and on assumptions we believe are reasonable.

Purchase prices related to business combinations and asset acquisitions are allocated to the underlying acquired assets and liabilities based on their estimated fair value at the time of acquisition. The determination of fair value requires us to make assumptions, estimates and judgments regarding future events. The allocation process is inherently subjective and impacts the amounts assigned to individually identifiable assets and liabilities. As a result, the purchase price allocation impacts our reported assets and liabilities, future net earnings due to the impact on future depreciation and amortization expense and impairment tests.

Controls and procedures

As of September 30, 2023, we carried out an evaluation under the supervision and with the participation of our management, including our chief executive officer (CEO) and chief financial officer (CFO), of the effectiveness of our disclosure controls and procedures. There are inherent limitations to the effectiveness of any system of disclosure controls and procedures, including the possibility of human error and the circumvention or overriding of the controls and procedures. Accordingly, even effective disclosure controls and procedures can only provide reasonable assurance of achieving their control objectives.

Based upon that evaluation and as of September 30, 2023, the CEO and CFO concluded that:

 

 

the disclosure controls and procedures were effective to provide reasonable assurance that information required to be disclosed in the reports we file and submit under applicable securities laws is recorded, processed, summarized and reported as and when required

 

 

such information is accumulated and communicated to our management, including our CEO and CFO, as appropriate to allow timely decisions regarding required disclosure

There have been no changes in our internal control over financial reporting during the quarter ended September 30, 2023, that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.

 