XML 76 R10.htm IDEA: XBRL DOCUMENT v3.20.4
Rate And Regulatory Matters
12 Months Ended
Dec. 31, 2020
Public Utilities, General Disclosures [Abstract]  
RATE AND REGULATORY MATTERS RATE AND REGULATORY MATTERS
Below is a summary of our regulatory frameworks and significant regulatory proceedings and related lawsuits. We are unable to predict the ultimate outcome of these matters, the timing of final decisions of the various agencies and courts, or the effect on our results of operations, financial position, or liquidity.
Regulatory Frameworks
Missouri
The MoPSC regulates rates and other matters for Ameren Missouri’s electric service and natural gas distribution businesses. The rates Ameren Missouri charges customers for these services are established in a traditional regulatory rate review, which takes up to 11 months to complete, based on a historical test year and the allowed ROE established in the review.
Ameren Missouri has recovery mechanisms, including the RESRAM, FAC, MEEIA, PGA, DCA, and ISRS, that allow customer rates to be adjusted without a traditional regulatory rate review. These riders, along with the PISA, each described in more detail below, partially mitigate the effects of regulatory lag. Ameren Missouri also employs other recovery mechanisms, including a pension and postretirement benefit cost tracker, an uncertain income tax position tracker, a tracker on certain excess deferred income taxes, a renewable energy standard cost tracker, and a solar rebate program cost tracker. Each of these trackers allows Ameren Missouri to defer the difference between actual costs incurred and costs included in customer rates as a regulatory asset or regulatory liability. The difference will be reflected in base rates in a subsequent MoPSC rate order. Ameren Missouri’s cost recovery under any of its recovery mechanisms is subject to MoPSC prudence reviews.
The PISA permits Ameren Missouri to defer and recover 85% of the depreciation expense and earn a return at the applicable WACC on investments in certain property, plant, and equipment placed in service after September 1, 2018, and not included in base rates. The regulatory asset for accumulated PISA deferrals also earns a return at the applicable WACC, with all approved PISA deferrals added to rate
base prospectively and recovered over a period of 20 years following a regulatory rate review. Additionally, under the RESRAM, Ameren Missouri is permitted to recover the 15% of depreciation expense not recovered under the PISA, and earn a return at the applicable WACC for investments in renewable generation plant placed in service. The deferrals are a regulatory asset until they are included in customer rates and collected in a subsequent period. Those investments not eligible for recovery under the PISA and the remaining 15% of certain property, plant, and equipment placed in service, unless eligible for recovery under the RESRAM, remain subject to regulatory lag. Ameren Missouri recognizes the cost of debt on PISA deferrals in revenue, instead of using the applicable WACC, with the difference recognized in revenues when recovery of such deferrals is reflected in customer rates. Under Missouri law, as a result of the PISA election, additional provisions apply to Ameren Missouri, including limitations on electric customer rate increases. If rate changes from the FAC or the RESRAM riders would cause rates to temporarily exceed the 2.85% rate cap, the overage would be deferred for future recovery in the next regulatory rate review; however, rates established in such regulatory rate review would be subject to the rate cap. Any deferred overages approved for recovery would be recovered in a manner consistent with costs recovered under the PISA. Excluding customer rates under the MEEIA rider, which are not subject to the rate cap, Ameren Missouri would incur a penalty equal to the amount of deferred overage that would cause customer rates to exceed the 2.85% rate cap. Ameren Missouri did not incur a penalty related to the rate cap in 2020. Both the rate increase limitation and the PISA are effective through December 2023. Missouri law provides for the ability to use the PISA, if Ameren Missouri requests and receives MoPSC approval for extension, through December 2028.
The RESRAM permits Ameren Missouri to recover or refund, through customer rates, the difference between the cost of compliance with Missouri’s renewable energy standard and the amount set in base rates. Customer rates are adjusted for the RESRAM on an annual basis without a traditional regulatory rate review, subject to MoPSC prudence reviews. The difference between actual compliance costs and costs billed to customers in a given period is deferred as a regulatory asset or liability. The deferred amount is either billed or refunded to customers in a subsequent period. RESRAM regulatory assets earn carrying costs at short-term interest rates. The RESRAM permits Ameren Missouri to recover investments in wind generation and other renewables related to compliance with Missouri’s renewable energy standard, and earn a return at the applicable WACC on those investments not already provided for in customer rates or any other recovery mechanism.
The FAC permits Ameren Missouri to recover or refund, through customer rates, 95% of the variance in net energy costs from the amount set in base rates without a traditional regulatory rate review, subject to MoPSC prudence reviews, with the remaining 5% of changes retained by Ameren Missouri. Net recovery of these costs through customer rates does not affect Ameren Missouri’s electric margins, as any change in revenue is offset by a corresponding change in fuel expense. The difference between actual net energy costs and costs billed to customers in a given period is deferred as a regulatory asset or liability. The deferred amount is either billed or refunded to customers in a subsequent period. FAC regulatory assets earn carrying costs at short-term interest rates. Ameren Missouri’s base rates for electric service are required to be reset at least every four years to allow for continued use of the FAC.
The MEEIA permits Ameren Missouri to recover customer energy-efficiency program costs, the related lost electric margins, and any performance incentive through the MEEIA without a traditional regulatory rate review. MEEIA assets earn carrying costs at short-term interest rates.
Ameren Missouri is a member of the MISO, and its transmission rate is calculated in accordance with the MISO Open Access Transmission, Energy, and Operating Reserve Markets Tariff. The FERC regulates the rates charged and the terms and conditions for wholesale electric transmission service. The transmission rate update each June is based on Ameren Missouri’s actual historical cost from the prior calendar year. This rate is not directly charged to Missouri retail customers because, in Missouri, bundled retail rates include an amount for transmission-related costs and revenues.
The PGA allows Ameren Missouri to recover prudently incurred costs of natural gas purchased on behalf of its customers without a traditional regulatory rate review. These pass-through purchased gas costs do not affect Ameren Missouri’s natural gas margins, as any change in costs is offset by a corresponding change in revenues. The difference between actual natural gas costs and costs billed to customers in a given period is deferred as a regulatory asset or liability. The deferred amount is either billed or refunded to customers in a subsequent period. PGA regulatory assets earn carrying costs at short-term interest rates. The DCA ensures recoverability of the natural gas delivery service revenue requirement that is dependent on sales volumes for nearly all customers. The DCA allows Ameren Missouri to adjust natural gas delivery service rates without a traditional regulatory rate review when changes occur in sales volumes from those volumes approved by the MoPSC in the previous regulatory rate review. The difference between actual gas delivery service revenues billed to customers and revenues approved by the MoPSC in a given period is deferred as a regulatory asset or liability. DCA regulatory assets earn carrying costs at short-term interest rates. The deferred amount is either billed or refunded to customers in a subsequent period. In addition, the ISRS permits certain prudently incurred natural gas infrastructure replacement costs to be recovered from customers on a more timely basis between regulatory rate reviews. The ROE currently used by Ameren Missouri for purposes of the ISRS tariff is 9.725%.
Illinois
The ICC regulates rates and other matters for Ameren Illinois’ electric distribution service and natural gas distribution businesses. The
rates Ameren Illinois charges customers for electric distribution service are calculated under a performance-based formula ratemaking framework. The rates Ameren Illinois charges customers for natural gas distribution service are established in a traditional regulatory rate review, which takes up to 11 months to complete, based on a future test year and an allowed ROE established in the review.
Ameren Illinois’ election to use the electric distribution service performance-based formula ratemaking framework allowed by state law, described below, permits Ameren Illinois to adjust customer rates to recover the cost of electric distribution service on an annual basis. Ameren Illinois’ electric distribution service also has other cost recovery mechanisms in place that allow customer rates to be adjusted without a traditional regulatory rate review. Ameren Illinois’ electric distribution service business has riders for power procurement and transmission services incurred on behalf of its customers, renewable energy credit compliance, zero emission credits, and certain environmental costs, as well as bad debt write-offs and the costs of certain asbestos-related claims not recovered in base rates. These pass-through costs do not affect Ameren Illinois’ net income, as any change in costs is offset by a corresponding change in revenues. Ameren Illinois’ cost recovery under any of its recovery mechanisms is subject to ICC prudence reviews.
Ameren Illinois’ electric distribution service performance-based formula ratemaking framework allows Ameren Illinois to reconcile electric distribution service rates to its actual revenue requirement on an annual basis. If a given year’s revenue requirement varies from the amount collected from customers, an adjustment is made to electric operating revenues with an offset to a regulatory asset or liability to reflect that year’s actual revenue requirement, independent of actual sales volumes. The regulatory balance is then collected from, or refunded to, customers within two years from the end of the year. In addition, Ameren Illinois’ electric customer energy-efficiency rider provides Ameren Illinois’ electric distribution service business with recovery of, and return on, energy-efficiency investments. Under formula ratemaking for both its electric distribution service and its electric energy-efficiency investments, the revenue requirements are based on recoverable costs, year-end rate base, and a year-end ratemaking capital structure, and earn a return at the applicable WACC. The ROE component of the applicable WACC is based on the annual average of the monthly yields of the 30-year United States Treasury bonds plus 580 basis points and any performance-related basis point adjustments, described in more detail below. Therefore, Ameren Illinois’ annual ROE for its electric distribution business is directly correlated to the yields on such bonds. In addition, regulatory assets applicable to formula ratemaking for both electric distribution service and electric energy-efficiency investments earn a return at the applicable WACC. However, Ameren Illinois recognizes the cost of debt on these regulatory assets in revenue, instead of the applicable WACC, with the difference recognized in revenues when recovery of such regulatory assets is reflected in customer rates.
Unless extended, the performance-based formula ratemaking framework expires at the end of 2022. If not extended, Ameren Illinois would be required to establish future rates through a traditional regulatory rate review, which would allow the use of a future test year, with the ICC. The decoupling provisions extend beyond the end of the formula ratemaking by law, which ensures that Ameren Illinois’ electric distribution revenues authorized in a regulatory rate review are not affected by changes in sales volumes. See below for information regarding a request filed by Ameren Illinois to continue reconciling electric distribution service rates to the last annual revenue requirement approved by the ICC under the formula ratemaking framework after the framework expires or is no longer elected.
Ameren Illinois electric distribution service business is also subject to performance standards. Failure to achieve the standards would result in a reduction in the company’s allowed ROE calculated under the formulas. The performance standards applicable to electric distribution service include improvements in service reliability to reduce both the frequency and duration of outages, a reduction in the number of estimated bills, a reduction of consumption from inactive meters, and a reduction in bad debt expense. The electric distribution service regulatory framework provides for ROE penalties up to 38 basis points annually in 2021 and 2022 if these performance standards are not met. The allowed ROE on energy-efficiency investments can be increased or decreased up to 200 basis points, depending on the achievement of annual energy savings goals. Any adjustments to the allowed ROE for energy-efficiency investments will depend on annual performance for a historical period relative to energy savings goals. In 2020, 2019, and 2018, there were no performance-related basis point adjustments that materially affected financial results.
Ameren Illinois’ natural gas distribution business has recovery mechanisms, including the QIP, PGA, and VBA, that allow customer rates to be adjusted without a traditional regulatory rate review. These riders, described in more detail below, mitigate the effects of regulatory lag. Ameren Illinois employs other riders for natural gas customer energy-efficiency program costs and certain environmental costs, as well as bad debt expenses and invested capital taxes not recovered in base rates. Pass-through costs under the riders do not affect Ameren Illinois’ net income, as any change in costs is offset by a corresponding change in revenues. Ameren Illinois’ cost recovery under any of its recovery mechanisms is subject to ICC prudence reviews.
The QIP provides Ameren Illinois with recovery of, and a return on, qualifying natural gas infrastructure investments that are placed in service between regulatory rate reviews. Infrastructure investments under the QIP earn a return at the applicable WACC. Eligible natural gas investments include projects to improve safety and reliability and modernization investments, such as smart meters. The deferrals are a regulatory asset until they are included in customer rates in a subsequent period. Recovery of the regulatory asset begins two months after the qualifying natural gas plant is placed in service and continues until such plant is included in base rates in a natural gas delivery service rate order. Ameren Illinois’ QIP is subject to a rate impact limitation of a cumulative 4% per year since the most recent delivery service rate order, with no single year exceeding 5.5%. If the rate impact limitation was met in a particular year, the amount of rate base causing the QIP
rate to exceed the limitation would be exposed to regulatory lag until a year when that amount could be recovered under QIP or is added to rate base as a part of a regulatory rate review. Upon issuance of a natural gas delivery service rate order, QIP rate base is transferred to base rates and the QIP is reset to zero, which mitigates the risk that the QIP will exceed its statutory limitations in future years and ensures timely recovery of capital investments. Without legislative action, the QIP will sunset after December 2023.
The PGA allows Ameren Illinois to recover prudently incurred costs of natural gas purchased on behalf of its customers without a traditional regulatory rate review. These pass-through purchased gas costs do not affect Ameren Illinois natural gas margins, as any change in costs is offset by a corresponding change in revenues. The difference between actual natural gas costs and costs billed to customers in a given period is deferred as a regulatory asset or liability. The deferred amount is either billed or refunded to customers in a subsequent period. PGA regulatory assets earn carrying costs at short-term interest rates. The VBA ensures recoverability of the natural gas distribution service revenue requirement that is dependent on sales volumes for residential and small nonresidential customers. For these rate classes, the VBA allows Ameren Illinois to adjust natural gas distribution service rates without a traditional regulatory rate review when changes occur in sales volumes from those volumes approved by the ICC in a previous regulatory rate review. The difference between allowed sales revenues and amounts billed to customers in a given period is deferred as a regulatory asset or liability. The deferred amount is collected from, or refunded to, customers in a subsequent period. VBA regulatory assets for a given year that are not fully collected by the end of the following year begin earning carrying costs at short-term interest rates.
Federal
The FERC regulates rates and other matters for Ameren Illinois’ transmission business and ATXI, as well as for Ameren Missouri. See discussion above related to Ameren Missouri. Both Ameren Illinois and ATXI are members of the MISO, and their transmission rates are calculated in accordance with the MISO Open Access Transmission, Energy, and Operating Reserve Markets Tariff. Ameren Illinois and ATXI have received FERC approval to use a company-specific, forward-looking formula ratemaking framework in setting their transmission rates. These forward-looking rates are updated annually and become effective each January with forecasted information. The formula rate framework provides for an annual reconciliation of the electric transmission service revenue requirement, which reflects the actual recoverable costs incurred and the 13-month average rate base for a given year, with the revenue requirement in customer rates, including an allowed ROE. If a given year’s revenue requirement varies from the amount collected from customers, an adjustment is made to electric operating revenues with an offset to a regulatory asset or liability to reflect that year’s actual revenue requirement, independent of actual sales volumes. The regulatory balance is collected from, or refunded to, customers within two years from the end of the year. FERC revenue requirement reconciliation adjustment regulatory assets earn carrying costs at each company’s short-term interest rates, while each company incurs interest at a FERC-prescribed rate on related regulatory liabilities. In addition, the FERC has approved transmission rate incentives, including a 50 basis point incentive adder to the allowed base ROE for Ameren Illinois and ATXI for participation in an RTO.
Proceedings and Updates
Missouri
March 2020 MoPSC Electric Rate Order
In March 2020, the MoPSC issued an order in Ameren Missouri’s July 2019 electric service regulatory rate review, approving nonunanimous stipulation and agreements. The order resulted in a decrease of $32 million to Ameren Missouri’s annual revenue requirement for electric retail service, which reflected infrastructure investments as of December 31, 2019. The order also provided for the continued use of the FAC and trackers for pension and postretirement benefits, uncertain income tax positions, and certain excess deferred income taxes that the MoPSC previously authorized in earlier electric rate orders. The order reduced the annualized base level of net energy costs pursuant to the FAC by approximately $115 million from the base level established in the MoPSC’s March 2017 electric rate order. The order also changed the annualized regulatory asset and liability amortization amounts and the base level of expenses for trackers. On an annualized basis, these changes reflect approximately $20 million of increased revenues and approximate decreases in purchased power expenses of $15 million, other operating and maintenance expenses of $60 million, and income tax expenses of $20 million. Additionally, the annual revenue requirement incorporated increases of approximately $50 million for the reduction in sales volumes resulting from MEEIA programs and approximately $50 million of depreciation and amortization expense for amounts previously deferred under PISA. The increase in the annual revenue requirement related to the MEEIA programs is seasonally weighted to the summer. One of the stipulation and agreements approved by the MoPSC’s March 2020 order states that the net impact of the revenue and expense changes noted above reflects a 9.4% to 9.8% ROE on an unspecified percent of common equity applicable to rate base. In addition, the order required Ameren Missouri to donate $8 million to low-income assistance programs, which was reflected in results of operations in the first quarter of 2020. The new rates, base level of expenses, and amortizations became effective on April 1, 2020. In April 2020, the MoPSC issued another order in Ameren Missouri’s July 2019 electric service regulatory rate review, reaffirming the existing percentage of net energy cost variances allowed to be recovered or refunded under the FAC.
Wind Generation Facilities
In December 2020, Ameren Missouri acquired a 400-MW wind generation project located in northeastern Missouri for approximately $615 million, and placed the assets in service as the High Prairie Renewable Energy Center. The purchase price included $564 million of cash, a deferred purchase price obligation withheld as credit support in relation to certain potential claims, contingent consideration, and transaction costs. In January 2021, Ameren Missouri acquired an up-to 300-MW wind generation project located in northwestern Missouri. At the date of this filing, Ameren Missouri placed 120 MWs in service as the Atchison Renewable Energy Center, with a purchase price of approximately $200 million, including transaction costs. There have been changes to the schedule for this project, particularly as a result of component delivery delays. Ameren Missouri expects approximately 150 MWs of the up-to 300-MW project to be in service by the end of the first quarter of 2021, and the remaining portion to be in service later in 2021. Both renewable energy centers are expected to support Ameren Missouri’s compliance with the Missouri renewable energy standard.
MEEIA
In August 2020, the MoPSC issued an order approving a unanimous stipulation and agreement with respect to the 2022 program year of Ameren Missouri’s six-year MEEIA 2019 program. The order established performance incentives that would provide Ameren Missouri an opportunity to earn additional revenues, including $11 million if Ameren Missouri achieves certain energy-efficiency goals during the 2022 program year and an additional $1 million if Ameren Missouri exceeds its targeted energy-efficiency goals. Ameren Missouri intends to invest $70 million in energy-efficiency programs during the 2022 program year. The August 2020 order also approved Ameren Missouri’s energy savings results for the first year of the MEEIA 2019 program. As a result of this order and in accordance with revenue recognition guidance, Ameren Missouri recognized revenues of $6 million during 2020. As a result of MoPSC orders issued in September 2017, October 2018, January 2019, and September 2019 related to performance incentives for the MEEIA 2013 and MEEIA 2016 programs, and in accordance with revenue recognition guidance, Ameren Missouri recognized revenues of $37 million and $11 million during 2019 and 2018, respectively.
Requests for Accounting Authority Orders Related to COVID-19 Pandemic Costs
Ameren Missouri suspended disconnections for customer nonpayment and late fees in mid-March 2020, and resumed those activities for commercial and industrial customers in mid-July 2020 and residential customers in early August 2020. In October 2020, Ameren Missouri filed requests with the MoPSC for accounting authority orders related to its electric and natural gas services. If issued as requested, the orders would allow Ameren Missouri to accumulate certain costs incurred related to the COVID-19 pandemic, including bad debt write-offs, net of cost savings, as well as forgone customer late fee and reconnection fee revenues, for a specified time period, for potential recovery in future electric and natural gas service regulatory rate reviews. Costs incurred, net of savings, and forgone customer late fee and reconnection fee revenues related to the COVID-19 pandemic from March 2020 through December 2020 were immaterial. The MoPSC is under no deadline to issue orders, and Ameren Missouri cannot predict the ultimate outcome of these regulatory proceedings.
Illinois
Electric Distribution Service Rates
In December 2020, the ICC issued an order in Ameren Illinois’ annual update filing that approved a $49 million decrease in Ameren Illinois’ electric distribution service rates beginning in January 2021. This order reflected a decrease to the annual formula rate based on 2019 actual costs, a decrease to include the 2019 revenue requirement reconciliation adjustment, and a decrease for the conclusion of the 2018 revenue requirement reconciliation adjustment, which was fully collected from customers in 2020, consistent with the ICC’s December 2019 annual update filing order. It also reflected an increase based on expected net plant additions for 2020.
Request to Continue Electric Distribution Service Rate Reconciliation
In April 2020, Ameren Illinois filed a request with the ICC, which, if approved, would allow Ameren Illinois to continue to reconcile electric distribution service rates to the last annual revenue requirement approved by the ICC under the performance-based formula ratemaking framework, for a period of up to two years after the framework expires or is no longer elected. Ameren Illinois expects a decision by the ICC in March 2021.
Electric Customer Energy-Efficiency Investments
In May 2020, Ameren Illinois filed its annual electric customer energy-efficiency formula rate update to establish the revenue requirement to be used for 2021 rates with the ICC. In December 2020, the ICC issued an order that approved 2021 electric customer energy-efficiency rates of $51 million, which represents an increase of $7 million from 2020 rates.
January 2021 Natural Gas Delivery Service Rate Order
In January 2021, the ICC issued an order in Ameren Illinois’ February 2020 natural gas delivery service regulatory rate review, which resulted in an increase to its annual revenues for natural gas delivery service of $76 million based on a 9.67% allowed ROE, a capital structure composed of 52% common equity, and a rate base of $2.1 billion. The new rates became effective in January 2021. As a result of this order, the rate base under the QIP was reset to zero. Ameren Illinois used a 2021 future test year in this proceeding.
QIP Prudence Review
In March 2019, Ameren Illinois filed a request for an ICC prudence review of natural gas infrastructure investments recovered under the QIP during 2018. In November 2019, the Illinois Attorney General’s office challenged the recovery of capital investments, among other things, that were made during 2018, alleging that the amount of investments is excessive based on a comparison to historical investment levels. The Illinois Attorney General’s office is not alleging imprudence or that the investments do not qualify for recovery. In March 2020, the ICC staff filed testimony that supports the prudence and reasonableness of the capital investments made during 2018. Ameren Illinois’ 2018 QIP rate recovery under review by the ICC is within the rate increase limitations allowed by law. Ameren Illinois expects a decision by the ICC in this proceeding within the first half of 2021.
Service Disconnection Moratorium Proceeding
In March 2020, the ICC issued an order requiring all Illinois electric distribution and natural gas utilities to suspend disconnections and late fees for customer nonpayment, on an interim basis, effective March 18, 2020. Pursuant to an ICC order issued in June 2020 and following a voluntary extension of the suspension of residential disconnections, Ameren Illinois resumed disconnection activities for commercial and industrial customers for nonpayment in early August 2020 and residential customers in mid-September 2020, with the exception of residential customers classified as low income, expressing a financial hardship, or relying on medical equipment. Disconnections for nonpayment for these and all other residential customers are expected to begin in April 2021, which is after the annual winter moratorium period on disconnections that ends March 31, 2021. Ameren Illinois began the winter moratorium on November 18, 2020, which has historically started at the beginning of December. Ameren Illinois also resumed charging late fees to all customers in late July 2020. The June 2020 order requires Ameren Illinois to implement more flexible credit and collection practices, on a temporary basis, including longer deferred payment arrangements, extending to 24 months in certain cases, and programs to provide financial assistance to customers. In addition, the order allows Ameren Illinois to recover up to $8 million in costs incurred related to the financial assistance programs. The portion of these costs associated with Ameren Illinois’ electric distribution business will be recovered through its bad debt rider and the portion associated with its natural gas distribution business will be recovered through a special purpose rider established by the order. The order also allows Ameren Illinois to recover forgone customer late fees and costs incurred related to the COVID-19 pandemic. The portion of these forgone late fees and costs associated with Ameren Illinois’ electric distribution business will be recovered through formula rates and the portion associated with its natural gas distribution business will be recovered through the special purpose rider. In addition, the order allows Ameren Illinois’ electric distribution business to recover bad debt expense for 2020, instead of write-offs net of subsequent recoveries, through future true-ups in its bad debt rider. The bad debt rider reverted to the recovery of bad debt write-offs, net of any subsequent recoveries, in 2021.
Federal
Transmission Formula Rate Revisions
In February 2020, the MISO, on behalf of Ameren Missouri, Ameren Illinois, and ATXI, filed requests with the FERC to revise each company’s transmission formula rate calculations with respect to calculation inputs for materials and supplies. In May 2020, the FERC issued orders approving the revisions prospectively. In addition, the FERC declined to order refunds for earlier periods, as requested by intervenors in Ameren Illinois’ filing, but directed its audit staff to review historical rate recovery in connection with an ongoing FERC audit. This review could lead the FERC to ultimately require refunds for periods prior to 2019. In June 2020, Ameren Missouri, Ameren Illinois, and ATXI filed requests for rehearing arguing, among other things, the revisions should be applied retrospectively to include the period January 1, 2019, to June 1, 2020, and that the FERC should not require refunds for periods prior to 2019. In July 2020, the FERC denied the rehearing requests without addressing the issues raised. In July 2020, Ameren Missouri, Ameren Illinois, and ATXI filed an appeal of the July 2020 rehearing denials to the United States Court of Appeals for the District of Columbia Circuit, which is under no deadline to address the appeal. In October 2020, the FERC issued an order reaffirming its May 2020 order and denying the arguments raised in the rehearing requests filed by Ameren Missouri, Ameren Illinois, and ATXI. Pursuant to the May 2020 order, in the second quarter of 2020, Ameren and Ameren Illinois recorded a $2 million reduction to revenue for the period of January 2019 through May 2020. Regardless of the outcome of the appeal, the impacts of the May 2020 and October 2020 orders are not expected to be material to Ameren’s, Ameren Missouri’s, or Ameren Illinois’ results of operations, financial position, or liquidity.
FERC Complaint Cases
In November 2013, a customer group filed a complaint case with the FERC seeking a reduction in the allowed base ROE for FERC-regulated transmission rate base under the MISO tariff from 12.38% to 9.15%. In September 2016, the FERC issued an order in the November 2013 complaint case, which lowered the allowed base ROE to 10.32%, or a 10.82% total allowed ROE with the inclusion of a 50 basis point incentive adder for participation in an RTO, that was effective from late September 2016 forward. The September 2016 order also required refunds for the period November 2013 to February 2015, which were paid in 2017. With the maximum FERC-allowed refund period for the November 2013 complaint case ended in February 2015, another customer complaint case was filed in February 2015, seeking a further reduction in the allowed base ROE for the period of February 2015 to May 2016. In November 2019, the FERC issued an order addressing the November 2013 complaint case, which set the allowed base ROE at 9.88% and required refunds, with interest, for the periods November 2013 to February 2015 and from late September 2016 forward. The order also dismissed the February 2015 complaint case. In December 2019, Ameren and the MISO transmission owners, including Ameren Missouri, Ameren Illinois, and ATXI, filed requests for rehearing with the FERC. Additionally, in December 2019, various parties filed requests for rehearing with the FERC, challenging the dismissal of the February 2015 complaint case. In May 2020, the FERC issued an order addressing the requests for rehearing, which set the allowed base ROE at 10.02%, superseding the 9.88% previously ordered, and required refunds, with interest, for the periods November 2013 to February 2015 and from late September 2016 forward. The May 2020 order also denied rehearing of the FERC’s dismissal of the February 2015 complaint case. In June 2020, various parties filed requests for rehearing with the FERC, challenging the new ROE methodology established by the May 2020 order. In July 2020, the FERC denied the rehearing requests without addressing the issues raised, and indicated it will address the requests for rehearing in a future order. Also in July 2020, Ameren Missouri, Ameren Illinois, and ATXI filed an appeal of the May 2020 order to the United States Court of Appeals for the District of Columbia Circuit challenging the refunds for the period from September 2016 to May 2020. The court is under no deadline to address the appeal. In November 2020, the FERC issued an order reaffirming its May 2020 order in regards to the 10.02% allowed base ROE and the refund periods and denying the arguments raised in the rehearing requests.
As a result of the May 2020 order, which increased the FERC-allowed ROE from 9.88% to 10.02% for the periods November 2013 to February 2015 and late September 2016 forward, Ameren and Ameren Illinois recognized income of $13 million and $7 million, respectively, during the second quarter of 2020. As of December 31, 2020, Ameren and Ameren Illinois had recorded current regulatory liabilities of $15 million and $7 million, respectively, to reflect the expected refunds, including interest, associated with the allowed base ROE set by the May 2020 order in the November 2013 complaint case. The increase in the FERC-allowed base ROE resulting from the May 2020 order is not material to Ameren Missouri’s results of operations, financial position, or liquidity.
Regulatory Assets and Liabilities
The following table presents our regulatory assets and regulatory liabilities at December 31, 2020 and 2019:
20202019
Ameren
Missouri
Ameren
Illinois
AmerenAmeren
Missouri
Ameren
Illinois
Ameren
Regulatory assets:
Under-recovered FAC(a)
$48 $ $48 $— $— $— 
Under-recovered Illinois electric power costs(b)
 4 4 — 
MTM derivative losses(c)
21 200 221 12 242 254 
IEIMA revenue requirement reconciliation adjustment(d)(e)
   — 17 17 
FERC revenue requirement reconciliation adjustment(f)
 28 50 — 16 
Under-recovered VBA(g)
 11 11 — — — 
Pension and postretirement benefit costs(h)
   26 33 
Income taxes(i)
117 65 183 114 61 177 
Bad debt rider(j)
 11 11 — — — 
Callaway costs(e)(k)
14  14 18 — 18 
Callaway refueling and maintenance outage costs(l)
39  39 — — — 
Unamortized loss on reacquired debt(m)
52 22 74 55 31 86 
Environmental cost riders(n)
 93 93 — 127 127 
Storm costs(e)(o)
 7 7 — 
Workers’ compensation claims(p)
4 5 9 11 
Allowance for funds used during construction for pollution control equipment(e)(q)
15  15 15 — 15 
Customer generation rebate program(e)(r)
 17 17 — 
Solar rebate program(s)
5  5 — 
PISA(e)(t)
78  78 41 — 41 
RESRAM(u)
2  2 — 
FEJA energy-efficiency rider(e)(v)
 283 283 — 211 211 
Other12 33 45 13 16 29 
Total regulatory assets$407 $779 $1,209 $293 $751 $1,061 
Less: current regulatory assets(60)(37)(109)(8)(57)(69)
Noncurrent regulatory assets$347 $742 $1,100 $285 $694 $992 
Regulatory liabilities:
Over-recovered FAC(a)
$10 $ $10 $39 $— $39 
Over-recovered Illinois electric power costs(b)
 15 15 — 11 11 
Over-recovered PGA(b)
7 15 22 14 22 
Over-recovered VBA(g)
   — 
MTM derivative gains(c)
11 10 21 18 21 
IEIMA revenue requirement reconciliation adjustment(d)
 22 22 — 18 18 
FERC revenue requirement reconciliation adjustment(f)
 21 21 — 37 38 
Estimated refund for FERC complaint cases(w)
 7 15 — 23 40 
Income taxes(i)
1,317 790 2,192 1,428 813 2,326 
Cost of removal(x)
1,027 873 1,923 1,041 827 1,884 
AROs(y)
436  436 303 — 303 
Pension and postretirement benefit costs(h)
198 177 375 — — — 
Pension and postretirement benefit costs tracker(z)
55  55 72 — 72 
Renewable energy credits and zero emission credits(aa)
 200 200 — 155 155 
Excess income taxes collected in 2018(ab)
45  45 60 — 60 
Other30 21 51 30 24 54 
Total regulatory liabilities$3,136 $2,151 $5,403 $2,999 $1,933 $5,051 
Less: current regulatory liabilities(26)(88)(121)(62)(84)$(164)
Noncurrent regulatory liabilities$3,110 $2,063 $5,282 $2,937 $1,849 $4,887 
(a)Under-recovered or over-recovered fuel costs to be recovered or refunded through the FAC. Specific accumulation periods aggregate the under-recovered or over-recovered costs over four months, any related adjustments that occur over the following four months, and the recovery from, or refund to, customers that occurs over the next eight months.
(b)Under-recovered or over-recovered costs from utility customers. Amounts will be recovered from, or refunded to, customers within one year of the deferral.
(c)Deferral of commodity-related derivative MTM losses or gains. See Note 7 – Derivative Financial Instruments for additional information.
(d)The difference between Ameren Illinois’ electric distribution service annual revenue requirement calculated under the performance-based formula ratemaking framework and the revenue requirement included in customer rates for that year. Any under-recovery or over-recovery will be recovered from, or refunded to, customers with interest within two years.
(e)These assets earn a return at the applicable WACC.
(f)Ameren Illinois’ and ATXI’s annual revenue requirement reconciliation calculated pursuant to the FERC’s electric transmission formula ratemaking framework. Any under-recovery or over-recovery will be recovered from, or refunded to, customers within two years.
(g)Under-recovered or over-recovered natural gas revenue caused by sales volume deviations from weather normalized sales approved by the ICC in rate regulatory reviews. Each year’s amount will be recovered from or refunded to customers from April through December of the following year.
(h)Under-recovered or over-recovered costs are being amortized in proportion to the recognition of prior service costs (credits) and actuarial losses (gains) attributable to Ameren’s pension plan and postretirement benefit plans. See Note 10 – Retirement Benefits for additional information.
(i)The regulatory assets represent amounts that will be recovered from customers for deferred income taxes related to the equity component of allowance for funds used during construction and the effects of tax rate changes. The regulatory liabilities represent amounts that will be refunded to customers for deferred income taxes related to depreciation differences, other tax liabilities, and the unamortized portion of investment tax credits recorded at rates in excess of current statutory rates. Amounts associated with the equity component of allowance for funds used during construction, and the unamortized portion of investment tax credits will be amortized over the expected life of the related assets. For net regulatory liabilities related to deferred income taxes recorded at rates other than the current statutory rate, the weighted-average remaining amortization periods at Ameren, Ameren Missouri, and Ameren Illinois are 34, 26, and 42 years.
(j)A rider for the difference between the level of bad debt write-offs, net of any subsequent recoveries, incurred by Ameren Illinois and the level of such costs included in electric distribution and natural gas delivery service rates. Pursuant to the June 2020 ICC order in the service disconnection moratorium proceeding discussed above, Ameren Illinois’ electric distribution bad debt rider provided for the recovery of bad debt expense in 2020. The under-recovery or over-recovery for each year is recovered from, or refunded to, customers over a twelve-month period beginning June the following year.
(k)Ameren Missouri’s Callaway Energy Center operations and maintenance expenses, property taxes, and carrying costs incurred between the plant in-service date and the date the plant was reflected in rates. These costs are being amortized over the original remaining life of the energy center.
(l)In February 2020, the MoPSC issued an order approving a stipulation and agreement allowing Ameren Missouri to defer and amortize maintenance expenses related to scheduled refueling and maintenance outages at its Callaway Energy Center. Maintenance expenses are amortized over the period between refueling and maintenance outages, which has historically been approximately 18 months. Amortization began in January 2021 and will continue until the completion of the next refueling and maintenance outage.
(m)Losses related to reacquired debt. These amounts are being amortized over the lives of the related new debt issuances or the original lives of the old debt issuances if no new debt was issued.
(n)The recoverable portion of accrued environmental site liabilities that will be collected from electric and natural gas customers through ICC-approved cost recovery riders. The period of recovery will depend on the timing of remediation expenditures. See Note 14 – Commitments and Contingencies for additional information.
(o)Storm costs from 2016, 2018, and 2020 deferred in accordance with the IEIMA. These costs are being amortized over five-year periods beginning in the year the storm occurred.
(p)The period of recovery will depend on the timing of actual expenditures.
(q)The MoPSC’s May 2010 electric rate order allowed Ameren Missouri to record an allowance for funds used during construction for pollution control equipment at its Sioux Energy Center until the cost of that equipment was included in customer rates beginning in 2011. These costs are being amortized over the expected life of the Sioux Energy Center, currently through 2033.
(r)Costs associated with Ameren Illinois’ customer generation rebate program. Costs are amortized over a 15-year period, beginning in the year rebates are paid.
(s)Costs associated with Ameren Missouri’s solar rebate program. The amortization period for these assets will be determined in a future electric service regulatory rate review.
(t)Under the PISA, Ameren Missouri is permitted to defer and recover 85% of the depreciation expense and earn a return at the applicable WACC on investments in certain property, plant, and equipment placed in service after September 1, 2018, and not included in base rates. Accumulated PISA deferrals are added to rate base prospectively and amortized over a period of 20 years following a regulatory rate review.
(u)Costs associated with Ameren Missouri’s compliance with the state of Missouri’s renewable energy standard. Costs incurred over a twelve-month period beginning each August are amortized over a twelve-month period beginning February the following year.
(v)The electric energy-efficiency investments are being amortized over their weighted-average useful lives beginning in the period in which they were made, with current remaining amortization periods ranging from 6 to 13 years.
(w)The 2020 balances represent the estimated refunds to transmission customers related to the May 2020 FERC order in the November 2013 FERC complaint case. The 2019 balances represent the estimated refunds to transmission customers related to the November 2019 FERC order in the November 2013 FERC complaint case. See further discussion of the FERC ROE complaint cases above.
(x)Estimated funds collected from customers to pay for the future removal cost of property, plant, and equipment retired from service, net of salvage.
(y)The ARO regulatory liability includes the nuclear decommissioning trust fund balance (December 31, 2020 - $982 million), net of recoverable removal costs for AROs (December 31, 2020 - $546 million). See Note 1 – Summary of Significant Accounting Policies – Asset Retirement Obligations.
(z)A regulatory recovery mechanism for the difference between the level of pension and postretirement benefit costs incurred by Ameren Missouri and the level of such costs included in customer rates. The period of refund varies based on MoPSC approval in a regulatory rate review. For costs incurred prior to 2019, the weighted-average remaining amortization period is four years. For costs incurred during 2019 and after, the amortization period will be determined in a future electric service regulatory rate review.
(aa)Funds collected for the purchase of renewable energy credits and zero emission credits through IPA procurements. The balance will be amortized as the credits are purchased.
(ab)The excess amount collected in rates related to the TCJA from January 1, 2018, through July 31, 2018. The regulatory liability is being amortized over a three-year period, which began in April 2020.