falseFY20260001004315P4Y0.7512.43129xbrli:sharesiso4217:GBPiso4217:GBPxbrli:sharesiso4217:USDnggtf:siteutr:MWnggtf:business_unitnggtf:employeexbrli:purenggtf:categoryutr:MMBTUutr:TWhutr:GWhnggtf:plannggtf:arrangementiso4217:USDiso4217:GBPiso4217:EURiso4217:GBPiso4217:USDiso4217:EURnggtf:investmentnggtf:operatoriso4217:EURxbrli:shares00010043152025-04-012026-03-310001004315dei:BusinessContactMember2025-04-012026-03-310001004315ifrs-full:OrdinarySharesMember2025-04-012026-03-310001004315nggtf:AmericanDepositarySharesMember2025-04-012026-03-310001004315nggtf:A5.602NotesDue2028Member2025-04-012026-03-310001004315nggtf:A5.809NotesDue2033Member2025-04-012026-03-310001004315nggtf:A5.418NotesDue2034Member2025-04-012026-03-3100010043152026-03-3100010043152024-04-012025-03-3100010043152023-04-012024-03-310001004315ifrs-full:IssuedCapitalMember2023-03-310001004315ifrs-full:SharePremiumMember2023-03-310001004315ifrs-full:RetainedEarningsMember2023-03-310001004315ifrs-full:OtherReservesMember2023-03-310001004315ifrs-full:EquityAttributableToOwnersOfParentMember2023-03-310001004315ifrs-full:NoncontrollingInterestsMember2023-03-3100010043152023-03-310001004315ifrs-full:RetainedEarningsMember2023-04-012024-03-310001004315ifrs-full:EquityAttributableToOwnersOfParentMember2023-04-012024-03-310001004315ifrs-full:NoncontrollingInterestsMember2023-04-012024-03-310001004315ifrs-full:OtherReservesMember2023-04-012024-03-310001004315ifrs-full:IssuedCapitalMember2023-04-012024-03-310001004315ifrs-full:SharePremiumMember2023-04-012024-03-310001004315ifrs-full:IssuedCapitalMember2024-03-310001004315ifrs-full:SharePremiumMember2024-03-310001004315ifrs-full:RetainedEarningsMember2024-03-310001004315ifrs-full:OtherReservesMember2024-03-310001004315ifrs-full:EquityAttributableToOwnersOfParentMember2024-03-310001004315ifrs-full:NoncontrollingInterestsMember2024-03-3100010043152024-03-310001004315ifrs-full:RetainedEarningsMember2024-04-012025-03-310001004315ifrs-full:EquityAttributableToOwnersOfParentMember2024-04-012025-03-310001004315ifrs-full:NoncontrollingInterestsMember2024-04-012025-03-310001004315ifrs-full:OtherReservesMember2024-04-012025-03-310001004315ifrs-full:IssuedCapitalMember2024-04-012025-03-310001004315ifrs-full:SharePremiumMember2024-04-012025-03-310001004315ifrs-full:IssuedCapitalMember2025-03-310001004315ifrs-full:SharePremiumMember2025-03-310001004315ifrs-full:RetainedEarningsMember2025-03-310001004315ifrs-full:OtherReservesMember2025-03-310001004315ifrs-full:EquityAttributableToOwnersOfParentMember2025-03-310001004315ifrs-full:NoncontrollingInterestsMember2025-03-3100010043152025-03-310001004315ifrs-full:RetainedEarningsMember2025-04-012026-03-310001004315ifrs-full:EquityAttributableToOwnersOfParentMember2025-04-012026-03-310001004315ifrs-full:NoncontrollingInterestsMember2025-04-012026-03-310001004315ifrs-full:OtherReservesMember2025-04-012026-03-310001004315ifrs-full:IssuedCapitalMember2025-04-012026-03-310001004315ifrs-full:SharePremiumMember2025-04-012026-03-310001004315ifrs-full:IssuedCapitalMember2026-03-310001004315ifrs-full:SharePremiumMember2026-03-310001004315ifrs-full:RetainedEarningsMember2026-03-310001004315ifrs-full:OtherReservesMember2026-03-310001004315ifrs-full:EquityAttributableToOwnersOfParentMember2026-03-310001004315ifrs-full:NoncontrollingInterestsMember2026-03-310001004315nggtf:NationalGridRenewablesMember2025-04-012026-03-310001004315nggtf:NationalGridRenewablesMember2024-04-012025-03-310001004315nggtf:NationalGridRenewablesMember2023-04-012024-03-310001004315nggtf:GrainLNGMember2025-04-012026-03-310001004315nggtf:GrainLNGMember2024-04-012025-03-310001004315nggtf:GrainLNGMember2023-04-012024-03-310001004315nggtf:UKElectricitySystemOperatorMember2025-04-012026-03-310001004315nggtf:UKElectricitySystemOperatorMember2024-04-012025-03-310001004315nggtf:UKElectricitySystemOperatorMember2023-04-012024-03-310001004315nggtf:UKGasTransmissionMember2025-04-012026-03-310001004315nggtf:UKGasTransmissionMember2024-04-012025-03-310001004315nggtf:UKGasTransmissionMember2023-04-012024-03-310001004315nggtf:NationalGridRenewablesAndEmeraldEnergyVentureLLCMember2025-04-012026-03-310001004315nggtf:NationalGridRenewablesAndEmeraldEnergyVentureLLCMember2024-04-012025-03-310001004315nggtf:NationalGridRenewablesAndEmeraldEnergyVentureLLCMember2023-04-012024-03-310001004315srt:MinimumMembernggtf:FixedInterestRateBondsMember2026-03-310001004315nggtf:MajorIssuanceOfBondsMember2026-04-300001004315nggtf:ElectricityGenerationPlantMember2026-03-310001004315nggtf:LiquefiedNaturalGasMembersrt:ScenarioForecastMember2050-03-310001004315stpr:NY2025-04-012026-03-310001004315nggtf:NewEnglandSegmentMember2025-04-012026-03-310001004315nggtf:ProvisionForDecommissioningAROMember2026-03-310001004315nggtf:UKElectricityTransmissionMemberifrs-full:OperatingSegmentsMember2025-04-012026-03-310001004315nggtf:UKElectricityTransmissionMemberifrs-full:EliminationOfIntersegmentAmountsMember2025-04-012026-03-310001004315nggtf:UKElectricityTransmissionMember2025-04-012026-03-310001004315nggtf:UKElectricityTransmissionMemberifrs-full:OperatingSegmentsMember2024-04-012025-03-310001004315nggtf:UKElectricityTransmissionMemberifrs-full:EliminationOfIntersegmentAmountsMember2024-04-012025-03-310001004315nggtf:UKElectricityTransmissionMember2024-04-012025-03-310001004315nggtf:UKElectricityTransmissionMemberifrs-full:OperatingSegmentsMember2023-04-012024-03-310001004315nggtf:UKElectricityTransmissionMemberifrs-full:EliminationOfIntersegmentAmountsMember2023-04-012024-03-310001004315nggtf:UKElectricityTransmissionMember2023-04-012024-03-310001004315nggtf:UKElectricityDistributionMemberifrs-full:OperatingSegmentsMember2025-04-012026-03-310001004315nggtf:UKElectricityDistributionMemberifrs-full:EliminationOfIntersegmentAmountsMember2025-04-012026-03-310001004315nggtf:UKElectricityDistributionMember2025-04-012026-03-310001004315nggtf:UKElectricityDistributionMemberifrs-full:OperatingSegmentsMember2024-04-012025-03-310001004315nggtf:UKElectricityDistributionMemberifrs-full:EliminationOfIntersegmentAmountsMember2024-04-012025-03-310001004315nggtf:UKElectricityDistributionMember2024-04-012025-03-310001004315nggtf:UKElectricityDistributionMemberifrs-full:OperatingSegmentsMember2023-04-012024-03-310001004315nggtf:UKElectricityDistributionMemberifrs-full:EliminationOfIntersegmentAmountsMember2023-04-012024-03-310001004315nggtf:UKElectricityDistributionMember2023-04-012024-03-310001004315nggtf:UKElectricitySystemOperatorMemberifrs-full:OperatingSegmentsMember2025-04-012026-03-310001004315nggtf:UKElectricitySystemOperatorMemberifrs-full:EliminationOfIntersegmentAmountsMember2025-04-012026-03-310001004315nggtf:UKElectricitySystemOperatorMember2025-04-012026-03-310001004315nggtf:UKElectricitySystemOperatorMemberifrs-full:OperatingSegmentsMember2024-04-012025-03-310001004315nggtf:UKElectricitySystemOperatorMemberifrs-full:EliminationOfIntersegmentAmountsMember2024-04-012025-03-310001004315nggtf:UKElectricitySystemOperatorMember2024-04-012025-03-310001004315nggtf:UKElectricitySystemOperatorMemberifrs-full:OperatingSegmentsMember2023-04-012024-03-310001004315nggtf:UKElectricitySystemOperatorMemberifrs-full:EliminationOfIntersegmentAmountsMember2023-04-012024-03-310001004315nggtf:UKElectricitySystemOperatorMember2023-04-012024-03-310001004315nggtf:NewEnglandSegmentMemberifrs-full:OperatingSegmentsMember2025-04-012026-03-310001004315nggtf:NewEnglandSegmentMemberifrs-full:EliminationOfIntersegmentAmountsMember2025-04-012026-03-310001004315nggtf:NewEnglandSegmentMember2025-04-012026-03-310001004315nggtf:NewEnglandSegmentMemberifrs-full:OperatingSegmentsMember2024-04-012025-03-310001004315nggtf:NewEnglandSegmentMemberifrs-full:EliminationOfIntersegmentAmountsMember2024-04-012025-03-310001004315nggtf:NewEnglandSegmentMember2024-04-012025-03-310001004315nggtf:NewEnglandSegmentMemberifrs-full:OperatingSegmentsMember2023-04-012024-03-310001004315nggtf:NewEnglandSegmentMemberifrs-full:EliminationOfIntersegmentAmountsMember2023-04-012024-03-310001004315nggtf:NewEnglandSegmentMember2023-04-012024-03-310001004315nggtf:NewYorkSegmentMemberifrs-full:OperatingSegmentsMember2025-04-012026-03-310001004315nggtf:NewYorkSegmentMemberifrs-full:EliminationOfIntersegmentAmountsMember2025-04-012026-03-310001004315nggtf:NewYorkSegmentMember2025-04-012026-03-310001004315nggtf:NewYorkSegmentMemberifrs-full:OperatingSegmentsMember2024-04-012025-03-310001004315nggtf:NewYorkSegmentMemberifrs-full:EliminationOfIntersegmentAmountsMember2024-04-012025-03-310001004315nggtf:NewYorkSegmentMember2024-04-012025-03-310001004315nggtf:NewYorkSegmentMemberifrs-full:OperatingSegmentsMember2023-04-012024-03-310001004315nggtf:NewYorkSegmentMemberifrs-full:EliminationOfIntersegmentAmountsMember2023-04-012024-03-310001004315nggtf:NewYorkSegmentMember2023-04-012024-03-310001004315nggtf:NationalGridVenturesMemberifrs-full:OperatingSegmentsMember2025-04-012026-03-310001004315nggtf:NationalGridVenturesMemberifrs-full:EliminationOfIntersegmentAmountsMember2025-04-012026-03-310001004315nggtf:NationalGridVenturesMember2025-04-012026-03-310001004315nggtf:NationalGridVenturesMemberifrs-full:OperatingSegmentsMember2024-04-012025-03-310001004315nggtf:NationalGridVenturesMemberifrs-full:EliminationOfIntersegmentAmountsMember2024-04-012025-03-310001004315nggtf:NationalGridVenturesMember2024-04-012025-03-310001004315nggtf:NationalGridVenturesMemberifrs-full:OperatingSegmentsMember2023-04-012024-03-310001004315nggtf:NationalGridVenturesMemberifrs-full:EliminationOfIntersegmentAmountsMember2023-04-012024-03-310001004315nggtf:NationalGridVenturesMember2023-04-012024-03-310001004315nggtf:OtherSegmentsMemberifrs-full:OperatingSegmentsMember2025-04-012026-03-310001004315nggtf:OtherSegmentsMemberifrs-full:EliminationOfIntersegmentAmountsMember2025-04-012026-03-310001004315nggtf:OtherSegmentsMember2025-04-012026-03-310001004315nggtf:OtherSegmentsMemberifrs-full:OperatingSegmentsMember2024-04-012025-03-310001004315nggtf:OtherSegmentsMemberifrs-full:EliminationOfIntersegmentAmountsMember2024-04-012025-03-310001004315nggtf:OtherSegmentsMember2024-04-012025-03-310001004315nggtf:OtherSegmentsMemberifrs-full:OperatingSegmentsMember2023-04-012024-03-310001004315nggtf:OtherSegmentsMemberifrs-full:EliminationOfIntersegmentAmountsMember2023-04-012024-03-310001004315nggtf:OtherSegmentsMember2023-04-012024-03-310001004315ifrs-full:OperatingSegmentsMember2025-04-012026-03-310001004315ifrs-full:EliminationOfIntersegmentAmountsMember2025-04-012026-03-310001004315ifrs-full:OperatingSegmentsMember2024-04-012025-03-310001004315ifrs-full:EliminationOfIntersegmentAmountsMember2024-04-012025-03-310001004315ifrs-full:OperatingSegmentsMember2023-04-012024-03-310001004315ifrs-full:EliminationOfIntersegmentAmountsMember2023-04-012024-03-310001004315ifrs-full:CountryOfDomicileMember2025-04-012026-03-310001004315ifrs-full:CountryOfDomicileMember2024-04-012025-03-310001004315ifrs-full:CountryOfDomicileMember2023-04-012024-03-310001004315country:US2025-04-012026-03-310001004315country:US2024-04-012025-03-310001004315country:US2023-04-012024-03-310001004315ifrs-full:OperatingSegmentsMembernggtf:UKElectricityTransmissionMembernggtf:BeforeExceptionalItemsAndRemeasurementsNettingMember2025-04-012026-03-310001004315ifrs-full:OperatingSegmentsMembernggtf:UKElectricityTransmissionMembernggtf:BeforeExceptionalItemsAndRemeasurementsNettingMember2024-04-012025-03-310001004315ifrs-full:OperatingSegmentsMembernggtf:UKElectricityTransmissionMembernggtf:BeforeExceptionalItemsAndRemeasurementsNettingMember2023-04-012024-03-310001004315ifrs-full:OperatingSegmentsMembernggtf:UKElectricityTransmissionMembernggtf:ExceptionalItemsAndRemeasurementsNettingMember2025-04-012026-03-310001004315ifrs-full:OperatingSegmentsMembernggtf:UKElectricityTransmissionMembernggtf:ExceptionalItemsAndRemeasurementsNettingMember2024-04-012025-03-310001004315ifrs-full:OperatingSegmentsMembernggtf:UKElectricityTransmissionMembernggtf:ExceptionalItemsAndRemeasurementsNettingMember2023-04-012024-03-310001004315ifrs-full:OperatingSegmentsMembernggtf:UKElectricityDistributionMembernggtf:BeforeExceptionalItemsAndRemeasurementsNettingMember2025-04-012026-03-310001004315ifrs-full:OperatingSegmentsMembernggtf:UKElectricityDistributionMembernggtf:BeforeExceptionalItemsAndRemeasurementsNettingMember2024-04-012025-03-310001004315ifrs-full:OperatingSegmentsMembernggtf:UKElectricityDistributionMembernggtf:BeforeExceptionalItemsAndRemeasurementsNettingMember2023-04-012024-03-310001004315ifrs-full:OperatingSegmentsMembernggtf:UKElectricityDistributionMembernggtf:ExceptionalItemsAndRemeasurementsNettingMember2025-04-012026-03-310001004315ifrs-full:OperatingSegmentsMembernggtf:UKElectricityDistributionMembernggtf:ExceptionalItemsAndRemeasurementsNettingMember2024-04-012025-03-310001004315ifrs-full:OperatingSegmentsMembernggtf:UKElectricityDistributionMembernggtf:ExceptionalItemsAndRemeasurementsNettingMember2023-04-012024-03-310001004315ifrs-full:OperatingSegmentsMembernggtf:UKElectricitySystemOperatorMembernggtf:BeforeExceptionalItemsAndRemeasurementsNettingMember2025-04-012026-03-310001004315ifrs-full:OperatingSegmentsMembernggtf:UKElectricitySystemOperatorMembernggtf:BeforeExceptionalItemsAndRemeasurementsNettingMember2024-04-012025-03-310001004315ifrs-full:OperatingSegmentsMembernggtf:UKElectricitySystemOperatorMembernggtf:BeforeExceptionalItemsAndRemeasurementsNettingMember2023-04-012024-03-310001004315ifrs-full:OperatingSegmentsMembernggtf:UKElectricitySystemOperatorMembernggtf:ExceptionalItemsAndRemeasurementsNettingMember2025-04-012026-03-310001004315ifrs-full:OperatingSegmentsMembernggtf:UKElectricitySystemOperatorMembernggtf:ExceptionalItemsAndRemeasurementsNettingMember2024-04-012025-03-310001004315ifrs-full:OperatingSegmentsMembernggtf:UKElectricitySystemOperatorMembernggtf:ExceptionalItemsAndRemeasurementsNettingMember2023-04-012024-03-310001004315ifrs-full:OperatingSegmentsMembernggtf:NewEnglandSegmentMembernggtf:BeforeExceptionalItemsAndRemeasurementsNettingMember2025-04-012026-03-310001004315ifrs-full:OperatingSegmentsMembernggtf:NewEnglandSegmentMembernggtf:BeforeExceptionalItemsAndRemeasurementsNettingMember2024-04-012025-03-310001004315ifrs-full:OperatingSegmentsMembernggtf:NewEnglandSegmentMembernggtf:BeforeExceptionalItemsAndRemeasurementsNettingMember2023-04-012024-03-310001004315ifrs-full:OperatingSegmentsMembernggtf:NewEnglandSegmentMembernggtf:ExceptionalItemsAndRemeasurementsNettingMember2025-04-012026-03-310001004315ifrs-full:OperatingSegmentsMembernggtf:NewEnglandSegmentMembernggtf:ExceptionalItemsAndRemeasurementsNettingMember2024-04-012025-03-310001004315ifrs-full:OperatingSegmentsMembernggtf:NewEnglandSegmentMembernggtf:ExceptionalItemsAndRemeasurementsNettingMember2023-04-012024-03-310001004315ifrs-full:OperatingSegmentsMembernggtf:NewYorkSegmentMembernggtf:BeforeExceptionalItemsAndRemeasurementsNettingMember2025-04-012026-03-310001004315ifrs-full:OperatingSegmentsMembernggtf:NewYorkSegmentMembernggtf:BeforeExceptionalItemsAndRemeasurementsNettingMember2024-04-012025-03-310001004315ifrs-full:OperatingSegmentsMembernggtf:NewYorkSegmentMembernggtf:BeforeExceptionalItemsAndRemeasurementsNettingMember2023-04-012024-03-310001004315ifrs-full:OperatingSegmentsMembernggtf:NewYorkSegmentMembernggtf:ExceptionalItemsAndRemeasurementsNettingMember2025-04-012026-03-310001004315ifrs-full:OperatingSegmentsMembernggtf:NewYorkSegmentMembernggtf:ExceptionalItemsAndRemeasurementsNettingMember2024-04-012025-03-310001004315ifrs-full:OperatingSegmentsMembernggtf:NewYorkSegmentMembernggtf:ExceptionalItemsAndRemeasurementsNettingMember2023-04-012024-03-310001004315ifrs-full:OperatingSegmentsMembernggtf:NationalGridVenturesMembernggtf:BeforeExceptionalItemsAndRemeasurementsNettingMember2025-04-012026-03-310001004315ifrs-full:OperatingSegmentsMembernggtf:NationalGridVenturesMembernggtf:BeforeExceptionalItemsAndRemeasurementsNettingMember2024-04-012025-03-310001004315ifrs-full:OperatingSegmentsMembernggtf:NationalGridVenturesMembernggtf:BeforeExceptionalItemsAndRemeasurementsNettingMember2023-04-012024-03-310001004315ifrs-full:OperatingSegmentsMembernggtf:NationalGridVenturesMembernggtf:ExceptionalItemsAndRemeasurementsNettingMember2025-04-012026-03-310001004315ifrs-full:OperatingSegmentsMembernggtf:NationalGridVenturesMembernggtf:ExceptionalItemsAndRemeasurementsNettingMember2024-04-012025-03-310001004315ifrs-full:OperatingSegmentsMembernggtf:NationalGridVenturesMembernggtf:ExceptionalItemsAndRemeasurementsNettingMember2023-04-012024-03-310001004315ifrs-full:OperatingSegmentsMembernggtf:OtherSegmentsMembernggtf:BeforeExceptionalItemsAndRemeasurementsNettingMember2025-04-012026-03-310001004315ifrs-full:OperatingSegmentsMembernggtf:OtherSegmentsMembernggtf:BeforeExceptionalItemsAndRemeasurementsNettingMember2024-04-012025-03-310001004315ifrs-full:OperatingSegmentsMembernggtf:OtherSegmentsMembernggtf:BeforeExceptionalItemsAndRemeasurementsNettingMember2023-04-012024-03-310001004315ifrs-full:OperatingSegmentsMembernggtf:OtherSegmentsMembernggtf:ExceptionalItemsAndRemeasurementsNettingMember2025-04-012026-03-310001004315ifrs-full:OperatingSegmentsMembernggtf:OtherSegmentsMembernggtf:ExceptionalItemsAndRemeasurementsNettingMember2024-04-012025-03-310001004315ifrs-full:OperatingSegmentsMembernggtf:OtherSegmentsMembernggtf:ExceptionalItemsAndRemeasurementsNettingMember2023-04-012024-03-310001004315nggtf:BeforeExceptionalItemsAndRemeasurementsNettingMember2025-04-012026-03-310001004315nggtf:BeforeExceptionalItemsAndRemeasurementsNettingMember2024-04-012025-03-310001004315nggtf:BeforeExceptionalItemsAndRemeasurementsNettingMember2023-04-012024-03-310001004315nggtf:ExceptionalItemsAndRemeasurementsNettingMember2025-04-012026-03-310001004315nggtf:ExceptionalItemsAndRemeasurementsNettingMember2024-04-012025-03-310001004315nggtf:ExceptionalItemsAndRemeasurementsNettingMember2023-04-012024-03-310001004315nggtf:BeforeExceptionalItemsAndRemeasurementsNettingMemberifrs-full:CountryOfDomicileMember2025-04-012026-03-310001004315nggtf:BeforeExceptionalItemsAndRemeasurementsNettingMemberifrs-full:CountryOfDomicileMember2024-04-012025-03-310001004315nggtf:BeforeExceptionalItemsAndRemeasurementsNettingMemberifrs-full:CountryOfDomicileMember2023-04-012024-03-310001004315nggtf:ExceptionalItemsAndRemeasurementsNettingMemberifrs-full:CountryOfDomicileMember2025-04-012026-03-310001004315nggtf:ExceptionalItemsAndRemeasurementsNettingMemberifrs-full:CountryOfDomicileMember2024-04-012025-03-310001004315nggtf:ExceptionalItemsAndRemeasurementsNettingMemberifrs-full:CountryOfDomicileMember2023-04-012024-03-310001004315nggtf:BeforeExceptionalItemsAndRemeasurementsNettingMembercountry:US2025-04-012026-03-310001004315nggtf:BeforeExceptionalItemsAndRemeasurementsNettingMembercountry:US2024-04-012025-03-310001004315nggtf:BeforeExceptionalItemsAndRemeasurementsNettingMembercountry:US2023-04-012024-03-310001004315nggtf:ExceptionalItemsAndRemeasurementsNettingMembercountry:US2025-04-012026-03-310001004315nggtf:ExceptionalItemsAndRemeasurementsNettingMembercountry:US2024-04-012025-03-310001004315nggtf:ExceptionalItemsAndRemeasurementsNettingMembercountry:US2023-04-012024-03-310001004315ifrs-full:PropertyPlantAndEquipmentMember2025-04-012026-03-310001004315ifrs-full:PropertyPlantAndEquipmentMember2024-04-012025-03-310001004315ifrs-full:PropertyPlantAndEquipmentMember2023-04-012024-03-310001004315nggtf:NonCurrentIntangibleAssetsMember2025-04-012026-03-310001004315nggtf:NonCurrentIntangibleAssetsMember2024-04-012025-03-310001004315nggtf:NonCurrentIntangibleAssetsMember2023-04-012024-03-310001004315ifrs-full:InvestmentsAccountedForUsingEquityMethodMember2025-04-012026-03-310001004315ifrs-full:InvestmentsAccountedForUsingEquityMethodMember2024-04-012025-03-310001004315ifrs-full:InvestmentsAccountedForUsingEquityMethodMember2023-04-012024-03-310001004315nggtf:CapitalExpenditurePrepaymentsMember2025-04-012026-03-310001004315nggtf:CapitalExpenditurePrepaymentsMember2024-04-012025-03-310001004315nggtf:CapitalExpenditurePrepaymentsMember2023-04-012024-03-310001004315ifrs-full:CountryOfDomicileMember2026-03-310001004315ifrs-full:CountryOfDomicileMember2025-03-310001004315ifrs-full:CountryOfDomicileMember2024-03-310001004315country:US2026-03-310001004315country:US2025-03-310001004315country:US2024-03-310001004315nggtf:UKElectricityTransmissionMembernggtf:TransmissionMember2025-04-012026-03-310001004315nggtf:UKElectricityDistributionMembernggtf:TransmissionMember2025-04-012026-03-310001004315nggtf:NewEnglandSegmentMembernggtf:TransmissionMember2025-04-012026-03-310001004315nggtf:NewYorkSegmentMembernggtf:TransmissionMember2025-04-012026-03-310001004315nggtf:NationalGridVenturesMembernggtf:TransmissionMember2025-04-012026-03-310001004315nggtf:OtherSegmentsMembernggtf:TransmissionMember2025-04-012026-03-310001004315nggtf:TransmissionMember2025-04-012026-03-310001004315nggtf:UKElectricityTransmissionMembernggtf:DistributionMember2025-04-012026-03-310001004315nggtf:UKElectricityDistributionMembernggtf:DistributionMember2025-04-012026-03-310001004315nggtf:NewEnglandSegmentMembernggtf:DistributionMember2025-04-012026-03-310001004315nggtf:NewYorkSegmentMembernggtf:DistributionMember2025-04-012026-03-310001004315nggtf:NationalGridVenturesMembernggtf:DistributionMember2025-04-012026-03-310001004315nggtf:OtherSegmentsMembernggtf:DistributionMember2025-04-012026-03-310001004315nggtf:DistributionMember2025-04-012026-03-310001004315nggtf:UKElectricityTransmissionMembernggtf:OtherProductAndServicesMember2025-04-012026-03-310001004315nggtf:UKElectricityDistributionMembernggtf:OtherProductAndServicesMember2025-04-012026-03-310001004315nggtf:NewEnglandSegmentMembernggtf:OtherProductAndServicesMember2025-04-012026-03-310001004315nggtf:NewYorkSegmentMembernggtf:OtherProductAndServicesMember2025-04-012026-03-310001004315nggtf:NationalGridVenturesMembernggtf:OtherProductAndServicesMember2025-04-012026-03-310001004315nggtf:OtherSegmentsMembernggtf:OtherProductAndServicesMember2025-04-012026-03-310001004315nggtf:OtherProductAndServicesMember2025-04-012026-03-310001004315nggtf:UKElectricityTransmissionMembernggtf:GenerationMember2025-04-012026-03-310001004315nggtf:UKElectricityDistributionMembernggtf:GenerationMember2025-04-012026-03-310001004315nggtf:NewEnglandSegmentMembernggtf:GenerationMember2025-04-012026-03-310001004315nggtf:NewYorkSegmentMembernggtf:GenerationMember2025-04-012026-03-310001004315nggtf:NationalGridVenturesMembernggtf:GenerationMember2025-04-012026-03-310001004315nggtf:OtherSegmentsMembernggtf:GenerationMember2025-04-012026-03-310001004315nggtf:GenerationMember2025-04-012026-03-310001004315nggtf:UKElectricityTransmissionMemberifrs-full:CountryOfDomicileMember2025-04-012026-03-310001004315nggtf:UKElectricityDistributionMemberifrs-full:CountryOfDomicileMember2025-04-012026-03-310001004315nggtf:NewEnglandSegmentMemberifrs-full:CountryOfDomicileMember2025-04-012026-03-310001004315nggtf:NewYorkSegmentMemberifrs-full:CountryOfDomicileMember2025-04-012026-03-310001004315nggtf:NationalGridVenturesMemberifrs-full:CountryOfDomicileMember2025-04-012026-03-310001004315nggtf:OtherSegmentsMemberifrs-full:CountryOfDomicileMember2025-04-012026-03-310001004315nggtf:UKElectricityTransmissionMembercountry:US2025-04-012026-03-310001004315nggtf:UKElectricityDistributionMembercountry:US2025-04-012026-03-310001004315nggtf:NewEnglandSegmentMembercountry:US2025-04-012026-03-310001004315nggtf:NewYorkSegmentMembercountry:US2025-04-012026-03-310001004315nggtf:NationalGridVenturesMembercountry:US2025-04-012026-03-310001004315nggtf:OtherSegmentsMembercountry:US2025-04-012026-03-310001004315nggtf:UKElectricityTransmissionMembernggtf:TransmissionMember2024-04-012025-03-310001004315nggtf:UKElectricityDistributionMembernggtf:TransmissionMember2024-04-012025-03-310001004315nggtf:UKElectricitySystemOperatorMembernggtf:TransmissionMember2024-04-012025-03-310001004315nggtf:NewEnglandSegmentMembernggtf:TransmissionMember2024-04-012025-03-310001004315nggtf:NewYorkSegmentMembernggtf:TransmissionMember2024-04-012025-03-310001004315nggtf:NationalGridVenturesMembernggtf:TransmissionMember2024-04-012025-03-310001004315nggtf:OtherSegmentsMembernggtf:TransmissionMember2024-04-012025-03-310001004315nggtf:TransmissionMember2024-04-012025-03-310001004315nggtf:UKElectricityTransmissionMembernggtf:DistributionMember2024-04-012025-03-310001004315nggtf:UKElectricityDistributionMembernggtf:DistributionMember2024-04-012025-03-310001004315nggtf:UKElectricitySystemOperatorMembernggtf:DistributionMember2024-04-012025-03-310001004315nggtf:NewEnglandSegmentMembernggtf:DistributionMember2024-04-012025-03-310001004315nggtf:NewYorkSegmentMembernggtf:DistributionMember2024-04-012025-03-310001004315nggtf:NationalGridVenturesMembernggtf:DistributionMember2024-04-012025-03-310001004315nggtf:OtherSegmentsMembernggtf:DistributionMember2024-04-012025-03-310001004315nggtf:DistributionMember2024-04-012025-03-310001004315nggtf:UKElectricityTransmissionMembernggtf:SystemOperatorMember2024-04-012025-03-310001004315nggtf:UKElectricityDistributionMembernggtf:SystemOperatorMember2024-04-012025-03-310001004315nggtf:UKElectricitySystemOperatorMembernggtf:SystemOperatorMember2024-04-012025-03-310001004315nggtf:NewEnglandSegmentMembernggtf:SystemOperatorMember2024-04-012025-03-310001004315nggtf:NewYorkSegmentMembernggtf:SystemOperatorMember2024-04-012025-03-310001004315nggtf:NationalGridVenturesMembernggtf:SystemOperatorMember2024-04-012025-03-310001004315nggtf:OtherSegmentsMembernggtf:SystemOperatorMember2024-04-012025-03-310001004315nggtf:SystemOperatorMember2024-04-012025-03-310001004315nggtf:UKElectricityTransmissionMembernggtf:OtherProductAndServicesMember2024-04-012025-03-310001004315nggtf:UKElectricityDistributionMembernggtf:OtherProductAndServicesMember2024-04-012025-03-310001004315nggtf:UKElectricitySystemOperatorMembernggtf:OtherProductAndServicesMember2024-04-012025-03-310001004315nggtf:NewEnglandSegmentMembernggtf:OtherProductAndServicesMember2024-04-012025-03-310001004315nggtf:NewYorkSegmentMembernggtf:OtherProductAndServicesMember2024-04-012025-03-310001004315nggtf:NationalGridVenturesMembernggtf:OtherProductAndServicesMember2024-04-012025-03-310001004315nggtf:OtherSegmentsMembernggtf:OtherProductAndServicesMember2024-04-012025-03-310001004315nggtf:OtherProductAndServicesMember2024-04-012025-03-310001004315nggtf:UKElectricityTransmissionMembernggtf:GenerationMember2024-04-012025-03-310001004315nggtf:UKElectricityDistributionMembernggtf:GenerationMember2024-04-012025-03-310001004315nggtf:UKElectricitySystemOperatorMembernggtf:GenerationMember2024-04-012025-03-310001004315nggtf:NewEnglandSegmentMembernggtf:GenerationMember2024-04-012025-03-310001004315nggtf:NewYorkSegmentMembernggtf:GenerationMember2024-04-012025-03-310001004315nggtf:NationalGridVenturesMembernggtf:GenerationMember2024-04-012025-03-310001004315nggtf:OtherSegmentsMembernggtf:GenerationMember2024-04-012025-03-310001004315nggtf:GenerationMember2024-04-012025-03-310001004315nggtf:UKElectricityTransmissionMemberifrs-full:CountryOfDomicileMember2024-04-012025-03-310001004315nggtf:UKElectricityDistributionMemberifrs-full:CountryOfDomicileMember2024-04-012025-03-310001004315nggtf:UKElectricitySystemOperatorMemberifrs-full:CountryOfDomicileMember2024-04-012025-03-310001004315nggtf:NewEnglandSegmentMemberifrs-full:CountryOfDomicileMember2024-04-012025-03-310001004315nggtf:NewYorkSegmentMemberifrs-full:CountryOfDomicileMember2024-04-012025-03-310001004315nggtf:NationalGridVenturesMemberifrs-full:CountryOfDomicileMember2024-04-012025-03-310001004315nggtf:OtherSegmentsMemberifrs-full:CountryOfDomicileMember2024-04-012025-03-310001004315nggtf:UKElectricityTransmissionMembercountry:US2024-04-012025-03-310001004315nggtf:UKElectricityDistributionMembercountry:US2024-04-012025-03-310001004315nggtf:UKElectricitySystemOperatorMembercountry:US2024-04-012025-03-310001004315nggtf:NewEnglandSegmentMembercountry:US2024-04-012025-03-310001004315nggtf:NewYorkSegmentMembercountry:US2024-04-012025-03-310001004315nggtf:NationalGridVenturesMembercountry:US2024-04-012025-03-310001004315nggtf:OtherSegmentsMembercountry:US2024-04-012025-03-310001004315nggtf:UKElectricityTransmissionMembernggtf:TransmissionMember2023-04-012024-03-310001004315nggtf:UKElectricityDistributionMembernggtf:TransmissionMember2023-04-012024-03-310001004315nggtf:UKElectricitySystemOperatorMembernggtf:TransmissionMember2023-04-012024-03-310001004315nggtf:NewEnglandSegmentMembernggtf:TransmissionMember2023-04-012024-03-310001004315nggtf:NewYorkSegmentMembernggtf:TransmissionMember2023-04-012024-03-310001004315nggtf:NationalGridVenturesMembernggtf:TransmissionMember2023-04-012024-03-310001004315nggtf:OtherSegmentsMembernggtf:TransmissionMember2023-04-012024-03-310001004315nggtf:TransmissionMember2023-04-012024-03-310001004315nggtf:UKElectricityTransmissionMembernggtf:DistributionMember2023-04-012024-03-310001004315nggtf:UKElectricityDistributionMembernggtf:DistributionMember2023-04-012024-03-310001004315nggtf:UKElectricitySystemOperatorMembernggtf:DistributionMember2023-04-012024-03-310001004315nggtf:NewEnglandSegmentMembernggtf:DistributionMember2023-04-012024-03-310001004315nggtf:NewYorkSegmentMembernggtf:DistributionMember2023-04-012024-03-310001004315nggtf:NationalGridVenturesMembernggtf:DistributionMember2023-04-012024-03-310001004315nggtf:OtherSegmentsMembernggtf:DistributionMember2023-04-012024-03-310001004315nggtf:DistributionMember2023-04-012024-03-310001004315nggtf:UKElectricityTransmissionMembernggtf:SystemOperatorMember2023-04-012024-03-310001004315nggtf:UKElectricityDistributionMembernggtf:SystemOperatorMember2023-04-012024-03-310001004315nggtf:UKElectricitySystemOperatorMembernggtf:SystemOperatorMember2023-04-012024-03-310001004315nggtf:NewEnglandSegmentMembernggtf:SystemOperatorMember2023-04-012024-03-310001004315nggtf:NewYorkSegmentMembernggtf:SystemOperatorMember2023-04-012024-03-310001004315nggtf:NationalGridVenturesMembernggtf:SystemOperatorMember2023-04-012024-03-310001004315nggtf:OtherSegmentsMembernggtf:SystemOperatorMember2023-04-012024-03-310001004315nggtf:SystemOperatorMember2023-04-012024-03-310001004315nggtf:UKElectricityTransmissionMembernggtf:OtherProductAndServicesMember2023-04-012024-03-310001004315nggtf:UKElectricityDistributionMembernggtf:OtherProductAndServicesMember2023-04-012024-03-310001004315nggtf:UKElectricitySystemOperatorMembernggtf:OtherProductAndServicesMember2023-04-012024-03-310001004315nggtf:NewEnglandSegmentMembernggtf:OtherProductAndServicesMember2023-04-012024-03-310001004315nggtf:NewYorkSegmentMembernggtf:OtherProductAndServicesMember2023-04-012024-03-310001004315nggtf:NationalGridVenturesMembernggtf:OtherProductAndServicesMember2023-04-012024-03-310001004315nggtf:OtherSegmentsMembernggtf:OtherProductAndServicesMember2023-04-012024-03-310001004315nggtf:OtherProductAndServicesMember2023-04-012024-03-310001004315nggtf:UKElectricityTransmissionMembernggtf:GenerationMember2023-04-012024-03-310001004315nggtf:UKElectricityDistributionMembernggtf:GenerationMember2023-04-012024-03-310001004315nggtf:UKElectricitySystemOperatorMembernggtf:GenerationMember2023-04-012024-03-310001004315nggtf:NewEnglandSegmentMembernggtf:GenerationMember2023-04-012024-03-310001004315nggtf:NewYorkSegmentMembernggtf:GenerationMember2023-04-012024-03-310001004315nggtf:NationalGridVenturesMembernggtf:GenerationMember2023-04-012024-03-310001004315nggtf:OtherSegmentsMembernggtf:GenerationMember2023-04-012024-03-310001004315nggtf:GenerationMember2023-04-012024-03-310001004315nggtf:UKElectricityTransmissionMemberifrs-full:CountryOfDomicileMember2023-04-012024-03-310001004315nggtf:UKElectricityDistributionMemberifrs-full:CountryOfDomicileMember2023-04-012024-03-310001004315nggtf:UKElectricitySystemOperatorMemberifrs-full:CountryOfDomicileMember2023-04-012024-03-310001004315nggtf:NewEnglandSegmentMemberifrs-full:CountryOfDomicileMember2023-04-012024-03-310001004315nggtf:NewYorkSegmentMemberifrs-full:CountryOfDomicileMember2023-04-012024-03-310001004315nggtf:NationalGridVenturesMemberifrs-full:CountryOfDomicileMember2023-04-012024-03-310001004315nggtf:OtherSegmentsMemberifrs-full:CountryOfDomicileMember2023-04-012024-03-310001004315nggtf:UKElectricityTransmissionMembercountry:US2023-04-012024-03-310001004315nggtf:UKElectricityDistributionMembercountry:US2023-04-012024-03-310001004315nggtf:UKElectricitySystemOperatorMembercountry:US2023-04-012024-03-310001004315nggtf:NewEnglandSegmentMembercountry:US2023-04-012024-03-310001004315nggtf:NewYorkSegmentMembercountry:US2023-04-012024-03-310001004315nggtf:NationalGridVenturesMembercountry:US2023-04-012024-03-310001004315nggtf:OtherSegmentsMembercountry:US2023-04-012024-03-310001004315nggtf:UKElectricityTransmissionMembernggtf:ConnectionsMember2025-04-012026-03-310001004315nggtf:UKElectricityDistributionMembernggtf:ConnectionsMember2025-04-012026-03-310001004315nggtf:NewEnglandSegmentMembernggtf:ConnectionsMember2025-04-012026-03-310001004315nggtf:NewYorkSegmentMembernggtf:ConnectionsMember2025-04-012026-03-310001004315ifrs-full:WeightedAverageMember2025-04-012026-03-310001004315nggtf:UKElectricityTransmissionMember2026-03-310001004315nggtf:UKElectricityTransmissionMember2025-03-310001004315nggtf:UKElectricityTransmissionMember2024-03-310001004315nggtf:NationalGridRenewablesMembernggtf:ExceptionalItemsNettingMember2025-04-012026-03-310001004315nggtf:NationalGridRenewablesMembernggtf:ExceptionalItemsNettingMember2024-04-012025-03-310001004315nggtf:NationalGridRenewablesMembernggtf:ExceptionalItemsNettingMember2023-04-012024-03-310001004315nggtf:GrainLNGMembernggtf:ExceptionalItemsNettingMember2025-04-012026-03-310001004315nggtf:GrainLNGMembernggtf:ExceptionalItemsNettingMember2024-04-012025-03-310001004315nggtf:GrainLNGMembernggtf:ExceptionalItemsNettingMember2023-04-012024-03-310001004315nggtf:ExceptionalItemsNettingMember2025-04-012026-03-310001004315nggtf:ExceptionalItemsNettingMember2024-04-012025-03-310001004315nggtf:ExceptionalItemsNettingMember2023-04-012024-03-310001004315nggtf:UKElectricitySystemOperatorMembernggtf:ExceptionalItemsNettingMember2025-04-012026-03-310001004315nggtf:UKElectricitySystemOperatorMembernggtf:ExceptionalItemsNettingMember2024-04-012025-03-310001004315nggtf:UKElectricitySystemOperatorMembernggtf:ExceptionalItemsNettingMember2023-04-012024-03-310001004315nggtf:CommodityDerivativesMembernggtf:RemeasurementsNettingMember2025-04-012026-03-310001004315nggtf:CommodityDerivativesMembernggtf:RemeasurementsNettingMember2024-04-012025-03-310001004315nggtf:CommodityDerivativesMembernggtf:RemeasurementsNettingMember2023-04-012024-03-310001004315nggtf:RemeasurementsNettingMember2025-04-012026-03-310001004315nggtf:RemeasurementsNettingMember2024-04-012025-03-310001004315nggtf:RemeasurementsNettingMember2023-04-012024-03-310001004315ifrs-full:AssetsAndLiabilitiesClassifiedAsHeldForSaleMembernggtf:NationalGridRenewablesMembernggtf:ExceptionalItemsNettingMember2025-04-012026-03-310001004315nggtf:NationalGridRenewablesMemberifrs-full:AssetsAndLiabilitiesClassifiedAsHeldForSaleMember2025-05-292025-05-290001004315ifrs-full:AssetsAndLiabilitiesClassifiedAsHeldForSaleMembernggtf:GrainLNGMembernggtf:ExceptionalItemsNettingMember2025-04-012026-03-310001004315nggtf:GrainLNGMemberifrs-full:AssetsAndLiabilitiesClassifiedAsHeldForSaleMember2025-11-282025-11-280001004315nggtf:ExceptionalItemsNettingMemberifrs-full:OtherEnvironmentRelatedProvisionMember2024-04-012025-03-310001004315ifrs-full:OtherEnvironmentRelatedProvisionMember2024-04-012025-03-310001004315country:USnggtf:ExceptionalItemsNettingMemberifrs-full:OtherEnvironmentRelatedProvisionMember2024-04-012025-03-310001004315nggtf:UKElectricitySystemOperatorMember2024-04-012025-03-310001004315nggtf:UKElectricitySystemOperatorMemberifrs-full:AssetsAndLiabilitiesClassifiedAsHeldForSaleMember2025-03-310001004315nggtf:UKElectricitySystemOperatorMemberifrs-full:AssetsAndLiabilitiesClassifiedAsHeldForSaleMember2024-10-010001004315ifrs-full:JointVenturesMember2024-04-012025-03-310001004315nggtf:ExceptionalItemsNettingMembernggtf:NationalGridRenewablesMember2024-04-012025-03-310001004315nggtf:ExceptionalItemsNettingMembernggtf:GrainLNGMember2024-04-012025-03-310001004315nggtf:ExceptionalItemsNettingMembernggtf:MajorTransformationProgrammeMember2024-04-012025-03-310001004315nggtf:ExceptionalItemsNettingMembernggtf:TheNarragansettElectricCompanyMember2023-04-012024-03-310001004315nggtf:ExceptionalItemsNettingMembernggtf:UKGasTransmissionMember2023-04-012024-03-310001004315nggtf:ExceptionalItemsNettingMembernggtf:NationalGridElectricityDistributionGroupMember2023-04-012024-03-310001004315nggtf:ExceptionalItemsNettingMember2021-04-012024-03-3100010043152021-11-012021-11-300001004315nggtf:ExceptionalItemsNettingMember2021-11-012024-03-310001004315nggtf:DomesticTaxAuthorityMember2025-04-012026-03-310001004315nggtf:DomesticTaxAuthorityMember2024-04-012025-03-310001004315nggtf:DomesticTaxAuthorityMember2023-04-012024-03-310001004315nggtf:ForeignTaxAuthorityMember2025-04-012026-03-310001004315nggtf:ForeignTaxAuthorityMember2024-04-012025-03-310001004315nggtf:ForeignTaxAuthorityMember2023-04-012024-03-310001004315nggtf:RegulatoryLicensesMember2024-03-310001004315nggtf:AcceleratedTaxDepreciationRelatedTemporaryDifferencesMember2024-03-310001004315nggtf:ShareBasedPaymentsRelatedTemporaryDifferencesMember2024-03-310001004315nggtf:PensionsAndOtherPostRetirementBenefitsRelatedTemporaryDifferencesMember2024-03-310001004315nggtf:FinancialInstrumentsRelatedTemporaryDifferencesMember2024-03-310001004315ifrs-full:OtherTemporaryDifferencesMember2024-03-310001004315nggtf:RegulatoryLicensesMember2024-04-012025-03-310001004315nggtf:AcceleratedTaxDepreciationRelatedTemporaryDifferencesMember2024-04-012025-03-310001004315nggtf:ShareBasedPaymentsRelatedTemporaryDifferencesMember2024-04-012025-03-310001004315nggtf:PensionsAndOtherPostRetirementBenefitsRelatedTemporaryDifferencesMember2024-04-012025-03-310001004315nggtf:FinancialInstrumentsRelatedTemporaryDifferencesMember2024-04-012025-03-310001004315ifrs-full:OtherTemporaryDifferencesMember2024-04-012025-03-310001004315nggtf:RegulatoryLicensesMember2025-03-310001004315nggtf:AcceleratedTaxDepreciationRelatedTemporaryDifferencesMember2025-03-310001004315nggtf:ShareBasedPaymentsRelatedTemporaryDifferencesMember2025-03-310001004315nggtf:PensionsAndOtherPostRetirementBenefitsRelatedTemporaryDifferencesMember2025-03-310001004315nggtf:FinancialInstrumentsRelatedTemporaryDifferencesMember2025-03-310001004315ifrs-full:OtherTemporaryDifferencesMember2025-03-310001004315nggtf:RegulatoryLicensesMember2025-04-012026-03-310001004315nggtf:AcceleratedTaxDepreciationRelatedTemporaryDifferencesMember2025-04-012026-03-310001004315nggtf:ShareBasedPaymentsRelatedTemporaryDifferencesMember2025-04-012026-03-310001004315nggtf:PensionsAndOtherPostRetirementBenefitsRelatedTemporaryDifferencesMember2025-04-012026-03-310001004315nggtf:FinancialInstrumentsRelatedTemporaryDifferencesMember2025-04-012026-03-310001004315ifrs-full:OtherTemporaryDifferencesMember2025-04-012026-03-310001004315nggtf:RegulatoryLicensesMember2026-03-310001004315nggtf:AcceleratedTaxDepreciationRelatedTemporaryDifferencesMember2026-03-310001004315nggtf:ShareBasedPaymentsRelatedTemporaryDifferencesMember2026-03-310001004315nggtf:PensionsAndOtherPostRetirementBenefitsRelatedTemporaryDifferencesMember2026-03-310001004315nggtf:FinancialInstrumentsRelatedTemporaryDifferencesMember2026-03-310001004315ifrs-full:OtherTemporaryDifferencesMember2026-03-310001004315ifrs-full:UnusedTaxLossesMember2026-03-310001004315ifrs-full:UnusedTaxLossesMember2025-03-310001004315nggtf:TemporaryDifferencesLeaseLiabilitiesMember2026-03-310001004315nggtf:TemporaryDifferencesLeaseLiabilitiesMember2025-03-310001004315nggtf:TemporaryDifferencesEnvironmentalProvisionsMember2026-03-310001004315nggtf:TemporaryDifferencesEnvironmentalProvisionsMember2025-03-310001004315ifrs-full:AllowanceForCreditLossesMember2026-03-310001004315ifrs-full:AllowanceForCreditLossesMember2025-03-310001004315nggtf:TemporaryDifferencesOtherShortTermDifferencesMember2026-03-310001004315nggtf:TemporaryDifferencesOtherShortTermDifferencesMember2025-03-310001004315nggtf:CapitalLossesMember2026-03-310001004315nggtf:CapitalLossesMember2025-03-310001004315nggtf:TradingLossesMember2026-03-310001004315nggtf:TradingLossesMember2025-03-310001004315nggtf:FinalDividendInRespectOfPriorYearMember2025-04-012026-03-310001004315nggtf:FinalDividendInRespectOfPriorYearMember2024-04-012025-03-310001004315nggtf:FinalDividendInRespectOfPriorYearMember2023-04-012024-03-310001004315nggtf:InterimDividendInRespectOfCurrentYearMember2025-04-012026-03-310001004315nggtf:InterimDividendInRespectOfCurrentYearMember2024-04-012025-03-310001004315nggtf:InterimDividendInRespectOfCurrentYearMember2023-04-012024-03-310001004315nggtf:NationalGridRenewablesMemberifrs-full:DisposalGroupsClassifiedAsHeldForSaleMember2025-05-292025-05-290001004315nggtf:NationalGridRenewablesMemberifrs-full:AssetsAndLiabilitiesClassifiedAsHeldForSaleMember2025-05-290001004315nggtf:NationalGridRenewablesMember2025-04-012025-05-290001004315nggtf:NationalGridRenewablesMember2024-04-012025-03-310001004315nggtf:NationalGridRenewablesMember2023-04-012024-03-310001004315nggtf:GrainLNGMember2026-03-310001004315nggtf:GrainLNGMemberifrs-full:AssetsAndLiabilitiesClassifiedAsHeldForSaleMember2025-11-280001004315nggtf:GrainLNGMember2025-04-012025-11-280001004315nggtf:GrainLNGMember2024-04-012025-03-310001004315nggtf:GrainLNGMember2023-04-012024-03-310001004315nggtf:UKGasTransmissionMember2024-07-012024-07-310001004315nggtf:GasTTopCoLimitedMember2024-07-012024-07-310001004315ifrs-full:DiscontinuedOperationsMember2024-04-012025-03-310001004315ifrs-full:DiscontinuedOperationsMember2023-04-012024-03-310001004315ifrs-full:AccumulatedImpairmentMemberifrs-full:GoodwillMember2026-03-310001004315ifrs-full:AccumulatedImpairmentMemberifrs-full:GoodwillMember2025-03-310001004315nggtf:NationalGridVenturesUSMember2026-03-310001004315nggtf:NationalGridVenturesUSMember2025-03-310001004315nggtf:NewEnglandSegmentMember2026-03-310001004315nggtf:NewEnglandSegmentMember2025-03-310001004315nggtf:NewYorkCGUMember2026-03-310001004315nggtf:NewYorkCGUMember2025-03-310001004315nggtf:UKElectricityDistributionMember2026-03-310001004315nggtf:UKElectricityDistributionMember2025-03-310001004315nggtf:WestMidlandsMemberifrs-full:LicencesMember2026-03-310001004315nggtf:WestMidlandsMemberifrs-full:LicencesMember2025-03-310001004315nggtf:EastMidlandsMemberifrs-full:LicencesMember2026-03-310001004315nggtf:EastMidlandsMemberifrs-full:LicencesMember2025-03-310001004315nggtf:SouthWalesMemberifrs-full:LicencesMember2026-03-310001004315nggtf:SouthWalesMemberifrs-full:LicencesMember2025-03-310001004315nggtf:SouthWestMemberifrs-full:LicencesMember2026-03-310001004315nggtf:SouthWestMemberifrs-full:LicencesMember2025-03-310001004315ifrs-full:LicencesMember2026-03-310001004315ifrs-full:LicencesMember2025-03-310001004315nggtf:USRegulatedMember2026-03-310001004315nggtf:USRegulatedMember2025-03-310001004315nggtf:UKElectricityDistributionGroupMember2026-03-310001004315nggtf:UKElectricityDistributionGroupMember2025-03-310001004315nggtf:UKElectricityDistributionDNOsMember2026-03-310001004315nggtf:UKElectricityDistributionDNOsMember2025-03-310001004315ifrs-full:GrossCarryingAmountMemberifrs-full:LicencesMember2024-03-310001004315ifrs-full:GrossCarryingAmountMemberifrs-full:ComputerSoftwareMember2024-03-310001004315ifrs-full:GrossCarryingAmountMemberifrs-full:ConstructionInProgressMember2024-03-310001004315ifrs-full:GrossCarryingAmountMember2024-03-310001004315ifrs-full:GrossCarryingAmountMemberifrs-full:LicencesMember2024-04-012025-03-310001004315ifrs-full:GrossCarryingAmountMemberifrs-full:ComputerSoftwareMember2024-04-012025-03-310001004315ifrs-full:GrossCarryingAmountMemberifrs-full:ConstructionInProgressMember2024-04-012025-03-310001004315ifrs-full:GrossCarryingAmountMember2024-04-012025-03-310001004315ifrs-full:GrossCarryingAmountMemberifrs-full:LicencesMember2025-03-310001004315ifrs-full:GrossCarryingAmountMemberifrs-full:ComputerSoftwareMember2025-03-310001004315ifrs-full:GrossCarryingAmountMemberifrs-full:ConstructionInProgressMember2025-03-310001004315ifrs-full:GrossCarryingAmountMember2025-03-310001004315ifrs-full:GrossCarryingAmountMemberifrs-full:LicencesMember2025-04-012026-03-310001004315ifrs-full:GrossCarryingAmountMemberifrs-full:ComputerSoftwareMember2025-04-012026-03-310001004315ifrs-full:GrossCarryingAmountMemberifrs-full:ConstructionInProgressMember2025-04-012026-03-310001004315ifrs-full:GrossCarryingAmountMember2025-04-012026-03-310001004315ifrs-full:GrossCarryingAmountMemberifrs-full:LicencesMember2026-03-310001004315ifrs-full:GrossCarryingAmountMemberifrs-full:ComputerSoftwareMember2026-03-310001004315ifrs-full:GrossCarryingAmountMemberifrs-full:ConstructionInProgressMember2026-03-310001004315ifrs-full:GrossCarryingAmountMember2026-03-310001004315ifrs-full:AccumulatedDepreciationAndAmortisationMemberifrs-full:LicencesMember2024-03-310001004315ifrs-full:AccumulatedDepreciationAndAmortisationMemberifrs-full:ComputerSoftwareMember2024-03-310001004315ifrs-full:AccumulatedDepreciationAndAmortisationMemberifrs-full:ConstructionInProgressMember2024-03-310001004315ifrs-full:AccumulatedDepreciationAndAmortisationMember2024-03-310001004315ifrs-full:AccumulatedDepreciationAndAmortisationMemberifrs-full:LicencesMember2024-04-012025-03-310001004315ifrs-full:AccumulatedDepreciationAndAmortisationMemberifrs-full:ComputerSoftwareMember2024-04-012025-03-310001004315ifrs-full:AccumulatedDepreciationAndAmortisationMemberifrs-full:ConstructionInProgressMember2024-04-012025-03-310001004315ifrs-full:AccumulatedDepreciationAndAmortisationMember2024-04-012025-03-310001004315ifrs-full:AccumulatedDepreciationAndAmortisationMemberifrs-full:LicencesMember2025-03-310001004315ifrs-full:AccumulatedDepreciationAndAmortisationMemberifrs-full:ComputerSoftwareMember2025-03-310001004315ifrs-full:AccumulatedDepreciationAndAmortisationMemberifrs-full:ConstructionInProgressMember2025-03-310001004315ifrs-full:AccumulatedDepreciationAndAmortisationMember2025-03-310001004315ifrs-full:AccumulatedDepreciationAndAmortisationMemberifrs-full:LicencesMember2025-04-012026-03-310001004315ifrs-full:AccumulatedDepreciationAndAmortisationMemberifrs-full:ComputerSoftwareMember2025-04-012026-03-310001004315ifrs-full:AccumulatedDepreciationAndAmortisationMemberifrs-full:ConstructionInProgressMember2025-04-012026-03-310001004315ifrs-full:AccumulatedDepreciationAndAmortisationMember2025-04-012026-03-310001004315ifrs-full:AccumulatedDepreciationAndAmortisationMemberifrs-full:LicencesMember2026-03-310001004315ifrs-full:AccumulatedDepreciationAndAmortisationMemberifrs-full:ComputerSoftwareMember2026-03-310001004315ifrs-full:AccumulatedDepreciationAndAmortisationMemberifrs-full:ConstructionInProgressMember2026-03-310001004315ifrs-full:AccumulatedDepreciationAndAmortisationMember2026-03-310001004315ifrs-full:ComputerSoftwareMember2026-03-310001004315ifrs-full:ConstructionInProgressMember2026-03-310001004315ifrs-full:ComputerSoftwareMember2025-03-310001004315ifrs-full:ConstructionInProgressMember2025-03-310001004315nggtf:GasBusinessEnablementSystemMember2026-03-310001004315nggtf:GasBusinessEnablementSystemMember2025-03-310001004315nggtf:GasBusinessEnablementSystemMember2025-04-012026-03-310001004315nggtf:UKGeneralLedgerSystemMember2026-03-310001004315nggtf:UKGeneralLedgerSystemMember2025-03-310001004315nggtf:UKGeneralLedgerSystemMember2025-04-012026-03-310001004315ifrs-full:ComputerSoftwareMemberifrs-full:BottomOfRangeMember2025-04-012026-03-310001004315ifrs-full:ComputerSoftwareMemberifrs-full:TopOfRangeMember2025-04-012026-03-310001004315ifrs-full:LandAndBuildingsMemberifrs-full:GrossCarryingAmountMember2024-03-310001004315ifrs-full:MachineryMemberifrs-full:GrossCarryingAmountMember2024-03-310001004315ifrs-full:ConstructionInProgressMemberifrs-full:GrossCarryingAmountMember2024-03-310001004315nggtf:MotorVehiclesAndOfficeEquipmentMemberifrs-full:GrossCarryingAmountMember2024-03-310001004315ifrs-full:LandAndBuildingsMemberifrs-full:GrossCarryingAmountMember2024-04-012025-03-310001004315ifrs-full:MachineryMemberifrs-full:GrossCarryingAmountMember2024-04-012025-03-310001004315ifrs-full:ConstructionInProgressMemberifrs-full:GrossCarryingAmountMember2024-04-012025-03-310001004315nggtf:MotorVehiclesAndOfficeEquipmentMemberifrs-full:GrossCarryingAmountMember2024-04-012025-03-310001004315ifrs-full:LandAndBuildingsMemberifrs-full:GrossCarryingAmountMember2025-03-310001004315ifrs-full:MachineryMemberifrs-full:GrossCarryingAmountMember2025-03-310001004315ifrs-full:ConstructionInProgressMemberifrs-full:GrossCarryingAmountMember2025-03-310001004315nggtf:MotorVehiclesAndOfficeEquipmentMemberifrs-full:GrossCarryingAmountMember2025-03-310001004315ifrs-full:LandAndBuildingsMemberifrs-full:GrossCarryingAmountMember2025-04-012026-03-310001004315ifrs-full:MachineryMemberifrs-full:GrossCarryingAmountMember2025-04-012026-03-310001004315ifrs-full:ConstructionInProgressMemberifrs-full:GrossCarryingAmountMember2025-04-012026-03-310001004315nggtf:MotorVehiclesAndOfficeEquipmentMemberifrs-full:GrossCarryingAmountMember2025-04-012026-03-310001004315ifrs-full:LandAndBuildingsMemberifrs-full:GrossCarryingAmountMember2026-03-310001004315ifrs-full:MachineryMemberifrs-full:GrossCarryingAmountMember2026-03-310001004315ifrs-full:ConstructionInProgressMemberifrs-full:GrossCarryingAmountMember2026-03-310001004315nggtf:MotorVehiclesAndOfficeEquipmentMemberifrs-full:GrossCarryingAmountMember2026-03-310001004315ifrs-full:LandAndBuildingsMemberifrs-full:AccumulatedDepreciationAndAmortisationMember2024-03-310001004315ifrs-full:MachineryMemberifrs-full:AccumulatedDepreciationAndAmortisationMember2024-03-310001004315ifrs-full:ConstructionInProgressMemberifrs-full:AccumulatedDepreciationAndAmortisationMember2024-03-310001004315nggtf:MotorVehiclesAndOfficeEquipmentMemberifrs-full:AccumulatedDepreciationAndAmortisationMember2024-03-310001004315ifrs-full:LandAndBuildingsMemberifrs-full:AccumulatedDepreciationAndAmortisationMember2024-04-012025-03-310001004315ifrs-full:MachineryMemberifrs-full:AccumulatedDepreciationAndAmortisationMember2024-04-012025-03-310001004315ifrs-full:ConstructionInProgressMemberifrs-full:AccumulatedDepreciationAndAmortisationMember2024-04-012025-03-310001004315nggtf:MotorVehiclesAndOfficeEquipmentMemberifrs-full:AccumulatedDepreciationAndAmortisationMember2024-04-012025-03-310001004315ifrs-full:LandAndBuildingsMemberifrs-full:AccumulatedDepreciationAndAmortisationMember2025-03-310001004315ifrs-full:MachineryMemberifrs-full:AccumulatedDepreciationAndAmortisationMember2025-03-310001004315ifrs-full:ConstructionInProgressMemberifrs-full:AccumulatedDepreciationAndAmortisationMember2025-03-310001004315nggtf:MotorVehiclesAndOfficeEquipmentMemberifrs-full:AccumulatedDepreciationAndAmortisationMember2025-03-310001004315ifrs-full:LandAndBuildingsMemberifrs-full:AccumulatedDepreciationAndAmortisationMember2025-04-012026-03-310001004315ifrs-full:MachineryMemberifrs-full:AccumulatedDepreciationAndAmortisationMember2025-04-012026-03-310001004315ifrs-full:ConstructionInProgressMemberifrs-full:AccumulatedDepreciationAndAmortisationMember2025-04-012026-03-310001004315nggtf:MotorVehiclesAndOfficeEquipmentMemberifrs-full:AccumulatedDepreciationAndAmortisationMember2025-04-012026-03-310001004315ifrs-full:LandAndBuildingsMemberifrs-full:AccumulatedDepreciationAndAmortisationMember2026-03-310001004315ifrs-full:MachineryMemberifrs-full:AccumulatedDepreciationAndAmortisationMember2026-03-310001004315ifrs-full:ConstructionInProgressMemberifrs-full:AccumulatedDepreciationAndAmortisationMember2026-03-310001004315nggtf:MotorVehiclesAndOfficeEquipmentMemberifrs-full:AccumulatedDepreciationAndAmortisationMember2026-03-310001004315ifrs-full:LandAndBuildingsMember2026-03-310001004315ifrs-full:MachineryMember2026-03-310001004315ifrs-full:ConstructionInProgressMember2026-03-310001004315nggtf:MotorVehiclesAndOfficeEquipmentMember2026-03-310001004315ifrs-full:LandAndBuildingsMember2025-03-310001004315ifrs-full:MachineryMember2025-03-310001004315ifrs-full:ConstructionInProgressMember2025-03-310001004315nggtf:MotorVehiclesAndOfficeEquipmentMember2025-03-310001004315country:GBifrs-full:LandAndBuildingsMemberifrs-full:TopOfRangeMember2025-04-012026-03-310001004315country:USifrs-full:LandAndBuildingsMemberifrs-full:TopOfRangeMember2025-04-012026-03-310001004315ifrs-full:LandAndBuildingsMemberifrs-full:WeightedAverageMember2025-04-012026-03-310001004315country:GBnggtf:ElectricityTransmissionPlantAndWiresMemberifrs-full:TopOfRangeMember2025-04-012026-03-310001004315country:USnggtf:ElectricityTransmissionPlantAndWiresMemberifrs-full:BottomOfRangeMember2025-04-012026-03-310001004315country:USnggtf:ElectricityTransmissionPlantAndWiresMemberifrs-full:TopOfRangeMember2025-04-012026-03-310001004315nggtf:ElectricityTransmissionPlantAndWiresMemberifrs-full:WeightedAverageMember2025-04-012026-03-310001004315country:GBnggtf:ElectricityDistributionPlantMemberifrs-full:BottomOfRangeMember2025-04-012026-03-310001004315country:GBnggtf:ElectricityDistributionPlantMemberifrs-full:TopOfRangeMember2025-04-012026-03-310001004315country:USnggtf:ElectricityDistributionPlantMemberifrs-full:BottomOfRangeMember2025-04-012026-03-310001004315country:USnggtf:ElectricityDistributionPlantMemberifrs-full:TopOfRangeMember2025-04-012026-03-310001004315nggtf:ElectricityDistributionPlantMemberifrs-full:WeightedAverageMember2025-04-012026-03-310001004315country:USnggtf:ElectricityGenerationPlantMemberifrs-full:BottomOfRangeMember2025-04-012026-03-310001004315country:USnggtf:ElectricityGenerationPlantMemberifrs-full:TopOfRangeMember2025-04-012026-03-310001004315nggtf:ElectricityGenerationPlantMemberifrs-full:WeightedAverageMember2025-04-012026-03-310001004315country:GBnggtf:InterconnectorPlantAndOtherMemberifrs-full:BottomOfRangeMember2025-04-012026-03-310001004315country:GBnggtf:InterconnectorPlantAndOtherMemberifrs-full:TopOfRangeMember2025-04-012026-03-310001004315country:USnggtf:InterconnectorPlantAndOtherMemberifrs-full:BottomOfRangeMember2025-04-012026-03-310001004315country:USnggtf:InterconnectorPlantAndOtherMemberifrs-full:TopOfRangeMember2025-04-012026-03-310001004315nggtf:InterconnectorPlantAndOtherMemberifrs-full:WeightedAverageMember2025-04-012026-03-310001004315country:USnggtf:GasPlantMainsServicesAndRegulatingEquipmentMemberifrs-full:BottomOfRangeMember2025-04-012026-03-310001004315country:USnggtf:GasPlantMainsServicesAndRegulatingEquipmentMemberifrs-full:TopOfRangeMember2025-04-012026-03-310001004315nggtf:GasPlantMainsServicesAndRegulatingEquipmentMemberifrs-full:WeightedAverageMember2025-04-012026-03-310001004315country:USnggtf:GasPlantStorageMemberifrs-full:BottomOfRangeMember2025-04-012026-03-310001004315country:USnggtf:GasPlantStorageMemberifrs-full:TopOfRangeMember2025-04-012026-03-310001004315nggtf:GasPlantStorageMemberifrs-full:WeightedAverageMember2025-04-012026-03-310001004315country:USnggtf:GasPlantMetersMemberifrs-full:BottomOfRangeMember2025-04-012026-03-310001004315country:USnggtf:GasPlantMetersMemberifrs-full:TopOfRangeMember2025-04-012026-03-310001004315nggtf:GasPlantMetersMemberifrs-full:WeightedAverageMember2025-04-012026-03-310001004315country:GBnggtf:MotorVehiclesAndOfficeEquipmentMemberifrs-full:TopOfRangeMember2025-04-012026-03-310001004315country:USnggtf:MotorVehiclesAndOfficeEquipmentMemberifrs-full:TopOfRangeMember2025-04-012026-03-310001004315nggtf:MotorVehiclesAndOfficeEquipmentMemberifrs-full:WeightedAverageMember2025-04-012026-03-310001004315country:USnggtf:GasDistributionAssetsMemberifrs-full:WeightedAverageMember2025-04-012026-03-310001004315ifrs-full:LandAndBuildingsMember2024-03-310001004315ifrs-full:MachineryMember2024-03-310001004315ifrs-full:ConstructionInProgressMember2024-03-310001004315nggtf:MotorVehiclesAndOfficeEquipmentMember2024-03-310001004315ifrs-full:LandAndBuildingsMember2024-04-012025-03-310001004315ifrs-full:MachineryMember2024-04-012025-03-310001004315ifrs-full:ConstructionInProgressMember2024-04-012025-03-310001004315nggtf:MotorVehiclesAndOfficeEquipmentMember2024-04-012025-03-310001004315ifrs-full:LandAndBuildingsMember2025-04-012026-03-310001004315ifrs-full:MachineryMember2025-04-012026-03-310001004315ifrs-full:ConstructionInProgressMember2025-04-012026-03-310001004315nggtf:MotorVehiclesAndOfficeEquipmentMember2025-04-012026-03-310001004315nggtf:InvestmentsShortTermMoneyMarketFundsMember2026-03-310001004315nggtf:InvestmentsShortTermMoneyMarketFundsMember2025-03-310001004315nggtf:InvestmentsCorporateCapitalVenturesAndOtherMember2026-03-310001004315nggtf:InvestmentsCorporateCapitalVenturesAndOtherMember2025-03-310001004315nggtf:UnquotedEquityInvestmentsMember2026-03-310001004315nggtf:UnquotedEquityInvestmentsMember2025-03-310001004315nggtf:RestrictedBalancesCollateralMember2026-03-310001004315nggtf:RestrictedBalancesCollateralMember2025-03-310001004315nggtf:RestrictedBalancesInsuranceCompanyAndNonQualifiedPlanInvestmentsMember2026-03-310001004315nggtf:RestrictedBalancesInsuranceCompanyAndNonQualifiedPlanInvestmentsMember2025-03-310001004315nggtf:RestrictedBalancesCashSurrenderValueOfLifeInsurancePoliciesMember2026-03-310001004315nggtf:RestrictedBalancesCashSurrenderValueOfLifeInsurancePoliciesMember2025-03-310001004315nggtf:RestrictedBalancesOtherInvestmentsMember2026-03-310001004315nggtf:RestrictedBalancesOtherInvestmentsMember2025-03-310001004315nggtf:InvestmentsInsuranceCompanyFundMember2026-03-310001004315nggtf:InvestmentsInsuranceCompanyFundMember2025-03-310001004315nggtf:InvestmentsSpecificProjectMember2026-03-310001004315nggtf:InvestmentsSpecificProjectMember2025-03-310001004315nggtf:InvestmentsLetterOfCreditMember2026-03-310001004315nggtf:InvestmentsLetterOfCreditMember2025-03-310001004315ifrs-full:AssociatesMember2025-03-310001004315ifrs-full:JointVenturesMember2025-03-310001004315ifrs-full:AssociatesMember2024-03-310001004315ifrs-full:JointVenturesMember2024-03-310001004315ifrs-full:AssociatesMember2025-04-012026-03-310001004315ifrs-full:JointVenturesMember2025-04-012026-03-310001004315ifrs-full:AssociatesMember2024-04-012025-03-310001004315ifrs-full:AssociatesMember2026-03-310001004315ifrs-full:JointVenturesMember2026-03-310001004315nggtf:JointVenturesAndAssociatesMember2026-03-310001004315nggtf:JointVenturesAndAssociatesMember2025-03-310001004315nggtf:BritNedDevelopmentLimitedMember2025-04-012026-03-310001004315nggtf:NemoLinkLimitedMember2025-04-012026-03-310001004315nggtf:EmeraldEnergyVentureLLCMember2024-04-012025-03-310001004315nggtf:BritNedDevelopmentLimitedMember2026-03-310001004315nggtf:BritNedDevelopmentLimitedMember2025-03-310001004315nggtf:NemoLinkLimitedMember2026-03-310001004315nggtf:NemoLinkLimitedMember2025-03-310001004315nggtf:BritNedDevelopmentLimitedMember2024-04-012025-03-310001004315nggtf:NemoLinkLimitedMember2024-04-012025-03-310001004315nggtf:AggregatedIndividuallyImmaterialAssociatesAndJointVenturesMember2025-04-012026-03-310001004315nggtf:AggregatedIndividuallyImmaterialAssociatesAndJointVenturesMember2024-04-012025-03-310001004315nggtf:AggregatedIndividuallyImmaterialAssociatesAndJointVenturesMember2026-03-310001004315nggtf:AggregatedIndividuallyImmaterialAssociatesAndJointVenturesMember2025-03-310001004315nggtf:CurrentDerivativeMember2026-03-310001004315nggtf:CurrentDerivativeMember2025-03-310001004315nggtf:NonCurrentDerivativeMember2026-03-310001004315nggtf:NonCurrentDerivativeMember2025-03-310001004315nggtf:FinancingDerivativesMember2026-03-310001004315nggtf:FinancingDerivativesMember2025-03-310001004315nggtf:CommodityDerivativesMember2026-03-310001004315nggtf:CommodityDerivativesMember2025-03-310001004315nggtf:FinancingDerivativesInterestRateSwapsMember2026-03-310001004315nggtf:FinancingDerivativesInterestRateSwapsMember2025-03-310001004315nggtf:FinancingDerivativesCrossCurrencyInterestRateSwapsMember2026-03-310001004315nggtf:FinancingDerivativesCrossCurrencyInterestRateSwapsMember2025-03-310001004315nggtf:FinancingDerivativesForeignExchangeForwardContractsMember2026-03-310001004315nggtf:FinancingDerivativesForeignExchangeForwardContractsMember2025-03-310001004315nggtf:FinancingDerivativesInflationLinkedSwapsMember2026-03-310001004315nggtf:FinancingDerivativesInflationLinkedSwapsMember2025-03-310001004315nggtf:FinancingDerivativesForeignExchangeForwardContractsMembernggtf:CapitalExpendituresMember2026-03-310001004315nggtf:FinancingDerivativesForeignExchangeForwardContractsMembernggtf:CapitalExpendituresMember2025-03-310001004315nggtf:FinancingDerivativesMemberifrs-full:NotLaterThanOneYearMember2026-03-310001004315nggtf:FinancingDerivativesMemberifrs-full:NotLaterThanOneYearMember2025-03-310001004315nggtf:FinancingDerivativesMemberifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMember2026-03-310001004315nggtf:FinancingDerivativesMemberifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMember2025-03-310001004315nggtf:FinancingDerivativesMemberifrs-full:LaterThanTwoYearsAndNotLaterThanThreeYearsMember2026-03-310001004315nggtf:FinancingDerivativesMemberifrs-full:LaterThanTwoYearsAndNotLaterThanThreeYearsMember2025-03-310001004315nggtf:FinancingDerivativesMemberifrs-full:LaterThanThreeYearsAndNotLaterThanFourYearsMember2026-03-310001004315nggtf:FinancingDerivativesMemberifrs-full:LaterThanThreeYearsAndNotLaterThanFourYearsMember2025-03-310001004315nggtf:FinancingDerivativesMemberifrs-full:LaterThanFourYearsAndNotLaterThanFiveYearsMember2026-03-310001004315nggtf:FinancingDerivativesMemberifrs-full:LaterThanFourYearsAndNotLaterThanFiveYearsMember2025-03-310001004315nggtf:FinancingDerivativesMemberifrs-full:LaterThanFiveYearsMember2026-03-310001004315nggtf:FinancingDerivativesMemberifrs-full:LaterThanFiveYearsMember2025-03-310001004315nggtf:FinancingDerivativesMemberifrs-full:LaterThanOneYearMember2026-03-310001004315nggtf:FinancingDerivativesMemberifrs-full:LaterThanOneYearMember2025-03-310001004315nggtf:CommodityDerivativesForwardPurchasesGasMember2026-03-310001004315nggtf:CommodityDerivativesForwardPurchasesGasMember2025-03-310001004315nggtf:CommodityDerivativesPurchaseContractsGasOptionsMember2026-03-310001004315nggtf:CommodityDerivativesPurchaseContractsGasOptionsMember2025-03-310001004315nggtf:CommodityDerivativesElectricityCapacityMember2026-03-310001004315nggtf:CommodityDerivativesElectricityCapacityMember2025-03-310001004315nggtf:CommodityDerivativesElectricitySwapsMember2026-03-310001004315nggtf:CommodityDerivativesElectricitySwapsMember2025-03-310001004315nggtf:CommodityDerivativesElectricityOptionsMember2026-03-310001004315nggtf:CommodityDerivativesElectricityOptionsMember2025-03-310001004315nggtf:CommodityDerivativesGasSwapsMember2026-03-310001004315nggtf:CommodityDerivativesGasSwapsMember2025-03-310001004315nggtf:CommodityDerivativesGasOptionsMember2026-03-310001004315nggtf:CommodityDerivativesGasOptionsMember2025-03-310001004315nggtf:CommodityDerivativesMemberifrs-full:NotLaterThanOneYearMember2026-03-310001004315nggtf:CommodityDerivativesMemberifrs-full:NotLaterThanOneYearMember2025-03-310001004315nggtf:CommodityDerivativesMemberifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMember2026-03-310001004315nggtf:CommodityDerivativesMemberifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMember2025-03-310001004315nggtf:CommodityDerivativesMemberifrs-full:LaterThanTwoYearsAndNotLaterThanThreeYearsMember2026-03-310001004315nggtf:CommodityDerivativesMemberifrs-full:LaterThanTwoYearsAndNotLaterThanThreeYearsMember2025-03-310001004315nggtf:CommodityDerivativesMemberifrs-full:LaterThanThreeYearsAndNotLaterThanFourYearsMember2026-03-310001004315nggtf:CommodityDerivativesMemberifrs-full:LaterThanThreeYearsAndNotLaterThanFourYearsMember2025-03-310001004315nggtf:CommodityDerivativesMemberifrs-full:LaterThanFourYearsAndNotLaterThanFiveYearsMember2026-03-310001004315nggtf:CommodityDerivativesMemberifrs-full:LaterThanFourYearsAndNotLaterThanFiveYearsMember2025-03-310001004315ifrs-full:LaterThanFiveYearsMember2026-03-310001004315ifrs-full:LaterThanFiveYearsMember2025-03-310001004315nggtf:CommodityDerivativesMemberifrs-full:LaterThanOneYearMember2026-03-310001004315nggtf:CommodityDerivativesMemberifrs-full:LaterThanOneYearMember2025-03-310001004315nggtf:CommodityDerivativesForwardPurchasesGasMember2025-04-012026-03-310001004315nggtf:CommodityDerivativesForwardPurchasesGasMember2024-04-012025-03-310001004315ifrs-full:AccumulatedImpairmentMemberifrs-full:TradeReceivablesMember2025-03-310001004315ifrs-full:AccumulatedImpairmentMemberifrs-full:TradeReceivablesMember2024-03-310001004315ifrs-full:AccumulatedImpairmentMemberifrs-full:TradeReceivablesMember2025-04-012026-03-310001004315ifrs-full:AccumulatedImpairmentMemberifrs-full:TradeReceivablesMember2024-04-012025-03-310001004315ifrs-full:AccumulatedImpairmentMemberifrs-full:TradeReceivablesMember2026-03-310001004315ifrs-full:GrossCarryingAmountMemberifrs-full:TradeReceivablesMembercountry:GB2026-03-310001004315ifrs-full:GrossCarryingAmountMemberifrs-full:TradeReceivablesMembercountry:US2026-03-310001004315ifrs-full:GrossCarryingAmountMemberifrs-full:TradeReceivablesMember2026-03-310001004315ifrs-full:GrossCarryingAmountMemberifrs-full:TradeReceivablesMembercountry:GB2025-03-310001004315ifrs-full:GrossCarryingAmountMemberifrs-full:TradeReceivablesMembercountry:US2025-03-310001004315ifrs-full:GrossCarryingAmountMemberifrs-full:TradeReceivablesMember2025-03-310001004315ifrs-full:GrossCarryingAmountMembercountry:GB2026-03-310001004315ifrs-full:GrossCarryingAmountMembercountry:US2026-03-310001004315ifrs-full:GrossCarryingAmountMembercountry:GB2025-03-310001004315ifrs-full:GrossCarryingAmountMembercountry:US2025-03-310001004315ifrs-full:AccumulatedImpairmentMemberifrs-full:TradeReceivablesMembercountry:GB2026-03-310001004315ifrs-full:AccumulatedImpairmentMemberifrs-full:TradeReceivablesMembercountry:US2026-03-310001004315ifrs-full:AccumulatedImpairmentMemberifrs-full:TradeReceivablesMembercountry:GB2025-03-310001004315ifrs-full:AccumulatedImpairmentMemberifrs-full:TradeReceivablesMembercountry:US2025-03-310001004315country:GB2026-03-310001004315country:GB2025-03-310001004315nggtf:RetailCustomerReceivablesMember2026-03-310001004315nggtf:RetailCustomerReceivablesMember2025-03-310001004315ifrs-full:AccumulatedImpairmentMemberifrs-full:TradeReceivablesMembernggtf:BeforeExceptionalItemsAndRemeasurementsNettingMember2025-04-012026-03-310001004315ifrs-full:AccumulatedImpairmentMemberifrs-full:TradeReceivablesMembernggtf:BeforeExceptionalItemsAndRemeasurementsNettingMember2024-04-012025-03-310001004315nggtf:UnbilledRevenueMember2026-03-310001004315nggtf:UnbilledRevenueMember2025-03-310001004315nggtf:RetailCustomerReceivablesMemberifrs-full:CurrentMember2026-03-310001004315nggtf:RetailCustomerReceivablesMemberifrs-full:CurrentMember2025-03-310001004315nggtf:RetailCustomerReceivablesMemberifrs-full:LaterThanOneMonthAndNotLaterThanTwoMonthsMember2026-03-310001004315nggtf:RetailCustomerReceivablesMemberifrs-full:LaterThanOneMonthAndNotLaterThanTwoMonthsMember2025-03-310001004315nggtf:RetailCustomerReceivablesMemberifrs-full:LaterThanTwoMonthsAndNotLaterThanThreeMonthsMember2026-03-310001004315nggtf:RetailCustomerReceivablesMemberifrs-full:LaterThanTwoMonthsAndNotLaterThanThreeMonthsMember2025-03-310001004315nggtf:RetailCustomerReceivablesMemberifrs-full:LaterThanThreeMonthsAndNotLaterThanSixMonthsMember2026-03-310001004315nggtf:RetailCustomerReceivablesMemberifrs-full:LaterThanThreeMonthsAndNotLaterThanSixMonthsMember2025-03-310001004315nggtf:RetailCustomerReceivablesMemberifrs-full:LaterThanSixMonthsAndNotLaterThanOneYearMember2026-03-310001004315nggtf:RetailCustomerReceivablesMemberifrs-full:LaterThanSixMonthsAndNotLaterThanOneYearMember2025-03-310001004315nggtf:RetailCustomerReceivablesMemberifrs-full:LaterThanOneYearMember2026-03-310001004315nggtf:RetailCustomerReceivablesMemberifrs-full:LaterThanOneYearMember2025-03-310001004315ifrs-full:NotLaterThanOneYearMember2026-03-310001004315ifrs-full:NotLaterThanOneYearMember2025-03-310001004315ifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMember2026-03-310001004315ifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMember2025-03-310001004315ifrs-full:LaterThanTwoYearsAndNotLaterThanThreeYearsMember2026-03-310001004315ifrs-full:LaterThanTwoYearsAndNotLaterThanThreeYearsMember2025-03-310001004315ifrs-full:LaterThanThreeYearsAndNotLaterThanFourYearsMember2026-03-310001004315ifrs-full:LaterThanThreeYearsAndNotLaterThanFourYearsMember2025-03-310001004315ifrs-full:LaterThanFourYearsAndNotLaterThanFiveYearsMember2026-03-310001004315ifrs-full:LaterThanFourYearsAndNotLaterThanFiveYearsMember2025-03-310001004315nggtf:BorrowingsPaidByInstalmentsMemberifrs-full:LaterThanFiveYearsMember2026-03-310001004315nggtf:BorrowingsPaidByInstalmentsMemberifrs-full:LaterThanFiveYearsMember2025-03-310001004315nggtf:BorrowingsPaidByOtherThanInstalmentsMemberifrs-full:LaterThanFiveYearsMember2026-03-310001004315nggtf:BorrowingsPaidByOtherThanInstalmentsMemberifrs-full:LaterThanFiveYearsMember2025-03-310001004315ifrs-full:AtFairValueMember2026-03-310001004315ifrs-full:AtFairValueMember2025-03-310001004315ifrs-full:Level1OfFairValueHierarchyMemberifrs-full:AtFairValueMember2026-03-310001004315ifrs-full:Level1OfFairValueHierarchyMemberifrs-full:AtFairValueMember2025-03-310001004315ifrs-full:Level2OfFairValueHierarchyMemberifrs-full:AtFairValueMember2026-03-310001004315ifrs-full:Level2OfFairValueHierarchyMemberifrs-full:AtFairValueMember2025-03-310001004315nggtf:Borrowings1Member2026-03-310001004315nggtf:Borrowings1Member2025-03-310001004315ifrs-full:LaterThanOneYearAndNotLaterThanFiveYearsMember2026-03-310001004315ifrs-full:LaterThanOneYearAndNotLaterThanFiveYearsMember2025-03-310001004315nggtf:NationalGridUKRetirementPlanMembercountry:GBifrs-full:TopOfRangeMember2025-04-012026-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GB2025-03-312025-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GB2025-04-012026-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GB2024-04-012025-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GBsrt:MaximumMember2026-03-310001004315ifrs-full:PensionDefinedBenefitPlansMember2025-07-012025-07-310001004315country:USifrs-full:BottomOfRangeMember2025-04-012026-03-310001004315country:USifrs-full:TopOfRangeMember2025-04-012026-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:US2026-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:USifrs-full:PlanAssetsMember2025-04-012026-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:USifrs-full:PlanAssetsMember2024-04-012025-03-310001004315ifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:US2025-04-012026-03-310001004315ifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:US2024-04-012025-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GB2026-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GB2025-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GB2024-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:US2025-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:US2024-03-310001004315ifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:US2026-03-310001004315ifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:US2025-03-310001004315ifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:US2024-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:US2025-04-012026-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GBnggtf:ActiveMembersMember2026-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GBnggtf:ActiveMembersMember2025-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:USnggtf:ActiveMembersMember2026-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:USnggtf:ActiveMembersMember2025-03-310001004315ifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:USnggtf:ActiveMembersMember2026-03-310001004315ifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:USnggtf:ActiveMembersMember2025-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GBnggtf:DeferredMembersMember2026-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GBnggtf:DeferredMembersMember2025-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:USnggtf:DeferredMembersMember2026-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:USnggtf:DeferredMembersMember2025-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GBnggtf:PensionerMembersMember2026-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GBnggtf:PensionerMembersMember2025-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:USnggtf:PensionerMembersMember2026-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:USnggtf:PensionerMembersMember2025-03-310001004315ifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:USnggtf:PensionerMembersMember2026-03-310001004315ifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:USnggtf:PensionerMembersMember2025-03-310001004315ifrs-full:WhollyOrPartlyFundedDefinedBenefitPlansMemberifrs-full:PensionDefinedBenefitPlansMembercountry:GB2026-03-310001004315ifrs-full:WhollyOrPartlyFundedDefinedBenefitPlansMemberifrs-full:PensionDefinedBenefitPlansMembercountry:GB2025-03-310001004315ifrs-full:WhollyOrPartlyFundedDefinedBenefitPlansMemberifrs-full:PensionDefinedBenefitPlansMembercountry:US2026-03-310001004315ifrs-full:WhollyOrPartlyFundedDefinedBenefitPlansMemberifrs-full:PensionDefinedBenefitPlansMembercountry:US2025-03-310001004315ifrs-full:WhollyOrPartlyFundedDefinedBenefitPlansMemberifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:US2026-03-310001004315ifrs-full:WhollyOrPartlyFundedDefinedBenefitPlansMemberifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:US2025-03-310001004315ifrs-full:WhollyOrPartlyFundedDefinedBenefitPlansMember2026-03-310001004315ifrs-full:WhollyOrPartlyFundedDefinedBenefitPlansMember2025-03-310001004315ifrs-full:WhollyUnfundedDefinedBenefitPlansMemberifrs-full:PensionDefinedBenefitPlansMembercountry:GB2026-03-310001004315ifrs-full:WhollyUnfundedDefinedBenefitPlansMemberifrs-full:PensionDefinedBenefitPlansMembercountry:GB2025-03-310001004315ifrs-full:WhollyUnfundedDefinedBenefitPlansMemberifrs-full:PensionDefinedBenefitPlansMembercountry:US2026-03-310001004315ifrs-full:WhollyUnfundedDefinedBenefitPlansMemberifrs-full:PensionDefinedBenefitPlansMembercountry:US2025-03-310001004315ifrs-full:WhollyUnfundedDefinedBenefitPlansMemberifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:US2026-03-310001004315ifrs-full:WhollyUnfundedDefinedBenefitPlansMemberifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:US2025-03-310001004315ifrs-full:WhollyUnfundedDefinedBenefitPlansMember2026-03-310001004315ifrs-full:WhollyUnfundedDefinedBenefitPlansMember2025-03-310001004315ifrs-full:PropertyPlantAndEquipmentMember2025-04-012026-03-310001004315ifrs-full:PropertyPlantAndEquipmentMember2024-04-012025-03-310001004315ifrs-full:PropertyPlantAndEquipmentMember2023-04-012024-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GB2023-04-012024-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:US2024-04-012025-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:US2023-04-012024-03-310001004315ifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:US2023-04-012024-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GBifrs-full:PresentValueOfDefinedBenefitObligationMember2025-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GBifrs-full:PresentValueOfDefinedBenefitObligationMember2024-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:USifrs-full:PresentValueOfDefinedBenefitObligationMember2025-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:USifrs-full:PresentValueOfDefinedBenefitObligationMember2024-03-310001004315ifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:USifrs-full:PresentValueOfDefinedBenefitObligationMember2025-03-310001004315ifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:USifrs-full:PresentValueOfDefinedBenefitObligationMember2024-03-310001004315ifrs-full:PresentValueOfDefinedBenefitObligationMember2025-03-310001004315ifrs-full:PresentValueOfDefinedBenefitObligationMember2024-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GBifrs-full:PresentValueOfDefinedBenefitObligationMember2025-04-012026-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GBifrs-full:PresentValueOfDefinedBenefitObligationMember2024-04-012025-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:USifrs-full:PresentValueOfDefinedBenefitObligationMember2025-04-012026-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:USifrs-full:PresentValueOfDefinedBenefitObligationMember2024-04-012025-03-310001004315ifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:USifrs-full:PresentValueOfDefinedBenefitObligationMember2025-04-012026-03-310001004315ifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:USifrs-full:PresentValueOfDefinedBenefitObligationMember2024-04-012025-03-310001004315ifrs-full:PresentValueOfDefinedBenefitObligationMember2025-04-012026-03-310001004315ifrs-full:PresentValueOfDefinedBenefitObligationMember2024-04-012025-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GBifrs-full:PresentValueOfDefinedBenefitObligationMember2026-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:USifrs-full:PresentValueOfDefinedBenefitObligationMember2026-03-310001004315ifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:USifrs-full:PresentValueOfDefinedBenefitObligationMember2026-03-310001004315ifrs-full:PresentValueOfDefinedBenefitObligationMember2026-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GBifrs-full:PlanAssetsMember2025-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GBifrs-full:PlanAssetsMember2024-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:USifrs-full:PlanAssetsMember2025-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:USifrs-full:PlanAssetsMember2024-03-310001004315ifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:USifrs-full:PlanAssetsMember2025-03-310001004315ifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:USifrs-full:PlanAssetsMember2024-03-310001004315ifrs-full:PlanAssetsMember2025-03-310001004315ifrs-full:PlanAssetsMember2024-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GBifrs-full:PlanAssetsMember2025-04-012026-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GBifrs-full:PlanAssetsMember2024-04-012025-03-310001004315ifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:USifrs-full:PlanAssetsMember2025-04-012026-03-310001004315ifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:USifrs-full:PlanAssetsMember2024-04-012025-03-310001004315ifrs-full:PlanAssetsMember2025-04-012026-03-310001004315ifrs-full:PlanAssetsMember2024-04-012025-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GBifrs-full:PlanAssetsMember2026-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:USifrs-full:PlanAssetsMember2026-03-310001004315ifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:USifrs-full:PlanAssetsMember2026-03-310001004315ifrs-full:PlanAssetsMember2026-03-310001004315nggtf:AvivaMember2025-04-012026-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GBifrs-full:Level1OfFairValueHierarchyMember2026-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GBifrs-full:Level2And3OfFairValueHierarchyMember2026-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GBifrs-full:Level1OfFairValueHierarchyMember2025-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GBifrs-full:Level2And3OfFairValueHierarchyMember2025-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GBifrs-full:Level1OfFairValueHierarchyMember2024-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GBifrs-full:Level2And3OfFairValueHierarchyMember2024-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GBnggtf:CorporateBondsNettingMemberifrs-full:Level1OfFairValueHierarchyMember2026-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GBnggtf:CorporateBondsNettingMemberifrs-full:Level2And3OfFairValueHierarchyMember2026-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GBnggtf:CorporateBondsNettingMember2026-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GBnggtf:CorporateBondsNettingMemberifrs-full:Level1OfFairValueHierarchyMember2025-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GBnggtf:CorporateBondsNettingMemberifrs-full:Level2And3OfFairValueHierarchyMember2025-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GBnggtf:CorporateBondsNettingMember2025-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GBnggtf:CorporateBondsNettingMemberifrs-full:Level1OfFairValueHierarchyMember2024-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GBnggtf:CorporateBondsNettingMemberifrs-full:Level2And3OfFairValueHierarchyMember2024-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GBnggtf:CorporateBondsNettingMember2024-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GBnggtf:GovernmentSecuritiesAndLiabilityDrivenInvestmentsMemberifrs-full:Level1OfFairValueHierarchyMember2026-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GBnggtf:GovernmentSecuritiesAndLiabilityDrivenInvestmentsMemberifrs-full:Level2And3OfFairValueHierarchyMember2026-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GBnggtf:GovernmentSecuritiesAndLiabilityDrivenInvestmentsMember2026-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GBnggtf:GovernmentSecuritiesAndLiabilityDrivenInvestmentsMemberifrs-full:Level1OfFairValueHierarchyMember2025-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GBnggtf:GovernmentSecuritiesAndLiabilityDrivenInvestmentsMemberifrs-full:Level2And3OfFairValueHierarchyMember2025-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GBnggtf:GovernmentSecuritiesAndLiabilityDrivenInvestmentsMember2025-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GBnggtf:GovernmentSecuritiesAndLiabilityDrivenInvestmentsMemberifrs-full:Level1OfFairValueHierarchyMember2024-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GBnggtf:GovernmentSecuritiesAndLiabilityDrivenInvestmentsMemberifrs-full:Level2And3OfFairValueHierarchyMember2024-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GBnggtf:GovernmentSecuritiesAndLiabilityDrivenInvestmentsMember2024-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:USifrs-full:Level1OfFairValueHierarchyMember2026-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:USifrs-full:Level2And3OfFairValueHierarchyMember2026-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:USifrs-full:Level1OfFairValueHierarchyMember2025-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:USifrs-full:Level2And3OfFairValueHierarchyMember2025-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:USifrs-full:Level1OfFairValueHierarchyMember2024-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:USifrs-full:Level2And3OfFairValueHierarchyMember2024-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:USnggtf:CorporateBondsNettingMemberifrs-full:Level1OfFairValueHierarchyMember2026-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:USnggtf:CorporateBondsNettingMemberifrs-full:Level2And3OfFairValueHierarchyMember2026-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:USnggtf:CorporateBondsNettingMember2026-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:USnggtf:CorporateBondsNettingMemberifrs-full:Level1OfFairValueHierarchyMember2025-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:USnggtf:CorporateBondsNettingMemberifrs-full:Level2And3OfFairValueHierarchyMember2025-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:USnggtf:CorporateBondsNettingMember2025-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:USnggtf:CorporateBondsNettingMemberifrs-full:Level1OfFairValueHierarchyMember2024-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:USnggtf:CorporateBondsNettingMemberifrs-full:Level2And3OfFairValueHierarchyMember2024-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:USnggtf:CorporateBondsNettingMember2024-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:USnggtf:GovernmentSecuritiesMemberifrs-full:Level1OfFairValueHierarchyMember2026-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:USnggtf:GovernmentSecuritiesMemberifrs-full:Level2And3OfFairValueHierarchyMember2026-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:USnggtf:GovernmentSecuritiesMember2026-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:USnggtf:GovernmentSecuritiesMemberifrs-full:Level1OfFairValueHierarchyMember2025-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:USnggtf:GovernmentSecuritiesMemberifrs-full:Level2And3OfFairValueHierarchyMember2025-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:USnggtf:GovernmentSecuritiesMember2025-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:USnggtf:GovernmentSecuritiesMemberifrs-full:Level1OfFairValueHierarchyMember2024-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:USnggtf:GovernmentSecuritiesMemberifrs-full:Level2And3OfFairValueHierarchyMember2024-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:USnggtf:GovernmentSecuritiesMember2024-03-310001004315ifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:USifrs-full:Level1OfFairValueHierarchyMember2026-03-310001004315ifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:USifrs-full:Level2And3OfFairValueHierarchyMember2026-03-310001004315ifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:USifrs-full:Level1OfFairValueHierarchyMember2025-03-310001004315ifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:USifrs-full:Level2And3OfFairValueHierarchyMember2025-03-310001004315ifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:USifrs-full:Level1OfFairValueHierarchyMember2024-03-310001004315ifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:USifrs-full:Level2And3OfFairValueHierarchyMember2024-03-310001004315ifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:USnggtf:CorporateBondsNettingMemberifrs-full:Level1OfFairValueHierarchyMember2026-03-310001004315ifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:USnggtf:CorporateBondsNettingMemberifrs-full:Level2And3OfFairValueHierarchyMember2026-03-310001004315ifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:USnggtf:CorporateBondsNettingMember2026-03-310001004315ifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:USnggtf:CorporateBondsNettingMemberifrs-full:Level1OfFairValueHierarchyMember2025-03-310001004315ifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:USnggtf:CorporateBondsNettingMemberifrs-full:Level2And3OfFairValueHierarchyMember2025-03-310001004315ifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:USnggtf:CorporateBondsNettingMember2025-03-310001004315ifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:USnggtf:CorporateBondsNettingMemberifrs-full:Level1OfFairValueHierarchyMember2024-03-310001004315ifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:USnggtf:CorporateBondsNettingMemberifrs-full:Level2And3OfFairValueHierarchyMember2024-03-310001004315ifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:USnggtf:CorporateBondsNettingMember2024-03-310001004315ifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:USnggtf:GovernmentSecuritiesMemberifrs-full:Level1OfFairValueHierarchyMember2026-03-310001004315ifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:USnggtf:GovernmentSecuritiesMemberifrs-full:Level2And3OfFairValueHierarchyMember2026-03-310001004315ifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:USnggtf:GovernmentSecuritiesMember2026-03-310001004315ifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:USnggtf:GovernmentSecuritiesMemberifrs-full:Level1OfFairValueHierarchyMember2025-03-310001004315ifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:USnggtf:GovernmentSecuritiesMemberifrs-full:Level2And3OfFairValueHierarchyMember2025-03-310001004315ifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:USnggtf:GovernmentSecuritiesMember2025-03-310001004315ifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:USnggtf:GovernmentSecuritiesMemberifrs-full:Level1OfFairValueHierarchyMember2024-03-310001004315ifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:USnggtf:GovernmentSecuritiesMemberifrs-full:Level2And3OfFairValueHierarchyMember2024-03-310001004315ifrs-full:PostemploymentMedicalDefinedBenefitPlansMembercountry:USnggtf:GovernmentSecuritiesMember2024-03-310001004315ifrs-full:OtherEnvironmentRelatedProvisionMember2024-03-310001004315ifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMember2024-03-310001004315ifrs-full:MiscellaneousOtherProvisionsMember2024-03-310001004315ifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMember2024-04-012025-03-310001004315ifrs-full:MiscellaneousOtherProvisionsMember2024-04-012025-03-310001004315ifrs-full:OtherEnvironmentRelatedProvisionMember2025-03-310001004315ifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMember2025-03-310001004315ifrs-full:MiscellaneousOtherProvisionsMember2025-03-310001004315ifrs-full:OtherEnvironmentRelatedProvisionMember2025-04-012026-03-310001004315ifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMember2025-04-012026-03-310001004315ifrs-full:MiscellaneousOtherProvisionsMember2025-04-012026-03-310001004315ifrs-full:OtherEnvironmentRelatedProvisionMember2026-03-310001004315ifrs-full:ProvisionForDecommissioningRestorationAndRehabilitationCostsMember2026-03-310001004315ifrs-full:MiscellaneousOtherProvisionsMember2026-03-310001004315country:USifrs-full:OtherEnvironmentRelatedProvisionMember2024-04-012025-03-310001004315ifrs-full:OtherEnvironmentRelatedProvisionMember2023-04-012024-03-310001004315country:GBifrs-full:OtherEnvironmentRelatedProvisionMember2026-03-310001004315country:GBifrs-full:OtherEnvironmentRelatedProvisionMember2025-04-012026-03-310001004315country:GBifrs-full:OtherEnvironmentRelatedProvisionMember2025-03-310001004315country:GBifrs-full:OtherEnvironmentRelatedProvisionMember2024-04-012025-03-310001004315country:USifrs-full:OtherEnvironmentRelatedProvisionMember2026-03-310001004315country:USifrs-full:OtherEnvironmentRelatedProvisionMember2025-04-012026-03-310001004315country:USifrs-full:OtherEnvironmentRelatedProvisionMember2025-03-310001004315nggtf:LiabilityForClaimsAndClaimsAdjustmentMember2026-03-310001004315nggtf:LiabilityForClaimsAndClaimsAdjustmentMember2025-03-310001004315nggtf:LiabilityForInterconnectorExcessRevenuesMember2026-03-310001004315nggtf:LiabilityForInterconnectorExcessRevenuesMember2025-03-310001004315nggtf:LiabilityForEmissionProvisionsMember2026-03-310001004315nggtf:LiabilityForEmissionProvisionsMember2025-03-3100010043152024-06-012024-06-3000010043152024-06-300001004315ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember2023-03-310001004315ifrs-full:ReserveOfCashFlowHedgesMember2023-03-310001004315nggtf:ReserveOfCostOfHedgingMember2023-03-310001004315ifrs-full:ReserveOfGainsAndLossesOnFinancialAssetsMeasuredAtFairValueThroughOtherComprehensiveIncomeMember2023-03-310001004315ifrs-full:CapitalRedemptionReserveMember2023-03-310001004315ifrs-full:MergerReserveMember2023-03-310001004315ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember2023-04-012024-03-310001004315ifrs-full:ReserveOfCashFlowHedgesMember2023-04-012024-03-310001004315nggtf:ReserveOfCostOfHedgingMember2023-04-012024-03-310001004315ifrs-full:ReserveOfGainsAndLossesOnFinancialAssetsMeasuredAtFairValueThroughOtherComprehensiveIncomeMember2023-04-012024-03-310001004315ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember2024-03-310001004315ifrs-full:ReserveOfCashFlowHedgesMember2024-03-310001004315nggtf:ReserveOfCostOfHedgingMember2024-03-310001004315ifrs-full:ReserveOfGainsAndLossesOnFinancialAssetsMeasuredAtFairValueThroughOtherComprehensiveIncomeMember2024-03-310001004315ifrs-full:CapitalRedemptionReserveMember2024-03-310001004315ifrs-full:MergerReserveMember2024-03-310001004315ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember2024-04-012025-03-310001004315ifrs-full:ReserveOfCashFlowHedgesMember2024-04-012025-03-310001004315nggtf:ReserveOfCostOfHedgingMember2024-04-012025-03-310001004315ifrs-full:ReserveOfGainsAndLossesOnFinancialAssetsMeasuredAtFairValueThroughOtherComprehensiveIncomeMember2024-04-012025-03-310001004315ifrs-full:MergerReserveMember2024-04-012025-03-310001004315ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember2025-03-310001004315ifrs-full:ReserveOfCashFlowHedgesMember2025-03-310001004315nggtf:ReserveOfCostOfHedgingMember2025-03-310001004315ifrs-full:ReserveOfGainsAndLossesOnFinancialAssetsMeasuredAtFairValueThroughOtherComprehensiveIncomeMember2025-03-310001004315ifrs-full:CapitalRedemptionReserveMember2025-03-310001004315ifrs-full:MergerReserveMember2025-03-310001004315ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember2025-04-012026-03-310001004315ifrs-full:ReserveOfCashFlowHedgesMember2025-04-012026-03-310001004315nggtf:ReserveOfCostOfHedgingMember2025-04-012026-03-310001004315ifrs-full:ReserveOfGainsAndLossesOnFinancialAssetsMeasuredAtFairValueThroughOtherComprehensiveIncomeMember2025-04-012026-03-310001004315ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember2026-03-310001004315ifrs-full:ReserveOfCashFlowHedgesMember2026-03-310001004315nggtf:ReserveOfCostOfHedgingMember2026-03-310001004315ifrs-full:ReserveOfGainsAndLossesOnFinancialAssetsMeasuredAtFairValueThroughOtherComprehensiveIncomeMember2026-03-310001004315ifrs-full:CapitalRedemptionReserveMember2026-03-310001004315ifrs-full:MergerReserveMember2026-03-310001004315nggtf:NationalGridRenewablesMember2025-04-012026-03-310001004315nggtf:Borrowings1Member2025-03-310001004315nggtf:FinancingDerivativesHedgingMember2025-03-310001004315nggtf:Borrowings1Member2025-04-012026-03-310001004315nggtf:FinancingDerivativesHedgingMember2025-04-012026-03-310001004315nggtf:Borrowings1Member2026-03-310001004315nggtf:FinancingDerivativesHedgingMember2026-03-310001004315nggtf:NonCurrentAssetsMembernggtf:FinancingDerivativesHedgingMember2026-03-310001004315nggtf:NonCurrentAssetsMember2026-03-310001004315nggtf:CurrentAssetsMembernggtf:FinancingDerivativesHedgingMember2026-03-310001004315nggtf:CurrentAssetsMember2026-03-310001004315nggtf:CurrentLiabilitiesMembernggtf:Borrowings1Member2026-03-310001004315nggtf:CurrentLiabilitiesMembernggtf:FinancingDerivativesHedgingMember2026-03-310001004315nggtf:CurrentLiabilitiesMember2026-03-310001004315nggtf:NonCurrentLiabilitiesMembernggtf:Borrowings1Member2026-03-310001004315nggtf:NonCurrentLiabilitiesMembernggtf:FinancingDerivativesHedgingMember2026-03-310001004315nggtf:NonCurrentLiabilitiesMember2026-03-310001004315nggtf:Borrowings1Member2024-03-310001004315nggtf:FinancingDerivativesHedgingMember2024-03-310001004315nggtf:Borrowings1Member2024-04-012025-03-310001004315nggtf:FinancingDerivativesHedgingMember2024-04-012025-03-310001004315nggtf:Borrowings1Member2023-03-310001004315nggtf:FinancingDerivativesHedgingMember2023-03-310001004315nggtf:Borrowings1Member2023-04-012024-03-310001004315nggtf:FinancingDerivativesHedgingMember2023-04-012024-03-310001004315nggtf:OfgemsInvestigationNorthHydeSubstationIncidentMember2025-04-012026-03-310001004315ifrs-full:JointVenturesWhereEntityIsVenturerMember2025-04-012026-03-310001004315ifrs-full:JointVenturesWhereEntityIsVenturerMember2024-04-012025-03-310001004315ifrs-full:JointVenturesWhereEntityIsVenturerMember2023-04-012024-03-310001004315ifrs-full:AssociatesMember2025-04-012026-03-310001004315ifrs-full:AssociatesMember2024-04-012025-03-310001004315ifrs-full:AssociatesMember2023-04-012024-03-310001004315nggtf:SubsidiariesOfAnAssociateMember2025-04-012026-03-310001004315nggtf:SubsidiariesOfAnAssociateMember2024-04-012025-03-310001004315nggtf:SubsidiariesOfAnAssociateMember2023-04-012024-03-310001004315nggtf:PensionDefinedBenefitPlansRelatedPartyMember2025-04-012026-03-310001004315nggtf:PensionDefinedBenefitPlansRelatedPartyMember2024-04-012025-03-310001004315nggtf:PensionDefinedBenefitPlansRelatedPartyMember2023-04-012024-03-310001004315ifrs-full:JointVenturesWhereEntityIsVenturerMember2026-03-310001004315ifrs-full:JointVenturesWhereEntityIsVenturerMember2025-03-310001004315ifrs-full:JointVenturesWhereEntityIsVenturerMember2024-03-310001004315ifrs-full:AssociatesMember2026-03-310001004315ifrs-full:AssociatesMember2025-03-310001004315ifrs-full:AssociatesMember2024-03-310001004315nggtf:SubsidiariesOfAnAssociateMember2026-03-310001004315nggtf:SubsidiariesOfAnAssociateMember2025-03-310001004315nggtf:SubsidiariesOfAnAssociateMember2024-03-310001004315nggtf:EmeraldEnergyVentureLLCMemberifrs-full:JointVenturesWhereEntityIsVenturerMember2025-04-012026-03-310001004315nggtf:EmeraldEnergyVentureLLCMemberifrs-full:JointVenturesWhereEntityIsVenturerMember2024-04-012025-03-310001004315nggtf:EmeraldEnergyVentureLLCMemberifrs-full:JointVenturesWhereEntityIsVenturerMember2023-04-012024-03-310001004315nggtf:NemoLinkLimitedMemberifrs-full:JointVenturesWhereEntityIsVenturerMember2025-04-012026-03-310001004315nggtf:NemoLinkLimitedMemberifrs-full:JointVenturesWhereEntityIsVenturerMember2024-04-012025-03-310001004315nggtf:NemoLinkLimitedMemberifrs-full:JointVenturesWhereEntityIsVenturerMember2023-04-012024-03-310001004315nggtf:NationalGasTransmissionPlcMembernggtf:SubsidiariesOfAnAssociateMember2025-04-012026-03-310001004315nggtf:NationalGasTransmissionPlcMembernggtf:SubsidiariesOfAnAssociateMember2024-04-012025-03-310001004315nggtf:NationalGasTransmissionPlcMembernggtf:SubsidiariesOfAnAssociateMember2023-04-012024-03-310001004315nggtf:EmeraldEnergyVentureLLCMemberifrs-full:JointVenturesWhereEntityIsVenturerMember2026-03-310001004315nggtf:EmeraldEnergyVentureLLCMemberifrs-full:JointVenturesWhereEntityIsVenturerMember2025-03-310001004315nggtf:EmeraldEnergyVentureLLCMemberifrs-full:JointVenturesWhereEntityIsVenturerMember2024-03-310001004315nggtf:BritNedDevelopmentLimitedMemberifrs-full:JointVenturesWhereEntityIsVenturerMember2025-04-012026-03-310001004315nggtf:BritNedDevelopmentLimitedMemberifrs-full:JointVenturesWhereEntityIsVenturerMember2024-04-012025-03-310001004315nggtf:BritNedDevelopmentLimitedMemberifrs-full:JointVenturesWhereEntityIsVenturerMember2023-04-012024-03-310001004315nggtf:NewYorkTranscoLLCMemberifrs-full:AssociatesMember2025-04-012026-03-310001004315nggtf:NewYorkTranscoLLCMemberifrs-full:AssociatesMember2024-04-012025-03-310001004315nggtf:NewYorkTranscoLLCMemberifrs-full:AssociatesMember2023-04-012024-03-310001004315nggtf:GasTTopCoLimitedMemberifrs-full:AssociatesMember2024-04-012025-03-310001004315nggtf:GasTTopCoLimitedMemberifrs-full:AssociatesMember2023-04-012024-03-310001004315nggtf:AAAG7SovereignEntitiesMember2026-03-310001004315nggtf:AAAG7SovereignEntitiesMemberifrs-full:LaterThanOneYearMember2026-03-310001004315nggtf:AAAInvestmentVehiclesMember2026-03-310001004315nggtf:AAAInvestmentVehiclesMember2025-04-012026-03-310001004315nggtf:AAAInstitutionsAndNonG7SovereignEntitiesMember2026-03-310001004315nggtf:AAAInstitutionsAndNonG7SovereignEntitiesMemberifrs-full:LaterThanOneYearMember2026-03-310001004315nggtf:AAPlusG7SovereignEntitiesMember2026-03-310001004315nggtf:AAPlusG7SovereignEntitiesMemberifrs-full:LaterThanOneYearMember2026-03-310001004315nggtf:AAInstitutionsMemberifrs-full:BottomOfRangeMember2026-03-310001004315nggtf:AAInstitutionsMemberifrs-full:TopOfRangeMember2026-03-310001004315nggtf:AAInstitutionsMemberifrs-full:BottomOfRangeMember2025-04-012026-03-310001004315nggtf:AAInstitutionsMemberifrs-full:TopOfRangeMember2025-04-012026-03-310001004315nggtf:AAInstitutionsMemberifrs-full:LaterThanOneYearMemberifrs-full:BottomOfRangeMember2026-03-310001004315nggtf:AAInstitutionsMemberifrs-full:LaterThanOneYearMemberifrs-full:TopOfRangeMember2026-03-310001004315nggtf:AAInstitutionsMemberifrs-full:LaterThanOneYearMemberifrs-full:BottomOfRangeMember2025-04-012026-03-310001004315nggtf:AAInstitutionsMemberifrs-full:LaterThanOneYearMemberifrs-full:TopOfRangeMember2025-04-012026-03-310001004315nggtf:AInstitutionsMemberifrs-full:BottomOfRangeMember2026-03-310001004315nggtf:AInstitutionsMemberifrs-full:TopOfRangeMember2026-03-310001004315nggtf:AInstitutionsMemberifrs-full:BottomOfRangeMember2025-04-012026-03-310001004315nggtf:AInstitutionsMemberifrs-full:TopOfRangeMember2025-04-012026-03-310001004315nggtf:AInstitutionsMemberifrs-full:LaterThanOneYearMemberifrs-full:BottomOfRangeMember2026-03-310001004315nggtf:AInstitutionsMemberifrs-full:LaterThanOneYearMemberifrs-full:TopOfRangeMember2026-03-310001004315nggtf:AInstitutionsMemberifrs-full:LaterThanOneYearMemberifrs-full:BottomOfRangeMember2025-04-012026-03-310001004315nggtf:AInstitutionsMemberifrs-full:LaterThanOneYearMemberifrs-full:TopOfRangeMember2025-04-012026-03-310001004315ifrs-full:CreditRiskMembernggtf:BankAccountAndBankOverdraftMember2026-03-310001004315ifrs-full:CreditRiskMembernggtf:BankAccountAndBankOverdraftMember2025-03-310001004315ifrs-full:CreditRiskMembernggtf:FinancingDerivativesMember2026-03-310001004315ifrs-full:CreditRiskMembernggtf:CommodityDerivativesMember2026-03-310001004315ifrs-full:CreditRiskMember2026-03-310001004315ifrs-full:CreditRiskMembernggtf:FinancingDerivativesMember2026-03-310001004315ifrs-full:CreditRiskMembernggtf:CommodityDerivativesMember2026-03-310001004315ifrs-full:CreditRiskMembernggtf:FinancingDerivativesMember2025-03-310001004315ifrs-full:CreditRiskMembernggtf:CommodityDerivativesMember2025-03-310001004315ifrs-full:CreditRiskMember2025-03-310001004315ifrs-full:CreditRiskMembernggtf:FinancingDerivativesMember2025-03-310001004315ifrs-full:CreditRiskMembernggtf:CommodityDerivativesMember2025-03-310001004315ifrs-full:CreditRiskMembernggtf:CommodityDerivativesNettingMember2025-03-310001004315ifrs-full:LiquidityRiskMemberifrs-full:NotLaterThanOneYearMember2026-03-310001004315ifrs-full:LiquidityRiskMemberifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMember2026-03-310001004315ifrs-full:LiquidityRiskMemberifrs-full:LaterThanTwoYearsAndNotLaterThanThreeYearsMember2026-03-310001004315ifrs-full:LiquidityRiskMemberifrs-full:LaterThanThreeYearsMember2026-03-310001004315ifrs-full:LiquidityRiskMember2026-03-310001004315ifrs-full:LiquidityRiskMemberifrs-full:NotLaterThanOneYearMembernggtf:FinancingDerivativesReceiptsMember2026-03-310001004315ifrs-full:LiquidityRiskMemberifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMembernggtf:FinancingDerivativesReceiptsMember2026-03-310001004315ifrs-full:LiquidityRiskMemberifrs-full:LaterThanTwoYearsAndNotLaterThanThreeYearsMembernggtf:FinancingDerivativesReceiptsMember2026-03-310001004315ifrs-full:LiquidityRiskMemberifrs-full:LaterThanThreeYearsMembernggtf:FinancingDerivativesReceiptsMember2026-03-310001004315ifrs-full:LiquidityRiskMembernggtf:FinancingDerivativesReceiptsMember2026-03-310001004315ifrs-full:LiquidityRiskMemberifrs-full:NotLaterThanOneYearMembernggtf:FinancingDerivativesPaymentsMember2026-03-310001004315ifrs-full:LiquidityRiskMemberifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMembernggtf:FinancingDerivativesPaymentsMember2026-03-310001004315ifrs-full:LiquidityRiskMemberifrs-full:LaterThanTwoYearsAndNotLaterThanThreeYearsMembernggtf:FinancingDerivativesPaymentsMember2026-03-310001004315ifrs-full:LiquidityRiskMemberifrs-full:LaterThanThreeYearsMembernggtf:FinancingDerivativesPaymentsMember2026-03-310001004315ifrs-full:LiquidityRiskMembernggtf:FinancingDerivativesPaymentsMember2026-03-310001004315ifrs-full:LiquidityRiskMemberifrs-full:NotLaterThanOneYearMembernggtf:CommodityDerivativesReceiptsMember2026-03-310001004315ifrs-full:LiquidityRiskMemberifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMembernggtf:CommodityDerivativesReceiptsMember2026-03-310001004315ifrs-full:LiquidityRiskMemberifrs-full:LaterThanTwoYearsAndNotLaterThanThreeYearsMembernggtf:CommodityDerivativesReceiptsMember2026-03-310001004315ifrs-full:LiquidityRiskMemberifrs-full:LaterThanThreeYearsMembernggtf:CommodityDerivativesReceiptsMember2026-03-310001004315ifrs-full:LiquidityRiskMembernggtf:CommodityDerivativesReceiptsMember2026-03-310001004315ifrs-full:LiquidityRiskMemberifrs-full:NotLaterThanOneYearMembernggtf:CommodityDerivativesPaymentsMember2026-03-310001004315ifrs-full:LiquidityRiskMemberifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMembernggtf:CommodityDerivativesPaymentsMember2026-03-310001004315ifrs-full:LiquidityRiskMemberifrs-full:LaterThanTwoYearsAndNotLaterThanThreeYearsMembernggtf:CommodityDerivativesPaymentsMember2026-03-310001004315ifrs-full:LiquidityRiskMemberifrs-full:LaterThanThreeYearsMembernggtf:CommodityDerivativesPaymentsMember2026-03-310001004315ifrs-full:LiquidityRiskMembernggtf:CommodityDerivativesPaymentsMember2026-03-310001004315nggtf:FinancingDerivativesReceiptsMemberifrs-full:LiquidityRiskMemberifrs-full:NotLaterThanOneYearMember2026-03-310001004315nggtf:FinancingDerivativesReceiptsMemberifrs-full:LiquidityRiskMemberifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMember2026-03-310001004315nggtf:FinancingDerivativesReceiptsMemberifrs-full:LiquidityRiskMemberifrs-full:LaterThanTwoYearsAndNotLaterThanThreeYearsMember2026-03-310001004315nggtf:FinancingDerivativesReceiptsMemberifrs-full:LiquidityRiskMemberifrs-full:LaterThanThreeYearsMember2026-03-310001004315ifrs-full:LiquidityRiskMembernggtf:FinancingDerivativesReceiptsMember2026-03-310001004315nggtf:FinancingDerivativesPaymentsMemberifrs-full:LiquidityRiskMemberifrs-full:NotLaterThanOneYearMember2026-03-310001004315nggtf:FinancingDerivativesPaymentsMemberifrs-full:LiquidityRiskMemberifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMember2026-03-310001004315nggtf:FinancingDerivativesPaymentsMemberifrs-full:LiquidityRiskMemberifrs-full:LaterThanTwoYearsAndNotLaterThanThreeYearsMember2026-03-310001004315nggtf:FinancingDerivativesPaymentsMemberifrs-full:LiquidityRiskMemberifrs-full:LaterThanThreeYearsMember2026-03-310001004315ifrs-full:LiquidityRiskMembernggtf:FinancingDerivativesPaymentsMember2026-03-310001004315nggtf:CommodityDerivativesReceiptsMemberifrs-full:LiquidityRiskMemberifrs-full:NotLaterThanOneYearMember2026-03-310001004315nggtf:CommodityDerivativesReceiptsMemberifrs-full:LiquidityRiskMemberifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMember2026-03-310001004315nggtf:CommodityDerivativesReceiptsMemberifrs-full:LiquidityRiskMemberifrs-full:LaterThanTwoYearsAndNotLaterThanThreeYearsMember2026-03-310001004315nggtf:CommodityDerivativesReceiptsMemberifrs-full:LiquidityRiskMemberifrs-full:LaterThanThreeYearsMember2026-03-310001004315ifrs-full:LiquidityRiskMembernggtf:CommodityDerivativesReceiptsMember2026-03-310001004315nggtf:CommodityDerivativesPaymentsMemberifrs-full:LiquidityRiskMemberifrs-full:NotLaterThanOneYearMember2026-03-310001004315nggtf:CommodityDerivativesPaymentsMemberifrs-full:LiquidityRiskMemberifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMember2026-03-310001004315nggtf:CommodityDerivativesPaymentsMemberifrs-full:LiquidityRiskMemberifrs-full:LaterThanTwoYearsAndNotLaterThanThreeYearsMember2026-03-310001004315nggtf:CommodityDerivativesPaymentsMemberifrs-full:LiquidityRiskMemberifrs-full:LaterThanThreeYearsMember2026-03-310001004315ifrs-full:LiquidityRiskMembernggtf:CommodityDerivativesPaymentsMember2026-03-310001004315ifrs-full:LiquidityRiskMemberifrs-full:NotLaterThanOneYearMember2025-03-310001004315ifrs-full:LiquidityRiskMemberifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMember2025-03-310001004315ifrs-full:LiquidityRiskMemberifrs-full:LaterThanTwoYearsAndNotLaterThanThreeYearsMember2025-03-310001004315ifrs-full:LiquidityRiskMemberifrs-full:LaterThanThreeYearsMember2025-03-310001004315ifrs-full:LiquidityRiskMember2025-03-310001004315ifrs-full:LiquidityRiskMemberifrs-full:NotLaterThanOneYearMembernggtf:FinancingDerivativesReceiptsMember2025-03-310001004315ifrs-full:LiquidityRiskMemberifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMembernggtf:FinancingDerivativesReceiptsMember2025-03-310001004315ifrs-full:LiquidityRiskMemberifrs-full:LaterThanTwoYearsAndNotLaterThanThreeYearsMembernggtf:FinancingDerivativesReceiptsMember2025-03-310001004315ifrs-full:LiquidityRiskMemberifrs-full:LaterThanThreeYearsMembernggtf:FinancingDerivativesReceiptsMember2025-03-310001004315ifrs-full:LiquidityRiskMembernggtf:FinancingDerivativesReceiptsMember2025-03-310001004315ifrs-full:LiquidityRiskMemberifrs-full:NotLaterThanOneYearMembernggtf:FinancingDerivativesPaymentsMember2025-03-310001004315ifrs-full:LiquidityRiskMemberifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMembernggtf:FinancingDerivativesPaymentsMember2025-03-310001004315ifrs-full:LiquidityRiskMemberifrs-full:LaterThanTwoYearsAndNotLaterThanThreeYearsMembernggtf:FinancingDerivativesPaymentsMember2025-03-310001004315ifrs-full:LiquidityRiskMemberifrs-full:LaterThanThreeYearsMembernggtf:FinancingDerivativesPaymentsMember2025-03-310001004315ifrs-full:LiquidityRiskMembernggtf:FinancingDerivativesPaymentsMember2025-03-310001004315ifrs-full:LiquidityRiskMemberifrs-full:NotLaterThanOneYearMembernggtf:CommodityDerivativesReceiptsMember2025-03-310001004315ifrs-full:LiquidityRiskMemberifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMembernggtf:CommodityDerivativesReceiptsMember2025-03-310001004315ifrs-full:LiquidityRiskMemberifrs-full:LaterThanTwoYearsAndNotLaterThanThreeYearsMembernggtf:CommodityDerivativesReceiptsMember2025-03-310001004315ifrs-full:LiquidityRiskMemberifrs-full:LaterThanThreeYearsMembernggtf:CommodityDerivativesReceiptsMember2025-03-310001004315ifrs-full:LiquidityRiskMembernggtf:CommodityDerivativesReceiptsMember2025-03-310001004315ifrs-full:LiquidityRiskMemberifrs-full:NotLaterThanOneYearMembernggtf:CommodityDerivativesPaymentsMember2025-03-310001004315ifrs-full:LiquidityRiskMemberifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMembernggtf:CommodityDerivativesPaymentsMember2025-03-310001004315ifrs-full:LiquidityRiskMemberifrs-full:LaterThanTwoYearsAndNotLaterThanThreeYearsMembernggtf:CommodityDerivativesPaymentsMember2025-03-310001004315ifrs-full:LiquidityRiskMemberifrs-full:LaterThanThreeYearsMembernggtf:CommodityDerivativesPaymentsMember2025-03-310001004315ifrs-full:LiquidityRiskMembernggtf:CommodityDerivativesPaymentsMember2025-03-310001004315nggtf:FinancingDerivativesReceiptsMemberifrs-full:LiquidityRiskMemberifrs-full:NotLaterThanOneYearMember2025-03-310001004315nggtf:FinancingDerivativesReceiptsMemberifrs-full:LiquidityRiskMemberifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMember2025-03-310001004315nggtf:FinancingDerivativesReceiptsMemberifrs-full:LiquidityRiskMemberifrs-full:LaterThanTwoYearsAndNotLaterThanThreeYearsMember2025-03-310001004315nggtf:FinancingDerivativesReceiptsMemberifrs-full:LiquidityRiskMemberifrs-full:LaterThanThreeYearsMember2025-03-310001004315ifrs-full:LiquidityRiskMembernggtf:FinancingDerivativesReceiptsMember2025-03-310001004315nggtf:FinancingDerivativesPaymentsMemberifrs-full:LiquidityRiskMemberifrs-full:NotLaterThanOneYearMember2025-03-310001004315nggtf:FinancingDerivativesPaymentsMemberifrs-full:LiquidityRiskMemberifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMember2025-03-310001004315nggtf:FinancingDerivativesPaymentsMemberifrs-full:LiquidityRiskMemberifrs-full:LaterThanTwoYearsAndNotLaterThanThreeYearsMember2025-03-310001004315nggtf:FinancingDerivativesPaymentsMemberifrs-full:LiquidityRiskMemberifrs-full:LaterThanThreeYearsMember2025-03-310001004315ifrs-full:LiquidityRiskMembernggtf:FinancingDerivativesPaymentsMember2025-03-310001004315nggtf:CommodityDerivativesReceiptsMemberifrs-full:LiquidityRiskMemberifrs-full:NotLaterThanOneYearMember2025-03-310001004315nggtf:CommodityDerivativesReceiptsMemberifrs-full:LiquidityRiskMemberifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMember2025-03-310001004315nggtf:CommodityDerivativesReceiptsMemberifrs-full:LiquidityRiskMemberifrs-full:LaterThanTwoYearsAndNotLaterThanThreeYearsMember2025-03-310001004315nggtf:CommodityDerivativesReceiptsMemberifrs-full:LiquidityRiskMemberifrs-full:LaterThanThreeYearsMember2025-03-310001004315ifrs-full:LiquidityRiskMembernggtf:CommodityDerivativesReceiptsMember2025-03-310001004315nggtf:CommodityDerivativesPaymentsMemberifrs-full:LiquidityRiskMemberifrs-full:NotLaterThanOneYearMember2025-03-310001004315nggtf:CommodityDerivativesPaymentsMemberifrs-full:LiquidityRiskMemberifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMember2025-03-310001004315nggtf:CommodityDerivativesPaymentsMemberifrs-full:LiquidityRiskMemberifrs-full:LaterThanTwoYearsAndNotLaterThanThreeYearsMember2025-03-310001004315nggtf:CommodityDerivativesPaymentsMemberifrs-full:LiquidityRiskMemberifrs-full:LaterThanThreeYearsMember2025-03-310001004315ifrs-full:LiquidityRiskMembernggtf:CommodityDerivativesPaymentsMember2025-03-310001004315currency:GBPnggtf:CashAndCashEquivalents1Memberifrs-full:CurrencyRiskMember2026-03-310001004315currency:EURnggtf:CashAndCashEquivalents1Memberifrs-full:CurrencyRiskMember2026-03-310001004315currency:USDnggtf:CashAndCashEquivalents1Memberifrs-full:CurrencyRiskMember2026-03-310001004315srt:OtherCurrencyMembernggtf:CashAndCashEquivalents1Memberifrs-full:CurrencyRiskMember2026-03-310001004315nggtf:CashAndCashEquivalents1Memberifrs-full:CurrencyRiskMember2026-03-310001004315currency:GBPnggtf:FinancialInvestmentsMemberifrs-full:CurrencyRiskMember2026-03-310001004315currency:EURnggtf:FinancialInvestmentsMemberifrs-full:CurrencyRiskMember2026-03-310001004315currency:USDnggtf:FinancialInvestmentsMemberifrs-full:CurrencyRiskMember2026-03-310001004315srt:OtherCurrencyMembernggtf:FinancialInvestmentsMemberifrs-full:CurrencyRiskMember2026-03-310001004315nggtf:FinancialInvestmentsMemberifrs-full:CurrencyRiskMember2026-03-310001004315currency:GBPnggtf:Borrowings1Memberifrs-full:CurrencyRiskMember2026-03-310001004315currency:EURnggtf:Borrowings1Memberifrs-full:CurrencyRiskMember2026-03-310001004315currency:USDnggtf:Borrowings1Memberifrs-full:CurrencyRiskMember2026-03-310001004315srt:OtherCurrencyMembernggtf:Borrowings1Memberifrs-full:CurrencyRiskMember2026-03-310001004315nggtf:Borrowings1Memberifrs-full:CurrencyRiskMember2026-03-310001004315currency:GBPnggtf:PreDerivativePositionMemberifrs-full:CurrencyRiskMember2026-03-310001004315currency:EURnggtf:PreDerivativePositionMemberifrs-full:CurrencyRiskMember2026-03-310001004315currency:USDnggtf:PreDerivativePositionMemberifrs-full:CurrencyRiskMember2026-03-310001004315srt:OtherCurrencyMembernggtf:PreDerivativePositionMemberifrs-full:CurrencyRiskMember2026-03-310001004315nggtf:PreDerivativePositionMemberifrs-full:CurrencyRiskMember2026-03-310001004315currency:GBPnggtf:FinancingAndInvestingDerivativesMemberifrs-full:CurrencyRiskMember2026-03-310001004315currency:EURnggtf:FinancingAndInvestingDerivativesMemberifrs-full:CurrencyRiskMember2026-03-310001004315currency:USDnggtf:FinancingAndInvestingDerivativesMemberifrs-full:CurrencyRiskMember2026-03-310001004315srt:OtherCurrencyMembernggtf:FinancingAndInvestingDerivativesMemberifrs-full:CurrencyRiskMember2026-03-310001004315nggtf:FinancingAndInvestingDerivativesMemberifrs-full:CurrencyRiskMember2026-03-310001004315ifrs-full:CurrencyRiskMembercurrency:GBP2026-03-310001004315ifrs-full:CurrencyRiskMembercurrency:EUR2026-03-310001004315ifrs-full:CurrencyRiskMembercurrency:USD2026-03-310001004315ifrs-full:CurrencyRiskMembersrt:OtherCurrencyMember2026-03-310001004315ifrs-full:CurrencyRiskMember2026-03-310001004315currency:GBPnggtf:CashAndCashEquivalents1Memberifrs-full:CurrencyRiskMember2025-03-310001004315currency:EURnggtf:CashAndCashEquivalents1Memberifrs-full:CurrencyRiskMember2025-03-310001004315currency:USDnggtf:CashAndCashEquivalents1Memberifrs-full:CurrencyRiskMember2025-03-310001004315srt:OtherCurrencyMembernggtf:CashAndCashEquivalents1Memberifrs-full:CurrencyRiskMember2025-03-310001004315nggtf:CashAndCashEquivalents1Memberifrs-full:CurrencyRiskMember2025-03-310001004315currency:GBPnggtf:FinancialInvestmentsMemberifrs-full:CurrencyRiskMember2025-03-310001004315currency:EURnggtf:FinancialInvestmentsMemberifrs-full:CurrencyRiskMember2025-03-310001004315currency:USDnggtf:FinancialInvestmentsMemberifrs-full:CurrencyRiskMember2025-03-310001004315srt:OtherCurrencyMembernggtf:FinancialInvestmentsMemberifrs-full:CurrencyRiskMember2025-03-310001004315nggtf:FinancialInvestmentsMemberifrs-full:CurrencyRiskMember2025-03-310001004315currency:GBPnggtf:Borrowings1Memberifrs-full:CurrencyRiskMember2025-03-310001004315currency:EURnggtf:Borrowings1Memberifrs-full:CurrencyRiskMember2025-03-310001004315currency:USDnggtf:Borrowings1Memberifrs-full:CurrencyRiskMember2025-03-310001004315srt:OtherCurrencyMembernggtf:Borrowings1Memberifrs-full:CurrencyRiskMember2025-03-310001004315nggtf:Borrowings1Memberifrs-full:CurrencyRiskMember2025-03-310001004315currency:GBPnggtf:PreDerivativePositionMemberifrs-full:CurrencyRiskMember2025-03-310001004315currency:EURnggtf:PreDerivativePositionMemberifrs-full:CurrencyRiskMember2025-03-310001004315currency:USDnggtf:PreDerivativePositionMemberifrs-full:CurrencyRiskMember2025-03-310001004315srt:OtherCurrencyMembernggtf:PreDerivativePositionMemberifrs-full:CurrencyRiskMember2025-03-310001004315nggtf:PreDerivativePositionMemberifrs-full:CurrencyRiskMember2025-03-310001004315currency:GBPnggtf:FinancingAndInvestingDerivativesMemberifrs-full:CurrencyRiskMember2025-03-310001004315currency:EURnggtf:FinancingAndInvestingDerivativesMemberifrs-full:CurrencyRiskMember2025-03-310001004315currency:USDnggtf:FinancingAndInvestingDerivativesMemberifrs-full:CurrencyRiskMember2025-03-310001004315srt:OtherCurrencyMembernggtf:FinancingAndInvestingDerivativesMemberifrs-full:CurrencyRiskMember2025-03-310001004315nggtf:FinancingAndInvestingDerivativesMemberifrs-full:CurrencyRiskMember2025-03-310001004315ifrs-full:CurrencyRiskMembercurrency:GBP2025-03-310001004315ifrs-full:CurrencyRiskMembercurrency:EUR2025-03-310001004315ifrs-full:CurrencyRiskMembercurrency:USD2025-03-310001004315ifrs-full:CurrencyRiskMembersrt:OtherCurrencyMember2025-03-310001004315ifrs-full:CurrencyRiskMember2025-03-310001004315currency:GBPnggtf:TradeandOtherReceivablesMemberifrs-full:CurrencyRiskMember2026-03-310001004315currency:EURnggtf:TradeandOtherReceivablesMemberifrs-full:CurrencyRiskMember2026-03-310001004315currency:USDnggtf:TradeandOtherReceivablesMemberifrs-full:CurrencyRiskMember2026-03-310001004315srt:OtherCurrencyMembernggtf:TradeandOtherReceivablesMemberifrs-full:CurrencyRiskMember2026-03-310001004315nggtf:TradeandOtherReceivablesMemberifrs-full:CurrencyRiskMember2026-03-310001004315currency:GBPnggtf:OtherNonCurrentAssetsMemberifrs-full:CurrencyRiskMember2026-03-310001004315currency:EURnggtf:OtherNonCurrentAssetsMemberifrs-full:CurrencyRiskMember2026-03-310001004315currency:USDnggtf:OtherNonCurrentAssetsMemberifrs-full:CurrencyRiskMember2026-03-310001004315srt:OtherCurrencyMembernggtf:OtherNonCurrentAssetsMemberifrs-full:CurrencyRiskMember2026-03-310001004315nggtf:OtherNonCurrentAssetsMemberifrs-full:CurrencyRiskMember2026-03-310001004315currency:GBPnggtf:TradeAndOtherPayablesMemberifrs-full:CurrencyRiskMember2026-03-310001004315currency:EURnggtf:TradeAndOtherPayablesMemberifrs-full:CurrencyRiskMember2026-03-310001004315currency:USDnggtf:TradeAndOtherPayablesMemberifrs-full:CurrencyRiskMember2026-03-310001004315srt:OtherCurrencyMembernggtf:TradeAndOtherPayablesMemberifrs-full:CurrencyRiskMember2026-03-310001004315nggtf:TradeAndOtherPayablesMemberifrs-full:CurrencyRiskMember2026-03-310001004315currency:GBPnggtf:OtherNonCurrentLiabilitiesMemberifrs-full:CurrencyRiskMember2026-03-310001004315currency:EURnggtf:OtherNonCurrentLiabilitiesMemberifrs-full:CurrencyRiskMember2026-03-310001004315currency:USDnggtf:OtherNonCurrentLiabilitiesMemberifrs-full:CurrencyRiskMember2026-03-310001004315srt:OtherCurrencyMembernggtf:OtherNonCurrentLiabilitiesMemberifrs-full:CurrencyRiskMember2026-03-310001004315nggtf:OtherNonCurrentLiabilitiesMemberifrs-full:CurrencyRiskMember2026-03-310001004315currency:GBPnggtf:TradeandOtherReceivablesMemberifrs-full:CurrencyRiskMember2025-03-310001004315currency:EURnggtf:TradeandOtherReceivablesMemberifrs-full:CurrencyRiskMember2025-03-310001004315currency:USDnggtf:TradeandOtherReceivablesMemberifrs-full:CurrencyRiskMember2025-03-310001004315srt:OtherCurrencyMembernggtf:TradeandOtherReceivablesMemberifrs-full:CurrencyRiskMember2025-03-310001004315nggtf:TradeandOtherReceivablesMemberifrs-full:CurrencyRiskMember2025-03-310001004315currency:GBPnggtf:OtherNonCurrentAssetsMemberifrs-full:CurrencyRiskMember2025-03-310001004315currency:EURnggtf:OtherNonCurrentAssetsMemberifrs-full:CurrencyRiskMember2025-03-310001004315currency:USDnggtf:OtherNonCurrentAssetsMemberifrs-full:CurrencyRiskMember2025-03-310001004315srt:OtherCurrencyMembernggtf:OtherNonCurrentAssetsMemberifrs-full:CurrencyRiskMember2025-03-310001004315nggtf:OtherNonCurrentAssetsMemberifrs-full:CurrencyRiskMember2025-03-310001004315currency:GBPnggtf:TradeAndOtherPayablesMemberifrs-full:CurrencyRiskMember2025-03-310001004315currency:EURnggtf:TradeAndOtherPayablesMemberifrs-full:CurrencyRiskMember2025-03-310001004315currency:USDnggtf:TradeAndOtherPayablesMemberifrs-full:CurrencyRiskMember2025-03-310001004315srt:OtherCurrencyMembernggtf:TradeAndOtherPayablesMemberifrs-full:CurrencyRiskMember2025-03-310001004315nggtf:TradeAndOtherPayablesMemberifrs-full:CurrencyRiskMember2025-03-310001004315currency:GBPnggtf:OtherNonCurrentLiabilitiesMemberifrs-full:CurrencyRiskMember2025-03-310001004315currency:EURnggtf:OtherNonCurrentLiabilitiesMemberifrs-full:CurrencyRiskMember2025-03-310001004315currency:USDnggtf:OtherNonCurrentLiabilitiesMemberifrs-full:CurrencyRiskMember2025-03-310001004315srt:OtherCurrencyMembernggtf:OtherNonCurrentLiabilitiesMemberifrs-full:CurrencyRiskMember2025-03-310001004315nggtf:OtherNonCurrentLiabilitiesMemberifrs-full:CurrencyRiskMember2025-03-310001004315nggtf:CashAndCashEquivalents1Memberifrs-full:FixedInterestRateMemberifrs-full:InterestRateRiskMember2026-03-310001004315nggtf:CashAndCashEquivalents1Memberifrs-full:FloatingInterestRateMemberifrs-full:InterestRateRiskMember2026-03-310001004315nggtf:CashAndCashEquivalents1Membernggtf:InflationLinkedInterestRateMemberifrs-full:InterestRateRiskMember2026-03-310001004315nggtf:CashAndCashEquivalents1Membernggtf:OtherInterestRateMemberifrs-full:InterestRateRiskMember2026-03-310001004315nggtf:CashAndCashEquivalents1Memberifrs-full:InterestRateRiskMember2026-03-310001004315nggtf:FinancialInvestmentsMemberifrs-full:FixedInterestRateMemberifrs-full:InterestRateRiskMember2026-03-310001004315nggtf:FinancialInvestmentsMemberifrs-full:FloatingInterestRateMemberifrs-full:InterestRateRiskMember2026-03-310001004315nggtf:FinancialInvestmentsMembernggtf:InflationLinkedInterestRateMemberifrs-full:InterestRateRiskMember2026-03-310001004315nggtf:FinancialInvestmentsMembernggtf:OtherInterestRateMemberifrs-full:InterestRateRiskMember2026-03-310001004315nggtf:FinancialInvestmentsMemberifrs-full:InterestRateRiskMember2026-03-310001004315nggtf:Borrowings1Memberifrs-full:FixedInterestRateMemberifrs-full:InterestRateRiskMember2026-03-310001004315nggtf:Borrowings1Memberifrs-full:FloatingInterestRateMemberifrs-full:InterestRateRiskMember2026-03-310001004315nggtf:Borrowings1Membernggtf:InflationLinkedInterestRateMemberifrs-full:InterestRateRiskMember2026-03-310001004315nggtf:Borrowings1Membernggtf:OtherInterestRateMemberifrs-full:InterestRateRiskMember2026-03-310001004315nggtf:Borrowings1Memberifrs-full:InterestRateRiskMember2026-03-310001004315nggtf:PreDerivativePositionMemberifrs-full:FixedInterestRateMemberifrs-full:InterestRateRiskMember2026-03-310001004315nggtf:PreDerivativePositionMemberifrs-full:FloatingInterestRateMemberifrs-full:InterestRateRiskMember2026-03-310001004315nggtf:PreDerivativePositionMembernggtf:InflationLinkedInterestRateMemberifrs-full:InterestRateRiskMember2026-03-310001004315nggtf:PreDerivativePositionMembernggtf:OtherInterestRateMemberifrs-full:InterestRateRiskMember2026-03-310001004315nggtf:PreDerivativePositionMemberifrs-full:InterestRateRiskMember2026-03-310001004315nggtf:FinancingAndInvestingDerivativesMemberifrs-full:FixedInterestRateMemberifrs-full:InterestRateRiskMember2026-03-310001004315nggtf:FinancingAndInvestingDerivativesMemberifrs-full:FloatingInterestRateMemberifrs-full:InterestRateRiskMember2026-03-310001004315nggtf:FinancingAndInvestingDerivativesMembernggtf:InflationLinkedInterestRateMemberifrs-full:InterestRateRiskMember2026-03-310001004315nggtf:FinancingAndInvestingDerivativesMembernggtf:OtherInterestRateMemberifrs-full:InterestRateRiskMember2026-03-310001004315nggtf:FinancingAndInvestingDerivativesMemberifrs-full:InterestRateRiskMember2026-03-310001004315ifrs-full:FixedInterestRateMemberifrs-full:InterestRateRiskMember2026-03-310001004315ifrs-full:FloatingInterestRateMemberifrs-full:InterestRateRiskMember2026-03-310001004315nggtf:InflationLinkedInterestRateMemberifrs-full:InterestRateRiskMember2026-03-310001004315nggtf:OtherInterestRateMemberifrs-full:InterestRateRiskMember2026-03-310001004315ifrs-full:InterestRateRiskMember2026-03-310001004315nggtf:CashAndCashEquivalents1Memberifrs-full:FixedInterestRateMemberifrs-full:InterestRateRiskMember2025-03-310001004315nggtf:CashAndCashEquivalents1Memberifrs-full:FloatingInterestRateMemberifrs-full:InterestRateRiskMember2025-03-310001004315nggtf:CashAndCashEquivalents1Membernggtf:InflationLinkedInterestRateMemberifrs-full:InterestRateRiskMember2025-03-310001004315nggtf:CashAndCashEquivalents1Membernggtf:OtherInterestRateMemberifrs-full:InterestRateRiskMember2025-03-310001004315nggtf:CashAndCashEquivalents1Memberifrs-full:InterestRateRiskMember2025-03-310001004315nggtf:FinancialInvestmentsMemberifrs-full:FixedInterestRateMemberifrs-full:InterestRateRiskMember2025-03-310001004315nggtf:FinancialInvestmentsMemberifrs-full:FloatingInterestRateMemberifrs-full:InterestRateRiskMember2025-03-310001004315nggtf:FinancialInvestmentsMembernggtf:InflationLinkedInterestRateMemberifrs-full:InterestRateRiskMember2025-03-310001004315nggtf:FinancialInvestmentsMembernggtf:OtherInterestRateMemberifrs-full:InterestRateRiskMember2025-03-310001004315nggtf:FinancialInvestmentsMemberifrs-full:InterestRateRiskMember2025-03-310001004315nggtf:Borrowings1Memberifrs-full:FixedInterestRateMemberifrs-full:InterestRateRiskMember2025-03-310001004315nggtf:Borrowings1Memberifrs-full:FloatingInterestRateMemberifrs-full:InterestRateRiskMember2025-03-310001004315nggtf:Borrowings1Membernggtf:InflationLinkedInterestRateMemberifrs-full:InterestRateRiskMember2025-03-310001004315nggtf:Borrowings1Membernggtf:OtherInterestRateMemberifrs-full:InterestRateRiskMember2025-03-310001004315nggtf:Borrowings1Memberifrs-full:InterestRateRiskMember2025-03-310001004315nggtf:PreDerivativePositionMemberifrs-full:FixedInterestRateMemberifrs-full:InterestRateRiskMember2025-03-310001004315nggtf:PreDerivativePositionMemberifrs-full:FloatingInterestRateMemberifrs-full:InterestRateRiskMember2025-03-310001004315nggtf:PreDerivativePositionMembernggtf:InflationLinkedInterestRateMemberifrs-full:InterestRateRiskMember2025-03-310001004315nggtf:PreDerivativePositionMembernggtf:OtherInterestRateMemberifrs-full:InterestRateRiskMember2025-03-310001004315nggtf:PreDerivativePositionMemberifrs-full:InterestRateRiskMember2025-03-310001004315nggtf:FinancingAndInvestingDerivativesMemberifrs-full:FixedInterestRateMemberifrs-full:InterestRateRiskMember2025-03-310001004315nggtf:FinancingAndInvestingDerivativesMemberifrs-full:FloatingInterestRateMemberifrs-full:InterestRateRiskMember2025-03-310001004315nggtf:FinancingAndInvestingDerivativesMembernggtf:InflationLinkedInterestRateMemberifrs-full:InterestRateRiskMember2025-03-310001004315nggtf:FinancingAndInvestingDerivativesMembernggtf:OtherInterestRateMemberifrs-full:InterestRateRiskMember2025-03-310001004315nggtf:FinancingAndInvestingDerivativesMemberifrs-full:InterestRateRiskMember2025-03-310001004315ifrs-full:FixedInterestRateMemberifrs-full:InterestRateRiskMember2025-03-310001004315ifrs-full:FloatingInterestRateMemberifrs-full:InterestRateRiskMember2025-03-310001004315nggtf:InflationLinkedInterestRateMemberifrs-full:InterestRateRiskMember2025-03-310001004315nggtf:OtherInterestRateMemberifrs-full:InterestRateRiskMember2025-03-310001004315ifrs-full:InterestRateRiskMember2025-03-310001004315ifrs-full:MarketRiskMemberifrs-full:FairValueHedgesMember2025-04-012026-03-310001004315ifrs-full:MarketRiskMemberifrs-full:CashFlowHedgesMember2025-04-012026-03-310001004315ifrs-full:CurrencyRiskMemberifrs-full:CashFlowHedgesMember2025-04-012026-03-310001004315ifrs-full:HedgesOfNetInvestmentInForeignOperationsMember2025-04-012026-03-310001004315nggtf:ReserveOfCostOfHedgingMemberifrs-full:MarketRiskMemberifrs-full:FairValueHedgesMember2026-03-310001004315nggtf:ReserveOfCostOfHedgingMemberifrs-full:MarketRiskMemberifrs-full:CashFlowHedgesMember2026-03-310001004315nggtf:ReserveOfCostOfHedgingMemberifrs-full:CurrencyRiskMemberifrs-full:CashFlowHedgesMember2026-03-310001004315nggtf:ReserveOfCostOfHedgingMemberifrs-full:HedgesOfNetInvestmentInForeignOperationsMember2026-03-310001004315ifrs-full:LongtermBorrowingsMembernggtf:NonDerivativeHedgingInstrumentMemberifrs-full:MarketRiskMemberifrs-full:FairValueHedgesMember2026-03-310001004315ifrs-full:LongtermBorrowingsMembernggtf:NonDerivativeHedgingInstrumentMemberifrs-full:MarketRiskMemberifrs-full:CashFlowHedgesMember2026-03-310001004315ifrs-full:LongtermBorrowingsMembernggtf:NonDerivativeHedgingInstrumentMemberifrs-full:CurrencyRiskMemberifrs-full:CashFlowHedgesMember2026-03-310001004315ifrs-full:LongtermBorrowingsMembernggtf:NonDerivativeHedgingInstrumentMemberifrs-full:HedgesOfNetInvestmentInForeignOperationsMember2026-03-310001004315nggtf:CurrentDerivativeMembernggtf:DerivativeHedgingInstrumentMemberifrs-full:MarketRiskMemberifrs-full:FairValueHedgesMember2026-03-310001004315nggtf:CurrentDerivativeMembernggtf:DerivativeHedgingInstrumentMemberifrs-full:MarketRiskMemberifrs-full:CashFlowHedgesMember2026-03-310001004315nggtf:CurrentDerivativeMembernggtf:DerivativeHedgingInstrumentMemberifrs-full:CurrencyRiskMemberifrs-full:CashFlowHedgesMember2026-03-310001004315nggtf:CurrentDerivativeMembernggtf:DerivativeHedgingInstrumentMemberifrs-full:HedgesOfNetInvestmentInForeignOperationsMember2026-03-310001004315nggtf:NonCurrentDerivativeMembernggtf:DerivativeHedgingInstrumentMemberifrs-full:MarketRiskMemberifrs-full:FairValueHedgesMember2026-03-310001004315nggtf:NonCurrentDerivativeMembernggtf:DerivativeHedgingInstrumentMemberifrs-full:MarketRiskMemberifrs-full:CashFlowHedgesMember2026-03-310001004315nggtf:NonCurrentDerivativeMembernggtf:DerivativeHedgingInstrumentMemberifrs-full:CurrencyRiskMemberifrs-full:CashFlowHedgesMember2026-03-310001004315nggtf:NonCurrentDerivativeMembernggtf:DerivativeHedgingInstrumentMemberifrs-full:HedgesOfNetInvestmentInForeignOperationsMember2026-03-310001004315nggtf:CurrentDerivativeFinancialLiabilitiesMembernggtf:DerivativeHedgingInstrumentMemberifrs-full:MarketRiskMemberifrs-full:FairValueHedgesMember2026-03-310001004315nggtf:CurrentDerivativeFinancialLiabilitiesMembernggtf:DerivativeHedgingInstrumentMemberifrs-full:MarketRiskMemberifrs-full:CashFlowHedgesMember2026-03-310001004315nggtf:CurrentDerivativeFinancialLiabilitiesMembernggtf:DerivativeHedgingInstrumentMemberifrs-full:CurrencyRiskMemberifrs-full:CashFlowHedgesMember2026-03-310001004315nggtf:CurrentDerivativeFinancialLiabilitiesMembernggtf:DerivativeHedgingInstrumentMemberifrs-full:HedgesOfNetInvestmentInForeignOperationsMember2026-03-310001004315nggtf:NonCurrentDerivativeFinancialLiabilitiesMembernggtf:DerivativeHedgingInstrumentMemberifrs-full:MarketRiskMemberifrs-full:FairValueHedgesMember2026-03-310001004315nggtf:NonCurrentDerivativeFinancialLiabilitiesMembernggtf:DerivativeHedgingInstrumentMemberifrs-full:MarketRiskMemberifrs-full:CashFlowHedgesMember2026-03-310001004315nggtf:NonCurrentDerivativeFinancialLiabilitiesMembernggtf:DerivativeHedgingInstrumentMemberifrs-full:CurrencyRiskMemberifrs-full:CashFlowHedgesMember2026-03-310001004315nggtf:NonCurrentDerivativeFinancialLiabilitiesMembernggtf:DerivativeHedgingInstrumentMemberifrs-full:HedgesOfNetInvestmentInForeignOperationsMember2026-03-310001004315ifrs-full:MarketRiskMemberifrs-full:BottomOfRangeMemberifrs-full:CashFlowHedgesMember2026-03-310001004315ifrs-full:MarketRiskMemberifrs-full:TopOfRangeMemberifrs-full:CashFlowHedgesMember2026-03-310001004315ifrs-full:CurrencyRiskMemberifrs-full:BottomOfRangeMemberifrs-full:CashFlowHedgesMember2026-03-310001004315ifrs-full:CurrencyRiskMemberifrs-full:TopOfRangeMemberifrs-full:CashFlowHedgesMember2026-03-310001004315ifrs-full:BottomOfRangeMemberifrs-full:HedgesOfNetInvestmentInForeignOperationsMember2026-03-310001004315ifrs-full:TopOfRangeMemberifrs-full:HedgesOfNetInvestmentInForeignOperationsMember2026-03-310001004315ifrs-full:MarketRiskMemberifrs-full:BottomOfRangeMemberifrs-full:FairValueHedgesMember2026-03-310001004315ifrs-full:MarketRiskMemberifrs-full:TopOfRangeMemberifrs-full:FairValueHedgesMember2026-03-310001004315nggtf:SterlingOvernightIndexAverageSONIAMemberifrs-full:MarketRiskMemberifrs-full:FairValueHedgesMembercurrency:GBPifrs-full:BottomOfRangeMember2026-03-310001004315nggtf:SterlingOvernightIndexAverageSONIAMemberifrs-full:MarketRiskMemberifrs-full:FairValueHedgesMembercurrency:GBPifrs-full:TopOfRangeMember2026-03-310001004315currency:GBPifrs-full:MarketRiskMemberifrs-full:BottomOfRangeMemberifrs-full:CashFlowHedgesMember2026-03-310001004315currency:GBPifrs-full:MarketRiskMemberifrs-full:TopOfRangeMemberifrs-full:CashFlowHedgesMember2026-03-310001004315nggtf:SecuredOvernightFinancingRateSOFRMemberifrs-full:MarketRiskMemberifrs-full:FairValueHedgesMembercurrency:USDifrs-full:BottomOfRangeMember2026-03-310001004315nggtf:SecuredOvernightFinancingRateSOFRMemberifrs-full:MarketRiskMemberifrs-full:FairValueHedgesMembercurrency:USDifrs-full:TopOfRangeMember2026-03-310001004315currency:USDifrs-full:MarketRiskMemberifrs-full:BottomOfRangeMemberifrs-full:CashFlowHedgesMember2026-03-310001004315currency:USDifrs-full:MarketRiskMemberifrs-full:TopOfRangeMemberifrs-full:CashFlowHedgesMember2026-03-310001004315ifrs-full:MarketRiskMemberifrs-full:FairValueHedgesMember2024-04-012025-03-310001004315ifrs-full:MarketRiskMemberifrs-full:CashFlowHedgesMember2024-04-012025-03-310001004315ifrs-full:CurrencyRiskMemberifrs-full:CashFlowHedgesMember2024-04-012025-03-310001004315ifrs-full:HedgesOfNetInvestmentInForeignOperationsMember2024-04-012025-03-310001004315nggtf:ReserveOfCostOfHedgingMemberifrs-full:MarketRiskMemberifrs-full:FairValueHedgesMember2025-03-310001004315nggtf:ReserveOfCostOfHedgingMemberifrs-full:MarketRiskMemberifrs-full:CashFlowHedgesMember2025-03-310001004315nggtf:ReserveOfCostOfHedgingMemberifrs-full:CurrencyRiskMemberifrs-full:CashFlowHedgesMember2025-03-310001004315nggtf:ReserveOfCostOfHedgingMemberifrs-full:HedgesOfNetInvestmentInForeignOperationsMember2025-03-310001004315ifrs-full:LongtermBorrowingsMembernggtf:NonDerivativeHedgingInstrumentMemberifrs-full:MarketRiskMemberifrs-full:FairValueHedgesMember2025-03-310001004315ifrs-full:LongtermBorrowingsMembernggtf:NonDerivativeHedgingInstrumentMemberifrs-full:MarketRiskMemberifrs-full:CashFlowHedgesMember2025-03-310001004315ifrs-full:LongtermBorrowingsMembernggtf:NonDerivativeHedgingInstrumentMemberifrs-full:CurrencyRiskMemberifrs-full:CashFlowHedgesMember2025-03-310001004315ifrs-full:LongtermBorrowingsMembernggtf:NonDerivativeHedgingInstrumentMemberifrs-full:HedgesOfNetInvestmentInForeignOperationsMember2025-03-310001004315nggtf:CurrentDerivativeMemberifrs-full:MarketRiskMemberifrs-full:FairValueHedgesMember2025-03-310001004315nggtf:CurrentDerivativeMemberifrs-full:MarketRiskMemberifrs-full:CashFlowHedgesMember2025-03-310001004315nggtf:CurrentDerivativeMemberifrs-full:CurrencyRiskMemberifrs-full:CashFlowHedgesMember2025-03-310001004315nggtf:CurrentDerivativeMemberifrs-full:HedgesOfNetInvestmentInForeignOperationsMember2025-03-310001004315nggtf:NonCurrentDerivativeMemberifrs-full:MarketRiskMemberifrs-full:FairValueHedgesMember2025-03-310001004315nggtf:NonCurrentDerivativeMemberifrs-full:MarketRiskMemberifrs-full:CashFlowHedgesMember2025-03-310001004315nggtf:NonCurrentDerivativeMemberifrs-full:CurrencyRiskMemberifrs-full:CashFlowHedgesMember2025-03-310001004315nggtf:NonCurrentDerivativeMemberifrs-full:HedgesOfNetInvestmentInForeignOperationsMember2025-03-310001004315nggtf:CurrentDerivativeFinancialLiabilitiesMemberifrs-full:MarketRiskMemberifrs-full:FairValueHedgesMember2025-03-310001004315nggtf:CurrentDerivativeFinancialLiabilitiesMemberifrs-full:MarketRiskMemberifrs-full:CashFlowHedgesMember2025-03-310001004315nggtf:CurrentDerivativeFinancialLiabilitiesMemberifrs-full:CurrencyRiskMemberifrs-full:CashFlowHedgesMember2025-03-310001004315nggtf:CurrentDerivativeFinancialLiabilitiesMemberifrs-full:HedgesOfNetInvestmentInForeignOperationsMember2025-03-310001004315nggtf:NonCurrentDerivativeFinancialLiabilitiesMemberifrs-full:MarketRiskMemberifrs-full:FairValueHedgesMember2025-03-310001004315nggtf:NonCurrentDerivativeFinancialLiabilitiesMemberifrs-full:MarketRiskMemberifrs-full:CashFlowHedgesMember2025-03-310001004315nggtf:NonCurrentDerivativeFinancialLiabilitiesMemberifrs-full:CurrencyRiskMemberifrs-full:CashFlowHedgesMember2025-03-310001004315nggtf:NonCurrentDerivativeFinancialLiabilitiesMemberifrs-full:HedgesOfNetInvestmentInForeignOperationsMember2025-03-310001004315ifrs-full:MarketRiskMemberifrs-full:BottomOfRangeMemberifrs-full:CashFlowHedgesMember2025-03-310001004315ifrs-full:MarketRiskMemberifrs-full:TopOfRangeMemberifrs-full:CashFlowHedgesMember2025-03-310001004315ifrs-full:CurrencyRiskMemberifrs-full:BottomOfRangeMemberifrs-full:CashFlowHedgesMember2025-03-310001004315ifrs-full:CurrencyRiskMemberifrs-full:TopOfRangeMemberifrs-full:CashFlowHedgesMember2025-03-310001004315ifrs-full:BottomOfRangeMemberifrs-full:HedgesOfNetInvestmentInForeignOperationsMember2025-03-310001004315ifrs-full:TopOfRangeMemberifrs-full:HedgesOfNetInvestmentInForeignOperationsMember2025-03-310001004315ifrs-full:MarketRiskMemberifrs-full:BottomOfRangeMemberifrs-full:FairValueHedgesMember2025-03-310001004315ifrs-full:MarketRiskMemberifrs-full:TopOfRangeMemberifrs-full:FairValueHedgesMember2025-03-310001004315nggtf:SterlingOvernightIndexAverageSONIAMemberifrs-full:MarketRiskMemberifrs-full:FairValueHedgesMembercurrency:GBPifrs-full:BottomOfRangeMember2025-03-310001004315nggtf:SterlingOvernightIndexAverageSONIAMemberifrs-full:MarketRiskMemberifrs-full:FairValueHedgesMembercurrency:GBPifrs-full:TopOfRangeMember2025-03-310001004315currency:GBPifrs-full:MarketRiskMemberifrs-full:BottomOfRangeMemberifrs-full:CashFlowHedgesMember2025-03-310001004315currency:GBPifrs-full:MarketRiskMemberifrs-full:TopOfRangeMemberifrs-full:CashFlowHedgesMember2025-03-310001004315nggtf:SecuredOvernightFinancingRateSOFRMemberifrs-full:MarketRiskMemberifrs-full:FairValueHedgesMembercurrency:USDifrs-full:BottomOfRangeMember2025-03-310001004315nggtf:SecuredOvernightFinancingRateSOFRMemberifrs-full:MarketRiskMemberifrs-full:FairValueHedgesMembercurrency:USDifrs-full:TopOfRangeMember2025-03-310001004315currency:USDifrs-full:MarketRiskMemberifrs-full:BottomOfRangeMemberifrs-full:CashFlowHedgesMember2025-03-310001004315currency:USDifrs-full:MarketRiskMemberifrs-full:TopOfRangeMemberifrs-full:CashFlowHedgesMember2025-03-310001004315ifrs-full:MarketRiskMemberifrs-full:FairValueHedgesMember2026-03-310001004315nggtf:Borrowings1Memberifrs-full:MarketRiskMemberifrs-full:FairValueHedgesMember2026-03-310001004315nggtf:CurrentLiabilitiesMembernggtf:Borrowings1Memberifrs-full:MarketRiskMemberifrs-full:FairValueHedgesMember2026-03-310001004315nggtf:NonCurrentLiabilitiesMembernggtf:Borrowings1Memberifrs-full:MarketRiskMemberifrs-full:FairValueHedgesMember2026-03-310001004315ifrs-full:MarketRiskMemberifrs-full:FairValueHedgesMember2025-03-310001004315nggtf:Borrowings1Memberifrs-full:MarketRiskMemberifrs-full:FairValueHedgesMember2025-03-310001004315nggtf:CurrentLiabilitiesMembernggtf:Borrowings1Memberifrs-full:MarketRiskMemberifrs-full:FairValueHedgesMember2025-03-310001004315nggtf:NonCurrentLiabilitiesMembernggtf:Borrowings1Memberifrs-full:MarketRiskMemberifrs-full:FairValueHedgesMember2025-03-310001004315ifrs-full:MarketRiskMemberifrs-full:CashFlowHedgesMember2026-03-310001004315ifrs-full:CurrencyRiskMemberifrs-full:CashFlowHedgesMember2026-03-310001004315ifrs-full:MarketRiskMemberifrs-full:CashFlowHedgesMember2025-03-310001004315ifrs-full:CurrencyRiskMemberifrs-full:CashFlowHedgesMember2025-03-310001004315ifrs-full:CurrencyRiskMemberifrs-full:HedgesOfNetInvestmentInForeignOperationsMember2026-03-310001004315ifrs-full:CurrencyRiskMemberifrs-full:HedgesOfNetInvestmentInForeignOperationsMember2025-04-012026-03-310001004315ifrs-full:CurrencyRiskMemberifrs-full:HedgesOfNetInvestmentInForeignOperationsMember2025-03-310001004315ifrs-full:CurrencyRiskMemberifrs-full:HedgesOfNetInvestmentInForeignOperationsMember2024-04-012025-03-310001004315ifrs-full:Level1OfFairValueHierarchyMembernggtf:InvestmentsHeldAtFVTPLMember2026-03-310001004315ifrs-full:Level2OfFairValueHierarchyMembernggtf:InvestmentsHeldAtFVTPLMember2026-03-310001004315ifrs-full:Level3OfFairValueHierarchyMembernggtf:InvestmentsHeldAtFVTPLMember2026-03-310001004315nggtf:InvestmentsHeldAtFVTPLMember2026-03-310001004315ifrs-full:Level1OfFairValueHierarchyMembernggtf:InvestmentsHeldAtFVTPLMember2025-03-310001004315ifrs-full:Level2OfFairValueHierarchyMembernggtf:InvestmentsHeldAtFVTPLMember2025-03-310001004315ifrs-full:Level3OfFairValueHierarchyMembernggtf:InvestmentsHeldAtFVTPLMember2025-03-310001004315nggtf:InvestmentsHeldAtFVTPLMember2025-03-310001004315ifrs-full:Level1OfFairValueHierarchyMembernggtf:InvestmentsHeldAtFVTOCIMember2026-03-310001004315ifrs-full:Level2OfFairValueHierarchyMembernggtf:InvestmentsHeldAtFVTOCIMember2026-03-310001004315ifrs-full:Level3OfFairValueHierarchyMembernggtf:InvestmentsHeldAtFVTOCIMember2026-03-310001004315nggtf:InvestmentsHeldAtFVTOCIMember2026-03-310001004315ifrs-full:Level1OfFairValueHierarchyMembernggtf:InvestmentsHeldAtFVTOCIMember2025-03-310001004315ifrs-full:Level2OfFairValueHierarchyMembernggtf:InvestmentsHeldAtFVTOCIMember2025-03-310001004315ifrs-full:Level3OfFairValueHierarchyMembernggtf:InvestmentsHeldAtFVTOCIMember2025-03-310001004315nggtf:InvestmentsHeldAtFVTOCIMember2025-03-310001004315ifrs-full:Level1OfFairValueHierarchyMembernggtf:FinancingDerivativesMember2026-03-310001004315ifrs-full:Level2OfFairValueHierarchyMembernggtf:FinancingDerivativesMember2026-03-310001004315ifrs-full:Level3OfFairValueHierarchyMembernggtf:FinancingDerivativesMember2026-03-310001004315nggtf:FinancingDerivativesMember2026-03-310001004315ifrs-full:Level1OfFairValueHierarchyMembernggtf:FinancingDerivativesMember2025-03-310001004315ifrs-full:Level2OfFairValueHierarchyMembernggtf:FinancingDerivativesMember2025-03-310001004315ifrs-full:Level3OfFairValueHierarchyMembernggtf:FinancingDerivativesMember2025-03-310001004315nggtf:FinancingDerivativesMember2025-03-310001004315ifrs-full:Level1OfFairValueHierarchyMembernggtf:CommodityDerivativesMember2026-03-310001004315ifrs-full:Level2OfFairValueHierarchyMembernggtf:CommodityDerivativesMember2026-03-310001004315ifrs-full:Level3OfFairValueHierarchyMembernggtf:CommodityDerivativesMember2026-03-310001004315nggtf:CommodityDerivativesMember2026-03-310001004315ifrs-full:Level1OfFairValueHierarchyMembernggtf:CommodityDerivativesMember2025-03-310001004315ifrs-full:Level2OfFairValueHierarchyMembernggtf:CommodityDerivativesMember2025-03-310001004315ifrs-full:Level3OfFairValueHierarchyMembernggtf:CommodityDerivativesMember2025-03-310001004315nggtf:CommodityDerivativesMember2025-03-310001004315ifrs-full:Level1OfFairValueHierarchyMember2026-03-310001004315ifrs-full:Level2OfFairValueHierarchyMember2026-03-310001004315ifrs-full:Level3OfFairValueHierarchyMember2026-03-310001004315ifrs-full:Level1OfFairValueHierarchyMember2025-03-310001004315ifrs-full:Level2OfFairValueHierarchyMember2025-03-310001004315ifrs-full:Level3OfFairValueHierarchyMember2025-03-310001004315ifrs-full:Level1OfFairValueHierarchyMembernggtf:FinancingDerivativesMember2026-03-310001004315ifrs-full:Level2OfFairValueHierarchyMembernggtf:FinancingDerivativesMember2026-03-310001004315ifrs-full:Level3OfFairValueHierarchyMembernggtf:FinancingDerivativesMember2026-03-310001004315nggtf:FinancingDerivativesMember2026-03-310001004315ifrs-full:Level1OfFairValueHierarchyMembernggtf:FinancingDerivativesMember2025-03-310001004315ifrs-full:Level2OfFairValueHierarchyMembernggtf:FinancingDerivativesMember2025-03-310001004315ifrs-full:Level3OfFairValueHierarchyMembernggtf:FinancingDerivativesMember2025-03-310001004315nggtf:FinancingDerivativesMember2025-03-310001004315ifrs-full:Level1OfFairValueHierarchyMembernggtf:CommodityDerivativesMember2026-03-310001004315ifrs-full:Level2OfFairValueHierarchyMembernggtf:CommodityDerivativesMember2026-03-310001004315ifrs-full:Level3OfFairValueHierarchyMembernggtf:CommodityDerivativesMember2026-03-310001004315nggtf:CommodityDerivativesMember2026-03-310001004315ifrs-full:Level1OfFairValueHierarchyMembernggtf:CommodityDerivativesMember2025-03-310001004315ifrs-full:Level2OfFairValueHierarchyMembernggtf:CommodityDerivativesMember2025-03-310001004315ifrs-full:Level3OfFairValueHierarchyMembernggtf:CommodityDerivativesMember2025-03-310001004315nggtf:CommodityDerivativesMember2025-03-310001004315nggtf:FinancingDerivativesMemberifrs-full:Level3OfFairValueHierarchyMember2025-03-310001004315nggtf:FinancingDerivativesMemberifrs-full:Level3OfFairValueHierarchyMember2024-03-310001004315nggtf:CommodityDerivativesMemberifrs-full:Level3OfFairValueHierarchyMember2025-03-310001004315nggtf:CommodityDerivativesMemberifrs-full:Level3OfFairValueHierarchyMember2024-03-310001004315nggtf:InvestmentsHeldAtFVTPLMemberifrs-full:Level3OfFairValueHierarchyMember2025-03-310001004315nggtf:InvestmentsHeldAtFVTPLMemberifrs-full:Level3OfFairValueHierarchyMember2024-03-310001004315ifrs-full:Level3OfFairValueHierarchyMember2024-03-310001004315nggtf:FinancingDerivativesMemberifrs-full:Level3OfFairValueHierarchyMember2025-04-012026-03-310001004315nggtf:FinancingDerivativesMemberifrs-full:Level3OfFairValueHierarchyMember2024-04-012025-03-310001004315nggtf:CommodityDerivativesMemberifrs-full:Level3OfFairValueHierarchyMember2025-04-012026-03-310001004315nggtf:CommodityDerivativesMemberifrs-full:Level3OfFairValueHierarchyMember2024-04-012025-03-310001004315nggtf:InvestmentsHeldAtFVTPLMemberifrs-full:Level3OfFairValueHierarchyMember2025-04-012026-03-310001004315nggtf:InvestmentsHeldAtFVTPLMemberifrs-full:Level3OfFairValueHierarchyMember2024-04-012025-03-310001004315ifrs-full:Level3OfFairValueHierarchyMember2025-04-012026-03-310001004315ifrs-full:Level3OfFairValueHierarchyMember2024-04-012025-03-310001004315nggtf:FinancingDerivativesMemberifrs-full:Level3OfFairValueHierarchyMember2026-03-310001004315nggtf:CommodityDerivativesMemberifrs-full:Level3OfFairValueHierarchyMember2026-03-310001004315nggtf:InvestmentsHeldAtFVTPLMemberifrs-full:Level3OfFairValueHierarchyMember2026-03-310001004315nggtf:CommodityDerivativesMembernggtf:CommodityPriceRiskTenPercentIncreaseMember2026-03-310001004315nggtf:CommodityDerivativesMembernggtf:CommodityPriceRiskTenPercentIncreaseMember2025-03-310001004315nggtf:CommodityDerivativesMembernggtf:CommodityPriceRiskTenPercentDecreaseMember2026-03-310001004315nggtf:CommodityDerivativesMembernggtf:CommodityPriceRiskTenPercentDecreaseMember2025-03-310001004315nggtf:CommodityDerivativesMembernggtf:MarketAreaPriceRiskTenPercentIncreaseMember2026-03-310001004315nggtf:CommodityDerivativesMembernggtf:MarketAreaPriceRiskTenPercentDecreaseMember2026-03-310001004315nggtf:FinancingDerivativesMembernggtf:MarketRiskLimitedPriceInflationMarketCurveTwentyBasisPointsIncreaseMember2026-03-310001004315nggtf:FinancingDerivativesMembernggtf:MarketRiskLimitedPriceInflationMarketCurveTwentyBasisPointsIncreaseMember2025-03-310001004315nggtf:FinancingDerivativesMembernggtf:MarketRiskLimitedPriceInflationMarketCurveTwentyBasisPointsDecreaseMember2026-03-310001004315nggtf:FinancingDerivativesMembernggtf:MarketRiskLimitedPriceInflationMarketCurveTwentyBasisPointsDecreaseMember2025-03-310001004315nggtf:FinancingDerivativesMembernggtf:MarketRiskRetailPriceIndexConsumerPriceIndexTwentyBasisPointsIncreaseMember2026-03-310001004315nggtf:FinancingDerivativesMembernggtf:MarketRiskRetailPriceIndexConsumerPriceIndexTwentyBasisPointsIncreaseMember2025-03-310001004315nggtf:FinancingDerivativesMembernggtf:MarketRiskRetailPriceIndexConsumerPriceIndexTwentyBasisPointsDecreaseMember2026-03-310001004315nggtf:FinancingDerivativesMembernggtf:MarketRiskRetailPriceIndexConsumerPriceIndexTwentyBasisPointsDecreaseMember2025-03-310001004315nggtf:OtherFinancialInstrumentsMembernggtf:DiscountRateRiskFiftyBasisPointsIncreaseMember2026-03-310001004315nggtf:OtherFinancialInstrumentsMembernggtf:DiscountRateRiskFiftyBasisPointsIncreaseMember2025-03-310001004315nggtf:OtherFinancialInstrumentsMembernggtf:DiscountRateRiskFiftyBasisPointsDecreaseMember2026-03-310001004315nggtf:OtherFinancialInstrumentsMembernggtf:DiscountRateRiskFiftyBasisPointsDecreaseMember2025-03-310001004315nggtf:OtherFinancialInstrumentsMembernggtf:VentureCapitalPriceTenPercentIncreaseMember2026-03-310001004315nggtf:OtherFinancialInstrumentsMembernggtf:VentureCapitalPriceTenPercentIncreaseMember2025-03-310001004315nggtf:OtherFinancialInstrumentsMembernggtf:VentureCapitalPriceTenPercentDecreaseMember2026-03-310001004315nggtf:OtherFinancialInstrumentsMembernggtf:VentureCapitalPriceTenPercentDecreaseMember2025-03-310001004315nggtf:NonUSSubsidiariesMember2026-03-310001004315nggtf:USSubsidiariesMember2026-03-310001004315nggtf:USAndNonUSSubsidiariesMember2026-03-310001004315srt:MaximumMembernggtf:NationalGridElectricityDistributionGroupMember2026-03-310001004315nggtf:NationalGridElectricityDistributionGroupMember2026-03-310001004315nggtf:FacilitiesHeldAsBackupToCommercialPaperAndSimilarBorrowingsMember2026-03-310001004315nggtf:FacilitiesHeldAsBackupToCommercialPaperAndSimilarBorrowingsMember2025-03-310001004315nggtf:FacilitiesAvailableAsBackupToSpecificUSBorrowingsMember2026-03-310001004315nggtf:FacilitiesAvailableAsBackupToSpecificUSBorrowingsMember2025-03-310001004315nggtf:ExtensionOfTermOfBorrowingFacilitiesMemberifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMember2026-06-030001004315nggtf:SheetRoadManagementCompanyLimitedMember2025-04-012026-03-310001004315nggtf:WarwickTechnologyParkManagementCompanyNo2LimitedMember2025-04-012026-03-310001004315nggtf:NewEnglandHydroFinanceCompanyInc.Member2025-04-012026-03-310001004315nggtf:NewEnglandHydroTransmissionElectricCompanyInc.Member2025-04-012026-03-310001004315nggtf:NewEnglandHydroTransmissionCorporationMember2025-04-012026-03-310001004315nggtf:BritNedDevelopmentLimitedMembernggtf:COrdinarySharesMembernggtf:NationalGridInterconnectorHoldingsLimitedMember2026-03-310001004315nggtf:BritNedDevelopmentLimitedMembernggtf:AOrdinarySharesMembernggtf:NationalGridInterconnectorHoldingsLimitedMember2026-03-310001004315nggtf:NationalPlacesLLPMember2025-04-012026-03-310001004315nggtf:NationalGridInterconnectorHoldingsLimitedMembernggtf:NemoLinkLimitedMember2026-03-310001004315nggtf:CommunityOffshoreWindLLCMember2025-04-012026-03-310001004315nggtf:LIEnergyStorageSystemLLCMember2025-04-012026-03-310001004315nggtf:LISolarGenerationLLCMember2025-04-012026-03-310001004315nggtf:EasternGreenLink1LimitedMember2025-04-012026-03-310001004315nggtf:EasternGreenLink1LimitedMembernggtf:AOrdinarySharesMembernggtf:NationalGridElectricityTransmissionplcMember2026-03-310001004315nggtf:EasternGreenLink2LimitedMember2025-04-012026-03-310001004315nggtf:EasternGreenLink2LimitedMembernggtf:BOrdinarySharesMembernggtf:NationalGridElectricityTransmissionplcMember2026-03-310001004315nggtf:EasternGreenLink3LimitedMember2025-04-012026-03-310001004315nggtf:EasternGreenLink3LimitedMembernggtf:BOrdinarySharesMembernggtf:NationalGridElectricityTransmissionplcMember2026-03-310001004315nggtf:EasternGreenLink4LimitedMember2025-04-012026-03-310001004315nggtf:EasternGreenLink4LimitedMembernggtf:AOrdinarySharesMembernggtf:NationalGridElectricityTransmissionplcMember2026-03-310001004315nggtf:NGETSPTUpgradesLimitedMember2025-04-012026-03-310001004315nggtf:NGETSPTUpgradesLimitedMembernggtf:AOrdinarySharesMembernggtf:NationalGridElectricityTransmissionplcMember2026-03-310001004315nggtf:JointRadioCompanyLimitedMember2025-04-012026-03-310001004315nggtf:JointRadioCompanyLimitedMembernggtf:AOrdinarySharesMembernggtf:NationalGridElectricityTransmissionplcMember2026-03-310001004315nggtf:CleanLineEnergyPartnersLLCMember2025-04-012026-03-310001004315nggtf:ConnecticutYankeeAtomicPowerCompanyMember2025-04-012026-03-310001004315nggtf:DirectGlobalPowerInc.Member2025-04-012026-03-310001004315nggtf:EnergyImpactFundLPMember2025-04-012026-03-310001004315nggtf:KHBVentureLLCMember2025-04-012026-03-310001004315nggtf:MaineYankeeAtomicPowerCompanyMember2025-04-012026-03-310001004315nggtf:NewYorkTranscoLLCMember2025-04-012026-03-310001004315nggtf:YankeeAtomicElectricCompanyMember2025-04-012026-03-310001004315nggtf:EnergisPLCMember2025-04-012026-03-310001004315nggtf:ElectralinkLimitedMember2025-04-012026-03-310001004315ifrs-full:ActuarialAssumptionOfDiscountRatesMemberifrs-full:PensionDefinedBenefitPlansMembercountry:GB2025-04-012026-03-310001004315ifrs-full:ActuarialAssumptionOfDiscountRatesMembercountry:GB2025-04-012026-03-310001004315ifrs-full:ActuarialAssumptionOfDiscountRatesMembercountry:GB2026-03-310001004315ifrs-full:ActuarialAssumptionOfDiscountRatesMemberifrs-full:PensionDefinedBenefitPlansMembercountry:GB2024-04-012025-03-310001004315ifrs-full:ActuarialAssumptionOfDiscountRatesMembercountry:GB2024-04-012025-03-310001004315ifrs-full:ActuarialAssumptionOfDiscountRatesMembercountry:GB2025-03-310001004315ifrs-full:ActuarialAssumptionOfDiscountRatesMemberifrs-full:PensionDefinedBenefitPlansMembercountry:US2025-04-012026-03-310001004315ifrs-full:ActuarialAssumptionOfDiscountRatesMembercountry:US2025-04-012026-03-310001004315ifrs-full:ActuarialAssumptionOfDiscountRatesMembercountry:US2026-03-310001004315ifrs-full:ActuarialAssumptionOfDiscountRatesMemberifrs-full:PensionDefinedBenefitPlansMembercountry:US2024-04-012025-03-310001004315ifrs-full:ActuarialAssumptionOfDiscountRatesMembercountry:US2024-04-012025-03-310001004315ifrs-full:ActuarialAssumptionOfDiscountRatesMembercountry:US2025-03-310001004315ifrs-full:ActuarialAssumptionOfExpectedRatesOfInflationMemberifrs-full:PensionDefinedBenefitPlansMembercountry:GB2025-04-012026-03-310001004315ifrs-full:ActuarialAssumptionOfExpectedRatesOfInflationMembercountry:GB2025-04-012026-03-310001004315ifrs-full:ActuarialAssumptionOfExpectedRatesOfInflationMembercountry:GB2026-03-310001004315ifrs-full:ActuarialAssumptionOfExpectedRatesOfInflationMemberifrs-full:PensionDefinedBenefitPlansMembercountry:GB2024-04-012025-03-310001004315ifrs-full:ActuarialAssumptionOfExpectedRatesOfInflationMembercountry:GB2024-04-012025-03-310001004315ifrs-full:ActuarialAssumptionOfExpectedRatesOfInflationMembercountry:GB2025-03-310001004315ifrs-full:ActuarialAssumptionOfExpectedRatesOfSalaryIncreasesMemberifrs-full:PensionDefinedBenefitPlansMembercountry:GB2025-04-012026-03-310001004315ifrs-full:ActuarialAssumptionOfExpectedRatesOfSalaryIncreasesMembercountry:GB2025-04-012026-03-310001004315ifrs-full:ActuarialAssumptionOfExpectedRatesOfSalaryIncreasesMembercountry:GB2026-03-310001004315ifrs-full:ActuarialAssumptionOfExpectedRatesOfSalaryIncreasesMemberifrs-full:PensionDefinedBenefitPlansMembercountry:GB2024-04-012025-03-310001004315ifrs-full:ActuarialAssumptionOfExpectedRatesOfSalaryIncreasesMembercountry:GB2024-04-012025-03-310001004315ifrs-full:ActuarialAssumptionOfExpectedRatesOfSalaryIncreasesMembercountry:GB2025-03-310001004315ifrs-full:ActuarialAssumptionOfExpectedRatesOfSalaryIncreasesMemberifrs-full:PensionDefinedBenefitPlansMembercountry:US2025-04-012026-03-310001004315ifrs-full:ActuarialAssumptionOfExpectedRatesOfSalaryIncreasesMembercountry:US2025-04-012026-03-310001004315ifrs-full:ActuarialAssumptionOfExpectedRatesOfSalaryIncreasesMembercountry:US2026-03-310001004315ifrs-full:ActuarialAssumptionOfExpectedRatesOfSalaryIncreasesMemberifrs-full:PensionDefinedBenefitPlansMembercountry:US2024-04-012025-03-310001004315ifrs-full:ActuarialAssumptionOfExpectedRatesOfSalaryIncreasesMembercountry:US2024-04-012025-03-310001004315ifrs-full:ActuarialAssumptionOfExpectedRatesOfSalaryIncreasesMembercountry:US2025-03-310001004315ifrs-full:ActuarialAssumptionOfLifeExpectancyAfterRetirementMemberifrs-full:PensionDefinedBenefitPlansMembercountry:GB2025-04-012026-03-310001004315ifrs-full:ActuarialAssumptionOfLifeExpectancyAfterRetirementMembercountry:GB2025-04-012026-03-310001004315ifrs-full:ActuarialAssumptionOfLifeExpectancyAfterRetirementMembercountry:GB2026-03-310001004315ifrs-full:ActuarialAssumptionOfLifeExpectancyAfterRetirementMemberifrs-full:PensionDefinedBenefitPlansMembercountry:GB2024-04-012025-03-310001004315ifrs-full:ActuarialAssumptionOfLifeExpectancyAfterRetirementMembercountry:GB2024-04-012025-03-310001004315ifrs-full:ActuarialAssumptionOfLifeExpectancyAfterRetirementMembercountry:GB2025-03-310001004315ifrs-full:ActuarialAssumptionOfLifeExpectancyAfterRetirementMemberifrs-full:PensionDefinedBenefitPlansMembercountry:US2025-04-012026-03-310001004315ifrs-full:ActuarialAssumptionOfLifeExpectancyAfterRetirementMembercountry:US2025-04-012026-03-310001004315ifrs-full:ActuarialAssumptionOfLifeExpectancyAfterRetirementMembercountry:US2026-03-310001004315ifrs-full:ActuarialAssumptionOfLifeExpectancyAfterRetirementMemberifrs-full:PensionDefinedBenefitPlansMembercountry:US2024-04-012025-03-310001004315ifrs-full:ActuarialAssumptionOfLifeExpectancyAfterRetirementMembercountry:US2024-04-012025-03-310001004315ifrs-full:ActuarialAssumptionOfLifeExpectancyAfterRetirementMembercountry:US2025-03-310001004315ifrs-full:ActuarialAssumptionOfMedicalCostTrendRatesMemberifrs-full:PensionDefinedBenefitPlansMembercountry:US2025-04-012026-03-310001004315ifrs-full:ActuarialAssumptionOfMedicalCostTrendRatesMembercountry:US2025-04-012026-03-310001004315ifrs-full:ActuarialAssumptionOfMedicalCostTrendRatesMembercountry:US2026-03-310001004315ifrs-full:ActuarialAssumptionOfMedicalCostTrendRatesMemberifrs-full:PensionDefinedBenefitPlansMembercountry:US2024-04-012025-03-310001004315ifrs-full:ActuarialAssumptionOfMedicalCostTrendRatesMembercountry:US2024-04-012025-03-310001004315ifrs-full:ActuarialAssumptionOfMedicalCostTrendRatesMembercountry:US2025-03-310001004315nggtf:ChangeInRealDiscountRateMemberifrs-full:OtherEnvironmentRelatedProvisionMember2025-04-012026-03-310001004315nggtf:ChangeInRealDiscountRateMemberifrs-full:OtherEnvironmentRelatedProvisionMember2026-03-310001004315nggtf:ChangeInRealDiscountRateMemberifrs-full:OtherEnvironmentRelatedProvisionMember2024-04-012025-03-310001004315nggtf:ChangeInRealDiscountRateMemberifrs-full:OtherEnvironmentRelatedProvisionMember2025-03-310001004315nggtf:ChangeInEstimatedFutureCashFlowsChangeMemberifrs-full:OtherEnvironmentRelatedProvisionMember2025-04-012026-03-310001004315nggtf:ChangeInEstimatedFutureCashFlowsChangeMemberifrs-full:OtherEnvironmentRelatedProvisionMember2026-03-310001004315nggtf:ChangeInEstimatedFutureCashFlowsChangeMemberifrs-full:OtherEnvironmentRelatedProvisionMember2024-04-012025-03-310001004315nggtf:ChangeInEstimatedFutureCashFlowsChangeMemberifrs-full:OtherEnvironmentRelatedProvisionMember2025-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GBnggtf:ValueOfBuyInPoliciesOffsetToActuarialAssumptionOfDiscountRateMember2026-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GBnggtf:ValueOfBuyInPoliciesOffsetToActuarialAssumptionOfDiscountRateMember2025-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GBnggtf:ValueOfBuyInPoliciesOffsetToActuarialAssumptionOfExpectedRatesOfInflationMember2026-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GBnggtf:ValueOfBuyInPoliciesOffsetToActuarialAssumptionOfExpectedRatesOfInflationMember2025-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GBnggtf:ValueOfBuyInPoliciesAndLongevitySwapOffsetToActuarialAssumptionOfLifeExpectancyAfterRetirementMember2026-03-310001004315ifrs-full:PensionDefinedBenefitPlansMembercountry:GBnggtf:ValueOfBuyInPoliciesAndLongevitySwapOffsetToActuarialAssumptionOfLifeExpectancyAfterRetirementMember2025-03-310001004315ifrs-full:OtherPriceRiskMembercountry:GB2025-04-012026-03-310001004315ifrs-full:OtherPriceRiskMembercountry:GB2026-03-310001004315ifrs-full:OtherPriceRiskMembercountry:GB2024-04-012025-03-310001004315ifrs-full:OtherPriceRiskMembercountry:GB2025-03-310001004315ifrs-full:InterestRateRiskMembercountry:GB2025-04-012026-03-310001004315ifrs-full:InterestRateRiskMembercountry:GB2026-03-310001004315ifrs-full:InterestRateRiskMembercountry:GB2024-04-012025-03-310001004315ifrs-full:InterestRateRiskMembercountry:GB2025-03-310001004315ifrs-full:InterestRateRiskMembercountry:US2025-04-012026-03-310001004315ifrs-full:InterestRateRiskMembercountry:US2026-03-310001004315ifrs-full:InterestRateRiskMembercountry:US2024-04-012025-03-310001004315ifrs-full:InterestRateRiskMembercountry:US2025-03-310001004315ifrs-full:CurrencyRiskMembercountry:US2025-04-012026-03-310001004315ifrs-full:CurrencyRiskMembercountry:US2026-03-310001004315ifrs-full:CurrencyRiskMembercountry:US2024-04-012025-03-310001004315ifrs-full:CurrencyRiskMembercountry:US2025-03-310001004315ifrs-full:CommodityPriceRiskMember2025-04-012026-03-310001004315ifrs-full:CommodityPriceRiskMember2026-03-310001004315ifrs-full:CommodityPriceRiskMember2024-04-012025-03-310001004315ifrs-full:CommodityPriceRiskMember2025-03-310001004315nggtf:DerivativeFinancialInstrumentsMembernggtf:FairValueChangeMember2025-04-012026-03-310001004315nggtf:DerivativeFinancialInstrumentsMembernggtf:FairValueChangeMember2026-03-310001004315nggtf:DerivativeFinancialInstrumentsMembernggtf:FairValueChangeMember2024-04-012025-03-310001004315nggtf:DerivativeFinancialInstrumentsMembernggtf:FairValueChangeMember2025-03-310001004315nggtf:CommodityContractDerivativeLiabilitiesMembernggtf:FairValueChangeMember2025-04-012026-03-310001004315nggtf:CommodityContractDerivativeLiabilitiesMembernggtf:FairValueChangeMember2026-03-310001004315nggtf:CommodityContractDerivativeLiabilitiesMembernggtf:FairValueChangeMember2024-04-012025-03-310001004315nggtf:CommodityContractDerivativeLiabilitiesMembernggtf:FairValueChangeMember2025-03-310001004315nggtf:MajorLoanAgreementMembernggtf:A864.9Million10YearLoanMembernggtf:NationalGridNorthAmericaInc.Member2026-04-13

SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549

FORM 20-F

(Mark One)
£REGISTRATION STATEMENT PURSUANT TO SECTION 12(b) OR (g) OF THE SECURITIES EXCHANGE ACT OF 1934
OR
RANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the fiscal year ended 31 March 2026
OR
£TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
OR
£SHELL COMPANY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
Date of event requiring this shell company report    
For the transition period from      to    

Commission file number: 001-14958

NATIONAL GRID PLC
(Exact name of Registrant as specified in its charter)
England and Wales
(Jurisdiction of incorporation or organization)
1-3 Strand, London WC2N 5EH, England
(Address of principal executive offices)
Justine Campbell
011 44 20 7004 3000
Facsimile No. 011 44 20 7004 3004
Group General Counsel and Company Secretary
National Grid plc
1-3 Strand London WC2N 5EH, England
(Name, Telephone, E-mail and/or Facsimile number and Address of Company Contact Person)

Securities registered or to be registered pursuant to Section 12(b) of the Securities Exchange Act of 1934:

Title of each classTrading Symbol(s)Name of each exchange on which registered
Ordinary Shares of 12 204/473 pence eachNG
The New York Stock Exchange*
American Depositary Shares, each representing fiveNGGThe New York Stock Exchange
5.602% Notes due 2028 NGG28The New York Stock Exchange
5.809% Notes due 2033NGG33The New York Stock Exchange
5.418% Notes due 2034NGG34The New York Stock Exchange
____________
*    Not for trading, but only in connection with the registration of American Depositary Shares representing Ordinary Shares pursuant to the requirements of the Securities and Exchange Commission.

Securities registered or to be registered pursuant to Section 12(g) of the Securities Exchange Act of 1934: None.

Securities for which there is a reporting obligation pursuant to Section15(d) of the Securities Exchange Act of 1934: None.




The number of outstanding shares of each of the issuer’s classes of capital or common stock as of 31 March 2026 was 5,198,968,690
Ordinary Shares of 12 204/473 pence each    

Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act: Yes R No £

If this report is an annual or transition report, indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934. Yes £ No R

Note — Checking the box above will not relieve any registrant required to file reports pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934 from their obligations under those Sections.

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days: Yes R No £

Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§ 232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files).: Yes R No £

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer or an emerging growth company. See definition of “large accelerated filer” “accelerated filer” and “emerging growth company” in Rule 12b-2 of the Exchange Act.

Large accelerated filer R
Non-accelerated filer £
 Accelerated filer £
Emerging growth company £

If an emerging growth company that prepares its financial statements in accordance with U.S. GAAP, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards† provided pursuant to Section 13(a) of the Exchange Act.  ☐

†The term “new or revised financial accounting standard” refers to any update issued by the Financial Accounting Standards Board to its Accounting Standards Codification after April 5, 2012.

Indicate by check mark whether the registrant has filed a report on and attestation to its management’s assessment of the effectiveness of its internal control over financial reporting under Section 404(b) of the Sarbanes-Oxley Act (15 U.S.C. 7262(b)) by the registered public accounting firm that prepared or issued its audit report. R

If securities are registered pursuant to Section 12(b) of the Act, indicate by check mark whether the financial statements of the registrant included in the filing reflect the correction of an error to previously issued financial statements. ☐

Indicate by check mark whether any of those error corrections are restatements that required a recovery analysis of incentive-based compensation received by any of the registrant’s executive officers during the relevant recovery period pursuant to §240.10D-1(b). ☐

Indicate by check mark which basis of accounting the registrant has used to prepare the financial statements included in this filing:

U.S. GAAP £
International Financial Reporting Standards as issued by the International Financial Reporting Standards R
Other £

If “Other” has been checked in response to the previous question, indicate by check mark which financial statement item the registrant has elected to follow. Item 17 £ Item 18 £

If this is an annual report, indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act). Yes £ No R

This constitutes the annual report on Form 20-F of National Grid plc (the “Company”) in accordance with the requirements of the US Securities and Exchange Commission (the “SEC”) for the year ended 31 March 2026 and is dated 3 June 2026. Details of events occurring subsequent to the approval of the annual report on 13 May 2026 are summarised in section “Further Information” which forms a part of this Form 20-F. The content of the Group’s website (www.nationalgrid.com/uk) should not be considered to form part of this annual report on Form 20-F.



Form 20-F Cross Reference Table

Item
Form 20-F caption
Location in the document
Pages(s)
1Identity of directors, senior management and advisorsNot applicable — 
2Offer statistics and expected timetableNot applicable— 
3Key Information
3A [Reserved] — 
3B Capitalization and indebtednessNot applicable
3C Reasons for the offer and use of proceedsNot applicable— 
3D Risk Factors
“Additional Information—Internal control and risk factors—Risk factors”
226-232
4Information on the company
4A History and development of the company
“Strategic Report—National Grid at a glance”
4-5
“Strategic Report—Chief Executive’s review” 8-11
“Strategic Report—Our business environment”14-15
“Strategic Report—Performance against our strategic priorities ”16-17
“Strategic Report—Our key performance indicators”
26-29
“Strategic Report—Financial review—Capital Investment and asset growth ”
78
“Financial Statements—Notes to the consolidated financial statements—Note 2. Segmental analysis—(c) Capital investment”148
“Financial Statements—Notes to the consolidated financial statements—Note 3. Revenue —(g) UK Electricity System Operator”150
“Financial Statements—Notes to the consolidated financial statements—Note 5 Exceptional items and remeasurements —2026;—2025;—2024”155-156
“Financial Statements—Notes to the consolidated financial statements—Note 10. Assets held for sale and discontinued operations”164-165
“Additional Information—The business in detail—UK Regulation” and “—US Regulation”220-225
“Additional Information—Shareholder information—Articles of Association”251-252
“Additional Information—Shareholder Information— Documents on display” 252
“Additional Information—Other disclosures—Research, development and innovation activity”
235
“Additional Information—Other unaudited financial information—Alternative performance measures/non-IFRS reconciliations—Capital investment at constant currency” 241
“Additional Information—Shareholder information”250-255
4B Business overview
“Strategic Report—National Grid at a glance —Our businesses”
4
“Strategic Report—Our Business Model”
12-13
“Strategic Report—Our Business environment”
14-15
“Strategic Report—Performance against our strategic priorities ”16-17
“Strategic Report—Our business units “—UK Electricity Transmission”; “—UK Electricity Distribution”; —New England”; —New York”; “—National Grid Ventures”18-22
“Strategic Report—Task Force on Climate-related Financial Disclosures (TCFD)”53-68
“Strategic Report—Financial review—Segmental operating profit”
73-77
i



“Financial Statements—Notes to the consolidated financial statements—Note 2. Segmental analysis”145-148
“Financial Statements—Notes to the consolidated financial statements—Note 3. Revenue”149-152
“Financial Statements—Notes to the consolidated financial statements—Note 10. Assets held for sale and discontinued operations”164-165
“Financial Statements—Notes to the consolidated financial statements—Note 17. Derivative financial instruments—(b) Commodity contract derivatives”175
“Additional Information—The business in detail—UK Regulation” and “—US Regulation” 220-225
4C Organizational structure“Financial Statements—Notes to the consolidated financial statements—Note 34. Subsidiary undertakings, joint arrangements and associates”206-209
4D Property, plants and equipment
“National Grid at a glance—Our businesses”
4
“Strategic Report—Our business model”12-13
“Strategic Report—Task Force on Climate-related Financial Disclosures (TCFD)”53-68
“Strategic Report—Financial review—Capital Investment and asset growth”
78
“Strategic Report—Financial review—Financial Position”80
“Financial Statements—Consolidated statement of financial position”
140
“Financial Statements—Notes to the consolidated financial statements—Note 13. Property, plant and equipment”169-171
“Financial Statements—Notes to the consolidated financial statements—Note 21. Borrowings”177-178
“Additional Information—Internal control and risk factors—Risk factors—Operational risks”
229-231
“Additional Information—Other disclosures—Property, plant, equipment and borrowings”
235
4AUnresolved staff comments“Additional Information—Other disclosures—Unresolved SEC staff comments”235
5Operating and financial review and prospects
5A Operating results“Strategic Report—Our business environment”14-15
“Strategic Report—Our business units “—UK Electricity Transmission”; “—UK Electricity Distribution”; —New England”; —New York”; “—National Grid Ventures”18-22
“Strategic Report—Task Force on Climate-related Financial Disclosures (TCFD)”53-68
“Strategic Report—Financial review” 69-84
“Financial Statements—Notes to the consolidated financial statements—Note 2. Segmental analysis”145-48
“Financial Statements—Notes to the consolidated financial statements—Note 3. Revenue”149-152
“Financial Statements—Notes to the consolidated financial statements—Note 5 Exceptional items and remeasurements ”154-157
“Financial Statements—Notes to the consolidated financial statements—Note 32. Financial risk management—(c) Currency risk”197-198
“Additional Information—The business in detail—Other activities”;—UK Regulation” and “—US Regulation”220-225
“Additional Information—Internal control and risk factors—Risk factors—Law, regulation and political and economic uncertainty”227
“Additional Information—Commentary on consolidated financial statements”248-249
5B Liquidity and capital resources“Strategic Report—Task Force on Climate-related Financial Disclosures (TCFD)”53-68
“Strategic Report—Financial review”69-84
ii



“Financial Statements—Consolidated cash flow statement” 141
“Financial Statements—Notes to the consolidated financial statements—Note 1.A Going concern”142
“Financial Statements—Notes to the consolidated financial statements—Note 17. Derivative financial instruments”174-175
“Financial Statements—Notes to the consolidated financial statements—Note 20. Cash and cash equivalents”177
“Financial Statements—Notes to the consolidated financial statements—Note 21. Borrowings”177-178
“Financial Statements—Notes to the consolidated financial statements—Note 29. Net debt”190-193
“Financial Statements—Notes to the consolidated financial statements—Note 30. Commitments and contingencies”194
“Financial Statements—Notes to the consolidated financial statements—Note 32. Financial risk management”195-205
“Financial Statements—Notes to the consolidated financial statements—Note 33. Borrowing facilities”205
“Additional Information—The business in detail—UK Regulation”; “—US Regulation”220-225
“Additional Information—Internal control and risk factors—Risk factors—Financing and liquidity”232
5C Research and development, patents and licenses, etc.
“Additional Information—Other disclosures—Research, development and innovation activity”
235
5D Trend information“Strategic Report—Chief Executive's Review ”8-11
“Strategic Report—Our business environment”14-15
“Strategic Report—Task Force on Climate-related Financial Disclosures (TCFD)”53-68
“Strategic Report—Financial review”69-84
“Strategic Report—Our business units “—UK Electricity Transmission”; “—UK Electricity Distribution”; —New England”; —New York”; “—National Grid Ventures”18-22
5E Critical Accounting Estimates Not applicable
—
6Directors, senior management and employees
6A Directors and senior management“Corporate Governance Report—Our Board”91-93
6B Compensation“Corporate Governance Report—People &’ Remuneration Committee report” 107-126
“Corporate Governance Report— People & remuneration Committee report —Remuneration at a Glance” 109-110
“Corporate Governance Report—People & Remuneration Committee report—Statement of implementation of policy in 2025/26 ”111-124
“Financial Statements—Notes to the consolidated financial statements—Note 4. Other operating costs—(c) Key management compensation” 153
“Financial Statements—Notes to the consolidated financial statements—Note 25. Pensions and other post-retirement benefits”179-186
6C Board practices“Corporate Governance Report—Our Board” 91-93
“Corporate Governance Report—Corporate Governance overview”89-90
“Corporate Governance Report—Audit & Risk Committee report”100-104
“Corporate Governance Report—People & Remuneration Committee report”107-126
“Corporate Governance Report—People & Remuneration Committee report—Statement of implementation of policy in 2025/26 ”111-124
“Additional Information—Shareholder Information—Articles of Association—Directors”
251
6D Employees“Strategic Report—Our business model” 12-13
iii



“Strategic Report—Our People”
47-48, 234
“Financial Statements—Notes to the consolidated financial statements—Note 4. Other operating costs—(b) Number of employees”153
“Additional Information—Other disclosures —Unions”234
6E Share ownership“Corporate Governance Report—People & Remuneration Committee report—Statement of implementation of policy in 2025/26 ”111-124
“Additional Information—Shareholder information—All-employee share plans”255
“Share ownership”“Further Information”
6F Disclosure of a registrant’s action to cover erroneously awarded compensation Not applicable
—
7Major shareholders and related party transactions
7A Major shareholders“Additional Information—Shareholder information—Material interests in shares”253
“Material interests in shares”; and “Material interest in American Depositary Shares”“Further Information”
7B Related party transactions“Financial Statements—Notes to the consolidated financial statements—Note 30. Commitments and contingencies”194
“Financial Statements—Notes to the consolidated financial statements—Note 31. Related party transactions”194
“Material interests in shares”“Further Information”
7C Interests of experts and counselNot applicable
—
8Financial information
8A Consolidated statements and other financial information“Strategic Report—Chair’s statement”6-7
“Strategic Report—Financial review”69-84
“Strategic Report—Corporate governance overview—Key Board Activities ”
94
“Corporate Governance—Audit & Risk Committee report—Significant issues and judgments relating to the financial statements102
Financial Statements—Consolidated financial statements ”137-211
“Financial Statements—Notes to the consolidated financial statements—Note 9. Dividends”164
“Reports of Independent Registered Public Accounting Firm—Audit opinions for Form 20-F”“Further Information”
8B Significant changes“Strategic Report—Financial Review—Post balance sheet events”84
“Financial Statements—Notes to the consolidated financial statements—Note 36. Post balance sheet events”211
“Additional Information—Shareholder Information—Events after the reporting period”252
“Subsequent Events”“Further Information”
9The offer and listing
9A Offer and listing details“Additional Information—Shareholder Information—Share information” 252
9B Plan of distributionNot applicable
—
9C Markets“Additional Information—Shareholder information—Share Information”252
9D Selling shareholdersNot applicable
—
9E DilutionNot applicable
—
9F Expenses of the issueNot applicable
—
10Additional information
iv



10A Share capitalNot applicable
—
10B Memorandum and articles of association
“Additional Information—Shareholder information—Articles of Association”
251-252
“Additional Information—Shareholder information—Articles of Association; — Dividend Rights"
251
“Additional Information—Other disclosures—Change of control provisions”233
“Additional Information—Other disclosures—Corporate governance practices: differences from NYSE listing standards”
233-234
10C Material contracts
“Additional Information—Other disclosures—Material contracts”
235
10D Exchange controls
“Additional Information—Shareholder information—Exchange controls”
252
10E Taxation
“Additional Information——Shareholder information—Taxation”
253-255
10F Dividends and paying agentsNot applicable
—
10G Statement by expertsNot applicable
—
10H Documents on display“Additional Information—Shareholder information—Documents on display”252
10I Subsidiary informationNot applicable
10J Annual Report to Security holders Not applicable
11Quantitative and qualitative disclosures about market risk
11(a) Quantitative information about market risk“Financial Statements—Notes to the consolidated financial statements—Note 17. Derivative financial instruments” 174-175
“Financial Statements—Notes to the consolidated financial statements—Note 32. Financial risk management”195-205
“Additional Information—Internal Control and Risk factors—Risk Factors” 226-232
11(b) Qualitative information about market risk“Financial Statements—Notes to the consolidated financial statements—Note 35. Sensitivities”210-211
11(c) Interim Periods Not Applicable
—
11(d) Forward looking statement safe harbor “Additional Information—Cautionary statement”262
12Description of securities other than equity securities
12A Debt securitiesNot applicable
—
12B Warrants and rightsNot applicable
—
12C Other securitiesNot applicable—–
12D American depositary shares“Additional Information—Shareholder information—Depositary payments to the Company”252
“Additional Information—Definitions and glossary of terms”256-261
“Material interest in American Depositary Shares”“Further Information”
13Defaults, dividend arrearages and delinquenciesNot applicable
—
14Material modifications to the rights of security holders and use of proceedsNot applicable
15Controls and procedures
15(a) Disclosure controls and procedures “Additional information —Internal control and risk factors—Disclosure controls” 226
15(b) Management’s annual report on internal control over financial reporting “Additional Information—Internal control and risk factors——Internal control over financial reporting” 226
“Corporate Governance Report—Audit & Risk Committee report”100-104
15(c) Attestation report of the registered public accounting firm “Report of Independent Registered Public Accounting Firm—Audit opinions for Form 20-F”“Further Information”
v



15(d) Changes in internal control over financial reporting None 226
1616A Audit committee financial expert“Corporate Governance Report—Our Board”91-93
“Corporate Governance—Audit & Risk Committee report—Committee financial experience” 100
16B Code of ethics
“Additional Information—Other disclosures—Code of Ethics”
233
16C Principal accountant fees and services
“Corporate Governance Report—Audit & Risk Committee report—External audit—External auditors' fees”
104
“Corporate Governance Report—Audit & Risk Committee report—External audit—Non-audit services”104
“Financial Statements—Notes to the consolidated financial statements—Note 4. Other operating costs—(d) Auditors’ remuneration”153
16D Exemptions from the listing standards for audit committeesNot applicable
—
16E Purchases of equity securities by the issuer and affiliated purchasers“Additional Information—Shareholder information—Material interests in shares—Authority to purchase shares”253
16F Change in registrant’s certifying accountantNot applicable
—
16G Corporate governance“Additional Information—Other disclosures—Corporate governance practices: differences from NYSE listing standards”233-234
16H Mine safety disclosureNot applicable
—
16I Disclosure Regarding Foreign Jurisdictions that Prevent Inspections Not applicable
—
16J Insider Trading Policies “Insider Trading Policy”“Further Information” and Exhibit 11(b)
16K Cybersecurity Disclosures
16K(b) Risk management and strategy“Additional Information—Internal control and risk factors—Risk factors—Cyber or physical security breaches”229
16K(c) Governance“Strategic Report—Our principal risks and uncertainties—Catastrophic security incident”32
“Strategic Report—Cybersecurity governance”37
17Financial statementsNot applicable
—
18Financial statements
Financial Statements—“Consolidated financial statements”137-211
“Financial Statements—Reports of Independent Registered Public Accounting Firm—Audit opinions for Form 20-F”“Further Information”
19ExhibitsFiled with the SEC
—




vi

cover+logo v5.jpg
We Bring Energy to
Power Possibilities
Annual Report and Accounts 2025/26
NG_ARA25_Welcompe IFC BG.jpg
Welcome to National Grid
We Bring
Energy to Power
Possibilities
We are driven by our mission, safely and reliably
connecting millions of people to the energy they
use, while investing at scale to meet rising
demand, power economic growth and deliver
system resilience and energy security.
Read-more-arrow-white.gif
Read more on page 10
Strategic Report
2025/26 performance highlights
National Grid at a glance
Chair’s statement
Chief Executive’s review
Our business model
Our business environment
Performance against our strategic priorities
Our business units
Our stakeholders
Our key performance indicators
Internal control and risk management
Our Group Principal Risks
Responsible Business review
TCFD
Financial review
Section 172 and NSIS statement
Viability statement
Corporate Governance
Chair’s statement
Governance overview
Our Board
Key Board activities
Culture and workforce engagement
Board evaluation
Directors’ induction,
development and training
Nomination Committee report
Audit & Risk Committee report
Safety & Operations Committee report
Responsible Business Committee report
Directors’ Remuneration report
Financial Statements
Statement of Directors’ responsibilities
129
Independent Auditor’s report
137
Consolidated financial statements
212
Company financial statements
Additional Information
220
The business in detail
226
Internal control and risk factors
233
Other disclosures
236
Other unaudited financial information
248
Commentary on consolidated financial
statements
250
Shareholder information
256
Definitions and glossary of terms
262
Cautionary statement
Our reporting
Online content
In this report there are QR codes you can scan to view
further content online. Simply open the camera app on
your smartphone to scan the code.
Further reading
Throughout this report you can find links to further detail
within this document.
Online report and other web content
The PDF of our Annual Report and Accounts 2025/26
includes a full search facility. You can find the document
by visiting our website nationalgrid.com/investors/
resources/reports-plc or by scanning the QR code below.
Read this report online
Read-more-arrow-clear.gif
Online-arrow-clear.gif
read this report ifc.jpg
National Grid plc  Annual Report and Accounts 2025/26
1
Strategic Report
Corporate Governance
Financial Statements
Additional Information
2025/26 performance highlights
Statutory
operating profit
2024/25: £4,934m
+10% y-on-y
£5,431m
Statutory
earnings per share
2024/25: 60.0p
+9% y-on-y
65.5p
Capital
investment
2024/25:
£9.85bn
+18% y-on-y
£11.58bn
Dividend per share
2024/25: 46.72p
+3.8% y-on-y
48.49p
Underlying
operating profit
2024/25: £5,357m
+6% y-on-y
£5,680m
Underlying
earnings per share
2024/25: 73.3p
+6% y-on-y
78.0p
Asset growth
2024/25: 9.0%
+190bps y-on-y
10.9%
Alternative performance measure
In addition to International Financial Reporting Standards (IFRS)
figures, management also uses a number of alternative measures
to assess performance. Definitions and reconciliations to
statutory financial information can be found on pages 236 – 247.
These measures are highlighted with the symbol above.
Reporting currency
Our financial results are reported in sterling. We convert our US
business results at the weighted average exchange rate during the
year, which for 2025/26 was $1.34 to £1 (2024/25: $1.27 to £1).
APM-arrow_Clear-BG.gif
APM-arrow_Clear-BG.gif
APM-arrow_Clear-BG.gif
APM-arrow_Clear-BG.gif
National Grid plc  Annual Report and Accounts 2025/26
2
Strategic Report
Corporate Governance
Financial Statements
Additional Information
2025/26 performance highlights cont.
NG_Sellindge_170425-182_pp2 new.jpg
Network reliability
2024/25: 99.9%
in line with prior year
99.9%
Lost time injury frequency rate
per 100,000 hours worked
2024/25: 0.10
+10% y-on-y
0.11
Scope 1 and 2 GHG
emissions in mtCO2e
2024/25: 7.4
+1.2% y-on-y
7.5
Employee engagement in our
twice annual Grid:Voice survey
2024/25: 80%
+100bps
81%
Feature page NYC from above v3.jpg
National Grid plc  Annual Report and Accounts 2025/26
3
Strategic Report
Corporate Governance
Financial Statements
Additional Information
We Bring Energy
to Power Possibilities
Chair’s statement
page 6
Technology changes our existence –
and is inextricably linked to energy
National Grid is in the right place at the right time to take part
in the evolving energy landscape, with extensive grids in the
UK and US primed for expansion. We have announced our
intention to invest at least £70 billion over the next five years
to enhance our networks. This is an ambitious effort and
demands that we increase our agility, our productivity, and
our speed of technology adoption.
Chief Executive’s review
page 8
Energy is the foundation of modern economies and the
grid is the platform that makes energy usable at scale
The networks we plan, build and operate today will serve
customers for decades. The choices we make now,
on sequencing, design, capital discipline and system
architecture, will shape investment, resilience and
economic growth for a generation.
Responsible Business review
page 38
Responsible business is important to us and
our stakeholders
Over the past year, we have navigated a complex landscape
characterised by significant economic and political uncertainty.
In this environment, energy security and affordability remain
priorities. Part of being a responsible business is taking account
of, and responding to, the expectations of our customers,
communities, colleagues and other stakeholders.
National Grid plc Annual Report and Accounts 2025/26
4
Strategic Report
Corporate Governance
Financial Statements
Additional Information
National Grid at a glance
Main image NEW.jpg
Infrastructure
at the heart of
energy systems
National Grid businesses play a vital role in energy
systems in the UK and US, connecting sources of
power to the customers that use them and shaping
the future of our critical energy networks.
At_A_Glance_UK_ET_7May.jpg
See our business model on page 12 – 13
Read-more-arrow-clear.gif
Our businesses
UK
UK Electricity Transmission
(UK ET/NGET)
We own and operate the high-voltage electricity
transmission network in England and Wales. This
connects and transmits electricity between
generators, storage, large customers and distribution
networks while delivering the major strategic
infrastructure for a resilient and clean power grid.
UK Electricity Distribution
(UK ED/NGED)
We own and operate the UK's largest electricity
distribution network, serving a population of 20
million people across the East Midlands, West
Midlands, South West and South Wales. This
includes a Distribution System Operator overseen
by an independent panel.
Read-more-arrow.gif
Read more on page 18
Read-more-arrow.gif
Read more on page 19
At_A_Glance_UK_ED_7May.jpg
Our values
Do the right thing
Find a better way
Make it happen
–Stand up for safety every day
–Put our customers first
–Be inclusive, supporting and
caring for each other
–Speak up, challenge and act
where something doesn’t
feel right
–Embrace the power and
opportunity of diversity
–Increase efficiency to help
with customer affordability
–Work with others to find
solutions for customers
–Commit to learning and   
new ideas
–Take personal ownership for
delivering results
–Be bold and act with passion
and purpose
–Focus on progress over
perfection
–Follow the problem through
to the end
National Grid plc Annual Report and Accounts 2025/26
5
Strategic Report
Corporate Governance
Financial Statements
Additional Information
National Grid at a glance cont.
Our businesses
US
International
New York (NY)
We own and operate electricity transmission,
electricity distribution and gas distribution
networks in Upstate and Downstate New York,
delivering energy to 4.2 million customers
(1.7 million electric and 2.5 million gas).
New England (NE)
We own and operate electricity and gas
distribution networks in Massachusetts, serving
2.3 million customers. We also own and operate
electricity transmission networks across
Massachusetts, New Hampshire and Vermont.
National Grid Ventures (NGV)
We develop and operate large-scale energy
projects across the UK and US. They represent a
broad mix of energy assets and businesses,
including six electricity interconnectors between
the UK and Europe, US competitive transmission,
power generation and battery storage.
Other activities
Primarily National Grid Partners, the corporate
venture capital and innovation arm of National
Grid, plus UK property, insurance and corporate
activities.
Read-more-arrow.gif
Read more on page 20
Read-more-arrow.gif
Read more on page 21
Read-more-arrow.gif
Read more on page 22
Read-more-arrow.gif
Read more on page 22
At_A_Glance_US_NY_7May.jpg
At_A_Glance_US_NE_21 May.jpg
NGV_Sellinge_130924_JA-41 pp5.jpg
Inter_Other_020.jpg
APM-arrow.gif
APM-arrow.gif
2025/26 Regulatory asset value (RAV), rate base
and other assets (% of Group)
2025/26 Underlying operating profit (% of Group)
2025/26 Capital investment (% of Group)
n
UK Electricity
Transmission
34%
n
New
England
14%
n
UK Electricity
Transmission
30%
n
New
England
15%
n
UK Electricity
Transmission
38%
n
New
England
17%
n
UK Electricity
Distribution
18%
n
National Grid
Ventures
4%
n
UK Electricity
Distribution
22%
n
National Grid
Ventures
6%
n
UK Electricity
Distribution
14%
n
National Grid
Ventures
1%
n
New York
27%
n
Other activities
3%
n
New York
30%
n
Other activities
(3)%
n
New York
30%
APM-arrow.gif
Alternative performance measure
1
13
25
National Grid plc Annual Report and Accounts 2025/26
6
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Chair’s statement
Chair's statement.jpg
Paula Rosput Reynolds
Technology
changes our
existence –
and is inextricably
linked to energy
National Grid is in the right place at
the right time in this evolving landscape.
National Grid plc Annual Report and Accounts 2025/26
7
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Chair’s statement cont.
“National Grid is a guardian
of the integrity and capability
of the energy system. It’s our
job to ensure that energy
grids in our regions – both
electricity and natural gas –
have the capability to
move energy to where it is
needed, when it is needed.”
Dear fellow shareholder,
At the very moment you are reading this letter,
more than five billion people around the world are
using the internet. In fact, three-quarters of the
global population are internet users. Yet there are
still two billion people, primarily in Central and
Eastern Africa and South Asia, who have yet to
experience what most of us take for granted. But
whether you are in New York or London, or in rural
Myanmar or on a remote island in Indonesia,
progress only moves one way. Technology
changes our existence – and is inextricably linked
to energy.
Technology saves energy, but it also creates the
need for energy. Artificial intelligence (AI) is the
classic example of both. AI has been years in
development, and it already operates within every
domain of the digital world. But it relies on
increasingly sophisticated microchips, which
consume more energy than early generations of
chips. Concerns about the proliferation of data
centres and how existing utility customers’ bills
might be affected are among the issues yet to be
fully resolved.
Against this backdrop, National Grid is a guardian
of the integrity and capability of the energy system.
We design, build and operate long lead-time,
capital-intensive infrastructure. It’s our job to
ensure that energy grids in our regions – both
electricity and natural gas – have the capability to
move energy to where it is needed, when it is
needed. Whether it’s connecting a wind farm in the
North Sea or providing natural gas to a new chip
fabricator in central New York, it’s our job to plan
for the future.
National Grid is in the right place at the right time in
At least
£70bn
capital investment over the
next five years
this evolving landscape. We have extensive land-
based electric power and natural gas grids in the
UK and US. With years of planning well underway,
these grids are primed for expansion. In addition,
we operate the most extensive subsea network of
high-voltage direct current (HVDC) interconnectors
in the world, linking the UK with Europe, with
further expansions planned. Given the complexity
of our networks, we are an early adopter of
technologies to make our grids more efficient.
Through sensors, automated controls, unmanned
surveillance, and AI, we are changing how
infrastructure operates. We both support the
energy requirements of AI and are a major user of
its capabilities.
National Grid has announced its intention to invest
at least £70 billion over the next five years to
enhance our networks. This is an ambitious effort
but, rest assured, our focus on safety and reliability
does not waver. The enormity of the challenge
demands that we increase our agility, our
productivity, and our speed of adoption. To this
end, in November 2025, National Grid welcomed a
new Chief Executive, Zoë Yujnovich, who
succeeded our long-serving leader, John
Pettigrew.
In this report, you’ll hear Zoë’s voice on how she is
bringing new perspectives, discipline, and energy
to National Grid.
No annual report issued by an energy company in
May 2026 would be complete without some
commentary on the situation in the Middle East.
The global disruption in the movement of
hydrocarbons through the Strait of Hormuz affects
all participants in the energy value chain.
Affordability for our customers remains a concern.
Efficiency – like the kind that Zoë is driving – is the
most powerful tool that we have to deploy.
Though we can debate the merits of how much AI,
and how quickly it is adopted, technology will
create opportunities we can only begin to imagine.
The geopolitics of the moment are troubling, but
the future is still bright.
Your ownership in National Grid underpins our
ability to deliver critical new transmission and
distribution infrastructure on two continents. On
behalf of the Board, I thank you for your continued
support of our company and our mission.
Paula Rosput Reynolds
Chair
13 May 2026
National Grid plc  Annual Report and Accounts 2025/26
8
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Chief Executive’s review
CEO statement Image 1_NEW v3.jpg
Zoë Yujnovich
Energy is
the foundation
of modern
economies and
the grid is the
platform that
makes energy
usable at scale
National Grid plc Annual Report and Accounts 2025/26
9
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Chief Executive’s review cont.
Energy is the foundation of modern economies,
and the grid is the platform that makes energy
usable at scale. For decades, it operated largely
out of sight. Today, it sits firmly at the centre of
national economic strategy, and it is not
moving back.
Across the UK and the north‑eastern United
States, there has been a fundamental shift.
Electricity demand is rising again after years of low
or negative growth. The large‑scale build‑out of
low‑carbon generation and storage, the
electrification of transport and industry, advanced
manufacturing and the rapid growth of artificial
intelligence are reshaping how and where energy is
produced and consumed. These shifts are also
influencing natural gas demand, particularly as
systems balance resilience with transition.
What has not changed is our responsibility: to
move energy safely, reliably, at scale and in real
time, from where it is produced to where it is
needed. What has changed is the urgency, and the
recognition that networks can either be an
essential catalyst for growth or a constraint.
The connection between supply and demand
depends on networks, that’s why National Grid sits
at the centre of national economic strategy.
National Grid is well positioned for this moment.
We operate extensive electricity and natural gas
networks across the UK and the north‑eastern US,
regions where demand is growing and the pace of
change is accelerating. Our networks are ready to
support expansion and modernisation. The
essential nature of what we do defines both our
responsibility and our opportunity.
Our value proposition is clear. We build, own and
operate high‑quality, regulated infrastructure that
supports economic growth, strengthens energy
security and delivers tangible benefits to the
communities we serve.
Our model offers investors exposure to sustained
long‑term growth in energy demand, without the
day‑to‑day volatility that can characterise other
sectors. The strategic nature of our assets is well
understood in investment circles, often described
as HALO: heavy assets, low obsolescence.
We are investing at unprecedented scale to
expand and modernise the networks that will
underpin this next phase of economic growth. At
the same time, we are determined to make better
use of the networks we already have and connect
customers faster.
As Chief Executive, I am clear about what this
moment demands: disciplined capital allocation,
excellence in execution and a culture that values
accountability as much as ambition. Growth
matters, but never at the expense of safety,
reliability, affordability or trust.
2025/26 financial
performance highlights
Capital investment1
£11.58bn
2025: £9.54bn +21%
Asset growth
10.9%
2025: 9.0% +190bps
Return on Equity
9.8%
2024/25: 9.0% +80bps
Underlying operating profit
£5.7bn
2024/25: 5.2bn +9%
Underlying EPS1
78.0p
2024/25: 72.0p +8%
Dividend growth in line with policy
48.49p
2024/25: 46.72p +3.8%
1.  Underlying results from continuing operations excluding
exceptional items, remeasurements, deferrable major
storm costs (when greater than $100m), timing, and the
impact of deferred tax in the UK regulated businesses
(NGET and NGED). Underlying EPS and
capital investment calculated at constant currency.
National Grid offers growth and resilience
c.8-10%                             
underlying EPS CAGR
High visibility growth
–Unmatched visibility of investment and
earnings
–Multiple growth drivers
–Critical infrastructure assets
–Long-duration cash flows and low-risk
returns
+
Resilient business model
–Strong regulatory capabilities
–Clear delivery track record
–Strong balance sheet
–Resilient to macro-economic volatility
Progressive dividend
=
Aiming to deliver double-digit
investor returns
CEO_groth and resiliance.jpg
National Grid plc Annual Report and Accounts 2025/26
10
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Chief Executive’s review cont.
Over the past six months, I have mobilised our
senior leaders in a rigorous review of the business,
testing our ambition against industry-leading peers
and customers’ rising expectations of us. This
culminated in a refreshed strategic framework – not
a change in direction, but a clearer and more
effective way of translating strategy into delivery
across a complex organisation.
At its core is our mission:
we bring energy to power possibilities.
First, we are focusing on the operational
fundamentals: delivering our capital programme on
time and on budget; maximising asset
performance and reliability; providing a consistently
strong customer experience; and functions that
support the businesses effectively. We call these
the “brilliant basics” – where credibility is earned
and trust is built, because execution is what turns
investment into impact.
Second, we are driving three “big shifts” that will
improve performance and enhance delivery
capacity: strengthening leadership, capability and
performance management; scaling technology,
data and AI to unlock productivity and faster
connections; and stepping up our external
positioning and policy engagement to help
shape outcomes that work for our customers
and investors.
As system needs evolve, regulatory and policy
frameworks must evolve too. We are being more
focused and deliberate in shaping outcomes that
support affordability, resilience and growth for
customers, communities and investors, building
coalitions and taking clearer positions.
Affordability is central to everything we do. We
recognise the pressure that energy bills place on
households and businesses, and we take seriously
our responsibility to deliver our part of the system
as efficiently as possible. How we invest and
operate has a direct impact on what customers
pay, both today and over the long term. History
shows that under‑investment does not remove
cost; it merely defers and ultimately increases it,
through connection delays leading to lost
economic opportunity and higher system operating
and constraint costs.
Our refreshed strategic framework focuses our organisation
Our focus is therefore on getting more from the
networks we have, investing efficiently, making
trade‑offs transparent and maintaining discipline as
we grow.
Achieving this transformation at pace also depends
on effective policy and the right regulatory
frameworks. Strategic planning, efficient permitting
and fair cost allocation are essential. Rate impacts
perceived as unfair, or new loads that compromise
reliability, cannot be the outcome of this growth
cycle. We work closely with our regulators, who
challenge our thinking and help ensure we deliver
for customers. We are working towards a shared
objective: networks that are affordable, resilient
and support economic growth.
Delivering new infrastructure also means earning the
trust of the communities that host it. These are
long‑lived assets that create lasting national and local
benefits, but we are candid that construction and
maintenance can bring disruption and visual impact.
Engagement therefore matters as much as
engineering. We are raising our ambition by being
clearer about the benefits projects bring, innovating
to reduce impacts wherever possible, enhancing the
natural environment and ensuring communities share
in the value created, including through skills
development, apprenticeships and local employment.
Our people sit at the heart of this effort. Each year,
we bring hundreds of new colleagues into National
Grid. For many, this is not just a job, but the start
of a long‑term career. The next generation of
colleagues will operate networks that are more
flexible and intelligent than ever before. Data,
sensors, automation, advanced system design and
digital tools, including artificial intelligence, are
already changing how we plan, operate and deliver
work. These technologies help us unlock capacity
from existing networks, connect customers faster
and improve decision‑making, while maintaining
the safety and reliability on which our
reputation depends.
Resp_Business_Intro BG v6.jpg
National Grid plc Annual Report and Accounts 2025/26
11
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Chief Executive’s review cont.
“I am deeply grateful for the
opportunity to lead National Grid
through a period of profound
change. The networks we plan,
build and operate today will
serve customers for decades.”
In 2025/26, we increased capital investment by more
than 20% to £11.6 billion, driving asset growth of
10.9%. Higher operating profit, combined with lower
financing costs, increased underlying operating profit
to £5.7 billion, delivering 8% growth in underlying
earnings per share at constant currency, in line with
our guidance. And we grew our dividend by 3.8%, in
line CPIH inflation.
These results give me confidence in the quality of
our assets and the strength of the business. The
professionalism and dedication of my colleagues
make all of this possible, and I thank them for
another year of keeping energy flowing safely
and reliably.
I also want to thank our shareholders. In my first
months as Chief Executive, I have met with many
of you and listened carefully to your perspectives.
I have taken that guidance seriously, and I hope
you will see it reflected in this report and in the way
we are positioning National Grid for the future.
Five-year financial framework
2026/27 – 2030/31
announced 2 March 2026
Capital investment
at least
£70bn
to meet decarbonisation and energy security
goals and accelerating demand growth from
data centres and industrial electrification
Group asset growth
Underlying EPS
c.10%
CAGR1
8-10%
CAGR2
1.Group asset compound annual growth rate from a 2025/26 baseline. Forward years based on assumed USD FX rate of
$1.35:£1 and long run UK CPIH and US CPI assumptions.
2.EPS compound annual growth rate from a 2025/26 baseline. Forward years based on assumed USD FX rate of             
$1.35:£1, long run UK CPIH, US CPI and interest rate assumptions and scrip uptake of 25%.
65
UK ET
c.£31bn
UK ED
c.£9bn
New York
c.£17bn
New England
c.£12bn
NGV
c.£1bn
I am deeply grateful for the opportunity to lead
National Grid through a period of profound change.
The networks we plan, build and operate today will
serve customers for decades. The choices we
make now, on sequencing, design, capital
discipline and system architecture, will shape
investment, resilience and economic growth for
a generation.
Energy will power the next economy. Networks will
carry it.
Our task is to build those networks safely,
efficiently and at the pace required, so that energy
can unlock the growth, innovation and resilience on
which modern economies depend.
Zoë Yujnovich
Chief Executive
13 May 2026
Bus Mod pp12 BG new v2.jpg
National Grid plc Annual Report and Accounts 2025/26
12
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Our business model
Delivering today,
We operate and invest in regulated infrastructure
that supports economic growth while delivering
resilient returns for shareholders and benefits for
the communities we serve.
building for tomorrow
We deploy our resources effectively…
Physical
assets
Efficient
financial capital
Strategic and
responsible leadership
Expert
colleagues
Our network assets are critical infrastructure.
They are large and built to last. We
continuously invest to maintain and upgrade
them to ensure safe and reliable service,
integrate new sources of energy, and meet
new demand.
We fund our business through a combination
of equity and debt. We maintain an
appropriate mix of the two and manage
financial risks prudently, committing to a
strong overall investment grade credit rating.
Our strategy positions our business to
support growth, long-term economic
benefits, and a cleaner future in the places
we operate. We have well-established
governance structures and controls in place
to manage risk.
We are immensely proud of our people.
Together we have spent decades installing
and managing critical networks and systems,
forging relationships, and building a culture of
ambitious, diligent and passionate service.
Read-more-arrow.gif
Read more on page 18
Read-more-arrow.gif
Read more on page 69
Read-more-arrow.gif
Read more on page 8
Read-more-arrow.gif
Read more on page 47
…and nurture our partner relationships…
With our customers, including the electricity
generators that own the energy that flows
through our networks.
With our contractors who have complementary
skills, experience and resources to help us get
the job done.
With national and regional governments and
local communities who support us to deliver
infrastructure that meets their needs.
With the regulators and agencies that agree
the prices we can charge and the amounts we
can invest, as well as the health, safety and
environment standards we must meet.
Bus Mod pp13 BG graphic new v5.jpg
National Grid plc Annual Report and Accounts 2025/26
13
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Our business model cont.
…to shape the future of energy systems…
Generation and storage
In the US, we own and operate fossil
fuel electricity generation facilities on
Long Island. We also operate modern
solar and battery storage projects
with NextEra Energy Resources on
Long Island.
Integrating cleaner energy
Renewables and zero carbon sources
play a critical and fast-growing role in
our energy systems. Facilitating
connections to a wide range of clean
energy sources – including large-scale
generation to local, customer-led
generation and storage – is a
fundamental part of our work. We earn
a regulated return on the assets we
build when extending our network to
connect new energy sources.
Interconnectors
Interconnectors are high-voltage
cables used to connect the electricity
systems of neighbouring countries to
allow the trading of excess energy and
balance supply and demand to
maintain security of supply. We
operate six interconnectors linking the
UK to France, Belgium, Norway, the
Netherlands and Denmark. We sell
capacity on our interconnectors to
facilitate cross-border flow.
Transmission
Our transmission networks transport
energy over long distances, safely and
efficiently from where it is produced to
distribution networks. We facilitate the
connection of energy generation
assets and large loads to our
transmission systems and we charge
generators and distributors for putting
energy through our networks, based
on prices set by regulators.
Distribution and supply
In the UK and US, we deliver
electricity. In the US, we also deliver
gas and act as a supplier. Our
distribution networks take high-voltage
electricity and high-pressure gas from
the transmission networks, and deliver
it at lower voltages and reduced
pressures to homes and businesses.
They also enable two-way flows as
customers generate, store and export
electricity locally. Through our UK
Electricity Distribution System
Operator (DSO) we ensure that supply
and demand are coordinated and that
local generation, storage and flexibility
can be used to support the network.
Sources of energy
Networks and infrastructure
Delivering for customers
…to create lasting value and deliver positive outcomes for our stakeholders.
Customers
Delivery of safe and reliable
energy to customers in the
communities we serve and
provision of essential assets that
connect energy generators to our
transmission networks.
Investors
A low-risk and dependable
investment proposition, focused
on generating shareholder value
through dividends and asset
growth.
Colleagues
An inclusive and safe environment
where colleagues can develop
their skills and careers to reach
their full potential.
Supply chain and
delivery partners
Responsible and efficient supply
and delivery chains with aligned
interests.
Communities
Creation of jobs, skills and
employability pathways, alongside
charitable community work and
the long-term benefits of reliable
supply through infrastructure
investment.
Political and regulatory
Trusted relationships at national
and regional levels to ensure
alignment and delivery of our
shared energy, growth and
environmental objectives.
99.9%
78.0p
33,017
c.£8bn
52,620
£9,834m
Network reliability
2024/25: 99.9%
Underlying EPS
2024/25: 73.3p
Employees
2024/25: 31,645
Electricity Transmission
Partnership launched in UK
Colleague volunteering hours
292,611 hours since 2021
Green capital expenditure1
2024/25: £7,667m
1. See definition on page 26.
Read-more-arrow.gif
Read more on our Principal Risks on page 31 — 36
National Grid plc Annual Report and Accounts 2025/26
14
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Our business environment
Our business environment is being shaped by rising electricity demand, an evolving supply mix, and major
reforms which are changing how energy systems are planned, built and operated. Against a backdrop of
geopolitical uncertainty and rapid technological change, we are delivering the adaptive and reliable
infrastructure needed to support economic growth for customers and communities.
Energy supply.jpg
Bus_Environ_Energy_Icon.gif
Energy supply
and demand
Shifts in energy supply and
demand are accelerating the need
for larger and smarter electricity
and gas networks. This is driven by
low-carbon generation, storage,
electric vehicles, electrification of
heating and industry, and
increasingly from data centres to
power AI. This is creating new
opportunities and reshaping where
and how capacity is needed.
Impact on our industry
–New generation continues to shift towards low-
carbon sources. In 2025, renewables generated
a record 52.5% of UK electricity and accounted
for nearly 88% of new generation capacity in the
US. The UK’s Contracts for Difference auction in
early 2026 secured 8.4GW of future offshore
wind capacity.
–Natural gas is expected to remain a key part of
the energy mix in the UK and US, playing a
critical role in managing renewable intermittency
and peak demand, as well as home heating.
–Electricity demand continues to rise in the UK
and US, driven by electrification of transport and
heat, and more recently, by the rapid growth in
data centres and advanced manufacturing.
These trends are reshaping long‑term network
planning and connection requirements.
–Battery storage capacity and other flexible
assets are reaching commercial scale, becoming
increasingly important for system balancing and
to avoid excess power going unused.
How we are responding
–National Grid is expanding and upgrading its
networks to keep pace with rising demand and
the shift to cleaner generation. In 2025/26, we
connected 1.8GW of new capacity across our
electricity networks.
–We are increasing the capacity of our electricity
and gas networks where demand is growing
fastest. In the UK, we are constructing a new
substation at Uxbridge Moor which is expected
to connect more than a dozen new data centres
to the grid from 2029.
–We are enabling our customers to connect and
operate flexible assets including solar, storage
and other technologies. In New England, we are
piloting new technology to help customer assets
come online faster and adjust output at times of
grid stress.
Techno pp14.jpg
Bus_Environ_Tech_Icon.gif
Technology
and innovation
Technology and innovation are
unlocking new ways to plan, build,
operate and maintain our
networks. They are transforming
the customer experience with
smart meters, flexible services and
better billing. AI is reshaping every
aspect of our business,
accelerating our ability to plan,
respond and deliver across our
electricity and gas networks.
Impact on our industry
–AI is creating opportunities to improve
operational efficiency across the value chain,
through enhanced grid intelligence, predictive
and autonomous maintenance, and customer
service. Across our operating areas, AI adoption
continues to accelerate, with increasing agentic
and autonomous applications.
–Grid-enhancing technologies, such as smart
sensors, are unlocking capacity on the existing
network by allowing optimisation of how much
electricity can be safely carried on power lines at
any moment.
–Customer-facing digital platforms are enabling
customers to manage their energy, lower bills
and track real-time outages. Utility companies
are responding with better apps and smart
software.
How we are responding
–We are upgrading and operating our
infrastructure with state-of-the-art technology
including dynamic line rating, digital twins and
drones. These technologies are transforming
how we plan and operate the network, easing
constraints and supporting faster connections.
–In the UK, we have installed dynamic line rating
technology on more than 600 km of electricity
transmission infrastructure, which has saved
£21m in constraint costs over the last five years.
–We are leveraging AI technology across our
businesses. Our collaborations with Emerald.AI
and GridCARE are helping to unlock additional
grid capacity and supporting our large load
customers, including data centres, to connect
faster. Our partnership with Rhizome helps us
identify and prevent wildfire risks across our
networks in the US and UK.
National Grid plc Annual Report and Accounts 2025/26
15
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Our business environment cont.
Global pp15.jpg
Bus_Environ_Global_Icon.gif
Global
uncertainty
Economic and political uncertainty
continues to impact energy supply
around the world, making it more
important to focus on resilience
and security.
Impact on our industry
–Global conflicts are increasing uncertainty across
the energy landscape and countries are
refocusing on domestic energy security.
–Oil and gas markets remain volatile, as the UK
and Europe phase out Russian gas imports and
supply from the Middle East becomes
unpredictable.
–Trade disputes are increasingly unpredictable
with new tariffs impacting global trade and
supply chains and creating challenges for major
energy infrastructure projects.
–Transmission and distribution systems are under
pressure from physical and cyber security
threats.
How we are responding
–We remain focused on delivering resilient and
secure infrastructure – helping to reduce the risk
of disruption for the communities we serve.
–We participate in key working groups including
the Energy Networks Association in the UK and
the Edison Electric Institute and American Gas
Association in the US, to advocate for policies
that deliver a smooth energy transition.
–We are building resilience in our supply chains.
In the UK, our new supply chain partnership
model is propelling a c.£8 billion programme of
substation upgrades by providing exclusive long-
term contracts to regional suppliers.
–We are supporting the Northeast Supply
Enhancement (NESE) project to expand natural
gas capacity in Downstate New York,
strengthening energy reliability and supporting
economic growth for homes and businesses.
–We build resilience against the increase in
physical and cyber threats into our networks and
operations.
Affordability NEW pp15.jpg
Bus_Environ_Afford_Icon.gif
Affordability
and reliability
Affordability and reliability are
shaping customer and regulator
expectations of energy networks.
Households feel pressure from
persistently higher bills, while
business and industry navigate
increasing costs which impact
growth. Meanwhile, regulators are
strengthening their focus on
resilience and reliability of supply
as electricity demand grows,
extreme weather events intensify,
and systems become more
dependent on variable renewables.
Impact on our industry
–Customers are facing sustained pressure from
higher energy costs and inflation across many
consumer goods. Affordability remains at the
forefront of public expectations and policy debates.
–Grid reliability faces a dual challenge of ageing
infrastructure which requires accelerated
replacement while simultaneously absorbing
rapid growth in intermittent generation, large
demand loads, and flexible assets. The scale of
investment required to maintain and expand the
network is increasing, and customers expect
services that can withstand extreme weather
and rising peak demand.
How we are responding
–Since 2023, NGV’s subsea interconnectors have
saved UK customers more than £1.65 billion by
importing electricity from Europe, compared to
generating the same power from gas in the UK.
–In Upstate New York, we are offering $290
million in bill discounts and energy efficiency
improvements for income-eligible electric
customers. In New England, we provide eligible
low-income customers up to 70% off their bills.
–Our UK transmission network had a reliability
rate of 99.99999%. Since 2024, we have
replaced or refurbished over 1,000 assets
including transformers, switchgear and cables.
–On Long Island, New York, we provide reliable,
affordable electricity and critical support to the
tightening electric system. National Grid
Generation (operated by NGV) owns and
operates 3.8GW of power generation – about
65% of the island's total generating capacity.
–We prevented over 19 million minutes of
customer outages in Massachusetts and
13.5 million minutes in Upstate New York by
deploying fault location, isolation and service
restoration technology on our networks.
National Grid plc Annual Report and Accounts 2025/26
16
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Performance against our strategic priorities
We have been
guided by five
strategic priorities   
in 2025/26
Read-more-arrow.gif
See our key performance indicators on page 26 — 29
Read-more-arrow.gif
See our business units on page 18 — 22
Business environment links
Bus_Environ_Energy_Icon.gif
Energy supply and demand
Bus_Environ_Tech_Icon.gif
Technology and innovation
Bus_Environ_Global_Icon.gif
Global uncertainty
Bus_Environ_Afford_Icon.gif
Affordability and reliability
Strat-Link-No1_blue.gif
Enable the
energy transition
Our networks play an important role in the energy transition.
We work with policymakers, regulators and the wider industry
to shape policy and regulatory frameworks needed to reach
shared energy objectives.
1.8GW
of new energised capacity
connected across our power
networks in 2025/26
Business environment:
Bus_Environ_Energy_Icon.gif
Bus_Environ_Tech_Icon.gif
Bus_Environ_Afford_Icon.gif
KPIs
–Green capital expenditure
–Climate change
–Scope 1, 2 and 3 emissions
2025/26 achievements
–We connected 1.1GW of energised renewable capacity to
our networks across the UK and US.
–In UK ET, we accepted Ofgem’s RIIO‑T3 Final
Determination, locking in a 2026–31 framework that enables
major expansion of our network and supports plans to
nearly double capacity. The T3 contract incentivises timely
completion of strategic projects and innovation.
–In UK ED, we responded to Ofgem's ED3 Sector Specific
Methodology Consultation, highlighting that transforming the
UK’s energy system will require investment at an
unprecedented scale, supported by a regulatory framework
that enables economic growth, decarbonisation and strong
customer outcomes.
–In New England, we secured Massachusetts Department of
Public Utilities approval for the cost recovery of Electric
Sector Modernization Plan projects, balancing customer
affordability with the state’s clean energy objectives.
–In New York, we gained approval from our regulators for
new rates at Niagara Mohawk and our Long-Term Gas Plan,
supporting greater renewable integration and planning for
the Northeast Supply Enhancement pipeline.
–NGV announced the world’s first 100% hydrogen-fuelled
commercial linear generator at Northport power plant.
Strat-Link-No2_blue.gif
Build the networks
of the future now
We are scaling a once-in-a-generation increase in network
capacity to connect and transport electricity. We are
modernising our electricity networks to improve capacity,
visibility, security and reliability, and drive economic growth.
We will ensure the safety and reliability of our gas networks.
at least £70bn
cumulative capital investment
over our five-year financial
framework to 2030/31
Business environment:
Bus_Environ_Energy_Icon.gif
Bus_Environ_Tech_Icon.gif
Bus_Environ_Afford_Icon.gif
Bus_Environ_Global_Icon.gif
KPIs
–Group capital investment
–Asset growth
2025/26 achievements
–In UK ET, we advanced major construction activity across
our portfolio, progressing delivery of the transmission
infrastructure required to connect new generation capacity
at pace.
–In UK ED, we added 250MVA of capacity to our distribution
network and are on track to deliver an increase in capital
investment of over £100 million versus prior year.
–In New England, we established strategic contractor
partnerships to accelerate timelines, reduce risk, and lower
costs across more than $3 billion of planned capital work
over the next five years.
–In the US, we have cumulatively installed over 2 million smart
meters – covering 68% of customers in Upstate New York
and 35% of customers in New England.
–NGV is developing projects in the UK and US which will
contribute to future capital investment. In the UK, NGV
recently gained agreement on a regulatory framework for its
LionLink hybrid interconnector project, which is planned to
be delivered in partnership with TenneT. In the US, in
conjunction with partners NY Transco and NY Power
Authority, NGV are engaged with communities to gain
support for NY Propel, a high-voltage enhancement to New
York's electricity grid.
National Grid plc Annual Report and Accounts 2025/26
17
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Performance against our strategic priorities cont.
Strat-Link-No3_blue.gif
Deliver for
customers
We aspire to provide excellent service to all our customers,
ensuring they can connect to the network in a timely fashion,
that their energy provision is reliable, and that we are easy to
do business with.
99.9%
reliability across
our UK and US
electricity networks
Business environment:
Bus_Environ_Energy_Icon.gif
Bus_Environ_Tech_Icon.gif
Bus_Environ_Afford_Icon.gif
Bus_Environ_Global_Icon.gif
KPIs
–Network reliability
–Customer satisfaction
2025/26 achievements
–Our UK and US networks maintained a high level of service
reliability. Our UK transmission network had just one loss of
supply event, the lowest number in ten years.
–In UK ED, we are connecting new sources of renewable
low-carbon generation to our network, increasing the total
amount across our region to over 14GW. Our Vulnerability
Strategy has supported over 21,000 customers to save
£22m on their bills in 2024/25.
–In UK ET, we drove Connections Reform with NESO,
establishing a new delivery pipeline and prioritisation
framework intended to speed up connections and to enable
more efficient delivery of the transmission capacity required
for Clean Power 2030.
–In the UK, we modernised our contact centre by deploying
Amazon Connect, improving service speed and
management of service restoration after unplanned outages.
–Across New York and New England, we replaced 315 miles
of leak prone gas pipe.
–In the US, we expanded access to emergency bill
assistance, home weatherisation and energy usage
education by partnering with more than 10 local
organisations in New York and Massachusetts.
Strat-Link-No4_blue.gif
Operate safely
and efficiently
To deliver our part in a changing energy system, we are
transforming our internal processes, strengthening our
customer focus and sharpening our commercial edge. We are
investing in the capabilities we will need in the future and our
ability to operate safely remains our top priority.
0.11
lost time injury
frequency rate
LTIFR)
Business environment:
Bus_Environ_Tech_Icon.gif
Bus_Environ_Afford_Icon.gif
KPIs
–Group LTIFR
–Underlying EPS
–Group RoE
2025/26 achievements
–In UK ET, we improved operational efficiency by
modernising how the network is controlled, including
upgrades to our transmission control centre, alongside
innovations including drones, use of AI, and dynamic line
rating, the latter of which has saved £21m in constraint
costs over the last five years.
–During Storm Goretti, our UK ED business dealt with over
1,300 incidents and restored approximately 246,000
customers across the region. We also made over 97,000
proactive calls to the Priority Service Register (PSR).
–Our New York and New England gas systems performed
well during the extended winter storm season, keeping our
customers warm during heavy snow and hurricane-force
winds. Our power restoration efforts were recognised with
Edison Electric Institute (EEI) Emergency Response Awards.
–In NGV, our UK interconnectors delivered 90% availability
across the fleet (up from 86% in 2024/25) and provide a
total import capacity of 7.8GW.
–Our LTIFR stood at 0.11, compared with 0.10 in 2024/25
and against our Group target of 0.10. In response, we have
implemented targeted Group and business unit initiatives to
strengthen risk awareness, leadership engagement and
control effectiveness.
Strat-Link-No5_blue.gif
Build tomorrow’s
workforce today
Delivering on our ambitions requires one big team. We're
developing and recruiting for the skills and roles we need so
we can build tomorrow's workforce today. From apprentices
to leaders, we're creating the place to develop a career that
positively impacts energy infrastructure and the planet.
703
graduates, apprentices
and interns welcomed
in the UK and US
Business environment:
Bus_Environ_Energy_Icon.gif
Bus_Environ_Afford_Icon.gif
KPIs
–Employee engagement index
2025/26 achievements
–Across the UK and US, we welcomed 3,790 new employees
during the year.
–All new starters receive training on our mission, values and
standards, supported by role-appropriate technical and
leadership development.
–Over half of vacancies continue to be filled through internal
moves and promotions, reflecting our strong focus on
developing and retaining talent.
–In response to the scale and complexity of our capital
program, we are working with the University of Oxford
and the Saïd Business School to strengthen project
management capability, improve delivery at scale and
reduce risk across our major infrastructure programmes. 
–Employee feedback matters and all permanent staff are
invited annually to share their views on working at National
Grid. Our employee engagement score remains strong
at 81%.
National Grid plc Annual Report and Accounts 2025/26
18
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Our business units
Business_Units_UK_ET_NEW.jpg
UK
UK Electricity
Transmission
Highlights
–Agreed the RIIO T3 price control, securing the regulatory
framework for April 2026–March 2031 and enabling up to
£31bn of capital investment.
–Delivered 2025/26 financial results in line or ahead of
expectations, with underlying operating profit up 18% year
on year and capital investment up 46%.
–Started construction of three new or significantly expanded
substations, including Uxbridge Moor, which is supporting
multiple data centre connections and is expected to be the
largest capacity substation in the UK.
–Launched the Electricity Transmission Partnership (ETP) to
strengthen supply chain relationships, capacity and
productivity, with c.£1.7bn already allocated to partners
under the framework.
Looking ahead
–Make submissions to Ofgem across the various stages of
the reopeners process for up to £14bn of additional funding
to deliver new connections and system reinforcements.
–Work closely with customers and industry partners to deliver
Connections Reform.
–Connect up to 35 GW of generation and 19 GVA of demand
through RIIO T3, supporting economic growth and
decarbonisation.
–Deliver the ASTI portfolio, enabling power flows from 50GW
of offshore wind across our network.
–Go live with our next generation Electricity Control Centre
and SCADA system.
Investment
Over the course of 2025/26, we have delivered £4.37bn of capital
investment. We are working to deliver up to £31bn capital investment
in our RIIO-T3 investment plan, acting as an engine for growth and
powering the country through the shift to a cleaner economy.
The volume of investment planned over RIIO-T3 will stretch our
supply chain, with transmission owners around the world upgrading
their grids. In July, we launched our Electricity Transmission
Partnership (ETP) to help power Britain’s clean energy future. This is
designed to unlock long‑term supply chain capacity and skills across
England and Wales. The ETP remodels how we engage with
suppliers, moving to a longer-term collaborative approach that builds
strong regional partnerships and rewards partners for high-quality
performance over time. It will accelerate the delivery of vital
substation infrastructure across England and Wales and support the
UK’s clean energy transition, with c.£8bn of substation construction
work to be awarded over the RIIO-T3 period across c.130 projects.
Work on our Accelerated Strategic Transmission Investment (ASTI)
projects continues at pace and the primary supply chain is now in
place for all 17 ASTI projects. We have made good progress on the
six ASTI projects where construction commenced in 2024/25. Our
ASTI portfolio is crucial to a lower carbon energy future and we are
working to minimise the carbon emissions from construction while
balancing that with the cost to the customer and delivery at speed.
We now model future emissions so that we can take action to reduce
our impact on the environment without delaying programmes.
Innovation
We are building a brand new, state-of-the art control centre to
manage the transmission network of tomorrow. This will reinforce
network resilience, uphold our world-class reliability standards and
power the clean energy transition. The control centre will use our new
SCADA (Supervisory Control and Data Acquisition) system, expected
to go-live in June 2027, providing real-time visibility and control of our
assets and allowing us to respond quickly to changing network
conditions and customer needs.
We are systematically testing new technologies and ways of working.
Over the course of 2025/26, we have worked with Hyperion Robotics
and the University of Sheffield on a UK‑first trial of low‑carbon
3D‑printed concrete substation foundations. If deployed across all
substations, this technology could save over 700 tons of concrete
and over 300 tons of CO₂ over ten years. In addition, we energised
over 300 km of Dynamic Line Rating (DLR) technology in 2025/26
and installed a further 300 km to enable the flow of more renewable
generation. Digital (weather-based) and sensor-based DLR has saved
consumers over £23.4m over the year and £230m over RIIO-T2. We
plan to install a further 260 km of DLR in 2026/27.
Customers
We are connecting new energy users as well as new sources of
renewable and flexible power to deliver secure, reliable and
increasingly decarbonised energy. Over the course of 2025/26, we
connected Britain’s largest solar array in Kent and the nation’s
biggest battery energy storage system at Tilbury substation.
We have long advocated for reform as critical to achieving the UK
Government’s Clean Power 2030 ambition. However, there are key
dependencies outside ET’s direct control. This year Ofgem has
approved proposals from the National Energy System Operator
(NESO) to reform Britain’s connection arrangements and prioritise the
energy projects that are most ready and most needed to meet the
country’s clean power targets. In addition, NESO has now published
the new connections pipeline, including details of the strategic
alignment of generation technologies to the UK Government’s Clean
Power 2030 capacity targets. We continue to work closely with
NESO to support the implementation of Connections Reform and are
now taking major steps towards having a better view of the future
needs of the transmission network.
Reliability and safety
The reliability of our network remains world-class. Network reliability was
99.99999%, with just one Energy Not Supplied event, the lowest number
in ten years. This is underpinned by delivery of asset health interventions
and maintenance compliance. Our new Enterprise Asset Management
(EAM) platform will support the transformation of our asset management
capabilities and management of an intelligent network with granular asset
data and a shared view of risk and total cost of ownership.
As we grow, maintaining a strong safety culture and ensuring
everyone is competent and confident in their roles is essential. We
narrowly missed our LTIFR target (0.11 vs a 0.10 target) but have
worked with our supply chain to enable growth and delivery while
embedding safety compliance, best practice and innovation.
People
Delivery of the energy network of tomorrow will require a significant
expansion of our workforce. We’ve made great progress in attracting
new talent. Our permanent headcount is now 4,718, with 712
experienced hires and 261 graduates and trainees joining over the
year. We’re investing in the future and expanding our training and
authorisation programmes. This year we have created new pathways
for colleagues to build critical skills, gain the right authorisations, and
take on work that matches their experience.
Read-more-arrow.gif
Read more about our business units on page 220
National Grid plc Annual Report and Accounts 2025/26
19
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Our business units cont.
ResponsibleBus_UK_ED 7May.jpg
UK
UK Electricity
Distribution
Highlights
–Maintained high Broad Measure Customer Satisfaction
score of 9/10.
–Our Vulnerability Strategy has supported over 21,000
customers to save £22m on their bills in 2025, and our
Winter Campaign drove a 71% increase on Priority
Services Register impact.
–Increased the total amount of generation connected to
our network to over 14GW.
–Enabled 120,000 low-carbon technology (LCT)
connections, including a 30% increase in EV chargers.
–Delivered a material increase in our Distribution System
Operator’s (DSO) flexibility market offerings – registering
309,514 of flexibility assets and securing 3,064MW of
flexibility capacity available to dispatch.
–The EQUINOX trial, one of the UK's largest domestic
heat pump flexibility programme, delivered 8,000+ heat
pumps into business-as-usual flexibility markets
alongside Octopus Energy and Scottish Power.
Looking ahead
We remain focused on developing a strong, region-led ED3
business plan for the period out to 2033 that delivers for
customers, supports growth, and enables the region’s net
zero transition in an efficient and affordable way. We will
continue our engagement with customers, communities
and stakeholders as we refine our proposals, ahead of
submitting our final ED3 business plan to Ofgem in
December 2026.
Investment
Every day, we work to provide safe, reliable electricity, connect
customers to the energy they need, and create the network capacity
required for a cleaner, more flexible energy system in an evolving
climate and market.
In 2025/26, we remained focused on investing at pace to expand
capacity and enable the region’s growth and net zero ambitions. We
delivered record capital investment, up 13% year-on-year. We are
connecting new sources of renewable low-carbon generation to our
network, increasing the total amount across our region to over 14GW
and increased capacity in our secondary network by 250MVA (a 39%
increase on the previous year). We also continued to shape the
evolving regulatory framework, responding to Ofgem’s ED3 Sector
Specific Methodology Consultation and submitting Early Proposals
that emphasised the need for focusing on customers’ needs and the
role of the DSO as we deliver unprecedented investment levels to
support the UK’s clean power transition. We are pleased that seven
of these early proposals have been taken forward by Ofgem.
Innovation
Innovation is at the heart of our strategy to deliver greater value to
customers. Through initiatives such as the deployment of monitors
across the low-voltage network, we are enhancing network
management and swiftly locating faults. Our adoption of AI
technologies is specifically targeted at improving customer
experiences, with predictive analytics forecasting scores for customer
service, automated curtailment reporting that will streamline project
lifecycles, and an AI-powered chatbot making data on our public data
portal more accessible and understandable. Our use of AI is also
supporting improvements in our DSO, ensuring the final outputs
better meet customer expectations, which include visibility and
access to our flexibility markets and products that have grown
significantly this year. These advancements collectively demonstrate
our ongoing commitment to utilising innovation to unlock customer
benefit.
Customers
UKED plays a vital role in keeping over 8 million homes and
businesses powered and supporting the region’s growth. In 2025/26,
we placed a strong emphasis on enhancing customer service and
engagement. We achieved a Broad Measure Customer Satisfaction
score of 9/10, thanks in part to the modernisation of our contact
centre through the roll-out of Amazon Connect and the complete
digitisation of agent knowledge with a new knowledge management
platform. We also improved customer journeys for unplanned
outages and connections, making it simpler for customers to access
information and support whenever they need it.
During the year, we responded proactively to a number of severe
weather events, mobilising teams to restore supplies safely and
keeping customers informed throughout. Notably, we acted quickly
during Storm Goretti, one of the worst storms on record to
specifically hit the South West. The South West saw winds of over
90mph, the biggest storm in the region for two decades. We
recorded over 1,300 incidents related to Goretti, with approximately
246,000 customers impacted; impressively, 73% had their supply
restored within 24 hours.
Our commitment to customer engagement extended beyond
immediate service improvements. Ahead of ED3, we launched our
BIG Conversation initiative, engaging directly with customers and
stakeholders, and established our Independent Stakeholder Group to
ensure our business plan is customer led and reflects regional
priorities. Furthermore, our largest ever winter campaign achieved
record engagement, driving a 71% increase on Priority Services
Register impact and in 2025, we earned the accolade of Campaign
of the Year at the Energy Awards 2025.
Reliability and safety
Maintaining a safe, resilient and reliable network remains central to
our 2025/26 performance. We delivered network reliability of
99.98795%. We strengthened our safety culture and learning,
training operational leaders and safety professionals in incident
investigation and root cause analysis to enhance the quality of
investigations and the actions that follow. We also made progress on
safety performance, with our LTIFR decreasing year-on-year as we
continue to work towards our strong safety target of less than 0.10.
People
We continued to invest in our workforce, building the capability and
capacity needed to deliver a safe, reliable and growing regional
network. We strengthened our teams through targeted recruitment
and development, supporting colleagues to build the skills required
for an increasingly complex energy system and the delivery of our
ambitious investment programme.
Read-more-arrow.gif
Read more about our business units on page 220
National Grid plc Annual Report and Accounts 2025/26
20
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Our business units cont.
ResponsibleBus_US_NY 7May.jpg
US
New York
Highlights
–New York delivered strong performance across its 26,400
square mile service territory. We met or exceeded key reliability
targets, delivered record gas throughput during extremely cold
temperatures, and continued to invest in a smarter and more
reliable energy system for our customers.
–The Public Service Commission (PSC) unanimously approved
Niagara Mohawk’s joint proposal, establishing a three-year
electric and gas rate plan. The agreement authorises
approximately $5.5 billion in capital investment, delivers more
than $290 million in bill discounts for income eligible customers,
and strengthens Climate Leadership and Community
Protection Act (CLCPA) aligned grid modernisation and storm
resilience.
–In September, the PSC affirmed that the proposed Northeast
Supply Enhancement (NESE) project is necessary to enhance
reliability and resilience of the downstate gas system. We also
helped shape the New York State Energy Plan, which
recommended a diversified approach that expands renewables
and invests in electric and gas infrastructure.
Looking ahead
Our priorities are clear: delivering safe, reliable, affordable
energy to the millions of customers who depend on us every
day; raising the bar on customer satisfaction; executing our
capital programme efficiently and safely; accelerating the pace
of connecting new customers to our networks; and advancing
regulatory and policy outcomes that serve the long-term
interests of both our customers and business – all the while
maintaining disciplined investment and continuing to
modernise how we operate.
Investment
We delivered approximately $4.6bn in capital investment, up $440m
year-over-year, and remain on track against our $23bn five-year
capital framework. Under the approved KEDNY and KEDLI rate
plans, we replaced over 220 miles of leak prone pipe to modernise
gas infrastructure. The Upstate Upgrade progressed, with Smart Path
Connect energised, enabling large-scale renewable interconnections
and strengthening transmission resilience. Climate Leadership and
Community Protection Act (CLCPA) Phase 1 and 2 are progressing,
with major construction and material contracts awarded, ready to
support renewable growth and improved reliability for our 1.7 million
upstate customers.
Innovation
Innovation centred on modernising operations for our workforce. We
launched Gas Business Enablement in Downstate New York,
streamlining daily work, improving field execution, and elevating
customer interactions by embedding digital innovation across gas
operations. We successfully deployed horizontal directional drilling at
Greenpoint LNG facility using a laser guided boring machine to
complete a fully trenchless installation of foundation heating elements
beneath an active LNG tank. This approach minimised disruption,
maintained operational integrity, and enhanced long-term reliability.
In our electric business, we exceeded deployment targets for fault
location, isolation and service restoration (FLISR), reducing customer
minutes interrupted by more than 13.5 million and supporting over
290,000 customers. We reduced interconnection times for electric
vehicles and distributed energy resources (DERs) by 10% and
advanced remote sensing, including drones for data capture and light
detection and ranging (LiDAR) for vegetation management.
The gas business leveraged advanced technologies to enhance
pipeline inspection. With the use of robotic internal inspection tools,
we can assess pipelines in previously inaccessible locations, reducing
inspection costs while strengthening reliability and system integrity. In
response to recent federal rulemaking, we have also been an early
adopter of non‑destructive technologies that determine pipeline
material properties without physical sampling, conserving resources
and supporting compliance with evolving regulatory requirements.
We have made strong progress in advancing our approach to large
load growth where demand from data centres and advanced
manufacturing continues to increase. We are focused on accelerating
speed to power through a combination of interconnection process
improvements, digitising the customer connection journey, and
flexible connections.
This year we also launched the Kraken programme, a cutting-edge
customer information and relationship management platform. This
innovative step forward will transform the way we interact with and
serve all of our US customers, driving significant advances in
operational efficiency and service quality.
Customers
We earned three Edison Electric Institute (EEI) Emergency Response
Awards for restoration efforts following severe storms in Upstate New
York. We responded to twelve major storms, restoring service for
95% of impacted customers within 7.94 hours.
We launched an after-call survey via text message to capture real-time
customer feedback and improve digital experience. We continue to
install Advanced Metering Infrastructure (AMI), with over 1.5 million
meters now completed, reaching 67% of Upstate customers. AMI will
improve outage response, customer insights, and operational efficiency.
Our Grid for Good Initiative delivers community benefits and during
the Annual Day of Service, 1,167 volunteers served at 38 events
across New York.
Reliability and safety
We delivered exceptional reliability performance, achieving Customer
Average Interruption Duration Index (CAIDI) and System Average
Interruption Frequency Index (SAIFI) targets for the 18th consecutive
year, the only New York utility in the state to do so. During the
extended historic cold winter in 2026, the downstate network
recorded six of the ten highest gas throughput days in KEDLI’s
history, underscoring resilience during peak demand.
Safety performance remained a core strength. The New York Electric
team achieved zero switching errors across nearly 110,000 switching
steps. We advanced proactive safety practices through Digital Job
Briefs, improving hazard recognition and consistency in field
execution. We deployed telematics across nearly 10,000 vehicles,
giving more than 1,500 daily users improved fleet visibility and safety
performance that outpaces peers. We ended the year with an LTIFR
of 0.11.
People
We continued to strengthen our workforce through meaningful labour
engagement and investments in our employees and workforce
pipeline. We reached a four-year collective bargaining agreement with
members of IBEW Local 1049, a labour union, providing stability and
reinforcing our commitment to collaboration and safety. We were
awarded the Bell Seal for Workplace Mental Health, the highest level
of recognition with Platinum status from Mental Health America.
Read-more-arrow.gif
Read more about our business units on page 220
National Grid plc Annual Report and Accounts 2025/26
21
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Our business units cont.
Business_Units_US_NewEngland RET.jpg
US
New England
Highlights
–Improved customer satisfaction (CSAT) significantly while
reducing complex connections cycle time by
approximately 10%.
–Announced partnership with Kraken to replace customer
platform.
–Replaced 95 miles of leak prone pipe.
–Completed construction of the VT-NH portion of the
A1B2 project, upgrading a transmission line in service
since 1909.
Looking ahead
Moving forward, our priorities remain: significantly
enhancing customer performance, obtaining regulatory and
policy results that benefit our customers, fulfilling our capital
commitments, and continuing to strengthen our safety
plans that support everything we do.
Investment
We invested $2.7 billion in 2025/26, $500 million more than last year,
to deliver a smarter, stronger, cleaner electric grid and to ensure the
safety and reliability of our gas system. To deliver projects in our
electric business, we stood-up strategic contractor partnerships for
transmission line, substation and distribution work that will allow us to
build long-term strategic relationships with selected suppliers. We
expanded our FLISR capability to 34% of customers, enabling self-
healing networks and avoiding over 19 million minutes of outages.
Construction was completed on the Vermont-New Hampshire portion
of the A1B2 asset condition replacement transmission project that is
upgrading a line which has been in service since 1909.
Natural gas plays an essential role in the Commonwealth’s all-of-the-
above energy strategy, providing a reliable foundation for economic
growth, helping to meet rising demand, and keeping customer bills
affordable. That energy mix requires continued investment to ensure
safety and reliability. We replaced 95 miles of leak prone pipe to
improve network safety and reduce emissions. Additionally, we
awarded the contract for the Tewksbury Vaporizer project, which will
replace ageing LNG vaporisation equipment, and are undertaking a
$283m investment to replace the South Yarmouth LNG storage tank,
both of which are essential to assure peak day reliability on the
natural gas system.
Innovation
We are using AI across the business. For example, we implemented
the NICE CX One platform in our contact centres and AI is now
evaluating 100% of calls and directly linking call quality to customer
satisfaction. In our electric business, we partnered with AiDASH to
use satellite imagery and AI to predict and remove vegetation threats,
reducing outages by nearly 30%.
This year we also launched the Kraken programme, a cutting-edge
customer information and relationship management platform. This
innovative step forward will transform the way we interact with and
serve all of our US customers, driving significant advances in
operational efficiency and service quality.
Customers
The business made significant gains in customer service and
operations: customer satisfaction (CSAT) increased significantly year
over year to 72% while after-call survey scores increased 22%, and
complex connections cycle time dropped by approximately 10% this
year, following last year’s 10% reduction. We also connected over
160MW of distributed energy resources, enabled the installation of
41MW of EV charging infrastructure, and have now installed nearly
500,000 AMI (smart meters). Our management of storms continues
to be recognised for exemplary performance, including an emergency
response award from the EEI. We continue to make day-to-day
operational improvements as we pursue breakthroughs aligned with
our broader strategy to transform the customer experience.
As part of our most recent electric rate case, we developed a first-of-
its-kind tiered income discount rate to better align bill support with
household need. We proposed a similar tiered income discount rate
rate for gas customers as part of our gas rate case, and are now
working with the Massachusetts Department of Public Utilities,
government, community agencies, and other utilities to develop a
standardised tiered low income discount programme for all
Massachusetts customers.
Reliability and safety
On our electric network, performance remains strong; our reliability
puts us in the 1st quartile for System Average Interruption Duration
Index (SAIDI) and the top of 2nd quartile for System Average
Interruption Frequency Index (SAIFI) when using Institute of Electrical
and Electronics Engineers national criteria. In the gas business, we
continued our high leak response performance with over 99% of
odour calls responded to within 60 minutes, compared to a statutory
target of 97%. The gas distribution system demonstrated its
importance to the region once again, performing well during a cold
and snowy winter with our LNG assets supporting over 20% of our
supply portfolio during periods of peak demand.
Safety remains fundamental to our operations. Incident rates remain
low overall, with LTIFR at 0.09 and an Occupational Safety and
Health Administration (OSHA) recordable rate of 1.64, approximately
14% below the three-year average. However, there is opportunity to
improve, and we will continue to mature high-energy awareness and
controls, bolster first-and second-line assurance, strengthen
contractor oversight and readiness, and improve learning quality.
People
Our Strategic Workforce Development team leverages partnerships
between community-based training providers, colleges and
universities and vocational technical schools to create and develop
short, medium, and long-term talent pipelines to fill critical roles. This
year we welcomed UMass Lowell, a Research 1 public university with
a deliberate strategy to partner with industry, to the cohort. Since
inception in 2023, approximately 150 graduates have joined our
company in critical roles, with 21 promotions in the current year.
Read-more-arrow.gif
Read more about our business units on page 220
National Grid plc Annual Report and Accounts 2025/26
22
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Our business units cont.
Business_Units_NG Ventures new v2.jpg
International
National Grid
Ventures
Highlights
–National Grid Ventures (NGV) develops, builds, and
operates energy assets and businesses in the US and
through its interconnectors business in the UK. It drives
growth for the organisation through investment in new
projects, with earnings underpinned by stable long-term
regulated frameworks and contracts.
–In 2025/26, NGV sold two of its businesses, National
Grid Renewables in the US for approximately $2.1 billion
and Grain LNG in the UK.
Looking ahead
NGV looks to continue to grow its businesses on both
sides of the Atlantic. This year, NGV signed memoranda of
understanding with both TenneT Germany and EirGrid to
explore developing hybrid interconnector projects with
Germany and Ireland respectively. NGV US continues to
progress its competitive transmission strategy with more
bids anticipated to be submitted as part of its new
partnerships in the coming year.
Investment
In addition to its large fleet of operational assets, NGV is actively
developing projects in the high-voltage transmission markets in both
the UK and the US, which will contribute to future capital investment.
NGV operates six HVDC interconnectors with a total capacity of
7.8GW, connecting the UK to France, Belgium, the Netherlands,
Denmark, and Norway. With LionLink, an upcoming major capital
project in partnership with TenneT Netherlands, NGV is planning for
the construction of a first-of-its-kind hybrid interconnector which
would connect the UK and the Netherlands. The project reached a
major milestone this year, gaining agreement for a regulatory
framework with Ofgem.
NGV US operates 3.8GW of conventional generation assets across
its sites in Long Island, New York. In addition, NGV US owns and
operates the Providence Rhode Island LNG peak-shaving plant which
provides approximately 2 billion cubic feet of LNG storage capacity,
along with vaporisation and liquefaction capabilities. NGV US owns
part of the NYTransco joint venture, which oversees $1bn worth of
transmission assets. NGV has a growing competitive transmission
business in the US and has formed its first partnerships to bid for
transmission projects across multiple transmission markets.
Innovation
This year, NGV US announced it will install the world’s first 100%
hydrogen-fuelled commercial linear generator at Northport power
plant to demonstrate the capability of H2 generation with a small-
scale pilot project. NYTransco is currently progressing Propel NY, a
capital project aimed at strengthening the electric connections
between downstate and upstate New York.
In the wake of rapidly growing energy demand across the UK and
Europe, NGV partnered with RenewableUK in chairing the new
Multipurpose Interconnector (MPI) task force, which published its
report and recommendations on how to enable delivery of MPIs in
January 2026. NGV is now working with industry and regulatory
leaders to progress the recommendations made in the report.
Customers
This year showed a strong performance for NGV in terms of
delivering for customers. In the US, the generation business was
required to deliver significant additional capacity as a result of the
seasonal cold weather this winter. From December 2025 through
February 2026, the generation fleet produced 36% higher energy
output than the prior four-year average, including a 260% increase
from 2025 in steam generation during the cold-snap that affected the
US Northeast from 23 January to 9 February 2026.
On 2 March 2026, NGV received a final FERC Order approving the
rate case settlement for the LNG facility in Providence, RI. The rate
case allows the facility to continue to add critical capacity to the
gas system.
February 2026 marked the energisation of the Dover Station
substation in Dutchess County, New York, which was delivered by
NGV’s NYTransco joint venture. This upgrade is allowing for
increased power flows and system improvements, demonstrating the
value of modernised energy systems.
Reliability and safety
Availability across the interconnector portfolio was 90%, exceeding
the full-year target with a 4% improvement from 2024/25. To further
improve reliability in the future, NGV is working towards modernising
the IFA interconnector in the coming years along with resilience
initiatives spanning the entire fleet.
In the US, Providence LNG is embarking on a modernisation effort to
improve the efficiency and reliability of the plant.
NGV operates with safety always top of mind for all colleagues,
across all business areas. LTIFR was on target this year at 0.10.
Across the organisation, efforts to centre leading indicators at the
heart of safety discussions have been adopted to foster a proactive
safety culture.
People
To support the progress of National Grid’s growth ambitions, NGV
utilises a broad mix of talent, from business originators to skilled
asset operators. NGV continues to build capability in the competitive
transmission space by bring in new talent and ensuring growth
opportunities for existing talent.
Read-more-arrow.gif
Read more about our business units on page 220
Other activities
Other activities primarily relate to National Grid Partners, the
corporate venture capital and innovation arm of National Grid, as well
as UK property, insurance and corporate activities. In 2025/26,
National Grid Partners invested in three new portfolio companies and
16 follow on rounds. We exited one company, Urbint, during the year.
We now have 41 active companies in the portfolio investments in five
strategic venture funds. We have invested more than $550 million to
date. Some examples of companies and technologies in our portfolio
include: LineVision (dynamic line rating technology), Sensat (capital
project design software) and Emerald.ai (demand flexibility software
for data centres). Looking ahead, we will continue to innovate and
invest in the latest technologies to support the Group.
National Grid plc Annual Report and Accounts 2025/26
23
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Our stakeholders
Strong stakeholder engagement
Read-more-arrow-clear.gif
Read our Section 172 Statement on page 85
drives our success
How we engage
Our stakeholder community continues to broaden and evolve, and engaging with them remains fundamental to our daily operations. We focus on timely, effective engagement on the issues and decisions that matter
most to them, with the right colleagues leading each interaction. This spans the full organisation – from our Board of Directors, who maintain regular dialogue with key stakeholders, to the working‑level teams who
support engagement on our day‑to‑day activities. The insights we gain through these interactions directly inform the decisions that shape and deliver our strategy. Structured reporting mechanisms ensure that
information flows seamlessly from stakeholders to the Board and its Committees, helping us understand what we are hearing and enabling us to act on it.
Customers
Why our customers are important to us
Customers are the heart of our business,
representing a diverse community that includes
residential customers and large and small
businesses. Regular and effective engagement with
them is essential to delivering what they need and
expect from us.
Interests
Our customer base, made up of longstanding
customers and an increasing number of new ones,
have wide ranging interests. However, they all
share an expectation that we will deliver efficient,
reliable and affordable service, with transparency
and fairness in how we work with them. We strive
to understand their needs and challenges, along
with how our activities impact their daily lives and
businesses.
Our engagement
–The Board and Group Executive Committee
actively engage on customer matters to better
understand their needs and perspectives and
leverage that feedback into improving customer
experience.
–Strategic account teams have gained
momentum in 2025/26, positioning themselves
as trusted advisors who bring innovative
strategic solutions that can deliver at speed to
accelerate customers’ expansion opportunities. 
–We lead or participate in industry initiatives to
find solutions for: general business planning,
expedited grid connections, and affordability
challenges faced by our customers.
Investors
–The Board receives regular updates on customer
matters and undertook two customer deep dives
during the year, including updates on the
implementation of the Kraken programme which will
enhance US customer experience and an
operational visit of the UKED customer call centre.
–Teams  across  the  business  engage  with
 customers on a day-to-day basis – in one-to-one
meetings and community forums – regarding
 connections, bill-related matters  and social
obligations.
Outcomes
–Our customer engagement helps shape what we
do both operationally and strategically.
Understanding our customers means we can
better meet their needs for new connections and
ongoing account management, and informs
longer-term policy.
–As companies increasingly adopt advanced
technologies, resilient, high-quality power and the
ability to timely connect new loads have become
paramount.
–In the US, our work with consumer advocates
continues to make a difference to many of our
customers’ ability to meet the rising challenge of
cost of living.
–In 2025 we launched our BIG conversation –
engaging with thousands of customers and
stakeholders on the future of their local electricity
network. This engagement will continue
throughout 2026/27 and is key to shaping our
future business plan.
Why our investors are important to us
We engage with equity and debt investors on our
strategy and performance. Their involvement
supports the investment needed for a resilient,
future-ready network and provides important
accountability — ensuring we remain transparent,
disciplined, and aligned with our long‑term
commitments.
Interests
Investors look to our financial and operational
performance as indicators of our capacity to
generate attractive returns and uphold
creditworthiness. They are also interested in our
Responsible Business commitments and reporting
to ensure their investments are sustainable, ethical
and responsible.
Our engagement
–During the year, the Chair, Chief Executive and
CFO met with institutional investors in the UK
and overseas as part of our comprehensive
investor relations programme.
–The Group Treasurer and Deputy Group
Treasurer met with Debt and Fixed Income
investors in the UK and overseas as part of our
debt engagement programme.
–Meetings followed our full and half-year results
and the announcement of our updated five-year
financial framework and acceptance of Ofgem’s
RIIO-T3 price control in March 2026.
–The Board engaged with shareholders at our
2025 AGM, which was held as a hybrid meeting
to enable participation both in person and online.
Shareholders were able to put questions to the
Board in advance of, or during, the meeting.
–The Board receives regular monthly updates on
investor relations matters from the Director of
Investor Relations, including the outcome of an
investor sentiment exercise which affirmed our
investor relations approach.
–Debt investors received an overview of our US
regulated businesses from the Group Treasurer
along with the Presidents and CFOs of our US
businesses.
–Held an investor event in May 2025 that shared
full-year results with a focus on major projects in
UK ET and New York.
Outcomes
–Through our engagement, investors understand
our investment case and have visibility of our
strategy, performance and financial strength. This
engagement helped us to efficiently access new
debt and equity funding during the period,
including £4.2 billion of newly issued senior debt.
–The Remuneration Committee considered
feedback from its engagement with investors in
relation to the Directors’ Remuneration Policy,
with 98.38% of voting investors voting in favour of
the Policy at the AGM.
National Grid plc Annual Report and Accounts 2025/26
24
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Our stakeholders cont.
Colleagues
Why our colleagues are important to us
We listen to and engage extensively with our
colleagues and with the bodies that represent them
through several channels and processes. This
enables us to understand their needs and
requirements and build a culture that not only
drives our performance and shapes our plans, but
also empowers colleagues to take ownership for
delivering results. Through fostering an inclusive,
supportive and collaborative environment, we
create the conditions for a skilled and motivated
workforce where everyone feels valued and able to
contribute to our shared success.
Interests
Colleague interests are wide-ranging. They have an
interest in company performance and what this
means for them individually, but also want to
understand – and play a part in – shaping our role
in the industry, contributing to our social impact,
and supporting the delivery of our strategic
objectives.
Our engagement
We continued our extensive programme of
colleague engagement in 2025/26. This included:
–Twice yearly live webcasts to all employees
hosted by the Chief Executive.
–Regular Chief Executive posts and interaction on
social media platforms.
–Regular all-hands calls hosted by members of
the Group Executive and senior management.
–The Chair visited two training facilities during the
year, one in the UK and one in the US.
–The Chair and members of the Board visited
operational sites in the UK and US, including a
segment of the ASTI transmission facilities under
construction in July and the Long Island Power
plant facilities in March, to observe work
underway and engage in small group
conversations with key team members.
–
Supply chain and delivery partners
–A series of colleague engagement events were
hosted by the Chair of the People &
Remuneration Committee to discuss reward
structures and talent development. Please see
page 95 for further information.
–Operational site visits by senior management.
–The Chief Executive and Chief People Officer
provided regular updates on employee matters to
the Board, including the results of our twice-
yearly employee engagement survey, Grid:Voice.
Outcomes
–Direct engagement informed Board challenge
and discussion, reinforced the importance of
visible leadership and open dialogue, and fed into
Safety & Operations Committee consideration of
safety reporting, contractor management and on-
site safety behaviours.
–Direct engagement enabled the Board to hear
directly from a broad cross-section of colleagues,
strengthening its understanding of workforce
culture, values and lived experience beyond
formal reporting.
–82% of colleagues took part in our Grid:Voice
survey in February, with an employee
engagement index score of 81% favourable. The
results and feedback helped to identify areas
where we could do more to support employees.
Read-more-arrow.gif
Read more in the Responsible Business
Committee report on page 106
Read-more-arrow.gif
Read more about Board engagement
with colleagues on page 95
Why our supply chain and delivery partners
are important to us
Working closely with our supply chain and delivery
partners is essential to delivering our long‑term
ambitions. Through strong partnerships and
consistent engagement, we share insights, drive
innovation, and build the resilience needed to meet
changing expectations. This coordinated,
transparent approach ensures a future‑ready
supply chain that supports effective delivery of our
commitments.
Interests
Effective communication and strong coordination
are essential to how we work with our supply chain
and delivery partners. Clear forward visibility and
longer‑term commitments help us plan and
support partners in building the skills and capacity
they need. Early alignment and consistent dialogue
foster collaboration and innovation, enabling us to
meet evolving needs and deliver successful
outcomes.
Our engagement
–Structured and timely engagement takes place
with strategic suppliers and contractors,
complemented by Executive-sponsored senior-
level engagement to foster collaboration and
discuss strategic issues facing the sector.
–Continued collaboration between UK operators
and suppliers through an industry skills and
workforce planning group, consisting of
representatives from key external partners, to
address the industry skills gap challenge
through a focus on critical specialist workforce
roles.
–The Board receives updates on our supplier
engagement programmes via business unit
updates during the year.
–
–We engage in detailed safety forums with
suppliers to drive industry-wide safety
performance.
–In New England, we established strategic
contractor partnerships to accelerate timelines,
reduce risk, and lower costs across more than
$3bn of planned capital work over the next five
years.
–In the UK we entered into a novel long-term
contracting relationship, the Great Grid
Partnership. Members of the Board visited with
the Great Grid Partnership in July 2025, including
presentations from partners to understand
strategic supply chain management.
–The Board considered and approved the Group’s
Modern Slavery Statement.
Outcomes
–Sharing key priorities with our supply chain and
gaining a better understanding of their needs
allows us to jointly manage continuity of supply
and shape our approach to future challenges,
such as the acceleration of investment required to
connect new sources of energy.
–Working with other energy network operators and
suppliers, we have contributed to the creation of a
comprehensive interim Electricity Networks Sector
Growth Plan published in December 2025 by the
Energy Networks Association (ENA) and BEAMA,
the UK manufacturing trade association for the
electrotechnical sector, setting out a collaborative
roadmap to shape national growth.
–We are signatories to the Prompt Payment Code
and encourage our suppliers to adopt the
principles of this code in their own supply chains.
National Grid plc Annual Report and Accounts 2025/26
25
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Our stakeholders cont.
Communities
Why our communities are important to us
We engage extensively with the communities
where we work, and with their representatives, to
understand their needs, enhance our contribution
to their wellbeing, and ensure we support them in
the most meaningful and appropriate ways.
Interests
Our communities need us to deliver energy safely
and reliably, while strengthening the positive
contributions our operations bring to their wellbeing
and offering meaningful support to the individuals
and communities who need it most.
Our engagement
–We engage extensively with local communities
as part of our major projects planning
consultations, and we use their feedback to
inform the proposals we submit for development
consent.
–During the year, Board members visited
operational sites and received updates on
community matters, including:
–strategic infrastructure projects and the RIIO-
T3 business plan submission
–a dinner with community, civic and policy
leaders in NYC to discuss policy
considerations, community needs, and how
National Grid could support positive
outcomes.
–On an ongoing basis, we develop and
implement safety programmes, and work with
first responders and communities, so that all
parties have a heightened awareness of how our
system operates and what we do to assure the
highest possible reliability and safety of the
public.
–We lead with listening and lived experience
through structured community feedback,
ensuring our approach is responsive and
informed.
Political and regulatory
–We build trust-based, inclusive partnerships with
local organisations and under-represented
groups to share ownership and strengthen long-
term outcomes.
–We use data and community insight to target
investments, improve decisions, and measure
social and business value.
Outcomes
–Our outreach programmes continue to support
economic growth and help upskill communities,
particularly in the most disadvantaged areas.
–During National Engineers Week, partners
across the US delivered hands-on Energy
Through Engineering activities, reaching more
than 1,500 students.
–In February 2026 we launched BioBus with the
Long Island Children’s Museum – a mobile lab
that will reach over 45,000 students annually.
–Consultation with communities and residents
near proposed UK infrastructure projects enables
us to shape proposals and progress projects.
–We’ve invested heavily in supporting vulnerable
customers and education programmes:
–21,000 customers supported to save £22
million via our fuel poverty programmes in UK
ED.
–5,000 people supported to save £4 million via
our Low Carbon Transition services.
–>100,000 education and STEM outreach
interactions in the UK ED region alone.
Why our regulators and political
stakeholders are important to us
We engage with regulators, governments and
other key political stakeholders to support the
regulatory and policy frameworks required to
deliver current and future energy needs. We work
closely with our regulators on rate cases in the US
and price controls in the UK.
Interests
The interests of our regulators and political
stakeholders are based around a common theme
– whether UK or US, state or federal – to protect
the interests of customers and to deliver a secure
and reliable energy future.
Our engagement
–Our Chief Executive has engaged with key
appointed and elected officials, including
Downing Street, the Federal Energy Regulatory
Commission (FERC), and key US Secretaries to
discuss energy security, infrastructure delivery
and innovation.
–Business unit executives and external affairs
leaders engage with state and local leaders, the
New York Public Service Commission, the MA
Department Public Utilities (MADPU), and
relevant agencies to inform and foster
communication so that rate cases, major
projects, and the regulatory environment are
meeting the needs of customers today and in
the future.
–Our US Federal Government Relations team
engages with Congress, the Trump
Administration, and federal agencies on
affordability, load growth, reliability, tax and
permitting.
–Members of the Board and UK executive and
working-level colleagues engaged with Ofgem
on UK ET’s RIIO-T3 business plan and the ED3
regulatory framework, and with the UK
Government on its policy agenda, including
planning, connections, resilience, supply chain
and skills.
Outcomes
In the US:
–Delivered stakeholder engagement plan in line
with the MADPU new public outreach
requirements for Gas Rate Case filing while
addressing heightened affordability concerns.
–Engaged with the MA Administration and
members of the legislature to inform the
development of energy affordability legislation
consistent with company priorities.
–Collaborated on the new State Energy Plan,
supporting our New York business unit strategy
and reinforcing the role of gas in an affordable,
achievable energy transition.
–Through joint advocacy and coalition building,
achieved the approval and permitting of the
Northeast Supply Enhancement (NESE) pipeline
to increase reliability and affordability in New York.
–Engaged with federal lawmakers on One Big
Beautiful Bill Act (OBBBA) to prevent corporate
tax policy that would negatively impact National
Grid.
In the UK:
–Supported planning reform, with the Planning and
Infrastructure Act becoming law in
December 2025. Specific to UK ED, the
Government has announced its intent to make
legislation changes following the Electricity
Infrastructure Consents, Land Access and Rights
consultation, which should speed up and reduce
costs of delivery for our customers.
–Delivered an interim Electricity Networks Sector
Growth Plan to boost jobs, supply chain
opportunities, and UK network investment.
–Supported the ongoing implementation of a new
regime for grid connections.
National Grid plc Annual Report and Accounts 2025/26
26
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Our key performance indicators
We use a range of
metrics to measure Group
performance. In 2025/26,
these metrics were aligned
to our five strategic priorities.
Link to remuneration
Remuneration of our Executive Directors, and
our employees, is aligned to the successful
delivery of our strategy. We use a number of
our KPIs and alternative performance
measures as specific measures in
determining the Annual Performance Plan
(APP) and Long-Term Performance Plan
(LTPP) outcomes for employees and
Executive Directors. These measures are
either specifically accounted for in
remuneration targets or considered as part of
a review of wider business performance.
Read more on page 107
Underlying EPS (p)
Group capital investment (£m)
Green capital expenditure (£m)
78.0p
£11,576m
£9,834m
2025/26
2025/26
2025/26
2024/25
2024/25
2024/25
2023/24
2023/24
2023/24
Link to strategy
Link to strategy
Link to strategy
Strat-Link-No1_grey.gif
Strat-Link-No2_grey.gif
Strat-Link-No3_grey.gif
Strat-Link-No4_blue.gif
Strat-Link-No5_grey.gif
No1_grey.gif
No2_blue.gif
Strat-Link-No3_grey.gif
No4_grey.gif
No5_grey.gif
No1_blue.gif
No2_grey.gif
Strat-Link-No3_grey.gif
No4_grey.gif
No5_grey.gif
Description
A measure of the Group’s profitability for the year
attributable to equity shareholders of the Group. It
excludes exceptional items, remeasurements, timing,
impact of deferred tax in UK regulated businesses
(NGET and NGED) and US major deferrable storms
(net of in-year allowances and deductibles) if these
exceed $100 million threshold in a year.
We expect underlying earnings per share
CAGR to be 8-10% from the 2025/26 baseline, 
aligned with our asset growth.
Description
Measures our annual investment into property,
plant and equipment, including capital
prepayments, intangible assets and equity
contributions to joint ventures and associates.
Investing in our assets helps to increase our future
revenue allowances.
We expect to invest at least £70 billion
between April 2026 and March 2031.
Description
Measures the amount of capital expenditure
invested in decarbonisation of energy systems and
considered to be aligned with the principles of the
EU Taxonomy for climate change mitigation and
adaptation activities. Green capital expenditure
excludes any capital prepayments and equity
investments in joint ventures and associates.
We expect around 85% of our £70 billion
capital investment between April 2026 and
March 2031 to be aligned with the principles of
the EU Taxonomy legislation.
Progress in 2025/26
Underlying EPS increased by 4.7p (6%) year-on-year
driven by strong performance across our regulated
businesses including new rate agreements in the
US, higher revenues from totex allowances driven
by investments in the UK and disciplined cost
efficiency across the Group. These more than offset
the impact of divestments, the increased number of
shares after the Rights Issue and the adverse
impact of the change in FX rates.
Progress in 2025/26
We delivered a record year of capital investment
driven by the ramp up of spend on Wave 1 ASTI
projects in UK ET and increased electricity distribution
and transmission investment in both New York and
New England (including CLCPA and Smart Path
Connect in New York and system capacity, asset
condition and programme spend in New England).
These were partially offset by lower investment in
NGV following the impact of divestments.
Progress in 2025/26
Green capital expenditure increased by £2.2 billion
to £9.8 billion, driven by investment in key
infrastructure projects. Green alignment for capital
expenditure increased to 88.5%, up from 81.1% in
2024/25, demonstrating continued progress in
aligning investment with the clean energy
transition. The share of green capital expenditure
as a proportion of group capital investment, which
includes capital prepayments and equity
contributions, was 85.0%.
Financial measures
APM-arrow_Dk-blue.gif
1
25
Read-more-arrow-clear.gif
Strat-Link-No1_blue.gif
Strat-Link-No2_blue.gif
Strat-Link-No3_blue.gif
Strat-Link-No4_blue.gif
Strat-Link-No5_blue.gif
Enable the energy transition
Build the networks of the future
Deliver for customers
Operate safely and efficiently
Build tomorrow’s workforce today
APM-arrow_Dk-blue.gif
Indicates an alternative performance measure
13
Read-more-arrow-clear.gif
National Grid plc Annual Report and Accounts 2025/26
27
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Our key performance indicators cont.
Group RoE (%)
Asset growth (%)*
Scope 1 and 2 GHG emissions (mtCO2e)
Scope 3 GHG emissions (mtCO2e)
9.8%
10.9%
7.5
29.5
2025/26
2025/26
2025/26
2025/26
2024/25
2024/25
2024/25
2024/25
2023/24
2023/24
2023/24
2023/24
Link to strategy
Link to strategy
Link to strategy
Link to strategy
Strat-Link-No1_grey.gif
Strat-Link-No2_grey.gif
Strat-Link-No3_grey.gif
Strat-Link-No4_blue.gif
Strat-Link-No5_grey.gif
Strat-Link-No1_grey.gif
No2_blue.gif
Strat-Link-No3_grey.gif
No4_grey.gif
Strat-Link-No5_grey.gif
No1_blue.gif
No2_grey.gif
Strat-Link-No3_grey.gif
No4_grey.gif
No5_grey.gif
No1_blue.gif
No2_grey.gif
Strat-Link-No3_grey.gif
No4_grey.gif
No5_grey.gif
Description
Group RoE measures our performance in
generating value for shareholders by dividing our
regulated and non-regulated financial performance,
after interest and tax, by our measure of equity
investment in all our businesses, including our
regulated businesses, NGV and other activities and
joint ventures.
We aim to optimise Group RoE through driving
performance across our operating companies.
Description
Maintaining efficient growth in our regulated and
non-regulated assets ensures we are well
positioned to provide consistently high levels of
service to our customers and increases our future
revenue allowances. This includes critical
investment on network safety and resilience and to
meet increased demand.
We aim to achieve Group asset growth CAGR
of around 10% to March 2031.
Description
We are delivering new infrastructure to enable the digital, electrified economies of the future. Our biggest
contribution to reducing greenhouse gas (GHG) emissions, both across society and in terms of our own
emissions, is what we do to enable the transportation and distribution of clean energy in the regions where
we operate. We understand the importance of partnership and are actively engaging with governments,
regulators, and the energy industry to help ensure the policy and regulatory frameworks required for future
investments in decarbonising the energy sector, and reducing our emissions, are in place.
We will continue to work towards our ambitious climate targets.
Progress in 2025/26
Group RoE has increased by 80bps year-on-year
due to increased regulated performance including
new rate agreements in the US, higher revenues
supported by increased allowances in the UK and
disciplined cost efficiency. This is partially offset by
reduced performance in our non-regulated
business following the divestments and increased
financing costs due to our increased capital spend.
Progress in 2025/26
Asset growth has increased by 190bps year-on-year
driven by growth across our regulated businesses
including ASTI investment and connections work in
UK ET, CLCPA investment in New York and GSEP
investment in New England.
Progress in 2025/26
Scope 1 and 2 emissions for 2025/26 were 7,511 ktCO2e, an increase of 1% from 2024/25. While this is a
decrease of 3% against our 2018/19 baseline it is outside of the range set out in our Climate Transition
Plan. The year-on-year increase is primarily due to increased Scope 1 emissions from our Power Generation
assets in New York, which provide critical system reliability. Scope 2 emissions have decreased year-on-
year, attributable to lower grid carbon intensity. Our Scope 3 emissions (excluding sold electricity) for
2025/26 as per our Science Based Targets initiative (SBTi) target were 26,833 KTCO2e, representing an
11% increase against our 2018/19 baseline. This increase is primarily due to increased capital investment in
constructing new energy infrastructure. You can read more about our GHG emissions and environmental
performance on pages 40 — 44. You can read more about the Task Force for Climate-related Financial
Disclosure (TCFD) and our wider sustainability activities on pages 53 — 68.
Financial measures
APM-arrow_Dk-blue.gif
88
74
Non-financial measures
62
50
* Normalised for the sales of NG Renewables and Grain LNG in the year.
National Grid plc Annual Report and Accounts 2025/26
28
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Our key performance indicators cont.
Group lost time injury frequency rate (LTIFR)
(LTIs per 100,000 hours worked)
Employee engagement index (%)
0.11
81%
2025/26
2025/26
2024/25
2024/25
2023/24
2023/24
Link to strategy
Link to strategy
Strat-Link-No1_grey.gif
Strat-Link-No2_grey.gif
Strat-Link-No3_grey.gif
Strat-Link-No4_blue.gif
Strat-Link-No5_grey.gif
No1_grey.gif
Strat-Link-No2_grey.gif
Strat-Link-No3_grey.gif
No4_grey.gif
No5_blue.gif
Description
Every day we strive to do the right thing, find a
better way, and make it happen. Safety is our
highest priority for our employees and the public.
One of our main safety indicators is LTIFR. This is
the number of worker LTIs per 100,000 hours
worked in a 12-month period (including fatalities)
and includes our employee and contractor
population.
Our aim is to achieve 0.1 or below lost time
injuries per 100,000 hours worked per year.
Description
Measures how engaged our employees feel, based
on the percentage of favourable responses to
questions repeated annually in our employee
engagement survey.
Our aim is for our employee engagement
metrics to remain at or above the high-
performing norm.
Progress in 2025/26
Safety is an important factor within decision
making, therefore tied to our Executive Directors’
remuneration, reflecting the expectation that safety
is an integral part of how we work at National Grid.
Our LTIFR stood at 0.11, compared with 0.10 in
2024/25 and against our Group target of 0.10. We
are disappointed in this result and in response, we
have implemented targeted Group and business
unit initiatives to strengthen risk awareness,
leadership engagement and control effectiveness. 
You can read more about our LTIFR performance in
the Responsible Business section (pages 38 — 52).
Progress in 2025/26
We run an employee engagement survey,
Grid:Voice, twice-yearly, to understand and act on
colleague feedback. This allows us to build a
culture that is purpose-led and results-driven, with a
great colleague experience. As a result, we
experience high engagement and strong advocacy,
above external benchmarks.
This year, 26,000 employees completed the survey,
which resulted in the highest response rate in six
years. Engagement scores remain strong and
leadership will continue to monitor to increase by
1% in line with the high-performing norm.
Non-financial measures
Network reliability and interconnector availability
99.9%
90%
2025/26
2025/26
2024/25
2024/25
2023/24
2023/24
Network reliability %
2025/26
2024/25
2023/24
UK ET
99.99999
99.99983
99.999998
UK ED
99.98795
99.98294
99.99261
NE ET
99.96594
99.98544
99.97549
NY ET
99.92740
99.84345
99.97168
NE ED
99.96434
99.97724
99.94327
NY ED
99.95060
99.94077
99.92823
Interconnector availability %
IFA interconnector
74.81
79.42
82.01
IFA2 interconnector
87.55
74.87
71.19
BritNed interconnector
99.97
75.60
98.00
Viking interconnector
95.96
91.75
N/A
NSL interconnector
95.22
94.96
95.87
Nemo Link interconnector
98.72
98.75
96.80
Link to strategy
Strat-Link-No1_grey.gif
No2_grey.gif
No3_blue.gif
No4_grey.gif
Strat-Link-No5_grey.gif
Description
Delivering network reliability is critical to our licence to operate. We achieve this through disciplined
capital investment aligned to demand and supply risks, robust network design and construction, targeted
maintenance and asset replacement, and well‑tested incident response plans. Reliability is measured
separately across each business area.
Progress in 2025/26
We continued our track record of delivering consistent network reliability for our customers,
demonstrating our continued investment in asset health and resilience. Overall Group network reliability
was 99.9%, consistent with both 2024/25 and 2023/24. Interconnector availability improved by 4% year-
on-year, closing at 90%, the maximum available for the year. This was driven by improved availability for
both IFA2 and BritNed, driven by decreased unplanned outages.
114
102
413
380
National Grid plc Annual Report and Accounts 2025/26
29
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Our key performance indicators cont.
Customer satisfaction
2025/26
2024/25
2023/24
Target
UK ET (/10)1
7.0
6.5
7.2
7.7
UK ED (/10)1
9.01
8.98
8.97
9.12
NE – (%)2
72.2
53.9
57.5
67.33 3
NY – (%)2
72.8
61.1
64.5
73.23 3
Link to strategy
Strat-Link-No1_grey.gif
No2_grey.gif
No3_blue.gif
No4_grey.gif
Strat-Link-No5_grey.gif
Description
We measure customer and stakeholder satisfaction, while also maintaining engagement with these groups
and improving service levels.
Progress in 2025/26
In UK ET, we follow the Quality of Connections Incentive and our score demonstrates a positive shift
compared to last financial year, marked by significant industry reform and rapid change. We have
strengthened and developed our workforce, invested in digital transformation capabilities and upheld
customer-centric principles in a dynamic and unpredictable environment. NESO initiated reforms to the
existing connections queue that will aim to help UK ET deliver faster, fairer and more strategic grid
connections for existing and future customers.
In UK ED, we continue to deliver year-on-year improvements as we strive to achieve our target with
several connection initiatives driving benefits for customers during the year.
In the US, satisfaction levels improved over the course of the year, reflecting continued progress in how
we serve and support our customers. At the same time, colder weather and increased energy use
contributed to higher bills, creating affordability pressures.
Read more about our customer satisfaction scores in the Responsible Business review on pages 38 — 52.
Non-financial measures
1.The UK ET and UK ED scores are included as part of the regulatory framework.
2.Customer trust metrics are based on survey questions that differ year‑on‑year, with the current year reflecting overall experience and the
prior years focusing on trust of advice provided. The current year score is a weighted average from four survey inputs that run
continuously across both residential and commercial customers throughout the year. Please see our reporting methodology on the
Responsibility section of our website for details.
3.2025/26 New York and New England targets for the newly introduced Customer Satisfaction metric.
Risk management p2 v6.jpg
National Grid plc Annual Report and Accounts 2025/26
30
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Internal control and risk management
The Board is committed to effective risk management to
deliver our strategy, protect our people, reputation
and assets, and safeguard the interests of our stakeholders.
Our Enterprise Risk Management (ERM) Framework
National Grid is exposed to a variety of uncertainties (threats and opportunities) that could have a
material effect on the Group’s financial position, our operations, our reputation and stakeholder
interests; represented by our Group Principal Risks. These uncertainties are managed through our
ERM Framework and system of internal control. We maintain and monitor the application of the
Framework throughout the year and formally assess its effectiveness annually. This ongoing
oversight, alongside continuous improvement, enables us to respond effectively to changes in the
internal and external environment and to inform our Group Principal Risks and related risk
management activities.
Our risk management and internal control activities are delivered via a “Three Lines” model:
Risk, Controls and Assurance Governance:
–Identify and monitor the Group Principal Risks and emerging risks across the Group
First Line:
Business units
Second Line:
Risk and Compliance functions
–Identify and assess risks
–Manage day-to-day operational risks
–Apply risk appetite, delegated authorities,
policies, procedures and codes of conduct
–Design and operate internal controls and
other mitigation measures
–Monitor and report risks through relevant
reporting and escalation processes
–Risk and compliance oversight
–Design and/or enable risk management
processes across the Group and
responsible for continuous improvement
–Provide risk expertise, advice and support
–Monitor and assure compliance with
policies, standards and the ERM process
–Report to the Board and Group Executive
Third Line:
Internal Audit
–Internal audit (supported by outsourcing or co-sourcing with external assurance providers)
–Review and evaluate risk management activity and provide assurance over the effectiveness of the
control environment
–Report to the Board and the Group Executive
Governance and oversight
The Board is accountable for the Group’s system of risk management and internal control, including the
amount of risk the Group is prepared to accept in delivering our strategic priorities (our risk appetite).
The Group Principal Risks are monitored throughout the year. Each Group Principal Risk is also subject to
a detailed review annually by the Group Ethics, Risk and Compliance Committee and the relevant Board
committees. A consolidated summary of the Group Principal Risks and how they are being managed is
then reviewed bi-annually by the Audit & Risk Committee. Reporting includes consideration of changes in
the internal and external context, a review of the effectiveness of mitigations and internal controls, and an
assessment of whether risks are being managed within risk appetite, together with any additional
actions required.
National Grid plc Annual Report and Accounts 2025/26
31
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Our Group Principal Risks
Business context
The external context in which we operate has changed significantly in recent years, particularly in relation to the political
and regulatory environment, technological developments, affordability considerations, and how we deliver for customers.
We adapt our business and risk management activities and mitigations accordingly.
Group Principal Risks
Operational risks arise from our core
business practices, which rely on our
systems, equipment, processes and people.
–Catastrophic security incident
–Significant safety or environmental event
–Loss of supply*
–Major capital projects
Strategic risks, both internal and external,
are associated with the business model,
corporate strategy and long-term planning.
–Satisfactory regulatory outcomes
–Climate change mitigation
–Political and societal expectations
–People capability and capacity
Financial risks are risks associated with
National Grid’s ability to raise capital,
maintain access to capital, and deliver
profitable growth.
–Financing our business
Compliance risks relate to compliance with
laws and regulations, industry standards,
contract requirements and internal policy.
–Legal and regulatory compliance
frameworks operate at a jurisdictional level
(i.e. UK, US federal, New York and
Massachusetts) and therefore apply
across all relevant National Grid
businesses rather than being
amalgamated at Group.
Strategic Group Principal Risks
Operational Group Principal Risks
Financial Group Principal Risks
Compliance Group Principal Risks
*Significant disruption of energy was renamed to Loss of supply during 2025/26 to better reflect the nature of the risk. Upstream supply considerations are included as a key cause.
A summary of actions taken by management to manage our Group Principal Risks is provided on pages 32 — 36. The Board reviewed these risks as part of the bi-annual
Group Principal Risk review, which incorporates feedback and recommendations from relevant Board Committees. Further information can be found on pages 100 — 104.
Strategic priorities
Risk trend
Strat-Link-No1_blue.gif
Strat-Link-No2_blue.gif
Strat-Link-No3_blue.gif
Strat-Link-No4_blue.gif
Strat-Link-No5_blue.gif
Risk-arrow-increasing.gif
Risk-arrow-decreasing.gif
Risk-no-change.gif
Enable the energy
transition
Build the networks
of the future now
Deliver for
customers
Operate safely and
efficiently
Build tomorrow’s
workforce today
Increasing
Decreasing
No change
National Grid plc Annual Report and Accounts 2025/26
32
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Our Group Principal Risks cont.
Operational Group Principal Risks
Catastrophic security incident
Strat-Link-No1_grey.gif
Strat-Link-No2_grey.gif
Strat-Link-No3_blue.gif
Strat-Link-No4_blue.gif
Strat-Link-No5_grey.gif
Oversight: Board and
Audit & Risk Committee
Risk-no-change.gif
Description
There is a risk that we are unable to adequately anticipate and
manage disruptive forces on our critical systems, facilities and
personnel, because of cyber attacks, physical attacks, malicious
internal or external actors, or inadequate recovery capabilities,
resulting in disruption of business operations, tampering or abuse of
assets, safety hazards, or loss of confidentiality, integrity, and/or
availability of systems and data.
Developments during 2025/26
The Board recognises that the risk of a catastrophic security
incident is being driven by an increasingly hostile and complex
threat environment, with potential for severe operational, financial,
and reputational consequences for critical national infrastructure
providers. Against these drivers, the Board’s focus is on whether
the Group has robust, layered defences and recovery capability to
prevent, detect and respond to catastrophic security events.
Actions taken by management
Management actions are focused on preparedness and rapid
recovery, recognising that the threat landscape is constantly
evolving. These actions include:
–Expansion of the risk to incorporate physical security incidents,
recognising the hybrid nature of threat, and reducing visibility
gaps to physical security controls and management.
–Employing technical, administrative, and physical/cyber security
controls for both IT and operational technology aligned to the
National Institute of Standards, and Technology Cybersecurity
Framework (NIST CSF) v2.0, as well as all applicable laws and
regulations.
–We consistently verify and validate our risk management through
internal and external audits and risk assessments, penetration
tests, adversary simulation, incident response exercises,
compromise assessments, continuous control measurements
and other assessment methods.
Significant safety or environmental event
Strat-Link-No1_grey.gif
Strat-Link-No2_grey.gif
Strat-Link-No3_grey.gif
Strat-Link-No4_blue.gif
Strat-Link-No5_grey.gif
Oversight: Safety &
Operations Committee
Risk-no-change.gif
Description
There is a risk of a significant safety or environmental event because
of network asset failures or operability issues, extreme weather,
third-party damage or security attacks, resulting in a major public or
employee safety impact, or environmental damage.
Developments during 2025/26
The Board recognises that the risk of a significant safety or
environmental event is influenced by a combination of asset-related
factors, operating environment pressures, and heightened
stakeholder expectations. The Board’s focus is on whether the
Group has robust, consistently applied controls and culture to
prevent serious safety or environmental incidents, and to respond
effectively if they occur. National Grid takes a holistic approach
focusing on proactive preventative measures including inspection
and maintenance of assets as well as appropriate recovery and
response procedures.
Actions taken by management
Management actions are focused on prevention, preparedness,
and continuous improvement, recognising that the consequences
of a significant safety or environmental event could be severe,
including:
–Reduction in risk exposure following the sale of Grain LNG.
–Updates to Group-wide Process Safety Business Management
System to further strengthen prevention of process safety events
through tighter control of safety-critical maintenance.
–Delivering proactive inspection, maintenance and integrity
management programmes to reduce the likelihood of asset
failures that could lead to safety or environmental harm.
–Maintaining and testing emergency response arrangements to
ensure rapid, coordinated action to protect people, communities,
and the environment if an incident occurs.
–Using incident investigations, near miss reporting, assurance
activity, and leadership engagement to embed learning and
reinforce a strong safety and environmental culture across the
organisation.
–Responding to new regulatory requirements in the US which
provide opportunities to strengthen process safety management.
–Although primarily related to the Loss of supply Group Principal
Risk, the proposed New York Northeast Supply Enhancement
(NESE) pipeline project would not only mitigate some gas supply
constraints, it could also reduce the potential risks relating to
major hazard assets that are caused by extensive manual
relighting efforts when service disruptions occur, and will reduce
the number of Compressed Natural Gas (CNG) sites required in
Downstate New York.
National Grid plc Annual Report and Accounts 2025/26
33
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Our Group Principal Risks cont.
Operational Group Principal Risks
Loss of supply
Strat-Link-No1_grey.gif
No2_grey.gif
No3_grey.gif
Strat-Link-No4_blue.gif
Strat-Link-No5_grey.gif
Oversight: Safety &
Operations Committee
Risk-no-change.gif
Description
There is a risk of a loss of supply event because of network asset
failures or operability issues, upstream supply issues, extreme
weather, third-party damage or security attacks, resulting in
disruption of energy to our customers.
Developments during 2025/26
Increasing system complexities, system demand and network
stress, coupled with legacy assets, are of key focus to ensure the
Group continues to concentrate on proactive prevention and
efficient recovery from loss of supply events to reduce the risk of
significant disruption of energy to our customers. The UK
Government’s new Energy Resilience Strategy and associated
taskforce will provide enhanced sector‑wide coordination, and new
regulatory requirements in the US have created further opportunities
to strengthen asset management and resilience practices.
In response to the North Hyde substation fire in March 2025, we
have undertaken extensive, multi-stakeholder engagement to
understand the root causes, including comprehensive internal and
independent investigations and close collaboration with regulators,
government bodies and industry partners to ensure all lessons are
identified and issues addressed.
Actions taken by management
Management actions are focused on reducing the likelihood of
supply interruptions and minimising customer impact when events
occur, including:
–Acceptance of Ofgem’s RIIO-T3 final determinations which
recognise the need for significant investment in the electricity
transmission sector to continue to deliver world-leading reliability
while nearly doubling the amount of power we can transfer
around the country.
–Reduction in risk exposure following the sale of Grain LNG.
–Alleviated supply conditions are expected with the proposed
New York NESE pipeline project.
–Preparing our UK ED3 submission to Ofgem which will seek to
evidence the need for greater investment in climate resilience.
–Updating our risk assessments to incorporate upstream supply
failure scenarios.
–Continued collaboration with energy suppliers, regulators, and
government departments to explore industry wide mitigation
strategies aimed at maximising supply, managing demand and
enhancing storage.
–Gas main replacement programmes and a storm-hardening
programme, along with main outage planning to ensure swift
response and recovery.
–Reviewing and updating Group-wide assessments of climate
vulnerabilities and monitoring progress against multi-decade
climate adaptation plans, complemented by existing resilience
investments to ensure long-term preparedness.
–Further development of emergency response plans covering
wildfire and cyber scenarios, along with asset risk assessment
and integrity management plans.
–We continue to monitor wildfire risk and have engaged a third
party to carry out specialist wildfire risk assessments.
–Ongoing flood contingency plans and robust preparedness for
winter and summer, including scenario planning, and testing
response plans with proactive communication strategies.
–Acceleration of proactive maintenance and asset checks ahead
of winter to maximise network availability, with an emphasis on
system reliability assets, sub-sea cable monitoring and ongoing
year-round maintenance.
Major capital projects
Strat-Link-No1_grey.gif
Strat-Link-No2_blue.gif
Strat-Link-No3_grey.gif
Strat-Link-No4_grey.gif
Strat-Link-No5_grey.gif
Oversight: Safety &
Operations Committee
Risk-no-change.gif
Description
There is a risk that we are unable to deliver on our major capital
project programme within the required timeframes because of
misalignment or lack of clarity with regulatory expectations, unclear
financial frameworks to incentivise investment, complex planning
requirements, external impacts on supply chain, or a failure to
demonstrate clear, long-term economic benefits to communities,
leading to increased costs, compromised quality, reputational
damage and detrimentally impacting our ability to deliver our clean
energy transition strategy.
Developments during 2025/26
Delivery of the Group’s major capital projects remains a central
strategic priority, with the scale of our cumulative capital investment
reaching at least £70bn over the next five years to modernise
energy networks, support growing demand, and enable the energy
transition. The focus on execution is being shaped by numerous
external developments such as supply chain constraints, and
regulatory complexities which influence project cost, schedule,
planning, and stakeholder expectations.
Actions taken by management
Management actions are focused on strengthening delivery
discipline and resilience, including:
–implementing more consistent, Group-wide frameworks, to clarify
decision gates, strengthen and schedule controls and improve
transparency over delivery performance;
–enacting earlier engagement strategies with regulators, planning
authorities, and communities to reduce late stage changes or
delays; and
–strengthening procurement strategies, supplier relationships, and
commercial disciplines to mitigate supply chain risk. We are also
actively monitoring the current geopolitical landscape and
considering impact on our risks, including Catastrophic security
incident and Loss of supply in particular.
National Grid plc Annual Report and Accounts 2025/26
34
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Our Group Principal Risks cont.
Strategic Group Principal Risks
Strategic priorities
Strat-Link-No1_blue.gif
Strat-Link-No2_blue.gif
Strat-Link-No3_blue.gif
Enable the energy
transition
Build the networks
of the future now
Deliver for
customers
Strat-Link-No4_blue.gif
Strat-Link-No5_blue.gif
Operate safely and
efficiently
Build tomorrow’s
workforce today
Risk trend
Risk-arrow-increasing.gif
Risk-arrow-decreasing.gif
Risk-no-change.gif
Increasing
Decreasing
No change
Satisfactory regulatory outcomes
Strat-Link-No1_grey.gif
Strat-Link-No2_grey.gif
Strat-Link-No3_blue.gif
No4_blue.gif
Strat-Link-No5_grey.gif
Oversight: Responsible
Business Committee
Risk-no-change.gif
Description
There is a risk that we fail to influence future energy policies and
secure satisfactory regulatory agreements because of lack of insight
or unsuccessful negotiations given the scale of investment needed
to meet load growth and clean energy requirements, while
balancing affordability and reliable concerns. This will lead to poor
regulatory outcomes, energy policies that negatively impact our
operations, reduced financial performance, fines/penalties,
increased costs to remain compliant and/or reputational damage.
Developments during 2025/26
The scale of change required to enable the energy transition is
unprecedented, driving our focus on whether the Group has the
insight, engagement, and capability to secure satisfactory regulatory
outcomes. Specifically ensuring the Group is proactively shaping
price controls and rate case filings with clear positions and
engagement/advocacy to support economic growth, affordability,
reliability and a cleaner energy system. Affordability remains a
prominent theme, influencing public sentiment and regulatory
scrutiny. Customers are seeking to understand what steps utilities
are taking to manage costs that end up on customer bills. The
impact on customers has always been a concern in utility
infrastructure planning and the costs on the bill beyond delivery
service are growing, leaving less room for necessary grid
investment.
Actions taken by management
Management actions are focused on proactive engagement, robust
regulatory frameworks and disciplined delivery, specifically including
the following:
–Ensuring well-evidenced submissions that clearly articulate
investment need, customer impact, and long-term value, with a
focus on achieving fair and sustainable outcomes.
–Demonstrating cost discipline, delivery efficiency, and value for
customers, including consideration of incentives, reopeners, and
performance mechanisms within regulatory frameworks.
–Continuously monitoring regulatory developments, decisions and
emerging risks across jurisdictions to inform strategy with
escalation where necessary.
–We have accepted the RIIO-T3 price control, achieving a
satisfactory outcome. We are now focused on delivering against
our commitments with continued focus on capital delivery
efficiency and responding to the highly incentivising framework
that aligns outperformance with outcomes customers value (for
example, faster connections and reduced constraint costs).
–We are actively engaging on the ED3 price control (price control
2028-33), focusing on well-evidenced submissions that balance
investment requirements with delivering value for customers and
affordability.
–We are focusing on core regulatory principles in ongoing gas
base rate cases and engaging constructively with regulators to
support balanced and sustainable outcomes, having successfully
agreed our 2025/26 US rate cases.
–We are participating in affordability and rate design dockets in the
US to educate on the regulatory compact.
–Our interconnector structures continue to deliver net benefits to
customers, including supporting system efficiency and enabling
funding for energy assistance programmes.
National Grid plc Annual Report and Accounts 2025/26
35
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Our Group Principal Risks cont.
–
Strategic Group Principal Risks
Climate change mitigation
Strat-Link-No1_blue.gif
Strat-Link-No2_grey.gif
Strat-Link-No3_grey.gif
Strat-Link-No4_grey.gif
Strat-Link-No5_grey.gif
Oversight: Responsible
Business Committee
Risk-no-change.gif
Description
There is a risk that we fail to identify and/or deliver upon the
actions necessary to meet our climate change targets and enable
the wider energy transition because of poor monitoring and
response to external developments associated with mitigating
climate change, leading to legal risks or reputational impacts of
not meeting our climate change targets and, in the longer term,
reaching net zero by 2050.
Developments during 2025/26
Achieving climate change targets remains a central long-term
objective. The strategic focus on delivery is increasingly shaped by
external developments that influence the pace, cost, and feasibility
of the energy transition. These developments continue to evolve
across policy, markets, technology and stakeholder expectations,
and are actively monitored as part of the Group’s risk and strategic
planning processes. Against these drivers, the Board’s focus is on
whether the Group has appropriate governance, controls and
flexibility to manage climate change targets within appetite.
Actions taken by management
Management actions are focused on credible target management,
governance and transparency, recognising the importance of
adapting to a changing external environment. These actions include:
–implementing a revised US operating model with sustainability
teams embedded within business units, and integrating
Environment, Social, Governance and Risk teams to strengthen
oversight and coordination;
–undertaking an internal review of the Group’s climate targets and
maintaining current targets while keeping alternative pathways
under active consideration, reflecting evolving external
dependencies;
–updating greenhouse gas emissions analysis to reflect changes
in policy, regulation and market conditions, and using peer
benchmarking to inform ongoing risk assessment; and
–improving our sustainability narrative to better reflect our wider
societal contribution to emissions reduction.
Political and societal expectations
Strat-Link-No1_blue.gif
Strat-Link-No2_grey.gif
Strat-Link-No3_blue.gif
Strat-Link-No4_grey.gif
Strat-Link-No5_grey.gif
Oversight: Responsible
Business Committee
Risk-no-change.gif
Description
There is a risk that we do not position ourselves appropriately to
navigate political and societal expectations because of a failure to
proactively monitor the landscape or anticipate and respond to
changes, leading to political intervention, an inability to meet our
core energy objectives, uncovered costs or pressure on returns or
the inability to gain necessary regulatory approvals.
Developments during 2025/26
The Board recognises that the risk associated with political and
societal expectations arises from a rapidly evolving external
environment, where energy affordability, climate policy and public
trust are increasingly intertwined with political decision making.
Against these drivers, the Board’s focus is on whether the Group is
appropriately positioned to navigate political and societal
expectations, while continuing to deliver its strategic priorities.
Actions taken by management
Management actions are focused on anticipation, engagement and
alignment with policymakers, recognising that many external drivers
are outside the Group’s direct control:
–Implementing a more regionally focused external affairs operating
model to improve engagement with governments, regulators,
communities and other stakeholders in key markets.
–Monitoring political, regulatory, media and societal trends across
jurisdictions to identify emerging issues early and inform decision
making.
–Defining policy priorities aligned to the Group’s strategic
objectives and engaging constructively with policymakers to
support stable, investable regulatory frameworks.
–Conducting scenario analyses to ensure the Group can adapt its
response to changes in the external environment.
People capability and capacity
Strat-Link-No1_grey.gif
Strat-Link-No2_grey.gif
Strat-Link-No3_grey.gif
Strat-Link-No4_grey.gif
Strat-Link-No5_blue.gif
Oversight: People &
Remuneration Committee
Risk-no-change.gif
Description
There is a risk that we do not have, across our workforce and within
our leadership, the capability or capacity necessary to deliver on
existing or future commitments because of ineffective planning for
future people needs, insufficient development of people, and failure
to attract and retain people in a competitive market for skills and
talent, leading to failure to deliver on our business goals, strategic
priorities and mission.
Developments during 2025/26
We continue to focus on future workforce needs, recognising that
the ability to deliver the Group’s strategic priorities, including the
energy transition and major capital projects, is fundamentally
dependent on having sufficient workforce capacity, capability and
leadership depth, now and in the future.
Actions taken by management
Management actions are focused on building resilience, flexibility,
and future ready capability, while balancing near-term delivery
needs with longer-term workforce sustainability. These actions
include:
–maintaining a consistent, forward looking, Group-wide approach
to strategic workforce planning to have visibility on future
capacity and capability requirements;
–expanding our early careers programmes to build sustainable
talent pipelines for critical roles and support diversity of talent
pools; and
–monitoring recruitment and retention metrics closely to ensure
capacity is stable and delivery risk is reduced.
National Grid plc Annual Report and Accounts 2025/26
36
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Our Group Principal Risks cont.
Financial Group Principal Risks
Strategic priorities
Strat-Link-No1_blue.gif
Strat-Link-No2_blue.gif
Strat-Link-No3_blue.gif
Enable the energy
transition
Build the networks
of the future now
Deliver for
customers
Strat-Link-No4_blue.gif
Strat-Link-No5_blue.gif
Operate safely and
efficiently
Build tomorrow’s
workforce today
Risk trend
Risk-arrow-increasing.gif
Risk-arrow-decreasing.gif
Risk-no-change.gif
Increasing
Decreasing
No change
Financing our business
Strat-Link-No1_blue.gif
Strat-Link-No2_grey.gif
Strat-Link-No3_grey.gif
Strat-Link-No4_grey.gif
Strat-Link-No5_grey.gif
Oversight: Audit & Risk
Committee
Risk-no-change.gif
Description
There is a risk that we are unable to fund our business efficiently as
a result of lack of access to a wide pool of equity and debt
investors, market volatility, unsatisfactory regulatory outcomes or
unsatisfactory financial or operational performance of the business,
leading to a lack of access to capital, impacting our ability to
achieve our strategic objectives, including our proposed capital
investment programme.
Developments during 2025/26
The Board recognises that the ability to finance the Group’s
strategy is increasingly influenced by a combination of
macroeconomic conditions, capital market dynamics, and
regulatory outcomes, alongside the scale and duration of the
investment programme. The Group is undertaking a multi-year
investment programme of unprecedented scale to modernise
networks, meet rising demand and enable the energy transition.
The duration and magnitude of this investment mean that continued
access to debt and equity markets on acceptable terms is
essential. The Board considers the long-term nature of these
funding needs to be a key structural driver of financing risk.
Actions taken by management
Management actions are focused on maintaining financial resilience,
flexibility and market access, recognising that many financing
drivers are external and cyclical. Key actions and developments
include:
–We have agreed an updated five-year financial framework to
2030/31, including cumulative capital investment of at least
£70bn over the next five years.
–Delivered positive regulatory outcomes, including approval of
NIMO Niagara Mohawk (National Grid’s electric and gas
distribution business in Upstate New York) rate agreement joint
proposal and acceptance of the RIIO-T3 final determinations.
–Ensured maintenance of appropriate headroom against key
credit metrics, supporting confidence in the Group’s ability to
access debt capital markets.
–Maintained strong engagement with current and potential
investors through both the Group’s equity and debt investor
relations programmes.
–Maintaining strong liquidity, a robust credit rating and access to a
diversified range of funding sources to raise debt efficiency to
fund our investment programme.
–Completion of portfolio actions, including the disposals of
National Grid Renewables and Grain LNG in 2025/26, with
proceeds retained for reinvestment in the regulated business.
–Frequent engagement with credit rating agencies, with no
changes to credit ratings or outlooks expected.
National Grid plc Annual Report and Accounts 2025/26
37
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Cyber security and emerging risks
Cyber security risk management and strategy
Cyber security risk is overseen and continuously monitored by the
Group Executive and the Board. We apply the NIST cyber security
framework to identify, assess, monitor and respond to cyber security
risks, supported by a risk management process aligned to the
Group’s ERM Framework and covering all IT and operational
technology assets including systems and data, legacy technology risk
and those operated by third parties. Our cyber security risks are
managed via the “Three Lines” model, supplemented by external
specialist support including cyber security firms, providing
independent validation of our approach and specialist expertise for
specific regulatory requirements and technologies. Further assurance
is obtained through risk assessments, penetration testing, adversary
simulation, incident response exercises and compromise
assessments. An independent Supply Chain Risk Management
(SCRM) function identifies and oversees cyber risks arising from
third‑party service providers, with controls implemented by SCRM
that are proportionate to the supplier’s access to Group systems and
the sensitivity of data processed.
There have been no cyber security incidents to date that have
materially impacted the Group’s business strategy, results of
operations or financial condition. Notwithstanding this, we recognise
that the cyber threat environment for critical infrastructure providers
remains highly challenging and dynamic. We recognise that digital
transformation blurs the boundary between physical and cyber
security. Modern hybrid threats can combine common cyber attacks
with physical dimensions such as intrusion or sabotage. We have
emphasised a converged model that strengthens our ability to detect,
prevent and respond to these complex, multi-vector threats,
providing a more robust and resilient security framework.
Cyber security governance
The Board is responsible for oversight of cyber security. The Audit &
Risk Committee regularly reviews reporting on our approach to cyber
security risk management and developments throughout the year.
National Grid’s Chief Information and Digital Officer (CIDO) and Chief
Information Security Officer (CISO) regularly attend the Audit & Risk
Committee and hold additional briefings to the Board at least once
per year. The Audit & Risk Committee and Board work collaboratively
to ensure oversight with the proper focus of each respective
Board committee.
Cyber risk reporting includes, among other things, current and
emerging cyber security threats to National Grid and relevant sectors,
the status of key risk indicators and controls, the results of any
relevant internal or external assessments, key incidents escalated to
management during the prior and current reporting period and the
status of cyber security improvement programmes. At the executive
and management level, the CIDO is the owner of the cyber security
risk and the CISO has primary responsibility for the development,
operation and maintenance of National Grid’s cyber security
programme. Under the CISO’s oversight, National Grid’s cyber
security team implements and provides governance and functional
oversight for cyber security services, controls and processes.
In line with our ERM Framework, cyber security processes include the
escalation of material risks and incidents, including those that
originate or occur from third parties, through the organisation to the
Group Executive Committee, Audit & Risk Committee and Board as
appropriate, based on an assessment of likelihood and severity
of impact.
Emerging risks
We consider emerging risks and trends
throughout the year to assess potential future
material impacts on our risk profile. Each risk is
assigned an appropriate owner or subject matter
expert, who monitors developments and is
responsible for implementing relevant mitigations
as necessary. Emerging risk reviews are reported
at least bi-annually to the Group Ethics, Risk &
Compliance Committee, the Audit & Risk
Committee, and the Board, for review and input.
Our top three emerging risks at the date of this report are:
Emerging risk
Impact on strategy
Velocity
Immediate < 3 years
Short term 3–5 years*
Medium term 5–10 years
Geopolitical tensions
(business or supply chain disruption)
Strat-Link-No1_grey.gif
Strat-Link-No2_blue.gif
Strat-Link-No3_grey.gif
Strat-Link-No4_blue.gif
Strat-Link-No5_grey.gif
Artificial intelligence
(strategic opportunities or disruption)
Strat-Link-No1_blue.gif
Strat-Link-No2_blue.gif
Strat-Link-No3_blue.gif
Strat-Link-No4_blue.gif
Strat-Link-No5_grey.gif
Affordability
(customer affordability issues)
Strat-Link-No1_blue.gif
Strat-Link-No2_grey.gif
Strat-Link-No3_blue.gif
Strat-Link-No4_grey.gif
Strat-Link-No5_grey.gif
* We continuously monitor our short-term emerging risks to ensure we respond to changes in our risk assessments appropriately.
Resp_Business_Intro BG v5.jpg
National Grid plc Annual Report and Accounts 2025/26
38
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Responsible Business review
Delivering our Responsible
Business Charter
Our Responsible Business Pillars and UN Sustainable Development Goals where we have the most material impact:
We aim to act as a responsible business and play our part in
delivering an affordable, secure and clean energy system. Our
Responsible Business Charter (RBC) details our approach to being
a responsible business and the commitments we have made. It
focuses on three core pillars: Our environment, Our customers and
communities, and Our people, supported by our Responsible
Business Fundamentals.
Further details on our Responsible Business activities and metrics
can be found on our website. See links below.
Our
environment
Our customers
and communities
Our people
By building out the network of the future, we are
continuing to connect low-carbon generation and
storage and use our networks to support the
electrification of heat and transport. We are also
working hard to manage the impact of energy
infrastructure on the natural environment.
As we help to build out the network of the future, we
aim to create social value for our customers and
communities. We work to support economic growth in
the communities we serve, support affordability as a key
part of the energy transition, and engage in volunteering
and community skills development.
We are focused on providing development
opportunities to all our colleagues, creating an
inclusive culture, and enhancing the health and
wellbeing of our employees.
2025/26 progress
Looking forward
2025/26 progress
Looking forward
2025/26 progress
Looking forward
–Replaced 315 miles of leak
prone pipe
–Reduced SF6 emissions by
43% through leak repairs and
investing in alternatives
–Continuing to connect low-
carbon generation to our
networks
–Collaborating with suppliers
to reduce their own
emissions
–Assisted over 20,000
households through our
UK Grid for Good Energy
Affordability Fund
–Exceeded our Skills
Development
–Continuing to listen to and
address customer feedback
–Expanding new and existing
community partnerships
–81% Group-wide
employee engagement
score
–A Glassdoor 2026 Best
Place to Work
–Expanding recruitment and
development programmes
–Continuing to promote healthy
practices and wellbeing
resources
Read more on page 40
Read more on page 45
Read more on page 47
Read-more-arrow-clear.gif
Read-more-arrow-clear.gif
Read-more-arrow-clear.gif
Our Responsible Business Fundamentals
At National Grid, it is a priority to run our business and
engage with our supply chains in a responsible way.
Our Fundamentals include governance and activities
that are essential to day-to-day business.
2025/26 progress
–Transitioned supply chain sustainability
risk assessments and data to EcoVadis
to support supplier assessments
–Invested in new innovations, such as AI
demand response in data centres and
enhanced pipeline imaging
Looking forward
–Continuing to improve our safety
programme with insights from our new
reporting system
–Increasing our workforce AI and data
capabilities
–Further embedding sustainability into
supplier sourcing
To view our
Responsible
Business data
tables, scan or
click the QR
code
To explore our
Responsible
Business
website, scan
or click the QR
code
To read more
about our
Responsible
Business
Charter, scan
or click the QR
code
RB Data tables pp38.jpg
RB Website pp38.jpg
RB Charter pp38.jpg
Read-more-arrow.gif
Read more on page 49
All 2025/26 Responsible Business metrics can be found in the Responsible Business data tables on our website.
National Grid plc Annual Report and Accounts 2025/26
39
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Responsible Business review cont.
Our progress in 2025/26
Responsible business is important to us and our
stakeholders. Over the past year, we have
navigated a complex landscape characterised by
significant economic and political uncertainty. In
this environment, energy security and affordability
remain priorities. Part of being a responsible
business is taking account of, and responding to,
these expectations to deliver for our customers,
communities, colleagues and other stakeholders.
While clean power retains support from the UK
Government, energy costs remain a significant
challenge and energy resilience has emerged as a
key issue. In the US, both New York and
Massachusetts have acknowledged affordability
concerns related to the energy transition.
We, alongside other network companies, have a
unique role to play in supporting the energy system
transition. While we remain focused on reducing
our own carbon emissions, by building out the
network of the future, we are supporting
the deployment of renewable energy supply to meet
society’s growing electricity needs and bringing
down overall emissions. We are also innovating
through new technologies and approaches to
maximise the pace and scale of system-wide
decarbonisation. We are therefore looking beyond
our own emissions at the emissions reductions we
influence through our delivered and future
business activities.
In 2025/26, we connected 1,125 MW of energised
renewable generation to our transmission and
distribution networks and saw further uptake of
heat pumps and electric vehicles across our
jurisdictions. We expect these new assets to
deliver emissions savings year-on-year and
estimate they will help avoid 5 MtCO2e from
2026/27 to 2030/31 as renewable electricity
generation replaces carbon intensive generation,
heat pumps replace gas and oil boilers, and EVs
replace internal combustion engines1.
Looking forward, a significant uptick in National
Grid activity, underpinned by at least £70 billion of
capital investment in the next five years, will deliver
infrastructure that is expected to support reliable,
cleaner and affordable energy. We expect to
support further avoided emissions through our
continued role in connecting renewable generation
and facilitating the uptake of heat pumps and
electric vehicles in our jurisdictions.
We also have a wider enabling role in the energy
transition. Our infrastructure helps deliver clean
power generated by assets connected to other
networks, to both existing and new sources of
demand served by our network or in other
locations. For example, in the UK we are delivering
transmission projects to increase power flows
between Scotland and England and developing
new links to mainland Europe, better connecting
clean power to demand. In the residential,
commercial and industrial sectors, electrification
can be a key driver of emissions reductions,
including through fuel switching to electricity
supplied through our networks for heating and
transport. In collaboration with others, we therefore
expect our infrastructure to enable significant
emissions reductions across a range of sectors.
A range of activities will contribute, including:
–our Great Grid Upgrade, the largest overhaul of
the UK electricity grid in generations;
–the Upstate Upgrade, a collection of complex,
multi-year high-value transmission line projects in
support of New York’s Climate Leadership and
Community Protection Act; and
–innovation through regulatory funded projects,
working with our supply chain partners and
through our venture capital arm National Grid
Partners.
Our Scope 1 and 2 emissions are down 3% vs our
2018/19 baseline. This is outside of the range set
out in our second Climate Transition Plan (CTP),
published in May 2024. We stated in our CTP that
progress is unlikely to be linear. Scope 2 emissions
were lower than last year, but Scope 1 emissions
were higher than expected due to increased
generation from our Long Island facilities that burn
oil and gas. These units are crucial to reliability and
are contracted to the Long Island Power Authority
(LIPA), which controls when and how much they
run to maintain reliable energy supply in the region.
Our Scope 3 emissions increased by 11% in
2025/26, primarily due to an increase in supply
chain emissions, as anticipated in our CTP, as we
build out new infrastructure. We continue to identify
opportunities to reduce supply chain emissions
and aim to decouple spend growth from
emissions growth.
Affordability continues to be a concern for
households and businesses. In the US, we’ve
continued to raise awareness of financial
assistance and support available and, in the UK,
we’ve seen reforms to the connection queue that
will help us to prioritise connection-ready low-
carbon generation projects to expand availability
and maximise capacity.
We also support our local communities through
volunteering and skills development programmes.
We maintain partnerships with charities, non profits
and educators to create skills and employability
pathways for everyone in our communities and to
provide opportunities for colleagues to volunteer.
We are committed to creating a work environment
where people are treated fairly and where everyone
feels respected, valued, and empowered to reach
their full potential. For our colleagues, safety
remains our top priority as project work is scaled
up to meet our commitments, and we have a range
of initiatives underway in our business units to
ensure we meet our safety targets.
The following sections highlight the progress made
in the last year against our RBC and where there is
more to do. Working with our stakeholders, we will
continue to make progress on all of our
commitments.
1.Avoided emissions represent the difference between baseline
(counterfactual) emissions and emissions after the
implementation of the low-carbon alternative. We have estimated
cumulative avoided emissions to 2030/2031 from low-carbon
solutions delivered in 2025/26, specifically 1) Renewable
electricity connections (direct connections to our transmission
and distribution networks) 2) Electric heat pumps replacing fossil-
fuel boilers (in our distribution/customer regions) and 3) Electric
vehicles replacing internal combustion engine vehicles (in our
distribution/customer regions). Renewable electricity connections
are sourced from our Responsible Business data tables. Heat
pump and electric vehicle data is sourced at the NY, MA and UK
level on a calendar year basis, and National Grid’s share is
estimated by using NGED’s share of electricity distribution
network customers in the UK and our delivered electricity load in
our US jurisdictions. Grid carbon intensity and marginal plant
intensity are calculated on a calendar year basis.
National Grid plc Annual Report and Accounts 2025/26
40
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Responsible Business review cont.
Our environment
ResponsibleBus-Environment.jpg
We have always viewed our targets as ambitious.
Achieving them relies on a combination of actions
we take ourselves, as well as technological
dependencies, policy and regulatory frameworks in
the regions we operate, and actions by others
including businesses and energy consumers. Our
ability to achieve our climate targets is driven by
the policies put in place by the jurisdictions where
we operate that support decarbonising their energy
systems at a rapid pace. Political and economic
headwinds have intensified in the past year.
Governments face multiple pressures, including
budget constraints and customer affordability
concerns, which may impact the pace of
Our environment
By building out the network of the future, we enable the
deployment of low-carbon energy supply and support the
electrification of heat and transport. We are also working
hard to manage the impact of energy infrastructure on the
natural environment.
Our second Climate Transition Plan (CTP), published in May 2024, outlines our
roadmap to achieve net zero by 2050. As part of this, we have set near-term science-
based GHG emissions reduction targets at a Group level. These have been approved
by the Science-Based Targets initiative (SBTi) as aligned with limiting global warming
to a 1.5°C pathway and the ambition of the Paris Agreement, and have been developed
using an SBTi sectoral decarbonisation approach where available. SBTi is currently
developing the Corporate Net Zero Standard Version 2, and we have been actively
engaged in their consultation to shape the new standard.
Actions by our stakeholders are crucial to us being able to deliver our emissions
reductions targets. We engage with policymakers and regulators aiming to achieve
the required planning and permitting changes in the UK and US, and in the US where
we are an energy supplier, policies that promote energy efficiency and the use of low-
carbon fuels. We also work with customers to promote efficient solutions, industry
groups to advance new technologies, and our suppliers to help decarbonise the
value chain.
decarbonisation. While the costs of some
technologies continue to fall, the costs of other
renewable technologies have risen, which is also
impacting policy and the pace of the transition.
We’ve made good progress across multiple areas
of our emissions inventory, including where we
have direct control. Where we don’t have direct
control, achieving our near-term targets looks
increasingly challenging as we are reliant on policy
and regulatory dependencies. Below, we provide
an update on progress against some of our
targets, including some of the most material
dependencies that could impact our progress.
Moving forward, we will continue to prioritise
reductions where we have operational control and
influence areas where we do not, refining our
approach based on our results. More detail on our
targets, key dependencies and challenges can be
found in our CTP, available on our website.
We committed to
Achieve net zero by 2050     
for Scope 1, 2 and 3 GHG
emissions
We continue to work towards our ambitious
targets. However, we are reliant on external
dependencies such as policy and regulatory
support and wider sectoral decarbonisation.
Scope 1 and 2 GHG emissions for
2025/26 were 7,511 ktCO2e, outside of
our range set out in the CTP, and down
3% from our 2018/19 baseline.
Progress to target1,2 %
Target 2030/31
3%
60%
66
Scope 1 GHG emissions in areas where we have
greater direct control have fallen from the baseline
year. Gas operational emissions from fugitives and
venting comprise about 10% of our Scope 1 and 2
emissions and have decreased 4.2% from the prior
year. These emissions are largely driven by the
volume of gas travelling through our pipes and are
being addressed through investments in cross
compression, pipeline coatings, vacuum purging,
and rehabilitation of leak-prone piping.
In 2025, we replaced 315 miles of leak-prone pipe
in New York and Massachusetts. This long-
standing programme delivers emissions reductions
each year. This programme is progressing within
the projected ranges of our CTP. We are also
evaluating advanced leak detection technologies,
including stationary, satellite, aerial and ground
based solutions to quickly identify and mitigate
emissions sources.
Scope 1 GHG emissions where we have less direct
control are outside of the range that we set out in
our CTP. The most challenging area is emissions
from our Long Island generation facilities, where
emissions increased by 19% from the previous
year. These units burn oil and gas and are
contracted to the Long Island Power Authority
(LIPA), which controls when and how much they
run to maintain reliable energy supply in the region. 
1.Includes Scope 2 location-based emissions only.
2.Near-term targets approved by Science-Based Targets initiative
(SBTi) and aligned to the Paris Agreement and a 1.5ºC pathway.
National Grid plc Annual Report and Accounts 2025/26
41
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Responsible Business review cont.
Our environment
Our 2025/26 GHG emissions footprint across direct and indirect sources was 37,015 ktCO2e
Our Long Island generation assets are currently
expected to be materially depreciated by 2040,
supply chain dia_pp41_NEW v2.jpg
Upstream Scope 3
Supply chain and other upstream emissions
7,012kt
18.9% of total footprint
–Construction and maintenance of energy infrastructure
–Equipment and components
–Well-to-tank emissions for generation
and transportation of electricity
Scope 1 and 2
Power generation
Operation
Administration
3,929kt
3,356kt
226kt
10.8% of total footprint
9.1% of total footprint
0.6% of total footprint
–Electricity generation from
fossil fuels
–Line losses from our electricity
transmission and distribution
networks
–SF6 leaks from electrical
equipment
–Leaks and venting from
our gas network
–LNG venting and fuel
–Building energy consumption
–Company cars
–Commercial fleet
Downstream Scope 3
Administration
Retail energy:
Sold Gas1
Retail energy:
Sold Electricity1
86kt
19,736kt
2,670kt
0.2% of total footprint
53.4% of total footprint
7.2% of total footprint
–Business travel
–Employee commuting
–Waste
–Emissions from the gas that we
sell to our customers
–Emissions from the electricity
that we sell to our customers
aligning with New York State’s zero-emissions
electricity targets. However, given delays to
offshore wind and anticipated load growth,
achieving a sufficient reduction in operating hours
in the timeframe required to hit our near-term
targets will be challenging, and fossil-fuel
generation assets may continue to operate beyond
2040 to support grid resilience.
Our Scope 2 emissions decreased by 15% during
2025/26. These are almost entirely comprised of
electricity network line losses and are broadly in
line with the trajectory set out in our CTP.
Electricity network line loss emissions are primarily
influenced by the location and carbon intensity of
generation and the location and magnitude of
demand, which are outside of our control. If our
jurisdictions see a slowdown in the pace of
decarbonisation, this will slow the pace of emissions
reductions from line losses. We indirectly reduce the
emissions from electricity line losses by connecting
low-carbon generation to our networks. We calculate
emissions from losses using the average carbon
intensity of electricity in the regions where we
operate, as published by the UK Government and
the US Environmental Protection Agency (EPA).
In the UK, there has been significant progress in
decarbonising the grid. The continued
implementation of various policy reforms, including
connections and planning, is required to support
ongoing progress. For US line loss emissions to
decrease in line with our wider targets, we would
need to see a wider societal increase in the pace of
clean energy development. This would require
addressing wider challenges around permitting,
interconnection, and customer affordability in
addition to current state government activities related
to renewable generation.
Regarding specific sub-targets for Scope 1 and 2,
from a 2018/19 baseline:
–The carbon intensity of our power generation
(Scope 1 GHG emissions) has increased by 3%
per MWh against a target of reducing by 90% by
1.Retail energy emissions are primarily driven by the gas and electricity we sell to our customers. Reducing these emissions depends on a
combination of actions we take, customer choices, wider energy system decarbonisation, and policy and regulatory frameworks.
2030/31 and 92% by 2033/34.
–We’ve reduced absolute Scope 1 and 2 GHG
emissions (excluding generation) by 26% against
a target of 50% by 2030/31.
We report on our power generation emissions
intensity as part of our SBTi targets. Since we
completed the sale of National Grid Renewables in
2025, our generation portfolio is made up solely of
gas and oil generation assets, which are operated
by LIPA. With this change, achieving this target is
very challenging, requiring fuel switching or carbon
capture technologies which are not yet
commercially viable.
20% of our light-duty vehicles are
electric vehicles.
Progress to target %
Target: 2030/31
20%
100%
78
We are making progress against our target to
move to a 100% electric fleet for our light-duty
vehicles, however, we continue to face challenges
with vehicle cost and availability. This year, we
have added 219 electric vehicles to our
commercial fleets, bringing our total to 1,235 EVs,
20% of our total number of light-duty vehicles.
Achieving this target is dependent on the cost,
availability, and performance of vehicles with the
required characteristics to meet operational needs,
which makes achievement of this target
increasingly challenging.
This year, we also introduced our first heavy duty
electric vehicle to our fleet, a box truck with a 230-
mile range based at our Sutton depot in
Massachusetts.
Moving forward, we will consider strategies to reduce
emissions from transport that are informed by vehicle
availability, use cases and conditions in the regions
where we operate, and cost effectiveness. We will
keep this target under review.
National Grid plc Annual Report and Accounts 2025/26
42
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Responsible Business review cont.
Our environment
Resp Bus_pp40_environ_NEW.jpg
SF6 emissions from our operations are
down 43%.
Progress to target1 %
Target: 2030/31
43%
50%
90
We continue to reduce SF6 emissions caused by
emerging leaks, resulting in GHG emissions
reductions of 43% against our 2018/19 baseline.
The majority (around 80%) of the SF6 we use on our
networks is in UK ET. Our focus is on SF6 leak
detection and repairs, as well as increasing our
investment in SF6 alternatives, working with other
UK transmission owners.
300
Absolute energy consumption in our
flagship offices is down by 48%,
exceeding our 20% target.
Target:
2030/31
Progress to
target %
20%
48%
102
We have reduced energy consumption in our flagship
offices by 48% against our 2019/20 baseline,
exceeding our 20% target, by optimising heating,
ventilation, air conditioning, and lighting to promote
efficiency while meeting the needs of our colleagues.
We also indirectly contribute to emissions
reductions through the purchase of renewable
certifications. In 2025/26 we achieved 62%
(2024/25: 36%) of renewable electricity purchased
with renewable certification globally, driven by the
UK, where 99.7% (2024/25: 49%) of electricity
purchased for operational purposes was with
renewable Energy Attribute Certification (EACs)
where we have choice over purchasing sources.
For leased and other sites where we do not have
purchasing decision choice, we do not have
control over whether the electricity purchased is
with renewable credentials. The increase
compared with the prior year mainly reflects the
disposal of Grain LNG; as the asset did not hold
EACs, its exit from the Group has led to a
significant increase in the UK percentage.
Our Scope 3 emissions (excluding sold
electricity) were up 11% from our
2018/19 baseline.
Progress to target1 %
Target: 2033/34
(11%)
37.5%
Our Scope 3 emissions (excluding sold
electricity) for 2025/26 were 26,833
ktCO2e.
The majority of our Scope 3 emissions result from
the use of sold gas we deliver to our customers in
the US, with these emissions making up about
75% of our Scope 3 emissions target.
Meeting our Scope 3 sold gas target would require
an additional estimated 1.2-1.8 million gas
customers converting to electric heat by 2033/34.
We continue to seek to enable the connection of
low-carbon electricity generation that is necessary to
support customers in switching to electric heat, and
we offer incentive programmes to encourage
customers to adopt heat pumps. However, to further
motivate heat pump adoption, we would need to
see reductions in the upfront cost of heat pumps, as
well as efficiency gains in heat pump technology.
Achieving the emissions reductions required to meet
our Scope 3 target is therefore challenging.
Emissions within our supply chain represent
approximately 18% of our Scope 3 emissions
target, and we have seen emissions increase by
2% during 2025/26. We projected this in our CTP
due to increased spend on goods and services
associated with the construction of new energy
infrastructure.
Regarding specific sub targets for Scope 3, from a
2018/19 baseline:
–The carbon intensity of power generation and
sold electricity (Scope 1 and Scope 3 GHG
emissions) decreased by 1% against a target of
reducing by 86% by 2033/341.
–We’ve reduced absolute GHG emissions from
gas sold by third parties by 10% against a target
of 37.5% by 2033/341,2.
62% of our UK supply chain emissions3
are from suppliers that have formally
committed to setting a science-based
target (SBT). 32% of our US supply chain
emissions3 are from suppliers that have
established a roadmap towards science-
based targets.
Progress to target1 %
Target: 2025/26
ResponcE-Bus-UK_Icons.gif
UK
62%
80%
ResponcE-Bus-US_Icons.gif
US
32%
50%
114
263
We continue to collaborate with key suppliers who
contribute significantly to the emissions associated
with the goods and services we procure. In the UK,
62% of our UK supplier GHG emissions are from
suppliers who are committed to setting an SBT. In
the US, 32% of our supplier GHG emissions are
from suppliers who have established a roadmap
toward SBTs. As our supply chain emissions data
and insights have matured, we have moved from
reporting a percentage of suppliers committed to
SBTs or an SBT roadmap, to the percentage of our
supply chain emissions covered by those suppliers.
Our suppliers have many dependencies that are
outside of their control, including the lack of SBT
pathways for certain sectors. SBTi is currently
consulting on the standards used to set validated
SBTs, with new standards expected to be formally
in place at the start of 2027. Because of this, we are
recommitting to our supply chain engagement,
retaining the target but extending the target date to
2030/31 and reporting a percentage of emissions
rather than a percentage of suppliers. We had
stated that this target was under review in our
2024/25 disclosure.
1.Near-term targets approved by SBTi and aligned to a well below
2°C pathway.
2.Third-party sold gas, a US only emission, are downstream
emissions associated with the combustion of natural gas
delivered through our network but sold by a company other than
National Grid. This differs from Scope 3 Cat. 11 GHG Protocol
guidance, which otherwise advises to consider only the end use
of goods sold by the reporting company itself.
3.Carbon Strategic Supplier Engagement: GHG emissions from
Scope 3 Cat 1 and Cat 2: Purchased Goods and Services and
Capital Goods only.
National Grid plc Annual Report and Accounts 2025/26
43
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Responsible Business review cont.
Our environment
We have developed a new responsible supply chain
We are committed to
strategy to work toward embedding sustainability
criteria into our strategic sourcing process. This
strategy focuses on the changes we need to make to
our contracting approach, tender strategy, and
engagement to drive change. More detail on this
strategy is available on our website.
Key construction materials such as concrete and
steel have significant carbon footprints and more
sustainable alternatives are difficult to source and
come at a higher cost. To see reductions in supply
chain emissions in line with our Scope 3 target, we
would need to see a significant reduction in the
carbon intensity of construction materials. In UK
ET, as part of our RIIO-T3 business plan, we’ve set
targets against some of our key carbon hotspot
areas, enabling us to influence how suppliers
respond and make changes to their operations.
Air travel emissions are down 45% from
our 2019/20 baseline.
Progress to target %
Target 2025/26
45%
50%
126
This year, absolute emissions from business air
travel are lower than the previous year at 6.1
163
ktCO2e, a 45% reduction from our baseline.
Air travel emissions are a very small portion (0.01%) of
our total Scope 3 emissions. While we have not hit our
target, we have made good progress in this area.
We’ve implemented hybrid working, consolidated
meetings to reduce the number of trips necessary and
embedded sustainability considerations into our travel
policy, discouraging travel where it is not necessary.
As a transatlantic business, we try to balance the
business benefits of in-person meetings with creating
efficiencies by reducing air travel. We remain focused
on reducing emissions in our most material areas and
reinforcing our travel policy to drive ongoing
progress, and we will not renew this target.
Protecting our natural
environment
In the UK we are committed to restoring the land
we manage. We use a natural capital approach to
measure the impact of improvements we make on
the non-operational land at our own sites based on
financial value estimations.
Due to significant differences in the conditions of
habitats and levels of biodiversity present in the
landscape between the UK and US, in the US our
efforts focus on the preservation of the natural
lands that we own. Acreage reported in the US
includes lands we have enrolled in our integrated
vegetation management (IVM) programme, which
aims to preserve biodiversity by optimising
trimming on our rights-of-ways, and other nature-
related projects.
On the land we manage in the UK, we have
Restoration.jpg
restored the natural environment by 15%.
Target
Progress to target %
10%
15%
A natural capital approach allows us to
demonstrate environmental restoration by
supporting and measuring beneficial changes to
land management and biodiversity. This is only
driven by activities in our UK ET business.
We manage around 1,800 hectares of non-
operational land in the UK, including hedgerows,
ancient woodland, wildflower meadows, wetlands,
grasslands and peat bog. We committed to
improving its environmental value by at least 10%
by 2026. Since 2020/21, we have achieved a 15%
increase. In our final year of the RIIO-T2
Environmental Incentive (2025/26), we delivered a
further uplift by introducing nine new strategic
partnerships and expanding one existing
agreement.
UK ED focuses on improving biodiversity on our
operational sites. We have committed to a six–year
formal partnership with Heart of England Forest to
support woodland management and restoration in
our West Midlands licence area. This past year, we
surveyed 18 sites to establish baseline habitat type
and quality, allowing us to develop habitat
maintenance plans to guide vegetation
management on these sites.
On the land we manage in the US, we
have enrolled 1,162 acres in our IVM
programme and other nature related
projects.
This year, we launched a collaborative BioAudit
biodiversity study with scientists and experts from
ACRT Services to help us assess the habitat quality
of our rights-of-ways. These corridors play an
important role in enhancing plant biodiversity and
ensuring that pollinators and wildlife have a place
to call home.
The data from the on-site assessments help us to
proactively plan and take measures to improve
habitat on these sites.
We also completed a nature-based solutions pilot
with Jacobs Engineering, Biomimicry 3.8, and EMX
Industries on a substation rebuild in Massachusetts.
The initiative aimed to solve common project
challenges using nature-inspired solutions. Eight
nature-based interventions were identified and
scoped into the substation rebuild design,
including moss walls, rain gardens and vegetated
filter strips.
Nature restoration at our Bell Rock
substation expansion project,
Fall River, MA
National Grid plc Annual Report and Accounts 2025/26
44
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Responsible Business review cont.
Our environment
We are
Investing in the decarbonisation
of the future of energy
We invested £9.8 billion in green
infrastructure and projects in 2025/261.
We play a key role in enabling and accelerating the
move to a cleaner energy future. Network
investment is vital for connecting new low-carbon
power generation and storage that will be needed
in the coming decade to accommodate the
expected rises in electricity demand and the
connection of renewable energy resources.
Our proportion of green capital expenditure
increased in 2025/26, aligning with EU Taxonomy
principles for climate change adaptation and
mitigation. In 2025/26, around 88.5% (£9.8 billion)
of our Group’s capital expenditure was aligned,
compared with 81% (£7.7 billion) in the previous
year. Green capital expenditure share of total
capital investment, which includes capital
prepayments and equity contributions, was 85%.
Our first six projects in Wave 1 of our Great Grid
Upgrade in the UK are now in construction, and in
the US, we continue to progress with permitting
requirements for our Upstate Upgrade projects in
New York. The essential upgrades that we’re
delivering in the US and UK will help to create a
modernised, stronger and cleaner energy network
and will generate new jobs.
These infrastructure investments also support
connections of renewable generation to the grid in
our territories. In 2025/26, we connected 1,125
MW of energised renewable capacity to our
networks across the UK and US.
1.Aligned to the principles of EU Taxonomy for sustainable
investment.
We are committed to
Using resources responsibly
We manage our environmental impact
with a focus on pollution, waste and
water use.
Various aspects of our work create waste,
including cleaning up former gas plant sites, retiring
old fossil fuel assets and leak-prone equipment,
and building grid infrastructure. We work to ensure
that our waste is correctly disposed of with
appropriate environmental permits and in
compliance with regulatory standards in the
applicable regions.
The different categories of waste are summarised
in our data tables, available on our website. Some
waste is classed as hazardous waste. This arises
from the removal of contaminated land during
commercial property activity and the disposal of oil
and polychlorinated biphenyl (PCB) or lead-
contaminated materials.
We recycle, refurbish and reuse materials at asset
refurbishment and investment recovery facilities in
the UK and US, promoting circularity within our
operations. We also work to reduce our waste
through initiatives such as the deployment of
reusable covers to replace plastic bags on units in
our plant centres in the UK. We’re also using
recycled materials in our operations, including the
use of copper with recycled content for
transformers in our Eastern Green Link 2 project.
More on our commitments around resource use
and waste management can be found in our
Environmental Operations Policy.
Our water use relates almost entirely to water used
for generation cooling purposes. Abstracted water
is not altered other than being slightly warmed by
the process. Water discharge temperatures are
closely monitored and follow applicable
regulations. This year, 1,234 million cubic metres
were withdrawn. Of this total, 99.6% relates to the
use of seawater for cooling generation assets in the
US and is returned to the sea in accordance with
permitted temperature limits.
We are
Adapting to a changing climate
We take action on our climate change
risks and opportunities and invest in
climate change adaptation activities.
Climate hazards are projected to increase in
frequency and severity in the future, with high
temperatures and coastal and river flooding of
particular concern in the areas where we operate.
Our approach to climate resilience, and addressing
risks arising from global warming impacts is
outlined in our TCFD report on pages 61-66. In
addition, our EU Taxonomy report details our
climate change adaptation expenditure.
RB Environment pp44.jpg
£9.8bn
2025/26 Green capital
expenditure
Aligned to EU Taxonomy principles for
climate change adaptation and
mitigation
1,125 MW
Energised renewable capacity
connected in 2025/26
National Grid plc Annual Report and Accounts 2025/26
45
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Responsible Business review cont.
Our customer and communities
ResponsibleBus_CustCom_Family.jpg
We acknowledge that there is a need for further
support to our customers. In both the UK and US,
support is needed for customers facing high
energy bills. In the UK, customers face long
connection wait times, negatively impacting
consumer sentiment. However, NESO has initiated
reforms to the connections queue that will help us
to deliver faster, more strategic grid connections
for our customers.
We are committed to
Supporting an affordable
energy transition
Our
customers and
communities
As we help to build out the network of the future, we aim
to create social value for our customers and communities.
We work to create economic growth in the communities
we serve and support affordability as a key part of the
energy transition.
We provide assistance to our customers and communities to help manage the
rising costs of energy and necessary infrastructure upgrades, working to
maintain positive relationships with our stakeholders.
Our skills development programmes provide people from disadvantaged
communities with access to training and employment opportunities, helping to
build our potential workforce of the future.
Our colleagues participate in volunteering events and projects to foster positive
relationships with our customers, communities and local regulators.
We have established the Grid for Good
We are committed to
Energy Affordability Fund to provide
assistance with energy bills.
National Grid remains committed to ongoing
support for those that cannot meet energy costs
and maintains the Grid for Good Energy
Affordability Fund to provide bill assistance. This
fund assists vulnerable households and businesses
struggling with energy costs via our charity
partners including the Fuel Bank Foundation, the
Centre for Sustainable Energy and the National
Energy Foundation.
We worked with key charity partners in the UK and
US to provide assistance with energy efficiency
upgrades, emergency financial support and
provision of energy advice to low-to-moderate-
income customers. In the last year in the UK, we
supported over 20,000 households through our
programmes.
The current Grid for Good Energy Affordability
Fund will run through 2026/27 to continue financial
support for organisations that assist vulnerable
households. Each year, the fund commits
£3.5 million of support in the UK and £3.3 million in
the US.
Online-arrow.gif
More information on how our funding is
supporting charities and organisations to provide
relief to vulnerable households can be found on
our website.
In the US, we offer a range of programmes to help
income-eligible families and customers manage
their energy bills. These include tiered discount
rates, bill discounts, energy efficiency programmes,
budget billing structures and payment extensions.
However, we acknowledge that there is more to be
done to support bill assistance to help our
customers manage rising costs.
Read-more-arrow.gif
More details on our contributions to UK bills and
average billing to US households can be found in
our Responsible Business data tables.
Read-more-arrow.gif
More information on our affordability initiatives in
ED, NY and NE can be found on pages 19 — 21
Accelerating social mobility
We support social mobility in the communities we
serve through partnerships with registered
charities, not-for-profit organisations, social
enterprises, educators, and our supply chain.
With these organisations, we have created skills
and employability pathways that help ensure
everyone has the opportunity to reach their
potential, regardless of background. Our work is
focused on improving awareness of the energy
industry and National Grid as an employer,
providing energy education programmes to
disadvantaged youth and work-ready adults, and
offering coaching for potential future talent.
We’ve exceeded our goal to upskill 45,000 people
in our communities and we remain dedicated to
actively supporting these programmes.
We ranked 8th out of the top 75 employers in the
2025 UK Social Mobility Index (SMI), rising 34
places from the previous year. This achievement
demonstrates our leadership in building an
inclusive, representative, and successful workplace
that supports upward social mobility.
National Grid plc Annual Report and Accounts 2025/26
46
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Responsible Business review cont.
Our customer and communities
We are
Engaging directly in our
communities through
volunteering
Across the UK and US we have delivered
52,620 volunteering hours in 2025/26 to
support our communities.
Progress to target (hours)
Target: 2030/31
500,000
100
Our volunteering programmes enable our
colleagues across the UK and US to connect with
their communities and have a tangible impact on
the causes that matter. We work with many partner
organisations to provide opportunities for
colleagues to volunteer their time in local
communities. Our volunteer efforts focus on
increasing access to affordable energy, increasing
access to STEM/STEAM education and building
community resilience. Colleagues this year have
logged 52,620 volunteering hours, bringing our
total to 292,611 volunteering hours since 2021.
Case studies on our volunteering engagement can
be found on our website.
We act
On the feedback we receive
from our customers on the
service we provide
Across the UK and US, we serve millions of
households and thousands of businesses. We are
committed to delivering secure and reliable energy
as affordably as possible, maximising the capacity
of our assets and ensuring our customers benefit
from an efficient and reliable network.
We recognise that there has been limited progress
across the business, especially in the US, on
customer satisfaction due to bill increases and
delays in connecting to our network. We are
listening to feedback and taking steps to address
these issues.
US customer satisfaction
This year, our US businesses refocused their CSAT
metric to better reflect overall customer experience.
The metric is measured through our monthly Brand
Image Relationship study and through post-
interaction customer surveys, and it is designed to
help us improve customer experience and
strengthen customer-centred thinking across our
business.
In 2025/26, New York saw a CSAT score of 72.8%
and New England saw a score of 72.2%.
Customers in both regions faced high fuel prices
and temperature extremes that increased bills,
which negatively affected customer perceptions.
We recognise that we need to do more to improve
customer satisfaction. We are committed to raising
awareness of financial assistance and other
services that help customers manage their energy
bills. In Massachusetts, we launched a new tiered
discount rate programme that expands eligibility
and assistance for our most vulnerable customers.
In New York, our NIMO rate plan, approved by the
Public Service Commission, includes
enhancements to affordability programmes.
We also held in-person customer assistance events
across our US jurisdictions. These events bring our
customer service specialists into community centres,
senior centres and other public gathering places, to
meet directly with customers. Here, our customers
can ask questions, discuss assistance programmes
and get help with our energy efficiency initiatives.
These events are critical to connect our customers to
the support programmes and tools they need.
We are in the process of implementing Kraken, a
groundbreaking, cost-effective platform that will
support end-to-end ownership of the customer
experience. We will be the first major regulated US
utility to adopt Kraken, which will improve the
customer experience by simplifying and
modernising how customers interact with us.
We continue to deploy Advanced Metering
Infrastructure (AMI) technology across New York
and Massachusetts, giving customers greater
visibility of their energy use. We have cumulatively
deployed over 500,000 smart meters in New
England and over 1.5 million in New York.
UK ED customer satisfaction
In UK ED, we have delivered a high level of
customer satisfaction for 2025/26 with a score of 9
out of 10.
We identify areas of best practice across our
licence areas to expand those solutions across the
business. We continue to undertake customer
service training, have customer engagement group
forums, and learn from the activities of other
distribution network operators to ensure we are
making the right decisions for our customers and
improve the customer experience.
UK ET customer satisfaction
In UK ET, Quality of Connections remains a pivotal
initiative, underpinning our commitment to
capturing valuable customer insights at every stage
of the connection lifecycle by measuring customer
satisfaction and gathering feedback. In UK ET, our
customer satisfaction score for 2025/26 was 7 out
of 10, demonstrating a positive shift compared to
last year, marked by significant industry reform and
rapid change.
NESO initiated reforms to the existing connections
queue that will aim to help UK ET deliver faster,
fairer and more strategic grid connections for
existing and future customers. For more on these
reforms, see page 18.
UK ET also drives broader societal economic
benefits to support customer satisfaction. For
example, we are currently upgrading our Didcot
substation in Oxfordshire to enable the connection
of data centres and battery storage systems to the
electricity transmission network. Located just two
miles from the UK’s first AI Growth Zone at
Culham, Didcot substation will boost grid capacity
for future digital projects. It will also connect 300
MW of battery schemes, helping to meet growing
demand for flexible, zero carbon power in the
region. Read more about the Didcot substation
project on our website.
NGV customer satisfaction
NGV conducts customer satisfaction surveys
across its business units and achieved good
scores overall in 2025/26.
Our UK subsea electricity interconnectors and US
NGV operations have scored the following:
IFA, IFA2 and Viking
92%
Prior year: 86%
BritNed
90%
Prior year: 87%
Nemo
91%
Prior year: 92%
The US Northeast
8 out of 10
Prior year: 8 out of 10
National Grid plc Annual Report and Accounts 2025/26
47
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Responsible Business review cont.
Our people
ResponsibleBus-People_Intro_NEW v2.jpg
We are
Investing in our people and
building the skills needed to
deliver the clean energy future
Our workforce is increasing and new skills will be
needed to deliver the grid of the future. Attracting,
developing and retaining a qualified and competent
workforce requires training programmes that are
robust, comprehensive, in line with local regulations
and focused on safety and competence.
In the UK, 132 graduates participated in our
Our people
Our 33,017 colleagues across the UK and US
are central to delivering the grid of the future.
To deliver on our commitments, we need to attract, develop and retain
the skilled workforce needed to respond to changes in our external
environment and within the business.
The physical and mental health of our colleagues is central to everything
we do. We continue to focus on ensuring fair pay for all our people and
providing them with development opportunities.
graduate scheme, which aims to enhance
graduates’ capabilities while emphasising
leadership development.
In the US, 98 graduates joined our refreshed
12-month development programme, which
includes a three-week orientation, blended virtual
and in-person skills training, three months of
coaching, and rotational placements for some
roles in months six to twelve.
In the US, we also continue to have a strong
Gridtern internship programme, welcoming
147 interns on summer internships in 2025.
Online-arrow.gif
Further details on our development programmes
can be found on our careers website.
Alongside early careers programmes, we provide a
wide range of development opportunities to our
colleagues through external learning providers,
including on-demand digital learning, behavioural
science-based development, team effectiveness
sessions and tailored virtual coaching for leaders
and senior colleagues.
We also run targeted leadership programmes to
identify and develop future senior leaders and to
support new and experienced managers in
becoming effective people leaders.
To achieve our commitments and deliver the grid
of the future, we need to attract, hire, and retain
people from a wide array of backgrounds, who
have different experiences and perspectives. We
take a clear stance against discrimination. Our
Global Recruitment and Hiring Policy ensures that
individuals identifying themselves as having a
disability receive fair consideration for all vacancies,
with reasonable accommodations and additional
resources provided whenever feasible. We are
dedicated to equal opportunities in recruitment,
training, promotion, and career development for all
our colleagues, including those with disabilities.
We aim to drive proactive sourcing, create a
best-in-industry candidate experience, and
maintain recruitment practices that help us build a
strong future workforce. We launched a new global
careers website to provide a single, modern
platform for candidates and a more tailored and
intuitive job searching tool.
In 2025/26, 41% of our vacancies were filled by
internal promotions and moves, demonstrating our
commitment to developing talent. We are also
increasing external hiring to secure the specialist
skills required for the future. Our workforce
81%
73%
77%
Employee
engagement
index in 2025/26
‘Safe to say’ in
Grid:Voice in 
2025/26
Employee
wellbeing
index in 2025/26
planning helps us anticipate capability needs and
shape targeted recruitment strategies, including
engaging with relevant talent pools ahead
of demand.
For more information, see our People Capability
and Capacity Group Principal Risk on page 35.
National Grid plc Annual Report and Accounts 2025/26
48
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Responsible Business review cont.
Our people
We are committed to
A workplace where all
colleagues can thrive
At National Grid, we believe that diversity of
thought drives innovation, enhances performance,
and strengthens our ability to deliver for our
customers and communities. We are committed to
fostering a workplace that is inclusive, respectful
and empowering, where every individual feels
welcome and supported.
Our focus is on our work environment, ensuring
colleagues are treated fairly, respecting the right to
differing opinions, and maintaining a safe work
environment. We will continue to adapt our
approach to meet the needs of our people, our
industry, and our stakeholders while staying true to
our values of doing the right thing and finding a
better way.
We are committed to
Creating an inclusive culture
Fostering a culture in which colleagues
feel safe to speak up and confident their
voices are heard by the Group Executive
Committee and Board remains a priority.
Our leaders play a central role in shaping this
culture, supported by a global learning curriculum
that provides inclusive leadership training for
people managers.
Our Employee Resource Groups (ERGs) play a vital
We are committed to
role at National Grid. Open to all colleagues, 33%
of our workforce are members of at least one ERG.
ERGs help build awareness of inclusion and
belonging by offering support and development
opportunities, enabling colleagues to bring their
true selves to work and reach their full potential.
We carry out two annual employee engagement
surveys to provide the Group Executive Committee
and Board with further insight and understanding
of our culture and engagement. In our 2025/26
survey, our employee engagement index was 81%
and our Safe-to-Say score was 73%,
demonstrating that our employees feel engaged in
their work and empowered to speak up.
Throughout the year we were recognised for
numerous industry awards, including being named
in Times Top 50 Employers for Gender Equality, a
Glassdoor 2026 Best Place to Work, 8th out of the
top 75 employers in the 2025 UK SMI, and The
Equality 100 Award: Leader in LGBTQ+ Workplace
Equality Distinction by the Human Rights
Campaign Foundation.
In 2025, we participated in the Workforce
Disclosure Initiative for the eighth consecutive year,
achieving a disclosure score of 88% compared to
the sector average of 67%.
We are committed to
Leading the industry on
employee health and wellbeing
Our employee wellbeing index is 77%.
We aim to empower our colleagues to prioritise
their health and wellbeing by promoting healthy
practices and by offering wellbeing resources
through multiple channels. By focusing on health
and wellbeing, we aim to foster an environment
where everyone can thrive together.
In 2025/26, we continued to deliver our Thriving
Together health and wellness ambition to support
our people in feeling engaged and empowered to
prioritise health, wellbeing, and performance. We
provide our colleagues with educational and
support resources, materials for managers to
promote health and wellbeing on their teams, a full
range of health and wellness benefits, support for
neurodiverse colleagues, and on-site health
professionals. We also provide digital health and
wellbeing apps and access to an Employee
Assistance Programme to our colleagues in the UK
and US.
Ensuring all colleagues receive
fair and equitable pay
We are continuing to focus on our
gender pay gap.
In the UK, we remain an accredited Living Wage
Foundation employer, which demonstrates that we
go beyond the Living Wage requirements,
voluntarily paying our trainees the Living Wage. We
undertake a Living Wage review each year to
ensure continued alignment. Our commitment to
the Living Wage for our direct workforce also
extends to our contractors. In the US, colleagues
are paid above the statutory minimums. We also
Gender demographic as at 31 March 20261
Our Board2
Senior management3
Whole company3
46%
44%
25%
Male 6
Female 5
Male 90
Female 72
Male 24,803
Female 8,214
Male
Male
Male
Female
Female
Female
1.Companies Act 2006 disclosure. We have included information relating to subsidiary directors, in accordance with the Companies Act 2006. Senior management is defined as those managers who are
at the same level as, or one level below, the Group Executive Committee. It also includes those who are Directors of subsidiaries where we have a majority interest, or who have responsibility for
planning, directing or controlling the activities of the Group, or a strategically significant part of the Group, and are employees of the Group.
2.Board refers to Directors of National Grid plc as defined on page 256 of this document.
3.In scope are active, permanent employees. Out of scope are non-employees, temporary staff and interns.
provide a range of competitive benefits to our
colleagues that go beyond statutory minimums.
When making remuneration decisions for our
Executive Directors and other senior leaders, our
People & Remuneration Committee takes account
of the remuneration arrangements and outcomes
for the wider workforce.
We review gender and ethnicity pay gaps annually
151
139
163
and our UK gender pay gap is reported one year in
arrears in accordance with UK legal requirements
on gender pay gap reporting. Our UK base gender
pay gap continues to be minimal.
Online-arrow.gif
Our gender pay gap disclosure
can be found on our website
Read-more-arrow.gif
Further information on Board workforce engagement can be found on page 95
Online-arrow.gif
Further details on our culture can be found on our website.
National Grid plc Annual Report and Accounts 2025/26
49
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Responsible Business review cont.
Our Responsible Business Fundamentals
Resp_Business_Intro BG v6.jpg
We are committed to
Safely, reliably and efficiently
connecting millions of people
to the energy they use
Health and safety
The health and safety of all our colleagues and
contractors is paramount. We require our people
to demonstrate our company-wide safety
principles of:
–Safe to Say: open and honest conversations
–Safe Choices: make smart decisions
Responsible
Business
Fundamentals
Every day, we safely, securely and reliably
connect millions of people to energy,
prioritise resilience and operate responsibly.
Our Responsible Business Fundamentals are the foundation of the pillars of our
Responsible Business Charter. We aim to continue to deliver on what is expected
of us and to be a compliant and ethical business in everything we do. We seek to
do this by ensuring safe and reliable operations and living our values, while
influencing our partners and supply chain and holding them to the same standards.
We invest in technology and governance, monitor security and risks, and advocate
for responsible business practices.
–Safe to Stop: stop the job whenever there is a
safety concern
–Safe to Learn: learn from every experience
We endeavour to mitigate risks and eradicate
injuries to our workforce, supported by our safety
management processes and Group safety
reporting system. To promote safe practices, we
maintain a full range of internal safety policies and
procedures, including our Employee Safety
Handbook and various process specific
procedures. We are also in the process of
implementing Cority, our enhanced safety reporting
system, to drive continuous improvement and
ongoing learning.
There have been no fatalities in 2025/26.
Lost time injuries (LTIs)
We have recorded a Group LTIFR of 0.11 this year,
compared to 0.10 in the prior year against our
Group target of 0.10 or less, per 100,000 hours
worked (this includes contractors working on our
behalf). The majority of the injuries were linked to
common and well-known exposures such as slips,
trips and falls, musculoskeletal injuries, and struck-
by incidents.
Various initiatives have been undertaken to
intervene with rising LTIs, including safety stand-
down days, issuance of safety refocus packs, and
various campaigns and intervention groups. We
aim to prevent serious injuries and fatalities through
a focus on our six fatal risk groups, with processes
in place to thoroughly assess and mitigate safety
risks, select and apply appropriate safety controls,
and intentionally monitor changes in the work
environment.
Injuries to members of the public
This year, there have been three incidents resulting
in injuries to members of the public which involved
our assets. These events all related to our UK
ET business.
Reliability and resilience
We have maintained reliability at 99.9% across our
networks. Details per business unit can be found on
page 28. We maintain a robust business continuity
programme to ensure we maintain operations in the
event of a disaster or significant disruption.
We are also innovating to use AI and technology to
improve grid resilience. This year, we implemented
solutions to automate crew management during
storm response, piloted x-ray imaging of gas
pipelines, and tested demand response solutions for
data centres.
Further detail on resilience in our strategy can be
found in our TCFD disclosure on page 56.
Efficiently connecting customers to the
energy they use
We aim to deliver energy to the homes and
businesses of our customers in an efficient way,
and all our business units are undertaking network
projects to improve efficiency and optimise
connections.
In UK ET, we are modernising how the network is
controlled, including making upgrades to our
control centre, and engaging with NESO on
connections reform. In the US, we’ve launched the
Kraken programme to drive efficiency in the
customer experience, and New York’s Smart Path
Connect programme is enabling large-scale
renewable interconnections.
Read-more-arrow.gif
Further information on how we operate safely and
efficiently can be found on page 17.
Read-more-arrow.gif
Further details on our initiatives to improve efficiency
can be found on pages 18 — 22.
National Grid plc Annual Report and Accounts 2025/26
50
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Responsible Business review cont.
Our Responsible Business Fundamentals
We are committed to
Influencing our supply chain
to operate responsibly
Suppliers must adhere to our Supplier
Code of Conduct which includes
We are committed to
commitments to the real Living Wage,
compliance with the Conflict Minerals
Rule and the development of
environmental strategies and targets.
This year we transitioned our supply chain
sustainability risk assessments and data to
EcoVadis, a globally recognised platform widely
used in the UK and US utility sectors. EcoVadis
provides us with enhanced visibility, assurance and
insights into our suppliers’ sustainability practices.
Our key suppliers are determined by our UK and
US supply chain science-based targets and our
strategic supplier lists. To date, over 50% of our
key suppliers hold EcoVadis scorecards and we
will continue to engage with the remainder to
increase impact and accountability across our
supplier base.
We are a partner of the Supply Chain Sustainability
School in both the UK and US, providing free
education and learning pathways to our key
suppliers.
We are
Fair to our suppliers and
committed to paying them
promptly
We recognise that timely payment is
crucial for the financial health and
operational stability of our suppliers. We
aim to adhere to the agreed payment
terms set out in contracts or purchase
orders and our finance team works
diligently to ensure that all invoices are
processed efficiently.
In the UK, we are a signatory of the Prompt
Payment Code and we also encourage our
suppliers to adopt the principles of this code. In
2025/26, 91% of our supplier payments in the UK
and 94% in the US were paid to contractual term.
Our Human Rights Policy
Human Rights are integral to our Code of
Ethics. We aim to be an ethical company
that stakeholders want to do business
with and colleagues want to work for.
We have a separate Human Rights Policy to hold
ourselves accountable to respect the rights of our
workforce, our value chain and those impacted by
our operations and to provide a safe, secure and
inclusive work environment. We also publish an
annual Human Rights Report and Modern Slavery
Statement, outlining our approach to mitigating the
risk of modern slavery in our business and supply
chain. In our annual Modern Slavery Statement we
summarise the progress we have made, our key
policies, including their scope and focus, and the
key measures we use to assess our progress and
programme effectiveness. Further details of our
human rights and modern slavery disclosures can
be found on page 234. Further information and
copies of our policies can be found in our
Responsible Business reporting centre on our
website.
We are committed to
Being a compliant and
ethical business
We are committed to maintaining high
standards of compliance and ethical
conduct. We have established rigorous
internal incident reporting to drive the
right behaviours, identify and monitor
themes and trends, and facilitate
learning.
A breach of the Code of Ethics can have different
outcomes depending on the severity and impact
on people and our organisation, including
disciplinary actions, up to and including dismissal.
Sexual harassment prevention and response is
included in our Respect at Work policy, Grievance
policy, Code of Ethics, and Supplier Code of
Conduct. Communications across the business
have taken place to highlight our expectations and
how colleagues can speak up and report
concerns.
We have a communication and training programme
for colleagues which aims to promote a strong
ethical culture and includes mandatory e-learning
for colleagues to understand and apply our Code
of Ethics. We take a zero-tolerance approach to
fraud, bribery and corruption of any kind. We have
established policies and governance that set and
monitor our approach to preventing financial
crimes, fraud, bribery and corruption, including our
Code of Ethics. These are available on our website.
To ensure compliance with relevant anti-fraud and
bribery legislation, including but not limited to the
UK Economic Crime and Corporate Transparency
Act and the US Foreign Corrupt Practices Act, we
conduct a periodic risk assessment and
continuous monitoring of ethical conduct across
our operations and ethics processes. This includes
regular fraud and ethics risk assessments and
dashboard-driven monitoring. These processes
provide systematic verification of ethical behaviour,
detection of potential misconduct, and timely
response to ethics incidents.
Ethics, compliance and business conduct matters
are discussed quarterly at the Group Executive
Audit, Risk & Finance Committee and twice a year
at the Audit & Risk Committee. Serious issues that
meet our escalation criteria are reported in line with
our escalation process to the General Counsel
Litigation and Chief Compliance Officer, Chief Legal
Officer, Chief Executive, Audit & Risk Committee
and the Board, as appropriate. Investigations are
conducted promptly and thoroughly and, where
appropriate, acted upon.
Whistleblowing
We operate confidential internal and external
helplines that are always available in all the regions
where we operate for individuals to raise concerns
about breaches of the Code of Ethics. This is
supported by our “Speak-up” policy which sets out
how we protect anonymity and have zero-tolerance
for any form of retaliation.
Whistleblowing is regularly discussed at the Ethics,
Risk & Compliance Committee and the Audit &
Risk Committee.
Artificial intelligence
We use AI to solve problems and gain insights for
ourselves, our customers and society. We
recognise the importance of developing and using
AI in a responsible manner. Our use of AI is guided
by the principles of only using AI where
appropriate, using it as a tool to streamline and
accelerate ways of working, and always
maintaining human accountability and intervention.
Our Business Management Data Standard is
reinforced by a dedicated Responsible AI policy
and controls, due diligence assessments of both
ourselves and external partners, and an AI
Governance Council.
We’ve launched a Data and AI Academy with
training programmes for employees at all levels of
AI competence to develop the skills and
knowledge they need to thrive in a data-driven
future. We continually review and update our
approach to AI in line with regulatory, sustainability,
and technological advancements.
National Grid plc Annual Report and Accounts 2025/26
51
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Responsible Business review cont.
Our Responsible Business Fundamentals
We are committed to
We are committed to
Investing in developing
technologies and innovations
National Grid Partners (NGP) has
invested c.$30.8 million in Responsible
Business aligned companies since its
creation in 2018.
This year, investments included:
–training AI models to reliably identify gas pipeline
weaknesses in x-ray imagery, improving
reliability;
–grid simulations to identify areas of underused
capacity, ideal for connecting large-load
customers; and
–AI technology for data centre demand response,
reducing the need for costly network upgrades.
Read-more-arrow.gif
Further details on technological
change can be found on page 14.
Online-arrow.gif
Find out more about our innovative projects
and investments on our NGP website.
We are
We are committed to
Ensuring we have appropriate
governance in place to deliver
on our Responsible Business
commitments
Through our Board and its five sub-committees,
including the Responsible Business Committee of
the Board, we receive strategic direction and
structure to deliver sustainable shareholder value.
We also maintain an internal Responsible Business
Management Standard that applies to all our
employees and contractors and that sets out how
we will create a positive impact while delivering
excellent customer service.
Read-more-arrow.gif
For further information on the Board and
Committees please refer to pages 88 — 126.
Ensuring security and risks –
cyber and physical – are
appropriately monitored
We are prioritising physical and cyber security, data
protection, and responsible AI through the
implementation of effective solutions which
manage vulnerabilities, ensure compliance with
regulatory requirements and fulfil reporting
obligations. All our employees undergo mandatory
cyber and physical security training. We enforce
data protection controls to comply with relevant
privacy laws and standards, such as the use of
strong passwords, regular software updates and
colleague training on best practices.
To minimise security incidents, protect customer
data and ensure the ethical use of AI, we keep up
to date with the latest trends and technologies,
collaborate with industry and government, and
share information and best practices.
Read-more-arrow.gif
Please see our Operational Group Principal Risks
on pages 32 — 33 for further information.
Working with stakeholders and
the wider industry to promote
Responsible Business topics
and advocate for action
Read-more-arrow.gif
Details on stakeholder engagement at National
Grid can be found on pages 23 — 25.
Community engagement
We engage extensively with communities affected
by our infrastructure through planning
consultations on major projects, and we use their
feedback to inform our development proposals.
Throughout the year, Board members visit
operational sites and receive updates on
community matters. This input is a key enabler for
progression of new infrastructure projects, allowing
us to support economic growth in local
communities.
International engagement
At COP30 in November 2025, we partnered with
the UK Government, Business Council for
Sustainable Energy, US Council for International
Business and other UK, US and international
organisations to participate in discussions on the
energy transition.
We focused on showcasing how we’re helping to
deliver the energy transition and on sharing best
practice with international peers. We also were able
to bring back key learnings from others to inform
our own strategy and engage our colleagues on
sustainability issues.
As part of our wider international engagement this
year, we’ve provided technical support and
participated in knowledge sharing with
governments and initiatives worldwide. Early in the
year, we welcomed a delegation of officials from
around the world on a tour of the London Power
Tunnels. Throughout the year, we hosted several
international delegations to share insights on
energy regulation, offshore wind infrastructure, and
the UK power system.
We also partnered with the British embassies in
Vietnam and Egypt and worked with global
organisations and alliances on research and
engagement. Finally, we were a major participant in
New York Climate Week and London Climate
Action Week.
Responsible political lobbying
National Grid is committed to responsible lobbying
and engagement with our elected leaders across
the jurisdictions in which we operate. We engage
with elected officials in a manner appropriate to the
jurisdiction, with attention to variations in lobbying
definitions across the geographies in which we
work.
All our lobbying and engagement is conducted in
line with the principles and targets set out within
our RBC.
We have global corporate policies on political
contributions, responsible political lobbying,
employment of former public officials and
secondment of employees into public bodies, all
accessible on our website. Our guidelines include
clear principles, an integrated management
approach, and Board accountability and oversight.
Read-more-arrow.gif
Full details of our political donations and
expenditure can be found on page 235.
National Grid plc Annual Report and Accounts 2025/26
52
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Responsible Business review cont.
Our Responsible Business Fundamentals
Transparent reporting
Transparent and public reporting is an integral part
of being a responsible business. We remain
committed to reporting our activities, commitments
and performance in a transparent manner,
including our sustainability data and performance.
Our approach
To determine which Responsible Business issues
are important to our business and essential for us
to embed in our strategy, we undertook a double
materiality assessment in 2022. The double
materiality assessment forms the basis of our
reporting. We identified six topics that encompass
the most significant factors for our business and
that align with the priorities of our stakeholders.
We are currently in the process of refreshing our
double materiality assessment to reflect the most
current internal and external environment.
We recognise the need to adapt to changes and
remain proactive in addressing emerging
challenges and opportunities. We are committed to
continuously evolving our approach and striving for
improvement to maintain robust performance on
Responsible Business.
Online-arrow.gif
Further details on our material topics and double
materiality assessment, as well as our work
against the UN SDGs, can be found on our
website.
Our Responsible Business reporting
methodology
The Directors are responsible for reporting our
Responsible Business data as of 31 March 2026,
in accordance with the reporting criteria as set out
in Our Reporting Methodology document. Our
reporting methodology document presents metric
definitions, scope and calculations and underpins
our reporting.
Online-arrow.gif
For further details, please refer to our Reporting
Methodology document on our website.
Scope of Responsible Business
reporting
Our methodology applies the GHG Protocol
operational control approach across all emissions
and environmental metrics unless stated otherwise.
Key changes to the Group’s global operations over
the past three years have been reflected in the
scope of our Responsible Business reporting,
namely:
–Grain LNG and National Grid Renewables were
disposed of in November 2025 and May 2025
respectively and are excluded from 2025/26
Responsible Business reporting, in line with our
disposals policy.
–The Electricity System Operator (ESO) separated
from National Grid on 1 October 2024, with the
NESO established under government ownership;
ESO data is excluded from 2024/25 reporting in
accordance with our disposals policy.
–Viking Link, the UK–Denmark subsea
interconnector, became operational in
December 2023 and is fully included across all
relevant Responsible Business metrics from
2024/25, following inclusion of the
“interconnector capacity” metric for 2023/24, as
it was operational by 31 March 2024.
Our reporting centre
Beyond our Responsible Business review
and TCFD statement in this report, we also
produce supplementary reports aligning to
established sustainability reporting
standards:
–Responsible Business data tables
–EU Taxonomy
–Green Financing
–SASB
–GRI
–Our Reporting Methodology
Our Responsible Business reporting centre
on our website consolidates our suite of
documents, policies and our commitment to
reporting.
Online-arrow-clear.gif
TCFD Intro Image v3.jpg
National Grid plc  Annual Report and Accounts 2025/26
53
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Task Force on Climate-related Financial Disclosures (TCFD)
Understanding
the potential
impacts of
climate change
CA 2006 requirement
TCFD recommendation
Governance
Section 414CB (2A)(a)
a) Describe the Board’s oversight of climate-related risks and opportunities: pages 54 – 55
b) Describe management’s role in assessing and managing climate-related risks and
opportunities: page 55
Risk Management
Section 414CB (2A)(b)
a) We describe the organisation’s processes for identifying and assessing climate-related
risks: page 61
b) We describe the organisation’s processes for managing climate related risks: page 61
Section 414CB (2A)(c)
c) We describe how processes for identifying, assessing and managing climate-related
risks are integrated into the organisation’s overall risk management: page  61 – 66
Strategy
Section 414CB (2A)(d)
a) We describe the climate-related risks and opportunities the organisation has identified
over the short, medium and long term: pages 62 – 66
Section 414CB (2A)(e)
b) We describe the impact of climate-related risks and opportunities on the organisation’s
businesses, strategy and financial planning: pages 62 – 66
Section 414CB (2A)(f)
c) We describe the resilience of the organisation’s strategy, taking into consideration
different climate-related scenarios, including a 2oC or lower scenario: pages: 56 – 60
Metrics and Targets
Section 414CB (2A)(h)
a) Our metrics used to assess climate-related risks and opportunities in line with our
strategy and risk management processes: pages 67 – 68
N/A
b) Our Scope 1, Scope 2 and Scope 3 greenhouse gas (GHG) emissions and the related
risks: pages 40 – 44 and 67 – 68
Section 414CB (2A)(g)
c) Our targets used to manage climate-related risks and opportunities and performance
against targets: pages 67 – 68
At National Grid, we recognise that our
networks and operations are crucial to
transforming the energy system in the
jurisdictions where we operate.
We support the Paris Agreement’s long-
term goal to keep the rise in global average
temperature by 2100 to well below 2ºC
above pre-industrial levels, and to pursue
efforts to limit the increase to 1.5ºC.
Over the past year, we have operated in
a complex environment of economic and
political uncertainty, with energy security
and affordability remaining key priorities.
As a responsible business, we respond
to these expectations across our
stakeholders. While UK policy continues
to support clean power, affordability and
system resilience are pressing challenges;
in the US, New York faces affordability
challenges and Massachusetts is behind
on key climate targets.
We fully comply with Financial Conduct Authority
(FCA) UK Listing Rule 6.6.6R(8) and align our
climate-related financial disclosures with the TCFD's
four pillars – governance, strategy, risk
management, and metrics and targets, with 11
recommended disclosures under these pillars.
Additionally, we meet the climate-related financial
disclosure requirements outlined in sections 414CA
and 414CB of the Companies Act 2006.
National Grid plc Annual Report and Accounts 2025/26
54
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Task Force on Climate-related Financial Disclosures (TCFD) cont.
Governance
The Board sets and leads the Group’s climate-related
strategy and goals, maintaining oversight of key risks
and opportunities.
Responding to climate change and supporting the
transition to net zero continue to be important
considerations in shaping our strategy. The Board
is responsible for setting the Group’s climate-
related strategy and goals, although delegates
certain responsibilities to its Committees.
Board members bring a blend of skills and
experience, including expertise in delivering
sustainability and climate change strategies. Their
backgrounds and executive experience, particularly
in the energy sector, help ensure the requisite skills
are available to support the Group’s strategy and
monitor climate-related risks and opportunities.
Several Board members, including Tony Wood,
Martha Wyrsch and Earl Shipp, bring strong
climate and sustainability experience. Martha, Chair
of the People & Remuneration Committee,
contributes extensive climate expertise from her
leadership of a major international gas transmission
business and her role in developing Vestas’ US
renewable energy operations. Earl Shipp, Chair of
the Safety & Operations Committee, adds deep
environmental and sustainability knowledge from
his long career in the chemicals industry and
service on the US Federal Reserves Energy
Advisory Committee.
Tony Wood, Chair of the Responsible Business
Committee, provides further sustainability and
climate experience from senior roles in the
aerospace and defence sector, including as CEO
of Meggitt plc where he was responsible for
leading the Group’s sustainability strategy over a
five‑year period. This included overseeing the
development of science‑based targets for Scope 1,
2 and 3 emissions in line with the Science Based
Targets initiative (SBTi). Other Board members
including Paula Rosput Reynolds, Jacqui Ferguson
and Jonathan Silver also bring relevant climate-
related expertise. See pages 91 – 93 for
information on the individual experience of Board
members and page 98 for the Board’s skill profile.
As set out on page 89, the Board Committees
were restructured during the year. As part of the
restructure, the Responsible Business Committee
was established.
The Responsible Business Committee provides
strengthened oversight of sustainability and
climate‑related matters, consolidating
responsibilities that were previously dispersed
across broader Committee remits. It now holds
explicit responsibility for tracking the Group’s
ambition and progress against its sustainability and
climate targets and commitments, meeting three
times during the financial year.
As part of its mandate, the Committee oversees
the Group Principal Risk (GPR) – Climate change
mitigation, reviewing management updates,
assessing risk‑tolerance levels and monitoring the
effectiveness of mitigation strategies.
Climate‑related risks and opportunities remain
integral to the Group’s decision‑making and
oversight. The Committee considers these matters
across strategy, including explicit consideration of
factors such as affordability pressures and fiscal
constraints that may affect the pace of
decarbonisation.
Prior to this change, climate‑related matters were
primarily overseen by the former Safety &
Sustainability Committee, which met for the final
time in May 2025, when the Committee reviewed
progress against Scope 1 and 2 targets, discussed
Scope 3 dependencies, and considered key
external uncertainties, including policy, regulatory,
technological and geopolitical factors.
In September 2025, the Responsible Business
Committee and the Audit & Risk Committee held a
joint meeting to review the Climate Change
Mitigation GPR, including management’s
assessment of the risk against the Board’s risk
appetite and the effectiveness of existing controls
and mitigation actions.
The Committees challenged whether the risk
remained within appetite, noting increasing external
pressures, and considered key risk drivers and
interdependencies, including policy and regulatory
developments, affordability and energy security
considerations. The Committees also reviewed
how climate‑related risks are monitored and
managed, including the use of key risk indicators,
emissions projections and scenario analysis, and
considered emerging risks such as climate‑related
litigation. In addition, the Committees reviewed the
Group’s approach to climate‑related reporting and
disclosures, ensuring that climate risks,
dependencies and uncertainties are appropriately
reflected in external reporting and governance
arrangements.
The Board received three updates from the Chair
of the Responsible Business Committee and one
update from the Chair of the Safety & Sustainability
Committee during the year to provide an overview
of matters discussed at its Committee meetings.
The Board also receives a Chief Executive and
business update report at each meeting which
includes quarterly reporting of climate change
metrics such as GHG emission performance
versus targets.
The Board considered climate‑related themes
across several sessions during the year, including
as part of its strategy‑focused offsite in January
2026, where wider energy transition, system
resilience and long‑term network investment
priorities were discussed alongside affordability and
regulatory considerations. Climate‑related matters
were considered within the context of the Group’s
strategic objectives, recognising the
interdependencies between decarbonisation,
security of supply and customer outcomes.
Prior to the Committee restructure, the People &
Governance Committee reviewed the composition
of the Board and its committees in the year,
applying a Board skills matrix to ensure that the
Board has an appropriate balance of skills and
competencies, including climate change matters.
The Board also considers climate-related issues
when reviewing and guiding annual budgets and
financial decision-making, including major capital
expenditure, acquisitions and divestments.
The remit of the Board and its Committees, as well
as the number of times they met and discussed
climate-related matters during the year, are set out
on pages 89 – 90.
Online-arrow.gif
Terms of Reference for the Board and its
Committees are available on our website
nationalgrid.com/about-us/corporate-
information/corporate-governance
National Grid plc Annual Report and Accounts 2025/26
55
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Task Force on Climate-related Financial Disclosures (TCFD) cont.
Governance
Board committees dia v2.jpg
Board
Responsible Business
Committee
Audit & Risk
Committee
Safety & Operations
Committee
People & Remuneration
Committee
Nomination
Committee
Responsible for Board
oversight of climate‑related
matters, including
sustainability strategy,
climate transition planning,
resilience considerations
and identification of
climate‑related risks and
opportunities, in line with the
TCFD framework.
Oversees the identification,
assessment and
management of risks,
including internal controls
and review of TCFD‑aligned
disclosures. Considers
climate‑related financial
impacts, capital allocation,
financing decisions and
metrics, and alignment of
financial planning with the
Group’s transition plan.
Monitors operational safety
and resilience, including
management of physical
climate‑related risks and
adaptation measures
impacting assets and
operations.
Establishes executive
remuneration, incentives,
skills and succession
planning, including LTPP
oversight of controllable
Scope 1 emissions
reductions and energy
transformation measures.
Ensures the Board
collectively has appropriate
skills and experience,
covering climate, energy
transition and sustainability
expertise.
Group Executive Committee
Responsible
Business Committee
Oversees Group-wide RBC
matters, including political,
societal, sustainability and
regulatory issues.
Audit, Risk &
Finance Committee
Manages and coordinates
development and delivery of
audit, risk and financial
activities across the Group,
including climate-related
principal risks.
Safety & Operations
Committee
Oversight of safety, heath and
wellbeing, asset management
and capital projects.
People & Remuneration
Committee
Sets remuneration and
oversees talent, culture, and
people risks to support Group
strategy.
Group Investment
Committee
Has delegated authority to
approve investment, acquisition
and divestment decisions,
including ASTI and NY Upstate
Upgrade.
Management forums
Sustainability Delivery
Steering Group
Drives RBC integration,
including climate strategy and
targets. Chaired by CSO with
attendance from business unit
and function senior leaders.
ESG Strategic
Steering Group
Guides and steers on ESG
strategy. Comprised of senior
leaders from Sustainability,
Finance, Legal and Corporate
Affairs.
Sustainability
Implementation Group
Implements RBC
commitments and principles.
Monitors climate progress and
shares best practice among
business peer groups.
Green Financing
Committee
Chaired by the Group
Treasurer, overseeing
governance of the
programme, including project
evaluation for green financing.
Group Sustainability
and Finance ESG teams
Responsible for the Group’s
sustainability strategy and
reporting deliverables, ensuring
credible and reliable data,
including TCFD disclosures.
Business unit level
Business units are responsible for delivering the Group’s RBC and CTP. Targets are embedded in performance contracts and progress tracked through our Enterprise
Performance Management (EPM) framework. Climate change risks and opportunities are evaluated via the Enterprise Risk Management (ERM) process (see page 30).
Management’s role
The Board delegates responsibility to management for
asset management and maintenance planning,
implementation of the net zero strategy and delivering
climate commitments and targets. This is then
considered at the relevant Group Executive Sub-
Committee. These Sub-Committees were revised in
the year to reflect the Board Committees and enable
more streamlined reporting and clearer accountability
of topics, including sustainability and climate change.
Management is also responsible on a day-to-day
basis for managing climate-related risks and
opportunities, and for reporting on progress to the
Board and its Committees.
Sustainability roles are integrated across the Group
to help ensure a top-down, bottom-up response to
climate. Our Chief Sustainability Officer (CSO) heads
a team of subject matter experts who lead the
implementation of the RBC across the Group,
working closely with business units and functions to
align strategy and operations with decarbonisation
and climate resilience targets.
The team drives the Group’s sustainability strategy,
modelling potential climate scenarios and supporting
the business to develop glidepaths aligned to GHG
emission reduction targets. They also oversee
progress on sustainable supply chain initiatives via
the Supply Chain Climate Strategy Steering Group,
collaborating with representatives from Global
Procurement to develop decarbonisation levers
through supplier engagement.
The Chief Engineer leads on climate adaptation and
mitigation activities, assessing asset climate
vulnerability and guiding investment to strengthen
network resilience. Business unit Presidents are
accountable for delivering net zero commitments.
Group Finance further supports sustainability
ambitions through its ESG Centre of Excellence
(CoE), Investor Relations and Treasury teams. The
ESG CoE sets the Group’s sustainability reporting
strategy, overseeing credible and reliable reporting of
disclosures and ESG rating agency submissions.
Investor Relations and Treasury attract green
investment, engaging with debt and equity investors
to communicate our climate strategy.
National Grid plc Annual Report and Accounts 2025/26
56
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Task Force on Climate-related Financial Disclosures (TCFD) cont.
Strategy
Our understanding of climate-related risks and opportunities
informs our strategic decision-making, as we drive
unprecedented levels of investment in energy networks.
The energy transition provides significant growth
opportunities, and we are well-positioned to
harness these, through enabling the transportation
and distribution of clean energy to homes and
businesses. Achieving this requires a major
upgrade of our networks, and we are already
delivering these improvements across the regions
and jurisdictions in which we operate.
We proactively prepare and plan for the physical
and transition risks linked to climate change.
Through scenario planning, we assess a range of
possible futures to understand the opportunities
and risks in each, ensuring our strategy remains
resilient and adaptable. Achieving our emissions
reduction goals will be challenging without backing
from policymakers and regulators.
This section summarises how we are responding
to the main climate-related opportunity facing our
business – the expansion of electricity networks to
support the energy transition – and outlines how
we use scenario modelling to evaluate climate-
related risks and opportunities.
Investing to enable the energy transition
We expect to invest at least £70 billion across our
regulated energy networks and adjacent
businesses, in the UK and US, over the five-year
period to 2030/31. Of this group capital investment,
around 85% is considered to be aligned with the
principles of the EU Taxonomy legislation as at the
date of reporting (also referred to in this report as
green capital expenditure), directly invested into the
decarbonisation of energy networks.
Under our Green Financing Framework 2025,
National Grid plc and its subsidiaries are able to
issue green financing instruments to fund our
efforts towards a cleaner energy system. Moody’s
provided a second party opinion on our updated
Framework published in May 2025 and assigned
an SQS1 sustainability quality score (excellent). See
our latest Green Financing Report on our website,
which details the issuance of green bonds totalling
£1.2 billion in 2025/26, along with the allocation of
proceeds and their environmental impact.
Having considered the climate-related risks and
opportunities on pages 62 – 66, we expect our
strategy and investment drivers to deliver strong
growth (see page 11 for further details). We
continue to focus our business on electricity, with
our most recent projections suggesting that over
80% of Group assets are expected to be electric
by 2030/31.
Growth in clean generation and increased demand
for electricity is driving a need for larger, smarter
electricity networks, alongside ensuring existing
energy networks remain resilient and reliable. We
are connecting more new generation and load
faster than ever before, enabling economic growth,
bolstering energy security and supporting cleaner,
affordable energy for our communities and
customers on both sides of the Atlantic. This is a
significant climate-related financial opportunity, and
key activities we are undertaking to support clean
energy supply and electrification are outlined on
page 44.
As part of our strategy to focus on networks and
streamlining our business, we completed the sale
of National Grid Renewables, our US onshore
renewables business, and Grain LNG, our UK
LNG asset.
In seeking to achieve our net zero target and
support decarbonisation, we will leverage our
strong financial position and investment-grade
credit ratings to finance key investments for net
zero energy transmission and distribution.
Following the successful £7 billion Rights Issue in
2024/25, our balance sheet, backed by valuable
assets and strong credit ratings, is flexible and well
positioned for growth. We secure funding through
borrowing and shareholder investments, adhering
to regulatory rules, and closely monitor the financial
health of our UK and US operations to maintain
appropriate gearing ratios.
As asset growth and earnings become increasingly
aligned, this will support shareholder returns while
preserving balance sheet capacity. Beyond the
next five years, we remain confident in our balance
sheet strength and maintain a broad range of
funding options, including substantial headroom in
hybrid debt capacity, should it be needed.
We, alongside other network companies, have a
unique role to play in supporting system
decarbonisation. By building out the network of the
future, we seek to enable the deployment of low-
carbon energy supply to meet society’s growing
electricity needs while bringing down emissions.
Our Climate Transition Plan, which is aligned with a
1.5°C scenario, identifies the policy and regulatory
support required for future investments aimed at
decarbonising the energy sector and reducing
emissions. For our performance details against the
CTP refer to pages 40 – 44.
Scenario modelling
We use modelling to test how robust our Group
strategy is to a range of future scenarios out to
2050. Our scenarios are used to inform our
sustainability approach and assess progress
against our climate target commitments.
Transition scenario modelling
Our transition scenarios out to 2050 are tailored to
our UK and US business environments.
Our “Delayed” scenario represents a world with
higher warming levels, where governments,
industry and consumers do not pursue the
transition at pace.
Our “Balanced Pathway” scenario sees
approximately 2°C of warming, with the energy
transition progressing at pace but supply chain,
policy and cost challenges preventing our
jurisdictions from hitting targets.
Our “Electric Net Zero” scenario sees
approximately 1.5°C of warming, with governments
and industry prioritising decarbonisation goals
through supportive policies and regulatory reforms.
Our scenarios reflect possible actions and
conditions within our jurisdictions; the associated
°C ranges within our pathway titles are used as
reference labels for external conditions, rather
than implying corresponding global temperature
outcomes, which depend on cumulative
global emissions.
As part of our ongoing risk management processes,
we continually monitor changes in the external
environment and assess implications for our
scenarios. While our modelling is subject to
limitations, including data availability across other
sectors, we mitigate these through the use of diverse
sources and external scenario benchmarking.
Our scenarios are not intended as predictions, but
as tools to enhance our understanding of potential
climate-related risks and opportunities. Along with
our strategic planning and risk management
approaches, these scenarios guide us in identifying
material climate-related risks and opportunities as
set out on pages 62 – 66.
National Grid plc Annual Report and Accounts 2025/26
57
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Task Force on Climate-related Financial Disclosures (TCFD) cont.
Strategy
Transition scenario descriptions, assumptions and inputs
Scenario: Climate change by 2100 vs. pre-industrial levels (approximate)
Scenario
Targets
Macroenvironment and policy
Generation
Demand
Delayed
2-4°C
–Decarbonisation progresses
but is insufficient to meet net
zero in 2050
–Geopolitics disrupts
established trade flows, with
supply chain impacts
–Policy delays
–Wind and solar deployment continues slowly with thermal
generation staying online longer to support load growth
–Reduced opportunities for further interconnection growth
beyond what is in the pipeline
–Total energy consumption reduces 18% by 2050
–Electricity demand increases 108% by 2050
–Gas heating dominates, with low uptake of heat pumps due to limited policy support
–EV uptake stagnates due to cost
Balanced
Pathway
2°C
–Decarbonisation progresses
but falls short of near-term
targets with ~10-year delay to
Clean Power 2030
–Geopolitical tensions continue,
but with gradual recovery of
supply chains
–Policy incentives maintained
with reforms over time
–Wind and solar deployment continues but misses targets,
while gas for the power sector still has a role to play in the
2030s beyond the maximum 5% of power generation
targeted in Clean Power 2030
–Interconnector projects progress at pace
–Total energy consumption reduces 31% by 2050
–Electricity demand increases 112% by 2050, mainly because of electrification of heat and
transport, green hydrogen production and data centre expansion
–Heat pump growth restricted to new build houses. Current houses converting off gas heating
continues at current rates
–EVs continue to grow at the current rate with the Zero Emissions Vehicles mandate in place
Electric
Net Zero
1.5°C
–Delayed achievement of Clean
Power 2030, with economy-
wide net zero by 2050
–Geopolitical tensions ease,
with robust and diversified
supply chains and increased
international collaboration
–Policy progress accelerates
and supports increasing
investment and target delivery
–Strong renewable expansion supported by distributed
flexibility and storage, with some abated gas capacity
providing dispatchable supply
–Increased collaboration and coordination results in faster
adoption of offshore hybrid assets and overall increased
interconnectors
–Total energy consumption reduces 32% by 2050, as more efficient electric technology
replaces combustion technology
–Electricity demand increases 127% by 2050 with near-complete electrification of demand
sectors such as heat and transport
–Heat pumps mandated in existing homes as well as sufficient subsidy to support wide-
spread adoption
–Widespread EV adoption as policies achieve targets
Delayed
2-4°C
–Achieves ~50% reduction in
energy-related emission from
1990 levels by 2050
–Policy prioritises affordability
–New gas infrastructure to address resource adequacy
–No offshore wind added beyond what is fully permitted and
currently under construction
–Some large onshore renewables are added each decade as
states continue to pursue renewable targets but at a
delayed pace
–Total energy consumption reduces 22% by 2050
–Electricity demand increases 58% by 2050
–State subsidies are scaled back, resulting in low uptake of heat pumps
–EV adoption stagnates in the near term driven by fewer federal incentives, although increases
as costs decline in the 2030s
Balanced
Pathway
2°C
–Softening in decarbonisation
targets, achieves ~60%
reduction in energy-related
emissions by 2050
–Softening in decarbonisation
targets due to affordability
concerns
–No new fossil units or major enhancements to existing plant,
with limited gas repowering
–Offshore wind stalls through 2035, then existing lease areas
are gradually built out driven by energy needs, given no
politically viable alternatives
–Onshore renewables deployment increases steadily but
roughly 10 years behind stated policy goals
–Total energy consumption reduces 36% by 2050
–Electricity demand increases 64% by 2050
–Heat pump adoption increases steadily as costs fall, capturing 45% of heat demand by 2050
–Slow adoption of EVs through the 2030s after Federal incentives end in 2025, with full
competitiveness and growth upswing by 2035
Electric
Net Zero
1.5°C
–Clean electricity targets lag
through 2035, but energy-
related emissions achieve
~85% reduction in line with
overall state emissions targets
by 2050
–Policy prioritises clean power
and decarbonisation
–Existing gas capacity retained for emergency back-up
–New nuclear plays a larger role in decarbonisation
–Offshore wind picks up in the 2030s becoming the leading
source of electricity generation in the region
–Onshore renewables deployment continues to meet the net
zero goals
–Total energy consumption reduces 67% by 2050
–Electricity demand increases 78% by 2050
–Heat pump adoption increases with falling costs, capturing 70% of heat demand by 2050
–Widespread EV adoption in line with policy targets
transition scenario_Loz.jpg
Delayed 2-4°C
Represents a world where governments, industry and consumers do not pursue
the transition at pace, meaning our jurisdictions miss climate targets.
Balanced Pathway 2°C
Energy transition drives forward at pace, but ongoing supply chain challenges,
policy implementation delays, and short-term financial concerns mean our
jurisdictions narrowly miss targets.
Electric Net Zero 1.5°C
Governments prioritise the achievement of decarbonisation goals through
supportive policies and regulatory reforms, new load is met through clean power
sources.
National Grid plc Annual Report and Accounts 2025/26
58
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Task Force on Climate-related Financial Disclosures (TCFD) cont.
Strategy
Transition scenario outputs
UK
US NY
US MA
Annual
electricity
demand,
TWh
Delayed
2–4°C
Balanced pathway
2°C
Electric Net Zero
1.5°C
1
37
97
25
49
73
13
61
85
US NY
US MA
2024
2035
2050
2024
2035
2050
Annual
natural gas
demand,
MMBTU
Delayed
2–4°C
815m (2024)
910m
994m
270m (2024)
301m
339m
Balanced Pathway
2°C
815m (2024)
835m
699m
270m (2024)
270m
220m
Electric Net Zero
1.5°C
815m (2024)
627m
211m
270m (2024)
196m
65m
Note: Using 2024 data for natural gas demand in New York and Massachusetts, as 2025 data is not yet available.
UK
US NY
US MA
Total
renewable
generation,
TWh
Delayed
2–4°C
Balanced Pathway
2°C
Electric Net Zero
1.5°C
217
253
2025: 1.1
2035: 2.2
2050: 2.1
Total: 5.4
3.2
289
229
265
277
241
301
313
UK
US NY
US MA
Number of
passenger
EVs, millions
Delayed
2–4°C
93% of car fleet by 2050
70% of car fleet by 2050
70% of car fleet by 2050
Balanced Pathway
2°C
96% of car fleet by 2050
70% of car fleet by 2050
70% of car fleet by 2050
Electric Net Zero
1.5°C
100% of car fleet by 2050
87% of car fleet by 2050
88% of car fleet by 2050
109
145
181
121
157
169
133
193
205
UK
US NY
US MA
Number of
residential
heat pumps,
millions
Delayed
2–4°C
Balanced pathway
2°C
Electric Net Zero
1.5°C
2024: 0.08
2035: 0.35
2050: 0.49
Total: 0.92
2.3
416
452
488
0.68
404
440
476
392
428
464
2025
2035
2050
Note: NY refers to New York State, MA to Massachusetts. UK Delayed and Electric Net Zero scenarios based on 2024/25 inputs.
US NY Heat Pump numbers are based on 2024 data as 2025 data is not yet available.
Circle_Dk-Blue.gif
Circle_Mid-blue.gif
Circle_Dk-Gray.gif
Note: Graphics are not to scale.
National Grid plc Annual Report and Accounts 2025/26
59
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Task Force on Climate-related Financial Disclosures (TCFD) cont.
Strategy
Changes since last year
We have retained our scenario framework from last
year, which presents a wide range of energy
transition outcomes. They reflect the tensions or
trade-offs governments may need to manage. We
regularly update our Balanced Pathway scenarios
for the US and UK. Our Electric Net Zero and
Delayed scenarios are long-term outlooks and we
do not update them as frequently. The inputs for
our US Delayed and Electric Net Zero scenarios
have been updated since last year to reflect
market, policy and technology shifts, while the UK
Delayed and Electric Net Zero scenarios remain
consistent with our 2024/25 Annual Report. We will
continue to monitor the evolving market, policy and
technology landscape and consider any revisions
to our UK Delayed and Electric Net Zero scenarios
as appropriate.
Transition scenario insights
We assess the resilience of our business strategy
against our transition scenarios, with a particular
focus on the Electric Net Zero scenario, given
the greater level of action required to deliver
decarbonised energy systems. The following
five transition insights are most relevant to a
1.5°C scenario.
1. Achieving energy transition targets
depends on effective reforms to drive clean
power deployment and policies that
incentivise consumer uptake of low-carbon
technologies
Policy interventions will continue to be a key
enabler of the transition. Our ability to meet our
own climate commitments relies on these.
Government support for both supply-side and
demand-side clean technologies is important to
achieve policy targets. This extends to key enabling
policies regarding connections, planning and
permitting, as necessary preconditions for our
jurisdictions to accelerate in line with targets.
Without additional support, despite technology
cost declines, there will be a financing gap for
some clean technologies.
2. Electricity use and share of final demand
will increase driven by consumer
electrification and large demand customer
growth (e.g. data centres)
As more consumers switch to electric vehicles and
heat pumps, electricity demand will increase. Rapid
growth of data centres and the rise of AI, alongside
industrial electrification, is a potentially significant
additional driver of demand. In the UK, we expect
electricity demand to increase 50% by 2035 and
more than double by 2050. In our states in the US,
we expect an increase of around 30% by 2035 and
more than 50% by 2050. These projections could
increase if the pace of electrification accelerates,
with the growth of AI and associated power needs
a key variable. Rising electrification will continue to
drive additional growth and investment in our
electricity network.
3. Energy supply structure will continue
to shift
Renewable capacity will continue to grow globally,
to meet electricity demand growth and replace
fossil fuel generation. Other low-carbon
technologies are also seeing a resurgence in
growth, including nuclear, with growing momentum
for next generation technologies such as small
modular reactors. Battery storage capacity and
other flexible assets continue to advance, with
some technologies already commercially scalable,
and supporting system balancing and curtailment.
4. Pathways will adapt to global and
local realities
Our governments continue to actively shape energy
policy, and we expect to see different energy
transition pathways across our jurisdictions. In the
UK, the Government has continued to drive
progress towards its Clean Power 2030 Action
Plan, breaking further records in recent renewable
auctions. In the US, the Federal Government
remains focused on energy abundance, through
natural gas and expanding energy infrastructure.
Our states continue to pursue climate targets and
policies, while seeking to balance these with other
priorities including affordability.
5. CTP achievement will be challenging in
slower scenarios
Our ability to achieve our climate targets is closely
linked to the decarbonisation of the energy
systems in the jurisdictions in which we operate.
We have always viewed our climate targets as
ambitious, and meeting our targets is contingent
on a range of dependencies. Slower scenarios
present greater challenges to meeting our targets,
and in some we will not be able to meet our
targets. Moving forward, we will continue to evolve
and refine our approach based on progress and
developments in the external landscape.
Conclusion
None of the transition scenarios tested
materially threaten the Group's resilience,
and we are well positioned to adapt our
portfolio to maximise the opportunities of
the energy transition, with no significant risk
of a material adjustment to the carrying
amounts of assets and liabilities in the next
annual reporting period.
Read-more-arrow.gif
Further detail on the transition risks and
opportunities identified in our scenario analysis,
including estimated qualitative and quantitative
impacts where applicable, can be found on pages
62 – 66.
TCFD Strategy Image.jpg
National Grid plc Annual Report and Accounts 2025/26
60
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Task Force on Climate-related Financial Disclosures (TCFD) cont.
Strategy
Physical scenario modelling
We use Group-wide climate scenarios to assess
our vulnerability to climate change. These scenarios
benchmark global progress toward limiting warming
to 1.5°C in line with the Paris Agreement and
evaluate how physical climate impacts – such as
extreme weather and long-term changes in weather
patterns – could affect our business.
Descriptions, assumptions and inputs
Climate hazard data is sourced from national
climate assessments in the UK (UKCP18) and US
(CMIP5). Scenario modelling uses the
Intergovernmental Panel on Climate Change
(IPCC’s) Representative Concentration Pathway
(RCP) of RCP8.5 (4°C) and RCP4.5 (2°C) across
future decades (2030s–2070s), compared with
1981–2010 (UK) and 1976–2005 (US) baselines.
While climate projections are inherently uncertain –
due to natural variability, model limits, and imperfect
observations – these uncertainties should not delay
action to mitigate or adapt to climate change.
Outputs
Most climate hazards are expected to become
more frequent, with high temperatures and coastal
and river flooding posing the greatest risk across
our operations. Risks are generally higher in a 4°C
scenario than a 2°C scenario.
Wildfire risk remains lower in our territories
compared with areas such as the western US, but
we have strengthened situational awareness and
operating procedures. We recently completed a
third-party wildfire risk assessment for our US
jurisdictions and are in the process of initiating one
in the UK, helping us identify vulnerabilities and
develop mitigations.
We have advanced our physical risk analysis to
guide strategic planning and investment. Our
Climate Change Risk Tool (CCRT) uses geospatial
capability to provide tailored physical risk
assessments for each mapped business area while
still maintaining a Group-level view. We aspire to
further develop the CCRT to account for portfolio
changes and incorporate additional infrastructure
data points in areas like NGED, NGV and SI to
refine our overall risk picture.
Climate Vulnerability Assessment (CVA)
Using CCRT insights, we conduct a Group-wide
critical climate risks.jpg
Climate Vulnerability Assessment (CVA) to evaluate
how climate change could affect our assets over
the coming decades. This is typically performed on
a five-year basis, and we anticipate completing the
next Group-wide CVA in 2028.
Understanding changing climate conditions and
asset risk allows us to develop appropriate
mitigations to protect existing assets and build
climate resiliency. The CVA follows a phased risk-
based approach to identify high-risk assets and
develop adaptation plans. Outputs of the CVA
process include business-specific vulnerability
assessment reports, equipment specification
updates, external engineering standards, asset
policy changes, discrete investment projects and
CCRT development.
Each business unit identifies critical assets
vulnerable to climate hazards, accounting for
existing adaptation measures and the latest climate
science. Adaptations are locally developed to inform
standards, capital investment, and broader industry
alignment. Given that many of our assets have
lifespans of 50+ years, future climate hazards must
be considered upfront in planning to avoid
premature asset repair or replacement. For
example, a site not currently at risk of coastal
flooding may become vulnerable within a decade
based on climate projections. Understanding future
climate hazards allows us to make informed design
decisions and resiliency investments to protect our
Group’s assets and improve reliability for customers.
The Climate Resilience Working Group is attended
by representatives from across our business units
who meet monthly to discuss best practice,
particularly related to climate assessments and
response. Additional detail on our actions to
anticipate and respond to climate-related
disruptions is on page 35 and information on
business unit level assessments is on page 66.
The climate hazards most significant to us are summarised below.
Group-level critical climate risks
Vulnerability
High temperatures
and heatwaves
Risk of power failure, equipment overheating,
warmer air temperatures contributing toward
accelerated ageing, reduced capacity of
transmission and distribution lines.
Sun_Icon.gif
C_Md-Blue_Icon.gif
A_Dk-Grey_Icon.gif
Cold weather
Ice accretion overloading overhead lines,
structural failure.
Snow_Icon.gif
A_Dk-Grey_Icon.gif
Lightning
Risk of power failure, short-circuit faults,
and equipment deterioration.
lightning-bolt.gif
A_Dk-Grey_Icon.gif
Flooding/Erosion
Risk of power failure, accelerated asset
corrosion, debris damage, equipment
submersion and water infiltration, soil erosion.
Flood_Icon.gif
C_Md-Blue_Icon.gif
A_Dk-Grey_Icon.gif
Extreme wind
Structural failure to overhead lines due to
extreme wind exceeding design standard and
vegetation contact.
Wind_Icon.gif
A_Dk-Grey_Icon.gif
Risk descriptions
C_Md-Blue_Icon.gif
A_Dk-Grey_Icon.gif
Chronic
physical risk
Gradual, persistent impact over a longer sustained period
Acute
physical risk
Immediate, high-severity impact concentrated in a short period
National Grid plc Annual Report and Accounts 2025/26
61
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Task Force on Climate-related Financial Disclosures (TCFD) cont.
Risk Management
Climate change is fully integrated into our
enterprise risk management framework.
Climate change and ERM
Climate change is a key Group risk factor and is
fully integrated into our enterprise risk management
framework. We consider both physical and
transition risks, and their potential impact on our
business operations, financial performance, and
reputation. For more information on our ERM
framework, which remains consistent with the prior
year, please refer to page 30.
We manage two climate-related Group Principal
Risks (GPR):
1.Climate change (mitigation GPR): This risk
aligns to the strategic objective Enable the
energy transition for all, with a focus on
delivering clean, decarbonised energy to meet
our net zero goals (refer to page 33).
2.Loss of supply1 (adaptation GPR): Physical
climate risks are incorporated into the Loss of
supply control framework to support system
resilience and the safe, reliable delivery of energy
(refer to page 35).
This structure provides clear oversight and
accountability – mitigating risk, and maximising
opportunities – in line with Group risk appetite.
1.Significant disruption of energy was renamed to Loss of supply
during 2025/26 to better reflect the nature of the risk, and reflect
that upstream supply considerations are included as a key cause.
Other GPRs affected by climate-related transition
and physical risks include Major capital
programmes which become more significant in a
1.5°C scenario, requiring proactive management
and intervention. Physical risks also contribute to
our Significant safety or environmental event risk,
reinforcing the need for robust safety and
environmental disciplines. Acute physical risks are
already occurring and are expected to increase in
frequency and severity, with greater long-term
impacts under a 4°C scenario.
We routinely horizon scan and track critical energy
transition trends. We monitor key indicators and
metrics against established thresholds and assess
these against our strategy and business plans.
Emerging risks are identified and managed through
our ERM processes with outcomes shared,
reviewed and challenged by senior leadership (refer
to page 30).
Climate-related risk management is embedded
across all levels of the organisation and follows the
Group’s established “Three Lines” model (see page
30).
Group Risk Taxonomy
The Group Risk Taxonomy enables the business to
classify any climate change risk under four
categories – strategic, operational, financial, and
compliance – with more detailed sub-categories
and assigned risk appetites. All GPRs are subject
to a detailed annual review and treated as equally
important and not prioritised.
Despite external pressures, our climate-related risk
exposure remains broadly stable, with most risks
within appetite. These risks primarily fall under our
strategic and operational categories.
How we manage and monitor our
climate-related risks
As part of our risk management process, we have
defined key controls to manage both climate
change mitigation and adaptation risks.
Mitigation controls align with our strategy and
regulatory frameworks and extend across other
relevant risks such as regulatory outcomes, political
and societal expectations, and loss of supply.
These key controls focus on tracking progress
against targets, identifying transition-risk triggers,
and implementing appropriate actions and
solutions. Our material climate change mitigation
controls include the following:
–Business unit action plans: These are
designed to ensure each business unit can
deliver climate change goals to support the
delivery of Group emission reduction targets in
line with our vision and strategy.
–Governance: Our top-down, bottom-up
approach to sustainability governance across all
levels of the organisation (described on page 54)
drives performance and holds business units to
account.
–Responsible Business reporting: We annually
report on our performance, transparently
documenting progress and dependencies
against our commitments.
Assessing our climate-related financial
risks and opportunities
Our GPRs are rated on a scale of 1 to 5 across
financial, reputational, and likelihood categories.
Financial ratings reflect increasing monetary
impact, while reputational ratings range from
“internal” to “international”.
The overall indicative risk score is calculated by
multiplying likelihood by the greater of financial or
reputational impact, consistent with the stress-
testing methodology used for our Viability
Statement (page 86).
For TCFD disclosures, we build on this internal
assessment of impact, timeframe and likelihood by
incorporating market data and insights from
subject matter experts across the Group. Short-
term time horizons consider the current effects of
climate-related risks and opportunities while
medium- to long-term consider the
anticipated effects.
We assess material climate-related risks and
opportunities over short, medium, and long-term
horizons, aligned with strategic business planning,
investment and financial forecasting processes.
Conclusion
Our financially material climate-related risks
and opportunities, along with how we
measure and respond to them, are outlined
on the following pages.
Across all pathways, including worst-case
scenarios, none of the identified risks
undermine the Group’s resilience.
We remain well-positioned to adapt our
portfolio and respond to opportunities from
the energy transition.
Reducing uncertainty for uncontrollable
risks through building resilience into
operations and influencing regulatory
outcomes remains essential.
risks background new.jpg
National Grid plc Annual Report and Accounts 2025/26
62
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Task Force on Climate-related Financial Disclosures (TCFD) cont.
Risk Management
risks background new v2.jpg
1. Transition Risk
Demand for natural gas is
uncertain in long-term scenarios
Risk/opportunity
Policy and legal
Gas is expected to continue to play an important role across
our US jurisdictions, including the gas assets we own and
operate today. However, achieving net zero will require
progressive decarbonisation of energy networks over the long
term, with the future role of gas shaped by economic,
technological, legal, policy and regulatory developments.
Over the next decade, natural gas demand is expected to
remain robust, reflecting affordability and regional economic
priorities. Over the longer term, net zero pathways assume
increased electrification, including for heating, which would
raise electricity demand and reduce gas consumption, with
implications for the useful economic lives (UELs) and elements
of our gas network assets.
Business units potentially affected:
NY and NE
Asset group(s) potentially affected:
Gas Distribution and Generation
Timeframe
Likelihood
Measurement indicators:
–Gas UEL sensitivities
–GHG emissions
–CTP
Potential impact
Massachusetts and New York are pursuing accelerated
decarbonisation pathways centred on electrification, which may
reduce long‑term demand for gas heating and shorten the UELs of
certain gas network assets as policy, regulatory and planning
frameworks evolve. Current regulatory frameworks continue to
support capital investment, cost recovery and returns for gas
networks to maintain a safe and reliable service, and while new
customer connections may be constrained, there are no regulatory
mandates requiring the forced conversion of existing gas customers.
State net zero pathways assume a rapid near‑term acceleration in
heat pump adoption, which is a key indicator of electrification and
future gas demand. Achieving material reductions in gas reliance
would also require significant investment in supporting electric
infrastructure. However, recent setbacks to renewable energy
development have increased delivery risk in Massachusetts and New
York. The transition scenario outputs summary on page 30 illustrates
the KPIs relative to the accelerated deployment required under
forecast transition scenarios.
More frequent cold weather events across New York and
Massachusetts underscore the importance of resilient energy
infrastructure. Given the likelihood of recurring extreme cold weather,
many customers are expected to adopt partial electrification
solutions, retaining gas connections for reliability and backup.
Full electrification scenarios appear challenging due to high costs,
customers opting for gas, and existing challenges on the electric
infrastructure to support increasing load in the short term.
We have performed sensitivity analysis to assess the impact on our
Short
Medium
Long
Group financial results of shortening the UELs of our gas business
assets, which for 2050 illustrates an unlikely worst-case scenario.
Please refer to note 13 Property, plant and equipment for more
Very Low
Low
Moderate
High
Very High
details.
Our response
We support the decarbonisation of energy networks while
recognising that gas is expected to continue to play an important,
though evolving, role over the medium to long term, including
through our existing gas assets, with its future role beyond 2050
dependent on economic, technological, legal and regulatory
developments. In assessing the UEL of these assets, we consider
multiple demand pathways reflecting customer behaviour,
electrification pace and affordability, the potential role of low‑carbon
fuels, and jurisdictional net zero ambitions, noting that while New
York and Massachusetts prioritise large‑scale electrification,
challenges remain in meeting near‑term targets.
Notwithstanding long‑term policy objectives, safety and reliability of
the gas network remain key priorities for both National Grid and
regulators. This is evidenced by continued regulatory support for
targeted gas infrastructure investment, including approval of cost
recovery and allowed returns where investment is required to
maintain safe and reliable service. On 7 November 2025, the New
York Department of Environmental Conservation approved permits
for the Northeast Supply Enhancement (NESE) pipeline, which, while
not Company‑owned, will supply gas solely to National Grid and has
been incorporated into our long‑term planning assumptions. The
December 2025 adoption of the New York State Energy Plan further
signals ongoing regulatory recognition of the role of gas infrastructure
in meeting system reliability and policy objectives.
Alternative pathways considered in regulatory proceedings could
also support continued use of gas assets, including as a back‑up
fuel during peak winter demand or through lower‑carbon fuels. Our
US fossil‑fuelled generation assets are currently expected to be
materially depreciated by 2040, aligning with New York State’s
zero‑emissions electricity target. However, due to system reliability
needs, fossil-fuel generation assets may continue to operate beyond
2040. During recent extreme weather events, these assets provided
critical system reliability, including increased steam generation during
a winter cold snap and record daily output at the Northport plant
during a late-June heatwave. As such events become more
frequent, existing assets can continue to support grid resilience and
climate adaptation.
Time horizons:
Likelihood:
The timeframes we have used to assess the climate-related risks and opportunities are:
Our likelihood assessment is an indicative estimate of the probability for material financial impacts with
reference to the following categorisation:
Up to one year
In line with our annual planning and
shorter-term budget process.
From two to ten years
Reflects our strategic business
planning process period.
Ten years plus
Aligns with our longer-term emerging risk assessment timelines,
up to the date of our net zero commitment.
We use our ERM risk assessment scoring scale to categorise the likelihood of our climate change risks and
opportunities.
These time horizons largely align with our planning and forecasting process timelines,
with some buffers to reflect the regularity of updating scenarios.
Very Low
Low
Moderate
High
Very High
Short
Medium
Long
risks background new.jpg
National Grid plc Annual Report and Accounts 2025/26
63
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Task Force on Climate-related Financial Disclosures (TCFD) cont.
Risk Management
2. Transition Risk
Uncertainty in the extent
of electricity demand growth
Risk/opportunity
Market, policy and legal
Electricity demand growth is projected in all scenarios, but
there is uncertainty about the pace and scale of this growth.
A wide range of factors may influence the trajectory, including
political, technological and market trends, and associated rates
of consumer adoption. AI adoption is forecast to drive electricity
load growth, with data centres already a major contributor to
growth in connection demand queues, but there remains
uncertainty including scale of adoption and location. Electricity
demand growth is a key driver of long-term network planning.
This is further complicated by the growth of embedded
generation and flexibility.
Business units potentially affected:
All
Asset group(s) potentially affected:
Electrical Distribution and Transmission
Timeframe
Likelihood
Measurement indicators:
–Network reliability
–UK and US power networks
–Capital investment
Short
Medium
Long
Very Low
Low
Moderate
High
Very High
Potential impact
It is important to accurately forecast demand to right-size the networks
of the future.
If electricity demand is underestimated, there is a risk that the electricity
transmission and distribution networks we operate may not be able to
accommodate the scale of demand growth required to support the
energy transition. This could result in National Grid slowing the pace of
electrification and potentially affect both the reliability of our services
and the delivery of our sustainability objectives, with financial and
reputational risks.
If electricity demand is overestimated, there is a risk of over‑investment
in network assets, increasing energy system costs at a time when
consumer affordability is strained. This would undermine the trust and
confidence of both consumers and regulators, potentially damaging our
reputation and credibility in the market.
Given this two-way risk would likely materialise over the medium to long
term, it is not possible to reliably quantify this risk at this time.
Our response
It is important that governments continue to set clear policy
commitments to provide strategic direction to National Grid
and the wider industry. System planners and regulators play
important roles in providing independent assessments of demand
growth, and we continue to work closely with them to ensure our
plans are flexible and responsive to changing needs. We
undertake our own internal analysis, based on decades of
experience in energy infrastructure development, to model
different futures with varying electric demand growth. This is
supported by close stakeholder relationships across wider
industry and government.
In the UK, NESO has a central role in the strategic planning of
Great Britain’s energy system. Given the scale of electricity
demand growth, we are delivering no-regret anticipatory
investment to future-proof the network. In UK ET, we are making
good progress through the ASTI regime created by Ofgem, and
have integrated anticipatory approaches into our RIIO-T3 plan.
Ofgem’s RIIO-T3 Final Determinations include mechanisms to
respond to projects that may be required by NESO’s Centralised
Strategic Network Plan. We are developing our business plan for
RIIO-ED3, with tools and mechanisms to address uncertainty. Our
DSO governance panel plays an important role in providing
rigorous, independent challenge to our plans.
In the US, investment is prioritised based on system performance,
engineering needs, and execution strategy, and we continue to
deliver efficient solutions to enable electricity demand growth such
as energy efficiency, demand response, and other non‑wires
alternatives. We regularly measure and report our network
reliability across the transmission, distribution and interconnection
network (refer to page 28).
risks background new.jpg
National Grid plc Annual Report and Accounts 2025/26
64
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Task Force on Climate-related Financial Disclosures (TCFD) cont.
Risk Management
3. Transition Risk
There are several dependencies
which affect our ability to deliver our
commitments, including supply
chain, talent and finance
Risk/opportunity
Reputation and market
We are playing our role in delivering an unprecedented
transformation of energy systems, with associated delivery risks
across areas within our strategic influence. These areas
primarily include, but are not limited to, supply chains,
workforce capability and access to capital. Our energy
networks are critical to enable the flows of energy from cleaner
generation to decarbonised demand, and delays to delivery
could jeopardise wider societal decarbonisation goals.
Assuming broader supportive and aligned external conditions
exist, such as political, regulatory and technological, failure to
effectively execute within areas under National Grid’s strategic
influence could result in reputational harm and market
consequences. There may be reputational and market impacts
if we fall short of our own ambitious GHG emissions targets.
Business units potentially affected:
All
Asset group(s) potentially affected:
Electrical Distribution and Transmission, Gas Distribution
Timeframe
Likelihood
Measurement indicators:
–GHG emissions
–Network reliability
–Proportion of renewables in energy mix
–Customer satisfaction (US)
–Cumulative green bonds on issue
–Capital investment
–Supply chain engagement
–Employee engagement index
Potential impact
The external context in which we operate has evolved significantly,
particularly across political and regulatory frameworks, technological
developments, affordability considerations, and customer expectations.
While these broader factors are captured within our Group Principal
Risks, this transition risk scenario focuses on the potential reputational
and market consequences arising from our execution across areas
under National Grid’s strategic influence. Assuming supportive external
conditions, ineffective delivery could adversely affect stakeholder
confidence, with implications for investors, regulators and other key
stakeholders. Further detail on Group Principal Risks and related
management actions is provided on pages 32 – 37.
Our businesses in the US and UK both depend on, and compete in, a
global market for materials and equipment, talent and green finance. To
deliver at the pace and scale required, we need to purchase
equipment, including assets with long lead times and constrained
global supply in the right timeframes. We also need to compete
effectively for talent, to deliver significant network reinforcement as well
as maintaining a robust and reliable network. Attracting investment
underpins our ability to deliver this reinforcement. It is crucial that we
have investable regulatory frameworks with the right return on and of
capital. These regulatory frameworks include incentives and penalties.
Our supply chain, talent and financing need to operate in conjunction
to successfully deliver investments, and failure could result in
materially lower financial performance, impacting our share price and
EPS projections. It could also damage our relationships with our
trusted stakeholders, including our investors, regulators and
customers, and potentially position National Grid as an obstacle rather
than an enabler in the energy transition. The wider economy is
dependent on the energy sector to enable their decarbonisation plans,
with the ability to connect to our transmission and distribution
networks in a timely manner.
Short
Medium
Long
Given this risk would likely materialise over the medium to long term, it
is not possible to reliably quantify this risk at this time.
Very Low
Low
Moderate
High
Very High
Our response
Climate-related targets are embedded into our internal performance
management and incentives, maintaining our focus on ensuring the
supply chain, talent and financing is in place to deliver on our
commitments. The Responsible Business section (pages 40 – 44)
sets out our progress against our Group CTP – our roadmap to a
vision of reaching net zero. We continue to work closely with
stakeholders, including regulators, to ensure policy and regulatory
frameworks enable and facilitate our net zero plans.
We continue to deliver transformative new approaches to strengthen
our supply chains. In the UK, building on pioneering initiatives
including the Great Grid Partnership, in July 2025 we launched our c.
£8bn Electricity Transmission Partnership to unlock long-term supply
chain capacity and skills. In New England, we have established
strategic contractor partnerships to accelerate timelines, reduce risk,
and lower costs across over $3 billion of planned capital work over
the next five years. We also engage with our suppliers to establish
action plans and commitments towards a Science Based Target
(refer to page 42).
We have a strategic priority to ‘build tomorrow’s workforce today’ to
develop the skills we need to deliver on our ambitions. We continue to
deliver strong entry level programmes for graduates, interns and
apprentices, as well as proactively investing in leadership
development. In 2026, we expanded our Construction Development
Programme to include a Development Engineer Pathway aimed at
individuals looking to re-skill and transition into the network
development space within our Electricity Transmission business, and
we launched Leading @ Grid, a global development programme to
enhance senior leadership capabilities.
We work closely with regulators to get investable frameworks in place
in all our jurisdictions, with the acceptance of the RIIO-T3 regulatory
framework a significant milestone in March 2026. Our upgraded five-
year financial framework provides a clear investor proposition,
including an upgraded EPS.
risks background new.jpg
National Grid plc Annual Report and Accounts 2025/26
65
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Task Force on Climate-related Financial Disclosures (TCFD) cont.
Risk Management
4. Transition Opportunity
Growth of clean generation and
increased demand for electricity, even
in our slowest decarbonising scenarios
Risk/opportunity
Market
Renewable generation projects are reorienting our system
design, with power flowing from new locations across our
networks. Electrification of heat and transport, alongside
growing business electricity demand, such as data centres,
offers significant growth opportunities in the UK and US.
National Grid is well positioned to capitalise on these
opportunities through our central role in connecting new
sources of energy to end users via our networks.
Products and services
The evolution of the energy system will require innovative
solutions to deliver expanded and decarbonised electricity
networks, with National Grid leading the way to scale these
technologies, benefitting our business and consumers.
Business units potentially affected:
All
Asset group(s) potentially affected:
Electrical Distribution and Transmission, NGV Interconnectors
and NGP investment
Timeframe
Likelihood
Measurement indicators:
–Network efficiency and reliability
–Renewable capacity additions
–Proportion of renewables in energy mix
–EU Taxonomy green capital expenditure
–Investment in research and development
–National Grid Partners investment
Potential impact
While the pace and scale of electrification growth is uncertain, the
positive trajectory is clear, driving growth in electricity networks.
In the UK, the Government is supporting continued momentum towards
its Clean Power 2030 Plan. Supply-side objectives are intertwined with
ambition for uptake of decarbonised customer technologies including
electric vehicles, heat pumps, embedded generation and storage. In the
US, our states have established targets for clean energy supply and
consumer electrification. The drive to cleaner energy in our jurisdictions
requires the infrastructure to deliver it, underpinning our new five-year
financial framework with cumulative capital investment of at least £70
billion.
Alongside expanding networks in our jurisdictions, we will need greater
interconnectivity to match intermittent renewable generation to
increased electricity demand.
Our response
To maximise these opportunities, we are delivering on our strategy to
focus on networks and streamlining our business. In May 2025, we
completed the sale of National Grid Renewables, our US onshore
renewables business. In November 2025 we completed the sale of
Grain LNG, our UK LNG asset. Our recently upgraded five-year
financial framework projects capital investment of at least £70 billion
across our energy networks from 2027 to 2031. This investment
continues the Group’s shift towards electric, with latest projections
forecasting over 80% of Group assets will be electric by 2030/31.
In the UK, we are leading the largest overhaul of the electricity grid in
a generation, doubling our investment in UK electricity networks
relative to the previous five years. We expect to invest £31 billion in
the next five years to 2030/31 in UK ET. Ofgem's Final Determination
delivers a price control (running from 1 April 2026 to 31 March 2031)
Short
Medium
Long
that enables networks to invest at the pace and scale needed to
meet the ramp up in power demand, with plans to nearly double the
amount of power that can flow across the country. This will help
Very Low
Low
Moderate
High
Very High
avoid constraint costs and ensure a resilient, clean and future-
proofed network that will be critical to underpinning economic
competitiveness and growth in the UK in the years ahead.
For UK ED, we expect to invest £9 billion in the next five years. We
continue to deliver against our RIIO-ED2 business plan (ED2 price
control period runs from 1 April 2023 to 31 March 2028), to ensure
the readiness of the electricity network to unlock the potential for
customers to electrify further and faster. We’ll continue to engage
customers and stakeholders as we refine and get ready to submit
our RIIO-ED3 business plan to Ofgem in December 2026 for the
ED3 price control period, which will run from 1 April 2028 to
31 March 2033. ED3 will be a critical period in transforming
electricity distribution networks to achieve the UK's climate targets.
In the US, our well-developed energy transition scenarios have enabled
us to submit credible rate case filings outlining the investments needed
to deliver the energy transition. As part of our five-year financial
framework to 2031, we expect to invest around £17 billion and £12
billion in our New York and New England regulated businesses
respectively. In New York, we continue to make significant progress
on the $4 billion Upstate Upgrade programme, to deliver a smarter,
stronger and cleaner energy grid. Our NIMO rate settlement for 2025
to 2028 was approved in August 2025, including investments to
integrate renewables and reduce emissions from gas leaks. In New
England, we secured approval for the cost recovery mechanism for
our nearly $600 million Electric Sector Modernization Plan, balancing
customer affordability with the state’s clean energy objectives. Gas
has a foundational role in Massachusetts’ all-of-the-above energy
strategy. In January 2026, we submitted our rate case filing for
Massachusetts Gas. These activities further enhance our role in
delivering the energy transition, while helping to ensure energy
security and sustainable affordability in the regions we operate in.
Our NGV business has planned capital investment of around £1 billion
out to 2031. NGV is a leader in developing electricity interconnector
projects to connect Great Britain with other European countries. By
enabling cross-border electricity trade, interconnectors can displace
fossil fuel generation in favour of renewable energy, reducing the CO2e
intensity of the energy mix, while generating revenue. Our current
portfolio of six interconnectors provide 7.8 GW of capacity, allowing
us to trade excess power –  including renewable energy generated
from the sun, wind and water – between different countries, and we
estimate that by 2030, 90% of the energy imported via our
interconnectors will be from zero‑carbon sources. We are working
towards expanding our portfolio of interconnectors, including LionLink,
a first-of-its-kind interconnector connecting offshore wind to Great Britain
and the Netherlands’ electricity grids, and GriffinLink, a new
multi-purpose interconnector project in partnership with TenneT
Germany. In the US, NGV continues to develop opportunities, including
its announcement in 2025 that it will install the world’s first 100%
hydrogen fuelled commercial linear generator at Northport power plant.
Our corporate venture capital arm, National Grid Partners, continues
to invest in startups at the intersection of energy and emerging
technology, allowing National Grid to benefit operationally and
strategically as we scale them across our business and industry. Since
its founding in 2018, National Grid Partners has invested more than
$550 million in startups advancing the future of energy; and it recently
committed another $100 million to artificial intelligence startups
supporting a smarter, more resilient grid and boosting energy security.
risks background new.jpg
National Grid plc Annual Report and Accounts 2025/26
66
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Task Force on Climate-related Financial Disclosures (TCFD) cont.
Risk Management
5. Physical Risk
Increased frequency of extreme
weather events and long-term shifts
in global climate patterns
Risk/opportunity
Acute
Our assets are at risk of physical impacts from increased
frequency of extreme weather events such as storms and
flooding, leading to asset damage and operational risks.
Chronic
Our assets are at risk of physical impacts from changing
climate trends in the longer term, including increased frequency
and severity of coastal flooding, high temperatures, extreme
wind, wildfires and low temperature, exposing us to asset
damage and operational risks.
Business units potentially affected:
All
Asset group(s) potentially affected:
Electrical Distribution and Transmission, Gas Distribution
Timeframe
Likelihood
Measurement indicators:
–Network reliability
–Major storm costs
–CCRT outputs
–Research outputs from innovation projects
–EU Taxonomy climate adaptation capital expenditure
Potential impact
Under our US regulatory frameworks, major storm-related costs
become recoverable in future years once deferrable criteria are met. In
2025/26, we incurred deferrable storm costs (net of allowances) which
are eligible for future recovery of £39 million, but this did not exceed our
pre-set $100 million threshold to be excluded from underlying results.
In the prior year, we incurred £87 million of deferrable storm costs (net
of allowances) and consequently these were all excluded from our
reported underlying results. Further details are provided on pages 71
and 73. Cost recovery for other US weather-related events is included
within the base rates set at the outset of each rate filing period.
In the UK, storm costs above predefined thresholds can be recovered
through re-opener mechanisms within our price control frameworks,
allowing adjustments to allowed revenues for severe weather-related
expenditure.
At the end of 2023, Niagara Mohawk Power Corporation (NIMO)
submitted its Climate Change Resilience Plan (CCRP) to the New York
Public Service Commission (NYPSC), assessing the vulnerability of its
electric infrastructure to climate-related risks. The study identified a
capital investment of approximately $243 million in resilience
programmes over a five-year period (2026-2030), with cumulative
investments projected to reach about $566 million by the tenth year
(2026-2035) and $1.39 billion by the twentieth year (2026-2045). The
revenue requirements for these resilience investments are expected to
result in total bill increases of 0.02% in 2025/26 to 0.66% in 2029/30
compared to current rates across all service classes.
Subsequent modifications to the CCRP were submitted in December
Short
Medium
Long
2024 with an updated filing in February 2025. The CCRP programme
timelines and budgets were revised following the NMPC FY26-28 rate
case, with several projects deferred to support customer affordability.
Very Low
Low
Moderate
High
Very High
As a result, the FY26-30 CCRP budget was reduced from $243 million
to $110 million.
Weather-related events are likely to become more frequent in line with
the increasing likelihoods illustrated by the IPCC. Costs are expected to
grow accordingly, including potential rises to insurance premiums to
cover such events, unless climate adaptation is appropriately
implemented.
Our response
Our Group-wide CVA leverages CCRT data analysis to identify
long-term climate hazard risks to our energy infrastructure. We are
utilising our findings to develop tailored climate change adaptation
plans across our business.
In Massachusetts, efforts to produce a climate change resilience
plan commenced in 2025 with collaboration among Massachusetts
utilities and the state’s Office of Climate Science. This plan, due to
state regulators in September 2029, will identify specific mitigation
actions across the state. While this plan is developed, we continue
to address substation flood mitigation concerns at substations where
flooding is identified as a risk. These resiliency projects total $98.5
million and form part of the recently approved MECO rate case. We
also continue to accelerate the installation of Fault Location Isolation
and Restoration (FLISR) schemes to improve reliability and resiliency
during storms across both New York and New England.
In the UK, ED responded to Ofgem’s Sector Specific Methodology
Consultation (SSMC) which included dedicated climate resiliency
questions linked to the ED3 price control framework.
In addition, as part of our UK ET T3 business plan, we submitted
a RIIO-T3 Climate Resilience Strategy as an annex to the main
business plan submission.
We continue to invest in climate adaptation across the Group in
the form of storm hardening and flood defences, with a further
£79 million (2024/25: £57 million) invested in the year. Such
investments should increase our ability to withstand disruptive
events, and improve our organisational capability to reduce the
magnitude and impact from such events.
National Grid plc Annual Report and Accounts 2025/26
67
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Task Force on Climate-related Financial Disclosures (TCFD) cont.
Metrics
and Targets
We disclose our GHG emissions metrics through our
Responsible Business reporting, tracking performance
and material climate change risks and opportunities.
Our approach to setting, reviewing and monitoring
climate‑related targets is embedded in our Climate
change mitigation GPR on page 35, which outlines
how we assess and manage the actual and
potential impacts of climate change. Progress
against each target is monitored using defined
quantitative indicators, with performance reviewed
through established risk management and
governance processes.
Our greenhouse gas (GHG) emission reduction
targets and other climate-related metrics are
summarised on page 68, with performance analysis
(including trends and year‑on‑year movements)
provided in the KPI section on page 27 and the
Responsible Business review on page 40. The
Responsible Business review also includes
additional metrics and targets used by us to assess
and manage relevant climate-related risks and
opportunities. We also disclose industry‑based
metrics relevant to our business model and
activities, and reflected in our SASB‑aligned
reporting on our website which helps inform our
Responsible Business commitments.
Our emissions reduction targets have been
informed by the objectives of the Paris Agreement
and the jurisdictional commitments that flow from
it, recognising that failing to play our role in
delivering emissions reductions would risk
undermining the wider decarbonisation goals of the
jurisdictions in which we operate. We are not
subject to entity‑specific legally mandated GHG
reduction targets beyond regulated mechanisms to
incentivise GHG reductions.
In the US, long‑term policy frameworks such as
New York’s Climate Leadership and Community
Protection Act and Massachusetts’ Clean Energy
and Climate Plan set out pathways to fossil‑free
energy systems by 2050, while in the UK the
Government’s Clean Power 2030 Action Plan
signals an accelerated transition to a decarbonised
power system. These commitments have shaped
the ambition and timing of our targets and reinforce
the importance of engagement with policymakers,
trade associations and industry bodies, where
responsible advocacy for enabling policy
frameworks is critical to delivering both
jurisdictional climate objectives and our net zero
commitment (see page 51).
We continually monitor our climate-related metrics
and targets to ensure that the data we measure is
meaningful, aligns with our strategy, and provides
the necessary information for effective performance
monitoring and progress demonstration. By
integrating these metrics into our financial
Enterprise Performance Management (EPM)
processes, it allows us to assess GHG reduction
performance in the context of wider enterprise
performance. Our annual Strategic Business
Planning cycle includes mechanisms to track
business units' plans against our SBTi glide paths.
Our monitoring and reporting processes
incorporate internal controls and a team of
technical consultants reviewed our CTP publication
for accuracy, consistency and any material
discrepancies. We have been clear that we do not
expect emissions reductions to follow a linear
trajectory and a significant portion of our emissions
are outside our control.
All of our GHG emissions are reported on a gross
basis, and our primary focus is on decarbonising
the business in line with a 1.5°C pathway. We do
not assume the use carbon offsetting to meet our
near‑term science‑based targets; however, we do
use limited carbon offsets to support our emissions
reduction efforts where emissions cannot be
reduced further, in line with SBTi guidance and our
internal carbon offsetting policy. The Group Carbon
Offsetting Policy, revised in 2025 under the
oversight of the Carbon Offsetting Committee,
helps ensures offsetting is used only as a
high‑integrity complement to direct emissions
reductions and requires a balanced portfolio across
carbon reduction and removal projects, locations,
technologies, storage durations, costs and
co‑benefits. All offsetting is governed by robust
principles including additionality, permanence,
transparency, independent verification and effective
risk management to help ensure environmental
integrity and value for National Grid.
Within our UK Electricity Transmission business, we
collaborated with Housing Associations’ Charitable
Trust to purchase around 1,000 Verified Carbon
Standard credits from achieved carbon reductions
delivered through energy efficiency initiatives in
low‑income households, delivering wider social
benefits to local communities. We also partnered
with Forest Carbon to purchase approximately
14,000 UK‑based Pending Issuance Units (PIUs)
from a bespoke portfolio of woodland projects.
These PIUs represent a promise to deliver a tonne
of carbon dioxide equivalent in the future and
support planning for the compensation of
UK‑based emissions, while delivering
environmental co‑benefits. Under the RIIO‑T3
framework, our UK Electricity Transmission
business has Ofgem‑approved funding of £16.17m
to support further carbon compensation over the
regulatory period. This funding is based on an
assumed unit cost of £74 per tCO₂e, capped at
6% of NGET’s business carbon footprint
GHG emissions.
Details of Directors’ remuneration, including the
incorporation of climate‑related considerations into
executive remuneration and the proportion linked
to such considerations in the current period, are
set out in the Directors’ Remuneration Report on
pages 107 – 126.
In addition to the metrics laid out on the following
page, we have disclosed the proportion of IFRS
revenue, operating expenditure and capital
expenditure that align with the principles of the
EU Taxonomy.
A significant proportion of our Scope 1 GHG
emissions are subject to either a traded carbon
price or a regulatory non‑traded cost of carbon.
These carbon prices are primarily applied through
regulatory frameworks rather than as an internal
shadow price for capital allocation. While carbon
pricing has enhanced our understanding of the
emissions implications of our activities, it has not
materially influenced investment decisions to date,
and we do not operate a single, Group-wide
internal carbon price applied uniformly across our
businesses. Carbon pricing is one of several tools
we use alongside policy drivers, regulatory
commitments, and carbon reduction
methodologies, including the application of carbon
weighting in tendering for construction projects.
On the next page we include our GHG emissions
footprint, a key indicator against our climate-related
risks and opportunities.
Metrics and Targets pp67.jpg
National Grid plc Annual Report and Accounts 2025/26
68
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Task Force on Climate-related Financial Disclosures (TCFD) cont.
Metrics and targets
Index of climate-related quantitative measurement indicators1
In the last year our emissions have risen, due to factors outside of our control and despite our efforts to reduce emissions where we have control.
Refer to pages 40 – 44 for further details.
2025/26
2024/25
2023/24
SBTi validated GHG emissions reduction targets
Reduce absolute Scope 1 and 2 GHG emissions by 60% by 20302,3
(3.3)%
(4.4)%
(11.8)%
Reduce absolute Scope 1 and 2 GHG emissions excluding generation by 50% by 20302,3
(26.0)%
(14.7)%
(14.4)%
Reduce the carbon intensity of our power generation (Scope 1 GHG emissions) by 90% by 2030, and by 92% by
20333
2.5%
(36.7)%
(34.7)%
Reduce the carbon intensity of our power generation and sold electricity (Scope 1 and Scope 3 GHG
emissions) by 86% by 20333
(1.2)%
(18.3)%
(15.4)%
Reduce absolute GHG emissions for all Scope 3, excluding sold electricity, by 37.5% by 20334
11.1%
5.8%
0.8%
Reduce absolute GHG emissions from gas sold by third parties by 37.5% by 20334,5
(9.6)%
(10.5)%
(17.6)%
Key climate-related metrics
Scope 1 GHG emissions (ktCO2e)
5,001
4,467
3,988
Scope 2 GHG emissions (ktCO2e, location based)
2,510
2,955
2,864
Total Scope 1 and 2 GHG emissions2 (ktCO2e)
7,511
7,422
6,852
Scope 3 GHG emissions (ktCO2e)
29,503
28,435
27,384
Total Scope 1, 2 and 3 GHG emissions2 (full value chain) (ktCO2e)
37,015
35,857
34,236
Intensity ratio: Scope 1 and 2 GHG emissions per million of revenue2 (tCO2e/£m)
425
427
345
Climate change adaptation capital expenditure (EU Taxonomy aligned activities, £m)
79
57
30
Climate change mitigation capital expenditure (EU Taxonomy aligned activities, £m)
9,756
7,610
5,962
Group energy consumption from fossil fuel generation (GWh)
19,317
17,390
14,375
Group energy consumption from electricity systems line losses (GWh)
15,111
15,514
14,519
Group energy consumption excluding fossil fuel generation and electricity systems line losses (GWh)
1,386
1,916
2,547
Total Group energy consumption (GWh)
35,814
34,820
31,441
UK energy consumption from electricity systems line losses (GWh)
9,702
10,413
10,046
UK energy consumption excluding electricity systems losses (GWh)
276
790
1,297
Total UK energy consumption (GWh)
9,978
11,203
11,343
UK Scope 1 GHG emissions (ktCO2e)
211
278
377
UK Scope 2 GHG emissions2 (ktCO2e)
1,670
2,137
2,113
Total UK Scope 1 and 2 GHG emissions2 (ktCO2e)
1,881
2,415
2,490
1.Refer to our Responsible Business Reporting Methodology
(methodology) on our website for calculation details. Target year
20Yn indicates that the performance will be reported in the
financial year that aligns with the year 20Yn/Yn+1. Our
methodology applies the GHG Protocol operational control
principle across all emissions and environmental metrics.
Operations that are sold or disposed of are excluded from
reporting from the year of exit. For this reporting year, this
includes National Grid Renewables and Grain LNG. Further
details are provided in the “Changes to global operations”
section within our methodology and in Note 1 (Basis of
preparation and recent accounting developments) to the
consolidated financial statements. We report Scope 3 emissions
across six categories within our current SBTi target boundary, as
defined by the GHG Protocol. Our disclosed Scope 3 GHG
emissions include GHG Protocol Scope 3 Categories 1, 2, 3, 5,
6, 7 and 11. Categories not listed are excluded as not material.
2.Includes Scope 2 location-based emissions only as line losses
make up the vast majority of these emissions and we have
limited renewable electricity certificates and other contractual
instruments in place. 2024/25 excludes National Grid ESO.
3.Near-term target approved by Science Based Targets initiative
(SBTi) and aligned to the Paris Agreement and a 1.5°C pathway.
GHG targets are against a financial year 2018/19 baseline.
4.Near-term target approved by SBTi and aligned to a well below
2°C pathway. GHG targets are against a financial year 2018/19
baseline.
5.Third-Party Sold Gas, a US-only emission, are downstream
emissions associated with the combustion of natural gas
delivered through our network but sold by a company other than
National Grid. This differs from Scope 3 Cat. 11 GHG Protocol
guidance, which otherwise advises to consider only the end use
of goods sold by the reporting company itself.
Note: The above data together with our Climate change – Scope 1,
2 and 3 emissions KPIs on page 27 and “Absolute energy
consumption in our flagship offices” on page 42 is responsive to the
UK Government’s Streamlined Energy and Carbon Reporting (SECR)
requirements. We have split out our Group energy consumption into
constituent parts for greater transparency. Fuels consumed for
power generation on behalf of LIPA, the contracting body is shown
separately because energy consumption related to power generation
can vary greatly year-on-year and is determined by LIPA. Amounts
are presented in GWh, with 1 GWh=1,000,000 kWh.
National Grid plc Annual Report and Accounts 2025/26
69
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Financial review
A solid financial return
Making the connection – delivering outputs efficiently and earning a solid financial return.
Revenue
Profit and cash flows
Investment
The vast majority of our revenues are set in accordance with our
regulatory agreements (see pages 220 – 225) and are calculated
based on a number of factors, including investment in network assets,
performance on incentives, allowed returns on equity and cost of
debt, and customer satisfaction.
Our ability to convert revenue to profit and cash is important. By managing
our operations efficiently, safely and for the long term, we generate substantial
operating cash flows. Coupled with long-term debt financing, as well as
additional capital generated through the Rights Issue and take-up of the
shareholder scrip dividend option during periods of higher investment,
we are able to invest in growing our asset base and fund our dividends.
We invest efficiently in our networks to achieve strong and sustainable
growth in our regulated asset base over the long term. We also invest
in assets in our non-regulated businesses. We continually assess, monitor
and challenge investment decisions so we can continue to run safe, reliable
and cost-effective networks.
Statutory revenue (%)
Statutory operating profit (%)
Capital investment (%)
Underlying net revenue1 (%)
Underlying operating profit1 (%)
Total assets (used for asset growth) (%)
50
106
174
ò
UK Electricity Transmission (UK ET)
16%
ò
UK Electricity Distribution (UK ED)
11%
ò
New York
43%
ò
New England
23%
ò
National Grid Ventures (NGV)
6%
ò
Other activities
1%
ò
UK Electricity Transmission (UK ET)
30%
ò
UK Electricity Distribution (UK ED)
21%
ò
New York
22%
ò
New England
17%
ò
National Grid Ventures (NGV)
13%
ò
Other activities
(3)%
ò
UK Electricity Transmission (UK ET)
38%
ò
UK Electricity Distribution (UK ED)
14%
ò
New York
30%
ò
New England
17%
ò
National Grid Ventures (NGV)
1%
ò
Other activities
—%
£17.7bn
£5.4bn
£11.6bn
78
134
162
ò
UK Electricity Transmission (UK ET)
20%
ò
UK Electricity Distribution (UK ED)
14%
ò
New York
38%
ò
New England
20%
ò
National Grid Ventures (NGV)
8%
ò
Other activities
—%
ò
UK Electricity Transmission (UK ET)
30%
ò
UK Electricity Distribution (UK ED)
22%
ò
New York
30%
ò
New England
15%
ò
National Grid Ventures (NGV)
6%
ò
Other activities
(3)%
ò
UK Electricity Transmission (UK ET)
34%
ò
UK Electricity Distribution (UK ED)
18%
ò
New York
27%
ò
New England
14%
ò
National Grid Ventures (NGV)
4%
ò
Other activities
3%
£13.2bn
£5.7bn
£72.0bn
1.Non-GAAP alternative performance measures (APMs). For further details and reconciliation to equivalent GAAP measures see Other unaudited financial information on pages 236 – 247.
National Grid plc Annual Report and Accounts 2025/26
70
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Financial review cont.
Summary of Group financial
performance for the year
ended 31 March 2026
Statutory EPS1
65.5p
2024/25
2023/24
366
Underlying EPS1
78.0p
2024/25
2023/24
370
Group RoE
9.8%
2024/25
2023/24
375
Asset growth
10.9%
2024/25
2023/24
379
1.From continuing operations.
Financial summary for continuing operations
£m 
2025/26
2024/25
Change
Accounting profit
 
 
Gross revenue
17,687
18,378
(4)%
Other operating income
489
—
n/m
Operating costs
(12,745)
(13,444)
5%
Statutory operating profit
5,431
4,934
10%
Net finance costs
(1,325)
(1,357)
2%
Share of joint ventures and associates
76
73
4%
Tax
(939)
(821)
(14)%
Non-controlling interest
(2)
(3)
33%
Statutory earnings
3,241
2,826
15%
Exceptional items and remeasurements1
(333)
(171)
n/m
Tax on exceptional items and remeasurements1
(16)
(40)
60%
Adjusted earnings1
2,892
2,615
11%
Timing and major storm costs1
636
592
n/m
Tax on timing and major storm costs1
(168)
(156)
n/m
Deferred tax on underlying profits in NGET and NGED1
499
401
24%
Underlying earnings1
3,859
3,452
12%
Statutory EPS
65.5p
60.0p
9%
Adjusted EPS1
58.5p
55.6p
5%
Underlying EPS1
78.0p
73.3p
6%
Dividend per share1
48.49p
46.72p
3.8%
Dividend cover – underlying1
1.6x
1.6x
3%
Economic profit
Group financial performance after interest and tax (Group RoE numerator)1
2,866
2,602
10%
Group RoE1
9.8%
9.0%
80bps
Capital investment and asset growth
Capital investment
11,576
9,847
18%
Regulated asset growth1
11.7%
10.5%
120bps
Asset growth1
10.9%
9.0%
190bps
Balance sheet strength
FFO/adjusted net debt1
13.0%
13.7%
-70bps
RCF/adjusted net debt1
9.3%
9.8%
-50bps
Net debt (note 29 to the financial statements)
44,160
41,371
7%
Add: held for sale net debt
—
(55)
n/m
Net debt (including held for sale)1
44,160
41,316
7%
Group regulatory gearing1
61%
61%
0bps
1.Non-GAAP alternative performance
measures (APMs) and/or regulatory
performance measures (RPMs).
For further details see Other
unaudited financial information
on pages 236 – 247.
National Grid plc Annual Report and Accounts 2025/26
71
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Financial review cont.
Performance management framework
In managing the business, we focus on various non-IFRS alternative performance measures (APMs) and
regulatory performance measures (RPMs) which provide meaningful comparisons of performance between
years, monitor the strength of the Group’s balance sheet and ensure profitability reflects the Group’s
regulatory economic arrangements. Such APMs and RPMs are supplementary to, and should not be
regarded as a substitute for IFRS measures, which we refer to as statutory results.
Our business performance as set out in our regulatory agreements can differ from accounting under
IFRS, principally because our regulators allow for regulatory deferral accounting. Our allowed revenues
are set in accordance with our regulatory price controls or rate plans. Statutory IFRS does not allow us
to recognise regulatory assets or liabilities (for the difference between collected and allowed regulatory
revenues). As a result we use a suite of APMs (defined by us) to help measure and monitor our underlying
regulated business performance. We explain the basis of these measures and, where practicable,
reconcile these to statutory IFRS results (i.e. GAAP) in Other unaudited financial information on pages
236 – 247. Our RPMs have been calculated for the total Group (or individual entities where relevant)
and these are not based on IFRS measures. Specifically, we measure the financial performance of the
Group from different perspectives:
–Accounting profit: In addition to statutory IFRS measures we report adjusted results (i.e. before
exceptional items and remeasurements), and underlying results, which further take account of:
i) volumetric and other revenue timing differences arising from our regulatory contracts; (ii) major storm
costs (net of in-year allowances and deductibles) which are recoverable in future periods when they
exceed a $100 million threshold; and (iii) deferred tax in our UK regulated businesses (NGET and
NGED). In doing so, we intend to make the impact of such items clear to users of the financial
information in this Annual Report.
–Economic profit: Group Return on Equity (RoE) takes account of the regulated value of our assets
and of our regulatory economic arrangements to show the returns on shareholder equity.
–Capital investment and asset growth: Capital investment comprises our additions to PP&E and
intangible assets (excluding acquisitions), equity investments in joint ventures and associates, along
with net movements in capex prepayments. Asset growth represents the year-on-year increase in
RAV and US rate base in our regulated businesses (referred to as ‘regulated asset growth’), plus
the increase in net assets (excluding certain balances such as pensions, net debt and deferred taxes)
in our non-regulated businesses, but excluding the impact of currency movements.
–Balance sheet strength: Maintaining a strong investment grade credit rating allows us to finance
our growth ambitions at a competitive rate. Hence, we monitor credit metrics used by the major rating
agencies to ensure we are generating sufficient cash flow to service our debts. Group regulatory
gearing measures our Group net debt as a proportion of the Group’s assets that are used to measure
asset growth. This includes balances for businesses classified as held for sale under IFRS.
This balanced range of measures of financial wellbeing informs our dividend policy which aims to grow
annual DPS in line with UK CPIH, thus maintaining the DPS in real terms.
Financial summary for continuing operations
Accounting profit: Statutory IFRS earnings were £3,241 million in 2025/26, £415 million (15%)
higher than the prior year. Statutory earnings benefited from pre-tax net exceptional gains of £376 million
related to the sale of our two businesses (Grain LNG and National Grid Renewables) in 2025/26; and pre-
tax remeasurement losses of £43 million (2025: pre-tax net exceptional credits of £42 million and pre-tax
remeasurement gains of £129 million). For details on exceptional items, refer to note 5 to the financial
statements. Timing swings were £131 million adverse year-on-year, with a £636 million net under-
recovery in 2025/26 (2025: £505 million net under-recovery). These factors, the net impact of tax on these
items and an improvement in underlying business performance meant that statutory EPS for continuing
operations of 65.5p was 5.5p higher than the prior year.
Our ‘adjusted’ results exclude the impacts from exceptional items and remeasurements as explained
on page 155. In 2025/26, adjusted earnings from continuing operations were £2,892 million, up
£277 million (11%) from the prior year. Adjusted earnings in 2025/26 included a timing net under-recovery
after tax of £468 million (2025: £372 million net under-recovery). As a result, adjusted operating profit of
£5,044 million was up £279 million (2025: £4,765 million). Adjusted net finance costs of £1,271 million
were £90 million lower, as a result of higher average net debt and higher interest rates being more than
offset by higher capitalised interest and other interest income. Share of profits from joint ventures and
associates of £76 million were broadly flat year-on-year. Adjusted tax of £955 million was £94 million
higher, driven by the increase in profits, but resulted in a stable effective tax rate of 25.3% (2025: 25.3%).
Our policy is to exclude deferrable storm costs (net of allowances and deductibles) from underlying results if
these exceed a $100 million aggregate pre-tax threshold. In 2024/25, we included $110 million (£87 million)
of storm costs in our adjusted results, but excluded these from underlying results. In 2025/26, our
allowances were higher and deferrable storm costs were below this threshold, so $52 million (£39 million)
of deferrable storm costs that are recoverable in future periods are included in our underlying results.
Underlying operating profit was up 6% driven by improved performance in New York (from updated rates
and the collection of unremunerated costs in prior periods) along with higher allowed revenues in UK
Electricity Transmission (RAV growth and increased ASTI-related ‘fast money’). New England was lower
with updated rates and capital trackers being more than offset by a FERC order on Transmission Owner
RoEs across New England (mostly related to historical years). National Grid Ventures was lower mainly
as a result of the sale of two businesses in the year (Grain LNG and National Grid Renewables). Other
activities and the contribution from joint ventures and associates were broadly flat year-on-year. Regulated
controllable costs were 2% higher (at constant currency), with inflation and workload increases being
partly offset by efficiency savings. Depreciation and amortisation were higher than the prior year due to
our growing asset base. Net debt-related financing costs were higher, driven by our ongoing investment
programme. Other interest was favourable year-on-year driven by higher levels of capitalised interest.
After accounting for non-controlling interests, underlying earnings increased by 12% and resulted in
a 6% increase in underlying EPS to 78.0p.
Economic profit: Our Group RoE for 2025/26 was 9.8%, 80bps higher than the 9.0% achieved in the
prior year, with the numerator increasing by £264 million, (up 10% year-on-year), primarily driven by higher
regulatory business performance, compared with an increase in the denominator of £49 million (up 0.2%
year-on-year), which includes the beneficial impact of asset growth being partly funded by higher gearing.
Capital investment and asset growth: Capital investment of £11,576 million was £1,729 million
(18%) higher than 2024/25, driven by a step up in investment across our regulated businesses, partly
offset by lower investment in National Grid Ventures. Higher capital investment and the impact of RAV
indexation have helped deliver asset growth of 10.9% (2025: 9.0%).
Balance sheet strength: Net debt increased from £41.4 billion at March 2025 to £44.2 billion at
March 2026. Operating cash inflows of £7.8 billion (2025: £6.8 billion) along with disposal proceeds
from the sales of NG Renewables £1.5 billion and Grain LNG £1.3 billion helped to fund £10.6 billion
(2025: £9.7 billion) of investing cash outflows. Regulatory gearing was maintained at 61% (2025: 61%)
and our calculation of RCF/adjusted net debt credit metric was 9.3%, a decrease of -50bps compared
with 2024/25 and remains above the current rating threshold of 7.0%.
National Grid plc Annual Report and Accounts 2025/26
72
Strategic Report
Corporate Governance
Financial Statements
Additional Information
Financial review cont.
Dividend
The recommended full-year dividend per ordinary share of 48.49p is in line with our policy of increasing the prior year dividend in line with UK CPIH inflation and is covered 1.6 times by underlying EPS.
Profitability and earnings
In calculating adjusted profit measures, where we consider it is in the interests of users of the financial statements to do so, we exclude certain discrete items of income or expense that we consider to be exceptional