XML 99 R55.htm IDEA: XBRL DOCUMENT v3.22.0.1
CONTINGENCIES, COMMITMENTS, AND GUARANTEES
12 Months Ended
Dec. 31, 2021
Commitments and Contingencies Disclosure [Abstract]  
CONTINGENCIES, COMMITMENTS, AND GUARANTEES CONTINGENCIES, COMMITMENTS, AND GUARANTEES
General Litigation Matters
The Registrants are involved in various matters being litigated and regulatory matters. The ultimate outcome of such pending or potential litigation or regulatory matters against each Registrant and any subsidiaries cannot be determined at this time; however, for current proceedings not specifically reported herein, management does not anticipate that the ultimate liabilities, if any, arising from such current proceedings would have a material effect on such Registrant's financial statements.
The Registrants believe the pending legal challenges discussed below have no merit; however, the ultimate outcome of these matters cannot be determined at this time.
Southern Company
In February 2017, Jean Vineyard and Judy Mesirov each filed a shareholder derivative lawsuit in the U.S. District Court for the Northern District of Georgia. Each of these lawsuits names as defendants Southern Company, certain of its directors, certain of its current and former officers, and certain former Mississippi Power officers. In 2017, these two shareholder derivative lawsuits were consolidated in the U.S. District Court for the Northern District of Georgia. The complaints allege that the defendants caused Southern Company to make false or misleading statements regarding the Kemper County energy facility cost and schedule. Further, the complaints allege that the defendants were unjustly enriched and caused the waste of corporate assets and also allege that the individual defendants violated their fiduciary duties.
In May 2017, Helen E. Piper Survivor's Trust filed a shareholder derivative lawsuit in the Superior Court of Gwinnett County, Georgia that names as defendants Southern Company, certain of its directors, certain of its current and former officers, and certain former Mississippi Power officers. The complaint alleges that the individual defendants, among other things, breached their fiduciary duties in connection with schedule delays and cost overruns associated with the construction of the Kemper County energy facility. The complaint further alleges that the individual defendants authorized or failed to correct false and misleading statements regarding the Kemper County energy facility schedule and cost and failed to implement necessary internal controls to prevent harm to Southern Company. In August 2019, the court granted a motion filed by the plaintiff in July 2019 to substitute a new named plaintiff, Martin J. Kobuck, in place of Helen E. Piper Survivor's Trust.
The plaintiffs in each of these cases seek to recover, on behalf of Southern Company, unspecified actual damages and, on each plaintiff's own behalf, attorneys' fees and costs in bringing the lawsuit. The plaintiffs also seek certain changes to Southern Company's corporate governance and internal processes. On January 21, 2022, the plaintiffs in the federal court action filed a motion for preliminary approval of settlement, together with an executed stipulation of settlement, which applies to both the federal and state actions. The terms of the settlement are not expected to have a material impact on Southern Company's financial statements.
Georgia Power
In 2011, plaintiffs filed a putative class action against Georgia Power in the Superior Court of Fulton County, Georgia alleging that Georgia Power's collection in rates of amounts for municipal franchise fees (which fees are paid to municipalities) exceeded the amounts allowed in orders of the Georgia PSC and alleging certain state law claims. This case has been ruled upon and appealed numerous times over the last several years. In October 2019, the Georgia PSC issued an order that found Georgia Power
has appropriately implemented the municipal franchise fee schedule. On March 16, 2021, the Superior Court of Fulton County granted class certification and Georgia Power's motion for summary judgment. On March 22, 2021, the plaintiffs filed a notice of appeal, and, on April 2, 2021, Georgia Power filed a notice of cross appeal on the issue of class certification. On December 1, 2021, the Georgia Court of Appeals affirmed the Superior Court's ruling that granted summary judgment to Georgia Power and dismissed Georgia Power's cross appeal on the issue of class certification as moot. On December 21, 2021, the plaintiffs filed a petition for writ of certiorari to the Georgia Supreme Court. The amount of any possible losses cannot be estimated at this time because, among other factors, it is unknown whether any losses would be subject to recovery from any municipalities.
In July 2020, a group of individual plaintiffs filed a complaint in the Superior Court of Fulton County, Georgia against Georgia Power alleging that releases from Plant Scherer have impacted groundwater, surface water, and air, resulting in alleged personal injuries and property damage. The plaintiffs seek an unspecified amount of monetary damages including punitive damages, a medical monitoring fund, and injunctive relief. Georgia Power has filed multiple motions to dismiss the complaint. On October 8, 2021, three additional complaints were filed in the Superior Court of Monroe County, Georgia against Georgia Power alleging that releases from Plant Scherer have impacted groundwater and air, resulting in alleged personal injuries and property damage. The plaintiffs seek an unspecified amount of monetary damages including punitive damages. On November 11, 2021, Georgia Power filed a notice to remove the three cases pending in the Superior Court of Monroe County to the U.S. District Court in the Middle District of Georgia. On February 7, 2022, four additional complaints were filed in the Superior Court of Monroe County, Georgia against Georgia Power seeking damages for alleged personal injuries or property damage. The amount of any possible losses from these matters cannot be estimated at this time.
Mississippi Power
In 2018, Ray C. Turnage and 10 other individual plaintiffs filed a putative class action complaint against Mississippi Power and the three then-serving members of the Mississippi PSC in the U.S. District Court for the Southern District of Mississippi, which was amended in March 2019 to include four additional plaintiffs. Mississippi Power received Mississippi PSC approval in 2013 to charge a mirror CWIP rate premised upon including in its rate base pre-construction and construction costs for the Kemper IGCC prior to placing the Kemper IGCC into service. The Mississippi Supreme Court reversed that approval and ordered Mississippi Power to refund the amounts paid by customers under the previously-approved mirror CWIP rate. The plaintiffs allege that the initial approval process, and the amount approved, were improper and make claims for gross negligence, reckless conduct, and intentional wrongdoing. They also allege that Mississippi Power underpaid customers by up to $23.5 million in the refund process by applying an incorrect interest rate. The plaintiffs seek to recover, on behalf of themselves and their putative class, actual damages, punitive damages, pre-judgment interest, post-judgment interest, attorney's fees, and costs. The district court dismissed the amended complaint; however, in March 2020, the plaintiffs filed a motion seeking to name the new members of the Mississippi PSC, the Mississippi Development Authority, and Southern Company as additional defendants and add a cause of action against all defendants based on a dormant commerce clause theory under the U.S. Constitution. In July 2020, the plaintiffs filed a motion for leave to file a third amended complaint, which included the same federal claims as the proposed second amended complaint, as well as several additional state law claims based on the allegation that Mississippi Power failed to disclose the annual percentage rate of interest applicable to refunds. In November 2020, the court denied each of the plaintiffs' pending motions and entered final judgment in favor of Mississippi Power. On January 22, 2021, the court denied further motions by the plaintiffs to vacate the judgment and to file a revised second amended complaint. On February 19, 2021, the plaintiffs filed a notice of appeal with the U.S. Court of Appeals for the Fifth Circuit. An adverse outcome in this proceeding could have a material impact on Mississippi Power's financial statements.
Environmental Remediation
The Southern Company system must comply with environmental laws and regulations governing the handling and disposal of waste and releases of hazardous substances. Under these various laws and regulations, the Southern Company system could incur substantial costs to clean up affected sites. The traditional electric operating companies and the natural gas distribution utilities conduct studies to determine the extent of any required cleanup and have recognized the estimated costs to clean up known impacted sites in the financial statements. A liability for environmental remediation costs is recognized only when a loss is determined to be probable and reasonably estimable and is reduced as expenditures are incurred. The traditional electric operating companies and the natural gas distribution utilities in Illinois and Georgia have each received authority from their respective state PSCs or other applicable state regulatory agencies to recover approved environmental remediation costs through regulatory mechanisms. Any difference between the liabilities accrued and costs recovered through rates is deferred as a regulatory asset or liability. These regulatory mechanisms are adjusted annually or as necessary within limits approved by the state PSCs or other applicable state regulatory agencies.
Georgia Power has been designated or identified as a potentially responsible party at sites governed by the Georgia Hazardous Site Response Act and/or by the federal Comprehensive Environmental Response, Compensation, and Liability Act, and assessment and potential cleanup of such sites is expected. For 2021, 2020, and 2019, Georgia Power recovered approximately $12 million, $12 million, and $2 million, respectively, through the ECCR tariff for environmental remediation.
Southern Company Gas is subject to environmental remediation liabilities associated with 40 former MGP sites in four different states. Southern Company Gas' accrued environmental remediation liability at December 31, 2021 and 2020 was based on the estimated cost of environmental investigation and remediation associated with these sites.
At December 31, 2021 and 2020, the environmental remediation liability and the balance of under recovered environmental remediation costs were reflected in the balance sheets of Southern Company, Georgia Power, and Southern Company Gas as shown in the table below. At December 31, 2021 and 2020, Alabama Power did not have environmental remediation liabilities and Mississippi Power's balance was immaterial.
Southern CompanyGeorgia
Power
Southern Company Gas
(in millions)
December 31, 2021:
Environmental remediation liability:
Other current liabilities$69 $17 $52 
Accrued environmental remediation197 — 197 
Under recovered environmental remediation costs:
Other regulatory assets, current$71 $12 $59 
Other regulatory assets, deferred231 23 208 
December 31, 2020:
Environmental remediation liability:
Other current liabilities$44 $15 $29 
Accrued environmental remediation216 — 216 
Under recovered environmental remediation costs:
Other regulatory assets, current$46 $12 $34 
Other regulatory assets, deferred265 29 236 
The ultimate outcome of these matters cannot be determined at this time; however, as a result of the regulatory treatment for environmental remediation expenses described above, the final disposition of these matters is not expected to have a material impact on the financial statements of the applicable Registrants.
Nuclear Fuel Disposal Costs
Acting through the DOE and pursuant to the Nuclear Waste Policy Act of 1982, the U.S. government entered into contracts with Alabama Power and Georgia Power that required the DOE to dispose of spent nuclear fuel generated at Plants Farley, Hatch, and Vogtle Units 1 and 2 beginning no later than January 31, 1998. The DOE has yet to commence the performance of its contractual and statutory obligation to dispose of spent nuclear fuel. Consequently, Alabama Power and Georgia Power pursued and continue to pursue legal remedies against the U.S. government for its partial breach of contract.
In 2014, Alabama Power and Georgia Power filed lawsuits against the U.S. government for the costs of continuing to store spent nuclear fuel at Plants Farley, Hatch, and Vogtle Units 1 and 2 for the period from January 1, 2011 through December 31, 2013. The damage period was subsequently extended to December 31, 2014. In 2019, the Court of Federal Claims granted Alabama Power's and Georgia Power's motion for summary judgment on damages not disputed by the U.S. government, awarding those undisputed damages to Alabama Power and Georgia Power. However, those undisputed damages are not collectible until the court enters final judgment on the remaining damages.
In 2017, Alabama Power and Georgia Power filed additional lawsuits against the U.S. government in the Court of Federal Claims for the costs of continuing to store spent nuclear fuel at Plants Farley, Hatch, and Vogtle Units 1 and 2 for the period from January
1, 2015 through December 31, 2017. In August 2020, Alabama Power and Georgia Power filed amended complaints in each of the lawsuits adding damages from January 1, 2018 to December 31, 2019 to the claim period.
The outstanding claims for the period January 1, 2011 through December 31, 2019 total $110 million and $132 million for Alabama Power and Georgia Power (based on its ownership interests), respectively. Damages will continue to accumulate until the issue is resolved, the U.S. government disposes of Alabama Power's and Georgia Power's spent nuclear fuel pursuant to its contractual obligations, or alternative storage is otherwise provided. No amounts have been recognized in the financial statements as of December 31, 2021 for any potential recoveries from the pending lawsuits.
The final outcome of these matters cannot be determined at this time. However, Alabama Power and Georgia Power expect to credit any recoveries for the benefit of customers in accordance with direction from their respective PSC; therefore, no material impact on Southern Company's, Alabama Power's, or Georgia Power's net income is expected.
On-site dry spent fuel storage facilities are operational at all three plants and can be expanded to accommodate spent fuel through the expected life of each plant.
Nuclear Insurance
Under the Price-Anderson Amendments Act (Act), Alabama Power and Georgia Power maintain agreements of indemnity with the NRC that, together with private insurance, cover third-party liability arising from any nuclear incident occurring at the companies' nuclear power plants. The Act provides funds up to $13.5 billion for public liability claims that could arise from a single nuclear incident. Each nuclear plant is insured against this liability to a maximum of $450 million by American Nuclear Insurers (ANI), with the remaining coverage provided by a mandatory program of deferred premiums that could be assessed, after a nuclear incident, against all owners of commercial nuclear reactors. A company could be assessed up to $138 million per incident for each licensed reactor it operates but not more than an aggregate of $20 million per incident to be paid in a calendar year for each reactor. Such maximum assessment, excluding any applicable state premium taxes, for Alabama Power and Georgia Power, based on its ownership and buyback interests in all licensed reactors, is $275 million and $267 million, respectively, per incident, but not more than an aggregate of $41 million and $40 million, respectively, to be paid for each incident in any one year. Both the maximum assessment per reactor and the maximum yearly assessment are adjusted for inflation at least every five years. The next scheduled adjustment is due no later than November 1, 2023. See Note 5 under "Joint Ownership Agreements" for additional information on joint ownership agreements.
Alabama Power and Georgia Power are members of Nuclear Electric Insurance Limited (NEIL), a mutual insurer established to provide property damage insurance in an amount up to $1.5 billion for members' operating nuclear generating facilities. Additionally, both companies have NEIL policies that currently provide decontamination, excess property insurance, and premature decommissioning coverage up to $1.25 billion for nuclear losses and policies providing coverage up to $750 million for non-nuclear losses in excess of the $1.5 billion primary coverage.
NEIL also covers the additional costs that would be incurred in obtaining replacement power during a prolonged accidental outage at a member's nuclear plant. Members can purchase this coverage, subject to a deductible waiting period of up to 26 weeks, with a maximum per occurrence per unit limit of $490 million. After the deductible period, weekly indemnity payments would be received until either the unit is operational or until the limit is exhausted. Alabama Power and Georgia Power each purchase limits based on the projected full cost of replacement power, subject to ownership limitations, and have each elected a 12-week deductible waiting period for each nuclear plant.
A builders' risk property insurance policy has been purchased from NEIL for the construction of Plant Vogtle Units 3 and 4. This policy provides the Vogtle Owners up to $2.75 billion for accidental property damage occurring during construction.
Under each of the NEIL policies, members are subject to assessments each year if losses exceed the accumulated funds available to the insurer. The maximum annual assessments for Alabama Power and Georgia Power as of December 31, 2021 under the NEIL policies would be $52 million and $83 million, respectively.
Claims resulting from terrorist acts and cyber events are covered under both the ANI and NEIL policies (subject to normal policy limits). The maximum aggregate that NEIL will pay for all claims resulting from terrorist acts and cyber events in any 12-month period is $3.2 billion each, plus such additional amounts NEIL can recover through reinsurance, indemnity, or other sources.
For all on-site property damage insurance policies for commercial nuclear power plants, the NRC requires that the proceeds of such policies shall be dedicated first for the sole purpose of placing the reactor in a safe and stable condition after an accident. Any remaining proceeds are to be applied next toward the costs of decontamination and debris removal operations ordered by the NRC, and any further remaining proceeds are to be paid either to the applicable company or to its debt trustees as may be appropriate under the policies and applicable trust indentures. In the event of a loss, the amount of insurance available might not be adequate to cover property damage and other expenses incurred. Uninsured losses and other expenses, to the extent not
recovered from customers, would be borne by Alabama Power or Georgia Power, as applicable, and could have a material effect on Southern Company's, Alabama Power's, and Georgia Power's financial condition and results of operations.All retrospective assessments, whether generated for liability, property, or replacement power, may be subject to applicable state premium taxesOther Matters
Mississippi Power
Kemper County Energy Facility
In 2019, 2020, and 2021, Mississippi Power recorded charges to income associated with abandonment and related closure costs and ongoing period costs, net of salvage proceeds, for the mine and gasifier-related assets at the Kemper County energy facility. These charges, including related tax impacts, totaled $24 million pre-tax and after tax in 2019, $4 million pre-tax ($3 million after tax) in 2020, and $11 million pre-tax ($8 million after tax) in 2021. The pre-tax charges are included in other operations and maintenance expenses on the statements of income.
Dismantlement of the abandoned gasifier-related assets and site restoration activities are expected to be completed by 2026. Additional pre-tax period costs associated with dismantlement and site restoration activities, including related costs for compliance and safety, ARO accretion, and property taxes, net of salvage, are estimated to total $10 million to $20 million annually through 2025.
Mississippi Power owns the lignite mine located around the Kemper County energy facility site. As a result of the abandonment of the Kemper IGCC, final mine reclamation began in 2018 and was substantially completed in 2020, with monitoring expected to continue through 2028.
As the mining permit holder, Liberty Fuels Company, LLC, a wholly-owned subsidiary of The North American Coal Corporation, has a legal obligation to perform mine reclamation and Mississippi Power has a contractual obligation to fund all reclamation activities. See Note 6 for additional information.
In 2010, the DOE, through a cooperative agreement with SCS, agreed to fund $270 million of the Kemper County energy facility through the grants awarded to the project by the DOE under the Clean Coal Power Initiative Round 2. In 2016, additional DOE grants in the amount of $137 million were awarded to the Kemper County energy facility. In 2018, Mississippi Power filed with the DOE its request for property closeout certification under the contract related to the $387 million of total grants received. In September 2020, Mississippi Power and Southern Company executed an agreement with the DOE completing Mississippi Power's request, which enabled Mississippi Power to proceed with full dismantlement of the abandoned gasifier-related assets and site restoration activities. The expected impact of the closeout agreement was accrued in 2019. In connection with the DOE closeout discussions, in 2019, the Civil Division of the Department of Justice informed Southern Company and Mississippi Power of an investigation related to the grants received. The ultimate outcome of this matter cannot be determined at this time; however, it could have a material impact on Southern Company's and Mississippi Power's financial statements.
Plant Daniel
In conjunction with Southern Company's sale of Gulf Power, NextEra Energy held back $75 million of the purchase price pending Mississippi Power and Gulf Power negotiating a mutually acceptable revised operating agreement for Plant Daniel. In addition, Mississippi Power and Gulf Power agreed to seek a restructuring of their 50% undivided ownership interests in the Plant Daniel coal units such that each of them would, after the restructuring, own 100% of a generating unit. In 2019, Gulf Power provided notice to Mississippi Power that Gulf Power will retire its share of the coal generating capacity of Plant Daniel on January 15, 2024. Mississippi Power has the option to purchase Gulf Power's ownership interest for $1 on January 15, 2024, provided that Mississippi Power exercises the option no later than 120 days prior to that date. Mississippi Power is assessing the potential operational and economic effects of Gulf Power's notice. Mississippi Power and Gulf Power are continuing negotiations on a mutually acceptable revised operating agreement. The impacts of operating the units on an individual basis continue to be evaluated by Mississippi Power and any transfer of ownership would be subject to approval by the FERC and the Mississippi PSC. The ultimate outcome of this matter cannot be determined at this time. See Note 2 under "Mississippi Power – Integrated Resource Plan" for additional information on Plant Daniel and Note 15 under "Southern Company" for information regarding the sale of Gulf Power.
Commitments
To supply a portion of the fuel requirements of the Southern Company system's electric generating plants, the Southern Company system has entered into various long-term commitments not recognized on the balance sheets for the procurement and delivery of
fossil fuel and, for Alabama Power and Georgia Power, nuclear fuel. The majority of the Registrants' fuel expense for the periods presented was purchased under long-term commitments. Each Registrant expects that a substantial amount of its future fuel needs will continue to be purchased under long-term commitments.
Georgia Power has commitments, in the form of capacity purchases, regarding a portion of a 5% interest in the original cost of Plant Vogtle Units 1 and 2 owned by MEAG Power that are in effect until the later of the retirement of the plant or the latest stated maturity date of MEAG Power's bonds issued to finance such ownership interest. The payments for capacity are required whether or not any capacity is available. Portions of the capacity payments made to MEAG Power for its Plant Vogtle Units 1 and 2 investment relate to costs in excess of Georgia Power's allowed investment for ratemaking purposes. The present value of these portions at the time of the disallowance was written off. Generally, the cost of such capacity is included in purchased power in Southern Company's statements of income and in purchased power, non-affiliates in Georgia Power's statements of income. Georgia Power's capacity payments related to this commitment totaled $6 million, $5 million, and $6 million in 2021, 2020, and 2019, respectively. At December 31, 2021, Georgia Power's estimated long-term obligations related to this commitment totaled $42 million, consisting of $4 million for 2022, $3 million annually for 2023 through 2025, $1 million for 2026, and $28 million thereafter.
See Note 9 for information regarding PPAs accounted for as leases.
Southern Company Gas has commitments for pipeline charges, storage capacity, and gas supply, including charges recoverable through natural gas cost recovery mechanisms or, alternatively, billed to marketers selling retail natural gas. Gas supply commitments include amounts for gas commodity purchases associated with Nicor Gas and SouthStar of 56 million mmBtu at floating gas prices calculated using forward natural gas prices at December 31, 2021 and valued at $222 million. Southern Company Gas provides guarantees to certain gas suppliers for certain of its subsidiaries in support of payment obligations. Southern Company Gas' expected future contractual obligations for pipeline charges, storage capacity, and gas supply that are not recognized on the balance sheets at December 31, 2021 were as follows:
Pipeline Charges, Storage Capacity, and Gas Supply
(in millions)
2022$634 
2023455 
2024376 
2025275 
2026164 
Thereafter910 
Total $2,814 
Guarantees
SCS may enter into various types of wholesale energy and natural gas contracts acting as an agent for the traditional electric operating companies and Southern Power. Under these agreements, each of the traditional electric operating companies and Southern Power may be jointly and severally liable. Accordingly, Southern Company has entered into keep-well agreements with each of the traditional electric operating companies to ensure they will not subsidize or be responsible for any costs, losses, liabilities, or damages resulting from the inclusion of Southern Power as a contracting party under these agreements.
Alabama Power has guaranteed a $100 million principal amount long-term bank loan SEGCO entered into in 2018 and subsequently extended in 2021. Georgia Power has agreed to reimburse Alabama Power for the portion of such obligation corresponding to Georgia Power's proportionate ownership of SEGCO's stock if Alabama Power is called upon to make such payment under its guarantee. At December 31, 2021, the capitalization of SEGCO consisted of $82 million of equity and $100 million of long-term debt that matures in November 2024, on which the annual interest requirement is derived from a variable rate index. In addition, SEGCO had short-term debt outstanding of $20 million. See Note 7 under "SEGCO" for additional information.
As discussed in Note 9, Alabama Power and Georgia Power have entered into certain residual value guarantees related to railcar leases.