Infrastructure Statement
2011-12
(NSW LOGO)
Budget Paper No. 4

 


 

Table of Contents
     
Chapter 1: Infrastructure Overview
   
 
   
1.1 Introduction
  1 - 1
1.2 Infrastructure Investment Overview
  1 - 2
1.3 Value of the State’s Physical Assets
  1 - 12
1.4 Infrastructure Maintenance
  1 - 18
 
   
Chapter 2: Infrastructure Policies and Strategies
   
 
   
2.1 Introduction
  2 - 1
2.2 Infrastructure NSW
  2 - 1
2.3 Infrastructure Planning
  2 - 2
2.4 Infrastructure Procurement
  2 - 6
 
   
Chapter 3: Infrastructure and Service Delivery
   
 
   
3.1 Introduction
  3 - 1
3.2 Transport
  3 - 1
3.3 Electricity
  3 - 8
3.4 Education and Training
  3 - 13
3.5 Housing
  3 - 16
3.6 Health
  3 - 19
3.7 Environment and Natural Resources
  3 - 22
3.8 Water
  3 - 25
3.9 Public Order and Safety
  3 - 28
3.10 Recreation and Culture
  3 - 32
3.11 Other (Including Social Security and Welfare)
  3 - 35
 
   
Chapter 4: General Government Sector Projects
   
 
   
4.1 General Government Sector Projects
  4 - 1
 
   
Chapter 5: Public Trading Enterprise Sector Projects
   
 
   
5.1 Public Trading Enterprise Sector Projects
  5 - 1
Chart and Table List
Infrastructure Statement 2011-12

 


 

Notes to Using These Budget Papers
Figures in tables, charts and text have been rounded. Discrepancies between totals and sums of components reflect rounding. Percentage changes are based on the underlying unrounded amounts.
Infrastructure Statement 2011-12

 


 

Chapter 1: Infrastructure Overview
1.1 Introduction
Over the four years to 2014-15, New South Wales will undertake a record infrastructure investment program worth $62.6 billion. This includes $15.3 billion in 2011-12 and an average of $15.8 billion per annum in the following three years.
Pending a new agreement with the Australian Government concerning transport funding from 2014-15, infrastructure spending peaks in 2013-14 with the completion of the Royal North Shore Hospital redevelopment as a public private partnership.1
The Australian Government’s Economic Stimulus Plan significantly increased capital expenditure in New South Wales in 2009-10 and 2010-11 ($3.0 billion and $1.7 billion, respectively). This expenditure effectively concludes in 2011-12 when expenditure totals $221 million.
Table 1.1: Infrastructure Investment Summary
                                                         
    2010-11   2011-12   2012-13   2013-14   2014-15   2011-15
    Budget   Est. Actual   Budget   Forward estimates   Total
               
    $m   $m   $m   $m   $m   $m   $m
 
General Government Sector
    7,677       7,047       6,841       6,738       6,484       5,177       25,240  
Public Trading Enterprise Sector
    8,901       7,819       8,456       8,895       9,966       9,994       37,312  
 
Total(a)
    16,568       14,895       15,303       15,639       16,452       15,177       62,571  
 
Total without Stimulus(b)
    14,717       13,196       15,082       15,639       16,452       15,177       62,350  
 
 
(a)   Total State infrastructure investment may not be the sum of general government and Public Trading Enterprise sector investment because of inter-sector purchases and minor assets in the Public Financial Enterprise sector.
 
(b)   Total infrastructure investments excluding capital spending funded under the Australian Government’s Economic Stimulus package.
The State’s infrastructure is provided and maintained to meet service delivery needs. The program ranges from the construction of major infrastructure such as roads (e.g. the Hunter Expressway), railways (e.g. the North West Rail Link) and hospitals (e.g. the Royal North Shore Hospital redevelopment) to the acquisition and maintenance of minor plant and equipment.
The infrastructure program represents planned investment at a point in time. Variations between budgeted infrastructure investment and actual outcomes reflect a range of factors including construction schedule adjustments due to weather conditions, prices varying from pre-tender estimates and revisions to the scope of projects.
 
1   Public private partnerships are substantially brought to account in the year of completion.
     
Infrastructure Statement 2011-12   1 - 1

 


 

General Government Sector
General government sector agencies provide essential public services in areas such as health, education, roads and police. Most general government agencies are directly or indirectly dependent on the Budget for funding.
The infrastructure programs for agencies in this sector reflect Government priorities. As outlined in Chapter 2, the Government has initiated a range of strategies to improve the planning, procurement and management of the State’s infrastructure program.
Public Trading Enterprise Sector
The public trading enterprise (PTE) sector includes both commercial and non-commercial agencies that provide major economic services such as water, sewerage, electricity, housing and transport. Commercial PTEs receive the majority of their income from customers. Infrastructure investment decisions are driven by commercial considerations and are financed from revenue and borrowings. Non-commercial PTEs receive funding from the Budget for the majority of their infrastructure investment.
The Government-appointed Boards of PTEs ensure they make appropriate investment decisions. Investment decisions by PTEs are also required to be consistent with the principles underlying the Government’s Total Asset Management policy, as outlined in Chapter 2.
1.2 Infrastructure Investment Overview
2011-12 Infrastructure Investment
In 2011-12, total State infrastructure investment is budgeted at $15.3 billion, 2.7 per cent above 2010-11. After adjusting for the Economic Stimulus Plan, the underlying infrastructure investment program is expected to increase by $1.9 billion or 14.3 per cent compared with 2010-11.
The $1.9 billion increase in the underlying program comprises $1.2 billion (17.3 per cent growth) in the PTE sector and $661 million (11.1 per cent growth) in the general government sector. The growth in the program is primarily due to higher expenditure on rail and electricity in the PTE sector and on health and roads in the general government sector.
     
1 - 2   Infrastructure Statement 2011-12

 


 

Chart 1.1 shows infrastructure investment by policy area and demonstrates, in particular, the Government’s focus on improving transport infrastructure.
Chart 1.1: Total State Sector Infrastructure Investment, 2011-12: by Policy Area
(GRAPHIC)
State Total = $ 15.3 billion
The policy areas are based on the Australian Bureau of Statistics system of Government Finance Statistics (GFS). GFS policy areas do not always align with individual agency infrastructure investment budgets as an agency can provide a range of services that are classified into more than one GFS policy area.
Infrastructure investment in all policy areas must serve to improve the state of New South Wales. As such, each policy area has objectives that infrastructure investments must meet.
Chapter 3 provides a high level description of service delivery objectives for each policy area and their contribution to the NSW 2021 Plan and other Government priorities. Also included are details of major projects being undertaken in the 2011-12 Budget, projects completed in 2010-11 and details of the service delivery benefits of individual projects.
General Government Sector
General government sector infrastructure investment in 2011-12 will total $6.8 billion. After adjusting for the Australian Government funded Economic Stimulus in education and roads, the underlying capital program shows an increase of $661 million or 11.1 per cent in 2011-12 including increased spending on health ($70 million) and roads ($570 million).
Major investments in 2011-12 include:
  $3.2 billion for roads, including $1 billion for work on the Pacific Highway, $250 million for work on the Hume Highway and $570 million to continue work on the Hunter Expressway
     
Infrastructure Statement 2011-12   1 - 3

 


 

  $1.1 billion capital works program in the Health sector (including $921 million capital expenditure and $161 million recurrent expenditure on capital works) for investment in new hospitals, hospital upgrades, medical equipment, health technology programs, information and communication technology, regional cancer centres, improved mental health facilities, ambulance infrastructure and other new health projects
 
  $740 million for education and training, including $221 million for primary schools under the Building the Education Revolution program, $190 million on 49 major school projects and $68 million on 31 major TAFE projects
 
  $222 million for land acquisition for the North West Rail Link. This is in addition to $92 million of spending in the Public Trading Enterprise sector to start the project.
 
  $119 million for acquisition of 261 new buses for the State Transit Authority and private operators.
Public Trading Enterprise Sector
PTE sector infrastructure spending in 2011-12 is budgeted at $8.5 billion. Adjusting for Economic Stimulus funding for housing, underlying expenditure in the PTE sector grows by $1.2 billion or 17.3 per cent growth in 2011-12. This $1.2 billion increase is due in part to higher spending by the three electricity distributors and Transgrid ($633 million) and an acceleration in the delivery program for new Waratah rail carriages ($364 million).
Major investments in 2011-12 include:
  $4 billion in the electricity sector, including programs of work for distribution and transmission networks and at power stations
 
  $2.2 billion for rail projects, including $198 million for work on the Rail Clearways program, $292 million for the South West Rail Link, $130 million toward the acquisition of Outer Suburban Rail Carriages — Tranche 3, and $92 million to start North West Rail Link, in addition to $222 million of spending in the General Government sector to secure the rail corridor
 
  $835.5 million by Sydney Water and Hunter Water for water and sewerage projects
 
  $449 million for social housing by the NSW Land and Housing Corporation to enable the construction of 2,518 new dwellings and the upgrade of existing properties
 
  $389 million for port projects, including $109 million towards an Intermodal Logistic Centre at Enfield, $74 million for the continued construction of a third container terminal at Port Botany, $54 million for a new Passenger Cruise Terminal at White Bay and $53 million for a Second Bulk Liquids Berth at Port Botany.
     
1 - 4   Infrastructure Statement 2011-12

 


 

The level of infrastructure investment across agencies in 2011-12 is shown in Chart 1.2. The top 20 agencies account for $14 billion or 91.1 per cent of total State investment.
Chart 1.2: State Infrastructure Investment 2011-12
(GRAPHIC)
 
*   Does not include $161 million capital expensing.
Infrastructure Investment 2011-12 to 2014-15
Over the four years to 2014-15, the State’s infrastructure investment will total a record $62.6 billion, which is $7 billion or 12.5 per cent above the previous four year investment of $55.6 billion to 2010-11. The increase comprises an additional $962 million or 4 per cent in the general government sector, and an additional $6 billion or 19.1 per cent in the PTE sector.
     
Infrastructure Statement 2011-12   1 - 5

 


 

Chart 1.3 shows the estimated distribution of the State’s four-year infrastructure investment program.
Chart 1.3: Total State Sector Infrastructure Investment, 2011-12 to 2014-15: by Sector
(GRAPHIC)
State Total = $62.6 billion
The sectors used are based on grouping similar agencies together. This approximates Chart 1.1 for 2011-12 which shows policy areas based on the Australian Bureau of Statistics system of Government Finance Statistics. Infrastructure investment allocations to sectors beyond 2011-12 are indicative only.
Major infrastructure investments over the four years include:
  $23.7 billion for transport including:
    $10.3 billion for roads, including $3.6 billion for the Pacific Highway, $1.3 billion for the Hunter Expressway, $540 million for the Great Western Highway, $470 million for the Princes Highway and over $200 million for the safety and congestion package
 
    $1.7 billion for the South West Rail Link, $1.8 billion for new Waratah PPP rollingstock, $410 million for rollingstock upgrades and $409 million for additional bus fleet and network services and a provisional estimate of $2.5 billion for the North West Rail Link
  $16.8 billion for electricity infrastructure to ensure a reliable electricity supply that meets growing demand in New South Wales, including $13.6 billion on distribution systems, and $2.8 billion by TransGrid on the transmission network. In addition, funding of $314 million is allocated to upgrades of the State’s generation capacity.
     
1 - 6   Infrastructure Statement 2011-12

 


 

  $4.7 billion for water and sewerage including $3.2 billion by Sydney Water, $918 million by Hunter Water and $423 million by the State Water Corporation. Sydney Water’s major projects include $799 million on growth works to service urban development, $480 million to maintain the water distribution network and $399 million to maintain sewer reliability. Hunter Water’s capital program includes $120 million on sewerage system upgrades and $128 million on the Grahamstown Water Treatment Plant. State Water will spend $178 million on safety upgrades to a range of dams as part of a comprehensive program to provide a secure and sustainable water supply.
 
  $4.3 billion for health including $81 million for the Liverpool Hospital redevelopment, $41 million for Nepean Hospital upgrade, $741 million for the Royal North Shore Hospital redevelopment, $133 million for seven cancer care centres around the State, $110 million for Port Macquarie Hospital expansion, $47 million for Prince of Wales Cancer and Blood Disorder Unit, $48 million for Electronic Medical Record rollout to clinical specialties, $86 million on Wollongong Hospital, $184 million on delivering additional rehabilitation and Sub-Acute beds under the COAG National Partnership for Improving Hospital Services, $41 million on the Graythwaite Rehabilitation Centre, $43 million for ICU Clinical Information System and $71 million for Electronic Medications Management
 
  $2.2 billion for education and training including around $450 million each year for works at schools and TAFE Colleges, $221 million for the Building the Education Revolution Program and $236 million for Information Technology
 
  $2.1 billion for housing including $1.7 billion for 3,900 new dwellings under the NSW Land and Housing Corporation’s social housing program, $152 million for 330 new dwellings under the National Partnership Agreement on Remote Indigenous Housing and the Aboriginal Housing Office’s ongoing capital works program.
 
  Negotiations are being finalised with the Australian Government on accelerating investment in the Pacific Highway. Funding for this investment, together with additional investment in the Princes Highway, will be priorities for the funding released from the Sydney Desalination Facility and port facilities at Port Botany.
As illustrated in Chart 1.4, there has been a significant growth in the State’s capital program since 2005-06. This Budget enhances these higher levels of capital expenditure. However, the value for money achieved by this expenditure will be substantially increased in future through the implementation of the reforms to planning, procurement and management of infrastructure assets as set out in Chapter 2.
     
Infrastructure Statement 2011-12   1 - 7

 


 

Chart 1.4: Total State Infrastructure Investment 2005-06 — 2014-15
(GRAPHIC)
Percentages shown are the change in total State investment from the previous year
As shown in Table 1.2, NSW Government funding of the general government sector capital expenditure program remains at a fairly constant level over the next four years, after allowing for the impact of the Royal North Shore Hospital redevelopment.
The investment in the Royal North Shore Hospital redevelopment is procured as a public private partnership and is therefore substantially brought to account as a finance lease on completion in 2013-14 ($650 million) rather than progressively over the construction period.
Capital expenditure funded by the Australian Government decreases in each of the next four years. In particular, capital expenditure associated with the Economic Stimulus Plan, announced by the Australian Government on 5 February 2009, ceases in 2011-12.
The Australian Government funded road building program declines after 2012-13 reflecting the completion of projects primarily funded through the Building Australia Fund, including the Kempsey Bypass on the Pacific Highway ($618 million) and the Hunter Expressway ($1.7 billion). Additionally, three bypasses on the Hume Highway at Holbrook, Tarcutta and Woomargama will be completed at a total cost of $802 million with funding sourced from Nation Building payments provided prior to June 2010.
A new transport funding agreement is to be negotiated with the Australian Government for 2014-15 onwards, which could be expected to result in additional Australian Government funded expenditure.
     
1 - 8   Infrastructure Statement 2011-12

 


 

Table 1.2: General Government Sector Infrastructure Investment
                                         
    2010-11   2011-12   2012-13   2013-14   2014-15
    Est. Actual   Budget   Forward estimates
    $m   $m   $m   $m   $m
 
State Funded Program
                                       
State Funded Program excluding RNSH redevelopment
    4,256       4,334       4,568       4,617       4,588  
Royal North Shore Hospital redevelopment PPP
                            650       22  
Australian Government Funded Program
                                       
Fiscal Stimulus
    1,088       221                            
Other2
    1,703       2,286       2,170       1,217       567  
 
Total
    7,047       6,841       6,738       6,484       5,177  
 
State funding of the Total State Sector infrastructure program broadly increases over the next four years, as demonstrated in Table 1.3. This reflects growing investment in the PTE sector, including electricity, rail and water and sewerage.
Table 1.3: Total State Sector Infrastructure Investment
                                         
    2010-11   2011-12   2012-13   2013-14   2014-15
    Est. Actual   Budget   Forward estimates
    $m   $m   $m   $m   $m
 
State Funded Program
                                       
State Funded Program excluding RNSH redevelopment
    11,224       12,549       13,273       14,406       14,387  
Royal North Shore Hospital redevelopment PPP
                            650       22  
Australian Government Funded Program
                                       
Fiscal Stimulus
    1,699       221                          
Other2
    1,972       2,533       2,366       1,396       768  
 
Total
    14,895       15,303       15,639       16,452       15,177  
 
2010-11 Infrastructure Investment
Total State infrastructure investment of $14.9 billion is estimated for 2010-11. This is $1.7 billion or 10.1 per cent below the $16.6 billion forecast in the 2010-11 Budget. In 2010-11 PTE spending was $1.1 billion or 12.2 per cent below budget, while general government sector spending was $630 million or 8.2 per cent lower than budget.
 
2   Principally comprises road projects including Pacific Highway, Hume Highway and Hunter Expressway.
     
Infrastructure Statement 2011-12   1 - 9

 


 

General Government Sector
Infrastructure investment by the general government sector in 2010-11 is expected to be $7 billion. This was $630 million or 8.2 per cent below budget due to:
  Roads and Traffic Authority expenditure being $169 million below budget because of delays in delivery of the Hunter Expressway and delays in upgrading the Hume Highway, Pacific Highway and Great Western Highway due mainly to wet weather. In addition, the cost of the Holbrook Bypass on the Hume Highway was under budget by $66 million (including $47 million in 2010-11)
 
  Department of Health expenditure being $102 million below budget due to delays in signing projects to be funded under the National Partnership Agreement ($62 million) and slippage in other projects. This expenditure will now be incurred in 2011-12.
 
  Department of Education and Communities expenditure being $129 million below budget due primarily to changed project scheduling under the Building the Education Revolution program
 
  agency delay in land acquisitions for rail corridors, primarily the North West Rail Link, resulting in underspending of $45 million.
Major investments completed in 2010-11 (with estimated total cost) include:
  Orange-Bloomfield Hospital Redevelopment, including Public Private Partnership costs ($260 million)
 
  17 school projects including upgrades and refurbished teaching and learning facilities, new halls and gyms, and trade training facilities, including major upgrades at Coffs Harbour, Chatswood, Tumut and Hazelbrook ($90 million)
 
  14 TAFE projects providing upgraded teaching and learning facilities at colleges, including major upgrades at Randwick, Macquarie Fields and Hamilton as well as upgrades funded by the Australian Government’s Education Investment Fund ($71 million),
 
  new police stations at Kempsey and Granville ($24 million)
 
  Homebush and Lidcombe rail turnbacks ($103 million) and 565 buses for State Transit Authority and private bus operators ($305 million)
 
  Pacific Highway, Moorland to Herons Creek dual carriageway ($378 million, jointly funded with the Australian Government) and the Ballina Bypass Stage 1 (part of the overall project valued at $640 million, jointly funded with the Australian Government).
     
1 - 10   Infrastructure Statement 2011-12

 


 

Public Trading Enterprise Sector
At $7.8 billion, infrastructure investment by the PTE sector is expected to be under budget in 2010-11 by $1.1 billion or 12.2 per cent primarily due to:
  electricity sector agencies being $552 million below budget as follows:
    Transgrid (total reduction in 2010-11 of $135 million) — revised scheduling from 2010-11 and 2011-12 to later years projects including Western Sydney Supply, the Dumaresq-Lismore 330kV transmission line, the Wallaroo 330kv switching station and the Tomago-Tarro-Stroud 132kv transmission line
 
    Essential Energy (total reduction in 2010-11 of $186 million) — a range of capital projects have progressed more slowly than planned, including IT works, while there have also been rain delays to a number of internally funded transmission line projects, including Koolkham to Maclean, Deniliquin to Moama, and Mulwala to Finley
 
    changes in forecast capital expenditure in the generation sector reflect the energy transaction, where investment incurred under the ‘gentrader’ model is classified as operating expenditure (with offsetting revenue), not capital
  Sydney Ports Corporation being $142 million below budget due to delays in signing the main construction contracts for Enfield Intermodal Logistics Centre and Second Bulk Liquids Berth, and projects related to Port Botany expansion
 
  RailCorp expenditure being $167 million below budget because of delays in the delivery of Waratah Rollingstock
 
  Transport Construction Authority expenditure being $140 million below budget due to the rescheduled commencement of Auburn stabling facility and resolution of scope for the Airport Line power upgrade ($45 million), reduction of required program contingency and reduced overall program cost on car parks and interchanges ($95 million).
Major investments completed in 2010-11 (with estimated total cost) include:
  continued priority sewerage program works (Yellow Rock at Hawkesbury Heights and Agnes Banks at Londonderry) ($75 million)
 
  upgrades and improvements of existing social housing at a cost of $256.1 million, as well as the completion of 106 new dwellings in Redfern ($36.7 million), 88 new dwellings in Lilyfield ($27.7 million), and 48 new dwellings in Abbottsford ($13.1 million)
 
  wastewater upgrades by Hunter Water ($110 million)
 
  dam safety upgrades by State Water ($65 million)
 
  expansion of Port Botany ($121 million)
     
Infrastructure Statement 2011-12   1 - 11

 


 

  zone substations commissioned at Wagga, Ballina, Pacific Palms, Malanganee, Buronga, Bella Vista, Mungerie Park, Jesmond, Adamstown, Kurri, Hunter Valley and in the Sydney area ($324 million)
 
  sub-transmission substation work at Kurnell and Ourimbah, and new and replacement sub-transmission feeders completed at Riverwood, Rozelle, Turramurra, Terrey Hills and Nelson Bay ($122 million)
 
  a new 330kV substation at Tomago and 132kV Armidale to Coffs Harbour transmission line upgrades completed by Transgrid ($93 million).
1.3 Value of the State’s Physical Assets
The State’s physical assets are predominately land and buildings, plant and machinery and infrastructure systems. These assets include public schools, TAFE facilities, hospitals, police and court facilities, transport networks, public housing and recreation facilities, as well as infrastructure such as roads, electricity generation, transmission and distribution networks, water storage and supply networks, and ports facilities. Physical assets owned by the State are defined to exclude inventories, intangibles and assets held for sale.
As shown in Table 1.4, the State’s infrastructure across both the general government and PTE sectors had a value of $236 billion as at June 2010 and is estimated to have a value of $246 billion as at June 2011.
The table does not include the public financial enterprise sector which has very little infrastructure. The general government sector controlled $123 billion of infrastructure and the PTE sector $112 billion as at June 2010.
The value of infrastructure, net of depreciation, is expected to increase during 2011-12 by $6.3 billion in the general government sector and by $4.7 billion in the PTE sector.
Table 1.4: State Owned Physical Assets: Value by Sector
                                         
    2008   2009   2010   2011   2012
    Actual   Actual   Actual   Est. Actual   Budget
As at 30 June   $m   $m   $m   $m   $m
 
General Government Sector
    100,147       109,387       123,471       128,045       134,357  
Public Trading Enterprise Sector
    98,282       101,546       112,344       117,662       122,347  
 
Total State Sector
    198,429       210,933       235,815       245,708       256,704  
 
     
1 - 12   Infrastructure Statement 2011-12

 


 

As shown in Chart 1.5, in June 2010 the largest component of these assets is infrastructure systems such as railways, roads, ports, dams and pipelines, with the balance comprising land (23.6 per cent), buildings (20.9 per cent), and plant and equipment (5.1 per cent). The land component value of infrastructure has been separated from buildings, providing a clear delineation between built and non-built infrastructure.
Chart 1.5: State Owned Physical Assets: Distribution by Category as at 30 June 2010
(GRAPHIC)
State Total = $236 billion
Control of the State’s infrastructure is concentrated in a relatively small number of agencies. As shown in Chart 1.6, approximately 77 per cent is controlled by only 10 agencies.
     
Infrastructure Statement 2011-12   1 - 13

 


 

Chart 1.6: State Owned Infrastructure: Percentage Distribution by Agency as at 30 June 2010
(GRAPHIC)
Source: 2009-10 Agency Annual Reports
State assets are recorded at fair value, in accordance with accounting policies and standards. Where practicable, fair value is measured at its highest and best use. An asset with no feasible alternative use may be valued at fair value for its existing use.
A quoted market price for an asset in an active and liquid market is the best indication of fair value, but where this does not exist, market prices for similar assets can be used. Specialised assets are valued using the replacement cost of the remaining economic benefits. General government sector physical assets support the delivery of social benefits to the community.
The following table provides the value and composition of physical assets as at 30 June 2010 for both general government and public trading enterprise sectors. The table lists the legal reporting entities at that time i.e. it does not reflect the restructure of government agencies in April 2011. Audited financial statements as at 30 June 2011 will not be available until they are tabled in Parliament in November 2011.
     
1 - 14   Infrastructure Statement 2011-12

 


 

Table 1.5: Value of Agencies’ Physical Assets as at 30 June 2010
                                         
                    Plant and   Infrastructure    
    Land   Buildings   Equipment   Systems   Total
Agency   $000   $000   $000   $000   $000
 
General Government
                                       
Aboriginal Housing Office
    630,876       325,525       225       13,156       969,782  
Art Gallery of New South Wales
    17,250       168,971       831,660             1,017,881  
Audit Office of New South Wales
          1,229       473             1,702  
Australian Museum
    35,500       181,043       807,315       3,150       1,027,008  
Barangaroo Delivery Authority
    410,000             394       3,952       414,346  
Building and Construction Industry Long Service Payments
                926             926  
Cancer Institute NSW
                1,575             1,575  
Casino, Liquor and Gaming Control Authority
                90             90  
Catchment Management Authorities
    3,107       1,540       1,375             6,022  
Centennial Park and Moore Park Trust
    401,044       71,697       1,230       302,643       776,614  
Communities NSW
    143,178       331,461       17,907             492,546  
Community Relations Commission of New South Wales
          21       102             123  
Crown Finance Entity
                151             151  
Department of Education and Training
    6,367,642       12,358,664       302,589             19,028,895  
Department of Environment, Climate Change and Water
    1,902,660       280,724       71,071       1,609,786       3,864,241  
Department of Health
    1,593,862       7,433,326       742,086       357,779       10,127,053  
Department of Human Services
    444,977       550,192       45,429             1,040,598  
Department of Industry and Investment
    95,682       160,132       36,577       43,807       336,198  
Department of Justice and Attorney General
    312,360       2,390,634       198,913             2,901,907  
Department of Planning
    8,460             5,657             14,117  
Department of Premier and Cabinet
                10,850             10,850  
Department of Rural Fire Service
                15,666             15,666  
Department of Services, Technology and Administration
    16,406       5,023       629,399             650,828  
Events New South Wales Pty Limited
          413       256             669  
Health Care Complaints Commission
          48       345             393  
Historic Houses Trust of New South Wales
    136,322       134,754       37,417       4,871       313,364  
Home Care Service of New South Wales
    70       387       6,357             6,814  
Hunter Development Corporation
                285             285  
Independent Commission Against Corruption
          286       908             1,194  
Independent Pricing and Regulatory Tribunal
                1,994             1,994  
Independent Transport Safety and Reliability Regulator
                199             199  
Judicial Commission of New South Wales
                268             268  
Land and Property Management Authority
    5,931,085       74,003       20,228       460,419       6,485,735  
Legal Aid Commission of New South Wales
          6,880       3,439             10,319  
Luna Park Reserve Trust
    12,000       12,494             6,931       31,425  
Maritime Authority of New South Wales
    73,394       174,979       16,846       1,124,381       1,389,600  
Minister Administering the Environmental Planning and Assessment Act
    1,240,902       17,707             127       1,258,736  
Motor Accidents Authority
          2,190       126             2,316  
Museum of Applied Arts and Sciences
    39,100       104,890       405,954             549,944  
Natural Resources Commission
                289             289  
New South Wales Crime Commission
                2,033             2,033  
New South Wales Electoral Commission
                2,637             2,637  
New South Wales Film and Television Office
                79             79  
New South Wales Fire Brigades
    132,921       162,002       199,532             494,455  
New South Wales Rural Assistance Authority
                98             98  
NSW Businesslink Pty Limited
          437       13,588             14,025  
NSW Food Authority
    1,725       6,875       1,921             10,521  
     
Infrastructure Statement 2011-12   1 - 15

 


 

                                         
                    Plant and   Infrastructure    
    Land   Buildings   Equipment   Systems   Total
Agency   $000   $000   $000   $000   $000
 
General Government (cont)
                                       
NSW Police Force
    442,873       754,870       309,770             1,507,513  
NSW Self Insurance Corporation
                247             247  
NSW Trustee and Guardian
    9,640       11,217       4,088             24,945  
Office of the Board of Studies
          2,080       2,938             5,018  
Office of the Director of Public Prosecutions
                16,622             16,622  
Office of the Information Commissioner
                297             297  
Office of Transport Safety Investigations
          124       33             157  
Ombudsman’s Office
                1,173             1,173  
Police Integrity Commission
          808       2,216             3,024  
Redfern-Waterloo Authority
          158,500       22,652             181,152  
Roads and Traffic Authority of New South Wales
    6,996,549       584,438       197,560       53,668,413       61,446,960  
Royal Botanic Gardens and Domain Trust
    157,561       46,189       36,885       37,341       277,976  
State Emergency Service
    166             15,110             15,276  
State Library of New South Wales
    64,682       153,539       2,156,529             2,374,750  
State Property Authority
    315,671       524,476       2,019             842,166  
State Records Authority
    8,000       39,420       6,437             53,857  
Superannuation Administration Corporation
    4,065       5,700       2,659             12,424  
Sydney Olympic Park Authority
    658,346       331,034       55,553       373,785       1,418,718  
The Legislature
    48,700       80,661       55,310             184,671  
The Treasury
                14,002             14,002  
Transport NSW
          199       623,765       1,479       625,443  
Water Administration Ministerial Corporation
    12             3,527       652,699       656,238  
Western Sydney Parklands Trust
    464,240       4,613       625       23,024       492,502  
WorkCover Authority
    12,810       5,113       15,155             33,078  
Workers’ Compensation (Dust Diseases) Board
          5,413       1,173             6,586  
 
TOTAL GENERAL GOVERNMENT
    29,133,838       27,666,921       7,982,804       58,687,743       123,471,306  
 
     
1 - 16   Infrastructure Statement 2011-12

 


 

                                         
                    Plant and   Infrastructure    
    Land   Buildings   Equipment   Systems   Total
Agency   $000   $000   $000   $000   $000
 
Public Trading Enterprises
                                       
City West Housing Pty Limited
    101,776       149,613       26             251,415  
Country Energy
    53,115       91,748       212,660       5,547,585       5,905,108  
Delta Electricity
    49,355       33       11,152       2,494,871       2,555,411  
EnergyAustralia
    267,121       226,365       281,894       7,940,098       8,715,478  
Eraring Energy
    25,257       8,013       11,701       1,845,710       1,890,681  
Forests NSW
    1,028,808       21,666       20,902       66,811       1,138,187  
Hunter Region Sporting Venues Authority
    12,460       69,106       1,702       28,452       111,720  
Hunter Water Corporation
    148,364       34,700       9,778       2,626,351       2,819,193  
Illawarra Venues Authority
    17,500       45,327       817             63,644  
Integral Energy Australia
    45,151       322,680       104,879       3,803,023       4,275,733  
Landcom
    1,136       805       1,350             3,291  
Macquarie Generation
    26,791       2,599       16,636       3,312,897       3,358,923  
New South Wales Land and Housing Corporation
    17,710,969       12,831,865       15,485       1,376,375       31,934,694  
Newcastle Port Corporation
    271,391       11,195       19,591       86,098       388,275  
Parramatta Stadium Trust (a)
    14,600       19,896       9,994       544       45,034  
Port Kembla Port Corporation
    28,954       139,562       3,676       191,965       364,157  
Public Transport Ticketing Corporation
                259             259  
Rail Corporation New South Wales
    3,688,803       3,628,633       2,698,745       9,369,092       19,385,273  
Rail Infrastructure Corporation
    232,639       18,090       639       1,932,515       2,183,883  
Residual Business Management Corporation
                15             15  
State Transit Authority
    124,691       103,904       181,251       70,135       479,981  
State Water Corporation
    109,672       2,388       13,820       429,697       555,577  
Sydney Catchment Authority
    60,422       21,913       11,123       1,239,120       1,332,578  
Sydney Cricket and Sports Ground Trust(a)
    35,700       527,485       4,899             568,084  
Sydney Ferries
    5,737       6,959       56,114       30,403       99,213  
Sydney Harbour Foreshore Authority
    225,612       710,000       55,028       8,379       999,019  
Sydney Metro
          55,169       671             55,840  
Sydney Opera House
    111,000       1,919,658       73,806             2,104,464  
Sydney Ports Corporation
    571,664       66,480       27,383       756,134       1,421,661  
Sydney Water Corporation
    975,715       37,946       161,375       12,300,058       13,475,094  
Teacher Housing Authority
    30,124       115,834       78             146,036  
TransGrid
    350,089       61,584       63,135       4,660,939       5,135,747  
Transport Infrastructure Development Corporation
    71,079                   260,017       331,096  
WSN Environmental Solutions
    99,410       141,828       45,327       9,501       296,066  
Zoological Parks Board
    61,400       260,526       1,788       45,707       369,421  
Adjustment less capitalised interest expensed through consolidation(b)
                      (416,611 )     (416,611 )
 
TOTAL PUBLIC TRADING ENTERPRISES
    26,556,505       21,653,570       4,117,699       60,015,866       112,343,640  
 
TOTAL GOVERNMENT(c)
    55,690,343       49,320,491       12,100,503       118,703,609       235,814,946  
 
 
Notes:   Table 1.5 includes only the value of agencies’ land and buildings, plant and equipment, and infrastructure systems. It includes collection assets but does not include the minor value of other physical assets such as inventories and software. Due to public sector reporting policy, the above dissection may differ slightly to the classification in some agencies’ audited financial reports. The totals will remain consistent with agencies’ audited figures.
 
(a)   The figures for the Parramatta Stadium Trust are as at 31 December 2009 and those for the Sydney Cricket and Sports Ground Trust are as at 28 February 2010, in accordance with the financial reporting periods used by these agencies.
 
(b)   Reflects the value of interest capitalised by the above agencies subsequently expensed in the consolidated sector reports.
 
(c)   Excludes the public financial enterprise sector.
     
Infrastructure Statement 2011-12   1 - 17

 


 

1.4 Infrastructure Maintenance
Agencies must ensure that their infrastructure continues to support the planned delivery of services and that it is adequately maintained. NSW Treasury guidelines require that direct employee costs on infrastructure maintenance activities are reported as part of an agency’s maintenance expenditure. This is to ensure that reporting of maintenance expenditure is not understated and any shortfalls in maintenance spending are quickly identified. The result is a more comprehensive and consistent reporting of infrastructure maintenance costs.
The maintenance expenditure estimates for the general government and PTE sectors are set out in Table 1.6.
Table 1 .6 Maintenance Expenses
                                                 
    2010-11   2011-12   2012-13   2013-14   2014-15
    Budget   Est. Actual   Budget   Forward estimates
    $m   $m   $m   $m   $m   $m
 
General Government Sector
    2,057       1,906       1,997       1,991       1 948       1,772  
Public Trading Enterprise Sector
    2,501       2,513       2,636       2,735       2,719       2,587  
 
Total
    4,558       4,418       4,633       4,726       4,667       4,358  
 
Expenditure on asset maintenance in 2010-11 is equivalent to 2.3 per cent of the Government’s estimated total built asset holdings as at 30 June 2011. This percentage is also estimated to be 2.3 per cent for 2011-12. The Government’s asset management policies are described in Chapter 2.
     
1 - 18   Infrastructure Statement 2011-12

 


 

Chapter 2: Infrastructure Policies and Strategies
2.1 Introduction
The Government is committed under NSW 2021 — A Plan to Make NSW Number One to rebuilding the State’s infrastructure to support economic growth, improve productivity and competiveness and the quality of life for NSW citizens.
The Government has passed legislation to establish Infrastructure NSW to provide strategic policy direction and oversight for infrastructure planning and delivery.
The NSW Government is also working with the Australian Government and Infrastructure Australia to prioritise the building of nationally significant infrastructure in New South Wales.
The Government is committed to improving public sector procurement processes for infrastructure investment. Reforms will streamline and update policies to reflect contemporary policy and practice. Under the auspices of the Council of Australian Governments (COAG), New South Wales is working with other states and territories to harmonise construction contractor procurement.
2.2 Infrastructure NSW
Infrastructure NSW (INSW) has been established as a statutory authority under the Infrastructure NSW Act 2011. Its objective is to provide independent advice on the efficient and effective selection, delivery and management of critical infrastructure across New South Wales.
INSW is headed by an independent Board that comprises an independent Chair (appointed by the Premier), five independent expert members, the Chief Executive Officer of INSW, Directors General of Premier and Cabinet, Trade and Investment, Regional Infrastructure and Services, Planning and Infrastructure and the Secretary of the Treasury. The Board reports to the new Cabinet Infrastructure Committee chaired by the Premier.
INSW’s functions include:
  developing infrastructure strategies and plans for New South Wales
  reviewing and evaluating proposed major infrastructure projects
  advising on the priority of infrastructure projects and, where appropriate, advising on alternative solutions to meet infrastructure priorities
  overseeing and monitoring the implementation of key projects and, where required, having the capacity to ‘step in’ and deliver projects
     
Infrastructure Statement 2011-12   2 - 1

 


 

  undertaking ex-post reviews of completed projects
  advising the Government on economic and regulatory impediments to infrastructure and funding approaches
  coordinating infrastructure funding submissions to the Australian Government.
Restart NSW
To finance major infrastructure projects which will improve economic growth and productivity in New South Wales, the Government is establishing the Restart NSW Fund. The Restart NSW Fund will finance projects that will provide better public transport, roads, infrastructure for improved economic competitiveness, local infrastructure in regional areas, and hospitals and workplaces for front-line service staff. Projects to be funded by the Restart NSW Fund will be recommended by INSW and assessed in the Budget process. Thirty per cent of funding is to be reserved for non-metropolitan areas, including mining-affected communities.
Restart NSW projects will be funded through the Budget, including any such money certified as windfall tax revenue in excess of Budget forecasts when in surplus. Additionally, funding includes the retail issue of Waratah bonds to the people of New South Wales.
2.3 Infrastructure Planning
The population of New South Wales is expected to increase from 7.2 million in 2010 to 10.6 million in 20513. This will drive demand for new infrastructure and the need to maintain existing assets up to standard.
The Government is committed to meeting the growing service delivery needs of the community including through provision of essential new infrastructure, maintaining and promoting better use of existing assets and ensuring regulatory settings are conducive to private investment in infrastructure.
Infrastructure NSW will lead infrastructure planning and will be responsible for preparing strategies that thematically set out the long-term infrastructure priorities across New South Wales. Short to medium-term plans will also be developed which will contain projects that best meet these priorities:
  The 20 year State Infrastructure Strategy will set out the long-term, integrated infrastructure requirements of the State. It will be reviewed every 5 years in line with the Census cycle and will also be aligned with the reviews of NSW 2021: A Plan to Make NSW Number One and the 25 year Metropolitan Plans and Regional Plans (particularly in relation to approved land use and planning strategies).
 
3   2011-12 Budget Paper No. 6, NSW Long-Term Fiscal Pressures Report
     
2 - 2   Infrastructure Statement 2011-12

 


 

  The 10 year Infrastructure Plan will be based on the 20 year State Infrastructure Strategy, agency Total Asset Management (TAM) Plans which set out 10 year investment priorities, and Public Trading Enterprise Statements of Business or Corporate Intent. The 10 year Infrastructure Plan will be aligned with the State’s overall fiscal envelope and resourcing constraints and be consistent with agreed COAG city planning criteria. It will be reviewed every year as part of the annual TAM process and published every two years.
  The 5 year Infrastructure Plans will identify immediate priority infrastructure projects, their rationale for selection, timing, estimated cost and recommended funding and delivery model. This pipeline of projects will promote greater certainty for businesses and communities. The 5 year infrastructure plans will be reviewed on an annual basis.
  Infrastructure Strategy Statements will be prepared for key infrastructure sectors nominated by the Premier or Cabinet Infrastructure Committee, such as ports, freight, metropolitan transport and water.
The preparation of the 20 year State Infrastructure Strategy will be underpinned by an audit and capability assessment of existing infrastructure assets, consideration of demand management solutions which better utilise existing assets, sectoral strategy reviews and liaison with Treasury in relation to Budget funding.
Metropolitan Plan and Regional Strategies
The Government will develop long-term plans for Sydney, its sub-regions and other regions of New South Wales to support sustainable growth in housing and employment. These plans will influence Government infrastructure decisions and priorities, including the 20 year State Infrastructure Strategy.
The Metropolitan Plan for Sydney 2036 provides a long-term plan for sustainable growth in the Sydney region. The Plan was completed in 2010-11 and integrates land use planning with the 2010 Metropolitan Transport Plan.
A number of regional strategies are in place for other areas of New South Wales that identify residential, commercial and industrial land capacity to accommodate projected population growth. In 2011-12, there is a focus on new Strategic Regional Land Use Plans for the Upper Hunter and New England North West. These plans will identify ways that regional areas can manage growth, protect the environment and respond to competing land uses.
     
Infrastructure Statement 2011-12   2 - 3

 


 

Local Infrastructure Backlog Policy
The Government is providing funding of $70 million over five years to 2015-16 (including $3.5 million in 2011-12) to implement its Local Government Infrastructure Backlog Policy which includes:
  an audit of each council’s local infrastructure backlog to provide better information on council investment needs being undertaken by the Division of Local Government
  a Local Infrastructure Renewal Scheme to provide interest subsidies to councils for debt raised to help meet infrastructure backlogs
  the benchmarking of council finances including gearing levels and investment strategies.
Eligibility requirements for the Local Infrastructure Renewal Scheme will be designed to provide an incentive for councils to make greater use of debt funding, while retaining the flexibility to choose a mix of funding options (e.g. general or special rates, Australian Government funding and private contributions) tailored to their individual preferences, infrastructure priorities and financing capacity.
The Scheme will be implemented in a way that does not transfer financial risks to the State and preserves the financial autonomy of councils under the Local Government Act 1993. The Scheme will support council borrowings of up to $1 billion to help councils address the audited infrastructure backlog. Any borrowings will be used to fund new works, upgrades, or rejuvenation of infrastructure that meets a core purpose of local government and is intended for community use.
A first round of applications for the Scheme will commence in 2011-12. Applications will be evaluated by an Assessment Panel with an independent chair, to help ensure that the process is fair and transparent. Future application rounds will be timed to interface with the staged implementation of the Integrated Planning and Reporting (IP&R) Framework for councils.
After the first round, the Government will review the program as part of the annual Budget, and may make adjustments to funding and scheme design in subsequent rounds depending on performance, take-up, project size, subsidy required and other outcomes of the first round.
Hunter Infrastructure and Investment Fund
The Government has committed $350 million over four years commencing 2011-12 to establish and resource the Hunter Infrastructure and Investment Fund (HIIF).
The fund will provide additional resources, on top of existing commitments, to upgrade infrastructure in the Hunter region.
     
2 - 4   Infrastructure Statement 2011-12

 


 

Funding from the Government includes:
  $13 million in 2011-12 (a total of $63 million over four years) for grants to Local Government in the Hunter region for road improvements. These road infrastructure projects include Nelson Bay Road Widening, New England Highway Upgrade and Hunter Wine Region Roads Upgrades.
 
  $4 million in 2011-12 (a total of $33 million over four years) for various health infrastructure projects. These projects include upgrade of equipment at the Wansey Dialysis Centre, hospital bed upgrades at Kurri Kurri and Cessnock Hospitals, expansion of the Maitland Hospital Mental Health Unit Services and funding for land adjacent to the Calvary Mater Hospital for a Cancer Research and Treatment Facility.

The Board of the HIIF will review and advise the Government on the allocation of funds. Total funding across the four years is as follows.
Table 2.1: HIIF Four Year Funding
                                         
    2011-12   2012-13   2013-14   2014-15   2011-15
    Budget   Forward estimates   Total
    $m   $m   $m   $m   $m
     
Hunter Infrastructure and Investment Fund
    26.5       85.0       134.0       104.5       350.0  
Agency planning and asset management
The Government aims to ensure its existing State infrastructure and assets continue to meet long-term service delivery priorities. Sound asset management requires an appropriate balance between the acquisition of new assets and the efficient utilisation of existing assets, including disposal of those assets no longer required. It also requires that asset management strategies and activities are integrated with resource allocation decisions.
The continuing development and application of NSW Treasury’s Total Asset Management (TAM) policy is designed to achieve these objectives. Agency asset management plans are founded on a comprehensive approach to service planning and asset procurement in which a range of strategies other than infrastructure spending are considered. Such strategies include regulatory settings that promote new private sector infrastructure investment and demand management techniques to moderate peak demand on infrastructure.
TAM Strategies and 10-year capital expenditure data outline how an agency’s proposed capital expenditure is prioritised and integrated to support its service delivery strategy. Agency TAM submissions are linked to their annual budget proposals, with capital business cases also required as part of the budget process.
     
Infrastructure Statement 2011-12   2 - 5

 


 

Existing processes and requirements under TAM policy provide a strong foundation for effective capital and asset management. Over 2011-12, the Government will continue to develop TAM policy to ensure a more consistent and higher profile application of its principles and closer integration with the Budget process to deliver improved investment outcomes for the community. TAM Asset Strategies and 10 year capital expenditure data will also play a significant role in the development of the Government’s 20 year State Infrastructure Strategy and 10 year Infrastructure Plans, and support other information needs of Infrastructure NSW.
2.4 Infrastructure Procurement
Procurement Policy
The NSW Government Procurement Policy outlines the obligations on agencies in their procurement activities both in achieving value for money and in ensuring procurements are consistent with the Government’s broader policy requirements covering economic, environmental and social objectives.
The Policy emphasises agency accountability for outcomes, greater upfront planning and strong linkage with the Budget process prior to allocating capital funding. It is an overarching framework for all Government procurement and applies to all Government departments, statutory authorities, trusts and other Government entities.
Responsibility for procurement policy was recently transferred to the Department of Finance and Services as part of the Government’s restructuring of the public service.
Over 2011-12, the Department of Finance and Services will revise the policy to include key updates such as free trade agreement procurement requirements, disclosure of contract information, sustainability, training management and tendering, and the role of the State Contracts Control Board. The NSW Government Code of Practice for Procurement is also being updated. This includes rationalising three implementation guidelines into a single document.
The Government procurement website provides agencies with a single source of up—to-date procurement information. The procurement policy framework has been modified to provide simpler, more targeted advice for agencies and industry. Guidance material has also been developed to assist in the practical implementation of procurement policy.
     
2 - 6   Infrastructure Statement 2011-12

 


 

Alliance contracting policy and guidance
The National Alliance Contracting Policy and Guidelines, developed by the Council of Australian Government’s Infrastructure Working Group, was released in August 2011. The policy framework provides a consistent national standard and is underpinned by three main principles.
  Governments should ensure good public accountability and transparency, and protect the public interest.
  Each project should achieve value for money in line with business case commitments.
  An efficient and effective market engagement should be undertaken for each project.
The guidelines have been prepared to:
  provide the minimum conditions in order to comply with the policy principles
  provide guidance for the planning and delivery of alliance projects to enhance value for money outcomes
  improve the quality, consistency and commercial outcomes of alliance projects.
The NSW jurisdictional requirements are currently being developed.
Harmonisation
NSW procurement requirements are being harmonised with other jurisdictions where appropriate. Harmonisation across jurisdictions is a national economic reform that has the potential to deliver benefits to both industry and the public sector. Recent achievements include the harmonisation of the NSW contractor pre-qualification scheme for construction through COAG which commenced on 1 January 2011. The pre-qualification scheme applies to all non-residential building contracts of $50 million or above.
Gateway Reviews
Gateway is a system of structured reviews that examine projects at critical points (Gates) in the procurement process.
A small team of experienced independent procurement practitioners conduct the reviews assessing projects against seven criteria: service delivery, affordability — value for money, sustainability, governance, risk management, stakeholder management and change management.
Reviews produce independent advice about the robustness of the project, and where appropriate, identify weaknesses that should be addressed before proceeding to the next stage.
     
Infrastructure Statement 2011-12   2 - 7

 


 

Since 2004, 350 reviews have been undertaken of projects valued at nearly $40 billion. Construction and Information and Communications Technology projects have contributed to 85 per cent of the total reviews undertaken for 61 per cent of the total project value. The Government will continue to strengthen Gateway’s coverage across all significant capital projects that meet the Gateway review criteria.
Public Private Partnerships
Public Private Partnerships (PPPs) are one of the options the Government uses to procure infrastructure. PPPs are used to deliver improved services and better value for money, primarily through appropriate risk transfer, encouraging innovation, greater asset utilisation and integrated whole-of-life asset management.
The procurement of infrastructure and non-core services complies with Infrastructure Australia’s National PPP Policy and Guidelines (2008). The National Policy and Guidelines includes jurisdictional planning, legislative and approval requirements specific to New South Wales and other states and territories. It also refers to New South Wales’ well established Working with Government Guidelines for Privately Financed Projects. NSW Treasury is continuing to work with Infrastructure Australia in relation to PPPs through the COAG Infrastructure Working Group.
PPP projects cover economic infrastructure (such as toll roads) and social infrastructure (such as hospitals and schools). For social infrastructure PPPs, the private sector capital raised to finance the project is fully recognised as a liability within the Budget post-construction, and is ultimately funded through availability payments from agency budgets. Economic infrastructure PPPs have no impact on the Budget as the private sector sources their revenue through public user charges (such as tolls).
NSW PPPs currently in the construction phase include:
  the M2 Motorway Widening Upgrade (awarded in October 2010 and now under construction)
  the Royal North Shore Hospital Redevelopment — Stage 2 (awarded November 2008 and due for completion in 2013-14)
  Rail Corporation Electric Passenger rollingstock (awarded December 2006 — the first train was delivered in June 2011)
  Bonnyrigg Living Communities Project (awarded April 2007, it has so far delivered 77 social housing dwellings, 127 private dwellings, a new park, sporting facilities and local roads).
The Government has committed to seeking expressions of interest from the market for the Sydney International Convention and Entertainment Centre (SICEC). The SICEC will be a new international multifunctional convention, entertainment and exhibition facility which will increase the capacity of Sydney’s existing convention, entertainment and exhibition facilities to accommodate increased demand.
     
2 - 8   Infrastructure Statement 2011-12

 


 

Chapter 3: Infrastructure and Service Delivery
3.1 Introduction
This chapter explains how the Government’s $15.3 billion total state sector infrastructure investment in 2011-12 translates into new and improved services for the people of New South Wales by sectoral policy areas.
The policy areas are based on the Australian Bureau of Statistics system of Government Finance Statistics (GFS). This system is designed to provide statistical information on public sector entities classified in a uniform and systematic way.
The GFS based policy framework allows comparisons between Australian states and territories. It also facilitates time series comparisons as the framework is not significantly affected by agency restructures.
GFS policy areas do not always align with individual agency infrastructure expenditure as an agency can provide a range of services that are classified into more than one GFS policy area.
Each policy area includes a high level description of its service delivery objectives and contribution to the achievement of the NSW 2021 Plan and other Government priorities. The major components or agencies contributing to the composition of a policy area are identified.
Overall demand drivers for each policy area are explained. Also included, where relevant, are unique or unusual factors that have influenced the 2011-12 infrastructure investment in a particular policy area.
Each policy area includes details of major infrastructure investment projects being undertaken during the 2011-12 Budget as well as those completed in 2010-11. Details of the service delivery benefits of individual projects are also provided.
3.2 Transport
Infrastructure investment in the transport policy area in 2011-12 is estimated at $6.3 billion, which is $551 million or 9.5 per cent above the 2010-11 Budget. This reflects additional spending on rail (South West Rail Link and commencing the new North West Rail Link) and Sydney ports projects (Intermodal Logistic Centre at Enfield and Passenger Cruise Terminal at White Bay) and on road projects.
     
Infrastructure Statement 2011-12   3 - 1

 


 

The transport policy area is the State’s single largest policy area — accounting for 41.3 per cent of total state infrastructure investment in 2011-12. The policy area includes management and delivery of road infrastructure, the provision of public transport services and the three major ports in state ownership — Port Botany, Newcastle and Port Kembla.
A new integrated transport authority, Transport for NSW, is being established to coordinate service delivery across all modes of transport. The new authority’s work will focus on:
  encouraging greater use of public transport
  providing better, customer-oriented services
  consolidating planning for roads, rail, buses, ferries, taxis and waterways
  developing policies and regulations pertaining to transport across the State
  integrating freight strategies and programs to meet the needs of the State’s economy, particularly in regional areas.
These arrangements will improve the delivery of public transport services and associated major infrastructure projects.
The NSW 2021 Plan includes the following transport goals.
  Reduce travel times.
  Grow patronage on public transport by making it a more attractive choice.
  Improve customer experience with public transport services.
  Improve road safety.
New South Wales has a large and complex transport system. One of the key challenges is to integrate the different modes of transport to create better connectivity that incorporates safe, reliable and efficient transport services that meet customer needs and expectations. Integrating transport and land use planning is also designed to:
  improve access to housing, jobs and services by public transport, cycling and walking to reduce dependence on motor vehicles
  support the efficient and viable operation of public transport services
  provide for the efficient movement of freight.
     
3 - 2   Infrastructure Statement 2011-12

 


 

Rail Services
Infrastructure investment by rail agencies — Rail Corporation New South Wales (RailCorp), the Transport Construction Authority (TCA) and Country Rail Infrastructure Authority (CRIA) — is expected to total $2.2 billion in 2011-12, with a further $222 million for land acquisition for the North West sector. The drivers for this investment include:
  addressing a long-term projection for demand growth linked to growth in the size of Sydney and its level of economic activity — Sydney’s population is anticipated to grow to 5 million by 2020
  improving and maintaining the reliability of the CityRail passenger network — peak on-time running has increased from 63.1 per cent in 2004-05 to 95.2 per cent in 2010-11
  increasing the proportion of total journeys to work by public transport in accordance with NSW 2021 Plan targets
  replacing and upgrading life expired assets.
Major investments in 2011-12 include:
         
Major investments   2011-12 Allocation   Description
South West Rail Link
  $292 million   An 11.4 kilometre twin track extension from Glenfield to Leppington, including two new stations at Edmondson Park and Leppington, upgrade of Glenfield station and new car parking and a train stabling facility to provide new and reliable services for the south west sector of Sydney
 
       
Rail Clearways Program
  $198 million   Continuation of the Kingsgrove to Revesby quadruplication, Richmond line duplication and a new platform at Macarthur station to improve the capacity and reliability of the CityRail network
 
       
Outer Suburban Rail
Carriages
  $130 million   Progressing delivery of 99 new carriages for the outer suburban rail network to provide more reliable rollingstock and capacity to meet future timetable requirements
 
       
Waratah Rail Carriages
Enabling Works
  $106 million   Various works to support the introduction of new Waratah rail carriages including a purpose built training facility, train stabling and interface works to facilitate the running of Waratah rail cars in service
 
       
North West Rail Link
  $314 million   Planning and development work for the new rail link to the North West sector including $222 million for land acquisition
     
Infrastructure Statement 2011-12   3 - 3

 


 

         
Major investments   2011-12 Allocation   Description
Power Supply
  $81 million   Increase the capacity and reliability of the electrical system across the CityRail network
 
       
Commuter Car Parks and Interchanges
  $76 million   Delivery of car parks and interchanges to improve facilities at locations across the CityRail network
 
       
Country Regional Rail
Network
  $66 million   Steel resleepering and bridge renewals to improve the safety, reliability and efficiency of the country regional rail network
 
       
Automatic Train Protection
  $60 million   New on-board safety system in trains to reduce the number of defined safety incidents
 
       
Wynyard Walk
  $51 million   New pedestrian access to the Barangaroo area from Wynyard station to facilitate access to Barangaroo
 
       
Digital Train Radio
  $50 million   Update train radio communications to digital technology to improve network communications
Major projects completed in 2010-11 (with estimated total cost) include:
  Homebush and Lidcombe turnbacks ($103 million), with final commissioning in March 2011
  Easy Access upgrades at Burwood ($16 million), Martin Place ($7.3 million) and St James ($6.5 million) stations
  refurbishment of the XPT trains ($28 million).
Bus Services
All regular passenger bus services in New South Wales are now exclusively delivered through contracts with the Department of Transport. This has enabled the Government, particularly in the metropolitan and outer metropolitan areas, to introduce comprehensive new service plans and to manage a systematic replacement and growth of the bus fleet.
The key drivers for bus purchases include:
  replacing life expired buses
  increasing capacity on key commuter corridors that have experienced strong growth
  the development of new Metrobus services.
Since the commencement of the new contract framework in 2004-05, around 2,000 new buses have been delivered to metropolitan and outer metropolitan operators. This includes around 650 buses to meet increased passenger numbers. The total metropolitan and outer metropolitan fleet is now around 4,700 buses.
     
3 - 4   Infrastructure Statement 2011-12

 


 

The acquisition costs associated with the bus fleet are funded through bus contracts with the Department of Transport and form part of the Department’s capital program.
Major investments in 2011-12 include:
         
Major investments   2011-12 Allocation   Description
Private Operators
  $46 million   104 replacement buses to replace ageing buses and maintain service level to customers
 
       
Bus Depots
  $45 million   New western Sydney depot to accommodate increased fleet size and improve efficiency of bus operations
 
       
State Transit Authority
  $44 million   93 replacement buses to replace ageing buses and maintain service level to customers
 
       
New Services
  $29 million   64 buses to provide new services by private operators and State Transit Authority to provide additional services to customers
Major projects completed in 2010-11 (with estimated total cost) include 565 buses for the State Transit Authority and private operators ($305 million).
Ferry services
The Government announced on 11 May 2011 that it would commence a franchising process for Sydney Ferries as part of the Fixing Sydney Ferries program. This also includes restoring and expanding services and upgrading wharves. A network review is due for completion in 2011 which will provide guidance for any changes to services from 2013. Service plans ensure that ferry timetables are coordinated with Sydney’s bus network.
In 2011-12, $20 million is budgeted for capital improvements on Sydney Ferries fleet and infrastructure. This comprises $12 million for vessel major periodic maintenance, $2.7 million to commence the upgrade of passenger hydraulic ramps at Circular Quay and Manly and $2.8 million for the completion of the ferry operations and customer information system (FOCIS).
     
Infrastructure Statement 2011-12   3 - 5

 


 

Ports
The ports sector comprises Sydney, Port Kembla and Newcastle Port Corporations. Investment in infrastructure in the ports sector will be $389 million in 2011-12.
Sydney Ports Corporation manages Port Botany and various port facilities in Sydney Harbour, which in total handle more than $50 billion in international and domestic trade each year. Port Botany is the second largest container port in Australia by volume, while Sydney Harbour handles passenger cruise vessels and various bulk trades such as cement and sugar.
     
3 - 6   Infrastructure Statement 2011-12

 


 

Port Kembla Port Corporation manages the Port Kembla port which serves the needs of regional industries including trade in coal, steel, iron ore and grain. It also handles the importation of motor vehicles into New South Wales.
Newcastle Port Corporation manages the Port of Newcastle. It is one of the largest coal export ports in the world and also handles trade in grain, fertilisers, ore concentrates, aluminium and steel.
Major investments in 2011-12 include:
         
Major investments   2011-12 Allocation   Description
Intermodal Logistic Centre
  $109 million   Construction of an Intermodal Centre at Enfield to increase the share of container traffic transported by rail into and out of Port Botany
 
       
Port Botany Expansion
  $74 million   Expansion of Port Botany, including construction of a third terminal and associated road and rail works to meet forecast growth in container trade
 
       
Passenger Cruise Terminal at
White Bay 5
  $54 million   Construction of a new passenger cruise terminal at White Bay in Sydney Harbour to replace the existing East Darling Harbour terminal, which will be removed to enable development of the Barangaroo precinct
 
       
Second Bulk Liquids Berth
  $53 million   Construction of a second bulk liquids berth at Port Botany to meet forecast growth in trade
Roads
Investment in roads infrastructure is budgeted at nearly $3.2 billion in 2011-12.
The roads infrastructure program is strongly focussed on meeting the demands of a growing metropolitan area, reinforcing the capacity of the core established network, and the need for increased capacity on major highways.
     
Infrastructure Statement 2011-12   3 - 7

 


 

Major investments in 2011-12 are as follows:
         
Major investments   2011-12 Allocation   Description
Pacific Highway
  $1 billion   Various upgrades to increase length of dual carriageway, part of the current joint funded program with the Australian Government to improve travel times, road safety freight efficiency and traffic conditions on the Pacific Highway
 
       
Hunter
  $627 million   Hunter Expressway (F3 to Branxton) in conjunction with the Australian Government and various other upgrades in the Hunter to cut travel times between Newcastle and the Hunter and relieve congestion and reduce traffic on the New England Highway, east of Branxton and various other upgrades in the Hunter
 
       
Hume Highway
  $250 million   Continued work on the Holbrook, Tarcutta and Woomargama bypasses to improve safety and convenience for motorists and local residents by removing cars and heavy vehicles from local streets and to improve the efficiency of freight movements along the Hume Highway
 
       
Sydney Region
  $208 million   M2, M5 and F5 motorway upgrades to increase capacity and improve travel times and safety for local and long-distance traffic, along with ANZAC Bridge structural improvements, bus priority lanes on strategic corridors and the Erskine Park Link Road
 
       
Great Western Highway
  $142 million   Various upgrades to increase length of dual carriageway to improve travel times as well as providing a safer road environment for all motorists, pedestrians and cyclists
 
       
Princes Highway
  $82 million   Gerringong upgrade, South Nowra duplication, Victoria Creek realignment and the Bega bypass to improve road safety, reduce travel times and vehicle operating costs and to improve noise and air quality
     
3 - 8   Infrastructure Statement 2011-12

 


 

         
Major investments   2011-12 Allocation   Description
Central Coast
  $61 million   Continued widening of the Central Coast Highway between Erina and Wamberal to provide a major improvement in traffic capacity, improved road safety and better facilities for bus passengers, cyclists and pedestrians
     
Infrastructure Statement 2011-12   3 - 9

 


 

Major projects completed in 2010-11 (with total estimated cost) include:
  Pacific Highway, Moorland to Herons Creek dual carriageway ($378 million, joint funded)
 
  Pacific Highway, Ballina Bypass Stage 1 (part of the overall project valued at $640 million, joint funded)
 
  Main Road 92 upgrade between Nowra and Nerriga ($99 million, joint funded)
 
  F5 Freeway widening to eight lanes between Brooks Road, Ingleburn and the Campbelltown ramps (part of an overall project valued at $116 million, joint funded)
 
  Hunter River third crossing at Maitland ($59 million)
 
  Cowpasture Road widening to four lanes between the M7 Motorway and North Liverpool Road ($53 million), which completed the Cowpasture Road upgrade program.
3.3 Electricity
Infrastructure investment in the electricity sector in 2011-12 is estimated at $4 billion, which is $86 million or 2.2 per cent above the 2010-11 Budget. The increase is primarily driven by increased investment in electricity distribution networks to accommodate continued growth in demand, particularly peak demand, and to renew existing assets. The electricity sector represents 26.1 per cent of total state infrastructure investment in 2011-12.
Power generation is the first stage of delivering a reliable electricity supply to NSW households, industry and businesses. The drivers for investment in generation are the growing demand for electricity, the need to replace or refurbish power station plant and the need to reduce the environmental footprint of generation. The Government has initiated a review to ensure all planned spending is justified.
Electricity transmission provides the high voltage network to convey electricity from the power stations to the lower voltage distribution networks throughout New South Wales.
Distribution to end-use customers through the ‘poles and wires’ is the final stage of the electricity supply chain. The distribution system also progressively reduces the voltage of electricity from the high voltage transmission network to voltages suitable for use in households and businesses.
The main drivers for investment in electricity transmission and distribution are:
  growth in customer numbers (requiring new infrastructure in population growth areas, particularly in north west and south west Sydney and the north coast of New South Wales)
  increasing summer peak demand
  augmentation of existing assets to increase their capacity to accommodate growth
  replacement or refurbishment of ageing assets at the end of their economic life.
     
3 - 10   Infrastructure Statement 2011-12

 


 

As part of its Energy Reform Strategy, the previous Government sold the electricity retailing businesses of Energy Australia, Integral Energy and Country Energy, some new development sites and contracts for the output of some of the state owned generation businesses (commonly referred to as the gentrader model) in December 2010. Further information is provided in Budget Paper 2.
A range of electricity assets remain in state ownership, including the transmission assets managed by TransGrid, and the distribution assets managed by the rebranded Ausgrid, Essential Energy and Endeavour Energy. Generation assets belonging to Eraring Energy and Delta Electricity (West) remain in state ownership, but the energy output has been contracted to retailers under the gentrader model. The assets and rights to output of Macquarie Generation and Delta Electricity (Coast) remain in state ownership.
The NSW Government has established a Special Commission of Inquiry into the former Government’s electricity transactions. This is to include options for future action that could be undertaken to further public interest in a competitive NSW electricity sector.
Generation
The three generation businesses Delta Electricity, Macquarie Generation and Eraring Energy generate most of the electricity consumed in New South Wales. The balance is provided by Snowy Hydro or privately owned generators, or is imported from interstate through transmission interconnectors.
In December 2010 Eraring Energy entered into a Generation Trading (gentrader) Agreement for the existing generating capacity of its Eraring and Shoalhaven power stations with Origin Energy. Delta Electricity entered into a gentrader agreement for its Mount Piper and Wallerawang power stations with TRUenergy. Under these agreements, Origin and TRUenergy are responsible for most capital expenditure at the gentrader power stations. Further information is provided in Budget Paper 2.
In 2011-12 the three generation businesses will invest $88 million to maintain the operating capacity of existing assets and expand the capacity of existing power stations in order to maintain reliability and meet increasing demand for electricity across New South Wales.
     
Infrastructure Statement 2011-12   3 - 11

 


 

Major investments in 2011-12 include:
         
Major investments   2011-12 Allocation   Description
Delta Electricity Infrastructure Investment at Power Stations not Related to the Generation Trading Agreements
  $40 million   Investments include a program of works at Vales Point power station on the Central Coast aimed at optimising the efficiency and reliability of existing operations. The most significant project in this program is an upgrade of turbine blades.
 
       
Macquarie Generation
Infrastructure Investment
  $40 million   Infrastructure investment includes ash hopper replacement work at Liddell power station aimed at improving plant performance and eliminating a safety risk, expansion of Liddell’s thermal solar plant which pre-heats water for electricity generation, and continuation of the upgrade of the secondary air heater baskets at Liddell to improve plant performance.
 
       
Eraring Energy Infrastructure Investment at Power Stations not Related to the Generation Trading Agreements
  $8 million   Major investments include a program of works to maintain the reliability of existing operations.
Transmission
TransGrid is the owner, operator and manager of one of the largest high voltage transmission networks in Australia, connecting generators, distributors and major end users in New South Wales. TransGrid’s network also links to the transmission networks in Queensland and Victoria, giving New South Wales the capability to export electricity to, or import electricity from, those states. TransGrid has a network comprising almost 12,500 kilometres of high voltage transmission line and underground cables as well as 91 substations and switching stations.
     
3 - 12   Infrastructure Statement 2011-12

 


 

Investment in infrastructure by TransGrid in 2011-12 is estimated at $523 million and includes:
         
Major investments   2011-12 Allocation   Description
Western Sydney Supply
Project
  $93 million   New substations, underground 330kV cables and 330kV transmission line augmentation to increase the capacity of the transmission network in the metropolitan area to accommodate the growing electricity needs of Western Sydney
 
       
Substations
  $55 million   132kV substations at Wallerawang and Orange North
 
       
Transmission Lines
  $53 million   132kV transmission lines including between Manildra-Parkes, Glen Innes-Inverell, Kempsey-Port Macquarie and Tomago-Stroud
 
       
Technology Improvements
  $52 million   Technology including Sydney West control room replacement, secondary system replacements and upgrades to the communications and optical fibre network
 
       
330kV Substation
Redevelopment
  $43 million   Beaconsfield West 330kV substation redevelopment to secure the power supply of Sydney’s inner metropolitan area
 
       
Switchyard Refurbishment
  $30 million   Switchyard refurbishment at Murray and Upper Tumut and transformer replacements at Munyang
Distribution
Ausgrid’s electricity network services Sydney’s CBD, eastern suburbs, northern suburbs, southern suburbs and inner western suburbs. The network also services the Central Coast, Newcastle, the Hunter Valley and areas in the northern hinterland from Newcastle.
Investment in infrastructure by Ausgrid in 2011-12 is estimated at $1.8 billion and includes:
         
Major investments   2011-12 Allocation   Description
Transmission and Zone Substations
  $358 million   Substations to provide capacity, meet licence conditions, replace aged assets and meet forecast load growth in the medium to long term including new substations at Belmore Park, Hurstville North, Engadine, Empire Bay, Broadmeadow and Charlestown, and replacement and upgrade of North Sydney zone substation and Canterbury sub-transmission substation
     
Infrastructure Statement 2011-12   3 - 13

 


 

         
Major investments   2011-12 Allocation   Description
Cables
  $280 million   New and replacement 132kV, 66kV and 33kV cables to maintain network reliability performance, including feeder cables between Peakhurst-Bunnerong, Peakhurst-Beaconsfield West and Mason Park-Rozelle
 
       
Distribution Centre
Renewals
  $177 million   Essential renewal of distribution centres and replacement of distribution mains and services that have reached the end of their useful life across Ausgrid’s network
 
       
11kV Network
  $105 million   Development of the Ausgrid 11kV network
 
       
Substation Augmentation
  $90 million   Augmentation of distribution substations and the low voltage distribution network across Ausgrid’s network to accommodate growth in the demand for electricity
 
       
Substation Equipment
  $75 million   Replacement of substation equipment including 132kV and 33kV circuit breakers, 11kV switchgear, replacement and refurbishment of transmission towers and poles, protection equipment and other systems
 
       
New Cable Tunnel
  Over $30 million   Preliminary work for a new cable tunnel in the Sydney CBD
Essential Energy operates Australia’s largest distribution network covering approximately 95 per cent of New South Wales. It supplies electricity to regional centres, rural customers and remote communities. Essential Energy’s network extends over diverse geography from the coast to the outback and encompasses a wide range of climatic conditions.
Investment by Essential Energy in 2011-12 is estimated at $917 million and includes:
         
Major investments   2011-12 Allocation   Description
Substations
  $60 million   New substations at Halliday’s Point, Tea Gardens, Uranquinty, Gundagai, Morven, Suffolk Park and Inverell
 
       
Subtransmission Lines
  $53 million   Subtransmission lines including under grounding 2.4 km of 132kV line at Ewingsdale and re-insulating lines between Mullumbimby-Ballina, Yarrandale-Gilgandra and Beryl-Dunedoo
     
3 - 14   Infrastructure Statement 2011-12

 


 

         
Major investments   2011-12 Allocation   Description
Transmission Lines
  $40 million   Transmission lines including a second line between Dubbo-Yarrandale, Deniliquin-Moama, and a new line from Forbes to West Jemalong
 
       
Substation Support Assets
  $16 million   Install reactive support assets within 21 zone substation sites
Endeavour Energy’s distribution network services the outer western suburbs of Sydney, the Illawarra, the Blue Mountains, and the Southern Highlands. The growth centres in north west and south west Sydney are located in Endeavour Energy’s network.
Investment in infrastructure by Endeavour Energy in 2011-12 is estimated at $674 million and includes:
         
Major investments   2011-12 Allocation   Description
Zone Substation
  $278 million   Works undertaken at Parramatta, Casula, Camden, Schofields, Wilton Park, Granville, Doonside, Cheriton Avenue, Canley Vale and Chipping Norton
 
       
Capital Refurbishment
  $134 million   Refurbishment of the distribution network to maintain reliability as network demand grows
 
       
Transmission Substations
  $79 million   New transmission substations being established at Liverpool, West Tomerong and Guildford
 
       
High Voltage Distribution
Network
  $34 million   Augmentation and development of the high voltage distribution network
3.4 Education and Training
Infrastructure investment in the education and training policy area in 2011-12 is estimated at $740 million. This includes $221 million in school education services infrastructure for the Australian Government’s Building the Education Revolution Primary Schools for the 21st Century program. The education and training policy area represents 4.8 per cent of the total state investment in infrastructure.
Investment falls in 2011-12 by $1 billion with the near completion of large infrastructure investment under the Nation Building — Economic Stimulus Plan — Building the Education Revolution program announced in February 2009.
     
Infrastructure Statement 2011-12   3 - 15

 


 

Education and training infrastructure investment provides the best possible environment in public schools and Technical and Further Education (TAFE) facilities to enable student learning, provide support for teachers and deliver the workforce skills required by employers. These investments contribute to the delivery of NSW 2021 Plan goals.
  Improve education and learning outcomes for all students.
  Strengthen the NSW skill base.
An important factor that drives investment in school infrastructure is the ongoing growth of Sydney and NSW regional areas, the movement of families within residential areas and the changing total number of students. Looking forward, student numbers are forecast to increase gradually in the medium to longer term. New schools will need to be provided, while existing schools may need to expand in some areas.
School investment is also driven by the Government’s commitment that education is accessible to all students, with facilities suitable for educating and supporting students with a range of special needs and geographic, economic, social or cultural disadvantage.
A commitment to expand new technologies into school classrooms and into TAFE institutes also drives infrastructure investment.
This policy area includes school education services at more than 2,200 government schools and TAFE education services at 130 campuses across the State. These facilities require ongoing spending on maintenance and building upgrades.
School Education Services
Investment in school education services infrastructure by the Department of Education and Communities in 2011-12 is estimated at $640 million. This is $1.3 billion or 67 per cent below the 2010-11 Budget, which included $1 billion due to the Nation Building - Economic Stimulus Plan funding.
Major investments in 2011-12 include:
         
Major investments   2011-12 Allocation   Description
Seven Major New Building
Projects in Schools
  $6 million   Upgrades and additions at four school locations to maintain suitable school facilities, a new school for special purposes at Bass Hill and a new school at Oran Park to meet growth in student need
     
3 - 16   Infrastructure Statement 2011-12

 


 

         
Major investments   2011-12 Allocation   Description
Continuing 36 Major Building Projects and Three Information Technology Projects
  $105 million   Upgrades and additions at 27 schools and other locations to maintain suitable school facilities including new halls and gyms, the completion of the Connected Classrooms program, works at schools for special purposes at Arncliffe, Epping, Hornsby and Newcastle, and upgrade at Casino Public School
 
       
Continuing Three Projects for the Learning Management and Business Reform Project
  $78 million   Upgrade and replacement of the information management systems for finance, human resources, payroll and student administration
 
       
Building the Education
Revolution (Primary
Schools for the
21st Century)
  $221 million   Remaining projects at schools including new classrooms, libraries, halls and canteens for the Nation Building — Economic Stimulus Plan
 
       
Trade Training Centres
  $49 million   Improving training facilities and increasing the number of courses available for secondary students
 
       
School Minor Works
  $180 million   Upgrades of student and teacher facilities, disabled access in schools, and new technology and computers across many schools to improve student and teacher amenity
Major projects completed in 2010-11 (with estimated total cost) include:
  17 school projects including refurbished teaching and learning facilities, new halls and gyms, and trade training facilities, including major upgrades at Coffs Harbour, Chatswood, Tumut and Hazelbrook ($90 million).
TAFE Education Services
Investment in TAFE education services infrastructure by the Department of Education and Communities in 2011-12 is estimated at $98 million, which is $17 million or 15 per cent below the 2010-11 Budget.
Major investments in 2011-12 include:
         
Major investments   2011-12 Allocation   Description
Nine Major New TAFE Building Projects and One New Information Technology Project
  $6 million   Various upgrades and additions at nine TAFE locations, including facilities at Kingscliff, Tamworth and Maitland to support the enhancement of workforce skills of students
     
Infrastructure Statement 2011-12   3 - 17

 


 

         
Major investments   2011-12 Allocation   Description
Continuing 21 Major TAFE
Projects
  $62 million   Upgrades and additions at 14 TAFE campuses and other locations, including Ultimo and Wollongong, and a Learning Management and Business Reform project
 
       
TAFE Minor Works
  $30 million   Upgrades of facilities across many TAFE campuses to improve student and teacher amenity
     
3 - 18   Infrastructure Statement 2011-12

 


 

Major projects completed in 2010-11 (with estimated total cost) include:
  14 TAFE projects providing upgraded teaching and learning facilities at colleges, including major upgrades at Randwick, Macquarie Fields and Hamilton and upgrades funded by the Australian Government’s Education Investment Fund ($71 million).
3.5 Housing
Infrastructure investment in the Housing policy area in 2011-12 is estimated at $564 million, which is $657 million or 53.8 per cent below the 2010-11 Budget. The reduction is mainly related to the Nation Building Economic — Stimulus Plan — Social Housing program as explained below. The housing policy area represents 3.7 per cent of the total state investment in infrastructure.
This investment is undertaken by agencies including the NSW Land and Housing Corporation, the Aboriginal Housing Office, City West Housing Pty Limited, the Teacher Housing Authority and Landcom.
The Government’s investment in social and affordable housing supports the delivery of the NSW 2021 Plan goals.
  Better protect the most vulnerable members of our community and break the cycle of disadvantage.
  Increase opportunities for people with disabilities to gain access to support that meets their individual needs and realises their potential.
Social housing investment is influenced by an increasing number of clients with disabilities or complex health needs, changing demographics including an increased proportion of smaller households, an ageing population and a shift in population to the metropolitan and coastal areas of the State.
Social Housing
Investment in infrastructure by the NSW Land and Housing Corporation in 2011-12 is estimated at $449 million, which is $650 million or 59.1 per cent below the 2010-11 Budget. The near completion of the large infrastructure investment under the Nation Building — Economic Stimulus Plan — Social Housing program in 2010-11 means that investment under this program is more than $600 million lower than the previous year. In 2010-11 a total of 5,412 new social housing dwellings had been delivered under the program. An additional 917 new dwellings remain to be completed in 2011-12, bringing the total social housing dwellings built under this program to 6,329.
 
Infrastructure Statement 2011-12   3 - 19


 

The NSW Land and Housing Corporation is the largest provider of social housing in Australia and a major Governm ent asset holder, with a property portfolio of around 131,400 homes and a capital value of $30.9 billion. Further housing assistance is provided through 9,285 leasehold properties.
The priority areas for social housing infrastructure investment by the NSW Land and Housing Corporation include:
  supplying social housing in line with the Planning for the Future target of growing the community housing sector from 13,000 in 2007-08 to 30,000 properties by 2017-18
  addressing concentrations of social disadvantage to integrate social housing and clients into the community
  meeting social housing needs through maintaining the condition of the portfolio as well as responding to changes in demand.
The Aboriginal Housing Office plans and administers policies and programs for Aboriginal-specific social housing. The 2011-12 investment in infrastructure will provide 71 new social housing dwellings available to Aboriginal people through the Office and Aboriginal community housing providers.
City West Housing was established in 1994 to build and manage affordable housing within the City of Sydney. City West Housing will commence two new major projects in 2011-12 at a cost of $76 million for completion in 2014-15.
The Teacher Housing Authority provides for the construction, acquisition and upgrading of housing in remote areas of the State where private rental markets do not adequately meet teacher accommodation needs.
Major investments in 2011-12 include:
         
Major investments   2011-12 Allocation   Description
 
Social Housing New Supply
Program*
  $222 million   Commencement of 529 and completion of 1,072 social housing dwellings by the NSW Land and Housing Corporation
 
       
Upgrading of Existing Public and Community Housing
  $195 million   A combination of planned work and improvements to maintain the portfolio to a predetermined standard including modifications to dwellings to satisfy tenant accommodation requirements
 
       
Nation Building -Economic
Stimulus Plan -Stage 2
  $48 million   Completion of 917 new dwellings bringing the total number of properties delivered under the Stimulus Plan program to 6,329 dwellings*
 
*   Funded by GST refund associated with the vesting of properties to community housing provides under the Stimulus Plan program.
 
3 - 20   Infrastructure Statement 2011-12


 

         
Major investments   2011-12 Allocation   Description
 
Riverwood North Urban
Renewal Project*
  $25 million   Demolition of 176 existing social housing dwellings to develop up to 650 new dwellings, consisting of 150 seniors living units and up to 500 private, affordable and community housing units
 
       
Building Stronger
Communities Program
  $18 million   The NSW Land and Housing Corporation’s Building Stronger Communities program aims to improve the quality of the built and social environment and access to services and opportunities for social housing tenants in seven priority locations (Mt Druitt, Claymore, Macquarie Fields, Killarney Vale/Bateau Bay/Tumbi Umbi, Bathurst/Orange, Dubbo and Wagga Wagga).
 
       
National Partnership
Aboriginal Housing -
New Supply
  $17 million   The Aboriginal Housing Office will deliver 35 new dwellings for Aboriginal people in remote areas under the National Partnership Agreement on Remote Indigenous Housing.
 
       
Aboriginal Housing -
New Supply
  $13 million   The Aboriginal Housing Office will deliver 30 new dwellings for Aboriginal people across New South Wales under its new supply program.
 
       
Affordable Housing -
Green Square
  $13 million   City West Housing will commence the construction of 120 affordable housing units at a total cost of $44 million.
 
       
Teacher Accommodation
  $9 million   Construction, acquisition and upgrading of 32 additional dwellings in rural and remote areas by the Teacher Housing Authority to meet teacher accommodation needs
 
       
Cowper Street Glebe Redevelopment*
  $4 million — City West Housing

$1 million — Land and Housing Corporation
  Commence a $45 million redevelopment project within the Glebe estate (currently containing 134 existing dwellings) to provide 250 market dwellings, 90 affordable housing dwellings (to be delivered by City West Housing) and 153 social housing dwellings (to be provided by the NSW Land and Housing Corporation)
 
       
National Partnership
-Employment Related
Accommodation
  $3 million   The Aboriginal Housing Office will deliver six new dwellings for Aboriginal people from remote areas pursuing job and training opportunities under the National Partnership Agreement on Remote Indigenous Housing.
 
       
New Office
Accommodation
  $3 million   New office accommodation for Landcom
 
*   Includes social housing dwellings to be delivered under the Riverwood North Urban Renewal project and Cowper Street Glebe Redevelopment project.
 
Infrastructure Statement 2011-12   3 - 21

 


 

Major projects completed in 2010-11 (with estimated total cost) include:
  upgrade and improvements of existing social housing ($256 million) including $30 million for the conversions of 315 bed-sit accommodation under Nation Building - Economic Stimulus Plan
 
  completion of 106 new dwellings in Redfern ($37 million), 88 new dwellings in Lilyfield ($28 million) and 48 new dwellings in Abbottsford ($13 million) under the NSW Land and Housing Corporation’s new supply program
 
  completion of 18 new employment related accommodation ($8.8 million) and 39 new dwellings in remote areas of New South Wales ($23 million) under the National Partnership Agreement on Remote Indigenous Housing
 
  fire protection upgrades to 4,755 existing dwellings of the NSW Land and Housing Corporation under the Fire Safety Upgrade Program ($18 million)
 
  completion of 27 new dwellings ($14 million) under the Aboriginal Housing Office capital works program.
3.6 Health
Infrastructure investment in the Health policy area in 2011-12 is estimated at $925 million. The policy area represents 6 per cent of the total state investment in infrastructure.
The Health policy area includes NSW Health, the Cancer Institute and the Health Care Complaints Commission.
Investment in infrastructure in the health policy area includes hospitals, health facilities, medical equipment, health technology including linear accelerators and magnetic resonance imaging (MRI) for the diagnosis and treatment of disease, as well as clinical and operational ICT systems to enable health and medical staff to deliver effective health care to the population of New South Wales. Infrastructure investment also contributes to achieving the following key health-related goals of the NSW 2021 Plan.
  Keep people healthy and out of hospital.
  Provide world class clinical services with timely access and effective infrastructure.
Pressure from an ageing and growing population, rising community expectations and availability of new health technologies generates increasing demand for new infrastructure, facilities, information systems and health and medical technologies.
 
3 - 22   Infrastructure Statement 2011-12


 

NSW Health
Health’s capital works program in 2011-12 is over $1 billion and includes capital expenditure of $921 million and $161 million in recurrent expenditure on the capital works program including capital grants of $6 million for Neuroscience Research Australia, $10 million for the Australian Advanced Treatment Centre at Prince of Wales Hospital, $20 million for the Children’s Medical Research Institute, Westmead and $25 million for the Westmead Millennium Institute. The total capital works program of over $1 billion in 2011-12 is $67 million or 7 per cent higher than the capital works program announced in the 2010-11 Budget.
The total capital works program, over four years from 2011-12, is $4.7 billion, including $672 million for the Royal North Shore PPP. This is 50 per cent higher than the value of the capital works program undertaken over the previous four years to 2010-11.
The total value of capital projects commencing in 2011-12 is over $1.3 billion and includes investment in the New South Wales Government’s election commitments. The NSW Government, together with the Commonwealth through the Health and Hospitals Fund, will also invest $850 million over four years to progress development of South East Regional Hospital, Bega and redevelopment of Dubbo Base, Port Macquarie Base, Tamworth Regional Referral and Wagga Wagga Base hospitals. Other major works commencing in 2011-12 include Prince of Wales Cancer and Blood Disorder Unit, Campbelltown Macarthur Hospital redevelopment and St George Hospital Emergency Department, and expansion of the planned Royal North Shore Hospital Clinical Services Building to include additional inpatient capacity of 60 beds.
Funding to progress planning, design and documentation has been allocated this year for the remaining NSW Government election commitments, including Lachlan Health Service (Parkes and Forbes hospitals), Illawarra-Shoalhaven services (Shellharbour and Shoalhaven hospitals), Blacktown and Hornsby Ku-ring-gai hospitals and the new Northern Beaches Hospital. These projects are funded to commence their construction within the forward estimates.
In addition, funding has been provided for planning and land acquisition for the Hunter Valley Hospital and planning for the Northern NSW hospital services (Lismore and Byron Bay) and local hospital upgrades at Ryde, Gulgong, Mona Vale, Woy Woy and Wyong.
The Health component of $33 million from the Hunter Infrastructure and Investment Fund will result in upgrades and equipment replacement at Cessnock, Maitland, Kurri Kurri and Wansey and acquisition of land at Waratah.
 
Infrastructure Statement 2011-12   3 - 23


 

Expenditure in 2011-12 on major new investments includes:
         
Major investments   2011-12 Allocation   Description
 
Metropolitan Sydney Health and Hospital Services
  $64 million   Commence construction of Royal North Shore Hospital Clinical Services Building including co-location of mental health services and additional inpatient capacity of an extra 60 beds, Campbelltown Macarthur Hospital Redevelopment and Graythwaite Rehabilitation Centre at Ryde

Commence upgrade of cancer services at Prince of Wales Hospital, Emergency Department at St George Hospital, maternity services at Mona Vale Hospital and a foreshore walk at Concord Hospital

Planning or design and documentation for projects at Blacktown Hospital, Hornsby Ku-ring-gai Hospital, Northern Beaches Hospital, Wyong Hospital, Woy Woy Hospital, mental health services at Royal Prince Alfred Hospital, Ryde Hospital, Bundeena Ambulance Station, Illawarra-Shoalhaven hospitals (Shellharbour Hospital expansion and car parking at Shoalhaven Hospital), and Ambulance Service infrastructure
 
       
Rural and Regional Health Services
  $90 million   Commence the planning or development of South East Regional Hospital Bega, Dubbo Base Hospital, Port Macquarie Base Hospital, Tamworth Rural Referral Hospital, Wagga Wagga Base Hospital, and Multipurpose Services at Braidwood and Gulgong

Planning for Maitland Mental Health Carer’s room, Cessnock Hospital emergency department upgrade, Lachlan Health Service (Parkes and Forbes hospitals), and hospitals in Northern NSW (Lismore and Byron Bay) and the Hunter Valley

New equipment for Dubbo Blood Bank, Cooma Dialysis service, Wansey Dialysis Unit, Cessnock Hospital and Kurri Kurri Hospital
 
       
Information and Communication Technology
  $37 million   Commence the delivery of a number of major e-health projects including commencing the statewide electronic medications management program, continuing the rollout of electronic medical records to all clinical specialties and intensive care units, and performing critical ICT infrastructure upgrades
 
3 - 24   Infrastructure Statement 2011-12


 

         
Major investments   2011-12 Allocation   Description
 
Health Technology Program
  $8 million   Establish PET-CT service at the Randwick campus (Prince of Wales), a Special Imaging Suite at Nepean Hospital and CT scanner at Liverpool Hospital
 
       
Local Initiatives Program
  $89 million   Local Initiative projects funded by Health Services to meet locally identified infrastructure needs such as minor refurbishments or equipment upgrades based on local service delivery priorities
Major projects completed in 2010-11 (with estimated total cost) include:
  Orange-Bloomfield Redevelopment (including PPP) ($260 million)
 
  Grafton Surgical Services and Emergency Department ($20 million)
 
  Balranald Multipurpose Service ($16 million)
 
  Coonamble Multipurpose Service ($15 million)
 
  Auburn Hospital Community Hub ($14 million)
 
  Maitland Hospital Emergency Department ($10 million)
 
  cardiac catheterisation service and Simulation Centre at Blacktown Hospital ($9 million)
 
  James Fletcher Hospital Newcastle — 20-bed unit ($8.9 million)
 
  Nelson Bay Ambulance Station ($2.2 million).
3.7 Environment and Natural Resources
Infrastructure investment in the environment and natural resources policy area in 2011-12 is estimated at $656 million, which is 14.6 per cent below the 2010-11 Budget. The environment and natural resources policy area represents 4.3 per cent of the total state investment in infrastructure.
The greatest share of investment in this sector comprises wastewater projects, which are principally undertaken by Sydney Water Corporation and Hunter Water Corporation. Wastewater infrastructure protects the environment by ensuring waste water is treated to minimise impact on rivers, harbours and the ocean.
Other significant areas of investment are the purchase of water entitlements to secure water for the environment, the acquisition of land for inclusion in the national parks system, and capital maintenance and facilities upgrades in national parks. These investments support the NSW 2021 Plan goal: protect our natural environment.
 
Infrastructure Statement 2011-12   3 - 25


 

The reduction in total investment in the environment and natural resources policy area from 2010-11 primarily reflects the absence of capital expenditure on waste management infrastructure following the sale of WSN Environmental Solutions and a lower level of capital investment for the Hunter Water Corporation in 2011-12 in line with its IPART approved price path.
Wastewater
Projects in this category focus on upgrades of wastewater transport systems and treatment plants by Sydney Water Corporation and Hunter Water Corporation.
In 2011-12, total expenditure on wastewater projects is estimated at $514 million and includes:
         
Major investments   2011-12 Allocation   Description
 
Growth Works to Service Urban Development
  $146 million   Wastewater system and sewerage treatment plant works to service new urban development in Sydney’s north west and south west growth centres
 
       
Sewerage Treatment Plants
  $75 million   Upgrades to ensure reliability of treatment plants and to provide capacity for the growing Lower Hunter population
 
       
Sewer Overflow Abatement
  $72 million   Upgrades to reduce adverse impacts on Hunter Water customers and the environment from the wastewater system in wet weather
 
       
Sewer Network Upgrades
  $72 million   Upgrades to reduce maintenance and risk costs, and minimise the life cycle cost of assets
 
       
Priority Sewerage Program
— Appin
  $41 million   Construction of the Appin sewerage scheme which is part of the Government’s Priority Sewerage Program
 
       
Priority Sewerage Program — Freemans Reach, Glossodia and Wilberforce
  $11 million   Construction of the Freemans Reach, Glossodia and Wilberforce sewerage scheme, which is part of the Government’s Priority Sewerage Program
 
       
Toronto Wastewater
Treatment Inlet Upgrade
  $6 million   Upgrade to the inlet of Toronto Wastewater Treatment Works to ensure the inlet works operate reliably and have capacity to meet future projected flows
Major projects completed in 2010-11 (with estimated total cost) include:
  the Hawkesbury Heights — Yellow Rock Sewerage Scheme ($50 million)
 
  the Londonderry — Agnes Banks Sewerage Scheme ($25 million).
 
3 - 26   Infrastructure Statement 2011-12

 


 

Environment
Investment in infrastructure by the Department of Premier and Cabinet on environment and natural resources in 2011-12 is estimated at $56 million. This expenditure is undertaken through the Office of Environment and Heritage, a division of the Department of Premier and Cabinet.
Major investments in 2011-12 include:
         
Major investments   2011-12 Allocation   Description
 
Maintain Reserve System
Infrastructure
  $28 million   Essential works, repair/replacement and maintenance for capital items in national parks and reserves
 
       
Reserve Acquisition
  $6 million   Purchase of land to improve comprehensiveness, adequacy and representativeness of the reserve system
 
       
Environmental Water
  $6 million   Purchase of water under the RiverBank program for environmental purposes
 
       
Kosciuszko National Park
  $4 million   Upgrade of roads and waste transfer station at Perisher Valley to improve public access and effective waste removal
 
       
Parks and Wildlife Radio Network
  $2 million   Continuing program to replace radio equipment to ensure effective communication for fire fighting and park management
 
       
Satellite Imagery
  $2 million   Upgrade of satellite imagery to improve environmental monitoring and compliance
 
       
Parks and Wildlife Website
  $1million   Upgrade of website to improve access and online booking system
Agriculture, Forests and Fisheries
The Department of Trade and Investment, Regional Infrastructure and Services 2011-12 infrastructure investment on agriculture and fisheries is $46 million.
Forests NSW operates as a separate Government business within the Department of Industry and Investment. In 2011-12, Forests NSW is expected to invest $13 million.
 
Infrastructure Statement 2011-12   3 - 27

 


 

Major investments in 2011-12 include:
         
Major investments   2011-12 Allocation   Description
 
Forests NSW
  $13 million   Building maintenance, plant and equipment, construction of roads and bridges
 
       
Elizabeth Macarthur
Agricultural Institute
  $12 million   Biosecurity upgrade to ensure the Institute is prepared to deal with biosecurity threats
 
       
Gosford Horticultural
Institute
  $3 million   Relocation of the Institute
 
       
Fisheries
  $2 million   Commercial Fisheries Management System
 
       
Biosecurity
  $2 million   Biosecurity Information Management System to improve capacity to deal with biosecurity threats
 
       
Plant and Equipment
  $2 million   Earth moving equipment replacement
3.8 Water
Infrastructure investment in the water sector in 2011-12 (excluding wastewater) is estimated at $487 million, which is $40 million or 7.6 per cent below the 2010-11 Budget. The water sector represents 3.2 per cent of the total state investment in infrastructure.
State infrastructure investment in the water sector is undertaken by four Government businesses.
  Sydney Water Corporation — delivers essential water services to 4.3 million people in Sydney, the Illawarra and the Blue Mountains.
 
  Sydney Catchment Authority — manages a network of 11 major dams and other water supply infrastructure and protects 16,000 square kilometres of drinking water catchments surrounding the dams in order to supply high quality water to Sydney Water, councils and other customers.
 
  Hunter Water Corporation — is a vertically integrated bulk and retail water and wastewater business servicing the Lower Hunter region.
 
  State Water Corporation — captures, stores and releases bulk water for irrigation, town water supply and the environment along 7,000 kilometres of rivers in regional New South Wales.
Urban water and wastewater services in the rest of regional New South Wales (including the Central Coast) are the responsibility of local water utilities.
The State’s water investment activities are shaped by the NSW 2021 Plan goal: secure potable water supplies.
 
3 - 28   Infrastructure Statement 2011-12

10


 

Key investment initiatives associated with this priority include investment in new water infrastructure to service a growing population, renewal of existing water supply and storage assets and expenditure to meet modern day dam safety standards.
Sydney Water and Sydney Catchment Authority operate within the context of the Metropolitan Water Plan 2010. The plan focuses on four main areas to secure water for life.
  Dams — includes long-term plans to augment the Shoalhaven water supply transfer system.
 
  Recycling — future large-scale water recycling schemes will be delivered in Sydney’s west as population grows.
 
  Desalination — up to 15 per cent of Sydney’s water needs will be provided through desalination.
 
  Water efficiency — existing water efficiency programs will continue to be offered to the community to save water in homes and businesses.
Sydney, the Illawarra and the Blue Mountains
Investment in infrastructure by Sydney Water in 2011-12 is estimated at $278 million and includes:
         
Major investments   2011-12 Allocation   Description
 
Maintaining Water
Distribution Systems
  $138 million   The maintenance of water distribution and treatment systems includes the renewal of critical water reticulation mains, installing flow meters and pressure management works, renewal of water pumping stations and water filtration plants and reliability upgrades of reservoirs.
 
       
Recycled Water Projects
  $29 million   Includes major new recycled water services at Hoxton Park
 
       
Western Sydney Recycled
Water Initiative
  $4 million   The Western Sydney Recycled Water Initiative will release highly treated recycled water to the Hawkesbury-Nepean River, replacing up to 18 billion litres of water a year released from Warragamba Dam for environmental flows.
In 2011-12, investment in water infrastructure by Sydney Catchment Authority is estimated at $21 million and is primarily aimed at the construction and renewal of assets that are used to collect, store and deliver raw water to customers.
 
Infrastructure Statement 2011-12   3 - 29

 


 

Major investments in 2011-12 include:
         
Major investments   2011-12 Allocation   Description
 
Shoalhaven System Upgrade
  $6 million   Upgrading the Shoalhaven System to meet standards and ensure optimum serviceable life of assets. Expenditure is principally work to meet dam safety requirements at Wingecarribee Dam
 
       
General Upgrades of Assets
  $4 million   General upgrades of dams and other assets to ensure safety and reliability
 
       
Warragamba Dam
  $1 million   Completion of measures to ensure crest gates are capable of withstanding a Probable Maximum Flood event and completion of refurbishment of the overhead crane
Major projects completed in 2010-11 (with estimated total cost) include:
  Warragamba Dam Precinct Upgrade ($7 million)
 
  Tallowa Dam Environment Flows and Fishway ($31 million).
The Hunter
Investment in water infrastructure by Hunter Water in 2011-12 is estimated at $49 million.
Major investments in 2011-12 include:
         
Major investments   2011-12 Allocation   Description
 
Enhancement of Water Infrastructure
  $17 million   Upgrade and maintenance of existing water infrastructure to meet safety and reliability requirements
Regional New South Wales
Investment in water infrastructure by State Water in 2011-12 is estimated at $136 million. The investment is primarily for dam safety upgrades to handle extreme floods and earthquakes and for water saving projects funded by Water for Rivers.
 
 
3 - 30   Infrastructure Statement 2011-12

 


 

Major investments in 2011-12 include:
         
Major investments   2011-12 Allocation   Description
 
Water for Rivers Projects
  $33 million   Various projects such as metering, computer aided river management and other water saving projects to deliver world class river management in the Murrumbidgee Valley. These projects are funded by the NSW, Victorian and Australian Governments through the Water for Rivers program
 
       
Copeton Dam Upgrade
  $27 million   Upgrade of Copeton Dam to meet modern day dam safety standards for extreme events
 
       
Keepit Dam Upgrade
  $10 million   Upgrade of Keepit Dam to meet modern day dam safety standards for extreme events
Major projects completed in 2010-11 (with total estimated cost) include:
  upgrade of Blowering Dam ($44 million).
3.9 Public Order and Safety
Infrastructure investment in the public order and safety policy area in 2011-12 is estimated at $440 million which is $46 million below or 9.5 per cent below the 2010-11 Budget. Funding in 2011-12 is largely for police, court and juvenile justice facilities. The public order and safety policy area represents 2.9 per cent of the total state investment in infrastructure.
This policy area covers capital investments for agencies in the justice system, including the NSW Police Force, the Department of Attorney General and Justice and emergency services agencies such as the Fire and Rescue NSW and the Department of Rural Fire Service.
Infrastructure investment in this policy area contributes to the achievement of the NSW 2021 Plan goals.
  Prevent and reduce the level of crime.
 
  Prevent and reduce the level of re-offending.
 
  Improve community confidence in the justice system.
 
  Ensure NSW is ready to deal with major emergencies or natural disasters.
Capital building investment in the areas of policing, courts and fire services is aimed at providing secure, functional and cost effective accommodation to meet service demands in both urban and rural areas throughout the State. The availability of policing and fire fighting equipment is essential to enable officers to perform their roles effectively and safely.
 
Infrastructure Statement 2011-12   3 - 31

 


 

Demand for correctional accommodation is largely driven by inmate numbers in both adult and juvenile facilities. Appropriate accommodation is also required to deliver assessment, monitoring, intervention and rehabilitation programs for offenders in the community.
Ongoing investments in information and communication technologies across the sector will continue to improve operational efficiency and effectiveness.
The services provided by justice agencies are often interdependent. The key results and infrastructure needs of one agency can be influenced by the performance of other agencies as a person moves through the justice system.
Policing Services
Investment in policing infrastructure by the NSW Police Force is estimated at $155 million in 2011-12 and includes:
             
Major investments     2011-12 Allocation   Description
 
New Police Station Upgrades and Construction
  $4 million   An additional $69 million will be provided to the Police Force over the next four years to improve safety and responses by upgrading, replacing and building police stations.
 
           
100 Mobile Automatic Number Plate Recognition Units
  $4 million   $7 million over two years to purchase additional units to help improve road safety by better targeting vehicles infringing the law
 
           
Ballistic Protection Vests
  $3 million   $4 million over two years to improve officer safety by replacing vests that have reached the end of their economic life with new and improved ones
 
           
21st Century
Neighbourhood Watch
  $ 350,000   $500,000 over two years to promote enhanced community policing
 
           
Radio Communications and Network Upgrade
  $10 million   To maintain officer and community safety through maintenance and upgrading equipment and coverage
 
           
Continuing Planning and Construction of Police Stations
  $50 million   Improving security and functionality at Bowral, Burwood, Coffs Harbour, Deniliquin, Glendale, Leichhardt, Liverpool, Manly, Moree, Parkes, Parramatta, Raymond Terrace, Riverstone, Tenterfield, Tweed Heads, Walgett and Wyong
 
3 - 32   Infrastructure Statement 2011-12


 

         
Major investments   2011-12 Allocation   Description
 
Continuing Technology
Upgrades
  $33 million   Improving information processing and operational capacity through the ongoing upgrade of Police’s Core Operational Policing System, Stage 2 of the information technology upgrade, the establishment of a Closed Circuit TV Database, the creation of an interface with the Department of Attorney General and Justice’s JusticeLink online judicial network, and the rollout of an upgraded forensic exhibit information management system
 
       
Continuing Plant and Equipment and Fleet Upgrades
  $52 million   A range of other works improving officer safety including prisoner transport vehicles, the upgrade of prisoner handling facilities at 14 locations throughout the State and the fit-out of police vehicles
Major projects completed in 2010-11 (with estimated total cost) include:
  new police stations at Kempsey and Granville ($24 million)
 
  a new police helicopter ($8.4 million).
Custodial Services
Investment in custodial infrastructure by both the Corrective Services and Juvenile Justice Divisions of the Department of Attorney General and Justice is estimated to be $112 million in 2011-12 and includes:
         
Major investments   2011-12 Allocation   Description
 
Reducing Recidivism — Drug Rehabilitation Facility
  $5 million   Part of an overall program to reduce re-offending by providing appropriate rehabilitation services to drug addicts who are incarcerated.
 
       
Additional Adult Inmate
Capacity
  $15 million   Includes an expansion of capacity at the Cessnock and Nowra correctional facilities
 
Additional Capacity for
Juvenile Inmates
  $35 million   Includes an expansion of capacity at the Riverina and Cobham facilities
 
Infrastructure Statement 2011-12   3 - 33


 

         
Major investments   2011-12 Allocation   Description
 
Continuing Technology
Upgrades
  $17 million   Improve information processing by upgrading information management systems and technology
 
       
Building Maintenance and Fleet Upgrades
  $40 million   Includes a range of minor building and other works, the ongoing replacement of inmate transport vehicles and electronic security infrastructure
 
3 - 34   Infrastructure Statement 2011-12


 

Major projects completed in 2010-11 included the redevelopment of juvenile facilities at Emu Plains and Grafton and the refurbishment of Reiby Cottage at an estimated total cost of $12 million.
Court Services
Investment in court infrastructure by the Attorney General’s division of the Department of Attorney General and Justice is estimated at $68 million in 2011-12 and includes:
         
Major investments   2011-12 Allocation   Description
 
Newcastle Justice Precinct
  $9 million   $94 million for a justice precinct including additional courtrooms
 
       
Coffs Harbour Courthouse
  $1 million   $41 million for a new courthouse in Coffs Harbour as part of a new Government Services Precinct
 
       
Continuing Construction and Upgrades of Courts
  $29 million   Includes works at the John Maddison Tower/Downing Centre, Armidale and Taree courthouses, to improve access and security
 
       
Continuing Technology
Upgrades
  $12 million   For the ongoing development and implementation of the new Joined Up Justice, Legal eServices and the Lifelink system to improve the quality of information across justice sector agencies
 
       
Other Works
  $17 million   For a range of building works and other works across the State
Major projects completed in 2010-11 include the upgrade of remote witness facilities at an estimated total cost of $13 million.
Fire Services
Investment in fire services infrastructure by the Fire and Rescue NSW and the Department of Rural Fire Service is estimated at $65 million in 2011-12 and includes:
         
Major investments   2011-12 Allocation   Description
 
Replacement of Fire Engines
  $13 million   Part of Fire and Rescue NSW’s program of $67 million to replace fire engines
 
       
Replacement Motor Vehicle
Fleet
  $6 million   Part of the Rural Fire Service’s $78 million program to upgrade its fleet
Infrastructure Statement 2011-12   3 - 35

 


 

         
Major investments   2011-12 Allocation   Description
 
Continuing Fire Station Upgrades and Construction
  $17 million   For the ongoing program of construction and renovation of fire stations
 
       
Continuing Upgrades of Technology and Plant and Equipment
  $29 million   For improved network and information technology and other minor plant and equipment
Major projects completed in 2010-11 (with total estimated cost) include:
  the replacement of specialist fire engines and rescue vehicles ($9 million)
 
  upgraded fire stations at Silverwater, Greenacre and Raymond Terrace ($4 million).
3.10 Recreation and Culture
Infrastructure investment in the recreation and culture policy area in 2011-12 is estimated at $246 million, which is $15 million or 5.9 per cent less than the 2010-11 Budget.
The decrease is primarily due to the construction of the new Western Grandstand at Ausgrid Stadium and related works nearing completion and the timing of construction and restoration of exhibits at Taronga Zoo as part of the Zoological Parks Board’s Master Plan. The recreation and culture policy area represents 1.6 per cent of the total state investment in infrastructure.
Infrastructure investment in this policy area provides the community with the opportunity to participate and engage in community activities, across the areas of sport and recreation, arts and culture.
Infrastructure investment in this policy area contributes to the achievement of the NSW 2021 Plan goals: enhance cultural, creative, sporting and recreation opportunities.
Sport and Recreation
Major investments in 2011-12 include:
         
Major investments   2011-12 Allocation   Description
 
Western Grandstand, WIN
Stadium
  $16 million   The Illawarra Venues Authority is due to complete the construction of the new Western Grandstand and associated works to improve venue facilities for spectators and users in the staging of events at the Stadium.
 
       
Sydney Convention and Exhibition Centre Works
  $13 million   The Sydney Harbour Foreshore Authority will continue to improve venues facilities at the Centre including upgrading air conditioning, refurbishing facilities and other improvements.
3 - 36   Infrastructure Statement 2011-12


 

         
Major investments   2011-12 Allocation   Description
 
PlantBank — Research Education and Conservation Facility
  $12 million   The Royal Botanic Gardens and Domain Trust will continue the construction phase of PlantBank, a research, conservation and education facility at the Australian Botanic Garden, Mount Annan.
 
       
Master Plan Implementation — Taronga Zoo
  $9 million   The Zoological Parks Board will continue implementation of its Master Plan for Taronga Zoo, including the development of a Lemur Forest and the completion of visitor precinct improvements at the top entrance to Taronga Zoo.
 
       
Public Domain Upgrade
Program
  $5 million   The Sydney Harbour Foreshore Authority will continue public domain upgrade works across the Sydney City to improve public safety and enhance amenities.
 
       
Blaxland Riverside Park
Upgrade
  $5 million   The Sydney Olympic Park Authority is due to complete the upgrade of the Park which will provide a new playground, car parking and other related works to improve facilities for users of the Park.
 
       
Shooting Complex in the
Southern Highlands
  $3 million   The Department of Education and Communities is due to complete the expansion of the Complex.
 
       
Western Grandstand,
Ausgrid Stadium
  $3 million   The Hunter Region Sporting Venues Authority is due to complete the construction of the new Western Grandstand and associated works to improve venue facilities for spectators and users of the Stadium.
 
       
White Bay Power Station
Heritage Conservation
  $3 million   The Sydney Harbour Foreshore Authority is due to complete conservation works at the Power Station.
Major projects completed in 2010-11 (with estimated total cost) include the construction by the Royal Botanic Gardens and Domain Trust of a new entrance for the Australian Botanic Garden, Mount Annan ($4.3 million).
Infrastructure Statement 2011-12   3 - 37

 


 

Arts and Culture
Major investments in 2011-12 include:
         
Major investments   2011-12 Allocation   Description
 
Vehicle Access and Pedestrian Safety Project
  $47 million   The Sydney Opera House Trust will continue the construction of an underground road and loading dock, improvements to the forecourt roadway and lighting and other works to improve public safety, security and vehicle access, address occupational health and safety risks, and deliver operational and maintenance efficiencies.
 
       
Expanded Electronic
Catalogue
  $7 million   The State Library will continue to expand its electronic catalogue to improve community access to the Library’s collections.
 
       
Upgrading Education and Gallery Spaces
  $7 million   The Museum of Applied Arts and Sciences will continue the upgrade of education and gallery spaces to enable the Museum to present major exhibitions on a single floor, improve safety, increase capacity and improve the experience for school groups.
 
       
Refurbish Reading Rooms
  $5 million   The State Library will continue the refurbishment of the Library’s reading rooms to improve facilities for users.
 
       
Upgrade Stage Management
System
  $3 million   The Sydney Opera House will commence the upgrade of its stage management system which will improve operations management during theatre performances.
Major projects completed in 2010-11 (with estimated total cost) include:
  development by the Art Gallery of New South Wales of the John Kaldor Family Collection Space ($12 million)
 
  upgrade by the State Library of New South Wales of the air conditioning system and the treatment of concrete cancer ($5.1 million)
 
  replacement by the Australian Museum of the copper roof on a heritage building ($2.1 million).
3 - 38   Infrastructure Statement 2011-12

 


 

3.11 Other (including Social Security and Welfare)
Infrastructure investment for this policy area in 2011-12 is estimated at $928 million.
This represents 6.1 per cent of the total state investment in infrastructure. Investment in 2011-12 is $247 million or 36.3 per cent above the 2010-11 Budget, due principally to increased expenditure on information technology to improve the efficiency of service delivery and the undertaking of a feasibility study for the Cobbora coal mine.
Infrastructure investment in this policy area contributes to the achievement of the NSW 2021 Plan goal: increase opportunities for people with disabilities to gain access to support that meets their individual needs and realises their potential.
Social Security and Welfare
The Government provides support to those who are the most vulnerable within our community. This includes disability, housing, social and community services to support those who are most disadvantaged in our community or who need support during times of crisis.
Investment in infrastructure by the Department of Family and Community Services in 2011-12 is estimated at $121 million. This investment will assist in addressing the Government’s commitment to expand the range of accommodation and supports available to people with a disability, and to improve the delivery of child wellbeing and child protection services.
Major investments in 2011-12 include:
         
Major investments   2011-12 Allocation   Description
 
Additional Supported
Accommodation for People
with a Disability
  $41 million   A range of accommodation facilities developed by the Department to be constructed across the State
 
       
Supported Accommodation for Residents of Riverside Large Residential Centre
  $15 million   Village accommodation at Riverside (Orange) and accommodation in other Central West locations for people with a disability who currently live at the Riverside large residential centre
 
       
Aboriginal Children and Family Centres
  $14 million   Nine centres to be built under the National Partnership Agreement on Indigenous Early Childhood Development
 
       
Improve the Child
Protection Systems
  $13 million   Enhance the Assist information system to enable better tracking of services provided to strengthen families and support children
Infrastructure Statement 2011-12   3 - 39

 


 

         
Major investments   2011-12 Allocation   Description
 
Supported Accommodation for Residents of the Rydalmere and Westmead Large Residential Centres
  $4 million   Development of alternative accommodation for people with a disability who currently live in the Rydalmere and Westmead large residential centres. The accommodation will principally be in Western Sydney.
Major projects completed in 2010-11 (with total estimated cost) include:
  51 dwellings for support accommodation ($37 million)
 
  a supported accommodation cluster totalling 55 beds in Ryde ($20 million).
Other Purposes
The Other Purposes area covers investment in infrastructure such as the purchase of State fleet vehicles, investment in information systems by shared corporate service providers and the provision of office accommodation by certain agencies.
Major investments in 2011-12 include:
         
Major investments   2011-12 Allocation   Description
 
State Fleet vehicles
  $271million   The purchase of State Fleet motor vehicles for use by agencies including the Department of Health and NSW Police Force
 
       
Information Systems
  $90 million   To increase the capacity and improve the efficiency of Businesslink, the corporate and shared services provider for the Department of Family and Community Services
 
       
Cobbora Coal Mine
  $76 million   To undertake a feasibility study and development work for the Cobbora coal mine
 
       
Information Systems
  $43 million   To increase the capacity and improve the efficiency of Service First, the multi-tenanted shared services provider
 
       
Office Refurbishment
  $24 million   To undertake refurbishment work on State Property Authority-owned office buildings throughout New South Wales including in Grafton, Moree, Glenn Innes, Newcastle, Wollongong and Sydney
3 - 40   Infrastructure Statement 2011-12

 


 

         
Major investments   2011-12 Allocation   Description
 
Information Systems
  $12 million   To improve and upgrade various Information management systems across the Department of Finance and Services
 
       
Upgrade Office of State Revenue Tax Administration System
  $8 million   To upgrade the Office of State Revenue’s tax administration system for greater efficiency and to allow for greater online lodgment of data
Major projects completed in 2010-11 (with total estimated cost) include:
  the Rental Bond Board system upgrade ($8.5 million)
 
  the crown land conversion project ($5.8 million).
Infrastructure Statement 2011-12   3 - 41

 


 

Chapter 4: General Government Sector Projects
4.1 General Government Sector Projects
     
The Legislature
   
 
The Legislature
  4 - 3
 
   
Attorney General and Justice
   
 
Department of Attorney General and Justice
  4 - 4
Office of the Director of Public Prosecutions
  4 - 5
Fire and Rescue NSW
  4 - 6
Legal Aid Commission of New South Wales
  4 - 8
NSW Police Force
  4 - 8
NSW Trustee and Guardian
  4 - 11
Judicial Commission of New South Wales
  4 - 12
Department of Rural Fire Service
  4 - 12
Information and Privacy Commission
  4 - 12
Ministry for Police and Emergency Services
  4 - 12
New South Wales Crime Commission
  4 - 12
State Emergency Service
  4 - 12
 
   
Education and Communities
   
 
Department of Education and Communities
  4 - 13
Office of the Board of Studies
  4 - 20
Sydney Olympic Park Authority
  4 - 21
Community Relations Commission of New South Wales
  4 - 21
 
   
Family and Community Services
   
 
Department of Family and Community Services
  4 - 22
Aboriginal Housing Office
  4 - 24
NSW Businesslink Pty Limited
  4 - 25
Home Care Service of New South Wales
  4 - 26
 
   
Finance and Services
   
 
Department of Finance and Services
  4 - 27
Motor Accidents Authority
  4 - 29
State Property Authority
  4 - 29
State Records Authority
  4 - 30
WorkCover Authority
  4 - 30
Long Service Corporation
  4 - 31
Superannuation Administration Corporation
  4 - 31
Workers’ Compensation (Dust Diseases) Board
  4 - 31
 
   
Health
   
 
Department of Health
  4 - 32
Cancer Institute NSW
  4 - 39
Health Care Complaints Commission
  4 - 39
     
Infrastructure Statement 2011-12   4 - 1

 


 

     
Premier and Cabinet
   
 
   
Department of Premier and Cabinet
  4 - 40
Department of Planning and Infrastructure
  4 - 41
Independent Commission Against Corruption
  4 - 42
New South Wales Electoral Commission
  4 - 42
Public Service Commission
  4 - 43
Royal Botanic Gardens and Domain Trust
  4 - 44
Barangaroo Delivery Authority
  4 - 45
Centennial Park and Moore Park Trust
  4 - 45
Historic Houses Trust of New South Wales
  4 - 46
Minister Administering the Environmental Planning and Assessment Act
  4 - 47
Western Sydney Parklands Trust
  4 - 47
Independent Pricing and Regulatory Tribunal
  4 - 48
Ombudsman’s Office
  4 - 48
Police Integrity Commission
  4 - 48
Audit Office of New South Wales
  4 - 48
Redfern-Waterloo Authority
  4 - 48
 
   
Trade and Investment, Regional Infrastructure and Services
   
 
   
Department of Trade and Investment, Regional Infrastructure and Services
  4 - 49
Art Gallery of New South Wales
  4 - 50
Australian Museum
  4 - 51
Museum of Applied Arts and Sciences
  4 - 51
State Library of New South Wales
  4 - 52
Casino, Liquor and Gaming Control Authority
  4 - 53
New South Wales Rural Assistance Authority
  4 - 53
Catchment Management Authorities
  4 - 53
Destination NSW
  4 - 53
New South Wales Film and Television Office
  4 - 53
NSW Food Authority
  4 - 53
 
   
Transport
   
 
   
Department of Transport
  4 - 54
Roads and Traffic Authority of New South Wales
  4 - 55
Maritime Authority of NSW
  4 - 62
Independent Transport Safety Regulator
  4 - 62
Office of Transport Safety Investigations
  4 - 62
 
   
Treasury
   
 
   
The Treasury
  4 - 63
Crown Finance Entity
  4 - 63
NSW Self Insurance Corporation
  4 - 63
     
4 - 2   Infrastructure Statement 2011-12

 


 

The Legislature
The Legislature
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Major Works
                                               
New Works
                                               
Legislative Council Broadcast System
  Sydney     2011       2012       882               882  
Office Fit-out Parliament House
  Sydney     2011       2012       250               250  
 
Total new works
                                            1,132  
 
 
                                               
Work-In-Progress
                                               
 
                                               
Building Works at Parliament House
  Sydney     2007       2015       7,003       4,195       702  
 
                                               
Electoral Office Information and Communication Technology Upgrade
  Sydney     2010       2012       5,729       4,680       1,049  
Parliament House Security
  Sydney     2010       2012       4,085       1,085       3,000  
 
                                               
Upgrade to Parliament House Exit and Emergency Lighting
  Sydney     2010       2012       1,398       720       678  
 
Total work-in-progress
                                            5,429  
 
 
                                               
Total, Major Works
                                            6,561  
 
                                               
Minor Works
                                            2,075  
 
Total, The Legislature
                                            8,636  
 
     
Infrastructure Statement 2011-12   4 - 3

 


 

Attorney General and Justice
Department of Attorney General and Justice
                                                 
                            Estimated     Est. Expend     Allocation  
                            Total Cost     to 30-06-11     2011-12  
Project Description   Location     Start     Complete     $000     $000     $000  
 
Major Works
                                               
 
                                               
New Works
                                               
 
                                               
Coffs Harbour Courthouse
  Coffs Harbour     2011       2016       40,800               1,200  
 
                                               
Document Management System
  Various     2011       2012       2,675               2,675  
 
                                               
Reducing Recidivism - Support Systems
  Various     2011       2012       5,000               5,000  
 
Total new works
                                            8,875  
 
 
                                               
Work-In-Progress
                                               
 
                                               
1,000 Inmate Beds
  Various     2005       2014       296,355       236,396       15,275  
 
                                               
Client Information Management System Upgrade
  Haymarket     2010       2013       7,041       2,728       3,455  
 
                                               
Cobham Upgrade
  St Marys     2009       2013       40,255       7,024       19,904  
 
                                               
Court Upgrade Program (Including Justicelink Project)
  Various     2002       2015       213,289       115,645       10,347  
 
                                               
Forum Sentencing Facilities
  Various     2008       2013       1,070       150       257  
 
                                               
Front Line Offices - Refurbishment
  Various     2009       2013       7,240       5,241       980  
 
                                               
IT Infrastructure Strategic Plan - Corrective Services - Stage 1
  Various     2009       2013       47,567       27,492       10,400  
 
                                               
Inmate Escort Vehicles
  Silverwater     2005       2014       9,230       5,415       1,462  
 
                                               
John Maddison Tower / Downing Centre - Refurbishment
  Sydney     2010       2015       26,500       3,613       6,500  
 
                                               
Joined Up Justice
  Various     2009       2012       9,897       6,272       3,625  
 
                                               
Legal e-services
  Various     2009       2012       10,017       8,378       1,639  
 
                                               
New Armidale Courthouse
  Armidale     2010       2013       15,000       1,134       9,000  
 
                                               
Newcastle Justice Precinct
  Newcastle     2010       2015       94,130       3,639       9,710  
     
4 - 4   Infrastructure Statement 2011-12

 


 

Attorney General and Justice
Department of Attorney General and Justice (cont)
                                                 
                            Estimated     Est. Expend     Allocation  
                            Total Cost     to 30-06-11     2011-12  
Project Description   Location     Start     Complete     $000     $000     $000  
Redevelopment of Riverina Juvenile Justice Centre
  Wagga Wagga     2008       2013       29,388       8,067       15,391  
 
                                               
Registry of Births Deaths and Marriages - Lifelink Phase 2
  Various     2010       2012       11,400       4,780       6,620  
 
                                               
Taree Court Upgrade
  Taree     2010       2012       5,000       3,200       1,800  
 
                                               
 
Total work-in-progress
                                            116,365  
 
 
                                               
Total, Major Works
                                            125,240  
 
                                               
Minor Works
                                            55,042  
 
                                               
Total, Department of Attorney General and Justice
                                            180,282  
Office of the Director of Public Prosecutions
                                         
                        Estimated   Est. Expend   Allocation
                        Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Major Works
                                       
 
                                       
New Works
                                       
 
                                       
Integrated Performance
Management System
  Sydney     2011       2012       446           446  
 
Total new works
                                    446  
 
Total, Major Works
                                    446  
 
                                       
Minor Works
                                    1,368  
 
 
                                       
Total, Office of the Director of Public Prosecutions
                                    1,814  
 
     
Infrastructure Statement 2011-12   4 - 5

 


 

Attorney General and Justice
Fire and Rescue NSW
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Major Works
                                               
 
                                               
New Works
                                               
 
                                               
Bankstown Fire Station Renovation
  Bankstown     2011       2012       898               898  
 
                                               
Banora Point New Fire Station
  Banora Point     2011       2012       500               500  
 
                                               
Brewarrina New Fire Station
  Brewarrina     2011       2012       700               700  
 
                                               
Bundeena New Fire Station
  Bundeena     2011       2012       350               350  
 
                                               
Bush Fire Control Centres x 4
  Various     2011       2012       290               290  
 
                                               
Cardiff Fire Station Renovation
  Cardiff     2011       2012       887               887  
 
                                               
Chester Hill Fire Station Renovation
  Chester Hill     2011       2012       1,397               1,397  
 
Dubbo Regional West Area Office Renovation
  Dubbo     2011       2012       440               440  
 
ESCAD Newcastle - Major Renovation
  Newcastle     2011       2012       2,820               2,820  
 
Fairfield Fire Station Renovation
  Fairfield     2011       2012       946               946  
 
Grenfell Fire Station Major Renovation
  Grenfell     2011       2012       570               570  
 
Hornsby Fire Station Renovation
  Hornsby     2011       2012       899               899  
 
Huntingwood Fire Station Renovation
  Huntingwood     2011       2012       370               370  
 
Jerilderie Fire Station Renovation
  Jerilderie     2011       2012       788               788  
 
Lismore Regional North 2 Zone Office
  Lismore     2011       2012       295               295  
 
Parkes Fire Station Renovation
  Parkes     2011       2012       758               758  
 
Regional Training Centres
  Various     2011       2012       500               500  
 
Replacement of Fire Engines
  Various     2011       2015       35,913               7,161  
     
4 - 6   Infrastructure Statement 2011-12

 


 

Attorney General and Justice
Fire and Rescue NSW (cont)
                                                 
                            Estimated     Est. Expend     Allocation  
                            Total Cost     to 30-06-11     2011-12  
Project Description   Location     Start     Complete     $000     $000     $000  
 
Replacement of Specialist Fire Engines and Rescue Appliances
  Various     2011       2015       31,057               5,839  
 
                                               
Station Communication Equipment Replacement
  Various     2011       2015       15,181               4,558  
 
                                               
Tea Gardens Fire Station Renovation
  Tea Gardens     2011       2012       793               793  
 
                                               
Unanderra Fire Station Renovation
  Unanderra     2011       2012       505               505  
 
                                               
Wellington Training Centre Major Renovation
  Wellington     2011       2012       410               410  
 
 
                                               
Total new works
                                            32,674  
 
 
                                               
Work-In-Progress
                                               
 
                                               
Cabramatta Fire Station
  Cabramatta     2010       2012       2,770       515       2,255  
 
                                               
SAP HR Systems for Emergency Sector
  Sydney     2010       2012       7,433       2,973       4,460  
 
 
                                               
Total work-in-progress
                                            6,715  
 
 
                                               
Total, Major Works
                                            39,389  
 
Minor Works
                                            14,406  
 
Total, Fire and Rescue NSW
                                            53,795  
 
     
Infrastructure Statement 2011-12   4 - 7

 


 

Attorney General and Justice
Legal Aid Commission of New South Wales
                                                 
                            Estimated     Est. Expend     Allocation  
                            Total Cost     to 30-06-11     2011-12  
Project Description   Location     Start     Complete     $000     $000     $000  
 
Major Works
                                               
Work-In-Progress
                                               
Telephony Replacement
  Various     2011       2012       1,231       942       289  
Project
                                               
 
Total work-in-progress
                                            289  
 
Total, Major Works
                                            289  
Minor Works
                                            4,061  
 
Total, Legal Aid Commission of New South Wales
                                            4,350  
 
NSW Police Force
                                                 
                            Estimated     Est. Expend     Allocation  
                            Total Cost     to 30-06-11     2011-12  
Project Description   Location     Start     Complete     $000     $000     $000  
 
Major Works
                                               
 
                                               
New Works
                                               
 
                                               
21st Century
  Various     2011       2013       500               350  
Neighbourhood Watch
                                               
 
                                               
Ballistic Protective Vest
  Various     2011       2013       3,800               2,500  
 
                                               
Court Outcomes Enhancement Project to Automate Data Exchange
  Various     2011       2013       2,835               1,281  
 
                                               
Early Intervention System for Officer Welfare
  Various     2011       2014       7,018               2,312  
 
                                               
Fleet Management System
  Parramatta     2011       2012       638               638  
 
                                               
Government Licence System
  Parramatta     2011       2012       1,300               1,300  
 
                                               
Livescan Hardware Refurbishment
  Various     2011       2013       4,079               1,950  
 
                                               
Mobile Automatic Number Plate Recognition Equipment
  Various     2011       2013       7,200               3,600  
     
4 - 8   Infrastructure Statement 2011-12

 


 

Attorney General and Justice
NSW Police Force (cont)
                                                 
                            Estimated     Est. Expend     Allocation  
                            Total Cost     to 30-06-11     2011-12  
Project Description   Location     Start     Complete     $000     $000     $000  
 
Police Station Upgrade/Construction
  Various             2011       2015       69,000       4,000  
 
                                               
Prisoner Transport Vehicles
  Various             2011       2013       2,040       1,032  
 
                                               
Radio Communications Phase 4
  Various             2011       2012       9,894       9,894  
 
 
                                               
Total new works
                                            28,857  
 
 
                                               
Work-In-Progress
                                               
 
                                               
Bowral Police Station
  Bowral     2007       2015       12,676       226       700  
 
                                               
Burwood Police Station
  Burwood     2005       2012       17,489       15,624       1,865  
 
                                               
Coffs Harbour Police Station
  Coffs Harbour     2009       2015       18,938       251       1,000  
 
                                               
Deniliquin Police Station
  Deniliquin     2010       2014       11,088       133       2,305  
 
                                               
Glendale Police Station
  Glendale     2008       2014       17,343       816       3,822  
 
                                               
Gosford Police Station
  Gosford     2011       2012       10,250       6,000       4,250  
 
                                               
Lake Illawarra Police Station
  Oak Flats     2005       2012       18,811       18,016       795  
 
                                               
Leichhardt Police Station
  Leichhardt     2007       2014       20,448       2,414       2,054  
 
                                               
Liverpool Police Station
  Liverpool     2009       2014       18,000       5,721       3,052  
 
                                               
Manly Police Station
  Manly     2009       2014       14,784       3,594       2,000  
 
                                               
Moree Police Station
  Moree     2009       2013       17,789       2,761       6,225  
 
                                               
Parkes Police Station
  Parkes     2010       2013       12,802       978       6,784  
 
                                               
Parramatta Police Station
  Parramatta     2007       2015       23,555       1,539       716  
 
                                               
Raymond Terrace Police Station
  Raymond Terrace     2006       2012       12,581       11,990       591  
 
                                               
Riverstone Police Station
  Riverstone     2008       2014       17,280       1,125       5,090  
 
                                               
Tenterfield Police Station
  Tenterfield     2010       2012       526       130       396  
 
                                               
Tweed Heads Police Station
  Tweed Heads     2009       2014       15,099       848       4,000  
 
                                               
Walgett Police Station
  Walgett     2010       2013       9,358       559       5,641  
 
                                               
Wyong Police Station
  Wyong     2005       2012       14,637       12,024       2,613  
     
Infrastructure Statement 2011-12   4 - 9

 


 

Attorney General and Justice
NSW Police Force (cont)
                                                 
                            Estimated     Est. Expend     Allocation  
                            Total Cost     to 30-06-11     2011-12  
Project Description   Location     Start     Complete     $000     $000     $000  
 
Hurstville Joint Emergency Services Complex Air Conditioning Upgrade
  Hurstville     2011       2012       500       54       446  
 
                                               
Hurstville Joint Emergency Services Complex Lift Upgrade
  Hurstville     2011       2012       950       347       603  
 
                                               
Digital Closed Circuit TV in Police Station Charge Areas
  Various     2010       2015       20,849       3,491       2,626  
 
                                               
Fit-out of Vehicles for Additional Police Officers
  Various     2008       2013       5,223       2,858       1,183  
 
                                               
In Car Video Refresh
  Various     2011       2012       4,091       2,740       1,351  
 
                                               
Mobile Number Plate Recognition System Rollout
  Various     2009       2012       6,049       4,683       1,366  
 
                                               
Prisoner Handling Upgrades at 14 Locations
  Various     2009       2015       19,482       7,655       3,524  
 
                                               
Rollout of Tasers to First Response Police
  Various     2009       2013       6,503       5,401       551  
 
                                               
Sydney Police Centre Lift Upgrade
  Darlinghurst     2011       2012       600       201       399  
 
                                               
Zetland Relocation
  Potts Hill     2010       2012       5,551       5,216       335  
 
                                               
Computer Aided Dispatch Phase 2
  Parramatta     2010       2012       1,000       800       200  
 
                                               
Forensic and Exhibit Information Management System
  Parramatta     2009       2012       5,000       2,400       2,600  
 
                                               
Global Savings Project
  Various     2011       2012       2,000       724       1,276  
 
                                               
Interface with Justicelink Online Judicial System
  Parramatta     2006       2012       7,295       6,644       651  
 
                                               
Online Injury Management System
  Parramatta     2010       2012       1,000       321       679  
 
                                               
Police Education Centre
  Goulburn     2009       2012       1,650       643       1,007  
 
                                               
Police Rostering System Upgrade
  Parramatta     2010       2012       1,500       665       835  
 
                                               
SAP Consolidation Rationalisation, Upgrade Planning Study
  Parramatta     2010       2012       600       537       63  
     
4 - 10   Infrastructure Statement 2011-12

 


 

Attorney General and Justice
NSW Police Force (cont)
                                                 
                            Estimated     Est. Expend     Allocation  
                            Total Cost     to 30-06-11     2011-12  
Project Description   Location     Start     Complete     $000     $000     $000  
 
Upgrade of Core Operating Policing System
  Parramatta     2007       2012       45,902       33,617       12,285  
 
                                               
Upgrade of Information Technology Equipment Phase 2
  Various     2010       2014       43,000       12,828       9,242  
 
 
                                               
Total work-in-progress
                                            95,121  
 
 
                                               
Total, Major Works
                                            123,978  
 
                                               
Minor Works
                                            31,338  
 
                                               
 
Total, NSW Police Force
                                            155,316  
 
NSW Trustee and Guardian
                                                 
                            Estimated     Est. Expend     Allocation  
                            Total Cost     to 30-06-11     2011-12  
Project Description   Location     Start     Complete     $000     $000     $000  
 
Major Works
                                               
 
                                               
New Works
                                               
 
                                               
Fraud Control Software
  Parramatta     2011       2012       630               630  
O’Connell Street Office
                                               
Upgrade
  Sydney     2011       2015       3,005               1,670  
Office Fit-out
  Bankstown     2011       2012       350               350  
 
Total new works
                                            2,650  
 
Work-In-Progress
                                               
New Client Management System
  Sydney     2010       2016       7,400       5       2,000  
 
Total work-in-progress
                                            2,000  
 
Total, Major Works
                                            4,650  
Minor Works
                                            3,240  
 
Total, NSW Trustee and Guardian
                                            7,890  
 
     
Infrastructure Statement 2011-12   4 - 11

 


 

Attorney General and Justice
                                                 
                            Estimated     Est. Expend     Allocation  
                            Total Cost     to 30-06-11     2011-12  
Project Description   Location     Start     Complete     $000     $000     $000  
The following agencies have a Minor Works Program only.
                                               
 
                                               
Judicial Commission of New South Wales
                                            150  
Department of Rural Fire Service
                                            11,278  
Information and Privacy Commission
                                            366  
Ministry for Police and Emergency Services
                                            164  
New South Wales Crime Commission
                                            1,482  
State Emergency Service
                                            2,242  
     
4 - 12   Infrastructure Statement 2011-12

 


 

Education and Communities
Department of Education and Communities
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
School Education Services
                                               
Major Works
                                               
New Works*
                                               
Bass School for Special Purposes — New School
  Bass Hill     2011       2014                      
Cabramatta High School Upgrade — Stage 3
  Cabramatta     2011       2014                      
Gosford Public School — Relocation
  Gosford     2011       2014                      
Hurstville Public School Upgrade
  Hurstville     2011       2014                      
Nepean Creative and Performing Arts High School — New Performing Arts Facility
  Emu Plains     2011       2014                      
Oran Park Public School — New School
  Oran Park     2011       2014                      
State-wide Lighting Replacement Program 2011-12
  Various     2011       2013                      
 
Total new works
                            78,950               6,190  
 
Work-In-Progress*
                                               
Bega Public School - Consolidation
  Bega     2010       2012       3,195       289       2,906  
Bingara Gorge Public School — New School
  Wilton     2008       2012       8,066       7,755       311  
Bomaderry High School — New Gymnasium
  Bomaderry     2010       2012       3,035       2,785       250  
Building Better Schools — New High School Gymnasiums
  Various     2007       2012       30,800       30,215       585  
Building Better Schools — New Primary School Halls
  Various     2007       2012       41,471       40,738       733  
 
*   The estimated total cost and 2011-12 expenditure for new works and works in progress (which are yet to be tendered) have not been included due to their commercially sensitive nature.
     
Infrastructure Statement 2011-12   4 - 13

 


 

Education and Communities
Department of Education and Communities (cont)
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Cabramatta High School Upgrade — Stage 1
  Cabramatta     2009       2012       21,370       13,042       8,328  
Cabramatta High School Upgrade — Stage 2
  Cabramatta     2010       2013             358        
Cairnsfoot School — Relocation
  Arncliffe     2008       2014             613        
Callaghan College Wallsend Campus Upgrade
  Wallsend     2009       2012       7,760       3,411       4,349  
Casino Public School Upgrade
  Casino     2008       2012       9,363       5,681       3,682  
Central Coast Centre for Industry Training Excellence — Upgrades at Local High Schools
  Various     2010       2012       8,265       5,872       2,393  
Central West Trade College — Dubbo College Upgrade
  Dubbo     2009       2012       3,180       1,396       1,784  
Clarke Road School Upgrade
  Hornsby     2010       2013             1,027        
Connected Classrooms
  Various     2007       2012       110,351       97,351       13,000  
Coolamon Central School Upgrade
  Coolamon     2009       2012       6,928       6,532       396  
East Hills Boys High School Upgrade
  Panania     2008       2012       7,836       5,054       2,782  
East Hills Girls Technology High School Upgrade
  Panania     2008       2012       5,940       2,656       3,284  
Electronic Document and Record Management System
  Various     2009       2012       4,523       2,723       1,800  
Enterprise Information Management System
  Various     2010       2012       9,497       3,507       5,990  
Fort Street High School Upgrade **
  Petersham     2009       2012       14,503       5,913       8,590  
Gulgong High School Upgrade
  Gulgong     2009       2012       4,404       3,986       418  
Hilltop Road Public School — New Hall
  Merrylands     2009       2012       2,495       2,486       9  
 
**   Funded under a National Partnership Agreement.
     
4 - 14   Infrastructure Statement 2011-12

 


 

Education and Communities
Department of Education and Communities (cont)
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Homebush West Public School Upgrade
  Strathfield     2009       2012       6,463       905       5,558  
Georges River College Hurstville Boys Campus Upgrade
  Hurstville     2009       2012       14,661       6,902       7,759  
Illawarra Industry Training College — Port Kembla High School Upgrade
  Port Kembla     2010       2012       5,596       2,414       3,182  
Jerrabomberra Public School Upgrade
  Jerrabomberra     2009       2012       2,157       1,930       227  
Karonga School Upgrade
  Epping     2010       2012             3        
Kyogle High School Upgrade
  Kyogle     2010       2013             613        
Lachlan Macquarie College for Maths and Science Upgrade
  North Parramatta     2008       2012             33        
Learning Management and Business Reform Project — Human Resource and Payroll Systems
  Various     2010       2014             97        
Learning Management and Business Reform Project — Stage 1
  Various     2008       2012       203,280       165,327       37,953  
Learning Management and Business Reform Project — Student Administration and Learning Management System
  Various     2010       2014             809        
Neutral Bay Public School Upgrade
  Neutral Bay     2009       2012       5,921       5,894       27  
Newcastle Schools for Special Purposes - Consolidation
  Various     2009       2012       1,487       1,397       90  
Premier’s Sporting Challenge — Upgrade Sports High Schools
  Various     2009       2012       10,738       10,040       698  
Queanbeyan Industry Training College - Karabar High School Upgrade
  Karabar     2010       2012       1,852       1,484       368  
     
Infrastructure Statement 2011-12   4 - 15

 


 

Education and Communities
Department of Education and Communities (cont)
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Roseville Public School Upgrade
  Roseville     2009       2012       6,725       6,561       164  
State-wide Demountable Replacement Program 2009-10
  Various     2009       2012       10,463       9,284       1,179  
State-wide Gymnasiums and Halls Program 2008-09
  Various     2008       2012       14,020       12,519       1,501  
Ulladulla High School Upgrade — Stage 2
  Ulladulla     2008       2012       6,146       6,032       114  
Ulladulla High School Upgrade — Stage 3
  Ulladulla     2010       2013       11,989       686       5,059  
Wauchope High School Upgrade
  Wauchope     2009       2012       7,567       6,728       839  
 
Total work-in-progress
                                            183,509  
 
Total, Major Works
                                            189,699  
National Partnership Programs
                                               
Building the Education Revolution — Primary Schools for the 21st Century
                                            221,110  
National Solar Schools Program
                                            13,125  
Trade Training Centres
                                            48,985  
 
Total, National Partnership Programs
                                            283,220  
 
Minor Works
                                               
Technology for Learning
                                            35,300  
School Infrastructure Upgrades
                                            89,290  
Other Minor Works
                                            42,748  
Total, Minor Works
                                            167,338  
 
Total, School Education Services
                                            640,257  
 
     
4 - 16   Infrastructure Statement 2011-12

 


 

Education and Communities
Department of Education and Communities (cont)
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
TAFE Education Services
                                               
Major Works
                                               
New Works*
                                               
Albury TAFE - New Connected Learning Facilities
  Albury     2011       2014                      
Enmore TAFE - Design Centre Upgrade
  Enmore     2011       2014                      
Kingscliff TAFE - Campus Refurbishment
  Kingscliff     2011       2014                      
Lidcombe TAFE - Campus Upgrade
  Lidcombe     2011       2014                      
Maitland TAFE - Centre for Dry Wall Plastering and Associated Trades
  Maitland     2011       2014                      
Nirimba TAFE - Refurbishment
  Quakers Hill     2011       2014                      
North Sydney TAFE - Campus Redevelopment Stage 3
  St Leonards     2011       2014                      
Orange TAFE - New Aboriginal Training Centre
  Orange     2011       2014                      
TAFE e-Learning Systems - Stage 2
  Various     2011       2014                      
Tamworth TAFE - New Indigenous Learning Centre
  Tamworth     2011       2014                      
 
Total new works
                            65,100               6,510  
 
Work-In-Progress*
                                               
Armidale TAFE - Community Services Upgrade
  Armidale     2009       2012       8,006       5,309       2,697  
Campbelltown TAFE - Fire Hydrant Replacement
  Campbelltown     2009       2012       1,656       883       773  
 
*   The estimated total cost and 2011-12 expenditure for new works and works in progress (which are yet to be tendered) have not been included due to their commercially sensitive nature.
     
Infrastructure Statement 2011-12   4 - 17

 


 

Education and Communities
Department of Education and Communities (cont)
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Central Coast Centre for Industry Training Excellence - Gosford TAFE Upgrade
  Gosford     2009       2012       3,401       2,074       1,327  
Central West Trade College - Dubbo TAFE Upgrade
  Dubbo     2010       2012       4,142       3,293       849  
Dubbo TAFE - Heavy Vehicles Facility
  Dubbo     2009       2012       9,680       9,519       161  
Illawarra Industry Training College - Wollongong TAFE Upgrade
  Wollongong     2010       2012             2,153        
Learning Management and Business Reform Project - Student Administration and Learning Management System
  Various     2010       2014             923        
Murwillumbah TAFE - Refurbishment
  Murwillumbah     2010       2013       2,992       304       2,088  
Muswellbrook TAFE - Mining Industry Skill Centre Stage 2
  Muswellbrook     2010       2012       1,498       313       1,185  
North Sydney TAFE - Campus Redevelopment and Bradfield Relocation
  St Leonards     2010       2014             379        
North Sydney TAFE - Dunbar Building Refurbishment - Stage 1
  St Leonards     2009       2013             1,282        
Northern Beaches TAFE - Health and Fitness Access and Customer Services
  Brookvale     2008       2012       7,210       6,067       1,143  
Nowra TAFE - Facilities Upgrade
  North Nowra     2008       2012       4,747       4,705       42  
Queanbeyan Industry Training College - Queanbeyan TAFE Upgrade
  Queanbeyan     2010       2012       3,090       1,341       1,749  
TAFE e-learning Systems - Stage 1
  Various     2010       2012       2,626       2,283       343  
Ultimo TAFE - AutoCell Transport Technical Centre
  Ultimo     2010       2013             1,410        
     
4 - 18   Infrastructure Statement 2011-12

 


 

Education and Communities
Department of Education and Communities (cont)
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Ultimo TAFE - Infrastructure Sustainability Stage 2
  Ultimo     2009       2012       2,500       1,583       917  
Ultimo TAFE - Infrastructure Sustainability Stage 3
  Ultimo     2010       2013       9,200       1,172       3,212  
Wagga Wagga TAFE - Engineering and Digital Media Facilities
  Wagga Wagga     2009       2012       8,190       4,766       3,424  
Wollongbar TAFE - Plumbing and Infrastructure Upgrade
  Wollongbar     2009       2012       1,500       1,485       15  
Wollongong TAFE - Metal Fabrication Upgrade
  Wollongong     2009       2012       7,100       2,660       4,440  
 
Total work-in-progress
                                            61,925  
 
Total, Major Works
                                            68,435  
Minor Works
                                            29,714  
 
Total, TAFE Education Services
                                            98,149  
 
Office of Communities
                                               
Major Works
                                               
Work-In-Progress
                                               
Milson Island — Dining Hall
  Brooklyn     2008       2012       3,179       3,019       160  
Employment Screening
  Sydney     2009       2012       1,433       933       500  
System — Rebuild
                                               
Jindabyne Sports
  Jindabyne     2010       2012       590       327       263  
Centre Upgrade
                                               
Broken Bay - Recreational Hall
  Patonga     2009       2012       3,275       981       2,294  
     
Infrastructure Statement 2011-12   4 - 19

 


 

Education and Communities
Department of Education and Communities (cont)
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Shooting Complex in the Southern Highlands — Expansion
  Hill Top     2010       2012       6,663       3,307       3,356  
 
Total work-in-progress
                                            6,573  
 
Total, Major Works
                                            6,573  
Minor Works
                                            7,263  
 
Total, Office of Communities
                                            13,836  
 
Total, Department of Education and Communities
                                            752,242  
 
Office of the Board of Studies
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Major Works
                                               
Work-In-Progress
                                               
Examination System Applications Development
  Sydney     2009       2015       2,291       979       316  
IBM iSeries Server
  Sydney     2010       2014       5,036       2,310       1,099  
Information Communication Technology Replacement Program
  Sydney     2009       2015       3,810       916       53  
 
Total work-in-progress
                                            1,468  
 
Total, Major Works
                                            1,468  
 
Total, Office of the Board of Studies
                                            1,468  
 
     
4 - 20   Infrastructure Statement 2011-12

 


 

Education and Communities
Sydney Olympic Park Authority
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Major Works
                                               
Work-In-Progress
                                               
Blaxland Riverside Park Upgrade
  Homebush Bay     2010       2012       6,900       1,950       4,950  
Developer Funded Precinct Improvements
  Homebush Bay     2006       2014       19,625       10,409       5,216  
 
Total work-in-progress
                                            10,166  
 
Total, Major Works
                                            10,166  
Minor Works
                                            6,803  
 
Total, Sydney Olympic Park Authority
                                            16,969  
 
 
The following agency has a Minor Works Program only.
                                     
Community Relations Commission of New South Wales
                          100
     
Infrastructure Statement 2011-12   4 - 21

 


 

Family and Community Services
Department of Family and Community Services
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Major Works
                                               
New Works
                                               
Child Protection IT System Improvements — Caseworker Assist
                                               
Caseworker Workload Management
  Ashfield     2011       2013       1,161             645  
Out-of-Home Care Contracted Placements Management Scoping
  Ashfield     2011       2012       250             250  
Stronger Together 2 Accommodation for People with a Disability
                                               
Early Intervention and Prevention Assessment Centres
  Various     2011       2015       8,215             2,550  
Large Residential Centre Redevelopments - Non Government Organisation
  Various     2011       2016       70,800             2,847  
Large Residential Centre Redevelopments - Stockton
  Various     2011       2016       13,100             1,574  
 
Total new works
                                            7,866  
 
Work-In-Progress
                                               
Accommodation for People with a Disability
                                               
Accommodation Facilities for New Clients
  Various     2005       2012       123,580       118,156       5,424  
Disability Assistance Package
  Various     2009       2012       33,680       29,380       4,300  
Modification of Group Homes (Safety and Compliance)
  Various     2005       2012       23,195       19,895       3,300  
Redevelopment of Hamlyn Facility
  Hamlyn Terrace     2007       2012       41,623       40,890       733  
Riverside Centre Redevelopment
  Various     2010       2013       30,082       2,240       14,743  
     
4 - 22   Infrastructure Statement 2011-12

 


 

Family and Community Services
Department of Family and Community Services (cont)
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Child Protection IT System Improvements — Caseworker Assist
                                               
Key Information
  Ashfield     2010       2013       7,155       1,574       3,581  
Directory System - Structured Decision Making
                                               
Key Information
  Ashfield     2009       2013       17,206       6,927       6,623  
Directory System Core Redesign
                                               
Non Government Organisation Portal
  Ashfield     2010       2013       4,257       452       1,831  
Child Protection IT System Improvements — Keep Them Safe
                                               
Electronic Document and Records Management System
  Ashfield     2010       2013       4,000       5       2,400  
Indigenous Children and Family Centres
                                               
Indigenous Children and Family Centres
  Various     2010       2013       26,139       454       14,402  
Office Accommodation including for Caseworkers
                                               
Ongoing Caseworker Accommodation Upgrades
  Various     2010       2015       17,137       3,180       3,741  
Stronger Together 2 Accommodation for People with a Disability
                                               
Large Residential Centre Redevelopments - Metro
  Various     2010       2015       117,900       9,169       4,131  
Supported Accommodation
  Various     2010       2016       200,400       4,487       28,388  
 
Total work-in-progress
                                            93,597  
 
Total, Major Works
                                            101,463  
Minor Works
                                            19,456  
 
Total, Department of Family and Community Services
                                            120,919  
 
     
Infrastructure Statement 2011-12   4 - 23

 


 

Family and Community Services
Aboriginal Housing Office
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Major Works
                                               
New Works
                                               
Aboriginal Housing - New Supply
  Various     2011       2012       12,251               11,773  
National Partnership - Remote Indigenous Housing New Supply and Employment Related Accommodation
  Various     2011       2012       15,203               14,025  
 
Total new works
                                            25,798  
 
Work-In-Progress
                                               
Aboriginal Housing — New Supply
  Various     2009       2011       12,719       11,492       1,227  
National Partnership - Remote Indigenous Housing New Supply and Employment Related Accommodation
  Various     2009       2015       177,433       19,593       12,070  
 
Total work-in-progress
                                            13,297  
 
Total, Major Works
                                            39,095  
Minor Works
                                            500  
 
Total, Aboriginal Housing Office
                                            39,595  
 
     
4 – 24   Infrastructure Statement 2011-12

 


 

Family and Community Services
NSW Businesslink Pty Limited
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Major Works
                                               
New Works
                                               
Corporate and Shared Services Reforms
                                               
Call Centre Consolidation
  Liverpool     2011       2012       4,733               4,733  
Data Centre Consolidation
  Liverpool     2011       2013       6,000               2,500  
Email Consolidation
  Liverpool     2011       2012       1,794               1,794  
Family and Community Services Offices Consolidation and Co-location
  Liverpool     2011       2013       2,000               1,500  
Goods and Services Sourcing to Payment System
  Liverpool     2011       2013       11,070               6,941  
Information Management System and Architecture
  Liverpool     2011       2013       9,000               4,500  
Information Technology Infrastructure Consolidation
  Liverpool     2011       2012       7,342               7,342  
Invoice Management System Roll-out
  Liverpool     2011       2012       469               469  
Project Management System and Framework
  Liverpool     2011       2012       1,000               1,000  
Server Consolidation and Virtualisation
  Liverpool     2011       2013       2,537               2,027  
Single Enterprise Resource Planning System
  Liverpool     2011       2013       21,649               21,419  
Voice Over Internet Protocol
  Liverpool     2011       2013       5,600               2,800  
Wide Area Network Consolidation
  Liverpool     2011       2013       7,100               6,700  
     
Infrastructure Statement 2011-12   4 - 25

 


 

Family and Community Services
NSW Businesslink Pty Limited (cont)
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Improved Service Delivery to Family and Community Services Clients                        
 
                                               
Client Management System: People with a Disability
  Liverpool     2011       2012       5,600               5,600  
 
                                               
Human Services Information and Referral Tool
  Liverpool     2011       2012       3,119               3,119  
 
                                               
Service Management System Upgrade: Home Care Clients
  Liverpool     2011       2013       3,000               1,800  
 
Total new works
                                            74,244  
 
 
                                               
Work-In-Progress
                                               
 
                                               
Business as Usual — Information Technology                        
 
                                               
Computers and Printers Managed Service
  Liverpool     2010       2014       20,782       4,517       5,706  
 
                                               
Core Information Technology Infrastructure Upgrade
  Liverpool     2009       2012       14,105       11,705       2,400  
 
                                               
Enhanced Data Storage and Backup
  Liverpool     2009       2015       19,955       4,955       1,500  
 
                                               
Refresh and Growth in IT Services Infrastructure
  Liverpool     2009       2015       63,726       16,369       2,802  
 
                                               
Corporate and Shared Services Reforms                        
 
                                               
Agency Transition - SUN to SAP IT System
  Liverpool     2010       2012       4,674       3,924       750  
 
Total work-in-progress
                                            13,158  
 
Total, Major Works
                                            87,402  
Minor Works
                                            2,320  
 
Total, NSW Businesslink Pty Limited                     89,722  
 
The following agency has a Minor Works Program only                        
Home Care Service of New South Wales                             3,000  
4 - 26   Infrastructure Statement 2011-12

 


 

Finance and Services
Department of Finance and Services
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Major Works
                                               
New Works
                                               
Aerial Film Capture
  Bathurst     2011       2014       900               300  
Cadastral Records Viewer Upgrade
  Bathurst     2011       2013       1,444               1,100  
Comprehensive Property Addressing System
  Bathurst     2011       2015       9,480               2,000  
Conversion of Crown Land Western Division to Torrens Title
  Sydney     2011       2013       3,680               2,388  
Disaster Recovery and High Availability
  Sydney     2011       2013       4,378               3,000  
Elevation Surface Model Project
  Bathurst     2011       2014       2,708               1,000  
Old System (Title) Paper Records
  Bathurst     2011       2013       1,005               500  
Spatial Information Exchange Redevelopment
  Bathurst     2011       2012       1,000               1,000  
eTendering Dynamic Sourcing Project
  Sydney     2011       2012       660               660  
 
Total new works
                                            11,948  
 
Work-In-Progress
                                               
Automated Electronic Examination and Registration of Records
  Sydney     2010       2014       5,916       1,723       2,671  
Automation of Digital Plan Processing System
  Sydney     2010       2012       2,684       1,384       1,300  
Building Improvements
  Bathurst     2010       2012       2,226       1,226       1,000  
Corporate and Shared Services Reform Project
  Sydney     2010       2012       8,871       3,310       5,561  
Digitisation of 16mm Microfilm Records
  Sydney     2010       2014       1,168       268       300  
Digitisation of Old Survey Plans
  Sydney     2010       2013       1,404       404       491  
Electronic Data Processing Equipment
  Various     2009       2013       16,750       8,447       4,100  
Infrastructure Statement 2011-12   4 - 27

 


 

Finance and Services
Department of Finance and Services (cont)
                                               
                            Estimated   Est. Expend Allocation
                            Total Cost   to 30-06-11 2011-12
Project Description   Location   Start   Complete   $000   $000 $000
 
Electronic Product Information Catalogue
  Sydney     2010       2012       752       452     300  
Government Licensing System
  Sydney     2010       2014       4,751       1,253     1,296  
Government Radio Network Digital Upgrade
  Various     2008       2012       33,704       29,374     4,330  
Information System Enhancements
  Sydney     2001       2015       141,177       96,279     12,292  
Information and Communication Technology Projects
  Various     2004       2015       45,265       29,548     4,759  
Office Refurbishment and Rationalisation
  Various     2005       2015       79,972       39,867     8,865  
ServiceFirst Rebuild Project
  Sydney     2011       2012       44,400       1,000     43,400  
State Debt Recovery Office Road Safety Project
  Parramatta     2010       2012       2,893       1,793     1,100  
StateFleet Motor Vehicles
  Various     2007       2015       3,234,464       2,090,866     270,504  
Survey Infrastructure Project
  Bathurst     2007       2014       6,787       4,266     1,250  
Total Asset Upgrade Program
  Parramatta     2010       2015       7,846       1,942     1,987  
Upgrade of Tax Administration System
  Parramatta     2008       2014       26,407       10,689     8,250  
 
Total work-in-progress
                                          373,756  
 
Total, Major Works
                                          385,704  
Minor Works
                                          8,331  
 
Total, Department of Finance and Services                                   394,035  
 
4 - 28   Infrastructure Statement 2011-12

 


 

Finance and Services
Motor Accidents Authority
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Major Works
                                               
Work-In-Progress
                                               
Case Management System
  Sydney     2008       2017       4,000       895       1,000  
Personal Injury Register System
  Sydney     2009       2017       6,000       83       2,200  
 
Total work-in-progress
                                            3,200  
 
Total, Major Works
                                            3,200  
Minor Works
                                            2,485  
 
Total, Motor Accidents Authority                                     5,685  
 
State Property Authority
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Major Works
                                               
Work-In-Progress
                                               
Building Refurbishment Program
  Various     2001       2015       97,822       54,231       23,960  
Systems and Equipment Upgrades
  Sydney     2007       2015       4,885       3,445       360  
 
Total work-in-progress
                                            24,320  
 
Total, Major Works
                                            24,320  
 
Total, State Property Authority                                     24,320  
 
Infrastructure Statement 2011-12   4 - 29

 


 

Finance and Services
State Records Authority
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Major Works
                                               
New Works
                                               
Digital Archives
  Kingswood     2011       2013       1,225               854  
 
Total new works
                                            854  
 
Total, Major Works
                                            854  
Minor Works
                                            345  
 
Total, State Records Authority
                                            1,199  
 
WorkCover Authority
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Major Works
                                               
New Works
                                               
Regional and District Office Accommodation
  Various     2011       2012       1,350               1,350  
 
Total new works
                                            1,350  
 
Work-In-Progress
                                               
National Work Health and Safety IT Program
  Gosford     2010       2012       1,699       633       1,066  
 
Total work-in-progress
                                            1,066  
 
Total, Major Works
                                            2,416  
Minor Works
                                            3,584  
 
Total, WorkCover Authority
                                            6,000  
 
4 - 30   Infrastructure Statement 2011-12

 


 

Finance and Services
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
The following agencies have a Minor Works Program only.
                   
Long Service Corporation
                562  
Superannuation Administration Corporation
                2,737  
Workers’ Compensation (Dust Diseases) Board
                1,930  
Infrastructure Statement 2011-12   4 - 31

 


 

Health
Department of Health
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Major Works
                                               
New Works
                                               
Braidwood Multipurpose Service
  Braidwood     2011       2012       260               260  
Bundeena Ambulance Services
  Bundeena     2011       2013       1,500               300  
Campbelltown Hospital Redevelopment and Emergency Department
  Campbelltown     2011       2016       139,086       2,086       7,000  
Capital Grants 2011-12
                                               
Australian Advanced Treatment Centre - Randwick
  Randwick     2011       2012       10,000               10,000  
Children’s Medical Research Institute - Westmead
  Westmead     2011       2012       20,000               20,000  
Neuroscience Research Australia - Randwick
  Randwick     2011       2012       6,000               6,000  
Westmead Millennium Institute
  Westmead     2011       2013       50,000               25,000  
Cessnock and Kurri Kurri Hospitals — Electric Beds
  Cessnock     2011       2012       500               500  
Concord Hospital - Foreshore Walk
  Concord     2011       2012       500               500  
Cooma Hospital - Dialysis Unit
  Cooma     2011       2012       1,000               1,000  
Dubbo Blood Bank — Heat Sealer
  Dubbo     2011       2012       300               300  
Dubbo Hospital — Stages 1 and 2
  Dubbo     2011       2014       79,834       562       4,000  
Graythwaite Rehabilitation Centre
  Ryde     2011       2013       41,180       3,130       23,000  
Gulgong Multipurpose Service
  Gulgong     2011       2013       5,000               4,000  
Health Technology Program — New Works
  Various     2011       2012       7,500               7,500  
Illawarra Hospitals Upgrade (Shellharbour / Shoalhaven)
  Shellharbour     2011       2013       10,000               4,000  
4 - 32   Infrastructure Statement 2011-12

 


 

Health
Department of Health (cont)
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Information and Communication Technology                                        
Corporate Systems 2b
  Chatswood     2011       2014       48,700               2,900  
Critical ICT Infrastructure Upgrades
  Various     2011       2015       47,100               12,000  
Electronic Medical Record — Rollout to Clinical Specialties
  Various     2011       2018       85,400               5,000  
Electronic Medications Management System
  Various     2011       2020       170,300               11,037  
Intensive Care Unit Clinical Information System
  Various     2011       2014       43,130               6,327  
Land Acquisition Waratah - for Cancer Research Facility
  Waratah     2011       2013       8,000               1,000  
Local Initiatives 2011-12
  Various     2011       2012       88,500               88,500  
Maitland Mental Health - Carer’s Room
  Maitland     2011       2013       2,000               500  
Mona Vale Hospital - Maternity Refurbishment
  Mona Vale     2011       2012       1,700               1,700  
Northern NSW Planning - Lismore/Byron Bay
  Byron Bay     2011       2013       10,000               4,000  
Planning for Future New Health and Hospital Fund Projects at Bega and Tamworth
  Various     2011       2012       7,148       148       7,000  
Planning for Election Commitment Projects at Parkes and Forbes, Blacktown, Hornsby Ku-ring-gai and Hunter Valley hospitals, and Cessnock Hospital Emergency Department
  Various     2011       2012       11,500               11,500  
Port Macquarie Base Hospital Expansion
  Port Macquarie     2011       2015       110,000               16,000  
Prince of Wales Hospital Comprehensive Cancer and Blood Disorder Unit
  Randwick     2011       2015       47,212               2,000  
Royal North Shore Hospital Additional Inpatient Capacity and Co-location of Mental Health Services
  St Leonards     2011       2014       55,000               8,000  
Infrastructure Statement 2011-12   4 - 33

 


 

Health
Department of Health (cont)
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Ryde Hospital — Aged and Surgical Wards
  Ryde     2011       2013       5,000               500  
St George Hospital Emergency Department
  Kogarah     2011       2014       35,547       1,547       2,000  
Wagga Wagga Base Hospital Redevelopment
  Wagga Wagga     2011       2016       270,100       1,613       48,000  
Wansey Dialysis Centre - New Equipment
  Charlestown     2011       2012       500               500  
Woy Woy Hospital - Refurbishment to Re-open Rehabilitation Facility
  Woy Woy     2011       2013       5,000               500  
Wyong Hospital Upgrade Emergency Department
  Wyong     2011       2013       2,000               500  
 
Total new works
                                            342,824  
 
Work-In-Progress
                                               
Ambulance Service of NSW
                                               
Ambulance Electronic Health Record
  Rozelle     2008       2013       12,910       10,448       1,376  
Ambulance Fleet - Replacement Program
  Rozelle     2010       2015       41,925       5,543       8,790  
Ambulance Radio Network
  Rozelle     2008       2012       1,400       1,044       356  
Ambulance Rostering System
  Rozelle     2010       2012       2,000       734       1,266  
Ambulance Technology Infrastructure Upgrade
  Rozelle     2010       2015       7,188       242       1,646  
Auburn Ambulance Station Co-location
  Auburn     2010       2012       370       230       140  
Batemans Bay Ambulance Station
  Batemans Bay     2008       2012       2,240       1,924       316  
Byron Bay Ambulance Station
  Byron Bay     2008       2012       1,400       551       849  
Cessnock Ambulance Station
  Cessnock     2010       2012       1,697       1,192       505  
Coonamble Ambulance Station
  Coonamble     2010       2012       1,447       1,230       217  
4 - 34   Infrastructure Statement 2011-12

 


 

Health
Department of Health (cont)
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Medical Equipment Replacement Program
  Rozelle     2010       2015       17,778       1,269       3,809  
Murwillumbah Ambulance Station
  Murwillumbah     2010       2012       2,065       100       1,965  
Armidale Hospital Refurbishment
  Armidale     2010       2013       5,000       200       1,000  
Bathurst Hospital Ambulatory Care (Heritage Building)
  Bathurst     2009       2012       8,500       4,678       3,822  
Breast Cancer Screening
  Alexandria     2007       2013       36,942       21,786       7,094  
Council of Australian Governments (COAG) Capital Program                                
COAG Four Hour Access Target for Emergency Departments
  Various     2010       2014       72,531       11,211       28,700  
COAG Improving Access to Elective Surgery
  Various     2010       2014       40,300       20,963       16,206  
COAG Other Capital Initiatives
  Various     2010       2014       55,554       31,141       14,849  
COAG Sub-Acute Beds Program
  Various     2010       2014       191,600       7,800       94,300  
Digital Regions Initiatives
  Various     2010       2013       8,008       5,748       1,592  
Emergency Department Upgrades — Hughes Walters Recommendations
  Various     2010       2013       4,400       1,250       2,600  
Government Energy Efficiency Implementation Program                                
Nepean Blue Mountains LHD — Energy Performance Contract
  Katoomba     2010       2012       1,867       1,542       325  
Western Sydney LHD - Energy Efficiency Project
  Westmead     2010       2012       1,984       721       1,263  
Grafton Base Hospital Orthopaedic Ward and Imaging Expansion
  Grafton     2010       2012       10,000       1,000       9,000  
Hornsby Hospital Adult Acute Mental Health Unit and Child/Adolescent Mental Health Unit
  Hornsby     2010       2013       33,590       1,562       26,556  
Infrastructure Statement 2011-12   4 - 35

 


 

Health
Department of Health (cont)
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Information and Communication Technology                                        
Business Information Strategy
  Chatswood     2007       2012       35,948       34,448       1,500  
Community Health and Outpatients Information System
  Chatswood     2009       2016       95,994       10,318       20,276  
Corporate Systems Stage 2
  Chatswood     2009       2014       94,616       22,708       25,371  
Infrastructure Strategy Phase 1
  Chatswood     2009       2013       38,608       25,920       12,243  
Medical Imaging Information System
  Various     2007       2012       63,103       51,375       11,728  
Patient and Clinical Systems
  Chatswood     2003       2012       39,903       37,948       1,955  
Kogarah Early Childhood Centre
  Kogarah     2010       2012       200             200  
Liverpool Hospital Car Park
  Liverpool     2010       2013       24,634       3,403       19,750  
Liverpool Hospital Redevelopment Stage 2
  Liverpool     2006       2012       397,264       336,403       60,861  
Mona Vale Hospital Facade Rectification Works
  Mona Vale     2010       2012       704       104       600  
Multipurpose Services (MPS) and HealthOne NSW                                        
Gundagai Multipurpose Service
  Gundagai     2010       2012       13,202       1,760       11,442  
HealthOne Projects
  Various     2010       2013       4,000             500  
Lockhart Multipurpose Service
  Lockhart     2010       2013       10,030       200       8,246  
Manilla MPS / HealthOne
  Manilla     2009       2012       19,705       17,338       2,367  
Other MPS and HealthOne projects
  Various     2006       2014       29,633       8,248       10,497  
Werris Creek MPS / HealthOne
  Werris Creek     2010       2012       11,182       1,707       9,475  
Narrabri Hospital Redevelopment
  Narrabri     2009       2012       37,690       28,248       9,442  
4 - 36   Infrastructure Statement 2011-12

 


 

Health
Department of Health (cont)
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Nepean Hospital Redevelopment Stage 3
  Penrith     2009       2012       94,502       70,846       23,656  
Nepean Hospital Redevelopment Stage 3A
  Penrith     2010       2013       44,300       4,470       22,637  
Northern Beaches Hospital - Planning
  Frenchs Forest     2010       2014       29,000       1,859       5,000  
Prince of Wales Hospital Mental Health Intensive Care Unit
  Randwick     2010       2013       15,407       1,790       12,962  
Provision for Health Infrastructure Transition Costs
  North Sydney     2008       2013       33,651       25,024       7,500  
Public Private Partnerships (PPP) — Cyclical Maintenance                                        
Long Bay Forensic Hospital Cyclical Maintenance
  Malabar     2010       2018       12,718       27       28  
Newcastle Mater Hospital Cyclical Maintenance
  Newcastle     2008       2018       24,873       2,401       978  
Orange Base Hospital Cyclical Maintenance
  Orange     2008       2018       55,429       8,733       4,477  
Royal North Shore Hospital Cyclical Maintenance
  St Leonards     2008       2018       62,377       4,786       2,916  
Queanbeyan Hospital Renal Services
  Queanbeyan     2009       2012       1,620       1,212       408  
Regional Cancer Centres
                                               
Coffs Harbour Regional Cancer Centre
  Coffs Harbour     2010       2012       5,802       161       5,641  
Gosford Regional Cancer Centre
  Gosford     2010       2013       38,593       3,175       17,372  
Illawarra Regional Cancer Centre
  Wollongong     2010       2013       14,067       411       5,633  
Lismore Regional Cancer Centre
  Lismore     2010       2012       9,515       2,703       6,812  
Port Macquarie Regional Cancer Centre
  Port Macquarie     2010       2012       4,750       4,490       260  
Shoalhaven Regional Cancer Centre
  Nowra     2010       2014       34,801       1,998       9,893  
Tamworth Regional Cancer Centre
  Tamworth     2010       2014       41,691       2,656       15,827  
Infrastructure Statement 2011-12   4 - 37

 


 

Health
Department of Health (cont)
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Royal North Shore Hospital (RNSH) Redevelopment*                                        
Royal North Shore Hospital — Public Private Partnership
  St Leonards     2010       2016       721,672       49,564          
Royal North Shore Hospital Community Health Services (Retained costs)
  St Leonards     2002       2015       161,037       94,766       12,289  
Royal North Shore Hospital Research and Education Building
  St Leonards     2005       2012       100,179       96,684       3,495  
Royal North Shore Hospital Clinical Services Building
  St Leonards     2010       2014       91,800       3,616       6,134  
Royal Prince Alfred Hospital North West Precinct — Planning
  Camperdown     2010       2012       775       744       31  
State-wide Planning and Asset Maintenance
  North Sydney     1995       2016       53,832       49,061       1,000  
Strategic Health Facility Renewal/Upgrade Projects-Planning
  Various     2010       2012       7,480       3,963       3,517  
Sydney Children’s Hospital Child-Adolescent Mental Health Unit
  Randwick     2007       2013       27,727       3,117       21,019  
Wollongong Hospital Elective Surgery Unit
  Wollongong     2010       2015       86,149       644       1,000  
 
Total work-in-progress
                                            625,480  
 
Total, Major Works
                                            968,304  
Minor Works
                                            114,052  
Total, Department of Health
                                            1,082,356  
 
Less Capital Expensing/Capital Grants**                             161,362  
 
Total, Department of Health (Capital Expenditure)                             920,994  
 
 
*   Total Value of RNSH redevelopment is $983 million
 
**   Includes $61 million in capital grants to external health research facilities; and one-off project expenditure that is capital expensed i.e. subsequently treated as operating expenditure. It is shown separately to ensure valid comparison with prior years and to enable separate identification of capital expenditure.
4 - 38   Infrastructure Statement 2011-12

 


 

Health
Cancer Institute NSW
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Major Works
                                               
 
                                               
Work-In-Progress
                                               
 
                                               
Information Technology Enhancements for Cancer Programs
  Redfern     2007       2012       5,524       3,568       1,956  
 
Total work-in-progress
                                            1,956  
 
 
                                               
Total, Major Works
                                            1,956  
 
                                               
Minor Works
                                            900  
 
                                               
 
Total, Cancer Institute NSW
                                            2,856  
 
 
The following agency has a Minor Works Program only.
                             
Health Care Complaints Commission
                              25  
     
Infrastructure Statement 2011-12   4 - 39

 


 

Premier and Cabinet
Department of Premier and Cabinet
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Major Works
                                               
 
                                               
New Works
                                               
 
                                               
Air Quality Monitoring
  Appin     2011       2012       440               440  
 
                                               
Creating Dharawal National Park
  Various     2011       2015       686               107  
 
                                               
ICT Management Systems for Assets, Work, Inquiry and Reporting
  Various     2011       2014       2,486               1,136  
 
                                               
Improving Visitor Infrastructure in National Parks
  Various     2011       2015       6,000               1,000  
 
                                               
Licensing System Renewal
  Various     2011       2012       315               315  
 
                                               
Maintain Scientific Service Capacity
  Various     2011       2015       3,015               315  
 
                                               
Online Publication System
  Sydney     2011       2014       309               133  
 
                                               
Threatened Species System
  Various     2011       2015       800               150  
 
                                               
Upgrade of Park and Wildlife Website
  Various     2011       2014       2,278               1,219  
 
                                               
 
Total new works
                                            4,815  
 
 
                                               
Work-In-Progress
                                               
 
                                               
Acquisition of Satellite Imagery
  Various     2007       2012       13,596       11,896       1,700  
 
                                               
Brigalow/Nandewar Establishment
  Various     2005       2013       21,982       20,982       500  
 
                                               
Fire Management in National Parks
  Various     2008       2022       51,848       11,199       4,415  
 
                                               
Land Purchases
  Various     2002       2014       69,134       56,809       5,030  
 
                                               
Perisher Range
  Perisher                                        
Redevelopment
  Valley     2005       2026       41,177       23,838       3,439  
 
                                               
Radio Network Upgrade
  Various     2008       2012       15,281       13,281       2,000  
 
                                               
Riverbank
  Various     2006       2012       96,671       91,076       5,595  
 
                                               
Riverina Red Gum Park Management
  Various     2010       2013       11,867       2,337       4,330  
     
4 - 40   Infrastructure Statement 2011-12

 


 

Premier and Cabinet
Department of Premier and Cabinet (cont)
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Upgrade of Information Technology Infrastructure
  Sydney     2008       2012       8,062       7,462       600  
 
                                               
Upper Hunter Air Quality — Dust Monitoring Network
  Muswellbrook     2010       2012       1,817       917       900  
 
Total work-in-progress
                                            28,509  
 
 
                                               
Total, Major Works
                                            33,324  
 
                                               
Minor Works
                                            25,052  
 
                                               
 
Total, Department of Premier and Cabinet                     58,376  
 
Department of Planning and Infrastructure
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Major Works
                                               
 
                                               
New Works
                                               
 
                                               
Electronic Housing Code Enhancement
  Various     2011       2012       4,325               4,325  
 
Total new works
                                            4,325  
 
 
                                               
Work-In-Progress
                                               
 
                                               
Acquisition of Coastal Land
  Various     1998       2015       38,888       26,888       3,000  
 
Total work-in-progress
                                            3,000  
 
Total, Major Works
                                            7,325  
 
                                               
Minor Works
                                            844  
 
Total, Department of Planning and Infrastructure                     8,169  
 
     
Infrastructure Statement 2011-12   4 - 41

 


 

Premier and Cabinet
Independent Commission Against Corruption
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Major Works
                                               
 
                                               
New Works
                                               
 
                                               
Information and Communication Technology Upgrade
  Sydney     2011       2015       2,658               2,002  
 
                                               
Office Relocation
  Sydney     2011       2012       4,768               4,768  
 
Total new works
                                            6,770  
 
 
                                               
Total, Major Works
                                            6,770  
 
                                               
Minor Works
                                            300  
 
                                               
 
Total, Independent Commission Against Corruption                     7,070  
 
New South Wales Electoral Commission
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Major Works
                                               
 
                                               
New Works
                                               
 
                                               
Microsoft Software Upgrade
  Sydney     2011       2012       300               300  
 
Total new works
                                            300  
 
Work-In-Progress
                                               
 
                                               
Election Funding Authority — Election Funding System
  Sydney     2008       2012       3,565       3,430       135  
 
                                               
Election Funding Authority Fit-out
  Sydney     2011       2011       818       693       125  
 
                                               
Election Systems Upgrade
  Sydney     2009       2012       9,344       9,244       100  
     
4 - 42   Infrastructure Statement 2011-12

 


 

Premier and Cabinet
New South Wales Electoral Commission (cont)
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Reconfiguration of Election Management Application for the 2012 Local Government Election
  Sydney     2010       2012       2,191       691       1,000  
 
Total work-in-progress
                                            1,360  
 
Total, Major Works
                                            1,660  
 
                                               
Minor Works
                                            100  
 
                                               
 
Total, New South Wales Electoral Commission                             1,760  
 
Public Service Commission
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Major Works
                                               
 
                                               
New Works
                                               
 
                                               
Office Fit-out
  Sydney     2011       2012       500               500  
 
                                               
Workforce Profile Information System
  Sydney     2011       2012       2,706               2,706  
 
Total new works
                                            3,206  
 
Total, Major Works
                                            3,206  
 
                                               
Minor Works
                                            100  
 
                                               
 
Total, Public Service Commission
                                            3,306  
 
     
Infrastructure Statement 2011-12   4 - 43

 


 

Premier and Cabinet
Royal Botanic Gardens and Domain Trust
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Major Works
                                               
 
                                               
New Works
                                               
 
                                               
Public Amenities and Barbecues for Mount Annan
  Camden     2011       2015       1,250               500  
 
                                               
Sydney Children’s Garden
  Sydney     2011       2016       8,938               500  
 
                                               
Sydney Tropical Centre Refurbishment
  Sydney     2011       2015       19,743               735  
 
                                               
Yurong Precinct Public Amenities
  Sydney     2011       2013       686               134  
 
Total new works
                                            1,869  
 
 
                                               
Work-In-Progress
                                               
 
                                               
Domain Roads and Pathways Upgrade
  Sydney     2009       2012       4,298       2,842       1,456  
 
                                               
PlantBank — Research Education and Conservation Facility
  Camden     2010       2014       19,787       1,238       11,590  
 
Total work-in-progress
                                            13,046  
 
 
                                               
Total, Major Works
                                            14,915  
 
                                               
Minor Works
                                            1,727  
 
                                               
 
Total, Royal Botanic Gardens and Domain Trust                     16,642  
 
     
4 - 44   Infrastructure Statement 2011-12

 


 

Premier and Cabinet
Barangaroo Delivery Authority
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Major Works
                                               
 
                                               
Work-In-Progress
                                               
 
                                               
Headland Park and Northern Cove — Design and Construction*
  Millers Point     2009       2016               22,623       31,952  
 
Total work-in-progress
                                            31,952  
 
 
                                               
Total, Major Works
                                            31,952  
 
                                               
 
Total, Barangaroo Delivery Authority                     31,952  
 
Centennial Park and Moore Park Trust
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Major Works
                                               
 
                                               
New Works
                                               
 
                                               
Building Repairs
  Sydney     2012       2013       400               50  
 
                                               
Diana Statue Restoration
  Sydney     2011       2012       450               450  
 
                                               
Driver Avenue and Grand Drive Reseal
  Sydney     2011       2012       1,000               1,000  
 
                                               
ES Marks Track Replacement
  Sydney     2012       2013       1,000               20  
 
                                               
Strategic Asset Management Review
  Sydney     2011       2012       350               350  
 
                                               
 
Total new works
                                            1,870  
 
 
*   The Estimated Total Cost of the project is subject to a tendering process and has not been included due to its commercially sensitive nature.
     
Infrastructure Statement 2011-12   4 - 45

 


 

Premier and Cabinet
Centennial Park and Moore Park Trust (cont)
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Work-In-Progress
                                               
 
                                               
Kensington and Little Kensington Pond Restoration
  Sydney     2010       2012       1,792       304       1,488  
 
                                               
Model Yacht Pond — Gross Pollutant Trap and Access
  Sydney     2011       2012       625       431       194  
 
                                               
Moore Park Car Park Land Remediation
  Sydney     2010       2012       1,580       980       600  
 
                                               
 
Total work-in-progress
                                            2,282  
 
Total, Major Works
                                            4,152  
 
                                               
Minor Works
                                            2,920  
 
                                               
 
Total, Centennial Park and Moore Park Trust                     7,072  
 
Historic Houses Trust of New South Wales
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Major Works
                                               
 
                                               
Work-In-Progress
                                               
 
                                               
Historic Houses and Collections — Restoration and Maintenance
  Various     2010       2012       3,040       2,595       445  
 
                                               
 
Total work-in-progress
                                            445  
 
 
                                               
Total, Major Works
                                            445  
 
                                               
Minor Works
                                            562  
 
                                               
 
Total, Historic Houses Trust of New South Wales                     1,007  
 
     
4 - 46   Infrastructure Statement 2011-12

 


 

Premier and Cabinet
Minister Administering the Environmental Planning and Assessment Act
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Major Works
                                               
 
                                               
Work-In-Progress
                                               
 
                                               
Erskine Park Link Road
  Various     2010       2012       8,038       38       8,000  
 
                                               
General Land Acquisition (Five-year Rolling Program)
  Various     2007       2015       177,522       77,522       25,000  
 
                                               
Land Acquisition for North West Rail Corridor
  Various     2006       2015       257,626       147,626       50,000  
 
                                               
Land Acquisition for South West Rail Corridor
  Various     2005       2012       133,262       128,262       5,000  
 
                                               
 
Total work-in-progress
                                            88,000  
 
 
                                               
Total, Major Works
                                            88,000  
 
                                               
 
Total, Minister Administering the Environmental Planning and Assessment Act                 88,000  
 
Western Sydney Parklands Trust
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Major Works
                                               
 
                                               
Work-In-Progress
                                               
 
                                               
Conservation Works
  Horsley Park     2008       2015       4,818       2,032       700  
 
                                               
Development of Bungarribee Park
  Blacktown     2008       2015       8,006       1,661       345  
 
                                               
Multipurpose Pathway
  Various     2009       2015       6,359       2,659       900  
 
                                               
Signage and Track Improvements
  Various     2009       2016       3,400       861       438  
 
                                               
Upgrade Nurragingy Reserve and Nearby Fields
  Doonside     2011       2012       2,000       40       1,960  
     
Infrastructure Statement 2011-12   4 - 47

 


 

Premier and Cabinet
Western Sydney Parklands Trust (cont)
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Upgrade and Improve Park Facilities
  Various     2010       2015       7,785       400       50  
 
                                               
Upgrade of Dairy Picnic Ground
  Horsley Park     2010       2014       2,210       10       1,000  
 
                                               
Upgrade of Pimelea Picnic Ground
  Horsley Park     2009       2015       13,500       6,880       1,800  
 
                                               
 
Total work-in-progress
                                            7,193  
 
 
                                               
Total, Major Works
                                            7,193  
 
                                               
Minor Works
                                            4,253  
 
Total, Western Sydney Parklands Trust                     11,446  
 
 
The following agencies have a Minor Works Program only.                        
 
                                               
Independent Pricing and Regulatory Tribunal                     180  
Ombudsman’s Office                     219  
Police Integrity Commission                     1,790  
Audit Office of New South Wales                     5,115  
Redfern-Waterloo Authority                     3,570  
     
4 - 48   Infrastructure Statement 2011-12

 


 

Trade and Investment, Regional Infrastructure and Services
Department of Trade and Investment, Regional Infrastructure and Services
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Major Works
                                               
New Works
                                               
Acquisition of Pier 2/3 Lease
  Sydney     2011       2015       4,500               1,250  
Arts Exchange — Maintenance and Compliance Work
  Sydney     2011       2015       4,000               1,000  
Coastal Infrastructure Repairs to Maritime Assets on Crown Land
  Various     2011       2015       51,076               12,300  
Energy Accounts Payment Assistance Scheme Database
  Sydney     2011       2012       500               500  
Maintenance Backlog — Arts-related Properties
  Sydney     2011       2015       4,000               1,000  
Pier 2/3 Compliance Work
  Sydney     2011       2015       2,780               740  
 
Total new works
                                            16,790  
 
Work-In-Progress
                                               
Biosecurity Information Management System
  Orange     2009       2014       9,570       3,699       1,715  
Biosecurity Upgrade of Elizabeth Macarthur Agricultural Institute
  Menangle     2008       2012       56,678       44,168       12,510  
Client Oriented Regulatory Information
  Sydney     2002       2012       11,596       10,009       1,587  
System
                                               
Commercial Fisheries Management System
  Cronulla     2009       2013       4,804       2,429       1,875  
Earthmoving Equipment Replacement Program
  Various     2010       2015       7,538       169       1,704  
Offshore Artificial Reef for Recreational Fishing
  Waverley     2009       2012       941       160       781  
Relocation of Gosford Horticulture Institute
  Ourimbah     2009       2012       8,077       5,577       2,500  
Scientific Research Project and Portfolio Management System
  Orange     2009       2012       1,042       942       100  
     
Infrastructure Statement 2011-12
  4 - 49

 


 

Trade and Investment, Regional Infrastructure and Services
Department of Trade and Investment, Regional Infrastructure and Services (cont)
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Wharf 4/5 — Substructure and Other Works
  Dawes Point     2007       2014       7,923       5,869       665  
 
Total work-in-progress
                                            23,437  
 
Total, Major Works
                                            40,227  
Minor Works
                                            15,022  
 
Total, Department of Trade and Investment, Regional Infrastructure and Services                     55,249  
 
Art Gallery of New South Wales
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Major Works
                                               
Work-In-Progress
                                               
Accessible Entrance
  Sydney     2010       2011       1,170       91       1,079  
Acquisition of Works of Art — Five-Year Program
  Sydney     2010       2015       12,619       4,619       2,000  
Building Maintenance Five-Year Program
  Sydney     2010       2015       12,551       2,111       2,610  
 
Total work-in-progress
                                            5,689  
 
Total, Major Works
                                            5,689  
Minor Works
                                            1,116  
 
Total, Art Gallery of New South Wales                     6,805  
 
     
4 - 50
  Infrastructure Statement 2011-12

 


 

Trade and Investment, Regional Infrastructure and Services
Australian Museum
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Major Works
                                               
Work-In-Progress
                                               
Temporary Exhibition Spaces
  Darlinghurst     2010       2012       2,650       677       1,973  
 
Total work-in-progress
                                            1,973  
 
Total, Major Works
                                            1,973  
Minor Works
                                            3,327  
 
Total, Australian Museum
                                            5,300  
 
Museum of Applied Arts and Sciences
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Major Works
                                               
New Works
                                               
Accessibility to Powerhouse Discovery Centre
  Castle Hill     2011       2012       683               683  
Roof Replacement of the Harwood Building at Ultimo
  Ultimo     2011       2012       905               905  
Upgrade of Lifts Toilets and Ramps at the Powerhouse Museum
  Ultimo     2011       2013       1,175               500  
 
Total new works
                                            2,088  
 
     
Infrastructure Statement 2011-12
  4 - 51

 


 

Trade and Investment, Regional Infrastructure and Services
Museum of Applied Arts and Sciences (cont)
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Work-In-Progress
                                               
Escalators Replacement
  Ultimo     2010       2012       812       10       802  
Historic Building Repairs
  Ultimo     2010       2013       964       75       819  
Major Building Repairs — Stonework
  Ultimo     2010       2012       3,965       2,626       1,339  
Replacing Fire Safety Doors
  Ultimo     2010       2012       507       10       497  
Upgrading Education and Gallery Spaces
  Ultimo     2010       2012       7,257       669       6,588  
 
Total work-in-progress
                                            10,045  
 
Total, Major Works
                                            12,133  
Minor Works
                                            3,370  
 
Total, Museum of Applied Arts and Sciences                             15,503  
 
State Library of New South Wales
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Major Works
                                               
New Works
                                               
Collection Storage and Reconfiguration
  Sydney     2011       2012       884               884  
 
Total new works
                                            884  
 
     
4 - 52
  Infrastructure Statement 2011-12

 


 

Trade and Investment, Regional Infrastructure and Services
State Library of New South Wales (cont)
                                                 
                            Estimated     Est. Expend     Allocation  
                            Total Cost     to 30-06-11     2011-12  
Project Description   Location     Start     Complete     $000     $000     $000  
 
Work-In-Progress
                                               
Collection Acquisitions — Five Year Program
  Sydney     2010       2015       39,746       6,356       13,785  
Expanded Electronic Catalogue
  Sydney     2008       2013       23,289       9,608       7,481  
General Building Works
  Sydney     2006       2012       7,207       5,847       1,360  
Refurbish Reading Rooms
  Sydney     2010       2012       4,760       44       4,716  
 
Total work-in-progress
                                            27,342  
 
Total, Major Works
                                            28,226  
Minor Works
                                            823  
 
Total, State Library of New South Wales                     29,049  
 
The following agencies have a Minor Works Program only.
         
Casino, Liquor and Gaming Control Authority
    70  
New South Wales Rural Assistance Authority
    50  
Border Rivers-Gwydir Catchment Management Authority
    23  
Central West Catchment Management Authority
    23  
Hawkesbury-Nepean Catchment Management Authority
    23  
Hunter-Central Rivers Catchment Management Authority
    23  
Lachlan Catchment Management Authority
    23  
Lower Murray-Darling Catchment Management Authority
    23  
Murray Catchment Management Authority
    23  
Murrumbidgee Catchment Management Authority
    23  
Namoi Catchment Management Authority
    23  
Northern Rivers Catchment Management Authority
    23  
Southern Rivers Catchment Management Authority
    23  
Sydney Metropolitan Catchment Management Authority
    23  
Western Catchment Management Authority
    23  
Destination NSW
    160  
New South Wales Film and Television Office
    44  
NSW Food Authority
    1,000  
     
Infrastructure Statement 2011-12
  4 - 53

 


 

Transport
Department of Transport
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Major Works
                                               
New Works
                                               
104 Replacement Buses for Private Operators
  Various     2011       2012       46,259               46,259  
64 Growth Buses
  Various     2011       2012       28,563               28,563  
93 Replacement Buses for
  Various     2011       2012       43,989               43,989  
State Transit Authority
                                               
Bus Depots
  Various     2011       2012       45,000               45,000  
North West Rail Link —
  Various     2011       2012       172,000               172,000  
Land Acquisition
                                               
 
Total new works
                                            335,811  
 
Work-In-Progress
                                               
Finalisation of Payments for 41 Buses Delivered 2010-11
  Various     2011       2012       29,043               29,043  
 
Total work-in-progress
                                            29,043  
 
Total, Major Works
                                            364,854  
Minor Works
                                            1,595  
 
Total, Department of Transport
                                            366,449  
 
     
4 - 54
  Infrastructure Statement 2011-12

 


 

Transport
Roads and Traffic Authority of New South Wales
                                             
                        Estimated   Est. Expend   Allocation
                        Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Start dates are not shown since each project is an amalgamation of individual works. Estimated total cost and completion dates are not available (n.a.) at this stage for some projects as they are in the planning phase. Completion date refers to when open to traffic. Further works may be undertaken and costs incurred after the completion date.
 
Major Works
                                           
Sydney
                                           
Alfords Point Bridge Northern Approach, Widen to 4 Lanes
  Padstow Heights             2011       42,000       30,898       7,000  
Alfords Point Road, Brushwood Drive to Georges River (Planning)
  Alfords Point             n.a.       n.a.       251       750  
Anzac Bridge Structural Upgrades
  Pyrmont             2013       n.a.       8,025       25,000  
Bringelly Road, Camden Valley Way to The Northern Road (Planning)
  Bringelly             n.a.       n.a.       3,271       1,000  
Bus Priority on Strategic Corridors
  Various             2012       295,000       265,000       30,000  
Camden Valley Way, Bernera Road to Cowpasture Road, Widen to 4 Lanes
  Edmondson Park             2011       48,000       42,881       4,000  
Camden Valley Way, Cowpasture Road to Cobbitty Road, Widen to 4 Lanes (Planning and Preconstruction)
  Leppington — Harringon Park             n.a.       n.a.       22,561       10,000  
Camden Valley Way, Cobbitty Road to Narellan Road, Widen to 4 Lanes
  Harrington Park             2012       33,000       13,432       15,000  
Campbelltown Road, Camden Valley Way to Zouch Road, Ingleburn (Planning)
  Ingleburn             n.a.       n.a.       806       500  
Erskine Park Link Road, Old Wallgrove Road to Lenore Lane
  Eastern Creek             2013       55,000       6,893       16,000  
F5 Widening, Brooks Road to Narellan Road (State and Federal Funded)
  Ingleburn — Campbelltown             2011       116,000       85,825       25,000  
General Holmes Drive, Remove Rail Level Crossing (Planning, Federal Funded)
  Mascot             n.a.       n.a.       1,925       1,200  
     
Infrastructure Statement 2011-12
  4 - 55

 


 

Transport
Roads and Traffic Authority of New South Wales (cont)
                                             
                        Estimated   Est. Expend   Allocation
                        Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Heathcote Road, Deadman’s
  Sandy Point             2014       n.a.       0       500  
Creek Bridge Upgrade
                                           
Hoxton Park Road, Banks Road to Cowpasture Road, Widen to 4 Lanes
  Hoxton Park             2011       62,000       54,247       6,000  
M2 Enhancements, Windsor Road to Lane Cove Road (State and Private Sector Funded)*
  Baulkham Hills — Macquarie Park             2013       550,000       12,277       3,500  
M5 Widening, King Georges Road to Camden Valley Way (Planning and Preconstruction, State and Private Sector Funded)*
  Beverly Hills — Prestons             n.a.       n.a.       19,693       2,000  
Mona Vale Road, McCarrs Creek Road to Powder Works Road (Planning)
  Ingleside             n.a.       n.a.       836       500  
Narellan Road, Camden Valley Way to F5 Freeway (Planning)
  Narellan — Campbelltown             n.a.       n.a.       470       1,000  
Network Management (Pinch Point Strategy)
  Various             2012       100,000       70,800       29,200  
Old Wallgrove Road, M7 to Erskine Park Link Road (Planning)
  Eastern Creek             n.a.       n.a.       665       1,000  
Richmond Road, Bells Creek to Grange Avenue (Planning)
  Marsden Park             n.a.       n.a.       730       500  
Richmond Bridge Congestion Study (Planning, Federal Funded)
  Richmond             n.a.       n.a.       82       1,500  
Schofields Road, Windsor Road to Tallawong Road, Widen to 4 Lanes (Planning and Preconstruction)
  Rouse Hill             n.a.       n.a.       9,050       5,000  
Schofields Road, Tallawong Road to Richmond Road (Planning)
  Schofields             n.a.       n.a.       2,849       3,800  
Schofields Road, New Rail Bridge for Future Westerly Extension of Schofields Road
  Schofields             2011       13,000       2,169       10,300  
 
*   The expenditure to 30-6-2011 and 2011-12 Allocation do not include any private sector contributions.
     
4 - 56
  Infrastructure Statement 2011-12

 


 

Transport
Roads and Traffic Authority of New South Wales (cont)
                                             
                        Estimated   Est. Expend   Allocation
                        Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Showground Road, Old Northern Road to Carrington Road (Planning)
  Castle Hill             n.a.       n.a.       909       100  
The Northern Road,
  Oran Park             n.a.       n.a.       2,298       2,500  
Camden Valley Way to Bringelly Road (Planning)
                                           
Werrington Arterial Stage 1, M4 Motorway to Great Western Highway (Planning, State and Federal Funded)
  Claremont Meadows             n.a.       n.a.       54       1,500  
Windsor Bridge over Hawkesbury River Replacement
  Windsor             n.a.       n.a.       2,318       2,050  
Great Western Highway
                                           
Woodford to Hazelbrook, Station Street to Ferguson Avenue, Widen to 4 Lanes (State and Federal Funded)
  Woodford, Hazelbrook             2012       160,000       92,745       32,000  
Lawson, Ferguson Avenue to Ridge Street, Widen to 4 Lanes
  Lawson             2012       220,000       163,236       40,000  
Bullaburra, Ridge Street to Genevieve Road, Widen to 4 Lanes
  Bullaburra             2014       n.a. *     9,285       4,000  
Bullaburra to Wentworth Falls, Genevieve Road to Tableland Road, Widen to 4 Lanes
  Bullaburra, Wentworth Falls             2014       85,000       14,035       15,000  
Wentworth Falls East, Tableland Road to Station Street, Widen to 4 Lanes (State and Federal Funded)
  Wentworth Falls             2012       115,000       85,543       28,000  
Mount Victoria to Lithgow (State And Federal Funded)
  Mt Victoria, Hartley             n.a.       n.a.       18,748       22,000  
Kelso, Ashworth Drive to Stockland Drive, Widen to 4 Lanes (Planning)
  Kelso             n.a.       n.a.       1,906       1,000  
Hume Highway
                                           
Tarcutta Bypass, Dual Carriageways (Federal Funded)
  Tarcutta             2011       290,000       204,969       65,000  
Holbrook Bypass, Dual Carriageways (State and Federal Funded)
  Holbrook             2013       247,000       28,028       116,000  
Woomargama Bypass, Dual Carriageways (Federal Funded)
  Woomargama             2011       265,000       179,845       65,000  
 
*   Estimated cost will be confirmed following award of major contract.
     
Infrastructure Statement 2011-12
  4 - 57

 


 

Transport
Roads and Traffic Authority of New South Wales (cont)
                                             
                        Estimated   Est. Expend   Allocation
                        Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Pacific Highway
                                           
Bulahdelah Upgrade, Dual Carriageways (State and Federal Funded)
  Bulahdelah             2012       315,000       143,565       100,000  
Failford Road to Tritton Road (Planning)
  Failford             n.a.       n.a.       4,396       800  
Herons Creek to Stills Road (State and Federal Funded)
  Herons Creek             2012       60,000       12,404       28,000  
Oxley Highway to Kempsey (Planning and Preconstruction, State and Federal Funded)
  Port Macquarie — Kempsey             n.a.       n.a.       19,528       32,000  
Kempsey Bypass, Dual Carriageways (Federal Funded)
  Kempsey             2013       618,000       176,461       260,000  
Frederickton to Eungai (Planning and Preconstruction, State and Federal Funded)
  Clybucca             n.a.       n.a.       2,196       12,000  
Warrell Creek to Urunga (Planning and Preconstruction, State and Federal Funded)
  Nambucca Heads             n.a.       n.a.       42,943       50,000  
Coffs Harbour Bypass (Planning, State and Federal Funded)
  Coffs Harbour             n.a.       n.a.       40,132       3,000  
Coffs Harbour (Sapphire) to Woolgoolga, Dual Carriageways (State and Federal Funded)
  Woolgoolga             2014       705,000       259,861       190,000  
Woolgoolga to Ballina (Planning and Preconstruction, State and Federal Funded)
  Grafton, Maclean             n.a.       n.a.       72,719       40,000  
Glenugie Upgrade, Dual Carriageways (State and Federal Funded)
  Glenugie             2011       60,000       46,807       13,000  
Devils Pulpit Upgrade, Dual Carriageways (State and Federal Funded)
  Tabbimoble             2013       77,000       10,288       29,000  
Ballina Bypass, Dual Carriageways (State and Federal Funded)
  Ballina             2012       640,000       592,472       32,000  
     
4 - 58
  Infrastructure Statement 2011-12

 


 

Transport
Roads and Traffic Authority of New South Wales (cont)
                                             
                        Estimated   Est. Expend   Allocation
                        Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Tintenbar to Ewingsdale Dual Carriageways (State and Federal Funded)
  Bangalow             2014       n.a. *     115,880       90,000  
Banora Point Upgrade, Including Sexton Hill (State and Federal Funded)
  Banora Point             2012       359,000       195,784       135,000  
Princes Highway
                                           
Gerringong Upgrade, Mount Pleasant to Toolijooa Road
  Gerringong             2015       n.a. *     11,776       25,000  
Foxground and Berry
  Berry             n.a.       n.a.       27,276       9,500  
Bypasses (Planning and Preconstruction)
                                           
Berry to Bomaderry Upgrade (Planning)
  Berry, Bomaderry             n.a.       n.a.       1,099       1,000  
South Nowra Duplication, Kinghorne Street to Forest Road
  Nowra             2013       62,000       6,757       18,000  
Victoria Creek Realignment
  Central Tilba             2013       45,000       4,437       17,000  
Dignams Creek Realignment (Planning)
  Dignams Creek             n.a.       n.a.       3,156       1,000  
Bega Bypass (State and Federal Funded)
  Bega             2013       n.a. *     5,365       10,000  
Illawarra
                                           
Picton Road Road Safety Treatments
  Wilton — Mount Keira             2013       42,600       21,200       14,000  
Central Coast
                                           
Central Coast Highway, Brisbane Water Drive, Manns Road Intersection Upgrade (Planning and Preconstruction)
  West Gosford             n.a.       n.a.       43,197       9,000  
Central Coast Highway, Carlton Road to Matcham Road, Widen to 4 Lanes
  Erina Heights             2012       75,000       54,122       18,000  
Central Coast Highway, Matcham Road to Ocean View Drive, Widen to 4 Lanes
  Wamberal             2013       80,000       29,641       20,000  
Central Coast Highway, Wisemans Ferry Road Intersection Upgrade (Planning and Preconstruction)
  Kariong             n.a.       n.a.       614       1,000  
 
*   Estimated cost will be confirmed following award of major contract.
     
Infrastructure Statement 2011-12
  4 - 59

 


 

Transport
Roads and Traffic Authority of New South Wales (cont)
                                             
                        Estimated   Est. Expend   Allocation
                        Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
F3 Freeway, Wyong Road Interchange Upgrade
  Tuggerah             2013       n.a. *     1,292       4,600  
Pacific Highway, Wyong Town Centre Upgrade (Planning)
  Wyong             n.a.       n.a.       2,138       500  
Pacific Highway, Wyong Road Intersection Upgrade (Planning)
  Tuggerah             n.a.       n.a.       357       1,000  
Pacific Highway, Lisarow to Ourimbah, Railway Crescent to Glen Road, Widen to 4 Lanes (Planning)
  Lisarow             n.a.       n.a.       7,924       3,250  
Pacific Highway, Narara to Lisarow Upgrade, Manns Road to Railway Crescent (Planning)
  Narara — Lisarow             n.a.       n.a.       6,505       1,000  
Terrigal Drive Improvements
  Erina — Terrigal             n.a.       n.a.       5,720       2,500  
Hunter
                                           
Hunter Expressway (F3 to Branxton) (State and Federal Funded)
  Seahampton — Branxton             2013       1,700,000       388,107       570,000  
Hunter Expressway Ancillary Works, F3 to Broadmeadow (Planning and Preconstruction)
  Wallsend — Broadmeadow             2014       n.a. *     2,632       10,000  
Limeburners Creek Road, Upgrade of Williams River Bridge
  Clarence Town             2014       n.a.       2,100       1,000  
Newcastle Inner Bypass, Shortland to Sandgate
  Sandgate             2013       133,000       36,936       32,000  
New England Highway, Scone Level Crossing Study (Planning, Federal Funded)
  Scone             n.a.       n.a.       66       1,000  
Paterson Road, Upgrade of Dunmore Bridge
  Woodville             2013       n.a.       3,634       6,100  
Thornton Railway Bridge
  Thornton             2012       16,000       2,686       7,000  
North Coast
                                           
Oxley Highway, Upgrade from Wrights Road to the Pacific Highway
  Port Macquarie             2011       115,000       76,969       23,000  
 
*   Estimated cost will be confirmed following award of major contract.
     
4 - 60
  Infrastructure Statement 2011-12

 


 

Transport
Roads and Traffic Authority of New South Wales (cont)
                                             
                        Estimated   Est. Expend   Allocation
                        Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Summerland Way, Additional Crossing of the Clarence River at Grafton (Planning)
  Grafton             n.a.       n.a.       5,834       4,000  
Waterfall Way, Replacement of Burdett Park Creek Culvert
  Fernmount             2012       n.a.       400       2,400  
South Western NSW
                                           
Barton Highway Safety Improvements, Gounyan Curve Realignment (Federal Funded)
  Murrumbateman             2012       22,000       12,669       7,000  
Olympic Highway, Kapooka Bridge and Approaches (Planning)
  Kapooka             n.a.       n.a.       471       750  
Western NSW
                                           
Kamilaroi Highway, Replacement of Bridge over Bogan River
  Beemery             2013       7,300       2,000       3,200  
Newell Highway Overtaking Lanes
  Various             n.a.       n.a.             5,000  
Orange — Parkes Road, Replacement of Boree Creek Bridge
  Boree             2012       7,100       3,200       2,800  
 
Total, Major Works
                                        2,440,800  
 
Minor Works
                                           
Road Network Sustainability
                                        353,144  
Other Minor Works
                                        361,009  
 
Total, Minor Works
                                        714,153  
 
Total, Roads and Traffic Authority of New South Wales                     3,154,953  
 
     
Infrastructure Statement 2011-12
  4 - 61

 


 

Transport
Maritime Authority of NSW
                                             
                        Estimated   Est. Expend   Allocation
                        Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Major Works
                                           
New Works
                                           
Rozelle Bay Precinct Refurbishment
  Rozelle     2011       2015       2,140               1,690  
Wharf Upgrades — New Commitment
  Various     2011       2015       7,500               2,000  
 
Total new works
                                        3,690  
 
Work-In-Progress
                                           
Blackwattle Bay
  Glebe     2010       2012       550       460       90  
Foreshore Development
                                           
Charter Vessel Wharves —
  Various     2008       2015       6,425       2,575       1,850  
Upgrade Program
                                           
Circular Quay Southern
  Sydney     2010       2015       4,645       580       65  
Promenade
                                           
Commuter Wharves — Upgrade Program
  Various     2006       2016       89,655       36,234       11,408  
 
Total work-in-progress
                                        13,413  
 
Total, Major Works
                                        17,103  
Minor Works
                                        7,000  
 
Total, Maritime Authority of NSW
                                        24,103  
 
 
                                           
The following agencies have a Minor Works Program only.                        
Independent Transport Safety Regulator                     50  
Office of Transport Safety Investigations                     20  
     
4 - 62
  Infrastructure Statement 2011-12

 


 

Treasury
The Treasury
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
The following agencies have a Minor Works Program only.
                                               
The Treasury
                                            385  
Crown Finance Entity
                                            500  
NSW Self Insurance Corporation
                                            449  
     
Infrastructure Statement 2011-12
  4 - 63

 


 

Chapter 5: Public Trading Enterprise Sector Projects
5.1 Public Trading Enterprise Sector Projects
     
Transport
   
 
   
Country Rail Infrastructure Authority
  5 - 2
Public Transport Ticketing Corporation
  5 - 3
Rail Corporation New South Wales
  5 - 3
State Transit Authority
  5 - 6
Sydney Ferries
  5 - 7
Transport Construction Authority
  5 - 8
 
   
Water
   
 
   
Hunter Water Corporation
  5 - 9
State Water Corporation
  5 - 11
Sydney Catchment Authority
  5 - 13
Sydney Water Corporation
  5 - 14
 
   
Ports
   
 
   
Newcastle Port Corporation
  5 - 16
Port Kembla Port Corporation
  5 - 17
Sydney Ports Corporation
  5 - 18
 
   
Housing
   
 
   
City West Housing Pty Limited
  5 - 19
New South Wales Land and Housing Corporation
  5 - 19
Teacher Housing Authority
  5 - 20
 
   
Property
   
 
   
Forests NSW
  5 - 22
Hunter Region Sporting Venues Authority
  5 - 23
Illawarra Venues Authority
  5 - 23
Landcom
  5 - 23
Parramatta Stadium Trust
  5 - 24
Sydney Cricket and Sports Ground Trust
  5 - 24
Sydney Harbour Foreshore Authority
  5 - 25
Sydney Opera House
  5 - 27
 
   
Other
   
 
   
Waste Asset Management Corporation
  5 - 28
Zoological Parks Board
  5 - 29
 
   
Competitive Government Sector
  5 - 30
     
Infrastructure Statement 2011-12   5 - 1

 


 

Transport
Country Rail Infrastructure Authority
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Program Overview
                                               
 
                                               
The program aims to improve the safety, reliability and efficiency of the country and regional rail network.
 
                                               
Major Works
                                               
 
                                               
New Works
                                               
 
                                               
Bridge Renewals
  Various     2011       2012       10,325               10,325  
Concrete Resleepering
  Various     2011       2012       1,804               1,804  
Conversion to Welded Track
  Various     2011       2012       3,665               3,665  
Level Crossing Safety Improvements
        Wimbledon     2011       2011       750               750  
Level Crossing Surface Upgrade
  Various     2011       2012       915               915  
Signalling System Upgrade
  Various     2011       2011       1,500               1,500  
Steel Resleepering
  Various     2011       2012       55,677               55,677  
 
Total new works
                                            74,636  
 
 
                                               
Work-In-Progress
                                               
 
                                               
Signalling and Train
  Various     2006       2012       29,630       28,982       648  
Control Systems
                                               
 
Total work-in-progress
                                            648  
 
Total, Major Works
                                            75,284  
Minor Works
                                            884  
 
Total, Country Rail Infrastructure Authority
                                      76,168  
 
     
5 - 2   Infrastructure Statement 2011-12

 


 

Transport
Public Transport Ticketing Corporation
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Program Overview
                                               
 
                                               
The program provides for the delivery of an electronic ticketing system (ETS) for all public transport operators in the Greater Sydney region. The estimated total cost published below is for the capital component during the delivery phase of the ETS program. These costs include the capitalisation of the PTTC’s direct costs which were previously classified and budgeted as operating expenses but not included in the prior year’s Budget Paper 4.
 
                                               
Major Works
                                               
 
                                               
Work-In-Progress
                                               
 
                                               
Electronic Ticketing System — Delivery Phase
  Various       2010       2015       329,183 *     65,306       110,263  
 
Total work-in-progress
                                            110,263  
 
Total, Major Works
                                            110,263  
Minor Works
                                            163  
 
Total, Public Transport Ticketing Corporation 110,426  
 
 
*   The $56 million increase from 2010-11 Budget includes capitalisation of project direct costs, primarily contractors, following advice from the Audit Office of NSW.
Rail Corporation New South Wales
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Program Overview
                                               
 
                                               
The program provides for additional and replacement rolling stock; enhancements to rail infrastructure for improved service reliability and safety; upgrades to stations to improve easy access, security and the provision of information to passengers.
 
                                               
Major Works
                                               
 
                                               
New Works
                                               
 
                                               
Easy Access Station Upgrades — Additional Program
  Various     2011       2015       60,000               7,500  
North West Rail Link
  Various     2011       * *                   92,000  
 
Total new works
                                            99,500  
 
 
**   To be determined following completion of scoping works.
     
Infrastructure Statement 2011-12   5 - 3

 


 

Transport
Rail Corporation New South Wales (cont)
                                                 
                            Estimated     Est. Expend     Allocation  
                            Total Cost     to 30-06-11     2011-12  
Project Description   Location     Start     Complete     $000     $000     $000  
 
Work-In-Progress
                                               
 
                                               
Assets and Facilities Safety and Security*
  Various     2004       2016               90,882       12,394  
Automatic Train Protection*
  Various     2008       2020               25,908       60,000  
Business Support Systems**
  Various     2004       2016               119,783       50,152  
Clearways
  Various     2004       2014       2,019,505       1,599,659       197,947  
Digital Train Radio*
  Various     2008       2014               61,198       50,000  
Easy Access Station Upgrades**
  Various     2010       2016               22,984       22,500  
Emu Plains Stabling*
        Emu Plains     2009       2017               26,118       15,000  
Hurstville Station Upgrade
      Hurstville     2007       2012       34,900       17,279       10,430  
Information Communications Technology Support Systems **
  Various     2004       2016               45,305       4,494  
Internal Emergency Door Release*
  Various     2006       2014       51,730       9,183       7,000  
Level Crossing Upgrades**
  Various     2004       2016               14,347       4,166  
Lidcombe to Granville - Corridor Upgrade*
  Various     2006       2019               32,594       18,161  
Mechanised Track Patrol
  Various     2010       2014       38,183       10,617       11,000  
Network Communications Systems**
  Various     2004       2016               39,334       12,257  
Oatley Sutherland Resignalling and Overhead Wiring
  Various     2005       2012       82,410       76,907       2,500  
Outer Suburban Cars - Tranche 3
  Various     2008       2013       473,800       295,106       130,000  
Park and Travel Safety**
  Various     2011       2015             22,498       16,924  
Passenger Information**
  Various     2004       2016               63,232       12,035  
Plant and Equipment
  Various     2004       2016               81,415       5,113  
Acquisitions**
                                               
 
*   The estimated cost of the project has not been included due to the commercially sensitive nature of the project.
 
**   Represents a portfolio of projects (generally in excess of $100 million), some of which are still in the planning phase or subject to tender and the details of which are commercial in confidence. Prior year’s expenditure on these programs reflects works in progress only.
     
5 - 4   Infrastructure Statement 2011-12

 


 

Transport
Rail Corporation New South Wales (cont)
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Power Supply**
  Various     2004       2016               272,092       80,940  
Rail Heritage Portfolio
  Various     2007       2016       34,885       33,884       1,000  
Rollingstock Upgrades**
  Various     2004       2016               47,516       15,115  
Signalling Improvements**
  Various     2004       2016               18,726       564  
Southern Sydney Freight Line — ARTC Interface
  Various     2004       2012       74,635       42,170       22,120  
Stabling Upgrades Preliminary Works**
  Various     2004       2016               11,576       2,680  
Station Development and Upgrades**
  Various     2009       2016               26,438       58,896  
Waratah Rollingstock - Enabling and Ancillary Works — Implementation***
  Various     2004       2013               420,812       105,842  
Wayside Protection Systems Upgrade
  Various     2006       2012       27,453       23,365       3,837  
Wollongong Stabling*
  Wollongong     2008       2013               11,126       10,500  
Wynyard Walk*
  Sydney     2010       2015               10,100       51,200  
 
Total work-in-progress
                                            994,767  
 
Total, Major Works
                                            1,094,267  
 
                                               
Minor Works
                                               
 
                                               
Asset Maintenance Works
                                            160,000  
Other Minor Works
                                            103,333  
Total, Minor Works
                                            263,333  
 
                                               
Public Private Partnerships
                                               
 
                                               
Leased Rollingstock — Waratahs
                                            358,064  
 
Total, Rail Corporation New South Wales
                                      1,715,664  
 
 
*   The estimated cost of the project has not been included due to the commercially sensitive nature of the project.
 
**   Represents a portfolio of projects (generally in excess of $100 million), some of which are still in the planning phase or subject to tender and the details of which are commercial in confidence. Prior year’s expenditure on these programs reflects works in progress only.
 
***   Total (operating and capital) whole of life project cost is $3.6 billion (net present cost).
     
Infrastructure Statement 2011-12   5 - 5

 


 

Transport
State Transit Authority
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Program Overview
                                               
 
                                               
The program provides for the development and maintenance of depots and the acquisition of bus related servicing equipment to meet corporate objectives of passenger growth and service delivery targets. (Bus acquisitions are met through the Department of Transport Capital Program).
 
                                               
Major Works
                                               
 
                                               
New Works
                                               
 
                                               
Depot Facilities
  Various     2011       2015       8,000               1,000  
Equipment for Depots
  Various     2011       2012       500               500  
Northern Region Capacity Upgrade
      Brookvale     2011       2012       750               750  
Safety Systems on Buses
  Various     2011       2014       1,275               220  
Security Systems on Buses
  Various     2011       2012       1,200               1,200  
 
Total new works
                                            3,670  
 
 
                                               
Work-In-Progress
                                               
 
                                               
Depot Facilities
  Various     2009       2013       1,300       78       1,000  
Depot Redevelopment
    Waverley     2010       2012       400       234       166  
PTIPS Bus Communications Upgrade
  Various     2010       2012       1,600       833       767  
Recommissioning of Tempe Depot
  Tempe     2009       2012       17,400       12,417       4,983  
Safety Systems at Depots
  Various     2009       2012       300       89       211  
 
Total work-in-progress
                                            7,127  
 
Total, Major Works
                                            10,797  
Minor Works
                                            4,000  
 
Total, State Transit Authority
                                            14,797  
 
     
5 - 6   Infrastructure Statement 2011-12

 


 

Transport
Sydney Ferries
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Program Overview
                                               
 
                                               
This program provides for the upgrade and refurbishment of ferry infrastructure and equipment.
 
                                               
Major Works
                                               
 
                                               
New Works
                                               
 
                                               
Circular Quay and Manly Hydraulic Ramp Replacement
  Sydney     2011       2013       5,050               2,666  
 
Total new works
                                            2,666  
 
Work-In-Progress
                                               
Balmain Western Corner Storage Upgrade
  Balmain     2007       2012       530       427       103  
Ferry Operations and Customer Information System
  Various     2007       2013       13,662       9,691       2,817  
Gangway Repairs and Replacement
  Various     2008       2019       1,029       515       129  
Upgrade of CCTV Wharf Infrastructure
  Various     2008       2019       1,453       631       103  
 
Total work-in-progress
                                            3,152  
 
Total, Major Works
                                            5,818  
Minor Works *
                                            14,043  
 
Total, Sydney Ferries
                                            19,861  
 
 
*   Includes capital maintenance.
     
Infrastructure Statement 2011-12   5 - 7

 


 

Transport
Transport Construction Authority
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Program Overview
                                               
 
                                               
The program delivers new, redeveloped and upgraded stations, interchanges, rail lines and a range of other public transport infrastructure.
 
                                               
Major Works
                                               
 
                                               
Work-In-Progress
                                               
 
                                               
Commuter Car Parking Program
  Various     2009       2012       242,400       217,738       24,662  
Commuter Car Parking and Interchange Program
  Various     2010       2013       80,473       19,604       46,458  
Epping to Chatswood Rail Line — Finalisation
  Various     2001       2012       2,332,000       2,302,536       29,464  
South West Rail Link
  Various     2007       2017       2,122,142       391,066       291,792  
 
Total work-in-progress
                                            392,376  
 
Total, Major Works
                                            392,376  
 
Total, Transport Construction Authority
                                      392,376  
 
     
5 - 8   Infrastructure Statement 2011-12

 


 

Water
Hunter Water Corporation
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Program Overview
                                               
 
                                               
The program provides for water and wastewater works in the Hunter region.
 
                                               
Water Related Projects
                                               
 
                                               
Major Works
                                               
 
                                               
Work-In-Progress
                                               
 
                                               
Additional Clear Water Tank at Dungog Water Treatment Plant
  Dungog     2008       2012       12,000       11,776       224  
Augmentation of Anna Bay Reservoir and Watermains
  Anna Bay     2008       2015       9,200       8,233       200  
Enhancement of Water Infrastructure
  Various     2005       2016       299,850       30,391       17,050  
Grahamstown Dam - Stage 2 and 3 Upgrades
  Tomago     2009       2029       61,500       20,911       100  
Replacement of the Chichester Trunk Gravity Watermain
  Various     2004       2012       17,800       16,360       1,440  
Information and Communication Technology Projects
  Newcastle     2008       2016       65,036       23,195       7,500  
Replacement or Upgrade - Asset Management and Enterprise Resource Planning Systems
  Newcastle     2009       2015       37,564       1,661       1,600  
Telemetry System Upgrade
  Various     2009       2017       10,100       529       1,800  
 
Total work-in-progress
                                            29,914  
 
Total, Major Works
                                            29,914  
Minor Works
                                            19,004  
 
Total, Water Related Projects
                                            48,918  
 
     
Infrastructure Statement 2011-12   5 - 9

 


 

Water
Hunter Water Corporation (cont)
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Environment Protection Related Projects
 
                                               
Major Works
                                               
 
                                               
New Works
                                               
 
                                               
Burwood Beach Wastewater
  Merewether     2011       2014       16,100               700  
Treatment Plant Disinfection
                                               
 
Total new works
                                            700  
 
 
                                               
Work-In-Progress
                                               
 
                                               
Clarencetown Wastewater System
  Clarence Town     2008       2012       13,000       12,098       902  
Enhancement of Sewerage Infrastructure
  Various     2001       2017       359,900       199,562       41,414  
Kooragang Island Recycled Water Plant
  Newcastle     2008       2013       68,400       5,301       1,000  
Newcastle System Upgrade Works — Stage 2
  Various     2009       2017       54,600       7       500  
Toronto Wastewater Treatment Inlet Upgrade
  Blackalls Park     2009       2013       11,400       4,270       6,000  
Williamtown Wastewater Transfer Scheme — Stage 1
  Williamtown     2009       2013       9,600       1,130       4,300  
 
Total work-in-progress
                                            54,116  
 
Total, Major Works
                                            54,816  
Minor Works
                                            29,467  
 
Total, Environment Protection Related Projects 84,283  
 
Total, Hunter Water Corporation
                                            133,201  
 
     
5 - 10   Infrastructure Statement 2011-12

 


 

Water
State Water Corporation
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Program Overview
                                               
 
                                               
The program provides for the maintenance and improvement of dams and other bulk water delivery infrastructure to meet safety, operational and environmental outcomes.
 
                                               
Major Works
                                               
 
                                               
New Works
                                               
 
                                               
Chaffey Augmentation
  Tamworth     2012       2014       45,067               2,500  
Fishways Downstream of Burrendong Dam
  Wellington     2012       2013       2,795               433  
Fishways Downstream of Copeton Dam
  Inverell     2011       2016       15,879               433  
 
Total new works
                                            3,366  
 
 
                                               
Work-In-Progress
                                               
 
                                               
Blowering Dam Upgrade - Phase 1
  Tumut     1998       2012       43,502       43,428       74  
Blowering Riparian Bypass
  Tumut     2011       2013       3,551       60       1,305  
Burrendong Dam Upgrade - Phase 1
  Lake Burrendong     1994       2016       49,849       17,834       2,570  
Chaffey Dam Upgrade - Phase 1
  Bowling Alley Point     1998       2014       22,653       19,578       771  
Copeton Dam Upgrade - Phase 1
  Copeton     1994       2016       75,783       19,310       26,470  
Fishways Downstream of Keepit Dam
  Gunnedah     2011       2014       16,706       535       1,530  
Integrated Surveillance Monitoring, Automation and Remote Telemetry (iSMART)
  Various     2010       2014       11,146       4,812       3,986  
Keepit Dam Upgrade - Phase 1
  Keepit     1994       2016       133,697       64,726       10,406  
Murray Pilot Metering Project and Other River Metering
  Various     2011       2017       113,776       301       7,713  
Replace Pipes Fish River
  Lithgow     2010       2012       7,600       2,105       5,495  
Split Rock Dam Upgrade - Phase 1 and Phase 2
  Manilla     2005       2013       10,278       2,525       7,649  
     
Infrastructure Statement 2011-12   5 - 11

 


 

Water
State Water Corporation (cont)
                                                 
                            Estimated     Est. Expend     Allocation  
                            Total Cost     to 30-06-11     2011-12  
Project Description   Location     Start     Complete     $000     $000     $000  
 
Water For Rivers — Computer Aided River Management
  Various     2011       2012       4,434       1,171       3,263  
Water For Rivers — Other Water Saving Projects
  Various     2010       2012       18,665       1,555       17,110  
Water for Rivers Metering
  Various     2011       2012       13,063       640       12,423  
Wyangala Dam Upgrade - Phase 1
      Wyangala     1998       2016       53,826       8,051       5,356  
 
Total work-in-progress
                                            106,121  
 
Total, Major Works
                                            109,487  
Minor Works
                                            26,912  
 
Total, State Water Corporation
                                            136,399  
 
     
5 - 12   Infrastructure Statement 2011-12

 


 

Water
Sydney Catchment Authority
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Program Overview
 
                                               
The program provides for the upgrading and renewal of dams, pipelines and other catchment infrastructure related to supply of bulk raw water to Sydney, Illawarra and Blue Mountains region.
 
                                               
Major Works
                                               
 
                                               
Work-In-Progress
                                               
 
                                               
Catchments Upgrade
  Various     1998       2021       23,433       7,539       675  
 
                                               
General Upgrades
  Various     1999       2021       142,390       40,325       4,116  
 
                                               
Metropolitan Dams Upgrade
  Various     1998       2018       23,936       7,384       330  
 
                                               
Metropolitan Water Plan
  Various     2004       2025       1,045,768       227,732       865  
 
                                               
Prospect Reservoir Upgrade
  Prospect     1998       2014       80,413       62,728       713  
 
                                               
Shoalhaven System Upgrade
  Various     1998       2018       52,912       12,474       5,711  
 
                                               
Upper Canal Upgrade
  Various     1998       2027       2,102,089       17,586       200  
 
                                               
Warragamba Dam Auxiliary Spillway
  Warragamba     1996       2012       165,767       165,001       766  
 
                                               
Warragamba Dam General Upgrade
  Warragamba     1997       2017       76,588       37,952       139  
 
                                               
 
Total, Major Works
                                            13,515  
 
                                               
Minor Works
                                            7,349  
 
 
                                               
Total, Sydney Catchment Authority
                                            20,864  
 
     
Infrastructure Statement 2011-12   5 - 13

 


 

Water
Sydney Water Corporation
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Program Overview
                                               
 
                                               
The program is to meet operational standards and environmental regulations, to provide for urban growth, increase customer satisfaction, business efficiency and the value of the business.
 
                                               
Water Related Projects
                                               
 
                                               
Major Works
                                               
 
                                               
Work-In-Progress
                                               
 
                                               
Critical Watermain Program
  Various     1998       2022       780,000       165,498       33,100  
 
                                               
Information Technology Projects
  Various     2001       2022       820,000       359,947       58,500  
 
                                               
Maintain Water Distribution Systems
  Various     1995       2022       2,200,000       1,042,904       105,300  
 
                                               
Maintenance Plant Renewals
  Various     2001       2022       50,000       23,187       2,300  
 
                                               
Property Management and Acquisition
  Various     2001       2022       500,000       307,599       33,700  
 
                                               
Recycled Water Projects
  Various     2004       2022       500,000       92,421       28,700  
 
                                               
Water Meter Replacement Program
  Various     1995       2022       250,000       97,314       11,600  
 
                                               
Western Sydney Recycled Water Initiative
  Various     2006       2012       204,500       200,000       4,500  
 
                                               
 
Total, Water Related Projects
                                            277,700  
 
 
                                               
Environment Protection Related Projects
                                               
 
                                               
Major Works
                                               
 
                                               
Work-In-Progress
                                               
 
                                               
Growth Works to Service Urban Development
  Various     1995       2022       2,400,000       523,957       145,800  
 
                                               
Priority Sewerage Program Agnes Banks and Londonderry
  Various     2008       2013       24,200       22,100       1,800  
 
                                               
Priority Sewerage Program Appin
  Appin     2009       2014       77,900       9,000       41,200  
 
                                               
Priority Sewerage Program Freemans Reach, Glossodia and Wilberforce
  Various     2008       2013       117,800       105,300       10,900  
     
5 - 14   Infrastructure Statement 2011-12

 


 

Water
Sydney Water Corporation (cont)
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Environment Protection Related Projects (cont)
 
                                               
Priority Sewerage
  Various     2008       2013       49,800       45,400       3,800  
Program Hawkesbury
                                               
Heights and Yellow Rock
                                               
 
                                               
Priority Sewerage
  Various     2005       2016       15,001       6,601       2,400  
Program Stage 2 - Initial Estimates
                                               
 
                                               
Sewage Overflow Abatement
  Various     1995       2022       1,400,000       684,159       71,900  
 
                                               
Sewer Network Reliability Upgrades
  Various     1995       2022       1,850,000       848,725       71,600  
 
                                               
Stormwater Asset Renewals
  Various     2008       2022       80,000       9,700       4,000  
 
                                               
Upgrade Reliability of Sewage Treatment Plants
  Various     1995       2022       1,000,000       368,061       75,200  
 
                                               
Vaucluse Diamond Bay Strategy
  Various     2011       2017       89,000       300       1,000  
 
                                               
 
Total, Environment Protection Related Projects
                                            429,600  
 
Total, Sydney Water Corporation
                                            707,300  
 
     
Infrastructure Statement 2011-12   5 - 15

 


 

Ports
Newcastle Port Corporation
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Program Overview
 
                                               
The program provides for port development and growth in trade.
 
                                               
Major Works
 
                                               
New Works
 
                                               
Construction of Channel
  Carrington                                        
Berth Fender
  (Newcastle)     2011       2012       550               550  
 
                                               
Dyke 2 Berth Walkway
  Carrington                                        
Replacement
  (Newcastle)     2011       2012       600               600  
 
Total new works
                                            1,150  
 
Work-In-Progress
                                               
 
Bulk Liquid Precinct
  Mayfield                                        
Infrastructure Services
  (Newcastle)     2010       2013       2,415       15       1,200  
 
CCTV Security System
  Carrington                                        
 
  (Newcastle)     2010       2013       1,257       17       740  
Information Management System
  Newcastle     2010       2012       523       23       500  
 
                                               
Port Centre Construction
  Newcastle     2008       2012       3,952       452       3,500  
 
                                               
Rail Realignment
  Mayfield
(Newcastle)
    2010       2012       1,011       761       250  
 
                                               
Replace Vessel Traffic Information System
  Newcastle     2010       2012       974       24       950  
 
                                               
Strategic Dredging
  Newcastle     2010       2012       618       218       400  
Approvals for Walsh
                                               
Point and Mayfield
                                               
 
                                               
 
Total work-in-progress
                                            7,540  
 
 
                                               
Total, Major Works
                                            8,690  
Minor Works
                                            2,190  
 
 
                                               
Total, Newcastle Port Corporation
                                            10,880  
 
     
5 - 16   Infrastructure Statement 2011-12

 


 

Ports
Port Kembla Port Corporation
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Program Overview
                                               
 
                                               
The program provides for further development of port lands and provision of port infrastructure.
 
                                               
Major Works
                                               
 
                                               
New Works
                                               
 
                                               
Land Purchases - Adjacent to Outer Harbour
  Port Kembla     2012       2013       16,000               6,000  
 
                                               
Level 4 Building Extensions
  Port Kembla     2011       2012       400               400  
 
                                               
Outer Harbour Stage 1A - Dredging and Complete Reclamation
  Port Kembla     2012       2015       117,250               250  
 
                                               
Rail Turnout Replacements and Renewals
  Port Kembla     2011       2021       9,500               500  
 
                                               
Ship and Tug Training Simulator
  Port Kembla     2012       2012       300               300  
 
                                               
 
Total new works
                                            7,450  
 
 
                                               
Work-In-Progress
                                               
 
                                               
Inner Harbour Rail Upgrade
  Port Kembla     2010       2015       3,500       1,068       1,000  
 
                                               
Outer Harbour Rail Track Renewal
  Port Kembla     2010       2016       9,000       1,101       1,500  
 
                                               
Outer Harbour Stage 1A - New Bulk Goods Berth Reclamation
  Port Kembla     2008       2012       24,500       6,038       18,462  
 
                                               
Shipping Management System
  Port Kembla     2006       2011       269       264       5  
 
                                               
Tug Fleet Base
  Port Kembla     2010       2012       16,500       7,748       8,752  
 
                                               
 
Total work-in-progress
                                            29,719  
 
 
                                               
Total, Major Works
                                            37,169  
 
Minor Works
                                            650  
 
                                               
 
Total, Port Kembla Port Corporation
                                            37,819  
 
     
Infrastructure Statement 2011-12   5 - 17

 


 

Ports
Sydney Ports Corporation
                                                 
                Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Program Overview
                                               
 
                                               
The program provides for business growth of the commercial ports in Botany Bay and Sydney Harbour and renewal of assets to meet ongoing operational requirements.
 
                                               
Major Works
                                               
 
                                               
New Works
                                               
 
                                               
Overseas Passenger
  Sydney     2012       2017       24,249               1,021  
Terminal Capacity Upgrades
                                               
 
                                               
 
Total new works
                                            1,021  
 
 
                                               
Work-In-Progress
                                               
 
                                               
Aerobridge Gangway for Overseas Passenger Terminal
  Sydney     2005       2011       4,870       4,173       697  
 
                                               
Intermodal Logistics Centre Development
  Enfield     2000       2012       206,547       93,583       108,839  
 
                                               
Operations Centre
  Port Botany     2005       2011       14,383       14,379       4  
 
                                               
Passenger Cruise Terminal at White Bay 5*
  Balmain     2007       2012             3,351       53,633  
 
                                               
Pilot Vessel Replacements*
  Port Botany     2010       2016             275       5,533  
 
                                               
Port Botany Expansion
  Port Botany     2000       2012       725,546       618,553       73,543  
 
                                               
Port Botany Landside Improvement Strategy*
  Port Botany     2010       2021             2,413       15,617  
 
                                               
Second Bulk Liquids Berth
  Port Botany     2004       2012       83,792       7,462       52,879  
 
                                               
Vessel Traffic Management and Communications System
  Port Botany     2009       2011       12,111       11,244       867  
 
                                               
 
Total work-in-progress
                                            311,612  
 
 
                                               
Total, Major Works
                                            312,633  
 
Minor Works
                                            27,643  
 
                                               
 
Total, Sydney Ports Corporation
                                            340,276  
 
 
*   The estimated cost for these projects is subject to a tendering process — amounts have therefore not been quoted due to their commercially sensitive nature.
     
5 - 18   Infrastructure Statement 2011-12

 


 

Housing
City West Housing Pty Limited
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Program Overview
                                               
 
                                               
The program provides for the development and construction of 210 units of affordable housing over the three years to 2013-14.
 
                                               
Major Works
                                               
 
                                               
New Works
                                               
 
                                               
Affordable Housing — Cowper Street Glebe
  Glebe     2011       2014       32,338               4,218  
 
                                               
Affordable Housing - Joynton Square Avenue Green
  Zetland     2011       2014       44,225               13,415  
 
                                               
 
Total new works
                                            17,633  
 
 
                                               
Total, Major Works
                                            17,633  
 
Minor Works
                                            469  
 
                                               
 
Total, City West Housing Pty Limited
                                            18,102  
 
New South Wales Land and Housing Corporation
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Program Overview
                                               
 
                                               
The program provides for affordable social housing in New South Wales. The program will enable the commencement of 529 new dwellings and the completion of 1,989 dwellings of general public and community accommodation. The program also includes provision for the improvement of existing housing stock, renewal of public housing areas, modification and upgrade of older dwellings, health and safety upgrades.
 
                                               
Major Works
                                               
 
                                               
New Works
                                               
 
                                               
Administrative Assets — Information Technology
  Various     2011       2012       4,266               4,266  
 
                                               
Office Accommodation and Administrative Assets
  Various     2011       2012       10,715               10,715  
     
Infrastructure Statement 2011-12   5 - 19

 


 

Housing
New South Wales Land and Housing Corporation (cont)
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Social Housing – New Supply
  Various     2011       2014       176,759               78,280  
 
                                               
Social Housing Asset Improvement
  Various     2011       2012       211,855               211,855  
 
                                               
 
Total new works
                                            305,116  
 
 
                                               
Work-In-Progress
                                               
 
                                               
Crisis Accommodation
  Various     2011       2011       14,106       14,053       53  
 
                                               
Nation Building Economic Stimulus
Plan — Stage 2
  Various     2009       2012       1,658,191       1,609,817       48,374  
 
                                               
Social Housing – New Supply
  Various     2010       2012       317,813       177,724       140,089  
 
                                               
 
Total work-in-progress
                                            188,516  
 
 
                                               
Total, Major Works
                                            493,632  
 
Minor Works
                                            3,745  
 
GST Refund Associated with the Stimulus Plan
                                            (48,374 )
 
                                               
 
Total, New South Wales Land and Housing Corporation
                                            449,003  
 
Teacher Housing Authority
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Program Overview
                                               
 
                                               
The program provides for the construction, acquisition and upgrading of housing in remote areas of the State where private rental markets do not adequately meet teacher accommodation needs.
 
                                               
Major Works
                                               
 
                                               
New Works
                                               
 
                                               
New Houses to Meet Demand Growth
  Various     2011       2012       3,830               2,710  
 
                                               
 
Total new works
                                            2,710  
 
     
5 - 20   Infrastructure Statement 2011-12

 


 

Housing
Teacher Housing Authority (cont)
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Work-In-Progress
                                               
 
                                               
New Houses to Meet Demand Growth
  Various     2009       2012       11,293       4,935       6,358  
 
                                               
 
Total work-in-progress
                                            6,358  
 
 
                                               
Total, Major Works
                                            9,068  
Minor Works
                                            174  
 
 
                                               
Total, Teacher Housing Authority
                                            9,242  
 
     
Infrastructure Statement 2011-12   5 - 21

 


 

Property
Forests NSW
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Program Overview
                                               
 
                                               
The program provides for the establishment of infrastructure to support softwood and hardwood plantations. It also includes purchases of fleet vehicles and equipment.
 
                                               
Major Works
                                               
 
                                               
New Works
                                               
 
                                               
Buildings and Installations
  Bombala     2012       2012       200               200  
 
                                               
Plantation Establishment - Softwoods (Land)
  Various     2012       2013       10,000               7,500  
 
                                               
Seedling Support Frames
  Unknown     2012       2015       133               1  
 
                                               
 
Total new works
                                            7,701  
 
 
                                               
Work-In-Progress
                                               
 
                                               
Construction – Buildings and Installations
  Castle Hill     2010       2012       420       130       290  
 
                                               
Construction – Other Assets
  Tumut     2007       2013       1,431       1,321       80  
 
                                               
 
Total work-in-progress
                                            370  
 
 
                                               
Total, Major Works
                                            8,071  
Minor Works
                                            5,162  
 
 
                                               
Total, Forests NSW
                                            13,233  
 
     
5 - 22   Infrastructure Statement 2011-12

 


 

Property
Hunter Region Sporting Venues Authority
                                                 
                            Estimated   Est. Expend   Allocation
                            Total Cost   to 30-06-11   2011-12
Project Description   Location   Start   Complete   $000   $000   $000
 
Program Overview
                                               
 
                                               
The program provides upgraded facilities for spectators, players, hirers and media in the staging of events at Ausgrid Stadium.
 
                                               
Major Works
                                               
 
                                               
Work-In-Progress
                                               
 
                                               
Western Grandstand — Ausgrid Stadium
  Broadmeadow     2007       2011       80,753       77,627       3,126  
 
                                               
 
Total work-in-progress
                                            3,126  
 
 
                                               
Total, Major Works
                                          3,126  
 
                                               
 
Total, Hunter Region Sporting Venues Authority
                                          3,126  
 
Illawarra Venues Authority
                                                 
                            Estimated     Est. Expend     Allocation  
                            Total Cost     to 30-06-11     2011-12  
Project Description   Location     Start     Complete     $000     $000     $000  
 
Program Overview
                                               
 
                                               
The program provides for the upgrade, refurbishment and maintenance of the WIN Stadium, Wollongong and the Wollongong Entertainment Centre.
 
                                               
Major Works
                                               
 
                                               
Work-In-Progress
                                               
 
                                               
Western Grandstand – WIN Stadium
  Wollongong     2009       2011       31,000       15,403       15,597  
 
                                               
 
Total work-in-progress
                                            15,597  
 
 
                                               
Total, Major Works
                                            15,597  
Minor Works
                                            228  
 
                                               
 
Total, Illawarra Venues Authority
                                            15,825  
 
The following agencies have a Minor Works Program only.
Landcom
                                            6,237  
     
Infrastructure Statement 2011-12   5 - 23

 


 

Property
Parramatta Stadium Trust
                                                 
                            Estimated     Est. Expend     Allocation  
                            Total Cost     to 30-06-11     2011-12  
Project Description   Location     Start     Complete     $000     $000     $000  
 
Program Overview
 
                                               
The program provides facilities for spectators, players, hirers and media and operational requirements to stage events at Parramatta Stadium.
 
                                               
Major Works
 
                                               
New Works
 
                                               
Stadium Disability Access Upgrades
  North Parramatta     2011       2011       510               510  
 
                                               
 
Total new works
                                            510  
 
 
                                               
Total, Major Works
                                            510  
 
                                               
Minor Works
                                            976  
 
                                               
 
Total, Parramatta Stadium Trust
                                            1,486  
 
Sydney Cricket and Sports Ground Trust
                                                 
                            Estimated     Est. Expend     Allocation  
                            Total Cost     to 30-06-11     2011-12  
Project Description   Location     Start     Complete     $000     $000     $000  
 
Program Overview
 
                                               
The program provides facilities for spectators, players, hirers and media and operational requirements to stage events at the Sydney Cricket Ground and Sydney Football Stadium.
 
                                               
Major Works
 
                                               
New Works
 
                                               
Control Room Upgrade
  Moore Park     2011       2012       306               306  
 
                                               
Forecourt Redevelopment — Football Stadium
  Moore Park     2011       2012       370               370  
 
                                               
Kippax Lake Training Field Extension
  Moore Park     2011       2012       350               350  
     
5 - 24   Infrastructure Statement 2011-12

 


 

Property
Sydney Cricket and Sports Ground Trust (cont)
                                                 
                            Estimated     Est. Expend     Allocation  
                            Total Cost     to 30-06-11     2011-12  
Project Description   Location     Start     Complete     $000     $000     $000  
 
Membership Database Upgrade
  Moore Park     2011       2012       250               250  
 
                                               
Private Suites Upgrade — Football Stadium
  Moore Park     2011       2012       400               400  
 
                                               
Way Finding Signage — Cricket Ground
  Moore Park     2011       2012       250               250  
 
Total new works
                                            1,926  
 
 
                                               
Work-In-Progress
                                               
 
                                               
New Video Screen — Football Stadium Forecourt
  Moore Park     2011       2011       630       120       510  
 
                                               
Rugby League Central Building Site Works
  Moore Park     2011       2011       554       54       500  
 
                                               
 
Total work-in-progress
                                            1,010  
 
 
                                               
Total, Major Works
                                            2,936  
 
                                               
Minor Works
                                            5,751  
 
                                               
 
Total, Sydney Cricket and Sports Ground Trust
                                            8,687  
 
Sydney Harbour Foreshore Authority
                                                 
                            Estimated     Est. Expend     Allocation  
                            Total Cost     to 30-06-11     2011-12  
Project Description   Location     Start     Complete     $000     $000     $000  
 
Program Overview
 
                                               
The program comprises enhancements to lift the profile and encourage greater use of Sydney Harbour Foreshore assets, including Darling Harbour and The Rocks.
 
                                               
Major Works
 
                                               
New Works
 
                                               
Marine Structures Upgrades
  Sydney     2011       2021       13,399               2,355  
 
                                               
Sydney Convention and Exhibition Centre — Finance Leases
  Sydney     2011       2021       5,697               1,036  
     
Infrastructure Statement 2011-12   5 - 25

 


 

Property
Sydney Harbour Foreshore Authority (cont)
                                                 
                            Estimated     Est. Expend     Allocation  
                            Total Cost     to 30-06-11     2011-12  
Project Description   Location     Start     Complete     $000     $000     $000  
 
Sydney Convention and Exhibition Centre — Interior Upgrade
  Sydney     2011       2013       3,250               950  
 
                                               
Ultimo Pedestrian Network Upgrade
  Sydney     2011       2013       2,930               280  
 
                                               
 
Total new works
                                            4,621  
 
 
                                               
Work-In-Progress
                                               
 
                                               
Public Domain Upgrade Program
  Sydney     2009       2021       47,918       2,000       5,489  
 
                                               
Sydney Convention and Exhibition Centre — Air Conditioning Upgrade
  Sydney     2010       2015       9,949       611       2,400  
 
                                               
Sydney Convention and Exhibition Centre — Annual Capital Replacement Program
  Sydney     2004       2021       103,627       40,699       8,097  
 
                                               
Sydney Convention and Exhibition Centre — Parkside Rooms Refurbishment
  Sydney     2007       2012       8,673       8,335       338  
 
                                               
White Bay Power Station Heritage Conservation Works
  Rozelle     2011       2012       3,008       8       3,000  
 
                                               
 
Total work-in-progress
                                            19,324  
 
 
                                               
Total, Major Works
                                            23,945  
 
                                               
Minor Works
                                            433  
 
                                               
 
Total, Sydney Harbour Foreshore Authority
                                            24,378  
 
     
5 - 26   Infrastructure Statement 2011-12

 


 

Property
Sydney Opera House
                                                 
                            Estimated     Est. Expend     Allocation  
                            Total Cost     to 30-06-11     2011-12  
Project Description   Location     Start     Complete     $000     $000     $000  
 
Program Overview
 
                                               
This program provides for the upgrade, refurbishment and maintenance of the Sydney Opera House.
 
                                               
Major Works
 
                                               
New Works
 
                                               
Upgrade of Lifts and Escalators
  Sydney     2012       2015       18,537               1,177  
 
                                               
Upgrade of the Stage Management System
  Sydney     2012       2014       8,555               3,135  
 
                                               
 
Total new works
                                            4,312  
 
 
                                               
Work-In-Progress
                                               
 
                                               
Vehicle Access and Pedestrian Safety Project
  Sydney     2011       2014       149,338       8,218       47,336  
 
                                               
 
Total work-in-progress
                                            47,336  
 
 
                                               
Total, Major Works
                                            51,648  
 
                                               
Minor Works
                                            5,950  
 
                                               
 
Total, Sydney Opera House
                                            57,598  
 
     
Infrastructure Statement 2011-12   5 - 27

 


 

Other
Waste Assets Management Corporation
                                                 
                            Estimated     Est. Expend     Allocation  
                            Total Cost     to 30-06-11     2011-12  
Project Description   Location     Start     Complete     $000     $000     $000  
 
Program Overview
 
                                               
Program provides for planned expansion of landfill capacity in Western Sydney.
 
                                               
Major Works
 
                                               
New Works
 
                                               
Environmental Systems
  Various     2011       2015       1,740               320  
Plant and Equipment Replacement
  Various     2011       2015       4,343               1,628  
 
Total new works
                                            1,948  
 
 
                                               
Work-In-Progress
                                               
 
                                               
Landfill Site Development
  Smithfield     2010       2015       11,479       1,823       8,756  
 
Total work-in-progress
                                            8,756  
 
 
                                               
Total, Major Works
                                            10,704  
 
                                               
Minor Works
                                            285  
 
                                               
 
Total, Waste Assets Management Corporation                     10,989  
 
     
5 - 28   Infrastructure Statement 2011-12

 


 

Other
Zoological Parks Board
                                                 
                            Estimated     Est. Expend     Allocation  
                            Total Cost     to 30-06-11     2011-12  
Project Description   Location     Start     Complete     $000     $000     $000  
 
Program Overview
 
                                               
The Master Plan capital program primarily comprises the construction and restoration of exhibits at Taronga and Western Plains Zoos.
 
                                               
Major Works
 
                                               
Work-In-Progress
 
                                               
Master Plan Implementation — Taronga Zoo
  Mosman     2001       2015       227,208       200,185       9,240  
 
                                               
Master Plan Implementation - Western Plains Zoo
  Dubbo     2001       2015       21,732       20,112       455  
 
                                               
 
Total work-in-progress
                                            9,695  
 
 
                                               
Total, Major Works
                                            9,695  
 
                                               
Minor Works
                                            500  
 
                                               
 
Total, Zoological Parks Board                     10,195  
 
     
Infrastructure Statement 2011-12   5 - 29

 


 

Competitive Government Sector
Competitive Government Sector
                                                 
                            Estimated     Est. Expend     Allocation  
                            Total Cost     to 30-06-11     2011-12  
Project Description   Location     Start     Complete     $000     $000     $000  
Program Overview
 
                                               
This program comprises works undertaken by the electricity generators and distributors and TransGrid. Given the competitive nature of works undertaken by these agencies, individual project details are treated as commercial in confidence and are not disclosed below. An overview of the capital program of these agencies is provided in Chapter 3 of this Budget Paper.
 
                                               
 
Total, Competitive Government Sector             4,119,191  
 
     
5 - 30   Infrastructure Statement 2011-12

 


 

Chart and Table List
                 
            Page  
Chapter 1 Infrastructure Overview
               
 
               
Infrastructure Investment Summary
  Table 1.1     1 - 1  
Total State Sector Infrastructure Investment 2011-12: by Policy Area
  Chart 1.1     1 - 3  
State Infrastructure Investment 2011-12
  Chart 1.2     1 - 5  
Total State Sector Infrastructure Investment, 2011-12 to 2014-15: by Sector
  Chart 1.3     1 - 6  
Total State Infrastructure Investment 2005-06 — 2014-15
  Chart 1.4     1 - 8  
General Government Sector Infrastructure
  Table 1.2     1 - 9  
Total State Sector Infrastructure Investment
  Table 1.3     1 - 9  
State Owned Physical Assets: Value by Sector
  Table 1.4     1 - 12  
State Owned Physical Assets: Distribution by Category as at 30 June 2010
  Chart 1.5     1 - 13  
State Owned Infrastructure: Percentage Distribution by Agency as at 30 June 2010
  Chart 1.6     1 - 14  
Value of Agencies’ Physical Assets as at 30 June 2010
  Table 1.5     1 - 15  
General Government
            1 - 15  
Public Trading Enterprise
            1 - 17  
Maintenance Expenses
  Table 1.6     1 - 18  
 
               
Chapter 2 Infrastructure Policies and Strategies
               
 
               
HIIF Four Year Funding
  Table 2.1     2 - 5  
     