EX-99.4 5 d109340dex994.htm EX-99.4 EX-99.4
Exhibit 99.4
Management’s Discussion
and Analysis (“MD&A”)

Management’s Discussion and Analysis (“MD&A”) is intended to help the reader understand Barrick Gold Corporation (“Barrick”, “we”, “our”, the “Company” or the “Group”), our operations, financial performance and the present and future business environment. This MD&A, which has been prepared as of February 17, 2021, should be read in conjunction with our audited consolidated financial statements (“Financial Statements”) for the year ended December 31, 2020. Unless otherwise indicated, all amounts are presented in US dollars.
For the purposes of preparing our MD&A, we consider the materiality of information. Information is considered material if: (i) such information results in, or would reasonably be expected to result in, a significant change in the market price or value of our shares; (ii) there is a substantial likelihood that a reasonable investor would
consider it important in making an investment decision; or (iii) it would significantly alter the total mix of information available to investors. We evaluate materiality with reference to all relevant circumstances, including potential market sensitivity.    
Continuous disclosure materials, including our most recent Form 40-F/Annual Information Form, annual MD&A, audited consolidated financial statements, and Notice of Annual Meeting of Shareholders and Proxy Circular will be available on our website at www.barrick.com, on SEDAR at www.sedar.com and on EDGAR at www.sec.gov. For an explanation of terminology unique to the mining industry, readers should refer to the glossary on page 135.


Cautionary Statement on Forward-Looking Information
 
Certain information contained or incorporated by reference in this MD&A, including any information as to our strategy, projects, plans or future financial or operating performance, constitutes “forward-looking statements”. All statements, other than statements of historical fact, are forward-looking statements. The words “believe”, “expect”, “anticipate”, “vision”, “target”, “plan”, “opportunities”, “objective”, “pursuit”, “assume”, “intend”, “intention”, “project”, “goal”, “continue”, “budget”, “estimate”, “potential”, “strategy”, “prospective”, “following”, “future”, “aim”, “may”, “will”, “can”, “could”, “would” and similar expressions identify forward-looking statements. In particular, this MD&A contains forward-looking statements including, without limitation, with respect to: Barrick’s goal to be the world’s most valued gold mining business; Barrick’s forward-looking production guidance; estimates of future cost of sales per ounce for gold and per pound for copper, total cash costs per ounce and C1 cash costs per pound, and all-in sustaining costs per ounce/pound; cash flow forecasts; projected capital, operating and exploration expenditures; mine life and production rates; Barrick’s engagement with local communities to manage the Covid-19 pandemic; potential mineralization and metal or mineral recoveries; our ability to identify, invest in and develop potential Tier One, Tier Two and Strategic Assets; our strategies and plans with respect to environmental matters, including climate change, greenhouse gas emissions reduction targets, and tailings storage facility management projects; our future plans, growth potential, financial strength, investments and overall strategy, including with respect to dispositions of non-core assets, maximizing the long-term value of our strategic copper business, and our participation in future consolidation of the gold industry; the potential impact of proposed changes to Nevada’s Net Proceeds of Minerals tax on Nevada Gold Mines and Barrick’s engagement with affected stakeholders to reach a solution that secures the long-term viability of the Nevada mining industry; our plans
and expected completion and benefits of our growth projects, including construction of twin exploration declines at Goldrush, the Turquoise Ridge Third Shaft, Pueblo Viejo plant and tailings facility expansion, Bulyanhulu production ramp-up, Zaldívar chloride leach project, and Veladero power transmission project; our ability to convert resources into reserves; the proposed return of capital distribution, including the timing and amount of the distribution; the partnership between Barrick and the Government of Tanzania (“GoT”) and the agreement to resolve all outstanding disputes between Acacia and the GoT; Barrick and Barrick Niugini Limited’s response to the government of Papua New Guinea’s decision not to extend Porgera’s special mining lease and to the Internal Revenue Commission’s proposed tax adjustments; the agreement in principle regarding arrangements for a new Porgera partnership with Papua New Guinea, and efforts to reach a binding memorandum of agreement; the duration of the temporary suspension of operations at Porgera; asset sales, joint ventures and partnerships; our economic and social development priorities within our host communities, including local hiring, procurement, training and community development initiatives; our digital innovation initiatives; and expectations regarding future price assumptions, financial performance and other outlook or guidance.
Forward-looking statements are necessarily based upon a number of estimates and assumptions including material estimates and assumptions related to the factors set forth below that, while considered reasonable by the Company as at the date of this MD&A in light of management’s experience and perception of current conditions and expected developments, are inherently subject to significant business, economic and competitive uncertainties and contingencies. Known and unknown factors could cause actual results to differ materially from those projected in the forward-looking statements and undue reliance should not be placed on such statements
BARRICK YEAR-END 2020
1
MANAGEMENT’S DISCUSSION AND ANALYSIS


and information. Such factors include, but are not limited to: fluctuations in the spot and forward price of gold, copper or certain other commodities (such as silver, diesel fuel, natural gas and electricity); the speculative nature of mineral exploration and development; changes in mineral production performance, exploitation and exploration successes; risks associated with projects in the early stages of evaluation and for which additional engineering and other analysis is required; disruption of supply routes which may cause delays in construction and mining activities at Barrick’s more remote properties; diminishing quantities or grades of reserves; increased costs, delays, suspensions and technical challenges associated with the construction of capital projects; operating or technical difficulties in connection with mining or development activities, including geotechnical challenges and disruptions in the maintenance or provision of required infrastructure and information technology systems; failure to comply with environmental and health and safety laws and regulations; non-renewal of key licences by governmental authorities, including non-renewal of Porgera’s Special Mining Lease; changes in national and local government legislation, taxation, controls or regulations and/or changes in the administration of laws, policies and practices; expropriation or nationalization of property and political or economic developments in Canada, the United States and other jurisdictions in which the Company or its affiliates do or may carry on business in the future; timing of receipt of, or failure to comply with, necessary permits and approvals; uncertainty whether some or targeted investments and projects will meet the Company’s capital allocation objectives and internal hurdle rate; the impact of global liquidity and credit availability on the timing of cash flows and the values of assets and liabilities based on projected future cash flows; adverse changes in our credit ratings; the impact of inflation; fluctuations in the currency markets; changes in U.S. dollar interest rates; risks arising from holding derivative instruments; lack of certainty with respect to foreign legal systems, corruption and other factors that are inconsistent with the rule of law; risks associated with illegal and artisanal mining; risks associated with new diseases, epidemics and pandemics, including the effects and potential effects of the global Covid-19 pandemic; damage to the Company’s reputation due to the actual or perceived occurrence of any number of events, including negative publicity with respect to the Company’s handling of environmental matters or dealings with community groups, whether true or not; the possibility that future exploration results will not be consistent with the Company’s expectations; risks that exploration data may be incomplete and considerable additional work may be required to complete further evaluation, including but not limited to drilling, engineering and socioeconomic studies and investment; risk of loss due to acts of war, terrorism, sabotage and civil disturbances; litigation; contests over title to properties, particularly title to undeveloped properties, or over access to water, power and other required infrastructure; business opportunities that may be presented to, or pursued by, the Company; risks associated with the fact that certain of the initiatives described in this MD&A are still in the early stages and may not materialize; whether benefits expected from recent transactions are realized; our ability to successfully integrate acquisitions or complete divestitures; risks associated with working with partners in jointly controlled assets; employee relations
including loss of key employees; increased costs and physical risks, including extreme weather events and resource shortages, related to climate change; and availability and increased costs associated with mining inputs and labor. Barrick also cautions that its 2021 guidance may be impacted by the unprecedented business and social disruption caused by the spread of Covid-19. In addition, there are risks and hazards associated with the business of mineral exploration, development and mining, including environmental hazards, industrial accidents, unusual or unexpected formations, pressures, cave-ins, flooding and gold bullion, copper cathode or gold or copper concentrate losses (and the risk of inadequate insurance, or inability to obtain insurance, to cover these risks).
Many of these uncertainties and contingencies can affect our actual results and could cause actual results to differ materially from those expressed or implied in any forward-looking statements made by, or on behalf of, us. Readers are cautioned that forward-looking statements are not guarantees of future performance. All of the forward-looking statements made in this MD&A are qualified by these cautionary statements. Specific reference is made to the most recent Form 40-F/Annual Information Form on file with the SEC and Canadian provincial securities regulatory authorities for a more detailed discussion of some of the factors underlying forward-looking statements and the risks that may affect Barrick’s ability to achieve the expectations set forth in the forward-looking statements contained in this MD&A. We disclaim any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as required by applicable law.

Use of Non-GAAP Financial Performance Measures
We use the following non-GAAP financial performance measures in our MD&A:
“adjusted net earnings”
“free cash flow”
“EBITDA”
“adjusted EBITDA”
“total cash costs per ounce”
“C1 cash costs per pound”
“all-in sustaining costs per ounce/pound”
“all-in costs per ounce” and
“realized price”

For a detailed description of each of the non-GAAP measures used in this MD&A and a detailed reconciliation to the most directly comparable measure under International Financial Reporting Standards (“IFRS”), please refer to the Non-GAAP Financial Performance Measures section of this MD&A on pages 96 to 122. Each non-GAAP financial performance measure has been annotated with a reference to an endnote on page 123. The non-GAAP financial performance measures set out in this MD&A are intended to provide additional information to investors and do not have any standardized meaning under IFRS, and therefore may not be comparable to other issuers, and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS.




BARRICK YEAR-END 2020
2
MANAGEMENT’S DISCUSSION AND ANALYSIS


Index

Overview
Our Vision
Our Business
Our Strategy
Financial and Operating Highlights
Environmental, Social and Governance
Reserves and Resources
Key Business Developments
Outlook for 2021
Risks and Risk Management
Market Overview
Production and Cost Summary
Operating Divisions Performance
Nevada Gold Mines
Carlin
Cortez
Turquoise Ridge
Other Mines - Nevada Gold Mines
Pueblo Viejo
Loulo-Gounkoto
Kibali
Veladero
Porgera
North Mara
Bulyanhulu
Other Mines - Gold
Other Mines - Copper
Growth Project Updates
Exploration and Mineral Resource Management
Review of Financial Results
Revenue
Production Costs
Capital Expenditures
General and Administrative Expenses
Exploration, Evaluation and Project Costs
Finance Costs, Net
Additional Significant Statement of Income Items
Income Tax Expense
Financial Condition Review
Balance Sheet Review
Shareholders’ Equity
Financial Position and Liquidity
Summary of Cash Inflow (Outflow)
Summary of Financial Instruments
Commitments and Contingencies
Review of Quarterly Results
Internal Control over Financial Reporting and Disclosure Controls and Procedures
IFRS Critical Accounting Policies and Accounting Estimates
Non-GAAP Financial Performance Measures
Technical Information
Endnotes
Glossary of Technical Terms
Mineral Reserves and Mineral Resources Tables
121 Management’s Responsibility
122 Management’s Report on Internal Control Over Financial Reporting
123 Independent Auditor’s Report
127 Financial Statements
132 Notes to Consolidated Financial Statements

BARRICK YEAR-END 2020
3
MANAGEMENT’S DISCUSSION AND ANALYSIS


Overview

Our Vision
We strive to be the world’s most valued gold mining business by finding, developing and owning the best assets, with the best people, to deliver sustainable returns for our owners and partners.

Our Business
Barrick is one of the world’s leading gold mining companies with annual gold production and gold reserves that are among the largest in the industry. We are principally engaged in the production and sale of gold and copper, as well as related activities such as exploration and mine development. We hold ownership interests in fourteen producing gold mines, including six Tier One Gold Assets1 and a diversified asset portfolio positioned for growth in many of the world’s most prolific gold districts. These gold mines are geographically diversified and are located in Argentina, Canada, Côte d’Ivoire, the Democratic Republic of Congo, the Dominican Republic, Mali, Tanzania and the United States. Our mine in Papua New Guinea was placed on care and maintenance in April 2020. Our copper mines are located in Zambia, Chile and Saudi Arabia. We also have exploration and development projects located throughout the Americas and Africa. We sell our production in the world market through the following distribution channels: gold bullion is sold in the gold spot market or to independent refineries; gold and copper concentrate is sold to independent smelting or trading companies; and copper cathode is sold to third-party purchasers or on exchange. Barrick shares trade on the New York Stock Exchange under the symbol GOLD and the Toronto Stock Exchange under the symbol ABX.

2020 REVENUE ($ millions)

a2020revenue1a.jpg


Our Strategy
Our strategy is to operate as business owners by attracting and developing world-class people who understand and are involved in the value chain of the business, act with integrity and are tireless in their pursuit of excellence. We are focused on returns to our stakeholders by optimizing free cash flow, managing risk to create long-term value for our shareholders and partnering with host governments and our local communities to transform their country’s natural resources into sustainable benefits and mutual prosperity. We aim to achieve this through the following:1

Asset Quality
Grow and invest in a portfolio of Tier One Gold Assets, Tier Two Gold Assets and Strategic Assets2 with an emphasis on organic growth to leverage our existing footprint. We will focus our efforts on identifying, investing in and developing assets that meet our investment criteria. The required internal rate of return (IRR) for Tier One Gold Assets and Tier Two Gold Assets is 15% and 20%, respectively, based on our long-term gold price assumption. A Tier One Gold Asset is an asset with a reserve potential to deliver a minimum 10-year life, annual production of at least 500,000 ounces of gold and total cash costs per ounce4 over the mine life that are in the lower half of the industry cost curve. A Tier Two Gold Asset is an asset with a reserve potential to deliver a minimum 10-year life, annual production of at least 250,000 ounces of gold and total cash costs per ounce4 over the mine life that are in the lower half of the industry cost curve.
Invest in exploration across extensive land positions in many of the world’s most prolific gold districts.
Maximize the long-term value of our strategic Copper Business3.
Sell non-core assets over time in a disciplined manner.

Operational Excellence
Strive for zero harm workplaces.
Operate a flat management structure with a strong ownership culture.
Streamline management and operations, and hold management accountable for the businesses they manage.
Leverage innovation and technology to drive industry-leading efficiencies.
Build trust-based partnerships with host governments, business partners, and local communities to drive shared long-term value.

Sustainable Profitability
Follow a disciplined approach to growth and proactively manage our impacts on the wider environment, emphasizing long-term value for all stakeholders.
Increase returns to shareholders, driven by a focus on return on capital, internal rate of return and free cash flow.

1 Numerical annotations throughout the text of this document refer to the endnotes found on page 123.
BARRICK YEAR-END 2020
4
MANAGEMENT’S DISCUSSION AND ANALYSIS


Financial and Operating Highlights
For the three months ended For the years ended
   12/31/20 9/30/20 Change 12/31/20 12/31/19  Change 12/31/18
Financial Results ($ millions)
Revenues 3,279  3,540  (7)% 12,595  9,717  30% 7,243 
Cost of sales 1,814  1,927  (6)% 7,417  6,911  7% 5,220 
Net earnings (loss)a
685  882  (22)% 2,324  3,969  (41%) (1,545)
Adjusted net earningsb
616  726  (15)% 2,042  902  126% 409 
Adjusted EBITDAb
2,106  2,223  (5)% 7,492  4,833  55% 3,080 
Adjusted EBITDA marginb,c
64  % 63  % 2% 59  % 50  % 18% 43  %
Total minesite sustaining capital expendituresd
354  415  (15)% 1,559  1,320  18% 968 
Total project capital expendituresd
184  126  46% 471  370  27% 425 
Total consolidated capital expendituresd,e
546  548  0% 2,054  1,701  21% 1,400 
Net cash provided by operating activities 1,638  1,859  (12)% 5,417  2,833  91% 1,765 
Net cash provided by operating activities marginf
50  % 53  % (6)% 43  % 29  % 48% 24  %
Free cash flowb
1,092  1,311  (17)% 3,363  1,132  197% 365 
Net earnings (loss) per share (basic and diluted) 0.39  0.50  (22)% 1.31  2.26  (42%) (1.32)
Adjusted net earnings (basic)b per share
0.35  0.41  (15)% 1.15  0.51  125% 0.35 
Weighted average diluted common shares (millions of shares) 1,778  1,778  0% 1,778  1,758  1% 1,167 
Operating Results
Gold production (thousands of ounces)g
1,206  1,155  4% 4,760  5,465  (13%) 4,527 
Gold sold (thousands of ounces)g
1,186  1,249  (5)% 4,879  5,467  (11%) 4,544 
Market gold price ($/oz) 1,874  1,909  (2)% 1,770  1,393  27% 1,268 
Realized gold priceb,g ($/oz)
1,871  1,926  (3)% 1,778  1,396  27% 1,270 
Gold cost of sales (Barrick’s share)g,h ($/oz)
1,065  1,065  0% 1,056  1,005  5% 892 
Gold total cash costsb,g ($/oz)
692  696  (1)% 699  671  4% 588 
Gold all-in sustaining costsb,g ($/oz)
929  966  (4)% 967  894  8% 806 
Copper production (millions of pounds)i
119  103  16% 457  432  6% 383 
Copper sold (millions of pounds)i
108  116  (7)% 457  355  29% 382 
Market copper price ($/lb) 3.25  2.96  10% 2.80  2.72  3% 2.96 
Realized copper priceb,i ($/lb)
3.39  3.28  3% 2.92  2.77  5% 2.88 
Copper cost of sales (Barrick’s share)i,j ($/lb)
2.06  1.97  5% 2.02  2.14  (6%) 2.40 
Copper C1 cash costsb,i ($/lb)
1.61  1.45  11% 1.54  1.69  (9%) 1.97 
Copper all-in sustaining costsb,i ($/lb)
2.42  2.31  5% 2.23  2.52  (12%) 2.82 
   As at 12/31/20 As at 9/30/20 Change As at 12/31/20 As at 12/31/19 Change As at 12/31/18
Financial Position ($ millions)
Debt (current and long-term) 5,155  5,161  0% 5,155  5,536  (7)% 5,738 
Cash and equivalents 5,188  4,744  9% 5,188  3,314  57% 1,571 
Debt, net of cash (33) 417  (108)% (33) 2,222  (101)% 4,167 
a.Net earnings (loss) represents net earnings (loss) attributable to the equity holders of the Company.
b. Adjusted net earnings, adjusted EBITDA, adjusted EBITDA margin, free cash flow, adjusted net earnings per share, realized gold price, all-in sustaining costs, total cash costs, C1 cash costs and realized copper price are non-GAAP financial performance measures with no standardized meaning under IFRS and therefore may not be comparable to similar measures presented by other issuers. For further information and a detailed reconciliation of each non-GAAP measure to the most directly comparable IFRS measure, please see pages 96 to 122 of this MD&A.
c. Represents adjusted EBITDA divided by revenue.
d. Amounts presented on a consolidated cash basis. Project capital expenditures are included in our calculation of all-in costs, but not included in our calculation of all-in sustaining costs.
e.Total consolidated capital expenditures also includes capitalized interest.
f. Represents net cash provided by operating activities divided by revenue.
g. Includes North Mara, Bulyanhulu and Buzwagi on a 84% basis starting January 1, 2020 (and on a 63.9% basis from January 1, 2018 to September 30, 2019; notwithstanding the completion of the Acacia transaction on September 17, 2019, we consolidated our interest in Acacia and recorded a non-controlling interest of 36.1% in the income statement for the entirety of the third quarter of 2019 as a matter of convenience; and on a 100% basis from October 1, 2019 to December 31, 2019), Pueblo Viejo on a 60% basis, South Arturo on a 36.9% basis from July 1, 2019 onwards as a result of the contribution to Nevada Gold Mines (and on a 60% basis from January 1, 2018 to June 30, 2019), and Veladero on a 50% basis, which reflects our equity share of production and sales. Commencing on January 1, 2019, the effective date of the merger with Randgold Resources Limited (the “Merger”), also includes Loulo-Gounkoto on an 80% basis, Kibali on a 45% basis, Tongon on an 89.7% basis, and Morila on a 40% basis until the second quarter of 2019. Also removes the non-controlling interest of 38.5% Nevada Gold Mines from July 1, 2019 onwards.
h.Gold cost of sales (Barrick’s share) is calculated as cost of sales - gold on an attributable basis (excluding sites in care and maintenance) divided by ounces sold.
i.Amounts reflect production and sales from Jabal Sayid and Zaldívar on a 50% basis, which reflects our equity share of production, and Lumwana.
j.Copper cost of sales (Barrick’s share) is calculated as cost of sales (copper) plus our equity share of cost of sales attributable to Zaldívar and Jabal Sayid divided by pounds sold.
BARRICK YEAR-END 2020
5
MANAGEMENT’S DISCUSSION AND ANALYSIS


OPERATING CASH FLOW AND FREE CASH FLOWa
    DEBT, NET OF CASH ($ billions)

fcf11.jpg debt1.jpg

GOLD PRODUCTION (thousands of ounces)
COPPER PRODUCTION (millions of pounds)

goldproduction1.jpg copperproduction1.jpg

GOLD COST OF SALESb, TOTAL CASH COSTSa,
COPPER COST OF SALESb, C1 CASH COSTSa,
AND ALL-IN SUSTAINING COSTSa ($ per ounce)
AND ALL-IN SUSTAINING COSTSa ($ per pound)
goldaisc1.jpg coppercostofsales1a.jpg

a.These are non-GAAP financial performance measures with no standardized meaning under IFRS and therefore may not be comparable to similar measures presented by other issuers. For further information and a detailed reconciliation of each non-GAAP measure to the most directly comparable IFRS measure, please see pages 96 to 122 of this MD&A.
b.Cost of sales applicable to gold per ounce is calculated using cost of sales applicable to gold on an attributable basis (removing the non-controlling interest of 40% Pueblo Viejo, 16% North Mara, Bulyanhulu and Buzwagi starting January 1, 2020, the date the GoT’s 16% free carried interest was made effective (36.1% from January 1, 2018 to September 30, 2019; notwithstanding the completion of the Acacia transaction on September 17, 2019, we consolidated our interest in Acacia and recorded a non-controlling interest of 36.1% in the income statement for the entirety of the third quarter of 2019 as a matter of convenience); and 63.1% South Arturo from cost of sales from July 1, 2019 onwards as a result of its contribution to Nevada Gold Mines (and on a 40% basis from January 1, 2018 to June 30, 2019), divided by attributable gold ounces. Commencing January 1, 2019, the effective date of the Merger, the non-controlling interest of 20% Loulo-Gounkoto and 10.3% Tongon is also removed from cost of sales and our proportionate share of cost of sales attributable to equity method investments (Kibali, and Morila until the second quarter of 2019) is included. Cost of sales applicable to gold per ounce also removes the non-controlling interest of 38.5% Nevada Gold Mines from July 1, 2019 onwards. Cost of sales applicable to copper per pound is calculated using cost of sales applicable to copper including our proportionate share of cost of sales attributable to equity method investments (Zaldívar and Jabal Sayid), divided by consolidated copper pounds (including our proportionate share of copper pounds from our equity method investments).
c.Based on the midpoint of the guidance range.



BARRICK YEAR-END 2020
6
MANAGEMENT’S DISCUSSION AND ANALYSIS


Factors affecting net earnings and adjusted net earnings4 - three months ended December 31, 2020 versus September 30, 2020
Net earnings attributable to equity holders of Barrick ("net earnings") for the three months ended December 31, 2020 were $685 million compared to $882 million in the prior quarter. The decrease was primarily due to a lower realized gold price4 of $1,871 per ounce for the three months ended December 31, 2020, compared to $1,926 per ounce in the prior quarter.
After adjusting for items that are not indicative of future operating earnings, adjusted net earnings4 of $616 million for the three months ended December 31, 2020 were $110 million lower than the prior quarter. The decrease in adjusted net earnings4 was mainly due to a lower realized gold price4, as discussed above, and a decrease in gold and copper sales volumes.
The significant adjusting item in the three months ended December 31, 2020 was $118 million ($126 million before tax and non-controlling interest) in acquisition/disposition gains, primarily resulting from the sale of Eskay Creek, Morila and Bullfrog.
Refer to page 97 for a full list of reconciling items between net earnings and adjusted net earnings4 for the current and previous periods.

Factors affecting net earnings and adjusted net earnings4 - year ended December 31, 2020 versus December 31, 2019
Net earnings for the year ended December 31, 2020 were $2,324 million compared to $3,969 million in the prior year. The significant decrease was primarily due to items occurring in the prior year, including:
a gain of $1.9 billion ($1.5 billion net of taxes) relating to the remeasurement of Turquoise Ridge to fair value as a result of its contribution to Nevada Gold Mines;
a gain of $408 million (no tax impact) resulting from the sale of our 50% interest in Kalgoorlie;
an impairment reversal at Lumwana of $947 million ($663 million net of taxes) and at Pueblo Viejo of $865 million ($277 million net of taxes and non-controlling interest), partially offset by an impairment charge at Pascua-Lama of $296 million (no tax impact);
a gain of $628 million (no tax impact) on the de-recognition of the deferred revenue liability relating to our silver sale agreement with Wheaton Precious Metals Corp. (“Wheaton”); and
a gain of $216 million on a settlement of customs duty and indirect taxes at Lumwana.

The decrease was partially offset by current year positive items consisting of:
a net impairment reversal of $91 million ($304 million before tax) resulting from the framework agreement with the Government of Tanzania being signed and made effective in the first quarter of 2020;
a gain of $172 million ($180 million before tax and non-controlling interest) in acquisitions/dispositions, primarily resulting from the sales of Eskay Creek, Massawa, Morila and Bullfrog; and
a gain of $104 million (no tax impact) on the remeasurement of the residual cash liability relating to our silver sale agreement with Wheaton.

After adjusting for items that are not indicative of future operating earnings, adjusted net earnings4 of $2,042 million for the year ended December 31, 2020 were $1,140 million higher than the prior year. The increase in adjusted net
earnings4 was primarily due to a higher realized gold price4 of $1,778 per ounce in 2020 compared to $1,396 per ounce in the prior year, partially offset by higher gold cost of sales per ounce5.
Refer to page 97 for a full list of reconciling items between net earnings and adjusted net earnings4 for the current and previous periods.

Factors affecting Operating Cash Flow and Free Cash Flow4 - three months ended December 31, 2020 versus September 30, 2020
In the three months ended December 31, 2020, we generated $1,638 million in operating cash flow, compared to $1,859 million in the prior quarter. The decrease of $221 million was primarily due to an increase in interest paid as a result of the timing of interest payments on our public market debt. This was combined with a lower realized gold price4 of $1,871 per ounce for the three months ended December 31, 2020, compared to $1,926 per ounce in the prior quarter.
Free cash flow4 for the three months ended December 31, 2020 was $1,092 million, compared to $1,311 million in the prior quarter, reflecting lower operating cash flows, while capital expenditures remained consistent with the prior quarter. In the three months ended December 31, 2020, capital expenditures on a cash basis were $546 million compared to $548 million in the prior quarter as a decrease in minesite sustaining capital expenditures was offset by higher project capital expenditures. The decrease in minesite sustaining capital expenditures is primarily due to Loulo-Gounkoto and was driven by lower capitalized stripping at the Gounkoto open pit and a decrease in capital development at Loulo. This was combined with a decrease at Cortez as a result of fewer haul truck component replacements, the ramp-down of the Crossroads dewatering project until the next stages are reviewed and approved, and a reduction in capitalized stripping as the mine transitions out from a mostly stripping phase at Crossroads Phase 4. The increase in project capital expenditures was primarily due to the plant and tailings expansion project at Pueblo Viejo and the restart of underground mining and processing operations at Bulyanhulu.

Factors affecting Operating Cash Flow and Free Cash Flow4 - year ended December 31, 2020 versus December 31, 2019
For the year ended December 31, 2020, we generated $5,417 million in operating cash flow, compared to $2,833 million in the prior year. The increase of $2,584 million was primarily due to a higher realized gold price4 of $1,778 per ounce in 2020, compared to $1,396 per ounce in the prior year, partially offset by higher gold cost of sales per ounce5. The current year also included a full year contribution from Nevada Gold Mines, whereas the prior year included a contribution for only the six month period from July 1, 2019.
For 2020, we generated free cash flow4 of $3,363 million compared to $1,132 million in the prior year. The increase primarily reflects higher operating cash flows, partially offset by higher capital expenditures. In 2020, capital expenditures on a cash basis were $2,054 million compared to $1,701 million in the prior year, mainly as a result of the formation of Nevada Gold Mines. This was combined with higher minesite sustaining capital expenditures as a result of increased capitalized stripping at Loulo-Gounkoto and our investment in the tailings storage facility and other water management initiatives at North
BARRICK YEAR-END 2020
7
MANAGEMENT’S DISCUSSION AND ANALYSIS


Mara. This was further impacted by higher project capital expenditures related to the plant and tailings expansion project at Pueblo Viejo and the restart of underground mining and processing operations at Bulyanhulu.

Environmental, Social and Governance ("ESG")
Sustainability is integral to Barrick and is entrenched in our DNA. This means that the day-to-day ownership of sustainability-related risks and opportunities is in the hands of individual sites. As each site manages its geological, operational and technical capabilities to meet our business objectives, the site must also manage its own sustainability performance.
Our commitment and responsibility for sustainability is driven at an operational level, not set in a corporate office as part of a compliance exercise. Each site plays a role in identifying programs, metrics, and targets that measure real progress and deliver real impacts for the business and our stakeholders, including our host countries and local communities. The Group Sustainability Executive, as a member of the Group’s Executive Committee, provides oversight and direction on this site-level ownership, ensuring alignment towards the strategic priorities of the overall business.
Our sustainability strategy is built on four main pillars: (1) Ensuring we respect human rights; (2) Protecting the health and safety of our people and local communities; (3) Sharing the benefits of our operations; and 4) Managing our impacts on the environment.
We are encouraged that analyzing ESG strategy as part of an investment thesis has moved from the margins to the mainstream. However, we also recognize the challenges it presents with the ever-increasing number of disclosures, tools and metrics used to score a company’s performance.
Our 2019 Sustainability Report introduced an ESG scorecard to address this challenge. The scorecard, which is a first for our industry, sets out what we believe are the sustainability issues most relevant both for our business and our industry, ranking us against our peers and internal metrics. It compares our performance across our priority ESG areas: Health and Safety, Social and Economic Development, Human Rights, the Environment, as well as Governance. Our performance on these aspects is then aggregated into an overall score.
For 2020, our performance on the scorecard will account for 25% of the long-term incentive for our executives. For 2019, we scored a B grade (on a scale where A represents high performance and E represents poor performance). We believe this accurately reflected the improvements in our sustainability performance during 2019, but also acknowledge that areas remain where we need to improve.
The scorecard will be updated and published in our 2020 Sustainability Report, which is expected to be released early in the second quarter of 2021, and will reflect the improvement in performance we have realized year-on-year.

Safety
Our safety vision is “Every person going home safe and healthy every day.”
Barrick is committed to the safety, health and well-being of our people, their families and the communities in which we operate. Our safety performance is reported as
part of our quarterly Environmental & Social Oversight Committee ("E&S Committee") meetings and to the Board's Corporate Governance & Nominating Committee.
Our goal is for the safety management systems at all operational mines to be certified to the internationally recognized ISO 45001 standard by the end of 2021, with three sites already accredited.
Across the Company, we have implemented our “Journey to Zero Harm” initiative. This initiative is focused on:
Engagement with our workforce through Visible Felt Leadership;
Aligning and improving our standards;
Ensuring accountability to our safety commitments; and
Ensuring our employees are fit for duty.

Our relentless focus on safety has helped drive performance improvements across much of the Group in 2020.
Our Group Lost Time Injury Frequency Rate ("LTIFR")6 decreased to 0.32 in the fourth quarter of 2020, down from 0.45 in the prior quarter. Our Total Reportable Injury Frequency Rate (“TRIFR”)6 for the fourth quarter of 2020 was 1.43, a decrease from the prior quarter of 2.07.
For 2020, the Group recorded fewer Lost Time Injuries ("LTIs") and Total Recordable Injuries (“TRIs”) compared to last year, with the related frequency rates also decreasing year-on-year.
Although we saw a year-on-year improvement in terms of our safety record with fewer total recordable injuries, we unfortunately suffered a fatality at Kibali in the Democratic Republic of Congo in November 2020. Aurelien Mufungizi, an underground service truck operator, was fatally injured underground when he became trapped between two heavy vehicles. A thorough investigation into the incident was completed, with lessons learned and corrective actions communicated to every site within the Group to ensure that similar tragedies never happen again. Our deepest condolences go out to his family.

Environment
Strong environmental management is a crucial building block of our business. Environmental issues with the greatest potential impact on the health and safety of local communities, such as how we use water, prevent incidents and manage tailings, are our highest priority.
Immediately after the Merger, we set a corporate goal for all sites to have their Environmental Management System (“EMS”) certified to the ISO 14001:2015 standard by the end of 2020. At the start of 2020, only four mines (Jabal Sayid, Bulyanhulu, Buzwagi and North Mara) remained to be certified. In October, Jabal Sayid was recommended for its inaugural certification to the ISO 14001:2015 standard. Following this, Bulyanhulu and Buzwagi were certified in November and December, respectively. North Mara is scheduled to complete a certification audit by the end of the first quarter of 2021.
We maintained our strong track record of stewardship and did not record any Class 17 environmental incidents during 2020.


BARRICK YEAR-END 2020
8
MANAGEMENT’S DISCUSSION AND ANALYSIS


Climate
In early 2020, we reviewed and updated our climate change strategy.
Barrick’s climate change strategy has three pillars: (1) Identify, understand and mitigate the risks associated with climate change; (2) Measure and reduce our impacts on climate change; and (3) Improve our disclosure on climate change. Action taken on each pillar is described below.

Identify, understand and mitigate the risks associated with climate change
We continue to take steps to identify and manage risks and build resilience to climate change, as well as to position ourselves for new opportunities. Climate change-related factors continue to be incorporated into Barrick’s formal risk assessment process (for example, consideration is given to the availability and access to water, together with the impact of increased precipitation, drought, or severe storms on operations as well as on local communities). We have identified several climate-related risks and opportunities for our business including: physical impacts of climate change, such as an increase in extended duration extreme precipitation events; an increase in regulations that seek to address climate change; and an increase in global investment in innovation and low-carbon technologies.

Measure and reduce the Group’s impact on climate change
Mining is an energy-intensive business, and we understand the important link between energy use and greenhouse gas (“GHG”) emissions. By measuring and effectively managing our energy use, we can reduce our draw from local energy grids, reduce our GHG emissions, achieve more efficient production, and reduce our costs.

Improve our disclosure on climate change
As part of our commitment to improve our disclosure on climate change, we complete the annual CDP (formerly known as the Carbon Disclosure Project) emissions questionnaire, which makes investor-relevant climate data widely available. In 2020, Barrick received a C minus grade on the CDP Climate Change Questionnaire. This grade places Barrick in the 'awareness' scoring band.
The Board’s Corporate Governance & Nominating Committee meets quarterly and is responsible for overseeing Barrick’s policies, programs and performance relating to the environment, including climate change. The Audit & Risk Committee assists the Board in overseeing the Group’s management of enterprise risks as well as the implementation of policies and standards for monitoring and mitigating such risks. Climate change is built into our formal risk management process, outputs of which were reviewed by the Audit & Risk Committee throughout 2019 and 2020.
During 2020, we also concluded an update of our global scenario analysis, and we are now advancing an individual site-by-site analysis to better understand the risk that climate change poses to each operation, with an initial focus on our Tier One Gold Assets1. In addition, the Audit & Risk Committee reviewed the Group’s approach to climate change in the context of our public disclosures.
As detailed in our 2019 Sustainability Report, Barrick has updated its GHG emissions reduction target to achieve a reduction of at least 10% by 2030, while maintaining a steady ounce production profile. The basis of this reduction is against a 2018 baseline that combines
legacy Barrick and Randgold data as well as 2018 emissions from the assets over which we assumed operational control in 2019, including Nevada Gold Mines and the Tanzanian mines.
Our emissions reduction target is grounded in climate science and has a detailed and demonstrable pathway for achievement. This required the identification of several projects for implementation, including certain projects that are already contributing to emissions reduction:
Our investment in battery technology at Kibali will further reduce the mine’s requirement for diesel generators.
At Loulo-Gounkoto, we have installed a 20 MW solar power plant, which began injecting power into the microgrid.
In the Dominican Republic, we have switched the Quisqueya Power Plant from heavy fuel oil to cleaner burning natural gas.

Our target is not static and will be updated as we continue to identify and implement new GHG reduction opportunities.
We expect our focus on climate change to continue through 2021 and beyond, with several projects that will further reduce GHG emissions. Those listed below are more advanced in the project lifecycle with capital already committed.
Nevada Gold Mines – Conversion of the TS power plant from coal to natural gas. This is estimated to reduce GHG emissions by 563 kt CO2-e per annum.
Nevada Gold Mines – Construction of a 100 MW TS Solar Farm. This is estimated to reduce GHG emissions by 52 kt CO2-e per annum.
Pueblo Viejo – Implementing the Lime Kiln Fuel Switch Project (from diesel to liquified natural gas) which is estimated to reduce GHG emissions by 127 kt CO2-e per annum.
Loulo-Gounkoto – Doubling the capacity of the 20 MW Loulo Solar Power Plant for an incremental 27 kt CO2-e per annum reduction, which is at the feasibility stage.

In our upcoming 2020 Sustainability Report, to be released early in the second quarter of 2021, we plan to provide details on an increase in our emissions reduction target to at least 30% by 2030 against the 2018 baseline of 7,541 kT CO2e per annum, while maintaining a steady production profile. We also expect to provide details on a new interim reduction target of 15%, which is based on feasibility projects that have been identified and are currently being implemented. Ultimately, our vision is net zero GHG emissions achieved primarily through GHG reductions, with some offsets for hard-to-abate emissions. Site-level plans to reduce energy and GHG emissions will also be strengthened, and we plan to supplement our corporate emissions reduction target with context-based site-specific emissions reduction targets.
We continue to align our disclosures with the Taskforce on Climate-related Financial Disclosures ("TCFD") and will work to incorporate scenario analysis into our future disclosures. We have a strong foundation and Barrick continues to build further resilience to withstand the potential impacts of climate change and leverage potential opportunities as the global economy transitions to a low-carbon future.

BARRICK YEAR-END 2020
9
MANAGEMENT’S DISCUSSION AND ANALYSIS


Water
Our aim is to deliver enough water for the effective operation of our mines, while at the same time protecting the quality and quantity of water available to host communities and other users in our watersheds. Our commitment to responsible water use is codified in our Environmental Policy. This requires us to minimize our use of water, control and manage our impacts on water quality, and engage with stakeholders, including local communities, to maintain sustainable management of water resources for the benefit of all users.
Each mine has its own site-specific water management plan, which considers: (1) the different water sources available; (2) the local climate conditions; and (3) the needs of local users and the needs of the mine. This information is supplemented by a range of international frameworks and tools such as the WWF Water Risk Filter to evaluate water risks, particularly those linked to water stress.
We include each mine’s water risks in its operational risk register. These risks are then aggregated and incorporated into the corporate risk register. Our identified water-related risks include: (1) managing excess water in regions with high rainfall; (2) maintaining access to water in arid areas and regions prone to water scarcity; and (3) regulatory risks related to permitting limits as well as municipal and national regulations for water use.
Our water recycling and reuse rate for 2020 is above our annual target of 75%. We will provide an update on our progress against this target in our 2020 Sustainability Report.

Tailings
We are committed to ensuring our tailings storage facilities ("TSFs") meet global best practices for safety. Our TSFs are carefully engineered and regularly inspected, particularly those in regions with high rainfall and seismic activities.
Barrick currently manages 63 TSFs, of which 21 (33%) are operating, 41 (65%) are closed, and one is inactive. A riverine tailings disposal system was used at the Porgera Joint Venture in Papua New Guinea prior to entering care and maintenance on April 25, 2020. In 2020, independent reviews were conducted at our Pueblo Viejo, Phoenix, Carlin, Cortez, Hemlo, and Loulo-Gounkoto mines, as well as the Giant Nickel and Nickel Plate closure sites.

Social
We regard our host communities and countries as important partners in our business. We understand we are guests and want the countries and communities we operate in to benefit from our presence. We are committed to contributing to their social and economic development. Our sustainability policies also commit us to transparency in our relationships with host communities, government authorities, the public and other key stakeholders. These policies also commit us to conducting our business with integrity through our absolute opposition to corruption, and requiring our suppliers to operate ethically and responsibly as a condition of doing business with us.
Our approach to our relationships with our Indigenous Partners is no different, and we create genuine partnerships that aim to build a long-term positive legacy within our host communities.
Community and economic development
Our commitment to social and economic development is set out in our overarching Sustainable Development Policy and our Social Performance Policy.
Paying our fair share of taxes - The taxes, royalties and dividends we pay provide significant income for our host countries as well as help to fund vital services and infrastructure. We have introduced a comprehensive tax policy covering governance, management of tax risks, principles of tax planning, compliance and relationship with tax authorities as well as transparency and disclosure. Furthermore, we report all government and tax payments transparently, primarily through the reporting mechanism of the Canadian Extractive Sector Transparency Measures Act (“ESTMA”).
Prioritizing local hiring - The employment opportunities created by our presence is one of our largest social and economic contributions to our host communities and countries. Our aim is to maximize this contribution. We work to identify and nurture local talent at every level of our business through a range of skills and formal training. We augment this by prioritizing the purchase of goods and services from local communities and host countries. At the end of 2020, 97% of our workforce and 80% of senior management were nationals from our host countries.
Prioritizing local buying - We want to maximize the amount of value that stays in our countries of operation. That is why our procurement processes prioritize local companies, followed by those from the larger region or host country. Over the course of 2020, we procured over $4.4 billion of goods and services from suppliers based in our host countries on a 100% basis.
Investing in community-led development initiatives - We believe that no one knows the needs of local communities better than the communities themselves. That is why we have been targeting the establishment of community development committees (“CDCs”) at every operating site - a target that we achieved in 2020. The role of the CDC is to allocate the community investment budget to those projects and initiatives most needed and desired by local stakeholders. Each CDC is elected and made up of a mix of local leaders, community members as well as representatives from local women and youth groups. In the fourth quarter of 2020, we invested over $13 million in sustainable community development projects, over and above any Covid-19 initiatives.

Human rights
Respect for human rights is a central part of our sustainability vision. We have zero tolerance for human rights violations wherever we operate. We avoid causing or contributing to human rights violations and we facilitate access to remedies. Our commitment to respect human rights is codified in our standalone Human Rights Policy and informed by the expectations of the UN Guiding Principles on Business and Human Rights, the Voluntary Principles on Security and Human Rights, and the OECD Guidelines for Multinational Enterprises.
Our commitments to respect human rights is fulfilled on the ground via our Human Rights Program, the fundamental principles of which include:
Monitoring and reporting;
Due diligence;
BARRICK YEAR-END 2020
10
MANAGEMENT’S DISCUSSION AND ANALYSIS


Training; and
Disciplinary action and remedy.

We also expect the same standards from our suppliers as our Supplier Code of Ethics incorporates human rights provisions.
Responsibility for the oversight and implementation of our human rights compliance program sits with our Group Sustainability Executive, with support from our Senior Vice President Business Assurance and Risk, and our Human Resources Executive.
During the fourth quarter of 2020, we reviewed and revised several policies and programs related to human rights, most notably our Policy on the Voluntary Principles for Security and Human Rights and have updated our training program to be more interactive.

Governance
The bedrock of our sustainability strategy is strong governance. Immediately after the Merger, Barrick established the E&S Committee to connect site-level ownership of our sustainability strategy with the leadership of the Group. It is chaired by the President and Chief Executive Officer and includes: (1) regional Chief Operating Officers; (2) Mine General Managers; (3) Health, Safety, Environment and Closure Leads; (4) the Group Sustainability Executive; and (5) an independent sustainability consultant in an advisory role. The E&S Committee meets to review our performance across a range of key performance indicators, and to provide independent oversight and review of sustainability management at each of our Tier One Gold Assets1.
The President and Chief Executive Officer reviews the reports of the E&S Committee with the Board's Corporate Governance & Nominating Committee on a quarterly basis to oversee the policies and performance of Barrick’s environmental, health and safety, corporate social responsibility, and human rights programs.
Further to the specific focus of the E&S Committee, weekly Executive Committee review meetings allow for the discussion of opportunities and risks that may help or hinder the Group from achieving its objectives, including climate-related risks.

Reserves and Resources8
For full details of our mineral reserves and mineral resources, refer to page 136 of the Q4 2020 Report.

Gold
Barrick’s 2020 reserves are estimated using a gold price assumption of $1,200 per ounce and are reported to a rounding standard of two significant digits, both unchanged from 2019. As of December 31, 2020, Barrick’s proven and probable gold reserves were 68 million ounces8 at an average grade of 1.66 g/t, compared to 71 million ounces9 at an average grade of 1.68 g/t in 2019. This year-over-year change reflects the removal of 2.2 million ounces at 3.94 g/t Au from reserves, due to the disposition of our interest in Massawa in 2020. When excluding the impact of Massawa, reserve replacement was 76% of depletion, with a consistent reserve grade maintained. Similarly, when adjusting for the disposition of Massawa, the net reduction in reserves year-over-year is approximately 2%.
Reserve replenishment, net of depletion, was achieved at three of Barrick’s Tier One Gold Assets1
Kibali, Loulo-Gounkoto and Pueblo Viejo. Both Hemlo and North Mara also achieved this milestone, advancing Hemlo down the path to becoming a Tier Two Gold Asset2, and moving the Bulyanhulu and North Mara mines closer to potential Tier One status as a combined complex. Strong conversion of mineral resources was delivered, despite the 2020 focus of exploration programs at NGM on geological model updates to drive longer-term resource growth, as well as the impact of the Covid-19 pandemic on drilling activities at Veladero.
During 2020, the Company converted 4.6 million attributable ounces of mineral resources to proven and probable reserves, before depletion.
The Africa & Middle East (“AME”) region converted 2.2 million ounces to attributable reserves, with contributions from Loulo-Gounkoto, Kibali, North Mara and Tongon. At Loulo-Gounkoto, this was principally from extensions at the Yalea, Gara and Gounkoto underground mines. At Kibali, the KCD underground extensions of the 3000 and 5000 lodes, as well as the new Megi-Marakeke-Sayi open-pit and growth from the existing Sessenge and Pamao open-pits, contributed to this increase. Given the year-over-year growth from the open-pits, the average grade of reserves at Kibali has decreased from 4.20 g/t Au to 3.84 g/t Au. However, this growth has extended the open-pit mine life at Kibali beyond 10 years, which improves mining flexibility and provides a more balanced and sustainable blend of open-pit and underground ore over the entire mine life. We aim to achieve a similar optimized and balanced life of mine profile at North Mara, with conversions in 2020 driven by extensions to the Gokona underground mine and the inclusion of the Gena open-pit pushback. At Tongon, conversion to mineral reserves was from the Djinni satellite pit as well as the pushback extensions to the Southern and Northern Zone pits.
The North America region converted 1.1 million ounces to attributable reserves, primarily from Carlin, Cortez and Hemlo, before depletion. At Hemlo, the increase in reserves, net of depletion, was driven by conversion drilling at the C Zone and B Zone, which represents the main source of fresh ore feed for the mill. The focus at Nevada Gold Mines continues to be on geological model updates, which we expect to drive mineral resource growth and potentially, mineral reserves. This strategy has paid dividends in AME, where a strong focus on geological understanding and resource growth has allowed for continued and sustainable conversion of mineral resources to mineral reserves.
The Latin America & Asia Pacific region converted 1.3 million ounces to attributable reserves, including 1.1 million ounces from Pueblo Viejo. This reflects only a small portion of a larger indicated resource base that could be potentially converted to mineral reserves following completion of the feasibility study on tailings expansion. For further information on the Pueblo Viejo Process Plant and Tailings Expansion Project, please refer to the Growth Projects Updates section of this MD&A.
The company-wide conversion of 4.6 million attributable ounces of mineral resources to reserves in 2020 was marginally offset by a decrease following a review and redesign of mining and modelling parameters at Turquoise Ridge and Bulyanhulu. This equates to a net conversion of 4.1 million ounces in 2020, compared to mining depletion of 5.4 million ounces of attributable reserves.
BARRICK YEAR-END 2020
11
MANAGEMENT’S DISCUSSION AND ANALYSIS


ATTRIBUTABLE CONTAINED GOLD RESERVES9,10,a (Moz)
reservesgold1a.jpg
a Figures rounded to two significant digits.

Gold Resources
In 2020, all mineral resources were estimated using a gold price assumption of $1,500 per ounce, unchanged from 2019. Barrick’s mineral resources for 2020 continue to be reported on an inclusive basis, incorporating all areas that form mineral reserves, reported at a resource cut-off grade and the assumed commodity price. All open-pit mineral resources are contained within a Whittle shell, while all underground mineral resources are contained within optimized mining shapes. Excluding the impact of Massawa, Barrick’s total attributable mineral resources grew in 2020, net of depletion. This growth in total mineral resources is a direct reflection of the Company’s increasing confidence in our geological models, which underpin all our operating business plans. In particular, this includes both the open-pit and underground mines of the Gokona deposit of North Mara, the Deep West zone of Bulyanhulu and across our portfolio at Nevada Gold Mines. This momentum will be the driver of future improvements in depletion replacement and mineral reserve conversion in the business.
Growth in total attributable mineral resources for North America, net of depletion, is encouraging. At Carlin, optimized pit shells at both Gold Quarry and South Arturo delivered year-over-year total open-pit resource growth at consistent grades. Notably at Gold Quarry, the geological model was further optimized based on process routing options only made possible with the formation of Nevada Gold Mines as the majority of ore is expected to be fed to the Goldstrike roaster. Within Leeville at Carlin, drilling at Rita K Lower Zone also delivered total mineral resource growth, net of depletion, with further exploration upside to the northwest. At Cortez, total mineral resource growth was principally driven by the Robertson open-pit and to a lesser extent, updated geological modelling at the Cortez Pits and Goldrush. A portion of inferred resources were upgraded to the indicated category at Robertson, and together with year-over-year total mineral resource growth, supports our plan for the deposit to contribute meaningfully to Cortez’s production profile starting in 2025. At the Fourmile project, north of Goldrush, 0.47 million ounces was upgraded into the indicated resource category at 10.22 g/t Au, while inferred resources grew to 2.3 million ounces at a slightly higher year-over-year grade of 10.9 g/t Au. For further information on Goldrush and Fourmile, please refer to the Growth Projects Updates section of this MD&A.
Challenging operating environments throughout Latin America due to the Covid-19 pandemic impacted
drilling activities in 2020. However, we continued our focus on geological and metallurgical studies to grow our understanding of Veladero, Pascua-Lama and Del Carmen-Alturas through the year.
Barrick’s resources are reported to a rounding standard of two significant digits, unchanged from 2019. As of December 31, 2020, Barrick’s attributable measured and indicated resources were 160 million ounces8 at an average grade of 1.52 g/t Au. This compares to measured and indicated resources of 170 million ounces9 at an average grade of 1.55 g/t Au in 2019. Excluding the impact of Massawa, the year-over-year net change in raw attributable measured and indicated resources is a decrease of 1.5 million ounces, with grades remaining consistent. As of December 31, 2020, Barrick’s attributable inferred resources were 43 million ounces8 at an average grade of 1.4 g/t Au. This compares to inferred resources in 2019 of 39 million ounces9 at an average grade of 1.3 g/t Au. When adjusting for the disposition of Massawa, raw attributable inferred resources increased by 3.9 million ounces or 10% year-over-year, with grades improving by approximately 5.5% from 2019.

Copper
Copper mineral reserves for 2020 are estimated using a copper price of $2.75 per pound and mineral resources are estimated at $3.50 per pound, both unchanged from 2019. Copper reserves and resources for 2020 are reported to a rounding standard of two significant digits, also unchanged from 2019.
As of December 31, 2020, attributable proven and probable copper mineral reserves were 13 billion pounds8 at an average grade of 0.39%. This compares to 13 billion pounds9 at an average grade of 0.38% in the prior year.
Attributable measured and indicated copper mineral resources were 25 billion pounds8 at an average grade of 0.36%, and inferred copper mineral resources were 2.2 billion pounds8 at an average grade of 0.2% as of December 31, 2020. This compares to prior year attributable measured and indicated copper mineral resources of 26 billion pounds9 at an average grade of 0.38%, and inferred copper mineral resources of 2.2 billion pounds9 at an average grade of 0.2%.
2020 mineral reserves and mineral resources are estimated using the combined value of gold, copper and silver. Accordingly, mineral reserves and mineral resources are reported for all assets where copper or silver is produced and sold as a primary product or a by-product.

ATTRIBUTABLE CONTAINED COPPER RESERVES9,10,a (Blb)
reservescopper1a.jpg
a Figures rounded to two significant digits.
BARRICK YEAR-END 2020
12
MANAGEMENT’S DISCUSSION AND ANALYSIS


Key Business Developments
2020 Highlights
Captured the benefit of higher gold prices through disciplined operational execution, driving strong operating cash flow and record free cash flow4;
Decentralized and agile management structure ensured that we delivered on our 2020 gold and copper production guidance despite the challenges of Covid-19;
Strengthened balance sheet, increasing cash by 57% since the prior year and reaching zero debt, net of cash, from a peak of $13.4 billion in 2013;
Non-core asset divestiture strategy has delivered in excess of $1.5 billion since it commenced in 2019;
Increased shareholder returns, having tripled the quarterly dividend per share since the announcement of the merger with Randgold and proposed a return of capital of $750 million to shareholders over the course of 2021;
Introduced a 10-year production outlook, highlighting a stable asset base and ability to generate strong cash flow well into the future;
Integrated Exploration and Mineral Resource Management (“MRM”) team continued to delineate significant brownfields expansion potential within and outside our 10-year production outlook, including high-grade resource growth at Fourmile;
Introduced an industry-leading sustainability scorecard, designed to ensure transparent ESG reporting that aligns key performance indicators against strategic priorities; and
Strong track record of stewardship maintained with zero Class 1 environmental incidents7, and a significant year-over-year improvement in safety with LTIFR6 and TRIFR6 decreasing by 38% and 29%, respectively.

Covid-19 pandemic
Barrick continues to work closely with our local communities on managing the impacts of the Covid-19 pandemic on our people and our business. Barrick has a strong culture of caring for the welfare of its employees and the communities.  Our well-established prevention practices and procedures, and the experience we gained from dealing with two Ebola outbreaks around our African operations, has assisted us as we face this new and unprecedented challenge.  We have been actively working to support government responses to the Covid-19 pandemic, both financially and using our supply chain to secure key supplies for the benefit of the communities in which we operate. 
Our preference for employing nationals in the countries where we operate, rather than expatriates, means that we are not dependent upon a workforce traveling to a site on a regular basis from other parts of the globe. We have adopted certain operating procedures to respond to Covid-19, and to date, our operations have not been significantly impacted by the pandemic with the exception of Veladero, where the government of Argentina implemented a mandatory nationwide quarantine in March 2020. Although this was lifted in April, movement and social distancing restrictions impacted the remobilization of employees and contractors back to Veladero.  
Early and considered actions by management, including social distancing, screening and contact tracing measures have been implemented at all our sites. This has allowed our sites to continue to produce and sell their production, while keeping our people and local communities safe at the same time. These actions have minimized the
impacts of the pandemic at our operations and facilitated the delivery of strong operating cash flow in 2020. 
Our focus on strengthening our balance sheet in recent years has given us the financial strength to endure any short-term impacts to our operations while supporting our strategy of participating in our industry’s inevitable consolidation.  We have $5.2 billion in cash, an undrawn $3.0 billion credit facility and no significant debt repayments due until 2033, providing us with sufficient liquidity to execute on our strategic goals. 
We also recognize the situation remains dynamic; we continue to monitor developments around the world and believe we have positioned Barrick as best we can to weather the storm and take advantage of any value opportunities should they present themselves.

Return of Capital
We have announced a proposal for a return of capital distribution for shareholder approval at the Annual and Special Meeting on May 4, 2021. This distribution is derived from a portion of the proceeds from the divestiture of Kalgoorlie Consolidated Gold Mines in November 2019 and from other recent dispositions made by Barrick and its affiliates. It is proposed that the total distribution of approximately $750 million will be effected in three equal tranches to shareholders of record on dates to be determined in May, August and November 2021.
The proposed return of capital distribution demonstrates Barrick’s commitment to return surplus funds to shareholders as outlined in the strategy announced at the time of the Merger in September 2018. Since that time, the quarterly dividend has tripled, and this capital distribution further increases returns to shareholders.
The Board continues to review further returns to shareholders, which will be balanced and evaluated equally across other capital uses, including disciplined growth and debt management.

Sale of Lagunas Norte
On February 16, 2021, Barrick announced it had entered into an agreement to sell its 100% interest in the Lagunas Norte gold mine in Peru to Boroo Pte Ltd for total consideration of up to $81 million, with $20 million of upfront cash consideration on closing. Completion of the sale is subject to closing conditions.

Porgera Special Mining Lease Extension
Porgera's Special Mining Lease (“SML”) terminated on August 16, 2019. The Company applied for a 20-year extension of the SML in June 2017 and has been engaging with the Government of Papua New Guinea on this matter since then. On August 2, 2019, the National Court of Papua New Guinea ruled that the provisions of the country’s 1992 Mining Act applied to the Porgera gold mine, thus allowing it to continue operating while the application to extend its SML was being considered. Also in 2019, in response to a request from Papua New Guinea Prime Minister Marape, the Company proposed a benefit-sharing arrangement that would deliver more than half the economic benefits from the Porgera mine to Papua New Guinea stakeholders, including the Government, for the remainder of the life of mine, estimated at 20 years.
On April 24, 2020, Barrick Niugini Limited (“BNL”), the majority owner and operator of the Porgera joint venture, received a communication from the Government of Papua New Guinea that the SML would not be extended.
BARRICK YEAR-END 2020
13
MANAGEMENT’S DISCUSSION AND ANALYSIS


The Company believes the Government’s decision not to extend the SML is tantamount to nationalization without due process and in violation of the Government’s legal obligations to BNL. The Company has been engaged in ongoing discussions with Prime Minister Marape and his Government in light of the potentially catastrophic impact of this decision for the communities at Porgera and in Enga Province, and for the country as a whole. On October 15, 2020, BNL and Prime Minister Marape issued a joint press release indicating that they had productive discussions toward mutually acceptable arrangements for a new Porgera partnership to reopen and operate the mine going forward. It further indicated that the parties had agreed in principle that Papua New Guinea will take a major share of equity under the new arrangements and BNL will retain operatorship and there will be a fair sharing of the economic benefits. Efforts to reach a memorandum of agreement to make these concepts and additional points binding are underway. In the meantime, all legal proceedings continue as discussed below.
BNL has been pursuing and will pursue all legal avenues to challenge the Government’s decision and to recover any damages that BNL may suffer as a result of the Government’s decision. Based on the communication received from the Government of Papua New Guinea that the SML would not be extended, Porgera was placed on temporary care and maintenance on April 25, 2020 to ensure the safety and security of our employees and communities. BNL remains in possession of the mine to conduct care and maintenance.
On April 28, 2020, BNL filed a Judicial Review action against the Government of Papua New Guinea in the Papua New Guinea National Court of Justice. Judicial Review is a proceeding that challenges the procedural and constitutional adequacy of government administrative actions. The Judicial Review action seeks to quash the decision not to extend the SML on the grounds that the Government did not comply with the applicable legal standards and processes.
Trial was set to commence in the Judicial Review action on August 12, 2020. BNL sought leave to appeal two procedural rulings of the National Court that would affect the trial to the Supreme Court of Papua New Guinea. The Government of Papua New Guinea then asked the National Court to dismiss the Judicial Review action on purely procedural grounds. On September 1, 2020, the Court granted the Government’s request and dismissed the Judicial Review action. BNL appealed that decision to the Supreme Court on September 7, 2020.
On October 1 and 6, 2020, the Supreme Court reversed the National Court's decision and granted BNL’s appeals of the two procedural rulings. The Supreme Court has not yet heard BNL’s appeal of the National Court’s dismissal of the Judicial Review action.
On August 25, 2020, the Government of Papua New Guinea purported to grant a new special mining lease covering the Porgera Mine to Kumul Mineral Holdings Limited (“Kumul”), the state-owned mining company. BNL immediately took administrative steps seeking to force the Government of Papua New Guinea to delay or withdraw the issuance of the special mining lease to Kumul. These administrative steps were not successful and on September 24, 2020, BNL commenced another Judicial Review action seeking to quash the decision to issue the special mining lease to Kumul. On January 26, 2021, the National Court granted BNL leave for the Judicial Review. In its decision, the Court declared itself satisfied that there was an arguable case that warrants the grant of the leave.
On July 9, 2020, BNL initiated conciliation proceedings before the World Bank’s International Centre for Settlement of Investment Disputes (“ICSID”). Through this conciliation, BNL seeks to reach an agreement for the extension of the SML on terms that will be mutually beneficial to the Company and to all Papua New Guinea stakeholders.
Simultaneously with BNL initiating the conciliation proceedings, Barrick (PD) Australia Pty Limited (“Barrick PD”), the Company’s subsidiary and an investor in the Porgera mine, has given notice to the Government of Papua New Guinea that a dispute has arisen under the Bilateral Investment Treaty (“BIT”) between Papua New Guinea and Australia, and has referred the dispute to arbitration before the ICSID. Barrick PD seeks to recover damages it has already suffered and damages it may suffer in the future by virtue of the Government’s wrongful refusal to grant an extension of the SML. The dispute notice expressly invites the Government to engage in consultations and negotiations in an attempt to resolve the investment treaty dispute.
Our priority remains the health and safety of all our employees and community stakeholders. Due to the uncertainty related to the timing and scope of future developments on the mine’s operating outlook, we have not included Porgera in our full year 2021 guidance. As this is an evolving situation, we will reassess on an ongoing basis and provide further updates in due course. Refer to notes 21 and 36 of the 2020 Annual Financial Statements for more information.

Silver sale agreement
Our silver sale agreement with Wheaton requires us to deliver 25% of the life of mine silver production from the Pascua-Lama project once it is constructed and required delivery of 100% of our silver production from the Lagunas Norte, Pierina and Veladero mines until March 31, 2018. The completion date guarantee under the silver sale agreement for Pascua-Lama was originally December 31, 2015 but was subsequently extended to June 30, 2020. Per the terms of the amended silver sale agreement, if the requirements of the completion guarantee were not satisfied by June 30, 2020, then Wheaton had the right to terminate the agreement within 90 days of that date, in which case, they would have been entitled to the return of the upfront consideration paid less credit for silver delivered up to the date of that event.
Given that, as of September 28, 2020, Wheaton had not exercised its termination right, a residual liability of $253 million remains due on September 1, 2039 (assuming no future deliveries are made). This residual cash liability was remeasured to $148 million as at September 30, 2020, being the present value of the liability due in 2039 discounted at a rate estimated for comparable liabilities, including Barrick's outstanding debt. This remeasurement resulted in a gain of $104 million recorded in Other Income in the third quarter of 2020. The liability of $148 million was reclassified from other current liabilities to other non-current liabilities in the third quarter of 2020 and will be measured at amortized cost in future periods. For further details of the silver sale agreement, refer to notes 3 and 29 of the 2020 Annual Financial Statements.


BARRICK YEAR-END 2020
14
MANAGEMENT’S DISCUSSION AND ANALYSIS


Sale of Eskay Creek
On August 4, 2020 Barrick entered into a definitive agreement with Skeena Resources Limited (“Skeena”) pursuant to which Skeena exercised its option to acquire the Eskay Creek project in British Columbia and Barrick waived its back-in right on the Eskay Creek project. The consideration under the definitive agreement consisted of: (i) the issuance by Skeena of 22,500,000 units (the “Units”), with each Unit comprising one common share of Skeena and one half of a warrant, with each whole warrant entitling Barrick to purchase one additional common share of Skeena at an exercise price of C$2.70 each until the second anniversary of the closing date; (ii) the grant of a 1% net smelter return (“NSR”) royalty on the entire Eskay Creek land package; and (iii) a contingent payment of C$15 million payable during a 24-month period after closing. The transaction closed on October 5, 2020 and we recognized a gain of $59 million for the year ended December 31, 2020. Refer to note 4 to the Financial Statements for more information.

Sale of Morila
On November 10, 2020, Barrick and AngloGold Ashanti Limited completed the sale of our combined 80% interest in the Morila gold mine in Mali to Firefinch Limited (previously Mali Lithium Limited) for $28.8 million cash consideration. The State of Mali continues to hold the remaining 20% of the Morila gold mine. The consideration received was allocated against the interests that AngloGold Ashanti and Barrick held in Morila, as well as intercompany loans that Barrick held against Morila, and the transaction resulted in a gain for Barrick of $27 million for the year ended December 31, 2020. Refer to note 4 to the Financial Statements for more information.

Sale of Massawa
On March 4, 2020, Barrick and our Senegalese joint venture partner completed the sale of our aggregate 90% interest in the Massawa project (“Massawa”) in Senegal to Teranga Gold Corporation (“Teranga”) for total consideration fair valued at $440 million on the date of closing. Barrick received 92.5% of the consideration for its interest in the Massawa project, with the balance received by Barrick’s local Senegalese partner. Barrick received a net of $256 million in cash and 19,164,403 Teranga common shares (worth $104 million at the date of closing) plus a contingent payment of up to $46.25 million based on the three-year average gold price, which was valued at $28 million at the date of closing. The cash consideration received was net of $25 million that Barrick provided through its participation in the $225 million syndicated debt financing facility secured by Teranga in connection with the transaction. Subsequent to year-end, we received full repayment of the outstanding loan. The difference between the fair value of consideration received and the carrying value of the assets on closing was $54 million and was recognized as a gain in the first quarter of 2020. Refer to note 4 to the Financial Statements for more information.

Tanzania
On January 24, 2020, Barrick announced that the Company had ratified the creation of Twiga Minerals Corporation (“Twiga”) at a signing ceremony with the President of Tanzania, formalizing the establishment of a joint venture between Barrick and the GoT and resolution of all outstanding disputes between Barrick and the GoT, including the lifting of the previous concentrate export ban, effective immediately. Effective January 1, 2020, the GoT
received a free carried shareholding of 16% in each of our Tanzanian mines (Bulyanhulu, Buzwagi and North Mara), a 16% interest in the shareholder loans owed by the operating companies and will receive half of the economic benefits from the Tanzanian operations in the form of taxes, royalties, clearing fees and participation in all cash distributions made by the mines and Twiga, after the recoupment of capital investments. 
The terms of the signed agreement are consistent with those previously announced, including the payment of $300 million to settle all outstanding tax and other disputes (the “Settlement Payment”); the lifting of the concentrate export ban; the sharing of future economic benefits from the mines on a 50/50 basis; and a dispute resolution mechanism that provides for binding international arbitration. The 50/50 division of economic benefits will be maintained through an annual true-up mechanism, which is exclusive of the Settlement Payment.
Barrick and the GoT continue efforts to fulfill their respective obligations to satisfy all conditions of the signed agreement, primarily with respect to the execution and delivery of formal termination documents for the settlement of all outstanding disputes between the two parties. In the second quarter of 2020, exports of the concentrate stockpiled in Tanzania commenced and we began recognizing these sales in revenue and cost of sales. We subsequently completed the export of the remaining stockpiled concentrate during the third quarter of 2020. As a result, we made a payment of $100 million to the GoT, representing the first installment of the Settlement Payment, in the second quarter of 2020, reducing the previously recorded Settlement Payment liability of $300 million on the balance sheet.
Operating results for the Tanzanian mines are included at 84% from January 1, 2020. We recognized a net impairment reversal of $91 million ($304 million before tax) resulting from the agreement with the GoT being made effective in the first quarter of 2020. Refer to note 21 to the Financial Statements for more information.

Partial Monetization of Investment in Shandong Gold
In June 2020, we sold 79,268,800 shares of Shandong Gold Mining Co., Ltd. (“Shandong Gold”), for gross proceeds of approximately $210 million. Barrick continues to hold 10,250,000 shares of Shandong Gold, representing a 2.05% interest in Shandong Gold’s Hong-Kong listed (H-class) shares, re-affirming its commitment to the strong existing long-term strategic partnership between the two companies.

Debt Management
On January 31, 2020, Barrick paid $356 million, including $4 million of accrued and unpaid interest, to complete a make-whole repurchase of the $337 million of outstanding principal on our 3.85% Notes due April 2022. A loss on debt extinguishment of $15 million was recorded in the first quarter of 2020. The debt repayment is expected to result in an annualized interest saving of $13 million.
In October 2020, Moody’s Investors Service (“Moody’s”) upgraded Barrick’s senior unsecured ratings to Baa1 from Baa2 while maintaining a stable outlook.
BARRICK YEAR-END 2020
15
MANAGEMENT’S DISCUSSION AND ANALYSIS


Outlook for 2021

Operating Division Guidance
Our 2020 actual gold and copper production, cost of sales, total cash costs4, all-in sustaining costs4 and 2021 forecast gold and copper production, cost of sales, total cash costs4 and all-in sustaining costs4 ranges by operating division are as follows: 
Operating Division 2020 attributable production (000s ozs)
2020 cost of salesa
($/oz)
2020 total cash costsb
($/oz)
2020 all-in sustaining costsb
($/oz)
2021 forecast attributable production (000s ozs)
2021 forecast cost of salesa ($/oz)
2021 forecast total cash costsb ($/oz)
2021 forecast all-in sustaining costsb ($/oz)
Gold
Carlin (61.5%)c
1,024 976 790 1,041 940 - 1,000 920 - 970 740 - 790 1,050 - 1,100
Cortez (61.5%) 491 957 678 998 500 - 550 1,000 - 1,050 700 - 750 940 - 990
Turquoise Ridge (61.5%) 330 1,064 711 798 390 - 440 950 - 1,000 620 - 670 810 - 860
Phoenix (61.5%) 126 1,772 649 814 100 - 120 1,800 - 1,850 725 - 775 970 - 1,020
Long Canyon (61.5%) 160 869 236 405 140 - 160 800 - 850 180 - 230 240 - 290
Nevada Gold Mines (61.5%) 2,131 1,029 702 941 2,100 - 2,250 980 - 1,030 660 - 710 910 - 960
Hemlo 223 1,256 1,056 1,423 200 - 220 1,200 - 1,250 950 - 1,000 1,280 - 1,330
North America 2,354 1,050 735 987 2,300 - 2,450 990 - 1,040 690 - 740 940 - 990
Pueblo Viejo (60%) 542 819 504 660 470 - 510 880 - 930 520 - 570 760 - 810
Veladero (50%) 226 1,151 748 1,308 130 - 150 1,510 - 1,560 820 - 870 1,720 - 1,770
Porgera (47.5%)d
86 1,225 928 1,115
Latin America & Asia Pacific 854 938 604 856 600 - 660 1,050 - 1,100 600 - 650 1,000 - 1,050
Loulo-Gounkoto (80%) 544 1,060 666 1,006 510 - 560 980 - 1,030 630 - 680 930 - 980
Kibali (45%) 364 1,091 608 778 350 - 380 990 - 1,040 590 - 640 800 - 850
North Mara (84%) 261 992 702 929 240 - 270 970 - 1,020 740 - 790 960 - 1,010
Tongon (89.7%) 255 1,334 747 791 180 - 200 1,470 - 1,520 1,000 - 1,050 1,140 - 1,190
Bulyanhulu (84%) 44 1,499 832 895 170 - 200 980 - 1,030 580 - 630 810 - 860
Buzwagi (84%) 84 1,021 859 871 30 - 40 1,360 - 1,410 1,250 - 1,300 1,230 - 1,280
Africa & Middle East 1,552 1,119 701 893 1,500 - 1,600 1,050 - 1,100 690 - 740 920 - 970
Total Attributable to Barricke,f,g
4,760 1,056 699 967 4,400 - 4,700 1,020 - 1,070 680 - 730 970 - 1,020
  2020 attributable production (M lbs)
2020 cost of salesa
($/lb)
2020 C1 cash costsb ($/lb)
2020 all-in sustaining costsb
($/lb)
2021 forecast attributable production
(M lbs)
2021 forecast cost of salesa
($/lb)
2021 forecast C1 cash costsb ($/lb)
2021 forecast all-in sustaining costsb ($/lb)
Copper
  Lumwana 276 2.01 1.56 2.43 250 - 280 1.85 - 2.05 1.45 - 1.65 2.25 - 2.45
  Zaldívar (50%) 106 2.46 1.79 2.25 90 - 110 2.30 - 2.50 1.65 - 1.85 1.90 - 2.10
      Jabal Sayid (50%) 75 1.42 1.11 1.24 70 - 80 1.40 - 1.60 1.10 - 1.30 1.30 - 1.50
Total Copperg
457 2.02 1.54 2.23 410 - 460 1.90 - 2.10 1.40 - 1.60 2.00 - 2.20
a.Cost of sales applicable to gold per ounce is calculated using cost of sales applicable to gold on an attributable basis (removing the non-controlling interest of 38.5% of Nevada Gold Mines (including 63.1% of South Arturo), 40% of Pueblo Viejo, 20% of Loulo-Gounkoto, 10.3% of Tongon, and 16% of North Mara, Bulyanhulu and Buzwagi from cost of sales and including our proportionate share of cost of sales attributable to our equity method investment in Kibali), divided by attributable gold ounces sold. Cost of sales applicable to copper per pound is calculated using cost of sales applicable to copper including our proportionate share of cost of sales attributable to our equity method investments in Zaldívar and Jabal Sayid, divided by consolidated copper pounds sold (including our proportionate share of copper pounds sold from our equity method investments).
b.Total cash costs, all-in sustaining costs and C1 cash costs are non-GAAP financial performance measures with no standardized meaning under IFRS and therefore may not be comparable to similar measures of performance presented by other issuers. For further information and a detailed reconciliation of the non-GAAP measures used in this section of the MD&A to the most directly comparable IFRS measures, please see pages 96 to 122 of this MD&A.
c.Includes our 36.9% share of South Arturo.
d.Based on the communication we received from the Government of Papua New Guinea that the SML will not be extended, Porgera was placed on temporary care and maintenance on April 25, 2020 to ensure the safety and security of our employees and communities. Due to the uncertainty related to the timing and scope of future developments on the mine’s operating outlook, 2021 guidance for Porgera has not been included.
e.Total cash costs and all-in sustaining costs per ounce include costs allocated to non-operating sites.
f.Operating division guidance ranges reflect expectations at each individual operating division, and may not add up to the company-wide guidance range total. The company-wide 2020 results and 2021 guidance ranges exclude Pierina, Lagunas Norte, and Golden Sunlight, which are mining incidental ounces as they enter closure.
g.Includes corporate administration costs.


BARRICK YEAR-END 2020
16
MANAGEMENT’S DISCUSSION AND ANALYSIS


Operating Division, Consolidated Expense and Capital Guidance
Our 2020 actual gold and copper production, cost of sales, total cash costs4, all-in sustaining costs4, consolidated expenses and capital expenditures and 2021 forecast gold and copper production, cost of sales, total cash costs4, all-in sustaining costs4, consolidated expenses and capital expenditures are as follows:
 
($ millions, except per ounce/pound  data)
2020 Guidancea
2020 Actual
2021 Guidancea
Gold production
Production (millions of ounces) 4.60 - 5.00 4,760 4.40 - 4.70
Gold cost metrics
Cost of sales - gold ($ per oz) 980 - 1,030 1,056 1,020 - 1,070
 Total cash costs ($ per oz)b
650 - 700 699 680 - 730
Depreciation ($ per oz) 300 - 330 326 300 - 330
 All-in sustaining costs ($ per oz)b
920 - 970 967 970 - 1,020
Copper production
Production (millions of pounds) 440 - 500 457 410 - 460
Copper cost metrics
Cost of sales - copper ($ per lb) 2.10 - 2.40 2.02 1.90 - 2.10
 C1 cash costs ($ per lb)b
1.50 - 1.80 1.54 1.40 - 1.60
Depreciation ($ per lb) 0.60 - 0.70 0.67 0.60 - 0.70
 All-in sustaining costs ($ per lb)b
2.20 - 2.50 2.23 2.00 - 2.20
Exploration and project expenses 280 - 320 295 280 - 320
Exploration and evaluation 210 - 230 222 230 - 250
Project expenses 70 - 90 73 50 - 70
General and administrative expenses ~170 185 ~190
Corporate administration ~130 118 ~130
 Stock-based compensationc
~40 67 ~60
Other expense (income) 80 - 100 (178) 80 - 100
Finance costs, net 400 - 450 347 330 - 370
Attributable capital expenditures:
Attributable minesite sustaining 1,300 - 1,500 1,277 1,250 - 1,450
Attributable project 300 - 400 374 550 - 650
Total attributable capital expendituresd
1,600 - 1,900 1,651 1,800 - 2,100

a.Based on the communication we received from the Government of Papua New Guinea that the SML will not be extended, Porgera was placed on temporary care and maintenance on April 25, 2020. Due to the uncertainty related to the timing and scope of future developments on the mine’s operating outlook, full year 2020 guidance for Porgera was withdrawn, as detailed in Barrick’s Q1 2020 Report issued on May 6, 2020. Exclusively due to this development at Porgera, 2020 gold production for the Company was adjusted to 4.6 to 5.0 million ounces (from 4.8 to 5.2 million ounces previously). All remaining guidance metrics for 2020 were unchanged. In addition, 2021 guidance excludes Porgera. Separately, 2020 guidance was based on a gold price assumption of $1,350 per ounce. This compares to the $1,700 per ounce gold price assumption used for 2021, which results in a higher year-over-year expectation for royalty expenses and therefore, our per ounce cost metrics.
b.Total cash costs, all-in sustaining costs and C1 cash costs are non-GAAP financial performance measures with no standardized meaning under IFRS and therefore may not be comparable to similar measures of performance presented by other issuers. For further information and a detailed reconciliation of the non-GAAP measures used in this section of the MD&A to the most directly comparable IFRS measures, please see pages 96 to 122 of this MD&A.
c.2020 actual results are based on a US$22.78 share price and 2021 guidance is based on a one-month trailing average ending December 31, 2020 of US$23.27 per share.
d.Attributable capital expenditures are presented on the same basis as guidance, which includes our 61.5% share of Nevada Gold Mines, our 60% share of Pueblo Viejo, our 80% share of Loulo-Gounkoto, our 89.7% share of Tongon, our 84% share of North Mara, Bulyanhulu and Buzwagi and our 50% share of Zaldívar and Jabal Sayid.

BARRICK YEAR-END 2020
17
MANAGEMENT’S DISCUSSION AND ANALYSIS


2021 Guidance Analysis
Estimates of future production, cost of sales, and total cash costs4 presented in this MD&A are based on mine plans that reflect the expected method by which we will mine reserves at each site. Actual gold and copper production and associated costs may vary from these estimates due to a number of operational and non-operational risk factors (see the “Cautionary Statement on Forward-Looking Information” on page 24 of this MD&A for a description of certain risk factors that could cause actual results to differ materially from these estimates).

Gold Production
We expect 2021 gold production to be in the range of 4.4 to 4.7 million ounces, anchored by stable year-over-year performance from our North America and Africa & Middle East regions. Five of our six Tier One Gold Assets1 are located across these two regions, highlighting the importance of a world-class asset base in delivering consistent performance with the potential for significant brownfields expansion and new discoveries.
Our 2021 gold production guidance currently excludes Porgera. This is due to the uncertainty related to the timing and scope of future operations at Porgera following the decision to place the mine on temporary care and maintenance on April 25, 2020 to ensure the safety and security of our employees and communities. As this is an evolving situation, we will re-assess on an ongoing basis and provide further updates in due course. We remain in constructive discussions with the Government of Papua New Guinea and are optimistic about finding a solution to allow operations at Porgera to resume in 2021.
As previously disclosed, the response to the Covid-19 pandemic in Argentina temporarily delayed the construction and commissioning of the Phase 6 leach pad at Veladero in 2020. As the operation now transitions to Phase 6, which is on-track for commissioning by the end of the first half of 2021, the focus at Veladero will be on ensuring the delivery of our optimized 10-year plan including the start of the Cuatro Esquinas pit pushback and the acceleration of brownfields and infill drilling. We continue to expect stronger performance at Veladero in the second half of 2021 after commissioning of Phase 6, as heap leach processing operations will be reduced during the transition phase.
In addition to this event at Veladero, the Company’s gold production in the second half of 2021 is expected to be slightly higher than the first half. This is mainly driven by mine sequencing at Nevada Gold Mines as well as the ramp-up of underground mining and processing operations at Bulyanhulu. This is partially offset by Buzwagi, which is expected to enter care and maintenance starting from the third quarter of 2021, in line with previous disclosures.

Gold Cost of Sales per Ounce5
On a per ounce basis, cost of sales applicable to gold5, after removing the portion related to non-controlling interests, is expected to be in the range of $1,020 to $1,070 per ounce in 2021, compared to the 2020 actual result of $1,056 per ounce.
The expected increase compared to the 2020 guidance range reflects higher royalty expenses due to the increase in our gold price assumption to $1,700 per ounce for 2021 (from $1,350 per ounce used for our 2020 guidance), as well as changes in the expected sales mix as
described further in the “Gold Total Cash Costs per Ounce4” section below.

Gold Total Cash Costs per Ounce4
Total cash costs per ounce4 are expected to be in the range of $680 to $730 per ounce, compared to the 2020 actual result of $699 per ounce.
The expected increase compared to the 2020 guidance range reflects higher royalty expenses due to the increase in our gold price assumption to $1,700 per ounce for 2021 (from $1,350 per ounce used for our 2020 guidance), as well as changes in the expected sales mix.
In North America, our 2021 guidance for total cash costs per ounce4 for Nevada Gold Mines of $660 to $710 compares to the 2020 actual result of $702 per ounce. This expectation of lower costs is driven by the benefit of continued performance improvement at Turquoise Ridge, which is a higher-grade operation and has a comparatively lower cost structure. At Hemlo, total cash costs per ounce4 are also expected to improve relative to 2020, largely driven by lower royalty expenses due to a change in sales mix (using our assumed gold price), the ramp-up in underground performance and improved mining flexibility as a result of access from the new portal to the Upper C Zone in the third quarter of 2021.
In Latin America & Asia Pacific, total cash costs per ounce4 at Pueblo Viejo are expected to be higher in 2021 due to lower grades compared to the prior year. This is in line with the mine and stockpile processing plan at Pueblo Viejo, as we advance development of the plant and tailings expansion project. At Veladero, the expected higher year-over-year total cash costs per ounce4 is mainly driven by the transition to Phase 6 described above.
In Africa & Middle East, total cash costs per ounce4 at both Loulo-Gounkoto and Kibali in 2021 are expected to be consistent with prior year performance, reflecting their status as Tier One Gold Assets1. While total cash costs per ounce4 at Bulyanhulu are expected to improve year-over-year based on the ramp-up of underground mining and processing of fresh ore, we expect higher costs at North Mara due to mill feed sequencing. As previously disclosed, we have extended the life of mine at Tongon with the prospect of further optionality from our exploration programs, resulting in a lower year-over-year production profile starting from 2021 at a higher total cash costs per ounce4. At Buzwagi, the expected increase in total cash costs per ounce4 reflects the end of the life of this mine and the expectation that the mine will enter care and maintenance from the third quarter of 2021.

Gold All-In Sustaining Costs per Ounce4
All-in sustaining costs per ounce4 in 2021 are expected to be in the range of $970 to $1,020 per ounce, compared to the 2020 actual result of $967 per ounce. This is based on the expectation that minesite sustaining capital expenditures on a per ounce basis will be higher (refer to Capital Expenditure commentary below for further detail).
The expected increase compared to the 2020 guidance range also reflects higher royalty expenses due to the increase in our gold price assumption to $1,700 per ounce for 2021 (from $1,350 per ounce used for our 2020 guidance), as well as changes in the expected sales mix as described in the Gold Total Cash Costs per Ounce4 section.

BARRICK YEAR-END 2020
18
MANAGEMENT’S DISCUSSION AND ANALYSIS


Copper Production and Costs
We expect 2021 copper production to be in the range of 410 to 460 million pounds, compared to actual production of 457 million pounds in 2020. Production in the second half of 2021 is expected to be stronger than the first half, with higher grades expected from Lumwana and major maintenance at Zaldívar scheduled in the second quarter of 2021.
In 2021, cost of sales applicable to copper5 is expected to be in the range of $1.90 to $2.10 per pound, in line with the actual result of $2.02 per pound for 2020. C1 cash costs per pound4 guidance of $1.40 to $1.60 per pound for 2021 is also in line with the 2020 actual result of $1.54 per pound. Copper all-in sustaining costs per pound4 guidance of $2.00 to $2.20 for 2021 represents an improvement from the actual result of $2.23 in 2020.

Exploration and Project Expenses
We expect to incur approximately $280 to $320 million of exploration and project expenses in 2021. This is unchanged from our 2020 guidance range and compares to the 2020 actual result of $295 million.
Within this range, we expect our exploration and evaluation expenditures in 2021 to be approximately $230 to $250 million. This is marginally higher than the 2020 actual result of $222 million based on the expectation of increased minesite exploration and evaluation expenditures with the aim of allowing us to improve our resource and reserve conversion over the coming years.
We also expect to incur approximately $50 to $70 million of project expenses in 2021, compared to $73 million in 2020. Project expenses are mainly related to the ongoing site costs at Pascua-Lama as well as project evaluation costs across our portfolio.

General and Administrative Expenses
In 2021, we expect corporate administration costs to be approximately $130 million, unchanged from our 2020 guidance, and an expected increase of $12 million compared to actual 2020 costs, as we expect travel and office expenses to return to pre-pandemic levels.
Separately, stock-based compensation expense in 2021 is expected to be approximately $60 million based on a share price assumption of $23.27.

Finance Costs, Net
In 2021, net finance costs of $330 to $370 million primarily represents interest expense on long-term debt, non-cash interest expense relating to the gold and silver streaming agreements at Pueblo Viejo, and accretion, net of finance income. This guidance for 2021 is consistent with the actual 2020 result of $347 million.
Capital Expenditures
Total attributable gold and copper capital expenditures for 2021 are expected to be in the range of $1,800 to $2,100 million. As expected and previously disclosed, this guidance for 2021 includes capital expenditures deferred from 2020 as a result of quarantine and movement restrictions in response to the Covid-19 pandemic.
We continue to focus on the delivery of our project capital pipeline and expect attributable project capital expenditures to be in the range of $550 to $650 million in 2021, compared to actual expenditures of $374 million in 2020. The expected increase is mainly driven by the ramp-up of construction activities for the plant and tailings expansion project at Pueblo Viejo and to a lesser extent, the development of the Zaldívar Chloride Leach Project and the third underground mine at Loulo-Gounkoto. The remainder of expected project capital expenditures is mainly related to underground development and infrastructure at Goldrush, the third shaft project at Turquoise Ridge, the ramp-up of underground mining and processing operations at Bulyanhulu and our investment in water management initiatives and a paste backfill plant at North Mara.
Attributable minesite sustaining capital expenditures in 2021 are expected to be in the range of $1,250 to $1,450 million, which is a slight reduction on the guidance range for 2020, and compares to the actual spend for 2020 of $1,277 million. The guidance range for 2021 partially reflects the deferral of capital expenditures from 2020 due to the impact of the Covid-19 pandemic, including the Phase 6 leach pad expansion at Veladero, as described in the “Gold Production” section above. In addition to this, compared to the prior year, minesite sustaining capital expenditures in 2021 are expected to increase at both Bulyanhulu and Turquoise Ridge due to underground development, at Carlin due to increased underground development and process facility improvements, at Tongon related to the life of mine extension and at Kibali due to higher capitalized stripping.

Effective Income Tax Rate
Based on a gold price assumption of $1,700/oz, our expected effective tax rate range for 2021 is 28% to 34%. The rate is sensitive to the relative proportion of sales in high versus low tax jurisdictions, realized gold and copper prices, the proportion of income from our equity accounted investments and the level of non-tax affected costs in countries where we generate net losses.  


Outlook Assumptions and Economic Sensitivity Analysis
   2021 Guidance Assumption Hypothetical Change
Impact on EBITDAa (millions)
Impact on TCC, C1 Cash Costs and AISCa
  
Gold price sensitivity $1,700/oz +/- $100/oz
+/-$620
+/-$4/oz
Copper price sensitivity $2.75/lb
+/-$0.25/lb
+/- $60
+/-$0.01/lb
a.EBITDA, total cash costs, C1 cash costs and and all-in sustaining costs are non-GAAP financial performance measures with no standardized definition under IFRS. For further information and a detailed reconciliation, please see pages 96 to 122 of this MD&A.


BARRICK YEAR-END 2020
19
MANAGEMENT’S DISCUSSION AND ANALYSIS



Risks and Risk Management
Overview
The ability to deliver on our vision, strategic objectives and operating guidance depends on our ability to understand and appropriately respond to the uncertainties or “risks” we face that may prevent us from achieving our objectives. In order to achieve this we:
Maintain a framework that permits us to manage risk effectively and in a manner that creates the greatest value;
Integrate a process for managing risk into all our important decision-making processes so that we reduce the effect of uncertainty on achieving our objectives;
Actively monitor key controls we rely on to achieve the Company’s objectives so that they remain in place and are effective at all times; and
Provide assurance to senior management and relevant committees of the Board on the effectiveness of key control activities.

Board and Committee Oversight
We maintain strong risk oversight practices, with responsibilities outlined in the mandates of the Board and related committees. The Board’s mandate is clear on its responsibility for reviewing and discussing with management the processes used to assess and manage risk, including the identification by management of the principal risks of the business, and the implementation of appropriate systems to deal with such risks.
The Audit & Risk Committee assists the Board in overseeing the Company’s management of principal risks and the implementation of policies and standards for monitoring and modifying such risks, as well as monitoring and reviewing the Company’s financial position and financial risk management programs. The Corporate Governance & Nominating Committee assists the Board in overseeing the Company’s policies and performance for its environmental, health and safety, corporate social responsibility and human rights programs.

Management Oversight
Our weekly Executive Committee Review is the main forum for senior management to raise and discuss risks facing the operations and organization more broadly. At regularly scheduled meetings, the Board and the Audit & Risk Committee are provided with updates on the key issues identified by management at these weekly sessions.

Principal Risks
The following subsections describe some of our key sources of uncertainty and most important risk modification activities. The risks described below are not the only ones facing Barrick. Our business is subject to inherent risks in financial, regulatory, strategic and operational areas. For a more comprehensive discussion of those inherent risks, see “Risk Factors” in our most recent Form 40-F/Annual Information Form on file with the SEC and Canadian provincial securities regulatory authorities. Also see the “Cautionary Statement on Forward-Looking Information” on page 24 of this MD&A.

Financial position and liquidity
Our liquidity profile, level of indebtedness and credit ratings are all factors in our ability to meet short-and long-term financial demands. Barrick’s outstanding debt balances
impact liquidity through scheduled interest and principal repayments and the results of leverage ratio calculations, which could influence our investment grade credit ratings and ability to access capital markets. In addition, our ability to draw on our credit facility is subject to meeting its covenants. Our primary source of liquidity is our operating cash flow, which is dependent on the ability of our operations to deliver projected future cash flows. The ability of our operations to deliver projected future cash flows, as well as future changes in gold and copper market prices, either favorable or unfavorable, will continue to have a material impact on our cash flow and liquidity.

Key risk modification activities:
Continued focus on generating positive free cash flow by improving the underlying cost structures of our operations in a sustainable manner;
Disciplined capital allocation criteria for all investments, to ensure a high degree of consistency and rigor is applied to all capital allocation decisions based on a comprehensive understanding of risk and reward;
Preparation of budgets and forecasts to understand the impact of different price scenarios on liquidity, and formulate appropriate strategies;
Review of debt and net debt levels to ensure appropriate leverage and monitor the market for liability management opportunities; and
Other options available to the Company to enhance liquidity include drawing on our $3.0 billion undrawn credit facility, asset sales, joint ventures, or the issuance of debt or equity securities.

Improving free cash flow4 and costs
Our ability to improve productivity, drive down operating costs and reduce working capital remains a focus in 2021 and is subject to several sources of uncertainty. This includes our ability to achieve and maintain industry-leading margins by improving the productivity and efficiency of our operations through automation.

Key risk modification activities:
Maximizing the benefit of higher gold prices through agile management and operational execution;
Weekly Executive Committee Review to identify, assess and respond to risks in a timely manner;
Enabling simplification and agile decision making through unification of business systems; and
A flat, operationally focused, agile management structure with a tenet in ownership culture.

Social license to operate
At Barrick, we are committed to building, operating, and closing our mines in a safe and responsible manner. To do this, we seek to build trust-based partnerships with host governments and local communities to drive shared long-term value while working to minimize the social and environmental impacts of our activities. Geopolitical risks such as resource nationalism and incidents of corruption are inherent in the business of a company operating globally. Past environmental incidents in the extractive industry highlight the hazards (e.g., water management, tailings storage facilities, etc.) and the potential consequences to the environment, community health and safety. Our ability to maintain compliance with regulatory and community obligations in order to protect the
BARRICK YEAR-END 2020
20
MANAGEMENT’S DISCUSSION AND ANALYSIS


environment and our host communities alike remains one of our top priorities. Barrick also recognizes climate change as an area of risk requiring specific focus.
 
Key risk modification activities:
Our commitment to responsible mining is supported by a robust governance framework, including an overarching Sustainable Development Policy and related policies in the areas of Biodiversity, Social Performance, Occupational Health and Safety, Environment and Human Rights;
Implementation of an ESG scorecard to track our sustainability performance using key performance indicators aligned to priority areas set out in our strategy;
Mandatory training on our Code of Business Conduct and Ethics as well as supporting policies which set out the ethical behavior expected of everyone working at, or with, Barrick;
We take a partnership approach with our host governments. This means we work to balance our own interests and priorities with those of our government partners, working to ensure that everyone derives real value from our operations;
We open our social and environmental performance to third-party scrutiny, including through the ISO 14001 re-certification process, International Cyanide Management Code audits, and annual human rights impact assessments;
Our climate change strategy has three pillars: Identify, understand and mitigate the risks associated with climate change; Measure and reduce our impacts on climate change; and Improve our disclosure on climate change;
We established site-specific emergency response plans as well as regional crisis management plans to manage any manifestation of Covid-19 in or near our mines globally; and
We continuously review and update our closure plans and cost estimates to plan for environmentally responsible closure and monitoring of operations.

Resources and reserves and production outlook
Like any mining company, we face the risk that we are unable to discover or acquire new resources or that we do not convert resources into production. As we move into 2021 and beyond, our overriding objective of growing free cash flow per share continues to be underpinned by a strong pipeline of organic projects and minesite expansion opportunities in our core regions. Uncertainty related to these and other opportunities exists (potentially both favorable and unfavorable) due to the speculative nature of mineral exploration and development as well as the potential for increased costs, delays, suspensions and technical challenges associated with the construction of capital projects.

Key risk modification activities:
Focus on responsible mineral resource management, continuously improve ore body knowledge, and add to reserves and resources;
Grow and invest in a portfolio of Tier One Gold Assets1, Tier Two Gold Assets and Strategic Assets2 with an emphasis on organic growth to leverage our existing footprint; and
Invest in exploration across extensive land positions in many of the world’s most prolific gold districts.
Market Overview
The market prices of gold and, to a lesser extent, copper are the primary drivers of our profitability and our ability to generate free cash flow4 for our shareholders.

Gold
The price of gold is subject to volatile price movements over short periods of time and is affected by numerous industry and macroeconomic factors. During 2020, the gold price ranged from $1,452 per ounce to an all-time high of $2,075 per ounce. The average market price for the year of $1,770 per ounce represented an increase of 27% versus 2019.

AVERAGE MONTHLY SPOT GOLD PRICES
(dollars per ounce)
goldprice1a.jpg
The price of gold rose significantly during the middle part of the year, reaching an all-time high in August. During the year, the gold price rose as a result of the financial impacts of Covid-19, including global economic uncertainty, the expected longer-term effects of fiscal and monetary stimulus measures, and a weakening of the trade-weighted US dollar, leading to an increase in investor interest in gold as a safe haven.

Copper
During 2020, London Metal Exchange (“LME”) copper prices traded in a wide range of $1.98 to $3.64 per pound, averaged $2.80 per pound, and closed the year at $3.51 per pound. Copper prices are significantly influenced by physical demand from emerging markets, especially China.
Copper prices fell to four-year lows in March due to initial concerns and near-term economic impacts from the spread of Covid-19, but subsequently rose to seven-year highs in December due to the recovery in demand from China, a weakening US dollar, low global stockpile levels, and the expected impact of global financial stimulus measures.

AVERAGE MONTHLY SPOT COPPER PRICES
(dollars per pound)
copperprice1a.jpg
BARRICK YEAR-END 2020
21
MANAGEMENT’S DISCUSSION AND ANALYSIS


We have provisionally priced copper sales for which final price determination versus the relevant copper index is outstanding at the balance sheet date. As at December 31, 2020, we recorded 49 million pounds of copper sales still subject to final price settlement at an average provisional price of $3.17 per pound. The impact to net income before taxation of a 10% movement in the market price of copper would be approximately $16 million, holding all other variables constant.

Currency Exchange Rates
The results of our mining operations outside of the United States are affected by US dollar exchange rates. We have exposure to the Argentine peso through operating costs at our Veladero mine, and peso denominated VAT receivable balances. In addition, we have exposure to the Canadian and Australian dollars, Chilean peso, Papua New Guinea kina, Peruvian sol, Zambian kwacha, Tanzanian shilling, Dominican peso, West African CFA franc, Euro, South African rand, and British pound through mine operating and capital costs.
Fluctuations in the US dollar increase the volatility of our costs reported in US dollars. In 2020, the Australian dollar traded in a range of $0.55 to $0.73 against the US dollar, while the US dollar against the Canadian dollar, Argentine peso, and West African CFA franc ranged from $1.27 to $1.47, ARS 59.53 to ARS 84.16, and XOF 533 to XOF 617, respectively. Due to inflation pressures in Argentina and government actions, there was a continued weakening of the Argentine peso during the year. During 2020, we did not have any currency hedge positions, and are unhedged against foreign exchange exposures as at December 31, 2020 beyond spot requirements.

Fuel
For 2020, the price of West Texas Intermediate (“WTI”) crude oil traded in a wide range between negative $40 and positive $66 per barrel, with an average market price of $39 per barrel, and closed the year at $49 per barrel. Oil prices were significantly impacted by a sharp near-term reduction in global demand as a result of a decrease in economic activity caused by the spread of Covid-19.

AVERAGE MONTHLY SPOT CRUDE OIL PRICE (WTI)
(dollars per barrel)
oilprice1a.jpg
During 2020, we did not have any fuel hedge positions, and are unhedged against fuel exposures as at December 31, 2020.


US Dollar Interest Rates
After four years of benchmark rate increases by the US Federal Reserve, the benchmark rate was lowered by 75 basis points over the course of 2019 to a range of 1.50% to 1.75% in an effort to keep the economy stable during a period of slowing growth and global trade uncertainty. During March 2020, rates were lowered to a range of 0.00% to 0.25% as a result of the economic impacts of the spread of Covid-19 and kept at that level through the remainder of the year. Further changes to short-term rates in 2021, if any, are expected to be dependent on economic data.
At present, our interest rate exposure mainly relates to interest income received on our cash balances ($5.2 billion at December 31, 2020); the mark-to-market value of derivative instruments; the carrying value of certain long-lived assets and liabilities; and the interest payments on our variable-rate debt ($0.1 billion at December 31, 2020). Currently, the amount of interest expense recorded in our consolidated statement of income is not materially impacted by changes in interest rates, because the majority of debt was issued at fixed interest rates. The relative amounts of variable-rate financial assets and liabilities may change in the future, depending on the amount of operating cash flow we generate, as well as the level of capital expenditures and our ability to borrow on favorable terms using fixed rate debt instruments. Changes in interest rates affect the accretion expense recorded on our provision for environmental rehabilitation and therefore would affect our net earnings.



BARRICK YEAR-END 2020
22
MANAGEMENT’S DISCUSSION AND ANALYSIS


Production and Cost Summary - Gold
For the three months ended For the years ended
12/31/20 9/30/20 Change 12/31/20 12/31/19  Change 12/31/18
Nevada Gold Mines (61.5%)a
Gold produced (000s oz) 546  538  1% 2,131 2,218 (4%) 2,368
Cost of sales ($/oz) 1,007  1,060  (5%) 1,029 924 11% 814
Total cash costs ($/oz)b
667  723  (8%) 702 634 11% 526
All-in sustaining costs ($/oz)b
873  956  (9%) 941 828 14% 664
Carlin (61.5%)c
Gold produced (000s oz) 260  276  (6%) 1,024 968 6% 835
Cost of sales ($/oz) 917  985  (7%) 976 1,004 (3%) 1,054
Total cash costs ($/oz)b
740  800  (8%) 790 746 6% 740
All-in sustaining costs ($/oz)b
1,005  1,036  (3%) 1,041 984 6% 983
Cortez (61.5%)d
Gold produced (000s oz) 118  113  4% 491 801 (39%) 1,265
Cost of sales ($/oz) 1,043  1,060  (2%) 957 762 26% 659
Total cash costs ($/oz)b
738  763  (3%) 678 515 32% 351
All-in sustaining costs ($/oz)b
906  1,133  (20%) 998 651 53% 430
Turquoise Ridge (61.5%)e
Gold produced (000s oz) 91  76  20% 330 335 (2%) 268
Cost of sales ($/oz) 1,064  1,097  (3%) 1,064 846 26% 783
Total cash costs ($/oz)b
687  745  (8%) 711 585 22% 678
All-in sustaining costs ($/oz)b
757  805  (6%) 798 732 9% 756
Phoenix (61.5%)f
Gold produced (000s oz) 26  30  (13%) 126 56 125%
Cost of sales ($/oz) 2,054  1,773  16% 1,772 2,093 (15%)
Total cash costs ($/oz)b
590  520  13% 649 947 (31%)
All-in sustaining costs ($/oz)b
670  659  2% 814 1,282 (37%)
Long Canyon (61.5%)f
Gold produced (000s oz) 51  43  19% 160 58 176%
Cost of sales ($/oz) 674  877  (23%) 869 1,088 (20%)
Total cash costs ($/oz)b
145  212 (32%) 236 333 (29%)
All-in sustaining costs ($/oz)b
324  384  (16%) 405 681 (41%)
Pueblo Viejo (60%)
Gold produced (000s oz) 159  129  23% 542 590 (8%) 581
Cost of sales ($/oz) 803  791  2% 819 747 10% 750
Total cash costs ($/oz)b
493  450  9% 504 471 7% 465
All-in sustaining costs ($/oz)b
689  609  13% 660 592 12% 623
Loulo-Gounkoto (80%)g
Gold produced (000s oz) 123  139  (12%) 544 572 (5%)
Cost of sales ($/oz) 1,149  1,088  6% 1,060 1,044 2%
Total cash costs ($/oz)b
734  682  8% 666 634 5%
All-in sustaining costs ($/oz)b
923  1,161  (21%) 1,006 886 14%
Kibali (45%)g
Gold produced (000s oz) 92  91  1% 364 366 (1%)
Cost of sales ($/oz) 1,163  1,088  7% 1,091 1,111 (2%)
Total cash costs ($/oz)b
616  617  0% 608 568 7%
All-in sustaining costs ($/oz)b
783  817  (4%) 778 693 12%
Veladero (50%)
Gold produced (000s oz) 58  44  32% 226 274  (18%) 278
Cost of sales ($/oz) 1,074  1,136  (5%) 1,151 1,188 (3%) 1,112
Total cash costs ($/oz)b
698  708  (1%) 748 734 2% 629
All-in sustaining costs ($/oz)b
1,428  1,159  23% 1,308 1,105 18% 1,154
Porgera (47.5%)h
Gold produced (000s oz) 86 284 (70%) 204
Cost of sales ($/oz) 1,225 994 23% 996
Total cash costs ($/oz)b
928 838 11% 796
All-in sustaining costs ($/oz)b
1,115 1,003 11% 1,083

BARRICK YEAR-END 2020
23
MANAGEMENT’S DISCUSSION AND ANALYSIS


Production and Cost Summary - Gold (continued)
For the three months ended For the years ended
12/31/20 9/30/20 Change 12/31/20 12/31/19  Change 12/31/18
Tongon (89.7%)g
Gold produced (000s oz) 66  64  3% 255 245 4%
Cost of sales ($/oz) 1,371  1,329  3% 1,334 1,469 (9%)
Total cash costs ($/oz)b
810  731  11% 747 787 (5%)
All-in sustaining costs ($/oz)b
853  777  10% 791 844 (6%)
Hemlo
Gold produced (000s oz) 57  55  4% 223 213 5% 171
Cost of sales ($/oz) 1,379  1,257  10% 1,256 1,137 10% 1,157
Total cash costs ($/oz)b
1,104  1,099  0% 1,056 904 17% 1,046
All-in sustaining costs ($/oz)b
1,464  1,497  (2%) 1,423 1,140 25% 1,318
North Marai
Gold produced (000s oz) 61  67  (9%) 261 251 4% 215
Cost of sales ($/oz) 1,073  903  19% 992 953 4% 795
Total cash costs ($/oz)b
799  649  23% 702 646 9% 603
All-in sustaining costs ($/oz)b
989  758  30% 929 802 16% 830
Buzwagii
Gold produced (000s oz) 21  21  0% 84 83 1% 93
Cost of sales ($/oz) 1,314  907  45% 1,021 1,240 (18%) 939
Total cash costs ($/oz)b
1,267  687  84% 859 1,156 (26%) 916
All-in sustaining costs ($/oz)b
1,283  693  85% 871 1,178 (26%) 947
Bulyanhului
Gold produced (000s oz) 23  229% 44 27 63% 26
Cost of sales ($/oz) 1,181  1,502  (21%) 1,499 1,207 24% 1,231
Total cash costs ($/oz)b
610  874  (30%) 832 676 23% 650
All-in sustaining costs ($/oz)b
664  913  (27%) 895 773 16% 754
Kalgoorlie (50%)j
Gold produced (000s oz) 206 (100%) 314
Cost of sales ($/oz) 1,062 (100%) 899
Total cash costs ($/oz)b
873 (100%) 732
All-in sustaining costs ($/oz)b
1,183 (100%) 857
Total Attributable to Barrickk
Gold produced (000s oz) 1,206  1,155  4% 4,760 5,465 (13%) 4,527
Cost of sales ($/oz)l
1,065  1,065  0% 1,056 1,005 5% 892
Total cash costs ($/oz)b
692  696  (1%) 699 671 4% 588
All-in sustaining costs ($/oz)b
929  966  (4%) 967 894 8% 806
a.Represents the combined results of Cortez, Goldstrike (including our 60% share of South Arturo) and our 75% interest in Turquoise Ridge until June 30, 2019. Commencing July 1, 2019, the date Nevada Gold Mines was
established, the results represent our 61.5% interest in Cortez, Carlin (including Goldstrike and 60% of South Arturo), Turquoise Ridge (including Twin Creeks), Phoenix and Long Canyon.
b.These are non-GAAP financial performance measures with no standardized meaning under IFRS and therefore may not be comparable to similar measures presented by other issuers. For further information and a detailed reconciliation of each non-GAAP measure used in this section of the MD&A to the most directly comparable IFRS measure, please see pages 96 to 122 of this MD&A.
c.On July 1, 2019, Barrick's Goldstrike and Newmont's Carlin were contributed to Nevada Gold Mines and are now referred to as Carlin. As a result, the amounts presented represent Goldstrike on a 100% basis (including our 60% share of South Arturo) up until June 30, 2019, and the combined results of Carlin and Goldstrike (including our 60% share of South Arturo) on a 61.5% basis thereafter.
d.On July 1, 2019, Cortez was contributed to Nevada Gold Mines, a joint venture with Newmont. As a result, the amounts presented are on a 100% basis up until June 30, 2019, and on a 61.5% basis thereafter.
e.Barrick owned 75% of Turquoise Ridge through to the end of the second quarter of 2019, with our joint venture partner, Newmont, owning the remaining 25%. Turquoise Ridge was proportionately consolidated on the basis that the joint venture partners that have joint control have rights to the assets and obligations for the liabilities relating to the arrangement. The figures presented in this table are based on our 75% interest in
Turquoise Ridge until June 30, 2019. On July 1, 2019, Barrick's 75% interest in Turquoise Ridge and Newmont's Twin Creeks and 25% interest in Turquoise Ridge were contributed to Nevada Gold Mines. Starting July 1, 2019, the results represent our 61.5% share of Turquoise Ridge and Twin Creeks, now referred to as Turquoise Ridge.
f.A 61.5% interest in these sites was acquired as a result of the formation of Nevada Gold Mines on July 1, 2019.
g.These sites did not form a part of the Barrick consolidated results in 2018 as these sites were acquired as a result of the Merger.
h.As Porgera was placed on care and maintenance on April 25, 2020, no operating data or per ounce data has been provided starting the third quarter of 2020.
i.Formerly part of Acacia Mining plc. On September 17, 2019, Barrick acquired all of the shares of Acacia it did not own. Operating results are included at 63.9% until September 30, 2019 (notwithstanding the completion of the Acacia transaction on September 17, 2019, we consolidated our interest in Acacia and recorded a non-controlling interest of 36.1% in the income statement for the entirety of the third quarter of 2019 as a matter of convenience), on a 100% basis from October 1, 2019, to December 31, 2019, and on an 84% basis thereafter as the GoT’s 16% free-carried interest was made effective from January 1, 2020.
j.On November 28, 2019, we completed the sale of our 50% interest in Kalgoorlie in Western Australia to Saracen Mineral Holdings Limited for total cash consideration of $750 million. Accordingly, the amounts presented represent our 50% interest until November 28, 2019.
k.Excludes Pierina, Golden Sunlight starting in the third quarter of 2019, Morila (40%) starting in the third quarter of 2019 up until its divestiture in November 2020, and Lagunas Norte starting in the fourth quarter of 2019. These assets are producing incidental ounces as they reach the end of their mine lives.
l.Cost of sales per ounce (Barrick’s share) is calculated as cost of sales - gold on an attributable basis (excluding sites in care and maintenance) divided by gold equity ounces sold.

BARRICK YEAR-END 2020
24
MANAGEMENT’S DISCUSSION AND ANALYSIS


Production and Cost Summary - Copper
For the three months ended For the years ended
12/31/20 9/30/20 Change 12/31/20 12/31/19  Change 12/31/18
Lumwana
Copper production (millions lbs) 78  62  26% 276 238  16% 224 
Cost of sales ($/lb) 1.96  2.06  (5%) 2.01 2.13  (6%) 2.51 
C1 cash costs ($/lb)a
1.58  1.49  6% 1.56 1.79  (13%) 2.08 
All-in sustaining costs ($/lb)a
2.60  2.58  1% 2.43 3.04  (20%) 3.08 
Zaldívar (50%)
Copper production (millions lbs) 23  24  (4%) 106 128  (17%) 104 
Cost of sales ($/lb) 2.68  2.20  22% 2.46 2.46  0% 2.55 
C1 cash costs ($/lb)a
2.01  1.64  23% 1.79 1.77  1% 1.97 
All-in sustaining costs ($/lb)a
2.70  2.27  19% 2.25 2.15  5% 2.47 
Jabal Sayid (50%)
Copper production (millions lbs) 18  17  6% 75 66  14% 55 
Cost of sales ($/lb) 1.53  1.43  7% 1.42 1.53  (7%) 1.73 
C1 cash costs ($/lb)a
1.15  1.14  1% 1.11 1.26  (12%) 1.53 
All-in sustaining costs ($/lb)a
1.27  1.17  9% 1.24 1.51  (18%) 1.92 
Total Copper
Copper production (millions lbs) 119  103  16% 457 432 6% 383 
Cost of sales ($/lb)b
2.06  1.97  5% 2.02 2.14 (6%) 2.40 
C1 cash costs ($/lb)a
1.61  1.45  11% 1.54 1.69 (9%) 1.97 
All-in sustaining costs ($/lb)a
2.42  2.31  5% 2.23 2.52 (12%) 2.82 

a.These are non-GAAP financial performance measures with no standardized meaning under IFRS and therefore may not be comparable to similar measures presented by other issuers. For further information and a detailed reconciliation of each non-GAAP measure used in this section of the MD&A to the most directly comparable IFRS measure, please see pages 96 to 122 of this MD&A.
b.Cost of sales per pound (Barrick’s share) is calculated as cost of sales - copper plus our equity share of cost of sales attributable to Zaldívar and Jabal Sayid divided by copper pounds sold.


Operating Divisions Performance

Review of Operating Divisions Performance
Our presentation of our reportable operating segments consists of 10 gold mines (Carlin, Cortez, Turquoise Ridge, Pueblo Viejo, Loulo-Gounkoto, Kibali, Veladero, Porgera, North Mara and Bulyanhulu). The remaining operating segments, including our copper mines, remaining gold mines and project, have been grouped into an “other” category and will not be reported on individually. Segment
performance is evaluated based on a number of measures including operating income before tax, production levels and unit production costs. Certain costs are managed on a consolidated basis and are therefore not reflected in segment income.



BARRICK YEAR-END 2020
25
MANAGEMENT’S DISCUSSION AND ANALYSIS


Nevada Gold Mines (61.5% basis)a, Nevada USA

Summary of Operating and Financial Data
For the three months ended  For the  years ended
  12/31/20 9/30/20 Change 12/31/20 12/31/19 Change 12/31/18
Total tonnes mined (000s) 57,603  56,896  1% 223,148  189,456  18% 182,204 
    Open pit ore 8,842  9,630  (8)% 36,305  26,942  35% 20,605 
    Open pit waste 47,472  45,974  3% 181,675  157,868  15% 157,960 
    Underground 1,289  1,292  0% 5,168  4,646  11% 3,639 
Average grade (grams/tonne)
    Open pit mined 1.02  1.39  (27)% 1.14  0.93  23% 2.96 
    Underground mined 9.39  9.65  (3)% 9.67  10.52  (8)% 10.96 
    Processed 2.05  2.13  (4)% 2.02  2.29  (12)% 3.47 
Ore tonnes processed (000s) 10,717  10,818  (1)% 43,174  36,724  18% 25,680 
    Oxide mill 3,220  3,244  (1)% 12,907  8,338  55% 4,527 
    Roaster 1,468  1,340  10% 5,222  5,377  (3)% 5,104 
    Autoclave 1,207  1,314  (8)% 5,418  5,656  (4)% 5,338 
    Heap leach 4,822  4,920  (2)% 19,627  17,353  13% 10,711 
Recovery rateb
79  % 79  % 0% 80  % 82  % (2)% 83  %
    Oxide Millb
73  % 74  % (1)% 73  % 76  % (4)% 83  %
    Roaster 86  % 86  % 0% 86  % 87  % (1)% 89  %
    Autoclave 69  % 68  % 2% 71  % 74  % (4)% 69  %
Gold produced (000s oz) 546  538  1% 2,131  2,218  (4)% 2,368 
    Oxide mill 83  72  15% 300  336  (11)% 590 
    Roaster 270  288  (6)% 1,070  1,070  0% 1,120 
    Autoclave 111  107  3% 468  547  (14)% 497 
    Heap leach 82  71  15% 293  265  11% 161 
Gold sold (000s oz) 542  542  0% 2,134  2,223  (4)% 2,359 
Revenue ($ millions) 1,032  1,063  (3)% 3,867  3,128  24% 2,986 
Cost of sales ($ millions) 542  571  (5)% 2,186  2,035  7% 1,921 
Income ($ millions) 482  481  0% 1,636  1,050  56% 1,011 
EBITDA ($ millions)c
634  633  0% 2,232  1,642  36% 1,688 
EBITDA margind
61  % 60  % 2% 58  % 52  % 10% 57  %
Capital expenditures ($ millions)e,f
126  153  (18)% 583  627  (7)% 626 
    Minesite sustaininge
95  118  (19)% 459  380  21% 272 
    Projecte
31  35  (11)% 124  247  (50)% 354 
Cost of sales ($/oz) 1,007  1,060  (5)% 1,029  924  11% 814 
Total cash costs ($/oz)c
667  723  (8)% 702  634  11% 526 
All-in sustaining costs ($/oz)c
873  956  (9)% 941  828  14% 664 
All-in costs ($/oz)c
925  1,025  (10)% 998  938  6% 814 
a.Represents the combined results of Cortez, Goldstrike (including our 60% share of South Arturo) and our 75% interest in Turquoise Ridge until June 30, 2019. Commencing July 1, 2019, the date Nevada Gold Mines was established, the results represent our 61.5% interest in Cortez, Carlin (including Goldstrike and 60% of South Arturo), Turquoise Ridge (including Twin Creeks), Phoenix and Long Canyon.
b.Excludes the Gold Quarry (Mill 5) concentrator.
c.These are non-GAAP financial performance measures with no standardized meaning under IFRS and therefore may not be comparable to similar measures presented by other issuers. For further information and a detailed reconciliation of each non-GAAP measure used in this section of the MD&A to the most directly comparable IFRS measure, please see pages 96 to 122 of this MD&A.
d.Represents EBITDA divided by revenue.
e.Presented on a cash basis as a result of adopting IFRS 16 Leases starting in 2019. Capital expenditures for 2018 are presented on an accrued basis.
f.Amounts presented exclude capitalized interest.

On July 1, 2019, Nevada Gold Mines (“NGM”) was established, which includes Barrick's Cortez, Goldstrike, Turquoise Ridge and Goldrush properties and Newmont Corporation’s (“Newmont”) Carlin, Twin Creeks, Phoenix, Long Canyon and Lone Tree properties. Barrick is the operator of the joint venture and owns 61.5%, with Newmont owning the remaining 38.5% of the joint venture. Refer to the following pages for a detailed discussion of
Cortez, Carlin (including Goldstrike) and Turquoise Ridge (including Twin Creeks) results.

Regulatory Matters
In a Special Session of the Nevada Legislature, which commenced on July 8, 2020, a bill was passed that temporarily requires the advance payment of the portion of the Net Proceeds of Minerals tax (“NPT”) that is distributed
BARRICK YEAR-END 2020
26
MANAGEMENT’S DISCUSSION AND ANALYSIS


to the State General Fund. This advance payment will be based upon the estimated NPT liability for 2021 with payment to be made on or before March 1, 2021, and will be in addition to the total payment related to 2020. This bill mirrors legislation introduced in 2009 following the Global Financial Crisis, and had been part of discussions between Nevada Gold Mines and the Governor of Nevada in the first half of 2020 on measures to support the State through the Covid-19 pandemic.
In a subsequent Special Session, which commenced on July 31, 2020, three resolutions were passed proposing amendments to the Nevada Constitution to modify provisions regarding the NPT. Two resolutions seek to eliminate the 5% cap on the NPT and replace it with a 7.75% rate on the gross proceeds from mining. The third resolution proposes to increase the cap on the NPT from 5% to 12%. All three resolutions would significantly impact the long-term viability of the Nevada mining industry. These resolutions require further approvals, including a statewide vote to become law. If any of those resolutions were to ultimately result in an amendment of the Nevada
Constitution, a potentially multi-year process, it could significantly increase the State taxes payable by NGM, which would negatively impact future cash flows.
A number of the rural Nevada counties and NGM filed lawsuits in the Nevada District Court, challenging the constitutionality of these resolutions. These lawsuits were subsequently consolidated into one. On January 27, 2021, the Nevada District Court granted a summary judgment in favor of the Nevada Legislature, concluding that the matter is not yet ripe for adjudication. Nevada Gold Mines intends to appeal the decision to the Nevada Supreme Court and may renew its challenge following the upcoming legislative session should the resolutions pass a second legislative approval. Separately, Nevada Gold Mines and the Nevada Mining Association are committed to and engaged in constructive discussions with the Governor, the Legislature and other affected stakeholders seeking to reach a solution that secures the mining industry’s ability to continue supporting the rural counties and the State of Nevada for the long term.    

BARRICK YEAR-END 2020
27
MANAGEMENT’S DISCUSSION AND ANALYSIS


Carlin (61.5% basis)a, Nevada USA

Summary of Operating and Financial Data
For the three months ended For the years ended
   12/31/20 9/30/20 Change 12/31/20 12/31/19 Change 12/31/18
Total tonnes mined (000s) 19,761  20,147  (2)% 72,820  49,343  48% 59,605 
Open pit ore 919  2,092  (56)% 6,054  4,773  27% 4,626 
Open pit waste 18,038  17,234  5% 63,579  41,978  51% 53,387 
Underground 804  821  (2)% 3,187  2,592  23% 1,592 
Average grade (grams/tonne)
Open pit mined 1.42  2.62  (46)% 2.08  2.08  0% 3.75 
Underground mined 8.78  9.65  (9)% 9.36  9.09  3% 9.39 
Processed 3.82  3.93  (3)% 3.69  3.80  (3)% 4.32 
Ore tonnes processed (000s) 3,053  3,078  (1)% 12,195  10,467  17% 8,075 
Oxide mill 785  718  9% 2,936  1,368  115% n/a
Roaster 1,143  962  19% 3,743  3,627  3% 3,341 
Autoclave 595  724  (18)% 3,071  4,169  (26)% 4,734 
Heap leach 530  674  (21)% 2,445  1,303  88% n/a
Recovery rateb
79  % 78  % 1% 79  % 75  % 5% 74  %
Roaster 87  % 86  % 2% 86  % 86  % 0% 89  %
Autoclave 48  % 49  % (1)% 57  % 59  % (4)% 53  %
Gold produced (000s oz) 260  276  (6)% 1,024  968  6% 835 
Oxide mill 9  12  (24)% 38  25  52% n/a
Roaster 214  219  (2)% 784  694  13% 606 
Autoclave 27  36  (25)% 161  225  (28)% 229 
Heap leach 10  11% 41  24  71% n/a
Gold sold (000s oz) 259  275  (6)% 1,024  967  6% 842 
Revenue ($ millions) 479  524  (9)% 1,812  1,355  34% 1,066 
Cost of sales ($ millions) 237  271  (13)% 999  971  3% 886 
Income ($ millions) 244  247  (1)% 795  370  115% 166 
EBITDA ($ millions)c
289  297  (3)% 983  609  61% 428 
EBITDA margind
60  % 57  % 6% 54  % 45  % 21% 40  %
Capital expenditures ($ millions)e,f
57  59  (3)% 231  211  9% 186 
    Minesite sustaininge
57  59  (3)% 231  211  9% 186 
    Projecte
0  0% 0  0%
Cost of sales ($/oz) 917  985  (7)% 976  1,004  (3)% 1,054 
Total cash costs ($/oz)c
740  800  (8)% 790  746  6% 740 
All-in sustaining costs ($/oz)c
1,005  1,036  (3)% 1,041  984  6% 983 
All-in costs ($/oz)c
1,005  1,036  (3)% 1,041  984  6% 983 
a.On July 1, 2019, Barrick's Goldstrike and Newmont's Carlin were contributed to Nevada Gold Mines and are now collectively referred to as Carlin. As a result, the amounts presented represent Goldstrike on a 100% basis (including our 60% share of South Arturo) up until June 30, 2019, and the combined results of Carlin and Goldstrike (including NGM’s 60% share of South Arturo) on a 61.5% basis thereafter.
b.Excludes the Gold Quarry (Mill 5) concentrator.
c.These are non-GAAP financial performance measures with no standardized meaning under IFRS and therefore may not be comparable to similar measures presented by other issuers. For further information and a detailed reconciliation of each non-GAAP measure used in this section of the MD&A to the most directly comparable IFRS measure, please see pages 96 to 122 of this MD&A.
d.Represents EBITDA divided by revenue.
e.Presented on a cash basis as a result of adopting IFRS 16 Leases starting in 2019. Capital expenditures for 2018 are presented on an accrued basis.
f.Amounts presented exclude capitalized interest.

On July 1, 2019, Barrick's Goldstrike operations and Newmont's Carlin operations were contributed to Nevada Gold Mines and are now collectively referred to as Carlin. As a result, the amounts presented represent Goldstrike on a 100% basis (including our 60% share of South Arturo) up until June 30, 2019, and the combined results of Carlin and Goldstrike (including our 60% share of South Arturo) on a 61.5% basis thereafter. As a result of this transaction, there is now a higher proportion of open pit ore mined and, consequently, the average grade processed is lower, which
also aligns with the inclusion of a heap leach facility contributed by Newmont.

Safety and Environment
There was one LTI recorded at Carlin during the fourth quarter of 2020, which resulted in an LTIFR6 of 0.45 per million hours worked, compared to 2.06 in the prior quarter. There were ten LTIs recorded in 2020, which resulted in an LTIFR6 of 1.06 per million hours worked, compared to 1.51
BARRICK YEAR-END 2020
28
MANAGEMENT’S DISCUSSION AND ANALYSIS


in 2019. No Class 17 environmental incidents occurred during 2020 or 2019.

Financial Results
Q4 2020 compared to Q3 2020
Carlin's income for the fourth quarter of 2020 decreased by 1% primarily due to a lower realized gold price4 and lower sales volumes resulting from lower grade ore mined and processed. These impacts were largely offset by a lower cost of sales per ounce5.
Gold production in the fourth quarter of 2020 was 6% lower compared to the prior quarter driven by lower production from the autoclave, roasters, and oxide mill. The largest impact was from the Goldstrike autoclave which completed processing of acidic ores at the end of the third quarter, and converted to the treatment of alkaline ores in the fourth quarter, resulting in lower throughput rates and gold production. Open pit ore tonnes were impacted quarter-on-quarter as Goldstrike completed mining of the 4th NW layback of the Betze-Post pit, as well as from continued stripping of the 5th NW layback. Underground mined grade was down 9% relative to the prior quarter due to mine sequencing.
Cost of sales per ounce5 and total cash costs per ounce4 in the fourth quarter of 2020 were 7% and 8% lower, respectively, than the prior quarter mainly due to a higher proportion of lower cost stockpiled ore in the feed mix. In the fourth quarter of 2020, all-in sustaining costs per ounce4 decreased by 3% compared to the prior quarter, primarily due to lower total cash costs per ounce4 partially offset by higher minesite sustaining capital expenditures on a per ounce basis.
Capital expenditures in the fourth quarter of 2020 were in line with the prior quarter.

2020 compared to 2019
Carlin's income for 2020 and for the second half of 2019 reflects our 61.5% interest in Nevada Gold Mines and is inclusive of income from Newmont’s former Carlin operations and the Goldstrike operations from July 1, 2019. Income for Carlin for the first six months of 2019 represents Barrick’s 100% interest in the Goldstrike operations (including the 60% interest in South Arturo) prior to the formation of Nevada Gold Mines. In addition to this impact, the primary driver of the 115% increase in Carlin’s income compared to 2019 was the higher realized gold price4.

INCOME AND EBITDA4,a

carlinincome1.jpg

a The results represent Goldstrike on a 100% basis (including our 60% share of South Arturo) from January 1, 2018 to June 30, 2019 and on the combined results of Carlin and Goldstrike (including our 60% share of South Arturo) on a 61.5% basis from July 1, 2019 onwards.

Gold production for 2020 was 6% higher compared to the prior year, primarily due to the inclusion of Newmont’s former Carlin operations from July 1, 2019. This was partially offset by the reduction in Barrick's interest in Goldstrike (including the 60% interest in South Arturo) from 100% to 61.5% from July 1, 2019.

PRODUCTIONa (thousands of ounces)

carlinproduction1.jpg
a The results represent Goldstrike (including our 60% share of South Arturo) on a 100% basis from January 1, 2019 to June 30, 2019 and the combined results of Carlin and Goldstrike (including our 60% share of South Arturo) on a 61.5% basis from July 1, 2019 onwards.

Cost of sales per ounce5 was 3% lower than the prior year due to lower depreciation, primarily driven by extended asset lives based on the latest life of mine plan, and partially offset by higher total cash costs per ounce4. Total cash costs per ounce4 were 6% higher than the prior year mainly due to the change in the sales mix by processing facility as a result of the formation of Nevada Gold Mines. This has resulted in an overall lower grade ore processed, partially offset by higher volumes through the addition of Newmont’s former Carlin operations to the Goldstrike operations. In addition, royalty expense was higher due to a higher realized gold price4. All-in sustaining costs per ounce4 were 6% higher than the prior year, primarily due to the impact of higher total cash costs per ounce4 combined with higher minesite sustaining capital expenditures.

COST OF SALES5, TOTAL CASH COSTS4
AND ALL-IN SUSTAINING COSTS4 ($ per ounce)

carlinaisc1.jpg

Capital expenditures for 2020 increased by 9% from the prior year due to higher minesite sustaining capital expenditures. Higher minesite sustaining capital expenditures are attributed to the inclusion of Newmont's former Carlin operations, partially offset by the reduction in Barrick's interest in Goldstrike (including the 60% interest in South Arturo) from 100% to 61.5% from July 1, 2019.

BARRICK YEAR-END 2020
29
MANAGEMENT’S DISCUSSION AND ANALYSIS


2020 compared to Guidance
Gold production for 2020 of 1,024 thousand ounces was within the guidance range of 1,000 to 1,050 thousand ounces. Cost of sales per ounce5 of $976 was slightly higher than the guidance range of $920 to $970 per ounce. Cost of sales per ounce5 would have been within guidance after adjusting for the impact of the higher realized gold price4 on royalty expense as 2020 guidance was based on a gold price assumption of $1,350 per ounce. Total cash costs per ounce4 and all-in sustaining costs per ounce4 of $790 and $1,041, respectively, were within the guidance ranges of $760 to $810 per ounce, and $1,000 to $1,050 per ounce, respectively. These per ounce costs would have been at the lower end of the guidance range after adjusting for the impact of the higher realized gold price4 on royalty expense as described above.
BARRICK YEAR-END 2020
30
MANAGEMENT’S DISCUSSION AND ANALYSIS


Cortez (61.5% basis)a, Nevada USA

Summary of Operating and Financial Data
For the three months ended For the years ended
   12/31/20 9/30/20 Change 12/31/20 12/31/19 Change 12/31/18
Total tonnes mined (000s) 21,831  20,494  7% 85,740  105,949  (19)% 121,929 
    Open pit ore 2,278  2,755  (17)% 11,392  14,640  (22)% 15,979 
    Open pit waste 19,280  17,480  10% 73,240  90,029  (19)% 104,573 
    Underground 273  259  5% 1,108  1,280  (13)% 1,377 
Average grade (grams/tonne)
    Open pit mined 0.95  0.47  103% 0.56  0.67  (17)% 2.73 
    Underground mined 8.92  9.44  (5)% 9.86  10.66  (7)% 10.73 
    Processed 1.75  1.34  30% 1.41  1.60  (12)% 2.67 
Ore tonnes processed (000s) 2,553  3,301  (23)% 13,019  17,583  (26)% 17,001 
    Oxide mill 558  590  (5)% 2,432  3,462  (30)% 4,527 
    Roaster 325  378  (14)% 1,479  1,750  (15)% 1,763 
    Heap leach 1,670  2,333  (28)% 9,108  12,371  (26)% 10,711 
Recovery rate 81  % 82  % (1)% 83  % 86  % (3)% 87  %
    Oxide Mill 77  % 73  % 5% 75  % 78  % (4)% 83  %
    Roaster 85  % 86  % (1)% 87  % 87  % 0% 91  %
Gold produced (000s oz) 118  113  4% 491  801  (39)% 1,265 
    Oxide mill 45  28  61% 129  253  (49)% 590 
    Roaster 56  69  (19)% 286  376  (24)% 514 
    Heap leach 17  16  4% 76  172  (56)% 161 
Gold sold (000s oz) 116  115  1% 491  798  (38)% 1,255 
Revenue ($ millions) 216  220  (2)% 865  1,086  (20)% 1,589 
Cost of sales ($ millions) 121  122  (1)% 470  608  (23)% 828 
Income ($ millions) 92  96  (4)% 386  459  (16)% 726 
EBITDA ($ millions)b
127  129  (2)% 522  656  (20)% 1,112 
EBITDA marginc
59  % 59  % 0% 60  % 60  % 0% 70  %
Capital expenditures ($ millions)d,e
23  52  (56)% 177  255  (31)% 340 
    Minesite sustainingd
18  39  (54)% 145  90  62% 65 
    Projectd
5  13  (62)% 32  165  (81)% 275 
Cost of sales ($/oz) 1,043  1,060  (2)% 957  762  26% 659 
Total cash costs ($/oz)b
738  763  (3)% 678  515  32% 351 
All-in sustaining costs ($/oz)b
906  1,133  (20)% 998  651  53% 430 
All-in costs ($/oz)b
948  1,236  (23)% 1,062  854  24% 649 
a.On July 1, 2019, Cortez was contributed to Nevada Gold Mines, a joint venture with Newmont. As a result, the amounts presented are on a 100% basis up until June 30, 2019, and on a 61.5% basis thereafter.
b. These are non-GAAP financial performance measures with no standardized meaning under IFRS and therefore may not be comparable to similar measures presented by other issuers. For further information and a detailed reconciliation of each non-GAAP measure used in this section of the MD&A to the most directly comparable IFRS measure, please see pages 96 to 122 of this MD&A.
c.Represents EBITDA divided by revenue.
d.Presented on a cash basis as a result of adopting IFRS 16 Leases starting in 2019. Capital expenditures for 2018 are presented on an accrued basis.
e.Amounts presented exclude capitalized interest.

On July 1, 2019, Barrick's Cortez operations were contributed to Nevada Gold Mines, a joint venture with Newmont. As a result, the amounts presented represent Cortez on a 100% basis up until June 30, 2019 and on a 61.5% basis thereafter.

Safety and Environment
There were no LTIs recorded at Cortez during the fourth quarter of 2020, which resulted in an LTIFR6 of 0.00 per million hours worked, consistent with the prior quarter. There was one LTI recorded in 2020, which resulted in an LTIFR6 of 0.24 per million hours worked, compared to 0.47 in 2019. No Class 17 environmental incidents occurred during 2020 or 2019.

Financial Results
Q4 2020 compared to Q3 2020
Cortez’s income for the fourth quarter of 2020 was 4% lower than the prior quarter primarily due to a lower realized gold price4, partially offset by lower cost of sales per ounce5 and slightly higher sales volume resulting from higher gold production.
Gold production in the fourth quarter of 2020 was 4% higher compared to the prior quarter, primarily driven by an increase in oxide mill production due to higher open pit grades, a higher proportion of underground ore processed and higher recoveries. This was partially offset by lower throughput across all processing facilities. Gold production from the roasters was lower due to a decrease in trucking of open pit stockpiles to Carlin and marginally lower grades
BARRICK YEAR-END 2020
31
MANAGEMENT’S DISCUSSION AND ANALYSIS


from Cortez Hills Underground (“CHUG”). Higher open pit waste mined quarter-on-quarter was a result of re-sequencing due to a geotechnical event in the Pipeline pit at the end of the third quarter of 2020.
Cost of sales per ounce5 and total cash costs per ounce4 in the fourth quarter of 2020 were 2% and 3% lower, respectively, versus the prior quarter primarily due to a change in refractory ore routing and the consequent impact on sales mix by processing facility. In the fourth quarter of 2020, all-in sustaining costs per ounce4 decreased by 20% compared to the prior quarter due to lower minesite sustaining capital expenditure together with lower total cash costs per ounce4.
Capital expenditures in the fourth quarter of 2020 decreased by 56% compared to the prior quarter due to lower minesite sustaining capital expenditures and lower project capital expenditures. Minesite sustaining capital expenditures were lower primarily due to fewer haul truck component replacements, the ramp-down of the Crossroads dewatering project until the next stages are reviewed and approved, and a reduction in capitalized stripping as the mine transitions out from a mostly stripping phase at Crossroads Phase 4. The lower project capital expenditures relative to the third quarter of 2020 were due to the commissioning of the CHUG Rangefront decline project in the current quarter.

2020 compared to 2019
Cortez’s income for 2020 and the second half of 2019 reflects our 61.5% ownership interest following the formation of Nevada Gold Mines as described above. Income from Cortez for the first half of 2019 represents Barrick's 100% share of the Cortez operations prior to the formation of Nevada Gold Mines. In addition to this impact, the 16% decrease in Cortez's income was also due to a decrease in sales volume reflecting lower gold production and higher cost of sales per ounce5, partially offset by a higher realized gold price4.

INCOME AND EBITDA4,a

cortezincome1.jpg

a The results are on a 100% basis from January 1, 2018 to June 30, 2019 and on a 61.5% basis from July 1, 2019 onwards.

Gold production for 2020 was 39% lower, primarily due to the reduction in Barrick's interest in Cortez from July 1, 2019, combined with lower grades mined and processed from Cortez Hills Open Pit (“CHOP”) as mining was completed in the second quarter of 2019. This impact has been partially offset by the ability to route underground ore and stockpiled open pit ore from Cortez through the Gold Quarry (Mill 6) roaster at Carlin, which was a synergy unlocked by the creation of Nevada Gold Mines.

PRODUCTIONa (thousands of ounces)

cortezproduction1.jpg
a The results are on a 100% basis from January 1, 2019 to June 30, 2019 and on a 61.5% basis from July 1, 2019 onwards.

Cost of sales per ounce5 for 2020 increased by 26% due to higher total cash costs per ounce4, marginally offset by lower depreciation expense per ounce as CHOP had higher depreciation expense on a per ounce basis relative to other ore mined at Cortez. Total cash costs per ounce4 was 32% higher than the prior year mainly due to the impact of lower grades as mining from the higher grade CHOP was completed in the second quarter of 2019, combined with increased royalty expense and higher haulage costs associated with the tonnes routed to the Gold Quarry (Mill 6) roaster. Royalty expense has increased as production has shifted from CHOP to Crossroads, which carries a higher royalty rate. In addition, the higher realized gold price4 has impacted royalty expense. For 2020, all-in sustaining costs per ounce4 increased by 53% compared to 2019, due to higher total cash costs per ounce4 and increased minesite sustaining capital expenditures from Crossroads capitalized stripping (treated as project capital expenditures in the prior year period).

COST OF SALES5, TOTAL CASH COSTS4
AND ALL-IN SUSTAINING COSTS4 ($ per ounce)

cortezaisc1.jpg

Capital expenditures for 2020 were 31% lower than the prior year due to the reduction in Barrick's interest in Cortez from 100% to 61.5% from July 1, 2019. In addition, the lower project capital expenditures were due to the commissioning of the CHUG Rangefront decline project in the fourth quarter of 2020, as well as the ramp-down of Deep South and Crossroads dewatering project expenditures. Sustaining capital increased over the prior year due to Crossroads capitalized stripping (whereas it was treated as project capital expenditures up to the third quarter of 2019), increased spending on water management and additional mining equipment for CHOP buttress work.


BARRICK YEAR-END 2020
32
MANAGEMENT’S DISCUSSION AND ANALYSIS


2020 compared to Guidance
Gold production for 2020 of 491 thousand ounces was above the guidance range of 450 to 480 thousand ounces, as higher grade ore from Cortez was processed by the Carlin roasters, which displaced lower grade Carlin open pit ore in the feed mix. Cost of sales per ounce5 for 2020 was $957, which was below the guidance range of $980 to $1,030 per ounce. Total cash costs per ounce4 of $678 were within the guidance range of $640 to $690 per ounce, whereas all-in sustaining costs per ounce4 of $998 were higher than guidance of $910 to $960 per ounce due to the higher sustaining capital expenditures.
BARRICK YEAR-END 2020
33
MANAGEMENT’S DISCUSSION AND ANALYSIS


Turquoise Ridge (61.5%)a, Nevada USA

Summary of Operating and Financial Data
For the three months ended For the years ended
12/31/20 9/30/20 Change 12/31/20 12/31/19 Change 12/31/18
Total tonnes mined (000s) 3,880  3,988  (3)% 15,483  9,001  72% 670 
Open pit ore 1,447  1,601  (10)% 5,150  1,340  284% n/a
Open pit waste 2,221  2,175  2% 9,460  6,887  37% n/a
Underground 212  212  0% 873  774  13% 670 
Average grade (grams/tonne)
Open pit mined 2.21  2.19  1% 2.24  1.37  64% n/a
Underground mined 11.94  9.89  21% 10.44  14.44  (28)% 15.00 
Processed 3.47  3.29  5% 3.42  5.62  (39)% 14.79 
Ore tonnes processed (000s) 964  968  0% 3,613  2,201  64% 604 
Oxide Mill 120  111  8% 458  221  107% n/a
Autoclave 612  590  4% 2,346  1,483  58% 604 
Heap leach 232  267  (13)% 809  497  63% n/a
Recovery Rate 82  % 82  % 0% 83  % 89  % (7)% 93  %
Oxide Mill 86  % 92  % (7)% 88  % 87  % 1% n/a
Autoclave 82  % 81  % 1% 83  % 89  % (7)% 93  %
Gold produced (000s oz) 91  76  20% 330  335  (2)% 268 
Oxide Mill 5  25% 16  100% n/a
Autoclave 84  71  19% 306  321  (5)% 268 
Heap leach 2  100% 8  31% n/a
Gold sold (000s oz) 90  76  18% 332  356  (7)% 262 
Revenue ($ millions) 168  148  14% 589  504  17% 331 
Cost of sales ($ millions) 95  84  13% 353  300  18% 206 
Income ($ millions) 72  62  16% 229  201  14% 126 
EBITDA ($ millions)b
104  87  20% 342  293  17% 154 
EBITDA marginc
62  % 59  % 5% 58  % 58  % 0% 47  %
Capital expenditures ($ millions)d
10  13  (23)% 51  85  (40)% 62 
    Minesite sustainingd
6  50% 24  50  (52)% 20 
    Projectd
4  (56)% 27  35  (23)% 42 
Cost of sales ($/oz) 1,064  1,097  (3)% 1,064  846  26% 783 
Total cash costs ($/oz)b
687  745  (8)% 711  585  22% 678 
All-in sustaining costs ($/oz)b
757  805  (6)% 798  732  9% 756 
All-in costs ($/oz)b
799  929  (14)% 879  834  5% 916 
a.Prior to July 1, 2019, Barrick owned 75% of Turquoise Ridge with our joint venture partner, Newmont, owning the remaining 25%. Turquoise Ridge was proportionately consolidated on the basis that the joint venture partners that have joint control have rights to the assets and obligations for the liabilities relating to the arrangement. The figures presented in this table are based on our 75% interest in Turquoise Ridge until June 30, 2019. On July 1, 2019, Barrick's 75% interest in Turquoise Ridge and Newmont's 100% interest in Twin Creeks and 25% interest in Turquoise Ridge were contributed to Nevada Gold Mines. Starting July 1, 2019, the results represent our 61.5% share of Turquoise Ridge and Twin Creeks, now collectively referred to as Turquoise Ridge.
b.These are non-GAAP financial performance measures with no standardized meaning under IFRS and therefore may not be comparable to similar measures presented by other issuers. For further information and a detailed reconciliation of each non-GAAP measure used in this section of the MD&A to the most directly comparable IFRS measure, please see pages 96 to 122 of this MD&A.
c. Represents EBITDA divided by revenue.
d.Presented on a cash basis as a result of adopting IFRS 16 Leases starting in 2019. Capital expenditures for 2018 are presented on an accrued basis.

Barrick owned 75% of Turquoise Ridge through to the end of the second quarter of 2019, with our joint venture partner, Newmont, owning the remaining 25%. The figures presented in this table are based on our 75% interest in Turquoise Ridge until June 30, 2019. On July 1, 2019, Barrick's 75% interest in Turquoise Ridge and Newmont's Twin Creeks and 25% interest in Turquoise Ridge were contributed to Nevada Gold Mines. Starting July 1, 2019, our results represent our 61.5% share of Turquoise Ridge and Twin Creeks, now referred to as Turquoise Ridge. As a result of this transaction, from July 1, 2019, Turquoise Ridge includes the Twin Creeks open pit operations, resulting in considerably higher tonnes mined at a lower
average grade of ore processed. It also includes the Twin Creeks processing operations and heap leach facility contributed by Newmont.

Safety and Environment
There were four LTIs recorded at Turquoise Ridge during the fourth quarter of 2020, which resulted in an LTIFR6 of 5.54 per million hours worked, compared to 1.49 in the prior quarter. There were seven LTIs recorded in 2020, which resulted in an LTIFR6 of 2.51 per million hours worked, compared to 1.65 in 2019. No Class 17 environmental incidents occurred during 2020 or 2019.

BARRICK YEAR-END 2020
34
MANAGEMENT’S DISCUSSION AND ANALYSIS


Financial Results
Q4 2020 compared to Q3 2020
Turquoise Ridge's income for the fourth quarter of 2020 increased by 16% mainly due to higher sales volumes reflecting higher production in conjunction with lower cost of sales per ounce5. These impacts were partially offset by a lower realized gold price4.
Gold production in the fourth quarter of 2020 was 20% higher than the prior quarter, driven by the performance improvement at Turquoise Ridge underground from improved equipment availability and utilization. This improvement in the underground resulted in both higher throughput and feed grades at the autoclave.
Cost of sales per ounce5 and total cash costs per ounce4 in the fourth quarter of 2020 were 3% and 8% lower, respectively, compared to the prior quarter mainly due to higher sales driven by higher production. All-in sustaining costs per ounce4 decreased by 6% compared to the prior quarter, primarily reflecting lower total cash costs per ounce4 partially offset by higher minesite sustaining capital expenditures on a per ounce basis.
Capital expenditures in the fourth quarter of 2020 decreased by 23% compared to the prior quarter primarily due to lower project capital expenditure on the Third Shaft project.

2020 compared to 2019
Turquoise Ridge’s income for 2020 and the second half of 2019 reflects our 61.5% interest in Nevada Gold Mines and is inclusive of income from Newmont’s former Twin Creeks operations and the Turquoise Ridge operations from July 1, 2019. Income for Turquoise Ridge for the first six months of 2019 represents Barrick’s 75% interest in the Turquoise Ridge operations prior to the formation of Nevada Gold Mines. In addition to this impact, the Turquoise Ridge assets have been restated to fair market value as a consequence of the formation of NGM, which has resulted in a higher depreciation expense from July 1, 2019 onwards. Notwithstanding this change in Barrick’s ownership interest and the higher depreciation expense, Turquoise Ridge’s income for 2020 was 14% higher than the prior year, driven by a higher realized gold price4.

INCOME AND EBITDA4,a

trincome1.jpg
a The results represent Turquoise Ridge on a 75% basis from January 1, 2018 to June 30, 2019 and the combined results of Turquoise Ridge and Twin Creeks on a 61.5% basis from July 1, 2019 onwards.

Gold production for 2020 was 2% lower compared to the prior year, primarily due to the reduction in Barrick’s ownership interest in Turquoise Ridge partially offset by the inclusion of Newmont’s former Twin Creeks operations from July 1, 2019.


PRODUCTIONa (thousands of ounces)

trproduction1.jpg
a The results represent Turquoise Ridge on a 75% basis from January 1, 2019 to June 30, 2019 and the combined results of Turquoise Ridge and Twin Creeks on a 61.5% basis from July 1, 2019 onwards.

Cost of sales per ounce5 in 2020 was 26% higher than the prior year mainly reflecting the higher total cash costs per ounce4 and the higher depreciation expense resulting from the remeasurement of assets to fair value upon the formation of Nevada Gold Mines as described above. Total cash costs per ounce4 was 22% higher than the prior year, primarily due to the impact of lower grades processed and lower recovery. In 2020, all-in sustaining costs per ounce4 increased by 9% compared to the prior year due to higher total cash costs per ounce4, partially offset by lower minesite sustaining capital expenditures.

COST OF SALES5, TOTAL CASH COSTS4
AND ALL-IN SUSTAINING COSTS4 ($ per ounce)

traisc1.jpg

In 2020, capital expenditures decreased by 40% compared to the prior year. The decrease was due to lower minesite sustaining capital as well as lower project capital expenditure as work on the Third Shaft project is currently focused on shaft sinking activities with surface infrastructure now largely in place.

2020 compared to Guidance
As expected and previously disclosed, gold production in 2020 of 330 thousand ounces was below the guidance range of 430 to 460 thousand ounces. This was mainly due to lower than planned underground equipment availability and utilization, as well as lower plant availability. Cost of sales per ounce5 and total cash costs per ounce4 of $1,064 and $711, respectively, were above the guidance ranges of $900 to $950 per ounce and $540 to $590 per ounce, respectively, mainly due to the impact of lower sales volumes driven by lower production. All-in sustaining costs per ounce4 of $798 was above the guidance range of $690 to $740 per ounce for similar reasons.
BARRICK YEAR-END 2020
35
MANAGEMENT’S DISCUSSION AND ANALYSIS


Other Mines - Nevada Gold Mines

Summary of Operating and Financial Data
For the three months ended
12/31/20 9/30/20
Gold produced (000s oz) Cost of sales
($/oz)
Total cash costs
($/oz)
a
All-in sustaining costs
($/oz)
a
Capital Expend-ituresb
Gold produced (000s oz) Cost of sales
($/oz)
Total cash costs
($/oz)a
All-in sustaining costs
($/oz)a
Capital Expend-ituresb
Phoenix (61.5%) 26 2,054  590  670  2  30 1,773  520  659 
Long Canyon (61.5%) 51 674  145  324  7  43 877  212  384 
a.These are non-GAAP financial performance measures with no standardized meaning under IFRS and therefore may not be comparable to similar measures presented by other issuers. For further information and a detailed reconciliation of each non-GAAP measure used in this section of the MD&A to the most directly comparable IFRS measure, please see pages 96 to 122 of this MD&A.
b. Includes both minesite sustaining and project capital expenditures.

Phoenix (61.5%)
Gold production in the fourth quarter of 2020 for Phoenix was 13% lower compared to the prior quarter, primarily due to lower grades processed and lower mill recoveries. Cost of sales per ounce5 in the fourth quarter of 2020 was 16% higher than the prior quarter, primarily due to lower grades and recoveries. In the fourth quarter of 2020, all-in sustaining costs per ounce4 increased by 2% compared to the prior quarter primarily due to the drivers described above, although this was largely offset by higher copper by-product credits and lower minesite sustaining capital expenditures. Minesite sustaining capital expenditures decreased in the fourth quarter of 2020 due to less capitalized stripping, partially offset by additional tailings dam construction.
Compared to our outlook, gold production of 126 thousand ounces in 2020 was slightly higher than the guidance range of 100 to 120 thousand ounces. Cost of sales per ounce5 of $1,772 was below the guidance range of $1,850 to $1,900 per ounce. Total cash costs per ounce4 and all-in sustaining costs per ounce4 of $649 and $814, respectively, was also below the guidance ranges of $700 to $750 per ounce and $920 to $970 per ounce, respectively.



Long Canyon (61.5%)
Gold production for Long Canyon in the fourth quarter of 2020 was 19% higher compared to the third quarter of 2020, primarily due to a continued focus on leach cycle, carbon, and process solution management to draw down pad inventory. Cost of sales per ounce5 in the fourth quarter of 2020 was 23% lower than the prior quarter, mainly due to higher sales volumes driven by higher production as well as higher capitalized stripping, in line with the mining sequence. All-in sustaining costs per ounce4 decreased by 16% compared to the prior quarter, primarily due to the same drivers described above, partially offset by increased capitalized stripping. Minesite sustaining capital expenditures increased in the fourth quarter of 2020 due to an increase in capitalized waste mined from Cut 9 of the open pit.
Permitting activities for the mine life extension have been temporarily paused. A review seeking to optimize the project, including water management, was initiated during the second quarter of 2020 and remains ongoing.
Gold production in 2020 of 160 thousand ounces was above the guidance range of 130 to 150 thousand ounces. Cost of sales per ounce5 of $869 was below the guidance range of $910 to $960 per ounce. Total cash costs per ounce4 and all-in sustaining costs per ounce4 of $236 and $405, respectively, were also below the guidance ranges of $240 to $290 per ounce and $450 to $500 per ounce, respectively.


















BARRICK YEAR-END 2020
36
MANAGEMENT’S DISCUSSION AND ANALYSIS


Pueblo Viejo (60% basis)a, Dominican Republic

Summary of Operating and Financial Data
For the three months ended For the years ended
  12/31/20 9/30/20 Change 12/31/20 12/31/19 Change 12/31/18
Open pit tonnes mined (000s) 6,248  5,328  17% 20,262  24,732  (18)% 24,063 
Open pit ore 2,274  1,777  28% 6,147  8,085  (24)% 9,418 
Open pit waste 3,974  3,551  12% 14,115  16,647  (15)% 14,645 
Average grade (grams/tonne)
Open pit mined 2.68  2.61  3% 2.57  2.76  (7)% 2.78 
Processed 3.91  3.60  9% 3.61  3.91  (8)% 4.04 
Autoclave ore tonnes processed (000s) 1,456  1,281  14% 5,297  5,164  3% 5,008 
Recovery Rate 87  % 89  % (2)% 89  % 89  % 0% 89  %
Gold produced (000s oz) 159  129  23% 542  590  (8)% 581 
Gold sold (000s oz) 153  129  19% 541  584  (7)% 590 
Revenue ($ millions) 291  246  18% 954  843  13% 798 
Cost of sales ($ millions) 122  102  20% 443  435  2% 443 
Income ($ millions) 167  147  14% 508  402  26% 342 
EBITDA ($ millions)b
204  181  13% 644  522  23% 457 
EBITDA marginc
70  % 74  % (5)% 68  % 62  % 9% 57  %
Capital expenditures ($ millions)d
66  30  120% 134  64  109% 87 
    Minesite sustainingd
27  20  35% 79  64  23% 87 
    Projectd
39  10  290% 55  100%
Cost of sales ($/oz) 803  791  2% 819  747  10% 750 
Total cash costs ($/oz)b
493  450  9% 504  471  7% 465 
All-in sustaining costs ($/oz)b
689  609  13% 660  592  12% 623 
All-in costs ($/oz)b
941  697  35% 761  600  27% 623 
a.Pueblo Viejo is accounted for as a subsidiary with a 40% non-controlling interest. The results in the table and the discussion that follows are based on our 60% share only.
b.These are non-GAAP financial performance measures with no standardized meaning under IFRS and therefore may not be comparable to similar measures presented by other issuers. For further information and a detailed reconciliation of each non-GAAP measure used in this section of the MD&A to the most directly comparable IFRS measure, please see pages 96 to 122 of this MD&A.
c.Represents EBITDA divided by revenue.
d.Presented on a cash basis as a result of adopting IFRS 16 Leases starting in 2019. Capital expenditures for 2018 are presented on an accrued basis.

Safety and Environment
There were no LTIs recorded at Pueblo Viejo during the fourth quarter of 2020 which resulted in an LTIFR6 of 0.00 per million hours worked, consistent with the prior quarter. There was one LTI recorded in 2020, which resulted in an LTIFR6 of 0.10 per million hours worked, compared to 0.67 in 2019. No Class 17 environmental incidents occurred during 2020 or 2019.

Financial Results
Q4 2020 compared to Q3 2020
Pueblo Viejo’s income for the fourth quarter of 2020 was 14% higher than the third quarter of 2020 due to higher sales volume, partially offset by a lower realized gold price4 and slightly higher cost of sales per ounce5.
Gold production for the fourth quarter of 2020 was 23% higher than the prior quarter mainly due to higher throughput driven by improved plant availability as well as higher grade.
Cost of sales per ounce5 and total cash costs per ounce4 for the fourth quarter of 2020 were 2% and 9% higher, respectively, than the prior quarter primarily reflecting the impact of higher plant maintenance costs and lower by-product credits related to external power sales from the Quisqueya power plant. The increase in cost of sales per ounce5 was partially offset by lower depreciation
on a per ounce basis resulting from the higher sales volumes. For the fourth quarter of 2020, all-in sustaining costs per ounce4 increased by 13% compared to the prior quarter, reflecting higher total cash costs per ounce4 and higher minesite sustaining capital expenditures.
Capital expenditures for the fourth quarter of 2020 increased by 120% compared to the prior quarter, primarily due to a ramp-up in project capital expenditures on the plant and tailings expansion project during the quarter. This was combined with higher minesite sustaining capital expenditures driven by the purchase of a new fleet to self-perform ore rehandling activities.

2020 compared to 2019
Pueblo Viejo’s income for 2020 was 26% higher than the prior year due to a higher realized gold price4, partially offset by lower sales volume and a higher cost of sales per ounce5.


BARRICK YEAR-END 2020
37
MANAGEMENT’S DISCUSSION AND ANALYSIS


INCOME AND EBITDA4

pvincome1.jpg

Gold production for 2020 was 8% lower than the prior year, mainly due to lower grades processed, partially offset by higher tonnes processed. We achieved record throughput in 2020 due to improved maintenance practices, with throughput 3% higher than the previous record set in 2019.

PRODUCTION (thousands of ounces)

pvproduction1.jpg

Cost of sales per ounce5 and total cash costs per ounce4 for 2020 increased by 10% and 7%, respectively, compared to the prior year, primarily reflecting the impact of lower grade, higher royalties due to the increase in the realized gold price4, and lower by-product credits related to external power sales from the Quisqueya power plant. For 2020, all-in sustaining costs per ounce4 increased by 12% compared to the prior year, mainly reflecting higher total cash costs per ounce4 and higher minesite sustaining capital expenditures.


COST OF SALES5, TOTAL CASH COSTS4
AND ALL-IN SUSTAINING COSTS4 ($ per ounce)

pvaisc1.jpg

Capital expenditures for 2020 increased by 109% compared to the prior year, primarily due to a ramp-up in project capital expenditures on the plant and tailings expansion project during the fourth quarter of 2020. This was combined with higher minesite sustaining capital expenditures related to the purchase of a new fleet for ore rehandling activities and higher capitalized stripping related to the development of Phases 10 to 12 at the Moore Pit.

2020 compared to Guidance
Gold production in 2020 of 542 thousand ounces was within the guidance range of 530 to 580 thousand ounces. Cost of sales per ounce5 and total cash costs per ounce4 were $819 and $504, respectively, compared to the guidance ranges of $840 to $890 per ounce and $520 to $570 per ounce, respectively. All-in sustaining costs per ounce4 was $660 compared to the guidance range of $720 to $770 per ounce. All per ounce cost metrics were below the 2020 guidance ranges reflecting the positive impact of lower energy prices and cost reduction initiatives from improved maintenance practices, partially offset by higher royalties resulting from a higher realized gold price4.

BARRICK YEAR-END 2020
38
MANAGEMENT’S DISCUSSION AND ANALYSIS


Loulo-Gounkoto (80% basis)a, Mali

Summary of Operating and Financial Data
For the three months ended For the years ended
   12/31/20 9/30/20 Change 12/31/20 12/31/19 Change
12/31/18 b
Total tonnes mined (000s) 8,582  8,145  5% 33,036  32,192  3% 30,926 
    Open pit ore 888  155  473% 1,698  2,726  (38)% 3,484 
    Open pit waste 7,111  7,416  (4)% 29,078  27,183  7% 25,278 
    Underground 583  574  2% 2,260  2,283  (1)% 2,164 
Average grade (grams/tonne)
    Open pit mined 5.01  2.07  142% 5.50  4.83  14% 3.10 
    Underground mined 4.55  4.48  1% 4.36  4.67  (7)% 5.10 
    Processed 4.41  4.74  (7)% 4.76  4.90  (3)% 4.31 
Ore tonnes processed (000s) 959  1,004  (4)% 3,916  3,945  (1)% 4,123 
Recovery rate 91  % 90  % 1% 91  % 92  % (1)% 92  %
Gold produced (000s oz) 123  139  (12)% 544  572  (5)% 528 
Gold sold (000s oz) 126  136  (7)% 542  575  (6)% 534 
Revenue ($ millions) 236  264  (11)% 966  806  20%
Cost of sales ($ millions) 146  149  (2)% 576  601  (4)%
Income ($ millions) 91  92  (1)% 358  190  88%
EBITDA ($ millions)c
143  147  (3)% 572  426  34%
EBITDA margind
61  % 56  % 8% 59  % 53  % 12%
Capital expenditures ($ millions) 27  71  (62)% 185  136  36%
    Minesite sustaining 21  62  (66)% 170  133  28%
    Project 6  (34)% 15  400%
Cost of sales ($/oz) 1,149  1,088  6% 1,060  1,044  2%
Total cash costs ($/oz)c
734  682  8% 666  634  5%
All-in sustaining costs ($/oz)c
923  1,161  (21)% 1,006  886  14%
All-in costs ($/oz)c
970  1,229  (21)% 1,034  891  16%
a.Barrick owns 80% of Société des Mines de Loulo SA and Société des Mines de Gounkoto with the Republic of Mali owning 20%. Loulo-Gounkoto is accounted for as a subsidiary with a 20% non-controlling interest on the basis that Barrick controls the asset. The results in the table and the discussion that follows are based on our 80% share, inclusive of the impact of the purchase price allocation resulting from the Merger.
b.These results did not form a part of the Barrick consolidated results as this site was acquired as a result of the Merger. As a result, operational statistics are presented for reference purposes only.
c. These are non-GAAP financial performance measures with no standardized meaning under IFRS and therefore may not be comparable to similar measures presented by other issuers. For further information and a detailed reconciliation of each non-GAAP measure used in this section of the MD&A to the most directly comparable IFRS measure, please see pages 96 to 122 of this MD&A.
d.Represents EBITDA divided by revenue.

Safety and Environment
There was one LTI recorded during the fourth quarter of 2020, which resulted in an LTIFR6 of 0.25 per million hours worked compared to 0.00 in the prior quarter. There was one LTI recorded in 2020, which resulted in an LTIFR6 of 0.07 per million hours worked compared to 0.22 in 2019. No Class 17 environmental incidents occurred during 2020 or 2019.

Financial Results
Q4 2020 compared to Q3 2020
Loulo-Gounkoto’s income for the fourth quarter of 2020 was 1% lower than the prior quarter, mainly due to lower sales volume reflecting lower gold production, higher cost of sales per ounce5 and a lower realized gold price4.
Gold production for the fourth quarter of 2020 was 12% lower than the prior quarter, mainly due to lower grades processed and lower plant throughput due to a girth gear replacement, partially offset by higher recovery.
Cost of sales per ounce5 and total cash costs per ounce4 for the fourth quarter of 2020 were 6% and 8% higher, respectively, due to the impact of lower grade and
throughput as well as higher underground mining rates despite a lower strip ratio at the open pit. For the fourth quarter of 2020, all-in sustaining costs per ounce4 decreased by 21% compared to the prior quarter, primarily reflecting lower minesite sustaining capital expenditures, partially offset by higher total cash costs per ounce4.
Capital expenditures for the fourth quarter of 2020 decreased by 62% compared to the prior quarter, primarily due to lower minesite sustaining capital expenditures driven by lower capitalized stripping at the Gounkoto open pit and a decrease in capital development at Loulo.

2020 compared to 2019
Loulo-Gounkoto’s income for 2020 was 88% higher than the prior year, primarily due to a higher realized gold price4, partially offset by lower sales volume and marginally higher cost of sales per ounce5.


BARRICK YEAR-END 2020
39
MANAGEMENT’S DISCUSSION AND ANALYSIS


INCOME AND EBITDA4

louloincome1.jpg

Gold production in 2020 was 5% lower compared to the prior year, primarily due to lower grades processed combined with slightly lower throughput and recovery.

PRODUCTION (thousands of ounces)

louloproduction1.jpg

Cost of sales per ounce5 and total cash costs per ounce4 in 2020 were 2% and 5% higher, respectively, compared to the prior year, mainly due to the impact of lower grades combined with higher royalties as a result of a higher realized gold price4 and higher operating costs. The increase in cost of sales per ounce5 was partially offset by lower depreciation. For 2020, all-in sustaining costs4 were 14% higher compared to the prior year reflecting higher total cash costs per ounce4 and increased minesite sustaining capital expenditures.

COST OF SALES5, TOTAL CASH COSTS4
AND ALL-IN SUSTAINING COSTS4 ($ per ounce)

louloaisc1.jpg

Capital expenditures in 2020 were 36% higher compared to the prior year, primarily due to higher minesite sustaining capital expenditures related to higher capitalized stripping at the Gounkoto open pit, together with higher project capital expenditures from the development of the Gounkoto underground.


2020 compared to Guidance
Gold production in 2020 of 544 thousand ounces was above the guidance range of 500 to 540 thousand ounces. Cost of sales per ounce5 of $1,060 was at the lower end of the guidance range of $1,050 to $1,100 per ounce. Total cash costs per ounce4 and all-in sustaining costs per ounce4 of $666 and $1,006, respectively, were also within the guidance ranges of $620 to $670 per ounce and $970 to $1,020 per ounce, respectively. Total cash costs per ounce4 and all-in sustaining costs4 per ounce would have been at the lower end of their respective ranges after adjusting for the impact of the higher realized gold price4 on royalty expense as 2020 guidance was based on a gold price assumption of $1,350 per ounce.

Regulatory Matters
On September 27, 2019, Mali adopted an ordinance introducing a new Mining Code of the Republic of Mali (the “2019 Mining Code”), which was ratified by the Malian National Assembly on April 28, 2020. The 2019 Mining Code cancels and replaces Law No. 2012-015 dated February 27, 2012 (the “2012 Mining Code”) and governs the mining industry going forward. The implementation decree to the 2019 Mining Code was adopted in November 2020.
Under the transitory provisions of the 2019 Mining Code, pre-existing mining titles and mining conventions in force remain valid for their remaining term and their holders continue to benefit from the stability of the tax and customs regime set out therein.
In addition, each of Loulo and Gounkoto (which together form Loulo-Gounkoto) have separate legally binding establishment conventions with the State of Mali, which guarantee the stability of the regime set out therein, govern applicable taxes and allow for international arbitration in the event of disputes. During the second quarter of 2020, an agreement was reached for a 15-year extension of the convention governing Loulo at its expiration in 2023.
Refer to note 36 of the Financial Statements for more information.
BARRICK YEAR-END 2020
40
MANAGEMENT’S DISCUSSION AND ANALYSIS


Kibali (45% basis)a, Democratic Republic of Congo

Summary of Operating and Financial Data
For the three months ended For the years ended
   12/31/20 9/30/20 Change 12/31/20 12/31/19 Change
12/31/18 b
Total tonnes mined (000s) 3,474  3,405  % 13,308  12,273  % 14,790 
    Open pit ore 308  380  (19) % 1,380  1,693  (18) % 2,455 
    Open pit waste 2,682  2,569  % 10,091  8,824  14  % 10,709 
    Underground 484  456  % 1,837  1,756  % 1,626 
Average grade (grams/tonne)
    Open pit mined 2.39  2.40  % 2.22  2.32  (4) % 2.43 
    Underground mined 5.37  5.01  % 5.20  5.12  % 5.06 
    Processed 3.60  3.67  (2) % 3.68  3.80  (3) % 3.45 
Ore tonnes processed (000s) 877  862  % 3,434  3,381  % 3,698 
Recovery rate 90  % 90  % % 90  % 89  % % 89  %
Gold produced (000s oz) 92  91  % 364  366  (1) % 363 
Gold sold (000s oz) 89  91  (3) % 364  363  % 370 
Revenue ($ millions) 168  176  (5) % 648  505  28  %
Cost of sales ($ millions) 104  99  % 397  403  (1) %
Income ($ millions) 58  74  (22) % 244  108  126  %
EBITDA ($ millions)c
106  117  (9) % 418  304  38  %
EBITDA margind
63  % 66  % (5) % 65  % 60  % %
Capital expenditures ($ millions) 12  14  (14) % 51  43  18  %
    Minesite sustaining 11  14  (21) % 49  41  20  %
    Project 1  % 2  %
Cost of sales ($/oz) 1,163  1,088  % 1,091  1,111  (2) %
Total cash costs ($/oz)c
616  617  % 608  568  %
All-in sustaining costs ($/oz)c
783  817  (4) % 778  693  12  %
All-in costs ($/oz)c
787  823  (4) % 782  701  12  %
a.Barrick owns 45% of Kibali Goldmines SA (Kibali) with the Democratic Republic of Congo ("DRC") and our joint venture partner, AngloGold Ashanti, owning 10% and 45%, respectively. Kibali is accounted for as an equity method investment on the basis that the joint venture partners that have joint control have rights to the net assets of the joint venture. The figures presented in this table and the discussion that follows are based on our 45% effective interest in Kibali, inclusive of the impact of the purchase price allocation resulting from the Merger.
b. These results did not form a part of the Barrick consolidated results as this site was acquired as a result of the Merger. As a result, operational statistics are presented for reference purposes only.
c.These are non-GAAP financial performance measures with no standardized meaning under IFRS and therefore may not be comparable to similar measures presented by other issuers. For further information and a detailed reconciliation of each non-GAAP measure used in this section of the MD&A to the most directly comparable IFRS measure, please see pages 96 to 122 of this MD&A.
d.Represents EBITDA divided by revenue.

Safety and Environment
Sadly, Kibali reported a fatality in the fourth quarter of 2020 at its underground operations as detailed earlier in the ESG section of this MD&A.
There were no LTIs recorded during the fourth quarter of 2020, which resulted in an LTIFR6 of 0.00 per million hours worked compared to 0.33 in the prior quarter. There were two LTIs recorded in 2020, which resulted in an LTIFR6 of 0.15 per million hours worked compared to 0.15 in 2019. No Class 17 environmental incidents occurred during 2020 or 2019.

Financial Results
Q4 2020 compared to Q3 2020
Kibali’s income for the fourth quarter of 2020 was 22% lower than the third quarter of 2020 due to a lower realized gold price4, lower sales volumes and increased cost of sales per ounce5.
Gold production for the fourth quarter of 2020 was 1% higher than the prior quarter, stemming from improved throughput due to a solid performance by the gravity gold
circuit, partially offset by lower grades processed in line with the plan.
Cost of sales per ounce5 for the fourth quarter of 2020 was 7% higher compared to the prior quarter, mainly due to an increase in depreciation. Total cash costs per ounce4 was in line with the prior quarter as lower grades and slightly higher site general and administrative expenses were offset by increased throughput, lower processing costs and underground mining costs that benefited from a record amount of ore tonnes mined. For the fourth quarter of 2020, all-in sustaining costs per ounce4 decreased by 4% compared to the prior quarter, mainly due to lower minesite sustaining capital expenditures.
Capital expenditures for the fourth quarter of 2020 decreased by 14% compared to the prior quarter, due to lower minesite sustaining capital expenditures driven by a reduction in capitalized drilling and underground development.

BARRICK YEAR-END 2020
41
MANAGEMENT’S DISCUSSION AND ANALYSIS


2020 compared to 2019
Kibali’s income for 2020 was 126% higher than the prior year due to a higher realized gold price4, lower cost of sales per ounce5 and slightly higher sales volume.

INCOME AND EBITDA4

kibaliincome1.jpg

Gold production in 2020 was 1% lower compared to the prior year due to lower grades processed, which was largely offset by improved throughput and recoveries.

PRODUCTION (thousands of ounces)

kibaliproduction1.jpg

Cost of sales per ounce5 in 2020 decreased by 2% compared to the prior year due to lower depreciation expense, partially offset by higher total cash costs4. Total cash costs per ounce4 was 7% higher, mainly due to
increased royalties resulting from the higher realized gold price4, as well as higher labor and logistics charges resulting from pandemic-related travel restrictions. This was partially offset by lower energy costs driven by an improved hydro power blend in the first half of the year and lower fuel prices. For 2020, all-in sustaining costs per ounce4 were 12% higher compared to the prior year reflecting higher total cash costs per ounce4 and higher minesite sustaining capital expenditures.

COST OF SALES5, TOTAL CASH COSTS4
AND ALL-IN SUSTAINING COSTS4 ($ per ounce)

kibaliaisc1.jpg

Capital expenditures in 2020 were 18% higher compared to the prior year, due to higher minesite sustaining capital expenditures resulting from higher capitalized stripping and drilling, although these were in line with plan.

2020 compared to Guidance
Gold production in 2020 of 364 thousand ounces was at the upper end of the guidance range of 340 to 370 thousand ounces. Cost of sales per ounce5 of $1,091 was slightly higher than the guidance range of $1,030 to $1,080 per ounce. Total cash costs per ounce4 of $608 was at the low end of the guidance range of $600 to $650 per ounce, while all-in sustaining costs per ounce4 of $778 was below the guidance range of $790 to $840 per ounce.

BARRICK YEAR-END 2020
42
MANAGEMENT’S DISCUSSION AND ANALYSIS


Veladero (50% basis)a, Argentina

Summary of Operating and Financial Data
For the three months ended  For the  years ended
  12/31/20 9/30/20 Change 12/31/20 12/31/19 Change 12/31/18
Open pit tonnes mined (000s) 8,883  6,930  28  % 29,108  36,758  (21) % 35,646 
    Open pit ore 3,792  3,385  12  % 13,678  16,048  (15) % 15,718 
    Open pit waste 5,091  3,545  44  % 15,430  20,710  (25) % 19,928 
Average grade (grams/tonne)
   Open pit mined 0.76  0.76  % 0.78  0.71  10  % 0.78 
   Processed 0.87  0.79  10  % 0.84  0.79  % 0.85 
Heap leach ore tonnes processed (000s) 2,976  3,189  (7) % 12,017  13,587  (12) % 13,547 
Gold produced (000s oz) 58  44  32  % 226  274  (18) % 278 
Gold sold (000s oz) 51  43  20  % 186  271  (31) % 280 
Revenue ($ millions) 99  82  21  % 333  386  (14) % 366 
Cost of sales ($ millions) 54  49  10  % 213  323  (34) % 310 
Income ($ millions) 44  30  47  % 114  57  100  % 53 
EBITDA ($ millions)b
61  47  30  % 183  172  % 174 
EBITDA marginc
62  % 57  % % 55  % 45  % 23  % 48  %
Capital expenditures ($ millions)d
35  18  94  % 113  106  % 143 
    Minesite sustainingd
35  18  94  % 98  91  % 143 
    Projectd
0  % 15  15  (2) %
Cost of sales ($/oz) 1,074  1,136  (5) % 1,151  1,188  (3) % 1,112 
Total cash costs ($/oz)b
698  708  (1) % 748  734  % 629 
All-in sustaining costs ($/oz)b
1,428  1,159  23  % 1,308  1,105  18  % 1,154 
All-in costs ($/oz)b
1,428  1,159  23  % 1,390  1,162  20  % 1,154 
a.Barrick owns 50% of Veladero with our joint venture partner, Shandong Gold, owning the remaining 50%. Veladero is proportionately consolidated on the basis that the joint venture partners that have joint control have rights to the assets and obligations for the liabilities relating to the arrangement. The figures presented in this table and the discussion that follows are based on our 50% interest in Veladero inclusive of the impact of remeasurement of our interest in Veladero following the disposal of a 50% interest on June 30, 2017.
b.These are non-GAAP financial performance measures with no standardized meaning under IFRS and therefore may not be comparable to similar measures presented by other issuers. For further information and a detailed reconciliation of each non-GAAP measure used in this section of the MD&A to the most directly comparable IFRS measure, please see pages 96 to 122 of this MD&A.
c.Represents EBITDA divided by revenue.
d.Presented on a cash basis as a result of adopting IFRS 16 Leases starting in 2019. Capital expenditures for 2018 are presented on an accrued basis.



Safety and Environment
There were no LTIs recorded at Veladero during the fourth quarter of 2020, which resulted in an LTIFR6 of 0.00 per million hours worked, compared to 0.99 in the prior quarter. There were three LTIs recorded in 2020, which resulted in an LTIFR6 of 0.31 per million hours worked compared to 0.37 in 2019. No Class 17 environmental incidents occurred during 2020 or 2019.
Minera Andina del Sol SRL, the joint venture company that operates the Veladero mine, is the subject of various regulatory proceedings related to operational incidents occurring in March 2017, September 2016 and September 2015. Refer to note 36 to the Financial Statements for more information regarding these and related matters.

Financial Results
Q4 2020 compared to Q3 2020
Veladero’s income for the fourth quarter of 2020 was 47% higher than the third quarter of 2020, primarily due to higher sales volume and lower cost of sales per ounce5, partially offset by the lower realized gold price4.
Gold production in the fourth quarter of 2020 was 32% higher than the prior quarter, primarily due to an
improvement in the pregnant leach solution (“PLS”) grade from a successful change in leaching strategy to optimize irrigation activities and ore placement.
Cost of sales per ounce5 and total cash costs per ounce4 in the fourth quarter of 2020 decreased by 5% and 1%, respectively, mainly due to the impact of higher sales volumes, partially offset by higher direct mining costs. In the fourth quarter of 2020, all-in sustaining costs per ounce4 was 23% higher than the previous quarter, primarily attributable to higher minesite sustaining capital expenditures.
Capital expenditures in the fourth quarter of 2020 increased by 94% compared to the prior quarter due to higher minesite sustaining capital expenditures that were previously deferred as a result of Covid-19 movement restrictions earlier in the year, as well as higher capitalized stripping.

2020 compared to 2019
Veladero’s income for 2020 was 100% higher than the prior year, primarily due to a higher realized gold price4 and lower cost of sales per ounce5, partially offset by lower sales volumes.
BARRICK YEAR-END 2020
43
MANAGEMENT’S DISCUSSION AND ANALYSIS


INCOME AND EBITDA4

veladeroincome1.jpg

In 2020, gold production decreased by 18% compared to the prior year, primarily due to the impact of quarantine and movement restrictions on mining operations and workforce mobilization in response to the Covid-19 pandemic, as well as the temporary cessation of irrigation on Phases 4B/5B for leach pad facility upgrades. This was partially offset by an improvement in PLS grade following a successful change in leaching strategy in the fourth quarter of 2020 as described above.

PRODUCTION (thousands of ounces)

veladeroproduction1.jpg

In 2020, cost of sales per ounce5 decreased by 3% compared to the prior year due to lower depreciation expense partially offset by higher total cash costs per ounce4. Total cash costs per ounce4 increased by 2% compared to the prior year, mainly due to the impact of lower sales volume, partially offset by lower direct operating costs. All-in sustaining costs per ounce4 in 2020 increased by 18% compared to the prior year, primarily due to the impact of higher minesite sustaining capital expenditures on a per ounce basis.
COST OF SALES5, TOTAL CASH COSTS4
AND ALL-IN SUSTAINING COSTS4 ($ per ounce)

veladeroaisc1a.jpg

In 2020, capital expenditures increased by 7% compared to the prior year, mainly due to higher minesite sustaining capital expenditures related to the Phase 6 leach pad expansion, Phases 4B/5B facility upgrades and higher capitalized stripping.

2020 compared to Guidance
Gold production in 2020 of 226 thousand ounces was below the guidance range of 240 to 270 thousand ounces. We had previously disclosed that production at Veladero was trending below guidance for 2020 at higher per ounce costs mainly due to the impact of quarantine and movement restrictions on mining operations and workforce mobilization in response to the Covid-19 pandemic.
Cost of sales per ounce5 was $1,151 compared to the guidance range of $1,220 to $1,270 per ounce due to lower depreciation. Total cash costs per ounce4 of $748 was higher than the guidance range of $670 to $720 per ounce, and all-in sustaining costs per ounce4 of $1,308 was slightly higher than the guidance range of $1,250 to $1,300 per ounce.

Regulatory matters
On December 23, 2019, the Argentine Congress enacted an emergency law reducing the rate for mining export duties to 8% from 12%. This emergency law was not in force during the first quarter of 2020 and exports of doré from Veladero during this period were subject to the higher 12% rate. Following the issuance of a legal injunction in favor of Veladero in March 2020, the reduced rate of 8% was applied to some doré shipments in the second quarter of 2020.
The Argentine Tax Authority appealed the March 2020 ruling and has continued to challenge the application of the reduced 8% rate. As a result, the majority of Veladero’s shipments of doré during the third quarter of 2020 were subject to the higher 12% rate.
On October 2, 2020, the Argentine government issued a new decree that established the rate for mining export duties at 8% from October 3, 2020 until December 31, 2021. Veladero has initiated legal actions to clarify that the lower 8% rate should apply to all doré shipments from December 23, 2019, when the emergency law was enacted.
On September 1, 2019, the Argentine government issued Decree 609/2019 announcing currency restrictions in Argentina (the "Decree"). Subsequently, the Central Bank of Argentina issued Communication “A” 6770 complementing the Decree. As a result, all export proceeds are required to be converted into Argentine pesos. Dividend distributions and payments to foreign suppliers now require specific authorizations from the Central Bank. These currency restrictions have had limited impact on mining operations to date but we continue to optimize the timing of our gold sales to minimize our exposure to currency devaluation, while advancing constructive discussions with the Central Bank on our rights to repatriate profits.







BARRICK YEAR-END 2020
44
MANAGEMENT’S DISCUSSION AND ANALYSIS


Porgera (47.5% basis)a, Papua New Guinea

Summary of Operating and Financial Data
For the three months ended  For the  years ended
  12/31/20 9/30/20 Change 12/31/20 12/31/19 Change 12/31/18
Total tonnes mined (000s)   —  0% 3,457  13,156  (74)% 9,862 
Open pit ore   —  0% 570  1,825  (69)% 568 
Open pit waste   —  0% 2,622  10,406  (75)% 8,529 
Underground   —  0% 265  925  (71)% 765 
Average grade (grams/tonne)
Open pit mined   —  0% 1.72  1.92  (10)% 2.06 
Underground mined   —  0% 5.72  6.67  (14)% 6.93 
Processed   —  0% 3.01  3.44  (13)% 3.46 
Autoclave ore tonnes processed (000s)   —  0% 936  2,640  (65)% 2,138 
Recovery Rate   —  0% 90  % 91  % (1)% 86  %
Gold produced (000s oz)   —  0% 86  284  (70)% 204 
Gold sold (000s oz)   —  0% 87  285  (69)% 213 
Revenue ($ millions)   —  0% 140  403  (65)% 269 
Cost of sales ($ millions) 5  0% 106  284  (63)% 212 
Income ($ millions) (17) (17) 0% (18) 113  (116)% 56 
EBITDA ($ millions)b
(12) (13) (8)% 7  155  (95)% 98 
EBITDA marginc
  —  0% 5  % 38  % (87)% 36  %
Capital expenditures ($ millions)d
  (100)% 11  45  (75)% 62 
Minesite sustainingd
  (100)% 11  45  (75)% 62 
Projectd
  —  0%   —  0% — 
Cost of sales ($/oz)   —  0% 1,225  994  23% 996 
Total cash costs ($/oz)b
  —  0% 928  838  11% 796 
All-in sustaining costs ($/oz)b
  —  0% 1,115  1,003  11% 1,083 
All-in costs ($/oz)b
  —  0% 1,116  1,003  11% 1,083 
a.Barrick owns 47.5% of Porgera with our joint venture partners, Zijin Mining and Mineral Resources Enga, owning the remaining 47.5% and 5%, respectively. Porgera is proportionately consolidated on the basis that the joint venture partners that have joint control have rights to the assets and obligations for the liabilities relating to the arrangement. The figures presented in this table and the discussion that follows are based on our 47.5% interest in Porgera.
b.These are non-GAAP financial performance measures with no standardized meaning under IFRS and therefore may not be comparable to similar measures presented by other issuers. For further information and a detailed reconciliation of each non-GAAP measure used in this section of the MD&A to the most directly comparable IFRS measure, please see pages 96 to 122 of this MD&A.
c.Represents EBITDA divided by revenue.
d.Presented on a cash basis as a result of adopting IFRS 16 Leases starting in 2019. Capital expenditures for 2018 are presented on an accrued basis.


Safety and Environment
There were no LTIs recorded at Porgera during the fourth quarter of 2020, which resulted in an LTIFR6 of 0.00 per million hours worked, in line with the previous quarter. There was one LTI recorded in 2020, which resulted in an LTIFR6 of 0.17 per million hours worked, compared to 0.45 in 2019. No Class 17 environmental incidents occurred during 2020 or 2019.

Financial Results
On April 25, 2020, Porgera was placed on care and maintenance after the Government of Papua New Guinea communicated on April 24, 2020 that the SML would not be extended. Refer to the section below for further details. This has had a significant negative impact on Porgera's financial results for the fourth quarter of 2020 and year ended December 31, 2020.


Q4 2020 compared to Q3 2020
As Porgera has been on care and maintenance since April 25, 2020, no analysis has been provided as it would not be meaningful. The loss of $17 million in the fourth quarter of 2020 mainly relates to care and maintenance costs as well as continued depreciation of certain assets.

2020 compared to 2019
In 2020, Porgera recorded a loss of $18 million compared to income of $113 million for the prior year, primarily due to the mine being placed on care and maintenance on April 25, 2020.

BARRICK YEAR-END 2020
45
MANAGEMENT’S DISCUSSION AND ANALYSIS


INCOME AND EBITDA4

porgeraincome1.jpg

In 2020, gold production was 70% lower compared to the prior year, primarily due to the mine being placed on care and maintenance on April 25, 2020.

PRODUCTION (thousands of ounces)

porgeraproduction1.jpg
a Due to the uncertainty related to the timing and scope of future developments on the mine’s operating outlook, the Company has not introduced 2021 guidance for Porgera.

In 2020, cost of sales per ounce5 and total cash costs per ounce4 increased by 23% and 11%, respectively, mainly due to the cessation of all mining activity after April 24, 2020 and the mine being placed on care and maintenance. Cost of sales per ounce5 increased compared to the same prior year period due to continued straight-line depreciation despite lower production. All-in sustaining costs per ounce4 in 2020 increased by 11% compared to the prior year due to increased total cash costs per ounce4, partially offset by lower minesite sustaining capital expenditures.

COST OF SALES5, TOTAL CASH COSTS4
AND ALL-IN SUSTAINING COSTS4 ($ per ounce)

porgeraaisc1.jpg
a Due to the uncertainty related to the timing and scope of future developments on the mine’s operating outlook, the Company has not introduced 2021 guidance for Porgera.

In 2020, capital expenditures decreased by 75% compared to the prior year as a result of the mine being placed on care and maintenance.
Porgera Special Mining Lease Extension
Porgera's SML terminated on August 16, 2019. The Company applied for a 20-year extension of the SML in June 2017 and has been engaging with the Government of Papua New Guinea on this matter since then. On August 2, 2019, the National Court of Papua New Guinea ruled that the provisions of the country’s 1992 Mining Act applied to the Porgera gold mine, thus allowing it to continue operating while the application to extend its SML was being considered. Also in 2019, in response to a request from Papua New Guinea Prime Minister Marape, the Company proposed a benefit-sharing arrangement that would deliver more than half the economic benefits from the Porgera mine to Papua New Guinea stakeholders, including the Government, for the remainder of the life of mine, estimated at 20 years.
On April 24, 2020, BNL, the majority owner and operator of the Porgera joint venture, received a communication from the Government of Papua New Guinea that the SML would not be extended. The Company believes the Government’s decision not to extend the SML is tantamount to nationalization without due process and in violation of the Government’s legal obligations to BNL. The Company has been engaged in ongoing discussions with Prime Minister Marape and his Government in light of the potentially catastrophic impact of this decision for the communities at Porgera and in Enga Province, and for the country as a whole. On October 15, 2020, BNL and Prime Minister Marape issued a joint press release indicating that they had productive discussions toward mutually acceptable arrangements for a new Porgera partnership to reopen and operate the mine going forward. It further indicated that the parties had agreed in principle that Papua New Guinea will take a major share of equity under the new arrangements and BNL will retain operatorship and there will be a fair sharing of the economic benefits. Efforts to reach a memorandum of agreement to make these concepts and additional points binding are underway. In the meantime, all legal proceedings continue as discussed below.
BNL has been pursuing and will pursue all legal avenues to challenge the Government’s decision and to recover any damages that BNL may suffer as a result of the Government’s decision. Based on the communication received from the Government of Papua New Guinea that the SML would not be extended, Porgera was placed on temporary care and maintenance on April 25, 2020 to ensure the safety and security of our employees and communities. BNL remains in possession of the mine to conduct care and maintenance.
On April 28, 2020, BNL filed a Judicial Review action against the Government of Papua New Guinea in the Papua New Guinea National Court of Justice. Judicial Review is a proceeding that challenges the procedural and constitutional adequacy of government administrative actions. The Judicial Review action seeks to quash the decision not to extend the SML on the grounds that the Government did not comply with the applicable legal standards and processes.
Trial was set to commence in the Judicial Review action on August 12, 2020. BNL sought leave to appeal two procedural rulings of the National Court that would affect the trial to the Supreme Court of Papua New Guinea. The Government of Papua New Guinea then asked the National Court to dismiss the Judicial Review action on purely
BARRICK YEAR-END 2020
46
MANAGEMENT’S DISCUSSION AND ANALYSIS


procedural grounds. On September 1, 2020, the Court granted the Government’s request and dismissed the Judicial Review action. BNL appealed that decision to the Supreme Court on September 7, 2020.
On October 1 and 6, 2020, the Supreme Court reversed the National Court's decision and granted BNL’s appeals of the two procedural rulings. The Supreme Court has not yet heard BNL’s appeal of the National Court’s dismissal of the Judicial Review action.
On August 25, 2020, the Government of Papua New Guinea purported to grant a new special mining lease covering the Porgera Mine to Kumul, the state-owned mining company. BNL immediately took administrative steps seeking to force the Government of Papua New Guinea to delay or withdraw the issuance of the special mining lease to Kumul. These administrative steps were not successful and on September 24, 2020, BNL commenced another Judicial Review action seeking to quash the decision to issue the special mining lease to Kumul. On January 26, 2021, the National Court granted BNL leave for the Judicial Review. In its decision, the Court declared itself satisfied that there was an arguable case that warrants the grant of the leave.
On July 9, 2020, BNL initiated conciliation proceedings before the World Bank’s ICSID. Through this conciliation, BNL seeks to reach an agreement for the extension of the SML on terms that will be mutually beneficial to the Company and to all Papua New Guinea stakeholders.
Simultaneously with BNL initiating the conciliation proceedings, Barrick PD, the Company’s subsidiary and an investor in the Porgera mine, has given notice to the Government of Papua New Guinea that a dispute has arisen under the BIT between Papua New Guinea and Australia, and has referred the dispute to arbitration before
the ICSID. Barrick PD seeks to recover damages it has already suffered and damages it may suffer in the future by virtue of the Government’s wrongful refusal to grant an extension of the SML. The dispute notice expressly invites the Government to engage in consultations and negotiations in an attempt to resolve the investment treaty dispute.

Porgera Tax Audits
In April 2020, BNL received a position paper from the Internal Revenue Commission ("IRC") in Papua New Guinea asserting various proposed adjustments and other tax liabilities amounting to $131 million (not including penalties, based on the kina foreign exchange rate as at December 31, 2020) arising from tax audits of BNL conducted for 2006 through 2015. BNL responded to the position paper on June 30, 2020. On October 2, 2020, BNL received amended assessments from the IRC which increased the amount of proposed adjustments and other taxes to $485 million (including penalties, based on the kina foreign exchange rate as at December 31, 2020). The Company has reviewed the amended assessments and concluded that there is no merit to the IRC’s tax audit adjustments, except for certain immaterial items for which a provision had already been made. BNL filed objections to the amended assessments on November 30, 2020 in accordance with the Papua New Guinea Income Tax Act.
The Company intends to defend its position vigorously and has not recorded any additional estimated amounts for the potential liability arising from the amended assessments as the Company cannot reasonably predict the outcome.


BARRICK YEAR-END 2020
47
MANAGEMENT’S DISCUSSION AND ANALYSIS


North Maraa, Tanzania

Summary of Operating and Financial Data
For the three months ended  For the  years ended
  12/31/20 9/30/20 Change 12/31/20 12/31/19 Change 12/31/18
Total tonnes mined (000s) 296  247  20% 3,758  10,388  (64)% 10,821 
    Open pit ore n/a n/a n/a 1,484  3,987  (63)% 1,837 
    Open pit waste n/a n/a n/a 1,197  5,532  (78)% 8,218 
    Underground 296  247  20% 1,077  869  24% 766 
Average grade (grams/tonne)
    Open pit mined n/a n/a n/a 2.14  2.03  6% 2.00 
    Underground mined 5.97  5.13  16% 6.19  6.82  (9)% 7.79 
Processed 3.08  3.59  (14)% 3.45  4.50  (23)% 3.96 
Ore tonnes processed (000s) 677  622  9% 2,546  1,829  39% 1,819 
Recovery rate 91  % 93  % (2)% 92  % 94  % (2)% 93  %
Gold produced (000s oz) 61  67  (9)% 261  251  4% 215 
Gold sold (000s oz) 63  69  (9)% 269  248  8% 212 
Revenue ($ millions) 120  132  (9)% 480  350  37% 270 
Cost of sales ($ millions) 69  61  13% 267  236  13% 169 
Income ($ millions) 49  72  (32)% 214  112  91% 94 
EBITDA ($ millions)b
66  89  (26)% 290  187  55% 134 
EBITDA marginc
55  % 67  % (18)% 60  % 53  % 13% 49  %
Capital expenditures ($ millions)d
27  17  59% 87  42  108% 52 
    Minesite sustainingd
11  83% 57  36  59% 47 
    Projectd
16  11  45% 30  400%
Cost of sales ($/oz) 1,073  903  19% 992  953  4% 795 
Total cash costs ($/oz)b
799  649  23% 702  646  9% 603 
All-in sustaining costs ($/oz)b
989  758  30% 929  802  16% 830 
All-in costs ($/oz)b
1,232  912  35% 1,039  824  26% 855 
a.Formerly part of Acacia Mining plc. On September 17, 2019, Barrick acquired all of the shares of Acacia it did not already own. The results presented are on a 63.9% basis until September 30, 2019 (notwithstanding the completion of the Acacia transaction on September 17, 2019, we consolidated our interest in Acacia and recorded a non-controlling interest of 36.1% in the income statement for the entirety of the third quarter of 2019 as a matter of convenience); on a 100% basis from October 1, 2019 to December 31, 2019; and on a 84% basis starting January 1, 2020, the date the GoT’s 16% free carried interest was made effective.
b. These are non-GAAP financial performance measures with no standardized meaning under IFRS and therefore may not be comparable to similar measures presented by other issuers. For further information and a detailed reconciliation of each non-GAAP measure used in this section of the MD&A to the most directly comparable IFRS measure, please see pages 96 to 122 of this MD&A.
c.Represents EBITDA divided by revenue.
d.Presented on a cash basis as a result of adopting IFRS 16 Leases starting in 2019. Capital expenditures for 2018 are presented on an accrued basis.


On January 24, 2020, Barrick announced that the Company had ratified the creation of Twiga at a signing ceremony with the President of Tanzania, formalizing the establishment of a joint venture between Barrick and the GoT and resolution of all outstanding disputes between Barrick and the GoT, including the lifting of the previous concentrate export ban, effective immediately. Effective January 1, 2020, the GoT received a free carried shareholding of 16% in each of our Tanzanian mines (Bulyanhulu, Buzwagi and North Mara), a 16% interest in the shareholder loans owed by the operating companies and will receive half of the economic benefits from the Tanzanian operations in the form of taxes, royalties, clearing fees and participation in all cash distributions made by the mines and Twiga, after the recoupment of capital investments. 
Refer to note 36 to the Financial Statements for more information regarding this matter.

Safety and Environment
There were no LTIs recorded at North Mara during the fourth quarter of 2020, which resulted in an LTIFR6 of 0.00 per million hours worked, versus 1.14 in the prior quarter. There were two LTIs recorded in 2020, resulting in an LTIFR6 of 0.28 per million hours worked, compared to 0.40 in 2019. No Class 17 environmental incidents occurred during 2020 or 2019.

Financial Results
Q4 2020 compared to Q3 2020
North Mara’s income for the fourth quarter of 2020 was 32% lower than the third quarter of 2020, mainly due to a lower realized gold price4, lower sales volumes and higher cost of sales per ounce5.
In the fourth quarter of 2020, gold production was 9% lower than the prior quarter, primarily due to lower grade processed from blending stockpiled material to supplement underground fresh ore feed to ramp up throughput and establish a new baseline for the plant.
BARRICK YEAR-END 2020
48
MANAGEMENT’S DISCUSSION AND ANALYSIS


Processing upgrades resulted in record throughput for the fourth quarter of 2020.
Cost of sales per ounce5 and total cash costs per ounce4 in the fourth quarter of 2020 were 19% and 23% higher, respectively, than the prior quarter, primarily due to the impact of lower grade and higher processing costs resulting from throughput improvements. This was combined with higher costs mainly associated with the new water treatment facilities. Cost of sales per ounce5 and total cash costs per ounce4 were further impacted by an extensive maintenance program designed to improve the availability of underground equipment, which resulted in increased underground tonnes mined. All-in sustaining costs per ounce4 in the fourth quarter of 2020 was 30% higher than the prior quarter as a result of higher total cash costs per ounce4 and higher minesite sustaining capital expenditures.
Capital expenditures in the fourth quarter of 2020 were 59% higher than the third quarter of 2020, driven by higher minesite sustaining capital expenditures and higher project capital expenditures. This was predominantly related to the improvements in the processing plant and the underground mine to further improve efficiency, the completion of the new water treatment plants during the quarter, and the commencement of the brine treatment facility.

2020 compared to 2019
North Mara’s income for 2020 was 91% higher than the prior year, primarily due to the change in our ownership interest from 63.9% until the end of the third quarter of 2019 and 100% for the fourth quarter of 2019 to 84% in the current year. This was combined with a higher realized gold price4 and higher sales volumes, partially offset by higher cost of sales per ounce5.

INCOME AND EBITDA4,a

northmaraincome1.jpg
a The results are presented on a 63.9% basis from January 1, 2018 to September 30, 2019, on a 100% basis from October 1, 2019 to December 31, 2019 and on a 84% basis starting January 1, 2020, the date the GoT’s 16% free carried interest was made effective.

In 2020, gold production was 4% higher than the prior year primarily due to the increase in our ownership interest. This was partially offset by lower grades processed in the current period following mine plan resequencing to ensure a relatively consistent feed grade over the life of mine, compared to the variability of the previous mine plan.




PRODUCTIONa (thousands of ounces)

northmaraproduction1.jpg
a The results are presented on a 63.9% basis from January 1, 2019 to September 30, 2019, on a 100% basis from October 1, 2019 to December 31, 2019 and on a 84% basis starting January 1, 2020, the date the GoT’s 16% free carried interest was made effective.

Cost of sales per ounce5 and total cash costs per ounce4 in 2020 were 4% and 9% higher, respectively, than the prior year, mainly due to increased royalty expense resulting from a higher realized gold price4, combined with higher direct mining costs from the transition to an exclusively underground operation following the cessation of open pit mining in the second quarter of 2020. All-in sustaining costs per ounce4 were 16% higher than the prior year due to an increase in minesite sustaining capital expenditures, combined with higher total cash costs per ounce4.

COST OF SALES5, TOTAL CASH COSTS4
AND ALL-IN SUSTAINING COSTS4 ($ per ounce)

northmaraaisc1.jpg

In 2020, capital expenditures increased by 108% compared to the prior year mainly due to the increase in our ownership interest and our investment in the tailings storage facility and other water management initiatives. We expect this capital investment to reduce over time as these legacy issues inherited from Acacia’s operation of this asset are addressed.

2020 compared to Guidance
Gold production in 2020 of 261 thousand ounces was at the upper end of the guidance range of 240 to 270 thousand ounces. All per ounce cost metrics were above the guidance ranges as a result of the temporary cessation of open pit mining in the second quarter of 2020, together with the impact of higher royalty expense due to a higher realized gold price4. Cost of sales per ounce5 was $992 compared to the guidance range of $750 to $800 per ounce. Total cash costs per ounce4 was $702 compared to $570 to $620 per ounce, and all-in sustaining costs per ounce4 was $929, compared to $830 to $880 per ounce.

 

BARRICK YEAR-END 2020
49
MANAGEMENT’S DISCUSSION AND ANALYSIS


Bulyanhulua, Tanzania

Summary of Operating and Financial Data
For the three months ended  For the  years ended
  12/31/20 9/30/20 Change 12/31/20 12/31/19 Change 12/31/18
Underground tonnes mined (000s) 73  10  630  % 83  n/a n/a n/a
Average grade (grams/tonne)
    Underground mined 9.00  7.55  19  % 8.81  n/a n/a n/a
Processed 3.14  1.01  211  % 1.35  1.09  24  % 1.24 
Ore tonnes processed (000s) 274  431  (36) % 1,618  1,531  % 1,214 
Recovery rate 81  % 50  % 61  % 62  % 50  % 24  % 53  %
Gold produced (000s oz) 23  229  % 44  27  63  % 26 
Gold sold (000s oz) 20  46  (57) % 103  27  281  % 27 
Revenue ($ millions) 36  98  (63) % 202  39  418  % 34 
Cost of sales ($ millions) 23  69  (67) % 154  33  367  % 33 
Income ($ millions) 13  25  (48) % 27  (14) (293) % (18)
EBITDA ($ millions)b
23  48  (52) % 87  100  % 15 
EBITDA marginc
64  % 49  % 30  % 43  % % 100  % 43  %
Capital expenditures ($ millions)d
37  17  118  % 64  1,180  %
    Minesite sustainingd
1  (50) % 6  200  %
    Projectd
36  15  140  % 58  1,833  %
Cost of sales ($/oz) 1,181  1,502  (21) % 1,499  1,207  24  % 1,231 
Total cash costs ($/oz)b
610  874  (30) % 832  676  23  % 650 
All-in sustaining costs ($/oz)b
664  913  (27) % 895  773  16  % 754 
All-in costs ($/oz)b
2,493  1,243  101  % 1,459  850  72  % 848 
a.Formerly part of Acacia Mining plc. On September 17, 2019, Barrick acquired all of the shares of Acacia it did not already own. The results presented are on a 63.9% basis until September 30, 2019 (notwithstanding the completion of the Acacia transaction on September 17, 2019, we consolidated our interest in Acacia and recorded a non-controlling interest of 36.1% in the income statement for the entirety of the third quarter of 2019 as a matter of convenience); on a 100% basis from October 1, 2019 to December 31, 2019; and on a 84% basis starting January 1, 2020, the date the GoT’s 16% free carried interest was made effective.
b. These are non-GAAP financial performance measures with no standardized meaning under IFRS and therefore may not be comparable to similar measures presented by other issuers. For further information and a detailed reconciliation of each non-GAAP measure used in this section of the MD&A to the most directly comparable IFRS measure, please see pages 96 to 122 of this MD&A.
c.Represents EBITDA divided by revenue.
d.Presented on a cash basis as a result of adopting IFRS 16 Leases starting in 2019. Capital expenditures for 2018 are presented on an accrued basis.


On January 24, 2020, Barrick announced that the Company had ratified the creation of Twiga at a signing ceremony with the President of Tanzania, formalizing the establishment of a joint venture between Barrick and the GoT and resolution of all outstanding disputes between Barrick and the GoT, including the lifting of the previous concentrate export ban, effective immediately. Effective January 1, 2020, the GoT received a free carried shareholding of 16% in each of our Tanzanian mines (Bulyanhulu, Buzwagi and North Mara), a 16% interest in the shareholder loans owed by the operating companies and will receive half of the economic benefits from the Tanzanian operations in the form of taxes, royalties, clearing fees and participation in all cash distributions made by the mines and Twiga, after the recoupment of capital investments. 
Refer to note 36 to the Financial Statements for more information regarding this matter.

Safety and Environment
There was one LTI recorded at Bulyanhulu during the fourth quarter of 2020, which resulted in an LTIFR6 of 0.87 per million hours worked, versus 0.00 in the prior quarter. This was the only LTI recorded at Bulyanhulu in 2020, which resulted in an LTIFR6 of 0.32 per million hours worked
versus 0.00 in 2019. No Class 17 environmental incidents occurred during 2020 or 2019.

Financial Results
Q4 2020 compared to Q3 2020
Bulyanhulu’s income for the fourth quarter of 2020 was 48% lower than the third quarter of 2020, mainly due to the lower realized gold price4 and lower sales volumes following the sale of the remainder of the stockpiled concentrate in the third quarter of 2020, partially offset by lower cost of sales per ounce5.
In the fourth quarter of 2020, gold production was 229% higher than the prior quarter. This increase was driven by the restart of underground mining operations at the end of the third quarter of 2020, which was followed by the processing of fresh underground material upon commissioning of the refurbished process plant in the fourth quarter of 2020. Notably, the current quarter represented the first time that fresh underground material was processed at the mill since Bulyanhulu was placed under care and maintenance in 2017.
Cost of sales per ounce5 and total cash costs per ounce4 in the fourth quarter of 2020 were 21% and 30% lower, respectively, than the prior quarter. Relative to the gold produced in the current quarter, the remaining
BARRICK YEAR-END 2020
50
MANAGEMENT’S DISCUSSION AND ANALYSIS


stockpiled concentrate sold in the prior quarter had a lower depreciation cost per ounce and a higher total cash cost per ounce4. All-in sustaining costs per ounce4 in the fourth quarter of 2020 was 27% lower than the prior quarter mainly as a result of lower total cash costs per ounce4.
Capital expenditures in the fourth quarter of 2020 were 118% higher than the third quarter of 2020, mainly due to higher project capital expenditures relating to the restart of underground mining operations as well as refurbishing and upgrading the process plant prior to commissioning.

2020 compared to 2019
Bulyanhulu’s income for 2020 was 293% higher than the prior year, primarily due to higher sales volumes related to the sale of the stockpiled concentrate and the re-start of underground mining and processing operations as described above. In addition to this, the change in our ownership percentage from 63.9% until the end of the third quarter of 2019 and 100% for the fourth quarter of 2019 to 84% in the current year also contributed to the higher income in the current year. This was combined with the higher realized gold price4 partially offset by higher cost of sales per ounce5.

INCOME AND EBITDA4,a

bulyincome1.jpg
a The results are presented on a 63.9% basis from January 1, 2018 to September 30, 2019, on a 100% basis from October 1, 2019 to December 31, 2019 and on a 84% basis starting January 1, 2020, the date the GoT’s 16% free carried interest was made effective.

In 2020, gold production was 63% higher than the prior year primarily due to the re-start of underground mining and processing operations, combined with the increase in our ownership interest.

PRODUCTIONa (thousands of ounces)

bulyproduction1.jpg
a The results are presented on a 63.9% basis from January 1, 2019 to September 30, 2019, on a 100% basis from October 1, 2019 to December 31, 2019 and on a 84% basis starting January 1, 2020, the date the GoT’s 16% free carried interest was made effective.


Cost of sales per ounce5 and total cash costs per ounce4 in 2020 were 24% and 23% higher, respectively, than the prior year, mainly due to the restart of underground mining and processing operations, as well as the sale of the relatively higher-cost stockpiled concentrate as described above. All-in sustaining costs per ounce4 were 16% higher than the prior year due to higher total cash costs per ounce4, partially offset by lower minesite sustaining capital expenditures on a per ounce sold basis.

COST OF SALES5, TOTAL CASH COSTS4
AND ALL-IN SUSTAINING COSTS4 ($ per ounce)

bulyaisc1.jpg

In 2020, capital expenditures increased by 1,180%, compared to the prior year mainly due to the restart of underground mining and processing operations.

2020 compared to Guidance
Gold production in 2020 of 44 thousand ounces was within the guidance range of 30 to 50 thousand ounces. Cost of sales per ounce5 of $1,499 was higher than the guidance range of $1,210 to $1,260 per ounce due to the impairment reversal recognized in the year, which resulted in increased depreciation. Total cash costs per ounce4 of $832 was within the guidance range of $790 to $840 per ounce, while all-in sustaining costs per ounce4 of $895 was lower than the guidance range of $1,110 to $1,160 per ounce.
BARRICK YEAR-END 2020
51
MANAGEMENT’S DISCUSSION AND ANALYSIS


Other Mines - Gold
Summary of Operating and Financial Data For the three months ended
12/31/20 9/30/20
Gold produced (000s oz) Cost of sales
($/oz)
Total cash costs
($/oz)a
All-in sustaining costs
($/oz)a
Capital Expend-ituresb
Gold produced (000s oz) Cost of sales
($/oz)
Total cash costs
($/oz)a
All-in sustaining costs
($/oz)a
Capital Expend-ituresb
Tongon (89.7%) 66 1,371  810  853  2  64 1,329  731  777 
Hemlo 57 1,379  1,104  1,464  20  55 1,257  1,099  1,497  21 
Buzwagi (84%) 21 1,314  1,267  1,283  0  21 907  687  693 
a.These are non-GAAP financial performance measures with no standardized meaning under IFRS and therefore may not be comparable to similar measures presented by other issuers. For further information and a detailed reconciliation of each non-GAAP measure used in this section of the MD&A to the most directly comparable IFRS measure, please see pages 96 to 122 of this MD&A.
b. Includes both minesite sustaining and project capital expenditures.

Tongon (89.7% basis), Côte d'Ivoire
Gold production for Tongon in the fourth quarter of 2020 was 3% higher than the prior quarter. Cost of sales per ounce5 in the fourth quarter of 2020 was 3% higher than the prior quarter as a result of higher direct mining and processing costs, partially offset by lower depreciation expense. All-in sustaining costs per ounce4 in the fourth quarter of 2020 was 10% higher than the prior quarter, mainly reflecting the increase in total cash costs per ounce4.
Gold production in 2020 of 255 thousand ounces was in the upper end of the guidance range of 240 to 260 thousand ounces. Cost of sales per ounce5 of $1,334 was lower than the guidance range of $1,390 to $1,440 per ounce. Total cash costs per ounce4 and all-in sustaining costs per ounce4 of $747 and $791, respectively, were both slightly above the guidance range of $680 to $730 per ounce and $740 to $790 per ounce, respectively. These per ounce costs would have been within the guidance range after adjusting for the impact of the higher realized gold price4 on royalty expense.

Hemlo, Ontario, Canada
Hemlo's gold production in the fourth quarter of 2020 was 4% higher than the prior quarter primarily due to higher grades. Cost of sales per ounce5 in the fourth quarter of 2020 was 10% higher than the prior quarter due to higher depreciation following the closure of the open pit in November 2020. Total cash costs per ounce4 were in line with the prior quarter. All-in sustaining costs per ounce4 decreased by 2% compared to the prior quarter owing to lower minesite sustaining capital expenditures.
Gold production in 2020 of 223 thousand ounces was above the guidance range of 200 to 220 thousand ounces. Cost of sales per ounce5 of $1,256 and total cash costs per ounce4 of $1,056 were both above the guidance range of $960 to $1,010 per ounce and $800 to $850 per ounce, respectively. All-in sustaining costs per ounce4 of $1,423 was also higher than the guidance range of $1,200 to $1,250 per ounce. As expected and previously disclosed, per ounce costs in 2020 were above guidance due to a significant increase in royalty expense from the higher realized gold price4 and mining in underground zones that incurred a higher net profit interest royalty burden. This was combined with the impact of movement restrictions in response to the Covid-19 pandemic, particularly on the ramp-up of underground development, which resulted in an increased proportion of higher-cost open pit stockpiled material processed at the mill.
As part of the Company’s efforts to elevate Hemlo to a Tier Two Gold Asset2, a new portal is currently under
development to access the Upper C Zone, with mining expected to start in the third quarter of 2021. Improving flexibility with a third mining front at Hemlo will allow underground throughput to ramp-up to a steady state of 1.9 million tonnes per annum from 2022 onwards. In addition, we have planned drilling programs to potentially add resources to extend the mine life past 2030.

Buzwagi (84% basis), Tanzania
Gold production for Buzwagi in the fourth quarter of 2020 was in line with the third quarter of 2020. Cost of sales per ounce5 and all-in sustaining costs per ounce4 in the fourth quarter of 2020 were 45% and 85% higher, respectively, than the prior quarter, following the sale of the remainder of the stockpiled concentrate in the third quarter of 2020.
Gold production in 2020 of 84 thousand ounces was within the guidance range of 80 to 100 thousand ounces. Cost of sales per ounce5 of $1,021 was higher than the guidance range of $850 to $900 per ounce, driven by higher depreciation expense following a transition to owner-operator stockpile rehandling. Total cash costs per ounce4 and all-in sustaining costs per ounce4 of $859 and $871, respectively, were both within the guidance range of $820 to $870 per ounce and $850 to $900 per ounce, respectively.




BARRICK YEAR-END 2020
52
MANAGEMENT’S DISCUSSION AND ANALYSIS


Other Mines - Copper
Summary of Operating and Financial Data For the three months ended
12/31/20 9/30/20
Copper production (millions of pounds) Cost of sales
($/lb)
C1 cash costs
($/lb)a
All-in sustaining costs
($/lb)a
Capital Expend-ituresb
Copper production (millions of pounds) Cost of sales
($/lb)
C1 cash costs
($/lb)
a
All-in sustaining costs
($/lb)
a
Capital Expend-ituresb
Lumwana 78 1.96  1.58  2.60  48  62 2.06  1.49  2.58  63 
Zaldívar (50%)
23 2.68  2.01  2.70  29  24 2.20  1.64  2.27  17 
Jabal Sayid (50%) 18 1.53  1.15  1.27  2  17 1.43  1.14  1.17 
a.These are non-GAAP financial performance measures with no standardized meaning under IFRS and therefore may not be comparable to similar measures presented by other issuers. For further information and a detailed reconciliation of each non-GAAP measure used in this section of the MD&A to the most directly comparable IFRS measure, please see pages 96 to 122 of this MD&A.
b. Includes both minesite sustaining and project capital expenditures.

Lumwana, Zambia
Copper production for Lumwana in the fourth quarter of 2020 was 26% higher compared to the prior quarter, resulting from a significant improvement in throughput, as the prior quarter was affected by maintenance. Cost of sales per pound5 in the fourth quarter of 2020 was 5% lower than the prior quarter primarily due to lower depreciation expense. In the fourth quarter of 2020, all-in sustaining costs per pound4 increased by 1% compared to the prior quarter, primarily due to higher C1 cash costs per pound4, partially offset by decreased minesite sustaining capital expenditures and the impact of lower sales volumes.
Copper production in 2020 of 276 million pounds was near the top end of the guidance range of 250 to 280 million pounds. Cost of sales per pound5 of $2.01 was below the guidance range of $2.20 to $2.40 per pound, driven by the strong operating performance. C1 cash costs per pound4 of $1.56 and all-in sustaining costs4 of $2.43 per pound were both within the guidance ranges of $1.50 to $1.70 and $2.30 to $2.60 per pound, respectively.

Zaldívar (50% basis), Chile
Copper production for Zaldívar in the fourth quarter of 2020 was 4% lower than the prior quarter mainly due to lower grades. Cost of sales per pound5 in the fourth quarter of 2020 was 22% higher than the prior quarter, primarily due to additional costs recognized relating to the settlement of labor contract negotiations. All-in sustaining costs per pound4 increased by 19% compared to the prior quarter, primarily due to the impact of higher C1 cash costs per pound4, as well as higher minesite sustaining capital expenditures that were previously deferred as a result of Covid-19 movement restrictions earlier in the year.
Copper production in 2020 of 106 million pounds was below the bottom end of the guidance range of 120 to 135 million pounds. Cost metrics per pound were within, or slightly below the guidance ranges benefiting from the impact of lower energy prices and a favorable exchange rate. Cost of sales per pound5 was $2.46 compared to guidance of $2.40 to $2.70 per pound. C1 cash costs per pound4 was $1.79, compared to guidance of $1.65 to $1.85 per pound, and all-in sustaining costs per pound4 was $2.25, compared to guidance of $2.30 to $2.60 per pound.
Following the completion of mining through a higher-grade zone for the last two years, we expect grades to decline in 2021. Major maintenance is currently scheduled in the second quarter of 2021.

Jabal Sayid (50% basis), Saudi Arabia
Jabal Sayid's copper production in the fourth quarter of 2020 was 6% higher compared to the prior quarter, mainly due to an increase in throughput following improvements to the milling circuit and higher plant availabilities. Cost of sales per pound5 in the fourth quarter of 2020 was 7% higher than the prior quarter as a result of increased depreciation and slightly higher C1 cash costs per pound4. All-in sustaining costs per pound4 in the fourth quarter of 2020 increased by 9% when compared to the prior quarter, mainly due to increased minesite sustaining capital expenditures on a per pound basis.
Copper production in 2020 of 75 million pounds exceeded the guidance range of 60 to 70 million pounds, with the mine exceeding expectations on grade and tonnes, and the plant outperforming on both throughput and plant availabilities. All of the per pound cost metrics were significantly below the guidance ranges, driven by increased production, lower fuel prices and higher gold by-product credits from copper concentrate sales. Cost of sales per pound5 was $1.42, compared to guidance of $1.75 to $2.00 per pound. C1 cash costs per pound4 was $1.11, compared to guidance of $1.40 to $1.60 per pound, and all-in sustaining costs per pound4 was $1.24, compared to guidance of $1.50 to $1.70 per pound.

BARRICK YEAR-END 2020
53
MANAGEMENT’S DISCUSSION AND ANALYSIS


Growth Project Updates
Goldrush Complex, Nevada, USA
At the Goldrush Complex, drilling operations continue at both Goldrush and Fourmile (Fourmile is currently not included in the Nevada Gold Mines joint venture with Newmont, but may be contributed if certain criteria are met in the future). The main objectives of this drilling program remain orebody definition, testing of orebody continuity, inferred resource growth and definition of exploration upside. Options for reducing the cost and timing of exploration drilling of Fourmile through underground access from Goldrush are currently being explored.
Contractor development of the twin exploration declines at Goldrush has now been completed. The handover from contractor to owner development was completed in November 2020, according to plan. All equipment required for owner development arrived on site in the fourth quarter of 2020.
During 2021, underground development and exploration will continue at Goldrush. First ore is expected to be exposed in the first half of 2021 as part of ongoing exploration and development activities, in line with previous guidance. Activities in 2021 will focus on verifying geological, geotechnical and geohydrological models developed during the feasibility study until the Record of Decision ("ROD") is received. Following receipt of the ROD, construction of infrastructure to allow the ramp-up of production activities will commence.
As at December 31, 2020, we have spent $221 million (including $22 million in the fourth quarter of 2020) on the Goldrush project, inclusive of the exploration declines (100% basis). The current capital estimate for the Goldrush project remains under review, subject to the completion of the final Goldrush feasibility study. The study documentation is now expected to be completed in the second quarter of 2021.
Permitting activities continued to advance largely on-track. However, we now expect the receipt of a positive ROD in the first quarter of 2022 (previously the fourth quarter of 2021). This updated schedule does not impact the current mineplan at this time.
Mineral reserves at Goldrush are unchanged from 2019, and will be updated following the completion of the feasibility study currently underway. As of December 31, 2020, attributable mineral resources total 26 million tonnes at 6.57 g/t Au for 5.5 million ounces in the indicated category (inclusive of reserves), and 12 million tonnes at 6.2 g/t Au for 2.5 million ounces in the inferred category. Resource growth in 2020 is based on an optimized underground stoping design that anticipates increased use of bulk mining methods, allowing for greater mining flexibility and an associated reduction in cut-off grades. As such, the 2020 mineral resource base reflects higher tonnes and lower grades compared to 2019, as well as a reclassification of a portion of indicated resources to inferred based on a review of modelling parameters. The 2019 mineral resource base was 26 million tonnes at 7.80 g/t Au for 6.6 million ounces in the indicated category (inclusive of reserves), and 4.8 million tonnes at 7.6 g/t Au for 1.2 million ounces in the inferred category.
We have also increased our geological confidence in Fourmile, which currently sits outside of the Nevada Gold Mines joint venture. Fourmile has grown its total mineral resource year-over-year following an extensive exploration and MRM program, allowing us to now declare a portion in
the indicated resource category. As of December 31, 2020, Fourmile’s indicated resource is 1.4 million tonnes at 10.22 g/t Au containing 0.47 million ounces, with an inferred resource of 6.6 million tonnes at 10.9 g/t Au containing 2.3 million ounces.

Turquoise Ridge Third Shaft, Nevada, USA11
Construction of the Third Shaft at Turquoise Ridge, which has a hoisting capacity of 5,500 tonnes per day, continues to advance according to schedule and within budget. We continue to expect commissioning in late 2022. Together with increased hoisting capacity, the Third Shaft is expected to provide additional ventilation for underground mining operations as well as shorter material haulage distances.
Construction activities continued in the fourth quarter of 2020, including the excavation and lining of the first loading pocket, ongoing shaft sinking activities as well as surface construction works focused on the permanent materials handling system. The excavation of the first loading pocket marks the first connection to the mine workings at 695 meters below collar. Shaft sinking has continued below the loading pocket and has now advanced to a depth of approximately 740 meters below the collar as of December 31, 2020.
As of December 31, 2020, we have spent $166 million (including $11 million in the fourth quarter of 2020) out of an estimated capital cost of approximately $300-$330 million (100% basis).

Pueblo Viejo Process Plant and Tailings Expansion, Dominican Republic12
Studies for the process plant and tailings expansion at the Pueblo Viejo mine remain supportive of an increase in throughput to 14 million tonnes per annum, allowing the operation to maintain minimum average annual gold production of approximately 800,000 ounces after 2022 (100% basis).
The process plant expansion flowsheet includes an additional primary crusher, coarse ore stockpile and ore reclaim delivering to a new single stage semi-autogenous (“SAG”) mill. A new flotation circuit will concentrate the bulk of the sulfide ore prior to oxidation. The concentrate will be blended with fresh milled ore to feed the modified autoclave circuit, which will have additional oxygen supplied from a new 3,000-tonnes-per-day facility. The existing autoclaves will be upgraded to increase the sulfur processing capacity of each autoclave through additional high-pressure cooling water and recycle flash capability using additional slurry pumping and thickening.
Engineering design of the process plant expansion continued to progress during the final quarter of 2020, with basic engineering now complete. Overall engineering of the process plant expansion is now 50% complete. Bulk steel fabrication contracts and the first major construction contract have been awarded. Procurement contracts and purchase orders are being placed in accordance with the schedule and costs are within budget.
Construction for the process plant expansion continued to ramp up during the fourth quarter of 2020 following approval of the Environmental Impact Assessment in the prior quarter. Bulk earthworks for the accommodation, primary crusher, stockpile, oxygen plant and flotation areas of the process plant expansion were completed. Field investigations focused on geotechnical and groundwater
BARRICK YEAR-END 2020
54
MANAGEMENT’S DISCUSSION AND ANALYSIS


conditions, while engineering design is progressing according to plan for the infrastructure and waste stockpile extensions. Land acquisition has commenced for the freshwater pipeline relocation. We continue to expect completion of the process plant expansion by the end of 2022.
The social, environmental and technical studies for additional tailings capacity to support the expansion of the process plant continued to advance. The Dominican Republic government and relevant national authorities are actively supporting the project. The efforts are now focused on community relations and baseline environmental monitoring.
As of December 31, 2020, we have spent $91 million (including $64 million in the fourth quarter of 2020) out of an estimated capital cost of approximately $1,300 million (100% basis).

Bulyanhulu Re-Start Project and Feasibility Study
The Bulyanhulu underground ramp-up was on track in the fourth quarter of 2020, with production ahead of plan by 6% on the back of a successful stoping campaign. The production ramp-up is scheduled to continue through the first half of 2021 and reach annualized steady-state production by 2022.
The updated geological model for Reef 1 was successfully validated with a campaign feed test at the mill and an infill grade-control drill program. This model now forms the basis for the 2020 mineral resources and mineral reserves update. Further test work is currently underway to develop a geo-metallurgical model for optimization of the life-of-mine plan.
The feasibility study for the optimized mine plan at Bulyanhulu continues to progress and successfully define extensions to the underground mineral resource within the high-grade Deep West zone. Updated geotechnical numerical models were completed in the fourth quarter of 2020, which will be used in conjunction with planned metallurgical test work to define the optimal mining sequence for the feasibility study. Further geological re-modeling of Reef 2 mineralization is planned for the first quarter of 2021 to advance the work already completed. We continue to expect completion of the feasibility study in the second half of 2021.
Strong recoveries of low carbonaceous ore from the gravity and carbon-in-leach (“CIL”) flowsheet during plant commissioning has led management to consider a flowsheet change to produce more gold in doré by leaching before sulphide flotation. This would produce approximately 90% of gold on site in doré bullion, with a much smaller amount reporting to a flotation concentrate, which mostly contains copper. The forward leach (leaching before the flotation stage) would involve higher cyanide consumption from partial copper dissolution, but the economics of this potential processing route are encouraging. The current ore feed is amenable to this flowsheet change, but the other ore types may still require a “flotation before leach” approach to deal with more refractory (carbonaceous) material in those domains. The different process options require piping changes for each configuration, but with better understanding of the metallurgy, there may be other options on processing routes and ore campaigning. Trade-off studies to assess this benefit on recovery against the
impact on planning and mining sequence will be completed, alongside additional drilling to define the different geometallurgical domains within the overall orebody. The ability to beneficiate more gold into doré and minimize gold content in the sulphide flotation concentrate would be a major improvement for Bulyanhulu as we optimize the mineplan.

Zaldívar Chloride Leach Project, Chile
Zaldívar is jointly owned by Antofagasta and Barrick, and is operated by Antofagasta.
In December 2019, the Board of Compañía Minera Zaldívar approved the Chloride Leach Project. The capital cost of the project of $189 million (100% basis) consists of the cost of execution and commissioning. The project contemplates the construction of a chloride dosing system, an upgrade of the solvent extraction plant and the construction of additional washing ponds.
In the fourth quarter of 2020, the construction camp was completed and site construction work started. The excavation for foundations and initial concrete works were completed at the salt storage and brine preparation areas. The work at the solution extraction area focused on the excavation and initial concrete works for channels, washing ponds and decanters. Inside the solution extraction area, the first of four streams was stopped for modifications, which are progressing according to schedule.
Overall progress is at 42% completion. Project costs are trending in line with the approved budget and completion is expected in the first half of 2022.
Upon commissioning, the project is expected to increase copper recoveries by more than 10 percentage points through the addition of chlorides to the leach solution and with further potential upside in recoveries possible depending on the type of ore being processed. This process is based on a proprietary technology called CuproChlor® that was developed by Antofagasta at its Michilla operation, which had similar ore types to those that are processed at Zaldívar. Once completed and in full operation, the project is expected to increase production at Zaldívar by approximately 10 to 15 thousand tonnes per annum at lower operating costs over the remaining life of mine.

Veladero Power Transmission Project, Chile-Argentina
In 2019, we commenced construction of an extension to the existing Pascua-Lama power transmission line to connect to Veladero. Upon completion, the power transmission line will allow Veladero to convert to grid power exported from Chile and cease operating the current high-cost diesel generation power plant located at site. A power purchase price agreement was executed during the fourth quarter of 2019 to supply power from renewable energy that will significantly reduce Veladero’s carbon footprint. This is expected to save 32 million liters of fuel per year and reduce CO2 emissions by 83,000 tonnes per year upon commissioning.
We are engaging various contractors with the aim to re-mobilize in the first quarter of 2021 following quarantine and movement restrictions in response to the Covid-19 pandemic in 2020, which delayed construction. We continue to expect completion of the Veladero power transmission project by the end of 2021.

BARRICK YEAR-END 2020
55
MANAGEMENT’S DISCUSSION AND ANALYSIS


Exploration and Mineral Resource Management
The foundation of our exploration strategy starts with a deep organizational understanding that exploration is a value driver for the business and an investment - not a process. Our strategy has multiple elements that all need to be in balance to deliver on the Group's business plan for growth and long-term sustainability.
Firstly, we seek to deliver projects of a short-to medium-term nature that will drive improvements in mine plans. Secondly, we seek to make new discoveries that add to Barrick's Tier One1 portfolio. Thirdly, we seek to optimize the value of major undeveloped projects. Finally, we seek to identify emerging opportunities early in their value chain and secure them by an earn-in or outright acquisition, where appropriate.
Our exploration approach is to first understand the geological framework and ore controls. We then design exploration programs around that understanding, instead of simply drilling for mineralized intervals. This has put us in good stead with robust results from multiple projects highlighted in the following section.

North America
Current exploration efforts are focused on finding extensions of Tier One1 deposits, many of which are in operation. Earlier stage exploration is targeting value creating discoveries and continues to open up new frontiers in Nevada, as well as around Hemlo. At the deposit scale, geological cross-sections were updated at all mines. Building on the sectional interpretation, models are being continuously upgraded with notable advances during the fourth quarter of 2020 at Turquoise Ridge, Leeville, Ren, Goldrush and Fourmile. Exploration and delineation activities are well aligned with the 2021 business and life of mine plans.

Carlin, Nevada, USA13, 14, 15, 16
North of Leeville, targeting is following up on high-grade mineralization along the Basin Bounding fault to realize the full potential of this emerging growth target and add this to the mine plan. Five holes of a seven-hole program initiated in the third quarter of 2020 were completed, with the last two holes in progress at the end of the year. Together with previous intercepts, results of 32.9 meters at 16.9 g/t Au and 12.3 meters at 18.3 g/t Au confirm significant potential in the footwall of the Basin Bounding fault near the intersection of the north and south margins of a buried stock. Results from two scout holes drilled along the eastern edge of the target area intersected thick intervals of variably altered favorable host rock, though ore grade mineralization was not identified. Closer to the mine, the search space has expanded westward by 30 to 100 meters as the location of major faults, including the Basin Bounding fault, are better constrained by the additional core holes. Taking advantage of this, drilling from underground continues to extend the Turf orebody to the north and west. Results from a fan of delineation holes at the northwest edge of the Turf resource highlight the growth potential and includes intercepts of 10.7 meters at 11.1 g/t Au and 12.2 meters at 10.6 g/t Au. Following strong results of 82 meters at 23.8 g/t Au in the prior quarter, the best intercept in the fourth quarter of 2020 was 12.7 meters at 17.3 g/t Au, which follows the footwall contact of an ore bounding dike highlighting the importance of this secondary control. Drilling to add resources and support reserve conversion continues from both surface and underground platforms.
Across Little Boulder Basin to the west, drilling along the Post-Gen fault, an important district-scale ore controlling structure transecting the north Carlin Trend, successfully followed up on mineralization recently intersected. A daughter hole was directionally drilled from a hole reported in the prior quarter and further delineates strong alteration along the down-plunge extension of the Deep Post orebody. Three kilometers along strike to the south, drilling following up on the interpreted feeder of the Tristar deposit, an active open pit mine, intersected multiple significant intercepts including 3.7 meters at 14.7 g/t Au and 2.9 meters at 17.1 g/t Au. These results are higher grade than adjacent results and additional follow-up is planned.

Cortez, Nevada, USA17
At Cortez Hills, drilling from underground platforms continues to test extensions, with a focus on targeting feeder zones below the mine. Drilling targeting a 160 meter down-dip offset of known mineralization along a potential feeder structure confirmed the presence of metasomatism and sulfidation. The drilling yielded two significant intervals, including 7.8 meters at 7.8 g/t Au, extending previous mineralization adjacent to the mine, and a second 8.7 meters at 4.8 g/t Au, supporting the interpretation of a feeder structure along the Hanson Fault. These results, along with those reported in the second quarter of 2020, are early stage but conceptually encouraging. Additional drill programs further testing the feeders and other ore controlling features are planned in the first quarter of 2021.
On the western side of the district, sectional interpretation is ongoing between the Carlin-type Pipeline and Crossroads deposits as well as the intrusive-related mineralization at Robertson five kilometers to the north. The relationship between the deposits is unclear and understanding the geology and mineralization potential between them is a priority.

Fourmile, Nevada, USA18
The Fourmile year-end resource has significantly increased from 2019 as highlighted in the Reserves and Resources section of this MD&A. Significant exploration upside remains, which we aim to convert to resources over time. This drilling will need to be from the surface with regards to defining orebody occurrences and evaluating the potential of the entire project area. All indications are that the evaluation of the orebodies themselves would best be done via underground drilling programs. Drilling activities have stopped given the winter season, and will resume in the first quarter of 2021. Exploration will then focus on establishing a geological framework well beyond the existing resource, where the character of mineralization appears to be changing again.

Turquoise Ridge, Nevada, USA
During the fourth quarter of 2020, work continued to refine the Turquoise Ridge underground geological model. Focus has been placed on upgrading the grade control model that encompasses the bulk of active headings to provide an improved foundation for mine design, planning, and reconciliation. These improvements will expand to the entire deposit with additional modeling milestones in the first and second quarters of 2021. At the district scale, sectional interpretation continues across the sparsely drilled corridor between the Turquoise Ridge and Twin Creeks operations, identifying targets in the process for future testing.

BARRICK YEAR-END 2020
56
MANAGEMENT’S DISCUSSION AND ANALYSIS


Hemlo, Canada
Land consolidation east of Hemlo has doubled the prospective search space across the camp following a property acquisition and the completion of two option agreements. Knowledge from the Hemlo orebody will be leveraged as exploration activities ramp up at the new properties.
At the Blackfly target west of the mine, all seven holes of a 2,000-meter surface drill program to follow up on results from trenching, intersected the same horizon that was mineralized in trenches. This highlights the potential to expand mineralization to the west.
Below the B Zone (also known as Main Zone), a recently completed hole, testing multiple concepts adjacent to the important Moose Lake porphyry intersected a 15- to 20- meter-thick zone of feldspar-molybdenite-pyrite-barite alteration that resembles the Main Zone. The intercept is in a sparsely tested area, hundreds of meters below the deepest development, opening up a large area down-plunge of the Main Zone for follow-up.

Latin America & Asia Pacific
Pueblo Viejo, Dominican Republic
A second phase of the 3D induced polarization (“IP”) geophysics survey was completed during the fourth quarter of 2020. A northwest trending resistivity and chargeability anomaly coincides with soil and rock chip sample anomalies. The anomalies are cut by projected late low angle structures, with a series of partially-tested and untested zones at relatively shallow depths. At least one of these anomalies will require further investigation, with drilling expected in 2021.
A state-of-the-art structural model was completed at Pueblo Viejo during the third quarter of 2020. The model was projected over the entire property, improving the understanding of mineralization controls in the district, and unlocking a new generation of brownfield targets. Follow-up mapping and sampling in one of those targets, Zambrana, has revealed significant mineralization in rock chips. Detailed mapping and soil sampling continue.
A drill permit for Target Area 1 in the Pueblo Grande Joint Venture was granted during November 2020. An initial exploration campaign of 2,500 meters commenced in late December 2020.

El Indio Belt, Argentina and Chile
At Pascua-Lama, a four-rig 5,400-meter geometallurgical drill campaign was initiated. The drilling is designed to test the geometallurgy assumptions of the previously completed update to the “data-driven” 3D geological model. The objective of this campaign is to test the link between the underlying deposit geology, impact to ore type definition, processing options, recovery and project valuation. At the Penelope deposit (a satellite of Lama), a smaller geometallurgical drill campaign resumed. This program aims to collect additional metallurgical data, with a specific focus on heap leach potential.
A new structural framework study completed for Del Carmen-Alturas in the third quarter of 2020 was a significant component of drill planning for 2021. Detailed mapping in Chibolita and Rojo Grande North is in progress, where drilling is scheduled to start in the first quarter of 2021.
Fieldwork commenced at Bañitos within the El Indio mine camp in Argentina. This target spans 16 km2, and 260 talus fines samples on a 200 meter by 200 meter
grid have been collected (27% of planned samples). Detailed mapping is ongoing.

Veladero, Argentina
At the district level, fieldwork continued at two brownfield targets, slated for drill testing in the first quarter of 2021. Field review of the Veladero Sur target found evidence of potential for a porphyry Au-Cu system. Further work will be conducted during the current field season to validate the concept.
Work resumed in other targets in the district, such as Penelope, Lama East and Cerro Pelado. At Cerro Pelado, detailed mapping recognized steam-heated and advanced argillic alteration in an area previously not identified, opening up the target to the southeast. Drilling commenced in January 2021.

Porgera, Papua New Guinea
As discussed on page 36, Porgera has been placed on temporary care and maintenance and consequently, all exploration activities have ceased.

Lagunas Norte, Peru
In the Lagunas Norte district, a new 3D model was completed, using compilation and analysis of over 20 years of historic mapping. This included the construction of 21 east-west and three north-south traverse geological sections in the field, allowing for the verification of historical information and improvement of geological understanding. This upgraded geological model reveals a district scale preservation control to mineralization and identifies new targets. Follow-up mapping in Las Ruecas has identified potential for a porphyry gold-copper system at the Gabriela target.

Southern Peru
An airborne magnetic survey was successfully completed over the Tumaruma project. Preliminary data shows an area of low magnetic response related with the Tumaruma target that correlates with silica and advanced argillic alteration recognized during mapping, as well as a high magnetic anomaly in the southwest edge of the Austral target. Assays received from bulk leach extractable gold (“BLEG”) and rock chip sampling confirms the potential for an intrusive-related mineralized system.

Japan Gold Strategic Alliance, Japan
The first phase of stream sediment and rock chip sampling over the Kitami metallogenic province of Hokkaido was completed during the fourth quarter of 2020. Ground gravity surveys were completed over four projects of the Hokusatsu region in the Southern Kyushu epithermal gold province.
A total of 650 BLEG and 1,100 rock chip samples were collected during the fourth quarter of 2020. Samples were submitted for analysis and BLEG results for the Sanru, Aibetsu and Tenyru projects were received at quarter-end and are currently being reviewed.
The initial regional assessment program of the projects within the Strategic Alliance included BLEG stream sediment sampling and rock float geochemical sampling. Geochemical sampling has been completed on 20 out of 30 Strategic Alliance projects throughout Japan. Sediment samples are being collected systematically across all project areas to define gold and pathfinder element anomalies associated with gold bearing epithermal vein
BARRICK YEAR-END 2020
57
MANAGEMENT’S DISCUSSION AND ANALYSIS


systems. Once anomalous catchments are identified, further investigation is carried out upstream along the anomalous drainages to define the point of entry of precious metals.
Gravity data has been used to assist in understanding structural controls that are favorable to gold mineralization at both the regional and project levels. Additional processing of the gravity data will enhance fault detection and support targeting of more focused geophysical surveys, together with subsequent drilling. Gravity surveying has been completed on eight out of fifteen Strategic Alliance projects in Southern Kyushu.
As results of the geophysical and geochemical programs are received, we expect to identify new highly prospective areas in the major gold provinces of Japan.
One new project was added to the Strategic Alliance during the quarter, the Kowa Project adjoining the Mizobe-Onoyama Project in Southern Kyushu.

Reunion Gold Strategic Alliance, Guiana Shield
Auger sampling was completed on the Aremu project in Guyana, and results of the 2020 field program were under review at quarter-end.
A new project has been added to the Strategic Alliance, the NW Extension project in Suriname. The project is located 60 kilometers southwest of the capital of Paramaribo, and covers the continuation of the greenstone belt under sand cover. An airborne magnetic survey is planned for early 2021.

Africa & Middle East
Bambadji, Senegal19
At Bambadji, drilling resumed after the wet season hiatus with strong results returned from the follow-up program at Kabewest. In the central part of the target, diamond drilling confirmed the extension of the hydrothermal breccia system 150 meters down-dip returning 10.5 meters at 4.24 g/t Au and 3.0 meters at 13.26 g/t Au. Step-out reverse circulation (“RC”) drilling succeeded at extending the system 250 meters further to the northeast with a good intercept of 50 meters at 2.08 g/t Au hosted both in hydrothermal breccias and limestones. Currently, two northeast striking mineralized zones have been delineated, with a more continuous zone in the east that extends over 500 meters and remains open to the north. Drilling is underway to continue developing this promising target.
A six-fence RC program is underway at Dakota to test a broad auger anomaly in the Faleme volcanics. First holes intersected multiple potential mineralized zones hosted within an altered porphyritic diorite and volcaniclastics in an area coinciding with a chargeability anomaly defined from a gradient array induced polarization survey. Results are pending.
Diamond drilling is underway at Gefa in the south of the Bambadji permit to provide lithological and structural controls at the more than five-kilometer-long shear system previously defined through RC drilling. Once the five-hole program is complete and results are received, infill RC drilling will reduce drill spacing along the strongest parts of the system. At Latifa, drilling confirmed the continuity of the system over 800 meters to the north of the target but did not succeed in delineating any high-grade shoots. Auger drilling is planned to resume in the first quarter of 2021 to test the remaining prospective gaps of the Bambadji permit.


Loulo-Gounkoto, Mali20, 21
At Loulo, framework drilling continued at the Yalea Transfer Zone South Extension, 660 meters south of the 2019 block model and 160 meters down-plunge of the drill hole intercept reported in the third quarter of 2020 (43.8 meters at 5.35 g/t Au; true width of 21.8 meters). Initial observations confirm the extension of the system and suggests that thicker and higher-grade mineralization can be expected down-dip. At Yalea Shear South, framework drilling continues ahead of wide-spaced step-out holes planned for the second quarter of 2021 to test the potential for concealed shoots south of the Transfer Zone.
At Yalea Ridge North (“YRN”), final assay results were received for the remaining two of four scout holes and include 7.2 meters at 4.93 g/t Au, 3.3 meters at 4.33 g/t Au, 5.5 meters at 3.91 g/t Au, and 7.9 meters at 1.92 g/t Au. The presence of hematite altered cataclasite and quartz-hematite veining cutting the core axis support the original target model concept of east-northeast trending mineralized fracture zones. The overall program has also confirmed the presence of bedding parallel mineralized zones. The next step at YRN is to design several optimally oriented RC drill fences to cut the trend obliquely and confirm the potential for open pit upside.
At Yalea Ridge Main (“YRM”), the initial two greenfields scout holes intersected strong zones of visible gold. YRDH010 returned assays of: 5.0 meters at 18.09 g/t Au, 8.7 meters at 7.47 g/t Au, 3.9 meters at 12.30 g/t Au, and 4.7 meters at 6.66 g/t Au. As the first and northernmost holes drilled on a prospective 900-meter strike trend, the results are encouraging, as is the abundant visible gold. The drill hole also confirms upside potential to the north of the currently defined YRM area of interest, with additional drilling required. The higher-grade zones that were intersected appear to confirm the target model concept – with brittle structures generally at a right angle to the core axis. If the subsequent holes continue to confirm the target model concept, the next phase of drilling will be planned to optimally cut the host package stratigraphy at an acute angle and confirm open pit upside.
Drilling at DB1 has continued to be hampered by a combination of poor ground conditions and drill performance with four of six holes failing to reach the target depth. Of the holes that have been completed or partially completed, DB1RC029 returned assays of 2.00 meters at 9.15 g/t Au from 268.0 meters, although the drill hole was abandoned in the mineralized zone. DB1RC027 drilled up-dip on the section and returned assays of 5.0 meters at 2.66 g/t Au from 67.0 meters, highlighting good overall upside in the southern DB1 area. The plan in the first quarter of 2021 is to extend RC drill coverage to the north and south to define the strike extents and footprint of the system. Later in 2021, geological and resource models will be compiled followed by a preliminary pit optimization to assess economics

Regional Exploration, Mali
In Mali South, integration of new field data with geophysics and geochemistry on the Diangoumerila and Mogoyafara permits highlighted prospective areas of structural complexity with suppressive regolith. These areas will be tested with auger programs in the first quarter of 2021 before initiating follow-up air core and RC drilling. Elsewhere, generative work continues in the Kenieba-Kedougou Inlier and in Mali South.


BARRICK YEAR-END 2020
58
MANAGEMENT’S DISCUSSION AND ANALYSIS


Tongon, Côte d'Ivoire22
The drill testing of targets continued with the aim of delivering potential satellite resources to extend Tongon's mine life. On the Stabilo trend, eight kilometers north of the mill, three mineralized zones were identified by following up on saprolite anomalies defined through an auger drilling program. These zones, one located at Seydou North and two at Jubula, are between 200 and 400 meters of strike length and remain open. At Seydou North, results include 13.0 meters at 1.38 g/t Au, 4.0 meters at 5.90 g/t Au and 4.0 meters at 7.69 g/t Au. At Jubula, highlight intercepts include 12.0 meters at 2.28 g/t Au, 9.0 meters at 4.14 g/t Au and 7.0 meters at 1.19 g/t Au. Infill and step-out RC drilling is planned in the first quarter of 2021.
At Zulu West, located 21 kilometers from the processing plant, RC drilling did not succeed at replicating the mineralization down-dip. However, several shallow holes returned encouraging results. Large gaps along the structure, most notably a 600-meter section in the central part of the target with ancient artisanal workings will be tested in the first quarter of 2021.

Regional Exploration, Côte d'Ivoire
Exploration at Boundiali in the fourth quarter of 2020 involved data review with some additional fieldwork to prepare for drilling. The key objective of this work was to better define the style and potential controls on higher-grade mineralization. Work included trenching to the south of the Sani target to confirm the extension of a high-grade shear. Results from this work are pending. At the centre of Sani, structural intersection lineations were interpreted between the main north-northeast trend and northeast cross-cutting structures. Trenching across this area yielded good results. Extension and step-out trenching was also undertaken at Caribou to define strike continuity and advance the target to drill stage. Results are pending. Meanwhile, detailed mapping at Kassere defined intersection lineation controls on high grades in the south of the prospect. Separately, the review of Fonondara will be conducted early in 2021. Drilling on priority targets at Boundiali is expected to continue through to mid-2021 to establish the potential for satellite resources to Tongon.
On the Sissedougou permit, two diamond holes tested Gbongogo North for an intrusive-related mineralized system similar to Gbongogo Main but with its preserved apex and potential mineralized carapace. Both holes intersected the targeted intrusive and although it is strongly albite and tourmaline altered, only weak grade is expected. Two scissor RC holes tested the Yere North intrusive target previously delineated by a trench. The holes confirmed the presence of granodiorite and a feldspar porphyry expected to be mineralized based on RC chip observations. Samples from the previous auger programs conducted at Kagon and ANV were submitted for multi-elements analysis to assist in delineating potential footprints of intrusive-related mineralization systems similar to Gbongogo Main. This data is expected to help prioritize follow-up programs to be conducted in the first quarter of 2021.
In southeast Côte d’Ivoire, the stream sediment sampling program to cover the Ketesso Shear is planned in early 2021.

Kibali and Ngayu Belt, Democratic Republic of Congo23,24
At KCD, results for the deep hole DDD603 (completed in the third quarter of 2020) were received. This hole was drilled to test the down-plunge continuity of the KCD system, 500 meters northeast of previous deep hole DDD602. DDD603 was designed to provide a geological
framework and look for evidence of continuity of the mineralizing system. The hole successfully confirmed the presence of KCD alteration corresponding to the periphery of the 9000 lode and results were better than expected. Highlight intercepts include 5.9 meters at 1.37 g/t Au from 1,368.6 meters as well as 11.5 meters at 0.99 g/t Au from 1,397.5 meters, including 2.0 meters at 2.45 g/t Au.
A drill program was initiated at Tete Bakangwe in an area characterized by extensive alteration, favorable host rocks and a similar structural setting to KCD. The drill program will also test the Pakaka middle lens mineralization located below the Pakaka main mineralized system.
At Ikamva East, an RC program was completed, testing mineralization on the sheared upper and lower contacts of a folded banded iron formation (“BIF”). Overall, results support a discontinuous zone of mineralization related to the upper BIF contact, that pinches and swells down-plunge. The upper contact includes northeast trending plunging shoots of higher grade, averaging 15 to 25 meters wide. Highlight intercepts include hole IVRC0276 returning 28.0 meters at 4.17 g/t Au, including 4.0 meters at 5.96 g/t Au and 5.0 meters at 14.03 g/t Au. Full assessment of the potential is ongoing.
At Madungu, while results from the recently completed RC program returned only anomalous values, the drilling has shown an extensive alteration system, which coupled with favorable lithologies and structural complexity, demonstrates this area deserves follow-up.
At Ngayu, drilling was completed at Mokepa with four wide-spaced holes testing a sheared east-northeast trending BIF system over a two-kilometer strike length. Positive results returned for the two holes collared 600 meters apart in the central part of the system included 9.2 meters at 1.83 g/t Au in ADDD0001 as well as 18.4 meters at 2.64 g/t Au, including 11.9 meters at 3.04 g/t Au, in ADDD0002. Two additional holes seeking extensions returned only weak mineralization, indicating the system weakens or controlling structures are not oriented parallel to the lithologies (the BIF/volcanic rocks contact).

North Mara, Bulyanhulu and Buzwagi, Tanzania
All historic drilling at the North Mara district has been logged and sampled for multi-element geochemistry. Results have identified prospective geology, alteration and pathfinder element enrichment beneath extensive phonolite cover to validate several new greenfields targets along the Gokona Trend, Mara Shear and associated cross structures. Of these, Conjunction and Shakta have progressed through target-scale fieldwork that includes mapping and soil sampling and are drill-ready for the first quarter of 2021. Scout drilling at Kofia was completed and showed a decrease in hydrothermal alteration intensity, changes to the host sequence with significantly less andesitic porphyry and wider intervals of mafic schist compared to Gokona, 800 meters to the east. Drilling intersected narrow zones of sub-economic mineralization and the exploration focus has now moved further along strike to new greenfields targets. Field teams are exploring five greenfields areas of interest at North Mara, while a review and deposit-scale geologic model update commences at Rama to identify near-mine upside opportunities in the first half of 2021.
At Bulyanhulu, field mapping has validated three priority greenfields targets located two kilometers northeast of Reef 2, with a combined prospective strike length of six kilometers. Folding of a thick ash tuff unit flanked by basalt and mafic rocks to the northeast and an intercalated
BARRICK YEAR-END 2020
59
MANAGEMENT’S DISCUSSION AND ANALYSIS


sequence of gabbros and argillites to the southwest provides look-alike geologic settings to Reef 1 at the Pacha target and Reef 2 at the Ndovu/Madini targets, respectively. Widespread cover of alluvium and Mbuga lacustrine sediments has also preserved exploration potential. Going forward, geochemical sampling and scout drilling are being motivated to advance these targets in early 2021.

Jabal Sayid, Kingdom of Saudi Arabia
At Jabal Sayid, the drill program is on track to convert additional inferred resource into the life of mine plan. It continues to highlight extension opportunities at the known lodes and to outline new potential at greenfields targets.
Building on the exploration success in the third quarter of 2020, surface and underground drilling has recommenced at Lode 1. The drill targets include extensions to known mineralization as well as a conceptual feeder to the Lode 1 massive sulfide. Initial results from
metallurgical studies have been received, highlighting economic copper recoveries with final results expected in the first quarter of 2021.
At Lode 4 East, the program is infill drilling a 125-meter strike extension to the high-grade Lode 4 feeder, in order to upgrade inferred ounces and bring them into the life of mine plan. Early indications for this zone support the development of new underground infrastructure. Underground drilling at Lodes 2 and 4 continues to extend mineralization and further develop the geological model.
Promising Volcanogenic Massive Sulfide (“VMS”)-style alteration and mineralization has been intersected in maiden drillholes at the South and East Gossan targets. Significant drill gaps have been identified along the target palaeosurface (chert) associated with the known lodes. A down-hole geophysical survey to ascertain conductive responses to mineralization at these targets has been planned for the first quarter of 2021.




BARRICK YEAR-END 2020
60
MANAGEMENT’S DISCUSSION AND ANALYSIS


REVIEW OF FINANCIAL RESULTS

Revenue
($ millions, except per ounce/pound data in dollars) For the three months ended For the years ended
   12/31/20 9/30/20 12/31/20 12/31/19 12/31/18
Gold
000s oz solda
1,186  1,249  4,879  5,467  4,544 
000s oz produceda
1,206  1,155  4,760  5,465  4,527 
Market price
($/oz)
1,874  1,909  1,770  1,393  1,268 
Realized price ($/oz)b
1,871  1,926  1,778  1,396  1,270 
Revenue
3,028  3,237  11,670  9,186  6,600 
Copper
millions lbs solda
108  116  457  355  382 
millions lbs produceda
119  103  457  432  383 
Market price
($/lb)
3.25  2.96  2.80  2.72  2.96
Realized price ($/lb)b
3.39  3.28  2.92  2.77  2.88
Revenue
195  219  697  393  512 
Other sales 56  84  228  138  131 
Total revenue 3,279  3,540  12,595  9,717  7,243 
a.Includes North Mara, Bulyanhulu and Buzwagi on a 84% basis starting January 1, 2020 (and on a 63.9% basis from January 1, 2018 to September 30, 2019; notwithstanding the completion of the Acacia transaction on September 17, 2019, we consolidated our interest in Acacia and recorded a non-controlling interest of 36.1% in the income statement for the entirety of the third quarter of 2019 as a matter of convenience; and on a 100% basis from October 1, 2019 to December 31, 2019), Pueblo Viejo on a 60% basis, South Arturo on a 36.9% basis from July 1, 2019 onwards as a result of the contribution to Nevada Gold Mines (and on a 60% basis from January 1, 2018 to June 30, 2019), and Veladero on a 50% basis, which reflects our equity share of production and sales. Commencing on January 1, 2019, the effective date of the Merger, also includes Loulo-Gounkoto on an 80% basis, Kibali on a 45% basis, Tongon on an 89.7% basis, and Morila on a 40% basis until the second quarter of 2019. Also removes the non-controlling interest of 38.5% Nevada Gold Mines from July 1, 2019 onwards. Copper pounds include our equity share of Zaldívar and Jabal Sayid.
b.Realized price is a non-GAAP financial performance measure with no standardized meaning under IFRS and therefore may not be comparable to similar measures of performance presented by other issuers. For further information and a detailed reconciliation of each non-GAAP measure used in this section of the MD&A to the most directly comparable IFRS measure, please see pages 96 to 122 of this MD&A.

Both 2020 gold and copper production of 4.8million ounces and 457 million pounds, respectively, were within the guidance ranges of 4.6 to 5.0 million ounces and 440 to 500 million pounds, respectively.

Q4 2020 compared to Q3 2020
In the fourth quarter of 2020, gold revenues decreased by 6% compared to the third quarter of 2020 primarily due to a lower realized gold price4, combined with lower sales volume. The average market price for the three-month period ended December 31, 2020 was $1,874 per ounce versus $1,909 per ounce for the prior quarter. During the fourth quarter of 2020, the gold price ranged from $1,765 per ounce to $1,966 per ounce and closed the quarter at
$1,888 per ounce. Gold prices in the quarter continued to be volatile as a result of impacts relating to the Covid-19 pandemic, including the progress of vaccine approvals and distribution, as well as the fiscal and monetary stimulus measures put in place by governments and central banks around the globe.

ATTRIBUTABLE GOLD PRODUCTION VARIANCE (000s oz)
Q4 2020 compared to Q3 2020

qgoldprod1a.jpg

In the fourth quarter of 2020, attributable gold production was 51 thousand ounces higher than the prior quarter, primarily due to a strong performance from Pueblo Viejo, the ramp-up of mining operations at Bulyanhulu, ongoing improvement at Turquoise Ridge and an improved irrigation strategy at Veladero. Gold sales volume was lower than the prior quarter primarily due to the export of the remaining stockpiled concentrate in Tanzania occurring in the prior quarter.
Copper revenues in the fourth quarter of 2020 decreased by 11% compared to the prior quarter, primarily due to lower copper sales volume, partially offset by a higher realized copper price4. The average market price in the fourth quarter of 2020 was $3.25 per pound versus $2.96 per pound in the prior quarter. In both the fourth quarter of 2020 and the prior quarter, the realized copper price4 was higher than the market copper price as a result of the impact of positive provisional pricing adjustments recorded. During the fourth quarter of 2020, the copper price ranged from $2.84 per pound to $3.64 per pound and closed the quarter at $3.51 per pound. Copper prices in the fourth quarter of 2020 were positively influenced by economic optimism following the approval of Covid-19 vaccines, the potential for further fiscal and monetary stimulus measures, a weakening US dollar and low copper stockpiles.
Attributable copper production in the fourth quarter of 2020 increased by 16 million pounds compared to the prior quarter, primarily driven by higher production at Lumwana following completion of plant maintenance in the
BARRICK YEAR-END 2020
61
MANAGEMENT’S DISCUSSION AND ANALYSIS


prior quarter. Copper sales were lower than the prior quarter, primarily due to the timing of shipments at Lumwana.

2020 compared to 2019
In 2020, gold revenues increased by 27% compared to the prior year, primarily due to the impact of recording a full year of production from Nevada Gold Mines, which was formed on July 1, 2019, and is consolidated and included in revenue at 100%. Excluding the impact of Nevada Gold Mines, gold revenues increased by 12% compared to the prior year resulting from a higher realized gold price4, partially offset by lower sales volume. The average market gold price for 2020 was $1,770 per ounce versus $1,393 per ounce in the prior year.
In 2020, attributable gold production was 4,760 thousand ounces, or 705 thousand ounces lower than the prior year. Excluding the impact of the formation of Nevada Gold Mines, gold production for the year decreased by 1,091 thousand ounces or 22%, mainly due to lower grades mined and processed at Cortez as mining from CHOP was completed in the second quarter of 2019, Porgera entering care and maintenance on April 25, 2020, and the sale of our 50% interest in Kalgoorlie on November 28, 2019. Gold production was further impacted by the exclusion of Golden Sunlight and Morila after the second quarter of 2019 and Lagunas Norte after the third quarter of 2019 from our production calculation upon entering care and maintenance, as well as the impact of the Covid-19 pandemic at Veladero, where movement and social distancing restrictions slowed the remobilization of employees and contractors back to site after quarantine restrictions were lifted in April 2020. Gold sales were higher than gold production in 2020 following the re-commencement of exports of concentrate stockpiled in Tanzania, which was completed in the third quarter of 2020.

ATTRIBUTABLE GOLD PRODUCTION VARIANCE (000s oz)
Year ended December 31, 2020

ytdgoldprod1a.jpg

Copper revenues for 2020 were up 77% compared to the prior year due to higher copper sales volume and a higher realized copper price4. In both 2020 and 2019, the realized
copper price4 was higher than the market copper price as a result of positive provisional pricing adjustments to copper sales that were subject to finalization in 2020.
Attributable copper production for 2020 was 25 million pounds higher than the prior year, mainly due to Lumwana, as production in the prior year was impacted by repeated tears to the main crusher conveyor and the subsequent use of lower grade stockpile material to supplement mill feed.

Production Costs
($ millions, except per ounce/pound data in dollars) For the three months ended For the years ended
   12/31/20 9/30/20 12/31/20 12/31/19 12/31/18
Gold
Direct mining costsa
1,069  1,151  4,421  4,274  3,130
Depreciation 495  508  1,975  1,902  1,253
Royalty expense 107  103  410  308  196
Community relations 10  26  30  42
Cost of sales 1,681  1,768  6,832  6,514  4,621
Cost of sales
($/oz)b
1,065  1,065  1,056  1,005  892
Total cash costs ($/oz)c
692  696  699  671  588
All-in sustaining costs ($/oz)c
929  966  967  894  806
Copper
Direct mining costs 68  76  292  224  344
Depreciation 41  61  208  100  170
Royalty expense 16  16  54  34  39
Community relations 0  2  5
Cost of sales 125  154  556  361  558
Cost of sales
($/lb)b
2.06  1.97  2.02  2.14  2.40
C1 cash costs ($/lb)c
1.61  1.45  1.54  1.69  1.97
All-in sustaining costs ($/lb)c
2.42  2.31  2.23  2.52  2.82
a.Includes mining and processing costs.
b.Cost of sales applicable to gold per ounce is calculated using cost of sales applicable to gold on an attributable basis (removing the non-controlling interest of 40% Pueblo Viejo, 16% North Mara, Bulyanhulu and Buzwagi starting January 1, 2020, the date the GoT’s 16% free carried interest was made effective (36.1% from January 1, 2018 to September 30, 2019; notwithstanding the completion of the Acacia transaction on September 17, 2019, we consolidated our interest in Acacia and recorded a non-controlling interest of 36.1% in the income statement for the entirety of the third quarter of 2019 as a matter of convenience); and 63.1% South Arturo from cost of sales from July 1, 2019 onwards as a result of its contribution to Nevada Gold Mines (and on a 40% basis from January 1, 2018 to June 30, 2019), divided by attributable gold ounces. Commencing January 1, 2019, the effective date of the Merger, the non-controlling interest of 20% Loulo-Gounkoto and 10.3% Tongon is also removed from cost of sales and our proportionate share of cost of sales attributable to equity method investments (Kibali, and Morila until the second quarter of 2019) is included. Cost of sales applicable to gold per ounce also removes the non-controlling interest of 38.5% Nevada Gold Mines from July 1, 2019
BARRICK YEAR-END 2020
62
MANAGEMENT’S DISCUSSION AND ANALYSIS


onwards. Cost of sales applicable to copper per pound is calculated using cost of sales applicable to copper including our proportionate share of cost of sales attributable to equity method investments (Zaldívar and Jabal Sayid), divided by consolidated copper pounds (including our proportionate share of copper pounds from our equity method investments).
c.Total cash costs, C1 cash costs and all-in sustaining costs are non-GAAP financial performance measures with no standardized meaning under IFRS and therefore may not be comparable to similar measures of performance presented by other issuers. For further information and a detailed reconciliation of each non-GAAP measure used in this section of the MD&A to the most directly comparable IFRS measure, please see pages 96 to 122 of this MD&A.

Q4 2020 compared to Q3 2020
In the fourth quarter of 2020, cost of sales applicable to gold was 5% lower compared to the third quarter of 2020 as a result of lower sales volume. Our 45% interest in Kibali and 40% interest in Morila are equity accounted for and we therefore do not include their cost of sales in our consolidated gold cost of sales. On a per ounce basis, cost of sales applicable to gold5, after including our proportionate share of cost of sales at our equity method investees, and total cash costs4 were in line with and 1% lower, respectively, than the prior quarter, primarily due to a higher proportion of lower-cost stockpiled ore in the feed mix at Carlin, largely offset by lower grades at Loulo-Gounkoto and North Mara.
In the fourth quarter of 2020, gold all-in sustaining costs4 decreased by 4% on a per ounce basis compared to the prior quarter primarily due to lower minesite sustaining capital expenditures, combined with slightly lower total cash costs per ounce4.
In the fourth quarter of 2020, cost of sales applicable to copper was 19% lower than the prior quarter primarily due to lower copper sales volume as a result of the timing of shipments at Lumwana. Our 50% interests in Zaldívar and Jabal Sayid are equity accounted for and we therefore do not include their cost of sales in our consolidated copper cost of sales. On a per pound basis, cost of sales applicable to copper5 and C1 cash costs4, after including our proportionate share of cost of sales at our equity method investees, increased by 5% and 11%, respectively, compared to the prior quarter primarily due to additional costs recognized in relation to the settlement of labor contract negotiations at Zaldívar.
In the fourth quarter of 2020, copper all-in sustaining costs4, which have been adjusted to include our proportionate share of equity method investees, were 5% higher per pound than the prior quarter primarily reflecting higher C1 cash costs4, partially offset by lower minesite sustaining capital expenditures.

2020 compared to 2019
In 2020, cost of sales applicable to gold was 5% higher than the prior year primarily due to the impact of a full year of operation at Nevada Gold Mines, which was formed on July 1, 2019, and is consolidated and included in cost of sales at 100%. Excluding the impact of Nevada Gold Mines, cost of sales applicable to gold was 9% lower compared to the prior year, mainly due to decreased sales volume. On a per ounce basis, cost of sales applicable to gold5, after including our proportionate share of cost of sales at our equity method investees, and total cash costs per ounce4 were 5% and 4% higher, respectively, than the prior year, primarily due to the lower average grade processed at Cortez and the sales mix changes upon the formation of Nevada Gold Mines, which has resulted in a
higher proportion of gold sourced from lower-grade open pits.
In 2020, gold all-in sustaining costs per ounce4 increased by 8% compared to the prior year primarily due to higher total cash costs per ounce4, combined with higher minesite sustaining capital expenditures.
In 2020, cost of sales applicable to copper was 54% higher than the prior year, primarily due to higher sales volumes at Lumwana, as sales in the prior year were negatively impacted by a major refurbishment at one of the third-party smelters that processes a portion of Lumwana’s concentrate. Our 50% interests in Zaldívar and Jabal Sayid are equity accounted for and therefore we do not include their cost of sales in our consolidated copper cost of sales. On a per pound basis, cost of sales applicable to copper5 and C1 cash costs4, after including our proportionate share of cost of sales at our equity method investees, decreased by 6% and 9%, respectively, compared to the prior year, primarily due to the improved feed grade, decreased mining costs as well as lower general and administrative expenses, and lower concentrate marketing costs at Lumwana.
Copper all-in sustaining costs per pound4 were 12% lower than the prior year primarily reflecting the lower total C1 cash costs per pound4, combined with lower minesite sustaining capital expenditures on a per pound basis.

2020 compared to Guidance
2020 cost of sales applicable to gold5 was $1,056 per ounce, slightly higher than our guidance range of $980 to $1,030 per ounce, mainly due to higher royalty expense resulting from the impact of a higher realized gold price4 and higher depreciation expense following an impairment reversal recorded in the first quarter of 2020.
Gold total cash costs4 and all-in sustaining costs4 for 2020 were $699 and $967 per ounce, respectively, both within the guidance ranges of $650 to $700 and $920 to $970 per ounce, respectively. These per ounce costs would have been at the lower end of the guidance range after adjusting for the impact of the higher realized gold price4 on royalty expense as 2020 guidance was based on a gold price assumption of $1,350 per ounce.
2020 cost of sales applicable to copper5 was $2.02 per pound, below our guidance range of $2.10 to $2.40 per pound, mainly due to lower depreciation. C1 cash costs4 were $1.54 per pound, at the lower end of our guidance range of $1.50 to $1.80 per pound.
2020 copper all-in sustaining costs4 were $2.23 per pound, at the lower end of our guidance range of $2.20 to $2.50 per pound.
BARRICK YEAR-END 2020
63
MANAGEMENT’S DISCUSSION AND ANALYSIS


Capital Expendituresa
($ millions) For the three months ended For the years ended
   12/31/20 9/30/20 12/31/20 12/31/19 12/31/18
Minesite sustainingb
354  415  1,559 1,320  968 
Project capital expendituresc
184  126  471 370  425 
Capitalized interest 8  24 11 
Total consolidated capital expenditures 546  548  2,054 1,701  1,400 
Attributable capital expendituresd
445  436  1,651 1,512  1,363
2020 Attributable capital expenditures guidanced
$1,600
to
$1,900
a.These amounts are presented on a 100% cash basis, except for attributable capital expenditures.
b.Includes both minesite sustaining and mine development.
c.Project capital expenditures (on an accrued basis until December 31, 2018, and on a cash basis thereafter) are included in our calculation of all-in costs, but not included in our calculation of all-in sustaining costs.
d.These amounts are presented on the same basis as our guidance and include our 60% share of Pueblo Viejo, 60% share of South Arturo (36.9% of South Arturo from July 1, 2019 onwards as a result of its contribution to Nevada Gold Mines), our 84% share of North Mara, Bulyanhulu and Buzwagi starting January 1, 2020, the date the GoT’s 16% free carried interest was made effective (63.9% share from January 1, 2018 until September 30, 2019; notwithstanding the completion of the Acacia transaction on September 17, 2019, we consolidated our interest in Acacia and recorded a non-controlling interest of 36.1% in the income statement for the entirety of the third quarter of 2019 as a matter of convenience, and our 100% share from October 1, 2019 to December 31, 2019) and our 50% share of Zaldívar and Jabal Sayid. Commencing January 1, 2019, the effective date of the Merger, also includes our 80% share of Loulo-Gounkoto, 89.7% share of Tongon, 45% share of Kibali and 40% share of Morila until the second quarter of 2019. Starting July 1, 2019, it also includes our 61.5% share of Nevada Gold Mines.

Q4 2020 compared to Q3 2020
In the fourth quarter of 2020, total consolidated capital expenditures on a cash basis remained consistent with the third quarter of 2020, mainly due to a decrease in minesite sustaining capital expenditures, offset by higher project capital expenditures. Minesite sustaining capital expenditures decreased by 15% compared to the prior quarter, primarily due to Loulo-Gounkoto and was driven by lower capitalized stripping at the Gounkoto open pit and a decrease in capital development at Loulo. This was combined with a decrease at Cortez as a result of fewer haul truck component replacements, the ramp-down of the Crossroads dewatering project until the next stages are reviewed and approved, and a reduction in capitalized stripping as the mine transitions out from a mostly stripping phase at Crossroads Phase 4. Project capital expenditures increased by 46% primarily due to the plant and tailings expansion project at Pueblo Viejo and the restart of underground mining and processing operations at Bulyanhulu.

2020 compared to 2019
In 2020, total consolidated capital expenditures on a cash basis increased by 21% compared to the prior year, primarily due to the impact of the sites acquired as part of
the formation of Nevada Gold Mines on July 1, 2019, which is consolidated and included at 100%. Excluding the impact of the formation of Nevada Gold Mines, capital expenditures increased by 14%, mainly due to higher minesite sustaining capital expenditures as a result of increased capitalized stripping at Loulo-Gounkoto and our investment in the tailings storage facility and other water management initiatives at North Mara. This was combined with higher project capital expenditures related to the plant and tailings expansion project at Pueblo Viejo and the restart of underground mining and processing operations at Bulyanhulu.

2020 compared to Guidance
Attributable capital expenditures for 2020 of $1,651 were at the lower end of the guidance range of $1,600 to $1,900 million with lower minesite sustaining capital expenditures offset by higher project capital expenditures. Certain minesite sustaining capital expenditures previously expected to be incurred in 2020 were deferred until 2021 due to the impact of the Covid-19 pandemic.

General and Administrative Expenses 
($ millions) For the three months ended For the years ended 
    12/31/20 9/30/20 12/31/20 12/31/19 12/31/18
Corporate administrationa
32  22  118 148  212 
Share-based compensationb
(8) 28  67 37  27 
Tanzaniac
0  0 27  26 
General & administrative expenses 24  50  185 212  265 
2020 General & administrative expenses guidance ~$170
a.For the three months and year ended December 31, 2020, corporate administration costs include approximately $nil and $nil, respectively, of severance costs (September 30, 2020: $nil; 2019 $18 million; 2018: $63 million).
b.Based on US$22.78 share price as at December 31, 2020 (September 30, 2020: US$28.11; 2019: US$18.59; 2018: $13.54) and excludes share-based compensation relating to Tanzania.
c.Formerly known as Acacia Mining plc.

Q4 2020 compared to Q3 2020
In the fourth quarter of 2020, general and administrative expenses decreased by $26 million compared to the third quarter of 2020 primarily due to lower share-based compensation. The remeasurement of our share-based compensation liability during the current quarter resulted in a gain due to the decrease in our share price from the prior quarter.

2020 compared to 2019
General and administrative expenses decreased by $27 million compared to the prior year due to lower corporate administration expenses attributed to business simplification, improved contract management as well as lower travel and office costs as a result of the Covid-19 pandemic. This was combined with lower expenses related to our Tanzania assets following the closure of Acacia Mining Plc’s London and Johannesburg offices near the end of the third quarter of 2019. This was partially offset by
BARRICK YEAR-END 2020
64
MANAGEMENT’S DISCUSSION AND ANALYSIS


higher share-based compensation expense as a result of our higher share price.

2020 compared to Guidance
General and administrative expenses were slightly higher than guidance of ~$170 million. Corporate administration expenses of $118 million were below guidance of ~$130 million, highlighting the continued benefit of our cost reduction activities, while share-based compensation expense of $67 million was higher than guidance of ~$40 million, resulting from the increase in our share price.

Exploration, Evaluation and Project Costs
($ millions) For the three months ended For the years ended
    12/31/20 9/30/20 12/31/20 12/31/19 12/31/18
Global exploration and evaluation 31  34  143 143  121 
Project costs:
Pascua-Lama 11  37 49  77 
   Other 10  27 20  36
Corporate development 0  9 51  60 
Business improvement and innovation 0  0 10  44 
Global exploration and evaluation and project expense 52  53  216 273  338 
Minesite exploration and evaluation 22  19  79 69  45 
Total exploration, evaluation and project expenses 74  72  295 342  383 
2020 total E&E and project expenses guidance $280
to
$320

Q4 2020 compared to Q3 2020
Exploration, evaluation and project expenses for the fourth quarter of 2020 were in line with the prior quarter.

2020 compared to 2019
Exploration, evaluation and project costs for 2020 decreased by $47 million compared to the prior year, primarily due to lower corporate development costs as the prior year included transaction costs related to the formation of Nevada Gold Mines and the Acacia transaction. This was combined with lower business improvement and innovation costs incurred at the corporate level and lower Pascua-Lama project costs, partially offset by higher minesite exploration and evaluation expenses.

2020 compared to Guidance
Exploration, evaluation and project expenses for 2020 of $295 million were below the midpoint of the guidance range of $280 to $320 million.

Finance Costs, Net
($ millions) For the three months ended For the years ended
    12/31/20 9/30/20 12/31/20 12/31/19 12/31/18
Interest expensea
82  88  342 435  452
Accretion 8  41 75  87
Loss on debt extinguishment 0  15 29
Interest capitalized (8) (7) (24) (14) (9)
Other finance costs 4  (3) 1 1
Finance income (6) (6) (28) (31) (15)
Finance costs, net 80  81  347 469  545
2020 finance costs, net guidance $400
to
$450
a.For the three months and year ended December 31, 2020, interest expense includes approximately $9 million and $34 million, respectively, of non-cash interest expense relating to the gold and silver streaming agreements with Wheaton and Royal Gold, Inc. (September 30, 2020: $8 million; 2019: $103 million; 2018: $98 million).

Q4 2020 compared to Q3 2020
In the fourth quarter of 2020, finance costs, net were in line with the prior quarter.

2020 compared to 2019
In 2020, finance costs, net were 26% lower than the prior year, primarily due to a decrease in interest expense attributed to the absence of non-cash interest expense on the silver streaming agreement at Pascua-Lama, following the de-recognition of the deferred revenue liability at the end of the fourth quarter of 2019. This was combined with lower accretion expense resulting from a decrease in interest rates and was partially offset by a loss on debt extinguishment relating to the make-whole repurchase in January 2020 of the remaining $337 million of principal on our 3.85% notes due 2022.

2020 compared to Guidance
Finance costs, net for 2020 of $347 million were below the guidance range of $400 to $450 million, mainly due to lower accretion expense resulting from a decrease in interest rates and higher interest capitalized.

BARRICK YEAR-END 2020
65
MANAGEMENT’S DISCUSSION AND ANALYSIS


Additional Significant Statement of Income Items
($ millions) For the three months ended For the years ended
    12/31/20 9/30/20 12/31/20 12/31/19 12/31/18
Impairment charges (reversals) 40  (269) (1,423) 900 
Loss on currency translation 16  16  50  109  136 
Other expense (income) (138) (78) (178) (3,100) (90)

Impairment Charges (Reversals)
($ millions) For the three months ended For the years ended
    12/31/20 9/30/20 12/31/20 12/31/19 12/31/18
    Post-tax
(our share)
Post-tax
(our
share)
Post-tax
(our
share)
Post-tax
(our
share)
Post-tax
(our
share)
Asset impairments (reversals)
Tanzania 20  (91) 0
Nevada Gold Mines 6  6  48  11
Pueblo Viejo 0  2  (277) 0
Pascua-Lama 0  0  296  (7)
Lumwana 0  0  (663) 0
Lagunas Norte 0  0  12  405
Veladero 0  0  160
Equity method investments 0  0  30
Acacia exploration sites 0  0  17
Other 0  15  14  29
Total asset impairment charges (reversals) 26  (68) (568) 645
 Goodwill
Veladero 0  0  154
Total goodwill impairment charges 0  0  154
Tax effects and NCI 14  (201) (855) 101
Total impairment charges (reversals) 40   (269) (1,423) 900

Impairment Charges (Reversals)
Q4 2020 compared to Q3 2020
In the fourth quarter of 2020, net impairment charges were $26 million (net of tax and non-controlling interests) compared to $2 million (net of tax and non-controlling interests) in the prior quarter. The net impairment charge in the fourth quarter of 2020 mainly relates to a $20 million (net of tax and non-controlling interests) impairment at Tanzania. We recorded no significant impairment charges or reversals in the prior quarter.

2020 compared to 2019
In 2020, we recognized $68 million (net of tax and non-controlling interests) of net impairment reversals for non-current assets. This was mainly due to a net impairment reversal at Tanzania of $91 million net of tax ($304 million pre-tax and non-controlling interest) resulting from the agreement with the GoT being made effective in the first quarter of 2020. This compares to net impairment reversals of $568 million (net of tax and non-controlling interests) in 2019 mainly due to a net impairment reversal at Lumwana as a result of performance improvements reflected in the life of mine plan, and an increase in the long-term copper price assumption, as well as at Pueblo Viejo reflecting progress on the process plant expansion and additional tailings facility in conjunction with the increase in the long-term gold price assumption, partially offset by an impairment charge at Pascua-Lama as we concluded that we do not have a plan that meets our investment criteria under our current assumptions.
Refer to note 21 to the Financial Statements for a full description of impairment charges, including pre-tax amounts and sensitivity analysis.

Loss on Currency Translation
Q4 2020 compared to Q3 2020
Loss on currency translation in the fourth quarter of 2020 was in line with the prior quarter. In the current quarter, the losses mainly relate to unrealized foreign currency translation losses from the depreciation of the Argentine peso. In the prior quarter, the losses related to unrealized foreign currency translation losses result from the depreciation of the Zambian kwacha. Fluctuations in these currencies versus the US dollar revalue our peso and kwacha denominated value-added tax receivable balances.

2020 compared to 2019
Loss on currency translation for 2020 was $50 million compared to $109 million in the prior year. The losses in both years relate to unrealized foreign currency losses from the Argentine peso and the Zambian kwacha. Fluctuations in these currencies versus the US dollar revalue our peso and kwacha denominated value-added tax receivable balances. The Argentine peso and Zambian kwacha each weakened against the US dollar due in part to high inflation and economic uncertainty in both countries.

Other Expense (Income)
Q4 2020 compared to Q3 2020
In the fourth quarter of 2020, other income was $138 million compared to $78 million in the prior quarter. Other income in the fourth quarter of 2020 mainly relates to a gain on the sale of Eskay Creek of $59 million, a gain on the sale of Morila of $27 million, and a gain on the sale of Bullfrog of $22 million. Refer to note 4 to the Financial Statements for more information. In the third quarter of 2020, other income primarily related to a gain of $104 million on the remeasurement of the residual cash liability relating to our silver sale agreement with Wheaton.

2020 compared to 2019
Other income was $178 million in 2020 compared to $3,100 million in the prior year. In 2020, we recognized gains of $180 million, mainly relating to a gain on the sale of Eskay Creek of $59 million, a gain on the sale of Massawa of $54 million, a gain on the sale of Morila of $27 million, and a
BARRICK YEAR-END 2020
66
MANAGEMENT’S DISCUSSION AND ANALYSIS


gain on the sale of Bullfrog of $22 million. Refer to note 4 to the Financial Statements for more information. This was combined with a gain of $104 million on the remeasurement of the residual cash liability relating to our silver sale agreement with Wheaton. This was partially offset by care and maintenance expenses at Porgera of $51 million and donations made to our host communities relating to the Covid-19 pandemic. In 2019, other income mainly relates to a gain of $1,886 million from the remeasurement of Barrick’s 75% interest in Turquoise Ridge to fair value as a result of its contribution to Nevada Gold Mines, and a $628 million gain on the de-recognition of the deferred revenue liability relating to our silver sale agreement with Wheaton. This was further impacted by a gain of $408 million resulting from the sale of our 50% interest in Kalgoorlie, and a gain of $216 million on a settlement of customs duty and indirect taxes at Lumwana.
For a further breakdown of other expense (income), refer to note 9 to the Financial Statements.

Income Tax Expense
Income tax expense was $1,332 million in 2020. The unadjusted effective income tax rate for 2020 was 27% of the income before income taxes.
The underlying effective income tax rate on ordinary income for 2020 was 27% after adjusting for the gain on sale of long-lived assets; the impact of the framework agreement for the resolution of all outstanding disputes with the GoT; the impact of impairment charges/reversals; the impact of the transfer of a free carried shareholding of 16% in each of the Tanzania mines to the GoT; the impact of foreign currency translation losses on deferred tax balances; the impact of the recognition and de-recognition of deferred tax assets; the impact of non-deductible foreign exchange losses; the impact of a reduced corporate tax rate in Argentina on deferred tax balances; the impact of Covid-19 donations; the impact of the Porgera mine being placed on care and maintenance; the impact of the remeasurement of our residual cash liability on the silver sale agreement with Wheaton; and the impact of other expense adjustments.
We record deferred tax charges or credits if changes in facts or circumstances affect the estimated tax basis of assets and therefore the amount of deferred tax assets or liabilities to reflect changing expectations in our ability to realize deferred tax assets. The interpretation of tax regulations and legislation and their application to our business is complex and subject to change. We have significant amounts of deferred tax assets, including tax loss carry forwards, and also deferred tax liabilities. We also have significant amounts of unrecognized deferred tax assets (e.g. for tax losses in Canada). Potential changes in any of these amounts, as well as our ability to realize deferred tax assets, could significantly affect net income or cash flow in future periods.
Reconciliation to Canadian Statutory Rate
For the years ended 12/31/20 12/31/19
At 26.5% statutory rate 1,311  1,684 
Increase (decrease) due to:
Allowances and special tax deductionsa
(151) (129)
Impact of foreign tax ratesb
(32) (264)
Expenses not tax deductible 154  78 
Impairment charges not recognized in deferred tax assets 0  45 
Net currency translation (gains) losses on deferred tax balances (19) 43 
Tax impact from pass-through entities and equity accounted investments (309) (140)
Current year tax (gains) losses not recognized (9)
Sale of 50% interest in Kalgoorlie 0  12 
Recognition and de-recognition of deferred tax assets (61)
Adjustments in respect of prior years (53) (13)
Increase to income tax related contingent liabilities 42  21 
Impact of tax rate changes 1  (35)
Withholding taxes 100  54 
Mining taxes 383  412 
Tax impact of amounts recognized within accumulated OCI (21)
Other items (4)
Income tax expense 1,332   1,783 
a.We are able to claim certain allowances, incentives and tax deductions unique to extractive industries that result in a lower effective tax rate.
b.We operate in multiple foreign tax jurisdictions that have tax rates different than the Canadian statutory rate.

The more significant items impacting income tax expense in 2020 and 2019 include the following:

Currency Translation
Deferred tax balances are subject to remeasurement for changes in currency exchange rates each period. This is required in countries where tax is paid in local currency and accounts are prepared in local GAAP. The most significant balances are Argentine and Malian net deferred tax liabilities. In 2020 and 2019, a tax recovery of $19 million and tax expense of $75 million, respectively, arose from translation losses and gains on tax balances due to the weakening of the Argentine peso and strengthening of the West African CFA franc, against the US dollar. These net translation gains (losses) are included within deferred income tax recovery (expense).

Withholding Taxes
In 2020, we have recorded $87 million of dividend withholding taxes related to the distributed earnings of our subsidiaries in Cote d'Ivoire, Tanzania and the United States.

Nevada Gold Mines
Nevada Gold Mines is a limited liability company treated as a flow through partnership for US tax purposes. The partnership is not subject to federal income tax directly, but each of its partners is liable for tax on its share of the profits of the partnership. As such, Barrick accounts for its current and deferred income tax associated with the investment (61.5% share) following the principles in IAS 12. Nevada
BARRICK YEAR-END 2020
67
MANAGEMENT’S DISCUSSION AND ANALYSIS


Gold Mines is also subject to Net Proceeds of Minerals tax in Nevada, which is included on a consolidated basis in the Company's consolidated statements of income.

Tanzania
On January 24, 2020, Barrick formalized the establishment of a joint venture between Barrick and the GoT and resolution of all outstanding disputes between Barrick and the GoT, including the lifting of the previous concentrate export ban, effective immediately. Refer to note 21 to the Financial Statements for further information.
A current tax expense and deferred tax recovery of $20 million and $43 million, respectively, was recorded in 2020, largely to reflect the terms of the framework agreement with the GoT. Additionally, a $40 million deferred tax recovery was recorded due to the recognition of deferred tax assets at Buzwagi.





Financial Condition Review      
Summary Balance Sheet and Key Financial Ratios    
($ millions, except ratios and share amounts)
As at December 31 2020  2019  2018 
Total cash and equivalents 5,188  3,314  1,571 
Current assets 2,955  3,573  2,407 
Non-current assets 38,363  37,505  18,653 
Total Assets 46,506  44,392  22,631 
Current liabilities excluding short-term debt 2,200  2,001  1,625 
Non-current liabilities excluding long-term debta
7,441  7,028  5,883 
Debt (current and long-term) 5,155  5,536  5,738 
Total Liabilities 14,796  14,565  13,246 
Total shareholders’ equity 23,341  21,432  7,593 
Non-controlling interests 8,369  8,395  1,792 
Total Equity 31,710  29,827  9,385 
Total common shares outstanding (millions of shares)b
1,778  1,778  1,168 
Key Financial Ratios:      
   Current ratioc
3.67:1 2.90:1 2.38:1
  Debt-to-equityd
0.16:1 0.19:1 0.61:1
a.Non-current financial liabilities as at December 31, 2020 were $5,486 million (2019: $5,559 million; 2018: $6,201 million).
b.Total common shares outstanding does not include 0.1 million stock options.
c.Represents current assets (excluding assets held-for-sale) divided by current liabilities (including short-term debt and excluding liabilities held-for-sale) as at December 31, 2020, December 31, 2019 and December 31, 2018.
d.Represents debt divided by total shareholders’ equity (including minority interest) as at December 31, 2020, December 31, 2019, and December 31, 2018.


Balance Sheet Review
Total assets were $46.5 billion at December 31, 2020, approximately $2.1 billion higher than at December 31, 2019, primarily reflecting the strong cash flow from operating activities and the non-current asset impairment reversal of $709 million of our Tanzanian assets resulting from the agreement with the GoT being signed and made effective in the first quarter of 2020.
Our asset base is primarily comprised of non-current assets such as property, plant and equipment and goodwill, reflecting the capital-intensive nature of the mining business and our history of growth through acquisitions. Other significant assets include production inventories, indirect taxes recoverable and receivable, concentrate sales receivables, other government transaction and joint venture related receivables, and cash and equivalents.
Total liabilities at December 31, 2020 were $14.8 billion, slightly higher than total liabilities at December 31, 2019. Our liabilities are primarily comprised of debt, other non-current liabilities such as provisions and deferred income tax liabilities, and accounts payable.

Shareholders’ Equity
February 9, 2021 Number of shares
Common shares 1,778,189,894 
Stock options 50,000 

Financial Position and Liquidity
We believe we have sufficient financial resources to meet our business requirements for the foreseeable future, including capital expenditures, working capital requirements, interest payments and dividends. To date, we have not experienced significant negative impacts to liquidity as a result of the Covid-19 pandemic. During 2020, our cash balance benefited from strong cash flow from operating activities and cash now exceeds debt, such that we are in a net cash positive position as at December 31, 2020.
BARRICK YEAR-END 2020
68
MANAGEMENT’S DISCUSSION AND ANALYSIS


Total cash and cash equivalents as at December 31, 2020 were $5.2 billion. Our capital structure comprises a mix of debt, non-controlling interest (primarily at Nevada Gold Mines) and shareholders’ equity. As at December 31, 2020, our total debt was $5.2 billion (debt net of cash and equivalents was $(33.0) million) and our debt-to-equity ratio was 0.16:1. This compares to debt as at December 31, 2019 of $5.5 billion (debt, net of cash and cash equivalents was $2.2 billion), and a debt-to-equity ratio of 0.19:1.
In 2021, we have capital commitments of $215 million and expect to incur attributable sustaining and project capital expenditures of approximately $1,800 to $2,100 million in 2021 based on our guidance range on page 39. In 2021, we have $308 million in interest payments and other amounts as detailed in the table on page 94. In addition, we have contractual obligations and commitments of $554 million in purchase obligations for supplies and consumables. We expect to fund these commitments through operating cash flow, which is our primary source of liquidity, as well as existing cash balances.
We have announced a proposal for a return of capital distribution for shareholder approval at the Annual and Special Meeting on May 4, 2021. This distribution is derived from a portion of the proceeds from the divestiture of Kalgoorlie Consolidated Gold Mines in November 2019 and from other recent dispositions made by Barrick and its affiliates. It is proposed that the total distribution of approximately $750 million will be effected in three equal tranches to shareholders of record on dates to be determined in May, August and November 2021.
Our operating cash flow is dependent on the ability of our operations to deliver projected future cash flows. The market prices of gold, and to a lesser extent copper, are the primary drivers of our operating cash flow. Other options to enhance liquidity include further portfolio optimization and the creation of new joint ventures and partnerships; issuance of equity securities in the public markets or to private investors, which could be undertaken for liquidity enhancement and/or in connection with establishing a strategic partnership; issuance of long-term debt securities in the public markets or to private investors; and drawing on the $3.0 billion available under our undrawn Credit Facility (subject to compliance with covenants and the making of certain representations and warranties, this facility is available for drawdown as a source of financing). Both Moody’s and S&P rate Barrick’s outstanding long-term debt as investment grade. In October 2020, Moody’s upgraded Barrick’s credit rating from Baa2 to Baa1 and in the second quarter of 2020, S&P confirmed Barrick’s BBB rating and revised their outlook on Barrick’s credit rating to Positive from Stable. The key financial covenant in our undrawn credit facility requires Barrick to maintain a net debt to total capitalization ratio of less than 0.60:1. Barrick’s net debt to total capitalization ratio was 0.00:1 as at December 31, 2020 (0.07:1 as at December 31, 2019).


Summary of Cash Inflow (Outflow)
 
($ millions) For the three months ended For the years ended
  12/31/20 9/30/20 12/31/20 12/31/19 12/31/18
Net cash provided by operating activities 1,638   1,859  5,417  2,833  1,765
Investing activities
Capital expenditures (546) (548) (2,054) (1,701) (1,400)
Investment sales 12  220 
Cash acquired in Merger 0  0  751 
Divestitures 27  283  750 
Dividends received from equity method investments 49  38  141  217 
Other 53  54 124  33 (94)
Total investing inflows (outflows) (405) (454) (1,286) 50 (1,494)
Financing activities
Net change in debta
(8) (8) (379) (309) (687)
Dividendsb
(160) (141) (547) (548) (125)
Net disbursements to non-controlling interests (664) (259) (1,356) (281) (84)
Other 43  28  (1) (29)
Total financing inflows (outflows) (789) (408) (2,254) (1,139) (925)
Effect of exchange rate 0  (3) (1) (9)
Increase (decrease) in cash and equivalents 444   1,001  1,874   1,743  (663)
a.The difference between the net change in debt on a cash basis and the net change on the balance sheet is due to changes in non-cash charges, specifically the unwinding of discounts and amortization of debt issue costs.
b.For the three months and year ended December 31, 2020, we declared and paid dividends per share in US dollars totaling $0.09 and $0.31, respectively (September 30, 2020: declared and paid $0.08; 2019: declared $0.13 and paid $0.20, and also paid $2.69 per share to Randgold shareholders; 2018: declared $0.19 and paid $0.12).

Q4 2020 compared to Q3 2020
In the fourth quarter of 2020, we generated $1,638 million in operating cash flow, compared to $1,859 million in the prior quarter. The decrease of $221 million was primarily due to an increase in interest paid as a result of the timing of payments on our long-term debt (generally paid semi-annually). This was combined with the lower realized gold price4 and a decrease in gold and copper sales volumes.
Cash outflows from investing activities in the fourth quarter of 2020 were $405 million, compared to $454 million in the prior quarter. The decreased outflow was primarily due to the offsetting nature of proceeds from the Morila disposition and an increase in dividends from our equity method investments.
BARRICK YEAR-END 2020
69
MANAGEMENT’S DISCUSSION AND ANALYSIS


Net financing cash outflows for the fourth quarter of 2020 amounted to $789 million, compared to $408 million in the prior quarter. The increase of $381 million is primarily due to an increase in disbursements to non-controlling interests.

2020 compared to 2019
In 2020, we generated $5,417 million in operating cash flow, compared to $2,833 million in the prior year. The increase of $2,584 million was primarily due to a higher realized gold price4, partially offset by higher gold cost of sales per ounce5 and lower gold sales volumes.
Cash outflows from investing activities for 2020 were $1,286 million compared to an inflow of $50 million in
the prior year. The change of $1,336 million was primarily due to the difference in current year cash proceeds of $283 million from the sale of Massawa as well as net investment sales of $220 million mainly from the sale of shares in Shandong Gold, compared to the cash acquired as a result of the Merger of $751 million and total cash consideration received of $750 million relating to the sale of our 50% interest in Kalgoorlie in the prior year. This was further impacted by higher capital expenditures, mainly as a result of the formation of Nevada Gold Mines on July 1, 2019.
Net financing cash outflows for 2020 amounted to $2,254 million, compared to $1,139 million in the prior year. The higher outflows are primarily due to an increase in disbursements to non-controlling interests.


Summary of Financial Instrumentsa
As at December 31, 2020
Financial Instrument Principal/Notional Amount
 Associated  Risks
n  Interest rate
Cash and equivalents $5,188  million
n   Credit
       
n   Credit
Accounts receivable $558  million
n   Market
       
n  Market
Other investments $428  million
n   Liquidity
Accounts payable   $1,458  million
n   Liquidity
Debt   $5,181  million
n  Interest rate
Restricted share units   $39  million
n   Market
Deferred share units   $13  million
n   Market
a.Refer to notes 25, 26 and 28 to the Financial Statements for more information regarding financial instruments, fair value measurements and financial risk management, respectively.

BARRICK YEAR-END 2020
70
MANAGEMENT’S DISCUSSION AND ANALYSIS


Commitments and Contingencies

Litigation and Claims
We are currently subject to various litigation proceedings as disclosed in note 36 to the Financial Statements, and we may be involved in disputes with other parties in the future that may result in litigation. If we are unable to resolve these disputes favorably, it may have a material adverse impact on our financial condition, cash flow and results of operations.
Contractual Obligations and Commitments
In the normal course of business, we enter into contracts that give rise to commitments for future minimum payments. The following table summarizes the remaining contractual maturities of our financial liabilities and operating and capital commitments shown on an undiscounted basis:
 
($ millions) Payments due
as at December 31, 2020
   2021 2022 2023 2024 2025 2026 and thereafter Total
Debta
Repayment of principal 12  5,097  5,116 
Capital leases 13  10  28  65 
Interest 308  307  307  306  306  4,141  5,675 
Provisions for environmental rehabilitationb
236  176  144  160  163  2,030  2,909 
Restricted share units 25  12  39 
Pension benefits and other post-retirement benefits 37  58 
Minimum royalty paymentsc
15  20 
Purchase obligations for supplies and consumablesd
554  223  201  173  147  584  1,882 
Capital commitmentse
215  223 
Social development costsf
13  53  92 
Other Obligationsg
281  295 
Total 1,391  751  674  657  649  12,252  16,374 
a.Debt and Interest - Our debt obligations do not include any subjective acceleration clauses or other clauses that enable the holder of the debt to call for early repayment, except in the event that we breach any of the terms and conditions of the debt or for other customary events of default. We are not required to post any collateral under any debt obligations. Projected interest payments on variable rate debt were based on interest rates in effect at December 31, 2020. Interest is calculated on our long-term debt obligations using both fixed and variable rates.
b.Provisions for environmental rehabilitation - Amounts presented in the table represent the undiscounted uninflated future payments for the expected cost of provisions for environmental rehabilitation.
c.Minimum royalty payments are related to continuing operations and are presented net of recoverable amounts.
d.Purchase obligations for supplies and consumables - Includes commitments related to new purchase obligations to secure a supply of acid, tires and cyanide for our production process.
e.Capital commitments - Purchase obligations for capital expenditures include only those items where binding commitments have been entered into.    
f.Social development costs – Includes a commitment of $14 million in 2026 and thereafter related to the funding of a power transmission line in Argentina.
g.Other Obligations includes the Pueblo Viejo JV partner shareholder loan and the deposit on the Pascua-Lama silver sale agreement with Wheaton.
BARRICK YEAR-END 2020
71
MANAGEMENT’S DISCUSSION AND ANALYSIS


Review of Quarterly Results

Quarterly Informationa
   2020 2019
($ millions, except where indicated) Q4 Q3 Q2 Q1 Q4 Q3 Q2 Q1
Revenues 3,279  3,540  3,055  2,721  2,883  2,678  2,063  2,093 
Realized price per ounce – goldb
1,871  1,926  1,725  1,589  1,483  1,476  1,317  1,307 
Realized price per pound – copperb
3.39  3.28  2.79  2.23  2.76  2.55  2.62  3.07 
Cost of sales 1,814  1,927  1,900  1,776  1,987  1,889  1,545  1,490 
Net earnings (loss) 685  882  357  400  1,387  2,277  194  111 
     Per share (dollars)c
0.39  0.50  0.20  0.22  0.78  1.30  0.11  0.06 
Adjusted net earningsb
616  726  415  285  300  264  154  184 
     Per share (dollars)b,c
0.35  0.41  0.23  0.16  0.17  0.15  0.09  0.11 
Operating cash flow 1,638  1,859  1,031  889  875  1,004  434  520 
Cash consolidated capital expenditures 546  548  509  451  446  502  379  374 
Free cash flowb
1,092  1,311  522  438  429  502  55  146 
a.Sum of all the quarters may not add up to the annual total due to rounding.
b.Realized price, adjusted net earnings, adjusted net earnings per share and free cash flow are non-GAAP financial performance measures with no standardized meaning under IFRS and therefore may not be comparable to similar measures of performance presented by other issuers. For further information and a detailed reconciliation of each non-GAAP measure used in this section of the MD&A to the most directly comparable IFRS measure, please see pages 96 to 122 of this MD&A.
c.Calculated using weighted average number of shares outstanding under the basic method of earnings per share.
 
Our recent financial results reflect our emphasis on cost discipline, an agile management structure that empowers our site based leadership teams, and a portfolio of Tier One1 assets. This combined with rising gold prices has resulted in record operating cash flows in the current year. The strong free cash flow4 generated, together with the proceeds from various divestitures, have allowed us to continue to strengthen our balance sheet over the past two years and to increase returns to shareholders.
These same fundamentals have also driven the higher net earnings in recent quarters. Net earnings has also been impacted by the following items in each quarter which have been excluded from adjusted net earnings4. In the first quarter of 2020, we recorded a net impairment reversal of $115 million (net of tax effects), resulting from the agreement with the GoT being made effective. In the fourth quarter of 2019, we recorded $22 million (net of tax and non-controlling interests) of net impairment charges,
mainly relating to a charge at Pascua-Lama of $296 million (no tax impact), partially offset by a net impairment reversal at Pueblo Viejo of $277 million (net of taxes and non-controlling interest). We also recorded a $628 million (no tax impact) gain on the de-recognition of the deferred revenue liability relating to our silver sale agreement with Wheaton, a gain of $408 million (no tax impact) resulting from the sale of our 50% interest in Kalgoorlie, and a gain of $216 million (no tax impact) on a settlement of customs duty and indirect taxes at Lumwana. In the third quarter of 2019, net earnings and cash flows were impacted by the formation of Nevada Gold Mines and the commencement of the contribution of its operations to Barrick's net earnings and cash flows. Net earnings in the third quarter of 2019 included a $1.5 billion (net of tax effects) gain on the remeasurement of Turquoise Ridge as a result of its contribution to Nevada Gold Mines and a $663 million (net of tax effects) impairment reversal at Lumwana.

Internal Control Over Financial Reporting and Disclosure Controls and Procedures

Management is responsible for establishing and maintaining adequate internal control over financial reporting and disclosure controls and procedures. Internal control over financial reporting is a framework designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with IFRS. The Company’s internal control over financial reporting framework includes those policies and procedures that (i) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of the assets of the Company; (ii) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with IFRS, and that receipts and expenditures of the Company are being made only in accordance with
authorizations of management and directors of the Company; and (iii) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use or disposition of the Company’s assets that could have a material effect on the Company’s consolidated financial statements.
Disclosure controls and procedures form a broader framework designed to provide reasonable assurance that other financial information disclosed publicly fairly presents in all material respects the financial condition, results of operations and cash flows of the Company for the periods presented in this MD&A and Barrick’s Annual Report. The Company’s disclosure controls and procedures framework includes processes designed to ensure that material information relating to the Company, including its consolidated subsidiaries, is made known to management
BARRICK YEAR-END 2020
72
MANAGEMENT’S DISCUSSION AND ANALYSIS


by others within those entities to allow timely decisions regarding required disclosure.
Together, the internal control over financial reporting and disclosure controls and procedures frameworks provide internal control over financial reporting and disclosure. Due to its inherent limitations, internal control over financial reporting and disclosure may not prevent or detect all misstatements. Further, the effectiveness of internal control is subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with policies or procedures may change.
There were no changes in the Company’s internal control over financial reporting during the year ended December 31, 2020 that have materially affected, or are reasonably likely to materially affect, the Company’s internal control over financial reporting.

The management of Barrick, at the direction of our President and Chief Executive Officer and Senior Executive Vice-President, Chief Financial Officer, evaluated the effectiveness of the design and operation of internal control over financial reporting as of the end of the period covered by this report based on the framework and criteria established in Internal Control – Integrated Framework (2013) as issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). Based on that evaluation, management concluded that the Company’s internal control over financial reporting was effective as at December 31, 2020.
Barrick’s annual management report on internal control over financial reporting and the integrated audit report of Barrick’s auditors for the year ended December 31, 2020 will be included in Barrick’s 2020 Annual Report and its 2020 Form 40-F/Annual Information Form on file with the US Securities and Exchange Commission and Canadian provincial securities regulatory authorities.

IFRS Critical Accounting Policies and Accounting Estimates

Management has discussed the development and selection of our critical accounting estimates with the Audit & Risk Committee of the Board of Directors, and the Audit Committee has reviewed the disclosure relating to such estimates in conjunction with its review of this MD&A. The accounting policies and methods we utilize determine how we report our financial condition and results of operations, and they may require Management to make estimates or rely on assumptions about matters that are inherently uncertain. The consolidated financial statements have been prepared in accordance with IFRS as issued by the International Accounting Standards Board (“IASB”) under the historical cost convention, as modified by revaluation of certain financial assets, derivative contracts and post-retirement assets. Our significant accounting policies are disclosed in note 2 to the Financial Statements, including a summary of current and future changes in accounting policies.
Critical Accounting Estimates and Judgments
Certain accounting estimates have been identified as being “critical” to the presentation of our financial condition and results of operations because they require us to make subjective and/or complex judgments about matters that are inherently uncertain; or there is a reasonable likelihood that materially different amounts could be reported under different conditions or using different assumptions and estimates. Our significant accounting judgments, estimates and assumptions are disclosed in note 3 to the accompanying Financial Statements.

Non-GAAP Financial Performance Measures

Adjusted Net Earnings and Adjusted Net Earnings per Share
Adjusted net earnings is a non-GAAP financial measure which excludes the following from net earnings:
Impairment charges (reversals) related to intangibles, goodwill, property, plant and equipment, and investments;
Acquisition/disposition gains/losses;
Foreign currency translation gains/losses;
Significant tax adjustments;
Unrealized gains/losses on non-hedge derivative instruments; and
Tax effect and non-controlling interest of the above items.
Management uses this measure internally to evaluate our underlying operating performance for the reporting periods presented and to assist with the planning and forecasting of future operating results. Management believes that adjusted net earnings is a useful measure of our performance because impairment charges, acquisition/disposition gains/losses and significant tax adjustments do
not reflect the underlying operating performance of our core mining business and are not necessarily indicative of future operating results. Furthermore, foreign currency translation gains/losses and unrealized gains/losses from non-hedge derivatives are not necessarily reflective of the underlying operating results for the reporting periods presented. The tax effect and non-controlling interest of the adjusting items are also excluded to reconcile the amounts to Barrick’s share on a post-tax basis, consistent with net earnings.
As noted, we use this measure for internal purposes. Management’s internal budgets and forecasts and public guidance do not reflect the types of items we adjust for. Consequently, the presentation of adjusted net earnings enables investors and analysts to better understand the underlying operating performance of our core mining business through the eyes of management. Management periodically evaluates the components of adjusted net earnings based on an internal assessment of performance measures that are useful for evaluating the operating performance of our business segments and a
BARRICK YEAR-END 2020
73
MANAGEMENT’S DISCUSSION AND ANALYSIS


review of the non-GAAP measures used by mining industry analysts and other mining companies.
Adjusted net earnings is intended to provide additional information only and does not have any standardized definition under IFRS and should not be considered in isolation or as a substitute for measures of
performance prepared in accordance with IFRS. The measures are not necessarily indicative of operating profit or cash flow from operations as determined under IFRS. Other companies may calculate these measures differently. The following table reconciles these non-GAAP measures to the most directly comparable IFRS measure.

Reconciliation of Net Earnings to Net Earnings per Share, Adjusted Net Earnings and Adjusted Net Earnings per Share
 
For the three months ended For the years ended
($ millions, except per share amounts in dollars) 12/31/20 9/30/20 12/31/20 12/31/19 12/31/18
Net earnings (loss) attributable to equity holders of the Company 685  882  2,324  3,969  (1,545)
Impairment charges (reversals) related to long-lived assetsa
40  (269) (1,423) 900 
Acquisition/disposition (gains) lossesb
(126) (2) (180) (2,327) (68)
(Gain) loss on currency translation 16  16  50  109  136 
Significant tax adjustmentsc
(2) (66) (119) 34  742 
Other (income) expense adjustmentsd
15  (90) 71  (687) 366 
Unrealized gains (losses) on non-hedge derivative instruments 0  0 
Tax effect and non-controlling intereste
(12) (18) 165  1,227  (123)
Adjusted net earnings 616  726  2,042  902  409 
Net earnings (loss) per sharef
0.39  0.50  1.31  2.26  (1.32)
Adjusted net earnings per sharef
0.35  0.41  1.15  0.51  0.35 
a.Net impairment reversals for the current year primarily relate to non-current asset reversals at our Tanzanian assets. Net impairment charges for 2019 primarily relate to non-current asset reversals at Lumwana and Pueblo Viejo, partially offset by impairment charges at Pascua-Lama.
b.Acquisition/disposition gains for the current year primarily relate to the gain on the sale of Eskay Creek, Morila and Bullfrog in the fourth quarter of 2020. This was further impacted by the sale of Massawa in the first quarter of 2020. Acquisition/disposition gains for 2019 primarily relate to the gain on the remeasurement of Turquoise Ridge to fair value as a result of its contribution to Nevada Gold Mines and the gain on sale of our 50% interest in Kalgoorlie.
c.Significant tax adjustments in the current year primarily relate to deferred tax recoveries as a result of tax reform measures in Argentina and adjustments made in recognition of the net settlement of all outstanding disputes with the GoT. Significant tax adjustments for 2018 primarily relate to the de-recognition of our Canadian and Peruvian deferred tax assets.
d.Other expense adjustments for the current year primarily relate to the impact of changes in the discount rate assumptions on our closed mine rehabilitation provision, care and maintenance expenses at Porgera and donations related to Covid-19, partially offset by the gain on the remeasurement of the residual cash liability relating to our silver sale agreement with Wheaton. Other expense adjustments for 2019 primarily relate to the gain on the de-recognition of the deferred revenue liability relating to our silver sale agreement with Wheaton and the gain on a settlement of customs duty and indirect taxes at Lumwana.
e.Tax effect and non-controlling interest for the current year primarily relates to the impairment charges related to long-lived assets.
f.Calculated using weighted average number of shares outstanding under the basic method of earnings per share.


Free Cash Flow
Free cash flow is a measure that deducts capital expenditures from net cash provided by operating activities. Management believes this to be a useful indicator of our ability to operate without reliance on additional borrowing or usage of existing cash.
Free cash flow is intended to provide additional information only and does not have any standardized definition under IFRS, and should not be considered in
isolation or as a substitute for measures of performance prepared in accordance with IFRS. The measure is not necessarily indicative of operating profit or cash flow from operations as determined under IFRS. Other companies may calculate this measure differently. The following table reconciles this non-GAAP measure to the most directly comparable IFRS measure.

Reconciliation of Net Cash Provided by Operating Activities to Free Cash Flow 
For the three months ended For the years ended
  ($ millions) 12/31/20 9/30/20 12/31/20 12/31/19 12/31/18
Net cash provided by operating activities 1,638  1,859  5,417  2,833  1,765 
Capital expenditures (546) (548) (2,054) (1,701) (1,400)
Free cash flow 1,092   1,311  3,363   1,132  365 
 

BARRICK YEAR-END 2020
74
MANAGEMENT’S DISCUSSION AND ANALYSIS


Total cash costs per ounce, All-in sustaining costs per ounce, All-in costs per ounce, C1 cash costs per pound and All-in sustaining costs per pound

Total cash costs per ounce, all-in sustaining costs per ounce and all-in costs per ounce are non-GAAP financial measures which are calculated based on the definition published by the World Gold Council (a market development organization for the gold industry comprised of and funded by gold mining companies from around the world, including Barrick, the “WGC”). The WGC is not a regulatory organization. Management uses these measures to monitor the performance of our gold mining operations and its ability to generate positive cash flow, both on an individual site basis and an overall company basis.
Total cash costs start with our cost of sales related to gold production and removes depreciation, the non-controlling interest of cost of sales and includes by-product credits. All-in sustaining costs start with total cash costs and include sustaining capital expenditures, sustaining leases, general and administrative costs, minesite exploration and evaluation costs and reclamation cost accretion and amortization. These additional costs reflect the expenditures made to maintain current production levels.
All-in costs starts with all-in sustaining costs and adds additional costs that reflect the varying costs of producing gold over the life-cycle of a mine, including: project capital expenditures (capital expenditures at new projects and discrete projects at existing operations intended to increase production capacity and will not benefit production for at least 12 months) and other non-sustaining costs (primarily non-sustaining leases, exploration and evaluation costs, community relations costs and general and administrative costs that are not associated with current operations). These definitions recognize that there are different costs associated with the life-cycle of a mine, and that it is therefore appropriate to distinguish between sustaining and non-sustaining costs.
We believe that our use of total cash costs, all-in sustaining costs and all-in costs will assist analysts, investors and other stakeholders of Barrick in understanding the costs associated with producing gold, understanding the economics of gold mining, assessing our operating performance and also our ability to generate free cash flow from current operations and to generate free cash flow on an overall company basis. Due to the capital-intensive nature of the industry and the long useful lives over which these items are depreciated, there can be a significant timing difference between net earnings calculated in accordance with IFRS and the amount of free
cash flow that is being generated by a mine and therefore we believe these measures are useful non-GAAP operating metrics and supplement our IFRS disclosures. These measures are not representative of all of our cash expenditures as they do not include income tax payments, interest costs or dividend payments. These measures do not include depreciation or amortization.
Total cash costs per ounce, all-in sustaining costs and all-in costs are intended to provide additional information only and do not have standardized definitions under IFRS and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. These measures are not equivalent to net income or cash flow from operations as determined under IFRS. Although the WGC has published a standardized definition, other companies may calculate these measures differently.
In addition to presenting these metrics on a by-product basis, we have calculated these metrics on a co-product basis. Our co-product metrics remove the impact of other metal sales that are produced as a by-product of our gold production from cost per ounce calculations but does not reflect a reduction in costs for costs associated with other metal sales.
C1 cash costs per pound and all-in sustaining costs per pound are non-GAAP financial measures related to our copper mine operations. We believe that C1 cash costs per pound enables investors to better understand the performance of our copper operations in comparison to other copper producers who present results on a similar basis. C1 cash costs per pound excludes royalties and production taxes and non-routine charges as they are not direct production costs. All-in sustaining costs per pound is similar to the gold all-in sustaining costs metric and management uses this to better evaluate the costs of copper production. We believe this measure enables investors to better understand the operating performance of our copper mines as this measure reflects all of the sustaining expenditures incurred in order to produce copper. All-in sustaining costs per pound includes C1 cash costs, sustaining capital expenditures, sustaining leases, general and administrative costs, minesite exploration and evaluation costs, royalties and production taxes, reclamation cost accretion and amortization and write-downs taken on inventory to net realizable value.


BARRICK YEAR-END 2020
75
MANAGEMENT’S DISCUSSION AND ANALYSIS


Reconciliation of Gold Cost of Sales to Total cash costs, All-in sustaining costs and All-in costs, including on a per ounce basis
  For the three months ended For the years ended
  ($ millions, except per ounce information in dollars)  Footnote 12/31/20 9/30/20 12/31/20 12/31/19 12/31/18
Cost of sales applicable to gold production 1,681  1,768  6,832  6,514  4,621 
 Depreciation (495) (508) (1,975) (1,902) (1,253)
Cash cost of sales applicable to equity method investments
69  53  222  226 
By-product credits
(56) (84) (228) (138) (131)
Realized (gains) losses on hedge and non-hedge derivatives
a (1) 0 
Non-recurring items
b 1  1  (55) (172)
Other
c (55) (24) (129) (102) (87)
Non-controlling interests
d (323) (337) (1,312) (878) (313)
Total cash costs
  821  868  3,411  3,666  2,668 
  General  & administrative costs 24  50  185  212  265 
Minesite exploration and evaluation costs
e 22  19  79  69  45 
Minesite sustaining capital expenditures
f 354  415  1,559  1,320  975 
Sustaining leases
12  31  27 
Rehabilitation - accretion and amortization (operating sites)
g 11  13  46  65  81 
Non-controlling interest, copper operations and other
h (142) (166) (594) (470) (374)
  All-in sustaining costs
  1,102  1,208  4,717  4,889  3,660 
Project exploration and evaluation and project costs
e 52  53  216  273  338 
Community relations costs not related to current operations
0  1 
Project capital expenditures
f 184  126  471  370  459 
Non-sustaining leases 4  4 
Rehabilitation - accretion and amortization (non-operating sites)
g 4  10  22  33 
Non-controlling interest and copper operations and other
h (61) (47) (157) (105) (21)
All-in costs   1,285  1,343  5,262  5,451  4,473 
Ounces sold - equity basis (000s ounces) i 1,186  1,249  4,879  5,467  4,544 
Cost of sales per ounce j,k 1,065  1,065  1,056  1,005  892 
Total cash costs per ounce k 692  696  699  671  588 
Total cash costs per ounce (on a co-product basis) k,l 718  742  727  689  607 
All-in sustaining costs per ounce k 929  966  967  894  806 
All-in sustaining costs per ounce (on a co-product basis) k,l 955  1,012  995  912  825 
All-in costs per ounce k 1,083  1,076  1,079  996  985 
All-in costs per ounce (on a co-product basis) k,l 1,109  1,122  1,107  1,014  1,004 

a.Realized (gains) losses on hedge and non-hedge derivatives
Includes realized hedge losses of $nil and $nil for the three months and year ended December 31, 2020, respectively (September 30, 2020: $nil; 2019: $nil; 2018: $4 million), and realized non-hedge gains of $1 million and $nil for the three months and year ended December 31, 2020, respectively (September 30, 2020: $nil; 2019: losses of $1 million; 2018: gains of $1 million). Refer to note 5 to the Financial Statements for further information.

b.Non-recurring items
These costs are not indicative of our cost of production and have been excluded from the calculation of total cash costs. Non-recurring items in 2019 relate to organizational restructuring. In 2018, non-recurring items mainly relate to inventory impairment of $166 million at Lagunas Norte.

c.Other
Other adjustments for the three months and year ended December 31, 2020 include the removal of total cash costs and by-product credits associated with Pierina, Golden Sunlight starting in the third quarter of 2019, Morila starting in the third quarter of 2019 up until its divestiture in November 2020, and Lagunas Norte starting in the fourth quarter of 2019 of $26 million and $104 million, respectively (September 30, 2020: $27 million; 2019: $92 million; 2018: $87 million). These assets are producing incidental ounces as they reach the end of their mine lives.

BARRICK YEAR-END 2020
76
MANAGEMENT’S DISCUSSION AND ANALYSIS


d.Non-controlling interests
Non-controlling interests include non-controlling interests related to gold production of $490 million and $1,959 million, respectively, for the three months and year ended December 31, 2020 (September 30, 2020: $508 million; 2019: $1,306 million; 2018: $453 million). Non-controlling interests include Pueblo Viejo; North Mara, Bulyanhulu and Buzwagi (until September 30, 2019, notwithstanding the completion of the Acacia transaction on September 17, 2019, we consolidated our interest in Acacia and recorded a non-controlling interest of 36.1% in the income statement for the entirety of the third quarter of 2019 as a matter of convenience; and from January 1, 2020 onwards, the date the GoT’s 16% free carried interest was made effective). Commencing January 1, 2019, the effective date of the Merger, the non-controlling interests also include Loulo-Gounkoto and Tongon and starting July 1, 2019, it also includes Nevada Gold Mines. Refer to note 5 to the Financial Statements for further information.

e.Exploration and evaluation costs
Exploration, evaluation and project expenses are presented as minesite if it supports current mine operations and project if it relates to future projects. Refer to page 88 of this MD&A.

f.Capital expenditures
Capital expenditures are related to our gold sites only and are presented on a 100% cash basis starting from January 1, 2019 and on a 100% accrued basis for 2018. They are split between minesite sustaining and project capital expenditures. Project capital expenditures are distinct projects designed to increase the net present value of the mine and are not related to current
production. Significant projects in the current year are the expansion project at Pueblo Viejo, the Goldrush exploration declines, the restart of mining activities at Bulyanhulu, and construction of the third shaft at Turquoise Ridge. Refer to page 87 of this MD&A.

g.Rehabilitation - accretion and amortization
Includes depreciation on the assets related to rehabilitation provisions of our gold operations and accretion on the rehabilitation provisions of our gold operations, split between operating and non-operating sites.

h.Non-controlling interest and copper operations
Removes general & administrative costs related to non-controlling interests and copper based on a percentage allocation of revenue. Also removes exploration, evaluation and project expenses, rehabilitation costs and capital expenditures incurred by our copper sites and the non-controlling interest of North Mara, Bulyanhulu and Buzwagi (until September 30, 2019 notwithstanding the completion of the Acacia transaction on September 17, 2019, we consolidated our interest in Acacia and recorded a non-controlling interest of 36.1% in the income statement for the entirety of the third quarter of 2019 as a matter of convenience; and from January 1, 2020 onwards, the date the GoT’s 16% free carried interest was made effective), Pueblo Viejo and South Arturo (63.1% of South Arturo from July 1, 2019 onwards as a result of its contribution to Nevada Gold Mines). Commencing January 1, 2019, the effective date of the Merger, also removes the non-controlling interest of our Loulo-Gounkoto and Tongon. Also removes Nevada Gold Mines starting July 1, 2019. It also includes capital expenditures applicable to equity method investments. Figures remove the impact of Pierina, Golden Sunlight starting the third quarter of 2019, Morila starting in the third quarter of 2019 up until its divestiture in November 2020, and Lagunas Norte starting in the fourth quarter of 2019. The impact is summarized as the following:
($ millions)
For the three months ended For the years ended
   Non-controlling interest, copper operations and other 12/31/20 9/30/20 12/31/20 12/31/19 12/31/18
   General  & administrative costs
(5) (6) (25) (58) (104)
Minesite exploration and evaluation costs
(9) (5) (25) (16) (3)
Rehabilitation - accretion and amortization (operating sites)
(3) (3) (14) (13) (6)
   Minesite sustaining capital expenditures (125) (152) (530) (383) (261)
   All-in sustaining costs total
(142) (166) (594) (470) (374)
   Project exploration and evaluation and project costs
(6) (9) (25) (54) (16)
Project capital expenditures
(55) (38) (132) (51) (5)
   All-in costs total
(61) (47) (157) (105) (21)

i.Ounces sold - equity basis
Figures remove the impact of Pierina, Golden Sunlight starting in the third quarter of 2019, Morila starting in the third quarter of 2019 up until its divestiture in November 2020, and Lagunas Norte starting in the fourth quarter of 2019. These assets are producing incidental ounces as they reach the end of their mine lives.

j.Cost of sales per ounce
Figures remove the cost of sales impact of Pierina of $4 million and $18 million, respectively, for the three months and year ended December 31, 2020 (September 30, 2020: $4 million; 2019: $113 million; 2018: $116 million); starting in the third quarter of 2019, Golden Sunlight of $nil and $nil, respectively, for the three months and year ended December 31, 2020 (September 30, 2020: $nil; 2019: $1 million; 2018: $nil); starting in the third quarter of 2019 up until its divestiture in November 2020, Morila of $2 million and $22 million, respectively, for the three months and year ended December 31, 2020 (September 30, 2020: $7 million; 2019: $23 million; 2018: $nil); and starting in the fourth quarter of 2019, Lagunas Norte of $26 million and $92 million, respectively, for the three months and year ended December 31, 2020 (September 30, 2020: $22 million; 2019: $26 million; 2018: $nil). These assets are producing incidental ounces as they reach the end of their mine lives. Cost of sales per ounce excludes non-controlling interest related to gold production. Cost of sales applicable to gold per ounce is calculated using cost of sales applicable to gold on an attributable basis (removing the non-controlling interest of 40% Pueblo Viejo, 16% North Mara, Bulyanhulu and Buzwagi starting January 1, 2020, the date the GoT’s 16% free carried interest was made effective (36.1% from January 1, 2018 to September 30, 2019; notwithstanding the completion of the Acacia transaction on September 17, 2019, we consolidated our interest in Acacia and recorded a non-controlling interest of 36.1% in the income statement for the entirety of the third quarter of 2019 as a matter of convenience); and 63.1% South Arturo from cost of sales from July 1, 2019 onwards as a result of its contribution to Nevada Gold Mines (and on a 40% basis from January 1, 2018 to June 30, 2019), divided by attributable gold ounces. Commencing January 1, 2019, the effective date of the Merger, the non-controlling interest of 20% Loulo-Gounkoto and 10.3% Tongon is also removed from cost of sales and our proportionate share of cost of sales attributable to equity method investments (Kibali, and Morila until the second quarter of 2019) is included. Cost of sales applicable to gold per ounce also removes the non-controlling interest of 38.5% Nevada Gold Mines from July 1, 2019 onwards.

k.Per ounce figures
Cost of sales per ounce, cash costs per ounce, all-in sustaining costs per ounce and all-in costs per ounce may not calculate based on amounts presented in this table due to rounding.


BARRICK YEAR-END 2020
77
MANAGEMENT’S DISCUSSION AND ANALYSIS


l.Co-product costs per ounce
Cash costs per ounce, all-in sustaining costs per ounce and all-in costs per ounce presented on a co-product basis remove the impact of by-product credits of our gold production (net of non-controlling interest) calculated as:
($ millions)
For the three months ended For the years ended
  
12/31/20 9/30/20 12/31/20 12/31/19 12/31/18
   By-product credits
56  84  228  138  131 
   Non-controlling interest
(27) (29) (92) (48) (45)
   By-product credits (net of non-controlling interest)
29   55  136   90  86 



Reconciliation of Gold Cost of Sales to Total cash costs, All-in sustaining costs and All-in costs, including on a per ounce basis, by operating segment
($ millions, except per ounce information in dollars) For the three months ended 12/31/20
   Footnote
Carlin a
Cortez b
Turquoise Ridgec
Long Canyond
Phoenix d
Nevada Gold Minese
Hemlo North America
Cost of sales applicable to gold production 385  197  156  56  89  883  79  962 
Depreciation (74) (57) (52) (44) (21) (248) (16) (264)
   By-product credits (1) (1) (3) 0  (42) (47) 0  (47)
   Non-recurring items f 0  0  0  0  0  0  0  0 
Other 0  0  0  0  0  0  0  0 
Non-controlling interests (120) (54) (38) (5) (10) (227) 0  (227)
Total cash costs 190  85  63  7  16  361  63  424 
General & administrative costs 0  0  0  0  0  0  0  0 
Minesite exploration and evaluation costs g 13  0  0  3  0  16  1  17 
Minesite sustaining capital expenditures h 97  28  10  12  3  160  20  180 
Sustaining capital leases 0  0  0  0  0  1  0  1 
Rehabilitation - accretion and amortization (operating sites) i 2  3  0  0  1  6  0  6 
Non-controlling interests (43) (12) (4) (6) (1) (70) 0  (70)
All-in sustaining costs 259  104  69  16  19  474  84  558 
Project exploration and evaluation and project costs g 0  0  0  0  0  0  0  0 
Project capital expenditures h 0  8  6  0  0  48  0  48 
Non-controlling interests 0  (3) (2) 0  0  (17) 0  (17)
All-in costs 259  109  73  16  19  505  84  589 
Ounces sold - equity basis (000s ounces) 259  116  90  51  26  542  57  599 
Cost of sales per ounce j,k 917  1,043  1,064  674  2,054  1,007  1,379  1,043 
Total cash costs per ounce k 740  738  687  145  590  667  1,104  709 
Total cash costs per ounce (on a co-product basis) k,l 742  741  710  146  1,557  720  1,109  757 
All-in sustaining costs per ounce k 1,005  906  757  324  670  873  1,464  930 
All-in sustaining costs per ounce (on a co-product basis) k,l 1,007  909  780  325  1,637  926  1,469  978 
All-in costs per ounce k 1,005  948  799  324  670  925  1,464  977 
All-in costs per ounce (on a co-product basis) k,l 1,007  951  822  325  1,637  978  1,469  1,025 







BARRICK YEAR-END 2020
78
MANAGEMENT’S DISCUSSION AND ANALYSIS


($ millions, except per ounce information in dollars) For the three months ended 12/31/20
   Footnote Pueblo Viejo Veladero Latin America & Asia Pacific
Cost of sales applicable to gold production 203  54  257 
Depreciation (61) (17) (78)
   By-product credits (16) (2) (18)
   Non-recurring items f 0  0  0 
Other 0  0  0 
   Non-controlling interests (52) 0  (52)
Total cash costs 74  35  109 
General & administrative costs 0  0  0 
Minesite exploration and evaluation costs g 3  0  3 
Minesite sustaining capital expenditures h 45  35  80 
Sustaining capital leases 0  1  1 
Rehabilitation - accretion and amortization (operating sites) i 2  1  3 
Non-controlling interests (20) 0  (20)
All-in sustaining costs 104  72  176 
Project exploration and evaluation and project costs g 0  0  0 
Project capital expenditures h 64  0  64 
Non-controlling interests (25) 0  (25)
All-in costs 143  72  215 
Ounces sold - equity basis (000s ounces) 153  51  204 
Cost of sales per ounce j,k 803  1,074  894 
Total cash costs per ounce k 493  698  545 
Total cash costs per ounce (on a co-product basis) k,l 560  734  604 
All-in sustaining costs per ounce k 689  1,428  878 
All-in sustaining costs per ounce (on a co-product basis) k,l 756  1,464  937 
All-in costs per ounce k 941  1,428  1,066 
All-in costs per ounce (on a co-product basis) k,l 1,008  1,464  1,125 

























BARRICK YEAR-END 2020
79
MANAGEMENT’S DISCUSSION AND ANALYSIS


($ millions, except per ounce information in dollars) For the three months ended 12/31/20
   Footnote Loulo-Gounkoto Kibali
North Maram
Tongon
Bulyanhulu m
Buzwagi m
Africa & Middle East
Cost of sales applicable to gold production 181  104  82  99  28  33  527 
Depreciation (65) (48) (21) (41) (13) (2) (190)
By-product credits 0  0  (1) 0  0  0  (1)
Non-recurring items f 0  0  0  0  0  0  0 
Other 0  0  0  0  0  0  0 
Non-controlling interests (23) 0  (10) (6) (2) (5) (46)
Total cash costs 93  56  50  52  13  26  290 
General & administrative costs 0  0  0  0  0  0  0 
Minesite exploration and evaluation costs g 2  0  0  1  0  0  3 
Minesite sustaining capital expenditures h 27  11  13  2  1  0  54 
Sustaining capital leases 1  2  0  0  0  0  3 
Rehabilitation - accretion and amortization (operating sites) i 0  0  1  0  0  0  1 
Non-controlling interests (6) 0  (2) 0  0  0  (8)
All-in sustaining costs 117  69  62  55  14  26  343 
Project exploration and evaluation and project costs g 0  0  0  0  0  0  0 
Project capital expenditures h 7  1  18  0  43  0  69 
Non-controlling interests (1) 0  (3) 0  (7) 0  (11)
All-in costs 123  70  77  55  50  26  401 
Ounces sold - equity basis (000s ounces) 126  89  63  64  20  21  383 
Cost of sales per ounce j,k 1,149  1,163  1,073  1,371  1,181  1,314  1,188 
Total cash costs per ounce k 734  616  799  810  610  1,267  753 
Total cash costs per ounce (on a co-product basis) k,l 734  621  806  811  621  1,242  753 
All-in sustaining costs per ounce k 923  783  989  853  664  1,283  896 
All-in sustaining costs per ounce (on a co-product basis) k,l 923  788  996  854  675  1,258  898 
All-in costs per ounce k 970  787  1,232  853  2,493  1,283  1,046 
All-in costs per ounce (on a co-product basis) k,l 970  792  1,239  854  2,504  1,258  1,048 













BARRICK YEAR-END 2020
80
MANAGEMENT’S DISCUSSION AND ANALYSIS


($ millions, except per ounce information in dollars) For the three months ended 9/30/20
   Footnote
Carlin a
Cortez b
Turquoise Ridgec
Long Canyond
Phoenix d
Nevada Gold Minese
Hemlo North America
Cost of sales applicable to gold production 440  198  136  64  90  928  69  997 
Depreciation (82) (54) (41) (48) (23) (248) (8) (256)
By-product credits (1) (1) (2) (39) (43) (1) (44)
Non-recurring items f
Other
Non-controlling interests (137) (55) (36) (6) (10) (244) (244)
Total cash costs 220  88  57  10  18  393  60  453 
General & administrative costs
Minesite exploration and evaluation costs g 11  11 
Minesite sustaining capital expenditures h 97  64  10  189  21  210 
Sustaining capital leases
Rehabilitation - accretion and amortization (operating sites) i
Non-controlling interests (41) (26) (3) (4) (2) (78) (78)
All-in sustaining costs 285  130  62  17  23  521  81  602 
Project exploration and evaluation and project costs g
Project capital expenditures h 20  15  59  59 
Non-controlling interests (7) (6) (24) (24)
All-in costs 285  143  71  17  23  556  81  637 
Ounces sold - equity basis (000s ounces) 275  115  76  45  31  542  55  597 
Cost of sales per ounce j,k 985  1,060  1,097  877  1,773  1,060  1,257  1,078 
Total cash costs per ounce k 800  763  745  212  520  723  1,099  758 
Total cash costs per ounce (on a co-product basis) k,l 802  768  766  216  1,308  774  1,104  805 
All-in sustaining costs per ounce k 1,036  1,133  805  384  659  956  1,497  1,006 
All-in sustaining costs per ounce (on a co-product basis) k,l 1,038  1,138  826  388  1,447  1,007  1,502  1,053 
All-in costs per ounce k 1,036  1,236  929  384  659  1,025  1,502  1,069 
All-in costs per ounce (on a co-product basis) k,l 1,038  1,241  950  388  1,447  1,076  1,507  1,116 







BARRICK YEAR-END 2020
81
MANAGEMENT’S DISCUSSION AND ANALYSIS


($ millions, except per ounce information in dollars) For the three months ended 9/30/20
   Footnote Pueblo Viejo Veladero Latin America & Asia Pacific
Cost of sales applicable to gold production 169  49  218 
Depreciation (56) (17) (73)
By-product credits (17) (1) (18)
Non-recurring items f
Other
Non-controlling interests (38) (38)
Total cash costs 58  31  89 
General & administrative costs
Minesite exploration and evaluation costs g
Minesite sustaining capital expenditures h 32  18  50 
Sustaining capital leases
Rehabilitation - accretion and amortization (operating sites) i
Non-controlling interests (13) (13)
All-in sustaining costs 78  51  129 
Project exploration and evaluation and project costs g
Project capital expenditures h 18  18 
Non-controlling interests (7) (7)
All-in costs 90  51  141 
Ounces sold - equity basis (000s ounces) 129  43  172 
Cost of sales per ounce j,k 791  1,136  877 
Total cash costs per ounce k 450  708  515 
Total cash costs per ounce (on a co-product basis) k,l 527  743  581 
All-in sustaining costs per ounce k 609  1,159  746 
All-in sustaining costs per ounce (on a co-product basis) k,l 686  1,194  812 
All-in costs per ounce k 697  1,159  813 
All-in costs per ounce (on a co-product basis) k,l 774  1,194  879 













BARRICK YEAR-END 2020
82
MANAGEMENT’S DISCUSSION AND ANALYSIS


($ millions, except per ounce information in dollars) For the three months ended 9/30/20
   Footnote Loulo-Gounkoto Kibali
North Maram
Tongon
Bulyanhulu m
Buzwagi m
Africa & Middle East
Cost of sales applicable to gold production 185  99  73  96  82  79  614 
Depreciation (69) (43) (20) (43) (28) (4) (207)
By-product credits (1) (6) (14) (21)
Non-recurring items f
Other
Non-controlling interests (23) (8) (6) (8) (9) (54)
Total cash costs 93  56  44  47  40  52  332 
General & administrative costs
Minesite exploration and evaluation costs g
Minesite sustaining capital expenditures h 77  14  102 
Sustaining capital leases
Rehabilitation - accretion and amortization (operating sites) i
Non-controlling interests (16) (1) (17)
All-in sustaining costs 159  75  51  49  43  52  429 
Project exploration and evaluation and project costs g
Project capital expenditures h 11  13  18  42 
Non-controlling interests (2) (2) (3) (7)
All-in costs 168  75  62  49  58  52  464 
Ounces sold - equity basis (000s ounces) 136  91  69  65  46  73  480 
Cost of sales per ounce j,k 1,088  1,088  903  1,329  1,502  907  1,106 
Total cash costs per ounce k 682  617  649  731  874  687  691 
Total cash costs per ounce (on a co-product basis) k,l 682  622  656  732  996  863  732 
All-in sustaining costs per ounce k 1,161  817  758  777  913  693  891 
All-in sustaining costs per ounce (on a co-product basis) k,l 1,161  822  765  778  1,035  869  932 
All-in costs per ounce k 1,229  823  912  778  1,243  693  965 
All-in costs per ounce (on a co-product basis) k,l 1,229  828  919  779  1,365  869  1,006 













BARRICK YEAR-END 2020
83
MANAGEMENT’S DISCUSSION AND ANALYSIS


($ millions, except per ounce information in dollars) For the year ended 12/31/2020
   Footnote
Carlin a
Cortez b
Turquoise Ridgec
Long Canyond
Phoenix d
Nevada Gold Minese
Hemlo North America
Cost of sales applicable to gold production 1,624  764  575  227  365  3,555  281  3,836 
Depreciation (306) (221) (184) (165) (94) (970) (44) (1,014)
By-product credits (2) (2) (7) 0  (137) (148) (1) (149)
Non-recurring items f 0  0  0  0  0  0  0  0 
Other 0  0  0  0  0  0  0  0 
Non-controlling interests (507) (208) (148) (24) (51) (938) 0  (938)
Total cash costs 809  333  236  38  83  1,499  236  1,735 
General & administrative costs 0  0  0  0  0  0  0  0 
Minesite exploration and evaluation costs g 30  7  7  8  0  52  1  53 
Minesite sustaining capital expenditures h 381  235  39  35  29  748  79  827 
Sustaining capital leases 1  0  0  0  1  4  0  4 
Rehabilitation - accretion and amortization (operating sites) i 8  13  0  2  3  26  1  27 
Non-controlling interests (163) (98) (18) (17) (13) (321) 0  (321)
All-in sustaining costs 1,066  490  264  66  103  2,008  317  2,325 
Project exploration and evaluation and project costs g 0  0  0  0  0  0  0  0 
Project capital expenditures h 0  51  44  0  0  200  0  200 
Non-controlling interests 0  (19) (17) 0  0  (76) 0  (76)
All-in costs 1,066  522  291  66  103  2,132  317  2,449 
Ounces sold - equity basis (000s ounces) 1,024  491  332  161  126  2,134  224  2,358 
Cost of sales per ounce j,k 976  957  1,064  869  1,772  1,029  1,256  1,050 
Total cash costs per ounce k 790  678  711  236  649  702  1,056  735 
Total cash costs per ounce (on a co-product basis) k,l 791  680  723  238  1,315  745  1,060  774 
All-in sustaining costs per ounce k 1,041  998  798  405  814  941  1,423  987 
All-in sustaining costs per ounce (on a co-product basis) k,l 1,042  1,000  810  407  1,480  984  1,427  1,026 
All-in costs per ounce k 1,041  1,062  879  405  814  998  1,424  1,039 
All-in costs per ounce (on a co-product basis) k,l 1,042  1,064  891  407  1,480  1,041  1,428  1,078 
















BARRICK YEAR-END 2020
84
MANAGEMENT’S DISCUSSION AND ANALYSIS


($ millions, except per ounce information in dollars) For the year ended 12/31/2020
   Footnote Pueblo Viejo Veladero
Porgera n
Latin America & Asia Pacific
Cost of sales applicable to gold production 735  213  106  1,054 
Depreciation (224) (69) (25) (318)
By-product credits (57) (5) (1) (63)
Non-recurring items 0  0  0  0 
Other f 0  0  0  0 
Non-controlling interests (182) 0  0  (182)
Total cash costs 272  139  80  491 
General & administrative costs 0  0  0  0 
Minesite exploration and evaluation costs g 3  0  2  5 
Minesite sustaining capital expenditures h 132  98  11  241 
Sustaining capital leases 0  2  3  5 
Rehabilitation - accretion and amortization (operating sites) i 6  4  0  10 
Non-controlling interests (56) 0  0  (56)
All-in sustaining costs 357  243  96  696 
Project exploration and evaluation and project costs g 1  0  0  1 
Project capital expenditures h 91  15  0  106 
Non-controlling interests (37) 0 0 (37)
All-in costs 412  258  96  766 
Ounces sold - equity basis (000s ounces) 541  186  87  814 
Cost of sales per ounce j,k 819  1,151  1,225  938 
Total cash costs per ounce k 504  748  928  604 
Total cash costs per ounce (on a co-product basis) k,l 568  777  934  654 
All-in sustaining costs per ounce k 660  1,308  1,115  856 
All-in sustaining costs per ounce (on a co-product basis) k,l 724  1,337  1,121  906 
All-in costs per ounce k 761  1,390  1,116  942 
All-in costs per ounce (on a co-product basis) k,l 825  1,419  1,122  992 














BARRICK YEAR-END 2020
85
MANAGEMENT’S DISCUSSION AND ANALYSIS


($ millions, except per ounce information in dollars) For the year ended 12/31/2020
   Footnote Loulo-Gounkoto Kibali
North Maram
Tongon
Bulyanhulu m
Buzwagi m
Africa & Middle East
Cost of sales applicable to gold production 719  397  318  380  184  211  2,209 
Depreciation (267) (174) (91) (167) (72) (11) (782)
By-product credits 0  (1) (2) 0  (10) (22) (35)
Non-recurring items f 0  0  0  0  0  0  0 
Other 0  0  0  0  0  0  0 
Non-controlling interests (90) 0  (36) (22) (16) (28) (192)
Total cash costs 362  222  189  191  86  150  1,200 
General & administrative costs 0  0  0  0  0  0  0 
Minesite exploration and evaluation costs g 11  2  0  3  0  0  16 
Minesite sustaining capital expenditures h 213  49  68  8  7  1  346 
Sustaining capital leases 3  9  0  2  0  1  15 
Rehabilitation - accretion and amortization (operating sites) i 3  1  4  0  1  0  9 
Non-controlling interests (46) 0  (12) (1) (1) 0  (60)
All-in sustaining costs 546  283  249  203  93  152  1,526 
Project exploration and evaluation and project costs g 0  0  0  0  0  0  0 
Project capital expenditures h 19  2  35  0  69  0  125 
Non-controlling interests (4) 0  (5) 0  (11) 0  (20)
All-in costs 561  285  279  203  151  152  1,631 
Ounces sold - equity basis (000s ounces) 542  364  269  255  103  174  1,707 
Cost of sales per ounce j,k 1,060  1,091  992  1,334  1,499  1,021  1,119 
Total cash costs per ounce k 666  608  702  747  832  859  701 
Total cash costs per ounce (on a co-product basis) k,l 666  612  709  748  913  968  719 
All-in sustaining costs per ounce k 1,006  778  929  791  895  871  893 
All-in sustaining costs per ounce (on a co-product basis) k,l 1,006  782  936  792  976  980  911 
All-in costs per ounce k 1,034  782  1,039  791  1,459  871  954 
All-in costs per ounce (on a co-product basis) k,l 1,034  786  1,046  792  1,540  980  972 
















BARRICK YEAR-END 2020
86
MANAGEMENT’S DISCUSSION AND ANALYSIS


($ millions, except per ounce information in dollars) For the year ended 12/31/2019
   Footnote
Carlin a
Cortez b
Turquoise Ridgec
Long Canyond
Phoenix d
Nevada Gold Minese
Hemlo North America
Cost of sales applicable to gold production 1,310  751  425  101  154  2,741  247  2,988 
Depreciation (312) (240) (140) (70) (36) (798) (27) (825)
By-product credits (1) (1) (2) (48) (52) (1) (53)
Non-recurring items f (10) (10) (23) (33)
Other
Non-controlling interests (266) (99) (75) (12) (27) (479) (479)
Total cash costs 721  411  208  19  43  1,402  196  1,598 
General & administrative costs
Minesite exploration and evaluation costs g 17  36  37 
Minesite sustaining capital expenditures h 307  129  70  26  22  554  47  601 
Sustaining capital leases
Rehabilitation - accretion and amortization (operating sites) i 10  16  30  32 
Non-controlling interests (102) (44) (21) (12) (10) (189) (189)
All-in sustaining costs 953  520  264  39  58  1,834  247  2,081 
Project exploration and evaluation and project costs g
Project capital expenditures h 186  45  295  295 
Non-controlling interests (21) (10) (48) (48)
All-in costs 953  685  299  39  58  2,081  247  2,328 
Ounces sold - equity basis (000s ounces) 967  798  356  57  45  2,223  217  2,440 
Cost of sales per ounce j,k 1,004  762  846  1,088  2,093  924  1,137  943 
Total cash costs per ounce k 746  515  585  333  947  634  904  655 
Total cash costs per ounce (on a co-product basis) k,l 747  516  588  335  1,600  657  907  677 
All-in sustaining costs per ounce k 984  651  732  681  1,282  828  1,140  851 
All-in sustaining costs per ounce (on a co-product basis) k,l 985  652  735  683  1,935  851  1,143  873 
All-in costs per ounce k 984  854  834  681  1,282  938  1,141  953 
All-in costs per ounce (on a co-product basis) k,l 985  855  837  683  1,935  961  1,144  975 


















BARRICK YEAR-END 2020
87
MANAGEMENT’S DISCUSSION AND ANALYSIS


($ millions, except per ounce information in dollars) For the year ended 12/31/2019
   Footnote Pueblo Viejo Veladero
Porgera n
Kalgoorlie o
Latin America & Asia Pacific
Cost of sales applicable to gold production 721  323  284  223  1,551 
Depreciation (196) (115) (42) (38) (391)
By-product credits (61) (8) (3) (1) (73)
Non-recurring items f (2) (1) (3)
Other
Non-controlling interests (187) (187)
Total cash costs 275  199  239  184  897 
General & administrative costs
Minesite exploration and evaluation costs g 11 
Minesite sustaining capital expenditures h 107  91  45  52  295 
Sustaining capital leases
Rehabilitation - accretion and amortization (operating sites) i 10  (2) 16 
Non-controlling interests (47) (47)
All-in sustaining costs 345  300  287  249  1,181 
Project exploration and evaluation and project costs g
Project capital expenditures h 15  15 
Non-controlling interests (3) (3)
All-in costs 350  315  287  249  1,201 
Ounces sold - equity basis (000s ounces) 584  271  285  210  1,350 
Cost of sales per ounce j,k 747  1,188  994  1,062  937 
Total cash costs per ounce k 471  734  838  873  664 
Total cash costs per ounce (on a co-product basis) k,l 536  759  848  876  716 
All-in sustaining costs per ounce k 592  1,105  1,003  1,183  874 
All-in sustaining costs per ounce (on a co-product basis) k,l 657  1,130  1,013  1,186  926 
All-in costs per ounce k 600  1,162  1,003  1,183  885 
All-in costs per ounce (on a co-product basis) k,l 665  1,187  1,013  1,186  937 











BARRICK YEAR-END 2020
88
MANAGEMENT’S DISCUSSION AND ANALYSIS


($ millions, except per ounce information in dollars) For the year ended 12/31/2019
   Footnote Loulo-Gounkoto Kibali
North Maram
Tongon
Bulyanhulu m
Buzwagi m
Africa & Middle East
Cost of sales applicable to gold production 751  403  310  402  45  138  2,049 
Depreciation (295) (196) (97) (186) (19) (8) (801)
By-product credits (1) (2) (1) (1) (1) (6)
Non-recurring items f
Other
Non-controlling interests (91) (51) (23) (7) (36) (208)
Total cash costs 365  206  160  192  18  93  1,034 
General & administrative costs
Minesite exploration and evaluation costs g 12  18 
Minesite sustaining capital expenditures h 165  41  48  11  267 
Sustaining capital leases
Rehabilitation - accretion and amortization (operating sites) i
Non-controlling interests (37) (13) (2) (1) (53)
All-in sustaining costs 509  251  198  206  20  95  1,279 
Project exploration and evaluation and project costs g
Project capital expenditures h 18 
Non-controlling interests (1) (3) (1) (5)
All-in costs 512  253  204  206  22  95  1,292 
Ounces sold - equity basis (000s ounces) 575  363  248  245  27  81  1,539 
Cost of sales per ounce j,k 1,044  1,111  953  1,469  1,207  1,240  1,126 
Total cash costs per ounce k 634  568  646  787  676  1,156  673 
Total cash costs per ounce (on a co-product basis) k,l 634  571  654  789  709  1,166  677 
All-in sustaining costs per ounce k 886  693  802  844  773  1,178  834 
All-in sustaining costs per ounce (on a co-product basis) k,l 886  696  810  846  806  1,188  838 
All-in costs per ounce k 891  701  824  846  840  1,178  842 
All-in costs per ounce (on a co-product basis) k,l 891  704  832  848  873  1,188  846 













BARRICK YEAR-END 2020
89
MANAGEMENT’S DISCUSSION AND ANALYSIS


($ millions, except per ounce information in dollars) For the year ended 12/31/2018
   Footnote
Carlin a
Cortez b
Turquoise Ridgec
Long Canyond
Phoenix d
Nevada Gold Minese
Hemlo
Golden Sunlightp
Cost of sales applicable to gold production 886  828  206  1,921  195  53 
Depreciation (262) (386) (28) (677) (18)
By-product credits (1) (1) (2) (1)
Non-recurring items f
Other
Non-controlling interests
Total cash costs 623  441  178  1,242  176  53 
General & administrative costs
Minesite exploration and evaluation costs g 13  19 
Minesite sustaining capital expenditures h 195  65  20  280  42 
Sustaining capital leases
Rehabilitation - accretion and amortization (operating sites) i 25  31 
Non-controlling interests (10) (10)
All-in sustaining costs 826  537  199  1,562  222  59 
Project exploration and evaluation and project costs g
Project capital expenditures h 276  42  354 
Non-controlling interests
All-in costs 826  813  241  1,922  222  59 
Ounces sold - equity basis (000s ounces) 842  1,255  262  2,359  168  30 
Cost of sales per ounce j,k 1,054  659  783  814  1,157  1,755 
Total cash costs per ounce k 740  351  678  526  1,046  1,762 
Total cash costs per ounce (on a co-product basis) k,l 742  352  678  527  1,050  1,772 
All-in sustaining costs per ounce k 983  430  756  664  1,318  1,954 
All-in sustaining costs per ounce (on a co-product basis) k,l 985  431  756  665  1,322  1,964 
All-in costs per ounce k 983  649  916  814  1,320  1,954 
All-in costs per ounce (on a co-product basis) k,l 985  650  916  815  1,324  1,964 

















BARRICK YEAR-END 2020
90
MANAGEMENT’S DISCUSSION AND ANALYSIS


($ millions, except per ounce information in dollars) For the year ended 12/31/2018
   Footnote Pueblo Viejo
Lagunas Norte p
Veladero
Porgera n
Kalgoorlie o
Cost of sales applicable to gold production 732  337  310  213  288 
Depreciation (185) (46) (121) (42) (52)
By-product credits (90) (13) (8) (2) (2)
Non-recurring items f (2) (166) (4)
Other
Non-controlling interests (183)
Total cash costs 274  112  177  169  234 
General & administrative costs
Minesite exploration and evaluation costs g 10 
Minesite sustaining capital expenditures h 145  20  143  62  26 
Sustaining capital leases
Rehabilitation - accretion and amortization (operating sites) i 10  25  (1)
Non-controlling interests (62)
All-in sustaining costs 367  159  323  230  274 
Project exploration and evaluation and project costs g
Project capital expenditures h
Non-controlling interests
All-in costs 367  161  323  230  274 
Ounces sold - equity basis (000s ounces) 590  251  280  213  320 
Cost of sales per ounce j,k 750  1,342  1,112  996  899 
Total cash costs per ounce k 465  448  629  796  732 
Total cash costs per ounce (on a co-product basis) k,l 553  499  654  810  737 
All-in sustaining costs per ounce k 623  636  1,154  1,083  857 
All-in sustaining costs per ounce (on a co-product basis) k,l 711  687  1,179  1,097  862 
All-in costs per ounce k 623  644  1,154  1,083  857 
All-in costs per ounce (on a co-product basis) k,l 711  695  1,179  1,097  862 














BARRICK YEAR-END 2020
91
MANAGEMENT’S DISCUSSION AND ANALYSIS


($ millions, except per ounce information in dollars) For the year ended 12/31/2018
   Footnote
Loulo-Gounkoto q
Kibali q
North Maram
Tongon q
Bulyanhulu m
Buzwagi m
Morila p,q
Cost of sales applicable to gold production 264  53  139 
Depreciation (62) (24) (3)
By-product credits (2) (1) (1)
Non-recurring items f
Other
Non-controlling interests (72) (10) (49)
Total cash costs 128  18  86 
General & administrative costs
Minesite exploration and evaluation costs g
Minesite sustaining capital expenditures h 74 
Sustaining capital leases
Rehabilitation - accretion and amortization (operating sites) i
Non-controlling interests (27) (1) (2)
All-in sustaining costs 177  21  89 
Project exploration and evaluation and project costs g
Project capital expenditures h
Non-controlling interests (3) (1)
All-in costs 182  24  89 
Ounces sold - equity basis (000s ounces) 212  27  94 
Cost of sales per ounce j,k 795  1,231  939 
Total cash costs per ounce k 603  650  916 
Total cash costs per ounce (on a co-product basis) k,l 609  674  922 
All-in sustaining costs per ounce k 830  754  947 
All-in sustaining costs per ounce (on a co-product basis) k,l 836  778  953 
All-in costs per ounce k 855  848  947 
All-in costs per ounce (on a co-product basis) k,l 861  872  953 
a.On July 1, 2019, Barrick's Goldstrike and Newmont's Carlin were contributed to Nevada Gold Mines and are now referred to as Carlin. As a result, the amounts presented represent Goldstrike on a 100% basis (including our 60% share of South Arturo) up until June 30, 2019, and the combined results of Carlin and Goldstrike (including our 60% share of South Arturo) on a 61.5% basis thereafter.

b. On July 1, 2019, Cortez was contributed to Nevada Gold Mines, a joint venture with Newmont. As a result, the amounts presented are on a 100% basis up until June 30, 2019, and on a 61.5% basis thereafter.

c.Barrick owned 75% of Turquoise Ridge through to the end of the second quarter of 2019, with our joint venture partner, Newmont, owning the remaining 25%. Turquoise Ridge was proportionately consolidated on the basis that the joint venture partners that have joint control have rights to the assets and obligations for the liabilities relating to the arrangement. The figures presented in this table are based on our 75% interest in Turquoise Ridge until June 30, 2019. On July 1, 2019, Barrick's 75% interest in Turquoise Ridge and Newmont's Twin Creeks and 25% interest in Turquoise Ridge were contributed to Nevada Gold Mines. Starting July 1, 2019, the results represent our 61.5% share of Turquoise Ridge and Twin Creeks, now referred to as Turquoise Ridge.

d.A 61.5% interest in these sites was acquired as a result of the formation of Nevada Gold Mines on July 1, 2019. The results for 2018 did not form a part of the Barrick consolidated results as these sites were acquired as a result of the formation of Nevada Gold Mines. Therefore, no comparative figures are provided.

e.Represents the combined results of Cortez, Goldstrike (including our 60% share of South Arturo) and our 75% interest in Turquoise Ridge until June 30, 2019. Commencing July 1, 2019, the date Nevada Gold Mines was established, the results represent our 61.5% interest in Cortez, Carlin (including Goldstrike and 60% of South Arturo), Turquoise Ridge (including Twin Creeks), Phoenix and Long Canyon.

f. Non-recurring items 
Non-recurring items in 2019 relate to organizational restructuring. These costs are not indicative of our cost of production and have been excluded from the calculation of total cash costs.

g.Exploration and evaluation costs
Exploration, evaluation and project expenses are presented as minesite sustaining if it supports current mine operations and project if it relates to future projects. Refer to page 88 of this MD&A.

BARRICK YEAR-END 2020
92
MANAGEMENT’S DISCUSSION AND ANALYSIS



h.Capital expenditures  
Capital expenditures are related to our gold sites only and are presented on a 100% cash basis starting from January 1, 2019 and on a 100% accrued basis for 2018. They are split between minesite sustaining and project capital expenditures. Project capital expenditures are distinct projects designed to increase the net present value of the mine and are not related to current production. Significant projects in the current year are the expansion project at Pueblo Viejo, the Goldrush exploration declines, the restart of mining activities at Bulyanhulu, and construction of the third shaft at Turquoise Ridge. Refer to page 87 of this MD&A.

i.Rehabilitation - accretion and amortization  
Includes depreciation on the assets related to rehabilitation provisions of our gold operations and accretion on the rehabilitation provision of our gold operations, split between operating and non-operating sites.

j.Cost of sales per ounce
Cost of sales applicable to gold per ounce is calculated using cost of sales applicable to gold on an attributable basis (removing the non-controlling interest of 40% Pueblo Viejo, 16% North Mara, Bulyanhulu and Buzwagi starting January 1, 2020, the date the GoT’s 16% free carried interest was made effective (36.1% from January 1, 2018 to September 30, 2019; notwithstanding the completion of the Acacia transaction on September 17, 2019, we consolidated our interest in Acacia and recorded a non-controlling interest of 36.1% in the income statement for the entirety of the third quarter of 2019 as a matter of convenience); and 63.1% South Arturo from cost of sales from July 1, 2019 onwards as a result of its contribution to Nevada Gold Mines (and on a 40% basis from January 1, 2018 to June 30, 2019), divided by attributable gold ounces. Commencing January 1, 2019, the effective date of the Merger, the non-controlling interest of 20% Loulo-Gounkoto and 10.3% Tongon is also removed from cost of sales and our proportionate share of cost of sales attributable to equity method investments (Kibali, and Morila until the second quarter of 2019) is included. Cost of sales applicable to gold per ounce also removes the non-controlling interest of 38.5% Nevada Gold Mines from July 1, 2019 onwards.

k.Per ounce figures    
Cost of sales per ounce, total cash costs per ounce, all-in sustaining costs per ounce and all-in costs per ounce may not calculate based on amounts presented in this table due to rounding.

l.Co-product costs per ounce   
Total cash costs per ounce, all-in sustaining costs per ounce and all-in costs per ounce presented on a co-product basis removes the impact of by-product credits of our gold production (net of non-controlling interest) calculated as:
($ millions) For the three months ended 12/31/20
  
Carlin a
Cortez b
Turquoise Ridgec
Long Canyond
Phoenix d
Nevada Gold Minese
Hemlo Pueblo Viejo Veladero
By-product credits 1  1  3  0  42  47  0  16  2 
Non-controlling interest 0  0  (1) 0  (16) (18) 0  (6) 0 
By-product credits (net of non-controlling interest) 1  1  2  0  26  29  0  10  2 
($ millions) For the three months ended 12/31/20
   Loulo-Gounkoto Kibali
North Maram
Tongon
Bulyanhulu m
Buzwagi m
By-product credits 0 0  1  0  0  0 
Non-controlling interest 0 0  0  0  0  0 
By-product credits (net of non-controlling interest) 0 0  1  0  0  0 
($ millions) For the three months ended 9/30/20
  
Carlin a
Cortez b
Turquoise Ridgec
Long Canyond
Phoenix d
Nevada Gold Minese
Hemlo Pueblo Viejo Veladero
By-product credits 39  43  17 
Non-controlling interest  (1) (1) (14) (16) (8)
By-product credits (net of non-controlling interest) 25  27 
($ millions) For the three months ended 9/30/20
   Loulo-Gounkoto Kibali
North Maram
Tongon
Bulyanhulu m
Buzwagi m
By-product credits 14 
Non-controlling interest  (1) (3)
By-product credits (net of non-controlling interest) 11 
 
BARRICK YEAR-END 2020
93
MANAGEMENT’S DISCUSSION AND ANALYSIS


   For the year ended 12/31/20
  
Carlin a
Cortez b
Turquoise Ridgec
Long Canyond
Phoenix d
Nevada Gold Minese
Hemlo
Pueblo Viejo
Veladero
By-product credits
2  2  7  0  137  148  1  57  5 
Non-controlling interest 
(1) (1) (3) 0  (53) (57) 0  (23) 0 
By-product credits (net of non-controlling interest)
1  1  4  0  84  91  1  34  5 
   For the year ended 12/31/20
  
Porgera n
Kibali
Loulo-Gounkoto
North Maram
Tongon
Bulyanhulu m
Buzwagi m
By-product credits 1  1  0  2  0  10  22 
Non-controlling interest  0  0  0  0  0  (2) (4)
By-product credits (net of non-controlling interest) 1  1  0  2  0  8  18 
   For the year ended 12/31/19
  
Carlin a
Cortez b
Turquoise Ridgec
Long Canyond
Phoenix d
Nevada Gold Minese
Hemlo Pueblo Viejo Veladero
By-product credits 48  52  61 
Non-controlling interest  (1) (18) (19) (24)
By-product credits (net of non-controlling interest) 30  33  37 
   For the year ended 12/31/19
  
Porgera n
Kalgoorlie o
Loulo-Gounkoto Kibali
North Maram
Tongon
Bulyanhulu m
Buzwagi m
By-product credits
Non-controlling interest 
By-product credits (net of non-controlling interest)

   For the year ended 12/31/18
  
Carlin a
Cortez b
Turquoise Ridgec
Long Canyond
Phoenix d
Nevada Gold Minese
Hemlo
Golden Sunlightp
Pueblo Viejo Veladero
By-product credits 90 
Non-controlling interest  (37)
By-product credits (net of non-controlling interest) 53 
   For the year ended 12/31/18
  
Porgera n
Kalgoorlie o
Lagunas Norte p
Loulo-Gounkoto q
Kibali q
North Maram
Tongon q
Bulyanhulu m
Buzwagi m
Morila p,q
By-product credits 13 
Non-controlling interest  (1)
By-product credits (net of non-controlling interest) 13 

m.Formerly part of Acacia Mining plc. On September 17, 2019, Barrick acquired all of the shares of Acacia it did not already own. The results presented are on a 63.9% basis until September 30, 2019 (notwithstanding the completion of the Acacia transaction on September 17, 2019, we consolidated our interest in Acacia and recorded a non-controlling interest of 36.1% in the income statement for the entirety of the third quarter of 2019 as a matter of convenience); on a 100% basis from October 1, 2019 to December 31, 2019; and on a 84% basis starting January 1, 2020, the date the GoT’s 16% free carried interest was made effective.

n. As Porgera was placed on care and maintenance on April 25, 2020, no operating data or per ounce data was provided for the three month periods ended December 31, 2020 and September 30, 2020.

o.On November 28, 2019, we completed the sale of our 50% interest in Kalgoorlie in Western Australia to Saracen Mineral Holdings Limited for total cash consideration of $750 million. The transaction resulted in a gain of $408 million for the year ended December 31, 2019. The operating results reported for Kalgoorlie reflect the Company’s attributable share of Kalgoorlie’s results until the date of divestiture.

p.With the end of mining at Lagunas Norte in the third quarter of 2019 and at Golden Sunlight and Morila in the second quarter of 2019 as previously reported, we have ceased to include production or non-GAAP cost metrics for these sites from October 1, 2019 and July 1, 2019, respectively, onwards.
BARRICK YEAR-END 2020
94
MANAGEMENT’S DISCUSSION AND ANALYSIS



q.The results for 2018 did not form a part of the Barrick consolidated results as these sites were acquired as a result of the Merger. Therefore, no comparative figures are provided.



Reconciliation of Copper Cost of Sales to C1 cash costs and All-in sustaining costs, including on a per pound basis
 
For the three months ended For the years ended
($ millions, except per pound information in dollars) 12/31/20 9/30/20 12/31/20 12/31/19 12/31/18
 Cost of sales 125  154  556  361  558 
         Depreciation/amortization (41) (61) (208) (100) (170)
  Treatment and refinement charges 39  39  157  99  144 
Cash cost of sales applicable to equity method investments 72  57  267  288  281 
  Less: royalties and production taxesa
(16) (16) (54) (35) (44)
        By-product credits (5) (4) (15) (9) (6)
  Other 0  0  (5) (11)
 C1 cash cost of sales
174  169  703  599  752 
  General & administrative costs 5  18  19  28 
  Rehabilitation - accretion and amortization 1  8  15  16 
        Royalties and production taxes 16  16  54  35  44 
        Minesite exploration and evaluation costs 1  5 
        Minesite sustaining capital expenditures 65  74  223  215  220 
Sustaining leases 2  9 
  Inventory write-downs 0  0  11 
 All-in sustaining costs
264  269  1,020  894  1,075 
 Pounds sold - consolidated basis (millions pounds) 108  116  457  355  382 
 Cost of sales per poundb,c
2.06  1.97  2.02  2.14  2.40 
 C1 cash costs per poundb
1.61  1.45  1.54  1.69  1.97 
 All-in sustaining costs per poundb
2.42   2.31  2.23   2.52  2.82 
a.For the three months and year ended December 31, 2020, royalties and production taxes include royalties of $16 million and $54 million, respectively (September 30, 2020: $16 million, 2019: $34 million and 2018: $39 million).
b.Cost of sales per pound, C1 cash costs per pound and all-in sustaining costs per pound may not calculate based on amounts presented in this table due to rounding.
c.Cost of sales per pound related to copper is calculated using cost of sales including our proportionate share of cost of sales attributable to equity method investments (Zaldívar and Jabal Sayid), divided by consolidated copper pounds sold (including our proportionate share of copper pounds sold from our equity method investments).


BARRICK YEAR-END 2020
95
MANAGEMENT’S DISCUSSION AND ANALYSIS


Reconciliation of Copper Cost of Sales to C1 cash costs and All-in sustaining costs, including on a per pound basis, by operating site
For the three months ended
($ millions, except per pound information in dollars) 12/31/20 9/30/20
   Zaldívar Lumwana Jabal Sayid Zaldívar Lumwana Jabal Sayid
Cost of sales 68  125  28  46  154  30 
Depreciation/amortization (17) (41) (7) (12) (61) (7)
Treatment and refinement charges 1  33  5  34 
Less: royalties and production taxesa
0  (16) 0  (16)
By-product credits 0  0  (5) (4)
Other 0  0  0 
C1 cash cost of sales
52  101  21  34  111  24 
Rehabilitation - accretion and amortization 0  1  0 
Royalties and production taxes 0  16  0  16 
Minesite exploration and evaluation costs 1  0  0 
Minesite sustaining capital expenditures 15  48  2  11  63 
Capital lease payments 1  1  0 
Inventory write-downs 0  0  0 
All-in sustaining costs
69  167  23  47  193  25 
Pounds sold - consolidated basis (millions pounds) 25  65  18  21  74  21 
Cost of sales per poundb,c
2.68  1.96  1.53  2.20  2.06  1.43 
C1 cash costs per poundb
2.01  1.58  1.15  1.64  1.49  1.14 
All-in sustaining costs per poundb
2.70   2.60   1.27   2.27  2.58  1.17 
($ millions, except per pound information in dollars) For the years ended December 31
12/31/20 12/31/19 12/31/18
   Zaldívar Lumwana Jabal Sayid Zaldívar Lumwana Jabal Sayid Zaldívar Lumwana Jabal Sayid
Cost of sales 262  556  104  307  361  93  261  558  98 
Depreciation/amortization (72) (208) (27) (86) (100) (27) (59) (170) (19)
Treatment and refinement charges 1  137  19  80  19  125  19 
Less: royalties and production taxesa
0  (54) 0  (35) (39) (5)
By-product credits 0  0  (15) (9) (6)
Other 0  0  0  (5) (11)
C1 cash cost of sales 191  431  81  221  301  76  202  463  87 
Rehabilitation - accretion and amortization 0  8  0  10  16 
Royalties and production taxesa
0  54  0  35  39 
Minesite exploration and evaluation costs 4  0  1 
Minesite sustaining capital expenditures 39  175  9  34  166  15  49  154  17 
Sustaining leases 5  4  0 
Inventory write-downs 0  0  0  11 
All-in sustaining costs 239  672  91  269  514  91  253  685  109 
Pounds sold - consolidated basis (millions pounds) 106  277  74  125  169  61  103  222  57 
Cost of sales per poundb,c
2.46  2.01  1.42  2.46  2.13  1.53  2.55  2.51  1.73 
C1 cash costs per poundb
1.79  1.56  1.11  1.77  1.79  1.26  1.97  2.08  1.53 
All-in sustaining costs per poundb
2.25   2.43   1.24   2.15  3.04  1.51  2.47  3.08  1.92 
a.For the three months and year ended December 31, 2020, royalties and production taxes include royalties of $16 million and $54 million, respectively (September 30, 2020: $16 million, 2019: $34 million and 2018: $39 million).
b.Cost of sales per pound, C1 cash costs per pound and all-in sustaining costs per pound may not calculate based on amounts presented in this table due to rounding.
c.Cost of sales per pound applicable to copper is calculated using cost of sales including our proportionate share of cost of sales attributable to equity method investments (Zaldívar and Jabal Sayid), divided by consolidated copper pounds sold (including our proportionate share of copper pounds sold from our equity method investments).
BARRICK YEAR-END 2020
96
MANAGEMENT’S DISCUSSION AND ANALYSIS


EBITDA and Adjusted EBITDA
EBITDA is a non-GAAP financial measure, which excludes the following from net earnings:
Income tax expense;
Finance costs;
Finance income; and
Depreciation.

Management believes that EBITDA is a valuable indicator of our ability to generate liquidity by producing operating cash flow to fund working capital needs, service debt obligations, and fund capital expenditures. Management uses EBITDA for this purpose. EBITDA is also frequently used by investors and analysts for valuation purposes whereby EBITDA is multiplied by a factor or “EBITDA multiple” that is based on an observed or inferred relationship between EBITDA and market values to determine the approximate total enterprise value of a company.
Adjusted EBITDA removes the effect of impairment charges; acquisition/disposition gains/losses; foreign currency translation gains/losses; other expense adjustments; and unrealized gains on non-hedge derivative instruments. We also remove the impact of the income tax expense, finance costs, finance income and depreciation incurred in our equity method accounted investments. We believe these items provide a greater level of consistency
with the adjusting items included in our adjusted net earnings reconciliation, with the exception that these amounts are adjusted to remove any impact on finance costs/income, income tax expense and/or depreciation as they do not affect EBITDA. We believe this additional information will assist analysts, investors and other stakeholders of Barrick in better understanding our ability to generate liquidity from our full business, including equity method investments, by excluding these amounts from the calculation as they are not indicative of the performance of our core mining business and not necessarily reflective of the underlying operating results for the periods presented.
EBITDA and adjusted EBITDA are intended to provide additional information to investors and analysts and do not have any standardized definition under IFRS, and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. EBITDA and adjusted EBITDA exclude the impact of cash costs of financing activities and taxes, and the effects of changes in operating working capital balances, and therefore are not necessarily indicative of operating profit or cash flow from operations as determined under IFRS. Other companies may calculate EBITDA and adjusted EBITDA differently.


Reconciliation of Net Earnings to EBITDA and Adjusted EBITDA
For the three months ended For the years ended
  ($ millions) 12/31/20 9/30/20 12/31/20 12/31/19 12/31/18
Net earnings (loss) 1,058  1,271  3,614  4,574  (1,435)
   Income tax expense 404  284  1,332  1,783  1,198 
   Finance costs, neta
72  72  306  394  458 
   Depreciation 544  574  2,208  2,032  1,457 
EBITDA 2,078  2,201  7,460  8,783  1,678 
Impairment charges (reversals) of long-lived assetsb
40  (269) (1,423) 900 
Acquisition/disposition (gains)/lossesc
(126) (2) (180) (2,327) (68)
Foreign currency translation (gains)/losses 16  16  50  109  136 
Other (income) expense adjustmentsd
15  (90) 71  (687) 336 
Unrealized gains on non-hedge derivative instruments 0  0 
Income tax expense, net finance costsa, and depreciation from equity investees
83  94  360  378  97 
Adjusted EBITDA 2,106   2,223  7,492   4,833  3,080 
a.Finance costs exclude accretion.
b.Net impairment reversals for the current year primarily relate to non-current asset reversals at our Tanzanian assets. Net impairment charges for 2019 primarily relate to non-current asset reversals at Lumwana and Pueblo Viejo, partially offset by impairment charges at Pascua-Lama.
c.Acquisition/disposition gains for the current year primarily relate to the gain on the sale of Eskay Creek, Morila and Bullfrog in the fourth quarter of 2020. This was further impacted by the sale of Massawa in the first quarter of 2020. Acquisition/disposition gains for 2019 primarily relate to the gain on the remeasurement of Turquoise Ridge to fair value as a result of its contribution to Nevada Gold Mines and the gain on sale of our 50% interest in Kalgoorlie.
d.Other expense adjustments for the current year primarily relate to the impact of changes in the discount rate assumptions on our closed mine rehabilitation provision, care and maintenance expenses at Porgera and donations related to Covid-19, partially offset by the gain on the remeasurement of the residual cash liability relating to our silver sale agreement with Wheaton. Other expense adjustments for 2019 primarily relate to the gain on the de-recognition of the deferred revenue liability relating to our silver sale agreement with Wheaton and the gain on a settlement of customs duty and indirect taxes at Lumwana.

BARRICK YEAR-END 2020
97
MANAGEMENT’S DISCUSSION AND ANALYSIS


Reconciliation of Segment Income to Segment EBITDA
($ millions) For the three months ended 12/31/20
  
Carlin a (61.5%)
Cortez b (61.5%)
Turquoise Ridgec (61.5%)
Nevada Gold Minesd (61.5%)
Pueblo Viejo (60%) Loulo-Gounkoto (80%) Kibali (45%) Veladero (50%) Porgera (47.5%)
North Marae (84%)
Bulyanhulu e (84%)
Income 244  92  72  482  167  91  58  44  (17) 49  13 
Depreciation 45  35  32  152  37  52  48  17  5  17  10 
EBITDA 289  127  104  634  204  143  106  61  (12) 66  23 
For the three months ended 9/30/20
  
Carlin a (61.5%)
Cortez b (61.5%)
Turquoise Ridgec (61.5%)
Nevada Gold Minesd (61.5%)
Pueblo Viejo (60%) Loulo-Gounkoto (80%) Kibali (45%) Veladero (50%) Porgera (47.5%)
North Marae (84%)
Bulyanhulu e (84%)
Income 247  96  62  481  147  92  74  30  (17) 72  25 
Depreciation 50  33  25  152  34  55  43  17  17  23 
EBITDA 297  129  87  633  181  147  117  47  (13) 89  48 
For the year ended 12/31/20
  
Carlin a (61.5%)
Cortez b (61.5%)
Turquoise Ridgec (61.5%)
Nevada Gold Minesd (61.5%)
Pueblo Viejo (60%) Loulo-Gounkoto (80%) Kibali (45%) Veladero (50%) Porgera (47.5%)
North Marae (84%)
Bulyanhulu e (84%)
Income 795  386  229  1,636  508  358  244  114  (18) 214  27 
Depreciation 188  136  113  596  136  214  174  69  25  76  60 
EBITDA 983  522  342  2,232  644  572  418  183  7  290 87
   For the year ended 12/31/19
  
Carlin a (61.5%)
Cortez b (61.5%)
Turquoise Ridgec (61.5%)
Nevada Gold Minesd (61.5%)
Pueblo Viejo (60%) Loulo-Gounkoto (80%) Kibali (45%) Veladero (50%) Porgera (47.5%)
North Marae (84%)
Bulyanhulu e (84%)
Income 370  459  201  1,050  402  190  108 57  113  112  (14)
Depreciation 239  197  92  592  120  236  196 115  42  75  14 
EBITDA 609  656  293  1,642  522  426  304 172  155  187 
For the year ended 12/31/18
  
Carlin a (61.5%)
Cortez b (61.5%)
Turquoise Ridgec (61.5%)
Nevada Gold Minesd (61.5%)
Pueblo Viejo (60%)
Loulo-Gounkoto f (80%)
Kibali f (45%)
Veladero (50%) Porgera (47.5%)
North Marae (84%)
Bulyanhulu e (84%)
Income 166  726  126  1,011  342  53  56  94  (18)
Depreciation 262  386  28  677  115  121  42  40  33 
EBITDA 428  1,112  154  1,688  457  174  98  134  15 
a.On July 1, 2019, Barrick's Goldstrike and Newmont's Carlin were contributed to Nevada Gold Mines and are now referred to as Carlin. As a result, the amounts presented represent Goldstrike on a 100% basis (including our 60% share of South Arturo) up until June 30, 2019, and the combined results of Carlin and Goldstrike (including our 60% share of South Arturo) on a 61.5% basis thereafter.
b.On July 1, 2019, Cortez was contributed to Nevada Gold Mines, a joint venture with Newmont. As a result, the amounts presented are on a 100% basis up until June 30, 2019, and on a 61.5% basis thereafter.
c.Barrick owned 75% of Turquoise Ridge through to the end of the second quarter of 2019, with our joint venture partner, Newmont, owning the remaining 25%. Turquoise Ridge was proportionately consolidated on the basis that the joint venture partners that have joint control have rights to the assets and obligations for the liabilities relating to the arrangement. The figures presented in this table are based on our 75% interest in Turquoise Ridge until June 30, 2019. On July 1, 2019, Barrick's 75% interest in Turquoise Ridge and Newmont's Twin Creeks and 25% interest in Turquoise Ridge were contributed to Nevada Gold Mines. Starting July 1, 2019, the results represent our 61.5% share of Turquoise Ridge and Twin Creeks, now referred to as Turquoise Ridge.
d.Represents the combined results of Cortez, Goldstrike (including our 60% share of South Arturo) and our 75% interest in Turquoise Ridge until June 30, 2019. Commencing July 1, 2019, the date Nevada Gold Mines was established, the results represent our 61.5% interest in Cortez, Carlin (including Goldstrike and 60% of South Arturo), Turquoise Ridge (including Twin Creeks), Phoenix and Long Canyon.
e.Formerly part of Acacia Mining plc. On September 17, 2019, Barrick acquired all of the shares of Acacia it did not own. Operating results are included at 63.9% until September 30, 2019 (notwithstanding the completion of the Acacia transaction on September 17, 2019, we consolidated our interest in Acacia and recorded a non-controlling interest of 36.1% in the income statement for the entirety of the third quarter of 2019 as a matter of convenience), on a 100% basis from October 1, 2019, to December 31, 2019, and on an 84% basis thereafter as the GoT’s 16% free-carried interest was made effective from January 1, 2020.
f.The results for 2018 did not form a part of the Barrick consolidated results as these sites were acquired as a result of the Merger. Therefore, no comparative figures are provided.


BARRICK YEAR-END 2020
98
MANAGEMENT’S DISCUSSION AND ANALYSIS


Realized Price
Realized price is a non-GAAP financial measure which excludes from sales:
Unrealized gains and losses on non-hedge derivative contracts;
Unrealized mark-to-market gains and losses on provisional pricing from copper and gold sales contracts;
Sales attributable to ore purchase arrangements;
Treatment and refining charges; and
Cumulative catch-up adjustment to revenue relating to our streaming arrangements.

This measure is intended to enable Management to better understand the price realized in each reporting period for gold and copper sales because unrealized mark-to-market values of non-hedge gold and copper derivatives are subject to change each period due to changes in market factors such as market and forward gold and copper prices, so that prices ultimately realized may differ from those recorded. The exclusion of such unrealized mark-to-market gains and losses from the presentation of this performance measure enables investors to understand performance based on the realized proceeds of selling gold and copper production.
The gains and losses on non-hedge derivatives and receivable balances relate to instruments/balances that mature in future periods, at which time the gains and losses will become realized. The amounts of these gains and losses reflect fair values based on market valuation assumptions at the end of each period and do not necessarily represent the amounts that will become realized on maturity. We believe this provides investors and analysts with a more accurate measure with which to compare to market gold prices and to assess our gold sales performance. For those reasons, management believes that this measure provides a more accurate reflection of our Company’s past performance and is a better indicator of its expected performance in future periods.
The realized price measure is intended to provide additional information, and does not have any standardized definition under IFRS and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. The measure is not necessarily indicative of sales as determined under IFRS. Other companies may calculate this measure differently. The following table reconciles realized prices to the most directly comparable IFRS measure.
 
Reconciliation of Sales to Realized Price per ounce/pound
For the three  months ended For the years ended
($ millions, except per ounce/pound information in dollars) Gold Copper Gold Copper
   12/31/20 9/30/20 12/31/20 9/30/20 12/31/20 12/31/19 12/31/18 12/31/20 12/31/19 12/31/18
Sales 3,028  3,237  195  219  11,670  9,186  6,600  697   393  512 
Sales applicable to non-controlling interests (934) (967) 0  (3,494) (1,981) (734) 0 
Sales applicable to equity method investmentsa,b
168  183  135  121  648  543  483  492  442 
Realized non-hedge gold/copper derivative (losses) gains 0  0  0  0 
Sales applicable to sites in care and maintenancec
(41) (53) 0  (170) (140) (111) 0 
Treatment and refinement charges 1  39  39  7  157  99  144 
Export duties 0  0  0  (1) 0 
Otherd
(1) 0  13  22  12  0 
Revenues – as adjusted 2,221  2,404  369  379  8,674  7,631  5,769  1,337   984  1,098 
Ounces/pounds sold (000s ounces/millions pounds)c
1,186  1,249  108  116  4,879  5,467  4,544  457   355  382 
Realized gold/copper price per ounce/pounde
1,871   1,926  3.39   3.28  1,778   1.396  1,270  2.92  2.77  2.88 
a.Represents sales of $168 million and $648 million, respectively, for the three months and year ended December 31, 2020 (September 30, 2020: $176 million; 2019: $505 million; 2018: $nil) applicable to our 45% equity method investment in Kibali and $nil and $nil, respectively (September 30, 2020: $nil; 2019: $39 million; 2018: $nil) applicable to our 40% equity method investment in Morila for gold. Represents sales of $82 million and $298 million, respectively, for the three months and year ended December 31, 2020 (September 30, 2020: $66 million; 2019: $343 million; 2018: $300 million) applicable to our 50% equity method investment in Zaldívar and $59 million and $204 million, respectively (September 30, 2020: $59 million; 2019: $168 million; 2018: $161 million) applicable to our 50% equity method investment in Jabal Sayid.
b.Sales applicable to equity method investments are net of treatment and refinement charges.
c. Figures exclude Pierina, Golden Sunlight starting in the third quarter of 2019, Morila starting in the third quarter of 2019 up until its divestiture in November 2020, and Lagunas Norte starting in the fourth quarter of 2019 from the calculation of realized price per ounce. These assets are producing incidental ounces as they reach the end of their mine lives.
d. Represents cumulative catch-up adjustment to revenue relating to our streaming arrangements. Refer to note 2f to the Financial Statements for more information.
e.Realized price per ounce/pound may not calculate based on amounts presented in this table due to rounding.
BARRICK YEAR-END 2020
99
MANAGEMENT’S DISCUSSION AND ANALYSIS


Technical Information

The scientific and technical information contained in this MD&A has been reviewed and approved by Steven Yopps, MMSA, Manager of Growth Projects, Nevada Gold Mines; Craig Fiddes, SME-RM, Manager – Resource Modeling, Nevada Gold Mines; Chad Yuhasz, P.Geo, Mineral Resource Manager, Latin America & Asia Pacific; Simon Bottoms, CGeol, MGeol, FGS, FAusIMM, Mineral Resources Manager: Africa & Middle East; Rodney Quick, MSc, Pr. Sci.Nat, Mineral Resource Management and Evaluation Executive; John Steele, CIM, Metallurgy, Engineering and Capital Projects Executive; and Rob Krcmarov, FAusIMM, Executive Vice President, Exploration and Growth – each a “Qualified Person” as defined in National Instrument 43-101 – Standards of Disclosure for Mineral Projects.
All mineral reserve and mineral resource estimates are estimated in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects. Unless otherwise noted, such mineral reserve and mineral resource estimates are as of December 31, 2020.

Endnotes 

1A Tier One Gold Asset is an asset with a reserve potential to deliver a minimum 10-year life, annual production of at least 500,000 ounces of gold and total cash costs per ounce over the mine life that are in the lower half of the industry cost curve.
2A Tier Two Gold Asset is an asset with a reserve potential to deliver a minimum 10-year life, annual production of at least 250,000 ounces of gold and total cash costs per ounce over the mine life that are in the lower half of the industry cost curve. A Strategic Asset is an asset which in the opinion of Barrick, has the potential to deliver significant unrealized value in the future.
3Currently consists of Barrick’s Lumwana mine and Zaldívar and Jabal Sayid copper joint ventures.
4These are non-GAAP financial performance measures with no standardized meaning under IFRS and therefore may not be comparable to similar measures presented by other issuers. For further information and a detailed reconciliation of each non-GAAP measure to the most directly comparable IFRS measure, please see pages 96 to 122 of this MD&A.
5Cost of sales applicable to gold per ounce is calculated using cost of sales applicable to gold on an attributable basis (removing the non-controlling interest of 40% Pueblo Viejo, 16% North Mara, Bulyanhulu and Buzwagi starting January 1, 2020, the date the GoT’s 16% free carried interest was made effective (36.1% from January 1, 2018 to September 30, 2019; notwithstanding the completion of the Acacia transaction on September 17, 2019, we consolidated our interest in Acacia and recorded a non-controlling interest of 36.1% in the income statement for the entirety of the third quarter of 2019 as a matter of convenience); and 63.1% South Arturo from cost of sales from July 1, 2019 onwards as a result of its contribution to Nevada Gold Mines (and on a 40% basis from January 1, 2018 to June 30, 2019), divided by attributable gold ounces.
Commencing January 1, 2019, the effective date of the Merger, the non-controlling interest of 20% Loulo-Gounkoto and 10.3% Tongon is also removed from cost of sales and our proportionate share of cost of sales attributable to equity method investments (Kibali, and Morila until the second quarter of 2019) is included. Cost of sales applicable to gold per ounce also removes the non-controlling interest of 38.5% Nevada Gold Mines from July 1, 2019 onwards. Cost of sales applicable to copper per pound is calculated using cost of sales applicable to copper including our proportionate share of cost of sales attributable to equity method investments (Zaldívar and Jabal Sayid), divided by consolidated copper pounds (including our proportionate share of copper pounds from our equity method investments).
6Total reportable incident frequency rate (“TRIFR”) is a ratio calculated as follows: number of reportable injuries x 1,000,000 hours divided by the total number of hours worked. Reportable injuries include fatalities, lost time injuries, restricted duty injuries, and medically treated injuries. Lost time injury frequency rate (“LTIFR”) is a ratio calculated as follows: number of lost time injuries x 1,000,000 hours divided by the total number of hours worked.
7Class 1 - High Significance is defined as an incident that causes significant negative impacts on human health or the environment or an incident that extends onto publicly accessible land and has the potential to cause significant adverse impact to surrounding communities, livestock or wildlife.
8All mineral resource and mineral reserve estimates of tonnes, Au oz, Ag oz and Cu lb are reported to the second significant digit. All measured and indicated mineral resource estimates of grade and all proven and probable mineral reserve estimates of grade for Au g/t, Ag g/t and Cu % are reported to two decimal places. All inferred mineral resource estimates of grade for Au g/t, Ag g/t and Cu % are reported to one decimal place. 2020 polymetallic mineral resources
BARRICK YEAR-END 2020
100
MANAGEMENT’S DISCUSSION AND ANALYSIS


and mineral reserves are estimated using the combined value of gold, copper & silver and accordingly are reported as Gold, Copper & Silver mineral resources and mineral reserves.
9Estimated in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects as required by Canadian securities regulatory authorities. Estimates are as of December 31, 2020, unless otherwise noted. Proven reserves of 280 million tonnes grading 2.37 g/t, representing 21 million ounces of gold, and 350 million tonnes grading 0.39%, representing 3,000 million pounds of copper. Probable reserves of 990 million tonnes grading 1.46 g/t, representing 47 million ounces of gold, and 1,100 million tonnes grading 0.39%, representing 9,700 million pounds of copper. Measured resources of 530 million tonnes grading 2.11 g/t, representing 36 million ounces of gold, and 600 million tonnes grading 0.36%, representing 4,800 million pounds of copper. Indicated resources of 2,800 million tonnes grading 1.41 g/t, representing 130 million ounces of gold, and 2,500 million tonnes grading 0.36%, representing 20,000 million pounds of copper. Inferred resources of 980 million tonnes grading 1.4 g/t, representing 43 million ounces of gold, and 440 million tonnes grading 0.2%, representing 2,200 million pounds of copper. Complete mineral reserve and mineral resource data for all mines and projects referenced in this MD&A, including tonnes, grades, and ounces, can be found on pages 136-143 of Barrick’s Fourth Quarter and Year-End 2020 Report.
10Estimated in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects as required by Canadian securities regulatory authorities. Estimates are as of December 31, 2019, unless otherwise noted. Proven reserves of 280
million tonnes grading 2.42 g/t, representing 22 million ounces of gold, and 420 million tonnes grading 0.4%, representing 3,700 million pounds of copper. Probable reserves of 1,000 million tonnes grading 1.48 g/t, representing 49 million ounces of gold, and 1,200 million tonnes grading 0.38%, representing 9,800 million pounds of copper. Measured resources of 530 million tonnes grading 2.21 g/t, representing 37 million ounces of gold, and 660 million tonnes grading 0.38%, representing 5,500 million pounds of copper. Indicated resources of 2,800 million tonnes grading 1.43 g/t, representing 130 million ounces of gold, and 2,400 million tonnes grading 0.38%, representing 21,000 million pounds of copper. Inferred resources of 940 million tonnes grading 1.3 g/t, representing 39 million ounces of gold, and 430 million tonnes grading 0.2%, representing 2,200 million pounds of copper. Complete 2019 mineral reserve and mineral resource data for all mines and projects referenced in this MD&A, including tonnes, grades, and ounces, can be found on pages 33-44 of Barrick’s Annual Information Form/Form 40-F for the year ended December 31, 2019 on file with Canadian provincial securities regulatory authorities and the U.S. Securities and Exchange Commission.
11See the Technical Report on the Turquoise Ridge mine, dated March 19, 2019, and filed on SEDAR at www.sedar.com and EDGAR at www.sec.gov on March 23, 2019.
12See the Technical Report on the Pueblo Viejo mine, Sanchez Ramirez Province, Dominican Republic, dated March 19, 2018, and filed on SEDAR at www.sedar.com and EDGAR at www.sec.gov on March 23, 2018.
13Carlin Trend Significant Interceptsa
Drill Results from Q4 2020
Drill Holeb
Azimuth Dip Interval (m)
Width (m)c
Au (g/t)
58.5 - 63.7 5.2 7.10
LUC-03265 244 (60) 176.2 - 188.4 12.2 10.60
LUC-03268 298 (59) 103.0 - 113.7 10.67 11.09
175.7 - 188.4 12.65 17.29
210.0 - 213.0 3 8.91
LUC-03269A 343 (60) 336.5 - 345.3 8.84 6.16
a.All intercepts calculated using a 3.4 g/t Au cutoff and are uncapped; minimum intercept width is 3.0 m; internal dilution is less than 20% total width.
b.Carlin Trend drill hole nomenclature: Project area (LUC - Leeville Underground Core) followed by a 5-digit hole number.
c.True widths of intercepts are uncertain at this stage.
The drilling results for the Carlin Trend contained in this MD&A have been prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects. All drill hole assay information has been manually reviewed and approved by staff geologists and re-checked by the project manager. Sample preparation and analyses are conducted by an independent laboratory, ALS Minerals. Procedures are employed to ensure security of samples during their delivery from the drill rig to the laboratory. The quality assurance procedures, data verification and assay protocols used in connection with drilling and sampling on the Carlin Trend conform to industry accepted quality control methods.

BARRICK YEAR-END 2020
101
MANAGEMENT’S DISCUSSION AND ANALYSIS


14 Carlin Trend Significant Interceptsa
Drill Results from Q4 2020
Drill Holeb
Azimuth Dip Interval (m)
Width (m)c
Au (g/t)
NVX-20001 207 (69) 269.1 - 271.9 2.7 8.6
482.9 - 486.6 3.7 14.7
489.8 - 492.7 2.9 17.1
PGX-20005 256 (52) 503.2 - 504.6 1.4 6.6
a.All intercepts calculated using a 5 g/t Au cutoff and are uncapped; minimum intercept width is 0.8 m; internal dilution is less than 20% total width.
b.Carlin Trend drill hole nomenclature: Project area (PGX - Post-Gen, NVX - Nova) followed by the year (20 for 2020) then hole number.
c.True widths of intercepts are uncertain at this stage.
The drilling results for the Carlin Trend contained in this MD&A have been prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects. All drill hole assay information has been manually reviewed and approved by staff geologists and re-checked by the project manager. Sample preparation and analyses are conducted by an independent laboratory, ALS Minerals. Procedures are employed to ensure security of samples during their delivery from the drill rig to the laboratory. The quality assurance procedures, data verification and assay protocols used in connection with drilling and sampling on the Carlin Trend conform to industry accepted quality control methods.

15 North Leeville Significant Interceptsa
Drill Results from Q4 2020
Drill Holeb
Azimuth Dip Interval (m)
Width (m)c
Au (g/t)
CGX-20077 105 (67) 813.5 - 816.6 3.1 7.1
CGX-20078d
106 (67) 756.5 - 789.4 32.9 16.9
CGX-20079d
280 (80) 813.5 - 825.8 12.3 18.3
CGX-20081d,e
0 (90) 899.7 - 931.1 31.4 1.0
a.All intercepts calculated using a 3.4 g/t Au cutoff and are uncapped; minimum intercept width is 3.0 m; internal dilution is less than 20% total width.
b.Carlin Trend drill hole nomenclature: Project area (CGX - Leeville) followed by the year (20 for 2020) then hole number.
c.True widths of intercepts are uncertain at this stage.
d.Partial results received; additional results expected in Q1 2021.
e.No significant >3.4 g/t intercept; low-grade intercept calculated using 0.5 g/t Au cutoff and uncapped; internal dilution is less than 20% total width.
The drilling results for North Leeville contained in this MD&A have been prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects. All drill hole assay information has been manually reviewed and approved by staff geologists and re-checked by the project manager. Sample preparation and analyses are conducted by an independent laboratory, ALS Minerals. Procedures are employed to ensure security of samples during their delivery from the drill rig to the laboratory. The quality assurance procedures, data verification and assay protocols used in connection with drilling and sampling on North Leeville conform to industry accepted quality control methods.

BARRICK YEAR-END 2020
102
MANAGEMENT’S DISCUSSION AND ANALYSIS


16 Leeville Significant Interceptsa
Drill Results from Q3 2020
Drill Holeb
Azimuth Dip Interval (m)
Width (m)c
Au (g/t)
115.5 - 118.5 3 8.1
145.7 - 156.7 11 6.4
158.8 - 163.4 4.6 10.9
LUC-03220 (347) (61) 174.3 - 178.3 4 7.8
110.9 - 134.9 24 11.1
141.4 - 149.0 7.6 6.9
LUC-03221 360 (54) 156.8 - 189.0 32.2 14.9
89.9 - 94.5 4.6 14.4
129.5 - 146.3 16.8 7.3
LUC-03222 7 (62) 152.4 - 161.5 9.1 14.0
80.5 - 85.2 4.7 9.2
105.3 - 187.3 82 23.8
LUC-03223d
25 (60) 202.7 - 205.7 3 10.6
119.0 - 127.7 8.7 11.3
LUC-03238 340 (53) 130.0 - 141.4 11.4 16.2
135.0 - 141.4 6.4 11.6
152.4 - 167.9 15.5 6.2
LUC-03239 40 (55) 170.7 - 176.2 5.5 5.6
202.1 - 205.1 3 6.3
LUC-03240 50 (50) 215.8 - 224.0 8.2 8.4
a.All intercepts calculated using a 3.4 g/t Au cutoff and are uncapped; minimum intercept width is 3.0 m; internal dilution is less than 20% total width.
b.Carlin Trend drill hole nomenclature: Project area (LUC - Leeville underground core) followed by a 5-digit hole number.
c.True widths of intercepts are uncertain at this stage.
d.LUC-03223 intercept runs sub-parallel to the mineralized structure
The drilling results for Leeville contained in this MD&A have been prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects. All drill hole assay information has been manually reviewed and approved by staff geologists and re-checked by the project manager. Sample preparation and analyses are conducted by an independent laboratory, ALS Minerals. Procedures are employed to ensure security of samples during their delivery from the drill rig to the laboratory. The quality assurance procedures, data verification and assay protocols used in connection with drilling and sampling on Leeville conform to industry accepted quality control methods.

17 CHUG Significant Interceptsa
Drill Results from 2020
Drill Holeb
Azimuth Dip Interval (m)
Width (m)c
Au (g/t)
316.7 - 324.5 7.8 7.8
CHMX-068 242.9 (57.1) 387.5 - 396.2 8.7 4.8
a.All intercepts calculated using a 3.43 g/t Au cutoff and are uncapped; minimum intercept width is 3.0 m; maximum dilution is 6.1m.
b.Cortez Hills Underground drill hole nomenclature: CHMX (Cortex Hills Minex) with no designation of the year.
c.True widths of intercepts are uncertain at this stage.
The drilling results for the Cortez property contained in this MD&A have been prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects. All drill hole assay information has been manually reviewed and approved by staff geologists and re-checked by the project manager. Sample preparation and analyses are conducted by an independent laboratory, ALS Minerals. Procedures are employed to ensure security of samples during their delivery from the drill rig to the laboratory. The quality assurance procedures, data verification and assay protocols used in connection with drilling and sampling on the Cortez property conform to industry accepted quality control methods.

BARRICK YEAR-END 2020
103
MANAGEMENT’S DISCUSSION AND ANALYSIS


18 Fourmile Significant Interceptsa
Drill Results from Q4 2020
Drill Holeb
Azimuth Dip Interval (m)
Width (m)c
Au (g/t)
FM20-159Dd
23 (76) 295.6 - 297.3 1.7 8.0
FM20-171De
67 (68) 1378.7 - 1382.4 3.7 15.0
FM20-172De
110 (65) no intercepts > 5 g/t
FM20-173D e
112 (70) 328.9 - 330.1 1.2 9.9
a.All intercepts calculated using a 5 g/t Au cutoff and are uncapped; minimum intercept width is 0.8 m; internal dilution is less than 20% total width.
b.Fourmile drill hole nomenclature: FM (Fourmile) followed by the year (20 for 2020).
c.True widths of intercepts are uncertain at this stage.
d.Partial results reported in Q2 2020, all results are final now.
e.Partial results.
The drilling results for the Fourmile property contained in this MD&A have been prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects. All drill hole assay information has been manually reviewed and approved by staff geologists and re-checked by the project manager. Sample preparation and analyses are conducted by ALS Minerals. Procedures are employed to ensure security of samples during their delivery from the drill rig to the laboratory. The quality assurance procedures, data verification and assay protocols used in connection with drilling and sampling on the Fourmile property conform to industry accepted quality control methods.

19 Bambadji Significant Interceptsa
Drill Results from Q4 2020
Drill Holeb
Azimuth Dip Interval (m)
Width (m)c
Au (g/t)
KBWDH003 135 (55) 130.30 - 149.00 18.70 1.15
KBWDH004 135 (55) 168.70 - 178.70 10.00 0.51
KBWDH005 135 (55) 138.80 - 149.30 10.50 4.24
KBWDH005 135 (55) 160.30 - 163.30 3.00 13.26
KBWRC018 135 (55) 90.00 - 140.00 50.00 2.08
LFDH002 90 (50) 151.00 - 170.00 19.00 0.67
LFDH003 90 (50) 117.80 - 142.5 24.70 0.52
LFRC004 90 (50) 117.00 - 126.00 9.00 0.55
LFRC004 90 (50) 131.00 - 134.00 3.00 0.67
LFRC007 90 (50) 8.00 - 22.00 14.00 1.26
LFRC007 90 (50) 28.00 - 34.00 6.00 0.74
LFRC007 90 (50) 51.00 - 66.00 15.00 0.55
LFRC010 90 (50) 55.00 - 58.00 3.00 1.03
LFRC012 90 (50) 61.00 - 69.00 8.00 1.18
LFRC013 90 (50) 36.00 - 42.00 6.00 1.59
LFRC014 90 (50) 41.00 - 51.00 10.00 1.54
a.All intercepts calculated using a 0.5 g/t Au cutoff and are uncapped; minimum intercept width is 2 m; internal dilution is less than 2 m total width.
b.Drill hole nomenclature: KBW (Kabewest), LF (Latifa) followed by type of drilling RC (Reverse Circulation) and DH (Diamond Drilling).
c.True widths uncertain at this stage.
The drilling results for the Bambadji property contained in this MD&A have been prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects. All drill hole assay information has been manually reviewed and approved by staff geologists and re-checked by the project manager. Sample preparation and analyses are conducted by SGS, an independent laboratory. Industry accepted best practices for preparation and fire assaying procedures are utilized to determine gold content. Procedures are employed to ensure security of samples during their delivery from the drill rig to the laboratory. The quality assurance procedures, data verification and assay protocols used in connection with drilling and sampling on the Bambadji property conform to industry accepted quality control methods.


BARRICK YEAR-END 2020
104
MANAGEMENT’S DISCUSSION AND ANALYSIS


20 Loulo-Gounkoto Significant Interceptsa
Drill Results from Q4 2020
Drill Holeb
Azimuth Dip Interval (m)
Width (m)c
Au (g/t)
DB1RC022 230.83 (52) 155.00 - 157.00 2.00 1.20
50.83 (58) 115.00 - 117.00 2.00 1.66
50.83 (58) 150.00 - 154.00 4.00 2.20
DB1RC024 50.83 (58) 159.00 - 164.00 5.00 1.75
DB1RC025 50.83 (66) 32.00 - 35.00 3.00 0.62
232.83 (53) 58.00 - 60.00 2.00 0.89
232.83 (53) 67.00 - 72.00 5.00 2.66
232.83 (53) 81.00 - 84.00 3.00 1.68
DB1RC027 232.83 (53) 105.00 - 107.00 2.00 0.91
232.83 (55) 263.00 - 265.00 2.00 0.78
DB1RC029 232.83 (55) 268.00 - 270.00 2.00 9.15
242.51 (51.73) 248.00 - 252.00 4.00 2.91
DB1RCDH020 242.51 (51.73) 255.00 - 260.00 5.00 0.67
37.95 (81.02) 1259.40 - 1263.50 4.10 0.60
YDH300 37.95 (81.02) 1364.30 - 1380.65 16.35 3.37
176.83 (55) 16.40 - 19.00 2.60 0.91
176.83 (55) 146.60 - 151.80 5.20 1.07
176.83 (55) 152.60 - 157.60 5.00 18.09
176.83 (55) 161.00 - 163.65 2.65 1.19
176.83 (55) 167.70 - 170.98 3.28 0.73
176.83 (55) 173.50 - 182.20 8.70 7.47
176.83 (55) 185.40 - 189.30 3.90 12.30
176.83 (55) 193.05 - 197.70 4.65 6.66
176.83 (55) 201.50 - 203.50 2.00 1.48
176.83 (55) 205.70 - 208.60 2.90 1.44
176.83 (55) 219.10 - 221.30 2.20 0.83
176.83 (55) 228.40 - 231.45 3.05 0.71
YRDH010 176.83 (55) 242.55 - 245.00 2.45 0.96
154.83 (51) 12.20 - 19.40 7.20 4.93
154.83 (51) 20.30 - 23.55 3.25 4.33
154.83 (51) 57.40 - 64.20 6.80 0.98
154.83 (51) 68.55 - 74.00 5.45 3.91
YRDH011 154.83 (51) 141.60 - 145.30 3.70 0.70
156.5 (52.9) 4.25 - 6.30 2.05 1.53
156.5 (52.9) 54.57 - 57.70 3.13 2.54
156.5 (52.9) 93.60 - 96.15 2.55 3.95
156.5 (52.9) 110.60 - 112.60 2.00 1.04
156.5 (52.9) 122.60 - 130.50 7.90 1.92
156.5 (52.9) 187.20 - 191.55 4.35 1.95
156.5 (52.9) 193.45 - 195.50 2.05 3.07
YRDH012 156.5 (52.9) 199.28 - 203.23 3.95 1.14
164.66 (50.82) 0.00 - 2.00 2.00 1.34
164.66 (50.82) 7.00 - 14.00 7.00 2.67
164.66 (50.82) 15.00 - 22.00 7.00 0.73
164.66 (50.82) 29.00 - 34.00 5.00 1.14
164.66 (50.82) 57.00 - 60.00 3.00 0.97
164.66 (50.82) 70.00 - 76.00 6.00 1.52
164.66 (50.82) 120.00 - 130.00 10.00 2.26
164.66 (50.82) 132.00 - 134.00 2.00 0.52
164.66 (50.82) 153.00 - 156.00 3.00 1.11
164.66 (50.82) 157.15 - 161.45 4.30 1.56
BARRICK YEAR-END 2020
105
MANAGEMENT’S DISCUSSION AND ANALYSIS


164.66 (50.82) 207.15 - 213.30 6.15 1.31
164.66 (50.82) 224.50 - 229.30 4.80 1.58
164.66 (50.82) 251.15 - 255.55 4.40 9.01
164.66 (50.82) 279.10 - 282.05 2.95 0.83
164.66 (50.82) 303.20 - 310.00 6.80 0.91
164.66 (50.82) 337.00 - 340.30 3.30 0.59
164.66 (50.82) 352.20 - 355.00 2.80 0.53
YRRCDH001 164.66 (50.82) 357.20 - 365.95 8.75 1.12
164.8 (52.8) 62.00 - 67.00 5.00 1.38
164.8 (52.8) 79.00 - 81.00 2.00 0.63
164.8 (52.8) 139.00 - 141.00 2.00 4.57
164.8 (52.8) 227.10 - 231.10 4.00 1.23
164.8 (52.8) 235.05 - 239.40 4.35 1.32
164.8 (52.8) 254.30 - 256.30 2.00 2.18
YRRCDH002 164.8 (52.8) 286.20 - 289.20 3.00 1.00
a.All intercepts calculated using a 0.5 g/t Au cutoff and are uncapped; minimum intercept width is 2 m; internal dilution is less than 2 m total width.
b.Loulo-Gounkoto drill hole nomenclature: Y/YA (Yalea), YR (Yalea Ridge), L3 (Loulo 3), GK (Gounkoto), GKUG (Gounkoto Undergroud), DB1 (Domain Boundary 1) followed by type of drilling RC (Reverse Circulation), DH (Diamond Drilling) and RCDH (RC/Diamond Tail).
c.True widths of intercepts are uncertain at this stage.
The drilling results for the Loulo-Gounkoto property contained in this MD&A have been prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects. All drill hole assay information has been manually reviewed and approved by staff geologists and re-checked by the project manager. Sample preparation and analyses are conducted by SGS, an independent laboratory. Industry accepted best practices for preparation and fire assaying procedures are utilized to determine gold content. Procedures are employed to ensure security of samples during their delivery from the drill rig to the laboratory. The quality assurance procedures, data verification and assay protocols used in connection with drilling and sampling on the Loulo property conform to industry accepted quality control methods.

21 Loulo-Gounkoto Significant Interceptsa
Drill Results from Q3 2020
Drill Holeb
Azimuth Dip Interval (m)
Width (m)c
Au (g/t)
DB1RC020 228.00 (51.00)  247.00 - 258.00 11.00 1.31
DB1RC022 226.33 (52.00)  155.00 - 157.00 2.00 1.20
DB1RC025 46.00 (66.00)  32.00 - 35.00 3.00 0.62
 417.25 - 419.25 2.00 6.24
L3DH255 220.02 (58.91)  423.65 - 428.20 4.55 1.46
 312.70 - 316.75 4.05 3.34
 329.00 - 331.75 2.75 8.36
L3DH256 237.71 (56.57)  333.80 - 336.60 2.80 2.57
 377.05 - 379.55 2.50 0.92
 382.25 - 385.20 2.95 7.02
 394.15 - 401.10 6.95 3.23
L3DH257 224.10 (78.82)  408.90 - 416.10 7.20 1.75
 490.20 - 503.90 13.70 6.41
L3DH258 215.16 (59.27)  506.90 - 510.90 4.00 22.11
 510.00 - 519.55 9.55 8.99
 523.15 - 528.00 4.85 2.82
 530.45 - 536.60 6.15 0.96
L3DH259 226.00 (69.00)  540.35 - 547.00 6.65 1.18
 633.30 - 644.15 10.85 2.86
 645.20 - 648.10 2.90 0.87
L3DH261 210.00 (60.00)  649.20 - 655.00 5.80 1.52
 644.40 - 646.55 2.15 2.96
 653.20 - 657.85 4.65 0.78
BARRICK YEAR-END 2020
106
MANAGEMENT’S DISCUSSION AND ANALYSIS


L3DH262 205.40 (66.76)  660.40 - 668.85 8.45 3.22
 582.75 - 593.85 11.10 8.77
 602.00 - 605.75 3.75 4.72
L3DH263 210.96 (55.13)  609.80 - 613.20 3.40 1.85
 681.80 - 695.35 13.55 2.08
L3DH264 208.45 (62.13)  703.25 - 707.35 4.10 1.67
 446.65 - 448.65 2.00 0.58
L3DH266 221.28 (61.00)  461.20 - 464.75 3.55 2.17
YADH147 68.98 (61.78)  902.60 - 907.30 4.70 1.98
 1,039.50 - 1,054.85 15.35 3.33
YADH149 69.92 (65.67)  1,055.65 - 1,069.60 13.95 4.85
 1,114.00 - 1,116.00 2.00 3.68
 1,122.80 - 1,143.00 20.20 4.77
 1,153.00 - 1,156.00 3.00 2.06
 1,167.50 - 1,169.50 2.00 8.42
 1,171.80 - 1,178.00 6.20 2.20
 1,181.00 - 1,185.85 4.85 1.68
YADH162 62.00 (64.00)  1,189.75 - 1,195.05 5.30 6.79
YADH165 70.00 (68.00)  982.15 - 1,000.70 18.55 2.35
 986.00 - 990.00 4.00 0.69
 996.50 - 1,001.80 5.30 1.17
YADH166 58.40 (68.02)  1,006.00 - 1,010.80 4.80 4.20
 1,077.00 - 1,084.00 7.00 3.20
YADH167 67.05 (64.06)  1,088.90 - 1,099.15 10.25 5.52
 833.00 - 837.00 4.00 5.35
 877.00 - 879.00 2.00 0.69
 885.20 - 888.80 3.60 2.25
 894.00 - 896.00 2.00 0.78
YADH168 67.00 (63.00)  1,000.75 - 1,009.00 8.25 6.58
 979.70 - 982.70 3.00 0.53
 1,015.90 - 1,018.00 2.10 1.79
YADH169 70.52 (60.17)  1,038.40 - 1,045.90 7.50 2.35
 1,135.20 - 1,146.00 10.80 1.37
 1,153.90 - 1,159.20 5.30 0.56
 1,160.00 - 1,162.00 2.00 1.07
 1,168.90 - 1,171.00 2.10 1.16
 1,174.00 - 1,180.00 6.00 1.41
YADH170 67.00 (63.00)  1,196.00 - 1,200.00 4.00 1.27
 1,123.25 - 1,137.00 13.75 4.34
YADH171 63.31 (65.94)  1,144.00 - 1,160.00 16.00 2.33
 1,220.00 - 1,229.65 9.65 2.43
 1,232.10 - 1,239.00 6.90 1.47
 1,241.80 - 1,255.00 13.20 3.14
YADH66 60.00 (65.00)  1,261.00 - 1,264.00 3.00 1.01
 1,020.00 - 1,029.00 9.00 1.68
 1,031.00 - 1,038.20 7.20 0.91
 1,040.20 - 1,042.40 2.20 0.87
 1,053.00 - 1,059.00 6.00 0.77
YADH67 60.00 (69.00)  1,061.70 - 1,064.40 2.70 0.71
 1,212.00 - 1,220.00 8.00 1.07
 1,223.00 - 1,225.00 2.00 0.85
 1,241.70 - 1,285.50 43.80 5.35
 1,286.30 - 1,314.45 28.15 10.21
 1,321.00 - 1,324.05 3.05 0.91
YDH298W1 59.20 (76.30)  1,327.10 - 1,343.00 15.90 3.69
BARRICK YEAR-END 2020
107
MANAGEMENT’S DISCUSSION AND ANALYSIS


 1,108.60 - 1,114.65 6.05 1.27
YDH298W2 59.28 (75.44)  1,138.60 - 1,153.90 15.30 2.23
 48.00 - 50.00 2.00 1.45
 57.00 - 63.00 6.00 3.00
 65.00 - 79.00 14.00 2.06
 83.00 - 85.00 2.00 0.65
 89.00 - 92.00 3.00 0.88
 116.00 - 128.00 12.00 3.02
 135.00 - 140.00 5.00 0.52
 146.00 - 153.00 7.00 0.77
YRRC005 150.00 (51.00)  161.00 - 167.00 6.00 0.91
 61.00 - 66.00 5.00 0.99
 69.00 - 71.00 2.00 1.53
 75.00 - 82.00 7.00 1.57
 93.00 - 106.00 13.00 1.56
 116.00 - 122.00 6.00 1.40
YRRC006 150.36 (50.46)  140.00 - 144.00 4.00 2.00
 0.00 - 2.00 2.00 1.34
 7.00 - 14.00 7.00 2.67
 15.00 - 22.00 7.00 0.73
 29.00 - 34.00 5.00 1.14
 57.00 - 60.00 3.00 0.97
 70.00 - 76.00 6.00 1.52
 120.00 - 130.00 10.00 2.26
YRRCDH001 164.66 (50.82)  132.00 - 134.00 2.00 0.52

a.All intercepts calculated using a 0.5 g/t Au cutoff and are uncapped; minimum intercept width is 2 m; internal dilution is equal to or less than 2 m total width.
b.Loulo – Gounkoto drill hole nomenclature: prospect initial Y/YA (Yalea), L3 (Loulo 3), GK (Gounkoto), GKUG (Gounkoto Underground), DB1 (Domain Boundary 1) followed by type of drilling RC (Reverse Circulation), DH (Diamond Drilling) RCDH (RC/Diamond Tail)
c.True widths uncertain at this stage.
The drilling results for the Loulo-Gounkoto property contained in this MD&A have been prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects. All drill hole assay information has been manually reviewed and approved by staff geologists and re-checked by the project manager. Sample preparation and analyses are conducted by SGS Laboratories, an independent laboratory. Industry accepted best practices for preparation and fire assaying procedures are utilized to determine gold content. Procedures are employed to ensure security of samples during their delivery from the drill rig to the laboratory. The quality assurance procedures, data verification and assay protocols used in connection with drilling and sampling on the Loulo property conform to industry accepted quality control methods.
BARRICK YEAR-END 2020
108
MANAGEMENT’S DISCUSSION AND ANALYSIS


22 Nielle Significant Interceptsa
Drill Results from Q4 2020
Drill Holeb
Azimuth Dip Interval (m)
Width (m)c
Au (g/t)
JBRC001 120 (50) 57.00 - 69.00 12.00 2.28
12.00 - 15.00 3.00 0.57
JBAC006 120 (50) 27.00 - 30.00 3.00 0.87
8.00 - 15.00 7.00 1.19
JBAC010 120 (50) 33.00 - 37.00 4.00 1.05
JBAC013 120 (50) 10.00 - 19.00 9.00 4.14
JBAC021 120 (50) 39.00 - 42.00 3.00 1.78
57.00 - 61.00 4.00 1.28
75.00 - 77.00 2.00 1.56
SNRC015 120 (50) 85.00 - 87.00 2.00 0.92
47.00 - 52.00 5.00 1.01
SNRC016 120 (50) 89.00 - 91.00 2.00 1.10
SNRC017 120 (50) 60.00 - 73.00 13.00 1.38
17.00 - 21.00 4.00 5.90
SNAC015 120 (50) 38.00 - 42.00 4.00 7.69
21.00 - 25.00 4.00 4.11
SNAC016 120 (50) 32.00 - 36.00 4.00 1.25
a.All intercepts calculated using a 0.5 g/t Au cutoff and are uncapped; minimum intercept width is 2 m; 2 m for maximum internal dilution.
b.Nielle drill hole nomenclature: prospect initial JB (Jubula), SN (Seydou North) followed by type of drilling RC (Reverse Circulation), AC (Air core).
c.True widths are uncertain at this stage.
The drilling results for the Nielle property contained in this MD&A have been prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects. All drill hole assay information has been manually reviewed and approved by staff geologists and re-checked by the project manager. Sample preparation and analyses are conducted by SGS, an independent laboratory. Industry accepted best practices for preparation and fire assaying procedures are utilized to determine gold content. Procedures are employed to ensure security of samples during their delivery from the drill rig to the laboratory. The quality assurance procedures, data verification and assay protocols used in connection with drilling and sampling on the Nielle property conform to industry accepted quality control methods.

BARRICK YEAR-END 2020
109
MANAGEMENT’S DISCUSSION AND ANALYSIS


23 Kibali Significant Interceptsa
Drill Results from Q4 2020
Including d
Drill Holeb
Azimuth Dip Interval (m)
Width (m)c
Au (g/t) Interval (m) Width (m) Au (g/t)
IVRC0272 0 (90) 148.00 - 154.00 6.00 8.66 152 - 154 2.00 20.05
9.00 - 13.00 4.00 1.67
IVRC0273 0 (90) 41.00 - 43.00 2.00 0.82
151.00 - 153.00 2.00 1.74
IVRC0274 0 (90) 228.00 - 230.00 2.00 1.20
IVRC0275 0 (90) 54.00 - 62.00 8.00 1.03
18.00 - 46.00 28.00 4.17 18 - 22 4.00 5.96
18.00 - 46.00 28.00 4.17 31 - 36 5.00 14.03
IVRC0276 0 (90) 80.00 - 84.00 4.00 0.68
146.00 - 150.00 4.00 2.63 146 - 147 1.00 4.00
IVRC0277 0 (90) 228.00 - 232.00 4.00 0.68
4.00 - 8.00 4.00 1.00
IVRC0279 0 (90) 16.00 - 20.00 4.00 2.69 18 - 20 2.00 4.24
26.00 - 28.00 2.00 2.00
IVRC0280 0 (90) 48.00 - 50.00 2.00 0.52
26.80 - 34.00 7.20 1.06
1368.60 - 1374.50 5.90 1.37
DDD603 125 (75) 1397.50 - 1409.00 11.50 0.99 1404 - 1406 2.00 2.45
a.All intercepts calculated using a 0.5 g/t Au cutoff and are uncapped; minimum intercept width is 2 m; internal dilution is equal to or less than 2 m total width.
b.Kibali drill hole nomenclature: prospect initial IV (Ikamva) followed by type of drilling RC (Reverse Circulation). KCD diamond holes use the DDD initial.
c.True widths uncertain at this stage.
d.All including intercepts, calculated using a 0.5 g/t Au cutoff and are uncapped, minimum intercept width is 1m, no internal dilution, with grade significantly above (>40%) the overall intercept grade.
The drilling results for the Kibali property contained in this MD&A have been prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects. All drill hole assay information has been manually reviewed and approved by staff geologists and re-checked by the project manager. Sample preparation and analyses are conducted by SGS, an independent laboratory. Industry accepted best practices for preparation and fire assaying procedures are utilized to determine gold content. Procedures are employed to ensure security of samples during their delivery from the drill rig to the laboratory. The quality assurance procedures, data verification and assay protocols used in connection with drilling and sampling on the Kibali property conform to industry accepted quality control methods.

24 Ngayu Significant Interceptsa
Drill Results from Q4 2020
Including d
Drill Holeb
Azimuth Dip Interval (m)
Width (m)c
Au (g/t) Interval (m) Width (m) Au (g/t)
140 (45) 39.80 - 48.90 9.10 3.75 41.0 - 42.0 1.0 8.48
ITDD0003 140 (45) 39.80 - 48.90 9.10 3.75 45.0 - 46.2 1.2 9.30
157 (50) 34.00 - 36.00 2.00 2.74
157 (50) 44.00 - 47.20 3.20 0.71
ADDD0001 157 (50) 51.80 - 61.00 9.20 1.83 56.7 - 57.9 1.2 9.94
139 (50) 11.40 - 13.70 2.30 1.36
139 (50) 26.30 - 31.00 4.70 0.78
139 (50) 34.10 - 52.50 18.40 2.64 34.1 - 46.0 11.9 3.04
139 (50) 34.10 - 52.50 18.40 2.64 49.3 - 52.5 3.2 3.14
ADDD0002 139 (50) 69.20 - 72.00 2.80 1.86
a.All intercepts calculated using a 0.5 g/t Au cutoff and are uncapped; minimum intercept width is 2 m; internal dilution is equal to or less than 2 m total width.
BARRICK YEAR-END 2020
110
MANAGEMENT’S DISCUSSION AND ANALYSIS


b.Ngayu drill hole nomenclature: prospect initial IT (Itali-Medere), AD (Andagbowa-Mokepa) followed by type of drilling DD (Diamond Drilling).
c.True widths uncertain at this stage.
d.Includings calculated using a 3.0 g/t Au cutoff and are uncapped; minimum intercept width is 2m; internal dilution is equal to or less than 25% total width.
The drilling results for the Ngayu property contained in this MD&A have been prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects. All drill hole assay information has been manually reviewed and approved by staff geologists and re-checked by the project manager. Sample preparation and analyses are conducted by SGS, an independent laboratory. Industry accepted best practices for preparation and fire assaying procedures are utilized to determine gold content. Procedures are employed to ensure security of samples during their delivery from the drill rig to the laboratory. The quality assurance procedures, data verification and assay protocols used in connection with drilling and sampling on the Ngayu property conform to industry accepted quality control methods.
BARRICK YEAR-END 2020
111
MANAGEMENT’S DISCUSSION AND ANALYSIS


Glossary of Technical Terms
 
ALL-IN SUSTAINING COSTS: A non-GAAP measure of cost per ounce/pound for gold/copper. Refer to page 99 of this MD&A for further information and a reconciliation of the measure.
AUTOCLAVE: Oxidation process in which high temperatures and pressures are applied to convert refractory sulfide mineralization into amenable oxide ore.
BY-PRODUCT: A secondary metal or mineral product recovered in the milling process such as silver.
C1 CASH COSTS: A non-GAAP measure of cost per pound for copper. Refer to page 118 of this MD&A for further information and a reconciliation of the measure.
CONCENTRATE: A very fine, powder-like product containing the valuable ore mineral from which most of the waste mineral has been eliminated.
CONTAINED OUNCES: Represents ounces in the ground before loss of ounces not able to be recovered by the applicable metallurgical process.
DEVELOPMENT: Work carried out for the purpose of gaining access to an ore body. In an underground mine, this includes shaft sinking, crosscutting, drifting and raising. In an open pit mine, development includes the removal of overburden (more commonly referred to as stripping in an open pit).
DILUTION: The effect of waste or low-grade ore which is unavoidably included in the mined ore, lowering the recovered grade.
DORÉ: Unrefined gold and silver bullion bars usually consisting of approximately 90 percent precious metals that will be further refined to almost pure metal.
DRILLING:
Core: drilling with a hollow bit with a diamond cutting rim to produce a cylindrical core that is used for geological study and assays.
Reverse circulation: drilling that uses a rotating cutting bit within a double-walled drill pipe and produces rock chips rather than core. Air or water is circulated down to the bit between the inner and outer wall of the drill pipe. The chips are forced to the surface through the center of the drill pipe and are collected, examined and assayed.
In-fill: drilling closer spaced holes in between existing holes, used to provide greater geological detail and to help establish reserve estimates.
Step-out: drilling to intersect a mineralized horizon or structure along strike or down-dip.
EXPLORATION: Prospecting, sampling, mapping, drilling and other work involved in searching for ore.
FREE CASH FLOW: A non-GAAP measure that reflects our ability to generate cash flow. Refer to page 97 of this MD&A for a definition.
GRADE: The amount of metal in each tonne of ore, expressed as grams per tonne (g/t) for precious metals and as a percentage for most other metals.
Cut-off grade: the minimum metal grade at which an ore body can be economically mined (used in the calculation of ore reserves).
Mill-head grade: metal content per tonne of ore going into a mill for processing.
Reserve grade: estimated metal content of an ore body, based on reserve calculations.
HEAP LEACHING: A process whereby gold/copper is extracted by “heaping” broken ore on sloping impermeable pads and continually applying to the heaps a weak cyanide solution/sulfuric acid which dissolves the contained gold/copper. The gold/copper-laden solution is then collected for gold/copper recovery.
HEAP LEACH PAD: A large impermeable foundation or pad used as a base for stacking ore for the purpose of heap leaching.
MILL: A processing facility where ore is finely ground and thereafter undergoes physical or chemical treatment to extract the valuable metals.
MINERAL RESERVE: See pages 136 to 143 – Summary Gold/Copper Mineral Reserves and Mineral Resources.
MINERAL RESOURCE: See pages 136 to 143 – Summary Gold/Copper Mineral Reserves and Mineral Resources.
OPEN PIT: A mine where the minerals are mined entirely from the surface.
ORE: Rock, generally containing metallic or non-metallic minerals, which can be mined and processed at a profit.
ORE BODY: A sufficiently large amount of ore that can be mined economically.
OUNCES: Troy ounce is a unit of measure used for weighing gold at 999.9 parts per thousand purity and is equivalent to 31.1035g.
RECLAMATION: The process by which lands disturbed as a result of mining activity are modified to support future beneficial land use. Reclamation activity may include the removal of buildings, equipment, machinery and other physical remnants of mining, closure of tailings storage facilities, leach pads and other mine features, and contouring, covering and re-vegetation of waste rock dumps and other disturbed areas.
RECOVERY RATE: A term used in process metallurgy to indicate the proportion of valuable material physically recovered in the processing of ore. It is generally stated as a percentage of the valuable material recovered compared to the total material originally contained in the ore.
REFINING: The final stage of metal production in which impurities are removed from the molten metal.
ROASTING: The treatment of sulfide ore by heat and air, or oxygen enriched air, in order to oxidize sulfides and remove other elements (carbon, antimony or arsenic).
STRIPPING: Removal of overburden or waste rock overlying an ore body in preparation for mining by open pit methods.
TAILINGS: The material that remains after all economically and technically recoverable precious metals have been removed from the ore during processing.
TOTAL CASH COSTS: A non-GAAP measure of cost per ounce for gold. Refer to page 99 of this MD&A for further information and a reconciliation of the measure.

BARRICK YEAR-END 2020
112
MANAGEMENT’S DISCUSSION AND ANALYSIS


Mineral Reserves and Mineral Resources
Gold Mineral Reserves1,2,3
As at December 31, 2020 PROVEN PROBABLE TOTAL
Tonnes Grade Contained ozs Tonnes Grade Contained ozs Tonnes Grade Contained ozs
Based on attributable ounces (Mt) (g/t) (Moz) (Mt) (g/t) (Moz) (Mt) (g/t) (Moz)
AFRICA AND MIDDLE EAST
Bulyanhulu underground (84.00%) 6.9  8.92  2.0 6.9  8.92 2.0 
Buzwagi surface (84.00%) 1.7  0.76  0.042  —  1.7  0.76 0.042 
Jabal Sayid surface 0.12 0.29  0.0012  —  0.12  0.29 0.0012 
Jabal Sayid underground 5.0 0.19  0.030  7.2  0.25 0.059 12  0.23 0.089 
Jabal Sayid (50.00%) total 5.1  0.19  0.031  7.2  0.25  0.059 12  0.23 0.090 
Kibali surface 3.4  2.68  0.29  11  2.40  0.84 14  2.47 1.1 
Kibali underground 5.7  5.32  0.98  14  4.61  2.1 20  4.81 3.1 
Kibali (45.00%) total 9.1  4.34  1.3  25  3.66 3.0 34  3.84 4.2 
Loulo-Gounkoto surface 8.3  2.88  0.77  8.4  3.54  0.95 17  3.21 1.7 
Loulo-Gounkoto underground 9.8  4.49  1.4  21  5.12  3.5 31  4.93 5.0 
Loulo-Gounkoto (80.00%) total 18  3.75  2.2  30  4.68  4.5 48  4.33 6.7 
North Mara surface 0.10  8.43  0.028  18  1.40  0.83 18  1.44  0.85 
North Mara underground 2.1  6.94  0.46  5.3  4.25  0.72 7.3  5.01  1.2 
North Mara (84.00%) total 2.2  7.01  0.49  24  2.04  1.5 26  2.46  2.0 
Tongon surface (89.70%) 4.1  1.62  0.21  5.2  2.15  0.36 9.3  1.92 0.57 
AFRICA AND MIDDLE EAST TOTAL
40  3.27  4.2  98  3.62  11 140  3.52  16 
LATIN AMERICA AND ASIA PACIFIC
Norte Abierto surface (50.00%) 110  0.65  2.4 480  0.59  9.2 600  0.60  12
Porgera surface4
9.2  3.66  1.1 9.2  3.66  1.1
Porgera underground4
1.1  6.79  0.24 5.1  6.25  1.0 6.3  6.34  1.3
Porgera (47.50%) total4
1.1  6.79  0.24 14  4.59  2.1 15  4.75  2.4
Pueblo Viejo surface (60.00%) 14  2.41  1.1 69  2.29  5.1 83  2.31  6.2
Veladero surface (50.00%) 11  0.45  0.15 97  0.78  2.4 110  0.75  2.6
LATIN AMERICA AND ASIA PACIFIC TOTAL
140  0.86  3.9 660  0.88  19 810  0.88  23
NORTH AMERICA
Carlin surface 41  2.62  3.4  51  1.89  3.1 91  2.21  6.5
Carlin underground 12  9.49  3.8  6.9  8.58  1.9 19  9.17  5.6
Carlin (61.50%) total5
53  4.22  7.2  57  2.69  5.0 110  3.42  12
Cortez surface 3.6  1.89  0.22  49  1.50  2.3 52  1.52  2.6
Cortez underground6
0.98  8.62  0.27  10  9.46  3.1 11  9.38  3.4
Cortez (61.50%) total 4.6  3.34  0.49  59  2.89  5.5 64  2.92  6.0
Hemlo surface 0.57  0.77  0.014  —  —  0.57  0.77  0.014
Hemlo underground 0.75  4.97  0.12  8.3  5.09  1.3 9.0  5.08  1.5
Hemlo (100%) total 1.3  3.15  0.13  8.3  5.09  1.3 9.6  4.82  1.5
Long Canyon surface (61.50%) 0.53  2.04  0.035  2.6  2.24  0.19 3.1 2.21  0.22
Phoenix surface (61.50%) 9.5  0.65  0.20  86  0.58  1.6 95  0.58  1.8
Turquoise Ridge surface 16  2.15  1.1  9.9  1.85  0.59 26  2.03  1.7
Turquoise Ridge underground 11  10.85  3.8  6.1  11.05  2.2 17  10.92  6.0
Turquoise Ridge (61.50%) total 27  5.72  4.9  16  5.34  2.7 43  5.58  7.7
NORTH AMERICA TOTAL
96  4.22  13  230  2.21  16 320  2.80  29
TOTAL
280   2.37   21   990   1.46   47 1,300   1.66   68
See “Mineral Reserves and Resources Endnotes”.
BARRICK YEAR-END 2020
113
RESERVES AND RESOURCES



Copper Mineral Reserves1,2,3,7
As at December 31, 2020 PROVEN PROBABLE TOTAL
Tonnes Cu Grade Contained Cu Tonnes Cu Grade Contained Cu Tonnes Cu Grade Contained Cu
Based on attributable pounds (Mt) (%) (Mlb) (Mt) (%) (Mlb) (Mt) (%) (Mlb)
AFRICA AND MIDDLE EAST
Bulyanhulu underground (84.00%) —  —  —  6.9 0.51 78 6.9 0.51 78
Jabal Sayid surface 0.12 2.70 7.3 —  —  —  0.12 2.70 7.3
Jabal Sayid underground 5.0 2.41 260 7.2 2.17 350 12 2.26 610
Jabal Sayid (50.00%) total 5.1 2.42 270 7.2 2.17 350 12 2.27 620
Lumwana surface (100%) 39 0.49 430 460 0.57 5,900 500 0.57 6,300
AFRICA AND MIDDLE EAST TOTAL
44 0.71 700 480 0.60 6,300 520 0.61 7,000
LATIN AMERICA AND ASIA PACIFIC
Norte Abierto surface (50.00%) 110 0.19 480 480 0.23 2,400 600 0.22 2,900
Zaldívar surface (50.00%) 170 0.46 1,700 62 0.41 560 230 0.45 2,300
LATIN AMERICA AND ASIA PACIFIC TOTAL
290 0.35 2,200 550 0.25 3,000 830 0.28 5,200
NORTH AMERICA
Phoenix surface (61.50%) 22 0.20 97 110 0.17 420 130 0.18 520
NORTH AMERICA TOTAL
22 0.20 97 110 0.17 420 130 0.18 520
TOTAL
350 0.39 3,000  1,100 0.39 9,700 1,500 0.39 13,000
See “Mineral Reserves and Resources Endnotes”.
Silver Mineral Reserves1,2,3,7
As at December 31, 2020 PROVEN PROBABLE TOTAL
Tonnes Ag Grade Contained Ag Tonnes Ag Grade Contained Ag Tonnes Ag Grade Contained Ag
Based on attributable ounces (Mt) (g/t) (Moz) (Mt) (g/t) (Moz) (Mt) (g/t) (Moz)
AFRICA AND MIDDLE EAST
Bulyanhulu underground (84.00%) —  —  —  6.9 6.27 1.4 6.9 6.27 1.4
AFRICA AND MIDDLE EAST TOTAL
—  —  —  6.9 6.27 1.4 6.9 6.27 1.4
LATIN AMERICA AND ASIA PACIFIC
Norte Abierto surface (50.00%) 110 1.91 7.0 480 1.43 22 600 1.52 29
Pueblo Viejo surface (60.00%) 14 12.01 5.5 69 15.81 35 83 15.16 40
Veladero surface (50.00%) 11 12.56 4.3 97 14.46 45 110 14.27 50
LATIN AMERICA AND ASIA PACIFIC TOTAL
140 3.75 17 650 4.91 100 790 4.70 120
NORTH AMERICA
Phoenix surface (61.50%) 9.5 7.83 2.4 86 6.90 19 95 6.99 21
NORTH AMERICA TOTAL
9.5 7.83 2.4 86 6.90 19 95 6.99 21
TOTAL
150 4.01 19 740 5.15 120 890 4.96 140
See “Mineral Reserves and Resources Endnotes”.

BARRICK YEAR-END 2020
114
RESERVES AND RESOURCES



Gold Mineral Resources1,2,3,8,9
As at December 31, 2020
MEASURED (M)10
INDICATED (I)10
(M) + (I)10
INFERRED 11
Tonnes Grade Contained ozs Tonnes Grade Contained ozs Contained ozs Tonnes Grade Contained ozs
Based on attributable ounces (Mt) (g/t) (Moz) (Mt) (g/t) (Moz) (Moz) (Mt) (g/t) (Moz)
AFRICA AND MIDDLE EAST
Bulyanhulu underground (84.00%) —  —  —  11 9.75 3.6 3.6 28 7.8 7.0
Buzwagi surface (84.00%) 1.7 0.76 0.042 3.4 1.25 0.14 0.18 —  —  — 
Jabal Sayid surface 0.12 0.29 0.0012 —  —  —  0.0012 —  —  — 
Jabal Sayid underground 4.6 0.21 0.031 9.8 0.36 0.11 0.14 2.3 0.4 0.028
Jabal Sayid (50.00%) total 4.7 0.21 0.032 9.8 0.36 0.11 0.14 2.3 0.4 0.028
Kibali surface 5.3 2.61 0.44 19 2.25 1.4 1.8 2.4 2.3 0.18
Kibali underground 13 4.85 2.0 25 4.00 3.2 5.1 5.1 3.0 0.50
Kibali (45.00%) total 18 4.19 2.4 44 3.23 4.6 7.0 7.5 2.8 0.67
Loulo-Gounkoto surface 9.8 2.83 0.89 12 3.22 1.3 2.1 3.1 2.3 0.23
Loulo-Gounkoto underground 17 4.50 2.5 25 5.32 4.3 6.9 16 3.4 1.7
Loulo-Gounkoto (80.00%) total 27 3.90 3.4 38 4.64 5.6 9.0 19 3.2 2.0
North Mara surface 21 2.00 1.3 28 1.58 1.4 2.7 11 1.3 0.48
North Mara underground 1.2 5.42 0.20 9.0 3.41 0.99 1.2 8.3 4.4 1.2
North Mara (84.00%) total 22 2.18 1.5 37 2.03 2.4 3.9 20 2.6 1.6
Tongon surface (89.70%) 4.6 1.80 0.27 6.9 2.36 0.52 0.79 2.5 2.6 0.21
AFRICA AND MIDDLE EAST TOTAL
78  3.07 7.7  150 3.51 17 25 79 4.5 11
LATIN AMERICA AND ASIA PACIFIC
Alturas surface (100%) —  —  —  —  —  —  —  260 1.1 8.9
Lagunas Norte surface (100%) 1.4 0.94 0.043 57 2.31 4.2 4.3 1.4 1.1 0.050
Norte Abierto surface (50.00%) 190 0.63 3.9 1,100 0.53 19 22 370 0.4 4.4
Pascua Lama surface (100%) 43 1.86 2.6 390 1.49 19 21 15 1.7 0.86
Porgera surface4
—  —  —  20 3.21 2.0 2.0 7.6 2.5 0.60
Porgera underground4
1.2 6.66 0.27 8.1 6.20 1.6 1.9 2.6 6.5 0.55
Porgera (47.50%) total4
1.2 6.66 0.27 28 4.09 3.6 3.9 10 3.5 1.1
Pueblo Viejo surface (60.00%) 67 2.10 4.5 150 2.07 10 15 41 1.8 2.4
Veladero surface (50.00%) 12 0.43 0.17 130 0.68 2.9 3.1 32 0.6 0.58
LATIN AMERICA AND ASIA PACIFIC TOTAL
320 1.12 11 1,800 0.98 58 70 730 0.8 18
See “Mineral Reserves and Resources Endnotes”.
BARRICK YEAR-END 2020
115
RESERVES AND RESOURCES



Gold Mineral Resources1,2,3,8,9
As at December 31, 2020
MEASURED (M)10
INDICATED (I)10
(M) + (I)10
INFERRED 11
Tonnes Grade Contained ozs Tonnes Grade Contained ozs Contained ozs Tonnes Grade Contained ozs
Based on attributable ounces (Mt) (g/t) (Moz) (Mt) (g/t) (Moz) (Moz) (Mt) (g/t) (Moz)
NORTH AMERICA
Carlin surface 49 2.45 3.9 140 1.50 6.8 11 12 1.1 0.42
Carlin underground 20 8.22 5.2 11 7.72 2.7 7.9 5.1 7.3 1.2
Carlin (61.50%) total5
69 4.09 9.0 150 1.94 9.5 19 17 3.0 1.6
Cortez surface 4.2 1.88 0.25 94 1.23 3.7 4.0 46 0.5 0.75
Cortez underground6
1.3 8.11 0.34 35 7.11 7.9 8.2 13 6.3 2.7
Cortez (61.50%) total 5.5 3.36 0.59 130 2.82 12 12 59 1.8 3.4
Donlin surface (50.00%) 3.9 2.52 0.31 270 2.24 19 20 46 2.0 3.0
Fourmile underground (100%) —  —  —  1.4 10.22 0.47 0.47 6.6 10.9 2.3
Hemlo surface 0.57  0.77  0.014  27 0.90 0.77 0.79 5.4 0.9 0.15
Hemlo underground 1.2 4.72 0.18 14 5.10 2.4 2.5 4.0 5.7 0.74
Hemlo (100%) total 1.7 3.42 0.19 41 2.37 3.1 3.3 9.4 3.0 0.90
Long Canyon surface 0.94 2.45 0.074 9.5 2.52 0.77 0.84 2.9 1.5 0.14
Long Canyon underground 0.083 11.84 0.032  0.99 9.76 0.31 0.34 0.13 7.4 0.031
Long Canyon (61.50%) total 1.0 3.21 0.11 10 3.21 1.1 1.2 3.0 1.7 0.17
Phoenix surface (61.50%) 17 0.56 0.30 180 0.50 3.0 3.3 14 0.4 0.21
Turquoise Ridge surface 27 2.13 1.8 24 1.97 1.5 3.4 10 1.8 0.60
Turquoise Ridge underground 13 10.92 4.5 7.3 10.95 2.6 7.1 1.8 10.1 0.58
Turquoise Ridge (61.50%) total 39 4.98 6.3 32 4.05 4.1 10 12 3.0 1.2
NORTH AMERICA TOTAL
140 3.83 17 820 1.99 52 69 170 2.4 13
TOTAL
530 2.11 36 2,800 1.41 130 160 980 1.4 43
See “Mineral Reserves and Resources Endnotes”.
BARRICK YEAR-END 2020
116
RESERVES AND RESOURCES



Copper Mineral Resources1,3,7,8,9
As at December 31, 2020
MEASURED (M)10
INDICATED (I)10
(M) + (I)10
INFERRED 11
Tonnes Grade Contained lbs Tonnes Grade Contained lbs Contained lbs Tonnes Grade Contained lbs
Based on attributable pounds (Mt) (%) (Mlb) (Mt) (%) (Mlb) (Mlb) (Mt) (%) (Mlb)
AFRICA AND MIDDLE EAST
Bulyanhulu underground (84.00%) —  —  —  11 0.49 120 120 28 0.5 280
Jabal Sayid surface 0.12 2.70 7.3 —  —  —  7.3 —  —  — 
Jabal Sayid underground 4.6 2.73 280 9.8 2.35 510 790 2.3 1.6 79
Jabal Sayid (50.00%) total 4.7 2.73 280 9.8 2.35 510 790 2.3 1.6 79
Lumwana surface (100%) 56 0.50 620 970 0.54 11,000 12,000 1.5 0.4 12
AFRICA AND MIDDLE EAST TOTAL
61 0.67 900 990 0.55 12,000 13,000 32 0.5 370
LATIN AMERICA AND ASIA PACIFIC
Norte Abierto surface (50.00%) 170 0.21 790 1,000 0.21 4,700 5,500 360 0.2 1,400
Zaldívar surface (50.00%) 330 0.40 2,900 270 0.38 2,300 5,200 31 0.4 270
LATIN AMERICA AND ASIA PACIFIC TOTAL
500 0.33 3,700 1,300 0.24 7,000 11,000 390 0.2 1,700
NORTH AMERICA
Phoenix surface (61.50%) 40 0.18 160 240 0.15 820 970 21 0.1 68
NORTH AMERICA TOTAL
40 0.18 160 240 0.15 820 970 21 0.1 68
TOTAL
600 0.36 4,800 2,500 0.36 20,000 25,000 440 0.2 2,200
See “Mineral Reserves and Resources Endnotes”.
BARRICK YEAR-END 2020
117
RESERVES AND RESOURCES



Silver Mineral Resources1,3,7,8,9
As at December 31, 2020
MEASURED (M)10
INDICATED (I)10
(M) + (I)10
INFERRED 11
Tonnes Ag Grade Contained Ag Tonnes Ag Grade Contained Ag Contained Ag Tonnes Ag Grade Contained Ag
Based on attributable ounces (Mt) (g/t) (Moz) (Mt) (g/t) (Moz) (Moz) (Mt) (g/t) (Moz)
AFRICA AND MIDDLE EAST
Bulyanhulu underground (84.00%) —  —  —  11 7.45 2.7 2.7 28 7.1 6.3
AFRICA AND MIDDLE EAST TOTAL
—  —  —  11  7.45 2.7  2.7  28  7.1 6.3 
LATIN AMERICA AND ASIA PACIFIC
Lagunas Norte surface (100%) 1.4 2.69 0.12 57 5.40 9.9 10 1.4 3.5 0.16
Norte Abierto surface (50.00%) 190 1.62 10 1,100 1.23 43 53 370 1.0 11
Pascua-Lama surface (100%) 43 57.21 79 390 52.22 660 740 15 17.8 8.8
Pueblo Viejo surface (60.00%) 67 10.62 23 150 11.96 59 82 41 7.8 10
Veladero surface (50.00%) 12 12.05 4.8 130 13.90 60 65 32 14.2 15
LATIN AMERICA AND ASIA PACIFIC TOTAL
320 11.49 120 1,800  14.20 830 950 460 3.1 45
NORTH AMERICA
Phoenix surface (61.50%) 16 7.01 3.7 180 6.28 37 41 14 5.9 2.6
NORTH AMERICA TOTAL
16 7.01 3.7 180  6.28 37 41 14 5.9 2.6
TOTAL
330 11.27 120 2,000  13.44 870 990 500 3.4 54
See “Mineral Reserves and Resources Endnotes”.


BARRICK YEAR-END 2020
118
RESERVES AND RESOURCES



Summary Gold Mineral Reserves1,2,3
For the years ended December 31 2020 2019
Ownership Tonnes Grade Ounces Ownership Tonnes Grade Ounces
Based on attributable ounces % (Mt) (g/t) (Moz) % (Mt) (g/t) (Moz)
AFRICA AND MIDDLE EAST
Bulyanhulu surface12
84.00% —  —  84.00% 1.1  1.19 0.041 
Bulyanhulu underground12
84.00% 6.9  8.92 2.0  84.00% 6.4  10.70 2.2 
Bulyanhulu Total12
84.00% 6.9  8.92 2.0  84.00% 7.5  9.34 2.2 
Buzwagi surface12
84.00% 1.7  0.76 0.042  84.00% 5.1  0.84 0.14 
Jabal Sayid surface 50.00% 12  0.23 0.090  50.00% 13  0.24 0.097 
Kibali surface 45.00% 14  2.47 1.1  45.00% 11  2.92 0.99 
Kibali underground 45.00% 20  4.81 3.1  45.00% 20  4.87 3.2 
Kibali Total
45.00% 34  3.84 4.2  45.00% 31  4.20 4.2 
Loulo-Gounkoto surface
80.00% 17  3.21 1.7  80.00% 18  3.28 1.9 
Loulo-Gounkoto underground 80.00% 31  4.93 5.0  80.00% 27  5.16 4.5 
Loulo-Gounkoto Total 80.00% 48  4.33 6.7  80.00% 45  4.41 6.4 
North Mara surface12
84.00% 18  1.44 0.85  84.00% 15  1.49 0.73 
North Mara underground12
84.00% 7.3  5.01 1.2  84.00% 5.8  5.40 1.0 
North Mara Total12
84.00% 26  2.46 2.0  84.00% 21  2.57 1.7 
Tongon surface 89.70% 9.3  1.92 0.57  89.70% 8.9  2.14 0.61 
Massawa surface13
83.25% 17  3.94 2.2 
AFRICA AND MIDDLE EAST TOTAL
140 3.52 16  150  3.69 18 
LATIN AMERICA AND ASIA PACIFIC
Lagunas Norte 100% —  —  —  100% —  —  — 
Norte Abierto surface 50.00% 600  0.60  12 50.00% 600  0.60  12.0
Porgera surface4
47.50% 9.2  3.66  1.1 47.50% 8.5  3.63  0.99
Porgera underground4
47.50% 6.3  6.34  1.3 47.50% 6.6  6.33  1.3
Porgera Total4
47.50% 15  4.75  2.4 47.50% 15  4.81  2.3
Pueblo Viejo surface 60.00% 83  2.31  6.2 60.00% 71  2.49  5.7
Veladero surface 50.00% 110  0.75  2.6 50.00% 120  0.73  2.8
LATIN AMERICA AND ASIA PACIFIC TOTAL
810  0.88  23 810  0.87  22
NORTH AMERICA
Carlin surface5
61.50% 91  2.21  6.5  61.50% 100  2.15  7.1
Carlin Underground5
61.50% 19  9.17  5.6  61.50% 19  9.59  5.9
Carlin Total5
61.50% 110  3.42  12  61.50% 120  3.32  13.0
Cortez surface 61.50% 52  1.52  2.6  61.50% 57  1.35  2.5
Cortez Underground6
61.50% 11  9.38  3.4  61.50% 11  9.91  3.6
Cortez Total 61.50% 64  2.92  6.0  61.50% 69  2.77  6.1
Hemlo surface 100% 0.57  0.77  0.014  100% 1.6  1.28  0.066
Hemlo underground 100% 9.0  5.08  1.5  100% 9.0  4.37  1.3
Hemlo Total 100% 9.6  4.82  1.5  100% 11  3.90  1.3
Long Canyon surface 61.50% 3.1  2.21  0.22  61.50% 4.9  2.48  0.39
Phoenix surface 61.50% 95  0.58  1.8  61.50% 100  0.59  2.0
Turquoise Ridge surface 61.50% 26  2.03  1.7  61.50% 34  1.95  2.1
Turquoise Ridge underground 61.50% 17  10.92  6.0  61.50% 18  10.90  6.2
Turquoise Ridge Total 61.50% 43  5.58  7.7  61.50% 51  5.02  8.3
NORTH AMERICA TOTAL
320  2.80  29  360  2.68  31
TOTAL
1,300  1.66 68  1,300  1.68  71
See “Mineral Reserves and Resources Endnotes”.

BARRICK YEAR-END 2020
119
RESERVES AND RESOURCES



Mineral Reserves and Resources Endnotes
1.Mineral reserves (“reserves”) and mineral resources (“resources”) have been estimated as at December 31, 2020 (unless otherwise noted) in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects (“NI 43-101”) as required by Canadian securities regulatory authorities. For United States reporting purposes, the SEC has adopted amendments to its disclosure rules to modernize the mineral property disclosure requirements for issuers whose securities are registered with the SEC under the Securities and Exchange Act of 1934, as amended (the “Exchange Act”). These amendments became effective February 25, 2019 (the “SEC Modernization Rules”) with compliance required for the first fiscal year beginning on or after January 1, 2021. The SEC Modernization Rules replace the historical property disclosure requirements for mining registrants that were included in SEC Industry Guide 7, which will be rescinded from and after the required compliance date of the SEC Modernization Rules. As a result of the adoption of the SEC Modernization Rules, the SEC now recognizes estimates of “measured”, “indicated” and “inferred” mineral resources. In addition, the SEC has amended its definitions of “proven mineral reserves” and “probable mineral reserves” to be substantially similar to the corresponding Canadian Institute of Mining, Metallurgy and Petroleum definitions, as required by NI 43-101. U.S. investors should understand that “inferred” mineral resources have a great amount of uncertainty as to their existence and great uncertainty as to their economic and legal feasibility. In addition, U.S. investors are cautioned not to assume that any part or all of Barrick’s mineral resources constitute or will be converted into reserves. Mineral resource and mineral reserve estimations have been prepared by employees of Barrick, its joint venture partners or its joint venture operating companies, as applicable, under the supervision of regional Mineral Resource Managers Simon Bottoms, Africa & Middle East Mineral Resource Manager and Chad Yuhasz, Latin America & Australia Pacific Mineral Resource Manager, Craig Fiddes, North America Resource Modeling Manager and reviewed by Rodney Quick, Barrick Executive Mineral Resource Management and Evaluation. Reserves have been estimated based on an assumed gold price of US$1,200 per ounce, an assumed silver price of US$16.50 per ounce, and an assumed copper price of US$2.75 per pound and long-term average exchange rates of 1.30 CAD/US$. Reserve estimates incorporate current and/or expected mine plans and cost levels at each property. Varying cut-off grades have been used depending on the mine and type of ore contained in the reserves. Barrick’s normal data verification procedures have been employed in connection with the calculations. Verification procedures include industry-standard quality control practices. Resources as at December 31, 2020 have been estimated using varying cut-off grades, depending on both the type of mine or project, its maturity and ore types at each property.
2.In confirming our annual reserves for each of our mineral properties, projects, and operations, we conduct a reserve test on December 31 of each year to verify that the future undiscounted cash flow from reserves is positive. The cash flow ignores all sunk costs and only considers future operating and closure expenses as well as any future capital costs.
3.All mineral resource and mineral reserve estimates of tonnes, Au oz, Ag oz and Cu lb are reported to the second significant digit.
4.Porgera mineral reserves and mineral resources are reported on a 47.5% interest basis, reflecting Barrick’s undisputed ownership position prior to April 24, 2020, and the ownership position Barrick is asserting in its legal proceedings in Papua New Guinea court. On August 16, 2019, the special mining lease (the “SML”) at Porgera was terminated and on April 24, 2020, the Government of Papua New Guinea indicated that the SML would not be extended. On October 15, 2020, Barrick Niugini Limited and Prime Minister Marape issued a joint press release indicating that they had productive discussions toward mutually acceptable arrangements for a new Porgera partnership to reopen and operate the mine going forward. It further indicated that the parties had agreed in principle that Papua New Guinea will take a major share of equity under the new arrangements, BNL will retain operatorship, and there will be a fair sharing of the economic benefits. Efforts to reach a memorandum of agreement to make these concepts and additional points binding are ongoing and, at this time, it is not certain when a binding memorandum of agreement will be reached by the parties or what the final terms will be (including Barrick’s percentage ownership interest in the Porgera mine). BNL remains in possession of the mine to conduct care and maintenance. For additional information, see page 36 of Barrick’s Fourth Quarter and Year End Report 2020.
5.Includes South Arturo on a 36.9% basis.
6.Cortez underground includes 3.9 million tonnes at 9.69 g/t for 1.2 million ounces of probable reserves, 26 million tonnes at 6.57 g/t for 5.5 million ounces of indicated resources and 12 million tonnes at 6.2 g/t for 2.5 million ounces of inferred resources related to Goldrush. As noted in endnote #8, mineral resources are reported on an inclusive basis.
7.2020 polymetallic mineral resources and mineral reserves are estimated using the combined value of gold, copper & silver and accordingly are reported as Gold, Copper & Silver mineral resources and mineral reserves.
8.Mineral resources which are not mineral reserves do not have demonstrated economic viability.
9.Mineral resources are reported inclusive of mineral reserves.
10.All measured and indicated mineral resource estimates of grade and all proven and probable mineral reserve estimates of grade for Au g/t, Ag g/t and Cu % are reported to two decimal places.
11.All inferred mineral resource estimates of grade for Au g/t, Ag g/t and Cu % are reported to one decimal place.
12.Formerly known as Acacia Mining plc. On September 17, 2019, Barrick acquired all of the shares of Acacia it did not already own, bringing its ownership of Bulyanhulu, North Mara, and Buzwagi up from 63.9% to 100%. On January 24, 2020, Barrick announced the signing of an agreement with the Government of Tanzania (“GoT”), through which, among other things, the GoT acquired a 16% free-carried interest in these sites, made effective January 1, 2020. For convenience, Barrick is reporting the 2019 mineral reserves and resources at 84% ownership interest.
13.On March 4, 2020, Barrick sold its interest in Massawa to Teranga Gold Corporation. For additional information, see page 36 of Barrick’s Fourth Quarter and Year End Report 2020.
BARRICK YEAR-END 2020
120
RESERVES AND RESOURCES