Exhibit 10.27

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES 1 26 2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (IF APPLICABLE) 0005 See Block 16C OS145103 6. ISSUED BY CODE ASPR-BARDA 7. ADMINISTERED BY (IF OTHER THAN ITEM 6) CODE ASPR-BARDA01 ASPR-BARDA 200 Independence Ave., S.W. Room 640-G Washington DC 20201 ASPR-BARDA 330 Independence Ave, SW Rm G644 Washington DC 20201 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code (x) 9A. AMENDMENT OF SOLICITATION NO. CEMPRA PHARMACEUTICALS, INC. 1425009 CEMPRA PHARMACEUTICALS, INC. BUILDING 4 QUADRANGLE 6340 QUADRANGLE DRIVE, SUITE 100 CHAPEL HILL NC 27517 9B. DATED (SEE ITEM 11) x 10a. MODIFICATION OF CONTRACT/ORDER NO. HHSO100201300009C CODE 1425009 FACILITY CODE 10B. DATED (SEE ITEM 13) 05/24/2013 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICIATIONS The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. Is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.  If by virtue of the amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. 12. ACCOUNTING AND APPROPRIATION DATA (If required) ..2015.1992015.25106 Net Increase: $15,999,772.37 13. This item only applies to modification of contracts/orders.  It modifies the contract/order no. as described in item 14. Check one A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A. B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b). C. THIS SUPPLIEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: D. OTHER (Specify type of modification and authority) X Bilateral: Mutual Agreement of the Parties and FAR Clause 52.217-9. E. IMPORTANT: Contractor is not. X is required to sign this document and return 0 copies to the issuing office. 14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section, headings, including solicitation/contract subject matter where feasible.) Tax ID Number: 20-3905814 DUNS Number: 623713034 A. The purpose of this modification is for the Government to bilaterally modify the Statement of Work requirements for Option 1 CLIN 0002 ONLY and then exercise Option 1 under CLIN 0002 of the contract in accordance with the terms and conditions of both Option 1 under CLIN 0002 and the contract.  The Government and the Contractor hereby modify this contract for the purposes of both adding and exercising the total amount of Option 1 under CLIN 0002 in the amount of: Total Estimated cost: $14,953,058.29 Total Fixed Fee: $1,046,714.08 Continued . . . Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect. 15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER ( Type or print) ETHAN J. MUELLER 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED (Signature of person authorized to sign) (Signature of Contracting Officer) NSN 7540-01-152-8070 Previous edition unusable STANDARD FORM 30 (REV. 10-83) Prescribed by GSA FAR (48 CFR) 53.243


 


 

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED HHSO100201300009C/0005 PAGE 2 OF 26 NAME OF OFFEROR OR CONTRACTOR CEMPRA PHARMACEUTICALS, INC. 1425009 ITEM NO. (A) SUPPLIES/SERVICES (B) QUANTITY (C) UNIT (D) UNITE PRICE (E) AMOUNT (F) Total Estimated Cost Plus Fixed Fee: $15,999,772.37 The total period of performance of Option 1 CLIN 0002 under the contract is from 14 November 2014 through 30 November 2016. 1. This modification hereby results in an increase in the total amount of the contract From $18,280,922.25 By $15,999,772.37 To $34,280,694.62 as well as the following: Total Estimated Cost of the Contract: From $17,122,296.17 By $14,953,058.29 To $32,075,354.46. Total Fixed Fee of the Contract: From $1,158,626.08 By $1,046,714.08 To $2,205,340.16. Total Estimated cost plus fixed fee of the contract: from $18,280,922.25 by $15,999,772.37 to $34,280,694.62. 2. In Block 14 of the SF 26, the following CAN Number is added: Appropriation Year: 2015, Object Class: 25106, can# 1992015 $15,999,772.37. 3. In Block 15G of the SF 26, the amount of $18,280,922.25 is hereby changed to $34,280694.62. 4. The Government and the Contractor bilaterally modify Attachment 1, Statement of Work dated 22 April 2013, under PART III, LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS, SECTION J – LIST OF ATTACHMENTS is hereby deleted and replaced with the attached Statement of Work dated 16 October 2014 (23 pages attached herein). The efforts within Option Period 1 under CLIN 0002 that involve clinical human trials/studies and not-clinical animal studies cannot be performed until the receipt and approval of all required protocols by BARDA inclusive of all IRB, OHRP approvals and any required approved OLAW Assurances and IIA approvals from OLAW for any non clinical animal studies. 5. The total amount, scope and period of performance of all other CLINs that are currently being performed under the contract remain unchanged.  This modification does not exercise any unexercised Option CLINs under the contract and does not authorize any performance of efforts under any unexercised Option CLINs under the contract.  In addition, the total amount, scope and period of performance of all unexercised Option CLINs under the contract remain unchanged. 6. This bilateral modification does not add any additional travel expenses to any CLINs under Contract Number HHSO100201300009C. Continued . . . NSN 7540-01-152-8067 OPTIONAL FORM 336 (486) Sponsored by GSA FAR (48 CFR) 53.110

 


 

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED HHSO100201300009C/0005 PAGE 3 OF 26 NAME OF OFFEROR OR CONTRACTOR CEMPRA PHARMACEUTICALS, INC. 1425009 ITEM NO. (A) SUPPLIES/SERVICES (B) QUANTITY (C) UNIT (D) UNIT PRICE (E) AMOUNT (F) 7. Under Article I.1, Section I Contract Clauses of the contract, the asterisk associated with HHSAR 352.231-70 salary rate limitation (Aug 2012) is deleted and replaced with the following: * The provisions set forth by this clause will only apply if and when any funds are obligated from HHS funding appropriated in the  2012, 2013, 2014 and 2015 Government Fiscal Years. B. This is a bilateral modification. All other terms and conditions remain unchanged. Delivery: 11/30/2016 Delivery Location Code: HHS HHS 200 Independence Avenue, SW Washington DC 20201 us Appr. Yr.: 2015 CAN: 1992015 Object Class: 25106 FOB: Destination Period of Performance: 05/24/2013 to 11/30/2016 Change item 2 to read as follows (amount shown is the obligated amount): 2 PK studies, safety studies, efficacy studies in animal models, clinical studies, regulatory and select chemical synthesis activities. 15,999,772.37 NSN 7540-01-152-8067 OPTIONAL FORM 336 (486) Sponsored by GSA FAR (48 CFR) 53.110

 

 

 


 

3.

STATEMENT OF WORK

3.1

Preamble

Independently and not as an agent of the Government, the Contractor shall be required to furnish all the necessary services, qualified personnel, material, equipment, and facilities, not otherwise provided by the Government, as needed to perform the Statement of Work submitted in response to Broad Agency Announcement (BAA) BARDA CBRN BAA-12-100-SOL-00011.

The Government reserves the right to modify the milestones, progress, schedule, budget, or product to add or delete products, process, or schedule as need may arise. Because of the nature of this (R&D) contract and complexities inherent in this and prior programs, at designated milestones the Government will evaluate whether work should be redirected, removed, or whether schedule or budget adjustments should be made. In any event, the Government reserves the right to change product, process, schedule, or event to add or delete part or all of these elements as the need arises.

3.2Overall Objectives and Scope

The overall objective of this contract is to advance the development of solithromycin (SOLI) as an intravenous (IV) and orally-delivered antibiotic for use in the pediatric population for the treatment of community-acquired bacterial pneumonia (CABP) and for protection against biothreat organisms, including Bacillus anthracis and Francisella tularensis. The scope of work is organized in 5 severable phases (Clinical Line Item Number [CLIN] 1 through 5):

Page 1 of 23


 

1. CLIN 1

The Contractor will carry out the following tasks and subtasks and in accordance with the agreed upon Integrated Master Schedule, which further details the conduct of the specific tasks and subtasks.

1.1

Program Management (WBS 1.1)

The Contractor outsources a majority of the work to established practitioners in each discipline, with the Contractor team providing experienced program management, coordination, and oversight. All selected purchased commercial service providers for the BARDA project have proven their ability to deliver quality work cost-effectively and on schedule. The Contractor shall provide for the following program management activities as outlined below:

1.1.1

The Contractor will provide overall management, integration and coordination of all contract activities, including a technical and administrative infrastructure to ensure the efficient planning, initiation, implementation, and direction of all contract activities.

1.1.2

The Principal Investigator is responsible for overall leadership for project management, communication, tracking, monitoring and reporting on status and progress, and modification to the project requirements and timelines, including projects undertaken by subcontractors.

1.1.3

The Project Manager will oversee the monitoring and tracking day-to-day progress and timelines, coordinating communication and project activities; costs incurred; and program management.

1.1.4

The Principal Investigator and the Project Manager will act as the BARDA Liaison with responsibility for effective communication with the Project Officer and Contracting Officer.

1.1.5

The Contractor has adequate administrative staff and legal consultants to provide development of compliant subcontracts, consulting, and other legal agreements, and ensure timely acquisition of all proprietary rights, including IP rights, and reporting all inventions made in the performance of the project.

1.1.6

The Contractor’s Project Management Team along with support from the Finance department has responsibility for financial management and reporting on all activities conducted by the Contractor and any subcontractors and service providers.

1.1.7

Contract Review Meetings

1.1.7.1

The Contractor’s team will participate in regular face-to-face meetings on a quarterly basis to coordinate and oversee the contract effort as directed by the Contracting and Project Officers. Such meetings may include, but are not limited to, meeting of the Contractor and subcontractors to discuss clinical manufacturing progress, product development, product assay development, scale up

 

 

 

Page 2 of 23


 

manufacturing development, clinical sample assays development, preclinical/clinical study designs and regulatory issues; meetings with individual Contractors and other HHS officials to discuss the technical, regulatory, and ethical aspects of the program; and meeting with technical consultants to discuss technical data provided by the Contractor.

1.1.7.2

The Contractor will participate in teleconferences every 2 weeks between the Contractor and BARDA to review technical progress. The Contractor will include subcontractors and service providers as necessary. If additional teleconferences or face-to-face meetings are requested by BARDA, the Contractor will be available.

1.1.8

Integrated Master Schedule (IMS)

1.1.8.1

Within 30 calendar days of the effective date of the contract, the Contractor will submit a first draft of an updated IMS in a format agreed upon by BARDA to the Project Officer and the Contracting Officer for review and comment. The Integrated Master Schedule will be incorporated into the contract, and will be used to monitor performance of the contract. The Contractor will include the key milestones and Go/No Go decision gates. The IMS for the period of performance will be reviewed and accepted by BARDA at the PMBR.

1.1.9

Integrated Master Plan (IMP)

1.1.10

Work Breakdown Structure: The Contractor will utilize a WBS template agreed upon by BARDA for reporting on the contact. The Contractor will expand and delineate the Contract Work Breakdown Structure (CWBS) to a level agreed upon by BARDA as part of their Integrated Master Plan for contract reporting. The CWBS will be discernible and consistent. At BARDA’s request, the Contractor will furnish WBS data at the work package level or at a lower level if there is significant complexity and risk associated with the task.

1.1.11

GO/ NO-GO Decision Gates/Contract Milestones: The IMP will outline key milestones with “Go/No Go” decision criteria (entrance and exit criteria for each phase of the project). The project plan should include, but not be limited to, milestones in manufacturing, non-clinical and clinical studies, and regulatory submissions.

1.1.12

Earned Value Management System Plan: Subject to the requirements under HHSAR Clause 352.234-4, the Contractor will use principles of Earned Value Management System (EVMS) in the management of this contract. The Contractor will follow the Seven Principles:

I. The Contractor will plan all work scope for the program to completion.

II. The Contractor will break down the program work scope into finite pieces that can be assigned to a responsible person or organization for control of technical, schedule, and cost objectives.

III. The Contractor will integrate program work scope, schedule, and cost objectives into a performance measurement baseline plan against which accomplishments may be measured.

Page 3 of 23


 

IV. The Contractor will use actual cost incurred and recorded in accomplishing the work performed.

V. The Contractor will objectively assess accomplishments at the work performance level.

VI. The Contractor will analyze significant variances from the plan, forecast impacts, and prepare an estimate at completion based on performance to date and work to be performed.

VII. The Contractor will use earned value information in the company’s management processes.

1.1.13

We understand that elements of EVMS will be applied to all applicable projects as part of the IMP. In addition, the Contractor will submit a written summary of the management procedures that will be used to establish, maintain and comply with EVMS requirements.

1.1.13.1

Decision Gate Reporting: On completion of a stage of the product development, as defined in the agreed upon IMS and IMP, the Contractor will prepare and submit to the Project Officer and the Contracting Officer a Decision Gate Report that contains (i) sufficient detail, documentation and analysis to support successful completion of the stage according to the predetermined qualitative and quantitative criteria that were established for Go/No Go decision making; and (ii) a description of the next stage of product development to be initiated and a request for approval to proceed to the next stage of product development.

1.1.14

Risk Management Plan: The Contractor will develop a risk management plan within 90 days of contract award highlighting potential problems and/or issues that may arise during the life of the contract, their impact on cost, schedule and performance, and appropriate remediation plans. This plan will reference relevant WBS elements where appropriate. Updates to this plan will be included every 3 months (quarterly) in the monthly Project Status Report.

1.1.15

Performance Measurement Baseline Review (PMBR): The Contractor will submit a plan for a PMBR to occur within 90 days of contract award. At the PMBR, the Contractor and BARDA will mutually agree upon the budget, schedule and technical plan baselines (Performance Measurement Baseline). These baselines will be the basis for monitoring and reporting progress throughout the life of the contract. The PMBR is conducted to achieve confidence that the baselines accurately capture the entire technical scope of work, are consistent with contract schedule requirements, are reasonably and logically planned, and have adequate resources assigned. The goals of the PMBR are as follows:

I. Jointly assess areas such as the Contractor’s planning for complete coverage of the SOW, logical scheduling of the work activities, adequate resources, and identification of inherent risks

II. Confirm the integrity of the Performance Measurement Baseline (PMB)



Page 4 of 23


 

III. Foster the use of EVM as a means of communication

IV. Provide confidence in the validity of the Contractor’s reporting

V. Identify risks associated with the PMB

VI. Present any revised PMBs for mutual agreement

VII. Present an IMS: The Contractor will deliver an initial program IMS that rolls up all time-phased WBS elements down to the activity level. This IMS will include the dependencies that exist between tasks. This 1MS will be agreed to and finalized at the PMBR.

VIII. Present the Risk Management Plan

1.1.16

Deviation Request: During the course of contract performance, in response to a need to change IMS activities as baselined at the PMBR, the Contractor will submit a Deviation Report. This report will be used to request a change in the agreed-upon IMS and timelines, if necessary. This report will include: (i) discussion of the justification/rationale for the proposed change; (ii) options for addressing the needed changes from the agreed upon timelines, including a cost-benefit analysis of each option; and (iii) recommendations for the preferred option that includes a full analysis and discussion of the effect of the change on the entire product development program, timelines, and budget.

1.1.17

Monthly and Annual Reports: The Contractor will deliver Project Status Reports on a monthly basis. The reports will address the items below cross referenced to the WBS, SOW, IMS, and EVMS:

I. Executive summary highlighting the progress, issues, and relevant activities in manufacturing, non-clinical, clinical, and regulatory;

II. Progress in meeting contract milestones, detailing the planned progress and actual progress during the reporting period, explaining any differences between the two and corrective steps;

III. Updated IMS;

IV. Updated EVMS;

V. Updated Risk Management Plan (Every 3 months);

VI. Three month rolling forecast of planned activities;

VII. Progress of regulatory submissions;

VIII. Estimated and actual expenses;

1.1.18

Data Management: The Contractor will develop and implement data management and quality control systems/procedures, including transmission, storage, confidentiality, and retrieval of all contract data;

Page 5 of 23


 

1.1.18.1

Provide for the statistical design and analysis of data resulting from the research;

1.1.18.2

Provide raw data or specific analyses of data generated with contract funding to the Project Officer, upon request.

1.2

Non-Clinical Development (WBS 1.2)

1.2.1

PK/PD (WBS 1.2.1 - reserved)

1.2.2

Safety (WBS 1.2.2)

1.2.2.1

Segment 3 toxicology (WBS 1.2.2.1): A Segment 3 toxicology study will be conducted to evaluate effects of SOLI on gestation, parturition, and lactation.

1.2.2.2

Juvenile toxicology (WBS 1.2.2.2): This study is designed to characterize postnatal developmental toxicities that would not be detected in routine perinatal/postnatal toxicity study designs. NOTE: Segment II toxicology generally provides sufficient data to proceed with pediatric studies for antibiotics in the macrolide class. Therefore, although the Contractor has budgeted for juvenile toxicology in the Cost Proposal, the Contractor does not propose to do this study unless specifically requested by the FDA.

1.3

Non-Clinical Biodefense (WBS 1.3)

1.3.1

Agent Characterization (WBS 1.3.1 - reserved)

1.3.2

Model Development (WBS 1.3.2)

1.3.2.1

Determination of Protein Binding in Monkey Plasma (WBS 1.3.2.1): When modeling IV doses in monkeys that equate to the human therapeutic oral dose (for CABP), the degree of protein binding of SOLI in monkey plasma must be taken into consideration.

1.3.2.2

Reverse PK/PD Modeling for Non-Human Primate (NHP) Dose (WBS 1.3.2.1): IV dosing of monkeys is necessary to overcome the first pass metabolism that SOLI undergoes after oral administration in monkeys, which is unlike that seen in human oral studies. The pharmacokinetic (PK) data from a previously completed 28-day IV toxicology/toxicokinetic study in non-infected cynomolgus monkeys administered various SOLI dosing regimens will be used to develop a structural population PK model describing the disposition of SOLI. Using this population PK model, SOLI dosing regimens will be identified which provide concentration-time profiles similar to those for dosing regimens being developed for treatment of patients with community-acquired bacterial pneumonia (CABP).

1.3.2.3

Pilot NHP efficacy study in cynomolgus macaques for treatment of inhalational anthrax (WBS 1.3.2.2): In this non-GLP study, an established monkey model will be used to determine the effective dose & duration of SOLI necessary for treatment of inhalational anthrax.



Page 6 of 23


 

1.3.2.4

Pilot NHP efficacy study in cynomolgus macaques for treatment of pneumonic tularemia (WBS 1.3.2.3): In this non-GLP study, an established monkey model will be used to determine the effective dose & duration of SOLI necessary for treatment of inhalational tularemia.

1.3.2.5

PK/PD Confirmation Modeling and Determination of Dose for Pivotal Efficacy Studies (WBS 1.3.2.1): Using the data from the pilot treatment efficacy studies in NHPs, population PK and PK/PD analyses will be conducted. The population PK model based on data from non-infected cynomolgus monkeys will be refined as necessary to describe the data from cynomolgus monkeys infected with biothreat agents including B. anthracis or F. tularensis. This refined population PK model will be used to predict exposures for the humanized SOLI dosing regimens studied. PK-PD analyses for efficacy will then be conducted and PK-PD relationships based on these analyses will be used to guide selection of SOLI dosing regimens for further evaluation in pivotal studies.

1.3.3

Efficacy and Safety (WBS 1.3.3)

1.3.3.1

Pivotal NHP efficacy study in cynomolgus macaques for treatment of inhalational anthax (WBS 1.3.3.1): A protocol/synopsis will be drafted for a pivotal anthrax efficacy study in NHPs. Study design will be based on Animal Rule guidance and treatment efficacy data from the pilot anthrax study in NHPs.

1.3.3.2

Pivotal NHP efficacy study in cynomolgus macaques for treatment of pneumonic tularemia (WBS 1.3.3.2): A protocol/synopsis will be drafted for a pivotal tularemia efficacy study in NHPs. Study design will be based on Animal Rule guidance and treatment efficacy data from the pilot tularemia study in NHPs.

1.4

Clinical Studies (WBS 1.4)

1.4.1

Phase 1 (WBS 1.4.1)

1.4.1.1

Pediatric Dose Determination (WBS 1.4.1.1 and WBS 1.4.1.2): Compartmental PK/PD modeling and simulation of doses that takes into account body weight, height and the volume of distribution differences in pediatrics will be conducted. In addition, pediatric dose-determination studies will be performed to determine dose adjustments from the adult dose that are related to differences in CYP-based metabolism and drug elimination pathways in young children. Population variability in the pediatric age groups as well as the potential for drug-drug interactions will be taken into consideration.

1.4.1.2

Phase la Adolescents PK and Safety Study (WBS 1.4.1.1): The doses determined by the modeling experiments will be tested to determine safety and PK of SOLI in adolescents. Since Phase 1 studies in pediatrics are performed as an add-on to standard therapy in patients, a multiple day dosing strategy is proposed as it can be beneficial to current therapy, while a single dose will have limited added benefit. The Phase la safety and PK study will be performed with oral capsules in an open-label study in adolescents (12-17 years) receiving concomitant antibiotic treatment. Each

Page 7 of 23


 

cohort will contain 8-16 subjects. SOLI bioanalytical method development and validation in small volumes of human plasma and using dried blood spots (DBS) will be performed to support analysis of SOLI plasma levels in pediatric populations. Validation of DBS analysis will be performed if feasible and only if sufficient volume is available in blood draws.

1.4.1.3

Phase 1 Suspension Bioavailability Study (WBS 1.4.1.3): The relative bioavailability of the SOLI suspension formulation (relative to capsules) will be determined in healthy adult volunteers in an open-label, randomized, cross-over study.

1.4.1.4

Phase lb Pediatric PK and Safety Study site startup activities, including protocol development, site selection and startup activities, and shipment of drug and PK kits (WBS 1.4.1.2): The Phase lb safety and PK study will be designed for administration of oral capsules, suspension, and IV solution in children <12 years, and administration of IV solution-only in adolescents (12-17 years) receiving concomitant antibiotic treatment.

1.4.2

Phase 2/3 (WBS 1.4.2 - reserved)

Page 8 of 23


 

1.5Regulatory (WBS 1.5)

1.5.1

IND (WBS 1.5.1)

1.5.1.1

Pediatric Study Plan: The Contractor will submit a pediatric plan to the FDA within 60 days after the EOP2 meeting for the adult CABP and gonorrhea (GC) indications. The Contractor will submit an Agreed Initial PSP within 90 days of a meeting with FDA or receipt of written comments from FDA on the PSP.

1.5.1.2

Meeting with FDA regarding Pediatric Development: When the Contractor submits the Pediatric Study Plan to FDA, a request will be made to hold a meeting with FDA to discuss the proposed pediatric studies.

1.5.1.3

The Contractor will submit the Phase la protocol (Adolescent PK study) to FDA for review and comment.

1.5.1.4

The Contractor will submit a new IND for SOLI Powder for Oral Suspension (POS) including full CMC information on the suspension formulation, an updated Investigator Brochure and the final protocol for the Phase 1 suspension bioavailability study. The new IND will cross-reference data in the oral capsule and IV INDs. The Contractor will provide BARDA with all data submitted with the new IND.

1.5.2

NDA Activities (WBS 1.5.2)

1.5.2.1

The Contractor will submit a CMC Amendment for newly manufactured capsules (to be used in the Phase la/lb Pediatric PK and Safety Studies).

1.5.2.2

The Contractor will submit a CMC Amendment for the new IV formulation containing tri-amino acid buffer (to be used in the Nonclinical Biodefense animal studies and Phase lb Pediatric PK and Safety Studies).

1.5.2.3

After completion of each study, the Contractor will update relevant IND modules/summaries and submit all data and reports to the IND.

1.5.2.4

After completion of the NHP pilot studies and data analysis, the Contractor will submit a meeting request to FDA to discuss study design for pivotal NHP treatment efficacy studies and the path forward for the Animal Rule indication. A briefing document containing study designs and issues for discussion will be submitted to the FDA at least 30 days before the meeting.

1.5.2.5

The Contractor will submit the pivotal NHP treatment efficacy protocols along with dose justification to the FDA.

1.5.2.6

The Contractor will submit the Phase la Adolescent PK Study protocol to the SOLI capsule IND prior to enrollment of the first patient.

1.5.2.7

The Contractor will submit a Phase lb Pediatric Study protocol including PK/PD modeling of IV and capsules to FDA for review. Prior to enrollment of the first patient, the Contractor will submit the Phase lb protocol to the IND. If necessary, after determination of the relative bioavailability of the suspension formulation,



Page 9 of 23


 

and prior to enrollment of suspension cohorts, the Contractor will submit a Phase lb Study protocol amendment.

1.6CMC (WBS 1.6)

1.6.1

Chemistry (Formulation Studies) (WBS 1.6.1)

1.6.1.1

Obtain API: Drug substance will be sourced from the Contractor’s current API supplier.

1.6.1.2

Preformulation Studies: Preformulation studies will include pH solubility profiling, pH stability profiling, taste threshold evaluation and stress testing of SOLI. Part of the formulation development will be a study to assess excipients compatibility with SOLI. Commonly used pharmaceutical excipients suitable for a POS dosage formulation of SOLI, such as diluents, sugars, sugar alcohols, hydroxypropyl cellulose, viscosity improvers (xanthan gum, etc.) and preservatives (potassium sorbate, etc.) will be evaluated for compatibility with SOLI. Mixtures of SOLI and the excipients will be prepared and exposed to several stress conditions and placed on short term stability. Samples will be pulled after storage and stability will be assessed. To support the taste masking efforts the solubility of SOLI in the preferred suspending vehicles including water will be evaluated. SOLI In this study the water can be buffered to a pH in the range of 6 - 8, because SOLI solubility is low in this pH range.

1.6.1.3

Formulation development and stability studies: The target POS will be formulated to consist of approximately 10-20% SOLI as powder and to deliver approximately 30-70 mg/mL of SOLI as suspension upon reconstitution. Considerations for development of the POS formulation are: taste of suspension, suspendability, uniformity of dosage form (POS blend uniformity / sample from reconstituted suspension), powder flow, particle size, bulk density and moisture content. During trial formulations, the main considerations are: taste of suspension, suspendability, uniformity of dosage form and moisture content. Stability studies on prototype POS formulations in bottle packaging will be conducted. Stability studies on prototype reconstituted suspension will also be conducted. The need for an antioxidant in the formulation will be evaluated as part of the development.

1.6.1.4

Taste-masking formulation development: For initial approach, organoleptic method will be tried, which includes non-reducing sugars, sugar alcohols, other sweetener and other excipients to mask the bitter taste of the API. Initial taste masking development work may include a wet granulation technique using non-reducing sugars (e.g. powdered sucrose) and/or sugar alcohols as diluents and binders (e.g. hydroxypropyl cellulose). This approach will also establish a suspendability upon reconstitution, content uniformity, and flowability of the powder. If it is difficult to improve taste by organoleptic method, a POS formulation would be developed by physical taste masking method or combination of organoleptic method and physical method. Taste-masking sensory panels will evaluate the taste of the reconstituted suspension from the POS, and provide



Page 10 of 23


 

feedback to the formulation team. Studies will also include the selection of the appropriate container size for the POS and evaluation of the ability of the dose measurement device (syringe or dose cup to deliver the required dose). Compatibility of the container closure with the POS and compatibility of the dosing device (syringe or Dosing cup) with the reconstituted POS will also be evaluated.

1.6.2

Pre-Clinical Manufacturing (WBS 1.6.2)

1.6.2.1

POS Feasibility Lots: The formulation and process variables that are critical to meet the target product profile will be reconfirmed and used to guide the manufacture of clinical trial material (CTM) for Phase 1. A stability study will be conducted on the drug product from the feasibility lot.

1.6.3

Pilot Scale Manufacturing (WBS 1.6.3)

1.6.3.1

Contractor will manufacture, package, label and release Capsule and IV drug product for shipment to Phase 1 clinical sites. Executed batch records will be sent to BARDA.

1.6.3.2

Contractor will manufacture, package, label and release applicable IV drug product supplies for the NHP pilot studies.

1.6.3.3

Phase 1 clinical trial material (CTM) lots of POS: Current plans are to manufacture CTM for Phase I studies. Excipients complying with the standard of USP/NF/EP and excipients that have already been used in commercially available drug products in US/EU will be used. A stability study will be performed at Toyama Chemical according to the ICH guidelines. Clinical (primary) packaging is planned. The POS for clinical studies will be packaged in wide-mouthed HDPE bottles with each bottle containing a 5 day course of therapy for Phase lb. The higher strength formulation will be packaged and shipped first to support the Bioavailability study. The bottles will be labeled based on English text provided by Cempra. Supplies should be shipped in time to start clinical trials in the US. A full Certificate of Analysis for the CTM batch will be provided.

1.6.4

Commercial (WBS 1.6.4 - reserved)

1.6.5

Controls/Analytical Validation (WBS 1.6.5)

1.6.5.1

Analytical methods will be set with the same conditions and concentration of sample/standard solution as those of the current SOLI 200 mg capsule drug product. Appropriate diluents will be selected to extract SOLI from the powder for oral suspension drug product. For method validation, Specificity, Linearity, Detection Limit, Quantitation Limit, Accuracy and Repeatability will be performed before the pediatric pharmacokinetic (PK) studies (early clinical stage) and Intermediate Precision and Robustness will be performed before completion of registration batches. The analytical methods required include:


Page 11 of 23


 

·

Appearance and Identification by HPLC

·

Product Assay and Related Substances Assay

·

Dissolution

·

Moisture Content

·

Microbial Limit Testing (MLT)

·

Preservative Assay (as appropriate)

·

Anti-oxidant Assay (as appropriate)

Page 12 of 23


 

2. CLIN 2

2.1

Program Management (WBS 2.1)

The Contractor outsources a majority of the work to established practitioners in each discipline, with the Contractor team providing experienced program management, coordination, and oversight. All selected purchased commercial service providers for the BARDA project have proven their ability to deliver quality work cost-effectively and on schedule. The Contractor shall provide for the following program management activities as outlined below:

2.1.1

The Contractor will provide overall management, integration and coordination of all contract activities, including a technical and administrative infrastructure to ensure the efficient planning, initiation, implementation, and direction of all contract activities.

2.1.2

The Principal Investigator is responsible for overall leadership for project management, communication, tracking, monitoring and reporting on status and progress, and modification to the project requirements and timelines, including projects undertaken by subcontractors.

2.1.3

The Project Manager will oversee the monitoring and tracking day-to-day progress and timelines, coordinating communication and project activities: costs incurred; and program management.

2.1.4

The Principal Investigator and the Project Manager will act as the BARDA Liaison with responsibility for effective communication with the Project Officer and Contracting Officer.

2.1.5

The Contractor has adequate administrative staff and legal consultants to provide development of compliant subcontracts, consulting, and other legal agreements, and ensure timely acquisition of all proprietary rights, including IP rights, and reporting all inventions made in the performance of the project.

2.1.6

The Contractor’s Project Management Team along with support from the Finance department has responsibility for financial management and reporting on all activities conducted by the Contractor and any subcontractors and service providers.

2.1.7

Contract Review Meetings

2.1.7.1

The Contractor’s team will participate in regular face-to-face meetings on a quarterly basis to coordinate and oversee the contract effort as directed by the Contracting and Project Officers. Such meetings may include, but are not limited to, meeting of the Contractor and subcontractors to discuss clinical manufacturing progress, product development, product assay development, scale up manufacturing development, clinical sample assays development, preclinical/clinical study designs and regulatory issues; meetings with individual Contractors and other HHS officials to discuss the technical regulatory, and



Page 13 of 23


 

ethical aspects of the program:, and meeting with technical consultants to discuss technical data provided by the Contractor.

2.1.7.2

The Contractor will participate in teleconferences every 2 weeks between the Contractor and BARDA to review technical progress. The Contractor will include subcontractors and service providers as necessary. If additional teleconferences or face-to-face meetings are requested by BARDA, the Contractor will be available.

2.1.8

Integrated Master Schedule (IMS)

2.1.8.1

Within 30 calendar days of the effective date of the contract, the Contractor will submit a first draft of an updated IMS to the Project Officer and the Contracting Officer for review and comment. The Integrated Master Schedule will be used to monitor performance of the contract. The Contractor will include key milestones and Go/No Go decision gates. The IMS for the period of performance will be reviewed and accepted by BARDA at the PMBR.

2.1.8.2

Changes to the IMS: During the course of contract performance, in response to a need to change IMS activities as baselined at the PMBR, the Contractor will submit a Baseline Change Request. This report will be used to request a change in the agreed-upon IMS and timelines, if necessary.

2.1.9

Work Breakdown Structure: The Contractor will utilize a WBS template agreed upon by BARDA for reporting on the contact. The Contractor will expand and delineate the Contract Work Breakdown Structure (CWBS) to a level agreed upon by BARDA.

2.1.10

GO/ NO-GO Decision Gates/Contract Milestones: The Go/No Go Milestones will outline key objectives with “Go/No Go” decision criteria (entrance and exit criteria for each phase of the project). The milestones should include, but not be limited to, objectives in manufacturing, non-clinical and clinical studies, and regulatory submissions.

2.1.11

Earned Value Management System: Subject to the requirements under HHSAR Clause 352.234-4, the Contractor will use principles of Earned Value Management System (EVMS) in the management of this contract. The Contractor will follow the Seven Principles:

VIII. The Contractor will plan all work scope for the program to completion.

IX. The Contractor will break down the program work scope into finite pieces that can be assigned to a responsible person or organization for control of technical, schedule, and cost objectives.

X. The Contractor will integrate program work scope, schedule, and cost objectives into a performance measurement baseline plan against which accomplishments may be measured.

XI. The Contractor will use actual cost incurred and recorded in accomplishing the work performed.


Page 14 of 23


 

XII. The Contractor will objectively assess accomplishments at the work performance level.

XIII. The Contractor will analyze significant variances from the plan, forecast impacts, and prepare an estimate at completion based on performance to date and work to be performed.

XIV. The Contractor will use earned value information in the company’s management processes as it relates to the BARDA contract.

2.1.12

Risk Management Plan: The Contractor will develop a risk management plan within 90 days of contract award highlighting potential problems and/or issues that may arise during the life of the contract, their impact on cost, schedule and performance, and appropriate remediation plans. This plan will reference relevant WBS elements where appropriate. Updates to this plan will be made as deemed necessary.

2.1.13

Performance Measurement Baseline Review (PMBR): The Contractor will submit a plan for a PMBR to occur within 90 days of contract award. At the PMBR, the Contractor and BARDA will mutually agree upon the budget, schedule and technical plan baselines (Performance Measurement Baseline). These baselines will be the basis for monitoring and reporting progress throughout the life of the contract. The PMBR is conducted to achieve confidence that the baselines accurately capture the entire technical scope of work, are consistent with contract schedule requirements, are reasonably and logically planned, and have adequate resources assigned. The goals of the PMBR are as follows:

IX. Jointly assess areas such as the Contractor’s planning for complete coverage of the SOW, logical scheduling of the work activities, adequate resources, and identification of inherent risks

X. Confirm the integrity of the Performance Measurement Baseline (PMB)

XI. Foster the use of EVM as a means of communication

XII. Provide confidence in the validity of the Contractor’s reporting

XIII. Identify risks associated with the PMB

XIV. Present any revised PMBs for mutual agreement

XV. Present an IMS: The Contractor will deliver an initial program IMS that rolls up all time-phased WBS elements down to the activity level. This IMS will include the dependencies that exist between tasks. This IMS will be agreed to and finalized at the PMBR.

XVI. Present the Risk Management Plan

2.1.14

Monthly and Annual Reports: The Contractor will deliver Project Status Reports on a monthly basis. The reports will address the items below cross referenced to the WBS, SOW, IMS, and EVMS:

IX. Executive summary highlighting the progress, issues, and relevant activities in manufacturing, non-clinical, clinical, and regulatory

X. Progress in meeting contract milestones, detailing the planned progress and actual progress during the reporting period, explaining any differences between the two and corrective steps

Page 15 of 23


 

XI. Updated 1MS

XII. Updated EVMS

XIII. Two month rolling forecast of planned activities

XIV. Progress of regulatory submissions

XV. Estimated and actual expenses

2.2Non-Clinical Development (WBS 2.2 — reserved)

2.3Non-Clinical Biodefense (WBS 2.3 — reserved)

2.4Clinical (WBS 2.4)

2.4.1

Phase 1 (WBS 2.4.1)

2.4.1.1

Phase lb Pediatric PK Study (WBS 2.4.1.1): The Contractor will conduct a multiple dose PK and safety study in pediatrics. This open-label study will be performed with oral capsules, suspension, or IV solution in children less than 12 years, and with IV solution-only in adolescents (12-17 years).  Each cohort can contain up to 16 subjects. PK and safety data may be published in a peer-reviewed scientific journal. Changes to the clinical design may occur based on the Cempra’s assessment with input from BARDA.

2.4.1.2

PK/PD-modeling for pediatric therapeutic dose justification for Phase 2/3 trial (WBS 2.4.1.2): Using PK data from Phase la/b studies, the population PK will be modeled. Pediatric therapeutic doses will be selected based upon the target attainment PK/PD modeling based on plasma and pulmonary levels in adult subjects.

2.4.2

Phase 2/3 (WBS 2.4.2)

2.4.2.1

Phase 2/3 pediatric CABP study Startup activities (WBS 2.4.2.1): The Phase 2/3 safety study will be designed for administration of oral capsules, suspension, and IV solution in pediatric CABP patients receiving concomitant antibiotic treatment. The Phase 2/3 study startup activities will include but are not limited to: development of a protocol and SAP, site feasibility/selection and activation activities, development of an Informed Consent Form, Clinical Monitoring Plan, Regulatory Binder, Safety Reporting Plan, Data Management Plan and other study documentation (to include any foreign regulatory submission documents), establishing a DSMC and charter, and shipment of CTM and PK kits. Changes to the clinical design may occur based on Cempra’s assessment with input from BARDA.


Page 16 of 23


 

2.5Regulatory (WBS 2.5)

2.5.1

IND (WBS 2.5.1 — reserved)

2.5.2

NDA (WBS 2.5.2)

2.5.2.1

The Contractor will submit IND Amendments for CTM batches (WBS 2.5.2.1)

2.5.2.2

The contractor will submit IMPDs for Pediatric studies (multiple countries)

2.5.2.3

The contractor will submit taste optimization/ DOE work to FDA for POS formulation

2.5.2.4

The Contractor will submit the Pediatric Phase 2/3 protocol and Clinical Study Regulatory Documents to FDA (WBS 2.5.2.2)

2.5.2.5

The Contractor will submit an NDA for IV and oral capsules in adults for CABP and GC indications, including adolescent GC patients. PDUFA fees for these NDAs will be covered by the Contractor (WBS 2.5.2.3).

2.5.2.6

The Contractor will submit the Phase lb CSR to the FDA (WBS 2.5.2.4).

2.5.2.7

The Contractor will submit other BARDA related Regulatory/Ethics Committee amendments and summaries as deemed necessary by Cempra’s Regulatory team.

2.6CMC (WBS 2.6)

2.6.1

Chemistry (Formulation Studies) (WBS 2.6.1)

2.6.1.1

Obtain API: Drug substance will be sourced from the Contractor’s current API supplier.


Page 17 of 23


 

2.6.1.2

Formulation studies will be conducted at a CMO. These include but are not limited to:

2.6.1.2.1

Excipient compatibility: Several studies will be performed to evaluate the effect of different excipients on the formulation. The excipients include but are not limited to: sucralose, magna-sweet, sodium chloride, flavor, colorant and citric acid.

2.6.1.2.2

Formulation optimization: Several studies to optimize the formulation composition identified from taste evaluation work will be conducted at Catalent. A Design of Experiments (DoE), or similar approach, will be used. Studies will include, but are not limited to:

·

Determination of buffer capacity

·

Determine the amount of anti-forming agent required

·

The amount of shaking to re-suspend the powder

·

The level of preservative in the formulation

·

The addition of a colorant to improve aesthetic appeal

·

The amount of water required for reconstitution to a target concentration

·

A method for reconstitution

2.6.2

Pre-Clinical Manufacturing (WBS 2.6.2)

2.6.2.1

POS Process Optimization: After the formulation optimization DoE work is completed, manufacturing process development and optimization to support the manufacture of clinical supplies for the Phase 2/3 studies will be conducted. The key requirements of the process include, but are not limited to, these items listed below:

·

The process should consistently yield a homogeneous blend

·

The POS blend should flow sufficiently well for machine processing

·

The process should be scalable

·

The process should be efficient with just enough steps to yield a consistent product

The formulation and process variables that are critical to meet the target product profile will be determined and used to guide the manufacture of clinical trial material (CTM) for Phase 1. A stability study will be conducted on the POS manufactured at target parameters.


Page 18 of 23


 

2.6.2.2

Process confirmation: At least one process confirmation batch will be manufactured at the 20-50 kg scale. The batch(es) will be packaged and set on stability. The results from the process confirmation batch(es) will guide manufacture of a clinical batch for the phase 2/3 studies.

2.6.3

Pilot Scale Manufacturing (WBS 2.6.3)

2.6.3.1

Capsules and IV vials will be acquired and packaged for the pediatric Phase 2/3 study (WBS 2.6.3.2).

2.6.3.2

Phase 2/3 POS CTM (WBS 2.6.3.4): Manufacturing, packaging, quality studies, and stability study will be conducted at a CMO. Phase 2/3 CTM will be manufactured at an appropriate scale and, if possible, will suffice as 1 of the 3 registration batches needed for NDA submission. (Registration batch manufacturing, packaging and testing originally planned for CLIN 2 will now be conducted in a future CLIN). SOLI will be compared to the Standard of Care (SOC) treatment. If necessary, Cempra will have to procure SOC comparator products as well.

2.6.4

Commercial (WBS 2.6.4 - reserved)

2.6.5

Controls/Analytical Validation (WBS 2.6.5).

2.6.5.1

POS Phase 1 CTM Stability Study (WBS 2.6.5.1)

2.6.5.2

Analytical methods to support formulation and process optimization will be adapted from those used in the manufacture of phase 1 clinical supplies. These methods will be further developed and validated to support the phase 2/3 study. The analytical methods required include, but are not limited to:

 

·

Appearance and Identification by HPLC

·

Product Assay and Related Substances Assay

·

Dissolution

·

Moisture Content

·

Microbial Limit Testing (MLT)

·

Preservative Assay (as appropriate)

·

Microbial Effectiveness Test (AET) methods


Page 19 of 23


 

3. CLIN 3

3.1Program Management (WBS 3.1)

3.1.1

Program management scope is consistent with that outlined in CLIN 2.

3.2

Non-Clinical Development (WBS 3.2 - reserved)

3.3

Non-Clinical Biodefense (WBS 3.3)

3.3.1

Agent Characterization (WBS 3.3.1 — reserved)

3.3.2

Model Development (WBS 3.3.2 — reserved)

3.3.3

Efficacy and Safety (WBS 3.3.3)

3.3.3.1

Pivotal NHP Efficacy Study in cynomolgus macaques for treatment of inhalational anthrax (WBS 3.3.3.1): The therapeutic dose selected based on the pilot NHP study and PK/PD modeling will be tested in the pivotal GLP study to determine the efficacy of SOLI in the therapeutic model of inhalational anthrax in cynomolgus monkeys.

3.3.3.2

Pivotal NHP Efficacy Study in cynomolgus macaques for treatment of inhalational tularemia (WBS 3.3.3.2): The dose selected based on the pilot NHP study and PK/PD modeling will be tested in a pivotal GLP study to determine the efficacy of SOLI in the therapeutic model of inhalational tularemia in cynomolgus monkeys.

3.3.3.3

PK/PD Modeling and Translation to Human Dose for Treatment of Inhalational Anthrax and Tularemia (WBS 3.3.3.3): The plasma concentration-time data from the infected cynomolgus monkeys will be evaluated using a similar structural population PK model as that previously developed for the non-infected animals, and individual SOLI exposure measures (AUC) will be generated for each animal. These individual exposure measures will then be utilized in subsequent PK/PD analyses for both animal survival and SOLI microbiologic response. The relationship between the AUC:MIC ratio and the efficacy endpoints, animal survival, and the microbiological response to therapy measured at the end-of-therapy, will be examined. If trends for PK/PD relationships for efficacy are observed, initial graphical analyses of efficacy endpoints will be followed by univariable and multivariable logistic or other nonlinear regression modeling techniques. In addition, a survival analysis (i.e., time-to-event analysis) may be conducted if appropriate. These pharmacokinetic parameters will be used to calculate the therapeutic doses for inhalational anthrax and inhalational tularemia in human adults. Upon completion of pediatric PK studies, the therapeutic doses for children for biodefense indications will be extrapolated from the pediatric PK/PD results.


Page 20 of 23


 

3.4Clinical (WBS 3.4)

3.4.1

Phase 1 (WBS 3.4.1)

3.4.1.1

Phase 1 Multiple dose PK and Safety study in Human (Adult) Volunteers (WBS 3.4.1.1): The multidose study is planned for 21 days, but could be shortened if efficacy is demonstrated with a shorter duration of SOLI treatment in the NHP studies.

3.4.2

Phase 2/3 (WBS 3.4.2 - reserved)

3.5Regulatory (WBS 3.5)

3.5.1

IND (WBS 3.5.1 — reserved)

3.5.2

NDA (WBS 3.5.2)

3.5.2.1

After completion of the NHP pilot studies, the Contractor will submit a meeting request to FDA to discuss submission of the supplemental NDA for the Animal Rule indications (WBS 3.5.2.1).

3.5.2.2

The Contractor will submit supplemental NDAs for use of SOLI capsule and IV formulations for the biodefense indications under the Animal Rule (WBS 3.5.2.2).

3.6CMC (WBS 3.6)

3.6.1

Chemistry (Formulation Studies) (WBS 3.6.1 - reserved)

3.6.1.1

Obtain API: Drug substance will be sourced from the Cempra’s current API supplier. Registration grade API is required for POS registration batches.

3.6.2

Pre-Clinical Manufacturing (WBS 3.6.2 - reserved)

3.6.3

Pilot Scale Manufacturing (WBS 3.6.3)

3.6.3.1

POS registration batches will be manufactured.

3.6.3.2

IV drug product supplies will be packaged for NHP pivotal studies (WBS 3.6.3.1)

3.6.4

Commercial (WBS 3.6.4 - reserved)

3.6.5

Controls/Analytical Validation (WBS 3.6.5)

3.6.5.1

POS Phase 2/3 CTM Stability Study (WBS 3.6.5.1)


Page 21 of 23


 

4. CLIN 4 (GOVERNMENT/CONTRACTOR COST-SHARE)

4.1Program Management (WBS 4.1)

4.1.1

Program management scope is consistent with that in CLIN 3.

4.2Non-Clinical Development (WBS 4.2 - reserved)

4.3Non-Clinical Biodefense (WBS 4.3 - reserved)

4.4Clinical Studies (WBS 4.4)

4.4.1

Phase 1 (WBS 4.4.1 - reserved)

4.4.2

Phase 2/3 (WBS 4.4.2)

4.4.2.1

Phase 2/3 Pediatric CABP Trial (WBS 4.4.2.1): Since CABP infection in children is similar to that documented in adults, results of microbiological efficacy in adults could be extrapolated to children with similar antimicrobial exposure. Therefore, a Phase 2/3 study is proposed following completion of the Phase 1 studies. These studies will be conducted after successful completion of adult CABP trials and submission of the NDA for adult CABP. Sparse PK sampling will be conducted and used in Pop PK modeling. These outline of this study has been approved in the PSP and the PIP.

4.5Regulatory (WBS 4.5 - reserved)

4.6CMC (WBS 4.6 - reserved)


Page 22 of 23


 

5. CLIN 5

5.1Program Management (WBS 5.1)

5.1.1

Program management scope is consistent with that in CLIN 4.

5.2Non-Clinical Development (WBS 5.2 - reserved)

5.3Non-Clinical Biodefense (WBS 5.3 - reserved)

5.4Clinical (WBS 5.4 - reserved)

5.5Regulatory (WBS 5.5)

5.5.1

IND (WBS 5.5.1 - reserved)

5.5.2

NDA (WBS 5.5.2)

5.5.2.1

At the completion of the Phase 2/3 pediatric CABP trial, the Contractor will submit an NDA for oral suspension for CABP in adults and pediatric populations to the FDA, including a biodefense indication under the Animal Rule (WBS 5.5.2.1).

5.5.2.2

The Contractor will submit supplemental NDAs for use of SOLI capsule and IV formulations for the CABP and biodefense indications in pediatric patients (WBS 5.5.2.2).

5.6CMC (WBS 5.6 - reserved)

6. OTHER ITEMS

6.1Facilities, Equipment, and Other Resources

The Contractor confirms the subcontractor and all purchased commercial service providers provide equipment, facilities and other resources under Federal and HHS regulations.